DAFTAR HARGA SATUAN UPAH PEKERJAAN

KEGIATAN : PEK. STRUKTUR GEDUNG PASTORI DAN GEREJA GPdI PORSEA TAHAP III
PEMILIK : JEMAAT GPdI PORSEA
SUMBER DANA : SWAKELOLA
LOKASI : PORSEA
PENAWAR : RALES F. SIMAMORA
KODE HARGA
NO JENIS DAN URAIAN PEKERJAAN
ANALISA VOLUME SATUAN
PEKERJAAN (Rupiah)
1 2.0 3.0 4.0 5.0
I. PEKERJAAN DI ELEVASI MINUS ± 1.45 s/d ± 4.00 M'
A. PEKERJAAN PERSIAPAN
1 Pek. Mobilisasi dan Demobilisasi Pekerja & Alat Kerja L.S. 1.00 Lot 2,000,000.00
2 Pek. Pengukuran dan Pasang Bouwplank P.A. 6.1.a 32.75 M' 16,000.00
TOTAL PEKERJAAN PERSIAPAN (..a)
B. PEKERJAAN TANAH
1 Pek. Pembuangan Tanah Ke Area Peninggian Lantai P.T.6.5 22.39 M³ 47,519.05
2 Pek. Timbunan Tanah s/d Elev. 80 cm dr.Muka Tanah P.T.6.7 11.19 M³ 32,538.00
3 Pek. Timbunan Pasir s/d Elev. 90 cm dr.Muka Tanah P.T.6.7 11.19 M³ 32,538.00
TOTAL PEKERJAAN TANAH (…b)
C. PEKERJAAN BETON S/D ELEVASI 4.50 m'
C.1. Pekerjaan Kolom s/d Elevasi = 4.50 Mtr
C.1.1. Pek.Kolom 15x15 cm
a. Pek. mall/ beugisting P.B.6.28 13.50 M² 88,357.50
b. Pek. pembesian
b.1. Stek Besi ø12 mm P.B.6.25 61.62 Kg 2,994.08
b.2. Beugel Besi ø8 mm P.B.6.25 19.04 Kg 2,994.08
c. Pek. pengecoran P.B.6.13. 0.51 M³ 194,827.05
C.1.2. Pek. Kolom 15x20 cm
a. Pek. Mall/ Beugisting P.B.6.28 15.75 M² 88,357.50
b. Pek. Pembesian
b.1. Stek Besi ø14 mm P.B.6.25 88.73 Kg 2,994.08
b.3. Beugel Besi ø8 mm P.B.6.25 25.79 Kg 2,994.08
c. Pek. Pengecoran P.B.6.13. 0.68 M³ 194,827.05
C.1.3. Pek. Kolom uk.25x40 cm
a. Pek. mall/ beugisting P.B.6.28 29.25 M² 88,357.50
b. Pek. pembesian
b.1. Stek Besi ø14 mm P.B.6.25 177.54 Kg 2,994.08
b.2. Besi Sumbu ø12 mm P.B.6.25 43.48 Kg 2,994.08
b.3. Beugel Besi ø8 mm P.B.6.25 32.66 Kg 2,994.08
c. Pek. pengecoran P.B.6.13. 2.25 M³ 194,827.05
C.1.4. Pek. Kolom uk.20x30
a. Pek. Mall/ Beugisting P.B.6.28 94.50 M² 88,357.50
b. Pek. Pembesian
b.1. Stek Besi ø14 mm P.B.6.25 745.67 Kg 2,994.08
b.2. Besi Sumbu ø12 mm P.B.6.25 182.61 Kg 2,994.08
b.3. Beugel Besi ø8 mm P.B.6.25 122.75 Kg 2,994.08
c. Pek. Pengecoran P.B.6.13. 5.67 M³ 194,827.05

C.2. Pekerjaan Ring Balok s/d Elevasi = 4.50 Mtr


C.2.1. Pek. Ring Balok uk.25x50
a. Pek. mall/ beugisting P.B.6.28 79.91 M² 88,357.50
b. Pek. pembesian
b.1. Besi Stek Balok-ø16mm P.B.6.25 907.63 Kg 2,994.08
b.2. Besi As Balok-ø12mm P.B.6.25 226.91 Kg 2,994.08
b.3. Besi Beugel Balok-8mm P.B.6.25 378.18 Kg 2,994.08
c. Pek. pengecoran P.B.6.13. 7.99 M³ 194,827.05

C.2.2. Pek. Ring Balok uk.25x35 cm


a. Pek. mall/ beugisting P.B.6.28 26.70 M² 88,357.50
b. Pek. pembesian
b.1. Besi Stek Balok-ø16mm P.B.6.25 265.96 Kg 2,994.08
b.2. Besi Stek Balok-ø12mm P.B.6.25 49.87 Kg 2,994.08
b.3. Besi Beugel Balok-ø8mm P.B.6.25 50.13 Kg 2,994.08
c. Pek. pengecoran P.B.6.13. 2.46 M³ 194,827.05

