REKAPITULASI EE

PEKERJAAN : PENGADAAN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN GEDUNG BALAI NIKAH DAN MANASIK HAJI KUA JETIS, VOLUME 1 PAKET
LOKASI : Jl. Cokrokusuman Baru JT II No.786, Cokrodiningratan, Kec. Jetis, Kota Yogyakarta, Daerah Istimewa Yogyakarta
TAHUN ANGGARAN : 2024

NO URAIAN JUMLAH

A PEKERJAAN AWAL
I PEKERJAAN PERSIAPAN 7,876,383.75
II MANAGEMEN KESELAMATAN DAN KESEHATAN KERJA 13,844,250.00

B PEKERJAAN STRUKTUR
I PEKERJAAN TANAH 14,225,825.82
II PEKERJAAN STRUKTUR BAWAH 93,495,884.29
III PEKERJAAN STRUKTUR ATAS 282,625,909.37

C PEKERJAAN ARSITEKTUR LANTAI I


I PEKERJAAN TANAH DAN PASIR 7,800,213.31
II PEKERJAAN PASANGAN 81,559,951.76
III PEKERJAAN LANTAI 37,432,262.53
IV PEKERJAAN PINTU JENDELA 27,897,876.24
V PEKERJAAN PLAFOND 32,295,248.12
VI PEKERJAAN PENGECATAN 17,155,827.66

D PEKERJAAN ARSITEKTUR LANTAI II


I PEKERJAAN PASANGAN 98,467,374.76
II PEKERJAAN LANTAI 26,954,659.84
III PEKERJAAN PINTU JENDELA 22,234,260.00
IV PEKERJAAN PLAFOND 33,370,640.78
V PEKERJAAN PENGECATAN 22,142,616.94
VI PEKERJAAN ATAP 62,466,445.43

E PEKERJAAN LAIN - LAIN


I PEKERJAAN RAILING TANGGA, HAND RAILING DAN PENUNJANG DISABILITAS 6,342,480.90
II PEKERJAAN INTERIOR 18,563,443.13
III PEKERJAAN SANITASI, SANITER DAN AIR BERSIH 12,876,124.00
IV PEKERJAAN FASAD 34,342,610.48

PEKERJAAN MEKANIKAL & ELEKTRIKAL


F PEKERJAAN INSTALASI AIR BERSIH 13,721,163.40
G PEKERJAAN AIR BEKAS, AIR KOTOR, SALURAN AIR HUJAN 30,619,499.96
H PEKERJAAN PENYEDIAAN JARINGAN & DISTRIBUSI LISTRIK 28,765,678.20
I PEKERJAAN INSTALASI PENERANGAN & KOTAK KONTAK 28,853,979.00
J PEKERJAAN INSTALASI TATA UDARA 5,026,797.33
K PEKERJAAN INSTALASI SISTEM DATA / LAN
L PEKERJAAN INSTALASI TATA SUARA
M PEKERJAAN INSTALASI CCTV Err:509
N PEKERJAAN PROTEKSI KEBAKARAN 2,100,000.00
O PEKERJAAN INSTALASI PENYALUR PETIR 12,960,000.00

JUMLAH NOMINAL Err:509


PPN 11% Err:509
JUMLAH TOTAL Err:509
DIBULATKAN Err:509

Yogyakarta, 31 Januari 2024


Dibuat Oleh:
KONSULTAN PERENCANA
PT. WASTU ANOPAMA

Imawan Wibisana, S.T., M.T


Direktur
ESTIMATED ENGINEER ( EE )

PEKERJAAN : PENGADAAN JASA KONSULTANSI PERENCANAAN PEMBANGUNAN GEDUNG BALAI NIKAH DAN MANASIK HAJI KUA JETIS, VOLUME 1 PAKET
LOKASI : Jl. Cokrokusuman Baru JT II No.786, Cokrodiningratan, Kec. Jetis, Kota Yogyakarta, Daerah Istimewa Yogyakarta
T.A : 2024

NO MACAM PEKERJAAN VOLUME KODE AHSP HARGA SAT JUMLAH HARGA

A. PEKERJAAN AWAL
I PEKERJAAN PERSIAPAN
1 Papan Nama Proyek 1.00 unit Rp. 205,451.00 Rp. 205,451.00
2 Pembersihan Lokasi (Awal Sampai Akhir) 1.00 Is Rp. 3,000,000.00 Rp. 3,000,000.00
3 Uitset Bouplank 1.00 ls Rp. 2,500,000.00 Rp. 2,500,000.00
4 Pagar Pengaman Proyek Tinggi 2 Meter 7.35 m1 U.1.1.2 (c) Rp. 295,365.00 Rp. 2,170,932.75

SUB TOTAL Rp. 7,876,383.75


II MANAGEMEN KESELAMATAN DAN KESEHATAN KERJA
1 BPJS Ketenaga Kerjaan 1.00 ls Rp. 5,000,000.00 Rp. 5,000,000.00
2 Pengelolaan Biaya SMK3, meliputi :
a. Penyiapan RK3K terdiri atas :
- Pembuatan manual, instruksi kerja, prosedur, ijin kerja 3.00 set Rp. 250,000.00 Rp. 750,000.00
- Pembuatan Kartu Identitas Pekerja 5.00 bh Rp. 10,000.00 Rp. 50,000.00
b. Sosialisasi, promosi dan pelatihan, terdiri atas :
- Pertemuan mengenai keselamatan (Safety Meeting) 1.00 ls Rp. 750,000.00 Rp. 750,000.00
c. Sewa Alat Pelindung Kerja dan Alat Pelindung Diri terdiri atas :
- Topi Pelindung ( Safety Helmet ) 5.00 bh Rp. 60,850.00 Rp. 304,250.00
- Sarung tangan ( Safety Gloves ) 10.00 ps Rp. 30,000.00 Rp. 300,000.00
- Sepatu Keselamatan ( Safety Shoes ) 10.00 ps Rp. 225,000.00 Rp. 2,250,000.00
- Rompi Keselamatan ( Safety Vest ) 5.00 bh Rp. 50,000.00 Rp. 250,000.00
- Safety Harness 5.00 unit Rp. 128,000.00 Rp. 640,000.00
- Jaring Pengaman 1.00 ls Rp. 1,000,000.00 Rp. 1,000,000.00
d. Fasilitas Sarana kesehatan terdiri atas :
- Peralatan P3K ( Kotak P3K, Obat Luka, Perban ) 1.00 unit Rp. 750,000.00 Rp. 750,000.00
e. Rambu- Rambu terdiri atas :
- Rambu Petunjuk 3.00 bh Rp. 200,000.00 Rp. 600,000.00
- Rambu Peringatan 3.00 bh Rp. 200,000.00 Rp. 600,000.00
- Rambu pekerjaan Sementara 3.00 bh Rp. 200,000.00 Rp. 600,000.00

SUB TOTAL Rp. 13,844,250.00


B. PEKERJAAN STRUKTUR
I PEKERJAAN TANAH
1 Galian Tanah 109.15 m3 U.3.4.1.a.5 (c) Rp. 71,725.00 Rp. 7,828,812.44
2 Urugan Kembali 58.39 m3 U.3.5.1.a (c) Rp. 75,130.00 Rp. 4,386,898.40
3 Urugan Pasir t:5cm 6.41 m3 1.7.2.d (c) Rp. 313,478.00 Rp. 2,010,114.98

SUB TOTAL Rp. 14,225,825.82


II PEKERJAAN STRUKTUR BAWAH
1 Lantai Kerja t:5cm 3.21 m3 2.2.1.1.b.(c) Rp. 890,170.00 Rp. 2,854,018.55
2 Footplat FP1 - 1250 x 1250 x 400 mm
Siklop Beton K-250 60% - 40% Batu Belah 7.50 m3 Rp. 557,020.20 Rp. 4,177,651.50
Beton Footplate FP1 K-275 5.00 m3 A.4.1.1.9. Rp. 901,175.00 Rp. 4,505,875.00
Pembesian S 16 Bawah 354.67 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 4,980,232.88
Pembesian S 13 Atas 233.33 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 3,276,469.00
Bekisting Batako Footplat 16.00 m2 Rp. 109,756.00 Rp. 1,756,096.00
3 Footplat FP2 - 1000 x 1000 x 400 mm
Siklop Beton K-250 60% - 40% Batu Belah 1.20 m3 Rp. 557,020.20 Rp. 668,424.24
Beton Footplate FP1 K-275 0.80 m3 Rp. 901,175.00 Rp. 720,940.00
Pembesian S 13 Atas 37.50 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 526,575.38
Pembesian S 13 Bawah 37.50 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 526,575.38
Bekisting Batako Footplat 3.20 m2 Rp. 109,756.00 Rp. 351,219.20
4 Footplat FP3 Tangga - 1000 x 1200 x 400
Beton K-275 0.48 m3 Rp. 901,175.00 Rp. 432,564.00
Pembesian S 13 Pokok Atas 40.42 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 567,531.24
Pembesian S 13 Pokok Bawah 40.42 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 567,531.24
Bekisting Batako Footplat 1.92 m2 Rp. 109,756.00 Rp. 210,731.52
5 Pondasi Batu Kali 1 Pc : 4 Ps 20.24 m3 Rp. 792,108.00 Rp. 16,035,434.35
6 Tie Beam TB1 - 250x400
Beton K-275 4.66 m3 Rp. 901,175.00 Rp. 4,201,277.85
Pembesian S 16 Pokok 659.17 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 9,256,118.54
Pembesian S 13 Pinggang 107.17 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 1,504,851.35
Pembesian S 10 Sengkang 251.15 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 3,526,596.52
Bekisting + Bongkar 39.07 m2 A.4.1.1.19 Rp. 167,912.00 Rp. 6,560,657.66
7 Tie Beam TB2 - 200x350
Beton K-275 0.66 m3 Rp. 901,175.00 Rp. 598,019.73
Pembesian S 13 Pokok 75.50 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 1,060,171.76
Pembesian S 10 Pinggang 14.16 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 198,816.14
Pembesian S 10 Sengkang 39.37 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 552,805.85
Bekisting + Bongkar 6.64 m2 A.4.1.1.19 Rp. 167,912.00 Rp. 1,114,264.03
8 Sloof Praktis Sp 44.21 m1 Rp. 98,965.00 Rp. 4,375,242.65
9 Kolom Pedestal K1 - 400x450
Beton K-275 2.30 m3 Rp. 901,175.00 Rp. 2,076,307.20
Pembesian S 16 Pokok 525.92 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 7,384,973.90
Pembesian S 10 Sengkang 142.08 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 1,995,088.78
Bekisting + Bongkar 21.76 m2 A.4.1.1.20. Rp. 159,092.00 Rp. 3,461,841.92

742376487.xlsx Page 2
10 Kolom Pedestal K2 - 200x600
Beton K-275 0.38 m3 Rp. 901,175.00 Rp. 346,051.20
Pembesian S 16 Pokok 131.48 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 1,846,243.47
Pembesian S 10 Sengkang 33.05 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 464,135.24
Bekisting + Bongkar 5.12 m2 A.4.1.1.20. Rp. 159,092.00 Rp. 814,551.04

SUB TOTAL Rp. 93,495,884.29


III PEKERJAAN STRUKTUR ATAS
a. Lantai 1
1 Kolom K1 - 400x450
Beton K-275 5.11 m3 Rp. 901,175.00 Rp. 4,606,806.60
Pembesian S 16 Pokok 761.52 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 10,693,271.46
Pembesian S 10 Sengkang 234.43 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 3,291,896.49
Bekisting + Bongkar 48.28 m2 A.4.1.1.20. Rp. 159,092.00 Rp. 7,680,961.76
2 Kolom K2 - 200x600
Beton K-275 0.85 m3 Rp. 901,175.00 Rp. 767,801.10
Pembesian S 16 Pokok 190.38 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 2,673,317.86
Pembesian S 10 Sengkang 54.54 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 765,823.14
Bekisting + Bongkar 11.36 m2 A.4.1.1.20. Rp. 159,092.00 Rp. 1,807,285.12
3 Kolom K4 - 150x300
Beton K-275 0.32 m3 Rp. 901,175.00 Rp. 287,925.41
Pembesian P 12 Pokok 79.50 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 1,116,339.80
Pembesian S 10 Sengkang 26.05 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 365,766.28
Bekisting + Bongkar 6.39 m2 A.4.1.1.20. Rp. 159,092.00 Rp. 1,016,597.88
4 Kolom Praktis 71.00 m1 Rp. 77,152.00 Rp. 5,477,792.00
5 Angkur Kolom Praktis Besi P 8 28.05 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 393,808.17
6 Balok B1 - 250x600 SFL +3.550 v
Beton K-275 4.20 m3 Rp. 901,175.00 Rp. 3,784,935.00
Pembesian S 16 Pokok 467.65 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 6,566,792.78
Pembesian S 13 Pinggang 121.87 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 1,711,252.95
Pembesian S 10 Sengkang 198.91 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 2,793,124.29
Bekisting + Bongkar 40.60 m2 A.4.1.1.21. Rp. 162,260.00 Rp. 6,587,756.00
7 Balok B2 - 200x450 SFL +3.550
Beton K-275 3.20 m3 Rp. 901,175.00 Rp. 2,887,364.70
Pembesian S 13 Pokok 322.38 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 4,526,831.98
Pembesian S 10 Pinggang 46.83 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 657,640.38
Pembesian S 10 Sengkang 182.78 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 2,566,598.59
Bekisting + Bongkar 39.16 m2 A.4.1.1.21. Rp. 162,260.00 Rp. 6,354,101.60
8 Balok B3 - 200x350 SFL +3.550
Beton K-275 1.09 m3 Rp. 901,175.00 Rp. 977,774.88
Pembesian S 13 Pokok 134.37 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 1,886,778.08
Pembesian S 10 Pinggang 19.71 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 276,749.29
Pembesian S 10 Sengkang 64.23 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 901,946.39
Bekisting + Bongkar 13.95 m2 A.4.1.1.21. Rp. 162,260.00 Rp. 2,263,527.00
9 Balok B4 - 200x300 SFL +3.550
Beton K-275 1.88 m3 Rp. 901,175.00 Rp. 1,689,703.13
Pembesian S 13 Pokok 278.62 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 3,912,338.02
Pembesian S 10 Pinggang 40.61 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 570,297.51
Pembesian S 10 Sengkang 114.08 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 1,601,959.31
Bekisting + Bongkar 25.00 m2 A.4.1.1.21. Rp. 162,260.00 Rp. 4,056,500.00
10 Balok B5 - 200x250 SFL +3.550
Beton K-275 0.33 m3 Rp. 901,175.00 Rp. 297,387.75
Pembesian S 13 Pokok 53.93 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 757,215.39
Pembesian S 10 Sengkang 20.92 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 293,721.40
Bekisting + Bongkar 4.62 m2 A.4.1.1.21. Rp. 162,260.00 Rp. 749,641.20
11 Balok BT - 150x300 Bordes
Beton K-275 0.07 m3 Rp. 901,175.00 Rp. 62,856.96
Pembesian P 12 Pokok 11.32 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 159,015.46
Pembesian S 10 Pinggang 2.50 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 35,156.51
Pembesian S 10 Sengkang 5.13 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 72,044.87
Bekisting + Bongkar 1.16 m2 A.4.1.1.21. Rp. 162,260.00 Rp. 188,627.25
12 Balok Lateu 150x150 36.07 m1 Rp. 98,965.00 Rp. 3,569,667.55
13 Plat Lantai PL1, t:12cm SFL +3.550
Beton K-275 11.93 m3 Rp. 901,175.00 Rp. 10,750,513.09
Pembesian S 10 Pokok 1,494.32 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 20,983,253.89
Bekisting + Bongkar 99.41 m2 A.4.1.1.22. Rp. 203,092.00 Rp. 20,189,781.90
14 Plat Atap Canopy PL2, t:10cm SFL +3.550
Beton K-275 1.10 m3 Rp. 901,175.00 Rp. 991,292.50
Pembesian S 8 Pokok 116.08 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 1,629,959.08
Bekisting + Bongkar 11.00 m2 A.4.1.1.22. Rp. 203,092.00 Rp. 2,234,012.00
15 Plat Topi-topi PL3, t:10cm
Beton K-175 1.25 m3 Rp. 966,351.00 Rp. 1,211,417.61
Pembesian S 8 Pokok 74.28 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 1,042,981.53
Bekisting + Bongkar 15.67 m2 A.4.1.1.22. Rp. 135,394.67 Rp. 2,121,634.43
16 Plat Bordes, t:15cm
Beton K-275 0.22 m3 Rp. 966,351.00 Rp. 208,731.82
Pembesian S 10 Pokok 28.42 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 399,017.76
Bekisting + Bongkar 1.44 m2 A.4.1.1.22. Rp. 203,092.00 Rp. 292,452.48
17 Tangga, t:15cm
Beton K-275 1.95 m3 Rp. 966,351.00 Rp. 1,880,325.78
Pembesian P 12 Pokok 76.77 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 1,078,054.04
Pembesian S 10 Pokok 326.78 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 4,588,704.20
Bekisting + Bongkar 12.97 m2 Rp. 150,099.50 Rp. 1,947,090.71

742376487.xlsx Page 3
b. Lantai 2
1 Kolom K2 - 200x600
Beton K-275 0.85 m3 Rp. 901,175.00 Rp. 767,801.10
Pembesian S 16 Pokok 173.33 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 2,433,937.12
Pembesian S 10 Sengkang 54.54 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 765,823.14
Bekisting + Bongkar 11.36 m2 A.4.1.1.20. Rp. 159,092.00 Rp. 1,807,285.12
2 Kolom K3 - 150x400
Beton K-275 1.70 m3 Rp. 901,175.00 Rp. 1,535,602.20
Pembesian S 13 Pokok 297.74 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 4,180,805.05
Pembesian S 10 Sengkang 136.75 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 1,920,272.95
Bekisting + Bongkar 31.24 m2 A.4.1.1.20. Rp. 159,092.00 Rp. 4,970,034.08
3 Kolom Praktis 79.81 m1 Rp. 77,152.00 Rp. 6,157,501.12
4 Angkur Kolom Praktis Besi P 8 26.64 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 374,117.76
5 Balok B2 - 200x450 SFL +7.200
Beton K-275 0.47 m3 Rp. 901,175.00 Rp. 421,749.90
Pembesian S 13 Pokok 53.73 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 754,524.00
Pembesian S 10 Pinggang 7.60 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 106,681.83
Pembesian S 10 Sengkang 26.94 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 378,235.58
Bekisting + Bongkar 5.72 m2 A.4.1.1.21. Rp. 162,260.00 Rp. 928,127.20
6 Balok B4 - 200x300 SFL +7.200
Beton K-275 0.26 m3 Rp. 901,175.00 Rp. 231,421.74
Pembesian S 13 Pokok 46.07 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 646,868.59
Pembesian S 10 Pinggang 6.46 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 90,748.83
Pembesian S 10 Sengkang 15.97 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 224,274.30
Bekisting + Bongkar 3.42 m2 A.4.1.1.21. Rp. 162,260.00 Rp. 555,578.24
7 Balok B6 - 150x300 Miring SFL +7.150 s/d +9.950
Beton K-275 0.77 m3 Rp. 901,175.00 Rp. 697,509.45
Pembesian S 13 Pokok 128.30 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 1,801,651.10
Pembesian S 10 Pinggang 24.37 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 342,201.16
Pembesian S 10 Sengkang 54.46 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 764,784.03
Bekisting + Bongkar 12.90 m2 A.4.1.1.21. Rp. 162,260.00 Rp. 2,093,154.00
8 Balok B6 - 150x300 SFL +7.200
Beton K-275 2.32 m3 Rp. 901,175.00 Rp. 2,090,500.71
Pembesian S 13 Pokok 342.99 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 4,816,295.12
Pembesian S 10 Pinggang 66.73 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 937,090.92
Pembesian S 10 Sengkang 163.00 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 2,288,810.18
Bekisting + Bongkar 38.66 m2 A.4.1.1.21. Rp. 162,260.00 Rp. 6,273,377.25
9 Balok B6 - 150x300 SFL +9.950
Beton K-275 0.10 m3 Rp. 901,175.00 Rp. 86,783.15
Pembesian S 13 Pokok 34.18 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 479,946.91
Pembesian S 10 Pinggang 5.80 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 81,384.87
Pembesian S 10 Sengkang 7.10 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 99,754.44
Bekisting + Bongkar 1.61 m2 A.4.1.1.21. Rp. 162,260.00 Rp. 260,427.30
10 Balok B7 - 150x200 SFL +7.200
Beton K-275 3.56 m3 Rp. 901,175.00 Rp. 3,208,543.47
Pembesian P 10 Pokok 198.58 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 2,788,531.99
Pembesian P 8 Sengkang 160.02 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 2,247,036.14
Bekisting + Bongkar 59.34 m2 A.4.1.1.21. Rp. 162,260.00 Rp. 9,628,508.40
11 Balok Ringbalk (RB) 150x200 SFL +7.700 37.00 m1 Rp. 98,965.00 Rp. 3,661,705.00
12 Balok Lateu 150x150 43.32 m1 Rp. 98,965.00 Rp. 4,287,163.80
13 Plat Talang Beton & Tandon Air PL3, t:10cm SFL +7.200
Beton K-275 4.60 m3 Rp. 901,175.00 Rp. 4,141,079.36
Pembesian S 10 Pokok 272.27 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 3,823,156.28
Bekisting + Bongkar 57.44 m2 A.4.1.1.22. Rp. 203,092.00 Rp. 11,665,604.48
14 Plat Miring PL2, t:10cm SFL +7.150 s/d +9.950
Beton K-275 1.86 m3 Rp. 901,175.00 Rp. 1,673,950.59
Pembesian S 8 Pokok 176.09 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 2,472,698.21
Bekisting + Bongkar 18.58 m2 A.4.1.1.22. Rp. 203,092.00 Rp. 3,772,474.52
15 Plat Topi-topi PL3, t:10cm
Beton K-175 0.47 m3 Rp. 966,351.00 Rp. 453,025.35
Pembesian S 8 Pokok 27.78 kg 2.2.6.1.b.(c) Rp. 14,042.01 Rp. 390,036.49
Bekisting + Bongkar 5.86 m2 A.4.1.1.22. Rp. 135,394.67 Rp. 793,412.75

SUB TOTAL Rp. 282,625,909.37


C. PEKERJAAN ARSITEKTUR LANTAI I
I PEKERJAAN TANAH DAN PASIR
1 Urug Pasir Bawah Lantai, Tebal 5 cm 7.63 m3 1.7.2.d (c) Rp. 313,478.00 Rp. 2,391,641.22
2 Pemadatan Tanah Sisa Galian Untuk Peninggian Elevasi 44.33 m3 1.7.14.c (a) Rp. 54,664.00 Rp. 2,423,240.47
3 Peninggian Elevasi dengan Urugan Tanah Mendatangkan 16.71 m3 Rp. 178,706.00 Rp. 2,985,331.62

SUB TOTAL Rp. 7,800,213.31


II PEKERJAAN PASANGAN
1 Pasangan Dinding Bata Ringan 188.51 m2 A.4.4.1.26. Rp. 164,913.00 Rp. 31,087,584.72
2 Pekerjaan Plesteran Dengan Mortar Siap Pakai 512.12 m2 Rp. 59,495.00 Rp. 30,468,341.42
3 Pekerjaan Acian Dengan Mortar Siap Pakai 526.74 m2 Rp. 26,834.00 Rp. 14,134,487.49
4 Pekerjaan Skoning dengan Mortar Siap Pakai 172.73 m1 Rp. 33,981.00 Rp. 5,869,538.13

SUB TOTAL Rp. 81,559,951.76

742376487.xlsx Page 4
III PEKERJAAN LANTAI
1 Rabat Beton Bawah Lantai K-200, Tebal 8cm 4.46 m3 Rp. 906,367.00 Rp. 4,041,998.02
2 Rabat Beton Ramp Difabel K-175, Tebal 8cm 0.77 m3 2.2.2.1.f.(c) Rp. 966,351.00 Rp. 747,414.52
3 Pekerjaan Lantai Vinyl Lt.1 v
- Pekerjaan Acian 55.74 m2 Rp. 26,834.00 Rp. 1,495,847.91
- Pasang Lantai Vinyl uk. 15cm x 80cm t ; 5mm 55.74 m2 Rp. 265,668.00 Rp. 14,809,529.83
4 Pasang Lantai Keramik 60cm x 60cm Polished 10.08 m2 Rp. 207,697.00 Rp. 2,092,671.89
5 Pasang Lantai Keramik 60cm x 60cm Unpolished 22.82 m2 Rp. 217,861.00 Rp. 4,971,696.95
6 Pasang Lantai Keramik Tangga 60cm x 60cm Unpolished 13.38 m2 Rp. 217,861.00 Rp. 2,914,980.18
7 Pasang Lantai Keramik Tile 40cm x 40cm Anti selip, Kamar Mandi 5.52 m2 Rp. 181,561.00 Rp. 1,002,216.72
8 Pasang Keramik Dinding 20cm x 40cm Polished, Kamar Mandi 19.92 m2 Rp. 161,668.00 Rp. 3,221,073.23
9 Pasang Listello keramik 10cm x 20 cm, kamar Mandi 11.72 m1 Rp. 43,424.00 Rp. 508,929.28
10 Pasang Stepnoshing Tangga Sampai Lt 2 24.00 m1 Rp. 67,746.00 Rp. 1,625,904.00
v
SUB TOTAL Rp. 37,432,262.53
IV PEKERJAAN PINTU JENDELA
1 Pasang P1 Pintu Utama (Lengkap dengan aksesoris, handle, dll) 1.00 unit Rp. 11,391,945.00 Rp. 11,391,945.00
2 Pasang P2 Pintu Ruang Balai Nikah & Manasik Haji (Lengkap dengan aksesoris, handle, dll) 1.00 unit Rp. 1,422,271.00 Rp. 1,422,271.00
3 Pasang P3 Pintu Ruangan (Lengkap dengan aksesoris, handle, dll) 4.00 unit Rp. 1,187,170.00 Rp. 4,748,680.00
4 Pasang P4 Pintu Ruang Laktasi (Lengkap dengan aksesoris, handle, dll) 1.00 unit Rp. 576,497.00 Rp. 576,497.00
5 Pasang P5 Pintu Kamar Mandi (Lengkap dengan aksesoris, handle, dll) 2.00 unit Rp. 1,054,393.00 Rp. 2,108,786.00
6 Pasang P6 Pintu Shaft (Lengkap dengan aksesoris, handle, dll) 1.00 unit Rp. 537,393.00 Rp. 537,393.00
7 Pasang J1 (Lengkap dengan aksesoris, handle, dll) 3.00 unit Rp. 1,498,253.00 Rp. 4,494,759.00
8 Pasang J2 (Lengkap dengan aksesoris, handle, dll) 2.00 unit Rp. 725,208.00 Rp. 1,450,416.00
9 Pasang BV (Lengkap dengan aksesoris, handle, dll) 3.00 unit Rp. 366,479.00 Rp. 1,099,437.00
10 Pasang Roster Beton + Finishing Cat 0.12 m2 Rp. 564,102.00 Rp. 67,692.24

SUB TOTAL Rp. 27,897,876.24


V PEKERJAAN PLAFOND
1 Pasang Plafond PVC + Rangka Hollow 105.42 m2 Rp. 234,536.00 Rp. 24,724,269.14
2 Pasang Upceiling Plafond PVC + Rangka Hollow 30.18 m1 Rp. 176,737.00 Rp. 5,333,922.66
3 Pasang List Tepi Plafond PVC 73.51 m1 Rp. 30,432.00 Rp. 2,237,056.32

SUB TOTAL Rp. 32,295,248.12


VI PEKERJAAN PENGECATAN
1 Cat Dinding Interior 250.21 m2 3.3.10.(c) Rp. 26,355.00 Rp. 6,594,205.48
2 Cat Dinding Exterior Type "Weathershield" 166.53 m2 3.3.10.(c) Rp. 63,183.00 Rp. 10,521,555.39
3 Cat Coumpound Bawah Tangga (Ruang Laktasi) 2.24 m2 Rp. 17,871.00 Rp. 40,066.78

SUB TOTAL Rp. 17,155,827.66


D. PEKERJAAN ARSITEKTUR LANTAI II
I PEKERJAAN PASANGAN
1 Pasangan Dinding Bata Ringan 206.16 m2 A.4.4.1.26. Rp. 164,913.00 Rp. 33,999,123.73
2 Pekerjaan Plesteran Mortar Siap Pakai 497.41 m2 Rp. 59,495.00 Rp. 29,593,526.94
3 Pekerjaan Acian Mortar Siap Pakai 516.93 m2 Rp. 26,834.00 Rp. 13,871,406.96
4 Pekerjaan Skoning Mortar Siap Pakai 179.38 m1 Rp. 33,981.00 Rp. 6,095,511.78
5 Pasang Dinding Partisi Gypsum 2 sisi + Rangka Kayu dan Finishing Cat, PT 1 4.50 m2 Rp. 238,303.00 Rp. 1,072,363.50
6 Pasang Dinding Partisi Gypsum 2 sisi + Rangka Kayu dan Finishing Cat, PT 2 6.00 m2 Rp. 238,303.00 Rp. 1,429,818.00
7 Pasang Dinding Partisi Gypsum 2 sisi + Rangka Kayu dan Finishing Cat, PT 3 11.01 m2 Rp. 263,603.00 Rp. 2,902,269.03
8 Pasang Dinding Partisi Gypsum 2 sisi + Rangka Kayu dan Finishing Cat, PT 4 17.10 m2 Rp. 238,303.00 Rp. 4,074,981.30
9 Pasang Dinding Partisi Gypsum 2 sisi + Rangka Kayu dan Finishing Cat, PT 5 15.27 m2 Rp. 263,603.00 Rp. 4,025,217.81
10 Pasang Kaca Es PT1, tebal 5 mm (Lengkap Dengan Perkuatan dan aksesoris) 0.45 m2 Rp. 345,690.00 Rp. 155,560.50
11 Pasang Kaca Es PT2, tebal 5 mm (Lengkap Dengan Perkuatan dan aksesoris) 0.60 m2 Rp. 345,690.00 Rp. 207,414.00
12 Pasang Kaca Es PT3, tebal 5 mm (Lengkap Dengan Perkuatan dan aksesoris) 0.86 m2 Rp. 345,690.00 Rp. 298,676.16
13 Pasang Kaca Es PT4, tebal 5 mm (Lengkap Dengan Perkuatan dan aksesoris) 0.86 m2 Rp. 345,690.00 Rp. 295,564.95
14 Pasang Kaca Es PT5, tebal 5 mm (Lengkap Dengan Perkuatan dan aksesoris) 1.29 m2 Rp. 345,690.00 Rp. 445,940.10

SUB TOTAL Rp. 98,467,374.76


II PEKERJAAN LANTAI
1 Pasang Lantai Keramik 60cm x 60cm Polished 94.20 m2 Rp. 207,697.00 Rp. 19,564,039.68
2 Pasang Lantai Keramik Tile 40cm x 40cm Anti selip, Kamar Mandi 3.84 m2 Rp. 181,561.00 Rp. 697,194.24
3 Pasang Keramik Dinding 20cm x 40cm Polished, Kamar Mandi 16.35 m2 Rp. 161,668.00 Rp. 2,643,918.47
4 Pasang Plint Keramik 10cm x 60cm 53.18 m1 Rp. 68,292.00 Rp. 3,631,768.56
5 Pasang Listello keramik 10cm x 20 cm, kamar Mandi 9.62 m1 Rp. 43,424.00 Rp. 417,738.88

SUB TOTAL Rp. 26,954,659.84


III PEKERJAAN PINTU JENDELA
1 Pasang P3 Pintu Ruangan (Lengkap dengan aksesoris, handle, dll) 2.00 unit Rp. 1,187,170.00 Rp. 2,374,340.00
2 Pasang P5 Pintu Kamar Mandi (Lengkap dengan aksesoris, handle, dll) 2.00 unit Rp. 1,054,393.00 Rp. 2,108,786.00
3 Pasang P6 Pintu Shaft (Lengkap dengan aksesoris, handle, dll) 1.00 unit Rp. 537,393.00 Rp. 537,393.00
4 Pasang J1 (Lengkap dengan aksesoris, handle, dll) 11.00 unit Rp. 1,498,253.00 Rp. 16,480,783.00
5 Pasang BV (Lengkap dengan aksesoris, handle, dll) 2.00 unit Rp. 366,479.00 Rp. 732,958.00

SUB TOTAL Rp. 22,234,260.00


IV PEKERJAAN PLAFOND
1 Pasang Plafond PVC + Rangka Hollow 105.65 m2 Rp. 234,536.00 Rp. 24,778,658.04
2 Pasang List Tepi Plafond PVC 90.83 m1 Rp. 30,432.00 Rp. 2,764,138.56
3 Plafond GRC Tritisan + Rangka Hollow 35.73 m2 Rp. 163,117.00 Rp. 5,827,844.18

SUB TOTAL Rp. 33,370,640.78

742376487.xlsx Page 5
V PEKERJAAN PENGECATAN
1 Cat Dinding Interior 219.99 m2 3.3.10.(c) Rp. 26,355.00 Rp. 5,797,941.87
2 Cat Dinding Exterior Type "Weathershield" 176.02 m2 3.3.10.(c) Rp. 63,183.00 Rp. 11,121,446.39
3 Cat Listplank 6.63 m2 Rp. 53,515.00 Rp. 354,804.45
4 Cat Plafond GRC 35.73 m2 Rp. 26,684.00 Rp. 953,365.95
5 Waterproofing Lantai Kamar Mandi 3.84 m2 Rp. 61,670.00 Rp. 236,812.80
6 Waterproofing Dak Canopy dan Talang Beton 59.64 m2 Rp. 61,670.00 Rp. 3,678,245.48

SUB TOTAL Rp. 22,142,616.94


VI PEKERJAAN ATAP
1 Pasang Rangka Atap Baja Ringan 117.87 m2 Rp. 299,601.00 Rp. 35,313,071.07
2 Pasang Penutup Genteng Utama genteng beton 117.87 m2 Rp. 176,203.00 Rp. 20,768,519.00
3 Pasang Bubungan Genteng Beton 23.76 m1 Rp. 140,621.00 Rp. 3,341,154.96
4 Pasang Listplank 44.20 m1 Rp. 68,862.00 Rp. 3,043,700.40

SUB TOTAL Rp. 62,466,445.43


E. PEKERJAAN LAIN - LAIN
I PEKERJAAN RAILING TANGGA, HAND RAILING DAN PENUNJANG DISABILITAS
1 Hand Railing Tangga Pipa Stainless Ø2" 6.20 m1 Rp. 127,470.00 Rp. 790,314.00
2 Hand Railing Toilet Difabel, Pipa Stainless Ø2" 2.10 m1 Rp. 127,470.00 Rp. 267,687.00
3 Hand Railing Ramp Difabel, Pipa Stainless Ø2" 22.05 m1 Rp. 127,470.00 Rp. 2,810,713.50
4 Hand Railing Difabel Ruang PTSP, Pipa Stainless Ø2" 2.88 m1 Rp. 127,470.00 Rp. 367,113.60
5 Rangka Hollow Railing Lantai 2 5.64 m2 Rp. 161,429.00 Rp. 910,459.56
6 Guiding Block Difabel (Line Type) Rubber 30cm x 30cm 3.15 m2 Rp. 302,069.00 Rp. 951,517.35
7 Guiding Block Difabel (Spot Type) Rubber 30cm x 30cm 0.81 m2 Rp. 302,069.00 Rp. 244,675.89

SUB TOTAL Rp. 6,342,480.90


II PEKERJAAN INTERIOR
1 Pasang Backdrop Ruang PTSP BD1
- Pasang Multiplek 9mm + Rangka Kayu 10.07 m2 Rp. 167,709.00 Rp. 1,688,775.96
- Pasang HPL 10.07 m2 Rp. 200,807.00 Rp. 2,022,062.23
- Pasang Huruf "KUA PUSAKA " 9.00 bh Rp. 121,897.00 Rp. 1,097,073.00
- Pasang Huruf "PUSAT LAYANAN KEAGAMAAN" 21.00 bh Rp. 102,097.00 Rp. 2,144,037.00
- Pasang Huruf "KEMANTREN JETIS" 14.00 bh Rp. 102,097.00 Rp. 1,429,358.00
- Pekerjaan Pasang Logo Kemenag Backdrop 1.00 bh Rp. 355,630.00 Rp. 355,630.00
2 Pasang Backdrop Ruang Balai Nikah dan Manasik Haji BD2
- Pekerjaan Multiplek 9mm + Rangka Kayu 25.30 m2 Rp. 167,709.00 Rp. 4,243,654.87
- Pekerjaan Pasang HPL 25.30 m2 Rp. 200,807.00 Rp. 5,081,156.07
- Pekerjaan Multiplek Perforated Finishing Cat Duco 2.00 m2 Rp. 250,848.00 Rp. 501,696.00

SUB TOTAL Rp. 18,563,443.13


III PEKERJAAN SANITASI, SANITER DAN AIR BERSIH
1 Pasang Closet Duduk (Lengkap dengan Jetwasher) 4.00 unit A.5.1.1.1. Rp. 1,874,587.00 Rp. 7,498,348.00
2 Pasang Wastafel (Lengkap dengan Aksesorisnya) 1.00 unit A.5.1.1.5. Rp. 909,612.00 Rp. 909,612.00
3 Pasang Kran Air 5.00 bh A.5.1.1.35. Rp. 209,599.00 Rp. 1,047,995.00
4 Pasang Kran Air Wastafel 1.00 bh Rp. 243,699.00 Rp. 243,699.00
5 Pasang Floor Drain Stainless Steel 4.00 bh A.5.1.1.36 Rp. 300,487.00 Rp. 1,201,948.00
6 Pasang Roof Drain Stainless Steel 6.00 bh Rp. 329,087.00 Rp. 1,974,522.00

