D.3 LANTAI 3
III PEKERJAAN ELEKTRIKAL 8,000,000.00
E PEKERJAAN HALAMAN
E.1 PEKERJAAN DRAINASE 140,196,825.65
E.2 PEKERJAAN TALUD DAN LANTAI HALAMAN 205,235,352.94
E.3 PEKERJAAN TOWER 87,953,527.69
E.4 PEKERJAAN GROUNDTANG 103,652,528.23
F PEKERJAAN JALAN MASUK KELOKASI 148,602,762.00
JUMLAH 8,540,799,041.82
PPN 10% 854,079,904.18
TOTAL 9,394,878,946.00
PEMBULATAN 9,394,800,000.00
TERBILANG : Sembilan Milyar Tiga Ratus Sembilan Puluh Empat Juta Delapan Ratus Ribu Rupiah
HARGA SATUAN
NO. URAIAN PEKERJAAN KODE ANALISA VOLUME SAT. (Rp.) JUMLAH HARGA (Rp.)
I PEKERJAAN PERSIAPAN
1 Mobilisasi dan demobilisasi tenaga kerja dan peralatan Ls 1.00 Ls 8,000,000.00 8,000,000.00
2 Pembuatan Direksikeet A.2.2.1.5. 9.00 M2 1,199,891.00 10,799,019.00
3 Pembuatan gudang sementara A.2.2.1.7.A 18.00 M2 960,492.50 17,288,865.00
4 P3K Keselamatan kerja dan Protokol Covid-19 AN. K3 1.00 Ls 42,862,000.00 42,862,000.00
5 Pemasangan papan nama proyek Ls 1.00 Ls 500,000.00 500,000.00
6 Administrasi, pelaporan dan dokumentasi Ls 1.00 Ls 3,600,000.00 3,600,000.00
7 Test laboratorium Ls 1.00 Ls 4,000,000.00 4,000,000.00
8 Listrik kerja dan air bersih Ls 1.00 Ls 12,000,000.00 12,000,000.00
9 Pengukuran dan pemasangan bowplank A.2.2.1.4. 77.00 M' 62,546.00 4,816,042.00
Jumlah 103,865,926.00
A PEKERJAAN STRUKTUR LANTAI 1
II PEKERJAAN TANAH
1 Pek. Galian lubang pondasi sumuran A.2.3.1.1. 33.16 M3 60,500.00 2,006,180.00
2 Pek. Galian Pondasi foot plat A.2.3.1.2. 57.78 M3 74,250.00 4,290,165.00
3 Pek. Galian Pondasi batu belah menerus A.2.3.1.1. 87.14 M3 60,500.00 5,271,970.00
4 Pek. Urugan tanah kembali ex. Galian pondasi A.2.3.1.9. 36.23 M3 44,000.00 1,594,120.00
5 Pek. Timbunan tanah peninggian lantai A.2.3.1.10. 186.70 M3 44,000.00 8,214,800.00
Jumlah 21,377,235.00
III PEKERJAAN STRUKTUR
1 Pek. Pondasi Sumuran PS @ 11 Titik
a. Memasang serta membongkar bekisting A.4.1.1.20 138.16 M2 169,356.00 23,398,224.96
b. Pembesian dengan besi ulir A.4.1.1.17.u 1,169.35 Kg 15,378.00 17,982,264.30
c. Cor beton mutu K-250 A.4.1.1.8 27.63 M3 1,058,827.00 29,255,390.01
2 Pek. Pondasi Poer Plat @ 11 Bh
a. Urug pasir tebal 10 cm A.2.3.1.11. 1.86 M3 143,000.00 265,980.00
b. Lantai kerja beton K 175 tebal 5 cm A.4.1.1.5 0.93 M3 977,729.50 909,288.44
c. Memasang serta membongkar bekisting A.4.1.1.20 28.60 M2 169,356.00 4,843,581.60
d. Pembesian dengan besi ulir A.4.1.1.17.u 1,001.09 Kg 15,378.00 15,394,762.02
e Cor beton mutu K-250 A.4.1.1.8 9.30 M3 1,058,827.00 9,847,091.10
3 Pek. Pondasi Tapak P.4 @ 3 Bh
a. Urug pasir tebal 10 cm A.2.3.1.11. 0.70 M3 143,000.00 100,100.00
b. Lantai kerja beton K 175 tebal 5 cm A.4.1.1.5 0.35 M3 977,729.50 342,205.33
c. Memasang serta membongkar bekisting A.4.1.1.20 3.66 M2 169,356.00 619,842.96
d. Pembesian dengan besi ulir A.4.1.1.17.u 307.15 Kg 15,378.00 4,723,352.70
e Cor beton mutu K-250 A.4.1.1.8 1.91 M3 1,058,827.00 2,022,359.57
4 Pek. Pondasi Tapak P.5 @ 7 Bh
a. Urug pasir tebal 10 cm A.2.3.1.11. 0.70 M3 143,000.00 100,100.00
b. Lantai kerja beton K 175 tebal 5 cm A.4.1.1.5 0.35 M3 977,729.50 342,205.33
c. Memasang serta membongkar bekisting A.4.1.1.20 3.66 M2 169,356.00 619,842.96
d. Pembesian dengan besi ulir A.4.1.1.17.u 307.15 Kg 15,378.00 4,723,352.70
e Cor beton mutu K-250 A.4.1.1.8 1.91 M3 1,058,827.00 2,022,359.57
5 Pek. Pondasi Tapak/Pedestal P.6 @ 2 Bh
a. Urug pasir tebal 10 cm A.2.3.1.11. 1.01 M3 143,000.00 144,430.00
b. Lantai kerja beton K 175 tebal 5 cm A.4.1.1.5 0.51 M3 977,729.50 498,642.05
c. Memasang serta membongkar bekisting A.4.1.1.20 3.84 M2 169,356.00 650,327.04
d. Pembesian dengan besi ulir A.4.1.1.17.u 717.29 Kg 15,378.00 11,030,485.62
e. Pembesian dengan besi polos A.4.1.1.17 93.85 Kg 14,239.50 1,336,377.08
f. Cor beton mutu K-250 A.4.1.1.8 9.26 M3 1,058,827.00 9,804,738.02
6 Pek. Pondasi Pendestal K.1 Uk. 50/50 cm @ 11 Bh
a. Memasang serta membongkar bekisting A.4.1.1.22 18.70 M2 282,953.00 5,291,221.10
