Anda di halaman 1dari 68

I

1.7.4.a.(a)
1.1.4.b.(a)
1.1.d.(c)
1.1.f.(c)
B.29.b
1.1.h (a)
1.1.h (a) (a)
1.1.h (a) (b)

II
1.7.7.1.1.a (a)
1.7.14.a (a)
1.7.14.e (a)
A.2.3.1.14

III
P.05
2.1.2.a.1.b.(a)
P.02.c.2)
1.6.1.a.(a)
3.2.2.1.1.a.(a)
3.2.2.2.11.(a)
3.2.2.2.35.(a)

IV
2.2.1.1.a.(a)
2.2.1.2.a.(a)
2.2.1.2.b.(a)
2.2.1.2.d.(a)
2.2.1.2.e.(a)
2.2.6.1.a.(a)
2.2.6.1.c.
B.11.b
D.01.a
P.09.c

VI
A.4.2.1.1.1
A.4.7.1.10.1
A.4.7.1.16.1
4.1.33.(c)
4.1.33.(c) (a)
4.1.34.(c)
4.1.36.(c)
4.1.34.(c) (a)
4.1.36.(c) (a)
A.8.4.1.17
A.8.4.1.18
A.8.4.1.19
A.8.4.1.20
A.8.4.1.21
11.5
11.6

VII
K.01.a
K.02.a
K.02.b
K.02.c
K.03.a
K.04.a
K.04.b
K.04.c
K.04.d

VIII
P.8.01
P.8.02
P.8.03

IX
11.4
P-AT-08
P-AT-09
P-AT-11
P-AT-12
P-AT-13.a
P-AT-13.b
HARGA SATUAN PEKERJAAN PERSIAPAN
Stake out trase saluran/Infrastruktur (baru) di lapangan
Papan nama pekerjaan multiflex 10 mm, frame aluminium siku dan tiang kayu 5/7, printing banner plast
Pengukuran dan pemasangan Bouwplank
Pembersihan dan Pengupasan Permukaan Tanah (Striping) a.d. Tanaman Ø 2cm
Pembongkaran Beton dengan Jack Hammer
Pembongkaran Dinding Tembok Bata
Pembongkaran penutup atap ( + pembuangan )
Pembongkaran konstruksi kuda-kuda, gording dan kusen ( + pembuangan )

HARGA SATUAN PEKERJAAN TANAH


Penggalian 1 m3 tanah biasa sedalam s/d 1 m untuk volume 200 m3 s/d 2000 m3 (manual)
Timbunan atau urugan kembali tanah biasa/tanah liat berpasir
Timbunan pasir
1 m³ Pengurugan sirtu padat

HARGA SATUAN PEKERJAAN PASANGAN


Pasangan batu kosong manual
Mortar tipe N (setara campuran 1 PC: 4 PP), fc=5,2 Mpa menggunakan molen untuk ketinggian 0 s.d.
Pasangan Bata Merah Mortar Tipe N (Menggunakan Molen)
Pasangan batu muka
Siaran dengan mortar tipe M, fc=17,2 Mpa (setara 1PC:2PP)
Plesteran tebal 1,5 cm dengan mortar tipe S, fc=12,5 Mpa (setara 1PC:3PP)
Pekerjaan Acian

HARGA SATUAN PEKERJAAN BETON


Beton untuk lantai kerja (bedding) Beton fc' = 7,4 s.d. 9,8 MPa (K-100 s.d. K-125)
Beton Mutu f'c = 7,4 MPa (K100)
Beton mutu, f'c = 16,9 Mpa (K225) Manual
Beton mutu fc = 14,5 Mpa (K-175) (Menggunakan Molen)
Beton mutu fc = 19,3 Mpa (K-225) (Menggunakan Molen)
Penulangan pelat untuk besi beton Dia < 12 mm, cara manual
Pembuatan 1 m3 balok beton bertulang (200 kg besi + bekisting)
Bekisting lantai beton biasa dengan multiflex 12 atau 18 mm (TP)
Kistdam pasir/tanah di bungkus karung plastik bagor 43x65 cm
Peilskaal/Mistar duga muka air

HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM


Pasang besi profil
Pengecatan 1 m2 Tembok Baru (1 Lapis Plamuur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
Pengecatan 1 m2 Permukaan Baja
Pemasangan pipa galvanis Ø 2"
Pemasangan pipa galvanis Ø 3"
Pemasangan pipa galvanis Ø 4"
Pemasangan pipa galvanis Ø 6"
Pemasangan 1 m' pipa Black Steel Pipe (BSP) Ø 4"--Sch 40
Pemasangan 1 m' pipa Black Steel Pipe (BSP) Ø 6"--Sch 40
(K3) Pasang pipa HDPE PN-12,5 Ø 63 mm
(K3) Pasang pipa HDPE PN-12,5 Ø 90 mm
(K3) Pasang pipa HDPE PN-12,5 Ø 110 mm
(K3) Pasang pipa HDPE PN-12,5 Ø 160 mm
Tralis, bhn besi siku, besi beton & plat strip
Pengadaan dan Pemasangan tiang besi siku L.50.50.5
Pengadaan dan Pemasangan kawat duri

HARGA SATUAN PEKERJAAN KAYU


Rangka gording & kuda - kuda kamper dan Pemasangan
Pasang kusen pintu kayu kamper
Pasang daun pintu panil kayu kamper
Pasang lisplank
Pengad. dan Pasang Seng gelombang
Pengadaan & pemasangan Kunci slot
Pengadaan & Pemasangan Engsel
Pengadaan & Pemasangan Grendel
Hag pengait daun pintu dg fisher

HARGA SATUAN PEKERJAAN PENGECATAN


Pengikisan/Pengerokan Permukaan Cat Lama
Pengecatan Dinding Lama
Pengecatan kayu ( pintu, lisplank, gording )

HARGA SATUAN PEKERJAAN LAIN - LAIN


Pengadaan dan Pemasangan Alfalfa valve
Perbaikan mesin penggerak (Non PU)
Perbaikan mesin penggerak (Non PU)
Penggantian mesin penggerak (Non PU)
Perbaikan Spare Part Mesin Pompa (Non PU)
Penggantian Baru Unit Pompa Submersible (Non PU)
Penggantian Baru Unit Pompa Turbin (Non PU)
m² 5,794.34
m² 789,669.12
m' 32,657.36
m' 12,425.18
m³ 294,225.20
m³ 82,817.60
m² 66,291.75
m³ 198,875.25

m³ 74,644.51
m³ 168,945.35
m³ 309,362.88
m³ 294,504.08

m³ 633,178.50
m³ 1,110,196.20
m³ 1,278,912.70
m² 169,790.95
m² 59,394.51
m² 45,479.28
m² 34,224.00

m³ 1,199,208.06
m³ 1,214,871.06
m³ 1,430,876.61
m³ 1,329,663.59
m³ 1,395,517.79
kg 18,873.74
m³ 15,983,584.47
m² 131,383.07
bh 17,671.36
m' 416,926.34

kg 50,046.05
m² 69,362.23
m² 46,152.93
m' 208,457.51
m' 286,772.51
m' 396,515.40
m' 649,376.14
m'
m'
m'
m'
m'
m'
m² 1,440,372.47
m' 215,211.00
m' 125,281.00

m³ 22,016,609.13
m³ 18,450,541.86
m² 1,099,477.05
m' 513,589.89
m² 115,141.45
bh 133,096.40
bh 101,547.30
bh 104,997.30
bh 49,797.30

m² 20,646.18
m² 64,893.47
m² 76,333.09

M' 537,567.50
Unit 19,602,905.75
Unit 9,897,475.00
Unit 155,038,802.50
Unit 5,969,247.50
Unit 114,352,475.25
Unit 46,941,574.00
DAFTAR KUANTITAS DAN HARGA

KODE HARGA JUMLAH


NO. URAIAN PEKERJAAN SAT VOLUME
ANALISA SATUAN HARGA

I PEKERJAAN PERSIAPAN

1 Stake out trase saluran/Infrastruktur (baru) di lapangan 1.7.4.a.(a) m² 5,794.34 -

Sistem Manajemen Keselamatan dan Kesehatan Kerja


2 Ls 1.00 3,575,000.00 3,575,000.00
(SMK3)
JUMLAH PEKERJAAN PERSIAPAN 3,575,000.00

II PEKERJAAN TANAH
Penggalian 1 m3 tanah biasa sedalam s/d 1 m untuk
1 1.7.7.1.1.a (a) m³ 1.41 74,644.51 104,987.50
volume 200 m3 s/d 2000 m3 (manual)
JUMLAH PEKERJAAN TANAH 104,987.50

III PEKERJAAN PASANGAN

Mortar tipe N (setara campuran 1 PC: 4 PP), fc=5,2 Mpa


1 2.1.2.a.1.b.(a) m³ 2.76 1,110,196.20 3,060,255.83
menggunakan molen untuk ketinggian 0 s.d. 1 m

2 Pasangan batu muka 1.6.1.a.(a) m² - 169,790.95 -


Siaran dengan mortar tipe M, fc=17,2 Mpa (setara
3 3.2.2.1.1.a.(a) m² - 59,394.51 -
1PC:2PP)

Plesteran tebal 1,5 cm dengan mortar tipe S, fc=12,5


4 3.2.2.2.11.(a) m² 8.93 45,479.28 406,129.97
Mpa (setara 1PC:3PP)
JUMLAH PEKERJAAN PLESTERAN 3,466,385.80

