JUMLAH
NO. URAIAN PEKERJAAN
(Rp)
1.00 2.00 3.00
Pek.Pengelasan
Pengelasan Konsol = 4,860.00
Pengelasan Stifener = 3,240.00
8,100.00
3. PEKERJAAN DINDING
3.1. Pek.Pasangan Batu-Bata
a. Pek. Pas. Batu; Tbl.1 Bata; Spesi 1Pc:3Psr ;(Batu Nol) 67.65 0.50 33.83
b. Pek. Pas. Batu; Tbl.1/2 Bata; Spesi 1Pc:4Psr 22.35
Dik : Total Panjang Batu Bata = 7.63
Tinggi Pas. Batu Bata = 3.15
Luas Area = 24.03 M²
FAKTOR PENGURANG
1 Kusen Pintu Jalusi 90 = 1.00 set
Dik : Panjang = 2.10
Lebar = 0.8
Luasan = 1.68 M²
c. Pek. Pas. Batu Ekspose ` 20.44
Dik : Total Panjang Batu Bata = 7.69
Tinggi Pas. Batu Bata = 3.15
Luas Area = 24.22 M²
FAKTOR PENGURANG
1 Kusen Pintu Jalusi 180 = 1.00 set
Dik : Panjang = 2.10
Lebar = 1.8
Luasan = 3.78 M²
3.2. Pekerjaan Plesteran
a. Pek. Plesteran; Spesi 1Pc:2Psr (Batu Nol) 67.65
b. Pek. Plesteran; Spesi 1Pc:3Psr 23.32
b.1. Area Kamar Mandi
Panjang = 4.67
Tinggi = 2.10
Luasan = 9.81
Pengurang = Pintu
= 1.40
Tot.Luasan Plester = 8.41
b.2. Area Wastafel
Panjang = 3.89
Tinggi = 3.60
Luasan = 14.00
Panjang = 1.04
Tinggi = 2.60
Luasan = 2.70
Pengurang = Pintu
= 1.80
Tot.Luasan Plester = 14.91
c. Pek. Plesteran Ciprat; Spesi 1Pc:2Psr 22.35
d. Pek. Plesteran; Spesi 1Pc:5Psr (Tebal 20 mm) 39.60
3.3. Pekerjaan Acian
a. Area Gudang; H=3,60 Mtr 23.32
b. Area Kamar Mandi 8.41
c. Area Wastafel 14.91
d. Pek. Acian Lantai 39.60
4. PEKERJAAN PELAPIS LANTAI DAN DINDING
4.1. Pekerjaan Coating
a. Coating Batu Ekspose 20.44
b. Coating Dinding Camprot 39.60
4.2. Pekerjaan Pelapis Dinding
- Area Kamar Mandi (Keramik Uk.40x40 cm) 6.77
Dik : Panjang Dinding = 4.51
Tinggi Dinding = 1.5
JUMLAH/ PANJANG LEBAR TINGGI LUASAN KUBIKASI
NO. URAIAN PEKERJAAN
UNIT ( mtr') ( mtr') ( mtr') METER² METER³
1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00
Luasan = 6.765
- Area Wastafel (Keramik Uk.40x40 cm) 1.56
Dik : Panjang Dinding = 1.04
Tinggi Dinding = 1.5
Luasan = 1.56
4.3. Pekerjaan Pelapis Lantai
- Area Kamar Mandi (Keramik Uk.20x20 cm) 1.55
Dik : Panjang Dinding = 1.05
Lebar Dinding = 1.48
Luasan = 1.554
- Area Wastafel (Keramik Uk.60x60 cm) 1.54
Dik : Panjang Dinding = 1.04
Lebar Dinding = 1.48
Luasan = 1.5392
