KUSEN

BANK DARAH
KUSEN (M3/M') PINTU (M2) JENDELA UNGKIT (M2) JENDELA

NO. A SUB TOTAL SUB TOTAL SUB TOTAL SUB TOTAL A TOTAL KACA 6mm A TOTAL KACA KACA MATI
JENIS / TYPE PANJANG VOLUME
KUSEN (M')
.
(M") KACA 12mm KACA 6mm PINTU PANIL PINTU PANIL . PINTU UNGKIT . UNGKIT TEMPERED
X TMPRED (M2) polos (M2) ALUM. (M2) MELAMIK (M2) X (M2) (M2) X (M2) 8mm (M2)
LANTAI 1
1 P2J 17.17 1 17.17 - 1.47 - - 2 2.94 1.13 2 2.26 -

2 PJ2 12.40 1 12.40 - 1.68 - - 1 1.68 - 0 0 -

3 P2 8.45 4 33.80 - 1.47 - - 8 11.76 - 0 0 -

4 P1 6.90 2 13.80 - 1.68 - - 2 3.36 - 0 0 -

5 P1i 5.10 2 10.20 - - 1.47 - 2 2.94 - 0 0 -

6 J2 8.25 9 74.25 - - - - 0 0.00 0.45 18 8.1 -

7 JL 14.40 1 14.40 - - - - 0 0.00 - 2 0 -

8 V1 2.50 2 5.00 - - - - 0 0.00 - 0 0 -

181.02 15 19.74 22 10.36


JENDELA MATI (M2) VENTILASI UNGKIT (M2) LOBANG KUSEN (M2)
KACA MATI KACA A A SUB A TOTAL
TOTAL KACA KACA TOTAL
BENING MATI 6mm .
MATI (M2)
.
JALUSI (M2) TOTAL(M . LOBANG
X 6mm (M2) X X
8mm (M2) (M2) 2) KUSEN

- - 0 0 0.24 4 0.96 6.16 1 6.16

- 0.84 2 1.68 0.28 3 0.84 4.20 1 4.2

- - 0 0 0.23 8 1.84 13.60 1 13.6

- - 0 0 0.28 2 0.56 3.92 1 3.92

- - 0 0 - 0 0.00 2.94 1 2.94

- - 0 - 0.26 18 4.68 12.78 1 12.78

- 2.40 1 2.40 0.25 3 0.74 3.14 1 3.135

- - 0 - 0.25 2 0.49 0.49 1 0.49

4.08 38 9.62 47.225


JANGKA WAKTU PELAKSANAAN
PAKET : : PEMBANGUNAN GEDUNG UNIT TRANSFUSI DARAH (UTD)
LOKASI : Kabupaten Jayapura
TAHUN ANGG. : 2018

TAHUN 2018
BOBOT 180 HARI KALENDER
NO NAMA PEKERJAAN KET.
(%) BULAN I BULAN II BULAN III BULAN IV BULAN IV BULAN IV
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15 M16 M13 M14 M15 M16 M13 M14 M15 M16

A PEKERJAAN PENDAHULUAN 0.94 0.94


B PEKERJAAN TANAH DAN PASIR 2.85 0.95 0.95 0.95
C PEKERJAAN STRUKTUR BETON 22.14 4.43 4.43 4.43 4.43 4.43 4.43 4.43
D PEKERJAAN PASANGAN DAN PLESTERAN 15.48 1.94 1.94 1.94 1.94 1.94 1.94 1.94 1.94 1.94 1.94
E PEKERJAAN PENUTUP LANTAI DAN DINDING 5.831 1.46 1.46 1.46 1.46
F PEKERJAAN KUSEN PINTU DAN JENDELA 5.866 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65
G PEKERJAAN PENGUNCI DAN PENGGANTUNG 1.692 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34
H PEKERJAAN KONSTRUKSI ATAP 10.286 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03 1.03
I PEKERJAAN PLAFOND 3.588 0.45 0.45 0.45 0.45 0.45 0.45 0.45 0.45
J PEKERJAAN PENGECATAN 4.506 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
K PEKERJAAN INSTALASI LISTRIK 2.304 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58
L PEKERJAAN SELASAR PENGHUBUNG BANGUNAN 8.563 2.14 2.14 2.14 2.14
M PEKERJAAN TOWER AIR 7.861 1.97 1.97 1.97 1.97
N PEKERJAAN GROUND RESERVOIR 5.746 1.44 1.44 1.44 1.44
O PEKERJAAN SANITASI 0.805 0.20 0.20 0.20 0.20
P PEKERJAAN PLUMBING 1.310 0.65 0.65 0.65 0.65 0.65 0.65
Q PEKERJAAN AKHIR 0.221 0.22 0.22 0.65

JUMLAH BOBOT PEKERJAAN 100.00


RENCANA KERJA MINGGUAN 0.94 0.95 6.41 8.31 7.36 9.95 6.02 4.57 4.57 4.90 4.90 10.77 9.75 7.81 7.48 5.30 4.00 2.07 1.73 5.30 4.00 2.07 1.73 5.74
KUMULATIF RENCANA KERJA MINGGUAN 0.94 1.89 8.30 16.62 23.98 33.93 39.95 44.52 49.08 53.99 58.89 69.66 79.41 87.22 94.70 100.00 104.00 106.07 107.80 113.10 117.11 119.17 120.90 126.64

Sentani, 06 Juni 2018

PT. BUNTU RANNU

IRWANTO TANDI ARANG


Kepala Cabang
LAPORAN REALISASI MINGGU - 1 (KE
PEKERJAAN : Pembuatan Pagar Pengaman Sisi Udara
NILAI KONTRAK : 982,539,000.00
LOKASI : Bandara Di UPBU Kelas I Utama Sentani – Jayapura
TAHUN : 2019
KONTRAKTOR : CV. CAHAYA PURIN
NOMOR KONTRAK : KU.003/10.28.V/UPBU.STN-2019
TANGGAL : 28 Mei 2019
:

Pe
VOLUME BOBOT
NO. URAIAN PEKERJAAN SAT. Minggu L
(Kontrak) (Kontrak)
Volume

A PEKERJAAN PERSIAPAN

1 Pembersihan Lokasi Ls 1.000 0.112 -


2 Pengukuran (Soft Drawing dan Asbuild Drawing) Paket 1.000 0.224 -
JUMLAH A 0.336

B PEMBUATAN PAGAR BARU


1 Galian Tanah M3 56.370 0.623 -
2 Pengadaan Pipa Galvanis M' 864.300 9.773 -
3 Pekerjaan Urugan Pasir M3 15.770 0.759 -
4 Pekerjaan Cor Beton Pondasi dan Sloof M3 52.480 12.266 -
5 Pengadaan Pagar Wiremesh M6 M' 500.000 27.709 -
6 Pekerjaan Pemasangan Besi Siku 60x60x5 M' 1,000.000 4.926 -
7 Pekerjaan Pemasangan Besi 6 mm untuk dudukan Razor Wire M' 1,000.000 0.896 -
8 Pekerjaan Pemasangan Razor Wire M' 1,875.000 19.884 -
9 Pekerjaan Pengecatan Kilat Bronzed M2 936.180 4.412 -
10 Pekerjaan Angkur Besi 10 mm M' 301.500 0.473 -
11 Pengelasan Besi Siku dan Razorwire Titik 906.440 4.023 -
12 Timbunan biasa (penyesuaian level pondasi) M3 407.500 13.123 -
13 Pengadaan dan pemasangan pipa saluran M' 50.000 0.798 -
SUB JUMLAH B 99.664

JUMLAH 100.00

REALISASI YANG DICAPAI MINGGU


RENCANA PEKERJAAN YANG DICA
DEVIASI

: Mengetahui Oleh
PEJABAT PEMBUAT KOMITMAN
(PPK)
Pe
: Mengetahui Oleh VOLUME BOBOT
NO. URAIAN PEKERJAAN SAT. Minggu L
PEJABAT PEMBUAT KOMITMAN (Kontrak) (Kontrak)
Volume
(PPK)

ARYOKO AZIS BELLA


NIP. 19761122 200604 1 002
LISASI MINGGU - 1 (KESATU)

Periode Minggu 1 : (28 Mei S/D 01 Juni 2019)


Minggu Lalu Minggu ini S/D Minggu ini KET.
Bobot Volume Bobot Volume Bobot

- 0.500 0.056 0.500 0.056


- - - - -
- 0.056 0.056

- 14.093 0.156 14.093 0.156


- 129.645 1.466 129.645 1.466
- 1.577 0.076 1.577 0.076
- 5.248 1.227 5.248 1.227
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- 101.875 3.281 101.875 3.281
- - - - -
- 6.205 6.205

- 6.26 6.26

EALISASI YANG DICAPAI MINGGU INI : 6.26 %


ENCANA PEKERJAAN YANG DICAPAI MINGGU INI : 12.50 %
: -6.24 %

: Dibuat Oleh
KONTRAKTOR PELAKSANA
CV. CAHAYA PURIN
Periode Minggu 1 : (28 Mei S/D 01 Juni 2019)
Minggu Lalu : Dibuat
Minggu ini Oleh S/D Minggu ini KET.
Bobot KONTRAKTOR
Volume PELAKSANA
Bobot Volume Bobot
CV. CAHAYA PURIN

DENICK KAFIAR
Direktur
LAPORAN REALISASI BULANAN - I (PE
PEKERJAAN : Pembuatan Pagar Pengaman Sisi Udara
NILAI KONTRAK : 982,539,000.00
LOKASI : SENTANI - KABUPATEN JAYAPURA
TAHUN : 2019
KONTRAKTOR : CV. CAHAYA PURIN
NOMOR KONTRAK : KU.003/10.28.V/UPBU.STN-2019
TANGGAL : 28 Mei 2019

Periode
VOLUME BOBOT
NO. URAIAN PEKERJAAN SAT. Bulan La
(Kontrak) (Kontrak)
Volume

PEKERJAAN PERSIAPAN
A
1 Pembersihan Lokasi Ls 1.000 0.112 -
2 Pengukuran (Soft Drawing dan Asbuild Drawing) Paket 1.000 0.224 -
JUMLAH A 0.336
B PEMBUATAN PAGAR BARU
1 Galian Tanah M3 56.370 0.623 -
2 Pengadaan Pipa Galvanis M' 864.300 9.773 -
3 Pekerjaan Urugan Pasir M3 15.770 0.759 -
4 Pekerjaan Cor Beton Pondasi dan Sloof M3 52.480 12.266 -
5 Pengadaan Pagar Wiremesh M6 M' 500.000 27.709 -
6 Pekerjaan Pemasangan Besi Siku 60x60x5 M' 1,000.000 4.926 -
7 Pekerjaan Pemasangan Besi 6 mm untuk dudukan Razor Wire M' 1,000.000 0.896 -
8 Pekerjaan Pemasangan Razor Wire M' 1,875.000 19.884 -
9 Pekerjaan Pengecatan Kilat Bronzed M2 936.180 4.412 -
10 Pekerjaan Angkur Besi 10 mm M' 301.500 0.473 -
11 Pengelasan Besi Siku dan Razorwire Titik 906.440 4.023 -
12 Timbunan biasa (penyesuaian level pondasi) M3 407.500 13.123 -
13 Pengadaan dan pemasangan pipa saluran M' 50.000 0.798 -
JUMLAH B 99.664

JUMLAH 100.00

REALISASI YANG DICAPAI BULAN I


RENCANA PEKERJAAN YANG DICA
DEVIASI

: Mengetahui Oleh
PEJABAT PEMBUAT KOMITMAN
(PPK)
: Mengetahui Oleh Periode
PEJABAT PEMBUAT KOMITMAN SAT. VOLUME BOBOT
NO. URAIAN PEKERJAAN Bulan La
(Kontrak) (Kontrak)
(PPK) Volume

ARYOKO AZIS BELLA


NIP. 19761122 200604 1 002
ISASI BULANAN - I (PERTAMA)

Periode Bulanan I : (14 Agustus s/d 10 September 2018)


Bulan Lalu Bulan ini S/D Bulan ini KET.
Bobot Volume Bobot Volume Bobot

- 0.500 0.056 0.500 0.056


- - - - -
- 0.056 0.056

- 14.093 0.156 14.093 0.156


- 129.645 1.466 129.645 1.466
- 1.577 0.076 1.577 0.076
- 5.248 1.227 5.248 1.227
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- 101.875 3.281 101.875 3.281
- - - - -
- 6.205 6.205

- 6.26 6.26

EALISASI YANG DICAPAI BULAN INI : 6.26 %


ENCANA PEKERJAAN YANG DICAPAI BULAN INI : 12.50 %
: -6.24 %

: Dibuat Oleh
KONTRAKTOR PELAKSANA
CV. CAHAYA PURIN
Periode Bulanan I : (14 Agustus s/d 10 September 2018)
Bulan Lalu : Dibuat
Bulan ini Oleh S/D Bulan ini KET.
Bobot KONTRAKTOR
Volume PELAKSANA
Bobot Volume Bobot
CV. CAHAYA PURIN

DENICK KAFIAR
Direktur
PROGRES REALISASI PELAKSANAAN PEKERJA
PEKERJAAN : Pembuatan Pagar Pengaman Sisi Udara
NILAI KONTRAK : 982,539,000.00
LOKASI : Bandara Di UPBU Kelas I Utama Sentani – Jayapura
INSTANSI : Err:509
TAHUN : 2019

JANGKA WAKTU PELAKSANAAN 120 H


Periode Bulan I : (28 Mei 2019 s/d 01 J
RENCANA
BOBOT
No. URAIAN PEKERJAAN & BULAN - I (MEI) BULAN - II (JUNI )
KONTRAK
REALISASI 5/28/2019 6/3/2019 6/10/2019 6/17/2019
6/1/2019 6/9/2019 6/16/2019 6/23/2019

PEKERJAAN PERSIAPAN
A. 0.34 Rencana 0.04 0.04 0.04 0.04

Raelisasi Rencana
B. PEMBUATAN PAGAR BARU 99.66 Rencana 12.46 12.46 12.46 12.46
Raelisasi Realisasi

JUMLAH 100.00
Rencana Kerja Mingguan 12.50 12.50 12.50 12.50
Rencana Komulatif Kerja Mingguan - - 12.50 25.00 37.50 50.00
Realisasi Kerja Mingguan -
Realisasi Komulatif Kerja Mingguan - (6.24)
DEVIASI -18.74

: Mengetahui Oleh
PEJABAT PEMBUAT KOMITMAN : Dibuat Oleh
(PPK) KONTRAKTOR PELAKSA
CV. CAHAYA PURIN
: Mengetahui Oleh
PEJABAT PEMBUAT KOMITMAN : Dibuat Oleh
(PPK) KONTRAKTOR PELAKSA
CV. CAHAYA PURIN

ARYOKO AZIS BELLA DENICK KAFIAR


NIP. 19761122 200604 1 002 Direktur
PELAKSANAAN PEKERJAAN

JANGKA WAKTU PELAKSANAAN 120 HARI KALENDER


Periode Bulan I : (28 Mei 2019 s/d 01 Juni 2018)
BULAN - II (JUNI ) BULAN - III (JULI) KET.
6/24/2019 7/1/2019 7/8/2019 7/15/2019
6/30/2019 7/7/2019 7/14/2019 7/21/2019