b. Pembesian dengan besi ulir A.4.1.1.17.u 981.20 Kg 15,378.00 15,088,893.60
c. Pembesian dengan besi polos A.4.1.1.17 135.74 Kg 14,239.50 1,932,869.73
d. Cor beton mutu K-250 A.4.1.1.8 2.34 M3 1,058,827.00 2,477,655.18
7 Pek. Pondasi Pendestal P.5 Uk. 25/40 cm @ 7 Bh
a. Memasang serta membongkar bekisting A.4.1.1.22 18.20 M2 282,953.00 5,149,744.60
b. Pembesian dengan besi ulir A.4.1.1.17.u 122.79 Kg 15,378.00 1,888,264.62
c. Pembesian dengan besi polos A.4.1.1.17 47.20 14,239.50 672,104.40
d. Cor beton mutu K-250 A.4.1.1.8 0.60 M3 1,058,827.00 635,296.20
8 Pek. Balok Sloof Beton S.1 Uk. 30/40 cm
a. Urug pasir tebal 5 cm A.2.3.1.11. 3.36 M3 143,000.00 480,480.00
b. Lantai kerja beton K 175 tebal 5 cm A.4.1.1.5 3.36 M3 977,729.50 3,285,171.12
c. Memasang serta membongkar bekisting A.4.1.1.21 100.80 M2 180,906.00 18,235,324.80
d. Pembesian dengan besi ulir A.4.1.1.17.u 3,371.76 Kg 15,378.00 51,850,925.28
e Pembesian dengan besi polos A.4.1.1.17 768.30 Kg 14,239.50 10,940,207.85
f Cor beton mutu K-250 A.4.1.1.8 20.16 M3 1,058,827.00 21,345,952.32
9 Pek. Balok Sloof Beton S.2 Uk. 15/20 cm
a. Memasang serta membongkar bekisting A.4.1.1.21 71.14 M2 180,906.00 12,869,652.84
b. Pembesian dengan besi ulir A.4.1.1.17.u 493.21 Kg 15,378.00 7,584,583.38
c. Pembesian dengan besi polos A.4.1.1.17 295.04 Kg 14,239.50 4,201,222.08
d. Cor beton mutu K-250 A.4.1.1.8 5.34 M3 1,058,827.00 5,654,136.18
10 Pek. Kolom beton K.1 Uk. 50/50 cm @ 11 Bh
a. Memasang serta membongkar bekisting A.4.1.1.22 110.00 M2 282,953.00 31,124,830.00
b. Pembesian dengan besi ulir A.4.1.1.17.u 2,354.88 Kg 15,378.00 36,213,344.64
c. Pembesian dengan besi polos A.4.1.1.17 556.53 Kg 14,239.50 7,924,708.94
d. Cor beton mutu K-250 A.4.1.1.8 13.75 M3 1,058,827.00 14,558,871.25
HARGA SATUAN
NO. URAIAN PEKERJAAN KODE ANALISA VOLUME SAT. (Rp.) JUMLAH HARGA (Rp.)
D.3 LANTAI 3
III PEKERJAAN ELEKTRIKAL
1 Panel Listrik uk. 40 x 60 x 20 cm (Lengkap + Instalasi) 15 Group 1.00 Unit Tidak dikerjakan
2 Pas. Lampu TL LED RAM 1 x 18 Watt Inbouw Louvre A.8.4.6.1.D 22.00 Unit Tidak dikerjakan
3 Pas. Lampu TL LED RAM 2 x 18 Watt Inbouw Louvre A.8.4.6.1.E 28.00 Unit Tidak dikerjakan
4 Pas. Lampu LED 8 Watt Downlight 3" A.8.4.6.1.F 18.00 Unit Tidak dikerjakan
5 Pas. Saklar tunggal A.8.4.6.1. 11.00 Bh Tidak dikerjakan
6 Pas. Saklar seri A.8.4.6.1.B 9.00 Bh Tidak dikerjakan
7 Pas. Saklar tripel A.8.4.6.1.C 4.00 Bh Tidak dikerjakan
8 Pas. Stop kontak A.8.4.6.1.A 13.00 Bh Tidak dikerjakan
9 Pas. Stop kontak AC A.8.4.6.2 9.00 Bh Tidak dikerjakan
10 Pas. Penangka petir 1.00 Unit 8,000,000.00 8,000,000.00
- Pas. Box groon lengkap = 1 Unit
- Pas. Stik tambak = 8 Bh
- Pas. Kabel BC dan perlengkpan lainnya
Jumlah 8,000,000.00
E PEKERJAAN HALAMAN
E.1 PEKERJAAN DRAINASE
1 Pek. Galian tanah A.2.3.1.1. 238.04 M3 60,500.00 14,401,420.00
2 Pek. Urugan tanah kembali ex. Galian A.2.3.1.9. 59.51 M3 44,000.00 2,618,440.00
3 Pek. Urugan pasir dibawah pasangan tb. 5 cm A.2.3.1.11. 10.70 M3 143,000.00 1,530,100.00
4 Pek. Pas. Pondasi batu belah hitam adk.1:4 A.3.2.1.2. 109.04 M3 697,180.00 76,020,507.20
5 Pek. Plesteran adk.1:4 A.4.4.2.4 438.99 M² 52,331.40 22,972,961.29
6 Pek. Acian A.4.4.2.27 438.99 M² 31,336.25 13,756,300.39
7 Pek. Plat
drainase,
- Begesting A.4.1.1.26 11.36 M² 365,233.00 4,149,046.88
Lebar 1,40
- Pembesian
m x Panjang A.4.1.1.17 208.52 Kg 14,239.50 2,969,220.54
10 m x tebal
- Beton mutu K225 A.4.1.1.8 1.68 M3 1,058,827.00 1,778,829.36
20 cm Jumlah 140,196,825.65
E.2 PEKERJAAN TALUD DAN LANTAI HALAMAN
1 Pek. Galian Tanah lahan A.2.3.1.1. 867.98 M3 60,500.00 52,512,790.00
2 Pek. Galian Pondasi batu belah menerus A.2.3.1.1. 45.24 M3 60,500.00 2,737,020.00
2 Pek. Urugan tanah kembali ex. Galian A.2.3.1.9. 11.31 M3 44,000.00 497,640.00
3 Pek. Urugan pasir dibawah pasangan tb. 5 cm A.2.3.1.11. 3.32 M3 143,000.00 474,760.00
