1 Persiapan Rp -
3 MEP Kawasan
- Peralatan Utama Elektrikal Rp -
- Penerangan Jalan Utama Rp -
- Peralatan Utama Elektronik Rp -
- Peralatan Utama Plumbing Rp -
Sub Total Rp -
PPN 10% 10% Rp -
TOTAL Rp -
BOQ
RESTO Taman Wisata Rohani Bukit Sibeabea
Kabupaten Samosir
HARGA JUMLAH
NO KODE ITEM PEKERJAAN VOLUME SATUAN
SATUAN (Rp.) HARGA (Rp.)
A PEKERJAAN PERSIAPAN
1 A.2.2.1.9 Pembersihan Lapangan 2,571.96 M²
1 Penyiapan RK3K
a. Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja
- Area Gerbang, Kantor Pengelola, & Pos Jaga set 1 1 X Rp.
- Area Plaza set 1 1 X Rp.
b. Pembuatan Kartu Identitas Pekerja
- Area Gerbang, Kantor Pengelola, & Pos Jaga org 20 1 X Rp.
- Area Plaza org 30 1 X Rp.
Subtotal
5 Penanganan Covid-19
- Area Gerbang, Kantor Pengelola, & Pos Jaga
- Area Plaza
a. Pembentukan Satgas Pencegahan Covid-19 ls 2 1X Rp.
b. Peralatan pencegahan Covid-19 (masker, hand sanitizer, dll) ls 4 1X Rp.
c. Alat Ukur Suhu Tubuh ls 2 1X Rp.
d. Vitamin, Vaksin, nutrisi tambahan bh 2 6X Rp.
Subtotal
TOTAL
BOQ ALAT BERAT
Taman Wisata Rohani Bukit Sibeabea
Kabupaten Samosir - Sumatera Utara
Jumlah
BOQ
Taman Wisata Rohani Bukit Sibeabea
Kabupaten Samosir
BANGUNAN PENGELOLA
NO KODE ANALISA JENIS PEKERJAAN VOL SAT HARGA SAT JUMLAH HARGA
NO KODE ANALISA JENIS PEKERJAAN VOL SAT HARGA SAT JUMLAH HARGA
Pek. Balok
Balok B1 150x350 mm
A.4.1.1.9.a - Beton, mutu K-250 2.36 m3
A.4.1.1.17 - Besi Ulir 495.27 kg
A.4.1.1.23 - Bekisting Balok (penggunaan 2x pakai) 31.37 m2
Balok B2 150x300 mm
A.4.1.1.9.a - Beton, mutu K-250 1.69 m3
A.4.1.1.17 - Besi Ulir 341.77 kg
A.4.1.1.23 - Bekisting Balok (penggunaan 2x pakai) 20.85 m2
Balok B3 150x200 mm
A.4.1.1.9.a - Beton, mutu K-250 0.49 m3
A.4.1.1.17 - Besi Ulir 116.46 kg
A.4.1.1.23 - Bekisting Balok (penggunaan 2x pakai) 6.72 m2
Balok B4 150x350 mm
A.4.1.1.9.a - Beton, mutu K-250 0.42 m3
A.4.1.1.17 - Besi Ulir 221.36 kg
A.4.1.1.23 - Bekisting Balok (penggunaan 2x pakai) 5.36 m2
Balok B4A 150x350 mm
A.4.1.1.9.a - Beton, mutu K-250 0.07 m3
A.4.1.1.17 - Besi Ulir 16.61 kg
A.4.1.1.23 - Bekisting Balok (penggunaan 2x pakai) 1.01 m2
Pek. Tangga
A.4.1.1.9.a - Beton, mutu K-250 2.28 m3
A.4.1.1.17 - Besi Ulir 296.42 kg
A.4.1.1.26 - Bekisting (penggunaan 2x pakai) 17.78 m2
SUBTOTAL PEKERJAAN
TOTAL PEKERJAAN LANTAI BAWAH
C Pekerjaan Plafon
1 A.4.2.1.21 Pek. Rangka Langit-langit - Hollow Galvanis 40x40x1,5, 20x40x1,5 - Jarak 60x60 99.88 m²
2 A.4.5.1.7a Pek. Pasang Langit-langi GRC Board tipe RE (Recessed Edge ) 120x240 tebal 6 mm 99.88 m²
3 A.4.5.1.9 Pek. Pasang Lis Plafon Shadow Line Aluminium 99.00 m²
4 A.4.7.1.10 Pek. Cat Plafond 99.88 m²
Total Pekerjaan Plafon Rp -