100
0.04 0.04 0.04 0.04 90
80
70
60
50
40
12.46 12.46 12.46 12.46 30
20
10
0

12.50 12.50 12.50 12.50


62.50 75.00 87.50 100.00

: Dibuat Oleh
KONTRAKTOR PELAKSANA
CV. CAHAYA PURIN
: Dibuat Oleh
KONTRAKTOR PELAKSANA
CV. CAHAYA PURIN

DENICK KAFIAR
Direktur
LAPORAN REALISASI MINGGU - 2 (KE
PEKERJAAN : Pembuatan Pagar Pengaman Sisi Udara
NILAI KONTRAK : 982,539,000.00
LOKASI : Bandara Di UPBU Kelas I Utama Sentani – Jayapura
TAHUN : 2019
KONTRAKTOR : CV. CAHAYA PURIN
NOMOR KONTRAK : KU.003/10.28.V/UPBU.STN-2019
TANGGAL : 28 Mei 2019
:

Pe
VOLUME BOBOT
NO. URAIAN PEKERJAAN SAT. Minggu L
(Kontrak) (Kontrak)
Volume

A PEKERJAAN PERSIAPAN

1 Pembersihan Lokasi Ls 1.000 0.112 0.50


2 Pengukuran (Soft Drawing dan Asbuild Drawing) Paket 1.000 0.224 -
JUMLAH A 0.336

B PEMBUATAN PAGAR BARU


1 Galian Tanah M3 56.370 0.623 14.09
2 Pengadaan Pipa Galvanis M' 864.300 9.773 129.65
3 Pekerjaan Urugan Pasir M3 15.770 0.759 1.58
4 Pekerjaan Cor Beton Pondasi dan Sloof M3 52.480 12.266 5.25
5 Pengadaan Pagar Wiremesh M6 M' 500.000 27.709 -
6 Pekerjaan Pemasangan Besi Siku 60x60x5 M' 1,000.000 4.926 -
7 Pekerjaan Pemasangan Besi 6 mm untuk dudukan Razor Wire M' 1,000.000 0.896 -
8 Pekerjaan Pemasangan Razor Wire M' 1,875.000 19.884 -
9 Pekerjaan Pengecatan Kilat Bronzed M2 936.180 4.412 -
10 Pekerjaan Angkur Besi 10 mm M' 301.500 0.473 -
11 Pengelasan Besi Siku dan Razorwire Titik 906.440 4.023 -
12 Timbunan biasa (penyesuaian level pondasi) M3 407.500 13.123 101.88
13 Pengadaan dan pemasangan pipa saluran M' 50.000 0.798 -
SUB JUMLAH B 99.664

JUMLAH 100.00

REALISASI YANG DICAPAI MINGGU


RENCANA PEKERJAAN YANG DICA
DEVIASI

: Mengetahui Oleh
PEJABAT PEMBUAT KOMITMAN
(PPK)
Pe
: Mengetahui Oleh VOLUME BOBOT
NO. URAIAN PEKERJAAN SAT. Minggu L
PEJABAT PEMBUAT KOMITMAN (Kontrak) (Kontrak)
Volume
(PPK)

ARYOKO AZIS BELLA


NIP. 19761122 200604 1 002
LISASI MINGGU - 2 (KEDUA)

Periode Minggu 2 : (03 Juni S/D 09 Juni 2019)


Minggu Lalu Minggu ini S/D Minggu ini KET.
Bobot Volume Bobot Volume Bobot

0.06 0.500 0.056 1.000 0.112


- 0.500 0.112 0.500 0.112
0.056 0.168 0.224

0.16 42.278 0.467 56.370 0.623


1.47 518.580 5.864 648.225 7.330
0.08 10.251 0.493 11.828 0.569
1.23 23.616 5.520 28.864 6.746
- 125.000 6.927 125.000 6.927
- 250.000 1.232 250.000 1.232
- - - - -
- - - - -
- - - - -
- 226.125 0.354 226.125 0.354
- - - - -
3.28 305.625 9.842 407.500 13.123
- 25.000 0.399 25.000 0.399
6.205 31.098 37.303

6.26 31.27 37.53

EALISASI YANG DICAPAI MINGGU INI : 37.53 %


ENCANA PEKERJAAN YANG DICAPAI MINGGU INI : 12.50 %
: 25.03 %

: Dibuat Oleh
KONTRAKTOR PELAKSANA
CV. CAHAYA PURIN
Periode Minggu 2 : (03 Juni S/D 09 Juni 2019)
Minggu Lalu : Dibuat
Minggu ini Oleh S/D Minggu ini KET.
Bobot KONTRAKTOR
Volume PELAKSANA
Bobot Volume Bobot
CV. CAHAYA PURIN

DENICK KAFIAR
Direktur
LAPORAN REALISASI BULANAN - I (PE
PEKERJAAN : Pembuatan Pagar Pengaman Sisi Udara
NILAI KONTRAK : 982,539,000.00
LOKASI : SENTANI - KABUPATEN JAYAPURA
TAHUN : 2019
KONTRAKTOR : CV. CAHAYA PURIN
NOMOR KONTRAK : KU.003/10.28.V/UPBU.STN-2019
TANGGAL : 28 Mei 2019

Periode
VOLUME BOBOT
NO. URAIAN PEKERJAAN SAT. Bulan La
(Kontrak) (Kontrak)
Volume

PEKERJAAN PERSIAPAN
A
1 Pembersihan Lokasi Ls 1.000 0.112 -
2 Pengukuran (Soft Drawing dan Asbuild Drawing) Paket 1.000 0.224 -
JUMLAH A 0.336
B PEMBUATAN PAGAR BARU
1 Galian Tanah M3 56.370 0.623 -
2 Pengadaan Pipa Galvanis M' 864.300 9.773 -
3 Pekerjaan Urugan Pasir M3 15.770 0.759 -
4 Pekerjaan Cor Beton Pondasi dan Sloof M3 52.480 12.266 -
5 Pengadaan Pagar Wiremesh M6 M' 500.000 27.709 -
6 Pekerjaan Pemasangan Besi Siku 60x60x5 M' 1,000.000 4.926 -
7 Pekerjaan Pemasangan Besi 6 mm untuk dudukan Razor Wire M' 1,000.000 0.896 -
8 Pekerjaan Pemasangan Razor Wire M' 1,875.000 19.884 -
9 Pekerjaan Pengecatan Kilat Bronzed M2 936.180 4.412 -
10 Pekerjaan Angkur Besi 10 mm M' 301.500 0.473 -
11 Pengelasan Besi Siku dan Razorwire Titik 906.440 4.023 -
12 Timbunan biasa (penyesuaian level pondasi) M3 407.500 13.123 -
13 Pengadaan dan pemasangan pipa saluran M' 50.000 0.798 -
JUMLAH B 99.664

JUMLAH 100.00

REALISASI YANG DICAPAI BULAN I


RENCANA PEKERJAAN YANG DICA
DEVIASI

: Mengetahui Oleh
PEJABAT PEMBUAT KOMITMAN
(PPK)
: Mengetahui Oleh Periode
PEJABAT PEMBUAT KOMITMAN SAT. VOLUME BOBOT
NO. URAIAN PEKERJAAN Bulan La
(Kontrak) (Kontrak)
(PPK) Volume

ARYOKO AZIS BELLA


NIP. 19761122 200604 1 002
ISASI BULANAN - I (PERTAMA)

Periode Bulanan I : (14 Agustus s/d 10 September 2018)


Bulan Lalu Bulan ini S/D Bulan ini KET.
Bobot Volume Bobot Volume Bobot

- 0.500 0.056 0.500 0.056


- - - - -
- 0.056 0.056

- 14.093 0.156 14.093 0.156


- 129.645 1.466 129.645 1.466
- 1.577 0.076 1.577 0.076
- 5.248 1.227 5.248 1.227
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- 101.875 3.281 101.875 3.281
- - - - -
- 6.205 6.205

- 6.26 6.26

EALISASI YANG DICAPAI BULAN INI : 6.26 %


ENCANA PEKERJAAN YANG DICAPAI BULAN INI : 12.50 %
: -6.24 %

: Dibuat Oleh
KONTRAKTOR PELAKSANA
CV. CAHAYA PURIN
Periode Bulanan I : (14 Agustus s/d 10 September 2018)
Bulan Lalu : Dibuat
Bulan ini Oleh S/D Bulan ini KET.
Bobot KONTRAKTOR
Volume PELAKSANA
Bobot Volume Bobot
CV. CAHAYA PURIN

DENICK KAFIAR
Direktur
PROGRES REALISASI PELAKSANAAN PEKERJAAN
PEKERJAAN : Pembuatan Pagar Pengaman Sisi Udara
NILAI KONTRAK : 982,539,000.00
LOKASI : Bandara Di UPBU Kelas I Utama Sentani – Jayapura
INSTANSI : Err:509
TAHUN : 2019

JANGKA WAKTU PELAKSANAAN 120 HARI KAL


Periode Bulan I : (28 Mei 2019 s/d 01 Juni 2018)
RENCANA
BOBOT
No. URAIAN PEKERJAAN & BULAN - I (MEI) BULAN - II (JUNI )
KONTRAK
REALISASI 5/28/2019 6/3/2019 6/10/2019 6/17/2019 6/24/2019
6/1/2019 6/9/2019 6/16/2019 6/23/2019 6/30/2019

PEKERJAAN PERSIAPAN
A. 0.34 Rencana 0.04 0.04 0.04 0.04 0.04

Raelisasi Rencana
B. PEMBUATAN PAGAR BARU 99.66 Rencana 12.46 12.46 12.46 12.46 12.46
Raelisasi Realisasi

JUMLAH 100.00
Rencana Kerja Mingguan 12.50 12.50 12.50 12.50 12.50
Rencana Komulatif Kerja Mingguan - - 12.50 25.00 37.50 50.00 62.50
Realisasi Kerja Mingguan -
Realisasi Komulatif Kerja Mingguan - (6.24)
DEVIASI -18.74

: Mengetahui Oleh
PEJABAT PEMBUAT KOMITMAN : Dibuat Oleh
(PPK) KONTRAKTOR PELAKSANA
CV. CAHAYA PURIN
: Mengetahui Oleh
PEJABAT PEMBUAT KOMITMAN : Dibuat Oleh
(PPK) KONTRAKTOR PELAKSANA
CV. CAHAYA PURIN

ARYOKO AZIS BELLA DENICK KAFIAR


NIP. 19761122 200604 1 002 Direktur
PELAKSANAAN PEKERJAAN

JANGKA WAKTU PELAKSANAAN 120 HARI KALENDER


Periode Bulan I : (28 Mei 2019 s/d 01 Juni 2018)
BULAN - III (JULI) KET.
7/1/2019 7/8/2019 7/15/2019
7/7/2019 7/14/2019 7/21/2019

100
0.04 0.04 0.04 90
80
70
60
50
40
12.46 12.46 12.46 30
20
10
0

12.50 12.50 12.50


75.00 87.50 100.00

: Dibuat Oleh
KONTRAKTOR PELAKSANA
CV. CAHAYA PURIN
: Dibuat Oleh
KONTRAKTOR PELAKSANA
CV. CAHAYA PURIN

DENICK KAFIAR
Direktur
BOBOT PEKERJAAN
PEKERJAAN : PEMBANGUNAN GEDUNG UNIT TRANSFUSI DARAH (UTD)
NILAI KONTRAK : Rp. 1.991.419.000,-
LOKASI : SENTANI - KABUPATEN JAYAPURA
INSTANSI : RUMAH SAKIT DAERAH YOWARI
TAHUN : 2018
KONTRAKTOR : PT. BUNTU RANNU
NOMOR KONTRAK : 27/SPMK-UTD/RSUD/VI/2018
TANGGAL : 26 Juni 2018
KONSULTAN PENGAWAS : CV. BINA KARYA GEMILANG

VOLUME BOBOT
NO. URAIAN PEKERJAAN SAT.
(Kontrak) (Kontrak)

I. PEKERJAAN PENDAHULUAN
1 Papan nama proyek Ls 1.000 0.047
2 Pembersihan lokasi pekerjaan M2 200.000 0.147
3 Pembuatan Direksi Keet dan Gudang Bahan M2 36.000 0.749
JUMLAH I 0.943

II. PEKERJAAN TANAH DAN PASIR


1 Pengukuran dan Pasang Bouwplank M1 120.000 0.681
2 Galian tanah biasa u/ pondasi sedalam 1M M3 133.200 0.715
3 Urugan tanah kembali 1/3 galian M3 44.400 0.079
4 Urugan pasir dibawah pondasi M3 4.800 0.096
5 Urugan pasir dibawah lantai tebal 5cm M3 12.665 0.253
6 Urugan tanah peninggian lantai M3 45.594 0.847
7 Pemadatan tanah M3 45.594 0.182
JUMLAH II 2.853

III. PEKERJAAN STRUKTUR BETON


1 Pek. Cor Sloof 15/20, beton K 225 M3 0.420 0.259
2 Pek. Cor Sloof 20/30, beton K 225 M3 10.320 5.509
3 Pek. Cor kolom 12/12, beton K 225 M3 0.492 0.427
4 Pek. Cor Kolom 20/20, beton K 225 M3 5.160 5.155
5 Pek. Cor ring balok 15/20, beton K 225 M3 3.600 2.258
6 Pek. Cor balok kanopi 12/15, beton K 225 M3 1.080 0.903
7 Pek. Cor plat dack kanopi tebal 10cm, beton K 225 M3 6.848 5.506
8 Pek. Cor meja beton tebal 10cm, beton K 225 M3 0.660 0.531
9 Pek. Cor lantai kerja tebal 7cm, beton K 100 M3 12.594 1.131
10 Pek. Cor lantai rabat tebal 10cm, beton K 100 M3 5.137 0.461
SUB JUMLAH III 22.140

IV. PEKERJAAN PASANGAN DAN PLESTERAN


1 Pas. batu kosong (Aanstamping) M3 20.400 0.820
2 Pas. pondasi batu belah 1pc : 4ps M3 48.000 2.340
3 Pasang batu tela, 1 Pc : 2 M2 19.500 0.220
4 Pasang batu tela, 1 Pc : 4 M2 386.475 3.934
5 Plesteran dinding, 1pc : 2ps M2 39.000 0.226
6 Plesteran pelengkungan sudut dinding, 1pc : 2ps M2 14.250 0.083
7 Plesteran dinding, 1pc : 4ps M2 772.950 4.049
8 Plesteran kolom, 1pc : 4ps M2 45.600 0.239
VOLUME BOBOT
NO. URAIAN PEKERJAAN SAT.
(Kontrak) (Kontrak)

9 Plesteran plat dack kanopi, 1pc : 2ps M2 68.477 0.397


10 Acian dinding dan kolom M2 818.550 2.549
11 Acian lantai rabat bangunan M2 85.740 0.267
12 Pemb. saluran rabat bangunan M' 22.500 0.360
JUMLAH IV 15.483

V. PEKERJAAN PENUTUP LANTAI DAN DINDING


1 Pas. Keramik lantai 40/40 (polos) M2 178.370 2.826
2 Pas. Keramik lantai 40/40 (non slipery) M2 47.800 1.059
3 Pas. Keramik lantai KM/WC 20/20 M2 6.000 0.121
4 Pas. Keramik meja beton/WC 20/20 M2 6.600 0.133
5 Pas. Keramik dinding KM/WC 20/25 M2 30.220 0.684
6 Pas. List keramik dinding KM/WC (5/20) M' 25.660 0.079
7 Pas. Pas. plint keramik 10/40 M' 98.300 0.286
8 Pas. Pas. plint keramik P=40cm (Lengkung) M' 42.830 0.152
9 Pas. Keramik kolom selasar 30/30 M2 14.400 0.343
10 Pas. List kuku macan M' 48.000 0.148
JUMLAH V M' 5.831

