C. TOTAL Rp 154,363,325.22
D. DIBULATKAN Rp 154,360,000.00
SERATUS LIMA PULUH EMPAT JUTA TIGA RATUS ENAM PULUH RIBU RUPIAH
1 2 3 4 5 6
A PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 900.00 M2 Rp 5,137.00 Rp 4,623,300.00
2 Pek. Scafolding 40.00 Set Rp 180,000.00 Rp 7,200,000.00
3 Pek. Kesehatan dan Keselamatan Kerja K3
Kotak P3K Full Set (Lengkap) 1.00 Set Rp 200,000.00 Rp 200,000.00
Topi Pelindung (Safety Helmet) 4.00 Bh Rp 40,000.00 Rp 160,000.00
Pelindung Pernafasan Dan Mulut (Masker) 1.00 Dus Rp 50,000.00 Rp 50,000.00
Sepatu Karet Keselamatan (AP Boot) 4.00 Bh Rp 150,000.00 Rp 600,000.00
Sarung Tangan (Safety Gloves) 4.00 Bh Rp 20,000.00 Rp 80,000.00
Rp 12,913,300.00
B PEKERJAAN PINTU DAN PENUTUP DINDING
1 Pek. Pintu Kaca Almunium + Smart Lock 1.00 Unit Rp 6,440,810.14 Rp 6,440,810.14
2 Pek. Pas. Dinding 1/2 Bata 51.50 M2 Rp 197,076.16 Rp 10,149,422.50
3 Pek. Plesteran Dinding 1 Pc : 5 Ps, tebal 15 mm 103.00 M2 Rp 73,467.70 Rp 7,567,173.31
4 Pek. Acian Dinding Dan Beton 103.00 M2 Rp 67,172.88 Rp 6,918,806.13
5 Pek. Balok Latei Atas Kusen 2.10 M Rp 125,000.00 Rp 262,500.00
Rp 31,338,712.06
C PEKERJAAN PENUTUP LANTAI
1 Pek. Lantai Granit Un-polish 60x60 71.25 M2 Rp 430,001.22 Rp 30,637,586.93
Rp 30,637,586.93
E PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding (Eks - Nippon/Jotun) 1472.45 M2 Rp 36,783.67 Rp 54,162,114.89
2 Pek. Pengecatan Besi 145.10 M2 Rp 54,969.75 Rp 7,975,835.88
Rp 62,137,950.77
Harga Satuan
Jumlah
No Kebutuhan Satuan Indeks Upah/Bahan
(Rp.) (Rp.)
PEKERJAAN PENGECATAN
1 1 M2 Cat Tembok/Plafond Interior
Cat Tembok Kg 0.100 Rp 42,252.00 Rp ###
4,225.20
BAHAN
Cat Tembok ( Penutup 2x) Kg 0.360 Rp 50,500.00 Rp ###
18,180.00
Pekerja Oh 0.020 Rp 114,000.00 Rp ###
2,280.00
Tukang Oh 0.063 Rp 120,000.00 Rp ###
7,560.00
UPAH
Kepala Tukang Oh 0.0063 Rp 140,000.00 Rp ###
882.00
Mandor Oh 0.0025 Rp 125,000.00 Rp ###
312.50
Jumlah Rp ###
33,439.70
Profit 10 % 3,343.97
###
Total 36,783.67
###
Harga Satuan
Jumlah
No Kebutuhan Satuan Indeks Upah/Bahan
(Rp.) (Rp.)
