Anda di halaman 1dari 207

BADAN PENGUSAHAAN KAWASAN

PERDAGANGAN BEBAS DAN PELABUHAN BEBAS BINTAN


WILAYAH KOTA TANJUNGPINANG

RENCANA ANGGARAN BIAYA ( R A B )


PENYUSUNAN DED SISI DARAT
PELABUHAN TANJUNG MOCO

No URAIAN PEKERJAAN JUMLAH HARGA


(1) (2) (3)
I PEKERJAAN PERSIAPAN Rp 1,983,755,626.00
II PEKERJAAN PEMATANGAN LAHAN Rp 3,444,910,000.00
III PERKERASAN JALAN Rp 15,243,789,456.00
IV FASILITAS BANGUNAN DARAT
A KANTOR PELABUHAN Rp 1,229,058,522.72
B KANTOR KSOP Rp 4,853,068,809.72
C GUDANG PELABUHAN Rp 2,774,869,218.75
D KANTOR IMIGRASI, K3, KARANTINA, BEA CUKAI Rp 502,904,771.65
E POS JAGA Rp 199,831,850.32
F MUSHOLA Rp 176,621,190.44
G GAPURA Rp 286,692,634.62
H LAPANGAN SEMENISASI Rp 4,414,086,555.49
I LAPANGAN PENUMPUKAN TERBUKA Rp 1,703,764.00
J LAPANGAN PARKIR Rp 2,414,860,337.60
K PAGAR BRC Rp 881,769,098.40
L LANSEKAP Rp 874,509,200.00
M MARKA & KANSTEIN Rp 227,526,527.66
N PEKERJAAN SIGNAGE Rp 46,649,406.00
V PEKERJAAN MEP
A PEKERJAAN MECHANICAL & PLUMBING
A.1 PEKERJAAN WATER TANK Rp 224,434,741.89
A.2 PEKERJAAN SEPTIC TANK Rp 255,704,260.00
A.3 PEKERJAAN DRAINASE SALURAN Rp 1,755,101,534.28
A.4 PEKERJAAN AIR BERSIH DAN AIR KOTOR Rp 148,173,724.64
B PEKERJAAN ELEKTRIKAL
B.1 PEMASANGAN KABEL Rp 412,926,011.46
B.2 PEMASANGAN KONSTRUKSI PJU Rp 731,945,581.61
C. APAR/APAB Rp 70,864,919.32
D RUMAH GENSET Rp 583,748,296.55
E. SISTEM PENAMPUNGAN AIR HUJAN (SPAH) Rp 167,274,115.58
SUB TOTAL I Rp 43,906,780,154.69
PPN 10% Rp 4,390,678,015.47
SUBTOTAL II Rp 48,297,458,170.16
SUPERVISI Rp 1,097,669,503.87
TOTAL Rp 49,395,127,674.02
PEMBULATAN Rp 49,395,127,000.00
TERBILANG :
Empat Puluh Sembilan Milyar Tiga Ratus Sembilan Puluh Lima Juta Seratus Dua Puluh Tujuh Ribu Rupiah
BADAN PENGUSAHAAN KAWASAN
PERDAGANGAN BEBAS DAN PELABUHAN BEBAS BINTAN
WILAYAH KOTA TANJUNGPINANG

RENCANA ANGGARAN BIAYA ( R A B )


PENYUSUNAN DED SISI DARAT
PELABUHAN TANJUNG MOCO

No URAIAN PEKERJAAN JUMLAH HARGA


1 2 3
I PEKERJAAN PERSIAPAN Rp 1,547,661,892.50
II PEKERJAAN PEMATANGAN LAHAN Rp 2,811,818,786.23
III PERKERASAN JALAN DAN DRAINASE #REF!
IV FASILITAS BANGUNAN DARAT
A KANTOR PELABUHAN Rp 800,144,769.98
B KANTOR KSOP Rp 2,722,875,187.93
C GUDANG PELABUHAN Rp 1,927,013,474.53
D KANTOR IMIGRASI, K3, KARANTINA, BEA CUKAI Rp 308,653,061.48
E POS JAGA Rp 153,483,210.77
F MUSHOLA Rp 148,717,074.63
G TANGKI AIR Rp -
H RUMAH GENSET Rp 149,145,000.00
I GAPURA Rp 255,104,092.44
J LAPANGAN SEMENISASI Rp 18,042,344,265.05
K LAPANGAN PENUMPUKAN TERBUKA Rp 3,556,837,279.91
L LAPANGAN PARKIR Rp -
M GANGWAY DAN PAGAR BRC Rp -
N LAMPU PJU DAN TAMAN Err:509
O LANSEKAP Rp 40,193,558.25
P MARKA & KANSTEIN Rp 153,522,527.66
R PEKERJAAN SIGNAGE Rp 46,649,406.00
V PEKERJAAN LAIN-LAIN Rp 25,000,000.00
SUB TOTAL I Err:509
PPN 10% Err:509
SUBTOTAL II Err:509
SUPERVISI Err:509
TOTAL Err:509
PEMBULATAN Err:509
TERBILANG :
Empat Puluh Tujuh Miliar Empat Ratus Dua Puluh Dua Juta Empat Ratus Dua Puluh Tiga Ribu Rupiah
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERHUBUNGAN LAUT
KANTOR KESYAHBANDARAN DAN OTORITAS PELABUHAN KELAS II TANJUNG PINANG

RENCANA ANGGARAN BIAYA ( R A B )


PENYUSUNAN DED SISI DARAT
PELABUHAN TANJUNG MOCO

SATUA VOLUME HARGA SATUAN JUMLAH HARGA


No. URAIAN PEKERJAAN
N Rp Rp
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi Peralatan Ls 1.00 770,710,352.86 Rp 770,710,352.86
2 Pengukuran dan Positioning Ls 1.00 112,200,000.00 Rp 112,200,000.00
3 PDA Test Ls 1.00 114,099,693.75 Rp 114,099,693.75
4 Direksi Keet dan Gudang Ls 1.00 205,920,000.00 Rp 205,920,000.00
5 Penerangan dan Keselamatan Kerja Ls 1.00 111,781,560.00 Rp 111,781,560.00
6 Pelaporan dan Dokumentasi Ls 1.00 190,740,000.00 Rp 190,740,000.00
SUBTOTAL I Rp 1,505,451,606.61
II PEKERJAAN PEMATANGAN LAHAN
1 Pekerjaan Pematangan Lahan
- Pembersihan Lahan (Grubbing & Clearing) m2 35000 25,736.89 Rp 900,791,293.71
- Pembersihan Lahan (Stripping, t=1 m) m2 35000 58,612.42 Rp 2,051,434,620.27
SUBTOTAL 2 Rp 2,952,225,913.98
III PERKERASAN JALAN DAN DRAINASE
1 Pekerjaan Jalan dan Drainase m2 7056.000 1,808,821.00 Rp 12,763,040,976.00
SUBTOTAL 3 Rp 12,763,040,976.00
IV FASILITAS BANGUNAN DARAT
A TERMINAL PENUMPANG & KANTIN
1 Pekerjaan Tanah
Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 329.57 89,100.00 Rp 29,364,243.88
Pekerjaan urugan kembali (backfill) m3 115.35 44,000.00 Rp 5,075,374.86
Pekerjaan buangan sisa galian ke disposal m3 16.58 33,235.28 Rp 551,182.02
Timbunan Tanah, t=150mm m3 115.70 247,500.00 Rp 28,635,739.76
Timbunan Pasir, t=100mm m3 76.98 296,560.00 Rp 22,830,101.78
2 Pekerjaan Pondasi Batu Kali
Pondasi Batu kali m3 329.57 1,059,459.50 Rp 349,160,797.22
Aanstamping m3 24.49 537,681.00 Rp 13,169,440.96
Pasir Urug m3 12.25 180,500.00 Rp 2,210,496.66
3 Pekerjaan Beton K-175
Lantai kerja m3 70.46 1,355,172.42 Rp 95,490,942.34
4 Pekerjaan Beton Bertulang K-250 Insitu
Sloof
a Pekerjaan Beton K-250 m3 329.57 2,219,663.58 Rp 731,523,487.98
Pekerjaan Pembesian kg 992.75 15,749.00 Rp 15,634,839.78
Pekerjaan Bekisting m2 39.71 299,435.08 Rp 11,890,581.62
b Kolom
Pekerjaan Beton K-250 m3 329.57 2,219,663.58 Rp 731,523,487.98
Pekerjaan Pembesian kg 964.54 15,749.00 Rp 15,190,571.11
Pekerjaan Bekisting m2 34.45 299,435.08 Rp 10,314,917.12
c Balok
Pekerjaan Beton K-250 m3 329.57 2,219,663.58 Rp 731,523,487.98
Pekerjaan Pembesian kg 344.70 15,749.00 Rp 5,428,621.42
Pekerjaan Bekisting m2 13.26 299,435.08 Rp 3,969,774.89
d Ring Balok
Pekerjaan Beton K-250 m3 329.57 2,219,663.58 Rp 731,523,487.98
Pekerjaan Pembesian kg 840.85 15,749.00 Rp 13,242,623.86
Pekerjaan Bekisting m2 33.63 299,435.08 Rp 10,071,257.66
e Dak Atap
Pekerjaan Beton K-250 m3 329.57 2,219,663.58 Rp 731,523,487.98
Pekerjaan Pembesian kg 840.85 15,749.00 Rp 13,242,623.86
Pekerjaan Bekisting m2 33.63 299,435.08 Rp 10,071,257.66
5 Pekerjaan Rangka Atap Baja Ringan
Pemasangan Rangka Baja ringan m2 201.50 350,000.00 Rp 70,526,648.65
6 Pekerjaan Arsitektur
a Pekerjaan Dinding
- Pekerjaan Dinding 1/2 Bata m2 329.57 184,320.00 Rp 60,745,425.73
- Plesteran m2 1769.14 52,701.00 Rp 93,235,548.28
Acian m3 763.25
b Pekerjaan Lantai
- Keramik 600x600mm m2 329.57 492,353.28 Rp 162,262,423.19
- Keramik 400x400mm m2 329.57 172,396.57 Rp 56,815,881.58
- Keramik non slip 600x600mm m2 115.59 350,000.00 Rp 40,457,011.42
- Keramik 200x400mm m2 78.51 300,000.00 Rp 23,553,617.20
c Pekerjaan Plafon
- Plafon Gypsum 9 mm m2 863.44 153,000.00 Rp 132,106,486.90
d Pekerjaan Pintu dan Jendela
- Pintu P1 (900x2300mm) unit 9.00 3,300,000.00 Rp 29,700,000.00
- Pintu P2 (1000x2400mm) unit 1.00 3,500,000.00 Rp 3,500,000.00
- Pintu P3 Pintu & Jendelah Alumunium unit 3.00 5,840,000.00 Rp 17,520,000.00
- Pintu P4 (Pintu dan Jendela) unit 1.00 4,500,000.00 Rp 4,500,000.00
- Jendela J1 Alumunium unit 11.00 2,550,000.00 Rp 28,050,000.00
- Jendela J2 Alumunium unit 1.00 2,500,000.00 Rp 2,500,000.00
- Jendela J3 Alumunium unit 12.00 800,000.00 Rp 9,600,000.00
- Jendela J4 Alumunium unit 9.00 500,000.00 Rp 4,500,000.00
e Pekerjaan Finishing
- Pengecatan Dinding Interior m2 884.57 45,000.00 Rp 39,805,693.18
- Pengecatan Dinding Exterior m2 884.57 55,000.00 Rp 48,651,402.78
- Pengecatan Plafond m2 863.44 45,000.00 Rp 38,854,849.09
f Pekerjaan Penutup Atap
- Pemasangan Atap Metal Zincalumn m2 201.50 180,000.00 Rp 36,270,847.88
- Pemasangan Bubung Metal Zincalumn m' 55.14 200,000.00 Rp 11,028,343.45
- List Plank m' 116.84 200,000.00 Rp 23,368,670.86
7 Pekerjaan listrik
- Pas. Lampu Pijar +Fitting bh 13 125,500.00 Rp 1,571,125.82
- Pas. Lampu Down light + Fitting bh 100 156,000.00 Rp 15,623,625.66
- Pek. Pas. Stop Kontak (with child protection) setara Philips bh 22 25,000.00 Rp 542,487.00
- Pek. Pas. Saklar Tunggal, setara Philips bh 21 25,000.00 Rp 521,622.12
- Pek. Pas. Saklar Ganda, setara Philips bh 29 45,000.00 Rp 1,314,487.74
- Pas. Instalasi Titik Api ttk 184.45 250,000.00 Rp 46,111,395.18
8 Pekerjaan Sanitasi dan saniter
Pas. Closet Duduk + Accessories bh 7 5,316,800.00 Rp 35,499,014.06
Pas. Wastafel + Accessories bh 5 3,457,340.00 Rp 17,312,880.11
Pas. Kran Dinding bh 7 175,000.00 Rp 1,168,433.54
Pas. Instalasi Air Bersih ls 1.00 10,500,000.00 Rp 10,500,000.00
Pas. Instalasi Air Kotor ls 1.00 8,579,300.00 Rp 8,579,300.00
Pek. Septictank ls 1.00 17,558,000.00 Rp 17,558,000.00
SUBTOTAL 4 Rp 5,407,018,049.75
B KANTOR PELABUHAN
1 Pekerjaan Gedung Kantor Pelabuhan m2 756.4694 6,000,000.00 Rp 4,538,816,400.00
SUBTOTAL 5 Rp 4,538,816,400.00
C GUDANG
1 Pekerjaan Gudang m2 756.4694 2,500,000.00 Rp 1,891,173,500.00
SUBTOTAL 6 Rp 1,891,173,500.00
D KANTOR IMIGRASI, KARANTINA, K3, BEA CUKAI
1 Pekerjaan Gedung Kantor Imigrasi m2 151.218 6,000,000.00 Rp 907,310,550.00
SUBTOTAL 7 Rp 907,310,550.00
E MUSHOLA
1 Pekerjaan Gedung m2 151.218 2,000,000.00 Rp 302,436,850.00
SUBTOTAL 8 Rp 302,436,850.00
F RUMAH GENSET
1 Pekerjaan Rumah Genset m2 74.573 2,000,000.00 Rp 149,145,000.00
SUBTOTAL 9 Rp 149,145,000.00
G GAPURA
1 Pekejaan Tanah
Penggalian Tanah untuk Konstruksi m3 23.06 89,100.00 Rp 2,054,353.88
Pengurugan Tanah Kembali untuk Konstruksi m3 17.90 44,000.00 Rp 787,572.72
Pekerjaan buangan sisa galian ke disposal m3 5.16 38,126.00 Rp 196,628.80
2 Pekerjaan Beton K-175 Insitu
a Lean Concrete
Pekerjaan Beton K-175 m3 0.75 1,355,172.42 Rp 1,019,089.66
3 Pekerjaan Beton Bertulang K-250 Insitu
a Pondasi
Pekerjaan Beton K-250 m3 3.46 2,219,663.58 Rp 7,671,157.34
Pekerjaan Pembesian kg 15,749.00 Rp -
Pekerjaan Bekisting m2 6.91 299,435.08 Rp 2,069,695.28
b Sloof
Pekerjaan Beton K-250 m3 1.41 2,219,663.58 Rp 3,125,286.32
Pekerjaan Pembesian kg 15,749.00 Rp -
Pekerjaan Bekisting m2 2.82 299,435.08 Rp 843,209.19
c Kolom & Pedestal
Pekerjaan Beton K-250 m3 5.54 2,219,663.58 Rp 12,305,814.90
Pekerjaan Pembesian kg 15,749.00 Rp -
Pekerjaan Bekisting m2 11.09 299,435.08 Rp 3,320,136.18
d Balok
Pekerjaan Beton K-250 m3 12.34 2,219,663.58 Rp 27,380,660.12
Pekerjaan Pembesian kg 15,749.00 Rp -
Pekerjaan Bekisting m2 24.67 299,435.08 Rp 7,387,362.90
4 Pekerjaan Pengecatan
Pek. Cat Beton Eksterior Pure White m2 45.60 70,000.00 Rp 3,192,000.00
Pek. Cat Beton Eksterior Kolom dan Ring Balok m2 203.68 70,000.00 Rp 14,257,425.00
Pek. Cat Akrilik Panel GRC m2 130.52 150,000.00 Rp 19,577,400.00
Pek. Cat Besi m2 0.84 160,000.00 Rp 133,784.14
5 Pekerjaan Atap & Aksesoris
- Panel Fiber Semen (GRC) t=8 cm + Angkur dan Viser m3 5.22 400,000.00 Rp 2,088,256.00
- Roundbar GRC Panel Support Ø16 kg 26.27 5,250,000.00 Rp 137,929,260.00
- Panel Nama Pelabuhan ACP + Angkur dan Rangka m2 1.95 5,000,000.00 Rp 9,765,000.00
6 Pekerjaan Elektrikal dan Panel Lampu Sorot Gapura ls 12,000,000.00 Rp -
1.00 SUBTOTAL 10 Rp 255,104,092.44

H POS JAGA
1 Pekerjaan Pos Jaga m2 74.573 15,749.00 Rp 1,174,442.37
SUBTOTAL 11 Rp 1,174,442.37
I TANGKI AIR
1 Pekerjaan Tangki Air m2 13.000 4,500,000.00 Rp 58,500,000.00
SUBTOTAL 12 Rp 58,500,000.00
J LAPANGAN PENUMPUKAN SEMENISASI
1 Pekerjaan Lapangan Penumpukan Semenisasi m2 9974.643 1,808,821.00 Rp 18,042,344,265.05
SUBTOTAL 13 Rp 18,042,344,265.05
K LAPANGAN PENUMPUKAN TERBUKA
1 Pekerjaan Lapangan Penumpukan Lapangan Terbuka m2 2087.635 1,703,764.00 Rp 3,556,837,279.91
SUBTOTAL 14 Rp 3,556,837,279.91
L LAPANGAN PARKIR
1 Pekerjaan Lapangan Parkir m2 2087.635 1,808,821.00 Rp 3,776,157,945.28
SUBTOTAL 15 Rp 3,776,157,945.28
M GANGWAY dan PAGAR BRC
1 Pekerjaan Tanah
Penggalian Tanah untuk Konstruksi m3 51.20 89,100.00 Rp 4,561,920.00
Pengurugan Tanah Kembali untuk Konstruksi m3 40.96 44,000.00 Rp 1,802,240.00
Pekerjaan buangan sisa galian ke disposal m3 10.24 38,126.00 Rp 390,410.24
2 Pekerjaan Beton K-175
Lantai m3 48.47 1,355,172.42 Rp 65,683,851.87
3 Pekerjaan Beton Bertulang K-250 Insitu
Pondasi
Pekerjaan Beton K-250 m3 10.72 2,219,663.58 Rp 23,794,793.61
Pekerjaan Pembesian kg 1500.80 15,749.00 Rp 23,636,100.59
Pekerjaan Bekisting m2 21.44 299,435.08 Rp 6,419,888.15
Sloof
Pekerjaan Beton K-250 m3 14.54 2,219,663.58 Rp 32,273,908.49
Pekerjaan Pembesian kg 2035.60 15,749.00 Rp 32,058,666.28
Pekerjaan Bekisting m2 29.08 299,435.08 Rp 8,707,572.17
4 Pekerjaan Baja
Kolom
WF. 100.100.6.8 kg 3845.33 32,068.60 Rp 123,314,439.93
Balok
WF. 100.100.6.8 kg 8068.33 32,068.60 Rp 258,740,119.51
Rafter
WF. 100.100.6.8 kg 3199.87 32,068.60 Rp 102,615,230.37
Joint Plate kg 1511.35 18,657.78 Rp 28,198,497.16
5 Pekerjaan Arsitektur
Pekerjaan Atap
Pemasangan Atap Fiber m2 705.00 55,000.00 Rp 38,775,000.00
Pemasangan Nok m' 235.00 120,000.00 Rp 28,200,000.00
Pekerjaan Jalusi
Jalusi Alumunium m2 274.01 300,000.00 Rp 82,203,000.00
6 Pekerjaan Pemasangan Pagar BRC
Pemasangan Pagar BRC m' 651.20 300,000.00 Rp 195,360,600.00
SUBTOTAL 15 Rp 1,056,736,238.37
N LAMPU PJU & LAMPU TAMAN
Pekerjaan Beton Bertulang K-250 Insitu
a Pondasi Tiang Lampu PJU
Pekerjaan Beton K-250 m3 3.36 2,219,663.58 Rp 7,458,069.64
Pekerjaan Pembesian kg 3.36 15,749.00 Rp 52,916.64
Pekerjaan Bekisting m2 6.72 299,435.08 Rp 2,012,203.75
b Pekerjaan Pemasangan Lampu PJU
Lampu PJU Tunggal bh 10.00 20,000,000.00 Rp 200,000,000.00
Lampu PJU Ganda bh 2.00 25,000,000.00 Rp 50,000,000.00
c Lamu taman bh 8.00 8,759,000.00 Rp 70,072,000.00
SUBTOTAL 16 Rp 329,595,190.03

O LANSEKAP
1 Pemasangan Rumput m2 203.87 50,000.00 Rp 10,193,558.25
2 Penanaman Pohon btg 50.00 600,000.00 Rp 30,000,000.00
SUBTOTAL 17 Rp 40,193,558.25
P MARKA & KANSTIN JALAN
1 Pengecatan Marka (Area Parkir ) m' 545.24 87,500.00 Rp 47,708,500.00
2 Pengecatan Kanstin + Finis Cat m3 46.91 2,255,489.36 Rp 105,814,027.66
SUBTOTAL 18 Rp 153,522,527.66
Q PEKERJAAN SIGNAGE
1 Suspenden Sign SS180 bh 2.00 1,570,888.00 Rp 3,141,776.00
2 Suspenden Sign SS270 bh 1.00 1,570,888.00 Rp 1,570,888.00
3 Suspenden Sign SS320 bh 1.00 1,570,888.00 Rp 1,570,888.00
4 Suspenden Sign SS450 bh 1.00 1,570,888.00 Rp 1,570,888.00
5 Sign Titik Berkumpul bh 2.00 1,203,546.00 Rp 2,407,092.00
6 Flag Mounted FMA28 bh 1.00 570,888.00 Rp 570,888.00
7 Sign Taxi bh 2.00 1,203,546.00 Rp 2,407,092.00
8 Sign Parkir bh 2.00 1,203,546.00 Rp 2,407,092.00
9 Sign Arah Masuk bh 3.00 1,203,546.00 Rp 3,610,638.00
10 Sign Verboden bh 2.00 1,203,546.00 Rp 2,407,092.00
11 Papan Nama Terminal bh 1.00 18,600,000.00 Rp 18,600,000.00
12 Arah Nama Kolom bh 4.00 1,203,546.00 Rp 4,814,184.00
13 Pintu Darurat bh 1.00 1,570,888.00 Rp 1,570,888.00
SUBTOTAL 19 Rp 46,649,406.00
V PEKERJAAN LAIN LAIN
1 Pekerjaan Pembersihan ls 1.00 25,000,000.00 Rp 25,000,000.00
SUBTOTAL 20 Rp 25,000,000.00
RENCANA ANGGARAN BIAYA ( R A B )
DETAILED ENGINEERING DESIGN (DED)
PELABUHAN PENYEBERANGAN SERMATA - PROVINSI MALUKU BARAT DAYA

UNIT PRICE AMOUNT


NO DESCRIPTION UNIT VOLUME
Harga Satuan Jumlah Harga
No Uraian Satuan Volume (Rp.) (Rp.)

I PEKERJAAN PERSIAPAN
1 Mobilisasi dan demobilisasi ls. 1.00 2,784,890,500.00 770,710,352.86
2 Stakeout & Positioning ls. 1.00 294,516,000.00 112,200,000.00
3 Penerangan dan Keselamatan Kerja ls. 1.00 252,000,000.00 111,781,560.00
4 Direksi Keet dan Gudang ls. 1.00 102,219,600.00 205,920,000.00
5 Dokumentasi & Administrasi ls. 1.00 173,400,000.00 173,400,000.00
SUB-TOTAL I 1,374,011,912.86

II PEKERJAAN PEMATANGAN LAHAN


1 Pekerjaan Pematangan Lahan
1.1 Pembersihan Lahan (Grubbing & Clearing) m2 7,131.00 25,610.54 182,628,760.74
1.2 Pembersihan Lahan (Stripping, t=1 m) m2 7,131.00 58,609.93 417,947,440.01
SUB-TOTAL II 600,576,200.75

III PEKERJAAN TIMBUNAN


1 Pekerjaan Pekerasan Jalan
a. Batu Pecah CBR >80% m3 #NAME? #NAME?
b. CTB K-100 m3 #NAME? #NAME?
c. Pasir yang dipadatkan m3 -
d. Paving Blok K-500 m2 -
2 Pekerjaan Beton K-175
a. Lantai kerja m3 -
3 Pekerjaan Beton Bertulang K-250 Insitu
3.1 Saluran Drainase Terbuka (U-Ditch)
a. Pekerjaan Beton K-250 m3 -
b. Pekerjaan Pembesian kg -
c. Pekerjaan Bekisting m2 -
3.2 Saluran Drainase Tertutup (Box Culvert)
a. Pekerjaan Beton K-250 m3 -
b. Pekerjaan Pembesian kg -
c. Pekerjaan Bekisting m2 -
SUB-TOTAL -
IV PEKERJAAN CAUSEWAY
1 Pekerjaan Causeway
1.1 Causeway
a. Pekerjaan Aspal Lapen Macadam, t= 5 - 7 cm m2 122.01 375,876.22 45,860,657.60
b. Pekerjaan Base Course, t = 10 cm m3 12.20 738,803.11 9,014,136.76
c. Pekerjaan Sub Base Course, t = 30 cm m3 35.56 791,801.85 28,154,256.76
d. Pekerjaan Timbunan Tanah m3 171.51 707,842.87 121,402,980.71
e. Pekerjaan Timbunan Pasir m3 329.97 753,052.02 248,484,575.64
f. Pekerjaan Batu 80 - 100 kg/unit m3 235.69 1,090,439.18 257,010,080.30
g. Pekerjaan Batu 40 - 60 kg/unit m3 94.58 983,474.38 93,015,040.13
h. Pekerjaan Geotextile m2 339.74 42,820.40 14,547,871.21
SUB-TOTAL IV 817,489,599.11
RENCANA ANGGARAN BIAYA ( R A B )
DETAILED ENGINEERING DESIGN (DED)
PELABUHAN PENYEBERANGAN SERMATA - PROVINSI MALUKU BARAT DAYA

UNIT PRICE AMOUNT


NO DESCRIPTION UNIT VOLUME
Harga Satuan Jumlah Harga
No Uraian Satuan Volume (Rp.) (Rp.)
VI FASILITAS BANGUNAN DARAT
A TERMINAL & KANTOR PELABUHAN
1 Pekerjaan Tanah
a. Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 348.36 89,100.00 31,039,165.58
b. Pekerjaan urugan kembali (backfill) m3 328.49 44,000.00 14,453,659.00
c. Pekerjaan buangan sisa galian ke disposal m3 19.87 38,126.00 757,601.75
d. Timbunan Tanah, t=150mm m3 31.91 669,640.00 21,369,886.50
e. Timbunan Pasir, t=100mm m3 21.28 718,760.00 15,291,619.00
2 Pekerjaan Pondasi Batu Kali
a. Pondasi Batu kali m3 89.24 1,483,696.00 132,410,965.82
b. Aanstamping m3 19.83 937,397.60 18,590,469.20
c. Pasir Urug m3 4.96 792,960.00 3,931,495.68
3 Pekerjaan Beton K-175
a. Lantai kerja m3 3.73 1,567,919.13 5,849,906.27
4 Pekerjaan Beton Bertulang K-250 Insitu
4.1 Pondasi
a. Pekerjaan Beton K-250 m3 6.62 2,316,290.71 15,343,109.66
b. Pekerjaan Pembesian kg 794.88 18,982.90 15,089,127.55
c. Pekerjaan Bekisting m2 33.12 258,290.00 8,554,564.80
4.2 Sloof
a. Pekerjaan Beton K-250 m3 9.52 2,316,290.71 22,041,822.40
b. Pekerjaan Pembesian kg 1,189.50 18,982.90 22,580,159.55
c. Pekerjaan Bekisting m2 47.58 258,290.00 12,289,438.20
4.3 Kolom
a. Pekerjaan Beton K-250 m3 8.26 2,316,290.71 19,120,979.81
b. Pekerjaan Pembesian kg 1,155.70 18,982.90 21,938,537.53
c. Pekerjaan Bekisting m2 41.28 258,290.00 10,660,919.75
4.4 Balok
a. Pekerjaan Beton K-250 m3 3.18 2,316,290.71 7,358,855.59
b. Pekerjaan Pembesian kg 413.01 18,982.90 7,840,127.53
c. Pekerjaan Bekisting m2 15.89 258,290.00 4,102,936.65
4.5 Ring Balok
a. Pekerjaan Beton K-250 m3 8.06 2,316,290.71 18,669,303.12
b. Pekerjaan Pembesian kg 1,007.50 18,982.90 19,125,271.75
c. Pekerjaan Bekisting m2 40.30 258,290.00 10,409,087.00
4.6 Pelat Lantai
a. Pekerjaan Beton K-250 m3 14.40 2,316,290.71 33,354,586.22
b. Pekerjaan Pembesian kg 1,728.00 18,982.90 32,802,451.20
c. Pekerjaan Bekisting m2 72.00 258,290.00 18,596,880.00
5 Pekerjaan Rangka Atap Baja Ringan
5.1 Pemasangan Rangka Baja ringan m2 248.20 350,000.00 86,870,000.00
RENCANA ANGGARAN BIAYA ( R A B )
DETAILED ENGINEERING DESIGN (DED)
PELABUHAN PENYEBERANGAN SERMATA - PROVINSI MALUKU BARAT DAYA

UNIT PRICE AMOUNT


NO DESCRIPTION UNIT VOLUME
Harga Satuan Jumlah Harga
No Uraian Satuan Volume (Rp.) (Rp.)
6 Pekerjaan Arsitektur
6.1 Pekerjaan Dinding
a. Pekerjaan Dinding 1/2 Bata m2 381.63 120,000.00 45,795,000.00
b. Plesteran m2 763.25 50,000.00 38,162,500.00
c. Acian m2 763.25 25,000.00 19,081,250.00
6.2 Pekerjaan Lantai
a. Keramik 600x600mm m2 106.38 325,000.00 34,571,875.00
b. Keramik 400x400mm m2 13.63 300,000.00 4,087,500.00
c. Keramik non slip 600x600mm m2 247.20 350,000.00 86,520,000.00
6.3 Pekerjaan Plafon
a. Plafon Gypsum 9 mm m2 242.36 50,000.00 12,118,000.00
6.4 Pekerjaan Pintu dan Jendela
a. Pintu P1 (1700x2250mm) Kaca Double Swing unit 2.00 3,300,000.00 6,600,000.00
b. Pintu P2 (900x2250mm) Alumunium + Kaca unit 3.00 2,700,000.00 8,100,000.00
c. Pintu P3 (900x2250mm) Alumunium unit 3.00 2,600,000.00 7,800,000.00
d. Pintu P4 (800x2150mm) PVC unit 2.00 800,000.00 1,600,000.00
e. Jendela J1 (3700x2400mm) Alumunium unit 5.00 3,000,000.00 15,000,000.00
f. Jendela J2 (2100x2400mm) Alumunium unit 2.00 2,500,000.00 5,000,000.00
g. Jendela J3 (2025x2400mm) Alumunium unit 2.00 2,400,000.00 4,800,000.00
h. Jendela J4 (1775x2400mm) Alumunium unit 1.00 2,000,000.00 2,000,000.00
i. Jendela J5 (525x2400mm) Alumunium unit 4.00 1,500,000.00 6,000,000.00
j. Jendela J6 (775x450mm) Alumunium unit 2.00 600,000.00 1,200,000.00
6.5 Pekerjaan Finishing
a. Pengecatan Dinding Interior m2 361.20 45,000.00 16,254,000.00
b. Pengecatan Dinding Exterior m2 189.20 55,000.00 10,406,000.00
c. Pengecatan Plafond m2 242.36 40,000.00 9,694,400.00
6.6 Pekerjaan Penutup Atap
a. Pemasangan Atap Metal Zincalumn m2 248.20 180,000.00 44,676,000.00
b. Pemasangan Bubung Metal Zincalumn m' 10.00 200,000.00 2,000,000.00
SUB-TOTAL A 1,011,909,452.12
RENCANA ANGGARAN BIAYA ( R A B )
DETAILED ENGINEERING DESIGN (DED)
PELABUHAN PENYEBERANGAN SERMATA - PROVINSI MALUKU BARAT DAYA

UNIT PRICE AMOUNT


NO DESCRIPTION UNIT VOLUME
Harga Satuan Jumlah Harga
No Uraian Satuan Volume (Rp.) (Rp.)
B RUMAH POMPA
1 Pekerjaan Tanah
a. Penggalian Tanah untuk Konstruksi m3 24.20 89,100.00 2,156,220.00
b. Pengurugan Tanah Kembali untuk Konstruksi m3 21.14 44,000.00 930,160.00
c. Pekerjaan buangan sisa galian ke disposal m3 3.06 38,126.00 116,665.56
2 Pekerjaan Beton K-175
a. Lantai kerja m3 0.43 1,567,919.13 671,069.39
3 Pekerjaan Beton Bertulang K-250 Insitu
3.1 Pondasi
a. Pekerjaan Beton K-250 m3 1.51 2,316,290.71 3,502,231.55
b. Pekerjaan Pembesian kg 181.44 18,982.90 3,444,257.38
c. Pekerjaan Bekisting m2 3.02 258,290.00 781,068.96
3.2 Sloof
a. Pekerjaan Beton K-250 m3 1.12 2,316,290.71 2,594,245.60
b. Pekerjaan Pembesian kg 145.60 18,982.90 2,763,910.24
c. Pekerjaan Bekisting m2 2.24 258,290.00 578,569.60
3.3 Kolom
a. Pekerjaan Beton K-250 m3 1.48 2,316,290.71 3,418,845.09
b. Pekerjaan Pembesian kg 191.88 18,982.90 3,642,438.85
c. Pekerjaan Bekisting m2 2.95 258,290.00 762,472.08
3.4 Balok
a. Pekerjaan Beton K-250 m3 2.08 2,316,290.71 4,817,884.68
b. Pekerjaan Pembesian kg 249.60 18,982.90 4,738,131.84
c. Pekerjaan Bekisting m2 4.16 258,290.00 1,074,486.40
3.5 List Plank
a. Pekerjaan Beton K-250 m3 3.12 2,316,290.71 7,226,827.02
b. Pekerjaan Pembesian kg 280.80 18,982.90 5,330,398.32
c. Pekerjaan Bekisting m2 6.24 258,290.00 1,611,729.60
3.6 Atap Beton
a. Pekerjaan Beton K-250 m3 5.04 2,316,290.71 11,674,105.18
b. Pekerjaan Pembesian kg 453.60 18,982.90 8,610,643.44
c. Pekerjaan Bekisting m2 9.07 258,290.00 2,343,206.88
4 Pekerjaan Arsitektur
4.1 Pekerjaan Dinding
a. Pekerjaan Dinding 1/2 Bata m2 57.40 120,000.00 6,888,000.00
b. Plesteran m2 114.80 50,000.00 5,740,000.00
c. Acian m2 114.80 25,000.00 2,870,000.00
4.2 Pekerjaan Pintu dan Jendela
a. Pintu Baja (2150x2250mm) unit 1.00 5,000,000.00 5,000,000.00
b. Ventilasi Jalusi (1500x1500mm) unit 1.00 500,000.00 500,000.00
4.3 Pekerjaan Finishing
a. Pengecatan Dinding Interior m2 58.80 45,000.00 2,646,000.00
b. Pengecatan Dinding Exterior m2 58.80 55,000.00 3,234,000.00
SUB-TOTAL B 99,667,567.64
RENCANA ANGGARAN BIAYA ( R A B )
DETAILED ENGINEERING DESIGN (DED)
PELABUHAN PENYEBERANGAN SERMATA - PROVINSI MALUKU BARAT DAYA

UNIT PRICE AMOUNT


NO DESCRIPTION UNIT VOLUME
Harga Satuan Jumlah Harga
No Uraian Satuan Volume (Rp.) (Rp.)
C RUMAH GENSET
1 Pekerjaan Tanah
a. Penggalian Tanah untuk Konstruksi m3 43.56 89,100.00 3,881,196.00
b. Pengurugan Tanah Kembali untuk Konstruksi m3 38.56 44,000.00 1,696,640.00
c. Pekerjaan buangan sisa galian ke disposal m3 5.00 38,126.00 190,630.00
2 Pekerjaan Beton K-175
a. Lantai kerja m3 0.49 1,567,919.13 765,144.54
3 Pekerjaan Beton Bertulang K-250 Insitu
3.1 Pondasi
a. Pekerjaan Beton K-250 m3 2.59 2,316,290.71 6,003,825.52
b. Pekerjaan Pembesian kg 362.88 18,982.90 6,888,514.75
c. Pekerjaan Bekisting m2 5.18 258,290.00 1,338,975.36
3.2 Sloof
a. Pekerjaan Beton K-250 m3 1.92 2,316,290.71 4,447,278.16
b. Pekerjaan Pembesian kg 268.80 18,982.90 5,102,603.52
c. Pekerjaan Bekisting m2 3.84 258,290.00 991,833.60
3.3 Kolom
a. Pekerjaan Beton K-250 m3 1.51 2,316,290.71 3,502,231.55
b. Pekerjaan Pembesian kg 211.68 18,982.90 4,018,300.27
c. Pekerjaan Bekisting m2 3.02 258,290.00 781,068.96
3.4 Balok
a. Pekerjaan Beton K-250 m3 5.85 2,316,290.71 13,550,300.65
b. Pekerjaan Pembesian kg 760.50 18,982.90 14,436,495.45
c. Pekerjaan Bekisting m2 11.70 258,290.00 3,021,993.00
3.5 List Plank
a. Pekerjaan Beton K-250 m3 5.12 2,316,290.71 11,859,408.44
b. Pekerjaan Pembesian kg 563.20 18,982.90 10,691,169.28
c. Pekerjaan Bekisting m2 10.24 258,290.00 2,644,889.60
3.6 Atap Beton
a. Pekerjaan Beton K-250 m3 9.45 2,316,290.71 21,888,947.21
b. Pekerjaan Pembesian kg 1,039.50 18,982.90 19,732,724.55
c. Pekerjaan Bekisting m2 18.90 258,290.00 4,881,681.00
4 Pekerjaan Arsitektur
4.1 Pekerjaan Dinding
a. Pekerjaan Dinding 1/2 Bata m2 100.80 120,000.00 12,096,000.00
b. Plesteran m2 201.60 50,000.00 10,080,000.00
c. Acian m2 201.60 25,000.00 5,040,000.00
4.2 Pekerjaan Pintu dan Jendela
a. Pintu Baja (2150x2250mm) unit 2.00 5,000,000.00 10,000,000.00
b. Ventilasi Jalusi (1500x1500mm) unit 2.00 500,000.00 1,000,000.00
4.3 Pekerjaan Finishing
a. Pengecatan Dinding Interior m2 100.80 45,000.00 4,536,000.00
b. Pengecatan Dinding Exterior m2 84.00 55,000.00 4,620,000.00
SUB-TOTAL C 189,687,851.41
RENCANA ANGGARAN BIAYA ( R A B )
DETAILED ENGINEERING DESIGN (DED)
PELABUHAN PENYEBERANGAN SERMATA - PROVINSI MALUKU BARAT DAYA

UNIT PRICE AMOUNT


NO DESCRIPTION UNIT VOLUME
Harga Satuan Jumlah Harga
No Uraian Satuan Volume (Rp.) (Rp.)
D POS SECURITY
1 Pekerjaan Tanah
a. Penggalian Tanah untuk Konstruksi m3 24.20 89,100.00 2,156,220.00
b. Pengurugan Tanah Kembali untuk Konstruksi m3 21.04 44,000.00 925,540.00
c. Pekerjaan buangan sisa galian ke disposal m3 3.17 38,126.00 120,668.79
2 Pekerjaan Beton K-175
a. Lantai kerja m3 0.48 1,567,919.13 757,304.94
3 Pekerjaan Beton Bertulang K-250 Insitu
3.1 Pondasi
a. Pekerjaan Beton K-250 m3 1.51 2,316,290.71 3,502,231.55
b. Pekerjaan Pembesian kg 181.44 18,982.90 3,444,257.38
c. Pekerjaan Bekisting m2 3.02 258,290.00 781,068.96
3.2 Sloof
a. Pekerjaan Beton K-250 m3 1.17 2,316,290.71 2,710,060.13
b. Pekerjaan Pembesian kg 152.10 18,982.90 2,887,299.09
c. Pekerjaan Bekisting m2 2.34 258,290.00 604,398.60
3.3 Kolom
a. Pekerjaan Beton K-250 m3 5.85 2,316,290.71 13,545,668.07
b. Pekerjaan Pembesian kg 760.24 18,982.90 14,431,559.90
c. Pekerjaan Bekisting m2 11.70 258,290.00 3,020,959.84
3.4 Balok
a. Pekerjaan Beton K-250 m3 1.17 2,316,290.71 2,710,060.13
b. Pekerjaan Pembesian kg 140.40 18,982.90 2,665,199.16
c. Pekerjaan Bekisting m2 2.34 258,290.00 604,398.60
3.5 Dak Atap
a. Pekerjaan Beton K-250 m3 3.00 2,316,290.71 6,948,872.13
b. Pekerjaan Pembesian kg 270.00 18,982.90 5,125,383.00
c. Pekerjaan Bekisting m2 5.40 258,290.00 1,394,766.00
4 Pekerjaan Arsitektur
4.1 Pekerjaan Dinding
a. Pekerjaan Dinding 1/2 Bata m2 64.35 120,000.00 7,722,000.00
b. Plesteran m2 128.70 50,000.00 6,435,000.00
c. Acian m2 128.70 25,000.00 3,217,500.00
4.2 Pekerjaan Lantai
a. Keramik 600x600mm m2 12.25 325,000.00 3,981,250.00
4.3 Pekerjaan Pintu dan Jendela
a. Pintu P1 (1000x2150mm) Alumunium unit 1.00 2,500,000.00 2,500,000.00
b. Pintu P2 (800x2150mm) PVC unit 1.00 800,000.00 800,000.00
c. Jendela J1 (1350x2150mm) Alumunium unit 1.00 900,000.00 900,000.00
d. Jendela J2 (500x800mm) Alumunium unit 1.00 300,000.00 300,000.00
4.4 Pekerjaan Finishing
a. Pengecatan Dinding Interior m2 82.50 45,000.00 3,712,500.00
b. Pengecatan Dinding Exterior m2 46.20 55,000.00 2,541,000.00
SUB-TOTAL D 100,445,166.27
RENCANA ANGGARAN BIAYA ( R A B )
DETAILED ENGINEERING DESIGN (DED)
PELABUHAN PENYEBERANGAN SERMATA - PROVINSI MALUKU BARAT DAYA

UNIT PRICE AMOUNT


NO DESCRIPTION UNIT VOLUME
Harga Satuan Jumlah Harga
No Uraian Satuan Volume (Rp.) (Rp.)
E GATE DAN PORTAL PELABUHAN
1 Pekerjaan Tanah
a. Penggalian Tanah untuk Konstruksi m3 29.40 89,100.00 2,619,540.00
b. Pengurugan Tanah Kembali untuk Konstruksi m3 25.26 44,000.00 1,111,440.00
c. Pekerjaan buangan sisa galian ke disposal m3 4.14 38,126.00 157,841.64
2 Pekerjaan Beton K-175
a. Lantai kerja m3 0.55 1,567,919.13 859,219.68
3 Pekerjaan Beton Bertulang K-250 Insitu
3.1 Pondasi
a. Pekerjaan Beton K-250 m3 1.51 2,316,290.71 3,502,231.55
b. Pekerjaan Pembesian kg 151.20 18,982.90 2,870,214.48
c. Pekerjaan Bekisting m2 3.02 258,290.00 781,068.96
3.2 Sloof
a. Pekerjaan Beton K-250 m3 2.08 2,316,290.71 4,817,884.68
b. Pekerjaan Pembesian kg 291.20 18,982.90 5,527,820.48
c. Pekerjaan Bekisting m2 4.16 258,290.00 1,074,486.40
3.3 Kolom
a. Pekerjaan Beton K-250 m3 1.40 2,316,290.71 3,252,072.16
b. Pekerjaan Pembesian kg 210.60 18,982.90 3,997,798.74
c. Pekerjaan Bekisting m2 2.81 258,290.00 725,278.32
3.4 Balok
a. Pekerjaan Beton K-250 m3 1.17 2,316,290.71 2,710,060.13
b. Pekerjaan Pembesian kg 163.80 18,982.90 3,109,399.02
c. Pekerjaan Bekisting m2 2.34 258,290.00 604,398.60
3.5 Ring Balok
a. Pekerjaan Beton K-250 m3 2.08 2,316,290.71 4,817,884.68
b. Pekerjaan Pembesian kg 291.20 18,982.90 5,527,820.48
c. Pekerjaan Bekisting m2 4.16 258,290.00 1,074,486.40
3.6 Pelat Lantai
a. Pekerjaan Beton K-250 m3 2.52 2,316,290.71 5,837,052.59
b. Pekerjaan Pembesian kg 428.40 18,982.90 8,132,274.36
c. Pekerjaan Bekisting m2 4.54 258,290.00 1,171,603.44
4 Pekerjaan Arsitektur
4.1 Pekerjaan Dinding
a. Pekerjaan Dinding 1/2 Bata m2 101.40 120,000.00 12,168,000.00
b. Plesteran m2 202.80 50,000.00 10,140,000.00
c. Acian m2 202.80 25,000.00 5,070,000.00
4.2 Pekerjaan Lantai
a. Keramik 600x600mm m2 21.00 325,000.00 6,825,000.00
4.3 Pekerjaan Plafon
a. Plafon Gypsum 9 mm m2 21.00 50,000.00 1,050,000.00
4.4 Pekerjaan Pintu dan Jendela
a. Pintu P1 (900x2150mm) Alumunium unit 1.00 2,700,000.00 2,700,000.00
b. Pintu P2 (800x2150mm) Alumunium unit 1.00 2,600,000.00 2,600,000.00
c. Pintu P3 (800x2150mm) PVC unit 1.00 800,000.00 800,000.00
d. Jendela J1 (1000x300mm) Alumunium unit 1.00 500,000.00 500,000.00
e. Jendela J2 (1700x1350mm) Alumunium unit 2.00 1,000,000.00 2,000,000.00
f. Jendela J3 (1350x1350mm) Alumunium unit 1.00 800,000.00 800,000.00
g. Jendela J4 (2700x1350mm) Alumunium unit 2.00 2,000,000.00 4,000,000.00
4.5 Pekerjaan Finishing
a. Pengecatan Dinding Interior m2 124.80 45,000.00 5,616,000.00
b. Pengecatan Dinding Exterior m2 78.00 55,000.00 4,290,000.00
c. Pengecatan Plafond m2 21.00 40,000.00 840,000.00
4.6 Pekerjaan Penutup Atap
a. Pemasangan Atap Metal Zincalumn m2 57.60 180,000.00 10,368,000.00
b. Pemasangan Bubung Metal Zincalumn m' 4.00 200,000.00 800,000.00
5 Pekerjaan Portal Gate
5.1 Portal Gate unit 1.00 20,000,000.00 20,000,000.00
SUB-TOTAL E 154,848,876.79
RENCANA ANGGARAN BIAYA ( R A B )
DETAILED ENGINEERING DESIGN (DED)
PELABUHAN PENYEBERANGAN SERMATA - PROVINSI MALUKU BARAT DAYA

UNIT PRICE AMOUNT


NO DESCRIPTION UNIT VOLUME
Harga Satuan Jumlah Harga
No Uraian Satuan Volume (Rp.) (Rp.)
F KANTIN DAN TOILET UMUM
1 Pekerjaan Tanah
a. Penggalian Tanah untuk Konstruksi m3 106.20 89,100.00 9,462,420.00
b. Pengurugan Tanah Kembali untuk Konstruksi m3 102.56 44,000.00 4,512,816.00
c. Pekerjaan buangan sisa galian ke disposal m3 3.64 38,126.00 138,626.14
2 Pekerjaan Pondasi Batu Kali
a. Pondasi Batu kali m3 19.44 1,483,696.00 28,843,050.24
b. Aanstamping m3 4.32 937,397.60 4,049,557.63
c. Pasir Urug m3 1.08 792,960.00 856,396.80
3 Pekerjaan Beton K-175
a. Lantai kerja m3 1.24 1,567,919.13 1,937,948.04
4 Pekerjaan Beton Bertulang K-250 Insitu
4.1 Sloof
a. Pekerjaan Beton K-250 m3 2.40 2,316,290.71 5,559,097.70
b. Pekerjaan Pembesian kg 312.00 18,982.90 5,922,664.80
c. Pekerjaan Bekisting m2 4.80 258,290.00 1,239,792.00
4.2 Kolom
a. Pekerjaan Beton K-250 m3 3.86 2,316,290.71 8,943,198.43
b. Pekerjaan Pembesian kg 501.93 18,982.90 9,528,087.00
c. Pekerjaan Bekisting m2 7.72 258,290.00 1,994,515.38
4.3 Balok
a. Pekerjaan Beton K-250 m3 1.35 2,316,290.71 3,126,992.46
b. Pekerjaan Pembesian kg 189.00 18,982.90 3,587,768.10
c. Pekerjaan Bekisting m2 2.70 258,290.00 697,383.00
4.4 Pelat Lantai
a. Pekerjaan Beton K-250 m3 2.88 2,316,290.71 6,670,917.24
b. Pekerjaan Pembesian kg 489.60 18,982.90 9,294,027.84
c. Pekerjaan Bekisting m2 5.18 258,290.00 1,338,975.36
5 Pekerjaan Rangka Atap Baja Ringan
5.1 Pemasangan Rangka Baja ringan m2 50.12 350,000.00 17,542,875.00
6 Pekerjaan Arsitektur
6.1 Pekerjaan Dinding
a. Pekerjaan Dinding 1/2 Bata m2 99.00 120,000.00 11,880,000.00
b. Plesteran m2 198.00 50,000.00 9,900,000.00
c. Acian m2 198.00 25,000.00 4,950,000.00
6.2 Pekerjaan Lantai
a. Keramik 600x600mm m2 12.00 325,000.00 3,900,000.00
b. Keramik non slip 600x600mm m2 12.00 350,000.00 4,200,000.00
6.3 Pekerjaan Plafon
a. Plafon Gypsum 9 mm m2 43.50 50,000.00 2,175,000.00
6.4 Pekerjaan Pintu dan Jendela
a. Pintu P1 unit 4.00 2,500,000.00 10,000,000.00
b. Jendela J1 unit 2.00 1,200,000.00 2,400,000.00
c. Jendela J2 unit 2.00 1,100,000.00 2,200,000.00
6.5 Pekerjaan Finishing
a. Pengecatan Dinding Interior m2 132.00 45,000.00 5,940,000.00
b. Pengecatan Dinding Exterior m2 66.00 55,000.00 3,630,000.00
c. Pengecatan Plafond m2 43.50 40,000.00 1,740,000.00
6.6 Pekerjaan Penutup Atap
a. Pemasangan Atap Metal Zincalumn m2 50.12 180,000.00 9,022,050.00
b. Pemasangan Bubung Metal Zincalumn m' 3.00 200,000.00 600,000.00
SUB-TOTAL F 197,784,159.17
RENCANA ANGGARAN BIAYA ( R A B )
DETAILED ENGINEERING DESIGN (DED)
PELABUHAN PENYEBERANGAN SERMATA - PROVINSI MALUKU BARAT DAYA

UNIT PRICE AMOUNT


NO DESCRIPTION UNIT VOLUME
Harga Satuan Jumlah Harga
No Uraian Satuan Volume (Rp.) (Rp.)
G GANGWAY, PAGAR BRC DAN PINTU GERBANG
1 Pekerjaan Tanah
a. Penggalian Tanah untuk Konstruksi m3 68.45 89,100.00 6,099,287.04
b. Pengurugan Tanah Kembali untuk Konstruksi m3 55.21 44,000.00 2,429,455.60
c. Pekerjaan buangan sisa galian ke disposal m3 13.24 38,126.00 504,769.18
2 Pekerjaan Beton K-175
a. Lantai kerja m3 2.02 1,567,919.13 3,160,924.97
3 Pekerjaan Beton Bertulang K-250 Insitu
3.1 Pondasi
a. Pekerjaan Beton K-250 m3 6.63 2,316,290.71 15,356,428.33
b. Pekerjaan Pembesian kg 662.98 18,982.90 12,585,188.13
c. Pekerjaan Bekisting m2 13.26 258,290.00 3,424,796.26
3.2 Sloof
a. Pekerjaan Beton K-250 m3 4.59 2,316,290.71 10,640,460.45
b. Pekerjaan Pembesian kg 643.13 18,982.90 12,208,377.56
c. Pekerjaan Bekisting m2 9.19 258,290.00 2,373,039.38
4 Pekerjaan Baja
4.1 Kolom
a. WF. 100.100.6.8 kg 6,130.08 31,715.34 194,417,588.94
4.2 Balok
a. WF. 100.100.6.8 kg 8,359.20 31,715.34 265,114,894.01
4.3 Rafter
a. WF. 100.100.6.8 kg 2,786.40 31,715.34 88,371,631.34
4.4 Joint Plate kg 1,727.57 31,715.34 54,790,411.43
5 Pekerjaan Arsitektur
5.1 Pekerjaan Atap
a. Pemasangan Atap Fiber m2 727.80 60,000.00 43,668,000.00
b. Pemasangan Nok m' 242.60 120,000.00 29,112,000.00
5.2 Pekerjaan Jalusi
a. Jalusi Alumunium unit 162.00 300,000.00 48,600,000.00
6 Pekerjaan Pemasangan Pintu Gerbang dan Pagar BRC
a. Pemasangan Pintu Gerbang Unit 2.00 15,000,000.00 30,000,000.00
b. Pemasangan Pagar BRC m' 320.00 300,000.00 96,000,000.00
SUB-TOTAL G 918,857,252.61
RENCANA ANGGARAN BIAYA ( R A B )
DETAILED ENGINEERING DESIGN (DED)
PELABUHAN PENYEBERANGAN SERMATA - PROVINSI MALUKU BARAT DAYA

UNIT PRICE AMOUNT


NO DESCRIPTION UNIT VOLUME
Harga Satuan Jumlah Harga
No Uraian Satuan Volume (Rp.) (Rp.)
H TOWER AIR
1 Pekerjaan Tanah
a. Penggalian Tanah untuk Konstruksi m3 20.06 89,100.00 1,787,346.00
b. Pengurugan Tanah Kembali untuk Konstruksi m3 16.94 44,000.00 745,448.00
c. Pekerjaan buangan sisa galian ke disposal m3 3.12 38,126.00 118,876.87
2 Pekerjaan Beton K-175
a. Lantai kerja m3 0.47 1,567,919.13 743,193.67
3 Pekerjaan Beton Bertulang K-250 Insitu
3.1 Pondasi
a. Pekerjaan Beton K-250 m3 1.25 2,316,290.71 2,899,995.97
b. Pekerjaan Pembesian kg 125.20 18,982.90 2,376,659.08
c. Pekerjaan Bekisting m2 2.50 258,290.00 646,758.16
3.2 Sloof
a. Pekerjaan Beton K-250 m3 1.39 2,316,290.71 3,224,276.67
b. Pekerjaan Pembesian kg 139.20 18,982.90 2,642,419.68
c. Pekerjaan Bekisting m2 2.78 258,290.00 719,079.36
4 Pekerjaan Baja
4.1 Pipa Besi Ø2 " kg 247.23 31,715.34 7,841,098.39
4.2 Pipa Besi Ø1 " kg 66.58 31,715.34 2,111,670.96
4.3 L.50.50.6 kg 825.73 31,715.34 26,188,445.80
4.4 2L.50.50.6 kg 37.21 31,715.34 1,180,191.34
4.5 2L.90.90.7 kg 886.12 31,715.34 28,103,472.75
4.6 L.40.40.4 kg 69.47 31,715.34 2,203,371.43
4.7 Bracing L.40.40.4 kg 78.83 31,715.34 2,500,244.80
4.8 Bracing L.65.65.6 kg 190.77 31,715.34 6,050,488.19
4.9 Bracing L.50.50.6 kg 271.61 31,715.34 8,614,272.78
4.10 Bracing 2L.50.50.6 kg 222.99 31,715.34 7,072,156.10
4.11 Expended Mesh m2 18.14 1,902,920.57 34,518,979.17
SUB-TOTAL H 142,288,445.15
I LAMPU PJU
1 Pekerjaan Beton Bertulang K-250 Insitu
1.1 Pondasi Tiang Lampu PJU
a. Pekerjaan Beton K-250 m3 6.16 2,316,290.71 14,268,350.77
b. Pekerjaan Pembesian kg 876.75 18,982.90 16,643,325.11
c. Pekerjaan Bekisting m2 12.32 258,290.00 3,182,132.80
2 Pekerjaan Pemasangan Lampu PJU
a. Lampu PJU Tunggal nos 19.00 20,000,000.00 380,000,000.00
b. Lampu PJU Ganda nos 3.00 25,000,000.00 75,000,000.00
SUB-TOTAL I 489,093,808.68
RENCANA ANGGARAN BIAYA ( R A B )
DETAILED ENGINEERING DESIGN (DED)
PELABUHAN PENYEBERANGAN SERMATA - PROVINSI MALUKU BARAT DAYA

UNIT PRICE AMOUNT


NO DESCRIPTION UNIT VOLUME
Harga Satuan Jumlah Harga
No Uraian Satuan Volume (Rp.) (Rp.)
J GAPURA
1 Pekerjaan Tanah
a. Penggalian Tanah untuk Konstruksi m3 23.06 89,100.00 2,054,353.88
b. Pengurugan Tanah Kembali untuk Konstruksi m3 17.90 44,000.00 787,572.72
c. Pekerjaan buangan sisa galian ke disposal m3 5.16 38,126.00 196,628.80
2 Pekerjaan Beton K-175 Insitu
2.1 Lean Concrete
a. Pekerjaan Beton K-175 m3 0.75 1,567,919.13 1,179,075.19
3 Pekerjaan Beton Bertulang K-250 Insitu
3.1 Pondasi
a. Pekerjaan Beton K-250 m3 3.46 2,316,290.71 8,005,100.69
b. Pekerjaan Pembesian kg 678.32 18,982.90 12,876,478.82
c. Pekerjaan Bekisting m2 6.91 258,290.00 1,785,300.48
3.2 Sloof
a. Pekerjaan Beton K-250 m3 1.41 2,316,290.71 3,261,337.32
b. Pekerjaan Pembesian kg 194.28 18,982.90 3,688,048.46
c. Pekerjaan Bekisting m2 2.82 258,290.00 727,344.64
3.3 Kolom & Pedestal
a. Pekerjaan Beton K-250 m3 5.54 2,316,290.71 12,841,515.70
b. Pekerjaan Pembesian kg 667.33 18,982.90 12,667,854.22
c. Pekerjaan Bekisting m2 11.09 258,290.00 2,863,919.52
3.4 Balok
a. Pekerjaan Beton K-250 m3 12.34 2,316,290.71 28,572,604.05
b. Pekerjaan Pembesian kg 1,844.05 18,982.90 35,005,368.45
c. Pekerjaan Bekisting m2 24.67 258,290.00 6,372,272.59
4 Pekerjaan Pengecatan
4.1 Pek. Cat Beton Eksterior Pure White m2 45.60 75,000.00 3,420,000.00
4.2 Pek. Cat Beton Eksterior Kolom dan Ring Balok m2 203.68 75,000.00 15,275,812.50
4.3 Pek. Cat Akrilik Panel GRC m2 130.52 150,000.00 19,577,400.00
4.4 Pek. Cat Besi m2 0.84 165,000.00 137,964.89
5 Pekerjaan Atap & Aksesoris
5.1 - Panel Fiber Semen (GRC) t=8 cm + Angkur dan Viser m3 5.22 450,000.00 2,349,288.00
5.2 - Roundbar GRC Panel Support Ø16 kg 26.27 5,500,000.00 144,497,320.00
5.3 - Panel Nama Pelabuhan ACP + Angkur dan Rangka m2 1.95 5,000,000.00 9,765,000.00
6 Pekerjaan Elektrikal dan Panel Lampu Sorot Gapura
a. Pekerjaan Elektrikal dan Panel Lampu Sorot Gapura ls 1.00 12,000,000.00 12,000,000.00
SUB-TOTAL J 339,907,560.92
K LANSEKAP
1 Pemasangan Rumput m2 3,575.00 50,000.00 178,750,000.00
2 Penanaman Pohon phn 50.00 600,000.00 30,000,000.00
SUB-TOTAL K 208,750,000.00
L MARKA JALAN
1 Pengecatan Marka m2 723.22 80,000.00 57,857,251.20
SUB-TOTAL L 57,857,251.20
SUB-TOTAL VI 3,911,097,391.96
RENCANA ANGGARAN BIAYA ( R A B )
DETAILED ENGINEERING DESIGN (DED)
PELABUHAN PENYEBERANGAN SERMATA - PROVINSI MALUKU BARAT DAYA

UNIT PRICE AMOUNT


NO DESCRIPTION UNIT VOLUME
Harga Satuan Jumlah Harga
No Uraian Satuan Volume (Rp.) (Rp.)
VII PEKERJAAN FASILITAS PERAIRAN
A PEKERJAAN ABUTMENT
1 Pekerjaan Tiang Pancang
1.1 Pengadaan SPP Ø508 t=12mm L=40m ton 17.61 13,037,407.64 229,643,915.35
1.2 Transport ke Lokasi & Positioning m' 120.00 115,623.89 13,874,866.80
1.3 Pemancangan m' 120.00 900,760.31 108,091,237.20
1.4 Penyambungan Tiang titik 3.00 887,750.00 2,663,250.00
1.5 Pemotongan Tiang titik 3.00 738,762.17 2,216,286.51
1.6 Proteksi Tiang Pancang Baja
- Selimut Tiang HDPE m2 22.98 2,695,000.00 61,934,815.27
1.7 Cover Plate, t=8mm kg 34.66 27,812.70 964,061.31
2 Pekerjaan Beton Bertulang K-350 Insitu
2.1 Pengisi Tiang Pancang SPP Ø508
a. Pekerjaan Beton K-350 m3 0.55 2,600,241.58 1,435,210.35
b. Pekerjaan Pembesian kg 346.56 18,982.90 6,578,777.82
2.2 Abutment
a. Pekerjaan Beton K-350 m3 17.76 2,600,241.58 46,180,290.46
b. Pekerjaan Pembesian kg 1,670.95 18,982.90 31,719,527.15
c. Pekerjaan Bekisting m2 36.40 258,290.00 9,401,239.42
2.3 Wing Wall
a. Pekerjaan Beton K-350 m3 5.05 2,600,241.58 13,123,939.30
b. Pekerjaan Pembesian kg 571.09 18,982.90 10,841,008.12
c. Pekerjaan Bekisting m2 18.41 258,290.00 4,756,152.06
2.4 Pelat Injak
a. Pekerjaan Beton K-350 m3 4.38 2,600,241.58 11,392,958.48
b. Pekerjaan Pembesian kg 321.18 18,982.90 6,096,885.00
c. Pekerjaan Bekisting m2 4.94 258,290.00 1,274,919.44
3 Kelengkapan Dermaga
3.1 Dilatasi
a. CNP.150.75.6,5.8 kg 260.40 31,715.34 8,258,675.28
b. Embedded Bar Ø19-500 kg 43.62 18,982.90 828,104.93
SUB-TOTAL A 571,276,120.26
RENCANA ANGGARAN BIAYA ( R A B )
DETAILED ENGINEERING DESIGN (DED)
PELABUHAN PENYEBERANGAN SERMATA - PROVINSI MALUKU BARAT DAYA

UNIT PRICE AMOUNT


NO DESCRIPTION UNIT VOLUME
Harga Satuan Jumlah Harga
No Uraian Satuan Volume (Rp.) (Rp.)
B PEKERJAAN TRESTLE
1 Pekerjaan Tiang Pancang
1.1 Pengadaan SPP Ø508 t=12mm L=40m ton 457.97 13,037,407.64 5,970,741,799.06
1.2 Transport ke Lokasi & Positioning m' 3,120.00 115,623.89 360,746,536.80
1.3 Pemancangan m' 3,120.00 900,760.31 2,810,372,167.20
1.4 Penyambungan Tiang titik 78.00 887,750.00 69,244,500.00
1.5 Pemotongan Tiang titik 78.00 738,762.17 57,623,449.26
1.6 Proteksi Tiang Pancang Baja
- Selimut Tiang HDPE m2 597.52 2,695,000.00 1,610,305,197.07
1.7 Cover Plate, t=8mm kg 901.23 27,812.70 25,065,594.09
1.8 Tes PDA titik 4.00 18,890,800.00 75,563,200.00
2 Pekerjaan Beton Bertulang K-350 Insitu
2.1 Pengisi Tiang Pancang SPP Ø508
a. Pekerjaan Beton K-350 m3 14.35 2,600,241.58 37,315,469.14
b. Pekerjaan Pembesian kg 9,010.65 18,982.90 171,048,223.40
2.2 Pile Cap
a. Pekerjaan Beton K-350 m3 134.78 2,600,241.58 350,470,961.12
b. Pekerjaan Pembesian kg 19,539.75 18,982.90 370,921,088.61
c. Pekerjaan Bekisting m2 299.52 258,290.00 77,363,020.80
2.3 Balok Melintang B.2 (50/90)
a. Pekerjaan Beton K-350 m3 66.79 2,600,241.58 173,663,634.52
b. Pekerjaan Pembesian kg 9,115.94 18,982.90 173,046,932.06
c. Pekerjaan Bekisting m2 209.06 258,290.00 53,998,470.80
2.4 Balok Melintang B.3 (40/70)
a. Pekerjaan Beton K-350 m3 56.28 2,600,241.58 146,341,596.12
b. Pekerjaan Pembesian kg 7,877.60 18,982.90 149,539,641.91
c. Pekerjaan Bekisting m2 265.05 258,290.00 68,460,281.08
2.5 Balok Memanjang B.1 (50/90)
a. Pekerjaan Beton K-350 m3 171.78 2,600,241.58 446,671,448.79
b. Pekerjaan Pembesian kg 29,683.22 18,982.90 563,473,669.72
c. Pekerjaan Bekisting m2 547.14 258,290.00 141,320,016.65
2.6 Pelat Lantai
a. Pekerjaan Beton K-350 m3 296.63 2,600,241.58 771,322,336.05
b. Pekerjaan Pembesian kg 37,863.27 18,982.90 718,754,601.10
c. Pekerjaan Bekisting m2 318.77 258,290.00 82,335,402.84
2.7 Kanstin
a. Pekerjaan Beton K-350 m3 25.38 2,600,241.58 66,005,004.21
b. Pekerjaan Pembesian kg 3,892.43 18,982.90 73,889,635.42
c. Pekerjaan Bekisting m2 116.52 258,290.00 30,096,840.68
2.8 Guard Rail/Dudukan Rail
a. Pekerjaan Beton K-350 m3 8.00 2,600,241.58 20,801,932.64
b. Pekerjaan Pembesian kg 897.76 18,982.90 17,042,042.78
c. Pekerjaan Bekisting m2 24.08 258,290.00 6,219,623.20
2.9 Pondasi Tiang Lampu
a. Pekerjaan Beton K-350 m3 0.56 2,600,241.58 1,456,135.28
b. Pekerjaan Pembesian kg 37.74 18,982.90 716,359.12
c. Pekerjaan Bekisting m2 9.33 258,290.00 2,410,706.67
3 Kelengkapan Dermaga
3.1 Railing
a. Railing Pipe 1/2" GSP kg 1,148.48 31,715.34 36,424,589.99
b. Tiang Lampu titik 2.00 25,000,000.00 50,000,000.00
4 Pekerjaan Perkerasan Jalan
4.1 Pekerasan Jalan
a. Aston Lapen Macadam t= 5-7 cm m2 1,272.41 375,876.22 478,268,943.00
b. Beton Tumbuk t=50 mm m3 18.01 1,503,903.08 27,078,996.88
c. Pasir t=100 mm m3 36.01 753,052.02 27,118,627.02
SUB-TOTAL B 16,313,238,675.08
RENCANA ANGGARAN BIAYA ( R A B )
DETAILED ENGINEERING DESIGN (DED)
PELABUHAN PENYEBERANGAN SERMATA - PROVINSI MALUKU BARAT DAYA

UNIT PRICE AMOUNT


NO DESCRIPTION UNIT VOLUME
Harga Satuan Jumlah Harga
No Uraian Satuan Volume (Rp.) (Rp.)
C PEKERJAAN PLENGSENGAN
1 Pekerjaan Tiang Pancang
1.1 Pengadaan SPP Ø508 t=12mm L=40m ton 82.20 13,037,407.64 1,071,671,604.96
1.2 Transport ke Lokasi & Positioning m' 560.00 115,623.89 64,749,378.40
1.3 Pemancangan m' 560.00 900,760.31 504,425,773.60
1.4 Penyambungan Tiang titik 14.00 887,750.00 12,428,500.00
1.5 Pemotongan Tiang titik 14.00 738,762.17 10,342,670.38
1.6 Proteksi Tiang Pancang Baja
- Selimut Tiang HDPE m2 22.98 2,695,000.00 61,934,815.27
1.7 Cover Plate, t=8mm kg 161.76 27,812.70 4,498,952.78
1.8 Tes PDA titik 1.00 18,890,800.00 18,890,800.00
2 Pekerjaan Beton Bertulang K-350 Insitu
2.1 Pengisi Tiang Pancang SPP Ø508
a. Pekerjaan Beton K-350 m3 2.58 2,600,241.58 6,697,648.31
b. Pekerjaan Pembesian kg 1,617.30 18,982.90 30,700,963.17
2.2 Pile Cap PC.1
a. Pekerjaan Beton K-350 m3 16.14 2,600,241.58 41,978,300.07
b. Pekerjaan Pembesian kg 1,614.03 18,982.90 30,638,916.82
c. Pekerjaan Bekisting m2 49.96 258,290.00 12,905,201.56
2.3 Pile Cap PC.2
a. Pekerjaan Beton K-350 m3 12.05 2,600,241.58 31,343,312.01
b. Pekerjaan Pembesian kg 1,766.14 18,982.90 33,526,460.70
c. Pekerjaan Bekisting m2 24.97 258,290.00 6,448,881.40
2.4 Pile Cap PC.3
a. Pekerjaan Beton K-350 m3 7.56 2,600,241.58 19,670,307.50
b. Pekerjaan Pembesian kg 920.25 18,982.90 17,469,075.23
c. Pekerjaan Bekisting m2 29.06 258,290.00 7,505,483.63
2.5 Balok Melintang, B.2 (50/90)
a. Pekerjaan Beton K-350 m3 5.13 2,600,241.58 13,339,239.31
b. Pekerjaan Pembesian kg 700.20 18,982.90 13,291,869.91
c. Pekerjaan Bekisting m2 30.75 258,290.00 7,942,616.18
2.6 Balok Melintang, B.3 (40/70)
a. Pekerjaan Beton K-350 m3 5.46 2,600,241.58 14,197,319.03
b. Pekerjaan Pembesian kg 764.24 18,982.90 14,507,577.20
c. Pekerjaan Bekisting m2 25.77 258,290.00 6,655,100.14
2.7 Balok Memanjang, B.1 (50/90)
a. Pekerjaan Beton K-350 m3 19.44 2,600,241.58 50,548,696.32
b. Pekerjaan Pembesian kg 3,359.18 18,982.90 63,766,912.99
c. Pekerjaan Bekisting m2 35.82 258,290.00 9,251,947.80
2.8 Pelat Lantai
a. Pekerjaan Beton K-350 m3 21.59 2,600,241.58 56,126,214.50
b. Pekerjaan Pembesian kg 2,755.17 18,982.90 52,301,058.88
c. Pekerjaan Bekisting m2 31.35 258,290.00 8,098,012.92
2.9 Kanstin
a. Pekerjaan Beton K-350 m3 0.48 2,600,241.58 1,248,115.96
b. Pekerjaan Pembesian kg 73.60 18,982.90 1,397,209.72
c. Pekerjaan Bekisting m2 3.14 258,290.00 811,030.60
3 Sistem Fender
3.1 Fender V 500H 1500L (Termasuk Aksesoris) unit 3.00 139,321,200.00 417,963,600.00
SUB-TOTAL C 2,719,273,567.25
RENCANA ANGGARAN BIAYA ( R A B )
DETAILED ENGINEERING DESIGN (DED)
PELABUHAN PENYEBERANGAN SERMATA - PROVINSI MALUKU BARAT DAYA

UNIT PRICE AMOUNT


NO DESCRIPTION UNIT VOLUME
Harga Satuan Jumlah Harga
No Uraian Satuan Volume (Rp.) (Rp.)
D PEKERJAAN BREASTHING DOLPHIN (3 Unit)
1 Pekerjaan Tiang Pancang
1.1 Pengadaan SPP Ø508 t=12mm L=40m ton 140.91 13,037,407.64 1,837,151,322.79
1.2 Transport ke Lokasi & Positioning m' 960.00 115,623.89 110,998,934.40
1.3 Pemancangan m' 960.00 900,760.31 864,729,897.60
1.4 Penyambungan Tiang titik 24.00 887,750.00 21,306,000.00
1.5 Pemotongan Tiang titik 24.00 738,762.17 17,730,292.08
1.6 Proteksi Tiang Pancang Baja
- Selimut Tiang HDPE m2 172.36 2,695,000.00 464,511,114.54
1.7 Cover Plate, t=8mm kg 277.30 27,812.70 7,712,490.49
1.8 Tes PDA titik 1.00 18,890,800.00 18,890,800.00
2 Pekerjaan Beton Bertulang K-350 Insitu
2.1 Pengisi Tiang Pancang SPP Ø508
a. Pekerjaan Beton K-350 m3 4.42 2,600,241.58 11,481,682.81
b. Pekerjaan Pembesian kg 2,772.51 18,982.90 52,630,222.59
2.2 Pile Cap/Blok Beton
a. Pekerjaan Beton K-350 m3 124.49 2,600,241.58 323,697,573.69
b. Pekerjaan Pembesian kg 11,313.11 18,982.90 214,755,572.28
c. Pekerjaan Bekisting m2 220.81 258,290.00 57,033,809.67
3 Sistem Fender
3.1 Fender Type SM500 1000L (Termasuk aksesoris & Frontal Frame) unit 3.00 223,404,400.00 670,213,200.00
4 Sistem Mooring
4.1 Bollard Kap. 25 Ton (termasuk aksesoris) unit 3.00 11,404,400.00 34,213,200.00
5 Kelengkapan Dermaga
5.1 Bracing
a. HB. 200.200.7.11 kg 2,140.71 31,715.34 67,893,351.61
SUB-TOTAL D 4,774,949,464.53
E PEKERJAAN MOORING DOLPHIN (3 Unit)
1 Pekerjaan Tiang Pancang
1.1 Pengadaan SPP Ø508 t=12mm L=40m ton 105.69 13,037,407.64 1,377,863,492.09
1.2 Transport ke Lokasi & Positioning m' 720.00 115,623.89 83,249,200.80
1.3 Pemancangan m' 720.00 900,760.31 648,547,423.20
1.4 Penyambungan Tiang titik 18.00 887,750.00 15,979,500.00
1.5 Pemotongan Tiang titik 18.00 738,762.17 13,297,719.06
1.6 Proteksi Tiang Pancang Baja
- Selimut Tiang HDPE m2 129.27 2,695,000.00 348,383,335.90
1.7 Cover Plate, t=8mm kg 207.98 27,812.70 5,784,367.87
1.8 Tes PDA titik 1.00 18,890,800.00 18,890,800.00
2 Pekerjaan Beton Bertulang K-350 Insitu
2.1 Pengisi Tiang Pancang SPP Ø508
a. Pekerjaan Beton K-350 m3 3.31 2,600,241.58 8,611,262.11
b. Pekerjaan Pembesian kg 2,079.38 18,982.90 39,472,666.94
2.2 Pile Cap/Blok Beton
a. Pekerjaan Beton K-350 m3 70.35 2,600,241.58 182,926,995.15
b. Pekerjaan Pembesian kg 7,102.66 18,982.90 134,829,086.92
c. Pekerjaan Bekisting m2 117.25 258,290.00 30,284,502.50
4 Sistem Mooring
4.1 Bollard Kap. 25 Ton (termasuk aksesoris) unit 3.00 11,404,400.00 34,213,200.00
5 Kelengkapan Dermaga
5.1 Pelindung sudut
a. HB. 200.200.7.11 kg 1,968.56 31,715.34 62,433,396.76
SUB-TOTAL E 3,004,766,949.30
RENCANA ANGGARAN BIAYA ( R A B )
DETAILED ENGINEERING DESIGN (DED)
PELABUHAN PENYEBERANGAN SERMATA - PROVINSI MALUKU BARAT DAYA

UNIT PRICE AMOUNT


NO DESCRIPTION UNIT VOLUME
Harga Satuan Jumlah Harga
No Uraian Satuan Volume (Rp.) (Rp.)
F PEKERJAAN CATWALK
1 Pekerjaan Baja
1.1 Post Rail GSP ∅2" @1500 kg 553.16 31,715.34 17,543,784.01
1.2 Hand Rail GSP ∅2" kg 766.50 31,715.34 24,309,762.73
1.3 Cross Beam WF.150.75.5.7 kg 686.00 31,715.34 21,756,725.20
1.4 Long Beam WF.450.200.9.14 kg 10,970.60 31,715.34 347,936,340.35
1.5 Steel Grating m2 72.18 1,902,920.57 137,343,292.24
1.6 Joint Plate (Include Plate, End Plate, Stiffener, Bolt, Nut dll.) kg 648.81 31,715.34 20,577,330.61
1.7 Angkur Bolt ∅32 nos 48.00 300,000.00 14,400,000.00
SUB-TOTAL F 583,867,235.15
SUB-TOTAL VII 27,967,372,011.57
TOTAL #REF!
Jenis Pekerjaan : Perencanaan Renovasi Gedung Afiliasi Puslitbang Tekmira

Pada Politeknik Energi dan Pertambangan Bandung Badan Pengembangan Sumber Daya Mineral ESDM

Lokasi : Jalan Jenderal Sudirman No. 623 Bandung


Tahun Anggaran : 2020

HARGA SATUAN JUMLAH


NO. URAIAN SATUAN VOLUME
(Rp.) (Rp)
1. 2. 3. 4. 5. 6.

VI. PEKERJAAN MEKANIKAL ELEKTRIKAL


A. PEKERJAAN ELEKTRIKAL
A.1 PEKERJAAN PANEL - PANEL DISTRIBUSI.
Pekerjaan Panel - panel
1 Panel MDP unit 1.00 Rp - Rp -
2 Panel LP - A unit 1.00 Rp - Rp -
3 Panel LP - B unit 1.00 Rp - Rp -
4 Panel PP - A unit 1.00 Rp - Rp -
5 Panel PP - B unit 1.00 Rp - Rp -
6 Panel PP - C unit 1.00 Rp - Rp -
7 Panel PP - D unit 1.00 Rp - Rp -
8 Panel PP - E unit 1.00 Rp - Rp -
Jumlah A.1 Rp -

A.2 PEKERJAAN KABEL FEDEER dan KABEL TRAY


Pengadaan dan pemasangan kabel fedeer dari MDP ke:
Panel LP - A NYY 4 X 16 mm2 + NYA 16 mm2 mtr 5.00 Rp - Rp -
Panel LP - B NYY 4 X 16 mm2 + NYA 16 mm2 mtr 5.00 Rp - Rp -
Panel PP - A NYY 4 X 16 mm2 + NYA 16 mm2 mtr 5.00 Rp - Rp -
Panel PP - B NYY 4 X 6 mm2 + NYA 6 mm2 mtr 5.00 Rp - Rp -
Panel PP - C NYY 4 X 6 mm2 + NYA 6 mm2 mtr 5.00 Rp - Rp -
Panel PP - D NYY 4 X 16 mm2 + NYA 16 mm2 mtr 5.00 Rp - Rp -
Panel PP - E NYY 4 X 6 mm2 + NYA 6 mm2 mtr 5.00 Rp - Rp -
Jumlah A.2 Rp -

A.3 PEKERJAAN INSTALASI PENERANGAN


1 LANTAI SATU
Pemasangan Lampu Gantung LED 20W EX. Philips bh 3.00 Rp - Rp -
Pemasangan Lampu TL Gantung Led 20W EX. Philips bh 105.00 Rp - Rp -
Pemasangan Lampu TL Led 20W EX. Philips bh 16.00 Rp - Rp -
Pemasangan Lampu Downlight Led 10W EX. Philips bh 2.00 Rp - Rp -
Pengadaan Pemasangan Saklar bh 126.00 Rp - Rp -
Pengadaan Pemasangan Stop kontak bh 33.00 Rp - Rp -
Instalasi penerangan, NYM 3 x 2,5 mm2 dalam konduit m1 478.00 Rp - Rp -
Instalasi stop kontak, NYM 3 x 2,5 mm2 dalam konduit m1 170.00 Rp - Rp -
Instalasi stop kontak, NYM 4 x 2,5 mm2 dalam konduit m1 225.00 Rp - Rp -
Jumlah A.3.1 Rp -
2 LANTAI DUA
Pemasangan Lampu Gantung LED 20W EX. Philips bh 19.00 Rp - Rp -
Pemasangan Lampu T-5 Led 8W EX. Philips bh 30.00 Rp - Rp -
Pemasangan Lampu Downlight Led 10W EX. Philips bh 95.00 Rp - Rp -
Pengadaan Pemasangan Saklar bh 144.00 Rp - Rp -
Pengadaan Pemasangan Stop kontak bh 74.00 Rp - Rp -
Instalasi penerangan, NYM 3 x 2,5 mm2 dalam konduit m1 260.00 Rp - Rp -
Instalasi stop kontak, NYM 3 x 2,5 mm2 dalam konduit m1 180.00 Rp - Rp -
Jumlah A.3.2 Rp -
Jumlah A.3 Rp -
B. PEKERJAAN ELEKTRONIK

B.3 PEKERJAAN FIRE ALARM


Peralatan utama
MCFA Type Konvesional unit 1.00 Rp - Rp -
- Kapasitas 1 Zone c/w power suplly
Annunciator unit 1.00 Rp - Rp -
MDF FA unit 1.00 Rp - Rp -
Grounding System + Surge Arester unit 1.00 Rp - Rp -
Instalasi Peralatan Utama ls 1.00 Rp - Rp -
Pengkabelan Sentral ls 1.00 Rp - Rp -
Testing Commissioning ls 1.00 Rp - Rp -

INSTALASI PENGKABELAN
Penarikan kabel dari MDF FA ke :
- TBFA FRC 3x2,5 mm2 + STP 1Pair 18 AWG in HIC 20 mm m 94.00 Rp - Rp -

INSTALASI & FIXTURE FIRE ALARM

- Instalasi Smoke bh 8.00 Rp - Rp -


- Instalasi Heat Detector bh 2.00 Rp - Rp -
- Instalasi Alarm Bell bh 1.00 Rp - Rp -
- Instalasi Indicator Lamp bh 1.00 Rp - Rp -
- TB - FA unit 1.00 Rp - Rp -
Jumlah B.3 Rp -

C. PEKERJAAN MEKANIKAL
C.1 TATA UDARA DAN VENTILASI
Pengadaan & Pemasangan indoor dan outdoor unit AC.
Dudukan dan kelengkapannya
Lantai- 1
1 Pengadaan dan Pemasangan AC 2 PK unit 9.00 Rp - Rp -
2 Pengadaan dan Pemasangan AC 1 PK unit 3.00 Rp - Rp -
Lantai- 2
2 Pengadaan dan Pemasangan AC 1 PK unit 3.00 Rp - Rp -
2 Pengadaan dan Pemasangan AC 1/2 PK unit 11.00 Rp - Rp -

Jumlah C.1 Rp -

C.2 Pemasangan Saluran Air Hujan


Pemasangan Pipa Galvanis
1 Pipa Galvanis Ø 4" t=1,8 mm m1 152.00 Rp - Rp -
2 Roof Drain Ø 4" stenlis steel Bh 16.00 Rp - Rp -

Penanganan Dak beton


1 Levelling adukan t=5cm dan Floor hardener ex.Sika Chapdur m2 92.48 Rp - Rp -

Jumlah C.1 Rp -
Jumlah C Rp -
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERHUBUNGAN LAUT
KANTOR KESYAHBANDARAN DAN OTORITAS PELABUHAN KELAS II TANJUNG PINANG

RENCANA ANGGARAN BIAYA ( R A B )


#REF!
#REF!

