Anda di halaman 1dari 9

REKAPITULASI ANGGARAN BIAYA

PEKERJAAN PEMBANGUNAN GEDUNG KULIAH 4 LANTAI


IPB - BOGOR

JUMLAH HARGA
No. PEKERJAAN
(Rp)

I PEKERJAAN PERSIAPAN Rp 44,019,904.96

II PEKERJAAN STRUKTUR Rp 1,999,203,139.43


A PEKERJAAN TANAH Rp 29,801,750.75
B PEKERJAAN PONDASI Rp 416,544,582.89
C PEKERJAAN KONSTRUKSI BETON Rp 1,552,856,805.78

III PEKERJAAN ARSITEKTUR Rp 2,762,226,543.75


A PEKERJAAN DINDING Rp 642,000,515.70
B PEKERJAAN LANTAI Rp 324,735,072.80
C PEKERJAAN KUSEN LENGKAP Rp 789,502,822.45
D PEKERJAAN PENUTUP ATAP Rp 552,181,853.02
E PEKERJAAN PLAFOND Rp 262,227,791.29
F PEKERJAAN SANITAIR Rp 56,119,377.40
G PEKERJAAN PENGECATAN Rp 135,459,111.09

IV PEKERJAAN LUAR BANGUNAN Rp 73,860,691.26


A SALURAN AIR KOTOR Rp 73,860,691.26

V PEKERJAAN MEKANIKAL Rp 118,541,412.51


A PEKERJAAN INSTALASI PLAMBING Rp 91,074,795.05
B PEKERJAAN VENTILASI Rp 27,466,617.46

VI PEKERJAAN ELEKTRIKAL Rp 325,520,964.10


A PEKERJAAN PANEL DAYA DAN PENERANGAN Rp 86,096,826.14
B PEKERJAAN KABEL FEEDER Rp 38,948,457.32
C PEKERJAAN KABEL LADDER/TRAY Rp 68,875,863.47
D PEKERJAAN ARMATUR, LAMPU, SAKLAR & STOP Rp 54,503,027.58
E PEKERJAAN INSTALASI Rp 77,096,789.59

JUMLAH : Rp 5,323,372,656.00
DIBULATKAN : Rp 5,323,300,000.00
TERBILANG : Lima milyar tiga ratus dua puluh tiga juta tiga ratus ribu rupiah

Catatan :
Biaya Fisik Rp 5,323,372,656
Biaya Perencanaan Rp 182,059,345 Bogor, Mei 2008
Biaya Pengawasan Rp 122,437,571
Biaya Pengelolaan Rp 21,293,491
Jumlah Rp 5,649,163,063
Dibulatkan Rp 5,640,000,000

f:\522467212.xls\4LT
REKAPITULASI ANGGARAN PELAKSANAAN
RKB ANNABA BOARDING SCHOOL

No. PEKERJAAN HARGA TOTAL

1 MATERIAL Rp 12,546,000.00

2 UPAH KERJA #REF!

TOTAL #REF!

Keterangan :

1 Jumlah Ruangan Kelas 3 Lokal


2 Luas Bangunan 6 x 8 m2, Selasar 2 x 8 m2 / Lokal
3 Struktur Pondasi Foot Plate & Batu Kali
4 Struktur Bangunan Konstruksi Beton 3 Lantai
5 Dinding Bata Ringan
6 Kusen dan Pintu Alumunium
7 Penutup Atap Baja Ringan
8 Keramik Lantai 40 x 40

f:\522467212.xls\Rekap
BELANJA MATERIAL
RKB ANNABA BOARDING SCHOOL

HARGA SAT. JUMLAH HARGA


No. MATERIAL SAT. VOLUME
(Rp) (Rp)

