TOTAL BIAYA
NO. URAIAN PEKERJAAN
( Rp )
1 2 3
1 PEKERJAAN PERSIAPAN Rp 368,903,332
2 SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA Rp 8,940,000
3 PEKERJAAN KOLAM RETENSI Rp 2,220,031,470
4 PEKERJAAN TANGGUL KOLAM Rp 3,894,588,339
5 PEKERJAAN PINTU AIR Rp 32,408,032
6 PEKERJAAN JALAN INSPEKSI Rp 1,027,903,109
7 PEKERJAAN NORMALISASI SALURAN Rp 10,322,210,322
8 PEKERJAAN SHEEPILE BETON PRE-CAST Rp 2,966,146,818
JUMLAH BIAYA FISIK Rp 20,841,131,423
PAJAK PERTAMBAHAN NILAI (11%) Rp 2,292,524,457
JUMLAH BIAYA FISIK + PPN 11 % Rp 23,133,655,879
TOTAL PEMBULATAN 23,133,656,000
REKAPITULASI RENCANA ANGGARAN BIAYA
DED PENGENDALIAN BANJIR KP PISANG & KP KUALA LUMPUR
KABUPATEN BINTAN, PROVINSI KEPULAUAN RIAU
TOTAL BIAYA
NO. URAIAN PEKERJAAN
( Rp )
1 2 3
1 PEKERJAAN PERSIAPAN Rp 368,903,332
2 SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA Rp 8,940,000
3 PEKERJAAN KOLAM RETENSI Rp 2,220,031,470
4 PEKERJAAN TANGGUL KOLAM Rp 3,098,595,261
5 PEKERJAAN PINTU AIR Rp 32,408,032
6 PEKERJAAN JALAN INSPEKSI Rp 966,572,929
7 PEKERJAAN NORMALISASI SALURAN Rp 79,271,500
JUMLAH BIAYA FISIK Rp 6,774,722,524
PAJAK PERTAMBAHAN NILAI (11%) Rp 745,219,478
JUMLAH BIAYA FISIK + PPN 11 % Rp 7,519,942,002
TOTAL PEMBULATAN 7,519,943,000
RENCANA ANGGARAN BIAYA
Lembar 1.2-1
HARGA JUMLAH
No. URAIAN SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)
A PERALATAN
Periksa lembar 1.2-2 23,000,000.00
B MOBILISASI PERSONIL
E.I. Personil Sesuai Struktur Organisasi Ls 1.00 5,000,000.00 5,000,000.00
1 - Pelaksana Lapangan
2 - Surveyor
3 - Pekerja ....
C Lain - Lain
1 Komunikasi Lapangan Lengkap Ls 1.00 600,000.00 600,000.00
2 Papan Nama Proyek Buah 1.00 350,000.00 350,000.00
3 Dokumen PCM, Pelaporan (Lap. Harian, Mingguan, Bulanan), Sertifikat Set 5.00 950,000.00 4,750,000.00
Bulanan, Back Up Data, Foto Dokumentasi, Dokumen Peneliti Kontrak,
Dokumen Addendum Dok Kontrak, Dokumen Serah Terima Pekerjaan dan lain-
lain
4 Shop Drawing & As Built Drawing Set 5.00 550,000.00 2,750,000.00
5 Pengukuran/Rekayasa lapangan Ls 1.00 3,000,000.00 3,000,000.00
Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI
Lembar 1.2-2
KODE HARGA JUMLAH
No. JENIS ALAT ALAT SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)
B. PERALATAN
