JUMLAH HARGA
NO URAIAN PEKERJAAN (Rp.)
1 2 3
I PEKERJAAN PERSIAPAN 18,126,337.50
PEKERJAAN PERSIAPAN 18,126,337.50
A. TOILET 2 UNIT 256,194,223.64
I PEKERJAAN TANAH 4,477,889.91
II PEKERJAAN PONDASI 26,024,508.96
III PEKERJAAN PASANGAN 9,248,760.47
IV PEKERJAAN BETON 27,303,193.25
VI PEKERJAAN PLESTERAN, DINDING & LANTAI 33,584,649.29
VII PEKERJAAN KUSEN DAN DAUN 10,957,997.74
VIII PEKERJAAN ATAP 37,973,690.31
X PEKERJAAN PLAFOND 3,723,079.79
XI PEKERJAAN INSTALASI LISTRIK 3,177,680.00
XII PEKERJAAN INTALASI AIR 32,267,061.20
XIII PEKERJAAN PENGECATAN 2,054,907.10
XIII SARANA AIR BERSIH 14,000,000.00
XIV PEKERJAAN PANEL & KABEL DAYA 51,400,805.63
B. PLAZA KULINER 537,065,848.68
B.1. LAPAK 10 LOKAL
I PEKERJAAN TANAH 19,017,411.67
II PEKERJAAN PONDASI 38,871,019.16
III PEKERJAAN PASANGAN 23,832,464.86
IV PEKERJAAN BETON 51,410,995.51
VI PEKERJAAN PLESTERAN, DINDING & LANTAI 82,253,315.35
VII PEKERJAAN KUSEN DAN DAUN 32,879,983.34
VIII PEKERJAAN ATAP 97,288,583.98
X PEKERJAAN PLAFOND 20,577,097.61
XI PEKERJAAN INSTALASI LISTRIK 26,669,940.00
XII PEKERJAAN INTALASI AIR 9,195,124.40
XIII PEKERJAAN PENGECATAN 6,251,598.98
XIII PEKERJAAN ALUMINIUM 31,278,500.00
B.2. KURSI PENGUNJUNG 20 UNIT
I PEKERJAAN TANAH 1,100,073.33
II PEKERJAAN BETON 15,764,140.21
III PEKERJAAN KURSI DAN MEJA 80,675,600.28
H. FASILITAS KEBERSIHAN 170,537,145.36
a). Tempat Sampah
I PEKERJAAN TANAH 1,899,234.03
II PEKERJAAN PONDASI 5,410,368.33
III PEKERJAAN PASANGAN 2,263,262.57
IV PEKERJAAN BETON 4,890,336.24
V PEKERJAAN PLESTERAN, DINDING & LANTAI 1,983,091.79
VI PEKERJAAN BESI 5,059,294.04
b). Sanitasi
I PEKERJAAN TANAH 5,859,245.16
II PEKERJAAN PASANGAN 17,873,387.84
III PEKERJAAN BETON 14,098,925.37
c). Pengadaan Tempat Sampah 55,200,000
d). Septictank & IPAL 24,000,000
e). Tempat Cuci Tangan 32,000,000
I. KIOS CINDERAMATA 42,109,388.69
I PEKERJAAN TANAH 1,373,103.73
II PEKERJAAN PONDASI 3,806,765.42
IV PEKERJAAN BETON 9,766,415.08
V PEKERJAAN PLESTERAN, DINDING & LANTAI 1,990,467.04
VI PEKERJAAN ATAP 19,907,711.60
VII PEKERJAAN PLAFOND 2,765,119.50
VIII PEKERJAAN INSTALASI LISTRIK 1,705,330.00
X PEKERJAAN PENGECATAN 794,476.32
Disetujui Oleh :
Pejabat Pembuat Komitmen Dibuat Oleh :
Dinas Pariwisata Konsultan Perencana
Kabupaten Lombok Barat CV. Wanda Konsultan
Mengetahui :
Kepala Dinas Pariwisata
Kabupaten Lombok Barat
3 Pipa pvc diam. 3 inc. dan accessories m1 26.00 A.5.1.1 31 Rp 60,941.65 Rp 1,584,482.90
4 Pipa pvc diam. 4 inc. dan accessories m1 30.00 A.5.1.1 32 Rp 77,991.65 Rp 2,339,749.50
4 Kran air bh 8.00 A.5.1.1.19. Rp 74,822.00 Rp 598,576.00
5 Floor drain bh 4.00 A.5.1.1.14.a Rp 64,641.50 Rp 258,566.00
7 Wastafel bh 4.00 A.5.1.1 5. Rp 1,073,974.00 Rp 4,295,896.00
8 Closet duduk bh 4.00 A.5.1.1.1. Rp 2,821,445.00 Rp 11,285,780.00
9 Peresapan bh 2.00 A.8.4.1.5a Rp 2,821,445.00 Rp 5,642,890.00
SUB TOTAL (XII)PEKERJAAN INTALASI AIR Rp 32,267,061.20
XIII PEKERJAAN PENGECATAN
1 Cat Dinding m2 54.06 A.4.7.1.10.a Rp 38,011.60 Rp 2,054,907.10
SUB TOTAL (XIII) PEKERJAAN PENGECATAN Rp 2,054,907.10
XIII SARANA AIR BERSIH
1 Pengadaan Tendon Air 2000L bh 3.00 LS Rp 4,100,000.00 Rp 12,300,000.00
2 Jet Pump Kap. 250 Watt PC-276BIT bh 1.00 LS Rp 1,700,000.00 Rp 1,700,000.00
SUB TOTAL (XIII) SARANA AIR BERSIH Rp 14,000,000.00
XIV PEKERJAAN PANEL & KABEL DAYA
1 Pengadaan daya listrik PLN (Kwh) Phase 3.00 LS Rp 5,000,000.00 Rp 15,000,000.00
2 Instalasi Kabel Tanam, NYY 4x6 mm2 m1 196.00 A.8.4.6.ME.9a Rp 146,300.00 Rp 28,674,800.00
5 Inst. Panel MDP unit 1.00 A.8.4.6.ME.7a Rp 4,935,040.00 Rp 4,935,040.00
6 Inst. Panel SDP unit 1.00 A.8.4.6.ME.7b Rp 2,790,965.63 Rp 2,790,965.63
SUB TOTAL (XIV) PEKERJAAN LAMPU Rp 51,400,805.63
B. PLAZA KULINER Rp 537,065,848.68
B.1. LAPAK 10 LOKAL Rp 439,526,034.86
I PEKERJAAN TANAH
1 Galian Tanah Pondasi Batu Kali m3 67.93 A.2.3.1.1. Rp 79,062.50 Rp 5,370,399.38
2 Mengurug kembali m3 22.64 A.2.3.1.9. Rp 57,475.00 Rp 1,301,348.95
3 Urugan Pasir Bawah Lantai dan Pondasi m3 9.26 A.2.3.1.11.a Rp 292,985.00 Rp 2,712,674.87
4 Urugan Tanah peninggian lantai m3 40.37 A.2.3.1.14.a Rp 238,617.50 Rp 9,632,988.48
SUB TOTAL (I) PEKERJAAN TANAH Rp 19,017,411.67
II PEKERJAAN PONDASI
1 Pasangan Batu Kosong m3 19.37 A.3.2.1.9.a Rp 521,650.80 Rp 10,106,462.60
2 Pasangan Pondasi Batu Kali 1 PC : 5 PS m3 33.22 A.3.2.1.3. Rp 865,801.20 Rp 28,764,556.56
SUB TOTAL (II) PEKERJAAN PONDASI Rp 38,871,019.16
III PEKERJAAN PASANGAN
1 Pasangan Dinding 1/2 bata 1 pc : 5 ps m2 122.99 A. 4.4.1.10.a Rp 193,772.48 Rp 23,832,464.86
SUB TOTAL (III)PEKERJAAN PASANGAN Rp 23,832,464.86
IV PEKERJAAN BETON
1 Rabat beton bawah keramik m3 4.25 A.A.4.1.1.4.a Rp 942,521.58 Rp 4,002,182.28
2 Beton sloof S1 15/20
- Beton K 175 m3 2.32 A. A.4.1.1.6.a Rp 1,147,738.14 Rp 2,659,883.13
- Pembesian dengan besi polos (Tulangan Pokok) kg 290.02 A.4.1.1.17 Rp 15,924.15 Rp 4,618,334.72
- Pembesian dengan besi polos Ǿ8 (Besi Sengkang) kg 141.91 A.4.1.1.17 Rp 15,924.15 Rp 2,259,759.50
- Bekisting sloof 2 x pakai m2 32.66 A.4.1.1.21 Rp 205,150.00 Rp 6,700,199.00
2 Kolom K.1 20x20 cm
- Beton K 175 m3 1.62 A. A.4.1.1.6.a Rp 1,147,738.14 Rp 1,860,626.99
- Pembesian dengan besi polos (Tulangan Pokok) kg 511.84 A.4.1.1.17 Rp 15,924.15 Rp 8,150,667.89
- Pembesian dengan besi polos Ǿ8 (Besi Sengkang) kg 98.66 A.4.1.1.17 Rp 15,924.15 Rp 1,571,084.07
- Bekisting kolom 2 x pakai m2 43.23 B.24.b Rp 74,365.50 Rp 3,214,820.57
3 Kolom praktis 10/10 m1 26.55 A.4.1.1.35 Rp 97,759.20 Rp 2,595,506.76
4 Beton Ring Balok 15/20
