I PEKERJAAN PERSIAPAN
A MOBILASAI / DEMOB DAN AKOMODASI PEKERJA Rp 25,000,000
SuB Total PERSIAPAN Rp 25,000,000
II LANTAI 1
A PEKERJAAN GALIAN DAN URUGAN Rp 1,911,014
B PEKERJAAN PASANGAN DAN PLESTERAN Rp 90,830,188
C PEKERJAAN BETON Rp 29,989,243
D PEKERJAAN PINTU DAN JENDELA Rp -
E PEKERJAAN PLAFOND Rp 37,982,022
F PEKERJAAN PENUTUP LANTAI DAN DINDING Rp 102,517,102
G PEKERJAAN CAT Rp 36,288,023
Sub Total LANTAI 1 Rp 299,517,593
III LANTAI 2
A PEKERJAAN PASANGAN DAN PLESTERAN Rp 100,899,078
B PEKERJAAN BETON Rp 61,974,494
C PEKERJAAN PINTU DAN JENDELA Rp -
D PEKERJAAN PLAFOND Rp 59,917,720
E PEKERJAAN PENUTUP LANTAI DAN DINDING Rp 64,443,942
F PEKERJAAN CAT Rp 34,125,272
G PEKERJAAN PENUTUP ATAP Rp 6,087,068
H PEKERJAAN LAIN LAIN Rp 43,057,954
I PEKERJAAN INTERIOR Rp 6,677,444
J PEKERJAAN SANITARI Rp 20,600,000
K VEGETASI INDOOR Rp -
Sub Total LANTAI 2 Rp 397,782,973
VIII PAGAR KELILING
VIII.A PAGAR DEPAN (A)
A PEKERJAAN GALIAN DAN URUGAN Rp 1,743,155
B PEKERJAAN PASANGAN DAN PLESTERAN Rp 20,492,609
C PEKERJAAN BETON Rp 4,779,059
D PEKERJAAN PENUTUP LANTAI DAN DINDING Rp 1,534,000
E PEKERJAAN CAT Rp 770,952
F PEKERJAAN PINTU Rp -
G PEKERJAAN LAIN-LAIN Rp -
Sub Total PAGAR DEPAN (A) Rp 29,319,775
JUMLAH TOTAL Rp 751,620,340
DIBULATKAN Rp 751,620,000
NO. URAIAN PEKERJAAN HARGA
ARSITEKTURAL
HARGA
TOTAL HARGA PROGRES HARGA PROGRES
NO. URAIAN PEKERJAAN VOLUME SAT. SATUAN
(Rp)
(Rp)
II LANTAI 1
A PEKERJAAN GALIAN DAN URUGAN
1 Galian Tanah kansteen pot tanaman 0.55 m3 Rp 20,000 Rp 10,917 0% Rp -
2 Galian tanah ramp difabel 4.96 m3 Rp 20,000 Rp 99,220 50% Rp 49,610
3 Galian tanah bawah rollag bata, tangga masuk gedung 2.45 m3 Rp 20,000 Rp 48,985 90% Rp 44,087
4 Galian Tanah pondasi batu kali (atas tie beam, area kamar mandi belakang) 11.42 m3 Rp 20,000 Rp 228,410 50% Rp 114,205
5 Pasir urug bawah kerb tanaman, depan pilar bangunan utama t=10 cm 0.99 m3 Rp 20,000 Rp 19,740 0% Rp -
6 Pasir urug bawah rollag bata, selasar bangunan 3.54 m3 Rp 20,000 Rp 70,720 0% Rp -
7 Pasir urug bawah rollag bata, tangga masuk gedung dan selasar depan t=4 cm 1.98 m3 Rp 20,000 Rp 39,605 50% Rp 19,803
8 Pasir urug bawah ramp difabel, t=10cm 4.67 m3 Rp 20,000 Rp 93,300 50% Rp 46,650
9 Pasir urug bawah pondasi batu kali (atas tie beam, area toilet belakang), t= 10 cm 2.28 m3 Rp 20,000 Rp 45,682 50% Rp 22,841
10 Urugan tanah peninggian lantai, pada selasar bangunan 44.20 m3 Rp 20,000 Rp 884,000 0% Rp -
11 Urugan tanah peninggian lantai, diatas tie beam 16.58 m3 Rp 20,000 Rp 331,520 50% Rp 165,760
12 Urugan kembali galian tanah 3.89 m3 Rp 10,000 Rp 38,915 50% Rp 19,458
C PEKERJAAN BETON
1 Kolom praktis 11x11 cm 690.80 m1 Rp 23,000 Rp 15,888,400 95% Rp 15,093,980
2 Balok latai 11x11 cm 297.80 m1 Rp 30,000 Rp 8,934,000 100% Rp 8,934,000
3 Ring balok 11x11 cm 238.45 m1 Rp 30,000 Rp 7,153,500 95% Rp 6,795,825
4 Rabat beton tebal 6 cm 169.93 m1 Rp 117,000 Rp 19,882,161 0% Rp -
5 Topi-topi beton tebal 8 cm Rp -
- Wiremesh M6 1.06 kg Rp 1,500 Rp 1,590.48 95% Rp 1,511
- Begesting, 2 kali pemakaian 14.78 m2 Rp 75,000 Rp 1,108,440 95% Rp 1,053,018
-Cor beton, mutu 7,4 Mpa 0.96 m3 Rp 117,000 Rp 112,545 95% Rp 106,917
6 Meja wastafel tebal 8 cm Rp -
- Wiremesh M6 0.21 kg Rp 1,500 Rp 312.831 0% Rp -
- Begesting, 2 kali pemakaian 2.91 m2 Rp 75,000 Rp 217,875 0% Rp -
-Cor beton, mutu 7,4 Mpa 0.24 m3 Rp 117,000 Rp 27,671 0% Rp -
7 Kolom precast (4 pilar utama), terpasang 4.00 bh Rp 2,162,000 Rp 8,648,000 0% Rp -
Termasuk : Rp -
- Kolom ornamen Rp -
- Umpak Kolom ornamen Rp -
- finishing cat Rp -
Rp -
Sub Total PEKERJAAN BETON Rp 61,974,494 Rp 31,985,251
D PEKERJAAN PINTU DAN JENDELA
1 Pintu 1 (P1) 4.00 unit Rp - Rp - Rp -
2 pintu 2 (P2) 14.00 unit Rp - Rp - Rp -
3 Pintu 3 (P3) 32.00 unit Rp - Rp - Rp -
4 Pintu 4 (P4) 11.00 unit Rp - Rp - Rp -
5 pintu 5 (P5) 6.00 unit Rp - Rp - Rp -
6 Pintu 6 (P6) 2.00 unit Rp - Rp - Rp -
7 Pintu 7 (P7) 2.00 unit Rp - Rp - Rp -
8 Pintu 8 (P8) 2.00 unit Rp - Rp - Rp -
9 Pintu 9 (P9) 1.00 unit Rp - Rp - Rp -
10 Pintu 10 (P10) 1.00 unit Rp - Rp - Rp -
11 Pintu 11 (P11) 1.00 unit Rp - Rp - Rp -
12 Pintu s (Ps) 1.00 unit Rp - Rp - Rp -
13 Jendela 1 (J1) 18.00 unit Rp - Rp - Rp -
14 Jendela 3 (J3) 2.00 unit Rp - Rp - Rp -
15 Boven 1 (BV 1) 4.00 unit Rp - Rp - Rp -
16 Boven 2 (BV 2) 2.00 unit Rp - Rp - Rp -
17 Boven 3 (BV 3) 7.00 unit Rp - Rp - Rp -
18 Boven 4 (BV 4) 3.00 unit Rp - Rp - Rp -
19 Boven 5 (BV 5) 9.00 unit Rp - Rp - Rp -
20 Boven 6 (BV 6) 16.00 unit Rp - Rp - Rp -
21 Boven 7 (BV 7) 2.00 unit Rp - Rp - Rp -
22 Boven 8 (BV 8) 9.00 unit Rp - Rp - Rp -
23 Boven 9 (BV 9) 1.00 unit Rp - Rp - Rp -
25 Partisi 1 (PR 1) 2.00 unit Rp - Rp - Rp -
26 Partisi 1.1 (PR 1.1) 3.00 unit Rp - Rp - Rp -
27 Partisi 2 (PR 2) 2.00 unit Rp - Rp - Rp -
28 Partisi 2.1 (PR 2.1) 2.00 unit Rp - Rp - Rp -
29 Partisi 3 (PR 3) 1.00 unit Rp - Rp - Rp -
30 Partisi 4 (PR 4) 1.00 unit Rp - Rp - Rp -
31 Partisi 4.1 (PR 4.1) 2.00 unit Rp - Rp - Rp -
32 Partisi 6 (PR 6) 1.00 unit Rp - Rp - Rp -
33 Partisi 8 (PR 8) 1.00 unit Rp - Rp - Rp -
HARGA
TOTAL HARGA PROGRES HARGA PROGRES
NO. URAIAN PEKERJAAN VOLUME SAT. SATUAN
(Rp)
(Rp)
2 Rangka plafond metal furing 40x40 mm dan 20x40mm + penggantung 1144.69 m2 Rp 32,000 Rp 36,630,032 80% Rp 29,304,026
3 Pekerjaan plafond gypsum WR( Water Resistant) tebal 9 mm (Area toilet dan eksterior) 326.92 m2 Rp 8,000 Rp 2,615,336 Rp -
4 Rangka plafond metal furing 40x40 mm dan 20x40mm + penggantung 326.92 m2 Rp 32,000 Rp 10,461,344 0% Rp -
2 Rangka plafond metal furing 40x40 mm dan 20x40mm + penggantung 987.87 m2 Rp 32,000 Rp 31,611,776 Rp -
