JUMLAH 220,736,327.60
PPN 10% 22,073,632.76
TOTAL JUMLAH 242,809,960.36
DIBULATKAN 250,000,000.00
Terbilang : Dua Ratus Lima Puluh Juta Rupiah
I PEKERJAAN PERSIAPAN
1 Persiapan Ls 1.00 - -
Pipa
RENCANA ANGGARAN BIAYA
KEGIATAN : PEMBANGUNAN SARANA AIR BERSIH DI PERDESAAN
PEKERJAAN : PEMBUATAN GROUND RESERVOIR
LOKASI DESA TENONAN KEC. MANDING KAB. SUMMENEP
TAHUN ANGGARAN : 2013
I PEKERJAAN PERSIAPAN
1 Pembersihan lokasi M2 36.00 - -
2 Pasang Bauwplank M' 30.00 - -
II PEKERJAAN TANAH
1 Pekerjaan galian biasa M3 36.00 - -
2 Urugan tanah kembali M3 10.80 - -
3 Urugan pasir M3 2.81 - -
IV PEKERJAAN PIPA
4.1 Pipa Outlet
1 Wall pipa all flange Ø 3" x 50 Bh 1.00 - -
2 All flange gate valve Ø 3" Bh 2.00 - -
3 Tee all flange GI Ø 3 x 3" Bh 1.00 - -
4 Pipa sreen Ø 3" Bh 1.00 - -
5 Flange socked PVC Ø 3" Bh 2.00 - -
6 Box valve (lengkap) Bh 1.00 - -
V PEKERJAAN LAIN-LAIN
1 Tangga monyet Ls 2.00 - -
2 Fentilasi Udara Ø 2" Ls 1.00 - -
3 Manhole Bh 1.00 - -
4 Pengecatan biru M2 30.60 - -
VI PEKERJAAN PENYELESAIAN
1 Penyelesaian (Perapian) Ls 1.00 - -
Ground
RENCANA ANGGARAN BIAYA
KEGIATAN : PEMBANGUNAN SARANA AIR BERSIH DI PERDESAAN
PEKERJAAN : MEKANICHAL ELEKTRIKAL
LOKASI : BANGUN JAYA
TAHUN ANGGARAN : 2013
I PEKERJAAN POMPA
1 Pompa Multistage Submersible Unit 1.00 - -
H = 80 m
Q = 5 l/d
P = 7.5 Kw
= 10 PK
V = 380 Volt 3 fas
2 Panel lengkap 7.5 Kw Bh 1.00 - -
3 Kabel NYY 4 x 4 mm M' 60.00 - -
4 Pengadaan listrik PLN 16 KVA Ls 1.00 - -
ME
RENCANA ANGGARAN BIAYA
Jumlah Jumlah
NO. Jenis Pekerjaan Analisa Volume Satuan Harga Satuan
APBN InKind
PEMBANGUNAN SUMUR BOR
1 Pengeboran Sumur dalam dengan kedalaman +/- 80 m
( termasuk survey dan perijinan, mobilisasi alat,
pengetesan kualitas sumber air, dan sistem kontrol )
'- Pengeboran dari 0 - 30 M SB.13 30.00 m' 420,587.25 12,617,618
'- Pengeboran dari 30 - 60 M SB. 14 30.00 m' 427,087.25 12,812,618
'- Pengeboran dari 60 - 90 M SB. 15 30.00 m' 433,587.25 13,007,618
2 Pengadaan dan pemasangan pipa AW Ø 6" J. 36 40.00 m' 42,218.50 1,688,740
3 Pengadaan dan pemasangan pipa AW Ø 4" J. 32 40.00 m' 31,656.00 1,266,240
4 Pengadaan dan pemasangan pipa sedot AW Ø 2" J. 33 50.00 m' 16,868.50 843,425
5 Sock drat Luar 2" Ls 12.00 Bh 50,000.00 600,000
6 Sock drat dalam 2" Ls 12.00 Bh 50,000.00 600,000
7 Electrikal logging test ( penentuan posisi screen ) 1.00 Ls 1,500,000.00 1,500,000
