Terbilang :
Lima Ratus Enam Puluh Enam Juta Enam Ratus Tujuh Puluh Ribu Rupiah
Dibuat Oleh :
Kepala Seksi Perencanaan Penyediaan PSU
Bidang Prasarana, Sarana dan Utilitas Umum
MUSLIHAN, A.Md.T
Nip. 19790810 200502 1 009
REKAPITULASI TAHAP 1
Di Buat Oleh :
Di Periksa Oleh : KELOMPOK SWADAYA MASYARAKAT
Fasilitator Teknik
HARIST FIRDAUS ARIFIN ,ST .............................
PPK
DINAS PERUMAHAN, KAWASAN PERMUKIMAN
DAN PERTANAHAN
KABUPATEN KEEROM
EDUARDUS GOBAY, ST., MT
NIP. 19750905 200112 1 007
ENGINEER'S ESTIMATE TAHAP 1
KEGIATAN : PEMBANGUNAN TANGKI SEPTIK SKALA KOMUNAL (5 - 10 KK) SWAKELOLA
PEKERJAAN : PEMBANGUNAN TANGKI SEPTIK SKALA KOMUNAL (5 - 10 KK)
LOKASI : KAMPUNG PETIWE
TAHUN ANGGARAN : 2022
HARGA SATUAN
NO. URAIAN PEKERJAAN VOLUME SAT.
(Rp.)
1 2 3 4 5
I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 5.00 Ls 300,000
2 Pemasangan Bouwplank/Pengukuran 5.00 LS 300,000
3 Transport Material Toko 3.00 LS 8,000,000
II ADMINISTRASI KSM
A BIAYA DOKUMENTASI
4 Papan Nama Program/ Kegiatan 5.00 Bh 20,000
B BIAYA ADMINISTRASI
5 Pengandaan Kontrak KSM 10.00 Paket 60,000
6 Pengandaan Laporan Termin I 10.00 Paket 60,000
7 Pengandaan Laporan Termin II 0.00 Paket 60,000
8 Pengandaan Laporan Akhir 0.00 Paket 60,000
9 Pembuatan Stampel 5.00 Bh 80,000
10 Pembukaan Rekening 5.00 Bh 40,000
11 Pembuatan Prasasti Keramik 0.00 Bh 1,000,000
IV PEKERJAAN BETON
1 Pek. Sloof beton 15/20 cm 0.00 M³ 5,086,282
2 Pek. Kolom beton 11/11 cm 0.00 M³ 9,268,586
3 Pek. Ring Balok 12/15 0.00 M³ 7,393,138
4 Pek. Coor bawah lantai & Rabat, camp. 1 : 3 : 5 0.00 M³ 1,365,250
X PEKERJAAN PENGECATAN
1 Pek. Cat Kilat Kayu 0.00 M² 60,886
2 Pek. Cat Tembok 0.00 M² 31,900
3 Pek. Cat Plafond 0.00 M² 31,905
XI PEKERJAAN AKHIR
1 Pembesihan Akhir 0.00 Ls 866,017
E TAHAP 1
JUMLAH HARGA
(Rp.)
6
1,500,000
1,500,001
24,000,000
27,000,001
100,000
600,000
600,000
-
-
400,000
200,000
-
1,900,000
937,125
-
-
-
-
-
937,125
10,703,306
78,209,567
-
-
-
-
-
88,912,874
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
JUMLAH HARGA
(Rp.)
6
-
-
-
-
-
-
-
-
37,500,000
-
-
-
-
37,500,000
-
-
-
-
-
-
-
-
-
-
RENCANA PENGGUNAAN DANA TAHAP 1
KEGIATAN : PEMBANGUNAN TANGKI SEPTIK SKALA KOMUNAL (5 - 10 KK) SWAKELOLA
PEKERJAAN : PEMBANGUNAN TANGKI SEPTIK SKALA KOMUNAL (5 - 10 KK)
LOKASI : KAMPUNG PETIWE
TAHUN ANGGARAN : 2022
JUMLAH
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME PENGAJUAN SAT.
(Rp.) (Rp.)