SUB TOTAL Rp. 12,876,124.00


IV PEKERJAAN FASAD
1 Pasang Granit Dinding Motif Marmer 60cm x 60cm Polished, Ornamen P1 2.96 m2 Rp. 358,301.00 Rp. 1,062,004.16
2 Pasang Huruf Fasad "BALAI NIKAH DAN MANASIK HAJI" Stainless Steel 24.00 bh Rp. 151,597.00 Rp. 3,638,328.00
3 Pasang Huruf Fasad "KANTOR URUSAN AGAMA" Stainless Steel 17.00 bh Rp. 151,597.00 Rp. 2,577,149.00
4 Pasang Huruf Fasad "KEMANTREN JETIS" Stainless Steel 14.00 bh Rp. 151,597.00 Rp. 2,122,358.00
5 Pasang Logo Kemenag Stainless Steel 1.00 unit Rp. 812,130.00 Rp. 812,130.00
6 Pasang FD2 Ornamen GRC Cetak Krawangan + Rangka Hollow dan Pengecatan 11.52 m2 Rp. 686,160.00 Rp. 7,904,563.20
7 Pasang Listplank GRC + Rangka dan Pengecatan 42.58 m1 Rp. 309,599.00 Rp. 13,182,725.42
8 Pasang List Profil Beton FD1 + Pengecatan 23.58 m1 Rp. 129,065.00 Rp. 3,043,352.70

SUB TOTAL Rp. 34,342,610.48


F. PEKERJAAN INSTALASI AIR BERSIH
Pengadaan, pemasangan dan pengujian peralatan utama sesuai packing list, memasangnya pada
lokasi yang ditentukan, termasuk pondasi, penyangga, penggantung, pengaman berikut
perlengkapan dan alat bantu pemasangan sesuai gambar, Ketentuan teknis dan petunjuk pabrik
pembuat.
I PERALATAN UTAMA
1 Pompa Transfer 1.00 set Rp. 2,100,000.00 Rp. 2,100,000.00
- Type : Pompa Transfer
- Power : 250 watt
- Head : 30 meter
- Debit : 70 Liter / menit (max)
- Panel kontrol, Fitting, asesoris standar & material bantu
2 Pompa Air Inverter Booster Pump IBP 375 BIT 1.00 Set Rp. 2,760,000.00 Rp. 2,760,000.00
- Kapasitas Max : 10 ltr/min , Power : 350 W / 220 V
- Pipa in & outlet : 1"
- Termasuk aksesoris dan material bantu

742376487.xlsx Page 6
II LANTAI DASAR
1 Stop Kran 1" 1.00 bh Rp. 195,712.00 Rp. 195,712.00
2 Pipa Supplay PVC WAVIN AW Ø 1 1/2 " 10.00 m1 Rp. 47,432.44 Rp. 474,324.40
3 Pipa distribusi PVC WAVIN AW Ø 1 " 15.00 m1 A.5.1.1.27. Rp. 38,709.44 Rp. 580,641.60
4 Pipa distribusi PVC WAVIN AW Ø 3/4" 10.00 m1 A.5.1.1.26. Rp. 28,383.96 Rp. 283,839.60
5 Pipa penguras PVC WAVIN AW Ø 1 " 15.00 m1 A.5.1.1.27. Rp. 38,709.44 Rp. 580,641.60
III LANTAI 2
1 Stop Kran 1" 1.00 bh Rp. 195,712.00 Rp. 195,712.00
2 Pipa Supplay PVC WAVIN AW Ø 1 1/2 " 10.00 m1 Rp. 47,432.44 Rp. 474,324.40
3 Pipa distribusi PVC WAVIN AW Ø 1 " 15.00 m1 A.5.1.1.27. Rp. 38,709.44 Rp. 580,641.60
4 Pipa distribusi PVC WAVIN AW Ø 3/4" 10.00 m1 A.5.1.1.26. Rp. 28,383.96 Rp. 283,839.60
5 Pipa penguras PVC WAVIN AW Ø 1 " 15.00 m1 A.5.1.1.27. Rp. 47,432.44 Rp. 711,486.60
IV BAK/TANGKI PENAMPUNGAN AIR
1 Tangki air Total Drain TD 1.000 Liter (Inklude Instalasi) 1.00 Unit Rp. 4,500,000.00 Rp. 4,500,000.00

SUB TOTAL Rp. 13,721,163.40


G. PEKERJAAN AIR BEKAS, AIR KOTOR, SALURAN AIR HUJAN
I LANTAI DASAR
1 Sanitasi Air Bekas
Pipa PVC WAVIN AW Ø 2" 5.00 m1 A.5.1.1.29. Rp. 74,882.94 Rp. 374,414.70
Pipa PVC WAVIN AW Ø 3" 15.00 m1 A.5.1.1.31. Rp. 137,933.79 Rp. 2,069,006.78
Pipa PVC WAVIN AW Ø 4" 10.00 m1 A.5.1.1.32. Rp. 176,564.41 Rp. 1,765,644.10
2 Sumur resapan, Inklude dengan Bak Tanam 1.00 bh Rp. 2,500,000.00 Rp. 2,500,000.00
- Galian
- Buis beton dia. 80 cm (4 bh) & Tutup beton
- ijuk
3 Bak kontrol 1.00 bh Rp. 300,000.00 Rp. 300,000.00
4 Sanitasi Air Kotor
Pipa PVC WAVIN AW Ø 4" 20.00 m1 A.5.1.1.32. Rp. 176,564.41 Rp. 3,531,288.20
Pipa vent PVC WAVIN Ø 1" 4.00 m1 A.5.1.1.27. Rp. 47,432.44 Rp. 189,729.76
5 Bak kontrol 1.00 bh Rp. 300,000.00 Rp. 300,000.00
6 Biofill BF-03 1.00 unit Rp. 6,500,000.00 Rp. 6,500,000.00
- Galian
- Beton penahan kedap air, dinding bata + plester acian dan Tutup beton
7 Sumur resapan, Inklude dengan Bak Tanam 1.00 bh Rp. 2,500,000.00 Rp. 2,500,000.00
- Galian
- Buis beton dia. 80 cm (4 bh) & Tutup beton
- ijuk
II LANTAI 2
1 Sanitasi Air Bekas
Pipa PVC WAVIN AW Ø 2" 6.00 m1 A.5.1.1.29. Rp. 74,882.94 Rp. 449,297.64
Pipa PVC WAVIN AW Ø 3" 8.00 m1 A.5.1.1.31. Rp. 137,933.79 Rp. 1,103,470.28
2 Sanitasi Air Kotor
Pipa PVC WAVIN AW Ø 4" 10.00 m1 A.5.1.1.32. Rp. 176,564.41 Rp. 1,765,644.10
Pipa vent PVC WAVIN Ø 1" 4.00 m1 A.5.1.1.27. Rp. 47,432.44 Rp. 189,729.76
3 Sanitasi Air Hujan
Pipa PVC WAVIN AW Ø 3" 16.00 m1 A.5.1.1.31. Rp. 137,933.79 Rp. 2,206,940.56
Pipa Metal Galvanis Ø 3" 32.00 m1 Rp. 152,322.94 Rp. 4,874,334.08

SUB TOTAL Rp. 30,619,499.96

742376487.xlsx Page 7
H. PEKERJAAN PENYEDIAAN JARINGAN & DISTRIBUSI LISTRIK
I JARINGAN LISTRIK SISTEM
Penambahan Daya & Perijinan PLN
1 Biaya Penambahan daya 2,3 KVA ke 7,7 KVA 1.00 ls Rp. 6,480,000.00 Rp. 6,480,000.00
2 Biaya Pengurusan Ijin 1.00 ls Rp. 500,000.00 Rp. 500,000.00
II PANEL TEGANGAN RENDAH & KABEL TOEVOER
Box Panel - Wall mounted cubicle, steel sheet metal ( 2 mm min), cat bakar . Komponen sesuai
dengan diagram satu garis pada gbr rencana, lengkap dgn grounding panel (netral+body).
1 PANEL SDP PP LANTAI DASAR 1.00 unit Rp. 6,528,170.00 Rp. 6,528,170.00
- Panel Box Wall Mounted 70x50x25
- Pilot lamp & fuse
- Frekuensi meter
- CT 1000/5A
- Ampere meter
- Voltmeter (0-500V)
- Selector switch
- MCCB 20 A, 7.5 KA
- MCB 10 A, 1P 6 KA
- Busbar RSTN-GND
- Kabel, Wiring & Pemasangan
- Material Bantu
2 PANEL SDP PP LANTAI 2 1.00 unit Rp. 6,412,670.00 Rp. 6,412,670.00
- Panel Box Wall Mounted 70x50x25
- Pilot lamp & fuse
- Frekuensi meter
- CT 1000/5A
- Ampere meter
- Voltmeter (0-500V)
- Selector switch
- MCCB 20 A, 18 KA
- MCB 10 A, 1P 6 KA
- Busbar RSTN-GND
- Kabel, Wiring & Pemasangan
- Material Bantu
III INSTALASI KABEL FEEDER & TOEVOER
Instalasi kabel dibawah tanah dengan menggunakan pelindung tekanan mekanis berupa pipa
besi atau buis beton dengan diameter menyesuaikan ukuran kabel toevoer
1 Kabel dari KWH Meter ke PP - 01, NYY - 4 x 25 mm2 15.00 m1 Rp. 359,177.94 Rp. 5,387,669.10
2 Kabel dari PP - 01 ke PP - 02, NYY - 4 x 16 mm2 15.00 m1 Rp. 230,477.94 Rp. 3,457,169.10

SUB TOTAL Rp. 28,765,678.20


I. PEKERJAAN INSTALASI PENERANGAN & KOTAK KONTAK
I INSTALASI GEDUNG
1 INSTALASI LANTAI DASAR
- Lampu RM SLIM LED PANEL 45W 4.00 bh Rp. 806,162.50 Rp. 3,224,650.00
- Lampu Downlight LED, SMART BRIGHT 24W 9.00 bh Rp. 322,162.50 Rp. 2,899,462.50
- Lampu Downlight LED, SMART BRIGHT 12W 6.00 bh Rp. 304,012.50 Rp. 1,824,075.00
- Lampu Downlight LED, SMART BRIGHT 9W 3.00 bh Rp. 243,512.50 Rp. 730,537.50
- Saklar Tunggal 6.00 bh Rp. 32,752.50 Rp. 196,515.00
- Saklar Ganda 2.00 bh Rp. 41,827.50 Rp. 83,655.00
- Instalasi penerangan 22.00 ttk Rp. 178,022.17 Rp. 3,916,487.67
- Outletwall stopkontak, tunggal, 1ph, 10A/250VA 6.00 bh Rp. 47,877.50 Rp. 287,265.00
- Instalasi stopkontak dan saklar 14.00 ttk Rp. 243,197.17 Rp. 3,404,760.33
2 INSTALASI LANTAI 2
- Lampu RM SLIM LED PANEL 45W 4.00 bh Rp. 806,162.50 Rp. 3,224,650.00
- Lampu Downlight LED, SMART BRIGHT 24W 7.00 bh Rp. 322,162.50 Rp. 2,255,137.50
- Lampu Downlight LED, SMART BRIGHT 9W 2.00 bh Rp. 243,512.50 Rp. 487,025.00
- Saklar Tunggal 3.00 bh Rp. 32,752.50 Rp. 98,257.50
- Saklar Ganda 4.00 bh Rp. 41,827.50 Rp. 167,310.00
- Instalasi penerangan 13.00 ttk Rp. 178,022.17 Rp. 2,314,288.17
- Outletwall stopkontak, tunggal, 1ph, 10A/250VA 7.00 bh Rp. 47,877.50 Rp. 335,142.50
- Instalasi stopkontak dan saklar 14.00 ttk Rp. 243,197.17 Rp. 3,404,760.33

SUB TOTAL Rp. 28,853,979.00


J. PEKERJAAN INSTALASI TATA UDARA
I LANTAI DASAR
1 Instalasi sparing pipa refrigerant + pipa drain 4.00 titik Rp. 150,000.00 Rp. 600,000.00
2 Instalasi power dan outlet kotak kontak AC NYM 3 x 2,5 mm 4.00 titik Rp. 351,822.17 Rp. 1,407,288.67
3 Stop Kontak AC 4.00 bh Rp. 126,527.50 Rp. 506,110.00
II LANTAI 2
1 Instalasi sparing pipa refrigerant + pipa drain 4.00 titik Rp. 150,000.00 Rp. 600,000.00
2 Instalasi power dan outlet kotak kontak AC NYM 3 x 2,5 mm 4.00 titik Rp. 351,822.17 Rp. 1,407,288.67
3 Stop Kontak AC 4.00 bh Rp. 126,527.50 Rp. 506,110.00

SUB TOTAL Rp. 5,026,797.33


N. PEKERJAAN PROTEKSI KEBAKARAN
I Fire Extinguisher
1 LANTAI DASAR
Fire Extinguisher Dry powder (Kelas A, B & C) Kap. 3,5 kg 1.00 unit Rp. 1,050,000.00 Rp. 1,050,000.00
2 LANTAI 2
Fire Extinguisher Dry powder (Kelas A, B & C) Kap. 3,5 kg 1.00 unit Rp. 1,050,000.00 Rp. 1,050,000.00

SUB TOTAL Rp. 2,100,000.00


O. PEKERJAAN INSTALASI PENYALUR PETIR

Pengadaan, pemasangan dan pengujian Sistim Penangkal Petir meliputi Air Terminal, Tiang
peninggi, Ijin Instalasi, kawat support/penahan, kawat penghantar dengan type sesuai spesifikasi
dan rekomendasi pabrik, grounding control box dan pantekan serta peralatan bantu lainnya
dipasang pada titik dan jalur yang sudah ditentukan sesuai gambar dan spesifikasi.

1 Air Terminal, R = 100 M, termasuk tiang peninggi, Pondasi (By CIVIL), tali penyokong dengan klem 1.00 bh Rp. 4,500,000.00 Rp. 4,500,000.00
penjepit, tali support dan kelengkapan lainnya sesuai gambar dan spesifikasi dan rekomendasi
pemasangan dari produk yang digunakan.
2 Sertifikat Instalasi dari Disnaker atau yang terkait 1.00 ls Rp. 1,500,000.00 Rp. 1,500,000.00
3 Kabel NYY 70 mm2 in Conduit Dia. 32 mm 20.00 m1 Rp. 120,000.00 Rp. 2,400,000.00
4 Grounding Control Box (GCB) 2.00 set Rp. 2,280,000.00 Rp. 4,560,000.00
Pengadaan, pemasangan dan pengujian Grounding Control Box (GCB), termasuk elektroda pentanahan
yang terbuat dari Copper Rod sesuai spesifikasi, yang ditanam sampai mendapatkan sumber air untuk
mendapatkan tahanan tanah maksimum 2 Ohm lengkap dengan Kawat BC, perlengkapan bantu,
Clamp/Cable Shoes, yang dipasang dalam bak kontrol dengan penutup dan pengangkatnya sesuai
gambar dan spesifikasi.

SUB TOTAL Rp. 12,960,000.00

742376487.xlsx Page 8
ANALISA HARGA SATUAN ARSITEKTURAL

1 m2 PEMBERSIHAN LOKASI
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.2500 86,600 21,650.00
2 Mandor OH 0.1000 100,000 10,000.00
Jumlah Harga Tenaga Kerja 31,650.00
B Bahan
1 -
Jumlah Harga Bahan -
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 31,650.00
E Overhead + Profit 10.00% 3,165.00
F Harga Satuan Pekerjaan ( D + E ) 34,815.00

PASANG 1 Bh PAPAN NAMA PROYEK 80x120 cm (BAHAN FLEXI)


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.2000 86,600 17,320.00
2 Tukang Kayu OH 0.4000 98,000 39,200.00
3 Kepala Tukang Kayu OH 0.0200 106,000 2,120.00
4 Mandor OH 0.0200 100,000 2,000.00
Jumlah Harga Tenaga Kerja 60,640.00
B Bahan
1 Kayu m3 0.0350 1,570,000 54,950.00
2 Print Outdoor Flexi m2 1.0000 20,000 20,000.00
3 Paku kg 0.6000 23,000 13,800.00
4 PC kg 16.8000 1,275 21,420.00
5 Pasir Beton m3 0.0270 275,000 7,425.00
6 Kerikil Beton m3 0.0405 210,833 8,538.75

Jumlah Harga Bahan 126,133.75


C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 186,773.75
E Overhead + Profit 10.00% 18,677.37
F Harga Satuan Pekerjaan ( D + E ) 205,451.00
U.1.1.2 (c) PEMBUATAN 1 m1 PAGAR SEMENTARA DARI SENG GELOMBANG RANGKA KAYU TINGGI 2 METER
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.2500 86,600 21,650.00
2 Tukang Kayu OH 0.1250 98,000 12,250.00
3 Tukang Batu OH 0.1250 96,000 12,000.00
4 Kepala Tukang Kayu OH 0.0250 101,000 2,525.00
5 Mandor OH 0.0080 100,000 800.00
Jumlah Harga Tenaga Kerja 49,225.00
B Bahan
1 Kayu glugu m3 0.0310 1,570,000 48,670.00
2 Seng Gelombang lbr 1.3125 80,000 105,000.00
3 Paku Biasa 5" kg 0.4271 23,500 10,036.85
4 Semen Portland kg 26.4060 1,275 33,667.65
5 Pasir Beton kg 61.5600 196 12,092.14
6 Kerikil kg 83.3490 117 9,762.64
7 Air lte 17.4150 3 60.08

Jumlah Harga Bahan 219,289.36


C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 268,514.36
E Overhead + Profit 10.00% 26,851.44
F Harga Satuan Pekerjaan ( D + E ) 295,365.00

1 m3 GALIAN TANAH BIASA SEDALAM ≤ 1 m


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.5630 86,600 48,755.80
2 Mandor OH 0.0563 100,000 5,630.00
Jumlah Harga Tenaga Kerja 54,385.80
B Bahan
1 -
Jumlah Harga Bahan -
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 54,385.80
E Overhead + Profit 10.00% 5,438.58
F Harga Satuan Pekerjaan ( D + E ) 59,824.00

U.3.4.1.a.5 (c) 1 m3 GALIAN TANAH BIASA SEDALAM > 1 m s.d. 2 m


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.6750 86,600 58,455.00
2 Mandor OH 0.0675 100,000 6,750.00
Jumlah Harga Tenaga Kerja 65,205.00
B Bahan
1 -
Jumlah Harga Bahan -
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 65,205.00
E Overhead + Profit 10.00% 6,520.50
F Harga Satuan Pekerjaan ( D + E ) 71,725.00
U.3.5.1.a (c) 1 m3 Urukan Kembali Galian Tanah ( > 0 s.d. 200 m3), tanpa
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.5000 86,600 43,300.00
2 Mandor OH 0.2500 100,000 25,000.00
Jumlah Harga Tenaga Kerja 68,300.00
B Bahan
1 -
Jumlah Harga Bahan -
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 68,300.00
E Overhead + Profit 10.00% 6,830.00
F Harga Satuan Pekerjaan ( D + E ) 75,130.00

1 m3 TIMBUNAN TANAH PENINGGIAN ELEVASI


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.3000 86,600 25,980.00
2 Mandor OH 0.0100 100,000 1,000.00
Jumlah Harga Tenaga Kerja 26,980.00
B Bahan
1 Tanah Urug m3 1.2000 112,900 135,480.00
Jumlah Harga Bahan 135,480.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 162,460.00
E Overhead + Profit 10.00% 16,246.00
F Harga Satuan Pekerjaan ( D + E ) 178,706.00

1.7.14.c (a) 1 m3 TIMBUNAN TANAH + PEMADATAN MENGGUNAKAN STAMPER


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.3000 86,600 25,980.00
2 Mandor OH 0.0100 100,000 1,000.00
Jumlah Harga Tenaga Kerja 26,980.00
B Bahan

Jumlah Harga Bahan -


C Peralatan
1 Pemadatan dengan Stamper hari 0.0770 295,000 22,715.00
Jumlah Harga Peralatan 22,715.00
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 49,695.00
E Overhead + Profit 10.00% 4,969.50
F Harga Satuan Pekerjaan ( D + E ) 54,664.00
1.7.2.d (c) 1 m3 URUGAN PASIR
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.3000 86,600 25,980.00
2 Mandor OH 0.0100 100,000 1,000.00
Jumlah Harga Tenaga Kerja 26,980.00
B Bahan
1 Pasir Urug m3 1.2000 215,000 258,000.00
Jumlah Harga Bahan 258,000.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 284,980.00
E Overhead + Profit 10.00% 28,498.00
F Harga Satuan Pekerjaan ( D + E ) 313,478.00

1 m3 URUGAN KERIKIL
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.2500 86,600 21,650.00
2 Mandor OH 0.0250 100,000 2,500.00
Jumlah Harga Tenaga Kerja 24,150.00
B Bahan
1 Kerikil m3 1.2000 210,833 253,000.00
Jumlah Harga Bahan 253,000.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 277,150.00
E Overhead + Profit 10.00% 27,715.00
F Harga Satuan Pekerjaan ( D + E ) 304,864.00

1 m3 PONDASI BATU BELAH 1 Pc : 4 Ps


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 1.5000 86,600 129,900.00
2 Tukang Batu OH 0.7500 96,000 72,000.00
3 Kepala Tukang OH 0.0750 101,000 7,575.00
4 Mandor OH 0.0750 100,000 7,500.00
Jumlah Harga Tenaga Kerja 216,975.00
B Bahan
1 Batu Belah 15/20 m3 1.2000 194,444 233,333.33
2 Pasir Pasang m3 0.5610 215,000 120,615.00
3 Semen PC Kg 117.0000 1,275 149,175.00
Jumlah Harga Bahan 503,123.33
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 720,098.33
E Overhead + Profit 10.00% 72,009.83
F Harga Satuan Pekerjaan ( D + E ) 792,108.00
A.4.4.1.26. Pemasangan 1m2 dinding bata ringan tebal 10cm dengan mortar siap pakai
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.6710 86,600 58,108.60
2 Tukang Batu OH 0.1300 96,000 12,480.00
3 Kepala Tukang OH 0.0130 101,000 1,313.00
4 Mandor OH 0.0030 100,000 300.00
Jumlah Harga Tenaga Kerja 72,201.60
B Bahan
1 Bata ringan tebal 10cm buah 8.4000 8,400 70,560.00
2 Mortar Siap Pakai (semen instan) Kg 0.0630 1,500 94.50

Jumlah Harga Bahan 70,654.50


C Peralatan
1 Peralatan % (Bahan) 10.0000 70,655 7,065.45
Jumlah Harga Peralatan 7,065.45
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 149,921.55
E Overhead + Profit 10.00% 14,992.16
F Harga Satuan Pekerjaan ( D + E ) 164,913.00

PEMASANGAN 1 m2 PLESTERAN DENGAN MORTAR SIAP PAKAI


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.3000 86,600 25,980.00
2 Tukang Batu OH 0.1500 96,000 14,400.00
3 Kepala Tukang OH 0.0150 101,000 1,515.00
4 Mandor OH 0.0150 100,000 1,500.00
Jumlah Harga Tenaga Kerja 43,395.00
B Bahan
1 Mortar Siap Pakai (Plesteran) kg 7.7760 1,250 9,720.00

Jumlah Harga Bahan 9,720.00


C Peralatan
1 Peralatan % (Bahan) 10.0000 9,720 972.00
Jumlah Harga Peralatan 972.00
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 54,087.00
E Overhead + Profit 10.00% 5,408.70
F Harga Satuan Pekerjaan ( D + E ) 59,495.00

PEMASANGAN 1 m2 ACIAN DENGAN MORTAR SIAP PAKAI


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.1000 86,600 8,660.00
2 Tukang Batu OH 0.1000 96,000 9,600.00
3 Kepala Tukang OH 0.0100 101,000 1,010.00
4 Mandor OH 0.0100 100,000 1,000.00
Jumlah Harga Tenaga Kerja 20,270.00
B Bahan
1 Mortar Siap Pakai (Acian) kg 2.0000 1,875 3,750.00

Jumlah Harga Bahan 3,750.00


C Peralatan
1 Peralatan % (Bahan) 10.0000 3,750 375.00
Jumlah Harga Peralatan 375.00
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 24,395.00
E Overhead + Profit 10.00% 2,439.50
F Harga Satuan Pekerjaan ( D + E ) 26,834.00
PEMASANGAN 1 m' PLESTERAN SKONING DENGAN MORTAR SIAP PAKAI LEBAR 10 cm
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.0480 86,600 4,156.80
2 Tukang Batu OH 0.2400 96,000 23,040.00
3 Kepala Tukang OH 0.0240 101,000 2,424.00
4 Mandor OH 0.0024 100,000 240.00
Jumlah Harga Tenaga Kerja 29,860.80
B Bahan
1 Mortar Siap Pakai (Acian) kg 0.5000 1,875 937.50

Jumlah Harga Bahan 937.50


C Peralatan
1 Peralatan % (Bahan) 10.0000 938 93.75
Jumlah Harga Peralatan 93.75
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 30,892.05
E Overhead + Profit 10.00% 3,089.21
F Harga Satuan Pekerjaan ( D + E ) 33,981.00

3.3.10.(c) PENGECATAN 1 m2 TEMBOK BARU (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP) INTERIOR
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.0200 86,600 1,732.00
2 Tukang Cat OH 0.0630 90,000 5,670.00
3 Kepala Tukang OH 0.0063 98,000 617.40
4 Mandor OH 0.0030 100,000 300.00
Jumlah Harga Tenaga Kerja 8,319.40
B Bahan
1 Plamir kg 0.1000 34,000 3,400.00
2 Cat Dasar kg 0.1000 34,000 3,400.00
3 Cat Penutup kg 0.2600 34,000 8,840.00
Jumlah Harga Bahan 15,640.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 23,959.40
E Overhead + Profit 10.00% 2,395.94
F Harga Satuan Pekerjaan ( D + E ) 26,355.00

PENGECATAN 1 m2 TEMBOK BARU (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP) EXTERIOR
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.0200 86,600 1,732.00
2 Tukang Cat OH 0.0630 90,000 5,670.00
3 Kepala Tukang OH 0.0063 98,000 617.40
4 Mandor OH 0.0030 100,000 300.00
Jumlah Harga Tenaga Kerja 8,319.40
B Bahan
1 Plamir kg 0.1000 34,000 3,400.00
2 Cat Dasar kg 0.1000 127,000 12,700.00
3 Cat Penutup kg 0.2600 127,000 33,020.00
Jumlah Harga Bahan 49,120.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 57,439.40
E Overhead + Profit 10.00% 5,743.94
F Harga Satuan Pekerjaan ( D + E ) 63,183.00
Pasang 1m2 Partisi Gypsum 9mm 2 sisi rangka kayu (PT1, PT2, PT4)
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.3000 86,600 25,980.00
2 Tukang Kayu OH 0.5000 98,000 49,000.00
3 Kepala Tukang OH 0.0370 106,000 3,922.00
4 Mandor OH 0.0150 100,000 1,500.00
Jumlah Harga Tenaga Kerja 80,402.00
B Bahan
1 Rangka Kayu m3 0.0048 1,920,000 9,216.00
2 Gypsum 9mm lbr 0.7280 88,500 64,428.00
3 Kompon kg 0.7000 7,765 5,435.50
4 Paku kg 1.4000 23,500 32,900.00
5 Cat Partisi m2 1.0000 24,258 24,258.40
Jumlah Harga Bahan 136,237.90
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 216,639.90
E Overhead + Profit 10.00% 21,663.99
F Harga Satuan Pekerjaan ( D + E ) 238,303.00

Pasang 1m2 Partisi Gypsum 9mm 2 sisi rangka kayu (PT3, PT5)
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.3000 86,600 25,980.00
2 Tukang Kayu OH 0.5000 98,000 49,000.00
3 Kepala Tukang OH 0.0370 106,000 3,922.00
4 Mandor OH 0.0150 100,000 1,500.00
Jumlah Harga Tenaga Kerja 80,402.00
B Bahan
1 Rangka Kayu m3 0.0048 1,920,000 9,216.00
2 Gypsum 9mm lbr 0.7280 88,500 64,428.00
3 Kompon kg 0.7000 7,765 5,435.50
4 Paku kg 1.4000 23,500 32,900.00
5 Cat Partisi m2 1.0000 24,258 24,258.40
5 Engsel Pintu bh 2.0000 11,500 23,000.00
Jumlah Harga Bahan 159,237.90
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 239,639.90
E Overhead + Profit 10.00% 23,963.99
F Harga Satuan Pekerjaan ( D + E ) 263,603.00

PENGECATAN 1 m2 PARTISI
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.0200 86,600 1,732.00
2 Tukang Cat OH 0.0630 90,000 5,670.00
3 Kepala Tukang OH 0.0063 98,000 617.40
4 Mandor OH 0.0030 100,000 300.00
Jumlah Harga Tenaga Kerja 8,319.40
B Bahan
1 Plamir Kg 0.1000 34,650 3,465.00
2 Cat dasar Kg 0.1000 34,650 3,465.00
3 Cat penutup Kg 0.2600 34,650 9,009.00

Jumlah Harga Bahan 15,939.00


C Peralatan
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 24,258.40
E Overhead + Profit 10.00% 2,425.84
F Harga Satuan Pekerjaan ( D + E ) 26,684.00

PENGECATAN 1 m2 WATERPROOFING CAT KAMAR MANDI DAN DAK TALANG BETON


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.0400 86,600 3,464.00
2 Tukang Cat OH 0.1260 90,000 11,340.00
3 Kepala Tukang OH 0.0126 98,000 1,234.80
4 Mandor OH 0.0060 100,000 600.00
Jumlah Harga Tenaga Kerja 16,638.80
B Bahan
1 Waterproofing Dasar kg 0.4500 13,500 6,075.00
2 Waterproofing Finish kg 0.4500 63,000 28,350.00
Jumlah Harga Bahan 34,425.00
C Peralatan
1 Alat Bantu ls 1.0000 5,000 5,000.00
Jumlah Harga Peralatan 5,000.00
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 56,063.80
E Overhead + Profit 10.00% 5,606.38
F Harga Satuan Pekerjaan ( D + E ) 61,670.00
PENGECATAN 1 m2 WATERPROOFING COATING DAK TALANG
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.2500 86,600 21,650.00
2 Tukang Cat OH 0.5000 90,000 45,000.00
3 Kepala Tukang OH 0.0500 98,000 4,900.00
4 Mandor OH 0.0500 100,000 5,000.00
Jumlah Harga Tenaga Kerja 76,550.00
B Bahan
1 Elastex Fiber Flex PU m2 1.0500 63,000 66,150.00
Jumlah Harga Bahan 66,150.00
C Peralatan
1 Alat Bantu ls 1.0000 23,153 23,152.50
Jumlah Harga Peralatan 23,152.50
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 165,852.50
E Overhead + Profit 10.00% 16,585.25
F Harga Satuan Pekerjaan ( D + E ) 182,437.00

PENGECATAN 1 m2 LISTPLANK
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.0700 86,600 6,062.00
2 Tukang Cat OH 0.0090 90,000 810.00
3 Kepala Tukang OH 0.0060 98,000 588.00
4 Mandor OH 0.0030 100,000 300.00
Jumlah Harga Tenaga Kerja 7,760.00
B Bahan
1 Menie kg 0.2000 57,500 11,500.00
2 Plamur kg 0.1500 31,100 4,665.00
3 Cat Dasar kg 0.1700 57,500 9,775.00
4 Cat Penutup kg 0.2600 57,500 14,950.00

Jumlah Harga Bahan 40,890.00


C Peralatan

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 48,650.00
E Overhead + Profit 10.00% 4,865.00
F Harga Satuan Pekerjaan ( D + E ) 53,515.00

Pemasangan 1m2 lantai vynil 152,4 mm x 914,4 mm, tebal 3,0 mm


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja Oh 0.1500 86,600 12,990.00
2 Tukang batu Oh 0.1500 96,000 14,400.00
3 Kepala tukang Oh 0.0150 101,000 1,515.00
4 Mandor Oh 0.0080 100,000 800.00

Jumlah Harga Tenaga Kerja 29,705.00


B Bahan
1 vynil 152,4 mm x 914,4 mm, tebal 3,0 mm m2 1.1000 176,647 194,311.38
2 Lem karet kg 0.3500 50,000 17,500.00

Jumlah Harga Bahan 211,811.38


C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 241,516.38
E Overhead + Profit 10.00% 24,151.64
F Harga Satuan Pekerjaan ( D + E ) 265,668.00
PEMASANGAN 1 m2 KERAMIK LANTAI 60x60 POLISHED
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.2400 86,600 20,784.00
2 Tukang Batu OH 0.1200 96,000 11,520.00
3 Kepala Tukang OH 0.0120 101,000 1,212.00
4 Mandor OH 0.0120 100,000 1,200.00
Jumlah Harga Tenaga Kerja 34,716.00
B Bahan
1 Keramik Lantai 60x60 Polished m2 1.0600 121,000 128,260.00
2 Semen Pc kg 9.6000 1,275 12,240.00
3 Pasir Pasang m3 0.0450 215,000 9,675.00
4 Semen Warna kg 0.2500 15,700 3,925.00
Jumlah Harga Bahan 154,100.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 188,816.00
E Overhead + Profit 10.00% 18,881.60
F Harga Satuan Pekerjaan ( D + E ) 207,697.00

PEMASANGAN 1 m2 KERAMIK LANTAI 60x60 UNPOLISHED


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.2400 86,600 20,784.00
2 Tukang Batu OH 0.1200 96,000 11,520.00
3 Kepala Tukang OH 0.0120 101,000 1,212.00
4 Mandor OH 0.0120 100,000 1,200.00
Jumlah Harga Tenaga Kerja 34,716.00
B Bahan
1 Keramik Lantai 60x60 Unpolished m2 1.1000 125,000 137,500.00
2 Semen Pc kg 9.6000 1,275 12,240.00
3 Pasir Pasang m3 0.0450 215,000 9,675.00
4 Semen Warna kg 0.2500 15,700 3,925.00
Jumlah Harga Bahan 163,340.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 198,056.00
E Overhead + Profit 10.00% 19,805.60
F Harga Satuan Pekerjaan ( D + E ) 217,861.00

PEMASANGAN 1 m2 KERAMIK LANTAI 40x40 Anti Selip


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.2400 86,600 20,784.00
2 Tukang Batu OH 0.1200 96,000 11,520.00
3 Kepala Tukang OH 0.0120 101,000 1,212.00
4 Mandor OH 0.0120 100,000 1,200.00
Jumlah Harga Tenaga Kerja 34,716.00
B Bahan
1 Keramik Lantai 40x40 Anti selip m2 1.1000 95,000 104,500.00
2 Semen Pc kg 9.6000 1,275 12,240.00
3 Pasir Pasang m3 0.0450 215,000 9,675.00
4 Semen Warna kg 0.2500 15,700 3,925.00
Jumlah Harga Bahan 130,340.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 165,056.00
E Overhead + Profit 10.00% 16,505.60
F Harga Satuan Pekerjaan ( D + E ) 181,561.00
PEMASANGAN 1 m2 KERAMIK DINDING 20x40 POLISHED
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.2400 86,600 20,784.00
2 Tukang Batu OH 0.1200 96,000 11,520.00
3 Kepala Tukang OH 0.0120 101,000 1,212.00
4 Mandor OH 0.0120 100,000 1,200.00
Jumlah Harga Tenaga Kerja 34,716.00
B Bahan
1 Keramik Dinding 20x40 Polished m2 1.0600 87,000 92,220.00
2 Semen Pc kg 9.6000 1,275 12,240.00
3 Pasir Pasang m3 0.0180 215,000 3,870.00
4 Semen Warna kg 0.2500 15,700 3,925.00
Jumlah Harga Bahan 112,255.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 146,971.00
E Overhead + Profit 10.00% 14,697.10
F Harga Satuan Pekerjaan ( D + E ) 161,668.00

PEMASANGAN 1 m' LISTELLO 10x20


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.0500 86,600 4,330.00
2 Tukang Batu OH 0.1000 96,000 9,600.00
3 Kepala Tukang OH 0.0100 101,000 1,010.00
4 Mandor OH 0.0030 100,000 300.00
Jumlah Harga Tenaga Kerja 15,240.00
B Bahan
1 Listello Dinding 10x20 bh 1.4100 16,000 22,560.00
2 Semen Pc kg 0.4080 1,275 520.20
3 Pasir Pasang m3 0.0010 215,000 215.00
4 Semen Warna kg 0.0600 15,700 942.00
Jumlah Harga Bahan 24,237.20
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 39,477.20
E Overhead + Profit 10.00% 3,947.72
F Harga Satuan Pekerjaan ( D + E ) 43,424.00

PEMASANGAN 1 m' STEPNOSHING TANGGA 10X60


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.0900 86,600 7,794.00
2 Tukang Batu OH 0.0900 96,000 8,640.00
3 Kepala Tukang OH 0.0090 101,000 909.00
4 Mandor OH 0.0050 100,000 500.00
Jumlah Harga Tenaga Kerja 17,843.00
B Bahan
1 Stepnoshing 10x60 m' 1.0000 40,000 40,000.00
2 Semen Pc kg 1.2000 1,275 1,530.00
3 Pasir Pasang m3 0.0030 215,000 645.00
4 Semen Warna kg 0.1000 15,700 1,570.00
Jumlah Harga Bahan 43,745.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 61,588.00
E Overhead + Profit 10.00% 6,158.80
F Harga Satuan Pekerjaan ( D + E ) 67,746.00
PEMASANGAN 1 m' PLINT GRANIT 10x60
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.0900 86,600 7,794.00
2 Tukang Batu OH 0.0900 96,000 8,640.00
3 Kepala Tukang OH 0.0090 101,000 909.00
4 Mandor OH 0.0050 100,000 500.00
Jumlah Harga Tenaga Kerja 17,843.00
B Bahan
1 Plint Granit 10x60cm bh 1.6700 25,000 41,750.00
2 Semen Pc kg 1.1400 1,275 1,453.50
3 Pasir Pasang m3 0.0030 215,000 645.00
4 Semen Warna kg 0.0250 15,700 392.50
Jumlah Harga Bahan 44,241.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 62,084.00
E Overhead + Profit 10.00% 6,208.40
F Harga Satuan Pekerjaan ( D + E ) 68,292.00

