REKAPITULASI

RENCANA ANGGARAN BIAYA

NAMA KEGIATAN : PEMBANGUNAN RUMAH DINAS KEJARI KAB. TEGAL


LOKASI : JL. PROF. MUHAMMAD YAMIN NO.16 SLAWI

NO. URAIAN PEKERJAAN JUMLAH TOTAL

1 2 3

I PEKERJAAN PERSIAPAN 10,846,114.55


II PEKERJAAN TANAH 1,685,663.87
III PEKERJAAN PONDASI 6,550,981.30
IV PEKERJAAN STRUKTUR 7,356,871.39
V PEKERJAAN DINDING 14,217,227.93
VI PEKERJAAN ATAP 6,426,473.26
VII PEKERJAAN LANTAI 2,191,633.84
VIII PEKERJAAN KUSEN 3,492,573.77
IX PEKERJAAN PLAFOND 3,404,122.15
X PEKERJAAN FINISHING 2,852,563.20
XI PEKERJAAN MEKANIKAL
XI.I PEKERJAAN SANITAIR 1,829,326.51
XI.II PEKERJAAN AIR BERSIH DAN AIR KOTOR 5,521,952.13
XII PEKERJAAN ELEKTRIKAL 1,680,699.20
JUMLAH 68,056,203.09
PPN 10% 6,805,620.31
JUMLAH TOTAL 74,861,823.40
JUMLAH TOTAL DIBULATKAN 74,861,000.00

Terbilang " SATU MILYAR TUJUH RATUS EMPAT PULUH TIGA JUTA SEMBILAN PULUH ENAM RIBU RUPIAH"

Rekap RAB - Th. 2019 - Halaman 1


RAB
RENCANA ANGGARAN BIAYA

NAMA KEGIATAN : PEMBANGUNAN RUMAH DINAS KEJARI KAB. TEGAL


LOKASI : JL. PROF. MUHAMMAD YAMIN NO.16 SLAWI

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN VOLUME
(Rp) (Rp)
KODE ANAL
1 2 3 4 5 6

I PEKERJAAN PERSIAPAN 10,846,114.55

1 Pembuatan papan nama proyek uk. 100 x 120 cm LS 1.00 bh 200,000.00 200,000.00
2 Pembuatan Gudang semen & Peralatan A.2.2.1.7 4.00 m2 834,725.20 3,338,900.80
3 Membersihkan lapangan dan perataan lahan A.2.2.1.7 16.00 m² 15,237.50 243,800.00
4 Pengukuran dan pemasangan bowplank A.2.2.1.4 15.00 m' 190,894.25 2,863,413.75
5 Mobilisasi dan demobilisasi - 1.00 ls 2,700,000.00 2,700,000.00
6 Alat bantu kerja - 1.00 ls 1,000,000.00 1,000,000.00
7 Listrik dan air kerja - 1.00 ls 500,000.00 500,000.00

II PEKERJAAN TANAH 1,685,663.87

1 Pekerjaan galian tanah biasa max kedalaman 1 m' A.2.3.1.1 8.40 m³ 61,215.94 514,213.87
2 Pekerjaan urugan tanah kembali bekas galian dipadatkan (Per 20 cm) A.2.3.1.10 2.80 m³ 46,833.75 131,134.50
3 Pekerjaan urugan tanah A.2.3.1.11a 7.89 m³ 131,894.20 1,040,315.49

III PEKERJAAN PONDASI 6,550,981.30

Pekerjaan pondasi batu kali


1 Pekerjaan urugan pasir dibawah pondasi t 5 cm A.2.3.1.11 0.68 m³ 270,600.75 182,655.51
2 Pekerjaan batu kosong (Anstamping) A.3.2.1.9 2.70 m³ 580,687.78 1,567,857.02
3 Pekerjaan pondasi batu belah campuran 1 SP : 5 PP A.3.2.1.3 5.25 m³ 914,375.01 4,800,468.78

IV PEKERJAAN STRUKTUR 7,356,871.39

1 Pekerjaan sloof beton bertulang uk. 12 x 20 cm 1,810,016.14


Beton K175 0.36 m3 901,567.21 324,564.19
Besi 64.54 kg 12,350.00 797,093.70
Bekisting 6.00 m2 114,726.38 688,358.25
2 Pekerjaan kolom praktis beton bertulang uk. 12 x 12 cm 3,178,722.13
Beton K175 0.38 m3 901,567.21 340,792.40
Besi 106.24 kg 12,350.00 1,312,068.94
Bekisting 12.60 m2 121,100.06 1,525,860.79
3 Pekerjaan balok beton bertulang uk. 8 x 12 cm 2,368,133.12
Beton K175 0.29 m3 901,567.21 259,651.36
Besi 51.00 kg 12,350.00 629,850.00
Bekisting 12.21 m2 121,100.06 1,478,631.76

V PEKERJAAN DINDING 14,217,227.93

1 Pekerjaan dinding bata merah tebal ½ bata, camp.1SP : 4PP A.4.4.1.9 40.15 m² 140,741.02 5,650,751.78
2 Pekerjaan plesteran dinding 1SP : 5PP tebal 15 mm A.4.4.2.5 80.30 m² 61,424.81 4,932,411.88
3 Pekerjaan acian dinding A.4.4.2.27 80.30 m² 34,675.95 2,784,478.78
4 Pekerjaan dinding keramik uk. 20 x 20 cm KM/WC A.4.4.3.54 3.76 m² 225,953.59 849,585.48

VI PEKERJAAN ATAP 6,426,473.26

1 Pekerjaan pemasangan rangka atap genteng press jatiwangi kayu kruing A.4.6.1.16a 22.00 m² 117,047.17 2,575,037.80
2 Pemasangan konstruksi gording. Kayu kruing A.4.6.1.15 0.03 m³ 9,872,037.00 284,314.67
3 Pekerjaan pemasangan Atap genteng press jatiwangi A.4.5.2.2a 22.00 m² 88,689.15 1,951,161.30
4 Pemasangan nok kerpus - 4.00 m' 142,500.00 570,000.00

RAB - Th. 2019 - Halaman 2


HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME
(Rp) (Rp)
KODE ANAL
1 2 3 4 5 6

5 Pemasangan Lisplank Uk (3x20) cm Kayu Jati A.4.6.1.21 8.00 m' 130,744.94 1,045,959.50

VI PEKERJAAN LANTAI 2,191,633.84

1 Pekerjaan pasir dibawah lantai t 5 cm A.2.3.1.11 0.80 m³ 257,070.71 205,656.57


2 Pasang lantai keramik uk. 40 x 40 cm polos - 13.75 m² 133,219.45 1,831,767.44
3 Pasang lantai keramik uk. 20 x 20 cm KM/WC anti slip - 2.25 m² 156,372.86 154,209.83

VII PEKERJAAN KUSEN 3,492,573.77

Pekerjaan pintu 2,285,193.92


1 Pekerjaan type P1 1,985,193.92
Pembuatan & Pemasangan Kusen Pintu kayu kruing A.4.6.1.1 0.03 m³ 11,950,886.25 393,064.65
Pembuatan & Pemasangan Pintu A.4.6.1.9 1.72 m² 733,639.05 1,258,924.61
Pemasangan Engsel Pintu A.4.6.2.5 4.00 bh 47,591.20 190,364.80
Pemasangan Handle Pintu - 1.00 bh 95,000.00 95,000.00
Pemasangan Kunci Selot A.4.6.2.11 1.00 bh 47,839.86 47,839.86

2 Pekerjaan pintu type P3 300,000.00


1 set Pintu PVC (Kamar Mandi) - 1.00 bh 300,000.00 300,000.00

Pekerjaan jendela 907,379.85


Pembuatan & Pemasangan Kusen Jendela kayu Kruing A.4.6.1.1 0.02 m³ 11,950,886.25 298,114.86
Pembuatan & Pemasangan Daun Jendela A.4.6.1.7 0.41 m² 580,554.50 238,027.34

RAB - Th. 2019 - Halaman 3


HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME
(Rp) (Rp)
KODE ANAL
1 2 3 4 5 6

Pemasangan Kaca t=5 mm A.4.6.2.17 0.63 m² 199,767.72 125,853.66


Pemasangan Engsel Jendela A.4.6.2.5 4.00 bh 47,592.04 190,368.14
Pemasangan Kunci Selot A.4.6.1.7 1.00 bh 55,015.84 55,015.84

VIII PEKERJAAN PLAFOND 3,404,122.15

1 Pekerjaan rangka plafond (Kayu kaso 5/7) - 16.00 m² 129,170.25 2,066,724.00


2 Pasang plafond dari GRC - 16.00 m² 46,106.50 737,704.00
3 Pasang list plafond gypsum 15 mm - 22.00 m' 27,258.83 599,694.15

IX PEKERJAAN FINISHING 2,852,563.20

1 Pekerjaan pengcatan dinding baru A.4.7.1.10 94.50 m² 22,228.18 2,100,563.20


2 Pekerjaan pengecatan plafond - 16.00 m² 47,000.00 752,000.00

X PEKERJAAN MEKANIKAL
X.I PEKERJAAN SANITAIR 1,829,326.51

1 Pasang closet jongkok A.5.1.1.2 1.00 unit 589,122.00 589,122.00


2 Pekerjaan meja beton untuk dapur Ls 1.00 LS 900,000.00 900,000.00
3 Pasang bak cuci piring stainless steel A.5.1.1.12 1.00 unit 219,549.38 219,549.38
4 Pasang kran air dia. 1/2" A.5.1.1.19 1.00 bh 77,673.88 77,673.88
5 Pasang floordrain A.5.1.1.14 1.00 bh 42,981.25 42,981.25

X.II PEKERJAAN AIR BERSIH DAN AIR KOTOR 5,521,952.13

1 Pasang pipa PVC air bersih dia. 3/4" tipe AW A.5.1.1.25 10.00 m 27,013.50 270,135.00

RAB - Th. 2019 - Halaman 4


HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME
(Rp) (Rp)
KODE ANAL
1 2 3 4 5 6

2 Pasang pipa PVC air kotor dia. 2" A.5.1.1.29 5.00 m 48,205.13 241,025.63
3 Pasang pipa PVC air kotor dia. 4" A.5.1.1.32 5.00 m 82,158.30 410,791.50
4 Pemasangan Bak Tandon Air fiber is 500 Ltr Ls 1.00 bh 1,000,000.00 1,000,000.00
5 Pasang septictank berikut rembesan Ls 1.00 bh 3,600,000.00 3,600,000.00

XI PEKERJAAN ELEKTRIKAL 1,680,699.20

1 Pasang MCB 2 A Ls 1.00 bh 80,000.00 80,000.00


2 Pasang box meteran 2 group Ls 1.00 bh 218,500.00 218,500.00
3 Pasang lampu downlight 13 watt (philips) A.8.4.6.1 4.00 bh 33,000.00 132,000.00
4 Pasang instalasi kabel listrik untuk lampu Ls 10.00 m 20,000.00 200,000.00
5 Pasang stop kontak Ls 2.00 bh 262,549.80 525,099.60
6 Pasang saklar single Ls 2.00 bh 262,549.80 525,099.60
7 Pasang saklar double Ls 1.00 bh 262,549.80 262,549.80

RAB - Th. 2019 - Halaman 5


PERHITUNGAN VOLUME PEKERJAAN

NAMA PEKERJAAN : PAGAR RUMAH DINAS KEJARI KAB. TEGAL


LOKASI : JL. PROF. MUHAMMAD YAMIN NO.16 SLAWI

Uraian Perhitungan
No Nama Barang / Jenis Pekerjaan
P x L x T x Unit = Vol. Sat.
1 2 5

I PEKERJAAN PERSIAPAN

1 Pembuatan papan nama proyek uk. 100 x 120 cm 2.00 2.00 bh


2 Pembuatan rumah jaga (Konstruksi Kayu) m2
3 Pembuatan Gudang semen & Peralatan 2.00 2.00 1.00 4.00 m2
4 Pembuatan bedeng pekerja 2.00 3.00 1.00 6.00 m²

5 Pembuatan pagar sementara dari seng gelombang tinggi 2 m m'


6 Membersihkan lapangan dan perataan lahan 4.00 4.00 1.00 16.00 m²

7 Pengukuran dan pemasangan bowplank 15.00 m'


4.00 2.00 8.00 m'
2.00 2.00 4.00

1.50 2.00 3.00

8 Mobilisasi dan demobilisasi 1.00 Pkt


9 Alat bantu kerja 1.00 Pkt
10 Listrik dan air kerja 1.00 Pkt

II PEKERJAAN TANAH
1 Pekerjaan galian tanah biasa max kedalaman 1 m' 8.40 m3
4.00 0.80 0.70 2.00 4.48
2.00 0.80 0.70 2.00 2.24
1.50 0.80 0.70 2.00 1.68
8.40
2 Pekerjaan urugan tanah kembali bekas galian dipadatkan (Per 20 cm) 1.00 : 3.00 x 8.40 2.80 m3
3 Pekerjaan urugan tanah 7.89 m3
4.00 2.50 0.50 1.00 5.00
1.50 2.50 0.50 1.00 1.88
1.50 1.50 0.45 1.00 1.01

III PEKERJAAN PONDASI P x L x T x Unit = Vol. Sat.


1 Pekerjaan urugan pasir dibawah pondasi t 5 cm 15.00 0.90 0.05 1.00 0.68
2 Pekerjaan batu kosong (Anstamping) 15.00 0.90 0.20 1.00 2.70 m3
3 Pekerjaan pondasi batu belah campuran 1 SP : 5 PP 5.25 m3
Pondasi Type A Horizontal 4.00 0.50 0.70 2.00 2.80
2.00 0.50 0.70 2.00 1.40
1.50 0.50 0.70 2.00 1.05
5.25

III PEKERJAAN STRUKTUR P x L x T x Unit = Vol. Sat.


1 Pekerjaan sloof beton bertulang uk. 12 x 20 cm
Beton K175 15.00 0.12 0.20 1.00 0.36 m3
Besi dia 12 15.00 4.00 0.85 51.00 kg
Besi dia 6 0.61 x 15.00 : 0.15 x 0.22 13.54 kg
Bekisting 15.00 0.20 2.00 6.00 m2

2 Pekerjaan kolom praktis beton bertulang uk. 12 x 12 cm


Beton K175 0.01 3.75 7.00 0.38 m3
Besi dia 12 3.75 4.00 0.85 7.00 89.25 kg
Besi dia 6 0.41 x 4.00 : 0.15 x 0.22 16.99 kg
Bekisting 3.75 0.12 4.00 7.00 12.60 m2

3 Pekerjaan balok beton bertulang uk. 8 x 12 cm


Beton K175 15.00 0.08 0.12 2.00 0.29 m3
Besi dia 12 15.00 4.00 0.85 51.00 kg
Besi dia 6 0.55 x 15.00 : 0.15 x 0.22 12.21 kg
Bekisting 15.00 0.20 2.00 6.00 m2

IV PEKERJAAN DINDING P x L x T x Unit = Vol. Sat.


1 Pekerjaan dinding bata merah tebal ½ bata, camp.1Pc : 5Ps 13.50 3.50 1.00 47.25 m2
2 Pekerjaan plesteran dinding 1Pc : 5Ps tebal 15 mm 27.00 3.50 1.00 94.50 m2
3 Pekerjaan acian dinding 27.00 3.50 1.00 94.50 m2
4 Pekerjaan dinding keramik uk. 20 x 20 cm KM/WC 7.00 1.00 1.00 7.00 m3

V PEKERJAAN ATAP P x L x T x Unit = Vol. Sat.


1 Pekerjaan pemasangan rangka atap genteng press jatiwangi kayu kruing 2.75 4.00 2.00 22.00 m2
2 Pemasangan konstruksi gording. Kayu kruing 4.00 0.01 1.00 1.00 0.03
3 Pekerjaan pemasangan Atap genteng press jatiwangi 2.75 4.00 2.00 22.00 M2
4 Pemasangan nok kerpus 4.00 1.00 4.00
5 Pemasangan Lisplank Uk (3x20) cm Kayu Jati 8.00 1.00 8.00

VI PEKERJAAN LANTAI P x L x T x Unit = Vol. Sat.


1 Pekerjaan pasir dibawah lantai t 5 cm 0.80 m3
4.00 2.50 0.05 1.00 0.50
1.50 2.50 0.05 1.00 0.19
1.50 1.50 0.05 1.00 0.11
2 Pasang lantai keramik uk. 40 x 40 cm polos 13.75 m2
4.00 2.50 1.00 10.00
1.50 2.50 1.00 3.75
13.75
3 Pasang lantai keramik uk. 20 x 20 cm KM/WC anti slip 1.50 1.50 1.00 2.25 m2

VII PEKERJAAN KUSEN P x L x T x Unit = Vol. Sat.


1 Pekerjaan type P1
Pembuatan & Pemasangan Kusen Pintu kayu kruing 0.03 m3
Balok Horizontal 0.90 0.06 0.12 1.00 0.01
Balok Vertical 4.30 0.06 0.12 1.00 0.03
0.03
Pembuatan & Pemasangan Pintu 0.80 2.15 1.00 1.72 m2
Pemasangan Engsel Pintu 2.00 2.00 4.00 bh
Pemasangan Handle Pintu 1.00 1.00 pkt
Pemasangan Kunci Selot 1.00 1.00 bh

3 Pekerjaan pintu type P3 (6 unit) 1.00


1 set Pintu PVC (Kamar Mandi) 1.00 1.00 pkt

Pekerjaan jendela
1 Pekerjaan Jendela J1 (24 Unit)
Pembuatan & Pemasangan Kusen Jendela kayu Kruing 0.02 m3
Balok Horizontal 0.75 0.07 0.14 1.00 0.01
Balok Vertical 3.40 0.05 0.12 1.00 0.02
0.02
Pembuatan & Pemasangan Daun Jendela 0.41 1.00 0.41 m2
Pemasangan Kaca t=5 mm 1.40 0.45 1.00 0.63 m2
Pemasangan Engsel Jendela 2.00 2.00 4.00 bh
Pemasangan Kunci Selot 1.00 1.00 1.00 bh

VIII PEKERJAAN PLAFOND P x L x T x Unit = Vol. Sat.


1 Pekerjaan rangka plafond (Kayu kaso 5/7) 16.00 m2
4.00 2.50 1.00 10.00
1.50 2.50 1.00 3.75
1.50 1.50 1.00 2.25
2 Pasang plafond dari GRC 16.00 m2
Uraian Perhitungan
No Nama Barang / Jenis Pekerjaan
P x L x T x Unit = Vol. Sat.
1 2 5

3 Pasang list plafond gypsum 15 mm 22.00 m'

IX PEKERJAAN FINISHING P x L x T x Unit = Vol. Sat.


1 Pekerjaan pengcatan dinding baru 27.00 3.50 1.00 94.50 m2
2 Pekerjaan pengecatan plafond 16.00 m2

X PEKERJAAN MEKANIKAL P x L x T x Unit = Vol. Sat.


X.I Pekerjaan Sanitair
1 Pasang closet jongkok 1.00 bh
2 Pekerjaan meja beton untuk dapur 1.00 Bh
3 Pasang bak cuci piring stainless steel 1.00 Bh
4 Pasang kran air dia. 1/2" 1.00 Bh
5 Pasang floordrain 1.00 Bh

X.II Pekerjaan Air Bersih & Air Kotor


1 Pasang pipa PVC air bersih dia. 3/4" tipe AW 10.00 1.00 10.00 m'
2 Pasang pipa PVC air kotor dia. 2" 5.00 1.00 5.00 m'
3 Pasang pipa PVC air kotor dia. 4" 5.00 1.00 5.00 m'
4 Pemasangan Bak Tandon Air fiber is 500 Ltr 1.00 1.00 bh
5 Pasang septictank berikut rembesan 1.00 1.00 pkt

XI PEKERJAAN MEKANIKAL P x L x T x Unit = Vol. Sat.


1 Pasang MCB 2 A 1.00 1.00 bh
2 Pasang box meteran 2 group 1.00 1.00 bh
3 Pasang lampu downlight 13 watt (philips) 4.00 1.00 4.00 bh
4 Pasang instalasi kabel listrik untuk lampu 10.00 1.00 10.00 m'
5 Pasang stop kontak 2.00 1.00 2.00 nh
6 Pasang saklar single 2.00 1.00 2.00 bh
7 Pasang saklar double 1.00 1.00 1.00 bh
PENJELASAN TENTANG OVERHEAD + PROFIT SESUAI DENGAN LAMPIRAN PERATURAN MENTERI
PEKERJAAN UMUM DAN PERUMAHAN RAKYAT NOMOR : 28/PRT/M/2016 TENTANG
ANALISIS HARGA SATUAN PEKERJAAN BIDANG PEKERJAAN UMUM
Termuat Dalam Bagian 1 Analisis Harga Satuan Pekerjaan (AHSP) Bidang Umum, pada bagian :

a. 3.Istilah dan definisi


3.32 overhead
biaya yang diperhitungkan sebagai biaya operasional dan pengeluaran biaya kantor pusat yang bukan dari
biaya pengadaan untuk setiap mata pembayaran, biaya manajemen, akuntansi, pelatihan dan auditing,
perizinan, registrasi, biaya iklan, humas dan promosi, dan lain sebagainya
b. 5.Ketentuan dan persyaratan
5.3 Harga satuan pekerjaan (HSP)
5.3.4 Biaya umum dan keuntungan (overhead & profit)
Biaya umum adalah biaya tidak langsung yang dikeluarkan untuk mendukung terwujudnya pekerjaan
(kegiatan pekerjaan) yang bersangkutan, atau biaya yang diperhitungkan sebagai biaya operasional
meliputi pengeluaran untuk:
a) Biaya kantor pusat yang bukan dari biaya pengadaan untuk setiap mata pembayaran
b) Biaya upah pegawai kantor lapangan
c) Biaya manajemen (bunga bank, jaminan bank, tender, dan lain-lain)
d) Biaya akuntansi
e) Biaya pelatihan dan auditing
f) Biaya perizinan dan registrasi
g) Biaya iklan, humas dan promosi
h) Biaya penyusutan peralatan penunjang
i) Biaya kantor, listrik, telepon dll
j) Biaya pengobatan pegawai kantor/lapangan
k) Biaya travel, pertemuan/rapat
l) Biaya asuransi di luar peralatan
m) Biaya Keselamatan dan Kesehatan Kerja (K3) Konstruksi yang bersifat umum sesuai dengan
Peraturan Menteri Pekerjaan Umum Nomor 5 Tahun 2014 tentang
Pedoman Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3) Konstruksi Bidang Perkerjaan Umum.
n) dan lain sebagainya

Biaya umum/overhead ini dihitung berdasarkan persentase dari biaya langsung yang besarnya tergantung dari
lama waktu pelaksanaan pekerjaan, besarnya tingkat bunga yang berlaku dan lain sebagainya sesuai dengan ketentuan.
Keuntungan ini sudah termasuk biaya risiko pekerjaan selama pelaksanaan dan masa pemeliharaan dalam kontrak pekerjaan.
Besarnya biaya umum dan keuntungan ditentukan dengan mempertimbangkan antara lain
tingkat suku bunga pinjaman bank yang berlaku, tingkat inflasi, overhead kantor pusat dan lapangan,
dan resiko investasi. Ini merupakan domain penyedia jasa yang sampai dengan saat ini belum ada ketentuan resmi
dari Pemerintah yang mengatur nilai maksimum biaya umum dan keuntungan penyedia jasa.

HPS disusun dengan memperhitungkan keuntungan dan biaya overhead yang dianggap wajar
(Perpres Nomor 70 Tahun 2012, Pasal 66, Ayat 8), suatu nilai optimum yang relatif dekat dengan
tingkat suku bunga Bank Indonesia.

Penjelasan Perpres Nomor 70 Tahun 2012, Pasal 66, Ayat 8


Ayat (8) Contoh keuntungan dan biaya Overhead yang wajar untuk Pekerjaan Konstruksi
MAKSIMAL 15% (lima belas perseratus).
DAFTAR HARGA SATUAN PERALATAN

KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN : 2019

BIAYA SEWA
No. URAIAN KODE HP KAP. ALAT/JAM di luar
PPN (Rp.)

1 ASPHALT MIXING PLANT E01 294.00 60.00 T/Jam 7,370,265.77


2 ASPHALT FINISHER E02 72.40 10.00 Ton 1,248,008.33
3 ASPHALT SPRAYER E03 4.00 850.00 Liter 69,604.80
4 BULLDOZER 100-150 HP E04 155.00 - - 536,822.37
5 COMPRESSOR 4000-6500 L\M E05 60.00 5,000.00 CPM/(L/m) 209,167.26
6 CONCRETE MIXER 0.3-0.6 M3 E06 20.00 300.00 Liter 83,759.29
7 CRANE 10-15 TON E07 138.00 15.00 Ton 495,873.61
8 DUMP TRUCK 3.5 TON E08 100.00 3.50 Ton 351,479.99
9 DUMP TRUCK 10 TON E09 190.00 10.00 Ton 476,116.23
10 EXCAVATOR 80-140 HP E10 133.00 0.93 M3 642,865.02
11 FLAT BED TRUCK 3-4 M3 E11 190.00 10.00 ton 490,803.56
12 GENERATOR SET E12 180.00 135.00 KVA 501,208.00
13 MOTOR GRADER >100 HP E13 135.00 10,800.00 - 891,372.51
14 TRACK LOADER 75-100 HP E14 70.00 0.80 M3 324,847.86
15 WHEEL LOADER 1.0-1.6 M3 E15 96.00 1.50 M3 650,066.17
16 THREE WHEEL ROLLER 6-8 T E16 55.00 8.00 Ton 249,958.00
17 TANDEM ROLLER 6-8 T. E17 82.00 8.10 Ton 360,717.72
18 TIRE ROLLER 8-10 T. E18 100.50 9.00 Ton 593,809.06
19 VIBRATORY ROLLER 5-8 T. E19 82.00 7.05 Ton 349,419.78
20 CONCRETE VIBRATOR E20 5.50 25.00 - 46,845.58
21 STONE CRUSHER E21 220.00 60.00 T/Jam 927,455.70
22 WATER PUMP 70-100 mm E22 6.00 - - 39,929.58
23 WATER TANKER 3000-4500 L. E23 100.00 4,000.00 Liter 328,432.18
24 PEDESTRIAN ROLLER E24 8.80 835.00 Ton 87,346.82
25 TAMPER E25 4.70 121.00 Ton 46,435.85
26 JACK HAMMER E26 - 1,330.00 - 28,914.12
27 FULVI MIXER E27 345.00 2,005.00 - 971,902.72
28 CONCRETE PUMP E28 100.00 8.00 M3 543,288.55
29 TRAILER 20 TON E29 175.00 20.00 Ton 515,051.23
30 PILE DRIVER + HAMMER E30 25.00 2.50 Ton 189,658.00
31 WELDING SET E32 40.00 250.00 Amp 110,217.95
32 BORE PILE MACHINE E33 150.00 2,000.00 Meter 1,117,578.53
33 ASPHALT LIQUID MIXER E34 5.00 1,000.00 Liter 40,216.75
34 TRONTON E35 150.00 15.00 Ton 543,826.97
35 COLD MILLING E36 248.00 1,000.00 m 1,044,875.22
36 ROCK DRILL BREAKER E37 3.00 - - 56,710.71
37 COLD RECYCLER E38 900.00 2,200.00 M 1,858,285.71
38 HOT RECYCLER E39 400.00 3.00 M 853,285.71
39 AGGREGAT (CHIP) SPREADER E40 115.00 3.50 M 333,910.71
40 ASPHALT DISTRIBUTOR E41 115.00 4,000.00 Liter 369,689.47

HALAMAN 9 DARI 229 HALAMAN


BIAYA SEWA
No. URAIAN KODE HP KAP. ALAT/JAM di luar
PPN (Rp.)

41 SLIP FORM PAVER E42 105.00 2.50 M 260,335.71


42 CONCRETE PAN MIXER E43 134.00 600.00 Liter 435,731.83
43 CONCRETE BREAKER E44 290.00 20.00 m3/jam 632,185.71
44 ASPAHLT TANKER E45 190.00 4,000.00 liter 450,328.57
45 CEMENT TANKER E46 190.00 4,000.00 liter 408,328.57
46 CONDRETE MIXER (350) E47 20.00 350.00 liter 72,126.61
47 VIBRATING RAMMER E48 4.20 80.00 KG 36,823.57
48 TRUK MIXER (AGITATOR) E49 220.00 5.00 M3 694,587.44
49 BORE PILE MACHINE E50 125.00 60.00 CM 335,803.57
50 CRANE ON TRACK 75-100 TON E51 200.00 75.00 Ton 428,428.57
51 BLENDING EQUIPMENT E52 50.00 30.00 Ton 228,835.52

HALAMAN 10 DARI 229 HALAMAN


BIAYA SEWA
No. URAIAN KODE HP KAP. ALAT/JAM di luar
PPN (Rp.)

52 ASPHALT LIQUID MIXER E34a 40.00 20,000.00 Liter 110,566.75


53 BAR BENDER E53 3.00 - 22,425.00
54 BAR CUTTER E54 3.00 - 22,425.00
55 BREAKER E55 80.00 3.00 m3/jam 187,228.57
56 GROUTING PUMP E56 100.00 15.00 Ton 227,428.57
57 JACK HIDROLIC E57 3.00 150.00 Ton 32,458.57
58 MESIN LAS E58 3.00 0.17 Ton 33,853.57
59 PILE DRIVER LEADER, 75 kw E59 70.00 75.00 kw 167,128.57
60 PILE HAMMER E60 10.00 - 51,178.57
61 PILE HAMMER, 2,5 Ton E61 1.00 2.50 Ton 28,438.57
62 STRESSING JACK E62 89.00 15.00 Ton 205,318.57
63 WELDING MACHINE, 300 A E63 5.00 - 36,478.57
64 CHAINSAW E64 2 ltr 32,783.94
65 TRIPOD/TRACKEL & HANDLE CRANE 2 T 2.00 ton 12,500.00
66 Pipe Support 187.5

Slawi, Desember 2019


Kepala Dinas Perumahan Rakyat, Kawasan Permukiman,
Tata Ruang dan Pertanahan Kabupaten Tegal

JAENAL DASMIN, BE, S.Sos, MM


NIP. 196510151989031008

HALAMAN 11 DARI 229 HALAMAN


DAFTAR HARGA SATUAN UPAH / TENAGA

KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN : 2019

NO. URAIAN SATUAN HARGA SATUAN (Rp.)

1 Pekerja OH 80,000.00
2 Mandor OH 105,000.00
3 Tukang Kayu OH 100,000.00
4 Kepala Tukang Kayu OH 105,000.00
5 Tukang Batu OH 100,000.00
6 Kepala Tukang Batu OH 105,000.00
7 Tukang Besi OH 100,000.00
8 Kepala Tukang Besi OH 105,000.00
9 Tukang Cat OH 100,000.00
10 Kepala Tukang Cat OH 105,000.00
11 Tukang Plitur OH 100,000.00
12 Tukang Jalan OH 100,000.00
13 Tukang Gali OH 100,000.00
14 Tukang Masak Aspal OH 100,000.00
15 Tukang Ledeng OH 100,000.00
16 Tukang Listrik OH 100,000.00
17 Kepala Tukang Listrik OH 105,000.00
18 Tukang Vibrator OH 100,000.00
19 Tukang Erection OH 100,000.00
20 Tukang Las OH 100,000.00
21 Kepala Tukang Cat OH 105,000.00
22 Masinis OH 105,000.00
23 Pembatu Masinis/ Pembantu Operator OH 80,000.00
24 Penjaga Malam OH 75,000.00
25 Operator Terlatih OH 105,000.00
26 Buruh Tak Terlatih OH 50,000.00
27 Buruh Terampil OH 100,000.00
28 Buruh Semi Terampil OH 75,000.00
29 Sopir OH 105,000.00
30 Pembantu Sopir OH 75,000.00

Slawi, Desember 2019


Kepala Dinas Perumahan Rakyat, Kawasan Permukiman,
Tata Ruang dan Pertanahan Kabupaten Tegal

JAENAL DASMIN, BE, S.Sos, MM


NIP. 196510151989031008

HALAMAN 12 DARI 229 HALAMAN


DAFTAR HARGA SATUAN BAHAN BANGUNAN
Wilayah Bawah ; Kec. Slawi, Dukuhwaru, Lebaksiu, Talang, Adiwerna, Pangkah (Kecuali Dermasuci), Tarub,
Dukuhturi, Pagerbarang, Kedungbanteng, Kramat, Suradadi, Warurejo, Balapulang (bawah), Margasari

KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN : 2019

HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

I BAHAN DASAR
1 BATU KALI
Batu Bulat Utuh m3 290,800.00
Batu Bulat Belah m3 332,800.00
Batu Pecah ukuran 10/15 cm m3 305,500.00
Batu Pecah ukuran 5/7 cm m3 282,000.00
Batu Pecah ukuran 3/5 cm m3 338,000.00
Batu sodong m3 245,000.00
2 KERIKIL
Kerikil Timbun m3 170,000.00
Sawur / Koral m3 170,000.00
Batu Split Pecah Mesin (0,5-<1 cm) (Screening) m3 282,000.00
Batu Split Pecah Mesin (0,5-<1 cm) (Screening) kg 352.50
Batu Split Pecah Mesin (1-2cm) m3 295,000.00
Batu Split Pecah Mesin (2-3 cm) m3 295,000.00
Batu Split Pecah Mesin (2-3 cm) kg 368.75
Batu Split Pecah Mesin (3-5 cm) m3 338,000.00
Batu Pecah dg tangan (5-7 cm) m3 282,000.00
Abu batu m3 275,000.00
Abu batu kg 343.75
Kerikil Biasa m3 170,000.00
Tras Giling m3 305,500.00
Batu kerikil pecah tersaring m3 423,000.00
3 BATU BATA
Batu Bata 3 x 11 x 22 (20) bh 1,050.00
Batu Bata 5 x 11 x 22 (20) bh 1,150.00
Bata ringan / Hebel (10 x 20 x 60) m3 750,000.00
Bata ringan / Hebel (10 x 20 x 60) bh 9,036.00
Bata ringan / Hebel (7,5 x 20 x 60) m3 585,000.00
Bata ringan / Hebel (7,5 x 20 x 60) bh 5,270.00
Batako Berlubang Hollow Blok HB-20 bh 2,100.00
Batako Berlubang Hollow Blok HB-15 bh 1,800.00
Batako Berlubang Hollow Blok HB-10 bh 1,620.00
4 PASIR
Pasir Urug m3 197,000.00
Pasir Pasang m3 318,000.00
Pasir Beton m3 345,000.00
Pasir Beton kg 431.25
Pasir Halus (untuk HRS) m3 318,000.00

HALAMAN 13 DARI 229 HALAMAN


HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Pasir Batu (Sirtu) m3 167,500.00


5 TANAH
Tanah Padas m3 70,000.00
Tanah Liat m3 70,000.00
Tanah Urug pilihan m3 80,000.00
Tanah Humus (untuk tanaman) m3 170,000.00
Batu kapur/ Limestone m3 100,000.00
Tanah batu (nahtu) m3 125,000.00
6 KAPUR
Kapur Pasang m3 200,000.00
Kapur Semen Merah kg 125.00
Kapur Semen Merah m3 175,000.00

HALAMAN 14 DARI 229 HALAMAN


HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

7 PORTLAND CEMENT
Portland Cement (PC) zak 56,000.00
Portland Cement (PC) kg 1,120.00
Semen Putih 40 kg zak 78,000.00
Semen Putih 50 kg zak 87,000.00
Semen warna (40 kg) zak 95,000.00
Semen warna kg 2,375.00
Mortar Perekat Hebel (40 kg) setara MU-380 zak 115,000.00
Mortar Perekat Hebel (40 kg) setara MU-380 kg 2,875.00
Semen Grouting MU (40 kg) setara MU-800 zak 157,000.00
Semen Grouting MU (40 kg) setara MU-800 kg 3,925.00
Perekat bata ringan zak 129,400.00
Plester bata ringan zak 80,000.00
Semen mortar warna abu (Acian bata ringan) 30 kg/zak zak 112,500.00
Semen mortar warna abu (Acian bata ringan) 30 kg/zak kg 3,750.00
Semen instan perekat material lantai zak 129,400.00
Semen instan perekat material dinding zak 223,600.00
Semen instan nat lantai & dinding kg 19,400.00
Floor hardener instan kg 16,000.00
Gypsump powder kg 5,500.00
II BAHAN PENUTUP ATAP
1 SIRAP
SIRAP (100 lbr) pak 180,000.00
SIRAP lbr 1,800.00
2 GENTENG BETON
Genteng Beton Warna standard bh 7,500.00
Genteng Beton Warna Special bh 8,000.00
Genteng Beton Warna Khusus bh 8,500.00
Kerpus Beton Warna Standard bh 8,000.00
Kerpus Beton Warna Special bh 8,500.00
Kerpus Beton Warna Khusus bh 9,000.00
3 GENTENG TANAH LIAT
Nok kerpus Kodok bh 4,000.00
Nok kerpus Kodok Glasur bh 7,000.00
Nok kerpus plentong super bh 7,500.00
Bubungan Genteng keramik "KIA" bh 10,700.00
Bubungan Genteng Morando bh 8,800.00
Bubungan Genteng Morando Glazur bh 9,500.00
Bubungan genteng pres jtw isi 4/m bh 6,500.00
Bubungan genteng pres kebumen bh 5,400.00
Nok Genteng Metal polos bh 27,000.00
Nok Genteng Metal pasir bh 30,000.00
Nok Genteng galvalum m' 27,000.00
Genteng Kodok bh 3,000.00
Genteng Kodok Glasur bh 4,400.00
Genteng Vlaam/Plentong bh 2,100.00
Genteng Plentong super besar 18 bh/m2 bh 4,500.00
Genteng Keramik Glazur KIA isi 15/m2 warna muda bh 7,000.00
Genteng Keramik Glazur KIA isi 14/m2 warna tua bh 6,850.00

HALAMAN 15 DARI 229 HALAMAN


HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Genteng Morando Natural isi 20/m2 oven 950x20 bh 3,100.00


Genteng Morando Glazur isi 20/m2 1550x20 bh 4,800.00
Genteng Pres Jatiwangi isi 25/m2 750x25 bh 2,400.00
Genteng Pres Kebumen bh 2,650.00
Genteng metal (polos) lb 62,000.00
Genteng metal (berpasir) lb 94,000.00
Genteng bekas (pres) bh 600.00
4 GENTENG KACA
Genteng kaca Vlaam tebal 8 mm bh 45,000.00
Genteng kaca Vlaam tebal 10 mm bh 55,000.00

HALAMAN 16 DARI 229 HALAMAN


HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Genteng kaca Kodok tebal 8 mm bh 47,000.00


Genteng kaca Kodok tebal 10 mm bh 57,000.00
5 ASBES GELOMBANG
Asbes gelombang besar
Bubungan asbes gelombang besar m1 30,000.00
Asbes gelombang besar 200 cm X 102 cm X 5 mm Lbr 85,000.00
Asbes gelombang besar 225 cm X 102 cm X 5 mm Lbr 90,000.00
Asbes gelombang besar 250 cm X 102 cm X 5 mm Lbr 95,000.00
Asbes gelombang besar 200 cm X 102 cm X 6 mm Lbr 85,000.00
Asbes gelombang besar 225 cm X 102 cm X 6 mm Lbr 90,000.00
Asbes gelombang besar 250 cm X 102 cm X 6 mm Lbr 96,000.00
Asbes Gelombang Kecil
Bubungan asebs gelombang besar m1 25,000.00
Asbes Gelombang Kecil 150 cm X 105 cm X 4 mm Lbr 32,000.00
Asbes Gelombang Kecil 180 cm X 105 cm X 4 mm Lbr 38,000.00
Asbes Gelombang Kecil 210 cm X 105 cm X 4 mm Lbr 42,000.00
Asbes Gelombang Kecil 240 cm X 105 cm X 4 mm Lbr 59,000.00
Asbes Gelombang Kecil 270 cm X 105 cm X 4 mm Lbr 65,000.00
Asbes Gelombang Kecil 300 cm X 105 cm X 4 mm Lbr 73,500.00
Atap bitumen ex. ONDULINE : 95 cm x 200cm x 0.3mm Lbr 165,000.00
Atap bitumen type ONDUVILLA : 40cm x 106 cm x 0,3mm Lbr 105,000.00
Nok atap bitumen (ex. onduline / onduvilla) Uk. 50cm x 50 cm x 0,3mm Lbr 125,000.00
NOK Jabes nok
. Kerpus Genteng bh 41,000.00
. Stel Besar bh 65,000.00
. Paten Besar bh 45,000.00
Nokstel gelombang harflex
. Stel Besar bh 44,000.00
. Patent Besar bh 27,000.00
. Plat besar bh 49,000.00
6 ASBES PLAT
. 100cm X 100 cm X 4 mm bh 16,000.00
. 100cm X 100 cm X 5 mm bh 17,000.00
. 50 cm X 200 cm X 3 mm bh 14,800.00
. 40 cm X 200 cm X 3 mm bh 13,500.00
FIBER PLAT uk. 100cm x 100cm x 4mm lbr 30,000.00
Untuk Plafond uk. 120cm x 240cm x 4mm lbr 80,000.00
uk. 122cm x 244cm x 4mm lbr 85,200.00
GRC BOARD uk.122cm x 244cm x 5mm lbr 112,000.00
uk.122cm x 244cm x 6mm lbr 135,000.00
uk.122cm x 244cm x 8mm lbr 201,500.00
uk.122cm x 244cm x 10mm lbr 260,000.00
7 FIBER GLASS (JABES)
180 X 92 cm bh 42,000.00
200 X 92 cm bh 48,000.00
250 X 92 cm bh 56,000.00
180 X 105 cm bh 47,000.00
210 X 105 cm bh 55,000.00
250 X 105 cm bh 65,000.00

HALAMAN 17 DARI 229 HALAMAN


HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

8 SENG PLAT
BJLS 0,20 lebar 55 cm m2 23,000.00
BJLS 0,20 lebar 55 cm m' 41,500.00
BJLS 0,30 lebar 55 cm m2 35,000.00
BJLS 0,30 lebar 55 cm m' 51,000.00
BJLS 0,30 lebar 90 cm m' 55,000.00
BJLS 0,20 lebar 90 cm m' 30,000.00

HALAMAN 18 DARI 229 HALAMAN


HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

9 SENG GELOMBANG
BJLS 0,18 panjang 180 cm lbr 48,000.00
BJLS 0,20 panjang 180 cm lbr 52,000.00
BJLS 0,30 panjang 180 cm lbr 58,000.00
BJLS 0,40 panjang 180 cm lbr 65,000.00
Seng bekas (laik pakai) lbr 24,200.00
Seng bekas (belum laik pakai) lbr 18,000.00
III. BAHAN KAYU
1 JATI
Papan m3 11,000,000.00
Balok/pesagen m3 10,800,000.00
2 KAMPER
Papan m3 13,600,000.00
Balok/pesagen m3 12,800,000.00
3 KRUING
Papan m3 8,000,000.00
Balok/pesagen m3 7,500,000.00
Kayu kruing 5/7 m3 4,730,000.00
Kayu kruing 4/5 m3 4,470,000.00
Kayu kruing 3/5 m3 5,575,000.00
Kayu kruing 3/4 m3 5,575,000.00
Kayu kruing 2/3 m3 4,470,000.00
4 MERANTI
Papan m3 5,000,000.00
Balok/pesagen m3 4,200,000.00
Kayu kruing 5/7 m3 3,110,000.00
Kayu kruing 4/6 m3 3,000,000.00
Kayu kruing 3/5 m3 3,025,000.00
Kayu kruing 2/3 m3 3,000,000.00
5 LANAN
Papan m3 2,250,000.00
Balok/pesagen m3 1,900,000.00
6 BENGKIRAI
Papan m3 13,200,000.00
Balok/pesagen m3 12,500,000.00
Kayu kruing 5/7 m3 10,000,000.00
Kayu kruing 4/6 m3 9,000,000.00
Kayu kruing 3/5 m3 9,000,000.00
Kayu kruing 2/3 m3 9,000,000.00
7 DOLKEN
Sedang 8 x 10 x 400 cm bt 22,000.00
Kecil 6 x 7 x 400 cm bt 18,000.00
Besar 10 x 12 x 400 cm bt 28,000.00
Kayu cetakan m3 2,200,000.00
Bambu btg 17,500.00
Papan cetak pinus m3 2,800,000.00
8 KEMPAS
Papan m3 6,000,000.00
Balok/pesagen m3 5,000,000.00

HALAMAN 19 DARI 229 HALAMAN


HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Kayu kruing 5/7 m3 4,354,300.00


Kayu kruing 4/6 m3 4,072,400.00
Kayu kruing 3/5 m3 5,100,000.00
Kayu kruing 3/4 m3 5,110,000.00
Kayu kruing 2/3 m3 4,000,000.00
9 LOKAL
Papan m3 1,450,000.00
Balok/pesagen m3 2,100,000.00
Kayu Lokal 5/7 m3 2,200,000.00
Kayu Lokal 4/6 m3 2,200,000.00
Kayu Lokal 2/3 m3 2,672,000.00
IV . BAHAN PENUTUP DINDING/LANTAI
1 UBIN (TEGEL BIASA)
PC polos 30 X 30 cm m2 41,000.00
PC polos 30 X 30 cm bh 3,727.27
20 X 20 cm m2 38,000.00
20 X 20 cm bh 3,454.55
PC warna 30 X 30 cm m2 45,000.00
30 X 30 cm bh 4,090.91
20 X 20 cm m2 42,000.00
20 X 20 cm bh 3,818.18
Teraso 30 X 30 cm m2 58,000.00
2 TEGEL PLINT
PC warna 10 X 20 cm bh 5,500.00
PC abu-abu 15 x 20 bh 6,000.00
3 UBIN PORSELIN
Lokal 11 X 11 putih dos 42,000.00
11 X 11 warna dos 46,000.00
Lokal 15 X 15 putih dos 51,000.00
15 X 15 warna dos 54,000.00

HALAMAN 20 DARI 229 HALAMAN


HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

4 MOZAIK PORSELIN
10 X 20 cm m2 56,000.00
15 X 15 cm m2 56,000.00
20 X 20 cm m2 57,000.00
20 X 25 cm m2 57,000.00
5 Keramik
Keramik 20/25, putih M2 54,000.00
Keramik 20/25, warna M2 56,000.00
Keramik 20/25, warna (bisa untuk dinding) buah 3,100.00
Keramik 25/40, warna (bisa untuk dinding) m2 80,000.00
Keramik 20/20, anti slip ( u/.lantai Km/wc) M2 63,000.00
Keramik 20/20, anti slip ( u/.lantai Km/wc) buah 2,500.00
Keramik 20/20, warna M2 55,000.00
Keramik 20/20, warna (bisa untuk dinding) buah 2,250.00
Keramik 20/20, warna (anti slip) m2 85,000.00
Keramik 10/20, warna M2 55,000.00
Keramik 10/20, warna buah 1,100.00
Keramik 30/30 (putih polos) M2 48,000.00
Keramik 30/30 (putih polos) buah 4,400.00
Keramik 30/30, warna M2 51,500.00
Keramik 30/30, anti selip M2 57,000.00
Keramik 40/40, (putih polos) M2 52,200.00
Keramik 40/40, (putih polos) buah 8,700.00
Keramik 40/40, warna M2 56,200.00
Keramik 40/40, Anti Slip M2 60,000.00
Keramik Uk. 5 x 20 cm Plint Bh 7,500.00
Keramik Uk. 10 x 20 cm Plint Bh 9,000.00
Keramik Uk. 10 x 30 cm Plint Bh 16,500.00
Keramik Uk. 10 x 40 cm Plint Bh 15,000.00
Keramik lis Uk. 7 x 20 Bh 9,000.00
Keramik lis Uk. 7 x 30 Bh 11,000.00
Keramik lis Uk. 13 x 40 Bh 14,000.00
Keramik kuku macan M' 7,500.00
6 Parquet Jati m2 185,000.00
lantai karpet vinyl m2 30,000.00
7 Batu Paros m2 120,000.00
8 Batu Tempel Hitam m2 120,000.00
9 Granite Tile
Granite tile Uk. 40 x 40 cm M2 169,300.00
Granite tile Uk. 40 x 40 cm 6bh / duz buah 28,250.00
Granite tile Uk. 30 x 30 cm M2 125,000.00
Granite tile Uk. 30 x 30 cm buah 11,400.00
Granite tile uk. 60 x 60 cm (nano) M2 165,000.00
Granite tile uk. 60 x 60 cm (nano) 4bh / duz buah 62,000.00
Granite tile uk. 60 x 60 cm (garuda) M2 130,000.00
Granite tile uk. 60 x 60 cm (garuda) 4bh / duz buah 43,500.00
Plint Granit 10 x 30 cm buah 3,850.00
Plint Granit 10 x 40 cm buah 4,400.00
Plint Granit 10 x 60 cm buah 15,000.00

HALAMAN 21 DARI 229 HALAMAN


HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Hospital plint granite 10x30 cm buah


Hospital plint PVC 5x30x5 r7 cm buah 15,000.00
10 Marmer m2 850,000.00
Batu Koral sikat 1-2 cm (putih) Kg 3,500.00
Batu Koral sikat 3-5 cm (putih) kg 5,000.00
Batu Koral sikat 1-2 cm (warna) kg 4,500.00
Batu Koral sikat 3-5 cm (warna) kg 6,000.00
V BAHAN CETAK
1 BUIS BETON
Buis beton Ø 10 cm - 100 cm bh 30,000.00
Buis beton Ø 20 cm - 100 cm bh 60,000.00
Buis beton Ø 30 cm - 100 cm bh 80,000.00
Buis beton Ø 50 cm - 100 cm bh 110,000.00
Buis beton Ø 60 cm - 100 cm bh 150,000.00
Buis beton Ø 70 cm - 100 cm bh 170,000.00
Buis beton U 10 cm - 100 cm bh 30,000.00
Buis beton U 15 cm - 100 cm bh 40,000.00

HALAMAN 22 DARI 229 HALAMAN


HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Buis beton U 20 cm - 100 cm bh 50,000.00


Buis beton U 30 cm - 100 cm bh 60,000.00
2 LUBANG ANGIN (ROSTER) PC + PASIR
Lubang angin (roster) Pc+pasir ukuran 10 X 20 cm bh 5,600.00
Lubang angin (roster) Pc+pasir ukuran 20 X 20 cm bh 6,200.00
Lubang angin (roster) Pc+pasir ukuran 25 X 25 cm bh 6,800.00
Lubang angin (roster) Pc+pasir ukuran 12 X 11 X 24 cm bh 7,000.00
Lubang angin (roster) Pc+pasir ukuran 30 X 30 cm bh 7,000.00
Lubang angin (roster) Pc+pasir ukuran 15 X 25 cm bh 7,250.00
Lubang angin (roster) Pc+pasir ukuran 15 X 30 cm bh 7,500.00
Roster bata bh 2,500.00
Glass Block bh 21,000.00
3 PAVING BLOCK (ex. JKB)
Paving block Persegi (model bata)tbl. 6 cm (K-175) ex. ALDAS m2 85,000.00
Paving block Persegi (model bata) tbl. 8 cm (K-175) ex. ALDAS m2 92,000.00
Paving block Segi enam (hexagonal) tbl. 6 cm (K-175) ex. ALDAS m2 85,000.00
Paving block Persegi (model bata) tbl. 6 cm warna (K-175) ex. ALDAS m2 95,000.00
Paving block Persegi (model bata) tbl. 8 cm warna (K-175) ex. ALDAS m2 102,000.00
Paving block Segi enam (hexagonal) tbl. 6 cm warna (K-175) ex. ALDAS m2 95,000.00
Kanstin beton uk. 50x12,5x30 (K-175) ex. ALDAS pcs 30,000.00
Kanstin beton uk. 15x25x40 (K-175) ex. ALDAS pcs 25,000.00
Paving block Persegi (model bata) tbl. 6 cm (K-225) ex. ALDAS m2 90,000.00
Paving block Persegi (model bata) tbl. 8 cm (K-225) ex. ALDAS m2 100,000.00
Paving block Segi enam (hexagonal) tbl. 6 cm (K-225) ex. ALDAS m2 90,000.00
Paving block Persegi (model bata) tbl. 6 cm warna (K-225) ex. ALDAS m2 100,000.00
Paving block Persegi (model bata) tbl. 8 cm warna (K-225) ex. ALDAS m2 110,000.00
Paving block Segi enam (hexagonal) tbl. 6 cm warna (K-225) ex. ALDAS m2 100,000.00
Paving block Persegi (model bata) tbl. 6 cm warna (K-250) ex. ALDAS M2 110,000.00
Paving block Persegi (model bata) tbl. 8 cm warna (K-250) ex. ALDAS M2 122,300.00
Kanstin beton uk. 50x12,5x30 (K-225) ex. JKB pcs 35,000.00
Kanstin beton uk. 15x25x40 (K-225) ex. JKB pcs 30,000.00
11 STANDARD GRASS BLOCK ABU-ABU BH 6,250.00
VI . BAHAN BESI
1 BESI BETON
Besi beton polos kg 11,500.00
Besi beton prestress kg 10,500.00
Besi beton ulir kg 11,800.00
2 BESI PLAT
Besi Strip uk. 3 mm x 3 cm x 6 m kg 15,000.00
Besi Strip m' 5,500.00
3 BESI PROFIL
Baja Profil kg 15,000.00
Besi Baja IWF kg 15,000.00
a BAJA RINGAN GALVALUME type CT 75
lebar : 7,5cm tebal : 1mm panj : 6 m btg 140,000.00
lebar : 7,5cm tebal : 1mm panj : 6 m kg 20,588.24
lebar : 7,5cm tebal : 0,75mm panj : 6 m btg 115,000.00
lebar : 7,5cm tebal : 0.75mm panj : 6 m kg 22,549.02
lebar : 7,5cm tebal : 0.65mm panj : 6 m btg 105,000.00

HALAMAN 23 DARI 229 HALAMAN


HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

lebar : 7,5cm tebal : 0,65mm panj : 6 m kg 24,418.60


b type RT 12 tinggi : 3,5 cm, tebal : 0,45mm panj : 6 m btg 62,500.00
type RT 10 tinggi : 3,0 cm, tebal : 0,45mm panj : 6 m btg 55,000.00
c HOLLOW GALVANIS LIPAT
Hollow galvanis uk.2/4 cm; tebal : 0,3 mm panj : 4 m btg 25,000.00
Hollow galvanis uk.3,6/3,6 cm; tebal : 0,3 mm panj : 4 m btg 37,000.00
Hollow galvanis uk.2/4 cm; tebal : 0,3 mm m' 15,000.00
Hollow galvanis uk.3,6/3,6 cm; tebal : 0,3 mm m' 21,000.00
Besi Hollow 4x 4 cm, tbl. 2mm panj : 6 m m' 31,500.00
Besi Hollow 2x 4 cm, tbl. 2mm panj : 6 m m' 23,000.00
Besi Hollow Panjang 4 m (Semua ukuran) kg 13,650.00
Spandex tbl. 0,3 mm m2 40,000.00
Bondex tbl. 0,75 mm m2 123,200.00

HALAMAN 24 DARI 229 HALAMAN


HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

4 JARING - JARING BAJA (RAM-RAMAN)


Jaring-jaring baja (ram-raman) Diameter 4 - 15 kg 15,000.00
Jaring-jaring baja (ram-raman) Diameter 6 - 15 kg 16,000.00
Wiremesh M.6 uk.5.4 m x 2.1 m m2 310,000.00
Wiremesh M.8 uk.5.4 m x 2.1 m m2 610,000.00
Wiremesh M.10 uk.5.4 m x 2.1 m m2 960,000.00
5 BESI SIKU
Besi siku L 40 X 40 X 4 panj : 6 m btg 137,500.00
Besi siku L 50 X 50 X 5 panj : 6 m btg 220,000.00
Besi siku L 60 X 60 X 6 btg 360,000.00
Besi List Kaca 1 x 1 cm m' 100,000.00
6 KAWAT
- Ikat beton/bendrat kg 20,000.00
- Harmonika 12 X 45 mm m2 21,000.00
- Harmonika 12 X 24 mm m2 22,500.00
- Harmonika 14 X 30 mm m2 20,000.00
- Harmonika 14 X 35 mm m2 19,000.00
- Kawat Nyamuk Nylon m2 10,000.00
- Kawat Kasa m2 13,000.00
- Saringan pasir m2 14,500.00
- Kawat loket m2 12,000.00
- Kawat duri rol 80,000.00
- Kawat duri m' 1,333.33
- Kawat bronjong kg 25,000.00
- Kawat bronjong pabrikasi (2x1x0,5 m) bh 355,000.00
- Kawat las doz 60,000.00
7 BAHAN ALUMUNIUM
Kusen Aluminium uk. 3" Silver (ex. Alexindo) m' 70,000.00
Kusen aluminium uk. 3" Brown (ex. Alexindo) m' 75,000.00
Kusen aluminium uk. 3" White (ex. Alexindo) m' 80,000.00
Kusen Aluminium uk. 4" Silver (ex. Alexindo) m' 96,500.00
Kusen aluminium uk. 4" Brown (ex. Alexindo) m' 98,500.00
Kusen aluminium uk. 4" White (ex. Alexindo) m' 102,000.00
Rangka pintu dan jendela (ex. Alexindo) m' 98,500.00
Allumunium Strip m' 28,000.00
VII . BAHAN PIPA
1 Pipa PVC SII SCJ , S - 12,5 (10 bar)
Pipa PVC AW ½" panjang 4 m btg 25,000.00
Pipa PVC AW ½" m' 6,250.00
Pipa PVC type AW ¾" panjang 4 m btg 34,000.00
Pipa PVC type AW ¾" m' 8,500.00
Pipa PVC type AW 1" panjang 4 m btg 44,500.00
Pipa PVC type AW 1" m' 11,125.00
Pipa PVC type AW 1 ½" panjang 4 m btg 55,000.00
Pipa PVC type AW 1 ½" m' 13,750.00
Pipa PVC type AW 2" panjang 4 m btg 79,000.00
Pipa PVC type AW 2" m' 19,750.00
Pipa PVC type AW 2 ½" " panjang 4 m btg 80,000.00
Pipa PVC type AW 2 ½" " m' 20,000.00

