REKAPITULASI RENCANA ANGGARAN BIAYA

NO URAIAN PEKERJAAN JUMLAH HARGA BOBOT


1 PEKERJAAN PERSIAPAN Rp 69,441,177.40 0.56%
2 PEKERJAAN TANAH Rp 172,207,735.03 1.39%
3 PEKERJAAN PONDASI Rp 1,473,503,046.63 11.92%
4 PEKERJAAN STRUKTUR
LANTAI 1 Rp 1,287,107,765.79 10.41%
LANTAI 2 Rp 2,068,657,867.00 16.74%
LANTAI 3 Rp 1,744,467,930.03 14.11%
LANTAI ATAP Rp 1,498,064,033.73 12.12%
5 PEKERJAAN ARSITEKTURAL
LANTAI 1 Rp 1,300,888,343.88 10.52%
LANTAI 2 Rp 1,210,852,757.17 9.80%
LANTAI 3 Rp 1,169,959,913.22 9.47%
6 PEKERJAAN MEP
LANTAI 1 Rp 124,206,475.65 1.00%
LANTAI 2 Rp 123,713,050.17 1.00%
LANTAI 3 Rp 117,252,150.41 0.95%
JUMLAH HARGA PEKERJAAN Rp 12,360,322,246 100%
PPN Rp 1,236,032,225
TOTAL BIAYA Rp 13,596,354,471
PEMBULATAN Rp 13,596,354,471
HARGA PER M2 Rp 3,568,597 3810
REKAPITULASI RENCANA ANGGARAN BIAYA
PEKERJAAN :
PEMBANGUNAN GEDUNG KANTOR DPRD KOTA SURAKARTA

NO URAIAN PEKERJAAN JUMLAH HARGA


1 PEKERJAAN PERSIAPAN Rp 69,441,177.40
2 PEKERJAAN TANAH Rp 172,207,735.03
3 PEKERJAAN PONDASI Rp 1,473,503,046.63
4 PEKERJAAN STRUKTUR
LANTAI 1 Rp 1,287,107,765.79
LANTAI 2 Rp 2,068,657,867.00
LANTAI 3 Rp 1,744,467,930.03
LANTAI ATAP Rp 1,498,064,033.73
5 PEKERJAAN ARSITEKTURAL
LANTAI 1 Rp 1,300,888,343.88
LANTAI 2 Rp 1,210,852,757.17
LANTAI 3 Rp 1,169,959,913.22
6 PEKERJAAN MEP
LANTAI 1 Rp 124,206,475.65
LANTAI 2 Rp 123,713,050.17
LANTAI 3 Rp 117,252,150.41
JUMLAH HARGA PEKERJAAN Rp 12,360,322,246
PEMBULATAN Rp 12,360,322,000
HARGA PER M2 Rp 3,646,113
133,612,499.50
181,025,452.29
1,243,219,421.65

691,241,774.09
2,122,609,363.91
1,756,917,707.01
1,408,482,108.34

1,325,392,643.94
1,367,153,310.58
1,202,340,403.55

86,870,989.12
88,509,942.81
75,948,414.81
11,683,324.03

11,683,324,031.60

1168332403.16
12851656434.76
12,851,656,434.76

3824897.74844048
3477179.77130952
ANALISA SATUAN PEKERJAAN (MENGGUNAKAN HSPK SURAKARTA TAHUN 2019)

HARGA
NO URAIAN PEKERJAAN VOL. SAT. JUMLAH (Rp.)
SATUAN
[1] [2] [3] [4] [5] [6] (= 3 x 5)
A. PEKERJAAN PERSIAPAN RSNI T-12-2002
1 Pengukuran dan Pemasangan Bowplank (Uitzet) m1
Bahan
Kayu Meranti Papan 2/20, 4/10 0.0070 m3 4,347,000.00 30,429.00
Kayu Meranti Usuk 4/6, 5/7 0.0120 m3 3,900,000.00 46,800.00
Paku Biasa 2 - 5 inchi 0.0200 Kg 20,640.00 412.80

Upah
Mandor 0.0045 O.H 97,900.00 440.55
Kepala Tukang 0.0100 O.H 93,500.00 935.00
Tukang 0.1000 O.H 74,800.00 7,480.00
Buruh Tak Terampil 0.1000 O.H 67,000.00 6,700.00
TOTAL 93,197.35

B. PEKERJAAN TANAH SNI 2835 : 2008


1 Pek. Galian Tanah Biasa m3
Upah
Mandor 0.0250 O.H 97,900.00 2,447.50
Buruh Tak Terampil 0.7500 O.H 67,000.00 50,250.00
TOTAL 52,697.50

2 Pek. Urug Pasir (Padat) m3


Bahan
Pasir Urug 1.2000 m3 176,000.00 211,200.00
Upah
Mandor 0.0100 O.H 97,900.00 979.00
Buruh Tak Terampil 0.3000 O.H 67,000.00 20,100.00
TOTAL 232,279.00

3 Urugan Sirtu Padat m3


Bahan
Sirtu 1.2000 m3 205,000.00 246,000.00
Sewa Stemper 0.0088 Jam 113,700.00 1,000.56
Upah
Mandor 0.0250 O.H 97,900.00 2,447.50
Buruh Tak Terampil 0.2500 O.H 67,000.00 16,750.00
TOTAL 266,198.06

4 Urug Tanah Kembali dan Pemadatan m3


Bahan
Sewa Alat Bantu 1set @ 3 alat 8.0000 m3 1,100.00 8,800.00
Upah
Mandor 0.0500 O.H 97,900.00 4,895.00
Buruh Tak Terampil 0.5000 O.H 67,000.00 33,500.00
TOTAL 47,195.00

5 Pengangkutan Tanah Keluar Proyek m3


Upah
Buruh Tak Terampil 0.2500 O.H 67,000.00 16,750.00

Sewa Alat
Sewa Dump Truk 5 Ton 0.2500 Jam 70,000.00 17,500.00
TOTAL 34,250.00

6 Pek. Pembersihan Lapangan dan Perataan Tanah m2


Upah
Mandor 0.0500 O.H 97,900.00 4,895.00
Buruh Tak Terampil 0.1000 O.H 67,000.00 6,700.00
TOTAL 11,595.00

C. PEKERJAAN PONDASI SNI 2836 : 2008


1 Pondasi Batu Kali Belah 15/20 cm ( 1 Pc : 4 Psr ) m3
Bahan
Semen PC 50 Kg 3.2600 Zak 60,000.00 195,600.00
Pasir Pasang/Plester 0.5200 m3 142,300.00 73,996.00
Batu Kali Belah 15/20 cm 1.2000 m3 428,000.00 513,600.00

1
Upah
Mandor 0.0750 O.H 97,900.00 7,342.50
Kepala Tukang 0.0750 O.H 93,500.00 7,012.50
Tukang 0.7500 O.H 74,800.00 56,100.00
Buruh Tak Terampil 1.5000 O.H 67,000.00 100,500.00
TOTAL 954,151.00

2 Pondasi Batu Kali Belah 15/20 cm ( 1 Pc : 5 Psr ) m3


Bahan
Semen PC 50 Kg 2.7200 Zak 60,000.00 163,200.00
Pasir Pasang/Plester 0.5440 m3 142,300.00 77,411.20
Batu Kali Belah 15/20 cm 1.2000 m3 428,000.00 513,600.00

Upah
Mandor 0.0750 O.H 97,900.00 7,342.50
Kepala Tukang 0.0750 O.H 93,500.00 7,012.50
Tukang 0.7500 O.H 74,800.00 56,100.00
Buruh Tak Terampil 1.5000 O.H 67,000.00 100,500.00
TOTAL 925,166.20

3 Anstampeng / Batu Kosong m3


Bahan
Batu Kali Belah 15/20 cm 1.2 m3 428,000.00 513,600.00
Pasir Urug 0.432 m3 176,000.00 76,032.00

Upah
Mandor 0.039 O.H 97,900.00 3,818.10
Kepala Tukang 0.039 O.H 93,500.00 3,646.50
Tukang 0.39 O.H 74,800.00 29,172.00
Buruh Tak Terampil 0.7800 O.H 67,000.00 52,260.00
TOTAL 678,528.60

D. PEKERJAAN PASANGAN SNI 6897:2008


1 Pasangan Dinding Batu Bata 1/2 Bata ( 1 Pc : 3 Psr ) m2
Bahan
Semen PC 50 Kg 0.2874 Zak 60,000.00 17,244.00
Pasir Pasang/Plester 0.0400 m3 142,300.00 5,692.00
Batu Bata Merah Kelas 1 (Uk. 22x11x4.5 cm) 70.0000 Bh 800.00 56,000.00

Upah
Kepala Tukang 0.0100 O.H 93,500.00 935.00
Tukang 0.1000 O.H 74,800.00 7,480.00
Buruh Tak Terampil 0.3000 O.H 67,000.00 20,100.00
TOTAL 107,451.00

2 Pasangan Dinding Batu Bata 1/2 Bata ( 1 Pc : 4 Psr ) m2


Bahan
Semen PC 50 Kg 0.2300 Zak 60,000.00 13,800.00
Pasir Pasang/Plester 0.0430 m3 142,300.00 6,118.90
Batu Bata Merah Kelas 1 (Uk. 22x11x4.5 cm) 70.0000 Bh 800.00 56,000.00

Upah
Mandor 0.0150 O.H 97,900.00 1,468.50
Kepala Tukang 0.0100 O.H 93,500.00 935.00
Tukang 0.1000 O.H 74,800.00 7,480.00
Buruh Tak Terampil 0.3000 O.H 67,000.00 20,100.00
TOTAL 105,902.40

3 Pasangan Dinding Batu Bata 1/2 Bata ( 1 Pc : 5 Psr ) m2


Bahan
Semen PC 50 Kg 0.1936 Zak 60,000.00 11,616.00
Pasir Pasang/Plester 0.0450 m3 142,300.00 6,403.50
Batu Bata Merah Kelas 1 (Uk. 22x11x4.5 cm) 70.0000 Bh 800.00 56,000.00

Upah
Kepala Tukang 0.0100 O.H 93,500.00 935.00
Tukang 0.1000 O.H 74,800.00 7,480.00
Buruh Tak Terampil 0.3000 O.H 67,000.00 20,100.00
TOTAL 102,534.50

2
E. PEKERJAAN PLESTERAN SNI 2837 : 2008
1 Plester Halus t.1,5 cm ( 1 pc : 3 psr ) m2
Bahan
Semen PC 50 Kg 0.1555 Zak 60,000.00 9,331.20
Pasir Pasang/Plester 0.0230 m3 142,300.00 3,272.90

Upah
Kepala Tukang 0.0150 O.H 93,500.00 1,402.50
Tukang 0.1500 O.H 74,800.00 11,220.00
Buruh Tak Terampil 0.3000 O.H 67,000.00 20,100.00
TOTAL 45,326.60

2 Plester Halus t.1,5 cm ( 1 pc : 4 psr ) m2


Bahan
Semen PC 50 Kg 0.1248 Zak 60,000.00 7,488.00
Pasir Pasang/Plester 0.0240 m3 142,300.00 3,415.20

Upah
Mandor 0.0150 O.H 97,900.00 1,468.50
Kepala Tukang 0.0150 O.H 93,500.00 1,402.50
Tukang 0.1500 O.H 74,800.00 11,220.00
Buruh Tak Terampil 0.3000 O.H 67,000.00 20,100.00
TOTAL 45,094.20

3 Plester Halus t.1,5 cm ( 1 pc : 5 psr ) m2


Bahan
Semen PC 50 Kg 0.1037 Zak 60,000.00 6,220.80
Pasir Pasang/Plester 0.0260 m3 142,300.00 3,699.80

Upah
Kepala Tukang 0.0150 O.H 93,500.00 1,402.50
Tukang 0.1500 O.H 74,800.00 11,220.00
Buruh Tak Terampil 0.3000 O.H 67,000.00 20,100.00
TOTAL 42,643.10

4 Benangan (Skoning) m1
Bahan
Semen PC 50 Kg 0.0100 Zak 60,000.00 600.00
Pasir Pasang/Plester 0.0130 m3 142,300.00 1,849.90

Upah
Mandor 0.0040 O.H 97,900.00 391.60
Kepala Tukang 0.0400 O.H 93,500.00 3,740.00
Tukang 0.0400 O.H 74,800.00 2,992.00
Buruh Tak Terampil 0.0800 O.H 67,000.00 5,360.00
TOTAL 14,933.50

5 Acian m2
Bahan
Semen PC 50 Kg 0.0650 Zak 60,000.00 3,900.00

Upah
Kepala Tukang 0.0100 O.H 93,500.00 935.00
Tukang 0.1000 O.H 74,800.00 7,480.00
Buruh Tak Terampil 0.2000 O.H 67,000.00 13,400.00
TOTAL 25,715.00

F. PEKERJAAN BETON SNI 7394:2008


1 Lantai Kerja K-100 m3
Bahan
Semen PC 40 Kg 5.7500 Zak 53,000.00 304,750.00
Pasir Cor/Beton 0.5581 m3 265,300.00 148,070.56
Batu Pecah Mesin 2/3 cm 0.5405 m3 243,300.00 131,509.98

Upah
Kepala Tukang 0.0200 O.H 93,500.00 1,870.00
Pekerja 0.2000 O.H 74,800.00 14,960.00
Buruh Tak Terampil 1.2000 O.H 67,000.00 80,400.00
TOTAL 681,560.54

3
2 Pek. Beton. K. 175 m3
Bahan
Semen PC 40 Kg 8.1500 Zak 53,000.00 431,950.00
Pasir Cor/Beton 0.4806 m3 265,300.00 127,509.81
Batu Pecah Mesin 2/3 cm 0.5416 m3 243,300.00 131,766.16

Upah
Mandor 0.0830 O.H 97,900.00 8,125.70
Kepala Tukang 0.0280 O.H 93,500.00 2,618.00
Pekerja 0.2750 O.H 74,800.00 20,570.00
Buruh Tak Terampil 1.6500 O.H 67,000.00 110,550.00
TOTAL 833,089.67

3 Pek. Beton. K. 200 m3


Bahan
Semen PC 40 Kg 8.8000 Zak 53,000.00 466,400.00
Pasir Cor/Beton 0.4569 m3 265,300.00 121,208.94
Batu Pecah Mesin 2/3 cm 0.5426 m3 243,300.00 132,022.26

Upah
Mandor 0.0830 O.H 97,900.00 8,125.70
Kepala Tukang 0.0280 O.H 93,500.00 2,618.00
Pekerja 0.2750 O.H 74,800.00 20,570.00
Buruh Tak Terampil 1.6500 O.H 67,000.00 110,550.00
TOTAL 861,494.90

4 Pek. Beton. K. 225 m3


Bahan
Semen PC 40 Kg 9.2750 Zak 53,000.00 491,575.00
Pasir Cor/Beton 0.4363 m3 265,300.00 115,737.13
Batu Pecah Mesin 2/3 cm 0.5511 m3 243,300.00 134,071.11

Upah
Mandor 0.0830 O.H 97,900.00 8,125.70
Kepala Tukang 0.0280 O.H 93,500.00 2,618.00
Pekerja 0.2750 O.H 74,800.00 20,570.00
Buruh Tak Terampil 1.6500 O.H 67,000.00 110,550.00
TOTAL 883,246.93

5 Pek. Beton. K. 250 m3


Bahan
Semen PC 40 Kg 9.6000 Zak 53,000.00 508,800.00
Pasir Cor/Beton 0.4325 m3 265,300.00 114,742.25
Batu Pecah Mesin 2/3 cm 0.5468 m3 243,300.00 133,046.68

Upah
Mandor 0.0830 O.H 97,900.00 8,125.70
Kepala Tukang 0.0280 O.H 93,500.00 2,618.00
Pekerja 0.2750 O.H 74,800.00 20,570.00
Buruh Tak Terampil 1.6500 O.H 67,000.00 110,550.00
TOTAL 898,452.63
5 Pek. Beton. K. 300 m3
Bahan
Semen PC 40 Kg 10.3250 Zak 53,000.00 547,225.00
Pasir Cor/Beton 0.4256 m3 265,300.00 112,918.31
Batu Pecah Mesin 2/3 cm 0.5374 m3 243,300.00 130,741.74

Upah
Kepala Tukang 0.0280 O.H 93,500.00 2,618.00
Pekerja 0.2750 O.H 74,800.00 20,570.00
Buruh Tak Terampil 1.6500 O.H 67,000.00 110,550.00
TOTAL 924,623.05
6 Pek. Beton. K. 350 m3
Bahan
Semen PC 40 Kg 11.2000 Zak 53,000.00 593,600.00
Pasir Cor/Beton 0.4169 m3 265,300.00 110,596.94
Batu Pecah Mesin 2/3 cm 0.5263 m3 243,300.00 128,052.68

Upah
Kepala Tukang 0.0350 O.H 93,500.00 3,272.50
Pekerja 0.3500 O.H 74,800.00 26,180.00
Buruh Tak Terampil 2.1000 O.H 67,000.00 140,700.00
TOTAL 1,002,402.12
7 Pek. Pembesian Besi ( Polos / Ulir ) Kg

4
Bahan
Besi Polos/Ulir 1.0500 Kg 13,500.00 14,175.00
Kawat Ikat 0.0150 Kg 25,900.00 388.50

Upah
Kepala Tukang 0.0007 O.H 93,500.00 65.45
Pekerja 0.0070 O.H 74,800.00 523.60
Buruh Tak Terampil 0.0070 O.H 67,000.00 469.00
TOTAL 15,621.55

5
7 Pek. Pembesian Besi Wire Mesh M.6 Kg
Bahan
Wiremesh 1.0200 Kg 78,000.00 79,560.00
Kawat Ikat 0.0500 Kg 23,000.00 1,150.00