1 BESI
23/06 Begel 12 (akbar) bt 30.00 67,000.00 2,010,000.00
Begel 6 (akbar) bt 50.00 22,000 1,100,000.00
24/06 Begel 12 (hegar) bt 30.00 76,000.00 2,280,000.00
4-Jul begel 12 (sentral) bt 50.00 89,000.00 bon
lbr -
lbr -
set -
Jumlah 5,390,000.00
2 CEMENT, BATA & PASIR
24/06 Batu mbl 5.00 330,000.00 1,650,000.00
4-Jul Batu mbl 2.00 330,000.00 660,000.00
29-Jun 3 Roda zak 10.00 57,000.00 570,000.00
1-Jul Merah Putih (Rahayu) zak 9.00 51,000.00 459,000.00
2-Jul Merah Putih (Rahayu) zak 10.00 51,000.00 510,000.00
5-Jul Merah Putih (Rahayu) zak 20.00 51,000.00 1,020,000.00
1-Jul Pasir truk 1.00 450,000.00 450,000.00
1-Jul Pasir Pasang truk 2.00 450,000.00 900,000.00
4-Jul pasir asang truk 1.00 450,000.00 bon
Split truk - - -
Jumlah 6,219,000.00
3 KAYU
Kaso (iid) bt 1.00 200,000.00 200,000.00
Bambu bt 1.00 100,000.00 100,000.00
Jumlah 300,000.00
4 MATERIAL TOKO
25/06 Balincong bh 2.00 65,000.00 130,000.00
25/06 Gagang Balncong bh 2.00 10,000.00 20,000.00
20/06 Doran Pacul bh 3.00 10,000.00 30,000.00
20/06 Pacul bh 3.00 30,000.00 90,000.00
20/06 Benang pak 5.00 20,000.00 100,000.00
Paku 12 (sahabat) kg 3.00 14,000.00 42,000.00
30/06 Ember bh 10.00 8,000.00 80,000.00
Gegep bh 2.00 15,000.00 30,000.00
Pengki bh 2.00 15,000.00 30,000.00
30/06 Benang bh 2.00 10,000.00 20,000.00
30/06 galon bh 3.00 5,000.00 15,000.00
Galon + isi bh 1.00 50,000.00 50,000.00
Makan minum cor ls - 900,000.00 -
Sarung tangan set - 25,000.00 -
Sepatu Boot bh - 80,000.00 -
Pengki bh - 8,000.00 -
Ongkir Molen ls - 2,000,000.00 -
Jumlah 637,000.00

JUMLAH TOTAL Rp 12,546,000.00

Hal. 3
DAFTAR HARGA MATERIAL
TAHUN ANGGARAN 2019
#REF!
HARGA SATUAN
No. BAHAN BANGUNAN SATUAN
(Rp)