SEKARANG
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 5.00 5.00 Ls 300,000 1,500,000
2 Pemasangan Bouwplank/Pengukuran 5.00 5.00 LS 300,000 1,500,001
3 Transport Material Toko 3.00 3.00 LS 8,000,000 24,000,000
0
II ADMINISTRASI KSM
A BIAYA DOKUMENTASI
4 Papan Nama Program/ Kegiatan 5.00 5.00 Bh 20,000 100,000
B BIAYA ADMINISTRASI
5 Pengandaan Kontrak KSM 10.00 10.00 Paket 60,000 600,000
6 Pengandaan Laporan Termin I 10.00 10.00 Paket 60,000 600,000
7 Pengandaan Laporan Termin II 0.00 0.00 Paket 60,000 -
8 Pengandaan Laporan Akhir 0.00 0.00 Paket 60,000 -
9 Pembuatan Stampel 5.00 5.00 Bh 80,000 400,000
10 Pembukaan Rekening 5.00 5.00 Bh 40,000 200,000
11 Pembuatan Prasasti Keramik 0.00 0.00 Bh 1,000,000 -
X PEKERJAAN PENGECATAN
1 Pek. Cat Kilat Kayu 0.00 0.00 M² 60,886 -
2 Pek. Cat Tembok 0.00 0.00 M² 31,900 -
3 Pek. Cat Plafond 0.00 0.00 M² 31,905 -
XI PEKERJAAN AKHIR
1 Pembesihan Akhir 0.00 0.00 Ls 866,017 -
TOTAL DANA 100% 156,250,000
HARGA SATUAN
No. URAIAN PEKERJAAN VOLUME SATUAN JUMLAH HARGA (Rp.)
(Rp)
1 2 3 4
26 Pek. Kolom beton 11/11 cm - M3 0.000000000
Beton
4.4080 Zak. Semen Pc (50 Kg) - 100,000.00 -
0.4940 M3. Pasir Beton - 450,000.00 -
0.7410 M3. Kerikil Cor - 450,000.00 -
1.5675 OH. Pekerja - 150,000.00 -
0.2375 OH. Tukang Batu - 225,000.00 -
Kg. Besi Beton - -
1.0500 Kg. Besi Beton (Polos) - 19,000.00 -
0.0150 Kg. Kawat Beton - 30,000.00 -
0.0070 OH. Pekerja - 150,000.00 -
0.0070 OH. Tukang Batu - 225,000.00 -
1M2. Bekesting Untuk Kolom - -
0.0400 M3. Balok/Papan Kayu Kelas II - 2,000,000.00 -
0.4000 Kg. Paku Campur - 25,000.00 -
0.0150 M3. Balok Kayu Kelas II - 2,000,000.00 -
0.1604 Ltr. Minyak Bekisting - 13,653.00 -
0.6600 OH. Pekerja - 150,000.00 -
0.3300 OH. Tukang Kayu - 225,000.00 -
-
-
PEMBULATAN
27 Pek. Ring Balok 12/15 - M3 0.00
M3. Beton
4.4727 Zak. Semen Pc (50 Kg) - 100,000.00 -
0.5200 M3. Pasir Beton - 450,000.00 -
0.7519 M3. Kerikil Cor - 450,000.00 -
1.5905 OH. Pekerja - 150,000.00 -
0.2410 OH. Tukang Batu - 225,000.00 -
Kg. Besi Beton - -
1.0500 Kg. Besi Beton (Polos) - 19,000.00 -
0.0150 Kg. Kawat Beton - 30,000.00 -
0.0070 OH. Pekerja - 150,000.00 -
0.0070 OH. Tukang Batu - 225,000.00 -
1M2. Bekesting Untuk Ring Balok - -
0.0400 M3. Balok/Papan Kayu Kelas II - 2,000,000.00 -
0.4000 Kg. Paku Campur - 25,000.00 -
0.0180 M3. Balok Kayu Kelas II - 2,000,000.00 -
0.0146 Ltr. Minyak Bekisting - 13,653.00 -
0.6600 OH. Pekerja - 150,000.00 -
0.3300 OH. Tukang Kayu - 225,000.00 -
-
-
PEMBULATAN
28 Pek. Coor bawah lantai & Rabat, camp. 1 : 3 : 5 - M3
4.3600 Zak. Semen Pc (50 Kg) - 100,000.00 -
0.5200 M3. Pasir Beton - 450,000.00 -
0.8700 M3. Kerikil Cor - 450,000.00 -
1.6500 OH. Pekerja - 150,000.00 -
0.2500 OH. Tukang Batu - 225,000.00 -
-
29 0 - M3
4.3600 Zak. Semen Pc (50 Kg) - 86,000.00 -
