No URAIAN PEKERJAAN SAT. VOLUME HARGA

1 2 3 4 5

A PEKERJAAN PERSIAPAN Rp 5,006,693.69

B PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI DAN PIPA DISTRIBUSI BAK RESERVOIR
B 1 PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI Pipa GIP Ø 40 mm Beserta Aksesories M' 24.00 Rp 5,015,807.93

C PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI , PIPA DISTRIBUSI DAN PIPA RING
C 1 PEKERJAAN PENGADAAN DAN PEMASANGAN Pipa Polyethelene (HDPE) Ø 63 mm M' 224.92 Rp 21,494,220.88
C 2 PEKERJAAN PENGADAAN DAN PEMASANGAN Pipa Polyethelene (HDPE) Ø 50 mm M' 1,303.65 Rp 87,165,953.44
C 3 PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA RING Pipa Polyethelene (HDPE) Ø 32 mm M' 1,625.83 Rp 56,509,036.90

D PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA SR


D 1 PEKERJAAN PENGADAAN DAN PEMASANGAN Sambungan Rumah Beserta Aksesories UNIT 123.00 Rp 110,236,972.51
D 2 PEKERJAAN PENGADAAN DAN PEMASANGAN Pipa Polyethelene (HDPE) Ø 20 mm Beserta Aksesories M' 1,428.00 Rp 30,090,731.72
D 3 PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA GIP. Ø 15 mm Berserta Aksesories M' 40.45 Rp 3,033,950.97

E PEKERJAAN PAS. GATE VALVE Bh 7.00 Rp 4,901,638.53

F PEKERJAAN PENYELESAIAN Rp 6,400,000.00

Jumlah Rp 329,855,006.58
PPn 11 % Rp 36,284,050.72
Jumlah Total Rp 366,139,057.30
Dibulatkan Rp 366,139,000.00

Terbilang : TIGA RATUS ENAM PULUH ENAM JUTA SERATUS TIGA PULUH SEMBILAN RIBU RUPIAH

Larantuka, 08 / Juni /2023


PENAWAR
CV. DEF INDAH

LODOFIKUS SILVERIUS UHE KOTEN


Kuasa Direktur
RENCANA ANGGARAN BIAYA (RAB)
PENGEOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
PROGRAM :
PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
KEGIATAN :
PEKERJAAN : PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA RATULODONG
LOKASI : DESA RATULODONG - KEC. TANJUNG BUNGA- KAB. FLORES TIMUR
TAHUN ANGGARAN : 2023

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN SATUAN VOLUME
(Rp.) (Rp.)

1 2 3 4 5 6
A PEKERJAAN PERSIAPAN
- Pengukuran Dan Pembersihan Lokasi Ls 1.00 Rp 1,000,000.00 Rp 1,000,000.00
- Papan Nama Proyek Ls 1.00 Rp 300,000.00 Rp 300,000.00
- Mobilisasi dan Demobilisasi Ls 1.00 Rp 1,000,000.00 Rp 1,000,000.00
- Alat Pelindung Diri dan Keselamatan Kerja (APD K3)
- Helm Pengaman Pekerja Bh 6.00 Rp 124,000.00 Rp 744,000.00
- Sarung Tangan Psg 6.00 Rp 17,115.62 Rp 102,693.69
- Sepatu Boots Panjang Psg 6.00 Rp 250,000.00 Rp 1,500,000.00
- Rompi Pekerja Bh 6.00 Rp 60,000.00 Rp 360,000.00
TOTAL PEKERJAAN A Rp 5,006,693.69
B PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI DAN PIPA DISTRIBUSI BAK RESERVOIR
B1 PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI Pipa GIP Ø 40 mm Beserta Aksesories
Pipa Transmisi
I Pengadaan Dan Pemasangan Pipa GIP Ø 40 mm Beserta Aksesories
- Pipa GIP 1 1/2" M' 6.00 Rp 182,402.62 Rp 1,094,415.73
- Socket GIP Ø 1 1/2" Bh 1.00 Rp 29,510.00 Rp 29,510.00
- Double Nipple GIP. 1 1/2" Bh 1.00 Rp 36,790.00 Rp 36,790.00
- Water Moor GIP. 1 1/2" Bh 1.00 Rp 87,230.00 Rp 87,230.00
- Knie GIP 1 1/2" Bh 3.00 Rp 39,650.00 Rp 118,950.00
Sub Jumlah Rp 1,366,895.73
Outlet Bak Reservoar Kedua
II Pengadaan Dan Pemasangan Pipa GIP Ø 40 mm Beserta Aksesories
- Pipa GIP 1 1/2" M' 18.00 Rp 182,402.62 Rp 3,283,247.19
- Tee All SoCket GIP. Ǿ 40 x 40 x 25 mm Bh 1.00 Rp 73,815.00 Rp 73,815.00
- Socket GIP Ø 1 1/2" Bh 3.00 Rp 29,510.00 Rp 88,530.00
- Double Nipple GIP. 1 1/2" Bh 1.00 Rp 36,790.00 Rp 36,790.00
- Water Moor GIP. 1 1/2" Bh 1.00 Rp 87,230.00 Rp 87,230.00
- Knie GIP 1 1/2" Bh 2.00 Rp 39,650.00 Rp 79,300.00
Sub Jumlah Rp 3,648,912.19
Total Pekerjaan B 1 Rp 5,015,807.93
TOTAL PEKERJAAN B Rp 5,015,807.93
C PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA TRANSMISI , PIPA DISTRIBUSI DAN PIPA RING
C1 PEKERJAAN PENGADAAN DAN PEMASANGAN Pipa Polyethelene (HDPE) Ø 63 mm
Pipa Transmisi
I Pengadaan Dan Pemasangan Pipa Polyethelene (HDPE) Ø 63 mm Beserta Aksesories
- Pipa Polyethelene (HDPE) Ø63 mm PN 16 M' 224.92 Rp 87,226.73 Rp 19,618,773.54
- Straight Coupler HDPE Ø 63 PN 16 Bh 2.00 Rp 131,986.14 Rp 263,972.29
- Male Thread Joint HDPE Ø 63mm PN 16 Bh 1.00 Rp 72,583.59 Rp 72,583.59
- Femalee Thread Joint HDPE Ø 63mm PN 16 Bh 1.00 Rp 95,254.98 Rp 95,254.98
- Tee Equal HDPE Ø 63 X 63 X 63 PN 16 Bh 1.00 Rp 222,320.20 Rp 222,320.20
- Elbow HDPE Ø 63 mm - 90˚ PN 16 Bh 7.00 Rp 149,736.61 Rp 1,048,156.27
- Tee GIP. Ǿ 50 x 50 x 50 mm Bh 1.00 Rp 173,160.00 Rp 173,160.00
Sub Jumlah Rp 21,494,220.88
Total Pekerjaan C 1 Rp 21,494,220.88
C2 PEKERJAAN PENGADAAN DAN PEMASANGAN Pipa Polyethelene (HDPE) Ø 50 mm
Area 1
I Pengadaan Dan Pemasangan Pipa Polyethelene (HDPE) Ø 50 mm Beserta Aksesories
- Pipa Polyethelene (HDPE) Ø 50 mm PN 16 M' 610.62 Rp 59,020.26 Rp 36,038,950.77
- Straight Coupler HDPE Ø 50 PN 16 Bh 6.00 Rp 83,304.17 Rp 499,825.02
- Female Thread Joint HDPE Ø 50 mm PN 16 Bh 1.00 Rp 61,687.27 Rp 61,687.27
- Elbow HDPE Ø 50 mm - 90˚ PN 16 Bh 8.00 Rp 94,376.24 Rp 755,009.95
- End Cap Ø 50 mm PN 16 Bh 1.00 Rp 45,518.52 Rp 45,518.52
Sub Jumlah Rp 37,400,991.54
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN VOLUME
(Rp.) (Rp.)
1 2 3 4 5 6
Area 2
II Pengadaan Dan Pemasangan Pipa Polyethelene (HDPE) Ø 50 mm Beserta Aksesories
- Pipa Polyethelene (HDPE) Ø 50 mm M' 603.46 Rp 59,020.26 Rp 35,616,129.64
- Straight Coupler HDPE Ø 50 Bh 6.00 Rp 83,304.17 Rp 499,825.02
- Male Thread Joint HDPE Ø 50 mm Bh 6.00 Rp 51,669.68 Rp 310,018.05
- Elbow HDPE Ø 50 mm - 90˚ Bh 8.00 Rp 94,376.24 Rp 755,009.95
- End Cap Ø 50 mm PN 16 Bh 5.00 Rp 45,518.52 Rp 227,592.62
- Tee GIP. Ǿ 40 x 40 x 40 mm Bh 4.00 Rp 73,815.00 Rp 295,260.00
- Double Nipple GIP. 1 1/2" Bh 4.00 Rp 36,790.00 Rp 147,160.00
- Water Moor GIP. 1 1/2" Bh 4.00 Rp 87,230.00 Rp 348,920.00
Sub Jumlah Rp 38,199,915.28
Area 3
III Pengadaan Dan Pemasangan Pipa Polyethelene (HDPE) Ø 50 mm Beserta Aksesories
- Pipa Polyethelene (HDPE) Ø 50 mm M' 89.58 Rp 59,020.26 Rp 5,286,751.54
- Straight Coupler HDPE Ø 50 Bh 1.00 Rp 83,304.17 Rp 83,304.17
- Male Thread Joint HDPE Ø 50 mm Bh 1.00 Rp 51,669.68 Rp 51,669.68
- Elbow HDPE Ø 50 mm - 90˚ Bh 1.00 Rp 94,376.24 Rp 94,376.24
- End Cap Ø 50 mm PN 16 Bh 1.00 Rp 45,518.52 Rp 45,518.52
- Tee All Socket GIP. Ǿ 40 x 40 x 25 mm Bh 1.00 Rp 73,815.00 Rp 73,815.00
- Double Nipple GIP. 1 1/2" Bh 1.00 Rp 83,304.17 Rp 83,304.17
- Water Moor GIP. 1 1/2" Bh 1.00 Rp 61,687.27 Rp 61,687.27
Sub Jumlah Rp 5,780,426.59
IV Kontruksi Galian Pemasangan Pipa HDPE Ø 50 mm
- Galian Tanah Biasa M3 35.20 Rp 60,500.00 Rp 2,129,514.24
- Urugan Tanah Bekas Galian M3 35.13 Rp 44,000.00 Rp 1,545,640.15
- Galian Tanah Keras M3 7.04 Rp 80,520.00 Rp 566,837.97
- Urugan Tanah Bekas Galian M3 6.97 Rp 44,000.00 Rp 306,656.24
Sub Jumlah Rp 4,548,648.60

