Anda di halaman 1dari 68

P E M E R I N T A H A C E H

DINAS PENGAIRAN
Jln. Ir. H. Mohd. Thaher No. 18 Telp. (0651) 21982, 21919, 24212, 22899, 3
Fax. 23686 - Email sda-aceh@yahoo.com PO Box 130 LUENG BATA - BANDA ACE

DAFTAR KUANTITAS DAN HARGA


HARGA PERKIRAAN SENDIRI (HPS)

SKPA : DINAS PENGAIRAN


BIDANG :
KEGIATAN :
NAMA PEKERJAAN :
LOKASI :
NILAI HPS :

DINAS PENGAIRAN
TAHUN ANGGARAN - 2013
H A C E H
GAIRAN
21919, 24212, 22899, 33126, 21167
LUENG BATA - BANDA ACEH (23247)

HARGA
RI (HPS)
BREAKWATER SISI DEPAN
Timbunan Batu Primary Layer Timbunan Batu Primary Layer
Galian Tanah Berpasir (AB)
(3200 - 4000 kg) (1000 - 3200 kg)
JARAK
STA VOLUME VOLUME VOLUME
LUAS VULUME LUAS VULUME LUAS VULUME
KOMULATIF KOMULATIF KOMULATIF

(M) (M2) (M3) (M3) (M2) (M3) (M3) (M2) (M3) (M3)
0 103.24 0 123.73
10 0 0 0 0 1237.3 1237.3
10 103.24 0 123.73
10 0 0 0 0 1237.3 2474.6
20 103.24 0 123.73
10 0 0 0 0 1237.3 3711.9
30 107.17 0 123.73
10 0 0 0 0 1237.3 4949.2
40 107.17 0 123.73
5 0 0 0 0 618.65 5567.85
45 85.04 0 123.73
4 0 0 0 0 424.134 5991.984
49 0 0 88.34

49 0 0 5991.984
Timbunan Batu Secondary Layer Geotextile Non
Timbunan Batu Core (< 250 Kg)
(250 - 1000 Kg) Woven Terpasang

VOLUME VOLUME
LUAS VULUME LUAS VOLUME Panjang
KOMULATIF KOMULATIF

(M2) (M3) (M3) (M2) (M3) (M2) (M1)


66.12 15.58 0
661.2 661.2 155.8 155.8
66.12 15.58
661.2 1322.4 155.8 311.6
66.12 15.58
661.2 1983.6 155.8 467.4
66.12 15.58
661.2 2644.8 155.8 623.2
66.12 15.58
330.6 2975.4 77.9 701.1
66.12 15.58
132.24 3107.64 31.16 732.26
0 0

3107.64 732.26 0
REKAPITULASI
HARGA PERHITUNGAN SENDIRI (H

PEKERJAAN : LANJUTAN PEMBANGUNAN BATU GAJAH SINALOP KECAMATAN


LOKASI : KECAMATAN BLANGPIDIE
KABUPATEN : ACEH BARAT DAYA
TAHUN ANGGARAN : 2017

NO. URAIAN

A PEKERJAAN PERSIAPAN
B PEKERJAAN BREAKWATER

A Jumlah Harga I + II
B Pajak Pertambahan Nilai (PPN) = 10% (A)
C Jumlah A + B
D Dibulatkan
Terbilang : Satu Milyar Tiga Ratus Juta Rupiah
APITULASI
TUNGAN SENDIRI (HPS)

AH SINALOP KECAMATAN BLANGPIDIE

JUMLAH

20,900,000.00
1,160,886,674.00

1,181,786,674.00
118,178,667.40
1,299,965,341.40
1,300,000,000.00

Blangpidie, April 2017


PT.GRIYA INOPASI PROFITIA
KONSULTAN PERENCANA

Fajri
Direktur Cabang
HARGA PERHITUNGAN

PEKERJAAN : LANJUTAN PEMBANGUNAN BATU GAJAH SINALOP KECAMATAN BL


LOKASI : KECAMATAN BLANGPIDIE
KABUPATEN : ACEH BARAT DAYA
TAHUN ANGGARAN : 2017

NO. URAIAN

I. PEKERJAAN PERSIAPAN
1 Pengukuran (Mutual Check)
2 Mobilisasi/Demobilisasi
3 Administrasi dan Dokumentasi
4 Papan Nama Proyek

II. PEKERJAAN BREAKWATER


1 Galian Tanah Berpasir (AB)
2 Geotextile Non Woven Terpasang
3 Pasangan Batu Ukuran 10 - 30 Kg
4 Pasangan Batu Ukuran 200 - 300 Kg
5 Pasangan Batu Ukuran 650 - 800 Kg