3 Pekerjaan plafond gypsum WR( Water Resistant) tebal 9 mm dengan hollow 40x40 mm d 362.94 m2 Rp 8,000 Rp 2,903,520 Rp -
4 Rangka plafond metal furing 40x40 mm dan 20x40mm + penggantung 362.94 m2 Rp 32,000 Rp 11,614,080 Rp -
- Cor beton kosong pada fasad ACP, Mutu 7,4 Mpa 1.95 m3 Rp 117,000 Rp 228,122 Rp -
Rp -
Sub Total PEKERJAAN PENUTUP LANTAI DAN DINDING Rp 64,443,942 Rp -
F PEKERJAAN CAT Rp -
1 Cat dinding eksterior 564.23 m2 Rp 6,000 Rp 3,385,350 Rp -
2 Cat dinding interior 2182.80 m2 Rp 6,000 Rp 13,096,794 Rp -
3 Cat Waterprofing 571.87 m2 Rp 6,000 Rp 3,431,190 Rp -
4 Cat Plafond 1350.81 m2 Rp 6,000 Rp 8,104,848 Rp -
5 Screding 571.87 m2 Rp 10,000 Rp 5,718,650 Rp -
6 Cat lisplank 64.74 m2 Rp 6,000 Rp 388,440 Rp -
Rp -
Sub Total PEKERJAAN CAT Rp 34,125,272 Rp -
G PEKERJAAN PENUTUP ATAP Rp -
1 Pekerjaan penutup atap Trimdek Optima 0,35 BMT colourbond 1166.26 m2 Rp -
- Pas. dinding bata 1/2 batu, camp 1pc : 5ps (peninggian atap) 179.18 m2 Rp 30,000 Rp 5,375,280 100% Rp 5,375,280
- Kolom praktis 11x11 cm 44.80 m1 Rp 23,000 Rp 1,030,400 100% Rp 1,030,400
- Ring Balok 11x11 cm 232.97 m1 Rp 30,000 Rp 6,989,100 100% Rp 6,989,100
2 Rangka Atap Baja ringan 1166.26 m2 Rp - Rp -
3 Pekerjaan Bubble insulation 1166.26 m2 Rp - Rp -
4 Pekerjaan Roof mesh M4 1166.26 m2 Rp - Rp -
5 Pekerjaan Flashing 40.58 m1 Rp - Rp -
6 Bubungan atap Trimdek Optima 0,35 BMT colourbond 168.13 m1 Rp - Rp -
7 Lisplank GRC motif kayu lebar 30 cm 217.00 m1 Rp - Rp -
8 Pekerjaan atap Skylight Rp -
- Pas. dinding bata 1/2 batu, camp 1pc : 5ps (peninggian skylight) 38.40 m2 Rp 30,000 Rp 1,152,000 Rp -
- Pas. Dinding roster 15x30 cm 1.35 m2 Rp 35,000 Rp 47,250 Rp -
- Kolom praktis 11x11 cm 12.80 m1 Rp 23,000 Rp 294,400 Rp -
- Ring Balok 11x11 cm 48.60 m1 Rp 30,000 Rp 1,458,000 Rp -
- Atap Skylight kaca tampred laminated 10 mm 63.92 m2 Rp 30,000 Rp 1,917,600 Rp -
- Rangka hollow 40x40x2 mm atap skylight 608.91 kg Rp 2,000 Rp 1,217,818 Rp -
Rp -
Sub Total PEKERJAAN PENUTUP ATAP Rp 19,481,848 Rp 13,394,780
H PEKERJAAN LAIN LAIN Rp -
1 Dinding void dan tangga Rp -
- Pas. dinding bata 1/2 batu, camp 1pc : 5ps 51.94 m2 Rp 30,000 Rp 1,558,242 Rp -
- Plesteran dinding camp 1pc : 5ps 110.38 m2 Rp 28,000 Rp 3,090,513 Rp -
- Acian dinding 110.38 m2 Rp 22,000 Rp 2,428,260 Rp -
- Sponengan 115.37 m1 Rp 15,000 Rp 1,730,535 Rp -
2 Railling void, pipa stainless steel 2'" dan 1" 64.45 m2 Rp 72,000 Rp 4,640,544 Rp -
3 Hand railling tangga 26.11 m1 Rp 14,000 Rp 365,540 Rp -
4 Railling ramp difabel, pipa stainless steel 2" 116.02 m2 Rp 72,000 Rp 8,353,152 Rp -
5 Lattering Acrylic tebal 3 mm, tinggi 30 cm, fasad depan 1.00 unit Rp 950,000 Rp 950,000 Rp -
6 Logo Pengadilan Negeri Muko- Muko 1.00 unit Rp - Rp - Rp -
7 Tactile line, VID granite 300x300 mm 149.00 bh Rp 13,000 Rp 1,937,000 Rp -
8 Tactile dot, VID granite 300x300 mm 80.00 bh Rp 13,000 Rp 1,040,000 Rp -
9 Pekerjaan profil GRC cetak tebal 9 mm, fasade 39.31 m2 Rp 264,000 Rp 10,377,101 Rp -
- Rangka hollow 40x40x2 mm, fasad 3293.53 kg Rp 2,000 Rp 6,587,067 Rp -
Rp -
Sub Total PEKERJAAN LAIN LAIN Rp 43,057,954 Rp -
HARGA
TOTAL HARGA PROGRES HARGA PROGRES
NO. URAIAN PEKERJAAN VOLUME SAT. SATUAN
(Rp)
(Rp)
I PEKERJAAN INTERIOR Rp -
1 Backdrop Lobby Rp -
-Multiplek tebal 9 mm 34.56 m2 Rp - Rp -
- Rangka hollow 20x40 mm 20.71 m2 Rp - Rp -
- Penutup backdrop HPL motif kayu 20.71 m2 Rp - Rp -
- Multiplek Logo PN Muko-Muko tebal 18 mm 1.00 unit Rp - Rp -
- Lattering Acrylic 3 mm warna putih susu 1.00 unit Rp - Rp -
2 Meja Lobby Rp -
-Multiplek tebal 9 mm 61.40 m2 Rp - Rp -
-Penutup backdrop HPL motif kayu 36.06 m2 Rp - Rp -
3 Backdrop Ruang Sidang Utama Rp -
-Multiplek tebal 9 mm 120.76 m2 Rp - Rp -
- Rangka hollow 20x40 mm 62.87 m2 Rp - Rp -
-Penutup backdrop HPL motif kayu 46.32 m2 Rp - Rp -
- Logo Garuda 1.00 unit Rp - Rp -
4 Backdrop Ruang Sidang Pidana Rp -
-Multiplek tebal 9 mm 109.15 m2 Rp - Rp -
- Rangka hollow 20x40 mm 66.13 m2 Rp - Rp -
-Penutup backdrop HPL motif kayu 71.40 m2 Rp - Rp -
- Logo Garuda 1.00 unit Rp - Rp -
5 Backdrop Ruang Sidang Perdata Rp -
-Multiplek tebal 9 mm 109.15 m2 Rp - Rp -
- Rangka hollow 20x40 mm 66.13 m2 Rp - Rp -
-Penutup backdrop HPL motif kayu 71.40 m2 Rp - Rp -
- Logo Garuda 1.00 unit Rp - Rp -
6 Stage ruang sidang utama, pidana dan perdata Rp -
- Urugan tanah peninggian lantai stage 21.72 m3 Rp 15,000 Rp 325,874 Rp -
- Pas. dinding bata 1/2 batu, camp 1pc : 5ps 6.84 m2 Rp 30,000 Rp 205,275 Rp -
- Lantai vynil tebal 3 mm 97.01 m2 Rp 59,000 Rp 5,723,295 Rp -
7 Pekerjaan bangku ruang tahanan Rp -
- Pas. batu belah camp 1pc:5ps, bangku 3.60 m2 Rp 126,000 Rp 453,600 50% Rp 226,800
- Plesteran camp 1pc : 5ps 8.50 m2 Rp 25,000 Rp 212,500 50% Rp 106,250
- Acian beton 8.50 m2 Rp 17,000 Rp 144,500 50% Rp 72,250
- Sponengan 11.80 m1 Rp 3,000 Rp 35,400 50% Rp 17,700
b LANTAI 2 Rp -
1 Closed jongkok 2.00 bh Rp 170,000 Rp 340,000 Rp -
2 Closed duduk 10.00 bh Rp 250,000 Rp 2,500,000 Rp -
3 Jet washer 12.00 bh Rp 95,000 Rp 1,140,000 Rp -
4 Urinoir 2.00 bh Rp 150,000 Rp 300,000 Rp -
5 Sekat urinoir 2.00 bh Rp 325,000 Rp 650,000 Rp -
6 Wastafel dinding 4.00 bh Rp 170,000 Rp 680,000 Rp -
7 Wastafel meja 5.00 bh Rp 170,000 Rp 850,000 Rp -
8 Cermin 9.00 bh Rp 240,000 Rp 2,160,000 Rp -
9 kran air 12.00 bh Rp 34,000 Rp 408,000 Rp -
10 Kran wastafel 9.00 bh Rp 34,000 Rp 306,000 Rp -
11 Bak toilet fiber (untuk r. tahanan) 2.00 bh Rp 92,000 Rp 184,000 Rp -
12 Floor drain 12.00 bh Rp 7,000 Rp 84,000 Rp -
13 Hand dryer 2.00 bh Rp 170,000 Rp 340,000 Rp -
14 Tissue Holder 10.00 bh Rp 42,000 Rp 420,000 Rp -