HALAMAN 25 DARI 229 HALAMAN


HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Pipa PVC type AW 3" panjang 4 m btg 127,000.00


Pipa PVC type AW 3" m' 31,750.00
Pipa PVC type AW 4" panjang 4 m btg 172,000.00
Pipa PVC type AW 4" m' 43,000.00
Pipa PVC type AW 6" panjang 4 m btg 423,000.00
Pipa PVC type AW 6" m' 105,750.00
Pipa PVC type AW 8" panjang 4 m btg 660,000.00
Pipa PVC type AW 8" m' 165,000.00
Pipa PVC type AW 10" panjang 4 m btg 1,025,000.00
Pipa PVC type AW 10" m' 256,250.00
Pipa PVC type AW 12" panjang 4 m btg 1,390,000.00
2 Pipa Medium A Galvanis - SII
Pipa Medium Galvanis 0,50" panjang 6 m btg 165,000.00
Pipa Medium Galvanis 0,50" m' 27,500.00
Pipa Medium Galvanis 0,75" panjang 6 m btg 205,000.00
Pipa Medium Galvanis 0,75" m' 34,166.67
Pipa Medium Galvanis 1" panjang 6 m btg 315,000.00
Pipa Medium Galvanis 1" m' 52,500.00
Pipa Medium Galvanis 1,25" panjang 6 m btg 390,000.00
Pipa Medium Galvanis 1,25" m' 65,000.00
Pipa Medium Galvanis 1,25" panjang 6 m btg 450,000.00
Pipa Medium Galvanis 1,25" m' 75,000.00
Pipa Medium Galvanis 2" panjang 6 m btg 600,000.00
Pipa Medium Galvanis 2" m' 100,000.00
Pipa Medium Galvanis 2,50" panjang 6 m btg 750,000.00
Pipa Medium Galvanis 2,50" m' 125,000.00
Pipa Medium Galvanis 3" panjang 6 m btg 980,000.00
Pipa Medium Galvanis 3" m' 163,333.33
Pipa Medium Galvanis 4" panjang 6 m btg 1,435,000.00
Pipa Medium Galvanis 4" m' 239,166.67
Pipa Medium Galvanis 5" panjang 6 m btg 1,910,000.00
Pipa Medium Galvanis 5" m' 318,333.33
Pipa Medium Galvanis 6" panjang 6 m m' 377,600.00
Pipa Medium Galvanis 8" m' 668,600.00
Pipa Medium Galvanis10" m' 1,200,000.00

HALAMAN 26 DARI 229 HALAMAN


HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

3 Pipa Air Bersih


Pipa PVC
Pipa PVC SNI (S.12,5 DN 100 mm (4") Solvent Cement Joint (SCJ): P = 6m m' 60,500.00
Pipa PVC SNI (S.12,6 DN 100 mm (4") Rubber Ring Joint (RRJ): P=6m m' 63,000.00
Pipa PVC SNI (S.12,7 DN 150 mm (6") Solvent Cement Joint (SCJ): P = 6m m' 129,400.00
Pipa PVC SNI (S.12,8 DN 150 mm (6") Rubber Ring Joint (RRJ): P=6m m' 133,300.00
Pipa PVC SNI (S.12,9 DN 200 mm (8") Rubber Ring Joint (RRJ): P=6m m' 211,800.00
Pipa PVC SNI (S.12,10 DN 250mm (8") Rubber Ring Joint (RRJ): P=6m m' 336,600.00
Pipa PVC SNI (S.12,10 DN 100 mm (4") Solvent Cement Joint (SCJ): P = 6m m' 75,000.00
Pipa PVC SNI (S.12,11 DN 100 mm (4") Rubber Ring Joint (RRJ): P=6m m' 77,800.00
Pipa PVC SNI (S.12,12 DN 150 mm (6") Solvent Cement Joint (SCJ): P = 6m m' 158,800.00
Pipa PVC SNI (S.12,13 DN 150 mm (6") Rubber Ring Joint (RRJ): P=6m m' 162,900.00
Pipa PVC SNI (S.12,14 DN 200 mm (8") Rubber Ring Joint (RRJ): P=6m m' 260,700.00
Pipa PVC SNI (S.12,15 DN 250mm (10") Rubber Ring Joint (RRJ): P=6m m' 404,400.00
PIPA HDPE/high density polyethlene SDR 17 (PN 10)
Pipa HDPE DN 50 mm (2") m' 37,500.00
Pipa HDPE DN 75 mm (3") m' 75,500.00
Pipa HDPE DN 100 mm (4") m' 112,800.00
Pipa HDPE DN 150 mm (6") m' 136,100.00
Pipa HDPE DN 200 mm (8") m' 367,700.00
Pipa HDPE DN 250 mm (10") m' 571,300.00
PIPA PVC SEWAGE
Pipa PVC Sewage Ø 1 1/4" ; Outside 40 mm panjang 6 m; kelas A : MOF m' 20,225.00
Pipa PVC Sewage Ø 1 1/4" ; Outside 40 mm panjang 6 m; kelas A:RR m' -
Pipa PVC Sewage Ø 1 1/4" ; Outside 40 mm panjang 6 m; kelas B : MOF m' 34,616.67
Pipa PVC Sewage Ø 1 1/4" ; Outside 40 mm panjang 6 m; kelas B:RR m' -
Pipa PVC Sewage Ø 1 1/2" ; Outside 50 mm panjang 6 m; kelas A : MOF m' 27,741.67
Pipa PVC Sewage Ø 1 1/2" ; Outside 50 mm panjang 6 m; kelas A:RR m' -
Pipa PVC Sewage Ø 1 1/2" ; Outside 50 mm panjang 6 m; kelas B : MOF m' 43,600.00
Pipa PVC Sewage Ø 1 1/2" ; Outside 50 mm panjang 6 m; kelas B:RR m' -
Pipa PVC Sewage Ø 2" : Outside 63 panjang 6 m; kelas A : MOF m' 32,908.33
Pipa PVC Sewage Ø 2" : Outside 63 panjang 6 m; kelas A:RR m' 33,891.67
Pipa PVC Sewage Ø 2" : Outside 63 panjang 6 m; kelas B : MOF m' 55,766.67
Pipa PVC Sewage Ø 2" : Outside 63 panjang 6 m; kelas B:RR m' 56,691.67
Pipa PVC Sewage Ø 1 1/2" ; Outside 75 mm panjang 6 m; kelas A : MOF m' 45,983.33
Pipa PVC Sewage Ø 1 1/2" ; Outside 75 mm panjang 6 m; kelas A:RR m' 47,166.67
Pipa PVC Sewage Ø 1 1/2" ; Outside 75 mm panjang 6 m; kelas B : MOF m' 65,333.33
Pipa PVC Sewage Ø 1 1/2" ; Outside 75 mm panjang 6 m; kelas B:RR m' 66,650.00
Pipa PVC Sewage Ø 3" : Outside 90 panjang 6 m; kelas B : MOF m' 55,691.67
Pipa PVC Sewage Ø 3" : Outside 90 panjang 6 m; kelas B:RR m' 57,283.33
Pipa PVC Sewage Ø 3" : Outside 90 panjang 6 m; kelas A : MOF m' 83,891.67
Pipa PVC Sewage Ø 3" : Outside 90 panjang 6 m; kelas A:RR m' 85,558.33
Pipa PVC Sewage Ø 4" : Outside 110 panjang 6 m; kelas B : MOF m' 79,266.67
Pipa PVC Sewage Ø 4" : Outside 110 panjang 6 m; kelas B:RR m' 81,450.00
Pipa PVC Sewage Ø 4" : Outside 110 panjang 6 m; kelas A : MOF m' 103,600.00
Pipa PVC Sewage Ø 4" : Outside 110 panjang 6 m; kelas A:RR m' 105,783.33
Pipa PVC Sewage Ø 6" : Outside 160 panjang 6 m; kelas B : MOF m' 163,283.33
Pipa PVC Sewage Ø 6" : Outside 160 panjang 6 m; kelas B:RR m' 167,058.33
Pipa PVC Sewage Ø 6" : Outside 160 panjang 6 m; kelas A : MOF m' 179,725.00

HALAMAN 27 DARI 229 HALAMAN


HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Pipa PVC Sewage Ø 6" : Outside 160 panjang 6 m; kelas A:RR m' 183,575.00
Pipa PVC Sewage Ø 8" : Outside 200 panjang 6 m; kelas B : MOF m' 247,500.00
Pipa PVC Sewage Ø 8" : Outside 200 panjang 6 m; kelas B:RR m' 254,633.33
Pipa PVC Sewage Ø 8" : Outside 200 panjang 6 m; kelas A : MOF m' 309,208.33
Pipa PVC Sewage Ø 8" : Outside 200 panjang 6 m; kelas A:RR m' 316,391.67
Pipa PVC Sewage Ø 10" : Outside 250 panjang 6 m; kelas B : MOF m' 414,741.67
Pipa PVC Sewage Ø 10" : Outside 250 panjang 6 m; kelas B:RR m' 426,025.00
Pipa PVC Sewage Ø 10" : Outside 250 panjang 6 m; kelas A : MOF m' 521,766.67
Pipa PVC Sewage Ø 10" : Outside 250 panjang 6 m; kelas A:RR m' 53,100.00
AKSESORIS PIPA
GATE VALVE
Gate Valve All Flange DN 75 mm bh 1,050,000.00
Gate Valve All Flange DN 100 mm bh 1,310,000.00
Gate Valve All Flange DN 150 mm bh 2,310,000.00
Gate Valve All Flange DN 200 mm bh 3,780,000.00
Gate Valve All Flange DN 250 mm bh 5,510,000.00
Flange socket PVC
Flange socket PVC DN 100 mm Rubber Ring Joint (RRJ) bh 260,000.00
Flange socket PVC DN 150 mm Rubber Ring Joint (RRJ) bh 577,500.00
Flange socket PVC DN 200 mm Rubber Ring Joint (RRJ) bh 843,500.00
Flange socket PVC DN 250 mm Rubber Ring Joint (RRJ) bh 1,617,000.00
TEE HDPE (PE 100)
Tee HDPE DN 150 x 100 mm Las bh 738,000.00
Tee HDPE DN 150 x 150 mm Las bh 670,000.00
Tee HDPE DN 200 x 150 mm Las bh 1,331,000.00
Tee HDPE DN 200 x 200 mm Las bh 1,100,000.00
Tee HDPE DN 250 x 150 mm Las bh 2,420,000.00
Tee HDPE DN 250 x 200 mm Las bh 2,420,000.00
Tee HDPE DN 250 x 250 mm Las bh 1,855,000.00
ALL FLANGE TEE
All Flange tee GI DN 100 x 100 mm (4x4) bh 375,000.00
All Flange tee GI DN 150 x 100 mm (6x4) bh 510,000.00
All Flange tee GI DN 150 x 150 mm (6x6) bh 550,000.00
All Flange tee GI DN 200 x 150 mm (8x6) bh 910,000.00
All Flange tee GI DN 200 x 200 mm (8x8) bh 960,000.00
All Flange tee GI DN 250 x 150 mm (10x6) bh 1,260,000.00
All Flange tee GI DN 250 x 200 mm (10x8) bh 1,350,000.00
All Flange tee GI DN 250 x 250 mm (10x10) bh 1,400,000.00
Bend All Flange
Bend All Flange
Bend All Flange DN 100 mm x 45' CI/Cast Iron bh 349,000.00
Bend All Flange DN 100 mm x 90' CI/Cast Iron bh 386,400.00
Bend All Flange DN 150 mm x 45' CI/Cast Iron bh 538,300.00
Bend All Flange DN 150 mm x 90' CI/Cast Iron bh 587,000.00
Bend All Flange DN 200 mm x 45' CI/Cast Iron bh 821,000.00
Bend All Flange DN 200 mm x 90' CI/Cast Iron bh 905,000.00
Bend All Flange DN 250 mm x 45' CI/Cast Iron bh 1,182,600.00
Bend All Flange DN 250 mm x 90' CI/Cast Iron bh 1,205,000.00
Bend PE-100

HALAMAN 28 DARI 229 HALAMAN


HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Bend PE - 100 DN 150 mm x 22.55' Las bh


Bend PE - 101 DN 150 mm x 45' Las bh 540,000.00
Bend PE - 102 DN 150 mm x 90' Las bh 680,000.00
Bend PE - 100 DN 200 mm x 22.55' Las bh
Bend PE - 101 DN 200 mm x 45' Las bh 920,000.00
Bend PE - 102 DN 200 mm x 90' Las bh 970,000.00
Bend PE - 100 DN 250 mm x 22.55' Las bh
Bend PE - 101 DN 250 mm x 45' Las bh 1,420,000.00
Bend PE - 102 DN 250 mm x 90' Las bh 1,695,000.00
Bend All Socket PVC
Bend All Socket PVC DN 100 mm x 90' Rubber Ring Joint (RRJ) bh 248,000.00
Bend All Socket PVC DN 150 mm x 90' Rubber Ring Joint (RRJ) bh 500,000.00
Bend All Socket PVC DN 200 mm x 90' Rubber Ring Joint (RRJ) bh 920,000.00
Las Flange (steel)
Las Flange DN 50 mm Ø 2" Flang + Packing bh 56,500.00
Las Flange DN 75 mm Ø 3" Flang + Packing bh 66,700.00
Las Flange DN 100 mm Ø 4" Flang + Packing bh 84,500.00
Las Flange DN 150 mm Ø 6" Flang + Packing bh 139,900.00
Las Flange DN 200 mm Ø 8" Flang + Packing bh 208,000.00
Las Flange DN 250 mm Ø 10" Flang + Packing bh 314,000.00
Flange Spigot
Flange Spigot DN 150 mm Ø 6" CI/Cast Iron bh 344,500.00
Flange Spigot DN 200 mm Ø 8" CI/Cast Iron bh 508,500.00
Flange Spigot DN 250 mm Ø 10" CI/Cast Iron bh 803,000.00
Double Air Valve
Air Valve DN 250 mm Ø 10" single bh 735,000.00
Stub end
Stub end PE DN 100 mm Ø 4" bh 318,000.00
Stub end PE DN 150 mm Ø 6" bh 686,500.00
Stub end PE DN 200 mm Ø 8" bh 927,500.00
Stub end flange
Stub end flange DN 100 mm Ø 4" Stub end + flange las bh 380,500.00
Stub end flange DN 150 mm Ø 6" Stub end + flange las bh 613,000.00
Stub end flange DN 200 mm Ø 8" Stub end + flange las bh 1,086,500.00
Stub end flange DN 250 mm Ø 10" Stub end + flange las bh 1,542,500.00
Strainer
Strainer DN 100 mm Ø 4" bh
Strainer DN 150 mm Ø 6" bh
Strainer DN 200 mm Ø 8" bh
Strainer DN 250 mm Ø 10" bh
Wall pipe
Wall pipe all flange DN 100 mm Ø 4" bh 390,000.00
Wall pipe all flange DN 150 mm Ø 6" bh 650,000.00
Wall pipe all flange DN 200 mm Ø 8" bh 710,000.00
Wall pipe all flange DN 250 mm Ø 10" bh 850,000.00
Street box
Street box DN 100 mm Ø 4" bh 254,000.00
DOP PVC
Dop PVC DN 100 mm Ø 4" Rubber Ring Joint (RRJ) bh 132,800.00

HALAMAN 29 DARI 229 HALAMAN


HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Dop PVC DN 150 mm Ø 6" Rubber Ring Joint (RRJ) bh 254,000.00


Flange Steel
Flange Steel DN 150 mm Ø 6" bh
Flange Steel DN 200 mm Ø 8" bh
Flange Steel DN 250 mm Ø 10" bh
Meter Induk
Meter Induk DN 200 mm Ø 8" bh
Meter Induk DN 250 mm Ø 10" bh 11,150,000.00
Giboult Joint
Giboult Joint DN 200 mm Ø 8" bh 741,800.00
Giboult Joint DN 250 mm Ø 10" bh 1,028,400.00
VIII . BAHAN LANGIT - LANGIT
1 ACOUSTIC BOARD
Acoustic Board uk. 30 X 30 cm lbr 25,000.00
Acoustic Board uk. 30 X 60 cm lbr 35,000.00
Acoustic Board uk. 60 X 120 cm lbr 146,000.00
List Kayu Profil m' 7,900.00
2 SOFT BOARD-uk 4'X 8'
Gypsum board uk. 1,2 x 2,4 tebal 9 mm lbr 53,000.00
Gypsum board uk. 1,2 x 2,4 tebal 9 mm (Lapis allumunium foil) lbr 77,000.00
Lis gypsum 2 meter m' 19,500.00
Lis kayu 2/4 m' 4,600.00
3 HARD BOARD-uk: 4'X 8' lbr 68,000.00
GYPROC uk.120cmx240cmx9mm lbr 65,000.00
4 PLY WOOD
Teak wood
Teakwood uk. 90 X 210 cm tbl = 3 mm lbr 154,000.00
Teakwood uk. 120 X 240 cm tbl =3 mm lbr 180,000.00
Teakwood uk. 90 X 210 cm tbl =4 mm lbr 160,000.00
Teakwood uk. 90 X 210 cm tbl = 9 mm lbr 155,000.00
Teakwood uk. 90 X 210 cm tbl =12 mm lbr 185,000.00
Teakwood uk. 90 X 210 cm tbl =15 mm lbr 245,000.00
Teakwood uk. 90 X 210 cm tbl =18 mm lbr 290,000.00
Tripleks
Triplek 1.2 x 2.4 m tbl = 3 mm lbr 75,000.00
Triplek 1.2 x 2.4 m tbl = 4 mm lbr 85,000.00
Triplek 1.2 x 2.4 m tbl = 6 mm lbr 110,000.00
Triplek 1.2 x 2.4 m tbl = 9 mm lbr 145,000.00
Triplek 0.9 x 2.1 m uk pintu tbl 4 mm lbr 85,000.00
Triplek 0.9 x 2.1 m uk pintu tbl 3 mm lbr 50,000.00
Phenol film 12 mm lbr 150,000.00
Multipleks
Multipleks uk.120 X 240 cm tbl= 9 mm lbr 130,000.00
Multipleks uk.120 X 240 tbl= 12 mm lbr 160,000.00
Multipleks uk.120 X 240 tbl= 15 mm lbr 200,000.00
Multipleks uk.120 X 240 tbl= 18 mm lbr 240,000.00
Formika (pelapis tripleks) ukuran pintu lbr 56,000.00

HALAMAN 30 DARI 229 HALAMAN


HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Eternit (GRC) 1mx1m2 tebal 4mm m2 19,000.00


Eternit (safleks) 1mx1m2 tebal 5mm m2 17,000.00
IX . BAHAN FINISHING
1 CAT KAYU
Menie kayu kg 35,000.00
Dempul/plamur kayu kg 25,000.00
Ambril/amplas lbr 5,000.00
Batu Apung kg 27,000.00
Cat dasar kayu kg 35,000.00
Cat kayu kg 55,000.00
Cat kayu ex. Emco kg 61,000.00
Cat kayu ex. Yunior 66 (nippon paint) kg 62,000.00
Cat kayu ex. Deculux kg 10,000.00
Cat genteng ex. Aviant paint 4 kg 125,000.00
Cat genteng ex. Dulux Wathershiekd roof paint 2.5 lt 185,000.00
cat genteng ex. Jootun jotaroof 2.5 lt 165,000.00
Koas/ kuas bh 63,000.00
Sirlak (bahan politur) ons 32,000.00
Spiritus ltr 16,000.00
Politur jadi ltr 42,000.00
2 CAT TEMBOK
Kalkarium kg 7,000.00
Kapur sirih kg 5,400.00
Plamur tembok kg 36,000.00
Cat tembok (dasar) kg 25,000.00
Cat Tembok kg 25,000.00
Cat Tembok ex. Sintex 5 kg 110,000.00
Cat Tembok ex. Danabride 5 kg 115,000.00
Cat Tembok ex. Catylac (interior) 5 kg 120,000.00
Cat Tembok ex. Catylac (exterior) 5 kg 230,000.00
Cat Tembok ex. Mowilex 2,50 kg 280,000.00
Cat Tembok ex. Jotun (interior) 5 kg 350,000.00
Cat Tembok ex. Jotun (exterior) 5 kg 400,000.00
Cat Tembok ex. Dulux (interior) 2.5 kg 215,000.00
Cat Tembok ex. Dulux (exterior) 2.5 kg 295,000.00
Cat waterproofing ex. No drop 1 kg 82,000.00
Cat waterproofing ex. No aquaproof 1kg 90,000.00
Cat waterproofing ex. Dulux aquashield 1kg 112,000.00
3 CAT BESI
Menie besi kg 26,000.00
Cat besi mengkilat kg 60,000.00
Cat kg 32,000.00
Thinner A ltr 27,000.00
Minyak cat ltr 20,000.00
Thinner Super ltr 18,000.00
Residu (teer/aspal) ltr 3,600.00
Vernis kg 54,000.00
Vernis batu alam kg 62,000.00
Lem Aica Aibon/ lem kuning kg 35,000.00

HALAMAN 31 DARI 229 HALAMAN


HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Minyak Beton & bekisting ltr 10,000.00


Minyak aspal/ Kerosen / Minyak Tanah ltr 9,650.00
Air ltr 50.00
Air m3 50,000.00
Sealent tube 60,000.00
Soda api kg 13,000.00
Sabun kg 13,000.00
wallpaper m' 25,000.00
HPL putih lbr 115,000.00
HPS polos lbr 130,000.00
HPL motif/tekture lbr 235,000.00
X. BAHAN KACA
1 Kaca polos/ bening tebal 3 mm m2 125,000.00
Kaca polos/ bening tebal 5 mm m2 150,000.00
2 Kaca Es/ Buram tebal 3 mm m2 85,000.00
Kaca Es/ Buram tebal 5 mm m2 95,000.00
3 Kaca ray band 3mm m2 140,000.00
Kaca ray band 5mm m2 165,000.00
Cermin tebal 5 mm m2 275,000.00
Kaca tempered flat tebal 8 mm m2 450,000.00
Kaca tempered flat tebal 10 mm m2 510,000.00
Kaca tempered flat tebal 12 mm m2 585,000.00
kaca patri m2 150,000.00
Profil kaca m' 6,500.00

HALAMAN 32 DARI 229 HALAMAN


HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

XI . BAHAN INSTALASI LISTRIK


1 KABEL LISTRIK
NYA : 1 X 1 1/2 mm2 m' 3,300.00
SPLN LMK 1 X 2 1/2 mm2 m' 3,800.00
. 1X4 mm2 m' 6,000.00
1X6 mm2 m' 8,600.00
NYY : 2 X 1 1/2 mm2 m' 9,000.00
PRIMA 2 X 2 1/2 mm2 m' 15,500.00
. 2X4 mm2 m' 27,500.00
2X6 mm2 m' 36,000.00
3 X 1 1/2 mm2 m' 13,500.00
3 X 2 1/2 mm2 m' 21,000.00
3X4 mm2 m' 36,000.00
3X6 mm2 m' 51,000.00
NYM : 2 X 1 1/2 mm2 m' 7,500.00
PRIMA 2 X 2 1/2 mm2 m' 11,000.00
. 2X4 mm2 m' 23,000.00
3 X 1 1/2 mm2 m' 14,000.00
3 X 2 1/2 mm2 m' 22,000.00
3X4 mm2 m' 32,000.00
3X6 mm2 m' 45,000.00
2 SAKLAR
Out bauw . Seri (double) ex. Panasonic bh 25,000.00
. Engkel (tunggal) ex. Panasonic bh 15,000.00
In bauw . Seri (double) ex. Panasonic bh 21,000.00
. Engkel (tunggal) ex. Panasonic bh 18,000.00
3 FUSE BOX (SEKERING KASA)
1 group bh 130,000.00
2 group bh 230,000.00
3 group bh 320,000.00
4 STEKER -
Biasa bh 10,000.00
Arde bh 15,000.00
T Biasa bh 12,500.00
T dengan Arde bh 17,000.00
5 FITING
Flaon bh 15,000.00
Gantung bh 17,500.00
Kap bh 19,250.00
Kombinasi bh 20,000.00
6 STOP KONTAK
Arde Outbow putih bh 12,500.00
Arde Outbow hitam bh 5,000.00
Arde Inbouw bh 20,000.00
Arde Putar bh 35,000.00
7 LAIN - LAIN
Outlet TV ex. Broco bh 35,000.00
Outlet Telephone ex. Broco bh 50,000.00
Down light / PLC 13 watt ex. Philips bh 33,000.00

HALAMAN 33 DARI 229 HALAMAN


HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Fitting Plafond ex. Panasonic bh 10,000.00


RM 2x TL LED 18 watt ex. Philips bh 270,000.00
RM 2x TL LED 36 watt ex. Philips bh 370,000.00
XII . ALAT-ALAT PENGUNCI & PENGGANTUNG
1 KUNCI TANAM
Union : 1 X slag bh 55,000.00
2 X slag bh 70,000.00
Yale : 1 X slag bh 85,000.00
2 X slag bh 130,000.00

HALAMAN 34 DARI 229 HALAMAN


HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Kuda : 1 X slag bh 60,000.00


2 X slag bh 70,000.00
2 ENGSEL DAN GERENDEL
Engsel Angin bh 16,000.00
Engsel Kupu-kupu biasa bh 2,500.00
Engsel Jendela Kuning bh 8,500.00
Engsel Pintu Kuning bh 25,000.00
Engsel Pintu biasa bh 25,000.00
kunci selot bh 20,000.00
Kunci silinder bh 75,000.00
Nylon kupu-kupu bh 9,000.00
Espagnolet - dalam negeri bh 32,000.00
Grendel Tanam luar negeri bh 8,250.00
Grendel biasa bh 10,000.00
Gerendel jendela kuning bh 7,000.00
Gerendel jendela biasa bh 6,000.00
Kait Angin bh 15,000.00
Door Stop bh 150,000.00
Door Closer bh 195,000.00
2 Sliding Pintu bh 235,000.00
3 Naco per Daun bh 41,000.00
4 Rolling door Besi m2 325,000.00
Rolling door Almunium m2 275,000.00
5 Awning Almunium m2 225,000.00
Pintu Lipat Besi m2 425,000.00
Sunscreen Allumunim m2 350,000.00
11 PAGAR BRC. 90 A2 /lb 280,000.00
PAGAR BRC. 120 A2 /lb 350,000.00
Allumunium Foil m2 8,000.00
Handle Pintu stainless 500 mm bh 375,000.00
Patch fitting 1 set 1,500,000.00
rambuncis bh 40,000.00
engsel casement 8" bh 30,000.00
engsel casement 10" bh 34,000.00
engsel casement 12" bh 45,000.00
engsel casement 16" bh 55,000.00
XIII . BAHAN SANITAIR
1 KLOSET DUDUK bh 1,450,000.00
2 KLOSET JONGKOK bh 155,000.00
3 WASTAFEL PEDESTAL bh 1,250,000.00
4 WASTAFEL MEJA OVAL bh 950,000.00
5 WASTAFEL GANTUNG BULAT bh 450,000.00
6 WASTAFEL GANTUNG SUDUT bh 310,000.00
7 WASTAFEL GANTUNG SUDUT KECIL bh 275,000.00
8 WASTAFEL BAK CUCI bh 160,000.00
Bak cuci stainless steel (1,00 x 0,90) m2 bh 150,000.00
Bak mandi fiber glass, vol 120 ltr sudut bh 180,000.00
9 TEMPAT SABUN GANTUNG bh 35,000.00
10 TEMPAT SABUN TANAM bh 45,000.00

HALAMAN 35 DARI 229 HALAMAN


HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Kran Air 1/2" bh 22,000.00


Kran Air 3/4" bh 18,000.00
Seal tape bh 7,000.00
Floor drain bh 25,000.00
urionir bh -
Bak tandon air fiber isi 500 Ltr bh 1,000,000.00
Bak tandon air fiber isi 1000 Ltr bh 1,700,000.00
XIV . ALAT PENGIKAT KAYU
1 PAKU - (reng, usuk, plafond) kg 21,000.00
2 PAKU - payung kg 20,000.00
3 PAKU - sekrup kg 15,000.00
4 PAKU - beton kg 21,000.00
PAKU - asbes kg 20,000.00
PAKU - 12 cm kg 18,000.00
PAKU - eternit kg 25,000.00
5 MUR BAUT (kuda-kuda) kg 15,000.00

HALAMAN 36 DARI 229 HALAMAN


HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

6 ANGKUR BAUT bh 13,500.00


7 LEM KAYU kg 20,000.00
Lem khusus wallpapaer kg 30,000.00
8 Tali Ijuk kg 6,250.00
Ijuk kg 10,000.00
Skrup Fixer bh 800.00
Dinabolt Ø 12 mm (10 s/d 15 cm) bh 8,000.00
XV . POMPA AIR
1 POMPA AIR TANGAN
Dragon buatan Indonesia bh 350,000.00
2 POMPA AIR LISTRIK
Sanyo 100 watt bh 1,050,000.00
Fuji 250 watt bh 1,500,000.00
Shimizu . 100 watt bh 510,000.00
. 90 watt bh 380,000.00
Dab . 125 watt bh 400,000.00
. 175 watt bh 450,000.00
XVI. LAIN -LAIN
Venetions Blinds atau Vertical Blinds (tirai) m2 50,000.00
ASPAL
Aspal curah kg 11,220.00
Aspal drum kg 12,320.00
Sand Sheet AMP ton 1,688,864.00
Kayu bakar m3 220,000.00
Alat Bantu Ls 2,000.00
Alat Bantu (BPJK) set 50,000.00
Solar (Industri) ltr 10,500.00
Premium (Industri) ltr 7,800.00
Pelumas ltr 30,000.00
Beton K-125 produk ready mix m3 900,625.00
Beton K-175 produk ready mix m3 925,375.00
Beton K-250 produk ready mix m3 996,875.00
Beton K-300 produk ready mix m3 1,032,625.00
Beton K-350 produk ready mix m3 1,082,125.00
Beton fs 45 produk Ready Mix m3 1,149,500.00
Joint Sealent Kg 68,750.00
Polytene (plastik cor) Kg 30,000.00
Curing Compound Ltr 38,500.00
Epoxy Bahan Penutup (sealant) Kg 68,750.00
U-DITCH
U 300 x 300 x 1200 mm, K. 350 Tbl. 5 CM Unit 450,000.00
U 300 x 400 x 1200 mm, K. 350 Tbl. 5 CM Unit 510,000.00
U 300 x 500 x 1200 mm, K. 350 Tbl. 5 CM Unit 580,000.00
Cover LC 400 x 1200 mm, K. 350 Tbl. 10 CM Unit 300,000.00
Cover HD 400 x 1200 mm, K. 350 Tbl. 15 CM Unit 400,000.00
U 400 x 400 x 1200 mm , K. 350 Tbl. 5 CM Unit 540,000.00
U 400 x 500 x 1200 mm , K. 350 Tbl. 5 CM Unit 610,000.00
U 400 x 600 x 1200 mm , K. 350 Tbl. 5 CM Unit 670,000.00
Cover LC 500 x 1200 mm, K. 350 Tbl. 10 CM Unit 320,000.00

HALAMAN 37 DARI 229 HALAMAN


HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Cover HD 500 x 1200 mm, K. 350 Tbl. 15 CM Unit 440,000.00


U 500 x 500 x 1200 mm, K. 350 Tbl. 7 CM Unit 800,000.00
U 500 x 600 x 1200 mm, K. 350 Tbl. 7 CM Unit 880,000.00
U 500 x 700 x 1200 mm, K. 350 Tbl. 7 CM Unit 970,000.00
Cover LC 640 x 1200 mm, K. 350 Tbl. 10 CM Unit 390,000.00
Cover HD 640 x 1200 mm, K. 350 Tbl. 15 CM Unit 550,000.00
U 600 x 600 x 1200 mm . K. 350 Tbl. 7 CM Unit 920,000.00
U 600 x 700 x 1200 mm . K. 350 Tbl. 7 CM Unit 1,010,000.00
U 600 x 800 x 1200 mm . K. 350 Tbl. 7 CM Unit 1,090,000.00
Cover LC 740 x 1200 mm, K. 350 Tbl. 10 CM Unit 440,000.00

HALAMAN 38 DARI 229 HALAMAN


HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

Cover HD 740 x 1200 mm, K. 350 Tbl. 15 CM Unit 620,000.00


U 800 x 800 x 1200 mm . K. 350 Tbl. 7 CM Unit 1,350,000.00
U 800 x 1000 x 1200 mm . K. 350 Tbl. 7 CM Unit 1,490,000.00
Cover LC 940 x 1200 mm, K. 350 Tbl. 10 CM Unit 550,000.00
Cover HD 940 x 1200 mm, K. 350 Tbl. 15 CM Unit 790,000.00
U 1000 x 1000 x 1200 mm . K. 350 Tbl. 10 CM Unit 2,110,000.00
Cover LC 940 x 1200 mm, K. 350 Tbl. 12 CM Unit 800,000.00
Cover HD 940 x 1200 mm, K. 350 Tbl. 15 CM Unit 980,000.00
U 1200 x 1200 x 1200 mm . K. 350 Tbl. 10 CM Unit 2,550,000.00
Cover LC 940 x 1200 mm, K. 350 Tbl. 12 CM Unit 920,000.00
Cover HD 940 x 1200 mm, K. 350 Tbl. 15 CM Unit 1,130,000.00
BOX CULVERT
Box Culvert 400 x 400 x 1200mm, K.350 Tbl. 8 cm Unit 1,080,000.00
Box Culvert 500 x 500 x 1200mm, K.350 Tbl. 8 cm Unit 1,330,000.00
Box Culvert 600 x 600 x 1200mm, K.350 Tbl. 8,5 cm Unit 1,480,000.00
Box Culvert 600 x 600 x 1200mm, K.350 Tbl. 16 cm Unit 2,900,000.00
Box Culvert 800 x 800 x 1200mm, K.350 Tbl. 10 cm Unit 2,750,000.00
Box Culvert 800 x 800 x 1200mm, K.350 Tbl. 15 cm Unit 3,650,000.00
Box Culvert 1000 x 1000 x 1200mm, K.350 Tbl. 12 cm Unit 3,700,000.00
Box Culvert 1200 x 1200 x 1200mm, K.350 Tbl. 14 cm Unit 5,200,000.00
Box Culvert 1200 x 1500 x 1500mm, K.350 Tbl. 17 cm Unit 6,900,000.00
Catatan :
- Mutu besi U-24 (polos), U-40 (ulir)
- Kondisi terkirim dilokasi proyek Kab. Tegal yang bisa dijangkau truck
- Harga belum termasuk penurunan dari tuck (penurunan oleh pihak pembeli/kontraktor)
- Harga tidak termasuk pemasangan
- Harga belum termasuk PPN 10%
Panel Beton Bertulang uk 240 x 40 x 5 cm Lbr 110,000.00
Panel Beton Bertulang uk 240 x 40 x 8 cm Lbr 165,000.00
Kolom Beton Bertulang uk 225 x 18 x 17 cm tebal 5 cm (Tinggi 1,6 m) Btg 245,500.00
Kolom Beton Bertulang uk 280 x 18 x 17 cm tebal 5 cm (Tinggi 2,0 m) Btg 298,600.00
Kolom Beton Bertulang uk 320 x 18 x 17 cm tebal 5 cm (Tinggi 2,4 m) Btg 336,600.00
Kolom Beton Bertulang uk 370 x 18 x 17 cm tebal 5 cm (Tinggi 2,8 m) Btg 384,000.00
Kolom Beton Bertulang uk 425 x 18 x 17 cm tebal 5 cm (Tinggi 3,2 m) Btg 436,200.00
Kolom Beton Bertulang uk 225 x 18 x 17 cm tebal 8 cm (Tinggi 1,6 m) Btg 267,500.00
Kolom Beton Bertulang uk 280 x 18 x 17 cm tebal 8 cm (Tinggi 2,0 m) Btg 320,600.00
Kolom Beton Bertulang uk 320 x 18 x 17 cm tebal 8 cm (Tinggi 2,4 m) Btg 358,600.00
Kolom Beton Bertulang uk 370 x 18 x 17 cm tebal 8 cm (Tinggi 2,8 m) Btg 406,000.00
Kolom Beton Bertulang uk 425 x 18 x 17 cm tebal 8 cm (Tinggi 3,2 m) Btg 458,200.00
Kawat Duri Siku 40 x 40 x 3 mm Tinggi 40 cm m' 74,250.00
Kawat Duri Siku 40 x 40 x 3 mm Tinggi 50 cm m' 81,200.00
Kawat Duri Siku 40 x 40 x 3 mm Tinggi 60 cm m' 96,075.00
ALUMUNIUM
ACP perpotated PVDF 4 mm (terpasanag) m2 850,000.00
ACP PVDF 4 mm polos (terpasang) m2 550,000.00
ACP PE 4 mm m2 450,000.00
ACP PE 3 mm m2 450,000.00
TANAMAN
Jenis peneduh

HALAMAN 39 DARI 229 HALAMAN


HARGA SATUAN
NO. JENIS BAHAN SAT
BAHAN (Rp.)

ketapang kencana (tinggi 1 m) bg 75,000.00


pohon pulai (tinggi 1 m) bg 750,000.00
bambu kuning (isi 3-5 btg) bg 60,000.00
pohon tabebula ungu (tinggi 30 cm) bg 30,000.00
Jenis Perdu
tanaman cincau hijau (tinggi 50 cm) bh 10,000.00
krokot merat bh 2,000.00
cemara laut (tinggi 50 cm) bh 15,000.00
rombusa mini hijau bh 8,500.00
sri gading kuning bh 5,500.00
pucuk merah (tinggi 30 cm) bh 17,500.00
rumput gajah mini bh 55,000.00
cendrawasih bh 11,000.00

Slawi, Desember 2019


Kepala Dinas Perumahan Rakyat, Kawasan Permukiman,
Tata Ruang dan Pertanahan Kabupaten Tegal

JAENAL DASMIN, BE, S.Sos, MM


NIP. 196510151989031008

HALAMAN 40 DARI 229 HALAMAN


ANALISIS HARGA SATUAN PEKERJAAN (AHSP)
BIDANG CIPTA KARYA BERDASARKAN PERMEN PUPR NO.28/PRT/M/2016

KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN : 2019

HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

I A. 2.2.1 K.3 HARGA SATUAN PEKERJAAN PERSIAPAN


1 A.2.2.1.2 1 m' Pagar Sementara dari Seng Gelombang Tinggi 2,00 m
A TENAGA 60,200.00
L.01 0.200 OH Pekerja 80,000.00 16,000.00
L.02 0.400 OH Tukang Kayu 100,000.00 40,000.00
L.03 0.020 OH Kepala Tukang 105,000.00 2,100.00
L.04 0.020 OH Mandor 105,000.00 2,100.00
B BAHAN 256,440.00
1.250 Btg Kayu Dolken diameter 8 - 10 / 400 cm 22,000.00 27,500.00
2.500 Kg Portalnd Semen 1,120.00 2,800.00
1.200 Lbr Seng Gelombang 3" - 5" 48,000.00 57,600.00
0.005 m3 Pasir Beton 345,000.00 1,725.00
0.009 m3 Koral Beton 295,000.00 2,655.00
0.072 m3 Kayu 5/7X4m Kayu Lokal 2,100,000.00 151,200.00
0.060 Kg Paku Biasa 2" - 5" 21,000.00 1,260.00
0.450 Kg Meni Besi 26,000.00 11,700.00
C PERALATAN -
D JUMLAH A + B + C 316,640.00
E OVERHEAD & PROFIT (contoh 15%) 15% 47,496.00
F HARGA SATUAN PEKERJAAN (D+E) 364,136.00
2 A.2.2.1.4 1 m' Pengukuran dan Pemasangan Bouwplank
A TENAGA 19,575.00
L.01 0.100 OH Pekerja 80,000.00 8,000.00
L.02 0.100 OH Tukang Kayu 100,000.00 10,000.00
L.03 0.010 OH Kepala Tukang 105,000.00 1,050.00
L.04 0.005 OH Mandor 105,000.00 525.00
B BAHAN 146,420.00
0.012 m3 Kayu 5/7x 4m Kayu Kruing 7,500,000.00 90,000.00
0.020 Kg Paku Biasa 2" - 5" 21,000.00 420.00
0.007 m3 Kayu Papan 3/20 Kruing 8,000,000.00 56,000.00
C PERALATAN -
D JUMLAH A + B + C 165,995.00
E OVERHEAD & PROFIT (contoh 15%) 15% 24,899.25
F HARGA SATUAN PEKERJAAN (D+E) 190,894.25
3 A.2.2.1.5 K.3 1 m2 Pembuatan Kantor Sementara dg Lantai Plesteran
A TENAGA 496,750.00
L.01 2.000 OH Pekerja 80,000.00 160,000.00
L.02 2.000 OH Tukang Kayu 100,000.00 200,000.00
L.02 1.000 OH Tukang Batu 100,000.00 100,000.00
L.03 0.300 OH Kepala Tukang 105,000.00 31,500.00

HALAMAN 41 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

L.04 0.050 OH Mandor 105,000.00 5,250.00


B BAHAN 680,750.00
1.250 Btg Kayu Dolken Ø 8 - 10 / 4 m 22,000.00 27,500.00
0.180 m3 Kayu lokal balok 2,100,000.00 378,000.00
0.800 Kg Paku Biasa 2" - 5" 21,000.00 16,800.00
1.100 Kg Besi Strip 15,000.00 16,500.00
35.000 Kg Portland Sement 1,120.00 39,200.00
0.150 m3 Pasir pasang 318,000.00 47,700.00
0.100 m3 Pasir Beton 345,000.00 34,500.00
0.150 m3 Koral Beton 295,000.00 44,250.00

HALAMAN 42 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

30.000 buah Batu bata Merah 1,150.00 34,500.00


0.250 Lbr Seng Plat 30,000.00 7,500.00
0.200 buah Jendela Naco 41,000.00 8,200.00
0.080 m2 Kaca Polos 150,000.00 12,000.00
0.150 buah Kunci Tanam 60,000.00 9,000.00
0.060 Lbr Plywood/ tripleks 4 mm 85,000.00 5,100.00
C PERALATAN -
D JUMLAH A + B + C 1,177,500.00
E OVERHEAD & PROFIT (contoh 15%) 15% 176,625.00
F HARGA SATUAN PEKERJAAN (D+E) 1,354,125.00
4 A.2.2.1.6 K.3 1 m2 Pembuatan Rumah Jaga (Konstruksi Kayu)
A TENAGA 251,000.00
L.01 1.000 OH Pekerja 80,000.00 80,000.00
L.02 1.500 OH Tukang Kayu 100,000.00 150,000.00
L.03 0.150 OH Kepala Tukang 105,000.00 15,750.00
L.04 0.050 OH Mandor 105,000.00 5,250.00
B BAHAN 532,800.00
3.000 Btg Kayu Dolken Ø 8 - 10 / 4 m 22,000.00 66,000.00
0.180 m3 Kayu lokal balok 2,100,000.00 378,000.00
0.800 Kg Paku Biasa 2" - 5" 21,000.00 16,800.00
1.500 Lbr Seng Gelombang 48,000.00 72,000.00
C PERALATAN -
D JUMLAH A + B + C 783,800.00
E OVERHEAD & PROFIT (contoh 15%) 15% 117,570.00
F HARGA SATUAN PEKERJAAN (D+E) 901,370.00
5 A.2.2.1.7 K.3 1 m2 Pembuatan Gudang Semen dan Peralatan
A TENAGA 306,250.00
L.01 1.000 OH Pekerja 80,000.00 80,000.00
L.02 2.000 OH Tukang Kayu 100,000.00 200,000.00
L.03 0.200 OH Kepala Tukang 105,000.00 21,000.00
L.04 0.050 OH Mandor 105,000.00 5,250.00
B BAHAN 601,060.00
1.700 Btg Kayu Dolken diameter 8 - 10 / 400 cm 22,000.00 37,400.00
0.210 m3 Kayu lokal balok 2,100,000.00 441,000.00
0.300 Kg Paku Biasa 2" - 5" 21,000.00 6,300.00
10.500 Kg Portland Semen 1,120.00 11,760.00
0.030 m3 Pasir Beton 345,000.00 10,350.00
0.050 m3 Koral Beton 295,000.00 14,750.00
1.500 Lbr Seng Gelombang 48,000.00 72,000.00
0.250 Lbr Seng Plat 30,000.00 7,500.00
C PERALATAN -
D JUMLAH A + B + C 907,310.00
E OVERHEAD & PROFIT (contoh 15%) 15% 136,096.50
F HARGA SATUAN PEKERJAAN (D+E) 1,043,406.50
6 A.2.2.1.8 K.3 1 m2 Pembuatan Bedeng Pekerja
A TENAGA 306,250.00
L.01 1.000 OH Pekerja 80,000.00 80,000.00
L.02 2.000 OH Tukang Kayu 100,000.00 200,000.00
L.03 0.200 OH Kepala Tukang 105,000.00 21,000.00

HALAMAN 43 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

L.04 0.050 OH Mandor 105,000.00 5,250.00


B BAHAN 656,410.00
1.250 Btg Kayu Dolken diameter 8 - 10 / 400 cm 22,000.00 27,500.00
0.186 m3 Kayu 2,100,000.00 390,600.00
0.300 Kg Paku Biasa 2" - 5" 21,000.00 6,300.00
18.000 Kg Portland Semen 1,120.00 20,160.00
0.030 m3 Pasir Beton 345,000.00 10,350.00
0.050 m3 Koral Beton 295,000.00 14,750.00
1.500 Lbr Seng Gelombang 48,000.00 72,000.00

HALAMAN 44 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

1.350 Lbr Plywood/ tripleks 4 mm 85,000.00 114,750.00


C PERALATAN -
D JUMLAH A + B + C 962,660.00
E OVERHEAD & PROFIT (contoh 15%) 15% 144,399.00
F HARGA SATUAN PEKERJAAN (D+E) 1,107,059.00
7 A.2.2.1.9 K.3 1 m2 Membersihkan Lapangan dan Perataan
A TENAGA 13,250.00
L.01 0.100 OH Pekerja 80,000.00 8,000.00
L.04 0.050 OH Mandor 105,000.00 5,250.00
B BAHAN -
C PERALATAN -
D JUMLAH A + B + C 13,250.00
E OVERHEAD & PROFIT (contoh 15%) 15% 1,987.50
F HARGA SATUAN PEKERJAAN (D+E) 15,237.50
8 A.2.2.1.10 K.3 1 m2 Pembuatan Steger/Perancah dari Bambu
A TENAGA 306,250.00
L.01 1.000 OH Pekerja 80,000.00 80,000.00
L.02 2.000 OH Tukang Kayu 100,000.00 200,000.00
L.03 0.200 OH Kepala Tukang 105,000.00 21,000.00
L.04 0.050 OH Mandor 105,000.00 5,250.00
B BAHAN 23,037.50
1.250 Btg Bambu diameter 6 - 8 / 600 cm 17,500.00 21,875.00
0.186 Kg Tali Ijuk 6,250.00 1,162.50
C PERALATAN -
D JUMLAH A + B + C 329,287.50
E OVERHEAD & PROFIT (contoh 15%) 15% 49,393.13
F HARGA SATUAN PEKERJAAN (D+E) 378,680.63
9 A.2.2.1.11 1 bh Pembuatan Kotak Adukan ukuran 40cmx50cmx25cm
A TENAGA 33,150.00
L.02 0.300 OH Tukang Kayu 100,000.00 30,000.00
L.03 0.030 OH Kepala Tukang 105,000.00 3,150.00
B BAHAN 129,480.00
0.036 m3 Kayu Papan lokal 1,450,000.00 52,200.00
0.036 m3 Kayu Balok lokal 2,100,000.00 75,600.00
0.080 kg Paku Biasa 21,000.00 1,680.00
C PERALATAN -
D JUMLAH A + B + C 162,630.00
E OVERHEAD & PROFIT (contoh 15%) 15% 24,394.50
F HARGA SATUAN PEKERJAAN (D+E) 187,024.50
10 A.2.2.1.12 1 m2 Pembuatan Jalan Sementara
A TENAGA 80,525.00
L.01 1.000 OH Pekerja 80,000.00 80,000.00
L.04 0.005 OH Mandor 105,000.00 525.00
B. BAHAN 91,170.00
0.150 m3 Batu Belah 332,800.00 49,920.00
0.090 m3 Batu Pecah 423,000.00 38,070.00
0.010 m3 Pasir Pasang 318,000.00 3,180.00
C PERALATAN -
D JUMLAH A + B + C 171,695.00

HALAMAN 45 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

E OVERHEAD & PROFIT (contoh 15%) 15% 25,754.25


F HARGA SATUAN PEKERJAAN (D+E) 197,449.25

HALAMAN 46 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

11 A.2.2.1.13 1 m3 Bongkaran Beton Bertulang


A TENAGA 1,136,650.00
L.01 13.334 OH Pekerja 80,000.00 1,066,720.00
L.04 0.666 OH Mandor 105,000.00 69,930.00
B BAHAN -
C PERALATAN -
D JUMLAH A + B + C 1,136,650.00
E OVERHEAD & PROFIT (contoh 15%) 15% 170,497.50
F HARGA SATUAN PEKERJAAN (D+E) 1,307,147.50
12 A.2.2.1.14 1 m3 Bongkaran Dinding Tembok Bata Merah
A TENAGA 536,825.00
L.01 6.667 OH Pekerja 80,000.00 533,360.00
L.04 0.033 OH Mandor 105,000.00 3,465.00
B BAHAN -
C PERALATAN -
D JUMLAH A + B + C 536,825.00
E OVERHEAD & PROFIT (contoh 15%) 15% 80,523.75
F HARGA SATUAN PEKERJAAN (D+E) 617,348.75
13 A.2.2.1.15 1 m2 Pagar Kawat Jaring Galvanis Panjang 240 cm
A TENAGA 8,380.00
L.01 0.042 OH Pekerja 80,000.00 3,360.00
L.02 0.004 OH Tukang Kayu 100,000.00 400.00
L.03 0.002 OH Kepala Tukang 105,000.00 210.00
L.04 0.042 OH Mandor 105,000.00 4,410.00
B BAHAN 40,152.00
0.143 Lbr Kawat Jaring 280,000.00 40,152.00
C PERALATAN -
D JUMLAH A + B + C 48,532.00
E OVERHEAD & PROFIT (contoh 15%) 15% 7,279.80
F HARGA SATUAN PEKERJAAN (D+E) 55,811.80
14 A.2.2.1.16 1 m2 Pemasangan Pagar Panel Beton Pracetak 5 x 50 x 240 cm
A TENAGA 45,755.00
L.01 0.375 OH Pekerja 80,000.00 30,000.00
L.02 0.125 OH Tukang Batu 100,000.00 12,500.00
L.03 0.012 OH Kepala Tukang 105,000.00 1,260.00
L.04 0.019 OH Mandor 105,000.00 1,995.00
B BAHAN 360,395.00
0.986 Lbr Panel Beton Pracetak 110,000.00 108,460.00
0.525 Btg Kolom Beton Pracetak 336,600.00 176,715.00
45.000 Kg Portlan Cement 1,120.00 50,400.00
0.146 m3 Koral 170,000.00 24,820.00
C PERALATAN -
D JUMLAH A + B + C 406,150.00
E OVERHEAD & PROFIT (contoh 15%) 15% 60,922.50
F HARGA SATUAN PEKERJAAN (D+E) 467,072.50
A.2.2.1.17 1 m3 Bongkaran Pasangan batu kali
A TENAGA 255,750.00
L.01 3.000 OH Pekerja 80,000.00 240,000.00
L.04 0.150 OH Mandor 105,000.00 15,750.00

HALAMAN 47 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

B BAHAN -
C PERALATAN -
D JUMLAH A + B + C 255,750.00
E OVERHEAD & PROFIT (contoh 15%) 15% 38,362.50
F HARGA SATUAN PEKERJAAN (D+E) 294,112.50

HALAMAN 48 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

A.2.2.1.18 1 m2 Bongkaran / Kupasan Plesteran


A TENAGA 6,625.00
L.01 0.050 OH Pekerja 80,000.00 4,000.00
L.04 0.025 OH Mandor 105,000.00 2,625.00
B BAHAN -
C PERALATAN -
D JUMLAH A + B + C 6,625.00
E OVERHEAD & PROFIT (contoh 15%) 15% 993.75
F HARGA SATUAN PEKERJAAN (D+E) 7,618.75
A.2.2.1.19 1 m2 Bongkaran Lantai
A TENAGA 5,050.00
L.01 0.050 OH Pekerja 80,000.00 4,000.00
L.04 0.010 OH Mandor 105,000.00 1,050.00
B BAHAN -
C PERALATAN -
D JUMLAH A + B + C 5,050.00
E OVERHEAD & PROFIT (contoh 15%) 15% 757.50
F HARGA SATUAN PEKERJAAN (D+E) 5,807.50
A.2.2.1.20 1 m2 Bongkaran Atap
A TENAGA 2,650.00
L.01 0.020 OH Pekerja 80,000.00 1,600.00
L.04 0.010 OH Mandor 105,000.00 1,050.00
B BAHAN -
C PERALATAN -
D JUMLAH A + B + C 2,650.00
E OVERHEAD & PROFIT (contoh 15%) 15% 397.50
F HARGA SATUAN PEKERJAAN (D+E) 3,047.50
A.2.2.1.21 1 m2 Bongkaran Rangka Atap (Reng, Usuk)
A TENAGA 12,787.50
L.01 0.025 OH Pekerja 80,000.00 2,000.00
0.100 OH Tukang Kayu 100,000.00 10,000.00
0.003 OH Kepala Tukang Kayu 105,000.00 262.50
L.04 0.005 OH Mandor 105,000.00 525.00
B BAHAN -
C PERALATAN -
D JUMLAH A + B + C 12,787.50
E OVERHEAD & PROFIT (contoh 15%) 15% 1,918.13
F HARGA SATUAN PEKERJAAN (D+E) 14,705.63
A.2.2.1.22 1 m3 Bongkaran Kusen Pintu dan Jendela
A TENAGA 90,787.50
L.01 1.000 OH Pekerja 80,000.00 80,000.00
0.100 OH Tukang Kayu 100,000.00 10,000.00
0.003 OH Kepala Tukang Kayu 105,000.00 262.50
L.04 0.005 OH Mandor 105,000.00 525.00
B BAHAN -
C PERALATAN -
D JUMLAH A + B + C 90,787.50
E OVERHEAD & PROFIT (contoh 15%) 15% 13,618.13
F HARGA SATUAN PEKERJAAN (D+E) 104,405.63

HALAMAN 49 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

II A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


1 A.2.3.1.1 1 m3 Menggali Tanah Biasa Sedalam 1 m
A TENAGA 62,625.00
L.01 0.750 OH Pekerja 80,000.00 60,000.00
L.04 0.025 OH Mandor 105,000.00 2,625.00
B BAHAN -
C PERALATAN -
D JUMLAH A + B + C 62,625.00
E OVERHEAD & PROFIT (contoh 15%) 15% 9,393.75
F HARGA SATUAN PEKERJAAN (D+E) 72,018.75

