PRESERVASI REKONSTRUKSI JALAN ARTERI BARAT - REKONSTRUKSI KRIAN - TAMAN (BY PASS KRIAN - TAMAN)
2 37,668,231,000 83.92
ARTERI UTARA SBY - LEGUNDI - BUNDER - SIDOARJO Km. SBY 18+600-19+900, Km. SBY 20+396-21+096
PPK 26 PJN Kamal-Bangkalan-Kota Sampang (Nuruddin Pujoartanto, ST, MT-0813 3654 8896)
PRESERVASI DAN PELEBARAN JALAN KAMAL - PELEBARAN BANGKALAN - PELABUHAN TANJUNG BUMI
3 23,496,360,000 144.15
BANGKALAN - KOTA SAMPANG Km. KML 21+650-22+650, Km. KML 23+400-24+800
PPK 27 PJN Sampang-Pamekasan-Sumenep (Ely Sunaryo, ST, M.MT-0813 5420 5507)
PELEBARAN BTS. KAB. PAMEKASAN - BTS. KOTA SUMENEP
Km. KML 157+435-158+045
PRESERVASI DAN PELEBARAN JALAN SAMPANG -
4 22,484,750,000 178.63 PELEBARAN BTS. KAB. PAMEKASAN - BTS. KOTA SUMENEP
PAMEKASAN - SUMENEP
SOTABAR - BTS. KAB. PAMEKASAN/SUMENEP
Km. KML 134+000-134+680
TOTAL JALAN 132,978,771,000 499.91
PPK 27 PJN Sampang-Pamekasan-Sumenep (Ely Sunaryo, ST, M.MT-0813 5420 5507)
PENGGANTIAN JEMBATAN PENANGGUNG Km. KML 100+120
5 PAKET PENGGANTIAN JEMBATAN GANGSEAN CS 22,411,471,000 77.80 PENGGANTIAN JEMBATAN GANGSEAN Km.KML 105+010
PENGGANTIAN JEMBATAN DINGIN Km. KML 103+030
PENGGANTIAN JEMBATAN PAKAMBAN
6 PAKET PENGGANTIAN JEMBATAN PAKAMBAN 7,500,000,000 30.40
Km. KML 133+840
PPK 21 PJN Tanjung Bumi-Pamekasan-Sumenep (Zulkifli Arif, ST-0813 3078 1179)
PENGGANTIAN JEMBATAN BATU LENGER
7 PAKET PENGGANTIAN JEMBATAN TEPOH CS 8,602,230,000 38.60 Km.KML 096+050
PENGGANTIAN JEMBATAN TEPOH, Km. KML 130+200
Penggantian Jembatan MASARAN, Km. KML 093+250
PENANGANAN TAHUN ANGGARAN 2017 BIDANG PRESE
Status: 20 Januari 2017
Efektif
Pagu Total Panjang
NO Nama Paket
(Rp) (Km/m) Lokasi
10 PAKET PEMBANGUNAN BANYUURIP (SURABAYA) 6,000,000,000 0.10 PAKET PEMBANGUNAN BANYUURIP (SURABAYA)
PPK 13 PJN KERTOSONO - KEDIRI - TULUNGAGUNG - JARAKAN (TRENGGALEK) (Ir. Sudibya Wignyajaya, MT-0818 797 301)
PRESERVASI REKONSTRUKSI JALAN KERTOSONO - Paket Rekonstruksi (Jarakan) Trenggalek - Bts. Kab. Tulungagung
1 21,991,933,000 1113.88
KEDIRI - TULUNGAGUNG - JARAKAN (TRENGGALEK) Km Sby 176+050-177+000 dan 180+200-180+250
PPK 15 PJN MANTINGAN - NGAWI - MAOSPATI - PONOROGO - MADIUN - CARUBAN (Novia Endhianata, ST, M.MT-0852 2940 3334)
PRESERVASI REKONSTRUKSI JALAN MANTINGAN - Paket Rekonstruksi Jalan Mantingan (Bts. Prov. Jateng) - Bts.
