691,241,774.09
2,122,609,363.91
1,756,917,707.01
1,408,482,108.34
1,325,392,643.94
1,367,153,310.58
1,202,340,403.55
86,870,989.12
88,509,942.81
75,948,414.81
11,683,324.03
11,683,324,031.60
1168332403.16
12851656434.76
12,851,656,434.76
3824897.74844048
3477179.77130952
ANALISA SATUAN PEKERJAAN (MENGGUNAKAN HSPK SURAKARTA TAHUN 2019)
HARGA
NO URAIAN PEKERJAAN VOL. SAT. JUMLAH (Rp.)
SATUAN
[1] [2] [3] [4] [5] [6] (= 3 x 5)
A. PEKERJAAN PERSIAPAN RSNI T-12-2002
1 Pengukuran dan Pemasangan Bowplank (Uitzet) m1
Bahan
Kayu Meranti Papan 2/20, 4/10 0.0070 m3 4,347,000.00 30,429.00
Kayu Meranti Usuk 4/6, 5/7 0.0120 m3 3,900,000.00 46,800.00
Paku Biasa 2 - 5 inchi 0.0200 Kg 20,640.00 412.80
Upah
Mandor 0.0045 O.H 97,900.00 440.55
Kepala Tukang 0.0100 O.H 93,500.00 935.00
Tukang 0.1000 O.H 74,800.00 7,480.00
Buruh Tak Terampil 0.1000 O.H 67,000.00 6,700.00
TOTAL 93,197.35
Sewa Alat
Sewa Dump Truk 5 Ton 0.2500 Jam 70,000.00 17,500.00
TOTAL 34,250.00
1
Upah
Mandor 0.0750 O.H 97,900.00 7,342.50
Kepala Tukang 0.0750 O.H 93,500.00 7,012.50
Tukang 0.7500 O.H 74,800.00 56,100.00
Buruh Tak Terampil 1.5000 O.H 67,000.00 100,500.00
TOTAL 954,151.00
Upah
Mandor 0.0750 O.H 97,900.00 7,342.50
Kepala Tukang 0.0750 O.H 93,500.00 7,012.50
Tukang 0.7500 O.H 74,800.00 56,100.00
Buruh Tak Terampil 1.5000 O.H 67,000.00 100,500.00
TOTAL 925,166.20
Upah
Mandor 0.039 O.H 97,900.00 3,818.10
Kepala Tukang 0.039 O.H 93,500.00 3,646.50
Tukang 0.39 O.H 74,800.00 29,172.00
Buruh Tak Terampil 0.7800 O.H 67,000.00 52,260.00
TOTAL 678,528.60
Upah
Kepala Tukang 0.0100 O.H 93,500.00 935.00
Tukang 0.1000 O.H 74,800.00 7,480.00
Buruh Tak Terampil 0.3000 O.H 67,000.00 20,100.00
TOTAL 107,451.00
Upah
Mandor 0.0150 O.H 97,900.00 1,468.50
Kepala Tukang 0.0100 O.H 93,500.00 935.00
Tukang 0.1000 O.H 74,800.00 7,480.00
Buruh Tak Terampil 0.3000 O.H 67,000.00 20,100.00
TOTAL 105,902.40
Upah
Kepala Tukang 0.0100 O.H 93,500.00 935.00
Tukang 0.1000 O.H 74,800.00 7,480.00
Buruh Tak Terampil 0.3000 O.H 67,000.00 20,100.00
TOTAL 102,534.50
2
E. PEKERJAAN PLESTERAN SNI 2837 : 2008
1 Plester Halus t.1,5 cm ( 1 pc : 3 psr ) m2
Bahan
Semen PC 50 Kg 0.1555 Zak 60,000.00 9,331.20
Pasir Pasang/Plester 0.0230 m3 142,300.00 3,272.90
Upah
Kepala Tukang 0.0150 O.H 93,500.00 1,402.50
Tukang 0.1500 O.H 74,800.00 11,220.00
Buruh Tak Terampil 0.3000 O.H 67,000.00 20,100.00
TOTAL 45,326.60
Upah
Mandor 0.0150 O.H 97,900.00 1,468.50
Kepala Tukang 0.0150 O.H 93,500.00 1,402.50
Tukang 0.1500 O.H 74,800.00 11,220.00
Buruh Tak Terampil 0.3000 O.H 67,000.00 20,100.00
TOTAL 45,094.20
Upah
Kepala Tukang 0.0150 O.H 93,500.00 1,402.50
Tukang 0.1500 O.H 74,800.00 11,220.00
Buruh Tak Terampil 0.3000 O.H 67,000.00 20,100.00
TOTAL 42,643.10
4 Benangan (Skoning) m1
Bahan
Semen PC 50 Kg 0.0100 Zak 60,000.00 600.00
Pasir Pasang/Plester 0.0130 m3 142,300.00 1,849.90
Upah
Mandor 0.0040 O.H 97,900.00 391.60
Kepala Tukang 0.0400 O.H 93,500.00 3,740.00
Tukang 0.0400 O.H 74,800.00 2,992.00
Buruh Tak Terampil 0.0800 O.H 67,000.00 5,360.00
TOTAL 14,933.50
5 Acian m2
Bahan
Semen PC 50 Kg 0.0650 Zak 60,000.00 3,900.00
Upah
Kepala Tukang 0.0100 O.H 93,500.00 935.00
Tukang 0.1000 O.H 74,800.00 7,480.00
Buruh Tak Terampil 0.2000 O.H 67,000.00 13,400.00
TOTAL 25,715.00
Upah
Kepala Tukang 0.0200 O.H 93,500.00 1,870.00
Pekerja 0.2000 O.H 74,800.00 14,960.00
Buruh Tak Terampil 1.2000 O.H 67,000.00 80,400.00
TOTAL 681,560.54
3
2 Pek. Beton. K. 175 m3
Bahan
Semen PC 40 Kg 8.1500 Zak 53,000.00 431,950.00
Pasir Cor/Beton 0.4806 m3 265,300.00 127,509.81
Batu Pecah Mesin 2/3 cm 0.5416 m3 243,300.00 131,766.16
Upah
Mandor 0.0830 O.H 97,900.00 8,125.70
Kepala Tukang 0.0280 O.H 93,500.00 2,618.00
Pekerja 0.2750 O.H 74,800.00 20,570.00
Buruh Tak Terampil 1.6500 O.H 67,000.00 110,550.00
TOTAL 833,089.67
Upah
Mandor 0.0830 O.H 97,900.00 8,125.70
Kepala Tukang 0.0280 O.H 93,500.00 2,618.00
Pekerja 0.2750 O.H 74,800.00 20,570.00
Buruh Tak Terampil 1.6500 O.H 67,000.00 110,550.00
TOTAL 861,494.90
Upah
Mandor 0.0830 O.H 97,900.00 8,125.70
Kepala Tukang 0.0280 O.H 93,500.00 2,618.00
Pekerja 0.2750 O.H 74,800.00 20,570.00
Buruh Tak Terampil 1.6500 O.H 67,000.00 110,550.00
TOTAL 883,246.93
Upah
Mandor 0.0830 O.H 97,900.00 8,125.70
Kepala Tukang 0.0280 O.H 93,500.00 2,618.00
Pekerja 0.2750 O.H 74,800.00 20,570.00
Buruh Tak Terampil 1.6500 O.H 67,000.00 110,550.00
TOTAL 898,452.63
5 Pek. Beton. K. 300 m3
Bahan
Semen PC 40 Kg 10.3250 Zak 53,000.00 547,225.00
Pasir Cor/Beton 0.4256 m3 265,300.00 112,918.31
Batu Pecah Mesin 2/3 cm 0.5374 m3 243,300.00 130,741.74
Upah
Kepala Tukang 0.0280 O.H 93,500.00 2,618.00
Pekerja 0.2750 O.H 74,800.00 20,570.00
Buruh Tak Terampil 1.6500 O.H 67,000.00 110,550.00
TOTAL 924,623.05
6 Pek. Beton. K. 350 m3
Bahan
Semen PC 40 Kg 11.2000 Zak 53,000.00 593,600.00
Pasir Cor/Beton 0.4169 m3 265,300.00 110,596.94
Batu Pecah Mesin 2/3 cm 0.5263 m3 243,300.00 128,052.68
Upah
Kepala Tukang 0.0350 O.H 93,500.00 3,272.50
Pekerja 0.3500 O.H 74,800.00 26,180.00
Buruh Tak Terampil 2.1000 O.H 67,000.00 140,700.00
TOTAL 1,002,402.12
7 Pek. Pembesian Besi ( Polos / Ulir ) Kg
4
Bahan
Besi Polos/Ulir 1.0500 Kg 13,500.00 14,175.00
Kawat Ikat 0.0150 Kg 25,900.00 388.50
Upah
Kepala Tukang 0.0007 O.H 93,500.00 65.45
Pekerja 0.0070 O.H 74,800.00 523.60
Buruh Tak Terampil 0.0070 O.H 67,000.00 469.00
TOTAL 15,621.55
5
7 Pek. Pembesian Besi Wire Mesh M.6 Kg
Bahan
Wiremesh 1.0200 Kg 78,000.00 79,560.00
Kawat Ikat 0.0500 Kg 23,000.00 1,150.00
Upah
Mandor 0.0010 O.H 97,900.00 97.90
Kepala Tukang 0.0020 O.H 93,500.00 187.00
Pekerja 0.0250 O.H 74,800.00 1,870.00
Buruh Tak Terampil 0.0250 O.H 24,000.00 600.00
TOTAL 83,464.90
Upah
Kepala Tukang 0.0260 O.H 93,500.00 2,431.00
Pekerja 0.2600 O.H 74,800.00 19,448.00
Buruh Tak Terampil 0.5200 O.H 67,000.00 34,840.00
TOTAL 209,069.00
Upah
Kepala Tukang 0.0260 O.H 93,500.00 2,431.00
Pekerja 0.2600 O.H 74,800.00 19,448.00
Buruh Tak Terampil 0.5200 O.H 67,000.00 34,840.00
TOTAL 227,181.50
Upah
Kepala Tukang 0.0330 O.H 93,500.00 3,085.50
Pekerja 0.3300 O.H 74,800.00 24,684.00
Buruh Tak Terampil 0.6600 O.H 67,000.00 44,220.00
TOTAL 324,079.50
Upah
Kepala Tukang 0.0330 O.H 93,500.00 3,085.50
Pekerja 0.3300 O.H 74,800.00 24,684.00
Buruh Tak Terampil 0.6600 O.H 67,000.00 44,220.00
TOTAL 335,779.50
6
Upah
Kepala Tukang 0.0330 O.H 93,500.00 3,085.50
Pekerja 0.3300 O.H 74,800.00 24,684.00
Buruh Tak Terampil 0.6600 O.H 67,000.00 44,220.00
TOTAL 324,079.50
Upah
Mandor 0.0330 O.H 97,900.00 3,230.70
Kepala Tukang 0.0330 O.H 93,500.00 3,085.50
Pekerja 0.3300 O.H 74,800.00 24,684.00
Buruh Tak Terampil 0.6600 O.H 67,000.00 44,220.00