4 Pek. Pas. Pondasi batu belah hitam adk.1:4 A.3.2.1.2. 115.44 M3 697,180.00 80,482,459.20
5 Pek. Plesteran adk.1:4 A.4.4.2.4 220.19 M² 52,331.40 11,522,850.97
6 Pek. Acian A.4.4.2.27 220.19 M² 31,336.25 6,899,928.89
7 Pek. Pas. Paving block tebal 6 cm A.4.4.3.64 127.62 M² 143,528.00 18,317,043.36
8 Pek. Pas. Lantai teras dan tangga batu andesit A.4.4.3.58 106.44 M² 272,676.25 29,023,660.05
9 Pek. Perbaikan paving block 8 cm, ganti yang pecah A.4.4.3.65 17.46 M² 158,488.00 2,767,200.48
Jumlah 205,235,352.94
E.3 PEKERJAAN TOWER
1 Pek. Pas. Pondasi Tower
- Pek.Galian tanah pondasi A.2.3.1.2. 3.94 M³ 74,250.00 292,545.00
- Pek.Urugan tanah kembali bekas galian A.2.3.1.9. 1.31 M³ 44,000.00 57,640.00
- Pek. Urugan pasir tb. 5 cm A.2.3.1.11. 0.28 M³ 143,000.00 40,040.00
- Pek. Lantai kerja tb. 3 cm, beton K100 A.4.1.1.4 0.13 M³ 801,773.50 104,230.56
- Pek. Lantai beton K175 adk.1:3:5 tb. 5 cm A.4.1.1.5 1.25 M³ 977,729.50 1,222,161.88
- Pek. Beton pondasi Footplat K 250
' - Begesting A.4.1.1.20 7.20 M² 169,356.00 1,219,363.20
' - Pembesian A.4.1.1.17.u 155.47 Kg 15,378.00 2,390,817.66
' - Beton mutu K250 A.4.1.1.8 0.93 M³ 1,058,827.00 984,709.11
- Pek. Beton Sloof 15/20 K250
' - Begesting A.4.1.1.21 6.60 M² 180,906.00 1,193,979.60
' - Pembesian A.4.1.1.17 73.55 Kg 14,239.50 1,047,315.23
' - Beton mutu K250 A.4.1.1.8 0.36 M³ 1,058,827.00 381,177.72
- Pas. Baut angkur Ø 19 mm - 450 16.00 Bh 35,000.00 560,000.00
2 Pel. Besi baja plat tapak tb. 10 mm A.4.2.1.2 12.52 Kg 48,774.00 610,650.48
3 Pek. Pas. Rangka besi siku Tower tinggi 8 m A.4.2.1.1 2,093.11 Unit 33,594.00 70,315,937.34
4 Pek. Pas. Tangki air Stainless Steel PS 3300 D, Profil Tank A.5.1.1 7. 1.00 Bh 3,507,295.00 3,507,295.00
5 Pas. Pelampung otamatis 1.00 Bh 35,000.00 35,000.00
6 Pek. Pengecatan Besi A.4.7.1.18 73.42 M² 52,701.00 3,869,307.42
7 Pas. Stop Kran Ø 1,75" A.5.1.1 19.a' 1.00 Bh 63,428.75 63,428.75
8 Pas. Stop Kran Ø 1" A.5.1.1 19.a 1.00 Bh 57,928.75 57,928.75
Jumlah 87,953,527.69
II PEKERJAAN PASANGAN
1 Pek. Pasangan Pondasi Batu Kali adk. 1:4 bawah ferocement A.3.2.1.2. 10.75 M³ 697,180.00 7,494,685.00
2 Pek. Pasangan Pondasi Batu Kali adk.1:4 bawah bata A.3.2.1.2. 2.07 M³ 697,180.00 1,443,162.60
3 Pek. Pasangan Batu Bata adk.1:4 A.4.4.1.9 16.96 M² 52,331.40 887,540.54
4 Pek. Pasangan Plesteran adk.1:4 A.4.4.2.4 22.46 M² 119,350.00 2,680,601.00
5 Pek. Acian A.4.4.2.27 22.46 M² 31,336.25 703,812.18
6 Pek. Ban Profil 34.87 M' 54,000.00 1,882,980.00
7 Pek. Pasangan Dinding Ferocement 1PC : 2 PS A.4.4.2.4.a 91.40 M² 450,387.30 41,165,399.22
8 Pek. Pasangan Rib Ferocement 1 PC : 2 PS A.4.4.2.4.b 21.76 M' 449,303.80 9,776,850.69
9 Pek. Pasangan Beton Tutup Man Hole 0.31 M³ 180,000.00 55,800.00
10 Pek. Pasang Tangga Pipa Besi Galvanis ø 1" 1.00 Unit 6,000,000.00 6,000,000.00
11 Pek. Pengecatan pembatas taman A.4.7.1.21.A 33.69 M² 15,290.00 515,120.10
Jumlah 72,605,951.33
III PEKERJAAN UTILITAS
1 Pompa air (Jet Pump) JP Basic 4 setara Grundfos 1.00 Unit 5,500,000.00 5,500,000.00
2 Pek. Instalasi Pipa Suplay, Distribusi, dan Over Flow 1.00 Unit 650,000.00 650,000.00
3 Pek. Pasang dudukan Pompa 1.00 Unit 350,000.00 350,000.00
4 Pek. Pasang Switch Otomatis (On/Off)+ kabel 1.00 Unit 200,000.00 200,000.00
Jumlah 6,700,000.00
Total 103,652,528.23
F PEKERJAAN JALAN MASUK KELOKASI
1 Pek. Bongkar paving block, akan dipasang kembali A.2.2.1.14.A 798.00 M² 11,011.00 8,786,778.00
2 Pek. Amapar batu subase tebal 10 cm A.2.3.1.14. 79.80 M³ 167,200.00 13,342,560.00
3 Pek. Pas. Kembali paving block lama A.4.4.3.65 638.40 158,488.00 101,178,739.20
4 Pek. Pas. Paving block tebal 8 cm ganti yang pecah A.4.4.3.65 159.60 M² 158,488.00 25,294,684.80
Jumlah 148,602,762.00
UPAH
1 Pekerja Oh 70,000.00
2 Tenaga gali tanah/pondasi Oh 45,000.00
3 Tukang Oh 80,000.00
4 Tukang batu Oh 80,000.00
5 Tukang kayu Oh 80,000.00
6 Tukang cat Oh 80,000.00
