REKAPITULASI RENCANA ANGGARAN BIAYA

KEGIATAN : RENOVASI RUMAH TINGGAL


PEKERJAAN : RENOVASI
URAIAN PEKERJAAN : RENOVASI RUMAH TINGGAL TAHAP SEDANG
LOKASI : CILEUNYI BANDUNG
T. ANGGARAN : 2022

SUB JUMLAH BIAYA JUMLAH BIAYA


NO. URAIAN PEKERJAAN
( Rp. ) ( Rp. )

A PEKERJAAN PERSIAPAN Rp 4,689,258.71 Rp 4,689,258.71


B PEKERJAAN LANTAI 1 Rp 109,659,319.99 Rp 109,659,319.99

1 PEKERJAAN TANAH DAN PONDASI Rp 4,305,148.66

2 PEKERJAAN BETON & PENULANGAN Rp 28,597,459.11


3 PEKERJAAN PASANGAN DAN PLASTERAN Rp 17,066,717.72

4 PEKERJAAN LANTAI Rp 33,677,006.89


5 PEKERJAAN PINTU DAN JENDELA Rp 8,665,862.56

6 PEKERJAAN PLAFOND Rp 4,146,220.95

7 PEKERJAAN PENGECATAN Rp 4,160,882.59


8 PEKERJAAN LISTRIK Rp 8,011,228.20

9 PEKERJAAN SANITASI Rp 1,028,793.30


C PEKERJAAN LANTAI 2 Rp 228,687,281.72 Rp 228,687,281.72

1 PEKERJAAN BETON & PENULANGAN Rp 51,769,432.00


2 PEKERJAAN PASANGAN DAN PLASTERAN Rp 45,433,583.54

3 PEKERJAAN LANTAI Rp 56,342,790.52

4 PEKERJAAN PINTU DAN JENDELA Rp 26,788,508.54

5 PEKERJAAN PLAFOND Rp 8,221,070.02

6 PEKERJAAN PENGECATAN Rp 11,499,824.40

7 PEKERJAAN LISTRIK Rp 12,567,503.70

8 PEKERJAAN SANITASI Rp 16,064,568.99

D PEKERJAAN LANTAI DAK BETON Rp 65,577,880.67 Rp 65,577,880.67


1 PEKERJAAN BETON & PENULANGAN Rp 54,642,023.78

2 PEKERJAAN PASANGAN DAN PLASTERAN Rp 9,156,381.61

3 PEKERJAAN LANTAI Rp 1,779,475.28

E PEKERJAAN ATAP Rp 29,283,304.43 Rp 29,283,304.43

1 PEKERJAAN ATAP GENTENG Rp 25,100,727.84


2 PEKERJAAN ATAP KACA Rp 2,025,058.62
3 PEKERJAAN PEMBONGKARAN ATAP GENTENG LAMA Rp 2,157,517.97
F PEKERJAAN LAIN LAIN Rp 36,062,455.00 Rp 36,062,455.00

Rp 473,959,500.52

JUMLAH Rp 473,959,500.52
TOTAL JUMLAH Rp 473,959,500.52
DIBULATKAN Rp 473,950,000.00

Terbilang : Empat Ratus Tujuh Puluh Tiga Juta Sembilan Ratus Lima Puluh Ribu Rupiah
RENCANA ANGGARAN BIAYA

KEGIATAN : RENOVASI RUMAH TINGGAL


PEKERJAAN : RENOVASI
URAIAN PEKERJAAN
: RENOVASI RUMAH TINGGAL TAHAP SEDANG
LOKASI : CILEUNYI BANDUNG
T. ANGGARAN : 2022

HARGA JUMLAH PPN TOTAL


NO. URAIAN PEKERJAAN VOLUME STN SATUAN HARGA 11% HARGA
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
0%

A PEKERJAAN PERSIAPAN 4,689,258.71 4,689,258.71


1 Pekerjaan Pembongkaran Kolam Ikan 1.15 m3 795,648.70 916,587.30 - 916,587.30
2 Pekerjaan Pembongkaran Pintu 1.26 m3 795,648.70 1,002,517.36 - 1,002,517.36
3 Pekerjaan Pembongkaran Jendela 0.60 m3 795,648.70 477,389.22 - 477,389.22
4 Pekerjaan Pembongkaran Tiang Teras 0.14 m3 795,648.70 107,412.57 - 107,412.57
5 Pekerjaan Pembersihan Puing bongkaran 72.85 m3 30,000.00 2,185,352.25 - 2,185,352.25

JUMLAH PEKERJAAN PERSIAPAN 4,689,258.71 4,689,258.71

B PEKERJAAN LANTAI 1 109,659,319.99 109,659,319.99


1 PEKERJAAN TANAH DAN PONDASI
a Pekerjaan Tanah dan Pondasi P1
1 Galian Tanah pondasi 0.80 m3 87,450.00 69,960.00 - 69,960.00
2 Urugan Kembali tanah galian 0.27 m3 63,800.00 17,013.33 - 17,013.33
3 Urugan pasir Bawah Pondasi t = 5 cm 0.03 m3 166,980.00 5,343.36 - 5,343.36
4 Beton K-225 0.80 m3 1,050,119.37 840,095.49 - 840,095.49
5 Pembesian 66.14 Kg 19,290.70 1,275,898.20 - 1,275,898.20
6 Bekisting 4.00 m2 161,337.00 645,348.00 - 645,348.00

b Pekerjaan Tanah dan Pondasi P2


1 Galian Tanah pondasi 1.73 m3 87,450.00 151,113.60 - 151,113.60
2 Urugan Kembali tanah galian 0.58 m3 63,800.00 36,748.80 - 36,748.80
3 Urugan pasir Bawah Pondasi t = 5 cm 0.03 m3 166,980.00 5,343.36 - 5,343.36
4 Beton K-225 0.48 m3 1,050,119.37 504,057.30 - 504,057.30
5 Pembesian 25.72 Kg 19,290.70 496,088.02 - 496,088.02
6 Bekisting 1.60 m2 161,337.00 258,139.20 - 258,139.20

