Anda di halaman 1dari 77

SNVT PELAKSANAAN JARINGAN PEMANFAATAN AIR

( PJPA ) SERAYU OPAK


KEGIATAN IRIGASI DAN RAWA - II
TAHUN ANGGARAN 2017 - 2019

REHABILITASI JARINGAN IRIGASI


DI PROGOMANGGIS
Nomor Kontrak : 10/PKK/PJPA.SO/2017
Tanggal : 28 Juli 2017

HITUNGAN QUANTITY

MC - 100

PEKERJAAN : REHABILITASI SALURAN


NAMA STRUKTUR : LINING BETON BERTULANG
LOKASI : SALURAN DRAINASE
INDUK PROGOMANGGIS
(Hm.142+11)

KONSULTAN SUPERVISI :

PT. WAHANA KRIDA KONSULINDO

Lina Building, Jl. H.R Rasuna Said Kav. B-7 Kuningan Jakarta Selatan
Phone ; 021-5255401 , Fax. : 021-5254469, 5254023
E-mail : sacna@cbn.net.id ; sacnas@pu.go.id
SNVT PELAKSANAAN JARINGAN PEMANFAATAN AIR
( PJPA ) SERAYU OPAK
KEGIATAN IRIGASI DAN RAWA - II
TAHUN ANGGARAN 2017 - 2019

REHABILITASI JARINGAN IRIGASI


DI PROGOMANGGIS
Nomor Kontrak : 10/PKK/PJPA.SO/2017
Tanggal : 28 Juli 2017

HITUNGAN QUANTITY

TERMYN - 08

PEKERJAAN : REHABILITASI BENDUNG


NAMA STRUKTUR : LINING IN SITU KANTONG LUMPUR
TYPE-03
LOKASI : BENDUNG BADRAN

KONSULTAN SUPERVISI :

PT. WAHANA KRIDA KONSULINDO

Lina Building, Jl. H.R Rasuna Said Kav. B-7 Kuningan Jakarta Selatan
Phone ; 021-5255401 , Fax. : 021-5254469, 5254023
E-mail : sacna@cbn.net.id ; sacnas@pu.go.id
PT. SAC NUSANTARA
REHABILITASI JARINGAN IRIGASI DI PROGOMANGGIS

REKAPITULASI VOLUME MC - 100


Pekerjaan : REHABILITASI JARINGAN IRIGASI DI PROGOMANGGIS
Item Pembayaran : PEKERJAAN TANAH DAN BETON
Uraian Kegiatan : PEKERJAAN TANAH DAN BETON

NO. URAIAN SATUAN VOLUME KETERANGAN

II PEKERJAAN TANAH
1 Galian tanah biasa dengan alat berat (mekanis) m3 612.18
2 Galian tanah cadas dengan alat berat m3 -
3 Galian tanah biasa diangkut sejauh 10 m m3 -
4 Timbunan tanah mendatangkan dipadatkan menggunakan Vibro roller m3 -
5 Timbunan tanah atau Urugan tanah kembali manual m3 326.17
6 Pemadatan tanah menggunakan Vibro roller m3 -
7 Pemadatan tanah menggunakan stemper m3 326.17
8 Tebas Tebang dan Pembersihan Lokasi m2 -
9 Memuat Material/Hasil Galian ke Dump Truck m3 -
10 Mengangkut 1m3 Material/Hasil galian dgn jarak angkut 50 m m3 -
11 DT Angkut Material/Hasil galian dgn jarak angkut 100 m m3 -
12 DT Angkut Material/Hasil galian dgn jarak angkut 750 m m3 -
13 DT Angkut Material/Hasil galian dgn jarak angkut 3.0 km m3 -
14 DT Angkut Material/Hasil galian dgn jarak angkut 5.0 km m3 -

V PEKERJAAN BETON
1 Beton mutu f'c = 26,4 Mpa m3 -
2 Beton mutu f'c = 19,3 Mpa m3 -
3 Beton mutu f'c = 14,5 Mpa m3 186.25
4 Pembesian 100 kg dengan besi polos atau ulir untuk pembesian plat kg 8,409.76
5 Bekisting lantai beton biasa dgn multiplex 12 mm atau 18 mm (dipakai 3 x) m2 -
6 Bekisting dinding beton biasa dgn multiplex 12 mm atau 18 mm (TP) (dipakai 3 x) m2 984.87
7 Bongkar pasangan batu m3 -
8 Pengadaan dan pemasangan beton precast :
a. Beton precast f'c 26,4 Mpa untuk segmen 1 m m3 -
b. Beton precast f'c 26,4 Mpa untuk segmen 0,60 m m3 -
c. Beton precast f'c 26,4 Mpa untuk segmen 0,60 m diangkut 100 m m3 -
d. Beton precast f'c 26,4 Mpa untuk segmen 0,60 m diangkut 200 m m3 -
9 1 m3 timbunan pasir sebagai bahan pengisi m3 -
10 Timbunan 1m3 Sirtu padat m3 -
11 Lantai Kerja Beton f'c 7,4 Mpa m3 12.34
12 Bongkraan Beton m3 -
13 Bekisting balok beton biasa dgn kayu papan (TP) (dipakai 4 x) m2 -

Disetujui Diperiksa Oleh, Dibuat Oleh,


Direksi Pekerjaan Konsultan Kontraktor
PT. WAHANA KRIDA KONSULINDO PT. SAC NUSANTARA
Pudak Juni Laksana S.T., M.Eng. Aristoteles W. Adhidarma, S.T. Rochmad Khodarisman, S.T.
NIP : 19820624 201012 1 002 Team Leader SM
REHABILITASI JARINGAN IRIGASI D.I PROGO MANGGIS Kontrak Nomor : 10/PKK/PJPA.SO/2017
SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC NUSANTARA
Kegiatan Irigasi dan Rawa II TA.2017-2019 Konsultan : PT. WAHANA KRIDA KONSOLINDO

Sketch / Gambar
Jenis Pekerjaan : Pekerjaan Beton Status Hitungan : TERMYN-02
Lokasi : Saluran Induk Progo ( Hm.16+43 s.d. Hm.16+63 ) No. Lembar Halaman : 1 dari 3
Item Kegiatan :

Section Type Sketch / Gambar

Disetujui : Dicheck oleh : Disiapkan oleh :


Pengawas Lapangan

Surono Mardono Yohan Novara Sigit Andi Raharjo, S.T. Istianah, S.T.
Pengawas Lap-1 Pengawas Lap-2 Pengawas Lap-3 Konsultan Kontraktor
Quantity Surveyor
1.00
REHABILITASI JARINGAN IRIGASI D.I PROGO MANGGIS Kontrak Nomor : 10/PKK/PJPA.SO/2017

SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC NUSANTARA

Kegiatan Irigasi dan Rawa II TA.2017-2019 Konsultan : PT. WAHANA KRIDA KONSOLINDO

DENAH PEKERJAAN SALURAN SEKUNDER SUMBEREJO


Lokasi : SALURAN SEKUNDER SUMBEREJO ( Hm.00+00 s.d. Hm.03+75 ) Status Hitungan : TERMYN - 07

Jenis Pekerjaan : PEKERJAAN BETON Acuan Gambar Rencana :

Panjang Balok Memanajang Balok Melintang Panjang Lining Precast Terpasang


No. Balok Atas Balok Bawah No. Balok Dinding Dinding No. Segmen Per Segmen
Lantai Keterangan Keterangan
Frame Kanan Kiri Kanan Kiri Melintang Kanan Kiri Segmen Kanan Lantai Kiri Pas. Kanan Pas. Lantai Pas. Kiri
(m) (m) (m) (m) (bh) (bh) (bh) (m) (m) (m) (bh) (bh) (bh)

1 27.10 27.10 27.10 27.10 1 1.00 1.00 1.00 1 6.40 6.40 6.40
2 1.00 1.00 1.00 2 6.40 6.40 6.40
3 1.00 1.00 1.00 3 6.40 6.40 6.40
4 1.00 1.00 1.00 4 6.40 6.40 6.40
2 27.10 27.10 27.10 27.10 5 2.00 2.00 2.00 (Double Balok) 5 6.40 6.40 6.40
6 1.00 1.00 1.00 6 6.40 6.40 6.40
7 1.00 1.00 1.00 7 6.40 6.40 6.40
8 1.00 1.00 1.00 8 6.40 6.40 6.40
3 27.10 27.10 27.10 27.10 9 2.00 2.00 2.00 (Double Balok) 9 6.40 6.40 6.40
10 1.00 1.00 1.00 10 6.40 6.40 6.40
11 1.00 1.00 1.00 11 6.40 6.40 6.40
12 1.00 1.00 1.00 12 6.40 6.40 6.40
4 27.10 27.10 27.10 27.10 13 2.00 2.00 2.00 (Double Balok) 13 6.40 6.40 6.40
14 1.00 1.00 1.00 14 6.40 6.40 6.40
15 1.00 1.00 1.00 15 6.40 6.40 6.40
16 1.00 1.00 1.00 16 6.40 6.40 6.40
5 27.10 27.10 27.10 27.10 17 2.00 2.00 2.00 (Double Balok) 17 6.40 6.40 6.40
18 1.00 1.00 1.00 18 6.40 6.40 6.40
19 1.00 1.00 1.00 19 6.40 6.40 6.40
20 1.00 1.00 1.00 20 6.40 6.40 6.40
6 27.10 27.10 27.10 27.10 21 2.00 2.00 2.00 (Double Balok) 21 6.40 6.40 6.40
22 1.00 1.00 1.00 22 6.40 6.40 6.40
23 1.00 1.00 1.00 23 6.40 6.40 6.40
24 1.00 1.00 1.00 24 6.40 6.40 6.40
7 12.40 12.40 12.40 12.40 25 2.00 2.00 2.00 (Double Balok) 25 6.40 6.40 6.40
26 1.00 1.00 1.00 26 5.10 5.10 5.10
1.00 1.00 1.00

TOTAL 175.00 175.00 175.00 175.00 TOTAL 33.00 33.00 33.00 6 (Double Balok) TOTAL 165.10 165.10 165.10 - - -

Disetujui : Dicheck oleh : Disiapkan oleh :

Yohan Novara Mardono Sigit Andi Raharjo, S.T. Istianah, S.T.


Pengawas Lap-1 Pengawas Lap-2 Konsultan Supervisi Kontraktor
Quantity Surveyor
REHABILITASI JARINGAN IRIGASI DI PROGOMANGGIS Kontrak Nomor : 10/PKK/PJPA.SO/2017
SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC NUSANTATARA
Kegiatan Irigasi dan Rawa II TA.2015-2018 Konsultan : PT. WAHANA KRIDA KONSULINDO

REKAPAN PEKERJAAN TANAH


Nama Bangunan : Pekerjaan Beton Status Hitungan : MC - 100
Lokasi : Saluran Drainase Induk Progomanggis (Hm.142+11) No. Lembar Halaman : 1 dari 1
Item Kegiatan : Rekapan Pekerjaan Tanah

REKAPAN PEKRJAAN TANAH

NO URAIAN PEKERJAAN SAT JUMLAH KETERANGAN

1 - Galian tanah biasa dengan alat berat (mekanis)


- Saluran M3 612.18
- Pasangan M3 -
612.18 M3

2 - Galian tanah biasa diangkut sejauh 10 m


- Saluran M3 -
- Pasangan M3 -
- M3

3 - Timbunan tanah atau Urugan tanah kembali manual


- Saluran M3 326.17
- Pasangan M3 -
326.17 M3

4 - Pemadatan tanah menggunakan stemper


- Saluran M3 326.17
- Pasangan M3 -
326.17 M3

Disetujui : Dicheck oleh : Disiapkan oleh :


Pengawas Lapangan

Mardono Yohan Novara Petrus Widyatama, S.T. Istianah, S.T.


Pengawas Lap-1 Pengawas Lap-2 Konsultan Kontraktor
Quantity Surveyor
REHABILITASI JARINGAN IRIGASI DI.PROGOMANGGIS Kontrak Nomor : 10/PKK/PJPA.S0/2017
SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC. NUSANTARA
Kegiatan Irigasi dan Rawa II TA.2017-2019 Konsultan Supervisi : PT. WAHANA KRIDA KONSULINDO

HITUNGAN VOLUME GALIAN, TIMBUNAN, dan PEMADATAN


Lokasi : Saluran Drainase Induk Progomanggis (Hm.142+11) Status Hitungan : MC - 100
No. Propil. : STA 0+00 s.d. STA 2+3.95
Item Kegiatan : Galian - Timbunan - Pemadatan

Jarak L Komulatif Area Galian (m3) Timbunan (m3) Pemadatan(m3)


No. No Patok KETERANGAN
(m) (m) Galian (m2) Timbunan(m2) Pemadatan(m2) Each Unit Each Unit Each Unit

1 STA 0+00 0.00 2.25 0.90 0.90


25.00 55.25 22.38 22.38
2 STA 0+25 25.00 2.17 0.89 0.89
25.00 57.38 24.75 24.75
3 STA 0+50 50.00 2.42 1.09 1.09
25.00 64.00 29.63 29.63
4 STA 0+75 75.00 2.70 1.28 1.28
25.00 74.88 38.75 38.75
5 STA 1+00 100.00 3.29 1.82 1.82
25.00 78.75 42.88 42.88
6 STA 1+25 125.00 3.01 1.61 1.61
25.00 78.00 42.25 42.25
7 STA 1+50 150.00 3.23 1.77 1.77
28.50 101.46 60.14 60.14
8 STA 1+78.5 178.50 3.89 2.45 2.45
16.00 63.68 40.56 40.56
9 STA 1+94.5 194.50 4.07 2.62 2.62
9.45 38.79 24.85 24.85
10 STA 2+3.95 203.95 4.14 2.64 2.64

A Galian tanah biasa diangkut sejauh 10 m


- = - m3
- = - m3
TOTAL = - m3

203.95 612.18 326.17 326.17

A Galian tanah biasa dengan alat berat (mekanis) = 612.18 m3


B Galian tanah biasa diangkut sejauh 10 m = - m3
Total Galian = 612.18 m3

C Timbunan tanah atau Urugan tanah kembali manual = 326.17 m3


D Pemadatan tanah menggunakan stemper = 326.17 m3

Disetujui : Dicheck oleh : Disiapkan oleh :


Pengawas Lapangan

Mardono Yohan Novara Petrus Widyatama, S.T. Istianah, S.T.


Pengawas Lap-1 Pengawas Lap-2 Konsultan Supervisi Kontraktor
Quantity Surveyor
REHABILITASI JARINGAN IRIGASI D.I PROGO MANGGIS Kontrak Nomor : 10/PKK/PJPA.SO/2017

SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC NUSANTARA

Kegiatan Irigasi dan Rawa II TA.2017-2019 Konsultan : PT. WAHANA KRIDA KONSOLINDO

HITUNGAN VOLUME GALIAN, TIMBUNAN DAN PEMADATAN Chart Title

Lokasi : SALURAN DRAINASE Status Hitungan : MC-100


No. Propil. : STA. 0+00 Acuan Gambar Rencana : `
Item Kegiatan : Galian - Timbunan - Pemadatan No. Lembar Halaman : 1 of 56

CALCULATION

Galian Timbunan - Pemadatan OGL


Coordinate X Y Coordinate X Y Coordinate
Point XxB YxA Point XxB YxA Point
x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y
0 0
0
1 4.103 377.168 (1.070) (0.017) (403.570) (0.070) 1 4.130 377.060 (2.110) - (795.597) - 1 2.173 377.374
2 5.173 377.185 (2.097) 0.170 (790.957) 0.879 2 6.240 377.060 (2.110) (0.100) (795.597) (0.624) 2 3.623 377.160
3 6.200 376.998 (0.750) 1.295 (282.749) 8.029 3 6.240 377.160 (0.225) (0.100) (84.861) (0.624) 3 5.173 377.185
4 5.923 375.890 1.777 1.108 667.957 6.563 4 6.465 377.160 (0.483) 0.258 (182.168) 1.668 4 6.723 376.902
5 4.423 375.890 1.820 (1.278) 684.120 (5.653) 5 6.723 376.902 0.265 0.162 99.879 1.089 5 6.873 376.902
6 4.103 377.168 0.320 (1.278) 120.694 (5.244) 6 6.200 376.998 0.800 1.012 301.598 6.274 6 6.873 376.752
7 5.923 375.890 0.477 1.108 179.300 6.563 7 7.123 376.502
8 5.723 375.890 0.200 (1.150) 75.178 (6.581) 8 7.373 376.752
9 5.723 377.040 1.100 (1.150) 414.744 (6.581) 9 7.373 376.869
10 4.623 377.040 1.100 1.150 414.744 5.316 10 8.173 376.869
11 4.623 375.890 0.200 1.150 75.178 5.316
12 4.423 375.890 0.493 (1.170) 185.314 (5.175)
13 4.130 377.060 0.293 (1.170) 110.479 (4.832)

JUMLAH (4.505) 4.505 JUMLAH (1.809) 1.809


LUAS AREA GALIAN (M2) 2.25 LUAS AREA TIMBUNAN-PEMADATAN (M2) 0.90

SKETCH

STA.0+00

Sal. Drain
+ 377.04
+ 376.89

+ 376.09
+ 375.89

Cor Insitu
f 'c 14,5 Mpa

SKETCH

Chart Title
Galian Timbunan OGL

377

376

375

374
0 1 2 3 4 5 6 7 8 9 10 11 12 13
REHABILITASI JARINGAN IRIGASI D.I PROGO MANGGIS Kontrak Nomor : 10/PKK/PJPA.SO/2017

SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC NUSANTARA

Kegiatan Irigasi dan Rawa II TA.2017-2019 Konsultan : PT. WAHANA KRIDA KONSOLINDO

HITUNGAN VOLUME GALIAN, TIMBUNAN DAN PEMADATAN Chart Title


Lokasi : SALURAN DRAINASE Status Hitungan : MC-100
No. Propil. : STA. 0+25 Acuan Gambar Rencana : `
Item Kegiatan : Galian - Timbunan - Pemadatan No. Lembar Halaman : 2 of 56

