Nahendra Putra
Construction-Mechanical-
Engineering
Kegiatan : PEKERJAAN RENOVASI GEDUNG ALKES FARMASI RSPAL dr. RAMELAN TA.2021
Lokasi : RSPAL dr. RAMELAN TA.2021
Tahun anggaran : 2021
JUMLAH HARGA ( Rp )
NO URAIAN PEKERJAAN
SUB TOTAL TOTAL
I. LANTAI 1 Rp 1,029,690,984.71
A PEKERJAAN PERSIAPAN Rp 127,790,000.00
B PEKERJAAN TANAH Rp 72,323,003.20
C PEKERJAAN PASANGAN DAN PLESTERAN Rp 68,386,600.92
D PEKERJAAN BETON DAN BAJA Rp 568,414,812.37
E PEKERJAAN KUSEN Rp 25,065,596.25
F PEKERJAAN PENUTUP LANTAI DAN DINDING Rp 64,884,262.25
G PEKERJAAN LANGIT-LANGIT Rp 58,090,689.84
H PEKERJAAN PENGECATAN Rp 27,616,729.00
I PEKERJAAN PENGGANTUNG DAN PENGUNCI Rp 12,324,150.00
J PEKERJAAN LAIN-LAIN Rp 4,795,140.89
II LANTAI 2 Rp 2,514,901,803.27
A PEKERJAAN PASANGAN DAN PLESTERAN Rp 143,557,451.08
B PEKERJAAN BETON DAN BAJA Rp 754,762,310.76
C PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP Rp 1,014,002,771.78
D PEKERJAAN KUSEN Rp 78,550,799.00
E PEKERJAAN PENUTUP LANTAI DAN DINDING Rp 80,950,345.12
F PEKERJAAN LANGIT-LANGIT Rp 60,561,539.37
G PEKERJAAN PENGECATAN Rp 42,765,652.31
H PEKERJAAN PENGGANTUNG DAN PENGUNCI Rp 17,562,200.00
I PEKERJAAN LAIN-LAIN Rp 22,511,320.10
J PEKERJAAN MEP Rp 299,677,413.75
Terbilang : Lima milyar sembilan ratus tujuh juta seratus sembilan puluh tiga ribu rupiah
BILL OF QUANTITY
Kegiatan : PEKERJAAN RENOVASI GEDUNG ALKES FARMASI RSPAL dr. RAMELAN TA.2021
Lokasi : RSPAL dr. RAMELAN TA.2021
Tahun anggaran : 2021
I LANTAI 1
A PEKERJAAN PERSIAPAN
1 Pembongkaran penutup atap genteng dan Kusen 1.00 Ls Rp 62,565,000.00 Rp 62,565,000.00
dan Pembokaran Rangka Kuda -Kuda Kayu Existing
2 Pembuatan Direksi Keet 30.00 m2 Rp 750,000.00 Rp 22,500,000.00
3 Uitzet dan pasang bouwplank 52.00 m' Rp 300,000.00 Rp 15,600,000.00
4 Pasang pagar penutup proyek 44.00 m' Rp 250,000.00 Rp 11,000,000.00
5 Pembersihan akhir 1.00 Ls Rp 16,125,000.00 Rp 16,125,000.00
Total A.1 Rp 127,790,000.00
B PEKERJAAN TANAH
1 Galian tanah pondasi dan sloof 34.35 m3 Rp 118,500.00 Rp 4,070,475.00
2 Bor strous Ø 30cm 400.00 m' Rp 55,080.00 Rp 22,032,000.00
3 Urugan Tanah kembali untuk peninggian bangunan 30.89 m3 Rp 19,580.00 Rp 604,826.20
4 Urugan Pasir bawah poer dan sloof tb 5cm 4.17 m3 Rp 223,300.00 Rp 931,161.00
5 Urugan Pasir bawah lantai tb 5cm 26.73 m3 Rp 223,300.00 Rp 5,968,809.00
6 Urugan Sirtu untuk peninggian lantai 213.84 m3 Rp 181,050.00 Rp 38,715,732.00
Total B.1 Rp 72,323,003.20
E PEKERJAAN KUSEN
1 Pemasangan kembali Kusen Pintu Eksisting + Daun Pintu 5.00 unit Rp 600,000.00 Rp 3,000,000.00
2 Pemasangan kembali Kusen kisi-kisi eksisting 17.00 Bh Rp 300,000.00 Rp 5,100,000.00
3 Pemasangan kembali Kusen Jendela kisi-kisi eksisting 21.00 Bh Rp 400,000.00 Rp 8,400,000.00
4 Pasang daun pintu WPC uk. 0.95 x 2.1m (P1) 1.00 Bh Rp 1,496,700.00 Rp 1,496,700.00
5 Pemasangan Pintu PVC area KM/WC 1.00 Bh Rp 709,200.00 Rp 709,200.00
Page 2 of 83
6 Pengecatan Kusen dan Kisi-kisi Eksisting dengan Cat minyak 259.50 m2 Rp 24,507.50 Rp 6,359,696.25
Total E.1 Rp 25,065,596.25
G PEKERJAAN LANGIT-LANGIT
1 Pasang langit-langit Kalsiboard 6 mm + Rangka Holow 534.60 m2 Rp 101,845.66 Rp 54,446,689.84
2 Pasang List Gypsump Lbr= 10 cm 182.20 m' Rp 20,000.00 Rp 3,644,000.00
Total G.1 Rp 58,090,689.84
H PEKERJAAN PENGECATAN
1 Cat dinding weathershield Eksterior 346.80 m2 Rp 30,757.00 Rp 10,666,527.60
2 Cat dinding dalam 698.20 m2 Rp 24,277.00 Rp 16,950,201.40
Total H.1 Rp 27,616,729.00
J PEKERJAAN LAIN-LAIN
1 Pasang railling tangga besi hollow 20x40mm & 50x50mm 8.35 m2 Rp 574,268.37 Rp 4,795,140.89
Total J.1 Rp 4,795,140.89
II LANTAI 2
A PEKERJAAN PASANGAN DAN PLESTERAN
1 Pasang dinding bata ringan tb 10cm + Semen Instant 407.38 m2 Rp 107,508.88 Rp 43,796,967.53
2 Pasang dinding bata ringan tb 10cm + Semen Instant (penebalan Kolom) 11.52 m3 Rp 1,075,088.80 Rp 12,385,022.98
3 Plesteran Dinding Bata Ringan dengan semen instant 814.76 m2 Rp 52,500.00 Rp 42,774,900.00
4 Plesteran 1PC : 5PS (pasir biasa) area penebalan kolom 23.04 m2 Rp 51,222.00 Rp 1,180,154.88
5 Acian dengan semen instant 837.80 m2 Rp 29,421.87 Rp 24,649,642.69
6 Benangan Sudut dan openingan kusen 1,381.60 m' Rp 13,586.25 Rp 18,770,763.00
Total A.2 Rp 143,557,451.08
Page 3 of 83
b Connecting plate tb 12mm 100.92 kg Rp 21,825.00 Rp 2,202,579.00
c Rib plate tb 8mm 336.37 kg Rp 21,825.00 Rp 7,341,275.25
d Bolt, Nut and Washer M16-70L 336.00 buah Rp 8,820.00 Rp 2,963,520.00
e Pengecatan Cat meni dan Cat Finish Baja WF 204.48 m2 Rp 24,507.50 Rp 5,011,293.60
2 Balok Rafter Kuda-kuda KD-2/WF 150, terdiri dari :
a Bolt, Nut and Washer M19-70L 1,309.00 kg Rp 25,110.00 Rp 32,868,990.00
b Connecting plate tb 12mm 96.00 kg Rp 21,825.00 Rp 2,095,200.00
c Rib plate tb 8mm 484.45 kg Rp 21,825.00 Rp 10,573,121.25
d Bolt, Nut and Washer M16-70L 1,614.84 buah Rp 8,820.00 Rp 14,242,888.80
e Pengecatan Cat meni dan Cat Finish Baja WF 6.66 m2 Rp 24,507.50 Rp 163,219.95
3 Pasang ring besi CNP 100x50x20x2.3mm terdiri dari :
a CNP 100x50x20x2.3mm 19,324.80 kg Rp 20,610.00 Rp 398,284,128.00
b Pengecatan Cat meni dan Cat Finish Baja WF 4.14 m2 Rp 24,507.50 Rp 101,461.05
4 Gording CNP 125x50x20x2.3mm, terdiri dari :
a CNP 125x50x20x2.3mm 5,962.00 kg Rp 20,610.00 Rp 122,876,820.00
b Connecting plate tb 6mm 28.22 kg Rp 21,825.00 Rp 615,901.50
c Bolt, Nut and Washer M10-70L 240.00 buah Rp 5,670.00 Rp 1,360,800.00
d Pengecatan Cat meni dan Cat Finish Gording CNP 175.00 m2 Rp 24,507.50 Rp 4,288,812.50
5 Pasang trekstang besi Ø 10mm 90.58 kg Rp 14,850.00 Rp 1,345,113.00
6 Pasang ikatan angin besi Ø 16mm 436.80 kg Rp 14,850.00 Rp 6,486,480.00
7 Pasang besi tarik Ø 16mm 187.20 kg Rp 14,850.00 Rp 2,779,920.00
8 Pasang jarum keras Ø 16mm 40.00 Bh Rp 72,000.00 Rp 2,880,000.00
9 Pasang reng usuk galvalum 738.30 m2 Rp 110,025.00 Rp 81,231,457.50
10 Pasang listplank GRC 0.8/30cm + Rangka Galvalume 124.10 m1 Rp 69,392.50 Rp 8,611,609.25
11 Pasang bubungan genteng plastik 534.60 m1 Rp 119,945.00 Rp 64,122,597.00
12 Pasang Lantai Bondek 534.60 m2 Rp 230,935.00 Rp 123,457,851.00
13 Pasang genteng Karang pilang Baru jenis S 20 % dr Existing 80.19 M2 Rp 146,607.50 Rp 11,756,455.43
14 Pasang Bubungan genteng Karang pilang Baru 46.00 m1 Rp 109,145.00 Rp 5,020,670.00
Total C.2 Rp 1,014,002,771.78
D PEKERJAAN KUSEN
1 Pasang kusen alumunium 4 putih 299.00 m' Rp 90,637.00 Rp 27,100,463.00
2 Slimar Alumunium 3 profil putih 190.00 m' Rp 100,548.00 Rp 19,104,120.00
3 Kaca Clear 5mm 58.72 m2 Rp 262,800.00 Rp 15,431,616.00
4 Pasang daun pintu WPC uk. 0.90 x 2.1m (P1) 8.00 Bh Rp 1,496,700.00 Rp 11,973,600.00
5 Pasang daun pintu WPC uk. 0.90 x 2.1m (P3) 2.00 Bh Rp 1,406,700.00 Rp 2,813,400.00
6 Pasang daun pintu PVC KM/WC 3.00 Bh Rp 709,200.00 Rp 2,127,600.00
Total D.2 Rp 78,550,799.00
F PEKERJAAN LANGIT-LANGIT
1 Pasang langit-langit Kalsiboard 6 mm + rangka Hollow 558.90 m2 Rp 101,845.66 Rp 56,921,539.37
2 Pasang List Gypsum L = 10 cm 182.00 m' Rp 20,000.00 Rp 3,640,000.00
Total F.2 Rp 60,561,539.37
G PEKERJAAN PENGECATAN
1 Cat dinding weathershild sisi luar 356.44 m2 Rp 30,757.00 Rp 10,963,025.08
2 Cat dinding dalam 671.96 m2 Rp 24,277.00 Rp 16,313,172.92
3 Cat plafond 638.03 m2 Rp 24,277.00 Rp 15,489,454.31
Total G.2 Rp 42,765,652.31
I PEKERJAAN LAIN-LAIN
1 Pasang railling pembatas besi hollow 20x40mm & 50x50mm lt. 2 39.20 m2 Rp 574,268.37 Rp 22,511,320.10
Total I.2 Rp 22,511,320.10
2 PEKERJAAN PLUMBING
Instalasi Air Bersih
1 Pipa PVC AW dia. 1" 56.00 m' Rp 46,557.50 Rp 2,607,220.00
2 Pipa PVC AW dia. 3/4" 30.00 m' Rp 35,804.75 Rp 1,074,142.50
Page 4 of 83
3 Instalasi Air bekas dan Air Kotor
1 Pipa PVC dia. 2" 8.00 m' Rp 52,025.00 Rp 416,200.00
2 Pipa PVC dia. 3" 38.00 m' Rp 59,315.00 Rp 2,253,970.00
3 Pipa PVC dia. 4" 15.00 m' Rp 73,895.00 Rp 1,108,425.00
4 Avour 1.00 buah Rp 243,000.00 Rp 243,000.00
4 Pekerjaan Sanitary
1 Pekerjaan Memasang Closed Duduk Monoblok 1.00 unit Rp 2,980,590.00 Rp 2,980,590.00
2 Pekerjaan Memasang Jet Shower 1.00 unit Rp 425,250.00 Rp 425,250.00
5 Lantai 2
1 Panel penerangan lantai 1 uk 50 x 40 x 20 cm 1.00 unit Rp 8,661,015.00 Rp 8,661,015.00
include :
MCB 1P/220V 10Ampere 7 buah
MCB 1P/220V 20 Ampere 13 buah
MCB 3P/220V 50 Ampere 1 buah
pilot lamp R-S-T
Kabel BC 6 mm + ground rod
Wirring panel 20%
Bok Panel 50 x 40 x 20 cm
Ongkos pasang
Asessories & Peralatan bantu
2 Pasang penangkal petir konvensional + tinggi Support 1.5 M 3.00 unit Rp 6,022,000.00 Rp 18,066,000.00
3 Grounding Kabel BC 10 mm 6.00 m' Rp 121,500.00 Rp 729,000.00
4 Lampu RMI 2 x 18 watt grill Lampu LED 38.00 buah Rp 776,500.00 Rp 29,507,000.00
5 Downlight PL 11 Watt + fitting 15.00 buah Rp 252,000.00 Rp 3,780,000.00
6 Pasang exhoustfan 2.00 buah Rp 364,500.00 Rp 729,000.00
7 Stop kontak 1 Phasa 30.00 buah Rp 88,200.00 Rp 2,646,000.00
8 Saklar tunggal 3.00 buah Rp 88,200.00 Rp 264,600.00
9 Saklar Seri 6.00 buah Rp 100,800.00 Rp 604,800.00