JUMLAH PEKERJAAN TANAH DAN PONDASI 4,305,148.66 4,305,148.66

2 PEKERJAAN BETON & PENULANGAN


a Pekerjaan Sloof
1 Beton K-225 0.95 m3 1,050,119.37 993,937.98 - 993,937.98
2 Pembesian 169.32 kg 19,290.70 3,266,211.04 - 3,266,211.04
3 Bekisting 8.83 m2 161,337.00 1,425,251.06 - 1,425,251.06

b Pekerjaan Balok
1 Beton K-225 0.28 m3 1,050,119.37 289,990.46 - 289,990.46
2 Pembesian 89.45 kg 19,290.70 1,725,512.80 - 1,725,512.80
3 Bekisting 5.75 m2 258,468.83 1,486,518.88 - 1,486,518.88

c Pekerjaan Pelat Lantai


1 Beton K-225 0.84 m3 1,050,119.37 880,367.57 - 880,367.57
2 Pembesian 125.39 kg 19,290.70 2,418,775.58 - 2,418,775.58
3 Bekisting 6.22 m2 258,468.83 1,608,386.93 - 1,608,386.93

d Pekerjaan Kolom
1 Beton K-225 1.49 m3 1,050,119.37 1,559,427.26 - 1,559,427.26
2 Pembesian 341.43 kg 19,290.70 6,586,420.68 - 6,586,420.68
3 Bekisting 24.96 m2 254,673.83 6,356,658.88 - 6,356,658.88

JUMLAH PEKERJAAN BETON & PENULANGAN 28,597,459.11 28,597,459.11


3 PEKERJAAN PASANGAN DAN PLASTERAN
1 Pasangan Dinding bata 54.79 m2 138,248.00 7,574,607.92 - 7,574,607.92
2 Plesteran Dinding bata 86.66 m2 72,791.40 6,308,102.72 - 6,308,102.72
3 Pembongkaran dinding bata 3.71 m3 795,648.70 2,954,860.25 - 2,954,860.25
4 Pembongkaran Meja Bartender 0.09 m3 795,648.70 71,608.38 - 71,608.38
5 Pembongkaran Meja Kichenset 0.20 m3 795,648.70 157,538.44 - 157,538.44

JUMLAH PEKERJAAN PASANGAN DAN PLASTERAN 17,066,717.72 17,066,717.72


4 PEKERJAAN LANTAI
1 Lantai Keramik Granit 60 x 60 cm (Polishid) 42.34 m2 379,857.50 16,083,166.55 - 16,083,166.55
2 Lantai Keramik Granit 60 x 60 cm (Unpolishid/antislip) 42.32 m2 379,857.50 16,075,569.40 - 16,075,569.40
3 Lantai Keramik Granit 10 x 60 cm (Polishid) 6.21 m2 98,443.40 611,333.51 - 611,333.51
4 Water Proofing - m2 38,957.05 - - -
5 Keramik mozaik - m2 - - -
6 Pembongkaran Keramik teras + Dalam 14.71 m3 13,805.00 203,037.04 - 203,037.04
7 Pembongkaran Keramik Garasi 38.70 m3 13,805.00 534,305.96 - 534,305.96
8 Pembongkaran Keramik Dapur 12.29 m3 13,805.00 169,594.43 - 169,594.43

JUMLAH PEKERJAAN LANTAI 33,677,006.89 33,677,006.89


5 PEKERJAAN PINTU DAN JENDELA
1 Pekerjaan Pintu Type (PJ1) + Aksesoris - Unit 6,165,658.90 - - -
2 Pekerjaan Pintu Type (PJ2) + Aksesoris - Unit 5,953,522.31 - - -
HARGA JUMLAH PPN TOTAL
NO. URAIAN PEKERJAAN VOLUME STN SATUAN HARGA 11% HARGA
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
3 Pekerjaan Pintu Type (P1) + Aksesoris 1.00 Unit 2,293,377.87 2,293,377.87 - 2,293,377.87
4 Pekerjaan Pintu Type (P2) + Aksesoris 1.00 Unit 2,293,377.87 2,293,377.87 - 2,293,377.87
5 Pekerjaan Pintu Type (P3) + Aksesoris - Unit 1,612,824.13 - - -
6 Pekerjaan Jendela Type (J1) + Aksesoris - Unit 783,989.19 - - -
7 Pekerjaan Jendela Type (J2) + Aksesoris 1.00 Unit 2,078,948.83 2,078,948.83 - 2,078,948.83
8 Pekerjaan Jendela Type (J3) + Aksesoris - Unit 1,106,399.59 - - -
9 Pekerjaan Jendela Type (J4) + Aksesoris - Unit 1,081,919.29 - - -
10 Pekerjaan Pintu Type (PG) + Aksesoris - Unit 1,399,863.64 - - -
11 Pekerjaan Ventilasi Type (V1) + Aksesoris - Unit 549,517.10 - - -
12 Pekerjaan Ventilasi Type (V2) + Aksesoris 14.00 Unit 20,000.00 280,000.00 - 280,000.00
13 Pekerjaan Ventilasi Type (V3) + Aksesoris 2.00 Unit 403,942.77 807,885.54 - 807,885.54
14 Pekerjaan Ventilasi Type (V4) + Aksesoris 2.00 Unit 456,136.23 912,272.46 - 912,272.46

JUMLAH PEKERJAAN PINTU DAN JENDELA 8,665,862.56 8,665,862.56


6 PEKERJAAN PLAFOND
1 Plafond GRC Board T:6mm 35.96 m2 78,553.49 2,824,783.62 - 2,824,783.62
2 List Gypsum 7 cm pada plafond GRC 60.80 m' 21,734.17 1,321,437.33 - 1,321,437.33

