LELANG DINI TA .

2021
BALAI BESAR PELAKSANAAN JALAN NASIONAL VIII JATIM-BALI

READINESS CRITERIA SOP 1 SOP 4


SOP 2 SOP 3 SOP 5
Pengisian (pembahas
No Satker/Paket Pekerjaan Jumlah Paket Alokasi (Pengajuan (SK POKJA (Tayang di
ID SIRUP DED KAK HPS LAHAN SIPBJ + an reviu
ke BP2JK) terbit) LPSE)
LPSE POKJA

BBPJN VIII Jatim - Bali 107 1.446.879.719.134 87 86 86 86 86 85 85 85 82 82


I
% terhadap Total Paket/Alokasi 100% 100% 81,31% 80,37% 80,37% 80,37% 80,37% 79,44% 79,44% 79,44% 76,64% 76,64%

Prov Jatim 87 1.127.358.061.134 71 70 70 70 70 69 69 69 66 66


A
% terhadap Total Paket/Alokasi 100% 100% 82% 80% 80% 80% 80% 79% 79% 79% 76% 76%

1 SATKER PJN 1 JATIM 22 254.193.739.000 9 9 9 9 9 9 9 9 9 9

2 SATKER PJN 2 JATIM 9 246.590.977.134 9 9 9 9 9 9 9 9 8 8

3 SATKER PJN 3 JATIM 7 139.741.154.000 6 6 6 6 6 6 6 6 6 6

4 SATKER PJN 4 JATIM 9 368.069.618.000 8 8 8 8 8 8 8 8 6 6

5 SATKER SKPD JATIM 1 13.017.723.000 1 1 1 1 1 1 1 1 1 1

6 SATKER P2JN JATIM 30 66.422.356.000 30 29 29 29 29 28 28 28 28 28

7 SATKER BBPJN 5 21.966.603.000 4 4 4 4 4 4 4 4 4 4

8 SATKER SURAMADU 4 17.355.891.000 4 4 4 4 4 4 4 4 4 4

Prov Bali 20 319.521.658.000 16 16 16 16 16 16 16 16 16 16


B
% terhadap Total Paket/Alokasi 100,00% 100,00% 80,00% 80,00% 80,00% 80,00% 80,00% 80,00% 80,00% 80,00% 80,00% 80,00%

1 PJN 1 BALI 5 97.283.114.000 3 3 3 3 3 3 3 3 3 3

2 PJN 2 BALI 2 29.782.191.000 2 2 2 2 2 2 2 2 2 2

3 PJN 3 BALI 4 171.442.017.000 3 3 3 3 3 3 3 3 3 3

4 SKPD BALI 1 2.047.437.000 1 1 1 1 1 1 1 1 1 1

5 SATKER P2JN BALI 8 18.966.899.000 7 7 7 7 7 7 7 7 7 7


Non Kontraktual Paket On Going Kontraktual Status Tender / Lelang

No Satker/Paket Pekerjaan PAGU DIPA


SYC MENJADI MYC MYC LANJUTAN Terkontrak 2021 Proses Lelang Belum Lelang
JUMLAH Jumlah Alokasi TOTAL PAGU
AP SWAKELOLA PADAT KARYA TOTAL ALOKASI
PAKET JUMLAH JUMLAH Paket Kontraktual Jumlah Jumlah
ALOKASI ALOKASI Alokasi PAGU Nilai Kontrak Jumlah Paket Alokasi PAGU Alokasi PAGU
PAKET PAKET Paket Paket

I BBPJN VIII Jatim - Bali 3.064.555.527.000 1.500.171.366.836 73.185.556.000 277.513.797.000 56 1.088.276.779.164 47 725.124.621.164 9 363.152.158.000 7 125.408.028.000 39 339.679.888.134 245.614.831.340 43 832.928.660.000 13 259.030.435.000

A Prov Jawa Timur 2.618.592.633.000 1.167.086.657.836 45.037.044.000 232.741.587.000 52 1.048.319.316.164 43 685.167.158.164 9 363.152.158.000 7 125.408.028.000 28 207.938.562.134 149.834.401.113 38 742.821.338.000 9 161.357.425.000

1 SATKER PJN 1 JATIM 621.138.227.000 225.995.088.836 5.419.996.000 51.282.360.000 13 297.178.564.164 11 247.178.564.164 2 50.000.000.000 2 41.262.218.000 3 39.143.760.000 26.883.374.000 6 215.049.979.000 1 3.480.000.000

2 SATKER PJN 2 JATIM 661.304.117.000 258.722.596.000 14.954.290.000 50.012.227.000 14 337.615.004.000 11 143.874.391.000 3 193.740.613.000 - - 4 66.588.069.134 47.045.337.273 4 168.482.908.000 1 11.520.000.000

3 SATKER PJN 3 JATIM 255.965.856.000 83.152.746.000 - 59.209.684.000 8 51.797.309.000 8 51.797.309.000 - - 2 61.806.117.000 3 51.991.968.000 39.105.999.000 3 80.069.186.000 1 7.680.000.000

4 SATKER PJN 4 JATIM 748.028.521.000 354.702.205.000 20.207.458.000 60.477.396.000 8 298.067.264.000 7 190.523.653.000 1 107.543.611.000 1 14.574.198.000 - - - 6 216.384.982.000 3 132.963.900.000

5 SATKER SKPD JATIM 27.672.827.000 13.745.871.000 - 11.759.920.000 1 2.167.036.000 1 2.167.036.000 - - - - 1 13.017.723.000 8.671.754.000 - - - -

6 SATKER P2JN JATIM 77.521.142.000 62.749.680.000 - - 6 7.005.967.000 4 2.638.033.000 2 4.367.934.000 2 7.765.495.000 16 34.495.782.000 25.914.962.840 12 27.713.049.000 2 4.213.525.000

7 SATKER BBPJN 152.784.622.000 145.284.622.000 - - 1 7.500.000.000 - - 1 7.500.000.000 - - - - - 4 20.466.603.000 1 1.500.000.000

8 SATKER SURAMADU 74.177.321.000 22.733.849.000 4.455.300.000 - 1 46.988.172.000 1 46.988.172.000 - - - - 1 2.701.260.000 2.212.974.000 3 14.654.631.000 - -

B Prov Bali 445.962.894.000 333.084.709.000 28.148.512.000 44.772.210.000 4 39.957.463.000 4 39.957.463.000 - - - - 11 131.741.326.000 95.780.430.227 5 90.107.322.000 4 97.673.010.000

1 PJN 1 BALI 131.833.763.000 100.404.637.000 12.741.638.000 11.970.417.000 2 6.717.071.000 2 6.717.071.000 - - - - 2 52.755.497.000 38.027.013.337 1 43.765.617.000 2 762.000.000