- Beton K 175 m3 0.71 A. A.4.1.1.6.a Rp 1,147,738.14 Rp 809,155.39
- Pembesian dengan besi polos (Tulangan Pokok) kg 83.47 A.4.1.1.17 Rp 15,924.15 Rp 1,329,220.65
- Pembesian dengan besi polos Ǿ8 (Besi Sengkang) kg 38.37 A.4.1.1.17 Rp 15,924.15 Rp 610,972.48
- Bekisting balok 2 x pakai m2 9.40 B.23.b Rp 89,325.50 Rp 839,659.70
5 Beton Meja Tebal 10 cm
- Beton K 200 m3 1.72 A. A.4.1.1.6.a Rp 1,147,738.14 Rp 1,976,405.07
- Pembesian dengan besi polos (Tulangan Pokok) kg 212.38 A.4.1.1.17 Rp 15,924.15 Rp 3,381,970.98
- Bekisting lantai 3 x pakai m2 12.05 A.4.1.1.24 Rp 199,936.00 Rp 2,410,028.54
6 balok latei 10/10 m1 24.76 A.4.1.1.35 Rp 97,759.20 Rp 2,420,517.79
SUB TOTAL (IV)PEKERJAAN BETON Rp 51,410,995.51
VI PEKERJAAN PLESTERAN, DINDING & LANTAI
1 Lantai keramik ukuran 40 cm x 40 cm KW II m2 112.69 A.4.4.3.36.a Rp 243,500.40 Rp 27,439,767.88
2 Keramik Dinding Meja Dapur 40x40 cm KW II m2 24.48 A.4.4.3.50.c Rp 335,491.20 Rp 8,211,147.12
6 Plesteran 1 pc : 5 ps m2 272.99 A.4.4.2.5.a Rp 129,139.82 Rp 35,254,397.11
8 Acian m2 287.40 A.4.4.2.27. Rp 39,484.50 Rp 11,348,003.24
SUB TOTAL (VI) PEKERJAAN PLESTERAN, DINDING & LANTAI Rp 82,253,315.35
VII PEKERJAAN KUSEN DAN DAUN
1 Pintu P2 unit 10.00 P.2 Rp 2,410,605.18 Rp 24,106,051.82
2 Buffen BN 1 unit 10.00 BN 1 Rp 877,393.15 Rp 8,773,931.52
SUB TOTAL (VII) PEKERJAAN KUSEN DAN DAUN Rp 32,879,983.34
VIII PEKERJAAN ATAP
1 Rangka atap Besi Hollow Galvanis m2 132.75 A.4.2.1.22.b Rp 238,464.68 Rp 31,656,186.72
2 Reng baja ringan 32.45 mm m2 132.75 A.4.2.1.22.f Rp 248,818.16 Rp 33,030,611.15
3 Atap Onduline Tile m2 132.75 A.4.5.2.32.a. Rp 182,945.95 Rp 24,286,074.86
5 Listplank kalsiplang L. 2 x 08/20 cm + rangka hollow ( L1) m1 65.10 A.4.5.1.7.b Rp 127,737.50 Rp 8,315,711.25
SUB TOTAL (VIII) PEKERJAAN ATAP Rp 97,288,583.98
X PEKERJAAN PLAFOND
1 Rangka plafond hollow galvalum modul 60x60 cm m2 66.98 A.4.2.1.21.c Rp 190,701.50 Rp 12,772,232.96
NOMOR HARGA TOTAL
No. URAIAN PEKERJAAN SAT VOLUME ANALISA SATUAN HARGA
P.1 Pintu P1
Kusen pintu kayu klas II 0.082 m3 A.4.6.1.2. 12,350,525.00 1,011,508.00
Daun pintu panil kayu klas II 2.698 m2 A.4.6.1.5. 832,150.00 2,245,473.56
Kaca 5 mm 1.772 m2 A.4.6.2.17. 120,204.15 213,001.75
Handle pintu 1.000 unit A.4.6.2.12. 237,561.50 237,561.50
Engsel pintu 6.000 bh A.4.6.2.5. 64,104.15 384,624.90
Kunci pintu 1.000 bh A.4.6.2.2. 149,891.50 149,891.50
4,242,061.21
P.2 Pintu P2
Kusen pintu kayu klas II 0.032 m3 A.4.6.1.2. 12,350,525.00 397,378.14
Daun pintu panil kayu klas II 1.723 m2 A.4.6.1.5. 832,150.00 1,433,461.59
Handle pintu 1.000 unit A.4.6.2.12. 237,561.50 237,561.50
Engsel pintu 3.000 bh A.4.6.2.5. 64,104.15 192,312.45
Kunci pintu 1.000 bh A.4.6.2.2. 149,891.50 149,891.50
2,410,605.18
BN 1 Bufen Lapak
Kusen jendela kayu klas II 0.023 m3 A.4.6.1.2. 12,350,525.00 284,185.58
Daun Buffen kayu klas II 0.360 m2 A.4.6.1.6. 601,370.00 216,493.20
Kaca 5 mm 0.244 m2 A.4.6.2.17. 120,204.15 29,305.77
Engsel jendela 4.000 bh A.4.6.2.5. 64,104.15 256,416.60
KODE URAIAN PEKERJAAN VOLUME KODE ANALISA HARGA SATUAN JUMLAH HARGA
BN 2 Bufen Toilet
Kusen Aluminium 2.040 m1 A.4.6.1.2. 137,008.85 279,498.05
Daun Jendela Rangka Aluminium 0.189 m2 A.4.6.1.6. 242,723.25 45,874.69
Kaca 5 mm 0.121 m2 A.4.6.2.17. 120,204.15 14,544.70
Engsel jendela 2.000 bh A.4.6.2.5. 64,104.15 128,208.30
Gerendel jendela 1.000 bh A.4.6.2.11.a 45,496.00 45,496.00
513,621.75
HARGA SATUAN UPAH DAN BAHAN
A. UPAH
1 Pekerja L.01 OH 91,500.00
2 Tukang L.02 OH 110,000.00
3 Tukang batu L.02 OH 110,000.00
4 Tukang kayu L.02 OH 110,000.00
5 Tukang besi L.02 OH 110,000.00
6 Tukang besi konstruksi L.02 OH 110,000.00
7 Tukang cat L.02 OH 110,000.00
8 Tukang las L.02 OH 110,000.00
9 Tukang las konstruksi L.02 OH 110,000.00
10 Tukang alumunium L.02 OH 110,000.00
11 Tukang Listrik L.02 OH 110,000.00
12 Kepala tukang L.03 OH 120,000.00
13 Mandor L.04 OH 130,000.00
14 Desain engineer OH 110,000.00
15 Operator printer OH 91,500.00
B BAHAN/MATERIAL
1 Pasir urug m3 149,000.00
2 Pasir pasang m3 168,000.00
3 Pasir beton m3 187,000.00
4 Batu belah m3 189,200.00
5 Kerikil (Maks 30 mm) m3 322,000.00
6 Kerikil m3 300,000.00
7 Tanah urug m3 110,000.00
8 Air Liter 10.00
9 Semen portland Kg 1,260.00 63,000
10 Semen warna Kg 15,000.00
11 Waterproofing Kg 50,000.00
12 Bata merah buah 800.00
13 Bata ekspos buah 1,600.00
13 Paving block type kotak 20 x 20 tebal 8 cm, K 200 m2 95,000.00
14 Keramik ukuran 30x30 cm doos 60,500.00
15 Keramik ukuran 60cm x 60 cm KW I doos 110,000.00
16 Keramik motif kayu 60cm x 60 cm KW II doos 106,000.00
17 Keramik ukuran 25x25 cm doos 60,500.00
18 Keramik Dinding 25 x 40 cm buah 77,000.00
19 Granit tile 60 x 60 cm m2 180,000.00
20 Batu Templek m2 65,000.00
21 Batu Candi m2 159,500.00
22 Bata Tempel m2 114,000.00
23 Decking Solid 290x15x2,5 btg 456,000.00
24 Rangka Wpc 290x5x2,5 btg 195,000.00
25 Siku / Plank WPC btg 140,000.00
26 Plastic Clip+Screw bh 1,300.00
27 Fischer+Screw bh 1,100.00
28 Starting Clip+Screw bh 4,500.00
29 Screw Pcs 1,200.00
29 Atap metal roof dengan butiran m2 90,000.00
30 Bubungan metal roof dengan butiran bh 108,900.00
31 Balok kayu kelas II m3 7,000,000.00
32 Kayu kelas III m3 4,500,000.00
33 Kayu kelas IV m3 3,000,000.00
34 Kayu 5/7 m3 3,000,000.00
35 Kayu balok 5/7 m3 3,000,000.00
36 Kayu papan 3/20 m3 3,000,000.00
37 Dolken kayu diameter 8-10/400 cm Batang 38,500.00
38 Kaso-kaso 5 x 7cm m3 7,000,000.00
39 Reng 2 x 3 cm kg 7,000,000.00
40 Balok kayu, 6 x 12 m3 7,000,000.00
No. Uraian Kode Sat Harga Satuan Ket.
