Anda di halaman 1dari 49

OE DASAR 218,724,000.

00
KETERANGAN PANJANG
1 JALAN 3
2 RATA PER JALAN 120.73
3 PANJANG JALAN 3 LOKASI 362.2
4 ALAT PRINTE ASPAL

1 SISA TAMPA PAJAK


2 PAJAK 9.80%
3 OP TPK 3.00%
4 BIAYA BIKIN RAB
5 BIAYA BERSIH AREAL
6 BIAYA SEPTY
7 TOTAL
8 SISA TOTAL
sisa
172,000,000.00 46,724,000.00 34,894,000.00 11,830,000.00
LEBAR T. VOLUME TEBAL JML
JALAN JALAN ASPAL KUBIT

3 1086.6 0.044 47.392


1086.6
tpk pajak
6,561,720.00 5,268,280.00 2.41%
TON T. TON HARGA BELI TOTAL BIAYA
ASPAL ASPAL KONTRAK PEKERJAAN

2.3 109.00 Rp. 1,300,000.00 Rp. 141,702,256.41


Rp. 15,000.00 Rp. 16,299,000.00
158,001,256.41
145,408.85
436,226.55

OE DESA RAB DASAR Rp. 218,724,000.00


HOT MIX 362.2 X 3 M
Rp. 46,724,000.00
Rp. 21,434,952.00
Rp. 6,561,720.00
Rp. 1,000,000.00
Rp. 1,500,000.00
14,000,000.00
Rp. 44,496,672.00
Rp. 2,227,328.00

OE SUBKON Rp. 172,000,000.00

Rp. 13,998,743.59
Rp. 13,998,743.59
27,997,487.18
FEE
Rp. 13,998,743.59 8,874,175.00
5,124,568.59
- Rp. - 1,708,189.53
- -
BIAYA KERJA Rp. -
Rp. 13,998,743.59

21.36% SISA DARI KONTRAK


9.80% PAJAK
3.00% BIAYA TPK
0.46%
0.69%
6.40%
20.34%
1.02% BERSIH KEKAMPUNG

78.64% NILAI KONTRAK DIKAMPUNG SUB KON DESA


100.00%
8.14% KEUNTUNGAN DARI NILAI OE KONTRAK SUB KON DESA
6.40% KEUNTUNGAN DARI NILAI OE KONTRAK DASAR DESA
PEKERJAAN PENGASPALAN JALAN DESA DIATAS RABAT BETON

OE DASAR Rp. 218,000,000.00


NILAI KONTRAK Rp. 172,000,000.00
SISA DANA KONTRAK Rp. 46,000,000.00

KETERANGAN LKS PANJANG


LOKASI RUAS PEKERJAAN JALAN 3
RATA PER JALAN 120.73
A PANJANG JALAN 3 LOKASI 362.2
B PANJANG JALAN 3 LOKASI 362.2

ALAT PRINTE ASPAL

SISA TAMPA PAJAK

PAJAK 9.80%
OP TPK 3.00%
TOTAL
SISA TOTAL
A. Kubit 22.57 48.53
B. Kubit 28.14 60.51
rm gembur 1.10
kubit padat 55.79 109.04
perkiraan per ton 2.00
ton aspal 111.58
harga aspal 1,200,000.00 133,893,025.20
harga printe 13,000.00 14,125,800.00
harga gredet - -
bahan bes - -
148,018,825.20
23,981,174.80
LEBAR T. VOLUME TEBAL JML TON T. TON HARGA BELI
JALAN JALAN ASPAL KUBIT ASPAL ASPAL KONTRAK

1.5 543.3 0.0416 22.57412 2.15 48.534347 1,300,000.00


1.5 543.3 0.0518 28.14294 2.15 60.507321 1,300,000.00
0.0467 50.72 109.04
1,086.60 15,000.00
17% 224,900.00