TOTAL 360,585.20
Upah
Kepala Tukang 0.0330 O.H 93,500.00 3,085.50
Pekerja 0.3300 O.H 74,800.00 24,684.00
Buruh Tak Terampil 0.6600 O.H 67,000.00 44,220.00
TOTAL 286,349.50
7
Pek. Begesteng Kolom 1.0000 m3 324,079.50 324,079.50
TOTAL 5,364,762.23
Upah
Mandor 0.1250 O.H 97,900.00 12,237.50
Sewa Alat
Sewa Crane 30 ton - Min. 8 Jam (Termasuk Mob/Demob
0.2180 Jam 139,800.00 30,476.40
Operator BBM)
Sewa Hammer Tiang Pancang min. 8 jam 0.2180 Jam 188,100.00 41,005.80
TOTAL 226,619.70
8
Pasir Pasang/Plester 0.0450 m3 142,300.00 6,403.50
Keramik Lantai Granito Salsa Pearl White Uk. 40x40 cm 1.0600 m2 206,800.00 219,208.00
Upah
Mandor 0.0350 O.H 97,900.00 3,426.50
Kepala Tukang 0.0350 O.H 93,500.00 3,272.50
Pekerja 0.3500 O.H 74,800.00 26,180.00
Buruh Tak Terampil 0.7000 O.H 67,000.00 46,900.00
TOTAL 325,618.50
Upah
Mandor 0.0350 O.H 97,900.00 3,426.50
Kepala Tukang 0.0350 O.H 93,500.00 3,272.50
Pekerja 0.3500 O.H 74,800.00 26,180.00
Buruh Tak Terampil 0.7000 O.H 67,000.00 46,900.00
TOTAL 368,760.50
Upah
Mandor 0.0350 O.H 97,900.00 3,426.50
Kepala Tukang 0.0350 O.H 93,500.00 3,272.50
Pekerja 0.3500 O.H 74,800.00 26,180.00
Buruh Tak Terampil 0.7000 O.H 67,000.00 46,900.00
TOTAL 339,185.50
Upah
Mandor 0.0350 O.H 97,900.00 3,426.50
Kepala Tukang 0.0350 O.H 93,500.00 3,272.50
Pekerja 0.3500 O.H 74,800.00 26,180.00
Buruh Tak Terampil 0.7000 O.H 67,000.00 46,900.00
TOTAL 202,212.50
Upah
Mandor 0.0450 O.H 97,900.00 4,405.50
Kepala Tukang 0.0450 O.H 93,500.00 4,207.50
Pekerja 0.4500 O.H 74,800.00 33,660.00
Buruh Tak Terampil 0.9000 O.H 67,000.00 60,300.00
TOTAL 210,334.40
Upah
9
Mandor 0.0250 O.H 97,900.00 2,447.50
Kepala Tukang 0.0750 O.H 93,500.00 7,012.50
Pekerja 0.1500 O.H 74,800.00 11,220.00
Buruh Tak Terampil 0.2500 O.H 67,000.00 16,750.00
TOTAL 315,492.00
Upah
Mandor 0.0010 O.H 97,900.00 97.90
Kepala Tukang 0.0020 O.H 93,500.00 187.00
Pekerja 0.0210 O.H 74,800.00 1,570.80
Buruh Tak Terampil 0.0210 O.H 67,000.00 1,407.00
TOTAL 23,063.70
3 Pengecatan list plafond m1
Bahan
Cat Tembok Dalam 0.0200 Kg 121,000.00 2,420.00
Upah
Kepala Tukang 0.0063 O.H 93,500.00 589.05
Pekerja 0.0630 O.H 74,800.00 4,712.40
Buruh Tak Terampil 0.0250 O.H 67,000.00 1,675.00
TOTAL 9,396.45
I. PEKERJAAN PENGECATAN
1 Pengecatan Dinding Dalam Baru m2
Bahan
Cat Tembok Dalam 0.1040 Kaleng 121,000.00 12,584.00
Kertas Gosok Halus no. 150 0.1000 Lbr 20,400.00 2,040.00
Plamir Tembok 0.1000 Kg 36,500.00 3,650.00
Upah
Kepala Tukang 0.0063 O.H 93,500.00 589.05
Pekerja 0.0630 O.H 74,800.00 4,712.40
Buruh Tak Terampil 0.0200 O.H 67,000.00 1,340.00
TOTAL 24,915.45
Upah
Kepala Tukang 0.0063 O.H 93,500.00 589.05
Pekerja 0.0630 O.H 74,800.00 4,712.40
Buruh Tak Terampil 0.0200 O.H 67,000.00 1,340.00
TOTAL 35,003.45
Upah
Kepala Tukang 0.0063 O.H 93,500.00 589.05
Pekerja 0.0630 O.H 74,800.00 4,712.40
Buruh Tak Terampil 0.0250 O.H 67,000.00 1,675.00
TOTAL 48,184.45
4 Water Proofing m2
Bahan
Waterproof 0.3500 Kg 85,000.00 29,750.00
Serat Fiber 1.0000 m2 10,100.00 10,100.00
Upah
Mandor 0.0025 O.H 97,900.00 244.75
Kepala Tukang 0.0075 O.H 93,500.00 701.25
Pekerja 0.0750 O.H 74,800.00 5,610.00
10
Buruh Tak Terampil 0.0500 O.H 67,000.00 3,350.00
TOTAL 49,756.00
RSNI-T-15-2002-
J. PEKERJAAN SANITASI Sanitair
1 Pek. Pipa Sanitasi PVC dia. 1/2" AW m1
Bahan
Pipa Plastik PVC Tipe AW Uk. 1/2 Pj. 4 mtr 0.1050 Btng 29,000.00 3,045.00
Perlengkapan 30% Harga Pipa 1.0000 Btng 8,700.00 8,700.00
Upah
Mandor 0.0018 O.H 97,900.00 176.22
Kepala Tukang 0.0060 O.H 93,500.00 561.00
Pekerja 0.0600 O.H 74,800.00 4,488.00
Buruh Tak Terampil 0.0360 O.H 67,000.00 2,412.00
TOTAL 19,382.22
Upah
Mandor 0.0018 O.H 97,900.00 176.22
Kepala Tukang 0.0060 O.H 93,500.00 561.00
Pekerja 0.0600 O.H 74,800.00 4,488.00
Buruh Tak Terampil 0.0360 O.H 67,000.00 2,412.00
TOTAL 22,217.22
Upah
Mandor 0.0018 O.H 97,900.00 176.22
Kepala Tukang 0.0060 O.H 93,500.00 561.00
Pekerja 0.0600 O.H 74,800.00 4,488.00
Buruh Tak Terampil 0.0360 O.H 67,000.00 2,412.00
TOTAL 32,837.22
Upah
Mandor 0.0018 O.H 97,900.00 176.22
Kepala Tukang 0.0060 O.H 93,500.00 561.00
Pekerja 0.0600 O.H 74,800.00 4,488.00
Buruh Tak Terampil 0.0360 O.H 67,000.00 2,412.00
TOTAL 57,137.22
Upah
Mandor 0.0027 O.H 97,900.00 264.33
Kepala Tukang 0.0090 O.H 93,500.00 841.50
Pekerja 0.0900 O.H 74,800.00 6,732.00
Buruh Tak Terampil 0.0540 O.H 67,000.00 3,618.00
TOTAL 40,135.83
Upah
Mandor 0.0041 O.H 97,900.00 264.33
Kepala Tukang 0.0135 O.H 93,500.00 841.50
Pekerja 0.135 O.H 74,800.00 6,732.00
Buruh Tak Terampil 0.081 O.H 67,000.00 3,618.00
TOTAL 52,855.83
11
7 Pek. Pipa Sanitasi PVC dia. 4" type C m1
Bahan
Pipa Plastik PVC Tipe C Uk. 4 inchi Pj.4mtr 0.3000 Btng 89,000.00 26,700.00
Perlengkapan 30% Harga Pipa 1.0000 Btng 26,700.00 26,700.00
Upah
Mandor 0.0041 O.H 97,900.00 401.39
Kepala Tukang 0.0135 O.H 93,500.00 1,262.25
Pekerja 0.135 O.H 74,800.00 10,098.00
Buruh Tak Terampil 0.081 O.H 67,000.00 5,427.00
TOTAL 70,588.64
Upah
Mandor 0.0041 O.H 97,900.00 401.39
Kepala Tukang 0.0135 O.H 93,500.00 1,262.25
Pekerja 0.135 O.H 74,800.00 10,098.00
Buruh Tak Terampil 0.081 O.H 67,000.00 5,427.00
TOTAL 83,829.54
Upah
Mandor 0.0041 O.H 97,900.00 401.39
Kepala Tukang 0.0135 O.H 93,500.00 1,262.25
Pekerja 0.135 O.H 74,800.00 10,098.00
Buruh Tak Terampil 0.081 O.H 67,000.00 5,427.00
TOTAL 95,130.94
Upah
Mandor 0.0041 O.H 97,900.00 401.39
Kepala Tukang 0.0135 O.H 93,500.00 1,262.25
Pekerja 0.135 O.H 74,800.00 10,098.00
Buruh Tak Terampil 0.081 O.H 67,000.00 5,427.00
TOTAL 127,923.68
Upah
Kepala Tukang 0.0300 O.H 93,500.00 2,805.00
Pekerja 0.1500 O.H 74,800.00 11,220.00
TOTAL 64,725.00
Upah
Kepala Tukang 0.0300 O.H 93,500.00 2,805.00
Pekerja 0.1500 O.H 74,800.00 11,220.00
TOTAL 75,985.00
Upah
12
Mandor 0.1600 O.H 97,900.00 15,664.00
Kepala Tukang 0.1600 O.H 93,500.00 14,960.00
Pekerja 1.1000 O.H 74,800.00 82,280.00
Buruh Tak Terampil 3.3000 O.H 67,000.00 221,100.00
TOTAL 3,933,340.00
Upah
Mandor 0.1500 O.H 97,900.00 14,685.00
Kepala Tukang 0.1600 O.H 93,500.00 14,960.00
Pekerja 1.5000 O.H 74,800.00 112,200.00
Buruh Tak Terampil 1.0000 O.H 67,000.00 67,000.00
TOTAL 681,668.00
15 Pas.Wastafel Bh
Bahan
Semen PC 50 Kg 0.1200 Zak 60,000.00 7,200.00
Pasir Pasang/Plester 0.0100 m3 142,300.00 1,423.00
Wastafel 1.0000 Bh 464,000.00 464,000.00
Perlengkapan 5% Harga Closed 0.1200 Bh 464,000.00 55,680.00
Upah
Mandor 0.1000 O.H 97,900.00 9,790.00
Kepala Tukang 0.1500 O.H 93,500.00 14,025.00
Pekerja 1.4500 O.H 74,800.00 108,460.00
Buruh Tak Terampil 1.2000 O.H 67,000.00 80,400.00
TOTAL 740,978.00
16 Avoor/Floordrain Bh
Bahan
Avoor/Floordrain 1.0000 Bh 68,750.00 68,750.00
Upah