V Pekerjaan Crossing Jalan Perkerasan (4 Titik)


- Galian Tanah Cadas/Aspal/Beton M3 0.54 Rp 122,100.00 Rp 65,934.00
- Beton mutu f’c = 14,5 MPa (K 175) M3 0.24 Rp 1,633,243.90 Rp 391,978.54
- Urugan Sirtu M3 0.48 Rp 589,914.29 Rp 283,158.86
- Pipa Pembungkus GIP Ø 50 mm ( 1 Titik) M' 4.00 Rp 123,725.01 Rp 494,900.03
Sub Jumlah Rp 1,235,971.42
Total Pekerjaan C 2 Rp 87,165,953.44
C 3 PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA RING Pipa Polyethelene (HDPE) Ø 32 mm
Area 1
I Pengadaan Dan Pemasangan Pipa Polyethelene (HDPE) Ø 32 mm Beserta Aksesories
- Pipa Polyethelene (HDPE) Ø 32 mm PN 16 M' 397.31 Rp 26,125.34 Rp 10,379,834.31
- Straight Coupler HDPE Ø 32 PN 16 Bh 4.00 Rp 31,810.24 Rp 127,240.97
- Tee Reduced HDPE Ø 50 X 50 X 32 PN 16 Bh 3.00 Rp 117,926.37 Rp 353,779.10
- Elbow HDPE Ø 32 mm - 90˚PN 16 Bh 8.00 Rp 35,852.43 Rp 286,819.42
- End Cap Ø 32 mm PN 16 Bh 3.00 Rp 15,114.26 Rp 45,342.78
Sub Jumlah Rp 11,193,016.59
Area 2
II Pengadaan Dan Pemasangan Pipa Polyethelene (HDPE) Ø 32 mm Beserta Aksesories
- Pipa Polyethelene (HDPE) Ø 32 mm PN 16 M' 1,061.35 Rp 26,125.34 Rp 27,728,239.70
- Straight Coupler HDPE Ø 32 PN 16 Bh 10.00 Rp 31,810.24 Rp 318,102.42
- Tee Equal HDPE Ø 32 X 32 X 32 PN 16 Bh 2.00 Rp 49,033.47 Rp 98,066.94
- Tee Reduced HDPE Ø 50 X 50 X 32 Bh 11.00 Rp 117,926.37 Rp 1,297,190.05
- Elbow HDPE Ø 32 mm - 90˚ PN 16 Bh 17.00 Rp 35,852.43 Rp 609,491.27
- Male Thread Joint HDPE Ǿ 32 mm PN 16 Bh 1.00 Rp 17,926.21 Rp 17,926.21
- End Cap Ø 32 mm PN 16 Bh 14.00 Rp 15,114.26 Rp 211,599.62
- Tee All Socket GIP. Ǿ 40 x 40 x 25 mm Bh 1.00 Rp 73,815.00 Rp 73,815.00
- Double Nipple GIP. 1 1/2" Bh 1.00 Rp 36,790.00 Rp 36,790.00
- Water Moor GIP. 1 1/2" Bh 1.00 Rp 87,230.00 Rp 87,230.00
Sub Jumlah Rp 30,478,451.22
Area 3
III Pengadaan Dan Pemasangan Pipa Polyethelene (HDPE) Ø 32 mm Beserta Aksesories
- Pipa Polyethelene (HDPE) Ø 32 mm PN 16 M' 167.17 Rp 26,125.34 Rp 4,367,392.10
- Straight Coupler HDPE Ø 32 PN 16 Bh 2.00 Rp 31,810.24 Rp 63,620.48
- Tee Equal HDPE Ø 32 X 32 X 32 PN 16 Bh 1.00 Rp 49,033.47 Rp 49,033.47
- Tee Reduced HDPE Ø 50 X 50 X 32 Bh 3.00 Rp 117,926.37 Rp 353,779.10
- Elbow HDPE Ø 32 mm - 90˚ PN 16 Bh 3.00 Rp 35,852.43 Rp 107,557.28
- End Cap Ø 32 mm PN 16 Bh 4.00 Rp 15,114.26 Rp 60,457.04
Sub Jumlah Rp 5,001,839.48
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN SATUAN VOLUME
(Rp.) (Rp.)
1 2 3 4 5 6
IV Kontruksi Galian Pemasangan Pipa HDPE Ø 32 mm
- Galian Tanah Biasa M3 73.16 Rp 60,500.00 Rp 4,426,332.39
- Urugan Tanah Bekas Galian M3 73.16 Rp 44,000.00 Rp 3,219,150.83
- Galian Tanah Keras M3 8.78 Rp 80,520.00 Rp 706,925.52
- Urugan Tanah Bekas Galian M3 8.78 Rp 44,000.00 Rp 386,298.10
Sub Jumlah Rp 8,738,706.84
V Pekerjaan Crossing Jalan Perkerasan (4 Titik)
- Galian Tanah Cadas/Aspal/Beton M3 0.30 Rp 122,100.00
Rp 36,630.00
- Beton mutu f’= 9,8 MPa (K 125) M3 0.15 Rp 1,633,243.90
Rp 244,986.58
- Urugan Sirtu M3 0.15 Rp 589,914.29
Rp 88,487.14
- Pipa Pembungkus GIP Ø 40 mm (2 Titik) M' 8.00 Rp 90,864.88
Rp 726,919.05
Sub Jumlah
Rp 1,097,022.77
Total Pekerjaan C 3 Rp 56,509,036.90
TOTAL PEKERJAAN C Rp 165,169,211.22
D PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA SR
D 1 PEKERJAAN PENGADAAN DAN PEMASANGAN Sambungan Rumah Beserta Aksesories
- Pipa GIP Ø 1/2 " M' 2.00 Rp 69,856.39 Rp 139,712.78
- Knie GIP Ø 1/2 " Bh 5.00 Rp 11,050.00 Rp 55,250.00
- Double Nipple GIP Ø 1/2 " Bh 2.00 Rp 9,750.00 Rp 19,500.00
- Plugh Kran GIP Ø 1/2 " Bh 1.00 Rp 50,087.95 Rp 50,087.95
- Water Meter Ø 15 mm ( 1/2" ) - SNI 2547 : 2008 Bh 1.00 Rp 281,195.51 Rp 281,195.51
- Check Valve (Katup Searah) Kuningan GIP 1/2" Type Swing Bh 1.00 Rp 119,769.00 Rp 119,769.00
- Stop Kran GIP Ø 1/2" Bh 1.00 Rp 74,692.56 Rp 74,692.56
- Kran Air 1/2 " Bh 1.00 Rp 13,181.04 Rp 13,181.04
- Box Penutup Bh 1.00 Rp 105,448.32 Rp 105,448.32
- Baut Moor 10 mm Bh 4.00 Rp 2,000.00 Rp 8,000.00
-
Pembuatan Dudukan Box Water Meter dan Perkuatan Tap Kran dari Beton K-
M3 0.02 Rp 1,633,243.90 Rp 29,398.39
125 1pc : 3ps :5k + Bekesting, sesuai spesifikasi Teknik dan gambar

Sub Jumlah Rp 896,235.55


JUMLAH SR : 123.00 UNIT Rp 110,236,972.51
D 2 PEKERJAAN PENGADAAN DAN PEMASANGAN Pipa Polyethelene (HDPE) Ø 20 mm Beserta Aksesories
- Pipa Polyethelene (HDPE) Ø 20 mm PN 16 M' 1,428.00 Rp 13,648.51 Rp 19,490,077.55
- Galian Tanah M3 32.13 Rp 60,500.00 Rp 1,943,865.00
- Urugan Tanah Bekas Galian M3 32.13 Rp 44,000.00 Rp 1,413,720.00
- Male Thread Joint Ǿ 20 mm PN 16 Bh 119.00 Rp 9,490.35 Rp 1,129,351.48
- Female Thread Elbow Ø 20 mm 90° PN 16 Bh 119.00 Rp 12,653.80 Rp 1,505,801.97
- Elbow Ø 20 mm 90° PN 16 Bh 7.00 Rp 18,277.71 Rp 127,943.96
- Clamp Sadle HDPE Ø 32 X 20 mm PN 16 Bh 86.00 Rp 36,379.67 Rp 3,128,651.58
- Clamp Sadle HDPE Ø 50 X 20 mm PN 16 Bh 33.00 Rp 40,949.10 Rp 1,351,320.19
Total Pekerjaan D 2 Rp 30,090,731.72
D 3 PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA GIP. Ø 15 mm Berserta Aksesories
- Pipa GIP Ø 1/2 " M' 40.45 Rp 69,856.39 Rp 2,825,690.97
- Socket GIP Ø 1/2" Bh 7.00 Rp 8,060.00 Rp 56,420.00
- Knie GIP Ø 1/2 " Bh 4.00 Rp 11,050.00 Rp 44,200.00
- Clamp Sadle GIP Ø 1" X 1/2" Bh 2.00 Rp 17,030.00 Rp 34,060.00
- Clamp Sadle GIP Ø 1 1/2" X 1/2" Bh 2.00 Rp 36,790.00 Rp 73,580.00
Total Pekerjaan D 3 Rp 3,033,950.97
TOTAL PEKERJAAN D Rp 143,361,655.21
E PEKERJAAN PAS. GATE VALVE
- Stop Kran Ǿ 40 mm (Gate VaLve) Bh 6.00 Rp 638,250.00 Rp 3,829,500.00
- Stop Kran Ǿ 25 mm (Gate VaLve) Bh 1.00 Rp 416,250.00 Rp 416,250.00
- Male Thread Joint HDPE Ǿ 50 mm PN 16 Bh 12.00 Rp 51,669.68 Rp 620,036.11
- Male Thread Joint HDPE Ǿ 32 mm PN 16 Bh 2.00 Rp 17,926.21 Rp 35,852.43
TOTAL PEKERJAAN E Rp 4,901,638.53
F PEKERJAAN PENYELESAIAN
- PembersihanKembali Lokasi Ls 1.00 Rp 1,500,000.00 Rp 1,500,000.00
- Pelaporan dan Dokumentasi Ls 1.00 Rp 1,500,000.00 Rp 1,500,000.00
- Ass Built Drawing Ls 1.00 Rp 1,200,000.00 Rp 1,200,000.00
- Uji Coba Pengaliran Ls 1.00 Rp 2,200,000.00 Rp 2,200,000.00
TOTAL PEKERJAAN F Rp 6,400,000.00
ANALISA HARGA SATUAN PEKERJAAN
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH
KABUPATEN
PEKERJAAN : PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA RATULODONG
LOKASI : DESA RATULODONG - KEC. TANJUNG BUNGA- KAB. FLORES TIMUR
T.A : 2023