HALAMAN 50 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

2 A.2.3.1.2 1 m3 Menggali Tanah Biasa Sedalam 2 m


A TENAGA 76,725.00
L.01 0.900 OH Pekerja 80,000.00 72,000.00
L.04 0.045 OH Mandor 105,000.00 4,725.00
B BAHAN -
C PERALATAN -
D JUMLAH A + B + C 76,725.00
E OVERHEAD & PROFIT (contoh 15%) 15% 11,508.75
F HARGA SATUAN PEKERJAAN (D+E) 88,233.75
3 A.2.3.1.3 1 m3 Menggali Tanah Biasa Sedalam 3 m
A TENAGA 91,035.00
L.01 1.050 OH Pekerja 80,000.00 84,000.00
L.04 0.067 OH Mandor 105,000.00 7,035.00
B BAHAN -
C PERALATAN -
D JUMLAH A + B + C 91,035.00
E OVERHEAD & PROFIT (contoh 15%) 15% 13,655.25
F HARGA SATUAN PEKERJAAN (D+E) 104,690.25
4 A.2.3.1.4 1 m3 Menggali Tanah Keras Sedalam 1 m
A TENAGA 83,360.00
L.01 1.000 OH Pekerja 80,000.00 80,000.00
L.04 0.032 OH Mandor 105,000.00 3,360.00
B BAHAN -
C PERALATAN -
D JUMLAH A + B + C 83,360.00
E OVERHEAD & PROFIT (contoh 15%) 15% 12,504.00
F HARGA SATUAN PEKERJAAN (D+E) 95,864.00
5 A.2.3.1.5 1 m3 Menggali Tanah Cadas Sedalam 1 m
A TENAGA 126,300.00
L.01 1.500 OH Pekerja 80,000.00 120,000.00
L.04 0.060 OH Mandor 105,000.00 6,300.00
B BAHAN -
C PERALATAN -
D JUMLAH A + B + C 126,300.00
E OVERHEAD & PROFIT (contoh 15%) 15% 18,945.00
F HARGA SATUAN PEKERJAAN (D+E) 145,245.00
6 A.2.3.1.6 1 m3 Menggali Tanah Lumpur Sedalam 1 m
A TENAGA 100,725.00
L.01 1.200 OH Pekerja 80,000.00 96,000.00
L.04 0.045 OH Mandor 105,000.00 4,725.00
B BAHAN -
C PERALATAN -
D JUMLAH A + B + C 100,725.00
E OVERHEAD & PROFIT (contoh 15%) 15% 15,108.75
F HARGA SATUAN PEKERJAAN (D+E) 115,833.75
7 A.2.3.1.7 1 m2 Mengerjakan Striping Tebing Setinggi 1 m
A TENAGA 4,525.00
L.01 0.050 OH Pekerja 80,000.00 4,000.00
L.04 0.005 OH Mandor 105,000.00 525.00

HALAMAN 51 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

B BAHAN -
C PERALATAN -
D JUMLAH A + B + C 4,525.00
E OVERHEAD & PROFIT (contoh 15%) 15% 678.75
F HARGA SATUAN PEKERJAAN (D+E) 5,203.75

HALAMAN 52 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

8 A.2.3.1.8 1 m3 MembuangTanah sejauh 30 m'


A TENAGA 27,450.00
L.01 0.330 OH Pekerja 80,000.00 26,400.00
L.04 0.010 OH Mandor 105,000.00 1,050.00
B BAHAN -
C PERALATAN -
D JUMLAH A + B + C 27,450.00
E OVERHEAD & PROFIT (contoh 15%) 15% 4,117.50
F HARGA SATUAN PEKERJAAN (D+E) 31,567.50
9 A.2.3.1.9 1 m3 Pengurugan Kembali
A TENAGA 45,250.00
L.01 0.500 OH Pekerja 80,000.00 40,000.00
L.04 0.050 OH Mandor 105,000.00 5,250.00
B BAHAN -
C PERALATAN -
D JUMLAH A + B + C 45,250.00
E OVERHEAD & PROFIT (contoh 15%) 15% 6,787.50
F HARGA SATUAN PEKERJAAN (D+E) 52,037.50
9 A.2.3.1.9a 1 m3 Pengurugan Kembali
di hitung dari 1/3 kali koefisien Pekerjaan galian
A TENAGA 45,250.00
L.01 0.500 OH Pekerja 80,000.00 40,000.00
L.04 0.050 OH Mandor 105,000.00 5,250.00
B BAHAN -
C PERALATAN -
D JUMLAH A + B + C 45,250.00
E OVERHEAD & PROFIT (contoh 15%) 15% 6,787.50
F HARGA SATUAN PEKERJAAN (D+E) 52,037.50
10 A.2.3.1.10 1 m3 Pemadatan Tanah (per 20 cm)
A TENAGA 45,250.00
L.01 0.500 OH Pekerja 80,000.00 40,000.00
L.04 0.050 OH Mandor 105,000.00 5,250.00
B BAHAN -
C PERALATAN -
D JUMLAH A + B + C 45,250.00
E OVERHEAD & PROFIT (contoh 15%) 15% 6,787.50
F HARGA SATUAN PEKERJAAN (D+E) 52,037.50
11 A.2.3.1.11 1 m3 Urugan Pasir
A TENAGA 25,050.00
L.01 0.300 OH Pekerja 80,000.00 24,000.00
L.04 0.010 OH Mandor 105,000.00 1,050.00
B BAHAN 236,400.00
1.200 m3 Pasir Urug 197,000.00 236,400.00
C PERALATAN -
D JUMLAH A + B + C 261,450.00
E OVERHEAD & PROFIT (contoh 15%) 15% 39,217.50
F HARGA SATUAN PEKERJAAN (D+E) 300,667.50
A.2.3.1.11a 1 m3 Urugan Tanah Dipadatkan Menggunakan Alat
A TENAGA 25,050.00

HALAMAN 53 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

L.01 0.300 OH Pekerja 80,000.00 24,000.00


L.04 0.010 OH Mandor 105,000.00 1,050.00
B BAHAN 96,000.00
1.200 m3 Tanah Urug 80,000.00 96,000.00
C PERALATAN 6,384.01
0.009 jam Water tanker 3000 - 4500 Ltr 328,432.18 2,793.19
0.004 jam BULLDOZER 100-150 HP 536,822.37 2,130.25

HALAMAN 54 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)
0.004 jam Vibratory Roller 5 - 8 T 349,419.78 1,460.57
D JUMLAH A + B + C 127,434.01
E OVERHEAD & PROFIT (contoh 15%) 15% 19,115.10
F HARGA SATUAN PEKERJAAN (D+E) 146,549.11
12 A.2.3.1.12 1 m3 Lapisan Pudel Cmp. 1Kp : 3Ps : 7TL
A TENAGA 116,600.00
L.01 0.800 OH Pekerja 80,000.00 64,000.00
L.02 0.400 OH Tukang Batu 100,000.00 40,000.00
L.03 0.040 OH Kepala Tukang 105,000.00 4,200.00
L.04 0.080 OH Mandor 105,000.00 8,400.00
B BAHAN 189,290.00
0.135 m3 Pasir Pasang 318,000.00 42,930.00
0.400 m3 Kapur Padam 200,000.00 80,000.00
0.948 m3 Tanah Liat 70,000.00 66,360.00
C PERALATAN -
D JUMLAH A + B + C 305,890.00
E OVERHEAD & PROFIT (contoh 15%) 15% 45,883.50
F HARGA SATUAN PEKERJAAN (D+E) 351,773.50
13 A.2.3.1.13 1 m2 Pemasangan Lapisan Ijuk tebal 10 cm untuk Bidang Resapan
A TENAGA 13,575.00
0.150 OH Pekerja 80,000.00 12,000.00
0.015 OH Mandor 105,000.00 1,575.00
B BAHAN 60,000.00
6.000 kg Ijuk 10,000.00 60,000.00
C PERALATAN -
D JUMLAH A + B + C 73,575.00
E OVERHEAD & PROFIT (contoh 15%) 15% 11,036.25
F HARGA SATUAN PEKERJAAN (D+E) 84,611.25
14 A.2.3.1.14 1 m3 Mengurug Sirtu
A TENAGA 22,625.00
0.250 OH Pekerja 80,000.00 20,000.00
0.025 OH Mandor 105,000.00 2,625.00
B BAHAN 201,000.00
1.200 m3 Sirtu 167,500.00 201,000.00
C PERALATAN -
D JUMLAH A + B + C 223,625.00
E OVERHEAD & PROFIT (contoh 15%) 15% 33,543.75
F HARGA SATUAN PEKERJAAN (D+E) 257,168.75
A.2.3.1.14a 1 m3 Mengurug Sirtu Dipadatkan
A TENAGA 22,625.00
0.250 OH Pekerja 80,000.00 20,000.00
0.025 OH Mandor 105,000.00 2,625.00
B BAHAN 201,000.00
1.200 m3 Sirtu 167,500.00 201,000.00
C PERALATAN 6,384.01
0.009 jam Water tanker 3000 - 4500 Ltr 328,432.18 2,793.19
0.004 jam BULLDOZER 100-150 HP 536,822.37 2,130.25
0.004 jam Vibratory Roller 5 - 8 T 349,419.78 1,460.57
D JUMLAH A + B + C 230,009.01

HALAMAN 55 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

E OVERHEAD & PROFIT (contoh 15%) 15% 34,501.35


F HARGA SATUAN PEKERJAAN (D+E) 264,510.36
III A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI
1 A.3.2.1.1 1 m3 Pemasangan Pondasi Batu Belah 1SP : 3 PP
A TENAGA 210,750.00
L.01 1.500 OH Pekerja 80,000.00 120,000.00
L.02 0.750 OH Tukang Batu 100,000.00 75,000.00
L.03 0.075 OH Kepala Tukang 105,000.00 7,875.00
L.04 0.075 OH Mandor 105,000.00 7,875.00

HALAMAN 56 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

B BAHAN 779,830.00
1.200 m3 Batu Belah 15/20 332,800.00 399,360.00
202.000 Kg Portland Sement 1,120.00 226,240.00
0.485 m3 Pasir Pasang 318,000.00 154,230.00
C PERALATAN -
D JUMLAH A + B + C 990,580.00
E OVERHEAD & PROFIT (contoh 15%) 15% 148,587.00
F HARGA SATUAN PEKERJAAN (D+E) 1,139,167.00
1 A.3.2.1.1a 1 m3 Pemasangan Pondasi Batu Belah 1SP : 3 PP (Batu belah 60%,Blonos 40%)
A TENAGA 210,750.00
L.01 1.500 OH Pekerja 80,000.00 120,000.00
L.02 0.750 OH Tukang Batu 100,000.00 75,000.00
L.03 0.075 OH Kepala Tukang 105,000.00 7,875.00
L.04 0.075 OH Mandor 105,000.00 7,875.00
B BAHAN 759,670.00
0.720 m3 Batu Belah 15/20 332,800.00 239,616.00
0.480 m3 Batu Blonos 290,800.00 139,584.00
202.000 Kg Portland Sement 1,120.00 226,240.00
0.485 m3 Pasir Pasang 318,000.00 154,230.00
C PERALATAN -
D JUMLAH A + B + C 970,420.00
E OVERHEAD & PROFIT (contoh 15%) 15% 145,563.00
F HARGA SATUAN PEKERJAAN (D+E) 1,115,983.00
2 A.3.2.1.2 1 m3 Pemasangan Pondasi Batu Belah 1SP : 4 PP
A TENAGA 210,750.00
L.01 1.500 OH Pekerja 80,000.00 120,000.00
L.02 0.750 OH Tukang Batu 100,000.00 75,000.00
L.03 0.075 OH Kepala Tukang 105,000.00 7,875.00
L.04 0.075 OH Mandor 105,000.00 7,875.00
B BAHAN 747,280.00
1.200 m3 Batu Belah 15/20 332,800.00 399,360.00
163.000 Kg Portland Sement 1,120.00 182,560.00
0.520 m3 Pasir Pasang 318,000.00 165,360.00
C PERALATAN -
D JUMLAH A + B + C 958,030.00
E OVERHEAD & PROFIT (contoh 15%) 15% 143,704.50
F HARGA SATUAN PEKERJAAN (D+E) 1,101,734.50
2 A.3.2.1.2a 1 m3 Pemasangan Pondasi Batu Belah 1SP : 3 PP (Batu belah 60%,Blonos 40%)
A TENAGA 210,750.00
L.01 1.500 OH Pekerja 80,000.00 120,000.00
L.02 0.750 OH Tukang Batu 100,000.00 75,000.00
L.03 0.075 OH Kepala Tukang 105,000.00 7,875.00
L.04 0.075 OH Mandor 105,000.00 7,875.00
B BAHAN 727,120.00
0.720 m3 Batu Belah 15/20 332,800.00 239,616.00
0.480 m3 Batu Blonos 290,800.00 139,584.00
163.000 Kg Portland Sement 1,120.00 182,560.00
0.520 m3 Pasir Pasang 318,000.00 165,360.00
C PERALATAN -

HALAMAN 57 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

D JUMLAH A + B + C 937,870.00
E OVERHEAD & PROFIT (contoh 15%) 15% 140,680.50
F HARGA SATUAN PEKERJAAN (D+E) 1,078,550.50
3 A.3.2.1.3 1 m3 Pemasangan Pondasi Batu Belah 1SP : 5 PP
A TENAGA 210,750.00
L.01 1.500 OH Pekerja 80,000.00 120,000.00
L.02 0.750 OH Tukang Batu 100,000.00 75,000.00
L.03 0.075 OH Kepala Tukang 105,000.00 7,875.00
L.04 0.075 OH Mandor 105,000.00 7,875.00

HALAMAN 58 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

B BAHAN 724,672.00
1.200 m3 Batu Belah 15/20 332,800.00 399,360.00
136.000 Kg Portland Sement 1,120.00 152,320.00
0.544 m3 Pasir Pasang 318,000.00 172,992.00
C PERALATAN -
D JUMLAH A + B + C 935,422.00
E OVERHEAD & PROFIT (contoh 15%) 15% 140,313.30
F HARGA SATUAN PEKERJAAN (D+E) 1,075,735.30
3 A.3.2.1.3a 1 m3 Pemasangan Pondasi Batu Belah 1SP : 5 PP (Batu belah 60%,Blonos 40%)
A TENAGA 210,750.00
L.01 1.500 OH Pekerja 80,000.00 120,000.00
L.02 0.750 OH Tukang Batu 100,000.00 75,000.00
L.03 0.075 OH Kepala Tukang 105,000.00 7,875.00
L.04 0.075 OH Mandor 105,000.00 7,875.00
B BAHAN 704,512.00
0.720 m3 Batu Belah 15/20 332,800.00 239,616.00
0.480 m3 Batu Blonos 290,800.00 139,584.00
136.000 Kg Portland Sement 1,120.00 152,320.00
0.544 m3 Pasir Pasang 318,000.00 172,992.00
C PERALATAN -
D JUMLAH A + B + C 915,262.00
E OVERHEAD & PROFIT (contoh 15%) 15% 137,289.30
F HARGA SATUAN PEKERJAAN (D+E) 1,052,551.30
4 A.3.2.1.4 1 m3 Pemasangan Pondasi Batu Belah 1SP : 6 PP
A TENAGA 210,750.00
L.01 1.500 OH Pekerja 80,000.00 120,000.00
L.02 0.750 OH Tukang Batu 100,000.00 75,000.00
L.03 0.075 OH Kepala Tukang 105,000.00 7,875.00
L.04 0.075 OH Mandor 105,000.00 7,875.00
B BAHAN 708,798.00
1.200 m3 Batu Belah 15/20 332,800.00 399,360.00
117.000 Kg Portland Sement 1,120.00 131,040.00
0.561 m3 Pasir Pasang 318,000.00 178,398.00
C PERALATAN -
D JUMLAH A + B + C 919,548.00
E OVERHEAD & PROFIT (contoh 15%) 15% 137,932.20
F HARGA SATUAN PEKERJAAN (D+E) 1,057,480.20
4 A.3.2.1.4a 1 m3 Pemasangan Pondasi Batu Belah 1SP : 6 PP (Batu belah 60%,Blonos 40%)
A TENAGA 210,750.00
L.01 1.500 OH Pekerja 80,000.00 120,000.00
L.02 0.750 OH Tukang Batu 100,000.00 75,000.00
L.03 0.075 OH Kepala Tukang 105,000.00 7,875.00
L.04 0.075 OH Mandor 105,000.00 7,875.00
B BAHAN 688,638.00
0.720 m3 Batu Belah 15/20 332,800.00 239,616.00
0.480 m3 Batu Blonos 290,800.00 139,584.00
117.000 Kg Portland Sement 1,120.00 131,040.00
0.561 m3 Pasir Pasang 318,000.00 178,398.00
C PERALATAN -

HALAMAN 59 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

D JUMLAH A + B + C 899,388.00
E OVERHEAD & PROFIT (contoh 15%) 15% 134,908.20
F HARGA SATUAN PEKERJAAN (D+E) 1,034,296.20
5 A.3.2.1.5 1 m3 Pemasangan Pondasi Batu Belah 1SP : 8 PP
A TENAGA 210,750.00
L.01 1.500 OH Pekerja 80,000.00 120,000.00
L.02 0.750 OH Tukang Batu 100,000.00 75,000.00
L.03 0.075 OH Kepala Tukang 105,000.00 7,875.00
L.04 0.075 OH Mandor 105,000.00 7,875.00

HALAMAN 60 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

B BAHAN 686,992.00
1.200 m3 Batu Belah 15/20 332,800.00 399,360.00
91.000 Kg Portland Sement 1,120.00 101,920.00
0.584 m3 Pasir Pasang 318,000.00 185,712.00
C PERALATAN -
D JUMLAH A + B + C 897,742.00
E OVERHEAD & PROFIT (contoh 15%) 15% 134,661.30
F HARGA SATUAN PEKERJAAN (D+E) 1,032,403.30
5 A.3.2.1.5a 1 m3 Pemasangan Pondasi Batu Belah 1SP : 8 PP (Batu belah 60%,Blonos 40%)
A TENAGA 210,750.00
L.01 1.500 OH Pekerja 80,000.00 120,000.00
L.02 0.750 OH Tukang Batu 100,000.00 75,000.00
L.03 0.075 OH Kepala Tukang 105,000.00 7,875.00
L.04 0.075 OH Mandor 105,000.00 7,875.00
B BAHAN 666,832.00
0.720 m3 Batu Belah 15/20 332,800.00 239,616.00
0.480 m3 Batu Blonos 290,800.00 139,584.00
91.000 Kg Portland Sement 1,120.00 101,920.00
0.584 m3 Pasir Pasang 318,000.00 185,712.00
C PERALATAN -
D JUMLAH A + B + C 877,582.00
E OVERHEAD & PROFIT (contoh 15%) 15% 131,637.30
F HARGA SATUAN PEKERJAAN (D+E) 1,009,219.30
6 A.3.2.1.6 1 m3 Pemasangan Pondasi Batu Belah 1SP : 1KP : 2PP
A TENAGA 210,750.00
L.01 1.500 OH Pekerja 80,000.00 120,000.00
L.02 0.750 OH Tukang Batu 100,000.00 75,000.00
L.03 0.075 OH Kepala Tukang 105,000.00 7,875.00
L.04 0.075 OH Mandor 105,000.00 7,875.00
B BAHAN 541,670.40
1.200 m3 Batu Belah 15/20 332,800.00 399,360.00
0.170 m3 Kapur Pasang (KP) 200,000.00 34,000.00
0.170 Kg Portland cement 1,120.00 190.40
0.340 m3 Pasir Pasang 318,000.00 108,120.00
C PERALATAN -
D JUMLAH A + B + C 752,420.40
E OVERHEAD & PROFIT (contoh 15%) 15% 112,863.06
F HARGA SATUAN PEKERJAAN (D+E) 865,283.46
7 A.3.2.1.7 1 m3 Pemasangan Pondasi Batu Belah, 1 SP : 3 KP : 10 PP
A TENAGA 210,750.00
L.01 1.500 OH Pekerja 80,000.00 120,000.00
L.02 0.750 OH Tukang Batu 100,000.00 75,000.00
L.03 0.075 OH Kepala Tukang 105,000.00 7,875.00
L.04 0.075 OH Mandor 105,000.00 7,875.00
B BAHAN 653,536.00
1.200 m3 Batu Belah 15/20 332,800.00 399,360.00
61.000 kg Portland Sement 1,120.00 68,320.00
0.147 m3 Kapur Pasang 200,000.00 29,400.00
0.492 m3 Pasir Pasang 318,000.00 156,456.00

HALAMAN 61 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

C PERALATAN -
D JUMLAH A + B + C 864,286.00
E OVERHEAD & PROFIT (contoh 15%) 15% 129,642.90
F HARGA SATUAN PEKERJAAN (D+E) 993,928.90
8 A.3.2.1.8 1 m3 Pemasangan Pondasi Batu Belah, ¼ SP : 1KP : 4 PP
A TENAGA 210,750.00
L.01 1.500 OH Pekerja 80,000.00 120,000.00
L.02 0.750 OH Tukang Batu 100,000.00 75,000.00
L.03 0.075 OH Kepala Tukang 105,000.00 7,875.00
L.04 0.075 OH Mandor 105,000.00 7,875.00

HALAMAN 62 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

B BAHAN 637,794.00
1.200 m3 Batu Belah 15/20 332,800.00 399,360.00
41.000 kg Portland Sement 1,120.00 45,920.00
0.131 m3 Kapur Pasang 200,000.00 26,200.00
0.523 m3 Pasir 318,000.00 166,314.00
C PERALATAN -
D JUMLAH A + B + C 848,544.00
E OVERHEAD & PROFIT (contoh 15%) 15% 127,281.60
F HARGA SATUAN PEKERJAAN (D+E) 975,825.60
9 A.3.2.1.9 1 m3 Pemasang Batu Kosong/Anstamping
A TENAGA 109,590.00
L.01 0.780 OH Pekerja 80,000.00 62,400.00
L.02 0.390 OH Tukang Batu 100,000.00 39,000.00
L.03 0.039 OH Kepala Tukang 105,000.00 4,095.00
L.04 0.039 OH Mandor 105,000.00 4,095.00
B BAHAN 484,464.00
1.200 m3 Batu Belah 15/20 332,800.00 399,360.00
0.432 m3 Pasir Urug 197,000.00 85,104.00
C PERALATAN -
D JUMLAH A + B + C 594,054.00
E OVERHEAD & PROFIT (contoh 15%) 15% 89,108.10
F HARGA SATUAN PEKERJAAN (D+E) 683,162.10
10 A.3.2.1.10 1 m3 Pasang Pondasi Siklop, 60% Beton Campuran 1PC : 2PB : 3KR & 40% Batu Belah
A TENAGA 381,675.00
L.01 3.400 OH Pekerja 80,000.00 272,000.00
L.02 0.850 OH Tukang Batu 100,000.00 85,000.00
L.03 0.085 OH Kepala Tukang 105,000.00 8,925.00
L.04 0.150 OH Mandor 105,000.00 15,750.00
B BAHAN 2,107,724.00
0.480 m3 Batu Belah 15/20 cm 332,800.00 159,744.00
126.000 Kg Besi Beton 11,500.00 1,449,000.00
194.000 Kg Portland Semen 1,120.00 217,280.00
0.312 m3 Pasir Beton 345,000.00 107,640.00
0.468 m3 Koral Beton 295,000.00 138,060.00
1.800 Kg Kawat Beton 20,000.00 36,000.00
C PERALATAN -
D JUMLAH A + B + C 2,489,399.00
E OVERHEAD & PROFIT (contoh 15%) 15% 373,409.85
F HARGA SATUAN PEKERJAAN (D+E) 2,862,808.85
11 A.3.2.1.11 1 m3 Pasang Pondasi Sumuran diameter 100 cm
A TENAGA 292,895.00
L.01 2.400 OH Pekerja 80,000.00 192,000.00
L.02 0.800 OH Tukang Batu 100,000.00 80,000.00
L.03 0.080 OH Kepala Tukang 105,000.00 8,400.00
L.04 0.119 OH Mandor 105,000.00 12,495.00
B BAHAN 554,240.00
0.450 m3 Batu Belah 15/20 cm 332,800.00 149,760.00
194.000 Kg Portland Semen 1,120.00 217,280.00
0.312 m3 Pasir Beton 345,000.00 107,640.00

HALAMAN 63 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

0.468 m3 Koral Beton 170,000.00 79,560.00


C PERALATAN -
D JUMLAH A + B + C 847,135.00
E OVERHEAD & PROFIT (contoh 15%) 15% 127,070.25
F HARGA SATUAN PEKERJAAN (D+E) 974,205.25
A.3.2.1.12 1 m3 Pemasangan Kembali Pondasi Batu Belah (bekas bongkaran) 1SP : 5 PP
A TENAGA 210,750.00
L.01 1.500 OH Pekerja 80,000.00 120,000.00
L.02 0.750 OH Tukang Batu 100,000.00 75,000.00
L.03 0.075 OH Kepala Tukang 105,000.00 7,875.00

HALAMAN 64 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

L.04 0.075 OH Mandor 105,000.00 7,875.00


B BAHAN 524,992.00
0.600 m3 Batu Belah 15/20 332,800.00 199,680.00
136.000 Kg Portland Sement 1,120.00 152,320.00
0.544 m3 Pasir pasang 318,000.00 172,992.00
C PERALATAN -
D JUMLAH A + B + C 735,742.00
E OVERHEAD & PROFIT (contoh 15%) 15% 110,361.30
F HARGA SATUAN PEKERJAAN (D+E) 846,103.30
A.3.2.1.13 1 m3 Pemasangan Bronjong Kawat pabrikasi
A TENAGA 27,150.00
L.01 0.300 OH Pekerja 80,000.00 24,000.00
L.04 0.030 OH Mandor 105,000.00 3,150.00
B BAHAN 733,040.00
1.300 m3 Batu blonos 290,800.00 378,040.00
1.000 bh Kawat Bronjong 355,000.00 355,000.00
C PERALATAN -
D JUMLAH A + B + C 760,190.00
E OVERHEAD & PROFIT (contoh 15%) 15% 114,028.50
F HARGA SATUAN PEKERJAAN (D+E) 874,218.50
IV A.4.1.1 HARGA SATUAN PEKERJAAN BETON
1 A.4.1.1.1 1 m3 Membuat Beton mutu f'c=7,4 Mpa (K100), slum (12±2)cm, w/c = 0,87
A TENAGA 171,155.00
L.01 1.650 OH Pekerja 80,000.00 132,000.00
L.02 0.275 OH Tukang Batu 100,000.00 27,500.00
L.03 0.028 OH Kepala Tukang 105,000.00 2,940.00
L.04 0.083 OH Mandor 105,000.00 8,715.00
B BAHAN 11,769,777.50
247.000 Kg Portland Semen 1,120.00 276,640.00
869.000 Kg Pasir Beton 431.25 374,756.25
999.000 Kg Kerikil (maksimum 30 mm) 368.75 368,381.25
215.000 ltr Air 50,000.00 10,750,000.00
C PERALATAN -
D JUMLAH A + B + C 11,940,932.50
E OVERHEAD & PROFIT (contoh 15%) 15% 1,791,139.88
F HARGA SATUAN PEKERJAAN (D+E) 13,732,072.38
2 A.4.1.1.2 1 m3 Membuat Beton mutu f'c=9,8 Mpa (K125), slum (12±2)cm, w/c = 0,78
A TENAGA 171,155.00
L.01 1.650 OH Pekerja 80,000.00 132,000.00
L.02 0.275 OH Tukang Batu 100,000.00 27,500.00
L.03 0.028 OH Kepala Tukang 105,000.00 2,940.00
L.04 0.083 OH Mandor 105,000.00 8,715.00
B BAHAN 11,789,370.00
276.000 Kg Portland Semen 1,120.00 309,120.00
828.000 kg Pasir Beton 431.25 357,075.00
1,012.000 kg Kerikil (maksimum 30 mm) 368.75 373,175.00
215.000 ltr Air 50,000.00 10,750,000.00
C PERALATAN -
D JUMLAH A + B + C 11,960,525.00

HALAMAN 65 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

E OVERHEAD & PROFIT (contoh 15%) 15% 1,794,078.75


F HARGA SATUAN PEKERJAAN (D+E) 13,754,603.75
3 A.4.1.1.3 1 m3 Membuat Beton mutu f'c=12,2 Mpa (K150), slum (12±2)cm, w/c = 0,72
A TENAGA 171,155.00
L.01 1.650 OH Pekerja 80,000.00 132,000.00
L.02 0.275 OH Tukang Batu 100,000.00 27,500.00
L.03 0.028 OH Kepala Tukang 105,000.00 2,940.00
L.04 0.083 OH Mandor 105,000.00 8,715.00

HALAMAN 66 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

B BAHAN 11,804,467.50
299.000 Kg Portland Semen 1,120.00 334,880.00
799.000 kg Pasir Beton 431.25 344,568.75
1,017.000 kg Kerikil (maksimum 30 mm) 368.75 375,018.75
215.000 ltr Air 50,000.00 10,750,000.00
C PERALATAN -
D JUMLAH A + B + C 11,975,622.50
E OVERHEAD & PROFIT (contoh 15%) 15% 1,796,343.38
F HARGA SATUAN PEKERJAAN (D+E) 13,771,965.88
4 A.4.1.1.4 1 m3 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87
A TENAGA 118,730.00
L.01 1.200 OH Pekerja 80,000.00 96,000.00
L.02 0.200 OH Tukang Batu 100,000.00 20,000.00
L.03 0.020 OH Kepala Tukang 105,000.00 2,100.00
L.04 0.006 OH Mandor 105,000.00 630.00
B BAHAN 11,021,412.50
230.000 Kg Portland Semen 1,120.00 257,600.00
893.000 kg Pasir Beton 431.25 385,106.25
1,027.000 kg Kerikil (maksimum 30 mm) 368.75 378,706.25
200.000 ltr Air 50,000.00 10,000,000.00
C PERALATAN -
D JUMLAH A + B + C 11,140,142.50
E OVERHEAD & PROFIT (contoh 15%) 15% 1,671,021.38
F HARGA SATUAN PEKERJAAN (D+E) 12,811,163.88
5 A.4.1.1.5 1 m3 Membuat Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66
A TENAGA 171,155.00
L.01 1.650 OH Pekerja 80,000.00 132,000.00
L.02 0.275 OH Tukang Batu 100,000.00 27,500.00
L.03 0.028 OH Kepala Tukang 105,000.00 2,940.00
L.04 0.083 OH Mandor 105,000.00 8,715.00
B BAHAN 11,822,313.75
326.000 Kg Portland Semen 1,120.00 365,120.00
760.000 Kg Pasir Beton 431.25 327,750.00
1,029.000 Kg Kerikil (maksimum 30 mm) 368.75 379,443.75
215.000 ltr Air 50,000.00 10,750,000.00
C PERALATAN -
D JUMLAH A + B + C 11,993,468.75
E OVERHEAD & PROFIT (contoh 15%) 15% 1,799,020.31
F HARGA SATUAN PEKERJAAN (D+E) 13,792,489.06
6 A.4.1.1.6 1 m3 Membuat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm, w/c = 0,61
A TENAGA 171,155.00
L.01 1.650 OH Pekerja 80,000.00 132,000.00
L.02 0.275 OH Tukang Batu 100,000.00 27,500.00
L.03 0.028 OH Kepala Tukang 105,000.00 2,940.00
L.04 0.083 OH Mandor 105,000.00 8,715.00
B BAHAN 11,839,665.00
352.000 Kg Portland Semen 1,120.00 394,240.00
731.000 Kg Pasir Beton 431.25 315,243.75
1,031.000 Kg Kerikil (maksimum 30 mm) 368.75 380,181.25

HALAMAN 67 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

215.000 ltr Air 50,000.00 10,750,000.00


C PERALATAN -
D JUMLAH A + B + C 12,010,820.00
E OVERHEAD & PROFIT (contoh 15%) 15% 1,801,623.00
F HARGA SATUAN PEKERJAAN (D+E) 13,812,443.00
7 A.4.1.1.7 1 m3 Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58
A TENAGA 171,155.00
L.01 1.650 OH Pekerja 80,000.00 132,000.00
L.02 0.275 OH Tukang Batu 100,000.00 27,500.00
L.03 0.028 OH Kepala Tukang 105,000.00 2,940.00

HALAMAN 68 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

L.04 0.083 OH Mandor 105,000.00 8,715.00


B BAHAN 11,852,613.75
371.000 Kg Portland Semen 1,120.00 415,520.00
698.000 Kg Pasir Beton 431.25 301,012.50
1,047.000 Kg Kerikil (maksimum 30 mm) 368.75 386,081.25
215.000 ltr Air 50,000.00 10,750,000.00
C PERALATAN -
D JUMLAH A + B + C 12,023,768.75
E OVERHEAD & PROFIT (contoh 15%) 15% 1,803,565.31
F HARGA SATUAN PEKERJAAN (D+E) 13,827,334.06
8 A.4.1.1.8 1 m3 Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56
A TENAGA 171,155.00
L.01 1.650 OH Pekerja 80,000.00 132,000.00
L.02 0.275 OH Tukang Batu 100,000.00 27,500.00
L.03 0.028 OH Kepala Tukang 105,000.00 2,940.00
L.04 0.083 OH Mandor 105,000.00 8,715.00
B BAHAN 11,861,636.25
384.000 Kg Portland Semen 1,120.00 430,080.00
692.000 Kg Pasir Beton 431.25 298,425.00
1,039.000 Kg Kerikil (maksimum 30 mm) 368.75 383,131.25
215.000 ltr Air 50,000.00 10,750,000.00
C PERALATAN -
D JUMLAH A + B + C 12,032,791.25
E OVERHEAD & PROFIT (contoh 15%) 15% 1,804,918.69
F HARGA SATUAN PEKERJAAN (D+E) 13,837,709.94
9 A.4.1.1.9 1 m3 Membuat Lantai Kerja Beton mutu f'c=24,0 MPa(K275),slum(12±2)cm,w/c=0,53
A TENAGA 171,155.00
L.01 1.650 OH Pekerja 80,000.00 132,000.00
L.02 0.275 OH Tukang Batu 100,000.00 27,500.00
L.03 0.028 OH Kepala Tukang 105,000.00 2,940.00
L.04 0.083 OH Mandor 105,000.00 8,715.00
B BAHAN 11,878,032.50
406.000 Kg Portland Semen 1,120.00 454,720.00
684.000 kg Pasir Beton 431.25 294,975.00
1,026.000 kg Kerikil (maksimum 30 mm) 368.75 378,337.50
215.000 ltr Air 50,000.00 10,750,000.00
C PERALATAN -
D JUMLAH A + B + C 12,049,187.50
E OVERHEAD & PROFIT (contoh 15%) 15% 1,807,378.13
F HARGA SATUAN PEKERJAAN (D+E) 13,856,565.63
10 A.4.1.1.10 1 m3 Membuat Beton mutu f'c=26,4 MPa (K300), slum (12±2)cm, w/c = 0,52
A TENAGA 171,155.00
L.01 1.650 OH Pekerja 80,000.00 132,000.00
L.02 0.275 OH Tukang Batu 100,000.00 27,500.00
L.03 0.028 OH Kepala Tukang 105,000.00 2,940.00
L.04 0.083 OH Mandor 105,000.00 8,715.00
B BAHAN 11,882,735.00
413.000 Kg Portland Semen 1,120.00 462,560.00
681.000 Kg Pasir Beton 431.25 293,681.25

HALAMAN 69 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

1,021.000 Kg Kerikil (maksimum 30 mm) 368.75 376,493.75


215.000 ltr Air 50,000.00 10,750,000.00
C PERALATAN -
D JUMLAH A + B + C 12,053,890.00
E OVERHEAD & PROFIT (contoh 15%) 15% 1,808,083.50
F HARGA SATUAN PEKERJAAN (D+E) 13,861,973.50
11 A.4.1.1.11 1 m3 Membuat Beton mutu f'c=28,8 MPa (K325), slum (12±2)cm, w/c = 0,49
A TENAGA 217,700.00
L.01 2.100 OH Pekerja 80,000.00 168,000.00
L.02 0.350 OH Tukang Batu 100,000.00 35,000.00

HALAMAN 70 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

L.03 0.035 OH Kepala Tukang 105,000.00 3,675.00


L.04 0.105 OH Mandor 105,000.00 11,025.00
B BAHAN 11,901,580.00
439.000 Kg Portland Semen 1,120.00 491,680.00
670.000 Kg Pasir Beton 431.25 288,937.50
1,006.000 Kg Kerikil (maksimum 30 mm) 368.75 370,962.50
215.000 ltr Air 50,000.00 10,750,000.00
C PERALATAN -
D JUMLAH A + B + C 12,119,280.00
E OVERHEAD & PROFIT (contoh 15%) 15% 1,817,892.00
F HARGA SATUAN PEKERJAAN (D+E) 13,937,172.00
12 A.4.1.1.12 1 m3 Membuat Beton mutu f'c=31,2 MPa (K350), slum (12±2)cm, w/c = 0,48
A TENAGA 217,700.00
L.01 2.100 OH Pekerja 80,000.00 168,000.00
L.02 0.350 OH Tukang Batu 100,000.00 35,000.00
L.03 0.035 OH Kepala Tukang 105,000.00 3,675.00
L.04 0.105 OH Mandor 105,000.00 11,025.00
B BAHAN 11,908,153.75
448.000 Kg Portland Semen 1,120.00 501,760.00
667.000 Kg Pasir Beton 431.25 287,643.75
1,000.000 Kg Kerikil (maksimum 30 mm) 368.75 368,750.00
215.000 ltr Air 50,000.00 10,750,000.00
C PERALATAN -
D JUMLAH A + B + C 12,125,853.75
E OVERHEAD & PROFIT (contoh 15%) 15% 1,818,878.06
F HARGA SATUAN PEKERJAAN (D+E) 13,944,731.81
13 A.4.1.1.17 10 Kg Pembesian dg Besi Polos atau Besi Ulir
A TENAGA 13,755.00
L.01 0.070 OH Pekerja 80,000.00 5,600.00
L.02 0.070 OH Tukang Besi 100,000.00 7,000.00
L.03 0.007 OH Kepala Tukang 105,000.00 735.00
L.04 0.004 OH Mandor 105,000.00 420.00
B BAHAN 123,750.00
10.500 Kg Besi Beton (polos/ulir) 11,500.00 120,750.00
0.150 Kg Kawat Beton 20,000.00 3,000.00
C PERALATAN -
D JUMLAH A + B + C 137,505.00
E OVERHEAD & PROFIT (contoh 15%) 15% 20,625.75
F HARGA SATUAN PEKERJAAN (D+E) 158,130.75
14 A.4.1.1.18 10 Kg Kabel Presstresed Polos/strand
A TENAGA 9,840.00
L.01 0.050 OH Pekerja 80,000.00 4,000.00
L.02 0.050 OH Tukang Besi 100,000.00 5,000.00
L.03 0.005 OH Kepala Tukang 105,000.00 525.00
L.04 0.003 OH Mandor 105,000.00 315.00
B BAHAN 112,250.00
10.500 Kg Besi presstred polos 10,500.00 110,250.00
0.100 Kg Kawat Beton 20,000.00 2,000.00
C PERALATAN -

HALAMAN 71 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

D JUMLAH A + B + C 122,090.00
E OVERHEAD & PROFIT (contoh 15%) 15% 18,313.50
F HARGA SATUAN PEKERJAAN (D+E) 140,403.50
15 A.4.1.1.19 10 Kg Jaring Kawat baja/Wire Mesh
A TENAGA 4,815.00
L.01 0.025 OH Pekerja 80,000.00 2,000.00
L.02 0.025 OH Tukang Besi 100,000.00 2,500.00
L.03 0.002 OH Kepala Tukang 105,000.00 210.00
L.04 0.001 OH Mandor 105,000.00 105.00

HALAMAN 72 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

B BAHAN 9,793,000.00
10.200 Kg Jaring Kawat Baja dilas 960,000.00 9,792,000.00
0.050 Kg Kawat Beton 20,000.00 1,000.00
C PERALATAN -
D JUMLAH A + B + C 9,797,815.00
E OVERHEAD & PROFIT (contoh 15%) 15% 1,469,672.25
F HARGA SATUAN PEKERJAAN (D+E) 11,267,487.25
16 A.4.1.1.20 1 m2 Memasang Bekisting untuk Pondasi
A TENAGA 73,060.00
L.01 0.520 OH Pekerja 80,000.00 41,600.00
L.02 0.260 OH Tukang Kayu 100,000.00 26,000.00
L.03 0.026 OH Kepala Tukang 105,000.00 2,730.00
L.04 0.026 OH Mandor 105,000.00 2,730.00
B BAHAN 119,300.00
0.040 m3 Papan kayu pinus 2,800,000.00 112,000.00
0.300 Kg Paku Biasa 2" - 5" 21,000.00 6,300.00
0.100 Ltr Minyak Bekisting 10,000.00 1,000.00
C PERALATAN -
D JUMLAH A + B + C 192,360.00
E OVERHEAD & PROFIT (contoh 15%) 15% 28,854.00
F HARGA SATUAN PEKERJAAN (D+E) 221,214.00
16 A.4.1.1.20a 1 m2 Memasang Bekisting untuk Pondasi (papan kayu lokal)
A TENAGA 73,060.00
L.01 0.520 OH Pekerja 80,000.00 41,600.00
L.02 0.260 OH Tukang Kayu 100,000.00 26,000.00
L.03 0.026 OH Kepala Tukang 105,000.00 2,730.00
L.04 0.026 OH Mandor 105,000.00 2,730.00
B BAHAN 65,300.00
0.040 m3 Papan kayu lokal 1,450,000.00 58,000.00
0.300 Kg Paku Biasa 2" - 5" 21,000.00 6,300.00
0.100 Ltr Minyak Bekisting 10,000.00 1,000.00
C PERALATAN -
D JUMLAH A + B + C 138,360.00
E OVERHEAD & PROFIT (contoh 15%) 15% 20,754.00
F HARGA SATUAN PEKERJAAN (D+E) 159,114.00
17 A.4.1.1.21 1 m2 Memasang Bekisting untuk Sloof
A TENAGA 73,060.00
L.01 0.520 OH Pekerja 80,000.00 41,600.00
L.02 0.260 OH Tukang Kayu 100,000.00 26,000.00
L.03 0.026 OH Kepala Tukang 105,000.00 2,730.00
L.04 0.026 OH Mandor 105,000.00 2,730.00
B BAHAN 133,300.00
0.045 m3 Papan kayu pinus 2,800,000.00 126,000.00
0.300 Kg Paku Biasa 2" - 5" 21,000.00 6,300.00
0.100 Ltr Minyak Bekisting 10,000.00 1,000.00
C PERALATAN -
D JUMLAH A + B + C 206,360.00
E OVERHEAD & PROFIT (contoh 15%) 15% 30,954.00
F HARGA SATUAN PEKERJAAN (D+E) 237,314.00

HALAMAN 73 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

17 A.4.1.1.21a 1 m2 Memasang Bekisting untuk Sloof (2x pakai)


A TENAGA 73,060.00
L.01 0.520 OH Pekerja 80,000.00 41,600.00
L.02 0.260 OH Tukang Kayu 100,000.00 26,000.00
L.03 0.026 OH Kepala Tukang 105,000.00 2,730.00
L.04 0.026 OH Mandor 105,000.00 2,730.00
B BAHAN 69,800.00
0.023 m3 Papan kayu pinus 2,800,000.00 63,000.00
0.300 Kg Paku Biasa 2" - 5" 21,000.00 6,300.00

HALAMAN 74 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

0.050 Ltr Minyak Bekisting 10,000.00 500.00


C PERALATAN -
D JUMLAH A + B + C 142,860.00
E OVERHEAD & PROFIT (contoh 15%) 15% 21,429.00
F HARGA SATUAN PEKERJAAN (D+E) 164,289.00
18 A.4.1.1.22 1 m2 Memasang Bekisting untuk Kolom
A TENAGA 92,730.00
L.01 0.660 OH Pekerja 80,000.00 52,800.00
L.02 0.330 OH Tukang Kayu 100,000.00 33,000.00
L.03 0.033 OH Kepala Tukang 105,000.00 3,465.00
L.04 0.033 OH Mandor 105,000.00 3,465.00
B BAHAN 248,650.00
0.040 m3 Papan kayu pinus 2,800,000.00 112,000.00
0.400 Kg Paku Biasa 2" - 5" 21,000.00 8,400.00
0.200 Ltr Minyak Bekisting 10,000.00 2,000.00
0.015 m3 Balok Kayu lokal 2,100,000.00 31,500.00
0.350 Lbr Tripleks tebal 9mm 145,000.00 50,750.00
2.000 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m 22,000.00 44,000.00
C PERALATAN -
D JUMLAH A + B + C 341,380.00
E OVERHEAD & PROFIT (contoh 15%) 15% 51,207.00
F HARGA SATUAN PEKERJAAN (D+E) 392,587.00
18 A.4.1.1.22a 1 m2 Memasang Bekisting untuk Kolom
A TENAGA 92,730.00
L.01 0.660 OH Pekerja 80,000.00 52,800.00
L.02 0.330 OH Tukang Kayu 100,000.00 33,000.00
L.03 0.033 OH Kepala Tukang 105,000.00 3,465.00
L.04 0.033 OH Mandor 105,000.00 3,465.00
B BAHAN 122,400.00
0.040 m3 Papan cetak pinus 2,800,000.00 112,000.00
0.400 Kg Paku Biasa 2" - 5" 21,000.00 8,400.00
0.200 Ltr Minyak Bekisting 10,000.00 2,000.00
C PERALATAN -
D JUMLAH A + B + C 215,130.00
E OVERHEAD & PROFIT (contoh 15%) 15% 32,269.50
F HARGA SATUAN PEKERJAAN (D+E) 247,399.50
18 A.4.1.1.22b 1 m2 Memasang Bekisting untuk Kolom (2x pakai)
A TENAGA 92,730.00
L.01 0.660 OH Pekerja 80,000.00 52,800.00
L.02 0.330 OH Tukang Kayu 100,000.00 33,000.00
L.03 0.033 OH Kepala Tukang 105,000.00 3,465.00
L.04 0.033 OH Mandor 105,000.00 3,465.00
B BAHAN 65,400.00
0.020 m3 Papan cetak pinus 2,800,000.00 56,000.00
0.400 Kg Paku Biasa 2" - 5" 21,000.00 8,400.00
0.100 Ltr Minyak Bekisting 10,000.00 1,000.00
C PERALATAN -
D JUMLAH A + B + C 158,130.00
E OVERHEAD & PROFIT (contoh 15%) 15% 23,719.50

HALAMAN 75 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

F HARGA SATUAN PEKERJAAN (D+E) 181,849.50


18 A.4.1.1.22c 1 m2 Memasang Bekisting untuk Kolom (ekspose) 2x pakai
A TENAGA 92,730.00
L.01 0.660 OH Pekerja 80,000.00 52,800.00
L.02 0.330 OH Tukang Kayu 100,000.00 33,000.00
L.03 0.033 OH Kepala Tukang 105,000.00 3,465.00
L.04 0.033 OH Mandor 105,000.00 3,465.00
B BAHAN 129,525.00
0.020 m3 Papan cetak pinus 2,800,000.00 56,000.00
0.400 Kg Paku Biasa 2" - 5" 21,000.00 8,400.00

HALAMAN 76 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

0.200 Ltr Minyak Bekisting 10,000.00 2,000.00


0.008 m3 Balok Kayu Lokal 2,100,000.00 15,750.00
0.175 Lbr Tripleks tebal 9mm 145,000.00 25,375.00
1.000 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m 22,000.00 22,000.00
C PERALATAN -
D JUMLAH A + B + C 222,255.00
E OVERHEAD & PROFIT (contoh 15%) 15% 33,338.25
F HARGA SATUAN PEKERJAAN (D+E) 255,593.25
19 A.4.1.1.23 1 m2 Memasang Bekisting untuk Balok
A TENAGA 92,730.00
L.01 0.660 OH Pekerja 80,000.00 52,800.00
L.02 0.330 OH Tukang Kayu 100,000.00 33,000.00
L.03 0.033 OH Kepala Tukang 105,000.00 3,465.00
L.04 0.033 OH Mandor 105,000.00 3,465.00
B BAHAN 254,950.00
0.040 m3 Papan kayu pinus 2,800,000.00 112,000.00
0.400 Kg Paku Biasa 2" - 5" 21,000.00 8,400.00
0.200 Ltr Minyak Bekisting 10,000.00 2,000.00
0.018 m3 Balok Kayu lokal 2,100,000.00 37,800.00
0.350 Lbr triplesk tebal 9mm 145,000.00 50,750.00
2.000 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m 22,000.00 44,000.00
C PERALATAN -
D JUMLAH A + B + C 347,680.00
E OVERHEAD & PROFIT (contoh 15%) 15% 52,152.00
F HARGA SATUAN PEKERJAAN (D+E) 399,832.00
19 A.4.1.1.23a 1 m2 Memasang Bekisting untuk Balok
A TENAGA 92,730.00
L.01 0.660 OH Pekerja 80,000.00 52,800.00
L.02 0.330 OH Tukang Kayu 100,000.00 33,000.00
L.03 0.033 OH Kepala Tukang 105,000.00 3,465.00
L.04 0.033 OH Mandor 105,000.00 3,465.00
B BAHAN 122,400.00
0.040 m3 Papan cetak pinus 2,800,000.00 112,000.00
0.400 Kg Paku Biasa 2" - 5" 21,000.00 8,400.00
0.200 Ltr Minyak Bekisting 10,000.00 2,000.00
C PERALATAN -
D JUMLAH A + B + C 215,130.00
E OVERHEAD & PROFIT (contoh 15%) 15% 32,269.50
F HARGA SATUAN PEKERJAAN (D+E) 247,399.50
19 A.4.1.1.23b 1 m2 Memasang Bekisting untuk Balok (2x pakai)
A TENAGA 92,730.00
L.01 0.660 OH Pekerja 80,000.00 52,800.00
L.02 0.330 OH Tukang Kayu 100,000.00 33,000.00
L.03 0.033 OH Kepala Tukang 105,000.00 3,465.00
L.04 0.033 OH Mandor 105,000.00 3,465.00
B BAHAN 65,400.00
0.020 m3 Papan cetak pinus 2,800,000.00 56,000.00
0.400 Kg Paku Biasa 2" - 5" 21,000.00 8,400.00
0.100 Ltr Minyak Bekisting 10,000.00 1,000.00

HALAMAN 77 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

C PERALATAN -
D JUMLAH A + B + C 158,130.00
E OVERHEAD & PROFIT (contoh 15%) 15% 23,719.50
F HARGA SATUAN PEKERJAAN (D+E) 181,849.50
19 A.4.1.1.23c 1 m2 Memasang Bekisting untuk Balok (ekspose) 2x pakai
A TENAGA 92,730.00
L.01 0.660 OH Pekerja 80,000.00 52,800.00
L.02 0.330 OH Tukang Kayu 100,000.00 33,000.00
L.03 0.033 OH Kepala Tukang 105,000.00 3,465.00
L.04 0.033 OH Mandor 105,000.00 3,465.00

HALAMAN 78 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

B BAHAN 132,675.00
0.020 m3 Papan cetak pinus 2,800,000.00 56,000.00
0.400 Kg Paku Biasa 2" - 5" 21,000.00 8,400.00
0.200 Ltr Minyak Bekisting 10,000.00 2,000.00
0.009 m3 Balok Kayu Lokal 2,100,000.00 18,900.00
0.175 Lbr Tripleks tebal 9mm 145,000.00 25,375.00
1.000 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m 22,000.00 22,000.00
C PERALATAN -
D JUMLAH A + B + C 225,405.00
E OVERHEAD & PROFIT (contoh 15%) 15% 33,810.75
F HARGA SATUAN PEKERJAAN (D+E) 259,215.75
20 A.4.1.1.24 1 m2 Memasang Bekisting untuk Lantai
A TENAGA 92,730.00
L.01 0.660 OH Pekerja 80,000.00 52,800.00
L.02 0.330 OH Tukang Kayu 100,000.00 33,000.00
L.03 0.033 OH Kepala Tukang 105,000.00 3,465.00
L.04 0.033 OH Mandor 105,000.00 3,465.00
B BAHAN 336,650.00
0.040 m3 Papan cetak pinus 2,800,000.00 112,000.00
0.400 Kg Paku Biasa 2" - 5" 21,000.00 8,400.00
0.200 Ltr Minyak Bekisting 10,000.00 2,000.00
0.015 m3 Balok Kayu lokal 2,100,000.00 31,500.00
0.350 Lbr Tripleks tebal 9mm 145,000.00 50,750.00
6.000 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m 22,000.00 132,000.00
C PERALATAN -
D JUMLAH A + B + C 429,380.00
E OVERHEAD & PROFIT (contoh 15%) 15% 64,407.00
F HARGA SATUAN PEKERJAAN (D+E) 493,787.00
20 A.4.1.1.24a 1 m2 Memasang Bekisting untuk Lantai (papan kayu lokal)
A TENAGA 92,730.00
L.01 0.660 OH Pekerja 80,000.00 52,800.00
L.02 0.330 OH Tukang Kayu 100,000.00 33,000.00
L.03 0.033 OH Kepala Tukang 105,000.00 3,465.00
L.04 0.033 OH Mandor 105,000.00 3,465.00
B BAHAN 224,650.00
0.400 Kg Paku Biasa 2" - 5" 21,000.00 8,400.00
0.200 Ltr Minyak Bekisting 10,000.00 2,000.00
0.015 m3 Balok Kayu lokal 2,100,000.00 31,500.00
0.350 Lbr tripleks tebal 9mm 145,000.00 50,750.00
6.000 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m 22,000.00 132,000.00
C PERALATAN -
D JUMLAH A + B + C 317,380.00
E OVERHEAD & PROFIT (contoh 15%) 15% 47,607.00
F HARGA SATUAN PEKERJAAN (D+E) 364,987.00
21 A.4.1.1.25 1 m2 Memasang Bekisting untuk Dinding
A TENAGA 92,730.00
L.01 0.660 OH Pekerja 80,000.00 52,800.00
L.02 0.330 OH Tukang Kayu 100,000.00 33,000.00
L.03 0.033 OH Kepala Tukang 105,000.00 3,465.00

HALAMAN 79 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

L.04 0.033 OH Mandor 105,000.00 3,465.00


B BAHAN 220,650.00
0.030 m3 Kayu lokal papan 1,450,000.00 43,500.00
0.400 Kg Paku Biasa 2" - 5" 21,000.00 8,400.00
0.200 Ltr Minyak Bekisting 10,000.00 2,000.00
0.020 m3 Balok Kayu Lokal 2,100,000.00 42,000.00
0.350 Lbr Tripleks tebal 9mm 145,000.00 50,750.00
3.000 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m 22,000.00 66,000.00

HALAMAN 80 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

4.000 Buah Formite/Penjaga jarak / Spacer (alat bantu) 2,000.00 8,000.00


C PERALATAN -
D JUMLAH A + B + C 313,380.00
E OVERHEAD & PROFIT (contoh 15%) 15% 47,007.00
F HARGA SATUAN PEKERJAAN (D+E) 360,387.00
22 A.4.1.1.26 1 m2 Memasang Bekisting untuk Tangga
A TENAGA 92,730.00
L.01 0.660 OH Pekerja 80,000.00 52,800.00
L.02 0.330 OH Tukang Kayu 100,000.00 33,000.00
L.03 0.033 OH Kepala Tukang 105,000.00 3,465.00
L.04 0.033 OH Mandor 105,000.00 3,465.00
B BAHAN 179,650.00
0.030 m3 Kayu lokal papan 1,450,000.00 43,500.00
0.400 Kg Paku Biasa 2" - 5" 21,000.00 8,400.00
0.150 Ltr Minyak Bekisting 10,000.00 1,500.00
0.015 m3 Balok Kayu Lokal 2,100,000.00 31,500.00
0.350 Lbr Tripleks tebal 9mm 145,000.00 50,750.00
2.000 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m 22,000.00 44,000.00
C PERALATAN -
D JUMLAH A + B + C 272,380.00
E OVERHEAD & PROFIT (contoh 15%) 15% 40,857.00
F HARGA SATUAN PEKERJAAN (D+E) 313,237.00
23 A.4.1.1.27 1 m2 Memasang Jembatan Cor
A TENAGA 18,365.00
L.01 0.150 OH Pekerja 80,000.00 12,000.00
L.02 0.050 OH Tukang Kayu 100,000.00 5,000.00
L.03 0.005 OH Kepala Tukang 105,000.00 525.00
L.04 0.008 OH Mandor 105,000.00 840.00
B BAHAN 97,520.00
0.026 m3 Kayu Terentang (papan cetak pinus) 2,800,000.00 73,920.00
0.600 kg Paku Biasa 2" - 5" 21,000.00 12,600.00
0.500 m3 Dolken Kayu Galam diameter 8 - 10 / 4 m 22,000.00 11,000.00
C PERALATAN -
D JUMLAH A + B + C 115,885.00
E OVERHEAD & PROFIT (contoh 15%) 15% 17,382.75
F HARGA SATUAN PEKERJAAN (D+E) 133,267.75
24 A.4.1.1.28 1 m' Membuat Ring Balok Beton Bertulang (11 x 11) cm
A TENAGA 21,975.00
L.01 0.180 OH Pekerja 80,000.00 14,400.00
L.02 0.020 OH Tukang batu 100,000.00 2,000.00
L.02 0.020 OH Tukang Kayu 100,000.00 2,000.00
L.02 0.020 OH Tukang Besi 100,000.00 2,000.00
L.03 0.006 OH Kepala Tukang 105,000.00 630.00
L.04 0.009 OH Mandor 105,000.00 945.00
B BAHAN 55,815.00
0.002 m3 Kayu lokal papan 1,450,000.00 2,900.00
0.010 Kg Paku Biasa 2" - 5" 21,000.00 210.00
3.000 Kg Besi Beton Polos 11,500.00 34,500.00
0.450 Kg Kawat Beton 20,000.00 9,000.00