5. PEKERJAAN KAYU KUSEN PINTU, JENDELA, JALUSI, KACA DAN PENGGANTUNG
Dik : 0.25 Inchi = 0.64 cm
0.50 Inchi = 1.27 cm
1.00 Inchi = 2.54 cm
2.00 Inchi = 5.08 cm
6.00 Inchi = 15.24 cm
40.94 Inci = 104.00 cm
Vol. Kusen Per 1 mtr = 100.00 cm
= (2 ichi x 6 inchi)x 100 cm
= (5.08cm x 15.24cm )x 100 cm
= 7,741.92 cm³
= 0.00774192 m³
FAK. BUANG POTONG = 5%
FAK. BUANG POTONG = 0.000387096
TOT. KUBIKASI KUSEN = 0.0081 m³
6 PEKERJAAN SANITASI
6.1. Pekerjaan Septick Tank
Dik : Panjang = 2.00 M'
Lebar = 1.50 M'
Tinggi = 2.00 M'
Tebal Plat = 0.10 M'
Jarak besi = 0.15 M'
Besi dia. = 8.00 mm
1 Pek. Beton Plat
- Pek. Mall Plat = 3.00 M²
- Pek. Pembesian Plat
Pjng Vertikal = 1.50 m'
Jlh Besi Vertikal = 14.33 set
Tot.Pjng Vertikal = 21.50 m'
Pjng Horizontal = 2.00 m'
Jlh Besi Vertikal = 11.00 set
Tot.Pjng Vertikal = 22.00 m'
TOT.PJG BESI = 43.50 m'
BERAT BESI = 17.16 Kg
- Pek. Pengecoran = 0.30 m³
2 Pek. Lantai Beton
- Pek. Pengecoran = 0.30 m³
3 Pek. Dinding
- Pek.Pas.Batu-Bata; Tbl.1 Batu
Luas = 12.60 M²
4 Pek. Plesteran
- Pek.Pas.Batu-Bata; Tbl.1 Batu
Luas = 12.60 M²
8. PEKERJAAN PLAFOND
8.1. Area Kamar Mandi
a. Pek.Rangka Plaond 1.05 1.48 1.55
b. Pek.Plafond Gypsum; Tbl.9mm 1.05 1.48 1.55
JUMLAH/ PANJANG LEBAR TINGGI LUASAN KUBIKASI
NO. URAIAN PEKERJAAN
UNIT ( mtr') ( mtr') ( mtr') METER² METER³
1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00
8.2. Area Wastafel
a. Pek.Rangka Plaond 1.04 1.48 1.54
b. Pek.Plafond Gypsum; Tbl.9mm 1.04 1.48 1.54
9 PEKERJAAN PENGECATAN
9.1. Pekerjaan Cat Air
- Plafond Kamar Mandi 1.55
- Plafond Area Wastafel 1.54
- Pedestal 12.00
- Dinding Kamar Mandi 8.41
- Area Gudang 23.32
9.2. Pekerjaan Cat Besi
- WF 250x125x6x9 = 16.32 16.32
- Plat Tbl.2 mm Uk.0,35x0,45 = 1.89 1.89
- Siffener = 3.24 3.24
- Besi Bulat 6" = 2.83 2.83
- Besi Hollow Area Tangga
- Hollow 100x100 mm = 2.40 2.40
- Hollow 50x50 mm = 7.20 7.20
- Hollow 40x40 mm = 1.58 1.58
- Hollow 20x40 mm = 0.23 0.23
- Besi Hollow Area Kanopy = 21.68 21.68
9.3. Pekerjaan Cat Vernish
- Kusen 5.18
- Daun Pintu 9.92
- Tangga 11.74
- Jalusi 2.60
KG
9.00
KG
9.00
956.54
228.08
33.54
595.77
KG
9.00
88.19
75.69
120.10
KG
9.00
144.75
#VALUE!
463.32
514.56
KG
9.00
190.17
#VALUE!
