REKAPITULASI

PEKERJAAN : PEMBANGUNAN / PENINGKATAN GEDUNG LABKESDA


LOKASI : DINAS KESEHATAN KABUPATEN PANDEGLANG
THN ANGGARAN : 2022

Jumlah Harga
No Uraian Pekerjaan
(Rp)

I. PEKERJAAN KONSTRUKSI

A. PEKERJAAN PERSIAPAN 28,374,633.33

B. PEKERJAAN LANTAI I
I. PEKERJAAN GALIAN TANAH DAN URUGAN 16,122,415.00
II. PEKERJAAN PONDASI DAN BETON 483,618,512.13
III. PEKERJAAN DINDING DAN PLESTERAN 428,997,122.00
IV. PEKERJAAN PINTU DAN JENDELA 195,637,573.90
V. PEKERJAAN PINTU LAPIS Pb 52,762,500.00
VI. PEKERJAAN PLAFOND 46,099,200.00
VII. PEKERJAAN TIMBAL 152,704,437.50
VIII. PEKERJAAN PELAPIS LANTAI DAN DINDING 106,380,130.00
IX. PEKERJAAN ELEKTRIK 51,667,140.00
X. PEKERJAAN PENGECATAN 85,105,048.00
XI. PEKERJAAN SANITAIR 41,218,400.00

C. PEKERJAAN LANTAI II
I. PEKERJAAN PONDASI DAN BETON 79,036,228.12
II. PEKERJAAN DINDING DAN PLESTERAN 73,136,198.00
III. PEKERJAAN PINTU DAN JENDELA 51,612,128.08
IV. PEKERJAAN ATAP 69,167,644.00
V. PEKERJAAN PLAFOND 32,566,400.00
VI. PEKERJAAN PELAPIS LANTAI DAN DINDING 38,079,530.00
VII. PEKERJAAN ELEKTRIKAL 9,197,750.00
VIII. PEKERJAAN PENGECATAN 15,596,856.00
IX. PEKERJAAN SANITAIR 19,867,100.00
X. PEKERJAAN LAIN-LAIN 16,567,053.91

D. PEKERJAAN PAGAR KELILING BANGUNAN TINGGI 1,6 M 118,616,868.64


E. PEKERJAAN POS JAGA (4.5 X 2,5 M) 45,000,000.00

JU M LAH I 2,257,130,868.60

II. PELAKSANAAN K3 KONSTRUKSI JU M LAH II 15,597,000.00

JU M LAH 2,272,727,868.60
P P N 10 % 227,272,786.86
JU M LAH T O T AL 2,500,000,655.46
D IB U LAT K AN 2,500,000,000.00

TERBILANG : DUA MILYAR LIMA RATUS JUTA RUPIAH

Pandeglang, 10 Juni 2021

Kepala Dinas Kesehatan


Kabupaten Pandeglang

Hj. RADEN DEWI SETIANI, Amd. Keb, S.Sos, MA


Pembina TK. I – IV/b
NIP. 19680917 199103 2 004
RENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN : PEMBANGUNANN/PENINGKATAN GEDUNG LABKESDA
LOKASI : DINAS KESEHATAN KABUPATEN PANDEGLANG
THN ANGGARAN : 2022

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN HARGA
(Rp) (Rp)

I. PEKERJAAN KONSTRUKSI

A. PEKERJAAN PERSIAPAN
1 Pasang papan nama proyek 1.00 bh 350,000.00 350,000.00
2 Pek. Bongkaran 1.00 ls 10,000,000.00 10,000,000.00
3 Pek. Pengukuran kembali dan pas. bouwplank 55 2/3 m1 69,800.00 3,885,533.33
4 Pembuatan los kerja/gudang semen dan peralatan (3 X 3 M) 9.00 m2 959,900.00 8,639,100.00
5 Pengadaan air dan listrik kerja 1.00 ls 1,000,000.00 1,000,000.00
6 Biaya pelaporan dan dokumentasi 1.00 ls 3,000,000.00 3,000,000.00
7 Biaya As built drawing 1.00 ls 1,500,000.00 1,500,000.00
JU M LAH I 28,374,633.33