1 Bahan plafond
Asbes plat 1m x 1m t. 4 mm 18,850.00 m2
Gyptile 600 x 1200 x 9 mm 20,980.00 m2
2 Bata :
Bata merah bakar kelas I 1,000.00 bh
Bata merah bakar kelas II 850.00 bh
3 Batu :
Batu belah 177,950.00 m3
Batu koral beton kali (sirtu tersaring) 200,000.00 m3
4 Besi
Besi beton U-24 rata-rata 10,500.00 kg
Besi beton U-39/U-32 rata-rata 13,000.00 kg
Besi siku 40.40.4 17,900.00 btg
5 Cat
Cat dasar 28,250.00 ltr
Cat penutup 42,900.00 kg
Cat besi glotex 39,500.00 kg
Cat kayu glotex 37,150.00 kg
Cat tembok ICI exterior 72,000.00 kg
Cat tembok ICI interrior 67,000.00 kg
Cat tembok ICI weathershield 72,000.00 kg
Cat tembok Vinilex 19,900.00 kg
Dempul kayu cap kucing 22,000.00 kg
Politur 42,470.00 ltr
Kuas 3" 14,200.00 bh
Plamir tembok Matex 19,500.00 kg
Rol cat tembok 29,200.00 bh
Meni kayu/besi Patra/Nippon (5kg) 27,300.00 gln
Terpentin 16,400.00 lt
Tiner A 21,500.00 lt
Amplas 4,600.00 lbr
6 Genteng & atap :
Genteng metal berpasir gerard 107,990.00 m2
Nok metal berpasir gerard 91,470.00 m'
Listplank dan talang Zam t=0,8mm powdercoating 246,840.00 m'
7 Hebel t. 10x20x60 9,500.00 bh
8 Injuk 15,650.00 m2
9 Kawat :
Kawat beton 24,850.00 kg
Kawat las 21,200.00 kg
10 Kayu :
Kayu balok borneo super 4,735,000.00 m3
Kayu balok kamper medan (kruing) 5,427,450.00 m3
Kayu balok kamper samarinda 7,742,500.00 m3
Kayu balok kamper singkil 6,499,500.00 m3
Kayu papan cor/papan terentang 2,407,800.00 m3
Kayu papan borneo super 5,018,200.00 m3
Kayu papan kamper medan (kruing) 5,719,350.00 m3
11 Kayu lapis :
Multiplek 12 mm 120x120 175,000.00 lbr
Multiplek 9 mm 120x120 135,600.00 lbr
Triplex 3 mm 120x240 52,200.00 lbr
Triplex 6 mm 120x240 90,900.00 lbr
Teakwood 4 mm 120x240 122,500.00 lbr
12 Keramik :
Keramik 20x20 (KM) KW1 DN corak/warna/anti slip setara Roman 57,800.00 m2
Keramik 20x20 (KM) KW1 DN putih polos setara Roman 65,350.00 m2
Keramik 20x25 dinding KM KW1 DN corak setara Roman 68,250.00 m2
Keramik 30x30 KW1 DN warna/corak (anti slip) setara Roman 68,750.00 m2
Keramik 30x30 KW1 DN putih setara Roman 61,800.00 m2
Granito Tile Essenza uk. 40 x 40 Unpolis 183,800.00 m2
Granit tile 40x40 98,700.00 m2
13 Kusen alumunium, Pintu, Jendela & Accessories :
Kusen alumunium hitam 3" Ex Alexindo 86,390.00 m'
Kusen alumunium hitam/warna 4" EX Alexindo 111,070.00 m'
Kusen pintu besi m'
Alumunium plat t. 0,2 80,700.00 m2