Jenis Pekerjaan : A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m


Satuan Mata Pembayaran : Rp./M3
Kuantitas Pekerjaan M3
Harga Satuan : Rp. 60,500.00
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.750 70,000.00 52,500.00
2 Mandor OH 0.025 100,000.00 2,500.00

2 Material :
1 -

3 Peralatan :
1 -

Jumlah Harga Satuan 55,000.00


Keuntungan dan Biaya Overhead 10 % 5,500.00
Harga Satuan Pekerjaan 60,500.00

Jenis Pekerjaan : A.2.3.1.4. Penggalian 1 m3 tanah keras sedalam 1 m


Satuan Mata Pembayaran : Rp./M3
Kuantitas Pekerjaan M3
Harga Satuan : Rp. 80,520.00
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 1.000 70,000.00 70,000.00
2 Mandor OH 0.032 100,000.00 3,200.00

2 Material :
1 -

3 Peralatan :
1 -

Jumlah Harga Satuan 73,200.00


Keuntungan dan Biaya Overhead 10 % 7,320.00
Harga Satuan Pekerjaan 80,520.00

Jenis Pekerjaan : A.2.3.1.5. Penggalian 1 m3 tanah Cadas sedalam 1 m


Satuan Mata Pembayaran : Rp./M3
Kuantitas Pekerjaan M3
Harga Satuan : Rp. 122,100.00
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 1.500 70,000.00 105,000.00
2 Mandor OH 0.060 100,000.00 6,000.00

2 Material :
1 -

3 Peralatan :
1 -

Jumlah Harga Satuan 111,000.00


Keuntungan dan Biaya Overhead 10 % 11,100.00
Harga Satuan Pekerjaan 122,100.00

Jenis Pekerjaan : A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah


Satuan Mata Pembayaran : Rp./M3
Kuantitas Pekerjaan M3
Harga Satuan : Rp. 44,000.00
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.500 70,000.00 35,000.00
2 Mandor OH 0.050 100,000.00 5,000.00

2 Material :
1

3 Peralatan :
1 -

Jumlah Harga Satuan 40,000.00


Keuntungan dan Biaya Overhead 10 % 4,000.00
Harga Satuan Pekerjaan 44,000.00

Jenis Pekerjaan : A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug


Satuan Mata Pembayaran : Rp./M3
Kuantitas Pekerjaan M3
Harga Satuan : Rp. 589,914.29
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.300 70,000.00 21,000.00
2 Mandor OH 0.010 100,000.00 1,000.00

2 Material :
1 Pasir Urug m3 1.200 428,571.43 514,285.71

3 Peralatan :
1 -

Jumlah Harga Satuan 536,285.71


Keuntungan dan Biaya Overhead 10 % 53,628.57
Harga Satuan Pekerjaan 589,914.29

Jenis Pekerjaan : A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP
Satuan Mata Pembayaran : Rp./M3
Kuantitas Pekerjaan M3
Harga Satuan : Rp. 1,010,027.86
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 1.500 70,000.00 105,000.00
2 Tukang batu OH 0.750 85,000.00 63,750.00
3 Kepala tukang OH 0.075 90,000.00 6,750.00
4 Mandor OH 0.075 100,000.00 7,500.00

2 Material :
1 Batu belah m3 1.200 230,000.00 276,000.00
2 Semen Portland Kg 163.000 1,450.00 236,350.00
3 Pasir pasang m3 0.520 428,571.43 222,857.14

3 Peralatan :
1 -

Jumlah Harga Satuan 918,207.14


Keuntungan dan Biaya Overhead 10 % 91,820.71
Harga Satuan Pekerjaan 1,010,027.86
Jenis Pekerjaan : A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm
Satuan Mata Pembayaran : Rp./M3
Kuantitas Pekerjaan M3
Harga Satuan : Rp. 1,633,243.90
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 1.650 70,000.00 115,500.00
2 Tukang batu OH 0.275 85,000.00 23,375.00
3 Kepala tukang OH 0.028 90,000.00 2,520.00
4 Mandor OH 0.083 100,000.00 8,300.00

2 Material :
1 Semen Portland Kg 326.000 1,450.00 472,700.00
2 Pasir Beton Kg 760.000 344.79 262,038.85
3 Kerikil Kg 1,029.000 555.56 571,666.67
4 Air Liter 215.000 133.33 28,666.67

3 Peralatan :
1 -

Jumlah Harga Satuan 1,484,767.18


Keuntungan dan Biaya Overhead 10 % 148,476.72
Harga Satuan Pekerjaan 1,633,243.90

Jenis Pekerjaan : A.4.1.1.8. Membuat 1 m3 beton mutu f’c = 21,7 Mpa


Satuan Mata Pembayaran : Rp./M3
Kuantitas Pekerjaan M3
Harga Satuan : Rp. 1,706,074.87
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 1.650 70,000.00 115,500.00
2 Tukang batu OH 0.275 85,000.00 23,375.00
3 Kepala tukang OH 0.028 90,000.00 2,520.00
4 Mandor OH 0.083 100,000.00 8,300.00

2 Material :
1 Semen Portland Kg 384.000 1,450.00 556,800.00
2 Pasir Beton Kg 692.000 344.79 238,593.27
3 Kerikil Kg 1,039.000 555.56 577,222.22
4 Air Liter 215.000 133.33 28,666.67

3 Peralatan :
1 -

Jumlah Harga Satuan 1,550,977.15


Keuntungan dan Biaya Overhead 10 % 155,097.72
Harga Satuan Pekerjaan 1,706,074.87

Jenis Pekerjaan : A.4.1.1.17 Pembesian 10 kg dengan besi polos atau besi ulir
Satuan Mata Pembayaran : Rp./Kg
Kuantitas Pekerjaan Kg
Harga Satuan : Rp. 210,622.50
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.700 70,000.00 49,000.00
2 Tukang Besi OH 0.070 85,000.00 5,950.00
3 Kepala tukang OH 0.007 90,000.00 630.00
4 Mandor OH 0.004 100,000.00 400.00

2 Material :
1 Besi Beton Kg 10.500 12,625.00 132,562.50
2 Kawat Beton Kg 0.150 19,550.00 2,932.50

3 Peralatan :
1 -

Jumlah Harga Satuan 191,475.00


Keuntungan dan Biaya Overhead 10 % 19,147.50
Harga Satuan Pekerjaan 210,622.50

Jenis Pekerjaan : A.5.1.1 18. Pemasangan 1 m’ pipa galvanis diameter ½”


Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 69,856.39
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.054 70,000.00 3,780.00
2 Tukang Pipa OH 0.090 85,000.00 7,650.00
3 Kepala tukang OH 0.009 90,000.00 810.00
4 Mandor OH 0.027 100,000.00 2,700.00

2 Material :
1 Pipa Galvanize 1/2" m' 1.200 31,332.78 37,599.34
2 Perlengkapan Ls 35% x Hrg Pipa 10,966.47

3 Peralatan :
1 -

Jumlah Harga Satuan 63,505.81


Keuntungan dan Biaya Overhead 10 % 6,350.58
Harga Satuan Pekerjaan 69,856.39

Jenis Pekerjaan : A.5.1.1 20. Pemasangan 1 m’ pipa galvanis diameter ¾"


Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 16,434.00
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.054 70,000.00 3,780.00
2 Tukang Pipa OH 0.090 85,000.00 7,650.00
3 Kepala tukang OH 0.009 90,000.00 810.00
4 Mandor OH 0.027 100,000.00 2,700.00

2 Material :
1 Pipa Galvanize 3/4" m' 1.200 - -
2 Perlengkapan Ls 35% x Hrg Pipa -

3 Peralatan :
1 -

Jumlah Harga Satuan 14,940.00


Keuntungan dan Biaya Overhead 10 % 1,494.00
Harga Satuan Pekerjaan 16,434.00

Jenis Pekerjaan : A.5.1.1 21. Pemasangan 1 m’ pipa galvanis diameter 1”


Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 112,943.47
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.108 70,000.00 7,560.00
2 Tukang Pipa OH 0.180 85,000.00 15,300.00
3 Kepala tukang OH 0.018 90,000.00 1,620.00
4 Mandor OH 0.005 100,000.00 500.00

2 Material :
1 Pipa Galvanize 1" m' 1.200 50,126.37 60,151.65
2 Perlengkapan Ls 35% x Hrg Pipa 17,544.23

3 Peralatan :
1 -

Jumlah Harga Satuan 102,675.88


Keuntungan dan Biaya Overhead 10 % 10,267.59
Harga Satuan Pekerjaan 112,943.47

Jenis Pekerjaan : A.5.1.1 21. Pemasangan 1 m’ pipa galvanis diameter 1 1/4"


Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 146,060.55
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.108 70,000.00 7,560.00
2 Tukang Pipa OH 0.180 85,000.00 15,300.00
3 Kepala tukang OH 0.018 90,000.00 1,620.00
4 Mandor OH 0.005 100,000.00 500.00

2 Material :
1 Pipa Galvanize 1 1/4" m' 1.200 69,549.88 83,459.86
2 Perlengkapan Ls 35% x Hrg Pipa 24,342.46

3 Peralatan :
1 -

Jumlah Harga Satuan 132,782.32


Keuntungan dan Biaya Overhead 10 % 13,278.23
Harga Satuan Pekerjaan 146,060.55

Jenis Pekerjaan : A.5.1.1 22. Pemasangan 1 m’ pipa galvanis diameter 1 ½"


Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 182,402.62
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.108 70,000.00 7,560.00
2 Tukang Pipa OH 0.180 85,000.00 15,300.00
3 Kepala tukang OH 0.018 90,000.00 1,620.00
4 Mandor OH 0.005 100,000.00 500.00

2 Material :
1 Pipa Galvanize 1 1/2" m' 1.200 90,864.88 109,037.86
2 Perlengkapan Ls 35% x Hrg Pipa 31,802.71

3 Peralatan :
1 -

Jumlah Harga Satuan 165,820.57


Keuntungan dan Biaya Overhead 10 % 16,582.06
Harga Satuan Pekerjaan 182,402.62

Jenis Pekerjaan : A.5.1.1 22. Pemasangan 1 m’ pipa galvanis diameter 2"


Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 238,429.14
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.108 70,000.00 7,560.00
2 Tukang Pipa OH 0.180 85,000.00 15,300.00
3 Kepala tukang OH 0.018 90,000.00 1,620.00
4 Mandor OH 0.005 100,000.00 500.00
2 Material :
1 Pipa Galvanize 2" m' 1.200 123,725.01 148,470.01
2 Perlengkapan Ls 35% x Hrg Pipa 43,303.75