Mandor 0.0050 O.H 97,900.00 489.50
Kepala Tukang 0.0100 O.H 93,500.00 935.00
Pekerja 0.1000 O.H 74,800.00 7,480.00
Buruh Tak Terampil 0.0100 O.H 67,000.00 670.00
TOTAL 78,324.50
Upah
Mandor 0.0300 O.H 97,900.00 2,937.00
Kepala Tukang 0.2000 O.H 93,500.00 18,700.00
Pekerja 2.0000 O.H 74,800.00 149,600.00
Buruh Tak Terampil 0.6000 O.H 67,000.00 40,200.00
TOTAL 546,737.00
3 P1 Unit
Aluminium Putih Uk. 4 x 10, Profil 4 inchi 13.0800 m1 108,000.00 1,412,640.00
Kaca Polos 5 mm 21.9700 m2 87,000.00 1,911,390.00
Sealant 8.0000 Tube 60,300.00 482,400.00
Engsel Pintu 3.0000 set 66,000.00 198,000.00
Kunci Tanam 1.0000 set 81,000.00 81,000.00
TOTAL 4,085,430.00
13
3 P2 Unit
Aluminium Putih Uk. 4 x 10, Profil 4 inchi 13.1600 m1 108,000.00 1,421,280.00
Slimar Aluminium 3/8 6.6400 m1 90,000.00 597,600.00
Kaca Polos 5 mm 11.0000 m2 87,000.00 957,000.00
Sealant 8.0000 Tube 60,300.00 482,400.00
Engsel Pintu 3.0000 set 66,000.00 198,000.00
Kunci Tanam 1.0000 set 81,000.00 81,000.00
TOTAL 3,737,280.00
4 P3 Unit
Aluminium Putih Uk. 4 x 10, Profil 4 inchi 9.5600 m1 108,000.00 1,032,480.00
Kaca Polos 5 mm 1.3200 m2 87,000.00 114,840.00
Pintu Kayu Solid 1.0000 Unit 276,250.00 276,250.00
Engsel Pintu 3.0000 set 66,000.00 198,000.00
Kunci Tanam 1.0000 set 81,000.00 81,000.00
TOTAL 1,702,570.00
5 P4 Unit
Aluminium Putih Uk. 4 x 10, Profil 4 inchi 9.5600 m1 87,000.00 831,720.00
Pintu Kayu Solid 1.0000 m1 276,250.00 276,250.00
Engsel Pintu 3.0000 m2 66,000.00 198,000.00
Kunci Tanam 1.0000 Unit 81,000.00 81,000.00
TOTAL 1,386,970.00
6 J1 Unit
Aluminium Putih Uk. 4 x 10, Profil 4 inchi 29.0000 m1 87,000.00 2,523,000.00
Kaca Polos 5 mm 15.0000 m2 87,000.00 1,305,000.00
TOTAL 3,828,000.00
7 J2 Unit
Aluminium Putih Uk. 4 x 10, Profil 4 inchi 31.0000 m1 87,000.00 2,697,000.00
Kaca Polos 5 mm 18.0000 m2 87,000.00 1,566,000.00
TOTAL 4,263,000.00
8 J3 Unit
Aluminium Putih Uk. 4 x 10, Profil 4 inchi 9.5600 m1 87,000.00 831,720.00
Slimar Aluminium 3/8 6.6400 m1 90,000.00 597,600.00
Kaca Polos 5 mm 31.0000 m2 87,000.00 2,697,000.00
Engsel Jendela 4.0000 pasang 20,000.00 80,000.00
TOTAL 4,206,320.00
9 B1 Unit
Aluminium Putih Uk. 4 x 10, Profil 4 inchi 3.4000 m1 87,000.00 295,800.00
Kaca Polos 5 mm 1.2000 m2 20,000.00 24,000.00
TOTAL 319,800.00
L. PEKERJAAN ATAP
1 Pekerjaan Atap Genteng Metal Zincalume m2
Bahan
Atap Metal Zincalume 1.6000 Lbr 46,400.00 74,240.00
Peredam Panas (aluminium foil) 1.0500 m2 24,000.00 25,200.00
Perlengkapan 5% dari Harga Genteng 0.0500 Lbr 2,320.00 116.00
Upah
Mandor 0.0080 O.H 97,900.00 783.20
Kepala Tukang 0.0080 O.H 93,500.00 748.00
Pekerja 0.0750 O.H 74,800.00 5,610.00
Buruh Tak Terampil 0.1500 O.H 67,000.00 10,050.00
TOTAL 116,747.20
Upah
Mandor 0.0020 O.H 97,900.00 195.80
Kepala Tukang 0.0200 O.H 93,500.00 1,870.00
Pekerja 0.2000 O.H 74,800.00 14,960.00
Buruh Tak Terampil 0.4000 O.H 67,000.00 26,800.00
TOTAL 83,047.09
14
Bahan
15
Clasilank 1/30 1.0500 m1 27,500.00 28,875.00
Perlengkapan 5% dari Garga Bubungan 0.0500 m1 1,375.00 68.75
Upah
Mandor 0.0050 O.H 97,900.00 489.50
Kepala Tukang 0.0200 O.H 93,500.00 1,870.00
Pekerja 0.2000 O.H 74,800.00 14,960.00
Buruh Tak Terampil 0.1000 O.H 67,000.00 6,700.00
TOTAL 52,963.25
Upah
Mandor 0.0050 O.H 97,900.00 489.50
Kepala Tukang 0.0200 O.H 93,500.00 1,870.00
Pekerja 0.2000 O.H 74,800.00 14,960.00
Buruh Tak Terampil 0.1000 O.H 67,000.00 6,700.00
TOTAL 214,750.75
Upah:
Mandor 0.003 O.H 97,900.00 293.70
Kepala Tukang 0.006 O.H 93,500.00 561.00
Pekerja 0.06 O.H 74,800.00 4,488.00
Buruh Tak Terampil 0.06 O.H 67,000.00 4,020.00
TOTAL 33,512.70
Upah
Mandor 0.0500 O.H 97,900.00 4,895.00
Kepala Tukang 0.3000 O.H 93,500.00 28,050.00
Pekerja 2.0000 O.H 74,800.00 149,600.00
Buruh Tak Terampil 2.0000 O.H 67,000.00 134,000.00
TOTAL 1,443,684.00
16
O. Pekerjaan Sunscreen Aluminium SNI 7393:2008 No. 6.9
m2
Bahan
Sunscreen Aluminium 1.0000 m2 350,000.00 350,000.00
Upah
Mandor 0.0040 O.H 97,900.00 391.60
Kepala Tukang 0.0800 O.H 93,500.00 7,480.00
Pekerja 0.8000 O.H 74,800.00 59,840.00
Buruh Tak Terampil 0.0800 O.H 67,000.00 5,360.00
TOTAL 423,071.60
P. Pagar Sementara Seng Gelombang T 2 m m1
Bahan
Dolken kayu gelam dia 8-10 cm, panjang 4m 1.25 bt 30,300.00 37,875.00
Semen PC 50 Kg 0.1 zak 60,000.00 6,000.00
Seng Gelombang BJLS 30, Uk. (0,8 x 1,50) 1.2 m1 63,000.00 75,600.00
Pasir Cor/Beton 0.005 m3 265,300.00 1,326.50
Batu Pecah Mesin 2/3 cm 0.009 m3 243,300.00 2,189.70
Kayu Meranti Usuk 4/6, 5/7 0.072 m3 3,900,000.00 280,800.00
Paku Biasa 2 - 5 inchi 0.06 kg 20,640.00 1,238.40
Cat Meni Besi 0.45 kg 36,300.00 16,335.00
Upah
Mandor 0.0200 O.H 97,900.00 1,958.00
Kepala Tukang 0.0200 O.H 93,500.00 1,870.00
Pekerja 0.2000 O.H 74,800.00 14,960.00
Buruh Tak Terampil 0.4000 O.H 67,000.00 26,800.00
TOTAL 466,952.60
Q. INSTALASI LISTRIK
1 Pek.Instalasi Titik Lampu DL 24 W
Bahan:
Kabel NYM 3 x 2,5 mm 24 m1 12,300.00 295,200.00
Isolator 4 Unit 7,800.00 31,200.00
Fiting Plafon 1 Buah 15,500.00 15,500.00
Pipa Pralon 5/8 3 Btng 7,400.00 22,200.00
T Doos Pvc 3 Buah 3,900.00 11,700.00
Lampu philiphs downlight LED inbow 24 watt 1 Buah 260,000.00 260,000.00
Upah:
Kepala Tukang 0.05 O.H 93,500.00 4,675.00
Pekerja 0.5 O.H 74,800.00 37,400.00
Buruh Tak Terampil 0.3 O.H 67,000.00 20,100.00
TOTAL 697,975.00
Upah:
Kepala Tukang 0.05 O.H 93,500.00 4,675.00
Pekerja 0.5 O.H 74,800.00 37,400.00
Buruh Tak Terampil 0.3 O.H 67,000.00 20,100.00
TOTAL 510,875.00
17
Upah:
Kepala Tukang 0.05 O.H 93,500.00 4,675.00
Pekerja 0.5 O.H 74,800.00 37,400.00
Buruh Tak Terampil 0.3 O.H 67,000.00 20,100.00
TOTAL 497,875.00
Upah:
Kepala Tukang 0.05 O.H 93,500.00 4,675.00
Pekerja 0.2 O.H 74,800.00 14,960.00
Buruh Tak Terampil 0.001 O.H 67,000.00 67.00
TOTAL 233,702.00
Upah:
Kepala Tukang 0.05 O.H 93,500.00 4,675.00
Pekerja 0.2 O.H 74,800.00 14,960.00
Buruh Tak Terampil 0.001 O.H 67,000.00 67.00
TOTAL 192,402.00
Upah:
Kepala Tukang 0.05 O.H 93,500.00 4,675.00
Pekerja 0.2 O.H 74,800.00 14,960.00
Buruh Tak Terampil 0.001 O.H 67,000.00 67.00
TOTAL 52,102.00
Upah:
Kepala Tukang 0.05 O.H 93,500.00 4,675.00
Pekerja 0.2 O.H 74,800.00 14,960.00
Buruh Tak Terampil 0.001 O.H 67,000.00 67.00
TOTAL 69,102.00
Upah:
Kepala Tukang 0.05 O.H 93,500.00 4,675.00
Pekerja 0.2 O.H 74,800.00 14,960.00
Buruh Tak Terampil 0.001 O.H 67,000.00 67.00
TOTAL 178,702.00
R. TANAMAN
1 Rumput Gajah
Bahan:
Pupuk kandang 0.0400 krg 20,000.00 800.00
Rumput Gajah 0.5000 m2 30,000.00 15,000.00
Upah:
Mandor 0.0040 O.H 97,900.00 391.60
Buruh Tak Terampil 0.0400 O.H 67,000.00 2,680.00
TOTAL 18,871.60
18
2 pohon tinggi 2m
Bahan:
Pupuk kandang 0.08 krg 20,000.00 1,600.00
