V 1.00 Ls 1.00 Ls
2 Pembersihan Lokasi
Ls 1 Ls
300 150 150
200
WC
- 0.02
250
K .T ID UR 2
300
190
A
250
R .TAM U &
R .KE LUA RGA
± 0.00
300
K .T ID UR 1
±0.00
200
V= 1 Ls
T ERAS
- 0.02
B
300 300
V= 1 Ls Ls 1 Ls
4 Pemasangan bowplank
P= 187.00 M¹ 394.00 M¹
300 150 150 L= 10.00
200
WC
- 0.02
V= 2X(P+L)
250
K .TID UR 2
300
A
190
V= 2 X (10 + 187 )
250
R .TAM U &
R .KE LUA RGA
± 0. 00
300
K .TID UR 1
± 0.00
200
TERAS
- 0. 02
B
V= 394.00 M¹
300 300
V 1 Ls Ls 1 Ls
BACK UP DATA
NAMA PEKERJAAN : PEMBANGUNAN RUMAH KHUSUS TYPE 36 M2 + (DAK)
6 Mobilisasi Excavator
V 1 Ls Ls 1 Ls
7 Pek.Demobilisasi
V 1 Ls Ls 1 Ls
P= 434.00 M³ 143.871 M³
L= 0.66
TP = 0.50
P= 434.00 M³ 11.935 M³
L= 0.55
TP = 0.05
Sloof 15/20
L= 0.40
Urugan Pasir
Urugan karang
20
20
60
P= 434 M³ 47.957 M³
L= 0.663
TP = 0.5
BACK UP DATA
NAMA PEKERJAAN : PEMBANGUNAN RUMAH KHUSUS TYPE 36 M2 + (DAK)
P= 500 M³ 321.20 M³
200
L= 0.73
TP = 0.88
A
250
300
190
250
300
TYPE KOLOM V= (P X L X T)
PEIL PRAKTIS
± 0,00
P= 452 M³ 3.66 M³
L= 0.09
TP = 0.09
KETERANGAN
DIMENSI 11 cm x 11 cm
Tulangan Atas 2 Ø10
Tulangan Tengah -
Tulangan Bawah 2 Ø10
Sengkang Ø 8 - 150
KETERANGAN
DIMENSI 11 cm x 11 cm
Tulangan Atas 2 Ø10
Tulangan Tengah -
Tulangan Bawah 2 Ø10
Sengkang Ø 8 - 150
BACK UP DATA
NAMA PEKERJAAN : PEMBANGUNAN RUMAH KHUSUS TYPE 36 M2 + (DAK)
KETERANGAN
DIMENSI 12 cm x 15 cm 12 cm x 15 cm
Tulangan Atas 2 Ø12 2 Ø12
Tulangan Tengah - -
Tulangan Bawah 2 Ø12 2 Ø12
Sengkang Ø 8 - 150 Ø 8 - 150
V= (P X L X T) X 10 Unit
P= 6 M³ 18.72 M³
L= 6
TP = 0.052
V= (P X L ) X 10 Unit
P= 38.67 M² 1082.76 M²
L= 2.8
Plesteran
V= (P X L ) X 10 Unit) X 2 SISI
P= 37.6 M² 2,105.60 M²
L= 2.8
21 Pekerjaan Acian
Plesteran
V= (P X L ) X 10 Unit) X 2 SISI
P= 37.6 M² 2,105.60 M²
L= 2.8
BACK UP DATA
NAMA PEKERJAAN : PEMBANGUNAN RUMAH KHUSUS TYPE 36 M2 + (DAK)
K.20x20
V= (P X L ) X 10 Unit) M² 366.00 M²
-0.03
P= 6.1
Keramik 40x40
±0.00
Keramik 40x40
±0.00
L= 6
Keramik 40x40
±0.00
Keramik 40x40
±0.00
Keramik 40x40
-0.03
K.20x20
-0.03 V= (P X L ) X 10 Unit)
M² 26.6 M²
P= 1.4
L= 1.9
Keramik 40x40 Keramik 40x40
±0.00 ±0.00
Keramik 40x40
±0.00
Keramik 40x40
±0.00
Keramik 40x40
-0.03
5
10
5 5
10
5 5
10
5
5
10
5 5
10
5 V= (P X L X T) X 10 Unit
20 20 20 20 20
20
P= 59.9 M3 2.995
20
20
25
25
25
25
L= 0.05
15
T= 0.1
120
210
48 48
110
80
10 10
5 5 5 5
V= (P X L X 5 BH ) X 10 Unit)
M² 67.50 M²
20 20
P= 1.8 M
20
L= 0.75 M
25
25
210
80
V= (P X L X 4 BH ) X 10 Unit)
M² 45.60 M²
P= 1.2 M
L= 0.475 M
48 48
110
BACK UP DATA
NAMA PEKERJAAN : PEMBANGUNAN RUMAH KHUSUS TYPE 36 M2 + (DAK)
V= (P X L X 4 BH ) X 10 Unit)
M² 26.64 M²
P= 0.9 M
L= 0.37 M
V= (P X L X T X 3 BH ) X 10 Unit)
1 85
85 1
394
529
27
M3