CALCULATION

Galian Timbunan - Pemadatan OGL


Coordinate X Y Coordinate X Y Coordinate
Point XxB YxA Point XxB YxA Point
x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y
0 0
0 0 0
1 4.110 377.031 (1.063) 0.046 (400.784) 0.189 1 4.130 376.952 (2.111) - (795.746) - 1 2.173 377.107
2 5.173 376.985 (2.101) 0.100 (792.045) 0.517 2 6.241 376.952 (2.111) (0.100) (795.746) (0.624) 2 3.623 377.052
3 6.211 376.931 (0.750) 1.205 (282.698) 7.484 3 6.241 377.052 (0.335) (0.100) (126.312) (0.624) 3 5.173 376.985
4 5.923 375.780 1.788 1.151 671.895 6.817 4 6.576 377.052 (0.482) 0.147 (181.739) 0.967 4 6.723 376.905
5 4.423 375.780 1.813 (1.251) 681.289 (5.533) 5 6.723 376.905 0.365 0.121 137.570 0.813 5 6.873 376.905
6 4.110 377.031 0.313 (1.251) 118.011 (5.142) 6 6.211 376.931 0.800 1.125 301.545 6.987 6 6.873 376.755
7 5.923 375.780 0.488 1.151 183.381 6.817 7 7.123 376.505
8 5.723 375.780 0.200 (1.150) 75.156 (6.581) 8 7.373 376.755
9 5.723 376.930 1.100 (1.150) 414.623 (6.581) 9 7.373 376.905
10 4.623 376.930 1.100 1.150 414.623 5.316 10 8.173 376.941
11 4.623 375.780 0.200 1.150 75.156 5.316
12 4.423 375.780 0.493 (1.172) 185.260 (5.184)
13 4.130 376.952 0.293 (1.172) 110.447 (4.840)

JUMLAH (4.333) 4.333 JUMLAH (1.783) 1.783


LUAS AREA GALIAN (M2) 2.17 LUAS AREA TIMBUNAN-PEMADATAN (M2) 0.89

SKETCH

STA.0+25

Sal. Drain

+ 376.81
+ 376.66

+ 375.86
+ 375.66

Cor Insitu
f 'c 14,5 Mpa

SKETCH

Chart Title
Galian Timbunan OGL

377

376

375

374
0 1 2 3 4 5 6 7 8 9 10 11 12

Lokasi : SALURAN DRAINASE Status Hitungan : MC-100


REHABILITASI JARINGAN IRIGASI D.I PROGO MANGGIS Kontrak Nomor : 10/PKK/PJPA.SO/2017

SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC NUSANTARA

Kegiatan Irigasi dan Rawa II TA.2017-2019 Konsultan : PT. WAHANA KRIDA KONSOLINDO

HITUNGAN VOLUME GALIAN, TIMBUNAN DAN PEMADATAN Chart Title


No. Propil. : STA. 0+50 Acuan Gambar Rencana : `
Item Kegiatan : Galian - Timbunan - Pemadatan No. Lembar Halaman : 3 of 56

CALCULATION

Galian Timbunan - Pemadatan OGL


Coordinate X Y Coordinate X Y Coordinate
Point XxB YxA Point XxB YxA Point
x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y
0 0
0 0 0
1 4.084 377.018 (1.089) 0.032 (410.573) 0.131 1 4.105 376.931 (2.136) - (805.125) - 1 2.173 377.072
2 5.173 376.986 (2.157) 0.087 (813.159) 0.450 2 6.241 376.931 (1.818) 1.271 (685.261) 7.932 2 3.623 377.031
3 6.241 376.931 (0.750) 1.326 (282.698) 8.276 3 5.923 375.660 0.518 1.271 194.592 7.528 3 5.173 376.986
4 5.923 375.660 1.818 1.271 682.950 7.528 4 5.723 375.660 0.200 (1.150) 75.132 (6.581) 4 6.723 376.906
5 4.423 375.660 1.839 (1.358) 690.839 (6.006) 5 5.723 376.810 1.100 (1.150) 414.491 (6.581) 5 6.873 376.906
6 4.084 377.018 0.339 (1.358) 127.809 (5.546) 6 4.623 376.810 1.100 1.150 414.491 5.316 6 6.873 376.756
7 4.623 375.660 0.200 1.150 75.132 5.316 7 7.123 376.506
8 4.423 375.660 0.518 (1.271) 194.592 (5.622) 8 7.373 376.756
9 4.105 376.931 0.318 (1.271) 119.864 (5.217) 9 7.373 376.906
10 8.173 376.960

1 6.266 377.031 (0.332) - (125.174) -


2 6.598 377.031 (0.457) 0.125 (172.303) 0.825
3 6.723 376.906 0.332 0.101 125.133 0.679
4 6.266 376.930 0.457 (0.125) 172.257 (0.783)
5 6.266 377.031 - (0.101) - (0.633)

JUMLAH (4.832) 4.832 JUMLAH (2.179) 2.179


LUAS AREA GALIAN (M2) 2.42 LUAS AREA TIMBUNAN-PEMADATAN (M2) 1.09
SKETCH

STA.0+50

Sal. Drain

+ 376.93
+ 376.78

+ 375.98
+ 375.78

Cor Insitu
f 'c 14,5 Mpa

SKETCH

Chart Title
Galian Timbunan OGL

378

377

376

375
0 1 2 3 4 5 6 7 8 9 10 11 12

Lokasi : SALURAN DRAINASE Status Hitungan : MC-100


No. Propil. : STA. 0+75 Acuan Gambar Rencana : `
Item Kegiatan : Galian - Timbunan - Pemadatan No. Lembar Halaman : 4 of 56
REHABILITASI JARINGAN IRIGASI D.I PROGO MANGGIS Kontrak Nomor : 10/PKK/PJPA.SO/2017

SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC NUSANTARA

Kegiatan Irigasi dan Rawa II TA.2017-2019 Konsultan : PT. WAHANA KRIDA KONSOLINDO

HITUNGAN VOLUME GALIAN, TIMBUNAN DAN PEMADATAN Chart Title

CALCULATION

Galian Timbunan - Pemadatan OGL


Coordinate X Y Coordinate X Y Coordinate
Point XxB YxA Point XxB YxA Point
x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y
0 0
0 0
1 4.066 376.978 (1.107) (0.021) (417.315) (0.085) 1 4.079 376.927 (2.188) - (824.716) - 1 2.173 376.851
2 5.173 376.999 (2.226) (0.049) (839.200) (0.253) 2 6.267 376.927 (1.844) 1.377 (695.053) 8.630 2 3.623 376.970
3 6.292 377.027 (0.750) 1.449 (282.770) 9.117 3 5.923 375.550 0.544 1.377 204.299 8.156 3 5.173 376.999
4 5.923 375.550 1.869 1.477 701.903 8.748 4 5.723 375.550 0.200 (1.150) 75.110 (6.581) 4 6.723 377.038
5 4.423 375.550 1.857 (1.428) 697.396 (6.316) 5 5.723 376.700 1.100 (1.150) 414.370 (6.581) 5 6.873 377.038
6 4.066 376.978 0.357 (1.428) 134.581 (5.806) 6 4.623 376.700 1.100 1.150 414.370 5.316 6 6.873 376.888
7 4.623 375.550 0.200 1.150 75.110 5.316 7 7.123 376.638
8 4.423 375.550 0.544 (1.377) 204.299 (6.090) 8 7.373 376.888
9 4.079 376.927 0.344 (1.377) 129.663 (5.617) 9 7.373 377.038
10 8.173 377.070

-0.010 0.010
JUMLAH (5.404) 5.404 JUMLAH (2.558) 2.558
LUAS AREA GALIAN (M2) 2.70 LUAS AREA TIMBUNAN-PEMADATAN (M2) 1.28

SKETCH

STA.0+75

Sal. Drain

+ 376.70
+ 376.55

+ 375.75
+ 375.55

Cor Insitu
f 'c 14,5 Mpa

SKETCH

Chart Title
Galian Timbunan OGL

377

376

375

374
0 1 2 3 4 5 6 7 8 9 10 11 12

Lokasi : SALURAN DRAINASE Status Hitungan : MC-100


No. Propil. : STA. 1+00 Acuan Gambar Rencana : `
Item Kegiatan : Galian - Timbunan - Pemadatan No. Lembar Halaman : 5 of 56
REHABILITASI JARINGAN IRIGASI D.I PROGO MANGGIS Kontrak Nomor : 10/PKK/PJPA.SO/2017

SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC NUSANTARA

Kegiatan Irigasi dan Rawa II TA.2017-2019 Konsultan : PT. WAHANA KRIDA KONSOLINDO

HITUNGAN VOLUME GALIAN, TIMBUNAN DAN PEMADATAN Chart Title

CALCULATION

Galian Timbunan - Pemadatan OGL


Coordinate X Y Coordinate X Y Coordinate
Point XxB YxA Point XxB YxA Point
x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y
0 0
0 0 0
1 4.000 377.121 (1.173) (0.017) (442.363) (0.068) 1 4.018 377.051 (2.310) - (870.988) - 1 2.173 377.116
2 5.173 377.138 (2.353) (0.030) (887.406) (0.155) 2 6.328 377.051 (1.905) 1.621 (718.282) 10.258 2 3.623 377.116
3 6.353 377.151 (0.750) 1.708 (282.863) 10.851 3 5.923 375.430 0.605 1.621 227.135 9.601 3 5.173 377.138
4 5.923 375.430 1.930 1.721 724.580 10.193 4 5.723 375.430 0.200 (1.150) 75.086 (6.581) 4 6.723 377.155
5 4.423 375.430 1.923 (1.691) 721.952 (7.479) 5 5.723 376.580 1.100 (1.150) 414.238 (6.581) 5 6.873 377.155
6 4.000 377.121 0.423 (1.691) 159.522 (6.764) 6 4.623 376.580 1.100 1.150 414.238 5.316 6 6.873 377.005
7 4.623 375.430 0.200 1.150 75.086 5.316 7 7.123 376.755
8 4.423 375.430 0.605 (1.621) 227.135 (7.170) 8 7.373 377.005
9 4.018 377.051 0.405 (1.621) 152.706 (6.513) 9 7.373 377.155
10 8.173 377.173

JUMLAH (6.578) 6.578 JUMLAH (3.646) 3.646


LUAS AREA GALIAN (M2) 3.29 LUAS AREA TIMBUNAN-PEMADATAN (M2) 1.82

SKETCH

STA.1+00

Sal. Drain

+ 376.58
+ 376.43

+ 375.63
+ 375.43

Cor Insitu
f 'c 14,5 Mpa

SKETCH

Chart Title
Galian Timbunan OGL

378

377

376

375
0 1 2 3 4 5 6 7 8 9 10 11 12 13

Lokasi : SALURAN DRAINASE Status Hitungan : MC-100


No. Propil. : STA. 1+25 Acuan Gambar Rencana : `
REHABILITASI JARINGAN IRIGASI D.I PROGO MANGGIS Kontrak Nomor : 10/PKK/PJPA.SO/2017

SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC NUSANTARA

Kegiatan Irigasi dan Rawa II TA.2017-2019 Konsultan : PT. WAHANA KRIDA KONSOLINDO

HITUNGAN VOLUME GALIAN, TIMBUNAN DAN PEMADATAN Chart Title


Item Kegiatan : Galian - Timbunan - Pemadatan No. Lembar Halaman : 6 of 56

CALCULATION

Galian Timbunan - Pemadatan OGL


Coordinate X Y Coordinate X Y Coordinate
Point XxB YxA Point XxB YxA Point
x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y
0 0
0 0 0
1 4.041 376.846 (1.132) (0.066) (426.590) (0.267) 1 4.041 376.846 (2.264) - (853.179) - 1 2.173 376.821
2 5.173 376.912 (2.291) (0.110) (863.505) (0.569) 2 6.305 376.846 (1.882) 1.526 (709.224) 9.621 2 3.623 376.822
3 6.332 376.956 (0.750) 1.592 (282.717) 10.081 3 5.923 375.320 0.582 1.526 218.436 9.038 3 5.173 376.912
4 5.923 375.320 1.909 1.636 716.486 9.690 4 5.723 375.320 0.200 (1.150) 75.064 (6.581) 4 6.723 376.971
5 4.423 375.320 1.882 (1.526) 706.352 (6.749) 5 5.723 376.470 1.100 (1.150) 414.117 (6.581) 5 6.873 376.971
6 4.041 376.846 0.382 (1.526) 143.955 (6.167) 6 4.623 376.470 1.100 1.150 414.117 5.316 6 6.873 376.821
7 4.623 375.320 0.200 1.150 75.064 5.316 7 7.123 376.571
8 4.423 375.320 0.582 (1.526) 218.436 (6.749) 8 7.373 376.821
9 4.041 376.846 0.382 (1.526) 143.955 (6.167) 9 7.373 376.971
10 8.173 377.053

JUMLAH (6.019) 6.019 JUMLAH (3.214) 3.214


LUAS AREA GALIAN (M2) 3.01 LUAS AREA TIMBUNAN-PEMADATAN (M2) 1.61

SKETCH

STA.1+25

Sal. Drain

+ 376.35
+ 376.20

+ 375.40
+ 375.20

Cor Insitu
f 'c 14,5 Mpa

SKETCH

Chart Title
Galian Timbunan OGL

377

376

375

374
0 1 2 3 4 5 6 7 8 9 10 11 12 13

Lokasi : SALURAN DRAINASE Status Hitungan : MC-100


No. Propil. : STA. 1+50 Acuan Gambar Rencana : `
REHABILITASI JARINGAN IRIGASI D.I PROGO MANGGIS Kontrak Nomor : 10/PKK/PJPA.SO/2017

SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC NUSANTARA

Kegiatan Irigasi dan Rawa II TA.2017-2019 Konsultan : PT. WAHANA KRIDA KONSOLINDO

HITUNGAN VOLUME GALIAN, TIMBUNAN DAN PEMADATAN Chart Title


Item Kegiatan : Galian - Timbunan - Pemadatan No. Lembar Halaman : 7 of 56
CALCULATION

Galian Timbunan - Pemadatan OGL


Coordinate X Y Coordinate X Y Coordinate
Point XxB YxA Point XxB YxA Point
x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y
0 0
0
1 6.335 376.848 0.412 1.648 155.261 10.440 1 6.322 376.798 0.399 1.598 150.342 10.103 1 2.173 376.937
2 5.923 375.200 1.912 1.648 717.382 9.761 2 5.923 375.200 0.599 1.598 224.745 9.465 2 3.623 376.899
3 4.423 375.200 1.925 (1.698) 722.260 (7.510) 3 5.723 375.200 0.200 (1.150) 75.040 (6.581) 3 5.173 376.894
4 3.998 376.898 (0.750) (1.694) (282.674) (6.773) 4 5.723 376.350 1.100 (1.150) 413.985 (6.581) 4 6.723 376.833
5 5.173 376.894 (2.337) 0.050 (880.801) 0.259 5 4.623 376.350 1.100 1.150 413.985 5.316 5 6.873 376.833
6 6.335 376.848 (1.162) 0.046 (437.897) 0.291 6 4.623 375.200 0.200 1.150 75.040 5.316 6 6.873 376.683
7 4.423 375.200 0.600 (1.598) 225.120 (7.068) 7 7.123 376.433
8 4.023 376.798 (1.899) (1.598) (715.539) (6.429) 8 7.373 376.683
9 6.322 376.798 (2.299) - (866.259) - 9 7.373 376.833
10 8.173 376.873

JUMLAH (6.468) 6.468 JUMLAH (3.541) 3.541


LUAS AREA GALIAN (M2) 3.23 LUAS AREA TIMBUNAN-PEMADATAN (M2) 1.77

SKETCH

STA.1+50

Sal. Drain

+ 376.47
+ 376.32

+ 375.52
+ 375.32

Cor Insitu
f 'c 14,5 Mpa

SKETCH

Chart Title
Galian Timbunan OGL

378

377

376

375
0 1 2 3 4 5 6 7 8 9 10 11 12

Lokasi : SALURAN DRAINASE Status Hitungan : MC-100


No. Propil. : STA. 1+78.5 Acuan Gambar Rencana : `
REHABILITASI JARINGAN IRIGASI D.I PROGO MANGGIS Kontrak Nomor : 10/PKK/PJPA.SO/2017

SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC NUSANTARA

Kegiatan Irigasi dan Rawa II TA.2017-2019 Konsultan : PT. WAHANA KRIDA KONSOLINDO

HITUNGAN VOLUME GALIAN, TIMBUNAN DAN PEMADATAN Chart Title


Item Kegiatan : Galian - Timbunan - Pemadatan No. Lembar Halaman : 8 of 56

CALCULATION

Galian Timbunan - Pemadatan OGL


Coordinate X Y Coordinate X Y Coordinate
Point XxB YxA Point XxB YxA Point
x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y
0 0
0
1 4.956 377.002 0.483 1.932 182.092 9.575 1 4.944 376.953 0.471 1.883 177.545 9.310 1 0.673 377.559
2 4.473 375.070 1.983 1.932 743.764 8.642 2 4.473 375.070 0.671 1.883 251.672 8.423 2 2.173 377.559
3 2.973 375.070 1.996 (1.983) 748.640 (5.895) 3 4.273 375.070 0.200 (1.150) 75.014 (4.914) 3 2.173 377.059
4 2.477 377.053 (0.650) (1.960) (245.084) (4.855) 4 4.273 376.220 1.100 (1.150) 413.842 (4.914) 4 3.623 377.030
5 3.623 377.030 (2.479) 0.051 (934.657) 0.185 5 3.173 376.220 1.100 1.150 413.842 3.649 5 5.173 376.997
6 4.956 377.002 (1.333) 0.028 (502.544) 0.139 6 3.173 375.070 0.200 1.150 75.014 3.649 6 6.723 376.980
7 2.973 375.070 0.671 (1.883) 251.672 (5.598) 7 8.173 376.952
8 2.502 376.953 (1.971) (1.883) (742.974) (4.711)
9 4.944 376.953 (2.442) - (920.519) -

JUMLAH (7.790) 7.790 JUMLAH (4.893) 4.893


LUAS AREA GALIAN (M2) 3.89 LUAS AREA TIMBUNAN-PEMADATAN (M2) 2.45

SKETCH

STA.1+78.5
TAMAN

+ 376.22
+ 376.06

+ 375.27
+ 375.07

Cor Insitu
f 'c 14,5 Mpa

SKETCH

Chart Title
Galian Timbunan OGL

378

377

376

375
0 1 2 3 4 5 6 7 8 9 10 11 12

Lokasi : SALURAN DRAINASE Status Hitungan : MC-100


No. Propil. : STA. 1+94.5 Acuan Gambar Rencana : `
REHABILITASI JARINGAN IRIGASI D.I PROGO MANGGIS Kontrak Nomor : 10/PKK/PJPA.SO/2017

SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC NUSANTARA

Kegiatan Irigasi dan Rawa II TA.2017-2019 Konsultan : PT. WAHANA KRIDA KONSOLINDO