8 Pengadaan dan peralatan assesories (cek valve Ø 75 mm, 1.00 Ls 2,300,000.00 2,300,000
bend giv 50 - 75 mm, dan elektroda lengkap )
9 Pemasangan gravel / saringan untuk screen SB. 12 1.45 m3 330,460.00 479,167
10 Penyemenan lobang sumur dan cassing G. 41 1.00 m3 1,062,695.00 1,062,695
11 Pompa Air Summersible 1 Pk + assesories 1.00 unit 2,800,000.00 2,800,000
12 Pengadaan Genset dan Pemasangan Lengkap 1.00 unit 7,050,000.00 7,050,000
JUMLAH TOTAL SATU UNIT 58,628,120
Dana BLM / APBN 58,628,120
Sumber Dana
Swadaya / InKind -
Harga Jumlah
No. Jenis Pekerjaan Analisa Volume Satuan Jumlah APBN
Satuan InKind
PEMBANGUNAN MENARA AIR, H = 6,5 M
1 Galian tanah A.2 7.98 M3 21,800 173,964
2 Urugan kembali A.16 2.66 M3 10,355 27,544
3 Urugan Pasir A.18 0.24 M 3
200,950 48,228
4 Beton Tumbuk, Campuran 1 Pc : 3 Ps : 5 Kr G.44 0.48 M 3
864,210 414,821
5 Pondasi plat tapak G.43a 1.58 M 3
5,426,448 8,573,787
6 Sloof 20 / 30 G.43a 0.54 M 3
5,426,448 2,930,282
7 Pekerjaan Plesteran G.50q 0.36 M 2
34,599 12,456
8 Besi siku 70 x 70 x 7 12.00 Batang 150,000 1,800,000
9 Besi siku 60 x 60 x 6 12.00 Batang 129,500 1,554,000
10 Besi siku 50 x 50 x 5 4.00 Batang 107,500 430,000
11 Plat simpul t = 4 mm 150.00 Kg 20,000 3,000,000
12 Plat tapak t = 12 mm 50.00 Kg 20,000 1,000,000
13 Mur baut Ø 12 mm + ring 128.00 Bh 5,000 640,000
14 Mur baut + ring Ø 12 x 30 cm 16.00 Bh 25,000 400,000
15 Memasang pipa PVC Ø 1 1/4 " 12.79 M' 31,918 408,236
16 Tee PVC Ø 1 1/4 " 3.00 Bh 17,500 52,500
17 Elbow PVC Ø 1 1/4 " 5.00 Bh 17,500 87,500
18 Socet PVC Ø 1 1/4 " 7.00 Bh 22,500 157,500
19 Memasang pipa PVC Ø 1 1/2 " 13.08 M' 47,750 624,570
20 Tee PVC Ø 1 1/2 " 1.00 Bh 18,500 18,500
21 Elbow PVC Ø 1 1/2 " 5.00 Bh 18,500 92,500
22 Socet PVC Ø 1 1/2 " 2.00 Bh 24,000 48,000
23 Memasang pipa PVC Ø 3/4 " J. 35 1.72 M' 12,481 21,467
24 Kran air Ø 1/2" 3.00 Bh 48,313 144,939
22,660,793 -
Dana BLM / APBN 22,660,700
Sumber Dana
Swadaya / InKind -
JUMLAH JUMLAH
NO JENIS PEKERJAAN ANALISA SATUAN KUANTITAS HARGA SATUAN HARGA HARGA
APBN ( Rp ) INKIND (Rp)
II PEKERJAAN PASANGAN
1 Pasangan pondasi batu kali 1pc : 6 ps G.36 H m2 0.78 812,805.00 630,736.68
V PEKERJAAAN PERPIPAAN
1 Pipa PVC Ø 3/4" J.35 m' 3.00 12,481.00 37,443.00
2 Pipa PVC Ø 1.5" m' 0.40 47,750.00 19,100.00
3 Socket PVC Ø 3/4" bh 2.00 15,000.00 30,000.00