3 Peralatan :
1 -

Jumlah Harga Satuan 216,753.76


Keuntungan dan Biaya Overhead 10 % 21,675.38
Harga Satuan Pekerjaan 238,429.14

Jenis Pekerjaan : A.8.4.1.17 (K3) Pemasangan 1 m pipa HDPE Ø 63 mm


Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 87,226.73
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.035 70,000.00 2,450.00
2 Tukang Pipa OH 0.017 85,000.00 1,445.00
3 Mandor OH 0.003 100,000.00 300.00

2 Material :
1 Pipa HDPE dia 63 mm m' 1.000 75,102.02 75,102.02

3 Peralatan :

Jumlah Harga Satuan 79,297.02


Keuntungan dan Biaya Overhead 10 % 7,929.70
Harga Satuan Pekerjaan 87,226.73

Jenis Pekerjaan : A.8.4.1.17 (K3) Pemasangan 1 m pipa HDPE Ø 50 mm


Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 59,020.26
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.035 70,000.00 2,450.00
2 Tukang Pipa OH 0.017 85,000.00 1,445.00
3 Mandor OH 0.003 100,000.00 300.00

2 Material :
1 Pipa HDPE dia 50 mm m' 1.000 49,459.78 49,459.78

3 Peralatan :

Jumlah Harga Satuan 53,654.78


Keuntungan dan Biaya Overhead 10 % 5,365.48
Harga Satuan Pekerjaan 59,020.26

Jenis Pekerjaan : A.8.4.1.17 (K3) Pemasangan 1 m pipa HDPE Ø 32 mm


Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 26,125.34
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.035 70,000.00 2,450.00
2 Tukang Pipa OH 0.017 85,000.00 1,445.00
3 Mandor OH 0.003 100,000.00 300.00
2 Material :
1 Pipa HDPE dia 32 mm m' 1.000 19,555.31 19,555.31

3 Peralatan :

Jumlah Harga Satuan 23,750.31


Keuntungan dan Biaya Overhead 10 % 2,375.03
Harga Satuan Pekerjaan 26,125.34

Jenis Pekerjaan : A.8.4.1.17 (K3) Pemasangan 1 m pipa HDPE Ø 25 mm


Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 18,056.17
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.035 70,000.00 2,450.00
2 Tukang Pipa OH 0.017 85,000.00 1,445.00
3 Mandor OH 0.003 100,000.00 300.00

2 Material :
1 Pipa HDPE dia 25 mm m' 1.000 12,219.70 12,219.70

3 Peralatan :

Jumlah Harga Satuan 16,414.70


Keuntungan dan Biaya Overhead 10 % 1,641.47
Harga Satuan Pekerjaan 18,056.17

Jenis Pekerjaan : A.8.4.1.17 (K3) Pemasangan 1 m pipa HDPE Ø 20 mm


Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 13,648.51
(Sumber : AHS CK PERMEN PUPR NO. 01 TAHUN 2022 )
HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.035 70,000.00 2,450.00
2 Tukang Pipa OH 0.017 85,000.00 1,445.00
3 Mandor OH 0.003 100,000.00 300.00

2 Material :
1 Pipa HDPE dia 20 mm m' 1.000 8,212.74 8,212.74

3 Peralatan :

Jumlah Harga Satuan 12,407.74


Keuntungan dan Biaya Overhead 10 % 1,240.77
Harga Satuan Pekerjaan 13,648.51

Jenis Pekerjaan : A.2.2.1.13 Pembongkaran


Satuan Mata Pembayaran : Rp./m'
Kuantitas Pekerjaan m'
Harga Satuan : Rp. 6,921.75

HARGA JUMLAH
NO. JENIS PEKERJAAN SATUAN KOEF. SATUAN HARGA
( Rp. ) ( Rp. )
1 2 3 4 5 6=4x5

1 Tenaga Kerja :
1 Pekerja OH 0.053 70,000.00 3,675.00
2 Tukang Pipa OH 0.026 85,000.00 2,167.50
3 Mandor OH 0.005 100,000.00 450.00

2 Material :

3 Peralatan :

Jumlah Harga Satuan 6,292.50


Keuntungan dan Biaya Overhead 10 % 629.25
Harga Satuan Pekerjaan 6,921.75
UPAH TENAGA KERJA DAN HARGA SATUAN BAHAN
PENGEOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
NAMA KEGIATAN :
PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH
NAMA KEGIATAN : KABUPATEN/KOTA
PEKERJAAN : PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA
RATULODONG
LOKASI : DESA RATULODONG - KEC. TANJUNG BUNGA- KAB. FLORES TIMUR
TAHUN ANGGARAN : 2023

Upah Tenaga
No. Tenaga Kerja Satuan
Kerja (Rp./Hr)
1 Pekerja Org/Hari Rp 70,000.00
2 Mandor Org/Hari Rp 100,000.00
3 Kepala Tukang Org/Hari Rp 90,000.00
4 Tukang Kayu Org/Hari Rp 85,000.00
5 Tukang Batu Org/Hari Rp 85,000.00
6 Tukang Besi Org/Hari Rp 85,000.00
7 Tukang Las Org/Hari Rp 85,000.00
8 Tukang Pipa Org/Hari Rp 85,000.00
9 Tukang Cat Org/Hari Rp 85,000.00
10 Operator Org/Hari Rp 90,000.00
11 Pembantu Operator Org/Hari Rp 70,000.00
12 Driver Org/Hari Rp 90,000.00
13 Pembantu Driver Org/Hari Rp 70,000.00
14 Mekanik Org/Hari Rp 85,000.00
15 Helper (Pembantu) Org/Hari Rp 70,000.00
16 Welder (Tukang Las) Org/Hari Rp 85,000.00

No. Material Satuan Harga ( Rp )