JUMLAH PEKERJAAN PLAFOND 4,146,220.95 4,146,220.95


7 PEKERJAAN PENGECATAN
1 Pekerjaan cat tembok Baru 117.37 m2 26,609.00 3,123,131.59 - 3,123,131.59
2 Pekerjaan cat Plafond Baru 39.00 m2 26,609.00 1,037,751.00 - 1,037,751.00

JUMLAH PEKERJAAN PENGECATAN 4,160,882.59 4,160,882.59


8 PEKERJAAN LISTRIK
1 Pemasangan Lampu TL 40 Watt 7.00 Bh 114,378.00 800,646.00 - 800,646.00
2 Lampu Hias minimalis 1.00 Bh 300,000.00 300,000.00 - 300,000.00
3 XL Down Light kotak panjang in bow 20 watt 4.00 Bh 400,000.00 1,600,000.00 - 1,600,000.00
4 Saklar Tunggal 1.00 Bh 33,275.00 33,275.00 - 33,275.00
5 Saklar Ganda 1.00 Bh 38,830.00 38,830.00 - 38,830.00
6 Saklar Triple 1.00 Bh 38,830.00 38,830.00 - 38,830.00
7 Stok Kontak Single 4.00 Bh 24,942.50 99,770.00 - 99,770.00
8 Pipa PVC Untuk Kabel NYA 2,5 mm Tertanam Dalam Dinding 14.00 m' 62,926.60 880,972.40 - 880,972.40
9 Instalasi Titik Penerangan, fitting termasuk kabel NYA 2,5 mm 12.00 Titik 226,816.15 2,721,793.80 - 2,721,793.80
dalam pipa PVC fitting lampu dan kelengkapan instalasi - -
10 Instalasi Titik Stop Kontak, instalasi termasuk kabel NYA 2,5 mm 7.00 titik 213,873.00 1,497,111.00 - 1,497,111.00
dalam pipa PVC Kotak Kontak dan kelengkapan - -

JUMLAH PEKERJAAN LISTRIK 8,011,228.20 8,011,228.20


9 PEKERJAAN SANITASI
1 Wastafel - Unit 1,286,615.00 - - -
2 Pemasangan Urinoir Keramik Standar - Bh 1,790,151.00 - - -
3 Pemasangan Pembatas Urinoir (ex.Toto) - Bh 775,000.00 - - -
4 Pemasangan Closet Jongkok Merk Toto - Bh 735,936.67 - - -
5 Pemasangan Closet Duduk Merk American Standart - Bh 2,794,311.14 - - -
6 Pasang Jet Shower 2.00 Unit 78,000.00 156,000.00 - 156,000.00
7 Pasang Kran Cuci Piring 1.00 Unit 37,800.00 37,800.00 - 37,800.00
8 Pasang Floor Drain Stainles Steel 1.00 Bh 75,000.00 75,000.00 - 75,000.00
9 Pasang Instalasi Air Kotor Padat (pipa PVC Type AW 3 & 4 Inc ) - m1 124,895.10 - - -
10 Pasang Instalasi Air Kotor Cair (pipa PVC Type AW 3/4 Inc ) 3.00 m1 124,895.10 374,685.30 - 374,685.30
11 Pasang Instalasi Air Bersih (pipa PVC tipe AW diameter 1/2") 15.00 m1 25,687.20 385,308.00 - 385,308.00
12 Tangki Air 1000 Liter (Penguin) - Unit 1,600,000.00 - - -

JUMLAH PEKERJAAN SANITASI 1,028,793.30 1,028,793.30


C PEKERJAAN LANTAI 2 228,687,281.72 228,687,281.72
1 PEKERJAAN BETON & PENULANGAN
a Pekerjaan Balok
1 Beton K-225 0.71 m3 1,050,119.37 741,751.81 - 741,751.81
2 Pembesian 231.02 kg 19,290.70 4,456,552.85 - 4,456,552.85
3 Bekisting 12.36 m2 258,468.83 3,193,382.44 - 3,193,382.44

b Pekerjaan Pelat Lantai


1 Beton K-225 2.26 m3 1,050,119.37 2,377,514.14 - 2,377,514.14
2 Pembesian 332.30 kg 19,290.70 6,410,300.76 - 6,410,300.76
3 Bekisting 16.56 m2 258,468.83 4,279,401.40 - 4,279,401.40

c Pekerjaan Kolom
1 Beton K-225 2.67 m3 1,050,119.37 2,803,818.70 - 2,803,818.70
2 Pembesian 592.54 kg 19,290.70 11,430,424.18 - 11,430,424.18
3 Bekisting 63.13 m2 254,673.83 16,076,285.73 - 16,076,285.73

JUMLAH PEKERJAAN BETON & PENULANGAN 51,769,432.00 51,769,432.00


2 PEKERJAAN PASANGAN DAN PLASTERAN
1 Pasangan Dinding bata 138.28 m2 138,248.00 19,116,933.44 - 19,116,933.44
2 Plesteran Dinding bata 276.56 m2 72,791.40 20,131,189.58 - 20,131,189.58
3 Pembongkaran dinding bata 7.77 m3 795,648.70 6,185,460.52 - 6,185,460.52
4 Pembongkaran Meja Bartender - m3 795,648.70 - - -
5 Pembongkaran Meja Kichenset - m3 795,648.70 - - -