7 Tukang besi Oh 80,000.00
8 Tukang besi kontruksi Oh 80,000.00
9 Tukang politur Oh 80,000.00
10 Tukang Listrik Oh 80,000.00
11 Tukang Pipa ledeng Oh 80,000.00
12 Tukang las biasa Oh 80,000.00
13 Tukang las kontruksi Oh 80,000.00
14 Tukang khusus allmunium Oh 80,000.00
15 Tukang allmunium/kaca Oh 80,000.00
16 Tukang Taman Oh 80,000.00
17 Kepala tukang Oh 110,000.00
18 Kepala tukang batu Oh 110,000.00
19 Kepala tukang kayu Oh 110,000.00
20 Kepala tukang cat Oh 110,000.00
21 Kepala tukang besi Oh 110,000.00
22 Kepala tukang politur Oh 110,000.00
23 Mandor Oh 90,000.00
24 Tenaga Ahli Taman Oh 100,000.00
25 Instalatur Listrik Oh 120,000.00
26 Asisten Instalatur Listrik Oh 70,000.00
27 Operator Terlatih Oh 150,000.00
28 Pembantu Operator Oh 70,000.00
29 Pekerja Terampil Oh 100,000.00
30 Surveyor Geodesi Oh 110,000.00
31 Supir Terlatih Oh 90,000.00
32 Pembantu Supir Oh 60,000.00
BAHAN
1 Air Liter 150.00
2 Alumunium Composit Panel (ACP), tebal 4 mm m2 85,000.00 Lbr
3 Acrylic susu tebal 8 mm m2 150,000.00 Lbr
4 Acrylic susu tebal 5 mm m2 100,000.00 Lbr
5 Alat bantu / perlengkapan set 25,000.00
6 Amplas
Amplas besi lbr 7,000.00
Amplas kayu lbr 6,000.00
Amplas tembok m' 6,000.00
Asbes Gelombang 1.80 x 0.8 m x 3,5 mm lbr 125,000.00
Asbes Gelombang 1.80 x 1,05 m x 4 mm lbr 120,000.00
7 Asbes plat
GRC Board uk. 1200x2400x4 mm lbr 160,000.00
GRC board uk. 1200x2400x9 mm lbr 180,000.00
8 Bata
Bata merah bh 800.00
Batu bata bolong bh 2,500.00
Batako bh 2,300.00
9 Batu Belah
Batu belah hitam m3 140,000.00
Batu belah putih m3 160,000.00
Batu Candi m2 145,000.00
Batu Palimanan m2 165,000.00
NO. URAIAN SATUAN Harga Satuan KET
10 Batu Pecah
Batu Pecah 0,5 - 1 cm (Screening) m3 165,000.00
Batu Pecah 1 - 2 cm m3 160,000.00
Batu Pecah 2 - 3 cm m3 155,000.00
Batu Pecah 5 - 7 cm m3 145,000.00
Batu Pecah 7 - 10 cm m3 140,000.00
Batu Pecah 10 - 15 cm (onderlaagh) m3 138,000.00
Batu Pecah 15 - 20 cm m3 135,000.00
Batu split (maks 30 mm) m3 255,000.00
Kerikil m3 150,000.00
11 Baja dan Besi
Besi Siku Kg 6,000.00
Besi baja IWF kg 18,000.00
Besi beton polos kg 10,000.00
Besi beton ulir kg 11,000.00
Besi plat baja kg 20,000.00
Besi strip kg 14,000.00
Besi pipa kg 11,000.00
Hollow galvalume 4x4 mm btg 120,000.00
Hollow galvalume 2x4 mm btg 105,000.00
12 Baja Ringan setara Taso
Truss (C80) 1,00 mm m' 65,000.00 - Btg
Truss (C80) 0,75 mm m' 50,000.00 - Btg
Truss (C80) 0,758 mm m' 40,000.00 Btg
Truss (C80) 0,60 mm m' 32,000.00 Btg
Truss (C75) 0,75 mm Btg 35,000.00 - m'
Reng 150- R40.45 Btg 18,000.00 - m'
13 Bensin (Non Subsidi) ltr 10,000.00
14 Baut
Baut Hitam dia.16mm bh 18,000.00
Baut hitam dia.19mm bh 20,000.00
18 Cat
Cat alkali/dasar kg 30,000.00
Cat anti karat (galvanis) kg 33,000.00
Cat kayu kg 33,000.00
Cat meni kg 33,000.00
Cat besi kg 33,000.00
Cat tembok weather shield interior kg 40,000.00
Cat tembok weather shield exterior kg 40,000.00
Cat Taman kg 25,000.00
Cat waterproofing kg 42,000.00
Politur Ltr 15,000.00
Politur Jadi Ltr 20,000.00
16 Dempul tembok/ plamir (4kg) kg 13,000.00
17 Dempul kayu kg 13,000.00
18 Elektrikal
Pipa Listrik 5/8" Btg 4,000.00
Kabel m' 2,500.00
T Dus Bh 600.00
L Bow Bh 600.00
Las Dop Bh 600.00
Klem Bh 600.00
Mangkok Bh 600.00
Fitting Bh 600.00
Saklar Tunggal Bh 15,000.00
Saklar daubel Bh 25,000.00
Saklar triple Bh 35,000.00 -
Stop kontak Bh 15,000.00 -
Stop kontak AC Bh 17,000.00 -
Lampu TL. LED RAM 2 x 18 watt TKO prismatyc louver Bh 53,000.00 -
Lampu TL. LED RAM 1 x 18 watt TKO prismatyc louver Bh 42,000.00 -
Downlight Inbow 3" + Lampu LED 8 W Bh 40,000.00 -
Downlight Inbow 5" + Lampu LED 19 W Bh 50,000.00 -
Lampu SL 18 Watt Bh 42,000.00 -
Lampu LED 19 Watt Bh 48,000.00 -
Lampu LED 15 Watt Bh 45,000.00 -
Lampu LED 10 Watt Bh 20,000.00 -
19 Engsel pintu 4" bh 22,000.00 -
20 Engsel jendela 3" bh 20,000.00 -
21 Engsel angin jendela (cashement) bh 18,000.00 -
22 Filler kg 2,500.00 -