Rp -
Sub Total PEKERJAAN SANITARI Rp 20,600,000 Rp -
K VEGETASI INDOOR Rp -
1 Tanaman Monstera 8.00 pot Rp -
2 Tanaman Sansevieria 8.00 pot Rp -
3 Tanaman Peach lily 8.00 pot Rp -
4 Tanaman Bromelia Red 8.00 pot Rp -
5 Tanaman Kucai mini 32.00 m2 Rp -
- Media Tanam tebal 30 cm 16.20 m3 Rp -
6 Batu Tabur Putih 22.00 m2 Rp -
Rp -
Sub Total VEGETASI INDOOR
VIII PAGAR KELILING
VIII.A PAGAR DEPAN (A)
A PEKERJAAN GALIAN DAN URUGAN
1 Galian Tanah pondasi batu pecah 52.30 m3 Rp 25,000 Rp 1,307,575 95% Rp 1,242,196
2 Urugan pasir bawah pondasi batu pecah 4.79 m3 Rp 20,000 Rp 95,836 95% Rp 91,044
3 Urugan pasir bawah Batu Candi tempel tebal 10 cm 0.89 m3 Rp 20,000 Rp 17,760 95% Rp 16,872
4 Urugan kembali galian pondasi 26.83 m3 Rp 12,000 Rp 321,984 95% Rp 305,884
I PEKERJAAN PERSIAPAN
A MOBILASAI / DEMOB DAN AKOMODASI PEKERJA los Rp 25,000,000 Rp 25,000,000 3.3261% 1.6631% 1.6631%
Sub Total Pekerjaan Persiapan Rp 25,000,000 3.3261% 1.6631% 1.6631%
II LANTAI 1
A PEKERJAAN GALIAN DAN URUGAN 0.0796% 0.0071% 0.0021% 0.0049% 0.0656%
1 Galian Tanah kansteen pot tanaman 0.55 m3
2 Galian tanah ramp difabel 4.96 m3
3 Galian tanah bawah rollag bata, tangga masuk gedung 2.45 m3
4 Galian Tanah pondasi batu kali (atas tie beam, area kamar mandi belakang) 11.42 m3
7 Pasir urug bawah rollag bata, tangga masuk gedung dan selasar depan t=4 1.98 m3 Rp 15,000 Rp 29,704 0.0040% 0.0040%
cm
8 Pasir urug bawah ramp difabel, t=10cm 4.67 m3 Rp 15,000 Rp 69,975 0.0093% 0.0093%
Pasir urug bawah pondasi batu kali (atas tie beam, area toilet belakang), t= 0.0046%
9 2.28 m3 Rp 15,000 Rp 34,262 0.0046%
10 cm
10 Urugan tanah peninggian lantai, pada selasar bangunan 44.20 m3 Rp 15,000 Rp 663,000 0.0882% 0.0882%
11 Urugan tanah peninggian lantai, diatas tie beam 16.58 m3 Rp 15,000 Rp 248,640 0.0331% 0.0331%
12 Urugan kembali galian tanah 3.89 m3 Rp 7,500 Rp 29,186 0.0039% 0.0039%
4 Pas. pondasi batu kali (atas tie beam, area kamar mandi belakang) =(mt - 8.16 m2 Rp 126,000 Rp 1,027,845 0.1368%
0,77) 0.1368%
5 Pasangan rollag bata pot tanaman 1.43 m3 Rp 22,000 Rp 31,350 0.0042% 0.0042%
6 Pas. batu belah camp 1pc:5ps, ramp difabel 20.65 m3 Rp 126,000 Rp 2,602,341 0.3462% 0.3462%
7 Pas. dinding bata 1/2 batu, camp 1pc : 5ps 1113.71 m2 Rp 22,000 Rp 24,501,521 3.2598% 0.6520% 0.6520% 0.6520% 0.6520% 0.6520%
8 Pas.trasram, campuran 1pc : 3ps 573.15 m2 Rp 22,000 Rp 12,609,370 1.6776% 0.3355% 0.3355% 0.3355% 0.3355% 0.3355%
9 Penebalan dinding bata 1/2 batu pada fasad, camp 1pc:5 ps 260.10 m2 Rp 22,000 Rp 5,722,200 0.7613% 0.1903% 0.1903% 0.1903% 0.1903%
10 Pas. Dinding batu telur 15.96 m2 Rp 59,000 Rp 941,640 0.1253% 0.0626% 0.0626%
11 Pas. Dinding roster 15x30 cm 1.58 m2 Rp 22,000 Rp 34,650 0.0046% 0.0046%
12 Plesteran dinding camp 1pc : 5ps 3373.72 m2 Rp 25,000 Rp 84,342,933 11.2215% 2.2443% 2.2443% 2.2443% 2.2443% 2.2443%
13 Plesteran beton camp 1pc : 3ps 782.01 m2 Rp 25,000 Rp 19,550,350 2.6011% 0.5202% 0.5202% 0.5202% 0.5202% 0.5202%
14 Acian dinding 4155.73 m2 Rp 17,000 Rp 70,647,433 9.3994% 3.1331% 3.1331% 3.1331%
15 Sponengan 1097.27 m1 Rp 3,000 Rp 3,291,810 0.4380% 0.4380%
16 Tali air 769.76 m1 Rp 3,000 Rp 2,309,280 0.3072% 0.3072%
Rp 230,684,220 30.6916% 1.5047% 1.5047% 5.2145% 5.2145% 6.0072% 4.5025% 4.2216% 0.7927% 0.8881% 5.2933% 5.0810% 6.5422%
C PEKERJAAN BETON 3.5636% 0.4101% 0.4101% 0.8206% 0.8206% 0.4105% 0.0740% 0.0149% 0.6026%
1 Kolom praktis 11x11 cm 690.80 m1 Rp 17,000 Rp 11,743,600 1.5624% 0.3906% 0.3906% 0.3906% 0.3906%
2 Balok latai 11x11 cm 297.80 m1 Rp 22,000 Rp 6,551,600 0.8717% 0.2179% 0.2179% 0.2179% 0.2179%
3 Ring balok 11x11 cm 238.45 m1 Rp 22,000 Rp 5,245,900 0.6979% 0.1745% 0.1745% 0.1745% 0.1745%
4 Rabat beton tebal 6 cm 169.93 m1 Rp 104,000 Rp 17,673,032 2.3513% 0.7838% 0.7838% 0.7838%
5 Topi-topi beton tebal 8 cm
- Wiremesh M6 1.06 kg Rp 1,500 Rp 1,590 0.0002% 0.0002%
- Begesting, 2 kali pemakaian 14.78 m2 Rp 65,000 Rp 960,648 0.1278% 0.1278%
-Cor beton, mutu 7,4 Mpa 0.96 m3 Rp 104,000 Rp 100,040 0.0133% 0.0133%
6 Meja wastafel tebal 8 cm
- Wiremesh M6 0.21 kg Rp 1,500 Rp 313 0.0000% 0.0000%
- Begesting, 2 kali pemakaian 2.91 m2 Rp 65,000 Rp 188,825 0.0251% 0.0251%
-Cor beton, mutu 7,4 Mpa 0.24 m3 Rp 104,000 Rp 24,596 0.0033% 0.0033%
7 Kolom precast (4 pilar utama), terpasang 4.00 bh Rp 2,162,000 Rp 8,648,000 1.1506% 1.1506%
Termasuk :
- Kolom ornamen
- Umpak Kolom ornamen
- finishing cat
Rp 51,138,144 6.8037% 0.7830% 0.7830% 1.5668% 1.5668% 0.7838% 0.1413% 0.0284% 1.1506%
D PEKERJAAN PINTU DAN JENDELA 7.9876% 4.9447% 2.2028% 0.8401%
1 Pintu 1 (P1) 4.00 unit 0.0000% 0.0000% 0.0000%
2 pintu 2 (P2) 14.00 unit
3 Pintu 3 (P3) 32.00 unit
4 Pintu 4 (P4) 11.00 unit 0.0000% 0.0000% 0.0000%
5 pintu 5 (P5) 6.00 unit 0.0000% 0.0000% 0.0000%
6 Pintu 6 (P6) 2.00 unit 0.0000% 0.0000% 0.0000%
7 Pintu 7 (P7) 2.00 unit 0.0000% 0.0000% 0.0000%
8 Pintu 8 (P8) 2.00 unit 0.0000% 0.0000% 0.0000%
9 Pintu 9 (P9) 1.00 unit 0.0000% 0.0000% 0.0000%
10 Pintu 10 (P10) 1.00 unit 0.0000% 0.0000% 0.0000%
11 Pintu 11 (P11) 1.00 unit 0.0000% 0.0000% 0.0000%
12 Pintu s (Ps) 1.00 unit 0.0000% 0.0000% 0.0000%
13 Jendela 1 (J1) 18.00 unit 0.0000% 0.0000% 0.0000% 0.0000%
14 Jendela 3 (J3) 2.00 unit 0.0000% 0.0000%
15 Boven 1 (BV 1) 4.00 unit 0.0000% 0.0000% 0.0000%
16 Boven 2 (BV 2) 2.00 unit 0.0000% 0.0000%
17 Boven 3 (BV 3) 7.00 unit 0.0000% 0.0000%
18 Boven 4 (BV 4) 3.00 unit 0.0000% 0.0000%
19 Boven 5 (BV 5) 9.00 unit 0.0000% 0.0000%
20 Boven 6 (BV 6) 16.00 unit 0.0000% 0.0000% 0.0000% 0.0000%
21 Boven 7 (BV 7) 2.00 unit 0.0000% 0.0000%