15%
8%

KEUNTUNGAN DESA

Jl. pemuda lapangan


KEMBALI KE DESA

SELISIH
RUGI DESA

362
186

PER METER
PER METER
SELISIH
TOTAL RUGI DESA
NILAI PEKERJAAN
TAMBAH BES
POTONG KEMBALI KEDES
TOTAL RUGI DESA

13.94%
TOTAL BIAYA
PEKERJAAN

63,094,651.43
78,659,517.30
141,754,168.73
16,299,000.00 14,000,000.00
158,053,168.73 Pekerjaan 13,946,831.28 8.11%
13,946,831.28 53,168.72 5.00

21,364,000.00 PAJAK
6,540,000.00 BIAYA TPK
27,904,000.00 TOTAL BIAYA YG KELUAR
18,096,000.00 BERSIH KE DESA
46,000,000.00 TAMPA PAJAK

18,096,000.00 8.30%
8.30% anak muda
340,000,000.00 tuha delapan 8
25,000,000.00 tuha empat 4
7.35% dusun 4
1% aburijal
3,223,119.27 putra
roni
isan
250,000,000.00 manden
7,500,000.00 bagio
24,500,000.00 alim
218,000,000.00 anto
1,172,043.01 ade apasen
475,138.12 ama giring
696,904.89 geri
129,624,309.39 pak edwar
88,375,690.61 pikar
32,000,000.00 647,181.13 pak idris
15,000,000.00 524,861.88 adi lekol
82,624,309.39 97,624,309.39 Patan
82,624,309.39 total
sisa
10,633.74 2,000,000.00 43,000.00
100,000.00 camat
1,857,000.00

600,000.00
800,000.00
400,000.00
400,000.00
200,000.00
200,000.00
100,000.00
100,000.00
50,000.00
50,000.00
50,000.00
50,000.00
100,000.00
100,000.00
50,000.00
100,000.00
50,000.00
50,000.00
50,000.00
100,000.00
3,600,000.00
10,346,831.28
PEKERJAAN PENGASPALAN JALAN DESA DIATAS RABAT BETON

OE DASAR Rp. 218,000,000.00


NILAI KONTRAK Rp. 172,000,000.00
SISA DANA KONTRAK Rp. 46,000,000.00

KETERANGAN LKS PANJANG


LOKASI RUAS PEKERJAAN JALAN 3
RATA PER JALAN 120.73
A PANJANG JALAN 3 LOKASI 362.2
B PANJANG JALAN 3 LOKASI 362.2

ALAT PRINTE ASPAL

SISA TAMPA PAJAK

PAJAK 9.80%
OP TPK 3.00%
TOTAL
SISA TOTAL

PEKERJAAN PENGASPALAN JALAN DESA DIATAS RABAT BETON

OE DASAR Rp. 250,935,446.00


NILAI KONTRAK Rp. -
SISA DANA KONTRAK Rp. -
KETERANGAN LKS PANJANG
LOKASI RUAS PEKERJAAN JALAN 1
RATA PER JALAN 186.00
PANJANG JALAN LOKASI 186
PANJANG JALAN 1 LOKASI 186

ALAT PRINTE ASPAL

SISA TAMPA PAJAK


A.
B. PAJAK 9.80%
OP TPK 3.00%
TOTAL
SISA TOTAL

PEKERJAAN PENGASPALAN JALAN DESA DIATAS RABAT BETON

OE DASAR Rp. 90,000,000.00


NILAI KONTRAK Rp. -
SISA DANA KONTRAK Rp. -

KETERANGAN LKS PANJANG


LOKASI RUAS PEKERJAAN JALAN 1
RATA PER JALAN 186.00
PANJANG JALAN LOKASI 186
ALAT PRINTE ASPAL

SISA TAMPA PAJAK


A.
B. PAJAK 9.80%
OP TPK 3.00%
TOTAL
SISA TOTAL
LEBAR T. VOLUME TEBAL JML TON T. TON
JALAN JALAN ASPAL KUBIT ASPAL ASPAL

1.5 543.3 0.0416 22.57412 2.15 48.53434725


1.5 543.3 0.0518 28.14294 2.15 60.507321
0.0467 50.72 109.04
1,086.60
17%
LEBAR T. VOLUME TEBAL JML TON T. TON
JALAN JALAN ASPAL KUBIT ASPAL ASPAL