T.01.b 1 m² tebas tebang berupa memotong dan membersihkan lokasi dari tanaman/
tumbuhan diam. < 15 cm
HARGA JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA
( Rp. ) (Rp)
A TENAGA KERJA
1 Pekerja L.01 OH 0.0750 Rp 110,000.00 Rp 8,250.00
2 Mandor L.04 OH 0.0075 Rp 250,000.00 Rp 1,875.00
Jumlah Tenaga Kerja 10,125.00
B BAHAN
1 Minyak tanah M.130 liter 0.0100 16,485.12 164.85
Jumlah Harga Bahan 164.85
C PERALATAN
B.17.b Untuk pembesian kolom, balok, ring balk dan sloof,tulangan angkur,kisi-kisi sampah
HARGA JUMLAH
NO. URAIAN KODE SATUAN KOEFISIEN SATUAN HARGA
( Rp. ) (Rp)
A TENAGA
1 Pekerja L.01 OH 2.1000 Rp 110,000.00 Rp 231,000.00
2 Tukang besi L.02 OH 1.4000 Rp 150,000.00 Rp 210,000.00
3 Kepala tukang besi L.03 OH 0.1400 Rp 200,000.00 Rp 28,000.00
4 Mandor L.04 OH 0.2100 Rp 250,000.00 Rp 52,500.00
Jumlah Tenaga Kerja 521,500.00
B BAHAN
1 Besi beton polos/ulir M.55.d kg 105.000 Rp 14,953.27 Rp 1,570,093.46
2 Kawat beton M.67 kg 2.100 Rp 18,800.00 Rp 39,480.00
Jumlah Harga Bahan 1,609,573.46
C PERALATAN
1 2 4 5 6 7
A. Tenaga Kerja
1 Pekerja OH 1.20 110,000.00 132,000.00
2 Tukang Tembok/batu OH 0.40 150,000.00 60,000.00
3 Kepala tukang batu OH 0.04 200,000.00 8,000.00
4 Mandor OH 0.12 250,000.00 30,000.00
Jumlah Harga Tenaga Kerja 230,000.00
B. Bahan
1 Kaso 5/7 m3 0.35 1,550,000.00 542,500.00
2 Dinding triplek 4mm lbr 1.00 73,922.00 73,922.00
3 Fondasi pas. Batu m3 0.17 1,311,832.00 216,452.28
5 Plafon asbes 3 mm (1x1 m) lbr 1.24 31,300.00 38,812.00
6 Paku kg 0.75 32,400.00 24,300.00
7 Asbes gelombang lbr 0.30 77,169.18 23,150.75
8 Paku asbes kg 0.10 32,400.00 3,240.00
9 Floor lantai (Beton lantai kerja) m3 0.15 1,112,780.80 166,917.12
10 Pintu double teakwood rangka kayu m2 0.10 824,000.00 82,400.00
11 Jendela kaca nako daun 1.00 292,200.00 292,200.00
Jumlah Harga Bahan 1,463,894.15
C Peralatan
Jumlah Harga Peralatan 0
D Jumlah harga tenaga, bahan dan peralatan ( A + B + C ) 1,693,894.15
E Overhead & profit (Contoh 15%) 15% x D 254,084.12
F Harga satuan pekerjaan per - m2( D + E ) 1,947,978.28
DAFTAR HARGA SATUAN PEKERJAAN
DED PENGENDALIAN BANJIR KAMPUNG PISANG
KABUPATEN BINTAN, PROVINSI KEPULAUAN RIAU
DAFTAR HARGA SATUAN BAHAN
a.
DAFTAR HARGA SATUAN BAHAN
Harga Satuan
No. Jenis Bahan Satuan Referensi
( Rp )
a.