0.5200 M3. Pasir Beton - 450,000.00 -
0.8700 M3. Kerikil Cor - 450,000.00 -
1.6500 OH. Pekerja - 150,000.00 -
0.2500 OH. Tukang Batu - 225,000.00 -
-
30 Pek. Pasang Kusen Kayu besi 5/10 - M3
1.1000 M3. Balok Kayu Besi 5/10 - 4,000,000.00 -
1.2500 Kg. Paku 10 cm - 25,000.00 -
1.0000 Kg. Lem Kayu - 65,000.00 -
7.0000 OH. Pekerja - 150,000.00 -
21.0000 OH. Tukang Kayu - 225,000.00 -
-
31 Pek. Pasang Pintu Panel - M3
0.0400 M3. Papan Kayu Kelas I - 4,000,000.00 -
0.5000 Kg. Lem Kayu - 65,000.00 -
1.0000 OH. Pekerja - 150,000.00 -
3.0000 OH. Tukang Kayu - 225,000.00 -
-
32 Pek. Ventilasi Kayu Besi - M3
1.1000 M3. Balok Kayu Besi 5/10 - 4,000,000.00 -
1.2500 Kg. Paku 10 cm - 25,000.00 -
1.0000 Kg. Lem Kayu - 65,000.00 -
7.0000 OH. Pekerja - 150,000.00 -
21.0000 OH. Tukang Kayu - 225,000.00 -
-
33 Pek. Kuda-kuda Balok Kayu besi 5/10 -
1.1000 M3. Balok Kayu Besi 5/10 - 4,000,000.00 -
0.5600 Kg. Paku 12 cm - 25,000.00 -
4.0000 OH. Pekerja - 150,000.00 -
12.0000 OH. Tukang Kayu - 225,000.00 -
-
ANALISA SATUAN PEKERJAAN
HARGA SATUAN
No. URAIAN PEKERJAAN
(Rp)
1 2 3
1 2 3
Per - 1 Kg
1 2 3
26 1M2. Ventilasi
1.1000 M3. Balok Kayu Besi 5/10 4,000,000.00
1.2500 Kg. Paku 10 cm 25,000.00
1.0000 Kg. Lem Kayu 65,000.00
7.0000 OH. Pekerja 150,000.00
21.0000 OH. Tukang Kayu 225,000.00
HARGA SATUAN
No. URAIAN PEKERJAAN
(Rp)
1 2 3
32 1M2 Pengecatan Bidang Kayu Baru (1 Lps Plamur Kayu, 1 Cat Dasar, 2 Cat Penutup)
0.2000 Kg. Cat Meni 41,667.00
0.1500 Kg. Plamur / Dempul 64,000.00
0.1700 Kg. Minyak Cat (Thiner) 54,719.00
0.2600 Kg. Cat Kilat Kayu 81,250.00
0.0700 OH. Pekerja 150,000.00
0.0090 OH. Tukang Cat 225,000.00
33 1M2 Cat Dinding Tembok Baru (1xPlamir, 1x Cat Dasar, 2 Lapis Cat Penutup)
0.1000 Kg. Plamur / Dempul 64,000.00
0.1000 Kg. Cat Dasar 23,125.00
0.2600 Kg. Cat Penutup 2x 23,125.00
0.0200 OH. Pekerja 150,000.00
0.0630 OH. Tukang Cat 225,000.00
1 2 3
1 2 3
JUMLAH HARGA
(Rp.)
150,000.00
8,320.00
158,320.00
112,500.00
6,500.00
119,000.00
75,000.00
13,000.00
88,000.00
45,000.00
2,600.00
540,000.00
587,600.00
37,500.00
6,500.00
360,000.00
404,000.00
24,000.00
500.00
14,000.00
15,000.00
22,500.00
76,000.00
960,000.00
194,400.00
117,000.00
87,750.00
1,359,150.00
326,000.00
960,000.00
234,000.00
225,000.00
168,750.00
1,913,750.00
JUMLAH HARGA
(Rp.)
60,000.00
23,000.00
19,350.00
45,000.00
22,500.00
169,850.00
20,500.00
11,700.00
45,000.00
33,750.00
110,950.00
6,500.00
22,500.00
22,500.00
51,500.00
436,000.00
234,000.00
391,500.00
247,500.00
56,250.00
1,365,250.00
464,000.00
234,000.00
351,000.00
247,500.00
56,250.00
1,352,750.00
199,500.00
4,500.00
10,500.00
15,750.00
230,250.00
23,025.00
90,000.00
7,500.00
1,365.30
78,000.00
58,500.00
235,365.30
80,000.00
10,000.00
30,000.00
2,730.60
99,000.00
74,250.00
295,980.60
JUMLAH HARGA
(Rp.)