Upah
Mandor 0.0010 O.H 97,900.00 97.90
Kepala Tukang 0.0020 O.H 93,500.00 187.00
Pekerja 0.0250 O.H 74,800.00 1,870.00
Buruh Tak Terampil 0.0250 O.H 24,000.00 600.00
TOTAL 83,464.90

8 Pek. Begesteng Pondasi m3


Bahan
Kayu Meranti Bekisting 0.0400 m3 3,622,500.00 144,900.00
Paku Triplek/Eternit/Usuk 0.3000 Kg 14,800.00 4,440.00
Minyak Bekisting 0.1000 Ltr 30,100.00 3,010.00

Upah
Kepala Tukang 0.0260 O.H 93,500.00 2,431.00
Pekerja 0.2600 O.H 74,800.00 19,448.00
Buruh Tak Terampil 0.5200 O.H 67,000.00 34,840.00
TOTAL 209,069.00

9 Pek. Begesteng Sloof m3


Bahan
Kayu Meranti Bekisting 0.0450 m3 3,622,500.00 163,012.50
Paku Triplek/Eternit/Usuk 0.3000 Kg 14,800.00 4,440.00
Minyak Bekisting 0.1000 Ltr 30,100.00 3,010.00

Upah
Kepala Tukang 0.0260 O.H 93,500.00 2,431.00
Pekerja 0.2600 O.H 74,800.00 19,448.00
Buruh Tak Terampil 0.5200 O.H 67,000.00 34,840.00
TOTAL 227,181.50

10 Pek. Begesteng Kolom m3


Bahan
Kayu Meranti Bekisting 0.0400 m3 3,622,500.00 144,900.00
Paku Triplek/Eternit/Usuk 0.4000 Kg 14,800.00 5,920.00
Minyak Bekisting 0.2000 Ltr 30,100.00 6,020.00
Kayu Meranti Usuk 4/6, 5/7 0.0150 m3 3,900,000.00 58,500.00
Multiplek 9 mm 0.3500 Lbr 105,000.00 36,750.00

Upah
Kepala Tukang 0.0330 O.H 93,500.00 3,085.50
Pekerja 0.3300 O.H 74,800.00 24,684.00
Buruh Tak Terampil 0.6600 O.H 67,000.00 44,220.00
TOTAL 324,079.50

11 Pek. Begesteng Balok m3


Bahan
Kayu Meranti Bekisting 0.0400 m3 3,622,500.00 144,900.00
Paku Triplek/Eternit/Usuk 0.4000 Kg 14,800.00 5,920.00
Minyak Bekisting 0.2000 Ltr 30,100.00 6,020.00
Kayu Meranti Usuk 4/6, 5/7 0.0180 m3 3,900,000.00 70,200.00
Multiplek 9 mm 0.3500 Lbr 105,000.00 36,750.00

Upah
Kepala Tukang 0.0330 O.H 93,500.00 3,085.50
Pekerja 0.3300 O.H 74,800.00 24,684.00
Buruh Tak Terampil 0.6600 O.H 67,000.00 44,220.00
TOTAL 335,779.50

12 Pek. Begesteng Plat Lantai m2


Bahan
Kayu Meranti Bekisting 0.0400 m3 3,622,500.00 144,900.00
Paku Triplek/Eternit/Usuk 0.4000 Kg 14,800.00 5,920.00
Minyak Bekisting 0.2000 Ltr 30,100.00 6,020.00
Kayu Meranti Usuk 4/6, 5/7 0.0150 m3 3,900,000.00 58,500.00
Multiplek 9 mm 0.3500 Lbr 105,000.00 36,750.00

6
Upah
Kepala Tukang 0.0330 O.H 93,500.00 3,085.50
Pekerja 0.3300 O.H 74,800.00 24,684.00
Buruh Tak Terampil 0.6600 O.H 67,000.00 44,220.00
TOTAL 324,079.50

13 Pek. Begesteng Plat Dinding m3


Bahan
Kayu Meranti Bekisting 0.0300 m3 3,622,500.00 108,675.00
Paku Triplek/Eternit/Usuk 0.4000 Kg 14,800.00 5,920.00
Minyak Bekisting 0.2000 Ltr 30,100.00 6,020.00
Kayu Kamper Balok 3/5, 4/6, 5/7 0.0200 m3 6,400,000.00 128,000.00
Multiplek 9 mm 0.3500 Lbr 105,000.00 36,750.00

Upah
Mandor 0.0330 O.H 97,900.00 3,230.70
Kepala Tukang 0.0330 O.H 93,500.00 3,085.50
Pekerja 0.3300 O.H 74,800.00 24,684.00
Buruh Tak Terampil 0.6600 O.H 67,000.00 44,220.00
TOTAL 360,585.20

14 Pek. Begesteng Tangga m3


Bahan
Kayu Meranti Bekisting 0.0300 m3 3,622,500.00 108,675.00
Paku Triplek/Eternit/Usuk 0.4000 Kg 14,800.00 5,920.00
Minyak Bekisting 0.1500 Ltr 30,100.00 4,515.00
Kayu Meranti Usuk 4/6, 5/7 0.0150 m3 3,900,000.00 58,500.00
Multiplek 9 mm 0.3500 Lbr 105,000.00 36,750.00

Upah
Kepala Tukang 0.0330 O.H 93,500.00 3,085.50
Pekerja 0.3300 O.H 74,800.00 24,684.00
Buruh Tak Terampil 0.6600 O.H 67,000.00 44,220.00
TOTAL 286,349.50

15 Beton Pondasi Plat K. 225 (150 kg Besi + Begesteng) m3


Bahan
Pek. Beton. K. 225 1.0000 m3 883,246.93 883,246.93
Pek. Pembesian Besi ( Polos / Ulir ) 157.5000 Kg 13,500.00 2,126,250.00
Pek. Begesteng Pondasi 1.0000 m3 209,069.00 209,069.00
TOTAL 3,218,565.93

16 Beton Pondasi Plat K. 300 (200 kg Besi + Begesteng) FP1 m3


Bahan
Pek. Beton. K. 300 1.0000 m3 924,623.05 924,623.05
Pek. Pembesian Besi ( Polos / Ulir ) 198.2371 Kg 15,621.55 3,096,771.45
Pek. Begesteng Pondasi 1.0000 m2 209,069.00 209,069.00
TOTAL 4,230,463.49

17 Beton Sloof K. 200 (150 kg Besi + Begesteng) m3


Bahan
Pek. Beton. K. 200 1.0000 m3 861,494.90 861,494.90
Pek. Pembesian Besi ( Polos / Ulir ) 157.5000 Kg 13,500.00 2,126,250.00
Pek. Begesteng Sloof 1.0000 m3 227,181.50 227,181.50
TOTAL 3,214,926.40

18 Beton Sloof K. 300 (150 kg Besi + Begesteng) m3


Bahan
Pek. Beton. K. 300 1.0000 m3 924,623.05 924,623.05
Pek. Pembesian Besi ( Polos / Ulir ) 157.5000 Kg 15,621.55 2,460,394.13
Pek. Begesteng Sloof 3.1250 m2 227,181.50 709,942.19
TOTAL 4,094,959.36

19 Beton Kolom K. 175 (150 kg Besi + Begesteng) m3


Bahan
Pek. Beton. K. 175 1.0000 m3 833,089.67 833,089.67
Pek. Pembesian Besi ( Polos / Ulir ) 157.5000 Kg 13,500.00 2,126,250.00
Pek. Begesteng Kolom 1.0000 m3 324,079.50 324,079.50
TOTAL 3,283,419.17

21 Beton Kolom K. 300 (150 kg Besi + Begesteng) m3


Bahan
Pek. Beton. K. 300 1.0000 m3 924,623.05 924,623.05
Pek. Pembesian Besi ( Polos / Ulir ) 263.4860 Kg 15,621.55 4,116,059.68

7
Pek. Begesteng Kolom 1.0000 m3 324,079.50 324,079.50
TOTAL 5,364,762.23

22 Beton Kolom K. 350(200 kg Besi + Begesteng) m3


Bahan
Pek. Beton. K. 350 1.0000 m3 1,002,402.12 1,002,402.12
Pek. Pembesian Besi ( Polos / Ulir ) 517.7064 Kg 15,621.55 8,087,377.19
Pek. Begesteng Kolom 3.3360 m2 324,079.50 1,081,129.21
TOTAL 10,170,908.52

23 Beton Balok K. 175(100 kg Besi + Begesteng) m3


Bahan
Pek. Beton. K. 175 1.0000 m3 833,089.67 833,089.67
Pek. Pembesian Besi ( Polos / Ulir ) 105.0000 Kg 13,500.00 1,417,500.00
Pek. Begesteng Balok 1.0000 m3 335,779.50 335,779.50
TOTAL 2,586,369.17

24 Beton Balok K. 175(150 kg Besi) m3


Bahan
Pek. Beton. K. 175 1.0000 m3 833,089.67 833,089.67
Pek. Pembesian Besi ( Polos / Ulir ) 157.5000 Kg 13,500.00 2,126,250.00
Pek. Begesteng Balok 1.0000 m3 335,779.50 335,779.50
TOTAL 3,295,119.17

25 Beton Balok K. 225(150 kg Besi + Begesteng) m3


Bahan
Pek. Beton. K. 225 1.0000 m3 883,246.93 883,246.93
Pek. Pembesian Besi ( Polos / Ulir ) 157.5000 Kg 13,500.00 2,126,250.00
Pek. Begesteng Balok 1.0000 m3 335,779.50 335,779.50
TOTAL 3,345,276.43

26 Beton Balok K. 350(200 kg Besi + Begesteng) m3


Bahan
Pek. Beton. K. 350 1.0000 m3 1,002,402.12 1,002,402.12
Pek. Pembesian Besi ( Polos / Ulir ) 318.8278 Kg 15,621.55 4,980,584.91
Pek. Begesteng Balok 4.5650 m2 335,779.50 1,532,833.42
TOTAL 7,515,820.45

27 Beton Plat Lantai K. 350(200 kg Besi + Begesteng) m3


Bahan
Pek. Beton. K. 350 1.0000 m3 1,002,402.12 1,002,402.12
Pek. Pembesian Besi ( Polos / Ulir ) 210.0000 Kg 15,621.55 3,280,525.50
Pek. Begesteng Plat Lantai 3.3350 m2 324,079.50 1,080,805.13
TOTAL 5,363,732.75

28 Beton Tangga K. 350(200 kg Besi + Begesteng) m3


Bahan
Pek. Beton. K. 350 1.0000 m3 1,002,402.12 1,002,402.12
Pek. Pembesian Besi ( Polos / Ulir ) 96.2848 Kg 15,621.55 1,504,117.44
Pek. Begesteng Tangga 4.3350 m2 286,349.50 1,241,325.08
TOTAL 3,747,844.64

29 Beton Plat Lantai Wire Mesh K. 225(75 kg Besi) m3


Bahan
Pek. Beton. K. 225 1.0000 m3 883,246.93 883,246.93
Wiremesh 78.7500 Kg 78,000.00 6,142,500.00
TOTAL 7,025,746.93

30 Pemancangan Tiang Pancang dia. 50 m1


Bahan
Tiang Pancang 1.0000 m1 142,900.00 142,900.00

Upah
Mandor 0.1250 O.H 97,900.00 12,237.50

Sewa Alat
Sewa Crane 30 ton - Min. 8 Jam (Termasuk Mob/Demob
0.2180 Jam 139,800.00 30,476.40
Operator BBM)
Sewa Hammer Tiang Pancang min. 8 jam 0.2180 Jam 188,100.00 41,005.80
TOTAL 226,619.70

G. PEKERJAAN LANTAI SNI-7395-2008


1 Pek. Keramik Lantai Granit Tile 40x40 Polos m2
Bahan
Semen PC 50 Kg 0.1638 Zak 60,000.00 9,828.00
Semen Berwarna Yiyitan 0.6500 Kg 16,000.00 10,400.00

8
Pasir Pasang/Plester 0.0450 m3 142,300.00 6,403.50
Keramik Lantai Granito Salsa Pearl White Uk. 40x40 cm 1.0600 m2 206,800.00 219,208.00

Upah
Mandor 0.0350 O.H 97,900.00 3,426.50
Kepala Tukang 0.0350 O.H 93,500.00 3,272.50
Pekerja 0.3500 O.H 74,800.00 26,180.00
Buruh Tak Terampil 0.7000 O.H 67,000.00 46,900.00
TOTAL 325,618.50

2 Pek. Keramik Lantai Granit Tile 40x40 Motif m2


Bahan
Semen PC 50 Kg 0.1638 Zak 60,000.00 9,828.00
Semen Berwarna Yiyitan 0.6500 Kg 16,000.00 10,400.00
Pasir Pasang/Plester 0.0450 m3 142,300.00 6,403.50
Keramik Lantai Granito Oasis Crystal White Sand Uk. 40x40 cm 1.0600 m2 247,500.00 262,350.00

Upah
Mandor 0.0350 O.H 97,900.00 3,426.50
Kepala Tukang 0.0350 O.H 93,500.00 3,272.50
Pekerja 0.3500 O.H 74,800.00 26,180.00
Buruh Tak Terampil 0.7000 O.H 67,000.00 46,900.00
TOTAL 368,760.50

3 Pek. Keramik Lantai Granit Tile 60x60 Unpolished m2


Bahan
Semen PC 50 Kg 0.2618 Zak 60,000.00 15,708.00
Semen Berwarna Yiyitan 0.7500 Kg 16,000.00 12,000.00
Pasir Pasang/Plester 0.0550 m3 142,300.00 7,826.50
Keramik Lantai Granito Unpolished Uk. 60x60 cm 1.0600 m2 211,200.00 223,872.00

Upah
Mandor 0.0350 O.H 97,900.00 3,426.50
Kepala Tukang 0.0350 O.H 93,500.00 3,272.50
Pekerja 0.3500 O.H 74,800.00 26,180.00
Buruh Tak Terampil 0.7000 O.H 67,000.00 46,900.00
TOTAL 339,185.50

4 Pek. Keramik Lantai 20x20 m2


Bahan
Semen PC 50 Kg 0.2080 Zak 60,000.00 12,480.00
Semen Berwarna Yiyitan 0.5000 Kg 16,000.00 8,000.00
Pasir Pasang/Plester 0.0450 m3 142,300.00 6,403.50
Keramik Lantai Bermotif Uk. 20x20 cm 1.0500 m2 91,000.00 95,550.00

Upah
Mandor 0.0350 O.H 97,900.00 3,426.50
Kepala Tukang 0.0350 O.H 93,500.00 3,272.50
Pekerja 0.3500 O.H 74,800.00 26,180.00
Buruh Tak Terampil 0.7000 O.H 67,000.00 46,900.00
TOTAL 202,212.50

5 Pek. Keramik Dinding 20x25 Motif m2


Bahan
Semen PC 50 Kg 0.1860 Zak 60,000.00 11,160.00
Semen Berwarna Yiyitan 1.9400 Kg 16,000.00 31,040.00
Pasir Pasang/Plester 0.0180 m3 142,300.00 2,561.40
Keramik (Dinding) Uk. 20 x 25 Cm 1.0500 m2 60,000.00 63,000.00

Upah
Mandor 0.0450 O.H 97,900.00 4,405.50
Kepala Tukang 0.0450 O.H 93,500.00 4,207.50
Pekerja 0.4500 O.H 74,800.00 33,660.00
Buruh Tak Terampil 0.9000 O.H 67,000.00 60,300.00
TOTAL 210,334.40

H. PEKERJAAN PLAFOND SNI 2839:2008


Pek. Pasang Plafond Gypsumboard t. 9mm rangka metal
1 m2
furing
Bahan
Gypsum Board 0.3640 Lbr 70,500.00 25,662.00
Besi Hollow 20/40 2.0000 lonjor 72,500.00 145,000.00
Besi Hollow 40/40 0.7500 lonjor 100,000.00 75,000.00
Paku Asbes Sekrup 4 inchi 4.0000 bh 8100.00 32,400.00

Upah

9
Mandor 0.0250 O.H 97,900.00 2,447.50
Kepala Tukang 0.0750 O.H 93,500.00 7,012.50
Pekerja 0.1500 O.H 74,800.00 11,220.00
Buruh Tak Terampil 0.2500 O.H 67,000.00 16,750.00
TOTAL 315,492.00

2 Pek. List Gypsum 12 cm m1


Bahan
List Gypsum 1.0500 m1 17,500.00 18,375.00
Paku Triplek/Eternit/Usuk 0.0200 Kg 14,800.00 296.00
Lem Kayu 1/2 Kg 0.0250 Kg 12,000.00 300.00
Semen Putih 0.0100 Zak 83,000.00 830.00

Upah
Mandor 0.0010 O.H 97,900.00 97.90
Kepala Tukang 0.0020 O.H 93,500.00 187.00
Pekerja 0.0210 O.H 74,800.00 1,570.80
Buruh Tak Terampil 0.0210 O.H 67,000.00 1,407.00
TOTAL 23,063.70
3 Pengecatan list plafond m1
Bahan
Cat Tembok Dalam 0.0200 Kg 121,000.00 2,420.00

Upah
Kepala Tukang 0.0063 O.H 93,500.00 589.05
Pekerja 0.0630 O.H 74,800.00 4,712.40
Buruh Tak Terampil 0.0250 O.H 67,000.00 1,675.00
TOTAL 9,396.45

I. PEKERJAAN PENGECATAN
1 Pengecatan Dinding Dalam Baru m2
Bahan
Cat Tembok Dalam 0.1040 Kaleng 121,000.00 12,584.00
Kertas Gosok Halus no. 150 0.1000 Lbr 20,400.00 2,040.00
Plamir Tembok 0.1000 Kg 36,500.00 3,650.00