C.2.3. Pek. Balok uk.15x20 cm


a. Pek. mall/ beugisting P.B.6.28 50.37 M² 88,357.50
b. Pek. pembesian
b.1. Besi Stek Balok-ø12mm P.B.6.25 210.33 Kg 2,994.08
b.3. Besi Beugel Balok-ø8mm P.B.6.25 61.50 Kg 2,994.08
c. Pek. Pengecoran P.B.6.13. 1.78 M³ 194,827.05
C.2.4. Pek. Plat Teras
a. Pek.Mall P.B.6.28 24.04 M² 88,357.50
b. Pek.Besi P.B.6.25 194.88 Kg 2,994.08
c. Pek. Pengecoran P.B.6.13. 2.40 M³ 194,827.05
C.2.5. Pek. Plat Kanopy (Sisi Kanan Bangunan)
a. Pek.Mall P.B.6.28 6.12 M² 88,357.50
b. Pek.Besi P.B.6.25 52.56 Kg 2,994.08
c. Pek. Pengecoran P.B.6.13. 0.61 M³ 194,827.05
C.2.6. Pek. Balok Janggutan uk.10x40 cm
a. Pek. mall/ beugisting P.B.6.28 21.59 M² 80,325.00
b. Pek. pembesian P.B.6.25 89.82 Kg 2,994.08
c. Pek. Pengecoran P.B.6.13. 1.36 M³ 194,827.05
C.2.7. Pek. Plat Lantai
1 Area Lantai Dalam P.B.6.1. 11.22 M³ 194,827.05
2 Area Voyer (Teras)/Selasar P.B.6.1. 2.85 M³ 194,827.05
3 Rg.Shaf P.B.6.1. 0.64 M³ 194,827.05
4 Area Tangga Luar
4.1. Balok Tangga; uk.15x30
a. Pek.Mall/ Beugisting P.B.6.31. 6.87 M² 80,325.00
b. Pek.Pembesian
b.1. Besi Stek Balok-ø10mm P.B.6.25 22.59 Kg 2,994.08
b.2. Besi Beugel Balok-ø8mm P.B.6.25 12.40 Kg 2,994.08
c. Pek. Pengecoran P.B.6.13. 0.41 M³ 194,827.05
4.2. Balok Tangga; uk.15x20
a. Pek.Mall/ Beugisting P.B.6.31. 5.04 M² 80,325.00
b. Pek.Pembesian
b.1. Besi Stek Balok-ø10mm P.B.6.25 22.59 Kg 2,994.08
b.2. Besi Beugel Balok-ø8mm P.B.6.25 9.64 Kg 2,994.08
c. Pek. Pengecoran P.B.6.13. 0.27 M³ 194,827.05
4.3. Balok Tangga; uk.15x10
a. Pek.Mall/ Beugisting P.B.6.31. 3.21 M² 80,325.00
b. Pek.Pembesian
b.1. Besi Stek Balok-ø10mm P.B.6.25 22.59 Kg 2,994.08
b.2. Besi Beugel Balok-ø8mm P.B.6.25 6.89 Kg 2,994.08
c. Pek. Pengecoran P.B.6.13. 0.14 M³ 194,827.05
5 Pekerjaan Trap Tangga
5.1. Pek.Balok Trap Tangga
a. Pek.Mall/ Beugisting P.B.6.31. 11.78 M² 80,325.00
b. Pek.Pembesian
b.1. Besi Stek Balok-ø8mm P.B.6.25 105.17 Kg 2,994.08
c. Pek. Pengecoran P.B.6.13. 0.82 M³ 194,827.05
6 Pekerjaan Ramp
6.1. Pek.Balok Ramp
a. Pek.Mall/ Beugisting P.B.6.31. 2.07 M² 80,325.00
b. Pek.Pembesian
b.1. Besi Stek Balok-ø10mm P.B.6.25 7.26 Kg 2,994.08
b.2. Besi Beugel Balok-ø8mm P.B.6.25 7.50 Kg 2,994.08
c. Pek. Pengecoran P.B.6.13. 0.10 M³ 194,827.05
6.2. Pek.Plat Ramp
a. Pek.Mall/ Beugisting P.B.6.31. 4.14 M² 80,325.00
b. Pek.Pembesian P.B.6.25 34.29 Kg 2,994.08
c. Pek. Pengecoran P.B.6.13. 0.29 M³ 194,827.05
7 Pekerjaan Tangga
a. Pek.Mall/ Beugisting
a.1. Mall Tangga Type No.4 P.B.6.31. 0.65 M² 80,325.00
a.2. Mall Tangga Type No.5 P.B.6.31. 0.95 M² 80,325.00
a.3. Mall Tangga Type No.6 P.B.6.25 1.12 M² 80,325.00
a.4. Mall Tangga uk.0.30x1.00 P.B.6.25 8.11 M² 80,325.00
a.5. Mall Tangga Penampang Bawah P.B.6.13. 11.01 M² 80,325.00
b. Pek.Pembesian
b.1. Tangga Type No.4 P.B.6.25 2.50 Kg 2,994.08
b.2. Tangga Type No.5 P.B.6.25 5.07 Kg 2,994.08
b.3. Tangga Type No.6 P.B.6.25 5.67 Kg 2,994.08
b.4. Mall Tangga uk.0.30x1.00 P.B.6.25 29.13 Kg 2,994.08
b.5. Mall Tangga Penampang Bawah P.B.6.25 196.23 Kg 2,994.08
c. Pek.Pengecoran
c.1. Tangga Type No.4 P.B.6.13. 0.04 M³ 194,827.05
c.2. Tangga Type No.5 P.B.6.13. 0.07 M³ 194,827.05
c.3. Tangga Type No.6 P.B.6.13. 0.08 M³ 194,827.05
c.4. Tangga uk.0.30x1.00 P.B.6.13. 0.56 M³ 194,827.05
c.5. Tangga Penampang Bawah P.B.6.13. 1.52 M³ 194,827.05
8 Pekerjaan Plat Lantai Balkon
a. Pek.Mall/ Beugisting P.B.6.31. 61.38 M² 80,325.00
b. Pek.Pembesian P.B.6.25 667.44 Kg 2,994.08
c. Pek.Pengecoran P.B.6.13. 7.37 M³ 194,827.05
TOTAL PEKERJAAN BETON (…c)
D. PEKERJAAN DINDING
1. Pasangan Batu Bata; Tbl.1/2 Bata; Spesi 1:3
a. Sisi Kanan Bangunan P.D.6.10 35.34 M² 35,672.03
b. Sisi Kiri Bangunan P.D.6.10 51.59 M² 35,672.03
c. Sisi Depan Bangunan P.D.6.10 57.70 M² 35,672.03
2 Pekerjaan Plesteran; Spesi 1:3 P.Ps.6.2. 0.00 M² -
3 Pekerjaan Acian P.Ps.Htng 1 0.00 M² -
TOTAL PEKERJAAN DINDING (…d)
E. PEKERJAAN KUSEN
1. Sisi Kanan Bangunan
Kusen J-3 P.K.6.2. 0.000 M³ -
2. Sisi Kiri Bangunan
Kusen J-2 P.K.6.2. 0.000 M³ -
Kusen J-1 P.K.6.2. 0.000 M³ -
3. Sisi Depan Bangunan
Kusen BV P.K.6.2. 0.000 M³ -
Kusen PU P.K.6.2. 0.000 M³ -
Kusen J-3 P.K.6.2. 0.000 M³ -
Kusen P-3 P.K.6.2. 0.000 M³ -
TOTAL PEKERJAAN KUSEN (…e)
F. PEKERJAAN BETON S/D ELEVASI 9.98 m'
F.1. Pekerjaan Kolom s/d Elevasi =
F.1.1. Pek.Kolom 15x15 cm; h=4.50m'
- Pek. Mall/ Beugisting P.B.6.28 13.50 M² 80,325.00
- Pek. Pembesian P.B.6.25 80.70 Kg 2,994.08
- Pek. Pengecoran P.B.6.13. 0.51 M³ 177,115.50
F.1.1.a Pek.Kolom 15x15 cm; h=2.00m'
- Pek. Mall/ Beugisting P.B.6.28 16.80 M² 80,325.00
- Pek. Pembesian P.B.6.25 540.13 Kg 2,994.08
- Pek. Pengecoran P.B.6.13. 0.63 M³ 177,115.50
F.1.2. Pek. Kolom 15x20 cm
- Pek. Mall/ Beugisting P.B.6.28 15.75 M² 80,325.00
- Pek. Pembesian P.B.6.25 114.52 Kg 2,994.08
- Pek. Pengecoran P.B.6.13. 0.68 M³ 177,115.50
F.1.3. Pek. Kolom uk.25x40 cm
- Pek. Mall/ Beugisting P.B.6.28 29.25 M² 80,325.00
- Pek. Pembesian P.B.6.25 193.30 Kg 2,994.08
- Pek. Pengecoran P.B.6.13. 2.25 M³ 177,115.50
F.1.4. Pek. Kolom uk.20x30
- Pek. Mall/ Beugisting P.B.6.28 94.50 M² 80,325.00
- Pek. Pembesian P.B.6.25 797.40 Kg 2,994.08
- Pek. Pengecoran P.B.6.13. 5.67 M³ 177,115.50
F.1.5. Pek. Kolom Fantasi
- Pek. Mall/ Beugisting P.B.6.28 0.00 M² 80,325.00
- Pek. Pembesian P.B.6.25 0.00 Kg 2,994.08
- Pek. Pengecoran P.B.6.13. 0.00 M³ 177,115.50
F.2. Pek. Ring Balok 20x30
- Pek. Mall/Beugisting P.B.6.28 77.98 M² 80,325.00
- Pek. Pembesian P.B.6.25 624.88 Kg 2,994.08
- Pek.Pengecoran P.B.6.13. 5.85 M³ 177,115.50
F.3. Pek. Ring Balok 15x60
- Pek. Mall/Beugisting P.B.6.28 28.57 M² 80,325.00
- Pek.Pembesian P.B.6.25 178.21 Kg 2,994.08
- Pekerjaan Pengecoran P.B.6.13. 2.14 M³ 177,115.50
F.4. Pek. Ring Balok 10x10
- Pek. Mall/Beugisting P.B.6.28 2.83 M² 80,325.00
- Pek. Pembesian P.B.6.25 33.65 Kg 2,994.08
- Pek.Pengecoran P.B.6.13. 0.14 M³ 177,115.50
F.5. Pekerjaan Plat Talang Beton
- Pekerjaan Mall/Beugisting P.B.6.28 37.40 M² 80,325.00
- Pekerjaan Pembesian P.B.6.25 304.78 Kg 2,994.08
- Pek.Pengecoran P.B.6.13. 3.74 M³ 177,115.50
TOTAL PEKERJAAN BETON (…f)
G. PEKERJAAN DINDING
1. Pasangan Batu Bata; Tbl.1/2 Bata; Spesi 1:3
a. Sisi Kanan Bangunan; H= 4.50 m P.D.6.10 46.07 M² 35,672.03
b. Sisi Kanan Bangunan; H= 2.00 m P.D.6.10 24.40 M² 35,672.03
c. Sisi Kiri Bangunan P.D.6.10 59.51 M² 35,672.03
d. Sisi Depan Bangunan P.D.6.10 70.39 M² 35,672.03
e. Sisi Depan Bangunan; H=2.00 m P.D.6.10 27.66 M² 35,672.03
2 Pekerjaan Plesteran; Spesi 1:3 P.Ps.6.2. 0.00 M² -
3 Pekerjaan Acian P.Ps.Htng 1 0.00 M² -
TOTAL PEKERJAAN DINDING (…g)
H PEKERJAAN KUSEN
1 Sisi Kiri Bangunan P.K.6.2. 0.00 M³ 297,908.00
2 Sisi Kanan Bangunan P.K.6.2. 0.00 M³ 297,908.00
TOTAL PEKERJAAN KUSEN (…h)
I PEKERJAAN ATAP
1 Pekerjaan Rangka Atap; Trust 100x100x100mm 117.38 117.38 M² 33,897.60
2 Pekerjaan Nok Genteng Metal 10.97 10.97 M² 29,416.20
3 Pekerjaan Atap Spandek 117.38 117.38 M² 26,364.80
4 Pekerjaan Aluminium Foil 117.38 117.38 M² 5,500.00
TOTAL PEKERJAAN DINDING (…i)