10 Instalasi penerangan NYM 3x2,5 mm2 + PVC conduit 20mm 59.00 titik Rp 409,160.00 Rp 24,140,440.00
11 Instalasi Stop Kontak 1P NYM 3x2,5 mm2 + PVC conduit 20mm 30.00 titik Rp 461,225.00 Rp 13,836,750.00
12 Instalasi Kabel Power dari Panel lantai 1 ke Panel lantai 2 NYY 4x16 mm2 10.00 m' Rp 135,000.00 Rp 1,350,000.00
6 PEKERJAAN PLUMBING
Instalasi Air Bersih
1 Pipa PVC AW dia. 1" 56.00 m' Rp 46,557.50 Rp 2,607,220.00
2 Pipa PVC AW dia. 3/4" 15.00 m' Rp 35,804.75 Rp 537,071.25
3 Kran air 1/2 7.00 buah Rp 303,750.00 Rp 2,126,250.00
8 Pekerjaan Sanitary
1 Pekerjaan Memasang Closed Duduk Monoblok 3.00 unit Rp 2,980,590.00 Rp 8,941,770.00
2 Pekerjaan Memasang Jet Shower 3.00 unit Rp 425,250.00 Rp 1,275,750.00
Total J.1 Rp 299,677,413.75
II GEDUNG PERBEKALAN
A PEKERJAAN TANAH
1 Galian tanah bawah pondasi rollag 5.13 m3 Rp 118,500.00 Rp 607,905.00
2 Galian saluran keliling bangunan 26.93 m3 Rp 118,500.00 Rp 3,191,205.00
3 Galian tanah bawah rabatan keliling bangunan 20.20 m3 Rp 118,500.00 Rp 2,393,700.00
4 Urugan pasir bawah pondasi rollag 2.02 m3 Rp 223,300.00 Rp 451,066.00
5 Urugan pasir bawah saluran keliling bangunan 2.02 m3 Rp 223,300.00 Rp 451,066.00
6 Urugan pasir bawah rabatan keliling bangunan 10.10 m3 Rp 223,300.00 Rp 2,255,330.00
7 Urugan pasir bawah lantai 103.92 m3 Rp 223,300.00 Rp 23,205,336.00
8 Urugan tanah bawah lantai 508.96 m3 Rp 181,050.00 Rp 92,147,208.00
Total A.II Rp 124,702,816.00
B PEKERJAAN BETON
1 Plat Beton single wiremesh lantai 103.92 m3 Rp 2,296,037.89 Rp 238,604,257.53
2 Rabatan keliling bangunan 10.39 m3 Rp 808,128.50 Rp 8,396,455.12
3 U-Ditch beton saluran keliling bangunan 30x40 16.16 bh Rp 315,000.00 Rp 5,090,400.00
4 Tutup U-Ditch beton 30x40 40.00 bh Rp 270,000.00 Rp 10,800,000.00
5 Kolom praktis 10/10 0.21 m3 Rp 5,386,009.79 Rp 1,131,062.06
6 Balok latei 15/15 10.40 m3 Rp 5,728,754.70 Rp 59,579,048.88
7 Balok latei 10/10 0.21 m3 Rp 5,728,754.70 Rp 1,203,038.49
8 Balok ring 20/30 10.40 m3 Rp 6,032,584.39 Rp 62,738,877.66
9 Kolom Pedestal 30/45 4.66 m3 Rp 3,433,912.62 Rp 16,002,032.81
Total B.II Rp 403,545,172.53
C PEKERJAAN PASANGAN
1 Pas. Dinding Bata Ringan 238.64 m2 Rp 107,508.88 Rp 25,655,919.12
2 Plesteran dinding bata ringan 477.28 m2 Rp 52,500.00 Rp 25,057,200.00
3 Benangan sudut kolom 784.00 m1 Rp 13,586.25 Rp 10,651,620.00
4 Benangan tali air kusen 280.00 m1 Rp 13,586.25 Rp 3,804,150.00
5 Plesteran/render MU beton kolom 323.83 m2 Rp 29,421.87 Rp 9,527,684.16
Total C.II Rp 74,696,573.29
G PEKERJAAN PENGECATAN
Page 5 of 83
1 Cat dinding eksterior 646.20 m2 Rp 30,757.00 Rp 19,875,173.40
2 Cat dinding interior 646.20 m2 Rp 24,277.00 Rp 15,687,797.40
3 Cat Kayu lisplank GRC, Kusen PIntu 255.40 m2 Rp 30,757.00 Rp 7,855,337.80
Total G.II Rp 43,418,308.60
H PEKERJAN BAJA
1 Kolom K1 WF 300, terdiri dari
a WF 300x150x5,5x9 1,562.40 kg Rp 25,110.00 Rp 39,231,864.00
b Conneting plate tb 16 mm 506.42 kg Rp 21,825.00 Rp 11,052,616.50
c Rib plate tb 10 mm 586.56 kg Rp 21,825.00 Rp 12,801,672.00
d Anchors bolt , Nut dan Washer M 22 -700 L 335.00 bh Rp 12,600.00 Rp 4,221,000.00
e Pengecatan cat meni dari Cat meni Baja WF 265.90 m2 Rp 24,507.50 Rp 6,516,544.25
Total H.II Rp 73,823,696.75
TOTAL Rp 5,370,175,811.73
PPN 10% Rp 537,017,581.17
GRAND TOTAL Rp 5,907,193,392.90
DIBULATKAN Rp 5,907,193,000.00
Page 6 of 83
BACKUP VOLUME PEKERJAAN
NAMA KEGIATAN : PEKERJAAN RENOVASI GEDUNG ALKES FARMASI RSPAL dr. RAMELAN TA.2021
NAMA PEKERJAAN : PEKERJAAN RENOVASI GEDUNG ALKES FARMASI RSPAL dr. RAMELAN TA.2021
LOKASI : RUMAH SAKIT ANGKATAN LAUT Dr. RAMELAN SURABAYA
TAHUN ANGGARAN : 2021
A LANTAI 1
I. PEKERJAAN PERSIAPAN DAN PEMATANGAN LAHAN AREA KERJA
5 Pembersihan akhir
panjang lebar tinggi jumlah
sisi panjang = 44.600 x 13.350 x 1.000 x 1.000 = 595.41 m2
total = 595.41 m2
II PEKERJAAN TANAH
-7
BACKUP VOLUME PEKERJAAN
NAMA KEGIATAN : PEKERJAAN RENOVASI GEDUNG ALKES FARMASI RSPAL dr. RAMELAN TA.2021
NAMA PEKERJAAN : PEKERJAAN RENOVASI GEDUNG ALKES FARMASI RSPAL dr. RAMELAN TA.2021
LOKASI : RUMAH SAKIT ANGKATAN LAUT Dr. RAMELAN SURABAYA
TAHUN ANGGARAN : 2021
total = 82.73 m3
3 Pasang bata merah 1PC : 5PS area peninggian dinding bangunan lama
panjang sisi tinggi jumlah
As 2 = 44.000 x 1.000 x 1.400 x 1.000 = 61.60 m2
As 3 = 44.000 x 1.000 x 1.400 x 1.000 = 61.60 m2
Area tangga = 12.000 x 1.000 x 4.100 x 1.000 = 49.20 m2
Area KM/WC = 3.000 x 1.000 x 3.100 x 1.000 = 9.30 m2
Area Lift = 5.550 x 1.000 x 4.000 x 1.000 = 22.20 m2
total = 203.90 m2
5 Plesteran 1 PC : 3 PS tbl. 15 mm
panjang sisi tinggi jumlah
area KM = 3.000 x 2.000 x 1.000 x 1.000 = 6.00 m2
total = 6.00 m2
6 Plesteran 1 PC : 5 PS tbl. 15 mm
panjang sisi tinggi jumlah
As 2 = 44.000 x 1.000 x 1.400 x 1.000 = 61.60 m2
As 3 = 44.000 x 1.000 x 1.400 x 1.000 = 61.60 m2
Area tangga = 12.000 x 1.000 x 4.100 x 1.000 = 49.20 m2
Area KM/WC = 3.000 x 1.000 x 3.100 x 1.000 = 9.30 m2
area kolom As 1 = 1.800 x 1.000 x 2.000 x 12.000 = 43.20 m2
area kolom As 2 = 1.500 x 1.000 x 1.500 x 12.000 = 27.00 m2
area kolom As 2A = 1.500 x 1.000 x 4.000 x 12.000 = 72.00 m2
area kolom As 3 = 1.500 x 1.000 x 1.500 x 12.000 = 27.00 m2
area dinding lama = 44.000 x 2.000 x 2.600 x 15% = 34.32 m2
area rollag bata = 36.800 x 1.000 x 0.600 x 1.000 = 22.08 m2
Area Lift = 5.550 x 2.000 x 4.000 x 1.000 = 44.40 m2
Plesteran Kanopy Ekspose = 3.700 x 2.000 x 11.000 x 1.000 = 81.40 m2
= 4.900 x 0.150 x 11.000 x 1.000 = 8.09 m2
-8
BACKUP VOLUME PEKERJAAN
NAMA KEGIATAN : PEKERJAAN RENOVASI GEDUNG ALKES FARMASI RSPAL dr. RAMELAN TA.2021
NAMA PEKERJAAN : PEKERJAAN RENOVASI GEDUNG ALKES FARMASI RSPAL dr. RAMELAN TA.2021
LOKASI : RUMAH SAKIT ANGKATAN LAUT Dr. RAMELAN SURABAYA
TAHUN ANGGARAN : 2021
total = 541.19 m2
7 Acian
panjang sisi tinggi jumlah
As 2 = 44.000 x 2.000 x 1.400 x 1.000 = 123.20 m2
As 3 = 44.000 x 2.000 x 1.400 x 1.000 = 123.20 m2
Area tangga = 12.000 x 2.000 x 4.100 x 1.000 = 98.40 m2
Area KM/WC = 3.000 x 2.000 x 3.100 x 1.000 = 18.60 m2
area kolom As 1 = 1.800 x 2.000 x 2.000 x 12.000 = 86.40 m2
area kolom As 2 = 1.500 x 2.000 x 1.500 x 12.000 = 54.00 m2
area kolom As 2A = 1.500 x 1.000 x 4.000 x 12.000 = 72.00 m2
area kolom As 3 = 1.500 x 2.000 x 1.500 x 12.000 = 54.00 m2
area dinding lama = 44.000 x 4.000 x 2.600 x 15% = 68.64 m2
area rollag bata = 36.800 x 1.000 x 0.600 x 1.000 = 22.08 m2
Area Lift = 5.550 x 2.000 x 4.000 x 1.000 = 44.40 m2
Plesteran Kanopy Ekspose = 3.700 x 2.000 x 11.000 x 1.000 = 81.40 m2
= 4.900 x 0.150 x 11.000 x 1.000 = 8.09 m2
total = 854.41 m2
s
8 Benangan Sudut
panjang sisi tinggi jumlah
Openingan Kusen Pintu = 7.000 x 2.000 x 1.000 x 3.000 = 42.00 m'
Openingan Kusen BV = 4.800 x 2.000 x 1.000 x 13.000 = 124.80 m'
Openingan Kusen Jendela Belakang = 6.400 x 2.000 x 1.000 x 24.000 = 307.20 m'
area kolom As 1 = 1.000 x 4.000 x 2.000 x 12.000 = 96.00 m'
area kolom As 2 = 1.000 x 4.000 x 1.500 x 12.000 = 72.00 m'
area kolom As 2A = 1.000 x 4.000 x 4.000 x 12.000 = 192.00 m'
area kolom As 3 = 1.000 x 4.000 x 1.500 x 12.000 = 72.00 m'
Area kanopy ekspose = 9.800 x 1.000 x 1.000 x 11.000 = 107.80 m'
total = 1,013.80 m'
-9
BACKUP VOLUME PEKERJAAN
NAMA KEGIATAN : PEKERJAAN RENOVASI GEDUNG ALKES FARMASI RSPAL dr. RAMELAN TA.2021
NAMA PEKERJAAN : PEKERJAAN RENOVASI GEDUNG ALKES FARMASI RSPAL dr. RAMELAN TA.2021
LOKASI : RUMAH SAKIT ANGKATAN LAUT Dr. RAMELAN SURABAYA
TAHUN ANGGARAN : 2021
-10
BACKUP VOLUME PEKERJAAN
NAMA KEGIATAN : PEKERJAAN RENOVASI GEDUNG ALKES FARMASI RSPAL dr. RAMELAN TA.2021
NAMA PEKERJAAN : PEKERJAAN RENOVASI GEDUNG ALKES FARMASI RSPAL dr. RAMELAN TA.2021
LOKASI : RUMAH SAKIT ANGKATAN LAUT Dr. RAMELAN SURABAYA
TAHUN ANGGARAN : 2021
16 #NAME?
panjang lebar tebal jumlah
naik = 4.900 x 1.000 x 0.095 x 1.000 = 0.47 m3
As 3 = 5.400 x 1.000 x 0.095 x 1.000 = 0.51 m3
total = 0.98 m3
-11
BACKUP VOLUME PEKERJAAN
NAMA KEGIATAN : PEKERJAAN RENOVASI GEDUNG ALKES FARMASI RSPAL dr. RAMELAN TA.2021
NAMA PEKERJAAN : PEKERJAAN RENOVASI GEDUNG ALKES FARMASI RSPAL dr. RAMELAN TA.2021
LOKASI : RUMAH SAKIT ANGKATAN LAUT Dr. RAMELAN SURABAYA
TAHUN ANGGARAN : 2021
19 #NAME?
panjang lebar tebal jumlah
= 3.700 x 0.500 x 0.080 x 11.000 = 1.63 m3
total = 1.63 m3
-12
PROGRESS MINGGUAN
Kegiatan : PEKERJAAN RENOVASI GEDUNG ALKES FARMASI RSPAL dr. RAMELAN TA.2021 Minggu ke 1 Realisasi #REF!
Pekerjaan : RSPAL dr. RAMELAN TA.2021 Tanggal 21 Okt - 26 Okt Rencana #REF! -
Lokasi : 2021 Deviasi #REF!
1 PEKERJAAN PERSIAPAN
1 Err:509 Err:509 M2 #REF! Err:509 Err:509 Err:509 Err:509 0.00 0.00% Err:509 Err:509 #REF! Err:509
2 Err:509 Err:509 titik #REF! Err:509 Err:509 20.00 Err:509 0.00 0.00% 20.00 Err:509 #REF! #REF!
3 Err:509 1.00 Ls 500,000.00 500,000.00 Err:509 0.50 50.00% 0.00 0.00% 0.50 50.00% 500,000.00 250,000.00
4 Err:509 1.00 Ls 1,000,000.00 1,000,000.00 Err:509 1,000,000.00
B PEKERJAAN ARSITEKTUR
1 PEKERJAAN PASANGAN
LANTAI - 1
1 - - M2 #REF! #REF! #REF! #REF!
2 - - M2 #REF! #REF! #REF! #REF!
3 - 12.00 M2 #REF! #REF! #REF! #REF!