NO. URAIAN SATUAN Harga Satuan KET
23 Floor drain
Floor drain plastik bh 12,000.00 -
Floor drain Stainless bh 20,000.00 -
Floor Hardener MU-700 kg 35,000.00 -
24 Frame Jendela Alumunium
Jendela alluminium m' 48,000.00 -
Pintu Alumanium m' 67,000.00 -
Frame Jendela Alumunium Coklat 4'' Coating m' 110,000.00 -
Profil alluminium 4" m' 30,000.00 -
Alluminium strip m' 30,000.00 -
Hollow alumunium 40 mm x 40 mm m' 45,000.00 -
25 Folding Gate m2 850,000.00 -
26 Grendel -
Grendel pintu pendek bh 20,000.00 -
Grendel pintu panjang bh 25,000.00 -
Grendel pintu tanam bh 28,000.00 -
Grendel jendela bh 18,000.00 -
27 Genteng penutup -
genteng metal zincalume uk 0.8 x 1 lbr 56,000.00 -
genteng metal zincalume uk 0.8 x 1 berpasir lbr 65,000.00 -
genteng bitumen uk. (1.80 x 0.92 m) x 5 mm lbr 84,000.00 -
Genteng sirap Type Borneo uk. 700 x 50cm lbr 88,000.00 -
Atap UPVC Alderon Bergelombang RS Greca lite grey lbr 150,000.00 -
Uk.1,2 x 7600
Anderlayer x 2100
lebar 100 mm
cm m' 9,000.00 -
28 Genteng bubungan -
bubungan genteng metal zincalume Polos Besar bh 5,000.00 -
bubungan genteng metal zincalume berpasir bh 7,000.00 -
bubungan genteng metal zincalume Polos Kecil bh 8,000.00 -
nok Atap bitumen m' 50,000.00 -
Nok Alderon m' 65,000.00 -
29 Gypsum board 9mm lbr 140,000.00 -
30 GRC board 150,000.00
GRC Board tebal 4mm lbr 130,000.00
GRC Board tebal 6mm lbr 155,000.00
GRC Board tebal 9mm lbr 165,000.00
GRC Lisplang 20 cm m' 75,000.00
31 Handel pintu Set 160,000.00
32 Hak angin bh 18,000.00
33 Ijuk Ikat 35,000.00
34 Kabel m' 3,000.00
Kabel NYM 3 x 2,5 mm m' 4,500.00
Kabel NYM 3 x 1,5 mm m' 4,000.00
Kabel NYM 2 x 2,5 mm m' 3,800.00
Kabel NYM 2 x 1,5 mm m' 3,000.00
Kabel NYA 1,5 mm m' 2,800.00
Kabel NYA 2,5 mm m' 3,200.00
35 Kaca -
kaca film sandblas m2 -
kaca bening 3 mm m2 70,000.00
kaca bening 5 mm m2 90,000.00
kaca bening 8 mm m2 100,000.00
Kaca buram/es 3 mm m2 120,000.00
kaca reyband 8 mm m2 180,000.00
kaca reyband 5 mm m2 150,000.00
Kaca Tempered Tebal 12 mm m2 170,000.00
Kaca Tempered Tebal 10 mm m2 160,000.00
Kaca Tempered Tebal 8 mm m2 150,000.00
Jendela nako (rangka + kaca 5mm) m2 450,000.00
Profil Kaca m 20,000.00
36 Karpet talang lebar 55 cm m' -
37 Kayu begisting / racuk m3 2,100,000.00
38 Kayu dolken diameter 8-10/ 400cm batang 8,000.00
39 Kayu Kelas I -
Kayu papan kelas I m3 4,200,000.00
Kayu balok kelas I m3 4,200,000.00
40 Kayu kelas II -
Kayu papan kelas II m3 3,200,000.00
Kayu balok kelas II m3 3,200,000.00
Kayu Kelas II (2 x 3 cm) m3 3,200,000.00
Kayu Kelas II (3 x 4 cm) m3 3,200,000.00
Kayu Kelas II (5 x 7 cm) m3 3,200,000.00
41 Kayu Kelas III -
Kayu papan kelas III m3 2,000,000.00
Kayu balok kelas III m3 2,000,000.00
Kayu Kelas III (2 x 3 cm) m3 2,000,000.00
Kayu Kelas III (5 x 7 cm) m3 2,000,000.00
NO. URAIAN SATUAN Harga Satuan KET
SEWA ALAT
1 Beton molen unit/hari 170,000.00
2 Concrete Mixer 0.25 M3 Jam 30,000.00
3 Concrete Mixer 0.5 M3 Jam 30,000.00
4 Chainsaw Jam 15,000.00
5 Sewa mesin las Jam 15,000.00
6 Sewa Generator Jam 20,000.00
7 Sewa Mesin Bor Tanah Jam 50,000.00
8 Sewa Dump Truck 5 T Jam 150,000.00
9 Sewa Alat Water Pass/Theodolit Hari 150,000.00
10 Compressor Jam 100,000.00
11 Jack Hammer Jam 40,000.00
12 Wheel Loader Jam 200,000.00
NO. URAIAN SATUAN Harga Satuan KET
A.4.1.1.4 Membuat 1 m3 Lantai kerja mutu FC = 7,4 Mpa (K100), slump (3-6), c/w = 0,87
A.4.1.1.8 Membuat 1 m3 beton Mutu F'c = 21,7 Mpa (K250), Slump (12±2) mm, w/c = 0,56
`
A.4.2.1.2B Pemasangan 1 kg Pipa Baja
Harga Satuan Jumlah Harga
NO Uraian Kode Satuan Koefesian
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.060 70,000.00 4,200.00
Tukang L.02 OH 0.060 80,000.00 4,800.00
Kepala Tukang L.03 OH 0.006 110,000.00 660.00
Mandor L.04 OH 0.003 100,000.00 300.00
JUMLAH HARGA TENAGA 9,960.00
B BAHAN
Besi Pipa kg 1.150 11,000.00 12,650.00
- -
- -
- -
JUMLAH HARGA BAHAN 12,650.00
C PERALATAN -
-
JUMLAH HARGA PERALATAN