PEMASANGAN Guiding Block (Line Type) Rubber


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.2600 86,600 22,516.00
2 Tukang Batu OH 0.1300 96,000 12,480.00
3 Kepala Tukang OH 0.0130 101,000 1,313.00
4 Mandor OH 0.0130 100,000 1,300.00
Jumlah Harga Tenaga Kerja 37,609.00
B Bahan
1 Rubber Pengarah 30x30, Line Type m2 1.1000 170,000 187,000.00
2 Lem Perekat ls 1.0000 50,000 50,000.00

Jumlah Harga Bahan 237,000.00


C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 274,609.00
E Overhead + Profit 10.00% 27,460.90
F Harga Satuan Pekerjaan ( D + E ) 302,069.00

PEMASANGAN Guiding Block (Spot Type) Rubber


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.2600 86,600 22,516.00
2 Tukang Batu OH 0.1300 96,000 12,480.00
3 Kepala Tukang OH 0.0130 101,000 1,313.00
4 Mandor OH 0.0130 100,000 1,300.00
Jumlah Harga Tenaga Kerja 37,609.00
B Bahan
1 Rubber Pengarah 30x30, Spot Type m2 1.1000 170,000 187,000.00
2 Lem Perekat ls 1.0000 50,000 50,000.00

Jumlah Harga Bahan 237,000.00


C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 274,609.00
E Overhead + Profit 10.00% 27,460.90
F Harga Satuan Pekerjaan ( D + E ) 302,069.00
PEMASANGAN 1 m2 PLAFOND PVC, RANGKA HOLLOW
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.3000 86,600 25,980.00
2 Tukang Besi OH 0.3500 97,000 33,950.00
3 Kepala Tukang OH 0.0350 101,000 3,535.00
4 Mandor OH 0.0130 100,000 1,300.00
Jumlah Harga Tenaga Kerja 64,765.00
B Bahan
1 Rangka Pembagi, Hollow 1,5 x 3 cm m' 3.0000 3,500 10,500.00
2 Rangka Utama, Hollow 3,0 x 3,0 cm m' 2.5000 7,300 18,250.00
3 Rangka Penggantung, Hollow 1,5 x 3 cm m' 2.0000 3,500 7,000.00
4 Rangka Penggantung variasi kawat besi m' 1.5000 2,000 3,000.00
5 Plafon PVC 8mm m2 1.0000 105,000 105,000.00
6 Paku skrup kg 0.2000 23,500 4,700.00
Jumlah Harga Bahan 148,450.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 213,215.00
E Overhead + Profit 10.00% 21,321.50
F Harga Satuan Pekerjaan ( D + E ) 234,536.00

PEMASANGAN 1 m' UPCELLING PLAFOND PVC


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.1500 86,600 12,990.00
2 Tukang Besi OH 0.0500 97,000 4,850.00
3 Kepala Tukang OH 0.0050 101,000 505.00
4 Mandor OH 0.0050 100,000 500.00
Jumlah Harga Tenaga Kerja 18,845.00
B Bahan
1 Rangka Penggantung, Hollow 1,5 x 3 cm m' 2.0000 3,500 7,000.00
3 Plafon PVC m' 0.1650 105,000 17,325.00
4 Paku skrup bh 5.0000 23,500 117,500.00
Jumlah Harga Bahan 141,825.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 160,670.00
E Overhead + Profit 10.00% 16,067.00
F Harga Satuan Pekerjaan ( D + E ) 176,737.00

PEMASANGAN 1 m' LIST PLAFOND PVC


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.0100 86,600 866.00
2 Tukang Besi OH 0.0500 97,000 4,850.00
3 Kepala Tukang OH 0.0500 101,000 5,050.00
4 Mandor OH 0.0500 100,000 5,000.00
Jumlah Harga Tenaga Kerja 15,766.00
B Bahan
1 List Plafond PVC m' 1.0500 10,000 10,500.00
2 Paku skrup bh 2.0000 700 1,400.00
Jumlah Harga Bahan 11,900.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 27,666.00
E Overhead + Profit 10.00% 2,766.60
F Harga Satuan Pekerjaan ( D + E ) 30,432.00
PEMASANGAN 1 m' LISTPLANK
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.1000 86,600 8,660.00
2 Tukang Kayu OH 0.2000 98,000 19,600.00
3 Kepala Tukang OH 0.0200 106,000 2,120.00
4 Mandor OH 0.0050 100,000 500.00
Jumlah Harga Tenaga Kerja 30,880.00
B Bahan
1 Papan Listplank m' 0.3300 96,000 31,680.00
2 Paku 5 - 7 cm kg 0.0600 700 42.00
Jumlah Harga Bahan 31,722.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 62,602.00
E Overhead + Profit 10.00% 6,260.20
F Harga Satuan Pekerjaan ( D + E ) 68,862.00

PEKERJAAN 1m2 RANGKA ATAP BAJA RINGAN


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.2000 86,600 17,320.00
2 Tukang Besi OH 0.2150 97,000 20,855.00
3 Kepala Tukang OH 0.0100 101,000 1,010.00
4 Mandor OH 0.0500 100,000 5,000.00
Jumlah Harga Tenaga Kerja 44,185.00
B Bahan
1 C 75 .100 btg 0.3300 185,000 61,050.00
2 C 75. 75 btg 0.6500 125,000 81,250.00
3 Reng R 35. 45 btg 1.2500 52,000 65,000.00
4 Mur Baut pcs 27.0000 700 18,900.00
5 Dynabolt pcs 0.5500 3,600 1,980.00
Jumlah Harga Bahan 228,180.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 272,365.00
E Overhead + Profit 10.00% 27,236.50
F Harga Satuan Pekerjaan ( D + E ) 299,601.00

PEKERJAAN 1m2 PENUTUP ATAP GENTENG BETON


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.1250 86,600 10,825.00
2 Tukang Besi OH 0.0500 97,000 4,850.00
3 Kepala Tukang OH 0.0100 101,000 1,010.00
4 Mandor OH 0.0100 100,000 1,000.00
Jumlah Harga Tenaga Kerja 17,685.00
B Bahan
1 Genteng Romana Light - Flash bh 9.5000 15,000 142,500.00

Jumlah Harga Bahan 142,500.00


C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 160,185.00
E Overhead + Profit 10.00% 16,018.50
F Harga Satuan Pekerjaan ( D + E ) 176,203.00
PEKERJAAN 1m' PASANG NOK GENTENG BETON
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.2500 86,600 21,650.00
2 Tukang Besi OH 0.1500 97,000 14,550.00
3 Kepala Tukang OH 0.0150 101,000 1,515.00
4 Mandor OH 0.0130 100,000 1,300.00
Jumlah Harga Tenaga Kerja 39,015.00
B Bahan
1 Genteng Bubung (Cap Ridge) bh 3.3000 21,000 69,300.00
2 Semen Portland kg 10.0000 1,275 12,750.00
3 Pasir Pasang m3 0.0315 215,000 6,772.50
Jumlah Harga Bahan 88,822.50
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 127,837.50
E Overhead + Profit 10.00% 12,783.75
F Harga Satuan Pekerjaan ( D + E ) 140,621.00

PEKERJAAN 1m2 PASANG KACA ES 5mm


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.0150 86,600 1,299.00
2 Tukang Alumunium OH 0.1500 97,000 14,550.00
3 Kepala Tukang OH 0.0150 101,000 1,515.00
4 Mandor OH 0.0010 100,000 100.00
Jumlah Harga Tenaga Kerja 17,464.00
B Bahan
1 Kaca Es Tebal 5mm m2 1.1000 150,000 165,000.00
2 Engsel Kaca Jepit bh 2.0000 65,000 130,000.00
3 Sealent tube 0.0500 36,000 1,800.00
Jumlah Harga Bahan 296,800.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 314,264.00
E Overhead + Profit 10.00% 31,426.40
F Harga Satuan Pekerjaan ( D + E ) 345,690.00

PEKERJAAN 1m' PASANG KUSEN PINTU ALUMINIUM


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.0430 86,600 3,723.80
2 Tukang Aluminium OH 0.0430 97,000 4,171.00
3 Kepala Tukang OH 0.0040 101,000 404.00
4 Mandor OH 0.0020 100,000 200.00
Jumlah Harga Tenaga Kerja 8,498.80
B Bahan
1 Profil Kusen Alumunium 4" m' 1.1000 34,167 37,583.33
2 Sekrup Fixer bks 0.2000 12,000 2,400.00
3 Sealant tube 0.0600 36,000 2,160.00
Jumlah Harga Bahan 42,143.33
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 50,642.13
E Overhead + Profit 10.00% 5,064.21
F Harga Satuan Pekerjaan ( D + E ) 55,706.00

PEKERJAAN 1m' PASANG KUSEN JENDELA ALUMINIUM


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.0430 86,600 3,723.80
2 Tukang Aluminium OH 0.0430 97,000 4,171.00
3 Kepala Tukang OH 0.0040 101,000 404.00
4 Mandor OH 0.0020 100,000 200.00
Jumlah Harga Tenaga Kerja 8,498.80
B Bahan
1 Profil Kusen Alumunium 3" m' 1.1000 32,500 35,750.00
2 Sekrup Fixer bks 0.2000 12,000 2,400.00
3 Sealant tube 0.0600 36,000 2,160.00
Jumlah Harga Bahan 40,310.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 48,808.80
E Overhead + Profit 10.00% 4,880.88
F Harga Satuan Pekerjaan ( D + E ) 53,689.00
PEKERJAAN 1m' PASANG FRAME JENDELA ALUMINIUM
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.0850 86,600 7,361.00
2 Tukang Aluminium OH 0.0850 97,000 8,245.00
3 Kepala Tukang OH 0.0090 101,000 909.00
4 Mandor OH 0.0050 100,000 500.00
Jumlah Harga Tenaga Kerja 17,015.00
B Bahan
1 Frame Jendela Allumunium m' 1.1000 60,000 66,000.00
2 Skrup bh 2.0000 12,000 24,000.00
3 Sealant tube 0.2700 36,000 9,720.00
Jumlah Harga Bahan 99,720.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 116,735.00
E Overhead + Profit 10.00% 11,673.50
F Harga Satuan Pekerjaan ( D + E ) 128,408.00

PEKERJAAN 1m2 PASANG KACA BENING 5mm


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.0150 86,600 1,299.00
2 Tukang Aluminium OH 0.1500 97,000 14,550.00
3 Kepala Tukang OH 0.0150 101,000 1,515.00
4 Mandor OH 0.0010 100,000 100.00
Jumlah Harga Tenaga Kerja 17,464.00
B Bahan
1 Kaca tebal 5 mm m2 1.1000 130,000 143,000.00
2 Sealant tube 0.0500 36,000 1,800.00
Jumlah Harga Bahan 144,800.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 162,264.00
E Overhead + Profit 10.00% 16,226.40
F Harga Satuan Pekerjaan ( D + E ) 178,490.00

PEKERJAAN 1m2 PASANG KACA BENING 8mm


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.0150 86,600 1,299.00
2 Tukang Aluminium OH 0.1500 97,000 14,550.00
3 Kepala Tukang OH 0.0150 101,000 1,515.00
4 Mandor OH 0.0008 100,000 80.00
Jumlah Harga Tenaga Kerja 17,444.00
B Bahan
1 Kaca tebal 8 mm m2 1.1000 295,000 324,500.00
2 Sealant tube 0.0500 36,000 1,800.00
Jumlah Harga Bahan 326,300.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 343,744.00
E Overhead + Profit 10.00% 34,374.40
F Harga Satuan Pekerjaan ( D + E ) 378,118.00
PEKERJAAN 1m2 PASANG KACA TEMPERED 8mm
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.0150 86,600 1,299.00
2 Tukang Aluminium OH 0.1500 97,000 14,550.00
3 Kepala Tukang OH 0.0150 101,000 1,515.00
4 Mandor OH 0.0008 100,000 80.00
Jumlah Harga Tenaga Kerja 17,444.00
B Bahan
1 Kaca Tempered 8 mm m2 1.1000 485,000 533,500.00
2 Sealant tube 0.0500 36,000 1,800.00
Jumlah Harga Bahan 535,300.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 552,744.00
E Overhead + Profit 10.00% 55,274.40
F Harga Satuan Pekerjaan ( D + E ) 608,018.00

PEKERJAAN 1m2 PASANG KACA BENING 10mm


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.0150 86,600 1,299.00
2 Tukang Aluminium OH 0.1500 97,000 14,550.00
3 Kepala Tukang OH 0.0150 101,000 1,515.00
4 Mandor OH 0.0008 100,000 80.00
Jumlah Harga Tenaga Kerja 17,444.00
B Bahan
1 Kaca tempered tebal 10 mm m2 1.1000 408,000 448,800.00
2 Sealant tube 0.0500 36,000 1,800.00
Jumlah Harga Bahan 450,600.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 468,044.00
E Overhead + Profit 10.00% 46,804.40
F Harga Satuan Pekerjaan ( D + E ) 514,848.00

PEKERJAAN 1m2 PASANG KACA TEMPERED 12mm


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.0150 86,600 1,299.00
2 Tukang Kayu OH 0.1500 97,000 14,550.00
3 Kepala Tukang OH 0.0150 101,000 1,515.00
4 Mandor OH 0.0010 100,000 100.00
Jumlah Harga Tenaga Kerja 17,464.00
B Bahan
1 Kaca Tempered Tebal 12mm m2 1.1000 620,000 682,000.00
2 Sealent tube 0.0500 36,000 1,800.00
Jumlah Harga Bahan 683,800.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 701,264.00
E Overhead + Profit 10.00% 70,126.40
F Harga Satuan Pekerjaan ( D + E ) 771,390.00
PEKERJAAN 1 bh PASANG HANDLE PINTU
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.0200 86,600 1,732.00
2 Tukang Aluminium OH 0.2000 97,000 19,400.00
3 Kepala Tukang OH 0.0200 101,000 2,020.00
4 Mandor OH 0.0010 100,000 100.00
Jumlah Harga Tenaga Kerja 23,252.00
B Bahan
1 Handle Pintu unit 1.0000 120,000 120,000.00
Jumlah Harga Bahan 120,000.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 143,252.00
E Overhead + Profit 10.00% 14,325.20
F Harga Satuan Pekerjaan ( D + E ) 157,577.00

PEKERJAAN 1 bh PASANG HANDLE JENDELA


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.0200 86,600 1,732.00
2 Tukang Aluminium OH 0.2000 97,000 19,400.00
3 Kepala Tukang OH 0.0200 101,000 2,020.00
4 Mandor OH 0.0010 100,000 100.00
Jumlah Harga Tenaga Kerja 23,252.00
B Bahan
1 Handle Jendela unit 1.0000 56,000 56,000.00
Jumlah Harga Bahan 56,000.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 79,252.00
E Overhead + Profit 10.00% 7,925.20
F Harga Satuan Pekerjaan ( D + E ) 87,177.00

PEKERJAAN 1 bh PASANG KAIT ANGIN


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.0150 86,600 1,299.00
2 Tukang Aluminium OH 0.1500 97,000 14,550.00
3 Kepala Tukang OH 0.0150 101,000 1,515.00
4 Mandor OH 0.0008 100,000 75.00
Jumlah Harga Tenaga Kerja 17,439.00
B Bahan
1 Kait Angin unit 1.0000 18,000 18,000.00
Jumlah Harga Bahan 18,000.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 35,439.00
E Overhead + Profit 10.00% 3,543.90
F Harga Satuan Pekerjaan ( D + E ) 38,982.00
PEKERJAAN 1 bh PASANG SPRING KNIP
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.0150 86,600 1,299.00
2 Tukang Aluminium OH 0.1500 97,000 14,550.00
3 Kepala Tukang OH 0.0150 101,000 1,515.00
4 Mandor OH 0.0008 100,000 75.00
Jumlah Harga Tenaga Kerja 17,439.00
B Bahan
1 Spring Knip unit 1.0000 14,000 14,000.00
Jumlah Harga Bahan 14,000.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 31,439.00
E Overhead + Profit 10.00% 3,143.90
F Harga Satuan Pekerjaan ( D + E ) 34,582.00

PEKERJAAN 1 bh PASANG ENGSEL JENDELA


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.0150 86,600 1,299.00
2 Tukang Aluminium OH 0.1500 97,000 14,550.00
3 Kepala Tukang OH 0.0150 101,000 1,515.00
4 Mandor OH 0.0008 100,000 75.00
Jumlah Harga Tenaga Kerja 17,439.00
B Bahan
1 Engsel Jendela unit 1.0000 65,000 65,000.00
Jumlah Harga Bahan 65,000.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 82,439.00
E Overhead + Profit 10.00% 8,243.90
F Harga Satuan Pekerjaan ( D + E ) 90,682.00

PEKERJAAN PASANG 1 m2 MULTIPLEK 5mm


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.2400 86,600 20,784.00
2 Tukang Kayu OH 0.3700 98,000 36,260.00
3 Kepala Tukang OH 0.0370 106,000 3,922.00
4 Mandor OH 0.0012 100,000 120.00
Jumlah Harga Tenaga Kerja 61,086.00
B Bahan
1 Multiplek 5mm lbr 0.7280 94,300 68,650.40

Jumlah Harga Bahan 68,650.40


C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 129,736.40
E Overhead + Profit 10.00% 12,973.64
F Harga Satuan Pekerjaan ( D + E ) 142,710.00
PEKERJAAN P1 (PINTU UTAMA)
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 1.0000 86,600 86,600.00
2 Tukang Aluminium OH 1.0000 97,000 97,000.00
3 Kepala Tukang OH 0.1000 101,000 10,100.00
4 Mandor OH 0.1000 100,000 10,000.00
Jumlah Harga Tenaga Kerja 203,700.00
B Bahan
1 Kaca Pintu Tempered 12mm m2 4.6000 701,264 3,225,814.40

Accecories Pintu tempered


1 Floor Hinges Set 1.0000 1,750,000 1,750,000.00
2 Overpanel Set 1.0000 980,000 980,000.00
3 Top Patch Fitting Set 1.0000 875,000 875,000.00
4 Bottom Patch Fitting Set 1.0000 875,000 875,000.00
5 Bottom Patch Lock + Cylinder Set 1.0000 1,350,000 1,350,000.00
6 Pull Handle (45cm) Set 2.0000 548,400 1,096,800.00

Jumlah Harga Bahan 10,152,614.40


C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 10,356,314.40
E Overhead + Profit 10.00% 1,035,631.44
F Harga Satuan Pekerjaan ( D + E ) 11,391,945.00

PEKERJAAN P2 (BALAI NIKAH)


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.0430 86,600 3,723.80
2 Tukang Aluminium OH 0.0430 97,000 4,171.00
3 Kepala Tukang OH 0.0043 101,000 434.30
4 Mandor OH 0.0021 100,000 210.00
Jumlah Harga Tenaga Kerja 8,539.10
B Bahan
1 Kusen Aluminium m' 7.7800 50,642 393,995.80
2 kaca bening 5mm m2 1.9695 162,264 319,578.95
3 Aksesoris dll ls 1.0000 570,860 570,859.80
Jumlah Harga Bahan 1,284,434.54
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 1,292,973.64
E Overhead + Profit 10.00% 129,297.36
F Harga Satuan Pekerjaan ( D + E ) 1,422,271.00
PEKERJAAN P3
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.0430 86,600 3,723.80
2 Tukang Aluminium OH 0.0430 97,000 4,171.00
3 Kepala Tukang OH 0.0043 101,000 434.30
4 Mandor OH 0.0021 100,000 210.00
Jumlah Harga Tenaga Kerja 8,539.10
B Bahan
1 Kusen Aluminium m' 6.8000 50,642 344,366.51
2 kaca bening 5mm m2 1.5436 162,264 250,470.71
3 Aksesoris dll ls 1.0000 475,870 475,869.77
Jumlah Harga Bahan 1,070,706.99
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 1,079,246.09
E Overhead + Profit 10.00% 107,924.61
F Harga Satuan Pekerjaan ( D + E ) 1,187,170.00

PEKERJAAN P4
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.0430 86,600 3,723.80
2 Tukang Aluminium OH 0.0430 97,000 4,171.00
3 Kepala Tukang OH 0.0043 101,000 434.30
4 Mandor OH 0.0021 100,000 210.00
Jumlah Harga Tenaga Kerja 8,539.10
B Bahan
1 Kusen Aluminium m' 1.7520 50,642 88,725.02
2 Multiplek 5mm lbr 1.3804 129,736 179,088.13
3 Aksesoris dll ls 1.0000 214,251 214,250.52
4 Finishing Cat m2 1.3804 24,258 33,486.30
Jumlah Harga Bahan 515,549.95
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 524,089.05
E Overhead + Profit 10.00% 52,408.91
F Harga Satuan Pekerjaan ( D + E ) 576,497.00

PEKERJAAN P5 (Pintu Toilet)


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.0430 86,600 3,723.80
2 Tukang Aluminium OH 0.0430 97,000 4,171.00
3 Kepala Tukang OH 0.0043 101,000 434.30
4 Mandor OH 0.0021 100,000 210.00
Jumlah Harga Tenaga Kerja 8,539.10
B Bahan
1 Wadja Door + Kusen bh 1.0000 950,000 950,000.00

Jumlah Harga Bahan 950,000.00


C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 958,539.10
E Overhead + Profit 10.00% 95,853.91
F Harga Satuan Pekerjaan ( D + E ) 1,054,393.00
PEKERJAAN P6 (Pintu Shaft)
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.0430 86,600 3,723.80
2 Tukang Aluminium OH 0.0430 97,000 4,171.00
3 Kepala Tukang OH 0.0043 101,000 434.30
4 Mandor OH 0.0021 100,000 210.00
Jumlah Harga Tenaga Kerja 8,539.10
B Bahan
1 Pintu aluminium + Kusen unit 1.0000 480,000 480,000.00

Jumlah Harga Bahan 480,000.00


C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 488,539.10
E Overhead + Profit 10.00% 48,853.91
F Harga Satuan Pekerjaan ( D + E ) 537,393.00

PEKERJAAN J1
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga

Jumlah Harga Tenaga Kerja -


B Bahan
1 Kusen Allumunium m' 7.8600 48,809 383,637.17
2 Frame Jendela Aluminium m' 1.5456 116,735 180,425.62
3 Kaca bening 5 mm m2 1.0032 162,264 162,783.24
4 handle Jendela bh 4.0000 79,252 317,008.00
5 Kait Angin bh 2.0000 35,439 70,878.00
6 Engsel jendela bh 3.0000 82,439 247,317.00

Jumlah Harga Bahan 1,362,049.03


C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 1,362,049.03
E Overhead + Profit 10.00% 136,204.90
F Harga Satuan Pekerjaan ( D + E ) 1,498,253.00

PEKERJAAN J2
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga

Jumlah Harga Tenaga Kerja -


B Bahan
1 Kusen Allumunium m' 2.6400 48,809 128,855.23
2 Frame Jendela m' 0.7728 116,735 90,212.81
3 Kaca bening 5 mm m2 0.5016 162,264 81,391.62
4 handle Jendela bh 2.0000 79,252 158,504.00
5 Kait Angin bh 1.0000 35,439 35,439.00
6 Engsel jendela bh 2.0000 82,439 164,878.00

Jumlah Harga Bahan 659,280.66


C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 659,280.66
E Overhead + Profit 10.00% 65,928.07
F Harga Satuan Pekerjaan ( D + E ) 725,208.00
PEKERJAAN BV
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga

Jumlah Harga Tenaga Kerja -


B Bahan
1 Kusen Allumunium m' 0.2368 48,809 11,557.92
2 Frame Jendela m' 0.2072 116,735 24,187.49
3 Kaca bening 5 mm m2 0.1100 162,264 17,849.04
4 handle Jendela bh 1.0000 79,252 79,252.00
5 Kait Angin bh 1.0000 35,439 35,439.00
6 Engsel jendela bh 2.0000 82,439 164,878.00

Jumlah Harga Bahan 333,163.46


C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 333,163.46
E Overhead + Profit 10.00% 33,316.35
F Harga Satuan Pekerjaan ( D + E ) 366,479.00

PEKERJAAN 1m' HAND RAILING PIPA STAINLESS 2"


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.1800 86,600 15,588.00
2 Tukang Besi OH 0.1080 97,000 10,476.00
3 Kepala Tukang OH 0.0180 101,000 1,818.00
4 Mandor OH 0.0050 100,000 500.00
Jumlah Harga Tenaga Kerja 28,382.00
B Bahan
1 Pipa stainless 2" m' 1.0500 62,500 65,625.00
2 alat bantu & las ls 1.0000 21,875 21,875.00
Jumlah Harga Bahan 87,500.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 115,882.00
E Overhead + Profit 10.00% 11,588.20
F Harga Satuan Pekerjaan ( D + E ) 127,470.00

PEKERJAAN PASANG LETTER HURUF 17cm


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.0630 86,600 5,455.80
2 Tukang Aluminium OH 0.5500 97,000 53,350.00
3 Kepala Tukang OH 0.0100 101,000 1,010.00
4 Mandor OH 0.0150 100,000 1,500.00
Jumlah Harga Tenaga Kerja 61,315.80
B Bahan
1 Letter 17cm cm 17.0000 4,500 76,500.00
Jumlah Harga Bahan 76,500.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 137,815.80
E Overhead + Profit 10.00% 13,781.58
F Harga Satuan Pekerjaan ( D + E ) 151,597.00
PEKERJAAN PASANG LETTER HURUF 11cm
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.0630 86,600 5,455.80
2 Tukang Aluminium OH 0.5500 97,000 53,350.00
3 Kepala Tukang OH 0.0100 101,000 1,010.00
4 Mandor OH 0.0150 100,000 1,500.00
Jumlah Harga Tenaga Kerja 61,315.80
B Bahan
1 Letter 11cm cm 11.0000 4,500 49,500.00
Jumlah Harga Bahan 49,500.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 110,815.80
E Overhead + Profit 10.00% 11,081.58
F Harga Satuan Pekerjaan ( D + E ) 121,897.00

PASANG LOGO FASAD


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.0630 86,600 5,455.80
2 Tukang Aluminium OH 0.0550 97,000 5,335.00
3 Kepala Tukang OH 0.0100 101,000 1,010.00
4 Mandor OH 0.0150 100,000 1,500.00
Jumlah Harga Tenaga Kerja 13,300.80
B Bahan
1 Logo stainless steel bh 1.0000 725,000 725,000.00

Jumlah Harga Bahan 725,000.00


C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 738,300.80
E Overhead + Profit 10.00% 73,830.08
F Harga Satuan Pekerjaan ( D + E ) 812,130.00

Pemasangan Closet Duduk + Jetwasher


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.1000 86,600 8,660.00
2 Tukang OH 0.1500 96,000 14,400.00
3 Kepala Tukang OH 0.0100 101,000 1,010.00
4 Mandor OH 0.0010 100,000 100.00
Jumlah Harga Tenaga Kerja 24,170.00
B Bahan
1 Closet Duduk Toto + Jetwasher bh 1.0000 1,344,000 1,344,000.00
2 Perlengkapan ls 1.0000 336,000 336,000.00

Jumlah Harga Bahan 1,680,000.00


C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 1,704,170.00
E Overhead + Profit 10.00% 170,417.00
F Harga Satuan Pekerjaan ( D + E ) 1,874,587.00
Pemasangan washtafel
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 1.2000 86,600 103,920.00
2 Tukang OH 1.4500 96,000 139,200.00
3 Kepala Tukang OH 0.1500 101,000 15,150.00
4 Mandor OH 0.0600 100,000 6,000.00
Jumlah Harga Tenaga Kerja 264,270.00
B Bahan
1 Wasthtafel bh 1.0000 555,000 555,000.00
2 semen porland kg 6.0000 1,275 7,650.00
3 pasir pasang m3 0.0100 275,000
Jumlah Harga Bahan 562,650.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 826,920.00
E Overhead + Profit 10.00% 82,692.00
F Harga Satuan Pekerjaan ( D + E ) 909,612.00

Pemasangan Kirchen Sink


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.1000 86,600 8,660.00
2 Tukang OH 0.1500 96,000 14,400.00
3 Kepala Tukang OH 0.0100 101,000 1,010.00
4 Mandor OH 0.0010 100,000 100.00
Jumlah Harga Tenaga Kerja 24,170.00
B Bahan
1 Kitchen Sink bh 1.0000 516,000 516,000.00
2 seal tape bh 0.2500 1,275 318.75

Jumlah Harga Bahan 516,318.75


C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 540,488.75
E Overhead + Profit 10.00% 54,048.88
F Harga Satuan Pekerjaan ( D + E ) 594,537.00

Pemasangan kran air washtafel


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.1000 86,600 8,660.00
2 Tukang OH 0.1500 96,000 14,400.00
3 Kepala Tukang OH 0.0100 101,000 1,010.00
4 Mandor OH 0.0010 100,000 100.00
Jumlah Harga Tenaga Kerja 24,170.00
B Bahan
1 kran air washtafel bh 1.0000 196,000 196,000.00
2 seal tape bh 0.2500 5,500 1,375.00

Jumlah Harga Bahan 197,375.00


C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 221,545.00
E Overhead + Profit 10.00% 22,154.50
F Harga Satuan Pekerjaan ( D + E ) 243,699.00
Pemasangan kran air Kitchen Sink
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.1000 86,600 8,660.00
2 Tukang OH 0.1500 96,000 14,400.00
3 Kepala Tukang OH 0.0100 101,000 1,010.00
4 Mandor OH 0.0010 100,000 100.00
Jumlah Harga Tenaga Kerja 24,170.00
B Bahan
1 kran air washtafel bh 1.0000 239,000 239,000.00
2 seal tape bh 0.2500 5,500 1,375.00

Jumlah Harga Bahan 240,375.00


C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 264,545.00
E Overhead + Profit 10.00% 26,454.50
F Harga Satuan Pekerjaan ( D + E ) 290,999.00

A.5.1.1.35. Pemasangan 1 buah Kran Diameter ½” atau ¾ ”


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.1000 86,600 8,660.00
2 Tukang OH 0.1500 96,000 14,400.00
3 Kepala Tukang OH 0.0100 101,000 1,010.00
4 Mandor OH 0.0010 100,000 100.00
Jumlah Harga Tenaga Kerja 24,170.00
B Bahan
1 Kran 1/2" bh 1.0000 165,000 165,000.00
2 seal tape bh 0.2500 5,500 1,375.00

Jumlah Harga Bahan 166,375.00


C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 190,545.00
E Overhead + Profit 10.00% 19,054.50
F Harga Satuan Pekerjaan ( D + E ) 209,599.00

A.5.1.1.36 Pemasangan Floor Drain


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.1000 86,600 8,660.00
2 Tukang OH 0.1500 96,000 14,400.00
3 Kepala Tukang OH 0.0100 101,000 1,010.00
4 Mandor OH 0.0010 100,000 100.00
Jumlah Harga Tenaga Kerja 24,170.00
B Bahan
1 Floor Drain bh 1.0000 249,000 249,000.00

Jumlah Harga Bahan 249,000.00


C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 273,170.00
E Overhead + Profit 10.00% 27,317.00
F Harga Satuan Pekerjaan ( D + E ) 300,487.00
Pemasangan Roof Drain
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.1000 86,600 8,660.00
2 Tukang OH 0.1500 96,000 14,400.00
3 Kepala Tukang OH 0.0100 101,000 1,010.00
4 Mandor OH 0.0010 100,000 100.00
Jumlah Harga Tenaga Kerja 24,170.00
B Bahan
1 Roof Drain bh 1.0000 275,000 275,000.00

Jumlah Harga Bahan 275,000.00


C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 299,170.00
E Overhead + Profit 10.00% 29,917.00
F Harga Satuan Pekerjaan ( D + E ) 329,087.00

PEMASANGAN 1 m2 GRANIT DINDING MOTIF MARMER 60x60 POLISHED


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.2400 86,600 20,784.00
2 Tukang Batu OH 0.1200 96,000 11,520.00
3 Kepala Tukang OH 0.0120 101,000 1,212.00
4 Mandor OH 0.0120 100,000 1,200.00
Jumlah Harga Tenaga Kerja 34,716.00
B Bahan
1 Granit Dinding 60x60 Polished m2 1.0600 256,000 271,360.00
2 Semen Pc kg 9.3000 1,275 11,857.50
3 Pasir Pasang m3 0.0180 215,000 3,870.00
4 Semen Warna kg 0.2500 15,700 3,925.00
Jumlah Harga Bahan 291,012.50
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 325,728.50
E Overhead + Profit 10.00% 32,572.85
F Harga Satuan Pekerjaan ( D + E ) 358,301.00

PEKERJAAN PASANG ORNAMEN FASAD GRC + RANGKA DAN PENGECATAN


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.0500 86,600 4,330.00
2 Tukang Kayu OH 0.1000 98,000 9,800.00
3 Kepala Tukang OH 0.0500 106,000 5,300.00
4 Mandor OH 0.0050 100,000 500.00
Jumlah Harga Tenaga Kerja 19,930.00
B Bahan
1 Rangka Hollow 40x40 t 2mm m2 1.1000 45,000 49,500.00
2 GRC Cetak Motif, t:4cm m2 1.1000 450,000 495,000.00
3 Semen PC kg 1.5000 1,275 1,912.50
4 Cat GRC m2 1.0000 57,439 57,439.40
Jumlah Harga Bahan 603,851.90
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 623,781.90
E Overhead + Profit 10.00% 62,378.19
F Harga Satuan Pekerjaan ( D + E ) 686,160.00
PEKERJAAN PASANG ORNAMEN LISTPLANK GRC
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.0500 86,600 4,330.00
2 Tukang Kayu OH 0.1000 98,000 9,800.00
3 Kepala Tukang OH 0.0500 106,000 5,300.00
4 Mandor OH 0.0050 100,000 500.00
Jumlah Harga Tenaga Kerja 19,930.00
B Bahan
1 Ornamen Listplank Beton m' 1.1000 205,000 225,500.00
2 Semen PC kg 1.5000 1,275 1,912.50
3 Perkuatan ls 1.0000 34,112 34,111.88
Jumlah Harga Bahan 261,524.38
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 281,454.38
E Overhead + Profit 10.00% 28,145.44
F Harga Satuan Pekerjaan ( D + E ) 309,599.00

Pasang Backdrop Multiplek 9 mm 1 sisi Rangka Kayu


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.3000 86,600 25,980.00
2 Tukang Kayu OH 0.5000 98,000 49,000.00
3 Kepala Tukang OH 0.0370 106,000 3,922.00
4 Mandor OH 0.0150 100,000 1,500.00
Jumlah Harga Tenaga Kerja 80,402.00
B Bahan
1 Rangka Kayu m3 0.0048 1,920,000 9,216.00
2 multiplex 9 mm lbr 0.3600 149,500 53,820.00
3 wood feller kg 0.4500 7,000 3,150.00
4 Paku skrup kg 0.2500 23,500 5,875.00
Jumlah Harga Bahan 72,061.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 152,463.00
E Overhead + Profit 10.00% 15,246.30
F Harga Satuan Pekerjaan ( D + E ) 167,709.00

Pasang Backdrop Multiplek 9 mm Perforated 1 sisi Rangka Kayu


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.3000 86,600 25,980.00
2 Tukang Kayu OH 0.5000 98,000 49,000.00
3 Kepala Tukang OH 0.0370 106,000 3,922.00
4 Mandor OH 0.0150 100,000 1,500.00
Jumlah Harga Tenaga Kerja 80,402.00
B Bahan
1 Rangka Kayu m3 0.0048 1,920,000 9,216.00
2 multiplex 9 mm perforated lbr 0.3600 149,500 53,820.00
3 wood feller kg 0.4500 7,000 3,150.00
4 Paku skrup kg 0.2500 23,500 5,875.00
5 Finishing Cat Duco m2 1.1000 68,710 75,581.00
Jumlah Harga Bahan 147,642.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 228,044.00
E Overhead + Profit 10.00% 22,804.40
F Harga Satuan Pekerjaan ( D + E ) 250,848.00
memasang HPL backdrop m2
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.3000 86,600 25,980.00
2 Tukang Kayu OH 0.5000 98,000 49,000.00
3 Kepala Tukang OH 0.0370 106,000 3,922.00
4 Mandor OH 0.0150 100,000 1,500.00
Jumlah Harga Tenaga Kerja 80,402.00
B Bahan
1 HPL lbr 0.3800 255,000 96,900.00
2 Lem Kayu bh 0.3000 17,500 5,250.00

Jumlah Harga Bahan 102,150.00


C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 182,552.00
E Overhead + Profit 10.00% 18,255.20
F Harga Satuan Pekerjaan ( D + E ) 200,807.00

PEKERJAAN PASANG LETTER HURUF 7cm


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.0630 86,600 5,455.80
2 Tukang Aluminium OH 0.5500 97,000 53,350.00
3 Kepala Tukang OH 0.0100 101,000 1,010.00
4 Mandor OH 0.0150 100,000 1,500.00
Jumlah Harga Tenaga Kerja 61,315.80
B Bahan
1 Letter 7cm cm 7.0000 4,500 31,500.00
Jumlah Harga Bahan 31,500.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 92,815.80
E Overhead + Profit 10.00% 9,281.58
F Harga Satuan Pekerjaan ( D + E ) 102,097.00