JUMLAH PEKERJAAN PASANGAN DAN PLASTERAN 45,433,583.54 45,433,583.54


3 PEKERJAAN LANTAI
1 Lantai Keramik Granit 60 x 60 cm (Polishid) 91.71 m2 379,857.50 34,836,731.33 - 34,836,731.33
2 Lantai Keramik Granit 60 x 60 cm (Unpolishid/antislip) 40.32 m2 379,857.50 15,315,854.40 - 15,315,854.40
3 Lantai Keramik Granit 10 x 60 cm (Polishid) 6.21 m2 620,053.50 3,850,532.24 - 3,850,532.24
HARGA JUMLAH PPN TOTAL
NO. URAIAN PEKERJAAN VOLUME STN SATUAN HARGA 11% HARGA
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
4 Water Proofing 19.79 m2 38,957.05 770,960.02 - 770,960.02
5 Keramik mozaik 2.35 m2 379,857.50 892,665.13 - 892,665.13
6 Pembongkaran Keramik Dalam 43.86 m2 13,805.00 605,538.38 - 605,538.38
7 Pembongkaran Keramik Toilet 2.19 m2 13,805.00 30,285.41 - 30,285.41
8 Pembongkaran Keramik Teras depan 2.91 m2 13,805.00 40,223.63 - 40,223.63

JUMLAH PEKERJAAN LANTAI 56,342,790.52 56,342,790.52


4 PEKERJAAN PINTU DAN JENDELA
1 Pekerjaan Pintu Type (PJ1) + Aksesoris 1.00 Unit 6,165,658.90 6,165,658.90 - 6,165,658.90
2 Pekerjaan Pintu Type (PJ2) + Aksesoris 1.00 Unit 5,953,522.31 5,953,522.31 - 5,953,522.31
3 Pekerjaan Pintu Type (P1) + Aksesoris - Unit 2,293,377.87 - - -
4 Pekerjaan Pintu Type (P2) + Aksesoris 2.00 Unit 2,293,377.87 4,586,755.73 - 4,586,755.73
5 Pekerjaan Pintu Type (P3) + Aksesoris 3.00 Unit 1,612,824.13 4,838,472.38 - 4,838,472.38
6 Pekerjaan Jendela Type (J1) + Aksesoris - Unit 783,989.19 - - -
7 Pekerjaan Jendela Type (J2) + Aksesoris - Unit 2,078,948.83 - - -
8 Pekerjaan Jendela Type (J3) + Aksesoris 2.00 Unit 1,106,399.59 2,212,799.19 - 2,212,799.19
9 Pekerjaan Jendela Type (J4) + Aksesoris 1.00 Unit 1,081,919.29 1,081,919.29 - 1,081,919.29
10 Pekerjaan Pintu Type (PG) + Aksesoris 1.00 Unit 1,399,863.64 1,399,863.64 - 1,399,863.64
11 Pekerjaan Ventilasi Type (V1) + Aksesoris 1.00 Unit 549,517.10 549,517.10 - 549,517.10
12 Pekerjaan Ventilasi Type (V2) + Aksesoris - Unit 20,000.00 - - -
13 Pekerjaan Ventilasi Type (V3) + Aksesoris - Unit 403,942.77 - - -
14 Pekerjaan Ventilasi Type (V4) + Aksesoris - Unit 456,136.23 - - -

JUMLAH PEKERJAAN PINTU DAN JENDELA 26,788,508.54 26,788,508.54


5 PEKERJAAN PLAFOND
1 Plafond GRC Board T:6mm 74.73 m2 78,553.49 5,870,302.56 - 5,870,302.56
2 List Gypsum 7 cm pada plafond GRC 108.16 m' 21,734.17 2,350,767.47 - 2,350,767.47

JUMLAH PEKERJAAN PLAFOND 8,221,070.02 8,221,070.02


6 PEKERJAAN PENGECATAN
1 Pekerjaan cat tembok Baru 352.04 m2 26,609.00 9,367,432.36 - 9,367,432.36
2 Pekerjaan cat Plafond Baru 80.14 m2 26,609.00 2,132,392.04 - 2,132,392.04

JUMLAH PEKERJAAN PENGECATAN 11,499,824.40 11,499,824.40


7 PEKERJAAN LISTRIK
1 Pemasangan Lampu TL 40 Watt 17.00 Bh 114,378.00 1,944,426.00 - 1,944,426.00
2 Lampu Hias minimalis - Bh 300,000.00 - - -
3 Lampu dinding 1.00 Bh 400,000.00 400,000.00 - 400,000.00
4 Saklar Tunggal 1.00 Bh 33,275.00 33,275.00 - 33,275.00
5 Saklar Ganda 7.00 Bh 38,830.00 271,810.00 - 271,810.00
6 Saklar Triple - Bh 38,830.00 - - -
7 Stok Kontak Single 12.00 Bh 24,942.50 299,310.00 - 299,310.00
8 Pipa PVC Untuk Kabel NYA 2,5 mm Tertanam Dalam Dinding 20.00 Bh 62,926.60 1,258,532.00 - 1,258,532.00
9 Instalasi Titik Penerangan, fitting termasuk kabel NYA 2,5 mm 18.00 Titik 226,816.15 4,082,690.70 - 4,082,690.70
dalam pipa PVC fitting lampu dan kelengkapan instalasi - -
10 Instalasi Titik Stop Kontak, instalasi termasuk kabel NYA 2,5 mm 20.00 titik 213,873.00 4,277,460.00 - 4,277,460.00
dalam pipa PVC Kotak Kontak dan kelengkapan - -