2 PJN 2 BALI 96.462.846.000 33.183.264.000 13.528.893.000 16.510.297.000 2 33.240.392.000 2 33.240.392.000 - - - - 2 29.782.191.000 21.096.920.343 - - - -

3 PJN 3 BALI 190.393.393.000 173.637.516.000 1.877.981.000 14.877.896.000 - - - - - - 2 36.442.017.000 25.630.426.547 1 40.000.000.000 1 95.000.000.000

4 SKPD BALI 5.783.485.000 4.369.885.000 - 1.413.600.000 - - - - - - 1 2.047.437.000 1.703.515.000 - - - -

5 SATKER P2JN BALI 21.489.407.000 21.489.407.000 - - - - - - - - 4 10.714.184.000 9.322.555.000 3 6.341.705.000 1 1.911.010.000


Rencana Lelang Dini TA. 2021 READINESS CRITERIA BP2JK

Oktober November Desember Rencana


No Satker/Paket Pekerjaan Paket MYC/SYC Jumlah Paket Alokasi Nilai HPS SOP 1 SOP 2 SOP 3 SOP 4 SOP 5 Tayang SPSE Tahapan Lelang
Kontrak
ID SIRUP DED KAK HPS LAHAN Pengisian (Pengajuan ke (SK POKJA (pembahasan (Tayang di KODE SPSE
Jumlah Paket Alokasi Jumlah Paket Alokasi Jumlah Paket Alokasi SIPBJ + LPSE BP2JK) terbit) reviu POKJA LPSE)

BBPJN VIII Jatim - Bali 28 196.534.560.134 26 495.941.396.000 34 720.131.023.000 90 1.413.368.979.134 87 86 86 86 86 85 85 85 82 82

A Prov Jatim 20 128.431.441.134 23 432.303.189.000 27 533.112.691.000 70 1.093.847.321.134 71 70 70 70 70 69 69 69 66 66

I SATKER PJN 1 JATIM 1 19.250.764.000 5 121.155.214.000 3 113.787.761.000 22 254.193.739.000 9 9 9 9 9 9 9 9 9 9

PPK 1.1 PROVINSI JAWA TIMUR 1 19.250.764.000 - - - - 14 19.250.764.000

PRESERVASI JALAN DAN JEMBATAN PROBOLINGGO -


1
PAITON - SITUBONDO
Konstruksi SYC 1 19.250.764.000 1 19.250.764.000 19.235.924.000 √ √ √ √ √ √ √ √ √ √ 67024064 12-Nov-20 15-Jan-21 Kontrak

PPK 1.2 PROVINSI JAWA TIMUR - - 1 19.524.287.000 - - 1 19.524.287.000

PRESERVASI JALAN DAN JEMBATAN SITUBONDO - Proses PAM Tanggal 15


1
KETAPANG - BANYUWANGI
Konstruksi SYC 1 19.524.287.000 1 19.524.287.000 19.505.891.000 √ √ √ √ √ √ √ √ √ √ 69225064 1-Dec-20 26-Feb-21
Februari 2021

PPK 1.3 PROVINSI JAWA TIMUR - - - - 1 61.400.085.000 1 61.400.085.000

PEMBANGUNAN JALAN BTS. BLITAR/ MALANG- SP 5 Evaluasi Administrasi,


1
PURWODADI (STA 6+150-11+150)
Konstruksi SYC 1 61.400.085.000 1 61.400.085.000 61.328.049.000 √ √ √ √ √ √ √ √ √ √ 70458064 5-Jan-21 11-Mar-21
Kualifikasi, Teknis, dan Harga

PPK 1.4 PROVINSI JAWA TIMUR - - - - 1 28.129.786.000 1 28.129.786.000

Evaluasi Administrasi,
1 PEMBANGUNAN JALAN SIDODADI - SUMBEREJO Konstruksi SYC 1 28.129.786.000 1 28.129.786.000 28.112.586.000 √ √ √ √ √ √ √ √ √ √ 70077064 28-Dec-20 16 ar 2020
Kualifikasi, Teknis, dan Harga

PPK 1.5 PROVINSI JAWA TIMUR - - 2 81.737.931.000 - - 2 81.737.931.000

PRESERVASI JALAN DAN JEMBATAN PROBOLINGGO -


1
LUMAJANG - TUREN
Konstruksi SYC 1 21.737.931.000 1 21.737.931.000 21.723.089.000 √ √ √ √ √ √ √ √ √ √ 69218064 2-Dec-20 9-Mar-20 Masa Sanggah

PELEBARAN MENAMBAH LAJUR PROBOLINGGO - Evaluasi Administrasi,


2
GROBOGAN - LUMAJANG (2)
Konstruksi SYC 1 60.000.000.000 1 60.000.000.000 59.980.470.000 √ √ √ √ √ √ √ √ √ √ 69566064 7-Dec-20 8-Mar-21
Kualifikasi, Teknis, dan Harga

PPK 1.6 PROVINSI JAWA TIMUR - - 1 11.020.424.000 - - 1 11.020.424.000

PRESERVASI JALAN DAN JEMBATAN WONOREJO - JEMBER -


1
SUMBERJATI
Konstruksi SYC 1 11.020.424.000 1 11.020.424.000 10.382.899.000 √ √ √ √ √ √ √ √ √ √ 69376064 1-Dec-20 24-Feb-21 Kontrak

PEMBANGUNAN JEMBATAN GANTUNG SABRANG


2 Konstruksi SYC 1 3.480.000.000 Proses penyiapan Desain
KAB.JEMBER

PPK 1.7 PROVINSI JAWA TIMUR - - 1 8.872.572.000 1 24.257.890.000 2 33.130.462.000

PRESERVASI JALAN DAN JEMBATAN SUMBERJATI -


1 GENTENGKULON - JAJAG - SRONO - BANYUWANGI, SRONO - Konstruksi SYC 1 8.872.572.000 1 8.872.572.000 8.860.110.000 √ √ √ √ √ √ √ √ √ √ 69111064 1-Dec-20 11-Feb-21 Kontrak
MUNCAR

PEMBANGUNAN KALI TUWUH (PELURUSAN BRONGKOS - Evaluasi Administrasi,


3
KARANGKATES)
Konstruksi SYC 1 24.257.890.000 1 24.257.890.000 34.401.474.321 √ √ √ √ √ √ √ √ √ √ 70686064 15-Jan-21 12-Mar-21
Kualifikasi, Teknis, dan Harga

II SATKER PJN 2 JATIM 4 66.588.069.134 1 4.572.222.000 3 163.910.686.000 9 246.590.977.134 9 9 9 9 9 9 9 9 8 8

PPK 2.1 PROVINSI JAWA TIMUR 1 18.415.884.000 - - 1 67.678.402.000 2 86.094.286.000

PRESERVASI JALAN DAN JEMBATAN KERTOSONO - KEDIRI -


1
TULUNGAGUNG - JARAKAN (TRENGGALEK)
Konstruksi SYC 1 18.415.884.000 - - 1 18.415.884.000 18.401.044.000 √ √ √ √ √ √ √ √ √ √ 66088064 27-Oct-20 15-Jan-21 Kontrak

