Anda di halaman 1dari 41

```

REKAPITULASI
( OWNER ESTIMATE )
#REF!
KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :

No URAIAN PEKERJAAN JUMLAH HARGA


Rp.

A. PEKERJAAN PERSIAPAN 13,675,518.75

II. PEKERJAAN TANAH 6,438,816.22

III. PEKERJAAN PASANGAN & BETON 183,402,255.75

IV. PEKERJAAN PLESTERAN 0.00

V. PEKERJAAN LANTAI 43,365,593.10

VI. PEKERJAAN KAYU KUSEN, PINTU & JENDELA 15,468,363.91

VII. PEKERJAAN ATAP & PLAFOND 116,611,889.47

VIII. PEKERJAAN KUNCI & PENGGANTUNG 7,187,787.50

IX. PEKERJAAN PENGECATAN 784,657.82

X. PEKERJAAN SANITASI AIR 7,294,312.38

XI. PEKERJAAN INSTALASI LISTRIK 10,493,244.12

XII. PEKERJAAN LAIN LAIN 4,000,000.00

(i) JUMLAH 408,722,439.00


( ii ) JUMLAH DIBULATKAN 408,722,000.00
REKAPITULASI HARGA

( OWNER ESTIMATE )
KEGIATAN : FASILITAS SARANA RUANG RAPAT
PEKERJAAN : PEMBANGUNAN RUANG RAPAT DAN RUANG VISUAL KANTOR KEHUTANAN ( MASOHI )
LOKASI : MASOHI - KABUPATEN MALUKU TENGAH
TAHUN ANGGARAN : 2023

No URAIAN PEKERJAAN JUMLAH HARGA


Rp.

A. PEKERJAAN PERSIAPAN 13,675,518.75


B. ALATPELINDUNG KERJA DANALAT PELINDUNG DIRI 31,500,000.00
C. PEKERJAAN TANAH 6,438,816.22
D. PEKERJAAN PASANGAN & BETON 183,402,255.75
E. PEKERJAAN PLESTERAN -
F. PEKERJAAN LANTAI 43,365,593.10
G. PEKERJAAN KAYU KUSEN, PINTU & JENDELA 15,468,363.91
H. PEKERJAAN ATAP & PLAFOND 116,611,889.47
I. PEKERJAAN KUNCI & PENGGANTUNG 7,187,787.50
J. PEKERJAAN PENGECATAN 784,657.82
K. PEKERJAAN SANITASI AIR 7,294,312.38
L. PEKERJAAN INSTALASI LISTRIK 10,493,244.12
M. PEKERJAAN LAIN LAIN 4,000,000.00

I. JUMLAH PEKERJAAN KONSTRUKSI 440,222,439.00

II. PAJAK PERTAMBAHAN NILAI ( PPN ) 11% 48,424,468.29

IV. JUMLAH DIBULATKAN 488,646,907.00

TERBILANG :

Empat Ratus Delapan Puluh Delapan Juta Enam Ratus Empat Puluh Enam Ribu Sembilan Ratus Tujuh Rupiah

Masohi,……………………………
Dibuat Oleh,
PEJABAT PEMBUAT KOMITMEN

Nn
NIP. …………………………….
DAFTAR KUANTITAS DAN HARGA
KEGIATAN : FASILITAS SARANA RUANG RAPAT
PEKERJAAN : PEMBANGUNAN RUANG RAPAT DAN RUANG VISUAL KANTOR KEHUTANAN ( MASOHI )
LOKASI : MASOHI - KABUPATEN MALUKU TENGAH
TAHUN ANGGARAN : 2023

HARGA SATUAN JUMLAH HARGA


NO. JENIS PEKERJAAN SAT VOLUME
( Rp. ) ( Rp. )

A. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi M2 100.00 28,750.00 2,875,000.00
2 Pengukuran & Pemasangan Bouplank Ls 1.00 1,000,000.00 1,000,000.00
3 Pembuatan Nama Proyek Ls 1.00 500,000.00 500,000.00
4 Dokumentasi Ls 1.00 500,000.00 500,000.00
5 Pembuatan gudang dan alat-alat M2 5.00 1,760,103.75 8,800,518.75
● Sub Total A : 13,675,518.75
B. ALATPELINDUNG KERJA DANALAT PELINDUNG DIRI
1 Jaring Pengaman (Safety Net) Ls 1.00 1,500,000.00 1,500,000.00
2 Tali Keselamatan (Life Line) Ls 1.00 1,000,000.00 1,000,000.00
3 Penahan Jatuh (Safety Deck) Ls 1.00 2,500,000.00 2,500,000.00
4 Pagar Pengaman (Guard Railing) Ls 1.00 2,500,000.00 2,500,000.00
5 Pembatas Area (Restricd Area) Ls 1.00 1,500,000.00 1,500,000.00
6 Topi Pelindung (Safety Helmet) Bh 20.00 50,000.00 1,000,000.00
7 Pelindung Mata (Goggles, Spectacles) Psg 20.00 30,000.00 600,000.00
8 Tameng Muka (Face Shield) Bh 50.00 35,000.00 1,750,000.00
9 Pelindung Pernafasan dan Mulut (Masker) Psg 50.00 35,000.00 1,750,000.00
10 Sarung Tangan (Safety Gloves) Psg 20.00 25,000.00 500,000.00
11 Sepatu Keselamatan (Safety Shoes) Psg 20.00 160,000.00 3,200,000.00
12 Penunjang Seluruh Tubuh (Full Body Harness) Bh 20.00 500,000.00 10,000,000.00
13 Rompi Keselamatan (Safety Vest) Bh 20.00 35,000.00 700,000.00
14 Pelindung Jatuh (Fall Arrester) Bh 10.00 300,000.00 3,000,000.00
15 Pelindung Telinga Bh 165.00 35,000.00 5,775,000.00
● Sub Total B : 31,500,000.00
C. PEKERJAAN TANAH
1 Galian tanah untuk pondasi M3 6.50 135,125.00 878,312.50
2 Urugan ( sirtu ) tanah dari luar M 3
4.40 200,675.00 882,566.30
3 Urugan tanah bekas galian/timbunan kembali M3 5.11 97,750.00 499,919.64
4 Urugan pilihan dibawah pondasi & lantai M3 7.12 586,730.00 4,178,017.79
● Sub Total C : 6,438,816.22
D. PEKERJAAN PASANGAN & BETON
1 Pasangan batu kosong M3 5.18 1,755,764.80 9,097,381.19
2 Pasangan rolaag batu bata 1 pc : 4psr M3 0.60 805,994.75 483,596.85
3 Pasangan pondasi batu kali 1 pc : 5psr M 3
6.76 2,251,424.00 15,219,626.24
4 Pasangan dinding batu bata 1pc : 4psr M2 145.47 694,910.50 101,088,630.44
5 Beton bertulang camp. 1 pc : 2 kr : 3 psr
- Beton Sloof 15 / 20 M3 1.46 11,304,154.12 16,549,281.63
- Beton Kolom 20/ 20 M 3
1.52 15,165,859.25 23,074,915.51
- Rink Balk 15/ 20 M3 1.58 11,304,154.12 17,888,823.89
- Rink Balk 15/ 15 Kaki kuda - kuda beton M3 0.55
● Sub Total D : 183,402,255.75
E. PEKERJAAN PLESTERAN
1 Plesteran dinding 1 pc : 5 psr M2 96,273.79 -
HARGA SATUAN JUMLAH HARGA
NO. JENIS PEKERJAAN SAT VOLUME
( Rp. ) ( Rp. )

2 Acian dinding M2 57,192.59 -


● Sub Total E : -
F. PEKERJAAN LANTAI
1 Rabat Dibawah Lantai Keramik & Rabat M3 2.56 424,516.06 1,087,902.00
Keliling Bangunan, 1 pc : 3 kr : 5 psr, t = 5 cm
2 Pemasangan keramik 40 x 40 cm M2 48.72 710,550.50 34,620,152.01
3 Pasang Keramik Anti Slip Wc/KM 20x20 M 2
1.96 506,534.75 991,541.77
4 Pasang Keramik Dinding Wc/Km 15x20 M2 8.10 506,534.75 4,102,931.48
5 Pasang kemaik Dinding dan Meja Dapur 25x40 M2 5.06 506,534.75 2,563,065.84
● Sub Total F : 43,365,593.10
G. PEKERJAAN KAYU KUSEN, PINTU & JENDELA
1 Kusen pintu / jendela kayu klas I M3 0.11 12,132,500.00 1,383,105.00
2 Pintu panel kayu klas I M2 6.54 1,946,375.00 12,729,292.50
3 Pintu Panel tripleks lapis alumanium M2 1.19 241,200.00 287,992.80
4 Ventilasi kayu yang diserut M3 0.12 876,300.00 104,717.85
5 Jendela bingkai kaca 3 mm M 2
0.80 1,209,512.50 963,255.76
● Sub Total G. : 15,468,363.91
H. PEKERJAAN ATAP & PLAFOND
1 Pasang kuda-kuda kayu klas II (Merenati) M3 0.57 9,782,187.50 5,608,292.43
2 Pasang gording kayu klas II M 3
0.73 9,537,927.50 6,948,380.18
3 Pasang lisplank kayu klas II (Meranti) M' 53.72 674,130.00 36,214,263.60
4 Pasang atap senk Bjls 0.25 M2 111.10 475,467.50 52,825,580.37
5 Pasang rangka plafond kayu klas II + triplek 3 mm M2 51.25 220,104.25 11,281,168.20
6 Pasang bumbungan Plat Senk M 1
10.31 362,192.50 3,734,204.68
● Sub Total H : 116,611,889.47
I. PEKERJAAN KUNCI & PENGGANTUNG
1 Pasang kunci tanam Bh 5.00 257,887.50 1,289,437.50
2 Pasang engsel pintu Psg 17.00 128,110.00 2,177,870.00
3 Pasang engsel jendela Psg 16.00 98,497.50 1,575,960.00
4 Pasang grendel jendela Bh 8.00 82,570.00 660,560.00
5 Pasang kait angin Bh 16.00 92,747.50 1,483,960.00
● Sub Total I : 7,187,787.50
J. PEKERJAAN PENGECATAN
1 Pengecatan kayu kusen pintu & jendela M2 58,425.75 -
2 Pengecatan dinding M 2
40,794.34 -
3 Pengecatan plafond M2 40,794.34 -
4 Pengecatan lesplank M 2
13.43 58,425.75 784,657.82
● Sub Total J : 784,657.82
K. PEKERJAAN SANITASI AIR
1 Kloset Jongkok Bh 1.00 3,877,052.50 3,877,052.50
2 Pasang Bak Mandi Bh 1.00 505,304.25 505,304.25
3 Pasang Tempat Cuci Piring Stanlis Bh 1.00 350,000.00 350,000.00
4 Kran diameter 1/2" Bh 3.00 112,053.13 336,159.38
5 Floor drain Bh 1.00 106,283.00 106,283.00
6 Pipa PVC tipe AW diameter 1/2" M1 10.00 124,677.25 1,246,772.50
7 PVC tipe D diameter 4" M1 7.00 124,677.25 872,740.75
● Sub Total K : 7,294,312.38
L. PEKERJAAN INSTALASI LISTRIK
1 Titik instalasi lampu Ttk 16.00 267,950.00 4,287,200.00
2 Lampu pijar philips 23 Watt Bh 7.00 149,500.00 1,046,500.00
3 Stop kontak Bh 5.00 168,008.78 840,043.89
4 Saklar tunggal Bh 4.00 146,187.53 584,750.11
5 Saklar ganda Bh 4.00 146,187.53 584,750.11
6 Mcb/secring Unit 1.00 150,000.00 150,000.00
7 Biaya Penyambungan Daya ( 900 Watt ) Ls 1.00 3,000,000.00 3,000,000.00
● Sub Total L : 10,493,244.12
M. PEKERJAAN LAIN LAIN
2 Pembersihan akhir Ls 1.00 1,000,000.00 1,000,000.00
3 Air Kerja Ls 1.00 1,000,000.00 1,000,000.00
4 Listrik Kerja Ls 1.00 2,000,000.00 2,000,000.00
● Sub Total M : 4,000,000.00
HARGA SATUAN JUMLAH HARGA
NO. JENIS PEKERJAAN SAT VOLUME
( Rp. ) ( Rp. )
ANALISA HARGA SATUAN PEKERJAAN
KEGIATAN : FASILITAS SARANA RUANG RAPAT
PEKERJAAN : PEMBANGUNAN RUANG RAPAT DAN RUANG VISUAL KANTOR KEHUTANAN ( MASOHI )
LOKASI : MASOHI - KABUPATEN MALUKU TENGAH
TAHUN ANGGARAN : 2023

No. URAIAN PEKERJAAN KODE SATUAN KOIFISIEN HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )

1 A. 2.2.1.2. 1 M'. PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI = 2 M


A. Bahan
Kayu Klas II 5/7 M3 0.040 1,500,000.00 60,000.00
PC Kg 2.500 1,900.00 4,750.00
Seng gelombang 3" - 5" Lbr 1.200 80,000.00 96,000.00
Pasir beton M3 0.005 440,000.00 2,200.00
Koral beton M3 0.009 220,000.00 1,980.00
Paku usuk 2" - 5 " Kg 0.060 24,000.00 1,440.00
Meni besi Kg 0.450 47,000.00 21,150.00
Jumlah harga bahan 187,520.00
B. Tenaga
Tukang kayu L.02 Oh 1.000 175,000.00 175,000.00
Pekerja L.01 Oh 2.000 150,000.00 300,000.00
Kepala tukang L.03 Oh 0.500 185,000.00 92,500.00
Mandor L.04 Oh 0.500 200,000.00 100,000.00
Jumlah harga tenaga kerja 667,500.00
C. Peralatan
Jumlah harga peralatan

D. JUMLAH ( A+B+C) 855,020.00


E. OVERHEAD & PROFIT 15%XD 128,253.00
F. HARGA SATUAN PEKERJAAN ( D+E) 983,273.00

2 A.2.2.1.4 1 M' PENGUKURAN DAN PEMASANGAN BOUPLANK


A. Bahan
Kayu Klas II 5/7 M3 0.012 1,500,000.00 18,000.00
Paku usuk 2" - 5 " Kg 0.020 24,000.00 480.00
Kayu papan klas II 2/20 M3 0.007 1,500,000.00 10,500.00
Jumlah harga bahan 28,980.00
B. Tenaga
Tukang kayu L.02 Oh 0.100 175,000.00 17,500.00
