I. PEKERJAAN PERSIAPAN
1 Pembersihan lokasi 1.00 ls Rp 2,500,000.00 Rp 275,000.00 Rp 2,775,000.00 Rp 2,273,400.00 Rp 250,074.00 Rp 2,523,474.00 Rp 2,273,400.00 Rp 250,074.00 Rp 2,523,474.00
2 Papan Nama Proyek uk. 80x120 (flexi) 1.00 unit Rp 465,953.00 Rp 51,254.83 Rp 517,207.83 Rp 450,000.00 Rp 49,500.00 Rp 499,500.00 Rp 450,000.00 Rp 49,500.00 Rp 499,500.00
3 Pekerjaan Pengukuran dan bowplank 1.00 ls Rp 500,000.00 Rp 55,000.00 Rp 555,000.00 Rp 450,000.00 Rp 49,500.00 Rp 499,500.00 Rp 450,000.00 Rp 49,500.00 Rp 499,500.00
4 Pekerjaan bongkaran 1.00 ls Rp 1,250,000.00 Rp 137,500.00 Rp 1,387,500.00 Rp 1,350,000.00 Rp 148,500.00 Rp 1,498,500.00 Rp 1,350,000.00 Rp 148,500.00 Rp 1,498,500.00
Rp 518,754.83 Rp 5,234,707.83 Rp 497,574.00 Rp 5,020,974.00 Rp 497,574.00 Rp 5,020,974.00
II. BIAYA PENYELENGGARAN K3 DAN KESELAMATAN KERJA KONSTRUKSI
BIAYA PENYELENGGARAN K3 DAN KESELAMATAN KERJA KONSTRUKSI (SMK3), me 1.00 Paket Rp 595,000.00 Rp 65,450.00 Rp 660,450.00 Rp 525,000.00 Rp 57,750.00 Rp 582,750.00 Rp 525,000.00 Rp 57,750.00 Rp 582,750.00
1 Alat Pelindung Diri terdiri atas :
- Sewa Topi Pelindung / Safety Helmet
- Sewa Sarung Tangan / Safety Gloves
- Sewa Rompi Keselamatan / Safety Vest
- Sewa Sepatu Keselamatan / Rubber Safety Shoes and
toe cap
- Masker
2 Fasilitas sarana kesehatan :
- Peralatan P3K (kotak P3K, obat-obat, obat luka, dll)
3 Rambu-rambu yang di perlukan :
- Rambu petunjuk
- Rambu informasi
Rp 65,450.00 Rp 660,450.00 Rp 57,750.00 Rp 582,750.00 Rp 57,750.00 Rp 582,750.00
III. PEKERJAAN TANAH DAN PASIR
1 Pekerjaan streping dan perataan tanah 402.72 m2 Rp 5,288.00 Rp 234,254.17 Rp 2,363,837.53 Rp 5,225.00 Rp 231,463.32 Rp 2,335,675.32 Rp 5,225.00 Rp 231,463.32 Rp 2,335,675.32
2 Mengurug tanah, pintu masuk 3.32 m3 Rp 229,732.00 Rp 83,898.13 Rp 846,608.37 Rp 230,179.00 Rp 84,061.37 Rp 848,255.65 Rp 230,179.00 Rp 84,061.37 Rp 848,255.65
3 Mengurug pasir bawah paving 20.13 m3 Rp 245,049.00 Rp 542,612.00 Rp 5,475,448.37 Rp 248,735.00 Rp 550,773.91 Rp 5,557,809.46 Rp 248,735.00 Rp 550,773.91 Rp 5,557,809.46
Rp 860,764.30 Rp 8,685,894.27 Rp 866,298.60 Rp 8,741,740.43 Rp 866,298.60 Rp 8,741,740.43
IV. PEKERJAAN BETON
1 Cor beton tutup saluran
Beton mutu f'c = 14,8 Mpa 2.84 m3 Rp 1,076,873.88 Rp 336,415.40 Rp 3,394,737.22 Rp 1,056,245.00 Rp 329,970.94 Rp 3,329,706.74 Rp 1,056,245.00 Rp 329,970.94 Rp 3,329,706.74
Pembesian dengan besi polos 505.80 kg Rp 16,629.00 Rp 925,204.30 Rp 9,336,152.50 Rp 16,834.00 Rp 936,610.09 Rp 9,451,247.29 Rp 16,834.00 Rp 936,610.09 Rp 9,451,247.29
Bekisting 23.74 m2 Rp 258,945.00 Rp 676,208.97 Rp 6,823,563.27 Rp 256,454.00 Rp 669,703.98 Rp 6,757,921.94 Rp 256,454.00 Rp 669,703.98 Rp 6,757,921.94
Membongkar cetakan 23.74 m2 Rp 4,231.00 Rp 11,048.83 Rp 111,492.77 Rp 4,224.00 Rp 11,030.55 Rp 111,308.31 Rp 4,224.00 Rp 11,030.55 Rp 111,308.31
2 Cor beton pengunci
Beton mutu f'c = 14,8 Mpa 1.03 m3 Rp 1,076,873.88 Rp 122,009.81 Rp 1,231,189.91 Rp 1,067,137.94 Rp 120,906.73 Rp 1,220,058.80 Rp 1,067,137.94 Rp 120,906.73 Rp 1,220,058.80