41 Papan kayu kelas II m3 7,000,000.00
42 Balok kayu m3 7,000,000.00
43 Perancah kayu m3 3,000,000.00
44 Bambu diameter 6-8/600 cm Batang 10,000.00
45 Bambu diameter 8-10/400 cm Batang 12,000.00
46 Plywood tebal 9 mm Lbr 120,000.00
47 Blockwood Ukuran (90 x 220) cm Lbr 190,000.00
48 Polywood 12 mm Lbr 220,000.00
49 Triplek tebal 3 mm Lbr 60,000.00
50 Paku 1/2 " - 1 " Pcs 300.00
51 Paku biasa ½”-1” Kg 15,000.00
52 Paku 1 cm – 2,5 cm kg 15,000.00
53 Paku 2”-3” Kg 15,000.00
54 Paku biasa 2”-5” Kg 15,000.00
55 Paku 5 dan 10 cm Kg 15,000.00
56 Paku 5 – 10 cm Kg 15,000.00
57 Paku 5 cm – 12 cm Kg 15,000.00
58 Paku 5 dan 7 cm Kg 15,000.00
59 Paku 7 cm – 10 cm Kg 15,000.00
60 Paku 10 cm Kg 15,000.00
61 Paku 12 cm Kg 15,000.00
Paku hak panjang 15 cm
62 Kg 20,350.00
63 Besi beton kg 12,500.00
64 Besi beton polos kg 12,000.00
65 Besi beton ulir kg 13,000.00
66 Kawat beton kg 22,000.00
67 Besi baja IWF Kg 17,600.00
68 Besi Profil Kg 17,600.00
69 Plat Besi Lembar 600,000.00
70 Skrup fixer buah 18,150.00
71 Paku skrup Kg 11,000.00
72 Paku dan Skrup bh 1,300.00
73 Besi Strip 30 x 3 mm Kg 17,600.00
74 Besi strip tebal 5 mm kg 17,600.00
75 Kawat las listrik Kg 37,400.00
76 Profil alluminium m 70,000.00
77 Alluminium strip m 65,000.00
78 Ram alluminium m 65,000.00
79 Frame allumunium L.10.10.1 kg 18,300.00
80 Aluminium gel tebal 0,45 M2 39,062.50
81 Spandrel Aluminium CA 10Cm x 0.8mm x 6M white lbr 151,000.00
82 Nok standar 40 x 18 buah 25,000.00
83 Besi scuare tube m 17,500.00
84 Besi lis kaca (1 x 1) cm m 15,000.00
85 Rangka metal hollow 40.40.2 mm m 17,500.00
86 Rangka metal hollow 40.40.0,4 mm m 7,500.00
87 Hollow 20.40.2 mm m 15,000.00
88 Baja ringan canai dingin C75 m 14,000.00
89 Profil kaca m 15,000.00
90 Sealant Tube 30,000.00
91 Aluminium Composite Panel (t = 4mm) m2 450,000.00
92 Besi Hollo (2x4)cm kg 17,600.00
93 Gypsum Board 120 x 240 x 9 mm Lembar 82,500.00
94 List Gypsum Profil m 17,500.00
95 Tepung Gypsum Kg 17,500.00
96 Calsiplank m 17,500.00
97 Calsiboard t = 3 mm m2 70,000.00
98 Calsiboard t = 6 mm m2 114,000.00
99 Plywood tebal 4 mm Ukuran (90 x 220) cm Lembar 57,200.00
100 Plywood 4 mm, 120 x 240 Lembar 57,200.00
101 Multiplek tebal 9 mm Lembar 92,700.00
102 HPL Lembar 185,000.00
103 Kunci tanam biasa buah 73,700.00
No. Uraian Kode Sat Harga Satuan Ket.
104 Kunci tanam KM buah 73,700.00
105 Engsel pintu buah 38,500.00
106 Engsel casement buah 11,000.00
107 Engsel angin buah 11,000.00
108 Kait angin buah 5,500.00
109 Door closer set 430,000.00
110 Kunci slot buah 65,000.00
111 Door holder buah 150,000.00
112 Door stop buah 38,500.00
113 Rambuncis buah 15,000.00
114 Kaca tebal 5 mm m2 80,000.00
115 Kaca tebal 8 mm m2 185,000.00
116 Cat menie Kg 33,000.00
117 Plamuur Kg 12,500.00
118 Cat Besi Kg 57,000.00
119 Ampelas Lbr 5,000.00
120 Politur L 60,000.00
121 Politur jadi L 82,500.00
122 Cat dasar Kg 24,000.00
123 Cat penutup Kg 68,000.00
124 Cat Kayu Mutu Menengah Kg 67,100.00
125 Cat Kayu Mutu Tinggi Kg 93,500.00
126 Cat Tembok Mutu Biasa Kg 24,000.00
127 Cat Tembok Mutu Menengah Kg 65,000.00
128 Cat Tembok Mutu Tinggi Kg 121,000.00
128 Pelapis Coating Batu Bata Kg 163,000.00
129 Wall paper Kg 50,000.00
130 Ampelas Lbr 5,500.00
131 Lem Kg 25,000.00
132 Lem kayu Kg 25,000.00
133 Sealant Kg 35,000.00
134 Soda api Kg 38,115.00
135 Sabun Kg 10,000.00
136 Residu Liter 8,360.00
137 Meni besi Liter 30,000.00
138 Solar Liter 15,180.00
139 Minyak pelumas Liter 33,000.00
140 Residu atau ter L 8,360.00
141 Minyak bekisting L 6,400.00
142 Kuas buah 16,500.00
143 Closet duduk Unit 2,000,000.00
144 Closet jongkok Unit 200,000.00
145 Urinoir Unit 1,937,000.00
146 Wastafel Unit 600,000.00
147 Bak Fiberglass 0,30 M3 Unit 413,000.00
148 Waterdrain buah 45,000.00
149 Floor drain Unit 45,000.00
150 Roof drain Unit 75,000.00
151 Kran air M 17,600.00
152 Jet Shower Unit 150,000.00
153 Sealtape Buah 2,200.00
154 Pipa galvanis ½” M 37,400.00
155 Pipa galvanis 3/4” M 37,400.00
156 Pipa galvanis 1” M 52,800.00
157 Pipa GI Medium A Dia. 160 mm (6,29921 Inc) M 73,666.67
158 Pipa GI Medium A Dia. 110 mm (4,33071 Inc) M 49,166.67
159 Pipa GI Medium A Dia. 63 mm (2,48031 Inc) M 20,166.67
160 Pipa GI Medium A Dia. 50 mm 1,9685 Inc M 15,583.33
161 Pipa GI Medium A Dia. 20 mm (0,7874 Inc) M 6,783.33
162 Pipa GI Medium A Dia. 40 mm (1,5748 Inc) M 12,283.33
163 Pipa listrik 5/8 " btg 16,000.00
164 Pipa stainless steel 1” M 20,000.00 120000
165 Pipa stainless steel 2” M 35,000.00 210,000.00
166 Pipa PVC 1/2” M 4,000.00
No. Uraian Kode Sat Harga Satuan Ket.
167 Pipa PVC ¾” M 4,400.00
168 Pipa PVC 1” M 6,600.00
169 Pipa PVC 1,5” M 11,000.00
170 Pipa PVC 2” M 12,500.00
171 Pipa PVC 2,5” M 15,000.00
172 Pipa PVC 3” M 20,000.00
173 Pipa PVC 4” M 30,000.00
174 Pipa PVC Ø 63 mm M 15,000.00
175 Pipa PVC Ø 90 mm M 25,000.00
176 Pipa PVC Ø 110 mm M 30,000.00
177 Pipa listrik 5/8” btg 5,000.00
178 Instalasi Kabel NYM 4x6 mm2 m 65,000.00
179 Instalasi Kabel NYM 4x4 mm2 m 45,000.00
180 Kabel NYM 3 x 2,5 m 13,000.00 500000
181 Kabel NYM 2 x 1,5 m 5,000.00 250000
182 T Dus buah 2,500.00
183 L Bow buah 1,500.00
184 Las Dop buah 1,000.00
185 Klem buah 100.00
186 Mongkok buah 2,500.00
187 Saklar buah 16,500.00
188 Fi ng buah 15,000.00
189 Saklar tunggal buah 15,000.00
190 Saklar ganda buah 20,000.00
191 Stop Kontak Stop kontak no.6600 23,000.00
191 Panel SDP, 75 A (19 MCB 10 A + 1 MCB 20 A) buah 2,000,000.00
192 Panel SDP, 75 A (17 MCB 10 A) buah 1,000,000.00
193 Panel MDP 3 x 63 A buah 1,000,000.00
194 Gebalan rumput m2 20,000.00
195 Banner plastik m2 25,000.00
196 Baut diam. 19 mm buah 750.00
197 Baut diam. 22 mm buah 1,000.00
198 Baut diam. 25 mm buah 2,500.00
199 Acrilic cm2 150.00
200 Lampu TL RM 2X18 Watt buah 150,000.00
201 Lampu Led Bulb 12 Watt Philips MyCare 12W Kuning buah 51,000.00
202 Lampu Down Light (IRD - 150) 18 Watt buah 50,000.00
203 Lampu Hologen 150 Watt buah 150,000.00
204 Lampu TL LED Tube 9 W buah 35,000.00
205 Lampu DL LED Panel 12 W buah 90,000.00
206 Lampu Edison LED 4 Watt Bohlam Kuning buah 34,800.00
207 Rambatan stainless steel buah 250,000.00
208 Koral sikat kg 5,500.00
209 HCL ltr 11,000.00
210 Pompa air unit 1,000,000.00
211 Buis beton 30 cm, panjang 1 m bh 85,800.00
212 Panel UPVC + Ass. m2 515,000.00
213 HPL m2 185,000.00
214 Kaca tempered t = 12 mm m2 1,750,000.00
215 Patch Fitting merek KOLF m2 623,700.00
216 Floor Hinges m2 623,700.00
217 Handle Stainles Steel Letter ” U ” standard P = 35 cm m2 350,000.00
218 Kunci m2 1,247,400.00
219 Aluminium foil m2 8,800.00
220 keramik kasar oscar grey asia 40x40 m2 68,400.00
221 Baja Ringan Reng 32.45 TASO m 7,600.00
222 Besi wiremes M8 D8 kg 11,921.00
223 Atap spandek 0.35 mm, L 70 cm m 49,500.00
224 Genteng Bitumen Bergelombang Monolayer Lembar 165,000.00
225 Paku anti karat bh 1,750.00
226 Nok / Ridge Onduline m 90,000.00
227 Kain Ondutis m 38,866.67
228 Atap Shing Bitumen - Bardoline Pack 642,750.00
229 Underlayer - Ondutis Roll 1,584,000.00
No. Uraian Kode Sat Harga Satuan Ket.