TOTAL HARGA PEKERJAAN (a)+(b)+(c)+(d)+€+(f)+(g)+(h)


DIBULATKAN

Terbilang : SERATUS TIGA PULUH JUTA SERATUS LIMA PULUH RIBU RUPIAH

Catatan:
A. Rencana Anggaran Biaya (RAB) Sipil diatas tidak termaksud Pekerjaan
1. Pekerjaan Plesteran
2. Pekerjaan Kusen Pelaksana (Kontra
3. Batasan pekerjaan yang sudah disepakati
B. Daya Dukung Alat untuk Pekerjaan Tersebut disediakan oleh Pihak Owner/ (Gereja)
C. Hal-Hal Pekerjaan yang dianggap perlu dan situsional; akan dibicarakan
dan dituangkan ke dalam Pekerjaan Addendum
JUMLAH
HARGA
(Rupiah)
6.0

2,000,000.00
524,000.00
Rp 2,524,000.00

1,063,722.49
364,184.49
364,184.49
Rp 1,792,091.47

1,192,826.25 Pek.Kolom 15x15 cm

184,495.15
57,009.00
98,631.19

1,391,630.63
Pek. Kolom 15x20Stek
cm Besi ø1 = 88.73
265,673.01
77,211.22
131,508.26

2,584,456.88

531,567.42
130,179.78
97,800.88
438,360.86

8,349,783.75
2,232,583.17
546,755.06
367,525.40
1,104,669.37

7,060,868.72

2,717,516.12
679,379.03
1,132,298.38
1,556,911.66

2,358,703.46

796,310.58
149,308.23
150,105.25
479,031.01

4,450,655.63

629,751.31
184,142.39
346,363.53

2,123,760.87
583,498.79
468,286.30

540,747.90
157,355.00
119,234.15

1,734,497.89
268,920.13
265,705.13

2,185,478.28
555,506.47
124,860.76
551,832.75

67,631.93
37,119.30
80,307.71

404,677.35

67,631.93
28,870.57
53,538.47

257,521.95

67,631.93
20,621.83
26,769.24

945,907.20

314,899.01
160,599.83

166,272.75

21,736.73
22,445.53

332,545.50
102,658.78
56,460.88

52,159.04
76,124.00
89,980.87
651,596.40
884,458.58

7,477.91
15,176.13
16,975.91
87,230.43
587,523.99

8,758.45
12,782.60
15,109.42
109,414.87
297,033.32

4,930,348.50
1,998,371.90
1,435,018.12
Rp 66,665,085.85

1,260,613.94
1,840,462.82
2,058,126.42
- 144.629
-
Rp 5,159,203.18

-
-

-
-
-
-
Rp -

1,084,387.50
241,621.73
89,664.72

1,349,460.00
1,617,185.84
111,582.77
1,265,118.75
342,884.23
119,552.96

2,349,506.25
578,742.83
398,509.88

7,590,712.50
2,387,481.60
1,004,244.89

-
-
-

6,263,422.20
1,870,935.78
1,035,806.87

2,295,206.55
533,577.68
379,567.37

227,641.05
100,743.21
25,097.27

3,003,753.38
912,533.67
662,323.41
Rp 37,841,264.86

1,643,553.20
870,397.58
2,122,985.31
2,511,025.68
986,688.41
- 228.040
-
Rp 8,134,650.18

