00
KETERANGAN PANJANG
1 JALAN 3
2 RATA PER JALAN 120.73
3 PANJANG JALAN 3 LOKASI 362.2
4 ALAT PRINTE ASPAL
Rp. 13,998,743.59
Rp. 13,998,743.59
27,997,487.18
FEE
Rp. 13,998,743.59 8,874,175.00
5,124,568.59
- Rp. - 1,708,189.53
- -
BIAYA KERJA Rp. -
Rp. 13,998,743.59
PAJAK 9.80%
OP TPK 3.00%
TOTAL
SISA TOTAL
A. Kubit 22.57 48.53
B. Kubit 28.14 60.51
rm gembur 1.10
kubit padat 55.79 109.04
perkiraan per ton 2.00
ton aspal 111.58
harga aspal 1,200,000.00 133,893,025.20
harga printe 13,000.00 14,125,800.00
harga gredet - -
bahan bes - -
148,018,825.20
23,981,174.80
LEBAR T. VOLUME TEBAL JML TON T. TON HARGA BELI
JALAN JALAN ASPAL KUBIT ASPAL ASPAL KONTRAK
15%
8%
KEUNTUNGAN DESA
SELISIH
RUGI DESA
362
186
PER METER
PER METER
SELISIH
TOTAL RUGI DESA
NILAI PEKERJAAN
TAMBAH BES
POTONG KEMBALI KEDES
TOTAL RUGI DESA
13.94%
TOTAL BIAYA
PEKERJAAN
63,094,651.43
78,659,517.30
141,754,168.73
16,299,000.00 14,000,000.00
158,053,168.73 Pekerjaan 13,946,831.28 8.11%
13,946,831.28 53,168.72 5.00
21,364,000.00 PAJAK
6,540,000.00 BIAYA TPK
27,904,000.00 TOTAL BIAYA YG KELUAR
18,096,000.00 BERSIH KE DESA
46,000,000.00 TAMPA PAJAK
18,096,000.00 8.30%
8.30% anak muda
340,000,000.00 tuha delapan 8
25,000,000.00 tuha empat 4
7.35% dusun 4
1% aburijal
3,223,119.27 putra
roni
isan
250,000,000.00 manden
7,500,000.00 bagio
24,500,000.00 alim
218,000,000.00 anto
1,172,043.01 ade apasen
475,138.12 ama giring
696,904.89 geri
129,624,309.39 pak edwar
88,375,690.61 pikar
32,000,000.00 647,181.13 pak idris
15,000,000.00 524,861.88 adi lekol
82,624,309.39 97,624,309.39 Patan
82,624,309.39 total
sisa
10,633.74 2,000,000.00 43,000.00
100,000.00 camat
1,857,000.00
600,000.00
800,000.00
400,000.00
400,000.00
200,000.00
200,000.00
100,000.00
100,000.00
50,000.00
50,000.00
50,000.00
50,000.00
100,000.00
100,000.00
50,000.00
100,000.00
50,000.00
50,000.00
50,000.00
100,000.00
3,600,000.00
10,346,831.28
PEKERJAAN PENGASPALAN JALAN DESA DIATAS RABAT BETON
PAJAK 9.80%
OP TPK 3.00%
TOTAL
SISA TOTAL
17%
TOTAL PENGEMBALIAN KE DESA
92 20 X 21
FUTSAL OE 15,000,000.00
8,280.00 600.00
3.00 250,000.00
105.00 60,000.00
6,000,000.00
8.00 100,000.00
2.00 150,000.00
10%
HARGA BELI TOTAL BIAYA
KONTRAK PEKERJAAN
1,300,000.00 63,094,651.43
1,300,000.00 78,659,517.30
141,754,168.73
15,000.00 16,299,000.00
224,900.00 158,053,168.73 Pekerjaan
13,946,831.28
21,364,000.00 PAJAK
6,540,000.00 BIAYA TPK
15% 27,904,000.00 TOTAL BIAYA YG KELUAR
8% 18,096,000.00 BERSIH KE DESA
46,000,000.00 TAMPA PAJAK
1,300,000.00 80,876,659.50
320,000.00 49,996,800.00
130,873,459.50
15,000.00 19,530,000.00
224,900.00 150,403,459.50 Pekerjaan
100,531,986.50
24,591,673.71 PAJAK
7,528,063.38 BIAYA TPK
15% 32,119,737.09 TOTAL BIAYA YG KELUAR
73% 182,523,196.59 BERSIH PEKERJAAN
68,412,249.41 TAMPA KEMALI KE DESA
270,000.00 52,731,000.00
80,000.00 14,880,000.00
46,710.00 67,611,000.00 Pekerjaan
22,389,000.00
8,820,000.00 PAJAK
2,700,000.00 BIAYA TPK
15% 11,520,000.00 TOTAL BIAYA YG KELUAR
88% 79,131,000.00 BERSIH PEKERJAAN
10,869,000.00 TAMPA KEMALI KE DESA
KE DESA
G KELUAR
KE DESA
OE DASAR 241,590,000.00
) 172,000,000.00
69,590,000.00
KETERANGAN PANJANG LEBAR
JALAN 362.2 JALAN
AC-BC YG PAKAI
JALAN WAKMIN. Q. PEMAKAIAN AC-BC
PANJANG JALAN 90 3
ALAT PRINTE ASPAL
3
T. VOLUMETEBAL JML TON T. TON HARGA BELI
JALAN ASPAL KUBIT ASPAL ASPAL KONTRAK
Rp.
Rp.