pohon 1 bh 550,000.00 550,000.00
Upah:
Mandor 0.0025 O.H 97,900.00 244.75
Buruh Tak Terampil 0.025 O.H 67,000.00 1,675.00
TOTAL 553,519.75
3 pohon perdu
Bahan:
Pupuk kandang 0.0400 krg 20,000.00 800.00
pohon perdu 1.0000 bh 55,000.00 55,000.00
Upah:
Mandor 0.0020 O.H 97,900.00 195.80
Buruh Tak Terampil 0.02 O.H 67,000.00 1,340.00
TOTAL 57,335.80
S. TAMBAHAN
1 Papan nama proyek
Bahan: Ls
Kayu Meranti Usuk 4/6, 5/7 0.0350 Btg 3,900,000.00 136,500.00
Paku Biasa 2 - 5 inchi 0.6000 Kg 20,640.00 12,384.00
Seng Talang BJLS 40 Lbr 90 1.4 m1 33,200.00 46,480.00
Cat Kayu 1.5 Kg 50,100.00 75,150.00
Semen PC 50 Kg 0.336 Zak 60,000.00 20,160.00
Pasir Cor/Beton 0.027 m3 265,300.00 7,163.10
Batu Pecah Mesin 2/3 cm 0.041 m3 243,300.00 9,975.30
TOTAL 307,812.40
2 Plat lantai smartdeck
Bahan: m3
Wiremesh 1.3 m2 78,000.00 101,400.00
Panel Beton Pracetak 8.67 m2 125,000.00 1,083,750.00
Pek. Beton. K. 300 1 m3 924,623.05 924,623.05
Paku Reng 3.2 kg 15,000.00 48,000.00
Kawat Bendrat 2.25 kg 25,900.00 58,275.00
Dolken kayu gelam dia 8-10 cm, panjang 4m 25 Btg 30,300.00 757,500.00
Upah
Mandor 0.1800 O.H 97,900.00 17,622.00
Kepala Tukang 0.1900 O.H 93,500.00 17,765.00
Pekerja 1.7400 O.H 74,800.00 130,152.00
Buruh Tak Terampil 4.7700 O.H 67,000.00 319,590.00
TOTAL 3,458,677.05
Upah
Buruh Tak Terampil 0.38 O.H 67,000.00 25,125.00
Pekerja 0.13 O.H 74,800.00 9,350.00
Kepala Tukang 0.01 O.H 93,500.00 1,122.00
Mandor 0.02 O.H 97,900.00 1,860.10
TOTAL Err:509
Upah
Buruh Tak Terampil 0.12 O.H 67,000.00 8,040.00
Pekerja 0.12 O.H 74,800.00 8,976.00
Kepala Tukang 0.02 O.H 93,500.00 1,402.50
19
Mandor 0.01 O.H 97,900.00 489.50
TOTAL 343,908.00
20
RENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN PEMBANGUNAN GEDUNG KANTOR DPRD SURAKARTA
I PEKERJAAN PERSIAPAN
1 Pagar Sementara Seng Gelombang T 2 m 152.00 m1 Rp 233,476.30 Rp 35,488,397.60
2 Pembersihan Lapangan dan Perataan Tanah 1408.00 m 2 Rp 11,595.00 Rp 16,325,760.00
3 Pembuatan Direksi Keet 1.00 Ls Rp 3,898,789.00 Rp 3,898,789.00
4 Uitset dan Bouwplank 144.00 m1 Rp 93,197.35 Rp 13,420,418.40
5 Papan Nama Proyek 1.00 Ls Rp 307,812.40 Rp 307,812.40
JUMLAH Rp 69,441,177.40
TOTAL PEKERJAAN PERSIAPAN Rp 69,441,177.4
II PEKERJAAN TANAH
1 Galian Tanah Pondasi 1360.71 m3 Rp 52,697.50 Rp 71,706,120.62
2 Urugan Pasir Bawah Pondasi 65.29 m 3
Rp 232,279.00 Rp 15,166,076.61
3 Urugan Pasir Bawah Lantai 115.00 m3 Rp 232,279.00 Rp 26,712,085.00
4 Urugan Tanah Kembali 928.47 m3 Rp 47,195.00 Rp 43,819,224.24
5 Pengangkutan Tanah Ke luar Proyek 432.24 m 3
Rp 34,250.00 Rp 14,804,228.56
JUMLAH Rp 172,207,735.03
TOTAL PEKERJAAN TANAH Rp 172,207,735.0
III PEKERJAAN PONDASI
1 Lantai Kerja Bawah Pondasi t= 5 cm 32.65 m3 Rp 681,560.54 Rp 22,250,395.72
2 Beton Footplate FP1 259.92 m3 Rp 4,230,463.49 Rp 1,099,582,071.46
3 Beton Footplate FP2 1.25 m3 Rp 4,230,463.49 Rp 5,288,079.37
6 Beton Kolom Pedestal 23.42 m 3
Rp 5,364,762.23 Rp 125,664,190.47
7 Beton Sloof 25/35 53.90 m3 Rp 4,094,959.36 Rp 220,718,309.60
JUMLAH Rp 1,473,503,046.63
TOTAL PEKERJAAN PONDASI Rp 1,473,503,046.6
IV PEKERJAAN STRUKTUR
A LANTAI 1
1 Kolom K1 60x40 39.07 m3 Rp 10,170,908.52 Rp 397,397,737.71
2 Kolom K4 40x40 22.50 m3 Rp 10,170,908.52 Rp 228,804,758.08
4 Kolom Praktis 15x15 1.25 m3 Rp 10,170,908.52 Rp 12,700,922.02
5 Tangga Beton 6.20 m 3
Rp 3,747,844.64 Rp 23,251,628.15
6 Bordes Tangga Beton 2.17 m3 Rp 3,747,844.64 Rp 8,123,453.26
7 Pelat Lantai 115.00 m3 Rp 5,363,732.75 Rp 616,829,266.57
JUMLAH Rp 1,287,107,765.79
B LANTAI 2
1 Kolom K1 60x40 39.07 m3 Rp 10,170,908.52 Rp 397,397,737.71
2 Kolom K4 40X40 21.31 m3 Rp 10,170,908.52 Rp 216,762,402.39
3 Kolom Praktis 15x15 2.00 m3 Rp 10,170,908.52 Rp 20,321,475.22
4 Balok B1 35x55 9.24 m3 Rp 7,515,820.45 Rp 69,446,180.96
5 Balok B2 30x50 35.70 m 3
Rp 7,515,820.45 Rp 268,314,790.08
6 Balok B3 30x40 1.62 m3 Rp 7,515,820.45 Rp 12,175,629.13
7 Balok B5 30x45 33.48 m3 Rp 7,515,820.45 Rp 251,629,668.68
8 Balok B6 25x40 3.15 m3 Rp 7,515,820.45 Rp 23,674,834.42
9 Balok BA1 20x30 0.54 m3 Rp 7,515,820.45 Rp 4,058,543.04
10 Balok BA2 20x35 12.60 m3 Rp 7,515,820.45 Rp 94,699,337.68
11 Balok BA3 20x35 1.40 m3 Rp 7,515,820.45 Rp 10,522,148.63
12 Balok BA4 20x35 0.28 m3 Rp 7,515,820.45 Rp 2,104,429.73
13 Plat Lantai tb 12 cm 124.20 m3 Rp 5,363,732.75 Rp 666,175,607.90
15 Tangga Beton 6.20 m3 Rp 3,747,844.64 Rp 23,251,628.15
16 Bordes Tangga Beton 2.17 m3 Rp 3,747,844.64 Rp 8,123,453.26
JUMLAH Rp 2,068,657,867.00
C LANTAI 3
1 Kolom K3 45X45 39.60 m3 Rp 10,170,908.52 Rp 402,767,977.41
2 Kolom K4 35x35 4.20 m3 Rp 10,170,908.52 Rp 42,717,815.79
3 Kolom Praktis 15x15 1.60 m3 Rp 10,170,908.52 Rp 16,305,237.72
4 Balok B1 35x55 9.24 m3 Rp 7,515,820.45 Rp 69,446,180.96
5 Balok B2 30x50 35.70 m3 Rp 7,515,820.45 Rp 268,314,790.08
6 Balok B3 30x40 1.62 m3 Rp 7,515,820.45 Rp 12,175,629.13
7 Balok BA1 25x35 0.90 m 3
Rp 7,515,820.45 Rp 6,764,238.41
8 Balok BA2 20x35 13.44 m3 Rp 7,515,820.45 Rp 101,012,626.86
9 Balok BA3 25x35 1.40 m3 Rp 7,515,820.45 Rp 10,522,148.63
10 Balok BA4 15x30 0.35 m 3
Rp 7,515,820.45 Rp 2,630,537.16
11 Plat Lantai tb 12 cm 129.30 m3 Rp 5,363,732.75 Rp 693,530,644.94
12 Tangga Beton 29.39 m3 Rp 3,747,844.64 Rp 110,156,649.69
13 Bordes Tangga Beton 2.17 m3 Rp 3,747,844.64 Rp 8,123,453.26
JUMLAH Rp 1,744,467,930.03
E LANTAI ATAP
1 Ring Balk 78.40 m3 Rp 3,798,776.00 Rp 297,824,038.40
2 Plat Atap tb 10 cm 16.80 m3 Rp 5,363,732.75 Rp 90,110,710.25
3 Pekerjaan Baja Profil 14040.63 Kg Rp 57,500.00 Rp 807,336,052.50
4 Pasangan Rangka Baja 4358.46 Kg Rp 35,450.00 Rp 154,507,548.80
5 Pasangan Genteng Metal 1099.28 m' Rp 116,747.20 Rp 128,337,862.02
6 Pasangan Listplank 196.00 m' Rp 52,963.25 10,380,797.00
7 Pasangan Bubungan Genteng Metal 115.20 m' Rp 83,047.09 Rp 9,567,024.77
JUMLAH Rp 1,498,064,033.73
TOTAL PEKERJAAN STRUKTURAL Rp 6,598,297,596.6
V PEKERJAAN ARSITEKTURAL
A LANTAI 1 TOTAL LANTAI 1 Rp 1,300,888,343.88
A.1 PEKERJAAN PASANGAN
1 Pasangan Bata Biasa 1 Pc : 5 Ps 872.39 m2 Rp 102,534.50 Rp 89,450,482.59
2 Pasangan Bata Trasram 1 Pc : 3 Ps 75.58 m2 Rp 107,451.00 Rp 8,121,146.58
3 Plesteran Biasa 1:5 t= 1,5 cm 1744.79 m2 Rp 42,643.10 Rp 74,403,169.16
4 Plesteran Trasram 1:3 t= 1,5 cm 151.16 m2 Rp 45,326.60 Rp 6,851,568.86
5 Acian 1895.95 m2 Rp 25,715.00 Rp 48,754,302.82
JUMLAH Rp 227,580,670.01
A.2 PEKERJAAN LANTAI DAN KERAMIK
1 Ps. Granit Tile 40x40 cm polos 484.00 m2 Rp 325,618.50 Rp 157,599,354.00
2 Ps. Granit Tile 40x40 cm motif 562.00 m 2
Rp 368,760.50 Rp 207,243,401.00
3 Ps. Keramik KM/WC 20x20 cm 104.00 m2 Rp 202,212.50 Rp 21,030,100.00
4 Ps. Dinding Keramik KM/WC 20x25 cm 336.00 m2 Rp 210,334.40 Rp 70,672,358.40