Bekisting 13.78 m2 Rp 202,236.00 Rp 306,549.33 Rp 3,093,361.41 Rp 201,553.00 Rp 305,514.04 Rp 3,082,914.38 Rp 201,553.00 Rp 305,514.04 Rp 3,082,914.38
Membongkar cetakan 13.78 m2 Rp 4,231.00 Rp 6,413.35 Rp 64,716.53 Rp 4,224.00 Rp 6,402.74 Rp 64,609.46 Rp 4,224.00 Rp 6,402.74 Rp 64,609.46
3 Cor rabat beton
Beton mutu f'c = 14,8 Mpa 1.23 m3 Rp 1,076,873.88 Rp 145,701.04 Rp 1,470,255.91 Rp 1,067,137.94 Rp 144,383.76 Rp 1,456,963.42 Rp 1,067,137.94 Rp 144,383.76 Rp 1,456,963.42
PAJAK PAJAK PAJAK
NO. URAIAN PEKERJAAN VOLUME HARGA SATUAN HARGA TOTAL HARGA SATUAN HARGA TOTAL HARGA SATUAN HARGA TOTAL
11% 11% 11%
Rp 2,529,551.03 Rp 25,525,469.52 Rp 2,524,522.83 Rp 25,474,730.34 Rp 2,524,522.83 Rp 25,474,730.34
V. PEKERJAAN PASANGAN
1 Pemasangan pondasi batu belah campuran 1SP : 6PP 0.76 m3 Rp 906,430.00 Rp 75,777.55 Rp 764,664.35 Rp 907,566.00 Rp 75,872.52 Rp 765,622.68 Rp 907,566.00 Rp 75,872.52 Rp 765,622.68
2 Pemasangan paving block natural tebal 6 cm 402.72 m2 Rp 211,544.00 Rp 9,371,229.96 Rp 94,564,229.64 Rp 210,100.00 Rp 9,307,261.92 Rp 93,918,733.92 Rp 210,100.00 Rp 9,307,261.92 Rp 93,918,733.92
3 Perbaikan paving block eksisting 1.00 ls Rp 4,586,946.00 Rp 504,564.06 Rp 5,091,510.06 Rp 4,175,000.00 Rp 459,250.00 Rp 4,634,250.00 Rp 4,175,000.00 Rp 459,250.00 Rp 4,634,250.00
Rp 9,951,571.57 Rp 100,420,404.05 Rp 9,842,384.44 Rp 99,318,606.60 Rp 9,842,384.44 Rp 99,318,606.60
PAJAK PAJAK PAJAK
NO. URAIAN PEKERJAAN VOLUME HARGA SATUAN HARGA TOTAL HARGA SATUAN HARGA TOTAL HARGA SATUAN HARGA TOTAL
11% 11% 11%
VI. PEKERJAAN BESI DAN ATAP
1 Pemasangan pintu dorong besi siku L 5.5.4mm - besi beton dia. 12 mm, finising c 1.00 unit Rp 7,164,497.00 Rp 788,094.67 Rp 7,952,591.67 Rp 7,165,000.00 Rp 788,150.00 Rp 7,953,150.00 Rp 7,165,000.00 Rp 788,150.00 Rp 7,953,150.00
2 Pemasangan rangka atap baja ringan C.75/75 dengan tiang baja ringan 2xC.75/7 78.60 m2 Rp 213,900.00 Rp 1,849,379.40 Rp 18,661,919.40 Rp 219,755.00 Rp 1,900,001.73 Rp 19,172,744.73 Rp 219,755.00 Rp 1,900,001.73 Rp 19,172,744.73
3 Pemasangan penutup atap galvalum 80.00 m2 Rp 78,650.00 Rp 692,120.00 Rp 6,984,120.00 Rp 89,000.00 Rp 783,200.00 Rp 7,903,200.00 Rp 78,650.00 Rp 692,120.00 Rp 6,984,120.00
4 Perbaikan genteng pecah / bocor 1.00 ls Rp 448,932.84 Rp 49,382.61 Rp 498,315.45 Rp 400,000.00 Rp 44,000.00 Rp 444,000.00 Rp 400,000.00 Rp 44,000.00 Rp 444,000.00
Rp 3,378,976.68 Rp 34,096,946.52 Rp 3,515,351.73 Rp 35,473,094.73 Rp 3,424,271.73 Rp 34,554,014.73
VII. PEKERJAAN KM/WC
1 Pemasangan grendel pintu 2.00 bh Rp 65,623.00 Rp 14,437.06 Rp 145,683.06 Rp 65,500.00 Rp 14,410.00 Rp 145,410.00 Rp 65,500.00 Rp 14,410.00 Rp 145,410.00
2 Pemasangan handel pintu 2.00 bh Rp 77,597.00 Rp 17,071.34 Rp 172,265.34 Rp 75,225.00 Rp 16,549.50 Rp 166,999.50 Rp 75,225.00 Rp 16,549.50 Rp 166,999.50
Rp 31,508.40 Rp 317,948.40 Rp 30,959.50 Rp 312,409.50 Rp 30,959.50 Rp 312,409.50
JUMLAH TOTAL Rp 174,941,820.00 Rp 174,924,305.00 Rp 174,005,225.00