DAFTAR HARGA SATUAN SEWA ALAT
Harga Satuan
No. Jenis Alat Satuan Referensi
( Rp )
Sewa Tongkang/LCT hari Rp 41,829,291
A.1 Ponton Pancang hari Rp 7,668,703
A.2 Ponton Transport hari Rp 16,210,479
A.3 Tug Boat hari Rp 5,746,784
A.4 Crawler crane hari Rp 6,515,466
A.5 Mobile crane hari Rp 4,811,489
A.6.1Crane 25 ton hari Rp 4,689,337
A.7 Diesel Hammer K-42 hari Rp 2,760,733
A.7.1Diesel Hammer K 40 hari Rp 3,257,733
A.8 Waterpass hari Rp 3,194,637
A.20 Theodolite hari Rp 2,889,818
A.21 Alat survey (GPS & Total Station) hari Rp 4,479,643
A.10 Mesin las listrik hari Rp 27,886,194
A.11 Genset 10 kVa hari Rp 1,673,172
A.11.1Genset 20 kVa hari Rp 2,230,896
A.12 Concrete Mixer hari Rp 1,491,911
A.15 Concrete Vibrator hari Rp 1,533,741 PM 78 TAHUN 2014 dikalikan dengan faktor
A.16 Compresor hari Rp 991,393 kemahalan Kab Bintan (1,0263) dan inflasi
A.17 Bar Bender hari Rp 296,180
A.18 Bar Cutter hari Rp 283,579
A.19 Stamper untuk pemadat hari Rp 1,003,903
A.22 Bulldozer hari Rp 2,557,568
A.23 Excavator hari Rp 3,904,067
A.24 Vibro Roller 6-8 ton hari Rp 7,365,786
Vibro Hammer hari Rp 11,037,199
Dump Truck 3.5 ton hari Rp 1,673,172
A.25 Dump Truck 5 ton hari Rp 2,091,465
A.25.2Dump Truck 10 ton hari Rp 2,509,757
A.26 Tandem Roller hari Rp 2,798,002
A.27 Motor Grader hari Rp 2,914,759
A.28 Water Tanker hari Rp 749,435
A.29 Wheel Loader hari Rp 6,061,989
A.37 Asphalt Liquid Mixer hari Rp 3,904,067
A.41 Alat bantu pengukuran hari Rp 1,115,448
A.38 Scafolding hari Rp 1,032,910
Rp 20,225,127
PERHITUNGAN VOLUME GALIAN SALURAN DRAINASE
b1 b2 h p
SL1a 3.3 1.3 1.9 151
SL1 3.3 1.3 1.9 70
SL2 3.8 1.8 1.9 158
SL3 4.3 2.4 2.2 43
SL6a 5.3 3.9 2.4 455
SL6 4.8 3.4 2.2 70
SL7 3.3 1.4 2.2 101
SL9 3.3 1.4 2.2 484
SL11 3.6 1.3 1.9 146
SL13 3.6 1.3 1.9 54
SL14 6.8 5.4 3.2 141
b1 b2 h p
SL1a 1.5 0.9 1.7 151
SL1 1.5 0.9 1.7 70
SL2 2 1.4 1.7 120
SL3 2.5 2 2 43
SL6a 3.5 3.5 2.2 455
SL6 3 3 2 70
SL7 1.5 1 2 101
SL9 1.5 1 2 484
SL11 1.8 0.9 1.7 146
SL13 1.8 0.9 1.7 54
SL14 5 5 3 141
1835
b1 b2 h p
SL1a 0.2 0.5 1.7 151
SL1 0.2 0.5 1.7 70
SL2 0.2 0.5 1.7 120
SL3 2.5 2 2 43
SL6a 0.2 0.2 2.2 455
SL6 0.2 0.2 2 70
SL7 0.2 0.45 2 101
SL9 0.2 0.45 2 484
SL11 0.2 0.65 1.7 146
SL13 0.2 0.65 1.7 54
SL14 0.2 0.2 3 141
Volume Kolam
Luas
JumlahL
Elev Permukaan Tinggi H (m) Volume (m3)
uas (m2)
(m2)
1 34727
70912 1.5 35589.15
2.5 36185
74337 0 0
2.5 38152
77795 1.5 39036.96
4 39643
Luas
JumlahL
Elev Permukaan Tinggi H (m) Volume (m3)
uas (m2)
(m2)
1 24308.9
49638.4 1.5 24930.6
2.5 25329.5
52035.9 0 0
2.5 26706.4
54456.5 1.5 27344.93
4 27750.1
RAINASE
eton total
85
5
2
3
9
2
1
4
85
15
6
3,742.675 m3
3,181,273,750.000 5,410,485,154.970
Volume Kumulatif
Volume Kumulatif (m3)
(1000 m3)
0.00 0.00
35589.15 35.59
35589.15 35.59
74626.11 74.63
Volume Kumulatif
Volume Kumulatif (m3)
(1000 m3)
0.00 0.00
24930.60 24.93
24930.60 24.93
52275.53 52.28
PERHITUNGAN VOLUME GALIAN SALURAN DRAINASE