B. PEKERJAAN LANTAI I

I. PEKERJAAN GALIAN TANAH DAN URUGAN


1 Pek. Galian tanah pondasi setempat maksimal kedalaman 2 M 56.00 m3 86,600.00 4,849,600.00
2 Pek. Galian tanah pondasi lajur maksimal kedalaman 1 M 85.17 m3 70,100.00 5,970,417.00
3 Pek. Urugan tanah kembali 47.06 m3 52,200.00 2,456,358.00
4 Pek. Urugan pasir di bawah pondasi 12.82 m3 222,000.00 2,846,040.00
JU M LAH I 16,122,415.00
II. PEKERJAAN PONDASI DAN BETON
1 Pas. Pondasi batu kosong/Aanstamping 15.03 m3 470,100.00 7,065,603.00
2 Pas. Pondasi batu belah ad. 1pc : 5pp 37.58 m3 816,800.00 30,691,260.00
3 Pek. Lantai kerja beton tumbuk t = 5 cm ad. 1pc : 3pb : 5kr 6.41 m3 853,200.00 5,469,012.00
4 Pek. Pondasi beton setempat 100/100 mutu beton K-225 7.00 m3 4,393,530.00 30,754,710.00
5 Pek. Sloof beton 20/30 mutu beton K-225 11.69 m3 4,545,120.00 53,132,452.80
6 Pek. Kolom beton 30/30 mutu beton K-225 10.84 m3 4,932,140.00 53,464,397.60
7 Pek. Kolom beton 30/15 mutu beton K-225 0.54 m3 6,648,130.00 3,589,990.20
8 Pek. Kolom beton 20/20 mutu beton K-225 3.20 m3 5,427,810.00 17,368,992.00
9 Pek. Kolom beton 15/15 mutu beton K-225 2.07 m3 7,127,650.00 14,754,235.50
10 Pek. Balok beton 20/80 mutu beton K-225 3.63 m3 5,014,430.00 18,202,380.90
11 Pek. Balok beton 15/30 mutu beton K-225 8.40 m3 7,365,800.00 61,872,720.00
12 Pek. Balok beton lintel 10/12 mutu beton K-175 0.58 m3 9,706,990.00 5,591,226.24
13 Pek. Dak beton t = 12 cm mutu beton K-225 26.86 m3 5,357,716.67 143,908,269.67
14 Pek. Kanopi beton t = 8 cm mutu beton K-225 4.48 m3 6,458,920.00 28,935,961.60
15 Pek. Tangga beton t = 10 cm mutu beton K-175 1.35 m3 6,159,300.00 8,315,055.00
16 Pek. Meja beton t = 8 cm mutu beton K-175 0.08 m3 6,458,920.00 502,245.62
JU M LAH II 483,618,512.13
III. PEKERJAAN DINDING DAN PLESTERAN
1 Pas. Dinding bata merah 1 bata ad 1 : 5 784.10 m2 224,100.00 175,716,810.00
2 Pas. Dinding bata ringan/hebel (uk. 10x20x60 cm) 540.64 m2 142,100.00 76,824,944.00
3 Pas. Plesteran + acian ad. 1pc : 4pp 2,649.48 m2 66,600.00 176,455,368.00
JU M LAH III 428,997,122.00
IV. PEKERJAAN PINTU DAN JENDELA
1 Pas. Kusen pintu (type PJ1) 1.00 unit 27,492,753.28 27,492,753.28
2 Pas. Kusen pintu (type P1) 4.00 unit 8,224,035.95 32,896,143.80
3 Pas. Kusen pintu (type P2) 2.00 unit 4,727,695.05 9,455,390.10
4 Pas. Kusen pintu (type P3) 16.00 unit 2,961,043.80 47,376,700.80
5 Pas. Kusen pintu (type P4) 1.00 unit 4,307,694.30 4,307,694.30
6 Pas. Kusen pintu (type P5) 2.00 unit 2,588,442.68 5,176,885.35
7 Pas. Kusen pintu PVC (type P6) 4.00 unit 516,600.00 2,066,400.00
8 Pas. Kusen jendela (type JU) 4.00 unit 9,441,219.45 37,764,877.80
9 Pas. Kusen jendela (type J2) 9.00 unit 2,945,773.35 26,511,960.15
10 Pas. Bouvenlight (type BV1) 1.00 unit 1,876,437.23 1,876,437.23
11 Pas. Bouvenlight (type BV2) 2.00 unit 356,165.55 712,331.10
JU M LAH IV 195,637,573.90
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN HARGA
(Rp) (Rp)