PENGECATAN 1 m2 Cat Duco


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.0700 86,600 6,062.00
2 Tukang Cat OH 0.0090 90,000 810.00
3 Kepala Tukang OH 0.0060 98,000 588.00
4 Mandor OH 0.0030 100,000 300.00
Jumlah Harga Tenaga Kerja 7,760.00
B Bahan
1 Cat Menie kg 0.2000 57,500 11,500
2 Cat Dasar kg 0.1700 115,000 19,550
3 Cat Duco kg 0.2600 115,000 29,900

Jumlah Harga Bahan 60,950.00


C Peralatan

Jumlah Harga Peralatan -


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 68,710.00
E Overhead + Profit 10.00% 6,871.00
F Harga Satuan Pekerjaan ( D + E ) 75,581.00

PASANG LOGO BACKDROP


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.0630 86,600 5,455.80
2 Tukang Aluminium OH 0.0550 97,000 5,335.00
3 Kepala Tukang OH 0.0100 101,000 1,010.00
4 Mandor OH 0.0150 100,000 1,500.00
Jumlah Harga Tenaga Kerja 13,300.80
B Bahan
1 Logo stainless steel bh 1.0000 310,000 310,000.00

Jumlah Harga Bahan 310,000.00


C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 323,300.80
E Overhead + Profit 10.00% 32,330.08
F Harga Satuan Pekerjaan ( D + E ) 355,630.00

Compound plat beton 1m2


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.1000 86,600 8,660.00
2 Tukang Cat OH 0.0500 90,000 4,500.00
3 Kepala Tukang OH 0.0050 98,000 490.00
4 Mandor OH 0.0050 100,000 500.00
Jumlah Harga Tenaga Kerja 14,150.00
B Bahan
1 Tepung gypsum kg 0.4500 4,500 2,025.00
2 Alkasit kg 0.0030 24,000 72.00

Jumlah Harga Bahan 2,097.00


C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 16,247.00
E Overhead + Profit 10.00% 1,624.70
F Harga Satuan Pekerjaan ( D + E ) 17,871.00

PEKERJAAN 1m2 Railing Tangga Rangka Hollow


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.2500 86,600 21,650.00
2 Tukang Besi OH 0.2500 97,000 24,250.00
3 Kepala Tukang OH 0.0250 101,000 2,525.00
4 Mandor OH 0.0130 100,000 1,300.00
Jumlah Harga Tenaga Kerja 49,725.00
B Bahan
1 Rangka Hollow 40x40 t 2mm m' 1.1000 45,000 49,500.00
2 Rangka Hollow 20x20 m' 1.1000 15,833 17,416.67
3 Assesoris (perkuatan, las, pengecatan dll) ls 1.0000 30,113 30,112.50
Jumlah Harga Bahan 97,029.17
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 146,754.17
E Overhead + Profit 10.00% 14,675.42
F Harga Satuan Pekerjaan ( D + E ) 161,429.00
PEKERJAAN PASANG 1 m2 ROSTER BETON + FINISHING CAT
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.3000 86,600 25,980.00
2 Tukang Batu OH 0.1000 96,000 9,600.00
3 Kepala Tukang OH 0.0100 101,000 1,010.00
4 Mandor OH 0.0150 100,000 1,500.00
Jumlah Harga Tenaga Kerja 38,090.00
B Bahan
1 Pasir Pasang m' 0.0320 215,000 6,880.00
2 Semen PC kg 14.0000 1,275 17,850.00
3 Roster Beton bh 30.0000 15,000 450,000.00

Jumlah Harga Bahan 474,730.00


C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 512,820.00
E Overhead + Profit 10.00% 51,282.00
F Harga Satuan Pekerjaan ( D + E ) 564,102.00

PEKERJAAN LIST PROFIL BETON 1m'


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.0500 86,600 4,330.00
2 Tukang Batu OH 0.1000 96,000 9,600.00
3 Kepala Tukang OH 0.0500 101,000 5,050.00
4 Mandor OH 0.0050 100,000 500.00
Jumlah Harga Tenaga Kerja 19,480.00
B Bahan
1 List Profil Beton m' 1.1000 35,000 38,500.00
2 Semen PC kg 1.5000 1,275 1,912.50
3 Cat List Beton m2 1.0000 57,439 57,439.40
Jumlah Harga Bahan 97,851.90
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 117,331.90
E Overhead + Profit 10.00% 11,733.19
F Harga Satuan Pekerjaan ( D + E ) 129,065.00

Pemasangan 1 m2 Langit-langit GRC tebal 4 mm, rangka hollow


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja OH 0.2400 86,600 20,784.00
2 Tukang kayu OH 0.3700 98,000 36,260.00
3 Kepala tukang kayu OH 0.0370 106,000 3,922.00
4 Mandor OH 0.0120 100,000 1,200.00
Jumlah Harga Tenaga Kerja 62,166.00
B Bahan
1 Rangka hollow 4x4 cm m1 2.0000 9,000 18,000.00
2 Rangka hollow 2x4 cm m1 2.5000 3,500 8,750.00
3 Papan GRC 4 mm lbr 0.3600 120,000 43,200.00
4 Kasa gypsum roll 0.0500 13,500 675.00
5 Tepung gypsum kg 0.4500 4,500 2,025.00
6 Alkasit kg 0.0030 24,000 72.00
7 Paku skrup bh 12.0000 700 8,400.00
8 Kawat penggantung m1 5.0000 1,000 5,000.00
Jumlah Harga Bahan 86,122.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 148,288.00
E Overhead + Profit 10.00% 14,828.80
F Harga Satuan Pekerjaan ( D + E ) 163,117.00
No E- URAIAN PEKERJAAN VOLUME SATUAN HARGA SATUAN JUMLAH
Katalog NO
PEKERJAAN PERSIAPAN / SITEWORK
1 1 Pek. Papan Nama Proyek 1 unit 205,451 205,451
2 2 Pembersihan Lahan dan Removal 1 ls 3,000,000 3,000,000
3 3 Pengukuran dan Pemasangan 1 m1 Bouwplank 1 ls 2,500,000 2,500,000
4 4 Pembuatan 1 m1 Pagar Sementara dari Seng Gelombang 7.35 m1 295,365 2,170,933
JUMLAH 7,876,384
PENERAPAN SMKK
5 1 Asuransi (Construction All Risk/CAR) 1 ls 5,000,000 5,000,000
6 2 Pembuatan Dokumen RKK, RKPPL, RMLLP, RMPK 3 set 250,000 750,000
7 3 Pembuatan Prosedur dan Instruksi Kerja 5 bh 10,000 50,000
8 4 Pertemuan keselamatan (Safety Talk dan/atau Tool Box 1 ls 750,000 750,000
9 5 Meeting)
Topi Pelindung (Safety Helmet) 5 bh 60,850 304,250
10 6 Sarung Tangan (Safety Gloves) 10 psng 30,000 300,000
11 7 Sepatu Keselamatan (Safety Shoes, Rubber Safety Shoes 10 psng 225,000 2,250,000
12 8 and
RompiToe Cap)
keselamatan (Safety Vest) 5 bh 50,000 250,000
13 9 Penunjang seluruh tubuh (Full Body Harness) 5 unit 128,000 640,000
14 10 Jaring Pengaman (Safety Net) 1 ls 1,000,000 1,000,000
15 11 Peralatan P3K 1 unit 750,000 750,000
16 12 Rambu Petunjuk 3 bh 200,000 600,000
139 13 Rambu Peringatan 3 bh 200,000 600,000
17 14 Rambu Pekerjaan Sementara 3 bh 200,000 600,000
JUMLAH 13,844,250
PEKERJAAN GEDUNG KEAGAMAAN DAN PENDIDIKAN
KEMENTERIAN
PEKERJAAN TANAHAGAMA
18 1 Penggalian tanah biasa sedalam >1 s.d. 2 m 109.15 m3 71,725 7,828,812
19 2 Pengurugan kembali galian tanah 58.39 m3 75,130 4,386,898
20 3 Pengurugan dengan pasir urug 14.04 m3 313,478 4,401,756
21 4 Pekerjaan Timbunan dan Pemadatan Tanah 44.33 m3 54,664 2,423,240
Timbunan
22 5 Pekerjaan Pengurugan dengan Tanah Timbunan 16.71 m3 178,706 2,985,332
Pilihan
JUMLAH 22,026,039
PEKERJAAN STRUKTUR
23 1 Pembuatan 1 m3 lantai kerja beton mutu fc 7.4 Mpa 3.21 m3 890,170 2,854,019
24 2 Pondasi Siklop Beton K-250 60% - 40% Batu Belah 8.70 m3 557,020 4,846,076
25 3 Pembuatan 1 m3 Beton Mutu f’c = 24.0 Mpa (K275) 63.02 m3 901,175 56,788,498
26 4 Pembesian 1 Kg dengan besi polos/ulir 10807.29 kg 14,042 151,756,041
27 5 Pemasangan 1 m2 Bekisting untuk Pondasi Telapak 21.12 m2 109,756 2,318,047
28 6 Beton Bangunan
Pemasangan Gedung
1 m2 Bekisting untuk Sloof Beton 45.71 m2 167,912 7,674,922
Bangunan Gedung
29 7 Pemasangan 1 m2 Bekisting untuk Kolom Beton 135.51 m2 159,092 21,558,557
Bangunan Gedung
30 8 Pemasangan pondasi batu belah 1PC:4PP 20.24 m3 792,108 16,035,434
31 9 Sloof Praktis 44.21 m1 98,965 4,375,243
32 10 Kolom Praktis 150.81 m1 77,152 11,635,293
33 11 Pemasangan 1 m2 Bekisting untuk Balok Bangunan 246.14 m2 162,260 39,939,325
Gedung
34 12 Ring Balk 37.00 m1 98,965 3,661,705
35 13 Balok Latei 79.39 m1 98,965 7,856,831
36 14 Pemasangan 1 m2 Bekisting untuk Plat lantai Beton 187.87 m2 203,092 38,154,325
Bangunan Gedung
37 15 Pembuatan 1 m3 Beton Mutu f’c = 14.5 Mpa (K175) 2.50 m3 966,351 2,411,857
38 16 Pemasangan 1 m2 Bekisting untuk Plat Topi Topi Beton 21.53 m2 135,395 2,915,047
Bangunan Gedung
39 17 Pemasangan 1 m2 Bekisting untuk Tangga Beton 12.97 m2 150,100 1,947,091
Bangunan Gedung
40 18 Pembuatan 1 m3 Beton Mutu f’c = 16.9 Mpa (K200) 4.46 m3 906,367 4,041,998
JUMLAH 380,770,309
PEKERJAAN DINDING
41 1 Pemasangan 1m2 dinding bata ringan tebal 10cm 394.67 m2 164,913 65,086,708
dengan mortar siap pakai
42 2 Pekerjaan Plesteran Dengan Mortar Siap Pakai 1,009.53 m2 59,495 60,061,868
43 3 Pemasangan 1 M2 Acian 1,099.42 m2 26,834 29,501,742
44 4 Pekerjaan Skoning Dengan Mortar Siap Pakai 352.11 m1 33,981 11,965,050
45 5 Pasang Dinding Partisi Gypsum 2 sisi + Rangka Kayu dan 27.60 m2 238,303 6,577,163
46 6 Finishing Cat Type
Pasang Dinding 1 Gypsum 2 sisi + Rangka Kayu dan
Partisi 26.28 m2 263,603 6,927,487
47 7 Finishing Cat Type
Pasang Kaca Es 2 4.06 m2 345,690 1,403,156
JUMLAH 181,523,174
PEKERJAAN LANTAI
48 1 Pasang Lantai Vinyl uk. 15cm x 80cm t ; 5mm 55.74 m2 265,668 14,809,530
49 2 Pasang Lantai Keramik 60cm x 60cm Polished 104.27 m2 207,697 21,656,712
50 3 Pasang Lantai Keramik 60cm x 60cm Unpolished 36.20 m2 217,861 7,886,677
51 4 Pasang Lantai Keramik Tile 40cm x 40cm Anti selip 9.36 m2 181,561 1,699,411
52 5 Pasang Keramik Dinding 20cm x 40cm Polished, Kamar Mandi 36.28 m2 161,668 5,864,992
53 6 Pasang Listello keramik 10cm x 20 cm, kamar Mandi 21.34 m1 43,424 926,668
54 7 Pasang Stepnoshing Tangga Sampai Lt 2 24.00 m1 67,746 1,625,904
55 8 Pasang Plint Keramik 10cm x 60cm 53.18 m1 68,292 3,631,769
JUMLAH 58,101,662
PEKERJAAN PINTU
56 1 Pemasangan Pintu Utama 1.00 unit 11,391,945 11,391,945
57 2 (tahan
Pasangapi)
Pintu Aluminium Ruang Balai Nikah 1.00 unit 1,422,271 1,422,271
58 3 Pemasangan Pintu Ruangan 6.00 unit 1,187,170 7,123,020
59 4 Pasang Pintu Ruang Laktasi 1.00 unit 576,497 576,497
60 5 Pemasangan 1 m2 Pintu UPVC 4.00 unit 1,054,393 4,217,572
61 6 Pasang Pintu Shaft 2.00 unit 537,393 1,074,786
62 7 Pasang Jendela Aluminium J1 ( Lengkap aksesoris, handle, 14.00 unit 1,498,253 20,975,542
63 8 dll )
Pasang Jendela Aluminium J2 ( Lengkap aksesoris, handle, 2.00 unit 725,208 1,450,416
64 9 dll )
Pasang Boven Aluminium ( Lengkap dengan aksesoris, handle, 5.00 unit 366,479 1,832,395
65 10 dll )
Pasang Roster 0.12 m2 564,102 67,692
JUMLAH 50,132,136
PEKERJAAN PLAFOND
66 1 Pasang Plafond PVC + Rangka Hollow 211.07 m2 234,536 49,502,927
67 2 Pasang Upceiling Plafond PVC + Rangka Hollow 30.18 m1 176,737 5,333,923
68 3 Pemasangan 1 m’ List Langit- Langit PVC 164.34 m1 30,432 5,001,195
69 4 Plafond GRC Tritisan + Rangka Hollow 35.73 m2 163,117 5,827,844
JUMLAH 65,665,889
PEKERJAAN PENUTUP ATAP
70 1 Pemasangan 1 m2 Atap Jurai/Limasan Rangka Atap 117.87 m2 299,601 35,313,071
Baja Ringan (Canai Dingin) Profil C75Baja Ringan (Canai
Dingin) Profil C75
71 2 Pemasangan 1 m2 Genteng Beton 117.87 m2 176,203 20,768,519
72 3 Pemasangan 1 m’ Nok/Bubung Genteng Beton 23.76 m1 140,621 3,341,155
73 4 Pemasangan 1 M' Lisplank Ukuran (1.8 x 20) cm, 44.20 m1 68,862 3,043,700
Woodplank/Kalsiplank
JUMLAH 62,466,445
PEKERJAAN PENGECETAN
74 1 Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis 470.20 m2 26,355 12,392,147
cat dasar, 2 lapis cat penutup) Interior

75 2 Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis 342.54 m2 63,183 21,643,002


cat dasar, 2 lapis cat penutup) Eksterior
76 3 Cat Coumpound Bawah Tangga 2.24 m2 17,871 40,067
77 4 1 M2 Pengecatan Bidang Kayu Baru (1 lapis plamur, 1 6.63 m2 53,515 354,804
lapis cat dasar, 2 lapis cat penutup)

78 5 Cat Plafond GRC 35.73 m2 26,684 953,366


79 6 1 M2 Memasang Waterproofing Coating 63.48 m2 61,670 3,915,058
JUMLAH 39,298,445
PEKERJAAN LAINNYA
80 1 Pasang Hand Railing, Pipa Stainless Diameter 2 Inchi 33.23 m1 127,470 4,235,828
81 2 Pek. Pemasangan 1 m² Relling besi hollow 40.40 mm 5.64 m2 161,429 910,460
82 3 dan 40.10 mm1 M2 Guiding Block 30x30 (Difabel)
Pemasangan 3.96 m2 302,069 1,196,193
1 m2 pekerjaan dinding backdrop multiplek + rangka
83 4 multiplek (tebal maks.10 cm) 35.37 m2 167,709 5,932,431
84 5 Pasang HPL 35.37 m2 200,807 7,103,218
85 6 Signage Tulisan Stainless Steel, ukuran 11cm backdrop 9.00 bh 121,897 1,097,073
86 7 Signage Tulisan Stainless Steel, ukuran 7cm backdrop 35.00 bh 102,097 3,573,395
87 8 Logo Stainless Steel Backdrop 1.00 unit 355,630 355,630
88 9 Pekerjaan Multiplek Perforated Finishing Cat Duco 2.00 m2 250,848 501,696
89 10 Pasang Granit Dinding Motif Marmer 60cm x 60cm Polished 2.96 m2 278,302 824,887
90 11 Signage Tulisan Stainless Steel, ukuran 17cm fasad 55.00 bh 151,597 8,337,835
91 12 Logo Stainless Steel fasad 1.00 unit 812,130 812,130
92 13 1 m2 Pemasangan GRC Ornamen, Cutting GRC. 11.52 m2 686,160 7,904,563
93 14 Pasang Listplank GRC + Rangka dan Pengecatan 42.58 m1 309,599 13,182,725
94 15 Pasang List Profil Beton FD1 + Pengecatan 23.58 m1 129,065 3,043,353
JUMLAH 59,011,417
PEKERJAAN MEP
95 1 Pompa Transfer 1.00 set 2,100,000 2,100,000
96 2 Pompa Booster 1.00 set 2,760,000 2,760,000
97 3 Pemasangan 1 Buah Closet Duduk/Monoblock 4.00 unit 1,874,587 7,498,348
98 4 Pemasangan 1 Buah Wastafel 1.00 unit 909,612 909,612
99 5 Pemasangan 1 buah Kran Diameter ½” atau ¾ ” 5.00 bh 209,599 1,047,995
100 6 Pasang Kran Air Washtafel 1.00 bh 243,699 243,699
101 7 Pemasangan 1 buah Floor Drain 4.00 bh 300,487 1,201,948
102 8 Pemasangan 1 Buah Roof Drain dia. 4" 6.00 bh 329,087 1,974,522
103 9 Stop Kran 1" 2.00 bh 195,712 391,424
104 10 Pemasangan 1 m’ Pipa PVC tipe AW Diameter 1½” 20.00 m1 47,432 948,649
105 11 Pemasangan 1 m’ Pipa PVC tipe AW Diameter 1” 60.00 m1 38,709 2,322,566
106 12 Pemasangan 1 m’ Pipa PVC tipe AW Diameter ¾ ” 20.00 m1 28,384 567,679
107 13 Tangki air Total Drain TD 1.000 Liter (Inklude Instalasi) 1.00 unit 4,500,000 4,500,000
108 14 Pemasangan 1 m’ Pipa PVC tipe AW Diameter 2” 11.00 m1 74,883 823,712
109 15 Pemasangan 1 m’ Pipa PVC tipe AW Diameter 3” 39.00 m1 137,934 5,379,418
110 16 Pemasangan 1 m’ Pipa PVC tipe AW Diameter 4” 40.00 m1 176,564 7,062,576
111 17 Pemasangan 1 m’ Pipa Vent PVC tipe AW Diameter 1” 8.00 m1 47,432 379,460
112 18 Pemasangan 1 m’ Pipa Galvanis Diameter 3” 32.00 m1 152,323 4,874,334
113 19 1 Buah Sumur Resapan 2.00 bh 2,500,000 5,000,000
114 20 Pemasangan 1 buah Bak Kontrol Pasangan Bata 30 x 30 cm 2.00 bh 300,000 600,000
Tinggi 35 cm dengan Tutup Beton
115 21 Biofill BF-03 1.00 unit 6,500,000 6,500,000
22 Pekerjaan Penambahan Daya Listrik PLN
116 23 Biaya Penambahan daya 2,3 KVA ke 7,7 KVA 1.00 ls 6,480,000 6,480,000
117 24 Biaya Pengurusan Ijin 1.00 ls 500,000 500,000
118 25 Panel MDP 1.00 unit 6,528,170 6,528,170
119 26 PANEL SDP 1.00 unit 6,412,670 6,412,670
120 27 KABEL TR, NYY 4 X 25 mm2 15.00 m1 359,178 5,387,669
121 28 KABEL TR, NYY 4 X 16 mm2 15.00 m1 230,478 3,457,169
122 29 Lampu RM SLIM LED PANEL 45W 8.00 bh 806,163 6,449,300
123 30 Lampu Downlight LED, SMART BRIGHT 24W 16.00 bh 322,163 5,154,600
124 31 Lampu Downlight LED, SMART BRIGHT 12W 6.00 bh 304,013 1,824,075
125 32 Lampu Downlight LED, SMART BRIGHT 9W 5.00 bh 243,513 1,217,563
126 33 Saklar Tunggal 9.00 bh 32,753 294,773
127 34 Saklar Ganda 6.00 bh 41,828 250,965
128 35 Titik Instalasi Penerangan 35.00 titik 178,022 6,230,776
129 36 Outletwall stopkontak 13.00 bh 47,878 622,408
130 37 Titik Instalasi Stop Kontak Daya 1 Phase 28.00 bh 243,197 6,809,521
131 38 Instalasi sparing pipa refrigerant + pipa drain 8.00 titik 150,000 1,200,000
132 39 Instalasi stop kontak NYM 3x2,5mm2 8.00 titik 351,822 2,814,577
133 40 Pasang Stop Kontak AC 8.00 bh 126,528 1,012,220
134 41 FIRE EXTINGHUISHER 3 Kg 2.00 unit 1,050,000 2,100,000
135 42 Batang Penangkal Petir / Finial 1.00 bh 4,500,000 4,500,000
136 43 Sertifikat Instalasi dari Disnaker atau yang terkait 1.00 ls 1,500,000 1,500,000
137 44 Kabel BC 70 mm 20.00 m1 120,000 2,400,000
138 45 Grounding Control Box (GCB) 2.00 set 2,280,000 4,560,000
JUMLAH 134,792,397

GRAND TOTAL 1,075,508,547


HARSAT PPN HARSAT Ekatalog Total Ekatalog Stok Produk HARGA TURUN PER ITEM TOTAL HARGA
1% KIRIM KE PPK TURUN 1%
228,051 227,937 227,937 100 225,657 225,657
3,330,000 3,328,335 3,328,335 100 3,295,052 3,295,052
2,775,000 2,773,613 2,773,613 100 2,745,876 2,745,876
327,855 327,691 2,408,530 735 324,414 2,384,445
6,660,906 6,657,575 8,738,415 6,591,000 8,651,030
- -
5,550,000 5,547,225 5,547,225 100 5,491,753 5,491,753
277,500 277,361 832,084 300 274,588 823,763
11,100 11,094 55,472 500 10,984 54,918
832,500 832,084 832,084 100 823,763 823,763
67,544 33,283 166,415 500 32,950 164,751
33,300 67,510 675,100 1,000 66,835 668,349
249,750 249,625 2,496,251 1,000 247,129 2,471,289
55,500 55,472 277,361 500 54,918 274,588
142,080 142,009 710,045 500 140,589 702,944
1,110,000 1,109,445 1,109,445 100 1,098,351 1,098,351
832,500 832,084 832,084 100 823,763 823,763
222,000 221,889 665,667 300 219,670 659,010
222,000 221,889 665,667 300 219,670 659,010
222,000 221,889 665,667 300 219,670 659,010
9,827,774 9,822,860 15,530,567 9,724,631 15,375,261
- -
- -
79,615 79,575 8,685,637 10,915 78,779 8,598,780
83,394 83,353 4,867,022 5,839 82,519 4,818,352
347,961 347,787 4,883,506 1,404 344,309 4,834,671
60,677 60,647 2,688,452 4,433 60,040 2,661,568
198,364 198,264 3,312,061 1,671 196,282 3,278,941

770,010 769,625 24,436,679 761,929 24,192,312


- -
988,089 987,595 3,166,377 321 977,719 3,134,713
618,292 617,983 5,376,454 870 611,803 5,322,690
1,000,304 999,804 63,003,715 6,302 989,806 62,373,678
15,587 15,579 168,364,980 1,080,729 15,423 166,681,331
121,829 121,768 2,571,745 2,112 120,551 2,546,028
186,382 186,289 8,514,904 4,571 184,426 8,429,754
176,592 176,504 23,918,033 13,551 174,739 23,678,853
879,240 878,800 17,790,432 2,024 870,012 17,612,528
109,851 109,796 4,854,091 4,421 108,698 4,805,550
85,639 85,596 12,908,718 15,081 84,740 12,779,631
180,109 180,019 44,310,485 24,614 178,218 43,867,380
109,851 109,796 4,062,460 3,700 108,698 4,021,836
109,851 109,796 8,716,722 7,939 108,698 8,629,555
225,432 225,319 42,330,126 18,787 223,066 41,906,824
1,072,650 1,072,113 2,675,823 250 1,061,392 2,649,065
150,288 150,213 3,234,085 2,153 148,711 3,201,744

166,610 166,527 2,160,190 1,297 164,862 2,138,588

1,006,067 1,005,564 4,484,374 446 995,509 4,439,531


7,202,664 7,199,063 422,443,715 7,127,072 418,219,278
- -
183,053 182,962 72,210,123 39,467 181,132 71,488,022

66,039 66,006 66,635,340 100,953 65,346 65,968,986


29,786 29,771 32,730,561 109,942 29,473 32,403,255
37,719 37,700 13,274,565 35,211 37,323 13,141,819
264,516 264,384 7,297,000 2,760 261,740 7,224,030
292,599 292,453 7,685,666 2,628 289,529 7,608,809
383,716 383,524 1,556,724 406 379,689 1,541,157
1,257,429 1,256,800 201,389,978 1,244,232 199,376,078
- -
294,891 294,744 16,430,359 5,574 291,797 16,266,055
230,544 230,428 24,026,930 10,427 228,124 23,786,661
241,826 241,705 8,749,835 3,620 239,288 8,662,336
201,533 201,432 1,885,403 936 199,418 1,866,549
179,451 179,362 6,506,886 3,628 177,568 6,441,817
48,201 48,177 1,028,087 2,134 47,695 1,017,806
75,198 75,160 1,803,851 2,400 74,409 1,785,813
75,804 75,766 4,029,247 5,318 75,009 3,988,955
1,347,448 1,346,774 64,460,598 1,333,306 63,815,992
- -
12,645,059 12,638,736 12,638,736 100 12,512,349 12,512,349
1,578,721 1,577,931 1,577,931 100 1,562,152 1,562,152
1,317,759 1,317,100 7,902,599 600 1,303,929 7,823,573
639,912 639,592 639,592 100 633,196 633,196
1,170,376 1,169,791 4,679,164 400 1,158,093 4,632,373
596,506 596,208 1,192,416 200 590,246 1,180,492
1,663,061 1,662,229 23,271,210 1,400 1,645,607 23,038,498
804,981 804,578 1,609,157 200 796,533 1,593,065
406,792 406,588 2,032,941 500 402,522 2,012,612
626,153 625,840 75,101 12 619,582 74,350
21,449,319 21,438,595 55,618,848 21,224,209 55,062,659
- -
260,335 260,205 54,920,775 21,107 257,603 54,371,567
196,178 196,080 5,917,694 3,018 194,119 5,858,517
33,780 33,763 5,548,551 16,434 33,425 5,493,065
181,060 180,969 6,465,673 3,573 179,160 6,401,016
671,352 671,017 72,852,692 664,307 72,124,165
- -
332,557 332,391 39,177,910 11,787 329,067 38,786,131

195,585 195,488 23,041,530 11,787 193,533 22,811,114


156,089 156,011 3,706,828 2,376 154,451 3,669,759
76,437 76,399 3,376,818 4,420 75,635 3,343,050
760,669 760,288 69,303,086 752,685 68,610,055
- -
29,254 29,239 13,748,406 470,201 28,947 13,610,922

70,133 70,098 24,011,720 342,545 69,397 23,771,603

19,837 19,827 44,452 2,242 19,629 44,007


59,402 59,372 393,636 6,630 58,778 389,700

29,619 29,604 1,057,707 35,728 29,308 1,047,130


68,454 68,419 4,343,542 63,484 67,735 4,300,106
276,699 276,560 43,599,463 273,795 43,163,468
- -
141,492 141,421 4,699,418 33,230 140,007 4,652,424
179,186 179,097 1,010,105 5,640 177,306 1,000,004
335,297 335,129 1,327,111 3,960 331,778 1,313,840
186,157 186,064 6,581,706 35,373 184,203 6,515,889
222,896 222,784 7,880,630 35,373 220,556 7,801,824
135,306 135,238 1,217,142 9,000 133,886 1,204,971
113,328 113,271 3,964,485 35,000 112,138 3,924,840
394,749 113,271 113,271 1,000 112,138 112,138
278,441 394,552 789,104 2,000 390,606 781,213
308,915 278,302 824,887 2,964 275,519 816,638
168,273 168,189 9,250,369 55,000 166,507 9,157,866
901,464 901,014 901,014 1,000 892,003 892,003
761,638 761,257 8,769,678 11,520 753,644 8,681,981
343,655 343,483 14,625,509 42,580 340,048 14,479,254
143,262 143,191 3,376,432 23,580 141,759 3,342,668
4,614,058 4,416,261 65,330,861 - 4,372,099 64,677,553
- -
2,331,000 2,329,835 2,329,835 1,000 2,306,536 2,306,536
3,063,600 3,062,068 3,062,068 1,000 3,031,448 3,031,448
2,080,792 2,079,751 8,319,005 4,000 2,058,954 8,235,815
1,009,669 1,009,164 1,009,164 1,000 999,073 999,073
232,655 232,539 1,162,693 5,000 230,213 1,151,066
270,506 270,371 270,371 1,000 267,667 267,667
333,541 333,374 1,333,495 4,000 330,040 1,320,160
365,287 365,104 2,190,624 6,000 361,453 2,168,717
217,240 217,132 434,263 2,000 214,960 429,921
52,650 52,624 1,052,474 20,000 52,097 1,041,949
42,967 42,946 2,576,760 60,000 42,517 2,550,992
31,506 31,490 629,809 20,000 31,176 623,511
4,995,000 4,992,503 4,992,503 1,000 4,942,577 4,942,577
83,120 83,079 913,864 11,000 82,248 904,725
153,107 153,030 5,968,168 39,000 151,500 5,908,486
195,986 195,889 7,835,540 40,000 193,930 7,757,185
52,650 52,624 420,989 8,000 52,097 416,780
169,078 168,994 5,407,806 32,000 167,304 5,353,728
2,775,000 2,773,613 5,547,225 2,000 2,745,876 5,491,753
333,000 332,834 665,667 2,000 329,505 659,010

7,215,000 7,211,393 7,211,393 1,000 7,139,279 7,139,279


- - - - -
7,192,800 7,189,204 7,189,204 1,000 7,117,312 7,117,312
555,000 554,723 554,723 1,000 549,175 549,175
7,246,269 7,242,646 7,242,646 1,000 7,170,219 7,170,219
7,118,064 7,114,505 7,114,505 1,000 7,043,360 7,043,360
398,688 398,488 5,977,323 15,000 394,503 5,917,549
255,831 255,703 3,835,539 15,000 253,146 3,797,184
894,840 894,393 7,155,144 8,000 885,449 7,083,592
357,600 357,422 5,718,745 16,000 353,847 5,661,558
337,454 337,285 2,023,711 6,000 333,912 2,003,474
270,299 270,164 1,350,819 5,000 267,462 1,337,310
36,355 36,337 327,034 9,000 35,974 323,764
46,429 46,405 278,432 6,000 45,941 275,648
197,605 197,506 6,912,703 35,000 195,531 6,843,576
53,144 53,117 690,527 13,000 52,586 683,622
269,949 269,814 7,554,789 28,000 267,116 7,479,241
166,500 166,417 1,331,334 8,000 164,753 1,318,021
390,523 390,327 3,122,619 8,000 386,424 3,091,393
140,446 140,375 1,123,002 8,000 138,972 1,111,772
1,165,500 1,164,917 2,329,835 2,000 1,153,268 2,306,536
4,995,000 4,992,503 4,992,503 1,000 4,942,577 4,942,577
1,665,000 1,664,168 1,664,168 1,000 1,647,526 1,647,526
133,200 133,133 2,662,668 20,000 131,802 2,636,041
2,530,800 2,529,535 5,059,069 2,000 2,504,239 5,008,479
62,420,648 62,389,437 149,544,751 61,765,543 148,049,303

117,258,975 117,004,856 1,193,249,652.50 115,834,807.02 1,181,317,155.97

25% Angsuran Rp 89,307,600.00

Uang Muka 357,230,400

Total Harga Termin 1 (30%-35%) 267,922,800.00


Ekatalog
Rp 1,194,935,387

Termin 2 (50%-55%) 148,846,000.00


Termin 3 (70%-75%) 148,846,000.00

Termin 4 (95%-100%) 148,846,000.00


Retensi 5% - 29,769,200.00
Sum 1,041,922,000

Total Harga Excel Rp 1,193,249,652


selisih EKATALOG
Rp 1,685,734
DAN EXCEL

Total Harga 1% Rp 1,181,317,156

Total Harga 0,8% Rp 1,190,767,693


Harga Naik Penyedia 0,8 % Total Harga Naik Penyedia 0,8 % Link E-Katalog

227,462 227,462 https://e-katalog.lkpp.go.id/katalog/produk/detail/77678968?type=regency


3,321,412 3,321,412 https://e-katalog.lkpp.go.id/katalog/produk/detail/77691660?type=regency
2,767,843 2,767,843 https://e-katalog.lkpp.go.id/katalog/produk/detail/77695326?type=regency
327,010 2,403,521 https://e-katalog.lkpp.go.id/katalog/produk/detail/77696569?type=regency
6,643,728 8,720,239
- -
5,535,687 5,535,687 https://e-katalog.lkpp.go.id/katalog/produk/detail/77697011?type=regency
276,784 830,353 https://e-katalog.lkpp.go.id/katalog/produk/detail/77697488?type=regency
11,071 55,357 https://e-katalog.lkpp.go.id/katalog/produk/detail/77698133?type=regency
830,353 830,353 https://e-katalog.lkpp.go.id/katalog/produk/detail/77698347?type=regency
33,214 166,069 https://e-katalog.lkpp.go.id/katalog/produk/detail/77698584?type=regency
67,370 673,696 https://e-katalog.lkpp.go.id/katalog/produk/detail/77698795?type=regency
249,106 2,491,059 https://e-katalog.lkpp.go.id/katalog/produk/detail/77699010?type=regency
55,357 276,784 https://e-katalog.lkpp.go.id/katalog/produk/detail/77699392?type=regency
141,714 708,568 https://e-katalog.lkpp.go.id/katalog/produk/detail/77699694?type=regency
1,107,137 1,107,137 https://e-katalog.lkpp.go.id/katalog/produk/detail/77700027?type=regency
830,353 830,353 https://e-katalog.lkpp.go.id/katalog/produk/detail/77700030?type=regency
221,427 664,282 https://e-katalog.lkpp.go.id/katalog/produk/detail/77700033?type=regency
221,427 664,282 https://e-katalog.lkpp.go.id/katalog/produk/detail/77796480?type=regency
221,427 664,282 https://e-katalog.lkpp.go.id/katalog/produk/detail/77700326?type=regency
9,802,428 15,498,263
- -
- -
79,409 8,667,571 https://e-katalog.lkpp.go.id/katalog/produk/detail/77700328?type=regency
83,179 4,856,899 https://e-katalog.lkpp.go.id/katalog/produk/detail/77700330?type=regency
347,063 4,873,349 https://e-katalog.lkpp.go.id/katalog/produk/detail/77700916?type=regency
60,521 2,682,860 https://e-katalog.lkpp.go.id/katalog/produk/detail/77701114?type=regency
197,852 3,305,172 https://e-katalog.lkpp.go.id/katalog/produk/detail/77701341?type=regency

768,025 24,385,851
- -
985,540 3,159,791 https://e-katalog.lkpp.go.id/katalog/produk/detail/77701643?type=regency
616,698 5,365,271 https://e-katalog.lkpp.go.id/katalog/produk/detail/77701940?type=regency
997,725 62,872,667 https://e-katalog.lkpp.go.id/katalog/produk/detail/77702101?type=regency
15,546 168,014,781 https://e-katalog.lkpp.go.id/katalog/produk/detail/77702433?type=regency
121,515 2,566,396 https://e-katalog.lkpp.go.id/katalog/produk/detail/77702435?type=regency
185,902 8,497,193 https://e-katalog.lkpp.go.id/katalog/produk/detail/77702437?type=regency
176,137 23,868,284 https://e-katalog.lkpp.go.id/katalog/produk/detail/77702692?type=regency
876,972 17,753,428 https://e-katalog.lkpp.go.id/katalog/produk/detail/77702693?type=regency
109,568 4,843,995 https://e-katalog.lkpp.go.id/katalog/produk/detail/77702694?type=regency
85,418 12,881,868 https://e-katalog.lkpp.go.id/katalog/produk/detail/77702972?type=regency
179,644 44,218,319 https://e-katalog.lkpp.go.id/katalog/produk/detail/77702973?type=regency
109,568 4,054,010 https://e-katalog.lkpp.go.id/katalog/produk/detail/77702974?type=regency
109,568 8,698,591 https://e-katalog.lkpp.go.id/katalog/produk/detail/77706572?type=regency
224,851 42,242,079 https://e-katalog.lkpp.go.id/katalog/produk/detail/77706573?type=regency
1,069,883 2,670,258 https://e-katalog.lkpp.go.id/katalog/produk/detail/77706578?type=regency
149,900 3,227,358
https://e-katalog.lkpp.go.id/katalog/produk/detail/77707223?type=regency
166,181 2,155,697
https://e-katalog.lkpp.go.id/katalog/produk/detail/77707231?type=regency
1,003,473 4,475,047 https://e-katalog.lkpp.go.id/katalog/produk/detail/77707237?type=regency
7,184,088 421,565,032
- -
182,581 72,059,926 https://e-katalog.lkpp.go.id/katalog/produk/detail/77708831?type=regency

