PEKERJAAN ARSITEKTUR
2 A PEKERJAAN LANTAI ( Elv - 3,20 ) Rp 98,672,224.10
B PEKRJAAN LANTAI DASAR ( ElV ± 0,00 ) Rp 84,496,448.60
C PEKERJAAN LANATAI ATAP ( Elv + 3,20 ) Rp 43,425,907.22
SUB TOTAL PEKERJAAN ARSITEKTUR Rp 226,594,579.92
PEKERJAAN ME
3 A PEKERJAAN ELEKTRIKAL Rp 19,945,000.00
B PEKRJAAN TATA UDARA Rp 6,335,000.00
C PEKERJAAN PLUMBING Rp 25,344,000.00
D PEKERJAAN IJIN SAMBUNGAN BARU Rp 6,850,000.00
SUB TOTAL PEKERJAAN ME Rp 58,474,000.00
Terbilang : # Enam Ratus Lima Juta Enam Ratus Sembilan Puluh Ribu Rupiah #
91%
Rp 554,105,000.00
RENCANA ANGGARAN BIAYA ( RAB ) STRUKTUR
PROYEK : PEMBANGUNAN RUMAH DAGO VALLEY
SUB PROYEK : BANGUNAN TYPE - 1
LOKASI : BANDUNG - JAWA BARAT
JUMLAH HARGA
NO URAIAN PEKERJAA SAT VOL
UPAH BAHAN
A PEKERJAAN PERSIAPAN
1 Pembersi m² 160.00 Rp 2,400,000.00 Rp -
2 Penguku m¹ 56.00 Rp 1,232,000.00 Rp 2,177,280.00
3 Direksi m² 43.20 Rp 1,857,600.00 Rp 6,480,000.00
4 Pagar pengaman proyek m¹ Rp - Rp -
5 Air kerja bln Rp - Rp -
6 Listrik Kerja bln Rp - Rp -
0 4 PEKERJAAN KOLOM
1 Pekerjaan Beton K - 225 m³ 1.81 Rp 90,500.00 Rp 1,327,182.50
2 Pekerjaan Bekesting m² 53.04 Rp 1,326,000.00 Rp 3,536,176.80
3 Pekerjaan Pembesian
Ø - 6 mm kg 44.16 Rp 529,920.00 Rp 427,027.20
Ø - 8 mm kg 180.05 Rp 2,160,600.00 Rp 1,741,083.50
D - 13 mm kg 216.61 Rp 2,599,320.00 Rp 2,094,618.70
0 5 PEKERJAAN TANGGA - 1
1 Pekerjaan Beton K - 225 m³ 1.46 Rp 73,000.00 Rp 1,070,545.00
2 Pekerjaan Bekesting m² 13.27 Rp 331,750.00 Rp 884,710.90
3 Pekerjaan Pembesian
Ø - 8 mm kg 32.27 Rp 387,240.00 Rp 312,050.90
Ø - 10 mm kg 44.14 Rp 529,680.00 Rp 426,833.80
D - 13 mm kg 140.59 Rp 1,687,080.00 Rp 1,359,505.30
0 6 PEKERJAAN TANGGA - 2
1 Pekerjaan Beton K - 225 m³ 1.29 Rp 64,500.00 Rp 945,892.50
2 Pekerjaan Bekesting m² 12.50 Rp 312,500.00 Rp 833,375.00
3 Pekerjaan Pembesian
Ø - 8 mm kg 37.81 Rp 453,720.00 Rp 365,622.70
Ø - 10 mm kg 47.15 Rp 565,800.00 Rp 455,940.50
D - 13 mm kg 119.04 Rp 1,428,480.00 Rp 1,151,116.80
JUMLAH HARGA
NO URAIAN PEKERJAA SAT VOL
UPAH BAHAN
C PEKERJAAN BETON LANATAI ATAS ( Elv ± 0.00 )
0 1 PEKERJAA KOLOM
1 Pekerjaan Beton K - 225 m³ 1.35 Rp 67,500.00 Rp 989,887.50
2 Pekerjaan Bekesting m² 36.75 Rp 918,750.00 Rp 2,450,122.50
3 Pekerjaan Pembesian
Ø - 6 mm kg 4.01 Rp 48,120.00 Rp 38,776.70
Ø - 8 mm kg 110.57 Rp 1,326,840.00 Rp 1,069,211.90
Ø - 10 mm kg 9.25 Rp 111,000.00 Rp 89,447.50
D - 13 mm kg 260.05 Rp 3,120,600.00 Rp 2,514,683.50
0 2 PEKERJAAN BALOK
1 Pekerjaan Beton K - 225 m³ 1.74 Rp 87,000.00 Rp 1,275,855.00
2 Pekerjaan Bekesting m² 21.47 Rp 536,750.00 Rp 1,431,404.90
3 Pekerjaan Pembesian
Ø - 8 mm kg 154.68 Rp 1,856,160.00 Rp 1,495,755.60