Terbilang : Seratus tujuh puluh empat juta sembilan ratus dua puluh empat ribu tiga ratus
lima rupiah
I. PEKERJAAN PERSIAPAN
1 Pembersihan lokasi 1.00 ls Rp 2,273,400.00 Rp 2,273,400.00
2 Papan Nama Proyek uk. 80x120 (flexi) 1.00 unit Rp 450,000.00 Rp 450,000.00
3 Pekerjaan Pengukuran dan bowplank 1.00 ls Rp 450,000.00 Rp 450,000.00
4 Pekerjaan bongkaran 1.00 ls Rp 1,350,000.00 Rp 1,350,000.00
Rp 4,523,400.00
II. BIAYA PENYELENGGARAN K3 DAN KESELAMATAN KERJA KONSTRUKSI
BIAYA PENYELENGGARAN K3 DAN KESELAMATAN KERJA KONSTRUKSI (SMK3), melipu 1.00 Paket Rp 525,000.00 Rp 525,000.00
1 Alat Pelindung Diri terdiri atas :
- Sewa Topi Pelindung / Safety Helmet
- Sewa Sarung Tangan / Safety Gloves
- Sewa Rompi Keselamatan / Safety Vest
- Sewa Sepatu Keselamatan / Rubber Safety Shoes and
toe cap
- Masker
2 Fasilitas sarana kesehatan :
- Peralatan P3K (kotak P3K, obat-obat, obat luka, dll)
3 Rambu-rambu yang di perlukan :
- Rambu petunjuk
- Rambu informasi
Rp 525,000.00
III. PEKERJAAN TANAH DAN PASIR
1 Pekerjaan streping dan perataan tanah 402.72 m2 Rp 5,225.00 Rp 2,104,212.00
2 Mengurug tanah, pintu masuk 3.32 m3 Rp 230,179.00 Rp 764,194.28
3 Mengurug pasir bawah paving 20.13 m3 Rp 248,735.00 Rp 5,007,035.55
Rp 7,875,441.83
IV. PEKERJAAN BETON
1 Cor beton tutup saluran
Beton mutu f'c = 14,8 Mpa 2.84 m3 Rp 1,056,245.00 Rp 2,999,735.80
Pembesian dengan besi polos 505.80 kg Rp 16,834.00 Rp 8,514,637.20
Bekisting 23.74 m2 Rp 256,454.00 Rp 6,088,217.96
Membongkar cetakan 23.74 m2 Rp 4,224.00 Rp 100,277.76
2 Cor beton pengunci
Beton mutu f'c = 14,8 Mpa 1.03 m3 Rp 1,067,137.94 Rp 1,099,152.07
Bekisting 13.78 m2 Rp 201,553.00 Rp 2,777,400.34
Membongkar cetakan 13.78 m2 Rp 4,224.00 Rp 58,206.72
3 Cor rabat beton
Beton mutu f'c = 14,8 Mpa 1.23 m3 Rp 1,067,137.94 Rp 1,312,579.66
Rp 22,950,207.52
V. PEKERJAAN PASANGAN
1 Pemasangan pondasi batu belah campuran 1SP : 6PP 0.76 m3 Rp 907,566.00 Rp 689,750.16
2 Pemasangan paving block natural tebal 6 cm 402.72 m2 Rp 210,100.00 Rp 84,611,472.00
3 Perbaikan paving block eksisting 1.00 ls Rp 4,175,000.00 Rp 4,175,000.00
Rp 89,476,222.16
VI. PEKERJAAN BESI DAN ATAP
1 Pemasangan pintu dorong besi siku L 5.5.4mm - besi beton dia. 12 mm, finising cat be 1.00 unit Rp 7,165,000.00 Rp 7,165,000.00
2 Pemasangan rangka atap baja ringan C.75/75 dengan tiang baja ringan 2xC.75/75 78.60 m2 Rp 219,755.00 Rp 17,272,743.00
3 Pemasangan penutup atap galvalum 80.00 m2 Rp 89,000.00 Rp 7,120,000.00
4 Perbaikan genteng pecah / bocor 1.00 ls Rp 400,000.00 Rp 400,000.00
Rp 31,957,743.00
VII. PEKERJAAN KM/WC
1 Pemasangan grendel pintu 2.00 bh Rp 65,500.00 Rp 131,000.00
2 Pemasangan handel pintu 2.00 bh Rp 75,225.00 Rp 150,450.00
Rp 281,450.00
DAFTAR HARGA SATUAN BAHAN DAN UPAH
BAHAN
1 Air PDAM ltr Rp 58.00 Pemakaian diatas 20 m³
2 Batu belah hitam m3 Rp 247,720.00
3 Besi beton kg Rp 12,800.00
4 Besi Profil kg Rp 17,000.00
5 Cat besi kg Rp 68,000.00
6 Minyak cat ltr Rp 22,500.00
7 Kuas bh Rp 14,000.00
8 Dolken kayu dia 8-10 cm btg Rp 16,000.00
