Anda di halaman 1dari 7

PEMILIK KEGIATAN

JONEGOR O
BO

R AHARJA MAW
A
RTA KA
KA Y
ER

R
30

A
J
1∅11.7 DINAS PERUMAHAN, KAWASAN
20 PERMUKIMAN DAN CIPTA KARYA
Hole 4 x ∅ 22 mm 8∅11.7
KABUPATEN BOJONEGORO
For Anchor Bolt ∅ 19 mm
12∅9.7-150 NAMA PROGRAM

14∅9.7-150
PROGRAM PENGEMBANGAN PERMUKIMAN

4∅18.7
NAMA KEGIATAN
PENYELENGGARAAN INFRASTRUKTUR PADA
5 30 5 PERMUKIMAN DI KAWASAN STRATEGIS
40 DAERAH KABUPATEN/KOTA
NAMA PEKERJAAN
LAMPU PJU LED 90 WATT POTONGAN A-A POTONGAN B-B
NTS NTS PEMASANGAN BARU JARINGAN
PJU RUAS SELOGABUS - MALO

40 LOKASI PEKERJAAN

Besi Grounding 1∅11.7 KECAMATAN TRUCUK DAN MALO


KABUPATEN BOJONEGORO
3∅11.7
3∅11.7 TAHUN ANGGARAN
JARINGAN TEGANGAN LAMPU TIDAK 40
RENDAH ( JTR) MILIK PLN TERMASUK PEKERJAAN 14∅9.7-150 P-APBD TAHUN 2021
3∅11.7
CATATAN TANGGAL

ASESORIS KABEL JTR 30


suspension bracket
suspension clamp POTONGAN C-C
NTS
JARINGAN PJU
TWISTED 2x10 mm²
CL

ASESORIS KABEL PJU TR1 A


Perapian Pondasi
JARINGAN PJU
TWISTED 2x16 mm²
KABEL NYY 2x2,5mm B
20

DARI JARINGAN KE LAMPU


Beton Fc' 21,7 MPa
MCB

c
200
DETAIL 1 180
Detail 1
NTS
250

TIANG PLN TIANG PJU OKTAGONAL H9


JUDUL GAMBAR SKALA
5 30 5
40 - DETAIL PEMASANGAN TIANG NTS
Besi Grounding 1∅11,7 PJU OKTAGONAL H9

- DETAIL PEMBESIAN PONDASI NTS

DETAIL A-A DETAIL PEMBESIAN PONDASI


DETAIL PEMASANGAN TIANG PJU OKTAGONAL H9 NTS

KODE GBR. NO. GAMBAR JUMLAH GBR.

PJU 2021 22 28
PEMILIK KEGIATAN
GAMBAR DETAIL BOX PHB-APP
40 x 20 x 65 CM (1 PINTU 1 PHASE) BO
JONEGOR O

R AHARJA MAW
A
RTA KA
KA

RY
JER

A
DINAS PERUMAHAN, KAWASAN
0,035
0.02 PERMUKIMAN DAN CIPTA KARYA
0.02
KABUPATEN BOJONEGORO
NO. PEL. : 0.05

0.055
0.02 NAMA PROGRAM

0.18
0.16
0.04 0.025 PROGRAM PENGEMBANGAN PERMUKIMAN
0.02

NAMA KEGIATAN

0.65
0.26
R Y G
PENYELENGGARAAN INFRASTRUKTUR PADA
0.325
PERMUKIMAN DI KAWASAN STRATEGIS
Pilot Lamp 22 mm DAERAH KABUPATEN/KOTA
0.04 0.025
NAMA PEKERJAAN

PEMASANGAN BARU JARINGAN


PJU RUAS SELOGABUS - MALO

0.048
0.025
0.10 0.15 0.10
0.04 0.025 0,025
0.40
LOKASI PEKERJAAN
0.40

KECAMATAN TRUCUK DAN MALO


Jaringan IN
HK
70
TAMPAK DEPAN TAMPAK BELAKANG KABUPATEN BOJONEGORO
35-

HK
Asesoris Kabel PJU TR2 SATUAN MM SATUAN MM
35-

TAHUN ANGGARAN
70

0.255

0.075
P-APBD TAHUN 2021
0.43
CATATAN TANGGAL
0.40

0.125
Jaringan PJU
Twisted 2x16 mm² Pipa PVC ∅ 2" 2 Buah ( JARINGAN IN/OUT KABEL )

Ø0.052

0.65
Panel PJU LUBANG PIPA IN / OUT KABEL
0.135

LUBANG PIPA GROUND KABEL

Gland Cable PG 36
Gland Cable PG 11 TAMPAK BAWAH
SATUAN MM
Selang Spiral 2" (2 Buah)