VOLUME HARGA SATUAN JUMLAH HARGA


No. URAIAN PEKERJAAN SATUAN
Rp Rp
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi Peralatan Ls 1.00 720,609,693.75 Rp 720,609,693.75
2 Pengukuran dan Positioning Ls 1.00 113,720,625.00 Rp 113,720,625.00
3 PDA Test Ls 1.00 114,099,693.75 Rp 114,099,693.75
4 Direksi Keet dan Gudang Ls 1.00 189,837,630.00 Rp 189,837,630.00
5 Penerangan dan Keselamatan Kerja Ls 1.00 128,883,375.00 Rp 128,883,375.00
6 Pelaporan dan Dokumentasi Ls 1.00 280,510,875.00 Rp 280,510,875.00
SUBTOTAL I Rp 1,547,661,892.50
II PEKERJAAN PEMATANGAN LAHAN
1 Pekerjaan Pematangan Lahan
1.1 Pembersihan Lahan (Grubbing & Clearing) m2 35000 24,841.12 Rp 869,439,200.00
1.2 Pembersihan Lahan (Stripping, t=1 m) m2 35000 55,496.56 Rp 1,942,379,586.23
SUBTOTAL 2 Rp 2,811,818,786.23
III PERKERASAN JALAN DAN DRAINASE
1 Pekerjaan Jalan dan Drainase m2 7056.000 15,749.00 Rp 111,124,950.53
SUBTOTAL 3 Rp 111,124,950.53
IV FASILITAS BANGUNAN DARAT
A TERMINAL PENUMPANG & KANTIN
1 Pekerjaan Tanah
a. Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 329.57 77,328.00 Rp 25,484,604.39
b. Pekerjaan urugan kembali (backfill) m3 115.35 38,420.00 Rp 4,431,725.04
c. Pekerjaan buangan sisa galian ke disposal m3 16.58 33,235.28 Rp 551,182.02
d. Timbunan Tanah, t=150mm m3 115.70 697,300.00 Rp 80,677,581.14
e. Timbunan Pasir, t=100mm m3 76.98 704,704.00 Rp 54,250,283.40
2 Pekerjaan Pondasi Batu Kali
a. Pondasi Batu kali m3 329.57 1,545,655.50 Rp 509,393,996.17
b. Aanstamping m3 24.49 926,906.30 Rp 22,702,751.01
c. Pasir Urug m3 12.25 765,080.00 Rp 9,369,566.67
3 Pekerjaan Beton K-175
a. Lantai kerja m3 70.46 1,880,108.42 Rp 132,480,061.22
4 Pekerjaan Beton Bertulang K-250 Insitu
4.1 Sloof
a. Pekerjaan Beton K-250 m3 329.57 1,388,761.27 Rp 457,687,144.73
b. Pekerjaan Pembesian kg 992.75 18,824.68 Rp 18,688,221.14
c. Pekerjaan Bekisting m2 39.71 378,010.22 Rp 15,010,804.28
4.2 Kolom
a. Pekerjaan Beton K-250 m3 329.57 1,388,761.27 Rp 457,687,144.73
b. Pekerjaan Pembesian kg 964.54 18,824.68 Rp 18,157,189.72
c. Pekerjaan Bekisting m2 34.45 378,010.22 Rp 13,021,667.65
4.3 Balok
a. Pekerjaan Beton K-250 m3 329.57 1,388,761.27 Rp 457,687,144.73
b. Pekerjaan Pembesian kg 344.70 18,824.68 Rp 6,488,795.47
c. Pekerjaan Bekisting m2 13.26 378,010.22 Rp 5,011,488.57
4.4 Ring Balok
a. Pekerjaan Beton K-250 m3 329.57 1,388,761.27 Rp 457,687,144.73
b. Pekerjaan Pembesian kg 840.85 18,824.68 Rp 15,828,821.19
c. Pekerjaan Bekisting m2 33.63 378,010.22 Rp 12,714,069.20
4.5 Dak Atap
a. Pekerjaan Beton K-250 m3 329.57 1,388,761.27 Rp 457,687,144.73
b. Pekerjaan Pembesian kg 840.85 18,824.68 Rp 15,828,821.19
c. Pekerjaan Bekisting m2 33.63 378,010.22 Rp 12,714,069.20
5 Pekerjaan Rangka Atap Baja Ringan
a. Pemasangan Rangka Baja ringan m2 201.50 350,000.00 Rp 70,526,648.65
6 Pekerjaan Arsitektur
6.1 Pekerjaan Dinding
a. Pekerjaan Dinding 1/2 Bata m2 329.57 184,320.00 Rp 60,745,425.73
b. Plesteran m2 1769.14 79,088.00 Rp 139,917,896.11
c. Acian m2 1769.14 42,288.00 Rp 74,813,473.48
6.2 Pekerjaan Lantai
a. Keramik 600x600mm m2 329.57 325,000.00 Rp 107,108,633.69
b. Keramik 400x400mm m2 329.57 300,000.00 Rp 98,869,508.02
c. Keramik non slip 600x600mm m2 115.59 350,000.00 Rp 40,457,011.42
d. Keramik 200x400mm m2 78.51 350,000.00 Rp 27,479,220.06
6.3 Pekerjaan Plafon
a. Plafon Gypsum 9 mm m2 863.44 153,000.00 Rp 132,106,486.90
6.4 Pekerjaan Pintu dan Jendela
a. Pintu P1 (900x2300mm) unit 9.00 3,300,000.00 Rp 29,700,000.00
b. Pintu P2 (1000x2400mm) unit 1.00 3,500,000.00 Rp 3,500,000.00
c. Pintu P3 Pintu & Jendelah Alumunium unit 3.00 5,840,000.00 Rp 17,520,000.00
d. Pintu P4 (Pintu dan Jendela) unit 1.00 4,500,000.00 Rp 4,500,000.00
e. Jendela J1 Alumunium unit 11.00 2,550,000.00 Rp 28,050,000.00
f. Jendela J2 Alumunium unit 1.00 2,500,000.00 Rp 2,500,000.00
g. Jendela J3 Alumunium unit 12.00 800,000.00 Rp 9,600,000.00
h. Jendela J4 Alumunium unit 9.00 500,000.00 Rp 4,500,000.00
6.5 Pekerjaan Finishing
a. Pengecatan Dinding Interior m2 884.57 45,000.00 Rp 39,805,693.18
b. Pengecatan Dinding Exterior m2 884.57 55,000.00 Rp 48,651,402.78
c. Pengecatan Plafond m2 863.44 45,000.00 Rp 38,854,849.09
6.6 Pekerjaan Penutup Atap
a. Pemasangan Atap Genteng m2 201.50 180,000.00 Rp 36,270,847.88
b. Pemasangan Bubung m' 55.14 200,000.00 Rp 11,028,343.45
c. List Plank m' 116.84 200,000.00 Rp 23,368,670.86
7 Pekerjaan listrik
a. Pas. Lampu Pijar +Fitting bh 13 125,500.00 Rp 1,571,125.82
b. Pas. Lampu Down light + Fitting bh 100 156,000.00 Rp 15,623,625.66
c. Pek. Pas. Stop Kontak (with child protection) setara Philips bh 22 25,000.00 Rp 542,487.00
d. Pek. Pas. Saklar Tunggal, setara Philips bh 21 25,000.00 Rp 521,622.12
e. Pek. Pas. Saklar Ganda, setara Philips bh 29 45,000.00 Rp 1,314,487.74
f. Pas. Instalasi Titik Api ttk 184.45 250,000.00 Rp 46,111,395.18
8 Pekerjaan Sanitasi dan saniter
a. Pas. Closet Duduk + Accessories bh 7 5,316,800.00 Rp 35,499,014.06
b. Pas. Wastafel + Accessories bh 5 3,457,340.00 Rp 17,312,880.11
c. Pas. Kran Dinding bh 7 175,000.00 Rp 1,168,433.54
d. Pas. Instalasi Air Bersih ls 1.00 10,500,000.00 Rp 10,500,000.00
e. Pas. Instalasi Air Kotor ls 1.00 8,579,300.00 Rp 8,579,300.00
f. Pek. Septictank ls 1.00 17,558,000.00 Rp 17,558,000.00
SUBTOTAL 4 Rp 4,467,417,904.86
B KANTOR PELABUHAN
1 Pekerjaan Tanah
a. Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 33.75 89,100.00 Rp 3,007,125.00
b. Pekerjaan urugan kembali (backfill) m3 16.575 44,000.00 Rp 729,300.00
c. Pekerjaan buangan sisa galian ke disposal m3 17.175 38,126.00 Rp 654,814.05
2 Pekerjaan Pondasi Tapak
a. Lantai Kerja m3 1.92 1,355,172.42 Rp 2,601,931.04
3 Pekerjaan Beton K-175
a. Lantai Kerja m3 12.626 1,355,172.42 Rp 17,110,666.11
4 Pekerjaan Beton Bertulang K-250 Insitu Rp -
4.1 Pondasi Rp -
a. Pekerjaan Beton K-250 m3 17.175 2,219,663.58 Rp 38,122,722.03
b. Pekerjaan Pembesian kg 901.878 15,749.00 Rp 14,203,677.46
c. Pekerjaan Bekisting m2 51.000 299,435.08 Rp 15,271,189.16
4.2 Sloof Rp -
a. Pekerjaan Beton K-250 m3 5.850 2,219,663.58 Rp 12,985,031.96
b. Pekerjaan Pembesian kg 915.161 15,749.00 14,203,677.46
c. Pekerjaan Bekisting m2 97.500 299,435.08 15,271,189.16
4.3 Kolom `
a. Pekerjaan Beton K-250 m3 2.609 2,219,663.58 Rp 5,790,880.32
b. Pekerjaan Pembesian kg 698.626 15,749.00 Rp 11,002,663.88
c. Pekerjaan Bekisting m2 59.632 299,435.08 Rp 17,855,912.78
4.4 Ring Balok Rp -
a. Pekerjaan Beton K-250 m3 4.950 2,219,663.58 Rp 10,987,334.73
b. Pekerjaan Pembesian kg 774.371 15,749.00 Rp 12,195,575.90
c. Pekerjaan Bekisting m2 82.500 299,435.08 Rp 24,703,394.22
4.5 Pelat Lantai Rp -
a. Pekerjaan Beton K-250 m3 30.303 2,219,663.58 Rp 67,262,152.58
b. Pekerjaan Pembesian kg 3787.857 15,749.00 Rp 59,654,969.31
c. Pekerjaan Bekisting m2 252.524 299,435.08 Rp 75,614,492.11
5 Pekerjaan Rangka Atap Baja Ringan Rp -
5.1 Pemasangan Rangka Baja ringan m2 284.76 350,000.00 Rp 99,666,000.00
6 Pekerjaan Arsitektur Rp -
6.1 Pekerjaan Dinding Rp -
a. Pekerjaan Dinding 1/2 Bata m2 294.722 257,191.72 Rp 75,800,059.55
b. Plesteran m2 589.444 52,701.00 Rp 31,064,288.24
c. Acian m2 589.444 48,328.50 Rp 28,486,944.35
6.2 Pekerjaan Lantai Rp -
a. Keramik Glossy 600x600mm m2 188.795 492,353.28 Rp 92,953,838.24
b. Keramik non slip 400x400mm m2 11.205 172,396.57 Rp 1,931,703.61
c. Lantai Plesteran K-125 m2 103.84 Rp -
6.3 Pekerjaan Plafon Rp -
a. Plafon Gypsum 9 mm m2 293.8795 153,000.00 Rp 44,963,563.50
6.4 Pekerjaan Pintu dan Jendela Rp -
a. Pintu P1 (1800x2600 mm) Alumunium + Kaca unit 1 3,300,000.00 Rp 3,300,000.00
b. Pintu P2 (2200x2600mm) Alumunium + Kaca unit 1 3,500,000.00 Rp 3,500,000.00
c. Pintu P3 (900x2600mm) Alumunium + Kaca unit 8 5,840,000.00 Rp 46,720,000.00
d. Pintu P4 (700x2200mm) Alumunium unit 4 4,500,000.00 Rp 18,000,000.00
e. Jendela J1 (4740x2502mm) Alumunium + Kaca unit 1 2,550,000.00 Rp 2,550,000.00
f. Jendela J2 (1700x1600mm) Alumunium + Kaca unit 5 2,500,000.00 Rp 12,500,000.00
g. Jendela J3 (1700x1600mm) Alumunium + Kaca unit 2 800,000.00 Rp 1,600,000.00
h. Jendela J4 (950x600mm) Alumunium + Kaca unit 6 500,000.00 Rp 3,000,000.00
6.5 Pekerjaan Finishing Rp -
a. Pengecatan Dinding Interior m2 510.623 45,000.00 Rp 22,978,035.00
b. Pengecatan Dinding Exterior m2 195.339 55,000.00 Rp 10,743,645.00
c. Pengecatan Plafond m2 293.8795 45,000.00 Rp 13,224,577.50
6.6 Pekerjaan Penutup Atap Rp -
a. Pemasangan Atap Genteng m2 130.522 180,000.00 Rp 23,493,960.00
b. Pemasangan Bubung Metal Zincalumn m' 39.348 200,000.00 Rp 7,869,600.00
7 Pekerjaan Listrik Rp -
a. Pas. Lampu LED T8 LED 16W bh 30 125,500.00 Rp 3,765,000.00
b. Pas. Lampu Down light + Fitting bh 9 156,000.00 Rp 1,404,000.00
c. Pek. Pas. Stop Kontak bh 11 25,000.00 Rp 275,000.00
d. Pek. Pas. Saklar Tunggal, setara Philips bh 5 25,000.00 Rp 125,000.00
e. Pek. Pas. Saklar Ganda, setara Philips bh 4 45,000.00 Rp 180,000.00
f. Pas. Lampu Dinding Spotlight Outdoor bh 6 140,000.00 Rp 840,000.00
8 Pekerjaan Sanitasi dan Saniter Rp -
a. Pas. Closet Duduk + Accessories bh 4 5,316,800.00 Rp 21,267,200.00
b. Pas. Wastafel + Accessories bh 4 3,457,340.00 Rp 13,829,360.00
c. Pas. Kran Dinding bh 4 175,000.00 Rp 700,000.00
d. Pas. Instalasi Air Bersih ls 1 10,500,000.00 Rp 10,500,000.00
e. Pas. Instalasi Air Kotor ls 1 8,579,300.00 Rp 8,579,300.00
f. Pek. Septictank ls 1 17,558,000.00 Rp 17,558,000.00
SUBTOTAL 5 Rp 1,042,597,774.26
C KANTOR KSOP Rp -
1 Pekerjaan Tanah
a. Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 105 89,100.00 Rp 9,355,500.00
b. Pekerjaan urugan kembali (backfill) m3 50.356 44,000.00 Rp 2,215,675.00
c. Pekerjaan buangan sisa galian ke disposal m3 54.644 38,126.00 Rp 2,083,347.61
2 Pekerjaan Pondasi Tapak
a. Lantai Kerja m3 5.8675 1,355,172.42 Rp 7,951,474.16
3 Pekerjaan Beton K-175
a. Lantai Kerja m3 39.484375 1,355,172.42 Rp 53,508,135.89
4 Pekerjaan Beton Bertulang K-250 Insitu Rp -
4.1 Pondasi Rp -
a. Pekerjaan Beton K-250 m3 54.644 2,219,663.58 Rp 121,290,741.90
b. Pekerjaan Pembesian kg 3281.145 15,749.00 Rp 51,674,754.38
c. Pekerjaan Bekisting m2 144.500 299,435.08 Rp 43,268,369.27
4.2 Sloof
a. Pekerjaan Beton K-250 m3 43.660 2,219,663.58 Rp 96,910,512.02
b. Pekerjaan Pembesian kg 5209.266 15,749.00 Rp 82,040,738.67
c. Pekerjaan Bekisting m2 448.950 299,435.08 Rp 134,431,379.83
4.3 Kolom `
a. Pekerjaan Beton K-250 m3 23.232 2,219,663.58 Rp 51,567,779.27
b. Pekerjaan Pembesian kg 6895.562 15,749.00 Rp 108,598,213.55
c. Pekerjaan Bekisting m2 406.020 299,435.08 Rp 121,576,631.78
4.4 Balok Rp -
a. Pekerjaan Beton K-250 m3 44.020 2,219,663.58 Rp 97,709,590.91
b. Pekerjaan Pembesian kg 5311.161 15,749.00 Rp 83,645,481.85
c. Pekerjaan Bekisting m2 459.700 299,435.08 Rp 137,650,306.96
4.4 Ring Balok Rp -
a. Pekerjaan Beton K-250 m3 44.020 2,219,663.58 Rp 97,709,590.91
b. Pekerjaan Pembesian kg 5311.161 15,749.00 Rp 83,645,481.85
c. Pekerjaan Bekisting m2 459.700 299,435.08 Rp 137,650,306.96
4.5 Pelat Lantai Rp -
a. Pekerjaan Beton K-250 m3 180.659 2,219,663.58 Rp 401,003,035.57
b. Pekerjaan Pembesian kg 22582.422 15,749.00 Rp 355,650,583.02
c. Pekerjaan Bekisting m2 1389.688 299,435.08 Rp 416,121,189.80
5 Pekerjaan Rangka Atap Baja Ringan Rp -
5.1 Pemasangan Rangka Baja ringan m2 759 Rp -
6 Pekerjaan Arsitektur Rp -
6.1 Pekerjaan Dinding Rp -
a. Pekerjaan Dinding 1/2 Bata m2 1701.8 Rp -
b. Plesteran m2 3403.6 Rp -
c. Acian m2 3403.6 Rp -
d. Keramik Dinding 200x400mm m2 61.515 Rp -
6.2 Pekerjaan Lantai Rp -
a. Keramik Glossy 600x600 mm m2 1175.15 Rp -
b. Keramik non slip 400x400mm m2 24.85 Rp -
6.3 Pekerjaan Plafon Rp -
a. Plafon Gypsum 9 mm m2 1359 Rp -
6.4 Pekerjaan Pintu dan Jendela Rp -
a. Pintu P1 (2200x2980mm) Kayu Double Multi Lapis HPL + Kaca unit 8 Rp -

b. unit Rp -
Pintu P2 (900x2250mm) Alumunium + Kayu Double Multi Lapis HPL 10
c. Pintu P3 (900x2250mm) Alumunium unit 12 Rp -
d. PJ (2525x2200mm) Alumunium + Kayu Double + Kaca unit 6 Rp -
e. Jendela J2 (1700x1600mm) Alumunium + Kaca unit 47 Rp -
f. Jendela J3 (870x600mm) Alumunium +Kaca unit 6 Rp -
g. Jendela JS1 (1000x3080mm) Alumunium + Kayu Double unit 6 Rp -
h. Jendela JS2 (1660x4430mm) Alumunium + Kayu Double unit 2 Rp -
6.5 Pekerjaan Finishing Rp -
a. Pengecatan Dinding Interior m2 2733.6 Rp -
b. Pengecatan Dinding Exterior m2 670 Rp -
c. Pengecatan Plafond m2 1359 Rp -
6.6 Pekerjaan Penutup Atap Rp -
a. Pemasangan Atap Metal Zincalumn m2 431.396 Rp -
b. Pemasangan Bubung Metal Zincalumn m' Rp -
7 Pekerjaan Listrik Rp -
a. Pas. Lampu LED T8 LED 16W bh 92 Rp -
b. Pas. Lampu Down light + Fitting bh 36 Rp -
c. Pek. Pas. Stop Kontak bh 50 Rp -
d. Pek. Pas. Saklar Tunggal, setara Philips bh 14 Rp -
e. Pek. Pas. Saklar Ganda, setara Philips bh 15 Rp -
f. Pas. Lampu Dinding Spotlight Outdoor ttk 28 Rp -
8 Pekerjaan Sanitasi dan Saniter Rp -
a. Pas. Closet Duduk + Accessories bh 10 Rp -
b. Pas. Wastafel + Accessories bh 8 Rp -
c. Urinor bh 6 Rp -
d. Pas. Instalasi Air Bersih ls 1 Rp -
e. Pas. Instalasi Air Kotor ls 1 Rp -
f. Pek. Septictank ls 1 Rp -
D Gudang Pelabuhan Rp -
1 Pekerjaan Tanah 6,000,000.00 Rp -
a. Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 20 Rp -
b. Pekerjaan urugan kembali (backfill) m3 11.250 Rp -
c. Pekerjaan buangan sisa galian ke disposal m3 8.750 Rp -
2 Pekerjaan Pondasi Tapak Rp -
a. Lantai Kerja m3 1.210 Rp -
3 Pekerjaan Beton K-175 Rp -
a. Lantai Kerja m3 37.4525 Rp -
4 Pekerjaan Beton Bertulang K-250 Insitu Rp -
4.1 Pondasi Rp -
a. Pekerjaan Beton K-250 m3 8.750 Rp -
b. Pekerjaan Pembesian kg 866.291 Rp -
c. Pekerjaan Bekisting m2 2.840 Rp -
4.2 Sloof Rp -
a. Pekerjaan Beton K-250 m3 10.688 Rp -
b. Pekerjaan Pembesian kg 1147.621 Rp -
c. Pekerjaan Bekisting m2 109.250 Rp -
4.3 Kolom Rp -
a. Pekerjaan Beton K-250 m3 Rp -
b. Pekerjaan Pembesian kg Rp -
c. Pekerjaan Bekisting m2 Rp -
4.4 Ring Balok Rp -
a. Pekerjaan Beton K-250 m3 10.688 Rp -
b. Pekerjaan Pembesian kg 1147.621 Rp -
c. Pekerjaan Bekisting m2 109.250 Rp -
4.5 Pelat Lantai Rp -
a. Pekerjaan Beton K-250 m3 Rp -
b. Pekerjaan Pembesian kg Rp -
c. Pekerjaan Bekisting m2 Rp -
5 Pekerjaan Rangka Atap Rp -
5.1 Purlin P1 CNP.100x50x20x2.3 kg 674.4 m #VALUE!
5.2 Rafter R1 IWF.200.100.5,5.8S kg 151.92 m #VALUE!
5.3 Sagrod SG Dimeter 19 kg 141.776 m #VALUE!
5.4 Trekstang Diameter 10 436.8 m #VALUE!
6 Pekerjaan Arsitektur Rp -
6.1 Pekerjaan Dinding Rp -
a. Pekerjaan Dinding 1/2 Bata m2 660 Rp -
b. Plesteran m2 1320 Rp -
c. Acian m2 1320 Rp -
6.2 Pekerjaan Lantai Rp -
a. Plesteran K-125 m2 749.05 Rp -
6.3 Pekerjaan Plafon Rp -
a. Plafon Gypsum 9 mm m2 749.05 Rp -
6.4 Pekerjaan Pintu dan Jendela Rp -
a. Pintu P1 (4000x4000) Plat Besi unit 2 Rp -
b. Jendela J1 (2200x820mm) unit 12 Rp -
c. Jendela J2 (2000x745mm) Alumunium unit 4 Rp -
6.5 Pekerjaan Finishing Rp -
a. Pengecatan Dinding Interior m2 660 Rp -
b. Pengecatan Dinding Exterior m2 660 Rp -
c. Pengecatan Plafond m2 749.05 Rp -
6.6 Pekerjaan Penutup Atap Rp -
a. Pemasangan Atap Metal Zincalumn m2 362.92 Rp -
b. Pemasangan Bubung Metal Zincalumn m' 42.2 Rp -
7 Pekerjaan Listrik Rp -
a. Pas. Lampu LED T8 LED 16W bh 24 Rp -
b, Pek. Pas. Stop Kontak bh 6 Rp -
c. Pek. Pas. Saklar Tunggal bh 3 Rp -
e. Pas. Lampu Spotlight ttk 6 Rp -
E Kantor Imigrasi, Karantina, K3, Bea Cukai Rp -
1 Pekerjaan Tanah Rp -
a. Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 30.72 Rp -
b. Pekerjaan urugan kembali (backfill) m3 15.300 Rp -
c. Pekerjaan buangan sisa galian ke disposal m3 15.420 Rp -
2 Pekerjaan Pondasi Tapak Rp -
a. Lantai Kerja m3 1.536 Rp -
3 Pekerjaan Beton K-175 Rp -
a. Lantai Kerja m3 Rp -
4 Pekerjaan Beton Bertulang K-250 Insitu Rp -
4.1 Pondasi Rp -
a. Pekerjaan Beton K-250 m3 13.884 Rp -
b. Pekerjaan Pembesian kg 790.447 Rp -
c. Pekerjaan Bekisting m2 43.680 Rp -
4.2 Sloof Rp -
a. Pekerjaan Beton K-250 m3 2.610 Rp -
b. Pekerjaan Pembesian kg 852.367 Rp -
c. Pekerjaan Bekisting m2 43.500 Rp -
4.3 Kolom Rp -
a. Pekerjaan Beton K-250 m3 1.710 Rp -
b. Pekerjaan Pembesian kg 151.348 Rp -
c. Pekerjaan Bekisting m2 36.000 Rp -
4.4 Ring Balok Rp -
a. Pekerjaan Beton K-250 m3 2.610 Rp -
b. Pekerjaan Pembesian kg 852.367 Rp -
c. Pekerjaan Bekisting m2 43.500 Rp -
4.5 Pelat Lantai Rp -
a. Pekerjaan Beton K-250 m3 16.031 Rp -
b. Pekerjaan Pembesian kg Rp -
c. Pekerjaan Bekisting m2 106.875 Rp -
5 Pekerjaan Rangka Atap Baja Ringan Rp -
5.1 Pemasangan Rangka Baja ringan IWF 150x75x5x7 m2 79.326 Rp -
5.2 Trekstang Diameter 12 m' 81.84 Rp -
6 Pekerjaan Arsitektur Rp -
6.1 Pekerjaan Dinding Rp -
a. Pekerjaan Dinding 1/2 Bata m2 159 Rp -
b. Plesteran m2 318 Rp -
c. Acian m2 318 Rp -
d. Keramik Dinding m2 42.39 Rp -
e. Kaca 560 x 840 m2 4.704 Rp -
6.2 Pekerjaan Lantai Rp -
a. Keramik Glossy 600x600mm m2 60 Rp -
b. Keramik non slip 400x400mm m2 15 Rp -
6.3 Pekerjaan Plafon Rp -
a. Plafon Gypsum 9 mm m2 14.75322 Rp -
6.4 Pekerjaan Pintu dan Jendela Rp -
a. Pintu P1 (900x2600mm) Alumunium + Kaca unit 5 Rp -
b. Pintu P2 (700x2200mm) Alumunium unit 2 Rp -
c,, Jendela J1 (1700x2000mm) Alumunium + Kaca unit 4 Rp -
d. Jendela J2 (870x600mm) Alumunium +Kaca unit 6 Rp -
6.5 Pekerjaan Finishing Rp -
a. Pengecatan Dinding Interior m2 228 Rp -
b. Pengecatan Dinding Exterior m2 120 Rp -
c. Pengecatan Plafond m2 14.75322 Rp -
6.6 Pekerjaan Penutup Atap Rp -
a. Pemasangan Atap Genteng m2 79.326 Rp -
b. Pemasangan Bubung Metal Zincalumn m' 26.048 Rp -
7 Pekerjaan Listrik Rp -
a. Pas. Lampu LED T8 LED 16W bh 12 Rp -
b. Pas. Lampu Down light + Fitting bh 6 Rp -
c. Pek. Pas. Stop Kontak bh 8 Rp -
d. Pek. Pas. Saklar Tunggal bh 5 Rp -
e. Pek. Pas. Saklar Ganda, setara Philips bh 1 Rp -
f. Pas. Lampu Spotlight ttk 5 Rp -
8 Pekerjaan Sanitasi dan Saniter Rp -
a. Pas. Closet Duduk + Accessories bh 2 Rp -
b. Pas. Wastafel + Accessories bh 1 Rp -
c. Urinoir bh 3 Rp -
e. Pas. Instalasi Air Bersih ls 1 Rp -
f. Pas. Instalasi Air Kotor ls 1 Rp -
F Pos Jaga Rp -
1 Pekerjaan Tanah Rp -
a. Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 11.2 Rp -
b. Pekerjaan urugan kembali (backfill) m3 4.340 Rp -
c. Pekerjaan buangan sisa galian ke disposal m3 6.860 Rp -
2 Pekerjaan Pondasi Batu Kali Rp -
a. Pondasi Batu Kali m3 4.2 Rp -
b. Pasir Urug m3 0.700 Rp -
3 Pekerjaan Beton K-175 Rp -
a. Lantai Kerja m3 0.7 Rp -
4 Pekerjaan Beton Bertulang K-250 Insitu Rp -
4.1 Sloof Rp -
a. Pekerjaan Beton K-250 m3 1.260 Rp -
b. Pekerjaan Pembesian kg 390.035 Rp -
c. Pekerjaan Bekisting m2 21.000 Rp -
4.2 Kolom Rp -
a. Pekerjaan Beton K-250 m3 0.792 Rp -
b. Pekerjaan Pembesian kg 167.741 Rp -
c. Pekerjaan Bekisting m2 15.840 Rp -
4.3 Ring Balok Rp -
a. Pekerjaan Beton K-250 m3 1.125 Rp -
b. Pekerjaan Pembesian kg 348.246 Rp -
c. Pekerjaan Bekisting m2 18.750 Rp -
4.4 Pelat Lantai Rp -
a. Pekerjaan Beton K-250 m3 3.750 Rp -
b. Pekerjaan Pembesian kg Rp -
c. Pekerjaan Bekisting m2 25.000 Rp -
5 Pekerjaan Rangka Atap Baja Ringan Rp -
5.1 Pemasangan Rangka Baja ringan m2 137.251036 Rp -
5.2 Trekstang Diameter 12 m 19.52 Rp -
6 Pekerjaan Arsitektur Rp -
6.1 Pekerjaan Dinding Rp -
a. Pekerjaan Dinding 1/2 Bata m2 Rp -
b. Plesteran m2 84 Rp -
c. Acian m2 168 Rp -
6.2 Pekerjaan Lantai 168 Rp -
a. Keramik Non Glossy 600x600mm m2 21.4 Rp -
b. Keramik non slip 400x400mm m2 3.6 Rp -
6.3 Pekerjaan Plafon Rp -
a. Plafon Gypsum 9 mm m2 65.61 Rp -
6.4 Pekerjaan Pintu dan Jendela Rp -
a. Pintu P1 (900x2600mm) Alumunium + Kaca unit 2 Rp -
b. Jendela J2 (1700x2000mm) Alumunium + Kaca unit 1 Rp -
c. Jendela J3 (870x600mm) Alumunium +Kaca unit 1 Rp -
6.5 Pekerjaan Finishing m2 Rp -
a. Pengecatan Dinding Interior m2 108 Rp -
b. Pengecatan Dinding Exterior m2 60 Rp -
c. Pengecatan Plafond m2 65.61 Rp -
d. Ukiran Kayu unit 3.84 Rp -
6.6 Pekerjaan Penutup Atap Rp -
a. Pemasangan Atap Genteng m2 137.251036 Rp -
b. Pemasangan Bubung Metal Zincalumn m' 17.804 Rp -
7 Pekerjaan Listrik Rp -
a. Pas. Lampu LED T8 LED 16W bh 2 Rp -
b. Pas. Lampu Down light + Fitting bh 5 Rp -
c. Pek. Pas. Stop Kontak bh 2 Rp -
d. Pek. Pas. Saklar Tunggal bh 1 Rp -
e. Pek. Pas. Saklar Ganda, setara Philips bh 2 Rp -
f. Pas. Lampu Spotlight ttk 4 Rp -
8 Pekerjaan Sanitasi dan Saniter Rp -
a. Pas. Closet Duduk + Accessories bh 1 Rp -
c. Pas. Kran Dinding bh 1 Rp -
d. Talang Air m' 32.4 Rp -
d. Pas. Instalasi Air Bersih ls 1 Rp -
e. Pas. Instalasi Air Kotor ls 1 Rp -
G Mushola Rp -
1 Pekerjaan Tanah Rp -
a. Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 8 Rp -
b. Pekerjaan urugan kembali (backfill) m3 2.125 Rp -
c. Pekerjaan buangan sisa galian ke disposal m3 5.875 Rp -
2 Pekerjaan Pondasi Batu Kali Rp -
a. Pondasi Batu kali m3 3 Rp -
b. Pasir Urug m3 0.500 Rp -
3 Pekerjaan Beton K-175 Rp -
a. Lantai Kerja m3 1.25 Rp -
4 Pekerjaan Beton Bertulang K-250 Insitu Rp -
4.1 Sloof Rp -
a. Pekerjaan Beton K-250 m3 1.125 Rp -
b. Pekerjaan Pembesian kg 348.246 Rp -
c. Pekerjaan Bekisting m2 18.750 Rp -
4.2 Kolom Rp -
a. Pekerjaan Beton K-250 m3 0.528 Rp -
b. Pekerjaan Pembesian kg 111.827 Rp -
c. Pekerjaan Bekisting m2 10.560 Rp -
4.3 Ring Balok Rp -
a. Pekerjaan Beton K-250 m3 1.125 Rp -
b. Pekerjaan Pembesian kg 348.246 Rp -
c. Pekerjaan Bekisting m2 18.750 Rp -
4.4 Pelat Lantai Rp -
a. Pekerjaan Beton K-250 m3 4.256 Rp -
b. Pekerjaan Pembesian kg Rp -
c. Pekerjaan Bekisting m2 25.000 Rp -
4.5 Lisplank Rp -
a. Lisplang Kayu m2 3.348 Rp -
5 Pekerjaan Rangka Atap Baja Ringan Rp -
5.1 Pemasangan Rangka Baja ringan IWF 150x75x5x7 m2 137.251036 Rp -
5.2 Trekstang Diameter 12 m 19.52 Rp -
6 Pekerjaan Arsitektur Rp -
6.1 Pekerjaan Dinding Rp -
a. Pekerjaan Dinding 1/2 Bata m2 62.575 Rp -
b. Plesteran m2 125.15 Rp -
c. Acian m2 125.15 Rp -
d. Keramik Dinding 5.15 Rp -
6.2 Pekerjaan Lantai Rp -
a. Keramik Glossy 600x600mm m2 26.58625 Rp -
b. Keramik Non Slip 400x400mm m2 1.789 Rp -
6.3 Pekerjaan Plafon Rp -
a. Plafon Gypsum 9 mm m2 65.61 Rp -
6.4 Pekerjaan Pintu dan Jendela Rp -
a. Jendela J7 (1438X1819mm) Kayu Double Multi Lapis HPL + Kaca unit 4 Rp -
b. Pintu (2763x1325)mm unit 1 Rp -
6.5 Pekerjaan Finishing Rp -
a. Pengecatan Dinding Interior m2 60 Rp -
b. Pengecatan Dinding Exterior m2 60 Rp -
c. Pengecatan Plafond m2 65.61 Rp -
6.6 Pekerjaan Penutup Atap Rp -
a. Pemasangan Atap Genteng m2 137.251036 Rp -
b. Mahkota Plat Steel 3mm bh 1 Rp -
c. Pemasangan Bubung Metal Zincalumn m' 17.804 Rp -
7 Pekerjaan Listrik Rp -
a. Pas. Lampu LED T8 LED 16W bh 3 Rp -
b. Pas. Lampu Down light + Fitting bh 12 Rp -
c. Pek. Pas. Stop Kontak bh 2 Rp -
d. Pek. Pas. Saklar Ganda, setara Philips bh 2 Rp -
8 Pekerjaan Sanitasi dan Saniter Rp -
a. Talang Air m 32.4 Rp -
b. Pas. Kran Dinding bh 3 Rp -
c. Pas. Instalasi Air Bersih ls 1 Rp -
d. Pas. Instalasi Air Kotor ls 1 Rp -
H Rumah Genset Rp -
1 Pekerjaan Tanah Rp -
a. Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 Rp -
b. Pekerjaan urugan kembali (backfill) m3 Rp -
c. Pekerjaan buangan sisa galian ke disposal m3 Rp -
2 Pekerjaan Pondasi Tapak Rp -
a. Lantai Kerja m3 Rp -
3 Pekerjaan Beton K-175 Rp -
a. Lantai Kerja m3 Rp -
4 Pekerjaan Beton Bertulang K-250 Insitu Rp -
4.1 Pondasi Rp -
a. Pekerjaan Beton K-250 m3 Rp -
b. Pekerjaan Pembesian kg Rp -
c. Pekerjaan Bekisting m2 Rp -
4.2 Sloof Rp -
a. Pekerjaan Beton K-250 m3 Rp -
b. Pekerjaan Pembesian kg Rp -
c. Pekerjaan Bekisting m2 Rp -
4.3 Kolom Rp -
a. Pekerjaan Beton K-250 m3 Rp -
b. Pekerjaan Pembesian kg Rp -
c. Pekerjaan Bekisting m2 Rp -
4.4 Balok Rp -
a. Pekerjaan Beton K-250 m3 Rp -
b. Pekerjaan Pembesian kg Rp -
c. Pekerjaan Bekisting m2 Rp -
4.4 Ring Balok Rp -
a. Pekerjaan Beton K-250 m3 Rp -
b. Pekerjaan Pembesian kg Rp -
c. Pekerjaan Bekisting m2 Rp -
4.5 Pelat Lantai Rp -
a. Pekerjaan Beton K-250 m3 Rp -
b. Pekerjaan Pembesian kg Rp -
c. Pekerjaan Bekisting m2 Rp -
4.6 Lisplank Rp -
a. Pekerjaan Beton K-250 m3 Rp -
b. Pekerjaan Pembesian kg Rp -
c. Pekerjaan Bekisting m2 Rp -
5 Pekerjaan Rangka Atap Baja Ringan Rp -
5.1 Pemasangan Rangka Baja ringan m2 Rp -
6 Pekerjaan Arsitektur Rp -
6.1 Pekerjaan Dinding Rp -
a. Pekerjaan Dinding 1/2 Bata m2 Rp -
b. Plesteran m2 Rp -
c. Acian m2 Rp -
6.2 Pekerjaan Lantai Rp -
a. Keramik 400x400mm m2 Rp -
6.3 Pekerjaan Plafon Rp -
a. Plafon Gypsum 9 mm m2 Rp -
6.4 Pekerjaan Pintu dan Jendela Rp -
a. Pintu P1 (2200x2980mm) Kayu Double Multi Lapis HPL + Kaca unit Rp -

b. unit Rp -
Pintu P2 (900x2250mm) Alumunium + Kayu Double Multi Lapis HPL
c. Pintu P3 (900x2250mm) Alumunium unit Rp -
d. PJ (2525x2200mm) Alumunium + Kayu Double + Kaca unit Rp -
e. Jendela J2 (1700x1600mm) Alumunium + Kaca unit Rp -
f. Jendela J3 (870x600mm) Alumunium +Kaca unit Rp -
g. Jendela JS1 (1000x3080mm) Alumunium + Kayu Double unit Rp -
h. Jendela JS2 (1660x4430mm) Alumunium + Kayu Double unit Rp -
6.5 Pekerjaan Finishing Rp -
a. Pengecatan Dinding Interior m2 Rp -
b. Pengecatan Dinding Exterior m2 Rp -
c. Pengecatan Plafond m2 Rp -
6.6 Pekerjaan Penutup Atap Rp -
a. Pemasangan Atap Metal Zincalumn m2 Rp -
b. Pemasangan Bubung Metal Zincalumn m' Rp -
7 Pekerjaan Listrik Rp -
a. Pas. Lampu Pijar +Fitting bh Rp -
b. Pas. Lampu Down light + Fitting bh Rp -
c. Pek. Pas. Stop Kontak (with child protection) setara Philips bh Rp -
d. Pek. Pas. Saklar Tunggal, setara Philips bh Rp -
e. Pek. Pas. Saklar Ganda, setara Philips bh Rp -
f. Pas. Instalasi Titik Api ttk Rp -
8 Pekerjaan Sanitasi dan Saniter Rp -
a. Pas. Closet Duduk + Accessories bh Rp -
b. Pas. Wastafel + Accessories bh Rp -
c. Pas. Kran Dinding bh Rp -
d. Pas. Instalasi Air Bersih ls Rp -
e. Pas. Instalasi Air Kotor ls Rp -
f. Pek. Septictank ls Rp -
I Gapura Rp -
1 Pekerjaan Tanah Rp -
a. Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 Rp -
b. Pekerjaan urugan kembali (backfill) m3 Rp -
c. Pekerjaan buangan sisa galian ke disposal m3 Rp -
2 Pekerjaan Pondasi Tapak Rp -
a. Lantai Kerja m3 Rp -
3 Pekerjaan Beton K-175 Rp -
a. Lantai Kerja m3 Rp -
4 Pekerjaan Beton Bertulang K-250 Insitu Rp -
4.1 Pondasi Rp -
a. Pekerjaan Beton K-250 m3 Rp -
b. Pekerjaan Pembesian kg Rp -
c. Pekerjaan Bekisting m2 Rp -
4.2 Sloof Rp -
a. Pekerjaan Beton K-250 m3 Rp -
b. Pekerjaan Pembesian kg Rp -
c. Pekerjaan Bekisting m2 Rp -
4.3 Kolom Rp -
a. Pekerjaan Beton K-250 m3 Rp -
b. Pekerjaan Pembesian kg Rp -
c. Pekerjaan Bekisting m2 Rp -
4.4 Balok Rp -
a. Pekerjaan Beton K-250 m3 Rp -
b. Pekerjaan Pembesian kg Rp -
c. Pekerjaan Bekisting m2 Rp -
4.4 Ring Balok Rp -
a. Pekerjaan Beton K-250 m3 Rp -
b. Pekerjaan Pembesian kg Rp -
c. Pekerjaan Bekisting m2 Rp -
4.5 Pelat Lantai Rp -
a. Pekerjaan Beton K-250 m3 Rp -
b. Pekerjaan Pembesian kg Rp -
c. Pekerjaan Bekisting m2 Rp -
4.6 Lisplank Rp -
a. Pekerjaan Beton K-250 m3 Rp -
b. Pekerjaan Pembesian kg Rp -
c. Pekerjaan Bekisting m2 Rp -
5 Pekerjaan Rangka Atap Baja Ringan Rp -
5.1 Pemasangan Rangka Baja ringan m2 Rp -
6 Pekerjaan Arsitektur Rp -
6.1 Pekerjaan Dinding Rp -
a. Pekerjaan Dinding 1/2 Bata m2 Rp -
b. Plesteran m2 Rp -
c. Acian m2 Rp -
6.2 Pekerjaan Lantai Rp -
a. Keramik 400x400mm m2 Rp -
6.3 Pekerjaan Plafon Rp -
a. Plafon Gypsum 9 mm m2 Rp -
6.4 Pekerjaan Pintu dan Jendela Rp -
a. Pintu P1 (2200x2980mm) Kayu Double Multi Lapis HPL + Kaca unit Rp -

b. unit Rp -
Pintu P2 (900x2250mm) Alumunium + Kayu Double Multi Lapis HPL
c. Pintu P3 (900x2250mm) Alumunium unit Rp -
d. PJ (2525x2200mm) Alumunium + Kayu Double + Kaca unit Rp -
e. Jendela J2 (1700x1600mm) Alumunium + Kaca unit Rp -
f. Jendela J3 (870x600mm) Alumunium +Kaca unit Rp -
g. Jendela JS1 (1000x3080mm) Alumunium + Kayu Double unit Rp -
h. Jendela JS2 (1660x4430mm) Alumunium + Kayu Double unit Rp -
6.5 Pekerjaan Finishing Rp -
a. Pengecatan Dinding Interior m2 Rp -
b. Pengecatan Dinding Exterior m2 Rp -
c. Pengecatan Plafond m2 Rp -
6.6 Pekerjaan Penutup Atap Rp -
a. Pemasangan Atap Metal Zincalumn m2 Rp -
b. Pemasangan Bubung Metal Zincalumn m' Rp -
7 Pekerjaan Listrik Rp -
a. Pas. Lampu Pijar +Fitting bh Rp -
b. Pas. Lampu Down light + Fitting bh Rp -
c. Pek. Pas. Stop Kontak (with child protection) setara Philips bh Rp -
d. Pek. Pas. Saklar Tunggal, setara Philips bh Rp -
e. Pek. Pas. Saklar Ganda, setara Philips bh Rp -
f. Pas. Instalasi Titik Api ttk Rp -
8 Pekerjaan Sanitasi dan Saniter Rp -
a. Pas. Closet Duduk + Accessories bh Rp -
b. Pas. Wastafel + Accessories bh Rp -
c. Pas. Kran Dinding bh Rp -
d. Pas. Instalasi Air Bersih ls Rp -
e. Pas. Instalasi Air Kotor ls Rp -
f. Pek. Septictank ls Rp -
J Tangki Air Rp -
1 Pekerjaan Tanah Rp -
a. Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 9.8832 Rp -
b. Pengurugan Tanah Kembali Untuk Konstruksi m3 6.274 Rp -
2 Pekerjaan Beton K-175 Rp -
a. Lantai Kerja m3 0.6572 Rp -
3 Pekerjaan Beton Bertulang K-250 Insitu Rp -
3.1 Pondasi Rp -
a. Pekerjaan Beton K-250 m3 2.952 Rp -
b. Pekerjaan Pembesian kg 342.636 Rp -
c. Pekerjaan Bekisting m2 10.560 Rp -
3.2 Sloof Rp -
a. Pekerjaan Beton K-250 m3 1.171 Rp -
b. Pekerjaan Pembesian kg 136.604 Rp -
c. Pekerjaan Bekisting m2 15.616 Rp -
4 Pekerjaan Baja Rp -
4.1 Pipa Besi Ø2 " kg 236.773 Rp -
4.2 Pipa Besi Ø1 " kg 60.264 Rp -
4.3 L.50.50.6 kg 1007.736 Rp -
4.4 2L.50.50.6 kg 31.453 Rp -
4.5 2L.90.90.7 kg 612.801 Rp -
4.6 L.40.40.4 kg 108.832 Rp -
4.7 Bracing L.40.40.4 kg 69.967 Rp -
4.8 Bracing L.65.65.6 kg 190.775 Rp -
4.9 Bracing L.50.50.6 kg 242.977 Rp -
4.1 Bracing 2L.50.50.6 kg 205.977 Rp -
4.11 Expended Mesh m2 13.148 Rp -

K Lapangan Penumpukan Semenisasi

L Lapangan Penumpukan Terbuka


M Lapangan Parkir
N Gangway dan Pagar BRC
O Lampu PJU dan Taman
P Lansekap
O Marka dan Kanstein
R Pekerjaan Signage
S PEKERJAAN LAIN LAIN
1 Pekerjaan Pembersihan ls 1.00 25,000,000.00 Rp 25,000,000.00
SUBTOTAL 20 Rp 25,000,000.00
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERHUBUNGAN LAUT
KANTOR KESYAHBANDARAN DAN OTORITAS PELABUHAN KELAS II TANJUNG PINANG

RENCANA ANGGARAN BIAYA ( R A B )


#REF!
#REF!

VOLUME HARGA SATUAN JUMLAH HARGA


No. URAIAN PEKERJAAN SATUAN
Rp Rp
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi Peralatan Ls 1.00 720,609,693.75 Rp 720,609,693.75
2 Pengukuran dan Positioning Ls 1.00 113,720,625.00 Rp 113,720,625.00
3 PDA Test Ls 1.00 114,099,693.75 Rp 114,099,693.75
4 Direksi Keet dan Gudang Ls 1.00 189,837,630.00 Rp 189,837,630.00
5 Penerangan dan Keselamatan Kerja Ls 1.00 128,883,375.00 Rp 128,883,375.00
6 Pelaporan dan Dokumentasi Ls 1.00 280,510,875.00 Rp 280,510,875.00
SUBTOTAL I Rp 1,547,661,892.50
II PEKERJAAN PEMATANGAN LAHAN
1 Pekerjaan Pematangan Lahan
1.1 Pembersihan Lahan (Grubbing & Clearing) m2 35000 24,841.12 Rp 869,439,200.00
1.2 Pembersihan Lahan (Stripping, t=1 m) m2 35000 55,496.56 Rp 1,942,379,586.23
SUBTOTAL 2 Rp 2,811,818,786.23
III PERKERASAN JALAN DAN DRAINASE
1 Pekerjaan Jalan dan Drainase m2 7056.000 15,749.00 Rp 111,124,950.53
SUBTOTAL 3 Rp 111,124,950.53
IV FASILITAS BANGUNAN DARAT
A TERMINAL PENUMPANG & KANTIN
1 Pekerjaan Tanah
a. Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 329.57 77,328.00 Rp 25,484,604.39
b. Pekerjaan urugan kembali (backfill) m3 115.35 38,420.00 Rp 4,431,725.04
c. Pekerjaan buangan sisa galian ke disposal m3 16.58 33,235.28 Rp 551,182.02
d. Timbunan Tanah, t=150mm m3 115.70 697,300.00 Rp 80,677,581.14
e. Timbunan Pasir, t=100mm m3 76.98 704,704.00 Rp 54,250,283.40
2 Pekerjaan Pondasi Batu Kali
a. Pondasi Batu kali m3 329.57 1,545,655.50 Rp 509,393,996.17
b. Aanstamping m3 24.49 926,906.30 Rp 22,702,751.01
c. Pasir Urug m3 12.25 765,080.00 Rp 9,369,566.67
3 Pekerjaan Beton K-175
a. Lantai kerja m3 70.46 1,880,108.42 Rp 132,480,061.22
4 Pekerjaan Beton Bertulang K-250 Insitu
4.1 Sloof
a. Pekerjaan Beton K-250 m3 329.57 1,388,761.27 Rp 457,687,144.73
b. Pekerjaan Pembesian kg 992.75 18,824.68 Rp 18,688,221.14
c. Pekerjaan Bekisting m2 39.71 378,010.22 Rp 15,010,804.28
4.2 Kolom
a. Pekerjaan Beton K-250 m3 329.57 1,388,761.27 Rp 457,687,144.73
b. Pekerjaan Pembesian kg 964.54 18,824.68 Rp 18,157,189.72
c. Pekerjaan Bekisting m2 34.45 378,010.22 Rp 13,021,667.65
4.3 Balok
a. Pekerjaan Beton K-250 m3 329.57 1,388,761.27 Rp 457,687,144.73
b. Pekerjaan Pembesian kg 344.70 18,824.68 Rp 6,488,795.47
c. Pekerjaan Bekisting m2 13.26 378,010.22 Rp 5,011,488.57
4.4 Ring Balok
a. Pekerjaan Beton K-250 m3 329.57 1,388,761.27 Rp 457,687,144.73
b. Pekerjaan Pembesian kg 840.85 18,824.68 Rp 15,828,821.19
c. Pekerjaan Bekisting m2 33.63 378,010.22 Rp 12,714,069.20
4.5 Dak Atap
a. Pekerjaan Beton K-250 m3 329.57 1,388,761.27 Rp 457,687,144.73
b. Pekerjaan Pembesian kg 840.85 18,824.68 Rp 15,828,821.19
c. Pekerjaan Bekisting m2 33.63 378,010.22 Rp 12,714,069.20
5 Pekerjaan Rangka Atap Baja Ringan
a. Pemasangan Rangka Baja ringan m2 201.50 350,000.00 Rp 70,526,648.65
6 Pekerjaan Arsitektur
6.1 Pekerjaan Dinding
a. Pekerjaan Dinding 1/2 Bata m2 329.57 184,320.00 Rp 60,745,425.73
b. Plesteran m2 1769.14 79,088.00 Rp 139,917,896.11
c. Acian m2 1769.14 42,288.00 Rp 74,813,473.48
6.2 Pekerjaan Lantai
a. Keramik 600x600mm m2 329.57 325,000.00 Rp 107,108,633.69
b. Keramik 400x400mm m2 329.57 300,000.00 Rp 98,869,508.02
c. Keramik non slip 600x600mm m2 115.59 350,000.00 Rp 40,457,011.42
d. Keramik 200x400mm m2 78.51 350,000.00 Rp 27,479,220.06
6.3 Pekerjaan Plafon
a. Plafon Gypsum 9 mm m2 863.44 153,000.00 Rp 132,106,486.90
6.4 Pekerjaan Pintu dan Jendela
a. Pintu P1 (900x2300mm) unit 9.00 3,300,000.00 Rp 29,700,000.00
b. Pintu P2 (1000x2400mm) unit 1.00 3,500,000.00 Rp 3,500,000.00
c. Pintu P3 Pintu & Jendelah Alumunium unit 3.00 5,840,000.00 Rp 17,520,000.00
d. Pintu P4 (Pintu dan Jendela) unit 1.00 4,500,000.00 Rp 4,500,000.00
e. Jendela J1 Alumunium unit 11.00 2,550,000.00 Rp 28,050,000.00
f. Jendela J2 Alumunium unit 1.00 2,500,000.00 Rp 2,500,000.00
g. Jendela J3 Alumunium unit 12.00 800,000.00 Rp 9,600,000.00
h. Jendela J4 Alumunium unit 9.00 500,000.00 Rp 4,500,000.00
6.5 Pekerjaan Finishing
a. Pengecatan Dinding Interior m2 884.57 45,000.00 Rp 39,805,693.18
b. Pengecatan Dinding Exterior m2 884.57 55,000.00 Rp 48,651,402.78
c. Pengecatan Plafond m2 863.44 45,000.00 Rp 38,854,849.09
6.6 Pekerjaan Penutup Atap
a. Pemasangan Atap Genteng m2 201.50 180,000.00 Rp 36,270,847.88
b. Pemasangan Bubung m' 55.14 200,000.00 Rp 11,028,343.45
c. List Plank m' 116.84 200,000.00 Rp 23,368,670.86
7 Pekerjaan listrik
a. Pas. Lampu Pijar +Fitting bh 13 125,500.00 Rp 1,571,125.82
b. Pas. Lampu Down light + Fitting bh 100 156,000.00 Rp 15,623,625.66
c. Pek. Pas. Stop Kontak (with child protection) setara Philips bh 22 25,000.00 Rp 542,487.00
d. Pek. Pas. Saklar Tunggal, setara Philips bh 21 25,000.00 Rp 521,622.12
e. Pek. Pas. Saklar Ganda, setara Philips bh 29 45,000.00 Rp 1,314,487.74
f. Pas. Instalasi Titik Api ttk 184.45 250,000.00 Rp 46,111,395.18
8 Pekerjaan Sanitasi dan saniter
a. Pas. Closet Duduk + Accessories bh 7 5,316,800.00 Rp 35,499,014.06
b. Pas. Wastafel + Accessories bh 5 3,457,340.00 Rp 17,312,880.11
c. Pas. Kran Dinding bh 7 175,000.00 Rp 1,168,433.54
d. Pas. Instalasi Air Bersih ls 1.00 10,500,000.00 Rp 10,500,000.00
e. Pas. Instalasi Air Kotor ls 1.00 8,579,300.00 Rp 8,579,300.00
f. Pek. Septictank ls 1.00 17,558,000.00 Rp 17,558,000.00
SUBTOTAL 4 Rp 4,467,417,904.86
B KANTOR PELABUHAN
1 Pekerjaan Tanah
a. Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 33.75 89,100.00 Rp 3,007,125.00
b. Pekerjaan urugan kembali (backfill) m3 16.575 44,000.00 Rp 729,300.00
c. Pekerjaan buangan sisa galian ke disposal m3 17.175 38,126.00 Rp 654,814.05
2 Pekerjaan Pondasi Tapak
a. Lantai Kerja m3 1.92 1,355,172.42 Rp 2,601,931.04
3 Pekerjaan Beton K-175
a. Lantai Kerja m3 12.626 1,355,172.42 Rp 17,110,666.11
4 Pekerjaan Beton Bertulang K-250 Insitu Rp -
4.1 Pondasi Rp -
a. Pekerjaan Beton K-250 m3 17.175 2,219,663.58 Rp 38,122,722.03
b. Pekerjaan Pembesian kg 901.878 15,749.00 Rp 14,203,677.46
c. Pekerjaan Bekisting m2 51.000 299,435.08 Rp 15,271,189.16
4.2 Sloof Rp -
a. Pekerjaan Beton K-250 m3 5.850 2,219,663.58 Rp 12,985,031.96
b. Pekerjaan Pembesian kg 915.161 15,749.00 14,203,677.46
c. Pekerjaan Bekisting m2 97.500 299,435.08 15,271,189.16
4.3 Kolom `
a. Pekerjaan Beton K-250 m3 2.609 2,219,663.58 Rp 5,790,880.32
b. Pekerjaan Pembesian kg 698.626 15,749.00 Rp 11,002,663.88
c. Pekerjaan Bekisting m2 59.632 299,435.08 Rp 17,855,912.78
4.4 Ring Balok Rp -
a. Pekerjaan Beton K-250 m3 4.950 2,219,663.58 Rp 10,987,334.73
b. Pekerjaan Pembesian kg 774.371 15,749.00 Rp 12,195,575.90
c. Pekerjaan Bekisting m2 82.500 299,435.08 Rp 24,703,394.22
4.5 Pelat Lantai Rp -
a. Pekerjaan Beton K-250 m3 30.303 2,219,663.58 Rp 67,262,152.58
b. Pekerjaan Pembesian kg 3787.857 15,749.00 Rp 59,654,969.31
c. Pekerjaan Bekisting m2 252.524 299,435.08 Rp 75,614,492.11
5 Pekerjaan Rangka Atap Baja Ringan Rp -
5.1 Pemasangan Rangka Baja ringan m2 284.76 350,000.00 Rp 99,666,000.00
6 Pekerjaan Arsitektur Rp -
6.1 Pekerjaan Dinding Rp -
a. Pekerjaan Dinding 1/2 Bata m2 294.722 257,191.72 Rp 75,800,059.55
b. Plesteran m2 589.444 52,701.00 Rp 31,064,288.24
c. Acian m2 589.444 48,328.50 Rp 28,486,944.35
6.2 Pekerjaan Lantai Rp -
a. Keramik Glossy 600x600mm m2 188.795 492,353.28 Rp 92,953,838.24
b. Keramik non slip 400x400mm m2 11.205 172,396.57 Rp 1,931,703.61
c. Lantai Plesteran K-125 m2 103.84 1,300,000.00 Rp 134,992,000.00
6.3 Pekerjaan Plafon Rp -
a. Plafon Gypsum 9 mm m2 293.8795 153,000.00 Rp 44,963,563.50
6.4 Pekerjaan Pintu dan Jendela Rp -
a. Pintu P1 (1800x2600 mm) Alumunium + Kaca unit 1 3,300,000.00 Rp 3,300,000.00
b. Pintu P2 (2200x2600mm) Alumunium + Kaca unit 1 3,500,000.00 Rp 3,500,000.00
c. Pintu P3 (900x2600mm) Alumunium + Kaca unit 8 2,500,000.00 Rp 20,000,000.00
d. Pintu P4 (700x2200mm) Alumunium unit 4 2,500,000.00 Rp 10,000,000.00
e. Jendela J1 (4740x2502mm) Alumunium + Kaca unit 1 3,500,000.00 Rp 3,500,000.00
f. Jendela J2 (1700x1600mm) Alumunium + Kaca unit 5 2,500,000.00 Rp 12,500,000.00
g. Jendela J3 (1700x1600mm) Alumunium + Kaca unit 2 2,500,000.00 Rp 5,000,000.00
h. Jendela J4 (950x600mm) Alumunium + Kaca unit 6 500,000.00 Rp 3,000,000.00
6.5 Pekerjaan Finishing Rp -
a. Pengecatan Dinding Interior m2 510.623 45,000.00 Rp 22,978,035.00
b. Pengecatan Dinding Exterior m2 195.339 55,000.00 Rp 10,743,645.00
c. Pengecatan Plafond m2 293.8795 45,000.00 Rp 13,224,577.50
6.6 Pekerjaan Penutup Atap Rp -
a. Pemasangan Atap Genteng m2 130.522 180,000.00 Rp 23,493,960.00
b. Pemasangan Bubung Metal Zincalumn m' 39.348 200,000.00 Rp 7,869,600.00
7 Pekerjaan Listrik Rp -
a. Pas. Lampu LED T8 LED 16W bh 30 125,500.00 Rp 3,765,000.00
b. Pas. Lampu Down light + Fitting bh 9 156,000.00 Rp 1,404,000.00
c. Pek. Pas. Stop Kontak bh 11 25,000.00 Rp 275,000.00
d. Pek. Pas. Saklar Tunggal, setara Philips bh 5 25,000.00 Rp 125,000.00
e. Pek. Pas. Saklar Ganda, setara Philips bh 4 45,000.00 Rp 180,000.00
f. Pas. Lampu Dinding Spotlight Outdoor bh 6 140,000.00 Rp 840,000.00
8 Pekerjaan Sanitasi dan Saniter Rp -
a. Pas. Closet Duduk + Accessories bh 4 5,316,800.00 Rp 21,267,200.00
b. Pas. Wastafel + Accessories bh 4 3,457,340.00 Rp 13,829,360.00
c. Pas. Kran Dinding bh 4 175,000.00 Rp 700,000.00
d. Pas. Instalasi Air Bersih ls 1 10,500,000.00 Rp 10,500,000.00
e. Pas. Instalasi Air Kotor ls 1 8,579,300.00 Rp 8,579,300.00
f. Pek. Septictank ls 1 17,558,000.00 Rp 17,558,000.00
SUBTOTAL 5 Rp 1,147,219,774.26
C KANTOR KSOP Rp -
1 Pekerjaan Tanah
a. Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 105 89,100.00 Rp 9,355,500.00
b. Pekerjaan urugan kembali (backfill) m3 50.356 44,000.00 Rp 2,215,675.00
c. Pekerjaan buangan sisa galian ke disposal m3 54.644 38,126.00 Rp 2,083,347.61
2 Pekerjaan Pondasi Tapak
a. Lantai Kerja m3 5.8675 1,355,172.42 Rp 7,951,474.16
3 Pekerjaan Beton K-175
a. Lantai Kerja m3 39.484375 1,355,172.42 Rp 53,508,135.89
4 Pekerjaan Beton Bertulang K-250 Insitu Rp -
4.1 Pondasi Rp -
a. Pekerjaan Beton K-250 m3 54.644 2,219,663.58 Rp 121,290,741.90
b. Pekerjaan Pembesian kg 3281.145 15,749.00 Rp 51,674,754.38
c. Pekerjaan Bekisting m2 144.500 299,435.08 Rp 43,268,369.27
4.2 Sloof
a. Pekerjaan Beton K-250 m3 43.660 2,219,663.58 Rp 96,910,512.02
b. Pekerjaan Pembesian kg 5209.266 15,749.00 Rp 82,040,738.67
c. Pekerjaan Bekisting m2 448.950 299,435.08 Rp 134,431,379.83
4.3 Kolom `
a. Pekerjaan Beton K-250 m3 23.232 2,219,663.58 Rp 51,567,779.27
b. Pekerjaan Pembesian kg 6895.562 15,749.00 Rp 108,598,213.55
c. Pekerjaan Bekisting m2 406.020 299,435.08 Rp 121,576,631.78
4.4 Balok Rp -
a. Pekerjaan Beton K-250 m3 44.020 2,219,663.58 Rp 97,709,590.91
b. Pekerjaan Pembesian kg 5311.161 15,749.00 Rp 83,645,481.85
c. Pekerjaan Bekisting m2 459.700 299,435.08 Rp 137,650,306.96
4.4 Ring Balok Rp -
a. Pekerjaan Beton K-250 m3 44.020 2,219,663.58 Rp 97,709,590.91
b. Pekerjaan Pembesian kg 5311.161 15,749.00 Rp 83,645,481.85
c. Pekerjaan Bekisting m2 459.700 299,435.08 Rp 137,650,306.96
4.5 Pelat Lantai Rp -
a. Pekerjaan Beton K-250 m3 180.659 2,219,663.58 Rp 401,003,035.57
b. Pekerjaan Pembesian kg 22582.422 15,749.00 Rp 355,650,583.02
c. Pekerjaan Bekisting m2 1389.688 299,435.08 Rp 416,121,189.80
5 Pekerjaan Rangka Atap Baja Ringan Rp -
5.1 Pemasangan Rangka Baja ringan m2 759 350,000.00 Rp 265,650,000.00
6 Pekerjaan Arsitektur Rp -
6.1 Pekerjaan Dinding Rp -
a. Pekerjaan Dinding 1/2 Bata m2 1701.8 257,191.72 Rp 437,688,877.48
b. Plesteran m2 3403.6 52,701.00 Rp 179,373,123.60
c. Acian m2 3403.6 48,328.50 Rp 164,490,882.60
d. Keramik Dinding 200x400mm m2 61.515 Rp -
6.2 Pekerjaan Lantai Rp -
a. Keramik Glossy 600x600 mm m2 1175.15 492,353.28 Rp 578,588,961.63
b. Keramik non slip 400x400mm m2 24.85 172,396.57 Rp 4,284,054.87
6.3 Pekerjaan Plafon Rp -
a. Plafon Gypsum 9 mm m2 1359 153,000.00 Rp 207,927,000.00
6.4 Pekerjaan Pintu dan Jendela Rp -
a. Pintu P1 (2200x2980mm) Kayu Double Multi Lapis HPL + Kaca unit 8 3,500,000.00 Rp 28,000,000.00

b. unit 2,500,000.00 Rp 25,000,000.00


Pintu P2 (900x2250mm) Alumunium + Kayu Double Multi Lapis HPL 10
c. Pintu P3 (900x2250mm) Alumunium unit 12 2,500,000.00 Rp 30,000,000.00
d. PJ (2525x2200mm) Alumunium + Kayu Double + Kaca unit 6 3,300,000.00 Rp 19,800,000.00
e. Jendela J2 (1700x1600mm) Alumunium + Kaca unit 47 2,500,000.00 Rp 117,500,000.00
f. Jendela J3 (870x600mm) Alumunium +Kaca unit 6 Rp -
g. Jendela JS1 (1000x3080mm) Alumunium + Kayu Double unit 6 Rp -
h. Jendela JS2 (1660x4430mm) Alumunium + Kayu Double unit 2 2,500,000.00 Rp 5,000,000.00
6.5 Pekerjaan Finishing Rp -
a. Pengecatan Dinding Interior m2 2733.6 45,000.00 Rp 123,012,000.00
b. Pengecatan Dinding Exterior m2 670 55,000.00 Rp 36,850,000.00
c. Pengecatan Plafond m2 1359 45,000.00 Rp 61,155,000.00
6.6 Pekerjaan Penutup Atap Rp -
a. Pemasangan Atap Genteng m2 431.396 180,000.00 Rp 77,651,280.00
b. Pemasangan Bubung m' 48.656 200,000.00 Rp 9,731,200.00
7 Pekerjaan Listrik Rp -
a. Pas. Lampu LED T8 LED 16W bh 92 125,500.00 Rp 11,546,000.00
b. Pas. Lampu Down light + Fitting bh 36 156,000.00 Rp 5,616,000.00
c. Pek. Pas. Stop Kontak bh 50 25,000.00 Rp 1,250,000.00
d. Pek. Pas. Saklar Tunggal, setara Philips bh 14 25,000.00 Rp 350,000.00
e. Pek. Pas. Saklar Ganda, setara Philips bh 15 45,000.00 Rp 675,000.00
f. Pas. Lampu Dinding Spotlight Outdoor ttk 28 140,000.00 Rp 3,920,000.00
8 Pekerjaan Sanitasi dan Saniter Rp -
a. Pas. Closet Duduk + Accessories bh 10 5,316,800.00 Rp 53,168,000.00
b. Pas. Wastafel + Accessories bh 8 3,457,340.00 Rp 27,658,720.00
c. Urinor bh 6 3,368,000.00 Rp 20,208,000.00
d. Pas. Instalasi Air Bersih ls 1 10,500,000.00 Rp 10,500,000.00
e. Pas. Instalasi Air Kotor ls 1 8,579,300.00 Rp 8,579,300.00
f. Pek. Septictank ls 1 17,558,000.00 Rp 17,558,000.00
SUBTOTAL 6 Rp 5,229,990,221.35
D Gudang Pelabuhan
1 Pekerjaan Tanah
a. Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 20 89,100.00 Rp 1,782,000.00
b. Pekerjaan urugan kembali (backfill) m3 11.250 44,000.00 Rp 495,000.00
c. Pekerjaan buangan sisa galian ke disposal m3 8.750 38,126.00 Rp 333,602.50
2 Pekerjaan Pondasi Tapak Rp -
a. Lantai Kerja m3 1.210 Rp -
3 Pekerjaan Beton K-175 Rp -
a. Lantai Kerja m3 37.4525 Rp -
4 Pekerjaan Beton Bertulang K-250 Insitu Rp -
4.1 Pondasi Rp -
a. Pekerjaan Beton K-250 m3 8.750 Rp -
b. Pekerjaan Pembesian kg 866.291 Rp -
c. Pekerjaan Bekisting m2 2.840 Rp -
4.2 Sloof Rp -
a. Pekerjaan Beton K-250 m3 10.688 Rp -
b. Pekerjaan Pembesian kg 1147.621 Rp -
c. Pekerjaan Bekisting m2 109.250 Rp -
4.3 Kolom Rp -
a. Pekerjaan Beton K-250 m3 Rp -
b. Pekerjaan Pembesian kg Rp -
c. Pekerjaan Bekisting m2 Rp -
4.4 Ring Balok Rp -
a. Pekerjaan Beton K-250 m3 10.688 Rp -
b. Pekerjaan Pembesian kg 1147.621 Rp -
c. Pekerjaan Bekisting m2 109.250 Rp -
4.5 Pelat Lantai Rp -
a. Pekerjaan Beton K-250 m3 Rp -
b. Pekerjaan Pembesian kg Rp -
c. Pekerjaan Bekisting m2 Rp -
5 Pekerjaan Rangka Atap Rp -
5.1 Purlin P1 CNP.100x50x20x2.3 kg 674.4 m #VALUE!
5.2 Rafter R1 IWF.200.100.5,5.8S kg 151.92 m #VALUE!
5.3 Sagrod SG Dimeter 19 kg 141.776 m #VALUE!
5.4 Trekstang Diameter 10 436.8 m #VALUE!
6 Pekerjaan Arsitektur Rp -
6.1 Pekerjaan Dinding Rp -
a. Pekerjaan Dinding 1/2 Bata m2 660 Rp -
b. Plesteran m2 1320 Rp -
c. Acian m2 1320 Rp -
6.2 Pekerjaan Lantai Rp -
a. Plesteran K-125 m2 749.05 Rp -
6.3 Pekerjaan Plafon Rp -
a. Plafon Gypsum 9 mm m2 749.05 Rp -
6.4 Pekerjaan Pintu dan Jendela Rp -
a. Pintu P1 (4000x4000) Plat Besi unit 2 Rp -
b. Jendela J1 (2200x820mm) unit 12 Rp -
c. Jendela J2 (2000x745mm) Alumunium unit 4 Rp -
6.5 Pekerjaan Finishing Rp -
a. Pengecatan Dinding Interior m2 660 Rp -
b. Pengecatan Dinding Exterior m2 660 Rp -
c. Pengecatan Plafond m2 749.05 Rp -
6.6 Pekerjaan Penutup Atap Rp -
a. Pemasangan Atap Metal Zincalumn m2 362.92 Rp -
b. Pemasangan Bubung Metal Zincalumn m' 42.2 Rp -
7 Pekerjaan Listrik Rp -
a. Pas. Lampu LED T8 LED 16W bh 24 Rp -
b, Pek. Pas. Stop Kontak bh 6 Rp -
c. Pek. Pas. Saklar Tunggal bh 3 Rp -
e. Pas. Lampu Spotlight ttk 6 Rp -
E Kantor Imigrasi, Karantina, K3, Bea Cukai Rp -
1 Pekerjaan Tanah Rp -
a. Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 30.72 Rp -
b. Pekerjaan urugan kembali (backfill) m3 15.300 Rp -
c. Pekerjaan buangan sisa galian ke disposal m3 15.420 Rp -
2 Pekerjaan Pondasi Tapak Rp -
a. Lantai Kerja m3 1.536 Rp -
3 Pekerjaan Beton K-175 Rp -
a. Lantai Kerja m3 Rp -
4 Pekerjaan Beton Bertulang K-250 Insitu Rp -
4.1 Pondasi Rp -
a. Pekerjaan Beton K-250 m3 13.884 Rp -
b. Pekerjaan Pembesian kg 790.447 Rp -
c. Pekerjaan Bekisting m2 43.680 Rp -
4.2 Sloof Rp -
a. Pekerjaan Beton K-250 m3 2.610 Rp -
b. Pekerjaan Pembesian kg 852.367 Rp -
c. Pekerjaan Bekisting m2 43.500 Rp -
4.3 Kolom Rp -
a. Pekerjaan Beton K-250 m3 1.710 Rp -
b. Pekerjaan Pembesian kg 151.348 Rp -
c. Pekerjaan Bekisting m2 36.000 Rp -
4.4 Ring Balok Rp -
a. Pekerjaan Beton K-250 m3 2.610 Rp -
b. Pekerjaan Pembesian kg 852.367 Rp -
c. Pekerjaan Bekisting m2 43.500 Rp -
4.5 Pelat Lantai Rp -
a. Pekerjaan Beton K-250 m3 16.031 Rp -
b. Pekerjaan Pembesian kg Rp -
c. Pekerjaan Bekisting m2 106.875 Rp -
5 Pekerjaan Rangka Atap Baja Ringan Rp -
5.1 Pemasangan Rangka Baja ringan IWF 150x75x5x7 m2 79.326 Rp -
5.2 Trekstang Diameter 12 m' 81.84 Rp -
6 Pekerjaan Arsitektur Rp -
6.1 Pekerjaan Dinding Rp -
a. Pekerjaan Dinding 1/2 Bata m2 159 Rp -
b. Plesteran m2 318 Rp -
c. Acian m2 318 Rp -
d. Keramik Dinding m2 42.39 Rp -
e. Kaca 560 x 840 m2 4.704 Rp -
6.2 Pekerjaan Lantai Rp -
a. Keramik Glossy 600x600mm m2 60 Rp -
b. Keramik non slip 400x400mm m2 15 Rp -
6.3 Pekerjaan Plafon Rp -
a. Plafon Gypsum 9 mm m2 14.75322 Rp -
6.4 Pekerjaan Pintu dan Jendela Rp -
a. Pintu P1 (900x2600mm) Alumunium + Kaca unit 5 Rp -
b. Pintu P2 (700x2200mm) Alumunium unit 2 Rp -
c,, Jendela J1 (1700x2000mm) Alumunium + Kaca unit 4 Rp -
d. Jendela J2 (870x600mm) Alumunium +Kaca unit 6 Rp -
6.5 Pekerjaan Finishing Rp -
a. Pengecatan Dinding Interior m2 228 Rp -
b. Pengecatan Dinding Exterior m2 120 Rp -
c. Pengecatan Plafond m2 14.75322 Rp -
6.6 Pekerjaan Penutup Atap Rp -
a. Pemasangan Atap Genteng m2 79.326 Rp -
b. Pemasangan Bubung Metal Zincalumn m' 26.048 Rp -
7 Pekerjaan Listrik Rp -
a. Pas. Lampu LED T8 LED 16W bh 12 Rp -
b. Pas. Lampu Down light + Fitting bh 6 Rp -
c. Pek. Pas. Stop Kontak bh 8 Rp -
d. Pek. Pas. Saklar Tunggal bh 5 Rp -
e. Pek. Pas. Saklar Ganda, setara Philips bh 1 Rp -
f. Pas. Lampu Spotlight ttk 5 Rp -
8 Pekerjaan Sanitasi dan Saniter Rp -
a. Pas. Closet Duduk + Accessories bh 2 Rp -
b. Pas. Wastafel + Accessories bh 1 Rp -
c. Urinoir bh 3 Rp -
e. Pas. Instalasi Air Bersih ls 1 Rp -
f. Pas. Instalasi Air Kotor ls 1 Rp -
F Pos Jaga Rp -
1 Pekerjaan Tanah Rp -
a. Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 11.2 Rp -
b. Pekerjaan urugan kembali (backfill) m3 4.340 Rp -
c. Pekerjaan buangan sisa galian ke disposal m3 6.860 Rp -
2 Pekerjaan Pondasi Batu Kali Rp -
a. Pondasi Batu Kali m3 4.2 Rp -
b. Pasir Urug m3 0.700 Rp -
3 Pekerjaan Beton K-175 Rp -
a. Lantai Kerja m3 0.7 Rp -
4 Pekerjaan Beton Bertulang K-250 Insitu Rp -
4.1 Sloof Rp -
a. Pekerjaan Beton K-250 m3 1.260 Rp -
b. Pekerjaan Pembesian kg 390.035 Rp -
c. Pekerjaan Bekisting m2 21.000 Rp -
4.2 Kolom Rp -
a. Pekerjaan Beton K-250 m3 0.792 Rp -
b. Pekerjaan Pembesian kg 167.741 Rp -
c. Pekerjaan Bekisting m2 15.840 Rp -
4.3 Ring Balok Rp -
a. Pekerjaan Beton K-250 m3 1.125 Rp -
b. Pekerjaan Pembesian kg 348.246 Rp -
c. Pekerjaan Bekisting m2 18.750 Rp -
4.4 Pelat Lantai Rp -
a. Pekerjaan Beton K-250 m3 3.750 Rp -
b. Pekerjaan Pembesian kg Rp -
c. Pekerjaan Bekisting m2 25.000 Rp -
5 Pekerjaan Rangka Atap Baja Ringan Rp -
5.1 Pemasangan Rangka Baja ringan m2 137.251036 Rp -
5.2 Trekstang Diameter 12 m 19.52 Rp -
6 Pekerjaan Arsitektur Rp -
6.1 Pekerjaan Dinding Rp -
a. Pekerjaan Dinding 1/2 Bata m2 Rp -
b. Plesteran m2 84 Rp -
c. Acian m2 168 Rp -
6.2 Pekerjaan Lantai 168 Rp -
a. Keramik Non Glossy 600x600mm m2 21.4 Rp -
b. Keramik non slip 400x400mm m2 3.6 Rp -
6.3 Pekerjaan Plafon Rp -
a. Plafon Gypsum 9 mm m2 65.61 Rp -
6.4 Pekerjaan Pintu dan Jendela Rp -
a. Pintu P1 (900x2600mm) Alumunium + Kaca unit 2 Rp -
b. Jendela J2 (1700x2000mm) Alumunium + Kaca unit 1 Rp -
c. Jendela J3 (870x600mm) Alumunium +Kaca unit 1 Rp -
6.5 Pekerjaan Finishing m2 Rp -
a. Pengecatan Dinding Interior m2 108 Rp -
b. Pengecatan Dinding Exterior m2 60 Rp -
c. Pengecatan Plafond m2 65.61 Rp -
d. Ukiran Kayu unit 3.84 Rp -
6.6 Pekerjaan Penutup Atap Rp -
a. Pemasangan Atap Genteng m2 137.251036 Rp -
b. Pemasangan Bubung Metal Zincalumn m' 17.804 Rp -
7 Pekerjaan Listrik Rp -
a. Pas. Lampu LED T8 LED 16W bh 2 Rp -
b. Pas. Lampu Down light + Fitting bh 5 Rp -
c. Pek. Pas. Stop Kontak bh 2 Rp -
d. Pek. Pas. Saklar Tunggal bh 1 Rp -
e. Pek. Pas. Saklar Ganda, setara Philips bh 2 Rp -
f. Pas. Lampu Spotlight ttk 4 Rp -
8 Pekerjaan Sanitasi dan Saniter Rp -
a. Pas. Closet Duduk + Accessories bh 1 Rp -
c. Pas. Kran Dinding bh 1 Rp -
d. Talang Air m' 32.4 Rp -
d. Pas. Instalasi Air Bersih ls 1 Rp -
e. Pas. Instalasi Air Kotor ls 1 Rp -
G Mushola Rp -
1 Pekerjaan Tanah Rp -
a. Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 8 Rp -
b. Pekerjaan urugan kembali (backfill) m3 2.125 Rp -
c. Pekerjaan buangan sisa galian ke disposal m3 5.875 Rp -
2 Pekerjaan Pondasi Batu Kali Rp -
a. Pondasi Batu kali m3 3 Rp -
b. Pasir Urug m3 0.500 Rp -
3 Pekerjaan Beton K-175 Rp -
a. Lantai Kerja m3 1.25 Rp -
4 Pekerjaan Beton Bertulang K-250 Insitu Rp -
4.1 Sloof Rp -
a. Pekerjaan Beton K-250 m3 1.125 Rp -
b. Pekerjaan Pembesian kg 348.246 Rp -
c. Pekerjaan Bekisting m2 18.750 Rp -
4.2 Kolom Rp -
a. Pekerjaan Beton K-250 m3 0.528 Rp -
b. Pekerjaan Pembesian kg 111.827 Rp -
c. Pekerjaan Bekisting m2 10.560 Rp -
4.3 Ring Balok Rp -
a. Pekerjaan Beton K-250 m3 1.125 Rp -
b. Pekerjaan Pembesian kg 348.246 Rp -
c. Pekerjaan Bekisting m2 18.750 Rp -
4.4 Pelat Lantai Rp -
a. Pekerjaan Beton K-250 m3 4.256 Rp -
b. Pekerjaan Pembesian kg Rp -
c. Pekerjaan Bekisting m2 25.000 Rp -
4.5 Lisplank Rp -
a. Lisplang Kayu m2 3.348 Rp -
5 Pekerjaan Rangka Atap Baja Ringan Rp -
5.1 Pemasangan Rangka Baja ringan IWF 150x75x5x7 m2 137.251036 Rp -
5.2 Trekstang Diameter 12 m 19.52 Rp -
6 Pekerjaan Arsitektur Rp -
6.1 Pekerjaan Dinding Rp -
a. Pekerjaan Dinding 1/2 Bata m2 62.575 Rp -
b. Plesteran m2 125.15 Rp -
c. Acian m2 125.15 Rp -
d. Keramik Dinding 5.15 Rp -
6.2 Pekerjaan Lantai Rp -
a. Keramik Glossy 600x600mm m2 26.58625 Rp -
b. Keramik Non Slip 400x400mm m2 1.789 Rp -
6.3 Pekerjaan Plafon Rp -
a. Plafon Gypsum 9 mm m2 65.61 Rp -
6.4 Pekerjaan Pintu dan Jendela Rp -
a. Jendela J7 (1438X1819mm) Kayu Double Multi Lapis HPL + Kaca unit 4 Rp -
b. Pintu (2763x1325)mm unit 1 Rp -
6.5 Pekerjaan Finishing Rp -
a. Pengecatan Dinding Interior m2 60 Rp -
b. Pengecatan Dinding Exterior m2 60 Rp -
c. Pengecatan Plafond m2 65.61 Rp -
6.6 Pekerjaan Penutup Atap Rp -
a. Pemasangan Atap Genteng m2 137.251036 Rp -
b. Mahkota Plat Steel 3mm bh 1 Rp -
c. Pemasangan Bubung Metal Zincalumn m' 17.804 Rp -
7 Pekerjaan Listrik Rp -
a. Pas. Lampu LED T8 LED 16W bh 3 Rp -
b. Pas. Lampu Down light + Fitting bh 12 Rp -
c. Pek. Pas. Stop Kontak bh 2 Rp -
d. Pek. Pas. Saklar Ganda, setara Philips bh 2 Rp -
8 Pekerjaan Sanitasi dan Saniter Rp -
a. Talang Air m 32.4 Rp -
b. Pas. Kran Dinding bh 3 Rp -
c. Pas. Instalasi Air Bersih ls 1 Rp -
d. Pas. Instalasi Air Kotor ls 1 Rp -
H Rumah Genset Rp -
1 Pekerjaan Tanah Rp -
a. Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 Rp -
b. Pekerjaan urugan kembali (backfill) m3 Rp -
c. Pekerjaan buangan sisa galian ke disposal m3 Rp -
2 Pekerjaan Pondasi Tapak Rp -
a. Lantai Kerja m3 Rp -
3 Pekerjaan Beton K-175 Rp -
a. Lantai Kerja m3 Rp -
4 Pekerjaan Beton Bertulang K-250 Insitu Rp -
4.1 Pondasi Rp -
a. Pekerjaan Beton K-250 m3 Rp -
b. Pekerjaan Pembesian kg Rp -
c. Pekerjaan Bekisting m2 Rp -
4.2 Sloof Rp -
a. Pekerjaan Beton K-250 m3 Rp -
b. Pekerjaan Pembesian kg Rp -
c. Pekerjaan Bekisting m2 Rp -
4.3 Kolom Rp -
a. Pekerjaan Beton K-250 m3 Rp -
b. Pekerjaan Pembesian kg Rp -
c. Pekerjaan Bekisting m2 Rp -
4.4 Balok Rp -
a. Pekerjaan Beton K-250 m3 Rp -
b. Pekerjaan Pembesian kg Rp -
c. Pekerjaan Bekisting m2 Rp -
4.4 Ring Balok Rp -
a. Pekerjaan Beton K-250 m3 Rp -
b. Pekerjaan Pembesian kg Rp -
c. Pekerjaan Bekisting m2 Rp -
4.5 Pelat Lantai Rp -
a. Pekerjaan Beton K-250 m3 Rp -
b. Pekerjaan Pembesian kg Rp -
c. Pekerjaan Bekisting m2 Rp -
4.6 Lisplank Rp -
a. Pekerjaan Beton K-250 m3 Rp -
b. Pekerjaan Pembesian kg Rp -
c. Pekerjaan Bekisting m2 Rp -
5 Pekerjaan Rangka Atap Baja Ringan Rp -
5.1 Pemasangan Rangka Baja ringan m2 Rp -
6 Pekerjaan Arsitektur Rp -
6.1 Pekerjaan Dinding Rp -
a. Pekerjaan Dinding 1/2 Bata m2 Rp -
b. Plesteran m2 Rp -
c. Acian m2 Rp -
6.2 Pekerjaan Lantai Rp -
a. Keramik 400x400mm m2 Rp -
6.3 Pekerjaan Plafon Rp -
a. Plafon Gypsum 9 mm m2 Rp -
6.4 Pekerjaan Pintu dan Jendela Rp -
a. Pintu P1 (2200x2980mm) Kayu Double Multi Lapis HPL + Kaca unit Rp -

b. unit Rp -
Pintu P2 (900x2250mm) Alumunium + Kayu Double Multi Lapis HPL
c. Pintu P3 (900x2250mm) Alumunium unit Rp -
d. PJ (2525x2200mm) Alumunium + Kayu Double + Kaca unit Rp -
e. Jendela J2 (1700x1600mm) Alumunium + Kaca unit Rp -
f. Jendela J3 (870x600mm) Alumunium +Kaca unit Rp -
g. Jendela JS1 (1000x3080mm) Alumunium + Kayu Double unit Rp -
h. Jendela JS2 (1660x4430mm) Alumunium + Kayu Double unit Rp -
6.5 Pekerjaan Finishing Rp -
a. Pengecatan Dinding Interior m2 Rp -
b. Pengecatan Dinding Exterior m2 Rp -
c. Pengecatan Plafond m2 Rp -
6.6 Pekerjaan Penutup Atap Rp -
a. Pemasangan Atap Metal Zincalumn m2 Rp -
b. Pemasangan Bubung Metal Zincalumn m' Rp -
7 Pekerjaan Listrik Rp -
a. Pas. Lampu Pijar +Fitting bh Rp -
b. Pas. Lampu Down light + Fitting bh Rp -
c. Pek. Pas. Stop Kontak (with child protection) setara Philips bh Rp -
d. Pek. Pas. Saklar Tunggal, setara Philips bh Rp -
e. Pek. Pas. Saklar Ganda, setara Philips bh Rp -
f. Pas. Instalasi Titik Api ttk Rp -
8 Pekerjaan Sanitasi dan Saniter Rp -
a. Pas. Closet Duduk + Accessories bh Rp -
b. Pas. Wastafel + Accessories bh Rp -
c. Pas. Kran Dinding bh Rp -
d. Pas. Instalasi Air Bersih ls Rp -
e. Pas. Instalasi Air Kotor ls Rp -
f. Pek. Septictank ls Rp -
I Gapura Rp -
1 Pekerjaan Tanah Rp -
a. Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 Rp -
b. Pekerjaan urugan kembali (backfill) m3 Rp -
c. Pekerjaan buangan sisa galian ke disposal m3 Rp -
2 Pekerjaan Pondasi Tapak Rp -
a. Lantai Kerja m3 Rp -
3 Pekerjaan Beton K-175 Rp -
a. Lantai Kerja m3 Rp -
4 Pekerjaan Beton Bertulang K-250 Insitu Rp -
4.1 Pondasi Rp -
a. Pekerjaan Beton K-250 m3 Rp -
b. Pekerjaan Pembesian kg Rp -
c. Pekerjaan Bekisting m2 Rp -
4.2 Sloof Rp -
a. Pekerjaan Beton K-250 m3 Rp -
b. Pekerjaan Pembesian kg Rp -
c. Pekerjaan Bekisting m2 Rp -
4.3 Kolom Rp -
a. Pekerjaan Beton K-250 m3 Rp -
b. Pekerjaan Pembesian kg Rp -
c. Pekerjaan Bekisting m2 Rp -
4.4 Balok Rp -
a. Pekerjaan Beton K-250 m3 Rp -
b. Pekerjaan Pembesian kg Rp -
c. Pekerjaan Bekisting m2 Rp -
4.4 Ring Balok Rp -
a. Pekerjaan Beton K-250 m3 Rp -
b. Pekerjaan Pembesian kg Rp -
c. Pekerjaan Bekisting m2 Rp -
4.5 Pelat Lantai Rp -
a. Pekerjaan Beton K-250 m3 Rp -
b. Pekerjaan Pembesian kg Rp -
c. Pekerjaan Bekisting m2 Rp -
4.6 Lisplank Rp -
a. Pekerjaan Beton K-250 m3 Rp -
b. Pekerjaan Pembesian kg Rp -
c. Pekerjaan Bekisting m2 Rp -
5 Pekerjaan Rangka Atap Baja Ringan Rp -
5.1 Pemasangan Rangka Baja ringan m2 Rp -
6 Pekerjaan Arsitektur Rp -
6.1 Pekerjaan Dinding Rp -
a. Pekerjaan Dinding 1/2 Bata m2 Rp -
b. Plesteran m2 Rp -
c. Acian m2 Rp -
6.2 Pekerjaan Lantai Rp -
a. Keramik 400x400mm m2 Rp -
6.3 Pekerjaan Plafon Rp -
a. Plafon Gypsum 9 mm m2 Rp -
6.4 Pekerjaan Pintu dan Jendela Rp -
a. Pintu P1 (2200x2980mm) Kayu Double Multi Lapis HPL + Kaca unit Rp -

b. unit Rp -
Pintu P2 (900x2250mm) Alumunium + Kayu Double Multi Lapis HPL
c. Pintu P3 (900x2250mm) Alumunium unit Rp -
d. PJ (2525x2200mm) Alumunium + Kayu Double + Kaca unit Rp -
e. Jendela J2 (1700x1600mm) Alumunium + Kaca unit Rp -
f. Jendela J3 (870x600mm) Alumunium +Kaca unit Rp -
g. Jendela JS1 (1000x3080mm) Alumunium + Kayu Double unit Rp -
h. Jendela JS2 (1660x4430mm) Alumunium + Kayu Double unit Rp -
6.5 Pekerjaan Finishing Rp -
a. Pengecatan Dinding Interior m2 Rp -
b. Pengecatan Dinding Exterior m2 Rp -
c. Pengecatan Plafond m2 Rp -
6.6 Pekerjaan Penutup Atap Rp -
a. Pemasangan Atap Metal Zincalumn m2 Rp -
b. Pemasangan Bubung Metal Zincalumn m' Rp -
7 Pekerjaan Listrik Rp -
a. Pas. Lampu Pijar +Fitting bh Rp -
b. Pas. Lampu Down light + Fitting bh Rp -
c. Pek. Pas. Stop Kontak (with child protection) setara Philips bh Rp -
d. Pek. Pas. Saklar Tunggal, setara Philips bh Rp -
e. Pek. Pas. Saklar Ganda, setara Philips bh Rp -
f. Pas. Instalasi Titik Api ttk Rp -
8 Pekerjaan Sanitasi dan Saniter Rp -
a. Pas. Closet Duduk + Accessories bh Rp -
b. Pas. Wastafel + Accessories bh Rp -
c. Pas. Kran Dinding bh Rp -
d. Pas. Instalasi Air Bersih ls Rp -
e. Pas. Instalasi Air Kotor ls Rp -
f. Pek. Septictank ls Rp -
J Tangki Air Rp -
1 Pekerjaan Tanah Rp -
a. Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 9.8832 Rp -
b. Pengurugan Tanah Kembali Untuk Konstruksi m3 6.274 Rp -
2 Pekerjaan Beton K-175 Rp -
a. Lantai Kerja m3 0.6572 Rp -
3 Pekerjaan Beton Bertulang K-250 Insitu Rp -
3.1 Pondasi Rp -
a. Pekerjaan Beton K-250 m3 2.952 Rp -
b. Pekerjaan Pembesian kg 342.636 Rp -
c. Pekerjaan Bekisting m2 10.560 Rp -
3.2 Sloof Rp -
a. Pekerjaan Beton K-250 m3 1.171 Rp -
b. Pekerjaan Pembesian kg 136.604 Rp -
c. Pekerjaan Bekisting m2 15.616 Rp -
4 Pekerjaan Baja Rp -
4.1 Pipa Besi Ø2 " kg 236.773 Rp -
4.2 Pipa Besi Ø1 " kg 60.264 Rp -
4.3 L.50.50.6 kg 1007.736 Rp -
4.4 2L.50.50.6 kg 31.453 Rp -
4.5 2L.90.90.7 kg 612.801 Rp -
4.6 L.40.40.4 kg 108.832 Rp -
4.7 Bracing L.40.40.4 kg 69.967 Rp -
4.8 Bracing L.65.65.6 kg 190.775 Rp -
4.9 Bracing L.50.50.6 kg 242.977 Rp -
4.1 Bracing 2L.50.50.6 kg 205.977 Rp -
4.11 Expended Mesh m2 13.148 Rp -

K Lapangan Penumpukan Semenisasi

L Lapangan Penumpukan Terbuka


M Lapangan Parkir
N Gangway dan Pagar BRC
O Lampu PJU dan Taman
P Lansekap
O Marka dan Kanstein
R Pekerjaan Signage
S PEKERJAAN LAIN LAIN
1 Pekerjaan Pembersihan ls 1.00 25,000,000.00 Rp 25,000,000.00
SUBTOTAL 20 Rp 25,000,000.00
BADAN PENGUSAHAAN KAWASAN
PERDAGANGAN BEBAS DAN PELABUHAN BEBAS BINTAN
WILAYAH KOTA TANJUNGPINANG

RENCANA ANGGARAN BIAYA ( R A B )


PENYUSUNAN DED SISI DARAT
PELABUHAN TANJUNG MOCO

VOLUME HARGA SATUAN JUMLAH HARGA


No. URAIAN PEKERJAAN SATUAN
Rp Rp
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi Peralatan Ls 1.00 1,387,686,149.00 Rp 1,387,686,149.00
2 Pemasangan Pagar Sementara dari Seng Gelombang t=2m Unit 660.00 469,000.00 Rp 309,540,000.00
3 Pengukuran dan Positioning Ls 1.00 51,480,000.00 Rp 51,480,000.00
4 Direksi Keet dan Gudang Ls 1.00 1,776,500.00 Rp 1,776,500.00
5 Keselamatan Kerja Ls 1.00 42,294,120.00 Rp 42,294,120.00
6 Pelaporan dan Dokumentasi Ls 1.00 190,978,857.00 Rp 190,978,857.00
SUBTOTAL Rp 1,983,755,626.00
II PEKERJAAN PEMATANGAN LAHAN
1 Pekerjaan Pematangan Lahan
Pembersihan Lahan (Grubbing & Clearing) m2 35000 35,893.00 Rp 1,256,255,000.00
Pembersihan Lahan (Stripping, t=0,2 m) m2 35000 62,533.00 Rp 2,188,655,000.00
SUBTOTAL Rp 3,444,910,000.00
III PERKERASAN JALAN
1 Pekerjaan Jalan m2 7056.000 2,160,401.00 Rp 15,243,789,456.00
SUBTOTAL Rp 15,243,789,456.00
VOLUME HARGA SATUAN JUMLAH HARGA
No. URAIAN PEKERJAAN SATUAN
Rp Rp
IV FASILITAS BANGUNAN DARAT
A KANTOR PELABUHAN + KANTIN
1 Pekerjaan Tanah
Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 33.75 88,000.00 Rp 2,970,000.00
Pekerjaan urugan kembali (backfill) m3 11.196 66,000.00 Rp 738,936.00
Pekerjaan buangan sisa galian ke disposal m3 22.554 38,500.00 Rp 868,329.00

2 Pekerjaan Pondasi Tapak


Lantai Kerja m3 2.304 1,116,118.00 Rp 2,571,535.87

3 Pekerjaan Beton K-100


Lantai Kerja m3 15.151 1,116,118.00 Rp 16,910,783.19

4 Pekerjaan Beton Bertulang


4.1 Pekerjaan Fundasi Telapak
a. Pekerjaan pembesian fundasi telapak kg 1140.000 33,293.00 Rp 37,954,020.00
b. Pekerjaan Bekisting Fundasi Telapak m2 63.700 174,460.00 Rp 11,113,102.00
c Pekerjaan Pengecoran Beton K-300 m3 20.250 1,436,315.00 Rp 29,085,378.75

4.2 Pekerjaan Tie Beam / sloof beton


a. Pekerjaan pembesian tie beam kg 1934.292 33,293.00 Rp 64,398,383.56
b. Pekerjaan Bekisting tie beam m2 101.400 174,460.00 Rp 17,690,244.00
c Pekerjaan Pengecoran Beton K-225 m3 7.020 1,374,635.00 Rp 9,649,937.70

4.3 Pekerjaan Kolom Beton


a. Pekerjaan pembesian kolom kg 749.820 33,293.00 Rp 24,963,757.26
b. Pekerjaan Bekisting kolom m2 78.000 174,460.00 Rp 13,607,880.00
c Pekerjaan Pengecoran Beton K-225 m3 3.600 1,374,635.00 Rp 4,948,686.00

4.4 Pekerjaan Balok Beton


a. Pekerjaan pembesian balok kg 1934.292 33,293.00 Rp 64,398,383.56
b. Pekerjaan Bekisting balok m2 101.400 174,460.00 Rp 17,690,244.00
c Pekerjaan Pengecoran Beton K-225 m3 7.020 1,374,635.00 Rp 9,649,937.70

4.5 Slab On Ground


a. Pekerjaan pembesian slab on ground kg 1292.41 33,293.00 Rp 43,028,152.86
b. Pekerjaan Bekisting slab on ground m2 11.70 174,460.00 Rp 2,041,182.00
c Pekerjaan Pengecoran Beton K-225 m3 36.00 1,374,635.00 Rp 49,486,860.00

5 Rangka Atap Baja / rafter + Baja gording canal C kg 3775.34 28,050.00 Rp 105,898,343.10

6 Pekerjaan Arsitektur
6.1 Pekerjaan Dinding
a. Pekerjaan Dinding 1/2 Bata m2 294.722 288,908.00 Rp 85,147,543.58
b. Plesteran m2 589.444 82,715.00 Rp 48,755,860.46
c Acian m2 589.444 38,720.00 Rp 22,823,271.68
d. Keramik Dinding Toilet 200x400mm m2 60.445 353,698.00 Rp 21,379,275.61

6.2 Pekerjaan Lantai


a. Keramik Glossy 500x500mm m2 188.795 279,000.00 Rp 52,673,805.00
b. Keramik non slip 400x400mm m2 11.205 221,000.00 Rp 2,476,305.00
c. Lantai Plesteran K-125 m2 103.84 1,232,520.00 Rp 127,984,876.80

6.3 Pekerjaan Plafon


a. Plafon Gypsum 9 mm m2 293.8795 74,833.00 Rp 21,991,884.62
b. Rangka Langit-Langit Besi Hollow 40.40mm m2 293.8795 255,640.00 Rp 75,127,355.38
c. List

6.4 Pekerjaan Pintu dan Jendela


a. Pintu P1 (1800x2600 mm) Alumunium + Kaca unit 1 4,503,063.00 Rp 4,503,063.00
b. Pintu P2 (2200x2600mm) Alumunium + Kaca unit 1 4,566,760.00 Rp 4,566,760.00
c. Pintu P3 (900x2600mm) Alumunium + Kaca unit 8 3,312,375.00 Rp 26,499,000.00
d. Pintu P4 (700x2200mm) Alumunium unit 4 2,426,600.00 Rp 9,706,400.00
e. Jendela J1 (4740x2502mm) Alumunium + Kaca unit 1 10,849,102.00 Rp 10,849,102.00
f. Jendela J2 (1700x1600mm) Alumunium + Kaca unit 5 3,547,495.00 Rp 17,737,475.00
g. Jendela J3 (1700x1600mm) Alumunium + Kaca unit 2 3,461,475.00 Rp 6,922,950.00
h. Jendela J4 (950x600mm) Alumunium + Kaca unit 6 1,141,668.00 Rp 6,850,008.00

6.5 Pekerjaan Finishing


a. Pengecatan Dinding Interior m2 510.623 56,478.00 Rp 28,838,965.79
b. Pengecatan Dinding Exterior m2 195.339 56,478.00 Rp 11,032,356.04
c. Pengecatan Plafond m2 293.8795 42,966.00 Rp 12,626,826.60

6.6 Pekerjaan Penutup Atap


a. Pemasangan Atap Genteng m2 418.07833 127,600.00 Rp 53,346,794.91
b. Pemasangan Bubung Metal Zincalumn m' 39.63 93,335.00 Rp 3,698,866.05
c. Lisplank m 74.75 201,135.00 Rp 15,034,841.25

7 Pekerjaan Listrik
a. Pas. Lampu LED T8 LED 16W bh 30 153,000.00 Rp 4,590,000.00
b. Pas. Lampu Down light + Fitting bh 9 141,000.00 Rp 1,269,000.00
VOLUME HARGA SATUAN JUMLAH HARGA
No. URAIAN PEKERJAAN SATUAN
Rp Rp
c. Pek. Pas. Stop Kontak bh 11 90,990.00 Rp 1,000,890.00
d. Pek. Pas. Saklar Tunggal, setara Philips bh 5 48,995.00 Rp 244,975.00
e. Pek. Pas. Saklar Ganda, setara Philips bh 4 67,659.00 Rp 270,636.00
f. Pas. Lampu Dinding Spotlight Outdoor bh 9 147,000.00 Rp 1,323,000.00

8 Pekerjaan Sanitasi dan Saniter


a. Pas. Closet Duduk + Accessories bh 4 2,781,306.00 Rp 11,125,224.00
b. Pas. Wastafel + Accessories bh 3 965,448.00 Rp 2,896,344.00
c. Sink bh 1 1,421,288.00 Rp 1,421,288.00
d. Jetwasher bh 4 491,488.00 Rp 1,965,952.00
e. Floordrain bh 6 381,480.00 Rp 2,288,880.00
f. Cermin 800 x 1800 m2 1.44 294,910.00 Rp 424,670.40
SUBTOTAL Rp 1,229,058,522.72
B KANTOR KSOP
1 Pekerjaan Tanah
Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 105 88,000.00 Rp 9,240,000.00
Pekerjaan urugan kembali (backfill) m3 15.776 66,000.00 Rp 1,041,216.00
Pekerjaan buangan sisa galian ke disposal m3 89.224 38,500.00 Rp 3,435,124.00

2 Pekerjaan Pondasi Tapak


Lantai Kerja m3 6.529 1,116,118.00 Rp 7,287,134.42

3 Pekerjaan Beton K-100


Lantai Kerja m3 47.38125 1,116,118.00 Rp 52,883,065.99

4 Pekerjaan Beton Bertulang


4.1 Pekerjaan Fundasi Telapak 1
a. Pekerjaan pembesian fundasi telapak kg 1519.920 33,293.00 Rp 50,602,696.56
b. Pekerjaan Bekisting Fundasi Telapak m2 78.000 174,460.00 Rp 13,607,880.00
c Pekerjaan Pengecoran Beton K-300 m3 27.000 1,436,315.00 Rp 38,780,505.00

4.2 Pekerjaan Fundasi Telapak 2


a. Pekerjaan pembesian fundasi telapak kg 1980.000 33,293.00 Rp 65,920,140.00
b. Pekerjaan Bekisting Fundasi Telapak m2 78.000 174,460.00 Rp 13,607,880.00
c Pekerjaan Pengecoran Beton K-300 m3 36.000 1,436,315.00 Rp 51,707,340.00

4.3 Pekerjaan Tie Beam 1


a. Pekerjaan pembesian tie beam kg 1598.400 33,293.00 Rp 53,215,531.20
b. Pekerjaan Bekisting tie beam m2 57.720 174,460.00 Rp 10,069,831.20
c Pekerjaan Pengecoran Beton K-225 m3 5.328 1,374,635.00 Rp 7,324,055.28

4.4 Pekerjaan Tie Beam 2


a. Pekerjaan pembesian tie beam kg 3183.792 33,293.00 Rp 105,997,987.06
b. Pekerjaan Bekisting tie beam m2 146.640 174,460.00 Rp 25,582,814.40
c Pekerjaan Pengecoran Beton K-225 m3 10.152 1,374,635.00 Rp 13,955,294.52

4.5 Pekerjaan Tie Beam TB1A


a. Pekerjaan pembesian tie beam kg 947.412 33,293.00 Rp 31,542,187.72
b. Pekerjaan Bekisting tie beam m2 31.850 174,460.00 Rp 5,556,551.00
c Pekerjaan Pengecoran Beton K-225 m3 3.675 1,374,635.00 Rp 5,051,783.63

4.6 Pekerjaan Tie Beam TBA


a. Pekerjaan pembesian tie beam kg 132.390 33,293.00 Rp 4,407,660.27
b. Pekerjaan Bekisting tie beam m2 7.800 174,460.00 Rp 1,360,788.00
c Pekerjaan Pengecoran Beton K-225 m3 0.540 1,374,635.00 Rp 742,302.90

4.7 Slab On Ground


a. Pekerjaan pembesian slab on ground kg 3839.35 33,293.00 Rp 127,823,566.11
b. Pekerjaan Bekisting slab on ground m2 19.50 174,460.00 Rp 3,401,970.00
c Pekerjaan Pengecoran Beton K-225 m3 108.00 1,374,635.00 Rp 148,460,580.00

4.8 Pekerjaan Kolom Beton


a. Pekerjaan pembesian kolom kg 4724.370 33,293.00 Rp 157,288,450.41
b. Pekerjaan Bekisting kolom m2 227.500 174,460.00 Rp 39,689,650.00
c Pekerjaan Pengecoran Beton K-300 m3 11.813 1,436,315.00 Rp 16,966,557.12

4.9 Pekerjaan Balok Beton B1


a. Pekerjaan pembesian balok kg 1604.316 33,293.00 Rp 53,412,492.59
b. Pekerjaan Bekisting balok m2 76.960 174,460.00 Rp 13,426,441.60
c Pekerjaan Pengecoran Beton K-300 m3 5.328 1,436,315.00 Rp 7,652,686.32

4.10 Pekerjaan Balok Beton B2


a. Pekerjaan pembesian balok kg 3312.312 33,293.00 Rp 110,276,803.42
b. Pekerjaan Bekisting balok m2 190.125 174,460.00 Rp 33,169,207.50
c Pekerjaan Pengecoran Beton K-300 m3 10.530 1,436,315.00 Rp 15,124,396.95