KG
9.00
KG
9.00
KG
9.00
VOLUME PEKERJAAN
Proyek : PEKERJAAN PEMBANGUNAN 1 UNIT VILLA
Wilayah : SIEMPAT RUBEI
Tahun : 2018
3. PEKERJAAN DINDING
3.1. Pekerjaan Pasangan Batu-Bata
a. Pek. Pas. Batu; Tbl.1/2 Bata; Spesi 1Pc:4Psr 91.10
Dik : Luas Area di Kamar 1 = 26.31 M²
Luas Area di Kamar 2 = 27.47 M²
Luas Area di Rg.Keluarga = 11.02 M²
Luas Area di Kamar 3 = 26.31 M²
b. Pek. Pas. Batu Ekspose 116.00
Dik : Luas Area di Kamar 1 = 32.09 M²
Luas Area di Kamar 3 = 32.09 M²
Area Belakang = 51.82 M²
3.2. Pekerjaan Plesteran
a. Pek. Plesteran Ciprat; Spesi 1Pc:2Psr 105.50
b. Pekerjaan Plesteran 99.10
3.3. Pekerjaan Acian 99.10
6 PEKERJAAN SANITASI
6.1. Pekerjaan Pipa
1. Pipa Buangan dia.4"; type AW 1.00 17.55
Dik : Panjang = 0.4ke arah kloset
0.6di bawah lantai
12.5 area luar
13.5 m'
2. Pipa Buangan dia.2"; type AW (ke drainase lingkungan) 1.00 6.70
Dik : Panjang = 3.4 ke arah drainase
1.75
5.15 m'
3. Pipa Air; dia. 1/2"; type AW (tdk termaksud in-let ke Gedung) 1.00 16.71
Dik : Panjang = 12.85 ke bawah
12.85 m'
8. PEKERJAAN PLAFOND
8.1.Pekerjaan Rangka Plafond 125.62
8.2.Pekerjaan Plafond Gypsum 125.62
9. PEKERJAAN PENGECATAN
9.1. Pekerjaan Cat Air
- Plafond 125.62
- Dinding Kamar Mandi 5.24
- Dinding Kamar Tidur (Sisi Dalam) 99.10
- Listplank GRC 13.82
9.2. Pekerjaan Cat Besi
- WF 300x150x6,5x9 = 2.72 2.72
- Plat Tbl.2 mm Uk.0,35x0,45 = 0.32 0.32
- Siffener = 0.54 0.54
- Besi Bulat 6" = 2.83 2.83
- Besi Hollow Area Tangga
- Hollow 40x40 mm = 3.47 3.47
- Hollow 20x40 mm = 1.19 1.19
P.P. 6.2. 1 m' Pagar sementara dari seng gelombang tinggi 2 meter
6.2.1. Bahan
- Kayu Laut/Dolken 1.250 Btg x Rp 20,212.50 = Rp 25,265.63
- Semen Portland 2.500 Kg x Rp 1,522.50 = Rp 3,806.25
- Seng Gelombang 1.200 Lbr x Rp 90,300.00 = Rp 108,360.00
- Pasir beton 0.005 M3 x Rp 262,500.00 = Rp 1,312.50
- Koral beton 0.009 M3 x Rp 325,500.00 = Rp 2,929.50
- Kayu 5/7 0.012 M3 x Rp 4,312,875.00 = Rp 51,754.50
- Paku biasa 2" - 5" 0.060 Kg x Rp 15,246.00 = Rp 914.76
- Meni besi 0.450 Kg x Rp 47,250.00 = Rp 21,262.50
Jumlah (1) = Rp 215,605.64
6.2.2. Tenaga
- Tukang kayu 0.200 Oh x Rp 110,000.00 = Rp 22,000.00
- Pekerja 0.400 Oh x Rp 70,000.00 = Rp 28,000.00
- Kepala tukang 0.020 Oh x Rp 120,000.00 = Rp 2,400.00
- Mandor 0.020 Oh x Rp 90,000.00 = Rp 1,800.00
Jumlah (2) = Rp 54,200.00
Jumlah (1) + (2) = Rp 269,805.64
