REKAP TOTAL DAFTAR KUANTITAS DAN HARGA (DKH)

Nama Pekerjaan : Lanjutan Rekonstruksi Jalan Sp. Jln Nas Jemb Sihapilis-Sp. Jln Nas Tanjungan Kec Nainggolan (DAK)
Lokasi : Kec. Nainggolan Kab. Samosir
Tahun Anggaran : 2022

BOBOT
NO URAIAN PEKERJAAN JUMLAH HARGA (Rp) SESUAI KET.
SPK (%)
a b f = (d x e) g

I. DEVISI 1 UMUM Rp 89.975.457,02 1,020%

II. DEVISI 2 DRAINASE Rp 363.666.423,94 4,124%

III. DEVISI 3 PEKERJAAN TANAH DAN GEOSINTETIK Rp 206.561.283,20 2,343%

IV. DEVISI 5 PERKERASAN BERBUTIR Rp 2.991.234.809,85 33,923%

V. DEVISI 6 PERKERASAN ASPAL Rp 2.862.394.351,23 32,462%

VI. DEVISI 7 STRUKTUR Rp 2.184.869.547,03 24,778%

VII. DEVISI 9 PEKERJAAN HARIAN DAN PEKERJAAN LAIN-LAIN Rp 50.330.879,92 0,571%

VIII. DEVISI 10 PEKERJAAN PEMELIHARAAN KINERJA Rp 68.649.066,00 0,779%

TOTAL ( I+II+III+IV+V+VI+VII+VIII) : Rp 8.817.681.818,18


PPN (10%) : : Rp 881.768.181,82 100,000%

GRAND TOTAL : Rp 9.699.450.000,00


PEMBULATAN : Rp 9.699.450.000,00
SEMBILAN MILYAR ENAM RATUS SEMBILAN PULUH SEMBILAN JUTA EMPAT RATUS LIMA PULUH RIBU
TERBILANG :
RUPIAH

Dibuat Oleh :
PENYEDIA JASA
PT. SANGBUMA GARUDA PERSADA

PESTA TUA BUDIONO HUTAPEA, SE


Direktur Utama

Page 1 of 5
DAFTAR KUANTITAS DAN HARGA (DKH)

Nama Pekerjaan : Lanjutan Rekonstruksi Jalan Sp. Jln Nas Jemb Sihapilis-Sp. Jln Nas Tanjungan Kec Nainggolan (DAK)
Lokasi : Kec. Nainggolan Kab. Samosir
Tahun Anggaran : 2022

HARGA KONTRAK NEGOISASI BOBOT


NO URAIAN PEKERJAAN SATUAN VOLUME SESUAI KET.
HARGA SATUAN (Rp) JUMLAH HARGA (Rp) SPK (%)
a b c d e f = (d x e) g

I. DEVISI 1 UMUM Rp 89.975.457,02 1,020%

1 Mobilisasi Ls 1,00 Rp 76.595.457,02 Rp 76.595.457,02 0,869%


2 Management dan Keselamatan Lalu Lintas Ls 1,00 Rp 900.000,00 Rp 900.000,00 0,010%
3 Keselamatan dan Kesesatahan Kerja Ls 1,00 Rp 12.480.000,00 Rp 12.480.000,00 0,142%

II. DEVISI 2 DRAINASE Rp 363.666.423,94 4,124%

1 Galian Untuk Selokan Drainase dan Saluran Air M3 626,28 Rp 37.364,77 Rp 23.400.808,16 0,265%
2 Pasangan Batu Dengan Mortar M3 277,03 Rp 1.228.262,70 Rp 340.265.615,78 3,859%

III. DEVISI 3 PEKERJAAN TANAH DAN GEOSINTETIK Rp 206.561.283,20 2,343%

1 Galian Biasa M3 1.709,30 Rp 22.528,91 Rp 38.508.665,86 0,437%


2 Timbunan Pilihan dari Sumber Galian M3 168,50 Rp 274.889,11 Rp 46.318.815,04 0,525%
3 Penyiapan Badan Jalan M2 10.110,00 Rp 12.040,93 Rp 121.733.802,30 1,381%

IV. DEVISI 5 PERKERASAN BERBUTIR Rp 2.991.234.809,85 33,923%

1 Lapis Pondasi Agregat Kelas A M3 2.022,00 Rp 1.059.594,81 Rp 2.142.500.705,82 24,298%


2 Lapis Pondasi Agregat Kelas B M3 842,50 Rp 1.007.399,53 Rp 848.734.104,03 9,625%

V. DEVISI 6 PERKERASAN ASPAL Rp 2.862.394.351,23 32,462%

1 Lapis Resap Pengikat - Aspal Cair (Emulsi) Liter 10.784,00 Rp 20.836,82 Rp 224.704.266,88 2,548%
2 Laston Lapis Aus (AC-WC) Ton 1.529,98 Rp 1.707.687,57 Rp 2.612.727.828,35 29,631%
3 Bahan Anti Pengelupasan Kg 275,40 Rp 90.640,00 Rp 24.962.256,00 0,283%