Download Dokumen
2 PEMBANGUNAN JALAN RINGINREJO - BTS. KAB. MALANG Konstruksi SYC - - 1 67.678.402.000 1 67.678.402.000 67.658.872.000 √ √ √ √ √ √ √ √ √ √ 71755064 11-Feb-21 2-Apr-21
Pemilihan

PPK 2.2 PROVINSI JAWA TIMUR 1 36.134.076.000 - - - - 2 47.654.076.000

PRESERVASI JALAN DAN JEMBATAN MANTINGAN - NGAWI -


1
MAOSPATI - MADIUN - CARUBAN
Konstruksi SYC 1 36.134.076.000 - - 1 36.134.076.000 36.116.926.000 √ √ √ √ √ √ √ √ √ √ 67021064 5-Nov-20 26-Jan-21 Kontrak

Sk Pokja tgl 25 feb , rencana


2 PEMBANGUNAN JEMBATAN GANTUNG DESA CERMO Cs Konstruksi SYC 1 11.520.000.000 √ √ √ √ √ √ √ √ SOP 4 tgl 26 feb 2020

PPK 2.3 PROVINSI JAWA TIMUR - - 1 4.572.222.000 - - 1 4.572.222.000

Evaluasi Administrasi,
PRESERVASI JALAN DAN JEMBATAN BTS KAB.PACITAN -
1
JARAKAN - PONOROGO - DENGOK - BTS KAB PONOROGO
Konstruksi SYC 1 4.572.222.000 1 4.572.222.000 4.561.582.000 √ √ √ √ √ √ √ √ √ √ 69105064 27-Nov-20 12-Mar-21 Kualifikasi, Teknis, dan Harga
(Tender Ulang)

PPK 2.4 PROVINSI JAWA TIMUR 1 10.314.020.134 - - - - 1 10.314.020.134

PRESERVASI JALAN DAN JEMBATAN GLONGGONG -


1
PACITAN - HADIWARNO - BTS KAB TRENGGALEK
Konstruksi SYC 1 10.314.020.134 - - 1 10.314.020.134 10.297.420.000 √ √ √ √ √ √ √ √ √ √ 66969064 6-Nov-20 7-Jan-21 Kontrak
Rencana Lelang Dini TA. 2021 READINESS CRITERIA BP2JK

Oktober November Desember Rencana


No Satker/Paket Pekerjaan Paket MYC/SYC Jumlah Paket Alokasi Nilai HPS SOP 1 SOP 2 SOP 3 SOP 4 SOP 5 Tayang SPSE Tahapan Lelang
Kontrak
ID SIRUP DED KAK HPS LAHAN Pengisian (Pengajuan ke (SK POKJA (pembahasan (Tayang di KODE SPSE
Jumlah Paket Alokasi Jumlah Paket Alokasi Jumlah Paket Alokasi SIPBJ + LPSE BP2JK) terbit) reviu POKJA LPSE)

PPK 2.5 PROVINSI JAWA TIMUR 1 1.724.089.000 - - 1 32.645.900.000 2 34.369.989.000

PRESERVASI JALAN DAN JEMBATAN POPOH - PRIGI -


1
PANGGUL
Konstruksi SYC 1 1.724.089.000 - - 1 1.724.089.000 1.715.198.993 √ √ √ √ √ √ √ √ √ √ 66858064 11-Nov-20 15-Jan-21 Kontrak

2 PEMBANGUNAN JALAN BRUMBUN -P. SINE Konstruksi SYC - - 1 32.645.900.000 1 32.645.900.000 32.628.750.000 √ √ √ √ √ √ √ √ √ √ 70598064 12-Jan-21 26-Mar-21 Upload Dokumen Penawaran

PPK 2.6 PROVINSI JAWA TIMUR - - - - 1 63.586.384.000 1 63.586.384.000

PRESERVASI JALAN DAN JEMBATAN NGAWI - CARUBAN - Download Dokumen


1
NGANJUK - KERTOSONO
Konstruksi UMYC - - 1 63.586.384.000 1 63.586.384.000 137.157.319.000 √ √ √ √ √ √ √ √ √ √ 71619064 10-Feb-21 30-Apr-21
Pemilihan
III SATKER PJN 3 JATIM - - 6 132.061.154.000 - - 7 139.741.154.000 6 6 6 6 6 6 6 6 6 6

PPK 3.1 PROVINSI JAWA TIMUR - - 1 34.700.989.000 - - 1 34.700.989.000

PRESERVASI JALAN TANJUNG BUMI - PAMEKASAN -


1
SUMENEP
Konstruksi SYC - 1 34.700.989.000 1 34.700.989.000 34.583.160.000 √ √ √ √ √ √ √ √ √ √ 69115064 30-Nov-20 10-Feb-21 Kontrak

PPK 3.2 PROVINSI JAWA TIMUR - - 1 45.412.736.000 - - 2 53.092.736.000

1 PRESERVASI JALAN KAMAL - BANGKALAN - KOTA SAMPANG Konstruksi SYC - 1 45.412.736.000 1 45.412.736.000 45.371.431.000 √ √ √ √ √ √ √ √ √ √ 69255064 1-Dec-20 23-Feb-21 Proses SPPBJ

2 Jembatan Gantung
2 PEMBANGUNAN JEMBATAN GANTUNG KAJJAN Cs Konstruksi SYC 1 7.680.000.000 Menjadi 1 Paket, Proses
Penyiapan Desain

PPK 3.3 PROVINSI JAWA TIMUR - - 1 8.451.525.000 - - 1 8.451.525.000

1 PRESERVASI JALAN SAMPANG - PAMEKASAN - SUMENEP Konstruksi SYC - 1 8.451.525.000 1 8.451.525.000 8.442.637.000 √ √ √ √ √ √ √ √ √ √ 69264064 1-Dec-20 15-Jan-21 Kontrak

PPK 3.4 PROVINSI JAWA TIMUR - - 1 8.839.454.000 - - 1 8.839.454.000

1 PRESERVASI JALAN SURABAYA - WARU Konstruksi SYC 1 8.839.454.000 1 8.839.454.000 8.828.856.000 √ √ √ √ √ √ √ √ √ √ 69226064 1-Dec-20 16-Feb-21 Kontrak

PPK 3.5 PROVINSI JAWA TIMUR - - 1 18.263.069.000 - - 1 18.263.069.000

PRESERVASI JALAN GEMPOL - BANGIL - PASURUAN - Evaluasi Administrasi,


1
PROBOLINGGO
Konstruksi SYC 1 18.263.069.000 1 18.263.069.000 18.252.477.000 √ √ √ √ √ √ √ √ √ √ 69408064 4-Dec-20 4-Mar-20
Kualifikasi, Teknis, dan Harga

