REKAPITULASI

BILL OF QUANTITY (BOQ)

Pekerjaan : Rehabilitasi Ruang Kelas SDN Puspanegara 05 Kec. Citeureup


Lokasi : Kecamatan Citeureup Kabupaten Bogor
Tahun Anggaran : 2021

NO URAIAN PEKERJAAN JUMLAH

I. PEKERJAAN PERSIAPAN 8,300,000.00


LANTAI BAWAH
II. PEKERJAAN PASANGAN 11,206,357.00
III. PEKERJAAN KUSEN ALUMUNIUM 9,399,100.00
IV. PEKERJAAN ATAP DAN PLAFOND 30,915,885.00
V. PEKERJAAN PENGECATAN DAN PENYELESAIAN 16,467,814.00
LANTAI ATAS
VI. PEKERJAAN PASANGAN 14,401,101.00
VII. PEKERJAAN KUSEN ALUMUNIUM 20,426,350.00
VIII. PEKERJAAN ATAP DAN PLAFOND 151,002,378.00
IX. PEKERJAAN INSTALASI LISTRIK 6,958,900.00
X. PEKERJAAN PENGECATAN DAN PENYELESAIAN 17,810,560.00

JUMLAH 286,888,445.00
PPN 10% 28,688,844.50
JUMLAH TOTAL 315,577,289.50
JUMLAH TOTAL 315,577,000.00

Terbilang :
#NAME?

Bogor, 05 Agustus 2021


Penawar,
CV. GUNADHYA TOMO MANDIRI

SEM FERDINAN GULTOM


Direktur
BILL OF QUANTITY (BOQ)

Pekerjaan : Rehabilitasi Ruang Kelas SDN Puspanegara 05 Kec. Citeureup


Lokasi : Kecamatan Citeureup Kabupaten Bogor
Tahun Anggaran : 2021

No. Uraian Pekerjaan Satuan Volume Harga Satuan Jumlah

I. PEKERJAAN PERSIAPAN
1 Biaya Pembuatan Papan Proyek unit 1.00 300,000.00 300,000.00
2 Biaya Administrasi dan Dokumentasi ls 1.00 1,000,000.00 1,000,000.00
3 Biaya Bongkaran ls 1.00 3,500,000.00 3,500,000.00
4 Biaya Pengadaan Alat Bantu / Prancah ls 1.00 1,500,000.00 1,500,000.00
5 Biaya Pengadaan Listrik dan Air Kerja ls 1.00 1,000,000.00 1,000,000.00
6 Biaya K3 ls 1.00 1,000,000.00 1,000,000.00
8,300,000.00
LANTAI BAWAH
II. PEKERJAAN PASANGAN
1 Plesteran 15 tebal 15 mm m2 25.99 78,900.00 2,050,611.00
2 Acian m2 25.99 46,600.00 1,211,134.00
3 Rabat Beton beton t= 5cm Mutu K-100 (135) m3 0.68 1,088,900.00 740,452.00
4 Saluran Air Hujan Bata Merah Besar lebar 20cm m1 47.90 150,400.00 7,204,160.00
11,206,357.00
III. PEKERJAAN KUSEN ALUMUNIUM
1 Pemasangan Daun Pintu Alumunium 0,8 x 2,10 m (Daun Pintu Panel Multyplek 9mm Lapis HPL) unit 3.00 999,700.00 2,999,100.00
2 Kusen Pintu Besi uk. 0,7x1,95m unit 4.00 1,600,000.00 6,400,000.00
9,399,100.00
IV. PEKERJAAN ATAP DAN PLAFOND
1 Kuda - Kuda Baja Ringan m2 36.75 170,000.00 6,247,500.00
2 Atap U-PVC tebal 12mm Merah Maroon m2 84.75 264,300.00 22,399,425.00
3 Listplank GRC tebal 9mm Tumpangsari m1 24.45 92,800.00 2,268,960.00
30,915,885.00
V. PEKERJAAN PENGECATAN DAN PENYELESAIAN
1 Pengecatan Dinding Interior 2x Merk Vinillex m2 224.03 29,000.00 6,496,870.00
2 Pengecatan Dinding Exterior 2x Merk Vinillex m2 273.00 28,800.00 7,862,400.00
3 Pengecatan Dinding Exterior 3x Merk Vinillex m2 25.99 40,700.00 1,057,793.00
4 Pengecatan Kayu 3x Merk Seiv (pintu besi dan listplank ) m2 17.03 61,700.00 1,050,751.00
16,467,814.00
LANTAI ATAS
VI. PEKERJAAN PASANGAN
1 Lantai Keramik 30x30 Polos Merk Mulia ( Tambal Sulam ) m2 40.97 171,100.00 7,009,967.00
2 Bata Merah Besar 1/2 Bata 15 ( Diatas Folding gate ) m2 7.25 153,400.00 1,112,150.00
3 Plesteran 15 tebal 15 mm ( Perbaikan dinding retak ) m2 29.50 78,900.00 2,327,550.00
4 Acian m2 37.48 46,600.00 1,746,568.00
5 Balok Lintel 13x18 (210 kg Besi + Bekisting) K-175 m3 0.34 6,484,900.00 2,204,866.00
14,401,101.00
VII. PEKERJAAN KUSEN ALUMUNIUM
1 Pemasangan Daun Pintu Alumunium 0,8 x 2,10 m (Daun Pintu Panel Multyplek 9mm Lapis HPL) unit 4.00 999,700.00 3,998,800.00
2 Pemasangan Folding Gate m2 30.53 535,000.00 16,333,550.00
3 Pemasangan Slot jendela buah 2.00 47,000.00 94,000.00
20,426,350.00
VIII. PEKERJAAN ATAP DAN PLAFOND
1 Pemasangan Reng Baja Ringan Atap Onduline tile ( Penambahan ) m2 168.75 65,100.00 10,985,625.00
2 Atap Bitumen Onduline Tile Shaded Red uk. 1950 x 960 Monolayer 3mm m2 337.50 165,900.00 55,991,250.00
3 Nok Bitumen Selulosa Shaded Red m1 27.00 171,400.00 4,627,800.00
4 Nok Tepi Bitumen Selulosa Shaded Red m1 25.00 147,500.00 3,687,500.00
5 Listplank Capit Gunting GRC tebal 9 mm m1 4.80 92,800.00 445,440.00
6 Plafond PVC tebal 9mm Lebar 16cm + List Shunda Plafond Type MA 16050 + LS 302 m2 265.71 258,100.00 68,579,751.00
7 Rangka Plafond Hollow Galvalume 20x40 + 40x40 tb. 0,35mm ( Perkuatan Rangka Hollow Lama ) m2 106.28 62,900.00 6,685,012.00
151,002,378.00
IX. PEKERJAAN INSTALASI LISTRIK
1 Instalasi Titik Lampu Conduit Pipa PVC 5/8 titik 17.00 140,400.00 2,386,800.00
2 Instalasi Stop Kontak Conduit Pipa PVC 5/8 titik 1.00 130,600.00 130,600.00
3 Lampu LED Downlight 12 watt Type Eridani Philips buah 5.00 120,000.00 600,000.00
4 Lampu RMI In Bow 2 x 20 watt Philips buah 12.00 315,000.00 3,780,000.00
5 Stop Kontak Merk Brocco buah 1.00 29,100.00 29,100.00
6 Saklar Ganda Merk Brocco buah 1.00 32,400.00 32,400.00
6,958,900.00
X. PEKERJAAN PENGECATAN DAN PENYELESAIAN
1 Pengecatan Dinding Interior 2x Merk Vinillex m2 235.79 29,000.00 6,837,910.00
2 Pengecatan Dinding Exterior 2x Merk Vinillex m2 188.80 28,800.00 5,437,440.00
3 Pengecatan Kayu 2x Merk Seiv ( listplank dan Railling ) m2 32.88 41,600.00 1,367,808.00
4 Pengecatan Kayu 3x Merk Seiv ( Folding gate) m2 61.06 61,700.00 3,767,402.00
5 Biaya Pembersihan Lokasi Setelah Pekerjaan Selesai ls 1.00 400,000.00 400,000.00
17,810,560.00
SPESIFIKASI TEKNIS MATERIAL

Pekerjaan : Rehabilitasi Ruang Kelas SDN Puspanegara 05 Kec. Citeureup


Lokasi : Kecamatan Citeureup Kabupaten Bogor
Tahun Anggaran : 2021

NO URAIAN PEKERJAAN SPESIFIKASI TEKNIS

SESUAI DENGAN SPESIFIKASI PADA DOKUMEN PENGADAAN

Bogor, 05 Agustus 2021


Penawar,
CV. GUNADHYA TOMO MANDIRI

SEM FERDINAN GULTOM


Direktur
JADWAL PELAKSANAAN
Nama Paket Pekerjaan : Rehabilitasi Ruang Kelas SDN Puspanegara 05 Kec.
Citeureup
Lokasi Pekerjaan : Kecamatan Citeureup Kabupaten Bogor
Waktu Pelaksanaan : 90 (sembilan puluh) Hari Kalender
Tahun 2021
No Uraian Pekerjaan Bobot Bulan Ke-1 Bulan Ke-2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55

I. PEKERJAAN PERSIAPAN 2.893 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03
MOBILISASI DAN DEMOBILISASI
K3 DAN PROTOKOL KESEHATAN PENCEGAHAN COVID-19
LANTAI BAWAH
II. PEKERJAAN PASANGAN 3.906 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20
III. PEKERJAAN KUSEN ALUMUNIUM 3.276
IV. PEKERJAAN ATAP DAN PLAFOND 10.776 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27 0.27
V. PEKERJAAN PENGECATAN DAN PENYELESAIAN 5.740
LANTAI ATAS
VI. PEKERJAAN PASANGAN 5.020 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25
VII. PEKERJAAN KUSEN ALUMUNIUM 7.120
VIII. PEKERJAAN ATAP DAN PLAFOND 52.635 1.32 1.32 1.32 1.32 1.32 1.32 1.32 1.32 1.32 1.32 1.32 1.32 1.32 1.32 1.32 1.32 1.32 1.32 1.32 1.32 1.32 1.32 1.32 1.32 1.32 1.32 1.32 1.32 1.32 1.32 1.32 1.32 1.32 1.32 1.32
IX. PEKERJAAN INSTALASI LISTRIK 2.426
X. PEKERJAAN PENGECATAN DAN PENYELESAIAN 6.208

0.478

0.478

0.478

0.478

0.478

0.478

0.478

0.478

0.478

0.478

0.478

0.478

0.478

0.478

0.478

0.478

0.478

0.478

0.478

0.478

1.617

1.617

1.617

1.617

1.617

1.617

1.617

1.617

1.617

1.617

1.617

1.617

1.617

1.617

1.617

1.617

1.617

1.617

1.617

1.617

1.617

1.617

1.617

1.617

1.617

1.617

1.617

1.617

1.617

1.617

1.617

1.617

1.617

1.617

1.617
Fisik Rencana 100.000

0.478

0.957

1.435

1.914

2.392

2.871

3.349

3.828

4.306

4.784

5.263

5.741

6.220

6.698

7.177

7.655

8.134

11.19

12.80

14.42

16.04

17.66

19.27

20.89

22.51

24.13

25.74

27.36

28.98

30.60

32.21

33.83

35.45

37.06

38.68

40.30

41.92

43.53

45.15

46.77

48.39

50.00

51.62

53.24

54.86

56.47

58.09

59.71

61.33

62.94

64.56

66.18
8.61

9.09

9.57
Jumlah Fisik Rencana

Fisik Nyata

Jumlah Fisik Nyata

Deviasi

JADWAL PENGGUNAAN BAHAN


Tahun 2021
No Jenis Bahan/Material Volume Satuan Bulan Ke-1 Bulan Ke-2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55

1 Plafond PVC 265.71 m2


2 Rangka Atap Baja Ringan 36.75 m2
3 Reng Baja Ringan 168.75 m2
4 Atap Onduline Tile Shaded Red uk. 1950 x 960 Monolayer 3mm 337.50 m2
5 Nok Bitumen Selulosa Shaded Red 27.00 m1
6 Nok Tepi Bitumen Selulosa Shaded Red 25.00 m1
7 Atap U-PVC tebal 12mm Merah Maroon 84.75 m2

JADWAL PENGGUNAAN ALAT


Tahun 2021
No Nama Peralatan Merek/Tipe Kapasitas Jumlah Alat Bulan Ke-1 Bulan Ke-2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55

1 Concrete Mixer 0.3 - 0.6 M3 1 Unit


2 Concrete Vibrator 5.5 HP 1 Unit
3 Bor Listrik - 2 Unit
4 Mesin Potong Aluminium - 1 Unit
5 Mesin Potong Keramik Listrik - 1 Unit

JADWAL TENAGA KERJA


Tahun 2021
No. Personil Manajerial Bulan Ke-1 Bulan Ke-2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55

1 Pelaksana Bangunan Gedung/Pekerjaan Gedung


2 K3 Konstruksi
3 Mandor
4 Kepala Tukang
5 Tukang
6 Pekerja Biasa/Kenek
JADWAL PELAKSANAAN
Nama Paket Pekerjaan : Rehabilitasi Ruang Kelas SDN Puspanegara 05 Kec.
Citeureup
Lokasi Pekerjaan : Kecamatan Citeureup Kabupaten Bogor
Waktu Pelaksanaan : 90 (sembilan puluh) Hari Kalender
Tahun 2021
No Uraian Pekerjaan
Bulan Ke-2 Bobot Bulan Ke-3 % Ket.
56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90

I. PEKERJAAN PERSIAPAN 2.893 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 2.893
MOBILISASI DAN DEMOBILISASI
K3 DAN PROTOKOL KESEHATAN PENCEGAHAN COVID-19
LANTAI BAWAH
II. PEKERJAAN PASANGAN 3.906 3.906
III. PEKERJAAN KUSEN ALUMUNIUM 3.276 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 3.276
IV. PEKERJAAN ATAP DAN PLAFOND 10.776 0.27 0.27 0.27 0.27 0.27 10.776
V. PEKERJAAN PENGECATAN DAN PENYELESAIAN 5.740 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 5.740
LANTAI ATAS
VI. PEKERJAAN PASANGAN 5.020 5.020
VII. PEKERJAAN KUSEN ALUMUNIUM 7.120 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 0.47 7.120
VIII. PEKERJAAN ATAP DAN PLAFOND 52.635 1.32 1.32 1.32 1.32 1.32 52.635
IX. PEKERJAAN INSTALASI LISTRIK 2.426 0.49 0.49 0.49 0.49 0.49 2.426
X. PEKERJAAN PENGECATAN DAN PENYELESAIAN 6.208 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 0.41 6.208