230 Atap Onduvilla Lembar 54,390.00
231 Keramik Lantai KW II 40 x 40 cm m2 78,000.00
232 Keramik Dinding KW II 25 x 40 cm m2 76,000.00
233 Keramik Lantai KW II 30 x 30 cm m2 55,000.00
234 Keramik Lantai Kamar Mandi Kasar KW II 40 x 40 m2 130,000.00
235 Bio Septic Tank 1000 L buah 3,507,500.00
236 Pengadaan + Pemasangan Mesin Pompa Boster bh 6,000,000.00
237 Rolling Dor Aluminium m2 330,000.00
238 Besi Hollow Galvanis 40x60x2 mm m1 43,800.00
239 Besi Hollow Galvanis 40x60x1.2 mm m1 38,833.33
240 Besi Hollow Galvanis 40x40x2 mm m1 29,800.00
241 Besi Hollow Galvanis 40x40x1 mm m1 13,400.00
241 Tong Sampah Besar Roda 240 Liter bh 790,000.00
242 Jet Pump Kap. 250 Watt PC-276BIT unit 1,700,000.00
243 Tendon Air 2000 L bh 4,100,000.00
244 U-ditch 80x80x120 cm bh 945,000.00
245 Paving Block Type Bata 20 x 10 cm Tebal 6 cm K200 m2 90,000.00
246 Dudukan Batu Ukir Custem bh 500,000.00
247 Kap Lampu Taman Custem bh 200,000.00
248 Kap Lampu Jalan bh 450,000.00
249 Lampu Sorot LED 20 WATT bh 80,000.00
250 Kubah Stainless Stel bh 780,000.00
251 Box MCB bh 17,000.00
252 MCB bh 50,000.00
253 Box Panel uk. 40x60 cm Out door 560,000.00
254 MCCB 3 Phasa 50 A bh 900,000.00
255 MCCB 3 Phasa 25 A bh 419,241.49
256 MCCB 1 Phasa 10 A bh 120,000.00
257 Plat Tembaga yang sudah jadi set 84,000.00
258 Sisir tembaga 3 ps bh 58,000.00
259 Sisir tembaga 1 ps bh 52,000.00
260 Rel MCB m 38,000.00
261 Mur + Baut set 6,000.00
262 Mata bor bh 62,000.00
263 Kabel NYA 35mm2 m 40,000.00
264 Skun kabel 35 mm bh 18,000.00
265 Skun 2,5 mm2 bh 6,200.00
266 CT Amp Meter bh 110,000.00
267 Voltmeter bh 173,000.00
268 Selector Switch bh 114,000.00
269 Indicator Lamp bh 52,000.00
270 Isolasi 3M bh 24,000.00
271 kondom kabel RST bh 13,000.00
272 Spiral Kabel m 8,000.00
273 Kabel Ties 15 cm bh 1,300.00
274 NYAF 2,5mm2 m 2,500.00
275 Terminal Block bh 45,000.00
276 MCB 6A m` 21,000.00
277 Box Panel uk. 30x40 cm Out door 98,000.00
278 Kawat las btg 12,000.00
T.15 Analisa Angkutan Material dan atau Hasil Galian
T.15.a.6 Mengangkut 1 m3 material atau hasil galian dengan jarak angkut 100m
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.600 91,500.00 54,900.00
Mandor L.04 OH 0.030 130,000.00 3,900.00
JUMLAH TENAGA KERJA 58,800.00
B BAHAN
A TENAGA
Pekerja L.01 OH 0.033 91,500.00 3,019.50
Mandor L.04 OH 0.016 130,000.00 2,080.00
JUMLAH TENAGA KERJA 5,099.50
B BAHAN
Excavator jam 1.000 349,359.00 349,359.00
Alat bantu Set 1.000 5,000.00 5,000.00
JUMLAH HARGA BAHAN 354,359.00
C PERALATAN
A.3.2.1.9.a (K3) Pemasangan 1 m3 batu kosong (anstamping) (dengan jarak langsiran 100m)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.780 91,500.00 71,370.00
Tukang batu L.02 OH 0.390 110,000.00 42,900.00
Kepala tukang L.03 OH 0.039 120,000.00 4,680.00
Mandor L.04 OH 0.039 130,000.00 5,070.00
JUMLAH TENAGA KERJA 124,020.00
B BAHAN
Batu belah m3 1.200 189,200.00 227,040.00
Pasir urug m3 0.432 149,000.00 64,368.00
Langsiran dengan Jarak 100 m (T.15.a.6) OH 1.000 58,800.00 58,800.00
JUMLAH HARGA BAHAN 350,208.00
C PERALATAN
P.02.d.1.a (K3) Pemasangan Bata Merah 1 m3 1PC : 5PS (dengan jarak langsiran 100m)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 2.400 91,500.00 219,600.00
Tukang batu L.02 OH 1.200 110,000.00 132,000.00
Mandor L.04 OH 0.240 130,000.00 31,200.00
JUMLAH TENAGA KERJA 382,800.00
B BAHAN
Bata merah bh 500.000 800.00 400,000.00
Semen portland kg 89.000 1,260.00 112,140.00
Pasir Pasang m3 0.410 168,000.00 68,880.00
Langsiran dengan Jarak 100 m (T.15.a.6) OH 1.000 58,800.00 58,800.00
JUMLAH HARGA BAHAN 639,820.00
C PERALATAN
A. A.4.1.1.6.a Membuat 1 m3 beton mutu f’c = 16,9 MPa, slump (120 ± 20) mm K.200 (dengan jarak langsiran 100m)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 1.650 91,500.00 150,975.00
Tukang batu L.02 OH 0.275 110,000.00 30,250.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 130,000.00 10,790.00
JUMLAH TENAGA KERJA 195,375.00
B BAHAN
Semen Portland kg 352.000 1,260.00 443,520.00
Pasir beton m3 0.522 187,000.00 97,640.71
Kerikil (Maks 30 mm) m3 0.764 322,000.00 245,912.59
Air Liter 215.000 10.00 2,150.00
Langsiran dengan Jarak 100 m (T.15.a.6) OH 1.000 58,800.00 58,800.00
JUMLAH HARGA BAHAN 848,023.31
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.007 91,500.00 640.50
Tukang besi L.02 OH 0.007 110,000.00 770.00
Kepala tukang L.03 OH 0.001 120,000.00 84.00
Mandor L.04 OH 0.000 130,000.00 52.00
JUMLAH TENAGA KERJA 1,546.50
B BAHAN
Besi wiremes M8 D8 kg 1.050 11,921.00 12,517.05
JUMLAH HARGA BAHAN 12,517.05
C PERALATAN
JUMLAH HARGA ALAT
A TENAGA
Pekerja L.01 OH 0.520 91,500.00 47,580.00
Tukang besi L.02 OH 0.260 110,000.00 28,600.00
Kepala tukang L.03 OH 0.026 120,000.00 3,120.00
Mandor L.04 OH 0.026 130,000.00 3,380.00
JUMLAH TENAGA KERJA 82,680.00
B BAHAN
Kayu kelas III kg 0.040 4,500,000.00 180,000.00
Paku 5 – 10 cm kg 0.300 15,000.00 4,500.00
Minyak bekisting Liter 0.100 6,400.00 640.00
JUMLAH HARGA BAHAN 185,140.00
PEMAKAIN BEKISTING 2 X 92,570.00
C PERALATAN
JUMLAH HARGA ALAT
A TENAGA
Pekerja L.01 OH 0.660 91,500.00 60,390.00
Tukang kayu L.02 OH 0.330 110,000.00 36,300.00
Kepala tukang L.03 OH 0.033 120,000.00 3,960.00
Mandor L.04 OH 0.033 130,000.00 4,290.00
JUMLAH TENAGA KERJA 104,940.00
B BAHAN
Kayu balok 5/7 m3 0.015 3,000,000.00 45,000.00
Plywood tebal 9 mm Lbr 0.350 120,000.00 42,000.00
Paku 5 cm – 12 cm kg 0.400 15,000.00 6,000.00
Bambu diameter 6-8/600 cm batang 6.000 10,000.00 60,000.00
Minyak bekisting Liter 0.100 6,400.00 640.00
JUMLAH HARGA BAHAN 153,640.00
PEMAKAIN BEKISTING 2 X 76,820.00
C PERALATAN
JUMLAH HARGA ALAT
A TENAGA
Pekerja L.01 OH 0.660 91,500.00 60,390.00
Tukang kayu L.02 OH 0.330 110,000.00 36,300.00
Kepala tukang L.03 OH 0.033 120,000.00 3,960.00
Mandor L.04 OH 0.033 130,000.00 4,290.00
JUMLAH TENAGA KERJA 104,940.00
B BAHAN
Kayu balok 5/7 m3 0.020 3,000,000.00 60,000.00
Plywood tebal 9 mm Lbr 0.700 17,600.00 12,320.00
Paku 5 cm – 12 cm kg 0.800 15,000.00 12,000.00
Bambu diameter 6-8/600 cm batang 3.000 11,000.00 33,000.00
Minyak bekisting Liter 0.100 6,400.00 640.00
JUMLAH HARGA BAHAN 117,960.00
C PERALATAN
JUMLAH HARGA ALAT
B.24.b Pemasangan 1 m2 bekis ng untuk kolom beton biasa menggunakan plywood (digunakan berulang)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.220 91,500.00 20,130.00
Tukang kayu L.02 OH 0.110 110,000.00 12,100.00
Kepala tukang L.03 OH 0.011 120,000.00 1,320.00
Mandor L.04 OH 0.022 130,000.00 2,860.00
JUMLAH TENAGA KERJA 36,410.00
B BAHAN
Kaso-kaso 5 x 7cm m3 0.006 7,000,000.00 42,000.00
Paku 5 cm – 12 cm kg 0.250 15,000.00 3,750.00
Minyak bekisting Liter 0.200 6,400.00 1,280.00
Plywood tebal 9 mm Lbr 0.128 120,000.00 15,360.00
JUMLAH HARGA BAHAN 62,390.00
PEMAKAIN BEKISTING 2 X 31,195.00
C PERALATAN
JUMLAH HARGA ALAT
B.23.b Pemasangan 1 m2 bekisting untuk balok beton biasa menggunakan multipleks tebal 12 mm, JAT < 1,0 m