IV PEKERJAAN BETON
Beton mutu fc = 14,5 Mpa (K-175) (Menggunakan
1 2.2.1.2.d.(a) m³ 0.11 1,329,663.59 146,595.41
Molen)

Penulangan pelat untuk besi beton Dia < 12 mm, cara


2 2.2.6.1.a.(a) kg 7.76 18,873.74 146,543.95
manual

Bekisting lantai beton biasa dengan multiflex 12 atau 18


3 B.11.b m² 0.64 131,383.07 84,085.17
mm (TP)
JUMLAH PEKERJAAN BETON 377,224.52

V PEKERJAAN LAIN-LAIN
1 Biaya pemasangan pintu bh - 1,000,000.00 -
2 Peilskaal/Mistar duga muka air P.09.c m' 1.00 416,926.34 416,926.34

JUMLAH PEKERJAAN LAIN-LAIN 416,926.34


REKAPITULASI
RENCANA ANGGARAN BIAYA

No. JENIS PEKERJAAN JUMLAH

I PEKERJAAN PERSIAPAN 3,575,000.00

II PEKERJAAN TANAH 104,987.50

III PEKERJAAN PASANGAN 3,466,385.80

IV PEKERJAAN BETON 377,224.52

V PEKERJAAN LAIN-LAIN 416,926.34

Jumlah 7,940,524.16
PPN 11 % 873,457.66
Biaya Konstruksi Fisik (BKF) 8,813,981.82
JUMLAH PEMBULATAN 8,813,000.00

TERBILANG :
RENCANA ANGGARAN BIAYA
No. Sumur Bor :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Provinsi :

NO. URAIAN PEKERJAAN

1 2
I. PEKERJAAN PERSIAPAN
a. Papan Nama Kegiatan
b. Biaya Kesehatan dan Keselamatan Kerja

II. MESIN PENGGERAK


a. Perbaikan Mesin Penggerak (termasuk Panel dan Spare Part)
b. Penggantian Generator Set dan Pemasangan

III. POMPA
a. Perbaikan Pompa (termasuk panel dan Spare part)
b. Penggantian baru unit pompa.

IV. SUMUR
a. Pencucian Sumur

V. RUMAH POMPA
a. PEKERJAAN BONGKARAN
1 Bongkaran penutup atap
2 Bongkaran kuda-kuda,gording dan pintu/kosen
3 Bongkaran pasangan batu merah

b. PEKERJAAN TANAH
1 Galian tanah untuk timbunan
2 Timbunan tanah bekas galian dipadatkan
3 Pasir urug bawah pondasi / lantai
c. PEKERJAAN PASANGAN
1 Pasangan pondasi batu kosong
2 Pasangan batu belah 1 Pc : 4 Ps
3 Pasangan batu merah 1 Pc : 4 Ps
4 Plesteran 1 Pc : 3 Ps, tebal 15 mm
5 Pekerjaan Acian
6 Beton tulang 1 Pc : 2 Ps : 3 Kr, u/ sloof, kolom, ring balk dan pondasi
7 Beton tumbuk 1Pc : 2 Ps : 3 Kr, u/ lantai rumah pompa

d. PEKERJAAN KAYU / ATAP


1 Rangka gording & kuda - kuda kamper dan Pemasangan
2 Pasang kusen pintu kayu kamper
3 Pasang daun pintu panil kayu kamper
4 Pengad. dan Pasang Seng gelombang (900 x 2400 x 0,2) mm dg
5 Pasang lisplank ukr. 3 x 20 cm kayu kamper
6 Tralis, bhn besi siku, besi beton & plat strip
7 Besi Siku L.55.55.5, dg angker, Baut + Ring u/ Pengikat Gording
8 Besi Siku L.55.55.5, Baut + Ring u/ Pengikat Gording

e. PEKERJAAN PENGECATAN
1 Pengikisan/Pengerokan Permukaan Cat Lama
2 Pengecatan tembok dinding
3 Pengecatan kayu ( pintu, lisplank, gording )

f. PEKERJAAN LAIN-LAIN
1 Pengadaan & pemasangan Kunci slot 2 putaran
2 Pengadaan & Pemasangan Engsel pintu
3 Pengadaan & Pemasangan Grendel 25 cm
4 Hag pengait daun pintu dg fisher

PEKERJAAN RUMAH POMPA

VI. PAGAR RUMAH POMPA


1 Galian tanah
2 Timbunan tanah bekas galian dipadatkan
3 Pasir urug
4 Urugan sirtu
5 Beton tulang 1 Pc : 2 Ps : 3 Kr, u/ sloof & kolom
6 Pasangan batu belah 1 Pc : 4 Ps
7 Pasangan batu bata merah 1 Pc : 4 Ps
8 Plesteran 1 Pc : 3 Ps, tebal 15 mm
9 Pengadaan dan pemasangan tiang pagar, bhn besi siku L 55.55.5 m'
10 Pengadaan dan pemasangan kawat duri
11 Pintu kawat harmonika
12 Pengecatan tembok
13 Pengecatan besi (pintu dan tiang pagar)
14 Kunci gembok 5 cm silver kualitas baik (per lokasi 2 bh)
15 Perkerasan jalan masuk

PEKERJAAN PAGAR RUMAH POMPA

VII. PERPIPAAN JIAT

Bangunan ukur
Box
Riser pipe
Stand pipe
Air valve
Saluran

a. PEKERJAAN PERSIAPAN
1 Stake out trase saluran/Infrastruktur (baru) di lapangan

b. PEKERJAAN TANAH
1 Galian tanah biasa
2 Timbunan tanah dari bekas galian dipadatkan
3 Pasir urug pelindung saluran pipa

c. PEKERJAAN PASANGAN DAN BETON


1 Pasangan pondasi batu belah 1 Pc : 4 Ps
2 Pasangan batu bata merah 1 Pc : 4 Ps
3 Plesteran 1 Pc : 3 Ps, tebal 15 mm
4 Beton tumbuk campuran 1Pc : 2 Ps : 3 Kr

d. PEKERJAAN SALURAN PIPA PVC & ACCESSORIES


1 Pemasangan Alfalfa Valve dia 8".
2 Kunci stang pembuka - penutup Alfalfa Valve
3 Riser Pipe, GIP 4" - 6', Flend di las, hose, packing, bolt w/ nut + ri
4 Stand Pipe, bahan GIP 4"-6 m, Flange, packing, 8 baut
5 Crossing, bhn GIP 6"-6 m, dg 2 bh Flange di las, packing, 8 baut
6 Crossing, bhn GIP 6"-3 m, dg 2 bh Flange di las, packing, 8 baut
7 Pengadaan, Pemasangan, Penyambungan Pipa PVC :
Pipa PVC Moof 6 m' S-12,5 Dia 8''
Pipa PVC Moof 6 m' S-12,5 Dia 6''
8 Pengadaan bahan / accessories
- L Joint PVC dia 6 "
- T Joint PVC dia 8 "
- T Joint PVC dia 6 "
- Elbow PVC dia 6 "
- Reduser PVC dia 8 " - 6 "
- Flange Adaptor PVC dia 6"
- Flange Adaptor PVC dia 8"
- GIP dia. 6"-1,5 m' dg Flange di Las, packing + bolt w/ nut + ring
- Alfalfa Valve dia 8 " dg Packing, Baut + Ring
- Outlet PVC 8" - 35 cm dg Dop, rantai, pegangan + 2 screw
- Air valve dia 1" dg keranjang + gembok
- Alat Ukur Thomson, bahan besi siku L 50.50.4. dg angker
- Pengadaan dan pemasangan Peil Schaale Marmer 30 cm.

PEKERJAAN PERPIPAAN

TOTAL
RENCANA ANGGARAN BIAYA

KODE HARGA SATUAN


SAT. VOLUME JML.HARGA (Rp)
ANALISA (Rp)

3 4 5 6 7

m² 1.1.4.b.(a) 789,669.12 -
Ls 3,575,000.00 -
Jumlah Harga Pekerjaan -

Ls P-AT-09 9,897,475.00 -
Ls P-AT-11 155,038,802.50 -
Jumlah Harga Pekerjaan -

Ls P-AT-12 5,969,247.50 -
Ls P-AT-13.b 46,941,574.00 -
Jumlah Harga Pekerjaan -

Jumlah Harga Pekerjaan -

m² 1.1.h (a) (a) - 66,291.75 -


m³ 1.1.h (a) (b) - 198,875.25 -
m³ 1.1.h (a) - 82,817.60 -
Jumlah Harga Pekerjaan -
-

m³ 1.7.7.1.1.a (a) - 74,644.51 -


m³ 1.7.14.a (a) - 168,945.35 -
m³ 1.7.14.e (a) - 309,362.88 -
Jumlah Harga Pekerjaan -

m³ P.05 - 633,178.50 -
m³ 2.1.2.a.1.b.(a) - 1,110,196.20 -
m³ P.02.c.2) - 1,278,912.70 -
m² 3.2.2.2.11.(a) - 45,479.28 -
m² 3.2.2.2.35.(a) - 34,224.00 -
m3 2.2.6.1.c. - 15,983,584.47 -
m³ 2.2.1.2.d.(a) - 1,329,663.59 -
Jumlah Harga Pekerjaan -

m3 K.01.a - 22,016,609.13 -
m3 K.02.a - 18,450,541.86 -
m2 K.02.b - 1,099,477.05 -
m2 K.03.a - 115,141.45 -
m' K.02.c - 513,589.89 -
m2 A.8.4.1.21 - 1,440,372.47 -
set - 80,000 -
set - 70,000 -
Jumlah Harga Pekerjaan -

m2 P.8.01 - 20,646.18 -
m2 P.8.02 - 64,893.47
m2 P.8.03 - 76,333.09 -
Jumlah Harga Pekerjaan -

bh K.04.a - 133,096.40 -
bh K.04.b - 101,547.30 -
bh K.04.c - 104,997.30 -
bh K.04.d - 49,797.30 -
Jumlah Harga Pekerjaan -