2.103

2.103

2.103

2.103

2.103

0.725

0.725

0.725

0.725

0.725

0.725

0.725

0.725

0.725

0.725

0.725

0.725

0.725

0.725

0.725

0.829

0.829

0.829

0.829

0.829

0.829

0.829

0.829

0.829

0.829

0.829

0.829

0.829

0.829

0.829
Fisik Rencana 100.000 100.000

100.00
68.28

70.38

72.49

74.59

76.69

77.42

78.14

78.87

79.59

80.32

81.04

81.77

82.49

83.22

83.94

84.67

85.39

86.12

86.84

87.57

88.40

89.23

90.06

90.88

91.71

92.54

93.37

94.20

95.03

95.86

96.69

97.51

98.34

99.17
Jumlah Fisik Rencana

Fisik Nyata Rencana

Jumlah Fisik Nyata Realisasi

Deviasi

JADWAL PENGGUNAAN BAHAN


Tahun 2021 Keterangan
No Jenis Bahan/Material Bulan Ke-2 Volume Satuan Bulan Ke-3
56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90

1 Plafond PVC 265.71 m2


2 Rangka Atap Baja Ringan 36.75 m2
3 Reng Baja Ringan 168.75 m2
4 Atap Onduline Tile Shaded Red uk. 1950 x 960 Monolayer 3mm 337.50 m2
5 Nok Bitumen Selulosa Shaded Red 27.00 m1
6 Nok Tepi Bitumen Selulosa Shaded Red 25.00 m1
7 Atap U-PVC tebal 12mm Merah Maroon 84.75 m2

JADWAL PENGGUNAAN ALAT


Tahun 2021
No Nama Peralatan Bulan Ke-2 Merek/Tipe Kapasitas Jumlah Alat Bulan Ke-3 Keterangan
56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90

1 Concrete Mixer 0.3 - 0.6 M3 1 Unit


2 Concrete Vibrator 5.5 HP 1 Unit
3 Bor Listrik - 2 Unit
4 Mesin Potong Aluminium - 1 Unit
5 Mesin Potong Keramik Listrik - 1 Unit

JADWAL TENAGA KERJA


Tahun 2021
No. Personil
BulanManajerial
Ke-2 Bulan Ke-3 Keterangan
56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90

1 Pelaksana Bangunan Gedung/Pekerjaan Gedung


2 K3 Konstruksi
3 Mandor
4 Kepala Tukang
5 Tukang
6 Pekerja Biasa/Kenek
NETWORK PLANNING

Nama Paket Pekerjaan : Rehabilitasi Ruang Kelas SDN Puspanegara 05 Kec. Citeureup
Lokasi Pekerjaan : Kecamatan Citeureup Kabupaten Bogor
Waktu Pelaksanaan : 90 (sembilan puluh) Hari Kalender

1, 2, 3 90
H
90 90

0 4, 8 20 6, 10 60 5, 9 75 7, 12 90
A B C D E
0 20 20 40 60 15 75 15 90

0 11
F
0 5

1 PEKERJAAN PERSIAPAN
2 MOBILISASI DAN DEMOBILISASI
3 K3 DAN PROTOKOL KESEHATAN PENCEGAHAN COVID-19
LANTAI BAWAH
4 PEKERJAAN PASANGAN
5 PEKERJAAN KUSEN ALUMUNIUM
6 PEKERJAAN ATAP DAN PLAFOND
7 PEKERJAAN PENGECATAN DAN PENYELESAIAN
LANTAI ATAS
8 PEKERJAAN PASANGAN
9 PEKERJAAN KUSEN ALUMUNIUM
10 PEKERJAAN ATAP DAN PLAFOND
11 PEKERJAAN INSTALASI LISTRIK
12 PEKERJAAN PENGECATAN DAN PENYELESAIAN

Bogor, 05 Agustus 2021


Penawar,
CV. GUNADHYA TOMO MANDIRI

SEM FERDINAN GULTOM


Direktur
DAFTAR HARGA UPAH

No Uraian Upah

1 Mandor 150,300.00
2 Kepala Tukang 141,300.00
3 Kepala Tukang Batu 141,300.00
4 Kepala Tukang Kayu 141,300.00
5 Kepala Tukang Besi 141,300.00
6 Kepala Tukang Cat 141,300.00
7 Kepala Tukang Listrik 141,300.00
8 Tukang 123,300.00
9 Tukang Batu 123,300.00
10 Tukang Kayu 123,300.00
11 Tukang besi 123,300.00
12 Tukang Alumunium 123,300.00
13 Tukang Cat 123,300.00
14 Tukang Listrik 123,300.00
15 Tukang Pipa 123,300.00
16 Tukang Plitur 123,300.00
17 Tukang Taman 123,300.00
18 Pekerja 114,300.00
19 Sopir 141,300.00
20 Operator 123,300.00
21 Mekanik 123,300.00
22 Pembantu Sopir 114,300.00
23 Pembantu Operator 114,300.00
24 Pembantu Mekanik 114,300.00
HARGA SATUAN BAHAN / MATERIAL
No Bahan / Material Spesifikasi Bahan Satuan Harga

AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADINYA


1 Pasir Urug m3 200,000.00
2 Tanah Urug Pilihan m3 200,000.00
3 Pasir Pasang m3 300,000.00
4 Pasir Beton m3 300,000.00
5 Kerikil / Seplit m3 300,000.00
6 Abu Batu m3 300,000.00
7 Sirtu m3 250,000.00
8 Batu Belah m3 250,000.00
9 Batu Tempel Hitam m2 125,000.00
10 Air liter 100.00
11 Bata Merah Bata Merah Bakar setara Mercy buah 900.00
12 Paving Blok Natural 8cm m2 165,000.00
13 Paving Blok warna 8cm m2 200,000.00
14 Paving Blok Natural 6cm m2 140,000.00
15 Paving Blok warna 6cm m2 175,000.00
16 Glass Block 20x20 20x20x10 setara Mulia dus 130,000.00
17 Glass Block 30x30 30x30x10 setara Mulia dus 140,000.00
18 Rooster Beton 20x20 buah 25,000.00
19 Rooster Beton 30x30 buah 30,000.00
20 Rooster Bata Kerawang buah 27,000.00
21 Semen Portland 50 Kg kg 1,300.00
22 Semen warna kg 20,000.00
23 Alat bantu / Steger lot 2,000.00

LABURAN, PENGISI dan ALATNYA


1 Plamir kg 25,000.00
2 Cat Tembok Interior Vinillex 25 Kg kg 31,000.00
3 Cat Tembok Exterior Vinillex 25 Kg kg 40,000.00
4 Cat dasar Vinillex 25 kg kg 25,000.00
5 Cat Minyak / Genteng kg 55,000.00
6 Cat Kayu SEIV liter 75,000.00
7 Cat Besi SEIV liter 75,000.00
8 Meni Besi/Kayu kg 30,000.00
9 Politur liter 75,000.00
10 Vernis liter 52,000.00
11 Minyak cat / Afdunner kg 11,000.00
12 Cat Pelapis Anti Bocor Setara AQUAPROOF, NO DROP, DULUX Kg 61,000.00
13 Thinner Setara IMPALA Liter 33,000.00
14 Rol Cat buah 35,000.00
15 Kuas buah 20,500.00
16 Ampelas m1 6,500.00
17 Lem Kayu setara FOX kg 25,000.00
18 Sealant buah 34,000.00
19 Water Proofing Weather Shield setara Fosroc/Sika/Aquaproof kg 75,000.00
-
BAHAN KAYU BERIKUT BAHAN JADINYA -
1 Bambu ø 5 - 6 Panjang 6 m batang 15,000.00
2 Bambu ø 6 - 10 Panjang 6 m batang 18,000.00
3 List kayu 1/4 cm 1 cm m1 5,000.00
4 List Kayu Profil 4 cm 4 cm m1 25,000.00
5 Kayu 4/6 m3 4,000,000.00
6 Kayu 5/7 m3 4,000,000.00
7 Tali Ijuk kg 48,000.00
8 Ijuk ikat 23,500.00
9 Kayu Papan Kelas II Kelas II m3 2,500,000.00
10 Kayu Balok Kelas II Kelas II m3 2,500,000.00
11 Kayu papan Kelas III Kelas III m3 2,100,000.00
12 Kayu Balok Kelas III Kelas III m3 2,100,000.00
No Bahan / Material Spesifikasi Bahan Satuan Harga

-
BAHAN PENUTUP RANGKA PLAFOND -
1 GRC (120 x 240) cm, t = 4 mm lembar 72,000.00
2 Gypsum Board 120 x 240 x 9 mm lembar 75,000.00
3 List Gypsum Panjang 2m m1 15,000.00
4 Tepung Gypsum kg 12,000.00
5 Cotton Plester buah 24,000.00
6 Coumpound zak 88,000.00
7 Plafond PVC tb. 9mm Setara Shunda Plafond (16x0,9 cm) m1 29,000.00
8 List Sudut Plafond PVC Setara Shunda Plafond m1 20,750.00
9 List Sambungan Plafond PVC Setara Shunda Plafond m1 16,000.00
-
BAHAN KAYU LAPIS -
1 Multiplek 9 mm 120 x 240 lembar 150,000.00
2 HPL (High Preassure Laminate) 120 x 240 lembar 200,000.00
-
BAHAN LANTAI DAN PELAPIS DINDING -
1 Keramik 10 x 20 Corak setara Mulia KW 1 Warna/Corak (Anti Slip) dus 70,000.00
2 Keramik 20 x 20 Corak setara Mulia KW 1 Warna/Corak (Anti Slip) dus 65,000.00
3 Keramik 20 x 20 Polos setara Mulia KW 1 DN Putih polos dus 55,000.00
4 Keramik 20 x 25 Corak setara Mulia KW 1 Warna/Corak (Anti Slip) dus 76,000.00
5 Keramik 25 x 25 Corak setara Mulia KW 1 Warna/Corak (Anti Slip) dus 65,000.00
6 Keramik 25 x 40 Corak setara Mulia KW 1 Warna/Corak (Anti Slip) dus 77,000.00
7 Keramik 30 x 30 Polos setara Mulia KW 1 DN Putih polos dus 45,000.00
8 Keramik 30 x 30 Corak setara Mulia KW 1 Warna/Corak (Anti Slip) dus 55,000.00
9 Keramik 40 x 40 Polos setara Mulia KW 1 DN Putih polos dus 65,000.00
10 Keramik 40 x 40 Corak setara Mulia KW 1 Warna / Corak (Anti Slip) dus 76,000.00
11 Keramik 60 x 60 Polos setara Mulia KW 1 DN Putih polos dus 156,000.00
12 Keramik 60 x 60 Corak setara Mulia KW 1 Warna / Corak (Anti Slip) dus 169,000.00
13 Granite 60 x 60 Granite Polis m2 495,000.00
14 Granite 30 x 60 m2 200,000.00
15 Ornamen GRC 1,500,000.00
16 Logo Kabupaten Bogor Stainless t = 30 cm 1,000,000.00
17 Logo Kabupaten Bogor Stainless t = 40 cm 1,250,000.00
-
BAHAN SALURAN AIR KOTOR / BERSIH -
1 Buis Beton 1/2 dia 20 cm 20 cm (1 m') m1 68,000.00
2 Buis Beton dia 20 cm m1 110,000.00
-
BAHAN LOGAM DAN BAHAN JADINYA -
1 Besi Beton kg 13,000.00
2 Kawat Beton kg 25,000.00
3 Besi Hollow 20x40 Galvalum t=0.35 mm (20x40, P= 4 m) btg 18,000.00
4 Besi Hollow 40x40 Galvalum t=0.35 mm (40x40, P= 4 m) btg 22,000.00
5 Besi Siku L. 30x30x3 btg 116,000.00
6 Besi Plat Strip 3 x 30mm x 6 m btg 69,000.00
7 Seng Plat BJLS 30, lebar 90cm tebal 0,30mm, Lebar 90 cm m1 71,000.00
8 Kawat Las bh 1,500.00
9 Pagar BRC + Tiang 2" Galvanize 1,20 x 2,40 dia 8 lembar 575,000.00
10 Bondek / Floordeck Galvalume 6 x 1 x 0,75 lembar 600,000.00
-
KUSEN -
1 Kusen Alumunium Natural 4" YKK 1.3 mm t = 1,3 mm (4") m1 155,000.00
2 Kusen Alumunium Natural 4" Alexindo 1.3 mm t = 1,3 mm (4") m1 100,000.00
3 Profil Alumunium Natural 6 cm m1 45,000.00
4 Profil Alumunium Natural 8 cm m1 60,000.00
5 Jalusi Alumunium m1 55,000.00
6 Spandrel Alumunium lebar 8 cm, panjang 6 m batang 175,000.00
7 Handle Alumunium buah 160,000.00
8 Handle Jendela Alumunium buah 20,000.00
9 Pintu PVC buah 400,000.00
No Bahan / Material Spesifikasi Bahan Satuan Harga

10 Rolling Door m2 350,000.00


11 Folding Gate m2 395,000.00
Kusen Pintu Besi Canal + Daun Panel Plat Besi buah
12 Rangka Hollow 40+40 1,500,000.00
-
BAHAN KACA -
1 Kaca Polos 5 mm ASAHI m2 115,000.00
-
BAHAN PAKU DAN MUR BAUT -
1 Paku 1 - 3 cm kg 20,000.00
2 Paku 4 - 7 cm kg 17,000.00
3 Paku 8 - 15 cm kg 17,000.00
4 Sekrup 1 - 3 cm 1000 pcs dus 75,000.00
5 Ramset / Dinabolt buah 5,000.00
6 Screw GRC 3/4" s.d 1" dus 75,000.00
7 Screw Gypsum 3/4" s.d 1" dus 75,000.00
8 Screw Plafond PVC 3/4" s.d 1" buah 1,200.00
9 Screw Atap Bitumen buah 1,200.00
10 Screw Atap U-PVC Screw + Capping buah 2,500.00
-
BAHAN PERPIPAAN -
1 Pipa PVC AW 1/2" 4M batang 31,500.00
2 Pipa PVC AW 3/4" 4M batang 42,800.00
3 Pipa PVC AW 1" 4M batang 58,500.00
4 Pipa PVC AW 1 1/4" 4M batang 87,500.00
5 Pipa PVC AW 1 1/2" 4M batang 100,400.00
6 Pipa PVC AW 2" 4M batang 128,500.00
7 Pipa PVC AW 2 1/2" 4M batang 187,400.00
8 Pipa PVC AW 3" 4M batang 263,900.00
9 Pipa PVC AW 4" 4M batang 437,300.00
10 Pipa PVC AW 4" Berlobang 4M batang 437,300.00
11 Pipa PVC AW 6" 4M batang 971,600.00
12 Pipa GIP 1 1/2" 6M batang 471,000.00
13 Pipa GIP 2" 6M batang 630,000.00
14 Pipa Galvanis 2" batang 630,000.00
15 Seal Tape buah 6,000.00
-
BAHAN SANITAIR -
1 Floor Drain Stainless buah 43,000.00
2 Kran 1/2" Stainless buah 35,000.00
3 Kran Wastafel Stainless buah 90,000.00
4 Kran Angsa buah 135,000.00
5 Wastafel American Standar unit 450,000.00
6 Closet Jongkok Poslin Warna American Standar unit 350,000.00
7 Closet Duduk American Standar unit 1,500,000.00
8 Urinoir American Standar unit 1,350,000.00
9 Partisi / Sekat Urinoir unit 1,200,000.00
10 Bak Fiberglass 60 x 60 cm buah 350,000.00
11 Talang PVC U-15 cm 4m batang 137,500.00
-
BAHAN ELEKTRIKAL -
1 Kabel NYM 2x2,5 Instalasi Listrik m1 7,000.00
2 Kabel NYM 3x2,5 Stop Kontak m1 12,000.00
3 MCB 1 Pase + Box Tanam buah 115,000.00
4 MCB 3 Pase + Box Tanam buah 161,400.00
5 Saklar Tunggal Brocco buah 15,000.00
6 Saklar Ganda Brocco buah 18,000.00
7 Stop Kontak Brocco buah 15,000.00
8 Lampu SL / Pijar 18 watt Philips buah 37,500.00
9 Lampu TL / Neon 20 watt Philips buah 35,000.00
10 Kap / Dudukan Lampu TL / Neon 20 Watt buah 51,300.00
No Bahan / Material Spesifikasi Bahan Satuan Harga