VI. PEKERJAAN KUSEN PINTU DAN JENDELA


1 Pas. Kusen aluminium M' 181.020 2.627
2 Pas. Pintu Kaca polos 6mm Rangka Alumunium M2 19.740 1.175
3 Pas. Pintu Alumunium M2 2.940 0.235
4 Pas. Jendela Kaca polos 6mm Rangka Alumunium M2 10.360 0.617
5 Pas. Jendela Vent. Kaca polos 6mm Rangka Alumunium M2 9.615 0.572
6 Pas. Jendela kaca mati, kaca polos 6mm M2 4.080 0.160
7 Pas. Jendela ventilasi kaca mati, kaca sand blast 5 mm M2 0.490 0.019
8 Kusen lemari meja beton, kayu besi 5/10 M3 0.142 0.104
9 Daun pintu lemari meja beton, panel kayu kls I M2 6.024 0.357
JUMLAH VI 5.866

VII. PEKERJAAN PENGUNCI DAN PENGGANTUNG


1 Engsel pintu kuningan Psg 30.000 0.119
2 Engsel jendela kuningan Psg 120.000 0.408
3 Pas. Kunci pintu 2 slag Bh 13.000 0.214
4 Pas kunci tanam 1 slag utk WC/KM Bh 2.000 0.029
5 Pas. Kait angin jendela kuningan Bh 60.000 0.171
6 Pas. Grendel pintu kuningan Bh 15.000 0.046
7 Pas. Grendel jendela kuningan Bh 60.000 0.171
8 Pas. Handel jendela Bh 60.000 0.093
9 Pas. Door Closer Bh 13.000 0.440
JUMLAH VII 1.692
VOLUME BOBOT
NO. URAIAN PEKERJAAN SAT.
(Kontrak) (Kontrak)

VIII. PEKERJAAN KONSTRUKSI ATAP


1 Pek. kuda-kuda kayu klas I M3 3.698 2.397
2 Pek. Gording kayu klas II M3 1.804 1.042
3 Pek. Balok skur kayu klas II M3 0.160 0.092
4 Kaso 5/7 & reng 2/3 M2 330.108 2.823
5 Pas. Allumunium foil M2 330.108 0.924
6 Atap genteng metal roof M2 330.108 2.405
7 Pas. Nok genteng metal M' 35.450 0.222
8 Pas. Lisplank papan ky. Besi 2,5/30 M' 70.400 0.379
JUMLAH VIII 10.286

IX. PEKERJAAN PLAFOND


1 Pekerjaan rangka plafond, Besi hollow M2 270.360 1.902
2 Pasang plafond gibsum 9 mm M2 270.360 1.100
3 Pek. List Plafond Gypsum profil sedang M' 215.580 0.586
JUMLAH IX 3.588

X. PEKERJAAN PENGECATAN
1 Cat Dinding tembok dalam (Interior) M2 606.800 1.557
2 Cat Dinding Tembok Luar (Exterior) M2 211.750 1.113
3 Cat plafond M2 270.360 0.694
4 Mendempul dan menggosok kayu M2 35.344 0.048
5 Pekerjaan cat kilat kayu u/kusen dan lisplang M2 23.296 0.155
6 Pekerjaan cat politur u/pintu M2 12.048 0.074
7 Pekerjaan residu kuda-kuda dan gording M3 264.086 0.755
8 Pekerjaan water proofing u/ atap dack M2 54.782 0.112
JUMLAH X 4.506

XI. PEKERJAAN INSTALASI LISTRIK


1 Pas. lampu SL 1x18 W Ttk 17.000 0.291
2 Pas. Lampu downlight 20 Watt Ttk 20.000 0.835
3 Saklar tunggal Ttk 6.000 0.078
4 Saklar ganda Ttk 5.000 0.066
5 Pas. stop kontak biasa H=+30cm Ttk 16.000 0.603
6 Pas. stop kontak + panel AC H=+220cm Ttk 6.000 0.286
7 Pas Outlet Telepon Ttk 1.000 0.047
8 Pas. Outlet TV Ttk 1.000 0.051
9 Sekring Khass 2 group+limit/MCB Set 1.000 0.047
JUMLAH XI 2.304

XII. PEKERJAAN SELASAR PENGHUBUNG BANGUNAN


- Pekerjaan Tanah dan Pasir
1 Pengukuran dan pasang bouwplank M1 22.000 0.125
2 Galian tanah biasa u/ pondasi sedalam 1M M3 24.420 0.131
3 Urugan tanah kembali sedalam 1M = 1/3 galian M3 8.140 0.015
4 Urugan tanah peninggian lantai M3 8.633 0.160
5 Urugan pasir dibawah pondasi & lantai M3 3.758 0.075
- Pekerjaan Pasangan
1 Pas. batu kosong (Aanstamping) M3 3.740 0.150
2 Pas. pondasi batu belah 1pc : 4ps M3 8.800 0.429
VOLUME BOBOT
NO. URAIAN PEKERJAAN SAT.
(Kontrak) (Kontrak)

3 Plesteran kolom dan balok, 1pc : 4ps M2 35.000 0.183


4 Acian kolom dan balok M2 35.000 0.109
5 Pas. Keramik lantai 30/30 M2 33.750 0.702
6 Pas. Keramik kolom selasar 30/30 M2 24.000 0.572
7 Pas. List kuku macan M' 80.000 0.247
8 Acian lantai rabat M2 23.800 0.074
9 Pemb. saluran rabat M' 22.500 0.360
- Pekerjaan Beton
1 Pek. Cor Sloof 20/30, beton K 225 M3 1.320 0.705
2 Pek. Cor Kolom 20/20, beton K 225 M3 1.650 1.648
3 Pek. Cor ring balok 15/20, beton K 225 M3 0.660 0.414
4 Pek. Cor lantai kerja tebal 7cm, beton K 100 M3 4.029 0.362
- Pekerjaan Konstruksi Atap
1 Pek. kuda-kuda kayu klas I M3 0.356 0.231
2 Pek. Gording kayu klas II M3 0.456 0.263
3 Pas. Atap spandek (Galvanis) M2 66.453 0.930
4 Pas. Bubungan atap spandek M' 14.400 0.138
5 Pek. Jurai dalam seng BJLS 30mm M' 3.000 0.032
6 Pas. Lisplank papan ky. Besi 2,5/30 M' 22.500 0.121
- Pekerjaan Pengecatan
1 Cat kolom dan balok M2 19.000 0.049
2 Pek. cat kilat kayu u/gording, kuda-kuda dan lisplang M2 50.781 0.338
JUMLAH XII 8.563

XIII. PEKERJAAN TOWER AIR


- Pekerjaan Tanah dan Pasir
1 Pengukuran dan pasang bouwplank M1 17.750 0.101
2 Galian tanah biasa u/ pondasi sedalam 1M M3 27.027 0.145
3 Urugan tanah kembali sedalam 1M = 1/3 galian M3 9.009 0.016
4 Urugan tanah peninggian lantai M3 2.780 0.052
5 Pemadatan tanah urugan peninggian lantai M3 2.780 0.011
6 Urugan pasir dibawah pondasi & lantai M3 1.468 0.029
- Pekerjaan Pasangan
1 Pek. Cerucuk 10/10, kayu besi M3 2.160 1.199
2 Pas. pondasi batu belah 1pc : 4ps M3 2.800 0.136
3 Pekerjaan acian lantai M2 27.500 0.086
4 Pek. lantai papan kayu klas I M2 7.000 0.195
VOLUME BOBOT
NO. URAIAN PEKERJAAN SAT.
(Kontrak) (Kontrak)

- Pekerjaan Beton
1 Pek. Cor Pondasi Poer Plat 120x120, beton K 225 M3 3.096 1.342
2 Pek. Cor Kolom Pendek 35/35, beton K 225 M3 1.176 0.849
3 Pek. Cor Sloof 25/30, beton K 225 M3 1.331 0.711
4 Pek. Cor lantai kerja tebal 7cm, beton K 100 M3 1.925 0.173
- Pekerjaan Konstruksi Besi
1 Pek. Besi siku L 40. 40. 2,5 M' 10.860 0.131
2 Pek. Besi siku L 50. 50. 3 M' 17.700 0.278
3 Pek. Besi siku L 75. 75. 5 M' 76.800 1.330
4 Pek. Besi siku L 100. 100. 5 M' 36.000 0.700
5 Pas. Angker, Baut+Mur & Plat Buhul Baja +Acc Ls 1.000 0.138
6 Pek. cat kilat besi M2 42.718 0.241
JUMLAH XIII 7.861

XIV. PEKERJAAN GROUND RESERVOIR


- Pekerjaan Tanah dan Pasir
1 Pengukuran dan pasang bouwplank M1 10.000 0.057
2 Galian tanah biasa u/ pondasi sedalam 1M M3 12.790 0.069
3 Urugan tanah kembali sedalam 1M = 1/3 galian M3 4.263 0.008
4 Urugan tanah peninggian lantai M3 0.500 0.009
5 Pemadatan tanah urugan peninggian lantai M3 0.500 0.002
6 Urugan pasir dibawah pondasi & lantai M3 0.750 0.015
- Pekerjaan Pasangan
1 Pas. batu kosong (Aanstamping) M3 1.000 0.040
2 Pas. pondasi batu belah 1pc : 4ps M3 1.870 0.091
3 Pasang 1 batu tela, 1 Pc : 4 M2 18.000 0.392
4 Plesteran dinding, 1pc : 2ps M2 42.000 0.473
5 Plesteran penutup beton, 1pc : 2ps M2 7.000 0.079
6 Pekerjaan acian penutup beton M2 7.000 0.022
7 Pas. Keramik lantai dan dinding, 20/20 M2 90.000 1.809
- Pekerjaan Beton
1 Pek. Cor Sloof 20/30, beton K 225 M3 0.600 0.320
2 Pek. Cor kolom 20/20, beton K 225 M3 0.432 0.432
3 Pek. Cor ring balok 20/20 beton K 225 M3 0.400 0.231
4 Pek. Cor plat dack tebal 10 cm beton K 225 M3 0.700 0.563
5 Pek. Cor lantai kerja tebal 7cm, beton K 100 M3 0.600 0.054
- Aksesories Penunjang
1 Besi plat penutup lobang kontrol M2 0.360 0.021
2 Profil tank kapasitas 2200 Liter + ACC Bh 2.000 0.877
3 Pompa air Bh 1.000 0.182
JUMLAH XIV 5.746

XV. PEKERJAAN SANITASI


1 Kran air stainlees Bh 2.000 0.008
2 Kran air stainlees leher angsa Bh 3.000 0.053
3 Floor drain stainless Bh 2.000 0.007
4 Kloset duduk +Assesories Bh 2.000 0.519
5 Kitchen zinc lengkap terpasang Bh 3.000 0.219
JUMLAH XV 0.805
VOLUME BOBOT
NO. URAIAN PEKERJAAN SAT.
(Kontrak) (Kontrak)

XVI. PEKERJAAN PLUMBING


1 Pipa GIP medium Ø 1/2" untuk instalasi air bersih M' 40.000 0.162
2 Pipa GIP medium Ø 3/4" untuk instalasi air bersih M' 20.000 0.083
3 Pas. Pipa PVC Ø 2" untuk instalasi air kotor M' 31.000 0.139
4 Pas. Pipa PVC Ø 4" untuk instalasi air kotor M' 22.000 0.300
5 Septic tank dan peresapan Unit 1.000 0.626
JUMLAH XV 1.310

XVII. PEKERJAAN AKHIR


1 Pek. Pembersihan/perapihan bangunan + halaman Ls 1.000 0.083
2 Pembuatan pelaporan + dokumentasi Pekerjaan Ls 1.000 0.138
JUMLAH XIII 0.221

JUMLAH 100.00

REALISASI YANG DICAPAI MINGG


RENCANA PEKERJAAN YANG DICA
DEVIASI

: Mengetahui Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN
(PPTK)

Drg. MARYEN BRAWERY, M.Kes


NIP. 19740117 200112 2 003
PEKERJAAN

Periode Minggu 13 : (18 September s/d 24 September 2018)


Minggu Lalu Minggu ini S/D Minggu ini KET.
Volume Bobot Volume Bobot Volume Bobot

#REF! #REF! - - #REF! #REF!


#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! - #REF!

#REF! #REF! - - #REF! #REF!


#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! - #REF!

#REF! #REF! - - #REF! #REF!


#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! 3.150 2.533 #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! 2.533 #REF!

#REF! #REF! - - #REF! #REF!


#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! 19.324 0.197 #REF! #REF!
#REF! #REF! 12.480 0.072 #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! 278.262 1.458 #REF! #REF!
#REF! #REF! - - #REF! #REF!
Periode Minggu 13 : (18 September s/d 24 September 2018)
Minggu Lalu Minggu ini S/D Minggu ini KET.
Volume Bobot Volume Bobot Volume Bobot
#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! 1.727 #REF!

#REF! #REF! - - #REF! #REF!


#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! - #REF!

#REF! #REF! - - #REF! #REF!


#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! - #REF!

#REF! #REF! - - #REF! #REF!


#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! - #REF!
Periode Minggu 13 : (18 September s/d 24 September 2018)
Minggu Lalu Minggu ini S/D Minggu ini KET.
Volume Bobot Volume Bobot Volume Bobot

#REF! #REF! - - #REF! #REF!


#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! 33.011 0.092 #REF! #REF!
#REF! #REF! 49.516 0.361 #REF! #REF!
#REF! #REF! 31.905 0.200 #REF! #REF!
#REF! #REF! 14.080 0.076 #REF! #REF!
#REF! 0.729 #REF!

#REF! #REF! - - #REF! #REF!


#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! - #REF!

#REF! #REF! - - #REF! #REF!


#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! - #REF!

#REF! #REF! 0.510 0.009 #REF! #REF!


#REF! #REF! 0.600 0.025 #REF! #REF!
#REF! #REF! 0.180 0.002 #REF! #REF!
#REF! #REF! 0.150 0.002 #REF! #REF!
#REF! #REF! 0.480 0.018 #REF! #REF!
#REF! #REF! 0.180 0.009 #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! #REF! - - #REF! #REF!
#REF! 0.065 #REF!

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -
Periode Minggu 13 : (18 September s/d 24 September 2018)
Minggu Lalu Minggu ini S/D Minggu ini KET.
Volume Bobot Volume Bobot Volume Bobot
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -
- - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -
Periode Minggu 13 : (18 September s/d 24 September 2018)
Minggu Lalu Minggu ini S/D Minggu ini KET.
Volume Bobot Volume Bobot Volume Bobot

- - - - - -
- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -

- - - - - -
- - - - - -
- - - - - -
- - -

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - -
Periode Minggu 13 : (18 September s/d 24 September 2018)
Minggu Lalu Minggu ini S/D Minggu ini KET.
Volume Bobot Volume Bobot Volume Bobot

- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - - - - -
- - -

- - - - - -
- - - - - -
- - -

#REF! 5.05 #REF!

SI YANG DICAPAI MINGGU INI : #REF! %


A PEKERJAAN YANG DICAPAI MINGGU INI : #REF! %
: #REF! %

: Di Buat Oleh
KONTRAKTOR PELAKSANA
PT. BUNTU RANNU

IRWANTO TANDI ARANG


Kepala Cabang
RENCANA ANGGARAN BIAYA (RAB)
#REF! : PEMBANGUNAN GEDUNG UNIT TRANSFUSI DARAH (UTD)
#REF! #REF!
#REF! #REF!
#REF! #REF!