4.11 Pekerjaan Balok Beton B1A


a. Pekerjaan pembesian balok kg 950.376 33,293.00 Rp 31,640,868.17
b. Pekerjaan Bekisting balok m2 43.225 174,460.00 Rp 7,541,033.50
c Pekerjaan Pengecoran Beton K-300 m3 3.675 1,436,315.00 Rp 5,278,457.63
VOLUME HARGA SATUAN JUMLAH HARGA
No. URAIAN PEKERJAAN SATUAN
Rp Rp
4.12 Pekerjaan Balok Beton BA
a. Pekerjaan pembesian balok kg 363.499 33,293.00 Rp 12,101,978.87
b. Pekerjaan Bekisting balok m2 23.400 174,460.00 Rp 4,082,364.00
c Pekerjaan Pengecoran Beton K-300 m3 2.160 1,436,315.00 Rp 3,102,440.40

4.13 Pekerjaan Slab / Plat Lantai


a. Pekerjaan pembesian plat lantai kg 6008.796 33,293.00 Rp 200,050,845.23
b. Pekerjaan Bekisting kolom m2 780.000 174,460.00 Rp 136,078,800.00
c Pekerjaan Pengecoran Beton K-300 m3 90.480 1,436,315.00 Rp 129,957,781.20

4.14 Pekerjaan Kolom Beton Lantai 2 (K2)


a. Pekerjaan pembesian kolom kg 4724.370 33,293.00 Rp 157,288,450.41
b. Pekerjaan Bekisting kolom m2 227.500 174,460.00 Rp 39,689,650.00
c Pekerjaan Pengecoran Beton K-225 m3 11.813 1,374,635.00 Rp 16,237,958.42

4.15 Pekerjaan Balok Beton Lantai 2 B2


a. Pekerjaan pembesian balok kg 4629.516 33,293.00 Rp 154,130,476.19
b. Pekerjaan Bekisting balok m2 260.260 174,460.00 Rp 45,404,959.60
c Pekerjaan Pengecoran Beton K-225 m3 16.632 1,374,635.00 Rp 22,862,929.32

4.16 Pekerjaan Dua Unit Struktur Tangga


a. Pekerjaan pembesian tangga kg 907.47 33,293.00 Rp 30,212,518.56
b. Pekerjaan Bekisting tangga m2 60.79 174,460.00 Rp 10,606,051.46
c Pekerjaan Pengecoran Beton K-300 m3 5.94 1,436,315.00 Rp 8,531,711.10

5 Pekerjaan Rangka Atap Baja Ringan


Pemasangan Rangka Baja ringan m2 931.51846 258,500.00 Rp 240,797,521.91

6 Pekerjaan Arsitektur
6.1 Pekerjaan Dinding
a. Pekerjaan Dinding 1/2 Bata m2 1701.8 288,908.00 Rp 491,663,634.40
b. Plesteran m2 3403.6 82,715.00 Rp 281,528,774.00
c. Acian m2 3403.6 38,720.00 Rp 131,787,392.00
d. Keramik Dinding 200x400mm m2 61.515 353,698.00 Rp 21,757,732.47

6.2 Pekerjaan Lantai Rp -


a. Keramik Glossy 600x600 mm m2 1150.3 279,000.00 Rp 320,933,700.00
b. Keramik non slip 400x400mm m2 49.7 221,000.00 Rp 10,983,700.00

6.3 Pekerjaan Plafon


a. Plafon Gypsum 9 mm m2 1359 74,833.00 Rp 101,698,047.00
b. Rangka Langit-Langit Besi Hollow 40.40mm m2 1359 73,315.00 Rp 99,635,085.00

6.4 Pekerjaan Pintu dan Jendela Rp -


a. Pintu P1 (2200x2980mm) Kayu Double Multi Lapis HPL + Kaca unit 8 4,994,564.00 Rp 39,956,512.00

unit 3,312,375.00 Rp 33,123,750.00


b. Pintu P2 (900x2600mm) Alumunium + Kayu Double Multi Lapis HPL 10
c. Pintu P3 (700x2200mm) Alumunium unit 12 2,426,600.00 Rp 29,119,200.00
d. PJ (2525x2200mm) Alumunium + Kayu Double + Kaca unit 6 5,932,290.00 Rp 35,593,740.00
e. Jendela J2 (1700x1600mm) Alumunium + Kaca unit 47 3,547,495.00 Rp 166,732,265.00
f. Jendela J3 (870x600mm) Alumunium +Kaca unit 6 1,102,068.00 Rp 6,612,408.00
g. Jendela JS1 (1000x3000mm) Alumunium + Kayu Double unit 6 3,773,302.00 Rp 22,639,812.00
h. Jendela JS2 (1660x4430mm) Alumunium + Kayu Double unit 2 6,469,697.00 Rp 12,939,394.00

6.5 Pekerjaan Finishing


a. Pengecatan Dinding Interior m2 2733.6 56,478.00 Rp 154,388,260.80
b. Pengecatan Dinding Exterior m2 670 56,478.00 Rp 37,840,260.00
c. Pengecatan Plafond m2 1359 42,966.00 Rp 58,390,794.00

6.5 Pekerjaan Penutup Atap


a. Pemasangan Atap Genteng m2 931.51846 127,600.00 Rp 118,861,755.50
b. Pemasangan Bubung m' 54.92 93,335.00 Rp 5,125,958.20
c. Lisplank m' 126.75 201,135.00 Rp 25,493,861.25

7 Pekerjaan Listrik
a. Pas. Lampu LED T8 LED 16W bh 92 153,000.00 Rp 14,076,000.00
b. Pas. Lampu Down light + Fitting bh 36 141,000.00 Rp 5,076,000.00
c. Pek. Pas. Stop Kontak bh 50 90,990.00 Rp 4,549,500.00
d. Pek. Pas. Saklar Tunggal, setara Philips bh 14 48,995.00 Rp 685,930.00
e. Pek. Pas. Saklar Ganda, setara Philips bh 15 67,659.00 Rp 1,014,885.00
f. Pas. Lampu Dinding Spotlight Outdoor ttk 28 147,000.00 Rp 4,116,000.00

8 Pekerjaan Sanitasi dan Saniter


a. Pas. Closet Duduk + Accessories bh 10 2,781,306.00 Rp 27,813,060.00
b. Pas. Wastafel + Accessories bh 8 965,448.00 Rp 7,723,584.00
c. Urinor bh 6 3,005,288.00 Rp 18,031,728.00
e. Kaca 900 x 1850 mm m2 3.33 294,910.00
d. Floordrain stainless bh 8 381,480.00 Rp 3,051,840.00
e. Jetshower bh 10 491,488.00 Rp 4,914,880.00
SUBTOTAL Rp 4,853,068,809.72
C. Gudang Pelabuhan
VOLUME HARGA SATUAN JUMLAH HARGA
No. URAIAN PEKERJAAN SATUAN
Rp Rp
1 Pekerjaan Tanah
Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 30.6875 88,000.00 Rp 2,700,500.00
Pekerjaan urugan kembali (backfill) m3 17.286 66,000.00 Rp 1,140,843.00
Pekerjaan buangan sisa galian ke disposal m3 13.402 38,500.00 Rp 515,977.00

2 Pekerjaan Pondasi Tapak


Lantai Kerja m3 1.210 1,116,118.00 Rp 1,350,502.78

3 Pekerjaan Beton K-100


Lantai Kerja m3 37.4525 1,116,118.00 Rp 41,801,409.40

4 Pekerjaan Beton Bertulang


4.1 Pekerjaan Fundasi Telapak + Kolom Pedestal
a. Pekerjaan pembesian fundasi telapak + kolom pedestal kg 1127.520 33,293.00 Rp 37,538,523.36
b. Pekerjaan Bekisting Fundasi Telapak + kolom pedestal m2 79.040 174,460.00 Rp 13,789,318.40
c. Pekerjaan Pengecoran Beton K-300 m3 12.192 1,436,315.00 Rp 17,511,552.48
d. Angkur D20 bh 100.000 45,000.00 Rp 4,500,000.00

4.2 Pekerjaan Tie Beam / sloof


a. Pekerjaan pembesian tie beam kg 2466.358 33,293.00 Rp 82,112,443.58
b. Pekerjaan Bekisting tie beam m2 180.180 174,460.00 Rp 31,434,202.80
c. Pekerjaan Pengecoran Beton K-300 m3 20.790 1,436,315.00 Rp 29,860,988.85

4.3 Pekerjaan Kolom Baja WF kg 5725.200 28,050.00 Rp 160,591,860.00

4.4 Pekerjaan Balok Baja WF kg 2815.920 28,050.00 Rp 78,986,556.00

4.5 Slab On Ground


a. Pekerjaan Pembesian Pelat Lantai kg 5083.176 33,293.00 Rp 169,234,178.57
b. Pekerjaan Bekisting m2 23.400 174,460.00 Rp 4,082,364.00
c. Pekerjaan Pengecoran K-300 m3 144.000 1,436,315.00 Rp 206,829,360.00

5 Pekerjaan Rangka Atap kg 9988.24 28,050.00 Rp 280,170,132.00

6 Pekerjaan Arsitektur
6.1 Pekerjaan Dinding
a. Pekerjaan Dinding 1/2 Bata m2 660 288,908.00 Rp 190,679,280.00
b. Plesteran m2 1320 82,715.00 Rp 109,183,800.00
c. Acian m2 1320 38,720.00 Rp 51,110,400.00

6.2 Pekerjaan Lantai


a. Plesteran K-125 m2 749.05 1,232,520.00 Rp 923,219,106.00

6.3 Pekerjaan Plafon


a. Plafon Gypsum 9 mm m2 749.05 74,833.00 Rp 56,053,658.65
b. Rangka Langit-Langit Besi Hollow 40.40mm m2 749.05 73,315.00

6.4 Pekerjaan Pintu dan Jendela


a. Pintu P1 (4000x4000) Plat Besi unit 2 32,703,121.00 Rp 65,406,242.00
b. Jendela J1 (820 x 2200mm) unit 12 2,609,499.00 Rp 31,313,988.00
c. Jendela J2 (745x2000mm) Alumunium unit 4 2,700,225.00 Rp 10,800,900.00

6.5 Pekerjaan Finishing


a. Pengecatan Dinding Interior m2 660 56,478.00 Rp 37,275,480.00
b. Pengecatan Dinding Exterior m2 660 56,478.00 Rp 37,275,480.00
c. Pengecatan Plafond m2 749.05 42,966.00 Rp 32,183,682.30

6.6 Pekerjaan Penutup Atap


a. Pemasangan Atap m2 446.6209 127,600.00 Rp 56,988,826.84
b. Pemasangan Bubung m' 42.65 93,335.00 Rp 3,980,737.75

7 Pekerjaan Listrik
a. Pas. Lampu LED T8 LED 16W bh 24 153,000.00 Rp 3,672,000.00
b. Pek. Pas. Stop Kontak bh 6 90,990.00 Rp 545,940.00
c. Pek. Pas. Saklar Tunggal bh 3 48,995.00 Rp 146,985.00
d. Pas. Lampu Spotlight ttk 6 147,000.00 Rp 882,000.00
SUBTOTAL Rp 2,774,869,218.75
D Kantor Imigrasi, Karantina, K3, Bea Cukai
1 Pekerjaan Tanah
Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 30.72 88,000.00 Rp 2,703,360.00
Pekerjaan urugan kembali (backfill) m3 9.582 66,000.00 Rp 632,412.00
Pekerjaan buangan sisa galian ke disposal m3 21.138 38,500.00 Rp 813,813.00

2 Pekerjaan Pondasi Tapak


Lantai Kerja m3 1.536 1,116,118.00 Rp 1,714,357.25

3 Pekerjaan Beton K-100


Lantai Kerja m3 5.34375 1,116,118.00 Rp 5,964,255.56

4 Pekerjaan Beton Bertulang


4.1 Pekerjaan Fundasi Telapak
VOLUME HARGA SATUAN JUMLAH HARGA
No. URAIAN PEKERJAAN SATUAN
Rp Rp
a. Pekerjaan pembesian fundasi telapak kg 912.000 33,293.00 Rp 30,363,216.00
b. Pekerjaan Bekisting Fundasi Telapak m2 46.800 174,460.00 Rp 8,164,728.00
c. Pekerjaan Pengecoran Beton K-300 m3 16.200 1,436,315.00 Rp 23,268,303.00

4.2 Pekerjaan Tie Beam / sloof beton


a. Pekerjaan pembesian tie beam kg 930.012 33,293.00 Rp 30,962,889.52
b. Pekerjaan Bekisting tie beam m2 49.140 174,460.00 Rp 8,572,964.40
c. Pekerjaan Pengecoran Beton K-225 m3 3.402 1,374,635.00 Rp 4,676,508.27

4.3 Pekerjaan Kolom Beton


a. Pekerjaan pembesian kolom kg 545.080 33,293.00 Rp 18,147,335.12
b. Pekerjaan Bekisting kolom m2 56.160 174,460.00 Rp 9,797,673.60
c. Pekerjaan Pengecoran Beton K-225 m3 2.592 1,374,635.00 Rp 3,563,053.92

4.3 Pekerjaan Balok Beton


a. Pekerjaan pembesian balok kg 930.012 33,293.00 Rp 30,962,889.52
b. Pekerjaan Bekisting balok m2 49.140 174,460.00 Rp 8,572,964.40
c. Pekerjaan Pengecoran Beton K-225 m3 3.402 1,374,635.00 Rp 4,676,508.27

4.4 Pelat Lantai


a. Pekerjaan pembesian pelat lantai kg 490.590 33,293.00 Rp 16,333,212.87
b. Pekerjaan Bekisting pelat lantai m2 8.400 174,460.00 Rp 1,465,464.00
c. Pekerjaan Pengecoran Beton K-225 m3 13.500 1,374,635.00 Rp 18,557,572.50

5 Pekerjaan Rangka Atap


Pemasangan Rangka Baja ringan IWF 150x75x5x7 m2 160.85093 258,500.00 Rp 41,579,965.41

6 Pekerjaan Arsitektur
6.1 Pekerjaan Dinding
a. Pekerjaan Dinding 1/2 Bata m2 159 288,908.00 Rp 45,936,372.00
b. Plesteran m2 318 82,715.00 Rp 26,303,370.00
c. Acian m2 318 38,720.00 Rp 12,312,960.00
d. Keramik Dinding m2 42.39 353,698.00 Rp 14,993,258.22

6.2 Pekerjaan Lantai


a. Keramik Glossy 600x600mm m2 60 279,000.00 Rp 16,740,000.00
b. Keramik non slip 400x400mm m2 15 221,000.00 Rp 3,315,000.00

6.3 Pekerjaan Plafon


a. Plafon Gypsum 9 mm m2 14.75322 74,833.00 Rp 1,104,027.71
b. Rangka Langit-Langit Besi Hollow 40.40mm m2 14.75322 73,315.00 Rp 1,081,632.32

6.4 Pekerjaan Pintu dan Jendela


a. Pintu P1 (900x2600mm) Alumunium + Kaca unit 5 3,312,375.00 Rp 16,561,875.00
b. Pintu P2 (700x2200mm) Alumunium unit 2 2,426,600.00 Rp 4,853,200.00
c. Jendela J1 (1700x1600mm) Alumunium + Kaca unit 4 3,547,495.00 Rp 14,189,980.00
d. Jendela J2 (870x600mm) Alumunium +Kaca unit 6 1,102,068.00 Rp 6,612,408.00

6.5 Pekerjaan Finishing


a. Pengecatan Dinding Interior m2 228 56,478.00 Rp 12,876,984.00
b. Pengecatan Dinding Exterior m2 120 56,478.00 Rp 6,777,360.00
c. Pengecatan Plafond m2 14.75322 42,966.00 Rp 633,886.85

6.6 Pekerjaan Penutup Atap


a. Pemasangan Atap Genteng m2 160.85093 127,600.00 Rp 20,524,578.67
b. Pemasangan Bubung Metal Zincalumn m' 32.981 93,335.00 Rp 3,078,281.64

7 Pekerjaan Listrik
a. Pas. Lampu LED T8 LED 16W bh 12 153,000.00 Rp 1,836,000.00
b. Pas. Lampu Down light + Fitting bh 6 141,000.00 Rp 846,000.00
c. Pek. Pas. Stop Kontak bh 8 90,990.00 Rp 727,920.00
d. Pek. Pas. Saklar Tunggal bh 5 48,995.00 Rp 244,975.00
e. Pek. Pas. Saklar Ganda, setara Philips bh 1 67,659.00 Rp 67,659.00
f. Pas. Lampu Spotlight ttk 5 147,000.00 Rp 735,000.00

8 Pekerjaan Sanitasi dan Saniter


a. Pas. Closet Duduk + Accessories bh 2 2,781,306.00 Rp 5,562,612.00
b. Pas. Wastafel + Accessories bh 1 965,448.00 Rp 965,448.00
c. Urinoir bh 3 3,005,288.00 Rp 9,015,864.00
e. Kaca 560 x 840 m2 4.704 294,910.00 Rp 1,387,256.64
d. Jet washer bh 2 491,488.00 Rp 982,976.00
e. Floor drain stainless bh 3 381,480.00 Rp 1,144,440.00
SUBTOTAL Rp 502,904,771.65
E Pos Jaga
1 Pekerjaan Tanah
Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 11.2 88,000.00 Rp 985,600.00
Pekerjaan urugan kembali (backfill) m3 5.040 66,000.00 Rp 332,640.00
Pekerjaan buangan sisa galian ke disposal m3 6.160 38,500.00 Rp 237,160.00

2 Pekerjaan Pondasi Batu Kali


Pondasi Batu Kali m3 4.2 1,075,184.00 Rp 4,515,772.80
VOLUME HARGA SATUAN JUMLAH HARGA
No. URAIAN PEKERJAAN SATUAN
Rp Rp
Pasir Urug m3 0.700 259,600.00 Rp 181,720.00

3 Pekerjaan Beton K-100


Lantai Kerja m3 1.25 1,116,118.00 Rp 1,395,147.50

4 Pekerjaan Beton Bertulang


4.1 Pekerjaan Tie Beam / sloof beton
a. Pekerjaan pembesian tie beam kg 417.247 33,293.00 Rp 13,891,411.03
b. Pekerjaan Bekisting tie beam m2 21.840 174,460.00 Rp 3,810,206.40
c. Pekerjaan Pengecoran Beton K-225 m3 1.260 1,374,635.00 Rp 1,732,040.10

4.2 Pekerjaan Kolom Beton


a. Pekerjaan pembesian kolom kg 269.136 33,293.00 Rp 8,960,344.85
b. Pekerjaan Bekisting kolom m2 28.080 174,460.00 Rp 4,898,836.80
c. Pekerjaan Pengecoran Beton K-225 m3 1.296 1,374,635.00 Rp 1,781,526.96

4.3 Pekerjaan Balok Beton


a. Pekerjaan pembesian balok kg 326.251 33,293.00 Rp 10,861,881.20
b. Pekerjaan Bekisting balok m2 21.840 174,460.00 Rp 3,810,206.40
c. Pekerjaan Pengecoran Beton K-225 m3 1.512 1,374,635.00 Rp 2,078,448.12

4.4 Pelat Lantai


a. Pekerjaan pembesian pelat kg 341.280 33,293.00 Rp 11,362,235.04
b. Pekerjaan Bekisting pelat m2 4.300 174,460.00 Rp 750,178.00
c. Pekerjaan Pengecoran Pelat K-225 m3 4.500 1,374,635.00 Rp 6,185,857.50

5 Pekerjaan Rangka Atap


Pemasangan Rangka Baja ringan m2 66.45164 258,500.00 Rp 17,177,748.94

6 Pekerjaan Arsitektur
6.1 Pekerjaan Dinding
a. Pekerjaan Dinding 1/2 Bata m2 84 288,908.00 Rp 24,268,272.00
b. Plesteran m2 168 82,715.00 Rp 13,896,120.00
c. Acian m2 168 38,720.00 Rp 6,504,960.00
d. Dinding Keramik 200x400mm m2 7.56 353,698.00 Rp 2,673,956.88

6.2 Pekerjaan Lantai


a. Keramik Non Glossy 600x600mm m2 21.4 279,000.00 Rp 5,970,600.00
b. Keramik non slip 400x400mm m2 3.6 221,000.00 Rp 795,600.00

6.3 Pekerjaan Plafon


a. Plafon Gypsum 9 mm m2 65.61 74,833.00 Rp 4,909,793.13
b. Rangka Langit-Langit Besi Hollow 40.40mm m2 65.61 73,315.00 Rp 4,810,197.15

6.4 Pekerjaan Pintu dan Jendela


a. Pintu P1 (900x2600mm) Alumunium + Kaca unit 2 3,312,375.00 Rp 6,624,750.00
b. Jendela J1 (1700x1600mm) Alumunium + Kaca unit 1 3,547,495.00 Rp 3,547,495.00
c. Jendela J2 (870x600mm) Alumunium +Kaca unit 1 1,102,068.00 Rp 1,102,068.00

6.5 Pekerjaan Finishing m2


a. Pengecatan Dinding Interior m2 108 56,478.00 Rp 6,099,624.00
b. Pengecatan Dinding Exterior m2 60 56,478.00 Rp 3,388,680.00
c. Pengecatan Plafond m2 65.61 42,966.00 Rp 2,818,999.26
d. Ukiran Kayu m2 1.92 187,500.00 Rp 360,000.00

6.6 Pekerjaan Penutup Atap


a. Pemasangan Atap Genteng m2 66.45164 127,600.00 Rp 8,479,229.26
b. Pemasangan Bubung Metal Zincalumn m' 23.2 93,335.00 Rp 2,165,372.00

7 Pekerjaan Listrik
a. Pas. Lampu LED T8 LED 16W bh 2 153,000.00 Rp 306,000.00
b. Pas. Lampu Down light + Fitting bh 5 141,000.00 Rp 705,000.00
c. Pek. Pas. Stop Kontak bh 2 90,990.00 Rp 181,980.00
d. Pek. Pas. Saklar Tunggal bh 1 48,995.00 Rp 48,995.00
e. Pek. Pas. Saklar Ganda, setara Philips bh 2 67,659.00 Rp 135,318.00
f. Pas. Lampu Spotlight ttk 4 147,000.00 Rp 588,000.00
-
8 Pekerjaan Sanitasi dan Saniter -
a. Pas. Closet Duduk + Accessories bh 1 2,781,306.00 Rp 2,781,306.00
b. Pas. Kran Dinding bh 1 134,805.00 Rp 134,805.00
c. Jet Washet bh 1 491,488.00 Rp 491,488.00
d. Floor Drain Stainless bh 1 381,480.00 Rp 381,480.00
e. Talang Air m' 32.4 22,000.00 Rp 712,800.00
SUBTOTAL Rp 199,831,850.32
F Mushola
1 Pekerjaan Tanah
Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 8 88,000.00 Rp 704,000.00
Pekerjaan urugan kembali (backfill) m3 3.420 66,000.00 Rp 225,720.00
Pekerjaan buangan sisa galian ke disposal m3 4.580 38,500.00 Rp 176,330.00

2 Pekerjaan Pondasi Batu Kali


Pondasi Batu kali m3 3 1,075,184.00 Rp 3,225,552.00
VOLUME HARGA SATUAN JUMLAH HARGA
No. URAIAN PEKERJAAN SATUAN
Rp Rp
Pasir Urug m3 0.500 259,600.00 Rp 129,800.00

3 Pekerjaan Beton K-100


Lantai Kerja m3 1.25 1,116,118.00 Rp 1,395,147.50

4 Pekerjaan Beton Bertulang


4.1 Pekerjaan Tie Beam / sloof beton
a. Pekerjaan pembesian tie beam kg 297.739 33,293.00 Rp 9,912,631.19
b. Pekerjaan Bekisting tie beam m2 15.600 174,460.00 Rp 2,721,576.00
c. Pekerjaan Pengecoran Beton K-225 m3 1.080 1,374,635.00 Rp 1,484,605.80

4.2 Pekerjaan Kolom Beton


a. Pekerjaan pembesian kolom kg 177.648 33,293.00 Rp 5,914,434.86
b. Pekerjaan Bekisting kolom m2 18.720 174,460.00 Rp 3,265,891.20
c. Pekerjaan Pengecoran Beton K-225 m3 0.864 1,374,635.00 Rp 1,187,684.64

4.3 Pekerjaan Balok Beton


a. Pekerjaan pembesian balok kg 232.735 33,293.00 Rp 7,748,453.01
b. Pekerjaan Bekisting balok m2 15.600 174,460.00 Rp 2,721,576.00
c. Pekerjaan Pengecoran Beton K-225 m3 1.080 1,374,635.00 Rp 1,484,605.80

4.4 Pelat Lantai


a. Pekerjaan pembesian lantai kg 341.280 33,293.00 Rp 11,362,235.04
b. Pekerjaan Bekisting lantai m2 4.300 174,460.00 Rp 750,178.00
c. Pekerjaan Pengecoran Beton K-225 m3 4.500 1,374,635.00 Rp 6,185,857.50

5 Pekerjaan Rangka Atap


a. Pemasangan Rangka Baja ringan IWF 150x75x5x7 m2 66.45164 258,500.00 Rp 17,177,748.94

6 Pekerjaan Arsitektur
6.1 Pekerjaan Dinding
a. Pekerjaan Dinding 1/2 Bata m2 62.575 288,908.00 Rp 18,078,418.10
b. Plesteran m2 125.15 82,715.00 Rp 10,351,782.25
c. Acian m2 125.15 38,720.00 Rp 4,845,808.00
d. Keramik Dinding 200x400 mm m2 5.15 353,698.00 Rp 1,821,544.70

6.2 Pekerjaan Lantai


a. Keramik Glossy 600x600mm m2 26.58625 279,000.00 Rp 7,417,563.75
b. Keramik Non Slip 400x400mm m2 1.789 221,000.00 Rp 395,313.75

6.3 Pekerjaan Plafon


a. Plafon Gypsum 9 mm m2 65.61 74,833.00 Rp 4,909,793.13
b. Rangka Langit-Langit Besi Hollow 40.40mm m2 65.61 73,315.00 Rp 4,810,197.15

6.4 Pekerjaan Pintu dan Jendela


a. Jendela J7 (1438X1819mm) Alumunium + Kaca unit 4 3,035,040.00 Rp 12,140,160.00
b. Pintu (2763x1325)mm unit 1 3,152,288.00 Rp 3,152,288.00

6.5 Pekerjaan Finishing


a. Pengecatan Dinding Interior m2 60 56,478.00 Rp 3,388,680.00
b. Pengecatan Dinding Exterior m2 60 56,478.00 Rp 3,388,680.00
c. Pengecatan Plafond m2 65.61 42,966.00 Rp 2,818,999.26

6.6 Pekerjaan Penutup Atap


a. Pemasangan Atap Genteng m2 66.45164 127,600.00 Rp 8,479,229.26
b. Mahkota Plat Steel 3mm bh 1 750,000.00 Rp 750,000.00
c. Pemasangan Bubung Metal Zincalumn m' 23.2 93,335.00 Rp 2,165,372.00
d. Lisplank m 31.56 201,135.00 Rp 6,347,820.60

7 Pekerjaan Listrik
a. Pas. Lampu LED T8 LED 16W bh 3 153,000.00 Rp 459,000.00
b. Pas. Lampu Down light + Fitting bh 12 141,000.00 Rp 1,692,000.00
c. Pek. Pas. Stop Kontak bh 2 90,990.00 Rp 181,980.00
d. Pek. Pas. Saklar Ganda, setara Philips bh 2 67,659.00 Rp 135,318.00

8 Pekerjaan Sanitasi dan Saniter


a. Talang Air m 32.4 22,000.00 Rp 712,800.00
b. Pas. Kran Dinding bh 3 134,805.00 Rp 404,415.00
SUBTOTAL Rp 176,621,190.44
G Gapura
1 Pekejaan Tanah
Penggalian Tanah untuk Konstruksi m3 1.7825496 88,000 Rp 156,864.36
Pengurugan Tanah Kembali untuk Konstruksi m3 0.55728672 66,000 Rp 36,780.92
Pekerjaan buangan sisa galian ke disposal m3 1.22526288 38,500 Rp 47,172.62

2 Pekerjaan Beton Bertulang K-250 Insitu


Pondasi
Pondasi Batu Kali m3 1.63566288 1,075,184 Rp 1,758,638.56

Pekerjaan Tie Beam / sloof beton


Pekerjaan pembesian tie beam kg 57.456 33,293 Rp 1,912,882.61
Pekerjaan Bekisting tie beam m2 4.18 174,460 Rp 729,242.80
VOLUME HARGA SATUAN JUMLAH HARGA
No. URAIAN PEKERJAAN SATUAN
Rp Rp
Pekerjaan Pengecoran Beton K-225 m3 0.4104 1,374,635 Rp 564,150.20

Pekerjaan Kolom Beton


Pekerjaan pembesian kolom kg 1471.42944 33,293 Rp 48,988,300.35
Pekerjaan Bekisting kolom m2 75.3372 174,460 Rp 13,143,327.91
Pekerjaan Pengecoran Beton K-225 m3 11.318688 1,374,635 Rp 15,559,064.68

Pekerjaan Ring Balok


Pekerjaan pembesian kolom kg 38.88 33,293 Rp 1,294,431.84
Pekerjaan Bekisting kolom m2 4.95 174,460 Rp 863,577.00
Pekerjaan Pengecoran Beton K-225 m3 0.324 1,374,635 Rp 445,381.74

Pekerjaan Dak Beton


Pekerjaan pembesian Dak kg 100.188 33,293 Rp 3,335,559.08
Pekerjaan Bekisting Dak m2 5.06 174,460 Rp 882,767.60
Pekerjaan Pengecoran Beton K-225 m3 0.9108 1,374,635 Rp 1,252,017.56

4 Pekerjaan Dinding
a. Pekerjaan Dinding 1/2 Bata m2 19.38 288,908.00 Rp 5,599,037.04
b. Plesteran m2 38.76 82,715.00 Rp 3,206,033.40
c. Acian m2 38.76 38,720.00 Rp 1,500,787.20

3 Pekerjaan Pengecatan
Pek. Cat Beton m2 114.0972 56,478 Rp 6,443,981.66

4 Pekerjaan Atap & Aksesoris


Besi Hollow Diameter 4", Baseplate 5mm, Angkur Mur Baut 1" kg 223.45396752 28,050 Rp 6,267,883.79
Rangka Atap m2 63.9431 258,500 Rp 16,529,291.35
Atap Asbes m2 63.9431 64,361 Rp 4,115,441.86
Plafond m2 75.18 74,833 Rp 5,625,944.94
Rangka Langit-Langit m2 75.18 255,640 Rp 19,219,015.20
Panel Nama Pelabuhan + Angkur dan Rangka ls 1 7,000,000 Rp 7,000,000.00
Alucopan Warna Biru m2 135.7362 848,816 Rp 115,215,058.34

5 Pekerjaan Elektrikal dan Panel Lampu Sorot Gapura ls 1 5,000,000 Rp 5,000,000.00


SUBTOTAL Rp 286,692,634.62
H Lapangan Penumpukan Semenisasi
Pekerjaan Lapangan Penumpukan Semenisasi m2 2590.785 1,703,764.00 Rp 4,414,086,555.49
SUBTOTAL Rp 4,414,086,555.49
I Lapangan Penumpukan Terbuka
Pekerjaan Lapangan Penumpukan Lapangan Terbuka m2 2087.635 1,703,764.00 Rp 1,703,764.00
SUBTOTAL Rp 1,703,764.00
J Lapangan Parkir
1 Pekerjaan Perkerasan Jalan
a. Batu Pecah CBR > 80% m3 502.848 599,995.00 Rp 301,706,415.36
b. CTB K-100 m3 1340.929 1,121,506.00 Rp 1,503,859,443.56
c. Pasir yang dipadatkan 5cm m3 100.570 265,100.00 Rp 26,661,012.41
d. Paving Blok m2 3352.321 173,800.00 Rp 582,633,466.27
SUBTOTAL Rp 2,414,860,337.60
K Pagar BRC
1 Pekerjaan Tanah
a. Penggalian Tanah untuk Konstruksi m3 233.60 88,000.00 Rp 20,556,800.00
b. Pengurugan Tanah Kembali untuk Konstruksi m3 45.99 66,000.00 Rp 3,035,260.80
c. Pekerjaan buangan sisa galian ke disposal m3 187.61 38,500.00 Rp 7,223,031.20

2 Pekerjaan Fondasi
a. Fondasi Batu Kali m3 201.60 1,075,184.00 Rp 216,757,094.40
b. Aantsamping m3 96.00 602,184.00 Rp 57,809,664.00
c. Urugan Pasir 5 cm m3 32.00 259,600.00 Rp 8,307,200.00

3 Pekerjaan Beton Bertulang


3.1 Pekerjaan Tie Beam / sloof beton
a. Pekerjaan pembesian tie beam kg 4032.00 33,293.00 Rp 134,237,376.00
b. Pekerjaan Bekisting tie beam m2 480.00 174,460.00 Rp 83,740,800.00
c. Pekerjaan Pengecoran Beton K-225 m3 28.80 1,374,635.00 Rp 39,589,488.00

4 Pekerjaan Pemasangan Pagar BRC


a. Pemasangan Pagar BRC m2 1152.00 269,542.00 Rp 310,512,384.00
SUBTOTAL Rp 881,769,098.40
L Lansekap
Pemasangan Rumput m2 16890.18 50,000.00 Rp 844,509,200.00
Penanaman Pohon btg 50.00 600,000.00 Rp 30,000,000.00
SUBTOTAL Rp 874,509,200.00
M Marka dan Kanstein
Pengecatan Marka (Area Parkir ) m' 1391.00 87,500.00 Rp 121,712,500.00
Pengecatan Kanstin + Finis Cat m3 46.91 2,255,489.36 Rp 105,814,027.66
SUBTOTAL Rp 227,526,527.66
N Pekerjaan Signage
Suspenden Sign SS180 bh 2.00 1,570,888.00 Rp 3,141,776.00
Suspenden Sign SS270 bh 1.00 1,570,888.00 Rp 1,570,888.00
Suspenden Sign SS320 bh 1.00 1,570,888.00 Rp 1,570,888.00
Suspenden Sign SS450 bh 1.00 1,570,888.00 Rp 1,570,888.00
VOLUME HARGA SATUAN JUMLAH HARGA
No. URAIAN PEKERJAAN SATUAN
Rp Rp
Sign Titik Berkumpul bh 2.00 1,203,546.00 Rp 2,407,092.00
Flag Mounted FMA28 bh 1.00 570,888.00 Rp 570,888.00
Sign Taxi bh 2.00 1,203,546.00 Rp 2,407,092.00
Sign Parkir bh 2.00 1,203,546.00 Rp 2,407,092.00
Sign Arah Masuk bh 3.00 1,203,546.00 Rp 3,610,638.00
Sign Verboden bh 2.00 1,203,546.00 Rp 2,407,092.00
Papan Nama Terminal bh 1.00 18,600,000.00 Rp 18,600,000.00
Arah Nama Kolom bh 4.00 1,203,546.00 Rp 4,814,184.00
Pintu Darurat bh 1.00 1,570,888.00 Rp 1,570,888.00
SUBTOTAL Rp 46,649,406.00
V PEKERJAAN MEP
A. Pekerjaan Mechanical & Plumbing
A1 Pekerjaan Water Tank (Torn Cap 5000 Lt)
1 Pekerjaan Podasi m³ 5.04 7,489,617.00 Rp37,747,670
2 Pekerjaan pengeboran Sumur Bor hari 7 1,546,050.00 Rp10,822,350
3 pipa pvc 4" AW abu abu (casing Sumur bor) m' 60 83,793.10 Rp5,027,586
4 Pompa Summersible 11/2 PK bh 1 17,800,000.00 Rp17,800,000
5 tower Penyangga Torn kg 2184 65,854.00 Rp143,825,136
6 Torn Cap 5000 liter bh 1 9,212,000.00 Rp9,212,000
SUBTOTAL Rp224,434,742

A2 PEKERJAAN SEPTIC TANK


1 Pekerjaan Pembuatan sumur Resapan bh 4 16,000,000.00 Rp64,000,000
2 Pekerjaan Pembuatan septic Tank m3 16.364 11,715,000.00 Rp191,704,260
SUBTOTAL Rp255,704,260

A3 PEKERJAAN DRAINASE SALURAN


1 Pemasangan saluran Primer (1) U Ditch 500 x 500 x1200 m' 402.24 1,672,183.00 Rp672,618,890
2 Pemasangan saluran Primer (2) U Ditch 400 x 400 x1200 m' 376.8 1,331,183.00 Rp501,589,754
3 Pemasangan saluran sekunder (1) U Ditch 300 x 400 x1200 m' 469.92 1,166,183.00 Rp548,012,715
4 Pemasangan saluran Box Culvert 300 x 400 x1200 m' 18.2 1,806,603.00 Rp32,880,175
SUBTOTAL Rp1,755,101,534
A4 PEKERJAAN AIR BERSIH DAN AIR KOTOR

1 Galian tanah untuk pipa sedalam 1 meter m' 431.85 88,000.00 Rp38,002,800
2 Mengurug kembali Galian Tanah yang dipadatkan m' 376.8 97,680.00 Rp36,805,824
3 Pemasangan saluran distribusi Air Bersih Utama (11/4") m' 334.49 92,941.00 Rp31,087,835
4 Pemasangan saluran Distribusi Air Bersih (1") m' 98.41 49,086.00 Rp4,830,553
5 Pemasangan saluran Pembuangan Air Kotor 4" m' 93.21 178,803.00 Rp16,666,228
6 Pemasangan saluran Pembuangan Air Kotor ke Septic Tank m' 116.22 178,803.00 Rp20,780,485
SUBTOTAL Rp148,173,725
B ELEKTRIKAL
B1 PEMASANGAN KABEL
1 Galian tanah unyuk pipa sedalam 1,5 meter m' 843.7 88,000.00 Rp74,245,600
2 Mengurug kembali Galian Tanah yang dipadatkan m' 843.7 97,680.00 Rp82,412,616
3 Pemasangan Kabel Listrik dari Trafo ke Elctrical Room(Genset Room) m' 316.03 360,482.00 Rp113,923,126
4 Pemasangan Kabel Distribusi ke Panel Area Gedung m' 247 218,799.00 Rp54,043,353
5 Pemasangan Kabel Distribusi dari Panel ke area Gedung m' 156 189,111.00 Rp29,501,316
6 panel sdp untuk tiap area gedung bh 6 9,800,000.00 Rp58,800,000
SUBTOTAL Rp412,926,011

B2 PEMASANGAN KONSTUKSI PJU


1 Pekerjaan pondasi telapak untuk PJU m³ 17.424 7,489,617.00 Rp130,499,087
2 Pemasangan PJU 1 (Flood Lamp & CCTV& Solar Cell) t=10m Unit 5 47,492,511.00 Rp237,462,555
3 Pemasangan PJU 2 ( Led Lamp & Solar Cell) t=7m Unit 17 21,410,820.00 Rp363,983,940
SUBTOTAL Rp731,945,582
C APAR/APAB
1 Pekerjaan pondasi telapak untuk Rumah apar m³ 0.18 7,489,617 Rp1,348,131
2 Lantai Beton m³ 0.294 1,332,673 Rp391,806
3 Pemasangan Rumah Genset Out Door kg 305.6 65,854 Rp20,124,982
4 APAR/APAB Portable Cap 50Kg bh 2 24,500,000 Rp49,000,000
SUBTOTAL Rp70,864,919
D. RUMAH GENSET
1 Fundasi Telapak
a. Galian Tanah m3 39.6 88,000.00 Rp3,484,800
b. Urugan Tanah Kembali m3 26.136 66,000.00 Rp1,724,976
c. Urugan Pasir dan pemadatan m3 17.669 271,920.00 Rp4,804,554
d. Lantai Kerja m3 2.34 1,116,118.00 Rp2,611,716
e. Pekerjaan pembesian fundasi telapak kg 669.20 33,293.00 Rp22,279,676
f. Pekerjaan Bekisting Fundasi Telapak m2 20.26 174,460.00 Rp3,533,862
g. Pekerjaan Pengecoran Beton K-300 m3 3.05 1,436,315.00 Rp4,384,782

3 Tie Beam / sloof


a. Pekerjaan pembesian fundasi telapak kg 606.17 33,293.00 Rp20,181,218
b. Pekerjaan Bekisting Fundasi Telapak m2 33.28 174,460.00 Rp5,806,029
c. Pekerjaan Pengecoran Beton K-300 m3 3.07 1,436,315.00 Rp4,412,360

4 Kolom
Pekerjaan pembesian fundasi telapak kg 423.22 33,293.00 Rp14,090,263
Pekerjaan Bekisting Fundasi Telapak m2 31.20 174,460.00 Rp5,443,152
Pekerjaan Pengecoran Beton K-300 m3 2.25 1,436,315.00 Rp3,231,709
VOLUME HARGA SATUAN JUMLAH HARGA
No. URAIAN PEKERJAAN SATUAN
Rp Rp

5 Balok
Pekerjaan pembesian fundasi telapak kg 984.13 33,293.00 Rp32,764,640
Pekerjaan Bekisting Fundasi Telapak m2 70.98 174,460.00 Rp12,383,171
Pekerjaan Pengecoran Beton K-300 m3 7.88 1,436,315.00 Rp11,310,981

6 Slab On Ground
Pekerjaan pembesian fundasi telapak kg 1104.00 33,293.00 Rp36,755,472
Pekerjaan Bekisting Fundasi Telapak m2 7.20 174,460.00 Rp1,256,112
Pekerjaan Pengecoran Beton K-300 m3 5.40 1,436,315.00 Rp7,756,101

7 Lantai Atap Beton


Pekerjaan pembesian fundasi telapak kg 1806.20 33,293.00 Rp60,133,817
Pekerjaan Bekisting Fundasi Telapak m2 161.93 174,460.00 Rp28,250,308
Pekerjaan Pengecoran Beton K-300 m3 18.30 1,436,315.00 Rp26,284,565

8 Pemasangan Dinding Bata Merah m2 118.58 288,908.00 Rp34,258,711


9 Plesteran m2 237.16 82,715.00 Rp19,616,689
10 Acian m2 237.16 38,720.00 Rp9,182,835
11 Pengecatan interior m2 177.87 56,478.00 Rp10,045,742
12 Pengecatan exterior m2 177.87 56,478.00 Rp10,045,742
13 Pintu stainless bh 1.00 13,520,980.00 Rp13,520,980
14 Jendela Jalusi bh 2.00 2,520,980.00 Rp5,041,960
15 Elektrikal
Lampu downlight led 36 watt bh 4.00 218,811.45 Rp875,246
lampu led SL 16 watt bh 6.00 89,768.80 Rp538,613
MCB Box 4 group bh 1.00 426,834.10 Rp426,834
Exhaust fan bh 2.00 1,000,000.00 Rp2,000,000
Foto cell bh 1.00 155,000.00 Rp155,000
saklar double bh 1.00 67,659.00 Rp67,659
Stop kontak bh 1.00 90,990.00 Rp90,990
KWH meter PLN 1 fasa 4400 VA bh 1.00 4,997,033.58 Rp4,997,034
Genset bh 1.00 160,000,000.00 Rp160,000,000
SUBTOTAL Rp583,748,297
E. SISTEM PENAMPUNGAN AIR HUJAN (SPAH)
1 Pemasangan Bowplank m1 92.00 85,800.00 Rp7,893,600
2 Galian Tanah m3 252.00 88,000.00 Rp22,176,000
3 Urugan Pasir dan pemadatan m3 6.72 358,160 Rp2,406,835
4 Pasangan Fundasi Batu Kali m3 122.04 1,075,184.00 Rp131,215,455
5 Pengecoran Mutu Beton K-175 m3 2.69 1,332,673.00 Rp3,582,225
SUBTOTAL Rp167,274,116
REKAPITULASI
ANALISIS HARGA SATUAN PEKERJAAN DERMAGA (AHS)
DETAILED ENGINEERING DESIGN (DED)
SISI DARAT PELABUHAN TANJUNG MOCO - PROVINSI KEPULAUAN RIAU

JENIS PEKERJAAN SATUAN HARGA TOTAL

PEKERJAAN PERSIAPAN
Mobilisasi dan Demobilisasi Peralatan Lump Sum 1,387,686,149.00
Pengukuran dan Positioning Lump Sum 51,480,000.00
Direksi Keet dan Gudang Lump Sum 1,776,500.00
Keselamatan Kerja Lump Sum 42,294,120.00
Pelaporan dan Dokumentasi Lump Sum 190,978,857.00
Pemagaran sementara dari seng gelombang t=2m Unit 469,000.00

PEKERJAAN PEMATANGAN LAHAN


Pembersihan Lahan (Grubbing & Clearing) m2 35,893.00
Pembersihan Lahan (Stripping, t=0,2 m) m2 62,533.00

PEKERJAAN JALAN AKSES PENGHUBUNG/PERKERASAN JALAN


Pemasangan Paving Block K-500, t=10cm m2 173,800.00
Batu Pecah CBR >80% m3 599,995.00
CTB K.100 m3 1,121,506.00
Pasir yang dipadatkan m3 265,100.00

PEKERJAAN BETON
Pengecoran Beton (K.300) insitu beton m3 1,436,315.00
Pengecoran Beton (K.225) insitu beton m3 1,374,635.00
Pengecoran Beton (K.175) insitu beton m3 1,332,673.00
Pengecoran Beton (K.125) insitu beton m3 1,232,520.00
Pengecoran Beton (K.100) insitu beton m3 1,116,118.00
Membuat 1 kg Konstruksi Baja WF kg 28,050.00
Pekerjaan Pembesian untuk Beton Insitu Kg 33,293.00
Pekerjaan Bekisting untuk Beton Insitu m2 174,460.00
Handling dan instal Beton Pracetak m3

PEKERJAAN TANAH (FASILITAS DARAT)


Menggali tanah biasa sedalam 1 meter tiap 1 m³ (AHSP Cipta Karya-2013 A. 2.3.1.1) m3 88,000.00
Pengurugan Kembali 1 m3 Galian Dihitung dari 1/3 kali (AHSP A.2.3.1.9) m3 66,000.00
(K3) Pembuangan Tanah Sejauh 30 meter AHSP A.2.3.1.8 m3 38,500.00
Pengukuran dan Pemasangan Bouwplank m' (sni HSP Permen PUPR 28-2016) m' 85,800.00
Membuat lantai kerja beton mutu f'c=7,4 MPa (K-100) slump (3-6)cm w/c=0,87 tiap 1 m³ (SNI 7394:2008 An
6.4.) m3 1,116,118.00

Pemasangan Batu Kosong (Aanstamping) AHSP 1.3.2.1.9 m3 602,184.00


Memasang pondasi batu belah 1 PC : 4 PP tiap 1 m³ (AHSP Cipta Karya-2013 A.3.2.1.2)
m3 1,075,184.00

Mengurug pasir urug tiap 1 m³ (AHSP Cipta Karya-2013 A. 2.3.1.11) m3 259,600.00


Memasang dinding bata merah (5x11x22) cm tebal ½ bata, 1 PC : 2 PP tiap 1 m² m2 288,908.00

Memasang plesteran 1 PC : 3 PP tebal 15 mm tiap 1 m² (AHSP Cipta Karya-2013 A.4.4.2.3) m2 82,715.00

Memasang acian tiap 1 m² (AHSP Cipta karya-2013 A.4.4.2.27) m2 38,720.00


Memasang konstruksi atap rangka baja ringan tiap 1 m² m2 258,500.00
Memasang atap asbes gelomban tiap 1 m² (3 x 1,05 ) 4mm m2 64,361.00
Memasang dinding keramik (20 x 40) cm tiap 1 m² (AHSP Cipta Karya-2016 A.4.4.3.54.a)
m2 353,698.00

Pemasangan 1 m2 Kaca Cermin Tebal 5mm (AHSP A.4.6.2.20) m2 190,784.00


1 m² Pasangan Keramik Lantai 60x60 cm (modifikasi AHSP Cipta karya-2013 A.4.4.3.1)
m2 279,000.00

1 m² Pasangan Keramik Lantai 50x50 cm (AHSP Cipta Karya-2013 A.4.4.3.4) m2 241,000.00


1 m² Pasangan Keramik Lantai 40x40 cm (AHSP Cipta Karya-2013 A.4.4.3.4) m2 221,000
Memasang langit-langit gypsum board 9 mm tiap 1 m² (AHSP Cipta Karya-2013 A.4.5.1.7) m2 74,833
Memasang list langit-langit kayu profil tiap 1 m' (SNI 2839:2008 An 6.10.) m' 73,315
1 m2 Alucopan m2 848,816
Memasang 1 m2 rangka besi hollow 1 x 40.40.2mm, modul 60 x 60 cm, plafon ( AHSP Cipta Karya-2013 A.4.2 m2 255,640.00
Pengecatan langit-langit dengan roll, plamur + 2 lapis cat KW 2 tiap 1 m² (Pt-T-38-2000-C Tabel 1 No 7) m2 42,966.00
REKAPITULASI
ANALISIS HARGA SATUAN PEKERJAAN DERMAGA (AHS)
DETAILED ENGINEERING DESIGN (DED)
SISI DARAT PELABUHAN TANJUNG MOCO - PROVINSI KEPULAUAN RIAU

JENIS PEKERJAAN SATUAN HARGA TOTAL


Pengecatan bidang tembok dengan roll 2 lapis cat Dulux/ICI tiap 1 m² m2 56,478
Memasang atap genteng metal tiap 1 m² (AHSP Cipta Karya-2013 A.4.5.2.32) m2 127,600
Memasang nok genteng metal tiap 1 m' (AHSP Cipta Karya-2013 A.4.5.2.36) m' 93,335.00
1 Titik pasang lampu T8 LED 16 Watt bh 153,000.00
1 Titik pasang lampu Downlight bh 141,000
1 Titik pasang lampu Spotlight bh 147,000
Memasang 1 buah Stop kontak 1ph, 10A bh 90,990
Memasang 1 buah Saklar ganda bh 67,659
Memasang 1 buah Saklar tunggal bh 48,995.00
Memasang 1 buah kloset duduk/monoblok setara INA (sedang) (RSNI T-15-2002 An 6.1.) bh 2,781,306.00
Memasang 1 buah wastafel (RSNI T-15-2002 An 6.5.) bh 965,448.00
Memasang 1 buah bak cuci piring stainlessteel (AHSP Cipta Karya-2013 A.5.1.1.12) bh 1,421,288.00
Memasang 1 buah jet washer (RSNI T-15-2002 An 6.35.) bh 491,488.00
Memasang 1 buah shower spreay (RSNI T-15-2002 An 6.35.) bh 287,988.00
Memasang 1 floor drain stainless (RSNI T-15-2002 An 6.36.) bh 381,480.00
Memasang kaca cermin tebal 5 mm tiap 1 m² (AHSP Cipta Karya-2013 A.4.6.2.20) bh 294,910.00
Memasang 1 buah kran dia 3/4" atau 1/2" stainless (RSNI T-15-2002 An 6.35.) bh 134,805.00
Memasang 1 buah urinoir U57 WW bh 3,005,288.00
Membuat 1 unit pintu stainless tebal 1,2 mm, rangka besi bh 13,520,980.00
1 set ventliasi jalusi bh 2,520,980.00
Pintu (1800x2600 mm) Alumunium + Kaca bh 4,503,063.00
Pintu (2200x2600mm) Alumunium + Kaca bh 4,566,760.00
Pintu (900x2600mm) Alumunium + Kaca bh 3,312,375.00
Pintu (700x2200mm) Alumunium bh 2,426,600.00
Jendela (4740x2502mm) Alumunium + Kaca bh 10,849,102.00
Jendela (1700x1600mm) Alumunium + Kaca bh 3,547,495.00
Jendela (1700x1600mm) Alumunium + Kaca + Void bh 3,461,475.00
Jendela J4 (950x600mm) Alumunium + Kaca bh 1,141,668.00
Pintu (2200x2980mm) Alumunium + Kaca bh 4,994,564.00
PJ (2525x2200mm) Alumunium + Kayu Double + Kaca bh 5,932,290.00
Jendela (870x600mm) Alumunium + Kaca bh 1,102,068.00
JS1 (1000x3000mm) Alumunium + Kaca+ Ornamen bh 3,773,302.00
Jendela JS2 (1660x4430mm) Alumunium + Kayu Double bh 6,469,697.00
Membuat 1 unit pintu stainless tebal 1,2 mm 4m x 4m rangka besi hollow bh 32,703,121.00
Jendela (820 x 2200mm) Alumunium + Kaca bh 2,609,499.00
Jendela (745 x 2000mm) Alumunium + Kaca bh 2,700,225.00
Jendela J7 (1438X1819mm) Kayu Double Multi Lapis HPL + Kaca bh 3,035,040.00
Pintu (2763x1325)mm Alumunium + Multi Lapis HPL+ Kaca bh 3,152,288.00
Memasang lisplank Kayu lebar 50 cm tebal 6mm m' 201,135.00
1m2 Pagar BRC Lengkap Dengan Tiang D6mm m2 269,542.00

PEKERJAAN MEP
Fondasi Telapak dalam 1m3 m3 7,489,617.00
pengeboran sumur bor kedalaman sedang hari 1,546,050.00
analisa 1 kg besi profil kg 65,854.00
PEMASANGAN U DITCH 500 X 500 (SNI No.28 :2016 ) Per m² m2 1,672,183.00
PEMASANGAN U DITCH 400 X 400 (SNI No.28 :2016 ) Per m² m2 1,331,183.00
PEMASANGAN U DITCH 300 X 400 (SNI No.28 :2016 ) Per m² m2 1,166,183.00
PEMASANGAN BOX CULVERT 400 X 400 (SNI No.28 :2016 ) Per m² m2 1,806,603.00
Menggali tanah biasa sedalam 1 meter tiap 1 m³ (AHSP Cipta Karya-2013 A. 2.3.1.1) m3 88,000.00
Mengurug kembali tanah biasa yang dipadatkan tiap 1 m³ (AHSP Cipta Karya-2013 A.) m3 97,680.00
Memasang Pipa 1,1/4" PVC AW m 92,941.00
Memasang Pipa 1" PVC AW m 49,086.00
Memasang Pipa Air Kotor 4" PVC AW m 178,803.00
Pemasangan Listrik Kabel NYY 4x25mm m 360,482.00
REKAPITULASI
ANALISIS HARGA SATUAN PEKERJAAN DERMAGA (AHS)
DETAILED ENGINEERING DESIGN (DED)
SISI DARAT PELABUHAN TANJUNG MOCO - PROVINSI KEPULAUAN RIAU

JENIS PEKERJAAN SATUAN HARGA TOTAL


Pemasangan Listrik Kabel NYY 4x16mm m 218,799.00
Pemasangan Listrik Kabel NYY 4x10mm m 189,111.00
Pemasangan PJU Tenaga Surya (PJU 1) bh 47,492,511.00
Pemasangan PJU Tenaga Surya (PJU2) bh 21,410,820.00
1 Titik pasang lampu Downlight LED 36 wat bh 218,811.45
1 Titik pasang lampu Downlight LED SL 16 Watt bh 89,768.80
Memasang 1 buah Panel unit (P-Unit) bh 426,834.10
Memasang 1 buah KWH meter 1 phase bh 4,997,033.58
Pekerjaan Septic Tank 2 m3 (PM 78 2014) m3 11,715,000.00
Mengurug pasir urug tiap 1 m³ yang dipadatkan m3 271,920.00
BADAN PENGUSAHAAN KAWASAN
PERDAGANGAN BEBAS DAN PELABUHAN BEBAS BINTAN
WILAYAH KOTA TANJUNGPINANG

RENCANA ANGGARAN BIAYA ( R A B )


PENYUSUNAN DED SISI DARAT
PELABUHAN TANJUNG MOCO

VOLUME HARGA SATUAN JUMLAH HARGA


No. URAIAN PEKERJAAN SATUAN
Rp Rp
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi Peralatan Ls 1.00 720,609,693.75 Rp 720,609,693.75
2 Pengukuran dan Positioning Ls 1.00 113,720,625.00 Rp 113,720,625.00
3 PDA Test Ls 1.00 114,099,693.75 Rp 114,099,693.75
4 Direksi Keet dan Gudang Ls 1.00 189,837,630.00 Rp 189,837,630.00
5 Penerangan dan Keselamatan Kerja Ls 1.00 128,883,375.00 Rp 128,883,375.00
6 Pelaporan dan Dokumentasi Ls 1.00 280,510,875.00 Rp 280,510,875.00
SUBTOTAL Rp 1,547,661,892.50
II PEKERJAAN PEMATANGAN LAHAN
1 Pekerjaan Pematangan Lahan
Pembersihan Lahan (Grubbing & Clearing) m2 35000 24,841.12 Rp 869,439,200.00
Pembersihan Lahan (Stripping, t=1 m) m2 35000 55,496.56 Rp 1,942,379,586.23
SUBTOTAL Rp 2,811,818,786.23
III PERKERASAN JALAN DAN DRAINASE
1 Pekerjaan Jalan dan Drainase m2 7056.000 #REF! #REF!
SUBTOTAL #REF!
IV FASILITAS BANGUNAN DARAT
A KANTOR PELABUHAN + KANTIN
1 Pekerjaan Tanah
Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 33.75 89,100.00 Rp 3,007,125.00
Pekerjaan urugan kembali (backfill) m3 11.580 44,000.00 Rp 509,520.00
Pekerjaan buangan sisa galian ke disposal m3 22.170 38,126.00 Rp 845,253.42

2 Pekerjaan Pondasi Tapak


Lantai Kerja m3 1.92 1,355,172.42 Rp 2,601,931.04

3 Pekerjaan Beton K-175


Lantai Kerja m3 12.626 1,355,172.42 Rp 17,110,666.11

4 Pekerjaan Beton Bertulang


4.1 Pekerjaan Fundasi Telapak
a. Pekerjaan pembesian fundasi telapak kg 1140.000 Rp -
b. Pekerjaan Bekisting Fundasi Telapak m2 63.700 Rp -
c Pekerjaan Pengecoran Beton K-300 m3 20.250 Rp -

4.2 Pekerjaan Tie Beam / sloof beton Rp -


a. Pekerjaan pembesian tie beam kg 1934.292 -
b. Pekerjaan Bekisting tie beam m2 101.400 -
c Pekerjaan Pengecoran Beton K-225 m3 7.020
Rp -
4.3 Pekerjaan Kolom Beton Rp -
a. Pekerjaan pembesian kolom kg 749.820 Rp -
b. Pekerjaan Bekisting kolom m2 78.000 Rp -
c Pekerjaan Pengecoran Beton K-225 m3 3.600 Rp -
Rp -
4.4 Pekerjaan Balok Beton Rp -
a. Pekerjaan pembesian balok kg 1934.292
b. Pekerjaan Bekisting balok m2 101.400 Rp -
c Pekerjaan Pengecoran Beton K-225 m3 7.020 Rp -

4.5 Pelat Lantai


a. Pekerjaan Beton K-250 kg 3787.857 Rp -
b. Pekerjaan Pembesian m2 252.524 Rp -
c Pekerjaan Bekisting m3 30.303 Rp -

5 Pekerjaan Rangka Atap Baja Ringan


5.1 Pemasangan Rangka Baja ringan m2 284.76 350,000.00 Rp 99,666,000.00

6 Pekerjaan Arsitektur
6.1 Pekerjaan Dinding
a. Pekerjaan Dinding 1/2 Bata m2 294.722 257,191.72 Rp 75,800,059.55
b. Plesteran m2 589.444 52,701.00 Rp 31,064,288.24
c Acian m2 589.444 48,328.50 Rp 28,486,944.35
d. Keramik Dinding Toilet 200x400mm m2 60.445
e. Kaca 800 x 1800 m2 1.44

6.2 Pekerjaan Lantai


a. Keramik Glossy 500x500mm m2 188.795 492,353.28 Rp 92,953,838.24
b. Keramik non slip 400x400mm m2 11.205 172,396.57 Rp 1,931,703.61
c. Lantai Plesteran K-125 m2 103.84 1,300,000.00 Rp 134,992,000.00

6.3 Pekerjaan Plafon


a. Plafon Gypsum 9 mm m2 293.8795 153,000.00 Rp 44,963,563.50

6.4 Pekerjaan Pintu dan Jendela


a. Pintu P1 (1800x2600 mm) Alumunium + Kaca unit 1 3,300,000.00 Rp 3,300,000.00
b. Pintu P2 (2200x2600mm) Alumunium + Kaca unit 1 3,500,000.00 Rp 3,500,000.00
c. Pintu P3 (900x2600mm) Alumunium + Kaca unit 8 2,500,000.00 Rp 20,000,000.00
d. Pintu P4 (700x2200mm) Alumunium unit 4 2,500,000.00 Rp 10,000,000.00
e. Jendela J1 (4740x2502mm) Alumunium + Kaca unit 1 3,500,000.00 Rp 3,500,000.00
f. Jendela J2 (1700x1600mm) Alumunium + Kaca unit 5 2,500,000.00 Rp 12,500,000.00
g. Jendela J3 (1700x1600mm) Alumunium + Kaca unit 2 2,500,000.00 Rp 5,000,000.00
h. Jendela J4 (950x600mm) Alumunium + Kaca unit 6 500,000.00 Rp 3,000,000.00

6.5 Pekerjaan Finishing


a. Pengecatan Dinding Interior m2 510.623 45,000.00 Rp 22,978,035.00
b. Pengecatan Dinding Exterior m2 195.339 55,000.00 Rp 10,743,645.00
c. Pengecatan Plafond m2 293.8795 45,000.00 Rp 13,224,577.50

6.6 Pekerjaan Penutup Atap


a. Pemasangan Atap Genteng m2 418.07833 180,000.00 Rp 75,254,099.40
b. Pemasangan Bubung Metal Zincalumn m' 39.63 200,000.00 Rp 7,926,000.00
c. Lisplank m 74.75

7 Pekerjaan Listrik
a. Pas. Lampu LED T8 LED 16W bh 30 125,500.00 Rp 3,765,000.00
b. Pas. Lampu Down light + Fitting bh 9 156,000.00 Rp 1,404,000.00
c. Pek. Pas. Stop Kontak bh 11 25,000.00 Rp 275,000.00
d. Pek. Pas. Saklar Tunggal, setara Philips bh 5 25,000.00 Rp 125,000.00
e. Pek. Pas. Saklar Ganda, setara Philips bh 4 45,000.00 Rp 180,000.00
f. Pas. Lampu Dinding Spotlight Outdoor bh 9 140,000.00 Rp 1,260,000.00

8 Pekerjaan Sanitasi dan Saniter


a. Pas. Closet Duduk + Accessories bh 4 5,316,800.00 Rp 21,267,200.00
b. Pas. Wastafel + Accessories bh 3 3,457,340.00 Rp 10,372,020.00
c. Sink bh 1
d. Pas. Instalasi Air Bersih ls 1 10,500,000.00 Rp 10,500,000.00
e. Pas. Instalasi Air Kotor ls 1 8,579,300.00 Rp 8,579,300.00
f. Pek. Septictank ls 1 17,558,000.00 Rp 17,558,000.00
SUBTOTAL Rp 800,144,769.98
B KANTOR KSOP
1 Pekerjaan Tanah
Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 105 89,100.00 Rp 9,355,500.00
Pekerjaan urugan kembali (backfill) m3 16.438 44,000.00 Rp 723,250.00
Pekerjaan buangan sisa galian ke disposal m3 88.563 38,126.00 Rp 3,376,533.88

2 Pekerjaan Pondasi Tapak


Lantai Kerja m3 5.8675 1,355,172.42 Rp 7,951,474.16

3 Pekerjaan Beton K-175


Lantai Kerja m3 39.484375 1,355,172.42 Rp 53,508,135.89

4 Pekerjaan Beton Bertulang Rp -


4.1 Pekerjaan Fundasi Telapak 1 Rp -
a. Pekerjaan pembesian fundasi telapak kg 1519.920 Rp -
b. Pekerjaan Bekisting Fundasi Telapak m2 78.000 Rp -
c Pekerjaan Pengecoran Beton K-300 m3 27.000 Rp -

4.2 Pekerjaan Fundasi Telapak 2 Rp -


a. Pekerjaan pembesian fundasi telapak kg 1980.000 Rp -
b. Pekerjaan Bekisting Fundasi Telapak m2 78.000 Rp -
c Pekerjaan Pengecoran Beton K-300 m3 36.000
Rp -
4.3 Pekerjaan Tie Beam 1 Rp -
a. Pekerjaan pembesian tie beam kg 1598.400 Rp -
b. Pekerjaan Bekisting tie beam m2 57.720
c Pekerjaan Pengecoran Beton K-225 m3 5.328 Rp -
Rp -
4.4 Pekerjaan Tie Beam 2 Rp -
a. Pekerjaan pembesian tie beam kg 3183.792
b. Pekerjaan Bekisting tie beam m2 146.640 Rp -
c Pekerjaan Pengecoran Beton K-225 m3 10.152 Rp -
Rp -
4.5 Pekerjaan Tie Beam TB1A Rp -
a. Pekerjaan pembesian tie beam kg 947.412 Rp -
b. Pekerjaan Bekisting tie beam m2 31.850 Rp -
c Pekerjaan Pengecoran Beton K-225 m3 3.675 Rp -

4.6 Pekerjaan Tie Beam TBA Rp -


a. Pekerjaan pembesian tie beam kg 132.390 Rp -
b. Pekerjaan Bekisting tie beam m2 7.800 Rp -
c Pekerjaan Pengecoran Beton K-225 m3 0.540
Rp -
4.7 Pekerjaan Kolom Beton Rp -
a. Pekerjaan pembesian kolom kg 4724.370 Rp -
b. Pekerjaan Bekisting kolom m2 227.500
c Pekerjaan Pengecoran Beton K-300 m3 11.813 Rp -
Rp -
4.8 Pekerjaan Balok Beton B1 Rp -
a. Pekerjaan pembesian balok kg 1604.316
b. Pekerjaan Bekisting balok m2 76.960 Rp -
c Pekerjaan Pengecoran Beton K-300 m3 5.328 Rp -
Rp -
4.9 Pekerjaan Balok Beton B2 Rp -
a. Pekerjaan pembesian balok kg 3312.312 Rp -
b. Pekerjaan Bekisting balok m2 190.125 Rp -
c Pekerjaan Pengecoran Beton K-300 m3 10.530 Rp -

4.10 Pekerjaan Balok Beton B1A Rp -


a. Pekerjaan pembesian balok kg 950.376 Rp -
b. Pekerjaan Bekisting balok m2 43.225 Rp -
c Pekerjaan Pengecoran Beton K-300 m3 3.675
Rp -
4.11 Pekerjaan Balok Beton BA Rp -
a. Pekerjaan pembesian balok kg 363.499 Rp -
b. Pekerjaan Bekisting balok m2 23.400
c Pekerjaan Pengecoran Beton K-300 m3 2.160 Rp -
Rp -
4.12 Pekerjaan Slab / Plat Lantai Rp -
a. Pekerjaan pembesian plat lantai kg 6008.796
b. Pekerjaan Bekisting kolom m2 780.000 Rp -
c Pekerjaan Pengecoran Beton K-300 m3 90.480
Rp -
4.13 Pekerjaan Kolom Beton Lantai 2 (K2) Rp -
a. Pekerjaan pembesian kolom kg 4724.370 Rp -
b. Pekerjaan Bekisting kolom m2 227.500
c Pekerjaan Pengecoran Beton K-225 m3 11.813 Rp -
Rp -
4.14 Pekerjaan Balok Beton Lantai 2 B2 Rp -
a. Pekerjaan pembesian balok kg 4629.516
b. Pekerjaan Bekisting balok m2 260.260 Rp -
c Pekerjaan Pengecoran Beton K-225 m3 16.632 Rp -
Rp -
Pelat Lantai
Pekerjaan Beton K-250 m3 180.659 - Rp -
Pekerjaan Pembesian kg 22582.422 - Rp -
Pekerjaan Bekisting m2 1389.688 - Rp -

5 Pekerjaan Rangka Atap Baja Ringan


Pemasangan Rangka Baja ringan m2 759 350,000.00 Rp 265,650,000.00

6 Pekerjaan Arsitektur
6.1 Pekerjaan Dinding
a. Pekerjaan Dinding 1/2 Bata m2 1701.8 257,191.72 Rp 437,688,877.48
b. Plesteran m2 3403.6 52,701.00 Rp 179,373,123.60
c. Acian m2 3403.6 48,328.50 Rp 164,490,882.60
d. Keramik Dinding 200x400mm m2 61.515 172,396.57 Rp 10,604,975.26
e. Kaca 900 x 1850 mm m2 3.33

6.2 Pekerjaan Lantai Rp -


a. Keramik Glossy 600x600 mm m2 1150.3 492,353.28 Rp 566,353,982.53
b. Keramik non slip 400x400mm m2 49.7 172,396.57 Rp 8,568,109.74

6.3 Pekerjaan Plafon Rp -


a. Plafon Gypsum 9 mm m2 1359 153,000.00 Rp 207,927,000.00

6.4 Pekerjaan Pintu dan Jendela Rp -


a. Pintu P1 (2200x2980mm) Kayu Double Multi Lapis HPL + Kaca unit 8 3,500,000.00 Rp 28,000,000.00

unit 2,500,000.00 Rp 25,000,000.00


b. Pintu P2 (900x2250mm) Alumunium + Kayu Double Multi Lapis HPL 10
c. Pintu P3 (900x2250mm) Alumunium unit 12 2,500,000.00 Rp 30,000,000.00
d. PJ (2525x2200mm) Alumunium + Kayu Double + Kaca unit 6 3,300,000.00 Rp 19,800,000.00
e. Jendela J2 (1700x1600mm) Alumunium + Kaca unit 47 2,500,000.00 Rp 117,500,000.00
f. Jendela J3 (870x600mm) Alumunium +Kaca unit 6 1,250,000.00 Rp 7,500,000.00
g. Jendela JS1 (1000x3080mm) Alumunium + Kayu Double unit 6 2,300,000.00 Rp 13,800,000.00
h. Jendela JS2 (1660x4430mm) Alumunium + Kayu Double unit 2 2,500,000.00 Rp 5,000,000.00

6.5 Pekerjaan Finishing


a. Pengecatan Dinding Interior m2 2733.6 45,000.00 Rp 123,012,000.00
b. Pengecatan Dinding Exterior m2 670 55,000.00 Rp 36,850,000.00
c. Pengecatan Plafond m2 1359 45,000.00 Rp 61,155,000.00

6.5 Pekerjaan Penutup Atap


a. Pemasangan Atap Genteng m2 931.51846 180,000.00 Rp 167,673,322.80
b. Pemasangan Bubung m' 54.92 200,000.00 Rp 10,984,000.00
c. Lisplank m' 126.75

7 Pekerjaan Listrik
a. Pas. Lampu LED T8 LED 16W bh 92 125,500.00 Rp 11,546,000.00
b. Pas. Lampu Down light + Fitting bh 36 156,000.00 Rp 5,616,000.00
c. Pek. Pas. Stop Kontak bh 50 25,000.00 Rp 1,250,000.00
d. Pek. Pas. Saklar Tunggal, setara Philips bh 14 25,000.00 Rp 350,000.00
e. Pek. Pas. Saklar Ganda, setara Philips bh 15 45,000.00 Rp 675,000.00
f. Pas. Lampu Dinding Spotlight Outdoor ttk 28 140,000.00 Rp 3,920,000.00

8 Pekerjaan Sanitasi dan Saniter


a. Pas. Closet Duduk + Accessories bh 10 5,316,800.00 Rp 53,168,000.00
b. Pas. Wastafel + Accessories bh 8 3,457,340.00 Rp 27,658,720.00
c. Urinor bh 6 3,368,000.00 Rp 20,208,000.00
d. Pas. Instalasi Air Bersih ls 1 10,500,000.00 Rp 10,500,000.00
e. Pas. Instalasi Air Kotor ls 1 8,579,300.00 Rp 8,579,300.00
f. Pek. Septictank ls 1 17,558,000.00 Rp 17,558,000.00
SUBTOTAL Rp 2,722,875,187.93
C. Gudang Pelabuhan
1 Pekerjaan Tanah
Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 30.6875 89,100.00 Rp 2,734,256.25
Pekerjaan urugan kembali (backfill) m3 17.286 44,000.00 Rp 760,562.00
Pekerjaan buangan sisa galian ke disposal m3 13.402 38,126.00 Rp 510,964.65

2 Pekerjaan Pondasi Tapak


Lantai Kerja m3 1.210 1,355,172.42 Rp 1,639,758.62

3 Pekerjaan Beton K-175


Lantai Kerja m3 37.4525 1,355,172.42 Rp 50,754,594.94
4 Pekerjaan Beton Bertulang
4.1 Pekerjaan Fundasi Telapak + Kolom Pedestal
a. Pekerjaan pembesian fundasi telapak + kolom pedestal kg 1127.520 Rp -
b. Pekerjaan Bekisting Fundasi Telapak + kolom pedestal m2 79.040 Rp -
c. Pekerjaan Pengecoran Beton K-300 m3 12.192 Rp -
d. Angkur D20 bh 100.000
Rp -
4.2 Pekerjaan Tie Beam / sloof Rp -
a. Pekerjaan pembesian tie beam kg 2466.358 Rp -
b. Pekerjaan Bekisting tie beam m2 180.180
c. Pekerjaan Pengecoran Beton K-300 m3 20.790 Rp -

4.3 Pekerjaan Kolom Baja WF kg 5725.200 Rp -


Rp -
4.4 Pekerjaan Balok Baja WF kg 2815.920 Rp -

4.5 Pelat Lantai


a. Pekerjaan Beton K-250 m3 74.905 - Rp -
b. Pekerjaan Pembesian kg 9363.125 - Rp -
c. Pekerjaan Bekisting m2 749.050 - Rp -

5 Pekerjaan Rangka Atap


a. Purlin P1 CNP.100x50x20x2.3 kg 6312.384 20,764 Rp 131,071,210.33
b. Rafter R1 IWF.200.100.5,5.8S kg 3235.896 20,764 Rp 67,190,589.99
c. Sagrod SG Dimeter 19 kg 315.309824 20,764 Rp 6,547,136.59
d. Trekstang Diameter 10 kg 270.816 20,764 Rp 5,623,260.70

6 Pekerjaan Arsitektur
6.1 Pekerjaan Dinding
a. Pekerjaan Dinding 1/2 Bata m2 660 257,191.72 Rp 169,746,538.45
b. Plesteran m2 1320 52,701.00 Rp 69,565,320.00
c. Acian m2 1320 48,328.50 Rp 63,793,620.00

6.2 Pekerjaan Lantai


a. Plesteran K-125 m2 749.05 1,300,000.00 Rp 973,765,000.00

6.3 Pekerjaan Plafon


a. Plafon Gypsum 9 mm m2 749.05 153,000.00 Rp 114,604,650.00

6.4 Pekerjaan Pintu dan Jendela


a. Pintu P1 (4000x4000) Plat Besi unit 2 18,400,000.00 Rp 36,800,000.00
b. Jendela J1 (2200x820mm) unit 12 2,500,000.00 Rp 30,000,000.00
c. Jendela J2 (2000x745mm) Alumunium unit 4 2,300,000.00 Rp 9,200,000.00

6.5 Pekerjaan Finishing


a. Pengecatan Dinding Interior m2 660 45,000.00 Rp 29,700,000.00
b. Pengecatan Dinding Exterior m2 660 55,000.00 Rp 36,300,000.00
c. Pengecatan Plafond m2 749.05 45,000.00 Rp 33,707,250.00

6.6 Pekerjaan Penutup Atap


a. Pemasangan Atap m2 446.6209 180,000.00 Rp 80,391,762.00
b. Pemasangan Bubung m' 42.65 200,000.00 Rp 8,530,000.00

7 Pekerjaan Listrik
a. Pas. Lampu LED T8 LED 16W bh 24 125,500.00 Rp 3,012,000.00
b. Pek. Pas. Stop Kontak bh 6 25,000.00 Rp 150,000.00
c. Pek. Pas. Saklar Tunggal bh 3 25,000.00 Rp 75,000.00
d. Pas. Lampu Spotlight ttk 6 140,000.00 Rp 840,000.00
SUBTOTAL Rp 1,927,013,474.53
D Kantor Imigrasi, Karantina, K3, Bea Cukai
1 Pekerjaan Tanah
Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 30.72 89,100.00 Rp 2,737,152.00
Pekerjaan urugan kembali (backfill) m3 9.582 44,000.00 Rp 421,608.00
Pekerjaan buangan sisa galian ke disposal m3 21.138 38,126.00 Rp 805,907.39

2 Pekerjaan Pondasi Tapak


Lantai Kerja m3 1.536 1,355,172.42 Rp 2,081,544.83

3 Pekerjaan Beton K-175


Lantai Kerja m3 5.34375 1,355,172.42 Rp 7,241,702.60

4 Pekerjaan Beton Bertulang


4.1 Pekerjaan Fundasi Telapak
Pekerjaan pembesian fundasi telapak kg 912.000 Rp -
Pekerjaan Bekisting Fundasi Telapak m2 46.800 Rp -
Pekerjaan Pengecoran Beton K-300 m3 16.200 Rp -

Pekerjaan Tie Beam / sloof beton Rp -


Pekerjaan pembesian tie beam kg 930.012 Rp -
Pekerjaan Bekisting tie beam m2 49.140 Rp -
Pekerjaan Pengecoran Beton K-225 m3 3.402
Rp -
Pekerjaan Kolom Beton Rp -
Pekerjaan pembesian kolom kg 545.080 Rp -
Pekerjaan Bekisting kolom m2 56.160
Pekerjaan Pengecoran Beton K-225 m3 2.592 Rp -

Pekerjaan Balok Beton


Pekerjaan pembesian balok kg 930.012
Pekerjaan Bekisting balok m2 49.140 Rp -
Pekerjaan Pengecoran Beton K-225 m3 3.402
Rp -
Pelat Lantai
Pekerjaan Beton K-250 m3 16.031 - Rp -
Pekerjaan Pembesian kg 2003.906 - Rp -
Pekerjaan Bekisting m2 106.875 - Rp -

5 Pekerjaan Rangka Atap


Pemasangan Rangka Baja ringan IWF 150x75x5x7 m2 79.326 350,000.00 Rp 27,764,100.00
Trekstang Diameter 12 m' 81.84 Rp -

6 Pekerjaan Arsitektur
6.1 Pekerjaan Dinding
a. Pekerjaan Dinding 1/2 Bata m2 159 257,191.72 Rp 40,893,484.26
b. Plesteran m2 318 52,701.00 Rp 16,758,918.00
c. Acian m2 318 48,328.50 Rp 15,368,463.00
d. Keramik Dinding m2 42.39 172,396.57 Rp 7,307,890.78
e. Kaca 560 x 840 m2 4.704 100,000.00 Rp 470,400.00

6.2 Pekerjaan Lantai


a. Keramik Glossy 600x600mm m2 60 492,353.28 Rp 29,541,197.04
b. Keramik non slip 400x400mm m2 15 172,396.57 Rp 2,585,948.61

6.3 Pekerjaan Plafon


a. Plafon Gypsum 9 mm m2 14.75322 153,000.00 Rp 2,257,242.66

6.4 Pekerjaan Pintu dan Jendela


a. Pintu P1 (900x2600mm) Alumunium + Kaca unit 5 2,500,000.00 Rp 12,500,000.00
b. Pintu P2 (700x2200mm) Alumunium unit 2 2,500,000.00 Rp 5,000,000.00
c. Jendela J1 (1700x2000mm) Alumunium + Kaca unit 4 2,500,000.00 Rp 10,000,000.00
d. Jendela J2 (870x600mm) Alumunium +Kaca unit 6 1,250,000.00 Rp 7,500,000.00

6.5 Pekerjaan Finishing


a. Pengecatan Dinding Interior m2 228 45,000.00 Rp 10,260,000.00
b. Pengecatan Dinding Exterior m2 120 55,000.00 Rp 6,600,000.00
c. Pengecatan Plafond m2 14.75322 45,000.00 Rp 663,894.90

6.6 Pekerjaan Penutup Atap


a. Pemasangan Atap Genteng m2 160.85093 180,000.00 Rp 28,953,167.40
b. Pemasangan Bubung Metal Zincalumn m' 32.981 200,000.00 Rp 6,596,200.00

7 Pekerjaan Listrik
a. Pas. Lampu LED T8 LED 16W bh 12 125,500.00 Rp 1,506,000.00
b. Pas. Lampu Down light + Fitting bh 6 156,000.00 Rp 936,000.00
c. Pek. Pas. Stop Kontak bh 8 25,000.00 Rp 200,000.00
d. Pek. Pas. Saklar Tunggal bh 5 25,000.00 Rp 125,000.00
e. Pek. Pas. Saklar Ganda, setara Philips bh 1 45,000.00 Rp 45,000.00
f. Pas. Lampu Spotlight ttk 5 140,000.00 Rp 700,000.00

8 Pekerjaan Sanitasi dan Saniter


a. Pas. Closet Duduk + Accessories bh 2 5,316,800.00 Rp 10,633,600.00
b. Pas. Wastafel + Accessories bh 1 3,457,340.00 Rp 3,457,340.00
c. Urinoir bh 3 3,368,000.00 Rp 10,104,000.00
d. Pas. Instalasi Air Bersih ls 1 10,500,000.00 Rp 10,500,000.00
e. Pas. Instalasi Air Kotor ls 1 8,579,300.00 Rp 8,579,300.00
f. Septictank ls 1 17,558,000.00 Rp 17,558,000.00
SUBTOTAL Rp 308,653,061.48
E Pos Jaga
1 Pekerjaan Tanah
Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 11.2 89,100.00 Rp 997,920.00
Pekerjaan urugan kembali (backfill) m3 5.040 44,000.00 Rp 221,760.00
Pekerjaan buangan sisa galian ke disposal m3 6.160 38,126.00 Rp 234,856.16

2 Pekerjaan Pondasi Batu Kali


Pondasi Batu Kali m3 4.2 1,059,459.50 Rp 4,449,729.88
Pasir Urug m3 0.700 44,000.00 Rp 30,800.00

3 Pekerjaan Beton K-175


Lantai Kerja m3 0.7 1,355,172.42 Rp 948,620.69

4 Pekerjaan Beton Bertulang


4.1 Pekerjaan Tie Beam / sloof beton
a. Pekerjaan pembesian tie beam kg 417.247 Rp -
b. Pekerjaan Bekisting tie beam m2 21.840 Rp -
c. Pekerjaan Pengecoran Beton K-225 m3 1.260 Rp -
4.2 Pekerjaan Kolom Beton Rp -
a. Pekerjaan pembesian kolom kg 269.136 Rp -
b. Pekerjaan Bekisting kolom m2 28.080 Rp -
c. Pekerjaan Pengecoran Beton K-225 m3 1.296
Rp -
4.3 Pekerjaan Balok Beton Rp -
a. Pekerjaan pembesian balok kg 326.251
b. Pekerjaan Bekisting balok m2 21.840
c. Pekerjaan Pengecoran Beton K-225 m3 1.512

4.4 Pelat Lantai


a. Pekerjaan Beton K-250 m3 3.750 - Rp -
b. Pekerjaan Pembesian kg 468.750 - Rp -
c. Pekerjaan Bekisting m2 25.000 - Rp -

5 Pekerjaan Rangka Atap


Pemasangan Rangka Baja ringan m2 65.61 350,000.00 Rp 22,963,500.00
Trekstang Diameter 12 m 19.52 Rp -

6 Pekerjaan Arsitektur
6.1 Pekerjaan Dinding
a. Pekerjaan Dinding 1/2 Bata m2 84 257,191.72 Rp 21,604,104.89
b. Plesteran m2 168 52,701.00 Rp 8,853,768.00
c. Acian m2 168 48,328.50 Rp 8,119,188.00
d. Dinding Keramik 200x400mm m2 7.56

6.2 Pekerjaan Lantai


a. Keramik Non Glossy 600x600mm m2 21.4 492,353.28 Rp 10,536,360.28
b. Keramik non slip 400x400mm m2 3.6 172,396.57 Rp 620,627.67

6.3 Pekerjaan Plafon


a. Plafon Gypsum 9 mm m2 65.61 153,000.00 Rp 10,038,330.00

6.4 Pekerjaan Pintu dan Jendela


a. Pintu P1 (900x2600mm) Alumunium + Kaca unit 2 2,500,000.00 Rp 5,000,000.00
b. Jendela J2 (1700x2000mm) Alumunium + Kaca unit 1 2,500,000.00 Rp 2,500,000.00
c. Jendela J3 (870x600mm) Alumunium +Kaca unit 1 1,250,000.00 Rp 1,250,000.00

6.5 Pekerjaan Finishing m2


a. Pengecatan Dinding Interior m2 108 45,000.00 Rp 4,860,000.00
b. Pengecatan Dinding Exterior m2 60 55,000.00 Rp 3,300,000.00
c. Pengecatan Plafond m2 65.61 45,000.00 Rp 2,952,450.00
d. Ukiran Kayu m2 1.92 187,500.00 Rp 360,000.00

6.6 Pekerjaan Penutup Atap


a. Pemasangan Atap Genteng m2 66.45164 180,000.00 Rp 11,961,295.20
b. Pemasangan Bubung Metal Zincalumn m' 23.2 200,000.00 Rp 4,640,000.00

7 Pekerjaan Listrik
Pas. Lampu LED T8 LED 16W bh 2 125,500.00 Rp 251,000.00
Pas. Lampu Down light + Fitting bh 5 156,000.00 Rp 780,000.00
Pek. Pas. Stop Kontak bh 2 25,000.00 Rp 50,000.00
Pek. Pas. Saklar Tunggal bh 1 25,000.00 Rp 25,000.00
Pek. Pas. Saklar Ganda, setara Philips bh 2 45,000.00 Rp 90,000.00
Pas. Lampu Spotlight ttk 4 140,000.00 Rp 560,000.00

8 Pekerjaan Sanitasi dan Saniter


Pas. Closet Duduk + Accessories bh 1 5,316,800.00 Rp 5,316,800.00
Pas. Kran Dinding bh 1 175,000.00 Rp 175,000.00
Talang Air m' 32.4 22,000.00 Rp 712,800.00
Pas. Instalasi Air Bersih ls 1 10,500,000.00 Rp 10,500,000.00
Pas. Instalasi Air Kotor ls 1 8,579,300.00 Rp 8,579,300.00
SUBTOTAL Rp 153,483,210.77
F Mushola
1 Pekerjaan Tanah
Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 8 89,100.00 Rp 712,800.00
Pekerjaan urugan kembali (backfill) m3 3.420 44,000.00 Rp 150,480.00
Pekerjaan buangan sisa galian ke disposal m3 4.580 38,126.00 Rp 174,617.08

2 Pekerjaan Pondasi Batu Kali


Pondasi Batu kali m3 3 1,059,459.50 Rp 3,178,378.49
Pasir Urug m3 0.500 44,000.00 Rp 22,000.00

3 Pekerjaan Beton K-175


Lantai Kerja m3 1.25 1,355,172.42 Rp 1,693,965.52

4 Pekerjaan Beton Bertulang


4.1 Pekerjaan Tie Beam / sloof beton
a. Pekerjaan pembesian tie beam kg 297.739 Rp -
b. Pekerjaan Bekisting tie beam m2 15.600 Rp -
c. Pekerjaan Pengecoran Beton K-225 m3 1.080 Rp -

4.2 Pekerjaan Kolom Beton Rp -


a. Pekerjaan pembesian kolom kg 177.648 Rp -
b. Pekerjaan Bekisting kolom m2 18.720 Rp -
c. Pekerjaan Pengecoran Beton K-225 m3 0.864
Rp -
4.3 Pekerjaan Balok Beton Rp -
a. Pekerjaan pembesian balok kg 232.735 Rp -
b. Pekerjaan Bekisting balok m2 15.600
c. Pekerjaan Pengecoran Beton K-225 m3 1.080

4.4 Pelat Lantai


a. Pekerjaan Beton K-250 m3 4.256 - Rp -
b. Pekerjaan Pembesian kg 532.031 - Rp -
c. Pekerjaan Bekisting m2 25.000 - Rp -

5 Pekerjaan Rangka Atap


a. Pemasangan Rangka Baja ringan IWF 150x75x5x7 m2 65.61 350,000.00 Rp 22,963,500.00
Trekstang Diameter 12 m 19.52 Rp -

6 Pekerjaan Arsitektur
6.1 Pekerjaan Dinding
a. Pekerjaan Dinding 1/2 Bata m2 62.575 257,191.72 Rp 16,093,772.19
b. Plesteran m2 125.15 52,701.00 Rp 6,595,530.15
c. Acian m2 125.15 48,328.50 Rp 6,048,311.78
d. Keramik Dinding m2 5.15 172,396.57 Rp 887,842.36

6.2 Pekerjaan Lantai


a. Keramik Glossy 600x600mm m2 26.58625 492,353.28 Rp 13,089,827.50
b. Keramik Non Slip 400x400mm m2 1.789 172,396.57 Rp 308,374.37

6.3 Pekerjaan Plafon


a. Plafon Gypsum 9 mm m2 65.61 153,000.00 Rp 10,038,330.00

6.4 Pekerjaan Pintu dan Jendela


a. Jendela J7 (1438X1819mm) Kayu Double Multi Lapis HPL + Kaca unit 4 3,500,000.00 Rp 14,000,000.00
b. Pintu (2763x1325)mm unit 1 3,750,000.00 Rp 3,750,000.00

6.5 Pekerjaan Finishing


a. Pengecatan Dinding Interior m2 60 45,000.00 Rp 2,700,000.00
b. Pengecatan Dinding Exterior m2 60 55,000.00 Rp 3,300,000.00
c. Pengecatan Plafond m2 65.61 45,000.00 Rp 2,952,450.00

6.6 Pekerjaan Penutup Atap


a. Pemasangan Atap Genteng m2 66.45164 180,000.00 Rp 11,961,295.20
b. Mahkota Plat Steel 3mm bh 1 750,000.00 Rp 750,000.00
c. Pemasangan Bubung Metal Zincalumn m' 23.2 200,000.00 Rp 4,640,000.00
d. Lisplank m 31.56

7 Pekerjaan Listrik
Pas. Lampu LED T8 LED 16W bh 3 125,500.00 Rp 376,500.00
Pas. Lampu Down light + Fitting bh 12 156,000.00 Rp 1,872,000.00
Pek. Pas. Stop Kontak bh 2 25,000.00 Rp 50,000.00
Pek. Pas. Saklar Ganda, setara Philips bh 2 45,000.00 Rp 90,000.00

8 Pekerjaan Sanitasi dan Saniter


Talang Air m 32.4 22,000.00 Rp 712,800.00
Pas. Kran Dinding bh 3 175,000.00 Rp 525,000.00
Pas. Instalasi Air Bersih ls 1 10,500,000.00 Rp 10,500,000.00
Pas. Instalasi Air Kotor ls 1 8,579,300.00 Rp 8,579,300.00
SUBTOTAL Rp 148,717,074.63
H Pekerjaan Rumah Genset
m2 74.573 2,000,000.00 Rp 149,145,000.00
SUBTOTAL Rp 149,145,000.00
I Gapura
1 Pekejaan Tanah
Penggalian Tanah untuk Konstruksi m3 1.7825496
Pengurugan Tanah Kembali untuk Konstruksi m3 1.101848
Pekerjaan buangan sisa galian ke disposal m3 0.6807016

2 Pekerjaan Beton K-175 Insitu


Lean Concrete
Pekerjaan Beton K-175 m3

3 Pekerjaan Beton Bertulang K-250 Insitu


Pondasi
Pondasi Batu Kali m3 0.9087016

Pekerjaan Tie Beam / sloof beton


Pekerjaan pembesian tie beam kg 27.36
Pekerjaan Bekisting tie beam m2 4.18
Pekerjaan Pengecoran Beton K-225 m3 0.228

Pekerjaan Kolom Beton


Pekerjaan pembesian kolom kg
Pekerjaan Bekisting kolom m2
Pekerjaan Pengecoran Beton K-225 m3

4 Pekerjaan Pengecatan
Pek. Cat Beton Eksterior Pure White m2 70,000 Rp 3,192,000.00
Pek. Cat Beton Eksterior Kolom dan Ring Balok m2 70,000 Rp 14,257,425.00
Pek. Cat Akrilik Panel GRC m2 150,000 Rp 19,577,400.00
Pek. Cat Besi m2 160,000 Rp 133,784.14

5 Pekerjaan Atap & Aksesoris


Hollow finishing galvanis diameter 4" m' 2.88 Rp 2,088,256.00
Rangka Alumunium m2 Rp 137,929,260.00
Atap Asbes m2 63.9431
Plafond m2 75.18 5,000,000 Rp 9,765,000.00

6 Pekerjaan Elektrikal dan Panel Lampu Sorot Gapura ls 12,000,000 Rp -


SUBTOTAL Rp 255,104,092.44
J Lapangan Penumpukan Semenisasi
Pekerjaan Lapangan Penumpukan Semenisasi m2 9974.643 1,808,821.00 Rp 18,042,344,265.05
SUBTOTAL Rp 18,042,344,265.05
K Lapangan Penumpukan Terbuka
Pekerjaan Lapangan Penumpukan Lapangan Terbuka m2 2087.635 1,703,764.00 Rp 3,556,837,279.91
SUBTOTAL Rp 3,556,837,279.91
L Lapangan Parkir
1 Pekerjaan Perkerasan Jalan
a. Batu Pecah CBR > 80% m3 502.848
b. CTB K-100 m3 1340.929
c. Pasir yang dipadatkan 5cm m3 100.570
d. Paving Blok m2 3352.321
SUBTOTAL Rp -
M Gangway dan Pagar BRC
1 Pekerjaan Tanah
a. Penggalian Tanah untuk Konstruksi m3
b. Pengurugan Tanah Kembali untuk Konstruksi m3
c. Pekerjaan buangan sisa galian ke disposal m3

2 Pekerjaan Fondasi
a. Fondasi Batu Kali m3 201.60
b. Aantsamping m3 96.00
c. Urugan Pasir 5 cm m3 32.00

3 Pekerjaan Beton Bertulang


3.1 Pekerjaan Tie Beam / sloof beton
a. Pekerjaan pembesian tie beam kg
b. Pekerjaan Bekisting tie beam m2 480.00
c. Pekerjaan Pengecoran Beton K-225 m3 28.80

4 Pekerjaan Pemasangan Pagar BRC


a. Pemasangan Pagar BRC m' 640.00
b. Pipa Galvanis 2 inch m 473.60
SUBTOTAL
O Lansekap
Pemasangan Rumput m2 16890.18 50,000.00 Rp 10,193,558.25
Penanaman Pohon btg 50.00 600,000.00 Rp 30,000,000.00
SUBTOTAL Rp 40,193,558.25
P Marka dan Kanstein
Pengecatan Marka (Area Parkir ) m' 1391.00 87,500.00 Rp 47,708,500.00
Pengecatan Kanstin + Finis Cat m3 46.91 2,255,489.36 Rp 105,814,027.66
SUBTOTAL Rp 153,522,527.66
Q Pekerjaan Signage
Suspenden Sign SS180 bh 2.00 1,570,888.00 Rp 3,141,776.00
Suspenden Sign SS270 bh 1.00 1,570,888.00 Rp 1,570,888.00
Suspenden Sign SS320 bh 1.00 1,570,888.00 Rp 1,570,888.00
Suspenden Sign SS450 bh 1.00 1,570,888.00 Rp 1,570,888.00
Sign Titik Berkumpul bh 2.00 1,203,546.00 Rp 2,407,092.00
Flag Mounted FMA28 bh 1.00 570,888.00 Rp 570,888.00
Sign Taxi bh 2.00 1,203,546.00 Rp 2,407,092.00
Sign Parkir bh 2.00 1,203,546.00 Rp 2,407,092.00
Sign Arah Masuk bh 3.00 1,203,546.00 Rp 3,610,638.00
Sign Verboden bh 2.00 1,203,546.00 Rp 2,407,092.00
Papan Nama Terminal bh 1.00 18,600,000.00 Rp 18,600,000.00
Arah Nama Kolom bh 4.00 1,203,546.00 Rp 4,814,184.00
Pintu Darurat bh 1.00 1,570,888.00 Rp 1,570,888.00
SUBTOTAL Rp 46,649,406.00
V PEKERJAAN MEP
A. Pekerjaan Mechanical & Plumbing
A1 Pekerjaan Water Tank (Torn Cap 5000 Lt)
1 Pekerjaan Podasi m³ 5.04
2 Pekerjaan pengeboran Sumur Bor hari 7
3 pipa pvc 4" AW abu abu (casing Sumur bor) m' 60
4 Pompa Summersible 11/2 PK bh 1
5 tower Penyangga Torn kg 2184
6 Torn Cap 5000 liter bh 1
A2 PEKERJAAN SEPTIC TANK
1 Pekerjaan Pembuatan sumur Resapan bh 4
2 Pekerjaan Pembuatan septic Tank bh 4

A3 PEKERJAAN DRAINASE SALURAN


1 Pemasangan saluran Primer (1) U Ditch 500 x 500 x1200 m' 402.24
2 Pemasangan saluran Primer (2) U Ditch 400 x 400 x1200 m' 376.8
3 Pemasangan saluran sekunder (1) U Ditch 300 x 400 x1200 m' 469.92
4 Pemasangan saluran Box Culvert 300 x 400 x1200 m' 18.2

A4 PEKERJAAN AIR BERSIH DAN AIR KOTOR

1 Galian tanah unyuk pipa sedalam 1 meter m' 431.85


2 Mengurug kembali Galian Tanah yang dipadatkan m' 376.8
3 Pemasangan saluran distribusi Air Bersih Utama (11/4") m' 334.49
4 Pemasangan saluran Distribusi Air Bersih (1") m' 98.41
5 Pemasangan saluran Pembuangan Air Kotor 4" m' 93.21
6 Pemasangan saluran Pembuangan Air Kotor ke Septic Tank m' 116.22

B ELEKTRIKAL
B1 PEMASANGAN KABEL
1 Galian tanah unyuk pipa sedalam 1,5 meter m' 843.7
2 Mengurug kembali Galian Tanah yang dipadatkan m' 843.7
3 Pemasangan Kabel Listrik dari Trafo ke Elctrical Room(Genset Room) m' 316.03
4 Pemasangan Kabel Distribusi ke Panel Area Gedung m' 247
5 Pemasangan Kabel Distribusi dari Panel ke area Gedung m' 156
6 panel sdp untuk tiap area gedung bh 6

B2 PEMASANGAN KONSTUKSI PJU


1 Pekerjaan pondasi telapak untuk PJU m³ 17.424
2 Pemasangan PJU 1 (Flood Lamp & CCTV& Solar Cell) t=10m Unit 5
3 Pemasangan PJU 2 ( Led Lamp & Solar Cell) t=7m Unit 17

B3 APAR/APAB
1 Pekerjaan pondasi telapak untuk Rumah apar m³ 0.18
2 Lantai Beton m³ 0.294
3 Pemasangan Rumah Genset Out Door kg 305.6
4 APAR/APAB Portable Cap 50Kg bh 2
1 Pekerjaan Pembersihan ls 1.00 25,000,000.00 Rp 25,000,000.00
SUBTOTAL Rp 25,000,000.00
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERHUBUNGAN LAUT
KANTOR KESYAHBANDARAN DAN OTORITAS PELABUHAN KELAS II TANJUNG PINANG

RENCANA ANGGARAN BIAYA ( R A B )


#REF!
#REF!