HALAMAN 81 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

4.000 Kg Portland Semen 1,120.00 4,480.00


0.006 m3 Pasir Beton 345,000.00 2,070.00
0.009 m3 Kerikil 295,000.00 2,655.00
C PERALATAN -
D JUMLAH A + B + C 77,790.00
E OVERHEAD & PROFIT (contoh 15%) 15% 11,668.50
F HARGA SATUAN PEKERJAAN (D+E) 89,458.50

HALAMAN 82 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

25 A.4.1.1.29 1 m' Membuat Ring Balok Beton Bertulang (10 x 15) cm


A TENAGA 36,285.00
L.01 0.297 OH Pekerja 80,000.00 23,760.00
L.02 0.033 OH Tukang batu 100,000.00 3,300.00
L.02 0.033 OH Tukang Kayu 100,000.00 3,300.00
L.02 0.033 OH Tukang Besi 100,000.00 3,300.00
L.03 0.010 OH Kepala Tukang 105,000.00 1,050.00
L.04 0.015 OH Mandor 105,000.00 1,575.00
B BAHAN 60,860.00
0.003 m3 Kayu lokal papan 1,450,000.00 4,350.00
0.020 Kg Paku Biasa 2" - 5" 21,000.00 420.00
3.600 Kg Besi Beton Polos 11,500.00 41,400.00
0.050 Kg Kawat Beton 20,000.00 1,000.00
5.500 Kg Portland Semen 1,120.00 6,160.00
0.009 m3 Pasir Beton 345,000.00 3,105.00
0.015 m3 Kerikil 295,000.00 4,425.00
C PERALATAN -
D JUMLAH A + B + C 97,145.00
E OVERHEAD & PROFIT (contoh 15%) 15% 14,571.75
F HARGA SATUAN PEKERJAAN (D+E) 111,716.75

IV A A.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK


UNTUK PRODUKSI PRACETAK BISA DILAKUKAN DI PABRIK (COR DI PLANT)
ATAU DI LAPANGAN (CAST IN PLACE).
INDEKS YANG ADA DALAM PEDOMAN INI HANYA UNTUK PEKERJAAN PRODUKSI
YANG DILAKUKAN DI LAPANGAN, TERUTAMA UNTUK ANALISA CETAKAN (BEKISTING)
PRACETAK BAIK UNTUK KOMPONEN KOLOM, BALOK DAN PELAT.
1 A.4.1.2.1 1 m2 Pembuatan Lahan Produksi Tebal 8 cm Beton f'c 14,5 Mpa, Slump (120 ± 20) mm K3
A TENAGA 13,705.00
L.01 0.132 OH Pekerja 80,000.00 10,560.00
L.02 0.022 OH Tukang Batu 100,000.00 2,200.00
L.03 0.002 OH Kepala Tukang 105,000.00 210.00
L.04 0.007 OH Mandor 105,000.00 735.00
B BAHAN 945,785.10
26.080 Kg Portland Semen 1,120.00 29,209.60
60.800 Kg Pasir Beton 431.25 26,220.00
82.320 Kg Kerikil (maksimum 30 mm) 368.75 30,355.50
17.200 ltr Air 50,000.00 860,000.00
C PERALATAN -
D JUMLAH A + B + C 959,490.10
E OVERHEAD & PROFIT (contoh 15%) 15% 143,923.51
F HARGA SATUAN PEKERJAAN (D+E) 1,103,413.62
2 A.4.1.2.2 1 m2 Pembuatan Lahan Produksi Tebal 10 cm Beton f'c = 14,5 Mpa slum (120 ± 20 ) mm K3
A TENAGA 17,155.00
L.01 0.165 OH Pekerja 80,000.00 13,200.00
L.02 0.028 OH Tukang Batu 100,000.00 2,800.00
L.03 0.003 OH Kepala Tukang 105,000.00 315.00
L.04 0.008 OH Mandor 105,000.00 840.00
B BAHAN 1,182,231.38

HALAMAN 83 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

32.600 Kg Portland Semen 1,120.00 36,512.00


76.000 kg Pasir Beton 431.25 32,775.00
102.900 kg Kerikil (maksimum 30 mm) 368.75 37,944.38
21.500 ltr Air 50,000.00 1,075,000.00
C PERALATAN -
D JUMLAH A + B + C 1,199,386.38
E OVERHEAD & PROFIT (contoh 15%) 15% 179,907.96
F HARGA SATUAN PEKERJAAN (D+E) 1,379,294.33

HALAMAN 84 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

3 A.4.1.2.3 1 m2 Pembuatan Lahan Produksi Tebal 12 cm Beton f'c=14,5 Mpa, slum (120±20)mm, K3
A TENAGA 17,865.00
L.01 0.165 OH Pekerja 80,000.00 13,200.00
L.02 0.033 OH Tukang Batu 100,000.00 3,300.00
L.03 0.003 OH Kepala Tukang 105,000.00 315.00
L.04 0.010 OH Mandor 105,000.00 1,050.00
B BAHAN 1,418,677.65
39.120 Kg Portland Semen 1,120.00 43,814.40
91.200 kg Pasir Beton 431.25 39,330.00
123.480 kg Kerikil (maksimum 30 mm) 368.75 45,533.25
25.800 ltr Air 50,000.00 1,290,000.00
C PERALATAN -
D JUMLAH A + B + C 1,436,542.65
E OVERHEAD & PROFIT (contoh 15%) 15% 215,481.40
F HARGA SATUAN PEKERJAAN (D+E) 1,652,024.05
4 A.4.1.2.4 1 m2 Pembuatan Lahan Produksi Tebal 15 cm Beton f'c=14,5 Mpa, slum (120±20)mm, K3
A TENAGA 25,725.00
L.01 0.248 OH Pekerja 80,000.00 19,840.00
L.02 0.041 OH Tukang Batu 100,000.00 4,100.00
L.03 0.004 OH Kepala Tukang 105,000.00 420.00
L.04 0.013 OH Mandor 105,000.00 1,365.00
B BAHAN 1,773,347.06
48.900 Kg Portland Semen 1,120.00 54,768.00
114.000 kg Pasir Beton 431.25 49,162.50
154.350 kg Kerikil (maksimum 30 mm) 368.75 56,916.56
32.250 ltr Air 50,000.00 1,612,500.00
C PERALATAN -
D JUMLAH A + B + C 1,799,072.06
E OVERHEAD & PROFIT (contoh 15%) 15% 269,860.81
F HARGA SATUAN PEKERJAAN (D+E) 2,068,932.87
5 A.4.1.2.5 1 m2 Pembuatan Bekisting untuk Plat Beton Pra cetak (5 kali Pakai)
A TENAGA 9,105.00
L.01 0.007 OH Pekerja 80,000.00 560.00
L.02 0.076 OH Tukang Batu 100,000.00 7,600.00
L.03 0.008 OH Kepala Tukang 105,000.00 840.00
L.04 0.001 OH Mandor 105,000.00 105.00
B BAHAN 305,490.68
0.008 m3 Lantai Kerja Tebal 10 cm (K100) 13,732,072.38 109,856.58
9.394 Kg Besi Hollow (50x50x3) mm 13,650.00 128,228.10
0.005 m3 Kayu Kaso 5/7 kruing 4,470,000.00 22,350.00
0.080 lbr Phenol film 12 mm 150,000.00 12,000.00
0.200 ltr Minyak Bekisting 10,000.00 2,000.00
3.882 bh Dinabolt Ø 12 mm (10 s/d 15 cm) 8,000.00 31,056.00
C PERALATAN -
D JUMLAH A + B + C 314,595.68
E OVERHEAD & PROFIT (contoh 15%) 15% 47,189.35
F HARGA SATUAN PEKERJAAN (D+E) 361,785.03
6 A.4.1.2.6 1 m2 Pembuatan Bekisting untuk Balok Beton Pra cetak (10 - 12 kali Pakai)
A TENAGA 4,645.00

HALAMAN 85 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

L.01 0.004 OH Pekerja 80,000.00 320.00


L.02 0.038 OH Tukang Batu 100,000.00 3,800.00
L.03 0.004 OH Kepala Tukang 105,000.00 420.00
L.04 0.001 OH Mandor 105,000.00 105.00
B BAHAN 37,310.00
0.046 Kg Paku (5 s/d 7) cm 21,000.00 966.00
0.005 m3 Kayu Kaso 5/7 KRUING 4,470,000.00 22,350.00
0.043 lbr Phenol film 12 mm 150,000.00 6,450.00
0.200 ltr Minyak Bekisting 10,000.00 2,000.00

HALAMAN 86 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

0.693 bh Dinabolt Ø 12 mm (10 s/d 15 cm) 8,000.00 5,544.00


C PERALATAN -
D JUMLAH A + B + C 41,955.00
E OVERHEAD & PROFIT (contoh 15%) 15% 6,293.25
F HARGA SATUAN PEKERJAAN (D+E) 48,248.25
7 A.4.1.2.7 1 m2 Pembuatan Bekisting untuk Kolom Beton Pra cetak (10 - 12 kali Pakai)
A TENAGA 4,645.00
L.01 0.004 OH Pekerja 80,000.00 320.00
L.02 0.038 OH Tukang Batu 100,000.00 3,800.00
L.03 0.004 OH Kepala Tukang 105,000.00 420.00
L.04 0.001 OH Mandor 105,000.00 105.00
B BAHAN 33,590.00
0.046 Kg Paku (5 s/d 7) cm 21,000.00 966.00
0.004 m3 Kayu Kaso 5/7 kruing 4,470,000.00 17,880.00
0.048 lbr Phenol film 12 mm 150,000.00 7,200.00
0.200 ltr Minyak Bekisting 10,000.00 2,000.00
0.693 bh Dinabolt Ø 12 mm (10 s/d 15 cm) 8,000.00 5,544.00
C PERALATAN -
D JUMLAH A + B + C 38,235.00
E OVERHEAD & PROFIT (contoh 15%) 15% 5,735.25
F HARGA SATUAN PEKERJAAN (D+E) 43,970.25
8 A.4.1.2.8 1 bh Pemasangan dan Membuka Bekisting untuk Komponen Plat Beton Pracetak
A TENAGA 6,565.00
L.01 0.053 OH Pekerja 80,000.00 4,240.00
L.02 0.018 OH Tukang Batu 100,000.00 1,800.00
L.04 0.005 OH Mandor 105,000.00 525.00
B BAHAN -
C PERALATAN -
D JUMLAH A + B + C 6,565.00
E OVERHEAD & PROFIT (contoh 15%) 15% 984.75
F HARGA SATUAN PEKERJAAN (D+E) 7,549.75
9 A.4.1.2.9 1 bh Pemasangan dan Membuka Bekisting untuk Komponen Balok Beton Pracetak
A TENAGA 10,645.00
L.01 0.089 OH Pekerja 80,000.00 7,120.00
L.02 0.030 OH Tukang Batu 100,000.00 3,000.00
L.04 0.005 OH Mandor 105,000.00 525.00
B BAHAN -
C PERALATAN -
D JUMLAH A + B + C 10,645.00
E OVERHEAD & PROFIT (contoh 15%) 15% 1,596.75
F HARGA SATUAN PEKERJAAN (D+E) 12,241.75
10 A.4.1.2.10 1 bh Pemasangan dan Membuka Bekisting untuk Komponen Kolom Beton Pracetak
A TENAGA 8,605.00
L.01 0.071 OH Pekerja 80,000.00 5,680.00
L.02 0.024 OH Tukang Batu 100,000.00 2,400.00
L.04 0.005 OH Mandor 105,000.00 525.00
B BAHAN -
C PERALATAN -
D JUMLAH A + B + C 8,605.00

HALAMAN 87 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

E OVERHEAD & PROFIT (contoh 15%) 15% 1,290.75


F HARGA SATUAN PEKERJAAN (D+E) 9,895.75
11 A.4.1.2.11 1 m3 Penuangan / Menebar Beton untuk Komponen Plat Pracetak
A TENAGA 53,555.00
L.01 0.064 OH Pekerja 80,000.00 5,120.00
L.02 0.244 OH Tukang Batu 100,000.00 24,400.00
L.02 0.128 OH Tukang Vibrator 100,000.00 12,800.00
L.03 0.034 OH Kapala Tukang 105,000.00 3,570.00
L.04 0.073 OH Mandor 105,000.00 7,665.00

HALAMAN 88 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

B BAHAN -
C PERALATAN -
D JUMLAH A + B + C 53,555.00
E OVERHEAD & PROFIT (contoh 15%) 15% 8,033.25
F HARGA SATUAN PEKERJAAN (D+E) 61,588.25
12 A.4.1.2.12 1 m3 Penuangan / Menebar Beton untuk Komponen Plat Pracetak
A TENAGA 55,070.00
L.01 0.069 OH Pekerja 80,000.00 5,520.00
L.02 0.242 OH Tukang Batu 100,000.00 24,200.00
L.02 0.138 OH Tukang Vibrator 100,000.00 13,800.00
L.03 0.037 OH Kapala Tukang 105,000.00 3,885.00
L.04 0.073 OH Mandor 105,000.00 7,665.00
B BAHAN -
C PERALATAN -
D JUMLAH A + B + C 55,070.00
E OVERHEAD & PROFIT (contoh 15%) 15% 8,260.50
F HARGA SATUAN PEKERJAAN (D+E) 63,330.50
13 A.4.1.2.13 1 m3 Penuangan / Menebar Beton untuk Komponen Kolom Pracetak
A TENAGA 49,510.00
L.01 0.061 OH Pekerja 80,000.00 4,880.00
L.02 0.213 OH Tukang Batu 100,000.00 21,300.00
L.02 0.122 OH Tukang Vibrator 100,000.00 12,200.00
L.03 0.033 OH Kapala Tukang 105,000.00 3,465.00
L.04 0.073 OH Mandor 105,000.00 7,665.00
B BAHAN -
C PERALATAN -
D JUMLAH A + B + C 49,510.00
E OVERHEAD & PROFIT (contoh 15%) 15% 7,426.50
F HARGA SATUAN PEKERJAAN (D+E) 56,936.50
14 A.4.1.2.14 1 bh Ereksi Komponen Untuk Plat Pracetak
A TENAGA 51,925.00
L.08 0.067 OH Operator Crane 105,000.00 7,035.00
L.09 0.067 OH Pembantu Operator Crane 80,000.00 5,360.00
L.01 0.067 OH Pekerja 80,000.00 5,360.00
L.02 0.067 OH Tukang Batu 100,000.00 6,700.00
L.02 0.134 OH Tukang Erection 100,000.00 13,400.00
L.03 0.067 OH Kepala Tukang 105,000.00 7,035.00
L.04 0.067 OH Mandor 105,000.00 7,035.00
B BAHAN -
6.676 Ltr Solar -
C PERALATAN 231,287.71
0.536 Unit/hr Sewa Crane 428,428.57 229,637.71
8.800 bh/hr Sewa Pipe Suport 187.50 1,650.00
D JUMLAH A + B + C 283,212.71
E OVERHEAD & PROFIT (contoh 15%) 15% 42,481.91
F HARGA SATUAN PEKERJAAN (D+E) 325,694.62

HALAMAN 89 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

Indek Kenaikan Lantai Ereksi Komponen untuk Plat Pracetak


Indeks Kenaikan Lantai Indeks Kenaikan
Lantai Lantai
Ereksi Plat Lantai Ereksi Plat
1.000 1.0000 13 1.114
2.000 1.0000 14 1.134
3.000 1.0000 15 1.155
4.000 1.0000 16 1.176
5.000 1.0000 17 1.197
6.000 1.0000 18 1.219
7.000 1.0000 19 1.241
8.000 1.0180 20 1.264
9.000 1.0370 21 1.287
10.000 1.0550 22 1.310
11.000 1.0750 23 1.334
12.000 1.0940 24 1.358

15 A.4.1.2.15 1 bh Ereksi Komponen Untuk Balok Pracetak


A TENAGA 47,275.00
L.08 0.061 OH Operator Crane 105,000.00 6,405.00
L.09 0.061 OH Pembantu Operator Crane 80,000.00 4,880.00
L.01 0.061 OH Pekerja 80,000.00 4,880.00
L.02 0.061 OH Tukang Batu 100,000.00 6,100.00
L.02 0.122 OH Tukang Erection 100,000.00 12,200.00
L.03 0.061 OH Kepala Tukang 105,000.00 6,405.00
L.04 0.061 OH Mandor 105,000.00 6,405.00
B BAHAN -
6.110 Ltr Solar -
C PERALATAN 231,287.71
0.536 Unit/hr Sewa Crane 428,428.57 229,637.71
8.800 bh/hr Sewa Pipe Suport 187.50 1,650.00
D JUMLAH A + B + C 278,562.71
E OVERHEAD & PROFIT (contoh 15%) 15% 41,784.41
F HARGA SATUAN PEKERJAAN (D+E) 320,347.12

Indek Kenaikan Lantai Ereksi Komponen untuk Balok Pracetak


Indeks Kenaikan Lantai Indeks Kenaikan
Lantai Lantai
Ereksi Plat Lantai Ereksi Plat
1.000 1.0000 13 1.068
2.000 1.0000 14 1.080
3.000 1.0000 15 1.092
4.000 1.0000 16 1.104
5.000 1.0000 17 1.116
6.000 1.0000 18 1.129
7.000 1.0000 19 1.141
8.000 1.0110 20 1.154
9.000 1.0220 21 1.166
10.000 1.0340 22 1.179
11.000 1.0450 23 1.192

HALAMAN 90 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

12.000 1.0570 24 1.206

16 A.4.1.2.16 1 bh Ereksi Komponen Untuk Kolom Pracetak


A TENAGA 64,325.00
L.08 0.083 OH Operator Crane 105,000.00 8,715.00
L.09 0.083 OH Pembantu Operator Crane 80,000.00 6,640.00
L.01 0.083 OH Pekerja 80,000.00 6,640.00
L.02 0.083 OH Tukang Batu 100,000.00 8,300.00
L.02 0.166 OH Tukang Erection 100,000.00 16,600.00
L.03 0.083 OH Kepala Tukang 105,000.00 8,715.00

HALAMAN 91 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

L.04 0.083 OH Mandor 105,000.00 8,715.00


B BAHAN 86,908.50
8.277 Ltr Solar 10,500.00 86,908.50
C PERALATAN 287,776.57
0.664 Unit/hr Sewa Crane 428,428.57 284,476.57
17.600 bh/hr Sewa Pipe Suport 187.50 3,300.00
D JUMLAH A + B + C 439,010.07
E OVERHEAD & PROFIT (contoh 15%) 15% 65,851.51
F HARGA SATUAN PEKERJAAN (D+E) 504,861.58

Indek Kenaikan Lantai Ereksi Komponen untuk Balok Pracetak


Indeks Kenaikan Lantai Indeks Kenaikan
Lantai Lantai
Ereksi Plat Lantai Ereksi Plat
1.000 1.0000 13 1.162
2.000 1.0000 14 1.191
3.000 1.0000 15 1.221
4.000 1.0000 16 1.252
5.000 1.0000 17 1.284
6.000 1.0000 18 1.318
7.000 1.0000 19 1.350
8.000 1.0250 20 1.384
9.000 1.0510 21 1.419
10.000 1.0780 22 1.455
11.000 1.1050 23 1.492
12.000 1.1330 24 1.530

17 A.4.1.2.17 1 bh Langsiran Komponen untuk Plat Pracetak (± 20 m)


A TENAGA 30,295.00
L.08 0.083 OH Operator Crane 105,000.00 8,715.00
L.09 0.083 OH Pembantu Operator Crane 80,000.00 6,640.00
L.01 0.083 OH Pekerja 80,000.00 6,640.00
L.02 0.083 OH Tukang Batu 100,000.00 8,300.00
B BAHAN 19,918.50
1.897 Ltr Solar 10,500.00 19,918.50
C PERALATAN 65,121.14
0.152 Unit/hr Sewa Crane 428,428.57 65,121.14
D JUMLAH A + B + C 115,334.64
E OVERHEAD & PROFIT (contoh 15%) 15% 17,300.20
F HARGA SATUAN PEKERJAAN (D+E) 132,634.84
18 A.4.1.2.18 1 bh Langsiran Komponen untuk Balok Pracetak (± 20 m)
A TENAGA 8,835.00
L.08 0.019 OH Operator Crane 105,000.00 1,995.00
L.09 0.019 OH Pembantu Operator Crane 80,000.00 1,520.00
L.01 0.019 OH Pekerja 80,000.00 1,520.00
L.02 0.038 OH Tukang Batu 100,000.00 3,800.00
B BAHAN 19,918.50
1.897 Ltr Solar 10,500.00 19,918.50
C PERALATAN 65,121.14
0.152 Unit/hr Sewa Crane 428,428.57 65,121.14

HALAMAN 92 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

D JUMLAH A + B + C 93,874.64
E OVERHEAD & PROFIT (contoh 15%) 15% 14,081.20
F HARGA SATUAN PEKERJAAN (D+E) 107,955.84
19 A.4.1.2.19 1 bh Langsiran Komponen untuk Kolom Pracetak (± 20 m)
A TENAGA 8,835.00
L.08 0.019 OH Operator Crane 105,000.00 1,995.00
L.09 0.019 OH Pembantu Operator Crane 80,000.00 1,520.00
L.01 0.019 OH Pekerja 80,000.00 1,520.00
L.02 0.038 OH Tukang Batu 100,000.00 3,800.00

HALAMAN 93 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

B BAHAN 19,918.50
1.897 Ltr Solar 10,500.00 19,918.50
C PERALATAN 65,121.14
0.152 Unit/hr Sewa Crane 428,428.57 65,121.14
D JUMLAH A + B + C 93,874.64
E OVERHEAD & PROFIT (contoh 15%) 15% 14,081.20
F HARGA SATUAN PEKERJAAN (D+E) 107,955.84
20 A.4.1.2.20 1 m3 Bahan Grout Campuran
A TENAGA -
B BAHAN 22,439,125.00
1,200.000 Kg Semen Grout 3,925.00 4,710,000.00
650.000 kg Screening 352.50 229,125.00
350.000 Ltr Air 50,000.00 17,500,000.00
C PERALATAN -
D JUMLAH A + B + C 22,439,125.00
E OVERHEAD & PROFIT (contoh 15%) 15% 3,365,868.75
F HARGA SATUAN PEKERJAAN (D+E) 25,804,993.75
21 A.4.1.2.21 1 m3 BAHAN Grout Campuran (tidak Campuran)
A TENAGA -
B BAHAN 27,261,250.00
1,850.000 Kg Semen Grout 3,925.00 7,261,250.00
400.000 Ltr Air 50,000.00 20,000,000.00
C PERALATAN -
D JUMLAH A + B + C 27,261,250.00
E OVERHEAD & PROFIT (contoh 15%) 15% 4,089,187.50
F HARGA SATUAN PEKERJAAN (D+E) 31,350,437.50
22 A.4.1.2.22 1 ttk Upah Pekerjaan Gruot pada Joint Beton Pra Cetak
A TENAGA 48,355.00
L.02 0.367 OH Tukang Batu 100,000.00 36,700.00
L.03 0.074 OH Kepala Tukang 105,000.00 7,770.00
L.04 0.037 OH Mandor 105,000.00 3,885.00
B BAHAN -
C PERALATAN -
D JUMLAH A + B + C 48,355.00
E OVERHEAD & PROFIT (contoh 15%) 15% 7,253.25
F HARGA SATUAN PEKERJAAN (D+E) 55,608.25
23 A.4.1.2.23 1 ttk Pemasangan Bekisting Joint Pra Cetak
A TENAGA 28,560.00
L.01 0.147 OH Pekerja 80,000.00 11,760.00
L.02 0.147 OH Tukang Batu 100,000.00 14,700.00
L.03 0.015 OH Kepala Tukang 105,000.00 1,575.00
L.04 0.005 OH Mandor 105,000.00 525.00
B BAHAN 41,944.00
0.012 m3 Kayu Kaso 5/7 (lokal) 2,100,000.00 25,200.00
0.004 m3 Papan Cor (papan cetak pinus) 2,800,000.00 11,200.00
0.264 Kg Paku (5 s/d 7) cm 21,000.00 5,544.00
C PERALATAN -
D JUMLAH A + B + C 70,504.00
E OVERHEAD & PROFIT (contoh 15%) 15% 10,575.60

HALAMAN 94 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

F HARGA SATUAN PEKERJAAN (D+E) 81,079.60


24 A.4.1.2.24 1 ttk Upah Pemasangan Joint dengan Sling
A TENAGA 42,955.00
L.01 0.220 OH Pekerja 80,000.00 17,600.00
L.02 0.022 OH Tukang Batu 100,000.00 2,200.00
L.02 0.220 OH Tukang Besi 100,000.00 22,000.00
L.04 0.011 OH Mandor 105,000.00 1,155.00

HALAMAN 95 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

B BAHAN -
C PERALATAN -
D JUMLAH A + B + C 42,955.00
E OVERHEAD & PROFIT (contoh 15%) 15% 6,443.25
F HARGA SATUAN PEKERJAAN (D+E) 49,398.25
V A.4.2.1 HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM
1 A.4.2.1.1 1 Kg Pemasangan Besi Profil
A TENAGA 11,745.00
L.01 0.060 OH Pekerja 80,000.00 4,800.00
L.02 0.060 OH Tukang Besi 100,000.00 6,000.00
L.03 0.006 OH Kepala Tukang 105,000.00 630.00
L.04 0.003 OH Mandor 105,000.00 315.00
B BAHAN 17,250.00
1.150 Kg Besi Profil 15,000.00 17,250.00
C PERALATAN -
D JUMLAH A + B + C 28,995.00
E OVERHEAD & PROFIT (contoh 15%) 15% 4,349.25
F HARGA SATUAN PEKERJAAN (D+E) 33,344.25
2 A.4.2.1.2 1 Kg Pemasangan Rangka Kuda-kuda Baja IWF
A TENAGA 11,745.00
L.01 0.060 OH Pekerja 80,000.00 4,800.00
L.02 0.060 OH Tukang Besi 100,000.00 6,000.00
L.03 0.006 OH Kepala Tukang 105,000.00 630.00
L.04 0.003 OH Mandor 105,000.00 315.00
B BAHAN 17,250.00
1.150 kg Besi Baja IWF 15,000.00 17,250.00
C PERALATAN -
D JUMLAH A + B + C 28,995.00
E OVERHEAD & PROFIT (contoh 15%) 15% 4,349.25
F HARGA SATUAN PEKERJAAN (D+E) 33,344.25
3 A.4.2.1.3 100 kg Pengerjaan Pekerjaan Perakitan (Kuda-kuda Baja)
A TENAGA 18,630.00
L.01 0.100 OH Pekerja 80,000.00 8,000.00
L.02 0.100 OH Tukang Besi 100,000.00 10,000.00
L.03 0.001 OH Kepala Tukang 105,000.00 105.00
L.04 0.005 OH Mandor 105,000.00 525.00
B BAHAN 13,500.00
1.000 ltr Solar 10,500.00 10,500.00
0.100 ltr Minyak Pelumas 30,000.00 3,000.00
C PERALATAN -
0.800 jam Sewa Alat - -
D JUMLAH A + B + C 32,130.00
E OVERHEAD & PROFIT (contoh 15%) 15% 4,819.50
F HARGA SATUAN PEKERJAAN (D+E) 36,949.50
4 A.4.2.1.4 1 m2 Pembuatan Pintu Besi Plat Baja tebal 2 mm rangkap, rangka baja Siku
A TENAGA 205,485.00
L.01 1.050 OH Pekerja 80,000.00 84,000.00
L.02 1.050 OH Tukang Besi 100,000.00 105,000.00
L.03 0.105 OH Kepala Tukang 105,000.00 11,025.00

HALAMAN 96 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

L.04 0.052 OH Mandor 105,000.00 5,460.00


B BAHAN 720,000.00
15.000 Kg Besi Siku L.30.30.3 15,000.00 225,000.00
32.800 Kg Besi Plat Baja 15,000.00 492,000.00
0.050 Kg Kawat Las 60,000.00 3,000.00
C PERALATAN -
D JUMLAH A + B + C 925,485.00
E OVERHEAD & PROFIT (contoh 15%) 15% 138,822.75
F HARGA SATUAN PEKERJAAN (D+E) 1,064,307.75

HALAMAN 97 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

5 A.4.2.1.5 10 cm Pengerjaan Pengelasan dengan Las Listrik


A TENAGA 5,620.00
L.01 0.040 OH Pekerja 80,000.00 3,200.00
L.02 0.020 OH Tukang Besi 100,000.00 2,000.00
L.03 0.002 OH Kepala Tukang 105,000.00 210.00
L.04 0.002 OH Mandor 105,000.00 210.00
B BAHAN 2,835.00
0.040 kg Kawat Las 60,000.00 2,400.00
0.030 ltr Solar 10,500.00 315.00
0.004 ltr Minyak Pelumas 30,000.00 120.00
C PERALATAN 5,755.11
0.170 jam Sewa Alat las 33,853.57 5,755.11
D JUMLAH A + B + C 14,210.11
E OVERHEAD & PROFIT (contoh 15%) 15% 2,131.52
F HARGA SATUAN PEKERJAAN (D+E) 16,341.62
6 A.4.2.1.6 1 m2 Pembuatan Rangka Jendela Besi Scuare Tube
A TENAGA 127,185.00
L.01 0.650 OH Pekerja 80,000.00 52,000.00
L.02 0.650 OH Tukang Las Biasa 100,000.00 65,000.00
L.03 0.065 OH Kepala Tukang 105,000.00 6,825.00
L.04 0.032 OH Mandor 105,000.00 3,360.00
B BAHAN 928,972.46
4.760 m' Besi Scuare tube (holo 40.40.2) 31,500.00 149,940.00
4.522 m' Besi List Kaca 1 x 1 cm 100,000.00 452,200.00
20.000 cm Pengelasan (A.4.2.1.5) 16,341.62 326,832.46
C PERALATAN -
D JUMLAH A + B + C 1,056,157.46
E OVERHEAD & PROFIT (contoh 15%) 15% 158,423.62
F HARGA SATUAN PEKERJAAN (D+E) 1,214,581.08
7 A.4.2.1.7 1 m2 Pemasangan Pintu Rolling Door Besi
A TENAGA 229,230.00
L.01 1.200 OH Pekerja 80,000.00 96,000.00
L.02 1.200 OH Tukang Besi 100,000.00 120,000.00
L.03 0.120 OH Kepala Tukang 105,000.00 12,600.00
L.04 0.006 OH Mandor 105,000.00 630.00
B BAHAN 325,000.00
1.000 m2 Pintu Gulung Besi 325,000.00 325,000.00
C PERALATAN -
D JUMLAH A + B + C 554,230.00
E OVERHEAD & PROFIT (contoh 15%) 15% 83,134.50
F HARGA SATUAN PEKERJAAN (D+E) 637,364.50
8 A.4.2.1.8 1 m2 Pemasangan Pintu Lipat (Folding Door)
A TENAGA 86,130.00
L.01 0.440 OH Pekerja 80,000.00 35,200.00
L.02 0.440 OH Tukang Besi 100,000.00 44,000.00
L.03 0.044 OH Kepala Tukang 105,000.00 4,620.00
L.04 0.022 OH Mandor 105,000.00 2,310.00
B BAHAN 40,000.00
1.000 m2 Pintu Lipat 40,000.00 40,000.00

HALAMAN 98 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

C PERALATAN -
D JUMLAH A + B + C 126,130.00
E OVERHEAD & PROFIT (contoh 15%) 15% 18,919.50
F HARGA SATUAN PEKERJAAN (D+E) 145,049.50
9 A.4.2.1.9 1 m2 Pemasangan Sunscreen Allumunium
A TENAGA 95,220.00
L.01 0.080 OH Pekerja 80,000.00 6,400.00
L.02 0.800 OH Tukang Besi 100,000.00 80,000.00
L.03 0.080 OH Kepala Tukang 105,000.00 8,400.00
L.04 0.004 OH Mandor 105,000.00 420.00

HALAMAN 99 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

B BAHAN 30,000.00
1.000 m2 Sunscreen Allumunium 30,000.00 30,000.00
C PERALATAN -
D JUMLAH A + B + C 125,220.00
E OVERHEAD & PROFIT (contoh 15%) 15% 18,783.00
F HARGA SATUAN PEKERJAAN (D+E) 144,003.00
10 A.4.2.1.10 1 m2 Pemasangan Rolling Door Allumunium
A TENAGA 195,750.00
L.01 1.000 OH Pekerja 80,000.00 80,000.00
L.02 1.000 OH Tukang Besi 100,000.00 100,000.00
L.03 0.100 OH Kepala Tukang 105,000.00 10,500.00
L.04 0.050 OH Mandor 105,000.00 5,250.00
B BAHAN 375,000.00
1.000 m2 Rolling Allumunium 375,000.00 375,000.00
C PERALATAN -
D JUMLAH A + B + C 570,750.00
E OVERHEAD & PROFIT (contoh 15%) 15% 85,612.50
F HARGA SATUAN PEKERJAAN (D+E) 656,362.50
11 A.4.2.1.11 1 m' Pemasangan Kusen Pintu Allumunium (4" silver ex. Alexindo)
A TENAGA 8,412.00
L.01 0.043 OH Pekerja 80,000.00 3,440.00
L.02 0.043 OH Tukang Besi 100,000.00 4,300.00
L.03 0.004 OH Kepala Tukang 105,000.00 451.50
L.04 0.002 OH Mandor 105,000.00 220.50
B BAHAN 111,350.00
1.100 m' Profil Allumunium 96,500.00 106,150.00
2.000 buah Skrup Fixer 800.00 1,600.00
0.060 Tube Sealant 60,000.00 3,600.00
C PERALATAN -
D JUMLAH A + B + C 119,762.00
E OVERHEAD & PROFIT (contoh 15%) 15% 17,964.30
F HARGA SATUAN PEKERJAAN (D+E) 137,726.30
12 A.4.2.1.12 1 m2 Pemasangan Pintu Allumunium Strip Lebar 8 cm (4" silver ex. Alexindo)
A TENAGA 16,633.50
L.01 0.085 OH Pekerja 80,000.00 6,800.00
L.02 0.085 OH Tukang Besi 100,000.00 8,500.00
L.03 0.009 OH Kepala Tukang 105,000.00 892.50
L.04 0.004 OH Mandor 105,000.00 441.00
B BAHAN 833,400.00
4.400 m' Profil Allumunium 96,500.00 424,600.00
14.600 m' Allumunium Strip 28,000.00 408,800.00
C PERALATAN -
D JUMLAH A + B + C 850,033.50
E OVERHEAD & PROFIT (contoh 15%) 15% 127,505.03
F HARGA SATUAN PEKERJAAN (D+E) 977,538.53
13 A.4.2.1.13 1 m2 Pemasangan Pintu Kaca Rangka Allumunium
A TENAGA 16,770.00
L.01 0.085 OH Pekerja 80,000.00 6,800.00
L.02 0.085 OH Tukang Besi 100,000.00 8,500.00

HALAMAN 100 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

L.03 0.009 OH Kepala Tukang 105,000.00 945.00


L.04 0.005 OH Mandor 105,000.00 525.00
B BAHAN 478,850.00
4.400 m' Pintu Allumunium 98,500.00 433,400.00
4.500 m' Profil Kaca 6,500.00 29,250.00
0.270 tube Sealant 60,000.00 16,200.00
C PERALATAN -
D JUMLAH A + B + C 495,620.00
E OVERHEAD & PROFIT (contoh 15%) 15% 74,343.00
F HARGA SATUAN PEKERJAAN (D+E) 569,963.00

HALAMAN 101 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

14 A.4.2.1.14 1 m2 Pemasangan Venetions Blinds & Vertical Blinds


A TENAGA 68,565.00
L.01 0.350 OH Pekerja 80,000.00 28,000.00
L.02 0.350 OH Tukang Besi 100,000.00 35,000.00
L.03 0.035 OH Kepala Tukang 105,000.00 3,675.00
L.04 0.018 OH Mandor 105,000.00 1,890.00
B BAHAN 50,000.00
1.000 m2 Venetions Blinds atau Vertical Blinds (tirai) 50,000.00 50,000.00
C PERALATAN -
D JUMLAH A + B + C 118,565.00
E OVERHEAD & PROFIT (contoh 15%) 15% 17,784.75
F HARGA SATUAN PEKERJAAN (D+E) 136,349.75
15 A.4.2.1.15 1 m2 Pemasangan Teralis Besi Strip (2x3) cm
A TENAGA 326,850.00
L.01 1.670 OH Pekerja 80,000.00 133,600.00
L.02 1.670 OH Tukang Las 100,000.00 167,000.00
L.03 0.167 OH Kepala Tukang 105,000.00 17,535.00
L.04 0.083 OH Mandor 105,000.00 8,715.00
B BAHAN 136,908.12
6.177 kg Besi Strip 15,000.00 92,655.00
27.080 cm Pengelasan (15% x A.4.2.1.5) 1,634.16 44,253.12
C PERALATAN -
D JUMLAH A + B + C 463,758.12
E OVERHEAD & PROFIT (contoh 15%) 15% 69,563.72
F HARGA SATUAN PEKERJAAN (D+E) 533,321.83
16 A.4.2.1.16 1 m2 Pemasangan Kawat Nyamuk
A TENAGA 19,575.00
L.01 0.100 OH Pekerja 80,000.00 8,000.00
L.02 0.100 OH Tukang kayu 100,000.00 10,000.00
L.03 0.010 OH Kepala Tukang 105,000.00 1,050.00
L.04 0.005 OH Mandor 105,000.00 525.00
B BAHAN 54,895.54
1.100 m2 Kawat Nyamuk nylon 10,000.00 11,000.00
11.110 cm Pengelasan (A.4.2.1.5 x 15%) 1,634.16 18,155.54
1.716 kg Baja Strip (0,2x2) cm 15,000.00 25,740.00
C PERALATAN -
D JUMLAH A + B + C 74,470.54
E OVERHEAD & PROFIT (contoh 15%) 15% 11,170.58
F HARGA SATUAN PEKERJAAN (D+E) 85,641.12
17 A.4.2.1.17 1 m2 Pemasangan Jendela Nako & Tralis
A TENAGA 38,205.00
L.01 0.200 OH Pekerja 80,000.00 16,000.00
L.02 0.200 OH Tukang Kayu 100,000.00 20,000.00
L.03 0.020 OH Kepala Tukang 105,000.00 2,100.00
L.04 0.001 OH Mandor 105,000.00 105.00
B BAHAN 91,600.00
1.100 m2 Jendela Nako 41,000.00 45,100.00
10.000 buah Paku Skrup 1 - 2,5 cm 800.00 8,000.00
7.000 m' Besi Strip 5,500.00 38,500.00

HALAMAN 102 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

C PERALATAN -
D JUMLAH A + B + C 129,805.00
E OVERHEAD & PROFIT (contoh 15%) 15% 19,470.75
F HARGA SATUAN PEKERJAAN (D+E) 149,275.75
18 A.4.2.1.18 1 m' Pemasangan Talang Datar / Jurai , Seng BJLS 20 Lebar 90 cm
A TENAGA 59,675.00
L.01 0.200 OH Pekerja 80,000.00 16,000.00
L.02 0.400 OH Tukang Kayu 100,000.00 40,000.00
L.03 0.025 OH Kepala Tukang 105,000.00 2,625.00
L.04 0.010 OH Mandor 105,000.00 1,050.00

HALAMAN 103 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

B BAHAN 121,685.00
1.050 m1 Seng Plaat BJLS 20 30,000.00 31,500.00
0.015 Kg Paku Biasa 1 - 2,5 cm 21,000.00 315.00
0.019 m3 Kayu Papan kruing 4,730,000.00 89,870.00
C PERALATAN -
D JUMLAH A + B + C 181,360.00
E OVERHEAD & PROFIT (contoh 15%) 15% 27,204.00
F HARGA SATUAN PEKERJAAN (D+E) 208,564.00
19 A.4.2.1.19 1 m' Pemasangan Talang 1/2 Lingkaran Ø 15 cm, Seng Plaat BJLS 30 Lebar 45 cm
A TENAGA 38,205.00
L.01 0.200 OH Pekerja 80,000.00 16,000.00
L.02 0.200 OH Tukang Kayu 100,000.00 20,000.00
L.03 0.020 OH Kepala Tukang 105,000.00 2,100.00
L.04 0.001 OH Mandor 105,000.00 105.00
B BAHAN 65,460.00
1.050 m1 Seng Plaat BJLS 30 55,000.00 57,750.00
0.010 Kg Paku Biasa 1 - 2,5 cm 21,000.00 210.00
0.500 Kg Besi strip 15,000.00 7,500.00
C PERALATAN -
D JUMLAH A + B + C 103,665.00
E OVERHEAD & PROFIT (contoh 15%) 15% 15,549.75
F HARGA SATUAN PEKERJAAN (D+E) 119,214.75
19 A.4.2.1.19a 1 m' Pemasangan Talang 1/2 Lingkaran Ø 15 cm, Seng Plaat BJLS 30 Lebar 90 cm
A TENAGA 38,205.00
L.01 0.200 OH Pekerja 80,000.00 16,000.00
L.02 0.200 OH Tukang Kayu 100,000.00 20,000.00
L.03 0.020 OH Kepala Tukang 105,000.00 2,100.00
L.04 0.001 OH Mandor 105,000.00 105.00
B BAHAN 130,920.00
2.100 m1 Seng Plaat BJLS 30 55,000.00 115,500.00
0.020 Kg Paku Biasa 1 - 2,5 cm 21,000.00 420.00
1.000 Kg Besi strip 15,000.00 15,000.00
C PERALATAN -
D JUMLAH A + B + C 169,125.00
E OVERHEAD & PROFIT (contoh 15%) 15% 25,368.75
F HARGA SATUAN PEKERJAAN (D+E) 194,493.75
20 A.4.2.1.20 1 m2 Pemasangan Rangka Besi Hollow 1 x 40.40.2mm; Modul 60x120 cm dinding partisi
A TENAGA 48,990.00
L.01 0.250 OH Pekerja 80,000.00 20,000.00
L.02 0.250 OH Tukang Besi 100,000.00 25,000.00
L.03 0.025 OH Kepala Tukang 105,000.00 2,625.00
L.04 0.013 OH Mandor 105,000.00 1,365.00
B BAHAN 220,500.00
3.500 m' Rangka metal hollow 40.40.2 mm 31,500.00 110,250.00
1.000 **) Assesoris (perkuatan; las dll) 110,250.00 110,250.00
**) 100% x rangka
C PERALATAN -
D JUMLAH A + B + C 269,490.00
E OVERHEAD & PROFIT (contoh 15%) 15% 40,423.50

HALAMAN 104 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

F HARGA SATUAN PEKERJAAN (D+E) 309,913.50


21 A.4.2.1.21 1 m2 Pemasangan Rangka Besi Hollow 1 x 36.36.0,3 mm; Modul 60x60 cm dinding plafond
A TENAGA 68,565.00
L.01 0.350 OH Pekerja 80,000.00 28,000.00
L.02 0.350 OH Tukang Besi 100,000.00 35,000.00
L.03 0.035 OH Kepala Tukang 105,000.00 3,675.00
L.04 0.018 OH Mandor 105,000.00 1,890.00

HALAMAN 105 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

B BAHAN 168,000.00
4.000 m' Rangka metal hollow 36.36.0,3 mm 21,000.00 84,000.00
1.000 **) Assesoris (perkuatan, dll) 84,000.00 84,000.00
**) 100% x rangka
C PERALATAN -
D JUMLAH A + B + C 236,565.00
E OVERHEAD & PROFIT (contoh 15%) 15% 35,484.75
F HARGA SATUAN PEKERJAAN (D+E) 272,049.75
22 A.4.2.1.22 1 m2 Pemasangan Atap Pelana Rangka Atap Baja Canal C dingin Profil C75
A TENAGA 143,670.00
L.01 0.734 OH Pekerja 80,000.00 58,720.00
L.02 0.734 OH Tukang Besi 100,000.00 73,400.00
L.03 0.073 OH Kepala Tukang 105,000.00 7,665.00
L.04 0.037 OH Mandor 105,000.00 3,885.00
B BAHAN 45,975.00
3.065 kg Baja Ringan Canal Dingin C75 15,000.00 45,975.00
C PERALATAN -
10.000 % Peralatan *) harga BAHAN 45,975.00 -
D JUMLAH A + B + C 189,645.00
E OVERHEAD & PROFIT (contoh 15%) 15% 28,446.75
F HARGA SATUAN PEKERJAAN (D+E) 218,091.75
23 A.4.2.1.23 1 m2 Pemasangan Atap Jurai Rangka Atap Baja Canal Dingin Profil C75
A TENAGA 148,842.00
L.01 0.760 OH Pekerja 80,000.00 60,832.00
L.02 0.760 OH Tukang Besi 100,000.00 76,040.00
L.03 0.076 OH Kepala Tukang 105,000.00 7,980.00
L.04 0.038 OH Mandor 105,000.00 3,990.00
B BAHAN 60,750.00
4.050 kg Baja Ringan Canal Dingin C75 15,000.00 60,750.00
C PERALATAN 6,075.00
10.000 % Peralatan *) harga BAHAN 60,750.00 6,075.00
D JUMLAH A + B + C 215,667.00
E OVERHEAD & PROFIT (contoh 15%) 15% 32,350.05
F HARGA SATUAN PEKERJAAN (D+E) 248,017.05
VI A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING
1 A.4.4.1.1 1 m2 Pemasangan Dinding Bata Merah ukuran (5x11x22) cm Tebal 1 bata Camp. 1SP: 2PP
A TENAGA 73,250.00
L.01 0.600 OH Pekerja 80,000.00 48,000.00
L.02 0.200 OH Tukang Batu 100,000.00 20,000.00
L.03 0.020 OH Kepala Tukang Batu 105,000.00 2,100.00
L.04 0.030 OH Mandor 105,000.00 3,150.00
B BAHAN 235,160.00
140.000 Buah Bata Merah 1,150.00 161,000.00
43.500 Kg Portland Semen (PC) 1,120.00 48,720.00
0.080 m3 Pasir Pasang (PP) 318,000.00 25,440.00
C PERALATAN -
D JUMLAH A + B + C 308,410.00
E OVERHEAD & PROFIT (contoh 15%) 15% 46,261.50
F HARGA SATUAN PEKERJAAN (D+E) 354,671.50

HALAMAN 106 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

2 A.4.4.1.2 1 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 3PP
A TENAGA 73,250.00
L.01 0.600 OH Pekerja 80,000.00 48,000.00
L.02 0.200 OH Tukang Batu 100,000.00 20,000.00
L.03 0.020 OH Kepala Tukang Batu 105,000.00 2,100.00
L.04 0.030 OH Mandor 105,000.00 3,150.00
B BAHAN 226,842.00
140.000 Buah Bata Merah 1,150.00 161,000.00
32.950 Kg Portland Semen (PC) 1,120.00 36,904.00
0.091 m3 Pasir Pasang (PP) 318,000.00 28,938.00

HALAMAN 107 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

C PERALATAN -
D JUMLAH A + B + C 300,092.00
E OVERHEAD & PROFIT (contoh 15%) 15% 45,013.80
F HARGA SATUAN PEKERJAAN (D+E) 345,105.80
3 A.4.4.1.3 1 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 4PP
A TENAGA 73,250.00
L.01 0.600 OH Pekerja 80,000.00 48,000.00
L.02 0.200 OH Tukang Batu 100,000.00 20,000.00
L.03 0.020 OH Kepala Tukang Batu 105,000.00 2,100.00
L.04 0.030 OH Mandor 105,000.00 3,150.00
B BAHAN 220,310.00
140.000 Buah Bata Merah 1,150.00 161,000.00
26.550 Kg Portland Semen (PC) 1,120.00 29,736.00
0.093 m3 Pasir Pasang (PP) 318,000.00 29,574.00
C PERALATAN -
D JUMLAH A + B + C 293,560.00
E OVERHEAD & PROFIT (contoh 15%) 15% 44,034.00
F HARGA SATUAN PEKERJAAN (D+E) 337,594.00
4 A.4.4.1.4 1 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 5PP
A TENAGA 73,250.00
L.01 0.600 OH Pekerja 80,000.00 48,000.00
L.02 0.200 OH Tukang Batu 100,000.00 20,000.00
L.03 0.020 OH Kepala Tukang Batu 105,000.00 2,100.00
L.04 0.030 OH Mandor 105,000.00 3,150.00
B BAHAN 218,300.00
140.000 Buah Bata Merah 1,150.00 161,000.00
22.200 Kg Portland Semen (PC) 1,120.00 24,864.00
0.102 m3 Pasir Pasang (PP) 318,000.00 32,436.00
C PERALATAN -
D JUMLAH A + B + C 291,550.00
E OVERHEAD & PROFIT (contoh 15%) 15% 43,732.50
F HARGA SATUAN PEKERJAAN (D+E) 335,282.50
5 A.4.4.1.5 1 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 6PP
A TENAGA 73,250.00
L.01 0.600 OH Pekerja 80,000.00 48,000.00
L.02 0.200 OH Tukang Batu 100,000.00 20,000.00
L.03 0.020 OH Kepala Tukang Batu 105,000.00 2,100.00
L.04 0.030 OH Mandor 105,000.00 3,150.00
B BAHAN 220,516.00
140.000 Buah Bata Merah 1,150.00 161,000.00
18.500 Kg Portland Semen (PC) 1,120.00 20,720.00
0.122 m3 Pasir Pasang (PP) 318,000.00 38,796.00
C PERALATAN -
D JUMLAH A + B + C 293,766.00
E OVERHEAD & PROFIT (contoh 15%) 15% 44,064.90
F HARGA SATUAN PEKERJAAN (D+E) 337,830.90
6 A.4.4.1.6 1 m2 Pemasangan Dinding Bata Merah Uk.(5x11x22) cm Tebal 1 Bata Camp. 1SP:3KP:10PP
A TENAGA 73,250.00
L.01 0.600 OH Pekerja 80,000.00 48,000.00

HALAMAN 108 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

L.02 0.200 OH Tukang Batu 100,000.00 20,000.00


L.03 0.020 OH Kepala Tukang Batu 105,000.00 2,100.00
L.04 0.030 OH Mandor 105,000.00 3,150.00
B BAHAN 207,204.60
140.000 Buah Bata Merah 1,150.00 161,000.00
10.080 Kg Portland Semen (PC) 1,120.00 11,289.60
0.093 m3 Pasir Pasang (PP) 318,000.00 29,415.00
0.028 m3 Kapur Pasang (KP) 200,000.00 5,500.00

HALAMAN 109 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

C PERALATAN -
D JUMLAH A + B + C 280,454.60
E OVERHEAD & PROFIT (contoh 15%) 15% 42,068.19
F HARGA SATUAN PEKERJAAN (D+E) 322,522.79
7 A.4.4.1.7 1 m2 Pemasangan Dinding Bata Merah Uk. (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 2PP
A TENAGA 36,625.00
L.01 0.300 OH Pekerja 80,000.00 24,000.00
L.02 0.100 OH Tukang Batu 100,000.00 10,000.00
L.03 0.010 OH Kepala Tukang 105,000.00 1,050.00
L.04 0.015 OH Mandor 105,000.00 1,575.00
B BAHAN 113,808.00
70.000 Buah Bata Merah 5 x 11 x 22 1,150.00 80,500.00
18.950 Kg Portland Semen 1,120.00 21,224.00
0.038 m3 Pasir Pasang 318,000.00 12,084.00
C PERALATAN -
D JUMLAH A + B + C 150,433.00
E OVERHEAD & PROFIT (contoh 15%) 15% 22,564.95
F HARGA SATUAN PEKERJAAN (D+E) 172,997.95
8 A.4.4.1.8 1 m2 Pemasangan Dinding Bata Merah Uk. (5x11x22)cm Tebal 1/2 Bata Camp. 1SP:3PP
A TENAGA 36,625.00
L.01 0.300 OH Pekerja 80,000.00 24,000.00
L.02 0.100 OH Tukang Batu 100,000.00 10,000.00
L.03 0.010 OH Kepala Tukang 105,000.00 1,050.00
L.04 0.015 OH Mandor 105,000.00 1,575.00
B BAHAN 109,314.40
70.000 Buah Bata Merah 5 x 11 x 22 1,150.00 80,500.00
14.370 Kg Portland Semen 1,120.00 16,094.40
0.040 m3 Pasir Pasang 318,000.00 12,720.00
C PERALATAN -
D JUMLAH A + B + C 145,939.40
E OVERHEAD & PROFIT (contoh 15%) 15% 21,890.91
F HARGA SATUAN PEKERJAAN (D+E) 167,830.31
9 A.4.4.1.9 1 m2 Pemasangan Dinding Bata Merah Uk.(5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 4PP
A TENAGA 36,625.00
L.01 0.300 OH Pekerja 80,000.00 24,000.00
L.02 0.100 OH Tukang Batu 100,000.00 10,000.00
L.03 0.010 OH Kepala Tukang 105,000.00 1,050.00
L.04 0.015 OH Mandor 105,000.00 1,575.00
B BAHAN 107,054.00
70.000 Buah Bata Merah 5 x 11 x 22 1,150.00 80,500.00
11.500 Kg Portland Semen 1,120.00 12,880.00
0.043 m3 Pasir Pasang 318,000.00 13,674.00
C PERALATAN -
D JUMLAH A + B + C 143,679.00
E OVERHEAD & PROFIT (contoh 15%) 15% 21,551.85
F HARGA SATUAN PEKERJAAN (D+E) 165,230.85
10 A.4.4.1.10 1 m2 Pemasangan Dinding Bata Merah Uk. (5x11x22)cm Tebal 1/2 Bata Camp. 1SP:5PP
A TENAGA 36,625.00
L.01 0.300 OH Pekerja 80,000.00 24,000.00

HALAMAN 110 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

L.02 0.100 OH Tukang Batu 100,000.00 10,000.00


L.03 0.010 OH Kepala Tukang 105,000.00 1,050.00
L.04 0.015 OH Mandor 105,000.00 1,575.00
B BAHAN 105,651.60
70.000 Buah Bata Merah 5 x 11 x 22 1,150.00 80,500.00
9.680 Kg Portland Semen 1,120.00 10,841.60
0.045 m3 Pasir Pasang 318,000.00 14,310.00