NO. URAIAN PEKERJAAN SATUAN VOLUME

1 2 3 4

I. PEKERJAAN PENDAHULUAN
1 Papan nama proyek Ls 1.000
2 Pembersihan lokasi pekerjaan M2 200.000
3 Pembuatan Direksi Keet dan Gudang Bahan M2 36.000
Sub Total I
II. PEKERJAAN TANAH DAN PASIR
1 Pengukuran dan Pasang Bouwplank M1 120.000
2 Galian tanah biasa u/ pondasi sedalam 1M M3 133.200
3 Urugan tanah kembali 1/3 galian M3 44.400
4 Urugan pasir dibawah pondasi M3 4.800
5 Urugan pasir dibawah lantai tebal 5cm M3 12.665
6 Urugan tanah peninggian lantai M3 45.594
7 Pemadatan tanah M3 45.594
Sub Total II
III. PEKERJAAN STRUKTUR BETON
1 Pek. Cor Sloof 15/20, beton K 225 M3 0.420
2 Pek. Cor Sloof 20/30, beton K 225 M3 10.320
3 Pek. Cor kolom 12/12, beton K 225 M3 0.492
4 Pek. Cor Kolom 20/20, beton K 225 M3 5.160
5 Pek. Cor ring balok 15/20, beton K 225 M3 3.600
6 Pek. Cor balok kanopi 12/15, beton K 225 M3 1.080
7 Pek. Cor plat dack kanopi tebal 10cm, beton K 225 M3 6.848
8 Pek. Cor meja beton tebal 10cm, beton K 225 M3 0.660
9 Pek. Cor lantai kerja tebal 7cm, beton K 100 M3 12.594
10 Pek. Cor lantai rabat tebal 10cm, beton K 100 M3 5.137
Sub Total III
IV. PEKERJAAN PASANGAN DAN PLESTERAN
1 Pas. batu kosong (Aanstamping) M3 20.400
2 Pas. pondasi batu belah 1pc : 4ps M3 48.000
3 Pasang batu tela, 1 Pc : 2 M2 19.500
4 Pasang batu tela, 1 Pc : 4 M2 386.475
5 Plesteran dinding, 1pc : 2ps M2 39.000
6 Plesteran pelengkungan sudut dinding, 1pc : 2ps M2 14.250
7 Plesteran dinding, 1pc : 4ps M2 772.950
8 Plesteran kolom, 1pc : 4ps M2 45.600
9 Plesteran plat dack kanopi, 1pc : 2ps M2 68.477
10 Acian dinding dan kolom M2 818.550
11 Acian lantai rabat bangunan M2 85.740
12 Pemb. saluran rabat bangunan M' 22.500
Sub Total IV
V. PEKERJAAN PENUTUP LANTAI DAN DINDING
1 Pas. Keramik lantai 40/40 (polos) M2 178.370
2 Pas. Keramik lantai 40/40 (non slipery) M2 47.800
3 Pas. Keramik lantai KM/WC 20/20 M2 6.000
4 Pas. Keramik meja beton/WC 20/20 M2 6.600
5 Pas. Keramik dinding KM/WC 20/25 M2 30.220
6 Pas. List keramik dinding KM/WC (5/20) M' 25.660
7 Pas. Pas. plint keramik 10/40 M' 98.300
8 Pas. Pas. plint keramik P=40cm (Lengkung) M' 42.830
9 Pas. Keramik kolom selasar 30/30 M2 14.400
10 Pas. List kuku macan M' 48.000
Sub Total V
NO. URAIAN PEKERJAAN SATUAN VOLUME

1 2 3 4
VI. PEKERJAAN KUSEN PINTU DAN JENDELA
1 Pas. Kusen aluminium M' 181.020
2 Pas. Pintu Kaca polos 6mm Rangka Alumunium M2 19.740
3 Pas. Pintu Alumunium M2 2.940
4 Pas. Jendela Kaca polos 6mm Rangka Alumunium M2 10.360
5 Pas. Jendela Vent. Kaca polos 6mm Rangka Alumunium M2 9.615
6 Pas. Jendela kaca mati, kaca polos 6mm M2 4.080
7 Pas. Jendela ventilasi kaca mati, kaca sand blast 5 M2 0.490
8 Kusen lemari meja beton, kayu besi 5/10 M3 0.142
9 Daun pintu lemari meja beton, panel kayu kls I M2 6.024
Sub Total VI

VII. PEKERJAAN PENGUNCI DAN PENGGANTUNG


1 Engsel pintu kuningan Psg 30.000
2 Engsel jendela kuningan Psg 120.000
3 Pas. Kunci pintu 2 slag Bh 13.000
4 Pas kunci tanam 1 slag utk WC/KM Bh 2.000
5 Pas. Kait angin jendela kuningan Bh 60.000
6 Pas. Grendel pintu kuningan Bh 15.000
7 Pas. Grendel jendela kuningan Bh 60.000
8 Pas. Handel jendela Bh 60.000
9 Pas. Door Closer Bh 13.000
Sub Total VII
VIII. PEKERJAAN KONSTRUKSI ATAP
1 Pek. kuda-kuda kayu klas I M3 3.698
2 Pek. Gording kayu klas II M3 1.804
3 Pek. Balok skur kayu klas II M3 0.160
4 Kaso 5/7 & reng 2/3 M2 330.108
5 Pas. Allumunium foil M2 330.108
6 Atap genteng metal roof M2 330.108
7 Pas. Nok genteng metal M' 35.450
8 Pas. Lisplank papan ky. Besi 2,5/30 M' 70.400
Sub Total VIII
IX. PEKERJAAN PLAFOND
1 Pekerjaan rangka plafond, Besi hollow M2 270.360
2 Pasang plafond gibsum 9 mm M2 270.360
3 Pek. List Plafond Gypsum profil sedang M' 215.580
Sub Total IX
X. PEKERJAAN PENGECATAN
1 Cat Dinding tembok dalam (Interior) M2 606.800
2 Cat Dinding Tembok Luar (Exterior) M2 211.750
3 Cat plafond M2 270.360
4 Mendempul dan menggosok kayu M2 35.344
5 Pekerjaan cat kilat kayu u/kusen dan lisplang M2 23.296
6 Pekerjaan cat politur u/pintu M2 12.048
7 Pekerjaan residu kuda-kuda dan gording M3 264.086
8 Pekerjaan water proofing u/ atap dack M2 54.782
Sub Total X
XI. PEKERJAAN INSTALASI LISTRIK
1 Pas. lampu SL 1x18 W Ttk 17.000
2 Pas. Lampu downlight 20 Watt Ttk 20.000
3 Saklar tunggal Ttk 6.000
4 Saklar ganda Ttk 5.000
5 Pas. stop kontak biasa H=+30cm Ttk 16.000
6 Pas. stop kontak + panel AC H=+220cm Ttk 6.000
7 Pas Outlet Telepon Ttk 1.000
8 Pas. Outlet TV Ttk 1.000
9 Sekring Khass 2 group+limit/MCB Set 1.000
Sub Total XI
NO. URAIAN PEKERJAAN SATUAN VOLUME

1 2 3 4
XII. PEKERJAAN SELASAR PENGHUBUNG BANGUNAN
- Pekerjaan Tanah dan Pasir
1 Pengukuran dan pasang bouwplank M1 22.000
2 Galian tanah biasa u/ pondasi sedalam 1M M3 24.420
3 Urugan tanah kembali sedalam 1M = 1/3 galian M3 8.140
4 Urugan tanah peninggian lantai M3 8.633
5 Urugan pasir dibawah pondasi & lantai M3 3.758
- Pekerjaan Pasangan
1 Pas. batu kosong (Aanstamping) M3 3.740
2 Pas. pondasi batu belah 1pc : 4ps M3 8.800
3 Plesteran kolom dan balok, 1pc : 4ps M2 35.000
4 Acian kolom dan balok M2 35.000
5 Pas. Keramik lantai 30/30 M2 33.750
6 Pas. Keramik kolom selasar 30/30 M2 24.000
7 Pas. List kuku macan M' 80.000
8 Acian lantai rabat M2 23.800
9 Pemb. saluran rabat M' 22.500
- Pekerjaan Beton
1 Pek. Cor Sloof 20/30, beton K 225 M3 1.320
2 Pek. Cor Kolom 20/20, beton K 225 M3 1.650
3 Pek. Cor ring balok 15/20, beton K 225 M3 0.660
4 Pek. Cor lantai kerja tebal 7cm, beton K 100 M3 4.029
- Pekerjaan Konstruksi Atap
1 Pek. kuda-kuda kayu klas I M3 0.356
2 Pek. Gording kayu klas II M3 0.456
3 Pas. Atap spandek (Galvanis) M2 66.453
4 Pas. Bubungan atap spandek M' 14.400
5 Pek. Jurai dalam seng BJLS 30mm M' 3.000
6 Pas. Lisplank papan ky. Besi 2,5/30 M' 22.500
- Pekerjaan Pengecatan
1 Cat kolom dan balok M2 19.000
2 Pek. cat kilat kayu u/gording, kuda-kuda dan lispla M2 50.781
Sub Total XII
XIII. PEKERJAAN TOWER AIR
- Pekerjaan Tanah dan Pasir
1 Pengukuran dan pasang bouwplank M1 17.750
2 Galian tanah biasa u/ pondasi sedalam 1M M3 27.027
3 Urugan tanah kembali sedalam 1M = 1/3 galian M3 9.009
4 Urugan tanah peninggian lantai M3 2.780
5 Pemadatan tanah urugan peninggian lantai M3 2.780
6 Urugan pasir dibawah pondasi & lantai M3 1.468
- Pekerjaan Pasangan
1 Pek. Cerucuk 10/10, kayu besi M3 2.160
2 Pas. pondasi batu belah 1pc : 4ps M3 2.800
3 Pekerjaan acian lantai M2 27.500
4 Pek. lantai papan kayu klas I M2 7.000
- Pekerjaan Beton
1 Pek. Cor Pondasi Poer Plat 120x120, beton K 225 M3 3.096
2 Pek. Cor Kolom Pendek 35/35, beton K 225 M3 1.176
3 Pek. Cor Sloof 25/30, beton K 225 M3 1.331
4 Pek. Cor lantai kerja tebal 7cm, beton K 100 M3 1.925
- Pekerjaan Konstruksi Besi
1 Pek. Besi siku L 40. 40. 2,5 M' 10.860
2 Pek. Besi siku L 50. 50. 3 M' 17.700
3 Pek. Besi siku L 75. 75. 5 M' 76.800
4 Pek. Besi siku L 100. 100. 5 M' 36.000
5 Pas. Angker, Baut+Mur & Plat Buhul Baja +Acc Ls 1.000
6 Pek. cat kilat besi M2 42.718
Sub Total XIII
NO. URAIAN PEKERJAAN SATUAN VOLUME

1 2 3 4
XIV. PEKERJAAN GROUND RESERVOIR
- Pekerjaan Tanah dan Pasir
1 Pengukuran dan pasang bouwplank M1 10.000
2 Galian tanah biasa u/ pondasi sedalam 1M M3 12.790
3 Urugan tanah kembali sedalam 1M = 1/3 galian M3 4.263
4 Urugan tanah peninggian lantai M3 0.500
5 Pemadatan tanah urugan peninggian lantai M3 0.500
6 Urugan pasir dibawah pondasi & lantai M3 0.750
- Pekerjaan Pasangan
1 Pas. batu kosong (Aanstamping) M3 1.000
2 Pas. pondasi batu belah 1pc : 4ps M3 1.870
3 Pasang 1 batu tela, 1 Pc : 4 M2 18.000
4 Plesteran dinding, 1pc : 2ps M2 42.000
5 Plesteran penutup beton, 1pc : 2ps M2 7.000
6 Pekerjaan acian penutup beton M2 7.000
7 Pas. Keramik lantai dan dinding, 20/20 M2 90.000
- Pekerjaan Beton
1 Pek. Cor Sloof 20/30, beton K 225 M3 0.600
2 Pek. Cor kolom 20/20, beton K 225 M3 0.432
3 Pek. Cor ring balok 20/20 beton K 225 M3 0.400
4 Pek. Cor plat dack tebal 10 cm beton K 225 M3 0.700
5 Pek. Cor lantai kerja tebal 7cm, beton K 100 M3 0.600
- Aksesories Penunjang
1 Besi plat penutup lobang kontrol M2 0.360
2 Profil tank kapasitas 2200 Liter + ACC Bh 2.000
3 Pompa air Bh 1.000
Sub Total XIV
XV. PEKERJAAN SANITASI
1 Kran air stainlees Bh 2.000
2 Kran air stainlees leher angsa Bh 3.000
3 Floor drain stainless Bh 2.000
4 Kloset duduk +Assesories Bh 2.000
5 Kitchen zinc lengkap terpasang Bh 3.000
Sub Total XV
XVI. PEKERJAAN PLUMBING
1 Pipa GIP medium Ø 1/2" untuk instalasi air bersih M' 40.000
2 Pipa GIP medium Ø 3/4" untuk instalasi air bersih M' 20.000
3 Pas. Pipa PVC Ø 2" untuk instalasi air kotor M' 31.000
4 Pas. Pipa PVC Ø 4" untuk instalasi air kotor M' 22.000
5 Septic tank dan peresapan Unit 1.000
Sub Total XVI
XVII. PEKERJAAN AKHIR
1 Pek. Pembersihan/perapihan bangunan + halaman Ls 1.000
2 Pembuatan pelaporan + dokumentasi Pekerjaan Ls 1.000
Sub Total XVII
REKAPITULASI ANGGARAN BIAYA
#REF! : PEMBANGUNAN GEDUNG UNIT TRANSFUSI DARAH (UTD)
#REF! #REF!
#REF! #REF!
#REF! #REF!