11 Fitting / Dudukan Lampu SL buah 15,000.00


12 Lampu TL / Neon 20 watt Lengkap set 110,000.00
13 T-Doost buah 10,100.00
14 Socket / Sambungan Conduit buah 5,700.00
15 L-Bow buah 5,700.00
16 Lasdop buah 300.00
17 Pipa Conduit PVC Ø 5/8" batang 15,000.00
18 Klem Pipa Conduit buah 1,000.00
19 Fisher + Skrup buah 600.00
20 MCB 1 Pase buah 65,000.00
21 Box MCB buah 50,000.00
-
BAHAN PENUTUP ATAP -
1 Listplank GRC 10 cm 2,4 mx10 cm x9mm lembar 30,000.00
2 Listplank GRC 20 cm 2,4 mx20 cm x9mm lembar 40,000.00
3 Listplank GRC GRC 10 cm + GRC 20 cm lembar 70,000.00
4 Genteng Metal Berpasir Setara Rainbow m2 65,000.00
5 Genteng Nok Metal Berpasir Setara Rainbow lembar 34,000.00
6 Genteng Nok Pinggir Metal Berpasir Setara Rainbow lembar 34,000.00
7 Genteng Murando Natural 18 bh buah 5,000.00
8 Genteng Murando Glazur 18 bh buah 6,000.00
9 Bubungan Murando Natural buah 12,000.00
10 Bubungan Murando Glazur buah 12,000.00
11 Genteng Nok Pinggir Morando buah 10,000.00
12 Bubungan Genteng Palentong ex. Jatiwangi buah 10,000.00
13 Genteng Palentong ex. Jatiwangi buah 3,000.00
14 Genteng Bitumen Selulosa Bitumen 1060 x 400 Monolayer 3m m2 56,500.00
15 Genteng Bitumen Memanjang Selulosa Bitumen 1950 x 960 Monolayer 3m lembar 155,000.00
16 Genteng Nok Bitumen Selulosa Bitumen Monolayer 3mm m1 95,000.00
17 Genteng Penutup Tepi Bitumen Selulosa Bitumen Monolayer 3mm m1 95,000.00
18 Genteng U-PVC m2 EFF 840 (890 mm x 12 mm ) Merah Maroon m2 180,000.00
19 Genteng U-PVC m1 EFF 840 (890 mm x 12 mm ) Merah Maroon m1 135,000.00
20 Nok U-PVC EFF 840 tebal 12 mm Merah Maroon m1 99,000.00
-
BAHAN ALAT PENGANTUNG DAN KUNCI -
1 Kunci Pintu Tanam Stainless buah 90,000.00
2 Sloot Pintu Stainless buah 38,000.00
3 Engsel Pintu Stainless 4" pasang 49,000.00
4 Engsel Jendela Stainless pasang 43,000.00
5 Handle buah 22,500.00
6 Hak Angin Stainless buah 27,000.00
7 Sloot Jendela Stainless buah 27,000.00
8 Sloot Jendela Alumunium buah 27,000.00
9 Door Closer unit 175,000.00
10 Door Stoper unit 35,000.00
11 Sloot Pintu Tanam pasang 75,000.00
12 Casement 12" pasang 93,500.00
13 Roda Sliding buah 15,000.00
-
BAHAN BAKAR DAN PELUMAS -
1 Minyak Bekisting liter 54,400.00
2 Soda Api kg 27,000.00
-
PRODUK GALVALUM TRUSS -
1 Baja Ringan (Main Truss C 75 tb. 0,75 mm) m1 12,500.00
2 Reng R-35 tb. 0,45 mm m1 5,800.00
3 Sekrup Baja Ringan buah 1,500.00
4 Sekrup Reng buah 1,200.00
5 Dinabolt buah 5,000.00

SEWA ALAT -
No Bahan / Material Spesifikasi Bahan Satuan Harga

1 Stemper jam 40,000.00


REKAPITULASI HARGA

No Kode Uraian Harga Satuan

A. HARGA SATUAN PEKERJAAN PERSIAPAN


1 A.1. Pengukuran dan pemasangan Bouwplank 72,800.00
2 A.2. Pembersihan Lapangan dan Perataan 20,900.00
3 A.3. Pembuatan Steger/perancah dari bambu 471,000.00
4 A.4. Pembongkaran Beton bertulang 1,786,600.00
5 A.5. Pembongkaran Dinding Bata 893,300.00
6 A.6. Pagar BRC + Tiang 2" 298,000.00

B. HARGA SATUAN PEKERJAAN TANAH


1 B.1. Galian Tanah Biasa Dalam 1 m 98,500.00
2 B.2. Galian Tanah Biasa Dalam 2 m 120,600.00
3 B.3. Galian Tanah Biasa Dalam 3 m 143,100.00
4 B.4. Galian Tanah Keras Dalam 1 m 131,100.00
5 B.5. Galian Tanah Lumpur Dalam 1 m 158,400.00
6 B.6. Stripping Tanah Tebing Tinggi 1 m 7,200.00
7 B.7. Pembuangan Tanah Jarak ± 30 m 43,200.00
8 B.8. Urugan Kembali Galian Tanah 71,200.00
9 B.9. Urugan + Pemadatan Tanah 93,800.00
10 B.10. Urugan Pasir 303,400.00
11 B.11. Urugan Lapisan Ijuk Bidang Resapan 176,500.00
12 B.12. Urugan Tanah Dari Luar 299,600.00
13 B.13. Urugan Abu Batu 431,600.00
14 B.14. Cerucuk Bambu 89,800.00
15 B.15. Sulingan 2" + Ijuk 41,600.00
16 B.16. Urugan Sirtu 365,600.00

C. HARGA SATUAN PEKERJAAN PONDASI


1 C.1. Pondasi Batu Belah 1:3 1,093,300.00
2 C.2. Pondasi Batu Belah 1:4 1,049,100.00
3 C.3. Pondasi Batu Belah 1:5 1,018,400.00
4 C.4. Batu Kosong (Anstamping) 588,600.00
5 C.5. Pondasi Siklop 60% Beton 1:2:3 dan 40 % Batu Belah 3,102,300.00
6 C.6. Pondasi Sumuran ø 1 m 1,101,000.00

D. HARGA SATUAN PEKERJAAN BETON


1 D.1. Beton Mutu K-100 1,088,900.00
2 D.2. Beton Mutu K-125 1,123,700.00
3 D.3. Beton Mutu K-150 1,151,000.00
4 D.4. Beton Mutu K-175 1,177,400.00
5 D.5. Beton Mutu K-200 1,207,700.00
6 D.6. Beton Mutu K-225 1,227,100.00
7 D.7. Beton Mutu K-250 1,252,800.00
8 D.8. Beton Mutu K-100 (1:3:5) 1,003,700.00
9 D.9. Pembesian 10 Kg Besi Polos / Ulir 174,400.00
10 D.9.Hit-a Pembesian 1 Kg Besi Polos / Ulir 17,500.00
11 D.10. Pondasi Beton (150 kg Besi + Bekisting) K-175 4,718,400.00
12 D.10.Hit-a Pondasi Beton (150 kg Besi + Bekisting) K-225 4,768,100.00
13 D.11. Tangga Beton (200 kg Besi + Bekisting) K-175 5,761,500.00
No Kode Uraian Harga Satuan

14 D.12. Sloof 15x18 (201 kg Besi + Bekisting) K-175 5,800,400.00


15 D.13. Sloof 15x20 (180 kg Besi + Bekisting) K-225 5,529,000.00
16 D.14. Sloof 20x30 (201 kg Besi + Bekisting) K-175 6,461,500.00
17 D.14.Hit-a Sloof 20x30 (201 kg Besi + Bekisting) K-225 6,490,400.00
18 D.15. Kolom 12x12 (239 kg Besi + Bekisting) K-175 7,021,400.00
19 D.16. Kolom 13x18 (200 kg Besi + Bekisting) K-175 6,417,500.00
20 D.17. Kolom 18x18 (172 kg Besi + Bekisting) K-175 5,974,100.00
21 D.18. Kolom 20x20 (210 kg Besi + Bekisting) K-175 6,614,600.00
22 D.18.Hit-a Kolom 20x20 (210 kg Besi + Bekisting) K-225 6,629,200.00
23 D.19. Kolom 20x20 (140 kg Besi + Bekisting) K-175 5,599,300.00
24 D.20. Kolom 30x30 (175 kg Besi + Bekisting) K-175 5,874,100.00
25 D.20.Hit-a Kolom 30x30 (175 kg Besi + Bekisting) K-225 5,903,000.00
26 D.21. Balok 11x11 (278 kg Besi + Bekisting) K-175 7,638,100.00
27 D.22. Balok Topi Beton 12x15 (215 kg Besi + Bekisting) K-175 6,737,200.00
28 D.23. Balok 13x18 (210 kg Besi + Bekisting) K-175 6,355,600.00
29 D.24. Balok 15x25 (175 kg Besi + Bekisting) K-175 5,855,100.00
30 D.25. Balok Portal 13x18 (210 kg Besi + Bekisting) K-175 6,484,900.00
31 D.26. Balok 20x30 (175 kg Besi + Bekisting) K-225 6,429,100.00
32 D.26.Hit-a Balok 20x30 (175 kg Besi + Bekisting) K-175 6,379,300.00
33 D.27. Balok 30x60 (125 kg Besi + Bekisting) K-225 5,666,600.00
34 D.28. Plat Beton tb. 12cm (110 kg Besi + Bekisting) K-225 4,886,200.00
35 D.28.Hit-a Plat Beton tb. 12cm (110 kg Besi + Bekisting Bondek) K-225 4,990,800.00
36 D.28.Hit-b Plat Beton tb. 12cm (110 kg Besi + Bekisting) K-175 4,816,100.00
37 D.29. Plat Beton tb. 8cm (50 kg besi + Bekisting) K-175 3,427,100.00
38 D.29.Hit-a Plat Beton tb. 8cm (50 kg besi + Bekisting) K-225 3,456,000.00
39 D.30. Dinding Beton (150 kg Besi + Bekisting) K-175 5,583,400.00
40 D.31. Dinding Beton (200 kg Besi + Bekisting) K-175 6,038,200.00

D1. HARGA SATUAN PEKERJAAN BEKISTING


1 D1.1. Bekisting Pondasi 213,000.00
2 D1.2. Bekisting Sloof 224,600.00
3 D1.3. Bekisting Kolom 375,600.00
4 D1.4. Bekisting Balok 382,600.00
5 D1.5. Bekisting Plat Lantai 441,600.00
6 D1.6. Bekisting Dinding 380,600.00
7 D1.7. Bekisting Tangga 349,500.00

E. HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM


1 E.1. Pengelasan Las Listrik 1 cm 1,300.00
2 E.2. Pemasangan Folding Gate 468,800.00
3 E.3. Pemasangan Rolling door 413,600.00
4 E.4. Pemasangan Kusen Alumunium 36,000.00
5 E.5. Pemasangan Talang Datar Seng BJLS 30 181,800.00
6 E.6. Pemasangan Talang datar PVC U-15 cm (AW) 130,900.00
7 E.7. Grill Besi Penutup Saluaran 282,700.00
8 E.8. Pemasangan Pintu Besi Canal C + Daun Pintu Panel Plat Besi Rangka Hollow 40x40 1,682,700.00

F. HARGA SATUAN PEKERJAAN DINDING


1 F.1. Bata Merah 1 Bata 1:3 326,400.00
2 F.2. Bata Merah 1 Bata 1:5 314,700.00
No Kode Uraian Harga Satuan

3 F.3. Bata Merah 1/2 Bata 1:3 158,400.00


4 F.4. Bata Merah 1/2 Bata 1:5 153,400.00
5 F.5. Dinding Partisi Double GRC 4mm + Rangka Baja Ringan 288,000.00

G. HARGA SATUAN PEKERJAAN PLESTERAN


1 G.1. Plesteran 1:3 tebal 15mm 81,600.00
2 G.2. Plesteran 1:5 tebal 15 mm 78,900.00
3 G.3. Plesteran 1:3 tebal 20 mm 90,200.00
4 G.4. Plesteran 1:5 tebal 20 mm 105,600.00
5 G.5. Plesteran Skoneng 1:3 lebar 10 cm 76,200.00
6 G.6. Plesteran Ciprat 1:2 63,500.00
7 G.7. Siar Batu Kali 1:2 76,000.00
8 G.8. Acian 46,600.00

H. HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN DINDING


1 H.1. Lantai Keramik 30x30 Polos (Bahan dan Merk Sesuai RKS) 171,100.00
2 H.2. Lantai Keramik 30x30 Corak Anti Slip (Bahan dan Merk Sesuai RKS) 183,200.00
3 H.3. Lantai Keramik 40x40 Polos (Bahan dan Merk Sesuai RKS) 188,700.00
No Kode Uraian Harga Satuan

4 H.4. Lantai Keramik 20x20 Corak Anti Slip (Bahan dan Merk Sesuai RKS) 198,600.00
5 H.5. Dinding Keramik 20x25 Corak (Bahan dan Merk Sesuai RKS) 342,600.00
6 H.5.Hit-a Dinding Granite 30x60 Corak (Bahan dan Merk Sesuai RKS) 492,600.00
7 H.6. Dinding keramik 10cm x 20cm Corak setara Mulia 335,500.00
8 H.7. Dinding Batu Tempel Hitam 273,200.00
9 H.8. Paving Block Natural 8cm 330,700.00
10 H.9. Paving Block Warna 8cm 373,100.00
11 H.10. Paving Block Natural 6cm 300,500.00
12 H.11. Paving Block Warna 6cm 342,800.00
13 H.11.Hit-a Pemasangan Paving Block Existing 103,600.00