65,869 66,496,738 https://e-katalog.lkpp.go.id/katalog/produk/detail/77708835?type=regency


29,709 32,662,481 https://e-katalog.lkpp.go.id/katalog/produk/detail/77708840?type=regency
37,622 13,246,954 https://e-katalog.lkpp.go.id/katalog/produk/detail/77709459?type=regency
263,834 7,281,823 https://e-katalog.lkpp.go.id/katalog/produk/detail/77709464?type=regency
291,845 7,669,679 https://e-katalog.lkpp.go.id/katalog/produk/detail/77709466?type=regency
382,726 1,553,486 https://e-katalog.lkpp.go.id/katalog/produk/detail/77710265?type=regency
1,254,186 200,971,087
- -
294,131 16,396,184 https://e-katalog.lkpp.go.id/katalog/produk/detail/77710805?type=regency
229,949 23,976,954 https://e-katalog.lkpp.go.id/katalog/produk/detail/77711374?type=regency
241,202 8,731,635 https://e-katalog.lkpp.go.id/katalog/produk/detail/77711377?type=regency
201,013 1,881,481 https://e-katalog.lkpp.go.id/katalog/produk/detail/77711381?type=regency
178,989 6,493,351 https://e-katalog.lkpp.go.id/katalog/produk/detail/77712408?type=regency
48,076 1,025,949 https://e-katalog.lkpp.go.id/katalog/produk/detail/77712410?type=regency
75,004 1,800,099 https://e-katalog.lkpp.go.id/katalog/produk/detail/77712419?type=regency
75,609 4,020,867 https://e-katalog.lkpp.go.id/katalog/produk/detail/77713095?type=regency
1,343,973 64,326,520
- -
12,612,448 12,612,448 https://e-katalog.lkpp.go.id/katalog/produk/detail/77715017?type=regency
1,574,649 1,574,649 https://e-katalog.lkpp.go.id/katalog/produk/detail/77715024?type=regency
1,314,360 7,886,162 https://e-katalog.lkpp.go.id/katalog/produk/detail/77715029?type=regency
638,261 638,261 https://e-katalog.lkpp.go.id/katalog/produk/detail/77715033?type=regency
1,167,358 4,669,432 https://e-katalog.lkpp.go.id/katalog/produk/detail/77715040?type=regency
594,968 1,189,936 https://e-katalog.lkpp.go.id/katalog/produk/detail/77715607?type=regency
1,658,772 23,222,806 https://e-katalog.lkpp.go.id/katalog/produk/detail/77715612?type=regency
802,905 1,605,810 https://e-katalog.lkpp.go.id/katalog/produk/detail/77715615?type=regency
405,743 2,028,713 https://e-katalog.lkpp.go.id/katalog/produk/detail/77715618?type=regency
624,538 74,945 https://e-katalog.lkpp.go.id/katalog/produk/detail/77715623?type=regency
21,394,002 55,503,161
- -
259,664 54,806,540 https://e-katalog.lkpp.go.id/katalog/produk/detail/77716228?type=regency
195,672 5,905,385 https://e-katalog.lkpp.go.id/katalog/produk/detail/77716231?type=regency
33,692 5,537,010 https://e-katalog.lkpp.go.id/katalog/produk/detail/77716234?type=regency
180,593 6,452,224 https://e-katalog.lkpp.go.id/katalog/produk/detail/77716236?type=regency
669,621 72,701,159
- -
331,699 39,096,420 https://e-katalog.lkpp.go.id/katalog/produk/detail/77716734?type=regency

195,081 22,993,603 https://e-katalog.lkpp.go.id/katalog/produk/detail/77716736?type=regency


155,687 3,699,117 https://e-katalog.lkpp.go.id/katalog/produk/detail/77716740?type=regency
76,240 3,369,794 https://e-katalog.lkpp.go.id/katalog/produk/detail/77716745?type=regency
758,707 69,158,935
- -
29,179 13,719,809 https://e-katalog.lkpp.go.id/katalog/produk/detail/77720763?type=regency

69,952 23,961,776 https://e-katalog.lkpp.go.id/katalog/produk/detail/77720764?type=regency

19,786 44,359 https://e-katalog.lkpp.go.id/katalog/produk/detail/77720766?type=regency


59,248 392,817
https://e-katalog.lkpp.go.id/katalog/produk/detail/77720768?type=regency
29,543 1,055,507 https://e-katalog.lkpp.go.id/katalog/produk/detail/77720769?type=regency
68,277 4,334,507 https://e-katalog.lkpp.go.id/katalog/produk/detail/77720770?type=regency
275,985 43,508,776
- -
141,127 4,689,644 https://e-katalog.lkpp.go.id/katalog/produk/detail/77728148?type=regency
178,724 1,008,004 https://e-katalog.lkpp.go.id/katalog/produk/detail/77728150?type=regency
334,432 1,324,350 https://e-katalog.lkpp.go.id/katalog/produk/detail/77728153?type=regency
185,677 6,568,016 https://e-katalog.lkpp.go.id/katalog/produk/detail/77728157?type=regency
222,321 7,864,238 https://e-katalog.lkpp.go.id/katalog/produk/detail/77728159?type=regency
134,957 1,214,610 https://e-katalog.lkpp.go.id/katalog/produk/detail/77729001?type=regency
113,035 3,956,239 https://e-katalog.lkpp.go.id/katalog/produk/detail/77729007?type=regency
113,035 113,035 https://e-katalog.lkpp.go.id/katalog/produk/detail/77729008?type=regency
393,731 787,463 https://e-katalog.lkpp.go.id/katalog/produk/detail/77729011?type=regency
277,723 823,171 https://e-katalog.lkpp.go.id/katalog/produk/detail/77729016?type=regency
167,839 9,231,129 https://e-katalog.lkpp.go.id/katalog/produk/detail/77731074?type=regency
899,139 899,139 https://e-katalog.lkpp.go.id/katalog/produk/detail/77731115?type=regency
759,673 8,751,437 https://e-katalog.lkpp.go.id/katalog/produk/detail/77732775?type=regency
342,769 14,595,088 https://e-katalog.lkpp.go.id/katalog/produk/detail/77733191?type=regency
142,893 3,369,409 https://e-katalog.lkpp.go.id/katalog/produk/detail/77733684?type=regency
4,407,075 65,194,973
- -
2,324,988 2,324,988 https://e-katalog.lkpp.go.id/katalog/produk/detail/77733696?type=regency
3,055,699 3,055,699 https://e-katalog.lkpp.go.id/katalog/produk/detail/77733765?type=regency
2,075,425 8,301,701 https://e-katalog.lkpp.go.id/katalog/produk/detail/77735065?type=regency
1,007,065 1,007,065 https://e-katalog.lkpp.go.id/katalog/produk/detail/77735093?type=regency
232,055 1,160,274 https://e-katalog.lkpp.go.id/katalog/produk/detail/77735163?type=regency
269,808 269,808 https://e-katalog.lkpp.go.id/katalog/produk/detail/77735375?type=regency
332,680 1,330,722 https://e-katalog.lkpp.go.id/katalog/produk/detail/77736801?type=regency
364,345 2,186,067 https://e-katalog.lkpp.go.id/katalog/produk/detail/77736814?type=regency
216,680 433,360 https://e-katalog.lkpp.go.id/katalog/produk/detail/77736824?type=regency
52,514 1,050,285 https://e-katalog.lkpp.go.id/katalog/produk/detail/77736830?type=regency
42,857 2,571,400 https://e-katalog.lkpp.go.id/katalog/produk/detail/77736853?type=regency
31,425 628,499 https://e-katalog.lkpp.go.id/katalog/produk/detail/77739162?type=regency
4,982,118 4,982,118 https://e-katalog.lkpp.go.id/katalog/produk/detail/77739179?type=regency
82,906 911,963 https://e-katalog.lkpp.go.id/katalog/produk/detail/77739233?type=regency
152,712 5,955,754 https://e-katalog.lkpp.go.id/katalog/produk/detail/77739279?type=regency
195,481 7,819,242 https://e-katalog.lkpp.go.id/katalog/produk/detail/77739287?type=regency
52,514 420,114 https://e-katalog.lkpp.go.id/katalog/produk/detail/77742646?type=regency
168,642 5,396,557 https://e-katalog.lkpp.go.id/katalog/produk/detail/77742668?type=regency
2,767,843 5,535,687 https://e-katalog.lkpp.go.id/katalog/produk/detail/77742759?type=regency
332,141 664,282 https://e-katalog.lkpp.go.id/katalog/produk/detail/77742823?type=regency

7,196,393 7,196,393 https://e-katalog.lkpp.go.id/katalog/produk/detail/77742873?type=regency


- -
7,174,250 7,174,250 https://e-katalog.lkpp.go.id/katalog/produk/detail/77752050?type=regency
553,569 553,569 https://e-katalog.lkpp.go.id/katalog/produk/detail/77752055?type=regency
7,227,581 7,227,581 https://e-katalog.lkpp.go.id/katalog/produk/detail/77752056?type=regency
7,099,706 7,099,706 https://e-katalog.lkpp.go.id/katalog/produk/detail/77752058?type=regency
397,659 5,964,890 https://e-katalog.lkpp.go.id/katalog/produk/detail/77752070?type=regency
255,171 3,827,561 https://e-katalog.lkpp.go.id/katalog/produk/detail/77753819?type=regency
892,533 7,140,261 https://e-katalog.lkpp.go.id/katalog/produk/detail/77753825?type=regency
356,678 5,706,850 https://e-katalog.lkpp.go.id/katalog/produk/detail/77754080?type=regency
336,584 2,019,502 https://e-katalog.lkpp.go.id/katalog/produk/detail/77754094?type=regency
269,602 1,348,009 https://e-katalog.lkpp.go.id/katalog/produk/detail/77754099?type=regency
36,262 326,354 https://e-katalog.lkpp.go.id/katalog/produk/detail/77756191?type=regency
46,309 277,853 https://e-katalog.lkpp.go.id/katalog/produk/detail/77756197?type=regency
197,095 6,898,325 https://e-katalog.lkpp.go.id/katalog/produk/detail/77756200?type=regency
53,007 689,091 https://e-katalog.lkpp.go.id/katalog/produk/detail/77756205?type=regency
269,253 7,539,075 https://e-katalog.lkpp.go.id/katalog/produk/detail/77756210?type=regency
166,071 1,328,565 https://e-katalog.lkpp.go.id/katalog/produk/detail/77756671?type=regency
389,515 3,116,124 https://e-katalog.lkpp.go.id/katalog/produk/detail/77756673?type=regency
140,083 1,120,667 https://e-katalog.lkpp.go.id/katalog/produk/detail/77756675?type=regency
1,162,494 2,324,988 https://e-katalog.lkpp.go.id/katalog/produk/detail/77756678?type=regency
4,982,118 4,982,118 https://e-katalog.lkpp.go.id/katalog/produk/detail/77756680?type=regency
1,660,706 1,660,706 https://e-katalog.lkpp.go.id/katalog/produk/detail/77764734?type=regency
132,856 2,657,130 https://e-katalog.lkpp.go.id/katalog/produk/detail/77766449?type=regency
2,524,273 5,048,546 https://e-katalog.lkpp.go.id/katalog/produk/detail/77769211?type=regency
62,259,667 149,233,698

116,761,485.47 1,190,767,693.22

2,481,959.28

uang muka / Termin : Kontrak :

30% 1,190,768,000 14 Hari Setelah SPMK


(15 April 2024)

30% - 148,846,000

20%
20%

25%
5%
100%
0.34875%
ANALISA HARGA SATUAN STRUKTURAL

1 PEKERJAAN BETON BERTULANG


Pekerjaan Pembesian Besi Beton Polos / Ulir
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga kerja
1 Pekerja L.01 OH 0.0700 86,600 6,062.00
2 Tukang Besi L.02 OH 0.0700 97,000 6,790.00
3 Kepala Tukang L.03 OH 0.0070 101,000 707.00
4 Mandor L.04 OH 0.0040 100,000 400.00
Jumlah Harga Tenaga Kerja 13,959.00
B Bahan
1 Besi Beton (polos/ulir) kg 105.0000 11,500 1,207,500.00
2 Kawat Bendrad kg 0.1500 17,250 2,587.50
Jumlah Harga Bahan 1,210,087.50
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 1,224,046.50
E Overhead + Profit 10.00% 122,404.65
F Harga Satuan Pekerjaan ( D + E ) 1,346,451.00
13,464.51

1m2 Pekerjaan Bekisting Pondasi Menggunakan Batako


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga kerja
1 Pekerja L.01 OH 0.6710 86,600 58,108.60
2 Tukang Batu L.02 OH 0.1300 96,000 12,480.00
3 Kepala Tukang Batu L.03 OH 0.0130 101,000 1,313.00
4 Mandor L.04 OH 0.0030 100,000 300.00
Jumlah Harga Tenaga Kerja 72,201.60
B Bahan
1 PC / Portland Cement kg 2 1,275 2,575.50
2 PB / Pasir Pasang m3 0.0079 154 1.21
3 Batako bh 12.5000 2,000 25,000.00

Jumlah Harga Bahan 27,576.71


C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 99,778.31
E Overhead + Profit 10.00% 9,977.83
F Harga Satuan Pekerjaan ( D + E ) 109,756.00

A.4.1.1.19 Pemasangan 1 m2 Bekisting untuk Sloof Beton Bangunan Gedung


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga kerja
1 Pekerja L.01 OH 0.5200 86,600 45,032.00
2 Tukang Kayu L.02 OH 0.2600 98,000 25,480.00
3 Kepala Tukang Kayu L.03 OH 0.0260 106,000 2,756.00
4 Mandor L.04 OH 0.0260 100,000 2,600.00
Jumlah Harga Tenaga Kerja 75,868.00
B Bahan
1 Kayu glugu balok m3 0.0450 1,570,000 70,650.00
2 Paku 1" s/d 4" kg 0.3000 16,100 4,830.00
3 Minyak bekisting ltr 0.1000 13,000 1,300.00

Jumlah Harga Bahan 76,780.00


C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 152,648.00
E Overhead + Profit 10.00% 15,264.80
F Harga Satuan Pekerjaan ( D + E ) 167,912.00
A.4.1.1.20. Pemasangan 1 m2 Bekisting untuk Kolom Beton Bangunan Gedung
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga kerja
1 Pekerja L.01 OH 0.6600 86,600 57,156.00
2 Tukang Kayu L.02 OH 0.3300 98,000 32,340.00
3 Kepala Tukang Kayu L.03 OH 0.0330 106,000 3,498.00
4 Mandor L.04 OH 0.0330 100,000 3,300.00
Jumlah Harga Tenaga Kerja 96,294.00
B Bahan
1 Kayu glugu balok m3 0.0400 1,570,000 62,800.00
2 Paku 1" s/d 4" kg 0.4000 16,100 6,440.00
3 Minyak bekisting ltr 0.2000 13,000 2,600.00
4 Balok Kayu Kelas II (Bekisting) m3 0.0150 1,920,000 28,800.00
5 Plywood / Multiplek tbl 9 mm lbr 0.3500 149,500 52,325.00
6 Kayu Dolken btg 2.0000 20,000 40,000.00

Jumlah Harga Bahan 192,965.00


C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 289,259.00
E Overhead + Profit 10.00% 28,925.90
F Harga Satuan Pekerjaan ( D + E ) 318,184.00
159,092.00

A.4.1.1.21. Pemasangan 1 m2 Bekisting untuk Balok Bangunan Gedung


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga kerja
1 Pekerja L.01 OH 0.6600 86,600 57,156.00
2 Tukang Kayu L.02 OH 0.3300 98,000 32,340.00
3 Kepala Tukang Kayu L.03 OH 0.0330 106,000 3,498.00
4 Mandor L.04 OH 0.0330 100,000 3,300.00
Jumlah Harga Tenaga Kerja 96,294.00
B Bahan
1 Kayu glugu balok m3 0.0400 1,570,000 62,800.00
2 Paku 1" s/d 4" kg 0.4000 16,100 6,440.00
3 Minyak bekisting ltr 0.2000 13,000 2,600.00
4 Balok Kayu Kelas II (Bekisting) m3 0.0180 1,920,000 34,560.00
5 Plywood / Multiplek tbl 9 mm lbr 0.3500 149,500 52,325.00
6 Kayu Dolken btg 2.0000 20,000 40,000.00

Jumlah Harga Bahan 198,725.00


C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 295,019.00
E Overhead + Profit 10.00% 29,501.90
F Harga Satuan Pekerjaan ( D + E ) 324,520.00
162,260.00

A.4.1.1.22. Pemasangan 1 m2 Bekisting untuk Plat lantai Beton Bangunan Gedung


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga kerja
1 Pekerja L.01 OH 0.6600 86,600 57,156.00
2 Tukang Kayu L.02 OH 0.3300 98,000 32,340.00
3 Kepala Tukang Kayu L.03 OH 0.0330 106,000 3,498.00
4 Mandor L.04 OH 0.0330 100,000 3,300.00
Jumlah Harga Tenaga Kerja 96,294.00
B Bahan
1 Kayu glugu balok m3 0.0400 1,570,000 62,800.00
2 Paku 1" s/d 4" kg 0.4000 16,100 6,440.00
3 Minyak bekisting ltr 0.2000 13,000 2,600.00
4 Balok Kayu Kelas II (Bekisting) m3 0.0150 1,920,000 28,800.00
5 Plywood / Multiplek tbl 9 mm lbr 0.3500 149,500 52,325.00
6 Kayu Dolken btg 6.0000 20,000 120,000.00

Jumlah Harga Bahan 272,965.00


C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 369,259.00
E Overhead + Profit 10.00% 36,925.90
F Harga Satuan Pekerjaan ( D + E ) 406,184.00
203,092.00
135,394.67
Pekerjaan Bekisting Tangga
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga kerja
1 Pekerja L.01 OH 0.6600 86,600 57,156.00
2 Tukang Kayu L.02 OH 0.3300 98,000 32,340.00
3 Kepala Tukang Kayu L.03 OH 0.0330 106,000 3,498.00
4 Mandor L.04 OH 0.0330 100,000 3,300.00
Jumlah Harga Tenaga Kerja 96,294.00
B Bahan
1 Kayu glugu balok m3 0.0300 1,570,000 47,100.00
2 Paku 1" s/d 4" kg 0.4000 16,100 6,440.00
3 Minyak bekisting ltr 0.1500 13,000 1,950.00
4 Balok Kayu Kelas II (Bekisting) m3 0.0150 1,920,000 28,800.00
5 Plywood / Multiplek tbl 9 mm lbr 0.3500 149,500 52,325.00
6 Kayu Dolken btg 2.0000 20,000 40,000.00

Jumlah Harga Bahan 176,615.00


C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 272,909.00
E Overhead + Profit 10.00% 27,290.90
F Harga Satuan Pekerjaan ( D + E ) 300,199.00
150,099.50

2.2.1.1.b.(c) Pekerjaan Lantai Kerja K-100 / F'c 7,4 Mpa


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga kerja
1 Pekerja L.01 OH 1.6500 86,600 142,890.00
2 Tukang Batu L.02 OH 0.2750 96,000 26,400.00
3 Kepala Tukang Batu L.03 OH 0.2800 101,000 28,280.00
4 Mandor L.04 OH 0.0830 100,000 8,300.00
Jumlah Harga Tenaga Kerja 205,870.00
B Bahan
1 PC / Portland Cement kg 247 1,275 314,925.00
2 PB / Pasir Beton kg 869.0000 196 170,696.43
3 Kr / Kerikil kg 999.0000 117 117,012.50
4 Air liter 215 3 741.75
Jumlah Harga Bahan 603,375.68
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 809,245.68
E Overhead + Profit 10.00% 80,924.57
F Harga Satuan Pekerjaan ( D + E ) 890,170.00

2.2.2.1.f.(c) PEKERJAAN 1m3 BETON 1 PC : 3 PS : 5 KR, K-175 (14,5Mpa)


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga kerja
1 Pekerja L.01 OH 1.6500 86,600 142,890.00
2 Tukang Batu L.02 OH 0.2750 96,000 26,400.00
3 Kepala Tukang Batu L.03 OH 0.0280 101,000 2,828.00
4 Mandor L.04 OH 0.0830 100,000 8,300.00
Jumlah Harga Tenaga Kerja 180,418.00
B Bahan
1 PC / Portland Cement kg 326 1,275 415,650.00
2 PB / Pasir Beton m3 0.4800 275,000 132,000.00
3 Kr / Kerikil m3 0.7100 210,833 149,691.66
4 Air ltr 215 3 741.75
Jumlah Harga Bahan 698,083.41
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 878,501.41
E Overhead + Profit 10.00% 87,850.14
F Harga Satuan Pekerjaan ( D + E ) 966,351.00
PEMBUATAN s.d PENGECORAN 1 m3 BETON MUTU SEDANG fc' 25 Mpa, SLUMP (100 ± 25) mm, AGREGAT MAKSIMAL
19 mm SECARA SEMI-MEKANIS
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga kerja
1 Pekerja L.01 OH 1.0000 86,600 86,600.00
2 Tukang Batu L.02 OH 0.2500 96,000 24,000.00
3 Kepala Tukang Batu L.03 OH 0.0250 101,000 2,525.00
4 Mandor L.04 OH 0.1000 100,000 10,000.00
Jumlah Harga Tenaga Kerja 123,125.00
B Bahan
1 PC / Portland Cement kg 407 1,275 518,925.00
2 PB / Pasir Beton kg 731.0000 196 143,589.29
3 Kr / Kerikil kg 1009.0000 117 118,183.79
4 Air ltr 202 3 696.90
Jumlah Harga Bahan 781,394.98
C Peralatan
1 Molen/Beton mixer 0,35 m3 termasuk hari 0.1475 250,000 36,875.00
feeder
Jumlah Harga Peralatan 36,875.00
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 941,394.98
E Overhead + Profit 10.00% 94,139.50
F Harga Satuan Pekerjaan ( D + E ) 1,035,534.00

Pekerjaan Beton Ready Mix K-300 f'c 25 MPa


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga kerja
1 Pekerja L.01 OH 0.8000 86,600 69,280.00
2 Tukang Batu L.02 OH 0.0800 96,000 7,680.00
3 Kepala Tukang Batu L.03 OH 0.0100 101,000 1,010.00
4 Mandor L.04 OH 0.0100 100,000 1,000.00
Jumlah Harga Tenaga Kerja 78,970.00
B Bahan
1 Beton Ready Mix K-300 / f'c 25 Mpa m3 1.0000 780,000 780,000.00
Jumlah Harga Bahan 780,000.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 858,970.00
E Overhead + Profit 10.00% 85,897.00
F Harga Satuan Pekerjaan ( D + E ) 944,867.00

Pekerjaan Beton Ready Mix K-275


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga kerja
1 Pekerja L.01 OH 0.4000 86,600 34,640.00
2 Tukang Batu L.02 OH 0.1000 96,000 9,600.00
3 Kepala Tukang Batu L.03 OH 0.0100 101,000 1,010.00
4 Mandor L.04 OH 0.0400 100,000 4,000.00
Jumlah Harga Tenaga Kerja 49,250.00
B Bahan
1 Beton Ready Mix K-275 m3 1.0000 770,000 770,000.00
Jumlah Harga Bahan 770,000.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 819,250.00
E Overhead + Profit 10.00% 81,925.00
F Harga Satuan Pekerjaan ( D + E ) 901,175.00

Pekerjaan Beton Ready Mix K-250 f'c 20,75 MPa


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga kerja
1 Pekerja L.01 OH 0.8000 86,600 69,280.00
2 Tukang Batu L.02 OH 0.0800 96,000 7,680.00
3 Kepala Tukang Batu L.03 OH 0.0100 101,000 1,010.00
4 Mandor L.04 OH 0.0100 100,000 1,000.00
Jumlah Harga Tenaga Kerja 78,970.00
B Bahan
1 Beton Ready Mix K-250 / f'c 20,75 Mpa m3 1.0000 765,000 765,000.00
Jumlah Harga Bahan 765,000.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 843,970.00
E Overhead + Profit 10.00% 84,397.00
F Harga Satuan Pekerjaan ( D + E ) 928,367.00

Pekerjaan Beton Ready Mix K-200 f'c 16,60 MPa


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga kerja
1 Pekerja L.01 OH 0.8000 86,600 69,280.00
2 Tukang Batu L.02 OH 0.0800 96,000 7,680.00
3 Kepala Tukang Batu L.03 OH 0.0100 101,000 1,010.00
4 Mandor L.04 OH 0.0100 100,000 1,000.00
Jumlah Harga Tenaga Kerja 78,970.00
B Bahan
1 Beton Ready Mix K-200 / f'c 16,60 Mpa m3 1.0000 745,000 745,000.00
Jumlah Harga Bahan 745,000.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 823,970.00
E Overhead + Profit 10.00% 82,397.00
F Harga Satuan Pekerjaan ( D + E ) 906,367.00
Pekerjaan 1m' Kolom Praktis
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga kerja
1 Pekerja OH 0.1800 86,600 15,588.00
2 Tukang Batu OH 0.0200 96,000 1,920.00
3 Tukang besi OH 0.0200 97,000 1,940.00
4 Tukang kayu OH 0.0200 98,000 1,960.00
5 Kepala Tukang OH 0.0060 101,000 606.00
6 Mandor OH 0.0090 100,000 900.00
Jumlah Harga Tenaga Kerja 22,914.00
B Bahan
1 Kayu glugu balok m3 0.0020 1,570,000 3,140.00
2 Paku 1" s/d 4" kg 0.0100 16,100 161.00
3 Besi Beton kg 3.0000 11,500 34,500.00
4 Kawat Ikat Beton kg 0.0450 17,250 776.25
5 Semen Portland (PC) kg 4.0000 1,275 5,100.00
6 Pasir Cor / Pasir Beton m3 0.0060 275,000 1,650.00
7 Kerikil Beton m3 0.0090 210,833 1,897.50

Jumlah Harga Bahan 47,224.75


C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 70,138.75
E Overhead + Profit 10.00% 7,013.87
F Harga Satuan Pekerjaan ( D + E ) 77,152.000

Pekerjaan 1m' Balok Praktis


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga kerja
1 Pekerja OH 0.2970 86,600 25,720.20
2 Tukang Batu OH 0.0330 96,000 3,168.00
3 Tukang besi OH 0.0330 97,000 3,201.00
4 Tukang kayu OH 0.0330 98,000 3,234.00
5 Kepala Tukang OH 0.0010 101,000 101.00
6 Mandor OH 0.0150 100,000 1,500.00
Jumlah Harga Tenaga Kerja 36,924.20
B Bahan
1 Papan Kayu Kelas III (Bekisting) m3 0.0030 1,570,000 4,710.00
2 Paku 1" s/d 4" kg 0.0200 16,100 322.00
3 Besi Beton kg 3.0000 11,500 34,500.00
4 Kawat Ikat Beton kg 0.0500 17,250 862.50
5 Semen Portland (PC) kg 5.5000 1,275 7,012.50
6 Pasir Cor / Pasir Beton m3 0.0090 275,000 2,475.00
7 Kerikil Beton m3 0.0150 210,833 3,162.50

Jumlah Harga Bahan 53,044.50


C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 89,968.70
E Overhead + Profit 10.00% 8,996.87
F Harga Satuan Pekerjaan ( D + E ) 98,965.00

Pekerjaan 1m' Sloof Praktis


Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga kerja
1 Pekerja OH 0.2970 86,600 25,720.20
2 Tukang Batu OH 0.0330 96,000 3,168.00
3 Tukang besi OH 0.0330 97,000 3,201.00
4 Tukang kayu OH 0.0330 98,000 3,234.00
5 Kepala Tukang OH 0.0010 101,000 101.00
6 Mandor OH 0.0150 100,000 1,500.00
Jumlah Harga Tenaga Kerja 36,924.20
B Bahan
1 Papan Kayu Kelas III (Bekisting) m3 0.0030 1,570,000 4,710.00
2 Paku 1" s/d 4" kg 0.0200 16,100 322.00
3 Besi Beton kg 3.0000 11,500 34,500.00
4 Kawat Ikat Beton kg 0.0500 17,250 862.50
5 Semen Portland (PC) kg 5.5000 1,275 7,012.50
6 Pasir Cor / Pasir Beton m3 0.0090 275,000 2,475.00
7 Kerikil Beton m3 0.0150 210,833 3,162.50

Jumlah Harga Bahan 53,044.50


C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C ) 89,968.70
E Overhead + Profit 10.00% 8,996.87
F Harga Satuan Pekerjaan ( D + E ) 98,965.00
A.5.1.1.26. Pemasangan Pipa PVC AW dia. 3/4 inch Rp 28,383.96
No Uraian Satuan Koefisien HargaSatuan(Rp) JumlahHarga(Rp)
A TENAGA
Pekerja OH 0.036 Rp 86,600.00 Rp 3,117.60
Tukang Pipa OH 0.06 Rp 96,000.00 Rp 5,760.00
Kepala Tukang OH 0.006 Rp 101,000.00 Rp 606.00
Mandor OH 0.002 Rp 100,000.00 Rp 200.00
JUMLAH TENAGA KERJA Rp 9,683.60
B BAHAN
Pipa PVC AW dia. 3/4 inch m' 1.200 Rp 10,400.00 Rp 12,480.00
Aksesoris/ perlengkapan 10% lot 1.000 Rp 3,640.00 Rp 3,640.00
JUMLAH HARGA BAHAN Rp 16,120.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 25,803.60


E Overhead & Profit 10% Rp 2,580.36
F Harga Satuan Pekerjaan (D+E) Rp 28,383.96

Pemasangan Pipa PVC AW dia. 1 inch Rp 38,709.44


No Uraian Satuan Koefisien HargaSatuan(Rp) JumlahHarga(Rp)
A TENAGA
Pekerja OH 0.054 Rp 86,600.00 Rp 4,676.40
Tukang Pipa OH 0.09 Rp 96,000.00 Rp 8,640.00
Kepala Tukang OH 0.009 Rp 101,000.00 Rp 909.00
Mandor OH 0.027 Rp 100,000.00 Rp 2,700.00
JUMLAH TENAGA KERJA Rp 16,925.40
B BAHAN
Pipa PVC AW dia. 1 inch m' 1.200 Rp 14,050.00 Rp 16,860.00
Aksesoris/ perlengkapan 10% lot 1.000 Rp 1,405.00 Rp 1,405.00
JUMLAH HARGA BAHAN Rp 18,265.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 35,190.40


E Overhead & Profit 10% Rp 3,519.04
F Harga Satuan Pekerjaan (D+E) Rp 38,709.44

A.5.1.1.27. Pemasangan Pipa PVC AW dia. 1 inch Rp 39,466.46


No Uraian Satuan Koefisien HargaSatuan(Rp) JumlahHarga(Rp)
A TENAGA
Pekerja OH 0.036 Rp 86,600.00 Rp 3,117.60
Tukang Pipa OH 0.06 Rp 96,000.00 Rp 5,760.00
Kepala Tukang OH 0.006 Rp 101,000.00 Rp 606.00
Mandor OH 0.002 Rp 100,000.00 Rp 200.00
JUMLAH TENAGA KERJA Rp 9,683.60
B BAHAN
Pipa PVC AW dia. 1 1/2 inch m' 1.200 Rp 16,900.00 Rp 20,280.00
Aksesoris/ perlengkapan 10% lot 1.000 Rp 5,915.00 Rp 5,915.00
JUMLAH HARGA BAHAN Rp 26,195.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 35,878.60


E Overhead & Profit 10% Rp 3,587.86
F Harga Satuan Pekerjaan (D+E) Rp 39,466.46
A.5.1.1.29. Pemasangan Pipa PVC AW dia. 2 inch Rp 74,882.94
No Uraian Satuan Koefisien HargaSatuan(Rp) JumlahHarga(Rp)
A TENAGA
Pekerja OH 0.054 Rp 86,600.00 Rp 4,676.40
Tukang Pipa OH 0.09 Rp 96,000.00 Rp 8,640.00
Kepala Tukang OH 0.009 Rp 101,000.00 Rp 909.00
Mandor OH 0.027 Rp 100,000.00 Rp 2,700.00
JUMLAH TENAGA KERJA Rp 16,925.40
B BAHAN
Pipa PVC AW dia. 2 inch m' 1.200 Rp 33,000.00 Rp 39,600.00
Aksesoris/ perlengkapan 10% lot 1.000 Rp 11,550.00 Rp 11,550.00
JUMLAH HARGA BAHAN Rp 51,150.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 68,075.40


E Overhead & Profit 10% Rp 6,807.54
F Harga Satuan Pekerjaan (D+E) Rp 74,882.94

Pemasangan Pipa PVC AW dia. 3 inch Rp 137,933.79


No Uraian Satuan Koefisien HargaSatuan(Rp) JumlahHarga(Rp)
A TENAGA
Pekerja OH 0.081 Rp 86,600.00 Rp 7,014.60
Tukang Pipa OH 0.135 Rp 96,000.00 Rp 12,960.00
Kepala Tukang OH 0.0135 Rp 101,000.00 Rp 1,363.50
Mandor OH 0.004 Rp 100,000.00 Rp 400.00
JUMLAH TENAGA KERJA Rp 21,738.10
B BAHAN
Pipa PVC AW dia. 3 inch m' 1.200 Rp 66,875.00 Rp 80,250.00
Aksesoris/ perlengkapan 10% lot 1.000 Rp 23,406.25 Rp 23,406.25
JUMLAH HARGA BAHAN Rp 103,656.25
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 125,394.35


E Overhead & Profit 10% Rp 12,539.44
F Harga Satuan Pekerjaan (D+E) Rp 137,933.79

Pemasangan Pipa PVC AW dia. 4 inch Rp 176,564.41


No Uraian Satuan Koefisien HargaSatuan(Rp) JumlahHarga(Rp)
A TENAGA
Pekerja OH 0.081 Rp 86,600.00 Rp 7,014.60
Tukang Pipa OH 0.135 Rp 96,000.00 Rp 12,960.00
Kepala Tukang OH 0.0135 Rp 101,000.00 Rp 1,363.50
Mandor OH 0.004 Rp 100,000.00 Rp 400.00
JUMLAH TENAGA KERJA Rp 21,738.10
B BAHAN
Pipa PVC AW dia. 4 inch m' 1.200 Rp 106,750.00 Rp 128,100.00
Aksesoris/ perlengkapan 10% lot 1.000 Rp 10,675.00 Rp 10,675.00
JUMLAH HARGA BAHAN Rp 138,775.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 160,513.10


E Overhead & Profit 10% Rp 16,051.31
F Harga Satuan Pekerjaan (D+E) Rp 176,564.41
Pemasangan Stop Kran 1" Rp 195,712.00
No Uraian Satuan Koefisien HargaSatuan(Rp) JumlahHarga(Rp)
A TENAGA
Pekerja OH 0.100 Rp 86,600.00 Rp 8,660.00
Tukang Pipa OH 0.150 Rp 96,000.00 Rp 14,400.00
Kepala Tukang OH 0.010 Rp 101,000.00 Rp 1,010.00
Mandor OH 0.001 Rp 100,000.00 Rp 100.00
JUMLAH TENAGA KERJA Rp 24,170.00
B BAHAN
Stop Kran 1" m' 1.000 Rp 150,000.00 Rp 150,000.00
seal tape lot 0.250 Rp 15,000.00 Rp 3,750.00
JUMLAH HARGA BAHAN Rp 153,750.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 177,920.00


E Overhead & Profit 10% Rp 17,792.00
F Harga Satuan Pekerjaan (D+E) Rp 195,712.00

Pemasangan MDP Rp 7,303,670.00


No Uraian Satuan Koefisien HargaSatuan(Rp) JumlahHarga(Rp)
A TENAGA
Pekerja OH 2.000 Rp 86,600.00 Rp 173,200.00
Tukang Listrik OH 1.000 Rp 96,000.00 Rp 96,000.00
Kepala Tukang OH 0.500 Rp 101,000.00 Rp 50,500.00
Mandor OH 0.250 Rp 100,000.00 Rp 25,000.00
JUMLAH TENAGA KERJA Rp 344,700.00
B BAHAN
Panel Box Wall Mounted 70x50x25 unit 1.00Rp 1,250,000.00 Rp 1,250,000.00
Pilot lamp & fuse bh 3.00Rp 40,000.00 Rp 120,000.00
Frekuensi meter bh 1.00Rp 750,000.00 Rp 750,000.00
CT 1000/5A bh 3.00Rp 150,000.00 Rp 450,000.00
Ampere meter bh 3.00Rp 125,000.00 Rp 375,000.00
Voltmeter (0-500V) bh 1.00Rp 125,000.00 Rp 125,000.00
Selector switch bh 1.00Rp 125,000.00 Rp 125,000.00
MCCB 50 A, 18 KA bh 1.00Rp 675,000.00 Rp 675,000.00
MCCB 20 A, 18 KA bh 5.00Rp 270,000.00 Rp 1,350,000.00
Busbar RSTN-GND lot 1.00Rp 250,000.00 Rp 250,000.00
Kabel, Wiring & Pemasangan lot 1.00Rp 450,000.00 Rp 450,000.00
Material Bantu lot 1.00Rp 375,000.00 Rp 375,000.00
JUMLAH HARGA BAHAN Rp 6,295,000.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 6,639,700.00


E Overhead & Profit 10% Rp 663,970.00
F Harga Satuan Pekerjaan (D+E) Rp 7,303,670.00