1 2 3 4
BAHAN LOKAL
1 SemenPortland 40 kg Kg Rp 1,450.00
2 SemenPortland 40 kg Zak Rp 58,000.00
4 Pasir Urug M3 Rp 428,571.43
5 Pasir Pasang M3 Rp 428,571.43
6 Pasir Beton M3 Rp 428,571.43
7 Pasir Beton Kg Rp 344.79
8 Sirtu M3 Rp 150,000.00
9 Batu Kali/Gunung M3 Rp 230,000.00
10 Koral Beton M3 Rp 666,666.67
11 Tanah Biasa M3 Rp 66,666.67
2 Kayu Klass III M3 Rp 2,500,000.00
12 Papan Bekisting 3/30 M3 Rp 2,500,000.00
3 Kayu Klas II Balok M3 Rp 5,000,000.00
13 Kayu Kaso 5/7 M3 Rp 5,000,000.00
14 Kayu Jati Balok M3 Rp 8,500,000.00
15 Bata Merah Bh Rp 1,500.00
16 Kayu Klas II Papan M3 Rp 5,000,000.00
17 Kayu Dolken Panjang 4 Meter Btg Rp 10,000.00
18 Paku Biasa Kg Rp 22,000.00
19 Besi Beton Kg Rp 12,625.00
20 Kawat Beton Kg Rp 19,550.00
21 Minyak Bekesting Kg Rp 20,125.00
22 Sealant Tube Rp 33,350.00
23 Seltip M' Rp 250.00
23 Paku 2-3 Kg Rp 18,000.00
24 Paku 5-7 Kg Rp 25,000.00
25 Paku 10 Kg Rp 17,000.00
26 Paku 12 Kg Rp 20,000.00
27 Air Bersih M3 Rp 133,333.33
28 Air Bersih Ltr Rp 133.33
29 Minyak Bensin Ltr Rp 8,500.00
30 Minyak Solar Ltr Rp 14,000.00
31 Minyak Pelumas Ltr Rp 40,250.00
No. Material Satuan Harga ( Rp )
1 2 3 4
BAHAN NON LOKAL
A PIPA POLYETHYLENE (PE) DAN AKSESORIES
STANDARD SNI 16 - 4829 - 2005 / IS0 4427.96, S-5 SDR 11 (PN 16)
1 Pipa Polyethylene (PE) Ø 63 mm (2") M' Rp 75,102.02
2 Pipa Polyethylene (PE) Ø 50 mm (1,5") M¹ Rp 49,459.78
3 Pipa Polyethylene (PE) Ø 32 mm (1") M¹ Rp 19,555.31
4 Pipa Polyethylene (PE) Ø 25 mm (3/4") M¹ Rp 12,219.70
5 Pipa Polyethylene (PE) Ø 20 mm (1/2") M¹ Rp 8,212.74
6 Box Penutup Buah Rp 105,448.32
7 Elbow Ø 63 mm - 90˚ Buah Rp 149,736.61
8 Elbow Ø 50 mm - 90˚ Buah Rp 94,376.24
9 Elbow Ø 32 mm - 90˚ Buah Rp 35,852.43
10 Elbow Ø 25 mm - 90˚ Buah Rp 24,780.35
11 Elbow Ø 20 mm - 90˚ Buah Rp 18,277.71
12 Kran Air Ø 20 Buah Rp 13,181.04
13 Tee Equal HDPE Ø 63 X 63 X 63 Buah Rp 222,320.20
14 Tee Equal HDPE Ø 50 X 50 X 50 Buah Rp 135,325.34
15 Tee Equal HDPE Ø 32 X 32 X 32 Buah Rp 49,033.47
16 Tee Equal HDPE Ø 25 X 25 X 25 Buah Rp 35,500.93
17 Tee Equal HDPE Ø 20 X 20 X 20 Buah Rp 25,483.34
18 Tee Reduced HDPE Ø 63 X 63 X 32 Buah Rp 196,836.86
19 Tee Reduced HDPE Ø 50 X 50 X 32 Buah Rp 117,926.37
20 Tee Reduced HDPE Ø 50 X 50 X 25 Buah Rp 114,762.92
21 Tee Reduced HDPE Ø 32 X 32 X 25 Buah Rp 47,627.49
22 Tee Reduced HDPE Ø 25 X 25 X 20 Buah Rp 32,864.73
23 Plugh Valve Ø 20mm Buah Rp 50,087.95
21 Male Thread Elbow Ø 63 x 63 mm 90° Buah Rp 95,254.98
22 Male Thread Elbow Ø 50 x 50 mm 90° Buah Rp 61,687.27
23 Male Thread Elbow Ø 32 x 32 mm 90° Buah Rp 20,562.42
24 Male Thread Elbow Ø 20 x 20 mm 90° Buah Rp 10,896.33
23 Female Thread Elbow Ø 63 x 63 mm 90° Buah Rp 113,356.94
24 Female Thread Elbow Ø 50 x 50 mm 90° Buah Rp 69,771.64
25 Female Thread Elbow Ø 32 x 32 mm 90° Buah Rp 24,604.61
25 Female Thread Elbow Ø 20 x 20 mm 90° Buah Rp 12,653.80
26 Straight Coupler HDPE Ø 63 Buah Rp 131,986.14
27 Straight Coupler HDPE Ø 50 Buah Rp 83,304.17
28 Straight Coupler HDPE Ø 32 Buah Rp 31,810.24
29 Straight Coupler HDPE Ø 25 Buah Rp 23,374.38
30 Straight Coupler HDPE Ø 20 Buah Rp 17,926.21
31 Male Thread Joint HDPE Ǿ 63 mm Buah Rp 72,583.59
31 Male Thread Joint HDPE Ǿ 50 mm Buah Rp 51,669.68
32 Male Thread Joint HDPE Ǿ 32 mm Buah Rp 17,926.21
33 Male Thread Joint HDPE Ǿ 20 mm Buah Rp 9,490.35
34 Female Thread Joint HDPE Ǿ 63 mm Buah Rp 95,254.98
35 Female Thread Joint HDPE Ǿ 50 mm Buah Rp 61,687.27
36 Female Thread Joint HDPE Ǿ 32 mm Buah Rp 20,562.42
37 Female Thread Joint HDPE Ǿ 20 mm Buah Rp 10,896.33
38 Clamp Sadle Ø 63 X 32 mm Buah Rp 59,929.79
39 Clamp Sadle Ø 63' X 20 mm Buah Rp 58,875.31
40 Clamp Sadle Ø 50 X 20 mm Buah Rp 40,949.10
41 Clamp Sadle Ø 32 X 20 mm Buah Rp 36,379.67
41 Reducer Ø 63 X 50 mm Buah Rp 112,126.71
42 Reducer Ø 50 X 32 mm Buah Rp 63,796.23
43 Reducer Ø 32 X 25 mm Buah Rp 26,889.32
44 Reducer Ø 25 X 20 mm Buah Rp 20,913.92
45 Stop Kran Ø 1/2 (Gate Valve) Buah Rp 74,692.56
46 Water Meter Ø 15 mm ( 1/2" ) - SNI 2547 : 2008 Buah Rp 281,195.51
47 End Cap Ø 50 mm Buah Rp 45,518.52
48 End Cap Ø 40 mm Buah Rp 35,149.44
49 End Cap Ø 32 mm Buah Rp 15,114.26
50 End Cap Ø 25 mm Buah Rp 10,896.33
51 End Cap Ø 20 mm Buah Rp 8,260.12
B PIPA GALVANIZED IRON PIPE (GIP) DAN ACESSORIES DAN AKSESORIES
STANDARD SNI 07-0039-2010/BS 1387 - 1985/MEDIUM A
1 Galvanized Iron Pipe (GIP) Ǿ 50 mm M¹ Rp 123,725.01
2 Galvanized Iron Pipe (GIP) Ǿ 40 mm M¹ Rp 90,864.88
3 Galvanized Iron Pipe (GIP) Ǿ 32 mm M¹ Rp 69,549.88
4 Galvanized Iron Pipe (GIP) Ǿ 25 mm M¹ Rp 50,126.37
5 Galvanized Iron Pipe (GIP) Ǿ 15 mm M¹ Rp 31,332.78
5 Socket GIP. Ǿ 50 mm Buah Rp 45,110.00
6 Socket GIP. Ǿ 40 mm Buah Rp 29,510.00
7 Socket GIP. Ǿ 25 mm Buah Rp 17,030.00
8 Socket GIP. Ǿ 20 mm Buah Rp 10,270.00
9 Socket GIP. Ǿ 15 mm Buah Rp 8,060.00
10 Double Nipple GIP. Ǿ 50 mm Buah Rp 50,310.00
11 Double Nipple GIP. Ǿ 40 mm Buah Rp 36,790.00
12 Double Nipple GIP. Ǿ 32 mm Buah Rp 23,270.00
12 Double Nipple GIP. Ǿ 25 mm Buah Rp 15,990.00
13 Double Nipple GIP. Ǿ 15 mm Buah Rp 9,750.00
14 Water Moor GIP. dia 15 mm Buah Rp 31,790.00
15 Water Moor GIP. dia 25 mm Buah Rp 41,800.00
16 Water Moor GIP. dia 40 mm Buah Rp 87,230.00
17 Water Moor GIP. dia 50 mm Buah Rp 125,400.00
18 Over Socket GIP. Ǿ 50 mm x 40 mm Buah Rp 181,500.00
19 Tee All Socket GIP. Ǿ 50 mm x 40 mm x 40 mm Buah Rp 327,802.20
19 Stop Kran Ǿ 50 mm (Gate Valve) Buah Rp 666,000.00
20 Stop Kran Ǿ 40 mm (Gate Valve) Buah Rp 638,250.00
21 Stop Kran Ǿ 25 mm (Gate Valve) Buah Rp 416,250.00
22 Kenie GIP. Ǿ 50 mm Buah Rp 62,270.00
23 Kenie GIP. Ǿ 40 mm Buah Rp 39,650.00
24 Kenie GIP. Ǿ 25 mm Buah Rp 19,890.00
25 Kenie GIP. Ǿ 15 mm Buah Rp 11,050.00
27 Katup Searah Ǿ 15 mm Buah Rp 119,769.00
28 Water Meter All Flange Ǿ 100 mm Buah Rp 11,820,168.00
29 Water Meter All Flange Ǿ 75 mm Buah Rp 8,723,268.00
30 Water Meter All Flange Ǿ 25 mm Buah Rp 5,106,000.00
31 Giboult Joint CI. Ǿ 200 mm Buah Rp 420,912.00
32 Giboult Joint CI. Ǿ 160/150 mm Buah Rp 412,920.00
33 Giboult Joint CI. Ǿ 110/100 mm Buah Rp 196,270.20
34 Giboult Joint CI. Ǿ 90/75 mm Buah Rp 149,650.20
35 Giboult Joint CI. Ǿ 63/50 mm Buah Rp 98,601.30
36 Y All Flange Ǿ250 x 250 x 250 mm Buah Rp 1,058,940.00
37 Tee All Flange Ǿ100 x 100 x 75 mm Buah Rp 338,106.00
38 Tee All Flange Ǿ100 x 100 x 50 mm Buah Rp 317,555.46
39 Tee All Flange Ǿ Ǿ 75 x 75 x 75 mm Buah Rp 287,392.32
40 Tee All Flange Ǿ 75 x 75 x 50 mm Buah Rp 417,804.00
41 Tee All Flange Ǿ 40 x 40 x 40 mm Buah Rp 330,782.22
42 Tee All Socket GIP. Ǿ 50 x 50 x 50 mm Buah Rp 173,160.00
43 Tee All Socket GIP. Ǿ 50 x 50 x 40 mm Buah Rp 133,200.00
44 Tee All Socket GIP. Ǿ 40 x 40 x 25 mm Buah Rp 73,815.00
45 Tee GIP. Ǿ 25 x 25 x 25 mm Buah Rp 97,125.00
46 Tee GIP. Ǿ 15 x 15 x 15 mm Buah Rp 35,076.00
47 Cheeck Valve All Flange PN.10 Ǿ 100 mm Buah Rp 3,088,108.80
48 Cheeck Valve All Flange PN.10 Ǿ 50 mm Buah Rp 2,214,450.00
49 Gate Valve All Flange PN.10 Ǿ 63 mm Buah Rp 1,339,770.00
50 Gate Valve All Flange PN.10 Ǿ 50 mm Buah Rp 853,425.72
51 Flange Spigot GIP. Ǿ 75 mm Buah Rp 118,522.47
52 Flange Spigot GIP. Ǿ 50 mm Buah Rp 81,526.17
53 Flange Flexible Joint PN 20 Ø 150 mm Buah Rp 427,794.00
54 Flange Flexible Joint PN 20 Ø 100 mm Buah Rp 362,859.00
55 Flange Threaded GIP. Ǿ 150 mm Buah Rp 132,922.64
56 Flange Threaded GIP. Ǿ 100 mm Buah Rp 87,472.44
57 Flange Threaded GIP. Ǿ 75 mm Buah Rp 75,955.97
58 Flange Threaded GIP. Ǿ 50 mm Buah Rp 67,846.39
59 Dop/Kop dia 50 mm Buah Rp 66,600.00
60 Dop/Kop dia 40 mm Buah Rp 41,070.00
61 Dop/Kop dia 20 mm Buah Rp 31,635.00
62 Dop/Kop dia 15 mm Buah Rp 26,085.00
63 Plugh Kran GIP Ø 1/2 " Buah Rp 63,270.00
64 Paking Karet Ǿ 50 mm Buah Rp 8,214.00
65 Baut Moer 5/8 x 3 Metal + Ring Buah Rp 7,215.00
66 Reducer 40 x 25 Buah Rp 55,500.00
67 Reducer 50 x 40 Buah Rp 68,820.00
C PERALATAN
1 Sewa Dump Truck Jam Rp 426,632.07
2 Exavator Jam Rp 675,450.64
3 Mesin las HDPE Jam Rp 170,882.00
4 Mesin Las Listrik Jam Rp 200,000.00
5 Pompa Tes Tekan Jam Rp 200,000.00
6 Stamper Jam Rp 200,000.00
7 Concrete Mixer Jam Rp 177,022.09
8 Concrete Vibrator Jam Rp 200,000.00
9 Jack Hammer Jam Rp 200,000.00
10 Genset Jam Rp 200,000.00
11 Tripod/ Tackle & Handle Crane 2T Jam Rp 200,000.00
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA RATULODONG
LOKASI : DESA RATULODONG - KEC. TANJUNG BUNGA- KAB. FLORES TIMUR
T.A : 2023

No. URAIAN Sat KET.

3. Pipa HDPE Ø 63 mm ( 2 inch ) Pn 16 Sdr 11

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Larantuka O1 74,389.06 Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S 36.00 Km
- Jarak Angkut ( PP = 2 x L ) 72.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 3.43 Jam
- Jumlah trip perhari (Tk/t2) t3 2.04 Trip
- Kapasitas angkut per trip m 2,771.68 m'
- Biaya Sewa Truck/Hari A 2,986,424.48 Rupiah
- Produksi per hari t3 x m Kp 5,650.99 m'
- Biaya angkut A / Kp O2 528.48 Rp/m'
- Upah Pekerja 70,000.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 49.55 Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L 1.00 km.
b - Jarak angkut PP = 2xL 2.00 km.
2,000.00 meter
c - Jam kerja efektif 7.00 jam
d - Kecepatan berjalan 1.50 m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d 1.33 Jam
e2. Waktu lain-lain PP 5.00 Menit
0.08 Jam
f - Jumlah trip perhari (c-e2) / e1 5.19 Trip
g - Kapasitas Angkut perorang 100.00 meter
h - Produksi per hari gxf 518.75 meter

i - Ongkos angkut = Upah pekerja Rp 70,000.00 O4 134.94 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Larantuka 74,389.06 Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Ratulodong 528.48 Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Ratulodong 49.55 Rp/m
d Biaya Angkut dari Desa Ke Lokasi 134.94 Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI 75,102.02 Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA RATULODONG
LOKASI : DESA RATULODONG - KEC. TANJUNG BUNGA- KAB. FLORES TIMUR
T.A : 2023

No. URAIAN Sat KET.