VOLUME HARGA SATUAN JUMLAH HARGA


No. URAIAN PEKERJAAN SATUAN
Rp Rp
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi Peralatan Ls 1.00 720,609,693.75 Rp 720,609,693.75
2 Pengukuran dan Positioning Ls 1.00 113,720,625.00 Rp 113,720,625.00
3 PDA Test Ls 1.00 114,099,693.75 Rp 114,099,693.75
4 Direksi Keet dan Gudang Ls 1.00 189,837,630.00 Rp 189,837,630.00
5 Penerangan dan Keselamatan Kerja Ls 1.00 128,883,375.00 Rp 128,883,375.00
6 Pelaporan dan Dokumentasi Ls 1.00 280,510,875.00 Rp 280,510,875.00
SUBTOTAL I Rp 1,547,661,892.50
II PEKERJAAN PEMATANGAN LAHAN
1 Pekerjaan Pematangan Lahan
1.1 Pembersihan Lahan (Grubbing & Clearing) m2 35000 24,841.12 Rp 869,439,200.00
1.2 Pembersihan Lahan (Stripping, t=1 m) m2 35000 55,496.56 Rp 1,942,379,586.23
SUBTOTAL 2 Rp 2,811,818,786.23
III PERKERASAN JALAN DAN DRAINASE
1 Pekerjaan Jalan dan Drainase m2 7056.000 15,749.00 Rp 111,124,950.53
SUBTOTAL 3 Rp 111,124,950.53
IV FASILITAS BANGUNAN DARAT
A KANTOR PELABUHAN + KANTIN
1 Pekerjaan Tanah
a. Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 33.75 89,100.00 Rp 3,007,125.00
b. Pekerjaan urugan kembali (backfill) m3 16.575 44,000.00 Rp 729,300.00
c. Pekerjaan buangan sisa galian ke disposal m3 17.175 38,126.00 Rp 654,814.05
2 Pekerjaan Pondasi Tapak
a. Lantai Kerja m3 1.92 1,355,172.42 Rp 2,601,931.04
3 Pekerjaan Beton K-175
a. Lantai Kerja m3 12.626 1,355,172.42 Rp 17,110,666.11
4 Pekerjaan Beton Bertulang K-250 Insitu
4.1 Pondasi
a. Pekerjaan Beton K-250 m3 17.175 2,219,663.58 Rp 38,122,722.03
b. Pekerjaan Pembesian kg 901.878 15,749.00 Rp 14,203,677.46
c. Pekerjaan Bekisting m2 51.000 299,435.08 Rp 15,271,189.16
4.2 Sloof
a. Pekerjaan Beton K-250 m3 5.850 2,219,663.58 Rp 12,985,031.96
b. Pekerjaan Pembesian kg 915.161 15,749.00 14,203,677.46
c. Pekerjaan Bekisting m2 97.500 299,435.08 15,271,189.16
4.3 Kolom `
a. Pekerjaan Beton K-250 m3 2.609 2,219,663.58 Rp 5,790,880.32
b. Pekerjaan Pembesian kg 698.626 15,749.00 Rp 11,002,663.88
c. Pekerjaan Bekisting m2 59.632 299,435.08 Rp 17,855,912.78
4.4 Ring Balok
a. Pekerjaan Beton K-250 m3 4.950 2,219,663.58 Rp 10,987,334.73
b. Pekerjaan Pembesian kg 774.371 15,749.00 Rp 12,195,575.90
c. Pekerjaan Bekisting m2 82.500 299,435.08 Rp 24,703,394.22
4.5 Pelat Lantai
a. Pekerjaan Beton K-250 m3 30.303 2,219,663.58 Rp 67,262,152.58
b. Pekerjaan Pembesian kg 3787.857 15,749.00 Rp 59,654,969.31
c. Pekerjaan Bekisting m2 252.524 299,435.08 Rp 75,614,492.11
5 Pekerjaan Rangka Atap Baja Ringan
5.1 Pemasangan Rangka Baja ringan m2 284.76 350,000.00 Rp 99,666,000.00
6 Pekerjaan Arsitektur
6.1 Pekerjaan Dinding
a. Pekerjaan Dinding 1/2 Bata m2 294.722 257,191.72 Rp 75,800,059.55
b. Plesteran m2 589.444 52,701.00 Rp 31,064,288.24
c. Acian m2 589.444 48,328.50 Rp 28,486,944.35
6.2 Pekerjaan Lantai
a. Keramik Glossy 600x600mm m2 188.795 492,353.28 Rp 92,953,838.24
b. Keramik non slip 400x400mm m2 11.205 172,396.57 Rp 1,931,703.61
c. Lantai Plesteran K-125 m2 103.84 1,300,000.00 Rp 134,992,000.00
6.3 Pekerjaan Plafon
a. Plafon Gypsum 9 mm m2 293.8795 153,000.00 Rp 44,963,563.50
6.4 Pekerjaan Pintu dan Jendela
a. Pintu P1 (1800x2600 mm) Alumunium + Kaca unit 1 3,300,000.00 Rp 3,300,000.00
b. Pintu P2 (2200x2600mm) Alumunium + Kaca unit 1 3,500,000.00 Rp 3,500,000.00
c. Pintu P3 (900x2600mm) Alumunium + Kaca unit 8 2,500,000.00 Rp 20,000,000.00
d. Pintu P4 (700x2200mm) Alumunium unit 4 2,500,000.00 Rp 10,000,000.00
e. Jendela J1 (4740x2502mm) Alumunium + Kaca unit 1 3,500,000.00 Rp 3,500,000.00
f. Jendela J2 (1700x1600mm) Alumunium + Kaca unit 5 2,500,000.00 Rp 12,500,000.00
g. Jendela J3 (1700x1600mm) Alumunium + Kaca unit 2 2,500,000.00 Rp 5,000,000.00
h. Jendela J4 (950x600mm) Alumunium + Kaca unit 6 500,000.00 Rp 3,000,000.00
6.5 Pekerjaan Finishing
a. Pengecatan Dinding Interior m2 510.623 45,000.00 Rp 22,978,035.00
b. Pengecatan Dinding Exterior m2 195.339 55,000.00 Rp 10,743,645.00
c. Pengecatan Plafond m2 293.8795 45,000.00 Rp 13,224,577.50
6.6 Pekerjaan Penutup Atap
a. Pemasangan Atap Genteng m2 130.522 180,000.00 Rp 23,493,960.00
b. Pemasangan Bubung Metal Zincalumn m' 39.348 200,000.00 Rp 7,869,600.00
7 Pekerjaan Listrik
a. Pas. Lampu LED T8 LED 16W bh 30 125,500.00 Rp 3,765,000.00
b. Pas. Lampu Down light + Fitting bh 9 156,000.00 Rp 1,404,000.00
c. Pek. Pas. Stop Kontak bh 11 25,000.00 Rp 275,000.00
d. Pek. Pas. Saklar Tunggal, setara Philips bh 5 25,000.00 Rp 125,000.00
e. Pek. Pas. Saklar Ganda, setara Philips bh 4 45,000.00 Rp 180,000.00
f. Pas. Lampu Dinding Spotlight Outdoor bh 6 140,000.00 Rp 840,000.00
8 Pekerjaan Sanitasi dan Saniter
a. Pas. Closet Duduk + Accessories bh 4 5,316,800.00 Rp 21,267,200.00
b. Pas. Wastafel + Accessories bh 4 3,457,340.00 Rp 13,829,360.00
c. Pas. Kran Dinding bh 4 175,000.00 Rp 700,000.00
d. Pas. Instalasi Air Bersih ls 1 10,500,000.00 Rp 10,500,000.00
e. Pas. Instalasi Air Kotor ls 1 8,579,300.00 Rp 8,579,300.00
f. Pek. Septictank ls 1 17,558,000.00 Rp 17,558,000.00
SUBTOTAL 5 Rp 1,147,219,774.26
B KANTOR KSOP
1 Pekerjaan Tanah
a. Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 105 89,100.00 Rp 9,355,500.00
b. Pekerjaan urugan kembali (backfill) m3 50.356 44,000.00 Rp 2,215,675.00
c. Pekerjaan buangan sisa galian ke disposal m3 54.644 38,126.00 Rp 2,083,347.61
2 Pekerjaan Pondasi Tapak
a. Lantai Kerja m3 5.8675 1,355,172.42 Rp 7,951,474.16
3 Pekerjaan Beton K-175
a. Lantai Kerja m3 39.484375 1,355,172.42 Rp 53,508,135.89
4 Pekerjaan Beton Bertulang K-250 Insitu Rp -
4.1 Pondasi Rp -
a. Pekerjaan Beton K-250 m3 54.644 2,219,663.58 Rp 121,290,741.90
b. Pekerjaan Pembesian kg 3281.145 15,749.00 Rp 51,674,754.38
c. Pekerjaan Bekisting m2 144.500 299,435.08 Rp 43,268,369.27
4.2 Sloof
a. Pekerjaan Beton K-250 m3 43.660 2,219,663.58 Rp 96,910,512.02
b. Pekerjaan Pembesian kg 5209.266 15,749.00 Rp 82,040,738.67
c. Pekerjaan Bekisting m2 448.950 299,435.08 Rp 134,431,379.83
4.3 Kolom `
a. Pekerjaan Beton K-250 m3 23.232 2,219,663.58 Rp 51,567,779.27
b. Pekerjaan Pembesian kg 6895.562 15,749.00 Rp 108,598,213.55
c. Pekerjaan Bekisting m2 406.020 299,435.08 Rp 121,576,631.78
4.4 Balok
a. Pekerjaan Beton K-250 m3 44.020 2,219,663.58 Rp 97,709,590.91
b. Pekerjaan Pembesian kg 5311.161 15,749.00 Rp 83,645,481.85
c. Pekerjaan Bekisting m2 459.700 299,435.08 Rp 137,650,306.96
4.4 Ring Balok
a. Pekerjaan Beton K-250 m3 44.020 2,219,663.58 Rp 97,709,590.91
b. Pekerjaan Pembesian kg 5311.161 15,749.00 Rp 83,645,481.85
c. Pekerjaan Bekisting m2 459.700 299,435.08 Rp 137,650,306.96
4.5 Pelat Lantai
a. Pekerjaan Beton K-250 m3 180.659 2,219,663.58 Rp 401,003,035.57
b. Pekerjaan Pembesian kg 22582.422 15,749.00 Rp 355,650,583.02
c. Pekerjaan Bekisting m2 1389.688 299,435.08 Rp 416,121,189.80
5 Pekerjaan Rangka Atap Baja Ringan
5.1 Pemasangan Rangka Baja ringan m2 759 350,000.00 Rp 265,650,000.00
6 Pekerjaan Arsitektur
6.1 Pekerjaan Dinding
a. Pekerjaan Dinding 1/2 Bata m2 1701.8 257,191.72 Rp 437,688,877.48
b. Plesteran m2 3403.6 52,701.00 Rp 179,373,123.60
c. Acian m2 3403.6 48,328.50 Rp 164,490,882.60
d. Keramik Dinding 200x400mm m2 61.515 172,396.57 Rp 10,604,975.26
6.2 Pekerjaan Lantai Rp -
a. Keramik Glossy 600x600 mm m2 1175.15 492,353.28 Rp 578,588,961.63
b. Keramik non slip 400x400mm m2 24.85 172,396.57 Rp 4,284,054.87
6.3 Pekerjaan Plafon Rp -
a. Plafon Gypsum 9 mm m2 1359 153,000.00 Rp 207,927,000.00
6.4 Pekerjaan Pintu dan Jendela Rp -
a. Pintu P1 (2200x2980mm) Kayu Double Multi Lapis HPL + Kaca unit 8 3,500,000.00 Rp 28,000,000.00

b. unit 2,500,000.00 Rp 25,000,000.00


Pintu P2 (900x2250mm) Alumunium + Kayu Double Multi Lapis HPL 10
c. Pintu P3 (900x2250mm) Alumunium unit 12 2,500,000.00 Rp 30,000,000.00
d. PJ (2525x2200mm) Alumunium + Kayu Double + Kaca unit 6 3,300,000.00 Rp 19,800,000.00
e. Jendela J2 (1700x1600mm) Alumunium + Kaca unit 47 2,500,000.00 Rp 117,500,000.00
f. Jendela J3 (870x600mm) Alumunium +Kaca unit 6 1,250,000.00 Rp 7,500,000.00
g. Jendela JS1 (1000x3080mm) Alumunium + Kayu Double unit 6 2,300,000.00 Rp 13,800,000.00
h. Jendela JS2 (1660x4430mm) Alumunium + Kayu Double unit 2 2,500,000.00 Rp 5,000,000.00
6.5 Pekerjaan Finishing
a. Pengecatan Dinding Interior m2 2733.6 45,000.00 Rp 123,012,000.00
b. Pengecatan Dinding Exterior m2 670 55,000.00 Rp 36,850,000.00
c. Pengecatan Plafond m2 1359 45,000.00 Rp 61,155,000.00
6.6 Pekerjaan Penutup Atap
a. Pemasangan Atap Genteng m2 431.396 180,000.00 Rp 77,651,280.00
b. Pemasangan Bubung m' 48.656 200,000.00 Rp 9,731,200.00
7 Pekerjaan Listrik
a. Pas. Lampu LED T8 LED 16W bh 92 125,500.00 Rp 11,546,000.00
b. Pas. Lampu Down light + Fitting bh 36 156,000.00 Rp 5,616,000.00
c. Pek. Pas. Stop Kontak bh 50 25,000.00 Rp 1,250,000.00
d. Pek. Pas. Saklar Tunggal, setara Philips bh 14 25,000.00 Rp 350,000.00
e. Pek. Pas. Saklar Ganda, setara Philips bh 15 45,000.00 Rp 675,000.00
f. Pas. Lampu Dinding Spotlight Outdoor ttk 28 140,000.00 Rp 3,920,000.00
8 Pekerjaan Sanitasi dan Saniter
a. Pas. Closet Duduk + Accessories bh 10 5,316,800.00 Rp 53,168,000.00
b. Pas. Wastafel + Accessories bh 8 3,457,340.00 Rp 27,658,720.00
c. Urinor bh 6 3,368,000.00 Rp 20,208,000.00
d. Pas. Instalasi Air Bersih ls 1 10,500,000.00 Rp 10,500,000.00
e. Pas. Instalasi Air Kotor ls 1 8,579,300.00 Rp 8,579,300.00
f. Pek. Septictank ls 1 17,558,000.00 Rp 17,558,000.00
SUBTOTAL 6 Rp 5,261,895,196.61
C. Gudang Pelabuhan
1 Pekerjaan Tanah
a. Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 20 89,100.00 Rp 1,782,000.00
b. Pekerjaan urugan kembali (backfill) m3 11.250 44,000.00 Rp 495,000.00
c. Pekerjaan buangan sisa galian ke disposal m3 8.750 38,126.00 Rp 333,602.50
2 Pekerjaan Pondasi Tapak
a. Lantai Kerja m3 1.210 1,355,172.42 Rp 1,639,758.62
3 Pekerjaan Beton K-175
a. Lantai Kerja m3 37.4525 1,355,172.42 Rp 50,754,594.94
4 Pekerjaan Beton Bertulang K-250 Insitu
4.1 Pondasi
a. Pekerjaan Beton K-250 m3 8.750 2,219,663.58 Rp 19,422,056.35
b. Pekerjaan Pembesian kg 866.291 15,749.00 Rp 13,643,213.35
c. Pekerjaan Bekisting m2 2.840 299,435.08 Rp 850,395.63
4.2 Sloof
a. Pekerjaan Beton K-250 m3 10.688 2,219,663.58 Rp 23,722,654.54
b. Pekerjaan Pembesian kg 1147.621 15,749.00 Rp 18,073,883.04
c. Pekerjaan Bekisting m2 109.250 299,435.08 Rp 32,713,282.65
4.3 Kolom
a. Pekerjaan Beton K-250 m3 2,219,663.58 Rp -
b. Pekerjaan Pembesian kg 15,749.00 Rp -
c. Pekerjaan Bekisting m2 299,435.08 Rp -
4.4 Ring Balok
a. Pekerjaan Beton K-250 m3 10.688 2,219,663.58 Rp 23,722,654.54
b. Pekerjaan Pembesian kg 1147.621 15,749.00 Rp 18,073,883.04
c. Pekerjaan Bekisting m2 109.250 299,435.08 Rp 32,713,282.65
4.5 Pelat Lantai
a. Pekerjaan Beton K-250 m3 74.905 2,219,663.58 Rp 166,263,900.66
b. Pekerjaan Pembesian kg 9363.125 15,749.00 Rp 147,459,864.29
c. Pekerjaan Bekisting m2 749.050 299,435.08 Rp 224,291,847.78
5 Pekerjaan Rangka Atap
5.1 Purlin P1 CNP.100x50x20x2.3 kg 674.4 Rp -
5.2 Rafter R1 IWF.200.100.5,5.8S kg 151.92 Rp -
5.3 Sagrod SG Dimeter 19 kg 141.776 Rp -
5.4 Trekstang Diameter 10 436.8 Rp -
6 Pekerjaan Arsitektur
6.1 Pekerjaan Dinding
a. Pekerjaan Dinding 1/2 Bata m2 660 257,191.72 Rp 169,746,538.45
b. Plesteran m2 1320 52,701.00 Rp 69,565,320.00
c. Acian m2 1320 48,328.50 Rp 63,793,620.00
6.2 Pekerjaan Lantai
a. Plesteran K-125 m2 749.05 1,300,000.00 Rp 973,765,000.00
6.3 Pekerjaan Plafon
a. Plafon Gypsum 9 mm m2 749.05 153,000.00 Rp 114,604,650.00
6.4 Pekerjaan Pintu dan Jendela
a. Pintu P1 (4000x4000) Plat Besi unit 2 18,400,000.00 Rp 36,800,000.00
b. Jendela J1 (2200x820mm) unit 12 2,500,000.00 Rp 30,000,000.00
c. Jendela J2 (2000x745mm) Alumunium unit 4 2,300,000.00 Rp 9,200,000.00
6.5 Pekerjaan Finishing
a. Pengecatan Dinding Interior m2 660 45,000.00 Rp 29,700,000.00
b. Pengecatan Dinding Exterior m2 660 55,000.00 Rp 36,300,000.00
c. Pengecatan Plafond m2 749.05 45,000.00 Rp 33,707,250.00
6.6 Pekerjaan Penutup Atap
a. Pemasangan Atap m2 362.92 180,000.00 Rp 65,325,600.00
b. Pemasangan Bubung m' 42.2 200,000.00 Rp 8,440,000.00
7 Pekerjaan Listrik
a. Pas. Lampu LED T8 LED 16W bh 24 125,500.00 Rp 3,012,000.00
b, Pek. Pas. Stop Kontak bh 6 25,000.00 Rp 150,000.00
c. Pek. Pas. Saklar Tunggal bh 3 25,000.00 Rp 75,000.00
e. Pas. Lampu Spotlight ttk 6 140,000.00 Rp 840,000.00
SUBTOTAL 6 Rp 2,420,980,853.04
D Kantor Imigrasi, Karantina, K3, Bea Cukai
1 Pekerjaan Tanah
a. Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 30.72 89,100.00 Rp 2,737,152.00
b. Pekerjaan urugan kembali (backfill) m3 15.300 44,000.00 Rp 673,200.00
c. Pekerjaan buangan sisa galian ke disposal m3 15.420 38,126.00 Rp 587,902.92
2 Pekerjaan Pondasi Tapak
a. Lantai Kerja m3 1.536 1,355,172.42 Rp 2,081,544.83
3 Pekerjaan Beton K-175
a. Lantai Kerja m3 5.34375 1,355,172.42 Rp 7,241,702.60
4 Pekerjaan Beton Bertulang K-250 Insitu
4.1 Pondasi
a. Pekerjaan Beton K-250 m3 13.884 2,219,663.58 Rp 30,817,809.18
b. Pekerjaan Pembesian kg 790.447 15,749.00 Rp 12,448,753.68
c. Pekerjaan Bekisting m2 43.680 299,435.08 Rp 13,079,324.36
4.2 Sloof
a. Pekerjaan Beton K-250 m3 2.610 2,219,663.58 Rp 5,793,321.95
b. Pekerjaan Pembesian kg 852.367 15,749.00 Rp 13,423,925.39
c. Pekerjaan Bekisting m2 43.500 299,435.08 Rp 13,025,426.04
4.3 Kolom
a. Pekerjaan Beton K-250 m3 1.710 2,219,663.58 Rp 3,795,624.73
b. Pekerjaan Pembesian kg 151.348 15,749.00 Rp 2,383,581.34
c. Pekerjaan Bekisting m2 36.000 299,435.08 Rp 10,779,662.93
4.4 Ring Balok
a. Pekerjaan Beton K-250 m3 2.610 2,219,663.58 Rp 5,793,321.95
b. Pekerjaan Pembesian kg 852.367 15,749.00 Rp 13,423,925.39
c. Pekerjaan Bekisting m2 43.500 299,435.08 Rp 13,025,426.04
4.5 Pelat Lantai
a. Pekerjaan Beton K-250 m3 16.031 2,219,663.58 Rp 35,583,981.81
b. Pekerjaan Pembesian kg 2003.906 15,749.00 Rp 31,559,521.39
c. Pekerjaan Bekisting m2 106.875 299,435.08 Rp 32,002,124.33
5 Pekerjaan Rangka Atap Baja Ringan
5.1 Pemasangan Rangka Baja ringan IWF 150x75x5x7 m2 79.326 350,000.00 Rp 27,764,100.00
6 Pekerjaan Arsitektur
6.1 Pekerjaan Dinding
a. Pekerjaan Dinding 1/2 Bata m2 159 257,191.72 Rp 40,893,484.26
b. Plesteran m2 318 52,701.00 Rp 16,758,918.00
c. Acian m2 318 48,328.50 Rp 15,368,463.00
d. Keramik Dinding m2 42.39 172,396.57 Rp 7,307,890.78
e. Kaca 560 x 840 m2 4.704 100,000.00 Rp 470,400.00
6.2 Pekerjaan Lantai
a. Keramik Glossy 600x600mm m2 60 492,353.28 Rp 29,541,197.04
b. Keramik non slip 400x400mm m2 15 172,396.57 Rp 2,585,948.61
6.3 Pekerjaan Plafon
a. Plafon Gypsum 9 mm m2 14.75322 153,000.00 Rp 2,257,242.66
6.4 Pekerjaan Pintu dan Jendela
a. Pintu P1 (900x2600mm) Alumunium + Kaca unit 5 2,500,000.00 Rp 12,500,000.00
b. Pintu P2 (700x2200mm) Alumunium unit 2 2,500,000.00 Rp 5,000,000.00
c,, Jendela J1 (1700x2000mm) Alumunium + Kaca unit 4 2,500,000.00 Rp 10,000,000.00
d. Jendela J2 (870x600mm) Alumunium +Kaca unit 6 1,250,000.00 Rp 7,500,000.00
6.5 Pekerjaan Finishing
a. Pengecatan Dinding Interior m2 228 45,000.00 Rp 10,260,000.00
b. Pengecatan Dinding Exterior m2 120 55,000.00 Rp 6,600,000.00
c. Pengecatan Plafond m2 14.75322 45,000.00 Rp 663,894.90
6.6 Pekerjaan Penutup Atap
a. Pemasangan Atap Genteng m2 79.326 180,000.00 Rp 14,278,680.00
b. Pemasangan Bubung Metal Zincalumn m' 26.048 200,000.00 Rp 5,209,600.00
7 Pekerjaan Listrik
a. Pas. Lampu LED T8 LED 16W bh 12 125,500.00 Rp 1,506,000.00
b. Pas. Lampu Down light + Fitting bh 6 156,000.00 Rp 936,000.00
c. Pek. Pas. Stop Kontak bh 8 25,000.00 Rp 200,000.00
d. Pek. Pas. Saklar Tunggal bh 5 25,000.00 Rp 125,000.00
e. Pek. Pas. Saklar Ganda, setara Philips bh 1 45,000.00 Rp 45,000.00
f. Pas. Lampu Spotlight ttk 5 140,000.00 Rp 700,000.00
8 Pekerjaan Sanitasi dan Saniter
a. Pas. Closet Duduk + Accessories bh 2 5,316,800.00 Rp 10,633,600.00
b. Pas. Wastafel + Accessories bh 1 3,457,340.00 Rp 3,457,340.00
c. Urinoir bh 3 3,368,000.00 Rp 10,104,000.00
e. Pas. Instalasi Air Bersih ls 1 10,500,000.00 Rp 10,500,000.00
f. Pas. Instalasi Air Kotor ls 1 8,579,300.00 Rp 8,579,300.00
g. Septictank ls 1 17,558,000.00 Rp 17,558,000.00
SUBTOTAL Rp 529,561,292.13
E Pos Jaga
1 Pekerjaan Tanah
a. Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 11.2 89,100.00 Rp 997,920.00
b. Pekerjaan urugan kembali (backfill) m3 4.340 44,000.00 Rp 190,960.00
c. Pekerjaan buangan sisa galian ke disposal m3 6.860 38,126.00 Rp 261,544.36
2 Pekerjaan Pondasi Batu Kali
a. Pondasi Batu Kali m3 4.2 1,059,459.50 Rp 4,449,729.88
b. Pasir Urug m3 0.700 44,000.00 Rp 30,800.00
3 Pekerjaan Beton K-175
a. Lantai Kerja m3 0.7 1,355,172.42 Rp 948,620.69
4 Pekerjaan Beton Bertulang K-250 Insitu
4.1 Sloof
a. Pekerjaan Beton K-250 m3 1.260 2,219,663.58 Rp 2,796,776.11
b. Pekerjaan Pembesian kg 390.035 15,749.00 Rp 6,142,666.66
c. Pekerjaan Bekisting m2 21.000 299,435.08 Rp 6,288,136.71
4.2 Kolom
a. Pekerjaan Beton K-250 m3 0.792 2,219,663.58 Rp 1,757,973.56
b. Pekerjaan Pembesian kg 167.741 15,749.00 Rp 2,641,747.57
c. Pekerjaan Bekisting m2 15.840 299,435.08 Rp 4,743,051.69
4.3 Ring Balok
a. Pekerjaan Beton K-250 m3 1.125 2,219,663.58 Rp 2,497,121.53
b. Pekerjaan Pembesian kg 348.246 15,749.00 Rp 5,484,523.80
c. Pekerjaan Bekisting m2 18.750 299,435.08 Rp 5,614,407.78
4.4 Pelat Lantai
a. Pekerjaan Beton K-250 m3 3.750 2,219,663.58 Rp 8,323,738.44
b. Pekerjaan Pembesian kg 468.750 15,749.00 Rp 7,382,344.18
c. Pekerjaan Bekisting m2 25.000 299,435.08 Rp 7,485,877.04
5 Pekerjaan Rangka Atap Baja Ringan
5.1 Pemasangan Rangka Baja ringan m2 137.251036 350,000.00 Rp 48,037,862.60
6 Pekerjaan Arsitektur
6.1 Pekerjaan Dinding
a. Pekerjaan Dinding 1/2 Bata m2 84 257,191.72 Rp 21,604,104.89
b. Plesteran m2 168 52,701.00 Rp 8,853,768.00
c. Acian m2 168 48,328.50 Rp 8,119,188.00
6.2 Pekerjaan Lantai
a. Keramik Non Glossy 600x600mm m2 21.4 492,353.28 Rp 10,536,360.28
b. Keramik non slip 400x400mm m2 3.6 172,396.57 Rp 620,627.67
6.3 Pekerjaan Plafon
a. Plafon Gypsum 9 mm m2 65.61 153,000.00 Rp 10,038,330.00
6.4 Pekerjaan Pintu dan Jendela
a. Pintu P1 (900x2600mm) Alumunium + Kaca unit 2 2,500,000.00 Rp 5,000,000.00
b. Jendela J2 (1700x2000mm) Alumunium + Kaca unit 1 2,500,000.00 Rp 2,500,000.00
c. Jendela J3 (870x600mm) Alumunium +Kaca unit 1 1,250,000.00 Rp 1,250,000.00
6.5 Pekerjaan Finishing m2
a. Pengecatan Dinding Interior m2 108 45,000.00 Rp 4,860,000.00
b. Pengecatan Dinding Exterior m2 60 55,000.00 Rp 3,300,000.00
c. Pengecatan Plafond m2 65.61 45,000.00 Rp 2,952,450.00
d. Ukiran Kayu m2 3.84 187,500.00 Rp 720,000.00
6.6 Pekerjaan Penutup Atap
a. Pemasangan Atap Genteng m2 137.251036 180,000.00 Rp 24,705,186.48
b. Pemasangan Bubung Metal Zincalumn m' 17.804 200,000.00 Rp 3,560,800.00
7 Pekerjaan Listrik
a. Pas. Lampu LED T8 LED 16W bh 2 125,500.00 Rp 251,000.00
b. Pas. Lampu Down light + Fitting bh 5 156,000.00 Rp 780,000.00
c. Pek. Pas. Stop Kontak bh 2 25,000.00 Rp 50,000.00
d. Pek. Pas. Saklar Tunggal bh 1 25,000.00 Rp 25,000.00
e. Pek. Pas. Saklar Ganda, setara Philips bh 2 45,000.00 Rp 90,000.00
f. Pas. Lampu Spotlight ttk 4 140,000.00 Rp 560,000.00
8 Pekerjaan Sanitasi dan Saniter
a. Pas. Closet Duduk + Accessories bh 1 5,316,800.00 Rp 5,316,800.00
c. Pas. Kran Dinding bh 1 175,000.00 Rp 175,000.00
d. Talang Air m' 32.4 22,000.00 Rp 712,800.00
d. Pas. Instalasi Air Bersih ls 1 10,500,000.00 Rp 10,500,000.00
e. Pas. Instalasi Air Kotor ls 1 8,579,300.00 Rp 8,579,300.00
SUBTOTAL Rp 251,736,517.93
F Mushola
1 Pekerjaan Tanah
a. Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 8 89,100.00 Rp 712,800.00
b. Pekerjaan urugan kembali (backfill) m3 2.125 44,000.00 Rp 93,500.00
c. Pekerjaan buangan sisa galian ke disposal m3 5.875 38,126.00 Rp 223,990.25
2 Pekerjaan Pondasi Batu Kali
a. Pondasi Batu kali m3 3 1,059,459.50 Rp 3,178,378.49
b. Pasir Urug m3 0.500 44,000.00 Rp 22,000.00
3 Pekerjaan Beton K-175
a. Lantai Kerja m3 1.25 1,355,172.42 Rp 1,693,965.52
4 Pekerjaan Beton Bertulang K-250 Insitu
4.1 Sloof
a. Pekerjaan Beton K-250 m3 1.125 2,219,663.58 Rp 2,497,121.53
b. Pekerjaan Pembesian kg 348.246 15,749.00 Rp 5,484,523.80
c. Pekerjaan Bekisting m2 18.750 299,435.08 Rp 5,614,407.78
4.2 Kolom
a. Pekerjaan Beton K-250 m3 0.528 2,219,663.58 Rp 1,171,982.37
b. Pekerjaan Pembesian kg 111.827 15,749.00 Rp 1,761,165.05
c. Pekerjaan Bekisting m2 10.560 299,435.08 Rp 3,162,034.46
4.3 Ring Balok
a. Pekerjaan Beton K-250 m3 1.125 2,219,663.58 Rp 2,497,121.53
b. Pekerjaan Pembesian kg 348.246 15,749.00 Rp 5,484,523.80
c. Pekerjaan Bekisting m2 18.750 299,435.08 Rp 5,614,407.78
4.4 Pelat Lantai
a. Pekerjaan Beton K-250 m3 4.256 2,219,663.58 Rp 9,447,443.12
b. Pekerjaan Pembesian kg 532.031 15,749.00 Rp 8,378,960.65
c. Pekerjaan Bekisting m2 25.000 299,435.08 Rp 7,485,877.04
5 Pekerjaan Rangka Atap Baja Ringan
5.1 Pemasangan Rangka Baja ringan IWF 150x75x5x7 m2 137.251036 350,000.00 Rp 48,037,862.60
6 Pekerjaan Arsitektur
6.1 Pekerjaan Dinding
a. Pekerjaan Dinding 1/2 Bata m2 62.575 257,191.72 Rp 16,093,772.19
b. Plesteran m2 125.15 52,701.00 Rp 6,595,530.15
c. Acian m2 125.15 48,328.50 Rp 6,048,311.78
d. Keramik Dinding m2 5.15 172,396.57 Rp 887,842.36
6.2 Pekerjaan Lantai
a. Keramik Glossy 600x600mm m2 26.58625 492,353.28 Rp 13,089,827.50
b. Keramik Non Slip 400x400mm m2 1.789 172,396.57 Rp 308,374.37
6.3 Pekerjaan Plafon
a. Plafon Gypsum 9 mm m2 65.61 153,000.00 Rp 10,038,330.00
6.4 Pekerjaan Pintu dan Jendela
a. Jendela J7 (1438X1819mm) Kayu Double Multi Lapis HPL + Kaca unit 4 3,500,000.00 Rp 14,000,000.00
b. Pintu (2763x1325)mm unit 1 3,750,000.00 Rp 3,750,000.00
6.5 Pekerjaan Finishing
a. Pengecatan Dinding Interior m2 60 45,000.00 Rp 2,700,000.00
b. Pengecatan Dinding Exterior m2 60 55,000.00 Rp 3,300,000.00
c. Pengecatan Plafond m2 65.61 45,000.00 Rp 2,952,450.00
6.6 Pekerjaan Penutup Atap
a. Pemasangan Atap Genteng m2 137.251036 180,000.00 Rp 24,705,186.48
b. Mahkota Plat Steel 3mm bh 1 750,000.00 Rp 750,000.00
c. Pemasangan Bubung Metal Zincalumn m' 17.804 200,000.00 Rp 3,560,800.00
7 Pekerjaan Listrik
a. Pas. Lampu LED T8 LED 16W bh 3 125,500.00 Rp 376,500.00
b. Pas. Lampu Down light + Fitting bh 12 156,000.00 Rp 1,872,000.00
c. Pek. Pas. Stop Kontak bh 2 25,000.00 Rp 50,000.00
d. Pek. Pas. Saklar Ganda, setara Philips bh 2 45,000.00 Rp 90,000.00
8 Pekerjaan Sanitasi dan Saniter
a. Talang Air m 32.4 22,000.00 Rp 712,800.00
b. Pas. Kran Dinding bh 3 175,000.00 Rp 525,000.00
c. Pas. Instalasi Air Bersih ls 1 10,500,000.00 Rp 10,500,000.00
d. Pas. Instalasi Air Kotor ls 1 8,579,300.00 Rp 8,579,300.00
SUBTOTAL Rp 244,048,090.59
G Tangki Air
1 Pekerjaan Tanah
a. Pekerjaan galian sementara (untuk pondasi, sloof, dll) m3 9.8832 89,100.00 Rp 880,593.12
b. Pengurugan Tanah Kembali Untuk Konstruksi m3 6.274 44,000.00 Rp 276,056.00
c. Pekerjaan buangan sisa galian ke disposal m3 3.609 38,126.00 Rp 137,604.36
2 Pekerjaan Beton K-175
a. Lantai Kerja m3 0.6572 1,355,172.42 Rp 890,619.31
3 Pekerjaan Beton Bertulang K-250 Insitu
3.1 Pondasi
a. Pekerjaan Beton K-250 m3 2.952 2,219,663.58 Rp 6,552,446.90
b. Pekerjaan Pembesian kg 342.636 15,749.00 Rp 5,396,174.68
c. Pekerjaan Bekisting m2 10.560 299,435.08 Rp 3,162,034.46
3.2 Sloof
a. Pekerjaan Beton K-250 m3 1.171 2,219,663.58 Rp 2,599,669.99
b. Pekerjaan Pembesian kg 136.604 15,749.00 Rp 2,151,376.52
c. Pekerjaan Bekisting m2 15.616 299,435.08 Rp 4,675,978.23
4 Pekerjaan Baja
4.1 Pipa Besi Ø2 " kg 236.773 20,764.14 Rp 4,916,385.09
4.2 Pipa Besi Ø1 " kg 60.264 20,764.14 Rp 1,251,329.99
4.3 L.50.50.6 kg 1007.736 20,764.14 Rp 20,924,777.33
4.4 2L.50.50.6 kg 31.453 20,764.14 Rp 653,094.42
4.5 2L.90.90.7 kg 612.801 20,764.14 Rp 12,724,284.32
4.6 L.40.40.4 kg 108.832 20,764.14 Rp 2,259,807.61
4.7 Bracing L.40.40.4 kg 69.967 20,764.14 Rp 1,452,805.25
4.8 Bracing L.65.65.6 kg 190.775 20,764.14 Rp 3,961,274.21
4.9 Bracing L.50.50.6 kg 242.977 20,764.14 Rp 5,045,200.40
4.1 Bracing 2L.50.50.6 kg 205.977 20,764.14 Rp 4,276,940.60
4.11 Expended Mesh m2 13.148 1,906,546.97 Rp 25,066,326.31
SUBTOTAL Rp 109,254,779.11
H Pekerjaan Rumah Genset
Pekerjaan Rumah Genset m2 74.573 2,000,000.00 Rp 149,145,000.00
SUBTOTAL Rp 149,145,000.00
I Gapura
1 Pekejaan Tanah
Penggalian Tanah untuk Konstruksi
Pengurugan Tanah Kembali untuk Konstruksi
Pekerjaan buangan sisa galian ke disposal
Pekerjaan Beton K-175 Insitu
Lean Concrete
Pekerjaan Beton K-175
Pekerjaan Beton Bertulang K-250 Insitu
Pondasi
Pekerjaan Beton K-250
Pekerjaan Pembesian
Pekerjaan Bekisting
Sloof
Pekerjaan Beton K-250
Pekerjaan Pembesian
Pekerjaan Bekisting
Kolom & Pedestal
Pekerjaan Beton K-250
Pekerjaan Pembesian
Pekerjaan Bekisting
Balok
Pekerjaan Beton K-250
Pekerjaan Pembesian
Pekerjaan Bekisting
Pekerjaan Pengecatan
Pek. Cat Beton Eksterior Pure White
Pek. Cat Beton Eksterior Kolom dan Ring Balok
Pek. Cat Akrilik Panel GRC
Pek. Cat Besi
Pekerjaan Atap & Aksesoris
- Panel Fiber Semen (GRC) t=8 cm + Angkur dan Viser
- Roundbar GRC Panel Support Ø16
- Panel Nama Pelabuhan ACP + Angkur dan Rangka
Pekerjaan Elektrikal dan Panel Lampu Sorot Gapura

J Lapangan Penumpukan Semenisasi


Pekerjaan Lapangan Penumpukan Semenisasi m2 9974.643 1,808,821.00 Rp 18,042,344,265.05
SUBTOTAL Rp 18,042,344,265.05
L Lapangan Penumpukan Terbuka
M Lapangan Parkir
N Gangway dan Pagar BRC
O Lampu PJU dan Taman
P Lansekap
O Marka dan Kanstein
R Pekerjaan Signage
S PEKERJAAN LAIN LAIN
1 Pekerjaan Pembersihan ls 1.00 25,000,000.00 Rp 25,000,000.00
SUBTOTAL 20 Rp 25,000,000.00
URAIAN ANALISIS HARGA SATUAN PEKERJAAN (HSP)

PEKERJAAN : RAB DED Sisi Darat Pelabuhan Tanjung Moco

LOKASI : DERMAGA MOCO, TANJUNG PINANG

HARGA SAT. DASAR


NO URAIAN SAT KUANTI TAS SUB TOTAL (Rp) HSP (Rp)
(Rp)
1 2 3 4 5 6 7

PEKERJAAN PERSIAPAN
Pemagaran sementara dari seng gelombang t=2m

Harga bahan:
- Kayu Kayu Dolken Btg 1.25 57,500 71,875.00

- Semen kg 2.5 1,600 4,000.00

- Seng Bjls 0,2 lbr 1.2 63,800 76,560.00


- Pasir Beton m3 0.005 263,000 1,315.00

- Coral Beton m3 0.009 268,900 2,420.10


- Kayu 5/7 (bentangan yg 4 M) m3 0.072 2,500,000 180,000.00

- Paku Biasa 5-10cm kg 0.06 15,000 900.00


1. - Cat Meni kg 0.45 26,000 11,700.00

Jumlah Harga Bahan 348,770.10

Harga Upah:
Tukang Kayu OH 0.2 150,000 30,000.00

Pekerja OH 0.4 100,000 40,000.00


Kepala Tukang OH 0.02 180,000 3,600.00

Mandor OH 0.02 200,000 4,000.00


Jumlah Upah Tenaga 77,600.00

Jumlah Harga Bahan dan upah 426,370.10

Biaya Umum & Keuntungan 10% 42,637.01


Dibulatkan 469,000

Membuat kantor sementara, dengan lantai plesteran tiap 1 m² (AHSP Cipta Karya-2013 Persiapan A. 2.2.1.5)

Harga bahan:

- Kayu Dolken / mangi-mangi Ø 5-7 cm btg 1.250 57,500.00 71,875.00

- Kayu kelas III 5 x 5 x 400 (kayu lombo) m³ 0.180 4,000,000.00 720,000.00

- Paku biasa 2"-5" kg 0.850 15,000.00 12,750.00

- Besi pelat strip kg 1.100 42,900.00 47,190.00

- Semen portland kg 35.000 1,600.00 56,000.00

- Pasir Pasang m³ 0.150 198,000.00 29,700.00

- Pasir beton m³ 0.100 263,000.00 26,300.00

- Batu pecah/split 2/3 m³ 0.150 268,900.00 40,335.00

- Bata merah bh 30.000 2,500.00 75,000.00

- Seng gelombang 3x6 ft BJLS 20 (0,2 mm) lbr 0.250 47,300.00 11,825.00

- Jendela nako (rangka) daun 0.200 147,000.00 29,400.00


2.
- Kaca 3 mm m² 0.080 173,000.00 13,840.00

- Kunci tanam sederhana bh 0.150 58,000.00 8,700.00

- Teakwood 4x8 ft 3 mm lbr 0.060 135,000.00 8,100.00


Jumlah Harga Bahan 1,151,015.00

Upah tenaga:

- Tukang kayu OH 2.000 150,000.00 300,000.00

- Pekerja OH 1.000 100,000.00 100,000.00

- Kepala tukang OH 0.300 180,000.00 54,000.00

- Mandor OH 0.050 200,000.00 10,000.00

Jumlah Upah Tenaga 464,000.00


Jumlah Bahan & Tenaga 1,615,015.00

Biaya Umum & Keuntungan 10% 161,501.50

Dibulatkan 1,776,500

Pengukuran dan Pemasangan Bouwplank m' (sni HSP Permen PUPR 28-2016)

Upah tenaga:
- Tukang kayu OH 0.100 150,000.00 15,000.00

- Pekerja OH 0.100 100,000.00 10,000.00

- Kepala tukang OH 0.010 180,000.00 1,800.00

- Mandor OH 0.005 200,000.00 1,000.00

Jumlah Upah Tenaga 27,800.00


3.

HARGA SATUAN PEKERJAAN (HSP) -79


HARGA SAT. DASAR
NO URAIAN SAT KUANTI TAS SUB TOTAL (Rp) HSP (Rp)
(Rp)
1 2 3 4 5 6 7

3. Harga bahan:

- Kayu 5/7 Klas 2 m³ 0.012 2,700,000.00 32,400.00

- Paku biasa 2"-5" kg 0.020 15,000.00 300.00

- Papan Kayu klas 2 m³ 0.007 2,500,000.00 17,500.00

Jumlah Upah Tenaga 50,200.00

Jumlah Bahan & Tenaga 78,000.00


Biaya Umum & Keuntungan 10% 7,800.00

Dibulatkan 85,800

Menggali tanah biasa sedalam 1 meter tiap 1 m³ (AHSP Cipta Karya-2013 A. 2.3.1.1)

Upah tenaga:
- Pekerja OH 0.75 100,000 75,000.00

4. - Mandor OH 0.025 200,000 5,000.00


Jumlah Upah Tenaga 80,000.00

Biaya Umum & Keuntungan 10% 8,000.00


Dibulatkan 88,000

Pengurugan Kembali 1 m3 Galian Dihitung dari 1/3 kali (AHSP A.2.3.1.9)

Mengurug kembali 1 m³ galian dihitung dari 1/3 kali dari indeks pekerjaan galian
Upah tenaga:

- Pekerja OH 0.50 100,000 50,000.00


5.
- Mandor OH 0.05 200,000 10,000.00

Jumlah Upah Tenaga 60,000.00


Biaya Umum & Keuntungan 10% 6,000.00

Dibulatkan 66,000

(K3) Pembuangan Tanah Sejauh 30 meter AHSP A.2.3.1.8


Upah tenaga:

- Pekerja OH 0.33 100,000 33,000.00


6. - Mandor OH 0.01 200,000 2,000.00

Jumlah Upah Tenaga 35,000.00


Biaya Umum & Keuntungan 10% 3,500.00

Dibulatkan 38,500

Memasang Pipa 1,1/4" PVC AW


Harga bahan:

- Pipa 11/4 " AW Abu abu m' 1.200 36,034 43,241.38

- Perlengkapan OH 1.200 12,612 15,134.48

Jumlah Harga Bahan 58,375.86


Upah tenaga:

- Pekerja OH 0.036 100,000 3,600.00


7
- Tukang Pipa OH 0.060 150,000 9,000.00

- Kepala Tukang OH 0.006 180,000 1,080.00

- Mandor OH 0.002 200,000 360.00


Jumlah Upah Tenaga 13,680.00

Harga Upah dan Bahan 72,055.86


Biaya Umum & Keuntungan 10% 7,205.59

Dibulatkan 92,941

Memasang Pipa 1" PVC AW


Harga bahan:
- Pipa 1 " AW Abu abu m' 1.200 11,000 13,200.00

- Perlengkapan OH 1.200 3,850 4,620.00


Jumlah Harga Bahan 17,820.00

Upah tenaga:

- Pekerja OH 0.036 100,000 3,600.00


8
- Tukang Pipa OH 0.060 150,000 9,000.00

- Kepala Tukang OH 0.006 180,000 1,080.00


- Mandor OH 0.002 200,000 360.00

Jumlah Upah Tenaga 14,040.00


Harga Upah dan Bahan 31,860.00

Biaya Umum & Keuntungan 10% 3,186.00


Dibulatkan 49,086

HARGA SATUAN PEKERJAAN (HSP) -80


HARGA SAT. DASAR
NO URAIAN SAT KUANTI TAS SUB TOTAL (Rp) HSP (Rp)
(Rp)
1 2 3 4 5 6 7

Memasang Pipa Air Kotor 4" PVC AW


Harga bahan:
- Pipa 4 " AW Abu abu m' 1.200 83,793 100,551.72

- Perlengkapan OH 1.200 29,328 35,193.10

Jumlah Harga Bahan 135,744.83


Upah tenaga:

9 - Pekerja OH 0.036 100,000 3,600.00


- Tukang Pipa OH 0.060 150,000 9,000.00

- Kepala Tukang OH 0.006 180,000 1,080.00

- Mandor OH 0.002 200,000 360.00


Jumlah Upah Tenaga 14,040.00

Harga Upah dan Bahan 149,784.83


Biaya Umum & Keuntungan 10% 14,978.48

Dibulatkan 178,803

Pemasangan Listrik Kabel NYY 4x25mm


Harga bahan:
- Kabel NYY 4x25mm m' 1.000 254,531 254,531.00

- Acsesories ls 1.000 25,453 25,453.10


Jumlah Harga Bahan 279,984.10

Upah tenaga:
10 - Pekerja OH 0.100 100,000 10,000.00

- Tukang Listrik OH 0.100 150,000 15,000.00

- peralatan OH 1.000 0.00


Jumlah Upah Tenaga 25,000.00

Harga Upah dan Bahan 304,984.10


Biaya Umum & Keuntungan 10% 30,498.41

Dibulatkan 360,482

Pemasangan Listrik Kabel NYY 4x16mm


Harga bahan:

- Kabel NYY 4x25mm m' 1.000 137,438 137,438.00

- Acsesories ls 1.000 13,744 13,743.80

Jumlah Harga Bahan 151,181.80

Upah tenaga:
11 - Pekerja OH 0.100 100,000 10,000.00

- Tukang Listrik OH 0.100 150,000 15,000.00


- peralatan OH 1.000 0.00

Jumlah Upah Tenaga 25,000.00

Harga Upah dan Bahan 176,181.80


Biaya Umum & Keuntungan 10% 17,618.18

Dibulatkan 218,799

Pemasangan Listrik Kabel NYY 4x10mm


Harga bahan:

- Kabel NYY 4x25mm m' 1.000 112,902 112,902.00

- Acsesories ls 1.000 11,290 11,290.20


Jumlah Harga Bahan 124,192.20

Upah tenaga:
12 - Pekerja OH 0.100 100,000 10,000.00

- Tukang Listrik OH 0.100 150,000 15,000.00

- peralatan OH 1.000 0.00

Jumlah Upah Tenaga 25,000.00

Harga Upah dan Bahan 149,192.20


Biaya Umum & Keuntungan 10% 14,919.22

Dibulatkan 189,111

Pemasangan PJU Tenaga Surya (PJU 1)


Harga bahan:

- Kabel NYY 4x25mm m' 15.000 254,531 3,817,965.00

HARGA SATUAN PEKERJAAN (HSP) -81


HARGA SAT. DASAR
NO URAIAN SAT KUANTI TAS SUB TOTAL (Rp) HSP (Rp)
(Rp)
1 2 3 4 5 6 7

- tiang oktagonal 8m bh 1.000 6,775,000 6,775,000.00

- lampu pju flood lamp led 40 watt bh 3.000 2,250,000 6,750,000.00


- panel surya bh 5.000 2,450,000 12,250,000.00

- baterry 12v 200 ah bh 2.000 4,325,000 8,650,000.00

- box Baterry bh 1.000 950,000 950,000.00

- controler panel surya bh 1.000 447,000 447,000.00


- connector set 3.000 67,000 201,000.00

13 - dudukan Panel surya bh 5.000 347,000 1,735,000.00


- cctv ip camera bh 1.000 970,000 970,000.00

Jumlah Harga Bahan 42,545,965.00

Upah tenaga:
- Pekerja OH 2.250 100,000 225,000.00

- Tukang Listrik OH 0.670 150,000 100,500.00


- Mandor OH 0.020 200,000 4,000.00

Jumlah Upah Tenaga 329,500.00


Harga Upah dan Bahan 42,875,465.00

Biaya Umum & Keuntungan 10% 4,287,546.50

Dibulatkan 47,492,511

Pemasangan PJU Tenaga Surya (PJU2)


Harga bahan:

- Kabel NYY 4x25mm m' 5.000 254,531 1,272,655.00


- tiang oktagonal 8m bh 1.000 6,775,000 6,775,000.00

- lampu pju led 40 watt bh 1.000 2,250,000 2,250,000.00

- panel surya bh 1.000 2,450,000 2,450,000.00


- baterry 12v 120 ah bh 1.000 4,325,000 4,325,000.00

- box Baterry bh 1.000 950,000 950,000.00


- controler panel surya bh 1.000 447,000 447,000.00

- connector set 3.000 67,000 201,000.00


14
- dudukan Panel surya bh 1.000 347,000 347,000.00

Jumlah Harga Bahan 19,017,655.00


Upah tenaga:

- Pekerja OH 1.520 100,000 152,000.00

- Tukang Listrik OH 0.520 150,000 78,000.00

- mandor OH 0.020 200,000 4,000.00

Jumlah Upah Tenaga 234,000.00


Harga Upah dan Bahan 19,251,655.00

Biaya Umum & Keuntungan 10% 1,925,165.50


Dibulatkan 21,410,820

PEMASANGAN U DITCH 500 X 500 (SNI No.28 :2016 ) Per m²


Harga bahan:

- Pasir urug m³ 1.2 170,000 204,000.00


- U -Ditch 500 x 500 m² 0.833333333333333 750,000 625,000.00

- cover, Tutup u Ditch m133 1.66666666666667 247,200 412,000.00


Jumlah Harga Bahan 1,241,000

Peralatan:

- excavator m² 0.5305 456,300 242,067.15


Jumlah Harga Peralatan 242,067.15
15
Upah tenaga:
- Pekerja OH 0.2 100,000 20,000.00

- Tukang batu OH 0.07 150,000 10,500.00

- Kepala tukang OH 0.02 180,000 3,600.00

- Mandor OH 0.015 200,000 3,000.00

Jumlah Upah Tenaga 37,100.00


Jumlah Bahan & Tenaga 1,520,167.15

Biaya Umum & Keuntungan 10% 152,016.72


Dibulatkan 1,672,183

PEMASANGAN U DITCH 400 X 400 (SNI No.28 :2016 ) Per m²

Harga bahan:

HARGA SATUAN PEKERJAAN (HSP) -82


HARGA SAT. DASAR
NO URAIAN SAT KUANTI TAS SUB TOTAL (Rp) HSP (Rp)
(Rp)
1 2 3 4 5 6 7

- Pasir urug m³ 1.2 170,000 204,000.00

- U -Ditch 400 x 400 m² 0.833333333333333 498,000 415,000.00


- cover, Tutup u Ditch m133 1.66666666666667 187,200 312,000.00

Jumlah Harga Bahan 931,000

Peralatan:

- excavator m² 0.5305 456,300 242,067.15


16 Jumlah Harga Peralatan 242,067.15

Upah tenaga:
- Pekerja OH 0.2 100,000 20,000.00

- Tukang batu OH 0.07 150,000 10,500.00

- Kepala tukang OH 0.02 180,000 3,600.00


- Mandor OH 0.015 200,000 3,000.00

Jumlah Upah Tenaga 37,100.00


Jumlah Bahan & Tenaga 1,210,167.15

Biaya Umum & Keuntungan 10% 121,016.72


Dibulatkan 1,331,183

PEMASANGAN U DITCH 300 X 400 (SNI No.28 :2016 ) Per m²

Harga bahan:
- Pasir urug m³ 1.2 170,000 204,000.00

- U -Ditch 300 x 400 m² 0.833333333333333 445,200 371,000.00


- cover, Tutup u Ditch m133 1.66666666666667 123,600 206,000.00

Jumlah Harga Bahan 781,000


Peralatan:

- excavator m² 0.5305 456,300 242,067.15

Jumlah Harga Peralatan 242,067.15


17
Upah tenaga:

- Pekerja OH 0.2 100,000 20,000.00


- Tukang batu OH 0.07 150,000 10,500.00

- Kepala tukang OH 0.02 180,000 3,600.00


- Mandor OH 0.015 200,000 3,000.00

Jumlah Upah Tenaga 37,100.00


Jumlah Bahan & Tenaga 1,060,167.15

Biaya Umum & Keuntungan 10% 106,016.72

Dibulatkan 1,166,183

PEMASANGAN BOX CULVERT 400 X 400 (SNI No.28 :2016 ) Per m²

Harga bahan:
- Pasir urug m³ 1.2 212,000 254,400.00

- U -Ditch 300 x 400 m² 0.833333333333333 1,080,000 900,000.00


- cover, Tutup u Ditch m133 1.66666666666667 123,600 206,000.00

Jumlah Harga Peralatan 1,360,400

Peralatan:
- excavator m² 0.5305 456,300 242,067.15

Jumlah Harga Bahan 242,067.15


18
Upah tenaga:

- Pekerja OH 0.2 115,000 23,000.00


- Tukang batu OH 0.07 150,000 10,500.00

- Kepala tukang OH 0.02 170,000 3,400.00

- Mandor OH 0.015 200,000 3,000.00


Jumlah Upah Tenaga 39,900.00

Jumlah Bahan & Tenaga 1,642,367.15


Biaya Umum & Keuntungan 10% 164,236.72

Dibulatkan 1,806,603

Membuat lantai kerja beton mutu f'c=7,4 MPa (K-100) slump (3-6)cm w/c=0,87 tiap 1 m³ (SNI 7394:2008 An 6.4.)

Catatan: Bobot isi pasir = 1.400 kg/m³ ; bobot isi kerikil = 1.350 kg/m³; bulking factor pasir = 20% Pasir

Harga bahan: Kerikil


- Semen portland kg 230 1,600 368,000.00 SNI dlm kg

- Pasir beton m³ 0.687 263,000 180,681.00 ###


- Batu pecah/split 2/3 m³ 0.734 268,900 197,372.60 ###

- Air Ltr 200 515 103,000.00


Jumlah Harga Bahan 849,053.60

19. Upah tenaga:

HARGA SATUAN PEKERJAAN (HSP) -83


HARGA SAT. DASAR
NO URAIAN SAT KUANTI TAS SUB TOTAL (Rp) HSP (Rp)
(Rp)
19.
1 2 3 4 5 6 7

- Pekerja OH 1.2 100,000 120,000.00

- Tukang batu OH 0.2 150,000 30,000.00


- Kepala tukang OH 0.02 180,000 3,600.00

- Mandor OH 0.06 200,000 12,000.00

Jumlah Upah Tenaga 165,600.00

Jumlah Bahan & Tenaga 1,014,653.60


Biaya Umum & Keuntungan 10% 101,465.36

Dibulatkan 1,116,118

Memasang begisting cor 1 m2 (AHSP Cipta Karya-2013 A.3.2.1.2)

Harga bahan:
- papan 2x pakai m² 0.04 95,000 3,800.00

- Kaso 5/7 2xpakai m² 0.017 2,500,000 42,500.00


- paku kg 0.400 15,000 6,000.00

Jumlah Harga Bahan 52,300.00


Upah tenaga:

- Pekerja OH 0.12 100,000 12,000.00


20.
- Tukang kayu OH 0.15 150,000 22,500.00
- Tukang kayu 1/2 terampil OH 0.12 115,000 13,800.00

- Kepala tukang OH 0.3 180,000 54,000.00


- Mandor OH 0.02 200,000 4,000.00

Jumlah Upah Tenaga 106,300.00


Jumlah Bahan & Tenaga 158,600.00

Biaya Umum & Keuntungan 10% 15,860.00

Dibulatkan 174,460

Memasang cor beton 1m3 ( k300)


Harga bahan:

- semen sak 413 1,540 636,020.00


- split m³ 0.756 268,900 203,288.40

- pasir beton kg 0.486 263,000 127,818.00


air ltr 215.000 515 110,725.00

Jumlah Harga Bahan 1,077,851.40

Upah tenaga:
21.
- Pekerja OH 1.65 100,000 165,000.00

- Tukang Batu OH 0.275 150,000 41,250.00


- Kepala tukang OH 0.028 180,000 5,040.00

- Mandor OH 0.083 200,000 16,600.00


Jumlah Upah Tenaga 227,890.00

Jumlah Bahan & Tenaga 1,305,741.40

Biaya Umum & Keuntungan 10% 130,574.14


Dibulatkan 1,436,315

Memasang 1kg Pembesian


Harga bahan:

- besi beton kg 1.05 25,200 26,460.00


- kawat beton kg 0.010 28,200 282.00

Jumlah Harga Bahan 26,742.00

Upah tenaga:
22. - Tukang besi 1/2 terampil OH 0.007 125,000 875.00

- Kepala tukang besi OH 0.011 150,000 1,650.00


- Mandor OH 0.005 200,000 1,000.00

Jumlah Upah Tenaga 3,525.00

Jumlah Bahan & Tenaga 30,267.00

Biaya Umum & Keuntungan 10% 3,026.70

Dibulatkan 33,293
Fondasi Telapak dalam 1m3

Harga bahan:
- beton dalam 1m3 m³ 1 1,436,315 1,436,315.00

- Besi Beton kg 157.700 33,293 5,250,306.10


23.
- Begisting m2 0.700 174,460 122,122.00

Jumlah Upah Tenaga 6,808,743.10

HARGA SATUAN PEKERJAAN (HSP) -84


23. HARGA SAT. DASAR
NO URAIAN SAT KUANTI TAS SUB TOTAL (Rp) HSP (Rp)
(Rp)
1 2 3 4 5 6 7

Biaya Umum & Keuntungan 10% 7,489,617.41

Dibulatkan 7,489,617
analisa 1 kg besi profil

Harga bahan:

- besi profil kg 1.05 40,200 42,210.00

- kawat las kg 0.024 41,600 977.60


Jumlah Harga Bahan 43,187.60

Upah tenaga:
- pekerja OH 0.06 100,000 6,000.00
24.
- Tukang Las OH 0.06 150,000 9,000.00

- Kepala Tukang OH 0.006 180,000 1,080.00


- Mandor OH 0.003 200,000 600.00

Jumlah Upah Tenaga 16,680.00


Jumlah Bahan & Tenaga 59,867.60

Biaya Umum & Keuntungan 10% 5,986.76


Dibulatkan 65,854

pengeboran sumur bor kedalaman sedang


Harga bahan:

- solar liter 20 8,400 168,000.00


- oli hidrolis liter 3.000 10,500 31,500.00

- oli mesin liter 2.000 10,500 21,000.00


- bentonite kg 20.000 18,000 360,000.00

- peralatan pengeboran hari 1.000 175,000 175,000.00

Jumlah Harga Bahan 755,500.00


25. Upah tenaga:

- pekerja hari 2 100,000 200,000.00


- driller hari 1 170,000 170,000.00

- ass driller hari 1 110,000 110,000.00


- Operator hari 1 170,000 170,000.00

Jumlah Upah Tenaga 650,000.00


Jumlah Bahan & Tenaga 1,405,500.00

Biaya Umum & Keuntungan 10% 140,550.00

Dibulatkan 1,546,050

Pemasangan Batu Kosong (Aanstamping) AHSP 1.3.2.1.9 B


a
Harga bahan: h
a
- Batu kali m³ 1.2 268,900 322,680.00 PC
n
- Pasir urug m³ 0.432 170,000 73,440.00 Vol m³

Jumlah Harga Bahan 396,120.00

Upah tenaga:
- Pekerja OH 0.78 100,000 78,000.00 ###
26.
- Tukang batu OH 0.39 150,000 58,500.00 ###
- Kepala tukang OH 0.039 180,000 7,020.00 ###

- Mandor OH 0.039 200,000 7,800.00 ###


Jumlah Upah Tenaga 151,320.00

Jumlah Bahan & Tenaga 547,440.00

Biaya Umum & Keuntungan 10% 54,744.00


Dibulatkan 602,184

Memasang pondasi batu belah 1 PC : 4 PP tiap 1 m³ (AHSP Cipta Karya-2013 A.3.2.1.2) B


a
Harga bahan: h
a
- Batu kali m³ 1.2 268,900 322,680.00 PC
n
- Semen portland kg 163 1,600 260,800.00 PP

- Pasir pasang m³ 0.52 198,000 102,960.00 Vol m³

Jumlah Harga Bahan 686,440.00


Upah tenaga:

27. - Pekerja OH 1.5 100,000 150,000.00 ###


- Tukang batu OH 0.75 150,000 112,500.00 ###

- Kepala tukang OH 0.075 180,000 13,500.00 ###


- Mandor OH 0.075 200,000 15,000.00 ###

Jumlah Upah Tenaga 291,000.00

HARGA SATUAN PEKERJAAN (HSP) -85


27.

HARGA SAT. DASAR


NO URAIAN SAT KUANTI TAS SUB TOTAL (Rp) HSP (Rp)
(Rp)
1 2 3 4 5 6 7

Jumlah Bahan & Tenaga 977,440.00

Biaya Umum & Keuntungan 10% 97,744.00


Dibulatkan 1,075,184

Memasang dinding bata merah (5x11x22) cm tebal ½ bata, 1 PC : 2 PP tiap 1 m²

Harga bahan: tebal dinding


- Bata merah m³ 70 2,500 175,000.00 l bata

- Semen portland kg 18.95 1,600 30,320.00 t bata


- Pasir pasang m³ 0.038 198,000 7,524.00 t siar

Jumlah Harga Bahan 212,844.00

Upah tenaga: komposisi PP


28. - Pekerja OH 0.3 100,000 30,000.00 Pekerja

- Tukang batu OH 0.1 150,000 15,000.00 Tukang


- Kepala tukang OH 0.01 180,000 1,800.00 Kepala tukang

- Mandor OH 0.015 200,000 3,000.00 Mandor


Jumlah Upah Tenaga 49,800.00

Jumlah Bahan & Tenaga 262,644.00

Biaya Umum & Keuntungan 10% 26,264.40


Dibulatkan 288,908

Memasang plesteran 1 PC : 3 PP tebal 15 mm tiap 1 m² (AHSP Cipta Karya-2013 A.4.4.2.3) B


a
Harga bahan: h
a
- Semen portland kg 7.776 1,600 12,441.60 PC
n
- Pasir pasang m³ 0.023 198,000 4,554.00 PP

Jumlah Harga Bahan 16,995.60

Upah tenaga:
- Pekerja OH 0.3 100,000 30,000.00 ###
29.
- Tukang batu OH 0.15 150,000 22,500.00 ###
- Kepala tukang OH 0.015 180,000 2,700.00 ###

- Mandor OH 0.015 200,000 3,000.00 ###


Jumlah Upah Tenaga 58,200.00

Jumlah Bahan & Tenaga 75,195.60


Biaya Umum & Keuntungan 10% 7,519.56

Dibulatkan 82,715

Memasang acian tiap 1 m² (AHSP Cipta karya-2013 A.4.4.2.27)

Harga bahan:

- Semen portland kg 3.25 1,600 5,200.00


Jumlah Harga Bahan 5,200.00

Upah tenaga:
- Pekerja OH 0.12 100,000 12,000.00

30. - Tukang batu OH 0.1 150,000 15,000.00

- Kepala tukang OH 0.01 180,000 1,800.00


- Mandor OH 0.006 200,000 1,200.00

Jumlah Upah Tenaga 30,000.00


Jumlah Bahan & Tenaga 35,200.00

Biaya Umum & Keuntungan 10% 3,520.00


Dibulatkan 38,720

Memasang dinding keramik (20 x 40) cm tiap 1 m² (AHSP Cipta Karya-2016 A.4.4.3.54.a)

Harga bahan:
- Keramik 20 x 40 (JTS) bh 12.5 6,400 80,000.00

- Semen portland kg 9.3 1,600 14,880.00


- Pasir pasang m³ 0.018 198,000 3,564.00

- Semen portland warna kg 1.94 25,000 48,500.00

Jumlah Harga Bahan 146,944.00

Upah tenaga:
31.
- Pekerja OH 0.9 100,000 90,000.00 ###
- Tukang batu OH 0.45 150,000 67,500.00 ###

- Kepala tukang OH 0.045 180,000 8,100.00 ###


- Mandor OH 0.045 200,000 9,000.00 ###

Jumlah Upah Tenaga 174,600.00


Jumlah Bahan & Tenaga 321,544.00

Biaya Umum & Keuntungan 10% 32,154.40

HARGA SATUAN PEKERJAAN (HSP) -86


31.

HARGA SAT. DASAR


NO URAIAN SAT KUANTI TAS SUB TOTAL (Rp) HSP (Rp)
(Rp)
1 2 3 4 5 6 7

Dibulatkan 353,698
1 m² Pasangan Keramik Lantai 60x60 cm (modifikasi AHSP Cipta karya-2013 A.4.4.3.1)
Harga Bahan
- Keramik 60 x 60 cm bh 2.947 50,400 148512
- Semen Portland kg 9.8 1,600 15680
- Pasir Pasang m³ 0.045 198,000 8910
- Semen Portland Warna kg 1.3 25,000 32500
Jumlah Harga Bahan 205602
Harga Upah
32
- Pekerja OH 0.25 100,000 25000
- Tukang Batu OH 0.125 150,000 18750
- Kepala Tukang OH 0.013 180,000 2340
- Mandor OH 0.013 200,000 2600
Jumlah Upah Tenaga 48690
Jumlah Harga Bahan dan Upah 254292
Biaya Umum dan Keuntungan (10%) 25429.2
Jumlah Harga Bahan dan Upah 279,000
1 m² Pasangan Keramik Lantai 50x50 cm (AHSP Cipta Karya-2013 A.4.4.3.4)
Harga Bahan
- Keramik 50 x 50 cm bh 4.200 27,000 113400
- Semen Portland kg 9.8 1,600 15680
- Pasir Pasang m³ 0.045 198,000 8910
- Semen Portland Warna kg 1.3 25,000 32500
Jumlah Harga Bahan 170490
Harga Upah
33
- Pekerja OH 0.25 100,000 25000
- Tukang Batu OH 0.125 150,000 18750
- Kepala Tukang OH 0.013 180,000 2340
- Mandor OH 0.013 200,000 2600
Jumlah Upah Tenaga 48690
Jumlah Harga Bahan dan Upah 219180
Biaya Umum dan Keuntungan (10%) 21918
Jumlah Harga Bahan dan Upah 241,000
1 m² Pasangan Keramik Lantai 40x40 cm (AHSP Cipta Karya-2013 A.4.4.3.4)
Harga Bahan
- Keramik 40 x 40 cm bh 6.630 14,400 95472
- Semen Portland kg 9.8 1,600 15680
- Pasir Pasang m³ 0.045 198,000 8910
- Semen Portland Warna kg 1.3 25,000 32500
Jumlah Harga Bahan 152562
Harga Upah
34
- Pekerja OH 0.25 100,000 25000
- Tukang Batu OH 0.125 150,000 18750
- Kepala Tukang OH 0.013 180,000 2340
- Mandor OH 0.013 200,000 2600
Jumlah Upah Tenaga 48690
Jumlah Harga Bahan dan Upah 201252
Biaya Umum dan Keuntungan (10%) 20125.2
Jumlah Harga Bahan dan Upah 221,000
Membuat beton mutu f'c=14,5 MPa (K-175) slump (12±2)cm w/c=0,66 tiap 1 m³ (AHSP Cipta Karya-2013 A.4.1.1.5)

Harga bahan:
Semen portland kg 326 1,600 521,600.00

Pasir beton m³ 0.585 263,000 153,855.00


Batu pecah/split 2/3 m³ 0.735 268,900 197,641.50

Air Ltr 215 515 110,725.00

Jumlah Harga Bahan 983,821.50


Upah tenaga:
35.
Pekerja OH 1.65 100,000 165,000.00
Tukang Batu OH 0.275 150,000 41,250.00

Kepala Tukang OH 0.0275 180,000 4,950.00


Mandor OH 0.0825 200,000 16,500.00

Jumlah Upah Tenaga 227,700.00

Jumlah Bahan, Tenaga & Alat 1,211,521.50


Biaya Umum & Keuntungan 10% 121,152.15

Dibulatkan 1,332,673

Memasang langit-langit gypsum board 9 mm tiap 1 m² (AHSP Cipta Karya-2013 A.4.5.1.7)


Harga bahan:

- Gypsumboard (1200x2400x9) mm lbr 0.364 120,000 43,680.00

- Paku sekrup 3,5" kg 0.11 45,000 4,950.00


Jumlah Harga Bahan 48,630.00

Upah tenaga:
- Pekerja OH 0.1 100,000 10,000.00
36.

HARGA SATUAN PEKERJAAN (HSP) -87


HARGA SAT. DASAR
NO URAIAN SAT KUANTI TAS SUB TOTAL (Rp) HSP (Rp)
(Rp)
1 2 3 4 5 6 7
36.
- Tukang kayu OH 0.05 150,000 7,500.00

- Kepala tukang OH 0.005 180,000 900.00


- Mandor OH 0.005 200,000 1,000.00

Jumlah Upah Tenaga 19,400.00

Jumlah Bahan & Tenaga 68,030.00

Biaya Umum & Keuntungan 10% 6,803.00


Dibulatkan 74,833

Memasang list langit-langit kayu profil tiap 1 m' (SNI 2839:2008 An 6.10.)
Harga bahan:

- List gypsum m' 1.05 50,000 52,500.00

- Paku biasa 1/2"- 1" kg 0.01 25,000 250.00


Jumlah Harga Bahan 52,750.00

Upah tenaga:
- Pekerja OH 0.05 100,000 5,000.00
37.
- Tukang kayu OH 0.05 150,000 7,500.00
- Kepala tukang OH 0.005 180,000 900.00

- Mandor OH 0.0025 200,000 500.00

Jumlah Upah Tenaga 13,900.00


Jumlah Bahan & Tenaga 66,650.00

Biaya Umum & Keuntungan 10% 6,665.00


Dibulatkan 73,315

Memasang 1 m2 rangka besi hollow 1 x 40.40.2mm, modul 60 x 60 cm, plafon ( AHSP Cipta Karya-2013 A.4.2.1.21)
Harga bahan:

- Hollow 4x4 cm tbl 0.35 mm M1 4 27,000 108,000.00

- Assesoris (perkuatan, las, dll) Ls 100% 27,000 27,000.00


Jumlah Harga Bahan 135,000.00

Upah tenaga:
- Pekerja OH 0.35 100,000 35,000.00
38.
- Tukang besi OH 0.35 150,000 52,500.00
- Kepala tukang OH 0.035 180,000 6,300.00

- Mandor OH 0.018 200,000 3,600.00


Jumlah Upah Tenaga 97,400.00

Jumlah Bahan & Tenaga 232,400.00

Biaya Umum & Keuntungan 10% 23,240.00

Dibulatkan 255,640

Pengecatan langit-langit dengan roll, plamur + 2 lapis cat KW 2 tiap 1 m² (Pt-T-38-2000-C Tabel 1 No 7)

Harga bahan:
- Kapi bh 0.05 20,000 1,000.00

- Plamir tembok kg 0.1 52,800 5,280.00

- Amplas lbr 0.5 7,000 3,500.00


- Cat tembok setara metrolite kg 0.47 33,000 15,510.00

- Kuas roll bh 0.01 45,000 450.00


Jumlah Harga Bahan 25,740.00

39. Upah tenaga:


- Pekerja OH 0.06 100,000 6,000.00

- Tukang cat OH 0.04 150,000 6,000.00

- Kepala tukang OH 0.004 180,000 720.00


- Mandor OH 0.003 200,000 600.00

Jumlah Upah Tenaga 13,320.00


Jumlah Bahan & Tenaga 39,060.00

Biaya Umum & Keuntungan 10% 3,906.00

Dibulatkan 42,966

Pengecatan bidang tembok dengan roll 2 lapis cat Dulux/ICI tiap 1 m²

Harga bahan:
- Cat tembok Dulux/ICI kg 0.47 88,200 41,454.00

- Kuas roll bh 0.01 45,000 450.00


Jumlah Harga Bahan 41,904.00

Upah tenaga:
- Pekerja OH 0.04 100,000 4,000.00
40.
- Tukang cat OH 0.03 150,000 4,500.00

HARGA SATUAN PEKERJAAN (HSP) -88


HARGA SAT. DASAR
NO URAIAN SAT KUANTI TAS SUB TOTAL (Rp) HSP (Rp)
(Rp)
40.
1 2 3 4 5 6 7

- Kepala tukang OH 0.003 180,000 540.00

- Mandor OH 0.002 200,000 400.00


Jumlah Upah Tenaga 9,440.00

Jumlah Bahan & Tenaga 51,344.00

Biaya Umum & Keuntungan 10% 5,134.40

Dibulatkan 56,478
Pemasangan 1 m2 Kaca Cermin Tebal 5mm (AHSP A.4.6.2.20)

Harga bahan:
- Cermin m2 1.1 130,000 143,000.00

Jumlah Harga Bahan 143,000.00

Upah tenaga:
- Pekerja OH 0.017 100,000 1,700.00

41. - Tukang kayu OH 0.17 150,000 25,500.00


- Kepala tukang OH 0.017 180,000 3,060.00

- Mandor OH 0.0009 200,000 180.00


Jumlah Upah Tenaga 30,440.00

Jumlah Bahan & Tenaga 173,440.00

Biaya Umum & Keuntungan 10% 17,344.00


Dibulatkan 190,784

Memasang 1 buah kloset duduk/monoblok setara INA (sedang) (RSNI T-15-2002 An 6.1.)

Harga bahan:
- Klosed duduk (CW 420J-SW420JP) bh 1 1,888,000 1,888,000.00

- Perlengkapan (6% harga kloset) % 6 1,888,000 113,280.00

Jumlah Harga Bahan 2,001,280.00


Upah tenaga:

- Pekerja OH 3.3 100,000 330,000.00


42.
- Tukang batu OH 1.1 150,000 165,000.00

- Kepala tukang OH 0.001 180,000 180.00


- Mandor OH 0.16 200,000 32,000.00

Jumlah Upah Tenaga 527,180.00


Jumlah Bahan & Tenaga 2,528,460.00

Biaya Umum & Keuntungan 10% 252,846.00

Dibulatkan 2,781,306

Memasang 1 buah wastafel (RSNI T-15-2002 An 6.5.)

Harga bahan:
- Wastafel Toto LW246 bh 1 430,000 430,000.00

- Perlengkapan (12% harga wastafel) % 12 430,000 51,600.00


- Semen portland kg 6 1,600 9,600.00

- Pasir pasang m³ 0.01 198,000 1,980.00

Jumlah Harga Bahan 493,180.00


Upah tenaga:
43.
- Pekerja OH 1.2 100,000 120,000.00
- Tukang batu OH 1.45 150,000 217,500.00

- Kepala tukang OH 0.15 180,000 27,000.00


- Mandor OH 0.1 200,000 20,000.00

Jumlah Upah Tenaga 384,500.00

Jumlah Bahan & Tenaga 877,680.00


Biaya Umum & Keuntungan 10% 87,768.00

Dibulatkan 965,448
Memasang 1 buah bak cuci piring stainlessteel (AHSP Cipta Karya-2013 A.5.1.1.12)

Harga bahan:

- Bak cuci stainless steel Unit 1 800,000 800,000.00

- Perlengkapan (12% harga wastafel) % 12 800,000 96,000.00

- Semen portland kg 6 1,600 9,600.00


- Pasir pasang m³ 0.01 198,000 1,980.00

Jumlah Harga Bahan 907,580.00


Upah tenaga:
44.
- Pekerja OH 1.2 100,000 120,000.00
- Tukang batu OH 1.45 150,000 217,500.00

- Kepala tukang OH 0.15 180,000 27,000.00

HARGA SATUAN PEKERJAAN (HSP) -89


44.
HARGA SAT. DASAR
NO URAIAN SAT KUANTI TAS SUB TOTAL (Rp) HSP (Rp)
(Rp)
1 2 3 4 5 6 7

- Mandor OH 0.1 200,000 20,000.00

Jumlah Upah Tenaga 384,500.00


Jumlah Bahan & Tenaga 1,292,080.00

Biaya Umum & Keuntungan 10% 129,208.00

Dibulatkan 1,421,288

Memasang 1 buah jet washer (RSNI T-15-2002 An 6.35.)


Harga bahan:

- Jet Washer bh 1 430,000 430,000.00


- Seal tape bh 0.25 3,000 7.50

Jumlah Harga Bahan 430,007.50

Upah tenaga:
45.
- Tukang pasang pipa OH 0.1 150,000 15,000.00

- Kepala tukang pasang pipa OH 0.01 180,000 1,800.00


Jumlah Upah Tenaga 16,800.00

Jumlah Bahan & Tenaga 446,807.50


Biaya Umum & Keuntungan 10% 44,680.75

Dibulatkan 491,488

Memasang 1 buah shower spreay (RSNI T-15-2002 An 6.35.)


Harga bahan:

- Shower Spreay (TX 403 SB) bh 1 245,000 245,000.00


- Seal tape bh 0.25 3,000 7.50

Jumlah Harga Bahan 245,007.50


Upah tenaga:
46.
- Tukang pasang pipa OH 0.1 150,000 15,000.00

- Kepala tukang pasang pipa OH 0.01 180,000 1,800.00


Jumlah Upah Tenaga 16,800.00

Jumlah Bahan & Tenaga 261,807.50


Biaya Umum & Keuntungan 10% 26,180.75

Dibulatkan 287,988
Memasang 1 floor drain stainless (RSNI T-15-2002 An 6.36.)

Harga bahan:
- Floor drain stainless bh 1 330,000 330,000.00

Jumlah Harga Bahan 330,000.00

Upah tenaga:

47. - Tukang batu OH 0.1 150,000 15,000.00

- Kepala tukang OH 0.01 180,000 1,800.00


Jumlah Upah Tenaga 16,800.00

Jumlah Bahan & Tenaga 346,800.00


Biaya Umum & Keuntungan 10% 34,680.00

Dibulatkan 381,480

Memasang kaca cermin tebal 5 mm tiap 1 m² (AHSP Cipta Karya-2013 A.4.6.2.20)


Harga bahan:

- Kaca 5 mm m² 1.1 218,000 239,800.00


Jumlah Harga Bahan 239,800.00

Upah tenaga:
- Pekerja OH 0.015 100,000 1,500.00

48. - Tukang kayu OH 0.15 150,000 22,500.00

- Kepala tukang OH 0.015 180,000 2,700.00


- Mandor OH 0.008 200,000 1,600.00

Jumlah Upah Tenaga 28,300.00


Jumlah Bahan & Tenaga 268,100.00

Biaya Umum & Keuntungan 10% 26,810.00

Dibulatkan 294,910

Memasang 1 buah kran dia 3/4" atau 1/2" stainless (RSNI T-15-2002 An 6.35.)