0.095
Pipa PVC ∅ 3/4 "
(Kabel BC 16mm²)
0.20

1.5 m 0.02

TAMPAK SAMPING
Tiang Bulat Pemasangan Panel SATUAN MM
1.5 M Dari Permukaan Tanah

Grounding Clamp KWH Meter 1 Phase


MCB 1 Phase
Timer Theben TR 610 Top 3
Kontaktor Schneider LC1D40
TIMER

Grounding Rod ± 2m, maks 5 Ω JUDUL GAMBAR SKALA


Selector Switch TIMER

- DETAIL PEMASANGAN PANEL NTS


MCB 1 Phase 25 A APP 1 PHASE
MCB 1 Phase 20 A - DETAIL BOX PANEL APP 1 NTS
Terminal Blok 4p 60 A PHASE
MCB 1 Phase 6 A
Busbar Pertanahan/PE
DETAIL B-B
DETAIL PEMASANGAN PANEL PJU 1 PHASE
TAMPAK DALAM DETAIL PENEMPATAN KOMPONEN KODE GBR. NO. GAMBAR JUMLAH GBR.
NTS NTS
PJU 2021 23 28
PEMILIK KEGIATAN
Baut Kunci L
LAMPU TIDAK
TERMASUK PEKERJAAN
JONEGOR O
BO

CL POLE Nomor Panel APP R AHARJA MAW


A
RTA KA
KA

RY
JER

A
1500
TOP OF POLE DINAS PERUMAHAN, KAWASAN
Ø 66mm t= 2,8 mm
7 SEGMENT - B
4 Kode Jaringan Line (A = Menuju
PERMUKIMAN DAN CIPTA KARYA
KABUPATEN BOJONEGORO
Awal Ruas, B = Menuju Akhir Ruas) NAMA PROGRAM
100 Shock pipa 2"
t= 2,3 mm B

( MINIMAL 25 )
=
Nomor Tiang PROGRAM PENGEMBANGAN PERMUKIMAN

14
00

300
3600
SEGMENT - B
14 NAMA KEGIATAN
4 PENYELENGGARAAN INFRASTRUKTUR PADA
SEGMENT - A B PERMUKIMAN DI KAWASAN STRATEGIS
14 DAERAH KABUPATEN/KOTA
NAMA PEKERJAAN
Penomoran Tiang
1
PEMASANGAN BARU JARINGAN
300
DETAIL - 1 DETAIL HAND HOLE DETAIL PENOMORAN TIANG PJU RUAS SELOGABUS - MALO
SLIP JOINT SATUAN MM
LOKASI PEKERJAAN

Anchor Bolt KECAMATAN TRUCUK DAN MALO


9000 Ø 19 mm KABUPATEN BOJONEGORO

TAHUN ANGGARAN
SEGMENT - A
P-APBD TAHUN 2021
PLATE t = 6 mm
2-NUT Ø 22 RING Ø 22 20
19
5700
A A CATATAN TANGGAL

150
500 12 ∅9.7
40
30
80 ∅9.7 - 150
1500
100
RIP PLATE t = 6 mm
8 ∅ 11.7
BASE PLATE 300 x 300 x 16 DETAIL ANCHOR BOLT DETAIL RIP PLATE
2
NTS SATUAN MM
BOTTOM OF POLE Ø 150 mm t= 2,8 mm 195

DETAIL TIANG OKTAGONAL H9


SATUAN CM 250

Besi Grounding 1 ∅11.7

30

8∅11.7
20
POLE t = 2.8 mm 5
5 CL 12∅9.7
CL POLE
HOLE ∅ 22mm

RIP PLATE 5
14∅9.7-150
2 t = 6 mm 15 15
JUDUL GAMBAR SKALA

15 30 20 14
4∅18.7 30 - DETAIL PEMASANGAN TIANG NTS
LAMPU PJU OKTAGONAL H9 M
1.6
20 - DETAIL PEMBESIAN PONDASI NTS
BASE PLATE 5
15 300 x 300 x 16 30
20 BASE PLATE RIP PLATE
30 t = 16 mm t = 6 mm