NO. URAIAN PEKERJAAN

1 2

I. PEKERJAAN PENDAHULUAN

II. PEKERJAAN TANAH DAN PASIR

III. PEKERJAAN STRUKTUR BETON

IV. PEKERJAAN PASANGAN DAN PLESTERAN

V. PEKERJAAN PENUTUP LANTAI DAN DINDING

VI. PEKERJAAN KUSEN PINTU DAN JENDELA

VII. PEKERJAAN PENGUNCI DAN PENGGANTUNG

VIII. PEKERJAAN KONSTRUKSI ATAP

IX. PEKERJAAN PLAFOND

X. PEKERJAAN PENGECATAN

XI. PEKERJAAN INSTALASI LISTRIK

XII. PEKERJAAN SELASAR PENGHUBUNG BANGUNAN

XIII. PEKERJAAN TOWER AIR

XIV. PEKERJAAN GROUND RESERVOIR

XV. PEKERJAAN SANITASI

XVI. PEKERJAAN PLUMBING

XVII. PEKERJAAN AKHIR

REAL COST PEKERJAAN FISIK

PPN 10 %

TOTAL BIAYA FISIK ( REAL COST + PPn 10% )


DIBULATKAN

TERBILANG : Satu Milyar Sembilan Ratus Sembilan Puluh Satu Juta Empat R
Rupiah
BIAYA (RAB)

HARGA SATUAN TOTAL HARGA


(Rp.) (Rp.)
5 6 = 4 x 5

850,000.00 850,000.00
13,340.00 2,668,000.00
376,625.35 13,558,512.76
Sub Total I 17,076,512.76

102,709.00 12,325,080.00
97,200.00 12,947,040.00
32,400.00 1,438,560.00
361,320.00 1,734,336.00
361,320.00 4,576,117.80
336,200.00 15,328,702.80
72,400.00 3,301,005.60
Sub Total II 51,650,842.20

11,161,363.85 4,687,772.82
9,664,856.31 99,741,317.17
15,699,570.64 7,731,724.55
18,086,868.59 93,328,241.95
11,354,289.21 40,875,441.17
15,132,436.84 16,343,031.79
14,557,326.52 99,684,204.78
14,557,326.52 9,607,835.50
1,625,508.80 20,472,308.05
1,625,508.80 8,349,588.51
Sub Total III 400,821,466.28

727,910.40 14,849,372.16
882,526.00 42,361,248.00
203,790.60 3,973,916.70
184,274.10 71,217,332.80
104,921.20 4,091,926.80
104,921.20 1,495,127.10
94,840.80 73,307,196.36
94,840.80 4,324,740.48
104,921.20 7,184,689.01
56,380.00 46,149,849.00
56,380.00 4,834,021.20
289,367.65 6,510,772.13
Sub Total IV 280,300,191.73

286,877.50 51,170,339.68
401,245.00 19,179,511.00
363,857.50 2,183,145.00
363,857.50 2,401,459.50
409,532.60 12,376,075.17
55,868.10 1,433,575.45
52,748.10 5,185,138.23
64,143.10 2,747,248.97
431,134.43 6,208,335.84
55,868.10 2,681,668.80
Sub Total V 105,566,497.64
HARGA SATUAN TOTAL HARGA
(Rp.) (Rp.)
5 6 = 4 x 5

262,770.80 47,566,770.22
1,077,446.00 21,268,784.04
1,445,777.60 4,250,586.14
1,077,446.00 11,162,340.56
1,077,446.00 10,359,643.29
711,884.00 2,904,486.72
693,074.00 339,606.26
13,262,050.00 1,888,515.92
1,072,830.00 6,462,727.92
Sub Total VI 106,203,461.07

71,850.00 2,155,500.00
61,540.00 7,384,800.00
298,200.00 3,876,600.00
261,000.00 522,000.00
51,700.00 3,102,000.00
55,200.00 828,000.00
51,700.00 3,102,000.00
28,200.00 1,692,000.00
612,700.00 7,965,100.00
Sub Total VII 30,628,000.00

11,735,000.00 43,398,377.00
10,462,560.00 18,870,273.22
10,462,560.00 1,674,009.60
154,846.00 51,115,903.37
50,689.00 16,732,844.41
131,916.00 43,546,526.93
113,472.00 4,022,582.40
97,470.00 6,861,888.00
Sub Total VIII 186,222,404.92

127,373.00 34,436,564.28
73,663.80 19,915,744.97
49,216.50 10,610,093.07
Sub Total IX 64,962,402.32

46,439.00 28,179,185.20
95,129.00 20,143,565.75
46,439.00 12,555,248.04
24,402.00 862,464.29
120,498.00 2,807,121.41
111,462.00 1,342,894.18
51,730.00 13,661,189.47
37,088.00 2,031,739.98
Sub Total X 81,583,408.31

309,746.67 5,265,693.33
756,081.67 15,121,633.33
234,446.67 1,406,680.00
240,746.67 1,203,733.33
681,811.67 10,908,986.67
861,446.67 5,168,680.00
857,171.67 857,171.67
921,171.67 921,171.67
851,801.67 851,801.67
Sub Total XI 41,705,551.67
HARGA SATUAN TOTAL HARGA
(Rp.) (Rp.)
5 6 = 4 x 5

102,709.00 2,259,598.00
97,200.00 2,373,624.00
32,400.00 263,736.00
336,200.00 2,902,246.50
361,320.00 1,357,659.90

727,910.40 2,722,384.90
882,526.00 7,766,228.80
94,840.80 3,319,428.00
56,380.00 1,973,300.00
376,608.08 12,710,522.81
431,134.43 10,347,226.40
55,868.10 4,469,448.00
56,380.00 1,341,844.00
289,367.65 6,510,772.13

9,664,856.31 12,757,610.34
18,086,868.59 29,843,333.18
11,354,289.21 7,493,830.88
1,625,508.80 6,548,362.21

11,735,000.00 4,182,354.00
10,462,560.00 4,766,742.34
253,428.00 16,841,055.01
174,080.00 2,506,752.00
191,904.00 575,712.00
97,470.00 2,193,075.00

46,439.00 882,341.00
120,498.00 6,119,008.94
Sub Total XII 155,028,196.32

102,709.00 1,823,084.75
97,200.00 2,627,024.40
32,400.00 291,891.60
336,200.00 934,467.90
72,400.00 201,235.80
361,320.00 530,237.10

10,047,240.00 21,702,038.40
882,526.00 2,471,072.80
56,380.00 1,550,450.00
503,814.00 3,526,698.00

7,847,869.95 24,297,005.35
13,065,522.02 15,365,053.89
9,664,856.31 12,866,339.97
1,625,508.80 3,129,104.44

217,608.00 2,363,222.88
283,848.00 5,024,109.60
313,568.00 24,082,022.40
351,968.00 12,670,848.00
2,500,000.00 2,500,000.00
102,233.00 4,367,148.40
Sub Total XIII 142,323,055.69
HARGA SATUAN TOTAL HARGA
(Rp.) (Rp.)
5 6 = 4 x 5

102,709.00 1,027,090.00
97,200.00 1,243,188.00
32,400.00 138,132.00
336,200.00 168,100.00
72,400.00 36,200.00
361,320.00 270,990.00

727,910.40 727,910.40
882,526.00 1,650,323.62
394,469.10 7,100,443.80
203,790.60 8,559,205.20
203,790.60 1,426,534.20
56,380.00 394,660.00
363,857.50 32,747,175.00

9,664,856.31 5,798,913.79
18,086,868.59 7,813,527.23
10,469,418.59 4,187,767.44
14,557,326.52 10,190,128.56
1,625,508.80 975,305.28

1,074,749.11 386,909.68
7,937,500.00 15,875,000.00
3,302,000.00 3,302,000.00
Sub Total XIV 104,019,504.20

72,242.50 144,485.00
317,500.00 952,500.00
61,200.00 122,400.00
4,695,186.00 9,390,372.00
1,323,255.00 3,969,765.00
Sub Total XV 14,579,522.00

73,117.50 2,924,700.00
75,372.00 1,507,440.00
81,156.10 2,515,839.10
246,640.55 5,426,092.10
11,336,394.95 11,336,394.95
Sub Total XVI 23,710,466.15

1,500,000.00 1,500,000.00
2,500,000.00 2,500,000.00
Sub Total XVII 4,000,000.00
ARAN BIAYA

TOTAL HARGA
(Rp.)

17,076,512.76

51,650,842.20

400,821,466.28

280,300,191.73

105,566,497.64

106,203,461.07

30,628,000.00

186,222,404.92

64,962,402.32

81,583,408.31

41,705,551.67

155,028,196.32

142,323,055.69

104,019,504.20

14,579,522.00

23,710,466.15

4,000,000.00

1,810,381,483.27

181,038,148.33

1,991,419,631.60
1,991,419,000.00

Puluh Satu Juta Empat Ratus Sembilan Belas Ribu


Rupiah

Sentani, 06 Juni 2018

PT. BUNTU RANNU

IRWANTO TANDI ARANG


Kepala Cabang
BOBOT PEKERJAAN
PEKERJAAN : PEMBANGUNAN GEDUNG UNIT TRANSFUSI DARAH (UTD)
NILAI KONTRAK : Rp. 1.991.419.000,-
LOKASI : SENTANI - KABUPATEN JAYAPURA
INSTANSI : RUMAH SAKIT DAERAH YOWARI
TAHUN : 2018
KONTRAKTOR : PT. BUNTU RANNU
NOMOR KONTRAK : 27/SPMK-UTD/RSUD/VI/2018
TANGGAL : 26 Juni 2018
KONSULTAN PENGAWAS : CV. BINA KARYA GEMILANG

VOLUME
NO. URAIAN PEKERJAAN SAT.
(Kontrak)

I. PEKERJAAN PENDAHULUAN
1 Papan nama proyek Ls 1.000
2 Pembersihan lokasi pekerjaan M2 200.000
3 Pembuatan Direksi Keet dan Gudang Bahan M2 36.000
JUMLAH I

II. PEKERJAAN TANAH DAN PASIR


1 Pengukuran dan Pasang Bouwplank M1 120.000
2 Galian tanah biasa u/ pondasi sedalam 1M M3 133.200
3 Urugan tanah kembali 1/3 galian M3 44.400
4 Urugan pasir dibawah pondasi M3 4.800
5 Urugan pasir dibawah lantai tebal 5cm M3 12.665
6 Urugan tanah peninggian lantai M3 45.594
7 Pemadatan tanah M3 45.594
JUMLAH II

III. PEKERJAAN STRUKTUR BETON


1 Pek. Cor Sloof 15/20, beton K 225 M3 0.420
2 Pek. Cor Sloof 20/30, beton K 225 M3 10.320
3 Pek. Cor kolom 12/12, beton K 225 M3 0.492
4 Pek. Cor Kolom 20/20, beton K 225 M3 5.160
5 Pek. Cor ring balok 15/20, beton K 225 M3 3.600
6 Pek. Cor balok kanopi 12/15, beton K 225 M3 1.080
7 Pek. Cor plat dack kanopi tebal 10cm, beton K 225 M3 6.848
8 Pek. Cor meja beton tebal 10cm, beton K 225 M3 0.660
9 Pek. Cor lantai kerja tebal 7cm, beton K 100 M3 12.594
10 Pek. Cor lantai rabat tebal 10cm, beton K 100 M3 5.137
SUB JUMLAH III

IV. PEKERJAAN PASANGAN DAN PLESTERAN


1 Pas. batu kosong (Aanstamping) M3 20.400
2 Pas. pondasi batu belah 1pc : 4ps M3 48.000
3 Pasang batu tela, 1 Pc : 2 M2 19.500
4 Pasang batu tela, 1 Pc : 4 M2 386.475
5 Plesteran dinding, 1pc : 2ps M2 39.000
6 Plesteran pelengkungan sudut dinding, 1pc : 2ps M2 14.250
7 Plesteran dinding, 1pc : 4ps M2 772.950
8 Plesteran kolom, 1pc : 4ps M2 45.600
VOLUME
NO. URAIAN PEKERJAAN SAT.
(Kontrak)

9 Plesteran plat dack kanopi, 1pc : 2ps M2 68.477


10 Acian dinding dan kolom M2 818.550
11 Acian lantai rabat bangunan M2 85.740
12 Pemb. saluran rabat bangunan M' 22.500
JUMLAH IV

V. PEKERJAAN PENUTUP LANTAI DAN DINDING


1 Pas. Keramik lantai 40/40 (polos) M2 178.370
2 Pas. Keramik lantai 40/40 (non slipery) M2 47.800
3 Pas. Keramik lantai KM/WC 20/20 M2 6.000
4 Pas. Keramik meja beton/WC 20/20 M2 6.600
5 Pas. Keramik dinding KM/WC 20/25 M2 30.220
6 Pas. List keramik dinding KM/WC (5/20) M' 25.660
7 Pas. Pas. plint keramik 10/40 M' 98.300
8 Pas. Pas. plint keramik P=40cm (Lengkung) M' 42.830
9 Pas. Keramik kolom selasar 30/30 M2 14.400
10 Pas. List kuku macan M' 48.000
JUMLAH V M'

VI. PEKERJAAN KUSEN PINTU DAN JENDELA


1 Pas. Kusen aluminium M' 181.020
2 Pas. Pintu Kaca polos 6mm Rangka Alumunium M2 19.740
3 Pas. Pintu Alumunium M2 2.940
4 Pas. Jendela Kaca polos 6mm Rangka Alumunium M2 10.360
5 Pas. Jendela Vent. Kaca polos 6mm Rangka Alumunium M2 9.615
6 Pas. Jendela kaca mati, kaca polos 6mm M2 4.080
7 Pas. Jendela ventilasi kaca mati, kaca sand blast 5 mm M2 0.490
8 Kusen lemari meja beton, kayu besi 5/10 M3 0.142
9 Daun pintu lemari meja beton, panel kayu kls I M2 6.024
JUMLAH VI

VII. PEKERJAAN PENGUNCI DAN PENGGANTUNG


1 Engsel pintu kuningan Psg 30.000
2 Engsel jendela kuningan Psg 120.000
3 Pas. Kunci pintu 2 slag Bh 13.000
4 Pas kunci tanam 1 slag utk WC/KM Bh 2.000
5 Pas. Kait angin jendela kuningan Bh 60.000
6 Pas. Grendel pintu kuningan Bh 15.000
7 Pas. Grendel jendela kuningan Bh 60.000
8 Pas. Handel jendela Bh 60.000
9 Pas. Door Closer Bh 13.000
JUMLAH VII
VOLUME
NO. URAIAN PEKERJAAN SAT.
(Kontrak)

VIII. PEKERJAAN KONSTRUKSI ATAP


1 Pek. kuda-kuda kayu klas I M3 3.698
2 Pek. Gording kayu klas II M3 1.804
3 Pek. Balok skur kayu klas II M3 0.160
4 Kaso 5/7 & reng 2/3 M2 330.108
5 Pas. Allumunium foil M2 330.108
6 Atap genteng metal roof M2 330.108
7 Pas. Nok genteng metal M' 35.450
8 Pas. Lisplank papan ky. Besi 2,5/30 M' 70.400
JUMLAH VIII

IX. PEKERJAAN PLAFOND


1 Pekerjaan rangka plafond, Besi hollow M2 270.360
2 Pasang plafond gibsum 9 mm M2 270.360
3 Pek. List Plafond Gypsum profil sedang M' 215.580
JUMLAH IX

X. PEKERJAAN PENGECATAN
1 Cat Dinding tembok dalam (Interior) M2 606.800
2 Cat Dinding Tembok Luar (Exterior) M2 211.750
3 Cat plafond M2 270.360
4 Mendempul dan menggosok kayu M2 35.344
5 Pekerjaan cat kilat kayu u/kusen dan lisplang M2 23.296
6 Pekerjaan cat politur u/pintu M2 12.048
7 Pekerjaan residu kuda-kuda dan gording M3 264.086
8 Pekerjaan water proofing u/ atap dack M2 54.782
JUMLAH X

XI. PEKERJAAN INSTALASI LISTRIK


1 Pas. lampu SL 1x18 W Ttk 17.000
2 Pas. Lampu downlight 20 Watt Ttk 20.000
3 Saklar tunggal Ttk 6.000
4 Saklar ganda Ttk 5.000
5 Pas. stop kontak biasa H=+30cm Ttk 16.000
6 Pas. stop kontak + panel AC H=+220cm Ttk 6.000
7 Pas Outlet Telepon Ttk 1.000
8 Pas. Outlet TV Ttk 1.000
9 Sekring Khass 2 group+limit/MCB Set 1.000
JUMLAH XI

XII. PEKERJAAN SELASAR PENGHUBUNG BANGUNAN


- Pekerjaan Tanah dan Pasir
1 Pengukuran dan pasang bouwplank M1 22.000
2 Galian tanah biasa u/ pondasi sedalam 1M M3 24.420
3 Urugan tanah kembali sedalam 1M = 1/3 galian M3 8.140
4 Urugan tanah peninggian lantai M3 8.633
5 Urugan pasir dibawah pondasi & lantai M3 3.758
- Pekerjaan Pasangan
1 Pas. batu kosong (Aanstamping) M3 3.740
VOLUME
NO. URAIAN PEKERJAAN SAT.
(Kontrak)