D Jumlah (A+B+C) 22,610.00
E Overhead & Profit 10% x D 2,261.00
F Harga Satuan Pekerjaan (D + E) 24,871.00
A.4.2.1.3 Pengerjaan 1 kg pekerjaan perakitan
A.4.2.1.5.a Pengerjaan 1 cm pengelasan dengan las listrik 15,048.00
39,919.00
A.4.2.1.21.A Pemasangan 1 m2 rangka galvalume Hollow 40.40 mm, modul 60 x60 cm, untuk plafon
A.4.2.1.22A (K3) Memasang 1 M2 angka Atap Baja Canal dengan Propil C75
A.4.4.1.9 Pemasangan 1m2 Dinding Bata merah (5x11x22) cm tebal 1/2 batu campuran 1 SP : 4 PP
Harga Satuan Jumlah Harga
NO Uraian Kode Satuan Koefesian
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 70,000.00 21,000.00
Tukang L.02 OH 0.100 80,000.00 8,000.00
Kepala Tukang L.03 OH 0.010 110,000.00 1,100.00
Mandor L.04 OH 0.015 100,000.00 1,500.00
JUMLAH HARGA TENAGA 31,600.00
B BAHAN
Batu Merah bh 70.000 800.00 56,000.00
Semen Portland kg 11.500 1,350.00 15,525.00
Pasir Pasang m3 0.043 125,000.00 5,375.00
JUMLAH HARGA BAHAN 76,900.00
C PERALATAN -
A.4.4.2.27A Pelapisan 1 m2 Water proofing Polymer Mortal Ex. SIKATOP 107 SEAL
Harga Satuan Jumlah Harga
NO Uraian Kode Satuan Koefesian
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 70,000.00 14,000.00
Tukang L.02 OH 0.100 80,000.00 8,000.00
Kepala Tukang L.03 OH 0.010 110,000.00 1,100.00
Mandor L.04 OH 0.010 100,000.00 1,000.00
JUMLAH HARGA TENAGA 24,100.00
B BAHAN
Cat Water profing kg 1.000 42,000.00 42,000.00
-
JUMLAH HARGA BAHAN 42,000.00
C PERALATAN -
A.4.5.2.11 Pemasangan 1 m2 atap UPVC Alderon Bergelombang RS Greca Life Grey Uk. 1,2 x 7600 x 210-0 mm
Harga Satuan Jumlah Harga
NO Uraian Kode Satuan Koefesian
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.140 70,000.00 9,800.00
Tukang L.02 OH 0.070 80,000.00 5,600.00
Kepala Tukang L.03 OH 0.007 110,000.00 770.00
Mandor L.04 OH 0.0070 100,000.00 700.00
JUMLAH HARGA TENAGA 16,870.00
B BAHAN
Atap UPVC Alderon Bergelombang RS Greca Life Grey Uk. Lbr 0.750 150,000.00 112,500.00
1,2 x 7600 x 2100 mm -
Paku Skrup kg 0.12 14,000.00 1,680.00
-
-
-
JUMLAH HARGA BAHAN 114,180.00
C PERALATAN -
-
JUMLAH HARGA BAHAN 66,420.00
C PERALATAN -
-
JUMLAH HARGA BAHAN 45,360.00
C PERALATAN -
-
JUMLAH HARGA BAHAN 56,700.00
C PERALATAN -
9,800.00
19,250.00
A.4.7.1.10. Pengecatan 1 m2 Tembok Baru (1 Lapis, 1 Lapis cat Dasar, 2 Lapis Cat penutup ixterior)
Harga Satuan Jumlah Harga
NO Uraian Kode Satuan Koefesian
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.020 70,000.00 1,400.00
Tukang L.02 OH 0.063 80,000.00 5,040.00
Kepala Tukang L.03 OH 0.006 110,000.00 693.00
Mandor L.04 OH 0.0030 100,000.00 300.00
JUMLAH HARGA TENAGA 7,433.00
B BAHAN
Plamur Tembok kg 0.100 25,000.00 2,500.00
Cat alkali dasar kg 0.100 30,000.00 3,000.00
cat Tembok weather sheld ixterior kg 0.260 40,000.00 10,400.00
-
Penyelesaian
1 Jadwal waktu pelaksanaan pelaksanaan di lapangan Kinerja Pelaksanaan Eksternal
Pekerjaan menjadi lamban
terhadap kontrak
Struktur Organisasi
2 Keselamatan Konstruksi Penambahan Personil Kinerja Pelaksanaan Internal
dalam pekerjaan
Harapan : Keinginan :
Stregth Daftar Peralatan - Tidak terjadi kecelakaan dan - Metoda kerja aman terhadap
penyakit akibat kerja Lingkungan
- Tidak terjadikecelakaan dan - Tidak tercemar lingkungan
penyakit akibat kerja
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA Pekerja Tukang kayu Kepala tukang Mandor L.01 OH OH OH 0,200 - -
L.02 OH 0,400 - -
L.03 0,020 - -
L.04 0,020 - -
JUMLAH HARGA -
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
B TENAGA + BAHAN A.4.2.1.11 m' m2 m2 8,660 - -
Pas. Kusen Profil alluminium 4 " Pas. Kaca polos tebal 5 mm A.4.6.2.17 Bh Bh Bh m2 0,686 - -
Pas. Daun pintu kayu kls.II , Lapis daubel teaxwood A.4.6.1.8 2,772 - -
Pas. Engsel Pintu Pas. Grendel tanam Pas. Kunci 2 slaag A.4.6.2.5 6,000 - -
Pek. Cat Politur daun pintu A.4.6.2.11.A 2,000 - -
A.4.6.2.2 1,000 - -
A.4.7.1.7 5,544 - -
JUMLAH HARGA -