DETAIL - 2 DETAIL BASE PLATE DETAIL PEMBESIAN PONDASI H9 KODE GBR. NO. GAMBAR JUMLAH GBR.
SATUAN CM SATUAN CM SATUAN CM
PJU 2021 24 28
PEMILIK KEGIATAN

JONEGOR O
BO

R AHARJA MAW
A
RTA KA
KA

RY
JER

A
DINAS PERUMAHAN, KAWASAN
PERMUKIMAN DAN CIPTA KARYA
4.4
KABUPATEN BOJONEGORO
2.5
NAMA PROGRAM
10.0

6.0 PROGRAM PENGEMBANGAN PERMUKIMAN

8.6 8.6 12.5 6.9 NAMA KEGIATAN


Tampak Samping PENYELENGGARAAN INFRASTRUKTUR PADA
8.2 PERMUKIMAN DI KAWASAN STRATEGIS
DAERAH KABUPATEN/KOTA

3.5
NAMA PEKERJAAN

Tampak Belakang 2.2 8.3 PEMASANGAN BARU JARINGAN


16.5 9.0
Tampak Samping Tampak Depan PJU RUAS SELOGABUS - MALO
Tampak Samping
LOKASI PEKERJAAN
1.0
SUSPENSION BRACKET SUSPENSION CLAMP KECAMATAN TRUCUK DAN MALO
NTS NTS 3.0 3.0 3.0 KABUPATEN BOJONEGORO
9.0
Tampak Atas TAHUN ANGGARAN

P-APBD TAHUN 2021


6.9
R0.8 CATATAN TANGGAL
0.4 0.8
3.0
0.8
4.0 1.0 3.0

0.8
3.0
6.4 6.6
Tampak Samping Tampak Samping 2.0 2.9 2.0
Tampak Depan Kanan Kiri 8.7
Tampak Belakang
Tampak Samping

TANSION BRACKET
NTS

8.7
0.8 0.4
Tampak Bawah Tampak Atas

8.2 4.1000
0.9
TAP CONNECTOR
NTS

0.4
6.4 6.6
JUDUL GAMBAR SKALA
tebal Plat 1 mm
- DETAIL ASSESORIS - NTS
Tampak Atas ASSESORIS, KABEL, DAN
JARINGAN

LINK STOPPING BUCKLE SERVICE WIDE CLAMP (SWC) STAINLESS STELL


NTS NTS NTS NTS

KODE GBR. NO. GAMBAR JUMLAH GBR.

PJU 2021 25 28
PEMILIK KEGIATAN

JONEGOR O
BO

R AHARJA MAW
A
RTA KA
KA

RY
JER

A
DINAS PERUMAHAN, KAWASAN
PERMUKIMAN DAN CIPTA KARYA
KABUPATEN BOJONEGORO
NAMA PROGRAM

1 ANCHOR ROD PROGRAM PENGEMBANGAN PERMUKIMAN

NAMA KEGIATAN
PLAT BETON 0.4 x 0.4 x 0.12
PENYELENGGARAAN INFRASTRUKTUR PADA
PERMUKIMAN DI KAWASAN STRATEGIS
DAERAH KABUPATEN/KOTA
NAMA PEKERJAAN

PEMASANGAN BARU JARINGAN


DETAIL 3 PJU RUAS SELOGABUS - MALO
NTS
42° LOKASI PEKERJAAN
BEGEL
KAWAT BAJA 16mm KECAMATAN TRUCUK DAN MALO
SPAN SCROF KABUPATEN BOJONEGORO