HALAMAN 111 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

C PERALATAN -
D JUMLAH A + B + C 142,276.60
E OVERHEAD & PROFIT (contoh 15%) 15% 21,341.49
F HARGA SATUAN PEKERJAAN (D+E) 163,618.09
11 A.4.4.1.11 1 m2 Pemasangan Dinding Bata Merah Uk.(5x11x22)cm Tebal 1/2 Bata Camp. 1SP:6PP
A TENAGA 36,625.00
L.01 0.300 OH Pekerja 80,000.00 24,000.00
L.02 0.100 OH Tukang Batu 100,000.00 10,000.00
L.03 0.010 OH Kepala Tukang 105,000.00 1,050.00
L.04 0.015 OH Mandor 105,000.00 1,575.00
B BAHAN 105,400.40
70.000 Buah Bata Merah 5 x 11 x 22 1,150.00 80,500.00
8.320 Kg Portland Semen 1,120.00 9,318.40
0.049 m3 Pasir Pasang 318,000.00 15,582.00
C PERALATAN -
D JUMLAH A + B + C 142,025.40
E OVERHEAD & PROFIT (contoh 15%) 15% 21,303.81
F HARGA SATUAN PEKERJAAN (D+E) 163,329.21
12 A.4.4.1.12 1 m2 Pemasangan Dinding Bata Merah Uk. (5x11x22)cm Tebal 1/2 Bata Camp. 1SP:8PP
A TENAGA 36,625.00
L.01 0.300 OH Pekerja 80,000.00 24,000.00
L.02 0.100 OH Tukang Batu 100,000.00 10,000.00
L.03 0.010 OH Kepala Tukang 105,000.00 1,050.00
L.04 0.015 OH Mandor 105,000.00 1,575.00
B BAHAN 103,680.00
70.000 Buah Bata Merah 5 x 11 x 22 1,150.00 80,500.00
6.500 Kg Portland Semen 1,120.00 7,280.00
0.050 m3 Pasir Pasang 318,000.00 15,900.00
C PERALATAN -
D JUMLAH A + B + C 140,305.00
E OVERHEAD & PROFIT (contoh 15%) 15% 21,045.75
F HARGA SATUAN PEKERJAAN (D+E) 161,350.75
13 A.4.4.1.13 1 m2 Pemasangan Dinding Bata Merah Uk.(5x11x22)cm Tbl 1/2 Bata Camp.1SP:3KP:10PP
A TENAGA 36,625.00
L.01 0.300 OH Pekerja 80,000.00 24,000.00
L.02 0.100 OH Tukang Batu 100,000.00 10,000.00
L.03 0.010 OH Kepala Tukang 105,000.00 1,050.00
L.04 0.015 OH Mandor 105,000.00 1,575.00
B BAHAN 104,440.00
70.000 Buah Bata Merah 5 x 11 x 22 1,150.00 80,500.00
4.500 Kg Portland Semen 1,120.00 5,040.00
0.050 m3 Pasir Pasang 318,000.00 15,900.00
0.015 m3 Kapur Padam 200,000.00 3,000.00
C PERALATAN -
D JUMLAH A + B + C 141,065.00
E OVERHEAD & PROFIT (contoh 15%) 15% 21,159.75
F HARGA SATUAN PEKERJAAN (D+E) 162,224.75
14 A.4.4.1.14 1 m2 Pemasangan Dinding Bata Merah Uk.(5x11x22)cm Tebal 1/2 Bata Camp.1SP:1KP:1PP
A TENAGA 36,625.00

HALAMAN 112 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

L.01 0.300 OH Pekerja 80,000.00 24,000.00


L.02 0.100 OH Tukang Batu 100,000.00 10,000.00
L.03 0.010 OH Kepala Tukang 105,000.00 1,050.00
L.04 0.015 OH Mandor 105,000.00 1,575.00
B BAHAN 89,844.16
70.000 Buah Bata Merah 5 x 11 x 22 1,150.00 80,500.00
0.018 m3 Semen Merah 1,120.00 20.16
0.018 m3 Pasir Pasang 318,000.00 5,724.00
0.018 m3 Kapur Padam 200,000.00 3,600.00

HALAMAN 113 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

C PERALATAN -
D JUMLAH A + B + C 126,469.16
E OVERHEAD & PROFIT (contoh 15%) 15% 18,970.37
F HARGA SATUAN PEKERJAAN (D+E) 145,439.53
15 A.4.4.1.15 1 m2 Pemasangan Dinding Bata Merah Uk.(5x11x22)cm Tbl 1/2 Bata Camp.1SM:1KP:2PP
A TENAGA 36,625.00
L.01 0.300 OH Pekerja 80,000.00 24,000.00
L.02 0.100 OH Tukang Batu 100,000.00 10,000.00
L.03 0.010 OH Kepala Tukang 105,000.00 1,050.00
L.04 0.015 OH Mandor 105,000.00 1,575.00
B BAHAN 92,219.68
70.000 Buah Bata Merah 5 x 11 x 22 1,150.00 80,500.00
0.014 m3 Semen Merah 1,120.00 15.68
0.028 m3 Pasir Pasang 318,000.00 8,904.00
0.014 m3 Kapur Padam 200,000.00 2,800.00
C PERALATAN -
D JUMLAH A + B + C 128,844.68
E OVERHEAD & PROFIT (contoh 15%) 15% 19,326.70
F HARGA SATUAN PEKERJAAN (D+E) 148,171.38
16 A.4.4.1.16 1 m2 Pemasangan Dinding HB/CB 20, speci camp. 1SP : 3PP
A TENAGA 46,465.00
L.01 0.350 OH Pekerja 80,000.00 28,000.00
L.02 0.150 OH Tukang Batu 100,000.00 15,000.00
L.03 0.015 OH Kepala Tukang 105,000.00 1,575.00
L.04 0.018 OH Mandor 105,000.00 1,890.00
B BAHAN 294,932.40
12.500 buah Batako 2,100.00 26,250.00
30.320 kg PC 1,120.00 33,958.40
0.728 m3 Pasir Pasang 318,000.00 231,504.00
0.280 kg Besi Angkur Ø 8 mm 11,500.00 3,220.00
C PERALATAN -
D JUMLAH A + B + C 341,397.40
E OVERHEAD & PROFIT (contoh 15%) 15% 51,209.61
F HARGA SATUAN PEKERJAAN (D+E) 392,607.01
17 A.4.4.1.17 1 m2 Pemasangan Dinding HB/CB 20, speci camp. 1SP : 4PP
A TENAGA 46,465.00
L.01 0.350 OH Pekerja 80,000.00 28,000.00
L.02 0.150 OH Tukang Batu 100,000.00 15,000.00
L.03 0.015 OH Kepala Tukang 105,000.00 1,575.00
L.04 0.018 OH Mandor 105,000.00 1,890.00
B BAHAN 302,137.20
12.500 buah Batako 2,100.00 26,250.00
24.260 kg PC 1,120.00 27,171.20
0.772 m3 Pasir Pasang 318,000.00 245,496.00
0.280 kg Besi Angkur Ø 8 mm 11,500.00 3,220.00
C PERALATAN -
D JUMLAH A + B + C 348,602.20
E OVERHEAD & PROFIT (contoh 15%) 15% 52,290.33
F HARGA SATUAN PEKERJAAN (D+E) 400,892.53

HALAMAN 114 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

18 A.4.4.1.18 1 m2 Pemasangan Dinding HB/CB 15, speci camp. 1SP : 3PP


A TENAGA 40,540.00
L.01 0.320 OH Pekerja 80,000.00 25,600.00
L.02 0.120 OH Tukang Batu 100,000.00 12,000.00
L.03 0.012 OH Kepala Tukang 105,000.00 1,260.00
L.04 0.016 OH Mandor 105,000.00 1,680.00
B BAHAN 226,088.80
12.500 buah Batako 1,800.00 22,500.00
22.740 kg PC 1,120.00 25,468.80
0.550 m3 Pasir Pasang 318,000.00 174,900.00

HALAMAN 115 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

0.280 kg Besi Angkur Ø 8 mm 11,500.00 3,220.00


C PERALATAN -
D JUMLAH A + B + C 266,628.80
E OVERHEAD & PROFIT (contoh 15%) 15% 39,994.32
F HARGA SATUAN PEKERJAAN (D+E) 306,623.12
19 A.4.4.1.19 1 m2 Pemasangan Dinding HB/CB 15, speci camp. 1SP : 4PP
A TENAGA 40,540.00
L.01 0.320 OH Pekerja 80,000.00 25,600.00
L.02 0.120 OH Tukang Batu 100,000.00 12,000.00
L.03 0.012 OH Kepala Tukang 105,000.00 1,260.00
L.04 0.016 OH Mandor 105,000.00 1,680.00
B BAHAN 231,180.00
12.500 buah Batako 1,800.00 22,500.00
18.200 kg PC 1,120.00 20,384.00
0.582 m3 Pasir Pasang 318,000.00 185,076.00
0.280 kg Besi Angkur Ø 8 mm 11,500.00 3,220.00
C PERALATAN -
D JUMLAH A + B + C 271,720.00
E OVERHEAD & PROFIT (contoh 15%) 15% 40,758.00
F HARGA SATUAN PEKERJAAN (D+E) 312,478.00
20 A.4.4.1.20 1 m2 Pemasangan Dinding HB/CB 10, speci camp. 1SP : 3PP
A TENAGA 36,625.00
L.01 0.300 OH Pekerja 80,000.00 24,000.00
L.02 0.100 OH Tukang Batu 100,000.00 10,000.00
L.03 0.010 OH Kepala Tukang 105,000.00 1,050.00
L.04 0.015 OH Mandor 105,000.00 1,575.00
B BAHAN 156,201.20
12.500 buah Batako 1,620.00 20,250.00
15.160 kg PC 1,120.00 16,979.20
0.364 m3 Pasir Pasang 318,000.00 115,752.00
0.280 kg Besi Angkur Ø 8 mm 11,500.00 3,220.00
C PERALATAN -
D JUMLAH A + B + C 192,826.20
E OVERHEAD & PROFIT (contoh 15%) 15% 28,923.93
F HARGA SATUAN PEKERJAAN (D+E) 221,750.13
21 A.4.4.1.21 1 m2 Pemasangan Dinding HB/CB 10, speci camp. 1SP : 4PP
A TENAGA 36,625.00
L.01 0.300 OH Pekerja 80,000.00 24,000.00
L.02 0.100 OH Tukang Batu 100,000.00 10,000.00
L.03 0.010 OH Kepala Tukang 105,000.00 1,050.00
L.04 0.015 OH Mandor 105,000.00 1,575.00
B BAHAN 160,439.60
12.500 buah Batako 1,620.00 20,250.00
12.130 kg PC 1,120.00 13,585.60
0.388 m3 Pasir Pasang 318,000.00 123,384.00
0.280 kg Besi Angkur Ø 8 mm 11,500.00 3,220.00
C PERALATAN -
D JUMLAH A + B + C 197,064.60
E OVERHEAD & PROFIT (contoh 15%) 15% 29,559.69

HALAMAN 116 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

F HARGA SATUAN PEKERJAAN (D+E) 226,624.29


22 A.4.4.1.22 1 m2 Pemasangan Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1SP : 3PP
A TENAGA 36,625.00
L.01 0.300 OH Pekerja 80,000.00 24,000.00
L.02 0.100 OH Tukang Batu 100,000.00 10,000.00
L.03 0.010 OH Kepala Tukang 105,000.00 1,050.00
L.04 0.015 OH Mandor 105,000.00 1,575.00
B BAHAN 233,450.00
30.000 Buah Terawang / Roster 7,000.00 210,000.00
11.000 kg Portland Semen 1,120.00 12,320.00

HALAMAN 117 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

0.035 m3 Pasir Pasang 318,000.00 11,130.00


C PERALATAN -
D JUMLAH A + B + C 270,075.00
E OVERHEAD & PROFIT (contoh 15%) 15% 40,511.25
F HARGA SATUAN PEKERJAAN (D+E) 310,586.25
23 A.4.4.1.23 1 m2 Pemasangan Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1SP : 4PP
A TENAGA 36,625.00
L.01 0.300 OH Pekerja 80,000.00 24,000.00
L.02 0.100 OH Tukang Batu 100,000.00 10,000.00
L.03 0.010 OH Kepala Tukang 105,000.00 1,050.00
L.04 0.015 OH Mandor 105,000.00 1,575.00
B BAHAN 233,450.00
30.000 Buah Terawang / Roster 7,000.00 210,000.00
11.000 kg Portland Semen 1,120.00 12,320.00
0.035 m3 Pasir Pasang 318,000.00 11,130.00
C PERALATAN -
D JUMLAH A + B + C 270,075.00
E OVERHEAD & PROFIT (contoh 15%) 15% 40,511.25
F HARGA SATUAN PEKERJAAN (D+E) 310,586.25
24 A.4.4.1.24 1 m2 Pemasangan Dinding Bata Berongga Ekspose Uk, (12x11x24)cm Camp. 1SP : 3PP
A TENAGA 36,625.00
L.01 0.300 OH Pekerja 80,000.00 24,000.00
L.02 0.100 OH Tukang Batu 100,000.00 10,000.00
L.03 0.010 OH Kepala Tukang 105,000.00 1,050.00
L.04 0.015 OH Mandor 105,000.00 1,575.00
B BAHAN 106,356.00
70.000 Buah Bata Roster 1,150.00 80,500.00
14.000 kg Portland Semen 1,120.00 15,680.00
0.032 m3 Pasir Pasang 318,000.00 10,176.00
C PERALATAN -
D JUMLAH A + B + C 142,981.00
E OVERHEAD & PROFIT (contoh 15%) 15% 21,447.15
F HARGA SATUAN PEKERJAAN (D+E) 164,428.15
Pemasangan Dinding Bata Ringan Tebal 7,5 cm
25 A.4.4.1.25 1 m2
dengan Mortar Siap Pakai
A TENAGA 197,565.00
L.01 0.670 OH Pekerja 80,000.00 53,600.00
L.02 1.300 OH Tukang Batu 100,000.00 130,000.00
L.03 0.130 OH Kepala Tukang 105,000.00 13,650.00
L.04 0.003 OH Mandor 105,000.00 315.00
B BAHAN 45,627.88
8.400 Buah Bata Ringan Tebal 7,5 cm 5,270.00 44,268.00
0.473 kg Mortar Siap Pakai 2,875.00 1,359.88
C PERALATAN -
D JUMLAH A + B + C 243,192.88
E OVERHEAD & PROFIT (contoh 15%) 15% 36,478.93
F HARGA SATUAN PEKERJAAN (D+E) 279,671.81
26 A.4.4.1.26 1 m2 Pemasangan Dinding Bata Ringan Tebal 10 cm dengan Mortar Siap Pakai
A TENAGA 185,360.00
L.01 0.671 OH Pekerja 80,000.00 53,680.00

HALAMAN 118 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

L.02 1.300 OH Tukang Batu 100,000.00 130,000.00


L.03 0.013 OH Kepala Tukang 105,000.00 1,365.00
L.04 0.003 OH Mandor 105,000.00 315.00
B BAHAN 76,083.53
8.400 Buah Bata Ringan Tebal 10 cm 9,036.00 75,902.40
0.063 kg Mortar Siap Pakai 2,875.00 181.13
C PERALATAN -
D JUMLAH A + B + C 261,443.53
E OVERHEAD & PROFIT (contoh 15%) 15% 39,216.53
F HARGA SATUAN PEKERJAAN (D+E) 300,660.05

HALAMAN 119 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

VII A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


1 A.4.4.2.1 1 m2 Pemasangan Plesteran 1 Pc : 1 Pp Tebal 15 mm
A TENAGA 42,150.00
L.01 0.300 OH Pekerja 80,000.00 24,000.00
L.02 0.150 OH Tukang batu 100,000.00 15,000.00
L.03 0.015 OH Kepala Tukang 105,000.00 1,575.00
L.04 0.015 OH Mandor 105,000.00 1,575.00
B BAHAN 22,452.48
15.504 Kg Portland Semen 1,120.00 17,364.48
0.016 m3 Pasir Pasang 318,000.00 5,088.00
C PERALATAN -
D JUMLAH A + B + C 64,602.48
E OVERHEAD & PROFIT (contoh 15%) 15% 9,690.37
F HARGA SATUAN PEKERJAAN (D+E) 74,292.85
2 A.4.4.2.2 1 m2 Pemasangan Plesteran 1 Pc : 2 Pp Tebal 15 mm
A TENAGA 42,150.00
L.01 0.300 OH Pekerja 80,000.00 24,000.00
L.02 0.150 OH Tukang batu 100,000.00 15,000.00
L.03 0.015 OH Kepala Tukang 105,000.00 1,575.00
L.04 0.015 OH Mandor 105,000.00 1,575.00
B BAHAN 17,810.88
10.224 Kg Portland Semen 1,120.00 11,450.88
0.020 m3 Pasir Pasang 318,000.00 6,360.00
C PERALATAN -
D JUMLAH A + B + C 59,960.88
E OVERHEAD & PROFIT (contoh 15%) 15% 8,994.13
F HARGA SATUAN PEKERJAAN (D+E) 68,955.01
3 A.4.4.2.3 1 m2 Pemasangan Plesteran 1 Pc : 3 Pp Tebal 15 mm
A TENAGA 42,150.00
L.01 0.300 OH Pekerja 80,000.00 24,000.00
L.02 0.150 OH Tukang batu 100,000.00 15,000.00
L.03 0.015 OH Kepala Tukang 105,000.00 1,575.00
L.04 0.015 OH Mandor 105,000.00 1,575.00
B BAHAN 16,023.12
7.776 Kg Portland Semen 1,120.00 8,709.12
0.023 m3 Pasir Pasang 318,000.00 7,314.00
C PERALATAN -
D JUMLAH A + B + C 58,173.12
E OVERHEAD & PROFIT (contoh 15%) 15% 8,725.97
F HARGA SATUAN PEKERJAAN (D+E) 66,899.09
4 A.4.4.2.4 1 m2 Pemasangan Plesteran 1 Pc : 4 Pp Tebal 15 mm
A TENAGA 42,150.00
L.01 0.300 OH Pekerja 80,000.00 24,000.00
L.02 0.150 OH Tukang batu 100,000.00 15,000.00
L.03 0.015 OH Kepala Tukang 105,000.00 1,575.00
L.04 0.015 OH Mandor 105,000.00 1,575.00
B BAHAN 14,620.80
6.240 Kg Portland Semen 1,120.00 6,988.80
0.024 m3 Pasir Pasang 318,000.00 7,632.00

HALAMAN 120 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

C PERALATAN -
D JUMLAH A + B + C 56,770.80
E OVERHEAD & PROFIT (contoh 15%) 15% 8,515.62
F HARGA SATUAN PEKERJAAN (D+E) 65,286.42
5 A.4.4.2.5 1 m2 Pemasangan Plesteran 1 Pc : 5 Pp Tebal 15 mm
A TENAGA 42,150.00
L.01 0.300 OH Pekerja 80,000.00 24,000.00
L.02 0.150 OH Tukang batu 100,000.00 15,000.00
L.03 0.015 OH Kepala Tukang 105,000.00 1,575.00
L.04 0.015 OH Mandor 105,000.00 1,575.00

HALAMAN 121 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

B BAHAN 14,074.08
5.184 Kg Portland Semen 1,120.00 5,806.08
0.026 m3 Pasir Pasang 318,000.00 8,268.00
C PERALATAN -
D JUMLAH A + B + C 56,224.08
E OVERHEAD & PROFIT (contoh 15%) 15% 8,433.61
F HARGA SATUAN PEKERJAAN (D+E) 64,657.69
6 A.4.4.2.6 1 m2 Pemasangan Plesteran 1 Pc : 6 Pp Tebal 15 mm
A TENAGA 42,150.00
L.01 0.300 OH Pekerja 80,000.00 24,000.00
L.02 0.150 OH Tukang batu 100,000.00 15,000.00
L.03 0.015 OH Kepala Tukang 105,000.00 1,575.00
L.04 0.015 OH Mandor 105,000.00 1,575.00
B BAHAN 13,531.92
4.416 Kg Portland Semen 1,120.00 4,945.92
0.027 m3 Pasir Pasang 318,000.00 8,586.00
C PERALATAN -
D JUMLAH A + B + C 55,681.92
E OVERHEAD & PROFIT (contoh 15%) 15% 8,352.29
F HARGA SATUAN PEKERJAAN (D+E) 64,034.21
7 A.4.4.2.7 1 m2 Pemasangan Plesteran 1 Pc : 7 Pp Tebal 15 mm
A TENAGA 42,150.00
L.01 0.300 OH Pekerja 80,000.00 24,000.00
L.02 0.150 OH Tukang batu 100,000.00 15,000.00
L.03 0.015 OH Kepala Tukang 105,000.00 1,575.00
L.04 0.015 OH Mandor 105,000.00 1,575.00
B BAHAN 13,312.32
3.936 Kg Portland Semen 1,120.00 4,408.32
0.028 m3 Pasir Pasang 318,000.00 8,904.00
C PERALATAN -
D JUMLAH A + B + C 55,462.32
E OVERHEAD & PROFIT (contoh 15%) 15% 8,319.35
F HARGA SATUAN PEKERJAAN (D+E) 63,781.67
8 A.4.4.2.8 1 m2 Pemasangan Plesteran 1 Pc : 8 Pp Tebal 15 mm
A TENAGA 42,150.00
L.01 0.300 OH Pekerja 80,000.00 24,000.00
L.02 0.150 OH Tukang batu 100,000.00 15,000.00
L.03 0.015 OH Kepala Tukang 105,000.00 1,575.00
L.04 0.015 OH Mandor 105,000.00 1,575.00
B BAHAN 13,092.72
3.456 Kg Portland Semen 1,120.00 3,870.72
0.029 m3 Pasir Pasang 318,000.00 9,222.00
C PERALATAN -
D JUMLAH A + B + C 55,242.72
E OVERHEAD & PROFIT (contoh 15%) 15% 8,286.41
F HARGA SATUAN PEKERJAAN (D+E) 63,529.13
9 A.4.4.2.9 1 m2 Pemasangan Plesteran 1 Pc :1/2 Kp:3 Pp Tebal 15 mm
A TENAGA 43,950.00
L.01 0.360 OH Pekerja 80,000.00 28,800.00

HALAMAN 122 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

L.02 0.120 OH Tukang batu 100,000.00 12,000.00


L.03 0.012 OH Kepala Tukang 105,000.00 1,260.00
L.04 0.018 OH Mandor 105,000.00 1,890.00
B BAHAN 11,185.20
5.760 Kg Portland Semen 1,120.00 6,451.20
0.003 m3 Kapur Pasang 200,000.00 600.00
0.013 m3 Pasir Pasang 318,000.00 4,134.00

HALAMAN 123 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

C PERALATAN -
D JUMLAH A + B + C 55,135.20
E OVERHEAD & PROFIT (contoh 15%) 15% 8,270.28
F HARGA SATUAN PEKERJAAN (D+E) 63,405.48
10 A.4.4.2.10 1 m2 Pemasangan Plesteran 1 Pc : 2 Kp : 8 Pp Tebal 15 mm
A TENAGA 43,950.00
L.01 0.360 OH Pekerja 80,000.00 28,800.00
L.02 0.120 OH Tukang batu 100,000.00 12,000.00
L.03 0.012 OH Kepala Tukang 105,000.00 1,260.00
L.04 0.018 OH Mandor 105,000.00 1,890.00
B BAHAN 10,720.00
3.000 kg Portland Semen 1,120.00 3,360.00
0.005 m3 Kapur Padam 200,000.00 1,000.00
0.020 m3 Pasir Pasang 318,000.00 6,360.00
C PERALATAN -
D JUMLAH A + B + C 54,670.00
E OVERHEAD & PROFIT (contoh 15%) 15% 8,200.50
F HARGA SATUAN PEKERJAAN (D+E) 62,870.50
11 A.4.4.2.11 1 m2 Pemasangan Plesteran 1 SM : 1 Kp : 1 Pp Tebal 15 mm
A TENAGA 43,950.00
L.01 0.360 OH Pekerja 80,000.00 28,800.00
L.02 0.120 OH Tukang batu 100,000.00 12,000.00
L.03 0.012 OH Kepala Tukang 105,000.00 1,260.00
L.04 0.018 OH Mandor 105,000.00 1,890.00
B BAHAN 6,237.00
0.009 m3 Semen Merah 175,000.00 1,575.00
0.009 m3 Kapur Padam 200,000.00 1,800.00
0.009 m3 Pasir Pasang 318,000.00 2,862.00
C PERALATAN -
D JUMLAH A + B + C 50,187.00
E OVERHEAD & PROFIT (contoh 15%) 15% 7,528.05
F HARGA SATUAN PEKERJAAN (D+E) 57,715.05
12 A.4.4.2.12 1 m2 Pemasangan Plesteran 1 SM : 1 Kp : 2 Pp Tebal 15 mm
A TENAGA 43,950.00
L.01 0.360 OH Pekerja 80,000.00 28,800.00
L.02 0.120 OH Tukang batu 100,000.00 12,000.00
L.03 0.012 OH Kepala Tukang 105,000.00 1,260.00
L.04 0.018 OH Mandor 105,000.00 1,890.00
B BAHAN 7,395.00
0.007 m3 Semen Merah 175,000.00 1,225.00
0.007 m3 Kapur Padam 200,000.00 1,400.00
0.015 m3 Pasir Pasang 318,000.00 4,770.00
C PERALATAN -
D JUMLAH A + B + C 51,345.00
E OVERHEAD & PROFIT (contoh 15%) 15% 7,701.75
F HARGA SATUAN PEKERJAAN (D+E) 59,046.75
13 A.4.4.2.13 1 m2 Pemasangan Plesteran 1 Pc : 2 Pp Tebal 20 mm
A TENAGA 56,410.00
L.01 0.400 OH Pekerja 80,000.00 32,000.00

HALAMAN 124 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

L.02 0.200 OH Tukang batu 100,000.00 20,000.00


L.03 0.020 OH Kepala Tukang 105,000.00 2,100.00
L.04 0.022 OH Mandor 105,000.00 2,310.00
B BAHAN 23,853.84
13.632 kg Portland Semen 1,120.00 15,267.84
0.027 m3 Pasir Pasang 318,000.00 8,586.00
C PERALATAN -
D JUMLAH A + B + C 80,263.84
E OVERHEAD & PROFIT (contoh 15%) 15% 12,039.58
F HARGA SATUAN PEKERJAAN (D+E) 92,303.42

HALAMAN 125 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

14 A.4.4.2.14 1 m2 Pemasangan Plesteran 1Pc : 3Pp Tebal 20 mm


A TENAGA 44,265.00
L.01 0.260 OH Pekerja 80,000.00 20,800.00
L.02 0.200 OH Tukang batu 100,000.00 20,000.00
L.03 0.020 OH Kepala Tukang 105,000.00 2,100.00
L.04 0.013 OH Mandor 105,000.00 1,365.00
B BAHAN 21,470.16
10.368 Kg Portland Semen 1,120.00 11,612.16
0.031 m3 Pasir Pasang 318,000.00 9,858.00
C PERALATAN -
D JUMLAH A + B + C 65,735.16
E OVERHEAD & PROFIT (contoh 15%) 15% 9,860.27
F HARGA SATUAN PEKERJAAN (D+E) 75,595.43
15 A.4.4.2.15 1 m2 Pemasangan Plesteran 1 Pc : 4 Pp Tebal 20 mm
A TENAGA 56,410.00
L.01 0.400 OH Pekerja 80,000.00 32,000.00
L.02 0.200 OH Tukang batu 100,000.00 20,000.00
L.03 0.020 OH Kepala Tukang 105,000.00 2,100.00
L.04 0.022 OH Mandor 105,000.00 2,310.00
B BAHAN 19,494.40
8.320 kg Portland Semen 1,120.00 9,318.40
0.032 m3 Pasir Pasang 318,000.00 10,176.00
C PERALATAN -
D JUMLAH A + B + C 75,904.40
E OVERHEAD & PROFIT (contoh 15%) 15% 11,385.66
F HARGA SATUAN PEKERJAAN (D+E) 87,290.06
16 A.4.4.2.16 1 m2 Pemasangan Plesteran 1Pc : 5Pp Tebal 20 mm
A TENAGA 56,410.00
L.01 0.400 OH Pekerja 80,000.00 32,000.00
L.02 0.200 OH Tukang batu 100,000.00 20,000.00
L.03 0.020 OH Kepala Tukang 105,000.00 2,100.00
L.04 0.022 OH Mandor 105,000.00 2,310.00
B BAHAN 18,871.44
6.912 Kg Portland Semen 1,120.00 7,741.44
0.035 m3 Pasir Pasang 318,000.00 11,130.00
C PERALATAN -
D JUMLAH A + B + C 75,281.44
E OVERHEAD & PROFIT (contoh 15%) 15% 11,292.22
F HARGA SATUAN PEKERJAAN (D+E) 86,573.66
17 A.4.4.2.17 1 m2 Pemasangan Plesteran 1Pc : 6Pp Tebal 20 mm
A TENAGA 56,410.00
L.01 0.400 OH Pekerja 80,000.00 32,000.00
L.02 0.200 OH Tukang batu 100,000.00 20,000.00
L.03 0.020 OH Kepala Tukang 105,000.00 2,100.00
L.04 0.022 OH Mandor 105,000.00 2,310.00
B BAHAN 18,042.56
5.888 Kg Portland Semen 1,120.00 6,594.56
0.036 m3 Pasir Pasang 318,000.00 11,448.00
C PERALATAN -

HALAMAN 126 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

D JUMLAH A + B + C 74,452.56
E OVERHEAD & PROFIT (contoh 15%) 15% 11,167.88
F HARGA SATUAN PEKERJAAN (D+E) 85,620.44
18 A.4.4.2.18 1 m2 Pemasangan Plesteran 1 SM : 2 Kp : 2 Pp Tebal 20 mm
A TENAGA 61,820.00
L.01 0.440 OH Pekerja 80,000.00 35,200.00
L.02 0.220 OH Tukang batu 100,000.00 22,000.00
L.03 0.022 OH Kepala Tukang 105,000.00 2,310.00
L.04 0.022 OH Mandor 105,000.00 2,310.00

HALAMAN 127 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

B BAHAN 9,099.00
0.009 m3 Semen Merah 175,000.00 1,575.00
0.009 m3 Kapur Padam 200,000.00 1,800.00
0.018 m3 Pasir Pasang 318,000.00 5,724.00
C PERALATAN -
D JUMLAH A + B + C 70,919.00
E OVERHEAD & PROFIT (contoh 15%) 15% 10,637.85
F HARGA SATUAN PEKERJAAN (D+E) 81,556.85
19 A.4.4.2.19 1 m2 Pemasangan Berapen 1 Pc : 5Pp Tebal 15 mm
A TENAGA 21,180.00
L.01 0.150 OH Pekerja 80,000.00 12,000.00
L.02 0.075 OH Tukang batu 100,000.00 7,500.00
L.03 0.008 OH Kepala Tukang 105,000.00 840.00
L.04 0.008 OH Mandor 105,000.00 840.00
B BAHAN 14,074.08
5.184 Kg Portland Semen 1,120.00 5,806.08
0.026 m3 Pasir Pasang 318,000.00 8,268.00
C PERALATAN -
D JUMLAH A + B + C 35,254.08
E OVERHEAD & PROFIT (contoh 15%) 15% 5,288.11
F HARGA SATUAN PEKERJAAN (D+E) 40,542.19
20 A.4.4.2.20 1 m' Pemasangan Plesteran Skoning 1 Pc : 2Pp, lebar 10 mm
A TENAGA 51,020.00
L.01 0.080 OH Pekerja 80,000.00 6,400.00
L.02 0.400 OH Tukang batu 100,000.00 40,000.00
L.03 0.040 OH Kepala Tukang 105,000.00 4,200.00
L.04 0.004 OH Mandor 105,000.00 420.00
B BAHAN 4,694.00
0.500 Kg Portland Semen 1,120.00 560.00
0.013 m3 Pasir Pasang 318,000.00 4,134.00
C PERALATAN -
D JUMLAH A + B + C 55,714.00
E OVERHEAD & PROFIT (contoh 15%) 15% 8,357.10
F HARGA SATUAN PEKERJAAN (D+E) 64,071.10
21 A.4.4.2.21 1 m' Pemasangan Plesteran Granit 1Pc : 2 Granit , Tebal 10 mm
A TENAGA -
L.01 0.450 OH Pekerja -
L.02 0.225 OH Tukang batu -
L.03 0.023 OH Kepala Tukang -
L.04 0.023 OH Mandor -
B BAHAN -
10.000 Kg Portland Semen -
15.000 Kg Batu Granit -
C PERALATAN -
D JUMLAH A + B + C -
E OVERHEAD & PROFIT (contoh 15%) 15% -
F HARGA SATUAN PEKERJAAN (D+E) -
22 A.4.4.2.22 1 m' Pemasangan Plesteran Traso 1Pc : 2Traso, lebar 10 mm
A TENAGA -

HALAMAN 128 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

L.01 0.450 OH Pekerja -


L.02 0.225 OH Tukang batu -
L.03 0.023 OH Kepala Tukang -
L.04 0.023 OH Mandor -
B BAHAN -
10.000 Kg Portland Semen -
15.000 m3 Batu Traso -

HALAMAN 129 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

C PERALATAN -
D JUMLAH A + B + C -
E OVERHEAD & PROFIT (contoh 15%) 15% -
F HARGA SATUAN PEKERJAAN (D+E) -
23 A.4.4.2.23 1 m2 Pemasangan Plesteran Ciprat 1Pc : 2 Pp
A TENAGA 36,625.00
L.01 0.300 OH Pekerja 80,000.00 24,000.00
L.02 0.100 OH Tukang batu 100,000.00 10,000.00
L.03 0.010 OH Kepala Tukang 105,000.00 1,050.00
L.04 0.015 OH Mandor 105,000.00 1,575.00
B BAHAN 6,746.40
4.320 Kg Portland Semen 1,120.00 4,838.40
0.006 m3 Pasir Pasang 318,000.00 1,908.00
C PERALATAN -
D JUMLAH A + B + C 43,371.40
E OVERHEAD & PROFIT (contoh 15%) 15% 6,505.71
F HARGA SATUAN PEKERJAAN (D+E) 49,877.11
24 A.4.4.2.24 1 m2 Pemasangan Finishing Siar Pasangan Dinding Bata Merah
A TENAGA 21,180.00
L.01 0.150 OH Pekerja 80,000.00 12,000.00
L.02 0.075 OH Tukang batu 100,000.00 7,500.00
L.03 0.008 OH Kepala Tukang 105,000.00 840.00
L.04 0.008 OH Mandor 105,000.00 840.00
B BAHAN 3,480.96
3.108 Kg Portland Semen 1,120.00 3,480.96
C PERALATAN -
D JUMLAH A + B + C 24,660.96
E OVERHEAD & PROFIT (contoh 15%) 15% 3,699.14
F HARGA SATUAN PEKERJAAN (D+E) 28,360.10
25 A.4.4.2.25 1 m2 Pemasangan Finishing Siar Pasangan Dinding Conblock ekspose
A TENAGA 9,940.00
L.01 0.070 OH Pekerja 80,000.00 5,600.00
L.02 0.035 OH Tukang batu 100,000.00 3,500.00
L.03 0.004 OH Kepala Tukang 105,000.00 420.00
L.04 0.004 OH Mandor 105,000.00 420.00
B BAHAN 1,792.00
1.600 Kg Portland Semen 1,120.00 1,792.00
C PERALATAN -
D JUMLAH A + B + C 11,732.00
E OVERHEAD & PROFIT (contoh 15%) 15% 1,759.80
F HARGA SATUAN PEKERJAAN (D+E) 13,491.80
26 A.4.4.2.26 1 m2 Pemasangan Finishing Siar Pas.Batu Kali Adukan 1Pc : 2Pp
A TENAGA 42,150.00
L.01 0.300 OH Pekerja 80,000.00 24,000.00
L.02 0.150 OH Tukang batu 100,000.00 15,000.00
L.03 0.015 OH Kepala Tukang 105,000.00 1,575.00
L.04 0.015 OH Mandor 105,000.00 1,575.00
B BAHAN 10,916.80
6.340 Kg Portland Semen 1,120.00 7,100.80

HALAMAN 130 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

0.012 m3 Pasir Pasang 318,000.00 3,816.00


C PERALATAN -
D JUMLAH A + B + C 53,066.80
E OVERHEAD & PROFIT (contoh 15%) 15% 7,960.02
F HARGA SATUAN PEKERJAAN (D+E) 61,026.82
27 A.4.4.2.27 1 m2 Pemasangan Acian
A TENAGA 28,100.00
L.01 0.200 OH Pekerja 80,000.00 16,000.00
L.02 0.100 OH Tukang batu 100,000.00 10,000.00
L.03 0.010 OH Kepala Tukang 105,000.00 1,050.00

HALAMAN 131 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

L.04 0.010 OH Mandor 105,000.00 1,050.00


B BAHAN 3,640.00
3.250 Kg Portland Semen 1,120.00 3,640.00
C PERALATAN -
D JUMLAH A + B + C 31,740.00
E OVERHEAD & PROFIT (contoh 15%) 15% 4,761.00
F HARGA SATUAN PEKERJAAN (D+E) 36,501.00
28 A.4.4.2.28 1 m2 Pemasangan Plesteran dg Mortar Siap Pakai (MSP)
A TENAGA 28,100.00
L.01 0.200 OH Pekerja 80,000.00 16,000.00
L.02 0.100 OH Tukang batu 100,000.00 10,000.00
L.03 0.010 OH Kepala Tukang 105,000.00 1,050.00
L.04 0.010 OH Mandor 105,000.00 1,050.00
B BAHAN 7,100.80
6.340 Kg Portland Semen 1,120.00 7,100.80
C PERALATAN -
D JUMLAH A + B + C 35,200.80
E OVERHEAD & PROFIT (contoh 15%) 15% 5,280.12
F HARGA SATUAN PEKERJAAN (D+E) 40,480.92
29 A.4.4.2.29 1 m2 Pemasangan Acian dg Mortar Siap Pakai (MSP)
A TENAGA 28,100.00
L.01 0.200 OH Pekerja 80,000.00 16,000.00
L.02 0.100 OH Tukang batu 100,000.00 10,000.00
L.03 0.010 OH Kepala Tukang 105,000.00 1,050.00
L.04 0.010 OH Mandor 105,000.00 1,050.00
B BAHAN 12,187.50
3.250 Kg Acian dengan mortar 3,750.00 12,187.50
C PERALATAN -
D JUMLAH A + B + C 40,287.50
E OVERHEAD & PROFIT (contoh 15%) 15% 6,043.13
F HARGA SATUAN PEKERJAAN (D+E) 46,330.63
VIII A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan DINDING
1 A.4.4.3.2 1 m2 Pemasangan lantai Ubin PC Abu-abu Uk. 30 x 30 cm
A TENAGA 35,230.00
L.01 0.250 OH Pekerja 80,000.00 20,000.00
L.02 0.125 OH Tukang Batu 100,000.00 12,500.00
L.03 0.013 OH Kepala Tukang 105,000.00 1,365.00
L.04 0.013 OH Mandor 105,000.00 1,365.00
B BAHAN 69,752.73
11.870 Buah Ubin Abu-abu 30x30 cm 3,727.27 44,242.73
10.000 Kg Portland Semen 1,120.00 11,200.00
0.045 m3 Pasir Pasang 318,000.00 14,310.00
C PERALATAN -
D JUMLAH A + B + C 104,982.73
E OVERHEAD & PROFIT (contoh 15%) 15% 15,747.41
F HARGA SATUAN PEKERJAAN (D+E) 120,730.14
2 A.4.4.3.3 1 m2 Pemasangan lantai Ubin PC Abu-abu Uk. 20 x 20 cm
A TENAGA 38,040.00
L.01 0.270 OH Pekerja 80,000.00 21,600.00

HALAMAN 132 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

L.02 0.135 OH Tukang Batu 100,000.00 13,500.00


L.03 0.014 OH Kepala Tukang 105,000.00 1,470.00
L.04 0.014 OH Mandor 105,000.00 1,470.00

HALAMAN 133 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

B BAHAN 117,503.45
26.500 Buah Ubin Abu-abu 20x20 cm 3,454.55 91,545.45
10.400 Kg Portland Semen 1,120.00 11,648.00
0.045 m3 Pasir Pasang 318,000.00 14,310.00
C PERALATAN -
D JUMLAH A + B + C 155,543.45
E OVERHEAD & PROFIT (contoh 15%) 15% 23,331.52
F HARGA SATUAN PEKERJAAN (D+E) 178,874.97
3 A.4.4.3.5 1 m2 Pemasangan lantai Ubin PC Warna Uk. 30 x 30 cm
A TENAGA 36,530.00
L.01 0.260 OH Pekerja 80,000.00 20,800.00
L.02 0.130 OH Tukang Batu 100,000.00 13,000.00
L.03 0.013 OH Kepala Tukang 105,000.00 1,365.00
L.04 0.013 OH Mandor 105,000.00 1,365.00
B BAHAN 77,631.59
11.870 Buah Ubin Warna 30x30 cm 4,090.91 48,559.09
10.000 Kg Portland Semen 1,120.00 11,200.00
1.500 Kg Semen warna 2,375.00 3,562.50
0.045 m3 Pasir Pasang 318,000.00 14,310.00
C PERALATAN -
D JUMLAH A + B + C 114,161.59
E OVERHEAD & PROFIT (contoh 15%) 15% 17,124.24
F HARGA SATUAN PEKERJAAN (D+E) 131,285.83
4 A.4.4.3.6 1 m2 Pemasangan lantai Ubin PC Warna Uk. 20 x 20 cm
A TENAGA 38,040.00
L.01 0.270 OH Pekerja 80,000.00 21,600.00
L.02 0.135 OH Tukang Batu 100,000.00 13,500.00
L.03 0.014 OH Kepala Tukang 105,000.00 1,470.00
L.04 0.014 OH Mandor 105,000.00 1,470.00
B BAHAN 130,987.32
26.500 Buah Ubin Warna 20x20 cm 3,818.18 101,181.82
10.400 Kg Portland Semen 1,120.00 11,648.00
1.620 Kg Semen warna 2,375.00 3,847.50
0.045 m3 Pasir Pasang 318,000.00 14,310.00
C PERALATAN -
D JUMLAH A + B + C 169,027.32
E OVERHEAD & PROFIT (contoh 15%) 15% 25,354.10
F HARGA SATUAN PEKERJAAN (D+E) 194,381.42
5 A.4.4.3.9 1 m2 Pemasangan lantai Ubin Granite tile Uk. 40 x 40 cm
A TENAGA 35,230.00
L.01 0.250 OH Pekerja 80,000.00 20,000.00
L.02 0.125 OH Tukang Batu 100,000.00 12,500.00
L.03 0.013 OH Kepala Tukang 105,000.00 1,365.00
L.04 0.013 OH Mandor 105,000.00 1,365.00
B BAHAN 215,670.98
6.630 Buah granite tile 0x40 cm 28,250.00 187,297.48
9.800 Kg Portland Semen 1,120.00 10,976.00
1.300 Kg Semen warna 2,375.00 3,087.50
0.045 m3 Pasir Pasang 318,000.00 14,310.00

HALAMAN 134 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

C PERALATAN -
D JUMLAH A + B + C 250,900.98
E OVERHEAD & PROFIT (contoh 15%) 15% 37,635.15
F HARGA SATUAN PEKERJAAN (D+E) 288,536.12
6 A.4.4.3.16 1 m' Pemasangan Ubin Plin Pc.Abu-abu Uk. 15 x 20 cm
A TENAGA 17,670.00
L.01 0.090 OH Pekerja 80,000.00 7,200.00
L.02 0.090 OH Tukang Batu 100,000.00 9,000.00
L.03 0.009 OH Kepala Tukang 105,000.00 945.00
L.04 0.005 OH Mandor 105,000.00 525.00

HALAMAN 135 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

B BAHAN 47,498.80
5.300 Buah Ubin Plin Pc Abu-abu 15x20 cm 6,000.00 31,800.00
1.240 Kg Portland Semen 1,120.00 1,388.80
0.045 m3 Pasir Pasang 318,000.00 14,310.00
C PERALATAN -
D JUMLAH A + B + C 65,168.80
E OVERHEAD & PROFIT (contoh 15%) 15% 9,775.32
F HARGA SATUAN PEKERJAAN (D+E) 74,944.12
7 A.4.4.3.19 1 m' Pemasangan Ubin Plin Pc.Warna Uk. 10 x 20 cm
A TENAGA 17,670.00
L.01 0.090 OH Pekerja 80,000.00 7,200.00
L.02 0.090 OH Tukang Batu 100,000.00 9,000.00
L.03 0.009 OH Kepala Tukang 105,000.00 945.00
L.04 0.005 OH Mandor 105,000.00 525.00
B BAHAN 17,043.30
2.650 Buah Ubin Plin Pc Warna 15x20 cm 5,500.00 14,575.00
1.140 Kg Portland Semen 1,120.00 1,276.80
0.100 Kg Semen Warna 2,375.00 237.50
0.003 m3 Pasir Pasang 318,000.00 954.00
C PERALATAN -
D JUMLAH A + B + C 34,713.30
E OVERHEAD & PROFIT (contoh 15%) 15% 5,207.00
F HARGA SATUAN PEKERJAAN (D+E) 39,920.30
8 A.4.4.3.32 1 m2 Pemasangan Lantai Keramik 10x 20 cm
A TENAGA 98,350.00
L.01 0.700 OH Pekerja 80,000.00 56,000.00
L.02 0.350 OH Tukang Batu 100,000.00 35,000.00
L.03 0.035 OH Kepala Tukang 105,000.00 3,675.00
L.04 0.035 OH Mandor 105,000.00 3,675.00
B BAHAN 88,314.05
53.000 Buah Keramik 10 x 20 cm 1,100.00 58,300.00
8.190 Kg Portland Semen 1,120.00 9,172.80
2.750 Kg Semen Warna 2,375.00 6,531.25
0.045 m3 Pasir Pasang 318,000.00 14,310.00
C PERALATAN -
D JUMLAH A + B + C 186,664.05
E OVERHEAD & PROFIT (contoh 15%) 15% 27,999.61
F HARGA SATUAN PEKERJAAN (D+E) 214,663.66
9 A.4.4.3.33 1 m2 Pemasangan lantai Keramik Uk. 10 x 10 cm / 5 x 20 cm
A TENAGA -
L.01 0.700 OH Pekerja -
L.02 0.350 OH Tukang Batu -
L.03 0.035 OH Kepala Tukang -
L.04 0.035 OH Mandor -
B BAHAN -
106.000 Buah Keramik 10 x 10 cm / 5 x 20 cm -
8.190 Kg Portland Semen -
3.200 Kg Semen Warna -
0.045 m3 Pasir Pasang -

HALAMAN 136 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

C PERALATAN -
D JUMLAH A + B + C -
E OVERHEAD & PROFIT (contoh 15%) 15% -
F HARGA SATUAN PEKERJAAN (D+E) -
10 A.4.4.3.34 1 m2 Pemasangan Lantai Keramik 33 x 33 cm
A TENAGA -
L.01 0.700 OH Pekerja -
L.02 0.350 OH Tukang Batu -
L.03 0.035 OH Kepala Tukang -
L.04 0.035 OH Mandor -

HALAMAN 137 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

B BAHAN -
10.000 Buah Ubin Keramik 33 x 33 cm -
8.190 Kg Portland Semen -
0.045 m3 Pasir Pasang -
1.620 Kg Semen Warna -
C PERALATAN -
D JUMLAH A + B + C -
E OVERHEAD & PROFIT (contoh 15%) 15% -
F HARGA SATUAN PEKERJAAN (D+E) -
11 A.4.4.3.35 1 m2 Pemasangan Lantai Keramik 30 x 30 cm putih
A TENAGA 98,350.00
L.01 0.700 OH Pekerja 80,000.00 56,000.00
L.02 0.350 OH Tukang Batu 100,000.00 35,000.00
L.03 0.035 OH Kepala Tukang 105,000.00 3,675.00
L.04 0.035 OH Mandor 105,000.00 3,675.00
B BAHAN 81,300.50
11.870 Buah Ubin Keramik 30 x 30 cm putih 4,400.00 52,228.00
10.000 Kg Portland Semen 1,120.00 11,200.00
0.045 m3 Pasir Pasang 318,000.00 14,310.00
1.500 Kg Semen Warna 2,375.00 3,562.50
C PERALATAN -
D JUMLAH A + B + C 179,650.50
E OVERHEAD & PROFIT (contoh 15%) 15% 26,947.58
F HARGA SATUAN PEKERJAAN (D+E) 206,598.08
12 A.4.4.3.36 1 m2 Pemasangan Lantai Keramik 20 x 20 cm warna
A TENAGA 98,350.00
L.01 0.700 OH Pekerja 80,000.00 56,000.00
L.02 0.350 OH Tukang Batu 100,000.00 35,000.00
L.03 0.035 OH Kepala Tukang 105,000.00 3,675.00
L.04 0.035 OH Mandor 105,000.00 3,675.00
B BAHAN 89,430.50
26.500 Buah Ubin Keramik 20 x 20 cm warna 2,250.00 59,625.00
10.400 Kg Portland Semen 1,120.00 11,648.00
1.620 Kg Semen Warna 2,375.00 3,847.50
0.045 m3 Pasir Pasang 318,000.00 14,310.00
C PERALATAN -
D JUMLAH A + B + C 187,780.50
E OVERHEAD & PROFIT (contoh 15%) 15% 28,167.08
F HARGA SATUAN PEKERJAAN (D+E) 215,947.58
13 A.4.4.3.37 1 m2 Pemasangan Lantai Keramik uk.10 x 33 cm, untuk variasi / border
A TENAGA -
L.01 1.050 OH Pekerja -
L.02 0.525 OH Tukang Batu -
L.03 0.053 OH Kepala Tukang -
L.04 0.035 OH Mandor -
B BAHAN -
33.000 Buah Ubin Keramik -
9.800 Kg Portland Semen -
4.370 Kg Semen Warna -

HALAMAN 138 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

0.045 m3 Pasir Pasang -


C PERALATAN -
D JUMLAH A + B + C -
E OVERHEAD & PROFIT (contoh 15%) 15% -
F HARGA SATUAN PEKERJAAN (D+E) -
14 A.4.4.3.39 1 m' Pemasangan Plint Keramik Ukuran 10x20 cm warna
A TENAGA 17,670.00
L.01 0.090 OH Pekerja 80,000.00 7,200.00
L.02 0.090 OH Tukang Batu 100,000.00 9,000.00
L.03 0.009 OH Kepala Tukang 105,000.00 945.00

HALAMAN 139 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

L.04 0.005 OH Mandor 105,000.00 525.00


B BAHAN 8,120.18
5.300 Buah Ubin Keramik 10x20 cm warna 1,100.00 5,830.00
1.140 Kg Portland Semen 1,120.00 1,276.80
0.003 m3 Pasir Pasang 318,000.00 954.00
0.025 Kg Semen Warna 2,375.00 59.38
C PERALATAN -
D JUMLAH A + B + C 25,790.18
E OVERHEAD & PROFIT (contoh 15%) 15% 3,868.53
F HARGA SATUAN PEKERJAAN (D+E) 29,658.70
15 A.4.4.3.40 1 m' Pemasangan Plint Keramik Ukuran 10x10 cm
A TENAGA -
L.01 0.090 OH Pekerja -
L.02 0.090 OH Tukang Batu -
L.03 0.009 OH Kepala Tukang -
L.04 0.005 OH Mandor -
B BAHAN -
10.600 Buah Ubin Keramik -
1.140 Kg Portland Semen -
0.003 m3 Pasir Pasang -
0.050 Kg Semen Warna -
C PERALATAN -
D JUMLAH A + B + C -
E OVERHEAD & PROFIT (contoh 15%) 15% -
F HARGA SATUAN PEKERJAAN (D+E) -
16 A.4.4.3.41 1 m' Pemasangan Plint Keramik Ukuran 5x20 cm
A TENAGA 17,670.00
L.01 0.090 OH Pekerja 80,000.00 7,200.00
L.02 0.090 OH Tukang Batu 100,000.00 9,000.00
L.03 0.009 OH Kepala Tukang 105,000.00 945.00
L.04 0.005 OH Mandor 105,000.00 525.00
B BAHAN 81,849.55
10.600 Buah Ubin Keramik 7,500.00 79,500.00
1.140 Kg Portland Semen 1,120.00 1,276.80
0.003 m3 Pasir Pasang 318,000.00 954.00
0.050 Kg Semen Warna 2,375.00 118.75
C PERALATAN -
D JUMLAH A + B + C 99,519.55
E OVERHEAD & PROFIT (contoh 15%) 15% 14,927.93
F HARGA SATUAN PEKERJAAN (D+E) 114,447.48
17 A.4.4.3.43 1 m2 Pemasangan Lantai Marmer Ukuran 1.00x1.00 cm
A TENAGA 98,350.00
L.01 0.700 OH Pekerja 80,000.00 56,000.00
L.02 0.350 OH Tukang Batu 100,000.00 35,000.00
L.03 0.035 OH Kepala Tukang 105,000.00 3,675.00
L.04 0.035 OH Mandor 105,000.00 3,675.00
B BAHAN 31,386.55
1.060 buah Marmer 6,000.00 6,360.00
8.190 kg Portland Semen 1,120.00 9,172.80

HALAMAN 140 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

0.045 m3 Pasir Pasang 318,000.00 14,310.00


0.650 kg Semen Warna 2,375.00 1,543.75
C PERALATAN -
D JUMLAH A + B + C 129,736.55
E OVERHEAD & PROFIT (contoh 15%) 15% 19,460.48
F HARGA SATUAN PEKERJAAN (D+E) 149,197.03
18 A.4.4.3.44 1 m2 Pemasangan Lantai Karpet
A TENAGA 33,330.00
L.01 0.170 OH Pekerja 80,000.00 13,600.00
L.02 0.170 OH Tukang Batu 100,000.00 17,000.00

HALAMAN 141 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

L.03 0.017 OH Kepala Tukang 105,000.00 1,785.00


L.04 0.009 OH Mandor 105,000.00 945.00
B BAHAN 43,750.00
1.050 m2 Karpet 30,000.00 31,500.00
0.350 kg Lem aica aibon/ kuning 35,000.00 12,250.00
C PERALATAN -
D JUMLAH A + B + C 77,080.00
E OVERHEAD & PROFIT (contoh 15%) 15% 11,562.00
F HARGA SATUAN PEKERJAAN (D+E) 88,642.00
19 A.4.4.3.46 1 m2 Pemasangan Lantai Parquet Jati
A TENAGA 98,350.00
L.01 0.700 OH Pekerja 80,000.00 56,000.00
L.02 0.350 OH Tukang Batu 100,000.00 35,000.00
L.03 0.035 OH Kepala Tukang 105,000.00 3,675.00
L.04 0.035 OH Mandor 105,000.00 3,675.00
B BAHAN 215,250.00
1.050 m2 Parquet Jati 185,000.00 194,250.00
0.600 Kg Lem Vynil (aica/ aibon/ kuning) 35,000.00 21,000.00
C PERALATAN -
D JUMLAH A + B + C 313,600.00
E OVERHEAD & PROFIT (contoh 15%) 15% 47,040.00
F HARGA SATUAN PEKERJAAN (D+E) 360,640.00
20 A.4.4.3.48 1 m2 Pemasangan Dinding Porselen 11 x 11 cm
A TENAGA -
L.01 1.000 OH Pekerja -
L.02 0.500 OH Tukang Batu -
L.03 0.050 OH Kepala Tukang -
L.04 0.050 OH Mandor -
B BAHAN -
86.000 bh Porselen -
9.300 Kg Portland Semen -
2.750 Kg Semen Warna -
0.018 m3 Pasir Pasang -
C PERALATAN -
D JUMLAH A + B + C -
E OVERHEAD & PROFIT (contoh 15%) 15% -
F HARGA SATUAN PEKERJAAN (D+E) -
21 A.4.4.3.49 1 m2 Pemasangan Dinding Porselen 10x20 cm
A TENAGA -
L.01 0.900 OH Pekerja -
L.02 0.450 OH Tukang Batu -
L.03 0.045 OH Kepala Tukang -
L.04 0.045 OH Mandor -
B BAHAN -
53.000 Buah Keramik -
9.300 Kg Portland Semen -
0.018 m3 Pasir Pasang -
2.750 Kg Semen Warna -
C PERALATAN -

HALAMAN 142 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

D JUMLAH A + B + C -
E OVERHEAD & PROFIT (contoh 15%) 15% -
F HARGA SATUAN PEKERJAAN (D+E) -
22 A.4.4.3.50 1 m2 Pemasangan Dinding Porselen 20x20 cm,
A TENAGA -
L.01 0.900 OH Pekerja -
L.02 0.450 OH Tukang Batu -
L.03 0.045 OH Kepala Tukang -
L.04 0.045 OH Mandor -