Pemasangan SDP PP Lantai Dasar Rp 6,528,170.00


No Uraian Satuan Koefisien HargaSatuan(Rp) JumlahHarga(Rp)
A TENAGA
Pekerja OH 2.000 Rp 86,600.00 Rp 173,200.00
Tukang Listrik OH 1.000 Rp 96,000.00 Rp 96,000.00
Kepala Tukang OH 0.500 Rp 101,000.00 Rp 50,500.00
Mandor OH 0.250 Rp 100,000.00 Rp 25,000.00
JUMLAH TENAGA KERJA Rp 344,700.00
B BAHAN
Panel Box Wall Mounted 70x50x25 unit 1.00 Rp 1,250,000.00 Rp 1,250,000.00
Pilot lamp & fuse bh 3.00 Rp 40,000.00 Rp 120,000.00
Frekuensi meter bh 1.00 Rp 750,000.00 Rp 750,000.00
CT 1000/5A bh 3.00 Rp 150,000.00 Rp 450,000.00
Ampere meter bh 3.00 Rp 125,000.00 Rp 375,000.00
Voltmeter (0-500V) bh 1.00 Rp 125,000.00 Rp 125,000.00
Selector switch bh 1.00 Rp 125,000.00 Rp 125,000.00
MCCB 20 A, 7.5 KA bh 1.00 Rp 270,000.00 Rp 270,000.00
MCB 10 A, 1P 6 KA bh 10.00 Rp 105,000.00 Rp 1,050,000.00
Busbar RSTN-GND lot 1.00 Rp 250,000.00 Rp 250,000.00
Kabel, Wiring & Pemasangan lot 1.00 Rp 450,000.00 Rp 450,000.00
Material Bantu lot 1.00 Rp 375,000.00 Rp 375,000.00
JUMLAH HARGA BAHAN Rp 5,590,000.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 5,934,700.00


E Overhead & Profit 10% Rp 593,470.00
F Harga Satuan Pekerjaan (D+E) Rp 6,528,170.00
Pemasangan SDP PP Lantai 2 Rp 6,412,670.00
No Uraian Satuan Koefisien HargaSatuan(Rp) JumlahHarga(Rp)
A TENAGA
Pekerja OH 2.000 Rp 86,600.00 Rp 173,200.00
Tukang Listrik OH 1.000 Rp 96,000.00 Rp 96,000.00
Kepala Tukang OH 0.500 Rp 101,000.00 Rp 50,500.00
Mandor OH 0.250 Rp 100,000.00 Rp 25,000.00
JUMLAH TENAGA KERJA Rp 344,700.00
B BAHAN
Panel Box Wall Mounted 70x50x25 unit 1.00Rp 1,250,000.00 Rp 1,250,000.00
Pilot lamp & fuse bh 3.00Rp 40,000.00 Rp 120,000.00
Frekuensi meter bh 1.00Rp 750,000.00 Rp 750,000.00
CT 1000/5A bh 3.00Rp 150,000.00 Rp 450,000.00
Ampere meter bh 3.00Rp 125,000.00 Rp 375,000.00
Voltmeter (0-500V) bh 1.00Rp 125,000.00 Rp 125,000.00
Selector switch bh 1.00Rp 125,000.00 Rp 125,000.00
MCCB 20 A, 18 KA bh 1.00Rp 270,000.00 Rp 270,000.00
MCB 10 A, 1P 6 KA bh 9.00Rp 105,000.00 Rp 945,000.00
Busbar RSTN-GND lot 1.00Rp 250,000.00 Rp 250,000.00
Kabel, Wiring & Pemasangan lot 1.00Rp 450,000.00 Rp 450,000.00
Material Bantu lot 1.00Rp 375,000.00 Rp 375,000.00
JUMLAH HARGA BAHAN Rp 5,485,000.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 5,829,700.00


E Overhead & Profit 10% Rp 582,970.00
F Harga Satuan Pekerjaan (D+E) Rp 6,412,670.00

Pemasangan Kabel NYY 4c X 25 mm Rp 359,177.94


No Uraian Satuan Koefisien HargaSatuan(Rp) JumlahHarga(Rp)
A TENAGA
Pekerja OH 0.054 Rp 86,600.00 Rp 4,676.40
Tukang Listrik OH 0.09 Rp 96,000.00 Rp 8,640.00
Kepala Tukang OH 0.009 Rp 101,000.00 Rp 909.00
Mandor OH 0.027 Rp 100,000.00 Rp 2,700.00
JUMLAH TENAGA KERJA Rp 16,925.40
B BAHAN
Kabel NYY 4c X 25 mm m' 1.000 Rp 265,000.00 Rp 265,000.00
BC. 25 mm lot 1.000 Rp 44,600.00 Rp 44,600.00
JUMLAH HARGA BAHAN Rp 309,600.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 326,525.40


E Overhead & Profit 10% Rp 32,652.54
F Harga Satuan Pekerjaan (D+E) Rp 359,177.94
Pemasangan Kabel NYY 4c X 16 mm Rp 230,477.94
No Uraian Satuan Koefisien HargaSatuan(Rp) JumlahHarga(Rp)
A TENAGA
Pekerja OH 0.054 Rp 86,600.00 Rp 4,676.40
Tukang Listrik OH 0.09 Rp 96,000.00 Rp 8,640.00
Kepala Tukang OH 0.009 Rp 101,000.00 Rp 909.00
Mandor OH 0.027 Rp 100,000.00 Rp 2,700.00
JUMLAH TENAGA KERJA Rp 16,925.40
B BAHAN
Kabel NYY 4c X 16 mm m' 1.000 Rp 148,000.00 Rp 148,000.00
BC. 25 mm lot 1.000 Rp 44,600.00 Rp 44,600.00
JUMLAH HARGA BAHAN Rp 192,600.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 209,525.40


E Overhead & Profit 10% Rp 20,952.54
F Harga Satuan Pekerjaan (D+E) Rp 230,477.94

Pemasangan Lampu RM SLIM LED PANEL 45Watt Rp 806,162.50


No Uraian Satuan Koefisien HargaSatuan(Rp) JumlahHarga(Rp)
A TENAGA
Pekerja OH 0.25 Rp 86,600.00 Rp 21,650.00
Tukang Listrik OH 0.25 Rp 96,000.00 Rp 24,000.00
Kepala Tukang OH 0.025 Rp 101,000.00 Rp 2,525.00
Mandor OH 0.027 Rp 100,000.00 Rp 2,700.00
JUMLAH TENAGA KERJA Rp 50,875.00
B BAHAN
RM SLIM LED PANEL 45 Watt bh 1.000 Rp 620,000.00 Rp 620,000.00
Aksesories 10 % lot 1.000 Rp 62,000.00 Rp 62,000.00
JUMLAH HARGA BAHAN Rp 682,000.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 732,875.00


E Overhead & Profit 10% Rp 73,287.50
F Harga Satuan Pekerjaan (D+E) Rp 806,162.50

Pemasangan DL RECESSED, SMART BRIGHT 24W, 600lm, D150 Rp 322,162.50


No Uraian Satuan Koefisien HargaSatuan(Rp) JumlahHarga(Rp)
A TENAGA
Pekerja OH 0.25 Rp 86,600.00 Rp 21,650.00
Tukang Listrik OH 0.25 Rp 96,000.00 Rp 24,000.00
Kepala Tukang OH 0.025 Rp 101,000.00 Rp 2,525.00
Mandor OH 0.027 Rp 100,000.00 Rp 2,700.00
JUMLAH TENAGA KERJA Rp 50,875.00
B BAHAN
DL RECESSED, SMART BRIGHT 24W, 600lm, D150 bh 1.000 Rp 220,000.00 Rp 220,000.00
Aksesories 10 % lot 1.000 Rp 22,000.00 Rp 22,000.00
JUMLAH HARGA BAHAN Rp 242,000.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 292,875.00


E Overhead & Profit 10% Rp 29,287.50
F Harga Satuan Pekerjaan (D+E) Rp 322,162.50
Pemasangan DL SURFACE, SMART BRIGHT 12W, 900lm, D150 Rp 304,012.50
No Uraian Satuan Koefisien HargaSatuan(Rp) JumlahHarga(Rp)
A TENAGA
Pekerja OH 0.25 Rp 86,600.00 Rp 21,650.00
Tukang Listrik OH 0.25 Rp 96,000.00 Rp 24,000.00
Kepala Tukang OH 0.025 Rp 101,000.00 Rp 2,525.00
Mandor OH 0.027 Rp 100,000.00 Rp 2,700.00
JUMLAH TENAGA KERJA Rp 50,875.00
B BAHAN
DL SURFACE, SMART BRIGHT 12W, 900lm, D150 bh 1.000 Rp 205,000.00 Rp 205,000.00
Aksesories 10 % lot 1.000 Rp 20,500.00 Rp 20,500.00
JUMLAH HARGA BAHAN Rp 225,500.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 276,375.00


E Overhead & Profit 10% Rp 27,637.50
F Harga Satuan Pekerjaan (D+E) Rp 304,012.50

Pemasangan DL RECESSED, SMART BRIGHT 9W, 600lm, D100 Rp 243,512.50


No Uraian Satuan Koefisien HargaSatuan(Rp) JumlahHarga(Rp)
A TENAGA
Pekerja OH 0.25 Rp 86,600.00 Rp 21,650.00
Tukang Listrik OH 0.25 Rp 96,000.00 Rp 24,000.00
Kepala Tukang OH 0.025 Rp 101,000.00 Rp 2,525.00
Mandor OH 0.027 Rp 100,000.00 Rp 2,700.00
JUMLAH TENAGA KERJA Rp 50,875.00
B BAHAN
DL RECESSED, SMART BRIGHT 9W, 600lm, D100 bh 1.000 Rp 155,000.00 Rp 155,000.00
Aksesories 10 % lot 1.000 Rp 15,500.00 Rp 15,500.00
JUMLAH HARGA BAHAN Rp 170,500.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 221,375.00


E Overhead & Profit 10% Rp 22,137.50
F Harga Satuan Pekerjaan (D+E) Rp 243,512.50

Pemasangan Saklar Tunggal, Rp 32,752.50


No Uraian Satuan Koefisien HargaSatuan(Rp) JumlahHarga(Rp)
A TENAGA
Pekerja OH 0.05 Rp 86,600.00 Rp 4,330.00
Tukang Listrik OH 0.025 Rp 96,000.00 Rp 2,400.00
Kepala Tukang OH 0.025 Rp 101,000.00 Rp 2,525.00
Mandor OH 0.0127 Rp 100,000.00 Rp 1,270.00
JUMLAH TENAGA KERJA Rp 10,525.00
B BAHAN
Saklar Tunggal bh 1.000 Rp 17,500.00 Rp 17,500.00
Aksesories 10 % lot 1.000 Rp 1,750.00 Rp 1,750.00
JUMLAH HARGA BAHAN Rp 19,250.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 29,775.00


E Overhead & Profit 10% Rp 2,977.50
F Harga Satuan Pekerjaan (D+E) Rp 32,752.50

Pemasangan Saklar Double, Rp 41,827.50


No Uraian Satuan Koefisien HargaSatuan(Rp) JumlahHarga(Rp)
A TENAGA
Pekerja OH 0.05 Rp 86,600.00 Rp 4,330.00
Tukang Listrik OH 0.025 Rp 96,000.00 Rp 2,400.00
Kepala Tukang OH 0.025 Rp 101,000.00 Rp 2,525.00
Mandor OH 0.0127 Rp 100,000.00 Rp 1,270.00
JUMLAH TENAGA KERJA Rp 10,525.00
B BAHAN
Saklar Double bh 1.000 Rp 25,000.00 Rp 25,000.00
Aksesories 10 % lot 1.000 Rp 2,500.00 Rp 2,500.00
JUMLAH HARGA BAHAN Rp 27,500.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 38,025.00


E Overhead & Profit 10% Rp 3,802.50
F Harga Satuan Pekerjaan (D+E) Rp 41,827.50
Pemasangan stop kontak wall, Rp 47,877.50
No Uraian Satuan Koefisien HargaSatuan(Rp) JumlahHarga(Rp)
A TENAGA
Pekerja OH 0.05 Rp 86,600.00 Rp 4,330.00
Tukang Listrik OH 0.025 Rp 96,000.00 Rp 2,400.00
Kepala Tukang OH 0.025 Rp 101,000.00 Rp 2,525.00
Mandor OH 0.0127 Rp 100,000.00 Rp 1,270.00
JUMLAH TENAGA KERJA Rp 10,525.00
B BAHAN
Stop kontak wall bh 1.000 Rp 30,000.00 Rp 30,000.00
Aksesories 10 % lot 1.000 Rp 3,000.00 Rp 3,000.00
JUMLAH HARGA BAHAN Rp 33,000.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 43,525.00


E Overhead & Profit 10% Rp 4,352.50
F Harga Satuan Pekerjaan (D+E) Rp 47,877.50

Pemasangan stop kontak floor, Rp 556,077.50


No Uraian Satuan Koefisien HargaSatuan(Rp) JumlahHarga(Rp)
A TENAGA
Pekerja OH 0.05 Rp 86,600.00 Rp 4,330.00
Tukang Listrik OH 0.025 Rp 96,000.00 Rp 2,400.00
Kepala Tukang OH 0.025 Rp 101,000.00 Rp 2,525.00
Mandor OH 0.0127 Rp 100,000.00 Rp 1,270.00
JUMLAH TENAGA KERJA Rp 10,525.00
B BAHAN
Stop kontak floor bh 1.000 Rp 450,000.00 Rp 450,000.00
Aksesories 10 % lot 1.000 Rp 45,000.00 Rp 45,000.00
JUMLAH HARGA BAHAN Rp 495,000.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 505,525.00


E Overhead & Profit 10% Rp 50,552.50
F Harga Satuan Pekerjaan (D+E) Rp 556,077.50

Instalasi Penerangan dengan Kabel NYM 2x2,5 mm dalam Hi Pvc 20 mm, Rp 178,022.17
No Uraian Satuan Koefisien HargaSatuan(Rp) JumlahHarga(Rp)
A TENAGA
Pekerja OH 0.15 Rp 86,600.00 Rp 12,990.00
Tukang Listrik OH 0.01 Rp 96,000.00 Rp 960.00
Kepala Tukang OH 0.005 Rp 101,000.00 Rp 505.00
Mandor OH 0.005 Rp 100,000.00 Rp 500.00
JUMLAH TENAGA KERJA Rp 14,955.00
B BAHAN
Kabel NYM 2x2,5 mm m' 7.000 Rp 14,500.00 Rp 101,500.00
Hi Pvc dia. 20 mm m' 6.300 Rp 5,833.33 Rp 36,750.00
Pipa Flexible m' 1.000 Rp 6,000.00 Rp 6,000.00
Aksesories 10 % lot 1.000 Rp 2,633.33 Rp 2,633.33
JUMLAH HARGA BAHAN Rp 146,883.33
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 161,838.33


E Overhead & Profit 10% Rp 16,183.83
F Harga Satuan Pekerjaan (D+E) Rp 178,022.17
Instalasi Stop Kontak dengan Kabel NYM 3x2,5 mm dalam Hi Pvc 20 mm, Rp 243,197.17
No Uraian Satuan Koefisien HargaSatuan(Rp) JumlahHarga(Rp)
A TENAGA
Pekerja OH 0.15 Rp 86,600.00 Rp 12,990.00
Tukang Listrik OH 0.01 Rp 96,000.00 Rp 960.00
Kepala Tukang OH 0.005 Rp 101,000.00 Rp 505.00
Mandor OH 0.005 Rp 100,000.00 Rp 500.00
JUMLAH TENAGA KERJA Rp 14,955.00
B BAHAN
Kabel NYM 3x2,5 mm m' 10.000 Rp 14,500.00 Rp 145,000.00
Hi Pvc dia. 20 mm m' 9.000 Rp 5,833.33 Rp 52,500.00
Pipa Flexible m' 1.000 Rp 6,000.00 Rp 6,000.00
Aksesories 10 % lot 1.000 Rp 2,633.33 Rp 2,633.33
JUMLAH HARGA BAHAN Rp 206,133.33
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 221,088.33


E Overhead & Profit 10% Rp 22,108.83
F Harga Satuan Pekerjaan (D+E) Rp 243,197.17
Instalasi Power AC dengan Kabel NYM 3x2,5 mm dalam Hi Pvc 20 mm, Rp 351,822.17
No Uraian Satuan Koefisien HargaSatuan(Rp) JumlahHarga(Rp)
A TENAGA
Pekerja OH 0.15 Rp 86,600.00 Rp 12,990.00
Tukang Listrik OH 0.01 Rp 96,000.00 Rp 960.00
Kepala Tukang OH 0.005 Rp 101,000.00 Rp 505.00
Mandor OH 0.005 Rp 100,000.00 Rp 500.00
JUMLAH TENAGA KERJA Rp 14,955.00
B BAHAN
Kabel NYM 3x2,5 mm m' 15.000 Rp 14,500.00 Rp 217,500.00
Hi Pvc dia. 20 mm m' 13.500 Rp 5,833.33 Rp 78,750.00
Pipa Flexible m' 1.000 Rp 6,000.00 Rp 6,000.00
Aksesories 10 % lot 1.000 Rp 2,633.33 Rp 2,633.33
JUMLAH HARGA BAHAN Rp 304,883.33
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 319,838.33


E Overhead & Profit 10% Rp 31,983.83
F Harga Satuan Pekerjaan (D+E) Rp 351,822.17

Instalasi Power AC dengan Kabel NYM 4x2,5 mm dalam Hi Pvc 20 mm, Rp 566,322.17
No Uraian Satuan Koefisien HargaSatuan(Rp) JumlahHarga(Rp)
A TENAGA
Pekerja OH 0.15 Rp 86,600.00 Rp 12,990.00
Tukang Listrik OH 0.01 Rp 96,000.00 Rp 960.00
Kepala Tukang OH 0.005 Rp 101,000.00 Rp 505.00
Mandor OH 0.005 Rp 100,000.00 Rp 500.00
JUMLAH TENAGA KERJA Rp 14,955.00
B BAHAN
Kabel NYM 4x2,5 mm m' 15.000 Rp 27,500.00 Rp 412,500.00
Hi Pvc dia. 20 mm m' 13.500 Rp 5,833.33 Rp 78,750.00
Pipa Flexible m' 1.000 Rp 6,000.00 Rp 6,000.00
Aksesories 10 % lot 1.000 Rp 2,633.33 Rp 2,633.33
JUMLAH HARGA BAHAN Rp 499,883.33
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 514,838.33


E Overhead & Profit 10% Rp 51,483.83
F Harga Satuan Pekerjaan (D+E) Rp 566,322.17

Pemasangan 6,5" Ceilling speaker ,6/3/1,5W, White, Metal Rp 450,087.00


No Uraian Satuan Koefisien HargaSatuan(Rp) JumlahHarga(Rp)
A TENAGA
Pekerja OH 0.100 Rp 86,600.00 Rp 8,660.00
Tukang Listrik OH 0.150 Rp 96,000.00 Rp 14,400.00
Kepala Tukang OH 0.010 Rp 101,000.00 Rp 1,010.00
Mandor OH 0.001 Rp 100,000.00 Rp 100.00
JUMLAH TENAGA KERJA Rp 24,170.00
B BAHAN
6,5" Ceilling speaker ,6/3/1,5W, White, Metal unit 1.000 Rp 350,000.00 Rp 350,000.00
Aksesoris/ perlengkapan 10% lot 1.000 Rp 35,000.00 Rp 35,000.00
JUMLAH HARGA BAHAN Rp 385,000.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 409,170.00


E Overhead & Profit 10% Rp 40,917.00
F Harga Satuan Pekerjaan (D+E) Rp 450,087.00

Pemasangan Instalasi sound system Rp 318,816.67


No Uraian Satuan Koefisien HargaSatuan(Rp) JumlahHarga(Rp)
A TENAGA
Pekerja OH 0.5 Rp 86,600.00 Rp 43,300.00
Tukang Listrik OH 0.5 Rp 96,000.00 Rp 48,000.00
Kepala Tukang OH 0.25 Rp 101,000.00 Rp 25,250.00
Mandor OH 0.025 Rp 100,000.00 Rp 2,500.00
JUMLAH TENAGA KERJA Rp 119,050.00
B BAHAN
Kabel NYMHY 2x1,5 mm m' 10.000 Rp 11,000.00 Rp 110,000.00
Hi Pvc dia. 20 mm m' 9.000 Rp 5,833.33 Rp 52,500.00
Pipa Flexible m' 1.000 Rp 6,000.00 Rp 6,000.00
Aksesories 10 % lot 1.000 Rp 2,283.33 Rp 2,283.33
JUMLAH HARGA BAHAN Rp 170,783.33
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 289,833.33


E Overhead & Profit 10% Rp 28,983.33
F Harga Satuan Pekerjaan (D+E) Rp 318,816.67

Instalasi Data/Lan dengan Kabel CAT 5E dalam Hi Pvc 20 mm, Rp 379,137.00


No Uraian Satuan Koefisien HargaSatuan(Rp) JumlahHarga(Rp)
A TENAGA
Pekerja OH 0.150 Rp 86,600.00 Rp 12,990.00
Tukang Listrik OH 0.150 Rp 96,000.00 Rp 14,400.00
Kepala Tukang OH 0.180 Rp 101,000.00 Rp 18,180.00
Mandor OH 0.150 Rp 100,000.00 Rp 15,000.00
JUMLAH TENAGA KERJA Rp 60,570.00
B BAHAN
Kabel UTP cat.5E m' 30.000 Rp 4,000.00 Rp 120,000.00
Hi Pvc dia. 20 mm m' 27.000 Rp 5,833.33 Rp 157,500.00
Pipa Flexible m' 1.000 Rp 6,000.00 Rp 6,000.00
Aksesories 10 % lot 1.000 Rp 600.00 Rp 600.00
JUMLAH HARGA BAHAN Rp 284,100.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 344,670.00


E Overhead & Profit 10% Rp 34,467.00
F Harga Satuan Pekerjaan (D+E) Rp 379,137.00
Instalasi Uplink dengan Kabel CAT 6E dalam Hi Pvc 20 mm, Rp 395,637.00
No Uraian Satuan Koefisien HargaSatuan(Rp) JumlahHarga(Rp)
A TENAGA
Pekerja OH 0.150 Rp 86,600.00 Rp 12,990.00
Tukang Listrik OH 0.150 Rp 96,000.00 Rp 14,400.00
Kepala Tukang OH 0.180 Rp 101,000.00 Rp 18,180.00
Mandor OH 0.150 Rp 100,000.00 Rp 15,000.00
JUMLAH TENAGA KERJA Rp 60,570.00
B BAHAN
Kabel UTP cat.6E m' 30.000 Rp 4,500.00 Rp 135,000.00
Hi Pvc dia. 20 mm m' 27.000 Rp 5,833.33 Rp 157,500.00
Pipa Flexible m' 1.000 Rp 6,000.00 Rp 6,000.00
Aksesories 10 % lot 1.000 Rp 600.00 Rp 600.00
JUMLAH HARGA BAHAN Rp 299,100.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 359,670.00


E Overhead & Profit 10% Rp 35,967.00
F Harga Satuan Pekerjaan (D+E) Rp 395,637.00

Pemasangan Wallmount Rack Switch Indorack 8U single Door Rp 2,547,127.00


No Uraian Satuan Koefisien HargaSatuan(Rp) JumlahHarga(Rp)
A TENAGA
Pekerja OH 0.150 Rp 86,600.00 Rp 12,990.00
Tukang Listrik OH 0.150 Rp 96,000.00 Rp 14,400.00
Kepala Tukang OH 0.180 Rp 101,000.00 Rp 18,180.00
Mandor OH 0.150 Rp 100,000.00 Rp 15,000.00
JUMLAH TENAGA KERJA Rp 60,570.00
B BAHAN
Wallmount Rack Switch Indorack 8U single Door unit 1.000 Rp 2,050,000.00 Rp 2,050,000.00
Aksesories 10 % lot 1.000 Rp 205,000.00 Rp 205,000.00
JUMLAH HARGA BAHAN Rp 2,255,000.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 2,315,570.00


E Overhead & Profit 10% Rp 231,557.00
F Harga Satuan Pekerjaan (D+E) Rp 2,547,127.00

Pemasangan Switch Hub 8 port Rp 2,184,127.00


No Uraian Satuan Koefisien HargaSatuan(Rp) JumlahHarga(Rp)
A TENAGA
Pekerja OH 0.150 Rp 86,600.00 Rp 12,990.00
Tukang Listrik OH 0.150 Rp 96,000.00 Rp 14,400.00
Kepala Tukang OH 0.180 Rp 101,000.00 Rp 18,180.00
Mandor OH 0.150 Rp 100,000.00 Rp 15,000.00
JUMLAH TENAGA KERJA Rp 60,570.00
B BAHAN
Switch Hub 8 port unit 1.000 Rp 1,750,000.00 Rp 1,750,000.00
Aksesories 10 % lot 1.000 Rp 175,000.00 Rp 175,000.00
JUMLAH HARGA BAHAN Rp 1,925,000.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 1,985,570.00


E Overhead & Profit 10% Rp 198,557.00
F Harga Satuan Pekerjaan (D+E) Rp 2,184,127.00
Pemasangan Wireless MU-MIMO wave 2 Gigabit PoE + Access Point- 2,4 GHz / 5 GHz Rp 1,131,427.00
No Uraian Satuan Koefisien HargaSatuan(Rp) JumlahHarga(Rp)
A TENAGA
Pekerja OH 0.150 Rp 86,600.00 Rp 12,990.00
Tukang Listrik OH 0.150 Rp 96,000.00 Rp 14,400.00
Kepala Tukang OH 0.180 Rp 101,000.00 Rp 18,180.00
Mandor OH 0.150 Rp 100,000.00 Rp 15,000.00
JUMLAH TENAGA KERJA Rp 60,570.00
B BAHAN
Wireless MU-MIMO wave 2 Gigabit PoE + Access Point- 2,4 GHz unit 1.000 Rp 880,000.00 Rp 880,000.00
Aksesories 10 % lot 1.000 Rp 88,000.00 Rp 88,000.00
JUMLAH HARGA BAHAN Rp 968,000.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 1,028,570.00


E Overhead & Profit 10% Rp 102,857.00
F Harga Satuan Pekerjaan (D+E) Rp 1,131,427.00

Pemasangan Socket Data Wall Rp 205,777.00


No Uraian Satuan Koefisien HargaSatuan(Rp) JumlahHarga(Rp)
A TENAGA
Pekerja OH 0.150 Rp 86,600.00 Rp 12,990.00
Tukang Listrik OH 0.150 Rp 96,000.00 Rp 14,400.00
Kepala Tukang OH 0.180 Rp 101,000.00 Rp 18,180.00
Mandor OH 0.150 Rp 100,000.00 Rp 15,000.00
JUMLAH TENAGA KERJA Rp 60,570.00
B BAHAN
Socket Data unit 1.000 Rp 115,000.00 Rp 115,000.00
Aksesories 10 % lot 1.000 Rp 11,500.00 Rp 11,500.00
JUMLAH HARGA BAHAN Rp 126,500.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 187,070.00


E Overhead & Profit 10% Rp 18,707.00
F Harga Satuan Pekerjaan (D+E) Rp 205,777.00

Pemasangan Socket Data Lantai + Socket Power Rp 974,127.00


No Uraian Satuan Koefisien HargaSatuan(Rp) JumlahHarga(Rp)
A TENAGA
Pekerja OH 0.150 Rp 86,600.00 Rp 12,990.00
Tukang Listrik OH 0.150 Rp 96,000.00 Rp 14,400.00
Kepala Tukang OH 0.180 Rp 101,000.00 Rp 18,180.00
Mandor OH 0.150 Rp 100,000.00 Rp 15,000.00
JUMLAH TENAGA KERJA Rp 60,570.00
B BAHAN
Socket Data Lantai + Socket Power unit 1.000 Rp 750,000.00 Rp 750,000.00
Aksesories 10 % lot 1.000 Rp 75,000.00 Rp 75,000.00
JUMLAH HARGA BAHAN Rp 825,000.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 885,570.00


E Overhead & Profit 10% Rp 88,557.00
F Harga Satuan Pekerjaan (D+E) Rp 974,127.00

Pemasangan NVR, 8ch, 1HDD Rp 2,609,728.00


No Uraian Satuan Koefisien HargaSatuan(Rp) JumlahHarga(Rp)
A TENAGA
Pekerja OH 0.500 Rp 86,600.00 Rp 43,300.00
Tukang Listrik OH 1.000 Rp 96,000.00 Rp 96,000.00
Kepala Tukang OH 0.180 Rp 101,000.00 Rp 18,180.00
Mandor OH 0.150 Rp 100,000.00 Rp 15,000.00
JUMLAH TENAGA KERJA Rp 172,480.00
B BAHAN
NVR, 8ch, 1HDD unit 1.000 Rp 2,000,000.00 Rp 2,000,000.00
Aksesories 10 % lot 1.000 Rp 200,000.00 Rp 200,000.00
JUMLAH HARGA BAHAN Rp 2,200,000.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 2,372,480.00


E Overhead & Profit 10% Rp 237,248.00
F Harga Satuan Pekerjaan (D+E) Rp 2,609,728.00
Pemasangan Led Monitor CCTV 32 inch, Rp 3,214,728.00
No Uraian Satuan Koefisien HargaSatuan(Rp) JumlahHarga(Rp)
A TENAGA
Pekerja OH 0.500 Rp 86,600.00 Rp 43,300.00
Tukang Listrik OH 1.000 Rp 96,000.00 Rp 96,000.00
Kepala Tukang OH 0.180 Rp 101,000.00 Rp 18,180.00
Mandor OH 0.150 Rp 100,000.00 Rp 15,000.00
JUMLAH TENAGA KERJA Rp 172,480.00
B BAHAN
Led Monitor CCTV 32 inch, unit 1.000 Rp 2,500,000.00 Rp 2,500,000.00
Aksesories 10 % lot 1.000 Rp 250,000.00 Rp 250,000.00
JUMLAH HARGA BAHAN Rp 2,750,000.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 2,922,480.00


E Overhead & Profit 10% Rp 292,248.00
F Harga Satuan Pekerjaan (D+E) Rp 3,214,728.00

Pemasangan witch Hub 8 Port Rp 2,004,728.00


No Uraian Satuan Koefisien HargaSatuan(Rp) JumlahHarga(Rp)
A TENAGA
Pekerja OH 0.500 Rp 86,600.00 Rp 43,300.00
Tukang Listrik OH 1.000 Rp 96,000.00 Rp 96,000.00
Kepala Tukang OH 0.180 Rp 101,000.00 Rp 18,180.00
Mandor OH 0.150 Rp 100,000.00 Rp 15,000.00
JUMLAH TENAGA KERJA Rp 172,480.00
B BAHAN
witch Hub 8 Port unit 1.000 Rp 1,500,000.00 Rp 1,500,000.00
Aksesories 10 % lot 1.000 Rp 150,000.00 Rp 150,000.00
JUMLAH HARGA BAHAN Rp 1,650,000.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 1,822,480.00


E Overhead & Profit 10% Rp 182,248.00
F Harga Satuan Pekerjaan (D+E) Rp 2,004,728.00

Pemasangan 4 MP Fixed Dome AI network Camera Two-way Talk, AI-Powered, Support PoE,multiple user Rp 1,484,428.00
No Uraian Satuan Koefisien HargaSatuan(Rp) JumlahHarga(Rp)
A TENAGA
Pekerja OH 0.500 Rp 86,600.00 Rp 43,300.00
Tukang Listrik OH 1.000 Rp 96,000.00 Rp 96,000.00
Kepala Tukang OH 0.180 Rp 101,000.00 Rp 18,180.00
Mandor OH 0.150 Rp 100,000.00 Rp 15,000.00
JUMLAH TENAGA KERJA Rp 172,480.00
B BAHAN
4 MP Fixed Dome AI network Camera Two-way Talk, AI-Powered, unit 1.000 Rp 1,070,000.00 Rp 1,070,000.00
Aksesories 10 % lot 1.000 Rp 107,000.00 Rp 107,000.00
JUMLAH HARGA BAHAN Rp 1,177,000.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 1,349,480.00


E Overhead & Profit 10% Rp 134,948.00
F Harga Satuan Pekerjaan (D+E) Rp 1,484,428.00
Instalasi CCTV dengan Kabel CAT 6E dalam Hi Pvc 20 mm, Rp 389,018.67
No Uraian Satuan Koefisien HargaSatuan(Rp) JumlahHarga(Rp)
A TENAGA
Pekerja OH 0.150 Rp 86,600.00 Rp 12,990.00
Tukang Listrik OH 0.150 Rp 96,000.00 Rp 14,400.00
Kepala Tukang OH 0.180 Rp 101,000.00 Rp 18,180.00
Mandor OH 0.150 Rp 100,000.00 Rp 15,000.00
JUMLAH TENAGA KERJA Rp 60,570.00
B BAHAN
Kabel UTP cat.6E m' 30.000 Rp 4,500.00 Rp 135,000.00
Hi Pvc dia. 20 mm m' 27.000 Rp 5,833.33 Rp 157,500.00
Aksesories 10 % lot 1.000 Rp 583.33 Rp 583.33
JUMLAH HARGA BAHAN Rp 293,083.33
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 353,653.33


E Overhead & Profit 10% Rp 35,365.33
F Harga Satuan Pekerjaan (D+E) Rp 389,018.67
Pemasangan Pipa Metal dia. 3 inch Rp 152,322.94
No Uraian Satuan Koefisien HargaSatuan(Rp) JumlahHarga(Rp)
A TENAGA
Pekerja OH 0.054 Rp 86,600.00 Rp 4,676.40
Tukang Pipa OH 0.09 Rp 96,000.00 Rp 8,640.00
Kepala Tukang OH 0.009 Rp 101,000.00 Rp 909.00
Mandor OH 0.027 Rp 100,000.00 Rp 2,700.00
JUMLAH TENAGA KERJA Rp 16,925.40
B BAHAN
PipaMetal dia. 3 inch m' 1.200 Rp 93,500.00 Rp 112,200.00
Aksesoris/ perlengkapan 10% lot 1.000 Rp 9,350.00 Rp 9,350.00
JUMLAH HARGA BAHAN Rp 121,550.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 138,475.40


E Overhead & Profit 10% Rp 13,847.54
F Harga Satuan Pekerjaan (D+E) Rp 152,322.94

Pemasangan stop kontak AC, Rp 126,527.50


No Uraian Satuan Koefisien HargaSatuan(Rp) JumlahHarga(Rp)
A TENAGA
Pekerja OH 0.05 Rp 86,600.00 Rp 4,330.00
Tukang Listrik OH 0.025 Rp 96,000.00 Rp 2,400.00
Kepala Tukang OH 0.025 Rp 101,000.00 Rp 2,525.00
Mandor OH 0.0127 Rp 100,000.00 Rp 1,270.00
JUMLAH TENAGA KERJA Rp 10,525.00
B BAHAN
Stop kontak AC bh 1.000 Rp 95,000.00 Rp 95,000.00
Aksesories 10 % lot 1.000 Rp 9,500.00 Rp 9,500.00
JUMLAH HARGA BAHAN Rp 104,500.00
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -

D Jumlah (A+B+C) Rp 115,025.00


E Overhead & Profit 10% Rp 11,502.50
F Harga Satuan Pekerjaan (D+E) Rp 126,527.50
Lokasi : YOGYAKARTA
DAFTAR HARGA
UPAH DAN
lokasi KOTA BAHAN Owner :
ARSITEKTUR
Tahun : 2023

NO URAIAN SPESIFIKASI BAHAN SATUAN HARGA SATUAN

A. UPAH TENAGA
1 Mandor OH Rp 100,000.00
2 Kepala Tukang Batu OH Rp 101,000.00
3 Kepala Tukang Kayu OH Rp 106,000.00
4 Kepala Tukang Besi OH Rp 101,000.00
5 Kepala Tukang Cat OH Rp 98,000.00
6 Kepala Tukang Pipa OH Rp 101,000.00
7 Kepala Tukang listrik OH Rp 101,000.00
8 Tukang Batu OH Rp 96,000.00
9 Tukang Kayu OH Rp 98,000.00
10 Tukang Besi OH Rp 97,000.00
11 Tukang Cat OH Rp 90,000.00
12 Tukang Listrik OH Rp 96,000.00
13 Tukang pipa OH Rp 96,000.00
14 Pekerja OH Rp 86,600.00

B.1 BAHAN DASAR


1 Pasir Cor / Pasir Beton m3 Rp 275,000.00
2 Pasir Pasang m3 Rp 215,000.00
3 Kerikil Beton m3 Rp 210,833.33
4 Sirtu m3 Rp 183,000.00
5 Batu Belah 15/20 m3 Rp 194,444.44
6 Bata Ringan bj Rp 8,400.00
7 Bata terakota bj Rp 1,250.00
8 Batu bata bj Rp 833.00
9 Batu Alam m2 Rp 200,000.00
10 Tanah Urug m3 Rp 112,900.00
11 Mortar Siap Pakai ( Perekat Bata Ringan ) kg Rp 1,500.00
12 Mortar siap Pakai ( Plesteran ) kg Rp 1,250.00
13 Mortar siap Pakai ( Acian kg Rp 1,875.00
14 Semen Portland (PC) kg Rp 1,275.00
15 Semen Portland (PC) Warna kg Rp 15,700.00