4 Tee PVC Ø 3/4" bh 3.00 10,000.00 30,000.00
5 Kran air Ø 3/4" bh 4.00 48,312.50 193,250.00
6 Elbow PVC Ø 3/4" bh 2.00 10,000.00 20,000.00
I BAHAN
1. Usuk M3 0.003 - -
2. Papan cor M3 0.007 - -
3. Paku Kg 0.060 22,000.00 1,320.00
II TENAGA
1. Pekerja Org/Hr 0.010 45,000.00 450.00
2. Tukang Kayu Org/Hr 0.002 67,500.00 135.00
3. Kepala Tukang Kayu Org/Hr 0.002 70,000.00 140.00
4. Mandor Org/Hr 0.002 70,000.00 140.00
2,185.00
URAIAN PEKERJAAN : 1 M2 PEMBERSIHAN (HSPK.III.2-14)
I TENAGA
1. Pekerja Org/Hr 0.050 45,000.00 2,250.00
2. Mandor Org/Hr 0.008 70,000.00 560.00
2,810.00
URAIAN PEKERJAAN : 1 M3 GALIAN TANAH BIASA (HSPK-III.2-01)
I TENAGA
1. Pekerja Org/Hr 0.400 45,000.00 18,000.00
2. Mandor Org/Hr 0.040 70,000.00 2,800.00
20,800.00
URAIAN PEKERJAAN : 1 M3 GALIAN TANAH BERBATU (HSPK-III.20-04)
I TENAGA
1. Pekerja Org/Hr 1.000 45,000.00 45,000.00
2. Mandor Org/Hr 0.030 70,000.00 2,100.00
47,100.00
URAIAN PEKERJAAN : 1 M3 PENGURUGAN TANAH KEMBALI (HSPK-III.2-05)
I TENAGA
1. Pekerja Org/Hr 0.192 45,000.00 8,640.00
2. Mandor Org/Hr 0.019 70,000.00 1,330.00
9,970.00
URAIAN PEKERJAAN : 1 M3 URUGAN PASIR (PADAT) (HSPK-III.2-07)
I BAHAN
1. Pasir Urug M3 1.200 155,000.00 186,000.00
II TENAGA
1. Pekerja Org/Hr 0.300 45,000.00 13,500.00
2. Mandor Org/Hr 0.010 70,000.00 700.00
200,200.00
URAIAN PEKERJAAN : 1 M3 PASANGAN BATU KALI 1 PC : 4 PS (HSPK-III.3-04)
I BAHAN
1. Batu Belah/Batu Kali (15/20) M3 1.100 330,000.00 363,000.00
2. Pasir Pasang M3 0.520 190,000.00 98,800.00
3. PC (50 Kg) Zak 3.260 74,000.00 241,240.00
II TENAGA
1. Tukang Batu Org/Hr 0.600 67,500.00 40,500.00
2. Kepala Tukang Batu Org/Hr 0.060 70,000.00 4,200.00
3. Pekerja Org/Hr 1.500 45,000.00 67,500.00
4. Mandor Org/Hr 0.075 70,000.00 5,250.00
820,490.00
URAIAN PEKERJAAN : 1 M3 PASANGAN BATU KALI KOSONG (HSPK-III.3-13)
I BAHAN
1. Batu Belah/Batu Kali 15/20 Cm M3 1.200 330,000.00 396,000.00
2. Pasir Urug M3 0.300 155,000.00 46,500.00
II TENAGA
1. Pekerja Org/Hr 0.780 45,000.00 35,100.00
2. Mandor Org/hr 0.039 70,000.00 2,730.00
3. Tukang Batu Org/hr 0.390 67,500.00 26,325.00
4. Kepala Tukang Batu Org/hr 0.039 70,000.00 2,730.00
509,385.00
ANA-HS
URAIAN PEKERJAAN : 1 M2 PLESTERAN 1 PC : 4 PS TEBAL 15 MM (HSPK-III.6-04)
I BAHAN
1. Pasir M3 0.020 190,000.00 3,800.00
2. PC (50 Kg) Zak 0.104 74,000.00 7,696.00