2 Pas. pondasi batu belah 1pc : 4ps M3 8.800


3 Plesteran kolom dan balok, 1pc : 4ps M2 35.000
4 Acian kolom dan balok M2 35.000
5 Pas. Keramik lantai 30/30 M2 33.750
6 Pas. Keramik kolom selasar 30/30 M2 24.000
7 Pas. List kuku macan M' 80.000
8 Acian lantai rabat M2 23.800
9 Pemb. saluran rabat M' 22.500
- Pekerjaan Beton
1 Pek. Cor Sloof 20/30, beton K 225 M3 1.320
2 Pek. Cor Kolom 20/20, beton K 225 M3 1.650
3 Pek. Cor ring balok 15/20, beton K 225 M3 0.660
4 Pek. Cor lantai kerja tebal 7cm, beton K 100 M3 4.029
- Pekerjaan Konstruksi Atap
1 Pek. kuda-kuda kayu klas I M3 0.356
2 Pek. Gording kayu klas II M3 0.456
3 Pas. Atap spandek (Galvanis) M2 66.453
4 Pas. Bubungan atap spandek M' 14.400
5 Pek. Jurai dalam seng BJLS 30mm M' 3.000
6 Pas. Lisplank papan ky. Besi 2,5/30 M' 22.500
- Pekerjaan Pengecatan
1 Cat kolom dan balok M2 19.000
2 Pek. cat kilat kayu u/gording, kuda-kuda dan lisplang M2 50.781
JUMLAH XII

XIII. PEKERJAAN TOWER AIR


- Pekerjaan Tanah dan Pasir
1 Pengukuran dan pasang bouwplank M1 17.750
2 Galian tanah biasa u/ pondasi sedalam 1M M3 27.027
3 Urugan tanah kembali sedalam 1M = 1/3 galian M3 9.009
4 Urugan tanah peninggian lantai M3 2.780
5 Pemadatan tanah urugan peninggian lantai M3 2.780
6 Urugan pasir dibawah pondasi & lantai M3 1.468
- Pekerjaan Pasangan
1 Pek. Cerucuk 10/10, kayu besi M3 2.160
2 Pas. pondasi batu belah 1pc : 4ps M3 2.800
3 Pekerjaan acian lantai M2 27.500
4 Pek. lantai papan kayu klas I M2 7.000
VOLUME
NO. URAIAN PEKERJAAN SAT.
(Kontrak)

- Pekerjaan Beton
1 Pek. Cor Pondasi Poer Plat 120x120, beton K 225 M3 3.096
2 Pek. Cor Kolom Pendek 35/35, beton K 225 M3 1.176
3 Pek. Cor Sloof 25/30, beton K 225 M3 1.331
4 Pek. Cor lantai kerja tebal 7cm, beton K 100 M3 1.925
- Pekerjaan Konstruksi Besi
1 Pek. Besi siku L 40. 40. 2,5 M' 10.860
2 Pek. Besi siku L 50. 50. 3 M' 17.700
3 Pek. Besi siku L 75. 75. 5 M' 76.800
4 Pek. Besi siku L 100. 100. 5 M' 36.000
5 Pas. Angker, Baut+Mur & Plat Buhul Baja +Acc Ls 1.000
6 Pek. cat kilat besi M2 42.718
JUMLAH XIII

XIV. PEKERJAAN GROUND RESERVOIR


- Pekerjaan Tanah dan Pasir
1 Pengukuran dan pasang bouwplank M1 10.000
2 Galian tanah biasa u/ pondasi sedalam 1M M3 12.790
3 Urugan tanah kembali sedalam 1M = 1/3 galian M3 4.263
4 Urugan tanah peninggian lantai M3 0.500
5 Pemadatan tanah urugan peninggian lantai M3 0.500
6 Urugan pasir dibawah pondasi & lantai M3 0.750
- Pekerjaan Pasangan
1 Pas. batu kosong (Aanstamping) M3 1.000
2 Pas. pondasi batu belah 1pc : 4ps M3 1.870
3 Pasang 1 batu tela, 1 Pc : 4 M2 18.000
4 Plesteran dinding, 1pc : 2ps M2 42.000
5 Plesteran penutup beton, 1pc : 2ps M2 7.000
6 Pekerjaan acian penutup beton M2 7.000
7 Pas. Keramik lantai dan dinding, 20/20 M2 90.000
- Pekerjaan Beton
1 Pek. Cor Sloof 20/30, beton K 225 M3 0.600
2 Pek. Cor kolom 20/20, beton K 225 M3 0.432
3 Pek. Cor ring balok 20/20 beton K 225 M3 0.400
4 Pek. Cor plat dack tebal 10 cm beton K 225 M3 0.700
5 Pek. Cor lantai kerja tebal 7cm, beton K 100 M3 0.600
- Aksesories Penunjang
1 Besi plat penutup lobang kontrol M2 0.360
2 Profil tank kapasitas 2200 Liter + ACC Bh 2.000
3 Pompa air Bh 1.000
JUMLAH XIV

XV. PEKERJAAN SANITASI


1 Kran air stainlees Bh 2.000
2 Kran air stainlees leher angsa Bh 3.000
3 Floor drain stainless Bh 2.000
4 Kloset duduk +Assesories Bh 2.000
5 Kitchen zinc lengkap terpasang Bh 3.000
JUMLAH XV
VOLUME
NO. URAIAN PEKERJAAN SAT.
(Kontrak)

XVI. PEKERJAAN PLUMBING


1 Pipa GIP medium Ø 1/2" untuk instalasi air bersih M' 40.000
2 Pipa GIP medium Ø 3/4" untuk instalasi air bersih M' 20.000
3 Pas. Pipa PVC Ø 2" untuk instalasi air kotor M' 31.000
4 Pas. Pipa PVC Ø 4" untuk instalasi air kotor M' 22.000
5 Septic tank dan peresapan Unit 1.000
JUMLAH XV

XVII. PEKERJAAN AKHIR


1 Pek. Pembersihan/perapihan bangunan + halaman Ls 1.000
2 Pembuatan pelaporan + dokumentasi Pekerjaan Ls 1.000
JUMLAH XIII

JUMLAH
PPN 10 %
TOTAL BIAYA FISIK ( REAL COST + PPn 10% )
DIBULATKAN

BOBOT PEKERJAAN YANG DICAPAI


NILAI YANG DITAGIHKAN
TERBILANG :

: Mengetahui Oleh
PEJABAT PELAKSANA TEKNIS KEGIATAN
(PPTK)

Drg. MARYEN BRAWERY, M.Kes


NIP. 19740117 200112 2 003
BOT PEKERJAAN
NSFUSI DARAH (UTD)

Minggu 13 : (18 Sep s/d 24 September 2018)


HARGA/NILAI BOBOT PRESTASI PEKERJAAN
(Kontrak) (Kontrak) Volume Bobot
Tercapai Tercapai Nilai Yang Tagihkan

850,000.00 0.047 #REF! #REF! #REF!


2,668,000.00 0.147 #REF! #REF! #REF!
13,558,512.76 0.749 #REF! #REF! #REF!
17,076,512.76 0.943 #REF! #REF!

12,325,080.00 0.681 #REF! #REF! #REF!


12,947,040.00 0.715 #REF! #REF! #REF!
1,438,560.00 0.079 #REF! #REF! #REF!
1,734,336.00 0.096 #REF! #REF! #REF!
4,576,117.80 0.253 #REF! #REF! #REF!
15,328,702.80 0.847 #REF! #REF! #REF!
3,301,005.60 0.182 #REF! #REF! #REF!
51,650,842.20 2.853 #REF! #REF!

4,687,772.82 0.259 #REF! #REF! #REF!


99,741,317.17 5.509 #REF! #REF! #REF!
7,731,724.55 0.427 #REF! #REF! #REF!
93,328,241.95 5.155 #REF! #REF! #REF!
40,875,441.17 2.258 #REF! #REF! #REF!
16,343,031.79 0.903 #REF! #REF! #REF!
99,684,204.78 5.506 #REF! #REF! #REF!
9,607,835.50 0.531 #REF! #REF! #REF!
20,472,308.05 1.131 #REF! #REF! #REF!
8,349,588.51 0.461 #REF! #REF! #REF!
400,821,466.28 22.140 #REF! #REF!

14,849,372.16 0.820 #REF! #REF! #REF!


42,361,248.00 2.340 #REF! #REF! #REF!
3,973,916.70 0.220 #REF! #REF! #REF!
71,217,332.80 3.934 #REF! #REF! #REF!
4,091,926.80 0.226 #REF! #REF! #REF!
1,495,127.10 0.083 #REF! #REF! #REF!
73,307,196.36 4.049 #REF! #REF! #REF!
4,324,740.48 0.239 #REF! #REF! #REF!
Minggu 13 : (18 Sep s/d 24 September 2018)
HARGA/NILAI BOBOT PRESTASI PEKERJAAN
(Kontrak) (Kontrak) Volume Bobot
Tercapai Tercapai Nilai Yang Tagihkan
7,184,689.01 0.397 #REF! #REF! #REF!
46,149,849.00 2.549 #REF! #REF! #REF!
4,834,021.20 0.267 #REF! #REF! #REF!
6,510,772.13 0.360 #REF! #REF! #REF!
280,300,191.73 15.483 #REF! #REF!

51,170,339.68 2.826 #REF! #REF! #REF!


19,179,511.00 1.059 #REF! #REF! #REF!
2,183,145.00 0.121 #REF! #REF! #REF!
2,401,459.50 0.133 #REF! #REF! #REF!
12,376,075.17 0.684 #REF! #REF! #REF!
1,433,575.45 0.079 #REF! #REF! #REF!
5,185,138.23 0.286 #REF! #REF! #REF!
2,747,248.97 0.152 #REF! #REF! #REF!
6,208,335.84 0.343 #REF! #REF! #REF!
2,681,668.80 0.148 #REF! #REF! #REF!
105,566,497.64 5.831 #REF! #REF!

47,566,770.22 2.627 #REF! #REF! #REF!


21,268,784.04 1.175 #REF! #REF! #REF!
4,250,586.14 0.235 #REF! #REF! #REF!
11,162,340.56 0.617 #REF! #REF! #REF!
10,359,643.29 0.572 #REF! #REF! #REF!
2,904,486.72 0.160 #REF! #REF! #REF!
339,606.26 0.019 #REF! #REF!
1,888,515.92 0.104 #REF! #REF!
6,462,727.92 0.357 #REF! #REF! #REF!
106,203,461.07 5.866 #REF! #REF!

2,155,500.00 0.119 #REF! #REF! #REF!


7,384,800.00 0.408 #REF! #REF! #REF!
3,876,600.00 0.214 #REF! #REF! #REF!
522,000.00 0.029 #REF! #REF! #REF!
3,102,000.00 0.171 #REF! #REF! #REF!
828,000.00 0.046 #REF! #REF! #REF!
3,102,000.00 0.171 #REF! #REF! #REF!
1,692,000.00 0.093 #REF! #REF! #REF!
7,965,100.00 0.440 #REF! #REF!
30,628,000.00 1.692 #REF! #REF!
Minggu 13 : (18 Sep s/d 24 September 2018)
HARGA/NILAI BOBOT PRESTASI PEKERJAAN
(Kontrak) (Kontrak) Volume Bobot
Tercapai Tercapai Nilai Yang Tagihkan

43,398,377.00 2.397 #REF! #REF! #REF!


18,870,273.22 1.042 #REF! #REF! #REF!
1,674,009.60 0.092 #REF! #REF! #REF!
51,115,903.37 2.823 #REF! #REF! #REF!
16,732,844.41 0.924 #REF! #REF! #REF!
43,546,526.93 2.405 #REF! #REF! #REF!
4,022,582.40 0.222 #REF! #REF! #REF!
6,861,888.00 0.379 #REF! #REF! #REF!
186,222,404.92 10.286 #REF! #REF!

34,436,564.28 1.902 #REF! #REF! #REF!


19,915,744.97 1.100 #REF! #REF! #REF!
10,610,093.07 0.586 #REF! #REF! #REF!
64,962,402.32 3.588 #REF! #REF!

28,179,185.200 1.557 #REF! #REF! #REF!


20,143,565.750 1.113 #REF! #REF! #REF!
12,555,248.040 0.694 #REF! #REF! #REF!
862,464.288 0.048 #REF! #REF! #REF!
2,807,121.408 0.155 #REF! #REF! #REF!
1,342,894.176 0.074 #REF! #REF! #REF!
13,661,189.472 0.755 #REF! #REF! #REF!
2,031,739.981 0.112 #REF! #REF! #REF!
81,583,408.315 4.506 #REF! #REF!

5,265,693.33 0.291 #REF! #REF! #REF!


15,121,633.33 0.835 #REF! #REF! #REF!
1,406,680.00 0.078 #REF! #REF! #REF!
1,203,733.33 0.066 #REF! #REF! #REF!
10,908,986.67 0.603 #REF! #REF! #REF!
5,168,680.00 0.286 #REF! #REF! #REF!
857,171.67 0.047 #REF! #REF! #REF!
921,171.67 0.051 #REF! #REF! #REF!
851,801.67 0.047 #REF! #REF! #REF!
41,705,551.67 2.304 #REF! #REF!

2,259,598.00 0.125 - - -
2,373,624.00 0.131 - - -
263,736.00 0.015 - - -
2,902,246.50 0.160 - - -
1,357,659.90 0.075 - - -

2,722,384.90 0.150 - - -
Minggu 13 : (18 Sep s/d 24 September 2018)
HARGA/NILAI BOBOT PRESTASI PEKERJAAN
(Kontrak) (Kontrak) Volume Bobot
Tercapai Tercapai Nilai Yang Tagihkan
7,766,228.80 0.429 - - -
3,319,428.00 0.183 - - -
1,973,300.00 0.109 - - -
12,710,522.81 0.702 - - -
10,347,226.40 0.572 - - -
4,469,448.00 0.247 - - -
1,341,844.00 0.074 - - -
6,510,772.13 0.360 - - -

12,757,610.34 0.705 - - -
29,843,333.18 1.648 - - -
7,493,830.88 0.414 - - -
6,548,362.21 0.362 - - -

4,182,354.00 0.231 - - -
4,766,742.34 0.263 - - -
16,841,055.01 0.930 - - -
2,506,752.00 0.138 - - -
575,712.00 0.032 - - -
2,193,075.00 0.121 - - -

882,341.00 0.049 - - -
6,119,008.94 0.338 - - -
155,028,196.32 8.563 - -

1,823,084.75 0.101 - - -
2,627,024.40 0.145 - - -
291,891.60 0.016 - - -
934,467.90 0.052 - - -
201,235.80 0.011 - - -
530,237.10 0.029 - -

21,702,038.40 1.199 - -
2,471,072.80 0.136 - - -
1,550,450.00 0.086 - - -
3,526,698.00 0.195 - - -
Minggu 13 : (18 Sep s/d 24 September 2018)
HARGA/NILAI BOBOT PRESTASI PEKERJAAN
(Kontrak) (Kontrak) Volume Bobot
Tercapai Tercapai Nilai Yang Tagihkan
-
24,297,005.35 1.342 - - -
15,365,053.89 0.849 - -
12,866,339.97 0.711 - -
3,129,104.44 0.173 - -
-
2,363,222.88 0.131 - - -
5,024,109.60 0.278 - - -
24,082,022.40 1.330 - - -
12,670,848.00 0.700 - - -
2,500,000.00 0.138 - -
4,367,148.40 0.241 - -
142,323,055.69 7.861 - -

1,027,090.00 0.057 - - -
1,243,188.00 0.069 - - -
138,132.00 0.008 - - -
168,100.00 0.009 - - -
36,200.00 0.002 - - -
270,990.00 0.015 - - -

727,910.40 0.040 - - -
1,650,323.62 0.091 - - -
7,100,443.80 0.392 - - -
8,559,205.20 0.473 - - -
1,426,534.20 0.079 - - -
394,660.00 0.022 - - -
32,747,175.00 1.809 - - -

5,798,913.79 0.320 - - -
7,813,527.23 0.432 - - -
4,187,767.44 0.231 - - -
10,190,128.56 0.563 - - -
975,305.28 0.054 - - -

386,909.68 0.021 - - -
15,875,000.00 0.877 - - -
3,302,000.00 0.182 - - -
104,019,504.20 5.746 - -

-
144,485.00 0.008 - - -
952,500.00 0.053 - - -
122,400.00 0.007 - - -
9,390,372.00 0.519 - - -
3,969,765.00 0.219 - - -
14,579,522.00 0.805 - -
Minggu 13 : (18 Sep s/d 24 September 2018)
HARGA/NILAI BOBOT PRESTASI PEKERJAAN
(Kontrak) (Kontrak) Volume Bobot
Tercapai Tercapai Nilai Yang Tagihkan

2,924,700.00 0.162 - - -
1,507,440.00 0.083 - - -
2,515,839.10 0.139 - -
5,426,092.10 0.300 - - -
11,336,394.95 0.626 - - -
23,710,466.15 1.310 - -

1,500,000.000 0.083 - - -
2,500,000.000 0.138 - - -
4,000,000.000 0.221 - -

1,810,381,483.27 100.00 #REF! #REF!