Pekerja L.01 Oh 0.100 150,000.00 15,000.00
Kepala tukang L.03 Oh 0.010 185,000.00 1,850.00
Mandor L.04 Oh 0.005 200,000.00 1,000.00
Jumlah harga tenaga kerja 35,350.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 64,330.00


E. OVERHEAD & PROFIT 15%XD 9,649.50
F. HARGA SATUAN PEKERJAAN ( D+E) 73,979.50

3 A.2.2.1.5. 1 M2 PEMBUATAN KANTOR SEMENTARA, DENGAN LANTAI PLESTERAN


A. Bahan
Kayu Klas II 6/12 M3 0.180 1,500,000.00 270,000.00
Kayu Klas II 5/7 M3 0.085 1,500,000.00 127,500.00
Besi strip Kg 1.100 20,000.00 22,000.00
PC Kg 35.000 1,900.00 66,500.00
Pasir pasang M3 0.150 440,000.00 66,000.00
Pasir beton M3 0.100 440,000.00 44,000.00
Koral beton M3 0.150 220,000.00 33,000.00
Bata merah Bh 30.000 2,000.00 60,000.00
Seng plat Lbr 0.250 50,000.00 12,500.00
Jendela naco Bh 2.000 25,000.00 50,000.00
Kaca polos M2 0.080 125,000.00 10,000.00
Kunci tanam Bh 0.150 125,000.00 18,750.00
Triplek 4 mm Lbr 0.060 85,000.00 5,100.00
Jumlah harga bahan 785,350.00
B. Tenaga
Tukang kayu L.02 Oh 2.000 175,000.00 350,000.00
Tukang batu L.02 Oh 1.000 175,000.00 175,000.00
Pekerja L.01 Oh 2.000 150,000.00 300,000.00
Kepala tukang L.03 Oh 0.300 185,000.00 55,500.00
Mandor L.04 Oh 0.050 200,000.00 10,000.00
Jumlah harga tenaga kerj 890,500.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 1,675,850.00


E. OVERHEAD & PROFIT 15%XD 251,377.50
F. HARGA SATUAN PEKERJAAN ( D+E) 1,927,227.50
No. URAIAN PEKERJAAN KODE SATUAN KOIFISIEN HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )

4 A.2.2.1.7 1 M2 PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT


A. Bahan
Kayu Klas II 6/12 M3 0.210 1,500,000.00 315,000.00
Paku usuk 2" - 5 " Kg 0.300 24,000.00 7,200.00
PC Kg 8.750 1,900.00 16,625.00
Pasir beton M3 0.030 440,000.00 13,200.00
Koral beton M3 0.050 220,000.00 11,000.00
Seng gelombang Lbr 1.500 80,000.00 120,000.00
Seng plat Lbr 0.250 50,000.00 12,500.00
Jumlah harga bahan 495,525.00
B. Tenaga
Tukang kayu L.02 Oh 2.000 175,000.00 350,000.00
Pekerja L.01 Oh 2.000 150,000.00 300,000.00
Kepala tukang L.03 Oh 1.000 185,000.00 185,000.00
Mandor L.04 Oh 1.000 200,000.00 200,000.00
Jumlah harga tenaga kerja 1,035,000.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 1,530,525.00


E. OVERHEAD & PROFIT 15%XD 229,578.75
F. HARGA SATUAN PEKERJAAN ( D+E) 1,760,103.75

5 A.2.2.1.9 1 M2 MEMBERSIHKAN LAPANGAN DAN PERATAAN


A. Tenaga
Pekerja L.01 Oh 0.100 150,000.00 15,000.00
Mandor L.04 Oh 0.050 200,000.00 10,000.00
Jumlah harga tenaga kerja 25,000.00
B. Bahan

Jumlah harga bahan


C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 25,000.00


E. OVERHEAD & PROFIT 15%XD 3,750.00
F. HARGA SATUAN PEKERJAAN ( D+E) 28,750.00

6 A.2.2.1.8 1 M2 PEMBUATAN BEDENG PEKERJA


A. Bahan
Kayu Klass II 6/12 M3 0.186 1,500,000.00 279,000.00
Paku usuk 2" - 5 " Kg 0.300 24,000.00 7,200.00
PC Kg 18.000 1,900.00 34,200.00
Pasir beton M3 0.030 440,000.00 13,200.00
Koral beton M3 0.050 220,000.00 11,000.00
Seng gelombang BJLS 32 M3 1.500 80,000.00 120,000.00
Triplek 4 mm Lbr 1.350 85,000.00 114,750.00
Jumlah harga bahan 579,350.00
B. Tenaga
Tukang kayu L.02 Oh 2.000 175,000.00 350,000.00
Pekerja L.01 Oh 1.000 150,000.00 150,000.00
Kepala tukang L.03 Oh 0.200 185,000.00 37,000.00
Mandor L.04 Oh 0.050 200,000.00 10,000.00
Jumlah harga tenaga kerja 547,000.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 1,126,350.00


E. OVERHEAD & PROFIT 15%XD 168,952.50
F. HARGA SATUAN PEKERJAAN ( D+E) 1,295,302.50

7 A.2.3.1.1. 1 M3 GALIAN TANAH BIASA SEDALAM 1 M


A. Tenaga
Pekerja L.01 Oh 0.750 150,000.00 112,500.00
Mandor L.04 Oh 0.025 200,000.00 5,000.00
Jumlah harga tenaga kerja 117,500.00
B. Bahan

Jumlah harga bahan


C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 117,500.00


E. OVERHEAD & PROFIT 15%XD 17,625.00
F. HARGA SATUAN PEKERJAAN ( D+E) 135,125.00
No. URAIAN PEKERJAAN KODE SATUAN KOIFISIEN HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )

8 A.2.3.1.2. 1 M3 GALIAN TANAH BIASA SEDALAM 2 M


A. Tenaga
Pekerja L.01 Oh 0.900 150,000.00 135,000.00
Mandor L.04 Oh 0.045 200,000.00 9,000.00
Jumlah harga tenaga kerja 144,000.00
B. Bahan

Jumlah harga bahan


C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 144,000.00


E. OVERHEAD & PROFIT 15%XD 21,600.00
F. HARGA SATUAN PEKERJAAN ( D+E) 165,600.00

9 A.2.3.1.9. 1 M3 URUGAN TANAH KEMBALI


A. Tenaga
Pekerja L.01 Oh 0.500 150,000.00 75,000.00
Mandor L.04 Oh 0.050 200,000.00 10,000.00
Jumlah harga tenaga kerja 85,000.00
B. Bahan

Jumlah harga bahan


C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 85,000.00


E. OVERHEAD & PROFIT 15%XD 12,750.00
F. HARGA SATUAN PEKERJAAN ( D+E) 97,750.00

10 A.2.3.1.10. 1 M3 PEMADATAN TANAH


A. Tenaga
Pekerja L.01 Oh 0.500 150,000.00 75,000.00
Mandor L.04 Oh 0.050 200,000.00 10,000.00
Jumlah harga tenaga kerja 85,000.00
B. Bahan

Jumlah harga bahan


C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 85,000.00


E. OVERHEAD & PROFIT 15%XD 12,750.00
F. HARGA SATUAN PEKERJAAN ( D+E) 97,750.00

11 A.2.3.1.11. 1 M3 URUGAN PASIR


A. Bahan
Pasir urug M3 1.200 386,000.00 463,200.00
Jumlah harga bahan 463,200.00
B. Tenaga
Pekerja L.01 Oh 0.300 150,000.00 45,000.00
Mandor L.04 Oh 0.010 200,000.00 2,000.00
Jumlah harga tenaga kerja 47,000.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 510,200.00


E. OVERHEAD & PROFIT 15%XD 76,530.00
F. HARGA SATUAN PEKERJAAN ( D+E) 586,730.00

12 A.2.3.1.11. 1 M3 URUGAN SIRTU


A. Bahan
Sirtu M3 1.200 110,000.00 132,000.00
Jumlah harga bahan 132,000.00
B. Tenaga
Pekerja L.01 Oh 0.250 150,000.00 37,500.00
Mandor L.04 Oh 0.025 200,000.00 5,000.00
Jumlah harga tenaga kerja 42,500.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 174,500.00


E. OVERHEAD & PROFIT 15%XD 26,175.00
F. HARGA SATUAN PEKERJAAN ( D+E) 200,675.00
No. URAIAN PEKERJAAN KODE SATUAN KOIFISIEN HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )

13 A.3.2.1.3. 1 M3 PASANG PONDASI BATU BELAH 1PC : 4PSR


A. Bahan
Batu belah M3 1.200 500,000.00 600,000.00
Semen PC Kg 136.000 1,900.00 258,400.00
Pasir pasang M3 0.544 440,000.00 239,360.00
Jumlah harga bahan 1,097,760.00
B. Tenaga
Pekerja L.01 Oh 2.000 150,000.00 300,000.00
Tukang batu L.02 Oh 1.000 175,000.00 175,000.00
Kepala tukang batu L.03 Oh 1.000 185,000.00 185,000.00
Mandor L.04 Oh 1.000 200,000.00 200,000.00
Jumlah harga tenaga kerja 860,000.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 1,957,760.00


E. OVERHEAD & PROFIT 15%XD 293,664.00
F. HARGA SATUAN PEKERJAAN ( D+E) 2,251,424.00

14 A.2.3.1.14. 1 M3 PASANGAN PONDASI BATU KOSONG


A. Bahan
Batu belah M3 1.000 500,000.00 500,000.00
Pasir urug M3 0.432 386,000.00 166,752.00
Jumlah harga bahan 666,752.00
B. Tenaga
Pekerja L.01 Oh 2.000 150,000.00 300,000.00
Tukang batu L.02 Oh 1.000 175,000.00 175,000.00
Kepala tukang batu L.03 Oh 1.000 185,000.00 185,000.00
Mandor L.04 Oh 1.000 200,000.00 200,000.00
Jumlah harga tenaga kerja 860,000.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 1,526,752.00


E. OVERHEAD & PROFIT 15%XD 229,012.80
F. HARGA SATUAN PEKERJAAN ( D+E) 1,755,764.80

15 A.4.4.1.3 1 M2 PASANGAN BATU BATA TEBAL 1 BATA, 1PC : 4PSR (ROLAAG)


A. Bahan
Batu bata Bh 46.000 2,000.00 92,000.00
Semen PC Kg 26.550 1,900.00 50,445.00
Pasir pasang M3 0.093 440,000.00 40,920.00
Jumlah harga bahan 183,365.00
B. Tenaga
Pekerja L.01 Oh 1.000 150,000.00 150,000.00
Tukang batu L.02 Oh 1.000 175,000.00 175,000.00
Kepala tukang batu L.03 Oh 0.500 185,000.00 92,500.00
Mandor L.04 Oh 0.500 200,000.00 100,000.00
Jumlah harga tenaga kerja 517,500.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 700,865.00


E. OVERHEAD & PROFIT 15%XD 105,129.75
F. HARGA SATUAN PEKERJAAN ( D+E) 805,994.75

1 M3 PASANGAN BATU BATA ROLLAG 6,716,622.92


16 A.4.4.1.7 1 M2 PASANGAN BATU BATA TEBAL 1/2 BATA, 1PC : 2PSR
A. Bahan
Batu bata Bh 23.000 2,000.00 46,000.00
Semen PC Kg 18.950 1,900.00 36,005.00
Pasir pasang M3 0.038 440,000.00 16,720.00
Jumlah harga bahan 98,725.00
B. Tenaga
Pekerja L.01 Oh 0.300 150,000.00 45,000.00
Tukang batu L.02 Oh 0.100 175,000.00 17,500.00
Kepala tukang batu L.03 Oh 0.010 185,000.00 1,850.00
Mandor L.04 Oh 0.015 200,000.00 3,000.00
Jumlah harga tenaga kerja 67,350.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 166,075.00


E. OVERHEAD & PROFIT 15%XD 24,911.25
F. HARGA SATUAN PEKERJAAN ( D+E) 190,986.25
No. URAIAN PEKERJAAN KODE SATUAN KOIFISIEN HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )

17 A.4.4.1.9 1 M2 PASANGAN BATU BATA TEBAL 1/2 BATA, 1PC : 4PSR


A. Bahan
Batu bata Bh 23.000 2,000.00 46,000.00
Semen PC Kg 11.500 1,900.00 21,850.00
Pasir pasang M3 0.043 440,000.00 18,920.00
Jumlah harga bahan 86,770.00
B. Tenaga
Pekerja L.01 Oh 1.000 150,000.00 150,000.00
Tukang batu L.02 Oh 1.000 175,000.00 175,000.00
Kepala tukang batu L.03 Oh 0.500 185,000.00 92,500.00
Mandor L.04 Oh 0.500 200,000.00 100,000.00
Jumlah harga tenaga kerja 517,500.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 604,270.00


E. OVERHEAD & PROFIT 15%XD 90,640.50
F. HARGA SATUAN PEKERJAAN ( D+E) 694,910.50

18 A.4.4.2.2 1 M2 PLESTERAN, 1PC : 2PSR, TEBAL 15 MM


A. Bahan
Semen PC Kg 10.224 1,900.00 19,425.60
Pasir pasang M3 0.020 440,000.00 8,800.00
Jumlah harga bahan 28,225.60
B. Tenaga