4 Err:509 Err:509 M' #REF! Err:509 Err:509 #REF!
5 Err:509 - M2 #REF! #REF! #REF! #REF!
PERIODE INI S/D PERIODE LALU KUMULATIF HARGA JUMLAH
HARGA SATUAN JUMLAH HARGA PROSENTASE
NO URAIAN VOLUME Qty Bobot Qty Bobot Qty Bobot SATUAN HARGA
( Rp ) ( Rp ) (%)
% % % (Rp) (Rp)
C PEKERJAAN ELEKTRIKAL
1 PERALATAN UTAMA
1 Panel untuk KWH Meter box PVC Presto setara komponen ABB 1.00 unit 600,000.00 600,000.00 Err:509 600,000.00
D PEKERJAAN PLUMBING
6 Instalasi Vant Pipa ǿ 3/4” PVC AW Ex Wavin 8.00 m' 16,500.00 132,000.00 Err:509 16,500.00
Pompa
1 Pompa Air 1.00 buah 750,000.00 750,000.00 Err:509 750,000.00
2 Pipa Air bersih ǿ 1” PVC AW 12.00 m' 27,500.00 330,000.00 Err:509 27,500.00
3 Pipa Air bersih ǿ 3/4” PVC AW 20.00 m' 16,500.00 330,000.00 Err:509 16,500.00
4 Bolt Valve ǿ 1” 4.00 buah 574,750.00 2,299,000.00 Err:509 574,750.00
5 Foot Valve ǿ1” 1.00 buah 343,900.00 343,900.00 Err:509 343,900.00
6 Radar dan Instalasi radar ( NYM 2 x 2,5 mm ) 1.00 Ls 463,837.50 463,837.50 Err:509 463,837.50
7 Stop kran 1/2" 7.00 buah 299,250.00 2,094,750.00 Err:509 299,250.00
8 Tandon Kap 1100 Ltr Ex Profiltank 2.00 unit 2,800,000.00 5,600,000.00 Err:509 2,800,000.00
9 Grountank kapasitas 4 m3 1.00 unit 6,500,000.00 6,500,000.00 Err:509 6,500,000.00
B PEKERJAAN ARSITEKTUR
1 PEKERJAAN PASANGAN
LANTAI - 2
1 Err:509 Err:509 M2 #REF! Err:509 Err:509 #REF!
2 Err:509 Err:509 M2 #REF! Err:509 Err:509 #REF!
3 Err:509 Err:509 M2 #REF! Err:509 Err:509 #REF!
4 Err:509 Err:509 M' #REF! Err:509 Err:509 #REF!
5 Err:509 Err:509 M2 #REF! Err:509 Err:509 #REF!
6 Err:509 Err:509 M' #REF! Err:509 Err:509 #REF!
7 Err:509 Err:509 M2 #REF! Err:509 Err:509 #REF!
8 Err:509 Err:509 M2 #REF! Err:509 Err:509 #REF!
9 Err:509 Err:509 M2 #REF! Err:509 Err:509 #REF!
10 Err:509 Err:509 M2 #REF! Err:509 Err:509 #REF!
11 Err:509 Err:509 M' #REF! Err:509 Err:509 #REF!
12 Err:509 Err:509 M2 180,000.00 Err:509 Err:509 180,000.00
4 PEKERJAAN ATAP
A PEKERJAAN STRUKTUR
1 Err:509 Err:509 kg #REF! Err:509 Err:509 #REF!
2 Err:509 Err:509 kg #REF! Err:509 Err:509 #REF!
3 Err:509 Err:509 kg #REF! Err:509 Err:509 #REF!
4 Err:509 Err:509 kg #REF! Err:509 Err:509 #REF!
5 Err:509 Err:509 kg #REF! Err:509 Err:509 #REF!
6 Err:509 Err:509 kg #REF! Err:509 Err:509 #REF!
7 Err:509 Err:509 buah #REF! Err:509 Err:509 #REF!
8 Err:509 Err:509 kg #REF! Err:509 Err:509 #REF!
9 Err:509 Err:509 kg #REF! Err:509 Err:509 #REF!
10 Err:509 Err:509 buah #REF! Err:509 Err:509 #REF!
11 Err:509 Err:509 buah #REF! Err:509 Err:509 #REF!
12 Err:509 Err:509 kg #REF! Err:509 Err:509 #REF!
13 Err:509 Err:509 m2 80,000.00 Err:509 Err:509 80,000.00
14 Err:509 Err:509 m2 80,000.00 Err:509 Err:509 80,000.00
15 Err:509 Err:509 m' #REF! Err:509 Err:509 #REF!
16 Err:509 Err:509 m' 80,000.00 Err:509 Err:509 80,000.00
PERIODE INI S/D PERIODE LALU KUMULATIF HARGA JUMLAH
HARGA SATUAN JUMLAH HARGA PROSENTASE
NO URAIAN VOLUME Qty Bobot Qty Bobot Qty Bobot SATUAN HARGA
( Rp ) ( Rp ) (%)
% % % (Rp) (Rp)
Catatan :
II LANTAI 2
A PEKERJAAN PASANGAN DAN PLESTERAN
-18
BACKUP VOLUME PEKERJAAN
NAMA KEGIATAN : PEKERJAAN RENOVASI GEDUNG ALKES FARMASI RSPAL dr. RAMELAN TA.2021
NAMA PEKERJAAN : PEKERJAAN RENOVASI GEDUNG ALKES FARMASI RSPAL dr. RAMELAN TA.2021
LOKASI : RUMAH SAKIT ANGKATAN LAUT Dr. RAMELAN SURABAYA
TAHUN ANGGARAN : 2019
7 Acian
panjang sisi tinggi jumlah
As 1 = 3.400 x 11.000 x 0.200 x 2.000 = 14.96 m2
As 2 sisi dalam = 3.800 x 11.000 x 3.550 x 1.000 = 148.39 m2
As 2 sisi luar = 3.800 x 11.000 x 3.000 x 1.000 = 125.40 m2
As 3 sisi dalam = 3.800 x 11.000 x 3.550 x 1.000 = 148.39 m2
As 3 sisi luar = 3.800 x 11.000 x 3.550 x 1.000 = 148.39 m2
As A = 9.700 x 1.000 x 3.600 x 2.000 = 69.84 m2
Area Brangkas = 12.500 x 1.000 x 3.600 x 2.000 = 90.00 m2
Area Tangga = 7.200 x 1.000 x 3.600 x 2.000 = 51.84 m2
As C" = 9.700 x 1.000 x 3.600 x 2.000 = 69.84 m2
As F = 9.700 x 1.000 x 3.600 x 2.000 = 69.84 m2
As J = 9.700 x 1.000 x 3.600 x 2.000 = 69.84 m2
As L = 9.700 x 1.000 x 3.600 x 2.000 = 69.84 m2
Area Kamar Mandi = 2.800 x 3.000 x 3.600 x 2.000 = 60.48 m2
Area Lift = 4.200 x 1.000 x 3.600 x 2.000 = 30.24 m2
As A Gewel = 5.000 x 0.500 x 3.600 x 2.000 = 18.00 m2
As L Gewel = 5.000 x 0.500 x 3.600 x 2.000 = 18.00 m2
Openingan Kusen P1 = 7.200 x 0.120 x 1.000 x 4.000 = 3.46 m2
Openingan Kusen P2 = 6.100 x 0.120 x 1.000 x 2.000 = 1.46 m2
Openingan Kusen Pintu KM = 5.000 x 0.120 x 1.000 x 3.000 = 1.80 m2
Openingan Kusen Jendela = 6.400 x 0.120 x 1.000 x 28.000 = 21.50 m2
Kolom As 1 = 1.000 x 1.800 x 2.750 x 12.000 = 59.40 m2
Kolom As 2 = 1.000 x 1.000 x 3.700 x 12.000 = 44.40 m2
Kolom As 3 = 1.000 x 1.000 x 3.700 x 12.000 = 44.40 m2
Plesteran Kanopy Ekspose = 3.700 x 2.000 x 19.000 x 1.000 = 140.60 m2
= 4.900 x 0.150 x 19.000 x 1.000 = 13.97 m2
Acian lisplank = 3.400 x 0.600 x 11.000 x 1.000 = 22.44 m2
8 Benangan Sudut
panjang sisi tinggi jumlah
Openingan Kusen P1 = 7.200 x 2.000 x 1.000 x 4.000 = 57.60 m'
Openingan Kusen P2 = 6.100 x 2.000 x 1.000 x 2.000 = 24.40 m'
Openingan Kusen Pintu KM = 5.000 x 2.000 x 1.000 x 3.000 = 30.00 m'
Openingan Kusen Jendela = 6.400 x 4.000 x 1.000 x 28.000 = 716.80 m'
Kolom As 1 = 1.000 x 4.000 x 2.750 x 12.000 = 132.00 m'
Kolom As 2 = 1.000 x 4.000 x 3.700 x 12.000 = 177.60 m'
Kolom As 3 = 1.000 x 4.000 x 3.700 x 12.000 = 177.60 m'
Area kanopy ekspose = 9.800 x 1.000 x 1.000 x 19.000 = 186.20 m'
Area teras = 3.400 x 2.000 x 1.000 x 11.000 = 74.80 m'
Area benangan sudut = 3.800 x 1.000 x 1.000 x 7.000 = 26.60 m'
Area Lisplank beton = 3.400 x 2.000 x 1.000 x 11.000 = 74.80 m'
total = 1,678.40 m'
-19
BACKUP VOLUME PEKERJAAN
NAMA KEGIATAN : PEKERJAAN RENOVASI GEDUNG ALKES FARMASI RSPAL dr. RAMELAN TA.2021
NAMA PEKERJAAN : PEKERJAAN RENOVASI GEDUNG ALKES FARMASI RSPAL dr. RAMELAN TA.2021
LOKASI : RUMAH SAKIT ANGKATAN LAUT Dr. RAMELAN SURABAYA
TAHUN ANGGARAN : 2019
total = 50.73 m3
-20
BACKUP VOLUME PEKERJAAN
NAMA KEGIATAN : PEKERJAAN RENOVASI GEDUNG ALKES FARMASI RSPAL dr. RAMELAN TA.2021
NAMA PEKERJAAN : PEKERJAAN RENOVASI GEDUNG ALKES FARMASI RSPAL dr. RAMELAN TA.2021
LOKASI : RUMAH SAKIT ANGKATAN LAUT Dr. RAMELAN SURABAYA
TAHUN ANGGARAN : 2019
-21
BACKUP VOLUME PEKERJAAN
NAMA KEGIATAN : PEKERJAAN RENOVASI GEDUNG ALKES FARMASI RSPAL dr. RAMELAN TA.2021
NAMA PEKERJAAN : PEKERJAAN RENOVASI GEDUNG ALKES FARMASI RSPAL dr. RAMELAN TA.2021
LOKASI : RUMAH SAKIT ANGKATAN LAUT Dr. RAMELAN SURABAYA
TAHUN ANGGARAN : 2019
total = 5.65 kg
-22
BACKUP VOLUME PEKERJAAN
NAMA KEGIATAN : PEKERJAAN RENOVASI GEDUNG ALKES FARMASI RSPAL dr. RAMELAN TA.2021
NAMA PEKERJAAN : PEKERJAAN RENOVASI GEDUNG ALKES FARMASI RSPAL dr. RAMELAN TA.2021
LOKASI : RUMAH SAKIT ANGKATAN LAUT Dr. RAMELAN SURABAYA
TAHUN ANGGARAN : 2019
-23
BACKUP VOLUME PEKERJAAN
NAMA KEGIATAN : PEKERJAAN RENOVASI GEDUNG ALKES FARMASI RSPAL dr. RAMELAN TA.2021
NAMA PEKERJAAN : PEKERJAAN RENOVASI GEDUNG ALKES FARMASI RSPAL dr. RAMELAN TA.2021
LOKASI : RUMAH SAKIT ANGKATAN LAUT Dr. RAMELAN SURABAYA
TAHUN ANGGARAN : 2019
-24
BACKUP VOLUME PEKERJAAN
NAMA KEGIATAN : PEKERJAAN RENOVASI GEDUNG ALKES FARMASI RSPAL dr. RAMELAN TA.2021
NAMA PEKERJAAN : PEKERJAAN RENOVASI GEDUNG ALKES FARMASI RSPAL dr. RAMELAN TA.2021
LOKASI : RUMAH SAKIT ANGKATAN LAUT Dr. RAMELAN SURABAYA
TAHUN ANGGARAN : 2019
-25
DAFTAR ANALISA HARGA SATUAN
Harga Jumlah
No Uraian Sat Volume
( Rp ) ( Rp )
Bahan/Material :
Kayu Meranti (Papan 2/20) m3 0.007 4,300,000.00 30,100.00
Kayu Meranti (Usuk 5/7) m3 0.012 4,300,000.00 51,600.00
Paku biasa 2" - 5" Kg 0.020 20,250.00 405.00
Nilai HSPK 99,505.00
PEKERJAAN TANAH
3 1,00 m3 Pek. Galian Tanah Konstruksi
Upah :
Pekerja OH 0.750 75,000.00 56,250.00
Mandor OH 0.025 100,000.00 2,500.00
Nilai HSPK 58,750.00
Sewa Peralatan :
Sewa Dump Truck 5 T (min 5 jam) Jam 0.067 135,000.00 9,045.00
Sewa Excavator 6m3 Jam 0.067 225,000.00 15,075.00
Nilai HSPK 41,770.00
Bahan :
Pasir Urug m3 1.200 166,500.00 199,800.00
Nilai HSPK 223,300.00
Sewa peralatan :
Sewa Stamper Jam 0.009 90,000.00 792.00
Nilai HSPK 173,242.00
Bahan :
Sirtu m3 1.200 126,000.00 151,200.00
Sewa peralatan :
Sewa Vibrator Roller (min 5 jam) Jam 0.050 180,000.00 9,000.00
Nilai HSPK 181,050.00
11 1,00 Kg Pek. Pembesian ( besi polos / besi ulir ) SNI 7394:2008 (6.17)
Upah :
Mandor Oh 0.000 100,000.00 40.00
Kepala Tukang Besi Oh 0.001 90,000.00 63.00
Tukang Besi Oh 0.007 85,000.00 595.00
Pembantu tukang Oh 0.007 75,000.00 525.00
Bahan :
Besi Beton ulir/polos Kg 1.050 9,900.00 10,395.00
Kawat Beton Kg 0.015 18,000.00 270.00
Nilai HSPK 11,888.00
Sewa :
Sewa Alat Bantu strouss pile jam 0.400 22,500.00 9,000.00
Nilai HSPK 55,080.00
Bahan :
Kayu meranti bekisting m3 0.045 4,300,000.00 193,500.00
Plywood uk. 122x244x9mm lbr 0.350 117,000.00 40,950.00
Paku Usuk kg 0.300 20,250.00 6,075.00
Minyak Bekisting ltr 0.100 22,500.00 2,250.00
Nilai HSPK 308,815.00
Bahan :
Kayu meranti bekisting m3 0.045 4,300,000.00 193,500.00
Plywood uk. 122x244x9mm lbr 0.350 117,000.00 40,950.00
Paku Usuk kg 0.300 20,250.00 6,075.00
Minyak Bekisting ltr 0.100 22,500.00 2,250.00
Nilai HSPK 308,815.00
Bahan :
Kayu meranti papan bekisting m3 0.040 4,300,000.00 172,000.00
Paku Usuk kg 0.400 20,250.00 8,100.00
Minyak Bekisting ltr 0.200 22,500.00 4,500.00
Kayu kamper balok 4/6, 5/7 m3 0.015 4,500,000.00 67,500.00
Plywood uk. 122x244x9mm lbr 0.350 117,000.00 40,950.00
Nilai HSPK 376,870.00
Bahan :
Kayu meranti papan bekisting m3 0.040 4,300,000.00 172,000.00
Paku Usuk kg 0.400 20,250.00 8,100.00
Minyak Bekisting ltr 0.200 22,500.00 4,500.00
Kayu kamper balok 4/6, 5/7 m3 0.018 4,500,000.00 81,000.00
Plywood uk. 122x244x9mm lbr 0.350 117,000.00 40,950.00
Nilai HSPK 390,370.00
Bahan :
Kayu meranti papan bekisting m3 0.040 4,300,000.00 172,000.00
Paku Usuk kg 0.400 20,250.00 8,100.00
Minyak Bekisting ltr 0.200 22,500.00 4,500.00
Kayu kamper balok 4/6, 5/7 m3 0.015 4,500,000.00 67,500.00
Plywood uk. 122x244x9mm lbr 0.350 117,000.00 40,950.00
Nilai HSPK 376,870.00
Bahan :
Kayu meranti papan bekisting m3 0.040 4,300,000.00 172,000.00
Paku Usuk kg 0.400 20,250.00 8,100.00
Minyak Bekisting ltr 0.200 22,500.00 4,500.00
Kayu kamper balok 4/6, 5/7 m3 0.030 4,500,000.00 135,000.00
Plywood uk. 122x244x9mm lbr 0.350 117,000.00 40,950.00
Nilai HSPK 444,370.00
Bahan :
Kayu meranti papan bekisting m3 0.010 4,300,000.00 43,000.00
Paku Usuk kg 0.100 20,250.00 2,025.00
Minyak Bekisting ltr 0.050 22,500.00 1,125.00
Kayu kamper balok 4/6, 5/7 m3 0.004 4,500,000.00 16,875.00
Bondek tb 0,75mm m2 1.000 126,000.00 126,000.00
Nilai HSPK 230,935.00
Bahan :
Wiremesh M8-150 m2 1.150 75,000.00 86,250.00
Kawat Beton Kg 0.050 18,000.00 900.00
Nilai HSPK 91,430.00
Bahan :
Semen portland (40kg) Zak 8.150 49,500.00 403,425.00
Pasir Beton m3 0.481 270,000.00 129,762.00
Batu Pecah Mesin 1/2 cm m3 0.542 315,000.00 170,604.00
Air (biaya air tawar) Liter 215.000 22.50 4,837.50
Nilai HSPK 808,128.50
Bahan :
Semen portland (40kg) Zak 9.275 49,500.00 459,112.50
Pasir Beton m3 0.436 270,000.00 117,801.00
Batu Pecah Mesin 1/2 cm m3 0.551 315,000.00 173,596.50
Air (biaya air tawar) Liter 215.000 22.50 4,837.50