9 Handel pintu bh Rp 47,000.00
10 Kawat beton kg Rp 19,000.00
11 Kawat las listrik kg Rp 39,500.00
12 Kayu meranti begesting m3 Rp 4,487,000.00
13 Kerikil beton m3 Rp 281,930.00
14 Kans teen bh Rp 35,000.00
15 Minyak bekisting ltr Rp 19,000.00
16 Minyak pelumas ltr Rp 40,000.00
17 Multiplek 9 mm lbr Rp 132,000.00
18 Paku besar, sedang kg Rp 17,850.00
19 Pasir beton m3 Rp 264,607.00
20 Pasir pasang m3 Rp 287,267.00
21 Pasir urug m3 Rp 166,860.00
22 Paving block 6 cm segi empat natural, K-200 m2 Rp 93,000.00
23 Plamir kg Rp 36,000.00
24 Print outdoor flexi m2 Rp 20,000.00
25 Grendel pintu bh Rp 42,000.00
26 Semen Portland kg Rp 1,276.00
27 Solar ltr Rp 10,200.00
28 Tanah urug m3 Rp 150,000.00
ANALISA HARGA SATUAN
Membuat Papan Nama Proyek 80x120 cm (bahan flexi)
Harga Satuan
No Uraian Kode Satuan Koefisien (Rp)
A Tenaga
1 Pekerja L.01 oh 1.0000 86,160
2 Tukang batu L.02 oh 0.0175 96,000
3 Tukang kayu L.02 oh 1.0000 98,000
4 Mandor L.04 oh 0.1000 100,000
Jumlah Harga Tenaga Kerja
B Bahan
1 Kayu meranti m3 0.0350 4,487,000
2 Print outdoor flexi m2 1.0000 20,000
3 Paku kg 0.6000 17,850
4 PC kg 16.8000 1,276
5 Pasir beton m3 0.0270 264,607
6 Kerikil beton m3 0.0405 281,930
Jumlah Harga Bahan
C Peralatan
A TENAGA
Pekerja L.01 OH 0.050 86,160
Mandor L.04 OH 0.005 100,000
JUMLAH TENAGA KERJA
B BAHAN
Mengurug tanah m3
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja L.01 oh 0.3000 86,160
2 Mandor L.02 oh 0.0300 100,000
Jumlah Harga Tenaga Kerja
B Bahan
1 tanah urug m3 1.2000 150,000
Jumlah Harga Bahan
C Peralatan
Mengurug pasir
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja L.01 oh 0.2500 86,160
2 Mandor L.02 oh 0.0100 100,000
Jumlah Harga Tenaga Kerja
B Bahan
1 Pasir urug kg 1.2000 166,860
Jumlah Harga Bahan
C Peralatan
A TENAGA
Pekerja L.01 OH 0.06 86,160
Tukang cat L.02 OH 0.06 90,000
Kepala tukang L.03 OH 0.012 101,000
Mandor L.04 OH 0.003 100,000
JUMLAH TENAGA KERJA
B BAHAN
Cat Kg 0.30 68,000
Kwas buah 0.01 14,000
Pengencer L 0.01 22,500
JUMLAH HARGA BAHAN
C PERALATAN
1 Sewa alat bantu ls 1.000 8,500
JUMLAH HARGA ALAT
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C )
E Overhead & Profit 10% xD
F Harga Satuan Pekerjaan ( D + E )
Jumlah
(Rp)
86,160.00
1,680.00
98,000.00
10,000.00
195,840.00
157,045.00
20,000.00
10,710.00
21,436.80
7,144.39
11,418.17
227,754.35
-
-
423,594.35
42,359.44
465,953.00
4,308.00
500.00
4,808.00
-
-
4,808.00
480.80
5,288.00
Jumlah
(Rp)
7
25,848.00
3,000.00
28,848.00
180,000.00
180,000.00
-
-
208,848.00
20,884.80
229,732.00
Jumlah
(Rp)
7
21,540.00
1,000.00
22,540.00
200,232.00
200,232.00
-
-
222,772.00
22,277.20
245,049.00
129,240.00
72,000.00
7,575.00
7,500.00
216,315.00
297,264.00
149,292.00
161,156.79
607,712.79
-
-
824,027.79
82,402.78
906,430.00
19,550.00
19,550.00
-
-
31,445.60
3,144.56
34,590.00
8,616.00
9,700.00
101.00
500.00
18,917.00
10,200.00
4,000.00
14,200.00
4,000.00
4,000.00
18,200.00
1,820.00
20,020.00
200.00
3,446.40
1,940.00
202.00
200.00
5,788.40
15,800.00
3,060.00
