SATUAN KERJA : PJN WILAYAH II PROVINSI LAMPUNG PROVINSI/KAB/KOTA : LAMPUNG / PESISIR BARAT

KEGIATAN : PKK 2.2 PROVINSI LAMPUNG


NAMA PAKET : PENANGANAN LONGSORAN RUAS SP. GUNUNG KEMALA - SANGGI, RUAS BTS. KOTA LIWA - SP. GN. KEMALA,
RUAS BTS. BENGKULU - PUGUNG TAMPAK, RUAS BUKIT KEMUNING - PADANG TAMBAK
NO. KONTRAK :
TGL KONTRAK : Tuesday, August 10, 2021
NILAI KONTRAK : Rp 24,658,918,000.00
PENYEDIA : PT. GREEN DIAMOND INDONESIA
KONSULTAN SUPERVISI : PT. LARAS SEMBADA (KSO) PT. CIVARIGMA ENGINEERING CV. SKILLAND TECHNICIAL

HARGA KONTRAK HARGA PERKIRAAN


NO URAIAN PEKERJAAN SATUAN VOLUME
HARGA SATUAN JUMLAH HARGA SATUAN JUMLAH
I DIVISI 1 UMUM
1 Mobilisasi LS 1.00 Rp 258,401,997.75 Rp 258,401,997.75 Rp 200,000,000.00 Rp 200,000,000.00
2 Manajemen dan Keselamatan Lalu Lintas LS 1.00 Rp 26,450,000.00 Rp 26,450,000.00 Rp 25,000,000.00 Rp 25,000,000.00
3 Pengujian PH Buah 15.00 Rp 350,000.00 Rp 5,250,000.00 Rp 250,000.00 Rp 3,750,000.00
4 Pengujian Temperatur (Suhu) Buah 15.00 Rp 350,000.00 Rp 5,250,000.00 Rp 250,000.00 Rp 3,750,000.00
5 Pengujian Parameter Kualitas Air Lainnya Buah 15.00 Rp 350,000.00 Rp 5,250,000.00 Rp 250,000.00 Rp 3,750,000.00
6 Pengujian Parameter Kebisingan dan/atau Getaran Lainnya Buah 15.00 Rp 350,000.00 Rp 5,250,000.00 Rp 250,000.00 Rp 3,750,000.00
7 Pengujian Parameter Udara Emisi dan Ambian Lainnya Buah 15.00 Rp 350,000.00 Rp 5,250,000.00 Rp 250,000.00 Rp 3,750,000.00
8 Keselamatan dan Kesehatan Kerja LS 1.00 Rp 65,100,000.00 Rp 65,100,000.00 Rp 50,000,000.00 Rp 50,000,000.00
9 Manajemen Mutu LS 1.00 Rp 53,008,000.00 Rp 53,008,000.00 Rp 50,000,000.00 Rp 50,000,000.00
Rp 429,209,997.75 Rp 343,750,000.00
SELISIH Rp 85,459,997.75
II DIVISI 2 DRAINASE
1 Galian Untuk Selokan Drainase dan Saluran Air 393.08 Rp 68,731.39 Rp 27,016,934.78 Rp 68,731.39 Rp 27,016,934.78
2 Pasangan Batu dengan Mortar 182.49 Rp 838,293.94 Rp 152,980,261.11 Rp 838,293.94 Rp 152,980,261.11
3 Pipa Berlubang Banyak (Perforated Pipi) Drainase Bwh d. 6 inch 537.80 Rp 161,296.67 Rp 86,745,349.13 Rp 85,000.00 Rp 45,713,000.00
Rp 266,742,545.02 Rp 225,710,195.89
SELISIH Rp 41,032,349.13
III DIVISI 3 PEKERJAAN TANAH DAN GEOSINTETIK
1 Galian Biasa 6,321.74 Rp 32,092.45 Rp 202,880,124.86 Rp 56,000.00 Rp 354,017,440.00
2 Galian Perkerasan Beraspal tanpa Cold Miling Machine 34.65 Rp 402,367.12 Rp 13,942,020.71 Rp 275,000.00 Rp 9,528,750.00
3 Galian Perkerasan Berbutir 116.63 Rp 80,426.54 Rp 9,380,147.36 Rp 80,000.00 Rp 9,330,400.00
4 Timbunan Pilihan Dari Sumber Galian 3,563.68 Rp 168,242.23 Rp 599,561,470.21 Rp 210,000.00 Rp 748,372,800.00
Rp 825,763,763.14 Rp 1,121,249,390.00
SELISIH -Rp 295,485,626.86
V DIVISI 5 PERKERASAN BERBUTIR
1 Lapis Pondasi Agregat Kelas A M3 557.04 Rp 444,521.80 Rp 247,616,423.47 Rp 275,000.00 Rp 153,186,000.00
SELISIH Rp 94,430,423.47
VI DIVISI 6 PERKERASAN ASPAL
1 Lapis Resap Pengikat - Aspal Cair/Emulasi
2 Lapis Perekat - Aspal Cair/Emulasi
3 Laston Lapis Aus (AC-WC)
HARGA KONTRAK HARGA PERKIRAAN
NO URAIAN PEKERJAAN SATUAN VOLUME
HARGA SATUAN JUMLAH HARGA SATUAN JUMLAH
4 Laston Lapis Antara (AC-BC)
5 Laston Lapis Fondasi (AC-Base)
6 Bahan Anti Pengelupasan
VII DIVISI 7 STRUKTUR
Beon Struktur fc 30 Mpa
Beon Struktur fc 20 Mpa
Beton fc 15 Mpa
Baja Tulangan Sirip BjTS 420A
Fondasi Cerucuk, Penyediaan dan Pemancangan
Dinding Turap Baja, Penyediaan dan Pemancangan