Pekerja L.01 Oh 0.300 150,000.00 45,000.00
Tukang batu L.02 Oh 0.150 175,000.00 26,250.00
Kepala tukang batu L.03 Oh 0.015 185,000.00 2,775.00
Mandor L.04 Oh 0.010 200,000.00 2,000.00
Jumlah harga tenaga kerja 76,025.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 104,250.60


E. OVERHEAD & PROFIT 15%XD 15,637.59
F. HARGA SATUAN PEKERJAAN ( D+E) 119,888.19

19 A.4.4.2.4 1 M2 PLESTERAN, 1PC : 4PSR, TEBAL 15 MM


A. Bahan
Semen PC Kg 6.240 1,900.00 11,856.00
Pasir pasang M3 0.024 440,000.00 10,560.00
Jumlah harga bahan 22,416.00
B. Tenaga
Pekerja L.01 Oh 0.300 150,000.00 45,000.00
Tukang batu L.02 Oh 0.150 175,000.00 26,250.00
Kepala tukang batu L.03 Oh 0.015 185,000.00 2,775.00
Mandor L.04 Oh 0.015 200,000.00 3,000.00
Jumlah harga tenaga kerja 77,025.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 99,441.00


E. OVERHEAD & PROFIT 15%XD 14,916.15
F. HARGA SATUAN PEKERJAAN ( D+E) 114,357.15

20 A.4.4.2.5 1 M2 PLESTERAN, 1PC : 5PSR, TEBAL 15 MM


A. Bahan
Semen PC Kg 5.184 1,900.00 9,849.60
Pasir pasang M3 0.026 440,000.00 11,440.00
Jumlah harga bahan 21,289.60
B. Tenaga
Pekerja L.01 Oh 0.300 150,000.00 45,000.00
Tukang batu L.02 Oh 0.150 175,000.00 26,250.00
Kepala tukang batu L.03 Oh 0.015 185,000.00 2,775.00
Mandor L.04 Oh 0.015 200,000.00 3,000.00
Jumlah harga tenaga kerja 77,025.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 98,314.60


E. OVERHEAD & PROFIT 15%XD 14,747.19
F. HARGA SATUAN PEKERJAAN ( D+E) 113,061.79
No. URAIAN PEKERJAAN KODE SATUAN KOIFISIEN HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )

21 A.4.4.2.3 1 M2 PLESTERAN BETON, 1PC : 3PSR, TEBAL 15 MM


A. Bahan
Semen PC Kg 7.776 1,900.00 14,774.40
Pasir pasang M3 0.023 440,000.00 10,120.00
Jumlah harga bahan 24,894.40
B. Tenaga
Pekerja L.01 Oh 1.000 150,000.00 150,000.00
Tukang batu L.02 Oh 1.000 175,000.00 175,000.00
Kepala tukang batu L.03 Oh 0.050 185,000.00 9,250.00
Mandor L.04 Oh 0.050 200,000.00 10,000.00
Jumlah harga tenaga kerja 344,250.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 369,144.40


E. OVERHEAD & PROFIT 15%XD 55,371.66
F. HARGA SATUAN PEKERJAAN ( D+E) 424,516.06

22 A.4.1.1.1 MEMBUAT 1 m3 BETON MUTU f’c = 7,4 MPa (K 100) LANTAI KERJA
A. Bahan
Semen PC Kg 218.000 1,900.00 414,200.00
Pasir beton M3 0.520 440,000.00 228,800.00
Koral beton M3 0.870 220,000.00 191,400.00
Jumlah harga bahan 834,400.00
B. Tenaga
Pekerja L.01 Oh 1.650 150,000.00 247,500.00
Tukang batu L.02 Oh 0.250 175,000.00 43,750.00
Kepala tukang batu L.03 Oh 0.025 185,000.00 4,625.00
Mandor L.04 Oh 0.080 200,000.00 16,000.00
Jumlah harga tenaga kerja 311,875.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 1,146,275.00


E. OVERHEAD & PROFIT 15%XD 171,941.25
F. HARGA SATUAN PEKERJAAN ( D+E) 1,318,216.25

23 A. A.4.1.1.5 MEMBUAT 1 m3 BETON MUTU f’c = 14.5 MPa (K 175)


A. BAHAN
Semen PC Kg 326.000 1,900.00 619,400.00
Pasir beton kg 760.000 314.29 238,857.14
Keiril (maks 30 mm) kg 1,029.000 146.67 150,920.00
Air Ltr 215.000 100.00 21,500.00
Jumlah harga bahan 1,030,677.14
B. TENAGA
Pekerja L.01 Oh 1.650 150,000.00 247,500.00
Tukang batu L.02 Oh 0.275 175,000.00 48,125.00
Kepala tukang batu L.03 Oh 0.028 185,000.00 5,180.00
Mandor L.04 Oh 0.083 200,000.00 16,600.00
Jumlah harga tenaga kerja 317,405.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 1,348,082.14


E. OVERHEAD & PROFIT 15%XD 202,212.32
F. HARGA SATUAN PEKERJAAN ( D+E) 1,550,294.46

24 A. A.4.1.1.5 MEMBUAT 1 m3 BETON MUTU f’c = 19.3 MPa (K 225)


A. Bahan
Semen PC Kg 371.000 1,900.00 704,900.00
Pasir beton kg 698.000 314.29 219,371.43
Kerikil kg 1,047.000 146.67 153,560.00
Air Ltr 215.000 100.00 21,500.00
Jumlah harga bahan 1,099,331.43
B. Tenaga
Pekerja L.01 Oh 1.650 150,000.00 247,500.00
Tukang batu L.02 Oh 0.275 175,000.00 48,125.00
Kepala tukang batu L.03 Oh 0.028 185,000.00 5,180.00
Mandor L.04 Oh 0.083 200,000.00 16,600.00
Jumlah harga tenaga kerja 317,405.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 1,416,736.43


E. OVERHEAD & PROFIT 15%XD 212,510.46
F. HARGA SATUAN PEKERJAAN ( D+E) 1,629,246.89
No. URAIAN PEKERJAAN KODE SATUAN KOIFISIEN HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )

25 A.4.1.1.17 PEMBESIAN 10 kg DENGAN BESI POLOS ATAU BESI ULIR


A. Bahan
Besi beton polos Kg 10.500 17,000.00 178,500.00
kawat beton Kg 0.150 24,000.00 3,600.00
Jumlah harga bahan 182,100.00
B. Tenaga
Pekerja L.01 Oh 0.0070 150,000.00 1,050.00
Tukang besi L.02 Oh 0.0070 175,000.00 1,225.00
Kepala tukang besi L.03 Oh 0.0007 185,000.00 129.50
Mandor L.04 Oh 0.0003 200,000.00 60.00
Jumlah harga tenaga kerja 2,464.50
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 184,564.50


E. OVERHEAD & PROFIT 15%XD 27,684.68
F. HARGA SATUAN PEKERJAAN ( D+E) 212,249.18

HARGA SATUAN PEKERJAAN UNTUK 1 KG 21,224.92

26 A. 4.4.1.20 1 M2 PASANG BEKISTING UNTUK PONDASI


A. Bahan
Kayu klas II M3 0.040 1,500,000.00 60,000.00
Paku usuk 2" - 5 " Kg 0.300 24,000.00 7,200.00
Minyak bakesting Ltr 0.100 20,000.00 2,000.00
Jumlah harga bahan 69,200.00
B. Tenaga
Pekerja L.01 Oh 0.520 150,000.00 78,000.00
Tukang kayu L.02 Oh 0.260 175,000.00 45,500.00
Kepala tukang kayu L.03 Oh 0.026 185,000.00 4,810.00
Mandor L.04 Oh 0.026 200,000.00 5,200.00
Jumlah harga tenaga kerja 133,510.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 202,710.00


E. OVERHEAD & PROFIT 15%XD 30,406.50
F. HARGA SATUAN PEKERJAAN ( D+E) 233,116.50

27 A.4.1.1.21 1 M2 PASANG BEKISTING UNTUK SLOOF


A. Bahan
Kayu klas II M3 0.045 1,500,000.00 67,500.00
Paku usuk 2" - 5 " Kg 0.300 24,000.00 7,200.00
Minyak bakesting Ltr 0.100 20,000.00 2,000.00
Jumlah harga bahan 76,700.00
B. Tenaga
Pekerja L.01 Oh 0.520 150,000.00 78,000.00
Tukang kayu L.02 Oh 0.260 175,000.00 45,500.00
Kepala tukang kayu L.03 Oh 0.026 185,000.00 4,810.00
Mandor L.04 Oh 0.026 200,000.00 5,200.00
Jumlah harga tenaga kerja 133,510.00
C. Peralatan
Jumlah harga peralatan

D. JUMLAH ( A+B+C) 210,210.00


E. OVERHEAD & PROFIT 15%XD 31,531.50
F. HARGA SATUAN PEKERJAAN ( D+E) 241,741.50
28 A.4.1.1.22 1 M2 PASANG BEKISTING UNTUK KOLOM
A. Bahan
Kayu Klas II 5/7 M3 0.040 1,500,000.00 60,000.00
Paku usuk 2" - 5 " Kg 0.400 24,000.00 9,600.00
Balok kayu Klas II M3 0.015 1,500,000.00 22,500.00
Multiplek tebal 9mm Lbr 0.350 150,000.00 52,500.00
Dolken kayu dia 8-10, panj maks 4 m Btg 2.000 4,000.00 8,000.00
Minyak bakesting Ltr 0.200 20,000.00 4,000.00
Jumlah harga bahan 156,600.00
B. Tenaga
Pekerja L.01 Oh 0.660 150,000.00 99,000.00
Tukang kayu L.02 Oh 0.330 175,000.00 57,750.00
Kepala tukang kayu L.03 Oh 0.033 185,000.00 6,105.00
Mandor L.04 Oh 0.033 200,000.00 6,600.00
Jumlah harga tenaga kerja 169,455.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 326,055.00


E. OVERHEAD & PROFIT 15%XD 48,908.25
F. HARGA SATUAN PEKERJAAN ( D+E) 374,963.25
No. URAIAN PEKERJAAN KODE SATUAN KOIFISIEN HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )

29 A.4.1.1.23 1 M2 PASANG BEKISTING UNTUK BALOK


A. Bahan
Kayu klas II 5/7 M3 0.040 1,500,000.00 60,000.00
Paku usuk 2" - 5 " Kg 0.400 24,000.00 9,600.00
Balok kayu Klas II M3 0.018 1,500,000.00 27,000.00
Multiplek tebal 9mm Lbr 0.350 150,000.00 52,500.00
Dolken kayu dia 8-10, panj maks 4 m Btg 2.000 4,000.00 8,000.00
Minyak bakesting Ltr 0.200 20,000.00 4,000.00
Jumlah harga bahan 161,100.00
B. Tenaga
Pekerja L.01 Oh 0.660 150,000.00 99,000.00
Tukang kayu L.02 Oh 0.330 175,000.00 57,750.00
Kepala tukang kayu L.03 Oh 0.033 185,000.00 6,105.00
Mandor L.04 Oh 0.006 200,000.00 1,200.00
Jumlah harga tenaga kerja 164,055.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 325,155.00


E. OVERHEAD & PROFIT 15%XD 48,773.25
F. HARGA SATUAN PEKERJAAN ( D+E) 373,928.25

30 A.4.1.1.24 1 M2 PASANG BEKISTING UNTUK LANTAI


A. Bahan
Kayu klas II 5/7 M3 0.040 1,500,000.00 60,000.00
Paku usuk 2" - 5 " Kg 0.400 24,000.00 9,600.00
Balok kayu Klas II M3 0.015 1,500,000.00 22,500.00
Multiplek tebal 9mm Lbr 0.350 150,000.00 52,500.00
Dolken kayu dia 8-10, panj maks 4 m Btg 6.000 4,000.00 24,000.00
Minyak bakesting Ltr 0.200 20,000.00 4,000.00
Jumlah harga bahan 172,600.00
B. Tenaga
Pekerja L.01 Oh 0.660 150,000.00 99,000.00
Tukang kayu L.02 Oh 0.330 175,000.00 57,750.00
Kepala tukang kayu L.03 Oh 0.033 185,000.00 6,105.00
Mandor L.04 Oh 0.033 200,000.00 6,600.00
Jumlah harga tenaga kerja 169,455.00
C. Peralatan
Jumlah harga peralatan

D. JUMLAH ( A+B+C) 342,055.00


E. OVERHEAD & PROFIT 15%XD 51,308.25
F. HARGA SATUAN PEKERJAAN ( D+E) 393,363.25

34 A.4.1.1.26 1 M2 PASANG BEKISTING UNTUK TANGGA


A. Bahan
Kayu klas II 5/7 M3 0.030 1,500,000.00 45,000.00
Paku usuk 2" - 5 " Kg 0.400 24,000.00 9,600.00
Balok kayu Klas II M3 0.015 1,500,000.00 22,500.00
Multiplek tebal 9mm Lbr 0.350 150,000.00 52,500.00
Dolken kayu dia 8-10, panj maks 4 m Btg 2.000 4,000.00 8,000.00
Minyak bakesting Ltr 0.150 20,000.00 3,000.00
Jumlah harga bahan 140,600.00
B. Tenaga
Pekerja L.01 Oh 0.660 150,000.00 99,000.00
Tukang kayu L.02 Oh 0.330 175,000.00 57,750.00
Kepala tukang kayu L.03 Oh 0.033 185,000.00 6,105.00
Mandor L.04 Oh 0.033 200,000.00 6,600.00
Jumlah harga tenaga kerja 169,455.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 310,055.00


E. OVERHEAD & PROFIT 15%XD 46,508.25
F. HARGA SATUAN PEKERJAAN ( D+E) 356,563.25