HITUNGAN VOLUME GALIAN, TIMBUNAN DAN PEMADATAN Chart Title


Item Kegiatan : Galian - Timbunan - Pemadatan No. Lembar Halaman : 9 of 56

CALCULATION

Galian Timbunan - Pemadatan OGL


Coordinate X Y Coordinate X Y Coordinate
Point XxB YxA Point XxB YxA Point
x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y
0 0
0 0 0
1 4.973 377.001 0.500 2.001 188.501 9.951 1 4.961 376.953 0.488 1.953 183.953 9.689 1 0.673 377.559
2 4.473 375.000 2.000 2.001 750.000 8.950 2 4.473 375.000 0.688 1.953 258.000 8.736 2 2.173 377.559
3 2.973 375.000 2.013 (2.053) 754.875 (6.104) 3 4.273 375.000 0.200 (1.150) 75.000 (4.914) 3 2.173 377.059
4 2.460 377.053 (0.650) (2.030) (245.084) (4.994) 4 4.273 376.150 1.100 (1.150) 413.765 (4.914) 4 3.623 377.030
5 3.623 377.030 (2.513) 0.052 (947.476) 0.188 5 3.173 376.150 1.100 1.150 413.765 3.649 5 5.173 376.997
6 4.973 377.001 (1.350) 0.029 (508.951) 0.144 6 3.173 375.000 0.200 1.150 75.000 3.649 6 6.723 376.980
7 2.973 375.000 0.688 (1.953) 258.000 (5.806) 7 8.173 376.952
8 2.485 376.953 (1.988) (1.953) (749.383) (4.853)
9 4.961 376.953 (2.476) - (933.336) -

JUMLAH (8.137) 8.137 JUMLAH (5.235) 5.235


LUAS AREA GALIAN (M2) 4.07 LUAS AREA TIMBUNAN-PEMADATAN (M2) 2.62

SKETCH

STA.1+94.5

+ 377.15
+ 376.00

+ 375.20
+ 375.00

Cor Insitu
f 'c 14,5 Mpa

SKETCH

Chart Title
Galian Timbunan OGL

377

376

375

374
0 1 2 3 4 5 6 7 8 9 10 11 12 13

Lokasi : SALURAN DRAINASE Status Hitungan : MC-100


No. Propil. : STA. 02+2.4 Acuan Gambar Rencana : `
REHABILITASI JARINGAN IRIGASI D.I PROGO MANGGIS Kontrak Nomor : 10/PKK/PJPA.SO/2017

SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC NUSANTARA

Kegiatan Irigasi dan Rawa II TA.2017-2019 Konsultan : PT. WAHANA KRIDA KONSOLINDO

HITUNGAN VOLUME GALIAN, TIMBUNAN DAN PEMADATAN Chart Title


Item Kegiatan : Galian - Timbunan - Pemadatan No. Lembar Halaman : 10 of 56

CALCULATION

Galian Timbunan - Pemadatan OGL


Coordinate X Y Coordinate X Y Coordinate
Point XxB YxA Point XxB YxA Point
x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y
0 0
0 0 0
1 4.987 377.016 0.514 2.056 193.786 10.253 1 4.963 376.920 0.490 1.960 184.691 9.727 1 0.673 377.522
2 4.473 374.960 2.014 2.056 755.169 9.196 2 4.473 374.960 0.690 1.960 258.722 8.767 2 2.173 377.522
3 2.973 374.960 2.015 (2.060) 755.544 (6.124) 3 4.273 374.960 0.200 (1.150) 74.992 (4.914) 3 2.173 377.022
4 2.458 377.020 (0.650) (2.052) (245.063) (5.044) 4 4.273 376.110 1.100 (1.150) 413.721 (4.914) 4 3.623 377.012
5 3.623 377.012 (2.529) 0.004 (953.463) 0.014 5 3.173 376.110 1.100 1.150 413.721 3.649 5 5.173 377.017
6 4.987 377.016 (1.364) (0.004) (514.250) (0.020) 6 3.173 374.960 0.200 1.150 74.992 3.649 6 6.723 377.032
7 2.973 374.960 0.690 (1.960) 258.722 (5.827) 7 8.173 377.047
8 2.483 376.920 (1.990) (1.960) (750.071) (4.867)
9 4.963 376.920 (2.480) - (934.762) -

JUMLAH (8.276) 8.276 JUMLAH (5.271) 5.271


LUAS AREA GALIAN (M2) 4.14 LUAS AREA TIMBUNAN-PEMADATAN (M2) 2.64

SKETCH

STA.02+2.4
TAMAN

+ 376.11
+ 375.96

+ 375.16
+ 374.96

Cor Insitu
f 'c 14,5 Mpa

SKETCH

Chart Title
Galian Timbunan OGL

378

377

376

375

374
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Lokasi : SALURAN DRAINASE Status Hitungan : MC-100


No. Propil. : Acuan Gambar Rencana : `
Item Kegiatan : Galian - Timbunan - Pemadatan No. Lembar Halaman : 11 of 56
REHABILITASI JARINGAN IRIGASI D.I PROGO MANGGIS Kontrak Nomor : 10/PKK/PJPA.SO/2017

SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC NUSANTARA

Kegiatan Irigasi dan Rawa II TA.2017-2019 Konsultan : PT. WAHANA KRIDA KONSOLINDO

HITUNGAN VOLUME GALIAN, TIMBUNAN DAN PEMADATAN Chart Title

CALCULATION

Galian Timbunan - Pemadatan OGL


Coordinate X Y Coordinate X Y Coordinate
Point XxB YxA Point XxB YxA Point
x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y
0 0
0 0 0

JUMLAH - - JUMLAH - -
LUAS AREA GALIAN (M2) - LUAS AREA TIMBUNAN-PEMADATAN (M2) -

SKETCH

SKETCH

Chart Title
Galian Timbunan OGL

396

395

394

393

392

391
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Lokasi : SALURAN DRAINASE Status Hitungan : MC-100


No. Propil. : P.Mg.10 Acuan Gambar Rencana : `
Item Kegiatan : Galian - Timbunan - Pemadatan No. Lembar Halaman : 12 of 56
REHABILITASI JARINGAN IRIGASI D.I PROGO MANGGIS Kontrak Nomor : 10/PKK/PJPA.SO/2017

SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC NUSANTARA

Kegiatan Irigasi dan Rawa II TA.2017-2019 Konsultan : PT. WAHANA KRIDA KONSOLINDO

HITUNGAN VOLUME GALIAN, TIMBUNAN DAN PEMADATAN Chart Title

CALCULATION

Galian Timbunan - Pemadatan OGL


Coordinate X Y Coordinate X Y Coordinate
Point XxB YxA Point XxB YxA Point
x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y
0 0
0 0 0
0
0
0
0
0
0

JUMLAH - - JUMLAH - -
LUAS AREA GALIAN (M2) - LUAS AREA TIMBUNAN-PEMADATAN (M2) -

SKETCH

SKETCH

Chart Title
Galian Timbunan OGL

397

396

395

394

393

392

391
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Lokasi : SALURAN DRAINASE Status Hitungan : MC-100


No. Propil. : P.Mg.11 Acuan Gambar Rencana : `
Item Kegiatan : Galian - Timbunan - Pemadatan No. Lembar Halaman : 13 of 56
REHABILITASI JARINGAN IRIGASI D.I PROGO MANGGIS Kontrak Nomor : 10/PKK/PJPA.SO/2017

SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC NUSANTARA

Kegiatan Irigasi dan Rawa II TA.2017-2019 Konsultan : PT. WAHANA KRIDA KONSOLINDO

HITUNGAN VOLUME GALIAN, TIMBUNAN DAN PEMADATAN Chart Title

CALCULATION

Galian Timbunan - Pemadatan OGL


Coordinate X Y Coordinate X Y Coordinate
Point XxB YxA Point XxB YxA Point
x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y
0 0
0 0 0

JUMLAH - - JUMLAH - -
LUAS AREA GALIAN (M2) - LUAS AREA TIMBUNAN-PEMADATAN (M2) -

SKETCH

SKETCH

Chart Title
Galian Timbunan OGL

397

396

395

394

393

392

391
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

Lokasi : SALURAN DRAINASE Status Hitungan : MC-100


No. Propil. : P.Mg.12 Acuan Gambar Rencana : `
Item Kegiatan : Galian - Timbunan - Pemadatan No. Lembar Halaman : 14 of 56
REHABILITASI JARINGAN IRIGASI D.I PROGO MANGGIS Kontrak Nomor : 10/PKK/PJPA.SO/2017

SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC NUSANTARA

Kegiatan Irigasi dan Rawa II TA.2017-2019 Konsultan : PT. WAHANA KRIDA KONSOLINDO

HITUNGAN VOLUME GALIAN, TIMBUNAN DAN PEMADATAN Chart Title

CALCULATION

Galian Timbunan - Pemadatan OGL


Coordinate X Y Coordinate X Y Coordinate
Point XxB YxA Point XxB YxA Point
x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y
0 0
0 0 0
1 21.763 394.843 0.211 0.843 83.312 18.346 1 24.107 395.000 1.108 0.123 437.660 2.965 1 4.212 393.136
2 21.552 394.000 1.411 0.843 555.934 18.168 2 22.999 394.877 2.344 0.157 925.592 3.611 2 6.625 393.277
3 20.352 394.000 1.416 (0.862) 557.904 (17.543) 3 21.763 394.843 1.447 0.877 571.338 19.086 3 6.781 394.314
4 20.136 394.862 (0.713) (0.824) (281.537) (16.592) 4 21.552 394.000 0.211 (0.157) 83.134 (3.384) 4 7.081 394.314
5 21.065 394.824 (1.627) 0.019 (642.379) 0.400 5 21.552 395.000 (2.555) (1.000) (1,009.225) (21.552) 5 7.959 394.325
6 21.763 394.843 (0.698) (0.019) (275.600) (0.413) 6 24.107 395.000 (2.555) - (1,009.225) - 6 11.149 394.325
7 11.462 394.378
8 11.612 394.727
1 10.850 394.325 - 0.015 - 0.163 1 20.352 394.000 0.216 (0.862) 85.104 (17.543) 9 11.912 394.727
2 10.850 394.310 2.700 0.015 1,064.637 0.163 2 20.136 394.862 0.556 (0.876) 219.543 (17.639) 10 11.912 393.569
3 8.150 394.310 2.700 (0.015) 1,064.637 (0.122) 3 19.796 394.876 1.466 0.011 578.888 0.218 11 12.279 393.201
4 8.150 394.325 (2.700) (0.015) (1,064.678) (0.122) 4 18.670 394.851 1.821 0.131 719.024 2.446 12 13.143 392.790
5 10.850 394.325 (2.700) - (1,064.678) - 5 17.975 394.745 1.318 0.418 520.274 7.514 13 14.604 392.763
6 17.352 394.433 0.056 (0.255) 22.088 (4.425) 14 15.926 392.817
7 17.919 395.000 (3.000) (0.567) (1,185.000) (10.160) 15 16.751 393.268
8 20.352 395.000 (2.433) 1.000 (961.035) 20.352 16 17.052 393.569
9 20.352 394.000 - 1.000 - 20.352 17 17.052 394.433
18 17.352 394.433
19 17.975 394.745
20 18.670 394.851
21 19.796 394.876
22 21.065 394.824
23 22.999 394.877
24 24.107 395.000

JUMLAH (2.447) 2.447 JUMLAH (1.840) 1.840


LUAS AREA GALIAN (M2) 1.22 LUAS AREA TIMBUNAN-PEMADATAN (M2) 0.92

SKETCH

P.Mg.12 ( Hm.06+16)

+ 395.00 + 395.00
Beton Tanpa Tulangan
f' c = 14,5 Mpa
Pasir Batu
+ 39 4.51
+ 394.30
+ 394.00
+ 393 .71 Pas angan Batu
1 1 ( 1 Pc : 4 pp )
1 1

M A + 392.84

+ 392 .44

SKETCH

Chart Title
Galian Timbunan OGL

396

395

394

393

392

391
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

Lokasi : SALURAN DRAINASE Status Hitungan : MC-100


No. Propil. : P.Mg.13 Acuan Gambar Rencana : `
Item Kegiatan : Galian - Timbunan - Pemadatan No. Lembar Halaman : 15 of 56
REHABILITASI JARINGAN IRIGASI D.I PROGO MANGGIS Kontrak Nomor : 10/PKK/PJPA.SO/2017

SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC NUSANTARA

Kegiatan Irigasi dan Rawa II TA.2017-2019 Konsultan : PT. WAHANA KRIDA KONSOLINDO

HITUNGAN VOLUME GALIAN, TIMBUNAN DAN PEMADATAN Chart Title

CALCULATION

Galian Timbunan - Pemadatan OGL


Coordinate X Y Coordinate X Y Coordinate
Point XxB YxA Point XxB YxA Point
x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y
0 0
0 0 0
1 21.861 394.821 0.209 0.871 82.518 19.041 1 23.192 394.832 0.695 - 274.408 - 1 5.762 392.984
2 21.652 393.950 1.409 0.871 555.076 18.859 2 22.497 394.832 1.331 0.011 525.521 0.247 2 6.162 394.432
3 20.452 393.950 1.404 (0.850) 553.106 (17.384) 3 21.861 394.821 0.845 0.882 333.624 19.281 3 6.412 394.432
4 20.248 394.800 (0.100) (0.849) (39.480) (17.191) 4 21.652 393.950 0.209 (0.129) 82.336 (2.793) 4 6.471 394.270
5 20.552 394.799 (1.613) (0.021) (636.811) (0.432) 5 21.652 394.950 (1.421) (1.000) (561.224) (21.652) 5 7.985 394.218
6 21.861 394.821 (1.309) (0.022) (516.821) (0.481) 6 23.073 394.950 (1.540) 0.118 (608.223) 2.723 6 11.222 394.217
7 23.192 394.832 (0.119) 0.118 (46.985) 2.737 7 11.712 394.101
8 11.762 394.205
1 10.962 394.217 - 0.017 - 0.186 9 12.012 394.205
2 10.962 394.200 2.700 0.017 1,064.340 0.186 1 20.452 393.950 0.204 (0.850) 80.366 (17.384) 10 12.012 393.518
3 8.262 394.200 2.700 (0.018) 1,064.340 (0.149) 2 20.248 394.800 1.885 (0.855) 744.198 (17.312) 11 12.703 392.827
4 8.262 394.218 (2.700) (0.017) (1,064.389) (0.140) 3 18.567 394.805 2.165 0.115 854.753 2.135 12 13.471 392.735
5 10.962 394.217 (2.700) 0.001 (1,064.386) 0.011 4 18.083 394.685 1.115 0.551 440.074 9.964 13 14.633 392.698
5 17.452 394.254 (0.065) (0.265) (25.627) (4.625) 14 15.781 392.742
6 18.148 394.950 (3.000) (0.696) (1,184.850) (12.631) 15 16.475 392.842
7 20.452 394.950 (2.304) 1.000 (909.965) 20.452 16 17.152 393.518
8 20.452 393.950 - 1.000 - 20.452 17 17.152 394.254
18 17.452 394.254
19 18.083 394.685
1 11.762 394.205 0.050 0.104 19.710 1.223 20 18.567 394.805
2 11.712 394.101 0.540 (0.012) 212.815 (0.141) 21 20.552 394.799
3 11.222 394.217 0.750 (0.116) 295.663 (1.302) 22 22.497 394.832
4 10.962 394.217 0.260 (0.183) 102.496 (2.006) 23 23.192 394.832
5 10.962 394.400 (0.605) (0.183) (238.612) (2.006)
6 11.567 394.400 (0.800) 0.195 (315.520) 2.256
7 11.762 394.205 (0.195) 0.195 (76.870) 2.294

1 8.262 394.218 0.277 - 109.198 -


2 7.985 394.218 1.791 (0.052) 706.044 (0.415)
3 6.471 394.270 1.562 (0.182) 615.850 (1.178)
4 6.423 394.400 (1.791) (0.130) (706.370) (0.835)
5 8.262 394.400 (1.839) 0.182 (725.302) 1.504
6 8.262 394.218 - 0.182 - 1.504

JUMLAH (2.507) 2.507 JUMLAH (2.491) 2.491


LUAS AREA GALIAN (M2) 1.25 LUAS AREA TIMBUNAN-PEMADATAN (M2) 1.25

SKETCH

P.Mg.13 ( Hm.06+66 )

+ 394.95 + 394 .95


B eton Tanpa T ul angan
f'c = 14,5 Mp a
Pasir B at u
+ 394.40
+ 394 .25
+ 393 .95
+ 393 .66 Pa sangan Batu
1 1 ( 1 Pc : 4 pp )
1 1

MA + 39 2.79

+ 392 .39

SKETCH

Chart Title
Galian Timbunan OGL

397

396

395

394

393

392
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Lokasi : SALURAN DRAINASE Status Hitungan : MC-100


No. Propil. : P.M.g.14 Acuan Gambar Rencana : `
Item Kegiatan : Galian - Timbunan - Pemadatan No. Lembar Halaman : 16 of 56
REHABILITASI JARINGAN IRIGASI D.I PROGO MANGGIS Kontrak Nomor : 10/PKK/PJPA.SO/2017

SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC NUSANTARA

Kegiatan Irigasi dan Rawa II TA.2017-2019 Konsultan : PT. WAHANA KRIDA KONSOLINDO

HITUNGAN VOLUME GALIAN, TIMBUNAN DAN PEMADATAN Chart Title

CALCULATION

Galian Timbunan - Pemadatan OGL


Coordinate X Y Coordinate X Y Coordinate
Point XxB YxA Point XxB YxA Point
x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y
0 0
0 0 0
1 21.847 394.782 0.223 0.892 88.04 19.49 1 23.562 394.890 0.155 0.108 61.208 2.545 1 4.363 393.590
2 21.624 393.890 1.423 0.892 560.51 19.29 2 23.407 394.782 1.442 0.111 569.276 2.598 2 4.483 394.267
3 20.424 393.890 1.428 (0.911) 562.47 (18.61) 3 22.120 394.779 1.560 - 615.855 - 3 4.733 394.264
4 20.196 394.801 (1.423) (0.892) (561.80) (18.01) 4 21.847 394.782 0.496 0.889 195.812 19.422 4 4.849 394.136
5 21.847 394.782 (1.651) 0.019 (651.79) 0.42 5 21.624 393.890 0.223 (0.108) 87.837 (2.335) 5 11.613 394.125
6 21.624 394.890 (1.938) (1.000) (765.297) (21.624) 6 11.683 394.237
7 23.562 394.890 (1.938) - (765.297) - 7 11.983 394.237
1 10.883 394.126 - 0.036 - 0.39 8 11.983 393.459
2 10.883 394.090 2.700 0.036 1,064.04 0.39 9 12.698 392.744
3 8.183 394.090 2.700 (0.041) 1,064.04 (0.34) 1 20.424 393.890 0.228 (0.911) 89.807 (18.606) 10 13.536 392.684
4 8.183 394.131 (2.700) (0.036) (1,064.15) (0.29) 2 20.196 394.801 0.852 (0.918) 336.370 (18.540) 11 14.545 392.659
5 10.883 394.126 (2.700) 0.005 (1,064.14) 0.05 3 19.572 394.808 2.013 0.057 794.749 1.116 12 15.751 392.690
4 18.183 394.744 2.148 0.595 847.910 10.819 13 16.465 392.800
5 17.424 394.213 0.082 (0.146) 32.325 (2.544) 14 17.123 393.459
6 18.101 394.890 (3.000) (0.677) (1,184.670) (12.254) 15 17.123 394.213
7 20.424 394.890 (2.323) 1.000 (917.329) 20.424 16 17.424 394.213
8 20.424 393.890 - 1.000 - 20.424 17 18.183 394.744
18 19.572 394.808
19 22.120 394.779
1 11.683 394.237 0.070 0.112 27.597 1.308 20 23.407 394.782
2 11.613 394.125 0.800 0.111 315.300 1.289 21 24.104 395.267
3 10.883 394.126 0.730 (0.165) 287.712 (1.796)
4 10.883 394.290 (0.747) (0.164) (294.535) (1.785)
5 11.630 394.290 (0.800) 0.053 (315.432) 0.616
6 11.683 394.237 (0.053) 0.053 (20.895) 0.619