Upah
Kepala Tukang 0.0063 O.H 93,500.00 589.05
Pekerja 0.0630 O.H 74,800.00 4,712.40
Buruh Tak Terampil 0.0200 O.H 67,000.00 1,340.00
TOTAL 24,915.45

2 Pek. Cat Dinding Baru (3x Pengecatan) Wethershield m2


Bahan
Cat Tembok Luar 0.1040 Kg 218,000.00 22,672.00
Kertas Gosok Halus no. 150 0.1000 Lbr 20,400.00 2,040.00
Plamir Tembok 0.1000 Kg 36,500.00 3,650.00

Upah
Kepala Tukang 0.0063 O.H 93,500.00 589.05
Pekerja 0.0630 O.H 74,800.00 4,712.40
Buruh Tak Terampil 0.0200 O.H 67,000.00 1,340.00
TOTAL 35,003.45

3 Pek. Cat Plafond (3x Pengecatan) m2


Bahan
Cat Tembok Dalam 0.2080 Kg 121,000.00 25,168.00
Plamir Tembok 0.1600 Kg 36,500.00 5,840.00
Kertas Gosok Halus no. 150 0.5000 Kg 20,400.00 10,200.00

Upah
Kepala Tukang 0.0063 O.H 93,500.00 589.05
Pekerja 0.0630 O.H 74,800.00 4,712.40
Buruh Tak Terampil 0.0250 O.H 67,000.00 1,675.00
TOTAL 48,184.45

4 Water Proofing m2
Bahan
Waterproof 0.3500 Kg 85,000.00 29,750.00
Serat Fiber 1.0000 m2 10,100.00 10,100.00

Upah
Mandor 0.0025 O.H 97,900.00 244.75
Kepala Tukang 0.0075 O.H 93,500.00 701.25
Pekerja 0.0750 O.H 74,800.00 5,610.00

10
Buruh Tak Terampil 0.0500 O.H 67,000.00 3,350.00
TOTAL 49,756.00
RSNI-T-15-2002-
J. PEKERJAAN SANITASI Sanitair
1 Pek. Pipa Sanitasi PVC dia. 1/2" AW m1
Bahan
Pipa Plastik PVC Tipe AW Uk. 1/2 Pj. 4 mtr 0.1050 Btng 29,000.00 3,045.00
Perlengkapan 30% Harga Pipa 1.0000 Btng 8,700.00 8,700.00

Upah
Mandor 0.0018 O.H 97,900.00 176.22
Kepala Tukang 0.0060 O.H 93,500.00 561.00
Pekerja 0.0600 O.H 74,800.00 4,488.00
Buruh Tak Terampil 0.0360 O.H 67,000.00 2,412.00
TOTAL 19,382.22

2 Pek. Pipa Sanitasi PVC dia. 3/4" AW m1


Bahan
Pipa Plastik PVC Tipe AW Uk. 3/4 Pj. 4 mtr 0.1050 Btng 36,000.00 3,780.00
Perlengkapan 30% Harga Pipa 1.0000 Btng 10,800.00 10,800.00

Upah
Mandor 0.0018 O.H 97,900.00 176.22
Kepala Tukang 0.0060 O.H 93,500.00 561.00
Pekerja 0.0600 O.H 74,800.00 4,488.00
Buruh Tak Terampil 0.0360 O.H 67,000.00 2,412.00
TOTAL 22,217.22

3 Pek. Pipa Sanitasi PVC dia. 1" AW m1


Bahan
Pipa Plastik PVC Tipe AW Uk. 1 Pj. 4 mtr 0.3000 Btng 42,000.00 12,600.00
Perlengkapan 30% Harga Pipa 1.0000 Btng 12,600.00 12,600.00

Upah
Mandor 0.0018 O.H 97,900.00 176.22
Kepala Tukang 0.0060 O.H 93,500.00 561.00
Pekerja 0.0600 O.H 74,800.00 4,488.00
Buruh Tak Terampil 0.0360 O.H 67,000.00 2,412.00
TOTAL 32,837.22

4 Pek. Pipa Sanitasi PVC dia. 1 1/2" AW m1


Bahan
Pipa Plastik PVC Tipe AW Uk. 1 1/2 Pj. 4 mtr 0.3000 Btng 82,500.00 24,750.00
Perlengkapan 30% Harga Pipa 1.0000 Btng 24,750.00 24,750.00

Upah
Mandor 0.0018 O.H 97,900.00 176.22
Kepala Tukang 0.0060 O.H 93,500.00 561.00
Pekerja 0.0600 O.H 74,800.00 4,488.00
Buruh Tak Terampil 0.0360 O.H 67,000.00 2,412.00
TOTAL 57,137.22

5 Pek. Pipa Sanitasi PVC dia. 2" type C m1


Bahan
Pipa Plastik PVC Tipe C Uk. 2 inchi Pj. 4mtr 0.3000 Btng 47,800.00 14,340.00
Perlengkapan 30% Harga Pipa 1.0000 Btng 14,340.00 14,340.00

Upah
Mandor 0.0027 O.H 97,900.00 264.33
Kepala Tukang 0.0090 O.H 93,500.00 841.50
Pekerja 0.0900 O.H 74,800.00 6,732.00
Buruh Tak Terampil 0.0540 O.H 67,000.00 3,618.00
TOTAL 40,135.83

6 Pek. Pipa Sanitasi PVC dia. 3" type C m1


Bahan
Pipa Plastik PVC Tipe C Uk. 3 inchi Pj.4mtr 0.3000 Btng 69,000.00 20,700.00
Perlengkapan 30% Harga Pipa 1.0000 Btng 20,700.00 20,700.00

Upah
Mandor 0.0041 O.H 97,900.00 264.33
Kepala Tukang 0.0135 O.H 93,500.00 841.50
Pekerja 0.135 O.H 74,800.00 6,732.00
Buruh Tak Terampil 0.081 O.H 67,000.00 3,618.00
TOTAL 52,855.83

11
7 Pek. Pipa Sanitasi PVC dia. 4" type C m1
Bahan
Pipa Plastik PVC Tipe C Uk. 4 inchi Pj.4mtr 0.3000 Btng 89,000.00 26,700.00
Perlengkapan 30% Harga Pipa 1.0000 Btng 26,700.00 26,700.00

Upah
Mandor 0.0041 O.H 97,900.00 401.39
Kepala Tukang 0.0135 O.H 93,500.00 1,262.25
Pekerja 0.135 O.H 74,800.00 10,098.00
Buruh Tak Terampil 0.081 O.H 67,000.00 5,427.00
TOTAL 70,588.64

8 Pek. Pipa Sanitasi PVC dia. 5" type C m1


Bahan
Pipa Plastik PVC Tipe C Uk. 5 inchi Pj.6mtr 0.1670 Btng 142,700.00 23,830.90
Perlengkapan 30% Harga Pipa 1.0000 Btng 42,810.00 42,810.00

Upah
Mandor 0.0041 O.H 97,900.00 401.39
Kepala Tukang 0.0135 O.H 93,500.00 1,262.25
Pekerja 0.135 O.H 74,800.00 10,098.00
Buruh Tak Terampil 0.081 O.H 67,000.00 5,427.00
TOTAL 83,829.54

9 Pek. Pipa Sanitasi PVC dia. 6" type C m1


Bahan
Pipa Plastik PVC Tipe C Uk. 6 inchi Pj.6mtr 0.1670 Btng 166,900.00 27,872.30
Perlengkapan 30% Harga Pipa 1.0000 Btng 50,070.00 50,070.00

Upah
Mandor 0.0041 O.H 97,900.00 401.39
Kepala Tukang 0.0135 O.H 93,500.00 1,262.25
Pekerja 0.135 O.H 74,800.00 10,098.00
Buruh Tak Terampil 0.081 O.H 67,000.00 5,427.00
TOTAL 95,130.94

10 Pek. Pipa Sanitasi PVC dia. 8" type C m1


Bahan
Pipa Plastik PVC Tipe C Uk. 6 inchi Pj.6mtr 0.1670 Btng 237,120.00 39,599.04
Perlengkapan 30% Harga Pipa 1.0000 Btng 71,136.00 71,136.00

Upah
Mandor 0.0041 O.H 97,900.00 401.39
Kepala Tukang 0.0135 O.H 93,500.00 1,262.25
Pekerja 0.135 O.H 74,800.00 10,098.00
Buruh Tak Terampil 0.081 O.H 67,000.00 5,427.00
TOTAL 127,923.68

11 Pasang Kran Lokal dia. 3/4" Bh


Bahan
Kran Air Dia. 3/4 1.0000 Buah 38,900.00 38,900.00
Rol TBA 1.0000 Roll 11,800.00 11,800.00

Upah
Kepala Tukang 0.0300 O.H 93,500.00 2,805.00
Pekerja 0.1500 O.H 74,800.00 11,220.00
TOTAL 64,725.00

12 Pasang Kran dia. 3/4" Leher Angsa Bh


Bahan
Kran Air dia. 3/4" Leher Angsa 1.0000 Buah 50,160.00 50,160.00
Rol TBA 1.0000 Roll 11,800.00 11,800.00

Upah
Kepala Tukang 0.0300 O.H 93,500.00 2,805.00
Pekerja 0.1500 O.H 74,800.00 11,220.00
TOTAL 75,985.00

13 Kloset Duduk Poerselen Bh


Bahan
Closet Duduk Porselin (Komplit) Warna Putih 1.0000 Bh 3,395,600.00 3,395,600.00
Perlengkapan 6% Harga Closed 1.0000 Bh 203,736.00 203,736.00

Upah

12
Mandor 0.1600 O.H 97,900.00 15,664.00
Kepala Tukang 0.1600 O.H 93,500.00 14,960.00
Pekerja 1.1000 O.H 74,800.00 82,280.00
Buruh Tak Terampil 3.3000 O.H 67,000.00 221,100.00
TOTAL 3,933,340.00

14 Kloset Jongkok Poerselen Bh


Bahan
Closet Jongkok Porselin Warna Putih 1.0000 Bh 464,200.00 464,200.00
Semen PC 50 Kg 0.1200 Zak 60,000.00 7,200.00
Pasir Pasang/Plester 0.0100 m3 142,300.00 1,423.00

Upah
Mandor 0.1500 O.H 97,900.00 14,685.00
Kepala Tukang 0.1600 O.H 93,500.00 14,960.00
Pekerja 1.5000 O.H 74,800.00 112,200.00
Buruh Tak Terampil 1.0000 O.H 67,000.00 67,000.00
TOTAL 681,668.00

15 Pas.Wastafel Bh
Bahan
Semen PC 50 Kg 0.1200 Zak 60,000.00 7,200.00
Pasir Pasang/Plester 0.0100 m3 142,300.00 1,423.00
Wastafel 1.0000 Bh 464,000.00 464,000.00
Perlengkapan 5% Harga Closed 0.1200 Bh 464,000.00 55,680.00

Upah
Mandor 0.1000 O.H 97,900.00 9,790.00
Kepala Tukang 0.1500 O.H 93,500.00 14,025.00
Pekerja 1.4500 O.H 74,800.00 108,460.00
Buruh Tak Terampil 1.2000 O.H 67,000.00 80,400.00
TOTAL 740,978.00

16 Avoor/Floordrain Bh
Bahan
Avoor/Floordrain 1.0000 Bh 68,750.00 68,750.00

Upah
Mandor 0.0050 O.H 97,900.00 489.50
Kepala Tukang 0.0100 O.H 93,500.00 935.00
Pekerja 0.1000 O.H 74,800.00 7,480.00
Buruh Tak Terampil 0.0100 O.H 67,000.00 670.00
TOTAL 78,324.50

K. PEKERJAAN KUSEN, PINTU, & JENDELA

1 PINTU PVC DIREKSI KEET Unit


Bahan
Daun Pintu PVC 1.0000 Bh 275,000.00 275,000.00
Sealant 1.0000 Tube 60,300.00 60,300.00

Upah
Mandor 0.0300 O.H 97,900.00 2,937.00
Kepala Tukang 0.2000 O.H 93,500.00 18,700.00
Pekerja 2.0000 O.H 74,800.00 149,600.00
Buruh Tak Terampil 0.6000 O.H 67,000.00 40,200.00
TOTAL 546,737.00

2 PINTU JENDELA (P2) Unit


Aluminium Coklat Uk. 3 x 7.5, Profil 3 inchi 5.0000 m1 73,000.00 365,000.00
Kaca Polos 5 mm 0.7500 m2 87,000.00 65,250.00
Sealant 4.0000 Tube 60,300.00 241,200.00
Daun Pintu Double Triplek 1.0000 Unit 276,250.00 276,250.00
Engsel Pintu 3.0000 set 66,000.00 198,000.00
Kunci Tanam 1.0000 set 81,000.00 81,000.00
TOTAL 1,226,700.00

3 P1 Unit
Aluminium Putih Uk. 4 x 10, Profil 4 inchi 13.0800 m1 108,000.00 1,412,640.00
Kaca Polos 5 mm 21.9700 m2 87,000.00 1,911,390.00
Sealant 8.0000 Tube 60,300.00 482,400.00
Engsel Pintu 3.0000 set 66,000.00 198,000.00
Kunci Tanam 1.0000 set 81,000.00 81,000.00
TOTAL 4,085,430.00

13
3 P2 Unit
Aluminium Putih Uk. 4 x 10, Profil 4 inchi 13.1600 m1 108,000.00 1,421,280.00
Slimar Aluminium 3/8 6.6400 m1 90,000.00 597,600.00
Kaca Polos 5 mm 11.0000 m2 87,000.00 957,000.00
Sealant 8.0000 Tube 60,300.00 482,400.00
Engsel Pintu 3.0000 set 66,000.00 198,000.00
Kunci Tanam 1.0000 set 81,000.00 81,000.00
TOTAL 3,737,280.00

4 P3 Unit
Aluminium Putih Uk. 4 x 10, Profil 4 inchi 9.5600 m1 108,000.00 1,032,480.00
Kaca Polos 5 mm 1.3200 m2 87,000.00 114,840.00
Pintu Kayu Solid 1.0000 Unit 276,250.00 276,250.00
Engsel Pintu 3.0000 set 66,000.00 198,000.00
Kunci Tanam 1.0000 set 81,000.00 81,000.00
TOTAL 1,702,570.00

5 P4 Unit
Aluminium Putih Uk. 4 x 10, Profil 4 inchi 9.5600 m1 87,000.00 831,720.00
Pintu Kayu Solid 1.0000 m1 276,250.00 276,250.00
Engsel Pintu 3.0000 m2 66,000.00 198,000.00
Kunci Tanam 1.0000 Unit 81,000.00 81,000.00
TOTAL 1,386,970.00

6 J1 Unit
Aluminium Putih Uk. 4 x 10, Profil 4 inchi 29.0000 m1 87,000.00 2,523,000.00
Kaca Polos 5 mm 15.0000 m2 87,000.00 1,305,000.00
TOTAL 3,828,000.00

7 J2 Unit
Aluminium Putih Uk. 4 x 10, Profil 4 inchi 31.0000 m1 87,000.00 2,697,000.00
Kaca Polos 5 mm 18.0000 m2 87,000.00 1,566,000.00
TOTAL 4,263,000.00

8 J3 Unit
Aluminium Putih Uk. 4 x 10, Profil 4 inchi 9.5600 m1 87,000.00 831,720.00
Slimar Aluminium 3/8 6.6400 m1 90,000.00 597,600.00
Kaca Polos 5 mm 31.0000 m2 87,000.00 2,697,000.00
Engsel Jendela 4.0000 pasang 20,000.00 80,000.00
TOTAL 4,206,320.00

9 B1 Unit
Aluminium Putih Uk. 4 x 10, Profil 4 inchi 3.4000 m1 87,000.00 295,800.00
Kaca Polos 5 mm 1.2000 m2 20,000.00 24,000.00
TOTAL 319,800.00

L. PEKERJAAN ATAP
1 Pekerjaan Atap Genteng Metal Zincalume m2
Bahan
Atap Metal Zincalume 1.6000 Lbr 46,400.00 74,240.00
Peredam Panas (aluminium foil) 1.0500 m2 24,000.00 25,200.00
Perlengkapan 5% dari Harga Genteng 0.0500 Lbr 2,320.00 116.00

Upah
Mandor 0.0080 O.H 97,900.00 783.20
Kepala Tukang 0.0080 O.H 93,500.00 748.00
Pekerja 0.0750 O.H 74,800.00 5,610.00
Buruh Tak Terampil 0.1500 O.H 67,000.00 10,050.00
TOTAL 116,747.20

2 Pekerjaan Bubungan Genteng Metal Zincalume m1


Bahan
Bubungan Atap Metal Zincalume 2.5000 Bj 10,000.00 25,000.00
Perlengkapan 5% dari Garga Bubungan 0.0500 Bj 500.00 25.00
Semen PC 50 Kg 0.1600 Zak 60,000.00 9,600.00
Pasir Pasang/Plester 0.0323 m3 142,300.00 4,596.29

Upah
Mandor 0.0020 O.H 97,900.00 195.80
Kepala Tukang 0.0200 O.H 93,500.00 1,870.00
Pekerja 0.2000 O.H 74,800.00 14,960.00
Buruh Tak Terampil 0.4000 O.H 67,000.00 26,800.00
TOTAL 83,047.09

3 Pekerjaan Lisplank (calsiplank 1/30) m1

14
Bahan

15
Clasilank 1/30 1.0500 m1 27,500.00 28,875.00
Perlengkapan 5% dari Garga Bubungan 0.0500 m1 1,375.00 68.75

Upah
Mandor 0.0050 O.H 97,900.00 489.50
Kepala Tukang 0.0200 O.H 93,500.00 1,870.00
Pekerja 0.2000 O.H 74,800.00 14,960.00
Buruh Tak Terampil 0.1000 O.H 67,000.00 6,700.00
TOTAL 52,963.25