2 NGAWI - MAOSPATI - MADIUN - CARUBAN - 38,337,777,000 920.75 Kota. Ngawi
PONOROGO Km Sby 191+700-192+900 dan 202+900-202+400
PPK 17 PJN BTS. KAB. PACITAN - JARAKAN (TRENGGALEK) - PONOROGO - DENGOK - BTS. KAB. PONOROGO (Ir. Moch. Faried, MM-0822 3380 9996)
PPK 18 PJN GLONGGONG - PACITAN - HADIWARNO - BTS KAB.TRENGGALEK (Sifa Udukha, ST, MT-0813 3652 7791)
PPK 20 PJN POPOH - PRIGI - PANGGUL (Robert Himawan Hamiseno, ST, MT-0811 310 589)
PENANGANAN TAHUN ANGGARAN 2017 BIDANG PRESE
Status: 20 Januari 2017
Efektif
Pagu Total Panjang
NO Nama Paket
(Rp) (Km/m) Lokasi
5 PRESERVASI JALAN POPOH - PRIGI - PANGGUL 5,854,634,000 831.56 -
PPK 32 PJN NGAWI - CARUBAN - NGANJUK - KERTOSONO (Waskita Wicaksonoadi, ST-0813 3022 0451)
Paket Rekonstruksi Jalan Dr. Ir. H. Soekarno (Ngawi) (028.15K)
Km Sby 177+400-178+700
PRESERVASI REKONSTRUKSI JALAN NGAWI -
6 39,441,621,000 1595.94
CARUBAN - NGANJUK - KERTOSONO Paket Rehabilitasi Mayor Jalan Lingkar Nganjuk
Km Sby 117+700-118+316
Km Sby 120+506-120+690
TOTAL PRESERVASI JALAN 139,194,366,000 6,478.29
PPK 13 PJN KERTOSONO - KEDIRI - TULUNGAGUNG - JARAKAN (TRENGGALEK) (Ir. Sudibya Wignyajaya, MT-0818 797 301)
7 PEMBANGUNAN JEMBATAN NGADILUWIH (MYC) 41,000,000,000 180.00
PPK 15 PJN MANTINGAN - NGAWI - MAOSPATI - PONOROGO - MADIUN - CARUBAN (Novia Endhianata, ST, M.MT-0852 2940 3334)
8 PEMBANGUNAN JEMBATAN DADUNG 10,036,180,000 25.00 Km Sby 214+000
PPK 17 PJN BTS. KAB. PACITAN - JARAKAN (TRENGGALEK) - PONOROGO - DENGOK - BTS. KAB. PONOROGO (Ir. Moch. Faried, MM-0822 3380 9996)
9 PEMBANGUNAN JEMBATAN NGUJANG II (MYC) 86,000,000,000 85.00
10 PEMBANGUNAN JEMBATAN GANTUNG PARAKAN 1,500,000,000 36.00
PPK 18 PJN GLONGGONG - PACITAN - HADIWARNO - BTS KAB.TRENGGALEK (Sifa Udukha, ST, MT-0813 3652 7791)
PPK 20 PJN POPOH - PRIGI - PANGGUL (Robert Himawan Hamiseno, ST, MT-0811 310 589)
Efektif Rutin
Panjang Panjang Rencana TTD
Proses Lelang
Penanganan Pagu (Rp) Lokasi Pagu Penanganan Kontrak
(Km/m) (Km/m)
2.60 26,025,000,000
Ruas Jalan Sadang-Gresik-Arteri Tengah Evaluasi Dokumen 10 Februari
9,304,430,000 89.51
Surabaya-Arteri Timur Surabaya Penawaran 2017
1.10 14,000,000,000
0.61 5,000,000,000
Evaluasi Dokumen 22 Februari
Ruas Jalan Sampang-Pamekasan-Sumenep 11,984,750,000 177.34
(Lelang Ulang) 2017
0.68 5,500,000,000
26.60 6,369,990,000
Evaluasi Dokumen
26.60 10,235,610,000 - - -
Penawaran 10 Februari
24.60 5,805,871,000 2017
Evaluasi Dokumen 10 Februari
30.40 7,500,000,000 - - -
Penawaran 2017
Efektif Rutin
Panjang Panjang Rencana TTD
Proses Lelang
Penanganan Pagu (Rp) Lokasi Pagu Penanganan Kontrak
(Km/m) (Km/m)
34.60 8,477,000,000
- - - Belum lelang -
16.80 5,400,000,000
0.25 1,586,140,000
Ruas Jalan Tuban-Babat-Lamongan-Gresik
0.22 1,586,140,000 (Km Sby 016+400 - 42+025,
42+975 - 42+985,
Evaluasi Dokumen 13 Februari
2.60 20,709,730,000 43+855-48+500, 7,161,621,000 83.24
Penawaran 201
50+400-101+530,
0.88 6,415,680,000 102+000-106+870)
0.96 12,318,110,000
Efektif Rutin
Panjang Panjang Rencana TTD
Proses Lelang
Penanganan Pagu (Rp) Lokasi Pagu Penanganan Kontrak
Rutin Jalan Kertosono-Jombang-Mojokerto-
(Km/m) Gempol (Km. Mjs 0+350 - 11+700, (Km/m)
12+700 - 18+375; Evaluasi Dokumen 13 Februari
1.00 8,500,000,000 9,061,019,000 99.92
Km. Gpl 0+000 - 03+600; Penawaran 201
Km. Sby 33+800 - 37+500,
0.50 2,900,000,000 39+500 - 63+000, 63+500 - 95+550)
Efektif Rutin
Panjang Panjang Rencana TTD
Proses Lelang
Penanganan Pagu (Rp) Lokasi Pagu Penanganan Kontrak
(Km/m) (Km/m)
Efektif Rutin
Panjang Panjang Rencana TTD
Proses Lelang
Penanganan Pagu (Rp) Lokasi Pagu Penanganan Kontrak
(Km/m) (Km/m)
- -
Pemeliharaan Rutin Jembatan Ruas Popoh
2,232,600,000 744.20
- Prigi - Panggul
180.00 41,000,000,000
25.00 10,036,180,000
380 9996)
85.00 86,000,000,000
36.00 1,500,000,000
160.00 2,800,000,000
250.00 97,000,000,000
736.00 238,336,180,000
0.32 3,500,000,000
N 2017 BIDANG PRESERVASI DAN PERALATAN I
Efektif Rutin
Panjang Panjang Rencana TTD
Proses Lelang
Penanganan Pagu (Rp) Lokasi Pagu Penanganan Kontrak
(Km/m) (Km/m)
0.24 3,500,000,000
0.56 7,000,000,000.00