II TENAGA
1. Tukang Batu Org/Hr 0.150 67,500.00 10,125.00
2. Kepala Tukang Batu Org/Hr 0.015 70,000.00 1,050.00
3. Pekerja Org/Hr 0.200 45,000.00 9,000.00
4. Mandor Org/Hr 0.010 70,000.00 700.00
32,371.00
URAIAN PEKERJAAN : 1 M2 SIARAN 1 PC : 2 PS (HSPK-III.6-11)
I BAHAN
1. Pasir M3 0.016 190,000.00 3,040.00
2. PC (50 Kg) Zak 0.086 74,000.00 6,364.00
II TENAGA
1. Tukang Batu Org/Hr 0.070 67,500.00 4,725.00
2. Kepala Tukang Batu Org/Hr 0.007 70,000.00 490.00
3. Pekerja Org/Hr 0.150 45,000.00 6,750.00
4. Mandor Org/Hr 0.006 70,000.00 420.00
21,789.00
URAIAN PEKERJAAN : 1 M3 RABAT BETON 1 : 3 : 5 (HSPK-III.8-01)
I BAHAN
1. Batu Kerikil Bh 0.870 375,000.00 326,250.00
2. Pasir Cor M3 0.520 185,000.00 96,200.00
3. PC (50 Kg) Zak 4.360 74,000.00 322,640.00
II TENAGA
1. Tukang Batu Org/Hr 0.250 67,500.00 16,875.00
2. Kepala Tukang Batu Org/Hr 0.025 70,000.00 1,750.00
3. Pekerja Org/Hr 1.650 45,000.00 74,250.00
4. Mandor Org/Hr 0.080 70,000.00 5,600.00
843,565.00
URAIAN PEKERJAAN : 1 M3 MEMBUAT BETON BERTULANG (110 Kg BESI + BEGISTING)
(HSPK-III.8-14)
I BAHAN
1. Kayu Terentang M3 0.240 - -
2. Paku Kg 0.750 22,000.00 16,500.00
3. Minyak Bigisting Ltr 1.600 - -
4. Besi Beton Kg 110.00 19,500.00 2,145,000.00
5. Kawat Beton Kg 2.250 34,000.00 76,500.00
6. PC (50 Kg) Zak 6.460 74,000.00 478,040.00
7. Pasir Beton M3 0.520 185,000.00 96,200.00
8. Koral Beton M3 0.780 375,000.00 292,500.00
9. Kayu Balok M3 0.060 -
10. Plywood 9 mm Lbr 2.800 - -
11. Dolken uk 8 cm / 4 cm Btg 12.00 - -
II TENAGA
1. Tukang Batu Org/Hr 0.350 67,500.00 23,625.00
2. Tukang Kayu Org/Hr 2.640 67,500.00 178,200.00
3. Tukang Besi Org/Hr 1.0500 67,500.00 70,875.00
4. Pekerja Org/Hr 5.600 45,000.00 252,000.00
5. Mandor Org/Hr 0.193 70,000.00 13,510.00
6. Kepala Tukang Org/Hr 0.400 70,000.00 28,000.00
3,670,950.00
URAIAN PEKERJAAN : 1 M2 PENGECATAN BIDANG TEMBOK BARU (1 LAPIS PLAMIR, 1 LAPIS CAT DASAR,
2 LAPIS PENUTUP) (HSPK-III.10-12)
I BAHAN
1. Plamir Ltr 0.100 - -
2. Cat Dasar Kg 0.100 - -
3. Cat Penutup 2 Kali Kg 0.260 - -
II TENAGA
1. Tukang Cat Org/Hr 0.063 67,500.00 4,252.50
2. Pekerja Org/Hr 0.020 45,000.00 900.00
3. Mandor Org/Hr 0.0025 70,000.00 175.00
5,768.50
URAIAN PEKERJAAN : 1 M' PENGADAAN DAN PEMASANGAN PIPA PVC Ø 3"
1. Pipa M' 1.000 - -
2. Galian Tanah M3 0.210 47,100.00 9,891.00