P.P. 6.3 1 M' Pagar sementara dari kawat duri tinggi 1,8 meter
6.3.1. Bahan
- Kayu Laut/Dolken 1.000 Btg x Rp 20,212.50 = Rp 20,212.50
- Semen Portland 2.000 Kg x Rp 1,522.50 = Rp 3,045.00
- Kawat duri 1.625 Kg x Rp 4,231.50 = Rp 6,876.19
- Pasir beton 0.005 M3 x Rp 262,500.00 = Rp 1,312.50
- Koral beton 0.009 M3 x Rp 325,500.00 = Rp 2,929.50
- Paku biasa 2" - 5" 0.060 Kg x Rp 15,246.00 = Rp 914.76
Jumlah (1) = Rp 35,290.45
6.3.2. Tenaga
- Tukang kayu 0.200 Oh x Rp 110,000.00 = Rp 22,000.00
- Pekerja 0.400 Oh x Rp 70,000.00 = Rp 28,000.00
- Kepala tukang 0.020 Oh x Rp 120,000.00 = Rp 2,400.00
- Mandor 0.020 Oh x Rp 90,000.00 = Rp 1,800.00
Jumlah (2) = Rp 54,200.00
Jumlah (1) + (2) = Rp 89,490.45
PT 2.9. 1 m³
6.9.1. Tenaga
- Pekerja 0.1920 Oh x Rp. 70,000.00 = Rp. 13,440.00
- Mandor 0.0192 Oh x Rp. 90,000.00 = Rp. 1,728.00
Jumlah = Rp. 15,168.00
PT 2.10. 1 m³ Urugan kembali
6.10.1. Tenaga
- Pekerja 0.5000 Oh x Rp. 70,000.00 = Rp. 35,000.00
- Mandor 0.0500 Oh x Rp. 90,000.00 = Rp. 4,500.00
Jumlah = Rp. 39,500.00
Pemadatan tanah
PT 2.10. 1 m³
6.10.1.1. Bahan
- Pasir urug 1.2000 M³ x Rp. 225,750.00 = Rp. 270,900.00
Jumlah (1) = Rp. 270,900.00
6.10.1.2. Tenaga
- Pekerja Peninggian Sirtu 0.3000 Oh x Rp. 70,000.00 = Rp. 21,000.00
- Mandor 0.0150 Oh x Rp. 90,000.00 = Rp. 1,350.00
Jumlah (2) = Rp. 22,350.00
Jumlah (1) + (2) = Rp. 293,250.00
P.B. 6.45. 1 M' Membuat kolom penguat beton bertulang (11 x 11) cm
6.45.1.
- Kayu Sembarang Keras 0.0020 M³ x Rp. 4,312,875.00 = Rp. 8,625.75
- Paku biasa 2" - 5 " 0.0100 Kg x Rp. 17,850.00 = Rp. 178.50
- Besi beton polos 3.0000 Kg x Rp. 10,246.83 = Rp. 30,740.49
- Kawat beton 0.4500 Kg x Rp. 23,656.50 = Rp. 10,645.43
- Semen portland 4.0000 Kg x Rp. 1,522.50 = Rp. 6,090.00
- Pasir beton 0.0060 M³ x Rp. 262,500.00 = Rp. 1,575.00
- Koral beton 0.0090 M³ x Rp. 357,000.00 = Rp. 3,213.00
Jumlah (1) = Rp. 61,068.16
6.45.2. Tenaga
- Pekerja 0.0600 Oh x Rp. 70,000.00 = Rp. 4,200.00
- Tukang batu 0.0200 Oh x Rp. 110,000.00 = Rp. 2,200.00
- Tukang kayu 0.0200 Oh x Rp. 110,000.00 = Rp. 2,200.00
- Tukang besi 0.0200 Oh x Rp. 110,000.00 = Rp. 2,200.00
- Kepala tukang 0.0060 Oh x Rp. 120,000.00 = Rp. 720.00
- Mandor 0.0030 Oh x Rp. 90,000.00 = Rp. 270.00
Jumlah (2) = Rp. 11,790.00
Jumlah (1) + (2) = Rp. 72,858.16
P.B. 6.46. 1 M' Membuat ring balok beton bertulang (10 x 15) cm
6.46.1.