E Sanitary
1 A.4.1.1.24a Pek. Bekisting Meja Beton Wastafel 3.60 m²
2 A.4.1.1.17 Pek. Pembesian Meja Beton Washtafel 0.80 kg
3 A.4.1.1.2 Pek. Beton Meja Washtafel f’c = 9,8 MPa (K125), slump(12+2) cm, w/c=0,78 0.36 m³
4 A.4.4.3.35f Pek. Finishing Meja Beton Washtafel HT 120x60 4.80 m²
5 A.5.1.1.5a Pek. Pas. Wastafel Publik 4.00 unit
6 A.5.1.1.19a Pek. Pas. Kran Wastafel Publik 4.00 unit
7 A.5.1.1.5c Pek.Pas. Wastafel Injak Portable Stainless 2.00 unit
8 A.5.1.1.4d Pek. Pas 1 buah Hand Sanitizer Injak Portabel 2.00 unit
9 A.4.6.1.28a Pek. Pas. Dinding Partisi Toilet dengan pintu 8.40 m²
10 A.5.1.1.1 Pek. Pas. Closet Duduk Publik 3.00 unit
11 A.5.1.1.19b Pek. Pas. Jet Washer 3.00 unit
12 A.5.1.1.4c Pek. Pas. Tissue Holder 3.00 unit
13 A.5.1.1.4 Pek. Pas. Urinal 2.00 unit
14 A.5.1.1.4a Pek. Pas. Urinal Partition 1.00 unit
15 A.5.1.1.19c Pek. Pas. Shower set 1.00 unit
16 A.5.1.1.14 Pek. Pas. Floor Drain 5.00 bh
17 A.4.6.2.20 Pek. Pas. Kaca Cermin Toilet Pria Frameless uk. 200x 120 cm 3.00 m²
18 A.4.6.2.20 Pek. Pas. Kaca Cermin Toilet Wanita Frameless uk. 400x 120 cm 4.20 m²
Total Pekerjaan Sanitari Rp -
TOTAL PEKERJAAN ARSITEKTUR KANTOR PENGELOLA Rp -
BOQ
Taman Wisata Rohani Bukit Sibeabea
Kabupaten Samosir
MEP. BANGUNAN PENGELOLA
NO KODE ANALISA JENIS PEKERJAAN VOL SAT HARGA SAT JUMLAH HARGA
A PEKERJAAN ELEKTRIKAL
A.1.2 Grounding
1 MEP.EL.BK.61MEP.EL.G.62 Grounding Panel PL-PGL 1.00 unit
B PEKERJAAN ELEKTRONIK
C PEKERJAAN PLUMBING
C.1.4 Valve-valve :
1 MEP.PL.V.06 dia. 25mm 4.00 unit
2 MEP.PL.V.05 dia. 20mm 1.00 unit
10 Fitting-fitting 1.00 ls
CF-D.01
2 MEP.PL.BT.02 - Fan 100 CFM, Type Ceiling Exhaust Fan 1.00 unit
NO KODE ANALISA JENIS PEKERJAAN VOL SAT HARGA SAT JUMLAH HARGA
NO KODE ANALISA JENIS PEKERJAAN VOL SAT HARGA SAT JUMLAH HARGA
Balok B3 150x400 mm
A.4.1.1.9.a - Beton, mutu K-250 0.35 m3
A.4.1.1.17 - Besi Ulir 60.60 kg
A.4.1.1.23 - Bekisting Balok (penggunaan 2x pakai) 4.97 m2
SUBTOTAL PEKERJAAN Rp -
TOTAL PEKERJAAN LANTAI BAWAH Rp -
C Pekerjaan Plafon
1 A.4.2.1.21 Pek. Rangka Langit-langit - Hollow Galvanis 40x40x1,5, 20x40x1,5 - Jarak 60x60 32.00 m²
Pek. Pasang Langit-langi GRC Board tipe RE (Recessed Edge ) 120x240 tebal 6
2 A.4.5.1.7a mm, nat isi semen khusus GRC 32.00 m²
3 A.4.5.1.9 Pek. Pasang Lis Plafon Shadow Line Aluminium 32.00 m²
4 A.4.7.1.10 Pek. Cat Plafond 32.00 m²
Total Pekerjaan Plafon Rp -
B PEKERJAAN ELEKTRONIK
C PEKERJAAN PLUMBING
2 Fitting-fitting 1.00 ls
NO KODE ANALISA JENIS PEKERJAAN VOL SAT HARGA SAT JUMLAH HARGA
SUBTOTAL PEKERJAAN Rp -
TOTAL PEKERJAAN LANTAI BAWAH Rp -
E Sanitary
1 A.4.1.1.24a Pek. Bekisting Meja Beton Wastafel 4.20 m²