3. Urugan Tanah Kembali M3 0.210 9,970.00 2,093.70
4. Urugan Pasir M3 0.045 -
5. Pemasangan Pipa M' 1.000 807.92 807.92
6. Pencucian & pengetesan M' 1.000 - -
12,792.62
URAIAN PEKERJAAN : 1 M' PENGADAAN DAN PEMASANGAN PIPA PVC Ø 2"
1. Pipa M' 1.000 - -
2. Galian Tanah M3 0.180 47,100.00 8,478.00
3. Urugan Tanah Kembali M3 0.180 9,970.00 1,794.60
4. Pemasangan Pipa M' 1.000 581.25 581.25
10,853.85
ANA-HS
URAIAN PEKERJAAN : 1 M' PENGADAAN DAN PEMASANGAN PIPA GI Ø 3"
1. Pipa M' 1.000 - -
2. Pemasangan Pipa M' 1.000 - -
3. Alat bantu M' 1.000 - -
-
URAIAN PEKERJAAN : PEMASANGAN STRAT POT Ø 3"
I BAHAN
1. Strat Pot Bh 1.00 - -
2. Galian Tanah M3 0.200 47,100.00 9,420.00
3. Urugan Tanah Kembali M3 0.125 9,970.00 1,246.25
4. Beton Cor M3 0.040 843,565.00 33,742.60
44,408.85
URAIAN PEKERJAAN : PEMASANGAN BOX VALVE (60Cm x 60 Cm)
I BAHAN
1. Galian Tanah M3 0.648 47,100.00 30,520.80
2. Urugan Tanah Kembali M3 0.194 9,970.00 1,934.18
3. Beton Cor 1 : 2 : 3 M3 0.640 843,565.00 539,881.60
5. Batu Bata 1 : 4 M2 1.920 81,820.00 157,094.40
6. Plesteran M2 1.440 32,371.00 46,614.24
7. Urugan Kerikil 5 cm M3 0.018 - -
9. Tutup Box Valve Bh 1.000 - -
10. Gembok Bh 1.000 3,040.00 3,040.00
11. Cat Biru Ls 1.000 6,364.00 6,364.00
12. Besi L 50x50x5 mm Btg 1.000 - -
13. Baut Angkur Besi 8 mm Bh 2.000 4,725.00 9,450.00
II TENAGA 490.00
1. Pekerja Org/Hr 0.036 45,000.00 1,620.00
2. Tukang Pipa Org/Hr 0.004 67,500.00 243.00
3. Kepala Tukang Pipa Org/Hr 0.288 70,000.00 20,160.00
4. Mandor Org/Hr 0.014 70,000.00 1,008.00
817,930.22
URAIAN PEKERJAAN : PEMASANGAN TRUST BLOK PIPA
I BAHAN
1. Galian Tanah M3 0.162 -
2. Beton M3 0.091 3,670,950.00 334,056.45
3. Ankur + baut Bh 2.000 - -
4. Plat Strip Bh 1.000 - -
II TENAGA 2,960.00
1. Pekerja Org/Hr 0.036 - -
2. Tukang Pipa Org/Hr 0.030 67,500.00 2,025.00
3. Kepala Tukang Pipa Org/Hr 0.018 70,000.00 1,260.00
4. Mandor Org/Hr 0.001 70,000.00 70.00
337,411.45
URAIAN PEKERJAAN : PEMASANGAN TRUST BLOK Pipa GI Ø 2" - 1.5"
I BAHAN
1. Galian Tanah M3 0.018 47,100.00 847.80
2. Beton M3 0.024 375,000.00 9,000.00
3. Ankur + baut Bh 2.000 185,000.00 370,000.00
4. Plat Strip Bh 1.000 74,000.00 74,000.00
II TENAGA
1. Pekerja Org/Hr 0.036 45,000.00 1,620.00
2. Tukang Pipa Org/Hr 0.004 67,500.00 243.00
3. Kepala Tukang Pipa Org/Hr 0.288 70,000.00 20,160.00
