RENCANA ANGGARAN BIAYA

PERENCANAAN RUMAH TIPE 36 / 60


URAIAN PEKERJAAN JUMLAH

REKAPITULASI

PEKERJAAN LANTAI 1
I PEKERJAAN PERSIAPAN LT 1 Rp 1.030.000,00
II PEKERJAAN TANAH & PONDASI BATU KALI Rp 5.454.811,60
III PEKERJAAN PONDASI DAN BETON
A PEKERJAAN STRUKTUR BETON Rp 11.748.704,36
IV PEKERJAAN PASANGAN Rp 20.698.813,79
V PEKERJAAN PLAFON Rp 3.808.083,33
VI PEKERJAAN ATAP Rp 7.130.350,00
VII PEKERJAAN LANTAI Rp 5.287.977,60
VIII PEKERJAAN KUSEN, PINTU DAN JENDELA Rp 6.175.000,00
IX PEKERJAAN INSTALASI AIR BERSIH LT 1 Rp 395.900,00
X PEKERJAAN INSTALASI AIR KOTOR LT 1 Rp 1.617.000,00
XI PEKERJAAN INSTALASI LISTRIK LT 1 Rp 2.060.300,00
XII PEKERJAAN SANITAIR LT 1 Rp 855.000,00
XIII PEKERJAAN FINISHING LT 1 Rp 2.459.015,00

Sub Total Pekerjaan Lantai 1 Rp 68.720.955,68


Dibulatkan Rp 68.700.000,00
PER M2 ( 36M2) Rp 1.908.333,33
TERBILANG : "Enam Puluh Delapan Juta Tujuh Ratus Ribu Rupiah "

KETERANGAN
HARGA TIDAK TERMASUK
1. box kwh
2. tanaman shurb dan dll
3. MCB
4. Sumur galian atau bor
5, jetpum
6, rab di atas hanya menyediakan jalur air bersih dan air kotor untuk di
sambungkan ke sumur dan pembuangan
RENCANA ANGGARAN BIAYA
PERENCANAAN RUMAH TIPE 36 / 60

HARGA SAT. JML. HARGA


NO JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
1/volume 1= a+Z
I PEKERJAAN PERSIAPAN LT 1

1 Pengukuran Dan Pembersihan 60,00 m2 5.000,00 300.000,00


2 Pek.Bouwplank 48,00 m' 10.000,00 480.000,00
3 Air dan Listrik Kerja 1,00 ls 250.000,00 250.000,00
JUMLAH I 1.030.000,00
II PEKERJAAN TANAH & PONDASI BATU KALI
1 Pek.Galian Tanah pondasi batu kali 12,06 m3 30.000,00 361.875,00
3 Pek.Galian pondasi Pondasi Telapak m3 40.000,00 -
4 Pek.Urugan Pasir Pondasi Telapak m3 -
a.Pasir m3
b,Upah m3
6 Pek.Urugan kembali 7,20 m3 45.000,00 324.000,00
7 Pek.Pondasi Batu Kali 1 : 4 10,86 m3 4.768.936,60
a.Batu Pecah 10,91 m3 178.571,43 1.948.309,15
b,Pasir 3,47 m3 33.800,00 117.421,20
c.Semen 32,57 sak 53.000,00 1.726.143,75
d,Upah 10,86 m3 90.000,00 977.062,50

JUMLAH II 5.454.811,60
III PEKERJAAN PONDASI DAN BETON
B. PEKERJAAN STRUKTUR BETON
1 Pek.Sloof Uk. 15 x 20 cm 1,50 m3 3.756.928,57
a. Besi 16 Untuk Pedestal -
b. Besi 10 Untuk Cakar ayam 16,00 Btg 82.000,00 1.312.000,00
c. Besi 6 Untuk Sengkang Pedestal 12,00 Btg 26.000,00 312.000,00
e. Pasir Beton 0,93 m3 228.571,43 212.571,43
f. Splits 2//3 1,08 m3 228.571,43 246.857,14
g. Semen 50Kg 7,50 sak 53.000,00 397.500,00
h. Papan Kayu L : 20cm Tebal 2cm + kaso 24,25 Btg 32.000,00 776.000,00
i.Alat Bantu 1,00 Ls 50.000,00 50.000,00
j.Upah 1,50 OH 300.000,00 450.000,00