PPK 3.6 PROVINSI JAWA TIMUR - - 1 16.393.381.000 - - 1 16.393.381.000

PRESERVASI JALAN SIDOARJO - PANDAAN - PURWOSARI -


1
MALANG - KEPANJEN
Konstruksi SYC 1 16.393.381.000 1 16.393.381.000 16.379.440.000 √ √ √ √ √ √ √ √ √ √ 69217064 1-Dec-20 11-Mar-20 Masa Sanggah

IV SATKER PJN 4 JATIM - - 5 138.232.602.000 3 222.157.016.000 9 368.069.618.000 8 8 8 8 8 8 8 8 6 6

PPK 4.1 PROVINSI JAWA TIMUR - - 1 42.314.795.000 - - 1 42.314.795.000

PRESERVASI JALAN DAN JEMBATAN WARU - SIDOARJO -


1
KRIAN
Konstruksi SYC 1 42.314.795.000 1 42.314.795.000 42.297.645.000 √ √ √ √ √ √ √ √ √ √ 69122064 30-Nov-20 26-Mar-20 Pembuktian Kualifikasi

PPK 4.2 PROVINSI JAWA TIMUR - - - - 1 73.777.285.000 2 81.457.285.000

PRESERVASI JALAN DAN JEMBATAN KERTOSONO -


1
JOMBANG - MOJOKERTO - GEMPOL
Konstruksi UMYC - - 1 73.777.285.000 1 73.777.285.000 √ √ √ √ √ √ √ √ SK Pokja tgl 25 feb 2020

2 Jembatan Gantung
PEMBANGUNAN JEMBATAN GANTUNG GONDANGMANIS
2 1 7.680.000.000 Menjadi 1 Paket, Proses
Cs
Penyiapan Desain

PPK 4.3 PROVINSI JAWA TIMUR - - 1 23.153.986.000 - - 1 23.153.986.000

PRESERVASI JALAN DAN JEMBATAN SURABAYA - GRESIK - Evaluasi Administrasi,


1
SADANG
Konstruksi SYC 1 23.153.986.000 1 23.153.986.000 23.139.146.000 √ √ √ √ √ √ √ √ √ √ 69449064 2-Dec-20 3-Mar-21
Kualifikasi, Teknis, dan Harga

PPK 4.4 PROVINSI JAWA TIMUR - - 1 14.574.198.000 - - 1 14.574.198.000

PRESERVASI JALAN DAN JEMBATAN BULU - TUBAN -


1
SADANG
Konstruksi SYC 1 14.574.198.000 1 14.574.198.000 14.561.738.000 √ √ √ √ √ √ √ √ √ √ 69104064 30-Nov-20 2-Mar-21 Masa sanggah

PPK 4.5 PROVINSI JAWA TIMUR - - - - 2 148.379.731.000 2 148.379.731.000

1 PRESERVASI JALAN TUBAN - BABAT - LAMONGAN - GRESIK Konstruksi UMYC - - 1 70.227.351.000 1 70.227.351.000 √ √ √ √ √ √ √ √ SK Pokja tgl 25 feb 2020

2 PEMBANGUNAN JALAN LINGKAR TUBAN Konstruksi SYC - - 1 78.152.380.000 1 78.152.380.000 78.130.470.000 √ √ √ √ √ √ √ √ √ √ 70940064 18-Jan-21 5-Mar-21 Upload Dokumen Penawaran

PPK 4.6 PROVINSI JAWA TIMUR - - 2 58.189.623.000 - - 2 58.189.623.000

PRESERVASI JALAN DAN JEMBATAN BABAT - BOJONEGORO Evaluasi Administrasi,


1
- PADANGAN - NGAWI
Konstruksi SYC 1 24.463.403.000 1 24.463.403.000 24.448.563.000 √ √ √ √ √ √ √ √ √ √ 69095064 30-Nov-20 26-Feb-21
Kualifikasi, Teknis, dan Harga

Evaluasi Administrasi,
2 PEMBANGUNAN JALAN DI KAB. BOJONEGORO BARAT Konstruksi SYC - 1 33.726.220.000 1 33.726.220.000 33.709.070.000 √ √ √ √ √ √ √ √ √ √ 70002064 18-Dec-20 17-Mar-21
Kualifikasi, Teknis, dan Harga
Rencana Lelang Dini TA. 2021 READINESS CRITERIA BP2JK

Oktober November Desember Rencana


No Satker/Paket Pekerjaan Paket MYC/SYC Jumlah Paket Alokasi Nilai HPS SOP 1 SOP 2 SOP 3 SOP 4 SOP 5 Tayang SPSE Tahapan Lelang
Kontrak
ID SIRUP DED KAK HPS LAHAN Pengisian (Pengajuan ke (SK POKJA (pembahasan (Tayang di KODE SPSE
Jumlah Paket Alokasi Jumlah Paket Alokasi Jumlah Paket Alokasi SIPBJ + LPSE BP2JK) terbit) reviu POKJA LPSE)

SATKER SKPD JATIM - - 1 13.017.723.000 - - 1 13.017.723.000 1 1 1 1 1 1 1 1 1 1

PPK SKPD PROVINSI JAWA TIMUR - - 1 13.017.723.000 - - 1 13.017.723.000

PRESERVASI JALAN DAN JEMBATAN TUREN - KEPANJEN -


1
BLITAR - TULUNGAGUNG
Konstruksi SYC 1 13.017.723.000 - 1 13.017.723.000 13.017.023.000 √ √ √ √ √ √ √ √ √ √ 68975064 27-Nov-20 29-Jan-21 Kontrak

SATKER P2JN JATIM 13 34.391.348.000 1 1.273.780.000 16 30.757.228.000 30 66.422.356.000 30 29 29 29 29 28 28 28 28 28

PPK PERENCANAAN P2JN PROVINSI JAWA TIMUR 1 6.500.000.000 - - 6 12.418.469.000 7 18.918.469.000

PR.01 PERENCANAAN TEKNIS PRESERVASI JALAN DAN


1
JEMBATAN SKPD-TP DAN WILAYAH I JAWA TIMUR
Konsultansi SYC - - 1 1.895.000.000 1 1.895.000.000 1.889.300.000 √ √ √ √ √ √ √ √ √ √ 69945064 6-Jan-21 17-Mar-21 Evaluasi Dokumen Kualifikasi

PR.02 PERENCANAAN TEKNIS PRESERVASI JALAN DAN


2
JEMBATAN WILAYAH II JAWA TIMUR
Konsultansi SYC - - 1 2.467.500.000 1 2.467.500.000 2.461.800.000 √ √ √ √ √ √ √ √ √ √ 69970064 6-Jan-21 17-Mar-21 Masa Sanggah Prakualifikasi