-
-
Rp -

3,978,866.39
322,695.71
3,094,673.86
645,584.50
Rp 8,041,820.46

Rp 130,158,116.01 ###
Rp 130,150,000.00 288

### ###
Medan,24 Agustus 2018

Dibuat Oleh 144


Pelaksana (Kontraktor)
385000 = ###
510000 = ###

Rales F. Simamora ###


###
PROGGRES PEKERJAAN
KEGIATAN : PEK. STRUKTUR GEDUNG PASTORI DAN GEREJA GPdI PORSEA TAHAP III
PEMILIK : JEMAAT GPdI PORSEA
SUMBER DANA : SWAKELOLA
LOKASI : PORSEA
PENAWAR : RALES F. SIMAMORA
HARGA JUMLAH BOBOT SAMPAI DGN BULAN LALU BULAN INI SAMPAI DGN BULA
NO JENIS DAN URAIAN PEKERJAAN VOLUME SATUAN HARGA KERJA VOLUME FISIK BOBOT VOLUME FISIK BOBOT VOLUME
(Rupiah) (Rupiah) (%) (%) (%) (%) (%) (%) (%) (%)
1 2.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0
I. PEKERJAAN DI ELEVASI MINUS ± 1.45 s/d ± 4.00 M'
A. PEKERJAAN PERSIAPAN
1 Pek. Mobilisasi dan Demobilisasi Pekerja & Alat Kerja 1.00 Lot 2,000,000 2,000,000.00 1.54 - - - 1.00 100.00 1.54 1.00
2 Pek. Pengukuran dan Pasang Bouwplank 32.75 M' 16,000.00 524,000.00 0.40 - - - 32.75 100.00 0.40 32.75
Rp 2,524,000.00
B. PEKERJAAN TANAH
1 Pek. Pembuangan Tanah Ke Area Peninggian Lantai 22.39 M³ 47,519.05 1,063,722.49 0.82 - - - 22.39 100.00 0.82 22.39
2 Pek. Timbunan Tanah s/d Elev. 80 cm dr.Muka Tanah 11.19 M³ 32,538.00 364,184.49 0.28 - - - 11.19 100.00 0.28 11.19
3 Pek. Timbunan Pasir s/d Elev. 90 cm dr.Muka Tanah 11.19 M³ 32,538.00 364,184.49 0.28 - - - 11.19 100.00 0.28 11.19
Rp 1,792,091.47
C. PEKERJAAN BETON S/D ELEVASI 4.50 m'
C.1. Pekerjaan Kolom s/d Elevasi = 4.5 Mtr
C.1.1. Pek.Kolom 15x15 cm
a. Pek. mall/ beugisting 13.50 M² 88,357.50 1,192,826.25 0.92 - - - 13.50 100.00 0.92 13.50
b. Pek. pembesian
b.1. Stek Besi ø12 mm 61.62 Kg 2,994.08 184,495.15 0.14 - - - 61.62 100.00 0.14 61.62
b.2. Beugel Besi ø8 mm 19.04 Kg 2,994.08 57,009.00 0.04 - - - 19.04 100.00 0.04 19.04
c. Pek. pengecoran 0.51 M³ 194,827.05 98,631.19 0.08 - - - 0.51 100.00 0.08 0.51
C.1.2. Pek. Kolom 15x20 cm
a. Pek. Mall/ Beugisting 15.75 M² 88,357.50 1,391,630.63 1.07 - - - 15.75 100.00 1.07 15.75
b. Pek. Pembesian
b.1. Stek Besi ø14 mm 88.73 Kg 2,994.08 265,673.01 0.20 - - - 88.73 100.00 0.20 88.73
b.3. Beugel Besi ø8 mm 25.79 Kg 2,994.08 77,211.22 0.06 - - - 25.79 100.00 0.06 25.79
c. Pek. Pengecoran 0.68 M³ 194,827.05 131,508.26 0.10 - - - 0.68 100.00 0.10 0.68
C.1.3. Pek. Kolom uk.25x40 cm
a. Pek. mall/ beugisting 29.25 M² 88,357.50 2,584,456.88 1.99 - - - 29.25 100.00 1.99 29.25
b. Pek. pembesian
b.1. Stek Besi ø14 mm 177.54 Kg 2,994.08 531,567.42 0.41 - - - 177.54 100.00 0.41 177.54
b.2. Besi Sumbu ø12 mm 43.48 Kg 2,994.08 130,179.78 0.10 - - - 43.48 100.00 0.10 43.48
HARGA JUMLAH BOBOT SAMPAI DGN BULAN LALU BULAN INI SAMPAI DGN BULA
NO JENIS DAN URAIAN PEKERJAAN VOLUME SATUAN HARGA KERJA VOLUME FISIK BOBOT VOLUME FISIK BOBOT VOLUME
(Rupiah) (Rupiah) (%) (%) (%) (%) (%) (%) (%) (%)
1 2.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0
b.3. Beugel Besi ø8 mm 32.66 Kg 2,994.08 97,800.88 0.08 - - - 32.66 100.00 0.08 32.66
c. Pek. pengecoran 2.25 M³ 194,827.05 438,360.86 0.34 - - - 2.25 100.00 0.34 2.25
C.1.4. Pek. Kolom uk.20x30
a. Pek. Mall/ Beugisting 94.50 M² 88,357.50 8,349,783.75 6.42 - - - 94.50 100.00 6.42 94.50
b. Pek. Pembesian
b.1. Stek Besi ø14 mm 745.67 Kg 2,994.08 2,232,583.17 1.72 - - - 745.67 100.00 1.72 745.67
b.2. Besi Sumbu ø12 mm 182.61 Kg 2,994.08 546,755.06 0.42 - - - 182.61 100.00 0.42 182.61
b.3. Beugel Besi ø8 mm 122.75 Kg 2,994.08 367,525.40 0.28 - - - 122.75 100.00 0.28 122.75
c. Pek. Pengecoran 5.67 M³ 194,827.05 1,104,669.37 0.85 - - - 5.67 100.00 0.85 5.67
C.2. Pekerjaan Ring Balok s/d Elevasi = 4.5 Mtr
C.2.1. Pek. Ring Balok uk.25x50
a. Pek. mall/ beugisting 79.91 M² 88,357.50 7,060,868.72 5.42 - - - 71.92 90.00 4.88 71.92
b. Pek. pembesian