3 Pek.Ring Balok 15 x 20 1,68 m3 3.846.520,00


a. Besi 16 Untuk tulangan Btg - -
b. Besi 10 Untuk tulangan 20,00 Btg 82.000,00 1.640.000,00
c. Besi 6 Untuk Sengkang 13,50 Btg 26.000,00 351.000,00
d. Pasir Beton 0,97 m3 228.571,43 222.720,00
e. Splits 2//3 1,09 m3 228.571,43 249.600,00
f. Semen 50Kg 8,40 sak 53.000,00 445.200,00
h. Papan Kayu L : 20cm Tebal 2cm + kaso 12,00 Btg 32.000,00 384.000,00
g.Alat Bantu 1,00 Ls 50.000,00 50.000,00
h.Upah 1,68 OH 300.000,00 504.000,00

Hal. 1
RENCANA ANGGARAN BIAYA
PERENCANAAN RUMAH TIPE 36 / 60

HARGA SAT. JML. HARGA


NO JENIS PEKERJAAN VOLUME SAT
Rp. Rp.

5 Pek.Kolom (KP) Uk. 15 x 15cm 1,19 m3 3.132.364,36


a. Besi 16 Untuk tulangan Btg 155.000,00 -
b. Besi 10 Untuk tulangan 17,00 Btg 82.000,00 1.394.000,00
c. Besi 6 Untuk Sengkang 12,00 Btg 26.000,00 312.000,00
d. Pasir Beton 0,81 m3 228.571,43 184.299,43
e. Splits 2//3 0,89 m3 228.571,43 203.271,43
f. Semen 50Kg 7,11 sak 53.000,00 377.068,50
h. Papan Kayu L : 20cm Tebal 2cm + kaso 8,00 Btg 32.000,00 256.000,00
g.Alat Bantu 1,00 Ls 50.000,00 50.000,00
h.Upah 1,19 OH 300.000,00 355.725,00
6 Pek. Rabat Beton 1,36 m3 1.012.891,43
a. Besi 16 Untuk tulangan Btg 155.000,00 -
b. Besi 10 Untuk tulangan Btg 82.000,00 -
c. Besi 6 Untuk Sengkang Btg 26.000,00 -
d. Pasir Beton 0,82 m3 228.571,43 186.514,29
e. Splits 2//3 0,88 m3 228.571,43 202.057,14
f. Semen 50Kg 5,44 sak 53.000,00 288.320,00
h. Bekisting 1,00 m2 32.000,00 32.000,00
g.Alat Bantu 1,00 Ls 32.000,00 32.000,00
h.Upah 1,36 Ls 200.000,00 272.000,00
3 Pek.Talang Beton + Kanopi 0,90 m3 2.316.328,57
a. Besi 16 Untuk tulangan Btg - -
b. Besi 10 Untuk tulangan 9,00 Btg 82.000,00 738.000,00
c. Besi 6 Untuk Sengkang Btg 26.000,00 -
d. Pasir Beton 0,59 m3 228.571,43 133.714,29
e. Splits 2//3 0,65 m3 228.571,43 148.114,29
f. Semen 50Kg 4,50 sak 53.000,00 238.500,00
g. Bondex 1,00 Lbr 756.000,00 756.000,00
h.Alat Bantu 1,00 Ls 32.000,00 32.000,00
i.Upah 0,90 Ls 300.000,00 270.000,00
3 Pek.Meja Kompor 0,36 m3 1.314.131,43
a. Besi 16 Untuk tulangan Btg - -
b. Besi 10 Untuk tulangan 6,00 Btg 82.000,00 492.000,00
c. Besi 6 Untuk Sengkang Btg 26.000,00 -
d. Pasir Beton 0,23 m3 228.571,43 53.485,71
e. Splits 2//3 0,26 m3 228.571,43 59.245,71
f. Semen 50Kg 1,80 sak 53.000,00 95.400,00
h. Bekisting 3,80 m2 120.000,00 456.000,00
g.Alat Bantu 1,00 Ls 50.000,00 50.000,00
h.Upah 0,36 Ls 300.000,00 108.000,00