- Kayu Sembarang Keras 0.0030 M³ x Rp. 4,312,875.00 = Rp. 12,938.63
- Paku biasa 2" - 5 " 0.0200 Kg x Rp. 17,850.00 = Rp. 357.00
- Besi beton polos 3.6000 Kg x Rp. 10,246.83 = Rp. 36,888.59
- Kawat beton 0.0500 Kg x Rp. 23,656.50 = Rp. 1,182.83
- Semen portland 5.5000 Kg x Rp. 1,522.50 = Rp. 8,373.75
ANALISA BIAYA KONSTRUKSI
PEKERJAAN BETON
- Pasir beton 0.0090 M³ x Rp. 262,500.00 = Rp. 2,362.50
- Koral beton 0.0150 M³ x Rp. 357,000.00 = Rp. 5,355.00
Jumlah (1) = Rp. 67,458.29
6.46.2. Tenaga
- Pekerja 0.1000 Oh x Rp. 70,000.00 = Rp. 7,000.00
- Tukang batu 0.0330 Oh x Rp. 110,000.00 = Rp. 3,630.00
- Tukang kayu 0.0330 Oh x Rp. 110,000.00 = Rp. 3,630.00
- Tukang besi 0.0330 Oh x Rp. 110,000.00 = Rp. 3,630.00
- Kepala tukang 0.0100 Oh x Rp. 120,000.00 = Rp. 1,200.00
- Mandor 0.0050 Oh x Rp. 90,000.00 = Rp. 450.00
Jumlah (2) = Rp. 19,540.00
Jumlah (1) + (2) = Rp. 86,998.29
P.B. 6.5. 1 M' Pembuatan Tiang Pancang uk. 25x25 cm; Beton Bertulang
6.5.1. Bahan
- Pasir Urug Darat 0.0160 m³ x Rp. 210,000.00 = Rp. 3,360.00
- Pasir Beton 0.0800 m³ x Rp. 262,500.00 = Rp. 21,000.00
- Koral Beton 0.1250 m³ x Rp. 357,000.00 = Rp. 44,625.00
- Semen Portland 49.0000 Kg x Rp. 1,522.50 = Rp. 74,602.50
- Besi Beton 34.0000 Kg x Rp. 15,697.50 = Rp. 533,715.00
- Kawat Beton 0.7000 Kg x Rp. 23,656.50 = Rp. 16,559.55
- Kayu Kaso 5/7 0.0270 m³ x Rp. 4,312,875.00 = Rp. 116,447.63
- Paku 0.1280 Kg x Rp. 17,850.00 = Rp. 2,284.80
- Minyak Bekisting 0.0900 Lt x Rp. 26,250.00 = Rp. 2,362.50
Jumlah (1) = Rp. 814,956.98
6.5.2. Tenaga
- Pekerja 0.8800 Oh x Rp. 70,000.00 = Rp. 61,600.00
- Tukang Batu 0.5000 Oh x Rp. 110,000.00 = Rp. 55,000.00
- Kepala Tukang 0.0500 Oh x Rp. 120,000.00 = Rp. 6,000.00
- Mandor 0.0400 Oh x Rp. 90,000.00 = Rp. 3,600.00
Jumlah (2) = Rp. 126,200.00
Jumlah (1) + (2) = Rp. 941,156.98
P.B. Hit.01 1 M' Pembuatan Tiang Pancang uk. 25x25 cm; Beton Bertulang + Galian
Hit.01.1 Pek. Tiang Pancang + Jack Hidraulik 1.0000 Lot x Rp. 941,156.98 = Rp. 941,156.98
Pek. Galian Pancang + Jack Hidraulik 1.0000 Lot x Rp. 224,070.00 = Rp. 224,070.00
Jumlah (1) = Rp. 1,165,226.98
PK 6.10. 1 M² Pasang pintu dan jendela kaca panel kayu meranti batu :
6.10.1. Bahan
- Kayu meranti batu, papan 0.0350 M³ x Rp. 8,793,750.00 = Rp. 307,781.25