HALAMAN 143 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

B BAHAN -
26.000 Buah Keramik -
9.300 Kg Portland Semen -
0.018 m3 Pasir Pasang -
1.940 Kg Semen Warna -
C PERALATAN -
D JUMLAH A + B + C -
E OVERHEAD & PROFIT (contoh 15%) 15% -
F HARGA SATUAN PEKERJAAN (D+E) -
23 A.4.4.3.53 1 m2 Pemasangan Dinding Keramik 10x20 cm,warna
A TENAGA 126,450.00
L.01 0.900 OH Pekerja 80,000.00 72,000.00
L.02 0.450 OH Tukang Batu 100,000.00 45,000.00
L.03 0.045 OH Kepala Tukang 105,000.00 4,725.00
L.04 0.045 OH Mandor 105,000.00 4,725.00
B BAHAN 80,971.25
53.000 Buah Keramik 1,100.00 58,300.00
9.300 Kg Portland Semen 1,120.00 10,416.00
0.018 m3 Pasir Pasang 318,000.00 5,724.00
2.750 Kg Semen Warna 2,375.00 6,531.25
C PERALATAN -
D JUMLAH A + B + C 207,421.25
E OVERHEAD & PROFIT (contoh 15%) 15% 31,113.19
F HARGA SATUAN PEKERJAAN (D+E) 238,534.44
24 A.4.4.3.54 1 m2 Pemasangan Dinding Keramik 20x20 cm,warna
A TENAGA 126,450.00
L.01 0.900 OH Pekerja 80,000.00 72,000.00
L.02 0.450 OH Tukang Batu 100,000.00 45,000.00
L.03 0.045 OH Kepala Tukang 105,000.00 4,725.00
L.04 0.045 OH Mandor 105,000.00 4,725.00
B BAHAN 80,372.50
26.500 Buah Keramik 2,250.00 59,625.00
9.300 Kg Portland Semen 1,120.00 10,416.00
0.018 m3 Pasir Pasang 318,000.00 5,724.00
1.940 Kg Semen Warna 2,375.00 4,607.50
C PERALATAN -
D JUMLAH A + B + C 206,822.50
E OVERHEAD & PROFIT (contoh 15%) 15% 31,023.38
F HARGA SATUAN PEKERJAAN (D+E) 237,845.88
25 A.4.4.3.55 1 m2 Pemasangan Dinding Marmer Ukuran 1.00x1.00 cm
A TENAGA 182,650.00
L.01 1.300 OH Pekerja 80,000.00 104,000.00
L.02 0.650 OH Tukang Batu 100,000.00 65,000.00
L.03 0.065 OH Kepala Tukang 105,000.00 6,825.00
L.04 0.065 OH Mandor 105,000.00 6,825.00
B BAHAN 32,188.95
1.060 buah Marmer 6,000.00 6,360.00
3.003 buah Paku (sekrup fixer) 800.00 2,402.40
12.440 kg Portlan Semen 1,120.00 13,932.80

HALAMAN 144 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

0.025 m3 Pasir Pasang 318,000.00 7,950.00


0.650 kg Semen Warna 2,375.00 1,543.75
C PERALATAN -
D JUMLAH A + B + C 214,838.95
E OVERHEAD & PROFIT (contoh 15%) 15% 32,225.84
F HARGA SATUAN PEKERJAAN (D+E) 247,064.79
26 A.4.4.3.58 1 m2 Pemasangan Dinding Batu Paros / Batu Tempel Hitam
A TENAGA 98,350.00
L.01 0.700 OH Pekerja 80,000.00 56,000.00
L.02 0.350 OH Tukang Batu 100,000.00 35,000.00

HALAMAN 145 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

L.03 0.035 OH Kepala Tukang 105,000.00 3,675.00


L.04 0.035 OH Mandor 105,000.00 3,675.00
B BAHAN 156,290.00
1.100 m2 Batu Paros / Batu Tempel Hitam 120,000.00 132,000.00
11.750 Kg Portland Semen 1,120.00 13,160.00
0.035 m3 Pasir Pasang 318,000.00 11,130.00
C PERALATAN -
D JUMLAH A + B + C 254,640.00
E OVERHEAD & PROFIT (contoh 15%) 15% 38,196.00
F HARGA SATUAN PEKERJAAN (D+E) 292,836.00
27 A.4.4.3.59 1 m2 Pemasangan Lantai Vynil uk.30 x 30 cm
A TENAGA -
L.01 0.350 OH Pekerja -
L.02 0.175 OH Tukang Batu -
L.03 0.017 OH Kepala Tukang -
L.04 0.002 OH Mandor -
B BAHAN -
11.870 bh Vynil 30x30cm -
0.250 kg Lem -
C PERALATAN -
D JUMLAH A + B + C -
E OVERHEAD & PROFIT (contoh 15%) 15% -
F HARGA SATUAN PEKERJAAN (D+E) -
28 A.4.4.3.60 1 m2 Pemasangan Wallpaper Lebar 50 Cm
A TENAGA 47,495.00
L.01 0.350 OH Pekerja 80,000.00 28,000.00
L.02 0.175 OH Tukang Batu 100,000.00 17,500.00
L.03 0.017 OH Kepala Tukang 105,000.00 1,785.00
L.04 0.002 OH Mandor 105,000.00 210.00
B BAHAN 524,500.00
2.200 m' Wallpaper 235,000.00 517,000.00
0.250 kg Lem 30,000.00 7,500.00
C PERALATAN -
D JUMLAH A + B + C 571,995.00
E OVERHEAD & PROFIT (contoh 15%) 15% 85,799.25
F HARGA SATUAN PEKERJAAN (D+E) 657,794.25
29 A.4.4.3.63 1 m' Pemasangan Plint Kayu jati Ukuran 2x10 cm
A TENAGA 23,490.00
L.01 0.120 OH Pekerja 80,000.00 9,600.00
L.02 0.120 OH Tukang Batu 100,000.00 12,000.00
L.03 0.012 OH Kepala Tukang 105,000.00 1,260.00
L.04 0.006 OH Mandor 105,000.00 630.00
B BAHAN 33,750.00
0.003 m3 Papan Kayu jati 11,000,000.00 33,000.00
0.050 kg Paku Sekrup 5 cm 15,000.00 750.00
C PERALATAN -
D JUMLAH A + B + C 57,240.00
E OVERHEAD & PROFIT (contoh 15%) 15% 8,586.00
F HARGA SATUAN PEKERJAAN (D+E) 65,826.00

HALAMAN 146 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

30 A.4.4.3.64 1 m2 Pemasangan Paving Block Natural Tebal 6 Cm


A TENAGA 75,386.50
L.01 0.250 OH Pekerja 80,000.00 20,000.00
L.02 0.500 OH Tukang Batu 100,000.00 50,000.00
L.03 0.050 OH Kepala Tukang 105,000.00 5,250.00
L.04 0.001 OH Mandor 105,000.00 136.50
B BAHAN 95,700.00
1.010 m2 Paving Block Tebal 6 Cm 85,000.00 85,850.00
0.050 m3 Pasir urug 197,000.00 9,850.00

HALAMAN 147 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

C PERALATAN -
- % Peralatan - -
D JUMLAH A + B + C 171,086.50
E OVERHEAD & PROFIT (contoh 15%) 15% 25,662.98
F HARGA SATUAN PEKERJAAN (D+E) 196,749.48
31 A.4.4.3.65 1 m2 Pemasangan Paving Block Natural Tebal 8 Cm
A TENAGA 95,386.50
L.01 0.500 OH Pekerja 80,000.00 40,000.00
L.02 0.500 OH Tukang Batu 100,000.00 50,000.00
L.03 0.050 OH Kepala Tukang 105,000.00 5,250.00
L.04 0.001 OH Mandor 105,000.00 136.50
B BAHAN 106,710.00
1.010 m2 Paving Block Tebal 8 Cm 92,000.00 92,920.00
0.070 m3 Pasir urug 197,000.00 13,790.00
C PERALATAN -
- % Peralatan -
D JUMLAH A + B + C 202,096.50
E OVERHEAD & PROFIT (contoh 15%) 15% 30,314.48
F HARGA SATUAN PEKERJAAN (D+E) 232,410.98
32 A.4.4.3.66 1 m2 Pemasangan Paving Block Berwarna Tebal 6 Cm
A TENAGA 75,386.50
L.01 0.250 OH Pekerja 80,000.00 20,000.00
L.02 0.500 OH Tukang Batu 100,000.00 50,000.00
L.03 0.050 OH Kepala Tukang 105,000.00 5,250.00
L.04 0.001 OH Mandor 105,000.00 136.50
B BAHAN 105,800.00
1.010 m2 Paving Block Berwarna Tebal 6 Cm 95,000.00 95,950.00
0.050 m3 Pasir urug 197,000.00 9,850.00
C PERALATAN -
- % Peralatan -
D JUMLAH A + B + C 181,186.50
E OVERHEAD & PROFIT (contoh 15%) 15% 27,177.98
F HARGA SATUAN PEKERJAAN (D+E) 208,364.48
33 A.4.4.3.67 1 m2 Pemasangan Paving Block Berwarna Tebal 8 Cm
A TENAGA 95,386.50
L.01 0.500 OH Pekerja 80,000.00 40,000.00
L.02 0.500 OH Tukang Batu 100,000.00 50,000.00
L.03 0.050 OH Kepala Tukang 105,000.00 5,250.00
L.04 0.001 OH Mandor 105,000.00 136.50
B BAHAN 116,810.00
1.010 m2 Paving Block Tebal Berwarna 8 Cm 102,000.00 103,020.00
0.070 m3 Pasir urug 197,000.00 13,790.00
C PERALATAN -
- % Peralatan -
D JUMLAH A + B + C 212,196.50
E OVERHEAD & PROFIT (contoh 15%) 15% 31,829.48
F HARGA SATUAN PEKERJAAN (D+E) 244,025.98
IX A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT
1 A.4.5.1.1 1 m2 Pemasangan Langit-langit Asbes (1,00x1,00) m, tebal 5 mm

HALAMAN 148 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

A TENAGA 10,555.00
L.01 0.030 OH Pekerja 80,000.00 2,400.00
L.02 0.070 OH Tukang Kayu 100,000.00 7,000.00
L.03 0.007 OH Kepala Tukang 105,000.00 735.00
L.04 0.004 OH Mandor 105,000.00 420.00
B BAHAN 18,950.00
1.100 Lbr Plat Asbes 17,000.00 18,700.00
0.010 Kg Paku 25,000.00 250.00

HALAMAN 149 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

C PERALATAN -
D JUMLAH A + B + C 29,505.00
E OVERHEAD & PROFIT (contoh 15%) 15% 4,425.75
F HARGA SATUAN PEKERJAAN (D+E) 33,930.75
2 A.4.5.1.2 1 m2 Pemasangan Langit-langit Akustik Ukuran (30x30) cm
A TENAGA 23,490.00
L.01 0.120 OH Pekerja 80,000.00 9,600.00
L.02 0.120 OH Tukang Kayu 100,000.00 12,000.00
L.03 0.012 OH Kepala Tukang 105,000.00 1,260.00
L.04 0.006 OH Mandor 105,000.00 630.00
B BAHAN 301,250.00
12.000 Lbr Akustik Uk.30 x 30 cm 25,000.00 300,000.00
0.050 Kg Paku 25,000.00 1,250.00
C PERALATAN -
D JUMLAH A + B + C 324,740.00
E OVERHEAD & PROFIT (contoh 15%) 15% 48,711.00
F HARGA SATUAN PEKERJAAN (D+E) 373,451.00
3 A.4.5.1.3 1 m2 Pemasangan Langit-langit Akustik Ukuran (30x60) cm
A TENAGA 19,575.00
L.01 0.100 OH Pekerja 80,000.00 8,000.00
L.02 0.100 OH Tukang Kayu 100,000.00 10,000.00
L.03 0.010 OH Kepala Tukang 105,000.00 1,050.00
L.04 0.005 OH Mandor 105,000.00 525.00
B BAHAN 204,250.00
5.800 Lbr Akustik 35,000.00 203,000.00
0.050 Kg Paku 25,000.00 1,250.00
C PERALATAN -
D JUMLAH A + B + C 223,825.00
E OVERHEAD & PROFIT (contoh 15%) 15% 33,573.75
F HARGA SATUAN PEKERJAAN (D+E) 257,398.75
4 A.4.5.1.4 1 m2 Pemasangan Langit-langit Akustik Ukuran (60x120) cm
A TENAGA 19,575.00
L.01 0.100 OH Pekerja 80,000.00 8,000.00
L.02 0.100 OH Tukang Kayu 100,000.00 10,000.00
L.03 0.010 OH Kepala Tukang 105,000.00 1,050.00
L.04 0.005 OH Mandor 105,000.00 525.00
B BAHAN 220,250.00
1.500 Lbr Akustik 146,000.00 219,000.00
0.050 Kg Paku 25,000.00 1,250.00
C PERALATAN -
D JUMLAH A + B + C 239,825.00
E OVERHEAD & PROFIT (contoh 15%) 15% 35,973.75
F HARGA SATUAN PEKERJAAN (D+E) 275,798.75
5 A.4.5.1.5 1 m2 Memasang Langit-langit Tripleks Uk (120x240) cm, Tebal 3 mm, 4 mm & 6 mm
A TENAGA 19,575.00
L.01 0.100 OH Pekerja 80,000.00 8,000.00
L.02 0.100 OH Tukang Kayu 100,000.00 10,000.00
L.03 0.010 OH Kepala Tukang 105,000.00 1,050.00
L.04 0.005 OH Mandor 105,000.00 525.00

HALAMAN 150 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

B BAHAN 32,625.00
0.375 Lbr Tripleks (4 mm) 85,000.00 31,875.00
0.030 Kg Paku Tripleks 25,000.00 750.00
C PERALATAN -
D JUMLAH A + B + C 52,200.00
E OVERHEAD & PROFIT (contoh 15%) 15% 7,830.00
F HARGA SATUAN PEKERJAAN (D+E) 60,030.00

HALAMAN 151 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

6 A.4.5.1.6 1 m2 Memasang Langit-langit Lambriziring Kayu Jati, tebal 6 mm


A TENAGA 156,600.00
L.01 0.800 OH Pekerja 80,000.00 64,000.00
L.02 0.800 OH Tukang Kayu 100,000.00 80,000.00
L.03 0.080 OH Kepala Tukang 105,000.00 8,400.00
L.04 0.040 OH Mandor 105,000.00 4,200.00
B BAHAN 165,250.00
0.015 m3 Kayu Jati,Papan 11,000,000.00 165,000.00
0.010 Kg Paku 25,000.00 250.00
C PERALATAN -
D JUMLAH A + B + C 321,850.00
E OVERHEAD & PROFIT (contoh 15%) 15% 48,277.50
F HARGA SATUAN PEKERJAAN (D+E) 370,127.50
7 A.4.5.1.7 1 m2 Memasang Langit-langit Gypsu Board, Ukuran (120x240) tebal 9 mm
A TENAGA 14,050.00
L.01 0.100 OH Pekerja 80,000.00 8,000.00
L.02 0.050 OH Tukang Kayu 100,000.00 5,000.00
L.03 0.005 OH Kepala Tukang 105,000.00 525.00
L.04 0.005 OH Mandor 105,000.00 525.00
B BAHAN 21,492.00
0.364 Lbr Gypsum Board 53,000.00 19,292.00
0.110 Kg Paku Sekrup 20,000.00 2,200.00
C PERALATAN -
D JUMLAH A + B + C 35,542.00
E OVERHEAD & PROFIT (contoh 15%) 15% 5,331.30
F HARGA SATUAN PEKERJAAN (D+E) 40,873.30
8 A.4.5.1.8 1 m2 Memasang Langit-langit Akuatik Uk (60x120) cm & Berikut Rangka Allumunium
A TENAGA -
L.01 0.500 OH Pekerja -
L.02 0.500 OH Tukang Kayu -
L.03 0.050 OH Kepala Tukang -
L.04 0.025 OH Mandor -
B BAHAN -
3.600 m' Profil Allumunium "T" -
0.150 kg Kawat Ø 4 mm -
1.050 bh Ramset -
1.500 lmb Akuatik 60 x 120 cm -
C PERALATAN -
D JUMLAH A + B + C -
E OVERHEAD & PROFIT (contoh 15%) 15% -
F HARGA SATUAN PEKERJAAN (D+E) -
9 A.4.5.1.9 1 m1 List Langit-Langit Kayu Profil
A TENAGA 9,840.00
L.01 0.050 OH Pekerja 80,000.00 4,000.00
L.02 0.050 OH Tukang Kayu 100,000.00 5,000.00
L.03 0.005 OH Kepala Tukang 105,000.00 525.00
L.04 0.003 OH Mandor 105,000.00 315.00
B BAHAN 8,505.00
1.050 m1 List Kayu Profil 7,900.00 8,295.00

HALAMAN 152 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

0.010 Kg Paku 21,000.00 210.00


C PERALATAN -
D JUMLAH A + B + C 18,345.00
E OVERHEAD & PROFIT (contoh 15%) 15% 2,751.75
F HARGA SATUAN PEKERJAAN (D+E) 21,096.75

HALAMAN 153 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

X A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP


1 A.4.5.2.1 1 m2 Pemasangan Atap Genteng Plentong Kecil
A TENAGA 21,127.50
L.01 0.150 OH Pekerja 80,000.00 12,000.00
L.02 0.075 OH Tukang Kayu 100,000.00 7,500.00
L.03 0.008 OH Kepala Tukang 105,000.00 787.50
L.04 0.008 OH Mandor 105,000.00 840.00
B BAHAN 52,500.00
25.000 Buah Genteng Plentong 2,100.00 52,500.00
C PERALATAN -
D JUMLAH A + B + C 73,627.50
E OVERHEAD & PROFIT (contoh 15%) 15% 11,044.13
F HARGA SATUAN PEKERJAAN (D+E) 84,671.63
2 A.4.5.2.2 1 m2 Pemasangan Atap Genteng Kodok / Glasur
A TENAGA 21,180.00
L.01 0.150 OH Pekerja 80,000.00 12,000.00
L.02 0.075 OH Tukang Kayu 100,000.00 7,500.00
L.03 0.008 OH Kepala Tukang 105,000.00 840.00
L.04 0.008 OH Mandor 105,000.00 840.00
B BAHAN 110,000.00
25.000 Buah Genteng Kodok / Glasur 4,400.00 110,000.00
C PERALATAN -
D JUMLAH A + B + C 131,180.00
E OVERHEAD & PROFIT (contoh 15%) 15% 19,677.00
F HARGA SATUAN PEKERJAAN (D+E) 150,857.00
3 A.4.5.2.3 1 m2 Pemasangan Atap Genteng Plentong Super / Besar
A TENAGA 21,180.00
L.01 0.150 OH Pekerja 80,000.00 12,000.00
L.02 0.075 OH Tukang Kayu 100,000.00 7,500.00
L.03 0.008 OH Kepala Tukang 105,000.00 840.00
L.04 0.008 OH Mandor 105,000.00 840.00
B BAHAN 54,000.00
12.000 Buah Genteng Plentong Super / Besar 4,500.00 54,000.00
C PERALATAN -
D JUMLAH A + B + C 75,180.00
E OVERHEAD & PROFIT (contoh 15%) 15% 11,277.00
F HARGA SATUAN PEKERJAAN (D+E) 86,457.00
4 A.4.5.2.4 1 m' Pemasangan Genteng Bubung Plentong
A TENAGA 54,310.00
L.01 0.400 OH Pekerja 80,000.00 32,000.00
L.02 0.200 OH Tukang Kayu 100,000.00 20,000.00
L.03 0.020 OH Kepala Tukang 105,000.00 2,100.00
L.04 0.002 OH Mandor 105,000.00 210.00
B BAHAN 56,636.00
5.000 Buah Genteng Bubung Plentong 7,500.00 37,500.00
8.000 Kg Portland Semen 1,120.00 8,960.00
0.032 m3 Pasir Pasang 318,000.00 10,176.00
C PERALATAN -
D JUMLAH A + B + C 110,946.00

HALAMAN 154 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

E OVERHEAD & PROFIT (contoh 15%) 15% 16,641.90


F HARGA SATUAN PEKERJAAN (D+E) 127,587.90
5 A.4.5.2.5 1 m' Pemasangan Genteng Bubung Kodok / Glasur
A TENAGA 54,310.00
L.01 0.400 OH Pekerja 80,000.00 32,000.00
L.02 0.200 OH Tukang Kayu 100,000.00 20,000.00
L.03 0.020 OH Kepala Tukang 105,000.00 2,100.00
L.04 0.002 OH Mandor 105,000.00 210.00

HALAMAN 155 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

B BAHAN 54,136.00
5.000 Buah Genteng Bubung Kodok / Glasur 7,000.00 35,000.00
8.000 Kg Portland Semen 1,120.00 8,960.00
0.032 m3 Pasir Pasang 318,000.00 10,176.00
C PERALATAN -
D JUMLAH A + B + C 108,446.00
E OVERHEAD & PROFIT (contoh 15%) 15% 16,266.90
F HARGA SATUAN PEKERJAAN (D+E) 124,712.90
6 A.4.5.2.6 1 m' Pemasangan Genteng Bubung Plentong Besar
A TENAGA 54,310.00
L.01 0.400 OH Pekerja 80,000.00 32,000.00
L.02 0.200 OH Tukang Kayu 100,000.00 20,000.00
L.03 0.020 OH Kepala Tukang 105,000.00 2,100.00
L.04 0.002 OH Mandor 105,000.00 210.00
B BAHAN 49,136.00
4.000 Buah Genteng Bubung Plentong Besar 7,500.00 30,000.00
8.000 Kg Portland Semen 1,120.00 8,960.00
0.032 m3 Pasir Pasang 318,000.00 10,176.00
C PERALATAN -
D JUMLAH A + B + C 103,446.00
E OVERHEAD & PROFIT (contoh 15%) 15% 15,516.90
F HARGA SATUAN PEKERJAAN (D+E) 118,962.90
7 A.4.5.2.7 1 m2 Pemasangan Roof Light Fibreglass 90 x 180
A TENAGA -
L.01 0.140 OH Pekerja -
L.02 0.067 OH Tukang Kayu -
L.03 0.007 OH Kepala Tukang -
L.04 0.007 OH Mandor -
B BAHAN -
0.600 Lbr Rooflight 90 x 180 -
0.050 Kg Paku Biasa -
C PERALATAN -
D JUMLAH A + B + C -
E OVERHEAD & PROFIT (contoh 15%) 15% -
F HARGA SATUAN PEKERJAAN (D+E) -
8 A.4.5.2.8 1 m2 Pemasangan Atap Asbes Gelombang (2,50x0,92 m) x 5 mm
A TENAGA 20,380.00
L.01 0.140 OH Pekerja 80,000.00 11,200.00
L.02 0.075 OH Tukang Kayu 100,000.00 7,500.00
L.03 0.008 OH Kepala Tukang 105,000.00 840.00
L.04 0.008 OH Mandor 105,000.00 840.00
B BAHAN 49,900.00
0.500 Lbr Asbes Gelombang 95,000.00 47,500.00
0.120 Kg Paku Pancing 60 x 230 20,000.00 2,400.00
C PERALATAN -
D JUMLAH A + B + C 70,280.00
E OVERHEAD & PROFIT (contoh 15%) 15% 10,542.00
F HARGA SATUAN PEKERJAAN (D+E) 80,822.00
9 A.4.5.2.9 1 m2 Pemasangan Atap Asbes Gelombang (2,25x0,92 m) x 5 mm

HALAMAN 156 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

A TENAGA 19,670.00
L.01 0.140 OH Pekerja 80,000.00 11,200.00
L.02 0.070 OH Tukang Kayu 100,000.00 7,000.00
L.03 0.007 OH Kepala Tukang 105,000.00 735.00
L.04 0.007 OH Mandor 105,000.00 735.00
B BAHAN 56,400.00
0.600 Lbr Asbes Gelombang 90,000.00 54,000.00
0.120 Kg Paku Pancing 60 x 230 20,000.00 2,400.00

HALAMAN 157 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

C PERALATAN -
D JUMLAH A + B + C 76,070.00
E OVERHEAD & PROFIT (contoh 15%) 15% 11,410.50
F HARGA SATUAN PEKERJAAN (D+E) 87,480.50
10 A.4.5.2.10 1 m2 Pemasangan Atap Asbes Gelombang (2,00x0,92 m) x 5 mm
A TENAGA 19,670.00
L.01 0.140 OH Pekerja 80,000.00 11,200.00
L.02 0.070 OH Tukang Kayu 100,000.00 7,000.00
L.03 0.007 OH Kepala Tukang 105,000.00 735.00
L.04 0.007 OH Mandor 105,000.00 735.00
B BAHAN 53,400.00
0.600 Lbr Asbes Gelombang 85,000.00 51,000.00
0.120 Kg Paku Pancing 60 x 230 20,000.00 2,400.00
C PERALATAN -
D JUMLAH A + B + C 73,070.00
E OVERHEAD & PROFIT (contoh 15%) 15% 10,960.50
F HARGA SATUAN PEKERJAAN (D+E) 84,030.50
11 A.4.5.2.11 1 m2 Pemasangan Atap Asbes Gelombang (1,80x0,92 m) x 5 mm
A TENAGA 19,670.00
L.01 0.140 OH Pekerja 80,000.00 11,200.00
L.02 0.070 OH Tukang Kayu 100,000.00 7,000.00
L.03 0.007 OH Kepala Tukang 105,000.00 735.00
L.04 0.007 OH Mandor 105,000.00 735.00
B BAHAN 30,900.00
0.750 Lbr Asbes Gelombang 38,000.00 28,500.00
0.120 Kg Paku Pancing 60 x 230 20,000.00 2,400.00
C PERALATAN -
D JUMLAH A + B + C 50,570.00
E OVERHEAD & PROFIT (contoh 15%) 15% 7,585.50
F HARGA SATUAN PEKERJAAN (D+E) 58,155.50
12 A.4.5.2.12 1 m2 Pemasangan Atap Asbes Gelombang (3,00x1,05 m) x 4 mm
A TENAGA 19,670.00
L.01 0.140 OH Pekerja 80,000.00 11,200.00
L.02 0.070 OH Tukang Kayu 100,000.00 7,000.00
L.03 0.007 OH Kepala Tukang 105,000.00 735.00
L.04 0.007 OH Mandor 105,000.00 735.00
B BAHAN 28,125.00
0.350 Lbr Asbes Gelombang 73,500.00 25,725.00
0.120 Kg Paku Pancing 60 x 230 20,000.00 2,400.00
C PERALATAN -
D JUMLAH A + B + C 47,795.00
E OVERHEAD & PROFIT (contoh 15%) 15% 7,169.25
F HARGA SATUAN PEKERJAAN (D+E) 54,964.25
13 A.4.5.2.13 1 m2 Pemasangan Atap Asbes Gelombang (2,70x1,05 m) x 4 mm
A TENAGA 19,670.00
L.01 0.140 OH Pekerja 80,000.00 11,200.00
L.02 0.070 OH Tukang Kayu 100,000.00 7,000.00
L.03 0.007 OH Kepala Tukang 105,000.00 735.00
L.04 0.007 OH Mandor 105,000.00 735.00

HALAMAN 158 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

B BAHAN 29,700.00
0.420 Lbr Asbes Gelombang 65,000.00 27,300.00
0.120 Kg Paku Pancing 60 x 230 20,000.00 2,400.00
C PERALATAN -
D JUMLAH A + B + C 49,370.00
E OVERHEAD & PROFIT (contoh 15%) 15% 7,405.50
F HARGA SATUAN PEKERJAAN (D+E) 56,775.50

HALAMAN 159 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

14 A.4.5.2.14 1 m2 Pemasangan Atap Asbes Gelombang (2,40x1,05 m) x 4 mm


A TENAGA 19,670.00
L.01 0.140 OH Pekerja 80,000.00 11,200.00
L.02 0.070 OH Tukang Kayu 100,000.00 7,000.00
L.03 0.007 OH Kepala Tukang 105,000.00 735.00
L.04 0.007 OH Mandor 105,000.00 735.00
B BAHAN 28,360.00
0.440 Lbr Asbes Gelombang 59,000.00 25,960.00
0.120 Kg Paku Pancing 60 x 230 20,000.00 2,400.00
C PERALATAN -
D JUMLAH A + B + C 48,030.00
E OVERHEAD & PROFIT (contoh 15%) 15% 7,204.50
F HARGA SATUAN PEKERJAAN (D+E) 55,234.50
15 A.4.5.2.15 1 m2 Pemasangan Atap Asbes Gelombang (2,10x1,05 m) x 4 mm
A TENAGA 19,670.00
L.01 0.140 OH Pekerja 80,000.00 11,200.00
L.02 0.070 OH Tukang Kayu 100,000.00 7,000.00
L.03 0.007 OH Kepala Tukang 105,000.00 735.00
L.04 0.007 OH Mandor 105,000.00 735.00
B BAHAN 23,820.00
0.510 Lbr Asbes Gelombang 42,000.00 21,420.00
0.120 Kg Paku Pancing 60 x 230 20,000.00 2,400.00
C PERALATAN -
D JUMLAH A + B + C 43,490.00
E OVERHEAD & PROFIT (contoh 15%) 15% 6,523.50
F HARGA SATUAN PEKERJAAN (D+E) 50,013.50
16 A.4.5.2.16 1 m2 Pemasangan Atap Asbes Gelombang (1,50x1,05 m) x 4 mm
A TENAGA 19,670.00
L.01 0.140 OH Pekerja 80,000.00 11,200.00
L.02 0.070 OH Tukang Kayu 100,000.00 7,000.00
L.03 0.007 OH Kepala Tukang 105,000.00 735.00
L.04 0.007 OH Mandor 105,000.00 735.00
B BAHAN 28,000.00
0.800 Lbr Asbes Gelombang 32,000.00 25,600.00
0.120 Kg Paku Pancing 60 x 230 20,000.00 2,400.00
C PERALATAN -
D JUMLAH A + B + C 47,670.00
E OVERHEAD & PROFIT (contoh 15%) 15% 7,150.50
F HARGA SATUAN PEKERJAAN (D+E) 54,820.50
17 A.4.5.2.17 1 m2 Pemasangan Atap Asbes Gelombang (3,00x1,08 m) x 6 mm
A TENAGA 19,670.00
L.01 0.140 OH Pekerja 80,000.00 11,200.00
L.02 0.070 OH Tukang Kayu 100,000.00 7,000.00
L.03 0.007 OH Kepala Tukang 105,000.00 735.00
L.04 0.007 OH Mandor 105,000.00 735.00
B BAHAN 29,595.00
0.370 Lbr Asbes Gelombang 73,500.00 27,195.00
0.120 Kg Paku Pancing 60 x 230 20,000.00 2,400.00
C PERALATAN -

HALAMAN 160 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

D JUMLAH A + B + C 49,265.00
E OVERHEAD & PROFIT (contoh 15%) 15% 7,389.75
F HARGA SATUAN PEKERJAAN (D+E) 56,654.75
18 A.4.5.2.18 1 m2 Pemasangan Atap Asbes Gelombang (2,70x1,08 m) x 6 mm
A TENAGA 19,670.00
L.01 0.140 OH Pekerja 80,000.00 11,200.00
L.02 0.070 OH Tukang Kayu 100,000.00 7,000.00
L.03 0.007 OH Kepala Tukang 105,000.00 735.00
L.04 0.007 OH Mandor 105,000.00 735.00

HALAMAN 161 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

B BAHAN 29,700.00
0.420 Lbr Asbes Gelombang 65,000.00 27,300.00
0.120 Kg Paku Pancing 60 x 230 20,000.00 2,400.00
C PERALATAN -
D JUMLAH A + B + C 49,370.00
E OVERHEAD & PROFIT (contoh 15%) 15% 7,405.50
F HARGA SATUAN PEKERJAAN (D+E) 56,775.50
19 A.4.5.2.19 1 m2 Pemasangan Atap Asbes Gelombang (2,40x1,08 m) x 6 mm
A TENAGA 19,670.00
L.01 0.140 OH Pekerja 80,000.00 11,200.00
L.02 0.070 OH Tukang Kayu 100,000.00 7,000.00
L.03 0.007 OH Kepala Tukang 105,000.00 735.00
L.04 0.007 OH Mandor 105,000.00 735.00
B BAHAN 28,360.00
0.440 Lbr Asbes Gelombang 59,000.00 25,960.00
0.120 Kg Paku Pancing 60 x 230 20,000.00 2,400.00
C PERALATAN -
D JUMLAH A + B + C 48,030.00
E OVERHEAD & PROFIT (contoh 15%) 15% 7,204.50
F HARGA SATUAN PEKERJAAN (D+E) 55,234.50
20 A.4.5.2.20 1 m2 Pemasangan Atap Asbes Gelombang (2,10x1,08 m) x 6 mm
A TENAGA 19,670.00
L.01 0.140 OH Pekerja 80,000.00 11,200.00
L.02 0.070 OH Tukang Kayu 100,000.00 7,000.00
L.03 0.007 OH Kepala Tukang 105,000.00 735.00
L.04 0.007 OH Mandor 105,000.00 735.00
B BAHAN 22,980.00
0.490 Lbr Asbes Gelombang 42,000.00 20,580.00
0.120 Kg Paku Pancing 60 x 230 20,000.00 2,400.00
C PERALATAN -
D JUMLAH A + B + C 42,650.00
E OVERHEAD & PROFIT (contoh 15%) 15% 6,397.50
F HARGA SATUAN PEKERJAAN (D+E) 49,047.50
21 A.4.5.2.21 1 m2 Pemasangan Atap Asbes Gelombang (1,80x1,08 m) x 6 mm
A TENAGA 19,670.00
L.01 0.140 OH Pekerja 80,000.00 11,200.00
L.02 0.070 OH Tukang Kayu 100,000.00 7,000.00
L.03 0.007 OH Kepala Tukang 105,000.00 735.00
L.04 0.007 OH Mandor 105,000.00 735.00
B BAHAN 24,060.00
0.570 Lbr Asbes Gelombang 38,000.00 21,660.00
0.120 Kg Paku Pancing 60 x 230 20,000.00 2,400.00
C PERALATAN -
D JUMLAH A + B + C 43,730.00
E OVERHEAD & PROFIT (contoh 15%) 15% 6,559.50
F HARGA SATUAN PEKERJAAN (D+E) 50,289.50
22 A.4.5.2.30 1 m2 Pemasangan Atap Genteng Beton
A TENAGA 28,100.00
L.01 0.200 OH Pekerja 80,000.00 16,000.00

HALAMAN 162 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

L.02 0.100 OH Tukang Kayu 100,000.00 10,000.00


L.03 0.010 OH Kepala Tukang 105,000.00 1,050.00
L.04 0.010 OH Mandor 105,000.00 1,050.00
B BAHAN 83,130.00
11.000 Lbr Genteng Beton Standrad 7,500.00 82,500.00
0.030 Kg Paku Biasa 2" - 5" 21,000.00 630.00
C PERALATAN -
D JUMLAH A + B + C 111,230.00
E OVERHEAD & PROFIT (contoh 15%) 15% 16,684.50
F HARGA SATUAN PEKERJAAN (D+E) 127,914.50

HALAMAN 163 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

23 A.4.5.2.31 1 m2 Pemasangan Atap Genteng Aspal


A TENAGA -
L.01 0.200 OH Pekerja -
L.02 0.300 OH Tukang Kayu -
L.03 0.003 OH Kepala Tukang -
L.04 0.010 OH Mandor -
B BAHAN -
6.900 Buah Genteng Aspal -
0.350 lbr Plywood 6 mm -
0.030 kg Paku Biasa 2" - 5" -
0.500 buah Plastic Aerotor -
C PERALATAN -
D JUMLAH A + B + C -
E OVERHEAD & PROFIT (contoh 15%) 15% -
F HARGA SATUAN PEKERJAAN (D+E) -
24 A.4.5.2.32 1 m2 Pemasangan Atap Genteng Metal polos
A TENAGA 28,100.00
L.01 0.200 OH Pekerja 80,000.00 16,000.00
L.02 0.100 OH Tukang Kayu 100,000.00 10,000.00
L.03 0.010 OH Kepala Tukang 105,000.00 1,050.00
L.04 0.010 OH Mandor 105,000.00 1,050.00
B BAHAN 66,240.00
1.020 m2 Genteng Metal polos 62,000.00 63,240.00
0.200 Kg Paku Biasa Ø ½" - 1" (sekrup) 15,000.00 3,000.00
C PERALATAN -
D JUMLAH A + B + C 94,340.00
E OVERHEAD & PROFIT (contoh 15%) 15% 14,151.00
F HARGA SATUAN PEKERJAAN (D+E) 108,491.00
25 A.4.5.2.34 1 m2 Pemasangan Atap Sirap
A TENAGA 41,745.00
L.01 0.166 OH Pekerja 80,000.00 13,280.00
L.02 0.250 OH Tukang Kayu 100,000.00 25,000.00
L.03 0.025 OH Kepala Tukang 105,000.00 2,625.00
L.04 0.008 OH Mandor 105,000.00 840.00
B BAHAN 57,000.00
30.000 Lbr Genteng Sirap 1,800.00 54,000.00
0.200 Kg Paku Biasa Ø ½" - 1" (sekrup) 15,000.00 3,000.00
C PERALATAN -
D JUMLAH A + B + C 98,745.00
E OVERHEAD & PROFIT (contoh 15%) 15% 14,811.75
F HARGA SATUAN PEKERJAAN (D+E) 113,556.75
26 A.4.5.2.35 1 m' Pemasangan Nok Genteng Beton
A TENAGA 56,200.00
L.01 0.400 OH Pekerja 80,000.00 32,000.00
L.02 0.200 OH Tukang Kayu 100,000.00 20,000.00
L.03 0.020 OH Kepala Tukang 105,000.00 2,100.00
L.04 0.020 OH Mandor 105,000.00 2,100.00
B BAHAN 53,697.00
3.500 Buah Nok Genteng Beton 8,000.00 28,000.00

HALAMAN 164 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

0.050 Kg Paku Biasa 2" - 5" 21,000.00 1,050.00


10.800 Kg Portland Semen 1,120.00 12,096.00
0.032 m3 Pasir Pasang 318,000.00 10,176.00
1.000 Kg Semen Warna 2,375.00 2,375.00
C PERALATAN -
D JUMLAH A + B + C 109,897.00
E OVERHEAD & PROFIT (contoh 15%) 15% 16,484.55
F HARGA SATUAN PEKERJAAN (D+E) 126,381.55

HALAMAN 165 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

27 A.4.5.2.36 1 m' Pemasangan Nok Genteng Aspal


A TENAGA -
L.01 0.125 OH Pekerja -
L.02 0.250 OH Tukang Kayu -
L.03 0.025 OH Kepala Tukang -
L.04 0.006 OH Mandor -
B BAHAN -
2.000 Buah Nok Genteng Beton -
0.050 Kg Paku Biasa 2" - 5" -
0.004 m3 Balok Kayu -
C PERALATAN -
D JUMLAH A + B + C -
E OVERHEAD & PROFIT (contoh 15%) 15% -
F HARGA SATUAN PEKERJAAN (D+E) -
28 A.4.5.2.37 1 m' Pemasangan Nok Genteng Metal
A TENAGA 37,940.00
L.01 0.250 OH Pekerja 80,000.00 20,000.00
L.02 0.150 OH Tukang Kayu 100,000.00 15,000.00
L.03 0.015 OH Kepala Tukang 105,000.00 1,575.00
L.04 0.013 OH Mandor 105,000.00 1,365.00
B BAHAN 30,450.00
1.100 Buah Nok Genteng polos 27,000.00 29,700.00
0.050 Kg Paku Biasa Ø ½" - 1" (sekrup) 15,000.00 750.00
C PERALATAN -
D JUMLAH A + B + C 68,390.00
E OVERHEAD & PROFIT (contoh 15%) 15% 10,258.50
F HARGA SATUAN PEKERJAAN (D+E) 78,648.50
29 A.4.5.2.38 1 m' Pemasangan Nok Sirap
A TENAGA -
L.01 0.125 OH Pekerja -
L.02 0.250 OH Tukang Kayu -
L.03 0.025 OH Kepala Tukang -
L.04 0.006 OH Mandor -
B BAHAN -
0.400 Lbr Seng Plaat 3" x 6" BJLS 28 -
0.060 Kg Paku Biasa 1/2" - 1" -
0.050 Kg Paku Biasa 2" - 5" -
C PERALATAN -
D JUMLAH A + B + C -
E OVERHEAD & PROFIT (contoh 15%) 15% -
F HARGA SATUAN PEKERJAAN (D+E) -
30 A.4.5.2.39 1 m2 Pemasangan Atap Seng Gelombang
A TENAGA 16,860.00
L.01 0.120 OH Pekerja 80,000.00 9,600.00
L.02 0.060 OH Tukang Kayu 100,000.00 6,000.00
L.03 0.006 OH Kepala Tukang 105,000.00 630.00
L.04 0.006 OH Mandor 105,000.00 630.00
B BAHAN 41,020.00
0.700 Lbr Seng Gelombang 3" x 6" BJLS 30 58,000.00 40,600.00

HALAMAN 166 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

0.020 Kg Paku Biasa 1/2" - 1" 21,000.00 420.00


C PERALATAN -
D JUMLAH A + B + C 57,880.00
E OVERHEAD & PROFIT (contoh 15%) 15% 8,682.00
F HARGA SATUAN PEKERJAAN (D+E) 66,562.00
31 A.4.5.2.40 1 m' Pemasangan Atap Nok Seng
A TENAGA 20,365.00
L.01 0.150 OH Pekerja 80,000.00 12,000.00
L.02 0.070 OH Tukang Kayu 100,000.00 7,000.00
L.03 0.007 OH Kepala Tukang 105,000.00 735.00

HALAMAN 167 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

L.04 0.006 OH Mandor 105,000.00 630.00


B BAHAN 8,940.00
0.300 Lbr Seng Plaat 3" x 6" BJLS 28 27,000.00 8,100.00
0.040 Kg Paku Biasa 1/2" - 1" 21,000.00 840.00
C PERALATAN -
D JUMLAH A + B + C 29,305.00
E OVERHEAD & PROFIT (contoh 15%) 15% 4,395.75
F HARGA SATUAN PEKERJAAN (D+E) 33,700.75
32 A.4.5.2.43 1 m2 Pasang Allumunium Foil / Sisalation
A TENAGA 18,365.00
L.01 0.150 OH Pekerja 80,000.00 12,000.00
L.02 0.050 OH Tukang Kayu 100,000.00 5,000.00
L.03 0.005 OH Kepala Tukang 105,000.00 525.00
L.04 0.008 OH Mandor 105,000.00 840.00
B BAHAN 57,750.00
1.050 m2 Sisalation / Allumunium Foil 55,000.00 57,750.00
C PERALATAN -
D JUMLAH A + B + C 76,115.00
E OVERHEAD & PROFIT (contoh 15%) 15% 11,417.25
F HARGA SATUAN PEKERJAAN (D+E) 87,532.25
XI A.4.6.1 HARGA SATUAN PEKERJAAN KAYU
1 A.4.6.1.1 1 m3 Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu klas I
A TENAGA 2,917,250.00
L.01 7.000 OH Pekerja 80,000.00 560,000.00
L.02 21.000 OH Tukang Kayu 100,000.00 2,100,000.00
L.03 2.100 OH Kepala Tukang 105,000.00 220,500.00
L.04 0.350 OH Mandor 105,000.00 36,750.00
B BAHAN 11,926,250.00
1.100 m3 Kayu Klas I (Jati) , Balok 10,800,000.00 11,880,000.00
1.250 kg Paku Biasa 2" - 5 " 21,000.00 26,250.00
1.000 kg Lem Kayu 20,000.00 20,000.00
C PERALATAN -
D JUMLAH A + B + C 14,843,500.00
E OVERHEAD & PROFIT (contoh 15%) 15% 2,226,525.00
F HARGA SATUAN PEKERJAAN (D+E) 17,070,025.00
2 A.4.6.1.2 1 m3 Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu klas II atau III
A TENAGA 2,500,500.00
L.01 6.000 OH Pekerja 80,000.00 480,000.00
L.02 18.000 OH Tukang Kayu 100,000.00 1,800,000.00
L.03 1.800 OH Kepala Tukang 105,000.00 189,000.00
L.04 0.300 OH Mandor 105,000.00 31,500.00
B BAHAN 15,406,250.00
1.200 m3 Kayu Klas II (Kamfer) , Balok 12,800,000.00 15,360,000.00
1.250 kg Paku Biasa 2" - 5 " 21,000.00 26,250.00
1.000 kg Lem Kayu 20,000.00 20,000.00
C PERALATAN -
D JUMLAH A + B + C 17,906,750.00
E OVERHEAD & PROFIT (contoh 15%) 15% 2,686,012.50
F HARGA SATUAN PEKERJAAN (D+E) 20,592,762.50

HALAMAN 168 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

3 A.4.6.1.3 1 m2 Pembuatan & Pemasangan Pintu KlampStandard Kayu Klas II (Kayu Kamfer)
A TENAGA 145,915.00
L.01 0.350 OH Pekerja 80,000.00 28,000.00
L.02 1.050 OH Tukang Kayu 100,000.00 105,000.00
L.03 0.105 OH Kepala Tukang 105,000.00 11,025.00
L.04 0.018 OH Mandor 105,000.00 1,890.00
B BAHAN 545,050.00
0.040 m3 Kayu Klas II (Kamfer), papan 13,600,000.00 544,000.00
0.050 Kg Paku Biasa 2" - 5 " 21,000.00 1,050.00

HALAMAN 169 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

C PERALATAN -
D JUMLAH A + B + C 690,965.00
E OVERHEAD & PROFIT (contoh 15%) 15% 103,644.75
F HARGA SATUAN PEKERJAAN (D+E) 794,609.75
4 A.4.6.1.4 1 m2 Pembuatan & Pemasangan Daun Pintu Klamp Sederhana Kayu Klas III
A TENAGA 145,915.00
L.01 0.350 OH Pekerja 80,000.00 28,000.00
L.02 1.050 OH Tukang Kayu 100,000.00 105,000.00
L.03 0.105 OH Kepala Tukang 105,000.00 11,025.00
L.04 0.018 OH Mandor 105,000.00 1,890.00
B BAHAN 545,050.00
0.040 m3 Kayu Klas II (Kamfer), papan 13,600,000.00 544,000.00
0.050 Kg Paku Biasa 2" - 5 " 21,000.00 1,050.00
C PERALATAN -
D JUMLAH A + B + C 690,965.00
E OVERHEAD & PROFIT (contoh 15%) 15% 103,644.75
F HARGA SATUAN PEKERJAAN (D+E) 794,609.75
5 A.4.6.1.5 1 m2 Pembuatan & Pemasangan Daun Pintu Panel, Kayu Klas I atau II
A TENAGA 416,750.00
L.01 1.000 OH Pekerja 80,000.00 80,000.00
L.02 3.000 OH Tukang Kayu 100,000.00 300,000.00
L.03 0.300 OH Kepala Tukang 105,000.00 31,500.00
L.04 0.050 OH Mandor 105,000.00 5,250.00
B BAHAN 545,000.00
0.040 m3 Kayu Klas II (Kamfer), papan 13,600,000.00 544,000.00
0.050 kg Lem Kayu 20,000.00 1,000.00
C PERALATAN -
D JUMLAH A + B + C 961,750.00
E OVERHEAD & PROFIT (contoh 15%) 15% 144,262.50
F HARGA SATUAN PEKERJAAN (D+E) 1,106,012.50
6 A.4.6.1.6 1 m2 Pembuatan & Pemasangan Pintu & Jendela Kaca Kayu Klas I atau II
A TENAGA 333,400.00
L.01 0.800 OH Pekerja 80,000.00 64,000.00
L.02 2.400 OH Tukang Kayu 100,000.00 240,000.00
L.03 0.240 OH Kepala Tukang 105,000.00 25,200.00
L.04 0.040 OH Mandor 105,000.00 4,200.00
B BAHAN 332,400.00
0.024 m3 Kayu Klas II (Kamfer), papan 13,600,000.00 326,400.00
0.300 kg Lem Kayu 20,000.00 6,000.00
C PERALATAN -
D JUMLAH A + B + C 665,800.00
E OVERHEAD & PROFIT (contoh 15%) 15% 99,870.00
F HARGA SATUAN PEKERJAAN (D+E) 765,670.00
7 A.4.6.1.7 1 m2 Pembuatan & Pemasangan Pintu & Jendela Jalusi Kayu Klas I atau II (jati)
A TENAGA 416,750.00
L.01 1.000 OH Pekerja 80,000.00 80,000.00
L.02 3.000 OH Tukang Kayu 100,000.00 300,000.00
L.03 0.300 OH Kepala Tukang 105,000.00 31,500.00
L.04 0.050 OH Mandor 105,000.00 5,250.00

HALAMAN 170 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

B BAHAN 714,000.00
0.064 m3 Kayu Klas I (Jati), papan 11,000,000.00 704,000.00
0.500 kg Lem Kayu 20,000.00 10,000.00
C PERALATAN -
D JUMLAH A + B + C 1,130,750.00
E OVERHEAD & PROFIT (contoh 15%) 15% 169,612.50
F HARGA SATUAN PEKERJAAN (D+E) 1,300,362.50

HALAMAN 171 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

8 A.4.6.1.8 1 m2 Pembuatan&Pemasangan Pintu kayu lapis (Plywood) Rangkap


rangka Kayu Klas II (lbr s/d 90 cm)
A TENAGA 291,725.00
L.01 0.700 OH Pekerja 80,000.00 56,000.00
L.02 2.100 OH Tukang Kayu 100,000.00 210,000.00
L.03 0.210 OH Kepala Tukang 105,000.00 22,050.00
L.04 0.035 OH Mandor 105,000.00 3,675.00
B BAHAN 510,630.00
0.025 m3 Kayu Klas II (Kamfer), papan 13,600,000.00 340,000.00
0.030 Kg Paku Biasa 1/2" - 1" 21,000.00 630.00
0.500 Ltr Lem Kayu 20,000.00 10,000.00
1.000 Lbr Teakwood tebal 4 mm uk.90x220cm 160,000.00 160,000.00
C PERALATAN -
D JUMLAH A + B + C 802,355.00
E OVERHEAD & PROFIT (contoh 15%) 15% 120,353.25
F HARGA SATUAN PEKERJAAN (D+E) 922,708.25
9 A.4.6.1.9 1 m2 Pembuatan&Pemasangan Pintu Plywood rangkap, rangka expose kayu klas I atau II
A TENAGA 333,400.00
L.01 0.800 OH Pekerja 80,000.00 64,000.00
L.02 2.400 OH Tukang Kayu 100,000.00 240,000.00
L.03 0.240 OH Kepala Tukang 105,000.00 25,200.00
L.04 0.040 OH Mandor 105,000.00 4,200.00
B BAHAN 518,790.00
0.026 m3 Kayu Klas II (Kamfer), papan 13,600,000.00 348,160.00
0.030 Kg Paku Biasa 1/2" - 1" 21,000.00 630.00
0.500 Ltr Lem Kayu 20,000.00 10,000.00
1.000 Lbr Teakwood tebal 4 mm uk.90x210cm 160,000.00 160,000.00
C PERALATAN -
D JUMLAH A + B + C 852,190.00
E OVERHEAD & PROFIT (contoh 15%) 15% 127,828.50
F HARGA SATUAN PEKERJAAN (D+E) 980,018.50
10 A.4.6.1.10 1 m2 Pembuatan & Pemasangan Jalusi mati Kosen Kayu Klas I atau II
A TENAGA 309,775.00
L.01 0.670 OH Pekerja 80,000.00 53,600.00
L.02 2.000 OH Tukang Kayu 100,000.00 200,000.00
L.03 0.200 OH Kepala Tukang 105,000.00 21,000.00
L.04 0.335 OH Mandor 105,000.00 35,175.00
B BAHAN 663,150.00
0.060 m3 Kayu Klas I (Jati), papan 11,000,000.00 660,000.00
0.150 Kg Paku Biasa 1/2" - 1" 21,000.00 3,150.00
C PERALATAN -
D JUMLAH A + B + C 972,925.00
E OVERHEAD & PROFIT (contoh 15%) 15% 145,938.75
F HARGA SATUAN PEKERJAAN (D+E) 1,118,863.75
11 A.4.6.1.11 1 m2 Pembuatan & Pemasangan Pintu Teakwood Rangkap, Rangka Expose Kayu Klas I
A TENAGA 333,400.00
L.01 0.800 OH Pekerja 80,000.00 64,000.00
L.02 2.400 OH Tukang Kayu 100,000.00 240,000.00
L.03 0.240 OH Kepala Tukang 105,000.00 25,200.00

HALAMAN 172 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

L.04 0.040 OH Mandor 105,000.00 4,200.00


B BAHAN 441,630.00
0.025 m3 Kayu Klas I (Jati), papan 11,000,000.00 275,000.00
0.030 Kg Paku Biasa 1/2" - 1" 21,000.00 630.00
0.300 kg Lem Kayu 20,000.00 6,000.00
1.000 Lbr Teakwood tebal 4 mm uk.90x210cm 160,000.00 160,000.00
C PERALATAN -
D JUMLAH A + B + C 775,030.00
E OVERHEAD & PROFIT (contoh 15%) 15% 116,254.50
F HARGA SATUAN PEKERJAAN (D+E) 891,284.50

HALAMAN 173 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

12 A.4.6.1.12 1 m2 Pembuatan & Pemasangan Pintu Teakwood Rangkap Lapis Formika,


Rangka expose Kayu Klas II
A TENAGA 354,290.00
L.01 0.850 OH Pekerja 80,000.00 68,000.00
L.02 2.550 OH Tukang Kayu 100,000.00 255,000.00
L.03 0.255 OH Kepala Tukang 105,000.00 26,775.00
L.04 0.043 OH Mandor 105,000.00 4,515.00
B BAHAN 455,230.00
0.025 m3 Kayu Klas II (Kamfer), papan 13,600,000.00 340,000.00
0.030 Kg Paku Biasa 1/2" - 1" 21,000.00 630.00
0.080 kg Lem Kayu 20,000.00 1,600.00
1.000 Lbr Teakwood tebal 4 mm uk.90x210cm 85,000.00 85,000.00
0.500 Lbr Formika 56,000.00 28,000.00
C PERALATAN -
D JUMLAH A + B + C 809,520.00
E OVERHEAD & PROFIT (contoh 15%) 15% 121,428.00
F HARGA SATUAN PEKERJAAN (D+E) 930,948.00
13 A.4.6.1.13 1 m3 Pembuatan & Memasang Konstruksi Kuda-kuda Konvensional
Kayu I; II & III Bentang 6 meter
A TENAGA 1,667,000.00
L.01 4.000 OH Pekerja 80,000.00 320,000.00
L.02 12.000 OH Tukang Kayu 100,000.00 1,200,000.00
L.03 1.200 OH Kepala Tukang 105,000.00 126,000.00
L.04 0.200 OH Mandor 105,000.00 21,000.00
B BAHAN 14,422,600.00
1.100 m3 Kayu Kamfer, balok 12,800,000.00 14,080,000.00
15.000 Kg Besi Strip 15,000.00 225,000.00
5.600 Kg Paku Biasa 2" - 5" 21,000.00 117,600.00
C PERALATAN -
D JUMLAH A + B + C 16,089,600.00
E OVERHEAD & PROFIT (contoh 15%) 15% 2,413,440.00
F HARGA SATUAN PEKERJAAN (D+E) 18,503,040.00
14 A.4.6.1.14 1 m3 Pembuatan&Pemasangan Konstruksi Kuda-kuda Expose, Kayu Klas I
A TENAGA 2,792,225.00
L.01 6.700 OH Pekerja 80,000.00 536,000.00
L.02 20.100 OH Tukang Kayu 100,000.00 2,010,000.00
L.03 2.010 OH Kepala Tukang 105,000.00 211,050.00
L.04 0.335 OH Mandor 105,000.00 35,175.00
B BAHAN 13,302,600.00
1.200 m3 Kayu Klas I (jati), balok 10,800,000.00 12,960,000.00
15.000 Kg Besi Strip 15,000.00 225,000.00
5.600 Kg Paku Biasa 2" - 5" 21,000.00 117,600.00
C PERALATAN -
D JUMLAH A + B + C 16,094,825.00
E OVERHEAD & PROFIT (contoh 15%) 15% 2,414,223.75
F HARGA SATUAN PEKERJAAN (D+E) 18,509,048.75
15 A.4.6.1.15 1 m3 Pemasangan konstruksi Gording, Kayu Klas II
A TENAGA 1,000,200.00
L.01 2.400 OH Pekerja 80,000.00 192,000.00

HALAMAN 174 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

L.02 7.200 OH Tukang Kayu 100,000.00 720,000.00


L.03 0.720 OH Kepala Tukang 105,000.00 75,600.00
L.04 0.120 OH Mandor 105,000.00 12,600.00
B BAHAN 14,368,000.00
1.100 m3 Kayu Klas I (Kamfer), balok 12,800,000.00 14,080,000.00
15.000 Kg Besi Strip 15,000.00 225,000.00