VI. DEVISI 7 STRUKTUR Rp 2.184.869.547,03 24,778%

1 Beton Struktur Fc'20 Mpa M3 83,85 Rp 3.222.484,01 Rp 270.205.284,24 3,064%


2 Beton Fc'15 Mpa M3 450,60 Rp 1.964.572,12 Rp 885.236.197,27 10,039%
3 Beton Fc'10 Mpa M3 0,60 Rp 1.860.325,31 Rp 1.116.195,19 0,013%
4 Baja Tulangan Polos - BJTP 280 Kg 4.490,29 Rp 28.798,19 Rp 129.312.224,58 1,467%
5 Pasangan Batu M3 697,46 Rp 1.288.962,30 Rp 898.999.645,76 10,195%

VII. DEVISI 9 PEKERJAAN HARIAN DAN PEKERJAAN LAIN-LAIN Rp 50.330.879,92 0,571%

1 Marka Jalan Termoplastik M2 161,76 Rp 280.235,41 Rp 45.330.879,92 0,514%


2 Rambu Jalan Tunggal dengan Pemantul Engineering Grade Bh 5,00 Rp 1.000.000,00 Rp 5.000.000,00 0,057%

VIII. DEVISI 10 PEKERJAAN PEMELIHARAAN KINERJA Rp 68.649.066,00 0,779%

1 Perbaikan Lapis Pondasi Agregat Kelas B M3 108,00 Rp 635.639,50 Rp 68.649.066,00 0,779%

TOTAL ( I+II+III+IV+V+VI+VII+VIII) : Rp 8.817.681.818,18


PPN (10%) : : Rp 881.768.181,82 100,000%

GRAND TOTAL : Rp 9.699.450.000,00

Page 2 of 5
JADWAL WAKTU PELAKSANAAN
180 HARI
Nama Pekerjaan : Lanjutan Rekonstruksi Jalan Sp. Jln Nas Jemb Sihapilis-Sp. Jln Nas Tanjungan Kec Nainggolan (DAK) KALENDER
Lokasi : Kec. Nainggolan Kab. Samosir
Tahun Anggaran : 2022

WAKTU PELAKSANAAN 180 HARI KALENDER


HARI KE-
BOBOT
SESUAI 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
NO URAIAN PEKERJAAN SATUAN VOLUME KET.
KONTRAK 11-Apr-22 18-Apr-22 25-Apr-22 02-May-22 09-May-22 16-May-22 23-May-22 30-May-22 06-Jun-22 13-Jun-22 20-Jun-22 27-Jun-22 04-Jul-22 11-Jul-22 18-Jul-22 25-Jul-22 01-Aug-22 08-Aug-22 15-Aug-22 22-Aug-22 29-Aug-22 05-Sep-22 12-Sep-22 19-Sep-22 26-Sep-22 03-Oct-22
/ SPK (%)
S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D
17-Apr-22 24-Apr-22 01-May-22 08-May-22 15-May-22 22-May-22 29-May-22 05-Jun-22 12-Jun-22 19-Jun-22 26-Jun-22 03-Jul-22 10-Jul-22 17-Jul-22 24-Jul-22 31-Jul-22 07-Aug-22 14-Aug-22 21-Aug-22 28-Aug-22 04-Sep-22 11-Sep-22 18-Sep-22 25-Sep-22 02-Oct-22 07-Oct-22

I. DEVISI 1 UMUM 1,020% 0,434% 0,434% 0,006% 0,006% 0,006% 0,006% 0,006% 0,006% 0,006% 0,006% 0,006% 0,006% 0,006% 0,006% 0,006% 0,006% 0,006% 0,006% 0,006% 0,006% 0,006% 0,006% 0,006% 0,006% 0,006% 0,006%

1 Mobilisasi Ls 1,000 0,869% 0,434% 0,434%


2 Management dan Keselamatan Lalu Lintas Ls 1,000 0,010% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%
3 Keselamatan dan Kesesatahan Kerja Ls 1,000 0,142% 0,006% 0,006% 0,006% 0,006% 0,006% 0,006% 0,006% 0,006% 0,006% 0,006% 0,006% 0,006% 0,006% 0,006% 0,006% 0,006% 0,006% 0,006% 0,006% 0,006% 0,006% 0,006% 0,006% 0,006%

II. DEVISI 2 DRAINASE 4,124% 0,000% 0,000% 0,837% 0,938% 0,938% 0,938% 0,472% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%