181,038,148.33 #REF!
1,991,419,631.60 #REF!
1,991,419,000.00 #REF!

OT PEKERJAAN YANG DICAPAI : #REF! %


I YANG DITAGIHKAN : #REF!
Delapan Ratus Sembilan Puluh Delapan Juta Sembilan Ratus Delapan Puluh Tiga Ribu
Rupiah

: Di Buat Oleh
KONTRAKTOR PELAKSANA
PT. BUNTU RANNU

IRWANTO TANDI ARANG


Kepala Cabang
BOBOT PEKERJAAN
PEKERJAAN : PEMBANGUNAN GEDUNG UNIT TRANSFUSI DARAH (UTD)
NILAI KONTRAK : Rp. 1.991.419.000,-
LOKASI : SENTANI - KABUPATEN JAYAPURA
INSTANSI : RUMAH SAKIT DAERAH YOWARI
TAHUN : 2018
KONTRAKTOR : PT. BUNTU RANNU
NOMOR KONTRAK : 27/SPMK-UTD/RSUD/VI/2018
TANGGAL : 26 Juni 2018
KONSULTAN PENGAWAS : CV. BINA KARYA GEMILANG

VOLUME
NO. URAIAN PEKERJAAN SAT.
(Kontrak)

I. PEKERJAAN PENDAHULUAN
1 Papan nama proyek Ls 1.000
2 Pembersihan lokasi pekerjaan M2 200.000
3 Pembuatan Direksi Keet dan Gudang Bahan M2 36.000
JUMLAH I

II. PEKERJAAN TANAH DAN PASIR


1 Pengukuran dan Pasang Bouwplank M1 120.000
2 Galian tanah biasa u/ pondasi sedalam 1M M3 133.200
3 Urugan tanah kembali 1/3 galian M3 44.400
4 Urugan pasir dibawah pondasi M3 4.800
5 Urugan pasir dibawah lantai tebal 5cm M3 12.665
6 Urugan tanah peninggian lantai M3 45.594
7 Pemadatan tanah M3 45.594
JUMLAH II

III. PEKERJAAN STRUKTUR BETON


1 Pek. Cor Sloof 15/20, beton K 225 M3 0.420
2 Pek. Cor Sloof 20/30, beton K 225 M3 10.320
3 Pek. Cor kolom 12/12, beton K 225 M3 0.492
4 Pek. Cor Kolom 20/20, beton K 225 M3 5.160
5 Pek. Cor ring balok 15/20, beton K 225 M3 3.600
6 Pek. Cor balok kanopi 12/15, beton K 225 M3 1.080
7 Pek. Cor plat dack kanopi tebal 10cm, beton K 225 M3 6.848
8 Pek. Cor meja beton tebal 10cm, beton K 225 M3 0.660
9 Pek. Cor lantai kerja tebal 7cm, beton K 100 M3 12.594
10 Pek. Cor lantai rabat tebal 10cm, beton K 100 M3 5.137
SUB JUMLAH III

IV. PEKERJAAN PASANGAN DAN PLESTERAN


1 Pas. batu kosong (Aanstamping) M3 20.400
2 Pas. pondasi batu belah 1pc : 4ps M3 48.000
3 Pasang batu tela, 1 Pc : 2 M2 19.500
4 Pasang batu tela, 1 Pc : 4 M2 386.475
5 Plesteran dinding, 1pc : 2ps M2 39.000
6 Plesteran pelengkungan sudut dinding, 1pc : 2ps M2 14.250
7 Plesteran dinding, 1pc : 4ps M2 772.950
8 Plesteran kolom, 1pc : 4ps M2 45.600
VOLUME
NO. URAIAN PEKERJAAN SAT.
(Kontrak)

9 Plesteran plat dack kanopi, 1pc : 2ps M2 68.477


10 Acian dinding dan kolom M2 818.550
11 Acian lantai rabat bangunan M2 85.740
12 Pemb. saluran rabat bangunan M' 22.500
JUMLAH IV

V. PEKERJAAN PENUTUP LANTAI DAN DINDING


1 Pas. Keramik lantai 40/40 (polos) M2 178.370
2 Pas. Keramik lantai 40/40 (non slipery) M2 47.800
3 Pas. Keramik lantai KM/WC 20/20 M2 6.000
4 Pas. Keramik meja beton/WC 20/20 M2 6.600
5 Pas. Keramik dinding KM/WC 20/25 M2 30.220
6 Pas. List keramik dinding KM/WC (5/20) M' 25.660
7 Pas. Pas. plint keramik 10/40 M' 98.300
8 Pas. Pas. plint keramik P=40cm (Lengkung) M' 42.830
9 Pas. Keramik kolom selasar 30/30 M2 14.400
10 Pas. List kuku macan M' 48.000
JUMLAH V M'

VI. PEKERJAAN KUSEN PINTU DAN JENDELA


1 Pas. Kusen aluminium M' 181.020
2 Pas. Pintu Kaca polos 6mm Rangka Alumunium M2 19.740
3 Pas. Pintu Alumunium M2 2.940
4 Pas. Jendela Kaca polos 6mm Rangka Alumunium M2 10.360
5 Pas. Jendela Vent. Kaca polos 6mm Rangka Alumunium M2 9.615
6 Pas. Jendela kaca mati, kaca polos 6mm M2 4.080
7 Pas. Jendela ventilasi kaca mati, kaca sand blast 5 mm M2 0.490
8 Kusen lemari meja beton, kayu besi 5/10 M3 0.142
9 Daun pintu lemari meja beton, panel kayu kls I M2 6.024
JUMLAH VI

VII. PEKERJAAN PENGUNCI DAN PENGGANTUNG


1 Engsel pintu kuningan Psg 30.000
2 Engsel jendela kuningan Psg 120.000
3 Pas. Kunci pintu 2 slag Bh 13.000
4 Pas kunci tanam 1 slag utk WC/KM Bh 2.000
5 Pas. Kait angin jendela kuningan Bh 60.000
6 Pas. Grendel pintu kuningan Bh 15.000
7 Pas. Grendel jendela kuningan Bh 60.000
8 Pas. Handel jendela Bh 60.000
9 Pas. Door Closer Bh 13.000
JUMLAH VII
VOLUME
NO. URAIAN PEKERJAAN SAT.
(Kontrak)

VIII. PEKERJAAN KONSTRUKSI ATAP


1 Pek. kuda-kuda kayu klas I M3 3.698
2 Pek. Gording kayu klas II M3 1.804
3 Pek. Balok skur kayu klas II M3 0.160
4 Kaso 5/7 & reng 2/3 M2 330.108
5 Pas. Allumunium foil M2 330.108
6 Atap genteng metal roof M2 330.108
7 Pas. Nok genteng metal M' 35.450
8 Pas. Lisplank papan ky. Besi 2,5/30 M' 70.400
JUMLAH VIII

IX. PEKERJAAN PLAFOND


1 Pekerjaan rangka plafond, Besi hollow M2 270.360
2 Pasang plafond gibsum 9 mm M2 270.360
3 Pek. List Plafond Gypsum profil sedang M' 215.580
JUMLAH IX

X. PEKERJAAN PENGECATAN
1 Cat Dinding tembok dalam (Interior) M2 606.800
2 Cat Dinding Tembok Luar (Exterior) M2 211.750
3 Cat plafond M2 270.360
4 Mendempul dan menggosok kayu M2 35.344
5 Pekerjaan cat kilat kayu u/kusen dan lisplang M2 23.296
6 Pekerjaan cat politur u/pintu M2 12.048
7 Pekerjaan residu kuda-kuda dan gording M3 264.086
8 Pekerjaan water proofing u/ atap dack M2 54.782
JUMLAH X

XI. PEKERJAAN INSTALASI LISTRIK


1 Pas. lampu SL 1x18 W Ttk 17.000
2 Pas. Lampu downlight 20 Watt Ttk 20.000
3 Saklar tunggal Ttk 6.000
4 Saklar ganda Ttk 5.000
5 Pas. stop kontak biasa H=+30cm Ttk 16.000
6 Pas. stop kontak + panel AC H=+220cm Ttk 6.000
7 Pas Outlet Telepon Ttk 1.000
8 Pas. Outlet TV Ttk 1.000
9 Sekring Khass 2 group+limit/MCB Set 1.000
JUMLAH XI

XII. PEKERJAAN SELASAR PENGHUBUNG BANGUNAN


- Pekerjaan Tanah dan Pasir
1 Pengukuran dan pasang bouwplank M1 22.000
2 Galian tanah biasa u/ pondasi sedalam 1M M3 24.420
3 Urugan tanah kembali sedalam 1M = 1/3 galian M3 8.140
4 Urugan tanah peninggian lantai M3 8.633
5 Urugan pasir dibawah pondasi & lantai M3 3.758
- Pekerjaan Pasangan
1 Pas. batu kosong (Aanstamping) M3 3.740
VOLUME
NO. URAIAN PEKERJAAN SAT.
(Kontrak)

2 Pas. pondasi batu belah 1pc : 4ps M3 8.800


3 Plesteran kolom dan balok, 1pc : 4ps M2 35.000
4 Acian kolom dan balok M2 35.000
5 Pas. Keramik lantai 30/30 M2 33.750
6 Pas. Keramik kolom selasar 30/30 M2 24.000
7 Pas. List kuku macan M' 80.000
8 Acian lantai rabat M2 23.800
9 Pemb. saluran rabat M' 22.500
- Pekerjaan Beton
1 Pek. Cor Sloof 20/30, beton K 225 M3 1.320
2 Pek. Cor Kolom 20/20, beton K 225 M3 1.650
3 Pek. Cor ring balok 15/20, beton K 225 M3 0.660
4 Pek. Cor lantai kerja tebal 7cm, beton K 100 M3 4.029
- Pekerjaan Konstruksi Atap
1 Pek. kuda-kuda kayu klas I M3 0.356
2 Pek. Gording kayu klas II M3 0.456
3 Pas. Atap spandek (Galvanis) M2 66.453
4 Pas. Bubungan atap spandek M' 14.400
5 Pek. Jurai dalam seng BJLS 30mm M' 3.000
6 Pas. Lisplank papan ky. Besi 2,5/30 M' 22.500
- Pekerjaan Pengecatan
1 Cat kolom dan balok M2 19.000
2 Pek. cat kilat kayu u/gording, kuda-kuda dan lisplang M2 50.781
JUMLAH XII

XIII. PEKERJAAN TOWER AIR


- Pekerjaan Tanah dan Pasir
1 Pengukuran dan pasang bouwplank M1 17.750
2 Galian tanah biasa u/ pondasi sedalam 1M M3 27.027
3 Urugan tanah kembali sedalam 1M = 1/3 galian M3 9.009
4 Urugan tanah peninggian lantai M3 2.780
5 Pemadatan tanah urugan peninggian lantai M3 2.780
6 Urugan pasir dibawah pondasi & lantai M3 1.468
- Pekerjaan Pasangan
1 Pek. Cerucuk 10/10, kayu besi M3 2.160
2 Pas. pondasi batu belah 1pc : 4ps M3 2.800
3 Pekerjaan acian lantai M2 27.500
4 Pek. lantai papan kayu klas I M2 7.000
VOLUME
NO. URAIAN PEKERJAAN SAT.
(Kontrak)

- Pekerjaan Beton
1 Pek. Cor Pondasi Poer Plat 120x120, beton K 225 M3 3.096
2 Pek. Cor Kolom Pendek 35/35, beton K 225 M3 1.176
3 Pek. Cor Sloof 25/30, beton K 225 M3 1.331
4 Pek. Cor lantai kerja tebal 7cm, beton K 100 M3 1.925
- Pekerjaan Konstruksi Besi
1 Pek. Besi siku L 40. 40. 2,5 M' 10.860
2 Pek. Besi siku L 50. 50. 3 M' 17.700
3 Pek. Besi siku L 75. 75. 5 M' 76.800
4 Pek. Besi siku L 100. 100. 5 M' 36.000
5 Pas. Angker, Baut+Mur & Plat Buhul Baja +Acc Ls 1.000
6 Pek. cat kilat besi M2 42.718
JUMLAH XIII

XIV. PEKERJAAN GROUND RESERVOIR


- Pekerjaan Tanah dan Pasir
1 Pengukuran dan pasang bouwplank M1 10.000
2 Galian tanah biasa u/ pondasi sedalam 1M M3 12.790
3 Urugan tanah kembali sedalam 1M = 1/3 galian M3 4.263
4 Urugan tanah peninggian lantai M3 0.500
5 Pemadatan tanah urugan peninggian lantai M3 0.500
6 Urugan pasir dibawah pondasi & lantai M3 0.750
- Pekerjaan Pasangan
1 Pas. batu kosong (Aanstamping) M3 1.000
2 Pas. pondasi batu belah 1pc : 4ps M3 1.870
3 Pasang 1 batu tela, 1 Pc : 4 M2 18.000
4 Plesteran dinding, 1pc : 2ps M2 42.000
5 Plesteran penutup beton, 1pc : 2ps M2 7.000
6 Pekerjaan acian penutup beton M2 7.000
7 Pas. Keramik lantai dan dinding, 20/20 M2 90.000
- Pekerjaan Beton
1 Pek. Cor Sloof 20/30, beton K 225 M3 0.600
2 Pek. Cor kolom 20/20, beton K 225 M3 0.432
3 Pek. Cor ring balok 20/20 beton K 225 M3 0.400
4 Pek. Cor plat dack tebal 10 cm beton K 225 M3 0.700
5 Pek. Cor lantai kerja tebal 7cm, beton K 100 M3 0.600
- Aksesories Penunjang
1 Besi plat penutup lobang kontrol M2 0.360
2 Profil tank kapasitas 2200 Liter + ACC Bh 2.000
3 Pompa air Bh 1.000
JUMLAH XIV

XV. PEKERJAAN SANITASI


1 Kran air stainlees Bh 2.000
2 Kran air stainlees leher angsa Bh 3.000
3 Floor drain stainless Bh 2.000
4 Kloset duduk +Assesories Bh 2.000
5 Kitchen zinc lengkap terpasang Bh 3.000
JUMLAH XV
VOLUME
NO. URAIAN PEKERJAAN SAT.
(Kontrak)

XVI. PEKERJAAN PLUMBING


1 Pipa GIP medium Ø 1/2" untuk instalasi air bersih M' 40.000
2 Pipa GIP medium Ø 3/4" untuk instalasi air bersih M' 20.000
3 Pas. Pipa PVC Ø 2" untuk instalasi air kotor M' 31.000
4 Pas. Pipa PVC Ø 4" untuk instalasi air kotor M' 22.000
5 Septic tank dan peresapan Unit 1.000
JUMLAH XV

XVII. PEKERJAAN AKHIR


1 Pek. Pembersihan/perapihan bangunan + halaman Ls 1.000
2 Pembuatan pelaporan + dokumentasi Pekerjaan Ls 1.000
JUMLAH XIII

JUMLAH
PPN 10 %
TOTAL BIAYA FISIK ( REAL COST + PPn 10% )
DIBULATKAN

BOBOT PEKERJAAN YANG DICAPAI


NILAI YANG DITAGIHKAN
TERBILANG :

: Mengetahui Oleh : Disetujui Oleh


PEJABAT PEMBUAT KOMITMEN PEJABAT PELAKSANA TEKNIS KE
(PPTK)

DR. dr. PETRONELLA MARCIA RISAMASU, Drg. MARYEN BRAWERY, M.