1 8.183 394.131 3.334 (0.005) 1,314.033 (0.041)


2 4.849 394.136 3.450 (0.133) 1,359.769 (0.645)
3 4.733 394.264 0.090 (0.154) 35.484 (0.729)
4 4.759 394.290 (3.450) (0.026) (1,360.301) (0.124)
5 8.183 394.290 (3.424) 0.159 (1,350.049) 1.301
6 8.183 394.131 - 0.159 - 1.301

JUMLAH (2.778) 2.778 JUMLAH (2.760) 2.760


LUAS AREA GALIAN (M2) 1.39 LUAS AREA TIMBUNAN-PEMADATAN (M2) 1.38

SKETCH

P.Mg.14 ( Hm.07+ 16 )

+ 394.89 + 394.89
Be ton Tanpa Tulangan
f 'c = 14,5 Mpa
Pasir Ba tu
+ 394.29 + 394.19
+ 393.89
+ 393.60 Pa san g an B atu
1 1
( 1 P c : 4 pp )
1 1

MA + 392.73

+ 392.33

SKETCH

Chart Title
Galian Timbunan OGL

397

396

395

394

393

392

391
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

Lokasi : SALURAN DRAINASE Status Hitungan : MC-100


No. Propil. : P.Mg.15 Acuan Gambar Rencana : `
Item Kegiatan : Galian - Timbunan - Pemadatan No. Lembar Halaman : 17 of 56
REHABILITASI JARINGAN IRIGASI D.I PROGO MANGGIS Kontrak Nomor : 10/PKK/PJPA.SO/2017

SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC NUSANTARA

Kegiatan Irigasi dan Rawa II TA.2017-2019 Konsultan : PT. WAHANA KRIDA KONSOLINDO

HITUNGAN VOLUME GALIAN, TIMBUNAN DAN PEMADATAN Chart Title

CALCULATION

Galian Timbunan - Pemadatan OGL


Coordinate X Y Coordinate X Y Coordinate
Point XxB YxA Point XxB YxA Point
x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y
0 0
0 0 0
1 21.800 394.449 0.172 0.689 67.845 15.020 1 22.778 394.435 0.978 (0.014) 385.757 (0.319) 1 6.518 393.304
2 21.628 393.760 1.372 0.689 540.239 14.902 2 21.800 394.449 1.150 0.675 453.616 14.715 2 6.718 394.130
3 20.428 393.760 1.412 (0.850) 555.989 (17.364) 3 21.628 393.760 0.172 (0.311) 67.727 (6.726) 3 6.874 394.130
4 20.216 394.610 (1.077) (0.693) (424.995) (14.010) 4 21.628 394.760 (0.825) (1.000) (325.677) (21.628) 4 7.091 394.003
5 21.505 394.453 (1.584) 0.161 (624.814) 3.462 5 22.453 394.760 (1.150) 0.325 (453.974) 7.297 5 11.277 393.990
6 21.800 394.449 (0.295) 0.004 (116.362) 0.087 6 22.778 394.435 (0.325) 0.325 (128.191) 7.403 6 11.668 394.130
7 11.718 394.211
8 11.968 394.211
1 10.918 393.991 - 0.021 - 0.229 1 20.428 393.760 0.212 (0.850) 83.477 (17.364) 9 11.968 393.409
2 10.918 393.970 2.700 0.021 1,063.719 0.229 2 20.216 394.610 0.250 (0.855) 98.653 (17.285) 10 12.582 392.794
3 8.218 393.970 2.700 (0.029) 1,063.719 (0.238) 3 20.178 394.615 1.204 (0.057) 475.116 (1.150) 11 13.566 392.684
4 8.218 393.999 (2.700) (0.021) (1,063.797) (0.173) 4 19.012 394.667 2.217 (0.020) 874.977 (0.380) 12 14.515 392.621
5 10.918 393.991 (2.700) 0.008 (1,063.776) 0.087 5 17.961 394.635 1.584 0.435 625.102 7.813 13 15.558 392.681
6 17.428 394.232 0.005 (0.125) 1.971 (2.179) 14 16.494 392.794
7 17.956 394.760 (3.000) (0.528) (1,184.280) (9.481) 15 17.108 393.409
8 20.428 394.760 (2.472) 1.000 (975.847) 20.428 16 17.108 394.232
9 20.428 393.760 - 1.000 - 20.428 17 17.428 394.232
18 17.961 394.635
19 19.012 394.667
1 11.693 394.171 0.025 0.041 9.854 0.479 20 20.178 394.615
2 11.668 394.130 0.416 0.181 163.958 2.112 21 21.505 394.453
3 11.277 393.990 0.750 0.139 295.493 1.568 22 22.778 394.435
4 10.918 393.991 0.359 (0.180) 141.443 (1.965)
5 10.918 394.170 (0.775) (0.180) (305.482) (1.965)
6 11.693 394.171 (0.775) (0.001) (305.483) (0.012)

1 8.218 393.999 1.127 (0.004) 444.037 (0.033)


2 7.091 394.003 1.344 (0.131) 529.540 (0.929)
3 6.874 394.130 0.177 (0.167) 69.761 (1.148)
4 6.914 394.170 (1.344) (0.040) (529.764) (0.277)
5 8.218 394.170 (1.304) 0.171 (513.998) 1.405
6 8.218 393.999 - 0.171 - 1.405

JUMLAH (2.233) 2.233 JUMLAH (2.214) 2.214


LUAS AREA GALIAN (M2) 1.12 LUAS AREA TIMBUNAN-PEMADATAN (M2) 1.11

SKETCH

P.Mg.15 ( Hm.07+66 )

+ 394.76 + 394.76
Beton Tanpa Tulanga n
f' c = 14,5 Mpa
Pasir Batu
+ 394.17
+ 394.06
+ 393.76
+ 393.55
1 1 Pasangan Ba tu
1 1 ( 1 Pc : 4 pp )

MA + 392.68

+ 392.28

SKETCH

Chart Title
Galian Timbunan OGL

395

394

393

392

391
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Lokasi : SALURAN DRAINASE Status Hitungan : MC-100


No. Propil. : P.Mg.16 Acuan Gambar Rencana : `
Item Kegiatan : Galian - Timbunan - Pemadatan No. Lembar Halaman : 18 of 56
REHABILITASI JARINGAN IRIGASI D.I PROGO MANGGIS Kontrak Nomor : 10/PKK/PJPA.SO/2017

SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC NUSANTARA

Kegiatan Irigasi dan Rawa II TA.2017-2019 Konsultan : PT. WAHANA KRIDA KONSOLINDO

HITUNGAN VOLUME GALIAN, TIMBUNAN DAN PEMADATAN Chart Title

CALCULATION

Galian Timbunan - Pemadatan OGL


Coordinate X Y Coordinate X Y Coordinate
Point XxB YxA Point XxB YxA Point
x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y
0 0
0 0 0
1 21.828 393.724 0.125 0.624 49.216 13.621 1 22.250 394.100 0.422 0.376 166.310 8.366 1 6.323 393.860
2 21.703 393.100 1.325 0.624 520.858 13.543 2 21.828 393.724 0.547 1.000 215.367 21.828 2 6.423 394.151
3 20.503 393.100 1.281 (0.406) 503.561 (8.324) 3 21.703 393.100 0.125 (0.376) 49.138 (8.160) 3 6.653 394.154
4 20.422 393.506 (1.100) (0.424) (432.857) (8.659) 4 21.703 394.100 (0.547) (1.000) (215.573) (21.703) 4 6.843 394.033
5 21.603 393.524 (1.406) (0.218) (553.295) (4.709) 5 22.250 394.100 (0.547) - (215.573) - 5 11.653 394.033
6 21.828 393.724 (0.225) (0.200) (88.588) (4.366) 6 11.773 394.246
7 12.013 394.246
1 20.503 393.100 0.081 (0.406) 31.841 (8.324) 8 12.013 393.359
1 19.268 394.150 1.765 - 695.675 - 2 20.422 393.506 0.850 (0.394) 334.480 (8.046) 9 12.627 392.744
2 17.503 394.150 1.115 (0.506) 439.477 (8.857) 3 19.653 393.494 1.154 (0.644) 454.092 (12.657) 10 13.386 392.619
3 18.153 394.656 (1.467) (0.506) (578.960) (9.185) 4 19.268 394.150 (0.800) (0.656) (315.320) (12.640) 11 14.521 392.585
4 18.970 394.656 (1.115) 0.506 (440.041) 9.599 5 20.453 394.150 (1.235) 0.050 (486.775) 1.023 12 15.941 392.636
5 19.268 394.150 (0.298) 0.506 (117.457) 9.750 6 20.503 394.100 (0.050) 1.050 (19.705) 21.528 13 16.649 392.855
7 20.503 393.100 - 1.000 - 20.503 14 17.153 393.359
15 17.153 394.150
1 11.153 394.033 - 0.023 - 0.257 16 17.503 394.150
2 11.153 394.010 2.700 0.023 1,063.827 0.257 1 11.753 394.210 0.100 0.177 39.421 2.080 17 18.153 394.656
3 8.453 394.010 2.700 (0.023) 1,063.827 (0.194) 2 11.653 394.033 0.600 0.177 236.420 2.063 18 18.970 394.656
4 8.453 394.033 (2.700) (0.023) (1,063.889) (0.194) 3 11.153 394.033 0.500 (0.177) 197.017 (1.974) 19 19.653 393.494
5 11.153 394.033 (2.700) - (1,063.889) - 4 11.153 394.210 (0.600) (0.177) (236.526) (1.974) 20 21.603 393.524
5 11.753 394.210 (0.600) - (236.526) - 21 23.353 395.083

1 8.453 394.210 - 0.177 - 1.496


2 8.453 394.033 1.610 0.177 634.393 1.496
3 6.843 394.033 1.800 (0.121) 709.259 (0.828)
4 6.653 394.154 0.134 (0.177) 52.817 (1.178)
5 6.709 394.210 (1.800) (0.056) (709.578) (0.376)
6 8.453 394.210 (1.744) - (687.502) -

JUMLAH (2.536) 2.536 JUMLAH (2.523) 2.523


LUAS AREA GALIAN (M2) 1.27 LUAS AREA TIMBUNAN-PEMADATAN (M2) 1.26

SKETCH

P.Mg.16 ( Hm.08+16 )

Beton Tan pa Tula nga n


f'c = 1 4,5 Mpa Pasi r B at u
+ 394.21 + 394.15 + 394.10

+ 393.50 + 393.40
1 1
1 1

+ 393.10
Pasan gan Batu
MA + 392.43 ( 1 Pc : 4 pp )

+ 392.23

SKETCH

Chart Title
Galian Timbunan OGL

396

395

394

393

392

391
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Lokasi : SALURAN DRAINASE Status Hitungan : MC-100


No. Propil. : P.Mg.17 Acuan Gambar Rencana : `
Item Kegiatan : Galian - Timbunan - Pemadatan No. Lembar Halaman : 19 of 56
REHABILITASI JARINGAN IRIGASI D.I PROGO MANGGIS Kontrak Nomor : 10/PKK/PJPA.SO/2017

SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC NUSANTARA

Kegiatan Irigasi dan Rawa II TA.2017-2019 Konsultan : PT. WAHANA KRIDA KONSOLINDO

HITUNGAN VOLUME GALIAN, TIMBUNAN DAN PEMADATAN Chart Title

CALCULATION

Galian Timbunan - Pemadatan OGL


Coordinate X Y Coordinate X Y Coordinate
Point XxB YxA Point XxB YxA Point
x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y
0 0
0 0 0
1 18.562 393.757 0.135 0.807 53.16 14.98 1 19.321 393.950 0.277 0.208 109.12 4.019 1 4.073 393.783
2 18.427 392.950 1.335 0.807 524.59 14.87 2 19.044 393.742 0.759 0.193 298.85 3.675 2 7.894 393.776
3 17.227 392.950 1.342 (0.854) 527.34 (14.71) 3 18.562 393.757 0.617 0.792 242.95 14.701 3 8.213 393.951
4 17.085 393.804 (1.335) (0.807) (525.73) (13.79) 4 18.427 392.950 0.135 (0.193) 53.05 (3.556) 4 8.253 394.125
5 18.562 393.757 (1.477) 0.047 (581.58) 0.87 5 18.427 393.950 (0.894) (1.000) (352.19) (18.427) 5 8.553 394.121
6 19.321 393.950 (0.894) - (352.19) - 6 8.553 393.299
7 9.117 392.734
1 7.753 393.776 - 0.026 - 0.20 8 10.052 392.579
2 7.753 393.750 2.700 0.026 1,063.13 0.20 1 17.227 392.950 0.142 (0.854) 55.799 (14.712) 9 11.153 392.566
3 5.053 393.750 2.700 (0.031) 1,063.13 (0.16) 2 17.085 393.804 0.484 (0.864) 190.601 (14.761) 10 12.439 392.598
4 5.053 393.781 (2.700) (0.026) (1,063.21) (0.13) 3 16.743 393.814 1.942 (0.142) 764.787 (2.378) 11 13.187 392.793
5 7.753 393.776 (2.700) 0.005 (1,063.20) 0.04 4 15.143 393.946 2.250 (0.220) 886.379 (3.331) 12 13.693 393.299
5 14.493 394.034 1.130 (0.204) 445.258 (2.957) 13 13.693 394.148
6 14.013 394.150 (2.534) (0.116) (998.776) (1.626) 14 14.013 394.150
7 17.027 394.150 (3.214) 0.200 (1,266.798) 3.405 15 14.493 394.034
8 17.227 393.950 (0.200) 1.200 (78.790) 20.672 16 15.143 393.946
9 17.227 392.950 - 1.000 - 17.227 17 16.743 393.814
18 19.044 393.742
19 19.595 394.156
1 8.211 393.950 0.317 0.174 124.882 1.429
2 7.894 393.776 0.458 0.174 180.349 1.374
3 7.753 393.776 0.141 (0.174) 55.522 (1.349)
4 7.753 393.950 (0.458) (0.174) (180.429) (1.349)
5 8.211 393.950 (0.458) - (180.429) -

1 5.053 393.950 - 0.169 - 0.854


2 5.053 393.781 0.980 0.167 385.905 0.844
3 4.073 393.783 0.813 (0.169) 320.146 (0.688)
4 4.240 393.950 (0.980) (0.167) (386.071) (0.708)
5 5.053 393.950 (0.813) - (320.281) -

JUMLAH (2.377) 2.377 JUMLAH (2.358) 2.358


LUAS AREA GALIAN (M2) 1.19 LUAS AREA TIMBUNAN-PEMADATAN (M2) 1.18

SKETCH

P.Mg.17 ( Hm.08+66 )

Be ton Ta npa Tula ng an


f' c = 1 4,5 Mpa
Pa sir Batu
+ 394.15
+ 393.95 + 393.95

+ 393.44
1
1 1
1
+ 393.25
+ 392.95
MA + 392.57 Pasangan Batu
( 1 Pc : 4 pp )

+ 392.17

SKETCH

Chart Title
Galian Timbunan OGL

395

394

393

392

391
4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Lokasi : SALURAN DRAINASE Status Hitungan : MC-100


No. Propil. : P.Mg.18 Acuan Gambar Rencana : `
Item Kegiatan : Galian - Timbunan - Pemadatan No. Lembar Halaman : 20 of 56
REHABILITASI JARINGAN IRIGASI D.I PROGO MANGGIS Kontrak Nomor : 10/PKK/PJPA.SO/2017

SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC NUSANTARA

Kegiatan Irigasi dan Rawa II TA.2017-2019 Konsultan : PT. WAHANA KRIDA KONSOLINDO

HITUNGAN VOLUME GALIAN, TIMBUNAN DAN PEMADATAN Chart Title

CALCULATION

Galian Timbunan - Pemadatan OGL


Coordinate X Y Coordinate X Y Coordinate
Point XxB YxA Point XxB YxA Point
x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y
0 0
0 0 0
1 18.486 393.536 0.137 0.826 53.914 15.269 1 19.885 393.514 1.399 (0.022) 550.526 (0.437) 1 3.105 393.607
2 18.349 392.710 1.337 0.826 525.053 15.156 2 18.486 393.536 1.536 0.804 604.471 14.863 2 7.446 393.615
3 17.149 392.710 1.342 (0.849) 527.017 (14.560) 3 18.349 392.710 0.137 (0.174) 53.801 (3.193) 3 8.055 393.434
4 17.007 393.559 (0.570) (0.838) (224.329) (14.252) 4 18.349 393.710 (1.340) (1.000) (527.571) (18.349) 4 8.705 392.907
5 17.719 393.548 (1.479) 0.023 (582.057) 0.408 5 19.689 393.710 (1.536) 0.196 (604.739) 3.859 5 9.548 392.064
6 18.486 393.536 (0.767) 0.012 (301.842) 0.222 6 19.885 393.514 (0.196) 0.196 (77.129) 3.897 6 10.309 392.011
7 11.070 391.965
8 12.039 392.002
1 13.991 393.118 0.078 0.078 30.663 1.091 1 17.149 392.710 0.142 (0.849) 55.765 (14.560) 9 12.801 392.087
2 13.913 393.040 0.128 0.078 50.309 1.085 2 17.007 393.559 2.058 (0.879) 809.944 (14.949) 10 13.585 392.870
3 13.863 393.040 (0.078) (0.078) (30.657) (1.081) 3 15.091 393.589 2.522 0.140 992.631 2.113 11 14.485 393.419
4 13.991 393.118 (0.128) (0.078) (50.319) (1.091) 4 14.485 393.419 1.100 0.471 432.761 6.822 12 15.091 393.589
5 13.991 393.118 (0.098) (0.291) (38.526) (4.071) 13 19.885 393.514
6 14.583 393.710 (3.158) (0.592) (1,243.336) (8.633)
1 8.541 393.040 0.128 - 50.309 - 7 17.149 393.710 (2.566) 1.000 (1,010.260) 17.149
2 8.413 393.040 0.537 (0.409) 211.062 (3.441) 8 17.149 392.710 - 1.000 - 17.149
3 8.004 393.449 0.358 (0.394) 140.855 (3.154)
4 8.055 393.434 (0.537) 0.409 (211.274) 3.294
5 8.541 393.040 (0.486) 0.394 (191.017) 3.365 1 8.004 393.449 0.558 (0.166) 219.545 (1.329)
2 7.446 393.615 0.831 (0.165) 327.094 (1.229)
3 7.173 393.614 0.272 (0.174) 107.063 (1.248)
1 7.173 393.614 - 0.025 - 0.179 4 7.174 393.789 (0.491) (0.175) (193.350) (1.255)
2 7.173 393.589 2.700 0.025 1,062.690 0.179 5 7.664 393.789 (0.830) 0.340 (326.845) 2.606
3 4.473 393.589 2.700 (0.020) 1,062.690 (0.089) 6 8.004 393.449 (0.340) 0.340 (133.773) 2.721
4 4.473 393.609 (2.700) (0.025) (1,062.744) (0.112)
5 7.173 393.614 (2.700) (0.005) (1,062.758) (0.036)
1 4.473 393.609 1.368 0.002 538.457 0.009
2 3.105 393.607 1.186 (0.180) 466.818 (0.559)
3 3.287 393.789 (1.368) (0.182) (538.703) (0.598)
4 4.473 393.789 (1.186) 0.180 (467.034) 0.805
5 4.473 393.609 - 0.180 - 0.805