PR.03 PERENCANAAN TEKNIS PRESERVASI JALAN DAN


3
JEMBATAN WILAYAH III JAWA TIMUR
Konsultansi SYC - - 1 1.907.500.000 1 1.907.500.000 1.901.800.000 √ √ √ √ √ √ √ √ √ √ 69980064 6-Jan-21 17-Mar-21 Masa Sanggah Prakualifikasi

PR.04 PERENCANAAN TEKNIS PRESERVASI JALAN DAN


4
JEMBATAN WILAYAH IV JAWA TIMUR
Konsultansi SYC - - 1 2.130.000.000 1 2.130.000.000 2.124.300.000 √ √ √ √ √ √ √ √ √ √ 69982064 6-Jan-21 17-Mar-21 Masa Sanggah Prakualifikasi

5 PR.05 PERENCANAAN TEKNIS LONGSORAN JAWA TIMUR Konsultansi SYC - - 1 2.054.454.000 1 2.054.454.000 2.048.754.000 √ √ √ √ √ √ √ √ √ √ 69994064 6-Jan-21 17-Mar-21 Masa Sanggah Prakualifikasi

CT CORE TEAM PERENCANAAN DAN PENGAWASAN


6
PROVINSI JAWA TIMUR
Konsultansi SYC 1 6.500.000.000 - - 1 6.500.000.000 6.492.000.000 √ √ √ √ √ √ √ √ √ √ 66116064 27-Oct-20 10-Mar-20 Masa Sanggah

7 Paket Perencanaan Teknis Jembatan Jawa Timur Konsultansi SYC 1 1.964.015.000 1 1.964.015.000 1.958.315.000 √ √ √ √ √ √ √ √ √ √ 69998064 6-Jan-21 17-Mar-21 Masa Sanggah Prakualifikasi

PPK PENGAWASAN P2JN PROVINSI JAWA TIMUR 12 27.891.348.000 1 1.273.780.000 10 18.338.759.000 23 47.503.887.000

PW. W1.1 PENGAWASAN TEKNIS PRESERVASI JALAN


1 PROBOLINGGO - BANYUWANGI DAN PELEBARAN JALAN Konsultansi SYC 1 2.296.659.000 - - 1 2.296.659.000 2.290.959.000 √ √ √ √ √ √ √ √ √ √ 66052064 3-Nov-20 16-Feb-21 Kontrak
BAJULMATI - KETAPANG

PW. W1.2 PENGAWASAN TEKNIS PRESERVASI JALAN


2 WONOREJO - BANYUWANGI - KAWAH IJEN DAN Konsultansi SYC 1 2.265.522.000 - - 1 2.265.522.000 2.259.821.300 √ √ √ √ √ √ √ √ √ √ 67023064 5-Nov-20 27-Jan-21 Kontrak
PENANGANAN LERENG KALI JOMPO

PW. W1.3 PENGAWASAN TEKNIS PRESERVASI JALAN


3 PROBOLINGGO - TUREN - TULUNGAGUNG DAN PELEBARAN Konsultansi SYC 1 4.239.402.000 - - 1 4.239.402.000 4.232.551.400 √ √ √ √ √ √ √ √ √ √ 66310064 3-Nov-20 11-Feb-21 Kontrak
PROBOLINGGO - LUMAJANG

PW. W2.2 PENGAWASAN TEKNIS PRESERVASI JALAN


4
PACITAN - TRENGGALEK - PONOROGO
Konsultansi SYC 1 2.165.421.000 - - 1 2.165.421.000 2.159.720.200 √ √ √ √ √ √ √ √ √ √ 66329064 3-Nov-20 22-Feb-21 Kontrak

PW. W2.3 PENGAWASAN TEKNIS PRESERVASI JALAN


5
MANTINGAN - PONOROGO - MADIUN - KERTOSONO
Konsultansi SYC 1 2.626.982.000 - - 1 2.626.982.000 1.763.887.400 √ √ √ √ √ √ √ √ √ √ 67027064 5-Nov-20 26-Jan-21 Kontrak

PW. W2.4 PENGAWASAN TEKNIS PENANGANAN


6 LONGSORAN JAWA TIMUR DAN PELEBARAN MADIUN- Konsultansi SYC 1 868.995.000 - - 1 868.995.000 864.394.300 √ √ √ √ √ √ √ √ √ √ 67029064 5-Nov-20 15-Jan-21 Kontrak
CARUBAN

PW. W2.5 PENGAWASAN TEKNIS PRESERVASI JALAN


7
KERTOSONO - KEDIRI - TULUNGAGUNG - PRIGI - PANGGUL
Konsultansi SYC 1 1.777.005.000 - - 1 1.777.005.000 1.771.304.700 √ √ √ √ √ √ √ √ √ √ 66334064 3-Nov-20 15-Jan-21 Kontrak

PW. W2.6 PENGAWASAN TEKNIS PRESERVASI JALAN


8
NGAWI - KERTOSONO (MYC)
Konsultansi UMYC - 1 2.156.871.000 1 2.156.871.000 4.098.116.000 √ √ √ √ √ √ √ √ √ √ 71768064 16-Feb-21 30-Apr-21 Kirim Persyaratan Kualifikasi

PW. W3.1 PENGAWASAN TEKNIS PRESERVASI JALAN


9
BANGKALAN - SUMENEP - TANJUNGBUMI
Konsultansi SYC 1 3.347.121.000 - - 1 3.347.121.000 3.340.271.000 √ √ √ √ √ √ √ √ √ √ 66336064 3-Nov-20 26-Jan-21 Kontrak

PW. W3.2 PENGAWASAN TEKNIS PRESERVASI JALAN


10 SURABAYA - GEMPOL - PROBOLINGGO, PENGGANTIAN Konsultansi SYC 1 2.394.424.000 - - 1 2.394.424.000 2.388.723.700 √ √ √ √ √ √ √ √ √ √ 66337064 3-Nov-20 26-Jan-21 Kontrak
JEMBATAN KEDUNG ASEM

PW. W3.3 PENGAWASAN TEKNIS PRESERVASI JALAN


11 SURABAYA - MALANG - KEPANJEN DAN SPAM UMBULAN Konsultansi SYC 1 1.265.495.000 - - 1 1.265.495.000 1.259.794.800 √ √ √ √ √ √ √ √ √ √ 66145064 3-Nov-20 4-Mar-21 Masa sanggah
PASURUAN

PW. W4.1 PENGAWASAN TEKNIS JALAN WARU - KRIAN,


12 PELEBRAN JALAN JOMBANG - GRESIK DAN PENANGANAN Konsultansi SYC 1 2.697.628.000 - - 1 2.697.628.000 2.848.863.050 √ √ √ √ √ √ √ √ √ √ 67031064 5-Nov-20 15-Jan-21 Kontrak
DRAINASE JUANDA