182
182
5.10 M3
P= 34 M
28
9
1306
L= 0.05 M
T= 0.1
3
32
89
76
401
V= (P X L X T X 2 BH ) X 10 Unit)
P= 12 M M3 1.20 M3
L= 0.05 M
T= 0.1 M
310
760
V= (P X L X T X 10 Unit)
P= 98 M
L= 0.05 M M3 4.90 M3
T= 0.1 M
80
440
307
314
370
BACK UP DATA
NAMA PEKERJAAN : PEMBANGUNAN RUMAH KHUSUS TYPE 36 M2 + (DAK)
P= 32.96 M M 329.6 M
Unit = 10 Unit
V= (P X L ) X 10 Unit)
M² 705.60 M²
P= 8.4 M
L= 8.4 M
P= 2.61 M M² 78.30 M²
L= 3 M
M² 783.90 M²
V= (P X 10 Unit)
M² 177.60 M²
P= 17.76 M
UNIT 10 M
BACK UP DATA
NAMA PEKERJAAN : PEMBANGUNAN RUMAH KHUSUS TYPE 36 M2 + (DAK)
V= (P X L ) X 10 Unit)
8 5 5
18
M² 597.43 M²
LAMPU SL P= 7.63 M
PLAFOND TRIPLEKS 3MM
L= 7.83 M
RANGKA PLAFOND 5/5, KY MATOA
LIST PLAFOND
Triplek 3 mm
Triplek 3 mm
V= (P X L ) X 10 Unit)
M² 597.43 M²
P= 7.63 M
Triplek 3 mm Triplek 3 mm
L= 7.83 M
60
120
V= (P X 10 Unit)
M 847.42 M
P= 84.742 M
8 5 5
18
UNIT 10 M
LAMPU SL
PLAFOND TRIPLEKS 3MM
RANGKA PLAFOND 5/5, KY MATOA
LIST PLAFOND
BACK UP DATA
NAMA PEKERJAAN : PEMBANGUNAN RUMAH KHUSUS TYPE 36 M2 + (DAK)
DAYA 1.200 VA
V= (JUMLAH TITIK X 10 Unit)
A B C D
MCB 6A 1 Saklar Tunggal Saklar Ganda Lampu SL 14 watt Jenis Kabel TK 60.00 TK
JUMLAH 6 TITIK
2 N YM
1 Stop Kotak
A B
Jenis Kabel
UNIT 10 TITIK
2 NYM
DAYA 1.200 VA A B C D
MCB 6A 1 Saklar Tunggal Saklar Ganda Lampu SL 14 watt Jenis Kabel
2 N YM
DARI PLN
3 2 Tit ik 10 Tit ik 6 Titik 2 x 1,5 mm2 V= (JUMLAH TITIK X 10 Unit)
TK 20.00 TK
A B
1 Stop Kotak Jenis Kabel
JUMLAH 2 TITIK
2 NYM
UNIT 10 TITIK
DAYA 1.200 VA
V= (JUMLAH TITIK X 10 Unit)
A B C D
MCB 6A 1 Saklar Tunggal Saklar Ganda Lampu SL 14 watt Jenis Kabel TK 20.00 TK
2 N YM
1
A
Stop Kotak
B
Jenis Kabel UNIT 10 TITIK
2 NYM
DAYA 1.200 VA A B C D
MCB 6A 1
2
Saklar Tunggal Saklar Ganda Lampu SL 14 watt Jenis Kabel
NYM
V= (JUMLAH TITIK X 10 Unit)
DARI PLN
3 2 Titik 10 Titik 6 Titik 2 x 1,5 mm2
TK 40.00 TK
A B
1 Stop Kotak Jenis Kabel
JUMLAH 4 TITIK
2 N YM
V= (P X L ) X 10 Unit) X 2 SISI
P= 37.6 M² 2,105.60 M²
L= 2.8
BACK UP DATA
NAMA PEKERJAAN : PEMBANGUNAN RUMAH KHUSUS TYPE 36 M2 + (DAK)
V= (P X L ) X 10 Unit)
P= 209.5 M² 314.25 M²
L= 0.15
V= (P X L ) X 10 Unit)
M² 597.43 M²
P= 7.63 M
L= 7.83 M
V= P X L X T)
M 519.00 M
P 173 M
L 6 M
T 0.5 M
V= P X L X T)
M 32.00 M
P 160 M
L 0.5 M
T 0.4 M
V 1 LS Ls 1 Ls
BACK UP DATA
NAMA PEKERJAAN : PEMBANGUNAN RUMAH KHUSUS TYPE 36 M2 + (DAK)
63 Pembersihan Akhir/Finishing
V 1 LS Ls 1 Ls
Dibuat oleh :
Di Setujui : KONTRAKTOR PELAKSANA
Pejabat Pelaksana Teknis Kegiatan CV.SINAR AMBAIDIRU UTAMA
Disetujui oleh : Dinas Perumahan, Kawasan Permukiman dan Pertanahan Kabupaten
Pejabat Pembuat Komitmen Keerom
Dinas Perumahan, Kawasan Permukiman dan Pertanahan
Kabupaten Keerom