DINAS PENGAIRAN
Jln. Ir. H. Mohd. Thaher No. 18 Telp. (0651) 21982, 21919, 24212, 22899, 3
Fax. 23686 - Email sda-aceh@yahoo.com PO Box 130 LUENG BATA - BANDA ACE
DINAS PENGAIRAN
TAHUN ANGGARAN - 2013
H A C E H
GAIRAN
21919, 24212, 22899, 33126, 21167
LUENG BATA - BANDA ACEH (23247)
HARGA
RI (HPS)
BREAKWATER SISI DEPAN
Timbunan Batu Primary Layer Timbunan Batu Primary Layer
Galian Tanah Berpasir (AB)
(3200 - 4000 kg) (1000 - 3200 kg)
JARAK
STA VOLUME VOLUME VOLUME
LUAS VULUME LUAS VULUME LUAS VULUME
KOMULATIF KOMULATIF KOMULATIF
(M) (M2) (M3) (M3) (M2) (M3) (M3) (M2) (M3) (M3)
0 103.24 0 123.73
10 0 0 0 0 1237.3 1237.3
10 103.24 0 123.73
10 0 0 0 0 1237.3 2474.6
20 103.24 0 123.73
10 0 0 0 0 1237.3 3711.9
30 107.17 0 123.73
10 0 0 0 0 1237.3 4949.2
40 107.17 0 123.73
5 0 0 0 0 618.65 5567.85
45 85.04 0 123.73
4 0 0 0 0 424.134 5991.984
49 0 0 88.34
49 0 0 5991.984
Timbunan Batu Secondary Layer Geotextile Non
Timbunan Batu Core (< 250 Kg)
(250 - 1000 Kg) Woven Terpasang
VOLUME VOLUME
LUAS VULUME LUAS VOLUME Panjang
KOMULATIF KOMULATIF
3107.64 732.26 0
REKAPITULASI
HARGA PERHITUNGAN SENDIRI (H
NO. URAIAN
A PEKERJAAN PERSIAPAN
B PEKERJAAN BREAKWATER
A Jumlah Harga I + II
B Pajak Pertambahan Nilai (PPN) = 10% (A)
C Jumlah A + B
D Dibulatkan
Terbilang : Satu Milyar Tiga Ratus Juta Rupiah
APITULASI
TUNGAN SENDIRI (HPS)
JUMLAH
20,900,000.00
1,160,886,674.00
1,181,786,674.00
118,178,667.40
1,299,965,341.40
1,300,000,000.00
Fajri
Direktur Cabang
HARGA PERHITUNGAN
NO. URAIAN
I. PEKERJAAN PERSIAPAN
1 Pengukuran (Mutual Check)
2 Mobilisasi/Demobilisasi
3 Administrasi dan Dokumentasi
4 Papan Nama Proyek
A Jumlah Harga I + II
B Pajak Pertambahan Nilai (PPN) = 10% (A)
C Jumlah A + B
D Dibulatkan
HARGA PERHITUNGAN SENDIRI (HPS)
Rp 10,000,000.00
Rp 6,900,000.00
Rp 3,000,000.00
Rp 1,000,000.00
Rp 20,900,000.00
Rp 5,675,338.18
Rp 26,026,137.60
Rp 76,613,536.42
Rp 323,575,878.78
Rp 728,995,782.94
Rp 1,160,886,674.00
1,181,786,674.00
118,178,667.40
1,299,965,341.40
1,300,000,000.00
ANALISA HARGA SATUAN PEKERJAAN
Kuantitas/
No. Uraian Satuan
Koefesien
(1) (2) (3) (4)
A Mobilisasi
1 Excavator Unit 1.0000
Sub Jumlah A
B Demobilisasi
1 Excavator Unit 1.0000
Sub Jumlah B
C Peralatan
Sub Jumlah C
D Sub Jumlah (A + B + C)
E Overhead + Profit 15% x Sub Jumlah (D)
Jumlah Harga = (D + E)
Harga Satuan Pekerjaan (Dibulatkan)
ANALISA HARGA SATUAN PEKERJAAN
Kuantitas/
No. Uraian Satuan
Koefesien
(1) (2) (3) (4)
A Tenaga Kerja
1 Pekerja Jam 0.1633
Sub Jumlah A