4. Mandor Org/Hr 0.014 70,000.00 1,008.00
III ALAT
1. Mollen Hari 0.003 - -
2. Begisting M2 0.009 496,857.75 4,471.72
IV LAIN-LAIN
1. Ongkos angkut Ls 1.000 - -
2. Ankur Bh 1.000 - -
481,350.52
ANA-HS
SUB ANALISA HARGA SATUAN
URAIAN PEKERJAAN : PEKERJAAN ANGKUTAN PIPA DARI BASE CAMP-KE LOKASI /6 M' > 100 M
PIPA PVC Ø 1.5" - 2" (DISKIM)
I UPAH
1. Pekerja Org/Hr 0.0690 45,000.00 3,105.00
2. Mandor Org/Hr 0.0345 70,000.00 2,415.00
ANA-HS
DAFTAR HARGA BAHAN DAN UPAH PEKERJA
PROGRAM : PAM - STBM
KEGIATAN : TULANG BAWANG BARAT
PEKERJAAN : GUNUNG AGUNG
LOKASI : BANGUN JAYA
TAHUN ANGGARAN : 2014
HARGA JUMLAH
Kode
URAIAN PEKERJAAN KOEF Satuan BAHAN/UPAH TOTAL
Analisa
( Rp ) ( Rp )
1 m3 Urugan kembali
A.16 Mandor 0.0190 Oh 70,000.00 1,330.00
Pekerja 0.1900 Oh 47,500.00 9,025.00
10,355.00
1 m3 Urugan Pasir
Pasir urug 1.2000 m3 155,000.00 186,000.00
A.18
Mandor 0.0100 Oh 70,000.00 700.00
Pekerja 0.3000 Oh 47,500.00 14,250.00
200,950.00
1 M2 Pengecatan tembok baru ( 1 lapis plamir, 1 lapis cat dasar & 2 lapis
cat penutup )
Plamir tembok 0.1000 Kg 40,000.00 4,000.00
Cat dasar 0.1000 Kg 24,500.00 2,450.00
Supl. IX.a Cat penutup 2 x 0.2600 Kg 24,500.00 6,370.00
Pekerja 0.0200 Oh 47,500.00 950.00
Tukang cat 0.0630 Oh 67,500.00 4,252.50
Kepala Tukang 0.0063 Oh 70,000.00 441.00
Mandor 0.0025 Oh 70,000.00 175.00
18,638.50
ANALISA HARGA & KEBUTUHAN BAHAN DAN UPAH
PEKERJAAN PIPA
9,710.50
1bh pemasangan accessories pipa ø 32 mm
Galian tanah 0.125 m3 21,800.00 2,725.00
J.26 b urugan tanah kembali 0.100 m3 10,355.00 1,035.50
Thrust block 0.007 m3 864,210.00 5,833.42
9,593.92
1bh pemasangan accessories pipa ø 50 mm
Galian tanah 0.392 m3 21,800.00 8,545.60
J.28 b urugan tanah kembali 0.314 m3 10,355.00 3,247.33
Thrust block 0.019 m3 864,210.00 16,203.94
27,996.87
1 m panjang pipa - Biaya angkut / langsiran
Pekerja 0.038 Hok 47,500.00 1,781.25
1,781.25
DAFTAR HARGA SATUAN PEKERJAAN
( ANALISA SUMUR BOR )
AN JUMLAH
UPAH BAHAN ALAT TOTAL
(Rp) (Rp) (Rp) (Rp)
4 5 6 8
34,532.50 - -
82,740.00 - -
4,927.50 - -
8,260.00 - -
- 150,000.00 -
- - 50,000.00
130,460.00 150,000.00 50,000.00 330,460.00
195.00 - -
1,610.00 - -
2,850.00 - -
210.00 - -
- 13,000.00 -
- - 60,448.50
- - 89,082.00
- - 1,191.75
- 252,000.00
4,865.00 13,000.00 402,722.25 420,587.25
195.00 - -
1,610.00 - -
2,850.00 - -
210.00 - -
- 19,500.00 -
- - 60,448.50