80,000.00
10,000.00
36,000.00
2,730.60
99,000.00
74,250.00
0.00
0.00
301,980.60
1,323,488.51
3,292,063.33
470,730.60
5,086,282.45
1,280,200.86
5,297,652.89
2,690,732.73
9,268,586.48
1,303,980.86
5,082,555.56
1,006,602.00
7,393,138.41
1,352,750.00
3,292,063.33
1,006,602.00
5,651,415.33
4,400,000.00
14,000.00
600,000.00
2,700,000.00
7,714,000.00
4,400,000.00
75,000.00
360,000.00
1,620,000.00
6,455,000.00
4,400,000.00
31,250.00
65,000.00
1,050,000.00
4,725,000.00
10,271,250.00
160,000.00
32,500.00
150,000.00
675,000.00
1,017,500.00
4,400,000.00
31,250.00
65,000.00
1,050,000.00
4,725,000.00
10,271,250.00
JUMLAH HARGA
(Rp.)
34,400.00
1,500.00
15,000.00
22,500.00
73,400.00
66,500.00
730.00
18,000.00
13,500.00
98,730.00
65,000.00
1,460.00
22,500.00
15,750.00
104,710.00
24,000.00
2,500.00
22,500.00
56,250.00
105,250.00
37,500.00
1,087.50
15,000.00
22,500.00
76,087.50
181,337.5
37,800.00
250.00
7,500.00
11,250.00
56,800.00
8,333.40
9,600.00
9,302.23
21,125.00
10,500.00
2,025.00
60,885.63
6,400.00
2,312.50
6,012.50
3,000.00
14,175.00
31,900.00
2,775.00
15,480.00
4,200.00
9,450.00
31,905.00
JUMLAH HARGA
(Rp.)
190,000.00
750.00
112,500.00
303,250.00
36,000.00
3,000.00
45,000.00
84,000.00
50,000.00
2,250.00
33,750.00
86,000.00
100,000.00
20,250.00
20,000.00
34,000.00
40,500.00
30,375.00
245,125.00
100,000.00
9,000.00
20,000.00
34,000.00
40,500.00
30,375.00
233,875.00
500,000.00
12,000.00
4,500.00
150,000.00
337,500.00
1,004,000.00
12,000.00
3,500.00
5,400.00
13,500.00
34,400.00
64,500.00
18,812.50
12,150.00
30,375.00
125,837.50
JUMLAH HARGA
(Rp.)
7,500.00
2,187.50
12,150.00
30,375.00
52,212.50
43,750.00
1,500.00
22,500.00
67,750.00
57,000.00
1,250.00
1,500.00
22,500.00
82,250.00
50,000.00
59,800.00
75,000.00
45,000.00
229,800.00
36,500.00
59,800.00
75,000.00
112,500.00
283,800.00
36,500.00
59,800.00
75,000.00
112,500.00
283,800.00
36,000.00
59,800.00
75,000.00
112,500.00
283,300.00
700,000.00
59,800.00
9,300.00
75,000.00
844,100.00
ANALISA VOLUME
1 2 3
21 Pek. Plesteran 1 : 2 - M²
0.2050 Zak. Semen PC. (50 Kg) - 100,000.00
0.0260 M3. Pasir Beton - 450,000.00
0.3000 OH. Pekerja - 150,000.00
0.1500 OH. Tukang Batu - 225,000.00
22 Pek. Acian - M²
0.0650 Zak. Semen PC. (50 Kg) - 100,000.00
0.1500 OH. Pekerja - 150,000.00
0.1000 OH. Tukang Batu - 225,000.00
PEMBULATAN
27 Pek. Ring Balok 12/15 - M3 0.00
M3. Beton
4.4727 Zak. Semen Pc (50 Kg) - 100,000.00
0.5200 M3. Pasir Beton - 450,000.00
0.7519 M3. Kerikil Cor - 450,000.00
1.5905 OH. Pekerja - 150,000.00
0.2410 OH. Tukang Batu - 225,000.00
Kg. Besi Beton -
1.0500 Kg. Besi Beton (Polos) - 19,000.00
0.0150 Kg. Kawat Beton - 30,000.00
0.0070 OH. Pekerja - 150,000.00