B Bahan
Sub Jumlah B
C Peralatan
1. Excavator Jam 0.0272
Sub Jumlah C
D Sub Jumlah (A + B + C)
E Overhead + Profit 15% x Sub Jumlah (D)
Jumlah Harga = (D + E)
Harga Satuan Pekerjaan (Dibulatkan)
ANALISA HARGA SATUAN PEKERJAAN
Kuantitas/
No. Uraian Satuan
Koefesien
(1) (2) (3) (4)
A Tenaga Kerja
1 Pekerja OH 1.1000
2 Tukang OH 0.2200
3 Mandor OH 0.1100
Sub Jumlah A
B Bahan
1. Batu Uk. 10 - 30 Kg m3 1.2500
Sub Jumlah B
C Peralatan
1. Excavator (Pasang/Susun) Jam 0.1100
Sub Jumlah C
D Sub Jumlah (A + B + C)
E Overhead + Profit 15% x Sub Jumlah (D)
Jumlah Harga = (D + E)
Harga Satuan Pekerjaan (Dibulatkan)
ANALISA HARGA SATUAN PEKERJAAN
Kuantitas/
No. Uraian Satuan
Koefesien
(1) (2) (3) (4)
A Tenaga Kerja
1 Pekerja OH 1.3500
2 Tukang OH 0.2700
3 Mandor OH 0.1350
Sub Jumlah A
B Bahan
1. Batu Uk. 650 - 800 Kg m3 1.4500
Sub Jumlah B
C Peralatan
1. Excavator (Pasang/Susun) Jam 0.1300
Sub Jumlah C
D Sub Jumlah (A + B + C)
E Overhead + Profit 15% x Sub Jumlah (D)
Jumlah Harga = (D + E)
Harga Satuan Pekerjaan (Dibulatkan)
ANALISA HARGA SATUAN PEKERJAAN
Kuantitas/
No. Uraian Satuan
Koefesien
(1) (2) (3) (4)
A Tenaga Kerja
1 Pekerja OH 1.2000
2 Tukang OH 0.2400
3 Mandor OH 0.1200
Sub Jumlah A
B Bahan
1. Batu Uk. 200 - 300 Kg m3 1.3200
Sub Jumlah B
C Peralatan
1. Excavator (Pasang/Susun) Jam 0.1200
Sub Jumlah C
D Sub Jumlah (A + B + C)
E Overhead + Profit 15% x Sub Jumlah (D)
Jumlah Harga = (D + E)
Harga Satuan Pekerjaan (Dibulatkan)
ANALISA HARGA SATUAN PEKERJAAN
Kuantitas/
No. Uraian Satuan
Koefesien
(1) (2) (3) (4)
A Tenaga Kerja
1 Pekerja OH 0.1000
2 Tukang Gali OH 0.0200
3 Mandor OH 0.0100
Sub Jumlah A
B Bahan
1. Geotextile Non Wooven m2 1.0500
Sub Jumlah B
C Peralatan
Sub Jumlah C
D Sub Jumlah (A + B + C)
E Overhead + Profit 15% x Sub Jumlah (D)
Jumlah Harga = (D + E)
Harga Satuan Pekerjaan (Dibulatkan)
ATUAN PEKERJAAN
3,000,000.00 3,000,000.00
3,000,000.00 3,000,000.00
11,429 1866.2857142857
12,857 209.5714285714
552,032.00 15,015.27
80,000.00 88,000.00
100,000.00 22,000.00
90,000.00 9,900.00
200,000.00 250,000.00
552,032.00 60,723.52
80,000.00 108,000.00
100,000.00 27,000.00
90,000.00 12,150.00
320,000.00 464,000.00
552,032.26 71,764.19
80,000.00 96,000.00
100,000.00 24,000.00
90,000.00 10,800.00
310,000.00 409,200.00
552,032.00 66,243.84
80,000.00 8,000.00
100,000.00 2,000.00
90,000 900.00
14,000.00 14,700.00
Dibulatkan
A HARGA SATUAN ALAT BERAT
0.80 M3
105.00 HP
1,300,000,000.00
5.00 Tahun
7.00 Jam
5.00 Thn 10,000.00 Jam
2,000.00