JUMLAH PEKERJAAN LISTRIK 12,567,503.70 12,567,503.70


8 PEKERJAAN SANITASI
1 Wastafel 2.00 Unit 1,286,615.00 2,573,230.00 - 2,573,230.00
2 Pemasangan Urinoir Keramik Standar - Bh 1,790,151.00 - - -
3 Pemasangan Pembatas Urinoir (ex.Toto) - Bh 775,000.00 - - -
4 Pemasangan Closet Jongkok Merk Toto - Bh 735,936.67 - - -
5 Pemasangan Closet Duduk Merk American Standart 2.00 Bh 2,794,311.14 5,588,622.29 - 5,588,622.29
6 Pasang Jet Shower 2.00 Unit 78,000.00 156,000.00 - 156,000.00
7 Pasang Kran stainles 5.00 Unit 37,800.00 189,000.00 - 189,000.00
8 Pasang Floor Drain Stainles Steel 5.00 Bh 75,000.00 375,000.00 - 375,000.00
9 Pasang Instalasi Air Kotor Padat (pipa PVC Type AW 3 & 4 Inc ) 7.17 m1 124,895.10 895,650.89 - 895,650.89
10 Pasang Instalasi Air Kotor Cair (pipa PVC Type AW 3/4 Inc ) 34.22 m1 124,895.10 4,274,272.52 - 4,274,272.52
11 Pasang Instalasi Air Bersih (pipa PVC tipe AW diameter 1/2") 16.07 m1 25,687.20 412,793.30 - 412,793.30
12 Tangki Air 1000 Liter (Penguin) 1.00 Unit 1,600,000.00 1,600,000.00 - 1,600,000.00

JUMLAH PEKERJAAN SANITASI 16,064,568.99 16,064,568.99


D PEKERJAAN LANTAI DAK BETON 65,577,880.67 65,577,880.67
1 PEKERJAAN BETON & PENULANGAN
a Pekerjaan Balok
1 Beton K-225 2.73 m3 1,050,119.37 2,866,430.60 - 2,866,430.60
2 Pembesian 685.61 kg 19,290.70 13,225,868.90 - 13,225,868.90
3 Bekisting 50.01 m2 258,468.83 12,925,873.34 - 12,925,873.34

b Pekerjaan Pelat Lantai


1 Beton K-225 3.66 m3 1,050,119.37 3,846,045.79 - 3,846,045.79
2 Pembesian 488.09 kg 19,290.70 9,415,615.21 - 9,415,615.21
3 Bekisting 29.14 m2 258,468.83 7,533,063.55 - 7,533,063.55

c Pekerjaan Kolom
1 Beton K-225 0.40 m3 1,050,119.37 421,045.36 - 421,045.36
2 Pembesian 87.35 kg 19,290.70 1,685,108.40 - 1,685,108.40
3 Bekisting 10.69 m2 254,673.83 2,722,972.63 - 2,722,972.63

JUMLAH PEKERJAAN BETON & PENULANGAN 54,642,023.78 54,642,023.78


2 PEKERJAAN PASANGAN DAN PLASTERAN
1 Pasangan Dinding bata 32.26 m2 138,248.00 4,459,880.48 - 4,459,880.48
HARGA JUMLAH PPN TOTAL
NO. URAIAN PEKERJAAN VOLUME STN SATUAN HARGA 11% HARGA
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
2 Plesteran Dinding bata 64.52 m2 72,791.40 4,696,501.13 - 4,696,501.13

JUMLAH PEKERJAAN PASANGAN DAN PLASTERAN 9,156,381.61 9,156,381.61


3 PEKERJAAN LANTAI
1 Water Proofing 24.98 m2 71,236.00 1,779,475.28 - 1,779,475.28

JUMLAH PEKERJAAN LANTAI 1,779,475.28 1,779,475.28


E PEKERJAAN ATAP 14,641,652.21 29,283,304.43
1 PEKERJAAN ATAP GENTENG
1 Rangka atap Kayu Kaso 61.44 m2 219,147.50 13,463,790.68 - 13,463,790.68
2 Pasangan Atap Genteng Beton 61.44 m2 179,506.80 11,028,380.34 - 11,028,380.34
3 Pasangan Listplank Kayu 2,5 x 25 CM 7.05 m' 86,267.50 608,556.83 - 608,556.83
JUMLAH PEKERJAAN ATAP GENTENG 25,100,727.84
2 PEKERJAAN ATAP KACA
1 Rangka atap Kayu baja Hollow Galvanis 5x10 4.27 m2 190,932.50 815,039.29 - 815,039.29
2 Pasangan Atap Kaca Tempred 8mm 4.27 m2 283,461.20 1,210,019.33 - 1,210,019.33
3 Pasangan Listplank Kayu 2,5 x 25 CM - m'
JUMLAH PEKERJAAN ATAP KACA 2,025,058.62
3 PEKERJAAN PEMBONGKARAN ATAP GENTENG LAMA
1 Pembongkaran Rangka atap Kayu Kaso 61.44 m2 22,357.50 1,373,580.35 - 1,373,580.35
2 Pembongkaran Atap Genteng Beton 61.44 m2 12,760.00 783,937.62 - 783,937.62

JUMLAH PEKERJAAN PEMBONGKARAN ATAP GENTENG LAMA 2,157,517.97


F PEKERJAAN LAIN LAIN 18,031,227.50 36,062,455.00
1 Waterhiter 1.00 Unit 16,500,000.00 16,500,000.00 - 16,500,000.00
2 Smart Lock Card 1.00 ls 904,500.00 904,500.00 - 904,500.00
3 Pekerjaan Railling Kaca Tangga 6.52 m' 1,450,000.00 9,460,960.00 - 9,460,960.00
4 Pekerjaan Railling Kaca Bordes depan 5.65 m' 1,450,000.00 8,196,995.00 - 8,196,995.00
5 Pekerjaan Perbaikan Tangga 1.00 ls 1,000,000.00 1,000,000.00 - 1,000,000.00
PERHITUNGAN VOLUME PEKERJAAN

KEGIATAN RENOVASI RUMAH TINGGAL


PEKERJAAN RENOVASI
URAIAN PEKERJAAN RENOVASI RUMAH TINGGAL TAHAP SEDANG
LOKASI CILEUNYI BANDUNG

DIMENSI (M) PERHITUNGAN VOLUME


TINGGI
NO JENIS PEKERJAAN (T) JUMLAH VOLUME SATUAN
PANJANG (P) LEBAR (L) RUMUS ANGKA
(N)