A Jumlah Harga I + II
B Pajak Pertambahan Nilai (PPN) = 10% (A)
C Jumlah A + B
D Dibulatkan
HARGA PERHITUNGAN SENDIRI (HPS)

JAH SINALOP KECAMATAN BLANGPIDIE

VOLUME ANALISA HARGA SATUAN

1.00 Paket Ls Rp 10,000,000.00


1.00 Paket Dihitung Rp 6,900,000.00
1.00 Paket Ls Rp 3,000,000.00
1.00 Paket Ls Rp 1,000,000.00
SUB JUMLAH - I

288.76 m3 TM.04.a.1 Rp 19,654.00


884.04 m2 P.08 Rp 29,440.00
154.71 m3 P.14.n Rp 495,217.00
464.12 m3 P.14.r Rp 697,180.00
928.24 m3 P.14.w Rp 785,351.00
SUB JUMLAH - II
JUMLAH HARGA

Rp 10,000,000.00
Rp 6,900,000.00
Rp 3,000,000.00
Rp 1,000,000.00
Rp 20,900,000.00

Rp 5,675,338.18
Rp 26,026,137.60
Rp 76,613,536.42
Rp 323,575,878.78
Rp 728,995,782.94
Rp 1,160,886,674.00
1,181,786,674.00
118,178,667.40
1,299,965,341.40
1,300,000,000.00
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Mobilisasi/Demobilisasi


Satuan/Unit : Ls
Analisa : Taksir

Kuantitas/
No. Uraian Satuan
Koefesien
(1) (2) (3) (4)
A Mobilisasi
1 Excavator Unit 1.0000

Sub Jumlah A
B Demobilisasi
1 Excavator Unit 1.0000

Sub Jumlah B
C Peralatan

Sub Jumlah C
D Sub Jumlah (A + B + C)
E Overhead + Profit 15% x Sub Jumlah (D)
Jumlah Harga = (D + E)
Harga Satuan Pekerjaan (Dibulatkan)
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Galian Tanah Berpasir (AB)


Satuan/Unit : m3
Analisa : TM.04.a.1

Kuantitas/
No. Uraian Satuan
Koefesien
(1) (2) (3) (4)
A Tenaga Kerja
1 Pekerja Jam 0.1633

2 Mandor Jam 0.0163

Sub Jumlah A
B Bahan

Sub Jumlah B
C Peralatan
1. Excavator Jam 0.0272

Sub Jumlah C
D Sub Jumlah (A + B + C)
E Overhead + Profit 15% x Sub Jumlah (D)
Jumlah Harga = (D + E)
Harga Satuan Pekerjaan (Dibulatkan)
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pemasangan Batu Uk. 10 - 30 Kg


Satuan/Unit : m3
Analisa : P.14.n

Kuantitas/
No. Uraian Satuan
Koefesien
(1) (2) (3) (4)
A Tenaga Kerja
1 Pekerja OH 1.1000
2 Tukang OH 0.2200
3 Mandor OH 0.1100

Sub Jumlah A
B Bahan
1. Batu Uk. 10 - 30 Kg m3 1.2500

Sub Jumlah B
C Peralatan
1. Excavator (Pasang/Susun) Jam 0.1100

Sub Jumlah C
D Sub Jumlah (A + B + C)
E Overhead + Profit 15% x Sub Jumlah (D)
Jumlah Harga = (D + E)
Harga Satuan Pekerjaan (Dibulatkan)
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pemasangan Batu Uk. 650 - 800 Kg


Satuan/Unit : m3
Analisa : P.14.w

Kuantitas/
No. Uraian Satuan
Koefesien
(1) (2) (3) (4)
A Tenaga Kerja
1 Pekerja OH 1.3500
2 Tukang OH 0.2700
3 Mandor OH 0.1350

Sub Jumlah A
B Bahan
1. Batu Uk. 650 - 800 Kg m3 1.4500

Sub Jumlah B
C Peralatan
1. Excavator (Pasang/Susun) Jam 0.1300

Sub Jumlah C
D Sub Jumlah (A + B + C)
E Overhead + Profit 15% x Sub Jumlah (D)
Jumlah Harga = (D + E)
Harga Satuan Pekerjaan (Dibulatkan)
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pemasangan Batu Uk. 200 - 300 Kg


Satuan/Unit : m3
Analisa : P.14.r

Kuantitas/
No. Uraian Satuan
Koefesien
(1) (2) (3) (4)
A Tenaga Kerja
1 Pekerja OH 1.2000
2 Tukang OH 0.2400
3 Mandor OH 0.1200