I. HARGA SATUAN PEKERJAAN PLAFOND


1 I.1. Plafond Gypsum (Bahan dan Merk Sesuai RKS)+ Rangka Kayu 202,500.00
2 I.2. Plafond Gypsum (Bahan dan Merk Sesuai RKS) + Rangka Hollow 109,100.00
3 I.3. Plafond GRC tebal 4mm (Bahan dan Merk Sesuai RKS) + Rangka Kayu 215,000.00
4 I.4. Plafond GRC tebal 4mm (Bahan dan Merk Sesuai RKS) + Rangka Hollow 107,900.00
5 I.5. Plafond PVC tebal 9mm + List (Bahan dan Merk Sesuai RKS) 258,100.00
6 I.6. Rangka Plafond Hollow Galvalume 20x40 + 40x40 62,900.00
7 I.7. List Plafond Kayu 1x4 cm 20,400.00
8 I.8. List Plafond Kayu profil 4 cm 43,500.00
9 I.9. List Plafond Gypsum 31,800.00
10 I.10. Listplank GRC tebal 9mm Tumpangsari 92,800.00
11 I.11. Listplank Capit Gunting GRC tebal 9 mm 92,800.00

J. HARGA SATUAN PEKERJAAN PENUTUP ATAP


1 J.1. Atap Palentong 114,100.00
2 J.2. Atap Morando Natural 130,600.00
3 J.3. Atap Morando Glazur 150,400.00
4 J.4. Atap Metal Roof Berpasir (Bahan dan Merk Sesuai RKS) 135,500.00
5 J.5. Atap Bitumen Selulosa Shaded Red (Bahan dan Merk Sesuai RKS) 261,400.00
6 J.5.Hit-a Atap Bitumen Bergelombang Memanjang Shaded Red (Bahan dan Merk Sesuai RKS) 165,900.00
7 J.6. Atap U-PVC tebal 12mm Merah Maroon (Bahan dan Merk Sesuai RKS) 264,300.00
8 J.7. Nok Palentong 157,900.00
9 J.8. Nok Morando Natural 119,600.00
10 J.9. Nok Morando Glazur 119,600.00
11 J.10. Nok Metal Roof Berpasir (Bahan dan Merk Sesuai RKS) 97,800.00
12 J.11. Nok Bitumen Selulosa Shaded Red (Bahan dan Merk Sesuai RKS) 171,400.00
13 J.12. Nok U-PVC tebal 12mm Merah Maroon (Bahan dan Merk Sesuai RKS) 153,000.00
14 J.13. Nok Tepi Morando 112,200.00
15 J.14. Nok Tepi Bitumen Selulosa Shaded Red (Bahan dan Merk Sesuai RKS) 147,500.00
16 J.15. Kuda-Kuda Baja Ringan (Lolos Verifikasi PUPR sesuai RKS) 170,000.00
17 J.16. Pemasangan Reng Baja Ringan 65,100.00

K. HARGA SATUAN PEKERJAAN KAYU


1 K.1. Daun Pintu Panel Multyplek tb 9mm, Rangka kayu kelas II 498,000.00
2 K.2. Daun Pintu Panel Multyplek 9mm, Rangka Alumunium 770,800.00
3 K.3. Daun Pintu Panel Spandrel Alumunium, Rangka Alumunium 1,273,200.00
4 K.4. Daun Pintu Panel Multyplek 9mm Lapis HPL, Rangka Alumunium 951,200.00
5 K.5. Rangka Plafond (60 x 60), Kayu Kelas II 121,700.00
No Kode Uraian Harga Satuan

L. HARGA SATUAN PEKERJAAN PENGECATAN


1 L.1. Pengerokan Cat Lama 20,900.00
2 L.2. Pengecatan Kayu 2x (Bahan dan Merk Sesuai RKS) 41,600.00
3 L.3. Pengecatan Kayu 3x (Bahan dan Merk Sesuai RKS) 61,700.00
4 L.4. Pengecatan Dinding Interior 2x (Bahan dan Merk Sesuai RKS) 29,000.00
5 L.5. Pengecatan Dinding Interior 3x (Bahan dan Merk Sesuai RKS) 39,600.00
6 L.6. Pengecatan Dinding Exterior 2x (Bahan dan Merk Sesuai RKS) 28,800.00
7 L.7. Pengecatan Dinding Exterior 3x (Bahan dan Merk Sesuai RKS) 40,700.00
8 L.8. Pengecatan Dinding Lama 2x (Bahan dan Merk Sesuai RKS) 23,700.00
9 L.9. Pengecatan Plafond 2x (Bahan dan Merk Sesuai RKS) 56,300.00
10 L.10. Pengecatan Plafond 3x (Bahan dan Merk Sesuai RKS) 84,300.00
11 L.11. Pengecatan Vernis 55,100.00
12 L.12. Pengecatan Waterproofing 3x (Bahan dan Merk Sesuai RKS) 82,200.00

M. HARGA SATUAN PEKERJAAN SANITAIR


1 M.1. Pemasangan Closet Duduk (Bahan dan Merk Sesuai RKS) 1,815,800.00
2 M.2. Pemasangan Closet Jongkok (Bahan dan Merk Sesuai RKS) 434,800.00
3 M.3. Pemasangan Urinoir (Bahan dan Merk Sesuai RKS) 1,611,600.00
4 M.3.Hit-a Pemasangan Partisi / Sekat Urinoir (Bahan dan Merk Sesuai RKS) 1,427,800.00
5 M.4. Pemasangan Wastafel (Bahan dan Merk Sesuai RKS) 562,800.00
6 M.5. Pemasangan Bak Fiberglass (Bahan dan Merk Sesuai RKS) 432,200.00
7 M.6. Pemasangan Floor drain (Bahan dan Merk Sesuai RKS) 64,600.00
8 M.7. Pemasangan Kran 1/2 " (Bahan dan Merk Sesuai RKS) 55,900.00
9 M.8. Pemasangan Pipa PVC 1/2” 28,000.00
10 M.9. Pemasangan Pipa PVC 3/4” 33,000.00
11 M.10. Pemasangan Pipa PVC 1” 31,900.00
12 M.11. Pemasangan pipa PVC 1 1/2” 65,700.00
13 M.12. Pemasangan pipa PVC 2” 78,200.00
14 M.13. Pemasangan Pipa PVC 3” 148,900.00
15 M.14. Pemasangan Pipa PVC 4" 226,100.00
16 M.15. Saluran Air Hujan Buis Beton 1/2 Ø 20 cm 206,000.00
17 M.15.Hit-a Saluran Air Hujan Buis Beton Ø 20 cm 256,800.00
18 M.16. Saluran Air Hujan Bata Merah lebar 20cm 150,400.00
19 M.17. Septictank 1 x 1,50 x 1,50 m + Rembesan 5,816,900.00
20 M.18. Pemasangan Pipa GIP 1 1/2" 181,600.00
21 M.19. Pemasangan Pipa GIP 2" 234,000.00
22 M.19.Hit-a Pemasangan Pipa Galvanis 2" 234,000.00
23 M.20. Pemasangan Pintu PVC KM/WC 483,500.00

N. HARGA SATUAN PEKERJAAN KUNCI DAN KACA


1 N.1. Pemasangan Kunci Tanam 176,700.00
2 N.2. Pemasangan Engsel pintu 79,800.00
3 N.3. Pemasangan Engsel jendela 64,600.00
4 N.4. Pemasangan Slot jendela 47,000.00
5 N.5. Pemasangan Kait angin 55,600.00
6 N.6. Pemasangan Door closer 274,900.00
7 N.7. Pemasangan Door stoper 55,800.00
8 N.8. Pemasangan Kaca tebal 5 mm 165,800.00

O. HARGA SATUAN PEKERJAAN KUSEN ALUMUNIUM


No Kode Uraian Harga Satuan

1 O.1. Kusen Partisi Alm 2,20x1,60 m, Daun Multiplek 9 mm + Rangka Alumunium 2,089,100.00
2 O.1.Hit-a Daun Partisi Multiplek 9 mm, Rangka Alumunium 1,211,300.00
3 O.2. Kusen Jendela Alumunium 0,70 x 1,60 m (1 lubang dgn 1 Daun Jendela) 1,198,600.00
4 O.3. Kusen Jendela Alumunium 1,35 x 1,60 m (2 lubang dgn 1 Daun Jendela) 1,698,900.00
5 O.3.Hit-a Kusen Jendela Sliding Alumunium 1,35 x 1,60 m (2 lubang 2 daun) 1,746,500.00
6 O.4. Kusen Jendela Alumunium 2,00 x 1,60 m (3 lubang dgn 2 Daun Jendela) 2,453,500.00
7 O.4.Hit-a Kusen Jendela Sliding Alumunium 2,00 x 1,60 m (3 lubang 2 Daun) 2,206,900.00
8 O.5. Kusen Jendela Alumunium 2,65 x 1,60 m (4 lubang dgn 2 Daun Jendela) 2,953,800.00
9 O.5.Hit-a Kusen Jendela Sliding Alumunium 2,65 x 1,60 m (4 lubang 2 Daun) 2,707,200.00
10 O.6. Kusen Bouvenligh Alumunium 0,70 x 0,70 m (1 lubang) 542,300.00
11 O.7. Kusen Bouvenligh Alumunium 1,35 x 0,70 m (2 lubang) 815,200.00
12 O.8. Kusen Bouvenligh Alumunium 2,00 x 0,70 m (3 lubang) 1,123,700.00
13 O.9. Kusen Bouvenligh Alumunium 2,65 x 0,70 m (4 lubang) 1,389,200.00
14 O.10. Kusen Alumunium Sopi - sopi 1,279,600.00
15 O.11. Kusen Pintu Alumunium 0,9 x 2,8 m (Daun Pintu Panel Multyplek 9mm) 2,024,800.00
16 O.11.Hit-a Kusen Pintu Alumunium 0,9 x 2,8 m (Daun Pintu Panel Spandrel Alumunium) 2,527,300.00
17 O.11.Hit-b Pemasangan Daun Pintu Alumunium (Daun Pintu Panel Multyplek 9mm) 999,700.00
18 O.11.Hit-c Kusen Pintu Alumunium 0,9 x 2,0 m (Daun Pintu Panel Multyplek 9mm) 1,680,300.00
19 O.12. Kusen Pintu Alumunium 1,7 x 2,8 m (Daun Pintu Panel Multyplek Lapis HPL) 3,842,700.00
20 O.12.Hit-a Kusen Pintu Alumunium 1,7 x 2,8 m (Daun Pintu Panel Multyplek) 3,481,900.00
21 O.12.Hit-b Kusen Pintu Alumunium 1,5 x 2,60 m (Daun Pintu Panel Multyplek Lapis HPL) 3,680,924.92
22 O.13. Kusen Pintu & Jendela Alm 1,55 x 2,80 m (1 lb. Pintu + 1 lb. Jendela Mati) 2,719,500.00
23 O.14. Kusen Pintu & Jendela Alm 2,20 x 2,80 m (1 lb. Pintu + 2 lb. 1 Daun Jendela) 3,475,400.00
24 O.14.Hit-a Kusen Pintu & Jendela Sliding Alm 2,20 x 2,80 m (1 lb. Pintu + 2 lb 2 Daun) 3,483,100.00
25 O.15. Kusen Pintu & Jendela Alm 2,85 x 2,80 m (1 lb. Pintu + 3 lb. 2 Daun Jendela) 4,301,100.00
26 O.15.Hit-a Kusen Pintu & Jendela Sliding Alm 2,85 x 2,80 m (1 lb. Pintu + 3 lb. 2 Daun) 4,054,500.00
27 O.16. Penambahan & Pemasangan Kembali Kusen Alumunium Existing 345,700.00
28 O.17. Pemasangan Kembali Kusen Alumunium Existing 206,100.00

P. HARGA SATUAN LUMP SUM (LS)


1 P.1. Biaya Pembuatan Papan Proyek 175,000.00
2 P.2. Biaya Mobilisasi / Demobilisasi 1,000,000.00
3 P.3. Biaya Bongkaran 2,500,000.00
4 P.4. Biaya Pengadaan Listrik dan Air Kerja 1,000,000.00
5 P.5. Biaya Administrasi dan Dokumentasi 1,000,000.00
6 P.6. Biaya Pengadaan Alat Bantu / Prancah 1,500,000.00
7 P.7. Biaya Uji Beton 2,500,000.00
8 P.8. Biaya Penyambungan Kembali Listrik 500,000.00
9 P.9. Pagar Relling Tangga Rangka Hollow 500,000.00
10 P.10. Hand Relling Pipa Stainless 2" 350,000.00
11 P.11. Canopy Polycarbonate + Rangka Besi Hitam 650,000.00
12 P.12. Canopy Polycarbonate + Rangka Pipa Stainless 850,000.00
13 P.13. Biaya Pembersihan Lokasi Setelah Pekerjaan Selesai 500,000.00
14 P.14. Biaya Buang Puing 2,500,000.00
15 P.15. Biaya Penutup Tangga Sementara (Atap Asbes + Rangka Kayu) 1,000,000.00
16 P.16. Biaya K3 2,000,000.00
17 P.17. Biaya Sparing Instalasi Listrik 750,000.00
18 P.18. Pagar Relling Tangga Stainless 2" 500,000.00
19 P.19. Ornamen GRC Pohon Kawung Pabrikasi t= 100 cm 1,000,000.00
20 P.20. Ornamen GRC Pohon Kawung Pabrikasi t= 50 cm 750,000.00
No Kode Uraian Harga Satuan

21 P.21. Logo Kabupaten Bogor Stainless t = 30 cm 500,000.00


22 P.22. Logo Kabupaten Bogor Stainless t = 40 cm 750,000.00

Q. HARGA SATUAN PEKERJAAN ELEKTRIKAL


1 Q.1. Instalasi Titik Lampu Conduit Pipa PVC Ø 5/8" 140,400.00
2 Q.2. Instalasi Stop Kontak Conduit Pipa PVC Ø 5/8" 130,600.00
3 Q.3. Lampu SL 18 Watt 70,400.00
4 Q.4. Lampu TL 20 Watt 107,600.00
5 Q.5. Stop Kontak 29,100.00
6 Q.6. Saklar Tunggal 29,100.00
7 Q.7. Saklar Ganda 32,400.00
8 Q.8. MCB 1 Phase + Box 139,100.00
A. HARGA SATUAN PEKERJAAN PERSIAPAN

Jenis Pekerjaan : Pengukuran dan pemasangan Bouwplank


Satuan : 1 m1
Kode : A.1.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.100 114,300.00 11,430.00
Tukang Kayu L.02 OH 0.100 123,300.00 12,330.00
Kepala Tukang L.03 OH 0.010 141,300.00 1,413.00
Mandor L.04 OH 0.005 150,300.00 751.50
Jumlah Tenaga 25,924.50
B BAHAN
Kayu Balok Kelas III m3 0.012 2,100,000.00 25,200.00
Paku 4 - 7 cm Kg 0.020 17,000.00 340.00
Kayu papan kelas III m3 0.007 2,100,000.00 14,700.00
Jumlah Harga 40,240.00
C PERALATAN