JUMLAH (2.434) 2.434 JUMLAH (2.388) 2.388


LUAS AREA GALIAN (M2) 1.22 LUAS AREA TIMBUNAN-PEMADATAN (M2) 1.19

SKETCH

P.Mg.18 ( Hm.09+16 )

Beton Tanpa Tulangan


f'c = 14,5 Mpa
Pasir Batu
+ 394.01 + 393.71 + 393.71

+ 393.04 + 393.01
1
1
+ 392.71
MA + 392.29 Pasan gan Ba tu
( 1 Pc : 4 pp )

+ 391.89

SKETCH

Chart Title
Galian Timbunan OGL

395

394

393

392

391
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Lokasi : SALURAN DRAINASE Status Hitungan : MC-100


No. Propil. : P.Mg.19 Acuan Gambar Rencana : `
Item Kegiatan : Galian - Timbunan - Pemadatan No. Lembar Halaman : 21 of 56
REHABILITASI JARINGAN IRIGASI D.I PROGO MANGGIS Kontrak Nomor : 10/PKK/PJPA.SO/2017

SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC NUSANTARA

Kegiatan Irigasi dan Rawa II TA.2017-2019 Konsultan : PT. WAHANA KRIDA KONSOLINDO

HITUNGAN VOLUME GALIAN, TIMBUNAN DAN PEMADATAN Chart Title

CALCULATION

Galian Timbunan - Pemadatan OGL


Coordinate X Y Coordinate X Y Coordinate
Point XxB YxA Point XxB YxA Point
x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y
0 0
0 0 0
1 21.857 393.358 0.222 0.888 87.325 19.409 1 23.383 393.371 1.185 - 466.145 - 1 5.783 392.355
2 21.635 392.470 1.422 0.888 558.092 19.212 2 22.198 393.371 1.526 0.013 600.284 0.289 2 5.963 393.608
3 20.435 392.470 1.412 (0.850) 554.168 (17.370) 3 21.857 393.358 0.563 0.901 221.461 19.693 3 6.203 393.607
4 20.223 393.320 (0.566) (0.853) (222.619) (17.250) 4 21.635 392.470 0.222 (0.112) 87.128 (2.423) 4 6.318 393.453
5 21.001 393.323 (1.634) (0.038) (642.690) (0.798) 5 21.635 393.470 (1.649) (1.000) (648.832) (21.635) 5 11.369 393.460
6 21.857 393.358 (0.856) (0.035) (336.714) (0.765) 6 23.284 393.470 (1.748) 0.099 (687.786) 2.305 6 12.193 392.729
7 23.383 393.371 (0.099) 0.099 (38.944) 2.315 7 12.880 392.042
8 13.592 391.943
1 11.966 392.930 0.133 - 52.260 - 9 14.583 391.912
2 11.833 392.930 0.663 (0.530) 260.513 (6.271) 1 20.435 393.470 - 1.000 - 20.435 10 15.540 391.936
3 11.303 393.460 0.464 (0.530) 182.565 (5.991) 2 20.435 392.470 0.212 0.150 83.204 3.065 11 16.306 392.062
4 11.369 393.460 (0.663) 0.530 (260.864) 6.026 3 20.223 393.320 1.322 (0.846) 519.969 (17.109) 12 16.980 392.735
5 11.966 392.930 (0.597) 0.530 (234.579) 6.342 4 19.113 393.316 2.470 0.192 971.491 3.670 13 17.753 393.128
5 17.753 393.128 1.780 0.401 699.768 7.119 14 19.113 393.316
6 17.333 392.915 0.420 0.198 165.024 3.432 15 21.001 393.323
1 10.633 393.459 - 0.029 - 0.308 7 17.333 392.930 (0.540) (0.555) (212.182) (9.620) 16 22.198 393.371
2 10.633 393.430 2.700 0.029 1,062.261 0.308 8 17.873 393.470 (3.102) (0.540) (1,220.544) (9.651) 17 23.383 393.371
3 7.933 393.430 2.700 (0.025) 1,062.261 (0.198) 9 20.435 393.470 (2.562) - (1,008.070) -
4 7.933 393.455 (2.700) (0.029) (1,062.329) (0.230)
5 10.633 393.459 (2.700) (0.004) (1,062.339) (0.043)
1 11.303 393.460 0.670 0.001 263.618 0.011
2 10.633 393.459 0.670 (0.170) 263.618 (1.808)
3 10.633 393.630 (0.500) (0.171) (196.815) (1.818)
4 11.133 393.630 (0.670) 0.170 (263.732) 1.893
5 11.303 393.460 (0.170) 0.170 (66.888) 1.922

1 7.933 393.455 1.615 0.002 635.430 0.016


2 6.318 393.453 1.730 (0.152) 680.674 (0.960)
3 6.203 393.607 0.092 (0.177) 36.212 (1.098)
4 6.226 393.630 (1.730) (0.023) (680.980) (0.143)
5 7.933 393.630 (1.707) 0.175 (671.926) 1.388
6 7.933 393.455 - 0.175 - 1.388

JUMLAH (2.689) 2.689 JUMLAH (2.675) 2.675


LUAS AREA GALIAN (M2) 1.34 LUAS AREA TIMBUNAN-PEMADATAN (M2) 1.34

SKETCH

P.Mg.19 ( Hm.09+66 )

B eton Tan pa Tul ang an


f'c = 14,5 Mpa
P asir Ba tu
+ 393.63
+ 393.47 + 393.47

+ 392.93
1
1
+ 392.77
+ 392.47
MA + 392.18
Pasangan Batu
( 1 Pc : 4 pp )

+ 391.78

SKETCH

Chart Title
Galian Timbunan OGL

396

395

394

393

392

391
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Lokasi : SALURAN DRAINASE Status Hitungan : MC-100


No. Propil. : P.Mg.20 Acuan Gambar Rencana : `
Item Kegiatan : Galian - Timbunan - Pemadatan No. Lembar Halaman : 22 of 56
REHABILITASI JARINGAN IRIGASI D.I PROGO MANGGIS Kontrak Nomor : 10/PKK/PJPA.SO/2017

SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC NUSANTARA

Kegiatan Irigasi dan Rawa II TA.2017-2019 Konsultan : PT. WAHANA KRIDA KONSOLINDO

HITUNGAN VOLUME GALIAN, TIMBUNAN DAN PEMADATAN Chart Title

CALCULATION

Galian Timbunan - Pemadatan OGL


Coordinate X Y Coordinate X Y Coordinate
Point XxB YxA Point XxB YxA Point
x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y
0 0
0 0 0
1 21.337 392.964 0.186 0.744 73.091 15.875 1 22.135 393.220 0.025 0.022 9.831 0.487 1 5.700 392.414
2 21.151 392.220 1.386 0.744 543.617 15.736 2 22.110 393.198 0.544 0.259 213.900 5.726 2 5.880 393.431
3 19.951 392.220 1.388 (0.751) 544.401 (14.983) 3 21.591 392.961 0.773 0.234 303.759 5.052 3 6.160 393.439
4 19.763 392.971 (0.591) (0.752) (232.246) (14.862) 4 21.337 392.964 0.440 0.741 172.904 15.811 4 6.250 393.274
5 20.542 392.972 (1.574) 0.007 (618.538) 0.144 5 21.151 392.220 0.186 (0.256) 72.953 (5.415) 5 11.720 393.274
6 21.337 392.964 (0.795) 0.008 (312.406) 0.171 6 21.151 393.220 (0.984) (1.000) (386.928) (21.151) 6 12.560 392.582
7 22.135 393.220 (0.984) - (386.928) - 7 13.241 391.901
8 13.828 391.799
1 12.235 392.850 0.102 - 40.071 - 9 14.561 391.765
2 12.133 392.850 0.526 (0.424) 206.639 (5.144) 1 19.951 392.220 0.188 (0.751) 73.737 (14.983) 10 15.250 391.782
3 11.709 393.274 0.413 (0.424) 162.422 (4.965) 2 19.763 392.971 1.254 (0.749) 492.786 (14.802) 11 15.867 391.843
4 11.720 393.274 (0.526) 0.424 (206.862) 4.969 3 18.697 392.969 2.304 0.030 905.401 0.561 12 16.800 392.775
5 12.235 392.850 (0.515) 0.424 (202.318) 5.188 4 17.459 392.941 1.664 0.182 653.854 3.178 13 17.000 392.775
5 17.033 392.787 0.426 0.091 167.327 1.550 14 17.459 392.941
6 17.033 392.850 (0.370) (0.433) (145.354) (7.375) 15 18.697 392.969
7 17.403 393.220 (2.918) (0.370) (1,147.416) (6.439) 16 20.543 392.972
8 19.951 393.220 (2.548) 1.000 (1,001.925) 19.951 17 21.591 392.961
9 19.951 392.220 - 1.000 - 19.951 18 22.110 393.198
19 22.880 393.877

1 11.709 393.274 0.776 - 305.181 -


2 10.933 393.274 0.776 (0.200) 305.181 (2.187)
3 10.933 393.474 (0.576) (0.200) (226.641) (2.187)
4 11.509 393.474 (0.776) 0.200 (305.336) 2.302
5 11.709 393.274 (0.200) 0.200 (78.655) 2.342

1 8.233 393.274 1.983 - 779.862 -


2 6.250 393.274 2.073 (0.165) 815.257 (1.031)
3 6.160 393.439 0.055 (0.200) 21.639 (1.232)
4 6.195 393.474 (2.073) (0.035) (815.672) (0.217)
5 8.233 393.474 (2.038) 0.200 (801.900) 1.647
6 8.233 393.274 - 0.200 - 1.647

JUMLAH (2.128) 2.128 JUMLAH (3.185) 3.185


LUAS AREA GALIAN (M2) 1.06 LUAS AREA TIMBUNAN-PEMADATAN (M2) 1.59

SKETCH

P.Mg.20 ( Hm.10+16 )

Beton Tanpa Tula ngan


f 'c = 14, 5 Mpa
Pas ir Batu
+ 393.47
+ 393.22 + 393.22

+ 392.85
1 1
1 1 + 392.52
MA + 392.10 + 392.22
Pasan gan Bat u
( 1 Pc : 4 pp )
+ 391.70

SKETCH

Chart Title
Galian Timbunan OGL

396

395

394

393

392

391
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Lokasi : SALURAN DRAINASE Status Hitungan : MC-100


No. Propil. : P.Mg.21 Acuan Gambar Rencana : `
Item Kegiatan : Galian - Timbunan - Pemadatan No. Lembar Halaman : 23 of 56
REHABILITASI JARINGAN IRIGASI D.I PROGO MANGGIS Kontrak Nomor : 10/PKK/PJPA.SO/2017

SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC NUSANTARA

Kegiatan Irigasi dan Rawa II TA.2017-2019 Konsultan : PT. WAHANA KRIDA KONSOLINDO

HITUNGAN VOLUME GALIAN, TIMBUNAN DAN PEMADATAN Chart Title

CALCULATION

Galian Timbunan - Pemadatan OGL


Coordinate X Y Coordinate X Y Coordinate
Point XxB YxA Point XxB YxA Point
x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y
0 0
0 0 0
1 21.160 392.614 0.105 0.634 41.224 13.415 1 22.611 392.980 0.172 0.073 67.593 1.651 1 7.189 393.354
2 21.055 391.980 1.305 0.634 511.534 13.349 2 22.439 392.907 1.274 0.366 500.564 8.213 2 7.189 393.354
3 19.855 391.980 1.309 (0.653) 513.102 (12.965) 3 21.337 392.614 1.279 0.293 502.153 6.252 3 7.489 393.364
4 19.746 392.633 0.049 (0.632) 19.239 (12.479) 4 21.160 392.614 0.282 0.634 110.717 13.415 4 7.636 393.121
5 19.806 392.612 (1.414) 0.019 (555.153) 0.376 5 21.055 391.980 0.105 (0.366) 41.158 (7.706) 5 11.565 393.118
6 21.160 392.614 (1.354) (0.002) (531.599) (0.042) 6 21.055 392.980 (1.556) (1.000) (611.477) (21.055) 6 11.964 392.973
7 22.611 392.980 (1.556) - (611.477) - 7 12.369 392.503
8 12.569 392.503
1 12.114 392.799 0.188 (0.188) 73.846 (2.277) 9 13.288 391.783
2 11.926 392.987 0.150 (0.174) 58.948 (2.075) 1 19.855 391.980 0.109 (0.653) 42.726 (12.965) 10 13.809 391.699
3 11.964 392.973 (0.188) 0.188 (73.879) 2.249 2 19.746 392.633 0.789 (0.896) 309.787 (17.692) 11 14.571 391.681
4 12.114 392.799 (0.150) 0.174 (58.920) 2.108 3 19.066 392.876 2.157 (0.241) 847.434 (4.595) 12 15.299 391.704
4 17.589 392.874 2.033 0.098 798.713 1.724 13 15.876 391.782
5 17.033 392.778 0.556 0.094 218.385 1.601 14 16.839 392.744
6 17.033 392.780 (0.200) (0.202) (78.556) (3.441) 15 17.589 392.874
7 17.233 392.980 (2.822) (0.200) (1,108.990) (3.447) 16 19.066 392.876
8 19.855 392.980 (2.622) 1.000 (1,030.394) 19.855 17 19.806 392.612
9 19.855 391.980 - 1.000 - 19.855 18 21.337 392.614
19 22.439 392.907
20 22.889 393.099
1 11.926 392.987 0.361 (0.131) 141.868 (1.562)
2 11.565 393.118 0.993 (0.132) 390.366 (1.527)
3 10.933 393.119 0.632 (0.200) 248.451 (2.187)
4 10.933 393.318 (0.662) (0.199) (260.377) (2.176)
5 11.595 393.318 (0.993) 0.331 (390.565) 3.838
6 11.926 392.987 (0.331) 0.331 (130.079) 3.948

1 8.233 393.121 0.597 - 234.693 -


2 7.636 393.121 0.717 (0.197) 281.868 (1.504)
3 7.516 393.318 (0.597) (0.197) (234.811) (1.481)
4 8.233 393.318 (0.717) 0.197 (282.009) 1.622
5 8.233 393.121 - 0.197 - 1.622

JUMLAH (1.658) 1.658 JUMLAH (2.257) 2.257


LUAS AREA GALIAN (M2) 0.83 LUAS AREA TIMBUNAN-PEMADATAN (M2) 1.13

SKETCH

P.Mg.21 ( Hm.10+66 )

Beton Ta npa Tulan gan


f'c = 14,5 Mpa
Pas ir Batu
+ 393.32
+ 392.98 + 392.98
+ 392.78
1 1
1 1

MA + 392.03 + 392.28
+ 391.98
+ 391.63 Pas ang an Batu
( 1 Pc : 4 pp )

SKETCH

Chart Title
Galian Timbunan OGL

395

394

393

392

391
7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Lokasi : SALURAN DRAINASE Status Hitungan : MC-100


No. Propil. : P.Mg.22 Acuan Gambar Rencana : `
Item Kegiatan : Galian - Timbunan - Pemadatan No. Lembar Halaman : 24 of 56
REHABILITASI JARINGAN IRIGASI D.I PROGO MANGGIS Kontrak Nomor : 10/PKK/PJPA.SO/2017

SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC NUSANTARA

Kegiatan Irigasi dan Rawa II TA.2017-2019 Konsultan : PT. WAHANA KRIDA KONSOLINDO

HITUNGAN VOLUME GALIAN, TIMBUNAN DAN PEMADATAN Chart Title

CALCULATION

Galian Timbunan - Pemadatan OGL


Coordinate X Y Coordinate X Y Coordinate
Point XxB YxA Point XxB YxA Point
x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y
0 0
0 0 0
1 19.721 393.060 1.335 - 524.735 - 1 18.386 393.060 0.868 0.120 341.176 2.206 1 7.398 391.200
2 18.386 393.060 0.103 (0.170) 40.485 (3.126) 2 17.518 392.940 1.304 0.301 512.394 5.273 2 7.568 393.086
3 19.618 393.230 (1.335) - (524.962) - 3 17.082 392.759 0.135 (0.120) 53.022 (2.050) 3 7.818 393.086
4 19.721 393.060 (0.103) 0.170 (40.485) 3.353 4 17.383 393.060 (1.304) (0.301) (512.550) (5.232) 4 7.848 392.983
5 18.386 393.060 (1.003) - (394.239) - 5 11.797 392.983
6 11.981 392.883
1 17.082 392.759 0.049 0.049 19.245 0.837 7 12.318 392.484
2 17.033 392.710 0.081 0.049 31.810 0.835 1 11.936 392.908 0.139 (0.075) 54.614 (0.895) 8 12.518 392.484
3 17.001 392.710 (0.035) (0.043) (13.745) (0.731) 2 11.797 392.983 1.003 (0.075) 394.162 (0.885) 9 13.184 391.818
4 17.068 392.753 (0.081) (0.049) (31.813) (0.836) 3 10.933 392.983 0.864 (0.200) 339.537 (2.187) 10 13.623 391.668
5 17.082 392.759 (0.014) (0.006) (5.499) (0.102) 4 10.933 393.183 (0.727) (0.200) (285.844) (2.187) 11 14.646 391.650
5 11.660 393.183 (1.003) 0.275 (394.363) 3.206 12 15.542 391.694
6 11.936 392.908 (0.276) 0.275 (108.443) 3.282 13 16.006 391.842
1 12.093 392.750 0.157 (0.158) 61.662 (1.911) 14 16.648 392.483
2 11.936 392.908 0.112 (0.133) 44.006 (1.587) 15 17.068 392.753
3 11.981 392.883 (0.157) 0.158 (61.683) 1.893 1 8.233 392.983 0.385 - 151.298 - 16 17.518 392.940
4 12.093 392.750 (0.112) 0.133 (43.988) 1.608 2 7.848 392.983 0.415 (0.103) 163.088 (0.808) 17 19.618 393.230
3 7.818 393.086 (0.067) (0.200) (26.337) (1.564) 18 19.958 392.670
4 7.915 393.183 (0.415) (0.097) (163.171) (0.768)
5 8.233 393.183 (0.318) 0.200 (125.032) 1.647
6 8.233 392.983 - 0.200 - 1.647