Sub Jumlah A
B Bahan
1. Batu Uk. 200 - 300 Kg m3 1.3200

Sub Jumlah B
C Peralatan
1. Excavator (Pasang/Susun) Jam 0.1200

Sub Jumlah C
D Sub Jumlah (A + B + C)
E Overhead + Profit 15% x Sub Jumlah (D)
Jumlah Harga = (D + E)
Harga Satuan Pekerjaan (Dibulatkan)
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pemasangan Geotextile (Non Wooven)


Satuan/Unit : m2
Analisa : P.08

Kuantitas/
No. Uraian Satuan
Koefesien
(1) (2) (3) (4)
A Tenaga Kerja
1 Pekerja OH 0.1000
2 Tukang Gali OH 0.0200
3 Mandor OH 0.0100

Sub Jumlah A
B Bahan
1. Geotextile Non Wooven m2 1.0500

Sub Jumlah B
C Peralatan

Sub Jumlah C
D Sub Jumlah (A + B + C)
E Overhead + Profit 15% x Sub Jumlah (D)
Jumlah Harga = (D + E)
Harga Satuan Pekerjaan (Dibulatkan)
ATUAN PEKERJAAN

Harga Satuan Jumlah Harga


Dasar (Rp.) (Rp.)
(5) (6) = (4) x (5)

3,000,000.00 3,000,000.00

Sub Jumlah A 3,000,000.00

3,000,000.00 3,000,000.00

Sub Jumlah B 3,000,000.00

Sub Jumlah C 0.00


Sub Jumlah (A + B + C) 6,000,000.00
x Sub Jumlah (D) 900,000.00
Jumlah Harga = (D + E) 6,900,000.00
ga Satuan Pekerjaan (Dibulatkan) 6,900,000.00
ATUAN PEKERJAAN

Harga Satuan Jumlah Harga


Dasar (Rp.) (Rp.)
(5) (6) = (4) x (5)

11,429 1866.2857142857

12,857 209.5714285714

Sub Jumlah A 2,075.86

Sub Jumlah B 0.00

552,032.00 15,015.27

Sub Jumlah C 15,015.27


Sub Jumlah (A + B + C) 17,091.13
x Sub Jumlah (D) 2,563.67
Jumlah Harga = (D + E) 19,654.80
ga Satuan Pekerjaan (Dibulatkan) 19,654.00
ATUAN PEKERJAAN

Harga Satuan Jumlah Harga


Dasar (Rp.) (Rp.)
(5) (6) = (4) x (5)

80,000.00 88,000.00
100,000.00 22,000.00
90,000.00 9,900.00

Sub Jumlah A 119,900.00

200,000.00 250,000.00

Sub Jumlah B 250,000.00

552,032.00 60,723.52

Sub Jumlah C 60,723.52


Sub Jumlah (A + B + C) 430,623.52
x Sub Jumlah (D) 64,593.53
Jumlah Harga = (D + E) 495,217.05
ga Satuan Pekerjaan (Dibulatkan) 495,217.00
ATUAN PEKERJAAN

Harga Satuan Jumlah Harga


Dasar (Rp.) (Rp.)
(5) (6) = (4) x (5)

80,000.00 108,000.00
100,000.00 27,000.00
90,000.00 12,150.00

Sub Jumlah A 147,150.00

320,000.00 464,000.00

Sub Jumlah B 464,000.00

552,032.26 71,764.19

Sub Jumlah C 71,764.19


Sub Jumlah (A + B + C) 682,914.19
x Sub Jumlah (D) 102,437.13
Jumlah Harga = (D + E) 785,351.32
ga Satuan Pekerjaan (Dibulatkan) 785,351.00
ATUAN PEKERJAAN

Harga Satuan Jumlah Harga


Dasar (Rp.) (Rp.)
(5) (6) = (4) x (5)

80,000.00 96,000.00
100,000.00 24,000.00
90,000.00 10,800.00

Sub Jumlah A 130,800.00

310,000.00 409,200.00

Sub Jumlah B 409,200.00

552,032.00 66,243.84

Sub Jumlah C 66,243.84


Sub Jumlah (A + B + C) 606,243.84
x Sub Jumlah (D) 90,936.58
Jumlah Harga = (D + E) 697,180.42
ga Satuan Pekerjaan (Dibulatkan) 697,180.00
ATUAN PEKERJAAN

Harga Satuan Jumlah Harga


Dasar (Rp.) (Rp.)
(5) (6) = (4) x (5)