32 1 M3 BETON Beton KL 15 x 15
Besi beton kg 170.391 21,224.92 3,616,544.79
Spesi beton K.175 m3 1.000 1,550,294.46 1,550,294.46
Cetakan papan begesting m2 26.667 374,963.25 9,999,020.00
Jumlah 15,165,859.25

32 1 M3 BETON Beton KL 20 X 20
Besi beton kg 126.967 21,224.92 2,694,864.08
Spesi beton K.175 m3 1.000 1,550,294.46 1,550,294.46
Cetakan papan begesting m2 20.000 374,963.25 7,499,265.00
Jumlah 11,744,423.54
No. URAIAN PEKERJAAN KODE SATUAN KOIFISIEN HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )

33 1 M3 BETON Beton SL 15 X 20
Besi beton kg 136.562 21,224.92 2,898,508.40
Spesi beton K.175 m3 1.000 1,550,294.46 1,550,294.46
Cetakan / begesting m2 18.333 373,928.25 6,855,351.25
Jumlah 11,304,154.12

34 1 M3 BETON Beton RB 15 X 20
Besi beton kg 136.562 21,224.92 2,898,508.40
Spesi beton K.225 m3 1.000 1,550,294.46 1,550,294.46
Cetakan papan begesting m2 18.333 373,928.25 6,855,351.25
Jumlah 11,304,154.12

35 A.4.6.1.19 1 M2 PASANG RANGKA PLAFOND ( 50 X 100 ) cm, KAYU KLAS II


A. Bahan
Kayu klas II (5X7) M3 0.0154 1,500,000.00 23,100.00
Paku usuk 2" - 5 " Kg 0.200 24,000.00 4,800.00
Jumlah harga bahan 27,900.00
B. Tenaga
Pekerja L.01 Oh 0.150 150,000.00 22,500.00
Tukang kayu L.02 Oh 0.300 175,000.00 52,500.00
Kepala tukang kayu L.03 Oh 0.030 185,000.00 5,550.00
Mandor L.04 Oh 0.075 200,000.00 15,000.00
Jumlah harga tenaga kerja 95,550.00
C Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 123,450.00


E. OVERHEAD & PROFIT 15%XD 18,517.50
F. HARGA SATUAN PEKERJAAN ( D+E) 141,967.50

36 A.4.1.5.1 1 M2 PASANG PLAFOND TRIPLEKS (120x240) 3mm, 4mm & 6 mm


A. Bahan
Tripleks Lbr 0.375 85,000.00 31,875.00
Paku usuk 2" - 5 " Kg 0.030 24,000.00 720.00
Jumlah harga bahan 32,595.00
B. Tenaga
Pekerja L.01 Oh 0.100 150,000.00 15,000.00
Tukang kayu L.02 Oh 0.100 175,000.00 17,500.00
Kepala tukang kayu L.03 Oh 0.010 185,000.00 1,850.00
Mandor L.04 Oh 0.005 200,000.00 1,000.00
Jumlah harga tenaga kerja 35,350.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 67,945.00


E. OVERHEAD & PROFIT 15%XD 10,191.75
F. HARGA SATUAN PEKERJAAN ( D+E) 78,136.75

1 M2 JUMLAH PASANG RANGKA DAN LANGIT-LANGIT 220,104.25

37 A.4.4.3.36 1 M2 PASANG LANTAI KERAMIK 20CM X 20CM


A. Bahan
Keramik 20/20 Bh 26.500 2,264.15 60,000.00
Semen PC Kg 10.400 1,900.00 19,760.00
Pasir pasang M3 0.045 440,000.00 19,800.00
Semen warna Kg 1.620 1,500.00 2,430.00
Jumlah harga bahan 101,990.00
B. Tenaga
Pekerja L.01 Oh 1.000 150,000.00 150,000.00
Tukang batu L.02 Oh 1.000 175,000.00 175,000.00
Kepala tukang batu L.03 Oh 0.035 185,000.00 6,475.00
Mandor L.04 Oh 0.035 200,000.00 7,000.00
Jumlah harga tenaga kerja 338,475.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 440,465.00


E. OVERHEAD & PROFIT 15%XD 66,069.75
F. HARGA SATUAN PEKERJAAN ( D+E) 506,534.75
No. URAIAN PEKERJAAN KODE SATUAN KOIFISIEN HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )

38 A.4.4.3.34 1 M2 PASANG LANTAI KERAMIK 40CM X 40CM


A. Bahan
Keramik 40/40 Bh 6.630 9,049.77 60,000.00
Semen PC Kg 9.800 1,900.00 18,620.00
Pasir pasang M3 0.045 440,000.00 19,800.00
Semen warna Kg 1.300 1,500.00 1,950.00
Jumlah harga bahan 100,370.00
B. Tenaga
Pekerja L.01 Oh 1.000 150,000.00 150,000.00
Tukang batu L.02 Oh 1.000 175,000.00 175,000.00
Kepala tukang batu L.03 Oh 0.500 185,000.00 92,500.00
Mandor L.04 Oh 0.500 200,000.00 100,000.00
Jumlah harga tenaga kerja 517,500.00
C. Peralatan

Jumlah harga peralatan


D. JUMLAH ( A+B+C) 617,870.00
E. OVERHEAD & PROFIT 15%XD 92,680.50
F. HARGA SATUAN PEKERJAAN ( D+E) 710,550.50
39 A.4.4.3.29 1 M PASANG PLINT TERALUX MARMER 10 X 40
A. Bahan
Plint teralux marmer 10 x 40 M2 2.650 3,018.87 8,000.00
Semen PC Kg 1.140 1,900.00 2,166.00
Pasir pasang M3 0.003 440,000.00 1,408.00
Semen warna Kg 0.100 1,500.00 150.00
Jumlah harga bahan 11,724.00
B. Tenaga
Pekerja L.01 Oh 0.090 150,000.00 13,500.00
Tukang batu L.02 Oh 0.090 175,000.00 15,750.00
Kepala tukang batu L.03 Oh 0.009 185,000.00 1,665.00
Mandor L.04 Oh 0.005 200,000.00 900.00
Jumlah harga tenaga kerja 31,815.00
C. Peralatan
Jumlah harga peralatan

D. JUMLAH ( A+B+C) 43,539.00


E. OVERHEAD & PROFIT 15%XD 6,530.85
F. HARGA SATUAN PEKERJAAN ( D+E) 50,069.85

40 A.4.7.1.4 1 M2 PENGECATAN KAYU (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
A. Bahan
Cat meni Kg 0.200 47,000.00 9,400.00
Plamir Kg 0.150 23,000.00 3,450.00
Cat dasar 1 kali Kg 0.170 50,000.00 8,500.00
Kertas gosok lbr 0.200 10,000.00 2,000.00
Cat penutup 2 kali Kg 0.260 50,000.00 13,000.00
Pengencer Kg 0.030 20,000.00 600.00
Kuas Bh 0.010 17,000.00 170.00
Jumlah harga bahan 37,120.00
B. Tenaga
Pekerja L.01 Oh 0.070 150,000.00 10,500.00
Tukang cat L.02 Oh 0.009 175,000.00 1,575.00
Kepala tukang cat L.03 Oh 0.006 185,000.00 1,110.00
Mandor L.04 Oh 0.003 200,000.00 500.00
Jumlah harga tenaga kerja 13,685.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 50,805.00


E. OVERHEAD & PROFIT 15%XD 7,620.75
F. HARGA SATUAN PEKERJAAN ( D+E) 58,425.75

41 M2 PENGECATAN USUK DAN RENG


A. Bahan
Cat meni Kg 0.200 47,000.00 9,400.00
Jumlah harga bahan 9,400.00
B. Tenaga
Pekerja L.01 Oh 0.050 150,000.00 7,500.00
Tukang cat L.02 Oh 0.007 175,000.00 1,225.00
Kepala tukang cat L.03 Oh 0.004 185,000.00 740.00
Mandor L.04 Oh 0.002 200,000.00 300.00
Jumlah harga tenaga kerja 9,765.00
C. Peralatan
Jumlah harga peralatan

D. JUMLAH ( A+B+C) 19,165.00


E. OVERHEAD & PROFIT 15%XD 2,874.75
F. HARGA SATUAN PEKERJAAN ( D+E) 22,039.75
No. URAIAN PEKERJAAN KODE SATUAN KOIFISIEN HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )

42 A.4.7.1.10 1 M2 PENGECATAN DINDING (1 lapis plamuur, 1 cat dasar. 2 lapis cat penutup)
A. Bahan
Plamir Kg 0.100 23,000.00 2,300.00
Cat dasar 1 kali Kg 0.100 24,000.00 2,400.00
Cat penutup 2 kali Kg 0.260 24,000.00 6,240.00
Jumlah harga bahan 10,940.00
B. Tenaga
Pekerja L.01 Oh 0.0200 150,000.00 3,000.00
Tukang cat L.02 Oh 0.0630 175,000.00 11,025.00
Kepala tukang cat L.03 Oh 0.0063 185,000.00 1,165.50
Mandor L.04 Oh 0.0030 200,000.00 600.00
Jumlah harga tenaga kerja 15,790.50
C. Peralatan
Jumlah harga peralatan

D. JUMLAH ( A+B+C) 26,730.50


E. OVERHEAD & PROFIT 15%XD 4,009.58
F. HARGA SATUAN PEKERJAAN ( D+E) 30,740.08

43 A.4.7.1.16 1 M2 PENGECATAN MENI BESI


A. Bahan
Meni besi Kg 0.100 47,000.00 4,700.00
Kuas bh 0.010 17,000.00 170.00
Jumlah harga bahan 4,870.00
B. Tenaga
Pekerja Oh 0.0200 150,000.00 3,000.00
Tukang cat Oh 0.2000 175,000.00 35,000.00
Kepala tukang cat Oh 0.0200 185,000.00 3,700.00
Mandor Oh 0.0025 200,000.00 500.00
Jumlah harga tenaga kerja 42,200.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 47,070.00


E. OVERHEAD & PROFIT 15%XD 7,060.50
F. HARGA SATUAN PEKERJAAN ( D+E) 54,130.50
44 A.4.6.2.17 1 M2 PASANG KACA TEBAL = 3 MM
A. Bahan
Kaca tebal 3 mm M2 1.100 125,000.00 137,500.00
Jumlah harga bahan 137,500.00
B. Tenaga
Pekerja L.01 Oh 0.0150 150,000.00 2,250.00
Tukang kayu L.02 Oh 0.1500 175,000.00 26,250.00
Kepala tukang kayu L.03 Oh 0.0150 185,000.00 2,775.00
Mandor L.04 Oh 0.0008 200,000.00 150.00
Jumlah harga tenaga kerja 31,425.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 168,925.00


E. OVERHEAD & PROFIT 15%XD 25,338.75
F. HARGA SATUAN PEKERJAAN ( D+E) 194,263.75

45 A.5.1.1.1 1 BH PASANG KLOSED DUDUK/MONOBLOCK


A. Bahan
Klosed duduk Unit 1.000 2,500,000.00 2,500,000.00
Perlengkapan ( 6% harga klosed ) Ls 0.060 2,500,000.00 150,000.00
Jumlah harga bahan 2,650,000.00
B. Tenaga
Pekerja Oh 3.300 150,000.00 495,000.00
Tukang batu Oh 1.100 175,000.00 192,500.00
Kepala tukang batu Oh 0.010 185,000.00 1,850.00
Mandor Oh 0.160 200,000.00 32,000.00
Jumlah harga tenaga kerja 721,350.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 3,371,350.00


E. OVERHEAD & PROFIT 15%XD 505,702.50
F. HARGA SATUAN PEKERJAAN ( D+E) 3,877,052.50
No. URAIAN PEKERJAAN KODE SATUAN KOIFISIEN HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )

46 A.5.1.1.2 1 BH PASANG KLOSED JONGKOK


A. Bahan
Klosed jongkok Unit 1.000 350,000.00 350,000.00
Semen PC Kg 6.000 1,900.00 11,400.00
Pasir pasang M3 0.010 440,000.00 4,400.00
Jumlah harga bahan 365,800.00
B. Tenaga
Pekerja L.01 Oh 1.000 150,000.00 150,000.00
Tukang batu L.02 Oh 1.500 175,000.00 262,500.00
Kepala tukang batu L.03 Oh 0.150 185,000.00 27,750.00
Mandor L.04 Oh 0.160 200,000.00 32,000.00
Jumlah harga tenaga kerja 472,250.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 838,050.00


E. OVERHEAD & PROFIT 15%XD 125,707.50
F. HARGA SATUAN PEKERJAAN ( D+E) 963,757.50

47 A.5.1.1.4 1 BH PASANG URINOIR


A. Bahan
Urinoir Unit 1.000 1,150,000.00 1,150,000.00
Perlengkapan ( 30% harga urinor ) % 0.300 1,150,000.00 345,000.00
Semen PC Kg 6.000 1,900.00 11,400.00
Pasir pasang M3 0.010 440,000.00 4,400.00
Jumlah harga bahan 1,510,800.00
B. Tenaga
Pekerja L.01 Oh 1.000 150,000.00 150,000.00
Tukang batu L.02 Oh 1.000 175,000.00 175,000.00
Kepala tukang batu L.03 Oh 0.100 185,000.00 18,500.00
Mandor L.04 Oh 0.050 200,000.00 10,000.00
Jumlah harga tenaga kerja 353,500.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 1,864,300.00


E. OVERHEAD & PROFIT 15%XD 279,645.00
F. HARGA SATUAN PEKERJAAN ( D+E) 2,143,945.00
48 A.5.1.1.5 1 BH PASANG WASTAFEL
A. Bahan
Wastafel Unit 1.000 650,000.00 650,000.00
Perlengkapan ( 12% harga wastafel ) % 0.120 650,000.00 78,000.00