JUMLAH 1 S/D 6 LT 1 11.748.704,36


IV PEKERJAAN PASANGAN

Hal. 2
RENCANA ANGGARAN BIAYA
PERENCANAAN RUMAH TIPE 36 / 60

HARGA SAT. JML. HARGA


NO JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
1 Pas. dinding Bata Merah 1 Pc : 4 Ps 155,12 m2 11.668.480,93
a. Bata Hebel 14,39 m3 550.000,00 7.916.030,93
b. Semen MU Perekat Hebel, M-380 13,00 sak 50.000,00 650.000,00
d. Upah Pasang 155,12 m2 20.000,00 3.102.450,00

2 Plesteran Dan Acian dinding 1 Pc : 4 Ps 191,47 m2 36.500,00 8.850.332,86


b. Semen 32,55 sak 53.000,00 1.725.099,65
c. Pasir 4,79 m3 228.571,43 1.094.085,71
d. Upah Pasang 191,47 m2 31.500,00 6.031.147,50

3 Pas. Glass Blok area talang beton 264,15 m2 36.500,00 180.000,00


a. Glass Blok 5,00 BH 26.000,00 130.000,00
c. Upah Pasang 1,00 OH 50.000,00 50.000,00
JUMLAH IV 20.698.813,79
V PEKERJAAN PLAFON
Pek. Plafond Gypsum t = 9 mm + Rangka 48,00 m2 3.808.083,33
1
Hollow
a. Gypsum 120 x 240 t = 9 mm ex DN 16,67 lbr 56.000,00 933.333,33
b. Besi hollo 40 x 40 36,00 btg 18.000,00 648.000,00
c. Besi hollo 20 x 40 43,20 btg 15.000,00 648.000,00
d. Paku 0,65 kg 15.000,00 9.750,00
e. Compoun 0,60 sak 65.000,00 39.000,00
f. Kain Kasa 2,00 roll 5.000,00 10.000,00
g. List Gypsum 10cm 40,00 m 5.000,00 200.000,00
h. skrup Gypsum 1,50 dus 80.000,00 120.000,00
i. Upah 48,00 m2 25.000,00 1.200.000,00

JUMLAH V 3.808.083,33
VI PEKERJAAN ATAP
1 Pek. Rangka Atap Baja Ringan 44,60 m2 159.873,32 7.130.350,00
a. CNP 0,75 18,00 btg 97.500,00 1.755.000,00
b. Reng 26,00 btg 32.000,00 832.000,00
c. atap Genteng Metal 2 x 4 71,36 lmbr 35.000,00 2.497.600,00
d. Paku 0,25 kg 15.000,00 3.750,00
e. skrup 1,00 bks 180.000,00 180.000,00
f. listplank 12,00 btg 40.000,00 480.000,00
g. nok asbes 6,00 btg 38.500,00 231.000,00
h. skrup asbes 60,00 pcs 600,00 36.000,00
i. Upah 44,60 m2 25.000,00 1.115.000,00

JUMLAH V 7.130.350,00
VII PEKERJAAN LANTAI
1 Pas. Lantai Keramik Mulia 1 Uk. 40/40 33,52 m2 3.297.984,91
a. Lantai keramik 40 x 40 33,52 m2 50.000,00 1.676.000,00