HALAMAN 175 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

3.000 Kg Paku Biasa 2" - 5" 21,000.00 63,000.00


C PERALATAN -
D JUMLAH A + B + C 15,368,200.00
E OVERHEAD & PROFIT (contoh 15%) 15% 2,305,230.00
F HARGA SATUAN PEKERJAAN (D+E) 17,673,430.00
16 A.4.6.1.16 1 m2 Pemasangan Rangka Atap Genteng Keramik, Kayu Klas II
A TENAGA 19,575.00
L.01 0.100 OH Pekerja 80,000.00 8,000.00
L.02 0.100 OH Tukang Kayu 100,000.00 10,000.00
L.03 0.010 OH Kepala Tukang 105,000.00 1,050.00
L.04 0.005 OH Mandor 105,000.00 525.00
B BAHAN 230,530.00
0.014 m3 Kayu Klas II (Kamfer), Kaso-kaso (5x7) cm 12,800,000.00 179,200.00
0.004 m3 Reng (2x3) cm 12,800,000.00 46,080.00
0.250 Kg Paku Biasa 2" - 5" 21,000.00 5,250.00
C PERALATAN -
D JUMLAH A + B + C 250,105.00
E OVERHEAD & PROFIT (contoh 15%) 15% 37,515.75
F HARGA SATUAN PEKERJAAN (D+E) 287,620.75
17 A.4.6.1.17 1 m2 Pemasangan Rangka Atap Genteng Beton, Kayu Klas II
A TENAGA 19,575.00
L.01 0.100 OH Pekerja 80,000.00 8,000.00
L.02 0.100 OH Tukang Kayu 100,000.00 10,000.00
L.03 0.010 OH Kepala Tukang 105,000.00 1,050.00
L.04 0.005 OH Mandor 105,000.00 525.00
B BAHAN 276,610.00
0.014 m3 Kayu Klas II (Kamfer), Kaso-kaso (5x7) cm 12,800,000.00 179,200.00
0.007 m3 Reng (2x3) cm 12,800,000.00 92,160.00
0.250 Kg Paku Biasa 2" - 5" 21,000.00 5,250.00
C PERALATAN -
D JUMLAH A + B + C 296,185.00
E OVERHEAD & PROFIT (contoh 15%) 15% 44,427.75
F HARGA SATUAN PEKERJAAN (D+E) 340,612.75
18 A.4.6.1.18 1 m2 Pemasangan Rangka Atap Sirap, Kayu Klas II
A TENAGA 23,490.00
L.01 0.120 OH Pekerja 80,000.00 9,600.00
L.02 0.120 OH Tukang Kayu 100,000.00 12,000.00
L.03 0.012 OH Kepala Tukang 105,000.00 1,260.00
L.04 0.006 OH Mandor 105,000.00 630.00
B BAHAN 183,400.00
0.014 m3 Kayu Klas II (Kamfer), balok 12,800,000.00 179,200.00
0.200 Kg Paku Biasa 2" - 5" 21,000.00 4,200.00
C PERALATAN -
D JUMLAH A + B + C 206,890.00
E OVERHEAD & PROFIT (contoh 15%) 15% 31,033.50
F HARGA SATUAN PEKERJAAN (D+E) 237,923.50
19 A.4.6.1.19 1 m2 Pemasangan Rangka Langit-langit (50x1,00) m, kayu Klas II atau III
A TENAGA 53,025.00
L.01 0.150 OH Pekerja 80,000.00 12,000.00

HALAMAN 176 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

L.02 0.300 OH Tukang Kayu 100,000.00 30,000.00


L.03 0.030 OH Kepala Tukang 105,000.00 3,150.00
L.04 0.075 OH Mandor 105,000.00 7,875.00
B BAHAN 201,320.00
0.015 m3 Kayu Klas II (Kamfer), balok 12,800,000.00 197,120.00
0.200 Kg Paku Biasa 2" - 5" 21,000.00 4,200.00
C PERALATAN -
D JUMLAH A + B + C 254,345.00
E OVERHEAD & PROFIT (contoh 15%) 15% 38,151.75
F HARGA SATUAN PEKERJAAN (D+E) 292,496.75

HALAMAN 177 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

20 A.4.6.1.20 1 m2 Pemasangan Rangka Langit-langit (60x60) cm, kayu Klas II atau III
A TENAGA 50,200.00
L.01 0.200 OH Pekerja 80,000.00 16,000.00
L.02 0.300 OH Tukang Kayu 100,000.00 30,000.00
L.03 0.030 OH Kepala Tukang 105,000.00 3,150.00
L.04 0.010 OH Mandor 105,000.00 1,050.00
B BAHAN 213,890.00
0.016 m3 Kayu Klas II (Kamfer), balok 12,800,000.00 208,640.00
0.250 Kg Paku Biasa 2" - 5" 21,000.00 5,250.00
C PERALATAN -
D JUMLAH A + B + C 264,090.00
E OVERHEAD & PROFIT (contoh 15%) 15% 39,613.50
F HARGA SATUAN PEKERJAAN (D+E) 303,703.50
21 A.4.6.1.21 1 m' Pemasangan Listplank Uk. (3x20)cm Kayu klas I atau II
A TENAGA 30,625.00
L.01 0.100 OH Pekerja 80,000.00 8,000.00
L.02 0.200 OH Tukang Kayu 100,000.00 20,000.00
L.03 0.020 OH Kepala Tukang 105,000.00 2,100.00
L.04 0.005 OH Mandor 105,000.00 525.00
B BAHAN 120,900.00
0.011 m3 Kayu klas I (Jati), papan 11,000,000.00 118,800.00
0.100 Kg Paku Biasa 2" - 5" 21,000.00 2,100.00
C PERALATAN -
D JUMLAH A + B + C 151,525.00
E OVERHEAD & PROFIT (contoh 15%) 15% 22,728.75
F HARGA SATUAN PEKERJAAN (D+E) 174,253.75
22 A.4.6.1.22 1 m' Pemasangan Listplank Uk. (3x30)cm Kayu klas I atau klas II
A TENAGA 30,625.00
L.01 0.100 OH Pekerja 80,000.00 8,000.00
L.02 0.200 OH Tukang Kayu 100,000.00 20,000.00
L.03 0.020 OH Kepala Tukang 105,000.00 2,100.00
L.04 0.005 OH Mandor 105,000.00 525.00
B BAHAN 150,650.00
0.011 m3 Kayu klas II (Kamfer), papan 13,600,000.00 149,600.00
0.050 Kg Paku Biasa 2" - 5" 21,000.00 1,050.00
C PERALATAN -
D JUMLAH A + B + C 181,275.00
E OVERHEAD & PROFIT (contoh 15%) 15% 27,191.25
F HARGA SATUAN PEKERJAAN (D+E) 208,466.25
23 A.4.6.1.23 1 m2 Pemasangan Rangka Dinding Pemisah (60x120) cm Kayu klas II atau III
A TENAGA 62,565.00
L.01 0.150 OH Pekerja 80,000.00 12,000.00
L.02 0.450 OH Tukang Kayu 100,000.00 45,000.00
L.03 0.045 OH Kepala Tukang 105,000.00 4,725.00
L.04 0.008 OH Mandor 105,000.00 840.00
B BAHAN 361,550.00
0.028 m3 Kayu klas II (Kamfer), balok 12,800,000.00 358,400.00
0.150 Kg Paku Biasa 2" - 5" 21,000.00 3,150.00
C PERALATAN -

HALAMAN 178 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

D JUMLAH A + B + C 424,115.00
E OVERHEAD & PROFIT (contoh 15%) 15% 63,617.25
F HARGA SATUAN PEKERJAAN (D+E) 487,732.25
24 A.4.6.1.24 1 m2 Pemasangan Dinding Pemisah Tripleks Rangkap Rangka Kayu Klas II
A TENAGA 62,565.00
L.01 0.150 OH Pekerja 80,000.00 12,000.00
L.02 0.450 OH Tukang Kayu 100,000.00 45,000.00
L.03 0.045 OH Kepala Tukang 105,000.00 4,725.00
L.04 0.008 OH Mandor 105,000.00 840.00

HALAMAN 179 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

B BAHAN 445,850.00
0.028 m3 Kayu klas II (Kamfer), balok 12,800,000.00 358,400.00
0.150 Kg Paku Biasa 2" - 5" 21,000.00 3,150.00
0.860 Lbr TRipleks 120 x 240 cm tebal 4mm 85,000.00 73,100.00
0.560 Ltr Lem 20,000.00 11,200.00
C PERALATAN -
D JUMLAH A + B + C 508,415.00
E OVERHEAD & PROFIT (contoh 15%) 15% 76,262.25
F HARGA SATUAN PEKERJAAN (D+E) 584,677.25
25 A.4.6.1.25 1 m2 Pemasangan Dinding Pemisah Tripleks Rangkap Rangka Kayu Klas II
A TENAGA 68,950.00
L.01 0.020 OH Pekerja 80,000.00 1,600.00
L.02 0.600 OH Tukang Kayu 100,000.00 60,000.00
L.03 0.060 OH Kepala Tukang 105,000.00 6,300.00
L.04 0.010 OH Mandor 105,000.00 1,050.00
B BAHAN 445,850.00
0.028 m3 Kayu klas II (Kamfer), balok 12,800,000.00 358,400.00
0.150 Kg Paku Biasa 2" - 5" 21,000.00 3,150.00
0.860 Lbr Tripleks 120 x 240 cm tebal 4mm 85,000.00 73,100.00
0.560 Ltr Lem 20,000.00 11,200.00
C PERALATAN -
D JUMLAH A + B + C 514,800.00
E OVERHEAD & PROFIT (contoh 15%) 15% 77,220.00
F HARGA SATUAN PEKERJAAN (D+E) 592,020.00
26 A.4.6.1.26 1 m2 Pemasangan Dinding Lambriziring dari Papan Kelas I
A TENAGA 250,050.00
L.01 0.600 OH Pekerja 80,000.00 48,000.00
L.02 1.800 OH Tukang Kayu 100,000.00 180,000.00
L.03 0.180 OH Kepala Tukang 105,000.00 18,900.00
L.04 0.030 OH Mandor 105,000.00 3,150.00
B BAHAN 81,350.00
0.007 m3 Kayu klas I (Jati), papan 11,000,000.00 77,000.00
0.100 Kg Paku Biasa 2" - 5" 21,000.00 2,100.00
0.150 Kg Paku Sekrup 3,5" 15,000.00 2,250.00
C PERALATAN -
D JUMLAH A + B + C 331,400.00
E OVERHEAD & PROFIT (contoh 15%) 15% 49,710.00
F HARGA SATUAN PEKERJAAN (D+E) 381,110.00
27 A.4.6.1.27 1 m2 Pemasangan Dinding Lambriziring dari Plywood ukuran (120x240) cm
A TENAGA 10,445.00
L.01 0.025 OH Pekerja 80,000.00 2,000.00
L.02 0.075 OH Tukang Kayu 100,000.00 7,500.00
L.03 0.008 OH Kepala Tukang 105,000.00 840.00
L.04 0.001 OH Mandor 105,000.00 105.00
B BAHAN 35,050.00
0.400 Lbr Tripleks(120 X 240) cm x 4mm 85,000.00 34,000.00
0.050 Kg Paku Biasa 1/2" - 1" 21,000.00 1,050.00
C PERALATAN -
D JUMLAH A + B + C 45,495.00

HALAMAN 180 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

E OVERHEAD & PROFIT (contoh 15%) 15% 6,824.25


F HARGA SATUAN PEKERJAAN (D+E) 52,319.25
28 A.4.6.1.28 1 m2 Pemasangan Dinding Bilik, Rangka Kayu Klas III atau IV
A TENAGA -
L.01 0.100 OH Pekerja -
L.02 0.050 OH Tukang Kayu -
L.03 0.005 OH Kepala Tukang -
L.04 0.005 OH Mandor -

HALAMAN 181 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

B BAHAN -
1.500 m2 Bilik Bambu -
0.014 m3 Kayu Klas III (Meranti) -
0.012 Kg Paku Biasa 1/2" - 1" -
0.003 m' List Kayu 2/4 -
C PERALATAN -
D JUMLAH A + B + C -
E OVERHEAD & PROFIT (contoh 15%) 15% -
F HARGA SATUAN PEKERJAAN (D+E) -
XII A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI dan KACA
1 A.4.6.2.2 1 Buah Pemasangan Kunci Tanam Biasa
A TENAGA 52,375.00
L.01 0.010 OH Pekerja 80,000.00 800.00
L.02 0.500 OH Tukang Kayu 100,000.00 50,000.00
L.03 0.010 OH Kepala Tukang 105,000.00 1,050.00
L.04 0.005 OH Mandor 105,000.00 525.00
B BAHAN 70,000.00
1.000 Buah Kunci Tanam Biasa 70,000.00 70,000.00
C PERALATAN -
D JUMLAH A + B + C 122,375.00
E OVERHEAD & PROFIT (contoh 15%) 15% 18,356.25
F HARGA SATUAN PEKERJAAN (D+E) 140,731.25
2 A.4.6.2.3 1 Buah Pemasangan Kunci Kamar Mandi
A TENAGA 51,187.50
L.01 0.005 OH Pekerja 80,000.00 400.00
L.02 0.500 OH Tukang Kayu 100,000.00 50,000.00
L.03 0.005 OH Kepala Tukang 105,000.00 525.00
L.04 0.003 OH Mandor 105,000.00 262.50
B BAHAN 70,000.00
1.000 Buah Kunci Tanam Kamar Mandi 70,000.00 70,000.00
C PERALATAN -
D JUMLAH A + B + C 121,187.50
E OVERHEAD & PROFIT (contoh 15%) 15% 18,178.13
F HARGA SATUAN PEKERJAAN (D+E) 139,365.63
3 A.4.6.2.4 1 Buah Pemasangan Kunci Selinder
A TENAGA 51,187.50
L.01 0.005 OH Pekerja 80,000.00 400.00
L.02 0.500 OH Tukang Kayu 100,000.00 50,000.00
L.03 0.005 OH Kepala Tukang 105,000.00 525.00
L.04 0.003 OH Mandor 105,000.00 262.50
B BAHAN 75,000.00
1.000 Buah Kunci Selinder 75,000.00 75,000.00
C PERALATAN -
D JUMLAH A + B + C 126,187.50
E OVERHEAD & PROFIT (contoh 15%) 15% 18,928.13
F HARGA SATUAN PEKERJAAN (D+E) 145,115.63
4 A.4.6.2.5 1 Buah Pemasangan Engsel Pintu
A TENAGA 18,562.50
L.01 0.015 OH Pekerja 80,000.00 1,200.00

HALAMAN 182 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

L.02 0.150 OH Tukang Kayu 100,000.00 15,000.00


L.03 0.015 OH Kepala Tukang 105,000.00 1,575.00
L.04 0.008 OH Mandor 105,000.00 787.50
B BAHAN 25,000.00
1.000 Buah Engsel pintu 25,000.00 25,000.00
C PERALATAN -
D JUMLAH A + B + C 43,562.50
E OVERHEAD & PROFIT (contoh 15%) 15% 6,534.38
F HARGA SATUAN PEKERJAAN (D+E) 50,096.88

HALAMAN 183 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

5 A.4.6.2.6 1 Buah Pemasangan Engsel Jendela Kupu-kupu


A TENAGA 12,375.00
L.01 0.010 OH Pekerja 80,000.00 800.00
L.02 0.100 OH Tukang Kayu 100,000.00 10,000.00
L.03 0.010 OH Kepala Tukang 105,000.00 1,050.00
L.04 0.005 OH Mandor 105,000.00 525.00
B BAHAN 8,500.00
1.000 Buah Engsel Jendela 8,500.00 8,500.00
C PERALATAN -
D JUMLAH A + B + C 20,875.00
E OVERHEAD & PROFIT (contoh 15%) 15% 3,131.25
F HARGA SATUAN PEKERJAAN (D+E) 24,006.25
6 A.4.6.2.7 1 Buah Pemasangan Engsel Angin
A TENAGA 30,152.50
L.01 0.100 OH Pekerja 80,000.00 8,000.00
L.02 0.200 OH Tukang Kayu 100,000.00 20,000.00
L.03 0.020 OH Kepala Tukang 105,000.00 2,100.00
L.04 0.001 OH Mandor 105,000.00 52.50
B BAHAN 16,000.00
1.000 Buah Engsel Angin 16,000.00 16,000.00
C PERALATAN -
D JUMLAH A + B + C 46,152.50
E OVERHEAD & PROFIT (contoh 15%) 15% 6,922.88
F HARGA SATUAN PEKERJAAN (D+E) 53,075.38
7 A.4.6.2.9 1 Buah Pemasangan Kait Angin
A TENAGA 18,615.00
L.01 0.015 OH Pekerja 80,000.00 1,200.00
L.02 0.150 OH Tukang Kayu 100,000.00 15,000.00
L.03 0.015 OH Kepala Tukang 105,000.00 1,575.00
L.04 0.008 OH Mandor 105,000.00 840.00
B BAHAN 15,000.00
1.000 Buah Kait Angin 15,000.00 15,000.00
C PERALATAN -
D JUMLAH A + B + C 33,615.00
E OVERHEAD & PROFIT (contoh 15%) 15% 5,042.25
F HARGA SATUAN PEKERJAAN (D+E) 38,657.25
8 A.4.6.2.10 1 Buah Pasang Door Closer
A TENAGA 59,512.50
L.01 0.050 OH Pekerja 80,000.00 4,000.00
L.02 0.500 OH Tukang Kayu 100,000.00 50,000.00
L.03 0.050 OH Kepala Tukang 105,000.00 5,250.00
L.04 0.003 OH Mandor 105,000.00 262.50
B BAHAN 195,000.00
1.000 Buah Door Closer 195,000.00 195,000.00
C PERALATAN -
D JUMLAH A + B + C 254,512.50
E OVERHEAD & PROFIT (contoh 15%) 15% 38,176.88
F HARGA SATUAN PEKERJAAN (D+E) 292,689.38
9 A.4.6.2.11 1 Buah Pemasangan Kunci Selot

HALAMAN 184 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

A TENAGA 23,805.00
L.01 0.020 OH Pekerja 80,000.00 1,600.00
L.02 0.200 OH Tukang Kayu 100,000.00 20,000.00
L.03 0.020 OH Kepala Tukang 105,000.00 2,100.00
L.04 0.001 OH Mandor 105,000.00 105.00

HALAMAN 185 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

B BAHAN 20,000.00
1.000 Buah Kunci Selot 20,000.00 20,000.00
C PERALATAN -
D JUMLAH A + B + C 43,805.00
E OVERHEAD & PROFIT (contoh 15%) 15% 6,570.75
F HARGA SATUAN PEKERJAAN (D+E) 50,375.75
10 A.4.6.2.13 1 Buah Pemasangan Door Stop
A TENAGA 11,902.50
L.01 0.010 OH Pekerja 80,000.00 800.00
L.02 0.100 OH Tukang Kayu 100,000.00 10,000.00
L.03 0.010 OH Kepala Tukang 105,000.00 1,050.00
L.04 0.001 OH Mandor 105,000.00 52.50
B BAHAN 150,000.00
1.000 Buah Door Stop 150,000.00 150,000.00
C PERALATAN -
D JUMLAH A + B + C 161,902.50
E OVERHEAD & PROFIT (contoh 15%) 15% 24,285.38
F HARGA SATUAN PEKERJAAN (D+E) 186,187.88
11 A.4.6.2.14 1 Buah Pemasangan Rel Pintu Dorong
A TENAGA 71,415.00
L.01 0.060 OH Pekerja 80,000.00 4,800.00
L.02 0.600 OH Tukang Kayu 100,000.00 60,000.00
L.03 0.060 OH Kepala Tukang 105,000.00 6,300.00
L.04 0.003 OH Mandor 105,000.00 315.00
B BAHAN 235,000.00
1.000 Buah Rel Pintu Dorong 235,000.00 235,000.00
C PERALATAN -
D JUMLAH A + B + C 306,415.00
E OVERHEAD & PROFIT (contoh 15%) 15% 45,962.25
F HARGA SATUAN PEKERJAAN (D+E) 352,377.25
12 A.4.6.2.15 1 Buah Pemasangan Kunci Lemari
A TENAGA -
L.01 0.025 OH Pekerja -
L.02 0.250 OH Tukang Kayu -
L.03 0.025 OH Kepala Tukang -
L.04 0.001 OH Mandor -
B BAHAN -
1.000 Buah Kunci Lemari -
C PERALATAN -
D JUMLAH A + B + C -
E OVERHEAD & PROFIT (contoh 15%) 15% -
F HARGA SATUAN PEKERJAAN (D+E) -
13 A.4.6.2.16 1 m2 Pemasangan Kaca tebal 3 mm
A TENAGA 17,853.75
L.01 0.015 OH Pekerja 80,000.00 1,200.00
L.02 0.150 OH Tukang Kayu 100,000.00 15,000.00
L.03 0.015 OH Kepala Tukang 105,000.00 1,575.00
L.04 0.001 OH Mandor 105,000.00 78.75
B BAHAN 137,500.00

HALAMAN 186 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

1.100 m2 Kaca tebal 3mm 125,000.00 137,500.00


C PERALATAN -
D JUMLAH A + B + C 155,353.75
E OVERHEAD & PROFIT (contoh 15%) 15% 23,303.06
F HARGA SATUAN PEKERJAAN (D+E) 178,656.81
14 A.4.6.2.17 1 m2 Pemasangan Kaca tebal 5 mm
A TENAGA 17,853.75
L.01 0.015 OH Pekerja 80,000.00 1,200.00
L.02 0.150 OH Tukang Kayu 100,000.00 15,000.00
L.03 0.015 OH Kepala Tukang 105,000.00 1,575.00

HALAMAN 187 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

L.04 0.001 OH Mandor 105,000.00 78.75


B BAHAN 165,000.00
1.100 m2 Kaca tebal 5mm 150,000.00 165,000.00
C PERALATAN -
D JUMLAH A + B + C 182,853.75
E OVERHEAD & PROFIT (contoh 15%) 15% 27,428.06
F HARGA SATUAN PEKERJAAN (D+E) 210,281.81
15 A.4.6.2.18 1 m2 Pemasangan Kaca Cermin tebal 5 mm
A TENAGA 17,853.75
L.01 0.015 OH Pekerja 80,000.00 1,200.00
L.02 0.150 OH Tukang Kayu 100,000.00 15,000.00
L.03 0.015 OH Kepala Tukang 105,000.00 1,575.00
L.04 0.001 OH Mandor 105,000.00 78.75
B BAHAN 643,500.00
1.100 m2 Kaca Cermin 585,000.00 643,500.00
C PERALATAN -
D JUMLAH A + B + C 661,353.75
E OVERHEAD & PROFIT (contoh 15%) 15% 99,203.06
F HARGA SATUAN PEKERJAAN (D+E) 760,556.81
XIII A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN
1 A.4.7.1.1 1 m2 Pengikisan / pengerokan Permukaan Cat Tembok Lama
A TENAGA 12,315.00
L.01 0.150 OH Pekerja 80,000.00 12,000.00
L.04 0.003 OH Mandor 105,000.00 315.00
B BAHAN 5,750.00
0.050 Kg Soda Api 115,000.00 5,750.00
C PERALATAN -
D JUMLAH A + B + C 18,065.00
E OVERHEAD & PROFIT (contoh 15%) 15% 2,709.75
F HARGA SATUAN PEKERJAAN (D+E) 20,774.75
2 A.4.7.1.2 1 m2 Pencucian Bidang Permukaan Tembok yang Pernah dicat
A TENAGA 12,315.00
L.01 0.150 OH Pekerja 80,000.00 12,000.00
L.04 0.003 OH Mandor 105,000.00 315.00
B BAHAN 6,500.00
0.050 Kg Sabun 130,000.00 6,500.00
C PERALATAN -
D JUMLAH A + B + C 18,815.00
E OVERHEAD & PROFIT (contoh 15%) 15% 2,822.25
F HARGA SATUAN PEKERJAAN (D+E) 21,637.25
3 A.4.7.1.3 1 m2 Pengerokan Karat Cat Lama permukaan Baja dg cara manual
A TENAGA 12,840.00
L.01 0.150 OH Pekerja 80,000.00 12,000.00
L.04 0.008 OH Mandor 105,000.00 840.00
B BAHAN 6,500.00
0.050 Kg Sabun 130,000.00 6,500.00
C PERALATAN -
D JUMLAH A + B + C 19,340.00
E OVERHEAD & PROFIT (contoh 15%) 15% 2,901.00

HALAMAN 188 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

F HARGA SATUAN PEKERJAAN (D+E) 22,241.00


4 A.4.7.1.4 1 m2 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penutup)
A TENAGA 7,445.00
L.01 0.070 OH Pekerja 80,000.00 5,600.00
L.02 0.009 OH Tukang Cat 100,000.00 900.00
L.03 0.006 OH Kepala Tukang 105,000.00 630.00
L.04 0.003 OH Mandor 105,000.00 315.00

HALAMAN 189 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

B BAHAN 33,230.00
0.200 kg Cat Menie 35,000.00 7,000.00
0.150 kg Plamuur 25,000.00 3,750.00
0.170 kg Cat Dasar 35,000.00 5,950.00
0.260 kg Cat Penutup 55,000.00 14,300.00
0.010 bh Kuas 63,000.00 630.00
0.030 kg Pengencer 20,000.00 600.00
0.200 lbr Amplas 5,000.00 1,000.00
C PERALATAN -
D JUMLAH A + B + C 40,675.00
E OVERHEAD & PROFIT (contoh 15%) 15% 6,101.25
F HARGA SATUAN PEKERJAAN (D+E) 46,776.25
5 A.4.7.1.5 1 m2 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 3 Lp Cat Penutup)
A TENAGA 16,835.00
L.01 0.070 OH Pekerja 80,000.00 5,600.00
L.02 0.105 OH Tukang Cat 100,000.00 10,500.00
L.03 0.004 OH Kepala Tukang 105,000.00 420.00
L.04 0.003 OH Mandor 105,000.00 315.00
B BAHAN 38,180.00
0.200 kg Cat Menie 35,000.00 7,000.00
0.150 kg Plamuur 25,000.00 3,750.00
0.170 kg Cat Dasar 35,000.00 5,950.00
0.350 kg Cat Penutup 55,000.00 19,250.00
0.010 bh Kuas 63,000.00 630.00
0.030 kg Pengencer 20,000.00 600.00
0.200 lbr Amplas 5,000.00 1,000.00
C PERALATAN -
D JUMLAH A + B + C 55,015.00
E OVERHEAD & PROFIT (contoh 15%) 15% 8,252.25
F HARGA SATUAN PEKERJAAN (D+E) 63,267.25
6 A.4.7.1.6 1 m2 Pelaburan Bidang Kayu dg Teak Oil
A TENAGA -
L.01 0.040 OH Pekerja -
L.02 0.063 OH Tukang Cat -
L.03 0.063 OH Kepala Tukang -
L.04 0.003 OH Mandor -
B BAHAN -
0.360 Ltr Teak Oil -
C PERALATAN -
D JUMLAH A + B + C -
E OVERHEAD & PROFIT (contoh 15%) 15% -
F HARGA SATUAN PEKERJAAN (D+E) -
7 A.4.7.1.7 1 m2 Pelaburan Bidang Kayu dg Politur
A TENAGA 11,195.00
L.01 0.040 OH Pekerja 80,000.00 3,200.00
L.02 0.060 OH Tukang Cat 100,000.00 6,000.00
L.03 0.016 OH Kepala Tukang 105,000.00 1,680.00
L.04 0.003 OH Mandor 105,000.00 315.00
B BAHAN 31,924.00

HALAMAN 190 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

0.150 Ltr Politur 42,000.00 6,300.00


0.372 Ltr Politur Jadi 42,000.00 15,624.00
2.000 Lbr Ampelas 5,000.00 10,000.00
C PERALATAN -
D JUMLAH A + B + C 43,119.00
E OVERHEAD & PROFIT (contoh 15%) 15% 6,467.85
F HARGA SATUAN PEKERJAAN (D+E) 49,586.85

HALAMAN 191 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

8 A.4.7.1.8 1 m2 Pelaburan Bidang Kayu dg Cat Residu & Ter


A TENAGA 8,630.00
L.01 0.100 OH Pekerja 80,000.00 8,000.00
L.04 0.006 OH Mandor 105,000.00 630.00
B BAHAN 1,260.00
0.350 Ltr Residu atau Ter 3,600.00 1,260.00
C PERALATAN -
D JUMLAH A + B + C 9,890.00
E OVERHEAD & PROFIT (contoh 15%) 15% 1,483.50
F HARGA SATUAN PEKERJAAN (D+E) 11,373.50
9 A.4.7.1.9 1 m2 Pelaburan Bidang Kayu dg Vernis
A TENAGA 30,795.00
L.01 0.160 OH Pekerja 80,000.00 12,800.00
L.02 0.160 OH Tukang Cat 100,000.00 16,000.00
L.03 0.016 OH Kepala Tukang 105,000.00 1,680.00
L.04 0.003 OH Mandor 105,000.00 315.00
B BAHAN 9,850.00
0.150 Ltr Vernis 54,000.00 8,100.00
0.050 Ltr Dempul 25,000.00 1,250.00
0.100 Lbr Ampelas 5,000.00 500.00
C PERALATAN -
D JUMLAH A + B + C 40,645.00
E OVERHEAD & PROFIT (contoh 15%) 15% 6,096.75
F HARGA SATUAN PEKERJAAN (D+E) 46,741.75
10 A.4.7.1.10 1 m2 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 Lap.Cat Penutup)
A TENAGA 8,876.50
L.01 0.020 OH Pekerja 80,000.00 1,600.00
L.02 0.063 OH Tukang Cat 100,000.00 6,300.00
L.03 0.006 OH Kepala Tukang 105,000.00 661.50
L.04 0.003 OH Mandor 105,000.00 315.00
B BAHAN 12,600.00
0.100 Kg Plamir 36,000.00 3,600.00
0.100 Kg Cat Dasar 25,000.00 2,500.00
0.260 Kg Cat Penutup 2 kali 25,000.00 6,500.00
C PERALATAN -
D JUMLAH A + B + C 21,476.50
E OVERHEAD & PROFIT (contoh 15%) 15% 3,221.48
F HARGA SATUAN PEKERJAAN (D+E) 24,697.98
11 A.4.7.1.11 1 m2 Pengecatan Tembok Lama (1lap.Plamir, 2lap Cat Penutup)
A TENAGA 7,196.00
L.01 0.028 OH Pekerja 80,000.00 2,240.00
L.02 0.042 OH Tukang Cat 100,000.00 4,200.00
L.03 0.004 OH Kepala Tukang 105,000.00 441.00
L.04 0.003 OH Mandor 105,000.00 315.00
B BAHAN 7,500.00
0.120 Kg Cat Dasar 25,000.00 3,000.00
0.180 Kg Cat Penutup 2 kali 25,000.00 4,500.00
C PERALATAN -
D JUMLAH A + B + C 14,696.00

HALAMAN 192 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

E OVERHEAD & PROFIT (contoh 15%) 15% 2,204.40


F HARGA SATUAN PEKERJAAN (D+E) 16,900.40
12 A.4.7.1.12 1 m2 Pengecatan Tembok dengan Kalkarium
A TENAGA 7,196.00
L.01 0.028 OH Pekerja 80,000.00 2,240.00
L.02 0.042 OH Tukang Cat 100,000.00 4,200.00
L.03 0.004 OH Kepala Tukang 105,000.00 441.00
L.04 0.003 OH Mandor 105,000.00 315.00

HALAMAN 193 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

B BAHAN 700.00
0.100 Kg Kalkarium 7,000.00 700.00
C PERALATAN -
D JUMLAH A + B + C 7,896.00
E OVERHEAD & PROFIT (contoh 15%) 15% 1,184.40
F HARGA SATUAN PEKERJAAN (D+E) 9,080.40
13 A.4.7.1.13 1 m2 Pelaburan Tembok dengan Kapur Sirih
A TENAGA -
L.01 0.150 OH Pekerja -
L.02 0.001 OH Tukang Cat -
L.03 0.000 OH Kepala Tukang -
L.04 0.003 OH Mandor -
B BAHAN -
0.150 Kg Kapur Sirih -
0.100 lbr Amplas -
0.250 ikat Alang-alang -
C PERALATAN -
D JUMLAH A + B + C -
E OVERHEAD & PROFIT (contoh 15%) 15% -
F HARGA SATUAN PEKERJAAN (D+E) -
14 A.4.7.1.14 1 m2 Pelaburan Tembok lama dengan Kapur Sirih (pemeliharaan)
A TENAGA -
L.01 0.040 OH Pekerja -
L.02 0.005 OH Tukang Cat -
L.03 0.001 OH Kepala Tukang -
L.04 0.003 OH Mandor -
B BAHAN -
0.300 Kg Kapur Sirih -
0.200 lbr Amplas -
0.250 ikat Alang-alang -
C PERALATAN -
D JUMLAH A + B + C -
E OVERHEAD & PROFIT (contoh 15%) 15% -
F HARGA SATUAN PEKERJAAN (D+E) -
15 A.4.7.1.15 1 m2 Pemasangan Wallpaper
A TENAGA 23,962.50
L.01 0.020 OH Pekerja 80,000.00 1,600.00
L.02 0.200 OH Tukang Cat 100,000.00 20,000.00
L.03 0.020 OH Kepala Tukang 105,000.00 2,100.00
L.04 0.003 OH Mandor 105,000.00 262.50
B BAHAN 288,000.00
1.200 lbr Wall Paper 235,000.00 282,000.00
0.200 kg Lem 30,000.00 6,000.00
C PERALATAN -
D JUMLAH A + B + C 311,962.50
E OVERHEAD & PROFIT (contoh 15%) 15% 46,794.38
F HARGA SATUAN PEKERJAAN (D+E) 358,756.88
16 A.4.7.1.16 1 m2 Pengecatan Permukaan Baja dg Meni Besi
A TENAGA 22,072.50

HALAMAN 194 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

L.01 0.020 OH Pekerja 80,000.00 1,600.00


L.02 0.200 OH Tukang Cat 100,000.00 20,000.00
L.03 0.002 OH Kepala Tukang 105,000.00 210.00
L.04 0.003 OH Mandor 105,000.00 262.50
B BAHAN 2,600.00
0.100 Kg Meni Besi 26,000.00 2,600.00
C PERALATAN -
D JUMLAH A + B + C 24,672.50
E OVERHEAD & PROFIT (contoh 15%) 15% 3,700.88
F HARGA SATUAN PEKERJAAN (D+E) 28,373.38

HALAMAN 195 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

17 A.4.7.1.17 1 m2 Pengecatan Permukaan Baja dg Meni Besi & Perancah


A TENAGA 43,287.50
L.01 0.250 OH Pekerja 80,000.00 20,000.00
L.02 0.225 OH Tukang Cat 100,000.00 22,500.00
L.04 0.008 OH Mandor 105,000.00 787.50
B BAHAN 6,800.00
0.100 Kg Meni Besi 26,000.00 2,600.00
0.002 m3 Perancah Kayu (kayu lokal) 2,100,000.00 4,200.00
C PERALATAN -
D JUMLAH A + B + C 50,087.50
E OVERHEAD & PROFIT (contoh 15%) 15% 7,513.13
F HARGA SATUAN PEKERJAAN (D+E) 57,600.63
XIV A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
1 A.5.1.1.1 1 Unit Pemasangan Closet Duduk / Mono Blok
A TENAGA 390,905.00
L.01 3.300 OH Pekerja 80,000.00 264,000.00
L.02 1.100 OH Tukang Batu 100,000.00 110,000.00
L.03 0.001 OH Kepala Tukang 105,000.00 105.00
L.04 0.160 OH Mandor 105,000.00 16,800.00
B BAHAN 1,537,000.00
1.000 Buah Kloset Duduk / Monoblok 1,450,000.00 1,450,000.00
0.060 Kelengkapan 6% dari harga Kloset 1,450,000.00 87,000.00
C PERALATAN -
D JUMLAH A + B + C 1,927,905.00
E OVERHEAD & PROFIT (contoh 15%) 15% 289,185.75
F HARGA SATUAN PEKERJAAN (D+E) 2,217,090.75
2 A.5.1.1.2 1 Unit Pemasangan Closet Jongkok Porselen
A TENAGA 404,300.00
L.01 1.000 OH Pekerja 80,000.00 80,000.00
L.02 1.500 OH Tukang Batu 100,000.00 150,000.00
L.03 1.500 OH Kepala Tukang 105,000.00 157,500.00
L.04 0.160 OH Mandor 105,000.00 16,800.00
B BAHAN 164,900.00
1.000 Buah Kloset Jongkok 155,000.00 155,000.00
6.000 Kg Portland Semen 1,120.00 6,720.00
0.010 m3 Pasir Pasang 318,000.00 3,180.00
C PERALATAN -
D JUMLAH A + B + C 569,200.00
E OVERHEAD & PROFIT (contoh 15%) 15% 85,380.00
F HARGA SATUAN PEKERJAAN (D+E) 654,580.00
3 A.5.1.1.4 1 Unit Pemasangan Urinoir
A TENAGA 201,000.00
L.01 1.000 OH Pekerja 80,000.00 80,000.00
L.02 1.000 OH Tukang Batu 100,000.00 100,000.00
L.03 0.100 OH Kepala Tukang 105,000.00 10,500.00
L.04 0.100 OH Mandor 105,000.00 10,500.00
B BAHAN #VALUE!
1.000 Buah Urinoir - #VALUE!
0.300 - Perlengkapan 30% Harga Urinoir #VALUE! #VALUE!

HALAMAN 196 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

6.000 Kg Portland Semen 1,120.00 6,720.00


0.010 m3 Pasir Pasang 318,000.00 3,180.00
C PERALATAN -
D JUMLAH A + B + C #VALUE!
E OVERHEAD & PROFIT (contoh 15%) 15% #VALUE!
F HARGA SATUAN PEKERJAAN (D+E) #VALUE!
4 A.5.1.1.5 1 Unit Pemasangan Wastafel
A TENAGA 136,750.00
L.01 1.200 OH Pekerja 80,000.00 96,000.00
L.02 0.145 OH Tukang Batu 100,000.00 14,500.00

HALAMAN 197 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

L.03 0.150 OH Kepala Tukang 105,000.00 15,750.00


L.04 0.100 OH Mandor 105,000.00 10,500.00
B BAHAN 594,900.00
1.000 Buah Wastafel 450,000.00 450,000.00
0.300 - Perlengkapan 30% Harga Wastafel 450,000.00 135,000.00
6.000 Kg Portland Semen 1,120.00 6,720.00
0.010 m3 Pasir Pasang 318,000.00 3,180.00
C PERALATAN -
D JUMLAH A + B + C 731,650.00
E OVERHEAD & PROFIT (contoh 15%) 15% 109,747.50
F HARGA SATUAN PEKERJAAN (D+E) 841,397.50
5 A.5.1.1.6 1 Unit Pemasangan Bathtube porselen
A TENAGA -
L.01 0.075 OH Pekerja -
L.02 0.750 OH Tukang Batu -
L.03 0.075 OH Kepala Tukang -
L.04 0.003 OH Mandor -
B BAHAN -
1.000 Buah Bathtube -
0.200 - Perlengkapan 20% Harga Bathcuip -
C PERALATAN -
D JUMLAH A + B + C -
E OVERHEAD & PROFIT (contoh 15%) 15% -
F HARGA SATUAN PEKERJAAN (D+E) -
6 A.5.1.1.7 1 Unit Pemasangan Bak Fibreglass vol.1 m3
A TENAGA 789,750.00
L.01 3.000 OH Pekerja 80,000.00 240,000.00
L.02 4.500 OH Tukang Batu 100,000.00 450,000.00
L.03 0.050 OH Kepala Tukang 105,000.00 5,250.00
L.04 0.900 OH Mandor 105,000.00 94,500.00
B BAHAN 201,600.00
1.000 Buah Bak Fibreglass 180,000.00 180,000.00
0.120 - Perlengkapan 12% Bak Fibreglass 180,000.00 21,600.00
C PERALATAN -
D JUMLAH A + B + C 991,350.00
E OVERHEAD & PROFIT (contoh 15%) 15% 148,702.50
F HARGA SATUAN PEKERJAAN (D+E) 1,140,052.50
7 A.5.1.1.8 1 Unit Memasang Bak Mandi Batu Bata Vol. 0,30 m3
A TENAGA -
L.01 6.000 OH Pekerja -
L.02 3.000 OH Tukang Batu -
L.03 0.300 OH Kepala Tukang -
L.04 0.030 OH Mandor -
B BAHAN -
150.000 bh Batu Bata -
120.000 Kg Portland Semen -
0.300 m3 Pasir Pasang -
360.000 buah Porselen 11 x 11 cm -
6.000 Kg Semen Nat -

HALAMAN 198 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

C PERALATAN -
D JUMLAH A + B + C -
E OVERHEAD & PROFIT (contoh 15%) 15% -
F HARGA SATUAN PEKERJAAN (D+E) -
8 A.5.1.1.11 1 Unit Pemasangan Bak Beton Bertulang Vol. 1 m3
A TENAGA -
L.01 3.500 OH Pekerja -
L.02 4.500 OH Tukang Batu -
L.03 0.050 OH Kepala Tukang -
L.04 0.018 OH Mandor -

HALAMAN 199 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

B BAHAN -
0.900 m3 Beton K.150 -
180.000 Kg Baja Tulangan -
8.000 m2 Kayu Bekisting -
500.000 buah Porselen 11 x 11 cm -
10.000 % Perlengkapan -
C PERALATAN -
D JUMLAH A + B + C -
E OVERHEAD & PROFIT (contoh 15%) 15% -
F HARGA SATUAN PEKERJAAN (D+E) -
9 A.5.1.1.12 1 buah Pemasangan Bak Cuci Piring Stainless stell
A TENAGA 37,125.00
L.01 0.030 OH Pekerja 80,000.00 2,400.00
L.02 0.300 OH Tukang Batu 100,000.00 30,000.00
L.03 0.030 OH Kepala Tukang 105,000.00 3,150.00
L.04 0.015 OH Mandor 105,000.00 1,575.00
B BAHAN 175,000.00
1.000 unit Bak Cuci Piring 150,000.00 150,000.00
1.000 bh Water drain 25,000.00 25,000.00
C PERALATAN -
D JUMLAH A + B + C 212,125.00
E OVERHEAD & PROFIT (contoh 15%) 15% 31,818.75
F HARGA SATUAN PEKERJAAN (D+E) 243,943.75
10 A.5.1.1.14 1 buah Pemasangan Floor Drain
A TENAGA 12,375.00
L.01 0.010 OH Pekerja 80,000.00 800.00
L.02 0.100 OH Tukang Batu 100,000.00 10,000.00
L.03 0.010 OH Kepala Tukang 105,000.00 1,050.00
L.04 0.005 OH Mandor 105,000.00 525.00
B BAHAN 25,000.00
1.000 bh Floor Drain 25,000.00 25,000.00
C PERALATAN -
D JUMLAH A + B + C 37,375.00
E OVERHEAD & PROFIT (contoh 15%) 15% 5,606.25
F HARGA SATUAN PEKERJAAN (D+E) 42,981.25
11 A.5.1.1.15 1 bh Pemasangan Bak Kontrol Pas.Batu Bata 30x30 tinggi 35 cm
A TENAGA 253,515.00
L.01 2.160 OH Pekerja 80,000.00 172,800.00
L.02 0.720 OH Tukang Batu 100,000.00 72,000.00
L.03 0.072 OH Kepala Tukang 105,000.00 7,560.00
L.04 0.011 OH Mandor 105,000.00 1,155.00
B BAHAN 177,290.00
40.000 bh Batu Bata 1,150.00 46,000.00
44.000 kg Semen Portland 1,120.00 49,280.00
0.070 m3 Pasir Pasang 318,000.00 22,260.00
0.060 m3 Pasir Beton 345,000.00 20,700.00
0.070 m3 Kerikil 295,000.00 20,650.00
1.600 kg Baja Tulangan 11,500.00 18,400.00
C PERALATAN -

HALAMAN 200 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

D JUMLAH A + B + C 430,805.00
E OVERHEAD & PROFIT (contoh 15%) 15% 64,620.75
F HARGA SATUAN PEKERJAAN (D+E) 495,425.75
12 A.5.1.1.16 1 bh Pemasangan Bak Kontrol Pas.Batu Bata 45 x 45 tinggi 50 cm
A TENAGA 373,835.00
L.01 3.200 OH Pekerja 80,000.00 256,000.00
L.02 1.150 OH Tukang Batu 100,000.00 115,000.00
L.03 0.011 OH Kepala Tukang 105,000.00 1,155.00
L.04 0.016 OH Mandor 105,000.00 1,680.00

HALAMAN 201 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

B BAHAN 263,430.00
70.000 bh Batu Bata 1,150.00 80,500.00
77.000 kg Semen Portland 1,120.00 86,240.00
0.130 m3 Pasir Pasang 318,000.00 41,340.00
0.090 m3 Pasir Beton 345,000.00 31,050.00
0.020 m3 Kerikil 295,000.00 5,900.00
1.600 kg Baja Tulangan 11,500.00 18,400.00
C PERALATAN -
D JUMLAH A + B + C 637,265.00
E OVERHEAD & PROFIT (contoh 15%) 15% 95,589.75
F HARGA SATUAN PEKERJAAN (D+E) 732,854.75
13 A.5.1.1.17 1 bh Pemasangan Bak Kontrol Pas.Batu Bata 60x60 tinggi 60 cm
A TENAGA 373,835.00
L.01 3.200 OH Pekerja 80,000.00 256,000.00
L.02 1.150 OH Tukang Batu 100,000.00 115,000.00
L.03 0.011 OH Kepala Tukang 105,000.00 1,155.00
L.04 0.016 OH Mandor 105,000.00 1,680.00
B BAHAN 424,817.00
123.000 bh Batu Bata 1,150.00 141,450.00
114.000 kg Semen Portland 1,120.00 127,680.00
0.184 m3 Pasir Pasang 318,000.00 58,512.00
0.120 m3 Pasir Beton 345,000.00 41,400.00
4.850 kg Baja Tulangan 11,500.00 55,775.00
C PERALATAN -
D JUMLAH A + B + C 798,652.00
E OVERHEAD & PROFIT (contoh 15%) 15% 119,797.80
F HARGA SATUAN PEKERJAAN (D+E) 918,449.80
14 A.5.1.1.18 1 m' Pemasangan Pipa Galvanis Ø ½"
A TENAGA 17,100.00
L.01 0.054 OH Pekerja 80,000.00 4,320.00
L.02 0.090 OH Tukang Batu 100,000.00 9,000.00
L.03 0.009 OH Kepala Tukang 105,000.00 945.00
L.04 0.027 OH Mandor 105,000.00 2,835.00
B BAHAN 98,010.00
1.200 m' Pipa Galvanis Ø ½" 60,500.00 72,600.00
0.350 Ls Perlengkapan 35% x pipa 72,600.00 25,410.00
C PERALATAN -
D JUMLAH A + B + C 115,110.00
E OVERHEAD & PROFIT (contoh 15%) 15% 17,266.50
F HARGA SATUAN PEKERJAAN (D+E) 132,376.50
15 A.5.1.1.19 1 bh Pemasangan Kran Ø ½"
A TENAGA 45,525.00
L.01 0.010 OH Pekerja 80,000.00 800.00
L.02 0.400 OH Tukang Batu 100,000.00 40,000.00
L.03 0.040 OH Kepala Tukang 105,000.00 4,200.00
L.04 0.005 OH Mandor 105,000.00 525.00
B BAHAN 22,017.50
1.000 bh Kran Air 22,000.00 22,000.00
0.003 bh Sealtape 7,000.00 17.50

HALAMAN 202 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

C PERALATAN -
D JUMLAH A + B + C 67,542.50
E OVERHEAD & PROFIT (contoh 15%) 15% 10,131.38
F HARGA SATUAN PEKERJAAN (D+E) 77,673.88
16 A.5.1.1.20 1 m' Pemasangan Pipa Galvanis Ø ¾"
A TENAGA 17,100.00
L.01 0.054 OH Pekerja 80,000.00 4,320.00
L.02 0.090 OH Tukang Batu 100,000.00 9,000.00
L.03 0.009 OH Kepala Tukang 105,000.00 945.00
L.04 0.027 OH Mandor 105,000.00 2,835.00

HALAMAN 203 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

B BAHAN 209,628.00
1.200 m' Pipa Galvanis Ø ¾" 129,400.00 155,280.00
0.350 Ls Perlengkapan 35% x pipa 155,280.00 54,348.00
C PERALATAN -
D JUMLAH A + B + C 226,728.00
E OVERHEAD & PROFIT (contoh 15%) 15% 34,009.20
F HARGA SATUAN PEKERJAAN (D+E) 260,737.20
17 A.5.1.1.21 1 m' Pemasangan Pipa Galvanis Ø 1"
A TENAGA 17,100.00
L.01 0.054 OH Pekerja 80,000.00 4,320.00
L.02 0.090 OH Tukang Batu 100,000.00 9,000.00
L.03 0.009 OH Kepala Tukang 105,000.00 945.00
L.04 0.027 OH Mandor 105,000.00 2,835.00
B BAHAN 343,116.00
1.200 m' Pipa Galvanis Ø 1" 211,800.00 254,160.00
0.350 Ls Perlengkapan 35% x pipa 254,160.00 88,956.00
C PERALATAN -
D JUMLAH A + B + C 360,216.00
E OVERHEAD & PROFIT (contoh 15%) 15% 54,032.40
F HARGA SATUAN PEKERJAAN (D+E) 414,248.40
18 A.5.1.1.22 1 m' Pemasangan Pipa Galvanis Ø 1½ "
A TENAGA 29,055.00
L.01 0.108 OH Pekerja 80,000.00 8,640.00
L.02 0.180 OH Tukang Batu 100,000.00 18,000.00
L.03 0.018 OH Kepala Tukang 105,000.00 1,890.00
L.04 0.005 OH Mandor 105,000.00 525.00
B BAHAN 257,256.00
1.200 m' Pipa Galvanis Ø 1½" 158,800.00 190,560.00
0.350 Ls Perlengkapan 35% x pipa 190,560.00 66,696.00
C PERALATAN -
D JUMLAH A + B + C 286,311.00
E OVERHEAD & PROFIT (contoh 15%) 15% 42,946.65
F HARGA SATUAN PEKERJAAN (D+E) 329,257.65
19 A.5.1.1.23 1 m' Pemasangan Pipa Galvanis Ø 3"
A TENAGA 36,450.00
L.01 0.135 OH Pekerja 80,000.00 10,800.00
L.02 0.225 OH Tukang Batu 100,000.00 22,500.00
L.03 0.023 OH Kepala Tukang 105,000.00 2,415.00
L.04 0.007 OH Mandor 105,000.00 735.00
B BAHAN 122,310.00
1.200 m' Pipa Galvanis Ø 3" 75,500.00 90,600.00
0.350 Ls Perlengkapan 35% x pipa 90,600.00 31,710.00
C PERALATAN -
D JUMLAH A + B + C 158,760.00
E OVERHEAD & PROFIT (contoh 15%) 15% 23,814.00
F HARGA SATUAN PEKERJAAN (D+E) 182,574.00
20 A.5.1.1.24 1 m' Pemasangan Pipa Galvanis Ø 4"
A TENAGA 36,450.00
L.01 0.135 OH Pekerja 80,000.00 10,800.00

HALAMAN 204 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

L.02 0.225 OH Tukang Batu 100,000.00 22,500.00


L.03 0.023 OH Kepala Tukang 105,000.00 2,415.00
L.04 0.007 OH Mandor 105,000.00 735.00
B BAHAN 220,482.00
1.200 m' Pipa Galvanis Ø 4" 136,100.00 163,320.00
0.350 Ls Perlengkapan 35% x pipa 163,320.00 57,162.00
C PERALATAN -
D JUMLAH A + B + C 256,932.00
E OVERHEAD & PROFIT (contoh 15%) 15% 38,539.80
F HARGA SATUAN PEKERJAAN (D+E) 295,471.80

HALAMAN 205 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

21 A.5.1.1.25 1 m' Pemasangan Pipa PVC tipe AW Ø ½"


A TENAGA 9,720.00
L.01 0.036 OH Pekerja 80,000.00 2,880.00
L.02 0.060 OH Tukang Batu 100,000.00 6,000.00
L.03 0.006 OH Kepala Tukang 105,000.00 630.00
L.04 0.002 OH Mandor 105,000.00 210.00
B BAHAN 10,125.00
1.200 m' Pipa PVC Ø ½" 6,250.00 7,500.00
0.350 Ls Perlengkapan 35% x pipa 7,500.00 2,625.00
C PERALATAN -
D JUMLAH A + B + C 19,845.00
E OVERHEAD & PROFIT (contoh 15%) 15% 2,976.75
F HARGA SATUAN PEKERJAAN (D+E) 22,821.75
22 A.5.1.1.26 1 m' Pemasangan Pipa PVC tipe AW Ø ¾"
A TENAGA 9,720.00
L.01 0.036 OH Pekerja 80,000.00 2,880.00
L.02 0.060 OH Tukang Batu 100,000.00 6,000.00
L.03 0.006 OH Kepala Tukang 105,000.00 630.00
L.04 0.002 OH Mandor 105,000.00 210.00
B BAHAN 13,770.00
1.200 m' Pipa PVC Ø ¾" 8,500.00 10,200.00
0.350 Ls Perlengkapan 35% x pipa 10,200.00 3,570.00
C PERALATAN -
D JUMLAH A + B + C 23,490.00
E OVERHEAD & PROFIT (contoh 15%) 15% 3,523.50
F HARGA SATUAN PEKERJAAN (D+E) 27,013.50
23 A.5.1.1.27 1 m' Pemasangan Pipa PVC tipe AW Ø 1"
A TENAGA 9,720.00
L.01 0.036 OH Pekerja 80,000.00 2,880.00
L.02 0.060 OH Tukang Batu 100,000.00 6,000.00
L.03 0.006 OH Kepala Tukang 105,000.00 630.00
L.04 0.002 OH Mandor 105,000.00 210.00
B BAHAN 18,022.50
1.200 m' Pipa PVC Ø 1" 11,125.00 13,350.00
0.350 Ls Perlengkapan 35% x pipa 13,350.00 4,672.50
C PERALATAN -
D JUMLAH A + B + C 27,742.50
E OVERHEAD & PROFIT (contoh 15%) 15% 4,161.38
F HARGA SATUAN PEKERJAAN (D+E) 31,903.88
24 A.5.1.1.28 1 m' Pemasangan Pipa PVC tipe AW Ø 1½"
A TENAGA 14,580.00
L.01 0.054 OH Pekerja 80,000.00 4,320.00
L.02 0.090 OH Tukang Batu 100,000.00 9,000.00
L.03 0.009 OH Kepala Tukang 105,000.00 945.00
L.04 0.003 OH Mandor 105,000.00 315.00
B BAHAN 22,275.00
1.200 m' Pipa PVC Ø 1½" 13,750.00 16,500.00
0.350 Ls Perlengkapan 35% x pipa 16,500.00 5,775.00
C PERALATAN -

HALAMAN 206 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

D JUMLAH A + B + C 36,855.00
E OVERHEAD & PROFIT (contoh 15%) 15% 5,528.25
F HARGA SATUAN PEKERJAAN (D+E) 42,383.25
25 A.5.1.1.29 1 m' Pemasangan Pipa PVC tipe AW Ø 2"
A TENAGA 14,580.00
L.01 0.054 OH Pekerja 80,000.00 4,320.00
L.02 0.090 OH Tukang Batu 100,000.00 9,000.00
L.03 0.009 OH Kepala Tukang 105,000.00 945.00
L.04 0.003 OH Mandor 105,000.00 315.00

HALAMAN 207 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

B BAHAN 31,995.00
1.200 m' Pipa PVC Ø 2" 19,750.00 23,700.00
0.350 Ls Perlengkapan 35% x pipa 23,700.00 8,295.00
C PERALATAN -
D JUMLAH A + B + C 46,575.00
E OVERHEAD & PROFIT (contoh 15%) 15% 6,986.25
F HARGA SATUAN PEKERJAAN (D+E) 53,561.25
26 A.5.1.1.31 1 m' Pemasangan Pipa PVC tipe AW Ø 3"
A TENAGA 21,817.50
L.01 0.081 OH Pekerja 80,000.00 6,480.00
L.02 0.135 OH Tukang Batu 100,000.00 13,500.00
L.03 0.014 OH Kepala Tukang 105,000.00 1,417.50
L.04 0.004 OH Mandor 105,000.00 420.00
B BAHAN 51,435.00
1.200 m' Pipa PVC Ø 3" 31,750.00 38,100.00
0.350 Ls Perlengkapan 35% x pipa 38,100.00 13,335.00
C PERALATAN -
D JUMLAH A + B + C 73,252.50
E OVERHEAD & PROFIT (contoh 15%) 15% 10,987.88
F HARGA SATUAN PEKERJAAN (D+E) 84,240.38
27 A.5.1.1.32 1 m' Pemasangan Pipa PVC tipe AW Ø 4"
A TENAGA 9,720.00
L.01 0.036 OH Pekerja 80,000.00 2,880.00
L.02 0.060 OH Tukang Batu 100,000.00 6,000.00
L.03 0.006 OH Kepala Tukang 105,000.00 630.00
L.04 0.002 OH Mandor 105,000.00 210.00
B BAHAN 69,660.00
1.200 m' Pipa PVC Ø 4" 43,000.00 51,600.00
0.350 Ls Perlengkapan 35% x pipa 51,600.00 18,060.00
C PERALATAN -
D JUMLAH A + B + C 79,380.00
E OVERHEAD & PROFIT (contoh 15%) 15% 11,907.00
F HARGA SATUAN PEKERJAAN (D+E) 91,287.00
28 A.5.1.1.33 1 m' Pemasangan Pipa Air Limbah Jenis Pipa Tanah Ø 20 cm
A TENAGA -
L.01 0.080 OH Pekerja -
L.02 0.040 OH Tukang Batu -
L.03 0.004 OH Kepala Tukang -
L.04 0.004 OH Mandor -
B BAHAN -
1.600 bh pipa tanah -
35.000 kg Semen Portlan -
0.014 m3 Pasir Pasang -
0.014 m3 Pasir Urug -
C PERALATAN -
D JUMLAH A + B + C -
E OVERHEAD & PROFIT (contoh 15%) 15% -
F HARGA SATUAN PEKERJAAN (D+E) -
29 A.5.1.1.34 1 m' Pemasangan Pipa Air Limbah Jenis Pipa Tanah Ø 15 cm