0.0070 OH. Tukang Batu - 225,000.00
1M2. Bekesting Untuk Ring Balok -
0.0400 M3. Balok/Papan Kayu Kelas II - 2,000,000.00
0.4000 Kg. Paku Campur - 25,000.00
0.0180 M3. Balok Kayu Kelas II - 2,000,000.00
0.0146 Ltr. Minyak Bekisting - 13,653.00
0.6600 OH. Pekerja - 150,000.00
0.3300 OH. Tukang Kayu - 225,000.00
PEMBULATAN
28 Pek. Coor bawah lantai & Rabat, camp. 1 : 3 : 5 - M3
4.3600 Zak. Semen Pc (50 Kg) - 100,000.00
0.5200 M3. Pasir Beton - 450,000.00
0.8700 M3. Kerikil Cor - 450,000.00
1.6500 OH. Pekerja - 150,000.00
0.2500 OH. Tukang Batu - 225,000.00
29 0 - M3
4.3600 Zak. Semen Pc (50 Kg) - 86,000.00
0.5200 M3. Pasir Beton - 450,000.00
0.8700 M3. Kerikil Cor - 450,000.00
1.6500 OH. Pekerja - 150,000.00
0.2500 OH. Tukang Batu - 225,000.00
54 Stop Kontak - M2
1.0000 Bh. Stop Kontak - 36,000.00
2.0000 M'. Kabel NYM 2 x 2,5 mm - 29,900.00
0.5000 OH. Pekerja - 150,000.00
0.5000 OH. Tukang listrik - 225,000.00
58 Pekerjaan Akhir - LS
1.0000 Pekerjaan Akhir - 866,017.01
1,500,001.20
1,500,001.20
100,000.00
100,000.00
600,000.00
600,000.00
600,000.00
600,000.00
-
-
-
-
400,000.00
400,000.00
200,000.00
200,000.00
-
-
24,000,000.00
24,000,000.00
1,500,000.00
1,500,000.00
28,900,001.20
885,937.50
51,187.50
937,125.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
7,560,000.00
1,530,900.00
921,375.00
691,031.25
10,703,306.25
13,322,700.97
39,232,493.66
9,562,920.33
9,195,115.70
6,896,336.78
78,209,567.45
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
288,000.00
84,000.00
129,600.00
324,000.00
825,600.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
37,500,000.00
37,500,000.00
-
-
-
-
-
-
-
-
-
-
-
-
ANALISA PEMBERDAYAAN TAHAP 1
: PEMBANGUNAN TANGKI SEPTIK SKALA KOMUNAL (5 - 10
KEGIATAN
:KK) SWAKELOLA TANGKI SEPTIK SKALA KOMUNAL (5 - 10
PEMBANGUNAN
PEKERJAAN
KK)
LOKASI : KAMPUNG PETIWE
TAHUN ANGGARAN : 2022
### #REF!
### #REF! #REF! #REF! #REF! #REF! #REF!
#REF!
TOTAL DANA 50% #REF!
TOTAL PEMBULATAN #REF!
ANALISA BAHAN LOKAL TAHAP 1
HARGA SATUAN
No. URAIAN PEKERJAAN VOLUME SATUAN
(Rp)
1 2 3
21 Pek. Plesteran 1 : 2 - M²
0.2050 Zak. Semen PC. (50 Kg) - 86,000.00
0.0260 M3. Pasir Beton - 450,000.00
0.3000 OH. Pekerja - 150,000.00
0.1500 OH. Tukang Batu - 225,000.00
22 Pek. Acian - M²
0.0650 Zak. Semen PC. (50 Kg) - 86,000.00
0.1500 OH. Pekerja - 150,000.00
0.1000 OH. Tukang Batu - 225,000.00
PEMBULATAN
27 Pek. Kolom beton 11/11 cm #REF! M3 0.00
M3. Beton
4.6400 Zak. Semen Pc (50 Kg) #REF! 86,000.00
0.5200 M3. Pasir Beton #REF! 450,000.00
0.7800 M3. Kerikil Cor #REF! 450,000.00
1.6500 OH. Pekerja #REF! 150,000.00
0.2500 OH. Tukang Batu #REF! 200,000.00
Kg. Besi Beton #REF!