b.1. Besi Stek Balok-ø16mm 907.63 Kg 2,994.08 2,717,516.12 2.09 - - - 635.34 70.00 1.46 635.34
b.2. Besi As Balok-ø12mm 226.91 Kg 2,994.08 679,379.03 0.52 - - - 158.84 70.00 0.37 158.84
b.3. Besi Beugel Balok-8mm 378.18 Kg 2,994.08 1,132,298.38 0.87 - - - 264.73 70.00 0.61 264.73
c. Pek. pengecoran 7.99 M³ 194,827.05 1,556,911.66 1.20 - - - - - - -
C.2.2. Pek. Ring Balok uk.25x35 cm
a. Pek. mall/ beugisting 26.70 M² 88,357.50 2,358,703.46 1.81 - - - 24.03 90.00 1.63 24.03
b. Pek. pembesian
b.1. Besi Stek Balok-ø16mm 265.96 Kg 2,994.08 796,310.58 0.61 - - - 159.58 60.00 0.37 159.58
b.2. Besi Stek Balok-ø12mm 49.87 Kg 2,994.08 149,308.23 0.11 - - - 29.92 60.00 0.07 29.92
b.3. Besi Beugel Balok-ø8mm 50.13 Kg 2,994.08 150,105.25 0.12 - - - 30.08 60.00 0.07 30.08
c. Pek. pengecoran 2.46 M³ 194,827.05 479,031.01 0.37 - - - - - - -
C.2.3. Pek. Balok uk.15x20 cm
a. Pek. mall/ beugisting 50.37 M² 88,357.50 4,450,655.63 3.42 - - - 25.19 50.00 1.71 25.19
b. Pek. pembesian
b.1. Besi Stek Balok-ø12mm 210.33 Kg 2,994.08 629,751.31 0.48 - - - 105.17 50.00 0.24 105.17
b.3. Besi Beugel Balok-ø8mm 61.50 Kg 2,994.08 184,142.39 0.14 - - - 24.60 40.00 0.06 24.60
c. Pek. Pengecoran 1.78 M³ 194,827.05 346,363.53 0.27 - - - - - - -
C.2.4. Pek. Plat Teras
a. Pek.Mall 24.04 M² 88,357.50 2,123,760.87 1.63 - - - - - - -
b. Pek.Besi 194.88 Kg 2,994.08 583,498.79 0.45 - - - - - - -
c. Pek. Pengecoran 2.40 M³ 194,827.05 468,286.30 0.36 - - - - - - -
C.2.5. Pek. Plat Kanopy (Sisi Kanan Bangunan)
a. Pek.Mall 6.12 M² 88,357.50 540,747.90 0.42 - - - - - - -
HARGA JUMLAH BOBOT SAMPAI DGN BULAN LALU BULAN INI SAMPAI DGN BULA
NO JENIS DAN URAIAN PEKERJAAN VOLUME SATUAN HARGA KERJA VOLUME FISIK BOBOT VOLUME FISIK BOBOT VOLUME
(Rupiah) (Rupiah) (%) (%) (%) (%) (%) (%) (%) (%)
1 2.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0
b. Pek.Besi 52.56 Kg 2,994.08 157,355.00 0.12 - - - - - - -
c. Pek. Pengecoran 0.61 M³ 194,827.05 119,234.15 0.09 - - - - - - -
C.2.6. Pek. Balok Janggutan uk.10x40 cm
a. Pek. mall/ beugisting 21.59 M² 80,325.00 1,734,497.89 1.33 - - - - - - -
b. Pek. pembesian 89.82 Kg 2,994.08 268,920.13 0.21 - - - - - - -
c. Pek. Pengecoran 1.36 M³ 194,827.05 265,705.13 0.20 - - - - - - -
C.2.7. Pek. Plat Lantai
1 Area Lantai Dalam 11.22 M³ 194,827.05 2,185,478.28 1.68 - - - - - - -
2 Area Voyer (Teras)/Selasar 2.85 M³ 194,827.05 555,506.47 0.43 - - - - - - -
3 Rg.Shaf 0.64 M³ 194,827.05 124,860.76 0.10 - - - - - - -
4 Area Tangga Luar
4.1. Balok Tangga; uk.15x30
a. Pek.Mall/ Beugisting 6.87 M² 80,325.00 551,832.75 0.42 - - - - - - -
b. Pek.Pembesian
b.1. Besi Stek Balok-ø10mm 22.59 Kg 2,994.08 67,631.93 0.05 - - - - - - -
b.2. Besi Beugel Balok-ø8mm 12.40 Kg 2,994.08 37,119.30 0.03 - - - - - - -
c. Pek. Pengecoran 0.41 M³ 194,827.05 80,307.71 0.06 - - - - - - -
4.2. Balok Tangga; uk.15x20
a. Pek.Mall/ Beugisting 5.04 M² 80,325.00 404,677.35 0.31 - - - - - - -
b. Pek.Pembesian
b.1. Besi Stek Balok-ø10mm 22.59 Kg 2,994.08 67,631.93 0.05 - - - - - - -
b.2. Besi Beugel Balok-ø8mm 9.64 Kg 2,994.08 28,870.57 0.02 - - - - - - -
c. Pek. Pengecoran 0.27 M³ 194,827.05 53,538.47 0.04 - - - - - - -
4.3. Balok Tangga; uk.15x10
a. Pek.Mall/ Beugisting 3.21 M² 80,325.00 257,521.95 0.20 - - - - - - -
b. Pek.Pembesian
b.1. Besi Stek Balok-ø10mm 22.59 Kg 2,994.08 67,631.93 0.05 - - - - - - -
b.2. Besi Beugel Balok-ø8mm 6.89 Kg 2,994.08 20,621.83 0.02 - - - - - - -
c. Pek. Pengecoran 0.14 M³ 194,827.05 26,769.24 0.02 - - - - - - -
5 Pekerjaan Trap Tangga
5.1. Pek.Balok Trap Tangga
a. Pek.Mall/ Beugisting 11.78 M² 80,325.00 945,907.20 0.73 - - - - - - -
b. Pek.Pembesian
b.1. Besi Stek Balok-ø8mm 105.17 Kg 2,994.08 314,899.01 0.24 - - - - - - -
c. Pek. Pengecoran 0.82 M³ 194,827.05 160,599.83 0.12 - - - - - - -