22 Boven 8 (BV 8) 9.00 unit 0.0000% 0.0000% 0.0000%
23 Boven 9 (BV 9) 1.00 unit 0.0000% 0.0000%
25 Partisi 1 (PR 1) 2.00 unit 0.0000% 0.0000%
26 Partisi 1.1 (PR 1.1) 3.00 unit 0.0000% 0.0000%
27 Partisi 2 (PR 2) 2.00 unit 0.0000% 0.0000%
28 Partisi 2.1 (PR 2.1) 2.00 unit 0.0000% 0.0000%
29 Partisi 3 (PR 3) 1.00 unit 0.0000% 0.0000%
30 Partisi 4 (PR 4) 1.00 unit 0.0000% 0.0000%
31 Partisi 4.1 (PR 4.1) 2.00 unit 0.0000% 0.0000%
32 Partisi 6 (PR 6) 1.00 unit
33 Partisi 8 (PR 8) 1.00 unit
2 Rangka plafond metal furing 40x40 mm dan 20x40mm + penggantung 1144.69 m2 Rp 40,000 Rp 45,787,540 6.0918% 2.0306% 2.0306% 2.0306%
Pekerjaan plafond gypsum WR( Water Resistant) tebal 9 mm (Area toilet 0.1160% 0.1160% 0.1160%
3
dan eksterior)
326.92 m2 Rp 8,000 Rp 2,615,336 0.3480%
4 Rangka plafond metal furing 40x40 mm dan 20x40mm + penggantung 326.92 m2 Rp 40,000 Rp 13,076,680 1.7398% 0.5799% 0.5799% 0.5799%
5 Pekerjaan plafond expose compound beton 30.25 m2 Rp 8,000 Rp 241,968 0.0322% 0.0161% 0.0161%
6 Rangka plafond metal furing 40x40 mm dan 20x40mm + penggantung 30.25 m2 Rp 40,000 Rp 1,209,840 0.1610% 0.0805% 0.0805%
7 Pekerjaan plafond PVC motif kayu 62.24 m2 Rp 8,000 Rp 497,920 0.0662% 0.0331% 0.0331%
8 Rangka plafond metal furing 40x40 mm dan 20x40mm + penggantung 62.24 m2 Rp 40,000 Rp 2,489,600 0.3312% 0.1656% 0.1656%
Rp 184,268,261 24.5161% 1.3861% 4.5363% 5.3174% 3.9313% 0.7811% 2.6733% 2.6733% 3.2173%
B PEKERJAAN BETON 1.0346% 0.5173% 0.5173%
1 Kolom praktis 11x11 cm 412.13 m1 Rp 17,000 Rp 7,006,125 0.9321% 0.4661% 0.4661%
2 Balok latai 11x11 cm 203.50 m1 Rp 22,000 Rp 4,477,000 0.5956% 0.2978% 0.2978%
3 Ring Balok 11x11 cm 152.90 m1 Rp 22,000 Rp 3,363,800 0.4475% 0.2238% 0.2238%
1 Pekerjaan plafond gypsum tebal 9 mm dengan rangka holow 40x40 mm dan 987.87 m2 Rp 8,000 Rp 7,902,944 1.0515%
20x40 mm 0.5257% 0.5257%
2 Rangka plafond metal furing 40x40 mm dan 20x40mm + penggantung 987.87 m2 Rp 40,000 Rp 39,514,720 5.2573% 2.6286% 2.6286%
3 Pekerjaan plafond gypsum WR( Water Resistant) tebal 9 mm dengan hollow 362.94 m2 Rp 8,000 Rp 2,903,520 0.3863%
40x40 mm dan 20x40 mm (Area kamar mandi dan eksterior) 0.3863%
4 Rangka plafond metal furing 40x40 mm dan 20x40mm + penggantung 362.94 m2 Rp 40,000 Rp 14,517,600 1.9315%
1.9315%
5 Shadow line 980.90 m1 Rp 3,000 Rp 2,942,700 0.3915% 0.3915%
- Cor beton kosong pada fasad ACP, Mutu 7,4 Mpa 1.95 m3 Rp 104,000 Rp 202,775 0.0270% 0.0270%
1 1166.26 m2
Pekerjaan penutup atap Trimdek Optima 0,35 BMT colourbond
- Pas. dinding bata 1/2 batu, camp 1pc : 5ps (peninggian atap) 179.18 m2 Rp 22,000 Rp 3,941,872 0.5244% 0.5244%
- Kolom praktis 11x11 cm 44.80 m1 Rp 17,000 Rp 761,600 0.1013% 0.1013%
- Ring Balok 11x11 cm 232.97 m1 Rp 22,000 Rp 5,125,340 0.6819% 0.6819%
2 Rangka Atap Baja ringan 1166.26 m2
3 Pekerjaan Bubble insulation 1166.26 m2
4 Pekerjaan Roof mesh M4 1166.26 m2
5 Pekerjaan Flashing 40.58 m1
6 Bubungan atap Trimdek Optima 0,35 BMT colourbond 168.13 m1
7 Lisplank GRC motif kayu lebar 30 cm 217.00 m1
8 Pekerjaan atap Skylight
b LANTAI 2
1 Closed jongkok 2.00 bh Rp 154,000 Rp 308,000 0.0410% 0.0410%
2 Closed duduk 10.00 bh Rp 236,000 Rp 2,360,000 0.3140% 0.1570% 0.1570%
3 Jet washer 12.00 bh Rp 86,000 Rp 1,032,000 0.1373% 0.1373%
4 Urinoir 2.00 bh Rp 138,000 Rp 276,000 0.0367% 0.0367%
5 Sekat urinoir 2.00 bh Rp 312,000 Rp 624,000 0.0830% 0.0830%
6 Wastafel dinding 4.00 bh Rp 154,000 Rp 616,000 0.0820% 0.0820%
7 Wastafel meja 5.00 bh Rp 154,000 Rp 770,000 0.1024% 0.1024%
8 Cermin 9.00 bh Rp 240,000 Rp 2,160,000 0.2874% 0.2874%
9 kran air 12.00 bh Rp 26,000 Rp 312,000 0.0415% 0.0415%
10 Kran wastafel 9.00 bh Rp 26,000 Rp 234,000 0.0311% 0.0311%
11 Bak toilet fiber (untuk r. tahanan) 2.00 bh Rp 72,000 Rp 144,000 0.0192% 0.0192%
12 Floor drain 12.00 bh Rp 7,000 Rp 84,000 0.0112% 0.0112%
13 Hand dryer 2.00 bh Rp 150,000 Rp 300,000 0.0399% 0.0399%
14 Tissue Holder 10.00 bh Rp 30,000 Rp 300,000 0.0399% 0.0399%
Rp -
IV POS SATPAM
A PEKERJAAN GALIAN DAN URUGAN 0.0127% 0.0127%
1 Galian Tanah pondasi batu pecah 12.11 m3
2 Urugan pasir bawah pondasi batu pecah 1.09 m3 Rp 15,000 Rp 16,380 0.0022% 0.0022%
3 Urugan pasir bawah lantai tebal 10 cm 1.28 m3 Rp 15,000 Rp 19,245 0.0026% 0.0026%
4 Urugan pasir bawah rollag tebal 10 cm 2.72 m3 Rp 15,000 Rp 40,800 0.0054% 0.0054%
5 Urugan tanah peninggian peil lantai 2.42 m3 Rp 15,000 Rp 36,329 0.0048% 0.0048%
6 Urugan kembali galian pondasi 9.34 m3 Rp 7,500 Rp 70,038 0.0093% 0.0093%
Rp - 0.0000% 0.0000%
E PEKERJAAN PENUTUP LANTAI DAN DINDING 0.1490% 0.0702% 0.0788%
1 Pemasangan keramik polos uk. 30x30 cm polish, warna putih 21.64 m2 Rp 31,000 Rp 670,840 0.0893% 0.0446% 0.0446%
2 Pemasangan keramik rustic uk 30x30 cm, Toilet 2.14 m2 Rp 31,000 Rp 66,340 0.0088% 0.0044% 0.0044%
3 Pemasangan dinding keramik 30x30 cm polos, Toilet 22.10 m2 Rp 31,000 Rp 685,100 0.0911% 0.0456% 0.0456%
4 Pemasangan Batu Bulat, fasad pos satpam 10.04 m2 Rp 59,000 Rp 592,272 0.0788% 0.0394% 0.0394%
5 Plint lantai keramik tile 10x30 cm polish 20.70 m2 Rp 6,000 Rp 124,200 0.0165% 0.0165%
2 Rangka plafond metal furing 40x40 mm dan 20x40mm + penggantung 6.94 m2 Rp 40,000 Rp 277,400 0.0369% 0.0369%
Pekerjaan plafond gypsum WR( Water Resistant) tebal 9 mm rangka hollow 0.0149%
3
2/4 mm dan 4/4 mm (Area kamar mandi dan eksterior)
14.00 m2 Rp 8,000 Rp 111,984 0.0149%
4 Rangka plafond metal furing 40x40 mm dan 20x40mm + penggantung 14.00 m2 Rp 40,000 Rp 559,920 0.0745% 0.0745%
Rp -
H PEKERJAAN CAT 0.0456% 0.0456%
1 Cat dinding eksterior 36.35 m2 Rp 8,000 Rp 290,794 0.0387% 0.0387%