Harga bahan:
- Kran air stainless bh 1 105,000 105,000.00

- Seal tape bh 0.25 3,000 750.00


Jumlah Harga Bahan 105,750.00

Upah tenaga:
49.
- Tukang pasang pipa OH 0.1 150,000 15,000.00

- Kepala tukang pasang pipa OH 0.01 180,000 1,800.00

HARGA SATUAN PEKERJAAN (HSP) -90


49. HARGA SAT. DASAR
NO URAIAN SAT KUANTI TAS SUB TOTAL (Rp) HSP (Rp)
(Rp)
1 2 3 4 5 6 7

Jumlah Upah Tenaga 16,800.00

Jumlah Bahan & Tenaga 122,550.00


Biaya Umum & Keuntungan 10% 12,255.00

Dibulatkan 134,805

Memasang 1 buah urinoir U57 WW

Harga bahan:
- Urinoir bh 1 1,885,000 1,885,000.00

- Pasir pasang m3 0.01 198,000 1,980.00


- Semen portland kg 6 1,600 9,600.00

- Perlengkapan 30% harga urinoir % 30 1,885,000 565,500.00

Jumlah Harga Bahan 2,462,080.00


Upah tenaga:
50.
- Pekerja OH 1 100,000 100,000.00
- Tukang batu OH 1 150,000 150,000.00

- Kepala tukang OH 0.1 180,000 18,000.00


- Mandor OH 0.01 200,000 2,000.00

Jumlah Upah Tenaga 270,000.00

Jumlah Bahan & Tenaga 2,732,080.00


Biaya Umum & Keuntungan 10% 273,208.00

Dibulatkan 3,005,288

Memasang konstruksi atap rangka baja ringan tiap 1 m²


Harga bahan dan tenaga:

- Atap baja ringan (terpasang) m² 1 235,000 235,000.00


51.
Jumlah Bahan & Tenaga 235,000.00
Biaya Umum & Keuntungan 10% 23,500.00

Dibulatkan 258,500
Memasang atap genteng metal tiap 1 m² (AHSP Cipta Karya-2013 A.4.5.2.32)

Harga bahan:
- Genteng metal bh 2 38,000 76,000.00

- Paku biasa 2"-5" kg 0.2 15,000 3,000.00


Jumlah Harga Bahan 79,000.00

Upah tenaga:

- Pekerja OH 0.2 100,000 20,000.00


52.
- Tukang kayu OH 0.1 150,000 15,000.00

- Kepala tukang OH 0.01 180,000 1,800.00


- Mandor OH 0.001 200,000 200.00

Jumlah Upah Tenaga 37,000.00


Jumlah Bahan & Tenaga 116,000.00

Biaya Umum & Keuntungan 10% 11,600.00

Dibulatkan 127,600
Memasang atap asbes gelomban tiap 1 m² (3 x 1,05 ) 4mm

Harga bahan:
- Asbes Gelombang Lbr 0.35 81,000 28,350.00

- Paku seng kg 0.12 25,000 3,000.00


Jumlah Harga Bahan 31,350.00

Upah tenaga:

- Pekerja OH 0.14 100,000 14,000.00


53.
- Tukang kayu OH 0.07 150,000 10,500.00

- Kepala tukang OH 0.007 180,000 1,260.00


- Mandor OH 0.007 200,000 1,400.00

Jumlah Upah Tenaga 27,160.00

Jumlah Bahan & Tenaga 58,510.00

Biaya Umum & Keuntungan 10% 5,851.00

Dibulatkan 64,361
Memasang nok genteng metal tiap 1 m' (AHSP Cipta Karya-2013 A.4.5.2.36)

Harga bahan:
- Nok genteng metal bh 1.1 28,000 30,800.00

- Paku biasa 1/2"- 1" kg 0.05 25,000 1,250.00


Jumlah Harga Bahan 32,050.00

Upah tenaga:

54.
HARGA SATUAN PEKERJAAN (HSP) -91
HARGA SAT. DASAR
NO URAIAN SAT KUANTI TAS SUB TOTAL (Rp) HSP (Rp)
(Rp)
1 2 3 4 5 6 7

- Pekerja OH 0.25 100,000 25,000.00


54.
- Tukang kayu OH 0.15 150,000 22,500.00
- Kepala tukang OH 0.015 180,000 2,700.00

- Mandor OH 0.013 200,000 2,600.00

Jumlah Upah Tenaga 52,800.00

Jumlah Bahan & Tenaga 84,850.00


Biaya Umum & Keuntungan 10% 8,485.00

Dibulatkan 93,335
1 m2 Alucopan

Harga bahan:

- Alumunium Composite m2 1.1 425,000 467,500.00


- Hollo Besi Galvanis Uk 4x4x1mm btg 0.8 115,000 92,000.00

- Braket Siku/Spigot/Stiffener btg 0.267 60,000 16,020.00


- Paku Skrup Beton kg 0.08 35,700 2,856.00

- Paku Skrup kg 0.11 45,000 4,950.00


- Sealent tube 0.25 52,500 13,125.00

Jumlah Harga Bahan 596,451.00

Harga bahan:
- Sewa stager (2set) set 0.02 110,000 2,200.00

55. - Listrik kerja ls 1 5,000 5,000.00


- alat bantu lainnya ls 1 10,000 10,000.00

Jumlah Harga Bahan 17,200.00


Upah tenaga:

- Pekerja OH 0.39 100,000 39,000.00

- Tukang besi/las OH 0.7 150,000 105,000.00


- Kepala tukang besi OH 0.07 180,000 12,600.00

- Mandor OH 0.007 200,000 1,400.00


Jumlah Upah Tenaga 158,000.00

Jumlah Bahan & Tenaga 771,651.00


Biaya Umum & Keuntungan 10% 77,165.10

Dibulatkan 848,816
Memasang lisplank Kayu lebar 50 cm tebal 6mm

Harga bahan:

- Lisplank Kayu Jati m' 1.1 125,000 137,500.00

- Paku biasa 2"-5" kg 0.05 15,000 750.00

Jumlah Harga Bahan 138,250.00


Upah tenaga:

- Pekerja OH 0.1 100,000 10,000.00


56.
- Tukang kayu OH 0.2 150,000 30,000.00

- Kepala tukang OH 0.02 180,000 3,600.00

- Mandor OH 0.005 200,000 1,000.00


Jumlah Upah Tenaga 44,600.00

Jumlah Bahan & Tenaga 182,850.00


Biaya Umum & Keuntungan 10% 18,285.00

Dibulatkan 201,135
Mengurug pasir urug tiap 1 m³ (AHSP Cipta Karya-2013 A. 2.3.1.11)

Harga bahan:

- Pasir urug m³ 1.2 170,000 204,000.00


Jumlah Harga Bahan 204,000.00

Upah tenaga:
57. - Pekerja OH 0.3 100,000 30,000.00

- Mandor OH 0.01 200,000 2,000.00

Jumlah Upah Tenaga 32,000.00

Jumlah Bahan & Tenaga 236,000.00

Biaya Umum & Keuntungan 10% 23,600.00


Dibulatkan 259,600

Memasang 1 buah Stop kontak 1ph, 10A


- Stop kontak bh 1 78,000 78,000.00

- wiring ls 1 780 780.00


58. - Biaya Pasang ls 1 3,939 3,939.00

Jumlah 82,719.00

HARGA SATUAN PEKERJAAN (HSP) -92


HARGA SAT. DASAR
NO
58. URAIAN SAT KUANTI TAS SUB TOTAL (Rp) HSP (Rp)
(Rp)
1 2 3 4 5 6 7

Biaya Umum & Keuntungan 10% 8,271.90

Dibulatkan 90,990
Memasang 1 buah Saklar ganda

- saklar ganda bh 1 58,000 58,000.00

- wiring ls 1 580 580.00

59. - Biaya Pasang ls 1 2,929 2,929.00


Jumlah 61,509.00

Biaya Umum & Keuntungan 10% 6,150.90


Dibulatkan 67,659

Memasang 1 buah Saklar tunggal

- saklar tunggal bh 1 42,000 42,000.00


- wiring ls 1 420 420.00

60. - Biaya Pasang ls 1 2,121 2,121.00


Jumlah 44,541.00

Biaya Umum & Keuntungan 10% 4,454.10


Dibulatkan 48,995
1 Titik pasang lampu T8 LED 16 Watt
Harga Bahan
- Lampu T8 LED 16 Watt bh 1.000 110,000 110000
- Aksesoris % 10 110,000 11,000
Jumlah Harga Bahan 121000
Harga Upah
61
- Pekerja OH 0.006 100,000 600
- Instalatir OH 0.12 150,000 18000
Jumlah Upah Tenaga 18600
Jumlah Harga Bahan dan Upah 139600
Biaya Umum dan Keuntungan (10%) 13960
Jumlah Harga Bahan dan Upah 153,000
1 Titik pasang lampu Downlight LED 36 wat
Harga Bahan
- DL LED 36 W bh 1.000 195,000 195000
- Wiring ls 1 1,950 1950
62
- Biaya Pasang ls 1 1,970 1969.5
Jumlah 198919.5
Biaya Umum dan Keuntungan (10%) 19891.95
Jumlah Harga Bahan dan Upah 218,811
1 Titik pasang lampu Downlight LED SL 16 Watt
Harga Bahan
- DL LED 16 W bh 1.000 80,000 80000
- Wiring ls 1 800 800
63
- Biaya Pasang ls 1 808 808
Jumlah 81608
Biaya Umum dan Keuntungan (10%) 8160.8
Jumlah Harga Bahan dan Upah 89,769
1 Titik pasang lampu Downlight
Harga Bahan
- Lampu Downlight bh 1.000 100,000 100000
- Aksesoris % 10 100,000 10,000
Jumlah Harga Bahan 110000
Harga Upah
64
- Pekerja OH 0.006 100,000 600
- Instalatir OH 0.12 150,000 18000
Jumlah Upah Tenaga 18600
Jumlah Harga Bahan dan Upah 128600
Biaya Umum dan Keuntungan (10%) 12860
Jumlah Harga Bahan dan Upah 141,000
1 Titik pasang lampu Spotlight
Harga Bahan
- Lampu Spotlight bh 1.000 105,000 105000
- Aksesoris % 10 105,000 10,500
Jumlah Harga Bahan 115500
Harga Upah
65
- Pekerja OH 0.006 100,000 600
- Instalatir OH 0.12 150,000 18000
Jumlah Upah Tenaga 18600
Jumlah Harga Bahan dan Upah 134100
Biaya Umum dan Keuntungan (10%) 13410
Jumlah Harga Bahan dan Upah 147,000
Memasang 1 buah Panel unit (P-Unit)
Harga Bahan
- MCB 1 Phase, 10 Amp bh 3.000 75,000 225000
- MCB 1 Phase, 20 Amp bh 1 75,000 75000
66
- MCB box isi 4 ls 1 88,031 88031
Jumlah 388031
Biaya Umum dan Keuntungan (10%) 38803.1
Jumlah Harga Bahan dan Upah 426,834
Memasang 1 buah KWH meter 1 phase

HARGA SATUAN PEKERJAAN (HSP) -93


67
HARGA SAT. DASAR
NO URAIAN SAT KUANTI TAS SUB TOTAL (Rp) HSP (Rp)
(Rp)
1 2 3 4 5 6 7
Harga Bahan
- KWH Meter bh 1.000 4,283,600 4283600
- Wiring ls 1 42,836 42836
67
- Biaya Pasang ls 1 216,322 216321.8
Jumlah 4542757.8
Biaya Umum dan Keuntungan (10%) 454275.78
Jumlah Harga Bahan dan Upah 4,997,034
Membuat 1 M3 beton mutu K-225
Harga bahan:

Semen portland kg 371 1,540.00 571,340.00


Pasir beton m³ 0.499 263,000.00 131,237.00

Batu pecah/split 2/3 m³ 0.776 268,900.00 208,666.40

Air Ltr 215 515.00 110,725.00


Jumlah Harga Bahan 1,021,968.40

Upah tenaga:
68
Pekerja OH 1.65 100,000 165,000.00

Tukang Batu OH 0.275 150,000.00 41,250.00


Kepala Tukang OH 0.0275 180,000.00 4,950.00

Mandor OH 0.0825 200,000.00 16,500.00

Jumlah Upah Tenaga 227,700.00


Jumlah Bahan, Tenaga & Alat 1,249,668.40

Biaya Umum & Keuntungan 10% 124,966.84


Dibulatkan 1,374,635

Membuat 1 M3 beton mutu K-125 AHSP A.4.1.1.2


Harga bahan:

Semen portland kg 276 1,540.00 425,040.00

Pasir beton m³ 0.591 263,000.00 155,433.00


Batu pecah/split 2/3 m³ 0.74963 268,900.00 201,575.51

Air Ltr 215 515.00 110,725.00


Jumlah Harga Bahan 892,773.51

Upah tenaga:
69
Pekerja OH 1.65 100,000 165,000.00

Tukang Batu OH 0.275 150,000.00 41,250.00


Kepala Tukang OH 0.0275 180,000.00 4,950.00

Mandor OH 0.0825 200,000.00 16,500.00

Jumlah Upah Tenaga 227,700.00


Jumlah Bahan, Tenaga & Alat 1,120,473.51

Biaya Umum & Keuntungan 10% 112,047.35


Dibulatkan 1,232,520

Membuat 1 kg Konstruksi Baja WF


Harga bahan:

- Baja WF kg 1.050 15,400.00 16,170.00

- Kawat las kg 0.050 41,600.00 2,080.00


- Elpiji / oksigen ls 1.000 500.00 500.00

- Fabrikasi ls 1.000 2,250.00 2,250.00


- Meni + Pengecatan Baja kg 1.000 1,500.00 1,500.00

70 Jumlah Harga Bahan 22,500.00

Upah tenaga:

- Upah Erection ls 1.00 2,250 2,250.00

- Alat Bantu ls 1.00 750.00 750.00


Jumlah Upah Tenaga 3,000.00

Jumlah Bahan, Tenaga & Alat 25,500.00


Biaya Umum & Keuntungan 10% 2,550.00

Dibulatkan 28,050

Pasir yang dipadatkan

Harga bahan dan Alat:

Pasir Urug m3 1.200 170,000.00 204,000.00

Alat Bantu Ls 1.000 5,000.00 5,000.00

Jumlah Harga Bahan 209,000.00


71

HARGA SATUAN PEKERJAAN (HSP) -94


HARGA SAT. DASAR
NO URAIAN SAT KUANTI TAS SUB TOTAL (Rp) HSP (Rp)
(Rp)
1 2 3 4 5 6 7

71 Upah tenaga:

Pekerja OH 0.30 100,000 30,000.00


Mandor OH 0.010 200,000.00 2,000.00

Jumlah Upah Tenaga 32,000.00


Jumlah Bahan, Tenaga & Alat 241,000.00

Biaya Umum & Keuntungan 10% 24,100.00


Dibulatkan 265,100

Batu Pecah CBR>80%

Harga bahan:
Batu pecah/split 3/4 m3 1.200 268,900.00 322,680.00

Jumlah Harga Bahan 322,680.00


Upah tenaga:

Pekerja OH 0.0045 100,000.00 450.00


Mandor OH 0.0233 200,000.00 4,660.00

72

Jumlah Upah Tenaga 5,110.00

Harga Alat:
Dump Truck jam 0.1030 450,000.00 46,350.00

Motor Grader jam 0.1030 950,000.00 97,850.00


Vibro Roller jam 0.0936 468,000.00 43,804.80

Water Tanker jam 0.1030 287,918.00 29,655.55


Jumlah harga Alat 217,660.35

Jumlah Bahan, Tenaga & Alat 545,450.35


Biaya Umum & Keuntungan 10% 54,545.04

Dibulatkan 599,995

CTB K.100

Harga bahan:

Semen Portland kg 230.000 1,600.00 368,000.00


Batu Pecah 3/4 m3 0.57060 268,900.00 153,434.34

Pasir Beton m3 0.6379 263,000.00 167,767.70

Jumlah Harga Bahan 689,202.04

Upah tenaga:
Pekerja OH 0.5000 100,000.00 50,000.00

Mandor OH 0.0543 200,000.00 10,860.00

73

Jumlah Upah Tenaga 60,860.00


Harga Alat:

Dump Truck jam 0.1250 450,000.00 56,250.00


Motor Grader jam 0.1250 950,000.00 118,750.00

Vibro Roller jam 0.1250 468,000.00 58,500.00

Concrete mixer 7 HP jam 0.1250 160,000.00

Water Tanker jam 0.1250 287,918.00 35,989.75

Jumlah harga Alat 269,489.75


Jumlah Bahan, Tenaga & Alat 1,019,551.79

Biaya Umum & Keuntungan 10% 101,955.18


Dibulatkan 1,121,506

Pemasangan Paving Block K-500, t =10cm

HARGA SATUAN PEKERJAAN (HSP) -95


HARGA SAT. DASAR
NO URAIAN SAT KUANTI TAS SUB TOTAL (Rp) HSP (Rp)
(Rp)
1 2 3 4 5 6 7

Harga bahan:
Paving Block t=10cm m2 1.0000 168,000.00 168,000.00

Jumlah Harga Bahan 168,000.00

74 Upah dan Alat:


Pemasangan Ls 1.0000 10,000.00 (10,000.00)

Jumlah Upah Tenaga (10,000.00)


Jumlah Bahan, Tenaga & Alat 158,000.00

Biaya Umum & Keuntungan 10% 15,800.00


Dibulatkan 173,800

Pembersihan Lahan (Stripping, t=0,2 m)

Harga Upah:
Pekerja OH 0.0045 100,000.00 450.00

Mandor OH 0.0330 200,000.00 6,600.00

Jumlah Harga Bahan 7,050.00


Harga Alat:
75
Dump Truck jam 0.0090 450,000.00 4,050.00
Excavator jam 0.0107 862,000.00 9,223.40

Bulldozer jam 0.0416 878,000.00 36,524.80

Jumlah harga Alat 49,798.20

Jumlah Bahan, Tenaga & Alat 56,848.20

Biaya Umum & Keuntungan 10% 5,684.82

Dibulatkan 62,533

Pembersihan Lahan (Grubbing & Clearing)

Harga Upah:

Pekerja OH 0.0589 100,000.00 5,890.00

Mandor OH 0.0132 200,000.00 2,640.00

Jumlah Harga Bahan 8,530.00

Harga Alat:
76
Dump Truck jam 0.0080 450,000.00 3,600.00

Excavator jam 0.0138 862,000.00 11,895.60

Bulldozer jam 0.0098 878,000.00 8,604.40

Jumlah harga Alat 24,100.00

Jumlah Bahan, Tenaga & Alat 32,630.00

Biaya Umum & Keuntungan 10% 3,263.00

Dibulatkan 35,893

Pengukuran dan Positioning

Upah tenaga:
Juru Ukur/Surveyor 4 OH 60.0000 180,000.00 10,800,000.00

Pekerja 4 OH 60.0000 100,000.00 6,000,000.00

HARGA SATUAN PEKERJAAN (HSP) -96


77
HARGA SAT. DASAR
NO URAIAN SAT KUANTI TAS SUB TOTAL (Rp) HSP (Rp)
(Rp)
1 2 3 4 5 6 7

Jumlah Upah Tenaga 16,800,000.00

Harga Alat:
77 Total Station 2 Unit/hari 60.0000 250,000.00 15,000,000.00

Water Pass 2 Unit/hari 60.0000 250,000.00 15,000,000.00

Jumlah harga Alat 30,000,000.00


Jumlah Bahan, Tenaga & Alat 46,800,000.00

Biaya Umum & Keuntungan 10% 4,680,000.00

Dibulatkan 51,480,000

Mobilisasi dan Demobilisasi Peralatan


Harga Alat:

Pontoon Langsir jam 167.0000 1,445,000.00 241,315,000.00


Wheel Crane jam 167.0000 1,320,500.00 220,523,500.00

Diesel Hammer D46 jam 167.0000 168,200.00 28,089,400.00

Concrete pump jam 167.0000 247,371.00 41,310,957.00


Concrete Mixer jam 167.0000 160,000.00 26,720,000.00

Dump Truck jam 167.0000 450,000.00 75,150,000.00


Excavator jam 167.0000 456,300.00 76,202,100.00

78 Vibro Roller jam 167.0000 468,000.00 78,156,000.00

Bulldozer jam 167.0000 878,000.00 146,626,000.00


Water Tanker jam 167.0000 287,918.00 48,082,306.00

Wheel Roller jam 167.0000 332,800.00 55,577,600.00


Motor Grader jam 167.0000 950,000.00 158,650,000.00

Tandem Roller jam 167.0000 390,000.00 65,130,000.00

Jumlah harga Alat 1,261,532,863.00


Jumlah Bahan, Tenaga & Alat 1,261,532,863.00

Biaya Umum & Keuntungan 10% 126,153,286.30


Dibulatkan 1,387,686,149

Keselamatan Kerja

Harga Alat:

Peralatan PPPK set 3.0000 700,000.00 2,100,000.00


Tenda untuk Atisipasi Hujan ls 1.0000 400,000.00 400,000.00

Safty Helm bh 28.0000 69,700.00 1,951,600.00


Safty Shoes bh 28.0000 627,300.00 17,564,400.00

79 Safty Glass bh 28.0000 54,200.00 1,517,600.00

Hearing Protection bh 28.0000 205,700.00 5,759,600.00

Life Jacket bh 28.0000 327,000.00 9,156,000.00

Jumlah harga Alat 38,449,200.00


Jumlah Bahan, Tenaga & Alat 38,449,200.00

Biaya Umum & Keuntungan 10% 3,844,920.00


Dibulatkan 42,294,120

Pelaporan dan Dokumentasi

Harga Perlengkapan:

Biaya ATK
ATK bln 12.000 100,000.00 1,200,000.00

Biaya Sewa Komputer & Printer

Sewa Komputer dan Printer unit/bulan 12.000 2,500,000.00 30,000,000.00

Biaya Sewa Furniture Kantor

Sewa Meja dan kursi kerja set/bulan 12.000 1,750,000.00 21,000,000.00

Sewa Meja dan kursi rapat set/bulan 12.000 2,500,000.00 30,000,000.00

Sewa AC set/bulan 12.000 600,000.00 7,200,000.00

Sewa Filling cabinet set/bulan 12.000 250,000.00 3,000,000.00

Sewa White board set/bulan 12.000 100,000.00 1,200,000.00

80

HARGA SATUAN PEKERJAAN (HSP) -97


HARGA SAT. DASAR
NO URAIAN SAT KUANTI TAS SUB TOTAL (Rp) HSP (Rp)
(Rp)
1 2 3 4 5 6 7

80 Biaya Komunikasi

Biaya Komunikasi Lapangan bulan 12.000 500,000.00 6,000,000.00

Biaya Pelaporan
Album Foto eksemplar 1.000 100,000.00 100,000.00

As Built Drawing eksemplar 52.143 300,000.00 15,642,857.14

Laporan Bulanan eksemplar 12.000 100,000.00 1,200,000.00

Laporan Harian eksemplar 365.000 100,000.00 36,500,000.00

Laporan Mingguan eksemplar 52.143 100,000.00 5,214,285.71

Sekertaris ob 12.000 1,280,000.00 15,360,000.00

Jumlah Harga Bahan 173,617,142.86


Jumlah 173,617,142.86

Biaya Umum & Keuntungan 10% 17,361,714.29


Dibulatkan 190,978,857

Pintu (900x2600mm) Alumunium + Kaca

Harga bahan:
Profil Aluminium 4" m' 7 225,000.00 1,575,000.00

Multiplek lbr 3.400 190,000.00 646,000.00


Kisi-kis Kaca Louver m³ 0.295 650,000.00 191,750.00

Kunci Tanam Biasa bh 1.000 90,000.00 90,000.00

Paku Biasa kg 0.100 25,000.00 2,500.00

Engsel pintu kuningan/stainless bh 3.000 30,000.00 90,000.00

Handle Pintu stainlist bh 1.000 165,000.00 165,000.00


81
Jumlah Harga Bahan 2,760,250.00

Upah tenaga:
Pekerja OH 0.300 100,000.00 30,000.00

Tukang kayu OH 1.300 150,000.00 195,000.00


Kepala Tukang OH 0.1300 180,000.00 23,400.00

Mandor OH 0.0130 200,000.00 2,600.00

Jumlah Upah Tenaga 251,000.00

Jumlah Bahan, Tenaga & Alat 3,011,250.00

Biaya Umum & Keuntungan 10% 301,125.00


Dibulatkan 3,312,375

Pintu (2763x1325)mm Alumunium + Multi Lapis HPL+ Kaca

Harga bahan:

Profil Aluminium 4" m' 6.608 225,000.00 1,486,800.00


Multiplek lbr 2.515 190,000.00 477,920.08

Kisi-kis Kaca Louver m³ 0.295 650,000.00 191,750.00


Kunci Tanam Biasa bh 1.000 90,000.00 90,000.00

Paku Biasa kg 0.100 25,000.00 2,500.00

Engsel pintu kuningan/stainless bh 3.000 30,000.00 90,000.00

Kaca 5mm m³ 0.508 218,000.00 110,746.73

82 Handle Pintu stainlist bh 1.000 165,000.00 165,000.00


Jumlah Harga Bahan 2,614,716.81

Upah tenaga:
Pekerja OH 0.300 100,000.00 30,000.00

Tukang kayu OH 1.300 150,000.00 195,000.00

Kepala Tukang OH 0.1300 180,000.00 23,400.00

Mandor OH 0.0130 200,000.00 2,600.00

Jumlah Upah Tenaga 251,000.00


Jumlah Bahan, Tenaga & Alat 2,865,716.81

Biaya Umum & Keuntungan 10% 286,571.68


Dibulatkan 3,152,288

Pintu (1800x2600 mm) Alumunium + Kaca

HARGA SATUAN PEKERJAAN (HSP) -98


HARGA SAT. DASAR
NO URAIAN SAT KUANTI TAS SUB TOTAL (Rp) HSP (Rp)
(Rp)
1 2 3 4 5 6 7

Harga bahan:

Profil Aluminium 4" m' 9.16 225,000.00 2,061,000.00


Kisi-kisiKaca Louver m³ 0.604 650,000.00 392,600.00

Kaca 5 mm m2 2.840 218,000.00 619,120.00

Kunci Tanam Biasa bh 2.000 90,000.00 180,000.00

Paku Biasa kg 0.100 25,000.00 2,500.00

Rel Pintu Dorong bh 2.000 279,392.00 558,784.00

Engsel pintu kuningan/stainless bh 1.000 18,000.00 18,000.00


83 Handle Pintu stainlist bh 1.000 10,689.66 10,689.66

Jumlah Harga Bahan 3,842,693.66

Upah tenaga:
Pekerja OH 0.300 100,000.00 30,000.00

Tukang kayu OH 1.300 150,000.00 195,000.00


Kepala Tukang OH 0.1300 180,000.00 23,400.00

Mandor OH 0.0130 200,000.00 2,600.00


Jumlah Upah Tenaga 251,000.00

Jumlah Bahan, Tenaga & Alat 4,093,693.66

Biaya Umum & Keuntungan 10% 409,369.37


Dibulatkan 4,503,063

Pintu (2200x2600mm) Alumunium + Kaca

Harga bahan:

Profil Aluminium 4" m' 10.04 225,000.00 2,259,000.00

Kisi-kisiKaca Louver m³ 0.604 650,000.00 392,600.00


Multiplek lbr 3.710 150,000.00 556,500.00

Kunic Tanam Biasa bh 2.000 90,000.00 180,000.00

Paku Biasa kg 0.100 25,000.00 2,500.00

Engsel pintu kuningan/stainless bh 6.000 30,000.00 180,000.00


Handle Pintu stainlist bh 2.000 165,000.00 330,000.00
84
Jumlah Harga Bahan 3,900,600.00
Upah tenaga:

Pekerja OH 0.300 100,000.00 30,000.00

Tukang kayu OH 1.300 150,000.00 195,000.00

Kepala Tukang OH 0.1300 180,000.00 23,400.00

Mandor OH 0.0130 200,000.00 2,600.00


Jumlah Upah Tenaga 251,000.00

Jumlah Bahan, Tenaga & Alat 4,151,600.00


Biaya Umum & Keuntungan 10% 415,160.00

Dibulatkan 4,566,760

Pintu (2200x2980mm) Alumunium + Kaca

Harga bahan:
Profil Aluminium 4" m' 11.02 225,000.00 2,479,500.00

kaca 5mm m³ 1.539 218,000.00 335,545.60


Multiplek lbr 5.213 150,000.00 781,967.21

Kunic Tanam Biasa bh 2.000 90,000.00 180,000.00

Paku Biasa kg 0.100 25,000.00 2,500.00

Engsel pintu kuningan/stainless bh 6.000 30,000.00 180,000.00

Handle Pintu stainlist bh 2.000 165,000.00 330,000.00


85
Jumlah Harga Bahan 4,289,512.81

Upah tenaga:

Pekerja OH 0.300 100,000.00 30,000.00

Tukang kayu OH 1.300 150,000.00 195,000.00

Kepala Tukang OH 0.1300 180,000.00 23,400.00


Mandor OH 0.0130 200,000.00 2,600.00

Jumlah Upah Tenaga 251,000.00


Jumlah Bahan, Tenaga & Alat 4,540,512.81

Biaya Umum & Keuntungan 10% 454,051.28


Dibulatkan 4,994,564

PJ (2525x2200mm) Alumunium + Kayu Double + Kaca

HARGA SATUAN PEKERJAAN (HSP) -99


HARGA SAT. DASAR
NO URAIAN SAT KUANTI TAS SUB TOTAL (Rp) HSP (Rp)
(Rp)
1 2 3 4 5 6 7

Harga bahan:

Profil Aluminium 4" m' 15.963 225,000.00 3,591,675.00


kaca 5mm m³ 3.339 218,000.00 727,980.48

Multiplek lbr 2.066 150,000.00 309,836.07

Kunic Tanam Biasa bh 1.000 90,000.00 90,000.00

Paku Biasa kg 0.100 25,000.00 2,500.00

Engsel pintu kuningan/stainless bh 3.000 30,000.00 90,000.00

Handle Pintu stainlist bh 2.000 165,000.00 330,000.00


86 Jumlah Harga Bahan 5,141,991.55

Upah tenaga:

Pekerja OH 0.300 100,000.00 30,000.00


Tukang kayu OH 1.300 150,000.00 195,000.00

Kepala Tukang OH 0.1300 180,000.00 23,400.00


Mandor OH 0.0130 200,000.00 2,600.00

Jumlah Upah Tenaga 251,000.00


Jumlah Bahan, Tenaga & Alat 5,392,991.55

Biaya Umum & Keuntungan 10% 539,299.15

Dibulatkan 5,932,290

Pintu (700x2200mm) Alumunium


Harga bahan:

Profil Aluminium 4" m' 5.800 225,000.00 1,305,000.00


Pintu Kamar Mandi Alumunium bh 1.000 650,000.00 650,000.00

Jumlah Harga Bahan 1,955,000.00

Upah tenaga:
Pekerja OH 0.300 100,000 30,000.00
87
Tukang kayu OH 1.300 150,000.00 195,000.00
Kepala Tukang OH 0.1300 180,000.00 23,400.00

Mandor OH 0.0130 200,000.00 2,600.00


Jumlah Upah Tenaga 251,000.00

Jumlah Bahan, Tenaga & Alat 2,206,000.00


Biaya Umum & Keuntungan 10% 220,600.00

Dibulatkan 2,426,600

Jendela (4740x2502mm) Alumunium + Kaca

Harga bahan:

Profil Aluminium 4" m' 29.232 225,000.00 6,577,200.00


Kisi-kisiKaca Louver m³ 1.620 650,000.00 1,053,000.00

Kaca 5 mm m³ 9.090 218,000.00 1,981,620.00

Jumlah Harga Bahan 9,611,820.00


Upah tenaga:
88
Pekerja OH 0.300 100,000.00 30,000.00
Tukang kayu OH 1.300 150,000.00 195,000.00

Kepala Tukang OH 0.1300 180,000.00 23,400.00


Mandor OH 0.0130 200,000.00 2,600.00

Jumlah Upah Tenaga 251,000.00

Jumlah Bahan, Tenaga & Alat 9,862,820.00


Biaya Umum & Keuntungan 10% 986,282.00

Dibulatkan 10,849,102

Jendela (1700x1600mm) Alumunium + Kaca

Harga bahan:

Profil Aluminium 4" m' 9.9 225,000.00 2,227,500.00


Kisi-kisiKaca Louver m³ 0.568 650,000.00 369,200.00

Engsel Jendela bh 4.000 25,000.00 100,000.00


Kaca 5 mm m³ 1.272 218,000.00 277,296.00

Jumlah Harga Bahan 2,973,996.00


89 Upah tenaga:

Pekerja OH 0.300 100,000.00 30,000.00

HARGA SATUAN PEKERJAAN (HSP) -100


HARGA SAT. DASAR
NO
89 URAIAN SAT KUANTI TAS SUB TOTAL (Rp) HSP (Rp)
(Rp)
1 2 3 4 5 6 7

Tukang kayu OH 1.300 150,000.00 195,000.00

Kepala Tukang OH 0.1300 180,000.00 23,400.00


Mandor OH 0.0130 200,000.00 2,600.00

Jumlah Upah Tenaga 251,000.00

Jumlah Bahan, Tenaga & Alat 3,224,996.00

Biaya Umum & Keuntungan 10% 322,499.60


Dibulatkan 3,547,495

Jendela (1700x1600mm) Alumunium + Kaca + Void

Harga bahan:
Profil Aluminium 4" m' 9.9 225,000.00 2,227,500.00

Kisi-kisiKaca Louver m³ 0.568 650,000.00 369,200.00


Kaca 5 mm m³ 1.372 218,000.00 299,096.00

Jumlah Harga Bahan 2,895,796.00


Upah tenaga:
90
Pekerja OH 0.300 100,000.00 30,000.00

Tukang kayu OH 1.300 150,000.00 195,000.00


Kepala Tukang OH 0.1300 180,000.00 23,400.00

Mandor OH 0.0130 200,000.00 2,600.00


Jumlah Upah Tenaga 251,000.00

Jumlah Bahan, Tenaga & Alat 3,146,796.00


Biaya Umum & Keuntungan 10% 314,679.60

Dibulatkan 3,461,475

Jendela J4 (950x600mm) Alumunium + Kaca

Harga bahan:

Profil Aluminium 4" m' 3.100 225,000.00 697,500.00


Kaca 5 mm m³ 0.410 218,000.00 89,380.00

Jumlah Harga Bahan 786,880.00


Upah tenaga:

91 Pekerja OH 0.300 100,000.00 30,000.00

Tukang kayu OH 1.300 150,000.00 195,000.00

Kepala Tukang OH 0.1300 180,000.00 23,400.00

Mandor OH 0.0130 200,000.00 2,600.00


Jumlah Upah Tenaga 251,000.00

Jumlah Bahan, Tenaga & Alat 1,037,880.00


Biaya Umum & Keuntungan 10% 103,788.00

Dibulatkan 1,141,668

Jendela (870x600mm) Alumunium + Kaca

Harga bahan:
Profil Aluminium 4" m' 2.940 225,000.00 661,500.00

Kaca 5 mm m³ 0.410 218,000.00 89,380.00


Jumlah Harga Bahan 750,880.00

Upah tenaga:

92 Pekerja OH 0.300 100,000.00 30,000.00


Tukang kayu OH 1.300 150,000.00 195,000.00

Kepala Tukang OH 0.1300 180,000.00 23,400.00


Mandor OH 0.0130 200,000.00 2,600.00

Jumlah Upah Tenaga 251,000.00

Jumlah Bahan, Tenaga & Alat 1,001,880.00

Biaya Umum & Keuntungan 10% 100,188.00

Dibulatkan 1,102,068
JS1 (1000x3000mm) Alumunium + Kaca+ Ornamen

Harga bahan:

Profil Aluminium 4" m' 8.320 225,000.00 1,872,000.00


Kaca 5 mm m³ 3.326 218,000.00 725,155.20

Ornamen m³ 3.326 175,000.00 582,120.00

93 HARGA SATUAN PEKERJAAN (HSP) -101


HARGA SAT. DASAR
NO URAIAN SAT KUANTI TAS SUB TOTAL (Rp) HSP (Rp)
(Rp)
1 2 3 4 5 6 7

Jumlah Harga Bahan 3,179,275.20

Upah tenaga:
93
Pekerja OH 0.300 100,000.00 30,000.00

Tukang kayu OH 1.300 150,000.00 195,000.00

Kepala Tukang OH 0.1300 180,000.00 23,400.00

Mandor OH 0.0130 200,000.00 2,600.00


Jumlah Upah Tenaga 251,000.00

Jumlah Bahan, Tenaga & Alat 3,430,275.20


Biaya Umum & Keuntungan 10% 343,027.52

Dibulatkan 3,773,302

Jendela JS2 (1660x4430mm) Alumunium + Kaca+ Ornamen

Harga bahan:
Profil Aluminium 4" m' 12.180 225,000.00 2,740,500.00

Kaca 5 mm m³ 7.354 218,000.00 1,603,128.40


Ornamen m³ 7.354 175,000.00 1,286,915.00

Jumlah Harga Bahan 5,630,543.40

Upah tenaga:
94
Pekerja OH 0.300 100,000.00 30,000.00

Tukang kayu OH 1.300 150,000.00 195,000.00


Kepala Tukang OH 0.1300 180,000.00 23,400.00

Mandor OH 0.0130 200,000.00 2,600.00


Jumlah Upah Tenaga 251,000.00

Jumlah Bahan, Tenaga & Alat 5,881,543.40

Biaya Umum & Keuntungan 10% 588,154.34


Dibulatkan 6,469,697

Jendela (820 x 2200mm) Alumunium + Kaca

Harga bahan:
Profil Aluminium 4" m' 7.680 225,000.00 1,728,000.00

Kaca 5 mm m³ 1.804 218,000.00 393,272.00


Jumlah Harga Bahan 2,121,272.00

Upah tenaga:

95 Pekerja OH 0.300 100,000.00 30,000.00

Tukang kayu OH 1.300 150,000.00 195,000.00

Kepala Tukang OH 0.1300 180,000.00 23,400.00


Mandor OH 0.0130 200,000.00 2,600.00

Jumlah Upah Tenaga 251,000.00


Jumlah Bahan, Tenaga & Alat 2,372,272.00

Biaya Umum & Keuntungan 10% 237,227.20

Dibulatkan 2,609,499
Jendela J7 (1438X1819mm) Kayu Double Multi Lapis HPL + Kaca

Harga bahan:

Profil Aluminium 4" m' 7.924 225,000.00 1,782,900.00


Kaca 5 mm m³ 1.591 218,000.00 346,818.27 Engsel Jendela
Engsel Jendela bh 4.000 25000 100,000.00

Finishing Sticker Sandblast m³ 1.591 175,000.00 278,409.16


Jumlah Harga Bahan 2,508,127.43

96 Upah tenaga:
Pekerja OH 0.300 100,000.00 30,000.00

Tukang kayu OH 1.300 150,000.00 195,000.00

Kepala Tukang OH 0.1300 180,000.00 23,400.00

Mandor OH 0.0130 200,000.00 2,600.00

Jumlah Upah Tenaga 251,000.00


Jumlah Bahan, Tenaga & Alat 2,759,127.43

Biaya Umum & Keuntungan 10% 275,912.74


Dibulatkan 3,035,040

Jendela (745 x 2000mm) Alumunium + Kaca

Harga bahan:

HARGA SATUAN PEKERJAAN (HSP) -102


HARGA SAT. DASAR
NO URAIAN SAT KUANTI TAS SUB TOTAL (Rp) HSP (Rp)
(Rp)
1 2 3 4 5 6 7

Profil Aluminium 4" m' 5.490 225,000.00 1,235,250.00

Kisi-kisiKaca Louver m³ 1.490 650,000.00 968,500.00


Jumlah Harga Bahan 2,203,750.00

Upah tenaga:

97 Pekerja OH 0.300 100,000.00 30,000.00

Tukang kayu OH 1.300 150,000.00 195,000.00


Kepala Tukang OH 0.1300 180,000.00 23,400.00

Mandor OH 0.0130 200,000.00 2,600.00


Jumlah Upah Tenaga 251,000.00

Jumlah Bahan, Tenaga & Alat 2,454,750.00

Biaya Umum & Keuntungan 10% 245,475.00


Dibulatkan 2,700,225

Membuat 1 unit pintu stainless tebal 1,2 mm, rangka besi hollow

Harga bahan:

1 set kusen + pintu stainless 1 1.000 12,000,000.00 12,000,000.00

Jumlah Harga Bahan 12,000,000.00


Upah tenaga:

Pekerja OH 1.050 100,000.00 105,000.00


98
Tukang bes OH 1.050 150,000.00 157,500.00

Kepala Tukang OH 0.1050 180,000.00 18,900.00


Mandor OH 0.0520 200,000.00 10,400.00

Jumlah Upah Tenaga 291,800.00

Jumlah Bahan, Tenaga & Alat 12,291,800.00


Biaya Umum & Keuntungan 10% 1,229,180.00

Dibulatkan 13,520,980
Membuat 1 unit pintu stainless tebal 1,2 mm 4m x 4m rangka besi hollow

Harga bahan:

1 set kusen + pintu stainless 1 1.000 29,600,000.00 29,600,000.00


Jumlah Harga Bahan 29,600,000.00

Upah tenaga:

Pekerja OH 1.050 0.00 -


99
Tukang bes OH 1.050 100,000.00 105,000.00

Kepala Tukang OH 0.1050 150,000.00 15,750.00


Mandor OH 0.0520 180,000.00 9,360.00

Jumlah Upah Tenaga 130,110.00


Jumlah Bahan, Tenaga & Alat 29,730,110.00

Biaya Umum & Keuntungan 10% 2,973,011.00

Dibulatkan 32,703,121
1 set ventliasi jalusi

Harga bahan:

1 set ventilasi jalusi 1 1.000 2,000,000.00 2,000,000.00


Jumlah Harga Bahan 2,000,000.00

Upah tenaga:

Pekerja OH 1.050 100,000.00 105,000.00


100
Tukang bes OH 1.050 150,000.00 157,500.00

Kepala Tukang OH 0.1050 180,000.00 18,900.00


Mandor OH 0.0520 200,000.00 10,400.00

Jumlah Upah Tenaga 291,800.00

Jumlah Bahan, Tenaga & Alat 2,291,800.00

Biaya Umum & Keuntungan 10% 229,180.00

Dibulatkan 2,520,980
1m2 Pagar BRC Lengkap Dengan Tiang D6mm

Harga bahan:
BRC Lengkap Dengan tiang m2 1 175,893.500000 175,893.50
Semen Portand kg 2 1,600.000000 3,200.00
Pasir Beton m3 0.005 263,000.000000 1,315.00
Koral Beton 2/3 m3 0.009 268,900.00 2,420.10

HARGA SATUAN PEKERJAAN (HSP) -103


101
HARGA SAT. DASAR
NO URAIAN SAT KUANTI TAS SUB TOTAL (Rp) HSP (Rp)
(Rp)
1 2 3 4 5 6 7
Jumlah Harga Bahan 182,828.60

Upah tenaga:
101

Pekerja OH 0.375 100,000.00 37,500.00

Tukang bes OH 0.125 150,000.00 18,750.00


Kepala Tukang OH 0.0120 180,000.00 2,160.00

Mandor OH 0.0190 200,000.00 3,800.00


Jumlah Upah Tenaga 62,210.00

Jumlah Bahan, Tenaga & Alat 245,038.60


Biaya Umum & Keuntungan 10% 24,503.86

Dibulatkan 269,542
Pekerjaan Septic Tank 2 m3 (PM 78 2014)

Harga bahan:

- Material Instalasi Septic Tank m3 ls 1 8,050,000 8,050,000.00


Jumlah Harga Bahan 8,050,000.00

Upah tenaga:
- Pekerja OH 11 100,000 1,100,000.00

- Tukang OH 6 150,000 900,000.00


102.
- Mandor OH 3 200,000 600,000.00

Jumlah Upah Tenaga 2,600,000.00

Jumlah Bahan & Tenaga 10,650,000.00


Biaya Umum & Keuntungan 10% 1,065,000.00

Dibulatkan 11,715,000

Mengurug pasir urug tiap 1 m³ yang dipadatkan

Harga bahan:

- Pasir urug m³ 1.2 170,000 204,000.00


Jumlah Harga Bahan 204,000.00

Upah tenaga:
- Pekerja OH 0.3 100,000 30,000.00
103.
- Mandor OH 0.01 200,000 2,000.00
- Pemadatan sewa/hr 0.05 224,000 11,200.00

Jumlah Upah Tenaga 43,200.00

Jumlah Bahan & Tenaga 247,200.00

Biaya Umum & Keuntungan 10% 24,720.00

Dibulatkan 271,920

HARGA SATUAN PEKERJAAN (HSP) -104


1

DAFTAR HARGA MATERIAL


PEKERJAAN : RAB STRUKTUR
LOKASI : DERMAGA MOCO, TANJUNG PINANG
TAHUN ANGGARAN 2020

NO URAIAN SAT HARGA SATUAN (Rp) KET


###
I. HARGA BAHAN / MATERIAL
A PASIR, BATU DAN SEMEN ###
1. Pasir pasang m³ 198,000 Buku Jurnal Edisi 39 Tahun 2020
2. Pasir urug m³ 170,000 Buku Jurnal Edisi 39 Tahun 2020
3. Pasir beton m³ 263,000 Buku Jurnal Edisi 39 Tahun 2020###
4. Tanah urug m³ 45,320 Buku Jurnal Edisi 39 Tahun 2020###
5. Tanah Timbunan pilihan m³ 45,320 Buku Jurnal Edisi 39 Tahun 2020###
6. Sirtu m³ 267,000 Buku Jurnal Edisi 39 Tahun 2020###
7. Sirtu non quari m³ 230,000 Buku Jurnal Edisi 39 Tahun 2020###
8. Tanah merah m³ 187,000 Buku Jurnal Edisi 39 Tahun 2020
9. Abu batu m³ 268,900 Buku Jurnal Edisi 39 Tahun 2020###
10. Batu pecah 5/7 m³ 268,900 Buku Jurnal Edisi 39 Tahun 2020###
11. Batu pecah/split 3/4 m³ 268,900 Buku Jurnal Edisi 39 Tahun 2020###
12. Batu pecah/split 2/3 m³ 268,900 Buku Jurnal Edisi 39 Tahun 2020###
13. Batu pecah/split 1/2 m³ 268,900 Buku Jurnal Edisi 39 Tahun 2020###
14. Batu pecah/split 0,5/1 (screening) m³ 268,900 Buku Jurnal Edisi 39 Tahun 2020###
15. Batu kali m³ 268,900 Buku Jurnal Edisi 39 Tahun 2020###
16. Batu Bongkahan (170-230mm) m³ 650,000 Buku Jurnal Edisi 39 Tahun 2020###
17. Batu Bongkahan (100-170mm) m³ 650,000 Buku Jurnal Edisi 39 Tahun 2020###
18. Bata merah bh 2,500 Buku Jurnal Edisi 39 Tahun 2020###
19. Bata tela 7x14x28 cm bh 2,500 Buku Jurnal Edisi 39 Tahun 2020###
20. Roster beton kecil bh 20,000 Buku Jurnal Edisi 39 Tahun 2020###
21. Roster beton Sedang bh 41,700 Buku Jurnal Edisi 39 Tahun 2020###
22. Roster beton Besar bh 75,000 Buku Jurnal Edisi 39 Tahun 2020###
23. Paving Blok Balok/batu bata bh 168,000 Buku Jurnal Edisi 39 Tahun 2020###
24. Paving Blok segi enam kecil merah bh 153,600 Buku Jurnal Edisi 39 Tahun 2020###
25. Paving blok segi enam keci abu abu bh 120,000 Buku Jurnal Edisi 39 Tahun 2020###
26. Paving Blok segi enam besar merah bh 140,000 Buku Jurnal Edisi 39 Tahun 2020###
27. Paving blok segi enam Besar abu abu bh 140,000 Buku Jurnal Edisi 39 Tahun 2020###
28. Kanstin paving abu-abu (10x20x40) cm bh 168,000 Buku Jurnal Edisi 39 Tahun 2020###
29. Batu Alam m² 153,300 Buku Jurnal Edisi 39 Tahun 2020###
30. Batu palimanan m² 226,700 Buku Jurnal Edisi 39 Tahun 2020###
31. Batu Andesit m² 226,700 Buku Jurnal Edisi 39 Tahun 2020###
32. Batu garis m² 248,300 Buku Jurnal Edisi 39 Tahun 2020###
33. Batu tempel m² 83,333 Buku Jurnal Edisi 39 Tahun 2020###
34. Semen portland kg 1,600 Buku Jurnal Edisi 39 Tahun 2020###
35. Semen portland warna/ nat keramik kg 25,000 INDO MAS###
36. Semen Gresik 50 kg sak 77,000 ###
37. Semen Holcim 50 kg sak 79,000 ###
38. Semen Tonasa 50 kg sak 75,700 ###
39. Bata ringan (60x20x10) cm bh 15,000 ###
40. Bata ringan (60x20x7,5) cm bh 14,000 ###
41. MU-380 (Perekat Pas Bata Ringan) kg 4,688 ###
42. MU-301 (Plesteran) kg 1,800 ###
43. MU-200 (Acian) kg 6,000 ###
44. Batako bh 3,000
45. beton Decking bh 250
46. Beton Readymix mutu K-125 m3 1,105,500 ###
47. Beton Readymix mutu K-225 m3 1,188,000 ###
48. Beton Readymix mutu K-250 m3 1,250,000 ###
49. Beton Readymix mutu K-300 m3 1,282,000 ###
50. Beton Readymix mutu K-350 m3 1,355,000 ###
51. Beton Readymix mutu K-400 m3 1,500,000 ###
52. Waterprofing Crystaline kg 69,000 ###
53. Waterstop m1 235,200 ###
54. Sika Grout kg 6,600 ###
55. Penyemprotan Anti Rayap m2 27,500 ###
56. Tiang Pancang 25 x 25 panjang 6 meter m1 175,000 ###
###
I. HARGA BAHAN / MATERIAL
B BAHAN KAYU
1. Kayu kelas I 10 x 10 x 400 (kayu besi) m³ 4,000,000 ###
2. a m³ 4,000,000 ###
3. Kayu kelas I 6 x 12 x 400 (kayu besi) m³ 4,000,000 ###
4. Kayu kelas I 5 x 5 x 400 (kayu besi) m³ 4,000,000 ###
5. Kayu kelas I 2,5 x 25 x 400 (Papan kayu besi) m³ 4,200,000 ###
6. Kayu kelas I 3 x 30 x 400 (Papan kayu besi) m³ 4,200,000 ###
7. Kayu kelas II 5 x 10 x 400 (kayu matoa) m³ 2,700,000 ###
8. Kayu kelas II 5 x 5 x 400 (kayu matoa) m³ 2,700,000 ###
9. Kayu kelas III 5 x 10 x 400 (kayu lombo) m³ 2,200,000 ###
10. Kayu kelas III 5 x 5 x 400 (kayu lombo) m³ 2,200,000 ###
11. Kayu kelas III 2,5 x 25 x 400 (kayu lombo) m³ 2,200,000 ###
12. Kayu Dolken / mangi-mangi Ø 5-7 cm btng 57,500 ###
KAYU PUTIH /CAMPURAN ( untuk Bekisting)
13. Balok ukuran 5 x 10 m³ 2,500,000 ###
14. Balok ukuran 10 x 10 m³ 2,500,000 ###
15. Papan ukuran 2,5 x 20 m³ 2,500,000 ###

C KAYU LAPIS DAN LEMBARAN


1. Teakwood 3x7 ft 3 mm Lbr 103,000 ###
2. Teakwood 4x8 ft 3 mm Lbr 135,000 ###
3. Triplek 4x8 ft 3 mm Lbr 65,000 INDOMAS###
4. Triplek 4x8 ft 4 mm Lbr 85,000 INDOMAS###
5. Triplek 4x8 ft 5 mm Lbr 78,700 ###
6. Triplek 4x8 ft 6 mm Lbr 100,000 INDOMAS###
7. Triplek 4x8 ft 9 mm Lbr 150,000 INDOMAS###
8. Triplek 4x8 ft 12 mm Lbr 190,000 INDOMAS###
9. Gypsumboard (1200x2400x9) mm Lbr 120,000 ###
10. GRC-board (1200x2400x4) mm Lbr 86,000 ###
11. Calsiboard 120x240 cm 4 mm Lbr 127,500 ###
12. Sekrup gypsum bh 32,000 CIJ###
13. Textile tape 90m/rol 47,500
14. Compound 20kg/zak 82,500
15. List gypsum m1 50,000 ###
16. Paku peluru ramset bh 3,885 ###
17. Hollow 4x4 cm tbl 0.35 mm btng 37,500 ###
18. Hollow 2x4 cm tbl 0.35 mm btng 28,500 ###
19. Sekrup 6x1-1,5 bh 180 ###
20. Tako HPL warna kayu m2 117,769 ###

D LANTAI, PARTISI & RANGKA ATAP TERPASANG ###


1. Lantai Beton FLY SLAP m2 950,000 ###
2. Atap baja ringan (terpasang) m² 235,000 ###
3. Partisi Cubikal Toilet (terpasang) m² 1,950,000 ###

E BAHAN BESI
1. Besi beton polos kg 25,200 ###
2. Besi beton ulir kg 31,200 ###
3. Jaring kawat baja/wiremesh kg 13,369 ###
4. Kawat beton kg 28,200 ###
8. Besi pelat strip kg 42,900
9. Besi segi empat 3/8"x3/8" (0,83kg/m') kg 15,400
10. Besi baja I/WF kg 15,400
11. Besi baja profil kg 40,200 ###
12. Besi siku L 30.30.3 kg 24,200
Besi siku L 40.40.3 kg 27,400
13. Besi plat hitam (mild steel plate) 2 mm kg 15,400 ###
14. Kawat las kg 41,600 ###
15. Profil aluminium 3" m' 180,000 ###
16. Profil aluminium 4" m' 225,000 ###
17. Aluminium strip m' 48,200
18. Angkur M10 bh 32,100 ###
19. Angkur M20 bh 45,000 ###
20. Hollow Besi 40x20 btng 205,710 2.3mm
21. Hollow Besi 50x50 btng 322,242 3mm
22. Hollow Besi 50x100 btng 609,690 ###
23. Hollow Besi 60x30 btng 218,925 1,7mm
24. Hollow Besi 60x60 btng 392,550 3mm

Harga Bahan Upah -2


###
I. HARGA BAHAN / MATERIAL
25. Hollow Besi 100x100 btng 693,000 3.2mm
26. List alumunium U Chanel m1 15,000
27. List Profil m1 18,000
Pagar BRC dengan tiang D6mm m2 175,894 https://pagarbrc.madaniah.co.id/daftar-harga-pag
Alumunium Compsite m2 425,000
Hollow Besi Galvanis 4x4x 1mm btg 115,000
Braket siku btg 60,000
Paku skrup beton kg

F BAHAN KERAMIK DAN PENUTUP LAIN


1. Keramik Lantai 80 x 80 bh 261,120 Rezeki Lancar Abadi###
2. Keramik 60 x 60 polos bh 46,800 Rezeki Lancar Abadi###
3. Keramik 60 x 60 warna bh 50,400 Rezeki Lancar Abadi###
4. Keramik 50 x 50 (agatha) bh 22,250 Rezeki Lancar Abadi###
5. Keramik 50 x 50 (roman) bh 27,000 Rezeki Lancar Abadi###
6. Keramik 40 x 40 (JTS) bh 12,800 INDO MAS###
7. Keramik 40 x 40 (Mulia) bh 14,400 INDO MAS###
8. Keramik 25 x 40 (Diamond) bh 7,500 INDO MAS###
9. Keramik 25 x 25 (Diamond) bh 4,375 INDO MAS###
10. Keramik 20 x 40 (JTS) bh 6,400 INDO MAS###
11. Granito Biasa 60 x 60 cm bh 108,500 ###
12. Granito KW1 60 x 60 cm bh 125,650 ###
13. Marmer putih 40 x 60 cm bh 95,550 ###
14. Marmer putih 40 x 60 cm bh 101,850 ###
15. Ubin keramik 40 x 40 cm Roman bh 30,000 ###
16. Ubin keramik 30 x 30 cm Roman bh 12,409 ###
17. Ubin keramik 20 x 20 cm Roman bh 6,000 ###
18. Ubin keramik 20 x 25 cm Roman bh 7,013 ###
16. Keramik Dinding 30 x 30 cm Roman bh 19,773 ###
19. Ubin keramik 10 x 20 cm Roman bh 3,500
20. Ubin keramik 5 x 20 cm Roman bh 3,250
21. Stepnozing 10 x 60 cm bh 49,500 ###
22. Floor hardener kg 86,250 ###
23. Dinding Granite 60 x 60 hitam m2 870,000 ###

G BAHAN PENUTUP ATAP


1. Seng gelombang 3x6 ft BJLS 30 (0,3 mm) Lbr 69,300 ###
2. Seng gelombang 3x7 ft BJLS 30 (0,3 mm) Lbr 80,300 ###
3. Seng gelombang 3x8 ft BJLS 30 (0,3 mm) Lbr 92,400 ###
4. Seng gelombang 3x6 ft BJLS 20 (0,2 mm) Lbr 47,300 ###
5. Seng gelombang 3x7 ft BJLS 20 (0,2 mm) Lbr 56,100 ###
6. Seng gelombang 3x8 ft BJLS 20 (0,2 mm) Lbr 63,800 ###
7. Seng Multiroof Sakura Roof 0,2 Lbr 49,500 ###
8. Seng plat 3x6 ft BJLS 30 (0,3 mm) Lbr 40,100
9. Atap Spandek Lbr 160,000 Cahaya Indah Jaya###
10. Nok Atap Lbr 38,500 ###
11. Atap Onduline 200 x 95 cm Lbr 198,000 ###
12. Atap Onduline 106 x 40 cm Lbr 102,300 ###
13. Atap Onduline 100 x 50 cm Lbr 33,000 ###
14. Atap Fiber Glass transparan lbr 207,000 ###
15. Genteng metal m² 38,000
16. Nok genteng metal bh 28,000
17. Aluminium foil m² 8,500 ###
18. Roofmesh m2 10,986 ###
19. Lisplank GRC 10 x 30 m1 49,000 ###
20. Glass Woll T= 2" density 24 m2 17,917 ###
Lisplank Kayu Jati m' 125,000
H BAHAN CAT KAYU DAN TEMBOK
1. Dempul kayu Arsego kg 20,000 Cahaya Indah Jaya###
2. Plamir kayu kg 44,000 ###
3. Plamir tembok kg 52,800 ###
4. Cat tembok setara Catylac kg 33,000 INDO MAS###
5. Cat tembok setara JOTUN Interior kg 72,000 INDO MAS###
6. Cat tembok setara JOTUN kg 118,800 ###
7. Cat tembok Dulux/ICI kg 88,200 ###
8. Cat tembok Dulux/ICI Weathershield kg 120,000 ###
9. Cat meni kayu kg 26,000 INDO MAS###
10. Cat meni besi kg 37,000 INDO MAS###

Harga Bahan Upah -3


###
I. HARGA BAHAN / MATERIAL
11. Cat kayu kg 37,000 INDO MAS###
12. Cat zinchromate kg 37,000 INDO MAS###
13. Wood filler Ultran kg 85,909 ###
14. Minyak cat/tiner Ltr 33,000 ###
15. Politur jadi Ltr 66,700 ###
16. Vernis Ltr 58,500 ###
17. Residu Ltr 15,000 ###
18. Amplas Lbr 7,000 INDO MAS###
19. Kapi bh 20,000 INDO MAS
20. Kuas Biasa 2'' bh 10,000 INDO MAS###
21. Kuas Biasa 3'' bh 15,000 INDO MAS###
22. Kuas roll bh 45,000 INDO MAS###
23. Ijuk kg 21,122
24. Lem kayu fox Ltr 27,500 ###
25. Waterproofing coating kg 56,000 ###
26. Cat Melamik m2 250,000
###

I PAKU
1. Paku biasa 2"-5" kg 15,000 INDO MAS###
2. Paku biasa 1/2"- 1" kg 25,000 INDO MAS###
3. Paku sekrup 3,5" bh 15,000 ###
4. Sekrup kg 45,000
5. Paku beton kg 35,700 ###
6. Paku seng kg 25,000
J BAHAN KACA
1. Jendela nako (rangka) daun 147,000 ###
2. Kaca 3 mm m² 173,000 ###
3. Kaca 5 mm m² 218,000 ###
4. Kaca 10 mm m² 212,000 ###
5. Kaca Tempered 12 mm m² 833,000 ###
6. Kaca raiben 5 mm m² 210,000 ###
7. Kaca raiben 10 mm m² 241,000 ###
9. Sealant jendela kaca tube 52,500 ###
Cermin tebal 5mm m2 130,000 JAYA KERAMIK
K BAHAN SANITASI
1. Kloset duduk setara Toto (tdk sederhana) Toto CW633 bh 1,450,000 Rezeki Lancar Abadi###
2. Wastafel Toto LW246 bh 430,000 Rezeki Lancar Abadi###
3. Jet Washer Toto THX20NB bh 245,000 Rezeki Lancar Abadi###
4. Floor drain stainless Toto TXIEB bh 330,000 Rezeki Lancar Abadi###
5. Seal tape bh 3,000 Rezeki Lancar Abadi###
6. Kran air stainless bh 105,000 Rezeki Lancar Abadi###
7. Klosed duduk (CW 420J-SW420JP) bh 1,888,000 Rezeki Lancar Abadi###
8. Wastafel (LW 568 B) bh 555,000 Rezeki Lancar Abadi###
9. Wastafel Gantung (LW 247) bh 605,000 Rezeki Lancar Abadi###
10. Kran bh 40,000 INDO MAS###
11. Shower Spreay (THX 20 NB) bh 245,000 Rezeki Lancar Abadi###
12. Shower Bath (TX 474 SP) bh 1,408,000 Rezeki Lancar Abadi###
13. Urinoir ( U 57 WW) bh 1,885,000 Rezeki Lancar Abadi###
14. Sekat Urinoir ( A 100) bh 1,200,000 Surya Jaya Keramik###
15. Tempat Tissue Emponim 81013 bh 175,000 Rezeki Lancar Abadi###
16. Tempat Sabun Emponim bh 207,000 Rezeki Lancar Abadi###
17. Cermin bh 210,000 ###
18. Toto Floor Drain TX1EB bh 330,000 Rezeki Lancar Abadi###
19. Sealant tube 52,500 Rezeki Lancar Abadi###
Sink Emporium 1 800,000 Rezeki Lancar Abadi
L BAHAN KUCI DAN ALAT PENGGANTUNG
1. Kunci tanam sederhana bh 58,000
2. Kunci tanam biasa bh 90,000 INDO MAS
3. Kunci tanam antik bh 331,641
4. Kunci tanam KM bh 150,000 INDO MAS
5. Kunci silinder bh 45,000 INDO MAS
6. Engsel pintu biasa/sederhana bh 18,000 INDO MAS
7. Engsel pintu kuningan/stainless bh 30,000 INDO MAS
8. Engsel jendela bh 25,000 INDO MAS
9. Engsel angin bh 24,000
11. Kait angin bh 22,522
12. Door closer bh 352,000

Harga Bahan Upah -4


###
I. HARGA BAHAN / MATERIAL
13. Kunci selot bh 64,900
14. Pintu Aluminium + kaca m² 1,587,302 ###
15. Jendela Aluminium + Kaca m² 989,583 ###
16. Door holder bh 60,900
17. Door stop bh 53,100
18. Rel pintu dorong bh 279,392
19. Engsel Pintu dorma bh 2,250,000
20. Handle Pintu stainlist set 165,000
21. Dust Proof m1 12,500
22. Portal acp rangka baja ls 3,500,000

M BAHAN PIPA
1. Pipa galvanis dia 1/2" m' 35,000 INDO MAS
2. Pipa galvanis dia 3/4" m' 43,750 INDO MAS
3. Pipa galvanis dia 1" m' 68,750 INDO MAS
4. Pipa galvanis dia 1 ¼" m' 87,500 INDO MAS
5. Pipa galvanis dia 1 ½" m' 105,000 INDO MAS
6. Pipa galvanis dia 2" m' 363,574
7. Pipa galvanis hitam dia 2" untuk pagar m' 239,575
8. Pipa galvanis dia 2 ½" m' 187,500 INDO MAS
9. Pipa galvanis dia 3" m' 245,000 INDO MAS
10. Pipa galvanis dia 4" m' 387,500 INDO MAS
10. Pipa gip medium class 8" m' 1,375,000
11. Pipa PVC dia 1/2" AW m' 6,034 Rezeki Lancar Abadi
12. Pipa PVC dia 3/4" AW m' 8,000 Rezeki Lancar Abadi
13. Pipa PVC dia 1" AW m' 11,000 Rezeki Lancar Abadi
14. Pipa PVC dia 1 ¼" AW m' 16,897 Rezeki Lancar Abadi
15. Pipa PVC dia 1 ¼" D m' 10,690 Rezeki Lancar Abadi
16. Pipa PVC dia 1 ½" AW m' 19,310 Rezeki Lancar Abadi
17. Pipa PVC dia 1 ½" D m' 11,897 Rezeki Lancar Abadi
18. Pipa PVC dia 2" AW m' 24,655 Rezeki Lancar Abadi
19. Pipa PVC dia 2" D m' 15,345 Rezeki Lancar Abadi
20. Pipa PVC dia 2 ½" AW m' 36,034 Rezeki Lancar Abadi
21. Pipa PVC dia 2 ½" D m' 20,690 Rezeki Lancar Abadi
22. Pipa PVC dia 3" AW m' 50,690 Rezeki Lancar Abadi
23. Pipa PVC dia 3" D m' 27,414 Rezeki Lancar Abadi
24. Pipa PVC dia 4" AW m' 83,793 Rezeki Lancar Abadi
25. Pipa PVC dia 4" D m' 43,103 Rezeki Lancar Abadi
26. Pipa PVC dia 6" AW m' 186,379 Rezeki Lancar Abadi
27. uditch 500x500 panj. 120 cm bh 750,000
28. uditch 400x400 panj. 120 cm bh 498,000
29. uditch 300x400 panj. 120 cm bh 445,200
30. Box Culvert 30 x 40 x 120 cm bh 475,000 ###
31. Tutup Uditch 500x500 panj. 120 cm bh 247,200
32. Tutup uditch 400x400 panj. 120 cm bh 187,200
33. Tutup uditch 300x400 panj. 120 cm bh 123,600
STP
30. Septic tank biofil 8 m3 unit 49,250,000
31. Septic tank biofil 1 m3 unit 9,300,000
32. Septic tank biofil 3 m3 unit 28,800,000
33. Sumur resapan unit 16,000,000

AIR CONDISIONER & FAN (tata udara)


1. AC split cap 1/2 PK bh 4,445,000
2. AC split cap 1 PK bh 5,736,000
3. AC split cap 1 1/2 PK bh 6,727,200
4. AC split cap 2 PK bh 7,842,300
5. AC 3 PK Caesette bh 19,367,500
6. AC 5 PK Caesette bh 34,537,700
7. AC SPLIT Duct 200.000 Btuh bh 220,000,000
8. Filter viledone bh 792,000
9. Thermostat bh 2,200,000
10. Fiting AC Split Duct bh 9,680,000
11. Connecting AC Split duct bh 2,640,000
12. Support & Pondasi Ac Split Duct bh 2,024,000
13. Bracket AC bh 132,000
14. Bracket AC kecil bh 132,000
15. Dreyer ls 748,000

Harga Bahan Upah -5


###
I. HARGA BAHAN / MATERIAL
16. valve ls 308,000
17. sight glass bh 369,000
18. freon ls 2,376,000
19. Pipa refrigerant 1/4" + 3/8 " isolasi m' 85,000
20. Pipa tembaga dia. 1/2" + 1/4 " isolasi m' 99,000
21. Pipa tembaga dia. 3/8" + 5/8" isolasi m' 144,000
22. Pipa tembaga dia. 3/8" + 3/4" isolasi m' 179,000
23. Pipa refrigerant 1 1/8 " isolasi 267,000
24. Pipa tembaga dia. 5/8" isolasi 93,000
25. insuflex 3/4" (19.1 mm) m' 13,000
26. insuflex 1" (25.4 mm) m' 23,000
27. insuflex 1.5" (38.1 mm) m' 44,000
28. Isolasi tape 2" roll 12,000
29. VINYL TAPE ADHESIVE roll 17,000
30. CEILLING siroco fan 100 cmh , 24CDF bh 2,728,000

ELBOW & SOCK PIPA


1. elbow pvc 1/2" bh 3,000 Rezeki Lancar Abadi
2. elbow pvc 3/4" bh 3,000 Rezeki Lancar Abadi
3. elbow pvc 1" bh 5,000 Rezeki Lancar Abadi
4. elbow pvc 11/4" bh 8,000 Rezeki Lancar Abadi
5. elbow pvc 11/2" bh 11,000 Rezeki Lancar Abadi
6. elbow pvc 2" bh 16,000 Rezeki Lancar Abadi
7. elbow pvc 3" bh 42,000 Rezeki Lancar Abadi
8. elbow pvc 4" bh 78,000 Rezeki Lancar Abadi
9. elbow pvc 6" bh 195,000 Rezeki Lancar Abadi
10. sock pipa pvc 1/2" bh 2,000 Rezeki Lancar Abadi
11. sock pipa pvc 3/4" bh 3,000 Rezeki Lancar Abadi
12. sock pipa pvc 1" bh 4,000 Rezeki Lancar Abadi
13. sock pipa pvc 1 1/4" bh 6,000 Rezeki Lancar Abadi
14. sock pipa pvc 1 1/2" bh 9,000 Rezeki Lancar Abadi
15. sock pipa pvc 2" bh 13,000 Rezeki Lancar Abadi
16. sock pipa pvc 3" bh 29,000 Rezeki Lancar Abadi
17. sock pipa pvc 4" bh 63,000 Rezeki Lancar Abadi
18. sock pipa pvc 6" bh 131,000 Rezeki Lancar Abadi
PIPA GIP MEDIUM
19. pipa gip medium class 3/4" m' 449,000
20. pipa gip medium class 4" m' 2,042,000
PIPA BSP CLASS
21. Flange 8 " bh 328,000
22. Flange buta 8 " bh 522,000
SOCK PIPA GIP
23. sock pipa gip 4" bh 249,000
24. spit tembaga 1" bh 311,000
25. GROUND ROD DRILLING HEAD dia. 5/8" 89,000
26. Copper Rod , Dia 5/ 8 " , panjang 3 meter 108,000
27. lem pvc tube 30,000
28. seal tape m' 6,000
29. Lem besi tube 390,000
GATE VALVE
30. gate valve dia 1 " bh 362,000
31. gate valve dia 1 1/4" bh 541,000
32. gate valve dia 2 " bh 1,578,000
33. gate valve dia 1 " Bronze bh 365,000
34. gate valve dia 2 " Bronze bh 850,000
35. gate valve dia 2 " 16K bh 1,435,000
36. gate valve dia 3" bh 105,000
37. gate valve dia 4" 16 K bh 2,850,000
CHECK VALVE
38. Check valve dia 2" 16 K bh 1,630,000
39. Strainer dia 3" bh 1,425,000
40. Foot valve dia 2" (50 mm) bh 595,000
41. Foot valve dia 3" (80 mm) bh 605,000
42. Clean out 3" Stailess bh 364,000
43. Clean out 4" Stainless bh 408,000
44. Floating valve dia. 2" bh 850,000
45. Flexible connection 100 mm bh 875,000
46. Flexible connection 150 mm bh 1,905,000

Harga Bahan Upah -6


###
I. HARGA BAHAN / MATERIAL
44. Y 45 / 3" 89,000
45. Y 45 / 4" 74,000
46. radar bh 115,000
47. Fire extinguisher Type ABC kap 3 kg bh 1,244,000
POMPA - POMPA
48. pompa summersible 1,5 PK pk bh 17,800,000
49. pompa transfer 200 lpm - head 40 m bh 20,240,000
50. pompa transfer 1000 lpm - head 75 m bh 79,240,000
51. Pressure Tank 1.000 Lt bh 65,240,000
52. Pompa mini booster kapasitas 100 lpm bh 89,200,000
53. Pompa Booster bh 38,200,000 INDO MAS
54. klem kabel bh 549
55. pipa conduit dia 20 mm bh 6,000
56. sock dia.20 mm bh 2,166
57. t dus dia. 20 mm bh 10,000
58. one way doos bh 10,000
59. klem dia.20 mm bh 1,500
60. flexible pipa m 1,813
61. Isolasi bh 20,000
62. inbouw doos bh 1,421
63. Lastdop bh 2,010
64. Elbow bh 3,269
65. Elbow ega bh 1,950
TANGKI TORN
66. tangki air kap 5.000 ltr pinguin bh 9,212,000

N BAHAN INSTALASI LISTRIK


KABEL - KABEL
1. kabel NYM 4 x 4 mm² m' 51,000
2. kabel NYM 4 x 2.5 mm² m' 39,000
3. Kabel NYM 3x4 mm² m' 34,195
4. Kabel NYM 3x2,5 mm² m' 15,069
5. Kabel NYM 2x2,5 mm² m' 12,000
6. Kabel NYM 2x1,5 mm² m' 8,191
7. Kabel NYR/FGbY 3 X 1.5 m' 33,095
8. Kabel NYR/FGbY 3 X 2.5 m' 38,071
9. Kabel NYR/FGbY 3 X 4 m' 50,834
10. Kabel NYR/FGbY 3 X 6 m' 59,423
11. Kabel NYR/FGbY 3 X 10 m' 75,734
12. Kabel NYR/FGbY 3 X 16 m' 91,343
13. Kabel NYR/FGbY 3 X 25 m' 222,183
14. Kabel NYR/FGbY 3 X 35 m' 261,769
15. Kabel NYR/FGbY 3 X 50 m' 304,589
16. Kabel NYY 3 X 1.5 m' 22,734
17. Kabel NYY 3 X 2.5 m' 28,573
18. Kabel NYY 3 X 4 m' 38,379
19. Kabel NYY 3 X 6 m' 39,720
20. Kabel NYY 3 X 10 m' 96,505
21. Kabel NYY 3 X 16 m' 126,000
22. Kabel NYY 3 X 25 m' 198,000
23. Kabel NYY 3 X 35 m' 261,000
24. Kabel NYY 3 X 50 m' 319,000
25. Kabel NYY 3 X 70 m' 409,282
26. Kabel NYY 3 X 95 m' 504,941
27. Kabel NYR/FGbY 4 X 1.5 m' 38,447
28. Kabel NYR/FGbY 4 X 2.5 m' 47,596
29. Kabel NYR/FGbY 4 X 4 m' 61,320
30. Kabel NYR/FGbY 4 X 6 m' 75,981
31. Kabel NYR/FGbY 4 X 10 m' 97,983
32. Kabel NYR/FGbY 4 X 16 m' 220,097
33. Kabel NYR/FGbY 4 X 50 m' 620,000
34. Kabel NYR/FGbY 4 X 70 m' 744,000
35. kabel NYFGBY 4 x 120 mm² m' 2,020,000
36. Kabel NYR/FGbY 4 X 300 m' 2,920,000
37. Kabel NYY 4 X 1.5 m' 26,497
38. Kabel NYY 4 X 2.5 m' 34,615
39. Kabel NYY 4 X 4 m' 67,056
40. Kabel NYY 4 X 6 m' 81,681

Harga Bahan Upah -7


###
I. HARGA BAHAN / MATERIAL
41. Kabel NYY 4 X 10 m' 112,902
42. Kabel NYY 4 X 16 m' 137,438
43. Kabel NYY 4 X 25 m' 254,531
44. Kabel NYY 4 X 35 m' 356,500
45. kabel NYY 4 x 70 mm² m' 672,000
46. kabel NYY 4 x 95 mm² m' 879,000
47. kabel NYA 1 x 1,5 mm² m' 3,500
48. kabel NYA 1 x 2,5 mm² m' 4,000
49. Kabel, NYA 3X(1X2.5mm2) m' 12,000
50. Kabel antena TV m' 4,193
51. Kabel telepon m' 4,339
52. MCB box isi 4 bh 88,031
53. MCB 10 A MG bh 67,547
54. MCB 6 A MG bh 65,256
55. Kotak kontak khusus (KKK) bh 65,117
56. Conduit pipa PVC dia ⅝" C m' 3,346
57. Tee dos bh 2,448
58. Inbow doos bh 1,040
59. Sock bh 603
60. Klem conduit bh 439
61. Lastdop bh 2,344
62. Flexible pipe m' 2,226
Fhiser bh 100
63. Elbow bh 3,229
64. Kabel Coaxial RG 10 m' 8,500
65. Kabel Coaxial RG 6 m' 6,000
66. KWH meter bh 1,300,000
Kabel BC
67. Kabel BC 4 mm m' 10,000
68. Kabel BC 6 mm m' 21,017
69. Kabel BC 10 mm m' 25,500
68. Kabel BC 16 mm m' 48,000
69. Kabel BC 35mm m' 92,000
70. Kabel BC 50 mm m' 109,000
71. Kabel BC 70 mm m' 255,000
72. Kabel Yellow green 35 mM m' 76,000
73. Material Bantu & ACC Grounding m' 364,000
KABEL Telephone ITC
74. kabel ITC 30 x 2 x 0,6 mm² m' 90,000
75. kabel ITC 30 x 2 x 0,6 mm² m' 90,000
KABEL DATA
76. kabel data Cat-6 belden roll 3,135,000
77. kabel data Cat-5 belden roll 2,375,000
KABEL NYMHY
78. kabel NYMHY 3x1,5 mm2 m' 26,000
79. kabel NYMHY 3x2,5 mm2 m' 34,000
TELEVISION
80. Outlet TV bh 214,000
80. Splitter 4 Way bh 356,000
81. Antena UHF 2,386,000
82. Supoort Antena 64,000
83. Booster IKUSI bh 3,772,000
84. Receiver bh 2,386,000
85. Transmitter bh 14,686,000
86. Rak kabinet bh 564,000
87. Master splitter bh 872,000
88. TB - MATV bh 504,250
PANEL - PANEL
89. Panel P Transfer 9,800,000
90. Panel listrik SDP bh 343,200,000
91. Panel listrik LP/PP bh 115,896,000
92. Testing Commssioning ls 8,000,000
DUCTING & GRILE AC
93. Ami metalizing m' 10,000
94. Bolt & Nut m' 8,000
95. corner m' 22,000
96. Duct tape m' 25,000
97. Glass wool m' 32,000

Harga Bahan Upah -8


###
I. HARGA BAHAN / MATERIAL
98. Hanger/gantungan m' 22,000
99. Packing m' 88,000
100. Plincote m' 202,000
101. Aluminium foil dens. 120 m' 18,000
102. seng plat BJLS 80 m' 325,000
103. EAL 30" m' 792,000
LAMPU
104. DL reflector 6 W bh 364,000
105. DL reflector 6 W + nicad bh 1,332,000
106. DL cover susu 6 W bh 375,000
107. DL cover susu 6 W + nicad bh 1,393,000
108. DL 18 W bh 227,500
109. DL 18 W + NICAD bh 975,500
110. Lampu TL led T8 16 Watt setara Philip bh 110,000
111. Lampu LED Downlight 11 watt bh 100,000
112. Lampu Spotlight bh 105,000
113. Lampu TKO led 1 x 36 watt bh 415,500
114. Lampu TKO led 1 x 36 watt nicad bh 955,500
115. Lampu plafon outbow LED dia. 40cm 5 watt bh 654,000
116. Lampu plafon outbow LED dia. 40cm 5 watt + Nicad bh 1,622,000
117. Lampu RML (M1) 2 x 10 W LED T5 bh 1,455,000
118. Lampu RML (M1) 2 x 10 W LED T5 + nicad bh 2,423,000
119. Lampu spot led 3 w bh 225,000
120. Lampu Tangga bh 320,000
121. Lampu Ceilling Cassete bh 1,120,000
122. Lampu strip LED warm light 15watt/meter + power supply bh 293,000
123. Lampu baret indoor kotak outbow LED 5 watt + NICAD bh 1,824,000
124. Lampu Baret 36 W Nicad bh 985,000
125. Lampu Taman bolar bh 475,000
126. Lampu sorot flood light 100 w bh 2,250,000
127. Lampu led pju light 40 w bh 2,450,000
128. Lampu Gantung bh 5,850,000
129. Lampu Dinding bh 485,000
130. Lampu Exit bh 1,375,000
131. Lampu wastafel led 3 w bh 137,500
132. Lampu LED ROLL + PSU bh 147,000
133. Lampu PJU LED 50 W + MCB BOX bh 6,785,000
134. Tiang Lampu T-9m bh 6,775,000
SAKLAR & STOP KONTAK
135. Stop kontak bh 78,000
136. saklar ganda bh 58,000
137. saklar tunggal bh 42,000
138. Saklar Ganda Tukar bh 42,000
139. Saklar hotel bh 64,000
140. Grid Switch 3 Gang clipsal ET34/2/3A bh 110,000
141. Grid Switch 7 Gang clipsal ET36/2/3A bh 386,000
142. MCB 1 Phase , 6 Amp bh 75,000
PENANGKAL PETIR
143. Penangkal petir elektrostatik R = 150 bh 16,060,000
144. Pole Support + dudukan bh 2,200,000
145. Loop (rod - rod) BC 70 mmmm bh 1,672,000
146. Tiang
Air penangkal
terminal petir + dudukan
16x600mm, solid copper stell c/w support base air bh 1,250,000
147. terminal
Ground electrode solid copper clad steel 3/4" x 3 mtr (19 x bh 720,000
148. 3000mm) bh 507,600
149. Grounding rod 14mm x 1500mm with tinned copper conductor bh 165,600
150. Conductor bonding connector c-type bh 17,280
151. Grounding rod clamp for 70mm2 bh 113,760
152. Unistrut chanel 41x41x2.5x3 m bh 259,200
153. Copper plate 1mx1mx3mm, tinned copper conductor bh 1,371,600
154. compression type cable connector bh 8,640
155. bak kontrol grounding 40x40 cm bh 800,000

TELEPONE
147. TB Telp - 30 pairs (2 crown) bh 416,000
148. Outlet Telephone bh 52,000
149. kabel ITC 2 x 2 x 0,6 mm² bh 3,500
PERANGKAT PANEL SURYA
150. Panel Surya 120 wp bh 2,450,000

Harga Bahan Upah -9


###
I. HARGA BAHAN / MATERIAL
151. baterry panel surya 12v 120 AH bh 2,775,000
152. baterry panel surya 12v 200 AH bh 4,325,000
153. box Baterry Panel surya bh 650,000
154. box Baterry Panel surya cap 2 baterry bh 950,000
155. Controler Panel surya bh 447,000
156. Connector Panel surya bh 67,000
157. dudukan panel surya bh 347,000
158. photocell bh 155,000
DATA
150. Wifi Router ASUS AC1900 bh 6,160,000
151. Modular Jack Cat 5e bh 84,000
152. Outlet LAN data type wall mounted bh 71,500
153. Face Plate 1 Port data RJ 45 cat 6 bh 132,000
CCTV/IP CAMERA
154. IP Camera
155. NVR camera plus booster (5 Camera) bh 4,850,000
156. Divar 16 channel bh 12,950,000
157. BNC bh 12,500
158. Dome Camera Moving unit 3,000,000
159. Monitor 40" unit 5,000,000
160. Kabel Coaxial RG 10 m1 6,500
161. kabel NYMHY 2x1,5 mm2 m1 5,850
TATA SUARA
162. Terminal box panel TS bh 264,000
163. inbouw doos Volume control bh 38,000
164. Volume control bh 197,000
165. Ceiling speaker bh 149,000
Fan
166. SAG 500 x 500 bh 2,675,000
167. RAG 500 x 500 bh 1,320,000
168. FAG 300 x 300 bh 720,000
168. Flexible round duct dia. 6" bh 101,000
169. Flexible round duct dia. 16" bh 343,000
170. Plenum Box Supply dan Return 45.4" x 80.8" x 46.8" (H x W x D) bh 4,664,000
171. Spigot damper bh 220,000
172. ceilling exh. Fan bh 1,000,000
173. Propeller Fan bh 235,000
KABEL TRAY/ LADDER
174. Jointing lader W 100 unit 37,000
175. ladder 600 X 100 mm unit 712,000
176. Straight reducer Ladder W- 600 x 100 unit 999,000
177. outside Ladeder W- 600 x 100 unit 559,000
178. Elbow Tray W- 600 x 100 unit 674,000
179. ladder U 400 X 100 mm unit 710,000
180. Straight reducer Ladder U- 400 x 100 unit 853,000
181. outside Ladeder U - 400 x 100 unit 501,000
182. Elbow Ladder5 U - 400 x 100 unit 616,000
183. Hanger beam unit 79,000
184. Hanger Rood unit 114,000
FIRE ALARM
185. Terminal box FA bh 672,000
186. R.O.R heat detector bh 284,000
187. Patch panel 100 ch / AMP bh 5,150,000
188. Wall mount 19"/12 U / ABBA 12 U bh 28,000,000
189. Photo electric Smoke Detector bh 510,000
190. Manual call point bh 628,000
191. Terminal box action set fire alarm bh 804,000
192. Fixed Temperature heat detector bh 95,500
193. Alarm Bell bh 320,000
194. MCFA 10 Zone bh 27,280,000
195. Indicator lamp bh 50,000
HYDRANT
196. dynabolt 8 mm bh 2,000
197. Besi siku 50 x 50 x 5 bh 21,000
O LAIN-LAIN
1. Panel beton pracetak 50x400x2130 Lbr 110,000
2. Kolom beton pracetak t = 2750 mm btg 170,000
3. Bensin Ltr 7,750

Harga Bahan Upah -10


###
I. HARGA BAHAN / MATERIAL
4. Solar subsidi Ltr 6,500
5. Solar Ltr 8,400
6. Minyak tanah Ltr 11,000
7. Pelumas Ltr 10,500
8. Aspal kg 8,750
9. Semen untuk Filler hotmix kg 14,610
10. Pompa air listrik Shimizu 125 W unit 855,000
11. Pompa air listrik Shimizu 750 W unit 9,600,000
12. bentonite kg 18,000
13. APAR/APAB 50 kg unit 24,500,000

Harga Bahan Upah -11


###
I. HARGA BAHAN / MATERIAL
14. Air Ltr 515
P PEKERJAAN LAPISAN HOTMIX , LANDSCAPE
1. Hotmix 97-100% 2,3 ton/m3 tebal 3 cm m² 99,468
2. Hotmix 97-100% 2,3 ton/m3 tebal 5 cm m² 164,073
3. Pohon perdu BH 250,000
4. Rumput gajah mini m² 20,000
5. Tiang Pipa galvanis dia 2 TP 225 " bh 397,500 ###
6. Pagar BRC dia 8 mm tinggi 175 cm m1 448,750 ###
7. Mur baut Diameter 6 mm bh 500
8. Rell, roda Pagar BRC bh 525,000 ###
9. Kawat Berduri Brzinal 2000 m1 4,485 ###

II. HARGA PERALATAN BARU (sebagai dasar perhitungan sewa alat)


1. Buildozer 100 HP /Jam 1,232,000
2. Buildozer 65 HP /Jam 878,000
3. Motor greader 115 Hp /Jam 902,000
4. Genset + Stone Cruseher 140 HP /Jam 1,727,000
5. Genset + Stone Cruseher 95 HP /Jam 1,485,000
6. Genset + Stone Cruseher 15 HP /Jam 1,245,000
7. Sreen plant 80 HP /Jam 455,000
8. Loader wheelled 115 HP /Jam 567,000
9. Three wheel roller 51 HP /Jam 386,000
10. Tandem Roller 40 HP /Jam 390,000
11. Vibrator Roller 35 HP /Jam 295,000
12. Pnematic tire roller 95 HP /Jam 468,000
13. Vibrator Roller 7 HP /Jam 78,000
14. Vibro Plate Tamper 4 HP /Jam 19,000
15. Concrete Vibrator 4 HP /Jam 23,000
16. Asphal spayer / Distributor 38 HP /Jam 164,000
17. Asphal spayer / Distributor 7 HP /Jam 40,000
18. Asphal spayer / Distributor 4 HP /Jam 302,000
19. Genset + Asphal mixing Plant 125 HP /Jam 3,486,000
20. Genset + Asphal mixing Plant 50 HP /Jam 2,731,000
21. Asphal Finisher 30 HP /Jam 694,000
22. Water Tank truk 115 HP /Jam 387,000
23. Dump truk 3.5 ton 106 HP /Jam 349,000
24. Dump truk 8 ton 175 HP /Jam 555,000
25. Dump truk 5 ton 145 HP /Jam 464,000
26. Plat bed truck 3.5 ton, 80 HP /Jam 263,000
27. Concrete mixer 4 HP /Jam 29,000
28. Concrete mixer 10 HP /Jam 90,000
29. Concrete mixer 7 HP /Jam 160,000
30. Air Compresor 20 HP /Jam 85,000
31. Water pump 8 HP /Jam 30,000
32. Water pump 10 HP /Jam 38,000
33. Exsavator 80 HP /Jam 456,300
1. Air Compressor /Jam 194,933
2. Alat Las /Jam 124,895
3. Beton Molen 400 Ltr /Jam 140,500
4. Beton Triller /Jam 354,359
5. Buldozer /Jam 878,000 65 hp
6. Dump Truck Mitsubishi /Jam 385,000
7. Excavator Hitachi /Jam 862,000 80 hp
8. Flat bed truck /Jam 263,000 80 hp
9. Genset /Jam 1,245,000 95 hp
10. Jack Hummer /Jam 33,721
11. Mesin gilas /Jam 231,000
12. Mesin poles /Hr 112,000
13. Mixer /Hr 52,600
14. Motor Grader /Jam 902,000 115 hp
15. Paving Finisher /Jam 257,500
16. Pneumatic Tired Roller /Jam 358,200
17. Rail /Jam 39,100
18. Side Form /Jam 63,800
19. Sprayer /Hr 44,900
20. Stamper /Jam 28,000
21. Stone Crusher /Jam 822,600
22. Truck Mixer /Jam 280,400

Harga Bahan Upah -12


###
I. HARGA BAHAN / MATERIAL
23. Truk penarik /Jam 84,100
24. Vibrator /Jam 23,000 4 hp
25. Vibro Compactor/Vibratory Roller 6-8 T /Jam 468,000 7 hp
26. Water Tank Truck /Jam 287,918
27. Wheel Loader /Jam 332,800
28. Whell crane /Jam 1,320,500
29. Stone breaker /Jam 381,000
30. Tendem roller /Jam 390,000
31. Ponton pancang /Jam 2,081,000
32. Ponton langsir /Jam 1,445,000
33. Mobile Crane pancang /hari 1,650,000
34. Mobile Crane langsir /Jam 323,000
35. Drop hammer Pancang /hari 168,200
36. Crane Service /hari 105,000
37. MOTOR GRADER 125 HP /Jam 950,000
38. VIBRATING ROLLER 6-8 TON /Jam 468,000
39. WHEEL LOADER 1,0-1,6 M3 /Jam 332,800
40. DUMP TRUCK 3,5 TON /Jam 385,000
41. TANDEM ROLLER 6-8 TON /Jam 390,000
42. WATER TANK TRUCK 3000-4500 L /Jam 287,918
43. ASPHALT DISTRIBUTOR /Jam 275,000
44. AIR COMPRESSOR /Jam 194,933
45. DUMP TRUCK 10 TON /Jam 450,000
46. THREE WHEEL ROLLER 8-10 TON /Jam 475,000
47. ASPHALT SPRAYER /Jam 250,000

III. UPAH TENAGA


1. Pekerja OH 100,000 ###
2. Tukang gali OH 150,000 ###
3. Tukang kayu OH 150,000 ###
4. Tukang batu OH 150,000 ###
5. Tukang besi OH 150,000 ###
6. Tukang las OH 150,000 ###
7. Tukang cat OH 150,000 ###
8. Tukang alumunium OH 150,000 ###
9. Tukang gypsum OH 150,000 ###
10. Tukang pasang pipa OH 150,000 ###
11. Tukang pasang listrik OH 150,000 ###
12. Tukang aspal OH 150,000 ###
13. Kepala tukang OH 180,000 ###
14. Kepala tukang pasang pipa OH 180,000 ###
15. Kepala tukang pasang listrik OH 180,000 ###
16. Surveyor OH 180,000
17. Instalator OH 180,000 ###
18. Operator alat berat OH 170,000 ###
19. Pembantu operator alat berat OH 110,000 ###
20. Mandor OH 200,000 ###

Q Tambahan
Oksigen (tabung) tabung 1,360,000 ###
Elpiji / oksigen ls 500
Acetelin @ 15 kg tabung 2,400,000 ###
Agegat Pecah Mesin 20 - 30 mm m3 360,000 ###
Wiring Ls 4,500
Lampu Downlight LED 11 Watt bh 90,000
Concrete Aggregate 10mm - 20mm m3 570,000 ###
Kaso 5/7 batang 232,000
Plafon asbes 3mm kg 22,750 ###
asbes gelombang lembar 81,000
paku asbes kg 139,000
Pintu Rangka Kayu (double teakwood) bh 1,596,000
Pembantu Surveyor oh 80,000
Operasional Crawel Crane (Hari) hari 8,448,000 ###
Operasional Ponton Transport (Hari) hari 41,066,667 ###
Sekretaris ob 1,280,000 ###
Album Foto eksemplar 100,000
As Built Drawing eksemplar 300,000

Harga Bahan Upah -13


###
I. HARGA BAHAN / MATERIAL
Laporan Bulanan eksemplar 100,000
Laporan Harian eksemplar 100,000
Laporan Mingguan eksemplar 100,000
Alat Tulis Kantor bulan 100,000
Biaya Komunikasi/dokumentasi bulan 500,000
Tiang Pancang 50 x 50 panjang 6 meter m1 475,000 ###
Exhaust Fan Plafond buah 712,500

Harga Bahan Upah -14


1

DAFTAR HARGA MATERIAL


PEKERJAAN : RAB DED Sisi Darat Pelabuhan Tanjung Moco
LOKASI : DERMAGA MOCO, TANJUNG PINANG
TAHUN ANGGARAN 2020 HARGA
SATUAN
NO URAIAN SAT (Rp) KET
I. HARGA BAHAN / MATERIAL
A PASIR, BATU DAN SEMEN
1. Pasir pasang m³ 198,000 Buku Jurnal Edisi 39 Tahun 2020
2. Pasir urug m³ 170,000 Buku Jurnal Edisi 39 Tahun 2020
3. Pasir beton m³ 263,000 Buku Jurnal Edisi 39 Tahun 2020
4. Tanah urug m³ 45,320 Buku Jurnal Edisi 39 Tahun 2020
5. Tanah Timbunan pilihan m³ 45,320 Buku Jurnal Edisi 39 Tahun 2020
6. Sirtu m³ 267,000 Buku Jurnal Edisi 39 Tahun 2020
7. Sirtu non quari m³ 230,000 Buku Jurnal Edisi 39 Tahun 2020
8. Tanah merah m³ 187,000 Buku Jurnal Edisi 39 Tahun 2020
9. Abu batu m³ 268,900 Buku Jurnal Edisi 39 Tahun 2020
10. Batu pecah 5/7 m³ 268,900 Buku Jurnal Edisi 39 Tahun 2020
11. Batu pecah/split 3/4 m³ 268,900 Buku Jurnal Edisi 39 Tahun 2020
12. Batu pecah/split 2/3 m³ 268,900 Buku Jurnal Edisi 39 Tahun 2020
13. Batu pecah/split 1/2 m³ 268,900 Buku Jurnal Edisi 39 Tahun 2020
14. Batu pecah/split 0,5/1 (screening) m³ 268,900 Buku Jurnal Edisi 39 Tahun 2020
15. Batu kali m³ 268,900 Buku Jurnal Edisi 39 Tahun 2020
16. Batu Bongkahan (170-230mm) m³ 650,000 Buku Jurnal Edisi 39 Tahun 2020
17. Batu Bongkahan (100-170mm) m³ 650,000 Buku Jurnal Edisi 39 Tahun 2020
18. Bata merah bh 2,500 Buku Jurnal Edisi 39 Tahun 2020
19. Bata tela 7x14x28 cm bh 2,500 Buku Jurnal Edisi 39 Tahun 2020
20. Roster beton kecil bh 20,000 Buku Jurnal Edisi 39 Tahun 2020
21. Roster beton Sedang bh 41,700 Buku Jurnal Edisi 39 Tahun 2020
22. Roster beton Besar bh 75,000 Buku Jurnal Edisi 39 Tahun 2020
23. Paving Blok Balok/batu bata bh 168,000 Buku Jurnal Edisi 39 Tahun 2020
24. Paving Blok segi enam kecil merah bh 153,600 Buku Jurnal Edisi 39 Tahun 2020
25. Paving blok segi enam keci abu abu bh 120,000 Buku Jurnal Edisi 39 Tahun 2020
26. Paving Blok segi enam besar merah bh 140,000 Buku Jurnal Edisi 39 Tahun 2020
27. Paving blok segi enam Besar abu abu bh 140,000 Buku Jurnal Edisi 39 Tahun 2020
28. Kanstin paving abu-abu (10x20x40) cm bh 168,000 Buku Jurnal Edisi 39 Tahun 2020
29. Batu Alam m² 153,300 Buku Jurnal Edisi 39 Tahun 2020
30. Batu palimanan m² 226,700 Buku Jurnal Edisi 39 Tahun 2020
31. Batu Andesit m² 226,700 Buku Jurnal Edisi 39 Tahun 2020
32. Batu garis m² 248,300 Buku Jurnal Edisi 39 Tahun 2020
33. Batu tempel m² 83,333 Buku Jurnal Edisi 39 Tahun 2020
34. Semen portland kg 1,600 Buku Jurnal Edisi 39 Tahun 2020
35. Semen portland warna/ nat keramik kg 25,000 INDO MAS
36. Semen Gresik 50 kg sak 77,000 Buku Jurnal Edisi 39 Tahun 2020
37. Semen Holcim 50 kg sak 79,000 Buku Jurnal Edisi 39 Tahun 2020
38. Semen Tonasa 50 kg sak 75,700 Buku Jurnal Edisi 39 Tahun 2020
39. Bata ringan (60x20x10) cm bh 15,000 Buku Jurnal Edisi 39 Tahun 2020
40. Bata ringan (60x20x7,5) cm bh 14,000 Buku Jurnal Edisi 39 Tahun 2020
41. MU-380 (Perekat Pas Bata Ringan) kg 4,688 Buku Jurnal Edisi 39 Tahun 2020
42. MU-301 (Plesteran) kg 1,800 Buku Jurnal Edisi 39 Tahun 2020
43. MU-200 (Acian) kg 6,000 Buku Jurnal Edisi 39 Tahun 2020
44. Batako bh 3,000 Buku Jurnal Edisi 39 Tahun 2020
45. beton Decking bh 250 Buku Jurnal Edisi 39 Tahun 2020
46. Beton Readymix mutu K-125 m3 1,105,500 Buku Jurnal Edisi 39 Tahun 2020
47. Beton Readymix mutu K-225 m3 1,188,000 Buku Jurnal Edisi 39 Tahun 2020
48. Beton Readymix mutu K-250 m3 1,250,000 Buku Jurnal Edisi 39 Tahun 2020
49. Beton Readymix mutu K-300 m3 1,282,000 Buku Jurnal Edisi 39 Tahun 2020
50. Beton Readymix mutu K-350 m3 1,355,000 Buku Jurnal Edisi 39 Tahun 2020
51. Beton Readymix mutu K-400 m3 1,500,000 Buku Jurnal Edisi 39 Tahun 2020
52. Waterprofing Crystaline kg 69,000 Buku Jurnal Edisi 39 Tahun 2020
53. Waterstop m1 235,200 Buku Jurnal Edisi 39 Tahun 2020
54. Sika Grout kg 6,600 Buku Jurnal Edisi 39 Tahun 2020
55. Penyemprotan Anti Rayap m2 27,500 Buku Jurnal Edisi 39 Tahun 2020
56. Tiang Pancang 25 x 25 panjang 6 meter m1 175,000 Buku Jurnal Edisi 39 Tahun 2020
HARGA
SATUAN
NO URAIAN SAT (Rp) KET
B BAHAN KAYU
1. Kayu kelas I 10 x 10 x 400 (kayu besi) m³ 4,000,000 Buku Jurnal Edisi 39 Tahun 2020
2. Kayu kelas I 6 x 12 x 400 (kayu besi) m³ 4,000,000 Buku Jurnal Edisi 39 Tahun 2020
3. Kayu kelas I 5 x 5 x 400 (kayu besi) m³ 4,000,000 Buku Jurnal Edisi 39 Tahun 2020
4. Kayu kelas I 2,5 x 25 x 400 (Papan kayu besi) m³ 4,200,000 Buku Jurnal Edisi 39 Tahun 2020
5. Kayu kelas I 3 x 30 x 400 (Papan kayu besi) m³ 4,200,000 Buku Jurnal Edisi 39 Tahun 2020
6. Kayu kelas II 5 x 10 x 400 (kayu matoa) m³ 2,700,000 Buku Jurnal Edisi 39 Tahun 2020
7. Kayu kelas II 5 x 5 x 400 (kayu matoa) m³ 2,700,000 Buku Jurnal Edisi 39 Tahun 2020
8. Kayu kelas III 5 x 10 x 400 (kayu lombo) m³ 2,200,000 Buku Jurnal Edisi 39 Tahun 2020
9. Kayu kelas III 5 x 5 x 400 (kayu lombo) m³ 2,200,000 Buku Jurnal Edisi 39 Tahun 2020
10. Kayu kelas III 2,5 x 25 x 400 (kayu lombo) m³ 2,200,000 Buku Jurnal Edisi 39 Tahun 2020
11. Kayu Dolken / mangi-mangi Ø 5-7 cm btng 57,500 Buku Jurnal Edisi 39 Tahun 2020
KAYU PUTIH /CAMPURAN ( untuk Bekisting)
12. Balok ukuran 5 x 10 m³ 2,500,000 Buku Jurnal Edisi 39 Tahun 2020
13. Balok ukuran 10 x 10 m³ 2,500,000 Buku Jurnal Edisi 39 Tahun 2020
14. Papan ukuran 2,5 x 20 m³ 2,500,000 Buku Jurnal Edisi 39 Tahun 2020

C KAYU LAPIS DAN LEMBARAN


1. Teakwood 3x7 ft 3 mm Lbr 103,000 Buku Jurnal Edisi 39 Tahun 2020
2. Teakwood 4x8 ft 3 mm Lbr 135,000 Buku Jurnal Edisi 39 Tahun 2020
3. Triplek 4x8 ft 3 mm Lbr 65,000 INDOMAS
4. Triplek 4x8 ft 4 mm Lbr 85,000 INDOMAS
5. Triplek 4x8 ft 5 mm Lbr 78,700 Buku Jurnal Edisi 39 Tahun 2020
6. Triplek 4x8 ft 6 mm Lbr 100,000 INDOMAS
7. Triplek 4x8 ft 9 mm Lbr 150,000 INDOMAS
8. Triplek 4x8 ft 12 mm Lbr 190,000 INDOMAS
9. Gypsumboard (1200x2400x9) mm Lbr 120,000 Buku Jurnal Edisi 39 Tahun 2020
10. GRC-board (1200x2400x4) mm Lbr 86,000 Buku Jurnal Edisi 39 Tahun 2020
11. Calsiboard 120x240 cm 4 mm Lbr 127,500 Buku Jurnal Edisi 39 Tahun 2020
12. Sekrup gypsum bh 32,000 CIJ
13. Textile tape 90m/rol 47,500 Buku Jurnal Edisi 39 Tahun 2020
14. Compound 20kg/zak 82,500 Buku Jurnal Edisi 39 Tahun 2020
15. List gypsum m1 50,000 Buku Jurnal Edisi 39 Tahun 2020
16. Paku peluru ramset bh 3,885 Buku Jurnal Edisi 39 Tahun 2020
17. Hollow 4x4 cm tbl 0.35 mm btng 37,500 Buku Jurnal Edisi 39 Tahun 2020
18. Hollow 2x4 cm tbl 0.35 mm btng 28,500 Buku Jurnal Edisi 39 Tahun 2020
19. Sekrup 6x1-1,5 bh 180 Buku Jurnal Edisi 39 Tahun 2020
20. Tako HPL warna kayu m2 117,769 Buku Jurnal Edisi 39 Tahun 2020

D LANTAI, PARTISI & RANGKA ATAP TERPASANG


1. Lantai Beton FLY SLAP m2 950,000 Buku Jurnal Edisi 39 Tahun 2020
2. Atap baja ringan (terpasang) m² 235,000 Buku Jurnal Edisi 39 Tahun 2020
3. Partisi Cubikal Toilet (terpasang) m² 1,950,000 Buku Jurnal Edisi 39 Tahun 2020

E BAHAN BESI
1. Besi beton polos kg 25,200 Buku Jurnal Edisi 39 Tahun 2020
2. Besi beton ulir kg 31,200 Buku Jurnal Edisi 39 Tahun 2020
3. Jaring kawat baja/wiremesh kg 13,369 Buku Jurnal Edisi 39 Tahun 2020
4. Kawat beton kg 28,200 Buku Jurnal Edisi 39 Tahun 2020
8. Besi pelat strip kg 42,900 Buku Jurnal Edisi 39 Tahun 2020
9. Besi segi empat 3/8"x3/8" (0,83kg/m') kg 15,400 Buku Jurnal Edisi 39 Tahun 2020
10. Besi baja I/WF kg 15,400 Buku Jurnal Edisi 39 Tahun 2020
11. Besi baja profil kg 40,200 Buku Jurnal Edisi 39 Tahun 2020
12. Besi siku L 30.30.3 kg 24,200 Buku Jurnal Edisi 39 Tahun 2020
Besi siku L 40.40.3 kg 27,400 Buku Jurnal Edisi 39 Tahun 2020
13. Besi plat hitam (mild steel plate) 2 mm kg 15,400 Buku Jurnal Edisi 39 Tahun 2020
14. Kawat las kg 41,600 Buku Jurnal Edisi 39 Tahun 2020
15. Profil aluminium 3" m' 180,000 Buku Jurnal Edisi 39 Tahun 2020
16. Profil aluminium 4" m' 225,000 Buku Jurnal Edisi 39 Tahun 2020
17. Aluminium strip m' 48,200 Buku Jurnal Edisi 39 Tahun 2020
18. Angkur M10 bh 32,100 Buku Jurnal Edisi 39 Tahun 2020
19. Angkur M20 bh 45,000 Buku Jurnal Edisi 39 Tahun 2020
20. Hollow Besi 40x20 btng 205,710 Buku Jurnal Edisi 39 Tahun 2020
21. Hollow Besi 50x50 btng 322,242 Buku Jurnal Edisi 39 Tahun 2020
22. Hollow Besi 50x100 btng 609,690 Buku Jurnal Edisi 39 Tahun 2020
23. Hollow Besi 60x30 btng 218,925 Buku Jurnal Edisi 39 Tahun 2020
24. Hollow Besi 60x60 btng 392,550 Buku Jurnal Edisi 39 Tahun 2020
25. Hollow Besi 100x100 btng 693,000 Buku Jurnal Edisi 39 Tahun 2020
26. List alumunium U Chanel m1 15,000 Buku Jurnal Edisi 39 Tahun 2020
27. List Profil m1 18,000 Buku Jurnal Edisi 39 Tahun 2020
Harga Bahan Upah -2
HARGA
SATUAN
NO URAIAN SAT (Rp) KET
28. Pagar BRC dengan tiang D6mm m2 175,894 Buku Jurnal Edisi 39 Tahun 2020
29. Alumunium Compsite m2 425,000 Buku Jurnal Edisi 39 Tahun 2020
30. Hollow Besi Galvanis 4x4x 1mm btg 115,000 Buku Jurnal Edisi 39 Tahun 2020
31. Braket siku btg 60,000 Buku Jurnal Edisi 39 Tahun 2020
32. Paku skrup beton kg