6 Pekerjaan Ramp
HARGA JUMLAH BOBOT SAMPAI DGN BULAN LALU BULAN INI SAMPAI DGN BULA
NO JENIS DAN URAIAN PEKERJAAN VOLUME SATUAN HARGA KERJA VOLUME FISIK BOBOT VOLUME FISIK BOBOT VOLUME
(Rupiah) (Rupiah) (%) (%) (%) (%) (%) (%) (%) (%)
1 2.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0
6.1. Pek.Balok Ramp
a. Pek.Mall/ Beugisting 2.07 M² 80,325.00 166,272.75 0.13 - - - - - - -
b. Pek.Pembesian
b.1. Besi Stek Balok-ø10mm 7.26 Kg 2,994.08 21,736.73 0.02 - - - - - - -
b.2. Besi Beugel Balok-ø8mm 7.50 Kg 2,994.08 22,445.53 0.02 - - - - - - -
c. Pek. Pengecoran 0.10 M³ 194,827.05 - - - - - - - - -
6.2. Pek.Plat Ramp
a. Pek.Mall/ Beugisting 4.14 M² 80,325.00 332,545.50 0.26 - - - - - - -
b. Pek.Pembesian 34.29 Kg 2,994.08 102,658.78 0.08 - - - - - - -
c. Pek. Pengecoran 0.29 M³ 194,827.05 56,460.88 0.04 - - - - - - -
7 Pekerjaan Tangga
a. Pek.Mall/ Beugisting
a.1. Mall Tangga Type No.4 0.65 M² 80,325.00 52,159.04 0.04 - - - - - - -
a.2. Mall Tangga Type No.5 0.95 M² 80,325.00 76,124.00 0.06 - - - - - - -
a.3. Mall Tangga Type No.6 1.12 M² 80,325.00 89,980.87 0.07 - - - - - - -
a.4. Mall Tangga uk.0.30x1.00 8.11 M² 80,325.00 651,596.40 0.50 - - - - - - -
a.5. Mall Tangga Penampang Bawah 11.01 M² 80,325.00 884,458.58 0.68 - - - - - - -
b. Pek.Pembesian
b.1. Tangga Type No.4 2.50 Kg 2,994.08 7,477.91 0.01 - - - - - - -
b.2. Tangga Type No.5 5.07 Kg 2,994.08 15,176.13 0.01 - - - - - - -
b.3. Tangga Type No.6 5.67 Kg 2,994.08 16,975.91 0.01 - - - - - - -
b.4. Mall Tangga uk.0.30x1.00 29.13 Kg 2,994.08 87,230.43 0.07 - - - - - - -
b.5. Mall Tangga Penampang Bawah 196.23 Kg 2,994.08 587,523.99 0.45 - - - - - - -
c. Pek.Pengecoran
c.1. Tangga Type No.4 0.04 M³ 194,827.05 8,758.45 0.01 - - - - - - -
c.2. Tangga Type No.5 0.07 M³ 194,827.05 12,782.60 0.01 - - - - - - -
c.3. Tangga Type No.6 0.08 M³ 194,827.05 15,109.42 0.01 - - - - - - -
c.4. Tangga uk.0.30x1.00 0.56 M³ 194,827.05 109,414.87 0.08 - - - - - - -
c.5. Tangga Penampang Bawah 1.52 M³ 194,827.05 297,033.32 0.23 - - - - - - -
8 Pekerjaan Plat Lantai Balkon
a. Pek.Mall/ Beugisting 61.38 M² 80,325.00 4,930,348.50 3.79 - - - - - - -
b. Pek.Pembesian 667.44 Kg 2,994.08 1,998,371.90 1.54 - - - - - - -
c. Pek.Pengecoran 7.37 M³ 194,827.05 1,435,018.12 1.10 - - - - - - -
Rp 66,665,085.85
D. PEKERJAAN DINDING
1. Pasangan Batu Bata; Tbl.1/2 Bata; Spesi 1:3
HARGA JUMLAH BOBOT SAMPAI DGN BULAN LALU BULAN INI SAMPAI DGN BULA
NO JENIS DAN URAIAN PEKERJAAN VOLUME SATUAN HARGA KERJA VOLUME FISIK BOBOT VOLUME FISIK BOBOT VOLUME
(Rupiah) (Rupiah) (%) (%) (%) (%) (%) (%) (%) (%)
1 2.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0
a. Sisi Kanan Bangunan 35.34 M² 35,672.03 1,260,613.94 0.97 - - - 8.83 25.00 0.24 8.83
b. Sisi Kiri Bangunan 51.59 M² 35,672.03 1,840,462.82 1.41 - - - 5.16 10.00 0.14 5.16
c. Sisi Depan Bangunan 57.70 M² 35,672.03 2,058,126.42 1.58 - - - 8.65 15.00 0.24 8.65
2 Pekerjaan Plesteran; Spesi 1:3 0.00 M² - - - - - - - - - -
3 Pekerjaan Acian 0.00 M² - - - - - - - - - -
Rp 5,159,203.18
E. PEKERJAAN KUSEN
1. Sisi Kanan Bangunan
Kusen J-3 0.000 M³ - - - - - - - - - -
2. Sisi Kiri Bangunan
Kusen J-2 0.000 M³ - - - - - - - - - -
Kusen J-1 0.000 M³ - - - - - - - - - -
3. Sisi Depan Bangunan
Kusen BV 0.000 M³ - - - - - - - - - -
Kusen PU 0.000 M³ - - - - - - - - - -
Kusen J-3 0.000 M³ - - - - - - - - - -
Kusen P-3 0.000 M³ - - - - - - - - - -
Rp -
F. PEKERJAAN BETON S/D ELEVASI 9.98 m'
F.1. Pekerjaan Kolom s/d Elevasi =
F.1.1. Pek.Kolom 15x15 cm; h=4.50m'
- Pek. Mall/ Beugisting 13.50 M² 80,325.00 1,084,387.50 0.83 - - - - - - -
- Pek. Pembesian 80.70 Kg 2,994.08 241,621.73 0.19 - - - - - - -
- Pek. Pengecoran 0.51 M³ 177,115.50 89,664.72 0.07 - - - - - - -
F.1.1.a Pek.Kolom 15x15 cm; h=2.00m'
