A. PEKERJAAN PERSIAPAN
1 Persiapan LS 1,00 Rp 9.459.989,00 Rp 9.459.989,019 Rp 6,435 1,073 1,073 1,073 1,073 1,073 1,073
A. PEKERJAAN PERSIAPAN
1 Persiapan Ls 1,00 Rp 19.325.575,25 Rp 19.325.575,250 Rp 13,147 2,191 2,191 2,191 2,191 2,191 2,191
B. PEKERJAAN DEMARKASI
1 Pengecatan Marka Pejalan Kaki m2 242,64 Rp 211.991,00 Rp 51.437.496,240 Rp 34,991 8,748 8,748 8,748 8,748
2 Pengecatan Kanstin Exsisting m2 49,50 Rp 123.613,50 Rp 6.118.868,250 Rp 4,162 2,081 2,081
3 Pengecatan Marka Area Loading Unloading Dock m2 15,00 Rp 211.991,00 Rp 3.179.865,000 Rp 2,163 1,082 1,082
4 Pengecatan marka area parkir motor mengacu STD SRP Motor = 2 x 0,8meter m2 13,86 Rp 211.991,00 Rp 2.938.195,260 Rp 1,999 0,999 0,999