Nilai HSPK 913,292.50
Bahan :
Semen portland (40kg) Zak 10.325 49,500.00 511,087.50
Pasir Beton m3 0.426 270,000.00 114,912.00
Batu Pecah Mesin 1/2 cm m3 0.537 315,000.00 169,249.50
Air (biaya air tawar) Liter 215.000 22.50 4,837.50
Nilai HSPK 958,031.50
Upah :
Mandor Oh 0.000 100,000.00 30.00
Tukang Besi Oh 0.060 85,000.00 5,100.00
Pekerja Oh 0.080 75,000.00 6,000.00
Bahan :
Electrode Baja E70 Kg 0.100 45,000.00 4,500.00
Shear Connector M13-80L bh 15.000 6,300.00 94,500.00
Sewa :
Sewa Welding Set (min 5 jam) Hari 0.070 180,000.00 12,600.00
Bahan :
Pasir Beton m3 0.024 270,000.00 6,480.00
Angker Besi PJU kg 7.158 11,888.00 85,095.49
Besi Beton (polos) kg 25.018 11,888.00 297,413.98
Plat Strip uk. 3x40 mm m3 1.600 11,700.00 18,720.00
Paku Reng kg 0.125 22,500.00 2,812.50
Kawat Beton kg 0.500 18,000.00 9,000.00
Kayu meranti bekisting m3 0.018 4,300,000.00 75,680.00
Mur + Ring u/ Angker bh 4.000 6,300.00 25,200.00
Penggalian Tanah m3 0.208 118,500.00 24,612.45
Pemasangan Spesi Camp. Strouspile 1PC:2Ps:3Kr m3 0.103 808,128.50 83,398.86
Pekerjaan Beton 1PC:2Ps:3Kr m3 0.105 808,128.50 84,449.43
Sewa Alat
Sewa Vibrator Roller (min 5 jam) jam 0.015 180,000.00 2,736.00
Sewa Concrete Mixer 0.50 m3 (Min 3 jam) jam 0.015 45,000.00 684.00
Sewa Alat Bantu u/ PJU jam 0.271 45,000.00 12,190.50
Sewa Alat Bantu u/ Strous Pile jam 1.200 22,500.00 27,000.00
Bahan :
Semen PC (Portland Cement) 50 kg kg 202.000 1,237.50 249,975.00
Pasir Pasang M3 0.485 225,000.00 109,125.00
Batu Kali Pecah 15/20 Cm M3 1.200 315,000.00 378,000.00
Bahan :
Batu Kali Pecah m3 1.200 315,000.00 378,000.00
Pasir pasang m3 0.300 225,000.00 67,500.00
Bahan :
Semen Portland Zak 0.444 58,500.00 25,974.00
Pasir Pasang M3 0.102 225,000.00 22,950.00
Batu Bata Merah uk. 22x 11 x 4,5 cm buah 140.000 540.00 75,600.00
Bahan :
Semen PC 50 Kg Zak 0.287 58,500.00 16,812.90
Pasir Pasang M3 0.040 225,000.00 9,000.00
Batu Bata Merah uk. 22x 11 x 4,5 cm buah 70.000 540.00 37,800.00
Bahan :
Semen Portland Zak 0.194 58,500.00 11,325.60
Pasir Pasang M3 0.045 225,000.00 10,125.00
Batu Bata Merah uk. 22x 11 x 4,5 cm buah 70.000 540.00 37,800.00
Bahan :
Semen Portland Zak 0.194 58,500.00 11,325.60
Pasir Pasang M3 0.045 225,000.00 10,125.00
Batu Bata Merah uk. 22x 11 x 4,5 cm buah 70.000 540.00 37,800.00
Bahan :
Bata Ringan t=10cm M3 0.100 630,000.00 63,000.00
Semen Instant Kg 3.076 2,880.00 8,858.88
Nilai HSPK 107,508.88
Bahan :
Bata Ringan t=10cm M3 0.100 630,000.00 63,000.00
Semen Instant Kg 3.076 2,880.00 8,858.88
Bahan :
Semen Portland Zak 2.874 1,237.50 3,556.58
Pasir Pasang M3 0.040 225,000.00 9,000.00
Batako buah 13.000 4,500.00 58,500.00
Bahan :
Semen Portland KG 6.240 1,237.50 7,722.00
Pasir pasang M3 0.024 225,000.00 5,400.00
Bahan :
Semen Portland KG 7.776 1,237.50 9,622.80
Pasir pasang M3 0.023 225,000.00 5,175.00
Bahan :
Semen Instant plesteran KG 5.000 2,880.00 14,400.00
Bahan :
Semen Portland KG 3.250 1,237.50 4,021.88
Bahan :
Semen Instant plesteran KG 1.500 2,880.00 4,320.00
Bahan :
Semen Portland KG 1.100 1,237.50 1,361.25
Pasir pasang M3 0.013 225,000.00 2,925.00
PEKERJAAN BAJA/BESI
73 1,00 KG Pekerjaan Pemasangan Baja WF
Upah :
Mandor Oh 0.000 100,000.00 30.00
Kepala Tukang Besi Oh 0.006 90,000.00 540.00
Tukang Besi Oh 0.060 85,000.00 5,100.00
Pekerja Oh 0.006 75,000.00 450.00
Bahan :
Baja Profil WF ASTM KG 1.150 12,600.00 14,490.00
Electrode Baja KG 0.100 45,000.00 4,500.00
Bahan :
Baja Profil Canal C ASTM KG 1.150 12,600.00 14,490.00
Bahan :
Plat Baja t=8 mm ASTM KG 1.150 11,700.00 13,455.00
Electrode Baja E70 KG 0.050 45,000.00 2,250.00
77 1,00 KG Pek. Pasang Plat Sirip Pengaku Kolom, End Plat t=10mm
Upah :
Mandor Oh 0.000 100,000.00 30.00
Kepala Tukang Besi Oh 0.006 90,000.00 540.00
Tukang Besi Oh 0.060 85,000.00 5,100.00
Pekerja Oh 0.006 75,000.00 450.00
Bahan :
Plat Baja t=10 mm KG 1.150 11,700.00 13,455.00
Electrode Baja E70 KG 0.050 45,000.00 2,250.00
Bahan :
Plat Baja t=19 mm KG 1.150 11,700.00 13,455.00
Electrode Baja E70 KG 0.050 45,000.00 2,250.00
Bahan :
Besi hollow 6/6, 4/4, 4/2 KG 1.150 13,500.00 15,525.00
Bahan :
Angkur Bolt Ø 19 p= 60 cm BUAH 1.000 108,000.00 108,000.00
Bahan :
Angkur Bolt Ø 16 p= 60 cm BUAH 1.000 90,000.00 90,000.00
Bahan :
Baut Mur HTB Ø 19 mm BUAH 1.000 9,000.00 9,000.00
Bahan :
Baut Mur HTB Ø 16 mm BUAH 1.000 6,300.00 6,300.00
Bahan :
Baut Mur HTB Ø 12 mm BUAH 1.000 4,050.00 4,050.00
Bahan :
Besi Ø 12 mm U24 KG 1.100 9,900.00 10,890.00
Bahan :
Besi Ø 16 mm U24 KG 1.100 9,900.00 10,890.00
Bahan :
Besi Ø 10 mm U24 KG 1.100 9,900.00 10,890.00
Bahan :
Pekerjaan Penutup Atap Roof Top (U-PVC) M2 1.050 #NAME? #NAME?
Skrup u/ U-PVC BH 3.000 3,600.00 10,800.00
Bahan :
Besi Hollow 5/5 M2 6.000 13,500.00 81,000.00
Awning Kain Tenda M2 1.100 432,000.00 475,200.00
Material Bantu LS 0.150 89,100.00 13,365.00
Bahan :
GRC tb 1cm, lb = 30 Cm LBR 0.330 126,000.00 41,580.00
Paku KG 0.050 20,250.00 1,012.50
Bahan :
Kalsiplank lb = 30 Cm LBR 1.390 126,000.00 175,127.40
Paku KG 0.167 58,500.00 9,751.95
Bahan :
Talang Galvalume L=60cm tb 0,3mm M' 1.000 54,000.00 54,000.00
Paku Buah 5.000 1,800.00 9,000.00
Bahan :
Atap metal sheet motif genteng bertabur pasir m2 1.030 103,500.00 106,605.00
Paku Asbes Sekrup 4 inchi buah 6.000 1,800.00 10,800.00
Bahan :
Wuwung/Jurai Genteng Galvalume bertabur pasir buah 2.400 24,750.00 59,400.00
Paku Asbes Sekrup 4 inchi buah 6.000 1,800.00 10,800.00
Bahan :
Atap genteng karangpilang m2 1.030 123,750.00 127,462.50
Bahan :
Wuwung Genteng plastik buah 4.000 22,500.00 90,000.00
Paku Asbes Sekrup 4 inchi buah 6.000 1,800.00 10,800.00
Bahan :
Wuwung Genteng karangpilang buah 4.000 22,500.00 90,000.00
Bahan :
Hollow Besi 60/60 KG 21.101 21,645.00 456,726.82
Cat Menie besi m2 6.077 24,157.50 146,805.86
Cat Finish besi m2 7.292 24,507.50 178,719.39
Aksesoris 10% Ls 0.100 456,726.82 45,672.68
Bahan :
Hollow Besi 50/50 KG 8.038 21,645.00 173,991.17
Hollow Besi 40/20 KG 9.043 21,645.00 195,740.06
Cat Menie besi m2 1.504 24,157.50 36,332.88
Cat Finish besi m2 1.805 24,507.50 44,231.14
Aksesoris 10% Ls 0.100 369,731.23 36,973.12
Bahan :
Besi Galvalum Ø 5 Cm M' 1.000 63,000.00 63,000.00
Sekrup Ls 1.000 31,500.00 31,500.00
99 1,00 M2 Pek. Rak Antrian Besi Siku L 40.40.4 Stainles + Pipa Stainles Ø 2 Cm
Upah :
Mandor Oh 0.025 100,000.00 2,500.00
Kepala Tukang Aluminium Oh 0.050 90,000.00 4,500.00
Tukang Aluminium Oh 0.500 85,000.00 42,500.00
Pekerja Oh 0.500 75,000.00 37,500.00
Bahan :
Besi Siku L 40x40x4 ASTM M' 4.110 24,750.00 101,722.50
Pipa Steinlishsteel Ø 2 cm M' 8.000 24,750.00 198,000.00
Bahan :
Alluminium Profil Kusen 4" putih M' 1.100 72,000.00 79,200.00
Skrup Fixer BUAH 2.000 900.00 1,800.00
Sealant TUBE 0.060 36,000.00 2,160.00
Bahan :
Alluminium 3 profil M' 1.100 81,000.00 89,100.00
Skrup Fixer BUAH 2.000 900.00 1,800.00
Sealant TUBE 0.060 36,000.00 2,160.00
Bahan :
Kaca polos 5mm M2 1.100 225,000.00 247,500.00
Nilai HSPK 262,800.00
Bahan :
Kaca Cermin 5mm M2 1.100 300,000.00 330,000.00
Nilai HSPK 345,300.00
104 1,00 BH Pasang daun pintu WPC uk. 0.90 x 2.1m (P1)
Upah :
Mandor Oh 0.030 100,000.00 3,000.00
Kepala Tukang Aluminium Oh 0.030 90,000.00 2,700.00
Tukang Aluminium Oh 0.600 85,000.00 51,000.00
Pekerja Oh 0.600 75,000.00 45,000.00
Bahan :
Daun pintu WPC uk. 0.95 x 2.1m (P1) Bh 1.000 1,395,000.00 1,395,000.00
105 1,00 BH Pasang daun pintu WPC uk. 0.90 x 2.1m (P3)
Upah :
Mandor Oh 0.030 100,000.00 3,000.00
Kepala Tukang Aluminium Oh 0.030 90,000.00 2,700.00
Tukang Aluminium Oh 0.600 85,000.00 51,000.00
Pekerja Oh 0.600 75,000.00 45,000.00
Bahan :
Daun pintu WPC uk. 0.90 x 2.1m (P3) Bh 1.000 1,305,000.00 1,305,000.00
106 1,00 BH Pasang daun pintu kaca rangka aluinium uk. 0.90 x 2.1m
Upah :
Slimar aluminium 3/8" m' 9.300 100,548.00 935,096.40
Kaca bening 5mm m2 1.443 262,800.00 379,089.00
Sealant tube 2.000 36,000.00 72,000.00
107 1,00 BH Pasang daun pintu double teakwood uk. 0.55 x 2.16m
Upah :
Mandor Oh 0.016 100,000.00 1,600.00
Kepala Tukang Aluminium Oh 0.105 90,000.00 9,450.00
Tukang Aluminium Oh 1.050 85,000.00 89,250.00
Pekerja Oh 0.350 75,000.00 26,250.00
Bahan :
Lem Kayu kg 0.300 33,750.00 10,125.00
Paku klem dos 0.300 31,500.00 9,450.00
Teakwood uk. 122x244x12mm lembar 1.000 144,000.00 144,000.00
Kayu Meranti Reng 2/3, 3/4 m3 0.020 4,050,000.00 79,380.00
harga per M2 369,505.00
Bahan :
Daun pintu PVC Bh 1.000 607,500.00 607,500.00
109 1,00 BH Pasang daun jendela kaca rangka aluminium uk. 0.72 x 1.46m
Material :
Slimar aluminium Oh 4.360 100,548.00 438,389.28
Kaca Polos 5mm Oh 1.051 262,800.00 276,255.36
Sealant tube 0.500 36,000.00 18,000.00
Bahan :
Gypsumboard 9mm Lembar 0.382 58,500.00 22,343.75
Rangka Hollow Aluminium 4" M' 1.000 90,637.00 90,637.00
Sekrup Buah 4.000 900.00 3,600.00
Bahan :
Gypsumboard 9mm Lembar 1.000 58,500.00 58,500.00
Rangka Galvalume M' 3.700 13,500.00 49,950.00
Sekrup Buah 8.000 900.00 7,200.00
Bahan :
Kisi-kisi aluminium M2 1.000 540,000.00 540,000.00
Sekrup Buah 30.000 900.00 27,000.00
Bahan :
Kaca Cermin 5mm M2 2.110 345,300.00 728,583.00
Bevel kaca M' 6.220 50,000.00 311,000.00
Bahan :
Wallpaper M2 1.200 36,000.00 43,200.00
Lem wallpaper Kg 0.200 40,500.00 8,100.00
Bahan :
Daun Pintu Plat Alluminium BUAH 1.000 810,000.00 810,000.00
Bahan :
Kunci Silinder Pintu BUAH 1.000 225,000.00 225,000.00
Bahan :
Kunci Pintu + Handle Bahan Alluminium BUAH 1.000 450,000.00 450,000.00
Bahan :
Engsel Stainless Steel 4" BUAH 1.000 81,000.00 81,000.00
Bahan :
Engsel Stainless Steel 3" BUAH 1.000 67,500.00 67,500.00
Bahan :
Slot/Grendel Pintu Alluminium BUAH 1.000 15,750.00 15,750.00
Bahan :
hak angin jendela BUAH 1.000 22,500.00 22,500.00
PEKERJAAN LANGIT-LANGIT/PLAFOND
123 1,00 M2 Pekerjaan Plafond Gypsum t=9mm
Upah :
Mandor Oh 0.005 100,000.00 500.00
Kepala Tukang Kayu Oh 0.005 90,000.00 450.00
Tukang Kayu Oh 0.050 85,000.00 4,250.00
Pekerja Oh 0.100 75,000.00 7,500.00
Bahan :
Gypsum Board (120x240x9) mm lbr 0.364 58,500.00 21,294.00
Paku triplek/eternit kg 0.110 450.00 49.50
Bahan :
Hollow Galvalum 40/40 m' 1.667 5,400.00 9,000.00
Hollow Galvalum 40/20 kg 1.250 3,600.00 4,500.00
Ramset bh 1.000 1,800.00 1,800.00
Sekrup Drailling kg 0.110 450.00 49.50
Bahan :
Kalsiboard (120x240x6) mm lbr 0.364 80,000.00 29,120.00
Paku triplek/eternit kg 0.110 450.00 49.50
Bahan :
Hollow Galvalum 40/40 m' 1.667 5,400.00 9,000.00
Hollow Galvalum 40/20 kg 1.250 3,600.00 4,500.00
Ramset bh 1.000 1,800.00 1,800.00
Sekrup Drailling kg 0.110 450.00 49.50
Bahan :
List Plafond Alluminium U 1/2 m' 1.100 12,150.00 13,365.00
Sekrup Drailling kg 0.110 450.00 49.50
Bahan :
Semen Portland Kg 8.434 1,237.50 10,437.08
Pasir Pasang M3 0.026 225,000.00 5,850.00
Bahan :
Granite tile lantai 60x60cm m2 1.060 103,500.00 109,710.00
Semen PC 50 Kg zak 0.164 58,500.00 9,582.30
Pasir Pasang m3 0.045 225,000.00 10,125.00
Semen Warna kg 0.650 18,000.00 11,700.00
Bahan :
Granite tile lantai 60x60cm Unpolished m2 1.000 112,500.00 112,500.00
Semen PC 50 Kg zak 0.164 58,500.00 9,582.30
Pasir Pasang m3 0.045 225,000.00 10,125.00