80,000.00 8,000.00
100,000.00 2,000.00
90,000 900.00

Sub Jumlah A 10,900.00

14,000.00 14,700.00

Sub Jumlah B 14,700.00

Sub Jumlah C 0.00


Sub Jumlah (A + B + C) 25,600.00
x Sub Jumlah (D) 3,840.00
Jumlah Harga = (D + E) 29,440.00
ga Satuan Pekerjaan (Dibulatkan) 29,440.00
ANALISA HARGA SATUAN ALAT BERAT
I DATA PERALATAN
1. Jenis Peralatan = EXCAVATOR
2. Tenaga =
3. Harga = Rp
4. Umur Kerja =
5. 1 hari kerja =
6. Umur Ekonomis (Tahun) UE =
7. Jam kerja per tahun (Tahun) h =
8. Harga Pokok HP =
9. Harga Bahan Pokok/ Track Hbp =
10. Harga Sisa (HS) = 10% (HP Hbp) =
12. Harga Penyusutan (HP - Hbp - HS) =
II BIAYA KEPEMILIKAN (OWNERSHIP) Rp/ jam
- Penyusutan D = (HP-Hbp-HS)/ (UE x h)
- Bunga Modal Bm = (i= 15% ) i ((UE + 1)/ (2 UE) x (HP/ h))
- Asuransi (P = 2%) Ba = (p= 2% ) p ((UE + 1)/ (2 UE) x (HP/ h))
III BIAYA OPERASIONAL (OPERATIONAL COST)
- Biaya Bahan Bakar
BBM = ((0,8 x N x S)/ E) x Hbbm
S = (Solar) = 0.100
E = = 0.602
N = = 105.00
Hbbm = (Harga BBM) = 9,250.00
- Biaya Bahan Oli Pelumas
a. Mesin
BBOm = ((C/T) + (S/E)) x N x Hbop
C = = 0.100
T = (Jam) = 250.00
S = = 0.0005
E = = 0.602
N = = 105.00
Hbop = (Harga bahan oli) = 27,000.00
b. Transmisi
BBOT = ((C/T) + (S/E)) x N x Hbop
C = = 0.200
T = (Jam) = 1,000.00
S = = 0.0003
E = = 0.602
N = = 105.00
Hbop = (Harga bahan oli) = 57,500.00
- Biaya Bahan Hydraulik
BBH = ((C/T) + (S/E)) x N x Hbbh
C = (Excavator) 2.800
T = (Jam) 2,000.00
S = (Excavator) 0.00064
E = 0.602
N = 105.00
Hbbh = (Harga bahan hydraulik) 39,666.67
- Biaya Bahan Gemok (Grease)
BBG = (S/E) x N x Hbbg
S = (Excavator) 0.00050
E = 0.602
N = 105.00
Hbbg = (Harga bahan gemok) 10,500.00
- Biaya Saringan (filter-filter)
BFF = 0,5 (BBM+BBOM+BBOT+BBH+BBG) 0.5 x
- Biaya Bahan Pokok/ Ban
BBP = Hbp/ T
Hbp = 0.00
T = (Jam) 2,000.00
- Biaya Operator/ Jam
- Biaya Pemeliharaan/ Perbaikan (f = 80%)
BBP = f x (HP - Hbp)/ UE 80% x

Harga Satuan Pekerjaan/ Jam

Dibulatkan
A HARGA SATUAN ALAT BERAT

0.80 M3
105.00 HP
1,300,000,000.00
5.00 Tahun
7.00 Jam
5.00 Thn 10,000.00 Jam
2,000.00
1,300,000,000.00
-
130,000,000.00
1,170,000,000.00
183,300.00
Rp/ jam 117,000.00
Rp/ jam 58,500.00
Rp/ jam 7,800.00
368,732.26