V. PEKERJAAN PINTU LAPIS Pb


1 Pas. Pintu double swing lapis Pb 1.00 unit 37,575,000.00 37,575,000.00
2 Pas. Kaca lapis Pb uk 30 x 40 cm 1.00 unit 15,187,500.00 15,187,500.00
JU M LAH V 52,762,500.00
VI. PEKERJAAN PLAFOND
1 Pas. Rangka plafond besi hollow galvanish 288.62 m2 108,200.00 31,228,684.00
2 Pas. Plafond gypsum t = 9 mm 268.62 m2 51,800.00 13,914,516.00
3 Pas. Plafond GRC t = 9 mm 20.00 m2 47,800.00 956,000.00
JU M LAH VI 46,099,200.00
VII. PEKERJAAN TIMBAL
1 Pas. Lapisan Pb (timah hitam) pada dinding 59.60 m2 1,782,812.50 106,255,625.00
2 Pas. Lapisan Pb (timah hitam) pada plafond 17.64 m2 1,782,812.50 31,448,812.50
3 Pek. Uji proteksi radiasi 1.00 ls 15,000,000.00 15,000,000.00
JU M LAH VII 152,704,437.50
VIII. PEKERJAAN PELAPIS LANTAI DAN DINDING
1 Pas. Lantai granit 60/60 corak/warna 256.02 m2 227,700.00 58,295,754.00
2 Pas. Keramik lantai 40/40 corak/warna 84.04 m2 162,300.00 13,639,692.00
3 Pas. Keramik lantai 25/25 KM/WC unpolished 12.60 m2 160,000.00 2,016,000.00
4 Pas. Keramik dinding 25/40 KM/WC corak/warna 42.40 m2 185,800.00 7,877,920.00
5 Pas. Granit 60/60 meja beton corak/warna 1.08 m2 227,700.00 245,916.00
6 Pas. Keramik dinding 25/60 meja beton corak/warna 2.16 m2 185,800.00 401,328.00
7 Pas. Lapisan glasswool lapis gypsum finishing karpet di R. Genset 22.80 m2 318,300.00 7,257,240.00
8 Pas. Lapisan gypsum penutup dinding Pb finishing HPL glosy 59.60 m2 279,300.00 16,646,280.00
JU M LAH VIII 106,380,130.00
IX. PEKERJAAN ELEKTRIKAL
1 Pas. Instalasi titik lampu 38.00 ttk 180,500.00 6,859,000.00
2 Pas. Instalasi titik stop kontak 17.00 ttk 180,500.00 3,068,500.00
3 Pas. Stop kontak sek. Brocco 12.00 bh 13,120.00 157,440.00
4 Pas. Stop kontak AC sek. Brocco 5.00 bh 52,500.00 262,500.00
5 Pas. Saklar seri sek. Brocco 30.00 bh 16,270.00 488,100.00
6 Pas. Saklar tunggal sek. Brocco 3.00 bh 13,120.00 39,360.00
7 Pas. Lampu downlight 4" LED 14 watt sek. Philips 7.00 bh 126,100.00 882,700.00
8 Pas. Lampu downlight 4" LED 10 watt sek. Philips 9.00 bh 119,600.00 1,076,400.00
9 Pas. Lampu SL 18 watt sek. Philips 10.00 bh 40,420.00 404,200.00
10 Pas. Lampu SL 10 watt sek. Philips 12.00 bh 28,870.00 346,440.00
11 Pas. Exhaust fan 40 watt 4.00 unit 460,000.00 1,840,000.00
12 Pas. Box Panel uk 50 x 70 cm + grounding 1.00 unit 15,000,000.00 15,000,000.00
13 Pas. Kabel NYFGBY 4 x70 mm 45.00 m1 449,833.33 20,242,500.00
14 Pas. Warming light 1.00 bh 1,000,000.00 1,000,000.00
JU M LAH IX 51,667,140.00
X. PEKERJAAN PENGECATAN
1 Pengecatan dinding sekulitas catylac 2,649.48 m2 21,800.00 57,758,664.00
2 Pengecatan plafond sekualitas catylac 288.62 m2 19,600.00 5,656,952.00
3 Pengecatan waterproofing dak beton 332.66 m2 65,200.00 21,689,432.00
JU M LAH X 85,105,048.00
XI. PEKERJAAN SANITAIR
1 Pas. Kloset duduk + asessories 4.00 bh 3,132,500.00 12,530,000.00
2 Pas. Jet shower 4.00 bh 150,000.00 600,000.00
3 Pas. Wastafel + asessories Pas. 5.00 bh 1,300,800.00 6,504,000.00
4 Kran air stainlees standar Pas. 4.00 bh 66,100.00 264,400.00
5 Floordrain stainlees standar 4.00 bh 77,500.00 310,000.00
6 Pas. Pipa PVC type AW Ø 4" (air kotor) 25.00 m1 128,000.00 3,200,000.00
7 Pas. Pipa PVC type AW Ø 3" (air kotor) 25.00 m1 87,500.00 2,187,500.00
8 Pas. Pipa PVC type AW Ø 2" (air kotor) 50.00 m1 51,700.00 2,585,000.00
9 Pas. Pipa PVC type AW Ø 3/4" (air bersih) 50.00 m1 22,800.00 1,140,000.00
10 Pek. Bak kontrol uk. 0,5 x 0,5 x 0,5 + tutup 1.00 bh 500,000.00 500,000.00
11 Pek. Menara air besi siku 70.70.7 mm Kap. 2.000 ltr 1.00 bh 7,000,000.00 7,000,000.00
12 Pas. Tangki air kap. 2.000 ltr 1.00 bh 3,097,500.00 3,097,500.00
13 Pas. Pompa air pendorong 1.00 bh 800,000.00 800,000.00
14 Pek. Rumah pompa air 1.00 bh 500,000.00 500,000.00
JU M LAH X I 41,218,400.00
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN HARGA
(Rp) (Rp)