Semen PC Kg 6.000 1,900.00 11,400.00
Pasir pasang M3 0.010 440,000.00 4,400.00
Jumlah harga bahan 743,800.00
B. Tenaga
Pekerja L.01 Oh 1.200 150,000.00 180,000.00
Tukang batu L.02 Oh 1.450 175,000.00 253,750.00
Kepala tukang batu L.03 Oh 0.150 185,000.00 27,750.00
Mandor L.04 Oh 0.060 200,000.00 12,000.00
Jumlah harga tenaga kerja 473,500.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 1,217,300.00


E. OVERHEAD & PROFIT 15%XD 182,595.00
F. HARGA SATUAN PEKERJAAN ( D+E) 1,399,895.00

49 A.5.1.1.7 1 BH PASANG BAK MANDI FIBREGLAS VOLUME = 1 M3


A. Bahan
Bak fibreglass Bh 1.000 300,000.00 300,000.00
Perlengkapan ( 12% harga fibreglass ) % 0.120 36,000.00 4,320.00
Jumlah harga bahan 304,320.00
B. Tenaga
Pekerja Oh 0.300 150,000.00 45,000.00
Tukang batu Oh 0.450 175,000.00 78,750.00
Kepala tukang batu Oh 0.045 185,000.00 8,325.00
Mandor Oh 0.015 200,000.00 3,000.00
Jumlah harga tenaga kerja 135,075.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 439,395.00


E. OVERHEAD & PROFIT 15%XD 65,909.25
F. HARGA SATUAN PEKERJAAN ( D+E) 505,304.25
No. URAIAN PEKERJAAN KODE SATUAN KOIFISIEN HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )

50 A.4.6.1.1 1 M3 PASANG KUSEN PINTU JENDELA KAYU KLAS I


A. Bahan
Kayu klas I M3 1.100 3,500,000.00 3,850,000.00
Paku 10 cm Kg 1.250 24,000.00 30,000.00
Lem kayu Kg 1.000 15,000.00 15,000.00
Jumlah harga bahan 3,895,000.00
B. Tenaga
Pekerja L.01 Oh 12.000 150,000.00 1,800,000.00
Tukang kayu L.02 Oh 24.000 175,000.00 4,200,000.00
Kepala tukang kayu L.03 Oh 3.000 185,000.00 555,000.00
Mandor L.04 Oh 0.500 200,000.00 100,000.00
Jumlah harga tenaga kerja 6,655,000.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 10,550,000.00


E. OVERHEAD & PROFIT 15%XD 1,582,500.00
F. HARGA SATUAN PEKERJAAN ( D+E) 12,132,500.00

51 A.4.6.1.5 1 M2 PASANG PINTU PANEL KAYU KLAS I


A. Bahan
Kayu klas I papan M3 0.040 3,500,000.00 140,000.00
Lem kayu Kg 0.500 15,000.00 7,500.00
Jumlah harga bahan 147,500.00
B. Tenaga
Pekerja L.01 Oh 3.000 150,000.00 450,000.00
Tukang kayu L.02 Oh 3.000 175,000.00 525,000.00
Kepala tukang kayu L.03 Oh 2.000 185,000.00 370,000.00
Mandor L.04 Oh 1.000 200,000.00 200,000.00
Jumlah harga tenaga kerja 1,545,000.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 1,692,500.00


E. OVERHEAD & PROFIT 15%XD 253,875.00
F. HARGA SATUAN PEKERJAAN ( D+E) 1,946,375.00

52 A.4.6.1.8 1 M2 PASANG PINTU TRIPLEK RANGKA KAYU KLAS I


A. Bahan
Kayu papan kls I M3 0.0400 3,500,000.00 140,000.00
Paku biasa 1/2" - 1" Kg 0.0500 24,000.00 1,200.00
Lem kayu Lt 1.0000 15,000.00 15,000.00
Triplek (90x220) 3mm Lbr 1.0000 85,000.00 85,000.00
Jumlah harga bahan 241,200.00
B. Tenaga
Pekerja L.01 Oh 0.700 150,000.00 105,000.00
Tukang kayu L.02 Oh 2.100 175,000.00 367,500.00
Kepala tukang kayu L.03 Oh 0.210 185,000.00 38,850.00
Mandor L.04 Oh 0.035 200,000.00 7,000.00
Jumlah harga tenaga kerja 518,350.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 759,550.00


E. OVERHEAD & PROFIT 15%XD 113,932.50
F. HARGA SATUAN PEKERJAAN ( D+E) 873,482.50

53 A.4.6.1.16 1 M3 PASANG KUDA-KUDA KAYU KLAS II (Meranti)


A. Bahan
Kayu balok klas I M3 1.2000 1,500,000.00 1,800,000.00
Besi strip Kg 15.0000 20,000.00 300,000.00
Paku 12 cm Kg 5.6000 24,000.00 134,400.00
Jumlah harga bahan 2,234,400.00
B. Tenaga
Pekerja L.01 Oh 10.000 150,000.00 1,500,000.00
Tukang kayu L.02 Oh 24.000 175,000.00 4,200,000.00
Kepala tukang kayu L.03 Oh 2.010 185,000.00 371,850.00
Mandor L.04 Oh 1.000 200,000.00 200,000.00
Jumlah harga tenaga kerja 6,271,850.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 8,506,250.00


E. OVERHEAD & PROFIT 15%XD 1,275,937.50
F. HARGA SATUAN PEKERJAAN ( D+E) 9,782,187.50
No. URAIAN PEKERJAAN KODE SATUAN KOIFISIEN HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )

54 A.4.6.1.15 1 M3 PASANG GORDING KAYU KLS 2


A. Bahan
Kayu Kls 2 M3 1.100 1,500,000.00 1,650,000.00
Besi strip Kg 15.000 20,000.00 300,000.00
Paku 12 cm Kg 3.000 24,000.00 72,000.00
Jumlah harga bahan 2,022,000.00
B. Tenaga
Pekerja L.01 Oh 10.000 150,000.00 1,500,000.00
Tukang kayu L.02 Oh 24.000 175,000.00 4,200,000.00
Kepala tukang kayu L.03 Oh 2.010 185,000.00 371,850.00
Mandor L.04 Oh 1.000 200,000.00 200,000.00
Jumlah harga tenaga kerja 6,271,850.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 8,293,850.00


E. OVERHEAD & PROFIT 15%XD 1,244,077.50
F. HARGA SATUAN PEKERJAAN ( D+E) 9,537,927.50

55 A.4.6.1.17 .1 M2 PASANG USUK DAN RENG KAYU KLS 2


A. Bahan
Usuk 5 x 7 cm M3 0.014 1,500,000.00 21,000.00
Renk 3 x 2 cm M3 0.023 1,500,000.00 34,500.00
Paku 5 - 10 cm Kg 0.250 24,000.00 6,000.00
Jumlah harga bahan 61,500.00
B. Tenaga
Pekerja L.01 Oh 0.100 150,000.00 15,000.00
Tukang kayu L.02 Oh 0.100 175,000.00 17,500.00
Kepala tukang kayu L.03 Oh 0.010 185,000.00 1,850.00
Mandor L.04 Oh 0.005 200,000.00 1,000.00
Jumlah harga tenaga kerja 35,350.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 96,850.00


E. OVERHEAD & PROFIT 15%XD 14,527.50
F. HARGA SATUAN PEKERJAAN ( D+E) 111,377.50
56 1 M PASANG BUMBUNGAN DAN JURAI
A. Bahan
Kayu Kls 2 M3 0.005 1,500,000.00 7,500.00
Paku Kg 0.100 24,000.00 2,400.00
Jumlah harga bahan 9,900.00
B. Tenaga
Pekerja Oh 0.070 150,000.00 10,500.00
Tukang kayu L.01 Oh 0.200 175,000.00 35,000.00
Kepala tukang kayu L.02 Oh 0.020 185,000.00 3,700.00
Mandor L.03 Oh 0.004 200,000.00 800.00
L.04 Jumlah harga tenaga kerja 50,000.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 59,900.00


E. OVERHEAD & PROFIT 15%XD 8,985.00
F. HARGA SATUAN PEKERJAAN ( D+E) 68,885.00

57 A.4.6.6.22 1 M' PASANG LISPLANK 3/30 CM


A. Bahan
Kayu klas I papan 3/30 cm M3 0.011 1,500,000.00 16,500.00
Paku biasa 7" - 5" Kg 0.050 24,000.00 1,200.00
Jumlah harga bahan 17,700.00
B. Tenaga
Pekerja L.01 Oh 2.000 150,000.00 300,000.00
Tukang kayu L.02 Oh 1.000 175,000.00 175,000.00
Kepala tukang kayu L.03 Oh 0.500 185,000.00 92,500.00
Mandor L.04 Oh 0.005 200,000.00 1,000.00
Jumlah harga tenaga kerja 568,500.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 586,200.00


E. OVERHEAD & PROFIT 15%XD 87,930.00
F. HARGA SATUAN PEKERJAAN ( D+E) 674,130.00
No. URAIAN PEKERJAAN KODE SATUAN KOIFISIEN HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )

58 A.5.1.1.18 1 M' PIPA GALVANIS DIA 1/2"


A. Bahan
Pipa galvanis m' 1.200 50,000.00 60,000.00
Perlengkapan (30%) % 0.350 50,000.00 17,500.00
Jumlah harga bahan 77,500.00
B. Tenaga
Pekerja L.01 Oh 0.054 150,000.00 8,100.00
Tukang batu L.02 Oh 0.090 175,000.00 15,750.00
Kepala tukang batu L.03 Oh 0.009 185,000.00 1,665.00
Mandor L.04 Oh 0.027 200,000.00 5,400.00
Jumlah harga tenaga kerja 30,915.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 108,415.00


E. OVERHEAD & PROFIT 15%XD 16,262.25
F. HARGA SATUAN PEKERJAAN ( D+E) 124,677.25

59 15.18 1 M2 WATER PROOFING


B. Tenaga
Bonding Agen Kg 0.100 51,875.00 5,187.50
Sluriye M3 0.600 6,250.00 3,750.00
Polysint M3 0.700 53,125.00 37,187.50
Jumlah harga bahan 46,125.00
B Tenaga
Pekerja L.01 Oh 0.020 150,000.00 3,000.00
Tukang batu L.02 Oh 0.100 175,000.00 17,500.00
Kepala tukang batu L.03 Oh 0.010 185,000.00 1,850.00
Mandor L.04 Oh 0.030 200,000.00 6,000.00
Jumlah harga tenaga kerja 28,350.00
C. Peralatan
Jumlah harga peralatan
D. JUMLAH ( A+B+C) 74,475.00
E. OVERHEAD & PROFIT 15%XD 11,171.25
F. HARGA SATUAN PEKERJAAN ( D+E) 85,646.25
60 1 M' BENANGAN
A. Bahan
Semen PC zak 0.020 95,000.00 1,900.00
Alat bantu M3 1.000 1,500.00 1,500.00
Jumlah harga bahan 3,400.00
B. Tenaga
Pekerja L.01 Oh 0.015 150,000.00 2,250.00
Tukang batu L.02 Oh 0.080 175,000.00 14,000.00
Mandor L.04 Oh 0.030 200,000.00 6,000.00
Jumlah harga tenaga kerja 22,250.00
C. Peralatan
Jumlah harga peralatan
D. JUMLAH ( A+B+C) 23,750.00
E. OVERHEAD & PROFIT 15%XD 3,562.50
F. HARGA SATUAN PEKERJAAN ( D+E) 27,312.50

61 A.4.4.6.31 1 M2 FLOOR HARDERNER


A. Bahan
Floor harderner kg 5.000 10,000.00 50,000.00
Jumlah harga bahan 50,000.00
B. Tenaga
Pekerja L.01 Oh 0.120 150,000.00 18,000.00
Tukang batu L.02 Oh 0.120 175,000.00 21,000.00
Kepala tukang batu L.03 Oh 0.012 185,000.00 2,220.00
Mandor L.04 Oh 0.006 200,000.00 1,200.00
Jumlah harga tenaga kerja 42,420.00
C. Peralatan
Jumlah harga peralatan
D. JUMLAH ( A+B+C) 92,420.00
E. OVERHEAD & PROFIT 15%XD 13,863.00
F. HARGA SATUAN PEKERJAAN ( D+E) 106,283.00
62 I UNIT PENANGKAL PETIR
A. Bahan
Sock 3/4" bh 1.000 6,500.00 6,500.00
Pipa air 3/8" m' 1.500 40,000.00 60,000.00
Split 3/8" bh 1.000 50,000.00 50,000.00
Klem bh 30.000 5,000.00 150,000.00
Jumlah harga bahan 266,500.00
B. Tenaga
Ongkos kerja ls 1.000 500,000.00 500,000.00
Jumlah harga tenaga kerja 500,000.00
C. Peralatan
Jumlah harga peralatan
D. JUMLAH ( A+B+C) 766,500.00
E. OVERHEAD & PROFIT 15%XD 114,975.00
F. HARGA SATUAN PEKERJAAN ( D+E) 881,475.00
No. URAIAN PEKERJAAN KODE SATUAN KOIFISIEN HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )

63 1 M2 PASANG KACA POLOS TEBAL 3 MM


A. Bahan
Kaca polos m2 1.100 125,000.00 137,500.00
Jumlah harga bahan 137,500.00
B. Tenaga
Pekerja L.01 Oh 0.015 150,000.00 2,250.00
Tukang kayu L.02 Oh 0.150 175,000.00 26,250.00
Kepala tukang L.03 Oh 0.015 185,000.00 2,775.00
Mandor L.04 Oh 0.00075 200,000.00 150.00
Jumlah harga tenaga kerja 31,425.00
C. Peralatan
Jumlah harga peralatan