JUMLAH -

m3 1.7.7.1.1.a (a) - 74,645 -


m3 1.7.14.a (a) - 168,945 -
m3 1.7.14.e (a) - 309,363 -
m3 A.2.3.1.14 - 294,504.08 -
m3 2.2.6.1.c. - 15,983,584 -
m3 2.1.2.a.1.b.(a) - 1,110,196 -
m3 P.02.c.2) - 1,278,913 -
m2 3.2.2.2.11.(a) - 45,479 -
m' 11.5 - 215,211.00 -
m' 11.6 - 125,281.00 -
m2 - 1,250,000 -
m2 P.8.02 - 64,893.47 -
m2 P.8.03 - 76,333.09 -
bh SNI. 6.20 - 119,000 -
m3 A.2.3.1.14 - 294,504 -

JUMLAH -

-
-
-
-
-
m -

m 1.7.4.a.(a) 5,794 -

Jumlah Harga Pekerjaan -

m3 1.7.7.1.1.a (a) 74,645 -


m3 1.7.14.a (a) - 168,945 -
m3 1.7.14.e (a) - 309,363 -
Jumlah Harga Pekerjaan -

m3 2.1.2.a.1.b.(a) 1,110,196 -
m3 P.02.c.2) 1,278,913 -
m2 3.2.2.2.11.(a) 45,479 -
m3 2.2.1.2.d.(a) - 1,329,664 -
Jumlah Harga Pekerjaan -

m' 11.4 537,567.50 -


bh - 209,000 -
set - 2,310,000 -
set - 2,200,000 -
set - 3,190,000 -
set - 2,200,000 -

Btg 2,145,450
Btg 1,314,100

bh - 350,000 -
bh - 120,000 -
bh - 251,000 -
bh - 165,000 -
bh - 254,500 -
bh - 242,000 -
bh - 280,000 -
bh - 550,000 -
bh 750,000 -
set 320,000 -
bh - 360,000 -
bh - 236,000 -
bh - 240,000 -
Jumlah Harga Pekerjaan -

JUMLAH -

-
a. Pencucian Sumur

b. Perbaikan Penggerak Pompa (termasuk panel dan spare p


masuk panel dan spare part)
REKAPITULASI
RENCANA ANGGARAN BIAYA
No. Sumur Bor :
Desa/Kelurahan :
Kecamatan :
Kabupaten/Kota :
Provinsi :

No. JENIS PEKERJAAN JUMLAH

I PEKERJAAN PERSIAPAN -
II MESIN PENGGERAK -
III POMPA -
IV SUMUR -
V RUMAH POMPA -
VI PAGAR RUMAH POMPA -
VII PERPIPAAN JIAT -

Jumlah -
PPN 11 % -
Biaya Konstruksi Fisik (BKF) -
JUMLAH PEMBULATAN -

TERBILANG :
KOMPONEN BIAYA KESELAMATAN KONSTRUKSI

HARGA JUMLAH
NO. URAIAN SATUAN KUANTITAS SATUAN SATUAN
(Rp.) (Rp.)

1 Penyiapan RK3K
Pembuatan dokumen Rencana Keselamatan
a Set 1.00 50,000.00 50,000.00
Konstruksi (RKK)
b Pembuatan prosedur dan instruksi kerja Set 1.00 50,000.00 50,000.00

2 Sosialisasi, Promosi dan pelatihan


a Induksi K3 (Safety Induction) Org 5.00 50,000.00 250,000.00

3 Alat Pelindung Diri (APD)


a Topi Pelindung ( Safety Helmet) Bh 5.00 50,000.00 250,000.00
b Pelindung Pernafasan dan Mulut (Masker) Box 5.00 25,000.00 125,000.00
c Sarung Tangan (Safety Gloves) Psg 5.00 25,000.00 125,000.00
d Rompi Keselamatan (Safety Vest) Bh 5.00 25,000.00 125,000.00

4 Asuransi dan Perizinan


a Asuransi dan Kesehatan Ls 1.00 250,000.00 250,000.00

5 Personil K3
Ahli K3 Konstruksi dan/atau Petugas
a Ls 1.00 1,000,000.00 1,000,000.00
Keselamatan Konstruksi

6 Fasilitas Sarana, Prasarana dan Alat Kesehatan


a Peralatan P3K (Kotak P3K, tandu, obat luka, pe OB 1.00 250,000.00 250,000.00

7 Rambu-Rambu yang diperlukan


a Rambu Peringatan Bh 1.00 50,000.00 50,000.00

8 Konsultasi dengan Ahli Terkait Keselamatan Konstruksi


a Ahli Struktur OJ 1.00 1,000,000.00 1,000,000.00

9 Kegiatan dan peralatan terkait dengan pengendalian resiko Keselamatan Konstruksi


a Bendera K3 Ls 1.00 50,000.00 50,000.00

3,575,000.00
ANALISA HARGA SATUAN

KODE ANALISA : 1.7.4.a.(a)


JENIS PEKERJAAN : Stake out trase saluran/Infrastruktur (baru) di lapangan
SATUAN PEMBAYARAN : m2
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.0096 100,800.00 967.68
2 Tukang L.02 OH 0.0048 119,700.00 574.56
3 Kepala Tukang L.03 OH 0.0048 138,600.00 665.28
4 Mandor L.04 OH 0.0096 144,900.00 1,391.04
Jumlah Tenaga Kerja 3,598.56
B Bahan

Jumlah Harga Bahan -


C Peralatan
1 Waterpass E.20 Hari 0.0096 100,000.00 960.00
2 Theodolith E.21 Hari 0.0048 100,000.00 480.00
Jumlah Harga Alat 1,440.00
D Jumlah (A+B+C) 5,038.56
E Overhead + Profit 15.00% 755.78
F Harga Satuan Pekerjaan (D+E) per-m2 5,794.34
ANALISA HARGA SATUAN

KODE ANALISA : 1.1.4.b.(a)


JENIS PEKERJAAN : Papan nama pekerjaan multiflex 10 mm, frame aluminium siku
dan tiang kayu 5/7, printing banner plastik
SATUAN PEMBAYARAN : m2
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.7500 100,800.00 75,600.00
2 Tukang L.02 OH 0.7500 119,700.00 89,775.00
3 Kepala Tukang L.03 OH 0.1000 138,600.00 13,860.00
4 Mandor L.04 OH 0.0750 144,900.00 10,867.50
Jumlah Tenaga Kerja 190,102.50
B Bahan
1 Multiflex 9,0 mm M.38.d lbr 0.1800 195,600.00 35,208.00
2 Tiang kayu 5/7 cm kelas II M.33.a m3 0.0210 13,562,300.00 284,808.30
3 Frame allumunium L.10.10.1 M.107 kg 0.1000 125,000.00 12,500.00
4 Banner plastik printed tahan air M.112.b m2 0.4800 20,000.00 9,600.00
5 Paku M.30 kg 1.2500 26,000.00 32,500.00
6 Cat Kayu M.73 kg 1.5000 81,300.00 121,950.00
Jumlah Harga Bahan 496,566.30
C Peralatan

Jumlah Harga Alat -


D Jumlah (A+B+C) 686,668.80
E Overhead + Profit 15.00% 103,000.32
F Harga Satuan Pekerjaan (D+E) per-bh 789,669.12
ANALISA HARGA SATUAN

KODE ANALISA : 1.1.d.(c)


JENIS PEKERJAAN : Pengukuran dan pemasangan 1 m' Bouwplank
SATUAN PEMBAYARAN : m'
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 100,800.00 10,080.00
2 Tukang Kayu L.02.a OH 0.1000 138,600.00 13,860.00
3 Kepala Tukang L.03 OH 0.0100 138,600.00 1,386.00
4 Mandor L.04 OH 0.0050 144,900.00 724.50
Jumlah Tenaga Kerja 26,050.50
B Bahan
1 Multiflex 9,0 mm M.38.d lbr 0.0120 195,600.00 2,347.20
2 Multiflex 9,0 mm M.38.d lbr 0.0200 195,600.00 3,912.00
3 Multiflex 9,0 mm M.38.d lbr 0.0070 195,600.00 1,369.20
Jumlah Harga Bahan 2,347.20
C Peralatan

Jumlah Harga Alat -


D Jumlah (A+B+C) 28,397.70
E Overhead + Profit 15.00% 4,259.66
F Harga Satuan Pekerjaan (D+E) per-m3 32,657.36
ANALISA HARGA SATUAN

KODE ANALISA : 1.1.f (c)