A. PEKERJAAN PERSIAPAN
1 Pekerjaan Pembongkaran Kolam Ikan 6.40 0.15 1.20 1 =PxLxTxN = 6.40 x 0.15 x 1.20 x 1.00 1.15 m3
2 Pekerjaan Pembongkaran Pintu 1.00 0.15 2.10 4 =PxLxTxN = 1.00 x 0.15 x 2.10 x 4.00 1.26 m3
3 Pekerjaan Pembongkaran Jendela 0.50 0.15 2.00 4 =PxLxTxN = 0.50 x 0.15 x 2.00 x 4.00 0.60 m3
4 Pekerjaan Pembongkaran Tiang Teras 0.15 0.30 3.00 1 =PxLxTxN = 0.15 x 0.30 x 3.00 x 1.00 0.14 m3
5 Pekerjaan Pembersihan Puing bongkaran 72.85 m3

B PEKERJAAN LANTAI 1
1 PEKERJAAN TANAH DAN PONDASI
a Pekerjaan Tanah dan Pondasi P1
1 Galian Tanah pondasi 0.80 0.80 0.25 5 =PxLxTxN = 0.80 x 0.80 x 0.25 x 5.00 0.80 m3
2 Urugan Kembali tanah galian = 1/3 x Volume Galian = 1/3 x (0.80) 0.27 m
3

3 Urugan pasir Bawah Pondasi t = 5 cm 0.80 0.80 0.05 =PxLxT = 0.80 x 0.80 x 0.05 0.03 m3
4 Beton K-225 0.80 0.80 0.25 5 =PxLxTxN = 0.80 x 0.80 x 0.25 x 5.00 0.80 m
3

5 Pembesian 66.14 Kg
6 Bekisting 4.00 m2

b Pekerjaan Tanah dan Pondasi P2


1 Galian Tanah pondasi 0.80 0.80 0.90 3 =PxLxTxN = 0.80 x 0.80 x 0.90 x 3.00 1.73 m
3

2 Urugan Kembali tanah galian = 1/3 x Volume Galian = 1/3 x (1.73) 0.58 m
3

3 Urugan pasir Bawah Pondasi t = 5 cm 0.80 0.80 0.05 =PxLxT = 0.80 x 0.80 x 0.05 0.03 m
3

4 Beton K-225 0.80 0.80 0.25 3 =PxLxTxN = 0.80 x 0.80 x 0.25 x 3.00 0.48 m
3

5 Pembesian 25.72 Kg
6 Bekisting 1.60 m2

2 PEKERJAAN BETON & PENULANGAN


a Pekerjaan Sloof
1 Beton K-225 0.95 m3
2 Pembesian 169.32 kg
3 Bekisting 8.83 m2

b Pekerjaan Balok
1 Beton K-225 0.28 m3
2 Pembesian 89.45 kg
3 Bekisting 5.75 m2

c Pekerjaan Pelat Lantai


1 Beton K-225 0.84 m3
2 Pembesian 125.39 kg
3 Bekisting 6.22 m2

d Pekerjaan Kolom
1 Beton K-225 1.49 m3
2 Pembesian 341.43 kg
3 Bekisting 24.96 m2

3 PEKERJAAN PASANGAN DAN PLASTERAN


1 Pasangan Dinding bata 54.79 m2
2 Plesteran Dinding bata 86.66 m2
3 Pembongkaran dinding bata 7.33 0.15 3.38 1 =PxLxTxN = 7.33 x 0.15 x 3.38 x 1.00 3.71 m3
4 Pembongkaran Meja Bartender 1.00 0.15 0.60 1 =PxLxTxN = 1.00 x 0.15 x 0.60 x 1.00 0.09 m3
5 Pembongkaran Meja Kichenset 2.20 0.15 0.60 1 =PxLxTxN = 2.20 x 0.15 x 0.60 x 1.00 0.20 m3

4 PEKERJAAN LANTAI
1 Lantai Keramik Granit 60 x 60 cm (Polishid) 42.34 m2
2 Lantai Keramik Granit 60 x 60 cm (Unpolishid/antislip) 42.32 m2
3 Lantai Keramik Granit 10 x 60 cm (Polishid) 6.21 m2
4 Water Proofing 0.00 m2
5 Keramik mozaik 0.00 m2
6 Pembongkaran Keramik teras + Dalam 14.71 m3
7 Pembongkaran Keramik Garasi 38.70 m3
8 Pembongkaran Keramik Dapur 12.29 m3

5 PEKERJAAN PINTU DAN JENDELA


1 Pekerjaan Pintu Type (PJ1) + Aksesoris Unit
2 Pekerjaan Pintu Type (PJ2) + Aksesoris Unit
3 Pekerjaan Pintu Type (P1) + Aksesoris 1.00 Unit
4 Pekerjaan Pintu Type (P2) + Aksesoris 1.00 Unit
5 Pekerjaan Pintu Type (P3) + Aksesoris Unit
6 Pekerjaan Jendela Type (J1) + Aksesoris Unit
7 Pekerjaan Jendela Type (J2) + Aksesoris 1.00 Unit
8 Pekerjaan Jendela Type (J3) + Aksesoris Unit
DIMENSI (M) PERHITUNGAN VOLUME
TINGGI
NO JENIS PEKERJAAN (T) JUMLAH VOLUME SATUAN
PANJANG (P) LEBAR (L) RUMUS ANGKA
(N)

9 Pekerjaan Jendela Type (J4) + Aksesoris Unit


10 Pekerjaan Pintu Type (PG) + Aksesoris Unit
11 Pekerjaan Ventilasi Type (V1) + Aksesoris Unit
12 Pekerjaan Ventilasi Type (V2) + Aksesoris 14.00 Unit
13 Pekerjaan Ventilasi Type (V3) + Aksesoris 2.00 Unit
14 Pekerjaan Ventilasi Type (V4) + Aksesoris 2.00 Unit