D. JUMLAH ( A+B+C) 168,925.00


E. OVERHEAD & PROFIT 15%XD 25,338.75
F. HARGA SATUAN PEKERJAAN ( D+E) 194,263.75

64 PASANG LAMPU PIJAR PHILIPS 18 WATT


A. Bahan
Fitting tempel bh 1.000 65,000.00 65,000.00
Lampu ijar philips 18 bh 1.000 40,000.00 40,000.00
Jumlah harga bahan 105,000.00
B. Tenaga
Ongkos kerja ls 1.000 25,000.00 25,000.00
Jumlah harga tenaga kerja 25,000.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 130,000.00


E. OVERHEAD & PROFIT 15%XD 19,500.00
F. HARGA SATUAN PEKERJAAN ( D+E) 149,500.00

65 PASANG LAMPU PIJAR PHILIPS 11 WATT


A. Bahan
Fitting tempel bh 1.000 65,000.00 65,000.00
Lampu ijar philips 11 bh 1.000 27,000.00 27,000.00
Jumlah harga bahan 92,000.00
B. Tenaga
Ongkos kerja ls 1.000 25,000.00 25,000.00
Jumlah harga tenaga kerja 25,000.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 117,000.00


E. OVERHEAD & PROFIT 15%XD 17,550.00
F. HARGA SATUAN PEKERJAAN ( D+E) 134,550.00

66 PASANG LAMPU PIJAR PHILIPS 23 WATT


A. Bahan
Fitting tempel bh 1.000 65,000.00 65,000.00
Lampu ijar philips 23 watt bh 1.000 45,000.00 45,000.00
Jumlah harga bahan 110,000.00
B. Tenaga
Ongkos kerja ls 1.000 25,000.00 25,000.00
Jumlah harga tenaga kerja 25,000.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 135,000.00


E. OVERHEAD & PROFIT 15%XD 20,250.00
F. HARGA SATUAN PEKERJAAN ( D+E) 155,250.00

67 PASANG STOP KONTAK


A. Bahan
Stop kontak bh 1.000 121,094.59 121,094.59
Jumlah harga bahan 121,094.59
B. Tenaga
Ongkos kerja ls 1.000 25,000.00 25,000.00
Jumlah harga tenaga kerja 25,000.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 146,094.59


E. OVERHEAD & PROFIT 15%XD 21,914.19
F. HARGA SATUAN PEKERJAAN ( D+E) 168,008.78
No. URAIAN PEKERJAAN KODE SATUAN KOIFISIEN HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )

68 PASANG SAKLAR TUNGGAL


A. Bahan
Saklar tunggal bh 1.000 102,119.59 102,119.59
Jumlah harga bahan 102,119.59
B. Tenaga
Ongkos kerja ls 1.000 25,000.00 25,000.00
Jumlah harga tenaga kerja 25,000.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 127,119.59


E. OVERHEAD & PROFIT 15%XD 19,067.94
F. HARGA SATUAN PEKERJAAN ( D+E) 146,187.53
69 PASANG SAKLAR GANDA
A. Bahan
Saklar ganda bh 1.000 102,119.59 102,119.59
Jumlah harga bahan 102,119.59
B. Tenaga
Ongkos kerja ls 1.000 25,000.00 25,000.00
Jumlah harga tenaga kerja 25,000.00
C. Peralatan

Jumlah harga peralatan


D. JUMLAH ( A+B+C) 127,119.59
E. OVERHEAD & PROFIT 15%XD 19,067.94
F. HARGA SATUAN PEKERJAAN ( D+E) 146,187.53

70 1 TITIK INSTALASI PENERANGAN DAN STOP KONTAK


A. Bahan
Kabel NYY m' 8.000 17,000.00 136,000.00
Pipa PVC 3/8'' ljr 1.000 7,500.00 7,500.00
Lasdop bh 6.000 2,000.00 12,000.00
Benang roll 0.200 1,500.00 300.00
Tdooz bh 1.000 5,000.00 5,000.00
Isolasi bh 2.000 20,000.00 40,000.00
Paku kg 0.300 24,000.00 7,200.00
Jumlah harga bahan 208,000.00
B. Tenaga
Ongkos kerja ls 1.000 25,000.00 25,000.00
Jumlah harga tenaga kerja 25,000.00
C. Peralatan

Jumlah harga peralatan


D. JUMLAH ( A+B+C) 233,000.00
E. OVERHEAD & PROFIT 15%XD 34,950.00
F. HARGA SATUAN PEKERJAAN ( D+E) 267,950.00

71 A.5.1.1.19 1 BH KRAN 3/4" ATAU 1/2"


A. Bahan
Kran air bh 1.000 17,500.00 17,500.00
Seal tape bh 0.025 1,500.00 37.50
Jumlah harga bahan 17,537.50
B. Tenaga
Pekerja L.01 Oh 0.010 150,000.00 1,500.00
Tukang batu L.02 Oh 0.400 175,000.00 70,000.00
Kepala tukang batu L.03 Oh 0.040 185,000.00 7,400.00
Mandor L.04 Oh 0.005 200,000.00 1,000.00
Jumlah harga tenaga kerja 79,900.00
C. Peralatan

Jumlah harga peralatan


D. JUMLAH ( A+B+C) 97,437.50
E. OVERHEAD & PROFIT 15%XD 14,615.63
F. HARGA SATUAN PEKERJAAN ( D+E) 112,053.13

72 A.5.1.1.14 1 BH FLOOR DRAIN


A. Bahan
Floor drain Unit 1.000 25,000.00 25,000.00
Jumlah harga bahan 25,000.00
B. Tenaga
Pekerja Oh 0.010 150,000.00 1,500.00
Tukang batu Oh 0.100 175,000.00 17,500.00
Kepala tukang batu Oh 0.010 185,000.00 1,850.00
Mandor Oh 0.005 200,000.00 1,000.00
Jumlah harga tenaga kerja 21,850.00
C. Peralatan

Jumlah harga peralatan


D. JUMLAH ( A+B+C) 46,850.00
E. OVERHEAD & PROFIT 15%XD 7,027.50
F. HARGA SATUAN PEKERJAAN ( D+E) 53,877.50
No. URAIAN PEKERJAAN KODE SATUAN KOIFISIEN HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )

73 A.4.6.2.1 PASANG 1 BH KUNCI GANDA TANAM ex SOLID


A. Bahan
Kunci tanam antik bh 1.000 400,000.00 400,000.00
Jumlah harga bahan 400,000.00
B. Tenaga
Pekerja L.01 Oh 0.060 150,000.00 9,000.00
Tukang kayu L.02 Oh 0.600 175,000.00 105,000.00
Kepala tukang kayu L.03 Oh 0.060 185,000.00 11,100.00
Mandor L.04 Oh 0.003 200,000.00 600.00
Jumlah harga tenaga kerja 125,700.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 525,700.00


E. OVERHEAD & PROFIT 15%XD 78,855.00
F. HARGA SATUAN PEKERJAAN ( D+E) 604,555.00

74 A.4.6.2.2 PASANG 1 BH KUNCI TANAM


A. Bahan
Kunci tanam bh 1.000 125,000.00 125,000.00
Jumlah harga bahan 125,000.00
B. Tenaga
Pekerja L.01 Oh 0.010 150,000.00 1,500.00
Tukang kayu L.02 Oh 0.500 175,000.00 87,500.00
Kepala tukang kayu L.03 Oh 0.050 185,000.00 9,250.00
Mandor L.04 Oh 0.005 200,000.00 1,000.00
Jumlah harga tenaga kerja 99,250.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 224,250.00


E. OVERHEAD & PROFIT 15%XD 33,637.50
F. HARGA SATUAN PEKERJAAN ( D+E) 257,887.50

75 A.4.6.2.3 PASANG 1 BH KUNCI TANAM KAMAR MANDI


A. Bahan
Kunci tanam KM bh 1.000 100,000.00 100,000.00
Jumlah harga bahan 100,000.00
B. Tenaga
Pekerja L.01 Oh 0.005 150,000.00 750.00
Tukang kayu L.02 Oh 0.500 175,000.00 87,500.00
Kepala tukang kayu L.03 Oh 0.050 185,000.00 9,250.00
Mandor L.04 Oh 0.003 200,000.00 600.00
Jumlah harga tenaga kerja 98,100.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 198,100.00


E. OVERHEAD & PROFIT 15%XD 29,715.00
F. HARGA SATUAN PEKERJAAN ( D+E) 227,815.00

76 A.4.6.2.4 PASANG 1 BH KUNCI SILINDER


A. Bahan
Kunci silinder bh 1.000 400,000.00 400,000.00
Jumlah harga bahan 400,000.00
B. Tenaga
Pekerja L.01 Oh 0.005 150,000.00 750.00
Tukang kayu L.02 Oh 0.500 175,000.00 87,500.00
Kepala tukang kayu L.03 Oh 0.050 185,000.00 9,250.00
Mandor L.04 Oh 0.003 200,000.00 600.00
Jumlah harga tenaga kerja 98,100.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 498,100.00


E. OVERHEAD & PROFIT 15%XD 74,715.00
F. HARGA SATUAN PEKERJAAN ( D+E) 572,815.00
No. URAIAN PEKERJAAN KODE SATUAN KOIFISIEN HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )

77 A.4.6.2.5 PASANG 1 BH ENGSEL PINTU


A. Bahan
Engsel pintu bh 1.000 22,000.00 22,000.00
Jumlah harga bahan 22,000.00
B. Tenaga
Pekerja L.01 Oh 0.300 150,000.00 45,000.00
Tukang kayu L.02 Oh 0.200 175,000.00 35,000.00
Kepala tukang kayu L.03 Oh 0.050 185,000.00 9,250.00
Mandor L.04 Oh 0.0008 200,000.00 150.00
Jumlah harga tenaga kerja 89,400.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 111,400.00


E. OVERHEAD & PROFIT 15%XD 16,710.00
F. HARGA SATUAN PEKERJAAN ( D+E) 128,110.00

78 A.4.6.2.6 PASANG 1 BH ENGSEL JENDELA


A. Bahan
Engsel jendela bh 1.000 20,000.00 20,000.00
Jumlah harga bahan 20,000.00
B. Tenaga
Pekerja L.01 Oh 0.050 150,000.00 7,500.00
Tukang kayu L.02 Oh 0.300 175,000.00 52,500.00
Kepala tukang kayu L.03 Oh 0.030 185,000.00 5,550.00
Mandor L.04 Oh 0.0005 200,000.00 100.00
Jumlah harga tenaga kerja 65,650.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 85,650.00


E. OVERHEAD & PROFIT 15%XD 12,847.50
F. HARGA SATUAN PEKERJAAN ( D+E) 98,497.50

79 A.4.6.2.7 PASANG GRENDEL JENDELA


A. Bahan
Grendel jendela bh 1.000 18,000.00 18,000.00
Jumlah harga bahan 18,000.00
B. Tenaga
Pekerja L.01 Oh 0.100 150,000.00 15,000.00
Tukang kayu L.02 Oh 0.200 175,000.00 35,000.00
Kepala tukang kayu L.03 Oh 0.020 185,000.00 3,700.00
Mandor L.04 Oh 0.0005 200,000.00 100.00
Jumlah harga tenaga kerja 53,800.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 71,800.00


E. OVERHEAD & PROFIT 15%XD 10,770.00
F. HARGA SATUAN PEKERJAAN ( D+E) 82,570.00

80 A.4.6.2.9 PASANG 1 BH KAIT ANGIN


A. Bahan
Engsel hak angin bh 1.000 18,000.00 18,000.00
Jumlah harga bahan 18,000.00
B. Tenaga
Pekerja L.01 Oh 0.020 150,000.00 3,000.00
Tukang kayu L.02 Oh 0.300 175,000.00 52,500.00
Kepala tukang kayu L.03 Oh 0.030 185,000.00 5,550.00
Mandor L.04 Oh 0.0080 200,000.00 1,600.00
Jumlah harga tenaga kerja 62,650.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 80,650.00


E. OVERHEAD & PROFIT 15%XD 12,097.50
F. HARGA SATUAN PEKERJAAN ( D+E) 92,747.50
No. URAIAN PEKERJAAN KODE SATUAN KOIFISIEN HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )

81 A.4.6.2.10 PASANG 1 BH DOOR CLOSER


A. Bahan
Door Closer bh 1.000 350,000.00 350,000.00
Jumlah harga bahan 350,000.00
B. Tenaga
Pekerja L.01 Oh 0.050 150,000.00 7,500.00
Tukang kayu L.02 Oh 0.500 175,000.00 87,500.00
Kepala tukang kayu L.03 Oh 0.050 185,000.00 9,250.00
Mandor L.04 Oh 0.003 200,000.00 500.00
Jumlah harga tenaga kerja 104,750.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 454,750.00


E. OVERHEAD & PROFIT 15%XD 68,212.50
F. HARGA SATUAN PEKERJAAN ( D+E) 522,962.50

82 A.4.5.2.38. 1M2 PASANG ATAP SENG GELOMBANG


A. Bahan
Seng gel 3"x6" lbr 0.700 80,000.00 56,000.00
paku Biasa 2-5 Kg 0.020 24,000.00 480.00
Jumlah harga bahan 56,480.00
B. Tenaga
Pekerja L.01 Oh 0.1200 150,000.00 18,000.00
Tukang kayu L.02 Oh 0.0600 175,000.00 10,500.00
Kepala tukang L.03 Oh 0.0060 185,000.00 1,110.00