4 Pekerjaan Rangka Atap Galvalum m1


Bahan
Galvalum Canal C t. 0,75 mm 3.0000 Ljr 32,500.00 97,500.00
Reng Galvalum t. 0,75 mm 5.0000 Ljr 18,500.00 92,500.00
Perlengkapan 15% dari Garga Bubungan 0.1500 Ljr 4,875.00 731.25

Upah
Mandor 0.0050 O.H 97,900.00 489.50
Kepala Tukang 0.0200 O.H 93,500.00 1,870.00
Pekerja 0.2000 O.H 74,800.00 14,960.00
Buruh Tak Terampil 0.1000 O.H 67,000.00 6,700.00
TOTAL 214,750.75

M. PEKERJAAN BESI PROFIL


1 Pekerjaan Pemasangan Besi Profil
Bahan:
Besi Profil WF >= 200 mm 1.15 kg 21,000 24,150.00

Upah:
Mandor 0.003 O.H 97,900.00 293.70
Kepala Tukang 0.006 O.H 93,500.00 561.00
Pekerja 0.06 O.H 74,800.00 4,488.00
Buruh Tak Terampil 0.06 O.H 67,000.00 4,020.00
TOTAL 33,512.70

N. Pembuatan Direksi Keet


Bahan
Dolken kayu gelam dia 8-10 cm, panjang 4m 1.25 bt 30,300.00 37,875.00
Kayu Meranti Usuk 4/6, 5/7 0.18 m3 3,900,000.00 702,000.00
Paku Biasa 2 - 5 inchi 0.85 kg 20,640.00 17,544.00
Plat Besi/Baja 1.1 kg 28,000.00 30,800.00
Semen PC 50 Kg 0.7 zak 60,000.00 42,000.00
Pasir Pasang/Plester 0.15 m3 142,300.00 21,345.00
Pasir Cor/Beton 0.1 m3 265,300.00 26,530.00
Batu Pecah Mesin 2/3 cm 0.15 m3 243,300.00 36,495.00
Batu Bata Merah Kelas 1 (Uk. 22x11x4.5 cm) 30 bh 800.00 24,000.00
Seng Gelombang BJLS 30, Uk. (0,8 x 1,50) 0.25 lbr 63,000.00 15,750.00
Kaca Polos 5 mm 0.08 m2 87,000.00 6,960.00
Kunci Tanam 2 bh 81,000.00 162,000.00
Triplek Uk.110 x 210 x 4 mm 0.06 lbr 64,000.00 3,840.00

Upah
Mandor 0.0500 O.H 97,900.00 4,895.00
Kepala Tukang 0.3000 O.H 93,500.00 28,050.00
Pekerja 2.0000 O.H 74,800.00 149,600.00
Buruh Tak Terampil 2.0000 O.H 67,000.00 134,000.00
TOTAL 1,443,684.00

PINTU PVC DIREKSI KEET 1.0000 unit 546,737.00 546,737.00


PINTU JENDELA (P2) 1.0000 unit 1,226,700.00 1,226,700.00
Kloset Jongkok Poerselen 1.0000 unit 681,668.00 681,668.00
TOTAL LUMP SUM 3,898,789.00

16
O. Pekerjaan Sunscreen Aluminium SNI 7393:2008 No. 6.9
m2
Bahan
Sunscreen Aluminium 1.0000 m2 350,000.00 350,000.00

Upah
Mandor 0.0040 O.H 97,900.00 391.60
Kepala Tukang 0.0800 O.H 93,500.00 7,480.00
Pekerja 0.8000 O.H 74,800.00 59,840.00
Buruh Tak Terampil 0.0800 O.H 67,000.00 5,360.00
TOTAL 423,071.60
P. Pagar Sementara Seng Gelombang T 2 m m1
Bahan
Dolken kayu gelam dia 8-10 cm, panjang 4m 1.25 bt 30,300.00 37,875.00
Semen PC 50 Kg 0.1 zak 60,000.00 6,000.00
Seng Gelombang BJLS 30, Uk. (0,8 x 1,50) 1.2 m1 63,000.00 75,600.00
Pasir Cor/Beton 0.005 m3 265,300.00 1,326.50
Batu Pecah Mesin 2/3 cm 0.009 m3 243,300.00 2,189.70
Kayu Meranti Usuk 4/6, 5/7 0.072 m3 3,900,000.00 280,800.00
Paku Biasa 2 - 5 inchi 0.06 kg 20,640.00 1,238.40
Cat Meni Besi 0.45 kg 36,300.00 16,335.00

Upah
Mandor 0.0200 O.H 97,900.00 1,958.00
Kepala Tukang 0.0200 O.H 93,500.00 1,870.00
Pekerja 0.2000 O.H 74,800.00 14,960.00
Buruh Tak Terampil 0.4000 O.H 67,000.00 26,800.00
TOTAL 466,952.60
Q. INSTALASI LISTRIK
1 Pek.Instalasi Titik Lampu DL 24 W
Bahan:
Kabel NYM 3 x 2,5 mm 24 m1 12,300.00 295,200.00
Isolator 4 Unit 7,800.00 31,200.00
Fiting Plafon 1 Buah 15,500.00 15,500.00
Pipa Pralon 5/8 3 Btng 7,400.00 22,200.00
T Doos Pvc 3 Buah 3,900.00 11,700.00
Lampu philiphs downlight LED inbow 24 watt 1 Buah 260,000.00 260,000.00

Upah:
Kepala Tukang 0.05 O.H 93,500.00 4,675.00
Pekerja 0.5 O.H 74,800.00 37,400.00
Buruh Tak Terampil 0.3 O.H 67,000.00 20,100.00
TOTAL 697,975.00

2 Pek.Instalasi Titik Lampu DL 18 W


Bahan:
Kabel NYM 3 x 2,5 mm 24 m1 12,300.00 295,200.00
Isolator 4 Unit 7,800.00 31,200.00
Fiting Plafon 1 Buah 15,500.00 15,500.00
Pipa Pralon 5/8 3 Btng 7,400.00 22,200.00
T Doos Pvc 3 Buah 3,900.00 11,700.00
Lampu philiphs downlight LED outbow 18 watt 1 Buah 72,900.00 72,900.00

Upah:
Kepala Tukang 0.05 O.H 93,500.00 4,675.00
Pekerja 0.5 O.H 74,800.00 37,400.00
Buruh Tak Terampil 0.3 O.H 67,000.00 20,100.00
TOTAL 510,875.00

3 Pek.Instalasi Titik Lampu DL 12 W


Bahan:
Kabel NYM 3 x 2,5 mm 24 m1 12,300.00 295,200.00
Isolator 4 Unit 7,800.00 31,200.00
Fiting Plafon 1 Buah 15,500.00 15,500.00
Pipa Pralon 5/8 3 Btng 7,400.00 22,200.00
T Doos Pvc 3 Buah 3,900.00 11,700.00
Lampu philiphs downlight LED outbow 12 watt 1 Buah 59,900.00 59,900.00

17
Upah:
Kepala Tukang 0.05 O.H 93,500.00 4,675.00
Pekerja 0.5 O.H 74,800.00 37,400.00
Buruh Tak Terampil 0.3 O.H 67,000.00 20,100.00
TOTAL 497,875.00

5 Pekerjaan pemasangan lampu taman


Bahan:
Lampu Taman 1 Buah 214,000.00 214,000.00

Upah:
Kepala Tukang 0.05 O.H 93,500.00 4,675.00
Pekerja 0.2 O.H 74,800.00 14,960.00
Buruh Tak Terampil 0.001 O.H 67,000.00 67.00
TOTAL 233,702.00

4 Pekerjaan stop kontak


Bahan:
Kabel NYM 3 x 2,5 mm 10 m1 12,300.00 123,000.00
Pipa Pralon 5/8 2.5 Btng 7,400.00 18,500.00
Stopkontak 1 Buah 27,300.00 27,300.00
T Doos Pvc 1 Buah 3,900.00 3,900.00

Upah:
Kepala Tukang 0.05 O.H 93,500.00 4,675.00
Pekerja 0.2 O.H 74,800.00 14,960.00
Buruh Tak Terampil 0.001 O.H 67,000.00 67.00
TOTAL 192,402.00

5 Pekerjaan saklar tunggal


Bahan:
Saklar Tunggal 1 Buah 32,400.00 32,400.00

Upah:
Kepala Tukang 0.05 O.H 93,500.00 4,675.00
Pekerja 0.2 O.H 74,800.00 14,960.00
Buruh Tak Terampil 0.001 O.H 67,000.00 67.00
TOTAL 52,102.00

6 Pekerjaan saklar ganda


Bahan:
Saklar Ganda 1 buah 49,400.00 49,400.00

Upah:
Kepala Tukang 0.05 O.H 93,500.00 4,675.00
Pekerja 0.2 O.H 74,800.00 14,960.00
Buruh Tak Terampil 0.001 O.H 67,000.00 67.00
TOTAL 69,102.00

7 Pekerjaan KOTAK MCB


Bahan:
MCB 1 buah 159,000.00 159,000.00

Upah:
Kepala Tukang 0.05 O.H 93,500.00 4,675.00
Pekerja 0.2 O.H 74,800.00 14,960.00
Buruh Tak Terampil 0.001 O.H 67,000.00 67.00
TOTAL 178,702.00
R. TANAMAN
1 Rumput Gajah
Bahan:
Pupuk kandang 0.0400 krg 20,000.00 800.00
Rumput Gajah 0.5000 m2 30,000.00 15,000.00

Upah:
Mandor 0.0040 O.H 97,900.00 391.60
Buruh Tak Terampil 0.0400 O.H 67,000.00 2,680.00
TOTAL 18,871.60

18
2 pohon tinggi 2m
Bahan:
Pupuk kandang 0.08 krg 20,000.00 1,600.00
pohon 1 bh 550,000.00 550,000.00

Upah:
Mandor 0.0025 O.H 97,900.00 244.75
Buruh Tak Terampil 0.025 O.H 67,000.00 1,675.00
TOTAL 553,519.75
3 pohon perdu
Bahan:
Pupuk kandang 0.0400 krg 20,000.00 800.00
pohon perdu 1.0000 bh 55,000.00 55,000.00

Upah:
Mandor 0.0020 O.H 97,900.00 195.80
Buruh Tak Terampil 0.02 O.H 67,000.00 1,340.00
TOTAL 57,335.80
S. TAMBAHAN
1 Papan nama proyek
Bahan: Ls
Kayu Meranti Usuk 4/6, 5/7 0.0350 Btg 3,900,000.00 136,500.00
Paku Biasa 2 - 5 inchi 0.6000 Kg 20,640.00 12,384.00
Seng Talang BJLS 40 Lbr 90 1.4 m1 33,200.00 46,480.00
Cat Kayu 1.5 Kg 50,100.00 75,150.00
Semen PC 50 Kg 0.336 Zak 60,000.00 20,160.00
Pasir Cor/Beton 0.027 m3 265,300.00 7,163.10
Batu Pecah Mesin 2/3 cm 0.041 m3 243,300.00 9,975.30
TOTAL 307,812.40
2 Plat lantai smartdeck
Bahan: m3
Wiremesh 1.3 m2 78,000.00 101,400.00
Panel Beton Pracetak 8.67 m2 125,000.00 1,083,750.00
Pek. Beton. K. 300 1 m3 924,623.05 924,623.05
Paku Reng 3.2 kg 15,000.00 48,000.00
Kawat Bendrat 2.25 kg 25,900.00 58,275.00
Dolken kayu gelam dia 8-10 cm, panjang 4m 25 Btg 30,300.00 757,500.00

Upah
Mandor 0.1800 O.H 97,900.00 17,622.00
Kepala Tukang 0.1900 O.H 93,500.00 17,765.00
Pekerja 1.7400 O.H 74,800.00 130,152.00
Buruh Tak Terampil 4.7700 O.H 67,000.00 319,590.00
TOTAL 3,458,677.05

3 Pasang 1 m' Pagar Beton Pracetak (5 x 40 x 240) cm Tinggi 2.8 m


Bahan:
Panel Beton Pracetak 2.92 Lbr 125,000.00 364,587.50
Kolom Beton Pracetak 0.52 btg 270,000.00 141,480.00
Pasir Cor/Beton 0.07 m3 265,300.00 19,632.20
Err:509 0.15 m3 Err:509 Err:509
Semen PC 50 Kg 0.90 Zak 60,000.00 54,000.00

Upah
Buruh Tak Terampil 0.38 O.H 67,000.00 25,125.00
Pekerja 0.13 O.H 74,800.00 9,350.00
Kepala Tukang 0.01 O.H 93,500.00 1,122.00
Mandor 0.02 O.H 97,900.00 1,860.10
TOTAL Err:509

4 Pas. Smoke Detector


Bahan:
Smoke Detector 1 Unit 325,000.00 325,000.00

Upah
Buruh Tak Terampil 0.12 O.H 67,000.00 8,040.00
Pekerja 0.12 O.H 74,800.00 8,976.00
Kepala Tukang 0.02 O.H 93,500.00 1,402.50

19
Mandor 0.01 O.H 97,900.00 489.50
TOTAL 343,908.00

20
RENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN PEMBANGUNAN GEDUNG KANTOR DPRD SURAKARTA

NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA

I PEKERJAAN PERSIAPAN
1 Pagar Sementara Seng Gelombang T 2 m 152.00 m1 Rp 233,476.30 Rp 35,488,397.60
2 Pembersihan Lapangan dan Perataan Tanah 1408.00 m 2 Rp 11,595.00 Rp 16,325,760.00
3 Pembuatan Direksi Keet 1.00 Ls Rp 3,898,789.00 Rp 3,898,789.00
4 Uitset dan Bouwplank 144.00 m1 Rp 93,197.35 Rp 13,420,418.40
5 Papan Nama Proyek 1.00 Ls Rp 307,812.40 Rp 307,812.40
JUMLAH Rp 69,441,177.40
TOTAL PEKERJAAN PERSIAPAN Rp 69,441,177.4
II PEKERJAAN TANAH
1 Galian Tanah Pondasi 1360.71 m3 Rp 52,697.50 Rp 71,706,120.62
2 Urugan Pasir Bawah Pondasi 65.29 m 3
Rp 232,279.00 Rp 15,166,076.61
3 Urugan Pasir Bawah Lantai 115.00 m3 Rp 232,279.00 Rp 26,712,085.00
4 Urugan Tanah Kembali 928.47 m3 Rp 47,195.00 Rp 43,819,224.24
5 Pengangkutan Tanah Ke luar Proyek 432.24 m 3
Rp 34,250.00 Rp 14,804,228.56
JUMLAH Rp 172,207,735.03
TOTAL PEKERJAAN TANAH Rp 172,207,735.0
III PEKERJAAN PONDASI
1 Lantai Kerja Bawah Pondasi t= 5 cm 32.65 m3 Rp 681,560.54 Rp 22,250,395.72
2 Beton Footplate FP1 259.92 m3 Rp 4,230,463.49 Rp 1,099,582,071.46
3 Beton Footplate FP2 1.25 m3 Rp 4,230,463.49 Rp 5,288,079.37
6 Beton Kolom Pedestal 23.42 m 3
Rp 5,364,762.23 Rp 125,664,190.47
7 Beton Sloof 25/35 53.90 m3 Rp 4,094,959.36 Rp 220,718,309.60
JUMLAH Rp 1,473,503,046.63
TOTAL PEKERJAAN PONDASI Rp 1,473,503,046.6
IV PEKERJAAN STRUKTUR
A LANTAI 1
1 Kolom K1 60x40 39.07 m3 Rp 10,170,908.52 Rp 397,397,737.71
2 Kolom K4 40x40 22.50 m3 Rp 10,170,908.52 Rp 228,804,758.08
4 Kolom Praktis 15x15 1.25 m3 Rp 10,170,908.52 Rp 12,700,922.02
5 Tangga Beton 6.20 m 3
Rp 3,747,844.64 Rp 23,251,628.15
6 Bordes Tangga Beton 2.17 m3 Rp 3,747,844.64 Rp 8,123,453.26
7 Pelat Lantai 115.00 m3 Rp 5,363,732.75 Rp 616,829,266.57
JUMLAH Rp 1,287,107,765.79
B LANTAI 2
1 Kolom K1 60x40 39.07 m3 Rp 10,170,908.52 Rp 397,397,737.71
2 Kolom K4 40X40 21.31 m3 Rp 10,170,908.52 Rp 216,762,402.39
3 Kolom Praktis 15x15 2.00 m3 Rp 10,170,908.52 Rp 20,321,475.22
4 Balok B1 35x55 9.24 m3 Rp 7,515,820.45 Rp 69,446,180.96
5 Balok B2 30x50 35.70 m 3
Rp 7,515,820.45 Rp 268,314,790.08
6 Balok B3 30x40 1.62 m3 Rp 7,515,820.45 Rp 12,175,629.13
7 Balok B5 30x45 33.48 m3 Rp 7,515,820.45 Rp 251,629,668.68
8 Balok B6 25x40 3.15 m3 Rp 7,515,820.45 Rp 23,674,834.42
9 Balok BA1 20x30 0.54 m3 Rp 7,515,820.45 Rp 4,058,543.04
10 Balok BA2 20x35 12.60 m3 Rp 7,515,820.45 Rp 94,699,337.68
11 Balok BA3 20x35 1.40 m3 Rp 7,515,820.45 Rp 10,522,148.63
12 Balok BA4 20x35 0.28 m3 Rp 7,515,820.45 Rp 2,104,429.73
13 Plat Lantai tb 12 cm 124.20 m3 Rp 5,363,732.75 Rp 666,175,607.90
15 Tangga Beton 6.20 m3 Rp 3,747,844.64 Rp 23,251,628.15
16 Bordes Tangga Beton 2.17 m3 Rp 3,747,844.64 Rp 8,123,453.26
JUMLAH Rp 2,068,657,867.00
C LANTAI 3
1 Kolom K3 45X45 39.60 m3 Rp 10,170,908.52 Rp 402,767,977.41
2 Kolom K4 35x35 4.20 m3 Rp 10,170,908.52 Rp 42,717,815.79
3 Kolom Praktis 15x15 1.60 m3 Rp 10,170,908.52 Rp 16,305,237.72
4 Balok B1 35x55 9.24 m3 Rp 7,515,820.45 Rp 69,446,180.96
5 Balok B2 30x50 35.70 m3 Rp 7,515,820.45 Rp 268,314,790.08
6 Balok B3 30x40 1.62 m3 Rp 7,515,820.45 Rp 12,175,629.13
7 Balok BA1 25x35 0.90 m 3
Rp 7,515,820.45 Rp 6,764,238.41
8 Balok BA2 20x35 13.44 m3 Rp 7,515,820.45 Rp 101,012,626.86
9 Balok BA3 25x35 1.40 m3 Rp 7,515,820.45 Rp 10,522,148.63
10 Balok BA4 15x30 0.35 m 3
Rp 7,515,820.45 Rp 2,630,537.16
11 Plat Lantai tb 12 cm 129.30 m3 Rp 5,363,732.75 Rp 693,530,644.94
12 Tangga Beton 29.39 m3 Rp 3,747,844.64 Rp 110,156,649.69
13 Bordes Tangga Beton 2.17 m3 Rp 3,747,844.64 Rp 8,123,453.26
JUMLAH Rp 1,744,467,930.03
E LANTAI ATAP
1 Ring Balk 78.40 m3 Rp 3,798,776.00 Rp 297,824,038.40
2 Plat Atap tb 10 cm 16.80 m3 Rp 5,363,732.75 Rp 90,110,710.25
3 Pekerjaan Baja Profil 14040.63 Kg Rp 57,500.00 Rp 807,336,052.50
4 Pasangan Rangka Baja 4358.46 Kg Rp 35,450.00 Rp 154,507,548.80
5 Pasangan Genteng Metal 1099.28 m' Rp 116,747.20 Rp 128,337,862.02
6 Pasangan Listplank 196.00 m' Rp 52,963.25 10,380,797.00
7 Pasangan Bubungan Genteng Metal 115.20 m' Rp 83,047.09 Rp 9,567,024.77
JUMLAH Rp 1,498,064,033.73
TOTAL PEKERJAAN STRUKTURAL Rp 6,598,297,596.6