- Kaca polos 5 mm 0.8000 M³ x Rp. 91,875.00 = Rp. 73,500.00
Jumlah (1) = Rp. 381,281.25
6.10.2. Tenaga
- Pekerja 0.8000 Oh x Rp. 70,000.00 = Rp. 56,000.00
- Tukang kayu 2.0000 Oh x Rp. 110,000.00 = Rp. 220,000.00
- Kepala tukang 0.2000 Oh x Rp. 120,000.00 = Rp. 24,000.00
- Mandor 0.0400 Oh x Rp. 90,000.00 = Rp. 3,600.00
Jumlah (2) = Rp. 303,600.00
Jumlah (1) +(2) = Rp. 684,881.25
Hit.1 6.36. 1 M' Plesteran + Acian u/ Bungkus Kolom dan Balok (lebar 50 cm)
6.35.1. Bahan
- Semen portland 2.1600 Kg x Rp. 1,522.50 = Rp. 3,288.60
- Pasir pasang 0.0160 M³ x Rp. 231,000.00 = Rp. 3,696.00
Jumlah (1) = Rp. 6,984.60
6.35.2. Tenaga
- Pekerja 0.0750 Oh x Rp. 70,000.00 = Rp. 5,250.00
- Tukang batu 0.1400 Oh x Rp. 90,000.00 = Rp. 12,600.00
- Mandor 0.0160 Oh x Rp. 90,000.00 = Rp. 1,440.00
Jumlah (2) = Rp. 19,290.00
Jumlah (1) + (2) = Rp. 26,274.60
ANALISA BIAYA KONSTRUKSI
PEKERJAAN PLESTERAN
ANALISA BIAYA KONSTRUKSI
PEKERJAAN KUNCI DAN KACA
P.K.K. 6.1 1 set Pasang Pull Handle Dekkson PH D001Z SN
6.1.1 Bahan
- Kunci tanam antik 1.000 Bh x Rp. 498,750.00 = Rp. 498,750.00
Jumlah (1) = Rp. 498,750.00
6.1.2 Tenaga
- Pekerja 0.030 Oh x Rp. 70,000.00 = Rp. 2,100.00
- Tukang Kayu 0.300 Oh x Rp. 110,000.00 = Rp. 33,000.00
Jumlah (2) = Rp. 35,100.00
Jumlah(1)+ (2) = Rp. 533,850.00
P.K.K. 6.1.A. 1 set Pasang Pull Handle Dekson PH 146 25X232X300 PSS+SSS
6.1.1 Bahan
- Kunci tanam antik 1.000 Bh x Rp. 708,750.00 = Rp. 708,750.00
Jumlah (1) = Rp. 708,750.00
6.1.2 Tenaga
- Pekerja 0.030 Oh x Rp. 70,000.00 = Rp. 2,100.00
- Tukang Kayu 0.300 Oh x Rp. 110,000.00 = Rp. 33,000.00
Jumlah (2) = Rp. 35,100.00
Jumlah (1) + (2) = Rp. 743,850.00
P.K.K. 6.2 1 set Pasang Handle Full Set Dekkson LHTR 0018 SSS + Kunci KC 8123
6.2.1 Bahan
- Kunci tanam biasa 1.000 Bh x Rp. 429,975.00 = Rp. 429,975.00
Jumlah (1) = Rp. 429,975.00
6.1.2 Tenaga
- Pekerja 0.090 Oh x Rp. 70,000.00 = Rp. 6,300.00
- Tukang Kayu 0.900 Oh x Rp. 110,000.00 = Rp. 99,000.00
Jumlah (2) = Rp. 105,300.00
Jumlah (1) + (2) = Rp. 535,275.00
P.K.K. 6.2.A 1 set Pasang Handle Full Set Dekkson LHSR 0016 22mm + Kunci KC 8128
6.2.1 Bahan
- Kunci tanam biasa 1.000 Bh x Rp. 818,055.00 = Rp. 818,055.00
Jumlah (1) = Rp. 818,055.00
6.1.2 Tenaga