6 PEKERJAAN PLAFOND
1 Plafond GRC Board T:6mm 35.96 m2
2 List Gypsum 7 cm pada plafond GRC 60.80 m'

7 PEKERJAAN PENGECATAN
1 Pekerjaan cat tembok Baru 117.37 m2
2 Pekerjaan cat Plafond Baru 39.00 m2

8 PEKERJAAN LISTRIK
1 Pemasangan Lampu TL 40 Watt 7.00 Bh
2 Lampu Hias minimalis 1.00 Bh
3 XL Down Light kotak panjang in bow 20 watt 4.00 Bh
4 Saklar Tunggal 1.00 Bh
5 Saklar Ganda 1.00 Bh
6 Saklar Triple 1.00 Bh
7 Stok Kontak Single 4.00 Bh
8 Pipa PVC Untuk Kabel NYA 2,5 mm Tertanam Dalam Dinding 14.00 m'
9 Instalasi Titik Penerangan, fitting termasuk kabel NYA 2,5 mm 12.00 Titik
dalam pipa PVC fitting lampu dan kelengkapan instalasi
10 Instalasi Titik Stop Kontak, instalasi termasuk kabel NYA 2,5 mm 7.00 titik
dalam pipa PVC Kotak Kontak dan kelengkapan

10 PEKERJAAN SANITASI
1 Wastafel Unit
2 Pemasangan Urinoir Keramik Standar Bh
3 Pemasangan Pembatas Urinoir (ex.Toto) Bh
4 Pemasangan Closet Jongkok Merk Toto Bh
5 Pemasangan Closet Duduk Merk American Standart Bh
6 Pasang Jet Shower 2.00 Unit
7 Pasang Kran Cuci Piring 1.00 Unit
8 Pasang Floor Drain Stainles Steel 1.00 Bh
9 Pasang Instalasi Air Kotor Padat (pipa PVC Type AW 3 & 4 Inc ) 7.2 0.00 m1
10 Pasang Instalasi Air Kotor Cair (pipa PVC Type AW 3/4 Inc ) 24.9 3.00 m1
11 Pasang Instalasi Air Bersih (pipa PVC tipe AW diameter 1/2") 43.7 15.00 m1
12 Tangki Air 1000 Liter (Penguin) 0.00 Unit

C PEKERJAAN LANTAI 2
2 PEKERJAAN BETON & PENULANGAN
a Pekerjaan Balok
1 Beton K-225 0.71 m3
2 Pembesian 231.02 kg
3 Bekisting 12.36 m2

b Pekerjaan Pelat Lantai


1 Beton K-225 2.26 m3
2 Pembesian 332.30 kg
3 Bekisting 16.56 m2

c Pekerjaan Kolom
1 Beton K-225 2.67 m3
2 Pembesian 592.54 kg
3 Bekisting 63.13 m2

3 PEKERJAAN PASANGAN DAN PLASTERAN


1 Pasangan Dinding bata 138.28 m2
2 Plesteran Dinding bata 276.56 m2
3 Pembongkaran dinding bata 17.28 0.15 3.00 1 =PxLxTxN = 17.28 x 0.15 x 3.00 x 1.00 7.77 m3
4 Pembongkaran Meja Bartender 1 =PxLxTxN = 0.00 x 0.00 x 0.00 x 1.00 0.00 m3
5 Pembongkaran Meja Kichenset 1 =PxLxTxN = 0.00 x 0.00 x 0.00 x 1.00 0.00 m3

4 PEKERJAAN LANTAI
1 Lantai Keramik Granit 60 x 60 cm (Polishid) 91.71 m2
2 Lantai Keramik Granit 60 x 60 cm (Unpolishid/antislip) 40.32 m2
3 Lantai Keramik Granit 10 x 60 cm (Polishid) 6.21 m2
4 Water Proofing 19.79 m2
5 Keramik mozaik 2.35 m2
6 Pembongkaran Keramik Dalam 43.86 m
2

7 Pembongkaran Keramik Toilet 2.19 m


2

8 Pembongkaran Keramik Teras depan 2.91 m2

5 PEKERJAAN PINTU DAN JENDELA


1 Pekerjaan Pintu Type (PJ1) + Aksesoris 1.00 Unit
DIMENSI (M) PERHITUNGAN VOLUME
TINGGI
NO JENIS PEKERJAAN (T) JUMLAH VOLUME SATUAN
PANJANG (P) LEBAR (L) RUMUS ANGKA
(N)

2 Pekerjaan Pintu Type (PJ2) + Aksesoris 1.00 Unit


3 Pekerjaan Pintu Type (P1) + Aksesoris Unit
4 Pekerjaan Pintu Type (P2) + Aksesoris 2.00 Unit
5 Pekerjaan Pintu Type (P3) + Aksesoris 3.00 Unit
6 Pekerjaan Jendela Type (J1) + Aksesoris Unit
7 Pekerjaan Jendela Type (J2) + Aksesoris Unit
8 Pekerjaan Jendela Type (J3) + Aksesoris 2.00 Unit
9 Pekerjaan Jendela Type (J4) + Aksesoris 1.00 Unit
10 Pekerjaan Pintu Type (PG) + Aksesoris 1.00 Unit
11 Pekerjaan Ventilasi Type (V1) + Aksesoris 1.00 Unit
12 Pekerjaan Ventilasi Type (V2) + Aksesoris Unit
13 Pekerjaan Ventilasi Type (V3) + Aksesoris Unit
14 Pekerjaan Ventilasi Type (V4) + Aksesoris Unit

