BILL OF QUANTITY
A LANTAI 1
I PEKERJAAN K3 7,953,000.00
II PEKERJAAN PERSIAPAN 17,211,452.23
III PEKERJAAN TANAH 10,648,226.90
IV PEKERJAAN PONDASI 112,527,149.90
V PEKERJAAN BETON 299,180,610.77
VI PEKERJAAN PASANGAN 30,480,739.91
VII PEKERJAAN PENUTUP ATAP 9,715,600.79
VIII PEKERJAAN PLAFOND 35,787,380.72
IX PEKERJAAN PINTU JENDELA 35,387,413.10
X PEKERJAAN LANTAI 67,663,957.58
XI PEKERJAAN INSTALASI LISTRIK 8,177,709.00
XII PEKERJAAN CAT 14,763,962.61
B LANTAI 2
I PEKERJAAN BETON 34,431,427.86
II PEKERJAAN PASANGAN 54,211,885.24
III PEKERJAAN PENUTUP ATAP 109,283,750.66
V PEKERJAAN PINTU JENDELA 17,913,225.05
VI PEKERJAAN LANTAI 30,898,365.03
VII PEKERJAAN INSTALASI LISTRIK 3,691,398.00
VIII PEKERJAAN CAT 6,335,249.91
Total Rp 906,262,505.26
PPn 10% Rp 90,626,250.53
JUMLAH TOTAL Rp 996,888,755.78
Dibulatkan Rp 996,888,755.00
TERBILANG :
Dibuat oleh :
Kontraktor Pelaksanaan
CV. PANCA KARYA JAYA
HARGA SATUAN
NO URAIAN VOLUME SAT. JUMLAH HARGA (Rp.)
(Rp)
1 2 3 4 5 6
A LANTAI 1
I PEKERJAAN K3
1. Pembuatan Kartu Identitas Pekerja (KIP) 6.00 Org 100,000.00 600,000.00
2. Pengarahan K3 (Safety Briefing) 9.00 Org 30,000.00 270,000.00
3. Spanduk K3 Uk.3 x 1 m 1.00 Lbr 80,000.00 80,000.00
4. Poster K3 Uk. 42 x 60 cm 1.00 Bh 80,000.00 80,000.00
5. Papan Informasi K3 1.00 Ls 80,000.00 80,000.00
6. Pembatas Area ( Restricted Area ) 1.00 Bh 100,000.00 100,000.00
7. Topi Pelindung (Safety Helmet ) 6.00 Psg 120,000.00 720,000.00
8. Pelindung Mata (Goggles Spectacles ) 6.00 Psg 25,000.00 150,000.00
9. Pelindung pernapasan dan mulut (Masker) 3.00 Box 15,000.00 45,000.00
10. Sarung Tangan (Safety Gloves ) 6.00 Ls 8,000.00 48,000.00
11. Sepatu Keselamatan (Safety Shoes ) 6.00 Ls 125,000.00 750,000.00
12. Rompi Keselamatan 6.00 Bh 85,000.00 510,000.00
13. BPJS Ketenaga Kerjaan dan Kesehatan Kerja 1.00 Ls 3,200,000.00 3,200,000.00
14. Peralatan P3K 1.00 Ls 150,000.00 150,000.00
15. Rambu Petunjuk 2.00 Bh 80,000.00 160,000.00
16. Rambu Larangan 2.00 Bh 80,000.00 160,000.00
17. Rambu Peringatan 2.00 Bh 80,000.00 160,000.00
18. Rambu Kewajiban 1.00 Bh 80,000.00 80,000.00
19. Alat Pemadam Api Ringan 2.00 Bh 225,000.00 450,000.00
20. Bendera K3 1.00 Bh 50,000.00 50,000.00
21. Bendera Nasional 1.00 Bh 50,000.00 50,000.00
22. Timba cuci tangan lengkap 1.00 Bh 60,000.00 60,000.00
jumlah 7,953,000.00
II PEKERJAAN PERSIAPAN
1. Pembersihan lokasi 1.00 ls 800,000.00 800,000.00
2. Pekerjaan Bongkaran atap 331.93 m2 15,169.00 5,035,084.09
3. Pekerjaan Bongkaran dinding 2.05 m3 670,983.50 1,376,858.14
4. Pekerjaan Papan Nama Proyek 1.00 unit 499,510.00 499,510.00