1,600.00
20,460.00
-
-
36,260.00
3,626.00
39,886.00
3,988.00
Jumlah
(Rp)
25,848.00
9,800.00
1,060.00
1,500.00
38,208.00
-
-
-
-
38,208.00
3,820.80
42,028.00
1,723.20
19,600.00
2,120.00
100.00
23,543.20
47,000.00
47,000.00
-
-
70,543.20
7,054.32
77,597.00
1,292.40
14,700.00
1,590.00
75.00
17,657.40
42,000.00
42,000.00
-
-
59,657.40
5,965.74
65,623.00
5,169.60
5,400.00
1,212.00
300.00
12,081.60
20,400.00
140.00
225.00
20,765.00
8,500.00
8,500.00
41,346.60
4,134.66
45,481.00
21,540.00
48,000.00
5,050.00
130.00
74,720.00
93,930.00
14,363.35
108,293.35
9,300.00
9,300.00
192,313.35
19,231.34
211,544.00
Jumlah
(Rp)
2,154.00
240.00
25.25
125.00
2,544.25
73,500.00
746.46
74,246.46
-
-
76,790.71
7,679.07
84,469.00
Jumlah
(Rp)
546,771.36
615,562.00
64,094.60
31,730.00
1,258,157.96
471,372.63
3,570,952.00
1,212,697.39
5,255,022.01
-
-
6,513,179.97
651,318.00
7,164,497.00
ANALISA HARGA SATUAN BETON
PEKERJAAN BETON
1 m3 Membuat beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja oh 1.6500 86,160
2 Tukang batu oh 0.2750 96,000
3 Kepala tukang oh 0.0280 101,000
4 Mandor oh 0.0830 100,000
Jumlah Harga Tenaga Kerja
B Bahan
1 Portland Cement kg 247.0000 1,276
2 Pasir beton m3 0.6207 287,267
3 Kerikil beton (maksimum 30 mm) m3 0.7400 281,930
4 Air Liter 215.0000 58
Jumlah Harga Bahan
C Peralatan
1 m3 Beton mutu f'c = 14,8 Mpa (K 175), slump (12 ± 2) cm, w/c = 0,66
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6
A Tenaga Kerja
1 Pekerja oh 1.6500 86,160
2 Tukang batu oh 0.2750 96,000
3 Kepala tukang oh 0.0280 101,000
4 Mandor oh 0.0830 100,000
Jumlah Harga Tenaga Kerja
B Bahan
1 Portland Cement kg 326.0000 1,276
2 Pasir beton m3 0.5429 287,267
3 Kerikil beton (maksimum 30 mm) m3 0.7622 281,930
4 Air Liter 215.0000 58
Jumlah Harga Bahan
C Peralatan
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja oh 0.0070 86,160
2 Tukang besi oh 0.0070 97,000
3 Kepala tukang oh 0.0007 101,000
4 Mandor oh 0.0004 100,000
Jumlah Harga Tenaga Kerja
B Bahan
1 Besi beton kg 1.0500 12,800
2 Kawat beton kg 0.0150 19,000
Jumlah Harga Bahan
C Peralatan
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja oh 0.5200 86,160
2 Tukang kayu oh 0.2600 98,000
3 Kep. Tk. Kayu oh 0.0260 106,000
4 Mandor oh 0.0260 100,000
Jumlah Harga Tenaga Kerja
B Bahan
1 Kayu kelas III ( 2 X pakai ) m3 0.0225 4,487,000
2 Paku 5 cm - 10 cm m3 0.3000 17,850
3 Minyak bekisting ltr 0.1000 19,000
Jumlah Harga Bahan
C Peralatan
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja oh 0.6600 86,160
2 Tukang kayu oh 0.3300 98,000
3 Kep. Tk. Kayu oh 0.0330 106,000
4 Mandor oh 0.0330 100,000
Jumlah Harga Tenaga Kerja
B Bahan
1 Kayu kelas III ( 3 X pakai ) m3 0.0133 4,487,000
2 Paku 5 cm - 12 cm m3 0.4000 17,850
3 Minyak bekisting ltr 0.2000 19,000
4 Balok kayu kelas III ( 3 X pakai ) m3 0.0050 4,487,000
5 Multiplek 9 mm lbr 0.3500 132,000
Jumlah Harga Bahan
C Peralatan
-
Jumlah Harga Peralatan
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C )
E Overhead + Profit 10% 235,405