2 A.4.1.1.17 Pek. Pembesian Meja Beton Wastafel 0.93 kg
3 A.4.1.1.2 Pek. Beton Meja Washtafel f’c = 9,8 MPa (K125), slump(12+2) cm, w/c=0,78 0.42 m³
4 A.4.4.3.35f Pek. Finishing Meja Beton Wastafel HT 120x60 5.60 m²
5 A.5.1.1.5a Pek. Pas. Wastafel Publik 4.00 unit
6 A.5.1.1.5b Pek. Pas. Wastafel Difable 1.00 unit
7 A.5.1.1.19a Pek. Pas. Kran Washtafel Publik & difable 5.00 unit
8 A.5.1.1.5c Pek.Pas. Wastafel Injak Portable Stainless 1.00 unit
9 A.5.1.1.4d Pek. Pas 1 buah Hand Sanitizer Injak Portabel 1.00 unit
10 A.4.6.1.28a Pek. Pas. Dinding Partisi Toilet dengan pintu 17.28 m²
11 A.5.1.1.1 Pek. Pas. Closet duduk publik 4.00 unit
12 A.5.1.1.2 Pek. Pas. Closet Jongkok publik 3.00 unit
13 A.5.1.1.19b Pek. Pas. Jet Washer 7.00 unit
14 A.5.1.1.4c Pek. Pas. Tissue Holder 7.00 unit
15 A.5.1.1.4 Pek. Pas. Urinal 3.00 unit
16 A.5.1.1.4a Pek. Pas. Urinal Partition 2.00 unit
17 A.5.1.1.14 Pek. Pas. Floor Drain 11.00 bh
18 A.4.6.2.20 Pek. Pas. Kaca Cermin Toilet Pria Frameless uk. 300x 120 cm 3.60 m²
19 A.4.6.2.20 Pek. Pas. Kaca Cermin Toilet Wanita Frameless uk. 400x 120 cm 4.80 m²
20 A.4.6.2.20 Pek. Pas. Kaca Cermin Toilet Difable Frameless uk. 100x 120 cm 1.20 m²
Total Pekerjaan Sanitari Rp -
TOTAL PEKERJAAN ARSITEKTUR TOILET SIOSIO 1 Rp -
BOQ
Taman Wisata Rohani Bukit Sibeabea
Kabupaten Samosir
MEP. BANGUNAN TOILET SIOSIO 1
NO KODE ANALISA JENIS PEKERJAAN VOL SAT HARGA SAT JUMLAH HARGA
A PEKERJAAN ELEKTRIKAL
B PEKERJAAN PLUMBING
C.1.4 Valve-valve :
1 MEP.PL.V.07 dia.40mm 1.00 unit
1 MEP.PL.V.06 dia.32mm 2.00 unit
2 MEP.PL.V.05 dia. 20mm 1.00 unit
1 MEP.EL.L.14 BDS470 C 35xLED/NW PSU 220-240V TA GM Lampu Tiang 1 - LED 34 Watt 52 unit
2 MEP.EL.L.15 BBP342 LED1200/WW 12W 20D 100-240V Lampu Inground Uplight - LED 12 Watt 22 unit
3 MEP.EL.L.8 BCP311 LED760/WW 15W 100-240V Cyl BK Lampu Bollard LED - 15 Watt 19 unit
5 MEP.EL.L.24 BVP322 18LED 40K 220V 30 Lampu Sorot LED - 36 Watt 16 unit
1 MEP.EL.ODP.65.b Optic Distribution Panel (ODP), Type Pedestal 1.1 - 24 Core 1.00 unit
2 MEP.EL.FOS.66 Optic Distribution Panel (ODP), Type Pedestal 1.2 - 8 Core 1.00 unit
3 MEP.EL.FOS.66 Optic Distribution Panel (ODP), Type Pedestal 1.3 - 8 Core 1.00 unit
A.3 KABEL Fiber Optic, Single Mode, 2C, pipa conduit HI Ø 20mm²
1 Dari NVR ke Hub Switch:
MEP.EL.FOS.66 - Bangunan Pos Jaga- Pengelola 100.00 m
2 Dari NVR ke 11 unit CCTV Outdoor:
Volume
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Kode Pekerjaa Satuan PER AREA
Pekerjaan (Rp) Pekerjaan (Rp)
n
SOFTSCAPE
AREA HARBANGAN
POHON
1 Flame of the forest (Butea monosperma) Bm 12 phn
2 Trembesi (Samanea saman) Ss 2 phn
JUMLAH Rp -
SEMAK