1.0500 Kg. Besi Beton (Polos) #REF! 19,000.00
0.0150 Kg. Kawat Beton #REF! 30,000.00
0.0070 OH. Pekerja #REF! 150,000.00
0.0070 OH. Tukang Batu #REF! 200,000.00
1M2. Bekesting Untuk Ring Balok #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
PEMBULATAN
28 Pek. Coor bawah lantai & Rabat, camp. 1 : 3 : 5 - M3
4.3600 Zak. Semen Pc (50 Kg) - 86,000.00
0.5200 M3. Pasir Beton - 450,000.00
0.8700 M3. Kerikil Cor - 450,000.00
1.6500 OH. Pekerja - #REF!
0.2500 OH. Tukang Batu - #REF!
29 Err:509 Err:509 M3
4.3600 Zak. Semen Pc (50 Kg) Err:509 86,000.00
0.5200 M3. Pasir Beton Err:509 450,000.00
0.8700 M3. Kerikil Cor Err:509 450,000.00
1.6500 OH. Pekerja Err:509 #REF!
0.2500 OH. Tukang Batu Err:509 #REF!
54 Stop Kontak - M2
1.0000 Bh. Stop Kontak - 36,500.00
2.0000 M'. Kabel NYM 2 x 2,5 mm - 29,900.00
0.3967 OH. Pekerja - 150,000.00
0.5000 OH. Tukang listrik - 225,000.00
58 Pekerjaan Akhir - LS
1.0000 Pekerjaan Akhir - 0.00
15 jt
#REF!
JUMLAH HARGA (Rp.)
1,500,001.20
1,500,001.20
100,000.00
100,000.00
600,000.00
600,000.00
600,000.00
600,000.00
-
-
-
-
400,000.00
400,000.00
200,000.00
200,000.00
-
-
Err:509
Err:509
24,000,000.00
24,000,000.00
1,500,000.00
1,500,000.00
Err:509 Err:509
885,937.50
41,343.75
927,281.25 927,281.25
-
-
- 0.00
-
-
- 0.00
-
-
-
- 0.00
-
-
-
- 0.00
-
-
-
- 0.00
7,560,000.00
1,530,900.00
921,375.00
691,031.25
10,703,306.25 10,703,306.25
13,322,700.97
39,232,493.66
9,562,920.33
9,195,115.70
6,896,336.78
78,209,567.45 78,209,567.45
-
-
-
-
-
- 0.00
-
-
-
-
- 0.00
-
-
-
- 0.00
-
-
-
-
-
-
- 0.00
-
-
-
-
-
-
- 0.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF! #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF! #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF! #REF!
-
-
-
#REF!
#REF!
#REF! #REF!
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 Err:509
-
-
-
#REF!
#REF!
#REF! #REF!
-
-
#REF!
#REF!
#REF! #REF!
-
-
-
#REF!
#REF!
#REF! #REF!
-
-
-
-
- 0.00
-
-
-
-
- 0.00
-
-
-
-
- 0.00
-
-
-
-
- 0.00
-
-
-
-
- 0.00
-
-
-
-
- 0.00
-
-
-
-
-
-
-
-
- 0.00
-
-
-
-
- 0.00
-
-
-
- 0.00
-
-
-
- 0.00
-
-
-
-
- 0.00
-
-
-
-
- 0.00
-
-
-
-
-
- 0.00
-
-
-
- 0.00
-
-
-
-
- 0.00
-
- 0.00
-
- 0.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509 Err:509
-
- 0.00
-
-
-
-
- 0.00
-
-
-
-
- 0.00
-
-
-
-
- 0.00
-
-
-
-
-
-
- 0.00
-
-
-
-
-
- 0.00
-
-
-
-
- 0.00
-
- 0.00
-
- 0.00
37,500,000.00
37,500,000.00 37,500,000.00
-
-
-
-
-
- 0.00
-
-
-
-
-
- 0.00
Err:509
Err:509
156,249,999.90
Err:509
DAFTAR HARGA BAHAN, UPAH & PERALATAN
: PEMBANGUNAN TANGKI SEPTIK SKALA KOMUNAL (5 - 10 KK)
KEGIATAN SWAKELOLA
PEKERJAAN : PEMBANGUNAN TANGKI SEPTIK SKALA KOMUNAL (5 - 10 KK)
LOKASI
T. ANGGARAN
I. DAFTAR BAHAN/MATERIAL
B. BAHAN KAYU
1 Balok/papan Bekesting M3 2,000,000
2 Balok/papan Kayu Matoa M3 2,000,000
3 Balok Kayu Besi M3 4,000,000
4 Papan Kayu Besi M3 4,000,000
5 Dolken Kayu steger/buah dia 8-10 cm, panjang 4m Btg 60,000
6 Kayu list kaca Btg 28,000
7 List plafond kayu matoa diprofil Btg 36,000