JUMLAH Rp 456,545,213.40
A.3 PEKERJAAN KUSEN
1 P1 2.00 Unit Rp 4,085,430.00 Rp 8,170,860.00
2 P2 11.00 Unit Rp 3,737,280.00 Rp 41,110,080.00
3 P3 4.00 Unit Rp 1,702,570.00 Rp 6,810,280.00
4 P4 4.00 Unit Rp 1,386,970.00 Rp 5,547,880.00
5 J1 22.00 Unit Rp 3,828,000.00 Rp 84,216,000.00
JUMLAH Rp 145,855,100.00
A.4 PEKERJAAN PLAFON
1 Ps. Plafon Gypsum 1107.50 m2 Rp 315,492.00 Rp 349,407,390.00
2 Pasang List Plafon Gypsum 534.50 m1 Rp 23,063.70 Rp 12,327,547.65
JUMLAH Rp 361,734,937.65
A.5 PEKERJAAN PENGECATAN
1 Pengecatan Dinding Dalam 1544.31 m2 Rp 24,915.45 Rp 38,477,128.76
2 Pengecatan Dinding Luar Westhershield 351.64 m2 Rp 35,003.45 Rp 12,308,613.16
3 Pengecatan Plafon 1107.50 m 2
Rp 48,184.45 Rp 53,364,278.38
4 Pengecatan List Plafon 534.50 m1 Rp 9,396.45 Rp 5,022,402.53
JUMLAH Rp 109,172,422.82
B LANTAI 2 TOTAL LANTAI 2 Rp 1,210,852,757.17
B.1 PEKERJAAN PASANGAN
1 Pasangan Bata Biasa 1 Pc : 5 Ps 823.26 m2 Rp 102,534.50 Rp 84,412,039.80
2 Pasangan Bata Trasram 1 Pc : 3 Ps 75.58 m2 Rp 107,451.00 Rp 8,121,146.58
3 Plesteran Biasa 1:5 t= 1,5 cm 1646.51 m2 Rp 42,643.10 Rp 70,212,290.58
4 Plesteran Trasram 1:3 t= 1,5 cm 151.16 m2 Rp 45,326.60 Rp 6,851,568.86
5 Acian 1797.67 m2 Rp 25,715.00 Rp 46,227,084.05
JUMLAH Rp 215,824,129.86
B.2 PEKERJAAN LANTAI DAN KERAMIK
1 Ps. Granit Tile 40x40 cm polos 657.00 m2 Rp 325,618.50 Rp 213,931,354.50
2 Ps. Granit Tile 40x40 cm motif 359.00 m 2
Rp 368,760.50 Rp 132,385,019.50
3 Ps. Keramik KM/WC 20x20 cm 104.00 m2 Rp 202,212.50 Rp 21,030,100.00
4 Ps. Dinding Keramik KM/WC 20x20 cm 336.00 m2 Rp 210,334.40 Rp 70,672,358.40
JUMLAH Rp 438,018,832.40
B.3 PEKERJAAN KUSEN
1 P2 1.00 Unit Rp 3,737,280.00 Rp 3,737,280.00
2 P3 4.00 Unit Rp 1,702,570.00 Rp 6,810,280.00
3 P4 10.00 Unit Rp 1,386,970.00 Rp 13,869,700.00
4 J1 21.00 Unit Rp 3,828,000.00 Rp 80,388,000.00
JUMLAH Rp 104,805,260.00
B.4 PEKERJAAN PLAFON
1 Ps. Plafon Gypsum 1065.00 m2 Rp 315,492.00 Rp 335,998,980.00
2 Pasang List Plafon Gypsum 1/12 503.00 m1 Rp 23,063.70 Rp 11,601,041.10
JUMLAH Rp 347,600,021.10
B.5 PEKERJAAN PENGECATAN
1 Pengecatan Dinding Dalam 1423.77 m2 Rp 24,915.45 Rp 35,473,870.25
2 Pengecatan Dinding Luar Westhershield 373.90 m2 Rp 35,003.45 Rp 13,087,789.96
3 Pengecatan Plafon 1065.00 m 2
Rp 48,184.45 Rp 51,316,439.25
4 Pengecatan List Plafon 503.00 m1 Rp 9,396.45 Rp 4,726,414.35
JUMLAH Rp 104,604,513.80
C LANTAI 3 TOTAL LANTAI 3 Rp 1,169,959,913.22
C.1 PEKERJAAN PASANGAN
1 Pasangan Bata Biasa 1 Pc : 5 Ps 681.55 m2 Rp 102,534.50 Rp 69,882,644.81
2 Pasangan Bata Trasram 1 Pc : 3 Ps 75.58 m2 Rp 107,451.00 Rp 8,121,146.58
3 Plesteran Biasa 1:5 t= 1,5 cm 1363.11 m2 Rp 42,643.10 Rp 58,127,022.83
4 Plesteran Trasram 1:3 t= 1,5 cm 151.16 m2 Rp 45,326.60 Rp 6,851,568.86
5 Acian 1514.27 m2 Rp 25,715.00 Rp 38,939,324.48
JUMLAH Rp 181,921,707.55
C.2 PEKERJAAN LANTAI DAN KERAMIK
1 Ps. Granit Tile 40x40 cm polos 643.00 m2 Rp 325,618.50 Rp 209,372,695.50
2 Ps. Granit Tile 40x40 cm motif 373.00 m2 Rp 368,760.50 Rp 137,547,666.50
3 Ps. Keramik KM/WC 20x20 cm 104.00 m 2
Rp 202,212.50 Rp 21,030,100.00
4 Ps. Dinding Keramik KM/WC 20x20 cm 336.00 m2 Rp 210,334.40 Rp 70,672,358.40
JUMLAH Rp 438,622,820.40
C.3 PEKERJAAN KUSEN
1 P2 1.00 Unit Rp 3,737,280.00 Rp 3,737,280.00
2 P3 4.00 Unit Rp 1,702,570.00 Rp 6,810,280.00
3 P4 7.00 Unit Rp 1,386,970.00 Rp 9,708,790.00
4 J1 11.00 Unit Rp 3,828,000.00 Rp 42,108,000.00
5 J2 10.00 Unit Rp 4,263,000.00 Rp 42,630,000.00
JUMLAH Rp 104,994,350.00
C.4 PEKERJAAN PLAFON
1 Ps. Plafon Gypsum 1065.00 m2 Rp 315,492.00 Rp 335,998,980.00
2 Pasang List Plafon Gypsum 1/12 491.50 m 1
Rp 23,063.70 Rp 11,335,808.55
JUMLAH Rp 347,334,788.55
C.5 PEKERJAAN PENGECATAN
1 Pengecatan Dinding Dalam 1174.97 m2 Rp 24,915.45 Rp 29,274,781.71
2 Pengecatan Dinding Luar Westhershield 339.30 m2 Rp 35,003.45 Rp 11,876,670.59
3 Pengecatan Plafon 1065.00 m2 Rp 48,184.45 Rp 51,316,439.25
4 Pengecatan List Plafon 491.50 m 1
Rp 9,396.45 Rp 4,618,355.18
JUMLAH Rp 97,086,246.72
TOTAL PEKERJAAN ARSITEKTURAL Rp 3,681,701,014.3
VI PEKERJAAN MEP
A LANTAI 1 TOTAL LANTAI 1 Rp 124,206,475.65
A.1 PEKERJAAN LISTRIK
1 Pek.Instalasi titik lampu DL 24 watt 20 titik Rp 697,975.00 Rp 13,959,500.00
2 Pek.Instalasi titik lampu DL 18 watt 22 titik Rp 510,875.00 Rp 11,239,250.00
3 Pek.Instalasi titik lampu DL 12 watt 16 titik Rp 497,875.00 Rp 7,966,000.00
4 Pek.Instalasi stop kontak 29 titik Rp 192,402.00 Rp 5,579,658.00
5 Pekerjaan saklar ganda 20 titik Rp 69,102.00 Rp 1,382,040.00
6 Pekerjaan saklar tunggal 5 titik Rp 52,102.00 Rp 260,510.00
7 pekerjaan mcb box 10 bh Rp 178,702.00 Rp 1,787,020.00
JUMLAH Rp 42,173,978.00
V. Acian
Acian 1895.95 m2
2 LANTAI 2
I. Pasangan Bata Biasa 1 Pc : 5 Ps
Pasangan Bata Biasa 1 Pc : 5 Ps 297.95 m 3.7 m 1102.415 m2
Pengurang
P2 0 bh 0.9 m 2.3 m 0.00 m2
P3 4 bh 0.7 m 2.1 m 5.88 m2
P4 10 bh 1.2 m 2.3 m 27.60 m2
J1 21 bh 3 m 2.7 m 170.10 m2
Trasram 75.58 m2
823.26 m2
II. Pasangan Bata Trasram 1 Pc : 3 Ps
Pasangan Bata Trasram 1 Pc : 3 Ps 4 19.45 m 1.00 m 77.8 m2
Pengurang 8 0.6 m 0.40 m 1.92
Kolom Praktis 2 bh 0.15 m 1 m 0.30 m2
75.58 m2
III. Plesteran Biasa 1:5 t= 1,5 cm
Plesteran Biasa 1:5 t= 1,5 cm 1646.51 m2
V. Acian
Acian 1797.67 m2
2 LANTAI 3
I. Pasangan Bata Biasa 1 Pc : 5 Ps
Pasangan Bata Biasa 1 Pc : 5 Ps 267.325 m 3.7 m 989.1025 m2
Pengurang
P2 1 bh 0.9 m 2.3 m 2.07 m2
P3 4 bh 0.7 m 2.1 m 5.88 m2
P4 7 bh 1.2 m 2.3 m 19.32 m2
J1 11 bh 3 m 2.7 m 89.10 m2
J2 10 bh 3.4 m 3.4 m 115.60 m2
Trasram 75.58 m2
681.55 m2
II. Pasangan Bata Trasram 1 Pc : 3 Ps
Pasangan Bata Trasram 1 Pc : 3 Ps 4 19.45 m 1.00 m 77.8 m2
Pengurang 8 0.6 0.40 1.92
Kolom Praktis 2 bh 0.15 m 1 m 0.30 m2
75.58 m2
III. Plesteran Biasa 1:5 t= 1,5 cm
Plesteran Biasa 1:5 t= 1,5 cm 1363.105 m2
V. Acian
Acian 1514.265 m2
PERHITUNGAN VOLUME PEKERJAAN (BOQ)
2 LANTAI 2
I. Ps. Granit Tile 40x40 cm Polos
Ruang Ketua DPRD 48.00 m2
Ruang Wakil Ketua DPRD ; Sekertaris 68.00 m2
Ruang Komisi 1 ; Ruang Sidang komisi 1 102.00 m2
Ruang Komisi 2 ; Ruang Sidang Komisi 2 102.00 m2
Ruang Komisi 3 ; Ruang Sidang Komisi 3 102.00 m2
Ruang Komisi 4 ; Ruang Sidang Komisi 4 116.00 m2
Ruang Komisi 5 ; Ruang Sidang Komisi 5 102.00 m2
Ruang Tunggu 30.00 m2
Tangga 42.50 m2
657.00 m2
II. Ps. Granit Tile 40x40 cm motif
Koridor 359.00 m2
3 LANTAI 3
I. Ps. Granit Tile 40x40 cm polos
Ruang Sidang Paripurna 378.25 m2
Aula 208.25 m2
Musholla 82.00 m2
Gudang ; Dapur 44.00 m2
Tangga 42.50 m2
643.00 m2
II. Ps. Granit Tile 40x40 cm motif
Cafetaria & Restaurant 51.00 m2
Koridor 322.00 m2
373.00 m2
526.50
1150
588.00
1120
761.00
373
PERHITUNGAN VOLUME PEKERJAAN (BOQ)
MPANG
VOLUME Ket.