F Harga Satuan Pekerjaan ( D + E )
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja oh 0.0400 86,160
2 Mandor oh 0.0040 100,000
Jumlah Harga Tenaga Kerja
B Bahan
Jumlah
(Rp)
7
142,164.00
26,400.00
2,828.00
8,300.00
179,692.00
315,172.00
178,306.63
208,628.20
12,470.00
714,576.83
-
-
894,268.83
89,426.88
983,695.00
Jumlah
(Rp)
7
142,164.00
26,400.00
2,828.00
8,300.00
179,692.00
415,976.00
155,944.94
214,893.31
12,470.00
799,284.25
-
-
978,976.25
97,897.63
1,076,873.88
Jumlah
(Rp)
7
603.12
679.00
70.70
40.00
1,392.82
13,440.00
285.00
13,725.00
-
-
15,117.82
1,511.78
16,629.00
Jumlah
(Rp)
7
44,803.20
25,480.00
2,756.00
2,600.00
75,639.20
100,957.50
5,355.00
1,900.00
108,212.50
-
-
183,851.70
18,385.17
202,236.00
Jumlah
(Rp)
7
56,865.60
32,340.00
3,498.00
3,300.00
96,003.60
59,826.67
7,140.00
3,800.00
22,435.00
46,200.00
139,401.67
-
-
235,405.27
23,540.53
258,945.00
Jumlah
(Rp)
7
3,446
400.00
3,846.40
-
-
-
-
3,846.40
384.64
4,231.00
ANALISA HARGA SATUAN ME
Koefisien Sat Uraian Harga Satuan Jumlah Harga Harga Total
1.000 BH PANEL AC 01
1.000 bh - MCB 3ph 35A 10kA = Rp. 375,000.00 = Rp. 375,000.00
12.000 bh - MCB 1ph 16A 10kA = Rp. 55,000.00 = Rp. 660,000.00
3.000 bh - Indikator Lamp dan Fuse = Rp. 11,000.00 = Rp. 33,000.00
1.000 bh - Box panel 30x40cm, Acsesiories & wirring = Rp. 750,000.00 = Rp. 750,000.00
4.000 m - Grounding BC 35mm = Rp. 55,000.00 = Rp. 220,000.00
1.000 ls - Upah pasang = Rp. 89,000.00 = Rp. 89,000.00
Jumlah = Rp. 2,127,000.00
Overhead + Profit 10% = Rp. 212,700.00
Harga Satuan Pekerjaan = Rp. 2,339,700.00
PEMASANGAN KABEL BC 50
1 unit Kabel BC 50 @ Rp. 72,000.00 = Rp. 72,000.00
1 unit Perlengkapan @ Rp. 7,200.00 = Rp. 7,200.00
= Rp. 79,200.00
0.4 oh Pekerja @ Rp. 86,160.00 = Rp. 34,464.00
0.5 oh Tukang @ Rp. 96,000.00 = Rp. 48,000.00
0.09 oh Kepala Tukang @ Rp. 101,000.00 = Rp. 9,090.00
0.03 oh Mandor @ Rp. 100,000.00 = Rp. 3,000.00
= Rp. 94,554.00
Jumlah = Rp. 173,754.00
Overhead + Profit 10% = Rp. 17,375.40
Harga Satuan Pekerjaan = Rp. 191,129.00
FLOORDRAIN 3"
1 m Floordrain 3" @ Rp. 120,000.00 = Rp. 120,000.00 onda
1 ls perlengkapan @ Rp. 12,000.00 = Rp. 12,000.00
= Rp. 132,000.00
0.1 oh Pekerja @ Rp. 86,160.00 = Rp. 8,616.00
0.14 oh Tukang @ Rp. 96,000.00 = Rp. 13,440.00
0.015 oh Kepala Tukang @ Rp. 101,000.00 = Rp. 1,515.00
0.004 oh Mandor @ Rp. 100,000.00 = Rp. 400.00
= Rp. 23,971.00
Jumlah = Rp. 155,971.00
Overhead + Profit 10% = Rp. 15,597.10
Harga Satuan Pekerjaan = Rp. 171,568.00
1 UNIT WASTAFEL
1 bh wastafel @ Rp. 370,000.00 = Rp. 370,000.00
1 ls Perlengkapan @ Rp. 44,400.00 = Rp. 44,400.00
6 kg semen abu-abu @ Rp. 1,276.00 = Rp. 7,656.00
0.01 m3 Pasir pasang @ Rp. 287,267.00 = Rp. 2,872.67
= Rp. 414,400.00
0.5 oh Pekerja @ Rp. 86,160.00 = Rp. 43,080.00
0.2 oh Tukang @ Rp. 96,000.00 = Rp. 19,200.00
0.02 oh Kepala Tukang @ Rp. 101,000.00 = Rp. 2,020.00
0.005 oh Mandor @ Rp. 100,000.00 = Rp. 500.00
= Rp. 64,800.00
Jumlah = Rp. 479,200.00
Overhead + Profit 10% = Rp. 47,920.00