Jumlah Alat

D JUMLAH (A+B+C) 66,164.50


E OVERHEAD & PROFIT 10% x D 6,616.45
F JUMLAH HARGA PEKERJAAN (D+E) 72,780.95
G PEMBULATAN 72,800.00

Jenis Pekerjaan : Pembersihan Lapangan dan Perataan


Satuan : 1 m2
Kode : A.2.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.100 114,300.00 11,430.00
Mandor L.04 OH 0.050 150,300.00 7,515.00
Jumlah Tenaga 18,945.00
B BAHAN

Jumlah Harga
C PERALATAN

Jumlah Alat

D JUMLAH (A+B+C) 18,945.00


E OVERHEAD & PROFIT 10% x D 1,894.50
F JUMLAH HARGA PEKERJAAN (D+E) 20,839.50
G PEMBULATAN 20,900.00

Jenis Pekerjaan : Pembuatan Steger/perancah dari bambu


Satuan : 1 m2
Kode : A.3.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 1.000 114,300.00 114,300.00
Tukang Kayu L.02 OH 2.000 123,300.00 246,600.00
Kepala Tukang L.03 OH 0.200 141,300.00 28,260.00
Mandor L.04 OH 0.050 150,300.00 7,515.00
Jumlah Tenaga 396,675.00
B BAHAN
Bambu ø 6 - 10 Batang 1.250 18,000.00 22,500.00
Tali ijuk m3 0.186 48,000.00 8,928.00
Jumlah Harga 31,428.00
C PERALATAN

Jumlah Alat

D JUMLAH (A+B+C) 428,103.00


E OVERHEAD & PROFIT 10% x D 42,810.30
F JUMLAH HARGA PEKERJAAN (D+E) 470,913.30
G PEMBULATAN 471,000.00

Jenis Pekerjaan : Pembongkaran Beton bertulang


Satuan : 1 m3
Kode : A.4.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 13.334 114,300.00 1,524,076.20
Mandor L.04 OH 0.666 150,300.00 100,099.80
Jumlah Tenaga 1,624,176.00
B BAHAN

Jumlah Harga
C PERALATAN

Jumlah Alat

D JUMLAH (A+B+C) 1,624,176.00


E OVERHEAD & PROFIT 10% x D 162,417.60
F JUMLAH HARGA PEKERJAAN (D+E) 1,786,593.60
G PEMBULATAN 1,786,600.00

Jenis Pekerjaan : Pembongkaran Dinding Bata


Satuan : 1 m2
Kode : A.5.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 6.667 114,300.00 762,038.10
Mandor L.04 OH 0.333 150,300.00 50,049.90
Jumlah Tenaga 812,088.00
B BAHAN

Jumlah Harga
C PERALATAN

Jumlah Alat

D JUMLAH (A+B+C) 812,088.00


E OVERHEAD & PROFIT 10% x D 81,208.80
F JUMLAH HARGA PEKERJAAN (D+E) 893,296.80
G PEMBULATAN 893,300.00

Jenis Pekerjaan : Pagar BRC + Tiang 2"


Satuan : 1 M2
Kode : A.6.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.375 114,300.00 42,862.50
Tukang Batu L.02 OH 0.125 123,300.00 15,412.50
Kepala Tukang L.03 OH 0.012 141,300.00 1,695.60
Mandor L.04 OH 0.019 150,300.00 2,855.70
Jumlah Tenaga 62,826.30
B BAHAN
Pagar BRC + Tiang 2" Lmbr 0.350 575,000.00 201,250.00
Semen Portland Kg 2.000 1,300.00 2,600.00
Pasir Beton M3 0.005 300,000.00 1,500.00
Kerikil / Seplit M3 0.009 300,000.00 2,700.00
Jumlah Harga 208,050.00
C PERALATAN

Jumlah Alat

D JUMLAH (A+B+C) 270,876.30


E OVERHEAD & PROFIT 10% x D 27,087.63
F JUMLAH HARGA PEKERJAAN (D+E) 297,963.93
G PEMBULATAN 298,000.00
B. HARGA SATUAN PEKERJAAN TANAH

Jenis Pekerjaan : Galian Tanah Biasa Dalam 1 m


Satuan : 1 m3
Kode : B.1.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.750 114,300.00 85,725.00
Mandor L.04 OH 0.025 150,300.00 3,757.50
Jumlah Tenaga 89,482.50
B BAHAN

Jumlah Bahan
C PERALATAN

Jumlah Alat

D JUMLAH (A+B+C) 89,482.50


E OVERHEAD & PROFIT 10% x D 8,948.25
F JUMLAH HARGA PEKERJAAN (D+E) 98,430.75
G PEMBULATAN 98,500.00

Jenis Pekerjaan : Galian Tanah Biasa Dalam 2 m


Satuan : 1 m3
Kode : B.2.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.900 114,300.00 102,870.00
Mandor L.04 OH 0.045 150,300.00 6,763.50
Jumlah Tenaga 109,633.50
B BAHAN

Jumlah Bahan
C PERALATAN

Jumlah Alat

D JUMLAH (A+B+C) 109,633.50


E OVERHEAD & PROFIT 10% x D 10,963.35
F JUMLAH HARGA PEKERJAAN (D+E) 120,596.85
G PEMBULATAN 120,600.00

Jenis Pekerjaan : Galian Tanah Biasa Dalam 3 m


Satuan : 1 m3
Kode : B.3.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 1.050 114,300.00 120,015.00
Mandor L.04 OH 0.067 150,300.00 10,070.10
Jumlah Tenaga 130,085.10
B BAHAN

Jumlah Bahan
C PERALATAN

Jumlah Alat

D JUMLAH (A+B+C) 130,085.10


E OVERHEAD & PROFIT 10% x D 13,008.51
F JUMLAH HARGA PEKERJAAN (D+E) 143,093.61
G PEMBULATAN 143,100.00

Jenis Pekerjaan : Galian Tanah Keras Dalam 1 m


Satuan : 1 m3
Kode : B.4.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 1.000 114,300.00 114,300.00
Mandor L.04 OH 0.032 150,300.00 4,809.60
Jumlah Tenaga 119,109.60
B BAHAN

Jumlah Bahan
C PERALATAN

Jumlah Alat

D JUMLAH (A+B+C) 119,109.60


E OVERHEAD & PROFIT 10% x D 11,910.96
F JUMLAH HARGA PEKERJAAN (D+E) 131,020.56
G PEMBULATAN 131,100.00

Jenis Pekerjaan : Galian Tanah Lumpur Dalam 1 m


Satuan : 1 m3
Kode : B.5.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 1.200 114,300.00 137,160.00
Mandor L.04 OH 0.045 150,300.00 6,763.50
Jumlah Tenaga 143,923.50
B BAHAN

Jumlah Bahan
C PERALATAN

Jumlah Alat

D JUMLAH (A+B+C) 143,923.50


E OVERHEAD & PROFIT 10% x D 14,392.35
F JUMLAH HARGA PEKERJAAN (D+E) 158,315.85
G PEMBULATAN 158,400.00

Jenis Pekerjaan : Stripping Tanah Tebing Tinggi 1 m


Satuan : 1 m2
Kode : B.6.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.050 114,300.00 5,715.00
Mandor L.04 OH 0.005 150,300.00 751.50
Jumlah Tenaga 6,466.50
B BAHAN

Jumlah Bahan
C PERALATAN

Jumlah Alat

D JUMLAH (A+B+C) 6,466.50


E OVERHEAD & PROFIT 10% x D 646.65
F JUMLAH HARGA PEKERJAAN (D+E) 7,113.15
G PEMBULATAN 7,200.00

Jenis Pekerjaan : Pembuangan Tanah Jarak ± 30 m


Satuan : 1 m3
Kode : B.7.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.330 114,300.00 37,719.00
Mandor L.04 OH 0.010 150,300.00 1,503.00
Jumlah Tenaga 39,222.00
B BAHAN

Jumlah Bahan
C PERALATAN

Jumlah Alat

D JUMLAH (A+B+C) 39,222.00


E OVERHEAD & PROFIT 10% x D 3,922.20
F JUMLAH HARGA PEKERJAAN (D+E) 43,144.20
G PEMBULATAN 43,200.00

Jenis Pekerjaan : Urugan Kembali Galian Tanah


Satuan : 1 m3
Kode : B.8.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.500 114,300.00 57,150.00
Mandor L.04 OH 0.050 150,300.00 7,515.00
Jumlah Tenaga 64,665.00
B BAHAN

Jumlah Bahan
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 64,665.00
E OVERHEAD & PROFIT 10% x D 6,466.50
F JUMLAH HARGA PEKERJAAN (D+E) 71,131.50
G PEMBULATAN 71,200.00

Jenis Pekerjaan : Urugan + Pemadatan Tanah


Satuan : 1 m3
Kode : B.9.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.500 114,300.00 57,150.00
Mandor L.04 OH 0.050 150,300.00 7,515.00
Jumlah Tenaga 64,665.00
B BAHAN

Jumlah Bahan
C PERALATAN
Stemper Jam 0.486 42,400.00 20,606.40
Jumlah Alat
D JUMLAH (A+B+C) 85,271.40
E OVERHEAD & PROFIT 10% x D 8,527.14
F JUMLAH HARGA PEKERJAAN (D+E) 93,798.54
G PEMBULATAN 93,800.00
Jenis Pekerjaan : Urugan Pasir
Satuan : 1 m3
Kode : B.10.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.300 114,300.00 34,290.00
Mandor L.04 OH 0.010 150,300.00 1,503.00
Jumlah Tenaga 35,793.00
B BAHAN
Pasir Urug 1.200 200,000.00 240,000.00
Jumlah Bahan 240,000.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 275,793.00
E OVERHEAD & PROFIT 10% x D 27,579.30
F JUMLAH HARGA PEKERJAAN (D+E) 303,372.30
G PEMBULATAN 303,400.00

Jenis Pekerjaan : Urugan Lapisan Ijuk Bidang Resapan


Satuan : 1 m2
Kode : B.11.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.150 114,300.00 17,145.00
Mandor L.04 OH 0.015 150,300.00 2,254.50
Jumlah Tenaga 19,399.50
B BAHAN
Ijuk m3 6.000 23,500.00 141,000.00
Jumlah Bahan 141,000.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 160,399.50
E OVERHEAD & PROFIT 10% x D 16,039.95
F JUMLAH HARGA PEKERJAAN (D+E) 176,439.45
G PEMBULATAN 176,500.00

Jenis Pekerjaan : Urugan Tanah Dari Luar


Satuan : 1 m3
Kode : B.12.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.250 114,300.00 28,575.00
Mandor L.04 OH 0.025 150,300.00 3,757.50
Jumlah Tenaga 32,332.50
B BAHAN
Tanah Urug Pilihan m3 1.200 200,000.00 240,000.00
Jumlah Bahan 240,000.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 272,332.50
E OVERHEAD & PROFIT 10% x D 27,233.25
F JUMLAH HARGA PEKERJAAN (D+E) 299,565.75
G PEMBULATAN 299,600.00

Jenis Pekerjaan : Urugan Abu Batu


Satuan : 1 m3
Kode : B.13.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.250 114,300.00 28,575.00
Mandor L.04 OH 0.025 150,300.00 3,757.50
Jumlah Tenaga 32,332.50
B BAHAN
Abu Batu m3 1.200 300,000.00 360,000.00
Jumlah Bahan 360,000.00
C PERALATAN

Jumlah Alat

D JUMLAH (A+B+C) 392,332.50


E OVERHEAD & PROFIT 10% x D 39,233.25
F JUMLAH HARGA PEKERJAAN (D+E) 431,565.75
G PEMBULATAN 431,600.00

Jenis Pekerjaan : Cerucuk Bambu


Satuan : 1 m2
Kode : B.14.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.500 114,300.00 57,150.00
Mandor L.04 OH 0.025 150,300.00 3,757.50
Jumlah Tenaga 60,907.50
B BAHAN
Bambu ø 6 - 10 btg 1.150 18,000.00 20,700.00
Jumlah Bahan 20,700.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 81,607.50
E OVERHEAD & PROFIT 10% x D 8,160.75
F JUMLAH HARGA PEKERJAAN (D+E) 89,768.25
G PEMBULATAN 89,800.00

Jenis Pekerjaan : Sulingan 2" + Ijuk


Satuan : 1 m2
Kode : B.15.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.054 114,300.00 6,172.20
Jumlah Tenaga 6,172.20
B BAHAN
Pipa PVC AW 2" btg 0.800 32,125.00 25,700.00
Ijuk kg 0.250 23,500.00 5,875.00
Jumlah Bahan 31,575.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 37,747.20
E OVERHEAD & PROFIT 10% x D 3,774.72
F JUMLAH HARGA PEKERJAAN (D+E) 41,521.92
G PEMBULATAN 41,600.00

Jenis Pekerjaan : Urugan Sirtu


Satuan : 1 m3
Kode : B.16.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.250 114,300.00 28,575.00
Mandor L.04 OH 0.025 150,300.00 3,757.50
Jumlah Tenaga 32,332.50
B BAHAN
Sirtu m3 1.200 250,000.00 300,000.00
Jumlah Bahan 300,000.00
C PERALATAN

Jumlah Alat

D JUMLAH (A+B+C) 332,332.50


E OVERHEAD & PROFIT 10% x D 33,233.25
F JUMLAH HARGA PEKERJAAN (D+E) 365,565.75
G PEMBULATAN 365,600.00
C. HARGA SATUAN PEKERJAAN PONDASI

JENIS PEKERJAAN : Pondasi Batu Belah 1:3


SATUAN : 1 m3
KODE : C.1.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 1.500 114,300.00 171,450.00
Tukang Batu L.02 OH 0.750 123,300.00 92,475.00
Kepala Tukang L.03 OH 0.075 141,300.00 10,597.50
Mandor L.04 OH 0.075 150,300.00 11,272.50
Jumlah Tenaga 285,795.00
B BAHAN
Batu belah m3 1.200 250,000.00 300,000.00
Semen Portland Kg 202.000 1,300.00 262,600.00
Pasir Pasang m3 0.485 300,000.00 145,500.00
Jumlah Harga 708,100.00
C PERALATAN

Jumlah Alat

D JUMLAH (A+B+C) 993,895.00


E OVERHEAD & PROFIT 10% x D 99,389.50
F JUMLAH HARGA PEKERJAAN (D+E) 1,093,284.50
G PEMBULATAN 1,093,300.00

JENIS PEKERJAAN : Pondasi Batu Belah 1:4


SATUAN : 1 m3
KODE : C.2.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 1.500 114,300.00 171,450.00
Tukang Batu L.02 OH 0.750 123,300.00 92,475.00
Kepala Tukang L.03 OH 0.075 141,300.00 10,597.50
Mandor L.04 OH 0.075 150,300.00 11,272.50
Jumlah Tenaga 285,795.00
B BAHAN
Batu belah m3 1.200 250,000.00 300,000.00
Semen Portland Kg 163.000 1,300.00 211,900.00
Pasir Pasang m3 0.520 300,000.00 156,000.00
Jumlah Harga 667,900.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 953,695.00
E OVERHEAD & PROFIT 10% x D 95,369.50
F JUMLAH HARGA PEKERJAAN (D+E) 1,049,064.50
G PEMBULATAN 1,049,100.00