- Pekerja 0.090 Oh x Rp. 70,000.00 = Rp. 6,300.00
- Tukang Kayu 0.900 Oh x Rp. 110,000.00 = Rp. 99,000.00
Jumlah (2) = Rp. 105,300.00
Jumlah (1) + (2) = Rp. 923,355.00
P.B.A. Htg.03 1 m² Membuat Railing Tangga dari Besi Hollow 20x40 & 40x60 mm; tbl.2mm
Bahan
- Besi Hollow 20x40; tbl. 2 mm 4.4000 M´ x Rp. 10,301.93 = Rp. 45,328.51
- Besi Hollow 40x60; tbl. 2 mm 5.5000 M´ x Rp. 9,068.83 = Rp. 49,878.54
- Perlengkapan 35% harga pip 1.0000 Lot x Rp. 33,322.47 = Rp. 11,662.86
Jumlah (1) = Rp. 106,869.92
Htg.01.2 Tenaga
- Pekerja 1.0500 Oh x Rp. 70,000.00 = Rp. 73,500.00
- Tukang besi 1.0500 Oh x Rp. 110,000.00 = Rp. 115,500.00
- Kepala tukang 0.1050 Oh x Rp. 120,000.00 = Rp. 12,600.00
- Mandor 0.0053 Oh x Rp. 90,000.00 = Rp. 472.50
Jumlah (2) = Rp. 202,072.50
P.B.A. Htg.04 1 Kg Pekerjaan Besi Hollow
6.1.1 Bahan
- Besi profil WF 1.1500 Kg x Rp. 10,301.93 = Rp. 11,847.22
Jumlah (1) = Rp. 11,847.22
6.1.2. Tenaga
- Tukang besi 0.0030 Oh x Rp. 498,750.00 = Rp. 1,496.25
- Pekerja 0.0300 Oh x Rp. 90,300.00 = Rp. 2,709.00
- Kepala tukang 0.0030 Oh x Rp. 275,100.00 = Rp. 825.30
- Mandor 0.0002 Oh x Rp. 9,750.00 = Rp. 1.46
Jumlah (2) = Rp. 5,032.01
ANALISA BIAYA KONSTRUKSI
PEKERJAAN BESI DAN ALUMINIUM
Jumlah (1) +(2) = Rp. 16,879.24
ANALISA HARGA SATUAN
PEKERJAAN LISTRIK
P.S. 6.18. Memasang 1 buah bak kontrol pasangan batu bata ukuran (45 x 45) cm; tinggi 50 cm
6.18.1. Bahan
- Batu bata 40.50000 Bh x Rp. 525.00 = Rp. 21,262.50
- Semen portland 77.00000 Kg x Rp. 1,522.50 = Rp. 117,232.50
- Pasir pasang 0.13000 M³ x Rp. 231,000.00 = Rp. 30,030.00
- Batu koral 0.02000 M³ x Rp. 304,500.00 = Rp. 6,090.00
- Pasir beton 0.09000 M³ x Rp. 262,500.00 = Rp. 23,625.00
Jumlah (1) = Rp. 198,240.00
6.18.2. Tenaga
- Pekerja 0.71000 Oh x Rp. 70,000.00 = Rp. 49,700.00
- Tukang batu 0.23650 Oh x Rp. 90,000.00 = Rp. 21,285.00
- Kepala tukang 0.02350 Oh x Rp. 120,000.00 = Rp. 2,820.00
- Mandor 0.03550 Oh x Rp. 90,000.00 = Rp. 3,195.00
Jumlah (2) = Rp. 77,000.00
Jumlah (1) +(2) = Rp. 275,240.00
P.P.L. 6.49 1 M² Pasang lantai keramik tangga 33,3 x 66.6 cm + step noising
6.49.1 Bahan
- Keramik Roman 33,3x 66,6 cm + step noising 4.7345 Bh x Rp. 49,484.22 = Rp. 234,281.25
- Semen portland 11.3800 Kg x Rp. 1,522.50 = Rp. 17,326.05