Hal. 3
RENCANA ANGGARAN BIAYA
PERENCANAAN RUMAH TIPE 36 / 60

HARGA SAT. JML. HARGA


NO JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
b. Semen 6,70 sak 53.000,00 355.312,00
c. Pasir 1,68 m3 228.571,43 383.085,71
d. Semen Warna 5,70 Kg 8.000,00 45.587,20
e. Upah 33,52 m2 25.000,00 838.000,00

2 Pas.lantai km/wc Keramik Uk. 25 x 25 cm 2,30 m' 202.252,11


a. Lantai keramik 25 x 25 2,48 m2 50.000,00 123.750,00
b. Semen 0,28 sak 53.000,00 14.596,20
c. Pasir 0,02 m3 228.571,43 5.245,71
d. Semen Warna 0,16 Kg 8.000,00 1.285,20
e. Upah 2,30 m2 25.000,00 57.375,00

Pas.dinding km/wc Keramik Uk. 25 x 50 cm 10,60 m2 1.051.580,57


3
a. Lantai keramik 25 x 50 10,60 m2 65.000,00 689.000,00
b. Semen 1,27 sak 53.000,00 67.416,00
c. Pasir 0,11 m3 228.571,43 24.228,57
d. Semen Warna 0,74 Kg 8.000,00 5.936,00
e. Upah 10,60 m2 25.000,00 265.000,00

4 Pas.Granit Meja Kompor dan Dinding 6,00 m2 122.693,33 736.160,00


a. Lantai keramik dan dinding 6,00 m2 90.000,00 540.000,00
b. Semen 0,72 sak 53.000,00 38.160,00
d. Semen Warna 1,00 Kg 8.000,00 8.000,00
e. Upah 6,00 m2 25.000,00 150.000,00

JUMLAH VII 5.287.977,60


VIII PEKERJAAN KUSEN, PINTU DAN
JENDELA
1 Pas. Kusen P1 1,00 unit 1.180.000,00
a, Kusen Pintu 1,00 Unit 200.000,00 200.000,00
b. Loster 1,00 Unit 40.000,00 40.000,00
c, Daun Pintu double multi plak 1,00 Unit 500.000,00 500.000,00
d, Handle Pintu 1,00 pcs 75.000,00 75.000,00
e, Engsel 2,00 pcs 20.000,00 40.000,00
f, Slot Kunci 1,00 pcs 25.000,00 25.000,00
g, finising Cat Duco 1,00 Unit 300.000,00 300.000,00
2 Pas. Kusen P2 1,00 unit 2.100.000,00
a, Kusen Pintu 2,00 Unit 220.000,00 440.000,00
b. Loster 2,00 Unit 40.000,00 80.000,00
c, Daun Pintu double multi plak 2,00 Unit 350.000,00 700.000,00
d, Handle Pintu 2,00 pcs 75.000,00 150.000,00
e, Engsel 4,00 pcs 20.000,00 80.000,00

Hal. 4
RENCANA ANGGARAN BIAYA
PERENCANAAN RUMAH TIPE 36 / 60

HARGA SAT. JML. HARGA


NO JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
f, Slot Kunci 2,00 pcs 25.000,00 50.000,00
g, finising Cat Duco 2,00 Unit 300.000,00 600.000,00
3 Pas. Kusen PVC 1,00 unit 300.000,00
a, pintu Pvc set 1,00 Unit 300.000,00 300.000,00
3 Pas. Kusen J1 1,00 unit 1.570.000,00
a, Kusen Jendela 1,00 Unit 300.000,00 300.000,00
b. Loster 1,00 Unit 80.000,00 80.000,00
c. Daun Jendela+ kaca 2,00 Unit 300.000,00 600.000,00
d, Handle Jendela 2,00 pcs 30.000,00 60.000,00
e, Engsel 4,00 pcs 20.000,00 80.000,00
f, Slot Kunci 2,00 pcs 25.000,00 50.000,00
g, Hak Angin 2,00 pcs 25.000,00 50.000,00
h, finising Cat Duco 1,00 Unit 400.000,00 400.000,00
4 Pas. Kusen J2 1,00 unit 1.025.000,00
a, Kusen Jendela 2,00 Unit 170.000,00 340.000,00
b. Loster 1,00 Unit 40.000,00 40.000,00
c. Daun Jendela 1,00 Unit 300.000,00 300.000,00
d, Handle Jendela 1,00 pcs 30.000,00 30.000,00
e, Engsel 2,00 pcs 20.000,00 40.000,00
f, Slot Kunci 1,00 pcs 25.000,00 25.000,00
g, Hak Angin 1,00 pcs 25.000,00 25.000,00
h, finising Cat Duco 1,00 Unit 250.000,00 250.000,00