4. Pipa HDPE Ø 50 mm ( 1 1/2 inch ) Pn 16 Sdr 11

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Larantuka O1 48,735.02 Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S 36.00 Km
- Jarak Angkut ( PP = 2 x L ) 72.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 3.43 Jam
- Jumlah trip perhari (Tk/t2) t3 2.04 Trip
- Kapasitas angkut per trip m 2,716.24 m'
- Biaya Sewa Truck/Hari A 2,986,424.48 Rupiah
- Produksi per hari t3 x m Kp 5,537.97 m'
- Biaya angkut A / Kp O2 539.26 Rp/m'
- Upah Pekerja 70,000.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 50.56 Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L 1.00 km.
b - Jarak angkut PP = 2xL 2.00 km.
2,000.00 meter
c - Jam kerja efektif 7.00 jam
d - Kecepatan berjalan 1.50 m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d 1.33 Jam
e2. Waktu lain-lain PP 5.00 Menit
0.08 Jam
f - Jumlah trip perhari (c-e2) / e1 5.19 Trip
g - Kapasitas Angkut perorang 100.00 meter
h - Produksi per hari gxf 518.75 meter

i - Ongkos angkut = Upah pekerja Rp 70,000.00 O4 134.94 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Larantuka 48,735.02 Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Ratulodong 539.26 Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Ratulodong 50.56 Rp/m
d Biaya Angkut dari Desa Ke Lokasi 134.94 Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI 49,459.78 Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA RATULODONG
LOKASI : DESA RATULODONG - KEC. TANJUNG BUNGA- KAB. FLORES TIMUR
T.A : 2023

No. URAIAN Sat KET.

6. Pipa HDPE Ø 32 mm ( 1 inch ) Pn 16 Sdr 11

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Larantuka O1 19,338.71 Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S 36.00 Km
- Jarak Angkut ( PP = 2 x L ) 72.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 3.43 Jam
- Jumlah trip perhari (Tk/t2) t3 2.04 Trip
- Kapasitas angkut per trip m 10,742.96 m'
- Biaya Sewa Truck/Hari A 2,986,424.48 Rupiah
- Produksi per hari t3 x m Kp 21,903.12 m'
- Biaya angkut A / Kp O2 136.35 Rp/m'
- Upah Pekerja 70,000.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 12.78 Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L 1.00 km.
b - Jarak angkut PP = 2xL 2.00 km.
2,000.00 meter
c - Jam kerja efektif 7.00 jam
d - Kecepatan berjalan 1.50 m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d 1.33 Jam
e2. Waktu lain-lain PP 5.00 Menit
0.08 Jam
f - Jumlah trip perhari (c-e2) / e1 5.19 Trip
g - Kapasitas Angkut perorang 200.00 meter
h - Produksi per hari gxf 1,037.50 meter

i - Ongkos angkut = Upah pekerja Rp 70,000.00 O4 67.47 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Larantuka 19,338.71 Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Ratulodong 136.35 Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Ratulodong 12.78 Rp/m
d Biaya Angkut dari Desa Ke Lokasi 67.47 Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI 19,555.31 Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA RATULODONG
LOKASI : DESA RATULODONG - KEC. TANJUNG BUNGA- KAB. FLORES TIMUR
T.A : 2023

No. URAIAN Sat KET.

7. Pipa HDPE Ø 25 mm ( 3/4 inch ) Pn 16 Sdr 11

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Larantuka O1 12,061.21 Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S 36.00 Km
- Jarak Angkut ( PP = 2 x L ) 72.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 3.43 Jam
- Jumlah trip perhari (Tk/t2) t3 2.04 Trip
- Kapasitas angkut per trip m 17,601.26 m'
- Biaya Sewa Truck/Hari A 2,986,424.48 Rupiah
- Produksi per hari t3 x m Kp 35,886.07 m'
- Biaya angkut A / Kp O2 83.22 Rp/m'
- Upah Pekerja 70,000.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 7.80 Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L 1.00 km.
b - Jarak angkut PP = 2xL 2.00 km.
2,000.00 meter
c - Jam kerja efektif 7.00 jam
d - Kecepatan berjalan 1.50 m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d 1.33 Jam
e2. Waktu lain-lain PP 5.00 Menit
0.08 Jam
f - Jumlah trip perhari (c-e2) / e1 5.19 Trip
g - Kapasitas Angkut perorang 200.00 meter
h - Produksi per hari gxf 1,037.50 meter

i - Ongkos angkut = Upah pekerja Rp 70,000.00 O4 67.47 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Larantuka 12,061.21 Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Ratulodong 83.22 Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Ratulodong 7.80 Rp/m
d Biaya Angkut dari Desa Ke Lokasi 67.47 Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI 12,219.70 Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA RATULODONG
LOKASI : DESA RATULODONG - KEC. TANJUNG BUNGA- KAB. FLORES TIMUR
T.A : 2023

No. URAIAN Sat KET.

8. Pipa HDPE Ø 20 mm ( 1/2 inch ) Pn 16 Sdr 11

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Larantuka O1 8,087.02 Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S 36.00 Km
- Jarak Angkut ( PP = 2 x L ) 72.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 3.43 Jam
- Jumlah trip perhari (Tk/t2) t3 2.04 Trip
- Kapasitas angkut per trip m 27,501.97 m'
- Biaya Sewa Truck/Hari A 2,986,424.48 Rupiah
- Produksi per hari t3 x m Kp 56,071.99 m'
- Biaya angkut A / Kp O2 53.26 Rp/m'
- Upah Pekerja 70,000.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 4.99 Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L 1.00 km.
b - Jarak angkut PP = 2xL 2.00 km.
2,000.00 meter
c - Jam kerja efektif 7.00 jam
d - Kecepatan berjalan 1.50 m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d 1.33 Jam
e2. Waktu lain-lain PP 5.00 Menit
0.08 Jam
f - Jumlah trip perhari (c-e2) / e1 5.19 Trip
g - Kapasitas Angkut perorang 200.00 meter
h - Produksi per hari gxf 1,037.50 meter

i - Ongkos angkut = Upah pekerja Rp 70,000.00 O4 67.47 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Larantuka 8,087.02 Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Ratulodong 53.26 Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Ratulodong 4.99 Rp/m
d Biaya Angkut dari Desa Ke Lokasi 67.47 Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI 8,212.74 Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA RATULODONG
LOKASI : DESA RATULODONG - KEC. TANJUNG BUNGA- KAB. FLORES TIMUR
T.A : 2023

No. URAIAN Sat KET.

12. Pipa Galvanis 2" Medium A

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Larantuka O1 122,428.17 Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S 36.00 Km
- Jarak Angkut ( PP = 2 x L ) 72.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 3.43 Jam
- Jumlah trip perhari (Tk/t2) t3 2.04 Trip
- Kapasitas angkut per trip m 9,296.23 m'
- Biaya Sewa Truck/Hari A 2,986,424.48 Rupiah
- Produksi per hari t3 x m Kp 18,953.48 m'
- Biaya angkut A / Kp O2 157.57 Rp/m'
- Upah Pekerja 70,000.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 14.77 Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L 1.00 km.
b - Jarak angkut PP = 2xL 2.00 km.
2,000.00 meter
c - Jam kerja efektif 7.00 jam
d - Kecepatan berjalan 1.50 m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d 1.33 Jam
e2. Waktu lain-lain PP 5.00 Menit
0.08 Jam
f - Jumlah trip perhari (c-e2) / e1 5.19 Trip
g - Kapasitas Angkut perorang 12.00 meter
h - Produksi per hari gxf 62.25 meter

i - Ongkos angkut = Upah pekerja Rp 70,000.00 O4 1,124.50 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Larantuka 122,428.17 Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Ratulodong 157.57 Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Ratulodong 14.77 Rp/m
d Biaya Angkut dari Desa Ke Lokasi 1,124.50 Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI 123,725.01 Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA RATULODONG
LOKASI : DESA RATULODONG - KEC. TANJUNG BUNGA- KAB. FLORES TIMUR
T.A : 2023

No. URAIAN Sat KET.

13. Pipa Galvanis 1 1/2" Medium A

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Larantuka O1 89,473.45 Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S 36.00 Km
- Jarak Angkut ( PP = 2 x L ) 72.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 3.43 Jam
- Jumlah trip perhari (Tk/t2) t3 2.04 Trip
- Kapasitas angkut per trip m 6,001.79 m'
- Biaya Sewa Truck/Hari A 2,986,424.48 Rupiah
- Produksi per hari t3 x m Kp 12,236.66 m'
- Biaya angkut A / Kp O2 244.06 Rp/m'
- Upah Pekerja 70,000.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 22.88 Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L 1.00 km.
b - Jarak angkut PP = 2xL 2.00 km.
2,000.00 meter
c - Jam kerja efektif 7.00 jam
d - Kecepatan berjalan 1.50 m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d 1.33 Jam
e2. Waktu lain-lain PP 5.00 Menit
0.08 Jam
f - Jumlah trip perhari (c-e2) / e1 5.19 Trip
g - Kapasitas Angkut perorang 12.00 meter
h - Produksi per hari gxf 62.25 meter

i - Ongkos angkut = Upah pekerja Rp 70,000.00 O4 1,124.50 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Larantuka 89,473.45 Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Ratulodong 244.06 Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Ratulodong 22.88 Rp/m
d Biaya Angkut dari Desa Ke Lokasi 1,124.50 Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI 90,864.88 Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA RATULODONG
LOKASI : DESA RATULODONG - KEC. TANJUNG BUNGA- KAB. FLORES TIMUR
T.A : 2023

No. URAIAN Sat KET.