JENIS PEKERJAAN : Pondasi Batu Belah 1:5


SATUAN : 1 m3
KODE : C.3.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 1.500 114,300.00 171,450.00
Tukang Batu L.02 OH 0.750 123,300.00 92,475.00
Kepala Tukang L.03 OH 0.075 141,300.00 10,597.50
Mandor L.04 OH 0.075 150,300.00 11,272.50
Jumlah Tenaga 285,795.00
B BAHAN
Batu belah m3 1.200 250,000.00 300,000.00
Semen Portland Kg 136.000 1,300.00 176,800.00
Pasir Pasang m3 0.544 300,000.00 163,200.00
Jumlah Harga 640,000.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 925,795.00
E OVERHEAD & PROFIT 10% x D 92,579.50
F JUMLAH HARGA PEKERJAAN (D+E) 1,018,374.50
G PEMBULATAN 1,018,400.00

JENIS PEKERJAAN : Batu Kosong (Anstamping)


SATUAN : 1 m3
KODE : C.4.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.780 114,300.00 89,154.00
Tukang Batu L.02 OH 0.390 123,300.00 48,087.00
Kepala Tukang L.03 OH 0.039 141,300.00 5,510.70
Mandor L.04 OH 0.039 150,300.00 5,861.70
Jumlah Tenaga 148,613.40
B BAHAN
Batu belah m3 1.200 250,000.00 300,000.00
Pasir urug m3 0.432 200,000.00 86,400.00
Jumlah Harga 386,400.00
C PERALATAN

Jumlah Alat

D JUMLAH (A+B+C) 535,013.40


E OVERHEAD & PROFIT 10% x D 53,501.34
F JUMLAH HARGA PEKERJAAN (D+E) 588,514.74
G PEMBULATAN 588,600.00

JENIS PEKERJAAN : Pondasi Siklop 60% Beton 1:2:3 dan 40 % Batu Belah
SATUAN : 1 m3
KODE : C.5.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 3.400 114,300.00 388,620.00
Tukang Batu L.02 OH 0.850 123,300.00 104,805.00
Kepala Tukang L.03 OH 0.085 141,300.00 12,010.50
Mandor L.04 OH 0.170 150,300.00 25,551.00
Jumlah Tenaga 530,986.50
B BAHAN
Batu belah m3 0.480 250,000.00 120,000.00
Semen Portland Kg 194.000 1,300.00 252,200.00
Pasir Beton m3 0.312 300,000.00 93,600.00
Kerikil / Seplit m3 0.468 300,000.00 140,400.00
Besi Beton Kg 126.000 13,000.00 1,638,000.00
Kawat Beton Kg 1.800 25,000.00 45,000.00
Jumlah Harga 2,289,200.00
C PERALATAN

Jumlah Alat

D JUMLAH (A+B+C) 2,820,186.50


E OVERHEAD & PROFIT 10% x D 282,018.65
F JUMLAH HARGA PEKERJAAN (D+E) 3,102,205.15
G PEMBULATAN 3,102,300.00
JENIS PEKERJAAN : Pondasi Sumuran ø 1 m
SATUAN : 1 m3
KODE : C.6.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 2.400 114,300.00 274,320.00
Tukang Batu L.02 OH 0.800 123,300.00 98,640.00
Kepala Tukang L.03 OH 0.080 141,300.00 11,304.00
Mandor L.04 OH 0.119 150,300.00 17,885.70
Jumlah Tenaga 402,149.70
B BAHAN
Batu belah m3 0.450 250,000.00 112,500.00
Semen Portland Kg 194.000 1,300.00 252,200.00
Pasir Beton m3 0.312 300,000.00 93,600.00
Kerikil / Seplit m3 0.468 300,000.00 140,400.00
Jumlah Harga 598,700.00
C PERALATAN

Jumlah Alat

D JUMLAH (A+B+C) 1,000,849.70


E OVERHEAD & PROFIT 10% x D 100,084.97
F JUMLAH HARGA PEKERJAAN (D+E) 1,100,934.67
G PEMBULATAN 1,101,000.00
D1. HARGA SATUAN PEKERJAAN BEKISTING

JENIS PEKERJAAN : Bekisting Pondasi


SATUAN : 1 m2
KODE : D1.1.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.5200 114,300.00 59,436.00
Tukang L.02 OH 0.2600 123,300.00 32,058.00
Kepala Tukang L.03 OH 0.0260 141,300.00 3,673.80
Mandor L.04 OH 0.0260 150,300.00 3,907.80
Jumlah Tenaga 99,075.60
B BAHAN
Kayu papan Kelas III m3 0.0400 2,100,000.00 84,000.00
Paku 4 - 7 cm kg 0.3000 17,000.00 5,100.00
Minyak bekisting liter 0.1000 54,400.00 5,440.00
Jumlah Harga 94,540.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 193,615.60
E OVERHEAD & PROFIT 10% x D 19,361.56
F JUMLAH HARGA PEKERJAAN (D+E) 212,977.16
G PEMBULATAN 213,000.00

JENIS PEKERJAAN : Bekisting Sloof


SATUAN : 1 m2
KODE : D1.2.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.5200 114,300.00 59,436.00
Tukang L.02 OH 0.2600 123,300.00 32,058.00
Kepala Tukang L.03 OH 0.0260 141,300.00 3,673.80
Mandor L.04 OH 0.0260 150,300.00 3,907.80
Jumlah Tenaga 99,075.60
B BAHAN
Kayu papan Kelas III m3 0.0450 2,100,000.00 94,500.00
Paku 4 - 7 cm kg 0.3000 17,000.00 5,100.00
Minyak bekisting liter 0.1000 54,400.00 5,440.00
Jumlah Harga 105,040.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 204,115.60
E OVERHEAD & PROFIT 10% x D 20,411.56
F JUMLAH HARGA PEKERJAAN (D+E) 224,527.16
G PEMBULATAN 224,600.00

JENIS PEKERJAAN : Bekisting Kolom


SATUAN : 1 m2
KODE : D1.3.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.6600 114,300.00 75,438.00
Tukang L.02 OH 0.3300 123,300.00 40,689.00
Kepala Tukang L.03 OH 0.0330 141,300.00 4,662.90
Mandor L.04 OH 0.0330 150,300.00 4,959.90
Jumlah Tenaga 125,749.80
B BAHAN
Kayu papan Kelas III m3 0.0400 2,100,000.00 84,000.00
Paku 8 - 15 cm kg 0.4000 17,000.00 6,800.00
Minyak bekisting liter 0.2000 54,400.00 10,880.00
Kayu Balok Kelas III m3 0.0150 2,100,000.00 31,500.00
Multiplek 9 mm lembar 0.3500 150,000.00 52,500.00
Bambu ø 5 - 6 batang 2.0000 15,000.00 30,000.00
Jumlah Harga 215,680.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 341,429.80
E OVERHEAD & PROFIT 10% x D 34,142.98
F JUMLAH HARGA PEKERJAAN (D+E) 375,572.78
G PEMBULATAN 375,600.00

JENIS PEKERJAAN : Bekisting Balok


SATUAN : 1 m2
KODE : D1.4.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.6600 114,300.00 75,438.00
Tukang L.02 OH 0.3300 123,300.00 40,689.00
Kepala Tukang L.03 OH 0.0330 141,300.00 4,662.90
Mandor L.04 OH 0.0330 150,300.00 4,959.90
Jumlah Tenaga 125,749.80
B BAHAN
Kayu papan Kelas III m3 0.0400 2,100,000.00 84,000.00
Paku 8 - 15 cm kg 0.4000 17,000.00 6,800.00
Minyak bekisting liter 0.2000 54,400.00 10,880.00
Kayu Balok Kelas III m3 0.0180 2,100,000.00 37,800.00
Multiplek 9 mm lembar 0.3500 150,000.00 52,500.00
Bambu ø 5 - 6 batang 2.0000 15,000.00 30,000.00
Jumlah Harga 221,980.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 347,729.80
E OVERHEAD & PROFIT 10% x D 34,772.98
F JUMLAH HARGA PEKERJAAN (D+E) 382,502.78
G PEMBULATAN 382,600.00

JENIS PEKERJAAN : Bekisting Plat Lantai


SATUAN : 1 m2
KODE : D1.5.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.6600 114,300.00 75,438.00
Tukang L.02 OH 0.3300 123,300.00 40,689.00
Kepala Tukang L.03 OH 0.0330 141,300.00 4,662.90
Mandor L.04 OH 0.0330 150,300.00 4,959.90
Jumlah Tenaga 125,749.80
B BAHAN
Kayu papan Kelas III m3 0.0400 2,100,000.00 84,000.00
Paku 8 - 15 cm kg 0.4000 17,000.00 6,800.00
Minyak bekisting liter 0.2000 54,400.00 10,880.00
Kayu Balok Kelas III m3 0.0150 2,100,000.00 31,500.00
Multiplek 9 mm lembar 0.3500 150,000.00 52,500.00
Bambu ø 5 - 6 batang 6.0000 15,000.00 90,000.00
Jumlah Harga 275,680.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 401,429.80
E OVERHEAD & PROFIT 10% x D 40,142.98
F JUMLAH HARGA PEKERJAAN (D+E) 441,572.78
G PEMBULATAN 441,600.00

JENIS PEKERJAAN : Bekisting Dinding


SATUAN : 1 m2
KODE : D1.6.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.6600 114,300.00 75,438.00
Tukang L.02 OH 0.3300 123,300.00 40,689.00
Kepala Tukang L.03 OH 0.0330 141,300.00 4,662.90
Mandor L.04 OH 0.0330 150,300.00 4,959.90
Jumlah Tenaga 125,749.80
B BAHAN
Kayu papan Kelas III m3 0.0300 2,100,000.00 63,000.00
Paku 8 - 15 cm kg 0.4000 17,000.00 6,800.00
Minyak bekisting liter 0.2000 54,400.00 10,880.00
Kayu Balok Kelas III m3 0.0200 2,100,000.00 42,000.00
Multiplek 9 mm lembar 0.3500 150,000.00 52,500.00
Bambu ø 5 - 6 batang 3.0000 15,000.00 45,000.00
Spacer batang 4.0000 -
Jumlah Harga 220,180.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 345,929.80
E OVERHEAD & PROFIT 10% x D 34,592.98
F JUMLAH HARGA PEKERJAAN (D+E) 380,522.78
G PEMBULATAN 380,600.00

JENIS PEKERJAAN : Bekisting Tangga


SATUAN : 1 m2
KODE : D1.7.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.6600 114,300.00 75,438.00
Tukang L.02 OH 0.3300 123,300.00 40,689.00
Kepala Tukang L.03 OH 0.0330 141,300.00 4,662.90
Mandor L.04 OH 0.0330 150,300.00 4,959.90
Jumlah Tenaga 125,749.80
B BAHAN
Kayu papan Kelas III m3 0.0300 2,100,000.00 63,000.00
Paku 8 - 15 cm kg 0.4000 17,000.00 6,800.00
Minyak bekisting liter 0.1500 54,400.00 8,160.00
Kayu Balok Kelas III m3 0.0150 2,100,000.00 31,500.00
Multiplek 9 mm lembar 0.3500 150,000.00 52,500.00
Bambu ø 5 - 6 batang 2.0000 15,000.00 30,000.00
Jumlah Harga 191,960.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 317,709.80
E OVERHEAD & PROFIT 10% x D 31,770.98
F JUMLAH HARGA PEKERJAAN (D+E) 349,480.78
G PEMBULATAN 349,500.00
E. HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM

JENIS PEKERJAAN : Pengelasan Las Listrik 1 cm


SATUAN : 1 cm
KODE : E.1.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.0040 114,300.00 457.20
Tukang L.03 OH 0.0020 123,300.00 246.60
Kepala tukang L.03 OH 0.0002 141,300.00 28.26
Mandor L.04 OH 0.0002 150,300.00 30.06
Jumlah Tenaga 762.12
B BAHAN
Kawat las buah 0.2500 1,500.00 375.00
Jumlah Harga 375.00
C PERALATAN

Jumlah Alat -
D JUMLAH (A+B+C) 1,137.12
E OVERHEAD & PROFIT 10% x D 113.71
F JUMLAH HARGA PEKERJAAN (D+E) 1,250.83
G PEMBULATAN 1,300.00

JENIS PEKERJAAN : Pemasangan Folding Gate


SATUAN : 1 m2
KODE : E.2.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.1200 114,300.00 13,716.00
Tukang L.03 OH 0.1200 123,300.00 14,796.00
Kepala tukang L.03 OH 0.0120 141,300.00 1,695.60
Mandor L.04 OH 0.0060 150,300.00 901.80
Jumlah Tenaga 31,109.40
B BAHAN
Folding Gate m2 1.0000 395,000.00 395,000.00
Jumlah Harga 395,000.00
C PERALATAN

Jumlah Alat -
D JUMLAH (A+B+C) 426,109.40
E OVERHEAD & PROFIT 10% x D 42,610.94
F JUMLAH HARGA PEKERJAAN (D+E) 468,720.34
G PEMBULATAN 468,800.00

JENIS PEKERJAAN : Pemasangan Rolling door


SATUAN : 1 m2
KODE : E.3.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.1000 114,300.00 11,430.00
Tukang L.03 OH 0.1000 123,300.00 12,330.00
Kepala tukang L.03 OH 0.0100 141,300.00 1,413.00
Mandor L.04 OH 0.0050 150,300.00 751.50
Jumlah Tenaga 25,924.50
B BAHAN
Rolling door m2 1.0000 350,000.00 350,000.00
Jumlah Harga 350,000.00
C PERALATAN

Jumlah Alat -
D JUMLAH (A+B+C) 375,924.50
E OVERHEAD & PROFIT 10% x D 37,592.45
F JUMLAH HARGA PEKERJAAN (D+E) 413,516.95
G PEMBULATAN 413,600.00
JENIS PEKERJAAN : Pemasangan Kusen Alumunium
SATUAN : 1 Unit
KODE : E.4.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.0430 114,300.00 4,914.90
Tukang alumunium L.03 OH 0.0430 123,300.00 5,301.90
Kepala tukang L.03 OH 0.0043 141,300.00 607.59
Mandor L.04 OH 0.0021 150,300.00 315.63
Jumlah Tenaga 11,140.02
B BAHAN
Sekrup 1 - 3 cm buah 6.0000 750.00 4,500.00
Sealant Tube 0.5000 34,000.00 17,000.00
Jumlah Harga 21,500.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 32,640.02
E OVERHEAD & PROFIT 10% x D 3,264.00
F JUMLAH HARGA PEKERJAAN (D+E) 35,904.02
G PEMBULATAN 36,000.00