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.240 91,500.00 21,960.00
Tukang kayu L.02 OH 0.120 110,000.00 13,200.00
Kepala tukang L.03 OH 0.012 120,000.00 1,440.00
Mandor L.04 OH 0.024 130,000.00 3,120.00
JUMLAH TENAGA KERJA 39,720.00
B BAHAN
Polywood 12 mm Lbr 0.128 220,000.00 28,160.00
Kayu kelas III m3 0.011 4,500,000.00 49,500.00
Paku 5 – 10 cm kg 0.250 15,000.00 3,750.00
Minyak bekisting Liter 0.200 6,400.00 1,280.00
Bambu diameter 6-8/600 cm btg 4.000 10,000.00 40,000.00
JUMLAH HARGA BAHAN 122,690.00
C PERALATAN
JUMLAH HARGA ALAT
A TENAGA
Pekerja L.01 OH 0.297 91,500.00 27,175.50
Tukang batu L.02 OH 0.033 110,000.00 3,630.00
Tukang kayu L.02 OH 0.033 110,000.00 3,630.00
Tukang besi L.02 OH 0.033 110,000.00 3,630.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 41,215.50
B BAHAN
Kayu kelas III m3 0.003 4,500,000.00 13,500.00
Paku 5 cm – 12 cm kg 0.020 15,000.00 300.00
Minyak bekisting Liter 6,400.00 0.00
Besi beton polos kg 3.600 12,000.00 43,200.00
Kawat beton kg 0.050 22,000.00 1,100.00
Semen Portland kg 5.500 1,260.00 6,930.00
Pasir Beton m3 0.009 187,000.00 1,683.00
Kerikil m3 0.015 300,000.00 4,500.00
JUMLAH HARGA BAHAN 71,213.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.060 91,500.00 5,490.00
Tukang besi konstruksi L.02 OH 0.060 110,000.00 6,600.00
Kepala tukang L.03 OH 0.006 120,000.00 720.00
Mandor L.04 OH 0.003 130,000.00 390.00
JUMLAH TENAGA KERJA 13,200.00
B BAHAN
Besi Profil Kg 1.150 17,600.00 20,240.00
JUMLAH HARGA BAHAN 20,240.00
C PERALATAN
Sewa alat Jam 0.170 14,285.71 2,428.57
JUMLAH HARGA ALAT 2,428.57
A TENAGA
Pekerja L.01 OH 0.440 91,500.00 40,260.00
Tukang las L.02 OH 0.440 110,000.00 48,400.00
Kepala tukang L.03 OH 0.044 120,000.00 5,280.00
Mandor L.04 OH 0.022 130,000.00 2,860.00
JUMLAH TENAGA KERJA 96,800.00
B BAHAN
pintu lipat harmonika m2 1.000 #N/A #N/A
JUMLAH HARGA BAHAN #N/A
C PERALATAN
A TENAGA
Pekerja L.01 OH 1.000 91,500.00 91,500.00
Tukang las L.02 OH 1.000 110,000.00 110,000.00
Kepala tukang L.03 OH 0.100 120,000.00 12,000.00
Mandor L.04 OH 0.050 130,000.00 6,500.00
JUMLAH TENAGA KERJA 220,000.00
B BAHAN
Rolling Dor Aluminium m2 1.000 330,000.00 330,000.00
JUMLAH HARGA BAHAN 330,000.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.0430 91,500.00 3,934.50
Tukang alumunium L.02 OH 0.0430 110,000.00 4,730.00
Kepala tukang L.03 OH 0.0043 120,000.00 516.00
Mandor L.04 OH 0.0021 130,000.00 273.00
JUMLAH TENAGA KERJA 9,453.50
B BAHAN
Profil alluminium m 1.100 70,000.00 77,000.00
Skrup fixer buah 2.000 18,150.00 36,300.00
Sealant Tube 0.060 30,000.00 1,800.00
JUMLAH HARGA BAHAN 115,100.00
C PERALATAN
JUMLAH HARGA ALAT
A TENAGA
Pekerja L.01 OH 0.0430 91,500.00 3,934.50
Tukang alumunium L.02 OH 0.0430 110,000.00 4,730.00
Kepala tukang L.03 OH 0.0043 120,000.00 516.00
Mandor L.04 OH 0.0021 130,000.00 273.00
JUMLAH TENAGA KERJA 9,453.50
B BAHAN
Pipa GI Medium A Dia. 160 mm (6,29921 Inc) m 1.100 73,666.67 81,033.33
Kawat las btg 0.300 5,000.00 1,500.00
A TENAGA
Pekerja L.01 OH 0.0850 91,500.00 7,777.50
Tukang alumunium L.02 OH 0.0850 110,000.00 9,350.00
Kepala tukang L.03 OH 0.0090 120,000.00 1,080.00
Mandor L.04 OH 0.0050 130,000.00 650.00
JUMLAH TENAGA KERJA 18,857.50
B BAHAN
Spandrel Aluminium CA 10Cm x 0.8mm x 6M white lbr 1.667 151,000.00 251,666.67
JUMLAH HARGA BAHAN 251,666.67
C PERALATAN
A.4.2.1.20.a Pemasangan 1 m2 rangka Baja ringan canai dingin C75 modul 60x120 cm, untuk partisi
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.2500 91,500.00 22,875.00
Tukang besi L.02 OH 0.2500 110,000.00 27,500.00
Kepala tukang L.03 OH 0.0250 120,000.00 3,000.00
Mandor L.04 OH 0.0130 130,000.00 1,690.00
JUMLAH TENAGA KERJA 55,065.00
B BAHAN
Baja ringan canai dingin C75 m 3.100 14,000.00 43,400.00
Assesoris (perkuatan, las dll) Ls 100% x rangka 14,000.00 14,000.00
A.4.2.1.22. (K3) Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C75
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7340 91,500.00 67,161.00
Tukang besi L.02 OH 0.7340 110,000.00 80,740.00
Kepala tukang L.03 OH 0.0730 120,000.00 8,760.00
Mandor L.04 OH 0.0370 130,000.00 4,810.00
JUMLAH TENAGA KERJA 161,471.00
B BAHAN
Baja ringan canai dingin C75 m 3.065 15,000.00 45,975.00
Assesoris (perkuatan, las dll) Ls 100% x rangka 15,000.00 15,000.00
A.4.2.1.22.a Pemasangan 1 m2 rangka Baja ringan canai dingin C75 modul 60x120 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7340 91,500.00 67,161.00
Tukang besi L.02 OH 0.7340 110,000.00 80,740.00
Kepala tukang L.03 OH 0.0730 120,000.00 8,760.00
Mandor L.04 OH 0.0370 130,000.00 4,810.00
JUMLAH TENAGA KERJA 161,471.00
B BAHAN
Baja ringan canai dingin C75 m 4.692 14,000.00 65,687.06
Assesoris (perkuatan, las dll) Ls 100% x rangka 14,000.00 14,000.00
A TENAGA
Pekerja L.01 OH 0.7340 91,500.00 67,161.00
Tukang besi L.02 OH 0.7340 110,000.00 80,740.00
Kepala tukang L.03 OH 0.0730 120,000.00 8,760.00
Mandor L.04 OH 0.0370 130,000.00 4,810.00
JUMLAH TENAGA KERJA 161,471.00
B BAHAN
Besi Hollow Galvanis 40x60x1.2 mm m 1.192 38,833.33 46,274.74
Besi Hollow Galvanis 40x40x1 mm m 0.227 13,400.00 3,040.34
Kawat las Btg 0.500 12,000.00 6,000.00
A.4.2.1.22.d Pemasangan 1 m2 rangka Atap Besi Hollow Galvanis (dengan jarak langsiran 100m)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7340 91,500.00 67,161.00
Tukang besi L.02 OH 0.7340 110,000.00 80,740.00
Kepala tukang L.03 OH 0.0730 120,000.00 8,760.00
Mandor L.04 OH 0.0370 130,000.00 4,810.00
JUMLAH TENAGA KERJA 161,471.00
B BAHAN
Besi Hollow Galvanis 40x60x2 mm m 2.882 43,800.00 126,239.07
Kawat las Btg 1.400 12,000.00 16,800.00
Langsiran dengan Jarak 100 m (T.15.a.6) OH 1.000 58,800.00 58,800.00
A TENAGA
Pekerja L.01 OH 0.1835 91,500.00 16,790.25
Tukang besi L.02 OH 0.1835 110,000.00 20,185.00
Kepala tukang L.03 OH 0.0183 120,000.00 2,190.00
Mandor L.04 OH 0.0093 130,000.00 1,202.50
JUMLAH TENAGA KERJA 40,367.75
B BAHAN
Baja Ringan Reng 32.45 TASO m1 2.520 68,400.00 172,395.85
A TENAGA
Pekerja L.01 OH 0.1835 91,500.00 16,790.25
Tukang besi L.02 OH 0.1835 110,000.00 20,185.00
Kepala tukang L.03 OH 0.0183 120,000.00 2,190.00
Mandor L.04 OH 0.0093 130,000.00 1,202.50
JUMLAH TENAGA KERJA 40,367.75
B BAHAN
Baja Ringan Reng 32.45 TASO m1 2.717 68,400.00 185,830.58
JUMLAH HARGA BAHAN 185,830.58
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.1835 91,500.00 16,790.25
Tukang besi L.02 OH 0.1835 110,000.00 20,185.00
Kepala tukang L.03 OH 0.0183 120,000.00 2,190.00
Mandor L.04 OH 0.0093 130,000.00 1,202.50
JUMLAH TENAGA KERJA 40,367.75
B BAHAN
Pipa GI Medium A Dia. 20 mm (0,7874 Inc) m1 2.753 6,783.33 18,673.15
A.4.2.1.22.h (K3) Pemasangan 1 m2 reng besi holoow GI 40x60x1 mm, jarak reng ≤ 80 cm (dengan jarak langsiran 100m)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.1835 91,500.00 16,790.25
Tukang besi L.02 OH 0.1835 110,000.00 20,185.00