14. Pipa Galvanis 1 1/4" Medium A

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Larantuka O1 68,254.54 Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S 36.00 Km
- Jarak Angkut ( PP = 2 x L ) 72.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 3.43 Jam
- Jumlah trip perhari (Tk/t2) t3 2.04 Trip
- Kapasitas angkut per trip m 9,377.80 m'
- Biaya Sewa Truck/Hari A 2,986,424.48 Rupiah
- Produksi per hari t3 x m Kp 19,119.78 m'
- Biaya angkut A / Kp O2 156.20 Rp/m'
- Upah Pekerja 70,000.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 14.64 Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L 1.00 km.
b - Jarak angkut PP = 2xL 2.00 km.
2,000.00 meter
c - Jam kerja efektif 7.00 jam
d - Kecepatan berjalan 1.50 m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d 1.33 Jam
e2. Waktu lain-lain PP 5.00 Menit
0.08 Jam
f - Jumlah trip perhari (c-e2) / e1 5.19 Trip
g - Kapasitas Angkut perorang 12.00 meter
h - Produksi per hari gxf 62.25 meter

i - Ongkos angkut = Upah pekerja Rp 70,000.00 O4 1,124.50 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Larantuka 68,254.54 Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Ratulodong 156.20 Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Ratulodong 14.64 Rp/m
d Biaya Angkut dari Desa Ke Lokasi 1,124.50 Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI 69,549.88 Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA RATULODONG
LOKASI : DESA RATULODONG - KEC. TANJUNG BUNGA- KAB. FLORES TIMUR
T.A : 2023

No. URAIAN Sat KET.

15. Pipa Galvanis 1" Medium A

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Larantuka O1 48,897.60 Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S 36.00 Km
- Jarak Angkut ( PP = 2 x L ) 72.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 3.43 Jam
- Jumlah trip perhari (Tk/t2) t3 2.04 Trip
- Kapasitas angkut per trip m 15,364.59 m'
- Biaya Sewa Truck/Hari A 2,986,424.48 Rupiah
- Produksi per hari t3 x m Kp 31,325.85 m'
- Biaya angkut A / Kp O2 95.33 Rp/m'
- Upah Pekerja 70,000.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 8.94 Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L 1.00 km.
b - Jarak angkut PP = 2xL 2.00 km.
2,000.00 meter
c - Jam kerja efektif 7.00 jam
d - Kecepatan berjalan 1.50 m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d 1.33 Jam
e2. Waktu lain-lain PP 5.00 Menit
0.08 Jam
f - Jumlah trip perhari (c-e2) / e1 5.19 Trip
g - Kapasitas Angkut perorang 12.00 meter
h - Produksi per hari gxf 62.25 meter

i - Ongkos angkut = Upah pekerja Rp 70,000.00 O4 1,124.50 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Larantuka 48,897.60 Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Ratulodong 95.33 Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Ratulodong 8.94 Rp/m
d Biaya Angkut dari Desa Ke Lokasi 1,124.50 Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI 50,126.37 Rp/m
ANALISA JARAK ANGKUT PIPA DAN PEMBONGKARAN
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA RATULODONG
LOKASI : DESA RATULODONG - KEC. TANJUNG BUNGA- KAB. FLORES TIMUR
T.A : 2023

No. URAIAN Sat KET.

17. Pipa Galvanis 1/2" Medium A

a. Biaya Angkut ( Trasportasi truk )


- Harga Di Pelabuhan Larantuka O1 30,545.58 Per m'

ANALISA ANGKUT :
- Pelabuhan ke Site S 36.00 Km
- Jarak Angkut ( PP = 2 x L ) 72.00 Km
- Kecepatan Rata-rata dengan muatan v1 40.00 Km/Jam
- Kecepatan Rata-rata tanpa muatan v2 50.00 Km/Jam
- Kecepatan Rata-rata v3 45.00 Km/Jam
- Jumlah Pekerja yang dibutuhkan P 4.00 Orang
- Jam Kerja per Hari Tk 7.00 Jam
- Lamanya Waktu Muat/Bongkar+ waktu lain-lain t1 1.83 Jam
- Waktu Tempuh per trip = {(2 x L)/v3} + t1 t2 3.43 Jam
- Jumlah trip perhari (Tk/t2) t3 2.04 Trip
- Kapasitas angkut per trip m 42,679.41 m'
- Biaya Sewa Truck/Hari A 2,986,424.48 Rupiah
- Produksi per hari t3 x m Kp 87,016.26 m'
- Biaya angkut A / Kp O2 34.32 Rp/m'
- Upah Pekerja 70,000.00 Rp/Hari
- Analisa Bongkar/Muat P x U1 O3 3.22 Rp/ m'
Kp

b. Biaya Angkut ( Dengan Tenaga Manusia )


a - Jarak = L 1.00 km.
b - Jarak angkut PP = 2xL 2.00 km.
2,000.00 meter
c - Jam kerja efektif 7.00 jam
d - Kecepatan berjalan 1.50 m/dtk
e - Waktu yang ditempuh (PP)
e1. Lama berjalan PP (2 x L)/d 1.33 Jam
e2. Waktu lain-lain PP 5.00 Menit
0.08 Jam
f - Jumlah trip perhari (c-e2) / e1 5.19 Trip
g - Kapasitas Angkut perorang 18.00 meter
h - Produksi per hari gxf 93.38 meter

i - Ongkos angkut = Upah pekerja Rp 70,000.00 O4 749.67 Rp/m


Produksi
C Total Biaya Angkut sampai Lokasi
a Harga Dasar sampai Pelabuhan Larantuka 30,545.58 Rp/m
b Biaya Angkut dari Pelabuhan sampai Desa Ratulodong 34.32 Rp/m
c Biaya Bongkar Muat dari Pelabuhan sampai Desa Ratulodong 3.22 Rp/m
d Biaya Angkut dari Desa Ke Lokasi 749.67 Rp/m
TOTAL BIAYA MATERIAL SAMPAI LOKASI 31,332.78 Rp/m
ANALISA BIAYA PIPA DILOKASI SEMENTARA
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA RATULODONG
LOKASI : DESA RATULODONG - KEC. TANJUNG BUNGA- KAB. FLORES TIMUR
T.A : 2023

Price List 2023 Pengiriman Harga Pipa


Harga surabaya Door To Door dari Pabrik Asuransi 0,3 % di Pel. Larantuka
No. Jenis dan Ukuran
ke Lokasi di Larantuka
(Rp./M') (Rp./M') (Rp./M') (Rp./M')

1 Pipa PE Ø 63 mm ( 2 inch ) Pn 16 69,850.00 4,329.51 209.55 74,389.06


2 Pipa PE Ø 50 mm ( 1 1/2 inch ) Pn 16 44,184.60 4,417.86 132.55 48,735.02
3 Pipa PE Ø 32 mm ( 1 inch ) Pn 16 18,167.20 1,117.01 54.50 19,338.71
4 Pipa PE Ø 25 mm ( 3/4 inch ) Pn 16 11,345.40 681.77 34.04 12,061.21
5 Pipa PE Ø 20 mm ( 1/2 inch ) Pn 16 7,627.80 436.33 22.88 8,087.02
6 Pipa Galvanis 2" Medium A 120,775.00 1,290.85 362.33 122,428.17
7 Pipa Galvanis 1 1/2" Medium A 88,558.33 649.44 265.68 89,473.45
8 Pipa Galvanis 1 1/4" Medium A 67,550.00 501.89 202.65 68,254.54
9 Pipa Galvanis 1" Medium A 48,433.33 318.97 145.30 48,897.60
10 'Pipa Galvanis 1/2" Medium A 30,325.00 129.60 90.98 30,545.58
ANALISA BIAYA ANGKUTAN PIPA

PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA RATULODONG
LOKASI : DESA RATULODONG - KEC. TANJUNG BUNGA- KAB. FLORES TIMUR
T.A : 2023

Volume Panjang Pipa Panjang Total Biaya Kirim Biaya Kirim Biaya Kirim Biaya Kirim Total Biaya kirim
Container 20 Ft (Roll / Btg) / Container/Truck Dri Pabrik Ke Pel. Sby Dr Pelbh Sby dr Pelbh Sby ke Lokasi
No. Diameter
(Roll / Btg) (M') (M') Ke Pel. Sby (Rp./M') Ke Pel. Larantuka Ke Pel. Larantuka Sementara
(Rp./Truck) (Rp./ Container 20 Ft) (Rp./ M') (Rp.M')
1 2 3 4 5 = (4 x 3) 6 7= (6/5) 8 9 = (8/5) 10 = (9 + 7)

1 Pipa PE Ø 63 mm ( 2 inch ) Pn 16 27.72 Rol 100.00 2,771.68 1,000,000.00 360.79 11,000,000.00 3,968.72 4,329.51
2 Pipa PE Ø 50 mm ( 1 1/2 inch ) Pn 16 27.16 Rol 100.00 2,716.24 1,000,000.00 368.16 11,000,000.00 4,049.71 4,417.86
3 Pipa PE Ø 32 mm ( 1 inch ) Pn 16 53.71 Rol 200.00 10,742.96 1,000,000.00 93.08 11,000,000.00 1,023.93 1,117.01
4 Pipa PE Ø 25 mm ( 3/4 inch ) Pn 16 88.01 Rol 200.00 17,601.26 1,000,000.00 56.81 11,000,000.00 624.96 681.77
5 Pipa PE Ø 20 mm ( 1/2 inch ) Pn 16 137.51 Rol 200.00 27,501.97 1,000,000.00 36.36 11,000,000.00 399.97 436.33
6 Pipa Galvanis 2" Medium A 1,549.37 Btg 6.00 9,296.23 1,000,000.00 107.57 11,000,000.00 1,183.28 1,290.85
7 Pipa Galvanis 1 1/2" Medium A 3,079.59 Btg 6.00 18,477.54 1,000,000.00 54.12 11,000,000.00 595.32 649.44
8 Pipa Galvanis 1 1/4" Medium A 3,984.91 Btg 6.00 23,909.43 1,000,000.00 41.82 11,000,000.00 460.07 501.89
9 Pipa Galvanis 1" Medium A 6,270.19 Btg 6.00 37,621.11 1,000,000.00 26.58 11,000,000.00 292.39 318.97
10 'Pipa Galvanis 1/2" Medium A 15,431.91 Btg 6.00 92,591.45 1,000,000.00 10.80 11,000,000.00 118.80 129.60
ANALISA PANJANG PIPA DALAM KONTAINER
INSTANSI : DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT KABUPATEN FLORES TIMUR
PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM
KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA RATULODONG
LOKASI : DESA RATULODONG - KEC. TANJUNG BUNGA- KAB. FLORES TIMUR
TAHUN ANGGARAN : 2023

STANDARD SNI 16 - 4829 - 2005 / IS0 4427.96, S-5 SDR 11 (PN 16)
STANDARD SNI 07-0039-2010/BS 1387 - 1985/MEDIUM A

Panjang Pipa (M) Luasan Pipa Volume Container Jumlah Pipa (Roll)
No.
Jenis dan Ukuran Pipa Luas OD Per Roll Per Roll Kap. 20 Feet Dalam 1 Kontainer