JUMLAH (0.232) 0.232 JUMLAH (0.686) 0.686


LUAS AREA GALIAN (M2) 0.12 LUAS AREA TIMBUNAN-PEMADATAN (M2) 0.34

SKETCH

P.Mg.22 ( Hm.11+16 )

Be ton Tanpa Tulangan


f'c = 14,5 Mp a
Pasir Ba tu
+ 393.18
+ 393.06
+ 392.71
1 1
1 1

MA + 391.96

+ 391.56

SKETCH

Chart Title
Galian Timbunan OGL

395

394

393

392

391
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

Lokasi : SALURAN DRAINASE Status Hitungan : MC-100


No. Propil. : P.Mg.23 Acuan Gambar Rencana : `
Item Kegiatan : Galian - Timbunan - Pemadatan No. Lembar Halaman : 25 of 56
REHABILITASI JARINGAN IRIGASI D.I PROGO MANGGIS Kontrak Nomor : 10/PKK/PJPA.SO/2017

SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC NUSANTARA

Kegiatan Irigasi dan Rawa II TA.2017-2019 Konsultan : PT. WAHANA KRIDA KONSOLINDO

HITUNGAN VOLUME GALIAN, TIMBUNAN DAN PEMADATAN Chart Title

CALCULATION

Galian Timbunan - Pemadatan OGL


Coordinate X Y Coordinate X Y Coordinate
Point XxB YxA Point XxB YxA Point
x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y x(n-1)-x(n+1) y(n-1)-y(n+1) x y
0 0
0 0 0
1 17.529 392.990 0.409 0.307 160.772 5.380 1 7.398 391.130
2 17.120 392.683 0.496 0.393 194.692 6.723 2 7.568 393.016
3 17.033 392.597 0.087 0.043 34.038 0.734 3 7.818 393.016
4 17.033 392.640 (0.350) (0.393) (137.424) (6.689) 4 7.879 392.913
5 17.383 392.990 (0.496) (0.350) (194.844) (6.084) 5 11.672 392.913
6 17.529 392.990 (0.146) - (57.298) - 6 11.981 392.750
7 12.266 392.466
8 12.466 392.466
1 12.133 392.640 - 0.042 - 0.507 9 13.280 391.652
2 12.133 392.598 0.152 (0.110) 59.675 (1.332) 10 13.623 391.598
3 11.981 392.750 0.461 (0.315) 181.136 (3.776) 11 14.646 391.580
4 11.672 392.913 1.048 (0.164) 411.773 (1.910) 12 15.542 391.603
5 10.933 392.913 0.739 (0.200) 290.206 (2.187) 13 15.866 391.632
6 10.933 393.113 (0.727) (0.200) (285.636) (2.187) 14 16.701 392.466
7 11.660 393.113 (1.200) 0.473 (471.657) 5.520 15 16.901 392.466
8 12.133 392.640 (0.473) 0.473 (185.876) 5.744 16 17.120 392.683
17 17.529 392.990
18 19.614 392.990
1 8.233 392.913 0.354 - 139.170 - 19 19.958 392.600
2 7.879 392.913 0.415 (0.103) 163.138 (0.809)
3 7.818 393.016 (0.036) (0.200) (14.266) (1.564)
4 7.915 393.113 (0.415) (0.097) (163.221) (0.770)
5 8.233 393.113 (0.318) 0.200 (124.971) 1.647
6 8.233 392.913 - 0.200 - 1.647

JUMLAH - - JUMLAH (0.593) 0.593


LUAS AREA GALIAN (M2) - LUAS AREA TIMBUNAN-PEMADATAN (M2) 0.30

SKETCH

P.Mg.23 ( Hm.11+66 )

Beton Ta npa Tul ang an


f'c = 14,5 Mpa Pasi r Batu
+ 393.18
+ 393.06
+ 392. 71
1 1
1 1

MA + 391.96

+ 391. 56

SKETCH

Chart Title
Galian Timbunan OGL

395

394

393

392

391
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
REHABILITASI JARINGAN IRIGASI D.I PROGO MANGGIS Kontrak Nomor : 10/PKK/PJPA.SO/2017
SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC NUSANTARA
Kegiatan Irigasi dan Rawa II TA.2017-2019 Konsultan : PT. WAHANA KRIDA KONSOLINDO

DENAH PEKERJAAN
Jenis Pekerjaan : Lining Beton Bertulang Status Hitungan : MC - 100
Lokasi : Saluran Drainase Induk Progomanggis (Hm.142+11) No. Lembar Halaman : 1 dari 1
Item Kegiatan :

DENAH DRAINASE

IV V

I II III

Beton f 'c 14,5 Mpa

Beton f 'c 14,5 Mpa

Beton B.0 (t =5cm)

Disetujui : Diperiksa Oleh : Disiapkan oleh :


Pengawas Lapangan

Mardono Yohan Novara Petrus Widyatama, S.T. Istianah, S.T.


Pengawas Lapangan - 1 Pengawas Lapangan - 2 Konsultan Supervisi Kontraktor
Quantity Surveyor
1.00
REHABILITASI JARINGAN IRIGASI D.I PROGO MANGGIS Kontrak Nomor : 10/PKK/PJPA.SO/2017
SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC NUSANTARA
Kegiatan Irigasi dan Rawa II TA.2017-2019 Konsultan : PT. WAHANA KRIDA KONSOLINDO

HITUNGAN VOLUME BETON MUTU f'c = 14,5 Mpa


Jenis Pekerjaan : Lining Beton Bertulang Status Hitungan : MC - 100
Lokasi : Saluran Drainase Induk Progomanggis (Hm.142+11) No. Lembar Halaman : 1 dari 2
Item Kegiatan : Beton mutu f'c = 14,5 Mpa

Quantity
Section Type Sketch / Gambar Hitungan Pot- Unit Accum.
Jml
(m3) (m3)

A. SALURAN DRAINASE INDUK PROGOMANGGIS (Hm.142+11)


L = 196.95 M I. Hitungan (L = 196.95 M )

Vol. = P X L X t
I I = 196.95 X 1.10 X 0.15 = 32.497 m3
II = 196.95 X 0.80 X 0.20 = 31.512 m3
III = 196.95 X 0.80 X 0.20 = 31.512 m3
II
IV = 196.95 X 1.10 X 0.20 = 43.329 m3
Vol. ( I + II + III + IV ) = 138.850 m3 138.85 1 138.85
III

B. BOX DRAINASE
L = 5.00 BH I. Hitungan
DETIL - I
Vol. = P X L X t
a = 1.00 X 0.10 X 0.10 = 0.010 m3
I b = 1.00 X 0.20 X 2.10 = 0.420 m3
II III II Vol-I ( a + b ) = 0.430 m3
I

DETIL - II
Vol. = P X L X t
c = 1.40 X 0.10 X 0.10 = 0.014 m3
d = 1.40 X 0.20 X 0.50 = 0.140 m3
e = 0.35 X 0.20 X 0.80 = 0.056 m3
= 0.35 X 0.20 X 0.80 = 0.056 m3
a c f = 1.40 X 0.20 X 0.80 = 0.224 m3
d

Vol-II ( c + d + 2e + f ) = 0.490 m3
b e
g

DETIL - I DETIL - II DETIL - III

`
a c
d

b e
g

DETIL - I DETIL - II DETIL - III

Sub Total A 138.85


b e
g

DETIL - I DETIL - II DETIL - III

HITUNGAN VOLUME BETON MUTU f'c = 14,5 Mpa


Jenis Pekerjaan : Lining Beton Bertulang Status Hitungan : MC - 100
Lokasi : Saluran Drainase Induk Progomanggis (Hm.142+11) No. Lembar Halaman : 2 dari 2
Item Kegiatan : Beton mutu f'c = 14,5 Mpa

Quantity
Section Type Sketch / Gambar Hitungan Pot- Unit Accum.
Jml
(m3) (m3)

DETIL - III
Vol. = P X L X t
a = 1.00 X 0.10 X 0.10 = 0.010 m3
Vol-III ( g ) = 0.010 m3

VOLUME BOX DRAINASE


Vol. = Vol-I + Vol-II + Vol-III
= 0.43 + 0.49 + 0.01 = 0.930 m3 0.93 5 4.65

C. JALAN BETON
L = 190.00 M

I. Hitungan
Vol. = P X L X t
= 190.00 X 2.25 X 0.10 = 42.750 m3
Vol = 42.750 m3 42.75 1 42.75

Beton Tanpa Tulangan


f 'c 14,5 Mpa

Sub Total B 47.40


TOTAL ( Sub Total A + Sub Total B ) 186.25
Disetujui : Dicheck oleh : Disiapkan oleh :
Pengawas Lapangan
Mardono Yohan Novara Petrus Widyatama, S.T. Istianah, ST
Pengawas Lap-1 Pengawas Lap-2 Konsultan Kontraktor
1.00 1.00 1.00
REHABILITASI JARINGAN IRIGASI D.I PROGO MANGGIS Kontrak Nomor : 10/PKK/PJPA.SO/2017
SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC NUSANTARA
Kegiatan Irigasi dan Rawa II TA.2017-2019 Konsultan : PT. WAHANA KRIDA KONSOLINDO

HITUNGAN VOLUME BEKISTING


Jenis Pekerjaan : Lining Beton Bertulang Status Hitungan : MC - 100
Lokasi : Saluran Drainase Induk Progomanggis (Hm.142+11) No. Lembar Halaman : 1 dari 1
Item Kegiatan : Bekisting dinding beton biasa dgn multiplex 12 mm atau 18 mm (TP) (dipakai 3 x)

Quantity
Section Type Sketch / Gambar Hitungan Pot- Unit Accum.
Jml
(m2) (m2)

A. SALURAN DRAINASE INDUK PROGOMANGGIS (Hm.142+11)


L = 196.95 M

I. Hitungan Bekisting (L = 196.95 M )

Vol. = P X L X n
a = 196.95 X 1.15 X 2.00 = 452.985 m2
c b = 196.95 X 0.80 X 2.00 = 315.120 m2
a b b a
c = 196.95 X 0.70 X 1.00 = 137.865 m2
Vol. ( a + b + c ) = 905.970 m2 905.97 1 905.97

B. BOX DRAINASE
L = 5.00 BH I. Hitungan

Vol. = P X L X n
a = 1.70 X 2.20 X 2.00 = 7.480 m2
b = 1.30 X 1.90 X 2.00 = 4.940 m2
c = 0.70 X 1.10 X 2.00 = 1.540 m2
a c d
b e d = 0.70 X 1.10 X 2.00 = 1.540 m2
a b
ced dec
e = 0.70 X 0.20 X 2.00 = 0.280 m2
b
c d
a Vol. ( a + b + c + d + e ) = 15.780 m2 15.78 5 78.90

DETIL - I DETIL - II

Sub Total A 984.87


TOTAL ( Sub Total A ) 984.87
Disetujui : Dicheck oleh : Disiapkan oleh :
Pengawas Lapangan
Mardono Yohan Novara Petrus Widyatama, S.T. Istianah, ST
Pengawas Lap-1 Pengawas Lap-2 Konsultan Kontraktor
1.00 1.00 1.00
REHABILITASI JARINGAN IRIGASI D.I PROGO MANGGIS Kontrak Nomor : 10/PKK/PJPA.SO/2017
SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC NUSANTARA
Kegiatan Irigasi dan Rawa II TA.2017-2019 Konsultan : PT. WAHANA KRIDA KONSOLINDO

HITUNGAN VOLUME LANTAI KERJA f'c = 7,4 Mpa


Jenis Pekerjaan : Lining Beton Bertulang Status Hitungan : MC - 100
Lokasi : Saluran Drainase Induk Progomanggis (Hm.142+11) No. Lembar Halaman : 1 dari 1
Item Kegiatan : Lantai Kerja Beton f'c 7,4 Mpa

Quantity
Section Type Sketch / Gambar Hitungan Pot- Unit Accum.
Jml
(m3) (m3)

A. SALURAN DRAINASE INDUK PROGOMANGGIS (Hm.142+11)


L = 196.95 M

I. Hitungan (L = 196.95 M )

Vol. = P X L X t
a = 196.95 X 1.20 X 0.05 = 11.817 m3
Vol. ( a ) = 11.817 m3 11.82 1 11.82

B. BOX DRAINASE
L = 5.00 BH

I. Hitungan
Vol. = P X L X t
a = 1.40 X 1.50 X 0.05 = 0.105 m3
Vol. ( a ) = 0.105 m3 0.11 5 0.53

POTONGAN

Sub Total A 12.34


TOTAL ( Sub Total A ) 12.34
Disetujui : Dicheck oleh : Disiapkan oleh :
Pengawas Lapangan
Mardono Yohan Novara Petrus Widyatama, S.T. Istianah, ST
Pengawas Lap-1 Pengawas Lap-2 Konsultan Kontraktor
1.00 1.00 1.00
REHABILITASI JARINGAN IRIGASI D.I PROGO MANGGIS Kontrak Nomor : 10/PKK/PJPA.SO/2017

SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC NUSANTARA


Kegiatan Irigasi dan Rawa II TA.2017-2019 Konsultan : PT. WAHANA KRIDA KONSOLINDO

HITUNGAN VOLUME PEMBESIAN


Jenis Pekerjaan : Lining Beton Bertulang Status Hitungan : MC - 100
Lokasi : Saluran Drainase Induk Progomanggis (Hm.142+11) No. Lembar Halaman : 1 dari 4
Item Kegiatan : Pembesian 100 kg dengan besi polos atau ulir untuk pembesian plat

Length Lap Total Unit


Bar Size Unit Total
per unit Length Length Weight
Sketch / Drawing Mark
(mm) (nos) (m) (m) (m) (kg/m) (kg)
1 2 3=n 4 = a + b + c +... 5 6 = 3x4 7 8 = 6x7

SALURAN DRAINASE INDUK PROGOMANGGIS (Hm.142+11)


L = 196.95 M Hitungan Besi Per 1 Frame = 12 m'

E3

D1 D2

E2

C2 C1

E1

B2 B1

A2 A1

- Jumlah Besi Tulangan Pokok (nos)


= ( (Panjang / Jarak Bagi (0.20)) +1 )
= ( (12.00/0.20) +1 ) = 61.0 bh
Dibulatkan = 61.0 bh
- Panjang Tulangan Pokok Per Unit (m) = ( a + b + c ) = 3.35 m

- Jumlah Besi Tulangan Bagi (nos)


= ( (Panjang / Jarak Bagi (0.20)) +1 )
= ( (1.15/0.20) +1 ) = 12.0 bh (Dinding Kanan dan Kiri )
= ( (1.05/0.20) +1 ) = 6.0 bh ( Lantai )
= 18.0 bh
- Panjang Tulangan Bagi Per Unit (m) = ( a ) = 12.00 m

1. Besi Tulangan Pokok


a = 1.15 m A1 10 61 3.35 - 204.35 0.617 126.08
b = 1.05 m
c a
c = 1.15 m
b
n = 61.00 bh

2. Besi Tulangan Bagi


a = 12.00 m A2 8 18 12.00 - 216.00 0.395 85.32
a

n = 18.00 bh
Total Besi A. 211.40
HITUNGAN VOLUME PEMBESIAN
Jenis Pekerjaan : Lining Beton Bertulang Status Hitungan : MC - 100
Lokasi : Saluran Drainase Induk Progomanggis (Hm.142+11) No. Lembar Halaman : 2 dari 4
Item Kegiatan : Pembesian 100 kg dengan besi polos atau ulir untuk pembesian plat

Length Lap Total Unit


Bar Size Unit Total
per unit Length Length Weight
Sketch / Drawing Mark
(mm) (nos) (m) (m) (m) (kg/m) (kg)
1 2 3=n 4 = a + b + c +... 5 6 = 3x4 7 8 = 6x7

- Jumlah Besi Tulangan Pokok (nos)


= ( (Panjang / Jarak Bagi (0.20)) +1 )
= ( (12.00/0.20) +1 ) = 61.0 bh
Dibulatkan = 61.0 bh
- Panjang Tulangan Pokok Per Unit (m) = ( a ) = 1.05 m

- Jumlah Besi Tulangan Bagi (nos)


= ( (Panjang / Jarak Bagi (0.20)) +1 )
= ( (0.65/0.20) +1 ) = 4.0 bh
= 4.0 bh
- Panjang Tulangan Bagi Per Unit (m) = ( a ) = 12.00 m

3. Besi Tulangan Pokok


a = 1.05 m B1 10 61 1.05 - 64.05 0.617 39.52
n = 61.00 bh
ab

4. Besi Tulangan Bagi


a = 12.00 m B2 8 4 12.00 - 48.00 0.395 18.96
a

n = 4.00 bh

Total Besi B. 58.48

- Jumlah Besi Tulangan Pokok (nos)


= ( (Panjang / Jarak Bagi (0.20)) +1 )
= ( (12.00/0.20) +1 ) = 61.0 bh
Dibulatkan = 61.0 bh
- Panjang Tulangan Pokok Per Unit (m) = ( a + b ) = 1.90 m

- Jumlah Besi Tulangan Bagi (nos)


= ( (Panjang / Jarak Bagi (0.20)) +1 )
= ( (0.75/0.20) +1 ) = 4.8 bh
Dibulatkan = 4.0 bh
- Panjang Tulangan Bagi Per Unit (m) = ( a + b ) = 1.90 m

5. Besi Tulangan Pokok


a = 0.95 m C1 10 61 1.90 - 115.90 0.617 71.51
b = 0.95 m
a b n = 61.00 bh

6. Besi Tulangan Bagi


a = 12.00 m C2 8 8 8.00 - 64.00 0.395 25.28
a

n = 8.00 bh
(ka;ki)
Total Besi C. 96.79

HITUNGAN VOLUME PEMBESIAN


Jenis Pekerjaan : Lining Beton Bertulang Status Hitungan : MC - 100
Lokasi : Saluran Drainase Induk Progomanggis (Hm.142+11) No. Lembar Halaman : 3 dari 4
Item Kegiatan : Pembesian 100 kg dengan besi polos atau ulir untuk pembesian plat

Length Lap Total Unit


Bar Size Unit Total
per unit Length Length Weight
Sketch / Drawing Mark
(mm) (nos) (m) (m) (m) (kg/m) (kg)
1 2 3=n 4 = a + b + c +... 5 6 = 3x4 7 8 = 6x7

- Jumlah Besi Tulangan Pokok (nos)


= ( (Panjang / Jarak Bagi (0.20)) +1 )
= ( (0.85/0.20) +1 ) = 5.3 bh
Dibulatkan = 5.0 bh
- Panjang Tulangan Pokok Per Unit (m) = ( a ) = 12.00 m