3.5 651 0.0416 27.04905 2.3 62.212815


3.5 651 0.2000 130.2 1.2 156.24
0.1208 157.25 218.45
1,302.00
17%

LEBAR T. VOLUME TEBAL JML Kubit T. KUBIT


JALAN JALAN ASPAL KUBIT BASE BASE

3.5 651 0.2500 162.75 1.2 195.3

17%
TOTAL PENGEMBALIAN KE DESA

92 20 X 21
FUTSAL OE 15,000,000.00
8,280.00 600.00
3.00 250,000.00
105.00 60,000.00
6,000,000.00
8.00 100,000.00
2.00 150,000.00
10%
HARGA BELI TOTAL BIAYA
KONTRAK PEKERJAAN

1,300,000.00 63,094,651.43
1,300,000.00 78,659,517.30
141,754,168.73
15,000.00 16,299,000.00
224,900.00 158,053,168.73 Pekerjaan
13,946,831.28

21,364,000.00 PAJAK
6,540,000.00 BIAYA TPK
15% 27,904,000.00 TOTAL BIAYA YG KELUAR
8% 18,096,000.00 BERSIH KE DESA
46,000,000.00 TAMPA PAJAK

KEUNTUNGAN DESA 18,096,000.00 8.30%


8.30%
HARGA BELI TOTAL BIAYA
KONTRAK PEKERJAAN

1,300,000.00 80,876,659.50
320,000.00 49,996,800.00
130,873,459.50
15,000.00 19,530,000.00
224,900.00 150,403,459.50 Pekerjaan
100,531,986.50

24,591,673.71 PAJAK
7,528,063.38 BIAYA TPK
15% 32,119,737.09 TOTAL BIAYA YG KELUAR
73% 182,523,196.59 BERSIH PEKERJAAN
68,412,249.41 TAMPA KEMALI KE DESA

KEUNTUNGAN DESA 15,755,865.00 6.28%


6.28%
KERUGIAN DESA 52,656,384.41
KERUGIAN DESA 20.98%

HARGA BELI TOTAL BIAYA


KONTRAK PEKERJAAN

270,000.00 52,731,000.00
80,000.00 14,880,000.00
46,710.00 67,611,000.00 Pekerjaan
22,389,000.00

8,820,000.00 PAJAK
2,700,000.00 BIAYA TPK
15% 11,520,000.00 TOTAL BIAYA YG KELUAR
88% 79,131,000.00 BERSIH PEKERJAAN
10,869,000.00 TAMPA KEMALI KE DESA

KEUNTUNGAN DESA 7,000,000.00 7.78%


7.78%
KERUGIAN DESA 3,869,000.00
KERUGIAN DESA 4.30%

TOTAL OE PEKERJAAN 340,935,446.00

AL PENGEMBALIAN KE DESA 22,755,865.00


6.67%

TOTAL KERUGIAN DESA 56,525,384.41


TOTAL KERUGIAN DESA 16.58%

BATU BATU 4,968,000.00


PASIR 750,000.00
TANAH TIMBUN 6,300,000.00
TUKANG 6,000,000.00
BESI 800,000.00
Pipa 300,000.00
Pajak 1,500,000.00
20,618,000.00
G KELUAR
G KELUAR

KE DESA
G KELUAR

KE DESA
OE DASAR 241,590,000.00
) 172,000,000.00
69,590,000.00
KETERANGAN PANJANG LEBAR
JALAN 362.2 JALAN
AC-BC YG PAKAI
JALAN WAKMIN. Q. PEMAKAIAN AC-BC
PANJANG JALAN 90 3
ALAT PRINTE ASPAL