Ø - 10 mm kg 28.51 Rp 342,120.00 Rp 275,691.70
Ø - 12 mm kg 384.22 Rp 4,610,640.00 Rp 3,715,407.40
D - 13 mm kg 19.29 Rp 231,480.00 Rp 186,534.30
Rp 2,400,000.00
Rp 3,409,280.00
Rp 8,337,600.00
Rp -
Rp -
Rp -
Rp 14,146,880.00
Rp 16,472,397.60
Rp 347,600.00
Rp 7,317,000.00
Rp 1,008,350.00
Rp 246,000.00
Rp 2,044,282.50
Rp 3,191,949.40
Rp 4,090,429.20
Rp 2,891,644.80
Rp 7,966,542.10
Rp 3,939,747.50
Rp 287,843.80
Rp 3,600,903.90
Rp 1,452,235.80
Rp 759,530.00
Rp 1,417,682.50
Rp 4,862,176.80
Rp 956,947.20
Rp 3,901,683.50
Rp 4,693,938.70
Rp 1,143,545.00
Rp 1,216,460.90
Rp 699,290.90
Rp 956,513.80
Rp 3,046,585.30
Rp 1,010,392.50
Rp 1,145,875.00
Rp 819,342.70
Rp 1,021,740.50
Rp 2,579,596.80
Rp 85,088,228.70
JUMLAH HARGA
Rp 1,057,387.50
Rp 3,368,872.50
Rp 86,896.70
Rp 2,396,051.90
Rp 200,447.50
Rp 5,635,283.50
Rp 1,362,855.00
Rp 1,968,154.90
Rp 3,351,915.60
Rp 617,811.70
Rp 8,326,047.40
Rp 418,014.30
Rp 4,699,500.00
Rp 5,062,017.40
Rp 12,698,403.30
Rp 51,249,659.20
Rp 1,370,687.50
Rp 2,675,847.30
Rp 2,628,571.00
Rp 5,624,448.50
Rp 1,208,319.20
Rp 2,052,115.00
Rp 2,781,267.80
Rp 6,322,222.50
Rp 768,390.00
Rp 1,607,891.80
Rp 1,058,796.20
Rp 2,767,259.00
Rp 30,865,816
Rp 181,350,583.70
RENCANA ANGGARAN BIAYA ( RAB ) ARSITEKTUR
PROYEK : PEMBANGUNAN RUMAH DAGO VALLEY
SUB PROYEK : BANGUNAN TIPE - 1 -15000 -10000
LOKASI : BANDUNG - JAWA BARAT 7500
-2500
JUMLAH HARGA
NO URAIAN PEKERJAAN SAT VOL JUMLAH HARGA
UPAH BAHAN
A PEKERJAAN LANTAI DASAR
0 1 PEKERJAAN PASANGAN & FINISHING DINDING
1 Pasangan Dinding ½ Bata merah m² 90.24 Rp 2,030,400.00 Rp 8,154,988.80 Rp 10,185,388.80
2 Pasangan Kolom Peraktis 4Ø8, Ø6-20 cm beton sitemix m¹ 22.40 Rp 268,800.00 Rp 378,470.40 Rp 647,270.40
3 Plesteran pada Dinding Bata merah m² 180.48 Rp 2,707,200.00 Rp 4,095,091.20 Rp 6,802,291.20
4 Acian pada Dinding Bata merah m² 180.48 Rp 2,256,000.00 Rp 758,016.00 Rp 3,014,016.00
5 Pek Pengecatan Dinding luar dan dalam m² 180.48 Rp 1,443,840.00 Rp 3,338,880.00 Rp 4,782,720.00
0 5 PEKERJAAN SANITARY
1 KM/WC - 1
a Closet duduk Ex-Tc CW4211/sw420JP bh 1.00 Rp 100,000.00 Rp 2,600,000.00 Rp 2,700,000.00
b Wastafel Ex-Tc LW665CJT1 bh 1.00 Rp 75,000.00 Rp 500,000.00 Rp 575,000.00
c Tissu Holder Ex-Tc TS116R bh 2.00 Rp 22,000.00 Rp 440,000.00 Rp 462,000.00
d Floor Drain Ex-TC TX1 BV 1N bh 1.00 Rp 21,000.00 Rp 200,000.00 Rp 221,000.00
e Jet Washer Ex-Tc THX20NBW bh 1.00 Rp 11,000.00 Rp 200,000.00 Rp 211,000.00
f Towel Bar ( gatungan handuk ) Ex-Tc TX 10 AEZ bh 1.00 Rp 25,000.00 Rp 200,000.00 Rp 225,000.00
g Meja Wastafel bh 1.00 Rp 50,000.00 Rp 450,000.00 Rp 500,000.00