Kepala tukang L.03 OH 0.0183 120,000.00 2,190.00
Mandor L.04 OH 0.0093 130,000.00 1,202.50
JUMLAH TENAGA KERJA 40,367.75
B BAHAN
Baja Ringan Reng 32.45 TASO m1 1.391 7,600.00 10,574.21
Langsiran dengan Jarak 100 m (T.15.a.6) OH 1.000 58,800.00 58,800.00
JUMLAH HARGA BAHAN 69,374.21
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.7340 91,500.00 67,161.00
Tukang besi L.02 OH 0.7340 110,000.00 80,740.00
Kepala tukang L.03 OH 0.0730 120,000.00 8,760.00
Mandor L.04 OH 0.0370 130,000.00 4,810.00
JUMLAH TENAGA KERJA 161,471.00
B BAHAN
Plat Besi kg 0.382 200,000.00 76,388.89
Kawat las btg 0.800 12,000.00 9,600.00
Aksesoris 20 % dari bahan 0.200 200,000.00 40,000.00
A TENAGA
Pekerja L.01 OH 0.7340 91,500.00 67,161.00
Tukang besi L.02 OH 0.7340 110,000.00 80,740.00
Kepala tukang L.03 OH 0.0730 120,000.00 8,760.00
Mandor L.04 OH 0.0370 130,000.00 4,810.00
JUMLAH TENAGA KERJA 161,471.00
B BAHAN
Baja ringan canai dingin C75 kg 2.444 14,000.00 34,222.22
Assesoris (perkuatan, las dll) Ls 100% x rangka 14,000.00 14,000.00
JUMLAH HARGA BAHAN 48,222.22
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.3500 91,500.00 32,025.00
Tukang Besi L.02 OH 0.3500 110,000.00 38,500.00
Kepala tukang L.03 OH 0.0350 120,000.00 4,200.00
Mandor L.04 OH 0.0180 130,000.00 2,340.00
JUMLAH TENAGA KERJA 77,065.00
B BAHAN
Pipa GI Medium A Dia. 110 mm (4,33071 Inc) m1 1.174 49,166.67 57,709.08
Kawat las btg 0.500 12,000.00 6,000.00
A.4.2.1.21.c Pemasangan 1 m2 rangka besi hollow 1x40.40.0,4mm, modul 60 x 60 cm, untuk plafon
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3500 91,500.00 32,025.00
Tukang Besi L.02 OH 0.3500 110,000.00 38,500.00
Kepala tukang L.03 OH 0.0350 120,000.00 4,200.00
Mandor L.04 OH 0.0180 130,000.00 2,340.00
JUMLAH TENAGA KERJA 77,065.00
B BAHAN
Rangka metal hollow 40.40.0,4 mm m1 4.000 7,500.00 30,000.00
Assesoris (perkuatan, las dll) Ls 100% x rangka 7,500.00 7,500.00
Langsiran dengan Jarak 100 m (T.15.a.6) OH 1.000 58,800.00 58,800.00
JUMLAH HARGA BAHAN 96,300.00
C PERALATAN
JUMLAH HARGA ALAT
A TENAGA
Pekerja L.01 OH 0.8000 91,500.00 73,200.00
Tukang Besi L.02 OH 0.8000 110,000.00 88,000.00
Kepala tukang L.03 OH 0.0800 120,000.00 9,600.00
Mandor L.04 OH 0.0500 130,000.00 6,500.00
JUMLAH TENAGA KERJA 177,300.00
B BAHAN
Rangka metal hollow 40.40.0,4 mm m1 4.000 5,500.00 22,000.00
Assesoris (perkuatan, las dll) Ls 100% x rangka 5,500.00 5,500.00
A TENAGA
Pekerja L.01 OH 0.5700 91,500.00 52,155.00
Tukang Besi L.02 OH 0.7000 110,000.00 77,000.00
Kepala tukang L.03 OH 0.2000 120,000.00 24,000.00
Mandor L.04 OH 0.0800 130,000.00 10,400.00
JUMLAH TENAGA KERJA 163,555.00
B BAHAN
Pipa GI Medium A Dia. 63 mm (2,48031 Inc) m1 11.16 20,166.67 225,060.00
Pipa GI Medium A Dia. 110 mm (4,33071 Inc) m1 2.520 49,166.67 123,900.00
Besi Strip 30 x 3 mm kg 4.267 17,600.00 75,093.33
Decking Solid 290x15x2,5 Btg 4.780 456,000.00 2,179,680.00
Fischer+Screw bh 10.000 1,100.00 11,000.00
Kawat las btg 4.000 5,000.00 20,000.00
JUMLAH HARGA BAHAN 2,634,733.33
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.3000 91,500.00 27,450.00
Tukang Besi L.02 OH 0.2000 110,000.00 22,000.00
Kepala tukang L.03 OH 0.1000 120,000.00 12,000.00
Mandor L.04 OH 0.0800 130,000.00 10,400.00
JUMLAH TENAGA KERJA 71,850.00
B BAHAN
Pipa GI Medium A Dia. 160 mm (6,29921 Inc) m1 0.7 73,666.67 51,566.67
Besi Hollow Galvanis 40x40x1 mm m1 2.200 29,800.00 65,560.00
Decking Solid 290x15x2,5 Btg 1.115 456,000.00 508,572.24
Fischer+Screw bh 10.000 1,100.00 11,000.00
Kawat las btg 2.300 5,000.00 11,500.00
JUMLAH HARGA BAHAN 648,198.91
C PERALATAN
A. 4.4.1.8.a Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal tebal ½ batu campuran 1SP : 3PP
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.4000 91,500.00 36,600.00
Tukang batu L.02 OH 0.2000 110,000.00 22,000.00
Kepala tukang L.03 OH 0.0200 120,000.00 2,400.00
Mandor L.04 OH 0.0250 130,000.00 3,250.00
JUMLAH TENAGA KERJA 64,250.00
B BAHAN
Bata merah buah 70.0000 800.00 56,000.00
Semen Portland Kg 14.370 1,260.00 18,106.20
Pasir pasang m3 0.040 168,000.00 6,720.00
JUMLAH HARGA BAHAN 80,826.20
C PERALATAN
JUMLAH HARGA ALAT
Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal tebal ½ batu campuran 1SP :5PP
A. 4.4.1.10.a (dengan jarak langsiran 100m)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 91,500.00 27,450.00
Tukang batu L.02 OH 0.1000 110,000.00 11,000.00
Kepala tukang L.03 OH 0.0100 120,000.00 1,200.00
Mandor L.04 OH 0.0150 130,000.00 1,950.00
JUMLAH TENAGA KERJA 41,600.00
B BAHAN
Bata merah buah 70.0000 800.00 56,000.00
Semen Portland Kg 9.680 1,260.00 12,196.80
Pasir pasang m3 0.045 168,000.00 7,560.00
Langsiran dengan Jarak 100 m (T.15.a.6) OH 1.000 58,800.00 58,800.00
JUMLAH HARGA BAHAN 134,556.80
C PERALATAN
JUMLAH HARGA ALAT
A TENAGA
Pekerja L.01 OH 0.6000 91,500.00 54,900.00
Tukang batu L.02 OH 0.2000 110,000.00 22,000.00
Kepala tukang L.03 OH 0.0200 120,000.00 2,400.00
Mandor L.04 OH 0.0300 130,000.00 3,900.00
JUMLAH TENAGA KERJA 83,200.00
B BAHAN
Bata merah buah 140.0000 800.00 112,000.00
Semen Portland Kg 26.550 1,260.00 33,453.00
Pasir pasang m3 0.093 168,000.00 15,624.00
JUMLAH HARGA BAHAN 161,077.00
C PERALATAN
JUMLAH HARGA ALAT
A TENAGA
Pekerja L.01 OH 0.7000 91,500.00 64,050.00
Tukang batu L.02 OH 0.3500 110,000.00 38,500.00
Kepala tukang L.03 OH 0.0350 120,000.00 4,200.00
Mandor L.04 OH 0.0350 130,000.00 4,550.00
JUMLAH TENAGA KERJA 111,300.00
B BAHAN
Keramik ukuran 60cm x 60 cm KW I m2 1.050 110,000.00 115,500.00
Semen Portland Kg 8.190 1,260.00 10,319.40
Pasir pasang m3 0.045 168,000.00 7,560.00
Semen warna Kg 0.500 15,000.00 7,500.00
JUMLAH HARGA BAHAN 140,879.40
C PERALATAN
JUMLAH HARGA ALAT
A TENAGA
Pekerja L.01 OH 0.7000 91,500.00 64,050.00
Tukang batu L.02 OH 0.3500 110,000.00 38,500.00
Kepala tukang L.03 OH 0.0350 120,000.00 4,200.00
Mandor L.04 OH 0.0350 130,000.00 4,550.00
JUMLAH TENAGA KERJA 111,300.00
B BAHAN
Keramik motif kayu 60cm x 60 cm KW II m2 1.050 106,000.00 111,300.00
Semen Portland Kg 8.190 1,260.00 10,319.40
Pasir pasang m3 0.045 168,000.00 7,560.00
Semen warna Kg 0.500 15,000.00 7,500.00
JUMLAH HARGA BAHAN 136,679.40
C PERALATAN
JUMLAH HARGA ALAT
A TENAGA
Pekerja L.01 OH 0.7000 91,500.00 64,050.00
Tukang batu L.02 OH 0.3500 110,000.00 38,500.00
Kepala tukang L.03 OH 0.0350 120,000.00 4,200.00
Mandor L.04 OH 0.0350 130,000.00 4,550.00
JUMLAH TENAGA KERJA 111,300.00
B BAHAN
Keramik ukuran 25x25 cm m2 1.050 60,500.00 63,525.00
Semen Portland Kg 8.190 1,260.00 10,319.40
Pasir pasang m3 0.045 168,000.00 7,560.00
Semen warna Kg 0.500 15,000.00 7,500.00
Langsiran dengan Jarak 100 m (T.15.a.6) OH 1.000 58,800.00 58,800.00
JUMLAH HARGA BAHAN 88,904.40
C PERALATAN
JUMLAH HARGA ALAT
A TENAGA
Pekerja L.01 OH 0.7000 91,500.00 64,050.00
Tukang batu L.02 OH 0.3500 110,000.00 38,500.00
Kepala tukang L.03 OH 0.0350 120,000.00 4,200.00