f:\522467212.xls\H_bahan Hal. 4
HARGA SATUAN
No. BAHAN BANGUNAN SATUAN
(Rp)
Pintu alumunium 189,900.00 m'
Pintu kayu finishing melamik 855,120.00 m2
Pintu rangka alumunium (tanpa kaca) 259,200.00 m2
Pintu plat alumunium 596,800.00 m2
Pintu besi plat type A m2
Pintu besi plat type B m2
Jendela Alumunium & penggantung 133,500.00 m'
Jalusi 497,380.00 m2
Silent 9,870.00 m'
Stoper pintu 92,560.00 bh
Door Closer Kelas Standard (Baik) 518,250.00 bh
Door Stop 35,500.00 bh
Kunci Silinder ALFA Untuk Pintu Alumunium 368,550.00 bh
Kunci 2 Slaag Lengkap EX Mayer 185,900.00 bh
Kunci pintu besi set
Rambuncis 18,510.00 bh
Tarikan Pintu Alumunium 366,500.00 bh
Handle Alumunium 309,600.00 bh
Engsel Pintu Unilon Standar Cavell (4") 18,900.00 bh
Engsel Jendela Unilon Standar Belluci (Gold) 12,300.00 bh
Engsel pintu besi bh
Casement ex Solid 129,590.00 set
Grendel pintu 15 cm 44,650.00 bh
Grendel jendela 5 cm 12,650.00 bh
Grendel pintu besi bh
Rel pintu Wina L 3,5 m 3,940,000.00 set
Dudukan rel pintu besi 550,000.00 set
Kaca rayband 5 mm 133,450.00 m2
Kaca polos 5 mm 99,550.00 m2
14 Lem :
Lem paralon 9,100.00 bh
Lem putih (Fox) 31,900.00 kg
15 Paku :
Paku 1 s/d 3 cm 22,700.00 kg
Paku 5 s/d 7 cm 19,400.00 kg
Paku 8 s/d 12 cm 19,400.00 kg
16 Partisi :
Metal stud C - 64 Galvalume 0,48 mm 17,800.00 m'
U runer U - 65 Galvalume 0,48 mm 15,450.00 m'
Corner bead 12,340.00 m'
Cornice adhesive 96,260.00 zak
Textile tape 3,880.00 m'
Paku Gypsum setara jayaboard 80.00 bh
Paku rivet steel 50.00 bh
Paku beton 1-3 cm 740.00 bh
Panel gypsum Setara JayaBoard 1200 x 2400 x 9 mm 71,550.00 lbr
17 Pasir
Pasir batu 182,500.00 m3
Pasir pasang 210,700.00 m3
Pasir urug 157,200.00 m3
Koral beton 154,850.00 m3
Batu pecah 2 - 3 cm 183,500.00 m3
Batu pecah 3 - 5 cm 174,000.00 m3
Batu pecah 10 - 15 cm 196,800.00 m3
18 Paving blok :
Paving 6 cm (1 m2 = 36 Bh) (Abu) 40,450.38 m2
Paving 6 cm (1 m2 = 36 Bh) 45,900.00 m2
19 PC/semen :
PC (50 kg) 65,100.00 zak
MU 380 - pas bata ringan/10 m2 (40 kg) 177,700.00 zak
MU 100 - plesteran/2.4 m2 (40 kg) 72,800.00 zak
MU 200 - acian/20 m2 (40 kg) 191,900.00 zak
MU 600 - kedap air/1,5 m2 (3 kg) 138,200.00 zak
Semen warma 14,600.00 kg
20 Pipa :
GIP Medium Class Φ 1/2 " 112,700.00 bt
GIP Medium Class Φ 3/4 " 158,000.00 bt
GIP Medium Class Φ 1 " 162,800.00 bt
GIP Medium Class Φ 1 1/4 " 232,600.00 bt
GIP Medium Class Φ 1 1/2 " 251,600.00 bt
GIP Medium Class Φ 2 " 419,200.00 bt