5. Pekerjaan tes lab besi dan beton 1.00 ls 6,000,000.00 6,000,000.00
6. Sewa Concrete Pump 1.00 ls 3,500,000.00 3,500,000.00
jumlah 17,211,452.23
III PEKERJAAN TANAH
1. Galian tanah untuk pondasi 82.50 m3 73,700.00 6,080,250.00
2. Urugan Tanah Kembali 20.63 m3 53,900.00 1,111,687.50
3. Urugan Basecourse Klas B 20.90 m3 165,354.50 3,456,289.40
jumlah 10,648,226.90
IV PEKERJAAN PONDASI
1. Pekerjaan Pengeboran Pondasi Strous Ø30cm 406.00 m1 50,319.50 20,429,717.00
2. Pas. Pondasi Strous Ø30cm
a Beton mutu f’c = 14,5 MPa, (K175) 32.78 m3 755,385.71 24,762,752.33
b Pembesian Polos 2,038.70 kg 12,051.60 24,569,610.79
3. Pas. Pondasi beton plat 125x125x30 cm
a Beton mutu f’c = 14,5 MPa, (K175) 15.00 m3 755,385.71 11,330,785.71
b Pembesian Ulir 2,162.52 kg 12,051.60 26,061,884.06
c Begesting 2x pakai 48.00 m2 111,925.00 5,372,400.00
jumlah 112,527,149.90
HARGA SATUAN
NO URAIAN VOLUME SAT. JUMLAH HARGA (Rp.)
(Rp)
1 2 3 4 5 6
V PEKERJAAN BETON
1. Beton Sloof (SL1) 15/25 cm -
a Beton mutu f’c = 14,5 MPa, (K175) 2.75 m3 755,385.71 2,073,533.79
b Pembesian Ulir 304.92 kg 12,051.60 3,674,719.38
c Pembesian Polos 196.30 kg 12,051.60 2,365,736.50
d Begesting untuk sloof 3x pakai 36.60 m2 78,650.00 2,878,590.00
2. Beton Sloof (SL2) 20/30 cm -
a Beton mutu f’c = 14,5 MPa, (K175) 0.14 m3 755,385.71 107,415.85
b Pembesian Ulir 14.81 kg 12,051.60 178,464.86
c Pembesian Polos 7.63 kg 12,051.60 92,013.54
d Begesting untuk sloof 3x pakai 1.42 m2 78,650.00 111,840.30
3. Beton kolom 30/40 cm -
a Beton mutu f’c = 14,5 MPa, (K175) 18.43 m3 755,385.71 13,923,269.49
b Pembesian Ulir 1,453.80 kg 12,051.60 17,520,594.33
c Pembesian Polos 835.43 kg 12,051.60 10,068,258.20
d Begesting untuk kolom 3x pakai 168.96 m2 121,498.67 20,528,414.72
4. Beton kolom Praktis 12/12 cm -
a Beton mutu f’c = 14,5 MPa, (K175) 0.12 m3 755,385.71 87,020.43
b Pembesian Polos 27.38 kg 12,051.60 330,032.03
c Begesting untuk kolom 3x pakai 1.92 m2 121,498.67 233,277.44
5. Beton Balok (B1) 30/60 cm -
a Beton mutu f’c = 21,7 Mpa (K250) 9.20 m3 817,323.57 7,517,742.21
b Pembesian Ulir 831.91 kg 12,051.60 10,025,824.92
c Pembesian Polos 227.25 kg 12,051.60 2,738,733.53
d Begesting untuk balok 1x pakai 64.39 m2 371,756.00 23,935,881.82
6. Beton Balok (B2) 20/40 cm -
a Beton mutu f’c = 21,7 Mpa (K250) 3.51 m3 817,323.57 2,865,863.37
b Pembesian Ulir 273.86 kg 12,051.60 3,300,470.30
c Pembesian Polos 214.59 kg 12,051.60 2,586,116.29
d Begesting untuk balok 1x pakai 35.16 m2 371,756.00 13,070,048.75
7. Beton Balok (B3) 20/30 cm -
a Beton mutu f’c = 21,7 Mpa (K250) 4.83 m3 817,323.57 3,944,240.09