PW. W4.2 PENGAWASAN TEKNIS JALAN TUBAN - GRESIK Download Dokumen


13
(MYC)
Konsultansi UMYC - 1 2.073.506.000 1 2.073.506.000 5.330.039.000 √ √ √ √ √ √ √ √ √ √ 71977064 24-Feb-20 5-May-20
Kualifikasi

PW. W4.3 PENGAWASAN TEKNIS PRESERVASI JALAN BULU -


14
SADANG - SURABAYA, NGAWI - BABAT - BUNDER
Konsultansi SYC 1 1.946.694.000 - - 1 1.946.694.000 3.070.745.700 √ √ √ √ √ √ √ √ √ √ 67030064 5-Nov-20 11-Feb-21 Kontrak
Rencana Lelang Dini TA. 2021 READINESS CRITERIA BP2JK

Oktober November Desember Rencana


No Satker/Paket Pekerjaan Paket MYC/SYC Jumlah Paket Alokasi Nilai HPS SOP 1 SOP 2 SOP 3 SOP 4 SOP 5 Tayang SPSE Tahapan Lelang
Kontrak
ID SIRUP DED KAK HPS LAHAN Pengisian (Pengajuan ke (SK POKJA (pembahasan (Tayang di KODE SPSE
Jumlah Paket Alokasi Jumlah Paket Alokasi Jumlah Paket Alokasi SIPBJ + LPSE BP2JK) terbit) reviu POKJA LPSE)

PW. W4.4 PENGAWASAN TEKNIS PRESERVASI KERTOSONO - Tahap persetujuan ijin


15
MOJOKERTO (MYC)
Konsultansi UMYC - 1 2.933.525.000 1 2.933.525.000 √ √ √ √ √ prinsip untuk lelang/seleksi

PW. PENGAWASAN TEKNIS PEMBANGUNAN JEMBATAN


16
KALI TUWUH (Pelurusan Brongkos - Karangkates)
Konsultansi SYC - - 1 977.110.000 1 977.110.000 972.510.000 √ √ √ √ √ √ √ √ √ √ 67938064 16-Nov-02 22-Mar-21 Penetapan Hasil Kualifikasi

PW. PENGAWASAN TEKNIS PEMBANGUNAN JALAN KAB


17
BOJONEGORO
Konsultansi UMYC - 1 1.273.780.000 1 1.273.780.000 √ √ √ √ √ √ √ √ √ √ 68062064 16-Nov-02 11-Feb-21 Kontrak

PW PAKET PENGAWASAN TEKNIS PEMBANGUNAN JALAN


18
LINGKAR TUBAN
Konsultansi SYC - - 1 1.847.620.000 1 1.847.620.000 1.841.919.200 √ √ √ √ √ √ √ √ √ √ 67963064 16-Nov-02 11-Feb-21 Kontrak

PW. PENGAWASAN TEKNIS PEMBANGUNAN JALAN Download Dokumen


19
RINGINREJO - BTS. KAB. MALANG
Konsultansi SYC - - 1 2.321.598.000 1 2.321.598.000 2.021.954.000 √ √ √ √ √ √ √ √ √ √ 71988064 24-Feb-20 5-May-20
Kualifikasi

PW PAKET PENGAWASAN TEKNIS PEMBANGUNAN JALAN


20
SUMBEREJO - SIDODADI
Konsultansi SYC - - 1 1.870.214.000 1 1.870.214.000 1.864.513.200 √ √ √ √ √ √ √ √ √ √ 68011064 16-Nov-02 11-Feb-21 Kontrak

PW PW PAKET PENGAWASAN TEKNIS PEMBANGUNAN


21 JALAN BTS. BLITAR/MALANG - SP 5 PURWODADI (STA Konsultansi SYC - - 1 1.599.915.000 1 1.599.915.000 1.594.214.600 √ √ √ √ √ √ √ √ √ √ 68012064 16-Nov-02 11-Feb-21 Kontrak
6+150 - 11+150)

PW PAKET PENGAWASAN TEKNIS PEMBANGUNAN JALAN


22
BRUMBUN - P. SINE
Konsultansi SYC - - 1 1.278.400.000 1 1.278.400.000 1.272.700.000 √ √ √ √ √ √ √ √ √ √ 67936064 16-Nov-02 11-Feb-21 Kontrak

PAKET PENGAWASAN JEMBATAN GANTUNG JAWA TIMUR


23
CS
Konsultansi SYC - 1 1.280.000.000 1 1.280.000.000 √ Penyusunan KAK

SATKER BBPJN 1 5.500.000.000 2 13.966.603.000 2 2.500.000.000 5 21.966.603.000 4 4 4 4 4 4 4 4 4 4

PPK TATA USAHA 1 5.500.000.000 - - - - 1 5.500.000.000

Pembukaan dan Evaluasi


1 KONSULTAN MANAJEMEN PROYEK BBPJN JATIM BALI Konsultansi SYC 1 5.500.000.000 - - 1 5.500.000.000 5.488.570.000 √ √ √ √ √ √ √ √ √ √ 69506064 11-Dec-20 1o mar 2020 Penawaran File I:
Administrasi dan Teknis

PPK PERENCANAAN DAN PEMANTAUAN - - 2 13.966.603.000 2 2.500.000.000 4 16.466.603.000

SURVEI KONDISI JALAN, LERENG DAN JEMBATAN PROVINSI Download Dokumen


1
JAWA TIMUR
Konsultansi SYC - 1 9.249.243.000 - 1 9.249.243.000 9.237.813.000 √ √ √ √ √ √ √ √ √ √ 69199064 10-Dec-20 2 6 mar 2020
Pemilihan

SURVEI KONDISI JALAN, LERENG DAN JEMBATAN PROVINSI


2
BALI
Konsultansi SYC - 1 4.717.360.000 - 1 4.717.360.000 4.707.550.000 √ √ √ √ √ √ √ √ √ √ 69203064 10-Dec-20 31-Mar-20 Pembuktian Kualifikasi

REVIEW PENYUSUNAN DOKUMEN LINGKUNGAN HIDUP Paket rencana di batalkan


3 Konsultansi SYC - - 1 1.500.000.000 1 1.500.000.000
ALOHA akan dialihkan ke Paket ESP

PENYUSUNAN DOKUMEN ANDALALIN PROVINSI JAWA Download Dokumen


4
TIMUR DAN BALI
Konsultansi SYC - - 1 1.000.000.000 1 1.100.000.000 1.030.150.000 √ √ √ √ √ √ √ √ √ √ 71564064 5-Feb-21 19-Apr-21
Kualifikasi

SATKER SURAMADU 1 2.701.260.000 2 8.023.891.000 - - 4 17.355.891.000 4 4 4 4 4 4 4 4 4 4

PPK JEMBATAN SURAMADU 1 PROVINSI JAWA TIMUR 1 2.701.260.000 2 8.023.891.000 - - 3 10.725.151.000

PEMERIKSAAN DETAIL DAN PERENCANAAN JEMBATAN Upload Dokumen


1
SURAMADU
Konstruksi SYC - 1 5.020.000.000 - 1 5.020.000.000 5.011.110.000 √ √ √ √ √ √ √ √ √ √ 69133064 11-Dec-20 17-Mar-21
Penawaran