2 Cat dinding interior 24.54 m2 Rp 8,000 Rp 196,354 0.0261% 0.0261%
3 Cat Plafond 20.93 m2 Rp 8,000 Rp 167,464 0.0223% 0.0223%
Rp - 0.0000% 0.0000%
E PEKERJAAN PENUTUP LANTAI DAN DINDING 0.0086% 0.0086%
1 Finishing Floor hardener 20.51 m2 Rp 6,000 Rp 123,060 0.0164% 0.0164%
Rp - 0.0000% 0.0000%
E PEKERJAAN PENUTUP LANTAI DAN DINDING 0.1121% 0.0539% 0.0582%
1 Pemasangan keramik polos 30x30 cm, warna putih 10.31 m2 Rp 31,000 Rp 319,610 0.0425% 0.0213% 0.0213%
2 Pemasangan keramik dinding polos 30x30 cm, warna putih 39.60 m2 Rp 31,000 Rp 1,227,600 0.1633% 0.0817% 0.0817%
3 Finishing Floor Hardener 10.31 m2 Rp 6,000 Rp 61,860 0.0082% 0.0082%
3 Paving block tebal 8 cm uk. 10x20 cm dan 10x10 cm, landscape 1603.15 m2 Rp 56,000 Rp 89,776,400 11.9444%
2.9861% 2.9861% 2.9861% 2.9861%
- Urugan pasir bawah paving block landscape tebal 4 cm 64.13 m3 Rp 15,000 Rp 961,890 0.1280% 0.0320% 0.0320% 0.0320% 0.0320%
- Urugan sirtu bawah paving block tebal 12 cm 192.38 m3 Rp 15,000 Rp 2,885,670 0.3839% 0.0960% 0.0960% 0.0960% 0.0960%
4 Paving block 20x10x8 cm 230.27 m2 Rp 56,000 Rp 12,895,120 1.7156% 0.5719% 0.5719% 0.5719%
- Urugan sirtu bawah paving block tebal 20 cm 23.03 m3 Rp 15,000 Rp 345,405 0.0460% 0.0153% 0.0153% 0.0153%
- Urugan pasir bawah paving block tebal 4 cm 4.61 m3 Rp 15,000 Rp 69,081 0.0092% 0.0031% 0.0031% 0.0031%
- Pas. dinding bata 1/2 batu, camp 1pc : 5ps 12.10 m2 Rp 22,000 Rp 266,112 0.0354% 0.0177% 0.0177%
- Pas. rollag bata, camp 1pc : 6ps 15.12 m2 Rp 22,000 Rp 332,640 0.0443% 0.0221% 0.0221%
5 Grass block 408.00 m2 Rp 44,000 Rp 17,952,000 2.3884% 1.1942% 1.1942%
- Pekerjaan tanaman "Rumput Gajah Mini" tertanam kerapatan
408.00 m2
standar
- Pekerjaan media tanam subur 61.20 m3
5 Kansteen beton ukuran 60x14x30 cm 437.37 m1 Rp 44,000 Rp 19,244,280 2.5604% 1.2802% 1.2802%
- Galian tanah kansteen beton 3.06 m3
- Urug pasir bawah kansteen beton 6.12 m3 Rp 15,000 Rp 91,848 0.0122% 0.0061% 0.0061%
6 Car Stoper, beton precast 48.00 m Rp 44,000 Rp 2,112,000 0.2810% 0.2810%
7 Cat marka logo difabel 6.90 m2 Rp 8,000 Rp 55,200 0.0073% 0.0073%
8 Tiang bendera custom, terpasang dengan asesoris 1.00 unit #REF! #REF! #REF! #REF!
- Pas rollag bata 1/2 batu , camp 1pc : 5ps 11.86 m2 Rp 22,000 Rp 260,920 0.0347% 0.0347%
- Plesteran dinding camp 1pc : 5ps 14.62 m2 Rp 25,000 Rp 365,500 0.0486% 0.0486%
- Acian dinding 14.62 m2 Rp 17,000 Rp 248,540 0.0331% 0.0331%
9 Pintu samping kiri bangunan (P1) 1.00 Unit
- Galian tanah pondasi cor kosong , Kolom pintu 0.43 m3
- Urug pasir bawah pondasi 0.03 m3 Rp 15,000 Rp 405 0.0001% 0.0001%
- Cor beton, mutu 12,2 Mpa 0.41 m3 Rp 104,000 Rp 42,120 0.0056% 0.0056%
- Begesting 5.40 m2 Rp 65,000 Rp 351,000 0.0467% 0.0467%
10 Pintu samping kanan bangunan (P2) 1.00 Unit
- Galian tanah pondasi cor kosong , Kolom pintu 0.58 m3
- Urug pasir bawah pondasi 0.04 m3 Rp 15,000 Rp 540 0.0001% 0.0001%
- Cor beton, mutu 12,2 Mpa 0.54 m3 Rp 104,000 Rp 56,160 0.0075% 0.0075%
- Begesting 7.20 m2 Rp 65,000 Rp 468,000 0.0623% 0.0623%
ARSITEKTURAL
I PEKERJAAN PERSIAPAN
A MOBILASAI / DEMOB DAN AKOMODASI PEKERJA 1 3.326% 1.66% 1.66%
II LANTAI 1
A PEKERJAAN GALIAN DAN URUGAN
5 Pasir urug bawah kerb tanaman, depan pilar bangunan utama 0.99 0.0020%
t=10 cm 0.00%
6 Pasir urug bawah rollag bata, selasar bangunan 3.54 0.0071% 0.01%
Pasir urug bawah rollag bata, tangga masuk gedung dan selasar
7 1.98 0.0040%
depan t=4 cm 0.00%
8 Pasir urug bawah ramp difabel, t=10cm 4.67 0.0093% 0.01%
Pasir urug bawah pondasi batu kali (atas tie beam, area toilet
9 2.28 0.0046% 0.00%
belakang), t= 10 cm
10 Urugan tanah peninggian lantai, pada selasar bangunan 44.20 0.0882% 0.09%
11 Urugan tanah peninggian lantai, diatas tie beam 16.58 0.0331% 0.03%
12 Urugan kembali galian tanah 3.89 0.0039% 0.00%
Sub Total PEKERJAAN GALIAN DAN URUGAN 0.1520% 0.01% 0.00% 0.01% 0.13%
B PEKERJAAN PASANGAN DAN PLESTERAN
1 Pas. pondasi rollag bata tangga masuk 93.38 0.2733% 0.14% 0.14%
2 Pas. pondasi rollag bata keliling selasar bangunan 44.20 0.1294% 0.06% 0.06%
3 Pas. pondasi rollag bata peninggian di kamar mandi 2.04 0.0060% 0.01%
4 Pas. pondasi batu kali (atas tie beam, area kamar mandi belakang) 8.16 0.1368%
=(mt -0,77) 0.14%
5 Pasangan rollag bata pot tanaman 1.43 0.0042% 0.00%
6 Pas. batu belah camp 1pc:5ps, ramp difabel 20.65 0.3462% 0.35%
7 Pas. dinding bata 1/2 batu, camp 1pc : 5ps 1113.71 3.2598% 0.65% 0.65% 0.65% 0.65% 0.65%
8 Pas.trasram, campuran 1pc : 3ps 573.15 1.6776% 0.34% 0.34% 0.34% 0.34% 0.34%
9 Penebalan dinding bata 1/2 batu pada fasad, camp 1pc:5 ps 260.10 0.7613% 0.19% 0.19% 0.19% 0.19%
10 Pas. Dinding batu telur 15.96 0.1253% 0.06% 0.06%
11 Pas. Dinding roster 15x30 cm 1.58 0.0046% 0.00%
12 Plesteran dinding camp 1pc : 5ps 3373.72 11.2215% 2.24% 2.24% 2.24% 2.24% 2.24%
13 Plesteran beton camp 1pc : 3ps 782.01 2.6011% 0.52% 0.52% 0.52% 0.52% 0.52%
14 Acian dinding 4155.73 9.3994% 3.13% 3.13% 3.13%
15 Sponengan 1097.27 0.4380% 0.44%
16 Tali air 769.76 0.3072% 0.31%
Sub Total PEKERJAAN PASANGAN DAN PLESTERAN 30.6916% 0.0099 0.0099 0.0342 0.0342 0.0394 0.0295 0.0277 0.0052 0.0058 0.0347 0.0333 0.0429
C PEKERJAAN BETON
1 Kolom praktis 11x11 cm 690.80 1.5624% 0.39% 0.39% 0.39% 0.39%
2 Balok latai 11x11 cm 297.80 0.8717% 0.22% 0.22% 0.22% 0.22%
3 Ring balok 11x11 cm 238.45 0.6979% 0.17% 0.17% 0.17% 0.17%
4 Rabat beton tebal 6 cm 169.93 2.3513% 0.78% 0.78% 0.78%
5 Topi-topi beton tebal 8 cm
- Wiremesh M6 1.06 0.0002% 0.00%
- Begesting, 2 kali pemakaian 14.78 0.1278% 0.13%
-Cor beton, mutu 7,4 Mpa 0.96 0.0133% 0.01%
6 Meja wastafel tebal 8 cm