JENIS PEKERJAAN : Pemasangan Talang datar PVC U-15 cm (AW)


SATUAN : 1 m1
KODE : E.5.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.1500 114,300.00 17,145.00
Tukang L.03 OH 0.4000 123,300.00 49,320.00
Kepala tukang L.03 OH 0.0250 141,300.00 3,532.50
Mandor L.04 OH 0.0013 150,300.00 195.39
Jumlah Tenaga 70,192.89
B BAHAN
Talang PVC U-15 cm m1 1.0500 34,375.00 36,093.75
Assesories 35 % % 1.0000 12,632.81 12,632.81
Jumlah Harga 48,726.56
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 118,919.45
E OVERHEAD & PROFIT 10% x D 11,891.95
F JUMLAH HARGA PEKERJAAN (D+E) 130,811.40
G PEMBULATAN 130,900.00

JENIS PEKERJAAN : Pemasangan Talang Datar Seng BJLS 30


SATUAN : 1 m1
KODE : E.6.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.2000 114,300.00 22,860.00
Tukang L.03 OH 0.2000 123,300.00 24,660.00
Kepala tukang L.03 OH 0.0200 141,300.00 2,826.00
Mandor L.04 OH 0.0010 150,300.00 150.30
Jumlah Tenaga 50,496.30
B BAHAN
Seng Plat BJLS 30, lebar 90cm m1 1.0500 71,000.00 74,550.00
Paku 1 - 3 cm kg 0.0150 20,000.00 300.00
Kayu papan kelas III m3 0.0190 2,100,000.00 39,900.00
Jumlah Harga 114,750.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 165,246.30
E OVERHEAD & PROFIT 10% x D 16,524.63
F JUMLAH HARGA PEKERJAAN (D+E) 181,770.93
G PEMBULATAN 181,800.00
D. HARGA SATUAN PEKERJAAN BETON

JENIS PEKERJAAN : Beton Mutu K-100


SATUAN : 1 m3
KODE : D.1.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 1.6500 114,300.00 188,595.00
Tukang Batu L.02 OH 0.2750 123,300.00 33,907.50
Kepala Tukang L.03 OH 0.0280 141,300.00 3,956.40
Mandor L.04 OH 0.0830 150,300.00 12,474.90
Jumlah Tenaga 238,933.80
B BAHAN
Semen Portland kg 247.0000 1,300.00 321,100.00
Pasir beton m3 0.6210 300,000.00 186,300.00
Kerikil / Seplit m3 0.7400 300,000.00 222,000.00
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga 750,900.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 989,833.80
E OVERHEAD & PROFIT 10% x D 98,983.38
F JUMLAH HARGA PEKERJAAN (D+E) 1,088,817.18
G PEMBULATAN 1,088,900.00

JENIS PEKERJAAN : Beton Mutu K-125


SATUAN : 1 m3
KODE : D.2.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 1.6500 114,300.00 188,595.00
Tukang Batu L.02 OH 0.2750 123,300.00 33,907.50
Kepala Tukang L.03 OH 0.0280 141,300.00 3,956.40
Mandor L.04 OH 0.0830 150,300.00 12,474.90
Jumlah Tenaga 238,933.80
B BAHAN
Semen Portland kg 276.0000 1,300.00 358,800.00
Pasir beton m3 0.5910 300,000.00 177,300.00
Kerikil / Seplit m3 0.7500 300,000.00 225,000.00
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga 782,600.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 1,021,533.80
E OVERHEAD & PROFIT 10% x D 102,153.38
F JUMLAH HARGA PEKERJAAN (D+E) 1,123,687.18
G PEMBULATAN 1,123,700.00

JENIS PEKERJAAN : Beton Mutu K-150


SATUAN : 1 m3
KODE : D.3.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 1.6500 114,300.00 188,595.00
Tukang Batu L.02 OH 0.2750 123,300.00 33,907.50
Kepala Tukang L.03 OH 0.0280 141,300.00 3,956.40
Mandor L.04 OH 0.0830 150,300.00 12,474.90
Jumlah Tenaga 238,933.80
B BAHAN
Semen Portland kg 299.0000 1,300.00 388,700.00
Pasir beton m3 0.5710 300,000.00 171,300.00
Kerikil / Seplit m3 0.7530 300,000.00 225,900.00
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga 807,400.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 1,046,333.80
E OVERHEAD & PROFIT 10% x D 104,633.38
F JUMLAH HARGA PEKERJAAN (D+E) 1,150,967.18
G PEMBULATAN 1,151,000.00

JENIS PEKERJAAN : Beton Mutu K-175


SATUAN : 1 m3
KODE : D.4.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 1.6500 114,300.00 188,595.00
Tukang Batu L.02 OH 0.2750 123,300.00 33,907.50
Kepala Tukang L.03 OH 0.0280 141,300.00 3,956.40
Mandor L.04 OH 0.0830 150,300.00 12,474.90
Jumlah Tenaga 238,933.80
B BAHAN
Semen Portland kg 326.0000 1,300.00 423,800.00
Pasir beton m3 0.5429 300,000.00 162,870.00
Kerikil / Seplit m3 0.7440 300,000.00 223,200.00
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga 831,370.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 1,070,303.80
E OVERHEAD & PROFIT 10% x D 107,030.38
F JUMLAH HARGA PEKERJAAN (D+E) 1,177,334.18
G PEMBULATAN 1,177,400.00

JENIS PEKERJAAN : Beton Mutu K-200


SATUAN : 1 m3
KODE : D.5.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 1.6500 114,300.00 188,595.00
Tukang Batu L.02 OH 0.2750 123,300.00 33,907.50
Kepala Tukang L.03 OH 0.0280 141,300.00 3,956.40
Mandor L.04 OH 0.0830 150,300.00 12,474.90
Jumlah Tenaga 238,933.80
B BAHAN
Semen Portland kg 352.0000 1,300.00 457,600.00
Pasir beton m3 0.5221 300,000.00 156,630.00
Kerikil / Seplit m3 0.7440 300,000.00 223,200.00
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga 858,930.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 1,097,863.80
E OVERHEAD & PROFIT 10% x D 109,786.38
F JUMLAH HARGA PEKERJAAN (D+E) 1,207,650.18
G PEMBULATAN 1,207,700.00

JENIS PEKERJAAN : Beton Mutu K-225


SATUAN : 1 m3
KODE : D.6.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 1.6500 114,300.00 188,595.00
Tukang Batu L.02 OH 0.2750 123,300.00 33,907.50
Kepala Tukang L.03 OH 0.0280 141,300.00 3,956.40
Mandor L.04 OH 0.0830 150,300.00 12,474.90
Jumlah Tenaga 238,933.80
B BAHAN
Semen Portland kg 371.0000 1,300.00 482,300.00
Pasir beton m3 0.4986 300,000.00 149,580.00
Kerikil / Seplit m3 0.7440 300,000.00 223,200.00
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga 876,580.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 1,115,513.80
E OVERHEAD & PROFIT 10% x D 111,551.38
F JUMLAH HARGA PEKERJAAN (D+E) 1,227,065.18
G PEMBULATAN 1,227,100.00

JENIS PEKERJAAN : Beton Mutu K-250


SATUAN : 1 m3
KODE : D.7.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 1.6500 114,300.00 188,595.00
Tukang Batu L.02 OH 0.2750 123,300.00 33,907.50
Kepala Tukang L.03 OH 0.0280 141,300.00 3,956.40
Mandor L.04 OH 0.0830 150,300.00 12,474.90
Jumlah Tenaga 238,933.80
B BAHAN
Semen Portland kg 384.0000 1,300.00 499,200.00
Pasir beton m3 0.4940 300,000.00 148,200.00
Kerikil / Seplit m3 0.7700 300,000.00 231,000.00
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga 899,900.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 1,138,833.80
E OVERHEAD & PROFIT 10% x D 113,883.38
F JUMLAH HARGA PEKERJAAN (D+E) 1,252,717.18
G PEMBULATAN 1,252,800.00

JENIS PEKERJAAN : Beton Mutu K-100 (1:3:5)


SATUAN : 1 m3
KODE : D.8.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 1.2000 114,300.00 137,160.00
Tukang Batu L.02 OH 0.2000 123,300.00 24,660.00
Kepala Tukang L.03 OH 0.0200 141,300.00 2,826.00
Mandor L.04 OH 0.0600 150,300.00 9,018.00
Jumlah Tenaga 173,664.00
B BAHAN
Semen Portland kg 230.0000 1,300.00 299,000.00
Pasir beton m3 0.6380 300,000.00 191,400.00
Kerikil / Seplit m3 0.7610 300,000.00 228,300.00
Air Liter 200.0000 100.00 20,000.00
Jumlah Harga 738,700.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 912,364.00
E OVERHEAD & PROFIT 10% x D 91,236.40
F JUMLAH HARGA PEKERJAAN (D+E) 1,003,600.40
G PEMBULATAN 1,003,700.00

JENIS PEKERJAAN : Pembesian 10 Kg Besi Polos / Ulir


SATUAN : 10 Kg
KODE : D.9.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.0700 114,300.00 8,001.00
Tukang Besi L.02 OH 0.0700 123,300.00 8,631.00
Kepala Tukang L.03 OH 0.0070 141,300.00 989.10
Mandor L.04 OH 0.0040 150,300.00 601.20
Jumlah Tenaga 18,222.30
B BAHAN
Besi beton kg 10.5000 13,000.00 136,500.00
Kawat beton kg 0.1500 25,000.00 3,750.00
Jumlah Harga 140,250.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 158,472.30
E OVERHEAD & PROFIT 10% x D 15,847.23
F JUMLAH HARGA PEKERJAAN (D+E) 174,319.53
G PEMBULATAN 174,400.00

JENIS PEKERJAAN : Pembesian 1 Kg Besi Polos / Ulir


SATUAN : 1 Kg
KODE : D.9.Hit-a

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.0070 114,300.00 800.10
Tukang Besi L.02 OH 0.0070 123,300.00 863.10
Kepala Tukang L.03 OH 0.0007 141,300.00 98.91
Mandor L.04 OH 0.0004 150,300.00 60.12
Jumlah Tenaga 1,822.23
B BAHAN
Besi beton kg 1.0500 13,000.00 13,650.00
Kawat beton kg 0.0150 25,000.00 375.00
Jumlah Harga 14,025.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 15,847.23
E OVERHEAD & PROFIT 10% x D 1,584.72
F JUMLAH HARGA PEKERJAAN (D+E) 17,431.95
G PEMBULATAN 17,500.00

JENIS PEKERJAAN : Pondasi Beton (150 kg Besi + Bekisting) K-175


SATUAN : 1 m3
KODE : D.10.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 5.3000 114,300.00 605,790.00
Tukang batu L.02 OH 0.2750 123,300.00 33,907.50
Tukang kayu L.02 OH 1.3000 123,300.00 160,290.00
Tukang besi L.02 OH 1.0500 123,300.00 129,465.00
Kepala tukang L.03 OH 0.2620 141,300.00 37,020.60
Mandor L.04 OH 0.2650 150,300.00 39,829.50
Jumlah Tenaga 1,006,302.60
B BAHAN
Kayu Papan kelas III m3 0.2000 2,100,000.00 420,000.00
Paku 4 - 7 cm kg 1.5000 17,000.00 25,500.00
Besi Beton kg 150.0000 13,000.00 1,950,000.00
Kawat beton kg 2.2500 25,000.00 56,250.00
Semen Portland kg 326.0000 1,300.00 423,800.00
Pasir beton m3 0.5429 300,000.00 162,870.00
Kerikil / Seplit m3 0.7440 300,000.00 223,200.00
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga 3,283,120.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 4,289,422.60
E OVERHEAD & PROFIT 10% x D 428,942.26
F JUMLAH HARGA PEKERJAAN (D+E) 4,718,364.86
G PEMBULATAN 4,718,400.00

JENIS PEKERJAAN : Pondasi Beton (150 kg Besi + Bekisting) K-225


SATUAN : 1 m3
KODE : D.10.Hit-a

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 5.3000 114,300.00 605,790.00
Tukang batu L.02 OH 0.2750 123,300.00 33,907.50
Tukang kayu L.02 OH 1.3000 123,300.00 160,290.00
Tukang besi L.02 OH 1.0500 123,300.00 129,465.00
Kepala tukang L.03 OH 0.2620 141,300.00 37,020.60
Mandor L.04 OH 0.2650 150,300.00 39,829.50
Jumlah Tenaga 1,006,302.60
B BAHAN
Kayu Papan kelas III m3 0.2000 2,100,000.00 420,000.00
Paku 4 - 7 cm kg 1.5000 17,000.00 25,500.00
Besi Beton kg 150.0000 13,000.00 1,950,000.00
Kawat beton kg 2.2500 25,000.00 56,250.00
Semen Portland kg 371.0000 1,300.00 482,300.00
Pasir beton m3 0.4986 300,000.00 149,580.00
Kerikil / Seplit m3 0.7440 300,000.00 223,200.00
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga 3,328,330.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 4,334,632.60
E OVERHEAD & PROFIT 10% x D 433,463.26
F JUMLAH HARGA PEKERJAAN (D+E) 4,768,095.86
G PEMBULATAN 4,768,100.00

JENIS PEKERJAAN : Tangga Beton (200 kg Besi + Bekisting) K-175


SATUAN : 1 m3
KODE : D.11.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 5.6500 114,300.00 645,795.00
Tukang batu L.02 OH 0.2750 123,300.00 33,907.50
Tukang kayu L.02 OH 1.5600 123,300.00 192,348.00
Tukang besi L.02 OH 1.4000 123,300.00 172,620.00
Kepala tukang L.03 OH 0.3230 141,300.00 45,639.90
Mandor L.04 OH 0.2830 150,300.00 42,534.90
Jumlah Tenaga 1,132,845.30
B BAHAN
Kayu Papan kelas III m3 0.2700 2,100,000.00 567,000.00
Paku 4 - 7 cm kg 2.0000 17,000.00 34,000.00
Besi Beton kg 200.0000 13,000.00 2,600,000.00
Kawat beton kg 3.0000 25,000.00 75,000.00
Semen Portland kg 326.0000 1,300.00 423,800.00
Pasir beton m3 0.5400 300,000.00 162,000.00
Kerikil / Seplit m3 0.8100 300,000.00 243,000.00
Jumlah Harga 4,104,800.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 5,237,645.30
E OVERHEAD & PROFIT 10% x D 523,764.53
F JUMLAH HARGA PEKERJAAN (D+E) 5,761,409.83
G PEMBULATAN 5,761,500.00