F BAHAN KERAMIK DAN PENUTUP LAIN


1. Keramik Lantai 80 x 80 bh 261,120 Rezeki Lancar Abadi
2. Keramik 60 x 60 polos bh 46,800 Rezeki Lancar Abadi
3. Keramik 60 x 60 warna bh 50,400 Rezeki Lancar Abadi
4. Keramik 50 x 50 (agatha) bh 22,250 Rezeki Lancar Abadi
5. Keramik 50 x 50 (roman) bh 27,000 Rezeki Lancar Abadi
6. Keramik 40 x 40 (JTS) bh 12,800 INDO MAS
7. Keramik 40 x 40 (Mulia) bh 14,400 INDO MAS
8. Keramik 25 x 40 (Diamond) bh 7,500 INDO MAS
9. Keramik 25 x 25 (Diamond) bh 4,375 INDO MAS
10. Keramik 20 x 40 (JTS) bh 6,400 INDO MAS
11. Granito Biasa 60 x 60 cm bh 108,500 Buku Jurnal Edisi 39 Tahun 2020
12. Granito KW1 60 x 60 cm bh 125,650 Buku Jurnal Edisi 39 Tahun 2020
13. Marmer putih 40 x 60 cm bh 95,550 Buku Jurnal Edisi 39 Tahun 2020
14. Marmer putih 40 x 60 cm bh 101,850 Buku Jurnal Edisi 39 Tahun 2020
15. Ubin keramik 40 x 40 cm Roman bh 30,000 Buku Jurnal Edisi 39 Tahun 2020
16. Ubin keramik 30 x 30 cm Roman bh 12,409 Buku Jurnal Edisi 39 Tahun 2020
17. Ubin keramik 20 x 20 cm Roman bh 6,000 Buku Jurnal Edisi 39 Tahun 2020
18. Ubin keramik 20 x 25 cm Roman bh 7,013 Buku Jurnal Edisi 39 Tahun 2020
16. Keramik Dinding 30 x 30 cm Roman bh 19,773 Buku Jurnal Edisi 39 Tahun 2020
19. Ubin keramik 10 x 20 cm Roman bh 3,500 Buku Jurnal Edisi 39 Tahun 2020
20. Ubin keramik 5 x 20 cm Roman bh 3,250 Buku Jurnal Edisi 39 Tahun 2020
21. Stepnozing 10 x 60 cm bh 49,500 Buku Jurnal Edisi 39 Tahun 2020
22. Floor hardener kg 86,250 Buku Jurnal Edisi 39 Tahun 2020
23. Dinding Granite 60 x 60 hitam m2 870,000 Buku Jurnal Edisi 39 Tahun 2020

G BAHAN PENUTUP ATAP


1. Seng gelombang 3x6 ft BJLS 30 (0,3 mm) Lbr 69,300 Buku Jurnal Edisi 39 Tahun 2020
2. Seng gelombang 3x7 ft BJLS 30 (0,3 mm) Lbr 80,300 Buku Jurnal Edisi 39 Tahun 2020
3. Seng gelombang 3x8 ft BJLS 30 (0,3 mm) Lbr 92,400 Buku Jurnal Edisi 39 Tahun 2020
4. Seng gelombang 3x6 ft BJLS 20 (0,2 mm) Lbr 47,300 Buku Jurnal Edisi 39 Tahun 2020
5. Seng gelombang 3x7 ft BJLS 20 (0,2 mm) Lbr 56,100 Buku Jurnal Edisi 39 Tahun 2020
6. Seng gelombang 3x8 ft BJLS 20 (0,2 mm) Lbr 63,800 Buku Jurnal Edisi 39 Tahun 2020
7. Seng Multiroof Sakura Roof 0,2 Lbr 49,500 Buku Jurnal Edisi 39 Tahun 2020
8. Seng plat 3x6 ft BJLS 30 (0,3 mm) Lbr 40,100 Buku Jurnal Edisi 39 Tahun 2020
9. Atap Spandek Lbr 160,000 Cahaya Indah Jaya
10. Nok Atap Lbr 38,500 Buku Jurnal Edisi 39 Tahun 2020
11. Atap Onduline 200 x 95 cm Lbr 198,000 Buku Jurnal Edisi 39 Tahun 2020
12. Atap Onduline 106 x 40 cm Lbr 102,300 Buku Jurnal Edisi 39 Tahun 2020
13. Atap Onduline 100 x 50 cm Lbr 33,000 Buku Jurnal Edisi 39 Tahun 2020
14. Atap Fiber Glass transparan lbr 207,000 Buku Jurnal Edisi 39 Tahun 2020
15. Genteng metal m² 38,000 Buku Jurnal Edisi 39 Tahun 2020
16. Nok genteng metal bh 28,000 Buku Jurnal Edisi 39 Tahun 2020
17. Aluminium foil m² 8,500 Buku Jurnal Edisi 39 Tahun 2020
18. Roofmesh m2 10,986 Buku Jurnal Edisi 39 Tahun 2020
19. Lisplank GRC 10 x 30 m1 49,000 Buku Jurnal Edisi 39 Tahun 2020
20. Glass Woll T= 2" density 24 m2 17,917 Buku Jurnal Edisi 39 Tahun 2020
21. Lisplank Kayu Jati m' 125,000 Buku Jurnal Edisi 39 Tahun 2020

H BAHAN CAT KAYU DAN TEMBOK Buku Jurnal Edisi 39 Tahun 2020
1. Dempul kayu Arsego kg 20,000 Cahaya Indah Jaya
2. Plamir kayu kg 44,000 Buku Jurnal Edisi 39 Tahun 2020
3. Plamir tembok kg 52,800 Buku Jurnal Edisi 39 Tahun 2020
4. Cat tembok setara Catylac kg 33,000 INDO MAS
5. Cat tembok setara JOTUN Interior kg 72,000 INDO MAS
6. Cat tembok setara JOTUN kg 118,800 Buku Jurnal Edisi 39 Tahun 2020
7. Cat tembok Dulux/ICI kg 88,200 Buku Jurnal Edisi 39 Tahun 2020
8. Cat tembok Dulux/ICI Weathershield kg 120,000 Buku Jurnal Edisi 39 Tahun 2020
9. Cat meni kayu kg 26,000 INDO MAS
10. Cat meni besi kg 37,000 INDO MAS
11. Cat kayu kg 37,000 INDO MAS
12. Cat zinchromate kg 37,000 INDO MAS
13. Wood filler Ultran kg 85,909 Buku Jurnal Edisi 39 Tahun 2020
14. Minyak cat/tiner Ltr 33,000 Buku Jurnal Edisi 39 Tahun 2020
Harga Bahan Upah -3
HARGA
SATUAN
NO URAIAN SAT (Rp) KET
15. Politur jadi Ltr 66,700 Buku Jurnal Edisi 39 Tahun 2020
16. Vernis Ltr 58,500 Buku Jurnal Edisi 39 Tahun 2020
17. Residu Ltr 15,000 Buku Jurnal Edisi 39 Tahun 2020
18. Amplas Lbr 7,000 INDO MAS
19. Kapi bh 20,000 INDO MAS
20. Kuas Biasa 2'' bh 10,000 INDO MAS
21. Kuas Biasa 3'' bh 15,000 INDO MAS
22. Kuas roll bh 45,000 INDO MAS
23. Ijuk kg 21,122 Buku Jurnal Edisi 39 Tahun 2020
24. Lem kayu fox Ltr 27,500 Buku Jurnal Edisi 39 Tahun 2020
25. Waterproofing coating kg 56,000 Buku Jurnal Edisi 39 Tahun 2020
26. Cat Melamik m2 250,000 Buku Jurnal Edisi 39 Tahun 2020

I PAKU
1. Paku biasa 2"-5" kg 15,000 INDO MAS
2. Paku biasa 1/2"- 1" kg 25,000 INDO MAS
3. Paku sekrup 3,5" bh 15,000 Buku Jurnal Edisi 39 Tahun 2020
4. Sekrup kg 45,000 Buku Jurnal Edisi 39 Tahun 2020
5. Paku beton kg 35,700 Buku Jurnal Edisi 39 Tahun 2020
6. Paku seng kg 25,000 Buku Jurnal Edisi 39 Tahun 2020

J BAHAN KACA
1. Jendela nako (rangka) daun 147,000 Buku Jurnal Edisi 39 Tahun 2020
2. Kaca 3 mm m² 173,000 Buku Jurnal Edisi 39 Tahun 2020
3. Kaca 5 mm m² 218,000 Buku Jurnal Edisi 39 Tahun 2020
4. Kaca 10 mm m² 212,000 Buku Jurnal Edisi 39 Tahun 2020
5. Kaca Tempered 12 mm m² 833,000 Buku Jurnal Edisi 39 Tahun 2020
6. Kaca raiben 5 mm m² 210,000 Buku Jurnal Edisi 39 Tahun 2020
7. Kaca raiben 10 mm m² 241,000 Buku Jurnal Edisi 39 Tahun 2020
9. Sealant jendela kaca tube 52,500 Buku Jurnal Edisi 39 Tahun 2020
10. Cermin tebal 5mm m2 130,000 JAYA KERAMIK

K BAHAN SANITASI
1. Kloset duduk setara Toto (tdk sederhana) Toto CW633 bh 1,450,000 Rezeki Lancar Abadi
2. Wastafel Toto LW246 bh 430,000 Rezeki Lancar Abadi
3. Jet Washer Toto THX20NB bh 245,000 Rezeki Lancar Abadi
4. Floor drain stainless Toto TXIEB bh 330,000 Rezeki Lancar Abadi
5. Seal tape bh 3,000 Rezeki Lancar Abadi
6. Kran air stainless bh 105,000 Rezeki Lancar Abadi
7. Klosed duduk (CW 420J-SW420JP) bh 1,888,000 Rezeki Lancar Abadi
8. Wastafel (LW 568 B) bh 555,000 Rezeki Lancar Abadi
9. Wastafel Gantung (LW 247) bh 605,000 Rezeki Lancar Abadi
10. Kran bh 40,000 INDO MAS
11. Shower Spreay (THX 20 NB) bh 245,000 Rezeki Lancar Abadi
12. Shower Bath (TX 474 SP) bh 1,408,000 Rezeki Lancar Abadi
13. Urinoir ( U 57 WW) bh 1,885,000 Rezeki Lancar Abadi
14. Sekat Urinoir ( A 100) bh 1,200,000 Surya Jaya Keramik
15. Tempat Tissue Emponim 81013 bh 175,000 Rezeki Lancar Abadi
16. Tempat Sabun Emponim bh 207,000 Rezeki Lancar Abadi
17. Cermin bh 210,000 Buku Jurnal Edisi 39 Tahun 2020
18. Toto Floor Drain TX1EB bh 330,000 Rezeki Lancar Abadi
19. Sealant tube 52,500 Rezeki Lancar Abadi
20. Sink Emporium 1 800,000 Rezeki Lancar Abadi

L BAHAN KUCI DAN ALAT PENGGANTUNG Buku Jurnal Edisi 39 Tahun 2020
1. Kunci tanam sederhana bh 58,000 Buku Jurnal Edisi 39 Tahun 2020
2. Kunci tanam biasa bh 90,000 INDO MAS
3. Kunci tanam antik bh 331,641 Buku Jurnal Edisi 39 Tahun 2020
4. Kunci tanam KM bh 150,000 INDO MAS
5. Kunci silinder bh 45,000 INDO MAS
6. Engsel pintu biasa/sederhana bh 18,000 INDO MAS
7. Engsel pintu kuningan/stainless bh 30,000 INDO MAS
8. Engsel jendela bh 25,000 INDO MAS
9. Engsel angin bh 24,000 Buku Jurnal Edisi 39 Tahun 2020
11. Kait angin bh 22,522 Buku Jurnal Edisi 39 Tahun 2020
12. Door closer bh 352,000 Buku Jurnal Edisi 39 Tahun 2020
13. Kunci selot bh 64,900 Buku Jurnal Edisi 39 Tahun 2020
14. Pintu Aluminium + kaca m² 1,587,302 Buku Jurnal Edisi 39 Tahun 2020
15. Jendela Aluminium + Kaca m² 989,583 Buku Jurnal Edisi 39 Tahun 2020
16. Door holder bh 60,900 Buku Jurnal Edisi 39 Tahun 2020
Harga Bahan Upah -4
HARGA
SATUAN
NO URAIAN SAT (Rp) KET
17. Door stop bh 53,100 Buku Jurnal Edisi 39 Tahun 2020
18. Rel pintu dorong bh 279,392 Buku Jurnal Edisi 39 Tahun 2020
19. Engsel Pintu dorma bh 2,250,000 Buku Jurnal Edisi 39 Tahun 2020
20. Handle Pintu stainlist set 165,000 Buku Jurnal Edisi 39 Tahun 2020
21. Dust Proof m1 12,500 Buku Jurnal Edisi 39 Tahun 2020
22. Portal acp rangka baja ls 3,500,000 Buku Jurnal Edisi 39 Tahun 2020

M BAHAN PIPA
1. Pipa galvanis dia 1/2" m' 35,000 INDO MAS
2. Pipa galvanis dia 3/4" m' 43,750 INDO MAS
3. Pipa galvanis dia 1" m' 68,750 INDO MAS
4. Pipa galvanis dia 1 ¼" m' 87,500 INDO MAS
5. Pipa galvanis dia 1 ½" m' 105,000 INDO MAS
6. Pipa galvanis dia 2" m' 363,574 Buku Jurnal Edisi 39 Tahun 2020
7. Pipa galvanis hitam dia 2" untuk pagar m' 239,575 Buku Jurnal Edisi 39 Tahun 2020
8. Pipa galvanis dia 2 ½" m' 187,500 INDO MAS
9. Pipa galvanis dia 3" m' 245,000 INDO MAS
10. Pipa galvanis dia 4" m' 387,500 INDO MAS
10. Pipa gip medium class 8" m' 1,375,000 Buku Jurnal Edisi 39 Tahun 2020
11. Pipa PVC dia 1/2" AW m' 6,034 Rezeki Lancar Abadi
12. Pipa PVC dia 3/4" AW m' 8,000 Rezeki Lancar Abadi
13. Pipa PVC dia 1" AW m' 11,000 Rezeki Lancar Abadi
14. Pipa PVC dia 1 ¼" AW m' 16,897 Rezeki Lancar Abadi
15. Pipa PVC dia 1 ¼" D m' 10,690 Rezeki Lancar Abadi
16. Pipa PVC dia 1 ½" AW m' 19,310 Rezeki Lancar Abadi
17. Pipa PVC dia 1 ½" D m' 11,897 Rezeki Lancar Abadi
18. Pipa PVC dia 2" AW m' 24,655 Rezeki Lancar Abadi
19. Pipa PVC dia 2" D m' 15,345 Rezeki Lancar Abadi
20. Pipa PVC dia 2 ½" AW m' 36,034 Rezeki Lancar Abadi
21. Pipa PVC dia 2 ½" D m' 20,690 Rezeki Lancar Abadi
22. Pipa PVC dia 3" AW m' 50,690 Rezeki Lancar Abadi
23. Pipa PVC dia 3" D m' 27,414 Rezeki Lancar Abadi
24. Pipa PVC dia 4" AW m' 83,793 Rezeki Lancar Abadi
25. Pipa PVC dia 4" D m' 43,103 Rezeki Lancar Abadi
26. Pipa PVC dia 6" AW m' 186,379 Rezeki Lancar Abadi
27. uditch 500x500 panj. 120 cm bh 750,000 Buku Jurnal Edisi 39 Tahun 2020
28. uditch 400x400 panj. 120 cm bh 498,000 Buku Jurnal Edisi 39 Tahun 2020
29. uditch 300x400 panj. 120 cm bh 445,200 Buku Jurnal Edisi 39 Tahun 2020
30. Box Culvert 30 x 40 x 120 cm bh 475,000 Buku Jurnal Edisi 39 Tahun 2020
31. Tutup Uditch 500x500 panj. 120 cm bh 247,200 Buku Jurnal Edisi 39 Tahun 2020
32. Tutup uditch 400x400 panj. 120 cm bh 187,200 Buku Jurnal Edisi 39 Tahun 2020
33. Tutup uditch 300x400 panj. 120 cm bh 123,600 Buku Jurnal Edisi 39 Tahun 2020
STP
30. Septic tank biofil 8 m3 unit 49,250,000 Buku Jurnal Edisi 39 Tahun 2020
31. Septic tank biofil 1 m3 unit 9,300,000 Buku Jurnal Edisi 39 Tahun 2020
32. Septic tank biofil 3 m3 unit 28,800,000 Buku Jurnal Edisi 39 Tahun 2020
33. Sumur resapan unit 16,000,000 Buku Jurnal Edisi 39 Tahun 2020
34. Material Instalasi Septic Tank 2 m3 ls 8,050,000 PM 78 2014
AIR CONDISIONER & FAN (tata udara)
1. AC split cap 1/2 PK bh 4,445,000 Buku Jurnal Edisi 39 Tahun 2020
2. AC split cap 1 PK bh 5,736,000 Buku Jurnal Edisi 39 Tahun 2020
3. AC split cap 1 1/2 PK bh 6,727,200 Buku Jurnal Edisi 39 Tahun 2020
4. AC split cap 2 PK bh 7,842,300 Buku Jurnal Edisi 39 Tahun 2020
5. AC 3 PK Caesette bh 19,367,500 Buku Jurnal Edisi 39 Tahun 2020
6. AC 5 PK Caesette bh 34,537,700 Buku Jurnal Edisi 39 Tahun 2020
7. AC SPLIT Duct 200.000 Btuh bh 220,000,000 Buku Jurnal Edisi 39 Tahun 2020
8. Filter viledone bh 792,000 Buku Jurnal Edisi 39 Tahun 2020
9. Thermostat bh 2,200,000 Buku Jurnal Edisi 39 Tahun 2020
10. Fiting AC Split Duct bh 9,680,000 Buku Jurnal Edisi 39 Tahun 2020
11. Connecting AC Split duct bh 2,640,000 Buku Jurnal Edisi 39 Tahun 2020
12. Support & Pondasi Ac Split Duct bh 2,024,000 Buku Jurnal Edisi 39 Tahun 2020
13. Bracket AC bh 132,000 Buku Jurnal Edisi 39 Tahun 2020
14. Bracket AC kecil bh 132,000 Buku Jurnal Edisi 39 Tahun 2020
15. Dreyer ls 748,000 Buku Jurnal Edisi 39 Tahun 2020
16. valve ls 308,000 Buku Jurnal Edisi 39 Tahun 2020
17. sight glass bh 369,000 Buku Jurnal Edisi 39 Tahun 2020
18. freon ls 2,376,000 Buku Jurnal Edisi 39 Tahun 2020
19. Pipa refrigerant 1/4" + 3/8 " isolasi m' 85,000 Buku Jurnal Edisi 39 Tahun 2020
20. Pipa tembaga dia. 1/2" + 1/4 " isolasi m' 99,000 Buku Jurnal Edisi 39 Tahun 2020
21. Pipa tembaga dia. 3/8" + 5/8" isolasi m' 144,000 Buku Jurnal Edisi 39 Tahun 2020
Harga Bahan Upah -5
HARGA
SATUAN
NO URAIAN SAT (Rp) KET
22. Pipa tembaga dia. 3/8" + 3/4" isolasi m' 179,000 Buku Jurnal Edisi 39 Tahun 2020
23. Pipa refrigerant 1 1/8 " isolasi 267,000 Buku Jurnal Edisi 39 Tahun 2020
24. Pipa tembaga dia. 5/8" isolasi 93,000 Buku Jurnal Edisi 39 Tahun 2020
25. insuflex 3/4" (19.1 mm) m' 13,000 Buku Jurnal Edisi 39 Tahun 2020
26. insuflex 1" (25.4 mm) m' 23,000 Buku Jurnal Edisi 39 Tahun 2020
27. insuflex 1.5" (38.1 mm) m' 44,000 Buku Jurnal Edisi 39 Tahun 2020
28. Isolasi tape 2" roll 12,000 Buku Jurnal Edisi 39 Tahun 2020
29. VINYL TAPE ADHESIVE roll 17,000 Buku Jurnal Edisi 39 Tahun 2020
30. CEILLING siroco fan 100 cmh , 24CDF bh 2,728,000 Buku Jurnal Edisi 39 Tahun 2020

ELBOW & SOCK PIPA


1. elbow pvc 1/2" bh 3,000 Rezeki Lancar Abadi
2. elbow pvc 3/4" bh 3,000 Rezeki Lancar Abadi
3. elbow pvc 1" bh 5,000 Rezeki Lancar Abadi
4. elbow pvc 11/4" bh 8,000 Rezeki Lancar Abadi
5. elbow pvc 11/2" bh 11,000 Rezeki Lancar Abadi
6. elbow pvc 2" bh 16,000 Rezeki Lancar Abadi
7. elbow pvc 3" bh 42,000 Rezeki Lancar Abadi
8. elbow pvc 4" bh 78,000 Rezeki Lancar Abadi
9. elbow pvc 6" bh 195,000 Rezeki Lancar Abadi
10. sock pipa pvc 1/2" bh 2,000 Rezeki Lancar Abadi
11. sock pipa pvc 3/4" bh 3,000 Rezeki Lancar Abadi
12. sock pipa pvc 1" bh 4,000 Rezeki Lancar Abadi
13. sock pipa pvc 1 1/4" bh 6,000 Rezeki Lancar Abadi
14. sock pipa pvc 1 1/2" bh 9,000 Rezeki Lancar Abadi
15. sock pipa pvc 2" bh 13,000 Rezeki Lancar Abadi
16. sock pipa pvc 3" bh 29,000 Rezeki Lancar Abadi
17. sock pipa pvc 4" bh 63,000 Rezeki Lancar Abadi
18. sock pipa pvc 6" bh 131,000 Rezeki Lancar Abadi
PIPA GIP MEDIUM
19. pipa gip medium class 3/4" m' 449,000 Buku Jurnal Edisi 39 Tahun 2020
20. pipa gip medium class 4" m' 2,042,000 Buku Jurnal Edisi 39 Tahun 2020
PIPA BSP CLASS
21. Flange 8 " bh 328,000 Buku Jurnal Edisi 39 Tahun 2020
22. Flange buta 8 " bh 522,000 Buku Jurnal Edisi 39 Tahun 2020
SOCK PIPA GIP
23. sock pipa gip 4" bh 249,000 Buku Jurnal Edisi 39 Tahun 2020
24. spit tembaga 1" bh 311,000 Buku Jurnal Edisi 39 Tahun 2020
25. GROUND ROD DRILLING HEAD dia. 5/8" 89,000 Buku Jurnal Edisi 39 Tahun 2020
26. Copper Rod , Dia 5/ 8 " , panjang 3 meter 108,000 Buku Jurnal Edisi 39 Tahun 2020
27. lem pvc tube 30,000 Buku Jurnal Edisi 39 Tahun 2020
28. seal tape m' 6,000 Buku Jurnal Edisi 39 Tahun 2020
29. Lem besi tube 390,000 Buku Jurnal Edisi 39 Tahun 2020
GATE VALVE
30. gate valve dia 1 " bh 362,000 Buku Jurnal Edisi 39 Tahun 2020
31. gate valve dia 1 1/4" bh 541,000 Buku Jurnal Edisi 39 Tahun 2020
32. gate valve dia 2 " bh 1,578,000 Buku Jurnal Edisi 39 Tahun 2020
33. gate valve dia 1 " Bronze bh 365,000 Buku Jurnal Edisi 39 Tahun 2020
34. gate valve dia 2 " Bronze bh 850,000 Buku Jurnal Edisi 39 Tahun 2020
35. gate valve dia 2 " 16K bh 1,435,000 Buku Jurnal Edisi 39 Tahun 2020
36. gate valve dia 3" bh 105,000 Buku Jurnal Edisi 39 Tahun 2020
37. gate valve dia 4" 16 K bh 2,850,000 Buku Jurnal Edisi 39 Tahun 2020
CHECK VALVE
38. Check valve dia 2" 16 K bh 1,630,000 Buku Jurnal Edisi 39 Tahun 2020
39. Strainer dia 3" bh 1,425,000 Buku Jurnal Edisi 39 Tahun 2020
40. Foot valve dia 2" (50 mm) bh 595,000 Buku Jurnal Edisi 39 Tahun 2020
41. Foot valve dia 3" (80 mm) bh 605,000 Buku Jurnal Edisi 39 Tahun 2020
42. Clean out 3" Stailess bh 364,000 Buku Jurnal Edisi 39 Tahun 2020
43. Clean out 4" Stainless bh 408,000 Buku Jurnal Edisi 39 Tahun 2020
44. Floating valve dia. 2" bh 850,000 Buku Jurnal Edisi 39 Tahun 2020
45. Flexible connection 100 mm bh 875,000 Buku Jurnal Edisi 39 Tahun 2020
46. Flexible connection 150 mm bh 1,905,000 Buku Jurnal Edisi 39 Tahun 2020
44. Y 45 / 3" 89,000 Buku Jurnal Edisi 39 Tahun 2020
45. Y 45 / 4" 74,000 Buku Jurnal Edisi 39 Tahun 2020
46. radar bh 115,000 Buku Jurnal Edisi 39 Tahun 2020
47. Fire extinguisher Type ABC kap 3 kg bh 1,244,000 Buku Jurnal Edisi 39 Tahun 2020
POMPA - POMPA
48. pompa summersible 1,5 PK pk bh 17,800,000 Buku Jurnal Edisi 39 Tahun 2020
49. pompa transfer 200 lpm - head 40 m bh 20,240,000 Buku Jurnal Edisi 39 Tahun 2020
50. pompa transfer 1000 lpm - head 75 m bh 79,240,000 Buku Jurnal Edisi 39 Tahun 2020
Harga Bahan Upah -6
HARGA
SATUAN
NO URAIAN SAT (Rp) KET
51. Pressure Tank 1.000 Lt bh 65,240,000 Buku Jurnal Edisi 39 Tahun 2020
52. Pompa mini booster kapasitas 100 lpm bh 89,200,000 Buku Jurnal Edisi 39 Tahun 2020
53. Pompa Booster bh 38,200,000 INDO MAS
54. klem kabel bh 549 Buku Jurnal Edisi 39 Tahun 2020
55. pipa conduit dia 20 mm bh 6,000 Buku Jurnal Edisi 39 Tahun 2020
56. sock dia.20 mm bh 2,166 Buku Jurnal Edisi 39 Tahun 2020
57. t dus dia. 20 mm bh 10,000 Buku Jurnal Edisi 39 Tahun 2020
58. one way doos bh 10,000 Buku Jurnal Edisi 39 Tahun 2020
59. klem dia.20 mm bh 1,500 Buku Jurnal Edisi 39 Tahun 2020
60. flexible pipa m 1,813 Buku Jurnal Edisi 39 Tahun 2020
61. Isolasi bh 20,000 Buku Jurnal Edisi 39 Tahun 2020
62. inbouw doos bh 1,421 Buku Jurnal Edisi 39 Tahun 2020
63. Lastdop bh 2,010 Buku Jurnal Edisi 39 Tahun 2020
64. Elbow bh 3,269 Buku Jurnal Edisi 39 Tahun 2020
65. Elbow ega bh 1,950 Buku Jurnal Edisi 39 Tahun 2020
TANGKI TORN
66. tangki air kap 5.000 ltr pinguin bh 9,212,000 Buku Jurnal Edisi 39 Tahun 2020

N BAHAN INSTALASI LISTRIK


KABEL - KABEL
1. kabel NYM 4 x 4 mm² m' 51,000 Buku Jurnal Edisi 39 Tahun 2020
2. kabel NYM 4 x 2.5 mm² m' 39,000 Buku Jurnal Edisi 39 Tahun 2020
3. Kabel NYM 3x4 mm² m' 34,195 Buku Jurnal Edisi 39 Tahun 2020
4. Kabel NYM 3x2,5 mm² m' 15,069 Buku Jurnal Edisi 39 Tahun 2020
5. Kabel NYM 2x2,5 mm² m' 12,000 Buku Jurnal Edisi 39 Tahun 2020
6. Kabel NYM 2x1,5 mm² m' 8,191 Buku Jurnal Edisi 39 Tahun 2020
7. Kabel NYR/FGbY 3 X 1.5 m' 33,095 Buku Jurnal Edisi 39 Tahun 2020
8. Kabel NYR/FGbY 3 X 2.5 m' 38,071 Buku Jurnal Edisi 39 Tahun 2020
9. Kabel NYR/FGbY 3 X 4 m' 50,834 Buku Jurnal Edisi 39 Tahun 2020
10. Kabel NYR/FGbY 3 X 6 m' 59,423 Buku Jurnal Edisi 39 Tahun 2020
11. Kabel NYR/FGbY 3 X 10 m' 75,734 Buku Jurnal Edisi 39 Tahun 2020
12. Kabel NYR/FGbY 3 X 16 m' 91,343 Buku Jurnal Edisi 39 Tahun 2020
13. Kabel NYR/FGbY 3 X 25 m' 222,183 Buku Jurnal Edisi 39 Tahun 2020
14. Kabel NYR/FGbY 3 X 35 m' 261,769 Buku Jurnal Edisi 39 Tahun 2020
15. Kabel NYR/FGbY 3 X 50 m' 304,589 Buku Jurnal Edisi 39 Tahun 2020
16. Kabel NYY 3 X 1.5 m' 22,734 Buku Jurnal Edisi 39 Tahun 2020
17. Kabel NYY 3 X 2.5 m' 28,573 Buku Jurnal Edisi 39 Tahun 2020
18. Kabel NYY 3 X 4 m' 38,379 Buku Jurnal Edisi 39 Tahun 2020
19. Kabel NYY 3 X 6 m' 39,720 Buku Jurnal Edisi 39 Tahun 2020
20. Kabel NYY 3 X 10 m' 96,505 Buku Jurnal Edisi 39 Tahun 2020
21. Kabel NYY 3 X 16 m' 126,000 Buku Jurnal Edisi 39 Tahun 2020
22. Kabel NYY 3 X 25 m' 198,000 Buku Jurnal Edisi 39 Tahun 2020
23. Kabel NYY 3 X 35 m' 261,000 Buku Jurnal Edisi 39 Tahun 2020
24. Kabel NYY 3 X 50 m' 319,000 Buku Jurnal Edisi 39 Tahun 2020
25. Kabel NYY 3 X 70 m' 409,282 Buku Jurnal Edisi 39 Tahun 2020
26. Kabel NYY 3 X 95 m' 504,941 Buku Jurnal Edisi 39 Tahun 2020
27. Kabel NYR/FGbY 4 X 1.5 m' 38,447 Buku Jurnal Edisi 39 Tahun 2020
28. Kabel NYR/FGbY 4 X 2.5 m' 47,596 Buku Jurnal Edisi 39 Tahun 2020
29. Kabel NYR/FGbY 4 X 4 m' 61,320 Buku Jurnal Edisi 39 Tahun 2020
30. Kabel NYR/FGbY 4 X 6 m' 75,981 Buku Jurnal Edisi 39 Tahun 2020
31. Kabel NYR/FGbY 4 X 10 m' 97,983 Buku Jurnal Edisi 39 Tahun 2020
32. Kabel NYR/FGbY 4 X 16 m' 220,097 Buku Jurnal Edisi 39 Tahun 2020
33. Kabel NYR/FGbY 4 X 50 m' 620,000 Buku Jurnal Edisi 39 Tahun 2020
34. Kabel NYR/FGbY 4 X 70 m' 744,000 Buku Jurnal Edisi 39 Tahun 2020
35. kabel NYFGBY 4 x 120 mm² m' 2,020,000 Buku Jurnal Edisi 39 Tahun 2020
36. Kabel NYR/FGbY 4 X 300 m' 2,920,000 Buku Jurnal Edisi 39 Tahun 2020
37. Kabel NYY 4 X 1.5 m' 26,497 Buku Jurnal Edisi 39 Tahun 2020
38. Kabel NYY 4 X 2.5 m' 34,615 Buku Jurnal Edisi 39 Tahun 2020
39. Kabel NYY 4 X 4 m' 67,056 Buku Jurnal Edisi 39 Tahun 2020
40. Kabel NYY 4 X 6 m' 81,681 Buku Jurnal Edisi 39 Tahun 2020
41. Kabel NYY 4 X 10 m' 112,902 Buku Jurnal Edisi 39 Tahun 2020
42. Kabel NYY 4 X 16 m' 137,438 Buku Jurnal Edisi 39 Tahun 2020
43. Kabel NYY 4 X 25 m' 254,531 Buku Jurnal Edisi 39 Tahun 2020
44. Kabel NYY 4 X 35 m' 356,500 Buku Jurnal Edisi 39 Tahun 2020
45. kabel NYY 4 x 70 mm² m' 672,000 Buku Jurnal Edisi 39 Tahun 2020
46. kabel NYY 4 x 95 mm² m' 879,000 Buku Jurnal Edisi 39 Tahun 2020
47. kabel NYA 1 x 1,5 mm² m' 3,500 Buku Jurnal Edisi 39 Tahun 2020
48. kabel NYA 1 x 2,5 mm² m' 4,000 Buku Jurnal Edisi 39 Tahun 2020
49. Kabel, NYA 3X(1X2.5mm2) m' 12,000 Buku Jurnal Edisi 39 Tahun 2020
50. Kabel antena TV m' 4,193 Buku Jurnal Edisi 39 Tahun 2020
Harga Bahan Upah -7
HARGA
SATUAN
NO URAIAN SAT (Rp) KET
51. Kabel telepon m' 4,339 Buku Jurnal Edisi 39 Tahun 2020
52. MCB box isi 4 bh 88,031 Buku Jurnal Edisi 39 Tahun 2020
53. MCB 10 A MG bh 67,547 Buku Jurnal Edisi 39 Tahun 2020
54. MCB 6 A MG bh 65,256 Buku Jurnal Edisi 39 Tahun 2020
55. Kotak kontak khusus (KKK) bh 65,117 Buku Jurnal Edisi 39 Tahun 2020
56. Conduit pipa PVC dia ⅝" C m' 3,346 Buku Jurnal Edisi 39 Tahun 2020
57. Tee dos bh 2,448 Buku Jurnal Edisi 39 Tahun 2020
58. Inbow doos bh 1,040 Buku Jurnal Edisi 39 Tahun 2020
59. Sock bh 603 Buku Jurnal Edisi 39 Tahun 2020
60. Klem conduit bh 439 Buku Jurnal Edisi 39 Tahun 2020
61. Lastdop bh 2,344 Buku Jurnal Edisi 39 Tahun 2020
62. Flexible pipe m' 2,226 Buku Jurnal Edisi 39 Tahun 2020
Fhiser bh 100 Buku Jurnal Edisi 39 Tahun 2020
63. Elbow bh 3,229 Buku Jurnal Edisi 39 Tahun 2020
64. Kabel Coaxial RG 10 m' 8,500 Buku Jurnal Edisi 39 Tahun 2020
65. Kabel Coaxial RG 6 m' 6,000 Buku Jurnal Edisi 39 Tahun 2020
66. KWH meter bh 1,300,000 Buku Jurnal Edisi 39 Tahun 2020
Kabel BC
67. Kabel BC 4 mm m' 10,000 Buku Jurnal Edisi 39 Tahun 2020
68. Kabel BC 6 mm m' 21,017 Buku Jurnal Edisi 39 Tahun 2020
69. Kabel BC 10 mm m' 25,500 Buku Jurnal Edisi 39 Tahun 2020
68. Kabel BC 16 mm m' 48,000 Buku Jurnal Edisi 39 Tahun 2020
69. Kabel BC 35mm m' 92,000 Buku Jurnal Edisi 39 Tahun 2020
70. Kabel BC 50 mm m' 109,000 Buku Jurnal Edisi 39 Tahun 2020
71. Kabel BC 70 mm m' 255,000 Buku Jurnal Edisi 39 Tahun 2020
72. Kabel Yellow green 35 mM m' 76,000 Buku Jurnal Edisi 39 Tahun 2020
73. Material Bantu & ACC Grounding m' 364,000 Buku Jurnal Edisi 39 Tahun 2020
KABEL Telephone ITC
74. kabel ITC 30 x 2 x 0,6 mm² m' 90,000 Buku Jurnal Edisi 39 Tahun 2020
75. kabel ITC 30 x 2 x 0,6 mm² m' 90,000 Buku Jurnal Edisi 39 Tahun 2020
KABEL DATA
76. kabel data Cat-6 belden roll 3,135,000 Buku Jurnal Edisi 39 Tahun 2020
77. kabel data Cat-5 belden roll 2,375,000 Buku Jurnal Edisi 39 Tahun 2020
KABEL NYMHY
78. kabel NYMHY 3x1,5 mm2 m' 26,000 Buku Jurnal Edisi 39 Tahun 2020
79. kabel NYMHY 3x2,5 mm2 m' 34,000 Buku Jurnal Edisi 39 Tahun 2020
TELEVISION
80. Outlet TV bh 214,000 Buku Jurnal Edisi 39 Tahun 2020
80. Splitter 4 Way bh 356,000 Buku Jurnal Edisi 39 Tahun 2020
81. Antena UHF 2,386,000 Buku Jurnal Edisi 39 Tahun 2020
82. Supoort Antena 64,000 Buku Jurnal Edisi 39 Tahun 2020
83. Booster IKUSI bh 3,772,000 Buku Jurnal Edisi 39 Tahun 2020
84. Receiver bh 2,386,000 Buku Jurnal Edisi 39 Tahun 2020
85. Transmitter bh 14,686,000 Buku Jurnal Edisi 39 Tahun 2020
86. Rak kabinet bh 564,000 Buku Jurnal Edisi 39 Tahun 2020
87. Master splitter bh 872,000 Buku Jurnal Edisi 39 Tahun 2020
88. TB - MATV bh 504,250 Buku Jurnal Edisi 39 Tahun 2020
PANEL - PANEL
89. Panel P Transfer 9,800,000 Buku Jurnal Edisi 39 Tahun 2020
90. Panel listrik SDP bh 343,200,000 Buku Jurnal Edisi 39 Tahun 2020
91. Panel listrik LP/PP bh 115,896,000 Buku Jurnal Edisi 39 Tahun 2020
92. Testing Commssioning ls 8,000,000 Buku Jurnal Edisi 39 Tahun 2020
DUCTING & GRILE AC
93. Ami metalizing m' 10,000 Buku Jurnal Edisi 39 Tahun 2020
94. Bolt & Nut m' 8,000 Buku Jurnal Edisi 39 Tahun 2020
95. corner m' 22,000 Buku Jurnal Edisi 39 Tahun 2020
96. Duct tape m' 25,000 Buku Jurnal Edisi 39 Tahun 2020
97. Glass wool m' 32,000 Buku Jurnal Edisi 39 Tahun 2020
98. Hanger/gantungan m' 22,000 Buku Jurnal Edisi 39 Tahun 2020
99. Packing m' 88,000 Buku Jurnal Edisi 39 Tahun 2020
100. Plincote m' 202,000 Buku Jurnal Edisi 39 Tahun 2020
101. Aluminium foil dens. 120 m' 18,000 Buku Jurnal Edisi 39 Tahun 2020
102. seng plat BJLS 80 m' 325,000 Buku Jurnal Edisi 39 Tahun 2020
103. EAL 30" m' 792,000 Buku Jurnal Edisi 39 Tahun 2020
LAMPU
104. DL reflector 6 W bh 364,000 Buku Jurnal Edisi 39 Tahun 2020
105. DL reflector 6 W + nicad bh 1,332,000 Buku Jurnal Edisi 39 Tahun 2020
106. DL cover susu 6 W bh 375,000 Buku Jurnal Edisi 39 Tahun 2020
107. DL cover susu 6 W + nicad bh 1,393,000 Buku Jurnal Edisi 39 Tahun 2020
108. DL 18 W bh 227,500 Buku Jurnal Edisi 39 Tahun 2020
Harga Bahan Upah -8
HARGA
SATUAN
NO URAIAN SAT (Rp) KET
109. DL 18 W + NICAD bh 975,500 Buku Jurnal Edisi 39 Tahun 2020
110. Lampu TL led T8 16 Watt setara Philip bh 110,000 Buku Jurnal Edisi 39 Tahun 2020
111. Lampu LED Downlight 11 watt bh 100,000 Buku Jurnal Edisi 39 Tahun 2020
112. Lampu Spotlight bh 105,000 Buku Jurnal Edisi 39 Tahun 2020
113. Lampu TKO led 1 x 36 watt bh 415,500 Buku Jurnal Edisi 39 Tahun 2020
114. Lampu TKO led 1 x 36 watt nicad bh 955,500 Buku Jurnal Edisi 39 Tahun 2020
115. Lampu plafon outbow LED dia. 40cm 5 watt bh 654,000 Buku Jurnal Edisi 39 Tahun 2020
116. Lampu plafon outbow LED dia. 40cm 5 watt + Nicad bh 1,622,000 Buku Jurnal Edisi 39 Tahun 2020
117. Lampu RML (M1) 2 x 10 W LED T5 bh 1,455,000 Buku Jurnal Edisi 39 Tahun 2020
118. Lampu RML (M1) 2 x 10 W LED T5 + nicad bh 2,423,000 Buku Jurnal Edisi 39 Tahun 2020
119. Lampu spot led 3 w bh 225,000 Buku Jurnal Edisi 39 Tahun 2020
120. Lampu Tangga bh 320,000 Buku Jurnal Edisi 39 Tahun 2020
121. Lampu Ceilling Cassete bh 1,120,000 Buku Jurnal Edisi 39 Tahun 2020
122. Lampu strip LED warm light 15watt/meter + power supply bh 293,000 Buku Jurnal Edisi 39 Tahun 2020
123. Lampu baret indoor kotak outbow LED 5 watt + NICAD bh 1,824,000 Buku Jurnal Edisi 39 Tahun 2020
124. Lampu Baret 36 W Nicad bh 985,000 Buku Jurnal Edisi 39 Tahun 2020
125. Lampu Taman bolar bh 475,000 Buku Jurnal Edisi 39 Tahun 2020
126. Lampu sorot flood light 100 w bh 2,250,000 Buku Jurnal Edisi 39 Tahun 2020
127. Lampu led pju light 40 w bh 2,450,000 Buku Jurnal Edisi 39 Tahun 2020
128. Lampu Gantung bh 5,850,000 Buku Jurnal Edisi 39 Tahun 2020
129. Lampu Dinding bh 485,000 Buku Jurnal Edisi 39 Tahun 2020
130. Lampu Exit bh 1,375,000 Buku Jurnal Edisi 39 Tahun 2020
131. Lampu wastafel led 3 w bh 137,500 Buku Jurnal Edisi 39 Tahun 2020
132. Lampu LED ROLL + PSU bh 147,000 Buku Jurnal Edisi 39 Tahun 2020
133. Lampu PJU LED 50 W + MCB BOX bh 6,785,000 Buku Jurnal Edisi 39 Tahun 2020
134. Tiang Lampu T-9m bh 6,775,000 Buku Jurnal Edisi 39 Tahun 2020
SAKLAR & STOP KONTAK
135. Stop kontak bh 78,000 Buku Jurnal Edisi 39 Tahun 2020
136. saklar ganda bh 58,000 Buku Jurnal Edisi 39 Tahun 2020
137. saklar tunggal bh 42,000 Buku Jurnal Edisi 39 Tahun 2020
138. Saklar Ganda Tukar bh 42,000 Buku Jurnal Edisi 39 Tahun 2020
139. Saklar hotel bh 64,000 Buku Jurnal Edisi 39 Tahun 2020
140. Grid Switch 3 Gang clipsal ET34/2/3A bh 110,000 Buku Jurnal Edisi 39 Tahun 2020
141. Grid Switch 7 Gang clipsal ET36/2/3A bh 386,000 Buku Jurnal Edisi 39 Tahun 2020
142. MCB 1 Phase , 6 Amp bh 75,000 Buku Jurnal Edisi 39 Tahun 2020
PENANGKAL PETIR
143. Penangkal petir elektrostatik R = 150 bh 16,060,000 Buku Jurnal Edisi 39 Tahun 2020
144. Pole Support + dudukan bh 2,200,000 Buku Jurnal Edisi 39 Tahun 2020
145. Loop (rod - rod) BC 70 mmmm bh 1,672,000 Buku Jurnal Edisi 39 Tahun 2020
146. Air terminal
Tiang 16x600mm,
penangkal solid copper stell c/w support
petir + dudukan bh 1,250,000 Buku Jurnal Edisi 39 Tahun 2020
147. Ground
base air electrode
terminal solid copper clad steel 3/4" x 3 mtr (19 bh 720,000 Buku Jurnal Edisi 39 Tahun 2020
148. Grounding
x 3000mm)rod 14mm x 1500mm with tinned copper bh 507,600 Buku Jurnal Edisi 39 Tahun 2020
149. conductor bh 165,600 Buku Jurnal Edisi 39 Tahun 2020
150. Conductor bonding connector c-type bh 17,280 Buku Jurnal Edisi 39 Tahun 2020
151. Grounding rod clamp for 70mm2 bh 113,760 Buku Jurnal Edisi 39 Tahun 2020
152. Unistrut chanel 41x41x2.5x3 m bh 259,200 Buku Jurnal Edisi 39 Tahun 2020
153. Copper plate 1mx1mx3mm, tinned copper conductor bh 1,371,600 Buku Jurnal Edisi 39 Tahun 2020
154. compression type cable connector bh 8,640 Buku Jurnal Edisi 39 Tahun 2020
155. bak kontrol grounding 40x40 cm bh 800,000 Buku Jurnal Edisi 39 Tahun 2020

TELEPONE
147. TB Telp - 30 pairs (2 crown) bh 416,000 Buku Jurnal Edisi 39 Tahun 2020
148. Outlet Telephone bh 52,000 Buku Jurnal Edisi 39 Tahun 2020
149. kabel ITC 2 x 2 x 0,6 mm² bh 3,500 Buku Jurnal Edisi 39 Tahun 2020
PERANGKAT PANEL SURYA
150. Panel Surya 120 wp bh 2,450,000 Buku Jurnal Edisi 39 Tahun 2020
151. baterry panel surya 12v 120 AH bh 2,775,000 Buku Jurnal Edisi 39 Tahun 2020
152. baterry panel surya 12v 200 AH bh 4,325,000 Buku Jurnal Edisi 39 Tahun 2020
153. box Baterry Panel surya bh 650,000 Buku Jurnal Edisi 39 Tahun 2020
154. box Baterry Panel surya cap 2 baterry bh 950,000 Buku Jurnal Edisi 39 Tahun 2020
155. Controler Panel surya bh 447,000 Buku Jurnal Edisi 39 Tahun 2020
156. Connector Panel surya bh 67,000 Buku Jurnal Edisi 39 Tahun 2020
157. dudukan panel surya bh 347,000 Buku Jurnal Edisi 39 Tahun 2020
158. photocell bh 155,000 Buku Jurnal Edisi 39 Tahun 2020
DATA
150. Wifi Router ASUS AC1900 bh 6,160,000 Buku Jurnal Edisi 39 Tahun 2020
151. Modular Jack Cat 5e bh 84,000 Buku Jurnal Edisi 39 Tahun 2020
152. Outlet LAN data type wall mounted bh 71,500 Buku Jurnal Edisi 39 Tahun 2020
153. Face Plate 1 Port data RJ 45 cat 6 bh 132,000 Buku Jurnal Edisi 39 Tahun 2020
CCTV/IP CAMERA
Harga Bahan Upah -9
HARGA
SATUAN
NO URAIAN SAT (Rp) KET
154. IP Camera
155. NVR camera plus booster (5 Camera) bh 4,850,000 Buku Jurnal Edisi 39 Tahun 2020
156. Divar 16 channel bh 12,950,000 Buku Jurnal Edisi 39 Tahun 2020
157. BNC bh 12,500 Buku Jurnal Edisi 39 Tahun 2020
158. Dome Camera Moving unit 3,000,000 Buku Jurnal Edisi 39 Tahun 2020
159. Monitor 40" unit 5,000,000 Buku Jurnal Edisi 39 Tahun 2020
160. Kabel Coaxial RG 10 m1 6,500 Buku Jurnal Edisi 39 Tahun 2020
161. kabel NYMHY 2x1,5 mm2 m1 5,850 Buku Jurnal Edisi 39 Tahun 2020
TATA SUARA
162. Terminal box panel TS bh 264,000 Buku Jurnal Edisi 39 Tahun 2020
163. inbouw doos Volume control bh 38,000 Buku Jurnal Edisi 39 Tahun 2020
164. Volume control bh 197,000 Buku Jurnal Edisi 39 Tahun 2020
165. Ceiling speaker bh 149,000 Buku Jurnal Edisi 39 Tahun 2020
Fan
166. SAG 500 x 500 bh 2,675,000 Buku Jurnal Edisi 39 Tahun 2020
167. RAG 500 x 500 bh 1,320,000 Buku Jurnal Edisi 39 Tahun 2020
168. FAG 300 x 300 bh 720,000 Buku Jurnal Edisi 39 Tahun 2020
168. Flexible round duct dia. 6" bh 101,000 Buku Jurnal Edisi 39 Tahun 2020
169. Flexible round duct dia. 16" bh 343,000 Buku Jurnal Edisi 39 Tahun 2020
170. Plenum Box Supply dan Return 45.4" x 80.8" x 46.8" (H x bh 4,664,000 Buku Jurnal Edisi 39 Tahun 2020
171. Spigot damper bh 220,000 Buku Jurnal Edisi 39 Tahun 2020
172. ceilling exh. Fan bh 1,000,000 Buku Jurnal Edisi 39 Tahun 2020
173. Propeller Fan bh 235,000 Buku Jurnal Edisi 39 Tahun 2020
KABEL TRAY/ LADDER
174. Jointing lader W 100 unit 37,000 Buku Jurnal Edisi 39 Tahun 2020
175. ladder 600 X 100 mm unit 712,000 Buku Jurnal Edisi 39 Tahun 2020
176. Straight reducer Ladder W- 600 x 100 unit 999,000 Buku Jurnal Edisi 39 Tahun 2020
177. outside Ladeder W- 600 x 100 unit 559,000 Buku Jurnal Edisi 39 Tahun 2020
178. Elbow Tray W- 600 x 100 unit 674,000 Buku Jurnal Edisi 39 Tahun 2020
179. ladder U 400 X 100 mm unit 710,000 Buku Jurnal Edisi 39 Tahun 2020
180. Straight reducer Ladder U- 400 x 100 unit 853,000 Buku Jurnal Edisi 39 Tahun 2020
181. outside Ladeder U - 400 x 100 unit 501,000 Buku Jurnal Edisi 39 Tahun 2020
182. Elbow Ladder5 U - 400 x 100 unit 616,000 Buku Jurnal Edisi 39 Tahun 2020
183. Hanger beam unit 79,000 Buku Jurnal Edisi 39 Tahun 2020
184. Hanger Rood unit 114,000 Buku Jurnal Edisi 39 Tahun 2020
FIRE ALARM
185. Terminal box FA bh 672,000 Buku Jurnal Edisi 39 Tahun 2020
186. R.O.R heat detector bh 284,000 Buku Jurnal Edisi 39 Tahun 2020
187. Patch panel 100 ch / AMP bh 5,150,000 Buku Jurnal Edisi 39 Tahun 2020
188. Wall mount 19"/12 U / ABBA 12 U bh 28,000,000 Buku Jurnal Edisi 39 Tahun 2020
189. Photo electric Smoke Detector bh 510,000 Buku Jurnal Edisi 39 Tahun 2020
190. Manual call point bh 628,000 Buku Jurnal Edisi 39 Tahun 2020
191. Terminal box action set fire alarm bh 804,000 Buku Jurnal Edisi 39 Tahun 2020
192. Fixed Temperature heat detector bh 95,500 Buku Jurnal Edisi 39 Tahun 2020
193. Alarm Bell bh 320,000 Buku Jurnal Edisi 39 Tahun 2020
194. MCFA 10 Zone bh 27,280,000 Buku Jurnal Edisi 39 Tahun 2020
195. Indicator lamp bh 50,000 Buku Jurnal Edisi 39 Tahun 2020
HYDRANT
196. dynabolt 8 mm bh 2,000 Buku Jurnal Edisi 39 Tahun 2020
197. Besi siku 50 x 50 x 5 bh 21,000 Buku Jurnal Edisi 39 Tahun 2020
O LAIN-LAIN
1. Panel beton pracetak 50x400x2130 Lbr 110,000 Buku Jurnal Edisi 39 Tahun 2020
2. Kolom beton pracetak t = 2750 mm btg 170,000 Buku Jurnal Edisi 39 Tahun 2020
3. Bensin Ltr 7,750 Buku Jurnal Edisi 39 Tahun 2020
4. Solar subsidi Ltr 6,500 Buku Jurnal Edisi 39 Tahun 2020
5. Solar Ltr 8,400 Buku Jurnal Edisi 39 Tahun 2020
6. Minyak tanah Ltr 11,000 Buku Jurnal Edisi 39 Tahun 2020
7. Pelumas Ltr 10,500 Buku Jurnal Edisi 39 Tahun 2020
8. Aspal kg 8,750 Buku Jurnal Edisi 39 Tahun 2020
9. Semen untuk Filler hotmix kg 14,610 Buku Jurnal Edisi 39 Tahun 2020
10. Pompa air listrik Shimizu 125 W unit 855,000 Buku Jurnal Edisi 39 Tahun 2020
11. Pompa air listrik Shimizu 750 W unit 9,600,000 Buku Jurnal Edisi 39 Tahun 2020
12. bentonite kg 18,000 Buku Jurnal Edisi 39 Tahun 2020
13. APAR/APAB 50 kg unit 24,500,000 Buku Jurnal Edisi 39 Tahun 2020

Harga Bahan Upah -10


HARGA
SATUAN
NO URAIAN SAT (Rp) KET
14. Air Ltr 515 Buku Jurnal Edisi 39 Tahun 2020
P PEKERJAAN LAPISAN HOTMIX , LANDSCAPE
1. Hotmix 97-100% 2,3 ton/m3 tebal 3 cm m² 99,468 Buku Jurnal Edisi 39 Tahun 2020
2. Hotmix 97-100% 2,3 ton/m3 tebal 5 cm m² 164,073 Buku Jurnal Edisi 39 Tahun 2020
3. Pohon perdu BH 250,000 Buku Jurnal Edisi 39 Tahun 2020
4. Rumput gajah mini m² 20,000 Buku Jurnal Edisi 39 Tahun 2020
5. Tiang Pipa galvanis dia 2 TP 225 " bh 397,500 Buku Jurnal Edisi 39 Tahun 2020
6. Pagar BRC dia 8 mm tinggi 175 cm m1 448,750 Buku Jurnal Edisi 39 Tahun 2020
7. Mur baut Diameter 6 mm bh 500 Buku Jurnal Edisi 39 Tahun 2020
8. Rell, roda Pagar BRC bh 525,000 Buku Jurnal Edisi 39 Tahun 2020
9. Kawat Berduri Brzinal 2000 m1 4,485 Buku Jurnal Edisi 39 Tahun 2020

II. HARGA PERALATAN BARU (sebagai dasar perhitungan sewa alat)


1. Buildozer 100 HP /Jam 1,232,000 Buku Jurnal Edisi 39 Tahun 2020
2. Buildozer 65 HP /Jam 878,000 Buku Jurnal Edisi 39 Tahun 2020
3. Motor greader 115 Hp /Jam 902,000 Buku Jurnal Edisi 39 Tahun 2020
4. Genset + Stone Cruseher 140 HP /Jam 1,727,000 Buku Jurnal Edisi 39 Tahun 2020
5. Genset + Stone Cruseher 95 HP /Jam 1,485,000 Buku Jurnal Edisi 39 Tahun 2020
6. Genset + Stone Cruseher 15 HP /Jam 1,245,000 Buku Jurnal Edisi 39 Tahun 2020
7. Sreen plant 80 HP /Jam 455,000 Buku Jurnal Edisi 39 Tahun 2020
8. Loader wheelled 115 HP /Jam 567,000 Buku Jurnal Edisi 39 Tahun 2020
9. Three wheel roller 51 HP /Jam 386,000 Buku Jurnal Edisi 39 Tahun 2020
10. Tandem Roller 40 HP /Jam 390,000 Buku Jurnal Edisi 39 Tahun 2020
11. Vibrator Roller 35 HP /Jam 295,000 Buku Jurnal Edisi 39 Tahun 2020
12. Pnematic tire roller 95 HP /Jam 468,000 Buku Jurnal Edisi 39 Tahun 2020
13. Vibrator Roller 7 HP /Jam 78,000 Buku Jurnal Edisi 39 Tahun 2020
14. Vibro Plate Tamper 4 HP /Jam 19,000 Buku Jurnal Edisi 39 Tahun 2020
15. Concrete Vibrator 4 HP /Jam 23,000 Buku Jurnal Edisi 39 Tahun 2020
16. Asphal spayer / Distributor 38 HP /Jam 164,000 Buku Jurnal Edisi 39 Tahun 2020
17. Asphal spayer / Distributor 7 HP /Jam 40,000 Buku Jurnal Edisi 39 Tahun 2020
18. Asphal spayer / Distributor 4 HP /Jam 302,000 Buku Jurnal Edisi 39 Tahun 2020
19. Genset + Asphal mixing Plant 125 HP /Jam 3,486,000 Buku Jurnal Edisi 39 Tahun 2020
20. Genset + Asphal mixing Plant 50 HP /Jam 2,731,000 Buku Jurnal Edisi 39 Tahun 2020
21. Asphal Finisher 30 HP /Jam 694,000 Buku Jurnal Edisi 39 Tahun 2020
22. Water Tank truk 115 HP /Jam 387,000 Buku Jurnal Edisi 39 Tahun 2020
23. Dump truk 3.5 ton 106 HP /Jam 349,000 Buku Jurnal Edisi 39 Tahun 2020
24. Dump truk 8 ton 175 HP /Jam 555,000 Buku Jurnal Edisi 39 Tahun 2020
25. Dump truk 5 ton 145 HP /Jam 464,000 Buku Jurnal Edisi 39 Tahun 2020
26. Plat bed truck 3.5 ton, 80 HP /Jam 263,000 Buku Jurnal Edisi 39 Tahun 2020
27. Concrete mixer 4 HP /Jam 29,000 Buku Jurnal Edisi 39 Tahun 2020
28. Concrete mixer 10 HP /Jam 90,000 Buku Jurnal Edisi 39 Tahun 2020
29. Concrete mixer 7 HP /Jam 160,000 Buku Jurnal Edisi 39 Tahun 2020
30. Air Compresor 20 HP /Jam 85,000 Buku Jurnal Edisi 39 Tahun 2020
31. Water pump 8 HP /Jam 30,000 Buku Jurnal Edisi 39 Tahun 2020
32. Water pump 10 HP /Jam 38,000 Buku Jurnal Edisi 39 Tahun 2020
33. Exsavator 80 HP /Jam 456,300 Buku Jurnal Edisi 39 Tahun 2020
1. Air Compressor /Jam 194,933 Buku Jurnal Edisi 39 Tahun 2020
2. Alat Las /Jam 124,895 Buku Jurnal Edisi 39 Tahun 2020
3. Beton Molen 400 Ltr /Jam 140,500 Buku Jurnal Edisi 39 Tahun 2020
4. Beton Triller /Jam 354,359 Buku Jurnal Edisi 39 Tahun 2020
5. Buldozer /Jam 878,000 Buku Jurnal Edisi 39 Tahun 2020
6. Dump Truck Mitsubishi /Jam 385,000 Buku Jurnal Edisi 39 Tahun 2020
7. Excavator Hitachi /Jam 862,000 Buku Jurnal Edisi 39 Tahun 2020
8. Flat bed truck /Jam 263,000 Buku Jurnal Edisi 39 Tahun 2020
9. Genset /Jam 1,245,000 Buku Jurnal Edisi 39 Tahun 2020
10. Jack Hummer /Jam 33,721 Buku Jurnal Edisi 39 Tahun 2020
11. Mesin gilas /Jam 231,000 Buku Jurnal Edisi 39 Tahun 2020
12. Mesin poles /Hr 112,000 Buku Jurnal Edisi 39 Tahun 2020
13. Mixer /Hr 52,600 Buku Jurnal Edisi 39 Tahun 2020
14. Motor Grader /Jam 902,000 Buku Jurnal Edisi 39 Tahun 2020
15. Paving Finisher /Jam 257,500 Buku Jurnal Edisi 39 Tahun 2020
16. Pneumatic Tired Roller /Jam 358,200 Buku Jurnal Edisi 39 Tahun 2020
17. Rail /Jam 39,100 Buku Jurnal Edisi 39 Tahun 2020
18. Side Form /Jam 63,800 Buku Jurnal Edisi 39 Tahun 2020
19. Sprayer /Hr 44,900 Buku Jurnal Edisi 39 Tahun 2020
20. Stamper /Jam 28,000 Buku Jurnal Edisi 39 Tahun 2020
21. Stone Crusher /Jam 822,600 Buku Jurnal Edisi 39 Tahun 2020
22. Truck Mixer /Jam 280,400 Buku Jurnal Edisi 39 Tahun 2020
23. Truk penarik /Jam 84,100 Buku Jurnal Edisi 39 Tahun 2020
24. Vibrator /Jam 23,000 Buku Jurnal Edisi 39 Tahun 2020
Harga Bahan Upah -11
HARGA
SATUAN
NO URAIAN SAT (Rp) KET
25. Vibro Compactor/Vibratory Roller 6-8 T /Jam 468,000 Buku Jurnal Edisi 39 Tahun 2020
26. Water Tank Truck /Jam 287,918 Buku Jurnal Edisi 39 Tahun 2020
27. Wheel Loader /Jam 332,800 Buku Jurnal Edisi 39 Tahun 2020
28. Whell crane /Jam 1,320,500 Buku Jurnal Edisi 39 Tahun 2020
29. Stone breaker /Jam 381,000 Buku Jurnal Edisi 39 Tahun 2020
30. Tendem roller /Jam 390,000 Buku Jurnal Edisi 39 Tahun 2020
31. Ponton pancang /Jam 2,081,000 Buku Jurnal Edisi 39 Tahun 2020
32. Ponton langsir /Jam 1,445,000 Buku Jurnal Edisi 39 Tahun 2020
33. Mobile Crane pancang /hari 1,650,000 Buku Jurnal Edisi 39 Tahun 2020
34. Mobile Crane langsir /Jam 323,000 Buku Jurnal Edisi 39 Tahun 2020
35. Drop hammer Pancang /hari 168,200 Buku Jurnal Edisi 39 Tahun 2020
36. Crane Service /hari 105,000 Buku Jurnal Edisi 39 Tahun 2020
37. MOTOR GRADER 125 HP /Jam 950,000 Buku Jurnal Edisi 39 Tahun 2020
38. VIBRATING ROLLER 6-8 TON /Jam 468,000 Buku Jurnal Edisi 39 Tahun 2020
39. WHEEL LOADER 1,0-1,6 M3 /Jam 332,800 Buku Jurnal Edisi 39 Tahun 2020
40. DUMP TRUCK 3,5 TON /Jam 385,000 Buku Jurnal Edisi 39 Tahun 2020
41. TANDEM ROLLER 6-8 TON /Jam 390,000 Buku Jurnal Edisi 39 Tahun 2020
42. WATER TANK TRUCK 3000-4500 L /Jam 287,918 Buku Jurnal Edisi 39 Tahun 2020
43. ASPHALT DISTRIBUTOR /Jam 275,000 Buku Jurnal Edisi 39 Tahun 2020
44. AIR COMPRESSOR /Jam 194,933 Buku Jurnal Edisi 39 Tahun 2020
45. DUMP TRUCK 10 TON /Jam 450,000 Buku Jurnal Edisi 39 Tahun 2020
46. THREE WHEEL ROLLER 8-10 TON /Jam 475,000 Buku Jurnal Edisi 39 Tahun 2020
47. ASPHALT SPRAYER /Jam 250,000 Buku Jurnal Edisi 39 Tahun 2020

III. UPAH TENAGA


1. Pekerja OH 100,000 Buku Jurnal Edisi 39 Tahun 2020
2. Tukang gali OH 150,000 Buku Jurnal Edisi 39 Tahun 2020
3. Tukang kayu OH 150,000 Buku Jurnal Edisi 39 Tahun 2020
4. Tukang batu OH 150,000 Buku Jurnal Edisi 39 Tahun 2020
5. Tukang besi OH 150,000 Buku Jurnal Edisi 39 Tahun 2020
6. Tukang las OH 150,000 Buku Jurnal Edisi 39 Tahun 2020
7. Tukang cat OH 150,000 Buku Jurnal Edisi 39 Tahun 2020
8. Tukang alumunium OH 150,000 Buku Jurnal Edisi 39 Tahun 2020
9. Tukang gypsum OH 150,000 Buku Jurnal Edisi 39 Tahun 2020
10. Tukang pasang pipa OH 150,000 Buku Jurnal Edisi 39 Tahun 2020
11. Tukang pasang listrik OH 150,000 Buku Jurnal Edisi 39 Tahun 2020
12. Tukang aspal OH 150,000 Buku Jurnal Edisi 39 Tahun 2020
13. Kepala tukang OH 180,000 Buku Jurnal Edisi 39 Tahun 2020
14. Kepala tukang pasang pipa OH 180,000 Buku Jurnal Edisi 39 Tahun 2020
15. Kepala tukang pasang listrik OH 180,000 Buku Jurnal Edisi 39 Tahun 2020
16. Surveyor OH 180,000 Buku Jurnal Edisi 39 Tahun 2020
17. Instalator OH 180,000 Buku Jurnal Edisi 39 Tahun 2020
18. Operator alat berat OH 170,000 Buku Jurnal Edisi 39 Tahun 2020
19. Pembantu operator alat berat OH 110,000 Buku Jurnal Edisi 39 Tahun 2020
20. Mandor OH 200,000 Buku Jurnal Edisi 39 Tahun 2020

Q Tambahan
1. Oksigen (tabung) tabung 1,360,000 Buku Jurnal Edisi 39 Tahun 2020
2. Elpiji / oksigen ls 500 Buku Jurnal Edisi 39 Tahun 2020
3. Acetelin @ 15 kg tabung 2,400,000 Buku Jurnal Edisi 39 Tahun 2020
4. Agegat Pecah Mesin 20 - 30 mm m3 360,000 Buku Jurnal Edisi 39 Tahun 2020
5. Wiring Ls 4,500 Buku Jurnal Edisi 39 Tahun 2020
6. Lampu Downlight LED 11 Watt bh 90,000 Buku Jurnal Edisi 39 Tahun 2020
7. Concrete Aggregate 10mm - 20mm m3 570,000 Buku Jurnal Edisi 39 Tahun 2020
8. Kaso 5/7 batang 232,000 Buku Jurnal Edisi 39 Tahun 2020
9. Plafon asbes 3mm kg 22,750 Buku Jurnal Edisi 39 Tahun 2020
10. asbes gelombang lembar 81,000 Buku Jurnal Edisi 39 Tahun 2020
11. paku asbes kg 139,000 Buku Jurnal Edisi 39 Tahun 2020
12. Pintu Rangka Kayu (double teakwood) bh 1,596,000 Buku Jurnal Edisi 39 Tahun 2020
13. Pembantu Surveyor oh 80,000 Buku Jurnal Edisi 39 Tahun 2020
14. Operasional Crawel Crane (Hari) hari 8,448,000 Buku Jurnal Edisi 39 Tahun 2020
15. Operasional Ponton Transport (Hari) hari 41,066,667 Buku Jurnal Edisi 39 Tahun 2020
16. Sekretaris ob 1,280,000 Buku Jurnal Edisi 39 Tahun 2020
17. Album Foto eksemplar 100,000 Buku Jurnal Edisi 39 Tahun 2020
18. As Built Drawing eksemplar 300,000 Buku Jurnal Edisi 39 Tahun 2020
19. Laporan Bulanan eksemplar 100,000 Buku Jurnal Edisi 39 Tahun 2020
20. Laporan Harian eksemplar 100,000 Buku Jurnal Edisi 39 Tahun 2020
21. Laporan Mingguan eksemplar 100,000 Buku Jurnal Edisi 39 Tahun 2020
22. Alat Tulis Kantor bulan 100,000 Buku Jurnal Edisi 39 Tahun 2020
Harga Bahan Upah -12
HARGA
SATUAN
NO URAIAN SAT (Rp) KET
23. Biaya Komunikasi/dokumentasi bulan 500,000 Buku Jurnal Edisi 39 Tahun 2020
24. Tiang Pancang 50 x 50 panjang 6 meter m1 475,000 Buku Jurnal Edisi 39 Tahun 2020
25. Exhaust Fan Plafond buah 712,500 Buku Jurnal Edisi 39 Tahun 2020
26. Exhaust Fan Dinding buah 861,000 Buku Jurnal Edisi 39 Tahun 2020
27. Kipas Angin 18" buah 1,045,500 Buku Jurnal Edisi 39 Tahun 2020
28. Engsel pintu 4" Dekson Stainless buah 38,141 Buku Jurnal Edisi 39 Tahun 2020
29. Engsel jendela 3" Dekson Stainless buah 32,520 Buku Jurnal Edisi 39 Tahun 2020
30. Lever Handle + Mortise + Cylinder set 394,625 Buku Jurnal Edisi 39 Tahun 2020
31. Pull Handle PH SQ DL801 35 CM pasang 461,250 Buku Jurnal Edisi 39 Tahun 2020
32. Besi hollow 40x40x2 mm batang 322,242 Buku Jurnal Edisi 39 Tahun 2020
33. Besi hollow 40.40.2 mm m' 27,000 Buku Jurnal Edisi 39 Tahun 2020
34. Besi hollow 40x40x0.8 mm m' 18,480 Buku Jurnal Edisi 39 Tahun 2020
35. Ongkos Pengiriman Jakarta - Tanjung Pinang m' 474,050 Buku Jurnal Edisi 39 Tahun 2020
36. safty shoes bh 627,300 Buku Jurnal Edisi 39 Tahun 2020
37. safty helm bh 69,700 Buku Jurnal Edisi 39 Tahun 2020
38. safty glass bh 54,200 Buku Jurnal Edisi 39 Tahun 2020
39. Hearing Protection bh 205,700 Buku Jurnal Edisi 39 Tahun 2020
40. Life Jacket bh 327,000 Buku Jurnal Edisi 39 Tahun 2020
41. Sewa Total Station /hari 250,000 Buku Jurnal Edisi 39 Tahun 2020
42. Sewa Water Pass /hari 250,000 Buku Jurnal Edisi 39 Tahun 2020
43. Sewa Komputer dan Printer bln 2,500,000 Buku Jurnal Edisi 39 Tahun 2020
44. Sewa Meja dan kursi kerja bln 1,750,000 Buku Jurnal Edisi 39 Tahun 2020
45. Sewa Meja dan kursi rapat bln 2,500,000 Buku Jurnal Edisi 39 Tahun 2020
46. Sewa AC bln 600,000 Buku Jurnal Edisi 39 Tahun 2020
47. Sewa Filling cabinet bln 250,000 Buku Jurnal Edisi 39 Tahun 2020
48. Sewa White board bln 100,000 Buku Jurnal Edisi 39 Tahun 2020
49. Kaca Louver m2 650,000 Buku Jurnal Edisi 39 Tahun 2020
50. Pintu Kamar Mandi Alumunium unit 650,000 Buku Jurnal Edisi 39 Tahun 2020
51. Genset bh 160,000,000 Buku Jurnal Edisi 39 Tahun 2020

Harga Bahan Upah -13


DAFTAR PERALATAN
PEKERJAAN : RAB DED Sisi Darat Pelabuhan Tanjung Moco
LOKASI : DERMAGA MOCO, TANJUNG PINANG
TAHUN ANGGARAN 2020

DAFTAR HARGA PERALATAN


NO. SATUAN HARGA SEWA
1. Buildozer 100 HP /Jam 1,232,000.00
2. Buildozer 65 HP /Jam 878,000.00
3. Motor greader 115 Hp /Jam 902,000.00
4. Genset + Stone Cruseher 140 HP /Jam 1,727,000.00
5. Genset + Stone Cruseher 95 HP /Jam 1,485,000.00
6. Genset + Stone Cruseher 15 HP /Jam 1,245,000.00
7. Sreen plant 80 HP /Jam 455,000.00
8. Loader wheelled 115 HP /Jam 567,000.00
9. Three wheel roller 51 HP /Jam 386,000.00
10. Tandem Roller 40 HP /Jam 390,000.00
11. Vibrator Roller /Jam 600,000.00
12. Pnematic tire roller 95 HP /Jam 468,000.00
13. Vibrator Roller 7 HP /Jam 78,000.00
14. Vibro Plate Tamper 4 HP /Jam 19,000.00
15. Concrete Vibrator 4 HP /Jam 23,000.00
16. Asphal spayer / Distributor 38 HP /Jam 164,000.00
17. Asphal spayer / Distributor 7 HP /Jam 40,000.00
18. Asphal spayer / Distributor 4 HP /Jam 302,000.00
19. Genset + Asphal mixing Plant 125 HP /Jam 3,486,000.00
20. Genset + Asphal mixing Plant 50 HP /Jam 2,731,000.00
21. Asphal Finisher 30 HP /Jam 694,000.00
22. Water Tank truk 115 HP /Jam 387,000.00
23. Dump truk 3.5 ton 106 HP /Jam 349,000.00
24. Dump truk 8 ton 175 HP /Jam 555,000.00
25. Dump truk 5 ton 145 HP /Jam 464,000.00
26. Plat bed truck 3.5 ton, 80 HP /Jam 263,000.00
27. Concrete mixer 4 HP /Jam 29,000.00
28. Concrete mixer 10 HP /Jam 90,000.00
29. Concrete mixer 7 HP /Jam 160,000.00
30. Air Compresor 20 HP /Jam 85,000.00
31. Water pump 8 HP /Jam 30,000.00
32. Water pump 10 HP /Jam 38,000.00
33. Exsavator 80 HP /Jam 862,000.00
34. Air Compressor /Jam 194,933.00
35. Alat Las /Jam 124,895.00
36. Beton Molen 400 Ltr /Jam 140,500.00
37. Beton Triller /Jam 354,359.00
38. Buldozer (65hp) /Jam 878,000.00
39. Dump Truck Mitsubishi /Jam 385,000.00
40. Excavator Hitachi (80hp) /Jam 862,000.00
41. Flat bed truck(80 hp) /Jam 263,000.00
42. Genset (95 hp) /Jam 124,500.00
43. Jack Hummer /Jam 778,953.00
44. Mesin gilas /Jam 231,000.00
45. Mesin poles /Hr 112,000.00
46. Mixer /Hr 52,600.00
47. Motor Grader (115 hp) /Jam 902,000.00
48. Paving Finisher /Jam 257,500.00
49. Pneumatic Tired Roller /Jam 358,200.00
50. Rail /Jam 39,100.00
51. Side Form /Jam 63,800.00
52. Sprayer /Hr 44,900.00
53. Stamper /Jam 28,000.00
54. Stone Crusher /Jam 822,600.00
55. Truck Mixer /Jam 280,400.00
56. Truk penarik /Jam 84,100.00
57. Vibrator (4 hp) /Jam 23,000.00
58. Vibro Compactor/Vibratory Roller 6-8 T (7 hp) /Jam 468,000.00
59. Water Tank Truck /Jam 325,000.00
60. Wheel Loader /Jam 332,800.00
61. Whell crane /Jam 1,320,500.00
62. Stone breaker /Jam 381,000.00
63. Tendem roller /Jam 390,000.00
64. Ponton pancang /Jam 2,081,000.00
65. Ponton langsir /Jam 1,445,000.00
66. Mobile Crane pancang /hari 1,650,000.00
67. Mobile Crane langsir /Jam 323,000.00
68. Drop hammer Pancang /hari 168,200.00
69. Crane Service 5 ton /hari 385,000.00
70. MOTOR GRADER 125 HP /Jam 950,000.00
71. VIBRATING ROLLER 6-8 TON /Jam 468,000.00
72. WHEEL LOADER 1,0-1,6 M3 /Jam 332,800.00
73. DUMP TRUCK 3,5 TON /Jam 385,000.00
74. TANDEM ROLLER 6-8 TON /Jam 390,000.00
75. WATER TANK TRUCK 3000-4500 L /Jam 287,918.00
76. ASPHALT DISTRIBUTOR /Jam 275,000.00
77. AIR COMPRESSOR /Jam 194,933.00
78. DUMP TRUCK 10 TON /Jam 450,000.00
79. THREE WHEEL ROLLER 8-10 TON /Jam 475,000.00
80. ASPHALT SPRAYER /Jam 250,000.00
81. concrete pump jam 247,371.00
82. WORK BOAT (Perahu Kerja) jam 319444.444444
83. PILE DRIVER + HAMMER 2,5 TON jam 878,952.00
84. Mesin las 40 Amp jam 495,000.00
85. welding set (Alat Las + Genset) jam 124,500.00
86. CRANE 10-15 TON jam 5000000
87. TONGKANG KAP. 1800 Ton jam 319444.444444
88. TUG BOAT jam 319444.444444
1. Balok 2. Pelat
B = 250 mm P L
H = 300 mm Bordes 4 3
L = 4000 mm Lantai 0 3.3 1.8
n = 2 Lantai 1 3.3 1.8

Tul Longitudinal Besi


Atas = 3 D 13 Arah X n Panjang
Bawah = 3 D 13 atas 27 6.3
Total = 6 buah bawah 27 6.3
Berat = 25.0068 kg
Arah Y n
Tul Transversal aras 26 4
D = 10 mm bawah 26 4
Spasi = 150 mm
n = 27 buah
Panjang = 860 mm Total
Berat = 14.316002103 kg Besi 610.519 kg
Beton 3.466 m3
Bekisting = 6.8 m2 Bekisting 34.808 m2
Beton = 0.6 m3
Besi = 39.3228 kg
t Beton Bekisting
0.12 1.44 13.68
0.12 0.7128 7.164
0.12 0.7128 7.164

Berat
177.23544 kg
177.23544 kg

108.36264 kg
108.36264 kg
Item
NO ITEM Notation
Quantity

KSOP
1 Pondasi F1
1 D13-200
1 D13-200
1 12-D16
1 D10-200

1 Pondasi F2
1 D13-200
1 D13-200
1 12-D16
1 D10-200

2 Sloof/5m
TB1 2 tmp 2 8 D16
Lap 1 5 D16
1 ∅10-100

TB1A 2 tmp 2 10 D16


Lap 1 9 D16
1 ∅10-125

TB2 2 tmp 2 6 D16


Lap 1 5 D16
1 ∅10-100

TBA 2 tmp 2 4 D16


Lap 1 4 D16
1 ∅10-100

3 Kolom/6,7 m
k1 1 12 D16
1 ∅10-200

k2 1 4 D16
1 ∅10-200
4 Balok & RB
TB1 2 tmp 2 8 D16
Lap 1 5 D16
1 ∅10-100

TB1A 2 tmp 2 10 D16


Lap 1 9 D16
1 ∅10-125

TB2 2 tmp 2 6 D16


Lap 1 5 D16
1 ∅10-100

TBA 2 tmp 2 4 D16


Lap 1 4 D16
1 ∅10-100

SLAB
1
1 D16-200
1 D16-200

Mushola
1 Sloof/5m
TB1 2 tmp 2 5 D16
Lap 1 4 D16
1 ∅10-100

2 Kolom/3,3 m
k1 1 4 D16
1 ∅10-200

Pos Jaga
1 Sloof/5m
TB1 2 tmp 2 5 D16
Lap 1 4 D16
1 ∅10-100
2 Kolom/3,3 m
k1 1 4 D16
1 ∅10-200

Kantor K3
1 Pondasi F1
1 D13-200
1 D13-200
1 4-D16
1 D10-200

3 Sloof/5m
TB1 2 tmp 2 5 D16
Lap 1 4 D16
1 ∅10-100

3 Sloof/3m
TB1 2 tmp 2 5 D16
Lap 1 4 D16
1 ∅10-100

4 Kolom/3 m
k1 1 4 D16
1 ∅10-200

Gudang Pelabuhan
1 Pondasi F1
1 D13-200
1 D13-200
1 8-D13
1 D10-150

3 Sloof/5m
TB1 2 tmp 2 5 D16
Lap 1 4 D16
skng tmp 1 ∅10-125
skng lap 1 ∅10-175
Pagar BRC
3 Sloof/5m
TB1 2 tmp 2 5 D16
Lap 1 4 D16
skng tmp 1 ∅10-125
skng lap 1 ∅10-175
WEIGHT LENGTH
Rebar Sub Total Total Length
Remarks DIA ø (kg/m') / (m')/
Qty. Length m' m'
(kg/m2) Area (m2)

Cross D-13 1.04 3.76 7.00 26.29 26.29


Cross D-13 1.04 3.76 7.00 26.29 26.29
Long D-16 1.58 1.41 12.00 16.93 16.93
Sengkang D-10 0.62 0.88 4.00 3.52 3.52

Total

Cross D-13 1.04 3.76 10.00 37.56 37.56


Cross D-13 1.04 3.76 10.00 37.56 37.56
Long D-16 1.58 1.41 12.00 16.93 16.93
Sengkang D-10 0.62 0.88 4.00 3.52 3.52

Total

Top Bottom Tumpuan D-16 1.58 1.89 8.00 15.12 30.24


Top Bottom Lap D-16 1.58 2.50 5.00 12.50 12.50
Stirrup Tumpuan ∅-10 0.62 0.80 50.00 40.00 40.00
Total
Top Bottom Tumpuan D-16 1.58 1.89 10.00 18.90 37.80
Top Bottom Lap D-16 1.58 2.50 9.00 22.50 22.50
Stirrup Tumpuan ∅-10 0.62 1.00 40.00 40.00 40.00
Total
Top Bottom Tumpuan D-16 1.58 1.89 6.00 11.34 22.68
Top Bottom Lap D-16 1.58 2.50 5.00 12.50 12.50
Stirrup Tumpuan ∅-10 0.62 0.78 50.00 39.00 39.00
Total
Top Bottom Tumpuan D-16 1.58 1.89 4.00 7.56 15.12
Top Bottom Lap D-16 1.58 2.50 4.00 10.00 10.00
Stirrup Tumpuan ∅-10 0.62 0.78 50.00 39.00 39.00
Total

Long D-16 1.58 6.70 12.00 80.40 80.40


sengkang ∅-10 0.62 0.88 34.00 29.92 29.92
Total
Long D-16 1.58 6.70 4.00 26.80 26.80
sengkang ∅-10 0.62 0.68 34.00 23.12 23.12
Total
Top Bottom Tumpuan D-16 1.58 1.89 8.00 15.12 30.24
Top Bottom Lap D-16 1.58 2.50 5.00 12.50 12.50
Stirrup Tumpuan ∅-10 0.62 0.80 50.00 40.00 40.00
Total
Top Bottom Tumpuan D-16 1.58 1.89 10.00 18.90 37.80
Top Bottom Lap D-16 1.58 2.50 9.00 22.50 22.50
Stirrup Tumpuan ∅-10 0.62 1.00 40.00 40.00 40.00
Total
Top Bottom Tumpuan D-16 1.58 1.89 6.00 11.34 22.68
Top Bottom Lap D-16 1.58 2.50 5.00 12.50 12.50
Stirrup Tumpuan ∅-10 0.62 0.78 50.00 39.00 39.00
Total
Top Bottom Tumpuan D-16 1.58 1.89 4.00 7.56 15.12
Top Bottom Lap D-16 1.58 2.50 4.00 10.00 10.00
Stirrup Tumpuan ∅-10 0.62 0.78 50.00 39.00 39.00
Total

Long D-16 1.58 4.50 60.00 270.00 270.00


Cross D-16 1.58 6.00 46.00 276.00 276.00

Total
6.75 Rebar Ratio (kg/m3)

Top Bottom Tumpuan D-16 1.58 1.89 5.00 9.45 18.90


Top Bottom Lap D-16 1.58 2.50 4.00 10.00 10.00
Stirrup Tumpuan ∅-10 0.62 0.78 50.00 39.00 39.00
Total

Long D-16 1.58 3.30 4.00 13.20 13.20


sengkang ∅-10 0.62 0.68 17.00 11.56 11.56
Total

Top Bottom Tumpuan D-16 1.58 1.89 5.00 9.45 18.90


Top Bottom Lap D-16 1.58 2.50 4.00 10.00 10.00
Stirrup Tumpuan ∅-10 0.62 0.78 50.00 39.00 39.00
Total
Long D-16 1.58 3.30 4.00 13.20 13.20
sengkang ∅-10 0.62 0.68 17.00 11.56 11.56
Total

Cross D-13 1.04 3.76 7.00 26.29 26.29


Cross D-13 1.04 3.76 7.00 26.29 26.29
Long D-16 1.58 1.41 4.00 5.64 5.64
Sengkang D-10 0.62 0.88 4.00 3.52 3.52

Total

Top Bottom Tumpuan D-16 1.58 1.89 5.00 9.45 18.90


Top Bottom Lap D-16 1.58 2.50 4.00 10.00 10.00
Stirrup Tumpuan ∅-10 0.62 0.78 50.00 39.00 39.00
Total

Top Bottom Tumpuan D-16 1.58 1.39 5.00 6.95 13.90


Top Bottom Lap D-16 1.58 1.50 4.00 6.00 6.00
Stirrup Tumpuan ∅-10 0.62 0.78 30.00 23.40 23.40
Total

Long D-16 1.58 3.00 4.00 12.00 12.00


sengkang ∅-10 0.62 0.68 15.00 10.20 10.20
Total

Cross D-13 1.04 2.56 5.00 12.78 12.78


Cross D-13 1.04 2.56 5.00 12.78 12.78
Long D-13 1.04 1.63 8.00 13.05 13.05
Sengkang D-10 0.62 1.00 5.00 5.00 5.00

Total

Top Bottom Tumpuan D-16 1.58 1.89 5.00 9.45 18.90


Top Bottom Lap D-16 1.58 2.50 4.00 10.00 10.00
Stirrup Tumpuan ∅-10 0.62 1.20 20.00 24.00 24.00
Stirrup Tumpuan ∅-10 0.62 1.20 14.00 16.80 16.80
Total
Top Bottom Tumpuan D-16 1.58 1.89 5.00 9.45 18.90
Top Bottom Lap D-16 1.58 2.50 4.00 10.00 10.00
Stirrup Tumpuan ∅-10 0.62 1.20 20.00 24.00 24.00
Stirrup Tumpuan ∅-10 0.62 1.20 14.00 16.80 16.80
Total
REBAR QUANTITY (ton)
Ø-10 D-13 D-16 D-19
Total WEIGHT kg/m,

jml 2.17 jml 54.79 jml 26.72 jml 0.00


27.40 0.00 27.40 0.00 0.00
27.40 0.00 27.40 0.00 0.00
26.72 0.00 0.00 26.72 0.00
2.17 2.17 0.00 0.00 0.00
0.00 0.00 0.00 0.00
83.68 0.00 0.00 0.00 0.00
jml 2.17 jml 78.28 jml 26.72 jml 0.00
39.14 0.00 39.14 0.00 0.00
39.14 0.00 39.14 0.00 0.00
26.72 0.00 0.00 26.72 0.00
2.17 2.17 0.00 0.00 0.00
0.00 0.00 0.00 0.00
107.17 0.00 0.00 0.00 0.00
jml 0.00 jml 0.00 jml 257.75 jml 0.00
47.72 0.00 0.00 47.72 0.00
19.73 0.00 0.00 19.73 0.00
24.66 0.00 0.00 0.00 0.00
92.11
59.65 0.00 0.00 59.65 0.00
35.51 0.00 0.00 35.51 0.00
24.66 0.00 0.00 0.00 0.00
119.81
35.79 0.00 0.00 35.79 0.00
19.73 0.00 0.00 19.73 0.00
24.04 0.00 0.00 0.00 0.00
79.56
23.86 0.00 0.00 23.86 0.00
15.78 0.00 0.00 15.78 0.00
24.04 0.00 0.00 0.00 0.00
63.68 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
jml 0.00 jml 0.00 jml 169.16 jml 0.00
126.87 0.00 0.00 126.87 0.00
18.45 0.00 0.00 0.00 0.00
145.32
42.29 0.00 0.00 42.29 0.00
14.25 0.00 0.00 0.00 0.00
56.54 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
jml 0.00 jml 0.00 jml 43.40 jml 0.00
47.72 0.00 0.00 47.72 0.00
19.73 0.00 0.00 19.73 0.00
24.66 0.00 0.00 0.00 0.00
92.11
59.65 0.00 0.00 59.65 0.00
35.51 0.00 0.00 35.51 0.00
24.66 0.00 0.00 0.00 0.00
119.81
35.79 0.00 0.00 35.79 0.00
19.73 0.00 0.00 19.73 0.00
24.04 0.00 0.00 0.00 0.00
79.56
23.86 0.00 0.00 23.86 0.00
15.78 0.00 0.00 15.78 0.00
24.04 0.00 0.00 0.00 0.00
63.68 0.00 0.00 0.00 0.00

jml 0.00 jml 0.00 jml 861.59 jml 0.00


426.06 0.00 0.00 426.06 0.00
435.53 0.00 0.00 435.53 0.00
0.00 0.00 0.00 0.00
861.59 0.00 0.00 0.00 0.00
127.64 0.00 0.00 0.00 0.00

jml 429.63 jml 6026.06 jml 21037.27 jml 0.00


29.82 0.00 0.00 29.82 0.00
15.78 0.00 0.00 15.78 0.00
24.04 0.00 0.00 0.00 0.00
69.65

jml 214.81 jml 3013.03 jml 10495.83 jml 0.00


20.83 0.00 0.00 20.83 0.00
7.13 0.00 0.00 0.00 0.00
27.96

jml 107.41 jml 1506.52 jml 5237.50 jml 0.00


29.82 0.00 0.00 29.82 0.00
15.78 0.00 0.00 15.78 0.00
24.04 0.00 0.00 0.00 0.00
69.65
jml 53.70 jml 753.26 jml 2595.95 jml 0.00
20.83 0.00 0.00 20.83 0.00
7.13 0.00 0.00 0.00 0.00
27.96

jml 2.17 jml 54.79 jml 8.91 jml 0.00


27.40 0.00 27.40 0.00 0.00
27.40 0.00 27.40 0.00 0.00
8.91 0.00 0.00 8.91 0.00
2.17 2.17 0.00 0.00 0.00
0.00 0.00 0.00 0.00
65.87 0.00 0.00 0.00 0.00
jml 24.68 jml 321.84 jml 1278.65 jml 0.00
29.82 0.00 0.00 29.82 0.00
15.78 0.00 0.00 15.78 0.00
24.04 0.00 0.00 0.00 0.00
69.65
jml 12.34 jml 160.92 jml 616.52 jml 0.00
21.93 0.00 0.00 21.93 0.00
9.47 0.00 0.00 9.47 0.00
14.43 0.00 0.00 0.00 0.00
45.83

jml 6.17 jml 80.46 jml 292.56 jml 0.00


18.94 0.00 0.00 18.94 0.00
6.29 0.00 0.00 0.00 0.00
25.22

jml 3.09 jml 40.23 jml 0.00 jml 0.00


13.32 0.00 13.32 0.00 0.00
13.32 0.00 13.32 0.00 0.00
13.60 0.00 13.60 0.00 0.00
3.09 3.09 0.00 0.00 0.00
0.00 0.00 0.00 0.00
43.31 0.00 0.00 0.00 0.00
jml 0.00 jml 0.00 jml 136.81 jml 0.00
29.82 0.00 0.00 29.82 0.00
15.78 0.00 0.00 15.78 0.00
14.80 0.00 0.00 0.00 0.00
10.36 0.00 0.00 0.00 0.00
60.40
jml 0.00 jml 0.00 jml 45.60 jml 0.00
29.82 0.00 0.00 29.82 0.00
15.78 0.00 0.00 15.78 0.00
14.80 0.00 0.00 0.00 0.00
10.36 0.00 0.00 0.00 0.00
60.40
UANTITY (ton) REBAR QUANTITY (m')
D-22 D-25 Ø-10 D-13 D-16 D-19 D-22

jml 0.00 jml 0.00 jml 3.52 jml 52.58 jml 16.93 jml 0.00 jml 0.00
0.00 0.00 0.00 26.29 0.00 0.00 0.00
0.00 0.00 0.00 26.29 0.00 0.00 0.00
0.00 0.00 0.00 0.00 16.93 0.00 0.00
0.00 0.00 3.52 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
jml 0.00 jml 0.00 jml 3.52 jml 75.12 jml 16.93 jml 0.00 jml 0.00
0.00 0.00 0.00 37.56 0.00 0.00 0.00
0.00 0.00 0.00 37.56 0.00 0.00 0.00
0.00 0.00 0.00 0.00 16.93 0.00 0.00
0.00 0.00 3.52 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
jml 0.00 jml 0.00 jml 0.00 jml 0.00 jml 163.34 jml 0.00 jml 0.00
0.00 0.00 0.00 0.00 30.24 0.00 0.00
0.00 0.00 0.00 0.00 12.50 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 37.80 0.00 0.00


0.00 0.00 0.00 0.00 22.50 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 22.68 0.00 0.00


0.00 0.00 0.00 0.00 12.50 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 15.12 0.00 0.00


0.00 0.00 0.00 0.00 10.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
jml 0.00 jml 0.00 jml 0.00 jml 0.00 jml 107.20 jml 0.00 jml 0.00
0.00 0.00 0.00 0.00 80.40 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 26.80 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
jml 0.00 jml 0.00 jml 0.00 jml 0.00 jml 27.50 jml 0.00 jml 0.00
0.00 0.00 0.00 0.00 30.24 0.00 0.00
0.00 0.00 0.00 0.00 12.50 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 37.80 0.00 0.00


0.00 0.00 0.00 0.00 22.50 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 22.68 0.00 0.00


0.00 0.00 0.00 0.00 12.50 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 15.12 0.00 0.00


0.00 0.00 0.00 0.00 10.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00

jml 0.00 jml 0.00 jml 0.00 jml 0.00 jml 546.00 jml 0.00 jml 0.00
0.00 0.00 0.00 0.00 270.00 0.00 0.00
0.00 0.00 0.00 0.00 276.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00

jml 0.00 jml 0.00 jml 696.32 jml 5783.17 jml 13331.60 jml 0.00 jml 0.00
0.00 0.00 0.00 0.00 18.90 0.00 0.00
0.00 0.00 0.00 0.00 10.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00

jml 0.00 jml 0.00 jml 348.16 jml 2891.58 jml 6651.35 jml 0.00 jml 0.00
0.00 0.00 0.00 0.00 13.20 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00

jml 0.00 jml 0.00 jml 174.08 jml 1445.79 jml 3319.08 jml 0.00 jml 0.00
0.00 0.00 0.00 0.00 18.90 0.00 0.00
0.00 0.00 0.00 0.00 10.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
jml 0.00 jml 0.00 jml 87.04 jml 722.90 jml 1645.09 jml 0.00 jml 0.00
0.00 0.00 0.00 0.00 13.20 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00

jml 0.00 jml 0.00 jml 3.52 jml 52.58 jml 5.64 jml 0.00 jml 0.00
0.00 0.00 0.00 26.29 0.00 0.00 0.00
0.00 0.00 0.00 26.29 0.00 0.00 0.00
0.00 0.00 0.00 0.00 5.64 0.00 0.00
0.00 0.00 3.52 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
jml 0.00 jml 0.00 jml 40.00 jml 308.86 jml 810.30 jml 0.00 jml 0.00
0.00 0.00 0.00 0.00 18.90 0.00 0.00
0.00 0.00 0.00 0.00 10.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00

jml 0.00 jml 0.00 jml 20.00 jml 154.43 jml 390.70 jml 0.00 jml 0.00
0.00 0.00 0.00 0.00 13.90 0.00 0.00
0.00 0.00 0.00 0.00 6.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00

jml 0.00 jml 0.00 jml 10.00 jml 77.22 jml 185.40 jml 0.00 jml 0.00
0.00 0.00 0.00 0.00 12.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00

jml 0.00 jml 0.00 jml 5.00 jml 38.61 jml 0.00 jml 0.00 jml 0.00
0.00 0.00 0.00 12.78 0.00 0.00 0.00
0.00 0.00 0.00 12.78 0.00 0.00 0.00
0.00 0.00 0.00 13.05 0.00 0.00 0.00
0.00 0.00 5.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
jml 0.00 jml 0.00 jml 0.00 jml 0.00 jml 86.70 jml 0.00 jml 0.00
0.00 0.00 0.00 0.00 18.90 0.00 0.00
0.00 0.00 0.00 0.00 10.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
jml 0.00 jml 0.00 jml 0.00 jml 0.00 jml 28.90 jml 0.00 jml 0.00
0.00 0.00 0.00 0.00 18.90 0.00 0.00
0.00 0.00 0.00 0.00 10.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
D-25

jml 0.00
0.00
0.00
0.00
0.00
0.00
0.00
jml 0.00
0.00
0.00
0.00
0.00
0.00
0.00
jml 0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00
0.00
jml 0.00
0.00
0.00