- Wiremesh M6 0.21 0.0000% 0.00%
- Begesting, 2 kali pemakaian 2.91 0.0251% 0.03%
-Cor beton, mutu 7,4 Mpa 0.24 0.0033% 0.00%
7 Kolom precast (4 pilar utama), terpasang 4.00 1.1506% 1.15%
Termasuk :
- Kolom ornamen
- Umpak Kolom ornamen
- finishing cat
Sub Total PEKERJAAN BETON 6.8037% 0.78% 0.78% 1.57% 1.57% 0.78% 0.14% 0.03% 1.15%
D PEKERJAAN PINTU DAN JENDELA
1 Pintu 1 (P1) 4.00 0.6998% 0.35% 0.35%
2 pintu 2 (P2) 14.00
3 Pintu 3 (P3) 32.00
4 Pintu 4 (P4) 11.00 0.5722% 0.29% 0.29%
5 pintu 5 (P5) 6.00 0.2922% 0.15% 0.15%
6 Pintu 6 (P6) 2.00 0.3159% 0.16% 0.16%
7 Pintu 7 (P7) 2.00 0.2185% 0.11% 0.11%
8 Pintu 8 (P8) 2.00 0.7424% 0.37% 0.37%
9 Pintu 9 (P9) 1.00 0.2314% 0.12% 0.12%
10 Pintu 10 (P10) 1.00 0.2014% 0.10% 0.10%
11 Pintu 11 (P11) 1.00 0.0319% 0.02% 0.02%
12 Pintu s (Ps) 1.00 0.0816% 0.04% 0.04%
13 Jendela 1 (J1) 18.00 3.0941% 1.03% 1.03% 1.03%
14 Jendela 3 (J3) 2.00 0.0303% 0.03%
15 Boven 1 (BV 1) 4.00 0.1623% 0.08% 0.08%
16 Boven 2 (BV 2) 2.00 0.1160% 0.12%
17 Boven 3 (BV 3) 7.00 0.4675% 0.47%
18 Boven 4 (BV 4) 3.00 0.1696% 0.17%
19 Boven 5 (BV 5) 9.00 0.7376% 0.74%
20 Boven 6 (BV 6) 16.00 1.7179% 0.57% 0.57% 0.57%
21 Boven 7 (BV 7) 2.00 0.2669% 0.27%
22 Boven 8 (BV 8) 9.00 1.6536% 0.83% 0.83%
23 Boven 9 (BV 9) 1.00 0.2270% 0.23%
25 Partisi 1 (PR 1) 2.00 0.4540% 0.45%
26 Partisi 1.1 (PR 1.1) 3.00 1.1719% 1.17%
27 Partisi 2 (PR 2) 2.00 0.7791% 0.78%
28 Partisi 2.1 (PR 2.1) 2.00 0.3749% 0.37%
29 Partisi 3 (PR 3) 1.00 0.1744% 0.17%
30 Partisi 4 (PR 4) 1.00 0.1788% 0.18%
31 Partisi 4.1 (PR 4.1) 2.00 0.0867% 0.09%
32 Partisi 6 (PR 6) 1.00
33 Partisi 8 (PR 8) 1.00
Sub Total PEKERJAAN PINTU DAN JENDELA 15.2500% 9.44% 4.21% 1.60%
E PEKERJAAN PLAFOND
1 Pekerjaan plafond gypsum tebal 9 mm (Indoor) 1144.69 1.2184% 0.41% 0.41% 0.41%
Rangka plafond metal furing 40x40 mm dan 20x40mm + 2.03% 2.03% 2.03%
2 1144.69 6.0918%
penggantung
Pekerjaan plafond gypsum WR( Water Resistant) tebal 9 mm 0.12% 0.12% 0.12%
3 326.92 0.3480%
(Area toilet dan eksterior)
Rangka plafond metal furing 40x40 mm dan 20x40mm + 0.58% 0.58% 0.58%
4 326.92 1.7398%
penggantung
5 Pekerjaan plafond expose compound beton 30.25 0.0322% 0.02% 0.02%
Rangka plafond metal furing 40x40 mm dan 20x40mm + 0.08% 0.08%
6 30.25 0.1610%
penggantung
7 Pekerjaan plafond PVC motif kayu 62.24 0.0662% 0.03% 0.03%
Rangka plafond metal furing 40x40 mm dan 20x40mm + 0.17% 0.17%
8 62.24 0.3312%
penggantung
9 Shadow line 1183.07 0.4722% 0.47%
Sub Total PEKERJAAN PLAFOND 10.4608% 2.44% 3.13% 3.23% 0.99% 0.67%
F PEKERJAAN PENUTUP LANTAI DAN DINDING
1 Pemasangan Keramik 60x60 cm polos, indoor 1137.55 4.3891% 2.19% 2.19%
2 Pemasangan Keramik 60x60 cm polos, Eksterior 482.15 1.8603% 0.93% 0.93%
3 Pemasangan Keramik 60x60 cm polos, Tangga 47.64 0.1838% 0.18%
4 Pemasangan Keramik 60x60 cm unpolish,toilet 73.92 0.2852% 0.29%
5 Pemasangan Keramik 60x60 cm polish, dinding toilet 407.23 1.5712% 0.79% 0.79%
6 Pemasangan Keramik motif 60x60 cm polish, indoor 46.80 0.1806% 0.18%
7 Step nosing pada tangga 207.68 0.1382% 0.14%
8 Plint lantai Keramik 10x60 cm polish 735.32 0.4892% 0.49%
Sub Total PEKERJAAN PENUTUP LANTAI DAN DINDING 9.0975% 4.38% 4.09% 0.63%
G PEKERJAAN CAT
1 Cat dinding eksterior 746.33 0.7944% 0.40% 0.40%
2 Cat dinding interior 2357.81 2.5096% 1.25% 1.25%
3 Cat plafond 1471.61 1.5663% 1.57%
4 Cat water profing 552.10 0.5876% 0.59%
5 Screding 552.10 0.9549% 0.95%
Sub Total PEKERJAAN PASANGAN DAN PLESTERAN 24.5161% 1.39% 4.54% 5.32% 3.93% 0.78% 2.67% 2.67% 3.22%
B PEKERJAAN BETON
1 Kolom praktis 11x11 cm 412.13 0.9321% 0.47% 0.47%
2 Balok latai 11x11 cm 203.50 0.5956% 0.30% 0.30%
3 Ring Balok 11x11 cm 152.90 0.4475% 0.22% 0.22%
Sub Total PEKERJAAN PENUTUP LANTAI DAN DINDING 7.9753% 2.65% 2.86% 1.46% 1.01%
F PEKERJAAN CAT
1 Cat dinding eksterior 564.23 0.6005% 0.30% 0.30%
2 Cat dinding interior 2182.80 2.3233% 1.16% 1.16%
3 Cat Waterprofing 571.87 0.6087% 0.61%
4 Cat Plafond 1350.81 1.4378% 1.44%
5 Screding 571.87 0.9891% 0.49% 0.49%
6 Cat lisplank 64.74 0.0689% 0.07%
Sub Total PEKERJAAN CAT 6.0283% 0.0049 0.0049 0.0061 0.0146 0.0297
G PEKERJAAN PENUTUP ATAP
1 1166.26
Pekerjaan penutup atap Trimdek Optima 0,35 BMT colourbond
- Pas. dinding bata 1/2 batu, camp 1pc : 5ps (peninggian atap) 179.18 0.5244% 0.52%
- Kolom praktis 11x11 cm 44.80 0.1013% 0.10%
- Ring Balok 11x11 cm 232.97 0.6819% 0.68%
2 Rangka Atap Baja ringan 1166.26
3 Pekerjaan Bubble insulation 1166.26
4 Pekerjaan Roof mesh M4 1166.26
5 Pekerjaan Flashing 40.58
6 Bubungan atap Trimdek Optima 0,35 BMT colourbond 168.13
7 Lisplank GRC motif kayu lebar 30 cm 217.00
8 Pekerjaan atap Skylight
38.40 0.1124%
- Pas. dinding bata 1/2 batu, camp 1pc : 5ps (peninggian skylight) 0.11%
- Pas. Dinding roster 15x30 cm 1.35 0.0040% 0.00%
- Kolom praktis 11x11 cm 12.80 0.0290% 0.03%
- Ring Balok 11x11 cm 48.60 0.1423% 0.14%
- Atap Skylight kaca tampred laminated 10 mm 63.92 0.2551% 0.26%
- Rangka hollow 40x40x2 mm atap skylight 608.91 0.1620% 0.16%
Sub Total PEKERJAAN LAIN LAIN 5.6910% 0.94% 1.36% 0.42% 1.13% 1.13% 0.40% 0.32%
I PEKERJAAN INTERIOR
1 Backdrop Lobby
-Multiplek tebal 9 mm 34.56 0.0598% 0.01% 0.01% 0.01% 0.01%
- Rangka hollow 20x40 mm 20.71 0.0799% 0.04% 0.04%
- Penutup backdrop HPL motif kayu 20.71 0.0937% 0.05% 0.05%
- Multiplek Logo PN Muko-Muko tebal 18 mm 1.00 0.0210% 0.02%
- Lattering Acrylic 3 mm warna putih susu 1.00 0.3540% 0.35%
2 Meja Lobby
-Multiplek tebal 9 mm 61.40 0.1062% 0.03% 0.03% 0.03% 0.03%
-Penutup backdrop HPL motif kayu 36.06 0.1631% 0.08% 0.08%
3 Backdrop Ruang Sidang Utama