B.2 BAHAN BESI


1 Besi Beton kg Rp 12,000.00
2 Besi D16 kg Rp 18,730.00
3 Besi siku 40x40 m' Rp 76,000.00
4 Plat Baja kg Rp 17,820.00
5 Besi Strip kg Rp 58,000.00
6 Kawat Ikat Beton kg Rp 21,900.00
7 Paku 1" s/d 4" kg Rp 23,500.00
8 Paku Payung kg Rp 46,000.00
9 Paku Beton bh Rp 1,200.00
10 Wiremesh m2 Rp 160,000.00
11 Kawat Las kg Rp 25,000.00
12 Hollow Galvanis 20x20cm, t= 0.2 m' Rp 4,166.67
13 Hollow Galvanis 1,5 x 3,0 cm m1 Rp 3,500.00
14 Hollow Galvanis 3,0 x 3,0 cm m1 Rp 7,300.00
15 Hollow Galvanis 2,0 x 4,0 cm m2 Rp 3,500.00
16 Hollo 35x35x0,35 mm m' Rp 11,000.00
17 Hollo 20x40x2.0 mm m' Rp 16,500.00
18 Hollo 30x30x1.7 mm m' Rp 26,400.00
19 Hollow 40x40 cm 1.1mm m' Rp 33,666.67
20 Hollo 40x40x2 mm m' Rp 45,000.00
21 Hollo 40x60 m' Rp 213,332.00
22 Hollo 50x100x1.8 mm m' Rp 50,000.00
23 Baja ringan C.75. 75 btg Rp 125,000.00
24 Baja ringan C.75. 100 btg Rp 185,000.00
25 Reng baja ringan R.33.45 btg Rp 52,000.00
26 Dynabolt bh Rp 3,600.00
27 Paku skrup anti karat kg Rp 23,500.00
28 Paku skrup bj Rp 700.00
29 Sekrup Fixer bks Rp 12,000.00
30 Braket Siku / spigot / stiffener btg Rp 62,000.00
31 Pipa Besi 1/2" m' Rp 35,000.00
32 Pipa galvanis 2inch m' Rp 83,783.33
33 Wiremesh M8 m2 Rp 52,000.00
34 Besi Iwf 150.75.5,0.7 kg Rp 14,500.00
35 Besi CNP C125.50.20.2,3 kg Rp 13,500.00
36 Plat besi tebal 0.8mm lbr Rp 392,700.00
37 Plat Besi tebal 10mm kg Rp 8,652.36
38 Rockfon Artic 600 x 600 m2 Rp 95,000.00
39 Cross tee main tee m' Rp 46,000.00
40 Baut bh Rp 1,000.00
41 List stainless m1 Rp 115,000.00
42 Seng plat m1 Rp 22,500.00
43 Baut+Muur M16 Mutu tinggi bh Rp 9,000.00
44 Usuk Reng Baja Ringan sekualitas Gigasteel m2 Rp 145,000.00
45 Angkur Baut D19 bh Rp 85,000.00
46 Pelat Plendes Tebal 16mm, ukuran 250x250mm bh Rp 350,000.00
47 pipa stainless 2" m Rp 62,500.00
48 Seng Gelombang lbr Rp 80,000.00

B.2 BAHAN ALUMUNIUM


1 Profil Kusen Alumunium 3" m' Rp 32,500.00
2 Profil Kusen Aluminium 4" m' Rp 34,166.67
3 Profil Kusen Besi tebal 2" m' Rp 225,000.00
4 Profile Frame Jendela Allumunium 3/8 m' Rp 60,000.00
5 Profile Frame Jendela Allumunium 3/10 m' Rp 180,000.00
6 Profil Kaca m' Rp 97,000.00
7 talang 1/2 Lingkaran D-30 m' Rp 135,000.00
8 ACP alloy 5005 self clean m' Rp 494,000.00
9 Talang ½ lingkaran D-30 cm Galvalum m' Rp 135,000.00
10 cutting acp m2 Rp 189,000.00
11 sealent tube Rp 36,000.00
12 kaca Es t = 5mm m2 Rp 150,000.00
B.2 BAHAN KACA
1 Seal Kaca (karet) m' Rp 5,200.00
2 Kaca t = 8 mm m2 Rp 295,000.00
3 Kaca t = 5 mm m2 Rp 130,000.00
4 Kaca t = 10 mm m2 Rp 408,000.00
5 Kaca tempered 8 mm m2 Rp 485,000.00
6 Kaca tempered 12 mm m2 Rp 620,000.00
7 Kaca cermin m2 Rp 110,000.00
8 Sunblasing m2 Rp 36,000.00
9 kaca Es t = 8mm m2 Rp 430,000.00

B.2 BAHAN PENUTUP ATAP


1 Penutup Atap Genteng Beton Romana Light bh Rp 15,000.00
2 Nok Beton / Ridge Monier lbr Rp 21,000.00

B.3 BAHAN KAYU


1 Kayu glugu m3 Rp 1,570,000.00
2 Papan Kayu Kelas III (Bekisting) m3 Rp 1,570,000.00
3 Balok Kayu Kelas II (Bekisting) m3 Rp 1,920,000.00
4 Penjaga Jarak Bekisting bh Rp 250.00
5 Balok Kayu jati m3 Rp 16,606,000.00
6 Papan Kayu Bengkirai m3 Rp 13,000,000.00
7 Plywood / Multiplek tbl 18 mm lbr Rp 283,200.00
8 Plywood / Multiplek tbl 12 mm lbr Rp 185,000.00
9 Plywood / Multiplek tbl 9 mm lbr Rp 149,500.00
10 Plywood / Multiplek tbl 6 mm lbr Rp 94,300.00
11 Plywood / Multiplek tbl 4 mm lbr Rp 71,300.00
12 Plywood / Multiplek tbl 3 mm lbr Rp 58,700.00
13 Kayu Dolken bar Rp 20,000.00
14 Bambu btg Rp 13,110.00
15 Alumunium Composite (ACP) Alloy 5005 Self clean m2 Rp 485,000.00
16 Cuting ACP m2 Rp 183,500.00
17 ACP Perforated Alloy 5005 Self clean m2 Rp 1,200,000.00
18 ACP Indor m2 Rp 187,841.53
19 Papan Kayu Kamper m3 Rp 11,471,250.00
20 Balok 2/3 kamper m3 Rp 9,200,000.00
21 Kusen pintu kecil unit Rp 1,350,000.00
22 Phenolite board m2 Rp 750,000.00
23 Multiplek 8mm + HPL m2 Rp 500,000.00
24 Loster lubang angin bh Rp 60,000.00
25 Plint Kayu m' Rp 100,000.00
26 Parquet lantai m2 Rp 275,000.00
27 HPL m2 Rp 255,000.00

B.3 BAHAN GYPSUM DAN GRC


1 kalsiplank lebar 30 cm m' Rp 96,000.00
2 GRC m2 Rp 680,000.00
3 GRC Cetak m2 Rp 450,000.00
4 GRC 4mm Rp 250,000.00
5 Gypsum 9mm lbr Rp 88,500.00
6 Kalsiboard 6 mm lbr Rp 135,135.00
7 Kalsiboard 8 mm lbr Rp 163,000.00
8 List profil Gypsum m' Rp 18,500.00
9 Tepung Gypsum kg Rp 4,500.00
10 Alkasit bks Rp 24,000.00
11 Kasa Gypsum roll Rp 13,500.00
12 Plafon PVC m2 Rp 105,000.00
13 List Plafon PVC m1 Rp 10,000.00
14 Concrete Plank m' Rp 157,000.00

B.3 BAHAN CAT


1 Plamur tembok kg Rp 34,000.00
2 Amplas lbr Rp 4,000.00
3 Plamur kayu kg Rp 31,100.00
4 Cat Dinding Nippon Paint kg Rp 34,000.00
5 Cat Dinding eksterior Nippon Paint kg Rp 127,000.00
6 Cat plafond kg Rp 34,650.00
7 Wallpaper m2 Rp 118,000.00
8 Cat Meni kg Rp 57,500.00
9 Cat emco kg Rp 57,500.00
10 Lem Kayu kg Rp 17,500.00
11 Lem karet kg Rp 50,000.00
12 Lem Wallpaper kg Rp 50,000.00
13 Minyak cat lt Rp 18,000.00
14 Meni kayu kg Rp 45,000.00
15 Cat duco kg Rp 115,000.00
16 Clear kg Rp 95,000.00
17 Dempul kg Rp 38,500.00
18 Vernis ltr Rp 72,000.00
19 Cat Coating kg Rp 90,000.00
20 Elastex Fiber Flex PU kg Rp 63,000.00
21 Elastex Nippocem kg Rp 13,500.00
22 fiber m2 Rp 27,000.00
23 wood feller bks Rp 7,000.00
24 cat alkali kg Rp 25,000.00
25 cat wathershield kg Rp 85,000.00
26 Lem aibon kg Rp 50,000.00

B.3 BAHAN KERAMIK


1 Keramik Lantai 600x600 polished m2 Rp 121,000.00
2 Keramik Lantai 600x600 Unpolished m2 Rp 125,000.00
3 Keramik 400x400 AntiSlip m2 Rp 95,000.00
4 Keramik 400x400 Polished m2 Rp 87,000.00
5 Granit tile 800x800 Polished m2 Rp 215,000.00
6 Granit tile 200x400 Dinding polished m2 Rp 70,000.00
7 Plint Granit 100x600 bh Rp 25,000.00
8 stepnoshing granit tangga m' Rp 40,000.00
9 Dinding granit 600/600 m2 Rp 150,000.00
10 List dinding 100x200 bh Rp 16,000.00
11 Batu Alam m2 Rp 170,000.00
12 Batu pecah lantai alam m2 Rp 160,000.00
13 Guiding Block Line type (Rubber) m2 Rp 170,000.00
14 Guiding Block spot type (Rubber) bh Rp 170,000.00
15 Granit tile 600x600 polished Motif Marmer m2 Rp 256,000.00
B.3 BAHAN BETON PRACETAK
1 Buis Beton 80 cm - 40 cm bh Rp 86,300.00
2 Buis Beton cover Dia 80 cm unit Rp 109,300.00
3 Ornamen GRC m2 Rp 450,000.00
4 Profil lisplank beton besar m1 Rp 215,000.00
5 Profil lisplank beton kecil m1 Rp 95,000.00
6 Roster Beton bh Rp 12,000.00
7 Buis Beton 20cm bh Rp 50,000.00
8 Glassblock 20x20 bh Rp 30,000.00

B.3 BAHAN SANITAIR


1 Pipa Steinless 1" m' Rp 38,000.00
2 Bak cuci steinless unit Rp 185,000.00
3 Bio Septictank 1000 liter unit Rp 2,950,000.00
B.3 BAHAN ALAT PENGGANTUNG DAN PENGUNCI
1 Pintu steel Door singgle unit Rp 5,520,000.00
2 Pintu steel Door double unit Rp 10,032,000.00
3 Pintu shaf aluminium single unit Rp 480,000.00
4 Pintu Aluminium Single unit Rp 2,649,000.00
5 Pintu Aluminium Double unit Rp 3,670,001.00
6 Wadja Doors unit Rp 950,000.00
7 Pintu Engineering Door Double unit Rp 5,000,000.00
8 Pintu Engineering Door Single unit Rp 2,350,000.00
9 accecories Pintu steel door pck Rp 550,000.00
10 Pintu besi tahan api double unit Rp 11,500,000.00
11 Accecories Pintu Tahan Api pck Rp 750,000.00
12 Pintu UPVC set Rp 2,200,000.00
13 Fitting Kolf set Rp 675,000.00
14 Engsel Pintu Besi bh Rp 50,000.00
15 Engsel Pintu Besar bh Rp 20,700.00
16 Engsel Pintu kecil bh Rp 11,500.00
17 Engsel Jendela besar bh Rp 65,000.00
18 Engsel Jendela kecil bh Rp 28,500.00
19 Handle Pintu set Rp 120,000.00
20 Handle Jendela set Rp 56,000.00
21 Lockcase Pintu dea set Rp 135,000.00
22 Rel pintu geser m1 Rp 500,000.00
23 Spring Knip set Rp 14,000.00
24 Kait Angin set Rp 18,000.00
25 Kaki cubicle bh Rp 165,000.00
26 Engsel cubicle bh Rp 295,000.00
27 Double cylinder bh Rp 400,000.00
28 Door Closer bh Rp 170,000.00
29 Flush bolt bh Rp 125,000.00
30 Glass Connection bh Rp 65,000.00
31 Lock set unit Rp 135,000.00
32 Coat hook bh Rp 25,000.00
33 Floor Hinges set Rp 1,750,000.00
34 Overpanel set Rp 980,000.00
35 Top Patch Fitting set Rp 875,000.00
36 Bottom Patch Fitting set Rp 875,000.00
37 Bottom Patch Lock + Cylinder set Rp 1,350,000.00
38 Pull Handle (45cm) set Rp 548,400.00
39 Sandblasting m2 Rp 95,000.00
B.4 BAHAN LAIN-LAIN
1 Pompa Readymix (Sewa) lot Rp 3,600,000.00
2 Alat Las (Sewa) jam Rp 61,875.00
3 Minyak Bekisting ltr Rp 14,000.00
4 Minyak Pelumas ltr Rp 35,000.00
5 Premium (Industri) ltr Rp 8,500.00
6 Solar non subsidi ltr Rp 9,500.00
7 Air ltr Rp 3.45
8 Sealant tube Rp 36,000.00
9 Ijuk kg Rp 18,400.00
10 Body Shower unit Rp 4,550,000.00
11 Closet duduk unit Rp 1,344,000.00
12 Washtafel unit Rp 555,000.00
13 Kran 1/2" unit Rp 165,000.00
14 Kran air Washtafel unit Rp 196,000.00
15 Floor drain unit Rp 249,000.00
16 Roof Drain unit Rp 275,000.00
17 Tandon Air 2000L unit Rp 2,900,000.00
18 Anti rayap m2 Rp 28,000.00
19 Huruf Stainless /cm cm Rp 4,500.00
20 Cleanol F /Pre Treatment Ltr Rp 180,000.00
21 First Layer Polycor PFP 261 Kg Rp 57,120.00
22 Second Layer PollyFloor PFM 232 Kg Rp 83,800.00
23 Epoxi Finish Coat PollyFloor 213 Kg Rp 138,000.00
24 Thinner Epoxy Ltr Rp 45,000.00
25 Vinyl uk 15 cm x 80 cm, Tebal 5mm m2 Rp 176,646.71
Lokasi : KOTA YOGYAKARTA
DAFTAR HARGA UPAH DAN
Lokasi Kota BAHAN Owner :
Tahun : 2023

NO URAIAN SPESIFIKASI BAHAN SATUAN HARGA SATUAN

A. UPAH TENAGA
1 Mandor OH Rp 100,000.00
2 Kepala Tukang Batu OH Rp 101,000.00
3 Kepala Tukang Kayu OH Rp 106,000.00
4 Kepala Tukang Besi OH Rp 101,000.00
5 Kepala Tukang Cat OH Rp 98,000.00
6 Kepala Tukang Pipa OH Rp 101,000.00
7 Kepala Tukang listrik OH Rp 101,000.00
8 Tukang Batu OH Rp 96,000.00
9 Tukang Kayu OH Rp 98,000.00
10 Tukang Besi OH Rp 97,000.00
11 Tukang Cat OH Rp 90,000.00
12 Tukang Listrik OH Rp 96,000.00
13 Tukang pipa OH Rp 96,000.00
14 Pekerja OH Rp 86,600.00

B.1 BAHAN DASAR


1 Pasir Cor / Pasir Beton m3 Rp 275,000.00
2 Pasir Pasang m3 Rp 215,000.00
3 Kerikil Beton m3 Rp 210,833.33
4 Sirtu m3 Rp 183,000.00
5 Batu Belah 15/20 m3 Rp 194,444.44
6 Tanah Urug m3 Rp 112,900.00
7 Semen Portland (PC) kg Rp 1,275.00
8 Beton Ready Mix K-300 / f'c 25 Mpa m3 Rp 780,000.00
9 Beton Ready Mix K-275 / f'c 22.8 Mpa m3 Rp 770,000.00
10 Beton Ready Mix K-250 / f'c 20.75 Mpa m3 Rp 765,000.00
11 Beton Ready Mix K-200 / f'c 16.60 Mpa m3 Rp 745,000.00
B.2 BAHAN BESI
1 Besi Beton kg Rp 11,500.00
2 Baja IWF kg Rp 17,820.00
3 Plat Baja kg Rp 17,820.00
4 Besi Strip kg Rp 17,820.00
5 Kawat Ikat Beton kg Rp 17,250.00
6 Paku 1" s/d 4" kg Rp 16,100.00
7 Paku Payung kg Rp 28,750.00
8 Paku Sekrup kg Rp 23,000.00
9 Paku Beton kg Rp 23,000.00
10 Kawat Las kg Rp 25,000.00
B.3 BAHAN KAYU
1 Kayu glugu balok m3 Rp 1,570,000.00
2 Balok Kayu Kelas II (Bekisting) m3 Rp 1,920,000.00
3 Penjaga Jarak Bekisting bh Rp 250.00
4 Plywood / Multiplek tbl 12 mm lbr Rp 184,000.00
5 Plywood / Multiplek tbl 9 mm lbr Rp 149,500.00
6 Plywood / Multiplek tbl 6 mm lbr Rp 70,000.00
7 Plywood / Multiplek tbl 4 mm lbr Rp 60,000.00
8 Plywood / Multiplek tbl 3 mm lbr Rp 57,500.00
9 Kayu Dolken bar Rp 20,000.00
10 Bambu btg Rp 13,110.00
B.4 BAHAN LAIN-LAIN
1 Pompa Readymix (Sewa) lot Rp 3,600,000.00
2 Alat Las (Sewa) jam Rp 61,875.00
3 Minyak Bekisting ltr Rp 13,000.00
4 Minyak Pelumas ltr Rp 35,000.00
5 Premium (Industri) ltr Rp 8,500.00
6 Solar (Industri) ltr Rp 10,500.00
7 Air ltr Rp 3.45
DAFTAR HARGA SATUAN BAHAN DAN UPAH ME
NO. URAIAN SATUAN HARGA ( Rp ) KETERANGAN
1 2 3 5
UPAH
1 Mandor oh Rp 100,000.00
2 Kepala Tukang Pipa oh Rp 101,000.00
3 Kepala Tukang listrik oh Rp 101,000.00
4 Tukang Pipa oh Rp 96,000.00
5 Tukang Listrik oh Rp 96,000.00
6 Pekerja oh Rp 86,600.00

BAHAN
ALAT ELECRIKAK
1 Isolasi bh Rp 7,500.00
2 Inbodos / Teedos bh Rp 5,500.00
3 Roset bh Rp 1,500.00
4 Kabel NYY 4 x 16 mm2 m' Rp 148,000.00
5 Kabel NYY 4 x 25 mm2 m' Rp 265,000.00
6 Kabel BC 4 mm2 m' Rp 7,500.00
7 Kabel NYM 2 x 2.5 mm² m' Rp 14,500.00
8 Kabel NYM 3 x 2.5 mm² m' Rp 18,275.00
9 Kabel NYM 4 x 2.5 mm² m' Rp 27,500.00
10 Kabel NYMHY 2 x 1.5 mm² m' Rp 11,000.00
11 Kabel STP AWG 18 m' Rp 5,500.00
12 Kabel telepon 2 x 2 x 0.6 mm Ex. Supreme m' Rp 3,500.00
13 Kabel UTP cat.5E m Rp 4,000.00
14 Kabel UTP cat.6E m Rp 4,500.00
15 Kabel ITC 20 x 2 x 0.6 mm m' Rp 150,000.00
16 Pipa PVC 20mm² Ex Clipsal btg Rp 14,000.00
17 Material bantu T doos, sock, lem m3 Rp 7,500.00
18 MCCB 20A/3P/3T/7.5kA Ex. Merlin Gerin / Schaeneider bh Rp 270,000.00
19 MCCB 50A/3P/3T/18kA Ex. Merlin Gerin / Schaeneider bh Rp 675,000.00
20 MCCB 100A/3P/3T/36kA Ex. Merlin Gerin / Schaeneider bh Rp 1,550,000.00
21 MCB 10 A/1 ph/2K/6 ka Ex. Merlin Gerin / Schaeneider bh Rp 105,000.00
22 Box panel 500 x 700 x 200 type Wall mounted bh Rp 1,250,000.00
23 Switch Selector bh Rp 125,000.00
24 Fuse Lamp bh Rp 25,000.00
25 Indicator Lamp bh Rp 15,000.00
26 Ampermeter Ex. Otto bh Rp 125,000.00
27 Voltmeter Ex. Otto bh Rp 125,000.00
28 Frequensimeter bh Rp 750,000.00
29 CT 250 - 500 /5 Amp bh Rp 150,000.00
30 Stop kontak wall bh Rp 30,000.00
31 Stop kontak floor bh Rp 450,000.00
32 Saklar Tunggal bh Rp 17,500.00
33 Saklar Seri bh Rp 25,000.00
34 Socket Data bh Rp 115,000.00
35 Socket Data Lantai + Socket Power bh Rp 750,000.00
36 Socket Telepon bh Rp 45,000.00
37 Stop kontak AC bh Rp 85,000.00
38 RM SLIM LED PANEL 45 Watt unit Rp 620,000.00
39 Lampu DL RECESSED, SMART BRIGHT 24W, 600lm, D150 unit Rp 220,000.00
40 Lampu DL SURFACE, SMART BRIGHT 12W, 900lm, D150 unit Rp 205,000.00
41 Lampu DL RECESSED, SMART BRIGHT 9W, 600lm, D100 unit Rp 155,000.00
42 PABX 8 PTT 24 Extension (KX-TD Series) unit Rp 9,500,000.00
43 NVR, 8ch, 1HDD unit Rp 2,000,000.00
44 Wallmount Rack Switch Indorack 8U single Door unit Rp 2,050,000.00
45 Switch Hub 8 port unit Rp 1,750,000.00
46 Wireless MU-MIMO wave 2 Gigabit PoE + Access Point- 2,4 GHz / 5 GHz unit Rp 880,000.00
47 Busbar RSTN-GND lot Rp 250,000.00
48 Kabel, Wiring & Pemasangan lot Rp 450,000.00
49 Pipa Flexible m' Rp 6,000.00
50 Outlet Telepon, Wall Type Unit Rp 45,000.00
51 Led Monitor CCTV 32 inch, Unit Rp 2,500,000.00
52 witch Hub 8 Port Unit Rp 1,500,000.00
53 4 MP Fixed Dome AI network Camera Two-way Talk, AI-Powered, Support PoE,multiple user Unit Rp 1,070,000.00
54 IP Bullet Camera 4MP, H.265 IR, TDN 2.7MM-13.5MM, IP 66 Unit Rp 3,500,000.00
55 Pipa Pvc Aw Ø 3/4 " m' Rp 10,400.00
56 Pipa Pvc Aw Ø 1 " m' Rp 14,050.00
57 Pipa Pvc Aw Ø 1 1/2 " m' Rp 16,900.00
58 Pipa Pvc Aw Ø 2 " m' Rp 33,000.00
59 Pipa Pvc Aw Ø 3 " m' Rp 66,875.00
60 Pipa Pvc Aw Ø 4 " m' Rp 106,750.00
61 6,5" Ceilling speaker ,6/3/1,5W, White, Metal unit Rp 350,000.00
62 Exhaust Fan type ceilling unit Rp 450,000.00
63 Exhaust Fan type wallmounted unit Rp 650,000.00
64 Automatic switch bh Rp 150,000.00
65 Biofil BF 03 unit Rp 6,500,000.00
66 Floor drain unit Rp 350,000.00
67 Roof drain unit Rp 225,000.00
68 Wastafel unit Rp 950,000.00
69 Closet duduk unit Rp 2,500,000.00
70 Closet Jongkok unit Rp 750,000.00
71 Kran 1/2" sekualitas SAN-EI unit Rp 250,000.00
72 Stop Kran 1" unit Rp 150,000.00
73 Seal Tape unit Rp 5,500.00
74 Tangki air Total Drain TD 1.000 Liter (Inklude Instalasi) bh Rp 2,050,000.00
BACKUP VOLUME

Nama Proyek : KUA Jetis


Lokasi : Jl. Cokrokusuman Baru JT II No.786, Cokrodiningratan, Kec. Jetis, Kota Yogyakarta, Daerah Istimewa Yogyakarta 55233
Tahun Anggaran : 2023
Pemilik Proyek : Kemenag

JUMLAH PANJANG JUMLAH PANJANG


BERAT JUMLAH EKSTRA TULANGAN PANJANG PANJANG PANJANG PANJANG JARAK JUMLAH JUMLAH JUMLAH
DIAMETER PANJANG TINGGI LEBAR DIAMETER SAMBUNGAN SELIMUT TEKUKAN TEKUKAN TEKUKAN TEKUKAN
NO URAIAN PEKERJAAN VOLUME BESI LUAS POTONGAN DALAM FOOTPLAT / TULANGAN TULANGAN TULANGAN TULANGAN KELILING SENGKANG TULANGAN / TULANGAN / KOMPONEN SAT
BESI (L) (H) (B) (D) BESI BETON UJUNG 1 / UJUNG 1 / UJUNG 2 / UJUNG 2 /
PER M' BESI PILECAP ATAS 1 ATAS 2 BAWAH 1 BAWAH 2 / SPIRAL SENGKANG 1 SENGKANG 2 STRUKTUR
ATAS ATAS BAWAH BAWAH

1 2 3 4
II STRUKTUR
A PEKERJAAN TANAH
1 Galian
Footplat FP1 - 1250 x 1250 x 400 mm 54.76 1.85 2.00 1.85 8.00 m3
Footplat FP2 - 1000 x 1000 x 400 mm 10.24 1.60 2.00 1.60 2.00 m3
FP3 Footplat Tangga - 1000 x 1200 x 400 5.76 1.80 2.00 1.60 1.00 m3
Galian Siklop FP1 4.80 1.85 0.60 1.85 8.00 m3
Galian Siklop FP2 1.20 1.60 0.60 1.60 2.00 m3
Fondasi Batu Kali 32.39 50.61 0.80 0.80 1.00 m3
2 Urugan Tanah Kembali 58.39 m3
3 Urugan Pasir Struktur t: 10cm m3
Footplat FP1 - 1250 x 1250 x 400 mm 1.25 1.25 0.10 1.25 8.00 m3
Footplat FP2 - 1000 x 1000 x 400 mm 0.20 1.00 0.10 1.00 2.00 m3
FP3 Footplat Tangga - 1000 x 1200 x 400 0.12 1.20 0.10 1.00 1.00 m3
Fondasi Batu Kali 3.54 50.61 0.10 0.70 1.00 m3
Tie Beam TB1 - 250x400 1.11 44.40 0.10 0.25 1.00 m3
Tie Beam TB2 - 200x350 0.19 9.48 0.10 0.20 1.00 m3
4 Lantai Kerja Struktur t: 5cm
Footplat FP1 - 1250 x 1250 x 400 mm 0.63 1.25 0.05 1.25 8.00 m3
Footplat FP2 - 1000 x 1000 x 400 mm 0.10 1.00 0.05 1.00 2.00 m3
FP3 Footplat Tangga - 1000 x 1200 x 400 0.06 1.20 0.05 1.00 1.00 m3
Fondasi Batu Kali 1.77 50.61 0.05 0.70 1.00 m3
Tie Beam TB1 - 250x400 0.56 44.40 0.05 0.25 1.00 m3
Tie Beam TB2 - 200x350 0.09 9.48 0.05 0.20 1.00 m3

B PEKERJAAN STRUKTUR BAWAH

1 Footplat FP1 - 1250 x 1250 x 400 mm


Pembesian D13 Pokok Atas 233.33 13.00 1.04 1.25 0.40 1.25 0.05 1.15 1.15 2.00 0.30 0.15 8.00 8.00 8.00 kg
Pembesian D16 Pokok Bawah 354.67 16.00 1.58 1.25 0.40 1.25 0.05 1.15 1.15 2.00 0.30 0.15 8.00 8.00 8.00 kg
Bekisting 16.00 1.25 0.40 1.25 8.00 m2
Cor K-275 5.00 1.25 0.40 1.25 8.00 m3
Siklop Beton K250 60% - 40% Batu Belah 7.50 1.25 0.60 1.25 8.00 m3
2 Footplat FP2 - 1000 x 1000 x 400 mm
Pembesian D13 Pokok Atas 37.50 13.00 1.04 1.00 0.40 1.00 0.05 0.90 0.90 2.00 0.30 0.15 6.00 6.00 2.00 kg
Pembesian D13 Pokok Bawah 37.50 13.00 1.04 1.00 0.40 1.00 0.05 0.90 0.90 2.00 0.30 0.15 6.00 6.00 2.00 kg
Bekisting 3.20 1.00 0.40 1.00 2.00 m2
Cor K-275 0.80 1.00 0.40 1.00 2.00 m3
Siklop Beton K250 60% - 40% Batu Belah 1.20 1.00 0.60 1.00 2.00 m3
4 Footplat FP3 Tangga - 1000 x 1200 x 400
Pembesian D13 Pokok Atas 40.42 13.00 1.04 1.20 0.40 1.00 0.05 1.10 0.90 1.10 0.90 0.30 0.30 0.15 8.00 7.00 1.00 kg
Pembesian D13 Pokok Bawah 40.42 13.00 1.04 1.20 0.40 1.00 0.05 1.10 0.90 1.10 0.90 0.30 0.30 0.15 8.00 7.00 1.00 kg
Bekisting 1.92 1.20 0.40 1.00 1.00 m2
Cor K-275 0.48 1.20 0.40 1.00 1.00 m3
4 Tie Beam TB1 - 250x400
Pembesian D16 Pokok 618.64 16.00 1.58 44.40 0.40 0.25 0.00 0.00 8.00 kg
Overstek 16.21 16.00 1.58 1.00 0.64 8.00 2.00 kg
Hook 24.32 16.00 1.58 10.00 0.19 8.00 kg
Pembesian D13 Pinggang 101.75 13.00 1.04 44.40 0.40 0.25 0.00 0.00 2.00 kg
Overstek 2.17 13.00 1.04 1.00 0.52 2.00 2.00 kg
Hook 3.25 13.00 1.04 10.00 0.16 2.00 kg
BACKUP VOLUME

Nama Proyek : KUA Jetis


Lokasi : Jl. Cokrokusuman Baru JT II No.786, Cokrodiningratan, Kec. Jetis, Kota Yogyakarta, Daerah Istimewa Yogyakarta 55233
Tahun Anggaran : 2023
Pemilik Proyek : Kemenag

JUMLAH PANJANG JUMLAH PANJANG


BERAT JUMLAH EKSTRA TULANGAN PANJANG PANJANG PANJANG PANJANG JARAK JUMLAH JUMLAH JUMLAH
DIAMETER PANJANG TINGGI LEBAR DIAMETER SAMBUNGAN SELIMUT TEKUKAN TEKUKAN TEKUKAN TEKUKAN
NO URAIAN PEKERJAAN VOLUME BESI LUAS POTONGAN DALAM FOOTPLAT / TULANGAN TULANGAN TULANGAN TULANGAN KELILING SENGKANG TULANGAN / TULANGAN / KOMPONEN SAT
BESI (L) (H) (B) (D) BESI BETON UJUNG 1 / UJUNG 1 / UJUNG 2 / UJUNG 2 /
PER M' BESI PILECAP ATAS 1 ATAS 2 BAWAH 1 BAWAH 2 / SPIRAL SENGKANG 1 SENGKANG 2 STRUKTUR
ATAS ATAS BAWAH BAWAH

1 2 3 4
Pembesian D10 Sengkang 251.15 10.00 0.62 44.40 0.40 0.25 0.04 1.04 0.13 356.00 kg
Bekisting 39.07 44.40 0.40 0.25 m2
Cor K-275 4.66 44.40 0.40 0.25 m3
BACKUP VOLUME

Nama Proyek : KUA Jetis


Lokasi : Jl. Cokrokusuman Baru JT II No.786, Cokrodiningratan, Kec. Jetis, Kota Yogyakarta, Daerah Istimewa Yogyakarta 55233
Tahun Anggaran : 2023
Pemilik Proyek : Kemenag

JUMLAH PANJANG JUMLAH PANJANG


BERAT JUMLAH EKSTRA TULANGAN PANJANG PANJANG PANJANG PANJANG JARAK JUMLAH JUMLAH JUMLAH
DIAMETER PANJANG TINGGI LEBAR DIAMETER SAMBUNGAN SELIMUT TEKUKAN TEKUKAN TEKUKAN TEKUKAN
NO URAIAN PEKERJAAN VOLUME BESI LUAS POTONGAN DALAM FOOTPLAT / TULANGAN TULANGAN TULANGAN TULANGAN KELILING SENGKANG TULANGAN / TULANGAN / KOMPONEN SAT
BESI (L) (H) (B) (D) BESI BETON UJUNG 1 / UJUNG 1 / UJUNG 2 / UJUNG 2 /
PER M' BESI PILECAP ATAS 1 ATAS 2 BAWAH 1 BAWAH 2 / SPIRAL SENGKANG 1 SENGKANG 2 STRUKTUR
ATAS ATAS BAWAH BAWAH

1 2 3 4
5 Tie Beam TB2 - 200x350
Pembesian D13 Pokok 59.25 13.00 1.04 9.48 0.35 0.20 0.00 0.00 6.00 kg
Overstek 6.50 13.00 1.04 1.00 0.52 6.00 2.00 kg
Hook 9.75 13.00 1.04 10.00 0.16 6.00 kg
Pembesian D10 Pinggang 11.69 10.00 0.62 9.48 0.35 0.20 0.00 0.00 2.00 kg
Overstek 0.99 10.00 0.62 1.00 0.40 2.00 2.00 kg
Hook 1.48 10.00 0.62 10.00 0.12 2.00 kg
Pembesian D10 Sengkang 39.37 10.00 0.62 9.48 0.35 0.20 0.04 0.84 0.13 76.00 kg
Bekisting 6.64 9.48 0.35 0.20 m2
Cor K-275 0.66 9.48 0.35 0.20 m3
6 Sloof Praktis Sp 44.21 44.21 m1
7 Kolom Pedestal K1 - 400x450
Pembesian D16 Pokok 428.64 16.00 1.58 0.45 2.00 0.40 0.00 0.00 0.50 1.00 0.32 12.00 8.00 kg
Overstek 97.28 16.00 1.58 0.64 12.00 8.00 kg
Pembesian D10 Sengkang 142.08 10.00 0.62 0.45 2.00 0.40 0.04 0.50 1.44 0.13 20.00 8.00 kg
Bekisting 21.76 0.45 1.60 0.40 8.00 m2
Cor K-275 2.30 0.45 1.60 0.40 8.00 m3
8 Kolom Pedestal K2 - 200x600
Pembesian D16 Pokok 107.16 16.00 1.58 0.60 2.00 0.20 0.00 0.00 0.50 1.00 0.32 12.00 2.00 kg
Overstek 24.32 16.00 1.58 0.64 12.00 2.00 kg
Pembesian D10 Sengkang 33.05 10.00 0.62 0.60 2.00 0.20 0.04 0.50 1.34 0.13 20.00 2.00 kg
Bekisting 5.12 0.60 1.60 0.20 2.00 m2
Cor K-275 0.38 0.60 1.60 0.20 2.00 m3
9 Fondasi Batu Kali 20.24 50.61 0.40 m3

C PEKERJAAN STRUKTUR ATAS


a Lantai 1
1 Kolom K1 - 400x450
Pembesian D16 Pokok 664.24 16.00 1.58 0.45 3.55 0.40 0.00 0.00 0.50 1.00 0.32 12.00 8.00 kg
Overstek 97.28 16.00 1.58 0.64 12.00 8.00 kg
Pembesian D10 Sengkang 234.43 10.00 0.62 0.45 3.55 0.40 0.04 0.50 1.44 0.13 33.00 8.00 kg
Bekisting 48.28 0.45 3.55 0.40 8.00 m2
Cor K-275 5.11 0.45 3.55 0.40 8.00 m3
2 Kolom K2 - 200x600
Pembesian D16 Pokok 166.06 16.00 1.58 0.60 3.55 0.20 0.00 0.00 0.50 1.00 0.32 12.00 2.00 kg
Overstek 24.32 16.00 1.58 0.64 12.00 2.00 kg
Pembesian D10 Sengkang 54.54 10.00 0.62 0.60 3.55 0.20 0.04 0.50 1.34 0.13 33.00 2.00 kg
Bekisting 11.36 0.60 3.55 0.20 2.00 m2
Cor K-275 0.85 0.60 3.55 0.20 2.00 m3
3 Kolom K4 - 150x300
Pembesian D13 Pokok 71.50 12.00 1.04 0.30 3.55 0.15 0.00 0.00 0.50 1.00 0.24 8.00 2.00 kg
Overstek 8.00 12.00 1.04 0.48 8.00 2.00 kg
Pembesian D10 Sengkang 26.05 10.00 0.62 0.30 3.55 0.15 0.04 0.50 0.64 0.13 33.00 2.00 kg
Bekisting 6.39 0.30 3.55 0.15 2.00 m2
Cor K-275 0.32 0.30 3.55 0.15 2.00 m3
4 Kolom Praktis 71.00 3.55 20.00 m1
5 Angkur Kolom Praktis Besi P 8 28.05 8.00 0.40 0.40 3.55 0.40 20.00 kg
6 Balok B1 - 250x600 SFL +3.550
Pembesian D16 Pokok 443.33 16.00 1.58 28.00 0.60 0.25 0.00 0.00 10.00 kg
overstek 0.00 16.00 1.58 0.64 10.00 2.00 kg
hook 24.32 16.00 1.58 0.19 10.00 8.00 kg
BACKUP VOLUME

Nama Proyek : KUA Jetis


Lokasi : Jl. Cokrokusuman Baru JT II No.786, Cokrodiningratan, Kec. Jetis, Kota Yogyakarta, Daerah Istimewa Yogyakarta 55233
Tahun Anggaran : 2023
Pemilik Proyek : Kemenag