M.Ked.Trop NIP. 19740117 200112 2 003
NIP. 19710907 200012 2 005
BOT PEKERJAAN
NSFUSI DARAH (UTD)

Minggu 21 : (13 November s/d 23 Nov 2018)


HARGA/NILAI BOBOT PRESTASI PEKERJAAN
(Kontrak) (Kontrak) Volume Bobot
Tercapai Tercapai Nilai Yang Tagihkan

850,000.00 0.047 #REF! #REF! #REF!


2,668,000.00 0.147 #REF! #REF! #REF!
13,558,512.76 0.749 #REF! #REF! #REF!
17,076,512.76 0.943 #REF! #REF!

12,325,080.00 0.681 #REF! #REF! #REF!


12,947,040.00 0.715 #REF! #REF! #REF!
1,438,560.00 0.079 #REF! #REF! #REF!
1,734,336.00 0.096 #REF! #REF! #REF!
4,576,117.80 0.253 #REF! #REF! #REF!
15,328,702.80 0.847 #REF! #REF! #REF!
3,301,005.60 0.182 #REF! #REF! #REF!
51,650,842.20 2.853 #REF! #REF!

4,687,772.82 0.259 #REF! #REF! #REF!


99,741,317.17 5.509 #REF! #REF! #REF!
7,731,724.55 0.427 #REF! #REF! #REF!
93,328,241.95 5.155 #REF! #REF! #REF!
40,875,441.17 2.258 #REF! #REF! #REF!
16,343,031.79 0.903 #REF! #REF! #REF!
99,684,204.78 5.506 #REF! #REF! #REF!
9,607,835.50 0.531 #REF! #REF! #REF!
20,472,308.05 1.131 #REF! #REF! #REF!
8,349,588.51 0.461 #REF! #REF! #REF!
400,821,466.28 22.140 #REF! #REF!

14,849,372.16 0.820 #REF! #REF! #REF!


42,361,248.00 2.340 #REF! #REF! #REF!
3,973,916.70 0.220 #REF! #REF! #REF!
71,217,332.80 3.934 #REF! #REF! #REF!
4,091,926.80 0.226 #REF! #REF! #REF!
1,495,127.10 0.083 #REF! #REF! #REF!
73,307,196.36 4.049 #REF! #REF! #REF!
4,324,740.48 0.239 #REF! #REF! #REF!
Minggu 21 : (13 November s/d 23 Nov 2018)
HARGA/NILAI BOBOT PRESTASI PEKERJAAN
(Kontrak) (Kontrak) Volume Bobot
Tercapai Tercapai Nilai Yang Tagihkan
7,184,689.01 0.397 #REF! #REF! #REF!
46,149,849.00 2.549 #REF! #REF! #REF!
4,834,021.20 0.267 #REF! #REF! #REF!
6,510,772.13 0.360 #REF! #REF! #REF!
280,300,191.73 15.483 #REF! #REF!

51,170,339.68 2.826 #REF! #REF! #REF!


19,179,511.00 1.059 #REF! #REF! #REF!
2,183,145.00 0.121 #REF! #REF! #REF!
2,401,459.50 0.133 #REF! #REF! #REF!
12,376,075.17 0.684 #REF! #REF! #REF!
1,433,575.45 0.079 #REF! #REF! #REF!
5,185,138.23 0.286 #REF! #REF! #REF!
2,747,248.97 0.152 #REF! #REF! #REF!
6,208,335.84 0.343 #REF! #REF! #REF!
2,681,668.80 0.148 #REF! #REF! #REF!
105,566,497.64 5.831 #REF! #REF!

47,566,770.22 2.627 #REF! #REF! #REF!


21,268,784.04 1.175 #REF! #REF! #REF!
4,250,586.14 0.235 #REF! #REF! #REF!
11,162,340.56 0.617 #REF! #REF! #REF!
10,359,643.29 0.572 #REF! #REF! #REF!
2,904,486.72 0.160 #REF! #REF! #REF!
339,606.26 0.019 #REF! #REF! #REF!
1,888,515.92 0.104 #REF! #REF! #REF!
6,462,727.92 0.357 #REF! #REF! #REF!
106,203,461.07 5.866 #REF! #REF!

2,155,500.00 0.119 #REF! #REF! #REF!


7,384,800.00 0.408 #REF! #REF! #REF!
3,876,600.00 0.214 #REF! #REF! #REF!
522,000.00 0.029 #REF! #REF! #REF!
3,102,000.00 0.171 #REF! #REF! #REF!
828,000.00 0.046 #REF! #REF! #REF!
3,102,000.00 0.171 #REF! #REF! #REF!
1,692,000.00 0.093 #REF! #REF! #REF!
7,965,100.00 0.440 #REF! #REF! #REF!
30,628,000.00 1.692 #REF! #REF!
Minggu 21 : (13 November s/d 23 Nov 2018)
HARGA/NILAI BOBOT PRESTASI PEKERJAAN
(Kontrak) (Kontrak) Volume Bobot
Tercapai Tercapai Nilai Yang Tagihkan

43,398,377.00 2.397 #REF! #REF! #REF!


18,870,273.22 1.042 #REF! #REF! #REF!
1,674,009.60 0.092 #REF! #REF! #REF!
51,115,903.37 2.823 #REF! #REF! #REF!
16,732,844.41 0.924 #REF! #REF! #REF!
43,546,526.93 2.405 #REF! #REF! #REF!
4,022,582.40 0.222 #REF! #REF! #REF!
6,861,888.00 0.379 #REF! #REF! #REF!
186,222,404.92 10.286 #REF! #REF!

34,436,564.28 1.902 #REF! #REF! #REF!


19,915,744.97 1.100 #REF! #REF! #REF!
10,610,093.07 0.586 #REF! #REF! #REF!
64,962,402.32 3.588 #REF! #REF!

28,179,185.200 1.557 #REF! #REF! #REF!


20,143,565.750 1.113 #REF! #REF! #REF!
12,555,248.040 0.694 #REF! #REF! #REF!
862,464.288 0.048 #REF! #REF! #REF!
2,807,121.408 0.155 #REF! #REF! #REF!
1,342,894.176 0.074 #REF! #REF! #REF!
13,661,189.472 0.755 #REF! #REF! #REF!
2,031,739.981 0.112 #REF! #REF! #REF!
81,583,408.315 4.506 #REF! #REF!

5,265,693.33 0.291 #REF! #REF! #REF!


15,121,633.33 0.835 #REF! #REF! #REF!
1,406,680.00 0.078 #REF! #REF! #REF!
1,203,733.33 0.066 #REF! #REF! #REF!
10,908,986.67 0.603 #REF! #REF! #REF!
5,168,680.00 0.286 #REF! #REF! #REF!
857,171.67 0.047 #REF! #REF! #REF!
921,171.67 0.051 #REF! #REF! #REF!
851,801.67 0.047 #REF! #REF! #REF!
41,705,551.67 2.304 #REF! #REF!

2,259,598.00 0.125 22.000 0.125 2,259,598.00


2,373,624.00 0.131 24.420 0.131 2,373,624.00
263,736.00 0.015 8.140 0.015 263,736.00
2,902,246.50 0.160 8.633 0.160 2,902,246.50
1,357,659.90 0.075 3.758 0.075 1,357,659.90

2,722,384.90 0.150 3.740 0.150 2,722,384.90


Minggu 21 : (13 November s/d 23 Nov 2018)
HARGA/NILAI BOBOT PRESTASI PEKERJAAN
(Kontrak) (Kontrak) Volume Bobot
Tercapai Tercapai Nilai Yang Tagihkan
7,766,228.80 0.429 8.800 0.429 7,766,228.80
3,319,428.00 0.183 35.000 0.183 3,319,428.00
1,973,300.00 0.109 35.000 0.109 1,973,300.00
12,710,522.81 0.702 33.750 0.702 12,710,522.81
10,347,226.40 0.572 24.000 0.572 10,347,226.40
4,469,448.00 0.247 80.000 0.247 4,469,448.00
1,341,844.00 0.074 23.800 0.074 1,341,844.00
6,510,772.13 0.360 22.500 0.360 6,510,772.13

12,757,610.34 0.705 1.320 0.705 12,757,610.34


29,843,333.18 1.648 1.650 1.648 29,843,333.18
7,493,830.88 0.414 0.660 0.414 7,493,830.88
6,548,362.21 0.362 4.029 0.362 6,548,362.21

4,182,354.00 0.231 0.356 0.231 4,182,354.00


4,766,742.34 0.263 0.456 0.263 4,766,742.34
16,841,055.01 0.930 66.453 0.930 16,841,055.01
2,506,752.00 0.138 14.400 0.138 2,506,752.00
575,712.00 0.032 3.000 0.032 575,712.00
2,193,075.00 0.121 22.500 0.121 2,193,075.00

882,341.00 0.049 19.000 0.049 882,341.00


6,119,008.94 0.338 50.781 0.338 6,119,008.94
155,028,196.32 8.563 8.563 155,028,196.321

1,823,084.75 0.101 17.750 0.101 1,823,084.75


2,627,024.40 0.145 27.027 0.145 2,627,024.40
291,891.60 0.016 9.009 0.016 291,891.60
934,467.90 0.052 2.780 0.052 934,467.90
201,235.80 0.011 2.780 0.011 201,235.80
530,237.10 0.029 1.468 0.029 530,237.10

21,702,038.40 1.199 2.160 1.199 21,702,038.40


2,471,072.80 0.136 2.800 0.136 2,471,072.80
1,550,450.00 0.086 27.500 0.086 1,550,450.00
3,526,698.00 0.195 7.000 0.195 3,526,698.00
Minggu 21 : (13 November s/d 23 Nov 2018)
HARGA/NILAI BOBOT PRESTASI PEKERJAAN
(Kontrak) (Kontrak) Volume Bobot
Tercapai Tercapai Nilai Yang Tagihkan

24,297,005.35 1.342 3.096 1.342 24,297,005.35


15,365,053.89 0.849 1.176 0.849 15,365,053.89
12,866,339.97 0.711 1.331 0.711 12,866,339.97
3,129,104.44 0.173 1.925 0.173 3,129,104.44

2,363,222.88 0.131 10.860 0.131 2,363,222.88


5,024,109.60 0.278 17.700 0.278 5,024,109.60
24,082,022.40 1.330 76.800 1.330 24,082,022.40
12,670,848.00 0.700 36.000 0.700 12,670,848.00
2,500,000.00 0.138 1.000 0.138 2,500,000.00
4,367,148.40 0.241 42.718 0.241 4,367,148.40
142,323,055.69 7.861 7.861 142,323,055.687

1,027,090.00 0.057 10.000 0.057 1,027,090.00


1,243,188.00 0.069 12.790 0.069 1,243,188.00
138,132.00 0.008 4.263 0.008 138,132.00
168,100.00 0.009 0.500 0.009 168,100.00
36,200.00 0.002 0.500 0.002 36,200.00
270,990.00 0.015 0.750 0.015 270,990.00

727,910.40 0.040 1.000 0.040 727,910.40


1,650,323.62 0.091 1.870 0.091 1,650,323.62
7,100,443.80 0.392 18.000 0.392 7,100,443.80
8,559,205.20 0.473 42.000 0.473 8,559,205.20
1,426,534.20 0.079 7.000 0.079 1,426,534.20
394,660.00 0.022 7.000 0.022 394,660.00
32,747,175.00 1.809 90.000 1.809 32,747,175.00

5,798,913.79 0.320 0.600 0.320 5,798,913.79


7,813,527.23 0.432 0.432 0.432 7,813,527.23
4,187,767.44 0.231 0.400 0.231 4,187,767.44
10,190,128.56 0.563 0.700 0.563 10,190,128.56
975,305.28 0.054 0.600 0.054 975,305.28

386,909.68 0.021 0.360 0.021 386,909.68


15,875,000.00 0.877 2.000 0.877 15,875,000.00
3,302,000.00 0.182 1.000 0.182 3,302,000.00
104,019,504.20 5.746 5.746 104,019,504.202

144,485.00 0.008 2.000 0.008 144,485.00


952,500.00 0.053 3.000 0.053 952,500.00
122,400.00 0.007 2.000 0.007 122,400.00
9,390,372.00 0.519 2.000 0.519 9,390,372.00
3,969,765.00 0.219 3.000 0.219 3,969,765.00
14,579,522.00 0.805 0.805 14,579,522.000
Minggu 21 : (13 November s/d 23 Nov 2018)
HARGA/NILAI BOBOT PRESTASI PEKERJAAN
(Kontrak) (Kontrak) Volume Bobot
Tercapai Tercapai Nilai Yang Tagihkan

2,924,700.00 0.162 40.000 0.162 2,924,700.00


1,507,440.00 0.083 20.000 0.083 1,507,440.00
2,515,839.10 0.139 31.000 0.139 2,515,839.10
5,426,092.10 0.300 22.000 0.300 5,426,092.10
11,336,394.95 0.626 1.000 0.626 11,336,394.95
23,710,466.15 1.310 1.310 23,710,466.151

1,500,000.000 0.083 1.000 0.083 1,500,000.00


2,500,000.000 0.138 1.000 0.138 2,500,000.00
4,000,000.000 0.221 0.221 4,000,000.000

1,810,381,483.27 100.00 #REF! #REF!


181,038,148.33 #REF!
1,991,419,631.60 #REF!
1,991,419,000.00 #REF!

OT PEKERJAAN YANG DICAPAI : #REF! %


I YANG DITAGIHKAN : #REF!
Satu Milyar Sembilan Ratus Sembilan Puluh Satu Juta Empat Ratus Sembilan Belas
Ribu Rupiah

: Disetujui Oleh : Dibuat Oleh


PEJABAT PELAKSANA TEKNIS KEGIATAN KONTRAKTOR PELAKSANA
(PPTK) PT. BUNTU RANNU

Drg. MARYEN BRAWERY, M.Kes IRWANTO TANDI ARANG


NIP. 19740117 200112 2 003 Kepala Cabang