13.95 /jam 129,039.758

0.13 /jam 3,488.10

0.07 /jam 4,215.52

0.26 /jam 10,257.88

0.09 /jam 915.48


147,916.75 /jam 73,958.37

0.00

42,857.14

130,000.00 /jam 104,000.00

erjaan/ Jam 552,032.26

552,032.00
DAFTAR HARGA UPAH DAN BAHAN

NO ITEM SATUAN

A. UPAH
1 Pekerja OH
2 Tukang OH
3 Kepala Tukang OH
4 Mandor OH
5 Supir OH
6 Operator Alat Berat OH

B. BAHAN
1 Air Lt
2 Alat Bantu Set
3 Bambu Batang
4 Batu Ukuran 650 s/d 800 Kg - Material Breakwater M3
5 Batu Ukuran 200 s/d 300 Kg - Material Breakwater M3
6 Batu Ukuran 10 s/d 30 Kg - Material Breakwater M3
7 Batu Belah (Sungai/Gunung) M3
8 Batu Belah/ Kerakal M3
9 Batu Kali M3
10 Batang Kelapa M
11 Bensin (Industri) Liter
12 Besi Beton Polos Kg
13 Besi Siku 4x4 T= 4mm terpasang Meter
14 Bahan Tanah Timbun M3
15 Cat Minyak Kg
16 Cat Tembok Kg
17 Cerucuk M
18 Gemuk / Grease Kg
19 Geotextile Non Woven 400 gram M2
20 Kawat Beton Kg
21 Kawat Bronjong Pabrik uk. (2x1x0.5) dia 3.0 mm Keping
22 Kayu Perancah M3
23 Kayu Klas I (Seumantok/Ulin/dll) M3
24 Kayu Klas II (Kamper/ Kruing/ dll) M3
25 Kayu III (Borneo, dll) M3
26 Kayu klas IV (Sengon, dll) M3
27 Kerosen / Minyak Tanah Liter
28 Kuas 2" Bh
29 Minyak Cat / Thinner Liter
30 Minyak pelumas / olie Liter
31 Multipleks 3 mm Lembar
32 Multipleks 6 mm Lembar
33 Multipleks 9 mm Lembar
34 Multipleks 4 mm Lembar
35 Oli 2T Liter
36 Oli Mesin Liter
37 Oli Hidrolik Liter
38 Oli Transmisi Liter
39 Paku Seng Kg
40 Paku Kayu Kg
41 Pasir Beton/Kerikil M3
42 Pasir Pasang M3
43 Pasir Urug M3
44 Pelumas Oil Liter
45 Pipa galvanis Dia. 3" Batang
46 Pipa galvanis Dia. 2" Batang
47 Pipa galvanis Dia. 1.5" Batang
48 Pipa PVC (Drain Hole) Dia. 2.0" M
49 Semen PC (50 Kg) Zak
50 Semen @ 40 Kg Zak
51 Semen @ 50 Kg Zak
52 Solar (BO) Liter
53 Sirtu M3
54 Wayer Mess (Ulir) Dia 6.0 M
N BAHAN

JUMLAH

80,000 11,429 /Jam


100,000 14,286 /Jam
120,000 17,143 /Jam
90,000 12,857 /Jam
200,000 28,571 /Jam
300,000 42,857 /Jam

500
1,000
50,000
320,000
310,000
200,000
200,000
250,000
172,429
235,714
10,000
41,000
46,667
91,500
42,700
55,700
20,000
10,500
14,000
19,250
335,000
20,000
5,000,000
4,000,000
3,000,000
2,000,000
7,000
10,875
21,889
30,000
63,800
101,300
134,000
72,200
28,500
37,333
39,667
57,500
23,600
14,111
157,733
166,667
94,000
27,000
397,500
372,500
320,000
81,250
83,000
55,750
65,000
9,250
95,000
385,000
VOLUME

TAPAK

TOTAL 1547.070

kecil A == 154.71 M3

Sedang B== 464.12 M3

Besar C== 928.24 M3


ATAS

TINGGI 2

6 SPJ M
BAWAH
512.6
ATAS

0 1,300,000,00
1,299,965,341.40

TINGGI 0

0
BAWAH

480.6

1441.8
0.00
2883.6
GEOTEX
SPJ LEBAR

302.00 X 8.5

2567.00 M2

512.6
50

1,300,000,000.00

63.5
80

143.5
ANALISA HARGA SATUAN ALAT BERAT
I DATA PERALATAN
1. Jenis Peralatan = VIBRATOR ROLLER
2. Tenaga =
3. Harga = Rp
4. Umur Kerja =
5. 1 hari kerja =
6. Umur Ekonomis (Tahun) UE =
7. Jam kerja per tahun (Tahun) h =
8. Harga Pokok HP =
9. Harga Bahan Pokok/ Ban Hbp =
10. Harga Sisa (HS) = 10% (HP Hbp) =
12. Harga Penyusutan (HP - Hbp - HS) =
II BIAYA KEPEMILIKAN (OWNERSHIP) Rp/ jam
- Penyusutan D = (HP-Hbp-HS)/ (UE x h)
- Bunga Modal BM = (i= 15% ) i ((UE + 1)/ (2 UE) x (HP/ h))
- Asuransi (P = 2%) Ba = (p= 2% ) p ((UE + 1)/ (2 UE) x (HP/ h))
III BIAYA OPERASIONAL (OPERATIONAL COST)
- Biaya Bahan Bakar
BBM = ((0,8 x N x S)/ E) x Hbbm
S = (Solar) = 0.15
E = = 0.547
N = = 75.00
Hbbm = (Harga BBM) = #REF!
- Biaya Bahan Oli Pelumas
a. Mesin
BBOm = ((C/T) + (S/E)) x N x Hbop
C = = 0.1300
T = (Jam) = 250.0000
S = = 0.0005
E = = 0.547
N = = 75.0000
Hbop = (Harga bahan oli) = #REF!
b. Transmisi
BBOT = ((C/T) + (S/E)) x N x Hbop
C = = 0.2230
T = (Jam) = 1,000.0000
S = = 0.0003
E = = 0.547
N = = 75.0000
Hbop = (Harga bahan oli) = #REF!
- Biaya Bahan Hydraulik
BBH = ((C/T) + (S/E)) x N x Hbbh
C = (Vibrator) 1.290
T = (Jam) 2,000.000
S = (Vibrator) 0.00064
E = 0.547
N = 75.000
Hbbh = (Harga bahan hydraulik) #REF!
- Biaya Bahan Gemok (Grease)
BBG = (S/E) x N x Hbbg
S = (Vibrator) 0.00009
E = 0.547
N = 75.00000
Hbbg = (Harga bahan gemok) #REF!
- Biaya Saringan (filter-filter)
BFF = 0,5 (BBM+BBOM+BBOT+BBH+BBG) 0.5 x
- Biaya Bahan Pokok/ Ban
BBP = Hbp/ T
Hbp = 0.00
T = (Jam) 2,000.00
- Biaya Operator/ Jam
- Biaya Pemeliharaan/ Perbaikan (f = 90%)
BBP = f x (HP - Hbp)/ UE 90% x