JUMLAH VII 6.175.000,00


IX PEKERJAAN INSTALASI AIR BERSIH LT 1

1 PVC 1/2" ex Wavin AW 20,00 m' 8.710,00 174.200,00


2 PVC 1 1/2" ex Wavin AW 20,00 m' 9.750,00 195.000,00
3 Stop Kran 1 1/2" 1,00 bh 26.700,00 26.700,00
5 Sumur bor m' By Daveloper

JUMLAH VIII 395.900,00


X PEKERJAAN INSTALASI AIR KOTOR LT 1

1 Pas PVC 4" ex Wavin AW 22,00 m' 23.000,00 506.000,00


2 Pas PVC 3" ex Wavin AW 26,00 m' 19.000,00 494.000,00
3 Pas PVC 1 1/4" Wavin AW 12,00 m' 9.750,00 117.000,00
4 Septictank 1,00 Bh 500.000,00 500.000,00

JUMLAH IX 1.617.000,00

Hal. 5
RENCANA ANGGARAN BIAYA
PERENCANAAN RUMAH TIPE 36 / 60

HARGA SAT. JML. HARGA


NO JENIS PEKERJAAN VOLUME SAT
Rp. Rp.
XI PEKERJAAN INSTALASI LISTRIK LT 1

1 Instalasi lampu penerangan 6,00 ttk 115.000,00 690.000,00


2 Instalasi Stop Kontak 4,00 ttk 115.000,00 460.000,00
3 Saklar Seri ex Panasonic 3,00 bh 35.000,00 105.000,00
4 Saklar Tunggal ex Panasonic 1,00 bh 29.000,00 29.000,00
5 Stop Kontak ex Panasonic 4,00 bh 27.200,00 108.800,00
6 Pas. Lampu Douwnlight 5,00 bh 92.500,00 462.500,00
7 Pas. Lampu led strip 1,00 set 205.000,00 205.000,00
JUMLAH X 2.060.300,00
XII PEKERJAAN SANITAIR LT 1

1 Pas. Kitchen Zinc 1,00 bh 200.000,00


a, Kitchen Sink 1,00 bh 150.000,00 150.000,00
b, Upah 1,00 Ls 50.000,00 50.000,00
2 Pas. Kran Angsa 1,00 bh 67.000,00
a, Kran Angsa 1,00 bh 55.000,00 55.000,00
b, Upah 1,00 Ls 12.000,00 12.000,00
3 Pas. Kran 2,00 bh 102.000,00
a, Kran 2,00 bh 45.000,00 90.000,00
b, Upah 2,00 Ls 12.000,00 12.000,00
4 Pas. Kloset Duduk 1,00 bh 280.000,00
a, kloset Jogkok 1,00 bh 180.000,00 180.000,00
b, Upah 1,00 Ls 100.000,00 100.000,00
5 Pas. Floor Drain 2,00 bh 82.000,00
a, Floor Drain 2,00 bh 35.000,00 70.000,00
b, Upah 2,00 Ls 12.000,00 12.000,00
6 Pas. Roof DRAIN 2,00 bh 124.000,00
a, Roof Drain 2,00 bh 56.000,00 112.000,00
b, Upah 2,00 Ls 12.000,00 12.000,00