- Pek. Mall/ Beugisting 16.80 M² 80,325.00 1,349,460.00 1.04 - - - - - - -
- Pek. Pembesian 540.13 Kg 2,994.08 1,617,185.84 1.24 - - - - - - -
- Pek. Pengecoran 0.63 M³ 177,115.50 111,582.77 0.09 - - - - - - -
F.1.2. Pek. Kolom 15x20 cm
- Pek. Mall/ Beugisting 15.75 M² 80,325.00 1,265,118.75 0.97 - - - - - - -
- Pek. Pembesian 114.52 Kg 2,994.08 342,884.23 0.26 - - - - - - -
- Pek. Pengecoran 0.68 M³ 177,115.50 119,552.96 0.09 - - - - - - -
F.1.3. Pek. Kolom uk.25x40 cm
- Pek. Mall/ Beugisting 29.25 M² 80,325.00 2,349,506.25 1.81 - - - - - - -
- Pek. Pembesian 193.30 Kg 2,994.08 578,742.83 0.44 - - - - - - -
- Pek. Pengecoran 2.25 M³ 177,115.50 398,509.88 0.31 - - - - - - -
HARGA JUMLAH BOBOT SAMPAI DGN BULAN LALU BULAN INI SAMPAI DGN BULA
NO JENIS DAN URAIAN PEKERJAAN VOLUME SATUAN HARGA KERJA VOLUME FISIK BOBOT VOLUME FISIK BOBOT VOLUME
(Rupiah) (Rupiah) (%) (%) (%) (%) (%) (%) (%) (%)
1 2.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0
F.1.4. Pek. Kolom uk.20x30 -
- Pek. Mall/ Beugisting 94.50 M² 80,325.00 7,590,712.50 5.83 - - - - - - -
- Pek. Pembesian 797.40 Kg 2,994.08 2,387,481.60 1.83 - - - - - - -
- Pek. Pengecoran 5.67 M³ 177,115.50 1,004,244.89 0.77 - - - - - - -
F.1.5. Pek. Kolom Fantasi
- Pek. Mall/ Beugisting 0.00 M² 80,325.00 - - - - - - - - -
- Pek. Pembesian 0.00 Kg 2,994.08 - - - - - - - - -
- Pek. Pengecoran 0.00 M³ 177,115.50 - - - - - - - - -
F.2. Pek. Ring Balok 20x30
- Pek. Mall/Beugisting 77.98 M² 80,325.00 6,263,422.20 4.81 - - - - - - -
- Pek. Pembesian 624.88 Kg 2,994.08 1,870,935.78 1.44 - - - - - - -
- Pek.Pengecoran 5.85 M³ 177,115.50 1,035,806.87 0.80 - - - - - - -
F.3. Pek. Ring Balok 15x60
- Pek. Mall/Beugisting 28.57 M² 80,325.00 2,295,206.55 1.76 - - - - - - -
- Pek.Pembesian 178.21 Kg 2,994.08 533,577.68 0.41 - - - - - - -
- Pekerjaan Pengecoran 2.14 M³ 177,115.50 379,567.37 0.29 - - - - - - -
F.4. Pek. Ring Balok 10x10
- Pek. Mall/Beugisting 2.83 M² 80,325.00 227,641.05 0.17 - - - - - - -
- Pek. Pembesian 33.65 Kg 2,994.08 100,743.21 0.08 - - - - - - -
- Pek.Pengecoran 0.14 M³ 177,115.50 25,097.27 0.02 - - - - - - -
F.5. Pekerjaan Plat Talang Beton
- Pekerjaan Mall/Beugisting 37.40 M² 80,325.00 3,003,753.38 2.31 - - - - - - -
- Pekerjaan Pembesian 304.78 Kg 2,994.08 912,533.67 0.70 - - - - - - -
- Pek.Pengecoran 3.74 M³ 177,115.50 662,323.41 0.51 - - - - - - -
Rp 37,841,264.86
G. PEKERJAAN DINDING
1. Pasangan Batu Bata; Tbl.1/2 Bata; Spesi 1:3
a. Sisi Kanan Bangunan; H= 4.50 m 46.07 M² 35,672.03 1,643,553.20 1.26 - - - - - - -
b. Sisi Kanan Bangunan; H= 2.00 m 24.40 M² 35,672.03 870,397.58 0.67 - - - - - - -
c. Sisi Kiri Bangunan 59.51 M² 35,672.03 2,122,985.31 1.63 - - - - - - -
d. Sisi Depan Bangunan 70.39 M² 35,672.03 2,511,025.68 1.93 - - - - - - -
e. Sisi Depan Bangunan; H=2.00 m 27.66 M² 35,672.03 986,688.41 0.76 - - - - - - -
2 Pekerjaan Plesteran; Spesi 1:3 0.00 M² - - - - - - - - - -
3 Pekerjaan Acian 0.00 M² - - - - - - - - - -
Rp 8,134,650.18
H PEKERJAAN KUSEN
HARGA JUMLAH BOBOT SAMPAI DGN BULAN LALU BULAN INI SAMPAI DGN BULA
NO JENIS DAN URAIAN PEKERJAAN VOLUME SATUAN HARGA KERJA VOLUME FISIK BOBOT VOLUME FISIK BOBOT VOLUME
(Rupiah) (Rupiah) (%) (%) (%) (%) (%) (%) (%) (%)
1 2.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0
1 Sisi Kiri Bangunan 0.00 M³ 297,908.00 - - - - - - - - -
2 Sisi Kanan Bangunan 0.00 M³ 297,908.00 - - - - - - - - -
Rp -
I PEKERJAAN ATAP
1 Pekerjaan Rangka Atap; Trust 100x100x100mm 117.38 M² 33,897.60 3,978,866.39 3.06 - - - - - - -
2 Pekerjaan Nok Genteng Metal 10.97 M² 29,416.20 322,695.71 0.25 - - - - - - -
3 Pekerjaan Atap Spandek 117.38 M² 26,364.80 3,094,673.86 2.38 - - - - - - -
4 Pekerjaan Aluminium Foil 117.38 M² 5,500.00 645,584.50 0.50 - - - - - - -
Rp 8,041,820.46 100.00 - 30.60