V PEKERJAAN ARSITEKTURAL
A LANTAI 1 TOTAL LANTAI 1 Rp 1,300,888,343.88
A.1 PEKERJAAN PASANGAN
1 Pasangan Bata Biasa 1 Pc : 5 Ps 872.39 m2 Rp 102,534.50 Rp 89,450,482.59
2 Pasangan Bata Trasram 1 Pc : 3 Ps 75.58 m2 Rp 107,451.00 Rp 8,121,146.58
3 Plesteran Biasa 1:5 t= 1,5 cm 1744.79 m2 Rp 42,643.10 Rp 74,403,169.16
4 Plesteran Trasram 1:3 t= 1,5 cm 151.16 m2 Rp 45,326.60 Rp 6,851,568.86
5 Acian 1895.95 m2 Rp 25,715.00 Rp 48,754,302.82
JUMLAH Rp 227,580,670.01
A.2 PEKERJAAN LANTAI DAN KERAMIK
1 Ps. Granit Tile 40x40 cm polos 484.00 m2 Rp 325,618.50 Rp 157,599,354.00
2 Ps. Granit Tile 40x40 cm motif 562.00 m 2
Rp 368,760.50 Rp 207,243,401.00
3 Ps. Keramik KM/WC 20x20 cm 104.00 m2 Rp 202,212.50 Rp 21,030,100.00
4 Ps. Dinding Keramik KM/WC 20x25 cm 336.00 m2 Rp 210,334.40 Rp 70,672,358.40
JUMLAH Rp 456,545,213.40
A.3 PEKERJAAN KUSEN
1 P1 2.00 Unit Rp 4,085,430.00 Rp 8,170,860.00
2 P2 11.00 Unit Rp 3,737,280.00 Rp 41,110,080.00
3 P3 4.00 Unit Rp 1,702,570.00 Rp 6,810,280.00
4 P4 4.00 Unit Rp 1,386,970.00 Rp 5,547,880.00
5 J1 22.00 Unit Rp 3,828,000.00 Rp 84,216,000.00
JUMLAH Rp 145,855,100.00
A.4 PEKERJAAN PLAFON
1 Ps. Plafon Gypsum 1107.50 m2 Rp 315,492.00 Rp 349,407,390.00
2 Pasang List Plafon Gypsum 534.50 m1 Rp 23,063.70 Rp 12,327,547.65
JUMLAH Rp 361,734,937.65
A.5 PEKERJAAN PENGECATAN
1 Pengecatan Dinding Dalam 1544.31 m2 Rp 24,915.45 Rp 38,477,128.76
2 Pengecatan Dinding Luar Westhershield 351.64 m2 Rp 35,003.45 Rp 12,308,613.16
3 Pengecatan Plafon 1107.50 m 2
Rp 48,184.45 Rp 53,364,278.38
4 Pengecatan List Plafon 534.50 m1 Rp 9,396.45 Rp 5,022,402.53
JUMLAH Rp 109,172,422.82
B LANTAI 2 TOTAL LANTAI 2 Rp 1,210,852,757.17
B.1 PEKERJAAN PASANGAN
1 Pasangan Bata Biasa 1 Pc : 5 Ps 823.26 m2 Rp 102,534.50 Rp 84,412,039.80
2 Pasangan Bata Trasram 1 Pc : 3 Ps 75.58 m2 Rp 107,451.00 Rp 8,121,146.58
3 Plesteran Biasa 1:5 t= 1,5 cm 1646.51 m2 Rp 42,643.10 Rp 70,212,290.58
4 Plesteran Trasram 1:3 t= 1,5 cm 151.16 m2 Rp 45,326.60 Rp 6,851,568.86
5 Acian 1797.67 m2 Rp 25,715.00 Rp 46,227,084.05
JUMLAH Rp 215,824,129.86
B.2 PEKERJAAN LANTAI DAN KERAMIK
1 Ps. Granit Tile 40x40 cm polos 657.00 m2 Rp 325,618.50 Rp 213,931,354.50
2 Ps. Granit Tile 40x40 cm motif 359.00 m 2
Rp 368,760.50 Rp 132,385,019.50
3 Ps. Keramik KM/WC 20x20 cm 104.00 m2 Rp 202,212.50 Rp 21,030,100.00
4 Ps. Dinding Keramik KM/WC 20x20 cm 336.00 m2 Rp 210,334.40 Rp 70,672,358.40
JUMLAH Rp 438,018,832.40
B.3 PEKERJAAN KUSEN
1 P2 1.00 Unit Rp 3,737,280.00 Rp 3,737,280.00
2 P3 4.00 Unit Rp 1,702,570.00 Rp 6,810,280.00
3 P4 10.00 Unit Rp 1,386,970.00 Rp 13,869,700.00
4 J1 21.00 Unit Rp 3,828,000.00 Rp 80,388,000.00
JUMLAH Rp 104,805,260.00
B.4 PEKERJAAN PLAFON
1 Ps. Plafon Gypsum 1065.00 m2 Rp 315,492.00 Rp 335,998,980.00
2 Pasang List Plafon Gypsum 1/12 503.00 m1 Rp 23,063.70 Rp 11,601,041.10
JUMLAH Rp 347,600,021.10
B.5 PEKERJAAN PENGECATAN
1 Pengecatan Dinding Dalam 1423.77 m2 Rp 24,915.45 Rp 35,473,870.25
2 Pengecatan Dinding Luar Westhershield 373.90 m2 Rp 35,003.45 Rp 13,087,789.96
3 Pengecatan Plafon 1065.00 m 2
Rp 48,184.45 Rp 51,316,439.25
4 Pengecatan List Plafon 503.00 m1 Rp 9,396.45 Rp 4,726,414.35
JUMLAH Rp 104,604,513.80
C LANTAI 3 TOTAL LANTAI 3 Rp 1,169,959,913.22
C.1 PEKERJAAN PASANGAN
1 Pasangan Bata Biasa 1 Pc : 5 Ps 681.55 m2 Rp 102,534.50 Rp 69,882,644.81
2 Pasangan Bata Trasram 1 Pc : 3 Ps 75.58 m2 Rp 107,451.00 Rp 8,121,146.58
3 Plesteran Biasa 1:5 t= 1,5 cm 1363.11 m2 Rp 42,643.10 Rp 58,127,022.83
4 Plesteran Trasram 1:3 t= 1,5 cm 151.16 m2 Rp 45,326.60 Rp 6,851,568.86
5 Acian 1514.27 m2 Rp 25,715.00 Rp 38,939,324.48
JUMLAH Rp 181,921,707.55
C.2 PEKERJAAN LANTAI DAN KERAMIK
1 Ps. Granit Tile 40x40 cm polos 643.00 m2 Rp 325,618.50 Rp 209,372,695.50
2 Ps. Granit Tile 40x40 cm motif 373.00 m2 Rp 368,760.50 Rp 137,547,666.50
3 Ps. Keramik KM/WC 20x20 cm 104.00 m 2
Rp 202,212.50 Rp 21,030,100.00
4 Ps. Dinding Keramik KM/WC 20x20 cm 336.00 m2 Rp 210,334.40 Rp 70,672,358.40
JUMLAH Rp 438,622,820.40
C.3 PEKERJAAN KUSEN
1 P2 1.00 Unit Rp 3,737,280.00 Rp 3,737,280.00
2 P3 4.00 Unit Rp 1,702,570.00 Rp 6,810,280.00
3 P4 7.00 Unit Rp 1,386,970.00 Rp 9,708,790.00
4 J1 11.00 Unit Rp 3,828,000.00 Rp 42,108,000.00
5 J2 10.00 Unit Rp 4,263,000.00 Rp 42,630,000.00
JUMLAH Rp 104,994,350.00
C.4 PEKERJAAN PLAFON
1 Ps. Plafon Gypsum 1065.00 m2 Rp 315,492.00 Rp 335,998,980.00
2 Pasang List Plafon Gypsum 1/12 491.50 m 1
Rp 23,063.70 Rp 11,335,808.55
JUMLAH Rp 347,334,788.55
C.5 PEKERJAAN PENGECATAN
1 Pengecatan Dinding Dalam 1174.97 m2 Rp 24,915.45 Rp 29,274,781.71
2 Pengecatan Dinding Luar Westhershield 339.30 m2 Rp 35,003.45 Rp 11,876,670.59
3 Pengecatan Plafon 1065.00 m2 Rp 48,184.45 Rp 51,316,439.25
4 Pengecatan List Plafon 491.50 m 1
Rp 9,396.45 Rp 4,618,355.18
JUMLAH Rp 97,086,246.72
TOTAL PEKERJAAN ARSITEKTURAL Rp 3,681,701,014.3

VI PEKERJAAN MEP
A LANTAI 1 TOTAL LANTAI 1 Rp 124,206,475.65
A.1 PEKERJAAN LISTRIK
1 Pek.Instalasi titik lampu DL 24 watt 20 titik Rp 697,975.00 Rp 13,959,500.00
2 Pek.Instalasi titik lampu DL 18 watt 22 titik Rp 510,875.00 Rp 11,239,250.00
3 Pek.Instalasi titik lampu DL 12 watt 16 titik Rp 497,875.00 Rp 7,966,000.00
4 Pek.Instalasi stop kontak 29 titik Rp 192,402.00 Rp 5,579,658.00
5 Pekerjaan saklar ganda 20 titik Rp 69,102.00 Rp 1,382,040.00
6 Pekerjaan saklar tunggal 5 titik Rp 52,102.00 Rp 260,510.00
7 pekerjaan mcb box 10 bh Rp 178,702.00 Rp 1,787,020.00
JUMLAH Rp 42,173,978.00

A.2 PEKERJAAN SANITASI


1 Pas.Instalasi air bersih 81 M¹ Rp 22,217.22 Rp 1,799,594.82
2 Pas.Instalasi air kotor 53 M¹ Rp 52,855.83 Rp 2,801,358.99
3 Pas.Instalasi limbah padat 31 M¹ Rp 70,588.64 Rp 2,188,247.84
4 Pas.Kloset Duduk 16 bh Rp 3,933,340.00 Rp 62,933,440.00
6 Pas.Wastafel 13 bh Rp 740,978.00 Rp 9,632,714.00
7 pas.keran air 22 bh Rp 64,725.00 Rp 1,423,950.00
8 Pas. Floor Drain 16 bh Rp 78,324.50 Rp 1,253,192.00
JUMLAH Rp 82,032,497.65
B LANTAI 2 TOTAL LANTAI 2 Rp 123,713,050.17
B.1 PEKERJAAN LISTRIK
1 Pek.Instalasi titik lampu DL 24 watt 10 titik Rp 697,975.00 Rp 6,979,750.00
2 Pek.Instalasi titik lampu DL 18 watt 36 titik Rp 510,875.00 Rp 18,391,500.00
3 Pek.Instalasi titik lampu DL 12 watt 12 titik Rp 497,875.00 Rp 5,974,500.00
4 Pek.Instalasi stop kontak 33 titik Rp 192,402.00 Rp 6,349,266.00
5 Pekerjaan saklar ganda 24 titik Rp 69,102.00 Rp 1,658,448.00
6 Pekerjaan saklar tunggal 2 titik Rp 52,102.00 Rp 104,204.00
7 pekerjaan mcb box 10 bh Rp 178,702.00 Rp 1,787,020.00
JUMLAH Rp 41,244,688.00

B.2 PEKERJAAN SANITASI


1 Pas.Instalasi air bersih 75 M¹ Rp 22,217.22 Rp 1,666,291.50
2 Pas.Instalasi air kotor 61 M¹ Rp 52,855.83 Rp 3,224,205.63
3 Pas.Instalasi limbah padat 43.57 M¹ Rp 70,588.64 Rp 3,075,547.04
4 Pas.Kloset Duduk 16 bh Rp 3,933,340.00 Rp 62,933,440.00
6 Pas.Wastafel 12 bh Rp 740,978.00 Rp 8,891,736.00
7 pas.keran air 22 bh Rp 64,725.00 Rp 1,423,950.00
8 Pas. Floor Drain 16 bh Rp 78,324.50 Rp 1,253,192.00
JUMLAH Rp 82,468,362.17
C LANTAI 3 TOTAL LANTAI 3 Rp 117,252,150.41
C.1 PEKERJAAN LISTRIK
1 Pek.Instalasi titik lampu DL 24 watt 20 titik Rp 697,975.00 Rp 13,959,500.00
2 Pek.Instalasi titik lampu DL 18 watt 10 titik Rp 510,875.00 Rp 5,108,750.00
3 Pek.Instalasi titik lampu DL 12 watt 14 titik Rp 497,875.00 Rp 6,970,250.00
4 Pek.Instalasi stop kontak 22 titik Rp 192,402.00 Rp 4,232,844.00
5 Pekerjaan saklar ganda 12 titik Rp 69,102.00 Rp 829,224.00
6 Pekerjaan saklar tunggal 4 titik Rp 52,102.00 Rp 208,408.00
7 pekerjaan mcb box 8 titik Rp 178,702.00 Rp 1,429,616.00
JUMLAH Rp 32,738,592.00

C.2 PEKERJAAN SANITASI


1 Pas.Instalasi air bersih 67 M¹ Rp 22,217.22 Rp 1,488,553.74
2 Pas.Instalasi air kotor 61 M¹ Rp 52,855.83 Rp 3,224,205.63
3 Pas.Instalasi limbah padat 43.57 M¹ Rp 70,588.64 Rp 3,075,547.04
4 Pas.Kloset Duduk 16 bh Rp 3,933,340.00 Rp 62,933,440.00
6 Pas.Wastafel 15 bh Rp 740,978.00 Rp 11,114,670.00
7 pas.keran air 22 bh Rp 64,725.00 Rp 1,423,950.00
8 Pas. Floor Drain 16 bh Rp 78,324.50 Rp 1,253,192.00
JUMLAH Rp 84,513,558.41
TOTAL PEKERJAAN MEP Rp 365,171,676.2
PERHITUNGAN VOLUME PEKERJAAN (BOQ)

PEKERJAAN : PEKERJAAN PLAFON & PEKERJAAN PENGECATAN


SATKER :
TAHUN ANGGARAN : 2019
LOKASI : Kota Surakarta
VOLUME PEKERJAAN (BOQ) : PEKERJAAN PLAFON & PEKERJAAN PENGECATAN
PENAMPANG
No Sketsa Bangunan URAIAN PEKERJAAN QTY VOLUME Ket.
Panjang Lebar Tinggi
1 LANTAI 1
I. Ps. Plafon Gypsum
Ps. Plafon Gypsum 1107.5 m2

II. Pasang List Plafon Gypsum


Pasang List Plafon Gypsum 534.50 m1

I. Pengecatan Dinding Dalam


Pengecatan Dinding Dalam 1544.31 m2

II. Pengecatan Dinding Luar Westhershield 351.64 m2


Pengecatan Dinding Luar Westhershield 136 m 4 m 544 m2
Pengurang
P1 2 bh 2.4 m 2.95 m 14.16 m2
J1 22 bh 3 m 2.7 m 178.20 m2
192.36
2 LANTAI 2
I. Ps. Plafon Gypsum
Ps. Plafon Gypsum 1065 m2