JALAN APASEN Q. PEMAKAYAN AC-NCY


PANJANG JALAN 136 3
ALAT PRINTE ASPAL

JALAN PAK WAN Q PEMAKAIAN AC-BC


PANJANG JALAN 136.2 3
ALAT PRINTE ASPAL
JUMLAH TOTAL BIAYA SEMUA 362.2 3

Pengunaan base -A 90 3.25


ALAT KOMPEK 1
ALAT GREDER 1

SISA TAMPA PAJAK


PAJAK 11.50%
OP TPK 3.00%
TOTAL
SISA TOTAL
catatan

1 Laston Lapis Aus


( Asphalt Concrete- Wearing Course atau AC-WC), TIDAK
2 Laston Lapis Permukaan Antara
( Asphalt Concrete- Binder Course atau AC-BC) ADA
3 Laston Lapis Pondasi,
( Asphalt Concrete- Base atau AC-Base). TIDAK

Aspal beton terdiri atas 3


(tiga) macam lapisan,

3
T. VOLUMETEBAL JML TON T. TON HARGA BELI
JALAN ASPAL KUBIT ASPAL ASPAL KONTRAK

270 0.052 14.04 2.2 30.888 Rp. 1,200,000.00 Rp.


Rp. 13,000.00 Rp.

408 0.052 21.216 2.2 46.6752 Rp. 1,200,000.00 Rp.


Rp. 13,000.00 Rp.

408.6 0.052 21.2472 2.2 46.74384 Rp. 1,200,000.00 Rp.


Rp. 13,000.00 Rp.
1087 0.052 56.503 2.2 124.307 Rp.

292.5 0.07 20.475 1.45 29.69 Rp. 280,000.00 Rp.


Rp. 6,000,000.00 Rp.
Rp. 6,000,000.00 Rp.
Rp.
Rp.

OE DESA RAB D Rp.


HOT MIX 362.2 X 3 M
Rp.
Rp.
Rp.
Rp.
Rp.
OE SUBKON Rp.

Rp.
Rp.
TOTAL BIAYA
FEE
PEKERJAAN Rp. 8,705,752.00

37,065,600.00 - Rp. -
3,510,000.00 -

56,010,240.00 - Rp. -
5,304,000.00 -

56,092,608.00 - Rp. -
5,311,800.00 -
163,294,248.00 BIAYA KERJA

5,733,000.00 25,000.00 Rp. 511,875.00


6,000,000.00 1,000,000.00 Rp. 1,000,000.00
6,000,000.00 1,000,000.00 Rp. 1,000,000.00
17,733,000.00 Rp. 2,511,875.00
181,027,248.00

241,590,000.00
62.2 X 3 M
69,590,000.00 28.81% SISA DARI KONTRAK
27,782,850.00 11.50% PAJAK
7,247,700.00 3.00% BIAYA TPK
35,030,550.00 14.50%
34,559,450.00 14.31% BERSIH KEKAMPUNG
172,000,000.00 71.19% NILAI KONTRAK DIKAMPUNG SUB KON DESA
100.00%
8,705,752.00 5.06% KEUNTUNGAN DARI NILAI OE KONTRAK SUB KON
8,705,752.00 3.60% KEUNTUNGAN DARI NILAI OE KONTRAK DASAR D
SUB KON DESA

KONTRAK SUB KON DESA


KONTRAK DASAR DESA
NO. KETERANGAN HARGA VOLUME KERJA P

1 OE 20,000,000.00 8,000,000.00 12,000,000.00

plaste
pasir 18.00 18.00
semen 18.00

BALOK LARI 18.00


PAKU
KAWAT BETON
BESI BETON POLOS
PASIR
SEMEN

BIAYA TUKANG
L T. VOLUME mm KG/KUBIT SAK /TRUK

3.80 68.40 0.022 1.505 4 6.0 350,000.00


3.80 68.40 0.007 501.6 40 12.54 55,000.00

3.80 68.40 0.002 167.20 40 4.18 55,000.00


3.50
4.86
340.00 16 21.3 86,000.00
0.87 4 0.2 350,000.00
340.00 40 8.50 55,000.00