Semen Warna kg 0.650 18,000.00 11,700.00
Bahan :
Keramik lantai 40x40cm Unpolished m2 1.000 45,000.00 45,000.00
Semen Portland zak 0.164 49,500.00 8,108.10
Pasir Pasang m3 0.045 225,000.00 10,125.00
Semen Warna kg 0.650 18,000.00 11,700.00
Bahan :
Keramik dinding 30x30cm m2 1.050 54,000.00 56,700.00
Semen Portland zak 0.186 49,500.00 9,207.00
Pasir Pasang m3 0.025 225,000.00 5,625.00
Semen Warna kg 1.940 18,000.00 34,920.00
Bahan :
Granite tile dinding 20x50cm gelap m2 1.050 54,000.00 56,700.00
Semen Portland zak 0.186 58,500.00 10,881.00
Pasir Pasang m3 0.025 225,000.00 5,625.00
Semen Warna kg 1.940 18,000.00 34,920.00
132 1,00 M2 Pasang granite tile dinding KM/WC 20x50 motif terang
Upah :
Mandor Oh 0.045 100,000.00 4,500.00
Kepala Tukang Batu Oh 0.045 90,000.00 4,050.00
Tukang Batu Oh 0.450 85,000.00 38,250.00
Pekerja Oh 0.900 75,000.00 67,500.00
Bahan :
Granite tile dinding 20x50cm terang m2 1.050 58,500.00 61,425.00
Semen Portland zak 0.186 58,500.00 10,881.00
Pasir Pasang m3 0.025 225,000.00 5,625.00
Semen Warna kg 1.940 18,000.00 34,920.00
Bahan :
Keramik Step Nosling 5x60 Cm KW.1 m2 2.000 15,750.00 31,500.00
Semen Portland kg 0.570 1,237.50 705.38
Pasir Pasang m3 0.002 225,000.00 337.50
Semen Warna kg 0.090 18,000.00 1,620.00
Bahan :
Granit alam m2 1.000 405,000.00 405,000.00
Semen Portland (50 kg) zak 0.158 58,500.00 9,213.75
Pasir Pasang m3 0.030 225,000.00 6,750.00
Bahan :
Batu alam alur m2 1.000 342,000.00 342,000.00
Semen Portland (50 kg) zak 0.158 58,500.00 9,213.75
Pasir Pasang m3 0.030 225,000.00 6,750.00
Bahan :
Paving Stone Blok tb. 6 Cm Abu-abu K-350 m2 1.000 126,000.00 126,000.00
Bahan :
Kansteen Trap uk. 15x30x25 Cm K-175 m2 1.100 126,000.00 138,600.00
Semen Portland (50 kg) Zak 0.045 58,500.00 2,655.90
Pasir Pasang m3 0.005 225,000.00 1,215.00
PEKERJAAN PENGECATAN
138 1,00 M2 Pekerjaan Pengecatan Dinding Tembok Exterior
Upah :
Mandor Oh 0.003 100,000.00 250.00
Kepala Tukang cat Oh 0.006 90,000.00 567.00
Tukang Cat Oh 0.063 85,000.00 5,355.00
Pekerja Oh 0.020 75,000.00 1,500.00
Bahan :
Cat Tembok Weather Shield 2X kg 0.360 40,500.00 14,580.00
Cat Dasar Alkali Resisting Primer 1X kg 0.100 20,250.00 2,025.00
Kertas Gosok lbr 0.400 7,200.00 2,880.00
Alat Bantu m2 1.000 3,600.00 3,600.00
Bahan :
Cat Tembok 3X kg 0.360 22,500.00 8,100.00
Plmaur kg 0.100 20,250.00 2,025.00
Kertas Gosok lbr 0.400 7,200.00 2,880.00
Alat Bantu m2 1.000 3,600.00 3,600.00
Bahan :
Meni besi kg 0.100 27,000.00 2,700.00
Kuas bh 0.010 15,750.00 157.50
Bahan :
Cat besi kg 0.240 55,000.00 13,200.00
Kuas bh 0.010 15,750.00 157.50
Bahan :
Water Proofing kg 0.680 45,000.00 30,600.00
Bahan :
Coating kg 0.400 49,500.00 19,800.00
Bahan :
Lampu RMI 2x 18 led kap grille BH 1.000 675,000.00 675,000.00
Material Bantu LS 1.000 67,500.00 67,500.00
Bahan :
Lampu Down Light LED 5 watt BH 1.000 153,000.00 153,000.00
Material Bantu LS 1.000 45,900.00 45,900.00
Bahan :
Lampu Down Light LED 11 watt BH 1.000 180,000.00 180,000.00
Material Bantu LS 1.000 54,000.00 54,000.00
Bahan :
Lampu LED strip batang 11 watt BH 1.000 225,000.00 225,000.00
Material Bantu LS 1.000 22,500.00 22,500.00
Bahan :
Exhoustfan 5" BH 1.000 315,000.00 315,000.00
Material Bantu LS 1.000 31,500.00 31,500.00
Bahan :
Stop Kontak 1 Phase BH 1.000 63,000.00 63,000.00
Material Bantu LS 1.000 6,300.00 6,300.00
Bahan :
Skaklar Ganda/Double BH 1.000 72,000.00 72,000.00
Material Bantu LS 1.000 7,200.00 7,200.00
Bahan :
Skaklar Tunggal/Single BH 1.000 63,000.00 63,000.00
Material Bantu LS 1.000 6,300.00 6,300.00
Bahan :
Isolator Buah 4.000 14,400.00 57,600.00
Kabel NYM 3 x 2,5 mm2 m1 12.000 17,100.00 205,200.00
Pipa 20mm Lonjor 3.000 14,400.00 43,200.00
T Doos Pvc Buah 1.000 7,200.00 7,200.00
Fiting Plafon Buah 1.000 16,200.00 16,200.00
Material Bantu LS 1.000 10,260.00 10,260.00
Bahan :
Isolator Buah 4.000 14,400.00 57,600.00
Kabel NYM 3 x 2,5 mm2 m1 15.000 17,100.00 256,500.00
Pipa 20mm Lonjor 4.000 14,400.00 57,600.00
T Doos Pvc Buah 1.000 7,200.00 7,200.00
Material Bantu LS 1.000 12,825.00 12,825.00
Bahan :
Instalasi pipa refregant m1 7.500 135,000.00 1,012,500.00
Instalasi Kabel power AC, NYM 3 x 2.5 mm m1 15.000 17,100.00 256,500.00
Instalasi Kabel power dari indoor AC ke out door AC, m1 15.000 17,100.00 256,500.00
NYM 3 x 2.5 mm
Instalasi pipa drain Ac pipa PVC 3/4 ' AW lonjor 6.000 31,950.00 191,700.00
Isolator Buah 6.000 14,400.00 86,400.00
Pipa 20mm Lonjor 7.500 14,400.00 108,000.00
T Doos Pvc Buah 2.000 7,200.00 14,400.00
Material Bantu LS 1.000 171,720.00 171,720.00
155 1,00 UNIT Pek. Pasang Tiang Listrik Cabang 2 Biasa 5 m'
Upah :
Tukang Cat Oh 0.252 85,000.00 21,437.00
Pekerja Oh 1.010 75,000.00 75,720.00
Bahan :
Tiang Cabang Biasa 2 - 5 m' Unit 1.000 6,075,000.00 6,075,000.00
Sewa Alat :
Sewa Crane 30 ton, min 8 Jam termasuk Mobilisasi/ Jam 0.500 315,000.00 157,500.00
Demobilisasi Operasional/BBM
Bahan :
Penangkal petir Radius 50 meter + suport pipa besi unit 1.000 5,850,000.00 5,850,000.00
Kabel NYY 1x70 mm m¹ 45.000 148,500.00 6,682,500.00
Kabel BC 50 mm m¹ 7.000 90,000.00 630,000.00
Ground penangkal petir panjang 6 m unit 1.000 2,430,000.00 2,430,000.00
Lampu obstruction light + instalasi unit 1.000 1,620,000.00 1,620,000.00
Pipa GIP 2,5" lonjor 0.500 360,000.00 180,000.00
Bahan :
Penangkal petir konvensional unit 1.000 270,000.00 270,000.00
Kabel BC 50 mm m¹ 35.000 135,000.00 4,725,000.00
Ground penangkal petir panjang 6 m unit 1.000 117,000.00 117,000.00
Pipa GIP 3/4" lonjor 1.500 180,000.00 270,000.00
Bahan :
Pipa PVC Ø 1/2" AW LNJR 0.300 22,500.00 6,750.00
Material Bantu % 35.000 6,750.00 2,362.50
Bahan :
Pipa PVC Ø 3/4" AW LNJR 0.300 31,950.00 9,585.00
Material Bantu % 35.000 9,585.00 3,354.75
Bahan :
Pipa PVC Ø 1" AW LNJR 0.300 58,500.00 17,550.00
Material Bantu % 35.000 17,550.00 6,142.50
Bahan :
Pipa PVC Ø 2 " D LNJR 0.300 72,000.00 21,600.00
Material Bantu % 35.000 21,600.00 7,560.00
Bahan :
Pipa PVC Ø 3 " D LNJR 0.300 90,000.00 27,000.00
Material Bantu % 35.000 27,000.00 9,450.00
Bahan :
Pipa PVC Ø 4 " D LNJR 0.300 126,000.00 37,800.00
Material Bantu % 35.000 37,800.00 13,230.00
Bahan :
Pipa PVC Ø 5 " D LNJR 0.300 148,500.00 44,550.00
Material Bantu % 35.000 44,550.00 15,592.50
Bahan :
Closet Duduk Porselen Warna Putih BH 1.000 2,475,000.00 2,475,000.00
Perlengkapan 6% harga closet LS 0.060 2,475,000.00 148,500.00
Bahan :
Pekerjaan Memasang Jet Shower BH 1.000 315,000.00 315,000.00
Material Bantu LS 1.000 63,000.00 63,000.00
Bahan :
Wastafel Besar Warna Buah 1.000 1,170,000.00 1,170,000.00
Perlengkapan 12 % harga kloset Buah 0.120 1,170,000.00 140,400.00
Semen portland (50kg) Zak 0.120 58,500.00 7,020.00
Pasir Pasang m3 0.010 225,000.00 2,250.00
Bahan :
Urinoir BH 1.000 1,800,000.00 1,800,000.00
Perlengkapan 10% harga urinoir LS 0.100 1,800,000.00 180,000.00
Bahan :
Floordrain/Avour Stainlish BH 1.000 180,000.00 180,000.00
Material Bantu LS 1.000 36,000.00 36,000.00
Bahan :
Kran Air Stainlish BH 1.000 225,000.00 225,000.00
Material Bantu LS 1.000 45,000.00 45,000.00
Bahan :
Roof Drain Talang BH 1.000 180,000.00 180,000.00
Material Bantu LS 1.000 36,000.00 36,000.00
Bahan :
Tandon Air Steinlish 1.100 Liter BH 1.000 4,500,000.00 4,500,000.00
Material Bantu LS 1.000 900,000.00 900,000.00
Bahan :
Bata Merah 5 x 11 x 22 cm M2 1.275 106,150.60 135,342.02
Pasang Keramik 30/60 Polished M2 2.550 146,333.10 373,149.41
Pasang Keramik 60/60 Polished M2 0.563 230,017.30 129,384.73
Bahan :
Pompa Air Bersiht Pump BH 1.000 2,250,000.00 2,250,000.00
c/w termasuk pressure switch
Material Bantu LS 1.000 225,000.00 225,000.00
Bahan :
Lampu RMI 2x 18 led kap grille BH 1.0000 675,000.00 675,000.00
Material Bantu LS 1.0000 67,500.00 67,500.00
Bahan :
Lampu Down Light LED 5 watt BH 1.0000 153,000.00 153,000.00
Material Bantu LS 1.0000 45,900.00 45,900.00
Bahan :
Lampu Down Light LED 11 watt BH 1.0000 180,000.00 180,000.00
Material Bantu LS 1.0000 54,000.00 54,000.00
Bahan :
Lampu LED strip batang 11 watt BH 1.0000 225,000.00 225,000.00
Material Bantu LS 1.0000 22,500.00 22,500.00
Bahan :
Exhoustfan 5" BH 1.0000 425,000.00 425,000.00
Material Bantu LS 1.0000 42,500.00 42,500.00
Bahan :
Stop Kontak 1 Phase BH 1.0000 59,500.00 59,500.00
Material Bantu LS 1.0000 5,950.00 5,950.00
Bahan :
Skaklar Ganda/Double BH 1.0000 68,000.00 68,000.00
Material Bantu LS 1.0000 6,800.00 6,800.00
Bahan :
Skaklar Tunggal/Single BH 1.0000 59,500.00 59,500.00
Material Bantu LS 1.0000 5,950.00 5,950.00
Bahan :
Isolator Buah 4.0000 13,600.00 54,400.00
Kabel NYM 3x 2,5 mm2 m1 12.0000 15,300.00 183,600.00
Pipa 20mm Lonjor 3.0000 13,600.00 40,800.00
T Doos Pvc Buah 1.0000 6,800.00 6,800.00
Fiting Plafon Buah 1.0000 15,300.00 15,300.00
Material Bantu LS 1.0000 9,180.00 9,180.00
Bahan :
Isolator Buah 4.0000 13,600.00 54,400.00
Kabel NYM 3 x 2,5 mm2 m1 15.0000 15,300.00 229,500.00
Pipa 20mm Lonjor 4.0000 13,600.00 54,400.00
T Doos Pvc Buah 1.0000 6,800.00 6,800.00
Material Bantu LS 1.0000 11,475.00 11,475.00
Bahan :
Tiang Cabang Biasa 2 - 5 m' Unit 1.0000 5,737,500.00 5,737,500.00
Sewa Alat :
Sewa Crane 30 ton, min 8 Jam termasuk Mobilisasi/ Jam 0.5000 297,500.00 148,750.00
Demobilisasi Operasional/BBM
Bahan :
Penangkal petir konvensional unit 1.0000 250,000.00 250,000.00
Kabel BC 50 mm m¹ 35.0000 75,000.00 2,625,000.00
Ground penangkal petir panjang 6 m unit 1.0000 350,000.00 350,000.00
Pipa GIP 3/4" lonjor 1.5000 24,000.00 36,000.00
Bahan :
Pipa PVC Ø 1/2" AW LNJR 0.3000 21,250.00 6,375.00
Material Bantu % 35.0000 6,375.00 2,231.25
Bahan :
Pipa PVC Ø 3/4" AW LNJR 0.3000 30,175.00 9,052.50
Material Bantu % 35.0000 9,052.50 3,168.38
Bahan :
Pipa PVC Ø 1" AW LNJR 0.3000 55,250.00 16,575.00
Material Bantu % 35.0000 16,575.00 5,801.25
Bahan :
Pipa PVC Ø 2 " D LNJR 0.3000 68,000.00 20,400.00
Material Bantu % 35.0000 20,400.00 7,140.00
Bahan :
Pipa PVC Ø 3 " D LNJR 0.3000 85,000.00 25,500.00
Material Bantu % 35.0000 25,500.00 8,925.00
Bahan :
Pipa PVC Ø 5 " D LNJR 0.3000 140,250.00 42,075.00
Material Bantu % 35.0000 42,075.00 14,726.25
Bahan :
Closet Duduk Porselen Warna Putih BH 1.0000 2,337,500.00 2,337,500.00
Perlengkapan 6% harga closet LS 0.0600 2,337,500.00 140,250.00
Bahan :
Wastafel Besar Warna Buah 1.0000 1,105,000.00 1,105,000.00
Perlengkapan 12 % harga kloset Buah 0.1200 1,105,000.00 132,600.00
Semen portland (50kg) Zak 0.1200 55,250.00 6,630.00
Pasir Pasang m3 0.0100 97,750.00 977.50
Bahan :
Urinoir BH 1.0000 1,700,000.00 1,700,000.00
Perlengkapan 10% harga urinoir LS 0.1000 1,700,000.00 170,000.00
Bahan :
Floordrain/Avour Stainlish BH 1.0000 170,000.00 170,000.00
Material Bantu LS 1.0000 34,000.00 34,000.00
Bahan :
Kran Air Stainlish BH 1.0000 212,500.00 212,500.00
Material Bantu LS 1.0000 10,625.00 10,625.00
Bahan :
Roof Drain Talang BH 1.0000 170,000.00 170,000.00
Material Bantu LS 1.0000 34,000.00 34,000.00
Bahan :
Tandon Air Steinlish 1.100 Liter BH 1.0000 68,000.00 68,000.00
Material Bantu LS 1.0000 13,600.00 13,600.00
Bahan :
Bata Merah 5 x 11 x 22 cm M2 1.2750 #REF! #REF!