JUMLAH PANJANG JUMLAH PANJANG


BERAT JUMLAH EKSTRA TULANGAN PANJANG PANJANG PANJANG PANJANG JARAK JUMLAH JUMLAH JUMLAH
DIAMETER PANJANG TINGGI LEBAR DIAMETER SAMBUNGAN SELIMUT TEKUKAN TEKUKAN TEKUKAN TEKUKAN
NO URAIAN PEKERJAAN VOLUME BESI LUAS POTONGAN DALAM FOOTPLAT / TULANGAN TULANGAN TULANGAN TULANGAN KELILING SENGKANG TULANGAN / TULANGAN / KOMPONEN SAT
BESI (L) (H) (B) (D) BESI BETON UJUNG 1 / UJUNG 1 / UJUNG 2 / UJUNG 2 /
PER M' BESI PILECAP ATAS 1 ATAS 2 BAWAH 1 BAWAH 2 / SPIRAL SENGKANG 1 SENGKANG 2 STRUKTUR
ATAS ATAS BAWAH BAWAH

1 2 3 4
Pembesian D13 Pinggang 116.67 13.00 1.04 28.00 0.60 0.25 0.00 0.00 4.00 kg
overstek 0.00 13.00 1.04 0.52 4.00 2.00 kg
hook 5.20 13.00 1.04 0.16 4.00 8.00 kg
Pembesian D10 Sengkang 198.91 10.00 0.62 28.00 0.60 0.25 0.04 1.44 0.13 224.00 kg
Bekisting 40.60 28.00 0.60 0.25 m2
Cor K-275 4.20 28.00 0.60 0.25 m3
7 Balok B2 - 200x450 SFL +3.550
Pembesian D13 Pokok 296.67 13.00 1.04 35.60 0.45 0.20 0.00 0.00 8.00 kg
overstek 25.71 13.00 1.04 2.97 0.52 8.00 2.00 kg
hook 0.00 13.00 1.04 0.16 8.00 0.00 kg
Pembesian D10 Pinggang 43.91 10.00 0.62 35.60 0.45 0.20 0.00 0.00 2.00 kg
overstek 2.93 10.00 0.62 2.97 0.40 2.00 2.00 kg
hook 0.00 10.00 0.62 0.12 2.00 0.00 kg
Pembesian D10 Sengkang 182.78 10.00 0.62 35.60 0.45 0.20 0.04 1.04 0.13 285.00 kg
Bekisting 39.16 35.60 0.45 0.20 m2
Cor K-275 3.20 35.60 0.45 0.20 m3
8 Balok B3 - 200x350 SFL +3.550
Pembesian D13 Pokok 129.17 13.00 1.04 15.50 0.35 0.20 0.00 0.00 8.00 kg
overstek 0.00 13.00 1.04 0.52 8.00 2.00 kg
hook 5.20 13.00 1.04 0.16 8.00 4.00 kg
Pembesian D10 Pinggang 19.12 10.00 0.62 15.50 0.35 0.20 0.00 0.00 2.00 kg
overstek 0.00 10.00 0.62 0.40 2.00 2.00 kg
hook 0.59 10.00 0.62 0.12 2.00 4.00 kg
Pembesian D10 Sengkang 64.23 10.00 0.62 15.50 0.35 0.20 0.04 0.84 0.13 124.00 kg
Bekisting 13.95 15.50 0.35 0.20 m2
Cor K-275 1.09 15.50 0.35 0.20 m3
9 Balok B4 - 200x300 SFL +3.550
Pembesian D13 Pokok 260.42 13.00 1.04 31.25 0.30 0.20 0.00 0.00 8.00 kg
overstek 0.00 13.00 1.04 0.52 8.00 2.00 kg
hook 18.20 13.00 1.04 0.16 8.00 14.00 kg
Pembesian D10 Pinggang 38.54 10.00 0.62 31.25 0.30 0.20 0.00 0.00 2.00 kg
overstek 0.00 10.00 0.62 0.40 2.00 2.00 kg
hook 2.07 10.00 0.62 0.12 2.00 14.00 kg
Pembesian D10 Sengkang 114.08 10.00 0.62 31.25 0.30 0.20 0.04 0.74 0.13 250.00 kg
Bekisting 25.00 31.25 0.30 0.20 m2
Cor K-275 1.88 31.25 0.30 0.20 m3
BACKUP VOLUME

Nama Proyek : KUA Jetis


Lokasi : Jl. Cokrokusuman Baru JT II No.786, Cokrodiningratan, Kec. Jetis, Kota Yogyakarta, Daerah Istimewa Yogyakarta 55233
Tahun Anggaran : 2023
Pemilik Proyek : Kemenag

JUMLAH PANJANG JUMLAH PANJANG


BERAT JUMLAH EKSTRA TULANGAN PANJANG PANJANG PANJANG PANJANG JARAK JUMLAH JUMLAH JUMLAH
DIAMETER PANJANG TINGGI LEBAR DIAMETER SAMBUNGAN SELIMUT TEKUKAN TEKUKAN TEKUKAN TEKUKAN
NO URAIAN PEKERJAAN VOLUME BESI LUAS POTONGAN DALAM FOOTPLAT / TULANGAN TULANGAN TULANGAN TULANGAN KELILING SENGKANG TULANGAN / TULANGAN / KOMPONEN SAT
BESI (L) (H) (B) (D) BESI BETON UJUNG 1 / UJUNG 1 / UJUNG 2 / UJUNG 2 /
PER M' BESI PILECAP ATAS 1 ATAS 2 BAWAH 1 BAWAH 2 / SPIRAL SENGKANG 1 SENGKANG 2 STRUKTUR
ATAS ATAS BAWAH BAWAH

1 2 3 4
10 Balok B5 - 200x250 SFL +3.550
Pembesian D13 Pokok 41.25 13.00 1.04 6.60 0.25 0.20 0.00 0.00 6.00 kg
overstek 0.00 13.00 1.04 0.52 6.00 2.00 kg
hook 12.68 13.00 1.04 0.16 6.00 13.00 kg
Pembesian D10 Sengkang 20.92 10.00 0.62 6.60 0.25 0.20 0.04 0.64 0.13 53.00 kg
Bekisting 4.62 6.60 0.25 0.20 m2
Cor K-275 0.33 6.60 0.25 0.20 m3
11 Balok BT - 150x300 Bordes
Pembesian P12 Pokok 8.26 12.00 0.89 1.55 0.30 0.15 0.00 0.00 6.00 kg
overstek 0.00 12.00 0.89 0.48 6.00 2.00 kg
hook 3.07 12.00 0.89 0.14 6.00 4.00 kg
Pembesian D10 Pinggang 1.91 10.00 0.62 1.55 0.30 0.15 0.00 0.00 2.00 kg
overstek 0.00 10.00 0.62 0.40 2.00 2.00 kg
hook 0.59 10.00 0.62 0.12 2.00 4.00 kg
Pembesian D10 Sengkang 5.13 10.00 0.62 1.55 0.30 0.15 0.04 0.64 0.13 13.00 kg
Bekisting 1.16 1.55 0.30 0.15 m2
Cor K-275 0.07 1.55 0.30 0.15 m3
12 Balok Lateu 150x150 36.07 36.07 m1
13 Plat Lantai PL1, t:12cm SFL +3.550
Pembesian D10 Pokok 1471.30 10.00 0.62 99.41 1.00 1.00 6.00 6.00 2.00 kg
overstek 23.02 10.00 0.62 7.00 0.40 0.15 46.67 2.00 kg
Bekisting 99.41 99.41 m2
Cor K-275 11.93 0.12 99.41 m3
14 Plat Atap Canopy PL2, t:10cm SFL +3.550
Pembesian D8 Pokok 104.28 8.00 0.40 11.00 1.00 1.00 6.00 6.00 2.00 kg
overstek 11.80 8.00 0.40 7.00 0.32 0.15 46.67 2.00 kg
Bekisting 11.00 11.00 m2
Cor K-275 1.10 0.10 11.00 m3
15 Plat Topi-topi PL3, t:10cm
Pembesian D8 Pokok 74.28 10.00 0.40 15.67 1.00 1.00 6.00 6.00 1.00 kg
Bekisting 15.67 15.67 m2
Cor K-175 1.25 0.08 15.67 m3
16 Plat Bordes, t:15cm
Pembesian D10 Pokok 28.42 10.00 0.62 1.44 1.00 1.00 8.00 8.00 2.00 kg
Bekisting 1.44 1.44 m2
Cor K-275 0.22 0.15 1.44 m3
17 Tangga, t:15cm
Pembesian D10 Pokok 326.78 10.00 0.62 16.56 1.00 1.00 8.00 8.00 2.00 kg
Pembesian P12 Pokok 76.77 12.00 0.89 10.81 1.20 12.97 0.15 kg
Bekisting 12.97 12.97 m2
Cor K-275 1.95 0.15 12.97 m3

b Lantai 2
1 Kolom K2 - 200x600
Pembesian D16 Pokok 166.06 16.00 1.58 0.60 3.55 0.20 0.00 0.00 0.50 1.00 0.32 12.00 2.00 kg
hook 7.27 16.00 1.58 0.19 12.00 2.00 kg
Pembesian D10 Sengkang 54.54 10.00 0.62 0.60 3.55 0.20 0.04 0.50 1.34 0.13 33.00 2.00 kg
Bekisting 11.36 0.60 3.55 0.20 2.00 m2
Cor K-275 0.85 0.60 3.55 0.20 2.00 m3
2 Kolom K3 - 150x400
Pembesian D13 Pokok 287.33 13.00 1.04 0.40 3.55 0.15 0.00 0.00 0.50 1.00 0.26 8.00 8.00 kg
BACKUP VOLUME

Nama Proyek : KUA Jetis


Lokasi : Jl. Cokrokusuman Baru JT II No.786, Cokrodiningratan, Kec. Jetis, Kota Yogyakarta, Daerah Istimewa Yogyakarta 55233
Tahun Anggaran : 2023
Pemilik Proyek : Kemenag

JUMLAH PANJANG JUMLAH PANJANG


BERAT JUMLAH EKSTRA TULANGAN PANJANG PANJANG PANJANG PANJANG JARAK JUMLAH JUMLAH JUMLAH
DIAMETER PANJANG TINGGI LEBAR DIAMETER SAMBUNGAN SELIMUT TEKUKAN TEKUKAN TEKUKAN TEKUKAN
NO URAIAN PEKERJAAN VOLUME BESI LUAS POTONGAN DALAM FOOTPLAT / TULANGAN TULANGAN TULANGAN TULANGAN KELILING SENGKANG TULANGAN / TULANGAN / KOMPONEN SAT
BESI (L) (H) (B) (D) BESI BETON UJUNG 1 / UJUNG 1 / UJUNG 2 / UJUNG 2 /
PER M' BESI PILECAP ATAS 1 ATAS 2 BAWAH 1 BAWAH 2 / SPIRAL SENGKANG 1 SENGKANG 2 STRUKTUR
ATAS ATAS BAWAH BAWAH

1 2 3 4
hook 10.40 13.00 1.04 0.16 8.00 8.00 kg
Pembesian D10 Sengkang 136.75 10.00 0.62 0.40 3.55 0.15 0.04 0.50 0.84 0.13 33.00 8.00 kg
Bekisting 31.24 0.40 3.55 0.15 8.00 m2
Cor K-275 1.70 0.40 3.55 0.15 8.00 m3
3 Kolom Praktis 71.05 3.55 19.00 m1
Kolom Praktis Fasade 8.76 2.58 2.00 m1
4 Angkur Kolom Praktis Besi P 8 26.64 8.00 0.40 0.40 3.55 0.40 19.00 kg
5 Balok Ringbalk (RB) 150x200 SFL +7.700 37.00 37.00 m1
6 Balok Lateu 150x150 43.32 43.32 m1
7 Balok B2 - 200x450 SFL +7.200
Pembesian D13 Pokok 43.33 13.00 1.04 5.20 0.45 0.20 0.00 0.00 8.00 kg
overstek 0.00 13.00 1.04 0.52 8.00 2.00 kg
hook 10.40 13.00 1.04 0.16 8.00 8.00 kg
Pembesian D10 Pinggang 6.41 10.00 0.62 5.20 0.45 0.20 0.00 0.00 2.00 kg
overstek 0.00 10.00 0.62 0.40 2.00 2.00 kg
hook 1.18 10.00 0.62 0.12 2.00 8.00 kg
Pembesian D10 Sengkang 26.94 10.00 0.62 5.20 0.45 0.20 0.04 1.04 0.13 42.00 kg
Bekisting 5.72 5.20 0.45 0.20 m2
Cor K-275 0.47 5.20 0.45 0.20 m3
8 Balok B6 - 150x300 Miring SFL +7.150 s/d +9.950
Pembesian D13 Pokok 107.50 13.00 1.04 17.20 0.30 0.15 0.00 0.00 6.00 kg
overstek 13.00 13.00 1.04 2.00 0.52 6.00 2.00 kg
hook 7.80 13.00 1.04 0.16 6.00 8.00 kg
Pembesian D10 Pinggang 21.21 10.00 0.62 17.20 0.30 0.15 0.00 0.00 2.00 kg
overstek 1.97 10.00 0.62 2.00 0.40 2.00 2.00 kg
hook 1.18 10.00 0.62 0.12 2.00 8.00 kg
Pembesian D10 Sengkang 54.46 10.00 0.62 17.20 0.30 0.15 0.04 0.64 0.13 138.00 kg
Bekisting 12.90 17.20 0.30 0.15 m2
Cor K-275 0.77 17.20 0.30 0.15 m3
9 Balok B4 - 200x300 SFL +7.200
Pembesian D13 Pokok 35.67 13.00 1.04 4.28 0.30 0.20 0.00 0.00 8.00 kg
overstek 0.00 13.00 1.04 0.52 8.00 2.00 kg
hook 10.40 13.00 1.04 0.16 8.00 8.00 kg
Pembesian D10 Pinggang 5.28 10.00 0.62 4.28 0.30 0.20 0.00 0.00 2.00 kg
overstek 0.00 10.00 0.62 0.40 2.00 2.00 kg
hook 1.18 10.00 0.62 0.12 2.00 8.00 kg
Pembesian D10 Sengkang 15.97 10.00 0.62 4.28 0.30 0.20 0.04 0.74 0.13 35.00 kg
Bekisting 3.42 4.28 0.30 0.20 m2
Cor K-275 0.26 4.28 0.30 0.20 m3
10 Balok B6 - 150x300 SFL +9.950
Pembesian D13 Pokok 13.38 13.00 1.04 2.14 0.30 0.15 0.00 0.00 6.00 kg
overstek 13.00 13.00 1.04 2.00 0.52 6.00 2.00 kg
hook 7.80 13.00 1.04 0.16 6.00 8.00 kg
Pembesian D10 Pinggang 2.64 10.00 0.62 2.14 0.30 0.15 0.00 0.00 2.00 kg
overstek 1.97 10.00 0.62 2.00 0.40 2.00 2.00 kg
hook 1.18 10.00 0.62 0.12 2.00 8.00 kg
Pembesian D10 Sengkang 7.10 10.00 0.62 2.14 0.30 0.15 0.04 0.64 0.13 18.00 kg
Bekisting 1.61 2.14 0.30 0.15 m2
Cor K-275 0.10 2.14 0.30 0.15 m3
11 Balok B6 - 150x300 SFL +7.200
Pembesian D13 Pokok 322.19 13.00 1.04 51.55 0.30 0.15 0.00 0.00 6.00 kg
BACKUP VOLUME

Nama Proyek : KUA Jetis


Lokasi : Jl. Cokrokusuman Baru JT II No.786, Cokrodiningratan, Kec. Jetis, Kota Yogyakarta, Daerah Istimewa Yogyakarta 55233
Tahun Anggaran : 2023
Pemilik Proyek : Kemenag

JUMLAH PANJANG JUMLAH PANJANG


BERAT JUMLAH EKSTRA TULANGAN PANJANG PANJANG PANJANG PANJANG JARAK JUMLAH JUMLAH JUMLAH
DIAMETER PANJANG TINGGI LEBAR DIAMETER SAMBUNGAN SELIMUT TEKUKAN TEKUKAN TEKUKAN TEKUKAN
NO URAIAN PEKERJAAN VOLUME BESI LUAS POTONGAN DALAM FOOTPLAT / TULANGAN TULANGAN TULANGAN TULANGAN KELILING SENGKANG TULANGAN / TULANGAN / KOMPONEN SAT
BESI (L) (H) (B) (D) BESI BETON UJUNG 1 / UJUNG 1 / UJUNG 2 / UJUNG 2 /
PER M' BESI PILECAP ATAS 1 ATAS 2 BAWAH 1 BAWAH 2 / SPIRAL SENGKANG 1 SENGKANG 2 STRUKTUR
ATAS ATAS BAWAH BAWAH

1 2 3 4
overstek 13.00 13.00 1.04 2.00 0.52 6.00 2.00 kg
hook 7.80 13.00 1.04 0.16 6.00 8.00 kg
Pembesian D10 Pinggang 63.58 10.00 0.62 51.55 0.30 0.15 0.00 0.00 2.00 kg
overstek 1.97 10.00 0.62 2.00 0.40 2.00 2.00 kg
hook 1.18 10.00 0.62 0.12 2.00 8.00 kg
Pembesian D10 Sengkang 163.00 10.00 0.62 51.55 0.30 0.15 0.04 0.64 0.13 413.00 kg
Bekisting 38.66 51.55 0.30 0.15 m2
Cor K-275 2.32 51.55 0.30 0.15 m3
12 Balok B7 - 150x200 SFL +7.200
Pembesian P10 Pokok 196.22 10.00 0.62 79.12 0.30 0.15 0.00 0.00 4.00 kg
hook 2.37 10.00 0.62 0.12 4.00 8.00 kg
Pembesian P8 Sengkang 160.02 10.00 0.40 79.12 0.30 0.15 0.04 0.64 0.13 633.00 kg
Bekisting 59.34 79.12 0.30 0.15 m2
Cor K-275 3.56 79.12 0.30 0.15 m3
13 Plat Talang Beton & Tandon Air PL3, t:10cm SFL +7.200
Pembesian D8 Pokok 272.27 10.00 0.40 57.44 1.00 1.00 6.00 6.00 1.00 kg
overstek 14.75 10.00 0.40 7.00 0.40 0.15 46.67 2.00 kg
Bekisting 57.44 57.44 m2
Cor K-275 4.60 0.08 57.44 m3
14 Plat Miring PL2, t:10cm SFL +7.150 s/d +9.950
Pembesian D8 Pokok 176.09 8.00 0.40 18.58 1.00 1.00 6.00 6.00 2.00 kg
overstek 14.75 10.00 0.40 7.00 0.40 0.15 46.67 2.00 kg
Bekisting 18.58 18.58 m2
Cor K-275 1.86 0.10 18.58 m3
15 Plat Topi-topi PL3, t:10cm
Pembesian D8 Pokok 27.78 10.00 0.40 5.86 1.00 1.00 6.00 6.00 1.00 kg
Bekisting 5.86 5.86 m2
Cor K-175 0.47 0.08 5.86 m3
AREA PANJANG LEBAR TINGGI THICK DEEP WEIGHT AREA VOLUME LENGTH WEIGHT
NO WORK ITEMS Frame NUMBER
m2 m' m' m' m' m' kg m2 m3 m' kg
PEKERJAAN ARSITEKTUR
I PEKERJAAN TANAH DAN PASIR
1 Urug Pasir Bawah Lantai, Tebal 5 cm 7.63
Area Bangunan + Selasar 152.59 0.05 7.63

2 Peninggian Elevasi dengan Urugan Tanah Mendatangkan 16.71


kebutuhan 152.59 0.4 61.04
(sisa urugan tanah kembali) -44.33

II PEKERJAAN PASANGAN
1 Pasangan Dinding Bata Ringan
LANTAI 1 188.51
Horizontal
Grid C 14 3.2 44.80
9.69 3.2 31.01
Grid B 14 3.2 44.80
Vertikal
Grid 1 6.55 3.2 20.96
5.49 3.2 17.57
1.6 3.2 5.12
Grid 2 3.2 3.2 10.24
7.15 3.2 22.88
Grid 4 7.15 3.2 22.88
Pengurangan Pintu & Jendela
P1 2 2.3 1.00 (4.60)
P2 1.37 2.6 1.00 (3.56)
P3 0.9 2.6 4.00 (9.36)
P4 0.9 2.19 1.00 (1.97)
P5 0.75 2.2 2.00 (3.30)
P6 0.55 1 1.00 (0.55)
J1 1.24 1.5 3.00 (5.58)
J2 0.64 1.5 2.00 (1.92)
BV 0.64 0.45 3.00 (0.86)
Roster 0.2 0.2 1.00 (0.04)

LANTAI 2 206.16
Horizontal
Grid C 14 3.2 44.80
10.02 3.2 32.06
Grid B 14 3.2 44.80
Vertikal
Grid 1 7.15 3.2 22.88
Grid 2 7.9 3.2 25.28
Grid 3 3.1 3.2 9.92
Grid 4 7.15 3.2 22.88
Fasade 22 22.00
Pengurangan Pintu & Jendela
P3 0.9 2.6 2.00 (4.68)
P5 0.75 2.2 2.00 (3.30)
P6 0.55 1 1.00 (0.55)
J1 1.24 1.5 11.00 (20.46)
BV 0.64 0.45 2.00 (0.58)
Pas. Bata tanggul dak beton atap 37.02 0.3 11.11

2 Pekerjaan Plesteran Mortar Siap Pakai


LANTAI 1 512.12
Luasan pasangan dinding bata 188.51 188.51
Kolom 6.12 1.7 3.6 8.00 48.96
5.76 1.6 3.6 2.00 11.52
Balok Luar 13.1 0.6 7.86
34.2 0.45 15.39
3.64 0.3 1.09
skoningan -172.73 0.1 (17.27)

LANTAI 2 497.41
Luasan pasangan dinding bata 206.16 206.16
Kolom 6.12 1.7 3.6 8.00 48.96
5.76 1.6 3.6 2.00 11.52
skoningan -179.38 0.1 (17.94)

3 Pekerjaan Acian Mortar Siap Pakai


LANTAI 1 526.74
Luasan plesteran dinding bata 546.66 546.66
kurangi dinding granit kamar mandi 11.72 1.7 (19.92)

LANTAI 2 516.93
Luasan plesteran dinding bata 533.29 533.29
kurangi dinding granit kamar mandi 9.62 1.7 (16.35)

4 Pekerjaan Skoning Mortar Siap Pakai


LANTAI 1 172.73
Openingan sisi
P1 6.65 1.00 1 6.65
P2 6.57 1.00 2 13.14
P3 6.1 4.00 2 48.8
P4 5.28 1.00 2 10.56
P5 5.15 2.00 2 20.6
P6 2.55 1.00 2 5.1
J1 5.48 3.00 2 32.88
J2 4.28 2.00 2 17.12
BV 2.18 3.00 2 13.08
Roster 0.8 3.00 2 4.8

LANTAI 2 179.38
Openingan sisi
P3 6.1 2.00 2 24.4
P5 5.15 2.00 2 20.6
P6 2.55 1.00 2 5.1
J1 5.48 11.00 2 120.56
BV 2.18 2.00 2 8.72

5 Pasang Dinding Partisi Gypsum 2 sisi + Rangka Kayu dan Finishing Cat, PT 1 4.50
1.5 1.5 2.00 4.50

6 Pasang Dinding Partisi Gypsum 2 sisi + Rangka Kayu dan Finishing Cat, PT 2 6.00
2 1.5 2.00 6.00

7 Pasang Dinding Partisi Gypsum 2 sisi + Rangka Kayu dan Finishing Cat, PT 3 11.01
3.67 1.5 2.00 11.01

8 Pasang Dinding Partisi Gypsum 2 sisi + Rangka Kayu dan Finishing Cat, PT 4 17.10
2.85 1.5 4.00 17.10

9 Pasang Dinding Partisi Gypsum 2 sisi + Rangka Kayu dan Finishing Cat, PT 5 15.27
5.09 1.5 2.00 15.27

10 Pasang Kaca Es PT1, tebal 5 mm (Lengkap Dengan Perkuatan dan aksesoris) 0.45
1.5 0.3 0.45

11 Pasang Kaca Es PT2, tebal 5 mm (Lengkap Dengan Perkuatan dan aksesoris) 0.60
2 0.3 0.60

12 Pasang Kaca Es PT3, tebal 5 mm (Lengkap Dengan Perkuatan dan aksesoris) 0.86
2.88 0.3 0.86

13 Pasang Kaca Es PT4, tebal 5 mm (Lengkap Dengan Perkuatan dan aksesoris) 0.86
2.85 0.3 0.86
14 Pasang Kaca Es PT5, tebal 5 mm (Lengkap Dengan Perkuatan dan aksesoris) 1.29
4.3 0.3 1.29

15 Pasang Roster Beton + Finishing Cat 0.2 0.2 3.00 0.12


III PEKERJAAN LANTAI
1 Rabat Beton Bawah Lantai K-200, Tebal 8cm 4.46
R. Balai nikah & Manasik Haji 6.97 7.15 0.08 3.99
R. PTSP 2.92 1.7 0.08 0.40
0.9 1.05 0.08 0.08

2 Rabat Beton Ramp Difabel K-175, Tebal 8cm 0.77


2.16 1.05 0.08 0.18
2.7 1.25 0.08 0.27
2.3 1.75 0.08 0.32

3 Pekerjaan Lantai Vinyl Lt.1


- Pekerjaan Acian 55.74
R. Balai Nikah Penyuluhan dan Manasik Haji 6.97 7.15 49.84
R. PTSP 2.92 1.7 4.96
0.9 1.05 0.95

- Pasang Lantai Vinyl uk. 15cm x 80cm t ; 5mm 55.74


R. Balai Nikah Penyuluhan dan Manasik Haji 6.97 7.15 49.84
R. PTSP 2.92 1.7 4.96
0.9 1.05 0.95

4 Pasang Lantai Keramik 60cm x 60cm Polished


Lantai 1 10.08
R. Konsultasi 2.88 2.72 7.83
R. Laktasi 1.18 1.9 2.24
Lantai 2 94.20
R. Kepala KUA 3.85 3.1 11.94
R. Arsip 2.97 3.1 9.21
R. Kerja 15.3 2.73 41.77
Selasar 13.97 1.18 16.48
6.85 1.5 10.27
3.65 0.37 1.35
2.3 1.38 3.17

5 Pasang Lantai Homogenous Tile Tangga 60cm x 60cm Unpolished


LANTAI 1 22.82
Selasar Depan 11.8 1.25 14.75
10.55 0.46 4.85
4.95 0.65 3.22

6 Pasang Lantai Homogenous Tile Tangga 60cm x 60cm Unpolished


Lantai 1 sampai lantai 2 13.38
antrade (datar) 1.2 0.3 17.00 6.12
optrade (berdiri) 1.2 0.18 20.00 4.32
Bordes 1.2 1.2 1.44
1.25 1.2 1.50

7 Pasang Lantai Keramik Tile 40cm x 40cm Anti selip, Kamar Mandi
Lantai 1 5.52
Toilet 1 2.1 1.6 3.36
Toilet 2 1.35 1.6 2.16
Lantai 2 3.84
Toilet 1 1.05 1.6 1.68
Toilet 2 1.35 1.6 2.16

8 Pasang Keramik Dinding 20cm x 40cm Polished, Kamar Mandi


Lantai 1 19.92
Toilet 1 6.61 1.7 11.24
Toilet 2 5.11 1.7 8.69
Lantai 2 16.35
Toilet 1 4.51 1.7 7.67
Toilet 2 5.11 1.7 8.69

9 Pasang Plint Keramik 10cm x 60cm


Lantai 2 53.18
R. Kepala 12.32
R. Kerja dan Selasar 40.86

10 Pasang Listello keramik 10cm x 20 cm, kamar Mandi


Lantai 1 11.72
Toilet 1 6.61
Toilet 2 5.11
Lantai 2 9.62
Toilet 1 4.51
Toilet 2 5.11

11 Pasang Stepnoshing Tangga Sampai Lt 2


Lt.1 - Lt.2 1.2 20.00 24.00

IV PEKERJAAN PINTU JENDELA


Lantai 1
1 Pasang P1 Pintu Utama (Lengkap dengan aksesoris, handle, dll) 1.00
2 Pasang P2 Pintu Ruang Balai Nikah & Manasik Haji (Lengkap dengan aksesoris, handle, dll) 1.00
3 Pasang P3 Pintu Ruangan (Lengkap dengan aksesoris, handle, dll) 4.00
4 Pasang P4 Pintu Ruang Laktasi (Lengkap dengan aksesoris, handle, dll) 1.00
5 Pasang P5 Pintu Kamar Mandi (Lengkap dengan aksesoris, handle, dll) 2.00
6 Pasang P6 Pintu Shaft (Lengkap dengan aksesoris, handle, dll) 1.00
7 Pasang J1 (Lengkap dengan aksesoris, handle, dll) 3.00
8 Pasang J2 (Lengkap dengan aksesoris, handle, dll) 2.00
9 Pasang BV (Lengkap dengan aksesoris, handle, dll) 3.00

Lantai 2
1 Pasang P3 Pintu Ruangan (Lengkap dengan aksesoris, handle, dll) 2.00
2 Pasang P5 Pintu Kamar Mandi (Lengkap dengan aksesoris, handle, dll) 2.00
3 Pasang P6 Pintu Shaft (Lengkap dengan aksesoris, handle, dll) 1.00
4 Pasang J1 (Lengkap dengan aksesoris, handle, dll) 11.00
5 Pasang BV (Lengkap dengan aksesoris, handle, dll) 2.00

V PEKERJAAN PLAFOND
Lantai 1
1 Pasang Plafond PVC + Rangka Hollow 105.42
R. balai nikah flat 4.96 5.12 25.40
7.15 1 2.00 14.30
5 1 2.00 10.00
R. Konsultasi 2.89 2.72 7.86
Toilet 1 2.1 1.6 3.36
Toilet 2 1.35 1.6 2.16
R. PTSP Flat 4.05 0.96 3.89
2.6 2.92 7.59
4.25 0.58 2.47
4.21 0.98 4.13
4.05 3.82 15.47
Selasar luar 5 1.76 8.80

Lantai 2 105.65
R. Kepala 3.85 3.1 11.94
R. Arsip 2.97 3.11 9.24
Toilet 1 1.05 1.6 1.68
Toilet 2 1.35 1.6 2.16
R. Kerja & Selasar 15.3 2.72 41.62
7.12 1.18 8.40
3.2 2.68 8.58
4.28 1.18 5.05
3.8 1.23 4.67
3.85 3.2 12.32
2 Pasang Upceiling Plafond PVC + Rangka Hollow
Lantai 1 30.18
R. Balai nikah 20.16
R. PTSP Flat 10.02

3 Pasang List Tepi Plafond PVC


Lantai 1 73.51
R. Balai Nikah & manasik haji 20.99
R. Konsultasi 11.22
toilet 1 7.4
toilet 2 5.9
R. PTSP 28
Lantai 2 90.83
R. Kepala 13.9
R. Arsip 12.16
Toilet 1 5.3
Toilet 2 5.9
R. Kerja 53.57

4 Plafond GRC Tritisan + Rangka Hollow 35.73


15.15 0.88 2.00 26.66
5.15 0.88 2.00 9.06

VI PEKERJAAN PENGECATAN
1 Cat Dinding Interior
Lantai 1 250.21
R. Konsultasi 11.2 3.45 38.64
R. Laktasi 6.12 3.45 21.11
R. Balai Nikah & Manasik Haji 28.24 3.45 97.43
Toilet 1 7.4 3.45 25.53
Toilet 2 5.9 3.45 20.36
R. PTSP 37.18 3.45 128.27
Pengurangan Pintu & Jendela
P1 2 2.3 1.00 (4.60)
P2 1.37 2.6 1.00 (3.56)
P3 0.9 2.6 4.00 (9.36)
P4 0.9 2.19 1.00 (1.97)
P5 0.75 2.2 2.00 (3.30)
P6 0.55 1 1.00 (0.55)
J1 1.24 1.5 3.00 (5.58)
J2 0.64 1.5 2.00 (1.92)
BV 0.64 0.45 3.00 (0.86)
Backdrop PTSP 2.85 3 (8.55)
Backdrop Balai Nikah 6.97 3 (20.91)
Tinggi keramik toilet 1 6.61 1.7 (11.24)
Tinggi keramik toilet 2 5.11 1.7 (8.69)
Roster 0.2 0.2 (0.04)

Lantai 2 219.99
R. Kepala 13.9 3.4 47.26
R. Arsip 12.14 3.4 41.28
Toilet 1 5.3 3.4 18.02
Toilet 2 5.9 3.4 20.06
R. Kerja 40.97 3.4 139.30
Pengurangan Pintu & Jendela
P3 0.9 2.6 2.00 (4.68)
P5 0.75 2.2 2.00 (3.30)
P6 0.55 1 1.00 (0.55)
J1 1.24 1.5 11.00 (20.46)
BV 0.64 0.45 2.00 (0.58)
Tinggi keramik toilet 1 4.51 1.7 (7.67)
Tinggi keramik toilet 2 5.11 1.7 (8.69)

2 Cat Dinding Exterior Type "Weathershield"


Lantai 1 166.53
Area Luar + kolom & Balok 46.1 4 184.40
Topi-Topi 0.72 0.4 6.00 1.73
0.4 0.08 6.00 0.19
0.72 0.08 3.00 0.17
0.59 0.08 2.00 0.09
4.17 0.08 0.33
4.17 0.59 2.46
Pengurangan Pintu & Jendela
P1 2 2.3 1.00 (4.60)
P2 1.37 2.6 1.00 (3.56)
P3 0.9 2.6 2.00 (4.68)
P5 0.75 2.2 1.00 (1.65)
J1 1.24 1.5 3.00 (5.58)
J2 0.64 1.5 2.00 (1.92)
BV 0.64 0.45 3.00 (0.86)

Lantai 2 176.02
Area Luar + kolom & Balok 46.1 3.5 161.35
Topi-Topi 0.72 0.4 8.00 2.30
0.72 0.08 2.00 0.12
0.4 0.08 8.00 0.26
1.32 0.4 18.00 9.50
Fasade 22 22.00
Pengurangan Pintu & Jendela 1.32 0.08 9.00 0.95
0.4 0.08 18.00 0.58
J1 1.24 1.5 11.00 (20.46)
BV 0.64 0.45 2.00 (0.58)
3 Cat Listplank
Atap Utama 6.63
15.15 0.3 4.55
6.95 0.3 2.09

4 Waterproofing Lantai Kamar Mandi


Lantai 2 3.84
Toilet 1 1.05 1.6 1.68
Toilet 2 1.35 1.6 2.16

5 Waterproofing Dak Canopy dan Talang Beton 59.64


15.99 1.3 2.00 41.57
6.95 1.3 2.00 18.07

6 Cat Coumpound Bawah Tangga (Ruang Laktasi) 2.24


1.9 1.18 2.24

VII PEKERJAAN ATAP


1 Pasang Rangka Atap Baja Ringan
Atap Utama 117.87
Panjang atas 8.2 90.83
Panjang bawah 15.15
panjang kemiringan 3.89

datar samping 6.95 27.04


panjang kemiringan 3.89

2 Pasang Penutup Genteng Utama genteng beton


Luasan Atap 117.87 117.87

3 Pasang Bubungan Genteng Beton


Atap Utama 23.76
8.2 8.2
3.89 4.00 15.56

4 Pasang Listplank
Atap Utama 44.20
15.15 2.00 30.3
6.95 2.00 13.9

PEKERJAAN LAIN-LAIN
I PEKERJAAN FASAD
1 Pasang Granit Dinding Motif Marmer 60cm x 60cm Polished, Ornamen P1 2.96
0.4 2.7 2.00 2.16
2.01 0.4 0.80

2 Pasang FD2 Ornamen GRC Cetak Krawangan + Rangka Hollow dan Pengecatan 11.52
1.8 3.2 2.00 11.52

3 Pasang Listplank GRC + Rangka dan Pengecatan 42.58


16.1 2.00 32.20
7.89 2.00 15.78

4 Pasang List Profil Beton FD1 + Pengecatan 23.58


3.1 2 6.2
3.43 2 6.86
0.43 2 0.86
2.64 2 5.28
0.2 2 0.4
1.99 2 3.98

II PEKERJAAN RAILING TANGGA, HAND RAILING DAN PENUNJANG DISABILITAS


1 Hand Railing Tangga Pipa Stainless Ø2" 6.20
6.2 6.20

2 Hand Railing Toilet Difabel, Pipa Stainless Ø2" 2.10


2.1 2.10

3 Hand Railing Ramp Difabel, Pipa Stainless Ø2" 22.05


12.45 12.45
0.8 12.00 9.60

4 Hand Railing Difabel Ruang PTSP, Pipa Stainless Ø2" 2.88


0.64 2.00 1.28
0.8 2.00 1.60

5 Rangka Hollow Railing Lantai 2 5.64


R1 1.65 1.2 1.98
R2 3.05 1.2 3.66

6 Guiding Block Difabel (Line Type) Rubber 30cm x 30cm 3.15


0.3 0.3 35.00 3.15

7 Guiding Block Difabel (Spot Type) Rubber 30cm x 30cm 0.81


0.3 0.3 9.00 0.81

III PEKERJAAN INTERIOR


1 Pasang Backdrop Ruang PTSP BD1 10.07
- Pasang Multiplek 9mm + Rangka Kayu 2.4 3 4.49
0.23 2.59 2.00 1.19
2.709 2.71

- Pasang HPL 10.07

Pasang Backdrop Ruang Balai Nikah dan Manasik Haji BD2


- Pekerjaan Multiplek 9mm + Rangka Kayu 25.30
6.97 3 16.12
1.94 2.56 4.97

- Pekerjaan Pasang HPL 25.30

- Pekerjaan Multiplek Perforated Finishing Cat Duco