68.40 30,000.00
2,106,720.00
689,700.00

229,900.00

1,827,500.00
76,545.00
467,500.00

2,052,000.00

7,449,865.00

12,000,000.00
4,550,135.00
OE DASAR
POTONGAN

PPN/PPH
FEE KEDALAM
FEE AGEN

Pengertian lapisan aspal beton Laston AC-WC AC-BC AC-Base


Aspal beton (Asphalt Concrete atau AC)
Laston Lapis Aus ( Asphalt Concrete-Wearing Course atau AC-WC),
Laston Lapis Permukaan Antara (Asphalt Concrete - Binder Course atau AC-BC)
dan Laston Lapis Pondasi (Asphalt Concrete- Base atau AC-Base).

Aspal beton (Asphalt Concrete atau AC)


Asphalt Concrete – Wearing Course (AC-WC)
Asphalt Concrete – Binder Course (AC-BC)
Asphalt Concrete – Base (AC-Base)

Toleransi tebal untuk tiap lapisan campuran beraspal

1. Latasir tidak lebih dari 2,0 mm


2. Lataston Lapis Aus (HRS-WC) tidak lebih 3,0 mm
3. Lataston Lapis Pondasi (HRS-Base) tidak lebih 3,0 mm
4. Laston Lapis Aus (AC-WC) tidak lebih 3,0 mm
5. Laston Lapis Antara (AC-BC) tidak lebih 4,0 mm
6. Laston Lapis Pondasi (AC-Base) tidak lebih 5,0 mm

Tebal Nominal Minimum Campuran Beraspal

1 Latasir kelas B (SS-B). Tebal nominal minimumnya adalah 2 cm


2 Latasir kelas A (SS-A). Tebal nominal minimumnya adalah 1,5 cm

1 Lataston Lapis Pondasi (HRS-Base). Tebal nominal minimumnya adalah 3,5 cm


2 Lataston Lapis Aus (HRS-WC). Tebal nominal minimumnya adalah 3,0 cm

1 Laston Lapis Pondasi (AC-Base). Tebal nominal minimumnya adalah 7,5 cm


2 Laston Lapis Antara (AC-BC). Tebal nominal minimumnya adalah 6 cm.

3 Laston Lapis Aus (AC-WC). Tebal nominal minimumnya adalah 4 cm


Tabel Gradasi Agregat Gabungan Untuk Campuran Beraspal
gradasi agregat lapisan aspal beton Laston AC-WC AC-BC AC-Base

Tebal Nominal Minimum Campuran Beraspal

1 Latasir kelas A (SS-A). Tebal nominal minimumnya adalah 1,5 cm


2 Latasir kelas B (SS-B). Tebal nominal minimumnya adalah 2 cm

1 Laston Lapis Pondasi (AC-Base). Tebal nominal minimumnya adalah 7.5 cm


2 Laston Lapis Antara (AC-BC). Tebal nominal minimumnya adalah 6cm.
3 Laston Lapis Aus (AC-WC). Tebal nominal minimumnya adalah 4 cm

ATB ( Aspal Traete Base) dengan tebal minimum 5cm Lapisan permukaan Kontruksi
Asphalt Concrete – Binder Course (AC-BC) dengan ketebalan minimum 3cm biasan digunakan lap
Asphalt Concrete – Wearing Course (AC-WC) dg ketebalan minimum 4cm digunakan sebagai lapi
Jenis Hrs (Hot Roller Sheet) atwu Lasaton 3 dg ketebalan minimum 3 cm digunakan sebagai lap
Sand Sheet dg ketebalan minimum 2 cm biasanya digunakan untuk jalan perumahanbpakiran
26,000,000,000.00
12.00% 3,120,000,000.00
22,880,000,000.00
11.50% 2,631,200,000.00
8.00% 1,830,400,000.00
1.00% 228,800,000.00
18,189,600,000.00

au AC-BC)