C. PEKERJAAN LANTAI II

I. PEKERJAAN PONDASI DAN BETON


1 Pek. Kolom beton 30/30 mutu beton K-225 4.32 m3 4,932,140.00 21,306,844.80
2 Pek. Kolom beton 30/15 mutu beton K-225 0.49 m3 6,648,130.00 3,230,991.18
3 Pek. Balok beton 15/15 mutu beton K-225 1.17 m3 7,127,650.00 8,339,350.50
4 Pek. Balok beton lintel 10/12 mutu beton K-175 0.36 m3 9,706,990.00 3,494,516.40
5 Pek. Lisplank beton 8/60 mutu beton K-175 6.45 m3 6,458,920.00 41,660,034.00
6 Pek. Meja beton t = 8 cm mutu beton K-175 0.16 m3 6,458,920.00 1,004,491.24
JU M LAH I 79,036,228.12
II. PEKERJAAN DINDING DAN PLESTERAN
1 Pas. Dinding bata ringan/hebel (uk. 10x20x60 cm) 265.66 m2 142,100.00 37,750,286.00
2 Pas. Plesteran + acian ad. 1pc : 4pp 531.32 m2 66,600.00 35,385,912.00
JU M LAH II 73,136,198.00
III. PEKERJAAN PINTU DAN JENDELA
1 Pas. Kusen pintu (type P1) 1.00 unit 8,224,035.95 8,224,035.95
2 Pas. Kusen pintu PVC (type P6) 2.00 unit 516,600.00 1,033,200.00
3 Pas. Kusen jendela (type J1) 1.00 unit 12,540,993.08 12,540,993.08
4 Pas. Kusen jendela (type J2) 10.00 unit 2,945,773.35 29,457,733.50
5 Pas. Bouvenlight (type BV2) 1.00 unit 356,165.55 356,165.55
JU M LAH III 51,612,128.08
IV. PEKERJAAN ATAP
1 Pas. Kuda-kuda baja ringan 177.56 m2 180,800.00 32,102,848.00
2 Pas. Genteng keramik 177.56 m2 171,300.00 30,416,028.00
3 Pas. Nok genteng keramik 38.08 m1 174,600.00 6,648,768.00
JU M LAH IV 69,167,644.00
V. PEKERJAAN PLAFOND
1 Pas. Rangka plafond besi hollow galvanish 204.80 m2 108,200.00 22,159,360.00
2 Pas. Plafond gypsum t = 9 mm 154.40 m2 51,800.00 7,997,920.00
3 Pas. Plafond GRC t = 9 mm 50.40 m2 47,800.00 2,409,120.00
JU M LAH V 32,566,400.00
VI. PEKERJAAN PELAPIS LANTAI DAN DINDING
1 Pas. Lantai granit 60/60 corak/warna 114.66 m2 227,700.00 26,108,082.00
2 Pas. Keramik lantai 25/25 KM/WC unpolished 6.30 m2 160,000.00 1,008,000.00
3 Pas. Keramik dinding 25/40 KM/WC corak/warna 21.20 m2 185,800.00 3,938,960.00
4 Pas. Granit 60/60 meja beton corak/warna 2.16 m2 227,700.00 491,832.00
5 Pas. Keramik dinding 25/60 meja beton corak/warna 4.32 m2 185,800.00 802,656.00