Harga Satuan Pekerjaan/ Jam

Dibulatkan
A HARGA SATUAN ALAT BERAT

VIBRATOR ROLLER
75.00 HP
711,480,000.00
4.00 Tahun
7.00 Jam
4.00 Thn 8,000.00 Jam
2,000.00
711,480,000.00
20,000,000.00
69,148,000.00
622,332,000.00
115,588.88
Rp/ jam 77,791.50
Rp/ jam 33,350.63
Rp/ jam 4,446.75
#REF!

16.44 /jam #REF!

0.11 /jam #REF!

0.06 /jam #REF!

0.14 /jam #REF!


0.01 /jam #REF!

#REF! /jam #REF!

0.00

#REF!

86,435.00 /jam 77,791.50

kerjaan/ Jam #REF!

#REF!
ANALISA HARGA SATUAN ALAT BERAT
I DATA PERALATAN
1. Jenis Peralatan = MOTOR GRADER
2. Tenaga N =
3. Harga = Rp
4. Umur Kerja =
5. 1 hari kerja =
6. Umur Ekonomis (Tahun) UE =
7. Jam kerja per tahun (Tahun) h =
8. Harga Pokok HP =
9. Harga Bahan Pokok/ Track Hbp =
10. Harga Sisa (HS) = 10% (HP Hbp) =
12. Harga Penyusutan (HP - Hbp - HS) =
II BIAYA KEPEMILIKAN (OWNERSHIP) Rp/ jam
- Penyusutan D = (HP-Hbp-HS)/ (UE x h)
- Bunga Modal Bm = (i= 15% ) i ((UE + 1)/ (2 UE) x (HP/ h))
- Asuransi (P = 2%) Ba = (p= 2% ) p ((UE + 1)/ (2 UE) x (HP/ h))
III BIAYA OPERASIONAL (OPERATIONAL COST)
- Biaya Bahan Bakar
BBM = ((0,8 x N x S)/ E) x Hbbm
S = (Solar) = 0.150
E = = 0.547
N = = -
Hbbm = (Harga BBM) = #REF!
- Biaya Bahan Oli Pelumas
a. Mesin
BBOm = ((C/T) + (S/E)) x N x Hbop
C = = 0.130
T = (Jam) = 250.00
S = = 0.0005
E = = 0.547
N = = 0.00
Hbop = (Harga bahan oli) = #REF!
b. Transmisi
BBOT = ((C/T) + (S/E)) x N x Hbop
C = = 0.223
T = (Jam) = 1,000.00
S = = 0.0003
E = = 0.547
N = = 0.00
Hbop = (Harga bahan oli) = #REF!
- Biaya Bahan Hydraulik
BBH = ((C/T) + (S/E)) x N x Hbbh
C = (Motor Garder) 0.620
T = (Jam) 2,000.00
S = (Motor Grader) 0.00030
E = 0.547
N = 0.00
Hbbh = (Harga bahan hydraulik) #REF!
- Biaya Bahan Gemok (Grease)
BBG = (S/E) x N x Hbbg
S = (Motor Grader) 0.00009
E = 0.547
N = 0.00
Hbbg = (Harga bahan gemok) #REF!
- Biaya Saringan (filter-filter)
BFF = 0,5 (BBM+BBOM+BBOT+BBH+BBG) 0.5
- Biaya Bahan Pokok/ Ban
BBP = Hbp/ T
Hbp = 0.00
T = (Jam) 2,000.00
- Biaya Operator/ Jam
- Biaya Pemeliharaan/ Perbaikan (f = 90%)
BBP = f x (HP - Hbp)/ UE 90%

Harga Satuan Pekerjaan/ Jam

Dibulatkan
A HARGA SATUAN ALAT BERAT

MOTOR GRADER
- HP
-
5.00 Tahun
7.00 Jam
5.00 Thn 10,000.00 Jam
2,000.00
-
-
-
-
-
Rp/ jam -
Rp/ jam -
Rp/ jam -
#REF!