Tinggi
969.6 kg
1032.0 kg
7434.4 kg
4604.5 kg
14040.63 kg
4358.46 kg
0.40 m 48.00 m
HARGA SATUAN
URAIAN KEGIATAN SATUAN
(Rp)
Abu Batu M3 162,000.00
Agregat Kasar M3 250,000.00
Air Kerja Liter 27.00
Aluminium Coklat Uk. 3 x 7.5, Profil 3 inchi M 73,000.00
Aluminium Putih Uk. 4 x 10, Profil 4 inchi M 108,000.00
Angker Besi PJU Kg 12,794.00
Armature Lampu HPS 150 W Unit 1,734,900.00
Armature Lampu HPS 250 W Unit 1,844,000.00
Armature Lampu HPS 450 W Unit 2,715,240.00
Asbes Datar/Eternit Uk.100 x 100 x 0.4 mm Lembar 22,000.00
Asbes Gelombang Besar, Uk. 200 x 110 x 0.5 cm Lembar 90,000.00
Asbes Gelombang Kecil, Uk. 150 x 105 x 0.4 cm Lembar 48,000.00
Asbes Gelombang Kecil, Uk. 180 x 105 x 0.4 cm Lembar 60,000.00
Asbes Gelombang Kecil, Uk. 210 x 105 x 0.4 cm Lembar 67,000.00
Asbes Gelombang Super, Uk.150 x 105 x 0.5 cm Lembar 100,000.00
Asbes Gelombang Super, Uk.180 x 108 x 0.5 cm Lembar 110,000.00
Asbes Gelombang Super, Uk.210 x 108 x 0.5 cm Lembar 81,300.00
Aspal Curah Kg 10,900.00
Aspal panas AC 60/70 (termasuk angkutan) Kg 12,900.00
Asphalt Mixing Plant Jam 4,025,400.00
Bambu Bongkotan Dia. 10 - 12 Cm, P 3.00 mtr Batang 22,000.00
Bambu Bongkotan Dia. 10 - 12 Cm, P 3.00 mtr Batang 22,000.00
Bambu Ori Dia. 10 - 12 Cm, P 3.00 mtr Batang 36,000.00
Bata Berongga Expose Buah 4,100.00
Batu Ampyang M2 68,900.00
Batu Bata Merah Kelas 1 (Uk. 22x11x4.5 cm) Buah 800.00
Batu Bobos Uk 10 x 20 x 1.5 cm M2 190,000.00
Batu Kali Belah 15/20 cm M3 428,000.00
Batu Klingker M2 36,000.00
Batu Krikil Beton M3 238,500.00
Batu Pecah Mesin 1/2 cm M3 466,000.00
Batu Pecah Mesin 5/7 cm M3 216,000.00
Batu Pecah Mesin 0.5/1 cm m3 466,000.00
Batu Pecah Mesin 2/3 cm m3 243,300.00
BBM Subsidi Diesel Liter 7,500.00
BBM Subsidi Diesel Liter 7,500.00
Besi Angkur Dia. 16 mm panjang 70 cm Buah 35,000.00
Besi Angkur Dia. 16 mm panjang 70 cm M2 35,000.00
Besi Hollow 20/40 lonjor 72,500.00
Besi Hollow 40/40 lonjor 100,000.00
Besi Pipa Galvanish Medium 1 1/4 inchi M 292,900.00
Besi Pipa Galvanish Medium 1 inchi M 58,900.00
Besi Pipa Galvanish Medium 1/2 inchi M 33,600.00
Besi Pipa Galvanish Medium 2 1/2 inchi M 187,000.00
Besi Pipa Galvanish Medium 2 inchi M 187,000.00
Besi Pipa Galvanish Medium 5 inchi M 97,600.00
Besi Pipa Galvanish Medium 6 inchi M 173,900.00
Besi Pipa Galvanish Medium 8 inchi M 55,100.00
Besi Pipa Putih (Stainless) SCH 40 Welded uk. 1 inch Buah 140,000.00
Besi Pipa Putih (Stainless) SCH 40 Welded uk. 2 inch Buah 107,500.00
Besi Polos/Ulir Kg 13,500.00
Besi Profil WF >= 200 mm Kg 21,000.00
Besi Siku L.20.20.2 Kg 9,400.00
Besi Siku L.30.30.3 Kg 9,400.00
Beugel + Mur Baut ornamen Buah 120,000.00
Beugel + Mur Baut ornamen Buah 120,000.00
Biaya Menggilas dengan Mesin Gilas (walles) (1 hari = 5 jam) Jam 152,257.14
Blank Flanged 100 Buah 99,000.00
Buis Beton Bulat Ukuran 100 x 50 cm Buah 320,000.00
Cat Besi Kg 63,000.00
Cat Genteng 4 Kg Kg 196,000.00
Cat Kayu Kg 50,100.00
Cat Meni Kayu Kg 25,000.00
Cat Meni Besi Kg 36,300.00
Cat Road Line Kaleng 54,000.00
Cat Tembok Luar Kaleng 218,000.00
Cat Tembok Dalam Kaleng 121,000.00
Clear Gloss Kg 63,000.00
Closet Duduk Porselin (Komplit) Warna Putih Buah 3,395,600.00
Closet Jongkok Porselin Warna Putih Buah 464,200.00
Coumpond Per Kaleng 33,800.00
Cover 1000x1000x2400 (K 350, Besi 160 Kg) (Fabrikasi) Per Kaleng 2,719,200.00
Curbing Beton Type A panjang 60 cm Buah 60,000.00
Daun Pintu PVC Buah 275,000.00
Dempul Tembok Kg 33,000.00
Dolken kayu gelam dia 8-10 cm, panjang 4m Batang 30,300.00
Elbow 45o AW Dim. 2 inchi Buah 29,000.00
Electrode Baja Kg 58,100.00
Electrode Las Kg 38,000.00
Engsel H Pasang 10,900.00
Engsel Jendela Pasang 20,000.00
Engsel Pintu Pasang 66,000.00
Eternit Lembar 62,000.00
FBBT 100 Buah 446,600.00
Fiber Glas M2 40,700.00
Filler Liter 1,800.00
Fiting Plafon Buah 15,500.00
Fitrase M2 358,500.00
Galian Tanah Cadas/Rabat m3 155,700.00
Gedeg Guling M2 50,000.00
Genteng Flam Pres Jawa Buah 3,000.00
Genteng Galvalume Lembar 60,000.00
Genteng Kaca Buah 11,000.00
Genteng Karang Pilang / Wisma Buah 20,000.00
Genteng Wuwung Galvalume Buah 86,000.00
Genteng Wuwung Jawa Buah 12,000.00
Genteng Wuwung Karang Pilang / Wisma Buah 13,000.00
Glangsing 25 kg (isi 150 kg sedimen) Lembar 2,150.00
Gorden Ekslusif M2 57,475.00
Got Talang R.25 (1/2 lingkaran) Buah 35,000.00
Got Talang R.25 (segmen) Buah 34,000.00
Got Talang R.10 (1/2 lingkaran) Buah 28,000.00
Got Talang R.10 (segmen) Buah 26,000.00
Got Talang R.15 (1/2 lingkaran) Buah 32,000.00
Got Talang R.15 (segmen) Buah 27,000.00
Grass Block 54cmx36cmx10cm M2 87,000.00
Grendel besar Buah 22,000.00
Grendel Biasa (Kecil) Buah 10,000.00
Grendel Espanyolet Buah 87,100.00
Grendel Tanam Buah 112,000.00
Grounding Roud (Arde) 16 mm Buah 339,150.00
Gymfloor M2 310,000.00
Gypsum Board Lembar 70,500.00
Hak Angin Kuningan Lurus Maju/Mundur Pasang 15,500.00
Hak Angin Sikutan Biasa Pasang 15,000.00
Isolator Unit 7,800.00
Kabel 10 mm m 9,750.00
Kabel Glen / Water Mur PG-19 Buah 4,325.00
Kabel Glen / Water Mur PG-7 Buah 1,325.00
Kabel NFAX 2X (Twisted) 2 x 16 mm m 13,300.00
Kabel NFAX 2X (Twisted) 4 x 16 mm m 22,500.00
Kabel NYM 3 x 2,5 mm m 12,300.00
Kaca Gravier m2 1,590,000.00
Kaca Polos 5 mm M2 87,000.00
Kaca Ryband 5 mm M2 136,700.00
Kaca Stainglass m2 2,650,000.00
Kapur Pasang M3 92,900.00
Karpet Wold Cels M2 323,700.00
Kawat Bendrat Kg 25,900.00
Kawat Duri Roll 94,000.00
Kawat Harmonika lebar 90 cm M2 24,000.00
Kawat Ikat Kg 23,000.00
Kawat Nyamuk Kasa Aluminium M2 35,000.00
Kawat Nyamuk Kasa Plastik, Lebar 90 cm M2 12,000.00
Kayu Jati Balok 5/7, 6/15, 6/12, 8/12 M3 18,417,200.00
Kayu Jati Papan 2/20, 4/10 M3 18,417,200.00
Kayu Kamper Balok 3/5, 4/6, 5/7 M3 6,400,000.00
Kayu Kamper Balok 6/12, 6/15, 8/12 M3 6,895,000.00
Kayu Kamper Balok 8/12 M3 9,000,000.00
Kayu Meranti Balok 6/15, 6/12, 8/12 M3 4,100,000.00
Kayu Meranti Bekisting M3 3,622,500.00
Kayu Meranti Papan 2/20, 4/10 M3 4,347,000.00
Kayu Meranti Reng 2/3, 3/4 M3 3,000,000.00
Kayu Meranti Usuk 4/6, 5/7 M3 3,900,000.00
Kemasan Plastik Buah 3,800.00
Keni Pipa PVC ½ inchi (Putih) Buah 3,700.00
Keramik (Dinding) Uk. 20 x 25 Cm M2 60,000.00