Pasang Keramik 30/60 Polished M2 2.5500 #REF! #REF!
Pasang Keramik 60/60 Polished M2 0.5625 - -
Bahan :
Pompa Air Bersiht Pump BH 1.0000 1,487,500.00 1,487,500.00
c/w termasuk pressure switch
Material Bantu LS 1.0000 148,750.00 148,750.00
di buat oleh
Konsultan Perencana
CV. Karya Sejahtera Abadi
(…………………………..)
(Direktur)
Persero Terbatas
Nahendra Putra
Construction-Mechanical-
Engineering
1 Alluminium Profil Kusen 4" ex. Alco, Inkalume, Alexindo M' Rp 72,000.00
2 Aluminium Slimar 3 profil Putih ex. Alco, Inkalume, Alexindo M' Rp 81,000.00
3 Air Lokal LTR Rp 22.50
4 Awning Kain Tenda Amarindo, Dickson, Sunberella M2 Rp 432,000.00
5 Angkur Bolt M-19 p=60 Cm ex. Hanil, Bhiwara, Perwira BH Rp 108,000.00
6 Angkur Bolt M-16 p=60 Cm ex. Hanil, Bhiwara, Perwira BH Rp 90,000.00
7 Atap metal sheet motif genteng bertabur pasir ex. Sakura Roof, Tora-tora, NKU Roof M2 Rp 103,500.00
8 Atap Genteng Plastik ex. Sakura Roof, Skygen M2 Rp 101,250.00
9 Atap Genteng Karangpilang ex. Karangpilang M2 Rp 123,750.00
10 Batu Bata 5x11x22 Cm ex. Mojosari BH Rp 540.00
11 Bata Ringan t=10 Cm ex. Citicon, Bricon, Eticon M3 Rp 630,000.00
12 Bata Ringan t=12,5 Cm ex. Citicon, Bricon, Eticon M3 Rp 630,000.00
13 Batako ex. Mojosari BH Rp 4,500.00
14 Batu Alam Alur ex. Tulungagung, Jember M2 Rp 342,000.00
15 Batu Kali Belah 15/20 cm ex. Mojosari M3 Rp 315,000.00
16 Batu Pecah Mesin 1/2 cm ex. Mojosari M3 Rp 315,000.00
17 Batu Pecah Mesin 2/3 cm ex. Mojosari M3 Rp 292,500.00
18 Bondek tb 0,75 mm ex. BRC, Utomo Deck, TKJ Bondek M2 Rp 126,000.00
19 Besi Profil (Baja Konstruksi) (Ispat Indo, Hanil) ASTM atau BJLS ss400) KG Rp 12,600.00
20 Besi Tulangan/Besi Beton (Polos/Ulir) U24 dan U32 ex. Hanil, Ispat KG Rp 9,900.00
21 Bevel Kaca 5mm ex. Lokal M1 Rp 50,000.00
22 Cat Tembok Weather Shield ex. Jotun, Nippon, Dulux KG Rp 40,500.00
23 Cat Dasar Alkali Resisting Primer ex. Jotun, Nippon, Dulux KG Rp 20,250.00
24 Cat Tembok ex. Jotun, Nippon, Dulux KG Rp 22,500.00
25 Cat Besi ex. Emco, Nippon KG Rp 55,000.00
26 Cat Coating Batu alur ex. Propan, Nippon KG Rp 49,500.00
27 Wood Filler ex. Propan, Nippon KG Rp 54,000.00
28 Closed Duduk Monoblok Porcelain ex. Toto, Amstad, Halmar BH Rp 2,475,000.00
29 Dolken/Kayu Gelam dia 8-10 cm, panjang 4m ex. Lokal BTG Rp 13,500.00
30 Dempul Tembok ex. Black bull KG Rp 13,500.00
31 Daun Pintu Alluminium ex. Indal, Alexindo, Alco BH Rp 810,000.00
32 Daun pintu WPC uk. 0.95 x 2.1m (P1) ex. Duma, Tulus Door BH Rp 1,395,000.00
33 Daun pintu WPC uk. 0.90 x 2.1m (P3) ex. Duma, Tulus Door BH Rp 1,305,000.00
34 Daun pintu PVC ex. Maspion Door BH Rp 607,500.00
35 Engsel Stainless Steel 4" ex. Dorma, Solid, Gradino, Poloma BH Rp 81,000.00
36 Engsel Stainless Steel 3" ex. Dorma, Solid, Gradino, Poloma BH Rp 67,500.00
37 Electrode Baja ex. Nippon, Kobe Steel KG Rp 45,000.00
38 Floordrain/Avour Stainlish ex. Toto, Amstad, Onda BH Rp 180,000.00
39 Grendel/Slot Alluminium ex. Dorma, Solid, Gradino, Poloma BH Rp 15,750.00
40 Gypsum Board (120x240x9) mm ex. Jayaboard, Elephant, Knauff LBR Rp 58,500.00
41 Kalsiboard Board (120x240x6) mm ex. Jayaboard, Elephant, Knauff LBR Rp 80,000.00
42 Galvalume C0,75mm ex. PKJ truss, Kencana, Taso M' Rp 13,500.00
43 Granit Alam ex. Tulungagung M2 Rp 405,000.00
44 Reng Galvalume C75 tb 0,75mm + Usuk galvalume tb 0,4mm ex. PKJ truss, Kencana, Taso M2 Rp 67,500.00
45 Hak Angin ex. Dekkson BH Rp 22,500.00
46 Hollow Galvalume 2/4 ex. PKJ, Mulcindo M' Rp 3,600.00
47 Hollow Galvalume 4/4 ex. PKJ, Mulcindo M' Rp 5,400.00
48 Hollow Besi 6/6 ex. Maspion Steel KG Rp 13,500.00
49 Hollow Besi 4/4 ex. Maspion Steel KG Rp 13,500.00
50 Hollow Besi 4/2 ex. Maspion Steel KG Rp 13,500.00
51 Besi Galvalum Ø 5 Cm ex. Maspion Steel M' Rp 63,000.00
52 Besi Siku L 40x40x4 ASTM atau BJLS ss400 M' Rp 24,750.00
53 Pipa Steinlish steel Ø 2 cm ex. Maspion M' Rp 24,750.00
54 Jet Shower ex. Toto, Amstad, Halmar M2 Rp 315,000.00
55 Jarum keras M16 ex. AJBS BH Rp 72,000.00
56 Kaca Polos 5mm ex. Asahimas M2 Rp 225,000.00
57 Kaca Cermin 5mm ex. Asahimas M2 Rp 300,000.00
58 Kertas Gosok ex. Pedang LBR Rp 7,200.00
59 Kuas ex. Eterna, Impra BH Rp 15,750.00
60 Granite tile lantai 60x60 ex. Indogress, Granito, Essenza M2 Rp 103,500.00
61 Granite tile lantai 60x60 Unpolished ex. Indogress, Granito, Essenza M2 Rp 112,500.00
62 Keramik lantai 40x40 Unpolished ex. Platinum, Asia Tile M2 Rp 45,000.00
63 Keramik Dinding 30x30cm ex. Platinum, Granito, Asia Tile M2 Rp 54,000.00
64 Keramik Dinding 20x50 Terang ex. Platinum, Granito, Asia Tile M2 Rp 58,500.00
65 Keramik Step Nosling 5x60 Cm ex. Platinum, Granito, Asia Tile BH Rp 15,750.00
66 Kayu Meranti Papan 2/20, 4/10 ex. Lokal M3 Rp 4,300,000.00
67 Kayu Meranti Usuk 4/6, 5/7 ex. Lokal M3 Rp 4,300,000.00
68 Kayu Meranti Balok 6/15, 6/12, 8/12 ex. Lokal M3 Rp 4,300,000.00
69 Kawat Beton ex. Lokal KG Rp 18,000.00
70 Kayu Meranti Bekisting Bekisting ex. Lokal M3 Rp 4,050,000.00
71 Kayu Kamper Balok 2/3, 3/5 ex. Lokal M3 Rp 4,320,000.00
72 Kayu Kamper Balok 4/6, 5/7 ex. Lokal M3 Rp 4,500,000.00
73 Kayu Kamper Slimar ex. Lokal M3 Rp 4,770,000.00
74 Handle Pintu ex. SES, Solid, Yale BH Rp 450,000.00
75 Kalsiboard (120x240x3,5) mm ex. GRC, Kalsiplank, Eternit LBR Rp 65,250.00
76 Kalsiplank lb = 20 Cm ex. GRC, Kalsiplank, Eternit LBR Rp 90,000.00
77 Kalsiplank lb = 30 Cm ex. GRC, Kalsiplank, Eternit LBR Rp 126,000.00
78 Kabel NYY 4 x 16 mm ex. Supreme, Eterna M' Rp 135,000.00
79 Kabel NYY 4 x 25 mm ex. Supreme, Eterna M' Rp 180,000.00
80 Kabel NYM 2x2,5mm ex. Supreme, Eterna M' Rp 13,500.00
81 Kabel NYM 3x2,5mm ex. Supreme, Eterna M' Rp 17,100.00
82 Instalasi pipa refregant ex. Supreme, Eterna M' Rp 135,000.00
83 Pipa listrik 20mm ex. Clipsal, Jawara, HPP Lonjor Rp 14,400.00
84 T Doos Pvc ex. Panasonic, Clipsal, Broco Buah Rp 7,200.00
85 Fiting Plafon ex. Panasonic, Clipsal, Broco Buah Rp 16,200.00
86 Isolator ex. Clipsal, Jawara, HPP Buah Rp 14,400.00
87 Kran Air Stainlish ex. ZENH, Onda, Renovo BH Rp 225,000.00
88 Kunci Silinder Pintu ex. SES, Solid, Yale BH Rp 225,000.00
89 Kunci Besar 2x putar ex. SES, Solid, Yale BH Rp 382,500.00
90 Kisi-kisi aluminium 3" Putih ex. Alco, Alexindo M2 Rp 540,000.00
91 List Plafond Alluminium U 1/2 ex. Lokal M' Rp 12,150.00
92 Lampu RMI 2x18 Watt ex. Phillips BH Rp 540,000.00
93 Lampu RMI 2x18 LED kap grille ex. Phillips BH Rp 675,000.00
94 Lampu Down Light LED 5 watt ex. Phillips, Panasonic BH Rp 153,000.00
95 Lampu Down Light LED 11 watt ex. Phillips, Panasonic BH Rp 180,000.00
96 Lampu LED strip batang 11 watt ex. Phillips, Panasonic BH Rp 225,000.00
97 AC Ceiling cased 2PK ex. Panasonic, Daikin BH Rp 18,000,000.00
98 Exhoustfan 5" ex. Phillips, Panasonic BH Rp 315,000.00
99 Penangkal petir Radius 50 meter + suport pipa besi ex. Kurn UNIT Rp 5,850,000.00
100 Kabel NYY 1x70 mm ex. Supreme, Eterna M1 Rp 148,500.00
101 Kabel BC 50 mm ex. Supreme, Eterna M1 Rp 90,000.00
102 Ground penangkal petir panjang 6 m ex. Supreme, Eterna UNIT Rp 2,430,000.00
103 Lampu obstruction light + instalasi ex. Phillips, Panasonic UNIT Rp 1,620,000.00
104 Lem Kayu ex. Fox KG Rp 33,750.00
105 Meni Besi ex. Nippon paint KG Rp 27,000.00
106 Minyak Bekisting ex. Lokal LTR Rp 22,500.00
107 Mur Baut M-19 ex. HTB BH Rp 9,000.00
108 Mur Baut M-16 ex. HTB BH Rp 6,300.00
109 Mur Baut M-12 ex. HTB BH Rp 4,050.00
110 Multiplex Lapis film 1 sisi; t:12 mm 120x240 ex. Tegofilm LMBR Rp 166,500.00
111 Plamuur ex. Black Bull KG Rp 20,250.00
112 Pasir Urug ex. Mojosari M3 Rp 166,500.00
113 Pasir Pasang/Plester (ex Mojokerto) ex. Mojokerto M3 Rp 225,000.00
114 Pasir Cor/Beton (ex Lumajang) ex. Lumajang M3 Rp 270,000.00
115 Paku Reng/Usuk ex. Lokal KG Rp 20,250.00
116 Plywood 122x244x9mm Uk .122x244x9 mm ex. Lokal LMBR Rp 117,000.00
117 Plat Baja (Gunung garuda, Hanil) KG Rp 11,700.00
118 Pipa PVC Ø 1/2" AW ex. Maspion, Wavin LONJOR Rp 22,500.00
119 Pipa PVC Ø 3/4" AW ex. Maspion, Wavin LONJOR Rp 31,950.00
120 Pipa PVC Ø 1" AW ex. Maspion, Wavin LONJOR Rp 58,500.00
121 Pipa PVC Ø 2" D ex. Maspion, Wavin LONJOR Rp 72,000.00
122 Pipa PVC Ø 3" D ex. Maspion, Wavin LONJOR Rp 90,000.00
123 Pipa PVC Ø 4" D ex. Maspion, Wavin LONJOR Rp 126,000.00
124 Pipa PVC Ø 5" D ex. Maspion, Wavin LONJOR Rp 148,500.00
125 Pipa GIP 2,5" ex. Maspion Steel LONJOR Rp 360,000.00
126 Paku Triplek/Eternit ex. Lokal KG Rp 22,500.00
127 Paku Klem (No 4) / Beton ex. Nail DOZ Rp 31,500.00
128 Paku Sumbat ex. Nail BUAH Rp 1,800.00
129 Roof Drain ex. Toto, Amstad, Onda BH Rp 180,000.00
130 Ramset ex. Lokal BH Rp 1,800.00
131 Semen PC 50 Kg 50 Kg ex. Gresik, Tiga Roda, Holcim ZAK Rp 58,500.00
132 Semen PC 40 Kg 40 Kg ex. Gresik, Tiga Roda, Holcim ZAK Rp 49,500.00
133 Semen Portland ex. Gresik, Tiga Roda, Holcim KG Rp 1,237.50
134 Semen Instant ex. PM200, Mu380 KG Rp 2,880.00
135 Semen Warna ex. Sika, Lemkra KG Rp 18,000.00
136 Sirtu ex. Mojosari M3 Rp 126,000.00
137 Stop Kontak 1 Phase ex. Panasonic, Clipsal, Broco BH Rp 63,000.00
138 Saklar Ganda/Double ex. Panasonic, Clipsal, Broco BH Rp 72,000.00
139 Saklar Tunggal ex. Panasonic, Clipsal, Broco BH Rp 63,000.00
140 Sekrup u/ U-PVC ex. Rooftop, Maspion BH Rp 3,600.00
141 Skrup Fisher ex. Lokal BH Rp 900.00
142 Skrup Drailling ex. Lokal BH Rp 450.00
143 Sealent ex. Shinetzu TUBE Rp 36,000.00