Harga Satuan Pekerjaan = Rp. 527,120.00
1 KLOSET JONGKOK
1 bh Kloset jongkok @ Rp. 260,000.00 = Rp. 260,000.00
6 bh Semen portland @ Rp. 1,276.00 = Rp. 7,656.00
0.01 ls Pasir pasang @ Rp. 287,267.00 = Rp. 2,872.67
= Rp. 262,872.67
1 oh Pekerja @ Rp. 86,160.00 = Rp. 86,160.00
1.5 oh Tukang @ Rp. 96,000.00 = Rp. 144,000.00
0.15 oh Kepala Tukang @ Rp. 101,000.00 = Rp. 15,150.00
0.16 oh Mandor @ Rp. 100,000.00 = Rp. 16,000.00
= Rp. 261,310.00
Jumlah = Rp. 524,182.67
Overhead + Profit 10% = Rp. 52,418.27
Harga Satuan Pekerjaan = Rp. 576,600.00
1 KLOSET DUDUK
1 bh Kloset duduk @ Rp. 1,220,000.00 = Rp. 1,220,000.00
1 ls Perlengkapan @ Rp. 73,200.00 = Rp. 73,200.00
= Rp. 1,293,200.00
3.3 oh Pekerja @ Rp. 86,160.00 = Rp. 284,328.00
1.1 oh Tukang @ Rp. 96,000.00 = Rp. 105,600.00
0.011 oh Kepala Tukang @ Rp. 101,000.00 = Rp. 1,111.00
0.16 oh Mandor @ Rp. 100,000.00 = Rp. 16,000.00
= Rp. 407,039.00
Jumlah = Rp. 1,700,239.00
Overhead + Profit 10% = Rp. 170,023.90
Harga Satuan Pekerjaan = Rp. 1,870,262.00
1 URINOIR
1 bh Urinoir @ Rp. 1,800,000.00 = Rp. 1,800,000.00 INA U114N
1 ls Perlengkapan @ Rp. 108,000.00 = Rp. 108,000.00
= Rp. 1,908,000.00
3.3 oh Pekerja @ Rp. 86,160.00 = Rp. 284,328.00
1.1 oh Tukang @ Rp. 96,000.00 = Rp. 105,600.00
0.011 oh Kepala Tukang @ Rp. 101,000.00 = Rp. 1,111.00
0.16 oh Mandor @ Rp. 100,000.00 = Rp. 16,000.00
= Rp. 407,039.00
Jumlah = Rp. 2,315,039.00
Overhead + Profit 10% = Rp. 231,503.90
Harga Satuan Pekerjaan = Rp. 2,546,542.00
BIOFIL BF-08
1 bh Biofil BF-08 @ Rp. 8,600,000.00 = Rp. 8,600,000.00
1 ls Perlengkapan @ Rp. 516,000.00 = Rp. 516,000.00
3.6 m3 Galian @ Rp. 43,500.00 = Rp. 156,600.00
0.6 m3 Urug kembali @ Rp. 16,000.00 = Rp. 9,600.00
= Rp. 9,282,200.00
3.3 oh Pekerja @ Rp. 86,160.00 = Rp. 284,328.00
1.1 oh Tukang @ Rp. 96,000.00 = Rp. 105,600.00
0.011 oh Kepala Tukang @ Rp. 101,000.00 = Rp. 1,111.00
0.16 oh Mandor @ Rp. 100,000.00 = Rp. 16,000.00
= Rp. 407,039.00
Jumlah = Rp. 9,689,239.00
Overhead + Profit 10% = Rp. 968,923.90
Harga Satuan Pekerjaan = Rp. 10,658,162.00
Matrial Bantu
8 bh Klem tembaga @ Rp. 25,000.00 = Rp. 200,000.00
1 ls Materia Bantu @ Rp. 150,000.00 = Rp. 150,000.00
1 ls Upah pasang @ Rp. 60,000.00 = Rp. 60,000.00
= Rp. 410,000.00
Jumlah = Rp. 410,000.00
Overhead + Profit 10% = Rp. 41,000.00
Harga Satuan Pekerjaan = Rp. 451,000.00
Rp -
Rp -
Rp -
Rp -
Rp -
Rp 105,000.00
Rp -
Rp 27,500.00
Rp -
Rp 87,500.00
Rp 130,000.00
Rp -
Rp 15,000.00
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp 150,000.00
Rp 40,000.00
Rp -
Rp -
Rp 40,000.00
Rp -
Rp -
Rp -
595,000.00
BACKUP VOLUME
I. PEKERJAAN PERSIAPAN
1 Pembersihan lokasi
2 Papan Nama Proyek uk. 80x120 (flexi)
3 Pekerjaan Pengukuran dan bowplank
4 Pekerjaan bongkaran
V. PEKERJAAN PASANGAN
1 Pemasangan pondasi batu belah campuran 1SP : 6PP 0.40 0.50 3.80
2 Pemasangan paving block natural tebal 6 cm 1 3.07 5.15 2.00 4.11 5
4.50 5.15
2 12.95 5.45
3 5.00 3.70
5.00 5.25
4 4.00 15.50
5 13.70 8.00
6 21.50 3.05
3.25 2.00
3 Perbaikan paving block eksisting