1 Galian Untuk Selokan Drainase dan Saluran Air M3 626,280 0,265% 0,265%
2 Pasangan Batu Dengan Mortar M3 277,030 3,859% 0,572% 0,938% 0,938% 0,938% 0,472%

III. DEVISI 3 PEKERJAAN TANAH DAN GEOSINTETIK 2,343% 0,000% 0,000% 0,000% 0,146% 0,146% 0,146% 0,063% 0,463% 0,660% 0,660% 0,060% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%

1 Galian Biasa M3 1.709,300 0,437% 0,146% 0,146% 0,146%


2 Timbunan Pilihan dari Sumber Galian M3 168,500 0,525% 0,063% 0,463%
3 Penyiapan Badan Jalan M2 10.110,000 1,381% 0,660% 0,660% 0,060%

IV. DEVISI 5 PERKERASAN BERBUTIR 33,923% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 3,391% 3,160% 3,160% 3,160% 3,329% 4,050% 4,050% 4,695% 2,222% 2,708% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%

1 Lapis Pondasi Agregat Kelas A M3 2.022,000 24,298% 3,391% 3,160% 3,160% 3,160% 3,329% 4,050% 4,050%
2 Lapis Pondasi Agregat Kelas B M3 842,500 9,625% 4,695% 2,222% 2,708%

V. DEVISI 6 PERKERASAN ASPAL 32,462% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,274% 2,274% 4,747% 4,260% 6,969% 6,969% 6,969% 0,000% 0,000% 0,000%

1 Lapis Resap Pengikat - Aspal Cair (Emulsi) Liter 10.784,000 2,548% 0,274% 2,274%
2 Laston Lapis Aus (AC-WC) Ton 1.529,980 29,631% 4,747% 4,260% 6,969% 6,969% 6,686%
3 Bahan Anti Pengelupasan Kg 275,400 0,283% 0,283%

VI. DEVISI 7 STRUKTUR 24,778% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,388% 0,460% 0,262% 0,262% 3,411% 3,703% 3,703% 3,703% 3,534% 2,813% 2,539% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000%

1 Beton Struktur Fc'20 Mpa M3 83,850 3,064% 3,064%


2 Beton Fc'15 Mpa M3 450,600 10,039% 3,346% 3,346% 3,346%
3 Beton Fc'10 Mpa M3 0,600 0,013% 0,013%
4 Baja Tulangan Polos - BJTP 280 Kg 4.490,290 1,467% 0,388% 0,460% 0,262% 0,262% 0,093%
5 Pasangan Batu M3 697,460 10,195% 3,318% 0,356% 0,356% 0,356% 0,456% 2,813% 2,539%

VII. DEVISI 9 PEKERJAAN HARIAN DAN PEKERJAAN LAIN-LAIN 0,571% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,285% 0,285% 0,000%

1 Marka Jalan Termoplastik M2 161,760 0,514% 0,257% 0,257%


2 Rambu Jalan Tunggal dengan Pemantul Engineering Grade Bh 5,000 0,057% 0,028% 0,028%

VIII. DEVISI 10 PEKERJAAN PEMELIHARAAN KINERJA 0,779% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,000% 0,260% 0,260% 0,260%

1 Perbaikan Lapis Pondasi Agregat Kelas B M3 108,000 0,779% 0,260% 0,260% 0,260%

RENCANA : 100,000% 0,434% 0,434% 0,844% 1,090% 1,090% 1,090% 0,929% 0,929% 0,929% 0,929% 6,869% 6,869% 6,869% 6,869% 6,869% 6,869% 6,869% 6,975% 6,975% 6,975% 6,975% 6,975% 6,975% 0,551% 0,551% 0,265%

KOMULATIF RENCANA : 0,434% 0,869% 1,712% 2,803% 3,893% 4,983% 5,912% 6,841% 7,770% 8,699% 15,568% 22,437% 29,306% 36,174% 43,043% 49,912% 56,781% 63,756% 70,731% 77,706% 84,682% 91,657% 98,632% 99,183% 99,735% 100,000%

REALISASI :

KOMULATIF REALISASI :

Dibuat Oleh :
PENYEDIA JASA
PT. SANGBUMA GARUDA PERSADA

PESTA TUA BUDIONO HUTAPEA, SE


Direktur Utama

Page 3 of 5
SCHEDULE MATERIAL ON-SITE
180 HARI
Nama Pekerjaan : Lanjutan Rekonstruksi Jalan Sp. Jln Nas Jemb Sihapilis-Sp. Jln Nas Tanjungan Kec Nainggolan (DAK) KALENDER
Lokasi : Kec. Nainggolan Kab. Samosir
Tahun Anggaran : 2022