Mandor L.04 OH 0.0350 130,000.00 4,550.00
JUMLAH TENAGA KERJA 111,300.00
B BAHAN
Batu Candi m2 1.050 159,500.00 167,475.00
Semen Portland Kg 8.190 1,260.00 10,319.40
Pasir pasang m3 0.045 168,000.00 7,560.00
Semen warna Kg 0.500 15,000.00 7,500.00
JUMLAH HARGA BAHAN 192,854.40
C PERALATAN
JUMLAH HARGA ALAT
A TENAGA
Pekerja L.01 OH 0.7000 91,500.00 64,050.00
Tukang batu L.02 OH 0.3500 110,000.00 38,500.00
Kepala tukang L.03 OH 0.0350 120,000.00 4,200.00
Mandor L.04 OH 0.0350 130,000.00 4,550.00
JUMLAH TENAGA KERJA 111,300.00
B BAHAN
Batu Templek m2 1.050 65,000.00 68,250.00
Semen Portland Kg 8.190 1,260.00 10,319.40
Pasir pasang m3 0.045 168,000.00 7,560.00
Semen warna Kg 0.500 15,000.00 7,500.00
JUMLAH HARGA BAHAN 93,629.40
C PERALATAN
JUMLAH HARGA ALAT
A TENAGA
Pekerja L.01 OH 0.7000 91,500.00 64,050.00
Tukang batu L.02 OH 0.3500 110,000.00 38,500.00
Kepala tukang L.03 OH 0.0350 120,000.00 4,200.00
Mandor L.04 OH 0.0350 130,000.00 4,550.00
JUMLAH TENAGA KERJA 111,300.00
B BAHAN
Paving Block Type Bata 20 x 10 cm Tebal 6 cm K200 m2 1.050 90,000.00 94,500.00
Pasir pasang m3 0.045 168,000.00 7,560.00
A TENAGA
Pekerja L.01 OH 0.9000 91,500.00 82,350.00
Tukang batu L.02 OH 0.4500 110,000.00 49,500.00
Kepala tukang L.03 OH 0.0450 120,000.00 5,400.00
Mandor L.04 OH 0.0450 130,000.00 5,850.00
JUMLAH TENAGA KERJA 143,100.00
B BAHAN
Bata Tempel m2 1.050 114,000.00 119,700.00
Semen Portland Kg 9.300 1,260.00 11,718.00
Pasir pasang m3 0.018 168,000.00 3,024.00
Semen warna Kg 0.500 15,000.00 7,500.00
JUMLAH HARGA BAHAN 141,942.00
C PERALATAN
A.4.4.3.50.b Pemasangan 1m2 dinding batu candi (dengan jarak langsiran 100m)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.9000 91,500.00 82,350.00
Tukang batu L.02 OH 0.4500 110,000.00 49,500.00
Kepala tukang L.03 OH 0.0450 120,000.00 5,400.00
Mandor L.04 OH 0.0450 130,000.00 5,850.00
JUMLAH TENAGA KERJA 143,100.00
B BAHAN
Batu Candi m2 1.050 159,500.00 167,475.00
Semen Portland Kg 9.300 1,260.00 11,718.00
Pasir pasang m3 0.018 168,000.00 3,024.00
Semen warna Kg 0.500 15,000.00 7,500.00
Langsiran dengan Jarak 100 m (T.15.a.6) OH 1.000 58,800.00 58,800.00
JUMLAH HARGA BAHAN 248,517.00
C PERALATAN
A.4.4.3.50.c Pemasangan 1m2 dinding keramik meja dapur 25 cm x 40 cm (dengan jarak langsiran 100m)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.9000 91,500.00 82,350.00
Tukang batu L.02 OH 0.4500 110,000.00 49,500.00
Kepala tukang L.03 OH 0.0450 120,000.00 5,400.00
Mandor L.04 OH 0.0450 130,000.00 5,850.00
JUMLAH TENAGA KERJA 143,100.00
B BAHAN
Keramik Dinding 25 x 40 cm m2 1.050 77,000.00 80,850.00
Semen Portland Kg 9.300 1,260.00 11,718.00
Pasir pasang m3 0.018 168,000.00 3,024.00
Semen warna Kg 0.500 15,000.00 7,500.00
Langsiran dengan Jarak 100 m (T.15.a.6) OH 1.000 58,800.00 58,800.00
JUMLAH HARGA BAHAN 161,892.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.100 91,500.00 9,150.00
Tukang kayu L.02 OH 0.200 110,000.00 22,000.00
Kepala tukang L.03 OH 0.020 120,000.00 2,400.00
Mandor L.04 OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 34,200.00
B BAHAN
Calsiplank m 1.050 17,500.00 18,375.00
Paku skrup Kg 0.050 11,000.00 550.00
Hollow 20.40.2 mm m 4.200 15,000.00 63,000.00
A TENAGA
Pekerja L.01 OH 0.2000 91,500.00 18,300.00
Tukang kayu L.02 OH 0.1000 110,000.00 11,000.00
Kepala tukang L.03 OH 0.0100 120,000.00 1,200.00
Mandor L.04 OH 0.0010 130,000.00 130.00
JUMLAH TENAGA KERJA 30,630.00
B BAHAN
Multipleks 12 mm Lembar 0.382 220,000.00 84,027.78
Paku anti karat bh 11.465 1,300.00 14,904.50
JUMLAH HARGA BAHAN 98,932.28
C PERALATAN
JUMLAH HARGA ALAT
A TENAGA
Pekerja L.01 OH 0.2000 91,500.00 18,300.00
Tukang kayu L.02 OH 0.3000 110,000.00 33,000.00
Kepala tukang L.03 OH 0.0030 120,000.00 360.00
Mandor L.04 OH 0.0100 130,000.00 1,300.00
JUMLAH TENAGA KERJA 52,960.00
B BAHAN
Atap Shing Bitumen - Bardoline Pack 0.344 642,750.00 221,106.00
Polywood 12 mm Lembar 0.347 220,000.00 76,340.00
Paku 1/2 " - 1 " Pcs 48.200 300.00 14,460.00
Screw Pcs 14.580 1,200.00 17,496.00
Underlayer - Ondutis bh 0.040 1,584,000.00 63,360.00
JUMLAH HARGA BAHAN 392,762.00
C PERALATAN
JUMLAH HARGA ALAT
A TENAGA
Pekerja L.01 OH 0.2000 91,500.00 18,300.00
Tukang kayu L.02 OH 0.1000 110,000.00 11,000.00
Kepala tukang L.03 OH 0.0100 120,000.00 1,200.00
Mandor L.04 OH 0.0100 130,000.00 1,300.00
JUMLAH TENAGA KERJA 31,800.00
B BAHAN
Atap Onduvilla Lembar 3.710 54,390.00 201,786.90
Paku dan Skrup bh 16.129 1,300.00 20,967.70
Langsiran dengan Jarak 100 m (T.15.a.6) OH 1.000 58,800.00 58,800.00
JUMLAH HARGA BAHAN 281,554.60
C PERALATAN
JUMLAH HARGA ALAT
A TENAGA
Pekerja L.01 OH 0.2000 91,500.00 18,300.00
Tukang kayu L.02 OH 0.1000 110,000.00 11,000.00
Kepala tukang L.03 OH 0.0100 120,000.00 1,200.00
Mandor L.04 OH 0.0010 130,000.00 130.00
JUMLAH TENAGA KERJA 30,630.00
B BAHAN
Nok / Ridge Onduline Lembar 1.474 90,000.00 132,660.00
Paku dan Skrup bh 10.256 1,300.00 13,332.80
JUMLAH HARGA BAHAN 145,992.80
C PERALATAN
JUMLAH HARGA ALAT
A TENAGA
Pekerja L.01 OH 6.000 91,500.00 549,000.00
Tukang kayu L.02 OH 18.000 110,000.00 1,980,000.00
Kepala tukang L.03 OH 1.800 120,000.00 216,000.00
Mandor L.04 OH 0.300 130,000.00 39,000.00
JUMLAH TENAGA KERJA 2,784,000.00
B BAHAN
Balok kayu kelas II m³ 1.200 7,000,000.00 8,400,000.00
Paku 12 cm kg 1.250 15,000.00 18,750.00
Lem kayu kg 1.000 25,000.00 25,000.00
A TENAGA
Pekerja L.01 OH 1.000 91,500.00 91,500.00
Tukang kayu L.02 OH 3.000 110,000.00 330,000.00
Kepala tukang L.03 OH 0.300 120,000.00 36,000.00
Mandor L.04 OH 0.050 130,000.00 6,500.00
JUMLAH TENAGA KERJA 464,000.00
B BAHAN
Papan kayu kelas II m³ 0.040 7,000,000.00 280,000.00
Lem kayu kg 0.500 25,000.00 12,500.00
A TENAGA
Pekerja L.01 OH 0.800 91,500.00 73,200.00
Tukang kayu L.02 OH 2.400 110,000.00 264,000.00
Kepala tukang L.03 OH 0.240 120,000.00 28,800.00
Mandor L.04 OH 0.040 130,000.00 5,200.00
JUMLAH TENAGA KERJA 371,200.00
B BAHAN
Papan kayu kelas II m³ 0.024 7,000,000.00 168,000.00
Lem kayu kg 0.300 25,000.00 7,500.00
A.4.6.1.8.a Pembuatan 1m2 daun pintu blockwood rangkap, lapis HPL dan aluminium foil
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.7000 91,500.00 64,050.00
Tukang kayu L.02 OH 2.1000 110,000.00 231,000.00
Kepala tukang L.03 OH 0.2100 120,000.00 25,200.00
Mandor L.04 OH 0.0350 130,000.00 4,550.00
JUMLAH TENAGA KERJA 324,800.00
B BAHAN
Blockwood Ukuran (90 x 220) cm Lembar 1.000 190,000.00 190,000.00
HPL m2 1.000 185,000.00 185,000.00
Aluminium foil m2 1.000 8,800.00 8,800.00
Paku 1 cm – 2,5 cm kg 0.030 15,000.00 450.00
Lem kayu Kg 0.500 25,000.00 12,500.00
A.4.7.1.10.b Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) - cat eksterior
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 91,500.00 1,830.00
Tukang cat L.02 OH 0.0630 110,000.00 6,930.00
Kepala tukang L.03 OH 0.0063 120,000.00 756.00
Mandor L.04 OH 0.0030 130,000.00 390.00