NO. URAIAN PEKERJAAN KODE
JUMLAH TOTAL
VOLUME
VOL INT
1.00 Paket
6.50
1.00 1.00 1.00 ls
VOLUME
VOL INT
B. URUTAN KERJA
1 Penyedia memobilisasi peralatan pengeboran kelokasi yang
telah disetujui oleh PPK
2 Pengeboran dilakukan dengan mengambil SPT dan sampel
tanah terganggu (Disturb) dengan interval mak.2 meter atau
setiap ada perubahan strata tanah
3 Benda uji diambil dan dilakukan pengujian laboratorium
Pengeboran dilakukan hingga mencapai tanah keras atau
SPT hingga nilai >40
4 Dibuat laporan hasil pengujian
D. TENAGA/PERSONIL
Estimasi kedalaman boring per titik M 9.00
1 Tenaga Ahli Pengeboran OH 2.00 110,990.00 221,980.00
2 Tenaga Pendukung OH 4.00 102,190.00 408,760.00
3 Mobilisasi dan Demobilisasi Tenaga Ls 1.00 100,000.00 100,000.00
I. PEKERJAAN ELEKTRIKAL
1 Panel LT.01
- MCCB 3ph 20A MCCB EZC / Breaker EasyPact Schneider EZC100F 3P 20A
- MCB 1ph 10A 4.5kA Schneider
- MCB 1ph 4A 4.5kA Schneider
- MCB 1ph 6A 4.5kA Schneider
- Indikator Lamp dan Fuse
- Box Panel 400x600x250mm, Acsesiories & wirring
- Surge Arresster
- Grounding BC 50mm
2 Panel LT.02
- MCCB 3ph 20A MCCB EZC / Breaker EasyPact Schneider EZC100F 3P 20A Schneider
- MCB 1ph 4A 4.5kA Schneider Schneider
- MCB 1ph 6A 4.5kA Schneider Schneider
- MCB 1ph 10A 4.5kA Schneider Schneider
- Indikator Lamp dan Fuse
- Box Panel 400x600x250mm, Acsesiories & wirring
- Surge Arresster
- Grounding BC 50mm
3 Panel SDP
- MCCB 3ph 35A MCCB EZC / Breaker EasyPact Schneider EZC100F 3P 35A Schneider
- MCCB 3ph 20A MCCB EZC / Breaker EasyPact Schneider EZC100F 3P 20A Schneider
- Indikator Lamp dan Fuse
- Volmeter 0 -500V
- Amperemeter 0 - 150A
- CT 1.000A/5A
- Surge Arresster
- Box panel 400x600x250mm, Acsesiories & wirring
- Grounding BC 50mm
4 Pasang daya baru 16500 VA PLN
I.2 PEKERJAAN INSTALASI PENERANGAN DAN DAYA
Lantai I
1 Instalasi Titik Lampu Dengan Kabel NYY 2 X 2,5 MM SUPREME. KABELINDO
2 Instalasi Titik Stop Kontak 300 WATT Dengan Kabel NYY 2 X 2,5 MM SUPREME. KABELINDO
3 Lampu LED 9w Downlight UKURAN 5 INCH / E 27 SANLY
4 Lampu LED 13w Downlight UKURAN 5 INCH / E 27 SANLY
5 Lampu RM 2x9 W LED RM 2X9 Watt LED
6 Saklar tunggal 250 Volt 10 A BROCO
7 Saklar seri 250 Volt 10 A BROCO
8 Stop kontak daya 250 Volt 10 A BROCO
9 Stop kontak AC Broco
Lantai 2
1 Instalasi Titik Lampu Dengan Kabel NYY 2 X 2,5 MM SUPREME. KABELINDO
2 Instalasi Titik Stop Kontak 300 W Dengan Kabel NYY 2 X 2,5 MM SUPREME. KABELINDO
3 Lampu LED 9w Downlight Sanly 5.0 Inch/E-27 UKURAN 5 INCH / E 27 SANLY
4 Lampu LED 13w Downlight Sanly 5.0 Inch/E-27 UKURAN 5 INCH / E 27 SANLY
5 Lampu Panel LED 23w Downlight 8 inch SANLY
6 Lampu RM 2x9 W LED RM 2X9 Watt LED SANLY
7 Saklar tunggal Broco 250 Volt 10 A BROCO
8 Saklar seri Broco 250 Volt 10 A BROCO
9 Stop kontak daya Broco 250 Volt 10 A BROCO
10 Stop kontak AC Broco 250 Volt 10 A BROCO
11 Testing & Commissioning pekerjaan elektrikal
I.3 PEKERJAAN TELEPON
Lantai I
1 Outlet telephon dinding
2 Instalasi telepon
Lantai 2
1 Outlet telephon dinding
2 Instalasi telepon