b Pembesian Ulir 502.55 kg 12,051.60 6,056,509.83
c Pembesian Polos 256.81 kg 12,051.60 3,095,000.82
d Begesting untuk balok 1x pakai 37.00 m2 371,756.00 13,754,154.14
8. Beton Balok (B5) 15/25 cm -
a Beton mutu f’c = 21,7 Mpa (K250) 1.04 m3 817,323.57 845,929.90
b Pembesian Ulir 114.97 kg 12,051.60 1,385,549.93
c Pembesian Polos 74.01 kg 12,051.60 891,999.01
d Begesting untuk balok 1x pakai 12.42 m2 371,756.00 4,617,209.52
9. Beton Lisplank 35/7 cm -
a Beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm 0.68 m3 755,385.71 510,791.82
b Pembesian Polos 80.27 kg 12,051.60 967,425.39
c Begesting untuk balok 1x pakai 28.15 m2 371,756.00 10,465,674.91
10. Beton Balok (B6) 30x25/60 cm -
a Beton mutu f’c = 21,7 Mpa (K250) 2.82 m3 817,323.57 2,303,013.49
b Pembesian Ulir 255.20 kg 12,051.60 3,075,588.75
c Pembesian Polos 102.64 kg 12,051.60 1,236,954.72
d Begesting untuk balok 1x pakai 21.22 m2 371,756.00 7,887,175.30
11. Beton plat lantai t=12 cm -
a Beton mutu f’c = 21,7 Mpa (K250) 34.81 m3 817,323.57 28,450,741.33
b Pembesian dengan Wiremesh 240.07 m2 6,781.50 1,628,010.97
c Pembesian Polos 1,174.62 kg 12,051.60 14,156,037.45
d Begesting untuk plat Floordeck tipe pelat (JAP≤ 1,2 m) 240.07 m2 140,919.90 33,830,147.17
12. Beton Balok (BLC) 12/15 cm -
a Beton mutu f’c = 14,5 MPa, (K175) 0.12 m3 755,385.71 90,691.61
b Pembesian Polos 23.89 kg 12,051.60 287,958.17
c Begesting untuk balok 3x pakai 2.33 m2 78,650.00 183,608.43
13. Beton plat Canopy t=7 cm -
a Beton mutu f’c = 14,5 MPa, (K175) 0.19 m3 755,385.71 141,075.84
b Pembesian Polos 23.11 kg 12,051.60 278,517.99
HARGA SATUAN
NO URAIAN VOLUME SAT. JUMLAH HARGA (Rp.)
(Rp)
1 2 3 4 5 6
c Begesting untuk plat 1x pakai 3.13 m2 518,496.00 1,625,433.11
14. Beton Balok (BL) 12/15 cm -
a Beton mutu f’c = 14,5 MPa, (K175) 0.73 m3 755,385.71 552,851.70
b Pembesian Polos 145.27 kg 12,051.60 1,750,752.42
c Begesting untuk balok 3x pakai 17.08 m2 78,650.00 1,343,121.78
15. Beton Balok (BB) 15/20 cm -
a Beton mutu f’c = 14,5 MPa, (K175) 0.04 m3 755,385.71 30,210.71
b Pembesian Polos 6.79 kg 12,051.60 81,833.71
c Begesting untuk balok 3x pakai 0.57 m2 78,650.00 45,085.62
16. Beton plat tangga -
a Beton mutu f’c = 21,7 Mpa (K250) 2.16 m3 817,323.57 1,768,197.81
b Pembesian Polos 277.19 kg 12,051.60 3,340,588.09
c Begesting untuk plat 1x pakai 20.57 m2 339,812.00 6,991,020.24
17. Pekerjaan Besi Stek kolom -
a Pembesian Ulir 99.38 kg 12,051.60 1,197,696.88
b Pembesian Polos 12.94 kg 12,051.60 155,950.11
jumlah 299,180,610.77
HARGA SATUAN
NO URAIAN VOLUME SAT. JUMLAH HARGA (Rp.)