JENIS PEKERJAAN : Pembersihan dan Pengupasan Permukaan Tanah (Striping) a.d. Tanaman
SATUAN PEMBAYARAN : m2
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 100,800.00 10,080.00
4 Mandor L.04 OH 0.0050 144,900.00 724.50
Jumlah Tenaga Kerja 10,804.50
B Bahan

Jumlah Harga Bahan -


C Peralatan

Jumlah Harga Alat -


D Jumlah (A+B+C) 10,804.50
E Overhead + Profit 15.00% 1,620.68
F Harga Satuan Pekerjaan (D+E) per-m2 12,425.18

ANALISA HARGA SATUAN

KODE ANALISA : B.29.b


JENIS PEKERJAAN : Pembongkaran Beton dengan Jack Hammer
SATUAN PEMBAYARAN : m3
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.2000 100,800.00 120,960.00
2 Mandor L.04 OH 0.1200 144,900.00 17,388.00
Jumlah Tenaga Kerja 138,348.00
B Bahan
1 BBM Non Subsidi M.60 Ltr 2.5000 17,000.00 42,500.00
Jumlah Harga Bahan 42,500.00
C Peralatan
1 Jack Hammer E.26 Sewa-Hari 0.2500 300,000.00 75,000.00
Jumlah Harga Alat 75,000.00
D Jumlah (A+B+C) 255,848.00
E Overhead + Profit 15.00% 38,377.20
F Harga Satuan Pekerjaan (D+E) per-m3 294,225.20
ANALISA HARGA SATUAN

KODE ANALISA : 1.1.h (a)


JENIS PEKERJAAN : Pembongkaran Dinding Tembok Bata
SATUAN PEMBAYARAN : m3
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.6670 100,800.00 67,233.60
2 Mandor L.04 OH 0.0330 144,900.00 4,781.70
Jumlah Tenaga Kerja 72,015.30
B Bahan

Jumlah Harga Bahan -


C Peralatan

Jumlah Harga Alat -


D Jumlah (A+B+C) 72,015.30
E Overhead + Profit 15.00% 10,802.30
F Harga Satuan Pekerjaan (D+E) per-m3 82,817.60

ANALISA HARGA SATUAN

KODE ANALISA : 1.1.h (a) (a)


JENIS PEKERJAAN : Pembongkaran penutup atap ( + pembuangan )
SATUAN PEMBAYARAN : m2
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.5000 100,800.00 50,400.00
2 Mandor L.04 OH 0.0500 144,900.00 7,245.00
Jumlah Tenaga Kerja 57,645.00
B Bahan

Jumlah Harga Bahan -


C Peralatan

Jumlah Harga Alat -


D Jumlah (A+B+C) 57,645.00
E Overhead + Profit 15.00% 8,646.75
F Harga Satuan Pekerjaan (D+E) per-m3 66,291.75
ANALISA HARGA SATUAN

KODE ANALISA : 1.1.h (a) (b)


JENIS PEKERJAAN : Pembongkaran konstruksi kuda-kuda, gording dan kusen ( + pembuanga
SATUAN PEMBAYARAN : m3
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.5000 100,800.00 151,200.00
2 Mandor L.04 OH 0.1500 144,900.00 21,735.00
Jumlah Tenaga Kerja 172,935.00
B Bahan

Jumlah Harga Bahan -


C Peralatan

Jumlah Harga Alat -


D Jumlah (A+B+C) 172,935.00
E Overhead + Profit 15.00% 25,940.25
F Harga Satuan Pekerjaan (D+E) per-m3 198,875.25

ANALISA HARGA SATUAN

KODE ANALISA : 1.7.7.1.1.a (a)


JENIS PEKERJAAN : Penggalian 1 m3 tanah biasa sedalam s/d 1 m untuk volume 200 m3 s/d 20
SATUAN PEMBAYARAN : m3
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.5630 100,800.00 56,750.40
2 Mandor L.04 OH 0.0563 144,900.00 8,157.87
Jumlah Tenaga Kerja 64,908.27
B Bahan

Jumlah Harga Bahan -


C Peralatan

Jumlah Harga Alat


D Jumlah (A+B+C) 64,908.27
E Overhead + Profit 15.00% 9,736.24
F Harga Satuan Pekerjaan (D+E) per-m3 74,644.51
ANALISA HARGA SATUAN

KODE ANALISA : 1.7.14.a (a)


JENIS PEKERJAAN : Timbunan atau urugan kembali tanah biasa/tanah liat berpasir
SATUAN PEMBAYARAN : m3
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 100,800.00 10,080.00
2 Mandor L.04 OH 0.0100 144,900.00 1,449.00
Jumlah Tenaga Kerja 11,529.00
B Bahan
1 Tanah biasa.tanah liat berpasir M.04 m3 1.4000 96,700.00 135,380.00
Jumlah Harga Bahan 135,380.00
C Peralatan

Jumlah Harga Alat -


D Jumlah (A+B+C) 146,909.00
E Overhead + Profit 15.00% 22,036.35
F Harga Satuan Pekerjaan (D+E) per-m3 168,945.35

ANALISA HARGA SATUAN

KODE ANALISA : 1.7.14.e (a)


JENIS PEKERJAAN : Timbunan pasir
SATUAN PEMBAYARAN : m3
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.3180 100,800.00 32,054.40
2 Mandor L.04 OH 0.0320 144,900.00 4,636.80
Jumlah tenaga Kerja 36,691.20
B Bahan
1 Pasir urug M.03 m3 1.2000 193,600.00 232,320.00
Jumlah Harga Bahan 232,320.00
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 269,011.20
E Overhead + Profit 15.00% 40,351.68
F Harga Satuan Pekerjaan (D+E) per-m3 309,362.88
ANALISA HARGA SATUAN

KODE ANALISA : 2.1.2.a.1.b.(a)


JENIS PEKERJAAN : Mortar tipe N (setara campuran 1 PC: 4 PP), fc=5,2 Mpa
menggunakan molen untuk ketinggian 0 s.d. 1 m
SATUAN PEMBAYARAN : m3
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) Harga(Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.0000 100,800.00 100,800.00
2 Tukang Batu L.02.b OH 0.5000 119,700.00 59,850.00
3 Mandor L.04 OH 0.1000 144,900.00 14,490.00
Jumlah Tenaga Kerja 175,140.00
B Bahan
1 Batu / batu kali / batu belah M.06.a m3 1.2000 307,100.00 368,520.00
2 Pasir pasang M.01.a m3 0.5200 312,900.00 162,708.00
3 Portland Cement M.15 kg 163.0000 1,500.00 244,500.00
Jumlah Harga Bahan 775,728.00
C Peralatan
1 Molen (Concrete Mixer 0,3 m3) E.29.b Sewa-Hari 0.0726 200,000.00 14,520.00
Jumlah Harga Alat 14,520.00
D Jumlah (A+B+C) 965,388.00
E Overhead + Profit 15.00% 144,808.20
F Harga Satuan Pekerjaan (D+E) per-m3 1,110,196.20
ANALISA HARGA SATUAN

KODE ANALISA : 1.6.1.a.(a)


JENIS PEKERJAAN : Pasangan batu muka
SATUAN PEMBAYARAN : m2
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.2400 100,800.00 24,192.00
2 Tukang Batu L.02.b OH 0.1200 119,700.00 14,364.00
3 Kepala Tukang L.03 OH 0.0120 138,600.00 1,663.20
4 Mandor L.04 OH 0.0240 144,900.00 3,477.60
Jumlah Tenaga Kerja 43,696.80
B Bahan
1 Batu muka M.06.d m2 1.2500 70,900.00 88,625.00
2 Pasir pasang M.01.a m3 0.0250 312,900.00 7,822.50
3 Portland Cement M.15 kg 5.0000 1,500.00 7,500.00
Jumlah Harga Bahan 103,947.50
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 147,644.30
E Overhead + Profit 15.00% 22,146.65
F Harga Satuan Pekerjaan (D+E) per-m2 169,790.95
ANALISA HARGA SATUAN

KODE ANALISA : 3.2.2.1.1.a.(a)


JENIS PEKERJAAN : Siaran dengan mortar tipe M, fc=17,2 Mpa (setara 1PC:2PP)
SATUAN PEMBAYARAN : m2
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(RP) Harga(Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.2000 100,800.00 20,160.00
2 Tukang Batu L.02.b OH 0.2000 119,700.00 23,940.00
3 Kepala Tukang L.03 OH 0.0200 138,600.00 2,772.00
4 Mandor L.04 OH 0.0200 144,900.00 2,898.00
Jumlah Tenaga Kerja 49,770.00
B Bahan
1 Pasir pasang M.01.a m3 0.0060 312,900.00 1,877.40
2 Portland Cement M.15 kg 2.3400 1,500.00 3,510.00
Jumlah Harga Bahan 1,877.40
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 51,647.40
E Overhead + Profit 15.00% 7,747.11
F Harga Satuan Pekerjaan (D+E) per-m2 59,394.51
ANALISA HARGA SATUAN

KODE ANALISA : 3.2.2.2.11.(a)