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
B TENAGA + BAHAN A.4.2.1.11 m' m2 m2 7,160 - -
Pas. Kusen Profil alluminium 4 " Pas. Kaca polos tebal 5 mm A.4.6.2.17 Bh Bh m2 0,573 - -
Pas. Daun pintu kayu kls.II , Lapis daubel teaxwood A.4.6.1.8 1,722 - -
Pas. Engsel Pintu A.4.6.2.5 3,000 - -
Pas. Kunci 2 slaag A.4.6.2.2 1,000 - -
Pek. Cat Politur daun pintu A.4.7.1.7 3,444 - -
JUMLAH HARGA -
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
B TENAGA + BAHAN A.4.2.1.11 m' m2 m2 7,160 - -
Pas. Kusen Profil alluminium 4 " Pas. Kaca polos tebal 5 mm A.4.6.2.17 Bh Bh m2 0,437 - -
Pas. Daun pintu kayu kls.II , Lapis daubel teaxwood A.4.6.1.8 1,722 - -
Pas. Engsel Pintu A.4.6.2.5 3,000 - -
Pas. Kunci 2 slaag A.4.6.2.2 1,000 - -
Pek. Cat Politur daun pintu A.4.7.1.7 3,444 - -
JUMLAH HARGA -
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
B TENAGA + BAHAN A.4.2.1.11 m' m2 7,160 - -
Pas. Kusen Profil alluminium 4 " A.4.2.1.12 Bh 0,437 - -
Pas. Daun pintu daubel plat srip alumunium A.4.6.2.5 Bh 3,000 - -
Pas. Engsel Pintu A.4.6.2.3 1,000 - -
Pas. Kunci 1 slaag
JUMLAH HARGA -
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
B TENAGA + BAHAN A.4.2.1.11 m' m2 m2 9,020 - -
Pas. Kusen Profil alluminium 4 " Pas. Kaca polos tebal 5 mm A.4.6.2.17 Bh Bh Bh m2 1,052 - -
Pas. Daun pintu kayu kls.II , Lapis daubel teaxwood A.4.6.1.8 3,150 - -
Pas. Engsel Pintu Pas. Grendel tanam Pas. Kunci 2 slaag A.4.6.2.5 6,000 - -
Pek. Cat Politur daun pintu A.4.6.2.11.A 2,000 - -
A.4.6.2.2 1,000 - -
A.4.7.1.7 6,300 - -
JUMLAH HARGA -
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
B TENAGA + BAHAN A.4.2.1.11 m' m2 m2 m2 19,200 - -
Pas. Kusen Profil alluminium 4 " Pas. Kaca polos tebal 5 mm A.4.6.2.17 Bh Bh Bh Bh 3,950 - -
Pas. Daun pintu kayu kls.II , Lapis daubel teaxwood A.4.6.1.8 Bh Bh m2 1,890 - -
Pas. Daun jendela kaca alumunium A.4.6.1.8 1,216 - -
Pas. Engsel Pintu Pas. Kunci 2 slaag Pas. Engsel jendela A.4.6.2.5 3,000 - -
Pas. Hak angin jendela Pas. Tarikan jendela Pas. Gerendel jendela A.4.2.1.13.A 1,000 - -
Pek. Cat Politur daun pintu A.4.6.2.6 4,000 - -
A.4.6.2.9 4,000 - -
A.4.6.2.9.A 2,000 - -
A.4.6.2.9.A 4,000 - -
A.4.7.1.7 3,780 - -
JUMLAH HARGA -
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
B TENAGA + BAHAN A.4.2.1.11 m' m2 m2 18,800 - -
Pas. Kusen Profil alluminium 4 " Pas. Kaca polos tebal 5 mm A.4.6.2.17 Bh Bh m2 4,098 - -
Pas. Daun pintu kayu kls.II , Lapis daubel teaxwood A.4.6.1.8 1,890 - -
Pas. Engsel Pintu A.4.6.2.5 3,000 - -
Pas. Kunci 2 slaag A.4.2.1.13.A 1,000 - -
Pek. Cat Politur daun pintu A.4.7.1.7 3,780 - -
JUMLAH HARGA -
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
B TENAGA + BAHAN A.4.2.1.11 m' m2 m2 17,280 - -
Pas. Kusen Profil alluminium 4 " Pas. Kaca polos tebal 5 mm A.4.6.2.17 Bh Bh Bh m2 2,985 - -
Pas. Daun pintu kayu kls.II , Lapis daubel teaxwood A.4.6.1.8 3,150 - -
Pas. Engsel Pintu Pas. Kunci 2 slaag Pas. Grendel tanam A.4.6.2.5 6,000 - -
Pek. Cat Politur daun pintu A.4.2.1.13.A 1,000 - -
A.4.6.2.11.A 2,000 - -
A.4.7.1.7 6,300 - -
JUMLAH HARGA -
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
B TENAGA + BAHAN A.4.2.1.11 m' m2 m2 19,760 - -
Pas. Kusen Profil alluminium 4 " Pas. Kaca polos tebal 5 mm A.4.6.2.17 Bh Bh Bh Bh 4,822 - -
Pas. Daun jendela kaca alumunium A.4.6.1.8 2,432 - -
Pas. Engsel jendela Pas. Hak angin jendela Pas. Tarikan jendela A.4.6.2.6 8,000 - -
Pas. Gerendel jendela A.4.6.2.9 8,000 - -
A.4.6.2.9.A 4,000 - -
A.4.6.2.9.A 8,000 - -
JUMLAH HARGA -
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
B TENAGA + BAHAN A.4.2.1.11 m' m2 m2 16,820 - -
Pas. Kusen Profil alluminium 4 " Pas. Kaca polos tebal 5 mm A.4.6.2.17 Bh Bh Bh Bh 4,740 - -
Pas. Daun jendela kaca alumunium A.4.6.1.8 1,748 - -
Pas. Engsel jendela Pas. Hak angin jendela Pas. Tarikan jendela A.4.6.2.6 4,000 - -
Pas. Gerendel jendela A.4.6.2.9 4,000 - -
A.4.6.2.9.A 2,000 - -