II. Pasang List Plafon Gypsum


Pasang List Plafon Gypsum 503.00 m1

I. Pengecatan Dinding Dalam


Pengecatan Dinding Dalam 1423.77 m2

II. Pengecatan Dinding Luar Westhershield 373.90 m2


Pengecatan Dinding Luar Westhershield 136 m 4 m 544 m2
Pengurang
J1 21 bh 3 m 2.7 m 170.10 m2
2 LANTAI 3
I. Ps. Plafon Gypsum
Ps. Plafon Gypsum 1065 m2

II. Pasang List Plafon Gypsum


Pasang List Plafon Gypsum 491.50 m1

I. Pengecatan Dinding Dalam


Pengecatan Dinding Dalam 1174.97 m2

II. Pengecatan Dinding Luar Westhershield 339.30 m2


Pengecatan Dinding Luar Westhershield 136 m 4 m 544 m2
Pengurang
J1 11 bh 3 m 2.7 m 89.10 m2
J2 10 bh 3.4 m 3.4 m 115.60 m2
204.70
PERHITUNGAN VOLUME PEKERJAAN (BOQ)

PEKERJAAN : PEKERJAAN PASANGAN


SATKER :
TAHUN ANGGARAN : 2019
LOKASI : Kota Surakarta
VOLUME PEKERJAAN (BOQ) : PEKERJAAN PASANGAN
PENAMPANG
No Sketsa Bangunan URAIAN PEKERJAAN QTY VOLUME Ket.
Panjang Lebar Tinggi
1 LANTAI 1
I. Pasangan Bata Biasa 1 Pc : 5 Ps
Pasangan Bata Biasa 1 Pc : 5 Ps 319.92 m 3.7 m 1183.704 m2
Pengurang
P1 2 bh 2.4 m 2.95 m 14.16 m2
P2 11 bh 0.9 m 2.3 m 22.77 m2
P3 4 bh 0.7 m 2.1 m 5.88 m2
P4 4 bh 1.6 m 2.3 m 14.72 m2
J1 22 bh 3 m 2.7 m 178.20 m2
Trasram 75.58 m2
872.39 m2
II. Pasangan Bata Trasram 1 Pc : 3 Ps
Pasangan Bata Trasram 1 Pc : 3 Ps 4 19.45 m 1.00 m 77.8 m2
Pengurang 8 0.6 m 0.40 m 1.92
Kolom Praktis 2 bh 0.15 m 1 m 0.30 m2
75.58 m2
III. Plesteran Biasa 1:5 t= 1,5 cm
Plesteran Biasa 1:5 t= 1,5 cm 1744.79 m2

IV. Plesteran Trasram 1:3 t= 1,5 cm


Plesteran Trasram 1:3 t= 1,5 cm 151.16 m2

V. Acian
Acian 1895.95 m2

2 LANTAI 2
I. Pasangan Bata Biasa 1 Pc : 5 Ps
Pasangan Bata Biasa 1 Pc : 5 Ps 297.95 m 3.7 m 1102.415 m2
Pengurang
P2 0 bh 0.9 m 2.3 m 0.00 m2
P3 4 bh 0.7 m 2.1 m 5.88 m2
P4 10 bh 1.2 m 2.3 m 27.60 m2
J1 21 bh 3 m 2.7 m 170.10 m2
Trasram 75.58 m2
823.26 m2
II. Pasangan Bata Trasram 1 Pc : 3 Ps
Pasangan Bata Trasram 1 Pc : 3 Ps 4 19.45 m 1.00 m 77.8 m2
Pengurang 8 0.6 m 0.40 m 1.92
Kolom Praktis 2 bh 0.15 m 1 m 0.30 m2
75.58 m2
III. Plesteran Biasa 1:5 t= 1,5 cm
Plesteran Biasa 1:5 t= 1,5 cm 1646.51 m2

IV. Plesteran Trasram 1:3 t= 1,5 cm


Plesteran Trasram 1:3 t= 1,5 cm 151.16 m2

V. Acian
Acian 1797.67 m2

2 LANTAI 3
I. Pasangan Bata Biasa 1 Pc : 5 Ps
Pasangan Bata Biasa 1 Pc : 5 Ps 267.325 m 3.7 m 989.1025 m2
Pengurang
P2 1 bh 0.9 m 2.3 m 2.07 m2
P3 4 bh 0.7 m 2.1 m 5.88 m2
P4 7 bh 1.2 m 2.3 m 19.32 m2
J1 11 bh 3 m 2.7 m 89.10 m2
J2 10 bh 3.4 m 3.4 m 115.60 m2
Trasram 75.58 m2
681.55 m2
II. Pasangan Bata Trasram 1 Pc : 3 Ps
Pasangan Bata Trasram 1 Pc : 3 Ps 4 19.45 m 1.00 m 77.8 m2
Pengurang 8 0.6 0.40 1.92
Kolom Praktis 2 bh 0.15 m 1 m 0.30 m2
75.58 m2
III. Plesteran Biasa 1:5 t= 1,5 cm
Plesteran Biasa 1:5 t= 1,5 cm 1363.105 m2

IV. Plesteran Trasram 1:3 t= 1,5 cm


Plesteran Trasram 1:3 t= 1,5 cm 151.16 m2

V. Acian
Acian 1514.265 m2
PERHITUNGAN VOLUME PEKERJAAN (BOQ)

PEKERJAAN : PEKERJAAN LANTAI DAN KERAMIK


SATKER :
TAHUN ANGGARAN : 2019
LOKASI : Kota Surakarta
VOLUME PEKERJAAN (BOQ) : PEKERJAAN LANTAI DAN KERAMIK
PENAMPANG
No Sketsa Bangunan URAIAN PEKERJAAN QTY VOLUME
Panjang Lebar Tinggi
1 LANTAI 1
I. Ps. Granit Tile 40x40 cm polos
Ruang Arsip ; keuangan ; pelayanan ; resepsionis 136.00 m2
Ruang Persiapan ; Bag. Rumah tangga 68.00 m2
Ruang Mini Perpustakaan ; Security 68.00 m2
Galeri Pemerintahan 68.00 m2
Biro Masyarakat 68.00 m2
Gudang ; Dapur 38.40 m2
Mushola 37.60 m2
Ruang Olahraga 0.00 m2
Tangga 42.50 m2
Lain" 61.50
484.00 m2
II. Ps. Granit Tile 40x40 cm motif
Koridor,Kanopi, Hall, Resepsionis 562.00 m2
m2
562.00 m2

III. Ps. Keramik KM/WC 20x20 cm


Kamar Mandi 104 m2

IV. Ps. Dinding Keramik KM/WC 20x20 cm


KM1 4 42 2m 336 m2

2 LANTAI 2
I. Ps. Granit Tile 40x40 cm Polos
Ruang Ketua DPRD 48.00 m2
Ruang Wakil Ketua DPRD ; Sekertaris 68.00 m2
Ruang Komisi 1 ; Ruang Sidang komisi 1 102.00 m2
Ruang Komisi 2 ; Ruang Sidang Komisi 2 102.00 m2
Ruang Komisi 3 ; Ruang Sidang Komisi 3 102.00 m2
Ruang Komisi 4 ; Ruang Sidang Komisi 4 116.00 m2
Ruang Komisi 5 ; Ruang Sidang Komisi 5 102.00 m2
Ruang Tunggu 30.00 m2
Tangga 42.50 m2
657.00 m2
II. Ps. Granit Tile 40x40 cm motif
Koridor 359.00 m2

III. Ps. Keramik KM/WC 20x20 cm


Kamar Mandi 104 m2

IV. Ps. Dinding Keramik KM/WC 20x20 cm


KM1 4 42 2m 336 m2

3 LANTAI 3
I. Ps. Granit Tile 40x40 cm polos
Ruang Sidang Paripurna 378.25 m2
Aula 208.25 m2
Musholla 82.00 m2
Gudang ; Dapur 44.00 m2
Tangga 42.50 m2
643.00 m2
II. Ps. Granit Tile 40x40 cm motif
Cafetaria & Restaurant 51.00 m2
Koridor 322.00 m2
373.00 m2

III. Ps. Keramik KM/WC 20x20 cm


Kamar Mandi 104 m2

IV. Ps. Dinding Keramik KM/WC 20x20 cm


KM1 4 42 2m 336 m2
Ket.

526.50

1150
588.00
1120
761.00

373
PERHITUNGAN VOLUME PEKERJAAN (BOQ)

PEKERJA: PEKERJAAN BESI DAN ALUMUNIUM


SATKER :
TAHUN A: 2019
LOKASI : Kota Surakarta
VOLUME : PEKERJAAN BESI DAN ALUMUNIUM
PENAMPANG
NoSketsa Bangunan
URAIAN PEKERJAAN QTY
Panjang Berat
1
I. Pasangan Baja Profil
1/2 KK 4 bh 32.15 m 7.54 kg
Ikat Angi 12 bh 24.00 m 2.66 kg
KK 8 bh 85.65 m 10.85 kg
Jurai 8 bh 53.05 m 10.85 kg

II. Pasangan Rangka Baja


Pasangan Rangka Baja 483.2 m 9.02 kg

III. Pasangan Kusen Alumunium


Kusen P1 2 bh 2.4 m 0.4 m
Kusen P2 12 bh 0.9 m 0.4 m
Kusen P3 12 bh 0.7 m 0.4 m
Kusen P4 21 bh 1.6 m 0.4 m
Kusen J1 54 bh 3m
Kusen J2 10 bh 3.4 m

IV. Pasangan Boven Alumunium


Pasangan 24 bh 0.60 m
JAAN (BOQ)

MPANG
VOLUME Ket.
Tinggi

969.6 kg
1032.0 kg
7434.4 kg
4604.5 kg
14040.63 kg

4358.46 kg

2.95 m 17.40 m J1 3 2.7


2.30 m 70.80 m J2 3.4 3.4
2.10 m 63.60 m P1 2.4 2.95
2.30 m 245.70 m P2 0.9 2.3
2.70 m 923.40 m P3 0.7 2.1
3.40 m 204.00 m P4 1.2 2.3
1524.90 m

