KEGIATAN : PEK. STRUKTUR GEDUNG PASTORI DAN GEREJA GPdI PORSEA TAHAP III
PEMILIK : JEMAAT GPdI PORSEA
SUMBER DANA : SWAKELOLA
LOKASI : PORSEA
PENAWAR : RALES F. SIMAMORA
KODE HARGA
NO JENIS DAN URAIAN PEKERJAAN
ANALISA VOLUME SATUAN
PEKERJAAN (Rupiah)
1 2.0 3.0 4.0 5.0
I. PEKERJAAN DI ELEVASI MINUS ± 1.45 s/d ± 4.00 M'
A. PEKERJAAN PERSIAPAN
1 Pek. Mobilisasi dan Demobilisasi Pekerja & Alat Kerja L.S. 1.00 Lot 2,000,000.00
2 Pek. Pengukuran dan Pasang Bouwplank P.A. 6.1.a 32.75 M' 16,000.00
TOTAL PEKERJAAN PERSIAPAN (..a)
B. PEKERJAAN TANAH
1 Pek. Pembuangan Tanah Ke Area Peninggian Lantai P.T.6.5 22.39 M³ 47,519.05
2 Pek. Timbunan Tanah s/d Elev. 80 cm dr.Muka Tanah P.T.6.7 11.19 M³ 32,538.00
3 Pek. Timbunan Pasir s/d Elev. 90 cm dr.Muka Tanah P.T.6.7 11.19 M³ 32,538.00
TOTAL PEKERJAAN TANAH (…b)
C. PEKERJAAN BETON S/D ELEVASI 4.50 m'
C.1. Pekerjaan Kolom s/d Elevasi = 4.50 Mtr
C.1.1. Pek.Kolom 15x15 cm
a. Pek. mall/ beugisting P.B.6.28 13.50 M² 88,357.50
b. Pek. pembesian
b.1. Stek Besi ø12 mm P.B.6.25 61.62 Kg 2,994.08
b.2. Beugel Besi ø8 mm P.B.6.25 19.04 Kg 2,994.08
c. Pek. pengecoran P.B.6.13. 0.51 M³ 194,827.05
C.1.2. Pek. Kolom 15x20 cm
a. Pek. Mall/ Beugisting P.B.6.28 15.75 M² 88,357.50
b. Pek. Pembesian
b.1. Stek Besi ø14 mm P.B.6.25 88.73 Kg 2,994.08
b.3. Beugel Besi ø8 mm P.B.6.25 25.79 Kg 2,994.08
c. Pek. Pengecoran P.B.6.13. 0.68 M³ 194,827.05
C.1.3. Pek. Kolom uk.25x40 cm
a. Pek. mall/ beugisting P.B.6.28 29.25 M² 88,357.50
b. Pek. pembesian
b.1. Stek Besi ø14 mm P.B.6.25 177.54 Kg 2,994.08
b.2. Besi Sumbu ø12 mm P.B.6.25 43.48 Kg 2,994.08
b.3. Beugel Besi ø8 mm P.B.6.25 32.66 Kg 2,994.08
c. Pek. pengecoran P.B.6.13. 2.25 M³ 194,827.05
C.1.4. Pek. Kolom uk.20x30
a. Pek. Mall/ Beugisting P.B.6.28 94.50 M² 88,357.50
b. Pek. Pembesian
b.1. Stek Besi ø14 mm P.B.6.25 745.67 Kg 2,994.08
b.2. Besi Sumbu ø12 mm P.B.6.25 182.61 Kg 2,994.08
b.3. Beugel Besi ø8 mm P.B.6.25 122.75 Kg 2,994.08
c. Pek. Pengecoran P.B.6.13. 5.67 M³ 194,827.05
Terbilang : SERATUS TIGA PULUH JUTA SERATUS LIMA PULUH RIBU RUPIAH
Catatan:
A. Rencana Anggaran Biaya (RAB) Sipil diatas tidak termaksud Pekerjaan
1. Pekerjaan Plesteran
2. Pekerjaan Kusen Pelaksana (Kontra
3. Batasan pekerjaan yang sudah disepakati
B. Daya Dukung Alat untuk Pekerjaan Tersebut disediakan oleh Pihak Owner/ (Gereja)
C. Hal-Hal Pekerjaan yang dianggap perlu dan situsional; akan dibicarakan
dan dituangkan ke dalam Pekerjaan Addendum
JUMLAH
HARGA
(Rupiah)
6.0
2,000,000.00
524,000.00
Rp 2,524,000.00
1,063,722.49
364,184.49
364,184.49
Rp 1,792,091.47
184,495.15
57,009.00
98,631.19
1,391,630.63
Pek. Kolom 15x20Stek
cm Besi ø1 = 88.73
265,673.01
77,211.22
131,508.26
2,584,456.88
531,567.42
130,179.78
97,800.88
438,360.86
8,349,783.75
2,232,583.17
546,755.06
367,525.40