JENIS PEKERJAAN : Plesteran tebal 1,5 cm dengan mortar tipe S, fc=12,5 Mpa (setara 1PC:3PP
SATUAN PEMBAYARAN : m2
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1300 100,800.00 13,104.00
2 Tukang Batu L.02.b OH 0.1300 119,700.00 15,561.00
3 Kepala Tukang L.03 OH 0.0130 138,600.00 1,801.80
4 Mandor L.04 OH 0.0130 144,900.00 1,883.70
Jumlah Tenaga Kerja 32,350.50
B Bahan
1 Pasir pasang M.01.a m3 0.0230 312,900.00 7,196.70
2 Portland Cement M.15 kg 7.7760 1,500.00 11,664.00
Jumlah Harga Bahan 7,196.70
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 39,547.20
E Overhead + Profit 15.00% 5,932.08
F Harga Satuan Pekerjaan (D+E) per-m2 45,479.28
ANALISA HARGA SATUAN

KODE ANALISA : 3.2.2.2.35.(a)


JENIS PEKERJAAN : Pekerjaan Acian
SATUAN PEMBAYARAN : m2
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 100,800.00 10,080.00
2 Tukang Batu L.02.b OH 0.1000 119,700.00 11,970.00
3 Kepala Tukang L.03 OH 0.0100 138,600.00 1,386.00
4 Mandor L.04 OH 0.0100 144,900.00 1,449.00
Jumlah Tenaga Kerja 24,885.00
B Bahan
1 Portland Cement M.15 kg 3.2500 1,500.00 4,875.00
Jumlah Harga Bahan 4,875.00
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 29,760.00
E Overhead + Profit 15.00% 4,464.00
F Harga Satuan Pekerjaan (D+E) per-m2 34,224.00
ANALISA HARGA SATUAN

KODE ANALISA : 2.2.1.1.a.(a)


JENIS PEKERJAAN : Beton untuk lantai kerja (bedding) Beton fc' = 7,4 s.d. 9,8 MPa
(K-100 s.d. K-125)
SATUAN PEMBAYARAN : m3
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.2000 100,800.00 120,960.00
2 Tukang Batu L.02.b OH 0.2000 119,700.00 23,940.00
3 Kepala Tukang L.03 OH 0.0200 138,600.00 2,772.00
4 Mandor L.04 OH 0.1200 144,900.00 17,388.00
Jumlah Tenaga Kerja 165,060.00
B Bahan
1 Portland Cement M.15 kg 227.00 1,500.00 340,500.00
2 Pasir cor/beton M.02.b Kg 869.00 240.36 208,870.36
3 Kerikil/Koral/Agregat Beton M.12.a Kg 1,000.00 259.26 259,259.26
4 Air M.50 Liter 215.00 100.00 21,500.00
Jumlah Harga Bahan 830,129.62
C Peralatan
1 Molen (Concrete Mixer 0,3 m3) E.29.b Sewa-Hari 0.2380 200,000.00 47,600.00
Jumlah Harga Alat 47,600.00
D Jumlah (A+B+C) 1,042,789.62
E Overhead + Profit 15.00% 156,418.44
F Harga Satuan Pekerjaan (D+E) per-m3 1,199,208.06
ANALISA HARGA SATUAN

KODE ANALISA : 2.2.1.2.a.(a)


JENIS PEKERJAAN : Beton Mutu f'c = 7,4 MPa (K100)
SATUAN PEMBAYARAN : m³
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.0000 100,800.00 100,800.00
2 Tukang Batu L.02.b OH 0.2500 119,700.00 29,925.00
3 Kepala Tukang L.03 OH 0.0250 138,600.00 3,465.00
4 Mandor L.04 OH 0.1000 144,900.00 14,490.00
Jumlah Tenaga Kerja 148,680.00
B Bahan
1 Portland Cement M.15 kg 247.00 1,500.00 370,500.00
2 Pasir cor/beton M.02.b Kg 869.00 240.36 208,870.36
3 Kerikil/Koral/Agregat Beton M.12.a Kg 1,000.00 259.26 259,259.26
4 Air M.50 Liter 215.00 100.00 21,500.00
Jumlah Harga Bahan 860,129.62
C Peralatan
1 Molen (Concrete Mixer 0,3 m3) E.29.b Sewa-Hari 0.2380 200,000.00 47,600.00
Jumlah Harga Alat 47,600.00
D Jumlah (A+B+C) 1,056,409.62
E Overhead + Profit 15.00% 158,461.44
F Harga Satuan Pekerjaan (D+E) per-m3 1,214,871.06
ANALISA HARGA SATUAN

KODE ANALISA : 2.2.1.2.d.(a)


JENIS PEKERJAAN : Beton mutu fc = 14,5 Mpa (K-175) (Menggunakan Molen)
SATUAN PEMBAYARAN : m3
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.0000 100,800.00 100,800.00
2 Tukang Batu L.02.b OH 0.2500 119,700.00 29,925.00
3 Kepala Tukang L.03 OH 0.0250 138,600.00 3,465.00
4 Mandor L.04 OH 0.1000 144,900.00 14,490.00
Jumlah Tenaga Kerja 148,680.00
B Bahan
1 Portland Cement M.15 kg 326.00 1,500.00 489,000.00
2 Pasir cor/beton M.02.b Kg 760.00 240.36 182,671.43
3 Kerikil/Koral/Agregat Beton M.12.a Kg 1,029.00 259.26 266,777.78
4 Air M.50 Liter 215.00 100.00 21,500.00
Jumlah Harga Bahan 959,949.21
C Peralatan
1 Molen (Concrete Mixer 0,3 m3) E.29.b Sewa-Hari 0.2380 200,000.00 47,600.00
Jumlah Harga Alat 47,600.00
D Jumlah (A+B+C) 1,156,229.21
E Overhead + Profit 15.00% 173,434.38
F Harga Satuan Pekerjaan (D+E) per-m3 1,329,663.59
ANALISA HARGA SATUAN

KODE ANALISA : 2.2.1.2.e.(a)


JENIS PEKERJAAN : Beton mutu fc = 19,3 Mpa (K-225) (Menggunakan Molen)
SATUAN PEMBAYARAN : m3
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.0000 100,800.00 100,800.00
2 Tukang Batu L.02.b OH 0.2500 119,700.00 29,925.00
3 Kepala Tukang L.03 OH 0.0250 138,600.00 3,465.00
4 Mandor L.04 OH 0.1000 144,900.00 14,490.00
Jumlah Tenaga Kerja 148,680.00
B Bahan
1 Portland Cement M.15 kg 371.00 1,500.00 556,500.00
2 Pasir cor/beton M.02.b Kg 698.00 240.36 167,769.29
3 Kerikil/Koral/Agregat Beton M.12.a Kg 1,047.00 259.26 271,444.44
4 Air M.50 Liter 215.00 100.00 21,500.00
Jumlah Harga Bahan 1,017,213.73
C Peralatan
1 Molen (Concrete Mixer 0,3 m3) E.29.b Sewa-Hari 0.2380 200,000.00 47,600.00
Jumlah Harga Alat 47,600.00
D Jumlah (A+B+C) 1,213,493.73
E Overhead + Profit 15.00% 182,024.06
F Harga Satuan Pekerjaan (D+E) per-m3 1,395,517.79
ANALISA HARGA SATUAN

KODE ANALISA : P.02.c.2)


JENIS PEKERJAAN : Pasangan Bata Merah Mortar Tipe N (Menggunakan Molen)
SATUAN PEMBAYARAN : m3
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 1.5000 100,800.00 151,200.00
2 Tukang Batu L.02.b OH 1.2000 119,700.00 143,640.00
4 Mandor L.04 OH 0.1500 144,900.00 21,735.00
Jumlah Tenaga Kerja 316,575.00
B Bahan
1 Bata merah M.13 bh 500.00 1,000.00 500,000.00
2 Portland Cement M.15 kg 106.50 1,500.00 159,750.00
3 Pasir pasang M.01.a m3 0.3700 312,900.00 115,773.00
Jumlah Harga Bahan 775,523.00
C Peralatan
1 Molen (Concrete Mixer 0,3 m3) E.29.b Sewa-Hari 0.1000 200,000.00 20,000.00
Jumlah Harga Alat 20,000.00
D Jumlah (A+B+C) 1,112,098.00
E Overhead + Profit 15.00% 166,814.70
F Harga Satuan Pekerjaan (D+E) per-m3 1,278,912.70
ANALISA HARGA SATUAN

KODE ANALISA : 2.2.6.1.a.(a)


JENIS PEKERJAAN : Penulangan pelat untuk besi beton Dia < 12 mm, cara manual
SATUAN PEMBAYARAN : kg
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.7000 100,800.00 70,560.00
2 Tukang Besi L.02.c OH 0.7000 119,700.00 83,790.00
3 Kepala Tukang L.03 OH 0.0700 138,600.00 9,702.00
4 Mandor L.04 OH 0.0700 144,900.00 10,143.00
Jumlah tenaga Kerja 174,195.00
B Bahan
1 Besi Beton (polos/ulir) M.20 kg 105.00 13,600.00 1,428,000.00
2 Kawat beton/bendrat M.28 Kg 1.50 26,000.00 39,000.00
Jumlah Harga Bahan 1,467,000.00
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 1,641,195.00
E Overhead + Profit 15.00% 246,179.25
F Harga Satuan Pekerjaan (D+E) Per-100kg 1,887,374.25
G Harga Satuan Pekerjaan (D+E) per-kg 18,873.74
ANALISA HARGA SATUAN