A PIPA HDPE
1 Pipa PE. Ǿ 20 mm (1/2") (PN 16) 0.0013 200 0.25 137.51
2 Pipa PE. Ǿ 25 mm (3/4") (PN 16) 0.0020 200 0.39 88.01
3 Pipa PE. Ǿ 32 mm (1") (PN 16) 0.0032 200 0.64 53.71
34.56
4 Pipa PE. Ǿ 50 mm (1,5") (PN 16) 0.0079 100 0.79 44.00
5 Pipa PE. Ǿ 63 mm (2") (PN 16) 0.0125 100 1.25 27.72
6 Pipa PE. Ǿ 90 mm (3") (PN 16) 0.0254 50 1.27 27.16
Jumlah Batang Dalam 1
B PIPA GIP Kontainer
1 Pipa GIP Ø 2" Medium SNI 0.00372 6 1549.37
2 Pipa GIP Ø 1 1/2" Medium SNI 0.00187 6 3079.59
3 Pipa GIP Ø 1 1/4" Medium SNI 0.00145 6 3984.91
5.76
4 Pipa GIP Ø 1" Medium SNI 0.00092 6 6270.19
5 Pipa GIP Ø 3/4" Medium SNI 0.00059 6 9840.28
6 Pipa GIP Ø 1/2" Medium SNI 0.00037 6 15431.91
DAFTAR ANALISA BIAYA OPERASI PERALATAN

PROGRAM : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM


KEGIATAN : PENGELOLAAN DAN PENGEMBANGAN SISTEM PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN
PEKERJAAN : PENGEMBANGAN JARINGAN DISTRIBUSI DAN SAMBUNGAN RUMAH (SR) DESA RATULODONG
LOKASI : DESA RATULODONG - KEC. TANJUNG BUNGA- KAB. FLORES TIMUR
T.A : 2023

ANALISA BIAYA OPERASI PERALATAN


No. URAIAN KODE KOEFISIEN SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan EXCAVATOR
(Merk/Type Alat) KOMATSU
2. Tenaga Pw 140.00 HP
3. Kapasitas Cp -- --
4. Alat yang dipakai : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 tahun W 2,000.00 Jam
c. Harga Alat B 1,200,000,000.00 Rupiah

B. BIAYA PASTI PER JAM KERJA

1. Nilai Sisa Alat = 10 % x c C 120,000,000.00 Rupiah

2. Faktor Angsuran Modal = i x ( 1 + i ) ^ A'


D 0.26 -
( 1 + i ) ^ A - 1

Biaya Pasti Perjam :


a. Biaya Pengembalian Modal = ( B- C ) x D
E 142,450.64 Rupiah
W

b. Asuransi, dan Lain -Lain = 0.002 x B


F 1,200.00 Rupiah
W

Biaya Pasti Perjam = ( E + F ) G 143,650.64 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar =( 0.125 - 0.175 Ltr/Hp/Jam ) x Pw x Ms H 252,000.00 Rupiah

2. Pelumas =( 0.01 - 0.020 Ltr/Hp/Jam ) x Pw x Mp I 44,800.00 Rupiah

3. Perawatan dan Perbaikan = ( 12.5 %- 17.5 % ) x B


K 75,000.00 Rupiah
W
4. Operator =( 1 Orang / Jam ) x U1 L 90,000.00 Rupiah
5. Pembantu Operator =( 1 Orang / Jam ) x U2 M 70,000.00 Rupiah

Biaya Operasi Per Jam = ( H+ I + K + L+ M) P 531,800.00 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G +P ) S 675,450.64 Rupiah

E. LAIN - LAIN

Tingkat Suku Bunga i 10.00 % Tahun


Upah Operator / Sopir U1 90,000.00 Rp./jam
Upah Pembantu Operator / Pembantu Sopir U2 70,000.00 Rp./jam
Bahan Bakar Bensin Mb 12,000.00 Liter
Bahan Bakar Solar Ms 12,000.00 Liter
Minyak Pelumas Mp 32,000.00 Liter
ANALISA BIAYA OPERASI PERALATAN
No. URAIAN KODE KOEFISIEN SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan DUMP TRUCK
(Merk/Type Alat)
2. Tenaga Pw 100.00 HP
3. Kapasitas Cp -- --
4. Alat yang dipakai : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 tahun W 3,000.00 Jam
c. Harga Alat B 350,000,000.00 Rupiah

B. BIAYA PASTI PER JAM KERJA

1. Nilai Sisa Alat = 10 % x B C 35,000,000.00 Rupiah

2. Faktor Angsuran Modal = i x ( 1 + i ) ^ A'


D 0.26 -
( 1 + i ) ^ A - 1

Biaya Pasti Perjam :


a. Biaya Pengembalian Modal = ( B- C ) x D
E 27,698.74 Rupiah
W

b. Asuransi, dan Lain -Lain = 0.003 x B


F 350.00 Rupiah
W

Biaya Pasti Perjam = ( E + F ) G 28,048.74 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar =( 0.120 - 0.15 Ltr/Hp/Jam ) x Pw x Ms H 144,000.00 Rupiah

2. Pelumas =( 0.025 - 0.030 Ltr/Hp/Jam ) x Pw x Mp I 80,000.00 Rupiah

3. Perawatan dan Perbaikan = ( 0.125 %- 0.175 % ) x B


K 14,583.33 Rupiah
W
4. Sopir =( 1 Orang / Jam ) x U1 L 90,000.00 Rupiah
5. Pembantu Sopir =( 1 Orang / Jam ) x U2 M 70,000.00 Rupiah

Biaya Operasi Per Jam = ( H+ I + K + L+ M) P 398,583.33

D. TOTAL BIAYA SEWA ALAT / JAM = ( G +P ) S 426,632.07 Rupiah

E. LAIN - LAIN

Tingkat Suku Bunga i 10.00 % Tahun


Upah Operator / Sopir U1 90,000.00 Rp./jam
Upah Pembantu Operator / Pembantu Sopir/Pem.Mekanik U2 70,000.00 Rp./jam
Bahan Bakar Bensin Mb 12,000.00 Liter
Bahan Bakar Solar Ms 12,000.00 Liter
Minyak Pelumas Mp 32,000.00 Liter
ANALISA BIAYA OPERASI PERALATAN
No. URAIAN KODE KOEFISIEN SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan CONCRETE MIXER 350 LTR
(Merk/Type Alat) KUBOTA (MOLEN)
2. Tenaga Pw 10.00 HP
3. Kapasitas Cp 300.00 Liter
4. Alat yang dipakai : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 tahun W 2,000.00 Jam
c. Harga Alat B 10,000,000.00 Rupiah

B. BIAYA PASTI PER JAM KERJA

1. Nilai Sisa Alat = 10 % x B C 1,000,000.00 Rupiah

2. Faktor Angsuran Modal = i x ( 1 + i ) ^ A'


D 0.26 -
( 1 + i ) ^ A - 1

Biaya Pasti Perjam :


a. Biaya Pengembalian Modal = ( B- C ) x D
E 1,187.09 Rupiah
W

b. Asuransi, dan Lain -Lain = 0.002 x B


F 10.00 Rupiah
W

Biaya Pasti Perjam = ( E + F ) G 1,197.09 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar =( 0.100 - 0.175 Ltr/Hp/Jam ) x Pw x Ms H 12,000.00 Rupiah

2. Pelumas =( 0.01 - 0.020 Ltr/Hp/Jam ) x Pw x Mp I 3,200.00 Rupiah

3. Perawatan dan Perbaikan = ( 12.5 %- 17.5 % ) x B


K 625.00 Rupiah
W
4. Operator =( 1 Orang / Jam ) x U1 L 90,000.00 Rupiah
5. Pembantu Operator =( 1 Orang / Jam ) x U2 M 70,000.00 Rupiah

Biaya Operasi Per Jam = ( H+ I + K + L+ M) P 175,825.00 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G +P ) S 177,022.09 Rupiah

E. LAIN - LAIN

Tingkat Suku Bunga i 10.00 % Tahun


Upah Operator / Sopir U1 90,000.00 Rp./jam
Upah Pembantu Operator / Pembantu Sopir/Pem.Mekanik U2 70,000.00 Rp./jam
Bahan Bakar Bensin Mb 12,000.00 Liter
Bahan Bakar Solar Ms 12,000.00 Liter
Minyak Pelumas Mp 32,000.00 Liter
ANALISA BIAYA OPERASI PERALATAN
No. URAIAN KODE KOEFISIEN SATUAN KET.

A. URAIAN PERALATAN
1. Jenis Peralatan MESIN LAS PIPA
(Merk/Type Alat)
2. Tenaga Pw 5.00 HP
3. Kapasitas Cp -- --
4. Alat yang dipakai : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 tahun W 2,000.00 Jam
c. Harga Alat B 8,600,000.00 Rupiah

B. BIAYA PASTI PER JAM KERJA

1. Nilai Sisa Alat = 10 % x B C 860,000.00 Rupiah

2. Faktor Angsuran Modal = i x ( 1 + i ) ^ A'


D 0.26 -
( 1 + i ) ^ A - 1

Biaya Pasti Perjam :


a. Biaya Pengembalian Modal = ( B- C ) x D
E 1,020.90 Rupiah
W

b. Asuransi, dan Lain -Lain = 0.002 x B


F 8.60 Rupiah
W

Biaya Pasti Perjam = ( E + F ) G 1,029.50 Rupiah

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar =( 0.125 - 0.175 Ltr/Hp/Jam ) x Pw x Ms H 7,500.00 Rupiah

2. Pelumas =( 0.01 - 0.020 Ltr/Hp/Jam ) x Pw x Mp I 1,600.00 Rupiah

3. Perawatan dan Perbaikan = ( 12.5 %- 17.5 % ) x B


K 752.50 Rupiah
W
4. Operator =( 1 Orang / Jam ) x U1 L 90,000.00 Rupiah
5. Pembantu Operator =( 1 Orang / Jam ) x U2 M 70,000.00 Rupiah

Biaya Operasi Per Jam = ( H+ I + K + L+ M) P 169,852.50 Rupiah

D. TOTAL BIAYA SEWA ALAT / JAM = ( G +P ) S 170,882.00 Rupiah

E. LAIN - LAIN

Tingkat Suku Bunga i 10.00 % Tahun


Upah Operator / Sopir U1 90,000.00 Rp./jam
Upah Pembantu Operator / Pembantu Sopir U2 70,000.00 Rp./jam
Bahan Bakar Bensin Mb 12,000.00 Liter
Bahan Bakar Solar Ms 12,000.00 Liter
Minyak Pelumas Mp 32,000.00 Liter