(Rp)
1 2 3 4 5 6
VI PEKERJAAN PASANGAN
1. Pasangan Bata Merah 1pc : 5ps 23.88 m2 103,140.40 2,462,992.75
2. Plesteran dinding 1pc : 5ps 47.76 m2 60,283.52 2,879,140.92
3. Plesteran beton 1pc : 3ps 231.53 m2 62,914.28 14,566,474.04
4. Pekerjaan Acian 279.29 m2 37,853.75 10,572,132.20
jumlah 30,480,739.91
VII PEKERJAAN PENUTUP ATAP
1. Pasang kuda-kuda galvalume 47.00 m2 100,851.67 4,740,078.76
2. Pasang Penutup atap seng zincalume t=0.35 46.30 m2 63,140.00 2,923,318.86
3. Pasang Talang seng galvalume datar 14.03 m1 146,272.50 2,052,203.18
jumlah 9,715,600.79
VIII PEKERJAAN PLAFOND
1. Pasang rangka plafond hollow galvalume 283.21 m2 89,841.40 25,444,387.18
2. Pasang penutup plafond gypsumboard 9mm 283.21 m2 36,520.00 10,342,993.54
jumlah 35,787,380.72
IX PEKERJAAN PINTU JENDELA
1. Pasang kusen alumunium 4" Coklat 183.64 m1 109,899.90 20,182,017.64
2. Pasang daun pintu board WPC 0,5cm 4.00 unit 1,250,000.00 5,000,000.00
3. Pasang Engsel pintu 12.00 bj 38,971.90 467,662.80
4. Pasang slot pintu 2x putar 4.00 unit 65,153.00 260,612.00
5. Pasang daun jendela aluminium brown model casement 3 Profil 9.23 m2 434,830.00 4,013,480.90
6. Pasang Engsel Casement uk. 12" 20.00 bj 62,001.50 1,240,030.00
7. Pasang Rabuncis 10.00 bj 46,453.00 464,530.00
8. Pasang kaca Bening t=5mm 30.94 m2 121,511.50 3,759,079.76
jumlah 35,387,413.10
X PEKERJAAN LANTAI
1. Pasang lantai keramik 40x40 cm 305.03 m2 190,629.45 58,147,701.13
2. Pasang lantai keramik 40x40 cm (Rocktile) 30.08 m2 194,094.45 5,838,283.42
3. Pasang keramik dinding 20x25 cm 15.94 m2 230,796.50 3,677,973.02
jumlah 67,663,957.58
XI PEKERJAAN INSTALASI LISTRIK
1. Instalasi titik lampu 31.00 titik 172,293.00 5,341,083.00
2. Pasang lampu LED 12 watt 29.00 bh 45,000.00 1,305,000.00
3. Pasang lampu LED 6 watt 2.00 bh 22,000.00 44,000.00
4. Pasang Stop kontak 16.00 bh 63,833.00 1,021,328.00
5. Pasang saklar ganda 6.00 bh 35,000.00 210,000.00
6. Pasang saklar tunggal 6.00 bh 15,000.00 90,000.00
7. Pasang Box panel (MCB = 3 bh) 1.00 bh 166,298.00 166,298.00
jumlah 8,177,709.00
XII PEKERJAAN CAT
1. Cat dinding baru 279.29 m2 18,030.10 5,035,606.80
2. Cat dinding lama 38.40 m2 13,325.40 511,695.36
3. Cat plafond 283.21 m2 18,030.10 5,106,385.76
4. Cat listplank beton 26.77 m2 18,030.10 482,701.84
5. Pekerjaan Waterprofing dag beton 120.03 m2 30,221.40 3,627,572.86
jumlah 14,763,962.61
HARGA SATUAN
NO URAIAN VOLUME SAT. JUMLAH HARGA (Rp.)