CM METER PANJANG LEBAR

2 0.002 3,500 8.00


3 0.003 3,500 8.00
3 0.003 3,500 8.00
3 0.003 3,500 8.00
4 0.004 3,500 8.00
5 0.005 3,500 8.00

CM METER PANJANG LEBAR

2 0.02 3,500 8.00


1.5 0.15 3,500 8.00

3.5 0.35 3,500 8.00


3.0 0.03 3,500 8.00

7.5 0.75 3,500 8.00


6 0.06 3,500 8.00

4 0.04 3,500 8.00


CM METER PANJANG LEBAR

1.5 0.15 3,500 8


2 0.02 3,500 8

7.5 0.75 3,500 8


5 0.05 3,500 8
4 0.04 3,500 8

kaan Kontruksi
m 3cm biasan digunakan lapisan kedua sebelum wc.
4cm digunakan sebagai lapisan permukaan jalan
cm digunakan sebagai lapisan permukaan konstruksi jalan lalulintas sedang
an perumahanbpakiran
TOTAL KUBIT TON ASPAL TOTAL HARGA

28,000.00 56.00 1.45 81.20 285,000.0


28,000.00 84.00 2.30 193.20 1,250,000.0
28,000.00 84.00 2.30 193.20 1,250,000.0
28,000.00 84.00 2.30 193.20 1,250,000.0
28,000.00 112.00 2.30 257.60 1,250,000.0
28,000.00 140.00 1.45 203.00 285,000.0
560.00 1,121.40 928,333.33

TOTAL KUBIT TON ASPAL TOTAL HARGA

28,000.00 560.00 1.45 812.00 285,000.0


28,000.00 4,200.00 1.45 6,090.00 285,000.0

28,000.00 9,800.00 1.45 14,210.00 285,000.0


28,000.00 840.00 2.30 1,932.00 1,250,000.0

28,000.00 21,000.00 1.45 30,450.00 285,000.0


28,000.00 1,680.00 2.30 3,864.00 1,250,000.0

28,000.00 1,120.00 2.30 2,576.00 1,250,000.0


39,200.00 59,934.00 Err:522
TOTAL KUBIT TON ASPAL TOTAL HARGA

28,000.0 4,200.00 1.45 6,090.00 285,000.0


28,000.0 560.00 1.45 812.00 285,000.0

28,000.0 21,000.00 1.45 30,450.00 95,000.0


28,000.0 1,400.00 2.30 3,220.00 1,350,000.0
28,000.0 1,120.00 2.30 2,576.00 1,250,000.0
HARGA

23,142,000.00
241,500,000.00
241,500,000.00
241,500,000.00
322,000,000.00
57,855,000.00
1,127,497,000.00

HARGA

231,420,000.00
1,735,650,000.00

4,049,850,000.00
2,415,000,000.00

8,678,250,000.00
4,830,000,000.00

3,220,000,000.00
25,160,170,000.00 LABA
26,287,667,000.00 (8,098,067,000.00)

HARGA

1,735,650,000.00
231,420,000.00
1,967,070,000.00

2,892,750,000.00
4,347,000,000.00
3,220,000,000.00
10,459,750,000.00
12,426,820,000.00 5,762,780,000.0
443,815.00
3,550,520.00
perhitungan cepat coran beton

Berdasarkan gambar di atas, Diketahui


- Panjang jalan = 300 m
- Lebar jalan = 3,5 m
- Tebal jalan =0,3 m
- Metode (1Pc : 2Ps : 3Kr)
Ditanya : Volume dan kebutuhan material jalan rabat beton???
Jawaban :
Perhitungan volume jalan rabat beton
- Volume jalan rabat beton = panjang x lebar x tebal
- Volume jalan rabat beton = 300 x 3,5 x 0,3
- Volume jalan rabat beton = 315 m3