h Cermin bh 1.00 Rp 15,000.00 Rp 250,000.00 Rp 265,000.00
l Screen Tray bh 1.00 Rp 11,000.00 Rp 250,000.00 Rp 261,000.00
j Kran Shower bh 1.00 Rp 45,000.00 Rp 385,000.00 Rp 430,000.00
2 KM/WC - 2
a Closet Jongkok bh 1.00 Rp 50,000.00 Rp 225,000.00 Rp 275,000.00
b Kran bh 1.00 Rp 11,000.00 Rp 200,000.00 Rp 211,000.00
c Jet Washer Ex-Tc THX20NBW bh 1.00 Rp 11,000.00 Rp 200,000.00 Rp 211,000.00
d Floor Drain Ex-Tc Tx1 BV 1 N bh 1.00 Rp 21,000.00 Rp 200,000.00 Rp 221,000.00
0 5 PEKERJAAN SANITARY
1 KM/WC - 1
a Closet duduk Ex-Tc CW4211/sw420JP bh 1.00 Rp 100,000.00 Rp 2,600,000.00 Rp 2,700,000.00
b Wastafel Ex-Tc LW665CJT1 bh 1.00 Rp 75,000.00 Rp 500,000.00 Rp 575,000.00
c Tissu Holder Ex-Tc TS116R bh 2.00 Rp 22,000.00 Rp 440,000.00 Rp 462,000.00
d Floor Drain Ex-TC TX1 BV 1N bh 1.00 Rp 21,000.00 Rp 200,000.00 Rp 221,000.00
e Jet Washer Ex-Tc THX20NBW bh 2.00 Rp 22,000.00 Rp 400,000.00 Rp 422,000.00
f Towel Bar ( gatungan handuk ) Ex-Tc TX 10 AEZ bh 1.00 Rp 25,000.00 Rp 200,000.00 Rp 225,000.00
g Meja Wastafel bh 1.00 Rp 50,000.00 Rp 450,000.00 Rp 500,000.00
h Cermin bh 1.00 Rp 15,000.00 Rp 250,000.00 Rp 265,000.00
l Screen Tray bh 1.00 Rp 11,000.00 Rp 250,000.00 Rp 261,000.00
j Kran Shower bh 1.00 Rp 45,000.00 Rp 385,000.00 Rp 430,000.00
0 4 PEKERJAAN ATAP
1 Pekerjaan Rangka Atap Baja ringan + Aluminium Foil double m² 43.09 Rp - Rp 7,971,650.00 Rp 7,971,650.00
2 Pekerjaan Penutup Atap Genteng Keramik Ex-Roman type Milenio m² 43.09 Rp 646,350.00 Rp 7,109,850.00 Rp 7,756,200.00
3 Pekerjaan Nok Atap m¹ 6.45 Rp 496,650.00 Rp 741,750.00 Rp 1,238,400.00
4 Pekerjaan Listplank + Finishing Cat m¹ 26.26 Rp 787,800.00 Rp 919,100.00 Rp 1,706,900.00
0 5 PEKERJAAN LAIN-LAIN
1 Pekerjaan Grill Kayu
- Tampak - B / AS - 2'/C-D m² 8.27 Rp 206,750.00 Rp 2,619,654.82 Rp 2,826,404.82
2 Pekerjaan Pemasangan Kaca
- Tampak - B Uk 10x270 cm unit 1.00 Rp 17,500.00 Rp 65,000.00 Rp 82,500.00
3 Pekerjaan Pemasangan Batu Alam tampak Depan m² 11.31 Rp 282,750.00 Rp 2,827,500.00 Rp 3,110,250.00
4 Pekerjaan Pemasangan Batu Alam + Coating area Tampak ( A ) m² 14.50 Rp 362,500.00 Rp 3,625,000.00 Rp 3,987,500.00
I ELEKTRIKAL
A LANTAI DASAR
- TV Outlet Bh 1 45,000
- Telepon Bh 1 35,000
- Saklar Tunggal Bh 5 30,000
- Saklar Ganda Bh 5 35,000
- Instalasi TV Outlet
- Coaxial RG-6 Titik 1 255,000
- Instalasi Telepon
- ITC 2 x 2 x 0,6 mm2 in PVC HI Conduit dia. 20 mm Titik 1 210,000
B LANTAI ATAS
C PENANGKAL PETIR
- Menggunakan Tipe Konvensional (Splitzen) lengkap Titik 3 1,500,000
dengan Bak Kontrol, Kabel BC atau kabel penghantar
lainnya lengkap dengan accessories dan material bantu
lainnya.