Download Dokumen
2 JASA OPERASIONAL SMKS JEMBATAN SURAMADU Konstruksi SYC - 1 3.003.891.000 - 1 3.003.891.000 2.996.194.850 √ √ √ √ √ √ √ √ √ √ 70761064 7-Jan-21 16-Mar-21
Pemilihan

3 SUPERVISI PEMELIHARAAN RUTIN JEMBATAN SURAMADU Konstruksi SYC 1 2.701.260.000 - - 1 2.701.260.000 2.691.628.500 √ √ √ √ √ √ √ √ √ √ 67831064 13-Nov-20 28-Jan-21 Kontrak

PPK JEMBATAN SURAMADU 2 PROVINSI JAWA TIMUR 8 68.103.119.000 5 116.393.704.000 8 230.783.949.000 1 6.630.740.000

PRESERVASI REHABILITASI JALAN BARU (AKSES Evaluasi Administrasi,


1
SURAMADU)
1 6.630.740.000 6.618.280.000 √ √ √ √ √ √ √ √ √ √ 70790064 15-Jan-21 12-Mar-21
Kualifikasi, Teknis, dan Harga

PROVINSI BALI 8 68.103.119.000 3 63.638.207.000 7 187.018.332.000 20 319.521.658.000 16 16 16 16 16 16 16 16 16 16

PJN 1 BALI - - 2 52.755.497.000 1 43.765.617.000 5 97.283.114.000 3 3 3 3 3 3 3 3 3 3

PPK 1.1 PROVINSI BALI - - 1 18.104.350.000 - - 2 18.146.350.000

PRESERVASI JALAN DAN JEMBATAN GILIMANUK -


1
CEKIK - SERIRIT - BTS. KOTA SINGARAJA
Konstruksi SYC - 1 18.104.350.000 - 1 18.104.350.000 18.051.750.000 √ √ √ √ √ √ √ √ √ √ 68974064 27-Nov-20 8-Feb-21 Kontrak

kebutuhan dana 5,7 M


namun alokasi dana 2021 42
2 Preservasi Jembatan Tk. Batu Pulu 1 42.000.000
Jt, sehingga menunggu sisa
lelang
Rencana Lelang Dini TA. 2021 READINESS CRITERIA BP2JK

Oktober November Desember Rencana


No Satker/Paket Pekerjaan Paket MYC/SYC Jumlah Paket Alokasi Nilai HPS SOP 1 SOP 2 SOP 3 SOP 4 SOP 5 Tayang SPSE Tahapan Lelang
Kontrak
ID SIRUP DED KAK HPS LAHAN Pengisian (Pengajuan ke (SK POKJA (pembahasan (Tayang di KODE SPSE
Jumlah Paket Alokasi Jumlah Paket Alokasi Jumlah Paket Alokasi SIPBJ + LPSE BP2JK) terbit) reviu POKJA LPSE)

PPK 1.2 PROVINSI BALI - - 1 34.651.147.000 1 43.765.617.000 3 79.136.764.000

PRESERVASI JALAN CEKIK - BTS. KOTA NEGARA -


1
PEKUTATAN - ANTOSARI - BTS. KOTA TABANAN
Konstruksi SYC - 1 34.651.147.000 - 1 34.651.147.000 34.651.147.000 √ √ √ √ √ √ √ √ √ √ 68861064 24-Nov-20 15-Jan-20 Kontrak

JEMBATAN SHORTCUT DENPASAR - GILIMANUK (TK. Evaluasi Administrasi,


2
YEH OTAN)
Konstruksi MYC - - 1 43.765.617.000 1 43.765.617.000 82.087.950.000 √ √ √ √ √ √ √ √ √ √ 71085064 18-Jan-21 25-Mar-21
Kualifikasi, Teknis, dan Harga

kebutuhan dana 5,12 M


(penanganan jembatan
3 Preservasi Jalan Cekik - Bts Kota Negara 1 720.000.000 bentang < 6 m)namum
alokasi 720 JT sehingga
menunggu sisa lelang

PJN 2 BALI 2 29.782.191.000 - - - - 2 29.782.191.000 2 2 2 2 2 2 2 2 2 2

PPK 2.1 PROVINSI BALI 1 23.866.231.000 - - - - 1 23.866.231.000

PRESERVASI JALAN DAN JEMBATAN RUAS JALAN


1 DALAM KOTA SINGARAJA-KUBUTAMBAHAN-BTS. Konstruksi SYC 1 23.866.231.000 1 23.866.231.000 23.855.631.000 √ √ √ √ √ √ √ √ √ √ 67179064 6-Nov-20 15-Jan-21 Kontrak
KOTA AMLAPURA

PPK 2.2 PROVINSI BALI 1 5.915.960.000 - - - - 1 5.915.960.000

PRESERVASI JALAN RUAS JALAN KLUNGKUNG -


PENELOKAN, SAKAH - UBUD, TEGES - ISTANA
1
PRESIDEN, KLUNGKUNG - PADANGBAI, ANGENTELU -
Konstruksi SYC 1 5.915.960.000 - - 1 5.915.960.000 5.907.059.480 √ √ √ √ √ √ √ √ √ √ 66985064 5-Nov-20 28-Dec-21 Kontrak

JLN. UNTUNG SURAPATI (AMLAPURA)

PJN 3 BALI 1 25.559.307.000 1 10.882.710.000 2 135.000.000.000 4 171.442.017.000


3 3 3 3 3 3 3 3 3 3

PPK 3.1 PROVINSI BALI 1 25.559.307.000 - - - - 1 25.559.307.000

PRESERVASI JALAN SP. KEDIRI - BTS. KOTA SINGARAJA,


1
MENGWITANI - DALAM KOTA DENPASAR
Konstruksi SYC 1 25.559.307.000 - - 1 25.559.307.000 25.547.057.000 √ √ √ √ √ √ √ √ √ √ 67837064 11-Nov-20 15-Jan-21 Kontrak

PPK 3.2 PROVINSI BALI - - 1 10.882.710.000 1 40.000.000.000 2 50.882.710.000

PRESERVASI JALAN DAN JEMBATAN SP.