1,300,000,000.00
-
130,000,000.00
1,170,000,000.00
183,300.00
Rp/ jam 117,000.00
Rp/ jam 58,500.00
Rp/ jam 7,800.00
368,732.26
0.00
42,857.14
552,032.00
DAFTAR HARGA UPAH DAN BAHAN
NO ITEM SATUAN
A. UPAH
1 Pekerja OH
2 Tukang OH
3 Kepala Tukang OH
4 Mandor OH
5 Supir OH
6 Operator Alat Berat OH
B. BAHAN
1 Air Lt
2 Alat Bantu Set
3 Bambu Batang
4 Batu Ukuran 650 s/d 800 Kg - Material Breakwater M3
5 Batu Ukuran 200 s/d 300 Kg - Material Breakwater M3
6 Batu Ukuran 10 s/d 30 Kg - Material Breakwater M3
7 Batu Belah (Sungai/Gunung) M3
8 Batu Belah/ Kerakal M3
9 Batu Kali M3
10 Batang Kelapa M
11 Bensin (Industri) Liter
12 Besi Beton Polos Kg
13 Besi Siku 4x4 T= 4mm terpasang Meter
14 Bahan Tanah Timbun M3
15 Cat Minyak Kg
16 Cat Tembok Kg
17 Cerucuk M
18 Gemuk / Grease Kg
19 Geotextile Non Woven 400 gram M2
20 Kawat Beton Kg
21 Kawat Bronjong Pabrik uk. (2x1x0.5) dia 3.0 mm Keping
22 Kayu Perancah M3
23 Kayu Klas I (Seumantok/Ulin/dll) M3
24 Kayu Klas II (Kamper/ Kruing/ dll) M3
25 Kayu III (Borneo, dll) M3
26 Kayu klas IV (Sengon, dll) M3
27 Kerosen / Minyak Tanah Liter
28 Kuas 2" Bh
29 Minyak Cat / Thinner Liter
30 Minyak pelumas / olie Liter
31 Multipleks 3 mm Lembar
32 Multipleks 6 mm Lembar
33 Multipleks 9 mm Lembar
34 Multipleks 4 mm Lembar
35 Oli 2T Liter
36 Oli Mesin Liter
37 Oli Hidrolik Liter
38 Oli Transmisi Liter
39 Paku Seng Kg
40 Paku Kayu Kg
41 Pasir Beton/Kerikil M3
42 Pasir Pasang M3
43 Pasir Urug M3
44 Pelumas Oil Liter
45 Pipa galvanis Dia. 3" Batang
46 Pipa galvanis Dia. 2" Batang
47 Pipa galvanis Dia. 1.5" Batang
48 Pipa PVC (Drain Hole) Dia. 2.0" M
49 Semen PC (50 Kg) Zak
50 Semen @ 40 Kg Zak
51 Semen @ 50 Kg Zak
52 Solar (BO) Liter
53 Sirtu M3
54 Wayer Mess (Ulir) Dia 6.0 M
N BAHAN
JUMLAH
500
1,000
50,000
320,000
310,000
200,000
200,000
250,000
172,429
235,714
10,000
41,000
46,667
91,500
42,700
55,700
20,000
10,500
14,000
19,250
335,000
20,000
5,000,000
4,000,000
3,000,000
2,000,000
7,000
10,875
21,889
30,000
63,800
101,300
134,000
72,200
28,500
37,333
39,667
57,500
23,600
14,111
157,733
166,667
94,000
27,000
397,500
372,500
320,000
81,250
83,000
55,750
65,000
9,250
95,000
385,000
VOLUME
TAPAK
TOTAL 1547.070
kecil A == 154.71 M3
TINGGI 2
6 SPJ M
BAWAH
512.6
ATAS
0 1,300,000,00
1,299,965,341.40
TINGGI 0
0
BAWAH
480.6
1441.8
0.00
2883.6
GEOTEX
SPJ LEBAR
302.00 X 8.5
2567.00 M2
512.6
50
1,300,000,000.00
63.5
80
143.5
ANALISA HARGA SATUAN ALAT BERAT
I DATA PERALATAN
1. Jenis Peralatan = VIBRATOR ROLLER