TOTAL BIAYA
FEE
PEKERJAAN Rp. 8,705,752.00
37,065,600.00 - Rp. -
3,510,000.00 -
56,010,240.00 - Rp. -
5,304,000.00 -
56,092,608.00 - Rp. -
5,311,800.00 -
163,294,248.00 BIAYA KERJA
241,590,000.00
62.2 X 3 M
69,590,000.00 28.81% SISA DARI KONTRAK
27,782,850.00 11.50% PAJAK
7,247,700.00 3.00% BIAYA TPK
35,030,550.00 14.50%
34,559,450.00 14.31% BERSIH KEKAMPUNG
172,000,000.00 71.19% NILAI KONTRAK DIKAMPUNG SUB KON DESA
100.00%
8,705,752.00 5.06% KEUNTUNGAN DARI NILAI OE KONTRAK SUB KON
8,705,752.00 3.60% KEUNTUNGAN DARI NILAI OE KONTRAK DASAR D
SUB KON DESA
plaste
pasir 18.00 18.00
semen 18.00
BIAYA TUKANG
L T. VOLUME mm KG/KUBIT SAK /TRUK
68.40 30,000.00
2,106,720.00
689,700.00
229,900.00
1,827,500.00
76,545.00
467,500.00
2,052,000.00
7,449,865.00
12,000,000.00
4,550,135.00
OE DASAR
POTONGAN
PPN/PPH
FEE KEDALAM
FEE AGEN
ATB ( Aspal Traete Base) dengan tebal minimum 5cm Lapisan permukaan Kontruksi
Asphalt Concrete – Binder Course (AC-BC) dengan ketebalan minimum 3cm biasan digunakan lap
Asphalt Concrete – Wearing Course (AC-WC) dg ketebalan minimum 4cm digunakan sebagai lapi
Jenis Hrs (Hot Roller Sheet) atwu Lasaton 3 dg ketebalan minimum 3 cm digunakan sebagai lap
Sand Sheet dg ketebalan minimum 2 cm biasanya digunakan untuk jalan perumahanbpakiran
26,000,000,000.00
12.00% 3,120,000,000.00
22,880,000,000.00
11.50% 2,631,200,000.00
8.00% 1,830,400,000.00
1.00% 228,800,000.00
18,189,600,000.00
au AC-BC)
kaan Kontruksi
m 3cm biasan digunakan lapisan kedua sebelum wc.
4cm digunakan sebagai lapisan permukaan jalan
cm digunakan sebagai lapisan permukaan konstruksi jalan lalulintas sedang
an perumahanbpakiran
TOTAL KUBIT TON ASPAL TOTAL HARGA
23,142,000.00
241,500,000.00
241,500,000.00
241,500,000.00
322,000,000.00
57,855,000.00
1,127,497,000.00
HARGA
231,420,000.00
1,735,650,000.00
4,049,850,000.00
2,415,000,000.00
8,678,250,000.00
4,830,000,000.00
3,220,000,000.00
25,160,170,000.00 LABA
26,287,667,000.00 (8,098,067,000.00)
HARGA
1,735,650,000.00
231,420,000.00
1,967,070,000.00
2,892,750,000.00
4,347,000,000.00
3,220,000,000.00
10,459,750,000.00
12,426,820,000.00 5,762,780,000.0
443,815.00
3,550,520.00
perhitungan cepat coran beton
- Kebutuhan material beton metode (1Pc : 2Ps : 3Kr) untuk 315 m3 beton
Semen (Pc) = 1/6 x (315 m3) = 52,5 /0,024 = 2187,5 = 2187 sak semen
Pasir (Ps) = 2/6 x (315 m3) = 105 m3
Kerikil (Kr) = 3/6 x (315 m3) =157,5 m3
Air = 215 liter x 315 =67.725 liter
menghitung volume pasangan batu
Gambar contoh pasangan batu yang akan dihitung volumenya
Jadi, total volume pasangan batu yang dibutuhkan berdasarkan perencanaan diatas yaitu sebesar 1300 m3
Demikian pembahasan Kitasipil mengenai cara menghitung volume pasangan batu. Semoga bermanfaat
ini Kitasipil akan menjelaskan cara menghitung volume besi secara sederhana saja, ditujukan khusus untuk pem
Diketahui:
a =0,05 m, b = 1,35 m, c = 1,35 m, d = 1,35 m, e = 1,35 m
Diameter tulangan Ø = 12
Jumlah = 8 batang
Ditanya : total volume besi (kg)??
Jawab :
- Berat Isi Besi
Berat isi besi dapat dihitung dengan tanpa melihat tabel yaitu dengan menggunakan rumus
Berat isi besi = 0,006165 x (diameter tulangan x diameter tulangan)
Berat isi besi = 0,006165 x (12 x 12) = 0,888 kg/m (Bisa juga dengan melihat tabel berat isi besi berdasarkan dia
- Panjang Besi
Panjang Besi = a + b + c + d + e
Panjang Besi = 0,05 + 1,35 + 1,35 + 1,35 + 0,05 = 4,15
Total Panjang Besi = Panjang Besi x Jumlah batang
Jadi, dari hasil perhitungan di atas didapatkan total volume besi sebesar 29,48 kg.
emula. Penjelasan selengkapnya dapat dilihat di bawah ini.
diameternya)
kg harga jumlah
pinang muda rebus 10 5,000.00 50,000.00
ongkos belah 10 1,000.00 10,000.00
ongkos rebus pinang 10 1,000.00 10,000.00
biaya karung muat dan angkut 4 240.00 960.00
total biaya 70,960.00
bersih jadi siap pskai 4 0.40
Nilai jual pinamg rebus 4 23,000.00 92,000.00
21,040.00
keutungan per kg dasar 4 5,260.00
jatuh modal pinang dasar 10 7,096.00