TOTAL HARGA PEKERJAAN (a)+(b)+(c)+(d)+€+(f)+(g)+(h) Rp130,158,116.01


DIBULATKAN Rp130,150,000.00

Terbilang : SERATUS TIGA PULUH JUTA SERATUS LIMA PULUH RIBU RUPIAH
Catatan: Medan,17 Desember
PROGRES PEKERJAAN SAMPAI DENGAN BULAN LALU = - %
PROGRES PEKERJAAN BULAN INI = 30.60 % Dibuat Oleh
PROGRES PEKERJAAN AMPAI DENGAN BULAN INI = 30.60 % Pelaksana (Kontraktor)

Rales F. Simamo
SAMPAI DGN BULAN INI
FISIK BOBOT
(%) (%)
10.0

100.00 1.54
100.00 0.40

100.00 0.82
100.00 0.28
100.00 0.28

100.00 0.92

100.00 0.14
100.00 0.04
100.00 0.08

100.00 1.07

100.00 0.20
100.00 0.06
100.00 0.10

100.00 1.99

100.00 0.41
100.00 0.10
SAMPAI DGN BULAN INI
FISIK BOBOT
(%) (%)
10.0
100.00 0.08
100.00 0.34

100.00 6.42

100.00 1.72
100.00 0.42
100.00 0.28
100.00 0.85

90.00 4.88

70.00 1.46
70.00 0.37
70.00 0.61
- -

90.00 1.63

60.00 0.37
60.00 0.07
60.00 0.07
- -

50.00 1.71

50.00 0.24
40.00 0.06
- -

- -
- -
- -

- -
SAMPAI DGN BULAN INI
FISIK BOBOT
(%) (%)
10.0
- -
- -

- -
- -
- -

- -
- -
- -

- -

- -
- -
- -

- -

- -
- -
- -

- -

- -
- -
- -

- -

- -
- -
SAMPAI DGN BULAN INI
FISIK BOBOT
(%) (%)
10.0

- -

- -
- -
- -

- -
- -
- -

- -
- -
- -
- -
- -

- -
- -
- -
- -
- -

- -
- -
- -
- -
- -

- -
- -
- -
SAMPAI DGN BULAN INI
FISIK BOBOT
(%) (%)
10.0
25.00 0.24
10.00 0.14
15.00 0.24
- -
- -

- -

- -
- -

- -
- -
- -
- -

- -
- -
- -

- -
- -
- -

- -
- -
- -

- -
- -
- -
SAMPAI DGN BULAN INI
FISIK BOBOT
(%) (%)
10.0

- -
- -
- -

- -
- -
- -

- -
- -
- -

- -
- -
- -

- -
- -
- -

- -
- -
- -

- -
- -
- -
- -
- -
- -
- -
SAMPAI DGN BULAN INI
FISIK BOBOT
(%) (%)
10.0
- -
- -

- -
- -
- -
- -
30.60

Medan,17 Desember 2018

Dibuat Oleh
laksana (Kontraktor)

Rales F. Simamora