2. Tenaga =
3. Harga = Rp
4. Umur Kerja =
5. 1 hari kerja =
6. Umur Ekonomis (Tahun) UE =
7. Jam kerja per tahun (Tahun) h =
8. Harga Pokok HP =
9. Harga Bahan Pokok/ Ban Hbp =
10. Harga Sisa (HS) = 10% (HP Hbp) =
12. Harga Penyusutan (HP - Hbp - HS) =
II BIAYA KEPEMILIKAN (OWNERSHIP) Rp/ jam
- Penyusutan D = (HP-Hbp-HS)/ (UE x h)
- Bunga Modal BM = (i= 15% ) i ((UE + 1)/ (2 UE) x (HP/ h))
- Asuransi (P = 2%) Ba = (p= 2% ) p ((UE + 1)/ (2 UE) x (HP/ h))
III BIAYA OPERASIONAL (OPERATIONAL COST)
- Biaya Bahan Bakar
BBM = ((0,8 x N x S)/ E) x Hbbm
S = (Solar) = 0.15
E = = 0.547
N = = 75.00
Hbbm = (Harga BBM) = #REF!
- Biaya Bahan Oli Pelumas
a. Mesin
BBOm = ((C/T) + (S/E)) x N x Hbop
C = = 0.1300
T = (Jam) = 250.0000
S = = 0.0005
E = = 0.547
N = = 75.0000
Hbop = (Harga bahan oli) = #REF!
b. Transmisi
BBOT = ((C/T) + (S/E)) x N x Hbop
C = = 0.2230
T = (Jam) = 1,000.0000
S = = 0.0003
E = = 0.547
N = = 75.0000
Hbop = (Harga bahan oli) = #REF!
- Biaya Bahan Hydraulik
BBH = ((C/T) + (S/E)) x N x Hbbh
C = (Vibrator) 1.290
T = (Jam) 2,000.000
S = (Vibrator) 0.00064
E = 0.547
N = 75.000
Hbbh = (Harga bahan hydraulik) #REF!
- Biaya Bahan Gemok (Grease)
BBG = (S/E) x N x Hbbg
S = (Vibrator) 0.00009
E = 0.547
N = 75.00000
Hbbg = (Harga bahan gemok) #REF!
- Biaya Saringan (filter-filter)
BFF = 0,5 (BBM+BBOM+BBOT+BBH+BBG) 0.5 x
- Biaya Bahan Pokok/ Ban
BBP = Hbp/ T
Hbp = 0.00
T = (Jam) 2,000.00
- Biaya Operator/ Jam
- Biaya Pemeliharaan/ Perbaikan (f = 90%)
BBP = f x (HP - Hbp)/ UE 90% x
Dibulatkan
A HARGA SATUAN ALAT BERAT
VIBRATOR ROLLER
75.00 HP
711,480,000.00
4.00 Tahun
7.00 Jam
4.00 Thn 8,000.00 Jam
2,000.00
711,480,000.00
20,000,000.00
69,148,000.00
622,332,000.00
115,588.88
Rp/ jam 77,791.50
Rp/ jam 33,350.63
Rp/ jam 4,446.75
#REF!
0.00
#REF!
#REF!
ANALISA HARGA SATUAN ALAT BERAT
I DATA PERALATAN
1. Jenis Peralatan = MOTOR GRADER
2. Tenaga N =
3. Harga = Rp
4. Umur Kerja =
5. 1 hari kerja =
6. Umur Ekonomis (Tahun) UE =
7. Jam kerja per tahun (Tahun) h =
8. Harga Pokok HP =
9. Harga Bahan Pokok/ Track Hbp =
10. Harga Sisa (HS) = 10% (HP Hbp) =
12. Harga Penyusutan (HP - Hbp - HS) =
II BIAYA KEPEMILIKAN (OWNERSHIP) Rp/ jam
- Penyusutan D = (HP-Hbp-HS)/ (UE x h)
- Bunga Modal Bm = (i= 15% ) i ((UE + 1)/ (2 UE) x (HP/ h))
- Asuransi (P = 2%) Ba = (p= 2% ) p ((UE + 1)/ (2 UE) x (HP/ h))
III BIAYA OPERASIONAL (OPERATIONAL COST)
- Biaya Bahan Bakar
BBM = ((0,8 x N x S)/ E) x Hbbm
S = (Solar) = 0.150
E = = 0.547
N = = -
Hbbm = (Harga BBM) = #REF!