(Rp)
1 2 3 4 5 6
B LANTAI 2
I PEKERJAAN BETON
1. Beton kolom (K2) 20/25 cm -
a Beton mutu f’c = 14,5 MPa, (K175) 2.80 m3 755,385.71 2,115,080.00
b Pembesian Polos 444.56 kg 12,051.60 5,357,697.37
c Begesting untuk kolom 3x pakai 67.20 m2 121,498.67 8,164,710.40
2. Beton kolom (K3) 15/20 cm -
a Beton mutu f’c = 14,5 MPa, (K175) 0.48 m3 755,385.71 362,585.14
b Pembesian Polos 81.49 kg 12,051.60 982,111.44
c Begesting untuk kolom 3x pakai 6.40 m2 121,498.67 777,591.47
3. Beton kolom (KP) 12/12 cm -
a Beton mutu f’c = 14,5 MPa, (K175) 0.12 m3 755,385.71 87,020.43
b Pembesian Polos 36.91 kg 12,051.60 444,858.84
c Begesting untuk kolom 3x pakai 2.40 m2 121,498.67 291,596.80
4. Beton kolom (KP1) 12/12 cm -
a Beton mutu f’c = 14,5 MPa, (K175) 0.13 m3 755,385.71 98,985.74
b Pembesian Polos 42.24 kg 12,051.60 509,021.17
c Begesting untuk kolom 3x pakai 2.73 m2 121,498.67 331,691.36
5. Beton Balok BL 10/15 cm -
a Beton mutu f’c = 14,5 MPa, (K175) 0.75 m3 755,385.71 569,485.29
b Pembesian Polos 228.74 kg 12,051.60 2,756,698.98
c Begesting untuk balok 3x pakai 15.08 m2 78,650.00 1,185,884.70
6. Beton Ring Balok (RB) 10/15 cm -
a Beton mutu f’c = 14,5 MPa, (K175) 0.85 m3 755,385.71 645,628.17
b Pembesian Polos 259.19 kg 12,051.60 3,123,612.47
c Begesting untuk balok 3x pakai 17.09 m2 78,650.00 1,344,443.10
7. Beton Ring Balok (RB1) 10/15 cm -
a Beton mutu f’c = 14,5 MPa, (K175) 0.28 m3 755,385.71 213,245.39
b Pembesian Polos 85.68 kg 12,051.60 1,032,585.81
c Begesting untuk balok 3x pakai 5.65 m2 78,650.00 444,057.90
8. Beton Ring Balok Gewel 10/15 cm -
a Beton mutu f’c = 14,5 MPa, (K175) 0.41 m3 755,385.71 313,409.53
b Pembesian Polos 126.05 kg 12,051.60 1,519,078.87
c Begesting untuk balok 3x pakai 8.30 m2 78,650.00 652,637.70
9. Beton Balok Gantung 15/15 cm -
a Beton mutu f’c = 14,5 MPa, (K175) 0.20 m3 755,385.71 153,985.38
b Pembesian Polos 52.53 kg 12,051.60 633,068.35
c Begesting untuk balok 3x pakai 4.08 m2 78,650.00 320,656.05
jumlah 34,431,427.86
II PEKERJAAN PASANGAN
1. Pasangan dinding bata ringan tebal 10 cm 247.35 m2 105,050.00 25,983,623.77
2. Plesteran dengan mortar siap pakai (MSP) 447.35 m2 56,100.00 25,096,391.10
3. Plesteran beton 1pc : 3ps 31.08 m2 62,914.28 1,955,375.82
4. Pekerjaan Acian 31.08 m2 37,853.75 1,176,494.55
jumlah 54,211,885.24
III PEKERJAAN PENUTUP ATAP
1. Pasang kuda-kuda dobel siku L 60.60.6 789.15 kg 22,770.00 17,968,991.04
2. Pasang kuda-kuda dobel siku L 50.50.5 391.78 kg 22,770.00 8,920,794.17
3. Gording CNP 125.50.20.2,3 914.31 kg 22,770.00 20,818,891.07
4. Pekerjaan plat plendes t=12mm 38.89 kg 22,770.00 885,500.00
5. Pekerjaan Plat simpul t=8mm 214.01 kg 22,770.00 4,873,033.00
6. Pekerjaan Plat penyangga gording t=8mm 21.43 kg 22,770.00 487,894.69
7. Trekstank gording Ø10 mm 81.86 kg 12,051.60 986,495.87
8. Ikatan angin kuda-kuda Ø12 mm 32.97 kg 12,051.60 397,293.16
9. Jarum keras Ø 16 mm 8.00 bh 25,000.00 200,000.00
10. Pekerjaan Pengelasan kuda-kuda 200.00 cm 2,421.32 484,264.00
11. Pekerjaan Perakitan kuda-kuda 1,180.93 kg 828.85 978,814.16
12. Besi Angkur Ø 16 mm 16.00 bh 45,000.00 720,000.00
13. Pasang Draf & Mur M10 untuk Trekstank gording 108.00 bj 12,000.00 1,296,000.00
14. Pasang Baut M12 A-325 untuk kuda-kuda 516.00 bj 14,000.00 7,224,000.00
15. Pasang usuk reng galvalume 240.14 m2 123,592.33 29,679,821.34
HARGA SATUAN
NO URAIAN VOLUME SAT. JUMLAH HARGA (Rp.)