U-CLAMP TAHUN ANGGARAN

P-APBD TAHUN 2021

CATATAN TANGGAL
800 100 MINIMUM

DETAIL 1
NTS

250 MINIMUM

48° Pipa Galvanis 1" Panjang 2 m, U-CLAMP


Dicat Hitam Putih

2 ANCHOR ROD

MTA MTA 30
DETAIL 2
NTS

180
ANCHOR ROD NO. SIMBOL KETERANGAN JUMLAH

1.50
1. Klem Beugel 1 Buah

JUDUL GAMBAR SKALA


3 2. Span Scrof 1 Buah
- DETAIL TRACK SCHOOR NTS
3. Klem Staal Draad 2 Buah

DETAIL TRACK SCHOOR Kausen


4. 2 Buah
NTS
5. Steel Wire (Kawat sling) 16 mm2 10,7 m

6. Trek Angker 1 Buah KODE GBR. NO. GAMBAR JUMLAH GBR.

Plat Beton 40 cm x 40 cm x 12 cm PJU 2021 26 28


7. 1 Buah
PEMILIK KEGIATAN

JONEGOR O
BO

R AHARJA MAW
A
RTA KA
KA

RY
JER

A
DINAS PERUMAHAN, KAWASAN
PERMUKIMAN DAN CIPTA KARYA
KABUPATEN BOJONEGORO
NAMA PROGRAM

PROGRAM PENGEMBANGAN PERMUKIMAN

1 NAMA KEGIATAN
6 1 2 2
3 PENYELENGGARAAN INFRASTRUKTUR PADA
3 PERMUKIMAN DI KAWASAN STRATEGIS
5 3 DAERAH KABUPATEN/KOTA
4 NAMA PEKERJAAN
4
PEMASANGAN BARU JARINGAN
4 PJU RUAS SELOGABUS - MALO

LOKASI PEKERJAAN

KECAMATAN TRUCUK DAN MALO


KABUPATEN BOJONEGORO

TAHUN ANGGARAN

P-APBD TAHUN 2021

CATATAN TANGGAL
DETAIL ASESORIS TIANG JARINGAN LURUS (TR 1) DETAIL ASESORIS TIANG SUDUT DAN AWAL (TR 2) DETAIL ASESORIS TIANG AKHIR (TR 3)
NTS NTS NTS

2 Eksisting
1

Rencana

JUDUL GAMBAR SKALA


NO. KETERANGAN JUMLAH
- DETAIL ASESORIS TIANG NTS
1. Tension bracket 1 Buah JARINGAN PJU
DETAIL ASESORIS TIANG PENEGANG (TR 5) DETAIL ASESORIS TIANG EXISTING (TR 7)
2. Strain clamp 1 Buah
NTS NTS
3. Stainless steel strip 2,4 Meter

4. Stopping buckle 2 Buah

Suspension Bracket KODE GBR. NO. GAMBAR JUMLAH GBR.


5. 1 Buah

Suspension Clamp PJU 2021 27 28


PEMILIK KEGIATAN
Pipa Atas Tertutup

JONEGOR O
BO

R AHARJA MAW
A
RTA KA
KA

RY
JER

A
DINAS PERUMAHAN, KAWASAN
PERMUKIMAN DAN CIPTA KARYA
KABUPATEN BOJONEGORO
∅ 3" MEDIUM
NAMA PROGRAM

PROGRAM PENGEMBANGAN PERMUKIMAN

NAMA KEGIATAN
∅20 = ∅30 = M40 PENYELENGGARAAN INFRASTRUKTUR PADA
MTA
PERMUKIMAN DI KAWASAN STRATEGIS
DAERAH KABUPATEN/KOTA
NAMA PEKERJAAN

PEMASANGAN BARU JARINGAN


PJU RUAS SELOGABUS - MALO

LOKASI PEKERJAAN

DETAIL TIANG BULAT 6m KECAMATAN TRUCUK DAN MALO


SKALA 1 : 20 KABUPATEN BOJONEGORO

TAHUN ANGGARAN

P-APBD TAHUN 2021


500 40
CATATAN TANGGAL
30

600

∅ 3"
Pipa Besi Bulat 3"

∅20 = ∅30 = M40


20 MTA
40
20

MTA MTA
40

JUDUL GAMBAR SKALA


100
- DETAIL TIANG BULAT 3" 1 : 25
- DETAIL PONDASI 1 : 20
100 - DETAIL TIANG BULAT 6m 1 : 20

DETAIL PONDASI KODE GBR. NO. GAMBAR JUMLAH GBR.


DETAIL TIANG BULAT 3" SKALA 1 : 20
SKALA 1 : 25 PJU 2021 28 28

Anda mungkin juga menyukai