- /jam #REF!

- /jam #REF!

- /jam #REF!

- /jam #REF!

- /jam #REF!
#REF! /jam #REF!

0.00

#REF!

- /jam -

erjaan/ Jam #REF!

#REF!
TABULASI JOB FA

FAKTO
N0. JENIS ALAT
ECO
1 2 3

Cuaca = Terang, Segar


PEKERJAAN GALIAN
Operator = Baik

1 Excavator 0.850

PEKERJAAN MENYUSUN Cuaca = Terang, Segar


BATU
Operator = Baik

1 Excavator 0.850

PEKERJAAN Cuaca = Terang, Segar


MENGANGKUT
MATERIAL Operator = Baik

1 Dump Truck 0.850

PEKERJAAN Cuaca = Terang, Segar


MEMADATKAN
MATERIAL Operator = Baik

1 Bulldozer 0.850

2 Vibrator Roller 0.850

PEKERJAAN MERATAKAN Cuaca = Terang, Segar


MATERIAL
Operator = Baik

1 Motor Grader 0.850


TABULASI JOB FAKTOR ( E )

FAKTOR

EAM Em EM
4 5 6

Medan = Sedang Material = Sedang Manajemen = Sedang

Alat = Baik

0.805 1.100 0.800

Medan = Sedang Material = Sedang Manajemen = Sedang

Alat = Baik

0.805 1.100 0.800

Medan = Sedang Material = Sedang Manajemen = Sedang

Alat = Baik

0.805 1.200 0.800

Medan = Sedang Material = Sedang Manajemen = Sedang

Alat = Baik

0.805 0.900 0.800

0.805 0.800

Medan = Sedang Material = Sedang Manajemen = Sedang

Alat = Baik

0.805 0.800
E TOTAL

7=3x4x5x6

0.602

0.602

0.657

0.493

0.547

0.547
GROIN I (STA 0+000 - STA 0+150)

Timbunan Batu Primary Layer Timbunan Batu Secondary Layer


Galian Tanah Berpasir (AB) Timbunan Batu Core (50
(1500 - 2500 kg) (150 - 250 kg)

JARAK
STA VOLUME
VOLUME VOLUME
LUAS VULUME KOMULA LUAS VULUME LUAS VULUME LUAS
KOMULATIF KOMULATIF
TIF

(M) (M2) (M3) (M3) (M2) (M3) (M3) (M2) (M3) (M3) (M2)
0 95.63 53.3 24.61 40.4
50 4735 4735 2665 2665 1230.5 1230.5
50 93.77 53.3 24.61 40.4
50 3142 7877 2665 5330 1230.5 2461
100 31.91 53.3 24.61 40.4
50 1047.75 8924.75 2665 7995 1230.5 3691.5
150 10 53.3 24.61 40.4
8924.75 7995 3691.5
Geotextile Non
imbunan Batu Core (50 - 180 kg)
Woven Terpasang

VOLUME
VULUME Panjang
KOMULATIF

(M3) (M3) (M1)


30
2020 2020

2020 4040

2020 6060

6060 4500
GROIN II (STA 0+000 - STA 0+150)

Timbunan Batu Primary Layer Timbunan Batu Secondary Layer


Galian Tanah Berpasir (AB) Timbunan Batu Core (50 - 1
(1500 - 2500 kg) (150 - 250 kg)

JARAK
STA VOLUME
VOLUME VOLUME
LUAS VULUME KOMULA LUAS VULUME LUAS VULUME LUAS
KOMULATIF KOMULATIF
TIF

(M) (M2) (M3) (M3) (M2) (M3) (M3) (M2) (M3) (M3) (M2)
0 95.7 53.3 24.61 40.4
50 4735 4735 2665 2665 1230.5 1230.5
50 93.7 53.3 24.61 40.4
50 3329.25 8064.25 2665 5330 1230.5 2461
100 39.47 53.3 24.61 40.4
50 986.75 9051 2665 7995 1230.5 3691.5
150 0 53.3 24.61 40.4
9051 7995 3691.5
Geotextile Non
mbunan Batu Core (50 - 180 kg)
Woven Terpasang

VOLUME
VULUME Panjang
KOMULATIF

(M3) (M3) (M1)