WAKTU PELAKSANAAN 180 HARI KALENDER

MINGGU KE-

ESTIMASI 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
NO JENIS BAHAN / MATERIAL SATUAN KEBUTUHAN KET.
VOLUME 11/04/22 18/04/22 25/04/22 02/05/22 09/05/22 16/05/22 23/05/22 30/05/22 06/06/22 13/06/22 20/06/22 27/06/22 04/07/22 11/07/22 18/07/22 25/07/22 01/08/22 08/08/22 15/08/22 22/08/22 29/08/22 05/09/22 12/09/22 19/09/22 26/09/22 03/10/22

S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D

17/04/22 24/04/22 01/05/22 08/05/22 15/05/22 22/05/22 29/05/22 05/06/22 12/06/22 19/06/22 26/06/22 03/07/22 10/07/22 17/07/22 24/07/22 31/07/22 07/08/22 14/08/22 21/08/22 28/08/22 04/09/22 11/09/22 18/09/22 25/09/22 02/10/22 07/10/22

1 Agregat A M3 2.544,908

2 Agregat B M3 1.168,378

3 Agregat Kasar / Batu Split M3 470,833

4 Aspal Kg 103.450,721

5 Bahan Timbunan Pilihan M3 187,035

6 Baja Tulangan (Polos) U24 Kg 4.490,290

7 Batu Kali M3 974,490

8 Cat Marka Thermoplastic Kg 315,432

9 Glass Bead Kg 72,792

10 Kawat Beton Kg 11,226

11 Kayu Perancah M3 61,860

12 Kerosene Liter 3.998,707

13 Lolos screen2 ukuran ( 0 - 5) M3 539,040

14 Lolos screen2 ukuran ( 9.5 - 19,0) M3 455,697

15 Minyak Pencair (Thinner) Liter 169,848

16 Paku Kg 494,880

17 Pasir Pasang M3 387,271

18 Pasir beton M3 272,057

19 Semen 40 Kg Zak 8.269,218

Dibuat Oleh :

PENYEDIA JASA

PT. SANGBUMA GARUDA PERSADA

PESTA TUA BUDIONO HUTAPEA, SE

Direktur Utama

Page 4 of 5
SCHEDULE TENAGA KERJA ON-SITE
180 HARI
Nama Pekerjaan : Lanjutan Rekonstruksi Jalan Sp. Jln Nas Jemb Sihapilis-Sp. Jln Nas Tanjungan Kec Nainggolan (DAK) KALENDER
Lokasi : Kec. Nainggolan Kab. Samosir
Tahun Anggaran : 2022

WAKTU PELAKSANAAN 180 HARI KALENDER

MINGGU KE-

JUMLAH 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
NO JENIS TENAGA KERJA SATUAN TENAGA KET.
KERJA 11/04/22 18/04/22 25/04/22 02/05/22 09/05/22 16/05/22 23/05/22 30/05/22 06/06/22 13/06/22 20/06/22 27/06/22 04/07/22 11/07/22 18/07/22 25/07/22 01/08/22 08/08/22 15/08/22 22/08/22 29/08/22 05/09/22 12/09/22 19/09/22 26/09/22 03/10/22

S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D S/D

17/04/22 24/04/22 01/05/22 08/05/22 15/05/22 22/05/22 29/05/22 05/06/22 12/06/22 19/06/22 26/06/22 03/07/22 10/07/22 17/07/22 24/07/22 31/07/22 07/08/22 14/08/22 21/08/22 28/08/22 04/09/22 11/09/22 18/09/22 25/09/22 02/10/22 07/10/22

I. TENAGA KERJA PROFESIONAL

1 Manager Lapangan Orang 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

2 Pelaksana Lapangan Orang 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

3 Tenaga Ahli K3 Konstruksi Orang 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

4 Surveyor / Juru Ukur Orang 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

5 Logistik / Keuangan Orang 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

KURVA QUANTITAS
II. TENAGA KERJA SUBPROFESIONAL MAN POWER
1 Tukang Gali Orang 20 5 20 20 20

2 Tukang Batu Orang 18 10 10 10 10 10 0 0 0 18 18 18 18 18 18 18

3 Tukang Besi Orang 3 3 3 3 3 3

4 Tukang Kayu Orang 2 2 2 2 2 2

5 Tukang Cor Beton Orang 6 6 6 6 6

6 Tukang Marka Jalan Orang 3 3 3

7 Operator Orang 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3

8 Mekanik Orang 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

9 Pekerja / Helper Orang 20 4 10 10 10 10 10 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 5 5 5

TOTAL : Orang 81 3 13 34 49 49 49 34 34 34 34 52 53 53 53 53 47 47 29 29 29 29 29 29 17 17 14

Dibuat Oleh :

PENYEDIA JASA

PT. SANGBUMA GARUDA PERSADA

PESTA TUA BUDIONO HUTAPEA, SE

Direktur Utama