1 COKROAMONOTO - KOSAMBA, SP. TOHPATI - NUSA Konstruksi SYC 1 10.882.710.000 - 1 10.882.710.000 10.872.109.293 √ √ √ √ √ √ √ √ √ √ 69195064 30-Nov-20 4-Feb-21 Kontrak
DUA, JIMBARAN - ULUWATU

PENGGANTIAN JEMBATAN RUAS SP. COKROAMINOTO Evaluasi Administrasi,


2
- SP. TOHPATI (JLN. G. SUBROTO TIMUR)
Konstruksi UMYC - - - 1 40.000.000.000 1 40.000.000.000 138.322.062.980 √ √ √ √ √ √ √ √ √ √ 71028064 15-Jan-21 25-Mar-21
Kualifikasi, Teknis, dan Harga

PPK 3.3 PROVINSI BALI - - - - 1 95.000.000.000 1 95.000.000.000

PEMBANGUNAN JALAN BARU BTS. KOTA SINGARAJA -


1 Konstruksi UMYC - - 1 95.000.000.000 1 95.000.000.000 Proses RPB Tingkat Balai
MENGWITANI (TITIK 7A,7B,7C dan 8)

SKPD BALI 1 2.047.437.000 - - - - 1 2.047.437.000 1 1 1 1 1 1 1 1 1 1

PPK SKPD-TP PROVINSI BALI 1 2.047.437.000 - - - - 1 2.047.437.000

PRESERVASI JALAN DAN JEMBATAN SP. TOHPATI -


1 JALAN. UNTUNG SURAPATI, FLAMBOYAN Konstruksi SYC 1 2.047.437.000 - - 1 2.047.437.000 2.041.086.974 √ √ √ √ √ √ √ √ √ √ 66447064 20-Oct-20 15-Jan-20 Kontrak
(SEMARAPURA) (EFEKTIF )
SATKER P2JN BALI 4 10.714.184.000 - - 4 8.252.715.000 8 18.966.899.000 7 7 7 7 7 7 7 7 7 7

PPK PERENCANAAN P2JN PROVINSI BALI 1 3.551.064.000 - - 1 2.903.000.000 2 6.454.064.000

1 PAKET 5 CORE TEAM P2JN PROVINSI BALI Konsultan SYC 1 3.551.064.000 - - 1 3.551.064.000 3.545.614.000 √ √ √ √ √ √ √ √ √ √ 66712064 3-Nov-20 15-Jan-21 Kontrak 15 jan 201

PAKET 1 PERENCANAAN LONG SEGMENT, DRAINASE,


2
TROTOAR DAN LONGSORAN
Konsultan - - 1 2.903.000.000 1 2.903.000.000 2.897.550.000 √ √ √ √ √ √ √ √ √ √ 69859064 23-Dec-20 24-Mar-21 Upload Dokumen Penawaran

PPK PENGAWASAN P2JN PROVINSI BALI 3 7.163.120.000 - - 3 5.349.715.000 6 12.512.835.000

PAKET 2 PENGAWASAN TEKNIK JALAN DAN


1
JEMBATAN WILAYAH 1 PROVINSI BALI (PW 1)
Konsultan SYC 1 2.006.209.000 - - 1 2.006.209.000 2.001.659.000 √ √ √ √ √ √ √ √ √ √ 66393064 26-Oct-20 5-Jan-21 Kontrak

PAKET 3 PENGAWASAN TEKNIK JALAN DAN


2
JEMBATAN WILAYAH 2 PROVINSI BALI (PW 2)
Konsultan SYC 1 2.213.075.000 - - 1 2.213.075.000 2.208.525.000 √ √ √ √ √ √ √ √ √ √ 66420064 26-Oct-20 6-Jan-21 Kontrak

PAKET 4 PENGAWASAN TEKNIK JALAN DAN


3 JEMBATAN WILAYAH 3 PROVINSI BALI DAN SKPD TP Konsultan SYC 1 2.943.836.000 - - 1 2.943.836.000 2.938.386.000 √ √ √ √ √ √ √ √ √ √ 66394064 26-Oct-20 5-Jan-21 Kontrak
DPUPR PROVINSI BALI (PW 3)

PAKET 6 PENGAWASAN TEKNIK PENGGANTIAN


4 JEMBATAN PADA RUAS SP. COKROAMINOTO - SP. Konsultan UMYC - - 1 2.204.322.000 1 2.204.322.000 4.754.060.000 √ √ √ √ √ √ √ √ √ √ 71092064 18-Jan-21 9-Apr-21 Masa Sanggah Prakualifikasi
TOHPATI (JLN. G. SUBROTO TIMUR) (PW 4) (MYC)

PAKET 7 PENGAWASAN TEKNIS PEMBANGUNAN


Menunggu Kesiapan Paket
5 JALAN BARU BTS. KOTA SINGARAJA - MENGWITANI Konsultan UMYC - - 1 1.911.010.000 1 1.911.010.000
Fisik
TITIK 7A, 7B, 7C DAN TITIK 8 (PW 5) (MYC)

PAKET 8 PENGAWASAN TEKNIS PEMBANGUNAN


6
JEMBATAN YEH OTAN (PW 6) (MYC)
Konsultan UMYC - - 1 1.234.383.000 1 1.234.383.000 2.604.000.000 √ √ √ √ √ √ √ √ √ √ 71051064 18-Jan-21 31-Mar-21 Evaluasi Dokumen Kualifikasi
REKAPITULASI PAKET BELUM LELANG TA.2021 BBPJN JAWA TIMUR - BALI

1
PRESERVASI JALAN DAN JEMBATAN SITUBONDO - KETAPANG -
1 Konstruksi SYC 1 19.524.287.000 19.505.891.000 1-Dec-20 26-Feb-21 Proses PAM Tanggal 15 Februari 2021
BANYUWANGI
PRESERVASI JALAN DAN JEMBATAN PROBOLINGGO - LUMAJANG -
3 Konstruksi SYC 1 21.737.931.000 21.723.089.000 2-Dec-20 9-Mar-20 Masa Sanggah
TUREN

12 PRESERVASI JALAN KAMAL - BANGKALAN - KOTA SAMPANG Konstruksi SYC 1 45.412.736.000 45.371.431.000 1-Dec-20 23-Feb-21 Proses SPPBJ

PRESERVASI JALAN SIDOARJO - PANDAAN - PURWOSARI - MALANG


15 Konstruksi SYC 1 16.393.381.000 16.379.440.000 1-Dec-20 11-Mar-20 Masa Sanggah
- KEPANJEN

18 PRESERVASI JALAN DAN JEMBATAN BULU - TUBAN - SADANG Konstruksi SYC 1 14.574.198.000 14.561.738.000 30-Nov-20 2-Mar-21 Masa sanggah

CT CORE TEAM PERENCANAAN DAN PENGAWASAN PROVINSI


22 Konsultansi SYC 1 6.500.000.000 6.492.000.000 27-Oct-20 10-Mar-20 Masa Sanggah
JAWA TIMUR
PW. W3.3 PENGAWASAN TEKNIS PRESERVASI JALAN SURABAYA -
24 Konsultansi SYC 1 1.265.495.000 1.259.794.800 3-Nov-20 4-Mar-21 Masa sanggah
MALANG - KEPANJEN DAN SPAM UMBULAN PASURUAN