0.00
0.00
0.00
0.00
jml 0.00
0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00

jml 0.00
0.00
0.00
0.00
0.00
0.00

jml 0.00
0.00
0.00
0.00

jml 0.00
0.00
0.00

jml 0.00
0.00
0.00
0.00
jml 0.00
0.00
0.00

jml 0.00
0.00
0.00
0.00
0.00
0.00
0.00
jml 0.00
0.00
0.00
0.00

jml 0.00
0.00
0.00
0.00

jml 0.00
0.00
0.00

jml 0.00
0.00
0.00
0.00
0.00
0.00
0.00
jml 0.00
0.00
0.00
0.00
0.00
jml 0.00
0.00
0.00
0.00
0.00
Jarak (mile) Satuan

576.14 miles
knot mile/hour hour Hari
1 1.15 83.4

6 6.90 83.4 3.48


-
3.48
6.95

167.00

166.88

Jarak (mile) Satuan

357.092 miles
knot mile/hour hour Hari
1 1.15 77.6

4 4.60 77.6 3
0
3
6
155
BADAN PENGUSAHAAN KAWASAN
PERDAGANGAN BEBAS DAN PELABUHAN BEBAS BINTAN
WILAYAH KOTA TANJUNGPINANG
ANALISIS HARGA SATUAN PEKERJAAN ( A H S P)
DETAILED ENGINEERING DESIGN (DED)

JENIS PEKERJAAN : Mobilisasi & Demobilisasi


VOLUME PEKERJAAN : 1.00
HARGA SATUAN : Lump Sum

HARGA SATUAN JUMLAH


KODE URAIAN SATUAN VOLUME
( Rp ) ( Rp )

1 Peralatan
Pontoon 120 ft jam 53.0000 1,124,028.30 59,573,499.90
Tugboat jam 53.0000 1,212,836.43 64,280,330.79
Crawler Crane 50 ton jam 53.0000 951,720.68 50,441,196.04
Pontoon 180 ft + winch + anchor jam 53.0000 2,787,313.29 147,727,604.37
Crawler Crane 100 ton jam 53.0000 1,706,720.68 90,456,196.04
Diesel Hammer D46 jam 53.0000 1,077,865.74 57,126,884.22
Concrete pump jam 53.0000 745,582.82 39,515,889.46
Concrete Mixer jam 53.0000 334,604.94 17,734,061.82
Dump Truck jam 53.0000 362,486.01 19,211,758.53
Excavator jam 53.0000 692,970.68 36,727,446.04
Vibro Roller jam 53.0000 706,567.01 37,448,051.53
Bulldozer jam 53.0000 245,336.02 13,002,809.06
Water Tanker jam 53.0000 221,276.00 11,727,628.00
Wheel Roller jam 53.0000 86,200.00 4,568,600.00
Motor Grader jam 53.0000 257,656.00 13,655,768.00
Tandem Roller jam 53.0000 706,567.01 37,448,051.53

Note: Asumsi semua Alat Berat didatangkan dari Makasar Total 700,645,775.33
Mobilisasi & Demobilisasi Lump Sum 700,645,775.33
Overhead / Profit (10%) 70,064,577.53
JUMLAH 770,710,352.86

JENIS PEKERJAAN : Stakeout dan Positioning


VOLUME PEKERJAAN : 1.00
HARGA SATUAN : Lump Sum

HARGA SATUAN JUMLAH


KODE URAIAN SATUAN VOLUME
( Rp ) ( Rp )

Total Station 2 Unit hari 120.0000 200,000.00 24,000,000.00


Water Pass 2 Unit hari 120.0000 350,000.00 42,000,000.00

Juru Ukur/ Surveyor 4 ORANG hari 120.0000 200,000.00 24,000,000.00


Pekerja 4 ORANG hari 120.0000 100,000.00 12,000,000.00

Total 102,000,000.00
Stakeout dan Positioning Lump Sum 102,000,000.00
Overhead / Profit (10%) 10,200,000.00
JUMLAH 112,200,000.00

JENIS PEKERJAAN : Direksi Keet dan Fasilitas Sementara


VOLUME PEKERJAAN : 1.00
HARGA SATUAN : Lump Sum

HARGA SATUAN JUMLAH


KODE URAIAN SATUAN VOLUME
( Rp ) ( Rp )

1 Sewa Kantor (L = 100 m2) Bulan 12.0000 15,000,000.00 180,000,000.00


2 Sewa Workshop (L = 40 m2) Bulan 12.0000 600,000.00 7,200,000.00
Total 187,200,000.00
Direksi Keet dan Fasilitas Sementara Lump Sum 187,200,000.00
Overhead / Profit (10%) 18,720,000.00
JUMLAH 205,920,000.00

JENIS PEKERJAAN : Penerangan dan Keselamatan Kerja


VOLUME PEKERJAAN : 1.00
HARGA SATUAN : Lump Sum

HARGA SATUAN JUMLAH


KODE URAIAN SATUAN VOLUME
( Rp ) ( Rp )

Penerangan Proyek
1 Biaya Operasional Kantor (Listrik, Air, Kebersihan) bulan 12.0000 5,200,000.00 62,400,000.00
Keselamatan Kerja (K3)
1 Alat Pelindung Diri
- Safety Helm bh 28.0000 89,700.00 2,511,600.00
- Safety Shoes bh 28.0000 627,300.00 17,564,400.00
- Safety glass bh 28.0000 54,200.00 1,517,600.00
- Hearing protection bh 28.0000 205,700.00 5,759,600.00
- Life jacket bh 28.0000 327,000.00 9,156,000.00
2 Peralatan PPPK set 3.0000 770,000.00 2,310,000.00
3 Tenda untuk antisipasi hujan Ls 1.0000 400,400.00 400,400.00

Total 101,619,600.00
0 Lump Sum 101,619,600.00
Overhead / Profit (10%) 10,161,960.00
JUMLAH 111,781,560.00

JENIS PEKERJAAN : Administrasi, Dokumentasi, sarana kantor & Komunikasi


VOLUME PEKERJAAN : 1.00
HARGA SATUAN : Lump Sum

HARGA SATUAN JUMLAH


KODE URAIAN SATUAN VOLUME
( Rp ) ( Rp )

1 Biaya ATK
- ATK kantor lapangan bln 12.0000 3,500,000.00 42,000,000.00
2 Biaya Komputer & Printer
- Sewa Komputer & Printer kantor lapangan unit-bulan 12.0000 2,500,000.00 30,000,000.00
Sewa furniture kantor
- Sewa Meja dan kursi kerja set-bulan 12.0000 1,750,000.00 21,000,000.00
- Sewa Meja dan kursi rapat set-bulan 12.0000 2,500,000.00 30,000,000.00
- Sewa AC unit-bulan 12.0000 600,000.00 7,200,000.00
- Sewa Filling cabinet unit-bulan 12.0000 250,000.00 3,000,000.00
- Sewa White board unit-bulan 12.0000 100,000.00 1,200,000.00
4 Biaya Komunikasi
- Biaya Komunikasi Lapangan Kantor lapangan (Domestic) bulan 12.0000 3,250,000.00 39,000,000.00

Total 173,400,000.00
Administrasi, Dokumentasi, sarana kantor & Komunikasi Lump Sum 173,400,000.00
Overhead / Profit (10%) 17,340,000.00
JUMLAH 190,740,000.00

JENIS PEKERJAAN : Pembersihan Lahan (Grubbing & Clearing)


VOLUME PEKERJAAN : 1.00
HARGA SATUAN : m2

HARGA SATUAN JUMLAH


KODE URAIAN SATUAN VOLUME
( Rp ) ( Rp )

BAHAN / MATERIAL

Total 0.00
UPAH
Pekerja hari 0.0589 100,000.00 5,890.00
Mandor hari 0.0132 200,000.00 2,640.00

Total 8,530.00
ALAT
Bulldozer jam 0.0098 245,336.02 2,404.29
Dump Truck jam 0.0080 362,486.01 2,899.89
Excavator jam 0.0138 692,970.68 9,563.00

Total 14,867.18
Pembersihan Lahan (Grubbing & Clearing) m2 23,397.18
Overhead / Profit (10%) 2,339.72
JUMLAH 25,736.89

JENIS PEKERJAAN : Pembersihan Lahan (Stripping, t=1 m)


VOLUME PEKERJAAN : 1.00
HARGA SATUAN : m2

HARGA SATUAN JUMLAH


KODE URAIAN SATUAN VOLUME
( Rp ) ( Rp )

BAHAN / MATERIAL

Total 0.00
UPAH
Pekerja hari 0.2305 100,000.00 23,045.27
Mandor hari 0.0230 200,000.00 4,609.05

Total 27,654.32
ALAT
Dump Truck jam 0.0266 362,486.01 9,660.00
Excavator jam 0.0230 692,970.68 15,969.69

Total 25,629.70
Pembersihan Lahan (Stripping, t=1 m) m2 53,284.02
Overhead / Profit (10%) 5,328.40
JUMLAH 58,612.42

JENIS PEKERJAAN : Pengecoran Beton (K.250) insitu beton Total cas insitu 1A
VOLUME PEKERJAAN : 1.00
HARGA SATUAN : m3 Masa pelaksanaa

HARGA SATUAN JUMLAH


KODE URAIAN SATUAN VOLUME
( Rp ) ( Rp )

BAHAN / MATERIAL
Semen Portland 50 Kg kg 384.0000 1,600.00 614,400.00
Pasir Beton m3 0.4943 261,099.89 129,061.67
Batu Pecah 5/7 cm m3 0.5772 252,820.83 145,928.18
Air (biaya air tawar) m3 0.2150 5,000.00 1,075.00
Additive Silicafume kg 30.7200 20,000.00 614,400.00
Additive Superpltastitizer ltr 3.0000 30,000.00 90,000.00

Total 1,594,864.86
UPAH PEKERJA (Pengecoran Beton)
Mandor hari 0.0830 200,000.00 16,600.00
Kepala Tukang hari 0.0280 180,000.00 5,040.00
Tukang hari 0.2750 150,000.00 41,250.00
Pekerja hari 1.6500 100,000.00 165,000.00
Concrete vibrator
PERALATAN Ponton Supply
Concrete pump jam 0.1200 745,582.82 89,469.94
Concrete vibrator jam 0.4800 17,750.00 8,520.00
Compressor jam 0.2000 151,051.00 30,210.20
Concrete Mixer jam 0.2000 334,604.94 66,920.99

Total 423,011.13
Pengecoran Beton (K.250) insitu beton m3 2,017,875.98
Overhead / Profit (10%) 201,787.60
JUMLAH 2,219,663.58

JENIS PEKERJAAN : Pengecoran Beton (K.175) insitu beton Masa pelaksanaa


VOLUME PEKERJAAN : 1.00 Produksi per hari
HARGA SATUAN : m3 Produksi per jam

HARGA SATUAN JUMLAH


KODE URAIAN SATUAN VOLUME
( Rp ) ( Rp )

BAHAN / MATERIAL
Semen Portland 50 Kg kg 326.0000 1,600.00 521,600.00
Pasir Beton m3 0.5429 261,099.89 141,751.13
Batu Pecah 5/7 cm m3 0.5717 252,820.83 144,537.67
Air (biaya air tawar) m3 0.2150 5,000.00 1,075.00

Total 808,963.80
UPAH PEKERJA (Pengecoran Beton)
Mandor hari 0.0830 200,000.00 16,600.00
Kepala Tukang hari 0.0280 180,000.00 5,040.00
Tukang hari 0.2750 150,000.00 41,250.00
Pekerja hari 1.6500 100,000.00 165,000.00
Tug boat
PERALATAN Truck Mixer
Concrete pump jam 0.1200 745,582.82 89,469.94
Concrete vibrator jam 0.4800 17,750.00 8,520.00
Compressor jam 0.2000 151,051.00 30,210.20
Concrete Mixer jam 0.2000 334,604.94 66,920.99

Total 423,011.13
Pengecoran Beton (K.175) insitu beton m3 1,231,974.92
Overhead / Profit (10%) 123,197.49
JUMLAH 1,355,172.42
Produksi per hari
JENIS PEKERJAAN : Pekerjaan Pembesian untuk Beton Insitu
VOLUME PEKERJAAN : 1.00
HARGA SATUAN : Kg

HARGA SATUAN JUMLAH


KODE URAIAN SATUAN VOLUME
( Rp ) ( Rp )

BAHAN / MATERIAL
Baja Tulangan kg 1.0500 11,132.12 11,688.73
Kawat Bendrat kg 0.0150 39,753.09 596.30
Total 12,285.02
UPAH Concrete pump
Mandor hari 0.0004 200,000.00 80.00
Kepala Tukang hari 0.0007 180,000.00 126.00
Tukang hari 0.0070 150,000.00 1,050.00
Pekerja hari 0.0070 100,000.00 700.00
###
PERALATAN ###
Bar Cutter jam 0.0005 76,250.00 38.13
Bar Bender jam 0.0005 76,250.00 38.13
###
Total 2,032.25
Pekerjaan Pembesian untuk Beton Insitu Kg 14,317.27
Overhead / Profit (10%) 1,431.73
JUMLAH 15,749.00
###
JENIS PEKERJAAN : Pekerjaan Bekisting untuk Beton Insitu
VOLUME PEKERJAAN : 1.00
HARGA SATUAN : m2

HARGA SATUAN JUMLAH


KODE URAIAN SATUAN VOLUME
( Rp ) ( Rp )

Bahan
Multiplek t= 12mm lembar 0.2000 244,464.20 48,892.84
Kayu Kls II m3 0.0150 2,521,030.75 37,815.46
Paku kg 0.3500 26,736.70 9,357.85
Minyak Bekisting liter 1.6000 29,967.23 47,947.56

Total 144,013.71

Upah
Pekerja hari 0.2500 100,000.00 25,000.00
Tukang hari 0.6000 150,000.00 90,000.00
Kepala Tukang hari 0.0600 180,000.00 10,800.00
Mandor hari 0.0120 200,000.00 2,400.00

Total 128,200.00
Pekerjaan Bekisting untuk Beton Insitu m2 272,213.71
Overhead / Profit (10%) 27,221.37
JUMLAH 299,435.08

JENIS PEKERJAAN : Pekerjaan Baja


VOLUME PEKERJAAN : 1.00
HARGA SATUAN : kg

HARGA SATUAN JUMLAH


KODE URAIAN SATUAN VOLUME
( Rp ) ( Rp )

BAHAN / MATERIAL
Baja profil / plat kg 1.1500 11,878.79 13,660.61
Electode Las kg 0.0010 49,000.00 49.00

Total 13,709.61
UPAH
Pekerja hari 0.0040 100,000.00 400.00
Tukang Las hari 0.0040 150,000.00 600.00
Mandor hari 0.0004 200,000.00 80.00

Total 1,080.00
ALAT
Mesin Las jam 0.0040 70,000.00 280.00
Crawler Crane 50 ton jam 0.0040 951,720.68 3,806.88

Total 4,086.88
Pekerjaan Baja kg 18,876.49
Overhead / Profit (10%) 1,887.65
JUMLAH 20,764.14

JENIS PEKERJAAN : Galian Tanah Biasa Sedalam > 1m s.d 2m (PUPR -2016, B.15.a, hal. 90)
VOLUME PEKERJAAN : 1.00
HARGA SATUAN : m3

HARGA SATUAN JUMLAH


KODE URAIAN SATUAN VOLUME
( Rp ) ( Rp )

BAHAN / MATERIAL

Total 0.00
UPAH
Pekerja hari 0.6750 100,000.00 67,500.00
Mandor hari 0.0675 200,000.00 13,500.00
Total 81,000.00
ALAT

Total 0.00
Galian Tanah Biasa Sedalam > 1m s.d 2m (PUPR -2016, B.15.a, hal. 90) m3 81,000.00
Overhead / Profit (10%) 8,100.00
JUMLAH 89,100.00

JENIS PEKERJAAN : Timbunan Tanah Urugan Kembali (PUPR -2016, B.15.a, hal. 114)
VOLUME PEKERJAAN : 1.00
HARGA SATUAN : m3

HARGA SATUAN JUMLAH


KODE URAIAN SATUAN VOLUME
( Rp ) ( Rp )

BAHAN / MATERIAL

Total 0.00
UPAH
Pekerja hari 0.3750 100,000.00 37,500.00
Mandor hari 0.0125 200,000.00 2,500.00

Total 40,000.00
ALAT

Total 0.00
Timbunan Tanah Urugan Kembali (PUPR -2016, B.15.a, hal. 114) m3 40,000.00
Overhead / Profit (10%) 4,000.00
JUMLAH 44,000.00

JENIS PEKERJAAN : Pekerjaan Timbunan Tanah


VOLUME PEKERJAAN : 1.00
HARGA SATUAN : m3

HARGA SATUAN JUMLAH


KODE URAIAN SATUAN VOLUME
( Rp ) ( Rp )

BAHAN / MATERIAL
Tanah Urug m3 1.2000 150,000.00 180,000.00

Total 180,000.00
UPAH
Pekerja hari 0.3750 100,000.00 37,500.00
Mandor hari 0.0125 200,000.00 2,500.00

Total 40,000.00
ALAT
Alat Bantu ls 1.0000 5,000.00 5,000.00

Total 5,000.00
Pekerjaan Timbunan Tanah m3 225,000.00
Overhead / Profit (10%) 22,500.00
JUMLAH 247,500.00

JENIS PEKERJAAN : Pekerjaan Timbunan Pasir


VOLUME PEKERJAAN : 1.00
HARGA SATUAN : m3

HARGA SATUAN JUMLAH


KODE URAIAN SATUAN VOLUME
( Rp ) ( Rp )

BAHAN / MATERIAL
Pasir Urug m3 1.2000 180,500.00 216,600.00

Total 216,600.00
UPAH
Pekerja hari 0.4000 100,000.00 40,000.00
Mandor hari 0.0400 200,000.00 8,000.00

Total 48,000.00
ALAT
Alat Bantu ls 1.0000 5,000.00 5,000.00

Total 5,000.00
Pekerjaan Timbunan Pasir m3 269,600.00
Overhead / Profit (10%) 26,960.00
JUMLAH 296,560.00

JENIS PEKERJAAN : Anstamping (2835:2008, hal 31)


VOLUME PEKERJAAN : 1.00
HARGA SATUAN : m3

HARGA SATUAN JUMLAH


KODE URAIAN SATUAN VOLUME
KODE URAIAN SATUAN VOLUME
( Rp ) ( Rp )

BAHAN / MATERIAL
Batu Pecah 5/7 cm m3 1.2000 252,820.83 303,385.00
Pasir Urug m3 0.4320 180,500.00 77,976.00

Total 381,361.00
UPAH
Pekerja hari 0.7800 100,000.00 78,000.00
Tukang hari 0.3900 150,000.00 58,500.00
Kepala Tukang hari 0.0390 180,000.00 7,020.00
Mandor hari 0.0390 200,000.00 7,800.00

Total 151,320.00
ALAT
Alat Bantu ls 1.0000 5,000.00 5,000.00

Total 5,000.00
Anstamping (2835:2008, hal 31) m3 537,681.00

JENIS PEKERJAAN : Batu Kali, campuran 1PC : 3PP (2835:2008, hal. 29)
VOLUME PEKERJAAN : 1.00
HARGA SATUAN : m3

HARGA SATUAN JUMLAH


KODE URAIAN SATUAN VOLUME
( Rp ) ( Rp )

BAHAN / MATERIAL
Batu Pecah 5/7 cm m3 1.2000 252,820.83 303,385.00
Semen Portland 50 Kg kg 163.0000 1,600.00 260,800.00
Pasir Pasang m3 0.5200 198,000.00 102,960.00

Total 667,145.00
UPAH
Pekerja hari 1.5000 100,000.00 150,000.00
Tukang hari 0.7500 150,000.00 112,500.00
Kepala Tukang hari 0.0750 180,000.00 13,500.00
Mandor hari 0.0750 200,000.00 15,000.00

Total 291,000.00
ALAT
Alat Bantu ls 1.0000 5,000.00 5,000.00

Total 5,000.00
Batu Kali, campuran 1PC : 3PP (2835:2008, hal. 29) m3 963,145.00
Overhead / Profit (10%) 96,314.50
JUMLAH 1,059,459.50

JENIS PEKERJAAN : Acian Plesteran


VOLUME PEKERJAAN : 1.00
HARGA SATUAN : m2
HARGA SATUAN JUMLAH
KODE URAIAN SATUAN VOLUME
( Rp ) ( Rp )

BAHAN / MATERIAL
Semen Portland kg 4.0000 1,600.00 6,400.00
Pasir Pasang m3 0.0100 198,000.00 1,980.00

Total 8,380.00
UPAH
Pekerja hari 0.1430 100,000.00 14,300.00
Tukang hari 0.1070 150,000.00 16,050.00
Kepala Tukang hari 0.0110 180,000.00 1,980.00
Mandor hari 0.0110 200,000.00 2,200.00

Total 34,530.00
ALAT
Alat Bantu ls 1.0000 5,000.00 5,000.00

Total 5,000.00
0 0 47,910.00
Overhead / Profit (10%) 4,791.00
JUMLAH 52,701.00

JENIS PEKERJAAN : Pasangan Dinding


VOLUME PEKERJAAN : 1.00
HARGA SATUAN : m2
HARGA SATUAN JUMLAH
KODE URAIAN SATUAN VOLUME
( Rp ) ( Rp )

BAHAN / MATERIAL
Bata Merah bh 70.0000 2,500.00 175,000.00
Semen Portland kg 0.0100 197,515.96 1,975.16
Pasir Pasang m3

Total 176,975.16
UPAH
Pekerja hari 0.1430 362,486.01 51,835.50
Tukang hari 0.1070 0.00 0.00
Kepala Tukang hari - 0.00 0.00
Mandor hari 0.0110 0.00 0.00

Total 51,835.50
ALAT
Alat Bantu ls 1.0000 5,000.00 5,000.00

Total 5,000.00
0 0 233,810.66
Overhead / Profit (10%) 23,381.07
JUMLAH 257,191.72

JENIS PEKERJAAN : Keramik 60x60


VOLUME PEKERJAAN : 1.00
HARGA SATUAN : m2
HARGA SATUAN JUMLAH
KODE URAIAN SATUAN VOLUME
( Rp ) ( Rp )

BAHAN / MATERIAL
Keramik 60x60 m2 1.0000 314,253.65 314,253.65
Semen Khusus kg 8.0000 6,197.53 49,580.25
Pasir Pasang m3 0.0180 198,000.00
Semen Warna kg 0.0130 20,000.00
Total 363,833.89
UPAH
Pekerja hari 0.1875 100,000.00 18,750.00
Tukang hari 0.3750 150,000.00 56,250.00
Kepala Tukang hari 0.00
Mandor hari 0.0188 200,000.00 3,760.00

Total 78,760.00
ALAT
Alat Bantu ls 1.0000 5,000.00 5,000.00

Total 5,000.00
0 0 447,593.89
Overhead / Profit (10%) 44,759.39
JUMLAH 492,353.28

JENIS PEKERJAAN : Keramik 40x40


VOLUME PEKERJAAN : 1.00
HARGA SATUAN : m2
HARGA SATUAN JUMLAH
KODE URAIAN SATUAN VOLUME
( Rp ) ( Rp )

BAHAN / MATERIAL
Keramik 40x40 m2 1.0000 99,304.15 99,304.15
Semen Khusus kg 8.0000 6,197.53 49,580.25
Pasir Pasang m3 0.0180 197,515.96
Semen Warna kg 0.0130 150,000.00
Total 148,884.40
UPAH
Pekerja hari 0.1875 0.00 0.00
Tukang hari 0.3750 0.00 0.00
Kepala Tukang hari 0.00
Mandor hari 0.0188 151,051.00 2,839.76

Total 2,839.76
ALAT
Alat Bantu ls 1.0000 5,000.00 5,000.00

Total 5,000.00
0 0 156,724.16
Overhead / Profit (10%) 15,672.42
JUMLAH 172,396.57

JENIS PEKERJAAN : Mengangkut Material/Hasil Galian dengan Jarak Angkut 20m (PUPR -2016, B.15.a, hal. 117)
VOLUME PEKERJAAN : 1.00
HARGA SATUAN : m3

HARGA SATUAN JUMLAH


KODE URAIAN SATUAN VOLUME
( Rp ) ( Rp )
BAHAN / MATERIAL

Total 0.00
UPAH
Pekerja hari 0.3150 100,000.00 31,500.00
Mandor hari 0.0158 200,000.00 3,160.00

Total 34,660.00
ALAT

Total 0.00
Mengangkut Material/Hasil Galian dengan Jarak Angkut 20m (PUPR -2016, B.15.a, hal. 117) m3 34,660.00
Overhead / Profit (10%) 3,466.00
JUMLAH 38,126.00

JENIS PEKERJAAN : Pekerjaan Baja + Hot Dip Galvanized


VOLUME PEKERJAAN : 1.00
HARGA SATUAN : kg

HARGA SATUAN JUMLAH


KODE URAIAN SATUAN VOLUME
( Rp ) ( Rp )

BAHAN / MATERIAL
Baja profil / plat kg 1.1500 17,730.19 20,389.72
Electode Las kg 0.0010 49,000.00 46.67
Hot Dip Galvanized kg 1.1500 3,000.00 3,450.00

Total 23,886.39
UPAH
Pekerja hari 0.0050 100,000.00 500.00
Tukang Las hari 0.0040 150,000.00 600.00
Mandor hari 0.0004 200,000.00 80.00

Total 1,180.00
ALAT
Mesin Las jam 0.0040 70,000.00 280.00
Crawler Crane 50 ton jam 0.0040 951,720.68 3,806.88

Total 4,086.88
Pekerjaan Baja + Hot Dip Galvanized kg 29,153.27
Overhead / Profit (10%) 2,915.33
JUMLAH 32,068.60
BADAN PENGUSAHAAN KAWASAN
PERDAGANGAN BEBAS DAN PELABUHAN BEBAS BINTAN
WILAYAH KOTA TANJUNGPINANG

I. DAFTAR HARGA UPAH


HARGA SATUAN
KODE NAMA PEKERJAAN SATUAN
SEWA
(Rp)
Pekerja orang/hari (8 jam) 100,000.00
Tukang Kayu orang/hari (8 jam) 150,000.00
Kepala Tukang Kayu orang/hari (8 jam) 180,000.00
Tukang Batu orang/hari (8 jam) 150,000.00
Kepala Tukang Batu orang/hari (8 jam) 180,000.00
Tukang Batu orang/hari (8 jam) 150,000.00
Kepala Tukang Batu orang/hari (8 jam) 180,000.00
Tukang Besi orang/hari (8 jam) 150,000.00
Kepala Tukang Besi orang/hari (8 jam) 180,000.00
Tukang Cat orang/hari (8 jam) 150,000.00
Kepala Tukang Cat orang/hari (8 jam) 180,000.00
Tukang Listrik orang/hari (8 jam) 150,000.00
Kepala Tukang Listrik orang/hari (8 jam) 180,000.00
Tukang Las orang/hari (8 jam) 150,000.00
Kepala Tukang Listrik Las orang/hari (8 jam) 180,000.00
Mandor orang/hari (8 jam) 200,000.00
Supir Truk orang/hari (8 jam) 150,000.00
Kenek Truk orang/hari (8 jam) 130,000.00
Operator Alat Berat orang/hari (8 jam) 255,000.00
Pembantu Operator Alat Berat orang/hari (8 jam) 170,000.00
Operator Alat Pipa orang/hari (8 jam) 200,000.00
Pembantu Operator Alat Pipa orang/hari (8 jam) 130,000.00
Operator Jaringan Network Internet orang/hari (8 jam) 200,000.00
Pembantu Operator Jaringan Internet orang/hari (8 jam) 180,000.00
Penjaga Malam orang/hari (8 jam) 100,000.00
Surveyor orang/hari (8 jam) 200,000.00
II. DAFTAR SEWA PERALATAN
HARGA SATUAN
KODE NAMA PERA LAT AN SATUAN
SEWA
(Rp)

Alat Potong Tiang Pancang jam 93,800.00


Bar Bender jam 76,250.00
Bar Cutter jam 76,250.00
Biaya Komunikasi Lapangan bulan 3,250,000.00
Biaya Operasional Kantor (Listrik, Air, Kebersihan) bulan 5,250,000.00
Bulldozer jam 245,336.02
Compressor jam 151,051.00
Concrete Mixer jam 334,604.94
Concrete pump jam 745,582.82
Concrete vibrator jam 17,750.00
Concrete Batching Plant jam 401,892.00
Crawler Crane 50 ton jam 951,720.68
Crawler Crane 100 ton jam 1,706,720.68
Diesel Hammer D62 jam 1,077,865.74
Diesel Hammer D46 jam 814,865.74
Dump Truck jam 362,486.01
Excavator Standard PC-200 jam 692,970.68
Generator Set 50Kva jam 144,250.00
Mesin Las jam 70,000.00
Motor Grader jam 257,656.00
Pontoon 120 ft jam 1,124,028.30
Pontoon 180 ft + winch + anchor jam 2,787,313.29
Total Station hari 180,000.00
Truck Trailer jam 321,000.00
Tugboat jam 1,212,836.43
Tugboat + Barge 180 ft jam 937,500.00
Tandem Roller jam 706,567.01
Tire Roller jam 611,719.00
Vibro Roller jam 706,567.01
Water Pass hari 306,448.00
Water Tanker jam 221,276.00
Wheel Roller jam 86,200.00
Sewa AC unit-bulan 600,000.00
Sewa Filling cabinet unit-bulan 250,000.00
Sewa Kantor bulan/m2 150,000.00
Sewa Komputer & Printer unit-bulan 2,500,000.00
Sewa Meja dan kursi kerja set-bulan 1,750,000.00
Sewa Meja dan kursi rapat set-bulan 2,500,000.00
Sewa White board unit-bulan 100,000.00
III. DAFTAR HARGA BAHAN
HARGA SATUAN
KODE NAMA PERA LAT AN SATUAN
SEWA
ASPAL
Hotmix m3 87,500.00
Aspal drum 155 kg kg 25,000.00
Aspal Curah kg 10,000.00
Aspal Emulsi kg 8,000.00
Aspal Minyak kg 9,500.00
Asbuton Halus ton 1,160,000.00
Aspal kg 17,000.00
Aspal Karet kg 94,414.14
Semen, Mortas, dan Kapur -
Semen Tiga Roda zak 98,000.00
Semen putih zak 175,000.00
Semen warna kg 20,000.00
Semen Merah (Bubuk Bata) m3 58,964.09
Kapur Pasang/Kapur tembok m3 12,799.10
Semen/PC (50kg) zak 79,000.00
Semen/PC (kg) kg 1,600.00
Semen Khusus kg 6,197.53
Semen (Pc) (Untuk Mortar) kg 22,000.00
Chipping kg 300.00
-
KACA -
Kaca polos 2 mm m2 100,000.00
Kaca polos 3 mm m2 173,000.00
Kaca polos 5 mm m2 221,800.00
Kaca polos 8 mm m2 728,000.00
Kaca Buram 12 mm Tempered m2 259,000.00
Kaca raybend 5 mm m2 238,731.76
Kaca raybend 8 mm m2 374,312.01
Kaca es 3 mm m2 174,612.79
Kaca es 5 mm m2 245,555.56
Kaca patri ex lokal terpasang m2 1,822,573.51
Kaca patri ex Luar Negeri terpasang m2 6,002,469.14
Glass Block 20 x 20 cm (ex. Luar) bh 131,200.90
Glass Block 20 x 20 cm (ex. DN) bh 34,343.43
Kaca Cermin 5 mm m2 204,624.02
Profil Kaca m 4,838.38
-
PASIR DAN TANAH -
Tanah Urug m3 150,000.00
Tanah gembur Lembang m3 -
Pasir urug m3 180,500.00
Pasir batu (sirtu) tersaring m3 204,074.07
Sirtu m3 181,644.22
Pasir pasang m3 198,000.00
Pasir beton m3 261,099.89
Pasir Aspal m3 288,043.77
Abu batu m3 217,853.20
Material Agregat Kelas A m3 996,750.00
Material Agregat Kelas B m3 835,153.00
Urugan Pilihan Pasir (Untuk Mortar) m3 200,000.00
Mat. Pilihan m3 167,888.13
Agregat Pilihan Kelas C m3 673,600.00
Pasir m3 180,500.00
Tanah subur/gembur m3 56,720.00
Pasir Selica Specs: Mesh 4-8 mili kg 5,392.59
-
BATU -
Bata Merah bh 2,500.00
Kerikil 3/4 m3 540,000.00
Batu gosok (apung) kg 17,776.70
Batu pecah mesin 1/2:1 m3 316,026.04
Batu pecah mesin 1:2 m3 295,109.32
Batu pecah mesin 2:3 m3 271,012.35
Batu pecah mesin 3:5 m3 276,523.10
Batu pecah 5:7 m3 252,820.83
Batu pecah 7:10 m3 198,218.63
Batu pecah 10:15 m3 157,026.26
Batu belah pondasi m3 156,988.55
Batu Bronjong m3 181,715.29
Batu Koral Beton Kali m3 205,710.44
Batu templek Hitam m2 197,515.96
Batu pinggir beton 10x20x35 (Kansteen) bh 21,068.82
Batu pinggir beton 10x20x35 (K-225) bh 55,304.87
Batu Telor m3 165,913.36
Batu templek hijau m2 91,674.07
Batu templek Palimanan m2 84,031.43
Batu pearlstone warna kg 11,853.65
Batu granit kg 9,616.16
Batu Andesit ukuran 20 x 40 x 8 cm m2 250,020.20
Batako kecil uk. 8 x 10 x 20 bh 1,317.35
Batako besar uk. 8 x 20 x 40 bh 3,419.08
Batu merah bakar kelas I bh 1,106.17
Batu merah bakar kelas II bh 905.05
Batu merah oven (klingker) bh 2,287.77
Batako berlobang (HB. 10) bh 3,808.75
Batako berlobang (HB. 15) bh 4,877.22
Batako berlobang (HB. 20) bh 6,109.09
Batu rooster, uk. 20 x 20 cm bh 8,246.02
Beton dekoratif, uk. 10 x 20 x 40 bh 12,640.54
Batu krawang bh 11,451.40
Batu paras m2 104,168.80
Batu Kali m3 143,210.42
Agregat Kasar m3 219,513.71
Agregat Halus m3 219,513.71
Bahan Agr.Base Kelas A m3 228,148.15
Bahan Agr.Base Kelas B m3 228,148.15
Bahan Agr.Base Kelas C m3 124,444.44
Batu Belah / Kerakal m3 179,753.09
Bahan Tanah Timbunan m3 31,802.47
Agregat Pecah Mesin 0-5 mm m3 200,493.83
Agregat Pecah Mesin 5-10 mm & 10-20 mm m3 262,716.05
Agregat Pecah Mesin 20-30 mm bh 262,716.05
Batu pecah 3-5 cm m' 207,407.41
Batu pecah 2-3 cm m3 200,493.83
Batu pecah 1-2 cm m3 276,543.21
Batu pecah 0.5-1 cm m3 145,185.19
Batu m3 179,753.09
Bronjong Dengan Kawat Dilapisi Galvanis bh 746,666.67
Batu terapistone kg 2,828.28
Batu Templek m2 138,261.55
Batu Sikat kg 6,285.07
Kanstin 6 x 15 x 39 cm bh 15,084.18
Kanstin 9 x 15 x 39 cm bh 18,855.22
Batu Cury m2 226,262.63
-
CAT -
Cat tembok ICI Eksterior gln 376,639.28
Cat tembok ICI Interior gln 352,944.56
Cat tembok Catylac Eksterior gln 260,503.70
Cat tembok Catylac Interior gln 243,697.42
Cat tembok Vinilex gln 208,350.17
Cat tembok Sanlex gln 152,790.12
Cat tahan asam gln 164,103.25
Cat Marka / Spotlight kg 148,654.55
Cat kayu kg 69,450.06
Cat besi kg 69,450.06
Cat Duco kg 252,094.28
Cat Brom kg 107,303.79
Cat Digalvanis kg 55,459.48
Cat dasar Kayu/Besi ltr 20,992.14
Cat tembok Wiratex kg 31,249.38
Cat Marka kg 65,691.58
Cat primer kg 114,218.63
Cat dasar Alkali ltr 121,653.87
Cat dasar tembok, Indo 9000 Sealer Water Base kg 33,788.55
Waterprofing Emulsion kg 138,573.29
Waterprofing Membrance m 109,234.57
Glass Bead kg 27,050.95
Melamik kg 73,872.23
Cat trottoar floor hardener m2 97,230.08
Cat trottoar Mowilex m2 83,340.07
Cat Besi kg 76,049.38
Cat Anti Karat kg 62,222.22
Cat Marka Thermoplastic kg 27,367.72
Glass Bead kg 38,716.05
Cat Marka Non Thermo kg 22,374.86
Politur setara Mowilex ltr 471,380.47
Thermoplastic kg 26,717.85
Coldplastic kg 29,987.34
-
SENG -
Seng BJLS 30, lebar 60 cm (1 rol = 50 m') m 58,815.71
Seng BJLS 30, lebar 90 cm (1 rol = 50 m') m 56,519.15
Seng plat BJLS 25 uk. 90 x 180 cm lbr 71,423.57
Seng plat BJLS 30 uk. 90 x 180 cm lbr 92,428.28
Seng gelombang BJLS 25 uk. 0.90 x 1.80 m lbr 66,039.78
Seng gelombang BJLS 30 uk. 0.90 x 1.80 m lbr 73,950.17
Atap seng gelombang, uk. 0,80 x 1,80 lbr 128,591.34
Atap seng gelombang, uk. 1,05 x 2,40 lbr 93,748.15
Nok stel gelombang, 0.92 m lbr 46,207.86
Nok stel gelombang, 1.10 m lbr 46,207.86
Nok stel rata, 1.10 m lbr 36,114.03
Nok stel rata, 0.92 m lbr 55,560.04
Nok paten rata, 1.05 m lbr 26,887.54
Nok paten gelombang, 0.92 m lbr 16,806.29
Nok paten gelombang, 1.05 m lbr 22,676.54
Nok paten gelombang, 1.10 m lbr 28,219.98
Seng Gelombang BJLS uk. 0.2 x 80 x 180 cm m2 90,770.28
-
BAJA/BESI -
Rangka baja Jembatan kg 31,463.08
Kuda-kuda rangka Baja Ringan (Zinkalun) m2 285,317.17
Kuda-kuda rangka Baja Ringan (Galvalum) m2 298,704.38
IWF ex Jepang kg 18,283.28
IWF ex DN SII kg 23,516.23
Besi profil ex DN-SII kg 17,730.19
Besi profil ex luar negeri kg 15,646.06
Besi "C" Lip Chanel kg 5,693.02
Besi Hollow 4 x 4 tebal 0,8 mm btg 187,508.87
Besi Hollow 4 x 2 tebal 0,8 mm btg 104,168.80
Besi begel Kuda-kuda kg 40,391.65
Baja Struktur Bj 34 (Titik Leleh 210 Mpa) bh 2,614,929.74
Besi Bjtd 40 kg 2,179,131.58
Baja Profil L.40.40.4 m 11,878.79
-
TIANG BETON/BETON PRACETAK -
Pipa beton bertulang 60/100 cm m 520,869.14
Pipa beton bertulang 80/100 cm m 625,050.51
Pipa beton bertulang 100/100 cm m 729,219.30
Pipa beton bertulang 120/100 cm m 798,669.36
Pipa beton jeking pracetak Uk. 0,80/2,43 M m 7,778,406.29
Pipa beton jeking pracetak Uk. 1,10/2,43 M m 8,556,246.91
Pipa beton jeking pracetak Uk. 1,35/2,43 M m 9,411,871.60
Pipa beton jeking pracetak Uk. 1,50/2,43 M m 10,353,048.71
Pipa beton jeking pracetak Uk. 1,80/2,43 M m 11,388,363.64
Pipa beton jeking pracetak Uk. 2,00/2,43 M m 12,527,181.14
Beton HALF SLAB Type 100.05.8 m2 273,513.80
Beton HALF SLAB Type 80.05.5 m2 180,997.53
Panel 240.40.5 lbr 101,667.34
Beton H-Beam 260 btg 4,007,696.88
Beton H-Beam 300 btg 6,120,443.01
Beton H-Beam 340 btg 8,892,620.25
Beton H-Beam 360 btg 11,783,209.52
Beton H-Beam 380 btg 8,382,931.00
Beton H-Beam 420 btg 23,834,898.50
PONDASI STRAUSZ Dia 40 - 150 ttk 332,505.50
PONDASI STRAUSZ Dia 40 - 200 ttk 442,343.43
TIANG PANCANG (PILE) SQUARE 25 (D16) m 74,182.72
Pracetak Gelagar Tipe I Bentang bh 494,483.14
Pracetak Gelagar Tipe I Bentang bh 501,714.75
Pracetak Gelagar Tipe I Bentang bh 504,266.49
Pracetak Gelagar Tipe I Bentang bh 510,222.22
Pracetak Gelagar Tipe I Bentang bh 520,006.82
Pracetak K 350 m3 195,498.45
Pracetak Voided Bentang 7 M bh 222,441.30
-
BESI BETON -
Baja Tulangan U-32, ulir kg 16,454.32
Baja Tulangan U-39, ulir kg 16,454.32
Baja Tulangan U-42, ulir kg 16,454.32
Baja Tulangan U-24, polos kg 14,903.16
Baja Tulangan U-32, polos kg 15,216.16
Wiremash 8 mm m2 72,228.06
Wiremash 6 mm m2 69,042.78
Baja Tulangan kg 11,132.12
Baja Tulangan (Ulir) D32 kg 11,132.12
Baja Tulangan U39 kg 11,132.12
Wiremesh kg 78,053.06
Kawat Beton kg 39,753.09
Kawat Beton kg 29,055.89
Besi Beton Specs: dia 10 mm btg 89,248.04
Besi Beton Specs: dia 12 mm btg 121,930.42
Besi Beton Specs: dia 16 mm btg 210,316.14
Besi Beton Specs: Kanal "U" 150mm x 75mm x 6,5mm x 6m btg 691,358.02
Besi UNP 200 Specs: Kanal "U" 150mm x 75mm x 6,5mm x 6m btg 817,059.48
-
TEGEL -
Tegel Pearlstone/Beton sikat 40 x 40 x 3 cm warna bh 33,310.89
Teraso Cor m3 1,736,251.40
Tegal Classic Stone 30 x 30 x 3 cm (Natural) bh 10,257.24
Tegal Classic Stone 30 x 30 x 3 cm (Warna) bh 11,438.83
Tegal Classic Keramik 30 x 30 x 0,06 cm m2 101,252.53
Tegal Classic Keramik 30 x 30 x 0,05 cm m2 79,858.14
Porcelein 11 x 11 warna standar DN m2 66,157.93
Porcelein 11 x 11 warna khusus DN m2 73,654.77
Keramik 10/10, 10/20, 20/20, KW I putih/polos m2 72,077.22
Keramik 10/10, 10/20, 20/20, KW I warna m2 79,443.32
Plint Keramik 5/20, corak warna, anti slip bh 1,734.68
Plint Keramik 10/20 warna bh 2,074.07
Plint Keramik cove artistik (5 x 5 x20) bh 87,804.98
Keramik dinding 10/20, corak warna, anti slip m2 79,443.32
Keramik dinding 15/15, putih polos m2 52,993.22
Keramik dinding 15/15, corak warna, anti slip m2 56,066.62
Keramik dinding 20/20, corak warna, anti slip m2 80,208.84
Keramik 20/20, KW I putih/polos m2 72,077.22
Keramik dinding 20/25, putih/polos m2 74,101.01
Keramik dinding 20/25, corak warna m2 79,518.74
Keramik lantai 30 x 30, DN putih polos m2 75,760.27
Keramik lantai 30 x 30, DN warna/corak, anti slip m2 79,443.32
Keramik lantai 40 x 40, DN warna/corak m2 99,304.15
Keramik Mozaik lantai 30 x 30 DN warna/corak, anti slip m2 84,999.33
Stairmosing keramik 10/20 m 19,687.36
Stairmosing keramik Fiber m 27,812.70
Granit alam LN ukuran besar m2 2,614,929.74
Granit alam LN ukuran kecil m2 2,179,131.58
Granit alam DN ukuran besar m2 2,098,108.19
Granit alam DN ukuran kecil m2 1,946,386.53
Lantai Vinil karet, 30 x 30 lbr 6,448.48
Lantai Vinil motif kembang, 30 x 30 lbr 8,334.01
Granito tile essenza 40 x 40 polis m2 336,138.27
Granito tile essenza 40 x 40 unpolis m2 243,697.42
Granito tile essenza 60 x 60 polis m2 434,197.98
Granito tile essenza 60 x 60 unpolis m2 312,364.35
Lantai Marmer Citatah uk. 15/30 m2 250,171.04
Lantai Marmer Citatah uk. 20/30 m2 286,769.02
Lantai Marmer Citatah uk. 30/30 m2 296,684.35
Lantai Marmer Citatah uk. 40/40 m2 204,277.44
Roman Keramik Metropolitan uk. 60/60 m2 314,253.65
Lantai Marmer Citatah uk. 100/100 m2 352,913.13
Marmer (Papan Nama Jembatan) m2 691,358.02
Tegel/Ubin Difabel Kuning Strip 30x30x3 Specs: bh 22,626.26
Tegel/Ubin Specs: Difabel Kuning Bintik 30x30x3 bh 22,626.26
-
GENTENG, NOK DAN TALANG -
Atap Genteng metal (Zinkalum) Polos tebal 0,5 mm lbr 166,680.13
Atap Genteng metal (Galvalum) Polos tebal 0,5 mm lbr 194,460.16
Atap Genteng metal (Zinkalum) Tekstur tebal 0,5 mm lbr 243,068.91
Atap Genteng metal (Galvalum) Tekstur tebal 0,5 mm lbr 263,910.21
Atap Genteng palentong pres bakar KW. I, ex Jatiwangi bh 2,212.35
Atap Genteng palentong pres Molen Oven KW. I, ex Jatiwangi bh 2,778.00
Atap Genteng Vlaams pres Molen Oven KW. I, ex Jatiwangi bh 2,236.23
Atap Genteng keramik warna Stand. KIA bh 9,025.36
Atap Genteng keramik warna Khusus. KIA bh 14,820.20
Atap Genteng bubung Pres bulat bh 7,645.16
Atap Genteng bubung Pres segi tiga bh 7,710.53
Atap Genteng kodok natural, ex jatiwangi bh 3,469.36
Atap Genteng kodok glazuur, ex jatiwangi bh 4,512.68
Atap Genteng palentong super/besar natural, ex Jatiwangi bh 4,852.08
Atap Genteng palentong super/besar glazuur, ex Jatiwangi bh 3,054.55
Atap Genteng beton natural, Rengganis bh 6,247.36
Atap Genteng beton warna 14,4/m2 m2 231,098.36
Atap Genteng beton Natural 14,4/m2 m2 139,189.23
Atap Genteng Morando natural ex Jatiwangi bh 9,025.36
Atap Genteng Morando glazuur ex Jatiwangi bh 11,451.40
Bubung genteng keramik warna Stand. KIA bh 20,225.36
Bubung genteng keramik warna Khusus. KIA bh 36,315.15
Bubung genteng metal Rainbow bh 213,080.31
Bubung genteng metal Sakura bh 209,834.70
Genteng bubung segi tiga/bulat, natural bh 2,426.04
Genteng bubung segi tiga/bulat, glazuur bh 3,054.55
Genteng bubung beton natural Rengganis bh 5,832.55
Genteng bubung beton warna Rengganis bh 7,290.68
Genteng bubung natural Morando bh 9,031.65
Genteng bubung glazuur Morando bh 12,424.33
Genteng bubung palentong besar natural bh 3,808.75
Genteng bubung palentong besar glazuur bh 6,938.72
Atap plastik gelombang, uk. 0,80 x 1,80 lbr 48,520.76
Atap aluminium, ULR - 7 (I= 920mm x 0.50 mm) m2 173,480.58
Nok atap aluminium std. m2 98,700.79
Atap sirap kelas I (1 m2 = 80 lb) lbr 3,469.36
Nok Allumunium Std m 56,565.66
-
BUIS BETON, U-DITCH, DAN BOX CULVERT -
Gorong-gorong Beton tanpatulang dia. Dalam 20-30 cm m 133,344.11
Gorong-gorong Beton bertulang dia. Dalam 45 cm m 370,442.20
Gorong-gorong Beton bertulang dia. Dalam 45-75 cm m 518,644.22
Gorong-gorong Beton bertulang dia. Dalam 75-95 cm m 815,060.83
Gorong-gorong Beton bertulang dia. Dalam 95-120 cm m 1,333,855.89
Gorong-gorong Beton bertulang dia. Dalam 120-150 cm m 2,222,401.80
Saluran air beton (U-DITCH) 20 x 50 tebal 4 cm bh 81,115.15
Saluran air beton (U-DITCH) 30 x 50 tebal 5 cm bh 111,673.18
Saluran air beton (U-DITCH) 40 x 50 tebal 6 cm bh 149,861.28
Saluran air beton (U-DITCH) 50 x 50 tebal 7 cm bh 203,347.25
Buis beton dia 20 cm - 1,00 m bh 83,189.23
Buis beton dia 30 cm - 1,00 m lbr 118,310.21
Buis beton dia 40 cm - 1,00 m bh 111,517.31
Buis beton dia 50 cm - 0,50 m m2 349,969.20
Buis beton dia 80 cm - 0,50 m lbr 410,307.16
Buis beton dia 60 cm - 0,50 m lbr 470,357.26
Buis beton dia 100 cm - 0,50 m bh 301,243.55
Buis beton dia 10 cm - 0,50 m stk 13,643.64
Buis beton dia 15 cm - 0,50 m stk 19,854.55
Buis beton dia 20 cm - 0,50 m stk 22,427.65
Buis beton dia 25 cm - 0,50 m stk 30,908.73
Pasangan Gorong-gorong Pracetak (Box Culvert) uk. 0,80/1,20 M' m 3,563,504.38
Pasangan Gorong-gorong Pracetak (Box Culvert) uk. 1,00/1,20 M' m 5,051,222.63
Pasangan Gorong-gorong Pracetak (Box Culvert) uk. 1,20/1,20 M' m 6,940,283.01
Pasangan Gorong-gorong Pracetak (Box Culvert) uk. 1,50/1,20 M' m 11,338,139.62
Pasangan Gorong-gorong Pracetak (Box Culvert) uk. 2,00/1,20 M' lbr 14,753,483.46
-
PLAT BESI/BAJA -
Plat Bondex m2 163,022.22
Besi Strip, uk. 3 x 30 mm x 6 m (4,21 kg) btg 42,185.41
Plat besi tipis 1 mm kg 21,381.82
Plat besi tipis 0,5 mm kg 25,596.59
Plat besi tipis 2 mm - 5 mm lbr 29,062.18
Plat besi tipis 5 mm - 10 mm kg 19,986.53
Plat besi tipis 10 mm ke atas kg 19,560.40
Steel Grating (Dengan Rangka Angkur) bh 4,007,696.88
Plat Baja kg 13,412.35
Pipa Baja kg 8,892,620.25
Stainless Plate m1 11,783,209.52
-
KAWAT -
Kawat Beton kg 25,793.94
Kawat duri (1 rol = 80 m' = 10 kg) m 6,938.72
Kawat Pengikat m 3,469.36
Kawat Bronjong 4 mm kg 15,700.11
Kawat Bronjong 3 mm kg 16,718.29
Kawat Tembaga kg 58,212.35
Kawat las listrik kg 83,340.07
Kawat raam m2 27,115.06
Kawat nyamuk hijau m2 22,733.11
Kawat kassa/Harmonika, uk. 2.0 x 2.0 dia 2 mm m2 42,844.09
Kawat kassa/Harmonika, uk. 3.0 x 3.0 dia 2 mm m2 40,291.09
Kawat kassa/Harmonika, uk. 4.0 x 4.0 dia 2 mm m2 40,291.09
Kawat seng galvanis, uk. 3 mm kg 24,298.09
Kawat seng galvanis, uk. 4 mm kg 27,780.02
Kawat seng galvanis, uk. 5 mm kg 27,780.02
Kawat Asbes bh 107,851.85
Kawat Las kg 39,753.09
-
MINYAK CAT/THINNER -
Soligem (1 blek = 10 liter) ltr 9,364.76
Plint coat kg 49,379.30
Dempul halus/Impra (Wood Filler) kg 58,815.71
Terpentin ltr 14,782.49
Thiner A ltr 27,302.36
Thiner B ltr 46,207.86
Kompon kg 40,291.09
Plamir tembok kg 20,828.73
Dempul kayu kg 29,967.23
Meni besi/kayu kg 28,119.42
Zinchromate m2 44,529.74
Sirlak ex India kg 201,398.88
Spirtus ltr 13,167.23
Oker putih kg 26,736.70
Oker warna kg 34,366.78
Dempul Plitur kg 50,019.12
Dempul lilin kg 10,910.89
Dempul plastik kg 43,442.42
Oten (pewarna plituran) bks 9,876.36
Plitur jadi DX ltr 36,210.82
Plitur jadi Ultran ltr 72,567.45
Minyak Pelebur Cat (Soda Api) klg 53,473.40
Thinner ltr 27,654.32
-
CONBLOCK, PAVING, KANSTEEN, DAN ACCESSORIES -
Beton conblock (CB.10) bh 10,139.08
Beton conblock (CB.15) bh 11,060.47
Beton conblock (CB.20) bh 11,719.15
Batacote kg 120,220.88
Paving block Natural 8 cm m2 89,336.03
Paving block Warna 8 cm m2 165,800.22
Paving block Natural 6 cm m2 140,257.69
Paving block Warna 6 cm m2 85,704.51
Kansteen Pavingblock bh 37,220.20
Batu pinggir beton uk. 6 x 15 x 40 cm (Kansteen) bh 55,938.41
Batu pinggir beton uk. 10 x 20 x 35 cm (Kansteen) bh 26,637.40
Grass block 45 x 30 x 8 cm bh 26,242.69
Grass block 45 x 30 x 10 cm bh 17,560.49
Con Block uk. 8 x 20 x 40 bh 4,085.30
Batu pinggir beton uk. 15 x 35 x 60 cm (K-225) bh 53,775.08
Kansteen Pavingblock 6.15.39 bh 30,104.24
Kerb Type A 16.18.28.60 bh 41,808.31
Kerb Type B 16.18.40.60 bh 73,339.26
Kerb Type C (Jalan masuk) 16.18.15.60 bh 30,558.02
Kerb Type D (Tali air) 16.18.30.60 bh 67,681.44
Kerb Type L 16.18.30.60 bh 73,212.30
Kerb Type E 20.25.30.60 bh 64,170.59
Gravel beton 1/2 U 20 cm bh 66,283.64
Gravel beton 1/2 U 30 cm bh 83,840.36
Gravel beton 1/2 U 40 cm bh 114,565.57
Paving Blok (Natural) m2 69,432.46
Kerb Jenis 1 m1 131,081.48
-
ASBES -
Atap asbes gelombang, uk. 1.05 x 1.80 x 4 mm lbr 71,991.74
Atap asbes gelombang, uk. 1.05 x 2.10 x 5 mm lbr 113,207.99
Atap asbes gelombang, uk. 1.05 x 2.40 x 4 mm lbr 75,622.00
Atap asbes gelombang, uk. 1.05 x 2.70 x 4 mm lbr 140,500.29
Atap asbes gelombang, uk. 1.05 x 3.00 x 4 mm lbr 157,710.08
Atap asbes gelombang, uk. 1.10 x 1.80 x 5 mm lbr 37,735.58
Atap asbes gelombang, uk. 1.10 x 2.00 x 5 mm lbr 91,613.74
Atap asbes gelombang, uk. 1.10 x 2.25 x 5 mm lbr 80,832.32
Atap asbes gelombang, uk. 1.10 x 2.50 x 5 mm lbr 85,704.51
Atap asbes gelombang, uk. 1.10 x 3.00 x 5 mm lbr 70,581.37
Atap asbes gelombang, uk. 1.10 x 1.80 x 6 mm lbr 55,938.41
Atap asbes gelombang, uk. 1.10 x 2.00 x 6 mm lbr 47,892.26
Atap asbes gelombang, uk. 1.10 x 2.25 x 6 mm lbr 52,492.93
Atap asbes gelombang, uk. 1.10 x 2.50 x 6 mm lbr 89,336.03
Atap asbes gelombang, uk. 1.10 x 3.00 x 6 mm lbr 99,825.81
Atap genteng asbes, uk. 0.85 x 1.15 lbr 34,718.74
Nok genteng asbes, pj. 1.15 m bh 23,904.65
Eternit asbes semen, 1.00 x 1.00 x 3,5 mm lbr 29,211.76
Eternit asbes semen, 1.00 x 1.00 x 4,0 mm lbr 15,936.43
Eternit asbes semen, 1.00 x 1.00 x 5,0 mm lbr 26,637.40
Eternit asbes semen, 1.00 x 1.00 x 6,0 mm lbr 31,249.38
-
PAKU -
Paku 1 s/d 2 1/2 cm kg 31,474.39
Paku 4 s/d 7 cm kg 23,895.85
Paku uk. 8 s/d 12 cm kg 23,895.85
Paku beton 2 s/d 5 cm cm 553.09
Paku beton 7 cm bh 892.48
Paku beton 10 cm bh 1,106.17
Paku Ramset/dinabolt bh 13,702.72
Paku anti karat u/ genteng metal (35.00 m2/kg) kg 65,838.65
Paku seng kg 42,795.06
Paku kaca kg 46,087.18
Paku eternit kg 42,795.06
Paku triplex kg 26,736.70
Paku kait lengkap bh 1,871.69
Paku cacing kg 56,262.72
Paku gipsum anti karat (20.00 m2/kg) kg 31,588.78
Paku Skrup dus 22,930.46
Paku pancing bh 887.45
Paku kg 20,740.74
-
LEM -
Lem kayu u/ HDM (1 tube/10.00 m2) m2 99,304.15
Sealent Alumunium ke Kaca tube 34,718.74
Sealent Alumunium ke dinding tube 34,718.74
Lem kuning (Aibon) kg 69,688.89
Lem putih fox kg 45,560.49
Lem bh 21,990.21
Perekat Lemkra kg 73,212.30
Perekat Sambungan Warna kg 91,515.69
Lem pcs 7,026.71
Lem pcs 12,297.37
Lem pcs 22,837.44
Lem pcs 14,518.52
Lem pcs 29,037.04
Lem pcs 43,555.56
Lem pcs 17,568.04
Lem pcs 114,188.46
Lem pcs 122,972.48
Lem pcs 10,540.07
Lem pcs 17,568.04
Lem pcs 10,540.07
Lem pcs 14,518.52
Lem plastik 16,036.99
Lem botol 29,037.04
Lem botol 43,680.00
Lem Power Glue pcs 5,270.66
Lem Power Glue pcs 7,905.36
Lem botol 2,903.70
Lem botol 9,427.61
Lem kayu u/ HDM (1 tube/10.00 m2) tube 99,304.15
Lem kuning (Aibon) kg 64,075.06
Lem putih kg 39,945.41
Lem Vinil kg 91,779.66
Lem bh 68,444.44
Lem Beton kg 107,340.25
-
AMPELAS -
AMPLAS lbr 5,028.06
-
MUR BAUT, SEKRUP, RING, ANGKUR, DAN DYNABOLT -
Duk Angker kg 26,673.85
Mur Baut HTB dia. 10 mm s/d 16 mm (5 cm) bh 22,915.38
Mur Baut biasa dia. 10 mm s/d 16 mm (5 cm) bh 14,505.95
Skrew Buah 18.313,74 Bolt M 16 x 2 - A325 bh 68,444.44
Dynabolt Atau Raamset 8 mm Panjang 4-5 cm bh 13,936.52
Baut 12 mm Panjang 2 cm bh 19,986.53
Baut 2 dus 19,560.40
Angkur Diameter 22 mm P = 800 mm set 165,925.93
-
KUSEN, PINTU DAN PAGAR -
Pagar BRC lengkap Tiang (Tanpa Pondasi) m2 290,294.95
Panel Sunscreen Aluminium Colourbond m2 89,894.14
Pintu Aluminium + kunci berikut kusen unit 611,160.49
Folding gate m2 312,518.97
Rolling door biasa, Type one sheet unit 3,819,753.09
Railing tangga besi stainless m 1,145,919.64
Guard Rill m 481,700.56
Rel Handerson lengkap bh 343,768.35
Rel Marathon 1 Pintu bh 282,652.30
Besi Pagar BRC m1 73,212.30
Pagar Dinding Pohon + Batu Tanam ls 91,515.69
Pagar Kayu Setara Jati (6 x 3) m1 67,682.69
Tiang Pagar Kayu (8 x 8), T = 100 cm batang 73,212.30
-
GYPSUM BOARD DAN KALSIBOARD -
Eternit 4 mm 100 x 100 cm m2 22,068.15
Hardflex 5 mm, uk. 120 x 240 cm lbr 80,299.35
Gipsum 120 x 240 cm ex DN lbr 96,597.80
Gipsum 120 x 240 cm ex LN lbr 133,683.50
GRC lbr 116,877.22
List Gipsump C-7 Profil m 16,806.29
List Gipsump 10 cm m 20,093.38
List Gipsump 14 cm lbr 20,093.38
Akustik Amstrong NDF. 0,60 x 1,20 x 0,015 lbr 26,347.03
Akustik Amstrong NDF. 0,30 x 0,60 x 0,015 lbr 22,068.15
Akustik Amstrong NDF. 0,30 x 0,30 x 0,015 lbr 13,186.08
Jabarwood 4 mm 1,20 x 2,40 lbr 96,597.80
Partikel board, 1.20 x 2.40 lbr 110,817.15
Soft board, 1.20 x 2.40 lbr 67,225.14
Dome Gipsump type Merak dia 85 cm bh 343,768.35
Dome Gipsump type Bunga dia 90 cm bh 420,169.70
Eternit hardflex 5 mm, uk. 1.05 x 2.40 lbr 110,817.15
-
FIBERGLASS DAN POLYCARBONAT -
Atap Fiberglass tipis, uk. 0,80 x 1,80 lbr 67,388.55
Atap Fiberglass tebal, uk. 0,80 x 1,80 lbr 136,134.68
Twinlight (2.10 x 11.80) lbr 3,384,989.45
-
PERLENGKAPAN SANITASI AIR BERSIH DAN AIR KOTOR -
Shower dengan Tiang bh 538,770.28
Shower tanpa Tiang bh 184,718.29
Kran tembok San Ei 1/2" bh 117,644.00
Kran tembok ITAP 1/2" bh 160,405.12
Kran bebek San Ei 1/2" bh 145,147.47
Kran bebek ITAP 1/2" bh 129,862.18
Kran panas/dingin Standar bh 434,059.71
Tempat sabun porselein bh 85,302.27
Floor drain San Ei bh 252,044.00
Floor drain Lokal bh 61,116.05
Wastafel lengkap + cermin bh 2,984,957.13
Wastafel bulat warna standar, lengkap bh 2,764,461.68
Wastafel lengkap + cermin, ex TOTO type L. 38 VI bh 1,422,971.94
Wastafel lengkap + cermin, ex TOTO type LW. 211 CJ bh 1,638,086.11
Wastafel lengkap + cermin, ex I N A type LW. 230 bh 534,759.15
Kloset jongkok porselen, warna bh 534,759.15
Kloset jongkok Standar putih porselen bh 315,136.07
Kloset jongkok teraso bh 84,031.43
Kloset duduk porselen TOTO, warna standard lengkap bh 3,145,936.70
Kloset duduk porselen TOTO, standard lengkap, warna tua bh 2,571,449.61
Kloset duduk porselen INA, standard lengkap, warna tua bh 1,185,754.43
Penyekat urinoir Porselein lbr 1,072,987.65
Kitchen zink stainless standar 1 lobang bh 392,276.54
Kitchen zink stainless Non standar 1 lobang bh 590,319.19
Kitchen zink stainless Non standar 2 lobang bh 2,047,424.11
Bak mandi fibre glass, uk. Kecil bh 347,250.28
Bak mandi fibre glass, uk. Besar bh 451,419.08
Bak mandi Teraso bh 211,211.13
Badkip TOTO, FB. 1500/1700 STD bh 5,275,621.10
Bak cuci piring teraso bh 153,799.51
-
GEOTEKSTILE -
Geotextile m2 42,009.43
Geotextile Non Woven Polypropyline (gramasi 300gr) - Kelas 3 m2 9,937.96
Geotextile Non Woven Polypropyline (gramasi 400gr) - Kelas 2 m2 12,790.12
Geotextile Non Woven Polypropyline (gramasi 600gr) - Kelas 1 m2 11,783,209.52
Geotextile Woven Polypropyline (gramasi 150gr) - Kelas 3 m2 9,161.12
Geotextile Woven Polypropyline (gramasi 200gr) - Kelas 2 m2 11,235.20
Geotextile Woven Polypropyline (gramasi 250gr) - Kelas 1 m2 10,802.78
-
BETON READY MIX -
Lantai Kerja Beton K-100 m3 1,173,816.57
Beton K-125 m3 772,851.54
Beton K-150 m3 1,297,690.33
Beton K-175 m3 848,501.19
Beton K-200 m3 842,366.96
Beton K-225 m3 869,969.74
Beton K-250 m3 2,051,848.80
Beton K-275 m3 2,817,975.31
Beton K-300 m3 929,261.86
Beton K-325 m3 934,372.88
Beton K-350 m3 950,730.42
Beton Siklop m3 12,203,396.81
Biaya Pompa Ready Mix m3 76,671.60
Beton Ready Mix K-600 m3 1,120,374.59
Beton Ready Mix K-500 m3 1,120,374.59
Beton Ready Mix K-450 m3 1,086,344.69
Beton Ready Mix K-400 m3 1,069,328.48
Beton Ready Mix K-350 m3 1,039,552.32
Beton Ready Mix K-250 m3 1,034,021.46
Beton Ready Mix K-175 m3 1,016,155.51
Beton Ready Mix K-125 kg 997,013.69
Beton K-175 m3 2,028,146.53
Beton K-175 m3 2,780,227.16
Beton K-300 m3 2,863,574.15
Beton K-300 m3 863,835.38
Beton Manhole K350 m3 1,888,176.31
-
BAHAN BANGUNAN LAINNYA -
Soda Coustic kg 24,309.41
Wallpaper (kelas menengah) m2 76,388.78
Wallpaper biasa, uk. 0.50 x 10.00 m rol 142,847.14
Wallpaper corak, uk. 0.50 x 10.00 m rol 336,138.27
Acrylic (1.40 x 2.50) lbr 916,740.74
Lantai kayu (gymfloor) m2 208,350.17
Floor Hardener kg 22,915.38
Lantai Parquet motif jati uk. 1.2 x 5.0 x 25.00 cm m2 289,690.33
Lantai Parquet motif jati uk. 1.2 x 5.0 x 30.00 cm m2 175,617.51
Flooring Jati uk. 1.50 x 9.0 x 60/90 - 105.00 cm m2 513,542.00
Flooring Dedan uk. 1.50 x 9.0 x 60/75/90.00 cm m2 147,900.34
Karpet ex. Lokal, Long life (l = 4.00 m) m 92,428.28
Karpet ex. Lokal, Wonder (l = 4.00 m) m 252,094.28
Karpet ex. Lokal, Dinasty (l = 4.00 m) m 126,040.85
Lantai kayu HDM ex Germany uk. 18.50 x 118.40 x 7.00 cm m2 452,927.50
Klem Stang komplit bh 504,201.12
Isolasi besar bh 10,433.22
Waterstop Lebar 150 mm roll 2,242,398.38
Waterstop Lebar 200 mm roll 2,809,027.88
Waterstop Lebar 220 - 320 mm roll 3,294,685.52
Penggantung Plafond bh 23,401.84
Shear Connector bh 31,425.36
Hook Panjang Komplit Dg. Ring bh 2,136.92
Venetion Blind dan Vertical Blind m2 270,258.14
Seal Tape bh 1,571.27
Alumunium foil roll 408,200.40
Alumunium foil, uk. 1.25 x 60.00 m m2 4,852.08
Alumunium foil, uk. 2.50 x 60.00 m m2 6,586.76
Air PDAM m3 11,112.01
Ijuk (20 kg/m2) kg 17,359.37
Slang plastik untuk waterpass dia 0,5 cm m2 3,469.36
Karbit m 20,828.73
Ayakan Sortiran bh 65,239.06
Waterpass Allumunium 60 cm bh 85,137.60
Got beton 1/2 diameter 20 cm m' 86,419.75
Got beton 1/2 diameter 30 cm m' 104,395.06
Cat, dan bahan lainnya m2 62,850.73
Bahan Pengawet Kreosot ltr 9,383.61
Pengantung ls 22,814.81
Kabel Prategang kg 17,339.26
Dudukan, Mur, Baut Dll set 62,850.73
Casing m2 37,065.59
Bearing Pad 450 x 500 x 60 mm bh 2,039,506.17
Baut, Mur, Dll kg 13,343.21
Air ltr 14,987,192.64
Sewa Pasir Specs: (50% Harga Pasir) m3 51,851.85
Pondasi Tiang Lampu ls 94,276.09
Isolasi besar bh 10,516.18
Ram Kawat Penutup Lampu Tanam bh 18,855.22
Vinyl Permalium m2 622,222.22
HCL/Air Keras ltr 35,770.86
Abu/Bubuk Genteng Specs: (1 krg - 50 kg) krg 49,652.08
Rubber Tile Floor Specs: t. 2 cm m2 342,361.75
Aspal Bag @25 Kg bag 370,819.30
Borderan bh 25,140.29
Head Flash Light bh 62,850.73
Bloor Flash Light bh 125,701.46
Masker Biasa bh 28,911.34
Lampu Senter (Charger) bh 235,061.73
Head Flash Light bh 89,880.31
Lampu Pengaman Lalu Lintas 3" bh 103,703.70
Terpal Kanvas bh 2,262,626.26
Plang Pengaman Jalan bh 477,665.54
Barrier Jalan bh 1,255,477.26
Meteran 5 m bh 16,969.70
Meteran Rol 30 m (Pita) bh 103,703.70
Meteran Rol 50 m bh 116,902.36
Meteran Roda Digital bh 3,142,536.48
Singkup Gagang Besi bh 1,131,313.13
Singkup Saluran bh 81,705.95
Singkup Gagang Kayu bh 81,705.95
Cangkul bh 94,276.09
Linggis Besar bh 125,701.46
Balincong bh 125,701.46
Belehem bh 94,276.09
Leker Besi bh 95,533.11
Gacok 4 Gigi Gagang Pendek Besi bh 116,902.36
Gacok 4 Gigi Gagang Panjang Kayu bh 54,051.63
Plat Eiser Specs: (0,06 x 1,2 x 2,4)m bh 1,476,992.14
Patik bh 144,556.68
Kampak bh 113,131.31
Palu 10 kg Martil bh 138,271.60
Bakrik dengan gagang Besi 3m bh 1,162,738.50
Bakrik dengan gagang Kayu 3m bh 62,850.73
Palu 2,5 kg bh 119,416.39
Palu 5 kg bh 138,271.60
Parang bh 27,654.32
Golok baja bh 169,696.97
Gotongan Aspal pasang 179,753.09
Sapu Lidi Ikat Besar bh 22,626.26
Sikat Injuk bh 15,185.99
Sikat Kawat Baja bh 13,827.16
Gergaji Kayu bh 138,271.60
Gergaji Besi bh 169,696.97
Pengki Karet bh 13,827.16
Pengki Plat bh 61,593.71
Pita Pengaman m 5,656.57
Palu Timbris 10 kg bh 339,393.94
Kikir Besi bh 34,567.90
Ember Karet Besar bh 12,444.44
List Allumunium m1 11,313.13
HPL lbr 94,276.09
Jet Shower set 710,213.24
Fix Shower ex TOTO tx422SC set 2,104,648.44
Mix Shower tx417SBCBR set 4,072,159.10
Sanding sealler kg 82,257.78
Rel Pintu Geser set 125,701.46
Profil kayu jati m1 414,814.81
Skrup gypsum bh 1,131.31
Finishing Melamic m1 167,308.64
Profil Kayu Samarinda m1 13,198,653.20
Marmer Travertine m2 1,623,136.43
Calsiplank m1 1,099.89
Path Lock set 61,163.82
Floor Hinge set 1,797,422.76
Lever handle set 655,494.14
Lockcase set 107,160.49
Escutheon set 52,240.27
Flush Bolt set 217,904.74
Rambucis set 20,640.18
Engsel Casement set 144,302.76
Door Holder set 70,450.64
NYM 3 X 2,5 m1 17,341.77
Inbow-dus bh 5,656.57
Stop kontak bh 19,815.58
Saklar Engkel bh 28,282.83
Saklar Seri bh 34,567.90
Lampu SL Philip 25 Watt bh 119,416.39
Fiting Lampu bh 21,997.76
Lampu TL 18 watt + Asesories bh 15,638.52
Lampu TL 36 watt + Asesories bh 314,253.65
Lampu DL Philip 18 Watt bh 80,222.67
Kran wastafel bh 1,514,702.58
Kran wudhu bh 345,679.01
Sticker Sunblast m2 81,705.95
Lampu Gantung LED 20 watt EX. Philips bh 554,343.43
Lampu TL LED 12 watt EX. Philips bh 46,509.54
Lampu TL LED 20 watt EX. Philips bh 50,280.58
Lampu Down Light LED 8 watt EX. Philips bh 55,308.64

KAYU
Bambu dia 5 - 7 cm btg 31,249.38
Bambu dia 7 - 10 cm btg 45,139.39
Bambu Gombong btg 70,128.84
Kayu Terentang m3 6,539,013.78
Kayu kamper Singkil/Kapur m3 12,363,664.92
Kayu balok Borneo super m3 6,187,993.71
Kayu papan Borneo super m3 7,149,182.49
Kayu balok kamper Medan m3 13,667,747.16
Kayu papan kamper Medan m3 14,442,568.44
Kayu balok kamper Banjar m3 13,381,210.68
Kayu papan kamper Banjar m3 13,907,640.85
Kayu balok kamper Samarinda m3 18,580,899.30
Kayu papan kamper Samarinda m3 13,049,893.06
Kayu balok Rasamala m3 8,021,685.12
Kayu Jati Jateng Tua lepas Mata dari 80 cm ke atas m3 50,035,077.35
Kayu Jati Jabar Tua lepas Mata dari 80 cm ke atas m3 23,720,657.24
Kayu Jati Jabar 40 cm ke atas m3 21,985,222.90
Kayu balok Albasia m3 2,368,240.63
Kayu papan Albasia m3 2,521,030.75
Dolken dia 5 s/d 7 cm btg 51,531.31
Dolken dia 8 s/d 10 cm btg 41,104.38
List profil kayu kamper 1 cm m 9,673.98
List profil kayu kamper 2 cm m 6,259.93
List profil kayu kamper 4 cm m 7,894.05
List profil kayu kamper 5 cm m 10,609.20
List profil kayu kamper 10 cm m 31,085.97
Pegangan tangga (Balustrade) profil jati m 337,461.91
Pegangan tangga (Balustrade) Kamper Banjar m 105,972.62
Reng uk. 2/3 kayu Borneo Super m3 7,149,182.49
Reng uk. 2/3 kayu Kamper Banjar m3 8,822,935.13
Reng uk. 3/4 kayu Kamper Banjar m3 8,822,935.13
Kayu kaso Borneo, uk. 5/7 m3 7,149,182.49
Bilik bambu (Tanpa kulit) ukuran 2 x 2,50 m lbr 38,229.58
Bilik bambu (Dengan kulit) ukuran 2 x 2,50 m lbr 112,603.37
Bilik bambu hitam Variasi m2 63,808.57
Multiplek 9 mm, uk. 1,20 x 2,40 lbr 190,978.23
Multiplek 12 mm, uk. 1,20 x 2,40 lbr 244,464.20
Multiplek 18 mm, uk. 1,20 x 2,40 lbr 481,822.49
Plywood 18 mm, uk. 1,20 x 2,40 lbr 449,194.16
Plywood 9 mm, uk. 1,20 x 2,40 lbr 294,761.12
Taekwood 3 mm, uk. 1,20 x 2,40 lbr 205,564.62
Taekwood 4 mm, uk. 1,20 x 2,40 lbr 264,165.39
Taekwood 4 mm, ukuran pintu lbr 156,918.16
Triplek 3 mm 1,20 x 2,40 lbr 65,691.58
Triplek 4 mm 1,20 x 2,40 lbr 80,976.88
Triplek 4 mm, ukuran pintu lbr 86,598.25
Triplex 6 mm 1,20 x 2,40 lbr 174,125.43
Melamin 4 mm, uk. 1,20 x 2,40 lbr 162,405.03
Melamin TIK 4 mm lbr 297,651.00
Formika putih polos, uk. 1,20 x 2,40 lbr 327,415.85
Formika motif, ukuran pintu lbr 209,285.39
Kayu Bakar m3 565,656.57
Kay Perancah m3 4,864,728.17
Kayu Acuan m3 2,488,888.89
Cerucuk (Kayu Galam Dia. 10 cm) m1 12,098.77
Kayu Kaso btg 14,455.67
Usuk 4 x 6 kayu meranti m3 5,530,864.20

LOGAM/METALURGI
Allumunium plat 0,25 mm (1.00 x 2.00) lbr 58,815.71
Allumunium plat 0,30 mm (1.00 x 2.00) lbr 69,450.06
Allumunium plat 0,40 mm (1.00 x 2.00) lbr 76,388.78
Allumunium plat 0,50 mm (1.00 x 2.00) lbr 91,674.07
Allumunium plat 0,60 mm (1.00 x 2.00) lbr 114,589.45
Allumunium profil uk. 3"4.00 m (bahan kusen) ex. EDICO Natural btg 259,736.92
Allumunium profil uk. 4"4.00 m (bahan kusen) ex. EDICO Natural btg 297,937.60
Allumunium profil uk. 3"4.00 m (bahan kusen) ex. EDICO Warna btg 275,022.22
Allumunium profil uk. 4"4.00 m (bahan kusen) ex. EDICO Warna btg 305,580.25
Allumunium profil uk. 3"4.00 m (bahan kusen) ex. YKK Natural btg 290,294.95
Allumunium profil uk. 4"4.00 m (bahan kusen) ex. YKK Natural btg 488,928.40
Allumunium profil uk. 3"4.00 m (bahan kusen) ex. YKK Warna btg 339,192.82
Allumunium profil uk. 4"4.00 m (bahan kusen) ex. YKK Warna btg 499,223.34
Allumunium daun pintu/Jendela m 69,060.38
Allumunium sheet m2 104,168.80
Allumunium profil "T" 4.00 m (bahan rangka plafond) btg 22,918.52

ALAT LISTRIK
Kabel power m 8,396.86
Kabel elektroda m 12,984.96
Kabel NYFGBY 4 x 10 qmm (Supreme) roll 178,760.04
Kabel NYFGBY 4 x 25 qmm (Supreme) roll 319,382.27
Kabel NYM 2 x 2,5 qmm "Prime/Eterna" m 11,056.70
Kabel TIC 2 x 10 qmm "SPLN" Lokal m 8,246.02
Kabel Gulung [CR-2810] Specs: Kabel Roll 10M (dgn arde) bh 172,839.51
Kabel Gulung [CR-2815] Specs: Kabel Roll 15M (dgn arde) bh 214,320.99
Kabel NYM Specs: 2 x 1,5 sqmm m 10,056.12
Kabel NYM Specs: 2 x 2,5 sqmm m 12,167.90
Kabel NYM Specs: 3 x 1,5 sqmm m 10,555.15
Kabel NYM Specs: 3 x 2,5 sqmm m 14,241.98
Kabel NYY Specs: 2 x 1,5 sqmm m 8,346.58
Kabel NYY Specs: 3 x 1,5 sqmm m 10,555.15
Kabel NYY Specs: 3 x 4 sqmm m 33,461.73
Kabel NYY Specs: 3 x 6 sqmm m 39,470.26
Kabel NYFGBY Specs: 2 X 10 sqmm m 102,446.69
Kabel Nya 2,5 Sqmm m 4,730.15
Kabel NYY 4 x 35 mm2 m 220,113.31
Kabel NYY 4 x 6 mm2 m 123,853.65
Kabel NYYHY 3 x 2.5 mm2 m 38,244.67
Kabel Nyfgby 4 x 50 mm2 m 456,296.30
Kabel NYMHY 3 x 1,5 tunggal Specs: 50 meter roll 439,955.11
Kabel NYMHY 3 x 2,5 tunggal Specs: 50 meter roll 565,656.57
Kabel NYMHY 3 x 0,75 (putih) Specs: 50 meter roll 289,113.36
Lampu pijar 25 watt s/d 100 watt bh 27,780.02
Lampu Neon TL 20 watt bh 104,168.80
Lampu Neon TL 40 watt bh 125,010.10
Down Light + SL 25 watt bh 267,379.57
Lampu Sirkel TL 20 watt Lengkap bh 97,230.08
Lampu Mercury 80 watt bh 243,068.91
Lampu Mercury 400 watt bh 1,489,700.56
Lampu Taman + Tiang + Lampu 1 buah bh 588,232.55
Lampu Baret 30 cm + Neon bh 504,201.12
Lampu Neon Acrylik 2 x 40 watt bh 343,768.35
Lampu SON 250W/220V "PHILIPS" bh 198,922.56
Lampu SON 150W/220V "PHILIPS" bh 172,336.70
Lampu HPL 250W/220V "PHILIPS" bh 90,756.45
Lampu HPL 150W/220V "PHILIPS" bh 41,242.65
Lampu HPL 80W/220V "PHILIPS" bh 41,242.65
Lampu LHE 40W/220V "HITACHI" bh 186,088.44
Lampu LHE 85W/220V "SINYOKU" bh 366,696.30
Lampu LU 250W/220V (Integral Ignitor) Komplit "GE" bh 364,157.13
Stop Kontak 1 Lubang [6130] Specs: Stop Kontak 1 Lb, Tanpa Kabel bh 13,827.16
Stop Kontak 2 Lubang [1542011] Specs: Stop Kontak 2 Lb, Tanpa Kabel, Cream bh 41,481.48
Stop Kontak 4 Lubang [15340] Specs: Stop Kontak 4 Lb, Tanpa Kabel, Cream bh 65,679.01
Stop Kontak 5 Lubang [15351] Specs: Stop Kontak 5 Lb, Cream bh 131,358.02
Lasdop Putar Connector SW2 (2,5 MM) bh 1,257.01
T-Dos PVC bh 4,399.55
Isolasi untuk Listrik National bh 5,028.06
Pipa Paralon 5/8' untuk Listrik Union ljr 4,713.80
Sticker Sanblast Merk Takki Kosai dan Decolux lebar 120 cm m 81,705.95
Spandek 0.35 mm m2 87,991.02
Print Out Lapis Vinyl m2 113,131.31
Floor Hinges set 1,037,037.04
Overpanel set 666,217.73
Top patch fitting set 100,561.17
Bottom patch fitting set 170,953.98
pull handle paloma bh 659,932.66
Keramik Homogeneus Tile 60x60 cm Black Granito-Salsa m2 663,703.70
Keramik Homogeneus Tile 60x60 cm Black Granito-Salsa Unpolished m2 605,629.63
Cotton plaster bh 8,799.10
Compoun Zak 94,276.09
Pipa PVC 4" berlubang jenis AW m 18,855.22
Rol cat bh 105,589.23
Steger werk (biaya penyusutan pakai) unit 37,710.44
Ampelas lbr 6,285.07
Pipa PVC dia 4" AW m 19,944.63
Pipa PVC Ø 4" (AW) m 67,983.54
Pipa pvc Ø 1/2" (AW) Wavin m 5,656.57
Cat Semprot DITON CHROME ALUMINIUM 300cc btl 50,280.58
Addictive Silicafum kg 20,000.00
Addictive Super btl 30,000.00
Electode Las kg 49,000.00
Hot Dip Galvanized kg 3,000.00
DAFTAR HARGA SATUAN UPAH

HARGA
NO. JENIS KEAHLIAN SATUAN
(Rp.)
a b c d
1 Pekerja orang/hari (8 jam) 100,000
2 Tukang Kayu orang/hari (8 jam) 150,000
3 Kepala Tukang Kayu orang/hari (8 jam) 180,000
4 Tukang Batu orang/hari (8 jam) 150,000
5 Kepala Tukang Batu orang/hari (8 jam) 180,000
6 Tukang Batu orang/hari (8 jam) 150,000
7 Kepala Tukang Batu orang/hari (8 jam) 180,000
8 Tukang Besi orang/hari (8 jam) 150,000
9 Kepala Tukang Besi orang/hari (8 jam) 180,000
10 Tukang Cat orang/hari (8 jam) 150,000
11 Kepala Tukang Cat orang/hari (8 jam) 180,000
12 Tukang Listrik orang/hari (8 jam) 150,000
13 Kepala Tukang Listrik orang/hari (8 jam) 180,000
14 Tukang Las orang/hari (8 jam) 150,000
15 Kepala Tukang Listrik Las orang/hari (8 jam) 180,000
16 Mandor orang/hari (8 jam) 200,000
17 Supir Truk orang/hari (8 jam) 150,000
18 Kenek Truk orang/hari (8 jam) 130,000
19 Operator Alat Berat orang/hari (8 jam) 255,000
20 Pembantu Operator Alat Berat orang/hari (8 jam) 170,000
21 Operator Alat Pipa orang/hari (8 jam) 200,000
22 Pembantu Operator Alat Pipa orang/hari (8 jam) 130,000
23 Operator Jaringan Network Internet orang/hari (8 jam) 200,000
24 Pembantu Operator Jaringan Internet orang/hari (8 jam) 180,000
25 Penjaga Malam orang/hari (8 jam) 100,000
26 Surveyor orang/hari (8 jam) 200,000
DAFTAR HARGA BAHAN / MATERIAL

NO. NAMA BAHAN SATUAN HARGA SATUAN SUMBER REFERENSI HARGA


136 Lampu Gantung LED 20 watt EX. Philips bh 554,343
137 Lampu TL LED 12 watt EX. Philips bh 46,510
138 Lampu TL LED 20 watt EX. Philips bh 50,281
139 Lampu Down Light LED 8 watt EX. Philips bh 55,309
48 Lasdop Putar Connector SW2 (2,5 MM) bh 1,257
49 T-Dos PVC bh 4,400
50 Isolasi untuk Listrik National bh 5,028
51 Pipa Paralon 5/8' untuk Listrik Union ljr 4,714
52 Sticker Sanblast Merk Takki Kosai dan Decolux lebar 120 cm m 81,706
53 Spandek 0.35 mm m2 87,991
54 Print Out Lapis Vinyl m2 113,131
55 Floor Hinges set 1,037,037
56 Overpanel set 666,218
57 Top patch fitting set 100,561
58 Bottom patch fitting set 170,954
59 pull handle paloma bh 659,933
60 Keramik Homogeneus Tile 60x60 cm Black Granito-Salsa m2 663,704
61 Keramik Homogeneus Tile 60x60 cm Black Granito-Salsa Unpolished m2 605,630
62 Cotton plaster bh 8,799
63 Compoun Zak 94,276
64 Pipa PVC 4" berlubang jenis AW m 18,855
65 Rol cat bh 105,589
66 Steger werk (biaya penyusutan pakai) unit 37,710
67 Ampelas lbr 6,285
68 Pipa PVC dia 4" AW m 19,945
69 Pipa PVC Ø 4" (AW) m 67,984
70 Pipa pvc Ø 1/2" (AW) Wavin m 5,657
71 Cat Semprot DITON CHROME ALUMINIUM 300cc btl 50,281
DAFTAR HARGA BAHAN / MATERIAL

NO. NAMA BAHAN SATUAN HARGA SATUAN SUMBER REFERENSI HARGA


a b c d e
136 Lampu Gantung LED 20 watt EX. Philips bh 554,343 Tokopedia
137 Lampu TL LED 12 watt EX. Philips bh 46,510 Tokopedia
138 Lampu TL LED 20 watt EX. Philips bh 50,281 Tokopedia
139 Lampu Down Light LED 8 watt EX. Philips bh 55,309 Tokopedia
48 Lasdop Putar Connector SW2 (2,5 MM) bh 1,257 Bukalapak
49 T-Dos PVC bh 4,400 Tokopedia
50 Isolasi untuk Listrik National bh 5,028 Shopee
51 Pipa Paralon 5/8' untuk Listrik Union ljr 4,714 Tokopedia
52 Sticker Sanblast Merk Takki Kosai dan Decolux lebar 120 cm m 81,706 https://stickersandblast.com
53 Spandek 0.35 mm m2 87,991 Tokopedia
54 Print Out Lapis Vinyl m2 113,131 Tokopedia
55 Floor Hinges set 1,037,037 Tokopedia
56 Overpanel set 666,218 Tokopedia
57 Top patch fitting set 100,561 Tokopedia
58 Bottom patch fitting set 170,954 Tokopedia
59 pull handle paloma bh 659,933 Tokopedia
60 Keramik Homogeneus Tile 60x60 cm Black Granito-Salsa m2 663,704 Depo Bangunan
61 Keramik Homogeneus Tile 60x60 cm Black Granito-Salsa Unpolished m2 605,630 Depo Bangunan
62 Cotton plaster bh 8,799 Depo Bangunan
63 Compoun Zak 94,276 Depo Bangunan
64 Pipa PVC 4" berlubang jenis AW m 18,855 Depo Bangunan
65 Rol cat bh 105,589 Depo Bangunan
66 Steger werk (biaya penyusutan pakai) unit 37,710 Depo Bangunan
67 Ampelas lbr 6,285 Depo Bangunan
68 Pipa PVC dia 4" AW m 19,945 Depo Bangunan
69 Pipa PVC Ø 4" (AW) m 67,984 Depo Bangunan
70 Pipa pvc Ø 1/2" (AW) Wavin m 5,657 Tokopedia
71 Cat Semprot DITON CHROME ALUMINIUM 300cc btl 50,281 Tokopedia

SNI 1745-1989-F, SNI 03-3987-


1995,NFPA 13. Standard For the
Installation Of Sprinkler Systems. 2013
72 Pengadaan dan Pemasangan Instalasi Sprinker m2 345,000 Edition. National Fire Protection
Association, dan Kegiatan Pemasangan
Instalasi Sprinker di Gedung Kantor
Bappenas 2019.
DAFTAR HARGA BAHAN / MATERIAL

NO. NAMA BAHAN SATUAN HARGA SATUAN SUMBER REFERENSI HARGA


a b c d e
I ASPAL
1 Hotmix ton 1,071,687 Buku Jurnal Edisi 39 Tahun 2020
2 Aspal drum 155 kg drum 1,500,000 Buku Jurnal Edisi 39 Tahun 2020
3 Aspal Curah kg 8,500 Buku Jurnal Edisi 39 Tahun 2020
4 Aspal Emulsi kg 5,566 Buku Jurnal Edisi 39 Tahun 2020
5 Aspal Minyak kg 6,395 Buku Jurnal Edisi 39 Tahun 2020
6 Asbuton Halus ton 1,036,133 Buku Jurnal Edisi 39 Tahun 2020
7 Aspal kg 5,254 Buku Jurnal Edisi 39 Tahun 2020
8 Aspal Karet kg 84,123 Buku Jurnal Edisi 39 Tahun 2020
9 Semen, Mortas, dan Kapur - Buku Jurnal Edisi 39 Tahun 2020
10 Semen Tiga Roda zak 76,210 Buku Jurnal Edisi 39 Tahun 2020
11 Semen putih zak 96,130 Buku Jurnal Edisi 39 Tahun 2020
12 Semen warna kg 17,974 Buku Jurnal Edisi 39 Tahun 2020
13 Semen Merah (Bubuk Bata) m3 52,537 Buku Jurnal Edisi 39 Tahun 2020
14 Kapur Pasang/Kapur tembok m3 11,404 Buku Jurnal Edisi 39 Tahun 2020
15 Semen/PC (50kg) zak 76,817 Buku Jurnal Edisi 39 Tahun 2020
16 Semen/PC (kg) kg 2,000 Buku Jurnal Edisi 39 Tahun 2020
17 Semen Khusus kg 5,522 Buku Jurnal Edisi 39 Tahun 2020
18 Semen (Pc) (Untuk Mortar) kg 1,661 Buku Jurnal Edisi 39 Tahun 2020
19 Chipping kg 251 Buku Jurnal Edisi 39 Tahun 2020

II KACA
1 Kaca polos 2 mm m2 69,203 Buku Jurnal Edisi 39 Tahun 2020
2 Kaca polos 3 mm m2 104,280 Buku Jurnal Edisi 39 Tahun 2020
3 Kaca polos 5 mm m2 133,700 Buku Jurnal Edisi 39 Tahun 2020
4 Kaca polos 8 mm m2 132,215 Buku Jurnal Edisi 39 Tahun 2020
5 Kaca Buram 12 mm Tempered m2 460,000 Buku Jurnal Edisi 39 Tahun 2020
6 Kaca raybend 5 mm m2 212,710 Buku Jurnal Edisi 39 Tahun 2020
7 Kaca raybend 8 mm m2 333,512 Buku Jurnal Edisi 39 Tahun 2020
8 Kaca es 3 mm m2 155,580 Buku Jurnal Edisi 39 Tahun 2020
9 Kaca es 5 mm m2 218,790 Buku Jurnal Edisi 39 Tahun 2020
10 Kaca patri ex lokal terpasang m2 1,623,913 Buku Jurnal Edisi 39 Tahun 2020
11 Kaca patri ex Luar Negeri terpasang m2 5,348,200 Buku Jurnal Edisi 39 Tahun 2020
12 Glass Block 20 x 20 cm (ex. Luar) bh 116,900 Buku Jurnal Edisi 39 Tahun 2020
13 Glass Block 20 x 20 cm (ex. DN) bh 30,600 Buku Jurnal Edisi 39 Tahun 2020
14 Kaca Cermin 5 mm m2 182,320 Buku Jurnal Edisi 39 Tahun 2020
15 Profil Kaca m 4,311 Buku Jurnal Edisi 39 Tahun 2020