-Multiplek tebal 9 mm 120.76 0.2089% 0.05% 0.05% 0.05% 0.05%
- Rangka hollow 20x40 mm 62.87 0.2426% 0.12% 0.12%
-Penutup backdrop HPL motif kayu 46.32 0.2095% 0.10% 0.10%
- Logo Garuda 1.00 0.0082% 0.01%
4 Backdrop Ruang Sidang Pidana
-Multiplek tebal 9 mm 109.15 0.1888% 0.05% 0.05% 0.05% 0.05%
- Rangka hollow 20x40 mm 66.13 0.2552% 0.13% 0.13%
-Penutup backdrop HPL motif kayu 71.40 0.3230% 0.16% 0.16%
- Logo Garuda 1.00 0.0082% 0.01%
5 Backdrop Ruang Sidang Perdata
-Multiplek tebal 9 mm 109.15 0.1888% 0.05% 0.05% 0.05% 0.05%
- Rangka hollow 20x40 mm 66.13 0.2552% 0.13% 0.13%
-Penutup backdrop HPL motif kayu 71.40 0.3230% 0.16% 0.16%
- Logo Garuda 1.00 0.0082% 0.01%
6 Stage ruang sidang utama, pidana dan perdata
- Urugan tanah peninggian lantai stage 21.72 0.0434% 0.02% 0.02%
- Pas. dinding bata 1/2 batu, camp 1pc : 5ps 6.84 0.0200% 0.02%
- Lantai vynil tebal 3 mm 97.01 0.7615% 0.25% 0.25% 0.25%
7 Pekerjaan bangku ruang tahanan
- Pas. batu belah camp 1pc:5ps, bangku 3.60 0.0603% 0.06%
- Plesteran camp 1pc : 5ps 8.50 0.0283% 0.03%
- Acian beton 8.50 0.0192% 0.02%
- Sponengan 11.80 0.0047% 0.00%
Sub Total PEKERJAAN INTERIOR 4.0347% 0.30% 0.39% 0.91% 1.08% 0.70% 0.27% 0.40%
J PEKERJAAN SANITARI
a LANTAI 1
1 Closed jongkok 7.00 0.1434% 0.07% 0.07%
2 Closed duduk 8.00 0.2512% 0.13% 0.13%
3 Jet washer 15.00 0.1716% 0.17%
4 Urinoir 2.00 0.0367% 0.04%
5 Sekat urinoir 2.00 0.0830% 0.08%
6 Wastafel dinding 5.00 0.1024% 0.10%
7 Wastafel meja 3.00 0.0615% 0.06%
8 Cermin 5.00 0.1597% 0.16%
9 kran air 15.00 0.0519% 0.05%
10 Kran wastafel 5.00 0.0173% 0.02%
11 Floor drain 15.00 0.0140% 0.01%
12 Bak kamar mandi 6.00 0.0575% 0.06%
13 Handle difabel 2.00 0.0133% 0.01%
14 Hand dryer 2.00 0.0399% 0.04%
15 Tissue Holder 8.00 0.0319% 0.03%
b LANTAI 2
1 Closed jongkok 2.00 0.0410% 0.04%
2 Closed duduk 10.00 0.3140% 0.16% 0.16%
3 Jet washer 12.00 0.1373% 0.14%
4 Urinoir 2.00 0.0367% 0.04%
5 Sekat urinoir 2.00 0.0830% 0.08%
6 Wastafel dinding 4.00 0.0820% 0.08%
7 Wastafel meja 5.00 0.1024% 0.10%
8 Cermin 9.00 0.2874% 0.29%
9 kran air 12.00 0.0415% 0.04%
10 Kran wastafel 9.00 0.0311% 0.03%
11 Bak toilet fiber (untuk r. tahanan) 2.00 0.0192% 0.02%
12 Floor drain 12.00 0.0112% 0.01%
13 Hand dryer 2.00 0.0399% 0.04%
14 Tissue Holder 10.00 0.0399% 0.04%
Sub Total PEKERJAAN PASANGAN DAN PLESTERAN 0.7832% 0.15% 0.29% 0.23% 0.11%
C PEKERJAAN BETON
1 Kolom praktis 11x11 cm 27.00 0.0611% 0.03% 0.03%
2 Balok latai 11x11 cm 6.50 0.0190% 0.01% 0.01%
3 Ring Balk 15/20
- Pembesian 92.74 0.0185% 0.01% 0.01%
- Begesting, 2 kali pemakaian 7.26 0.0628% 0.03% 0.03%
-Cor beton, mutu 12,2 Mpa 0.54 0.0075% 0.01%
4 Sloof 15/20
- Pembesian 92.74 0.0185% 0.01% 0.01%
- Begesting, 2 kali pemakaian 7.26 0.0628% 0.03% 0.03%
-Cor beton, mutu 12,2 Mpa 0.54 0.0075% 0.01%
5 List profil beton, GRC cetak 14.00 0.3278% 0.33%
Sub Total PEKERJAAN PENUTUP LANTAI DAN DINDING 0.2846% 0.13% 0.15%
F PEKERJAAN PLAFOND
Pekerjaan plafond gypsum tebal 9 mm dengan rangka hollow 2/4 0.01%
1 6.94 0.0074%
mm dan 4/4 mm
Rangka plafond metal furing 40x40 mm dan 20x40mm + 0.04%
2 6.94 0.0369%
penggantung
Pekerjaan plafond gypsum WR( Water Resistant) tebal 9 mm
3 rangka hollow 2/4 mm dan 4/4 mm (Area kamar mandi dan 14.00 0.0149% 0.01%
eksterior)
Rangka plafond metal furing 40x40 mm dan 20x40mm + 0.07%
4 14.00 0.0745%
penggantung
5 Shadow line 33.30 0.0133% 0.01%
Sub Total PEKERJAAN PASANGAN DAN PLESTERAN 0.8658% 0.13% 0.31% 0.43%
C PEKERJAAN BETON
1 Kolom praktis 11x11 cm 3.90 0.0088% 0.00% 0.00%
2 Balok latai 11x11 cm 10.77 0.0315% 0.02% 0.02%
3 Kanopi beton tebal 10 cm
- Wiremesh M5 0.70 0.0001% 0.00% 0.00%
- Begesting, 2 kali pemakaian 9.58 0.0829% 0.04% 0.04%
-Cor beton, mutu 12,2 Mpa 0.80 0.0110% 0.01%
4 Balok Kanopi 15/20
- Pembesian 71.38 0.0142% 0.01% 0.01%
- Begesting, 2 kali pemakaian 5.59 0.0483% 0.02% 0.02%
- Cor beton, mutu 12,2 Mpa 0.42 0.0058% 0.01%
Sub Total PEKERJAAN PENUTUP LANTAI DAN DINDING 0.2141% 0.10% 0.11%
F PEKERJAAN CAT
1 Cat dinding eksterior 87.45 0.0931% 0.09%
2 Cat dinding interior 67.28 0.0716% 0.07%
3 Cat Waterprofing 38.94 0.0414% 0.04%
3 Paving block tebal 8 cm uk. 10x20 cm dan 10x10 cm, landscape 1603.15 11.9444%
2.99% 2.99% 2.99% 2.99%
- Urugan pasir bawah paving block landscape tebal 4 cm 64.13 0.1280% 0.03% 0.03% 0.03% 0.03%
- Urugan sirtu bawah paving block tebal 12 cm 192.38 0.3839% 0.10% 0.10% 0.10% 0.10%
4 Paving block 20x10x8 cm 230.27 1.7156% 0.57% 0.57% 0.57%
- Urugan sirtu bawah paving block tebal 20 cm 23.03 0.0460% 0.02% 0.02% 0.02%
- Urugan pasir bawah paving block tebal 4 cm 4.61 0.0092% 0.00% 0.00% 0.00%
- Pas. dinding bata 1/2 batu, camp 1pc : 5ps 12.10 0.0354% 0.02% 0.02%
- Pas. rollag bata, camp 1pc : 6ps 15.12 0.0443% 0.02% 0.02%
5 Grass block 408.00 2.3884% 1.19% 1.19%
- Pekerjaan tanaman "Rumput Gajah Mini" tertanam kerapatan
408.00
standar
- Pekerjaan media tanam subur 61.20
5 Kansteen beton ukuran 60x14x30 cm 437.37 2.5604% 1.28% 1.28%
- Galian tanah kansteen beton 3.06
- Urug pasir bawah kansteen beton 6.12 0.0122% 0.01% 0.01%
6 Car Stoper, beton precast 48.00 0.2810% 0.28%
7 Cat marka logo difabel 6.90 0.0073% 0.01%
8 Tiang bendera custom, terpasang dengan asesoris 1.00 0.7451% 0.75%
- Pas rollag bata 1/2 batu , camp 1pc : 5ps 11.86 0.0347% 0.03%
- Plesteran dinding camp 1pc : 5ps 14.62 0.0486% 0.05%
- Acian dinding 14.62 0.0331% 0.03%
9 Pintu samping kiri bangunan (P1) 1.00
- Galian tanah pondasi cor kosong , Kolom pintu 0.43
- Urug pasir bawah pondasi 0.03 0.0001% 0.00%
- Cor beton, mutu 12,2 Mpa 0.41 0.0056% 0.01%
- Begesting 5.40 0.0467% 0.05%