KODE ANALISA : B.11.b


JENIS PEKERJAAN : Bekisting lantai beton biasa dengan multiflex 12 atau 18 mm (TP)
Bahan dipergunakan berulang kali
SATUAN PEMBAYARAN : m2
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.1000 100,800.00 10,080.00
2 Tukang Kayu L.02.a OH 0.0100 138,600.00 1,386.00
3 Kepala Tukang L.03 OH 0.0100 138,600.00 1,386.00
4 Mandor L.04 OH 0.0200 144,900.00 2,898.00
Jumlah Tenaga Kerja 15,750.00
B BAHAN
1 Multiflex 18 mm M.38.d.a lbr 0.1280 308,000.00 39,424.00
2 Kaso 5/7 cm M.33.d m3 0.0050 10,174,430.00 50,872.15
3 Paku M.30 kg 0.2200 26,000.00 5,720.00
4 Minyak bekisting M.65 Ltr 0.2000 12,400.00 2,480.00
Jumlah Harga Bahan 98,496.15
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 114,246.15
E Overhead + Profit 15.00% 17,136.92
F Harga Satuan Pekerjaan (D+E) per-m2 131,383.07
ANALISA HARGA SATUAN

KODE ANALISA : D.01.a


JENIS PEKERJAAN : Kistdam pasir/tanah di bungkus karung plastik bagor 43x65 cm
SATUAN PEMBAYARAN : bh
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.0400 100,800.00 4,032.00
2 Mandor L.04 OH 0.0040 144,900.00 579.60
Jumlah Tenaga Kerja 4,611.60
B Bahan
1 Karung plastik / bagor M.100 bh 1.0000 5,000.00 5,000.00
2 Tali pengikat/Tambang Nylon M.101 m' 2.0000 1,000.00 2,000.00
3 Pasir pasang M.01.a m3 0.0120 312,900.00 3,754.80
Jumlah Harga Bahan 10,754.80
C Peralatan
Jumlah Harga Alat -
D Jumlah (A+B+C) 15,366.40
E Overhead + Profit 15.00% 2,304.96
F Harga Satuan Pekerjaan (D+E) per-bh 17,671.36
ANALISA HARGA SATUAN

KODE ANALISA : A.4.2.1.1.


JENIS PEKERJAAN : Pasang besi profil
SATUAN PEMBAYARAN : kg
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A TENAGA
1 Pekerja L.01 OH 0.0600 100,800.00 6,048.00
2 Tukang Las L.02.d OH 0.0600 143,400.00 8,604.00
3 Kepala Tukang L.03 OH 0.0060 138,600.00 831.60
4 Mandor L.04 OH 0.0030 144,900.00 434.70
Jumlah Tenaga Kerja 15,918.30
B Bahan
1 Besi Profil M.25 kg 1.1500 24,000.00 27,600.00
Jumlah Harga Bahan 27,600.00
C Peralatan
1 Mesin Las Listrik 250 A E.17 Hari 0.0060 350,000.00 2,100.00
Jumlah Harga Alat 2,100.00
D Jumlah (A+B+C) 43,518.30
E Overhead + Profit 15.00% 6,527.75
F Harga Satuan Pekerjaan (D+E) per-bh 50,046.05
ANALISA HARGA SATUAN

KODE ANALISA : P.09.c


JENIS PEKERJAAN : Peilskaal/Mistar duga muka air
SATUAN PEMBAYARAN : m1
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga
1 Pekerja L.01 OH 0.2500 100,800.00 25,200.00
2 Tukang L.02 OH 0.0250 119,700.00 2,992.50
4 Ahli Madya (Sipil/Hidrologi) L.08 OH 0.0250 250,000.00 6,250.00
Jumlah Tenaga Kerja 34,442.50
B Bahan
1 Mistar Ukur Aluminium, Lebar = 8-15 cm M.103 m' 1.00 75,000.00 75,000.00
2 Pas. Bata Merah 1pc:4ps m3 0.09 1,278,912.70 115,102.14
3 Batang Skoor L.40.40.4 M.104 kg 5.50 20,000.00 110,000.00
4 Pelat Strip/3x30x300 mm M.105 kg 0.50 20,000.00 10,000.00
5 Dynabolt/raamset Φ 8 mm, L = 4-5 cm M.106 bh 4.00 2,000.00 8,000.00
Jumlah Harga Bahan 318,102.14
C Peralatan
1 Alat Bantu Ls 1.00 10,000.00 10,000.00
Jumlah Harga Alat 10,000.00
D Jumlah (A+B+C) 362,544.64
E Overhead + Profit 15.00% 54,381.70
F Harga Satuan Pekerjaan (D+E) per-m' 416,926.34
ANALISA HARGA SATUAN

KODE ANALISA : 3.3.10.(c)


JENIS PEKERJAAN : Pengecatan 1 m2 Tembok Baru (1 Lapis Plamuur, 1 Lapis Cat
Dasar, 2 Lapis Cat Penutup)
SATUAN PEMBAYARAN : m²
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. TENAGA
1 Pekerja L.01 OH 0.0200 100,800.00 2,016.00
2 Tukang Cat L.02.e OH 0.0630 119,700.00 7,541.10
3 Kepala Tukang L.03 OH 0.0063 138,600.00 873.18
4 Mandor L.04 OH 0.0030 144,900.00 434.70
JUMLAH HARGA TENAGA 10,864.98
B BAHAN
1 Plamir M.70 kg 0.100 35,000.00 3,500.00
2 Cat Dasar M.71 kg 0.100 50,000.00 5,000.00
3 Cat Dinding M.72 kg 0.260 157,500.00 40,950.00
JUMLAH HARGA BAHAN 49,450.00
C PERALATAN

JUMLAH HARGA PERALATAN -

D Jumlah (A+B+C) 60,314.98


E Overhead + Profit 15.00% 9,047.25
F Harga Satuan Pekerjaan (D+E) per-m' 69,362.23
ANALISA HARGA SATUAN

KODE ANALISA : A.4.7.1.16.1


JENIS PEKERJAAN : Pengecatan 1 m2 Permukaan Baja
SATUAN PEMBAYARAN : m²
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. TENAGA
1 Pekerja L.01 OH 0.0200 100,800.00 2,016.00
2 Tukang Cat L.02.e OH 0.0630 119,700.00 7,541.10
3 Kepala Tukang L.03 OH 0.0063 138,600.00 873.18
4 Mandor L.04 OH 0.0030 144,900.00 434.70
JUMLAH HARGA TENAGA 10,864.98
B BAHAN
1 Cat Besi M.74 kg 0.3600 81,300.00 29,268.00
JUMLAH HARGA BAHAN 29,268.00
C PERALATAN

JUMLAH HARGA PERALATAN -

D Jumlah (A+B+C) 40,132.98


E Overhead + Profit 15.00% 6,019.95
F Harga Satuan Pekerjaan (D+E) per-m' 46,152.93
ANALISA HARGA SATUAN

KODE ANALISA : 4.1.33.(c)


JENIS PEKERJAAN : Pemasangan 1 m' pipa GIP Ø 2"
SATUAN PEMBAYARAN : m'
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. TENAGA
1 Pekerja L.01 OH 0.345 100,800.00 34,776.00
2 Tukang Pipa L.02.f OH 0.172 143,400.00 24,664.80
3 Kepala Tukang L.03 OH - 138,600.00 -
4 Mandor L.04 OH 0.034 144,900.00 4,926.60
JUMLAH HARGA TENAGA 64,367.40
B BAHAN
1 Pipa GIP Ø 2 " M.80.a m1 1.000 116,900.00 116,900.00
JUMLAH HARGA BAHAN 116,900.00
C PERALATAN

JUMLAH HARGA PERALATAN -

D Jumlah (A+B+C) 181,267.40


E Overhead + Profit 15.00% 27,190.11
F Harga Satuan Pekerjaan (D+E) per-m' 208,457.51
ANALISA HARGA SATUAN

KODE ANALISA : 4.1.33.(c) (a)


JENIS PEKERJAAN : Pemasangan 1 m' pipa GIP Ø 3"
SATUAN PEMBAYARAN : m'
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. TENAGA
1 Pekerja L.01 OH 0.345 100,800.00 34,776.00
2 Tukang Pipa L.02.f OH 0.172 143,400.00 24,664.80
3 Kepala Tukang L.03 OH - 138,600.00 -
4 Mandor L.04 OH 0.034 144,900.00 4,926.60
JUMLAH HARGA TENAGA 64,367.40
B BAHAN
1 Pipa GIP Ø 3 " M.80.b m1 1.000 185,000.00 185,000.00
JUMLAH HARGA BAHAN 185,000.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D Jumlah (A+B+C) 249,367.40


E Overhead + Profit 15.00% 37,405.11
F Harga Satuan Pekerjaan (D+E) per-m' 286,772.51
ANALISA HARGA SATUAN

KODE ANALISA : 4.1.34.(c)


JENIS PEKERJAAN : Pemasangan 1 m' pipa GIP Ø 4"
SATUAN PEMBAYARAN : m'
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. TENAGA
1 Pekerja L.01 OH 0.400 100,800.00 40,320.00
2 Tukang Pipa L.02.f OH 0.200 143,400.00 28,680.00
3 Kepala Tukang L.03 OH 138,600.00 -
4 Mandor L.04 OH 0.040 144,900.00 5,796.00
JUMLAH HARGA TENAGA 74,796.00
B BAHAN
1 Pipa GIP Ø 4 " M.80.c m1 1.000 270,000.00 270,000.00
JUMLAH HARGA BAHAN 270,000.00