1 Angelonia (Angelonia sp.) An 115.8 m2
2 Rumput biru (Festuca glauca) Fg 157.7 m2
3 Alang-alang ungu (Pennisetum setaceum) Pse 51.5 m2
4 Love grass (Pennisetum sp.) Pe 20.4 m2
5 Bugenvil ungu (Bougainvillea sp.'purple') Bsp 88.5 m2
JUMLAH Rp -
TOTAL Rp -
HARDSCAPE
AREA HARBANGAN
1 Andesit mix warna hitam, abu-abu, & bintik rtm
40cm x 40cm x 3cm 83 m2
2 Kanstin beton abu-abu
40cm x 15cm x 15cm 50 m'
3 Tempat sampah
Tipe 2 4 unit
JUMLAH Rp -
TOTAL Rp -
Volume
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Kode Pekerjaa Satuan PER AREA
Pekerjaan (Rp) Pekerjaan (Rp)
n
SOFTSCAPE
AREA PLAZA PARSAORAN & ALAMAN
POHON
1 Tabebuia alba Ta 14 phn
2 Ketapang kencana Var. (Terminalia mantaly Var.) Tmv 33 phn
3 Jakaranda (Jacaranda mimosifolia) Jm 26 phn
4 Hariara (Ficus drupacea Thumb) Fd 1 phn
5 Bungur ungu (Lagerstroemia speciosa) Ls 5 phn
6 Kayu manis (Cinnamomum zeylanicum) Cz 11 phn
7 Bungur putih (Lagerstroemia indica alba) Lsp 10 phn
JUMLAH Rp -
SEMAK
1 Angelonia (Angelonia sp.) An 76.3 m2
2 Rumput biru (Festuca glauca) Fg 49.5 m2
3 Love grass (Pennisetum sp.) Pe 110.8 m2
4 Alang-alang ungu (Pennisetum setaceum) Pse 131.2 m2
5 Air mancur putih (Rusella equisetiformis 'white') Rew 94 m2
6 Plumbago (Plumbago auriculata) Pa 127.9 m2
7 Adam hawa (Rheo spathacea) Rs 1.7 m2
10 Agapanthus putih (Agapanthus praecox 'pure white' ) App 229.8 m2
11 Agapanthus ungu (Agapanthus praecox 'blue giant') Apb 20.8 m2
12 Ararea (Osmoxylon lineare) Ol 107 m2
13 Agave (Agave angustifolia) Aa 18 plb
JUMLAH Rp -
RUMPUT
1 Rumput Manila (Zoyzia matrella) Zm 144 m2
JUMLAH Rp -
TOTAL Rp -
HARDSCAPE
AREA PLAZA PARSAORAN & ALAMAN
2 Andesit mix warna hitam, abu-abu & bintik RTM
40cm x 40cm x 3 cm 1527 m2
3 Pattern Concrete 1489 m2
4 Andesit mix warna hitam, abu-abu & bintik RTM
10cm x 10cm x5cm 613 m2
5 Monoblock
15 cm x 15 cm x 8 cm 180 m2
6 Rumput Manila (Zoyzia matrella) 151 m2
7 Versicell 178 m2
8 Tempat Sampah
Tipe 2 9 unit
9 Gabion 7 unit
10 Root Barrier 100 unit
JUMLAH Rp -
TOTAL Rp -
SOFTSCAPE
AREA PARKIR PARTUNGKOAN
POHON
1 Butea monosperma (Palasa/flame of the forest) Bm 28 phn
2 Bungur ungu (Lagerstroemia speciosa) Ls 12 phn
3 Kayu manis (Cinnamomum zeylanicum) Cz 15 phn
4 Ketapang kencana (Terminalia mentaly) Tm 22 phn
JUMLAH Rp -
SEMAK
1 Alang-alang ungu (Pennisetum setaceum) Pse 182.4 m2
2 Bakung laba-laba (Hymenocallis speciosa) Hs 328 m2
3 Agapanthus ungu (Agapanthus praecox 'blue giant') Apb 260 m2
4 Ararea (Osmoxylon lineare) Ol 191.1 m2
5 Adam hawa (Rheo spathacea) Rs 40 m2
6 Bakung besar (Crinum asiaticum) Ca 197 m2
JUMLAH Rp -
TOTAL Rp -
HARDSCAPE
AREA PARKIR PARTUNGKOAN
1 Pattern Concrete 391.5 m2