JUMLAH XI 855.000,00
XIII PEKERJAAN FINISHING LT 1

1 Cat dinding dalam ex setara Mowilex 191,47 m2 25.000,00 1.969.415,00


a, cat dalam dan luar nippon q luc 5kg 16,25 gln 50.500,00 820.625,00
b, Upah 191,47 m2 5.000,00 957.325,00
c, Alat Bantu 191,47 Ls 1.000,00 191.465,00
2 Cat plafond ex Catylax 48,00 m2 25.000,00 489.600,00
a, cat plafond 4,03 gln 50.000,00 201.600,00
b, Upah 48,00 m2 5.000,00 240.000,00
c, Alat Bantu 48,00 Ls 1.000,00 48.000,00
JUMLAH XII 2.459.015,00

Hal. 6
RENCANA ANGGARAN BIAYA
PERENCANAAN RUMAH TIPE 36 / 60

HARGA SAT. JML. HARGA


NO NAMA BAHAN VOLUME SAT
Rp. Rp.
I KEBUTUHAN MATERIAL UNTUK unit tipe 30 / 60

1 Pasir Beton 14,41 m3 228.571,43 3.294.008,00


3 Spitz 2/3 4,85 m3 228.571,43 1.109.145,71
4 Semen 50kg 108,84 sak 53.000,00 5.768.716,10
5 hebel 14,39 m3 550.000,00 7.916.030,93
6 Semen M-380 13,00 sak 50.000,00 650.000,00
7 Paku 5,7,10, 15,00 Kg 25.000,00 375.000,00
8 Semen Warna Lemkra 7,60 kg 8.000,00 60.808,40
9 Kawat 10,00 kg 28.000,00 280.000,00
10 Benang 3,00 roll 7.000,00 21.000,00
11 Kaso 5/7 48,05 Btg 8.000,00 384.400,00
12 Papan Cor 48,05 Btg 13.000,00 624.650,00
13 Bamboe 30,00 Btg 8.000,00 240.000,00
14 Besi Hollo 4 / 4 36,00 Btg 18.000,00 648.000,00
15 Besi Hollo 4 / 2 43,20 Btg 15.000,00 648.000,00
19 besi 6 37,50 Btg 26.000,00 975.000,00
20 Besi 10 68,00 Btg 61.500,00 4.182.000,00
21 Besi 12 - Btg 86.500,00 -
22 Besi 16 - Btg 155.000,00 -
23 atap Gneteng Metal 71,36 bh 35.000,00 2.497.600,00
24 Nok Genteng Metal 6,00 btg 38.500,00 231.000,00
25 Rangka Baja Ringan CNP 0,75 18,00 Btg 97.500,00 1.755.000,00
26 Reng 0,4 ,0 ,35 26,00 btg 32.000,00 832.000,00
27 Papan Gypsum 16,67 lbr 65.000,00 1.083.333,33
28 List Gypsum 40,00 m 5.000,00 200.000,00
29 Kain Kasa 2,00 roll 5.000,00 10.000,00
30 Compount 0,60 kg 65.000,00 39.000,00
31 skrup gypsum dan skrup baja 2,50 dus 360.000,00 900.000,00
32 lantai keramik 40 x 40 33,52 m2 50.000,00 1.676.000,00
33 lantai keramik 25 x 25 unpolish 2,30 m2 50.000,00 114.750,00
34 Dinding keramik 25 x 50 10,60 m2 65.000,00 689.000,00
35 Granite Meja Dapur 6,00 m2 90.000,00 540.000,00
36 PVC 1/2" ex Wavin AW 20,00 btg 8.710,00 174.200,00
37 PVC 1 1/2" ex Wavin AW 20,00 btg 9.750,00 195.000,00
38 Stop Kran 1 1/2" 1,00 btg 26.700,00 26.700,00
39 Pas PVC 1 1/4" Wavin AW 12,00 btg 9.750,00 117.000,00
40 Pas PVC 3" ex Wavin AW 26,00 btg 19.000,00 494.000,00
41 Pas PVC 4" ex Wavin AW 22,00 btg 23.000,00 506.000,00
42 Kable eterna 2,20 roll 475.000,00 1.045.000,00
43 Pipa 1/2" wavin eletrikal 15,00 btg' 13.500,00 202.500,00
44 lampu led strip / tl 6,00 bh 28.500,00 171.000,00
45 wadah lampu downlight 5,00 bh 32.000,00 160.000,00
46 Lampu Phillip Smarthome wifi 5,00 bh 125.000,00 625.000,00
47 Saklar single 1,00 bh 29.000,00 29.000,00
48 Saklar Double 3,00 bh 35.000,00 105.000,00
49 Stop Kontak 4,00 bh 27.200,00 108.800,00
50 Kusen Pintu 3,00 bh 200.000,00 600.000,00
51 Kusen Jendela tipe 1 2,00 bh 200.000,00 400.000,00