III PASIR DAN TANAH


1 Tanah Urug m3 106,420 Buku Jurnal Edisi 39 Tahun 2020
2 Tanah gembur Lembang m3 173,244 Buku Jurnal Edisi 39 Tahun 2020
3 Pasir urug m3 110,500 Buku Jurnal Edisi 39 Tahun 2020
4 Pasir batu (sirtu) tersaring m3 181,830 Buku Jurnal Edisi 39 Tahun 2020
5 Sirtu m3 161,845 Buku Jurnal Edisi 39 Tahun 2020
6 Pasir pasang m3 149,480 Buku Jurnal Edisi 39 Tahun 2020
7 Pasir beton m3 232,640 Buku Jurnal Edisi 39 Tahun 2020
8 Pasir Aspal m3 256,647 Buku Jurnal Edisi 39 Tahun 2020
9 Abu batu m3 173,310 Buku Jurnal Edisi 39 Tahun 2020
10 Material Agregat Kelas A m3 160,220 Buku Jurnal Edisi 39 Tahun 2020
11 Material Agregat Kelas B m3 132,600 Buku Jurnal Edisi 39 Tahun 2020
12 Urugan Pilihan Pasir (Untuk Mortar) m3 82,870 Buku Jurnal Edisi 39 Tahun 2020
13 Mat. Pilihan m3 133,561 Buku Jurnal Edisi 39 Tahun 2020
14 Agregat Pilihan Kelas C m3 38,500 Buku Jurnal Edisi 39 Tahun 2020
15 Pasir m3 99,000 Buku Jurnal Edisi 39 Tahun 2020
16 Tanah subur/gembur m3 74,643 Buku Jurnal Edisi 39 Tahun 2020
17 Pasir Selica Specs: Mesh 4-8 mili kg 4,290 Buku Jurnal Edisi 39 Tahun 2020
IV BATU
1 Kerikil m3 206,300 Buku Jurnal Edisi 39 Tahun 2020
2 Batu gosok (apung) kg 14,142 Buku Jurnal Edisi 39 Tahun 2020
3 Batu pecah mesin 1/2:1 m3 251,410 Buku Jurnal Edisi 39 Tahun 2020
4 Batu pecah mesin 1:2 m3 234,770 Buku Jurnal Edisi 39 Tahun 2020
5 Batu pecah mesin 2:3 m3 215,600 Buku Jurnal Edisi 39 Tahun 2020
6 Batu pecah mesin 3:5 m3 219,984 Buku Jurnal Edisi 39 Tahun 2020
7 Batu pecah 5:7 m3 201,128 Buku Jurnal Edisi 39 Tahun 2020
8 Batu pecah 7:10 m3 157,690 Buku Jurnal Edisi 39 Tahun 2020
9 Batu pecah 10:15 m3 124,920 Buku Jurnal Edisi 39 Tahun 2020
10 Batu belah pondasi m3 124,890 Buku Jurnal Edisi 39 Tahun 2020
11 Batu Bronjong m3 144,561 Buku Jurnal Edisi 39 Tahun 2020
12 Batu Koral Beton Kali m3 163,650 Buku Jurnal Edisi 39 Tahun 2020
13 Batu templek Hitam m2 157,131 Buku Jurnal Edisi 39 Tahun 2020
14 Batu pinggir beton 10x20x35 (Kansteen) bh 16,761 Buku Jurnal Edisi 39 Tahun 2020
15 Batu pinggir beton 10x20x35 (K-225) bh 43,997 Buku Jurnal Edisi 39 Tahun 2020
16 Batu Telor m3 131,990 Buku Jurnal Edisi 39 Tahun 2020
17 Batu templek hijau m2 72,930 Buku Jurnal Edisi 39 Tahun 2020
18 Batu templek Palimanan m2 66,850 Buku Jurnal Edisi 39 Tahun 2020
19 Batu pearlstone warna kg 9,430 Buku Jurnal Edisi 39 Tahun 2020
20 Batu granit kg 7,650 Buku Jurnal Edisi 39 Tahun 2020
21 Batu Andesit ukuran 20 x 40 x 8 cm m2 198,900 Buku Jurnal Edisi 39 Tahun 2020
22 Batako kecil uk. 8 x 10 x 20 bh 1,048 Buku Jurnal Edisi 39 Tahun 2020
23 Batako besar uk. 8 x 20 x 40 bh 2,720 Buku Jurnal Edisi 39 Tahun 2020
24 Batu merah bakar kelas I bh 880 Buku Jurnal Edisi 39 Tahun 2020
25 Batu merah bakar kelas II bh 720 Buku Jurnal Edisi 39 Tahun 2020
26 Batu merah oven (klingker) bh 1,820 Buku Jurnal Edisi 39 Tahun 2020
27 Batako berlobang (HB. 10) bh 3,030 Buku Jurnal Edisi 39 Tahun 2020
28 Batako berlobang (HB. 15) bh 3,880 Buku Jurnal Edisi 39 Tahun 2020
29 Batako berlobang (HB. 20) bh 4,860 Buku Jurnal Edisi 39 Tahun 2020
30 Batu rooster, uk. 20 x 20 cm bh 6,560 Buku Jurnal Edisi 39 Tahun 2020
31 Beton dekoratif, uk. 10 x 20 x 40 bh 10,056 Buku Jurnal Edisi 39 Tahun 2020
32 Batu krawang bh 9,110 Buku Jurnal Edisi 39 Tahun 2020
33 Batu paras m2 82,870 Buku Jurnal Edisi 39 Tahun 2020
34 Batu Kali m3 113,929 Buku Jurnal Edisi 39 Tahun 2020
35 Agregat Kasar m3 174,631 Buku Jurnal Edisi 39 Tahun 2020
36 Agregat Halus m3 174,631 Buku Jurnal Edisi 39 Tahun 2020
37 Bahan Agr.Base Kelas A m3 181,500 Buku Jurnal Edisi 39 Tahun 2020
38 Bahan Agr.Base Kelas B m3 181,500 Buku Jurnal Edisi 39 Tahun 2020
39 Bahan Agr.Base Kelas C m3 99,000 Buku Jurnal Edisi 39 Tahun 2020
40 Batu Belah / Kerakal m3 143,000 Buku Jurnal Edisi 39 Tahun 2020
41 Bahan Tanah Timbunan m3 25,300 Buku Jurnal Edisi 39 Tahun 2020
42 Agregat Pecah Mesin 0-5 mm m3 159,500 Buku Jurnal Edisi 39 Tahun 2020
43 Agregat Pecah Mesin 5-10 mm & 10-20 mm m3 209,000 Buku Jurnal Edisi 39 Tahun 2020
44 Agregat Pecah Mesin 20-30 mm bh 209,000 Buku Jurnal Edisi 39 Tahun 2020
45 Batu pecah 3-5 cm m' 165,000 Buku Jurnal Edisi 39 Tahun 2020
46 Batu pecah 2-3 cm m3 159,500 Buku Jurnal Edisi 39 Tahun 2020
47 Batu pecah 1-2 cm m3 220,000 Buku Jurnal Edisi 39 Tahun 2020
48 Batu pecah 0.5-1 cm m3 115,500 Buku Jurnal Edisi 39 Tahun 2020
49 Batu m3 143,000 Buku Jurnal Edisi 39 Tahun 2020
50 Bronjong Dengan Kawat Dilapisi Galvanis bh 594,000 Buku Jurnal Edisi 39 Tahun 2020
51 Batu terapistone kg 2,250 Buku Jurnal Edisi 39 Tahun 2020
52 Batu Templek m2 109,992 Buku Jurnal Edisi 39 Tahun 2020
53 Batu Sikat kg 5,000 Buku Jurnal Edisi 39 Tahun 2020
54 Kanstin 6 x 15 x 39 cm bh 12,000 Buku Jurnal Edisi 39 Tahun 2020
55 Kanstin 9 x 15 x 39 cm bh 15,000 Buku Jurnal Edisi 39 Tahun 2020
56 Batu Cury m2 180,000 Buku Jurnal Edisi 39 Tahun 2020
V CAT
1 Cat tembok ICI Eksterior gln 299,630 Buku Jurnal Edisi 39 Tahun 2020
2 Cat tembok ICI Interior gln 280,780 Buku Jurnal Edisi 39 Tahun 2020
3 Cat tembok Catylac Eksterior gln 207,240 Buku Jurnal Edisi 39 Tahun 2020
4 Cat tembok Catylac Interior gln 193,870 Buku Jurnal Edisi 39 Tahun 2020
5 Cat tembok Vinilex gln 165,750 Buku Jurnal Edisi 39 Tahun 2020
6 Cat tembok Sanlex gln 121,550 Buku Jurnal Edisi 39 Tahun 2020
7 Cat tahan asam gln 130,550 Buku Jurnal Edisi 39 Tahun 2020
8 Cat Marka / Spotlight kg 118,260 Buku Jurnal Edisi 39 Tahun 2020
9 Cat kayu kg 55,250 Buku Jurnal Edisi 39 Tahun 2020
10 Cat besi kg 55,250 Buku Jurnal Edisi 39 Tahun 2020
11 Cat Duco kg 200,550 Buku Jurnal Edisi 39 Tahun 2020
12 Cat Brom kg 85,364 Buku Jurnal Edisi 39 Tahun 2020
13 Cat Digalvanis kg 44,120 Buku Jurnal Edisi 39 Tahun 2020
14 Cat dasar Kayu/Besi ltr 16,700 Buku Jurnal Edisi 39 Tahun 2020
15 Cat tembok Wiratex kg 24,860 Buku Jurnal Edisi 39 Tahun 2020
16 Cat Marka kg 52,260 Buku Jurnal Edisi 39 Tahun 2020
17 Cat primer kg 90,865 Buku Jurnal Edisi 39 Tahun 2020
18 Cat dasar Alkali ltr 96,780 Buku Jurnal Edisi 39 Tahun 2020
19 Cat dasar tembok, Indo 9000 Sealer Water Base kg 26,880 Buku Jurnal Edisi 39 Tahun 2020
20 Waterprofing Emulsion kg 110,240 Buku Jurnal Edisi 39 Tahun 2020
21 Waterprofing Membrance m 86,900 Buku Jurnal Edisi 39 Tahun 2020
22 Glass Bead kg 21,520 Buku Jurnal Edisi 39 Tahun 2020
23 Melamik kg 58,768 Buku Jurnal Edisi 39 Tahun 2020
24 Cat trottoar floor hardener m2 77,350 Buku Jurnal Edisi 39 Tahun 2020
25 Cat trottoar Mowilex m2 66,300 Buku Jurnal Edisi 39 Tahun 2020
26 Cat Besi kg 60,500 Buku Jurnal Edisi 39 Tahun 2020
27 Cat Anti Karat kg 49,500 Buku Jurnal Edisi 39 Tahun 2020
28 Cat Marka Thermoplastic kg 21,772 Buku Jurnal Edisi 39 Tahun 2020
29 Glass Bead kg 30,800 Buku Jurnal Edisi 39 Tahun 2020
30 Cat Marka Non Thermo kg 17,800 Buku Jurnal Edisi 39 Tahun 2020
31 Politur setara Mowilex ltr 375,000 Buku Jurnal Edisi 39 Tahun 2020
32 Thermoplastic kg 21,255 Buku Jurnal Edisi 39 Tahun 2020
33 Coldplastic kg 23,856 Buku Jurnal Edisi 39 Tahun 2020

VI SENG
1 Seng BJLS 30, lebar 60 cm (1 rol = 50 m') m 46,790 Buku Jurnal Edisi 39 Tahun 2020
2 Seng BJLS 30, lebar 90 cm (1 rol = 50 m') m 44,963 Buku Jurnal Edisi 39 Tahun 2020
3 Seng plat BJLS 25 uk. 90 x 180 cm lbr 56,820 Buku Jurnal Edisi 39 Tahun 2020
4 Seng plat BJLS 30 uk. 90 x 180 cm lbr 73,530 Buku Jurnal Edisi 39 Tahun 2020
5 Seng gelombang BJLS 25 uk. 0.90 x 1.80 m lbr 52,537 Buku Jurnal Edisi 39 Tahun 2020
6 Seng gelombang BJLS 30 uk. 0.90 x 1.80 m lbr 58,830 Buku Jurnal Edisi 39 Tahun 2020
7 Atap seng gelombang, uk. 0,80 x 1,80 lbr 102,299 Buku Jurnal Edisi 39 Tahun 2020
8 Atap seng gelombang, uk. 1,05 x 2,40 lbr 74,580 Buku Jurnal Edisi 39 Tahun 2020
9 Nok stel gelombang, 0.92 m lbr 36,760 Buku Jurnal Edisi 39 Tahun 2020
10 Nok stel gelombang, 1.10 m lbr 36,760 Buku Jurnal Edisi 39 Tahun 2020
11 Nok stel rata, 1.10 m lbr 28,730 Buku Jurnal Edisi 39 Tahun 2020
12 Nok stel rata, 0.92 m lbr 44,200 Buku Jurnal Edisi 39 Tahun 2020
13 Nok paten rata, 1.05 m lbr 21,390 Buku Jurnal Edisi 39 Tahun 2020
14 Nok paten gelombang, 0.92 m lbr 13,370 Buku Jurnal Edisi 39 Tahun 2020
15 Nok paten gelombang, 1.05 m lbr 18,040 Buku Jurnal Edisi 39 Tahun 2020
16 Nok paten gelombang, 1.10 m lbr 22,450 Buku Jurnal Edisi 39 Tahun 2020
17 Seng Gelombang BJLS uk. 0.2 x 80 x 180 cm m2 72,211 Buku Jurnal Edisi 39 Tahun 2020

VII BAJA/BESI
1 Rangka baja Jembatan kg 25,030 Buku Jurnal Edisi 39 Tahun 2020
2 Kuda-kuda rangka Baja Ringan (Zinkalun) m2 226,980 Buku Jurnal Edisi 39 Tahun 2020
3 Kuda-kuda rangka Baja Ringan (Galvalum) m2 237,630 Buku Jurnal Edisi 39 Tahun 2020
4 IWF ex Jepang kg 14,545 Buku Jurnal Edisi 39 Tahun 2020
5 IWF ex DN SII kg 18,708 Buku Jurnal Edisi 39 Tahun 2020
6 Besi profil ex DN-SII kg 14,105 Buku Jurnal Edisi 39 Tahun 2020
7 Besi profil ex luar negeri kg 12,447 Buku Jurnal Edisi 39 Tahun 2020
8 Besi "C" Lip Chanel kg 4,529 Buku Jurnal Edisi 39 Tahun 2020
9 Besi Hollow 4 x 4 tebal 0,8 mm btg 149,170 Buku Jurnal Edisi 39 Tahun 2020
10 Besi Hollow 4 x 2 tebal 0,8 mm btg 82,870 Buku Jurnal Edisi 39 Tahun 2020
11 Besi begel Kuda-kuda kg 32,133 Buku Jurnal Edisi 39 Tahun 2020
12 Baja Struktur Bj 34 (Titik Leleh 210 Mpa) bh 2,080,270 Buku Jurnal Edisi 39 Tahun 2020
13 Besi Bjtd 40 kg 1,733,577 Buku Jurnal Edisi 39 Tahun 2020
14 Baja Profil L.40.40.4 m 9,450 Buku Jurnal Edisi 39 Tahun 2020
VIII TIANG BETON/BETON PRACETAK
1 Pipa beton bertulang 60/100 cm m 414,370 Buku Jurnal Edisi 39 Tahun 2020
2 Pipa beton bertulang 80/100 cm m 497,250 Buku Jurnal Edisi 39 Tahun 2020
3 Pipa beton bertulang 100/100 cm m 580,120 Buku Jurnal Edisi 39 Tahun 2020
4 Pipa beton bertulang 120/100 cm m 635,370 Buku Jurnal Edisi 39 Tahun 2020
5 Pipa beton jeking pracetak Uk. 0,80/2,43 M m 6,188,000 Buku Jurnal Edisi 39 Tahun 2020
6 Pipa beton jeking pracetak Uk. 1,10/2,43 M m 6,806,800 Buku Jurnal Edisi 39 Tahun 2020
7 Pipa beton jeking pracetak Uk. 1,35/2,43 M m 7,487,480 Buku Jurnal Edisi 39 Tahun 2020
8 Pipa beton jeking pracetak Uk. 1,50/2,43 M m 8,236,220 Buku Jurnal Edisi 39 Tahun 2020
9 Pipa beton jeking pracetak Uk. 1,80/2,43 M m 9,059,850 Buku Jurnal Edisi 39 Tahun 2020
10 Pipa beton jeking pracetak Uk. 2,00/2,43 M m 9,965,820 Buku Jurnal Edisi 39 Tahun 2020
11 Beton HALF SLAB Type 100.05.8 m2 217,590 Buku Jurnal Edisi 39 Tahun 2020
12 Beton HALF SLAB Type 80.05.5 m2 143,990 Buku Jurnal Edisi 39 Tahun 2020
13 Panel 240.40.5 lbr 80,880 Buku Jurnal Edisi 39 Tahun 2020
14 Beton H-Beam 260 btg 3,188,266 Buku Jurnal Edisi 39 Tahun 2020
15 Beton H-Beam 300 btg 4,869,031 Buku Jurnal Edisi 39 Tahun 2020
16 Beton H-Beam 340 btg 7,074,397 Buku Jurnal Edisi 39 Tahun 2020
17 Beton H-Beam 360 btg 9,373,964 Buku Jurnal Edisi 39 Tahun 2020
18 Beton H-Beam 380 btg 6,668,921 Buku Jurnal Edisi 39 Tahun 2020
19 Beton H-Beam 420 btg 18,961,513 Buku Jurnal Edisi 39 Tahun 2020
20 PONDASI STRAUSZ Dia 40 - 150 ttk 264,520 Buku Jurnal Edisi 39 Tahun 2020
21 PONDASI STRAUSZ Dia 40 - 200 ttk 351,900 Buku Jurnal Edisi 39 Tahun 2020
22 TIANG PANCANG (PILE) SQUARE 25 (D16) m 59,015 Buku Jurnal Edisi 39 Tahun 2020
23 Pracetak Gelagar Tipe I Bentang bh 393,379 Buku Jurnal Edisi 39 Tahun 2020
24 Pracetak Gelagar Tipe I Bentang bh 399,132 Buku Jurnal Edisi 39 Tahun 2020
25 Pracetak Gelagar Tipe I Bentang bh 401,162 Buku Jurnal Edisi 39 Tahun 2020
26 Pracetak Gelagar Tipe I Bentang bh 405,900 Buku Jurnal Edisi 39 Tahun 2020
27 Pracetak Gelagar Tipe I Bentang bh 413,684 Buku Jurnal Edisi 39 Tahun 2020
28 Pracetak K 350 m3 155,526 Buku Jurnal Edisi 39 Tahun 2020
29 Pracetak Voided Bentang 7 M bh 176,960 Buku Jurnal Edisi 39 Tahun 2020

IX BESI BETON
1 Baja Tulangan U-32, ulir kg 13,090 Buku Jurnal Edisi 39 Tahun 2020
2 Baja Tulangan U-39, ulir kg 13,090 Buku Jurnal Edisi 39 Tahun 2020
3 Baja Tulangan U-42, ulir kg 13,090 Buku Jurnal Edisi 39 Tahun 2020
4 Baja Tulangan U-24, polos kg 11,856 Buku Jurnal Edisi 39 Tahun 2020
5 Baja Tulangan U-32, polos kg 12,105 Buku Jurnal Edisi 39 Tahun 2020
6 Wiremash 8 mm m2 57,460 Buku Jurnal Edisi 39 Tahun 2020
7 Wiremash 6 mm m2 54,926 Buku Jurnal Edisi 39 Tahun 2020
8 Baja Tulangan kg 8,856 Buku Jurnal Edisi 39 Tahun 2020
9 Baja Tulangan (Ulir) D32 kg 8,856 Buku Jurnal Edisi 39 Tahun 2020
10 Baja Tulangan U39 kg 8,856 Buku Jurnal Edisi 39 Tahun 2020
11 Wiremesh kg 62,094 Buku Jurnal Edisi 39 Tahun 2020
12 Kawat Beton kg 31,625 Buku Jurnal Edisi 39 Tahun 2020
13 Kawat Beton kg 23,115 Buku Jurnal Edisi 39 Tahun 2020
14 Besi Beton Specs: dia 10 mm btg 71,000 Buku Jurnal Edisi 39 Tahun 2020
15 Besi Beton Specs: dia 12 mm btg 97,000 Buku Jurnal Edisi 39 Tahun 2020
16 Besi Beton Specs: dia 16 mm btg 167,314 Buku Jurnal Edisi 39 Tahun 2020
17 Besi Beton Specs: Kanal "U" 150mm x 75mm x 6,5mm x 6m btg 550,000 Buku Jurnal Edisi 39 Tahun 2020
18 Besi UNP 200 Specs: Kanal "U" 150mm x 75mm x 6,5mm x 6m btg 650,000 Buku Jurnal Edisi 39 Tahun 2020
X TEGEL
1 Tegel Pearlstone/Beton sikat 40 x 40 x 3 cm warna bh 26,500 Buku Jurnal Edisi 39 Tahun 2020
2 Teraso Cor m3 1,381,250 Buku Jurnal Edisi 39 Tahun 2020
3 Tegal Classic Stone 30 x 30 x 3 cm (Natural) bh 8,160 Buku Jurnal Edisi 39 Tahun 2020
4 Tegal Classic Stone 30 x 30 x 3 cm (Warna) bh 9,100 Buku Jurnal Edisi 39 Tahun 2020
5 Tegal Classic Keramik 30 x 30 x 0,06 cm m2 80,550 Buku Jurnal Edisi 39 Tahun 2020
6 Tegal Classic Keramik 30 x 30 x 0,05 cm m2 63,530 Buku Jurnal Edisi 39 Tahun 2020
7 Porcelein 11 x 11 warna standar DN m2 52,631 Buku Jurnal Edisi 39 Tahun 2020
8 Porcelein 11 x 11 warna khusus DN m2 58,595 Buku Jurnal Edisi 39 Tahun 2020
9 Keramik 10/10, 10/20, 20/20, KW I putih/polos m2 57,340 Buku Jurnal Edisi 39 Tahun 2020
10 Keramik 10/10, 10/20, 20/20, KW I warna m2 63,200 Buku Jurnal Edisi 39 Tahun 2020
11 Plint Keramik 5/20, corak warna, anti slip bh 1,380 Buku Jurnal Edisi 39 Tahun 2020
12 Plint Keramik 10/20 warna bh 1,650 Buku Jurnal Edisi 39 Tahun 2020
13 Plint Keramik cove artistik (5 x 5 x20) bh 69,852 Buku Jurnal Edisi 39 Tahun 2020
14 Keramik dinding 10/20, corak warna, anti slip m2 63,200 Buku Jurnal Edisi 39 Tahun 2020
15 Keramik dinding 15/15, putih polos m2 42,158 Buku Jurnal Edisi 39 Tahun 2020
16 Keramik dinding 15/15, corak warna, anti slip m2 44,603 Buku Jurnal Edisi 39 Tahun 2020
17 Keramik dinding 20/20, corak warna, anti slip m2 63,809 Buku Jurnal Edisi 39 Tahun 2020
18 Keramik 20/20, KW I putih/polos m2 57,340 Buku Jurnal Edisi 39 Tahun 2020
19 Keramik dinding 20/25, putih/polos m2 58,950 Buku Jurnal Edisi 39 Tahun 2020
20 Keramik dinding 20/25, corak warna m2 63,260 Buku Jurnal Edisi 39 Tahun 2020
21 Keramik lantai 30 x 30, DN putih polos m2 60,270 Buku Jurnal Edisi 39 Tahun 2020
22 Keramik lantai 30 x 30, DN warna/corak, anti slip m2 63,200 Buku Jurnal Edisi 39 Tahun 2020
23 Keramik lantai 40 x 40, DN warna/corak m2 79,000 Buku Jurnal Edisi 39 Tahun 2020
24 Keramik Mozaik lantai 30 x 30 DN warna/corak, anti slip m2 67,620 Buku Jurnal Edisi 39 Tahun 2020
25 Stairmosing keramik 10/20 m 15,662 Buku Jurnal Edisi 39 Tahun 2020
26 Stairmosing keramik Fiber m 22,126 Buku Jurnal Edisi 39 Tahun 2020
27 Granit alam LN ukuran besar m2 2,080,270 Buku Jurnal Edisi 39 Tahun 2020
28 Granit alam LN ukuran kecil m2 1,733,577 Buku Jurnal Edisi 39 Tahun 2020
29 Granit alam DN ukuran besar m2 1,669,120 Buku Jurnal Edisi 39 Tahun 2020
30 Granit alam DN ukuran kecil m2 1,548,420 Buku Jurnal Edisi 39 Tahun 2020
31 Lantai Vinil karet, 30 x 30 lbr 5,130 Buku Jurnal Edisi 39 Tahun 2020
32 Lantai Vinil motif kembang, 30 x 30 lbr 6,630 Buku Jurnal Edisi 39 Tahun 2020
33 Granito tile essenza 40 x 40 polis m2 267,410 Buku Jurnal Edisi 39 Tahun 2020
34 Granito tile essenza 40 x 40 unpolis m2 193,870 Buku Jurnal Edisi 39 Tahun 2020
35 Granito tile essenza 60 x 60 polis m2 345,420 Buku Jurnal Edisi 39 Tahun 2020
36 Granito tile essenza 60 x 60 unpolis m2 248,497 Buku Jurnal Edisi 39 Tahun 2020
37 Lantai Marmer Citatah uk. 15/30 m2 199,020 Buku Jurnal Edisi 39 Tahun 2020
38 Lantai Marmer Citatah uk. 20/30 m2 228,135 Buku Jurnal Edisi 39 Tahun 2020
39 Lantai Marmer Citatah uk. 30/30 m2 236,023 Buku Jurnal Edisi 39 Tahun 2020
40 Lantai Marmer Citatah uk. 40/40 m2 162,510 Buku Jurnal Edisi 39 Tahun 2020
41 Roman Keramik Metropolitan uk. 60/60 m2 250,000 Buku Jurnal Edisi 39 Tahun 2020
42 Lantai Marmer Citatah uk. 100/100 m2 280,755 Buku Jurnal Edisi 39 Tahun 2020
43 Marmer (Papan Nama Jembatan) m2 550,000 Buku Jurnal Edisi 39 Tahun 2020
44 Tegel/Ubin Difabel Kuning Strip 30x30x3 Specs: bh 18,000 Buku Jurnal Edisi 39 Tahun 2020
45 Tegel/Ubin Specs: Difabel Kuning Bintik 30x30x3 bh 18,000 Buku Jurnal Edisi 39 Tahun 2020
XI GENTENG, NOK DAN TALANG
1 Atap Genteng metal (Zinkalum) Polos tebal 0,5 mm lbr 132,600 Buku Jurnal Edisi 39 Tahun 2020
2 Atap Genteng metal (Galvalum) Polos tebal 0,5 mm lbr 154,700 Buku Jurnal Edisi 39 Tahun 2020
3 Atap Genteng metal (Zinkalum) Tekstur tebal 0,5 mm lbr 193,370 Buku Jurnal Edisi 39 Tahun 2020
4 Atap Genteng metal (Galvalum) Tekstur tebal 0,5 mm lbr 209,950 Buku Jurnal Edisi 39 Tahun 2020
5 Atap Genteng palentong pres bakar KW. I, ex Jatiwangi bh 1,760 Buku Jurnal Edisi 39 Tahun 2020
6 Atap Genteng palentong pres Molen Oven KW. I, ex Jatiwangi bh 2,210 Buku Jurnal Edisi 39 Tahun 2020
7 Atap Genteng Vlaams pres Molen Oven KW. I, ex Jatiwangi bh 1,779 Buku Jurnal Edisi 39 Tahun 2020
8 Atap Genteng keramik warna Stand. KIA bh 7,180 Buku Jurnal Edisi 39 Tahun 2020
9 Atap Genteng keramik warna Khusus. KIA bh 11,790 Buku Jurnal Edisi 39 Tahun 2020
10 Atap Genteng bubung Pres bulat bh 6,082 Buku Jurnal Edisi 39 Tahun 2020
11 Atap Genteng bubung Pres segi tiga bh 6,134 Buku Jurnal Edisi 39 Tahun 2020
12 Atap Genteng kodok natural, ex jatiwangi bh 2,760 Buku Jurnal Edisi 39 Tahun 2020
13 Atap Genteng kodok glazuur, ex jatiwangi bh 3,590 Buku Jurnal Edisi 39 Tahun 2020
14 Atap Genteng palentong super/besar natural, ex Jatiwangi bh 3,860 Buku Jurnal Edisi 39 Tahun 2020
15 Atap Genteng palentong super/besar glazuur, ex Jatiwangi bh 2,430 Buku Jurnal Edisi 39 Tahun 2020
16 Atap Genteng beton natural, Rengganis bh 4,970 Buku Jurnal Edisi 39 Tahun 2020
17 Atap Genteng beton warna 14,4/m2 m2 183,847 Buku Jurnal Edisi 39 Tahun 2020
18 Atap Genteng beton Natural 14,4/m2 m2 110,730 Buku Jurnal Edisi 39 Tahun 2020
19 Atap Genteng Morando natural ex Jatiwangi bh 7,180 Buku Jurnal Edisi 39 Tahun 2020
20 Atap Genteng Morando glazuur ex Jatiwangi bh 9,110 Buku Jurnal Edisi 39 Tahun 2020
21 Bubung genteng keramik warna Stand. KIA bh 16,090 Buku Jurnal Edisi 39 Tahun 2020
22 Bubung genteng keramik warna Khusus. KIA bh 28,890 Buku Jurnal Edisi 39 Tahun 2020
23 Bubung genteng metal Rainbow bh 169,513 Buku Jurnal Edisi 39 Tahun 2020
24 Bubung genteng metal Sakura bh 166,931 Buku Jurnal Edisi 39 Tahun 2020
25 Genteng bubung segi tiga/bulat, natural bh 1,930 Buku Jurnal Edisi 39 Tahun 2020
26 Genteng bubung segi tiga/bulat, glazuur bh 2,430 Buku Jurnal Edisi 39 Tahun 2020
27 Genteng bubung beton natural Rengganis bh 4,640 Buku Jurnal Edisi 39 Tahun 2020
28 Genteng bubung beton warna Rengganis bh 5,800 Buku Jurnal Edisi 39 Tahun 2020
29 Genteng bubung natural Morando bh 7,185 Buku Jurnal Edisi 39 Tahun 2020
30 Genteng bubung glazuur Morando bh 9,884 Buku Jurnal Edisi 39 Tahun 2020
31 Genteng bubung palentong besar natural bh 3,030 Buku Jurnal Edisi 39 Tahun 2020
32 Genteng bubung palentong besar glazuur bh 5,520 Buku Jurnal Edisi 39 Tahun 2020
33 Atap plastik gelombang, uk. 0,80 x 1,80 lbr 38,600 Buku Jurnal Edisi 39 Tahun 2020
34 Atap aluminium, ULR - 7 (I= 920mm x 0.50 mm) m2 138,010 Buku Jurnal Edisi 39 Tahun 2020
35 Nok atap aluminium std. m2 78,520 Buku Jurnal Edisi 39 Tahun 2020
36 Atap sirap kelas I (1 m2 = 80 lb) lbr 2,760 Buku Jurnal Edisi 39 Tahun 2020
37 Nok Allumunium Std m 45,000 Buku Jurnal Edisi 39 Tahun 2020

XII BUIS BETON, U-DITCH, DAN BOX CULVERT


1 Gorong-gorong Beton tanpatulang dia. Dalam 20-30 cm m 106,080 Buku Jurnal Edisi 39 Tahun 2020
2 Gorong-gorong Beton bertulang dia. Dalam 45 cm m 294,700 Buku Jurnal Edisi 39 Tahun 2020
3 Gorong-gorong Beton bertulang dia. Dalam 45-75 cm m 412,600 Buku Jurnal Edisi 39 Tahun 2020
4 Gorong-gorong Beton bertulang dia. Dalam 75-95 cm m 648,410 Buku Jurnal Edisi 39 Tahun 2020
5 Gorong-gorong Beton bertulang dia. Dalam 95-120 cm m 1,061,130 Buku Jurnal Edisi 39 Tahun 2020
6 Gorong-gorong Beton bertulang dia. Dalam 120-150 cm m 1,768,000 Buku Jurnal Edisi 39 Tahun 2020
7 Saluran air beton (U-DITCH) 20 x 50 tebal 4 cm bh 64,530 Buku Jurnal Edisi 39 Tahun 2020
8 Saluran air beton (U-DITCH) 30 x 50 tebal 5 cm bh 88,840 Buku Jurnal Edisi 39 Tahun 2020
9 Saluran air beton (U-DITCH) 40 x 50 tebal 6 cm bh 119,220 Buku Jurnal Edisi 39 Tahun 2020
10 Saluran air beton (U-DITCH) 50 x 50 tebal 7 cm bh 161,770 Buku Jurnal Edisi 39 Tahun 2020
11 Buis beton dia 20 cm - 1,00 m bh 66,180 Buku Jurnal Edisi 39 Tahun 2020
12 Buis beton dia 30 cm - 1,00 m lbr 94,120 Buku Jurnal Edisi 39 Tahun 2020
13 Buis beton dia 40 cm - 1,00 m bh 88,716 Buku Jurnal Edisi 39 Tahun 2020
14 Buis beton dia 50 cm - 0,50 m m2 278,413 Buku Jurnal Edisi 39 Tahun 2020
15 Buis beton dia 80 cm - 0,50 m lbr 326,414 Buku Jurnal Edisi 39 Tahun 2020
16 Buis beton dia 60 cm - 0,50 m lbr 374,186 Buku Jurnal Edisi 39 Tahun 2020
17 Buis beton dia 100 cm - 0,50 m bh 239,650 Buku Jurnal Edisi 39 Tahun 2020
18 Buis beton dia 10 cm - 0,50 m stk 10,854 Buku Jurnal Edisi 39 Tahun 2020
19 Buis beton dia 15 cm - 0,50 m stk 15,795 Buku Jurnal Edisi 39 Tahun 2020
20 Buis beton dia 20 cm - 0,50 m stk 17,842 Buku Jurnal Edisi 39 Tahun 2020
21 Buis beton dia 25 cm - 0,50 m stk 24,589 Buku Jurnal Edisi 39 Tahun 2020
22 Pasangan Gorong-gorong Pracetak (Box Culvert) uk. 0,80/1,20 M' m 2,834,895 Buku Jurnal Edisi 39 Tahun 2020
23 Pasangan Gorong-gorong Pracetak (Box Culvert) uk. 1,00/1,20 M' m 4,018,428 Buku Jurnal Edisi 39 Tahun 2020
24 Pasangan Gorong-gorong Pracetak (Box Culvert) uk. 1,20/1,20 M' m 5,521,243 Buku Jurnal Edisi 39 Tahun 2020
25 Pasangan Gorong-gorong Pracetak (Box Culvert) uk. 1,50/1,20 M' m 9,019,895 Buku Jurnal Edisi 39 Tahun 2020
26 Pasangan Gorong-gorong Pracetak (Box Culvert) uk. 2,00/1,20 M' lbr 11,736,923 Buku Jurnal Edisi 39 Tahun 2020
XIII PLAT BESI/BAJA
1 Plat Bondex m2 129,690 Buku Jurnal Edisi 39 Tahun 2020
2 Besi Strip, uk. 3 x 30 mm x 6 m (4,21 kg) btg 33,560 Buku Jurnal Edisi 39 Tahun 2020
3 Plat besi tipis 1 mm kg 17,010 Buku Jurnal Edisi 39 Tahun 2020
4 Plat besi tipis 0,5 mm kg 20,363 Buku Jurnal Edisi 39 Tahun 2020
5 Plat besi tipis 2 mm - 5 mm lbr 23,120 Buku Jurnal Edisi 39 Tahun 2020
6 Plat besi tipis 5 mm - 10 mm kg 15,900 Buku Jurnal Edisi 39 Tahun 2020
7 Plat besi tipis 10 mm ke atas kg 15,561 Buku Jurnal Edisi 39 Tahun 2020
8 Steel Grating (Dengan Rangka Angkur) bh 3,188,266 Buku Jurnal Edisi 39 Tahun 2020
9 Plat Baja kg 10,670 Buku Jurnal Edisi 39 Tahun 2020
10 Pipa Baja kg 7,074,397 Buku Jurnal Edisi 39 Tahun 2020
11 Stainless Plate m1 9,373,964 Buku Jurnal Edisi 39 Tahun 2020

XIV KAWAT
1 Kawat Beton kg 20,520 Buku Jurnal Edisi 39 Tahun 2020
2 Kawat duri (1 rol = 80 m' = 10 kg) m 5,520 Buku Jurnal Edisi 39 Tahun 2020
3 Kawat Pengikat m 2,760 Buku Jurnal Edisi 39 Tahun 2020
4 Kawat Bronjong 4 mm kg 12,490 Buku Jurnal Edisi 39 Tahun 2020
5 Kawat Bronjong 3 mm kg 13,300 Buku Jurnal Edisi 39 Tahun 2020
6 Kawat Tembaga kg 46,310 Buku Jurnal Edisi 39 Tahun 2020
7 Kawat las listrik kg 66,300 Buku Jurnal Edisi 39 Tahun 2020
8 Kawat raam m2 21,571 Buku Jurnal Edisi 39 Tahun 2020
9 Kawat nyamuk hijau m2 18,085 Buku Jurnal Edisi 39 Tahun 2020
10 Kawat kassa/Harmonika, uk. 2.0 x 2.0 dia 2 mm m2 34,084 Buku Jurnal Edisi 39 Tahun 2020
11 Kawat kassa/Harmonika, uk. 3.0 x 3.0 dia 2 mm m2 32,053 Buku Jurnal Edisi 39 Tahun 2020
12 Kawat kassa/Harmonika, uk. 4.0 x 4.0 dia 2 mm m2 32,053 Buku Jurnal Edisi 39 Tahun 2020
13 Kawat seng galvanis, uk. 3 mm kg 19,330 Buku Jurnal Edisi 39 Tahun 2020
14 Kawat seng galvanis, uk. 4 mm kg 22,100 Buku Jurnal Edisi 39 Tahun 2020
15 Kawat seng galvanis, uk. 5 mm kg 22,100 Buku Jurnal Edisi 39 Tahun 2020
16 Kawat Asbes bh 85,800 Buku Jurnal Edisi 39 Tahun 2020
17 Kawat Las kg 31,625 Buku Jurnal Edisi 39 Tahun 2020

XV MINYAK CAT/THINNER
1 Soligem (1 blek = 10 liter) ltr 7,450 Buku Jurnal Edisi 39 Tahun 2020
2 Plint coat kg 39,283 Buku Jurnal Edisi 39 Tahun 2020
3 Dempul halus/Impra (Wood Filler) kg 46,790 Buku Jurnal Edisi 39 Tahun 2020
4 Terpentin ltr 11,760 Buku Jurnal Edisi 39 Tahun 2020
5 Thiner A ltr 21,720 Buku Jurnal Edisi 39 Tahun 2020
6 Thiner B ltr 36,760 Buku Jurnal Edisi 39 Tahun 2020
7 Kompon kg 32,053 Buku Jurnal Edisi 39 Tahun 2020
8 Plamir tembok kg 16,570 Buku Jurnal Edisi 39 Tahun 2020
9 Dempul kayu kg 23,840 Buku Jurnal Edisi 39 Tahun 2020
10 Meni besi/kayu kg 22,370 Buku Jurnal Edisi 39 Tahun 2020
11 Zinchromate m2 35,425 Buku Jurnal Edisi 39 Tahun 2020
12 Sirlak ex India kg 160,220 Buku Jurnal Edisi 39 Tahun 2020
13 Spirtus ltr 10,475 Buku Jurnal Edisi 39 Tahun 2020
14 Oker putih kg 21,270 Buku Jurnal Edisi 39 Tahun 2020
15 Oker warna kg 27,340 Buku Jurnal Edisi 39 Tahun 2020
16 Dempul Plitur kg 39,792 Buku Jurnal Edisi 39 Tahun 2020
17 Dempul lilin kg 8,680 Buku Jurnal Edisi 39 Tahun 2020
18 Dempul plastik kg 34,560 Buku Jurnal Edisi 39 Tahun 2020
19 Oten (pewarna plituran) bks 7,857 Buku Jurnal Edisi 39 Tahun 2020
20 Plitur jadi DX ltr 28,807 Buku Jurnal Edisi 39 Tahun 2020
21 Plitur jadi Ultran ltr 57,730 Buku Jurnal Edisi 39 Tahun 2020
22 Minyak Pelebur Cat (Soda Api) klg 42,540 Buku Jurnal Edisi 39 Tahun 2020
23 Thinner ltr 22,000 Buku Jurnal Edisi 39 Tahun 2020
XVI CONBLOCK, PAVING, KANSTEEN, DAN ACCESSORIES
1 Beton conblock (CB.10) bh 8,066 Buku Jurnal Edisi 39 Tahun 2020
2 Beton conblock (CB.15) bh 8,799 Buku Jurnal Edisi 39 Tahun 2020
3 Beton conblock (CB.20) bh 9,323 Buku Jurnal Edisi 39 Tahun 2020
4 Batacote kg 95,640 Buku Jurnal Edisi 39 Tahun 2020
5 Paving block Natural 8 cm m2 71,070 Buku Jurnal Edisi 39 Tahun 2020
6 Paving block Warna 8 cm m2 131,900 Buku Jurnal Edisi 39 Tahun 2020
7 Paving block Natural 6 cm m2 111,580 Buku Jurnal Edisi 39 Tahun 2020
8 Paving block Warna 6 cm m2 68,181 Buku Jurnal Edisi 39 Tahun 2020
9 Kansteen Pavingblock bh 29,610 Buku Jurnal Edisi 39 Tahun 2020
10 Batu pinggir beton uk. 6 x 15 x 40 cm (Kansteen) bh 44,501 Buku Jurnal Edisi 39 Tahun 2020
11 Batu pinggir beton uk. 10 x 20 x 35 cm (Kansteen) bh 21,191 Buku Jurnal Edisi 39 Tahun 2020
12 Grass block 45 x 30 x 8 cm bh 20,877 Buku Jurnal Edisi 39 Tahun 2020
13 Grass block 45 x 30 x 10 cm bh 13,970 Buku Jurnal Edisi 39 Tahun 2020
14 Con Block uk. 8 x 20 x 40 bh 3,250 Buku Jurnal Edisi 39 Tahun 2020
15 Batu pinggir beton uk. 15 x 35 x 60 cm (K-225) bh 42,780 Buku Jurnal Edisi 39 Tahun 2020
16 Kansteen Pavingblock 6.15.39 bh 23,949 Buku Jurnal Edisi 39 Tahun 2020
17 Kerb Type A 16.18.28.60 bh 33,260 Buku Jurnal Edisi 39 Tahun 2020
18 Kerb Type B 16.18.40.60 bh 58,344 Buku Jurnal Edisi 39 Tahun 2020
19 Kerb Type C (Jalan masuk) 16.18.15.60 bh 24,310 Buku Jurnal Edisi 39 Tahun 2020
20 Kerb Type D (Tali air) 16.18.30.60 bh 53,843 Buku Jurnal Edisi 39 Tahun 2020
21 Kerb Type L 16.18.30.60 bh 58,243 Buku Jurnal Edisi 39 Tahun 2020
22 Kerb Type E 20.25.30.60 bh 51,050 Buku Jurnal Edisi 39 Tahun 2020
23 Gravel beton 1/2 U 20 cm bh 52,731 Buku Jurnal Edisi 39 Tahun 2020
24 Gravel beton 1/2 U 30 cm bh 66,698 Buku Jurnal Edisi 39 Tahun 2020
25 Gravel beton 1/2 U 40 cm bh 91,141 Buku Jurnal Edisi 39 Tahun 2020
26 Paving Blok (Natural) m2 55,236 Buku Jurnal Edisi 39 Tahun 2020
27 Kerb Jenis 1 m1 104,280 Buku Jurnal Edisi 39 Tahun 2020

XVII ASBES
1 Atap asbes gelombang, uk. 1.05 x 1.80 x 4 mm lbr 57,272 Buku Jurnal Edisi 39 Tahun 2020
2 Atap asbes gelombang, uk. 1.05 x 2.10 x 5 mm lbr 90,061 Buku Jurnal Edisi 39 Tahun 2020
3 Atap asbes gelombang, uk. 1.05 x 2.40 x 4 mm lbr 60,160 Buku Jurnal Edisi 39 Tahun 2020
4 Atap asbes gelombang, uk. 1.05 x 2.70 x 4 mm lbr 111,773 Buku Jurnal Edisi 39 Tahun 2020
5 Atap asbes gelombang, uk. 1.05 x 3.00 x 4 mm lbr 125,464 Buku Jurnal Edisi 39 Tahun 2020
6 Atap asbes gelombang, uk. 1.10 x 1.80 x 5 mm lbr 30,020 Buku Jurnal Edisi 39 Tahun 2020
7 Atap asbes gelombang, uk. 1.10 x 2.00 x 5 mm lbr 72,882 Buku Jurnal Edisi 39 Tahun 2020
8 Atap asbes gelombang, uk. 1.10 x 2.25 x 5 mm lbr 64,305 Buku Jurnal Edisi 39 Tahun 2020
9 Atap asbes gelombang, uk. 1.10 x 2.50 x 5 mm lbr 68,181 Buku Jurnal Edisi 39 Tahun 2020
10 Atap asbes gelombang, uk. 1.10 x 3.00 x 5 mm lbr 56,150 Buku Jurnal Edisi 39 Tahun 2020
11 Atap asbes gelombang, uk. 1.10 x 1.80 x 6 mm lbr 44,501 Buku Jurnal Edisi 39 Tahun 2020
12 Atap asbes gelombang, uk. 1.10 x 2.00 x 6 mm lbr 38,100 Buku Jurnal Edisi 39 Tahun 2020
13 Atap asbes gelombang, uk. 1.10 x 2.25 x 6 mm lbr 41,760 Buku Jurnal Edisi 39 Tahun 2020
14 Atap asbes gelombang, uk. 1.10 x 2.50 x 6 mm lbr 71,070 Buku Jurnal Edisi 39 Tahun 2020
15 Atap asbes gelombang, uk. 1.10 x 3.00 x 6 mm lbr 79,415 Buku Jurnal Edisi 39 Tahun 2020
16 Atap genteng asbes, uk. 0.85 x 1.15 lbr 27,620 Buku Jurnal Edisi 39 Tahun 2020
17 Nok genteng asbes, pj. 1.15 m bh 19,017 Buku Jurnal Edisi 39 Tahun 2020
18 Eternit asbes semen, 1.00 x 1.00 x 3,5 mm lbr 23,239 Buku Jurnal Edisi 39 Tahun 2020
19 Eternit asbes semen, 1.00 x 1.00 x 4,0 mm lbr 12,678 Buku Jurnal Edisi 39 Tahun 2020
20 Eternit asbes semen, 1.00 x 1.00 x 5,0 mm lbr 21,191 Buku Jurnal Edisi 39 Tahun 2020
21 Eternit asbes semen, 1.00 x 1.00 x 6,0 mm lbr 24,860 Buku Jurnal Edisi 39 Tahun 2020

XVIII PAKU
1 Paku 1 s/d 2 1/2 cm kg 25,039 Buku Jurnal Edisi 39 Tahun 2020
2 Paku 4 s/d 7 cm kg 19,010 Buku Jurnal Edisi 39 Tahun 2020
3 Paku uk. 8 s/d 12 cm kg 19,010 Buku Jurnal Edisi 39 Tahun 2020
4 Paku beton 2 s/d 5 cm cm 440 Buku Jurnal Edisi 39 Tahun 2020
5 Paku beton 7 cm bh 710 Buku Jurnal Edisi 39 Tahun 2020
6 Paku beton 10 cm bh 880 Buku Jurnal Edisi 39 Tahun 2020
7 Paku Ramset/dinabolt bh 10,901 Buku Jurnal Edisi 39 Tahun 2020
8 Paku anti karat u/ genteng metal (35.00 m2/kg) kg 52,377 Buku Jurnal Edisi 39 Tahun 2020
9 Paku seng kg 34,045 Buku Jurnal Edisi 39 Tahun 2020
10 Paku kaca kg 36,664 Buku Jurnal Edisi 39 Tahun 2020
11 Paku eternit kg 34,045 Buku Jurnal Edisi 39 Tahun 2020
12 Paku triplex kg 21,270 Buku Jurnal Edisi 39 Tahun 2020
13 Paku kait lengkap bh 1,489 Buku Jurnal Edisi 39 Tahun 2020
14 Paku cacing kg 44,759 Buku Jurnal Edisi 39 Tahun 2020
15 Paku gipsum anti karat (20.00 m2/kg) kg 25,130 Buku Jurnal Edisi 39 Tahun 2020
16 Paku Skrup dus 18,242 Buku Jurnal Edisi 39 Tahun 2020
17 Paku pancing bh 706 Buku Jurnal Edisi 39 Tahun 2020
18 Paku kg 16,500 Buku Jurnal Edisi 39 Tahun 2020
XIX LEM
1 Lem kayu u/ HDM (1 tube/10.00 m2) m2 79,000 Buku Jurnal Edisi 39 Tahun 2020
2 Sealent Alumunium ke Kaca tube 27,620 Buku Jurnal Edisi 39 Tahun 2020
3 Sealent Alumunium ke dinding tube 27,620 Buku Jurnal Edisi 39 Tahun 2020
4 Lem kuning (Aibon) kg 55,440 Buku Jurnal Edisi 39 Tahun 2020
5 Lem putih fox kg 36,245 Buku Jurnal Edisi 39 Tahun 2020
6 Lem bh 17,494 Buku Jurnal Edisi 39 Tahun 2020
7 Perekat Lemkra kg 58,243 Buku Jurnal Edisi 39 Tahun 2020
8 Perekat Sambungan Warna kg 72,804 Buku Jurnal Edisi 39 Tahun 2020
9 Lem pcs 5,590 Buku Jurnal Edisi 39 Tahun 2020
10 Lem pcs 9,783 Buku Jurnal Edisi 39 Tahun 2020
11 Lem pcs 18,168 Buku Jurnal Edisi 39 Tahun 2020
12 Lem pcs 11,550 Buku Jurnal Edisi 39 Tahun 2020
13 Lem pcs 23,100 Buku Jurnal Edisi 39 Tahun 2020
14 Lem pcs 34,650 Buku Jurnal Edisi 39 Tahun 2020
15 Lem pcs 13,976 Buku Jurnal Edisi 39 Tahun 2020
16 Lem pcs 90,841 Buku Jurnal Edisi 39 Tahun 2020
17 Lem pcs 97,829 Buku Jurnal Edisi 39 Tahun 2020
18 Lem pcs 8,385 Buku Jurnal Edisi 39 Tahun 2020
19 Lem pcs 13,976 Buku Jurnal Edisi 39 Tahun 2020
20 Lem pcs 8,385 Buku Jurnal Edisi 39 Tahun 2020
21 Lem pcs 11,550 Buku Jurnal Edisi 39 Tahun 2020
22 Lem plastik 12,758 Buku Jurnal Edisi 39 Tahun 2020
23 Lem botol 23,100 Buku Jurnal Edisi 39 Tahun 2020
24 Lem botol 34,749 Buku Jurnal Edisi 39 Tahun 2020
25 Lem Power Glue pcs 4,193 Buku Jurnal Edisi 39 Tahun 2020
26 Lem Power Glue pcs 6,289 Buku Jurnal Edisi 39 Tahun 2020
27 Lem botol 2,310 Buku Jurnal Edisi 39 Tahun 2020
28 Lem botol 7,500 Buku Jurnal Edisi 39 Tahun 2020
29 Lem kayu u/ HDM (1 tube/10.00 m2) tube 79,000 Buku Jurnal Edisi 39 Tahun 2020
30 Lem kuning (Aibon) kg 50,974 Buku Jurnal Edisi 39 Tahun 2020
31 Lem putih kg 31,778 Buku Jurnal Edisi 39 Tahun 2020
32 Lem Vinil kg 73,014 Buku Jurnal Edisi 39 Tahun 2020
33 Lem bh 54,450 Buku Jurnal Edisi 39 Tahun 2020
34 Lem Beton kg 85,393 Buku Jurnal Edisi 39 Tahun 2020

XX AMPELAS
1 AMPLAS lbr 4,000 Buku Jurnal Edisi 39 Tahun 2020

XXI MUR BAUT, SEKRUP, RING, ANGKUR, DAN DYNABOLT


1 Duk Angker kg 21,220 Buku Jurnal Edisi 39 Tahun 2020
2 Mur Baut HTB dia. 10 mm s/d 16 mm (5 cm) bh 18,230 Buku Jurnal Edisi 39 Tahun 2020
3 Mur Baut biasa dia. 10 mm s/d 16 mm (5 cm) bh 11,540 Buku Jurnal Edisi 39 Tahun 2020
4 Skrew Buah 18.313,74 Bolt M 16 x 2 - A325 bh 54,450 Buku Jurnal Edisi 39 Tahun 2020
5 Dynabolt Atau Raamset 8 mm Panjang 4-5 cm bh 11,087 Buku Jurnal Edisi 39 Tahun 2020
6 Baut 12 mm Panjang 2 cm bh 15,900 Buku Jurnal Edisi 39 Tahun 2020
7 Baut 2 dus 15,561 Buku Jurnal Edisi 39 Tahun 2020
8 Angkur Diameter 22 mm P = 800 mm set 132,000 Buku Jurnal Edisi 39 Tahun 2020

XXII KUSEN, PINTU DAN PAGAR


1 Pagar BRC lengkap Tiang (Tanpa Pondasi) m2 230,940 Buku Jurnal Edisi 39 Tahun 2020
2 Panel Sunscreen Aluminium Colourbond m2 71,514 Buku Jurnal Edisi 39 Tahun 2020
3 Pintu Aluminium + kunci berikut kusen unit 486,200 Buku Jurnal Edisi 39 Tahun 2020
4 Folding gate m2 248,620 Buku Jurnal Edisi 39 Tahun 2020
5 Rolling door biasa, Type one sheet unit 3,038,750 Buku Jurnal Edisi 39 Tahun 2020
6 Railing tangga besi stainless m 911,620 Buku Jurnal Edisi 39 Tahun 2020
7 Guard Rill m 383,210 Buku Jurnal Edisi 39 Tahun 2020
8 Rel Handerson lengkap bh 273,480 Buku Jurnal Edisi 39 Tahun 2020
9 Rel Marathon 1 Pintu bh 224,860 Buku Jurnal Edisi 39 Tahun 2020
10 Besi Pagar BRC m1 58,243 Buku Jurnal Edisi 39 Tahun 2020
11 Pagar Dinding Pohon + Batu Tanam ls 72,804 Buku Jurnal Edisi 39 Tahun 2020
12 Pagar Kayu Setara Jati (6 x 3) m1 53,844 Buku Jurnal Edisi 39 Tahun 2020
13 Tiang Pagar Kayu (8 x 8), T = 100 cm batang 58,243 Buku Jurnal Edisi 39 Tahun 2020
XXIII GYPSUM BOARD DAN KALSIBOARD
1 Eternit 4 mm 100 x 100 cm m2 17,556 Buku Jurnal Edisi 39 Tahun 2020
2 Hardflex 5 mm, uk. 120 x 240 cm lbr 63,881 Buku Jurnal Edisi 39 Tahun 2020
3 Gipsum 120 x 240 cm ex DN lbr 76,847 Buku Jurnal Edisi 39 Tahun 2020
4 Gipsum 120 x 240 cm ex LN lbr 106,350 Buku Jurnal Edisi 39 Tahun 2020
5GRC lbr 92,980 Buku Jurnal Edisi 39 Tahun 2020
6 List Gipsump C-7 Profil m 13,370 Buku Jurnal Edisi 39 Tahun 2020
7 List Gipsump 10 cm m 15,985 Buku Jurnal Edisi 39 Tahun 2020
8 List Gipsump 14 cm lbr 15,985 Buku Jurnal Edisi 39 Tahun 2020
9 Akustik Amstrong NDF. 0,60 x 1,20 x 0,015 lbr 20,960 Buku Jurnal Edisi 39 Tahun 2020
10 Akustik Amstrong NDF. 0,30 x 0,60 x 0,015 lbr 17,556 Buku Jurnal Edisi 39 Tahun 2020
11 Akustik Amstrong NDF. 0,30 x 0,30 x 0,015 lbr 10,490 Buku Jurnal Edisi 39 Tahun 2020
12 Jabarwood 4 mm 1,20 x 2,40 lbr 76,847 Buku Jurnal Edisi 39 Tahun 2020
13 Partikel board, 1.20 x 2.40 lbr 88,159 Buku Jurnal Edisi 39 Tahun 2020
14 Soft board, 1.20 x 2.40 lbr 53,480 Buku Jurnal Edisi 39 Tahun 2020
15 Dome Gipsump type Merak dia 85 cm bh 273,480 Buku Jurnal Edisi 39 Tahun 2020
16 Dome Gipsump type Bunga dia 90 cm bh 334,260 Buku Jurnal Edisi 39 Tahun 2020
17 Eternit hardflex 5 mm, uk. 1.05 x 2.40 lbr 88,159 Buku Jurnal Edisi 39 Tahun 2020

XXIV FIBERGLASS DAN POLYCARBONAT


1 Atap Fiberglass tipis, uk. 0,80 x 1,80 lbr 53,610 Buku Jurnal Edisi 39 Tahun 2020
2 Atap Fiberglass tebal, uk. 0,80 x 1,80 lbr 108,300 Buku Jurnal Edisi 39 Tahun 2020
3 Twinlight (2.10 x 11.80) lbr 2,692,880 Buku Jurnal Edisi 39 Tahun 2020

XXV PERLENGKAPAN SANITASI AIR BERSIH DAN AIR KOTOR


1 Shower dengan Tiang bh 428,611 Buku Jurnal Edisi 39 Tahun 2020
2 Shower tanpa Tiang bh 146,950 Buku Jurnal Edisi 39 Tahun 2020
3 Kran tembok San Ei 1/2" bh 93,590 Buku Jurnal Edisi 39 Tahun 2020
4 Kran tembok ITAP 1/2" bh 127,608 Buku Jurnal Edisi 39 Tahun 2020
5 Kran bebek San Ei 1/2" bh 115,470 Buku Jurnal Edisi 39 Tahun 2020
6 Kran bebek ITAP 1/2" bh 103,310 Buku Jurnal Edisi 39 Tahun 2020
7 Kran panas/dingin Standar bh 345,310 Buku Jurnal Edisi 39 Tahun 2020
8 Tempat sabun porselein bh 67,861 Buku Jurnal Edisi 39 Tahun 2020
9 Floor drain San Ei bh 200,510 Buku Jurnal Edisi 39 Tahun 2020
10 Floor drain Lokal bh 48,620 Buku Jurnal Edisi 39 Tahun 2020
11 Wastafel lengkap + cermin bh 2,374,640 Buku Jurnal Edisi 39 Tahun 2020
12 Wastafel bulat warna standar, lengkap bh 2,199,228 Buku Jurnal Edisi 39 Tahun 2020
13 Wastafel lengkap + cermin, ex TOTO type L. 38 VI bh 1,132,025 Buku Jurnal Edisi 39 Tahun 2020
14 Wastafel lengkap + cermin, ex TOTO type LW. 211 CJ bh 1,303,156 Buku Jurnal Edisi 39 Tahun 2020
15 Wastafel lengkap + cermin, ex I N A type LW. 230 bh 425,420 Buku Jurnal Edisi 39 Tahun 2020
16 Kloset jongkok porselen, warna bh 425,420 Buku Jurnal Edisi 39 Tahun 2020
17 Kloset jongkok Standar putih porselen bh 250,702 Buku Jurnal Edisi 39 Tahun 2020
18 Kloset jongkok teraso bh 66,850 Buku Jurnal Edisi 39 Tahun 2020
19 Kloset duduk porselen TOTO, warna standard lengkap bh 2,502,705 Buku Jurnal Edisi 39 Tahun 2020
20 Kloset duduk porselen TOTO, standard lengkap, warna tua bh 2,045,680 Buku Jurnal Edisi 39 Tahun 2020
21 Kloset duduk porselen INA, standard lengkap, warna tua bh 943,310 Buku Jurnal Edisi 39 Tahun 2020
22 Penyekat urinoir Porselein lbr 853,600 Buku Jurnal Edisi 39 Tahun 2020
23 Kitchen zink stainless standar 1 lobang bh 312,070 Buku Jurnal Edisi 39 Tahun 2020
24 Kitchen zink stainless Non standar 1 lobang bh 469,620 Buku Jurnal Edisi 39 Tahun 2020
25 Kitchen zink stainless Non standar 2 lobang bh 1,628,799 Buku Jurnal Edisi 39 Tahun 2020
26 Bak mandi fibre glass, uk. Kecil bh 276,250 Buku Jurnal Edisi 39 Tahun 2020
27 Bak mandi fibre glass, uk. Besar bh 359,120 Buku Jurnal Edisi 39 Tahun 2020
28 Bak mandi Teraso bh 168,026 Buku Jurnal Edisi 39 Tahun 2020
29 Badkip TOTO, FB. 1500/1700 STD bh 4,196,945 Buku Jurnal Edisi 39 Tahun 2020
30 Bak cuci piring teraso bh 122,353 Buku Jurnal Edisi 39 Tahun 2020
XXVI GEOTEKSTILE
1 Geotextile m2 33,420 Buku Jurnal Edisi 39 Tahun 2020
2 Geotextile Non Woven Polypropyline (gramasi 300gr) - Kelas 3 m2 7,906 Buku Jurnal Edisi 39 Tahun 2020
3 Geotextile Non Woven Polypropyline (gramasi 400gr) - Kelas 2 m2 10,175 Buku Jurnal Edisi 39 Tahun 2020
4 Geotextile Non Woven Polypropyline (gramasi 600gr) - Kelas 1 m2 9,373,964 Buku Jurnal Edisi 39 Tahun 2020
5 Geotextile Woven Polypropyline (gramasi 150gr) - Kelas 3 m2 7,288 Buku Jurnal Edisi 39 Tahun 2020
6 Geotextile Woven Polypropyline (gramasi 200gr) - Kelas 2 m2 8,938 Buku Jurnal Edisi 39 Tahun 2020
7 Geotextile Woven Polypropyline (gramasi 250gr) - Kelas 1 m2 8,594 Buku Jurnal Edisi 39 Tahun 2020

XXVII BETON READY MIX


1 Lantai Kerja Beton K-100 m3 933,813 Buku Jurnal Edisi 39 Tahun 2020
2 Beton K-125 m3 614,831 Buku Jurnal Edisi 39 Tahun 2020
3 Beton K-150 m3 1,032,359 Buku Jurnal Edisi 39 Tahun 2020
4 Beton K-175 m3 675,013 Buku Jurnal Edisi 39 Tahun 2020
5 Beton K-200 m3 670,133 Buku Jurnal Edisi 39 Tahun 2020
6 Beton K-225 m3 692,092 Buku Jurnal Edisi 39 Tahun 2020
7 Beton K-250 m3 1,632,319 Buku Jurnal Edisi 39 Tahun 2020
8 Beton K-275 m3 2,241,800 Buku Jurnal Edisi 39 Tahun 2020
9 Beton K-300 m3 739,261 Buku Jurnal Edisi 39 Tahun 2020
10 Beton K-325 m3 743,327 Buku Jurnal Edisi 39 Tahun 2020
11 Beton K-350 m3 756,340 Buku Jurnal Edisi 39 Tahun 2020
12 Beton Siklop m3 9,708,238 Buku Jurnal Edisi 39 Tahun 2020
13 Biaya Pompa Ready Mix m3 60,995 Buku Jurnal Edisi 39 Tahun 2020
14 Beton Ready Mix K-600 m3 891,298 Buku Jurnal Edisi 39 Tahun 2020
15 Beton Ready Mix K-500 m3 891,298 Buku Jurnal Edisi 39 Tahun 2020
16 Beton Ready Mix K-450 m3 864,226 Buku Jurnal Edisi 39 Tahun 2020
17 Beton Ready Mix K-400 m3 850,689 Buku Jurnal Edisi 39 Tahun 2020
18 Beton Ready Mix K-350 m3 827,001 Buku Jurnal Edisi 39 Tahun 2020
19 Beton Ready Mix K-250 m3 822,601 Buku Jurnal Edisi 39 Tahun 2020
20 Beton Ready Mix K-175 m3 808,388 Buku Jurnal Edisi 39 Tahun 2020
21 Beton Ready Mix K-125 kg 793,160 Buku Jurnal Edisi 39 Tahun 2020
22 Beton K-175 m3 1,613,463 Buku Jurnal Edisi 39 Tahun 2020
23 Beton K-175 m3 2,211,770 Buku Jurnal Edisi 39 Tahun 2020
24 Beton K-300 m3 2,278,075.51 Buku Jurnal Edisi 39 Tahun 2020
25 Beton K-300 m3 687,211.90 Buku Jurnal Edisi 39 Tahun 2020
26 Beton Manhole K350 m3 1,502,111.69 Buku Jurnal Edisi 39 Tahun 2020

XXVIII BAHAN BANGUNAN LAINNYA


1 Soda Coustic kg 19,339 Buku Jurnal Edisi 39 Tahun 2020
2 Wallpaper (kelas menengah) m2 60,770 Buku Jurnal Edisi 39 Tahun 2020
3 Wallpaper biasa, uk. 0.50 x 10.00 m rol 113,640 Buku Jurnal Edisi 39 Tahun 2020
4 Wallpaper corak, uk. 0.50 x 10.00 m rol 267,410 Buku Jurnal Edisi 39 Tahun 2020
5 Acrylic (1.40 x 2.50) lbr 729,300 Buku Jurnal Edisi 39 Tahun 2020
6 Lantai kayu (gymfloor) m2 165,750 Buku Jurnal Edisi 39 Tahun 2020
7 Floor Hardener kg 18,230 Buku Jurnal Edisi 39 Tahun 2020
8 Lantai Parquet motif jati uk. 1.2 x 5.0 x 25.00 cm m2 230,459 Buku Jurnal Edisi 39 Tahun 2020
9 Lantai Parquet motif jati uk. 1.2 x 5.0 x 30.00 cm m2 139,710 Buku Jurnal Edisi 39 Tahun 2020
10 Flooring Jati uk. 1.50 x 9.0 x 60/90 - 105.00 cm m2 408,541 Buku Jurnal Edisi 39 Tahun 2020
11 Flooring Dedan uk. 1.50 x 9.0 x 60/75/90.00 cm m2 117,660 Buku Jurnal Edisi 39 Tahun 2020
12 Karpet ex. Lokal, Long life (l = 4.00 m) m 73,530 Buku Jurnal Edisi 39 Tahun 2020
13 Karpet ex. Lokal, Wonder (l = 4.00 m) m 200,550 Buku Jurnal Edisi 39 Tahun 2020
14 Karpet ex. Lokal, Dinasty (l = 4.00 m) m 100,270 Buku Jurnal Edisi 39 Tahun 2020
15 Lantai kayu HDM ex Germany uk. 18.50 x 118.40 x 7.00 cm m2 360,320 Buku Jurnal Edisi 39 Tahun 2020
16 Klem Stang komplit bh 401,110 Buku Jurnal Edisi 39 Tahun 2020
17 Isolasi besar bh 8,300 Buku Jurnal Edisi 39 Tahun 2020
18 Waterstop Lebar 150 mm roll 1,783,908 Buku Jurnal Edisi 39 Tahun 2020
19 Waterstop Lebar 200 mm roll 2,234,682 Buku Jurnal Edisi 39 Tahun 2020
20 Waterstop Lebar 220 - 320 mm roll 2,621,040 Buku Jurnal Edisi 39 Tahun 2020
21 Penggantung Plafond bh 18,617 Buku Jurnal Edisi 39 Tahun 2020
22 Shear Connector bh 25,000 Buku Jurnal Edisi 39 Tahun 2020
23 Hook Panjang Komplit Dg. Ring bh 1,700 Buku Jurnal Edisi 39 Tahun 2020
24 Venetion Blind dan Vertical Blind m2 215,000 Buku Jurnal Edisi 39 Tahun 2020
25 Seal Tape bh 1,250 Buku Jurnal Edisi 39 Tahun 2020
26 Alumunium foil roll 324,738 Buku Jurnal Edisi 39 Tahun 2020
27 Alumunium foil, uk. 1.25 x 60.00 m m2 3,860 Buku Jurnal Edisi 39 Tahun 2020
28 Alumunium foil, uk. 2.50 x 60.00 m m2 5,240 Buku Jurnal Edisi 39 Tahun 2020
29 Air PDAM m3 8,840 Buku Jurnal Edisi 39 Tahun 2020
30 Ijuk (20 kg/m2) kg 13,810 Buku Jurnal Edisi 39 Tahun 2020
31 Slang plastik untuk waterpass dia 0,5 cm m2 2,760 Buku Jurnal Edisi 39 Tahun 2020
32 Karbit m 16,570 Buku Jurnal Edisi 39 Tahun 2020
33 Ayakan Sortiran bh 51,900 Buku Jurnal Edisi 39 Tahun 2020
34 Waterpass Allumunium 60 cm bh 67,730 Buku Jurnal Edisi 39 Tahun 2020
35 Got beton 1/2 diameter 20 cm m' 68,750 Buku Jurnal Edisi 39 Tahun 2020
36 Got beton 1/2 diameter 30 cm m' 83,050 Buku Jurnal Edisi 39 Tahun 2020
37 Cat, dan bahan lainnya m2 50,000 Buku Jurnal Edisi 39 Tahun 2020
38 Bahan Pengawet Kreosot ltr 7,465 Buku Jurnal Edisi 39 Tahun 2020
39 Pengantung ls 18,150 Buku Jurnal Edisi 39 Tahun 2020
40 Kabel Prategang kg 13,794 Buku Jurnal Edisi 39 Tahun 2020
41 Dudukan, Mur, Baut Dll set 50,000 Buku Jurnal Edisi 39 Tahun 2020
42 Casing m2 29,487 Buku Jurnal Edisi 39 Tahun 2020
43 Bearing Pad 450 x 500 x 60 mm bh 1,622,500 Buku Jurnal Edisi 39 Tahun 2020
44 Baut, Mur, Dll kg 10,615 Buku Jurnal Edisi 39 Tahun 2020
45 Air ltr 11,922,847 Buku Jurnal Edisi 39 Tahun 2020
46 Sewa Pasir Specs: (50% Harga Pasir) m3 41,250 Buku Jurnal Edisi 39 Tahun 2020
47 Pondasi Tiang Lampu ls 75,000 Buku Jurnal Edisi 39 Tahun 2020
48 Isolasi besar bh 8,366 Buku Jurnal Edisi 39 Tahun 2020
49 Ram Kawat Penutup Lampu Tanam bh 15,000 Buku Jurnal Edisi 39 Tahun 2020
50 Vinyl Permalium m2 495,000 Buku Jurnal Edisi 39 Tahun 2020
51 HCL/Air Keras ltr 28,457 Buku Jurnal Edisi 39 Tahun 2020
52 Abu/Bubuk Genteng Specs: (1 krg - 50 kg) krg 39,500 Buku Jurnal Edisi 39 Tahun 2020
53 Rubber Tile Floor Specs: t. 2 cm m2 272,361 Buku Jurnal Edisi 39 Tahun 2020
54 Aspal Bag @25 Kg bag 295,000 Buku Jurnal Edisi 39 Tahun 2020
55 Borderan bh 20,000 Buku Jurnal Edisi 39 Tahun 2020
56 Head Flash Light bh 50,000 Buku Jurnal Edisi 39 Tahun 2020
57 Bloor Flash Light bh 100,000 Buku Jurnal Edisi 39 Tahun 2020
58 Masker Biasa bh 23,000 Buku Jurnal Edisi 39 Tahun 2020
59 Lampu Senter (Charger) bh 187,000 Buku Jurnal Edisi 39 Tahun 2020
60 Head Flash Light bh 71,503 Buku Jurnal Edisi 39 Tahun 2020
61 Lampu Pengaman Lalu Lintas 3" bh 82,500 Buku Jurnal Edisi 39 Tahun 2020
62 Terpal Kanvas bh 1,800,000 Buku Jurnal Edisi 39 Tahun 2020
63 Plang Pengaman Jalan bh 380,000 Buku Jurnal Edisi 39 Tahun 2020
64 Barrier Jalan bh 998,777 Buku Jurnal Edisi 39 Tahun 2020
65 Meteran 5 m bh 13,500 Buku Jurnal Edisi 39 Tahun 2020
66 Meteran Rol 30 m (Pita) bh 82,500 Buku Jurnal Edisi 39 Tahun 2020
67 Meteran Rol 50 m bh 93,000 Buku Jurnal Edisi 39 Tahun 2020
68 Meteran Roda Digital bh 2,500,000 Buku Jurnal Edisi 39 Tahun 2020
69 Singkup Gagang Besi bh 900,000 Buku Jurnal Edisi 39 Tahun 2020
70 Singkup Saluran bh 65,000 Buku Jurnal Edisi 39 Tahun 2020
71 Singkup Gagang Kayu bh 65,000 Buku Jurnal Edisi 39 Tahun 2020
72 Cangkul bh 75,000 Buku Jurnal Edisi 39 Tahun 2020
73 Linggis Besar bh 100,000 Buku Jurnal Edisi 39 Tahun 2020
74 Balincong bh 100,000 Buku Jurnal Edisi 39 Tahun 2020
75 Belehem bh 75,000 Buku Jurnal Edisi 39 Tahun 2020
76 Leker Besi bh 76,000 Buku Jurnal Edisi 39 Tahun 2020
77 Gacok 4 Gigi Gagang Pendek Besi bh 93,000 Buku Jurnal Edisi 39 Tahun 2020
78 Gacok 4 Gigi Gagang Panjang Kayu bh 43,000 Buku Jurnal Edisi 39 Tahun 2020
79 Plat Eiser Specs: (0,06 x 1,2 x 2,4)m bh 1,175,000 Buku Jurnal Edisi 39 Tahun 2020
80 Patik bh 115,000 Buku Jurnal Edisi 39 Tahun 2020
81 Kampak bh 90,000 Buku Jurnal Edisi 39 Tahun 2020
82 Palu 10 kg Martil bh 110,000 Buku Jurnal Edisi 39 Tahun 2020
83 Bakrik dengan gagang Besi 3m bh 925,000 Buku Jurnal Edisi 39 Tahun 2020
84 Bakrik dengan gagang Kayu 3m bh 50,000 Buku Jurnal Edisi 39 Tahun 2020
85 Palu 2,5 kg bh 95,000 Buku Jurnal Edisi 39 Tahun 2020
86 Palu 5 kg bh 110,000 Buku Jurnal Edisi 39 Tahun 2020
87 Parang bh 22,000 Buku Jurnal Edisi 39 Tahun 2020
88 Golok baja bh 135,000 Buku Jurnal Edisi 39 Tahun 2020
89 Gotongan Aspal pasang 143,000 Buku Jurnal Edisi 39 Tahun 2020
90 Sapu Lidi Ikat Besar bh 18,000 Buku Jurnal Edisi 39 Tahun 2020
91 Sikat Injuk bh 12,081 Buku Jurnal Edisi 39 Tahun 2020
92 Sikat Kawat Baja bh 11,000 Buku Jurnal Edisi 39 Tahun 2020
93 Gergaji Kayu bh 110,000 Buku Jurnal Edisi 39 Tahun 2020
94 Gergaji Besi bh 135,000 Buku Jurnal Edisi 39 Tahun 2020
95 Pengki Karet bh 11,000 Buku Jurnal Edisi 39 Tahun 2020
96 Pengki Plat bh 49,000 Buku Jurnal Edisi 39 Tahun 2020
97 Pita Pengaman m 4,500 Buku Jurnal Edisi 39 Tahun 2020
98 Palu Timbris 10 kg bh 270,000 Buku Jurnal Edisi 39 Tahun 2020
99 Kikir Besi bh 27,500 Buku Jurnal Edisi 39 Tahun 2020
100 Ember Karet Besar bh 9,900 Buku Jurnal Edisi 39 Tahun 2020
101 List Allumunium m1 9,000 Buku Jurnal Edisi 39 Tahun 2020
102 HPL lbr 75,000 Buku Jurnal Edisi 39 Tahun 2020
103 Jet Shower set 565,000 Buku Jurnal Edisi 39 Tahun 2020
104 Fix Shower ex TOTO tx422SC set 1,674,323 Buku Jurnal Edisi 39 Tahun 2020
105 Mix Shower tx417SBCBR set 3,239,548 Buku Jurnal Edisi 39 Tahun 2020
106 Sanding sealler kg 65,439 Buku Jurnal Edisi 39 Tahun 2020
107 Rel Pintu Geser set 100,000 Buku Jurnal Edisi 39 Tahun 2020
108 Profil kayu jati m1 330,000 Buku Jurnal Edisi 39 Tahun 2020
109 Skrup gypsum bh 900 Buku Jurnal Edisi 39 Tahun 2020
110 Finishing Melamic m1 133,100 Buku Jurnal Edisi 39 Tahun 2020
111 Profil Kayu Samarinda m1 10,500,000 Buku Jurnal Edisi 39 Tahun 2020
112 Marmer Travertine m2 1,291,263 Buku Jurnal Edisi 39 Tahun 2020
113 Calsiplank m1 875 Buku Jurnal Edisi 39 Tahun 2020
114 Path Lock set 48,658 Buku Jurnal Edisi 39 Tahun 2020
115 Floor Hinge set 1,429,914 Buku Jurnal Edisi 39 Tahun 2020
116 Lever handle set 521,469 Buku Jurnal Edisi 39 Tahun 2020
117 Lockcase set 85,250 Buku Jurnal Edisi 39 Tahun 2020
118 Escutheon set 41,559 Buku Jurnal Edisi 39 Tahun 2020
119 Flush Bolt set 173,351 Buku Jurnal Edisi 39 Tahun 2020
120 Rambucis set 16,420 Buku Jurnal Edisi 39 Tahun 2020
121 Engsel Casement set 114,798 Buku Jurnal Edisi 39 Tahun 2020
122 Door Holder set 56,046 Buku Jurnal Edisi 39 Tahun 2020
123 NYM 3 X 2,5 m1 13,796 Buku Jurnal Edisi 39 Tahun 2020
124 Inbow-dus bh 4,500 Buku Jurnal Edisi 39 Tahun 2020
125 Stop kontak bh 15,764 Buku Jurnal Edisi 39 Tahun 2020
126 Saklar Engkel bh 22,500 Buku Jurnal Edisi 39 Tahun 2020
127 Saklar Seri bh 27,500 Buku Jurnal Edisi 39 Tahun 2020
128 Lampu SL Philip 25 Watt bh 95,000 Buku Jurnal Edisi 39 Tahun 2020
129 Fiting Lampu bh 17,500 Buku Jurnal Edisi 39 Tahun 2020
130 Lampu TL 18 watt + Asesories bh 12,441 Buku Jurnal Edisi 39 Tahun 2020
131 Lampu TL 36 watt + Asesories bh 250,000 Buku Jurnal Edisi 39 Tahun 2020
132 Lampu DL Philip 18 Watt bh 63,820 Buku Jurnal Edisi 39 Tahun 2020
133 Kran wastafel bh 1,205,000 Buku Jurnal Edisi 39 Tahun 2020
134 Kran wudhu bh 275,000 Buku Jurnal Edisi 39 Tahun 2020
135 Sticker Sunblast m2 65,000 Buku Jurnal Edisi 39 Tahun 2020
136 Lampu Gantung LED 20 watt EX. Philips bh 441,000 Tokopedia
137 Lampu TL LED 12 watt EX. Philips bh 37,000 Tokopedia
138 Lampu TL LED 20 watt EX. Philips bh 40,000 Tokopedia
139 Lampu Down Light LED 8 watt EX. Philips bh 44,000 Tokopedia
XXIX KAYU
1 Bambu dia 5 - 7 cm btg 24,860 Buku Jurnal Edisi 39 Tahun 2020
2 Bambu dia 7 - 10 cm btg 35,910 Buku Jurnal Edisi 39 Tahun 2020
3 Bambu Gombong btg 55,790 Buku Jurnal Edisi 39 Tahun 2020
4 Kayu Terentang m3 5,202,019 Buku Jurnal Edisi 39 Tahun 2020
5 Kayu kamper Singkil/Kapur m3 9,835,737 Buku Jurnal Edisi 39 Tahun 2020
6 Kayu balok Borneo super m3 4,922,770 Buku Jurnal Edisi 39 Tahun 2020
7 Kayu papan Borneo super m3 5,687,430 Buku Jurnal Edisi 39 Tahun 2020
8 Kayu balok kamper Medan m3 10,873,181 Buku Jurnal Edisi 39 Tahun 2020
9 Kayu papan kamper Medan m3 11,489,579 Buku Jurnal Edisi 39 Tahun 2020
10 Kayu balok kamper Banjar m3 10,645,231 Buku Jurnal Edisi 39 Tahun 2020
11 Kayu papan kamper Banjar m3 11,064,025 Buku Jurnal Edisi 39 Tahun 2020
12 Kayu balok kamper Samarinda m3 14,781,769 Buku Jurnal Edisi 39 Tahun 2020
13 Kayu papan kamper Samarinda m3 10,381,656 Buku Jurnal Edisi 39 Tahun 2020
14 Kayu balok Rasamala m3 6,381,537 Buku Jurnal Edisi 39 Tahun 2020
15 Kayu Jati Jateng Tua lepas Mata dari 80 cm ke atas m3 39,804,691 Buku Jurnal Edisi 39 Tahun 2020
16 Kayu Jati Jabar Tua lepas Mata dari 80 cm ke atas m3 18,870,630 Buku Jurnal Edisi 39 Tahun 2020
17 Kayu Jati Jabar 40 cm ke atas m3 17,490,030 Buku Jurnal Edisi 39 Tahun 2020
18 Kayu balok Albasia m3 1,884,020 Buku Jurnal Edisi 39 Tahun 2020
19 Kayu papan Albasia m3 2,005,570 Buku Jurnal Edisi 39 Tahun 2020
20 Dolken dia 5 s/d 7 cm btg 40,995 Buku Jurnal Edisi 39 Tahun 2020
21 Dolken dia 8 s/d 10 cm btg 32,700 Buku Jurnal Edisi 39 Tahun 2020
22 List profil kayu kamper 1 cm m 7,696 Buku Jurnal Edisi 39 Tahun 2020
23 List profil kayu kamper 2 cm m 4,980 Buku Jurnal Edisi 39 Tahun 2020
24 List profil kayu kamper 4 cm m 6,280 Buku Jurnal Edisi 39 Tahun 2020
25 List profil kayu kamper 5 cm m 8,440 Buku Jurnal Edisi 39 Tahun 2020
26 List profil kayu kamper 10 cm m 24,730 Buku Jurnal Edisi 39 Tahun 2020
27 Pegangan tangga (Balustrade) profil jati m 268,463 Buku Jurnal Edisi 39 Tahun 2020
28 Pegangan tangga (Balustrade) Kamper Banjar m 84,305 Buku Jurnal Edisi 39 Tahun 2020
29 Reng uk. 2/3 kayu Borneo Super m3 5,687,430 Buku Jurnal Edisi 39 Tahun 2020
30 Reng uk. 2/3 kayu Kamper Banjar m3 7,018,960 Buku Jurnal Edisi 39 Tahun 2020
31 Reng uk. 3/4 kayu Kamper Banjar m3 7,018,960 Buku Jurnal Edisi 39 Tahun 2020
32 Kayu kaso Borneo, uk. 5/7 m3 5,687,430 Buku Jurnal Edisi 39 Tahun 2020
33 Bilik bambu (Tanpa kulit) ukuran 2 x 2,50 m lbr 30,413 Buku Jurnal Edisi 39 Tahun 2020
34 Bilik bambu (Dengan kulit) ukuran 2 x 2,50 m lbr 89,580 Buku Jurnal Edisi 39 Tahun 2020
35 Bilik bambu hitam Variasi m2 50,762 Buku Jurnal Edisi 39 Tahun 2020
36 Multiplek 9 mm, uk. 1,20 x 2,40 lbr 151,930 Buku Jurnal Edisi 39 Tahun 2020
37 Multiplek 12 mm, uk. 1,20 x 2,40 lbr 194,480 Buku Jurnal Edisi 39 Tahun 2020
38 Multiplek 18 mm, uk. 1,20 x 2,40 lbr 383,307 Buku Jurnal Edisi 39 Tahun 2020
39 Plywood 18 mm, uk. 1,20 x 2,40 lbr 357,350 Buku Jurnal Edisi 39 Tahun 2020
40 Plywood 9 mm, uk. 1,20 x 2,40 lbr 234,493 Buku Jurnal Edisi 39 Tahun 2020
41 Taekwood 3 mm, uk. 1,20 x 2,40 lbr 163,534 Buku Jurnal Edisi 39 Tahun 2020
42 Taekwood 4 mm, uk. 1,20 x 2,40 lbr 210,153 Buku Jurnal Edisi 39 Tahun 2020
43 Taekwood 4 mm, ukuran pintu lbr 124,834 Buku Jurnal Edisi 39 Tahun 2020
44 Triplek 3 mm 1,20 x 2,40 lbr 52,260 Buku Jurnal Edisi 39 Tahun 2020
45 Triplek 4 mm 1,20 x 2,40 lbr 64,420 Buku Jurnal Edisi 39 Tahun 2020
46 Triplek 4 mm, ukuran pintu lbr 68,892 Buku Jurnal Edisi 39 Tahun 2020
47 Triplex 6 mm 1,20 x 2,40 lbr 138,523 Buku Jurnal Edisi 39 Tahun 2020
48 Melamin 4 mm, uk. 1,20 x 2,40 lbr 129,199 Buku Jurnal Edisi 39 Tahun 2020
48 Melamin TIK 4 mm lbr 236,792 Buku Jurnal Edisi 39 Tahun 2020
49 Formika putih polos, uk. 1,20 x 2,40 lbr 260,471 Buku Jurnal Edisi 39 Tahun 2020
50 Formika motif, ukuran pintu lbr 166,494 Buku Jurnal Edisi 39 Tahun 2020
51 Kayu Bakar m3 450,000 Buku Jurnal Edisi 39 Tahun 2020
52 Kay Perancah m3 3,870,065 Buku Jurnal Edisi 39 Tahun 2020
53 Kayu Acuan m3 1,980,000 Buku Jurnal Edisi 39 Tahun 2020
54 Cerucuk (Kayu Galam Dia. 10 cm) m1 9,625 Buku Jurnal Edisi 39 Tahun 2020
55 Kayu Kaso btg 11,500 Buku Jurnal Edisi 39 Tahun 2020
56 Usuk 4 x 6 kayu meranti m3 4,400,000 Buku Jurnal Edisi 39 Tahun 2020
XXX LOGAM/METALURGI
1 Allumunium plat 0,25 mm (1.00 x 2.00) lbr 46,790 Buku Jurnal Edisi 39 Tahun 2020
2 Allumunium plat 0,30 mm (1.00 x 2.00) lbr 55,250 Buku Jurnal Edisi 39 Tahun 2020
3 Allumunium plat 0,40 mm (1.00 x 2.00) lbr 60,770 Buku Jurnal Edisi 39 Tahun 2020
4 Allumunium plat 0,50 mm (1.00 x 2.00) lbr 72,930 Buku Jurnal Edisi 39 Tahun 2020
5 Allumunium plat 0,60 mm (1.00 x 2.00) lbr 91,160 Buku Jurnal Edisi 39 Tahun 2020
6 Allumunium profil uk. 3"4.00 m (bahan kusen) ex. EDICO Natural btg 206,630 Buku Jurnal Edisi 39 Tahun 2020
7 Allumunium profil uk. 4"4.00 m (bahan kusen) ex. EDICO Natural btg 237,020 Buku Jurnal Edisi 39 Tahun 2020
8 Allumunium profil uk. 3"4.00 m (bahan kusen) ex. EDICO Warna btg 218,790 Buku Jurnal Edisi 39 Tahun 2020
9 Allumunium profil uk. 4"4.00 m (bahan kusen) ex. EDICO Warna btg 243,100 Buku Jurnal Edisi 39 Tahun 2020
10 Allumunium profil uk. 3"4.00 m (bahan kusen) ex. YKK Natural btg 230,940 Buku Jurnal Edisi 39 Tahun 2020
11 Allumunium profil uk. 4"4.00 m (bahan kusen) ex. YKK Natural btg 388,960 Buku Jurnal Edisi 39 Tahun 2020
12 Allumunium profil uk. 3"4.00 m (bahan kusen) ex. YKK Warna btg 269,840 Buku Jurnal Edisi 39 Tahun 2020
13 Allumunium profil uk. 4"4.00 m (bahan kusen) ex. YKK Warna btg 397,150 Buku Jurnal Edisi 39 Tahun 2020
14 Allumunium daun pintu/Jendela m 54,940 Buku Jurnal Edisi 39 Tahun 2020
15 Allumunium sheet m2 82,870 Buku Jurnal Edisi 39 Tahun 2020
16 Allumunium profil "T" 4.00 m (bahan rangka plafond) btg 18,233 Buku Jurnal Edisi 39 Tahun 2020

XXXI ALAT LISTRIK


1 Kabel power m 6,680 Buku Jurnal Edisi 39 Tahun 2020
2 Kabel elektroda m 10,330 Buku Jurnal Edisi 39 Tahun 2020
3 Kabel NYFGBY 4 x 10 qmm (Supreme) roll 142,210 Buku Jurnal Edisi 39 Tahun 2020
4 Kabel NYFGBY 4 x 25 qmm (Supreme) roll 254,080 Buku Jurnal Edisi 39 Tahun 2020
5 Kabel NYM 2 x 2,5 qmm "Prime/Eterna" m 8,796 Buku Jurnal Edisi 39 Tahun 2020
6 Kabel TIC 2 x 10 qmm "SPLN" Lokal m 6,560 Buku Jurnal Edisi 39 Tahun 2020
7 Kabel Gulung [CR-2810] Specs: Kabel Roll 10M (dgn arde) bh 137,500 Buku Jurnal Edisi 39 Tahun 2020
8 Kabel Gulung [CR-2815] Specs: Kabel Roll 15M (dgn arde) bh 170,500 Buku Jurnal Edisi 39 Tahun 2020
9 Kabel NYM Specs: 2 x 1,5 sqmm m 8,000 Buku Jurnal Edisi 39 Tahun 2020
10 Kabel NYM Specs: 2 x 2,5 sqmm m 9,680 Buku Jurnal Edisi 39 Tahun 2020
11 Kabel NYM Specs: 3 x 1,5 sqmm m 8,397 Buku Jurnal Edisi 39 Tahun 2020
12 Kabel NYM Specs: 3 x 2,5 sqmm m 11,330 Buku Jurnal Edisi 39 Tahun 2020
13 Kabel NYY Specs: 2 x 1,5 sqmm m 6,640 Buku Jurnal Edisi 39 Tahun 2020
14 Kabel NYY Specs: 3 x 1,5 sqmm m 8,397 Buku Jurnal Edisi 39 Tahun 2020
15 Kabel NYY Specs: 3 x 4 sqmm m 26,620 Buku Jurnal Edisi 39 Tahun 2020
16 Kabel NYY Specs: 3 x 6 sqmm m 31,400 Buku Jurnal Edisi 39 Tahun 2020
17 Kabel NYFGBY Specs: 2 X 10 sqmm m 81,500 Buku Jurnal Edisi 39 Tahun 2020
18 Kabel Nya 2,5 Sqmm m 3,763 Buku Jurnal Edisi 39 Tahun 2020
19 Kabel NYY 4 x 35 mm2 m 175,108 Buku Jurnal Edisi 39 Tahun 2020
20 Kabel NYY 4 x 6 mm2 m 98,530 Buku Jurnal Edisi 39 Tahun 2020
21 Kabel NYYHY 3 x 2.5 mm2 m 30,425 Buku Jurnal Edisi 39 Tahun 2020
22 Kabel Nyfgby 4 x 50 mm2 m 363,000 Buku Jurnal Edisi 39 Tahun 2020
23 Kabel NYMHY 3 x 1,5 tunggal Specs: 50 meter roll 350,000 Buku Jurnal Edisi 39 Tahun 2020
24 Kabel NYMHY 3 x 2,5 tunggal Specs: 50 meter roll 450,000 Buku Jurnal Edisi 39 Tahun 2020
25 Kabel NYMHY 3 x 0,75 (putih) Specs: 50 meter roll 230,000 Buku Jurnal Edisi 39 Tahun 2020
26 Lampu pijar 25 watt s/d 100 watt bh 22,100 Buku Jurnal Edisi 39 Tahun 2020
27 Lampu Neon TL 20 watt bh 82,870 Buku Jurnal Edisi 39 Tahun 2020
28 Lampu Neon TL 40 watt bh 99,450 Buku Jurnal Edisi 39 Tahun 2020
29 Down Light + SL 25 watt bh 212,710 Buku Jurnal Edisi 39 Tahun 2020
30 Lampu Sirkel TL 20 watt Lengkap bh 77,350 Buku Jurnal Edisi 39 Tahun 2020
31 Lampu Mercury 80 watt bh 193,370 Buku Jurnal Edisi 39 Tahun 2020
32 Lampu Mercury 400 watt bh 1,185,110 Buku Jurnal Edisi 39 Tahun 2020
33 Lampu Taman + Tiang + Lampu 1 buah bh 467,960 Buku Jurnal Edisi 39 Tahun 2020
34 Lampu Baret 30 cm + Neon bh 401,110 Buku Jurnal Edisi 39 Tahun 2020
35 Lampu Neon Acrylik 2 x 40 watt bh 273,480 Buku Jurnal Edisi 39 Tahun 2020
36 Lampu SON 250W/220V "PHILIPS" bh 158,250 Buku Jurnal Edisi 39 Tahun 2020
37 Lampu SON 150W/220V "PHILIPS" bh 137,100 Buku Jurnal Edisi 39 Tahun 2020
38 Lampu HPL 250W/220V "PHILIPS" bh 72,200 Buku Jurnal Edisi 39 Tahun 2020
39 Lampu HPL 150W/220V "PHILIPS" bh 32,810 Buku Jurnal Edisi 39 Tahun 2020
40 Lampu HPL 80W/220V "PHILIPS" bh 32,810 Buku Jurnal Edisi 39 Tahun 2020
41 Lampu LHE 40W/220V "HITACHI" bh 148,040 Buku Jurnal Edisi 39 Tahun 2020
42 Lampu LHE 85W/220V "SINYOKU" bh 291,720 Buku Jurnal Edisi 39 Tahun 2020
43 Lampu LU 250W/220V (Integral Ignitor) Komplit "GE" bh 289,700 Buku Jurnal Edisi 39 Tahun 2020
44 Stop Kontak 1 Lubang [6130] Specs: Stop Kontak 1 Lb, Tanpa Kabel bh 11,000 Buku Jurnal Edisi 39 Tahun 2020
45 Stop Kontak 2 Lubang [1542011] Specs: Stop Kontak 2 Lb, Tanpa Kabel, Cream bh 33,000 Buku Jurnal Edisi 39 Tahun 2020
46 Stop Kontak 4 Lubang [15340] Specs: Stop Kontak 4 Lb, Tanpa Kabel, Cream bh 52,250 Buku Jurnal Edisi 39 Tahun 2020
47 Stop Kontak 5 Lubang [15351] Specs: Stop Kontak 5 Lb, Cream bh 104,500 Buku Jurnal Edisi 39 Tahun 2020
48 Lasdop Putar Connector SW2 (2,5 MM) bh 1,000 Bukalapak
49 T-Dos PVC bh 3,500 Tokopedia
50 Isolasi untuk Listrik National bh 4,000 Shopee
51 Pipa Paralon 5/8' untuk Listrik Union ljr 3,750 Tokopedia
52 Sticker Sanblast Merk Takki Kosai dan Decolux lebar 120 cm m 65,000 https://stickersandblast.com
53 Spandek 0.35 mm m2 70,000 Tokopedia
54 Print Out Lapis Vinyl m2 90,000 Tokopedia
55 Floor Hinges set 825,000 Tokopedia
56 Overpanel set 530,000 Tokopedia
57 Top patch fitting set 80,000 Tokopedia
58 Bottom patch fitting set 136,000 Tokopedia
59 pull handle paloma bh 525,000 Tokopedia
60 Keramik Homogeneus Tile 60x60 cm Black Granito-Salsa m2 528,000 Depo Bangunan
61 Keramik Homogeneus Tile 60x60 cm Black Granito-Salsa Unpolished m2 481,800 Depo Bangunan
62 Cotton plaster bh 7,000 Depo Bangunan
63 Compoun Zak 75,000 Depo Bangunan
64 Pipa PVC 4" berlubang jenis AW m 15,000 Depo Bangunan
65 Rol cat bh 84,000 Depo Bangunan
66 Steger werk (biaya penyusutan pakai) unit 30,000 Depo Bangunan
67 Ampelas lbr 5,000 Depo Bangunan
68 Pipa PVC dia 4" AW m 15,867 Depo Bangunan
69 Pipa PVC Ø 4" (AW) m 54,083 Depo Bangunan
70 Pipa pvc Ø 1/2" (AW) Wavin m 4,500 Tokopedia
71 Cat Semprot DITON CHROME ALUMINIUM 300cc btl 40,000 Tokopedia

SNI 1745-1989-F, SNI 03-3987-1995,NFPA


13. Standard For the Installation Of
72 Pengadaan dan Pemasangan Instalasi Sprinker m2 345,000 Sprinkler Systems. 2013 Edition. National
Fire Protection Association, dan Kegiatan
Pemasangan Instalasi Sprinker di Gedung
Kantor Bappenas 2019.

Anda mungkin juga menyukai