144 Shear Connector M13-80L BH Rp 6,300.00
144 Teakwood Uk.122 x 244 x 12 mm ex. Palm LMBR Rp 144,000.00
145 Tandon Air Steinlish 1.100 Liter ex. Covina, Pinguin UNIT Rp 4,500,000.00
146 Talang Galvalume L=60cm tb 0,3mm ex. Gajah Tunggal M' Rp 54,000.00
147 Urinoir ex. American Standard BH Rp 1,800,000.00
148 Waterproofing/coating ex. Propan, Sika, Aquaproof KG Rp 45,000.00
149 Washtafel ex. Asahimas BH Rp 1,170,000.00
150 Wiremesh M10-150 ex. BRC M2 Rp 75,000.00
151 Wiremesh M8-150 ex. BRC M2 Rp 75,000.00
152 Wuwung/Jurai Genteng Galvalume bertabur pasir ex. Sakura Roof, Tora-tora, NKU Roof BH Rp 24,750.00
153 Wuwung/Jurai Genteng Plastik ex. Sakura Roof, Skygen BH Rp 22,500.00
154 Wuwung/Jurai Genteng Karangpilang ex. KarangPilang BH Rp 22,500.00
155 Wallpaper ex. King, Queen M2 Rp 36,000.00
156 Lem Wallpaper ex. King, Queen Kg Rp 40,500.00
157 MCB 3phase 100 A ex. Schneider BH Rp 1,080,000.00
158 MCB 3 Phase 60 A ex. Schneider BH Rp 720,000.00
159 MCB 3 Phase 50 A ex. Schneider BH Rp 630,000.00
160 MCB 3 Phase 40A ex. Schneider BH Rp 495,000.00
161 MCB 3 Phase 30A ex. Schneider BH Rp 405,000.00
162 MCB 3 Phase 25A ex. Schneider BH Rp 405,000.00
163 MCB 1 Phase 20 A ex. Schneider BH Rp 135,000.00
164 MCB 1 Phase 10 A ex. Schneider BH Rp 135,000.00
165 Bar cooper ex. Schneider BH Rp 180,000.00
166 Busbar strip ex. Schneider BH Rp 135,000.00
167 Terminal Blok ex. Lokal BH Rp 108,000.00
168 Fuse lamp ex. Schneider BH Rp 90,000.00
169 Pilot lamp R-S-T ex. Schneider BH Rp 108,000.00
170 Ampere Meter ex. Schneider BH Rp 180,000.00
171 Volt Meter ex. Schneider BH Rp 180,000.00
172 Kabel BC 6 mm + ground rod ex. Lokal M' Rp 84,150.00
173 Kabel BC 50 mm + ground rod ex. Lokal M' Rp 135,000.00
174 Bok Panel 50 x 40 x 20 cm ex. Schneider BH Rp 1,350,000.00
175 Bok Panel 60 x 40 x 20 cm ex. Schneider BH Rp 1,530,000.00
176 Selector Switch ex. Schneider BH Rp 225,000.00
177 Pengadaan dan Pemasangan Lift Barang Kapasitas 5 ton ex. Fuji/Hyundai BH Rp 67,500,000.00
178 Pipa GIP 3/4" ex. Spindo Lonjor Rp 180,000.00
179 U-Ditch beton saluran keliling bangunan 30x40 ex. Calvary, Intidi, Lisa, Dimulsa BH Rp 315,000.00
180 Tutup U-Ditch beton 30x40 ex. Calvary, Intidi, Lisa, Dimulsa BH Rp 270,000.00
181 Arrester PF 3P+N65kA ex. Schneider BH Rp 1,575,000.00
182 Grounding BC 10 mm2+Pipa 1/2" ex. Lokal M' Rp 121,500.00
183 Grounding BC 6 mm2+Pipa 1/2" ex. Lokal M' Rp 99,000.00
184 Paving Stone Blok tb. 6 Cm Abu-abu K-350 ex. Ubin Beton, Conblock, Mercu M2 Rp 126,000.00
185 Kansteen Trap uk. 15x30x25 Cm K-175 ex. Ubin Beton, Conblock, Mercu M' Rp 126,000.00
186 Kabel NYY 4 X 4 mm ex Supreme ex. Supreme, Eterna M' Rp 72,000.00
187 Tiang Cabang Biasa 2 - 5 m' ex. Spindo, Maspion UNIT Rp 6,075,000.00
188 Pompa Air Bersih Jet Pump termasuk presure switch ex. Wasser BUAH Rp 2,250,000.00
B UPAH
1 Mandor Oh Rp 100,000.00
2 Kepala Tukang Oh Rp 90,000.00
3 Tukang Oh Rp 85,000.00
4 Pekerja Oh Rp 75,000.00
5 Operator Alat Konstruksi Oh Rp 100,000.00
6 Pembantu Operator Oh Rp 85,000.00
C SEWA PERALATAN
1 Sewa Dump Truck 5 T (min 5 jam) Jam Rp 135,000.00
2 Sewa Excavator 6m3 Jam Rp 225,000.00
3 Sewa Stamper Jam Rp 90,000.00
4 Sewa Dump Truck 3,5 T (min 5 jam) Jam Rp 90,000.00
5 Sewa Motor Grader 125 - 140 Pk (min 5 jam) Jam Rp 270,000.00
6 Sewa Truck Tangki Air (min 5 jam) Hari Rp 315,000.00
7 Sewa Vibrator Roller (min 5 jam) Jam Rp 180,000.00
8 Sewa Welding Set (min 5 jam) Hari Rp 180,000.00
9 Sewa Concrete Mixer 0.50 m3 (Min 3 jam) Jam Rp 45,000.00
10 Sewa Alat Bantu u/ Penerangan Jalan Umum Jam Rp 45,000.00
11 Sewa Alat Bantu u/ Strous Pile Jam Rp 22,500.00
12 Alat Bantu (1 set @ 3 alat) M3 Rp 3,600.00
13 Sewa Pompa Beton M3 Rp 50,400.00
14 Sewa Crane 30 ton, min 8 Jam termasuk Mobilisasi/ Jam Rp 315,000.00
Demobilisasi Operasional/BBM
D LAIN-LAIN
1 Persiapan dan Sewa Direksi Keet Ls Rp 180,000.00
2 Mobilisasi dan Demobilisasi Ls Rp 3,150,000.00
3 Pembersihan lokasi / lapangan Ls Rp 2,300,000.00
4 Air Kerja/Listrik Kerja Ls Rp 1,000,000.00
5 Tes comisioning Ls Rp 7,000,000.00
I LANTAI 1
A PEKERJAAN PERSIAPAN
1 Pembongkaran penutup atap genteng dan Kusen 1.00 Ls #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? 100%
B PEKERJAAN TANAH
1 Galian tanah pondasi dan sloof 34.35 m3 #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME?
### ###
#NAME? ### #NAME? ### #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME?
2 Bor strous Ø 30cm 400.00 m' #NAME? #NAME? #NAME?
3 Urugan Tanah kembali untuk peninggian bangunan 30.89 m3 #NAME? #NAME?
4 Urugan Pasir bawah poer dan sloof tb 5cm 4.17 m3 #NAME? #NAME? #NAME?
6 Urugan Sirtu untuk peninggian lantai 213.84 m3 #NAME? #NAME? #NAME?
E PEKERJAAN KUSEN
1 Pemasangan kembali Kusen Pintu Eksisting + Daun Pintu 5.00 unit #NAME? #NAME? #NAME? #NAME? #NAME?
2 Pemasangan kembali Kusen kisi-kisi eksisting 17.00 Bh #NAME? #NAME? #NAME? #NAME? #NAME?
4 Pasang daun pintu WPC uk. 0.95 x 2.1m (P1) 1.00 Bh #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME? 70%
#NAME? ### #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME?
5 Pemasangan Pintu PVC area KM/WC 1.00 Bh #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME?
G PEKERJAAN LANGIT-LANGIT
1 Pasang langit-langit Kalsiboard 6 mm + Rangka Holow 534.60 m2 #NAME? #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME? #NAME?
H PEKERJAAN PENGECATAN
1 Cat dinding weathershield Eksterior 346.80 m2 #NAME? #NAME? #NAME? #NAME? #NAME?
2 Cat dinding dalam 698.20 m2 #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME? 60%
#NAME? ### #NAME? ### #NAME? #NAME? #NAME?
### ###
#NAME? ### #NAME? ### #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME?
J PEKERJAAN LAIN-LAIN
1 Pasang railling tangga besi hollow 20x40mm & 50x50mm 8.35 m2 #NAME? #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME? #NAME?
II LANTAI 2
A PEKERJAAN PASANGAN DAN PLESTERAN
1 Pasang dinding bata ringan tb 10cm + Semen Instant 407.38 m2 #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME?
3 Plesteran Dinding Bata Ringan dengan semen instant 814.76 m2 #NAME? #NAME? #NAME? #NAME?
4 Plesteran 1PC : 5PS (pasir biasa) area penebalan kolom 23.04 m2 #NAME? #NAME? #NAME? #NAME? 40%
5 Acian dengan semen instant 837.80 m2 #NAME? #NAME? #NAME? #NAME?
6 Benangan Sudut dan openingan kusen 1,381.60 m' #NAME? #NAME? #NAME? #NAME?
Page 69 of 83
#NAME? ### #NAME? ### #NAME? #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME? #NAME?
4 Beton plat lantai beton tb 8 cm (Begesting bondek + tul Wiremesth) 53.46 m3 #NAME? #NAME? #NAME? #NAME?
5 Beton plat canopy tebal 8 cm 1.10 m3 #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME?
D PEKERJAAN KUSEN
1 Pasang kusen alumunium 4 putih 299.00 m' #NAME? #NAME? #NAME? #NAME? #NAME?
4 Pasang daun pintu WPC uk. 0.90 x 2.1m (P1) 8.00 Bh #NAME? #NAME? #NAME? #NAME? #NAME?
5 Pasang daun pintu WPC uk. 0.90 x 2.1m (P3) 2.00 Bh #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME?
6 Pasang daun pintu PVC KM/WC 3.00 Bh #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME?
F PEKERJAAN LANGIT-LANGIT
1 Pasang langit-langit Kalsiboard 6 mm + rangka Hollow 558.90 m2 #NAME? #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME? #NAME?
G PEKERJAAN PENGECATAN
1 Cat dinding weathershild sisi luar 356.44 m2 #NAME? #NAME? #NAME? #NAME?
2 Cat dinding dalam 671.96 m2 #NAME? #NAME? #NAME? #NAME?
3 Cat plafond 638.03 m2 #NAME? #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME?
### ###
#NAME? ### #NAME? ### #NAME? #NAME? #NAME? 10%
#NAME? ### #NAME? ### #NAME? #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME?
### ###
#NAME? ### #NAME? ### #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME? #NAME?
#NAME? ### #NAME? ### #NAME? #NAME? #NAME?
I PEKERJAAN LAIN-LAIN
#NAME? ### #NAME? ### #NAME? #NAME? #NAME?
1 Pasang railling pembatas besi hollow 20x40mm & 50x50mm lt. 2 39.20 m2 #NAME? #NAME?
0 0 - 0.00 #VALUE! #VALUE!
0%
#NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #VALUE!
KUMULATIF #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
Page 70 of 83
Nomor : 001/SPH/PKJ-PEMPROV/II/2019 Surabaya, 22 Juni 2021
Lampiran : 1 (Satu) Bendel
Kepada Yth.
Kelompok Kerja Pemilihan 120 Bagian Pengadaan Barang / Jasa
Biro Administrasi Pembangunan Sekretariat Daerah
Provinsi Jawa Timur
Jl. Pahlwan 116, Surabaya
Rp 5,907,193,392.90
TERBILANG :
Lima milyar sembilan ratus tujuh juta seratus sembilan puluh tiga ribu rupiah
Penawaran ini sudah memperhatikan ketentuan dan persyaratan yang tercantum dalam Dokumen Pengadaan
untuk melaksanakan pekerjaan tersebut
Jangka waktu pelaksanaan pekerjaan selama 120 (Seratus Dua Puluh) hari kalender sesuai dengan yang tercantum
dalam dokumen lelang
Penawaran ini berlaku 60 (Enam Puluh hari) kalender sejak batas akhir pemasukan Dokumen Penawaran
Dengan disampaikannya Surat Penawaran ini, maka kami menyatakan sanggup dan akan tunduk
pada semua ketentuan yang tercantum dalam Dokumen Pemilihan serta Pokja Pemilihan tidak terikat untuk
menetapkan penawaran terendah sebagai pemenang. Apabila dana dalam dokumen anggaran yang telah disahkan
tidak tersedia atau tidak cukup tersedia dalam DIPA/DPA Tahun Anggaran, maka Pengadaan Barang/Jasa
dapat dibatalkan dan kami tidak akan menuntut ganti rugi dalam bentuk apapun.