Keramik (Plint) Uk. 7,5 x 20 Cm Buah 61,000.00
Keramik Lantai Bermotif Uk. 20x20 cm M2 91,000.00
Keramik Lantai Bermotif Uk. 30x30 cm M2 130,000.00
Keramik Lantai Bermotif Uk. 40x40 cm M2 145,000.00
Keramik Lantai Granito Oasis Crystal White Sand Uk. 40x40 cm M2 247,500.00
Keramik Lantai Granito Salsa Pearl White Uk. 40x40 cm M2 206,800.00
Keramik Lantai Granito Unpolished Uk. 60x60 cm M2 211,200.00
Keramik Lantai Marmer M2 608,000.00
Keramik Lantai Putih Uk. 40 x 40 Cm M2 79,000.00
Keramik Lantai Putih Uk. 30 x 30 Cm M2 70,000.00
Keramik Lantai(porcelain) Uk. 30x30 M2 120,000.00
Kertas Gosok Halus no. 150 Lembar 20,400.00
Kertas Gosok Kasar Lembar 20,000.00
Klem PVC Buah 3,000.00
Konektor Kabel PJU Buah 15,725.00
Kran Air Dia. 3/4 Buah 38,900.00
Krepyak Nako Buah 14,100.00
Kuas 4 inchi Buah 12,000.00
Kunci Tanam Buah 81,000.00
Kunci Tanam Besar (Kuningan) Buah 96,000.00
L PVC 100 x 45 Buah 283,000.00
L PVC 100 x 90 Buah 283,000.00
Lampu Jalan Raya LED Unit 8,568,000.00
Lampu Pedestrian LED Unit 7,340,000.00
Lampu Taman Unit 214,000.00
Lapis Perekat/Tack Coat Liter 16,137.90
Lem Kayu 1/2 Kg Kg 12,000.00
Lem PVC Buah 14,300.00
Lem Wall Paper kg 56,000.00
Logo Pemkot untuk PJU Buah 75,000.00
MCB C120N 100 A 3 Phase Buah 1,757,800.00
MCB C60N 10 A 1 Phase Buah 159,000.00
MCB C60N 16 A 1 Phase Buah 159,000.00
MCB C60N 25 A 1 Phase Buah 159,000.00
MCB C60N 25 A 3 Phase Buah 535,500.00
MCB C60N 40 A 1 Phase Buah 159,000.00
MCB C60N 40 A 3 Phase Buah 582,900.00
MCB C60N 50 A 1 Phase Buah 233,200.00
MCB C60N 6 A 1 Phase Buah 159,000.00
MCB C60N 63 A 1 Phase Buah 268,800.00
Minyak Bekisting Liter 30,100.00
Minyak Pelumas Liter 28,300.00
Minyak Tanah Liter 8,700.00
Multiplek 9 mm Lembar 105,000.00
Mur + Ring untuk Angker Buah 3,420.00
Pabrikasi/Elektroda Baja (20%) M2 35,000.00
Pagar BRC Dia. 6 mm, panjang 240 cm, tinggi 120 cm Unit 348,200.00
Paku Asbes Sekrup 4 inchi Buah 8,100.00
Paku Biasa 2 - 5 inchi Doz 20,640.00
Paku Klem (No 4) / Beton Doz 19,000.00
Paku Klem (No 4) / Beton Doz 19,000.00
Paku Reng Kg 15,000.00
Paku Seng Payung Kg 23,300.00
Paku Triplek/Eternit/Usuk Kg 14,800.00
Panel Kwh meter 1 phase Buah 1,121,600.00
Panel Kwh meter 3 phase Buah 1,064,000.00
Panel PJU Buah 1,121,600.00
Papan Semen 1200x2400x35mm Lembar 63,000.00
Pasir Alam M3 248,400.00
Pasir Cor/Beton M3 265,300.00
Pasir Pasang/Plester M3 142,300.00
Pasir Urug M3 176,000.00
Pekerjaan Bekisting Lantai m2 378,800.00
Pekerjaan Beton ( 1Pc : 2 Ps : 3 Kr) m3 1,153,439.15
Pekerjaan Pembesian dengan besi beton (polos/ulir) kg 14,498.00
Pekerjaan Pengelasan dengan las listrik cm 2,510.20
Pekerjaan Plat Tutup Beton (1 Pc : 2 Ps : 3 Kr) m3 3,057,799.15
Pemakaian Spesi Campuran Strous Pile (1 Pc : 1,5 Ps : 2,5 Kr) m3 981,908.00
Pemasangan dan Penarikan Kabel m 4,950.00
Pemasangan Panel Lampu PJU Unit 169,200.00
Pemasangan Pipa Galvanis Termasuk Elektrode m 10,301.10
Pengecatan Kayu (1 plamir, 1 lapis cat dasar, 3 lapis cat penutup) m2 61,155.00
Penggalian Tanah Keras m3 102,840.00
Perakitan Panel Penerangan Jalan Umum (PJU) Unit 162,000.00
Perakitan Panel Penerangan Jalan Umum (PJU) Unit 167,750.00
Pilot Lamp Buah 42,500.00
Pintu Pagar Besi Komplit dengan Aksesoris M2 790,000.00
Pintu Swing Ganda BRC/PMG Uk. 1.2x3.00 m2 Unit 493,300.00
Pipa Besi Galvanish Dim. 2 M 110,622.91
Pipa Besi Galvanish Dim. 4 M 261,942.80
Pipa Besi Galvanish Dim. 4 M 261,942.80
Pipa Besi Galvanish Med A, Dim. 3/4 M 45,600.00
Pipa Besi Galvanish Dim. 4 m 261,942.80
Pipa Cooker 150 M 184,400.00
Pipa Pe Warna Hitam 12 mm M 24,900.00
Pipa Plastik PVC Tipe AW Uk. 1 Pj. 4 mtr Batang 42,000.00
Pipa Plastik PVC Tipe AW Uk. 1/2 Pj. 4 mtr Batang 29,000.00
Pipa Plastik PVC Tipe AW Uk. 2 Pj. 4 mtr Batang 127,000.00
Pipa Plastik PVC Tipe AW Uk. 3 Pj. 4 mtr Batang 210,000.00
Pipa Plastik PVC Tipe AW Uk. 3/4 Pj. 4 mtr Batang 36,000.00
Pipa Plastik PVC Tipe AW Uk. 4 Pj. 4 mtr Batang 305,000.00
Pipa Plastik PVC Tipe AW Uk. 5 Pj. 4 mtr Batang 479,600.00
Pipa Plastik PVC Tipe C Uk. 1 ½ inchi Pj.4mtr Batang 27,700.00
Pipa Plastik PVC Tipe C Uk. 2 inchi Pj. 4mtr Batang 47,800.00
Pipa Plastik PVC Tipe C Uk. 3 inchi Pj.4mtr Batang 69,000.00
Pipa Plastik PVC Tipe C Uk. 4 inchi Pj.4mtr Batang 89,000.00
Pipa Plastik PVC Tipe C Uk. 5 inchi Pj.6mtr Batang 142,700.00
Pipa Plastik PVC Tipe C Uk. 6 inchi Pj.6mtr Batang 166,900.00
Pipa Pralon 5/8 Batang 7,400.00
Pipa PVC 110 M 26,200.00
Pipa PVC 160 M 90,200.00
Pipa PVC Pelaluan Arde Dim. ½ inchi (Putih) M 6,350.00
Plamir Besi Kg 32,100.00
Plamir Tembok Kg 36,500.00
Plat Besi/Baja Kg 28,000.00
Plat Strip uk 3 x 40 mm M 40,000.00
Produksi ATB / ATBL / Lapis Beton untuk LPA (Laston Atas) Ton 1,043,328.00
Produksi Dan Penghamparan Laston Lapis Antara Leveling / AC Ton
- BC Leveling 1,061,586.77
Produksi Lapis tipis aspal beton AC (lataston) menggunakan alat Ton 1,212,012.00
Rangka Galvalume Campuran M2 264,900.00
Rangka Galvalume Uk 0.5mm M2 245,000.00
Rangka Galvalume Uk 0.8mm M2 312,000.00
Rangka Metal Stud M3 4,496,500.00
Renolith Kg 41,500.00
Rol TBA Roll 11,800.00
Roll Pipa 2 Unit 42,999.80
Saklar Ganda Unit 49,400.00
Saklar Tunggal Unit 32,400.00
Sapu Ijuk Buah 27,500.00
Sealant Tube 60,300.00
Semen Berwarna Yiyitan Kg 16,000.00
Semen PC 50 Kg Zak 60,000.00
Semen PC 40 Kg Zak 53,000.00
Seng Datar BJLS 40 Lembar 55,000.00
Seng Gelombang BJLS 30, Uk. (0,8 x 1,50) M1 63,000.00
Seng Talang BJLS 40 Lbr 90 M1 33,200.00
Serat Fiber Lembar 10,100.00
Service Kabel Buah 31,200.00
Shanding Kg 70,000.00
Sirtu M3 205,000.00
Slimar Aluminium 3/8 M 90,000.00
Stenless Tie + Clip (Yuke) + Ring Buah 11,900.00
Stiker Reflektive 10 x 100 cm cm 12,000.00
Stopkontak Buah 27,300.00
Stopper/Uskup Tb 6 cm abu-abu Buah 4,800.00
Stopper/Uskup Tb 6 cm warna Buah 5,500.00
Stopper/Uskup Tb 8 cm abu-abu Buah 6,000.00
Stopper/Uskup Tb 8cm warna Buah 7,000.00
T Doos Pvc Buah 3,900.00
Tabung Acitlyn (Karbit) Buah 316,500.00
Tabung Oksigen Besar Buah 359,800.00
Tack Coat Liter 14,100.00
Tanah Katel M3 116,100.00
Tanah Taman m3 116,100.00
Teakwood Uk. 122 x 244 x 4 mm Lembar 83,700.00
Tee 100 x 100 Buah 430,000.00
Tee 150 x 100 Buah 749,000.00