0.40 m 48.00 m
HARGA SATUAN
URAIAN KEGIATAN SATUAN
(Rp)
Abu Batu M3 162,000.00
Agregat Kasar M3 250,000.00
Air Kerja Liter 27.00
Aluminium Coklat Uk. 3 x 7.5, Profil 3 inchi M 73,000.00
Aluminium Putih Uk. 4 x 10, Profil 4 inchi M 108,000.00
Angker Besi PJU Kg 12,794.00
Armature Lampu HPS 150 W Unit 1,734,900.00
Armature Lampu HPS 250 W Unit 1,844,000.00
Armature Lampu HPS 450 W Unit 2,715,240.00
Asbes Datar/Eternit Uk.100 x 100 x 0.4 mm Lembar 22,000.00
Asbes Gelombang Besar, Uk. 200 x 110 x 0.5 cm Lembar 90,000.00
Asbes Gelombang Kecil, Uk. 150 x 105 x 0.4 cm Lembar 48,000.00
Asbes Gelombang Kecil, Uk. 180 x 105 x 0.4 cm Lembar 60,000.00
Asbes Gelombang Kecil, Uk. 210 x 105 x 0.4 cm Lembar 67,000.00
Asbes Gelombang Super, Uk.150 x 105 x 0.5 cm Lembar 100,000.00
Asbes Gelombang Super, Uk.180 x 108 x 0.5 cm Lembar 110,000.00
Asbes Gelombang Super, Uk.210 x 108 x 0.5 cm Lembar 81,300.00
Aspal Curah Kg 10,900.00
Aspal panas AC 60/70 (termasuk angkutan) Kg 12,900.00
Asphalt Mixing Plant Jam 4,025,400.00
Bambu Bongkotan Dia. 10 - 12 Cm, P 3.00 mtr Batang 22,000.00
Bambu Bongkotan Dia. 10 - 12 Cm, P 3.00 mtr Batang 22,000.00
Bambu Ori Dia. 10 - 12 Cm, P 3.00 mtr Batang 36,000.00
Bata Berongga Expose Buah 4,100.00
Batu Ampyang M2 68,900.00
Batu Bata Merah Kelas 1 (Uk. 22x11x4.5 cm) Buah 800.00
Batu Bobos Uk 10 x 20 x 1.5 cm M2 190,000.00
Batu Kali Belah 15/20 cm M3 428,000.00
Batu Klingker M2 36,000.00
Batu Krikil Beton M3 238,500.00
Batu Pecah Mesin 1/2 cm M3 466,000.00
Batu Pecah Mesin 5/7 cm M3 216,000.00
Batu Pecah Mesin 0.5/1 cm m3 466,000.00
Batu Pecah Mesin 2/3 cm m3 243,300.00
BBM Subsidi Diesel Liter 7,500.00
BBM Subsidi Diesel Liter 7,500.00
Besi Angkur Dia. 16 mm panjang 70 cm Buah 35,000.00
Besi Angkur Dia. 16 mm panjang 70 cm M2 35,000.00
Besi Hollow 20/40 lonjor 72,500.00
Besi Hollow 40/40 lonjor 100,000.00
Besi Pipa Galvanish Medium 1 1/4 inchi M 292,900.00
Besi Pipa Galvanish Medium 1 inchi M 58,900.00
Besi Pipa Galvanish Medium 1/2 inchi M 33,600.00
Besi Pipa Galvanish Medium 2 1/2 inchi M 187,000.00
Besi Pipa Galvanish Medium 2 inchi M 187,000.00
Besi Pipa Galvanish Medium 5 inchi M 97,600.00
Besi Pipa Galvanish Medium 6 inchi M 173,900.00
Besi Pipa Galvanish Medium 8 inchi M 55,100.00
Besi Pipa Putih (Stainless) SCH 40 Welded uk. 1 inch Buah 140,000.00
Besi Pipa Putih (Stainless) SCH 40 Welded uk. 2 inch Buah 107,500.00
Besi Polos/Ulir Kg 13,500.00
Besi Profil WF >= 200 mm Kg 21,000.00
Besi Siku L.20.20.2 Kg 9,400.00
Besi Siku L.30.30.3 Kg 9,400.00
Beugel + Mur Baut ornamen Buah 120,000.00
Beugel + Mur Baut ornamen Buah 120,000.00
Biaya Menggilas dengan Mesin Gilas (walles) (1 hari = 5 jam) Jam 152,257.14
Blank Flanged 100 Buah 99,000.00
Buis Beton Bulat Ukuran 100 x 50 cm Buah 320,000.00
Cat Besi Kg 63,000.00
Cat Genteng 4 Kg Kg 196,000.00
Cat Kayu Kg 50,100.00
Cat Meni Kayu Kg 25,000.00
Cat Meni Besi Kg 36,300.00
Cat Road Line Kaleng 54,000.00
Cat Tembok Luar Kaleng 218,000.00
Cat Tembok Dalam Kaleng 121,000.00
Clear Gloss Kg 63,000.00
Closet Duduk Porselin (Komplit) Warna Putih Buah 3,395,600.00
Closet Jongkok Porselin Warna Putih Buah 464,200.00
Coumpond Per Kaleng 33,800.00
Cover 1000x1000x2400 (K 350, Besi 160 Kg) (Fabrikasi) Per Kaleng 2,719,200.00
Curbing Beton Type A panjang 60 cm Buah 60,000.00
Daun Pintu PVC Buah 275,000.00
Dempul Tembok Kg 33,000.00
Dolken kayu gelam dia 8-10 cm, panjang 4m Batang 30,300.00
Elbow 45o AW Dim. 2 inchi Buah 29,000.00
Electrode Baja Kg 58,100.00
Electrode Las Kg 38,000.00
Engsel H Pasang 10,900.00
Engsel Jendela Pasang 20,000.00
Engsel Pintu Pasang 66,000.00
Eternit Lembar 62,000.00
FBBT 100 Buah 446,600.00
Fiber Glas M2 40,700.00
Filler Liter 1,800.00
Fiting Plafon Buah 15,500.00
Fitrase M2 358,500.00
Galian Tanah Cadas/Rabat m3 155,700.00
Gedeg Guling M2 50,000.00
Genteng Flam Pres Jawa Buah 3,000.00
Genteng Galvalume Lembar 60,000.00
Genteng Kaca Buah 11,000.00
Genteng Karang Pilang / Wisma Buah 20,000.00
Genteng Wuwung Galvalume Buah 86,000.00
Genteng Wuwung Jawa Buah 12,000.00
Genteng Wuwung Karang Pilang / Wisma Buah 13,000.00
Glangsing 25 kg (isi 150 kg sedimen) Lembar 2,150.00
Gorden Ekslusif M2 57,475.00
Got Talang R.25 (1/2 lingkaran) Buah 35,000.00
Got Talang R.25 (segmen) Buah 34,000.00
Got Talang R.10 (1/2 lingkaran) Buah 28,000.00
Got Talang R.10 (segmen) Buah 26,000.00
Got Talang R.15 (1/2 lingkaran) Buah 32,000.00
Got Talang R.15 (segmen) Buah 27,000.00
Grass Block 54cmx36cmx10cm M2 87,000.00
Grendel besar Buah 22,000.00
Grendel Biasa (Kecil) Buah 10,000.00
Grendel Espanyolet Buah 87,100.00
Grendel Tanam Buah 112,000.00
Grounding Roud (Arde) 16 mm Buah 339,150.00
Gymfloor M2 310,000.00
Gypsum Board Lembar 70,500.00
Hak Angin Kuningan Lurus Maju/Mundur Pasang 15,500.00
Hak Angin Sikutan Biasa Pasang 15,000.00
Isolator Unit 7,800.00
Kabel 10 mm m 9,750.00
Kabel Glen / Water Mur PG-19 Buah 4,325.00
Kabel Glen / Water Mur PG-7 Buah 1,325.00
Kabel NFAX 2X (Twisted) 2 x 16 mm m 13,300.00
Kabel NFAX 2X (Twisted) 4 x 16 mm m 22,500.00
Kabel NYM 3 x 2,5 mm m 12,300.00
Kaca Gravier m2 1,590,000.00
Kaca Polos 5 mm M2 87,000.00
Kaca Ryband 5 mm M2 136,700.00
Kaca Stainglass m2 2,650,000.00
Kapur Pasang M3 92,900.00
Karpet Wold Cels M2 323,700.00
Kawat Bendrat Kg 25,900.00
Kawat Duri Roll 94,000.00
Kawat Harmonika lebar 90 cm M2 24,000.00
Kawat Ikat Kg 23,000.00
Kawat Nyamuk Kasa Aluminium M2 35,000.00
Kawat Nyamuk Kasa Plastik, Lebar 90 cm M2 12,000.00
Kayu Jati Balok 5/7, 6/15, 6/12, 8/12 M3 18,417,200.00
Kayu Jati Papan 2/20, 4/10 M3 18,417,200.00
Kayu Kamper Balok 3/5, 4/6, 5/7 M3 6,400,000.00
Kayu Kamper Balok 6/12, 6/15, 8/12 M3 6,895,000.00
Kayu Kamper Balok 8/12 M3 9,000,000.00
Kayu Meranti Balok 6/15, 6/12, 8/12 M3 4,100,000.00
Kayu Meranti Bekisting M3 3,622,500.00
Kayu Meranti Papan 2/20, 4/10 M3 4,347,000.00
Kayu Meranti Reng 2/3, 3/4 M3 3,000,000.00
Kayu Meranti Usuk 4/6, 5/7 M3 3,900,000.00
Kemasan Plastik Buah 3,800.00
Keni Pipa PVC ½ inchi (Putih) Buah 3,700.00
Keramik (Dinding) Uk. 20 x 25 Cm M2 60,000.00
Keramik (Plint) Uk. 7,5 x 20 Cm Buah 61,000.00
Keramik Lantai Bermotif Uk. 20x20 cm M2 91,000.00
Keramik Lantai Bermotif Uk. 30x30 cm M2 130,000.00
Keramik Lantai Bermotif Uk. 40x40 cm M2 145,000.00
Keramik Lantai Granito Oasis Crystal White Sand Uk. 40x40 cm M2 247,500.00
Keramik Lantai Granito Salsa Pearl White Uk. 40x40 cm M2 206,800.00
Keramik Lantai Granito Unpolished Uk. 60x60 cm M2 211,200.00
Keramik Lantai Marmer M2 608,000.00
Keramik Lantai Putih Uk. 40 x 40 Cm M2 79,000.00
Keramik Lantai Putih Uk. 30 x 30 Cm M2 70,000.00
Keramik Lantai(porcelain) Uk. 30x30 M2 120,000.00
Kertas Gosok Halus no. 150 Lembar 20,400.00
Kertas Gosok Kasar Lembar 20,000.00
Klem PVC Buah 3,000.00
Konektor Kabel PJU Buah 15,725.00
Kran Air Dia. 3/4 Buah 38,900.00
Krepyak Nako Buah 14,100.00
Kuas 4 inchi Buah 12,000.00
Kunci Tanam Buah 81,000.00
Kunci Tanam Besar (Kuningan) Buah 96,000.00
L PVC 100 x 45 Buah 283,000.00
L PVC 100 x 90 Buah 283,000.00
Lampu Jalan Raya LED Unit 8,568,000.00
Lampu Pedestrian LED Unit 7,340,000.00
Lampu Taman Unit 214,000.00
Lapis Perekat/Tack Coat Liter 16,137.90
Lem Kayu 1/2 Kg Kg 12,000.00
Lem PVC Buah 14,300.00
Lem Wall Paper kg 56,000.00
Logo Pemkot untuk PJU Buah 75,000.00
MCB C120N 100 A 3 Phase Buah 1,757,800.00
MCB C60N 10 A 1 Phase Buah 159,000.00
MCB C60N 16 A 1 Phase Buah 159,000.00
MCB C60N 25 A 1 Phase Buah 159,000.00
MCB C60N 25 A 3 Phase Buah 535,500.00
MCB C60N 40 A 1 Phase Buah 159,000.00
MCB C60N 40 A 3 Phase Buah 582,900.00
MCB C60N 50 A 1 Phase Buah 233,200.00
MCB C60N 6 A 1 Phase Buah 159,000.00
MCB C60N 63 A 1 Phase Buah 268,800.00
Minyak Bekisting Liter 30,100.00
Minyak Pelumas Liter 28,300.00
Minyak Tanah Liter 8,700.00
Multiplek 9 mm Lembar 105,000.00
Mur + Ring untuk Angker Buah 3,420.00
Pabrikasi/Elektroda Baja (20%) M2 35,000.00
Pagar BRC Dia. 6 mm, panjang 240 cm, tinggi 120 cm Unit 348,200.00
Paku Asbes Sekrup 4 inchi Buah 8,100.00
Paku Biasa 2 - 5 inchi Doz 20,640.00
Paku Klem (No 4) / Beton Doz 19,000.00
Paku Klem (No 4) / Beton Doz 19,000.00
Paku Reng Kg 15,000.00
Paku Seng Payung Kg 23,300.00
Paku Triplek/Eternit/Usuk Kg 14,800.00
Panel Kwh meter 1 phase Buah 1,121,600.00
Panel Kwh meter 3 phase Buah 1,064,000.00
Panel PJU Buah 1,121,600.00
Papan Semen 1200x2400x35mm Lembar 63,000.00
Pasir Alam M3 248,400.00
Pasir Cor/Beton M3 265,300.00
Pasir Pasang/Plester M3 142,300.00
Pasir Urug M3 176,000.00
Pekerjaan Bekisting Lantai m2 378,800.00
Pekerjaan Beton ( 1Pc : 2 Ps : 3 Kr) m3 1,153,439.15
Pekerjaan Pembesian dengan besi beton (polos/ulir) kg 14,498.00
Pekerjaan Pengelasan dengan las listrik cm 2,510.20
Pekerjaan Plat Tutup Beton (1 Pc : 2 Ps : 3 Kr) m3 3,057,799.15
Pemakaian Spesi Campuran Strous Pile (1 Pc : 1,5 Ps : 2,5 Kr) m3 981,908.00
Pemasangan dan Penarikan Kabel m 4,950.00
Pemasangan Panel Lampu PJU Unit 169,200.00
Pemasangan Pipa Galvanis Termasuk Elektrode m 10,301.10
Pengecatan Kayu (1 plamir, 1 lapis cat dasar, 3 lapis cat penutup) m2 61,155.00
Penggalian Tanah Keras m3 102,840.00
Perakitan Panel Penerangan Jalan Umum (PJU) Unit 162,000.00
Perakitan Panel Penerangan Jalan Umum (PJU) Unit 167,750.00
Pilot Lamp Buah 42,500.00
Pintu Pagar Besi Komplit dengan Aksesoris M2 790,000.00
Pintu Swing Ganda BRC/PMG Uk. 1.2x3.00 m2 Unit 493,300.00
Pipa Besi Galvanish Dim. 2 M 110,622.91
Pipa Besi Galvanish Dim. 4 M 261,942.80
Pipa Besi Galvanish Dim. 4 M 261,942.80
Pipa Besi Galvanish Med A, Dim. 3/4 M 45,600.00
Pipa Besi Galvanish Dim. 4 m 261,942.80
Pipa Cooker 150 M 184,400.00
Pipa Pe Warna Hitam 12 mm M 24,900.00
Pipa Plastik PVC Tipe AW Uk. 1 Pj. 4 mtr Batang 42,000.00
Pipa Plastik PVC Tipe AW Uk. 1/2 Pj. 4 mtr Batang 29,000.00
Pipa Plastik PVC Tipe AW Uk. 2 Pj. 4 mtr Batang 127,000.00
Pipa Plastik PVC Tipe AW Uk. 3 Pj. 4 mtr Batang 210,000.00
Pipa Plastik PVC Tipe AW Uk. 3/4 Pj. 4 mtr Batang 36,000.00
Pipa Plastik PVC Tipe AW Uk. 4 Pj. 4 mtr Batang 305,000.00
Pipa Plastik PVC Tipe AW Uk. 5 Pj. 4 mtr Batang 479,600.00
Pipa Plastik PVC Tipe C Uk. 1 ½ inchi Pj.4mtr Batang 27,700.00
Pipa Plastik PVC Tipe C Uk. 2 inchi Pj. 4mtr Batang 47,800.00
Pipa Plastik PVC Tipe C Uk. 3 inchi Pj.4mtr Batang 69,000.00
Pipa Plastik PVC Tipe C Uk. 4 inchi Pj.4mtr Batang 89,000.00
Pipa Plastik PVC Tipe C Uk. 5 inchi Pj.6mtr Batang 142,700.00
Pipa Plastik PVC Tipe C Uk. 6 inchi Pj.6mtr Batang 166,900.00
Pipa Pralon 5/8 Batang 7,400.00
Pipa PVC 110 M 26,200.00
Pipa PVC 160 M 90,200.00
Pipa PVC Pelaluan Arde Dim. ½ inchi (Putih) M 6,350.00
Plamir Besi Kg 32,100.00
Plamir Tembok Kg 36,500.00
Plat Besi/Baja Kg 28,000.00
Plat Strip uk 3 x 40 mm M 40,000.00
Produksi ATB / ATBL / Lapis Beton untuk LPA (Laston Atas) Ton 1,043,328.00
Produksi Dan Penghamparan Laston Lapis Antara Leveling / AC Ton
- BC Leveling 1,061,586.77
Produksi Lapis tipis aspal beton AC (lataston) menggunakan alat Ton 1,212,012.00
Rangka Galvalume Campuran M2 264,900.00
Rangka Galvalume Uk 0.5mm M2 245,000.00
Rangka Galvalume Uk 0.8mm M2 312,000.00
Rangka Metal Stud M3 4,496,500.00
Renolith Kg 41,500.00
Rol TBA Roll 11,800.00
Roll Pipa 2 Unit 42,999.80
Saklar Ganda Unit 49,400.00
Saklar Tunggal Unit 32,400.00
Sapu Ijuk Buah 27,500.00
Sealant Tube 60,300.00
Semen Berwarna Yiyitan Kg 16,000.00
Semen PC 50 Kg Zak 60,000.00
Semen PC 40 Kg Zak 53,000.00
Seng Datar BJLS 40 Lembar 55,000.00
Seng Gelombang BJLS 30, Uk. (0,8 x 1,50) M1 63,000.00
Seng Talang BJLS 40 Lbr 90 M1 33,200.00
Serat Fiber Lembar 10,100.00
Service Kabel Buah 31,200.00
Shanding Kg 70,000.00
Sirtu M3 205,000.00
Slimar Aluminium 3/8 M 90,000.00
Stenless Tie + Clip (Yuke) + Ring Buah 11,900.00
Stiker Reflektive 10 x 100 cm cm 12,000.00
Stopkontak Buah 27,300.00
Stopper/Uskup Tb 6 cm abu-abu Buah 4,800.00
Stopper/Uskup Tb 6 cm warna Buah 5,500.00
Stopper/Uskup Tb 8 cm abu-abu Buah 6,000.00
Stopper/Uskup Tb 8cm warna Buah 7,000.00
T Doos Pvc Buah 3,900.00
Tabung Acitlyn (Karbit) Buah 316,500.00
Tabung Oksigen Besar Buah 359,800.00
Tack Coat Liter 14,100.00
Tanah Katel M3 116,100.00
Tanah Taman m3 116,100.00
Teakwood Uk. 122 x 244 x 4 mm Lembar 83,700.00
Tee 100 x 100 Buah 430,000.00
Tee 150 x 100 Buah 749,000.00
Tee 150 x 150 Buah 765,000.00
Teer Kg 7,400.00
Thinner A Liter 30,000.00
Thinner A Special Liter 37,500.00
Tiang Biasa 5 m tanam Unit 2,500,000.00
Tiang Cabang Biasa 1-7 m Batang 1,443,300.00
Tiang Cabang Biasa 2-5 m Unit 1,433,300.00
Tiang Cabang Biasa 2-7 m Batang 1,554,000.00
Tiang Oktagonal 5 m Single Hot Dipped Galvanized dengan Batang
Flenders 2,405,400.00
Time Switch Sul 181 d Unit 487,500.00
Triplek Uk.110 x 210 x 4 mm Lembar 64,000.00
U Gutter U1000/1000-2400 (K 350 ; Besi 130 Kg) (Fabrikasi) Buah 2,719,200.00
Valve 100 Buah 1,085,100.00
Valve 150 Buah 2,277,100.00
Vertical Blind M2 224,000.00
Wall Paper M2 300,000.00
Wastafel Buah 464,000.00
Waterproof Kg 85,000.00
Wiremesh M2 78,000.00
Wood Filler Kg 38,000.00
Pipa Plastik PVC Tipe AW Uk. 1 1/2 Pj. 4 mtr Batang 82,500.00
Tiang Pancang Batang 142,900.00
Semen Putih Zak 83,000.00
List Gypsum m1 17,500.00
Pipa Plastik PVC Tipe C Uk. 6 inchi Pj.6mtr Batang 237,120.00
Kran Air dia. 3/4" Leher Angsa Buah 50,160.00
Kitchen zinck Buah 125,000.00
Avoor/Floordrain Buah 68,750.00
Atap Metal Zincalume Lembar 46,400.00
Peredam Panas (aluminium foil) M2 24,000.00
Bubungan Atap Metal Zincalume Buah 10,000.00
Clasilank 1/30 m1 27,500.00
Galvalum Canal C t. 0,75 mm Ljr 32,500.00
Reng Galvalum t. 0,75 mm Buah 18,500.00
Sunscreen Aluminium m2 350,000.00
Lampu philiphs 10 watt Buah 35,000.00
Lampu philiphs downlight LED outbow 12 watt Buah 59,900.00
Lampu philiphs downlight LED outbow 18 watt Buah 72,900.00
Lampu philiphs downlight LED inbow 24 watt Buah 260,000.00
Sunscreen Aluminium m2 350,000.00
MCB Buah 159,000.00
Pupuk kandang krg 20,000.00
Rumput Gajah m2 30,000.00
Pohon tinggi 2 meter Buah 550,000.00
Pohon perdu Buah 55,000.00
Panel Beton Pracetak Lembar 125,000.00
Kolom Beton Pracetak Batang 270,000.00
Daun Pintu Double Triplek Unit 276,250.00
Smoke Detector Unit 325,000.00
HARGA SATUAN
URAIAN KEGIATAN SATUAN
(Rp)
Kepala Tukang Orang Hari 93,500.00
Mandor Orang Hari 97,900.00
Operator Alat Konstruksi (Excavator) Orang Hari 88,000.00
Pembantu Operator Orang Hari 82,500.00
Pembantu Supir Orang Hari 67,000.00
Pembantu Tukang Orang Hari 67,000.00
Sopir Orang Hari 88,000.00
Buruh Tak Terampil Orang Hari 67,000.00
Tenaga Pemasak Aspal Orang Hari 99,000.00
Tenaga Surveyor Orang Hari 80,000.00
Pekerja Orang Hari 74,800.00
HARGA SATUAN
URAIAN KEGIATAN SATUAN
(Rp)
Sewa Alat Bantu 1set @ 3 alat M3 1,100.00
Sewa Alat Bantu Pembuatan Aspal Emulsi Jam 20,400.00
Sewa Alat Bantu Pembuatan Laston Renolith Jam 12,800.00
Sewa Alat Bantu Penerangan Jalan Umum (PJU) Jam 6,700.00
Sewa Alat Bantu Strouss Pile Jam 10,200.00
Sewa Alat Las Hari 15,300.00
Sewa Amp 10 T Min 5 jam Jam 263,900.00
Sewa Ashpalt Finisher Min 3 jam Jam 1,062,300.00
Sewa Aspal Sprayer Min 4 Jam Jam 28,000.00
Sewa Bucket dan Crane / Draglin Scraper Jam 81,400.00
Sewa Compresor Min. 5 Jam Jam 95,100.00
Sewa Compresor 250 CFM (Min 5 jam) Jam 35,600.00
Sewa Concrete Mixer 0.50 m3 (Min 3 jam) Jam 66,100.00
Sewa Concrete Pump Min 3 Jam Jam 66,100.00
Sewa Concrete Vibrator Jam 15,300.00
Sewa Crane 30 ton - Min. 8 Jam (Termasuk Mob/Demob Jam 139,800.00
Operator
Sewa DumpBBM)
Truk 5 Ton Jam 70,000.00
Sewa Escavator 6m3 Jam 132,200.00
Sewa Generator 5000 Watt Unit 700,000.00
Sewa Motor Grader 125 - 140 pk Min 5 jam Jam 279,600.00
Sewa Pan Mixer Jam 20,400.00
Sewa Pneumatic Tire Roller Min 5 jam Jam 223,700.00
Sewa Stemper Jam 113,700.00
Sewa Tandem Roller Jam 268,400.00
Sewa Theodolite Hari 352,300.00
Sewa Truk Kelas 3 Dalam Kota Hari 778,500.00
Sewa Truk Tangki Air min 5 jam Hari 503,200.00
Sewa Vibrator Roller Min 5 jam Jam 137,300.00
Sewa Walles Min 5 Jam Jam 107,400.00
Sewa Welding Set (min 5 jam) Hari 30,500.00
Sewa Wheel Loader 1.7 - 2 m3 (min 5 jam) Jam 581,500.00
Sewa Hammer Tiang Pancang min. 8 jam Jam 188,100.00
PERHITUNGAN VOLUME PEKERJAAN (BOQ)