Kontraktor Pelaksana
PT. NAHENDRA PUTRA
A TENAGA KERJA
1 Mandor
2 Kepala Tukang Besi
3 Kepala Tukang Batu
4 Kepala Tukang Listrik
5 Kepala Tukang Cat
6 Kepala Tukang Aluminium
7 Tukang Besi
8 Tukang Batu
9 Tukang Listrik
10 Tukang Cat
11 Tukang Aluminium
12 Pekerja
13 Operator Alat Konstruksi
14 Pembantu Operator
Page 72 of 83
B ALAT KERJA
1 SCAFFOLDING
2 MESIN LAS 24A, 6.8 KvA
3 ORDINARY TRUCK
4 BETON MOLEN
5 POMPA AIR
6 BAR CUTTER/MESIN POTONG
Page 73 of 83
SCHEDULE MATERIAL KERJA
Kegiatan : PEKERJAAN RENOVASI GEDUNG ALKES FARMASI RSPAL dr. RAMELAN TA.2021
Lokasi : RSPAL dr. RAMELAN TA.2021
Tahun anggaran : 2021
C MATERIAL KERJA
1 Alluminium Profil Kusen 4"
2 Alluminium Slimar Profil Kusen 3/8"
3 Air
4 Angkur Bolt M-19 p=50 Cm
5 Atap metal sheet motif genteng bertabur pasir
6 Batu Bata 5x11x22 Cm
7 Batu Alam Alur
8 Batu Kali Belah
9 Batu Pecah Mesin
10 Batu Pecah Mesin
11 Besi Profil (Baja Konstruksi) (Ispat Indo, Hanil)
12 Besi Tulangan/Besi Beton (Polos/Ulir)
13 Bevel Kaca 5mm
14 Cat Tembok Weather Shield
15 Cat Dasar Alkali Resisting Primer
16 Cat Tembok
17 Cat Besi
18 Cat Coating Batu alur
19 Wood Filler
20 Closed Duduk Monoblok Porcelain
21 Dolken/Kayu Gelam
22 Dempul Tembok
23 Daun Pintu Alluminium
24 Daun pintu WPC uk. 0.90 x 2.1m (P1)
25 Daun pintu WPC uk. 0.90 x 2.1m (P3)
26 Daun pintu PVC
27 Engsel Stainless Steel 4"
28 Engsel Stainless Steel 3"
29 Electrode Baja
30 Floordrain/Avour Stainlish
31 Grendel/Slot Alluminium
32 Gypsum Board (120x240x9) mm
33 Galvalume C0,75mm
34 Granit Alam
35 Reng Galvalume C70 tb 0,7mm + Usuk galvalume tb 0,4mm
36 Hak Angin
37 Hollow Galvalume 2/4
38 Hollow Galvalume 4/4
39 Hollow Besi 6/6
40 Hollow Besi 4/4
41 Hollow Besi 4/2
42 Besi Galvalum Ø 5 Cm
43 Besi Siku L 40x40x4
44 Jet Shower (Toto, Amstad, Halmar)
45 Jarum keras M16
46 Kaca Polos 5mm
47 Kaca Cermin 5mm
48 Kertas Gosok
49 Kuas
50 Granite tile lantai 60x60
51 Granite tile lantai 60x60 Unpolished
52 Granite tile lantai 40x40 Unpolished
53 Granite tile lantai 20x50 Gelap
54 Granite tile lantai 20x50 Terang
55 Keramik Step Nosling 5x60 Cm
56 Kayu Meranti Papan 2/20, 4/10
57 Kayu Meranti Usuk 4/6, 5/7
58 Kayu Meranti Balok 6/15, 6/12, 8/12
59 Kawat Beton
60 Kayu Meranti Bekisting
61 Kayu Kamper Balok 2/3, 3/5
62 Kayu Kamper Balok 4/6, 5/7
63 Kayu Kamper Slimar
64 Handle Pintu
65 Kalsiboard (120x240x3,5) mm
66 Kalsiplank lb = 20 Cm
67 Kalsiplank lb = 30 Cm
68 Kabel NYY 4 x 16 mm
69 Kabel NYM 2x2,5mm
70 Kabel NYM 3x2,5mm
71 Instalasi pipa refregant
72 Pipa listrik 20mm
73 T Doos Pvc
74 Fiting Plafon
75 Isolator
76 Kran Air Stainlish
77 Kunci Silinder Pintu
78 Kunci Besar 2x putar
79 Kisi-kisi aluminium
80 List Plafond Alluminium U 1/2
81 Lampu RMI 2x18 Watt
82 Lampu Down Light LED 5 watt
83 Lampu Down Light LED 11 watt
84 Lampu LED strip batang 11 watt
85 AC Ceiling cased 2PK
86 Exhoustfan 5"
87 Penangkal petir Radius 50 meter + suport pipa besi
88 Kabel NYY 1x70 mm
89 Kabel BC 50 mm
90 Ground penangkal petir panjang 6 m
91 Lampu obstruction light + instalasi
92 Lem Kayu
93 Meni Besi
94 Minyak Bekisting
95 Mur Baut M-19
96 Mur Baut M-12
97 Plamuur
98 Pasir Urug
99 Pasir Pasang/Plester (ex Mojokerto)
100 Pasir Cor/Beton (ex Lumajang)
101 Paku Reng/Usuk
102 Plywood 122x244x9mm
103 Plat Baja
104 Pipa PVC Ø 1/2" AW
Page 74 of 83
105 Pipa PVC Ø 3/4" AW
106 Pipa PVC Ø 1" AW
107 Pipa PVC Ø 2" D
108 Pipa PVC Ø 3" D
109 Pipa PVC Ø 4" D
110 Pipa PVC Ø 5" D
111 Pipa GIP 2,5"
112 Paku Triplek/Eternit
113 Paku Klem (No 4) / Beton
114 Paku Sumbat
115 Roof Drain (Toto, Amstad, Onda)
116 Ramset
117 Semen PC 50 Kg
118 Semen PC 40 Kg
119 Semen Portland
120 Semen Instant
121 Semen Warna
122 Sirtu
123 Stop Kontak 1 Phase
124 Saklar Ganda/Double
125 Saklar Tunggal
126 Sekrup u/ U-PVC
127 Skrup Fisher
128 Skrup Drailling
129 Sealent
130 Teakwood
131 Tandon Air Steinlish 1.100 Liter
132 Talang Galvalume L=60cm tb 0,3mm
133 Urinoir
134 Waterproofing/coating
135 Washtafel
136 Wiremesh M10-150
137 Wiremesh M8-150
138 Wuwung/Jurai Genteng Galvalume bertabur pasir
139 Wallpaper
140 Lem Wallpaper
141 Bok Panel 80 x 60 x 20 cm
142 MCCB 3P 32-60A/16 KA
143 MCCB 3P 32A/10kA
144 MCB 1P 20A/6kA
145 MCB 1P 16A/6kA
146 MCB 1P 10A/6kA
147 MCB 1P 6A/6kA
148 MCB 1P 4A/6kA
149 Fuse lamp
150 Pilot Lamp RST
151 Busbar
152 Arrester PF 3P+N65kA
153 Grounding BC 10 mm2+Pipa 1/2"
154 Grounding BC 6 mm2+Pipa 1/2"
155 Kabel NYY 4 X 4 mm ex Supreme
156 Pompa Air Bersih Jet Pump termasuk presure switch
Page 75 of 83
REKAPITULASI PERHITUNGAN TKDN
Kegiatan : PEKERJAAN RENOVASI GEDUNG ALKES FARMASI RSPAL dr. RAMELAN TA.2021
Lokasi : RSPAL dr. RAMELAN TA.2021
Tahun anggaran : 2,021.00
TKDN
Uraian Barang Total Barang/Jasa Gabungan
DN LN
Rp. % KDN % %
I. Barang
1. Material Langsung (barang jadi) Rp 2,953,596,696.45 0.00 Rp 2,953,596,696.45 100.00 100.00 55.00
2. Peralatan (barang jadi) Rp 537,017,581.17 0.00 Rp 537,017,581.17 100.00 100.00 10.00
B UPAH
1 Mandor Oh
2 Kepala Tukang Oh
3 Tukang Oh
4 Pekerja Oh
5 Operator Alat Konstruksi Oh
6 Pembantu Operator Oh
C SEWA PERALATAN
1 Tower Crane / Mobile crane unit
2 Molen 350 L unit
3 Scafolding set
4 Mobil Pick Up unit
5 Dump truck 8m3 unit
6 Tangki solar 5000 liter unit
7 Tile cutter machine manual unit
8 Waterpass / Theodolite unit
9 Mesin Las unit
10 Genset 3,5 KVA unit
11 Lampu penerangan 80 w-500w unit
12 Laser Line unit
13 concrete vibrator unit
14 Stemper unit
15 Bor Listrik unit
TIME SCHEDULE
Kegiatan PEKERJAAN RENOVASI GEDUNG ALKES FARMASI RSPAL dr. RAMELAN TA.2021
Lokasi RSPAL dr. RAMELAN TA.2021
Tahun anggaran 2021
MINGGU KE
PROGRESS
NO URAIAN PEKERJAAN
% M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 M16 M17 M18
I. LANTAI 1
A PEKERJAAN PERSIAPAN 2.38% 1.190% 1.190%
B PEKERJAAN TANAH 1.35% 0.673% 0.673%
C PEKERJAAN PASANGAN DAN PLESTERAN 1.27% 0.127% 0.127% 0.127% 0.127% 0.127% 0.127% 0.127% 0.127% 0.127% 0.127%
D PEKERJAAN BETON DAN BAJA 10.58% 1.058% 1.058% 1.058% 1.058% 1.058% 1.058% 1.058% 1.058% 1.058% 1.058%
E PEKERJAAN KUSEN 0.47% 0.156% 0.156% 0.156%
F PEKERJAAN PENUTUP LANTAI DAN DINDING 1.21% 0.302% 0.302% 0.302% 0.302%
G PEKERJAAN LANGIT-LANGIT 1.08% 0.270% 0.270% 0.270% 0.270%
H PEKERJAAN PENGECATAN 0.51% 0.129% 0.129% 0.129% 0.129%
I PEKERJAAN PENGGANTUNG DAN PENGUNCI 0.23% 0.076% 0.076% 0.076%
J PEKERJAAN LAIN-LAIN 0.09% 0.045% 0.045%
II LANTAI 2
A PEKERJAAN PASANGAN DAN PLESTERAN 2.67% 0.267% 0.267% 0.267% 0.267% 0.267% 0.267% 0.267% 0.267% 0.267% 0.267%
B PEKERJAAN BETON DAN BAJA 14.05% 1.562% 1.562% 1.562% 1.562% 1.562% 1.562% 1.562% 1.562% 1.562%
C PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 18.88% 4.721% 4.721% 4.721% 4.721%
D PEKERJAAN KUSEN 1.46% 0.488% 0.488% 0.488%
E PEKERJAAN PENUTUP LANTAI DAN DINDING 1.51% 0.377% 0.377% 0.377% 0.377%
F PEKERJAAN LANGIT-LANGIT 1.13% 0.282% 0.282% 0.282% 0.282%
G PEKERJAAN PENGECATAN 0.80% 0.199% 0.199% 0.199% 0.199%
H PEKERJAAN PENGGANTUNG DAN PENGUNCI 0.33% 0.109% 0.109% 0.109%
I PEKERJAAN LAIN-LAIN 0.42% 0.210% 0.210%
J PEKERJAAN MEP 5.58% 0.558% 0.558% 0.558% 0.558% 0.558% 0.558% 0.558% 0.558% 0.558% 0.558%
IV GEDUNG PERBEKALAN
A PEKERJAAN TANAH 2.32% 1.161% 1.161%
B PEKERJAAN BETON 7.51% 1.879% 1.879% 1.879% 1.879%
C PEKERJAAN PASANGAN 1.39% 0.464% 0.464% 0.464%
D PEKERJAAN PENUTUP DINDING/ LANTAI 3.70% 0.925% 0.925% 0.925% 0.925%
E PEKERJAAN KUSEN/ PLAFOND/ PARTISI 3.13% 1.042% 1.042% 1.042%
F PEKERJAAN BESI/ KUNCI/ PENGGANTUNG 0.37% 0.184% 0.184%
G PEKERJAAN PENGECATAN 0.81% 0.270% 0.270% 0.270%
H PEKERJAN BAJA 1.37% 0.687% 0.687%
I PEKERJAAN RANGKA ATAP DAN PENUTUP ATAP 9.87% 1.646% 1.646% 1.646% 1.646% 1.646% 1.646%
J PEKERJAAN INSTALASI PANEL LISTRIK 3.52% 0.352% 0.352% 0.352% 0.352% 0.352% 0.352% 0.352% 0.352% 0.352% 0.352%
100.00% 1.190% 1.863% 3.293% 3.781% 6.054% 4.893% 4.893% 6.490% 6.257% 5.570% 10.291% 8.999% 9.057% 10.933% 5.728% 5.571% 4.098% 1.036%
1.190% 3.053% 6.346% 10.128% 16.182% 21.076% 25.969% 32.459% 38.717% 44.287% 54.577% 63.577% 72.634% 83.567% 89.295% 94.866% 98.964% 100.000%
1 SUTONO, ST UNIVERSITAS MUHAMADIYAH MALANG MANAJER PELAKSANA AHLI TEKNIK BANGUNAN 5 tahun
TEKNIK SIPIL ( S1) PROYEK GEDUNG - MADYA
4 JULI 2002
2 DONI TISNA HARIADI, ST INSTITUT TEKNOLOGO NASIONAL MALANG MANAJER TEKNIK AHLI MANAJEMEN 3 Tahun
TEKNIK SIPIL ( S1) KONTRUKSI -MADYA
27 AGUSTUS 2011
3 DESY RATNASARI, SE SEKOLAH TINGGI ILMU EKONOMI INDOCAKTI MANAJER KEUANGAN - 3 Tahun
AKUTANSI
6 APRIL 2017
4 DWI SASMITO, ST UNIVERSITAS MUHAMADIYAH MALANG PETUGAS K3 KONTRUKSI AHLI K-3 KONSTRUKSI 3 Tahun
TEKNIK SIPIL ( S1) MADYA
5-Apr-03
1 DJAMIL, ST UNIVERSITAS 17 AGUSTUS 1945 SBY PELAKSANA LAPANGAN PELAKSANA BANGUNAN 3 Tahun
TEKNIK SIPIL (S1) GEDUNG /PEKERJAAN
14 AGUSTUS 1995 GEDUNG - KELAS III
2 DENY HERMANTO, Amd UNIVERSITAS NEGERI MALANG DRAFTER / JURU GAMBAR JURU GAMBAR /DRAFTMAN 3 Tahun
TEKNIK SIPIL (D3) ARSITEKTUR -KELAS I
3 RUDI HARDJANTO, ST UNIVERSITAS DR SOETOMO - SBY ESTIMATOR ESTIMATOR /BIAYA JALAN 3 Tahun
TEKNIK SIPIL (S1)
12 JUNI 1997
4 NOOR HENDRIYANI, ST UNIVERSITAS 17 AGUSTUS 1945 SBY QUANTITY SURVEYOR QUANTITY SURVEYOR 3 Tahun
TEKNIK SIPIL (S1)
9 MARET 2000