6 Pas. Granit tangga 20/60 corak/warna 15.00 m2 240,600.00 3,609,000.00
7 Pas. Star nossing tangga 10/60 30.00 m1 70,700.00 2,121,000.00
JU M LAH VI 38,079,530.00
VII. PEKERJAAN ELEKTRIKAL
1 Pas. Instalasi titik lampu 23.00 ttk 180,500.00 4,151,500.00
2 Pas. Instalasi titik stop kontak 10.00 ttk 180,500.00 1,805,000.00
3 Pas. Stop kontak sek. Brocco 10.00 bh 13,120.00 131,200.00
4 Pas. Stop kontak AC sek. Brocco 5.00 bh 52,500.00 262,500.00
5 Pas. Saklar seri sek. Brocco 12.00 bh 16,270.00 195,240.00
6 Pas. Lampu downlight 4" LED 14 watt sek. Philips 7.00 bh 126,100.00 882,700.00
7 Pas. Lampu downlight 4" LED 10 watt sek. Philips 3.00 bh 119,600.00 358,800.00
8 Pas. Lampu SL 18 watt sek. Philips 10.00 bh 40,420.00 404,200.00
9 Pas. Lampu SL 10 watt sek. Philips 3.00 bh 28,870.00 86,610.00
10 Pas. Exhaust fan 40 watt 2.00 unit 460,000.00 920,000.00
JU M LAH VII 9,197,750.00
VIII. PEKERJAAN PENGECATAN
1 Pengecatan dinding sekulitas catylac 531.32 m2 21,800.00 11,582,776.00
2 Pengecatan plafond sekualitas catylac 204.80 m2 19,600.00 4,014,080.00
JU M LAH VIII 15,596,856.00
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN HARGA
(Rp) (Rp)
IX. PEKERJAAN SANITAIR
1 Pas. Kloset duduk + asessories 2.00 bh 3,132,500.00 6,265,000.00
2 Pas. Jet shower 2.00 bh 150,000.00 300,000.00
3 Pas. Wastafel + asessories Pas. 3.00 bh 1,300,800.00 3,902,400.00
4 Kran air stainlees standar Pas. 2.00 bh 66,100.00 132,200.00
5 Floordrain stainlees standar 2.00 bh 77,500.00 155,000.00
6 Pas. Pipa PVC type AW Ø 4" (air kotor) 25.00 m1 128,000.00 3,200,000.00
7 Pas. Pipa PVC type AW Ø 3" (air kotor) 25.00 m1 87,500.00 2,187,500.00
8 Pas. Pipa PVC type AW Ø 2" (air kotor) 50.00 m1 51,700.00 2,585,000.00
9 Pas. Pipa PVC type AW Ø 3/4" (air bersih) 50.00 m1 22,800.00 1,140,000.00
JU M LAH IX 19,867,100.00
X. PEKERJAAN LAIN-LAIN
1 Pek. Auning spandek 37.05 m2 400,000.00 14,820,000.00
2 Pek. Rabat beton ramp pintu masuk t = 10 cm 2.21 m2 535,771.00 1,184,053.91
3 Pek. Perapihan halaman pekerjaan 1.00 ls 563,000.00 563,000.00
JU M LAH X 16,567,053.91