C PERALATAN

JUMLAH HARGA PERALATAN -

D Jumlah (A+B+C) 344,796.00


E Overhead + Profit 15.00% 51,719.40
F Harga Satuan Pekerjaan (D+E) per-m' 396,515.40
ANALISA HARGA SATUAN

KODE ANALISA : 4.1.36.(c)


JENIS PEKERJAAN : Pemasangan 1 m' pipa GIP Ø 6"
SATUAN PEMBAYARAN : m'
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. TENAGA
1 Pekerja L.01 OH 0.506 100,800.00 51,004.80
2 Tukang Pipa L.02.f OH 0.253 143,400.00 36,280.20
3 Kepala Tukang L.03 OH 138,600.00 -
4 Mandor L.04 OH 0.051 144,900.00 7,389.90
JUMLAH HARGA TENAGA 94,674.90
B BAHAN
1 Pipa GIP Ø 6 " M.80.d m1 1.000 470,000.00 470,000.00
JUMLAH HARGA BAHAN 470,000.00
C PERALATAN

JUMLAH HARGA PERALATAN -

D Jumlah (A+B+C) 564,674.90


E Overhead + Profit 15.00% 84,701.24
F Harga Satuan Pekerjaan (D+E) per-m' 649,376.14
ANALISA HARGA SATUAN

KODE ANALISA : P.05


JENIS PEKERJAAN : Pasangan batu kosong manual
SATUAN PEMBAYARAN : m3
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
(Rp) (Rp)
(1) (2) (1) (2) (3) (4) (5)
A. Tenaga Kerja
1. Pekerja L.01 OH 1.0000 100,800.00 100,800
2. Tukang batu L.02.b OH 0.5000 119,700.00 59,850
3. Kepala tukang L.03 OH 0.0500 138,600.00 6,930
4. Mandor L.04 OH 0.1000 144,900.00 14,490
Jumlah Harga Tenaga Kerja 182,070
B. Bahan
1. Batu belah ( kali / gunung ) M.06.a m3 1.2000 307,100.00 368,520
Jumlah Harga Bahan 368,520
C. Peralatan
Jumlah Harga Peralatan -
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 550,590
E. Overhead dan Profit (Contoh 15%) 15.00% x D 82,589
F. Harga Satuan Pekerjaan per m³ (D+E) 633,179
DAFTAR UPAH

KODE URAIAN SATUAN HARGA

L.01 Pekerja OH 100,800.00


L.02 Tukang OH 119,700.00
L.02.a Tukang Kayu OH 138,600.00
L.02.b Tukang Batu OH 119,700.00
L.02.c Tukang Besi OH 119,700.00
L.02.d Tukang Las OH 143,400.00
L.02.e Tukang Cat OH 119,700.00
L.02.f Tukang Pipa OH 143,400.00
L.03 Kepala Tukang OH 138,600.00
L.04 Mandor OH 144,900.00
L.05 Juru Ukur OH 119,700.00
L.06 Pembantu juru ukur OH 100,800.00
L.08 Ahli Madya (Sipil/Hidrologi) OH 250,000.00
DAFTAR HARGA BAHAN

KODE NAMA BAHAN SATUAN HARGA

M.01.a Pasir pasang m3 312,900.00


M.01.b Pasir pasang Kg 223.50
M.02.a Pasir cor/beton m3 336,500.00
M.02.b Pasir cor/beton Kg 240.36
M.03 Pasir urug m3 193,600.00
M.04 Tanah biasa.tanah liat berpasir m3 96,700.00
M.06.a Batu / batu kali / batu belah m3 307,100.00
M.06.d Batu muka m2 70,900.00
M.12 Kerikil/Koral/Agregat Beton m3 350,000.00
M.12.a Kerikil/Koral/Agregat Beton Kg 259.26
M.13 Bata merah bh 1,000.00
M.15 Portland Cement kg 1,500.00
M.16 Sirtu m³ 189,390.00
M.20 Besi Beton (polos/ulir) kg 13,600.00
M.25 Besi Profil kg 24,000.00
M.27 Besi pengaku kg 21,200.00
M.28 Kawat beton/bendrat Kg 26,000.00
M.29 Kawat las listrik kg 48,250.00
M.29.a Kawat Duri m' 7,200.00
M.30 Paku kg 26,000.00
M.30.a Lem kayu kg 40,100.00
M.31.a Kayu Perancah (balok) Biasa m³ 3,823,000.00
M.31.b Kayu Perancah (papan) Biasa m³ 3,823,000.00
M.31.c Kayu Kamper m³ 13,562,300.00
M.31.d Kayu kelas III m³ 10,174,430.00
M.33.a Tiang kayu 5/7 cm kelas II m3 13,562,300.00
M.33.d Kaso 5/7 cm m3 10,174,430.00
M.34 Dolken kayu Ø 8 - 10 /400 cm btg 189,300.00
M.38.d.a Multiflex 18 mm lbr 308,000.00
M.38.d Multiflex 9,0 mm lbr 195,600.00
M.39.a Seng Gelombang Lmbr 110,700.00
M.50 Air Liter 100.00
M.60 BBM Non Subsidi Ltr 17,000.00
M.65 Minyak bekisting Ltr 12,400.00
M.69 Thineer kg 41,970.00
M.70 Plamir kg 35,000.00
M.71 Cat Dasar kg 50,000.00
M.72 Cat Dinding kg 157,500.00
M.73 Cat Kayu kg 81,300.00
M.74 Cat Besi kg 81,300.00
M.75 Soda Api Ltr 47,970.00
M.80.a Pipa GIP Ø 2 " m1 116,900.00
M.80.b Pipa GIP Ø 3 " m1 185,000.00
M.80.c Pipa GIP Ø 4 " m1 270,000.00
M.80.d Pipa GIP Ø 6 " m1 470,000.00
M.81.a Pipa PVC tipe AW Ø 2 " m1 27,000.00
M.81.b Pipa PVC tipe AW Ø 3 " m1 40,200.00
M.81.c Pipa PVC tipe AW Ø 4 " m1 60,000.00
M.81.d Pipa PVC tipe AW Ø 6 " m1 170,000.00
M.90 Lem PVC kg 47,500.00
M.91 Kuas/Kwas bh 20,000.00
M.92 Sealtape/TBA bh 3,500.00
M.93 Ampelas Lmbr 6,110.00
M.94 Kunci Slot bh 86,000.00
M.95 Engsel Pintu bh 66,000.00
M.96 Grendel bh 69,000.00
M.97 Kait Angin bh 21,000.00
M.100 Karung plastik / bagor bh 5,000.00
M.101 Tali pengikat/Tambang Nylon m' 1,000.00
M.102 Pintu Air (B=0,8 m; H=0,8 m; H=1,2 m) unit 20,000,000.00
M.103 Mistar Ukur Aluminium, Lebar = 8-15 cm m' 75,000.00
M.104 Batang Skoor L.40.40.4 kg 20,000.00
M.105 Pelat Strip/3x30x300 mm kg 20,000.00
M.106 Dynabolt/raamset Φ 8 mm, L = 4-5 cm bh 2,000.00
M.107 Frame allumunium L.10.10.1 kg 125,000.00
M.112.b Banner plastik printed tahan air m2 20,000.00
M.133.b Perlengkapan perpipaan % 250,000.00
DAFTAR HARGA PERALATAN

KODE. NAMA ALAT SATUAN HARGA

E.16a Bor besi Sewa-Hari 100,000.00

E.17 Mesin Las Listrik 250 A Hari 350,000.00


E.18 Tackle/Tripod tinggi 5 m Sewa-Hari 250,000.00
E.19 Pompa air Sewa-Hari 150,000.00
E.20 Waterpass Hari 100,000.00
E.21 Theodolith Hari 100,000.00
E.26 Jack Hammer Sewa-Hari 300,000.00
E.29.b Molen (Concrete Mixer 0,3 m3) Sewa-Hari 200,000.00
ANALISA HARGA SATUAN

KODE ANALISA : P-AT-08


JENIS PEKERJAAN : Perbaikan mesin penggerak (Non PU)
SATUAN PEMBAYARAN : Unit

No Uraian Kode Satuan Koefisien


1 2 3 4 5
A Tenaga
1 Teknisi Bengkel L.02 OH 5.0000
2 Pekerja L.01 OH 10.0000
Jumlah Tenaga Kerja
B Bahan
1 Spare Part unit 1.0000
Jumlah Harga Bahan
C Peralatan
1 Tackle sewa-hari 5.0000
2 Handle Crane 2 T sewa-hari 5.0000
3 Peralatan Bengkel LS 5.0000
Jumlah Harga Alat
D Jumlah harga tenaga, bahan dan peralatan (A+B+C)
E Overhead + profit (Contoh 15%)
F Harga Satuan Pekerjaan per - unit JIAT(D+E)