- Jumlah Besi Tulangan Bagi (nos)


= ( (Panjang / Jarak Bagi (0.20)) +1 )
= ( (12.00/0.20) +1 ) = 61.0 bh
= 61.0 bh
- Panjang Tulangan Bagi Per Unit (m) = ( a ) = 0.85 m

7. Besi Tulangan Pokok


a = 12.00 m D1 10 10 12.00 - 120.00 0.617 74.04
a

n = 10.00 bh
(ka;ki)

8. Besi Tulangan Bagi


a = 0.85 m D2 8 122 0.85 - 103.70 0.395 40.96
a

n = 122.00 bh
(ka;ki)

Total Besi D. 115.00

- Jumlah Besi Supprot E.1 (nos)


= ( (Panjang / Jarak Bagi (1.00)) +1 )
= ( (12.00/1.00) +1 ) = 13.0 bh
Dibulatkan = 13.0 bh
- Panjang Tulangan Pokok Per Unit (m) = ( 2a + 2b + c ) = 0.45 m

- Jumlah Besi Supprot E.2 (nos)


= ( (Panjang / Jarak Bagi (1.00)) +1 )
= ( (12.00/1.00) +1 ) = 13.0 bh
Dibulatkan = 13.0 bh
- Panjang Tulangan Bagi Per Unit (m) = ( a + b + c ) = 0.45 m
9. Besi Support Lantai
a = 0.15 m E1 10 13 0.75 - 9.75 0.617 6.02
c
a b b a b = 0.15 m
c = 0.15 m
n = 13.00 bh

10. Besi Support Dinding


a = 0.15 m E2 10 26 0.45 - 11.70 0.617 7.22
c
b a
b = 0.15 m
c
b a

c = 0.15 m
n = 26.00 bh
(ka;ki)

Total Besi E. 13.24


HITUNGAN VOLUME PEMBESIAN
Jenis Pekerjaan : Lining Beton Bertulang Status Hitungan : -
Lokasi : Saluran Drainase Induk Progomanggis (Hm.142+11) No. Lembar Halaman : 4 dari 4
Item Kegiatan : Pembesian 100 kg dengan besi polos atau ulir untuk pembesian plat

Length Lap Total Unit


Bar Size Unit Total
per unit Length Length Weight
Sketch / Drawing Mark
(mm) (nos) (m) (m) (m) (kg/m) (kg)
1 2 3=n 4 = a + b + c +... 5 6 = 3x4 7 8 = 6x7

- Jumlah Besi Supprot E.3 (nos)


= ( (Panjang / Jarak Bagi (1.00)) +1 )
= ( (12.00/1.00) +1 ) = 13.0 bh
Dibulatkan = 13.0 bh
- Panjang Tulangan Pokok Per Unit (m) = ( 2a + 2b + c ) = 0.45 m

11. Besi Support Plat tutup


a = 0.15 m E3 10 13 0.65 - 8.45 0.617 5.21
c
a bb a b = 0.10 m
c = 0.15 m
n = 13.00 bh

Total Besi F. 5.21

Total pembesian 1 Frame (Sub Total A. + B. + C. + D + E + F) 500.12

Total Frame ( 196.95 / 12.00 ) = 16.41 Frame )

Total Pembesian ( A. ) ( 500.12 x 16.41 ) 8,206.96


Disetujui : Dicheck oleh : Disiapkan oleh :
Mardono Yohan Novara Petrus Widyatama, S.T. Istianah, S.T.
Pengawas Lap-1 Pengawas Lap-2 Konsultan Kontraktor
Quantity Surveyor
REHABILITASI JARINGAN IRIGASI D.I PROGO MANGGIS Kontrak Nomor : 10/PKK/PJPA.SO/2017

SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC NUSANTARA


Kegiatan Irigasi dan Rawa II TA.2017-2019 Konsultan : PT. WAHANA KRIDA KONSOLINDO

HITUNGAN VOLUME PEMBESIAN


Jenis Pekerjaan : Pekerjaan Beton Status Hitungan : MC - 100
Lokasi : Saluran Sekunder Sumberejo No. Lembar Halaman : 1 dari 6
Item Kegiatan : Pembesian 100 kg dengan besi polos atau ulir untuk pembesian plat

Length Lap Total Unit


Bar Size Unit Total
per unit Length Length Weight
Sketch / Drawing Mark
(mm) (nos) (m) (m) (m) (kg/m) (kg)
1 2 3=n 4 = a + b + c +... 5 6 = 3x4 7 8 = 6x7

SALURAN DRAINASE INDUK PROGOMANGGIS (Hm.142+11)


L = 196.95 M

C. BALOK MELINTANG DINDING SALURAN

C
L
A2 A2

A1 A1

E2 E2

E1 E1

E3 E3

B2 B2
F2 F1

F3
B1 B1

c a a
b

- Jumlah Beugel Balok Melintang (nos)


= ( (Panjang Balok Melintang / Jarak Beugel (0.15)) +1 )
= ( (4.48/0.15) +1 ) = 30.0 bh

= 30.0 bh

c
b

a a A1
- Panjang Beugel Per Unit (m) = ( 2a + 2b + 2c ) = 0.8 m
b

c
a b

A2

- Jumlah Besi Tulangan Pokok Balok Melintang D = 10mm (nos) = 2 bh


- Panjang Besi Tulangan Pokok D=10mm Per Unit E2 = (a + b + c) = 4.68 m

- Jumlah Besi Tulangan Pokok Balok Melintang D = 10mm (nos) = 2 bh


- Panjang Besi Tulangan Pokok D=10mm Per Unit E3 = (a + b + c) = 4.48 m

SUB TOTAL A. ( Total Besi Balok Memanjang Atas ) -


Total Frame ( Err:509 / 27.10 ) = Err:509 Frame )

Sub Total A. ( Total Pembesian Balok Atas ) ( 0.00 x Err:509 ) Err:509


HITUNGAN VOLUME PEMBESIAN
Jenis Pekerjaan : Pekerjaan Beton Status Hitungan : MC - 100
Lokasi : Saluran Sekunder Sumberejo No. Lembar Halaman : 2 dari 6
Item Kegiatan : Pembesian 100 kg dengan besi polos atau ulir untuk pembesian plat

Length Lap Total Unit


Bar Size Unit Total
per unit Length Length Weight
Sketch / Drawing Mark
(mm) (nos) (m) (m) (m) (kg/m) (kg)
1 2 3=n 4 = a + b + c +... 5 6 = 3x4 7 8 = 6x7

B. BALOK MEMANJANG DASAR Hitungan Besi Per 1 Frame = 25.50 m'


L = Err:509 M

- Jumlah Beugel Balok Memanjang Dasar (nos)


= ( (Panjang Balok Frame / Jarak Beugel (0.15)) +1 )
= ( (27.10/0.15) +1 ) = 181.7 bh
Dibulatkan = 181.0 bh
- Panjang Beugel Per Unit (m) = ( 2a + 2b + 2c ) = 0.9 m

B2
- Jumlah Besi Memanjang Balok Dasar D = 10mm (nos) = 4 bh
- Panjang Besi Memanjang D=10mm Per Unit = (a + b + c) = 27.90 m

B1

3. Beugel Balok Memanjang Dasar Saluran


a = 0.15 m B1 8 362 0.90 - 325.80 0.395 128.69
b b = 0.25 m
c a a
b
c = 0.05 m
n = 362.00 bh
(ka;ki)

3. Besi Memanjang Balok Dasar Saluran


a = 12.00 m B2 10 8 27.90 - 223.20 0.617 137.71
b

b = 12.00 m
c a a A1
b

c
a b

A2

c = 3.90 m
n = 8.00 bh
(ka;ki)

Total Besi Balok Memanjang Dasar 1 Frame 266.40

Total Frame ( Err:509 / 27.10 ) = Err:509 Frame )

Sub Total B. ( Total Pembesian Balok Dasar ) ( 266.40 x Err:509 ) Err:509


HITUNGAN VOLUME PEMBESIAN
Nama Bangunan : Pekerjaan Beton Status Hitungan : MC - 100
Lokasi : Saluran Sekunder Sumberejo No. Lembar Halaman : 3 dari 6
Item Kegiatan : Pembesian 100 kg dengan besi polos atau ulir untuk pembesian plat

Length Lap Total Unit


Bar Size Unit Total
per unit Length Length Weight
Sketch / Drawing Mark
(mm) (nos) (m) (m) (m) (kg/m) (kg)
1 2 3=n 4 = a + b + c +... 5 6 = 3x4 7 8 = 6x7

C. BALOK MELINTANG DINDING SALURAN

C
L
A2 A2

A1 A1

E2 E2

E1 E1

E3 E3

B2 B2
F2 F1

F3
B1 B1

- Jumlah Beugel Balok Melintang (nos)


= ( (Panjang Balok Melintang / Jarak Beugel (0.15)) +1 )
= ( (4.48/0.15) +1 ) = 30.0 bh

= 30.0 bh
- Panjang Beugel Per Unit (m) = ( 2a + 2b + 2c ) = 0.8 m

- Jumlah Besi Tulangan Pokok Balok Melintang D = 10mm (nos) = 2 bh


- Panjang Besi Tulangan Pokok D=10mm Per Unit E2 = (a + b + c) = 4.68 m

- Jumlah Besi Tulangan Pokok Balok Melintang D = 10mm (nos) = 2 bh


- Panjang Besi Tulangan Pokok D=10mm Per Unit E3 = (a + b + c) = 4.48 m

5. Beugel Balok Melintang Saluran


a = 0.10 m E1 8 30 0.80 - 24.00 0.395 9.48
b
b = 0.25 m
c a
b
a
c = 0.05 m
n = 30.00 bh

6. Besi Tulangan Pokok Balok Melintang


a = 1.40 m E2 10 2 4.68 - 9.36 0.617 5.78
b = 3.18
c
b
m
c = 0.10 a m
n = 2.00 bh

7. Besi Tulangan Pokok Balok Melintang


a = 1.40 m E3 10 2 4.48 - 8.96 0.617 5.53
b = 2.98
c
b
m
c = 0.10 a m
n = 2.00 bh

Total Besi Balok Melintang 1 Bh 20.79


Jumlah Balok Melintang = 0 bh )

Sub Total C. ( Total Pembesian Balok Melintang Dinding ) ( 20.79 x 0.00 ) -


HITUNGAN VOLUME PEMBESIAN
Nama Bangunan : Pekerjaan Beton Status Hitungan : MC - 100
Lokasi : Saluran Sekunder Sumberejo No. Lembar Halaman : 4 dari 6
Item Kegiatan : Pembesian 100 kg dengan besi polos atau ulir untuk pembesian plat

Length Lap Total Unit


Bar Size Unit Total
per unit Length Length Weight
Sketch / Drawing Mark
(mm) (nos) (m) (m) (m) (kg/m) (kg)
1 2 3=n 4 = a + b + c +... 5 6 = 3x4 7 8 = 6x7

D. BALOK MELINTANG LANTAI

CL
A2 A2

A1 A1

E2 E2

E1 E1

E3 E3

B2 B2
F2 F1

F3
B1 B1

- Jumlah Beugel Balok Melintang (nos)


= ( (Panjang Balok Melintang / Jarak Beugel (0.15)) +1 )
= ( (7.00/0.15) +1 ) = 47.0 bh

= 47.0 bh
- Panjang Beugel Per Unit (m) = ( 2a + 2b + 2c ) = 0.8 m

- Jumlah Besi Tulangan Pokok Balok Melintang D = 10mm (nos) = 2 bh


- Panjang Besi Tulangan Pokok D=10mm Per Unit E2 = (a) = 7.20 m

- Jumlah Besi Tulangan Pokok Balok Melintang D = 10mm (nos) = 2 bh


- Panjang Besi Tulangan Pokok D=10mm Per Unit E3 = (a) = 7.20 m

8. Beugel Balok Melintang Saluran


a = 0.10 m F1 8 47 0.80 - 37.60 0.395 14.85
b
b = 0.25 m
c a
b
a
c = 0.05 m
n = 47.00 bh

9. Besi Tulangan Pokok Balok Melintang


a = 7.20 m
a
F2 10 2 7.20 - 14.40 0.617 8.88
n = 2.00 bh

10. Besi Tulangan Pokok Balok Melintang


a = 7.20 m
a
F3 10 2 7.20 - 14.40 0.617 8.88
n = 2.00 bh

Total Besi Balok Melintang 1 Bh 32.61


Jumlah Balok Melintang = 0 bh )

Sub Total D. ( Total Pembesian Balok Melintang Lantai ) ( 32.61 x 0.00 ) -


HITUNGAN VOLUME PEMBESIAN
Nama Bangunan : Pekerjaan Beton Status Hitungan : MC - 100
Lokasi : Saluran Sekunder Sumberejo No. Lembar Halaman : 5 dari 6
Item Kegiatan : Pembesian 100 kg dengan besi polos atau ulir untuk pembesian plat

Length Lap Total Unit


Bar Size Unit Total
per unit Length Length Weight
Sketch / Drawing Mark
(mm) (nos) (m) (m) (m) (kg/m) (kg)
1 2 3=n 4 = a + b + c +... 5 6 = 3x4 7 8 = 6x7

E. LINING COR INSITU DINDING


L = 196.95 M

C
L
A2 A2

A1 A1
C2 C2

C1 C1

B2 D1 D2 B2

B1 B1

- Jumlah Tulangan Melintang Lining Cor In Situ (nos)


= ( ((Panjang Cor In Situ / Jarak Sengkang (0.10)) +1 ) x 4 (Segmen) )
= (((6.40/0.10) +1 ) x 4 = 260.0 bh
- Panjang Tulangan Melintang Per Unit (m) = ( a + b + c ) = 4.68 m

- Jumlah Tulangan Memanjang Lining Cor In Situ (nos)


= ( ((Panjang Cor In Situ / Jarak Sengkang (0.10)) +1 )
= (((4.48/0.10) +1 ) = 45.0 bh
- Panjang Tulangan Memanjang Per Unit (m) = 27.44 m

11. Besi Tulangan Melintang Lining Cor In Situ


a = 0.10 m C1 8 520 4.68 - 2,433.60 0.395 961.27
c b = 3.18 m
b

a
c = 1.40 m
n = 520.00 bh
(ka;ki)

12. Besi Tulangan Melintang Lining Cor In Situ


a = 12.00 m C2 8 90 27.44 - 2,469.60 0.395 975.49
b

b = 12.00 m
c a a A1
b

c
a b

A2

c = 3.44 m
n = 90.00 bh
(ka;ki)

Total Besi Lining Cor In Situ Dinding 1 Frame 1,936.76


Total Frame ( 196.95 / 27.10 ) = 7.26 Frame )

Sub Total E. ( Total Pembesian Insitu Dinding ) ( 1936.76 x 7.26 ) 14,060.87


HITUNGAN VOLUME PEMBESIAN
Nama Bangunan : Pekerjaan Beton Status Hitungan : MC - 100
Lokasi : Saluran Sekunder Sumberejo No. Lembar Halaman : 6 dari 6
Item Kegiatan : ###

Length Lap Total Unit


Bar Size Unit Total
per unit Length Length Weight
Sketch / Drawing Mark
(mm) (nos) (m) (m) (m) (kg/m) (kg)
1 2 3=n 4 = a + b + c +... 5 6 = 3x4 7 8 = 6x7

E. LINING COR INSITU LANTAI


L = Err:509 M

CL
A2 A2

A1 A1
C2 C2

C1 C1

B2 D1 D2 B2

B1 B1

- Jumlah Tulangan Melintang Lining Cor In Situ (nos)


= ( ((Panjang Cor In Situ / Jarak Sengkang (0.10)) +1 ) x 4 (Segmen) )
= (((6.40/0.10) +1 ) x 4 = 260.0 bh
- Panjang Tulangan Melintang Per Unit (m) = ( a ) = 7.20 m

- Jumlah Tulangan Memanjang Lining Cor In Situ (nos)


= ( ((Panjang Cor In Situ / Jarak Sengkang (0.10)) +1 )
= (((7.00/0.10) +1 ) = 71.0 bh
- Panjang Tulangan Memanjang Per Unit (m) = 27.44 m

13. Besi Tulangan Melintang Lining Cor In Situ


a = 7.20 m D1 8 260 7.20 - 1,872.00 0.395 739.44
n = 260.00 bh
a

14. Besi Tulangan Melintang Lining Cor In Situ


a = 12.00 m D2 8 71 27.44 - 1,948.24 0.395 769.55
b

b = 12.00 m
a a A1
c
b

c
a b
A2

c = 3.44 m
n = 71.00 bh

Total Besi Lining Cor In Situ Dinding 1 Frame 1,508.99

Total Frame ( 196.95 / 27.10 ) = 7.26 Frame )

Sub Total F. ( Total Pembesian Insitu Lantai ) ( 1508.99 x 7.26 ) 10,955.26

TOTAL PEMBESIAN (Sub Total A + Sub Total B + Sub Total C + Sub Total D + Sub Total E + Sub Total F) Err:509
Disetujui : Dicheck oleh : Disiapkan oleh :
Mardono Yohan Novara Petrus Widyatama, S.T. Istianah, S.T.
Pengawas Lap-1 Pengawas Lap-2 Konsultan Kontraktor
Quantity
REHABILITASI JARINGAN IRIGASI D.I PROGO MANGGIS Kontrak Nomor : 10/PKK/PJPA.SO/2017
SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC NUSANTARA
Kegiatan Irigasi dan Rawa II TA.2017-2019 Konsultan : PT. WAHANA KRIDA KONSOLINDO

HITUNGAN VOLUME BEKISTING


Jenis Pekerjaan : Pekerjaan Beton Status Hitungan : MC - 100
Lokasi : Bendung Badran No. Lembar Halaman : 1 dari 2
Item Kegiatan : Bekisting balok beton biasa dgn kayu papan (TP) (dipakai 4 x)

Quantity
Section Type Sketch / Gambar Hitungan Pot- Unit Accum.
Jml
(m2) (m2)

A. SALURAN DRAINASE INDUK PROGOMANGGIS (Hm.142+11)


L = 196.95 M I. Hitungan Balok Atas (L = 196.95 M )

Vol. = P X a X n
= 196.95 X 0.20 X 2.00 = 78.780 m2
Vol. ( a ) = 78.780 m2 78.78 2 157.56
(ka;ki)

CL

II

II. Hitungan Balok Bawah (L = Err:509 M)

Vol. = P X b X n
= Err:509 X 0.30 X 2.00 = Err:509 m2
Vol. ( a ) = Err:509 m2 Err:509 2 Err:509
(ka;ki)

a a b b
Sub Total A Err:509
HITUNGAN VOLUME BEKISTING
Jenis Pekerjaan : Pekerjaan Beton Status Hitungan : MC - 100
Lokasi : Bendung Badran No. Lembar Halaman : 2 dari 2
Item Kegiatan : Bekisting balok beton biasa dgn kayu papan (TP) (dipakai 4 x)