Tee 150 x 150 Buah 765,000.00
Teer Kg 7,400.00
Thinner A Liter 30,000.00
Thinner A Special Liter 37,500.00
Tiang Biasa 5 m tanam Unit 2,500,000.00
Tiang Cabang Biasa 1-7 m Batang 1,443,300.00
Tiang Cabang Biasa 2-5 m Unit 1,433,300.00
Tiang Cabang Biasa 2-7 m Batang 1,554,000.00
Tiang Oktagonal 5 m Single Hot Dipped Galvanized dengan Batang
Flenders 2,405,400.00
Time Switch Sul 181 d Unit 487,500.00
Triplek Uk.110 x 210 x 4 mm Lembar 64,000.00
U Gutter U1000/1000-2400 (K 350 ; Besi 130 Kg) (Fabrikasi) Buah 2,719,200.00
Valve 100 Buah 1,085,100.00
Valve 150 Buah 2,277,100.00
Vertical Blind M2 224,000.00
Wall Paper M2 300,000.00
Wastafel Buah 464,000.00
Waterproof Kg 85,000.00
Wiremesh M2 78,000.00
Wood Filler Kg 38,000.00
Pipa Plastik PVC Tipe AW Uk. 1 1/2 Pj. 4 mtr Batang 82,500.00
Tiang Pancang Batang 142,900.00
Semen Putih Zak 83,000.00
List Gypsum m1 17,500.00
Pipa Plastik PVC Tipe C Uk. 6 inchi Pj.6mtr Batang 237,120.00
Kran Air dia. 3/4" Leher Angsa Buah 50,160.00
Kitchen zinck Buah 125,000.00
Avoor/Floordrain Buah 68,750.00
Atap Metal Zincalume Lembar 46,400.00
Peredam Panas (aluminium foil) M2 24,000.00
Bubungan Atap Metal Zincalume Buah 10,000.00
Clasilank 1/30 m1 27,500.00
Galvalum Canal C t. 0,75 mm Ljr 32,500.00
Reng Galvalum t. 0,75 mm Buah 18,500.00
Sunscreen Aluminium m2 350,000.00
Lampu philiphs 10 watt Buah 35,000.00
Lampu philiphs downlight LED outbow 12 watt Buah 59,900.00
Lampu philiphs downlight LED outbow 18 watt Buah 72,900.00
Lampu philiphs downlight LED inbow 24 watt Buah 260,000.00
Sunscreen Aluminium m2 350,000.00
MCB Buah 159,000.00
Pupuk kandang krg 20,000.00
Rumput Gajah m2 30,000.00
Pohon tinggi 2 meter Buah 550,000.00
Pohon perdu Buah 55,000.00
Panel Beton Pracetak Lembar 125,000.00
Kolom Beton Pracetak Batang 270,000.00
Daun Pintu Double Triplek Unit 276,250.00
Smoke Detector Unit 325,000.00
HARGA SATUAN
URAIAN KEGIATAN SATUAN
(Rp)
Kepala Tukang Orang Hari 93,500.00
Mandor Orang Hari 97,900.00
Operator Alat Konstruksi (Excavator) Orang Hari 88,000.00
Pembantu Operator Orang Hari 82,500.00
Pembantu Supir Orang Hari 67,000.00
Pembantu Tukang Orang Hari 67,000.00
Sopir Orang Hari 88,000.00
Buruh Tak Terampil Orang Hari 67,000.00
Tenaga Pemasak Aspal Orang Hari 99,000.00
Tenaga Surveyor Orang Hari 80,000.00
Pekerja Orang Hari 74,800.00
HARGA SATUAN
URAIAN KEGIATAN SATUAN
(Rp)
Sewa Alat Bantu 1set @ 3 alat M3 1,100.00
Sewa Alat Bantu Pembuatan Aspal Emulsi Jam 20,400.00
Sewa Alat Bantu Pembuatan Laston Renolith Jam 12,800.00
Sewa Alat Bantu Penerangan Jalan Umum (PJU) Jam 6,700.00
Sewa Alat Bantu Strouss Pile Jam 10,200.00
Sewa Alat Las Hari 15,300.00
Sewa Amp 10 T Min 5 jam Jam 263,900.00
Sewa Ashpalt Finisher Min 3 jam Jam 1,062,300.00
Sewa Aspal Sprayer Min 4 Jam Jam 28,000.00
Sewa Bucket dan Crane / Draglin Scraper Jam 81,400.00
Sewa Compresor Min. 5 Jam Jam 95,100.00
Sewa Compresor 250 CFM (Min 5 jam) Jam 35,600.00
Sewa Concrete Mixer 0.50 m3 (Min 3 jam) Jam 66,100.00
Sewa Concrete Pump Min 3 Jam Jam 66,100.00
Sewa Concrete Vibrator Jam 15,300.00
Sewa Crane 30 ton - Min. 8 Jam (Termasuk Mob/Demob Jam 139,800.00
Operator
Sewa DumpBBM)
Truk 5 Ton Jam 70,000.00
Sewa Escavator 6m3 Jam 132,200.00
Sewa Generator 5000 Watt Unit 700,000.00
Sewa Motor Grader 125 - 140 pk Min 5 jam Jam 279,600.00
Sewa Pan Mixer Jam 20,400.00
Sewa Pneumatic Tire Roller Min 5 jam Jam 223,700.00
Sewa Stemper Jam 113,700.00
Sewa Tandem Roller Jam 268,400.00
Sewa Theodolite Hari 352,300.00
Sewa Truk Kelas 3 Dalam Kota Hari 778,500.00
Sewa Truk Tangki Air min 5 jam Hari 503,200.00
Sewa Vibrator Roller Min 5 jam Jam 137,300.00
Sewa Walles Min 5 Jam Jam 107,400.00
Sewa Welding Set (min 5 jam) Hari 30,500.00
Sewa Wheel Loader 1.7 - 2 m3 (min 5 jam) Jam 581,500.00
Sewa Hammer Tiang Pancang min. 8 jam Jam 188,100.00
PERHITUNGAN VOLUME PEKERJAAN (BOQ)
m'
m2
Ls
m'
Ls
PERHITUNGAN VOLUME PEKERJAAN (BOQ)
berat
64.998
43.056
108.054 kg
86.4432 kg/m3
BANYAK UTAMA (KG) n PANJANG
K1 4 20 132 0.022 2.23 23548.80 21 2.08 10
K2 4 16 81 0.022 2.23 11560.32 21 1.68 10
K3 4 12 0 0.019 2.23 0.00 21 1.48 10
K4 4 8 0 0.019 2.23 0.00 21 1.08 10
K5 4 4 0 0.019 2.23 0.00 21 0.88 10
P1 2 10 80 0.019 2.23 4923.84 11 2.08 10
P2 2 8 2 0.019 2.23 98.48 11 1.08 10
SENGKANG (KG) kg
0.62 3574.77 27123.57 694.1946 RERATA
0.62 1771.76 13332.08 341.2183 517.7064
0.62 0.00 0.00 0
0.62 0.00 0.00 0
0.62 0.00 0.00
0.62 1134.85 6058.69 263.486 kg
0.62 14.73 113.21
Tulangan utama 1 batang balok anak
jenis panjang panjang lap panjang tump jumlah lap jumlah tump total panjang
BA1 3 1.5 1.5 4 2 9
BA2 4 2 2 4 2 12
BA3 4 2 2 4 2 12
BA4 5 2.5 2.5 5 3 20
Ring Balk
Tulangan Sengkang
diameter berat Total berat diameter berat jarak banyak panjang total berat
16 1.578 14.202 kg 8 0.395 100 31 0.84 10.2858
16 1.578 18.936 kg 8 0.395 100 41 0.94 15.2233
16 1.578 18.936 kg 8 0.395 100 41 0.94 15.2233
16 1.578 31.56 kg 8 0.395 100 51 0.94 18.9363
KG/M3 RERATA
136.0433 137.9591
140.9749
121.9975
180.3439
136.0433
121.9975
121.9975
144.2751
total berat
kg
kg
kg
kg
Tulangan utama 1 batang balok induk
jenis panjang panjang lap panjang tump jumlah lap jumlah tump total panjang
B1 6 3 3 7 4 33
B2 4.25 2.125 2.125 6 3 19.125
B3 3 1.5 1.5 4 2 9
B4 4 2 2 5 3 16
B5 5 2.5 2.5 5 3 20
RERATA
89.21695 499.6965
109.5573
92.42563 RERATA BA BI
112.4585 318.8278
96.12292
89.21695
109.5573
92.42563
4183.455
22.52881
total berat
kg
kg
kg
kg
kg
pelat lantai 2 25 140.8175 3520.438 kg
panj tump lap jarak n total panj diameter
x lebar 4.25 2.125 2.125 0.2 42 178.5 8 0.395 70.5075
y panj 4 2 2 0.2 44.5 178 8 0.395 70.31
140.8175
TANGGA RERATA
806.048 96.28478
PERHITUNGAN VOLUME PEKERJAAN (BOQ)
V. Balok B2 30x50
Balok B2 30x50 238 m 0.3 m 0.50 m 35.70 m3
X. Balok BA 2 20x35
Balok BA 2 20x35 180 m 0.2 m 0.4 m 12.60 m3
XI. Balok BA 3 20x35
Balok BA 3 20x35 20 m 0.2 m 0.4 m 1.40 m3
V. Balok B2 30x50
Balok B2 30x50 238 m 0.3 m 0.50 m 35.70 m3
X. Balok BA 2 20x35
Balok BA 2 20x35 192.00 m 0.20 m 0.35 m 13.44 m3
XI. Balok BA 3 20x35
Balok BA 3 20x35 20.00 m 0.20 m 0.35 m 1.40 m3
PENAMPANG
VOLUME Ket.
Lebar Tinggi
1099.28 m2
m 115.2 m2