f:\522467212.xls\H_bahan Hal. 5
HARGA SATUAN
No. BAHAN BANGUNAN SATUAN
(Rp)
GIP Medium Class Φ 2 1/2 " 602,700.00 bt
GIP Medium Class Φ 3 " 762,200.00 bt
GIP Medium Class Φ 4 " 825,300.00 bt
GIP Medium Class Φ 5 " Hitam SNI 0039-87 2,164,630.00 bt
GIP Medium Class Φ 6 " Hitam SNI 0039-87 2,569,760.00 bt
PVC Wavin AW Φ1/2 " 14,100.00 bt
PVC Wavin AW Φ3/4 " 19,500.00 bt
PVC Wavin AW Φ 1 " 26,000.00 bt
PVC Wavin AW Φ1 1/4 " 37,800.00 bt
PVC Wavin AW Φ 1 1/2 " 53,900.00 bt
PVC Wavin AW Φ 2 " 52,000.00 bt
PVC Wavin AW Φ 2 1/2 " 87,600.00 bt
PVC Wavin AW Φ 3 " 127,200.00 bt
PVC Wavin AW Φ 4 " 175,500.00 bt
PVC Wavin AW Φ 5 " 313,100.00 bt
PVC Wavin AW Φ 6 " 418,600.00 bt
21 Rangka atap baja ringan :
Trusses ZAM-75 t=0.8 Rangka Utama 32,500.00 m1
Trusses ZAM-75 t=0.5 Rangka Utama 20,800.00 m1
Reng 16 - DB Roof Battens t=0.48 mm 10,400.00 m1
Foot Plate t=1.22 mm 6,500.00 m1
PLD - Diafragma Plate 1,950.00 bh
WIND Bracing 1,500.00 m1
Tensioner (Pengaku Tali Angin) 6,500.00 bh
Baut Besar 550.00 Pcs
Baut Kecil 250.00 Pcs
Dynabolt 6,500.00 Pcs
22 Readymix :
Readymix K-175 746,000.00 m3
Readymix K-225 771,750.00 m3
Readymix K-250 731,880.00 m3
Readymix K-300 777,540.00 m3
23 Sanitair :
Monoblok CW 660 J/SW 660 J 1,777,200.00 Bh
Washtafel LW 230 J 1,086,340.00 Bh
Kran ex TOTO T 23 B13 166,900.00 Bh
Cermin TS 119 AS5 388,500.00 Bh
Floordrain TX 1B 287,000.00 Bh
Urinoar U 57 M 1,690,800.00 Bh
Sekat Urinoar A100 737,300.00 Bh
Kran dapur T30 ARQ 13N 342,400.00 Bh
Zink Stainles standar 1 lubang 564,000.00 Bh
24 Seng :
Seng BJLS 30 lembar 90 cm ( 1 rol 50 m') 52,500.00 lbr
Seng gelombang BJLS 30 41,590.00 lbr
Seng plat BJLS 30 lbr 90 cm (100 m') 26,530.00 m'
25 Sun screen ex Prometama :
Panellux sun screen 30,800.00 m'
Stringer SL-1@3m 150,200.00 m'
26 Tanah merah 28,100.00 m3
27 Waterproofing bitutin ex WR Grace t. 1,5 mm 184,510.00 m2
28 Wire mesh (2,10 x 5,4 m) :
MK 8 950,330.00 lbr
MK 7 727,680.00 lbr
MK 6 534,650.00 lbr
MK 5 371,240.00 lbr
MK 4 237,580.00 lbr

f:\522467212.xls\H_bahan Hal. 6
DAFTAR HARGA UPAH & ALAT KERJA
TAHUN ANGGARAN 2019

HARGA SATUAN
No. KLASIFIKASI PEKERJA SATUAN
(Rp)

1 Mandor 120,000 O/H


2 Kepala tukang besi beton 120,000 O/H
3 Tukang besi beton terampil 110,000 O/H
4 Tukang besi beton setengah terampil 100,000 O/H
5 Kepala tukang besi profil 150,000 O/H
6 Tukang besi profil terampil 130,000 O/H
7 Kepala tukang batu 120,000 O/H
8 Tukang batu terampil 110,000 O/H
9 Tukang batu setengah terampil 100,000 O/H
10 Kepala tukang kayu 120,000 O/H
11 Tukang kayu terampil 110,000 O/H
12 Tukang kayu setengah terampil 100,000 O/H
13 Kepala tukang cat 110,000 O/H
14 Tukang cat terampil 100,000 O/H
15 Tukang cat setengah terampil 90,000 O/H
16 Pekerja terampil 90,000 O/H
17 Pekerja setengah terampil 80,000 O/H
18 Pekerja 80,000 O/H

f:\522467212.xls\H_u.k
DAPTAR ABSEN PEKERJAAN

No. Nama Pekerja sabtu ming senin selasa rabu kamis jumat SAT. VOLUME GAJI

MINGGU 1. TGL.

1 Mang Aep Kep. Tukang


2 Mang Ade Tukang
3 Ohan Helper
4 Husen Helper
5 Endut Helper

6 Blek Tukang
7 Bah Atam Helper
8 Acong Helper
9 Isal Helper
10 Soleh Helper
11 Fardi Helper
12 Arif Helper
13 Mang Enang Helper
14 Jaelani Helper
15 Helper

Jumlah
JUMLAH KASBON

Anda mungkin juga menyukai