D. PEKERJAAN PAGAR KELILING BANGUNAN TINGGI 1,6 M


1 Pek. Sloof beton 15/20 mutu beton K-175 3.26 m3 7,953,040.00 25,911,004.32
2 Pek. Kolom beton praktis 10/10 (KP) mutu beton K-175 0.68 m3 9,079,460.00 6,210,350.64
3 Pek. Ring balok beton 15/20 mutu beton K-175 2.78 m3 7,953,040.00 22,105,474.68
4 Pas. Dinding bata ringan/hebel (uk. 10x20x60 cm) 135.31 m2 142,100.00 19,227,551.00
5 Pas. Plesteran + acian ad. 1pc : 4pp 270.62 m2 66,600.00 18,023,292.00
6 Pas. Pagar teralis besi 17.50 m2 600,000.00 10,500,000.00
7 Pas. Pintu pagar teralis besi 12.10 m2 800,000.00 9,680,000.00
8 Pek. Pengecatan dinding pagar sekulitas catylac 270.62 m2 21,800.00 5,899,516.00
9 Pek. Pengecatan besi 29.60 m2 35,800.00 1,059,680.00
JU M LAH D 118,616,868.64

E. PEKERJAAN POS JAGA (4.5 X 2,5 M)


1 Pek. Pos jaga uk. 4,5 x 2,5 M 1.00 ls 45,000,000.00 45,000,000.00
JU M LAH E 45,000,000.00

II. PELAKSANAAN K3 KONSTRUKSI

I. ALAT PELINDUNG DIRI


1 Topi Pelindung (Safety Helmet) 10.00 bh 87,900.00 879,000.00
2 Pelindung Pernafasan dan Mulut (Masker) 50.00 bh 9,900.00 495,000.00
3 Sarung Tangan (Safety Gloves) 10.00 psg 129,000.00 1,290,000.00
4 Sepatu Keselamatan (Safety Shoes) 10.00 psg 229,000.00 2,290,000.00
5 Rompi Keselamatn (Safety Vest) 10.00 bh 25,900.00 259,000.00
6 Pelindung Jatuh (Fall Arrester) 10.00 bh 59,900.00 599,000.00
JU M LAH I 5,812,000.00
II. PERSONIL K3
1 Petugas K3 (1 org) 5.00 bln 1,000,000.00 5,000,000.00
JU M LAH II 5,000,000.00
III. FASILITAS SARANA KESEHATAN
1 Peralatan P3K 1.00 pkt 1,000,000.00 1,000,000.00
2 Ruang P3K 1.00 ls 1,000,000.00 1,000,000.00
JU M LAH III 2,000,000.00
IV. RAMBU - RAMBU
1 Rambu Petunjuk 2.00 bh 150,000.00 300,000.00
2 Rambu Larangan 1.00 bh 150,000.00 150,000.00
3 Rambu Peringatan 1.00 bh 150,000.00 150,000.00
5 Rambu Informasi 1.00 bh 150,000.00 150,000.00
JU M LAH IV 750,000.00
V. LAIN - LAIN TERKAIT PENGENDALIAN RESIKO K3
1 Alat Pemadam Api Ringan (APAR) 1.00 bh 1,590,000.00 1,590,000.00
2 Sirine 1.00 bh 145,000.00 145,000.00
3 Lampu Darurat (Emergency Lamp) 2.00 bh 150,000.00 300,000.00
JU M LAH V 2,035,000.00