- - 89,082.00
- - 1,191.75
- 252,000.00 -
4,865.00 271,500.00 150,722.25 427,087.25
195.00 - -
1,610.00 - -
2,850.00 - -
210.00 - -
- 26,000.00 -
- - 60,448.50
- - 89,082.00
- - 1,191.75
- 252,000.00 -
4,865.00 278,000.00 150,722.25 433,587.25
ANALISA SATUAN PEKERJAAN
SUMUR BOR (SNI)
KODE ANALISA MACAM PEKERJAAN
(1) (2)
510,720.00
108,000.00
315,900.00
23,625.00
2,450.00
95,000.00
7,000.00
128,075.00 934,620.00 1,062,695.00
18,000.00
7,350.00
1,710.00
4,050.00
420.00
126.00
6,306.00 25,350.00 31,656.00
7,500.00
3,062.50
1,710.00
4,050.00
420.00
126.00
6,306.00 10,562.50 16,868.50
25,500.00
10,412.50
1,710.00
4,050.00
420.00
126.00
6,306.00 35,912.50 42,218.50
DAFTAR HARGA SATUAN BAHAN
KABUPATEN TULANG BAWANG BARAT
SATUAN (Rp)
1 Bulldozer E 001
2 Motor Grader E 010
3 Hydrolic Excavator ( 1,3 M3 ) E 020
4 Stone Crusher ( 30 ton/hari ) E 031
5 Sceening Plant E 040
6 Loader Wheeled E 052
7 Tractor Wheeled E 053
8 Roller 3 Wheel ( 8 - 10 ton ) E 080
9 Tandem Roller ( 6 - 8 ton ) E 081
10 Vibrator Roller ( 5- 8 ton ) E 082
11 Pneumatic Roller ( 8 - 15 ton ) E 084
12 Vibrator Roller ( 0,6 ton ) E 087
13 Plate Vibrator Stamper E 088
14 Concrete Vibrator E 089
15 Chip Spreader E 130
16 Asphalt Sprayer Towed ( 1000 liter E 153
17 Asphalt Sprayer Towed ( 400 liter ) E 154
18 Asphalt Mixing Plant ( 30 t/h ) E 155
19 Asphalt Finisher E 157
20 Water Tank Truck E 182
21 Dump Truck ( 3,5 ton ) E 211
22 Dump Truck ( 5,0 ton ) E 212
23 Flat Bed Truck ( 3,5 ton ) E 221
24 Flat Bed Truck ( 5,0 ton ) E 224
25 Concrete Mixer ( 0,25 M3 ) E 252
26 Concrete Mixer ( 0,125 M3 ) E 301
27 Compressor ( Air 150 M3/Jam ) E 302
28 Generator ( 3 - 5 Kva ) E 311
29 Water Pump ( Ø 5 cm ) E 341
30 Peralatan Tractor ( Tractor Equipm E 401
AR HARGA SEWA PERALATAN
UPATEN TULANG BAWANG BARAT
II PEKERJAAN PASANGAN
1 Pasangan pondasi batu kali 1pc : 6 ps G.36 H m3 2.52 812,805.00
2 Pas. Batu kosong m3 0.48 363,345.00
3 Pas. Bata D.8 m2 29.76 83,400.00
V PEKERJAAAN ATAP
1 Pas. Rangka atap kayu 6/12 m3 1.27 1,500,000.00
2 Pas. Atap asbes m2 14.40 45,156.00
Disetujui : Mengetahui :
PPK Dinkes Kab. Tuba Barat Kepala Desa
73,248.00
10,437.84
132,627.00
2,048,268.60
174,405.60
2,481,984.00
362,968.20
1,302,347.40
2,059,332.48
1,109,363.52
1,905,000.00
650,246.40
12,310,229
12,310,229
-
Dibuat :
Ketua TKM
Erwin A. Bahtiar