- Pasir pasang 0.0420 M³ x Rp. 231,000.00 = Rp. 9,702.00
- Semen warna 1.5000 Kg x Rp. 1,522.50 = Rp. 2,283.75
Jumlah (1) = Rp. 263,593.05
6.49.2 Tenaga
- Pekerja 0.7440 Oh x Rp. 70,000.00 = Rp. 52,080.00
- Tukang batu 0.4200 Oh x Rp. 90,000.00 = Rp. 37,800.00
- Kepala tukang 0.0420 Oh x Rp. 120,000.00 = Rp. 5,040.00
- Mandor 0.0360 Oh x Rp. 90,000.00 = Rp. 3,240.00
Jumlah (2) = Rp. 98,160.00
Jumlah (1) + (2) = Rp. 361,753.05
P.C. 6.9. 1M² Pengecatan bidang kayu baru (1 lps many + 1 lapis cat minyak)
6.9.1 Bahan
- Cat Menie 0.3700 Kg x Rp. 36,750.00 = Rp. 13,597.50
- Cat Minyak 0.3500 Kg x Rp. 47,250.00 = Rp. 16,537.50
Jumlah (1) = Rp. 13,597.50
6.9.2 Tenaga
- Pekerja 0.0400 Oh x Rp. 70,000.00 = Rp. 2,800.00
- Tukang cat 0.0400 Oh x Rp. 100,000.00 = Rp. 4,000.00
- Kepala tukang 0.0400 Oh x Rp. 120,000.00 = Rp. 4,800.00
- Mandor 0.0025 Oh x Rp. 90,000.00 = Rp. 225.00
Jumlah (2) = Rp. 11,825.00
Jumlah (1) + (2) = Rp. 25,422.50
P.P.A. Hit.1 1 M² Pasang Rangka Atap System Kremona (Trust 0,75 + Kanal 45)
1.1. Bahan
- Kanal/ Trust 75 mm 4.4000 M' x Rp. 11,375.00 = Rp.
- Reng 2.2000 M' x Rp. 9,750.00 = Rp.
- Paku seng + ring karet 16.0000 Bh x Rp. 337.50 = Rp.
Jumlah (1) = Rp.
1.2. Tenaga
- Pekerja 0.1818 Oh x Rp. 70,000.00 = Rp.
- Tukang Kayu 0.1818 Oh x Rp. 110,000.00 = Rp.
- Kepala Tukang 0.0182 Oh x Rp. 120,000.00 = Rp.
- Mandor 0.0182 Oh x Rp. 90,000.00 = Rp.
Jumlah (2) = Rp.
Jumlah (1) + (2) = Rp.
P.P.A. Hit.4 1 M' Pasang Listplank GRC Uk.20 cm x 4050 cm Motif Kayu
1.1 Bahan
- GRC tbl.3cm; Motif Kayu 1.1000 m' x Rp. 17,826.67 = Rp.
- Paku Seng 3.0000 bh x Rp. 337.50 = Rp.
Jumlah (1) = Rp.
1.2 Tenaga
- Pekerja 0.0244 Oh x Rp. 70,000.00 = Rp.
- Tukang Kayu 0.0489 Oh x Rp. 110,000.00 = Rp.
- Kepala Tukang 0.0049 Oh x Rp. 120,000.00 = Rp.
- Mandor 0.0011 Oh x Rp. 90,000.00 = Rp.
Jumlah (2) = Rp.
Jumlah (1) + (2) = Rp.
12,727.27
20,000.00
2,181.82
1,636.36
36,545.45
113,445.45
10,825.92
2,025.00
12,850.92
6,363.64
10,000.00
1,090.91
818.18
18,272.73
31,123.65
99,330.00
2,913.75
102,243.75
1,680.00
3,928.57
445.71
102.86
6,157.14
108,400.89
19,609.33
1,012.50
20,621.83
1,711.11
5,377.78
586.67
100.00
7,775.56
28,397.39
16,757.48
1,456.88
18,214.36
1,711.11
5,377.78
586.67
100.00
7,775.56
25,989.91