- Biaya Bahan Oli Pelumas
a. Mesin
BBOm = ((C/T) + (S/E)) x N x Hbop
C = = 0.130
T = (Jam) = 250.00
S = = 0.0005
E = = 0.547
N = = 0.00
Hbop = (Harga bahan oli) = #REF!
b. Transmisi
BBOT = ((C/T) + (S/E)) x N x Hbop
C = = 0.223
T = (Jam) = 1,000.00
S = = 0.0003
E = = 0.547
N = = 0.00
Hbop = (Harga bahan oli) = #REF!
- Biaya Bahan Hydraulik
BBH = ((C/T) + (S/E)) x N x Hbbh
C = (Motor Garder) 0.620
T = (Jam) 2,000.00
S = (Motor Grader) 0.00030
E = 0.547
N = 0.00
Hbbh = (Harga bahan hydraulik) #REF!
- Biaya Bahan Gemok (Grease)
BBG = (S/E) x N x Hbbg
S = (Motor Grader) 0.00009
E = 0.547
N = 0.00
Hbbg = (Harga bahan gemok) #REF!
- Biaya Saringan (filter-filter)
BFF = 0,5 (BBM+BBOM+BBOT+BBH+BBG) 0.5
- Biaya Bahan Pokok/ Ban
BBP = Hbp/ T
Hbp = 0.00
T = (Jam) 2,000.00
- Biaya Operator/ Jam
- Biaya Pemeliharaan/ Perbaikan (f = 90%)
BBP = f x (HP - Hbp)/ UE 90%
Dibulatkan
A HARGA SATUAN ALAT BERAT
MOTOR GRADER
- HP
-
5.00 Tahun
7.00 Jam
5.00 Thn 10,000.00 Jam
2,000.00
-
-
-
-
-
Rp/ jam -
Rp/ jam -
Rp/ jam -
#REF!
- /jam #REF!
- /jam #REF!
- /jam #REF!
- /jam #REF!
- /jam #REF!
#REF! /jam #REF!
0.00
#REF!
- /jam -
#REF!
TABULASI JOB FA
FAKTO
N0. JENIS ALAT
ECO
1 2 3
1 Excavator 0.850
1 Excavator 0.850
1 Bulldozer 0.850
FAKTOR
EAM Em EM
4 5 6
Alat = Baik
Alat = Baik
Alat = Baik
Alat = Baik
0.805 0.800
Alat = Baik
0.805 0.800
E TOTAL
7=3x4x5x6
0.602
0.602
0.657
0.493
0.547
0.547
GROIN I (STA 0+000 - STA 0+150)
JARAK
STA VOLUME
VOLUME VOLUME
LUAS VULUME KOMULA LUAS VULUME LUAS VULUME LUAS
KOMULATIF KOMULATIF
TIF
(M) (M2) (M3) (M3) (M2) (M3) (M3) (M2) (M3) (M3) (M2)
0 95.63 53.3 24.61 40.4
50 4735 4735 2665 2665 1230.5 1230.5
50 93.77 53.3 24.61 40.4
50 3142 7877 2665 5330 1230.5 2461
100 31.91 53.3 24.61 40.4
50 1047.75 8924.75 2665 7995 1230.5 3691.5
150 10 53.3 24.61 40.4
8924.75 7995 3691.5
Geotextile Non
imbunan Batu Core (50 - 180 kg)
Woven Terpasang
VOLUME
VULUME Panjang
KOMULATIF
2020 4040
2020 6060
6060 4500
GROIN II (STA 0+000 - STA 0+150)
JARAK
STA VOLUME
VOLUME VOLUME
LUAS VULUME KOMULA LUAS VULUME LUAS VULUME LUAS
KOMULATIF KOMULATIF
TIF
(M) (M2) (M3) (M3) (M2) (M3) (M3) (M2) (M3) (M3) (M2)
0 95.7 53.3 24.61 40.4