1,104,669.37
7,060,868.72
2,717,516.12
679,379.03
1,132,298.38
1,556,911.66
2,358,703.46
796,310.58
149,308.23
150,105.25
479,031.01
4,450,655.63
629,751.31
184,142.39
346,363.53
2,123,760.87
583,498.79
468,286.30
540,747.90
157,355.00
119,234.15
1,734,497.89
268,920.13
265,705.13
2,185,478.28
555,506.47
124,860.76
551,832.75
67,631.93
37,119.30
80,307.71
404,677.35
67,631.93
28,870.57
53,538.47
257,521.95
67,631.93
20,621.83
26,769.24
945,907.20
314,899.01
160,599.83
166,272.75
21,736.73
22,445.53
332,545.50
102,658.78
56,460.88
52,159.04
76,124.00
89,980.87
651,596.40
884,458.58
7,477.91
15,176.13
16,975.91
87,230.43
587,523.99
8,758.45
12,782.60
15,109.42
109,414.87
297,033.32
4,930,348.50
1,998,371.90
1,435,018.12
Rp 66,665,085.85
1,260,613.94
1,840,462.82
2,058,126.42
- 144.629
-
Rp 5,159,203.18
-
-
-
-
-
-
Rp -
1,084,387.50
241,621.73
89,664.72
1,349,460.00
1,617,185.84
111,582.77
1,265,118.75
342,884.23
119,552.96
2,349,506.25
578,742.83
398,509.88
7,590,712.50
2,387,481.60
1,004,244.89
-
-
-
6,263,422.20
1,870,935.78
1,035,806.87
2,295,206.55
533,577.68
379,567.37
227,641.05
100,743.21
25,097.27
3,003,753.38
912,533.67
662,323.41
Rp 37,841,264.86
1,643,553.20
870,397.58
2,122,985.31
2,511,025.68
986,688.41
- 228.040
-
Rp 8,134,650.18
-
-
Rp -
3,978,866.39
322,695.71
3,094,673.86
645,584.50
Rp 8,041,820.46
Rp 130,158,116.01 ###
Rp 130,150,000.00 288
### ###
Medan,24 Agustus 2018
Terbilang : SERATUS TIGA PULUH JUTA SERATUS LIMA PULUH RIBU RUPIAH
Catatan: Medan,17 Desember
PROGRES PEKERJAAN SAMPAI DENGAN BULAN LALU = - %
PROGRES PEKERJAAN BULAN INI = 30.60 % Dibuat Oleh
PROGRES PEKERJAAN AMPAI DENGAN BULAN INI = 30.60 % Pelaksana (Kontraktor)
Rales F. Simamo
SAMPAI DGN BULAN INI
FISIK BOBOT
(%) (%)
10.0
100.00 1.54
100.00 0.40
100.00 0.82
100.00 0.28
100.00 0.28
100.00 0.92
100.00 0.14
100.00 0.04
100.00 0.08
100.00 1.07
100.00 0.20
100.00 0.06
100.00 0.10
100.00 1.99
100.00 0.41
100.00 0.10
SAMPAI DGN BULAN INI
FISIK BOBOT
(%) (%)
10.0
100.00 0.08
100.00 0.34
100.00 6.42
100.00 1.72
100.00 0.42
100.00 0.28
100.00 0.85
90.00 4.88
70.00 1.46
70.00 0.37
70.00 0.61
- -
90.00 1.63
60.00 0.37
60.00 0.07
60.00 0.07
- -
50.00 1.71
50.00 0.24
40.00 0.06
- -
- -
- -
- -
- -
SAMPAI DGN BULAN INI
FISIK BOBOT
(%) (%)
10.0
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
SAMPAI DGN BULAN INI
FISIK BOBOT
(%) (%)
10.0
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
SAMPAI DGN BULAN INI
FISIK BOBOT
(%) (%)
10.0
25.00 0.24
10.00 0.14
15.00 0.24
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
SAMPAI DGN BULAN INI
FISIK BOBOT
(%) (%)
10.0
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
SAMPAI DGN BULAN INI
FISIK BOBOT
(%) (%)
10.0
- -
- -
- -
- -
- -
- -
30.60
Dibuat Oleh
laksana (Kontraktor)
Rales F. Simamora