JUMLAH TENAGA KERJA 9,906.00
B BAHAN
Plamuur Kg 0.100 12,500.00 1,250.00
Cat dasar Cat Tembok Mutu Tinggi Kg 0.100 121,000.00 12,100.00
Cat Penutup Cat Tembok Mutu Tinggi Kg 0.260 121,000.00 31,460.00
JUMLAH HARGA BAHAN 44,810.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.0200 91,500.00 1,830.00
Tukang cat L.02 OH 0.0630 110,000.00 6,930.00
Kepala tukang L.03 OH 0.0063 120,000.00 756.00
Mandor L.04 OH 0.0030 130,000.00 390.00
JUMLAH TENAGA KERJA 9,906.00
B BAHAN
Pelapis Coating Batu Bata Kg 0.260 163,000.00 42,380.00
JUMLAH HARGA BAHAN 42,380.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 0.0200 91,500.00 1,830.00
Tukang cat L.02 OH 0.2000 110,000.00 22,000.00
Kepala tukang L.03 OH 0.0200 120,000.00 2,400.00
Mandor L.04 OH 0.0025 130,000.00 325.00
JUMLAH TENAGA KERJA 26,555.00
B BAHAN
Politur Kg 0.100 60,000.00 6,000.00
Kuas buah 0.010 16,500.00 165.00
JUMLAH HARGA BAHAN 6,165.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 1.200 91,500.00 109,800.00
Tukang batu L.02 OH 1.450 110,000.00 159,500.00
Kepala tukang L.03 OH 0.150 120,000.00 18,000.00
Mandor L.04 OH 0.060 130,000.00 7,800.00
JUMLAH TENAGA KERJA 295,100.00
B BAHAN
Bio Septic Tank 1000 L Unit 1.000 3,507,500.00 3,507,500.00
JUMLAH HARGA BAHAN 3,507,500.00
C PERALATAN
JUMLAH HARGA ALAT
A TENAGA
Pekerja L.01 OH 0.300 91,500.00 27,450.00
Tukang batu L.02 OH 0.450 110,000.00 49,500.00
Kepala tukang L.03 OH 0.045 120,000.00 5,400.00
Mandor L.04 OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 84,300.00
B BAHAN
Bak Fiberglass 0,30 M3 Unit 1.000 413,000.00 413,000.00
Perlengkapan LS 12% x bak 49,560.00 49,560.00
JUMLAH HARGA BAHAN 462,560.00
C PERALATAN
JUMLAH HARGA ALAT
A TENAGA
Pekerja L.01 OH 0.010 91,500.00 915.00
Tukang batu L.02 OH 0.100 110,000.00 11,000.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 13,765.00
B BAHAN
Floor drain M 1.000 45,000.00 45,000.00
A TENAGA
Pekerja L.01 OH 0.036 91,500.00 3,294.00
Tukang batu L.02 OH 0.060 110,000.00 6,600.00
Kepala tukang L.03 OH 0.006 120,000.00 720.00
Mandor L.04 OH 0.002 130,000.00 260.00
JUMLAH TENAGA KERJA 10,874.00
B BAHAN
Pipa PVC 1” M 1.200 6,600.00 7,920.00
Perlengkapan Ls 35% x pipa 6,600.00 2,310.00
JUMLAH HARGA BAHAN 10,230.00
C PERALATAN
A TENAGA
Tukang Listrik OH 0.100 110,000.00 11,000.00
Mandor OH 0.010 130,000.00 1,300.00
JUMLAH TENAGA KERJA 12,300.00
B BAHAN
Stop Kontak Stop kontak no.6600 m 1.000 23,000.00 23,000.00
A.8.4.6.1.f (K3) Pemasangan 1 buah Lampu Led Bulb 12 Watt Philips MyCare 12W Kuning
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Tukang Listrik OH 0.100 110,000.00 11,000.00
Mandor OH 0.010 130,000.00 1,300.00
JUMLAH TENAGA KERJA 12,300.00
B BAHAN
Lampu Led Bulb 12 Watt Philips MyCare 12W Kuning m 1.000 51,000.00 51,000.00
A TENAGA
Tukang Listrik OH 0.100 110,000.00 11,000.00
Mandor OH 0.010 130,000.00 1,300.00
JUMLAH TENAGA KERJA 12,300.00
B BAHAN
Lampu TL LED Tube 9 W m 1.000 35,000.00 35,000.00
A TENAGA
Tukang Listrik OH 0.100 110,000.00 11,000.00
Mandor OH 0.010 130,000.00 1,300.00
JUMLAH TENAGA KERJA 12,300.00
B BAHAN
Lampu Edison LED 4 Watt Bohlam Kuning m 1.000 34,800.00 34,800.00
A TENAGA
Tukang Listrik OH 0.100 110,000.00 11,000.00
Mandor OH 0.010 130,000.00 1,300.00
JUMLAH TENAGA KERJA 12,300.00
B BAHAN
Lampu DL LED Panel 12 W m 1.000 90,000.00 90,000.00
A TENAGA
Tukang Listrik OH 0.100 110,000.00 11,000.00
Mandor OH 0.010 130,000.00 1,300.00
JUMLAH TENAGA KERJA 12,300.00
B BAHAN
Box MCB m 1.000 17,000.00 17,000.00
MCB m 1.000 50,000.00 50,000.00
JUMLAH HARGA BAHAN 67,000.00
C PERALATAN
hari 0.010
JUMLAH HARGA ALAT 0.00
A TENAGA
Pekerja OH 0.050 91,500.00 4,575.00
Tukang Listrik OH 0.500 110,000.00 55,000.00
Mandor OH 0.050 130,000.00 6,500.00
JUMLAH TENAGA KERJA 61,500.00
B BAHAN
Instalasi Kabel NYM 4x6 mm2 m 1.100 65,000.00 71,500.00
A TENAGA
Pekerja OH 0.050 322,000.00 16,100.00
Tukang Listrik OH 0.500 110,000.00 55,000.00
Mandor OH 0.050 130,000.00 6,500.00
JUMLAH TENAGA KERJA 61,500.00
B BAHAN
Instalasi Kabel NYM 4x4 mm2 m 1.100 45,000.00 49,500.00
A TENAGA
Pekerja OH 0.050 140,000.00 7,000.00
Tukang Listrik OH 0.500 110,000.00 55,000.00
Mandor OH 0.050 130,000.00 6,500.00
JUMLAH TENAGA KERJA 61,500.00
B BAHAN
Kabel NYM 3 x 2,5 m 1.100 13,000.00 14,300.00
A TENAGA
Pekerja L.01 OH 6.0000 91,500.00 549,000.00
Tukang Listrik L.02 OH 3.0000 110,000.00 330,000.00
Kepala tukang L.03 OH 0.3000 120,000.00 36,000.00
JUMLAH TENAGA KERJA 915,000.00
B BAHAN
MCCB 3 Phasa 50 A bh 1.0000 900,000.00 900,000.00
MCCB 3 Phasa 25 A bh - 419,241.49 -
MCCB 1 Phasa 10 A bh 4.0000 120,000.00 480,000.00
Plat Tembaga yang sudah jadi set 1.0000 84,000.00 84,000.00
Sisir tembaga 3 ps bh 3.0000 58,000.00 174,000.00
Sisir tembaga 1 ps bh 3.0000 52,000.00 156,000.00
Rel MCB m 1.0000 38,000.00 38,000.00
Mur + Baut set 12.0000 6,000.00 72,000.00
Mata bor bh - 62,000.00 -
Kabel NYA 35mm2 m 3.0000 40,000.00 120,000.00
Skun kabel 35 mm bh 9.0000 18,000.00 162,000.00
Skun 2,5 mm2 bh 24.0000 6,200.00 148,800.00
CT Amp Meter bh - 110,000.00 -
Voltmeter bh 1.0000 173,000.00 173,000.00
Selector Switch bh 1.0000 114,000.00 114,000.00
Indicator Lamp bh 3.0000 52,000.00 156,000.00
Isolasi 3M bh 2.0000 24,000.00 48,000.00
kondom kabel RST bh 6.0000 13,000.00 78,000.00
Spiral Kabel m 4.0000 8,000.00 32,000.00
Kabel Ties 15 cm bh 12.0000 1,300.00 15,600.00
NYAF 2,5mm2 m 6.0000 2,500.00 15,000.00
Terminal Block bh 1.0000 45,000.00 45,000.00
Pipa PVC Ø 2" m` 6.0000 -
3,571,400.00
C PERALATAN
A TENAGA
Pekerja L.01 OH 3.0000 91,500.00 274,500.00
Tukang Listrik L.02 OH 1.5000 110,000.00 165,000.00
Kepala tukang L.03 OH 0.1500 120,000.00 18,000.00
JUMLAH TENAGA KERJA 457,500.00
B BAHAN
Box Panel uk. 30x40 cm Out door unit 1.0000 98,000.00 98,000.00
MCCB 3 Phasa 30 A bh - -
MCCB 3 Phasa 25 A bh 1.0000 419,241.49 419,241.49
MCB 6A bh 7.0000 21,000.00 147,000.00
Plat Tembaga yang sudah jadi set 2.0000 84,000.00 168,000.00
Sisir tembaga 3 ps bh 3.0000 58,000.00 174,000.00
Sisir tembaga 1 ps bh 3.0000 52,000.00 156,000.00
Rel MCB m 1.0000 38,000.00 38,000.00
Mur + Baut set 21.0000 6,000.00 126,000.00
Mata bor bh - 62,000.00 -
Kabel NYA 35mm2 m 3.0000 40,000.00 120,000.00
Skun kabel 35 mm bh 9.0000 18,000.00 162,000.00
Skun 2,5 mm2 bh 12.0000 6,200.00 74,400.00
CT Amp Meter bh - 110,000.00 -
Voltmeter bh - 173,000.00 -
Selector Switch bh - 114,000.00 -
Indicator Lamp bh 3.0000 52,000.00 156,000.00
Isolasi 3M bh 2.0000 24,000.00 48,000.00
kondom kabel RST bh 6.0000 13,000.00 78,000.00
Spiral Kabel m 4.0000 8,000.00 32,000.00
Kabel Ties 15 cm bh 12.0000 1,300.00 15,600.00
NYAF 2,5mm2 m 9.0000 2,500.00 22,500.00
Terminal Block bh 1.0000 45,000.00 45,000.00
Pipa PVC Ø 2" m` 6.0000 -
2,079,741.49
C PERALATAN
A TENAGA
Aplikator 20% Bahan OH 0.200 793,338.33 158,667.67
A TENAGA
Aplikator 20% Bahan OH 0.200 597,850.00 119,570.00
A TENAGA