10 Pintu samping kanan bangunan (P2) 1.00
- Galian tanah pondasi cor kosong , Kolom pintu 0.58
- Urug pasir bawah pondasi 0.04 0.0001% 0.00%
- Cor beton, mutu 12,2 Mpa 0.54 0.0075% 0.01%
- Begesting 7.20 0.0623% 0.06%
Sub Total PEKERJAAN LAIN LAIN 24.2318% 4.90% 4.63% 7.27% 7.44%
VIII PAGAR KELILING
VIII.A PAGAR DEPAN (A)
A PEKERJAAN GALIAN DAN URUGAN
1 Galian Tanah pondasi batu pecah 52.30
2 Urugan pasir bawah pondasi batu pecah 4.79 0.0096% 0.01%
3 Urugan pasir bawah Batu Candi tempel tebal 10 cm 0.89 0.0018% 0.00%
4 Urugan kembali galian pondasi 26.83 0.0268% 0.03%
Sub Total PEKERJAAN PASANGAN DAN PLESTERAN 1.8669% 0.16% 0.67% 1.03%
C PEKERJAAN BETON
1 Kolom praktis 11x11 cm 35.28 0.0798% 0.04% 0.04%
2 Ring Balk 15/20
- Pembesian 245.75 0.0490% 0.02% 0.02%
- Begesting, 2 kali pemakaian 19.28 0.1667% 0.08% 0.08%
-Cor beton, mutu 12,2 Mpa 1.45 0.0200% 0.01% 0.01%
3 Sloof 15/20
- Pembesian 245.75 0.0490% 0.02% 0.02%
- Begesting 19.28 0.1667% 0.08% 0.08%
- Cor beton, mutu 12,2 Mpa 1.45 0.0200% 0.01% 0.01%
1 1.00 0.0319%
Logo PN Muko-Muko Acrylic Tebal 3 mm, warna putih susu 0.03%
Lattering Acrylic "PENGADILAN NEGERI MUKO-MUKO
2 1.00 0.4292%
KELAS II tebal 3 mm, Warna putih susu 0.43%
3 Lattering Acrylic nama jalan tebal 3 mm, Warna putih susu 1.00 0.2391% 0.24%
4 Besi hollow 4x4 cm, pagar 663.17 0.1765% 0.06% 0.06% 0.06%
Pemasangan 1 m² acian
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 OH 0.0756 Rp 130,000 Rp 9,828.00
2 Tukang Batu L.02 OH 0.0378 Rp 150,000 Rp 5,670.00
3 Kepala Tukang L.03 OH 0.0038 Rp 160,000 Rp 604.80
4 Mandor L.04 OH 0.0038 Rp 180,000 Rp 680.40
JUMLAH TENAGA Rp 16,783.20
DIBULATKAN Rp 17,000.00
Pekerjaan Sponengan
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 OH 0.0108 Rp 130,000 Rp 1,400.49
2 Tukang Batu L.02 OH 0.0072 Rp 150,000 Rp 1,077.30
3 Kepala Tukang L.03 OH 0.0007 Rp 160,000 Rp 114.91
4 Mandor L.04 OH 0.0004 Rp 180,000 Rp 68.04
JUMLAH TENAGA Rp 2,660.74
DIBULATKAN Rp 3,000.00
Pemasangan 1 m² rangka besi hollow metal furing 1x20.40 mm dan 20.40 mm, modul 60 x 60 cm,
untuk plafon
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 OH 0.1323 Rp 130,000 Rp 17,199.00
2 Tukang Besi L.02 OH 0.1323 Rp 150,000 Rp 19,845.00
3 Kepala Tukang L.03 OH 0.0132 Rp 160,000 Rp 2,116.80
4 Mandor L.04 OH 0.0068 Rp 180,000 Rp 1,224.72
JUMLAH TENAGA Rp 40,385.52
DIBULATKAN Rp 40,000.00
Pemasangan 1 mʾ plint HT 10 cm x 60 cm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 OH 0.0170 Rp 130,000 Rp 2,211.30
2 Tukang Batu L.02 OH 0.0170 Rp 150,000 Rp 2,551.50
3 Kepala Tukang L.03 OH 0.0017 Rp 160,000 Rp 272.16
4 Mandor L.04 OH 0.0009 Rp 180,000 Rp 170.10
JUMLAH TENAGA Rp 5,205.06
DIBULATKAN Rp 5,000.00
Pengecatan 1 m² tembok baru (1 lapis plamuur. 1 lapis cat dasar, 2 lapis cat penutup) eksterior
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 OH 0.0113 Rp 130,000 Rp 1,474.20
2 Tukang Cat L.02 OH 0.0357 Rp 150,000 Rp 5,358.15
3 Kepala Tukang L.03 OH 0.0036 Rp 160,000 Rp 571.54
4 Mandor L.04 OH 0.0017 Rp 180,000 Rp 306.18
JUMLAH TENAGA Rp 7,710.07
DIBULATKAN Rp 8,000.00
Pengecatan 1 m² tembok baru (1 lapis plamuur. 1 lapis cat dasar, 2 lapis cat penutup) interior
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 OH 0.0113 Rp 130,000 Rp 1,474.20
2 Tukang Cat L.02 OH 0.0357 Rp 150,000 Rp 5,358.15
3 Kepala Tukang L.03 OH 0.0036 Rp 160,000 Rp 571.54
4 Mandor L.04 OH 0.0017 Rp 180,000 Rp 306.18
JUMLAH TENAGA Rp 7,710.07
DIBULATKAN Rp 8,000.00
Pengecatan 1 m² Screding
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 OH 0.0567 Rp 130,000 Rp 7,371.00
2 Tukang Batu L.02 OH 0.0284 Rp 150,000 Rp 4,252.50
3 Kepala Tukang L.03 OH 0.0028 Rp 160,000 Rp 453.60
4 Mandor L.04 OH 0.0028 Rp 180,000 Rp 510.30
JUMLAH TENAGA Rp 12,587.40
DIBULATKAN Rp 13,000.00
Pemasangan 1 m² Penutup dinding Alumunium composite panel (ACP), tebal 4 mm, alloy 0,3 mm
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 OH 0.1418 Rp 130,000 Rp 18,427.50
2 Tukang Kayu L.02 OH 0.1418 Rp 150,000 Rp 21,262.50
3 Kepala Tukang L.03 OH 0.0142 Rp 160,000 Rp 2,268.00
4 Mandor L.04 OH 0.0076 Rp 180,000 Rp 1,360.80
JUMLAH TENAGA Rp 43,318.80
DIBULATKAN Rp 43,000.00
Pemasangan 1 m² rangka besi hollow 1x20.40.2 mm, modul 60 x 120 cm, untuk partisi
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 OH 0.0945 Rp 130,000 Rp 12,285.00
2 Tukang Besi L.02 OH 0.0945 Rp 150,000 Rp 14,175.00
3 Kepala Tukang L.03 OH 0.0095 Rp 160,000 Rp 1,512.00
4 Mandor L.04 OH 0.0049 Rp 180,000 Rp 884.52
JUMLAH TENAGA Rp 28,856.52
DIBULATKAN Rp 29,000.00
Pemasangan 1 m² HPL
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 OH 0.0189 Rp 130,000 Rp 2,457.00
2 Tukang Kayu L.02 OH 0.1890 Rp 150,000 Rp 28,350.00
3 Kepala Tukang L.03 OH 0.0189 Rp 160,000 Rp 3,024.00
4 Mandor L.04 OH 0.0024 Rp 180,000 Rp 425.25
JUMLAH TENAGA Rp 34,256.25
DIBULATKAN Rp 34,000.00
DIBULATKAN Rp 44,000.00
Pengecatan 1 m² permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
1 Pekerja L.01 OH 0.1512 Rp 130,000 Rp 19,656.00
2 Tukang L.02 OH 0.2646 Rp 150,000 Rp 39,690.00
3 Kepala Tukang L.03 OH 0.0265 Rp 160,000 Rp 4,233.60
4 Mandor L.04 OH 0.0076 Rp 180,000 Rp 1,360.80
JUMLAH TENAGA Rp 64,940.40
DIBULATKAN Rp 65,000.00
1 bh Tactile VID granite 300x300 mm
Bahan:
1 bh Tactile spot Granite Rp 54,837.50 Rp 54,837.50 Rp 54,837.50
Pemasangan ( Install )
1 kg semen portland Rp 1,050.00 Rp 1,050.00
1 ls Alat bantu Rp 1,250.00 Rp 1,250.00
1 ls Upah Kerja Pemasangan Rp 15,000.00 Rp 15,000.00 Rp 17,300.00
Jumlah : Rp 72,137.50
Jasa 10% Rp 7,213.75
Jumlah total Rp 79,351.25