ANALISA HARGA SATUAN

KODE ANALISA : P-AT-09


JENIS PEKERJAAN : Perbaikan mesin penggerak (Non PU)
SATUAN PEMBAYARAN : Unit

No Uraian Kode Satuan Koefisien

1 2 3 4 5
A Tenaga
1 Teknisi Bengkel L.02 OH 5.0000
2 Pekerja L.01 OH 10.0000
Jumlah Tenaga Kerja
B Bahan
1 Spare Part unit 1.0000
Jumlah Harga Bahan
C Peralatan
1 Tackle sewa-hari 5.0000
2 Handle Crane 2 T sewa-hari 5.0000
3 Peralatan Bengkel LS 5.0000
Jumlah Harga Alat
D Jumlah harga tenaga, bahan dan peralatan (A+B+C)
E Overhead + profit (Contoh 15%)

F Harga Satuan Pekerjaan per - unit JIAT(D+E)

ANALISA HARGA SATUAN

KODE ANALISA : P-AT-11


JENIS PEKERJAAN : Penggantian mesin penggerak (Non PU)
SATUAN PEMBAYARAN : Unit

No. Uraian Kode Satuan Koefisien

1 2 3 4 5
A Tenaga
1 Teknisi bengkel L.02 OH 1.0000
2 Pekerja L.01 OH 2.0000
Jumlah Tenaga Kerja
B Bahan
1 Mesin Penggerak Deutz 30 Kva unit 1.0000
Jumlah Harga Bahan
C Peralatan
1 Peralatan bengkel LS 1.0000
Jumlah Harga Alat
D Jumlah harga tenaga, bahan dan peralatan (A+B+C)
E Overhead + profit (Contoh 15%)
F Harga Satuan Pekerjaan per - unit JIAT(D+E)

ANALISA HARGA SATUAN

KODE ANALISA : P-AT-12


JENIS PEKERJAAN : Perbaikan Spare Part Mesin Pompa (Non PU)
SATUAN PEMBAYARAN : Unit

No. Uraian Kode Satuan Koefisien

1 2 3 4 5
A Tenaga Kerja
1 Teknisi Bengkel L.02 OH 0.5000
2 Pekerja L.01 OH 1.0000
Jumlah Harga Tenaga Kerja
B Bahan
1 Spare Part LS 1.0000
Jumlah Harga Bahan
C Peralatan
1 Peralatan Bengkel LS 0.3000
Jumlah Harga Lain-lain
D Jumlah harga tenaga, bahan dan peralatan (A+B+C)
E Overhead + profit (Contoh 15%)
Harga Satuan Pekerjaan per - unit
F
(D+E)

ANALISA HARGA SATUAN

KODE ANALISA : P-AT-13.a


JENIS PEKERJAAN : Penggantian Baru Unit Pompa Submersible (Non P
SATUAN PEMBAYARAN : Unit

No. Uraian Kode Satuan Koefisien


1 2 3 4 5
A Tenaga Kerja
1 Teknisi Bengkel L.02 OH 1.2000
2 Pekerja L.01 OH 2.4000
Jumlah Harga Tenaga Kerja
B Bahan
1 Pompa Submersible bh 1.0000
Jumlah Harga Bahan
C Peralatan
1 Tackel Sewa - Hari 0.4000
2 Handle Crane 2T Sewa - Hari 0.4000
3 Peralatan Bengkel LS 0.4000
Jumlah Harga Lain-lain
D Jumlah harga tenaga, bahan dan peralatan (A+B+C)
E Overhead + profit (Contoh 15%)
Harga Satuan Pekerjaan per - unit
F
(D+E)

ANALISA HARGA SATUAN

KODE ANALISA : P-AT-13.b


JENIS PEKERJAAN : Penggantian Baru Unit Pompa Turbin (Non PU)
SATUAN PEMBAYARAN : Unit

No. Uraian Kode Satuan Koefisien

1 2 3 4 5
A Tenaga Kerja
1 Teknisi Bengkel L.02 OH 1.2000
2 Pekerja L.01 OH 2.4000
Jumlah Harga Tenaga Kerja
B Bahan
1 Pompa Turbin bh 1.0000
Jumlah Harga Bahan
C Peralatan
1 Tackel Sewa - Hari 0.4000
2 Handle Crane 2T Sewa - Hari 0.4000
3 Peralatan Bengkel LS 0.4000
Jumlah Harga Lain-lain
D Jumlah harga tenaga, bahan dan peralatan (A+B+C)
E Overhead + profit (Contoh 15%)
Harga Satuan Pekerjaan per - unit
F
(D+E)
AN

k (Non PU)

Harga Satuan
Jumlah Harga (Rp)
(Rp)
6 7

119,700.00 598,500.00
100,800.00 1,008,000.00
1,606,500.00

13,439,505.00 13,439,505.00
13,439,505.00

50,000.00 250,000.00
250,000.00 1,250,000.00
100,000.00 500,000.00
2,000,000.00
17,046,005.00
15% 2,556,900.75
Unit 19,602,905.75

AN

k (Non PU)

Harga Satuan
Jumlah Harga (Rp)
(Rp)
6 7

119,700.00 598,500.00
100,800.00 1,008,000.00
1,606,500.00

5,000,000.00 5,000,000.00
5,000,000.00

50,000.00 250,000.00
250,000.00 1,250,000.00
100,000.00 500,000.00
2,000,000.00
8,606,500.00
15% 1,290,975.00

Unit 9,897,475.00

AN

rak (Non PU)

Harga Satuan
Jumlah Harga (Rp)
(Rp)
6 7

119,700.00 119,700.00
100,800.00 201,600.00
321,300.00

134,395,050.00 134,395,050.00
134,395,050.00

100,000.00 100,000.00
100,000.00
134,816,350.00
15% 20,222,452.50
Unit 155,038,802.50

AN

n Pompa (Non PU)

Harga Satuan
Jumlah Harga (Rp)
(Rp)
6 7

119,700.00 59,850.00
100,800.00 100,800.00
160,650.00
5,000,000.00 5,000,000.00
5,000,000.00

100,000.00 30,000.00
30,000.00
5,190,650.00
15% 778,597.50
5,969,247.50

AN

mpa Submersible (Non PU)

Harga Satuan
Jumlah Harga (Rp)
(Rp)
6 7 Pompa Submersible Debit 20 Ltr/Dtk, Head 52 M (minimal)

119,700.00 143,640.00
100,800.00 241,920.00
385,560.00

98,891,375.00 98,891,375.00
98,891,375.00

50,000.00 20,000.00 Pompa Submersible Debit 15 Ltr/Dtk, Head 60 M (minimal)


250,000.00 100,000.00
100,000.00 40,000.00
160,000.00
99,436,935.0000
15% 14,915,540.2500
114,352,475.2500

AN

mpa Turbin (Non PU) Pompa Turbin

Harga Satuan
Jumlah Harga (Rp)
(Rp)
6 7
119,700.00 143,640.00
100,800.00 241,920.00
385,560.00

40,273,200.00 40,273,200.00
40,273,200.00

50,000.00 20,000.00
250,000.00 100,000.00
100,000.00 40,000.00
160,000.00
40,818,760.0000
15% 6,122,814.0000
46,941,574.0000
1,128.83

5000 70,000,000
k, Head 52 M (minimal)

k, Head 60 M (minimal)
LEMBAR PERHITUNGAN

GAMBAR PERHITUNGAN

* Galian Tanah
Box = 0.25 x 0.45 x 4.20 = 0.47 m3
= 0.80 x 0.80 x 0.20 = 0.13 m3
Sal. 1 = 0.85 x 1.30 x 0.20 = 0.22 m3
= 0.25 + 0.45 x 0.20 x 1.30 = 0.18 m3
2
Sal. 2 = 0.85 x 1.30 x 0.20 = 0.22 m3
= 0.25 + 0.45 x 0.20 x 1.30 = 0.18 m3
2
= 1.41 m3

* Pas. Batu Kali


Box Pondasi = 0.25 x 0.45 x 4.20 = 0.47 m3
Lantai = 0.80 x 0.80 x 0.20 = 0.13 m3
Dinding = 0.25 x 0.80 x 4.20 = 0.84 m3
Sal. 1 Lantai = 0.85 x 1.30 x 0.20 = 0.22 m3
Pondasi = 0.25 + 0.45 x 0.20 x 1.30 = 0.18 m3
2
Dinding = 0.25 + 0.50 x 0.30 x 0.85 = 0.19 m3
2
= 0.15 x 0.50 x 0.85 = 0.06 m3
Sal. 2 Lantai = 0.85 x 1.30 x 0.20 = 0.22 m3
Pondasi = 0.25 + 0.45 x 0.20 x 1.30 = 0.18 m3
2
Dinding = 0.25 + 0.50 x 0.30 x 0.85 = 0.19 m3
2
= 0.15 x 0.50 x 0.85 = 0.06 m3

= 2.76 m3

* Plesteran
Box Dinding Dalam = 0.80 x 3.20 = 2.56 m2
Dinding Atas = 0.25 x 4.20 = 1.05 m2
Dinding Luar = 0.50 x 5.20 = 2.60 m2
Sal. 1 = 0.80 x 0.85 x 2.00 = 1.36 m2
Sal. 2 = 0.80 x 0.85 x 2.00 = 1.36 m2
= 8.93 m2

* Beton K - 225
= 1.05 x 1.05 x 0.10 = 0.11 m3
= 0.11 m3
* Baja Tulangan
= 6.00 x 1.05 x 0.62 = 3.88 kg
= 6.00 x 1.05 x 0.62 = 3.88 kg
= 7.76 kg

* Bekisting
= 0.80 x 0.80 = 0.64 m2
= 0.64 m2