2 1 M2 Cat Besi Duco
Minyak Cat Ltr 0.200 20,000.00 Rp 4,000.00
Meni Besi Kg 0.150 20,000.00 Rp 3,000.00
BAHAN Cat Besi Kg 0.170 60,000.00 Rp 10,200.00
Cat Besi ( Penutup 2x) Kg 0.340 60,000.00 Rp 20,400.00
Jumlah Rp 34,867,065.00
Total 34,867,065.00
Jumlah Rp 215,000.00
Profit 10 % 21,500.00
Total 236,500.00
V. PEKERJAAN K3
1 KESEHATAN DAN KESELAMATAN KERJA
Kotak P3K Bh 1.000 Rp 75,000.00 Rp 75,000.00
Topi Pelindung (Safety Helmet) Bh 1.000 Rp 400,000.00 Rp 400,000.00
BAHAN Pelindung Pernafasan Dan Mulut Bh 4.000 Rp 40,000.00 Rp 160,000.00
Sepatu Karet Keselamatan Bh 4.000 Rp 2,500.00 Rp 10,000.00
Sarung Tangan (Safety Gloves) Bh 4.000 Rp 75,000.00 Rp 300,000.00
UPAH
Jumlah Rp 945,000.00
Profit 10 % 94,500.00
Total 1,039,500.00
32 A.4.2.1.11. Pemasangan 1 M1 Kusen Pintu Alluminium
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.043 114,000.00
Tukang Khusus Alumunium L.03 OH 0.043 120,000.00
Kepala tukang L.03 OH 0.004 140,000.00
Mandor L.04 OH 0.002 125,000.00
JUMLAH TENAGA KERJA
B BAHAN
Profil Aluminium 4" x 1,3/4' Coklat M1 1.100 75,500.00
Skrup fixer Buah 0.200 27,500.00
Sealant Tube 0.060 70,000.00
JUMLAH HARGA BAHAN
C PERALATAN
-
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 10% x D
F Harga Satuan Pekerjaan (D+E)
4,902.00
5,160.00
602.00
262.50
10,926.50
83,050.00
5,500.00
4,200.00
92,750.00
-
-
103,676.50
10,367.65
114,044.15
3,676.50
5,104.10
612.75
249.27
9,642.62
193,930.00
8,800.00
1,392.00
204,122.00
-
-
213,764.62
21,376.46
235,141.08
1,500,000.00
1,500,000.00
4,960,920.52
3,300,000.00
522,000.00
990,000.00
9,772,920.52
-
-
11,272,920.52
1,127,292.05
12,400,212.58
800,000.00
800,000.00
624,961.94
243,800.00
255,000.00
3,000,000.00
350,000.00
450,000.00
131,520.00
5,055,281.94
-
-
5,855,281.94
585,528.19
6,440,810.14
34,200.00
36,000.00
4,200.00
1,875.00
76,275.00
41,860.00
1,350.00
43,210.00
-
-
119,485.00
11,948.50
131,433.50
11,400.00
6,000.00
700.00
625.00
18,725.00
132,860.00
2,750.00
135,610.00
-
-
154,335.00
15,433.50
169,768.50
29,640.00
15,600.00
1,820.00
1,625.00
48,685.00
226,732.85
13,832.20
6,325.00
7,068.00
253,958.05
-
-
302,643.05
30,264.31
332,907.36
Harga Satuan Upah Dan Bahan
Pekerjaan : Err:509
Lokasi : Err:509
Tahun Anggaran : Err:509
I. Upah Kerja
1 Pekerja Oh Rp 114,000.00
2 Tukang Batu/Kayu/Besi/Cat/Las Oh Rp 120,000.00
3 Kepala Tukang Oh Rp 140,000.00
4 Mandor Oh Rp 125,000.00
II. Bahan-Bahan
1 Pasir Urug Kg Rp 100,000.00 65,000.00
2 Pasir Beton M3 Rp 100,000.00
3 Pasir Pasang M3 Rp 100,000.00
4 Cat Tembok Kg Rp 55,000.00
5 Cat Kayu/Besi Kg Rp 60,000.00 65,000.00
6 Plamur Kg Rp 35,000.00 58,000.00
7 Minyak Cat Ltr Rp 20,000.00
8 Kayu Kelas III M3 Rp 1,600,000.00
9 Paku Biasa 5 cm - 12 cm Kg Rp 20,000.00
10 Minyak Bekesting Lt Rp 5,000.00
11 Balok Kayu Daerah M3 Rp 1,600,000.00
12 Balok Kayu Daerah Btg Rp 50,000.00
13 Plywood Tebal 9 mm Lbr Rp 135,000.00
14 Kayu Balok Btg Rp 20,000.00
15 Besi Beton Kg Rp 11,000.00
16 Kawat Beton Kg Rp 21,000.00
17 Semen Portland Kg Rp 1,300.00
18 Angkur Baut ø 25 x 1000 (Terpasang) Bh Rp 75,000.00
19 Pipa Besi ø 12" M' Rp 3,200,000.00
20 Pipa Besi ø 2" M' Rp 155,000.00
21 Pipa Besi ø 1 1/2" M' Rp 85,000.00
22 Besi Hollow 40 x 40 x 1,5mm M' Rp 35,000.00
23 Meni Besi Kg Rp 20,000.00
24 Kawat Las Kg Rp 40,000.00
25 Plat 18 mm Kg Rp 8,000.00
26 Kaca 6mm m2 Rp 250,000.00
27 Alumunium Composite Panel Lembar Rp 950,000.00
28 Hollow 4 x 4 cm Galvanis Btg Rp 130,000.00
29 Profil Almunium M' Rp 75,000.00
No. Jenis Upah / Bahan Satuan Harga Satuan Keterangan
1 2 3 4 5
III. Peralatan
1 Stager Scafolding Set/Bln Rp 180,000.00
45,500.00