30
2020 2020

2020 4040

2020 6060

6060 4500
DATA PENDUKUNG MC-100
Perhitungan Volume Galian Pondasi

Galian Cross Position A Galian Cross


No Luas Rata- No
Luas (M) Jarak (M) Volume (M) Luas (M)
Rata

GALIAN PONDASI SPJ. 96 METER. GALIAN PONDASI SPJ. 50

0+000 15.50

0+025 15.50

0+050 15.50

0+075 15.50

0+100 15.50

0+125 15.50

0+150 15.50

0+175 15.50

0+200 15.50

0+225 15.50

0+250 15.50

0+275 15.50

0+302 15.50
Diperiksa Oleh :
Konsultan Perencana
CV. DIAMETER DESIGN KONSULTAN

RAHMAT
Inspektor
0
i

Lembar Ke : dari :
Galian Cross Position B
Luas Rata-
Jarak (M) Volume (M)
Rata

ALIAN PONDASI SPJ. 50 METER.

15.50 25.00 387.50

15.50 25.00 387.50


25
15.50 25.00 387.50

15.50 25.00 387.50

15.50 25.00 387.50

15.50 25.00 387.50


rahwadi
18.00 25.00 450.00 19680712 199603 1 004

18.00 25.00 450.00


mulyadi
15.50 25.00 387.50 19671021 199803 1 002

15.50 25.00 387.50

15.50 25.00 387.50


787.585
15.50 27.00 418.50 -

302.00
1,300,000,000.00
4806.00

0 200
150
- 200
0

0.5
PEMERINTAH KABUPATEN ACEH BARAT DA
BIDANG BINA MARGA DINAS PEKERJAAN UMUM
Jln. Komplek Perkantoran Pemerintah Kabupaten Aceh Barat Daya. Telp. (0659) 92962 Fax. (06
BLANG PIDIE - ACEH BARAT DAYA

KONSULTAN : PT.GRIYA INOVASI PROFITIA


JENIS PEKERJAAN : PASANGAN BATU

LUAS LUAS RATA2


No. STA/PATOK
(M2) (M')

P.0 21.00
21.00
P.1 21.00
21.00
P.2 21.00
21.00
P.3 21.00
21.00
P.4 21.00
JUMLAH HALAMAN INI
TEN ACEH BARAT DAYA
INAS PEKERJAAN UMUM
ceh Barat Daya. Telp. (0659) 92962 Fax. (0659) 92981
CEH BARAT DAYA

Hal : 1

JARAK VOLUME
KETERANGAN
(M') (M3)

25.00 525.00
25.00 525.00

23.67 497.07

0.00 0.00
1,547.07
PEMERINTAH KABUPATEN ACEH BARAT DAYA
BIDANG BINA MARGA DINAS PEKERJAAN UMUM
Jln. Komplek Perkantoran Pemerintah Kabupaten Aceh Barat Daya. Telp. (0659) 92962 Fax. (0659) 92
BLANG PIDIE - ACEH BARAT DAYA

KONSULTAN : PT.GRIYA INOVASI PROFITIA


JENIS PEKERJAAN : GALIAN TANAH

LUAS LUAS RATA2


No. STA/PATOK
(M2) (M')

P.0 4.00
4.00
P.1 4.00
4.00
P.2 4.00
3.75
P.3 3.50
3.70
P.4 3.90
JUMLAH
N ACEH BARAT DAYA
AS PEKERJAAN UMUM
Barat Daya. Telp. (0659) 92962 Fax. (0659) 92981
H BARAT DAYA

Hal : 1

JARAK VOLUME KETERANGA


(M') (M3) N

25.00 100.00
25.00 100.00

23.67 88.76

0.00 0.00
288.76
PEMERINTAH KABUPATEN ACEH BARAT DAYA
BIDANG BINA MARGA DINAS PEKERJAAN UMUM
Jln. Komplek Perkantoran Pemerintah Kabupaten Aceh Barat Daya. Telp. (0659) 92962 Fax. (0659) 92981
BLANG PIDIE - ACEH BARAT DAYA

KONSULTAN : PT.GRIYA INOVASI PROFITIA


JENIS PEKERJAAN : GEOTEX

LUAS LUAS RATA2 JARAK


No. STA/PATOK
(M2) (M') (M')

P.0 12.00
12.00 25.00
P.1 12.00
12.00 25.00
P.2 12.00
12.00 23.67
P.3 12.00
12.00 0.00
P.4 12.00
JUMLAH HALAMAN INI
ARAT DAYA
N UMUM
9) 92962 Fax. (0659) 92981
A

Hal : 1

VOLUME KETERANGA
(M3) N

300.00
300.00

284.04

0.00
884.04