II TATA UDARA
A LANTAI DASAR
1 Pipa Refrigerant
Pengadaan, Pemasangan dan Pengetesan Pipa Refrigerant
dari bahan Cooper lengkap dengan peralatan bantu,
accessories dan semua material sehingga dapat berfungsi
dengan baik dan benar sesuai dengan gambar dan spesifikasi
teknis.
2 Pipa Drain
Pengadaan, Pemasangan dan Pengetesan Pipa Drain dari
bahan PVC Klas AW lengkap dengan isolasi, peralatan
bantu, accessories dan semua material sehingga dapat
berfungsi dengan baik dan benar sesuai dengan Gambar
dan Spesifikasi Teknis.
- diameter 20 mm m 6 30,000
II TATA UDARA
B LANTAI ATAS
1 Pipa Refrigerant
Pengadaan, Pemasangan dan Pengetesan Pipa Refrigerant
dari bahan Cooper lengkap dengan peralatan bantu,
accessories dan semua material sehingga dapat berfungsi
dengan baik dan benar sesuai dengan gambar dan spesifikasi
teknis.
2 Pipa Drain
Pengadaan, Pemasangan dan Pengetesan Pipa Drain dari
bahan PVC Klas AW lengkap dengan isolasi, peralatan
bantu, accessories dan semua material sehingga dapat
berfungsi dengan baik dan benar sesuai dengan Gambar
dan Spesifikasi Teknis.
- diameter 20 mm m 18 30,000
III PLUMBING
Harga satuan pekerjaan sudah termasuk pengadaan,
pemasangan dan pengetesan material serta material bantu
yang diperlukan sehingga pekerjaan tersebut dinyatakan
tercapai dengan baik. Pekerjaan harus dilaksanakan sesuai
dengan gambar dan spesifikasi teknis.
A PERALATAN UTAMA
B INSTALASI PEMIPAAN
- diameter 32 mm m 8 107,000
- diameter 25 mm m 32 67,500
- diameter 20 mm m 16 52,000
- diameter 15 mm m 28 52,000
- diameter 80 mm m 12 47,500
- diameter 65 mm m 16 35,000
- diameter 50 mm m 8 25,000
- diameter 40 mm m 3 22,500
- diameter 32 mm m 9 17,500
- Vent Cup, diameter 25 mm Bh 3 15,000
- diameter 80 mm m 38 47,500
- Roof Drain, diameter 80 mm Bh 5 75,000
7 Accessories
- Gate Valve, diameter 25 mm Bh 1 135,000
- Gate Valve, diameter 15 mm Bh 4 125,000
TOTAL
510,000
325,000
605,000
175,000
1,000,000
45,000
35,000
150,000
175,000
90,000
3,000,000
1,200,000
255,000
210,000
750,000
Rp 8,525,000
510,000
650,000
660,000
175,000
250,000
180,000
105,000
90,000
3,250,000
300,000
750,000
4,500,000
Rp 11,420,000
8,525,000
11,420,000
Rp 19,945,000
By Tenant
350,000
350,000
1,050,000
180,000
110,000
70,000
Rp 2,110,000
By Tenant
By Tenant
By Tenant
350,000
1,050,000
1,050,000
1,050,000
540,000
150,000
35,000
Rp 4,225,000
2,110,000
4,225,000
Rp 6,335,000
5,500,000
2,000,000
856,000
2,160,000
832,000
1,456,000
750,000
570,000
560,000
200,000
67,500
750,000
2,550,000
750,000
157,500
45,000
75,000
1,805,000
375,000
500,000
135,000
500,000
2,750,000
Rp 25,344,000
3,900,000
2,500,000
450,000
Rp 6,850,000
Rp 58,474,000
TIME SCHEDULE
PROYEK : PEMBANGUNAN RUMAH DAGO VALLEY
SUB PROYEK : BANGUNAN TYPE - 1