2 Monoblock
15 cm x 15 cm x 8 cm 1472 m2
3 Rumput Manila (Zoyzia matrella) 736 m2
JUMLAH Rp -
TOTAL Rp -
BOQ
Taman Wisata Rohani Bukit Sibeabea
Kabupaten Samosir
Pekerjaan Struktur & Arsitektur Plaza Pedestrian Kawasan 3.06
NO KODE ANALISA JENIS PEKERJAAN VOL SAT HARGA SAT JUMLAH HARGA
AREA HARBANGAN 242.00
1 A.2.3.1.1 - Pekerjaan Galian Tanah. Lantai Plaza, 30cm 72.6 m³
2 A.2.3.1.11 - Urugan Pasir padat T=10cm 24.20 m³
3 B.01.a - Pekerjaan Lantai Kerja, Beton Tumbuk T=5cm, Lantai Plaza 12.10 m³
4 A.4.1.1.9.a - Pekerjaan Lantai Beton K-275 & Additive T=10cm 24.20 m³
5 A.4.1.1.1.19 - Wiremesh M.6, 1 lapis 739.31 kg
6 Dinding Signage
A.2.3.1.1 - Pek. Galian Tie Beam 16.70 m³
A.2.3.1.9 - Pek. Urugan Tanah Kembali + Pemadatan 5.01 m³
A.2.3.1.11 - Pek. Urugan Pasir Tebal 10 cm ( Bawah Tie Beam) 1.51 m³
A.4.1.1.5 - Beton 150x300, Mutu K-175 2.01 m³
A.4.1.1.17 - Besi Ulir 166.27 kg
A.4.1.1.21 - Bekisting Tie Beam 10.40 m²
A.4.4.1.26 - Pek. Pasang Bata Hebel 7.20 m²
A.4.4.3.58 - Pek. Pasang Batu Alam (bt. Sialagan) 7.20 m²
A.4.7.1.7 - Pek. Coating Batu Alam dinding Signage 2x Kuas 14.40 m²
7 Pagar
A.2.3.1.1 - Pek. Galian Tie Beam 0.31 m³
A.2.3.1.9 - Pek. Urugan Tanah Kembali + Pemadatan 0.12 m³
A.2.3.1.11 - Pek. Urugan Pasir Tebal 10 cm ( Bawah Tie Beam) 0.08 m³
A.4.1.1.5 - Beton 150x300, Mutu K-175 0.18 m³
A.4.1.1.17 - Besi Ulir 8.31 kg
A.4.1.1.21 - Bekisting Tie Beam 0.44 m²
A.4.4.1.26 - Pek. Pasang Bata Hebel 5.66 m²
A.4.4.3.58 - Pek. Pasang Batu Alam (bt. Sialagan) 11.31 m²
A.4.7.1.7 - Pek. Coating Batu Alam dinding Signage 2x Kuas 22.62 m²
A.4.2.1.15a - Pintu Pagar Besi Hollow 15.34 m²
A.4.7.1.18 - Pek. Finishing Cat Pintu Pagar Besi - Cat Besi Semi doff 15.34 m²
Rp -
PEKERJAAN ARSITEKTUR
A Railling Plaza Parsaroan
1 A.4.2.1.15a Pek. 1m2 Railling Besi Holow + Expanded Metal metal tebal 10mm, Tipe 40.00 m²
30080, finish Powder Coating warna coklat tua. + Hand railling Besi
Stainless dia 2,5 inchi.
2 A.4.7.1.18 Pek. Finishing Cat Rangka Railling - Cat Besi Semi doff 80.00 m²
Rp -
PEKERJAAN ARSITEKTUR
A Railling Parkir Partungkoan
1 A.4.2.1.15a Pek. 1m2 Railling Besi Holow + Expanded Metal metal tebal 10mm, Tipe 100.00 m²
30080, Powder Coating warna coklat tua. + Hand railling Besi Stainless dia
2,5 inchi.
2 A.4.7.1.18 Pek. Finishing Cat Rangka Railling - Cat Besi Semi doff 200.00 m²
NO KODE ANALISA JENIS PEKERJAAN VOL SAT HARGA SAT JUMLAH HARGA
B PEKERJAAN ASPHALT
A.2.3.1.10 Pek. Pemadatan 192.20 m3
PT13 Pek. Limestone 20 CM 192.20 m3
PT14 Pek. Makadam 20 cm 192.20 m3
PT17 Pek. Asphalt hotmix 2 cm 961.00 m2
SUBTOTAL PEKERJAAN Rp -
TOTAL PEKERJAAN LANTAI BAWAH Rp -