PEKERJAAN : PEKERJAAN PERSIAPAN


SATKER :
TAHUN ANGGARAN : 2019
LOKASI : Kota Surakarta
VOLUME PEKERJAAN (BOQ) : PEKERJAAN PERSIAPAN
PENAMPANG
No Sketsa Bangunan URAIAN PEKERJAAN QTY VOLUME
Panjang Lebar Tebal
1
I. Pagar Sementara Seng Gelombang T 2 m
Pagar Sementara Seng Gelombang T 2 m 44 m 32 m 152

II. Pembersihan Lapangan dan Perataan Tanah


Pembersihan Lapangan dan Perataan Tanah 44 m 32 m 1408

III. Pembuatan Direksi Keet


Pembuatan Direksi Keet 1 Ls 1

IV. Uitset dan Bouwplank


Uitset dan Bouwplank 40 m 28 m 144

V. Papan Nama Proyek


Papan Nama Proyek 1 Ls 1
VOLUME Ket.

m'

m2

Ls

m'

Ls
PERHITUNGAN VOLUME PEKERJAAN (BOQ)

PEKERJAAN : PEKERJAAN TANAH


SATKER :
TAHUN ANGGARAN : 2019
LOKASI : Kota Surakarta
VOLUME PEKERJAAN (BOQ) : PEKERJAAN TANAH
PENAMPANG
No Sketsa Bangunan URAIAN PEKERJAAN QTY VOLUME Ket.
Panjang Lebar Tebal
1
I. Galian Tanah Pondasi
FP1 80 bh 2.85 m 2.85 m 1.6 m 1352.00 m3
FP2 2 bh 1.25 m 1.25 m 1.6 m 8.71 m3
1360.71 m3
II. Urugan Pasir Bawah Pondasi

FP1 80 bh 2.85 m 2.85 m 0.10 m 64.98 m3


FP2 2 bh 1.25 m 1.25 m 0.10 m 0.31 m3
65.29 m3
III. Urugan Pasir Bawah Lantai
Urugan Pasir Bawah Lantai 1150 m2 0.10 m 115.00 m3
115.00 m3
IV. Urugan Tanah Kembali
Galian Tanah Pondasi 1360.71 m3
Urugan Pasir Bawah Lantai 115.00 m3
Lantai Kerja Bawah Pondasi t= 5 cm 32.65 m3
Beton Footplat 261.17 m3
Beton Kolom Pedestal 23.42 m3
Sloof 53.90 m4
928.47 m3
V. Pegangkutan Tanah Ke luar Proyek
Pegangkutan Tanah Ke luar Proyek 432.24 m3
PERHITUNGAN VOLUME PEKERJAAN (BOQ)

PEKERJAAN : PEKERJAAN PONDASI


SATKER :
TAHUN ANGGARAN : 2019
LOKASI : Kota Surakarta
VOLUME PEKERJAAN (BOQ) : PEKERJAAN PONDASI
PENAMPANG
No Sketsa Bangunan URAIAN PEKERJAAN QTY VOLUME Ket.
Panjang Lebar Tebal
1
I. Beton Footplate FP1
Beton Footplate FP1 80 bh 2.85 m 2.85 m 0.4 m 259.92 m3

II. Beton Footplate FP2


Beton Footplate FP2 2 bh 1.25 m 1.25 m 0.4 m 1.25 m3

III. Beton Kolom Pedestal


FP1 80 bh 0.6 m 0.4 m 1.2 m 23.04 m3
FP2 2 bh 0.4 m 0.4 m 1.2 m 0.384 m3
23.424 m3

VI. Beton Sloof 25/35


Beton Sloof 25/35 616 m 0.25 m 0.35 m 53.9 m3

VII. Lantai Kerja Bawah Pondasi t= 5 cm


FP1 80 bh 2.85 m 2.85 m 0.05 m 32.49 m3
FP2 2 bh 1.25 m 1.25 m 0.05 m 0.15625 m3
32.6463 m3
FP1 10 banyak ba banyak atapanj banyak t/l total p d
Memanjang Tump 8 6 2.8 8 313.6 19 2.23
lap 6 6 1.2 8 115.2 19 2.23
melebar Tump 20 17 3.25 8 962 19 2.23
lap 8 8 3.25 8 416 19 2.23

FP2 2 banyak ba banyak atapanj total panjadiameter d


Memanjang 1.25 1.05 9 20.7 16 1.57 32.499
melebar 1.25 1.05 9 20.7 13 1.04 21.528
berat
699.328 6993.28
256.896 2568.96 RERATA
2145.26 21452.6 198.2371
927.68 9276.8
4029.164 40291.64
40291.64 kg
155.0155 kg/m3

berat
64.998
43.056

108.054 kg

86.4432 kg/m3
BANYAK UTAMA (KG) n PANJANG
K1 4 20 132 0.022 2.23 23548.80 21 2.08 10
K2 4 16 81 0.022 2.23 11560.32 21 1.68 10
K3 4 12 0 0.019 2.23 0.00 21 1.48 10
K4 4 8 0 0.019 2.23 0.00 21 1.08 10
K5 4 4 0 0.019 2.23 0.00 21 0.88 10
P1 2 10 80 0.019 2.23 4923.84 11 2.08 10
P2 2 8 2 0.019 2.23 98.48 11 1.08 10
SENGKANG (KG) kg
0.62 3574.77 27123.57 694.1946 RERATA
0.62 1771.76 13332.08 341.2183 517.7064
0.62 0.00 0.00 0
0.62 0.00 0.00 0
0.62 0.00 0.00
0.62 1134.85 6058.69 263.486 kg
0.62 14.73 113.21
Tulangan utama 1 batang balok anak
jenis panjang panjang lap panjang tump jumlah lap jumlah tump total panjang
BA1 3 1.5 1.5 4 2 9
BA2 4 2 2 4 2 12
BA3 4 2 2 4 2 12
BA4 5 2.5 2.5 5 3 20

Balok Anak Lantai 2


jenis berat utama banyak total utama berat sengkang total sengkang
BA1 14.202 3 42.606 10.2858 30.8574 73.4634
BA2 18.936 52 984.672 15.2233 791.6116 1776.2836
BA3 18.936 5 94.68 15.2233 76.1165 170.7965
BA4 31.56 1 31.56 18.9363 18.9363 50.4963

Balok Anak Lantai 3


jenis berat banyak total berat sengkang total sengkang
BA1 14.202 5 71.01 10.2858 51.429 122.439
BA2 18.936 48 908.928 15.2233 730.7184 1639.6464
BA3 18.936 5 94.68 15.2233 76.1165 170.7965
BA4 31.56 1 31.56 18.9363 18.9363 50.4963

Ring Balk
Tulangan Sengkang
diameter berat Total berat diameter berat jarak banyak panjang total berat
16 1.578 14.202 kg 8 0.395 100 31 0.84 10.2858
16 1.578 18.936 kg 8 0.395 100 41 0.94 15.2233
16 1.578 18.936 kg 8 0.395 100 41 0.94 15.2233
16 1.578 31.56 kg 8 0.395 100 51 0.94 18.9363

KG/M3 RERATA
136.0433 137.9591
140.9749
121.9975
180.3439

136.0433
121.9975
121.9975
144.2751
total berat
kg
kg
kg
kg
Tulangan utama 1 batang balok induk
jenis panjang panjang lap panjang tump jumlah lap jumlah tump total panjang
B1 6 3 3 7 4 33
B2 4.25 2.125 2.125 6 3 19.125
B3 3 1.5 1.5 4 2 9
B4 4 2 2 5 3 16
B5 5 2.5 2.5 5 3 20

Balok Induk Lantai 2


jenis berat utama banyak total utama berat sengkang total sengkang
B1 73.59 8 588.72 29.45558 235.64464 824.36464
B2 42.64875 62 2644.2225 20.43504 1266.97248 3911.19498
B3 20.07 4 80.28 17.36238 69.44952 149.72952
B4 35.68 64 2283.52 23.14984 1481.58976 3765.10976
B5 44.6 4 178.4 31.0968 124.3872 302.7872

Balok Induk Lantai 3


jenis berat banyak total berat sengkang total sengkang
B1 73.59 8 588.72 29.45558 235.64464 824.36464
B2 42.64875 62 2644.2225 20.43504 1266.97248 3911.19498
B3 20.07 4 80.28 17.36238 69.44952 149.72952
B4 35.68 64 2283.52 23.14984 1481.58976 3765.10976
B5 44.6 4 178.4 31.0968 124.3872 302.7872
Tulangan Sengkang
diameter berat Total berat diameter berat jarak banyak panjang total berat
19 2.23 73.59 kg 10 0.617 200 31 1.54 29.45558
19 2.23 42.64875 kg 10 0.617 200 23 1.44 20.43504
19 2.23 20.07 kg 10 0.617 150 21 1.34 17.36238
19 2.23 35.68 kg 10 0.617 150 28 1.34 23.14984
19 2.23 44.6 kg 10 0.617 150 35 1.44 31.0968

RERATA
89.21695 499.6965
109.5573
92.42563 RERATA BA BI
112.4585 318.8278
96.12292

89.21695
109.5573
92.42563
4183.455
22.52881
total berat
kg
kg
kg
kg
kg
pelat lantai 2 25 140.8175 3520.438 kg
panj tump lap jarak n total panj diameter
x lebar 4.25 2.125 2.125 0.2 42 178.5 8 0.395 70.5075
y panj 4 2 2 0.2 44.5 178 8 0.395 70.31
140.8175

pelat lantai 3 22 140.8175 3097.985 kg


panj tump lap jarak n total panj diameter
x lebar 4.25 2.125 2.125 0.2 42 178.5 8 0.395 70.5075
y panj 4 2 2 0.2 44.5 178 8 0.395 70.31
140.8175

pelat lantai Atap 22 140.8175 3097.985 kg


panj tump lap jarak n total panj diameter
x lebar 4.25 2.125 2.125 0.2 42 178.5 8 0.395 70.5075
y panj 4 2 2 0.2 44.5 178 8 0.395 70.31
140.8175
KG/M3 RERATA
28.34491 47.34169
23.95967
184.4039

TANGGA RERATA
806.048 96.28478
PERHITUNGAN VOLUME PEKERJAAN (BOQ)

PEKERJAAN : PEKERJAAN STRUKTUR


SATKER :
TAHUN ANGGARAN : 2019
LOKASI : Kota Surakarta
VOLUME PEKERJAAN (BOQ) : LANTAI 1
PENAMPANG
No Sketsa Bangunan URAIAN PEKERJAAN QTY VOLUME Ket.
Panjang Lebar Tinggi
1
I. Kolom K1 60x40
Kolom K1 60x40 44 bh 0.60 m 0.40 m 3.70 m 39.07 m3

II. Kolom K4 40x40


Kolom K4 40x40 38 bh 0.4 m 0.4 m 3.7 m 22.50 m3

IV. Kolom Praktis 15x15


Kolom Praktis 15x15 15 bh 0.15 m 0.15 m 3.7 m 1.25 m3

VI. Tangga Beton


Plat Tangga 4 bh 3.3 m 2m 0.15 m 3.96 m3
Anak Tangga 44 bh 2m 0.3 m 0.17 m 2.24 m3
6.20 m3

VII. Bordes Tangga Beton


Bordes Tangga Beton 2 bh 4.25 m 1.7 m 0.15 m 2.17 m3
PERHITUNGAN VOLUME PEKERJAAN (BOQ)

PEKERJAAN : PEKERJAAN STRUKTUR


SATKER :
TAHUN ANGGARAN : 2019
LOKASI : Kota Surakarta
VOLUME PEKERJAAN (BOQ) : LANTAI 2
PENAMPANG
No Sketsa Bangunan URAIAN PEKERJAAN QTY VOLUME Ket.
Panjang Lebar Tinggi
1
I. Kolom K1 60X40
Kolom K1 60X40 44 bh 0.60 m 0.40 m 3.70 m 39.07 m3

II. Kolom K4 40x40


Kolom K4 40x40 36 bh 0.4 m 0.4 m 3.70 m 21.31 m3

III. Kolom Praktis 15x15


Kolom Praktis 15x15 24 bh 0.15 m 0.15 m 3.7 m 2.00 m3

IV. Balok BI 35x55


Balok BI 35x55 48.00 m 0.35 m 0.55 m 9.24 m3

V. Balok B2 30x50
Balok B2 30x50 238 m 0.3 m 0.50 m 35.70 m3

VI. Balok B3 30x45


Balok B3 30x45 12 m 0.3 m 0.45 m 1.62 m3

VII. Balok B4 30x45


Balok B4 30x45 248 m 0.3 m 0.45 m 33.48 m3

VIII. Balok B5 35x45


Balok B5 35x45 20 m 0.35 m 0.45 m 3.15 m3

IX. Balok BA 1 20x30


Balok BA 1 20x30 9m 0.2 m 0.3 m 0.54 m3

X. Balok BA 2 20x35
Balok BA 2 20x35 180 m 0.2 m 0.4 m 12.60 m3
XI. Balok BA 3 20x35
Balok BA 3 20x35 20 m 0.2 m 0.4 m 1.40 m3

XII. Balok BA 4 20x35


Balok BA 4 20x35 4m 0.2 m 0.4 m 0.28 m3

XIII. Plat Lantai tb 12 cm


Plat Lantai tb 12 cm 1035 m2 0.12 m 124.20 m3

XIV. Tangga Beton


Plat Tangga 4 bh 3.3 m 2m 0.15 m 3.96 m3
Anak Tangga 44 bh 0.3 m 2m 0.17 m 4.49 m3
8.45 m3

XV. Bordes Tangga Beton


Bordes Tangga Beton 2 bh 3m 1.7 m 0.15 m 1.53 m3
PERHITUNGAN VOLUME PEKERJAAN (BOQ)

PEKERJAAN : PEKERJAAN STRUKTUR


SATKER :
TAHUN ANGGARAN : 2019
LOKASI : Kota Surakarta
VOLUME PEKERJAAN (BOQ) : LANTAI 3
PENAMPANG
No Sketsa Bangunan URAIAN PEKERJAAN QTY VOLUME Ket.
Panjang Lebar Tinggi
1
I. Kolom K1 60x40
Kolom K1 60x40 44 bh 0.60 m 0.40 m 3.75 m 39.60 m3

II. Kolom K2 40x40


Kolom K2 40x40 7 bh 0.4 m 0.4 m 3.75 m 4.20 m3

III. Kolom Praktis 15x15


Kolom Praktis 15x15 19 bh 0.15 m 0.15 m 3.8 m 1.60 m3

IV. Balok B1 35x55


Balok B1 35x55 48.00 m 0.35 m 0.55 m 9.24 m3

V. Balok B2 30x50
Balok B2 30x50 238 m 0.3 m 0.50 m 35.70 m3

VI. Balok B3 30x45


Balok B3 30x45 12 m 0.3 m 0.45 m 1.62 m3

VII. Balok B4 30x45


Balok B4 30x45 248.00 m 0.30 m 0.45 m 33.48 m3

VIII. Balok B5 35x45


Balok B5 35x45 20 m 0.35 m 0.45 m 3.15 m3

IX. Balok BA 1 20x30


Balok BA 1 20x30 15.00 m 0.20 m 0.30 m 0.90 m3

X. Balok BA 2 20x35
Balok BA 2 20x35 192.00 m 0.20 m 0.35 m 13.44 m3
XI. Balok BA 3 20x35
Balok BA 3 20x35 20.00 m 0.20 m 0.35 m 1.40 m3

XII. Balok BA 4 20x35


Balok BA 4 20x35 5.00 m 0.20 m 0.35 m 0.35 m3

XI. Plat Lantai tb 12 cm


Plat Lantai tb 12 cm 1077.5 m2 0.12 m 129.30 m3

XII. Tangga Beton


Plat Tangga 4 bh 3.3 m 2m 0.15 m 3.96 m3
Anak Tangga 44 bh 1.7 m 2m 0.17 m 25.43 m3
29.39 m3

XIII. Bordes Tangga Beton


Bordes Tangga Beton 2 bh 4.25 m 1.7 m 0.15 m 2.17 m3
PERHITUNGAN VOLUME PEKERJAAN (BOQ)

PEKERJAAN : PEKERJAAN STRUKTUR


SATKER :
TAHUN ANGGARAN : 2019
LOKASI : Kota Surakarta
VOLUME PEKERJAAN (BOQ) : LANTAI ATAP
PENAMPANG
No Sketsa Bangunan URAIAN PEKERJAAN QTY VOLUME Ket.
Panjang Lebar Tinggi
1
I. Ring Balk
Ring Balk 112.00 m 0.35 m 2.00 m 78.40 m3

II. Plat Atap tb 10cm


Plat Atap tb 10cm 168 0.10 m 16.80 m3

III. Genteng Keramik


Genteng Keramik 2 m2 17 m 28.00 m 0.10 m 95.20 m3

IV. Listplank 280 196.00 m1


PERHITUNGAN VOLUME PEKERJAAN (BOQ)

PEKERJA: PEKERJAA PENUTUP ATAP


SATKER :
TAHUN A: 2019
LOKASI : Kota Surakarta
VOLUME : PEKERJAA PENUTUP ATAP
PENAMPANG
NoSketsa Bangunan
URAIAN PEKERJAAN QTY
Panjang Lebar
1 I. Pasangan Genteng Metal
Pasangan Genteng Metal

II. Pasangan Bubungan Genteng Metal


Pasangan Bubungan Genteng Metal 12 m 11.4
RJAAN (BOQ)

PENAMPANG
VOLUME Ket.
Lebar Tinggi

1099.28 m2

m 115.2 m2