(Rp)
1 2 3 4 5 6
16. Pasang genteng kodok ex. Karangpilang (lama) 240.14 m2 25,712.50 6,174,674.32
17. Pasang genteng bubung ex. Karangpilang 18.43 m1 136,488.00 2,515,473.84
18. Pasang listplank Kalsiplank l=30cm 62.92 m1 74,250.00 4,671,810.00
jumlah 109,283,750.66
V PEKERJAAN PINTU JENDELA
1. Pasang kusen alumunium 4" Coklat 98.17 m1 109,899.90 10,788,873.18
2. Pasang daun pintu board WPC 0,5cm 2.00 unit 1,250,000.00 2,500,000.00
3. Pasang Engsel pintu 6.00 bj 38,971.90 233,831.40
4. Pasang slot pintu 2x putar 2.00 unit 65,153.00 130,306.00
5. Pasang daun jendela aluminium brown model casement 3 Profil 2.77 m2 434,830.00 1,204,044.27
6. Pasang Engsel Casement uk. 12" 12.00 bj 62,001.50 744,018.00
7. Pasang Rabuncis 6.00 bj 46,453.00 278,718.00
8. Pasang kaca Bening t=5mm 16.73 m2 121,511.50 2,033,434.20
jumlah 17,913,225.05
VI PEKERJAAN LANTAI
1. Pasang lantai keramik 40x40 cm 162.09 m2 190,629.45 30,898,365.03
jumlah 30,898,365.03
HARGA SATUAN
NO URAIAN VOLUME SAT. JUMLAH HARGA (Rp.)
(Rp)
1 2 3 4 5 6
VII PEKERJAAN INSTALASI LISTRIK
1. Instalasi titik lampu 14.00 titik 172,293.00 2,412,102.00
2. Pasang lampu LED 12 watt 14.00 bh 45,000.00 630,000.00
3. Pasang Stop kontak 6.00 bh 63,833.00 382,998.00
4. Pasang saklar ganda 2.00 bh 35,000.00 70,000.00
5. Pasang saklar tunggal 2.00 bh 15,000.00 30,000.00
6. Pasang Box panel (MCB = 3 bh) 1.00 bh 166,298.00 166,298.00
jumlah 3,691,398.00
VIII PEKERJAAN CAT
1. Cat dinding baru 31.08 m2 18,030.10 560,375.51
2. Cat listplank kayu 18.88 m2 35,117.50 662,877.93
3. Cat rangka kuda-kuda siku 136.66 m2 37,405.50 5,111,996.47
jumlah 6,335,249.91
906,262,505
90,626,251
996,888,756
ANALISA HARGA SATUAN PEKERJAAN
Pembongkaran 1 m2 plesteran
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.050 85,000.00 4,250.00
Mandor L.04 OH 0.003 130,000.00 325.00
JUMLAH TENAGA KERJA 4,575.00
B BAHAN
A. A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm (K175)
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 1.650 85,000.00 140,250.00
Tukang Batu L.02 OH 0.275 115,000.00 31,625.00
Kepala tukang L.03 OH 0.028 120,000.00 3,360.00
Mandor L.04 OH 0.083 130,000.00 10,790.00
JUMLAH TENAGA KERJA 186,025.00
B BAHAN
semen portland kg 326.000 1,050.00 342,300.00
pasir beton kg 760.000 78.57 59,714.29
kerikil (maks 30 mm) kg 1,029.000 75.00 77,175.00
air Liter 215.000 100.00 21,500.00
JUMLAH HARGA BAHAN 500,689.29
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 686,714.29
E Overhead & Profit (10%) 10% x D (maksimum) 68,671.43