Mandor L.04 Oh 0.0060 200,000.00 1,200.00
Jumlah harga tenaga kerja 30,810.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 87,290.00


E. OVERHEAD & PROFIT 15%XD 13,093.50
F. HARGA SATUAN PEKERJAAN ( D+E) 100,383.50

83 A.4.5.2.39. 1M PASANG NOK ATAP SENG


A. Bahan
Seng plat 3"x6"bjls 25 lbr 0.300 50,000.00 15,000.00
paku Biasa 1/2 -1 Kg 0.040 24,000.00 960.00
Jumlah harga bahan 15,960.00
B. Tenaga
Pekerja L.01 Oh 0.1500 150,000.00 22,500.00
Tukang kayu L.02 Oh 0.0700 175,000.00 12,250.00
Kepala tukang L.03 Oh 0.0070 185,000.00 1,295.00
Mandor L.04 Oh 0.0060 200,000.00 1,200.00
Jumlah harga tenaga kerja 37,245.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 53,205.00


E. OVERHEAD & PROFIT 15%XD 7,980.75
F. HARGA SATUAN PEKERJAAN ( D+E) 61,185.75

84 A.4.4.2.23. 1M2 PLESTERAN CIPRAT


A. Bahan
Semen Portland kg 4.320 1,900.00 8,208.00
Pasir M3 0.006 440,000.00 2,640.00
Jumlah harga bahan 10,848.00
B. Tenaga
Pekerja L.01 Oh 0.3000 150,000.00 45,000.00
Tukang kayu L.02 Oh 0.1000 175,000.00 17,500.00
Kepala tukang L.03 Oh 0.0100 185,000.00 1,850.00
Mandor L.04 Oh 0.0150 200,000.00 3,000.00
Jumlah harga tenaga kerja 67,350.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 78,198.00


E. OVERHEAD & PROFIT 15%XD 11,729.70
F. HARGA SATUAN PEKERJAAN ( D+E) 89,927.70
No. URAIAN PEKERJAAN KODE SATUAN KOIFISIEN HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )

85 A.4.6.1.6. 1M2 PASANG PINTU DAN JENDELA KACA KAYU KLS 1


A. Bahan
Kayu Kls 1 m3 0.024 3,500,000.00 84,000.00
Kaca 3mm m2 0.300 125,000.00 37,500.00
Sealant kg 0.050 5,000.00 250.00
Jumlah harga bahan 121,750.00
B. Tenaga
Pekerja L.01 Oh 2.0000 150,000.00 300,000.00
Tukang kayu L.02 Oh 2.5000 175,000.00 437,500.00
Kepala tukang L.03 Oh 0.5000 185,000.00 92,500.00
Mandor L.04 Oh 0.5000 200,000.00 100,000.00
Jumlah harga tenaga kerja 930,000.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 1,051,750.00


E. OVERHEAD & PROFIT 15%XD 157,762.50
F. HARGA SATUAN PEKERJAAN ( D+E) 1,209,512.50

86 A.4.6.1.7. 1M2 PASANG PINTU DAN JENDELA JALUSI KAYU KLS I


A. Bahan
Kayu papan kls 1 m3 0.064 1,500,000.00 96,000.00
Lem kayu kg 0.500 15,000.00 7,500.00
Jumlah harga bahan 103,500.00
B. Tenaga
Pekerja L.01 Oh 1.0000 150,000.00 150,000.00
Tukang kayu L.02 Oh 3.0000 175,000.00 525,000.00
Kepala tukang L.03 Oh 0.3000 185,000.00 55,500.00
Mandor L.04 Oh 0.0500 200,000.00 10,000.00
Jumlah harga tenaga kerja 740,500.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 844,000.00


E. OVERHEAD & PROFIT 15%XD 126,600.00
F. HARGA SATUAN PEKERJAAN ( D+E) 970,600.00

87 1M' PEKERJAAN SALURAN KELILING BANGUNAN


A. Bahan
Galian Tanah M3 0.2000 135,125.00 27,025.00
Pas. Batu Bata Camp. 1 : 5 M3 0.1200 1,383,958.33 166,075.00
Urugan Pasir dibawah rabat saluran M3 0.0500 586,730.00 29,336.50
Rabat Beton 1 : 3 : 5 M2 0.0500 114,627.50 5,731.38
Pelesteran camp. 1 : 3 M2 0.8000 424,516.06 339,612.85
Jumlah harga bahan 567,780.72
B. Peralatan

Jumlah harga peralatan

C. JUMLAH ( A+B) 567,780.72

88 1M2 PENGECATAN PLAFOND TRIPLEK ( 1 lapis plamir, 1 cat dasar dan 2 lapis cat penutup )
A. Bahan
Cat Meni kg 0.000 47,000.00 -
Plamir kg 0.000 23,000.00 -
Cat dasar kg 0.170 47,000.00 7,990.00
Cat penutup kg 0.260 24,000.00 6,240.00
Jumlah harga bahan 14,230.00
B. Tenaga
Pekerja L.01 Oh 0.0700 150,000.00 10,500.00
Tukang kayu L.02 Oh 0.0900 175,000.00 15,750.00
Kepala tukang L.03 Oh 0.0060 185,000.00 1,110.00
Mandor L.04 Oh 0.0025 200,000.00 500.00
Jumlah harga tenaga kerja 27,860.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 42,090.00


E. OVERHEAD & PROFIT 15%XD 6,313.50
F. HARGA SATUAN PEKERJAAN ( D+E) 48,403.50
No. URAIAN PEKERJAAN KODE SATUAN KOIFISIEN HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )

89 1M2 PASANG PAVING BLOK


A. Bahan
Paving Blok bh 36.000 5,000.00 180,000.00
Jumlah harga bahan 180,000.00
B. Tenaga
Pekerja L.01 Oh 0.3910 150,000.00 58,650.00
Tukang kayu L.02 Oh 0.1950 175,000.00 34,125.00
Kepala tukang L.03 Oh 0.0200 185,000.00 3,700.00
Mandor L.04 Oh 0.0391 200,000.00 7,820.00
Jumlah harga tenaga kerja 104,295.00
C. Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 284,295.00


E. OVERHEAD & PROFIT 15%XD 42,644.25
F. HARGA SATUAN PEKERJAAN ( D+E) 326,939.25

90 A.4.2.1.21. 1 M2 PASANG RANGKA PLAFOND BESI HOLLOW, ( 60 X 60 ) cm


A. Bahan
Rangka metal hollow 40.40.2 mm M' 4.000 27,000.00 108,000.00
Asesoris (perkuatan, las dll) Ls 1.000 27,000.00 27,000.00
Jumlah harga bahan 135,000.00
B. Tenaga
Pekerja L.01 Oh 0.350 150,000.00 52,500.00
Tukang kayu L.02 Oh 0.350 175,000.00 61,250.00
Kepala tukang kayu L.03 Oh 0.035 185,000.00 6,475.00
Mandor L.04 Oh 0.018 200,000.00 3,500.00
Jumlah harga tenaga kerja 123,725.00
C Peralatan

Jumlah harga peralatan

D. JUMLAH ( A+B+C) 258,725.00


E. OVERHEAD & PROFIT 15%XD 38,808.75
F. HARGA SATUAN PEKERJAAN ( D+E) 297,533.75

91 A.4.5.1.7. 1 M2 PASANG PLAFOND GIBSUM BOARD (120x240x9), TEBAL 9 mm


A. Bahan
Gibsum board 9 mm Lbr 0.364 127,500.00 46,410.00
Mur gipsum board Kg 0.110 23,000.00 2,530.00
Jumlah harga bahan 48,940.00
B. Tenaga
Pekerja L.01 Oh 0.500 150,000.00 75,000.00
Tukang kayu L.02 Oh 0.500 175,000.00 87,500.00
Kepala tukang kayu L.03 Oh 0.005 185,000.00 925.00
Mandor L.04 Oh 0.005 200,000.00 1,000.00
Jumlah harga tenaga kerja 164,425.00
C. Peralatan
Jumlah harga peralatan

D. JUMLAH ( A+B+C) 213,365.00


E. OVERHEAD & PROFIT 15%XD 32,004.75
F. HARGA SATUAN PEKERJAAN ( D+E) 245,369.75

1 M2 JUMLAH PASANG RANGKA DAN LANGIT-LANGIT 542,903.50

92 1 M2 PASANG VENTILASI KAYU DISERUT


A. Bahan
Kayu klas I M3 0.022 3,500,000.00 77,000.00
Jumlah harga bahan 77,000.00
B. Tenaga
Tukang kayu L.01 Oh 2.000 150,000.00 300,000.00
Kepala tukang kayu L.03 Oh 1.000 185,000.00 185,000.00
Mandor L.04 Oh 1.000 200,000.00 200,000.00
Jumlah harga tenaga kerja 685,000.00
C. Peralatan
Jumlah harga peralatan

D. JUMLAH ( A+B+C) 762,000.00


E. OVERHEAD & PROFIT 15%XD 114,300.00
F. HARGA SATUAN PEKERJAAN ( D+E) 876,300.00
No. URAIAN PEKERJAAN KODE SATUAN KOIFISIEN HARGA SATUAN ( Rp. ) JUMLAH HARGA ( Rp. )

93 1 M2 PASANG BATU ANDESIT DINDING


A. Bahan
Batu candi M2 1.000 350,000.00 350,000.00
Semen PC Kg 11.380 1,900.00 21,622.00
Pasir pasang M3 0.042 440,000.00 18,480.00
Jumlah harga bahan 390,102.00
B. Tenaga
Pekerja L.01 Oh 0.620 150,000.00 93,000.00
Tukang batu L.02 Oh 0.350 175,000.00 61,250.00
Kepala tukang batu L.03 Oh 0.035 185,000.00 6,475.00
Mandor L.04 Oh 0.030 200,000.00 6,000.00
Jumlah harga tenaga kerja 166,725.00
C. Peralatan
Jumlah harga peralatan

D. JUMLAH ( A+B+C) 556,827.00


E. OVERHEAD & PROFIT 15%XD 83,524.05
F. HARGA SATUAN PEKERJAAN ( D+E) 640,351.05

94 A 4.4.2.27 1 M2 PASANG ACIAN DINDING


A. Bahan
Semen PC Kg 3.250 1,900.00 6,175.00
Jumlah harga bahan 6,175.00
B. Tenaga
Pekerja L.01 Oh 0.200 150,000.00 30,000.00
Tukang batu L.02 Oh 0.100 175,000.00 17,500.00
Kepala tukang batu L.03 Oh 0.010 185,000.00 1,850.00
Mandor L.04 Oh 0.010 200,000.00 2,000.00
Jumlah harga tenaga kerja 51,350.00
C. Peralatan
Jumlah harga peralatan

D. JUMLAH ( A+B+C) 57,525.00


E. OVERHEAD & PROFIT 15%XD 8,628.75
F. HARGA SATUAN PEKERJAAN ( D+E) 66,153.75

95 1 M2 PASANG VENTILASI KAYU DISERUT


A. Bahan
Kayu klas I M3 0.022 3,500,000.00 77,000.00
Jumlah harga bahan 77,000.00
B. Tenaga
Tukang kayu L.02 Oh 1.800 175,000.00 315,000.00
Kepala tukang kayu L.03 Oh 0.180 185,000.00 33,300.00
Mandor L.04 Oh 0.030 200,000.00 6,000.00
Jumlah harga tenaga kerja 354,300.00
C. Peralatan

D. JUMLAH ( A+B+C) 431,300.00


E. OVERHEAD & PROFIT 15%XD 64,695.00
F. HARGA SATUAN PEKERJAAN ( D+E) 495,995.00
96 A 4.5.2.32 PEMASANGAN 1 M2 SENK
A. Bahan
Seng Bjls 0.25 BH 1.020 80,000.00 81,600.00
Paku KG 0.200 24,000.00 4,800.00
Jumlah harga bahan 86,400.00
B. Tenaga
Pekerja L.01 Oh 1.000 150,000.00 150,000.00
Tukang kayu L.02 Oh 1.000 175,000.00 175,000.00
Kepala tukang kayu L.03 Oh 0.010 185,000.00 1,850.00
Mandor L.04 Oh 0.001 200,000.00 200.00
Jumlah harga tenaga kerja 327,050.00
C. Peralatan

D. JUMLAH ( A+B+C) 413,450.00


E. OVERHEAD & PROFIT 15%XD 62,017.50
F. HARGA SATUAN PEKERJAAN ( D+E) 475,467.50

98 A 4.5.2.32 PEMASANGAN 1 M' NOK PLAT SENK


A. Bahan
Nok Plat Senk BH 1.100 50,000.00 55,000.00
Paku KG 0.050 24,000.00 1,200.00
Jumlah harga bahan 56,200.00
B. Tenaga
Pekerja L.01 Oh 0.500 150,000.00 75,000.00
Tukang kayu L.02 Oh 0.500 175,000.00 87,500.00
Kepala tukang kayu L.03 Oh 0.250 185,000.00 46,250.00
Mandor L.04 Oh 0.250 200,000.00 50,000.00
Jumlah harga tenaga kerja 258,750.00
C. Peralatan
D. JUMLAH ( A+B+C) 314,950.00
E. OVERHEAD & PROFIT 15%XD 47,242.50
F. HARGA SATUAN PEKERJAAN ( D+E) 362,192.50
HITUNGAN VOLUME
KEGIATAN : PEMBANGUNAN RKB SMK UTARA RAYA MEMBANGUN
PEKERJAAN : PEMBANGUNAN RKB SMK UTARA RAYA MEMBANGUN
LOKASI : KECAMATAN SUT Seti
TAHUN ANGGARAN : 2015

DATA UMUM

1 Luas Area Bangunan = 270.00 M


2 Panjang Total Pondasi rolaag bt bata = 31.00 M
3 Panjang Total Pondasi = 86.00 M
4 Panjang Total Dinding = 86.00 M
5 Panjang Total Sloof = 86.00 M
6 Panjang Total Ring Balok = 121.00 M
7 Tinggi Kolom Praktis = 3.50 M
8 Jumlah Kolom Praktis = 38.00 BH
9 Saluran air hujan = 81.20 M'
10 Luas Bukaan Dinding J1 = 51.00 M2
P1 = 11.34 M2
P2 = - M2
J2 = - M2
J3 = - M2
62.34 M2

#REF!