HALAMAN 208 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

A TENAGA -
L.01 0.060 OH Pekerja -
L.02 0.030 OH Tukang Batu -
L.03 0.003 OH Kepala Tukang -
L.04 0.003 OH Mandor -
B BAHAN -
1.600 bh pipa tanah -
6.800 kg Semen Portlan -
0.013 m3 Pasir Pasang -

HALAMAN 209 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

0.011 m3 Pasir Urug -


C PERALATAN -
D JUMLAH A + B + C -
E OVERHEAD & PROFIT (contoh 15%) 15% -
F HARGA SATUAN PEKERJAAN (D+E) -
30 A.5.1.1.35 1 m' Pemasangan Pipa Beton Ø 20 cm
A TENAGA 19,670.00
L.01 0.140 OH Pekerja 80,000.00 11,200.00
L.02 0.070 OH Tukang Batu 100,000.00 7,000.00
L.03 0.007 OH Kepala Tukang 105,000.00 735.00
L.04 0.007 OH Mandor 105,000.00 735.00
B BAHAN 116,213.90
1.100 bh pipa beton 60,000.00 66,000.00
20.250 bh Batu Bata (besar) 1,150.00 23,287.50
3.920 kg Semen Portlan 1,120.00 4,390.40
0.056 m3 Pasir Pasang 318,000.00 17,808.00
0.024 m3 Pasir Urug 197,000.00 4,728.00
C PERALATAN -
D JUMLAH A + B + C 135,883.90
E OVERHEAD & PROFIT (contoh 15%) 15% 20,382.59
F HARGA SATUAN PEKERJAAN (D+E) 156,266.49
31 A.5.1.1.36 1 m' Pemasangan Pipa Beton Ø 30 cm
A TENAGA 53,390.00
L.01 0.380 OH Pekerja 80,000.00 30,400.00
L.02 0.190 OH Tukang Batu 100,000.00 19,000.00
L.03 0.019 OH Kepala Tukang 105,000.00 1,995.00
L.04 0.019 OH Mandor 105,000.00 1,995.00
B BAHAN 179,964.50
1.100 bh pipa beton 80,000.00 88,000.00
41.250 bh Batu Bata (besar) 1,150.00 47,437.50
10.300 kg Semen Portlan 1,120.00 11,536.00
0.061 m3 Pasir Pasang 318,000.00 19,398.00
0.069 m3 Pasir Urug 197,000.00 13,593.00
C PERALATAN -
D JUMLAH A + B + C 233,354.50
E OVERHEAD & PROFIT (contoh 15%) 15% 35,003.17
F HARGA SATUAN PEKERJAAN (D+E) 268,357.68
XV A.8.4.6 HARGA SATUAN PEKERJAAN ELEKTRIKAL
1 A.8.4.6.1 1 Titik Pemasangan Lampu
A TENAGA -
100.000 % Pekerja -
B BAHAN -
3.000 btg Pipa Listrik 5/8" **) -
24.000 m Kabel **) -
3.000 buah T.Dus -
4.000 buah L.Bow -
3.000 buah Las Dop -
24.000 buah Klem -
1.000 buah Mongkok -

HALAMAN 210 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

1.000 buah Saklar -


1.000 buah Pitting -
C PERALATAN -
D JUMLAH A + B + C -
E OVERHEAD & PROFIT (contoh 15%) 15% -
F HARGA SATUAN PEKERJAAN (D+E) -

HALAMAN 211 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

2 A.8.4.6.2 1 buah Pemasangan MCB


A TENAGA -
L.01 100.000 % Pekerja -
B BAHAN -
3.000 Kg Pipa Listrik 5/8" **) -
15.000 m Kabel **) -
1.000 buah T.Dus -
2.000 buah L.Bow -
24.000 buah Klem -
1.000 buah MCB -
C PERALATAN -
D JUMLAH A + B + C -
E OVERHEAD & PROFIT (contoh 15%) 15% -
F HARGA SATUAN PEKERJAAN (D+E) -
K.618a 1 m2 Lapis Penetrasi Makadam 5 cm (Lapen) Menggunakan Buruh
A TENAGA 8,625.00
0.004 OH Mandor 105,000.00 450.00
0.004 OH Operator terlatih 105,000.00 450.00
0.141 OH Buruh tak terampil 50,000.00 7,071.43
0.004 OH Buruh terampil 100,000.00 428.57
0.002 OH Sopir 105,000.00 225.00
B BAHAN 81,092.52
0.038 m3 Batu pecah 3-5 cm 338,000.00 12,675.00
0.022 m3 Batu pecah 2-3 cm 295,000.00 6,447.86
0.008 m3 Batu pecah 1-2 cm 295,000.00 2,227.25
0.007 m3 Batu pecah 0,5 - 1 cm 282,000.00 1,841.06
0.001 m3 Abu batu 275,000.00 239.64
4.479 kg Aspal 12,320.00 55,176.00
0.010 m3 Kayu Bakar 220,000.00 2,200.00
0.006 set Alat bantu 50,000.00 285.71
C PERALATAN 2,678.12
0.011 jam Roller 3 Wheeld 6-8 T 55 HP 249,958.00 2,678.12
D JUMLAH A + B + C 92,395.64
E OVERHEAD & PROFIT (contoh 15%) 15% 13,859.35
F HARGA SATUAN PEKERJAAN (D+E) 106,254.99
K.637a 1 m3 Propelering Penetrasi Makadam (Menggunakan Buruh)
A TENAGA 172,500.00
0.086 OH Mandor 105,000.00 9,000.00
0.086 OH Operator terlatih 105,000.00 9,000.00
2.829 OH Buruh tak terampil 50,000.00 141,428.57
0.086 OH Buruh terampil 100,000.00 8,571.43
0.043 OH Sopir 105,000.00 4,500.00
B BAHAN 1,495,531.43
0.886 m3 Batu pecah 3-5 cm 338,000.00 299,371.43
0.237 m3 Batu pecah 2-3 cm 295,000.00 69,957.14
0.203 m3 Batu pecah 1-2 cm 295,000.00 59,842.86
0.159 m3 Batu pecah 0,5 - 1 cm 282,000.00 44,717.14
0.014 m3 Abu batu 275,000.00 3,928.57
78.571 kg Aspal 12,320.00 968,000.00

HALAMAN 212 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

0.200 m3 Kayu Bakar 220,000.00 44,000.00


0.114 set Alat bantu 50,000.00 5,714.29
C PERALATAN 53,562.43
0.214 jam Roller 3 Wheeld 6-8 T 55 HP 249,958.00 53,562.43
D JUMLAH A + B + C 1,721,593.86
E OVERHEAD & PROFIT (contoh 15%) 15% 258,239.08
F HARGA SATUAN PEKERJAAN (D+E) 1,979,832.94

HALAMAN 213 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

K.516 1 m3 Konstruksi Lapis Pondasi Bawah (LPB) Menggunakan Buruh


A TENAGA 67,125.00
0.038 OH Mandor 105,000.00 3,937.50
0.013 OH Operator terlatih 105,000.00 1,312.50
1.238 OH Buruh tak terampil 50,000.00 61,875.00
B BAHAN 354,875.00
0.625 m3 Batu belah uk. 15 - 20 cm 332,800.00 208,000.00
0.250 m3 Batu pecah tangan uk. 5 - 7 cm 282,000.00 70,500.00
0.375 m3 Pasir urug 197,000.00 73,875.00
0.050 set Alat bantu 50,000.00 2,500.00
C PERALATAN 15,622.38
0.063 jam Roller 3 Wheeld 6-8 T 55 HP 249,958.00 15,622.38
D JUMLAH A + B + C 437,622.38
E OVERHEAD & PROFIT (contoh 15%) 15% 65,643.36
F HARGA SATUAN PEKERJAAN (D+E) 503,265.73
K.621b 1 m2 Membuat Campuran, Menghampar dan Pemadatan Latasir 2 cm
A TENAGA 5,525.00
0.0025 OH Mandor 105,000.00 262.50
0.003 OH Operator terlatih 105,000.00 262.50
0.063 OH Buruh tak terlatih 50,000.00 3,125.00
0.025 OH Buruh semi terlatih 75,000.00 1,875.00
B BAHAN 59,077.35
3.429 m3 Aspal untuk campuran (aspal drum) 12,320.00 42,239.12
0.017 m3 Batu pecah mesin 0.5 282,000.00 4,836.30
0.004 m3 Abu batu (filler) 275,000.00 1,079.38
0.251 m3 Aspal untuk prime coat (aspal drum) 12,320.00 3,097.56
0.035 m3 Kayu bakar 220,000.00 7,700.00
0.003 set Alat bantu 50,000.00 125.00
C PERALATAN 3,124.48
0.013 jam Roller 3 Wheeld 6-8 T 55 HP 249,958.00 3,124.48
- jam Aspal Sprayer Towed 350 L 7 HP
D JUMLAH A + B + C 67,726.83
E OVERHEAD & PROFIT (contoh 15%) 15% 10,159.02
F HARGA SATUAN PEKERJAAN (D+E) 77,885.85
K.210 1 m2 Pengupasan Tanah dan Pembersihan Semak pada Damija
A TENAGA 2,116.67
0.001 OH Mandor 105,000.00 116.67
0.040 OH Buruh tak terlatih 50,000.00 2,000.00
B BAHAN -
C PERALATAN 83.33
0.002 set Alat bantu 50,000.00 83.33
D JUMLAH A + B + C 2,200.00
E OVERHEAD & PROFIT (contoh 15%) 15% 330.00
F HARGA SATUAN PEKERJAAN (D+E) 2,530.00
K.T04 1 m2 Pelapisan Prime Coat (menggunakan buruh)
A TENAGA 762.50
0.001 OH Mandor 105,000.00 131.25
0.001 OH Operator 105,000.00 131.25
0.005 OH Buruh semi terlatih 75,000.00 375.00

HALAMAN 214 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

0.003 OH Buruh tak terlatih 50,000.00 125.00


B BAHAN 13,528.50
0.800 Kg Aspal curah 11,220.00 8,976.00
0.400 Lt Minyak aspal (Kerosen / Minyak Tanah) 9,650.00 3,860.00
0.003 m3 Kayu Bakar 220,000.00 687.50
0.003 Set Alat bantu 2,000.00 5.00

HALAMAN 215 DARI 229 HALAMAN


HARGA
No. SNI KODE KOEFISIEN SAT. URAIAN BAHAN/UPAH JUMLAH (Rp)
(Rp)

C PERALATAN -
0.006 jam Asphal spreyer -
D JUMLAH A + B + C 14,291.00
E OVERHEAD & PROFIT (contoh 15%) 15% 2,143.65
F HARGA SATUAN PEKERJAAN (D+E) 16,434.65

Slawi, Desember 2019


Kepala Dinas Perumahan Rakyat, Kawasan Permukiman,
Tata Ruang dan Pertanahan Kabupaten Tegal

JAENAL DASMIN, BE, S.Sos, MM


NIP. 196510151989031008

HALAMAN 216 DARI 229 HALAMAN


DAFTAR HARGA SATUAN PEKERJAAN

KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN : 2019

KODE
No. URAIAN PEKERJAAN SAT. JUMLAH (Rp)
ANALISA

I A. 2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


1 A.2.2.1.2 Pagar Sementara dari Seng Gelombang Tinggi 2,00 m m' 364,136.00
2 A.2.2.1.4 Pengukuran dan Pemasangan Bouwplank m' 190,894.25
3 A.2.2.1.5 Pembuatan Kantor Sementara dg Lantai Plesteran m2 1,354,125.00
4 A.2.2.1.6 Pembuatan Rumah Jaga (Konstruksi Kayu) m2 901,370.00
5 A.2.2.1.7 Pembuatan Gudang Semen dan Peralatan m2 1,043,406.50
6 A.2.2.1.8 Pembuatan Bedeng Pekerja m2 1,107,059.00
7 A.2.2.1.9 Membersihkan Lapangan dan Perataan m2 15,237.50
8 A.2.2.1.10 Pembuatan Steger/Perancah dari Bambu m2 378,680.63
9 A.2.2.1.11 Pembuatan Kotak Adukan ukuran 40cmx50cmx25cm bh 187,024.50
10 A.2.2.1.12 Pembuatan Jalan Sementara m2 197,449.25
11 A.2.2.1.13 Bongkaran Beton Bertulang m3 1,307,147.50
12 A.2.2.1.14 Bongkaran Dinding Tembok Bata Merah m3 617,348.75
13 A.2.2.1.15 Pagar Kawat Jaring Galvanis Panjang 240 cm m2 55,811.80
14 A.2.2.1.16 Pemasangan Pagar Panel Beton Pracetak 5 x 50 x 240 cm m2 467,072.50
15 A.2.2.1.17 Bongkaran Pasangan batu kali m3 294,112.50
16 A.2.2.1.18 Bongkaran / Kupasan Plesteran m2 7,618.75
17 A.2.2.1.19 Bongkaran Lantai m2 5,807.50
18 A.2.2.1.20 Bongkaran Atap m2 3,047.50
19 A.2.2.1.21 Bongkaran Rangka Atap (Reng, Usuk) m2 14,705.63
20 A.2.2.1.22 Bongkaran Kusen Pintu dan Jendela m3 104,405.63
II A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
1 A.2.3.1.1 Menggali Tanah Biasa Sedalam 1 m m3 72,018.75
2 A.2.3.1.2 Menggali Tanah Biasa Sedalam 2 m m3 88,233.75
3 A.2.3.1.3 Menggali Tanah Biasa Sedalam 3 m m3 104,690.25
4 A.2.3.1.4 Menggali Tanah Keras Sedalam 1 m m3 95,864.00
5 A.2.3.1.5 Menggali Tanah Cadas Sedalam 1 m m3 145,245.00
6 A.2.3.1.6 Menggali Tanah Lumpur Sedalam 1 m m3 115,833.75
7 A.2.3.1.7 Mengerjakan Striping Tebing Setinggi 1 m m2 5,203.75
8 A.2.3.1.8 MembuangTanah sejauh 30 m' m3 31,567.50
9 A.2.3.1.9 Pengurugan Kembali m3 52,037.50
10 A.2.3.1.9a Pengurugan Kembali m3 52,037.50
di hitung dari 1/3 kali koefisien Pekerjaan galian
11 A.2.3.1.10 Pemadatan Tanah (per 20 cm) m3 52,037.50
12 A.2.3.1.11 Urugan Pasir m3 300,667.50
13 A.2.3.1.11a Urugan Tanah Dipadatkan Menggunakan Alat m3 146,549.11
14 A.2.3.1.12 Lapisan Pudel Cmp. 1Kp : 3Ps : 7TL m3 351,773.50
15 A.2.3.1.13 Pemasangan Lapisan Ijuk tebal 10 cm untuk Bidang Resapan m2 84,611.25
16 A.2.3.1.14 Mengurug Sirtu m3 257,168.75
17 A.2.3.1.14a Mengurug Sirtu Dipadatkan m3 264,510.36
III A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI

HALAMAN 217 DARI 229 HALAMAN


KODE
No. URAIAN PEKERJAAN SAT. JUMLAH (Rp)
ANALISA

1 A.3.2.1.1 Pemasangan Pondasi Batu Belah 1SP : 3 PP m3 1,139,167.00


2 A.3.2.1.1a Pemasangan Pondasi Batu Belah 1SP : 3 PP (Batu belah 60%,Blonos 40%) m3 1,115,983.00
3 A.3.2.1.2 Pemasangan Pondasi Batu Belah 1SP : 4 PP m3 1,101,734.50
4 A.3.2.1.2a Pemasangan Pondasi Batu Belah 1SP : 3 PP (Batu belah 60%,Blonos 40%) m3 1,078,550.50
5 A.3.2.1.3 Pemasangan Pondasi Batu Belah 1SP : 5 PP m3 1,075,735.30
6 A.3.2.1.3a Pemasangan Pondasi Batu Belah 1SP : 5 PP (Batu belah 60%,Blonos 40%) m3 1,052,551.30
7 A.3.2.1.4 Pemasangan Pondasi Batu Belah 1SP : 6 PP m3 1,057,480.20
8 A.3.2.1.4a Pemasangan Pondasi Batu Belah 1SP : 6 PP (Batu belah 60%,Blonos 40%) m3 1,034,296.20
9 A.3.2.1.5 Pemasangan Pondasi Batu Belah 1SP : 8 PP m3 1,032,403.30
10 A.3.2.1.5a Pemasangan Pondasi Batu Belah 1SP : 8 PP (Batu belah 60%,Blonos 40%) m3 1,009,219.30
11 A.3.2.1.6 Pemasangan Pondasi Batu Belah 1SP : 1KP : 2PP m3 865,283.46

HALAMAN 218 DARI 229 HALAMAN


KODE
No. URAIAN PEKERJAAN SAT. JUMLAH (Rp)
ANALISA

12 A.3.2.1.7 Pemasangan Pondasi Batu Belah, 1 SP : 3 KP : 10 PP m3 993,928.90


13 A.3.2.1.8 Pemasangan Pondasi Batu Belah, ¼ SP : 1KP : 4 PP m3 975,825.60
14 A.3.2.1.9 Pemasang Batu Kosong/Anstamping m3 683,162.10
15 A.3.2.1.10 Pasang Pondasi Siklop, 60% Beton Campuran 1PC : 2PB : 3KR & 40% Batu Belah m3 2,862,808.85
16 A.3.2.1.11 Pasang Pondasi Sumuran diameter 100 cm m3 974,205.25
17 A.3.2.1.12 Pemasangan Kembali Pondasi Batu Belah (bekas bongkaran) 1SP : 5 PP m3 846,103.30
18 A.3.2.1.13 Pemasangan Bronjong Kawat pabrikasi m3 874,218.50
IV A.4.1.1 HARGA SATUAN PEKERJAAN BETON
1 A.4.1.1.1 Membuat Beton mutu f'c=7,4 Mpa (K100), slum (12±2)cm, w/c = 0,87 m3 13,732,072.38
2 A.4.1.1.2 Membuat Beton mutu f'c=9,8 Mpa (K125), slum (12±2)cm, w/c = 0,78 m3 13,754,603.75
3 A.4.1.1.3 Membuat Beton mutu f'c=12,2 Mpa (K150), slum (12±2)cm, w/c = 0,72 m3 13,771,965.88
4 A.4.1.1.4 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87 m3 12,811,163.88
5 A.4.1.1.5 Membuat Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66 m3 13,792,489.06
6 A.4.1.1.6 Membuat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm, w/c = 0,61 m3 13,812,443.00
7 A.4.1.1.7 Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 m3 13,827,334.06
8 A.4.1.1.8 Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 m3 13,837,709.94
9 A.4.1.1.9 Membuat Lantai Kerja Beton mutu f'c=24,0 MPa(K275),slum(12±2)cm,w/c=0,53 m3 13,856,565.63
10 A.4.1.1.10 Membuat Beton mutu f'c=26,4 MPa (K300), slum (12±2)cm, w/c = 0,52 m3 13,861,973.50
11 A.4.1.1.11 Membuat Beton mutu f'c=28,8 MPa (K325), slum (12±2)cm, w/c = 0,49 m3 13,937,172.00
12 A.4.1.1.12 Membuat Beton mutu f'c=31,2 MPa (K350), slum (12±2)cm, w/c = 0,48 m3 13,944,731.81
13 A.4.1.1.17 Pembesian dg Besi Polos atau Besi Ulir Kg 158,130.75
14 A.4.1.1.18 Kabel Presstresed Polos/strand Kg 140,403.50
15 A.4.1.1.19 Jaring Kawat baja/Wire Mesh Kg 11,267,487.25
16 A.4.1.1.20 Memasang Bekisting untuk Pondasi m2 221,214.00
17 A.4.1.1.20a Memasang Bekisting untuk Pondasi (papan kayu lokal) m2 159,114.00
18 A.4.1.1.21 Memasang Bekisting untuk Sloof m2 237,314.00
19 A.4.1.1.21a Memasang Bekisting untuk Sloof (2x pakai) m2 164,289.00
20 A.4.1.1.22 Memasang Bekisting untuk Kolom m2 392,587.00
21 A.4.1.1.22a Memasang Bekisting untuk Kolom m2 247,399.50
22 A.4.1.1.22b Memasang Bekisting untuk Kolom (2x pakai) m2 181,849.50
23 A.4.1.1.22c Memasang Bekisting untuk Kolom (ekspose) 2x pakai m2 255,593.25
24 A.4.1.1.23 Memasang Bekisting untuk Balok m2 399,832.00
25 A.4.1.1.23a Memasang Bekisting untuk Balok m2 247,399.50
26 A.4.1.1.23b Memasang Bekisting untuk Balok (2x pakai) m2 181,849.50
27 A.4.1.1.23c Memasang Bekisting untuk Balok (ekspose) 2x pakai m2 259,215.75
28 A.4.1.1.24 Memasang Bekisting untuk Lantai m2 493,787.00
29 A.4.1.1.24a Memasang Bekisting untuk Lantai (papan kayu lokal) m2 364,987.00
30 A.4.1.1.25 Memasang Bekisting untuk Dinding m2 360,387.00
31 A.4.1.1.26 Memasang Bekisting untuk Tangga m2 313,237.00
32 A.4.1.1.27 Memasang Jembatan Cor m2 133,267.75
33 A.4.1.1.28 Membuat Ring Balok Beton Bertulang (11 x 11) cm m' 89,458.50
34 A.4.1.1.29 Membuat Ring Balok Beton Bertulang (10 x 15) cm m' 111,716.75
IV A A.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK
1 A.4.1.2.1 Pembuatan Lahan Produksi Tebal 8 cm Beton f'c 14,5 Mpa, Slump (120 ± 20) mm K3 m2 1,103,413.62
2 A.4.1.2.2 Pembuatan Lahan Produksi Tebal 10 cm Beton f'c = 14,5 Mpa slum (120 ± 20 ) mm K3 m2 1,379,294.33
Pembuatan Lahan Produksi Tebal 12 cm Beton f'c=14,5 Mpa, slum (120±20)mm,
3 A.4.1.2.3 m2 1,652,024.05
K3
Pembuatan Lahan Produksi Tebal 15 cm Beton f'c=14,5 Mpa, slum (120±20)mm,
4 A.4.1.2.4 m2 2,068,932.87
K3
5 A.4.1.2.5 Pembuatan Bekisting untuk Plat Beton Pra cetak (5 kali Pakai) m2 361,785.03
6 A.4.1.2.6 Pembuatan Bekisting untuk Balok Beton Pra cetak (10 - 12 kali Pakai) m2 48,248.25

HALAMAN 219 DARI 229 HALAMAN


KODE
No. URAIAN PEKERJAAN SAT. JUMLAH (Rp)
ANALISA

7 A.4.1.2.7 Pembuatan Bekisting untuk Kolom Beton Pra cetak (10 - 12 kali Pakai) m2 43,970.25
8 A.4.1.2.8 Pemasangan dan Membuka Bekisting untuk Komponen Plat Beton Pracetak bh 7,549.75
9 A.4.1.2.9 Pemasangan dan Membuka Bekisting untuk Komponen Balok Beton Pracetak bh 12,241.75
10 A.4.1.2.10 Pemasangan dan Membuka Bekisting untuk Komponen Kolom Beton Pracetak bh 9,895.75
11 A.4.1.2.11 Penuangan / Menebar Beton untuk Komponen Plat Pracetak m3 61,588.25
12 A.4.1.2.12 Penuangan / Menebar Beton untuk Komponen Plat Pracetak m3 63,330.50
13 A.4.1.2.13 Penuangan / Menebar Beton untuk Komponen Kolom Pracetak m3 56,936.50
14 A.4.1.2.14 Ereksi Komponen Untuk Plat Pracetak bh 325,694.62
15 A.4.1.2.15 Ereksi Komponen Untuk Balok Pracetak bh 320,347.12
16 A.4.1.2.16 Ereksi Komponen Untuk Kolom Pracetak bh 504,861.58

HALAMAN 220 DARI 229 HALAMAN


KODE
No. URAIAN PEKERJAAN SAT. JUMLAH (Rp)
ANALISA

17 A.4.1.2.17 Langsiran Komponen untuk Plat Pracetak (± 20 m) bh 132,634.84


18 A.4.1.2.18 Langsiran Komponen untuk Balok Pracetak (± 20 m) bh 107,955.84
19 A.4.1.2.19 Langsiran Komponen untuk Kolom Pracetak (± 20 m) bh 107,955.84
20 A.4.1.2.20 Bahan Grout Campuran m3 25,804,993.75
21 A.4.1.2.21 BAHAN Grout Campuran (tidak Campuran) m3 31,350,437.50
22 A.4.1.2.22 Upah Pekerjaan Gruot pada Joint Beton Pra Cetak ttk 55,608.25
23 A.4.1.2.23 Pemasangan Bekisting Joint Pra Cetak ttk 81,079.60
24 A.4.1.2.24 Upah Pemasangan Joint dengan Sling ttk 49,398.25
V A.4.2.1 HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM
1 A.4.2.1.1 Pemasangan Besi Profil Kg 33,344.25
2 A.4.2.1.2 Pemasangan Rangka Kuda-kuda Baja IWF Kg 33,344.25
3 A.4.2.1.3 Pengerjaan Pekerjaan Perakitan (Kuda-kuda Baja) kg 36,949.50
4 A.4.2.1.4 Pembuatan Pintu Besi Plat Baja tebal 2 mm rangkap, rangka baja Siku m2 1,064,307.75
5 A.4.2.1.5 Pengerjaan Pengelasan dengan Las Listrik cm 16,341.62
6 A.4.2.1.6 Pembuatan Rangka Jendela Besi Scuare Tube m2 1,214,581.08
7 A.4.2.1.7 Pemasangan Pintu Rolling Door Besi m2 637,364.50
8 A.4.2.1.8 Pemasangan Pintu Lipat (Folding Door) m2 145,049.50
9 A.4.2.1.9 Pemasangan Sunscreen Allumunium m2 144,003.00
10 A.4.2.1.10 Pemasangan Rolling Door Allumunium m2 656,362.50
11 A.4.2.1.11 Pemasangan Kusen Pintu Allumunium m' 137,726.30
12 A.4.2.1.12 Pemasangan Pintu Allumunium Strip Lebar 8 cm m2 977,538.53
13 A.4.2.1.13 Pemasangan Pintu Kaca Rangka Allumunium m2 569,963.00
14 A.4.2.1.14 Pemasangan Venetions Blinds & Vertical Blinds m2 136,349.75
15 A.4.2.1.15 Pemasangan Teralis Besi Strip (2x3) cm m2 533,321.83
16 A.4.2.1.16 Pemasangan Kawat Nyamuk m2 85,641.12
17 A.4.2.1.17 Pemasangan Jendela Nako & Tralis m2 149,275.75
18 A.4.2.1.18 Pemasangan Talang Datar / Jurai , Seng BJLS 20 Lebar 90 cm m' 208,564.00
19 A.4.2.1.19 Pemasangan Talang 1/2 Lingkaran Ø 15 cm, Seng Plaat BJLS 30 Lebar 45 cm m' 119,214.75
20 A.4.2.1.19a Pemasangan Talang 1/2 Lingkaran Ø 15 cm, Seng Plaat BJLS 30 Lebar 90 cm m' 194,493.75
21 A.4.2.1.20 Pemasangan Rangka Besi Hollow 1 x 40.40.2mm; Modul 60x120 cm dinding partisi m2 309,913.50
22 A.4.2.1.21 Pemasangan Rangka Besi Hollow 1 x 36.36.0,3 mm; Modul 60x60 cm dinding plafond m2 272,049.75
23 A.4.2.1.22 Pemasangan Atap Pelana Rangka Atap Baja Canal C dingin Profil C75 m2 218,091.75
24 A.4.2.1.23 Pemasangan Atap Jurai Rangka Atap Baja Canal Dingin Profil C75 m2 248,017.05
VI A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING
1 A.4.4.1.1 Pemasangan Dinding Bata Merah ukuran (5x11x22) cm Tebal 1 bata Camp. 1SP: 2PP m2 354,671.50
2 A.4.4.1.2 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 3PP m2 345,105.80
3 A.4.4.1.3 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 4PP m2 337,594.00
4 A.4.4.1.4 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 5PP m2 335,282.50
5 A.4.4.1.5 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 6PP m2 337,830.90
6 A.4.4.1.6 Pemasangan Dinding Bata Merah Uk.(5x11x22) cm Tebal 1 Bata Camp. 1SP:3KP:10PP m2 322,522.79
7 A.4.4.1.7 Pemasangan Dinding Bata Merah Uk. (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 2PP m2 172,997.95
8 A.4.4.1.8 Pemasangan Dinding Bata Merah Uk. (5x11x22)cm Tebal 1/2 Bata Camp. 1SP:3PP m2 167,830.31
9 A.4.4.1.9 Pemasangan Dinding Bata Merah Uk.(5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 4PP m2 165,230.85
10 A.4.4.1.10 Pemasangan Dinding Bata Merah Uk. (5x11x22)cm Tebal 1/2 Bata Camp. 1SP:5PP m2 163,618.09
11 A.4.4.1.11 Pemasangan Dinding Bata Merah Uk.(5x11x22)cm Tebal 1/2 Bata Camp. 1SP:6PP m2 163,329.21
12 A.4.4.1.12 Pemasangan Dinding Bata Merah Uk. (5x11x22)cm Tebal 1/2 Bata Camp. 1SP:8PP m2 161,350.75
13 A.4.4.1.13 Pemasangan Dinding Bata Merah Uk.(5x11x22)cm Tbl 1/2 Bata Camp.1SP:3KP:10PP m2 162,224.75
14 A.4.4.1.14 Pemasangan Dinding Bata Merah Uk.(5x11x22)cm Tebal 1/2 Bata Camp.1SP:1KP:1PP m2 145,439.53
15 A.4.4.1.15 Pemasangan Dinding Bata Merah Uk.(5x11x22)cm Tbl 1/2 Bata Camp.1SM:1KP:2PP m2 148,171.38

HALAMAN 221 DARI 229 HALAMAN


KODE
No. URAIAN PEKERJAAN SAT. JUMLAH (Rp)
ANALISA

16 A.4.4.1.16 Pemasangan Dinding HB/CB 20, speci camp. 1SP : 3PP m2 392,607.01
17 A.4.4.1.17 Pemasangan Dinding HB/CB 20, speci camp. 1SP : 4PP m2 400,892.53
18 A.4.4.1.18 Pemasangan Dinding HB/CB 15, speci camp. 1SP : 3PP m2 306,623.12
19 A.4.4.1.19 Pemasangan Dinding HB/CB 15, speci camp. 1SP : 4PP m2 312,478.00
20 A.4.4.1.20 Pemasangan Dinding HB/CB 10, speci camp. 1SP : 3PP m2 221,750.13
21 A.4.4.1.21 Pemasangan Dinding HB/CB 10, speci camp. 1SP : 4PP m2 226,624.29
22 A.4.4.1.22 Pemasangan Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1SP : 3PP m2 310,586.25
23 A.4.4.1.23 Pemasangan Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1SP : 4PP m2 310,586.25
24 A.4.4.1.24 Pemasangan Dinding Bata Berongga Ekspose Uk, (12x11x24)cm Camp. 1SP : 3PP m2 164,428.15
25 A.4.4.1.25 Pemasangan Dinding Bata Ringan Tebal 7,5 cm dengan Mortar Siap Pakai m2 279,671.81

HALAMAN 222 DARI 229 HALAMAN


KODE
No. URAIAN PEKERJAAN SAT. JUMLAH (Rp)
ANALISA

26 A.4.4.1.26 Pemasangan Dinding Bata Ringan Tebal 10 cm dengan Mortar Siap Pakai m2 300,660.05
VII A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN
1 A.4.4.2.1 Pemasangan Plesteran 1 Pc : 1 Pp Tebal 15 mm m2 74,292.85
2 A.4.4.2.2 Pemasangan Plesteran 1 Pc : 2 Pp Tebal 15 mm m2 68,955.01
3 A.4.4.2.3 Pemasangan Plesteran 1 Pc : 3 Pp Tebal 15 mm m2 66,899.09
4 A.4.4.2.4 Pemasangan Plesteran 1 Pc : 4 Pp Tebal 15 mm m2 65,286.42
5 A.4.4.2.5 Pemasangan Plesteran 1 Pc : 5 Pp Tebal 15 mm m2 64,657.69
6 A.4.4.2.6 Pemasangan Plesteran 1 Pc : 6 Pp Tebal 15 mm m2 64,034.21
7 A.4.4.2.7 Pemasangan Plesteran 1 Pc : 7 Pp Tebal 15 mm m2 63,781.67
8 A.4.4.2.8 Pemasangan Plesteran 1 Pc : 8 Pp Tebal 15 mm m2 63,529.13
9 A.4.4.2.9 Pemasangan Plesteran 1 Pc :1/2 Kp:3 Pp Tebal 15 mm m2 63,405.48
10 A.4.4.2.10 Pemasangan Plesteran 1 Pc : 2 Kp : 8 Pp Tebal 15 mm m2 62,870.50
11 A.4.4.2.11 Pemasangan Plesteran 1 SM : 1 Kp : 1 Pp Tebal 15 mm m2 57,715.05
12 A.4.4.2.12 Pemasangan Plesteran 1 SM : 1 Kp : 2 Pp Tebal 15 mm m2 59,046.75
13 A.4.4.2.13 Pemasangan Plesteran 1 Pc : 2 Pp Tebal 20 mm m2 92,303.42
14 A.4.4.2.14 Pemasangan Plesteran 1Pc : 3Pp Tebal 20 mm m2 75,595.43
15 A.4.4.2.15 Pemasangan Plesteran 1 Pc : 4 Pp Tebal 20 mm m2 87,290.06
16 A.4.4.2.16 Pemasangan Plesteran 1Pc : 5Pp Tebal 20 mm m2 86,573.66
17 A.4.4.2.17 Pemasangan Plesteran 1Pc : 6Pp Tebal 20 mm m2 85,620.44
18 A.4.4.2.18 Pemasangan Plesteran 1 SM : 2 Kp : 2 Pp Tebal 20 mm m2 81,556.85
19 A.4.4.2.19 Pemasangan Berapen 1 Pc : 5Pp Tebal 15 mm m2 40,542.19
20 A.4.4.2.20 Pemasangan Plesteran Skoning 1 Pc : 2Pp, lebar 10 mm m' 64,071.10
21 A.4.4.2.21 Pemasangan Plesteran Granit 1Pc : 2 Granit , Tebal 10 mm m' -
22 A.4.4.2.22 Pemasangan Plesteran Traso 1Pc : 2Traso, lebar 10 mm m' -
23 A.4.4.2.23 Pemasangan Plesteran Ciprat 1Pc : 2 Pp m2 49,877.11
24 A.4.4.2.24 Pemasangan Finishing Siar Pasangan Dinding Bata Merah m2 28,360.10
25 A.4.4.2.25 Pemasangan Finishing Siar Pasangan Dinding Conblock ekspose m2 13,491.80
26 A.4.4.2.26 Pemasangan Finishing Siar Pas.Batu Kali Adukan 1Pc : 2Pp m2 61,026.82
27 A.4.4.2.27 Pemasangan Acian m2 36,501.00
28 A.4.4.2.28 Pemasangan Plesteran dg Mortar Siap Pakai (MSP) m2 40,480.92
29 A.4.4.2.29 Pemasangan Acian dg Mortar Siap Pakai (MSP) m2 46,330.63
VIII A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan DINDING
1 A.4.4.3.2 Pemasangan lantai Ubin PC Abu-abu Uk. 30 x 30 cm m2 120,730.14
2 A.4.4.3.3 Pemasangan lantai Ubin PC Abu-abu Uk. 20 x 20 cm m2 178,874.97
3 A.4.4.3.5 Pemasangan lantai Ubin PC Warna Uk. 30 x 30 cm m2 131,285.83
4 A.4.4.3.6 Pemasangan lantai Ubin PC Warna Uk. 20 x 20 cm m2 194,381.42
5 A.4.4.3.9 Pemasangan lantai Ubin Granito Uk. 40 x 40 cm m2 288,536.12
6 A.4.4.3.16 Pemasangan Ubin Plin Pc.Abu-abu Uk. 15 x 20 cm m' 74,944.12
7 A.4.4.3.19 Pemasangan Ubin Plin Pc.Warna Uk. 10 x 20 cm m' 39,920.30
8 A.4.4.3.32 Pemasangan Lantai Keramik 10x 20 cm m2 214,663.66
9 A.4.4.3.33 Pemasangan lantai Keramik Uk. 10 x 10 cm / 5 x 20 cm m2 -
10 A.4.4.3.34 Pemasangan Lantai Keramik 33 x 33 cm m2 -
11 A.4.4.3.35 Pemasangan Lantai Keramik 30 x 30 cm m2 206,598.08
12 A.4.4.3.36 Pemasangan Lantai Keramik 20 x 20 cm m2 215,947.58
13 A.4.4.3.37 Pemasangan Lantai Keramik uk.10 x 33 cm, untuk variasi / border m2 -
14 A.4.4.3.39 Pemasangan Plint Keramik Ukuran 10x20 cm m' 29,658.70
15 A.4.4.3.40 Pemasangan Plint Keramik Ukuran 10x10 cm m' -
16 A.4.4.3.41 Pemasangan Plint Keramik Ukuran 5x20 cm m' 114,447.48
17 A.4.4.3.43 Pemasangan Lantai Marmer Ukuran 1.00x1.00 cm m2 149,197.03

HALAMAN 223 DARI 229 HALAMAN


KODE
No. URAIAN PEKERJAAN SAT. JUMLAH (Rp)
ANALISA

18 A.4.4.3.44 Pemasangan Lantai Karpet m2 88,642.00


19 A.4.4.3.46 Pemasangan Lantai Parquet Jati m2 360,640.00
20 A.4.4.3.48 Pemasangan Dinding Porselen 11 x 11 cm m2 -
21 A.4.4.3.49 Pemasangan Dinding Porselen 10x20 cm, m2 -
22 A.4.4.3.50 Pemasangan Dinding Porselen 20x20 cm, m2 -
23 A.4.4.3.53 Pemasangan Dinding Keramik 10x20 cm, m2 238,534.44
24 A.4.4.3.54 Pemasangan Dinding Keramik 20x20 cm, m2 237,845.88
25 A.4.4.3.55 Pemasangan Dinding Marmer Ukuran 1.00x1.00 cm m2 247,064.79
26 A.4.4.3.58 Pemasangan Dinding Batu Paros / Batu Tempel Hitam m2 292,836.00
27 A.4.4.3.59 Pemasangan Lantai Vynil uk.30 x 30 cm m2 -

HALAMAN 224 DARI 229 HALAMAN


KODE
No. URAIAN PEKERJAAN SAT. JUMLAH (Rp)
ANALISA

28 A.4.4.3.60 Pemasangan Wallpaper Lebar 50 Cm m2 657,794.25


29 A.4.4.3.63 Pemasangan Plint Kayu Klas II Ukuran 2x10 cm m' 65,826.00
30 A.4.4.3.64 Pemasangan Paving Block Natural Tebal 6 Cm m2 196,749.48
31 A.4.4.3.65 Pemasangan Paving Block Natural Tebal 8 Cm m2 232,410.98
32 A.4.4.3.66 Pemasangan Paving Block Berwarna Tebal 6 Cm m2 208,364.48
33 A.4.4.3.67 Pemasangan Paving Block Berwarna Tebal 8 Cm m2 244,025.98
IX A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT
1 A.4.5.1.1 Pemasangan Langit-langit Asbes (1,00x1,00) m, tebal 4 mm, 5 mm & 6 mm m2 33,930.75
2 A.4.5.1.2 Pemasangan Langit-langit Akustik Ukuran (30x30) cm m2 373,451.00
3 A.4.5.1.3 Pemasangan Langit-langit Akustik Ukuran (30x60) cm m2 257,398.75
4 A.4.5.1.4 Pemasangan Langit-langit Akustik Ukuran (60x120) cm m2 275,798.75
5 A.4.5.1.5 Memasang Langit-langit Tripleks Uk (120x240) cm, Tebal 3 mm, 4 mm & 6 mm m2 60,030.00
6 A.4.5.1.6 Memasang Langit-langit Lambriziring Kayu Jati, tebal 6 mm m2 370,127.50
7 A.4.5.1.7 Memasang Langit-langit Gypsum Board, Ukuran (120x240) tebal 9 mm m2 40,873.30
8 A.4.5.1.8 Memasang Langit-langit Akuatik Uk (60x120) cm & Berikut Rangka Allumunium m2 -
9 A.4.5.1.9 List Langit-Langit Kayu Profil m1 21,096.75
X A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP
1 A.4.5.2.1 Pemasangan Atap Genteng Plentong Kecil m2 84,671.63
2 A.4.5.2.2 Pemasangan Atap Genteng Kodok / Glasur m2 150,857.00
3 A.4.5.2.3 Pemasangan Atap Genteng Plentong Super / Besar m2 86,457.00
4 A.4.5.2.4 Pemasangan Genteng Bubung Plentong m' 127,587.90
5 A.4.5.2.5 Pemasangan Genteng Bubung Kodok / Glasur m' 124,712.90
6 A.4.5.2.6 Pemasangan Genteng Bubung Plentong Besar m' 118,962.90
7 A.4.5.2.7 Pemasangan Roof Light Fibreglass 90 x 180 m2 -
8 A.4.5.2.8 Pemasangan Atap Asbes Gelombang (2,50x0,92 m) x 5 mm m2 80,822.00
9 A.4.5.2.9 Pemasangan Atap Asbes Gelombang (2,25x0,92 m) x 5 mm m2 87,480.50
10 A.4.5.2.10 Pemasangan Atap Asbes Gelombang (2,00x0,92 m) x 5 mm m2 84,030.50
11 A.4.5.2.11 Pemasangan Atap Asbes Gelombang (1,80x0,92 m) x 5 mm m2 58,155.50
12 A.4.5.2.12 Pemasangan Atap Asbes Gelombang (3,00x1,05 m) x 4 mm m2 54,964.25
13 A.4.5.2.13 Pemasangan Atap Asbes Gelombang (2,70x1,05 m) x 4 mm m2 56,775.50
14 A.4.5.2.14 Pemasangan Atap Asbes Gelombang (2,40x1,05 m) x 4 mm m2 55,234.50
15 A.4.5.2.15 Pemasangan Atap Asbes Gelombang (2,10x1,05 m) x 4 mm m2 50,013.50
16 A.4.5.2.16 Pemasangan Atap Asbes Gelombang (1,50x1,05 m) x 4 mm m2 54,820.50
17 A.4.5.2.17 Pemasangan Atap Asbes Gelombang (3,00x1,08 m) x 6 mm m2 56,654.75
18 A.4.5.2.18 Pemasangan Atap Asbes Gelombang (2,70x1,08 m) x 6 mm m2 56,775.50
19 A.4.5.2.19 Pemasangan Atap Asbes Gelombang (2,40x1,08 m) x 6 mm m2 55,234.50
20 A.4.5.2.20 Pemasangan Atap Asbes Gelombang (2,10x1,08 m) x 6 mm m2 49,047.50
21 A.4.5.2.21 Pemasangan Atap Asbes Gelombang (1,80x1,08 m) x 6 mm m2 50,289.50
22 A.4.5.2.30 Pemasangan Atap Genteng Beton m2 127,914.50
23 A.4.5.2.31 Pemasangan Atap Genteng Aspal m2 -
24 A.4.5.2.32 Pemasangan Atap Genteng Metal m2 108,491.00
25 A.4.5.2.34 Pemasangan Atap Sirap m2 113,556.75
26 A.4.5.2.35 Pemasangan Nok Genteng Beton m' 126,381.55
27 A.4.5.2.36 Pemasangan Nok Genteng Aspal m' -
28 A.4.5.2.37 Pemasangan Nok Genteng Metal m' 78,648.50
29 A.4.5.2.38 Pemasangan Nok Sirap m' -
30 A.4.5.2.39 Pemasangan Atap Seng Gelombang m2 66,562.00
31 A.4.5.2.40 Pemasangan Atap Nok Seng m' 33,700.75
32 A.4.5.2.43 Pasang Allumunium Foil / Sisalation m2 87,532.25

HALAMAN 225 DARI 229 HALAMAN


KODE
No. URAIAN PEKERJAAN SAT. JUMLAH (Rp)
ANALISA

XI A.4.6.1 HARGA SATUAN PEKERJAAN KAYU


1 A.4.6.1.1 Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu klas I m3 17,070,025.00
2 A.4.6.1.2 Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu klas II atau III m3 20,592,762.50
3 A.4.6.1.3 Pembuatan & Pemasangan Pintu KlampStandard Kayu Klas II (Kayu Kamfer) m2 794,609.75
4 A.4.6.1.4 Pembuatan & Pemasangan Daun Pintu Klamp Sederhana Kayu Klas III m2 794,609.75
5 A.4.6.1.5 Pembuatan & Pemasangan Daun Pintu Panel, Kayu Klas I atau II m2 1,106,012.50
6 A.4.6.1.6 Pembuatan & Pemasangan Pintu & Jendela Kaca Kayu Klas I atau II m2 765,670.00
7 A.4.6.1.7 Pembuatan & Pemasangan Pintu & Jendela Jalusi Kayu Klas I atau II (jati) m2 1,300,362.50
8 A.4.6.1.8 Pembuatan&Pemasangan Pintu kayu lapis (Plywood) Rangkap m2 922,708.25
rangka Kayu Klas II (lbr s/d 90 cm)

HALAMAN 226 DARI 229 HALAMAN


KODE
No. URAIAN PEKERJAAN SAT. JUMLAH (Rp)
ANALISA

9 A.4.6.1.9 Pembuatan&Pemasangan Pintu Plywood rangkap, rangka expose kayu klas I atau II m2 980,018.50
10 A.4.6.1.10 Pembuatan & Pemasangan Jalusi mati Kosen Kayu Klas I atau II m2 1,118,863.75
11 A.4.6.1.11 Pembuatan & Pemasangan Pintu Teakwood Rangkap, Rangka Expose Kayu Klas I m2 891,284.50
12 A.4.6.1.12 Pembuatan & Pemasangan Pintu Teakwood Rangkap Lapis Formika, m2 930,948.00
Rangka expose Kayu Klas II
13 A.4.6.1.13 Pembuatan & Memasang Konstruksi Kuda-kuda Konvensional m3 18,503,040.00
Kayu I; II & III Bentang 6 meter
14 A.4.6.1.14 Pembuatan&Pemasangan Konstruksi Kuda-kuda Expose, Kayu Klas I m3 18,509,048.75
15 A.4.6.1.15 Pemasangan konstruksi Gording, Kayu Klas II m3 17,673,430.00
16 A.4.6.1.16 Pemasangan Rangka Atap Genteng Keramik, Kayu Klas II m2 287,620.75
17 A.4.6.1.17 Pemasangan Rangka Atap Genteng Beton, Kayu Klas II m2 340,612.75
18 A.4.6.1.18 Pemasangan Rangka Atap Sirap, Kayu Klas II m2 237,923.50
19 A.4.6.1.19 Pemasangan Rangka Langit-langit (50x1,00) m, kayu Klas II atau III m2 292,496.75
20 A.4.6.1.20 Pemasangan Rangka Langit-langit (60x60) cm, kayu Klas II atau III m2 303,703.50
21 A.4.6.1.21 Pemasangan Listplank Uk. (3x20)cm Kayu klas I atau II m' 174,253.75
22 A.4.6.1.22 Pemasangan Listplank Uk. (3x30)cm Kayu klas I atau klas II m' 208,466.25
23 A.4.6.1.23 Pemasangan Rangka Dinding Pemisah (60x120) cm Kayu klas II atau III m2 487,732.25
24 A.4.6.1.24 Pemasangan Dinding Pemisah Teakwood Rangkap Rangka Kayu Klas II m2 584,677.25
25 A.4.6.1.25 Pemasangan Dinding Pemisah Plywood Rangkap Rangka Kayu Klas II m2 592,020.00
26 A.4.6.1.26 Pemasangan Dinding Lambriziring dari Papan Kelas I m2 381,110.00
27 A.4.6.1.27 Pemasangan Dinding Lambriziring dari Plywood ukuran (120x240) cm m2 52,319.25
28 A.4.6.1.28 Pemasangan Dinding Bilik, Rangka Kayu Klas III atau IV m2 -
XII A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI dan KACA
1 A.4.6.2.2 Pemasangan Kunci Tanam Biasa Buah 140,731.25
2 A.4.6.2.3 Pemasangan Kunci Kamar Mandi Buah 139,365.63
3 A.4.6.2.4 Pemasangan Kunci Selinder Buah 145,115.63
4 A.4.6.2.5 Pemasangan Engsel Pintu Buah 50,096.88
5 A.4.6.2.6 Pemasangan Engsel Jendela Kupu-kupu Buah 24,006.25
6 A.4.6.2.7 Pemasangan Engsel Angin Buah 53,075.38
7 A.4.6.2.9 Pemasangan Kait Angin Buah 38,657.25
8 A.4.6.2.10 Pasang Door Closer Buah 292,689.38
9 A.4.6.2.11 Pemasangan Kunci Selot Buah 50,375.75
10 A.4.6.2.13 Pemasangan Door Stop Buah 186,187.88
11 A.4.6.2.14 Pemasangan Rel Pintu Dorong Buah 352,377.25
12 A.4.6.2.15 Pemasangan Kunci Lemari Buah -
13 A.4.6.2.16 Pemasangan Kaca tebal 3 mm m2 178,656.81
14 A.4.6.2.17 Pemasangan Kaca tebal 5 mm m2 210,281.81
15 A.4.6.2.18 Pemasangan Kaca Cermin tebal 5 mm m2 760,556.81
XIII A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN
1 A.4.7.1.1 Pengikisan / pengerokan Permukaan Cat Tembok Lama m2 20,774.75
2 A.4.7.1.2 Pencucian Bidang Permukaan Tembok yang Pernah dicat m2 21,637.25
3 A.4.7.1.3 Pengerokan Karat Cat Lama permukaan Baja dg cara manual m2 22,241.00
4 A.4.7.1.4 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penutup) m2 46,776.25
5 A.4.7.1.5 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 3 Lp Cat Penutup) m2 63,267.25
6 A.4.7.1.6 Pelaburan Bidang Kayu dg Teak Oil m2 -
7 A.4.7.1.7 Pelaburan Bidang Kayu dg Politur m2 49,586.85
8 A.4.7.1.8 Pelaburan Bidang Kayu dg Cat Residu & Ter m2 11,373.50
9 A.4.7.1.9 Pelaburan Bidang Kayu dg Vernis m2 46,741.75
10 A.4.7.1.10 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 Lap.Cat Penutup) m2 24,697.98

HALAMAN 227 DARI 229 HALAMAN


KODE
No. URAIAN PEKERJAAN SAT. JUMLAH (Rp)
ANALISA

11 A.4.7.1.11 Pengecatan Tembok Lama (1lap.Plamir, 2lap Cat Penutup) m2 16,900.40


12 A.4.7.1.12 Pengecatan Tembok dengan Kalkarium m2 9,080.40
13 A.4.7.1.13 Pelaburan Tembok dengan Kapur Sirih m2 -
14 A.4.7.1.14 Pelaburan Tembok lama dengan Kapur Sirih (pemeliharaan) m2 -
15 A.4.7.1.15 Pemasangan Wallpaper m2 358,756.88
16 A.4.7.1.16 Pengecatan Permukaan Baja dg Meni Besi m2 28,373.38
17 A.4.7.1.17 Pengecatan Permukaan Baja dg Meni Besi & Perancah m2 57,600.63
XIV A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
1 A.5.1.1.1 Pemasangan Closet Duduk / Mono Blok Unit 2,217,090.75
2 A.5.1.1.2 Pemasangan Closet Jongkok Porselen Unit 654,580.00

HALAMAN 228 DARI 229 HALAMAN


KODE
No. URAIAN PEKERJAAN SAT. JUMLAH (Rp)
ANALISA

3 A.5.1.1.4 Pemasangan Urinoir Unit #VALUE!


4 A.5.1.1.5 Pemasangan Wastafel Unit 841,397.50
5 A.5.1.1.6 Pemasangan Bathtube porselen Unit -
6 A.5.1.1.7 Pemasangan Bak Fibreglass vol.1 m3 Unit 1,140,052.50
7 A.5.1.1.8 Memasang Bak Mandi Batu Bata Vol. 0,30 m3 Unit -
8 A.5.1.1.11 Pemasangan Bak Beton Bertulang Vol. 1 m3 Unit -
9 A.5.1.1.12 Pemasangan Bak Cuci Piring Stainless stell buah 243,943.75
10 A.5.1.1.14 Pemasangan Floor Drain buah 42,981.25
11 A.5.1.1.15 Pemasangan Bak Kontrol Pas.Batu Bata 30x30 tinggi 35 cm bh 495,425.75
12 A.5.1.1.16 Pemasangan Bak Kontrol Pas.Batu Bata 45 x 45 tinggi 50 cm bh 732,854.75
13 A.5.1.1.17 Pemasangan Bak Kontrol Pas.Batu Bata 60x60 tinggi 60 cm bh 918,449.80
14 A.5.1.1.18 Pemasangan Pipa Galvanis Ø ½" m' 132,376.50
15 A.5.1.1.19 Pemasangan Kran Ø ½" atau Ø ¾" bh 77,673.88
16 A.5.1.1.20 Pemasangan Pipa Galvanis Ø ¾" m' 260,737.20
17 A.5.1.1.21 Pemasangan Pipa Galvanis Ø 1" m' 414,248.40
18 A.5.1.1.22 Pemasangan Pipa Galvanis Ø 1½ " m' 329,257.65
19 A.5.1.1.23 Pemasangan Pipa Galvanis Ø 3" m' 182,574.00
20 A.5.1.1.24 Pemasangan Pipa Galvanis Ø 4" m' 295,471.80
21 A.5.1.1.25 Pemasangan Pipa PVC tipe AW Ø ½" m' 22,821.75
22 A.5.1.1.26 Pemasangan Pipa PVC tipe AW Ø ¾" m' 27,013.50
23 A.5.1.1.27 Pemasangan Pipa PVC tipe AW Ø 1" m' 31,903.88
24 A.5.1.1.28 Pemasangan Pipa PVC tipe AW Ø 1½" m' 42,383.25
25 A.5.1.1.29 Pemasangan Pipa PVC tipe AW Ø 2" m' 53,561.25
26 A.5.1.1.31 Pemasangan Pipa PVC tipe AW Ø 3" m' 84,240.38
27 A.5.1.1.32 Pemasangan Pipa PVC tipe AW Ø 4" m' 91,287.00
28 A.5.1.1.33 Pemasangan Pipa Air Limbah Jenis Pipa Tanah Ø 20 cm m' -
29 A.5.1.1.34 Pemasangan Pipa Air Limbah Jenis Pipa Tanah Ø 15 cm m' -
30 A.5.1.1.35 Pemasangan Pipa Beton Ø 20 cm m' 156,266.49
31 A.5.1.1.36 Pemasangan Pipa Beton Ø 30 cm m' 268,357.68
XV A.8.4.6 HARGA SATUAN PEKERJAAN ELEKTRIKAL
1 A.8.4.6.1 Pemasangan Lampu Titik -
2 A.8.4.6.2 Pemasangan MCB buah -
3 K.618a Lapis Penetrasi Makadam 5 cm (Lapen) Menggunakan Buruh m2 106,254.99
4 K.637a Propelering Penetrasi Makadam (Menggunakan Buruh) m3 1,979,832.94
5 K.516 Konstruksi Lapis Pondasi Bawah (LPB) Menggunakan Buruh m3 503,265.73
6 K.621b Membuat Campuran, Menghampar dan Pemadatan Latasir 2 cm m2 77,885.85
7 K.210 Pengupasan Tanah dan Pembersihan Semak pada Damija m2 2,530.00
8 K.T04 Pelapisan Prime Coat (menggunakan buruh) m2 16,434.65

Slawi, Desember 2019


Kepala Dinas Perumahan Rakyat, Kawasan Permukiman,
Tata Ruang dan Pertanahan Kabupaten Tegal

JAENAL DASMIN, BE, S.Sos, MM


NIP. 196510151989031008