6 PEKERJAAN PLAFOND
1 Plafond GRC Board T:6mm 74.73 m2
2 List Gypsum 7 cm pada plafond GRC 108.16 m'

7 PEKERJAAN PENGECATAN
1 Pekerjaan cat tembok Baru 352.04 m2
2 Pekerjaan cat Plafond Baru 80.14 m2

8 PEKERJAAN LISTRIK
1 Pemasangan Lampu TL 40 Watt 17.00 Bh
2 Lampu Hias minimalis 0.00 Bh
3 Lampu dinding 1.00 Bh
4 Saklar Tunggal 1.00 Bh
5 Saklar Ganda 7.00 Bh
6 Saklar Triple 0.00 Bh
7 Stok Kontak Single 12.00 Bh
8 Pipa PVC Untuk Kabel NYA 2,5 mm Tertanam Dalam Dinding 20.00 Bh
9 Instalasi Titik Penerangan, fitting termasuk kabel NYA 2,5 mm 18.00 Titik
dalam pipa PVC fitting lampu dan kelengkapan instalasi
10 Instalasi Titik Stop Kontak, instalasi termasuk kabel NYA 2,5 mm 20.00 titik
dalam pipa PVC Kotak Kontak dan kelengkapan

10 PEKERJAAN SANITASI
1 Wastafel 2.00 Unit
2 Pemasangan Urinoir Keramik Standar 0.00 Bh
3 Pemasangan Pembatas Urinoir (ex.Toto) 0.00 Bh
4 Pemasangan Closet Jongkok Merk Toto 0.00 Bh
5 Pemasangan Closet Duduk Merk American Standart 2.00 Bh
6 Pasang Jet Shower 2.00 Unit
7 Pasang Kran stainles 5.00 Unit
8 Pasang Floor Drain Stainles Steel 5.00 Bh
9 Pasang Instalasi Air Kotor Padat (pipa PVC Type AW 3 & 4 Inc ) 7.2 7.17 m1
10 Pasang Instalasi Air Kotor Cair (pipa PVC Type AW 3/4 Inc ) 34.2 34.22 m1
11 Pasang Instalasi Air Bersih (pipa PVC tipe AW diameter 1/2") 16.1 16.07 m1
12 Tangki Air 1000 Liter (Penguin) 1.00 Unit

D PEKERJAAN LANTAI DAK BETON


2 PEKERJAAN BETON & PENULANGAN
a Pekerjaan Balok
1 Beton K-225 2.73 m3
2 Pembesian 685.61 kg
3 Bekisting 50.01 m2

b Pekerjaan Pelat Lantai


1 Beton K-225 3.66 m3
2 Pembesian 488.09 kg
3 Bekisting 29.14 m2

c Pekerjaan Kolom
1 Beton K-225 0.40 m3
2 Pembesian 87.35 kg
3 Bekisting 10.69 m2

3 PEKERJAAN PASANGAN DAN PLASTERAN


1 Pasangan Dinding bata 32.26 m2
2 Plesteran Dinding bata 64.52 m2

4 PEKERJAAN LANTAI
1 Water Proofing 24.98 m2

E PEKERJAAN ATAP
1 PEKERJAAN ATAP GENTENG
1 Rangka atap Kayu Kaso
- Area 1 1.70 2.78 =PxL = 1.70 x 2.78 4.72 m2
- Area 2 10.06 5.64 =PxL = 10.06 x 5.64 56.72 m2
DIMENSI (M) PERHITUNGAN VOLUME
TINGGI
NO JENIS PEKERJAAN (T) JUMLAH VOLUME SATUAN
PANJANG (P) LEBAR (L) RUMUS ANGKA
(N)

Rangka atap Kayu Kaso 61.44 m2


2 Pasangan Atap Genteng Beton
- Area 1 1.70 2.78 =PxL = 1.70 x 2.78 4.72 m2
2
- Area 2 10.06 5.64 =PxL = 10.06 x 5.64 56.72 m
2
Pasangan Atap Genteng Beton 61.44 m
3 Pasangan Listplank Kayu 2,5 x 25 CM 7.05 =P = 7.05 7.05 m'

2 PEKERJAAN ATAP KACA


1 Rangka atap Kayu baja Hollow Galvanis 5x10
- Area 1 5.70 0.75 =PxL = 5.70 x 0.75 4.27 m2
- Area 2 =PxL = 0.00 x 0.00 0.00 m2
Rangka atap Kayu baja Hollow Galvanis 5x10 4.27 m2
2 Pasangan Atap Kaca Tempred 8mm
- Area 1 5.70 0.75 =PxL = 5.70 x 0.75 4.27 m2
- Area 2 =PxL = 0.00 x 0.00 0.00 m2
2
Pasangan Atap Kaca Tempred 8mm 4.27 m
3 Pasangan Listplank Kayu 2,5 x 25 CM =P = 0.00 0.00 m'

3 PEKERJAAN PEMBONGKARAN ATAP GENTENG LAMA


1 Pembongkaran Rangka atap Kayu Kaso
- Area 1 1.70 2.78 =PxL = 1.70 x 2.78 4.72 m2
- Area 2 10.06 5.64 =PxL = 10.06 x 5.64 56.72 m2
Pembongkaran Rangka atap Kayu Kaso 61.44 m2
2 Pembongkaran Atap Genteng Beton
- Area 1 1.70 2.78 =PxL = 1.70 x 2.78 4.72 m2
- Area 2 10.06 5.64 =PxL = 10.06 x 5.64 56.72 m2
Pembongkaran Atap Genteng Beton 61.44 m2

F PEKERJAAN LAIN LAIN


1 Waterhiter 1.00 Unit
2 Smart Lock Card 1.00 ls
3 Pekerjaan Railling Kaca Tangga 6.52 6.52 m'
4 Pekerjaan Railling Kaca Bordes depan 5.65 5.65 m'
5 Pekerjaan Perbaikan Tangga 1.00 ls