F Harga Satuan Pekerjaan (D+E) 755,385.71
A. 4.4.1.10 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batucampuran 1SP :5PP
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.300 85,000.00 25,500.00
Tukang Batu L.03 OH 0.100 115,000.00 11,500.00
Kepala tukang L.03 OH 0.010 120,000.00 1,200.00
Mandor L.04 OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 40,150.00
B BAHAN
Bata merah Buah 70.000 550.00 38,500.00
Semen Portland Kg 9.680 1,050.00 10,164.00
Pasir pasang m3 0.045 110,000.00 4,950.00
JUMLAH HARGA BAHAN 53,614.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 93,764.00
E Overhead & Profit (10 %) 10% x D (maksimum) 9,376.40
F Harga Satuan Pekerjaan (D+E) 103,140.40
A. 4.4.1.26 Pemasangan 1m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.01 OH 0.260 85,000.00 22,100.00
Tukang batu L.02 OH 0.130 115,000.00 14,950.00
Kepala tukang L.03 OH 0.013 120,000.00 1,560.00
Mandor L.04 OH 0.003 130,000.00 390.00
JUMLAH TENAGA KERJA 39,000.00
B BAHAN
Bata ringan tebal 10 cm m3 0.100 525,000.00 52,500.00
Mortar siap pakai Kg 4.000 1,000.00 4,000.00
JUMLAH HARGA BAHAN 56,500.00
C PERALATAN
Peralatan
JUMLAH HARGA ALAT
A.4.7.1.10. Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga satuan (RP) Jumlah Harga(RP)
A TENAGA
Pekerja L.01 OH 0.020 85,000.00 1,700.00
Tukang cat L.02 OH 0.063 115,000.00 7,245.00
Kepala tukang L.03 OH 0.006 120,000.00 756.00
Mandor L.04 OH 0.003 130,000.00 390.00
JUMLAH TENAGA KERJA 10,091.00
B BAHAN
Plamir Kg 0.100 12,000.00 1,200.00
Cat dasar Kg 0.100 12,000.00 1,200.00
Cat penutup Kg 0.260 15,000.00 3,900.00
JUMLAH HARGA BAHAN 6,300.00
C PERALATAN
II BAHAN PEREKAT
Semen (40Kg) Zak
Semen PC Kg 1,050.00
Semen Warna Kg 8,000.00
Mortar siap pakai Kg 1,000.00
IV BAHAN KAYU
Dolken dia 8 s/d 10 cm btg 35,000.00
Kayu kaso 4/6 cm kayu tahun btg 45,000.00
Papan 2/20 cm kayu tahun m3 2,200,000.00
Kayu kaso 5/7 cm kayu tahun m3 2,200,000.00
VI BAHAN PELAPIS :
Tripleks 9 mm (120x240)mm Lbr 90,000.00
Tripleks 9 mm (120x240)mm m2 31,250.00
XI BAHAN FINISHING :
Cat Dasar Tembok Kg 12,000.00
Cat tembok (Interior) Kg 15,000.00
Cat tembok (Exterior) Kg 15,000.00
Cat tembok (Exterior) weathershield Kg 65,000.00
Cat Meni Kayu/besi Kg
Cat Besi/Kayu Kg 30,000.00
Menie A kg 65,000.00
Menie B kg 35,000.00
Thinerr Liter 15,000.00
Plamir Tembok Kg 12,000.00
Minyak Begisting Liter 8,800.00
Seal Tape Bh
Amplas Lbr 8,000.00
Kuwas Bh 8,000.00
Bensin Liter
Solar Liter 9,700.00
Minyak pelumas Liter 8,800.00
Lem pipa PVC gel Tube
Lem pipa PVC cair Kaleng