A.4.6.2.9.A 4,000 - -
JUMLAH HARGA -
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
B TENAGA + BAHAN A.4.2.1.11 m' m2 m2 16,820 - -
Pas. Kusen Profil alluminium 4 " Pas. Kaca polos tebal 5 mm A.4.6.2.17 Bh Bh Bh Bh 4,740 - -
Pas. Daun jendela kaca alumunium A.4.6.1.8 1,748 - -
Pas. Engsel jendela Pas. Hak angin jendela Pas. Tarikan jendela A.4.6.2.6 4,000 - -
Pas. Gerendel jendela A.4.6.2.9 4,000 - -
A.4.6.2.9.A 2,000 - -
A.4.6.2.9.A 4,000 - -
JUMLAH HARGA -
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
B TENAGA + BAHAN A.4.2.1.11 m' m2 m2 12,620 - -
Pas. Kusen Profil alluminium 4 " Pas. Kaca polos tebal 5 mm A.4.6.2.17 Bh Bh Bh Bh 2,333 - -
Pas. Daun jendela kaca alumunium A.4.6.1.8 2,128 - -
Pas. Engsel jendela Pas. Hak angin jendela Pas. Tarikan jendela A.4.6.2.6 8,000 - -
Pas. Gerendel jendela A.4.6.2.9 8,000 - -
A.4.6.2.9.A 4,000 - -
A.4.6.2.9.A 8,000 - -
JUMLAH HARGA -
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
B TENAGA + BAHAN A.4.2.1.11 m' m2 11,160 - -
Pas. Kusen Profil alluminium 4 " Pas. Kaca polos tebal 5 mm A.4.6.2.17 3,380 - -
JUMLAH HARGA -
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
B TENAGA + BAHAN A.4.2.1.11 m' m2 10,640 - -
Pas. Kusen Profil alluminium 4 " Pas. Kaca polos tebal 5 mm A.4.6.2.17 3,214 - -
JUMLAH HARGA -
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
B TENAGA + BAHAN A.4.2.1.11 m' m2 9,120 - -
Pas. Kusen Profil alluminium 4 " Pas. Kaca polos tebal 5 mm A.4.6.2.17 2,591 - -
JUMLAH HARGA -
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
B TENAGA + BAHAN A.4.2.1.11 m' m2 2,920 - -
Pas. Kusen Profil alluminium 4 " Pas. Kaca polos tebal 5 mm A.4.6.2.17 0,426 - -
JUMLAH HARGA -
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
B TENAGA + BAHAN A.4.2.1.11 m' m2 2,900 - -
Pas. Kusen Profil alluminium 4 " Pas. Kaca polos tebal 5 mm A.4.6.2.17 0,421 - -
JUMLAH HARGA -
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
B TENAGA + BAHAN A.4.2.1.11 m' m2 4,780 - -
Pas. Kusen Profil alluminium 4 " Pas. Kaca polos tebal 5 mm A.4.6.2.17 0,749 - -
JUMLAH HARGA -
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
B TENAGA + BAHAN A.4.2.1.11 m' m2 2,720 - -
Pas. Kusen Profil alluminium 4 " Pas. Kaca polos tebal 5 mm A.4.6.2.17 0,374 - -
JUMLAH HARGA -
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
B TENAGA + BAHAN A.4.2.1.11 m' m2 4,440 - -
Pas. Kusen Profil alluminium 4 " A.4.2.1.12 Bh 0,952 - -
Pas. Daun pintu daubel plat srip alumunium A.4.6.2.5 Bh 2,000 - -
Pas. Engsel Pintu A.4.6.2.9.A 2,000 - -
Pas. Gerendel jendela
JUMLAH HARGA -
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
B TENAGA + BAHAN A.4.2.1.2.B Kg Kg m2 21,262 - -
Pas. Bingkai besi hollow 40 x 60 x tebal 1,4 mm Pas. Kisi-kisi besi A.4.2.1.2.B 15,598 - -
hollow 20 x 30 x tebal 1 mm Pas. Pengecatan besi A.4.6.2.5 5,957 - -
JUMLAH HARGA -
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA Pekerja L.01 OH OH OH 0,2000 - -
Tukang khusus allmunium L.02 OH 0,6000 - -
Kepala tukang L.03 0,1200 - -
Mandor L.04 0,0120 - -
D Jumlah (A+B+C) -
E Overhead & Profit - -
F Harga Satuan Pekerjaan (D+E) -
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA
Pekerja Tukang batu Kepala tukang Mandor L.01 OH 0,0960 - -
L.03 OH 0,1600 - -
L.03 OH 0,0070 - -
L.04 OH 0,0016 - -
JUMLAH TENAGA KERJA -
B BAHAN
Semen Portland Kg 2,9475 - -
PP M³ 0,0068 - -
Besi Beton Polos Kg 1,9800 - -
Las Listrik CM 26,0000 - -
Kawat Burung F M' 0,5100 - -
JUMLAH HARGA BAHAN -
C PERALATAN
D Jumlah (A+B+C) -
E Overhead & Profit - -
F Harga Satuan Pekerjaan (D+E) -
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
A TENAGA Pekerja Tukang batu Kepala tukang Mandor L.01 OH OH OH 0,240 - -
L.02 OH 0,120 - -
L.03 0,012 - -
L.04 0,012 - -
Stop kontak AC
JUMLAH HARGA BAHAN -
C PERALATAN
Fitting
JUMLAH HARGA BAHAN -
C PERALATAN
Fitting
JUMLAH HARGA BAHAN -
C PERALATAN