50 4735 4735 2665 2665 1230.5 1230.5
50 93.7 53.3 24.61 40.4
50 3329.25 8064.25 2665 5330 1230.5 2461
100 39.47 53.3 24.61 40.4
50 986.75 9051 2665 7995 1230.5 3691.5
150 0 53.3 24.61 40.4
9051 7995 3691.5
Geotextile Non
mbunan Batu Core (50 - 180 kg)
Woven Terpasang
VOLUME
VULUME Panjang
KOMULATIF
2020 4040
2020 6060
6060 4500
DATA PENDUKUNG MC-100
Perhitungan Volume Galian Pondasi
0+000 15.50
0+025 15.50
0+050 15.50
0+075 15.50
0+100 15.50
0+125 15.50
0+150 15.50
0+175 15.50
0+200 15.50
0+225 15.50
0+250 15.50
0+275 15.50
0+302 15.50
Diperiksa Oleh :
Konsultan Perencana
CV. DIAMETER DESIGN KONSULTAN
RAHMAT
Inspektor
0
i
Lembar Ke : dari :
Galian Cross Position B
Luas Rata-
Jarak (M) Volume (M)
Rata
302.00
1,300,000,000.00
4806.00
0 200
150
- 200
0
0.5
PEMERINTAH KABUPATEN ACEH BARAT DA
BIDANG BINA MARGA DINAS PEKERJAAN UMUM
Jln. Komplek Perkantoran Pemerintah Kabupaten Aceh Barat Daya. Telp. (0659) 92962 Fax. (06
BLANG PIDIE - ACEH BARAT DAYA
P.0 21.00
21.00
P.1 21.00
21.00
P.2 21.00
21.00
P.3 21.00
21.00
P.4 21.00
JUMLAH HALAMAN INI
TEN ACEH BARAT DAYA
INAS PEKERJAAN UMUM
ceh Barat Daya. Telp. (0659) 92962 Fax. (0659) 92981
CEH BARAT DAYA
Hal : 1
JARAK VOLUME
KETERANGAN
(M') (M3)
25.00 525.00
25.00 525.00
23.67 497.07
0.00 0.00
1,547.07
PEMERINTAH KABUPATEN ACEH BARAT DAYA
BIDANG BINA MARGA DINAS PEKERJAAN UMUM
Jln. Komplek Perkantoran Pemerintah Kabupaten Aceh Barat Daya. Telp. (0659) 92962 Fax. (0659) 92
BLANG PIDIE - ACEH BARAT DAYA
P.0 4.00
4.00
P.1 4.00
4.00
P.2 4.00
3.75
P.3 3.50
3.70
P.4 3.90
JUMLAH
N ACEH BARAT DAYA
AS PEKERJAAN UMUM
Barat Daya. Telp. (0659) 92962 Fax. (0659) 92981
H BARAT DAYA
Hal : 1
25.00 100.00
25.00 100.00
23.67 88.76
0.00 0.00
288.76
PEMERINTAH KABUPATEN ACEH BARAT DAYA
BIDANG BINA MARGA DINAS PEKERJAAN UMUM
Jln. Komplek Perkantoran Pemerintah Kabupaten Aceh Barat Daya. Telp. (0659) 92962 Fax. (0659) 92981
BLANG PIDIE - ACEH BARAT DAYA
P.0 12.00
12.00 25.00
P.1 12.00
12.00 25.00
P.2 12.00
12.00 23.67
P.3 12.00
12.00 0.00
P.4 12.00
JUMLAH HALAMAN INI
ARAT DAYA
N UMUM
9) 92962 Fax. (0659) 92981
A
Hal : 1
VOLUME KETERANGA
(M3) N
300.00
300.00
284.04
0.00
884.04