Quantity
Section Type Sketch / Gambar Hitungan Pot- Unit Accum.
Jml
(m2) (m2)

III. Hitungan Balok Melintang Dinding (Ka;Ki)


- Jumlah Balok Melintang Dinding Saluran N = - bh
- Jumlah Balok Melintang Dinding (Double Balok) n2 = 12.00 bh
- Jumlah Balok Melintang Dinding (Single Balok) n1 = N - (n2 x 2)
n1 = (24.00) bh

Vol. = P X c X n
n1 = 2.97 X 0.15 X 2.00 = 0.891 m2
= 0.891 m2 0.89 -24 (21.38)
(n1)
Vol. = P X c X n
n2 = 2.97 X 0.15 X 2.00 = 0.891 m2
= 0.891 m2 0.89 12 10.69
POTONGAN A-A

POTONGAN A-A

POTONGAN A-A

POTONGAN A-A
(n2)
IV. Hitungan Balok Melintang Lantai
A A
- Jumlah Balok Melintang Dinding Saluran N = - bh
A
A
- Jumlah Balok Melintang Dinding (Double Balok) n2 = 6.00 bh
- Jumlah Balok Melintang Dinding (Single Balok) n1 = N - (n2 x 2)
n1 = (12.00) bh

Vol. = P X c X n
n1 = 7.00 X 0.15 X 2.00 = 2.100 m2
= 2.100 m2 2.10 -12 (25.20)
(n1)
P OTONGAN A-A

POTONGA N A-A
Vol. = P X c X n
A
n2 = 7.00 X 0.15 X 2.00 = 2.100 m2
A = 2.100 m2 2.10 6 12.60
(n2)
Sub Total B (23.29)
TOTAL ( Sub Total A + Sub Total B ) Err:509
Disetujui : Dicheck oleh : Disiapkan oleh :
Pengawas Lapangan
Mardono Yohan Novara Petrus Widyatama, S.T. Istianah, ST
Pengawas Lap-1 Pengawas Lap-2 Konsultan Kontraktor
1.00 1.00 1.00
REHABILITASI JARINGAN IRIGASI D.I PROGO MANGGIS Kontrak Nomor : 10/PKK/PJPA.SO/2017

SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC NUSANTARA


Kegiatan Irigasi dan Rawa II TA.2017-2019 Konsultan : PT. WAHANA KRIDA KONSOLINDO

HITUNGAN VOLUME PEMBESIAN


Jenis Pekerjaan : Lining Beton Bertulang Status Hitungan : MC - 100
Lokasi : Saluran Drainase Induk Progomanggis (Hm.142+11) No. Lembar Halaman : 1 dari 3
Item Kegiatan : Pembesian 100 kg dengan besi polos atau ulir untuk pembesian plat

Length Lap Total Unit


Bar Size Unit Total
per unit Length Length Weight
Sketch / Drawing Mark
(mm) (nos) (m) (m) (m) (kg/m) (kg)
1 2 3=n 4 = a + b + c +... 5 6 = 3x4 7 8 = 6x7

BOX DRAINASE
L = 5.00 bh Hitungan Besi Per 1 bh

I2

H2 H1

I2
Lantai Ters ier

G2

G1 I1
Lantai Box Control

F2 F1

- Jumlah Besi Tulangan Pokok (nos)


= ( (Panjang / Jarak Bagi (0.20)) +1 )
= ( (1.35/0.20) +1 ) = 7.8 bh
Dibulatkan = 7.0 bh
- Panjang Tulangan Pokok Per Unit (m) = ( a + b + c ) = 5.65 m

- Jumlah Besi Tulangan Bagi (nos)


= ( (Panjang / Jarak Bagi (0.20)) +1 )
= ( (2.15/0.20) +1 ) = 22.0 bh (Dinding Kanan dan Kiri )
= ( (1.35/0.20) +1 ) = 7.0 bh ( Lantai )
= 29.0 bh
- Panjang Tulangan Bagi Per Unit (m) = ( a ) = 12.00 m

1. Besi Tulangan Pokok


a = 2.15 m F1 10 7 5.65 - 39.55 0.617 24.40
b = 1.35 m
c a
c = 2.15 m
b
n = 7.00 bh

2. Besi Tulangan Bagi


a = 1.35 m F2 8 29 1.35 - 39.15 0.395 15.46
a

n = 29.00 bh
Total Besi A. 39.86
HITUNGAN VOLUME PEMBESIAN
Jenis Pekerjaan : Lining Beton Bertulang Status Hitungan : MC - 100
Lokasi : Saluran Drainase Induk Progomanggis (Hm.142+11) No. Lembar Halaman : 2 dari 3
Item Kegiatan : Pembesian 100 kg dengan besi polos atau ulir untuk pembesian plat

Length Lap Total Unit


Bar Size Unit Total
per unit Length Length Weight
Sketch / Drawing Mark
(mm) (nos) (m) (m) (m) (kg/m) (kg)
1 2 3=n 4 = a + b + c +... 5 6 = 3x4 7 8 = 6x7

- Jumlah Besi Tulangan Pokok (nos)


= ( (Panjang / Jarak Bagi (0.20)) +1 )
= ( (1.35/0.20) +1 ) = 7.8 bh
Dibulatkan = 7.0 bh
- Panjang Tulangan Pokok Per Unit (m) = ( a ) = 1.35 m

- Jumlah Besi Tulangan Bagi (nos)


= ( (Panjang / Jarak Bagi (0.20)) +1 )
= ( (1.00/0.20) +1 ) = 6.0 bh
= 6.0 bh
- Panjang Tulangan Bagi Per Unit (m) = ( a ) = 1.35 m

3. Besi Tulangan Pokok

a
a = 1.35 m G1 10 7 1.35 - 9.45 0.617 5.83
n = 7.00 bh

4. Besi Tulangan Bagi


a = 1.35 m G2 8 6 1.35 - 8.10 0.395 3.20
a

n = 6.00 bh

Total Besi B. 9.03

- Jumlah Besi Tulangan Pokok (nos)


= ( (Panjang / Jarak Bagi (0.20)) +1 )
= ( (1.35/0.20) +1 ) = 7.8 bh
Dibulatkan = 7.0 bh
- Panjang Tulangan Pokok Per Unit (m) = ( a + b ) = 4.00 m

- Jumlah Besi Tulangan Bagi (nos)


= ( (Panjang / Jarak Bagi (0.20)) +1 )
= ( (1.85/0.20) +1 ) = 10.3 bh
Dibulatkan = 10.0 bh
- Panjang Tulangan Bagi Per Unit (m) = ( a + b ) = 1.90 m

5. Besi Tulangan Pokok


a = 2.05 m H1 10 7 4.10 - 28.70 0.617 17.71
b = 2.05 m
a b n = 7.00 bh

6. Besi Tulangan Bagi


a = 1.35 m H2 8 20 1.35 - 27.00 0.395 10.67
a

n = 20.00 bh
(ka;ki)
Total Besi C. 28.38

HITUNGAN VOLUME PEMBESIAN


Jenis Pekerjaan : Lining Beton Bertulang Status Hitungan : MC - 100
Lokasi : Saluran Drainase Induk Progomanggis (Hm.142+11) No. Lembar Halaman : 3 dari 3
Item Kegiatan : Pembesian 100 kg dengan besi polos atau ulir untuk pembesian plat

Length Lap Total Unit


Bar Size Unit Total
per unit Length Length Weight
Sketch / Drawing Mark
(mm) (nos) (m) (m) (m) (kg/m) (kg)
1 2 3=n 4 = a + b + c +... 5 6 = 3x4 7 8 = 6x7

- Jumlah Besi Supprot E.1 (nos)


- Jumlah Besi D = 10mm (nos) = 2 bh
- Panjang Tulangan Pokok Per Unit (m) = ( 2a + 2b + c ) = 0.45 m

- Jumlah Besi Supprot E.2 (nos)


- Jumlah Besi D = 10mm (nos) = 2 bh
- Panjang Tulangan Bagi Per Unit (m) = ( a + b + c ) = 0.45 m
9. Besi Support Lantai
a = 0.15 m E1 10 2 0.75 - 1.50 0.617 0.93
c
a b b a b = 0.15 m
c = 0.15 m
n = 2.00 bh

10. Besi Support Dinding


a = 0.15 m E2 10 8 0.45 - 3.60 0.617 2.22
c
b a
b = 0.15 m
c = 0.15 m
n = 8.00 bh
(ka;ki)

Total Besi D. 3.15

Total pembesian 1 Frame (Sub Total A. + B. + C. + D) 40.56

Jumlah Balok Melintang = 5 bh )

Total Pembesian ( B. ) ( 40.56 x 5.00 ) 202.80

TOTAL PEMBESIAN ( A. + B. ) 8,409.76


Disetujui : Dicheck oleh : Disiapkan oleh :

Mardono Yohan Novara Petrus Widyatama, S.T. Istianah, S.T.


Pengawas Lap-1 Pengawas Lap-2 Konsultan Kontraktor
Quantity Surveyor
REHABILITASI JARINGAN IRIGASI D.I PROGO MANGGIS Kontrak Nomor : 10/PKK/PJPA.SO/2017
SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC NUSANTARA
Kegiatan Irigasi dan Rawa II TA.2017-2019 Konsultan : PT. WAHANA KRIDA KONSOLINDO

HITUNGAN VOLUME BONGKARAN PASANGAN BATU


Jenis Pekerjaan : Pekerjaan Beton Status Hitungan : MC - 0
Lokasi : Saluran Induk Manggis No. Lembar Halaman : dari
Item Kegiatan : Bongkar pasangan batu

Quantity
Section Type Sketch / Gambar Hitungan Pot- Unit Accum.
Jml
(m3) (m3)

A. ### Section Saluran Yang Dikerjakan (Hm.189+00 s/d Hm.189+50)


L = #REF! M

I. Timbunan pasir sebagai bahan pengisi beton precast


I = 0.20 X 0.08 X 0.50 = 0.008 m2
II = 2.40 X 0.20 = 0.480 m2
C
III = (( 0.12 + 0.20 ) / 2 ) X 0.20 = 0.032 m2
L

A ( I + II + III ) = 0.520 m2

Vol. = P X A X t
= #REF! X 0.52 X 0.20 = #REF! m3 #REF! 2 #REF!
(ka;ki)

Sub Total A #REF!


TOTAL ( Sub Total A ) #REF!
Disetujui : Dicheck oleh : Disiapkan oleh :
Pengawas Lapangan

Yohan Novara Surono Mardono Istianah,ST


Pengawas Lap-1 Pengawas Lap-2 Pengawas Lap-3 Konsultan Kontraktor
1.00
Quantity Surveyor
REHABILITASI JARINGAN IRIGASI D.I PROGO MANGGIS Kontrak Nomor : 10/PKK/PJPA.SO/2017
SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC NUSANTARA
Kegiatan Irigasi dan Rawa II TA.2017-2019 Konsultan : PT. WAHANA KRIDA KONSOLINDO

HITUNGAN VOLUME BONGKARAN PASANGAN BATU


Jenis Pekerjaan : Pekerjaan Beton Status Hitungan : MC - 0
Lokasi : Saluran Induk Progo No. Lembar Halaman : dari
Item Kegiatan : Bongkar pasangan batu

Quantity
Section Type Sketch / Gambar Hitungan Pot- Unit Accum.
Jml
(m3) (m3)

A. BONGKARAN PASANGAN BATU UNTUK BALOK MELINTANG DINDING


N = 66.00 bh I. Bongkaran Pasangan Batu Untuk Balok Melintang
a. = 0.15 X 0.06 X 0.50 = 0.005 m2
b. = (( 2.40 + 2.32 ) / 2 ) X 0.15 = 0.354 m2
A ( I + II ) = 0.359 m2

Vol. = N X A X L
= 66.00 X 0.359 X 0.40 = 9.48 m3 9.48 1 9.47

Sub Total A
TOTAL ( Sub Total A )
Disetujui : Dicheck oleh : Disiapkan oleh :
Pengawas Lapangan

Yohan Novara Surono Mardono Istianah,ST


Pengawas Lap-1 Pengawas Lap-2 Pengawas Lap-3 Konsultan Kontraktor
1.00
Quantity Surveyor
REHABILITASI JARINGAN IRIGASI D.I PROGO MANGGIS Kontrak Nomor : 10/PKK/PJPA.SO/2017
SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC NUSANTARA
Kegiatan Irigasi dan Rawa II TA.2017-2019 Konsultan : PT. WAHANA KRIDA KONSOLIND

HITUNGAN VOLUME GALIAN MANUAL


Jenis Pekerjaan : Pekerjaan Tanah Status Hitungan : TERMYN-02
Lokasi : Saluran Induk Manggis Acuan Gambar Rencana :
Item Kegiatan : Galian tanah biasa diangkut sejauh 10 m No. Lembar Halaman : 1 of

CALCULATION SKETCH

Galian Balok Memanjang Dasar dan Atas Saluran #REF!


Galian Balok Memanjang Atas Saluran Panjang Galian = #REF! M
Coordinate
Point A B C
x y
0 - - -
0 - - -
1 2.874 2.280 6.55 5.51 0.52
2.530
2 2.415 2.280 6.11 5.39 0.36
3 2.37 2.530 5.98 6.64 (0.33)
2.280 2.280
4 2.62 2.530 5.98 7.27 (0.64)
5 2.874 2.280 - - -
0 - - -
0 - - -
0 - - -
0 - - -
0 - - -
0 - - -
0 - - - 1.5 2 2.5 3 3.5 4
Galian Manual

0 - - -
0 - - - VOLUME GALIAN = A
Galian Manual

0 = 0.09
(sq.m) 0.09

Galian Balok Memanjang Bawah Saluran Panjang Galian = #REF! M


CL

Coordinate
Point A B C
x y
0 - - -
Galian Manual

1 4.054 1.280 4.58 5.15 (0.28)


2 4.024 1.130 4.55 4.21 0.17
Galian Manual

1.505
3 3.724 1.130 5.60 4.12 0.74
4 3.649 1.505 4.67 5.83 (0.58) 1.280 1.2
5 3.874 1.280 4.96 5.19 (0.12)
1.130 1.13
6 4.054 1.280 - - -
0 - - -
0 - - -
0 - - -
0 - - -
0 - - -
0 - - - 2.5 3 3.5 4
0 - - -
0 - - -
0 - - - VOLUME GALIAN = A
0 = 0.07
(sq.m) 0.07
Remarks:
A = Xn*Y(n+1) B = X(n+1)*Yn C = (A - B)/2

Disetujui : Dicheck oleh :


Direksi Pekerjaan

Surono Mardono Yohan Novara Sigit Andi Raharjo, S.T.


Pengawas Lap-1 Pengawas Lap-2 Pengawas Lap-3 Konsultan
: 10/PKK/PJPA.SO/2017
: PT. SAC NUSANTARA
: PT. WAHANA KRIDA KONSOLINDO

VOLUME GALIAN MANUAL ChartChart


TitleTitle

SKETCH

2.530
2.5

2.280 2.280

1.5
1.5 2 2.5 3 3.5 4 4.5 5 5.5

x P
x #REF! = #REF! m3
= #REF! m3 (ka;ki)

1.505
1.5

1.2801.280
1.130 1.130

0.5
2.5 3 3.5 4 4.5 5

x P
x #REF! = #REF! m3
= #REF! m3 (ka;ki)

TOTAL #REF! m3
Disiapkan oleh :

Istianah, S.T.
Kontraktor
Quantity Surveyor
REHABILITASI JARINGAN IRIGASI D.I PROGO MANGGIS Kontrak Nomor : 10/PKK/PJPA.SO/2017
SNVT PJPA SERAYU OPAK Kontraktor : PT. SAC NUSANTARA
Kegiatan Irigasi dan Rawa II TA.2017-2019 Konsultan : PT. WAHANA KRIDA KONSOLIND

HITUNGAN VOLUME TIMBUNAN


Jenis Pekerjaan : Pekerjaan Tanah Status Hitungan : TERMYN02
Lokasi : Saluran Induk Manggis Acuan Gambar Rencana :
Item Kegiatan : Timbunan tanah atau Urugan tanah kembali manual No. Lembar Halaman : 1 of

CALCULATION SKETCH

Timbunan Kembali Balok Memanjang Dasar dan Atas Saluran #REF!

Galian Balok Memanjang Atas Saluran Panjang Timbunan = #REF! M


Coordinate
Point A B C
x y
0 - - -
1 2.465 2.488 5.64 6.13 (0.25)
2 2.465 2.288 5.64 5.50 0.07
3 2.405 2.288 5.98 5.41 0.29
2.488
2.488
4 2.37 2.488 5.88 6.13 (0.12)
2.288
2.288
5 2.47 2.488 - - -
0 - - -
0 - - -
0 - - -
0 - - -
0 - - -
Timbunan

0 - - -
0 - - -
1.5 2 2.5
Timbunan

0 - - -
0 - - -
0 - - - VOLUME GALIAN = A
0 = 0.02
(sq.m) 0.02
CL

Galian Balok Memanjang Bawah Saluran Panjang Galian = #REF! M


Coordinate
Timbunan

Point A B C
x y
0 - - -
Timbunan

1 3.774 1.138 4.29 4.23 0.03


2 3.714 1.138 5.43 4.15 0.64
1
3 3.649 1.463 4.88 5.52 (0.32)
4 3.774 1.338 4.29 5.05 (0.38)
5 3.774 1.138 - - -
0 - - -
1 4.054 1.238 4.61 4.99 (0.19)
2 4.034 1.138 4.59 4.52 0.03
3 3.974 1.138 4.92 4.52 0.20
4 3.974 1.238 4.92 5.02 (0.05)
5 4.054 1.238 - - -
0 - - - 2 2.5 3 3.5
0 - - -
0 - - -
0 - - - VOLUME GALIAN = A
0 = 0.03
(sq.m) 0.03

Remarks:
A = Xn*Y(n+1) B = X(n+1)*Yn C = (A - B)/2

Disetujui : Dicheck oleh :


Direksi Pekerjaan

Surono Mardono Yohan Novara Sigit Andi Raharjo, S.T.


Pengawas Lap-1 Pengawas Lap-2 Pengawas Lap-3 Konsultan
: 10/PKK/PJPA.SO/2017
: PT. SAC NUSANTARA
: PT. WAHANA KRIDA KONSOLINDO

AN VOLUME TIMBUNAN ChartChart


TitleTitle

SKETCH

3.5

2.488
2.488
2.5
2.288
2.288

1.5

1
1.5 2 2.5 3 3.5

x P
x #REF! = #REF! m3
= #REF! m3 (ka;ki)

1.463
1.5
1.338
1.238
1.238
1.138 1.138
1.138

0.5
2 2.5 3 3.5 4 4.5

x P
x #REF! = #REF! m3
= #REF! m3 (ka;ki)

Sub Total A #REF! m3


Disiapkan oleh :

Istianah, S.T.
Kontraktor
Quantity Surveyor