Hal. 1
RENCANA ANGGARAN BIAYA
PERENCANAAN RUMAH TIPE 36 / 60

HARGA SAT. JML. HARGA


NO NAMA BAHAN VOLUME SAT
Rp. Rp.
52 Kusen Jendela tipe 2 1,00 bh 350.000,00 350.000,00
53 Daun Pintu tipe 1 1,00 bh 500.000,00 500.000,00
54 Daun Pintu tipe 2 2,00 bh 350.000,00 700.000,00
55 Daun Jendela 4,00 bh 300.000,00 1.200.000,00
56 Loster Kayu 6,00 bh 40.000,00 240.000,00
57 Pintu PVC 1,00 bh 250.000,00 250.000,00
Cat Duco,amplasgritt 180 s/d
800,dempul,epoxy,cat surfar,thinner, nippe 2000 7,00 set 253.000,00 1.771.000,00
58 auto clear
59 Kitchen Sink 1,00 ls 150.000,00 150.000,00
60 Kran ANGSA 1,00 ls 55.000,00 55.000,00
61 Kran 2,00 ls 45.000,00 90.000,00
62 Closet Jongkok 1,00 ls 180.000,00 180.000,00
63 Floor Drain 2,00 ls 35.000,00 70.000,00
64 Roof Drain Drain 2,00 ls 56.000,00 112.000,00
65 Cat Dinding 16,25 ls 50.500,00 820.625,00
66 Cat Plafond 4,03 ls 50.000,00 201.600,00
67 Alat Bantu Tukang 1,00 Lot 619.075,32 619.076,32

JUMLAH I 50.012.943,80
UPAH PEKERJAAN 36,00 M2 -
1, Galian,Pondasi dan sloof + sanitary 1,00 lot 2.112.937,50
2, Pasang Bata Hebel Dan Kolom 1,00 lot 3.458.175,00
3, Ring balok, talang beton, Kanopi 1,00 lot 774.000,00
4, Galian,Pondasi dan sloof 1,00 lot 117.421,20
5, Ring balok, talang beton, Kanopi +
1,00 lot 824.000,00
Glassblok
6. Plester Aci 1,00 lot 6.031.147,50
7. plafond 1,00 lot 1.200.000,00
8. Atap 1,00 lot 1.115.000,00
9, Lantai Keramik 1,00 lot 1.310.375,00
10, Lampu 10,00 lot 350.000,00
11, Kusen Pintu Dan Jendela 1,00 lot 700.000,00

12, Finising dinding,plafond dan pintu jendela 4,00 lot 140.000,00


13, Sanitary k. mandi dan dapur 1,00 lot 174.000,00
14. Rabat Beton + Meja Kompor 1,00 lot 380.000,00

Total Biaya Upah 18.687.056,20


36/M2 519.084,89

TOTAL 36,00 M2 519.084,89 18.687.056,20

TOTAL BIAYA MATERIAL DAN UPAH 68.700.000,00