-

I PEKERJAAN PERSIAPAN

1 Pembersihan Lokasi dan pembongkaran 14.00 X 31.00 = 434.00 Ls


2 Pengukuran & Pemasangan Bouplank 32.00 + 66.00 = 98.000 M1
3 Pembuatan Nama Proyek = 1.00 Ls
4 Pembuatan gudang kerja dan alat - alat 3.00 X 3.00 = 9.00 M2

II PEKERJAAN TANAH

1 Galian tanah untuk pondasi 1.00 X 1.00 X 86.00 = 86.00 M3


Galian tanah untuk rolag 0.30 X 0.30 X 31.00 = 2.79 M3
Total = 88.79 M3

Urugan ( sirtu ) tanah dari luar 270.00 - 7.58 X 0.30 = 78.44 M3

2 Urugan tanah bekas galian/timbunan kembali 88.79 - 54.10 = 34.69 M3


3 Urugan pasir dibawah pondasi & lantai = 20.81 M3
- Urugan Pasir bawah pondasi 0.10 X 1.00 X 86.00 = 8.60 M3
- Urugan Pasir bawah lantai 270.00 - 25.80 X 0.05 = 12.21 M3

III PEKERJAAN PASANGAN & BETON

1 Pasangan batu kosong 0.20 X 1.00 X 86.00 = 17.20 M3


2 Pasangan rolaag batu bata 1 pc : 4psr 0.30 X 0.50 X 31.00 = 4.65 M3
3 Pasangan pondasi batu kali 1 pc : 5psr 0.50 X 0.75 X 86.00 = 32.25 M3

4 Pasangan dinding batu bata 1pc : 4psr


- Pas. Bt bata 3.50 X 86.00 - 62.34 = 238.66 M2
Total = 238.66 M2

5 Rabat beton keliling bangunan 1.00 X 81.20 X 0.05 = 4.06 M3


6 Beton bertulang camp. 1 pc : 2 kr : 3 psr

Beton Sloof 15/20


Sloof 15/20 0.15 X 0.20 X 86.00 = 2.58 M3

Beton Kolom Praktis 15/20


Kolom Praktis 15/20 0.20 X 0.20 = 5.32 M3

Beton Ring Balk 15/20


Ring Balk 15/20 0.15 X 0.20 X 121.00 = 3.63 M3
IV PEKERJAAN PLESTERAN

1 Plesteran dinding 1 pc : 5 psr 2.00 X 238.66 = 477.32 M2


2 0 2.00 X 4.06 X 0.05 = 0.41 0
3 Plesteran acian dinding 2.00 X 238.66 = 477.32 M2

V PEKERJAAN LANTAI

1 rabat 0.07 X 0.90 X 49.00 = 3.09 M3


2 Pemasangan keramik 30 x 30 cm r kelas 8.00 X 27.00 = 216.00 M2
Acian selasar 2.00 X 27.00 = 54.00 M2
Total = 270.00 M2

3 Pemasangan keramik 20 x 20 cm ( Kamar Mandi ) 40.00 X 1.00 = 40.00 M2

VI PEKERJAAN KAYU KUSEN, PINTU & JENDELA

1 Kusen pintu / jendela kayu klas I 1.53 M3


2 Pintu panel kayu klas I 8.19 M2
3 PINTU DOUBLE TEAKWOOD 1.30 X 2.10 X 3.00 = 8.19 0
4 Ventilasi kayu yang diserut 15.36 M2
5 Jendela bingkai kaca 3 mm 18.90 M2
6 Jendela kaca mati 3 mm 8.10 M2

VII PEKERJAAN ATAP & PLAFOND

1 Pasang kuda-kuda kayu klas I 0.06 X 0.12 X 437.68 = 3.15 M3


2 Pasang gording kayu klas II 0.05 X 0.10 X 638.00 = 3.19 M3
3 Pasang lisplank kayu klas I 94.00 M'
4 Pasang atap seng gelombang BJLS 0,25 397.26 M2
5 Pasang rangka plafond kayu klas II + triplek 3 mm 339.84 M2
6 Pasang bumbungan seng plat BJLS 0,25 52.50 M'

VIII PEKERJAAN KUNCI & PENGGANTUNG

1 Pasang kunci tanam 3.00 BH


2 Pasang engsel pintu 9.00 PSG
3 Pasang engsel jendela 45.00 PSG
4 Pasang grendel jendela 45.00 BH
5 Pasang kait angin 90.00 BH

IX PEKERJAAN PENGECATAN

1 Pengecatan kayu kusen pintu & jendela 0.21 X 3.00 = 0.63 M2


2 Pengecatan dinding dan plafond 339.84 + 477.32 = 817.16 M2
3 meni senk = 397.26 M2

X PEKERJAAN INSTALASI LISTRIK

1 Titik instalasi Listrik 12.00 + 4.00 = 16.00 TTK


2 Lampu TL 1 x 20 Watt ( bambu ) = 12.00 BH
DAFTAR UPAH DAN HARGA BAHAN

KEGIATAN : FASILITAS SARANA RUANG RAPAT


PEKERJAAN : PEMBANGUNAN RUANG RAPAT DAN RUANG VISUAL KANTOR KEHUTANAN ( MASOHI )
LOKASI : MASOHI - KABUPATEN MALUKU TENGAH
TAHUN ANGGARAN : 2023

NO. URAIAN SATUAN HARGA KETERANGAN


Rp.

A. UPAH

1 Mandor Org / Hr 200,000.00


2 Kepala Tukang Batu Org / Hr 185,000.00
3 Kepala Tukang Kayu Org / Hr 185,000.00
4 Kepala Tukang Besi Org / Hr 185,000.00
5 Kepala Tukang Cat Org / Hr 185,000.00
6 Tukang Pipa Org / Hr 175,000.00
7 Tukang Batu Org / Hr 175,000.00
8 Tukang Kayu Org / Hr 175,000.00
9 Tukang Besi Org / Hr 175,000.00
10 Tukang Cat Org / Hr 150,000.00
11 Tukang Gali Org / Hr 150,000.00
12 Pekerja Org / Hr 150,000.00

B. BAHAN LOK AL

1 Pasir urug M3 386,000.00 On Site


2 Tanah urug M3 260,000.00
3 Tanah katel M3 200,000.00 On Site
4 Pasir Pasang M3 440,000.00 400000
5 Pasir Cor M3 440,000.00 On Site
Pasir Cor kg 314.29 On Site
6 Tanah sirtu ( Tasirtu ) M3 110,000.00 On Site
7 Sirtu M3 110,000.00 On Site
8 Batu pecah 15/20 ( pecah tangan ) M3 200,000.00 On Site
9 Batu pecah 10/15 ( pecah tangan ) M3 200,000.00 On Site
10 Batu pecah 5/7 ( pecah tangan ) M3 200,000.00 On Site
11 Batu pecah 3/5 ( pecah mesin ) M3 220,000.00 On Site
12 Batu pecah 2/3 ( pecah mesin ) M3 220,000.00 On Site
13 Batu pecah 1/2 ( pecah mesin ) M3 220,000.00 On Site
Batu pecah 1/2 ( pecah mesin ) kg 146.67 On Site
14 Batu Kali M3 500,000.00 On Site
15 Batu bata Bh 2,000.00 On Site
16 Paving stone abu-abu / beton kelas 1 Bh 5,000.00 On Site
17 Paving stone warna / beton kelas 1 Bh 6,500.00 On Site
18 Kayu Klas II papan 2/20 M3 1,500,000.00 On Site
19 Kayu Klas II usuk 5/7 M3 1,500,000.00 On Site
20 Kayu Klas II 6/12 (balok) M3 1,500,000.00 On Site
21 Kayu kruing 5/7 M3 1,500,000.00 On Site
22 Kayu kruing 2/3 M3 1,500,000.00 On Site
23 Kayu kruing 8/12 M3 1,500,000.00 On Site
24 Kayu Kls 1 6/12 M3 3,500,000.00 On Site
25 Kayu kls 1 usuk 5/7 M3 3,500,000.00 On Site
26 Kayu Kls 1 ( papan ) M3 3,500,000.00 On Site
27 Kayu dolken dia 8-10 BTG 4,000.00 On Site
28 Air Liter 100.00 On Site
NO. URAIAN SATUAN HARGA KETERANGAN
Rp.
C. BAHAN NON LOKAL

1 Semen Pc Kg 1,900.00 On Site


2 Pc warna Kg 1,500.00 On Site
3 Keramik 40/40 warna M2 60,000.00 On Site
4 Keramik lantai 20x20 M2 60,000.00 On Site
5 Keramik dinding 20x25 M2 60,000.00 On Site
6 Plint keramik M 8,000.00 On Site
7 Beton kanstin Bh 40,000.00 On Site
8 Batu Andesit M2 350,000.00 On Site
9 Besi Beton Polos Kg 17,000.00 On Site
10 Baja Konstruksi Kg 17,000.00 On Site
11 Kawat beton ( bendrat ) Kg 24,000.00 On Site
12 Paku Kg 24,000.00 On Site
13 Paku reng Kg 24,000.00 On Site
14 Paku etrnit Kg 24,000.00 On Site
15 Besi strip Kg 20,000.00 On Site
16 Cat Kayu Kg 50,000.00 On Site
17 Cat Tembok metrolite Kg 24,000.00 On Site
18 Plamur tembok Kg 23,000.00 On Site
19 Dempul kayu Kg 23,000.00 On Site
20 Meni kayu Kg 47,000.00 On Site
21 Meni besi ( zyncromit ) Kg 47,000.00 On Site
22 Minyak Cat ( Thiner A ) Liter 40,000.00 On Site
23 Minyak Cat ( Thiner B ) Liter 20,000.00 On Site
24 Cat besi Kg 47,000.00 On Site
25 Kertas Gosok Lbr 10,000.00 On Site
26 Lem kayu Kg 15,000.00 On Site
27 Kuas Bh 17,000.00 On Site
28 Multiplek 9 mm Lbr 150,000.00 On Site
29 Tripleks 5mm Lbr 85,000.00 On Site
30 Genteng Multiroof M2 100,000.00 On Site
31 Bubungan Genteng Metal M' 50,000.00 On Site
32 Seng gelombang 3" - 5" Lbr 75,000.00 On Site
33 Seng gelombang BJLS 25 Lbr 80,000.00 On Site
34 Seng plat lebar 30 cm M' 50,000.00 On Site
35 Jendela naco 5 mm panjang 50 cm Bh 25,000.00 On Site
36 Kaca polos 3 mm M2 125,000.00 On Site
37 Kaca polos 5 mm M2 150,000.00 On Site
38 Kunci Tanam Pintu Bh 125,000.00 On Site
39 Kunci vibreset alpha kamar mandi Bh 100,000.00 On Site
40 Kunci Tanam Pintu Ganda ex Solid + Gagang Bh 400,000.00 On Site
41 Engsel jendela Bh 20,000.00 On Site
42 Engsel pintu Bh 22,000.00 On Site
43 Grendel Bh 18,000.00 On Site
44 Hak angin Bh 18,000.00 On Site
45 Dor Closer ex. SES/SOLID Bh 350,000.00 On Site
46 Klosed jongkok Bh 350,000.00 On Site
47 Klosed duduk lengkap Bh 2,500,000.00 On Site
48 Wastafel Bh 650,000.00 On Site
49 Urinoir Bh 1,150,000.00 On Site
50 Bak mandi fibreglas 45 x 45 Bh 300,000.00 On Site
51 Lem paralond Bh 6,000.00 On Site
52 Seal tape Bh 1,500.00 On Site
53 Kran air 1/2" Bh 17,500.00 On Site
54 Floor drain Bh 25,000.00 On Site
NO. URAIAN SATUAN HARGA KETERANGAN
Rp.
55 Avour Bh 17,500.00 On Site
56 Pipa PVC 3/8" M' 7,500.00 On Site
57 Lampu TL 20 Watt Bh 90,000.00 On Site
NO. URAIAN SATUAN HARGA KETERANGAN
Rp.

58 Lampu pijar philips putih 18 watt Bh 40,000.00 On Site


59 Lampu pijar philips putih 23 watt Bh 45,000.00 On Site
60 Lampu PL 11 Watt Bh 27,000.00 On Site
61 Saklar tunggal Bh 102,119.59 On Site
62 Saklar ganda Bh 102,119.59 On Site
63 Stop kontak Bh 121,094.59 On Site
64 Kabel NYY 3 Phase M' 17,000.00 On Site
65 Fiting Tempel Bh 65,000.00 On Site
66 T Dooz Bh 5,000.00 On Site
67 Isolator Bh 20,000.00 On Site
68 Lasdop Bh 2,000.00 On Site
69 Gypsum Board 9 mm Lbr 127,500.00 On Site
70 Besi Hollo Galvalum 4 x 4 M' 27,000.00 On Site
71 Besi Hollo Galvalum 2 x 4 M' 22,000.00 On Site
72 Penggantung + Plat Pengikat Bh 6,000.00 On Site
73 Mur Gipsum Kg 23,000.00 On Site
74 Paper Tape Bh 2,000.00 On Site
75 Compound Kg 10,000.00 On Site
76 List Plafond Gypsum 10 cm ( terpasang ) M' 45,000.00 On Site
77 Pintu Panil ( 90 x 200 ) kls I finishing Politur bh 1,850,000.00
78 Pintu Panil ( 140 x 200 ) kls I finishing Politur bh 2,750,000.00
NK 000488646907
000000000000
488646907
488,646,907.00

000 - 1.00 Satu


- 2.00 Dua
- 3.00 Tiga
488 4.00 Empat Ratus 4.00 Empat
8.00 Delapan Puluh 5.00 Lima
8.00 Delapan Juta 6.00 Enam
646 6.00 Enam Ratus 7.00 Tujuh
4.00 Empat Puluh 8.00 Delapan
6.00 Enam Ribu 9.00 Sembilan
907 9.00 Sembilan Ratus
-
7.00 Tujuh

Empat Ratus Delapan Puluh Delapan Juta Enam Ratus Empat Puluh Enam Ribu Sembilan Ratus Tujuh Rupiah
488,646,907.00
Rupiah 488,646,907.00

embilan Ratus Tujuh Rupiah

Anda mungkin juga menyukai