Perhitungan kebutuhan material jalan rabat beton


- Kebutuhan material beton metode (1Pc : 2Ps : 3Kr) per m3
Semen (Pc) = 1/6 per m3
Pasir (Ps) = 2/6 per m3
Kerikil (Kr) = 3/6 per m3
Air = 215 liter

- Kebutuhan material beton metode (1Pc : 2Ps : 3Kr) untuk 315 m3 beton
Semen (Pc) = 1/6 x (315 m3) = 52,5 /0,024 = 2187,5 = 2187 sak semen
Pasir (Ps) = 2/6 x (315 m3) = 105 m3
Kerikil (Kr) = 3/6 x (315 m3) =157,5 m3
Air = 215 liter x 315 =67.725 liter
menghitung volume pasangan batu
Gambar contoh pasangan batu yang akan dihitung volumenya

Berdasarkan Gambar Diatas


Diketahui:
A = 30 cm atau 0,3 m
B = 50 cm atau 0,5 m
h1 = 100 cm atau 1 m
h2 = 50 cm atau 0,5 m
jarak = 2000 m
Ditanya : Volume pasangan batu.??
Jawab:
Rumus menghitung volume pasangan batu :
Volume pasangan batu (m3)
= (L1 + L2) x jarak
= [(A+B)/2 x h1) + (B x h2)] x jarak
= [(0,3 + 0,5)/2 x 1) + (0,5 x 0,5)] x 2000
= (0,4 + 0,25) x 2000
= 1300 m3

Jadi, total volume pasangan batu yang dibutuhkan berdasarkan perencanaan diatas yaitu sebesar 1300 m3

Demikian pembahasan Kitasipil mengenai cara menghitung volume pasangan batu. Semoga bermanfaat

ini Kitasipil akan menjelaskan cara menghitung volume besi secara sederhana saja, ditujukan khusus untuk pem

cara menghitung volume pembesian


Gambar contoh bentuk tulangan yang akan dihitung volumenya

Diketahui:
a =0,05 m, b = 1,35 m, c = 1,35 m, d = 1,35 m, e = 1,35 m
Diameter tulangan Ø = 12
Jumlah = 8 batang
Ditanya : total volume besi (kg)??
Jawab :
- Berat Isi Besi
Berat isi besi dapat dihitung dengan tanpa melihat tabel yaitu dengan menggunakan rumus
Berat isi besi = 0,006165 x (diameter tulangan x diameter tulangan)
Berat isi besi = 0,006165 x (12 x 12) = 0,888 kg/m (Bisa juga dengan melihat tabel berat isi besi berdasarkan dia

- Panjang Besi
Panjang Besi = a + b + c + d + e
Panjang Besi = 0,05 + 1,35 + 1,35 + 1,35 + 0,05 = 4,15
Total Panjang Besi = Panjang Besi x Jumlah batang

Total Panjang Besi = 4,15 m x 8 = 33,2 m

- Total Berat Besi


Total Volume Berat Besi (kg) = Total Panjang Besi x Berat isi besi
Total Volume Berat Besi (kg) = 33,2 m x 0,888 kg/m = 29,48 kg

Jadi, dari hasil perhitungan di atas didapatkan total volume besi sebesar 29,48 kg.
emula. Penjelasan selengkapnya dapat dilihat di bawah ini.

diameternya)
kg harga jumlah
pinang muda rebus 10 5,000.00 50,000.00
ongkos belah 10 1,000.00 10,000.00
ongkos rebus pinang 10 1,000.00 10,000.00
biaya karung muat dan angkut 4 240.00 960.00
total biaya 70,960.00
bersih jadi siap pskai 4 0.40
Nilai jual pinamg rebus 4 23,000.00 92,000.00
21,040.00
keutungan per kg dasar 4 5,260.00
jatuh modal pinang dasar 10 7,096.00

harga pinang kering 14,500.00 35% 5,075.00


harga pinang boh labu 9,425.00
harga pinang dasar masih kulit 7,425.00