JENIS PEKERJAAN : Sloof 15x18 (201 kg Besi + Bekisting) K-175


SATUAN : 1 m3
KODE : D.12.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 5.6500 114,300.00 645,795.00
Tukang batu L.02 OH 0.2750 123,300.00 33,907.50
Tukang kayu L.02 OH 1.5600 123,300.00 192,348.00
Tukang besi L.02 OH 1.4070 123,300.00 173,483.10
Kepala tukang L.03 OH 0.3230 141,300.00 45,639.90
Mandor L.04 OH 0.2830 150,300.00 42,534.90
Jumlah Tenaga 1,133,708.40
B BAHAN
Kayu Papan kelas III m3 0.2700 2,100,000.00 567,000.00
Paku 4 - 7 cm kg 2.0000 17,000.00 34,000.00
Besi Beton kg 201.0000 13,000.00 2,613,000.00
Kawat beton kg 3.0000 25,000.00 75,000.00
Semen Portland kg 326.0000 1,300.00 423,800.00
Pasir beton m3 0.5400 300,000.00 162,000.00
Kerikil / Seplit m3 0.8100 300,000.00 243,000.00
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga 4,139,300.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 5,273,008.40
E OVERHEAD & PROFIT 10% x D 527,300.84
F JUMLAH HARGA PEKERJAAN (D+E) 5,800,309.24
G PEMBULATAN 5,800,400.00

JENIS PEKERJAAN : Sloof 15x20 (180 kg Besi + Bekisting) K-225


SATUAN : 1 m3
KODE : D.13.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 5.6500 114,300.00 645,795.00
Tukang batu L.02 OH 0.2750 123,300.00 33,907.50
Tukang kayu L.02 OH 1.5600 123,300.00 192,348.00
Tukang besi L.02 OH 1.4070 123,300.00 173,483.10
Kepala tukang L.03 OH 0.3230 141,300.00 45,639.90
Mandor L.04 OH 0.2830 150,300.00 42,534.90
Jumlah Tenaga 1,133,708.40
B BAHAN
Kayu Papan kelas III m3 0.2700 2,100,000.00 567,000.00
Paku 4 - 7 cm kg 2.0000 17,000.00 34,000.00
Besi Beton kg 180.0000 13,000.00 2,340,000.00
Kawat beton kg 3.0000 25,000.00 75,000.00
Semen Portland kg 371.0000 1,300.00 482,300.00
Pasir beton m3 0.4986 300,000.00 149,580.00
Kerikil / Seplit m3 0.7440 300,000.00 223,200.00
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga 3,892,580.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 5,026,288.40
E OVERHEAD & PROFIT 10% x D 502,628.84
F JUMLAH HARGA PEKERJAAN (D+E) 5,528,917.24
G PEMBULATAN 5,529,000.00

JENIS PEKERJAAN : Sloof 20x30 (201 kg Besi + Bekisting) K-175


SATUAN : 1 m3
KODE : D.14.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 5.6500 114,300.00 645,795.00
Tukang batu L.02 OH 0.2750 123,300.00 33,907.50
Tukang kayu L.02 OH 1.5600 123,300.00 192,348.00
Tukang besi L.02 OH 1.4070 123,300.00 173,483.10
Kepala tukang L.03 OH 0.3230 141,300.00 45,639.90
Mandor L.04 OH 0.2830 150,300.00 42,534.90
Jumlah Tenaga 1,133,708.40
B BAHAN
Kayu Papan kelas III m3 0.5400 2,100,000.00 1,134,000.00
Paku 4 - 7 cm kg 4.0000 17,000.00 68,000.00
Besi Beton kg 201.0000 13,000.00 2,613,000.00
Kawat beton kg 3.0000 25,000.00 75,000.00
Semen Portland kg 326.0000 1,300.00 423,800.00
Pasir beton m3 0.5400 300,000.00 162,000.00
Kerikil / Seplit m3 0.8100 300,000.00 243,000.00
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga 4,740,300.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 5,874,008.40
E OVERHEAD & PROFIT 10% x D 587,400.84
F JUMLAH HARGA PEKERJAAN (D+E) 6,461,409.24
G PEMBULATAN 6,461,500.00

JENIS PEKERJAAN : Sloof 20x30 (201 kg Besi + Bekisting) K-225


SATUAN : 1 m3
KODE : D.14.Hit-a

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 5.6500 114,300.00 645,795.00
Tukang batu L.02 OH 0.2750 123,300.00 33,907.50
Tukang kayu L.02 OH 1.5600 123,300.00 192,348.00
Tukang besi L.02 OH 1.4070 123,300.00 173,483.10
Kepala tukang L.03 OH 0.3230 141,300.00 45,639.90
Mandor L.04 OH 0.2830 150,300.00 42,534.90
Jumlah Tenaga 1,133,708.40
B BAHAN
Kayu Papan kelas III m3 0.5400 2,100,000.00 1,134,000.00
Paku 4 - 7 cm kg 4.0000 17,000.00 68,000.00
Besi Beton kg 201.0000 13,000.00 2,613,000.00
Kawat beton kg 3.0000 25,000.00 75,000.00
Semen Portland kg 371.0000 1,300.00 482,300.00
Pasir beton m3 0.4986 300,000.00 149,580.00
Kerikil / Seplit m3 0.7440 300,000.00 223,200.00
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga 4,766,580.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 5,900,288.40
E OVERHEAD & PROFIT 10% x D 590,028.84
F JUMLAH HARGA PEKERJAAN (D+E) 6,490,317.24
G PEMBULATAN 6,490,400.00

JENIS PEKERJAAN : Kolom 12x12 (239 kg Besi + Bekisting) K-175


SATUAN : 1 m3
KODE : D.15.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 7.0500 114,300.00 805,815.00
Tukang batu L.02 OH 0.2750 123,300.00 33,907.50
Tukang kayu L.02 OH 1.6500 123,300.00 203,445.00
Tukang besi L.02 OH 1.6730 123,300.00 206,280.90
Kepala tukang L.03 OH 0.4030 141,300.00 56,943.90
Mandor L.04 OH 0.3530 150,300.00 53,055.90
Jumlah Tenaga 1,359,448.20
B BAHAN
Kayu Papan kelas III m3 0.2700 2,100,000.00 567,000.00
Paku 4 - 7 cm kg 0.4000 17,000.00 6,800.00
Besi Beton kg 239.0000 13,000.00 3,107,000.00
Kawat beton kg 3.5000 25,000.00 87,500.00
Semen Portland kg 326.0000 1,300.00 423,800.00
Pasir beton m3 0.5400 300,000.00 162,000.00
Kerikil / Seplit m3 0.8100 300,000.00 243,000.00
Kayu Balok Kelas II M3 0.1500 2,500,000.00 375,000.00
Bambu ø 5 - 6 Batang 2.0000 15,000.00 30,000.00
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga 5,023,600.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 6,383,048.20
E OVERHEAD & PROFIT 10% x D 638,304.82
F JUMLAH HARGA PEKERJAAN (D+E) 7,021,353.02
G PEMBULATAN 7,021,400.00

JENIS PEKERJAAN : Kolom 13x18 (200 kg Besi + Bekisting) K-175


SATUAN : 1 m3
KODE : D.16.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 7.0500 114,300.00 805,815.00
Tukang batu L.02 OH 0.2750 123,300.00 33,907.50
Tukang kayu L.02 OH 1.6500 123,300.00 203,445.00
Tukang besi L.02 OH 1.4000 123,300.00 172,620.00
Kepala tukang L.03 OH 0.4030 141,300.00 56,943.90
Mandor L.04 OH 0.3530 150,300.00 53,055.90
Jumlah Tenaga 1,325,787.30
B BAHAN
Paku 4 - 7 cm kg 4.0000 17,000.00 68,000.00
Besi Beton kg 200.0000 13,000.00 2,600,000.00
Kawat beton kg 2.4000 25,000.00 60,000.00
Semen Portland kg 326.0000 1,300.00 423,800.00
Pasir beton m3 0.5400 300,000.00 162,000.00
Kerikil / Seplit m3 0.8100 300,000.00 243,000.00
Kayu Balok Kelas II M3 0.1500 2,500,000.00 375,000.00
Multiplek 9 mm Lbr 3.5000 150,000.00 525,000.00
Bambu ø 5 - 6 Batang 2.0000 15,000.00 30,000.00
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga 4,508,300.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 5,834,087.30
E OVERHEAD & PROFIT 10% x D 583,408.73
F JUMLAH HARGA PEKERJAAN (D+E) 6,417,496.03
G PEMBULATAN 6,417,500.00

JENIS PEKERJAAN : Kolom 18x18 (172 kg Besi + Bekisting) K-175


SATUAN : 1 m3
KODE : D.17.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 7.0500 114,300.00 805,815.00
Tukang batu L.02 OH 0.2750 123,300.00 33,907.50
Tukang kayu L.02 OH 1.6500 123,300.00 203,445.00
Tukang besi L.02 OH 1.2040 123,300.00 148,453.20
Kepala tukang L.03 OH 0.4030 141,300.00 56,943.90
Mandor L.04 OH 0.3530 150,300.00 53,055.90
Jumlah Tenaga 1,301,620.50
B BAHAN
Paku 4 - 7 cm kg 4.0000 17,000.00 68,000.00
Besi Beton kg 172.0000 13,000.00 2,236,000.00
Kawat beton kg 1.8000 25,000.00 45,000.00
Semen Portland kg 326.0000 1,300.00 423,800.00
Pasir beton m3 0.5400 300,000.00 162,000.00
Kerikil / Seplit m3 0.8100 300,000.00 243,000.00
Kayu Balok Kelas II M3 0.1500 2,500,000.00 375,000.00
Multiplek 9 mm Lbr 3.5000 150,000.00 525,000.00
Bambu ø 5 - 6 Batang 2.0000 15,000.00 30,000.00
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga 4,129,300.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 5,430,920.50
E OVERHEAD & PROFIT 10% x D 543,092.05
F JUMLAH HARGA PEKERJAAN (D+E) 5,974,012.55
G PEMBULATAN 5,974,100.00

JENIS PEKERJAAN : Kolom 20x20 (210 kg Besi + Bekisting) K-175


SATUAN : 1 m3
KODE : D.18.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 7.0500 114,300.00 805,815.00
Tukang batu L.02 OH 0.2750 123,300.00 33,907.50
Tukang kayu L.02 OH 1.6500 123,300.00 203,445.00
Tukang besi L.02 OH 1.4700 123,300.00 181,251.00
Kepala tukang L.03 OH 0.4030 141,300.00 56,943.90
Mandor L.04 OH 0.3530 150,300.00 53,055.90
Jumlah Tenaga 1,334,418.30
B BAHAN
Paku 4 - 7 cm kg 4.0000 17,000.00 68,000.00
Besi Beton kg 210.0000 13,000.00 2,730,000.00
Kawat beton kg 3.5000 25,000.00 87,500.00
Semen Portland kg 336.0000 1,300.00 436,800.00
Pasir beton m3 0.5400 300,000.00 162,000.00
Kerikil / Seplit m3 0.8100 300,000.00 243,000.00
Kayu Balok Kelas II M3 0.1500 2,500,000.00 375,000.00
Multiplek 9 mm Lbr 3.5000 150,000.00 525,000.00
Bambu ø 5 - 6 Batang 2.0000 15,000.00 30,000.00
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga 4,678,800.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 6,013,218.30
E OVERHEAD & PROFIT 10% x D 601,321.83
F JUMLAH HARGA PEKERJAAN (D+E) 6,614,540.13
G PEMBULATAN 6,614,600.00

JENIS PEKERJAAN : Kolom 20x20 (210 kg Besi + Bekisting) K-225


SATUAN : 1 m3
KODE : D.18.Hit-a

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 7.0500 114,300.00 805,815.00
Tukang batu L.02 OH 0.2750 123,300.00 33,907.50
Tukang kayu L.02 OH 1.6500 123,300.00 203,445.00
Tukang besi L.02 OH 1.4700 123,300.00 181,251.00
Kepala tukang L.03 OH 0.4030 141,300.00 56,943.90
Mandor L.04 OH 0.3530 150,300.00 53,055.90
Jumlah Tenaga 1,334,418.30
B BAHAN
Paku 4 - 7 cm kg 4.0000 17,000.00 68,000.00
Besi Beton kg 210.0000 13,000.00 2,730,000.00
Kawat beton kg 3.5000 25,000.00 87,500.00
Semen Portland kg 371.0000 1,300.00 482,300.00
Pasir beton m3 0.4986 300,000.00 149,580.00
Kerikil / Seplit m3 0.7440 300,000.00 223,200.00
Kayu Balok Kelas II M3 0.1500 2,500,000.00 375,000.00
Multiplek 9 mm Lbr 3.5000 150,000.00 525,000.00
Bambu ø 5 - 6 Batang 2.0000 15,000.00 30,000.00
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga 4,692,080.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 6,026,498.30
E OVERHEAD & PROFIT 10% x D 602,649.83
F JUMLAH HARGA PEKERJAAN (D+E) 6,629,148.13
G PEMBULATAN 6,629,200.00
JENIS PEKERJAAN : Kolom 20x20 (140 kg Besi + Bekisting) K-175
SATUAN : 1 m3
KODE : D.19.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 7.0500 114,300.00 805,815.00
Tukang batu L.02 OH 0.2750 123,300.00 33,907.50
Tukang kayu L.02 OH 1.6500 123,300.00 203,445.00
Tukang besi L.02 OH 1.4700 123,300.00 181,251.00
Kepala tukang L.03 OH 0.4030 141,300.00 56,943.90
Mandor L.04 OH 0.3530 150,300.00 53,055.90
Jumlah Tenaga 1,334,418.30
B BAHAN
Paku 4 - 7 cm kg 4.0000 17,000.00 68,000.00
Besi Beton kg 140.0000 13,000.00 1,820,000.00
Kawat beton kg 3.5000 25,000.00 87,500.00
Semen Portland kg 326.0000 1,300.00 423,800.00
Pasir beton m3 0.5400 300,000.00 162,000.00
Kerikil / Seplit m3 0.8100 300,000.00 243,000.00
Kayu Balok Kelas II M3 0.1500 2,500,000.00 375,000.00
Multiplek 9 mm Lbr 3.5000 150,000.00 525,000.00
Bambu ø 5 - 6 Batang 2.0000 15,000.00 30,000.00
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga 3,755,800.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 5,090,218.30
E OVERHEAD & PROFIT 10% x D 509,021.83
F JUMLAH HARGA PEKERJAAN (D+E) 5,599,240.13
G PEMBULATAN 5,599,300.00

JENIS PEKERJAAN : Kolom 30x30 (175 kg Besi + Bekisting) K-175


SATUAN : 1 m3
KODE : D.20.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 7.0500 114,300.00 805,815.00
Tukang batu L.02 OH 0.2750 123,300.00 33,907.50
Tukang kayu L.02 OH 1.6500 123,300.00 203,445.00
Tukang besi L.02 OH 1.2250 123,300.00 151,042.50
Kepala tukang L.03 OH 0.4030 141,300.00 56,943.90
Mandor L.04 OH 0.3530 150,300.00 53,055.90
Jumlah Tenaga 1,304,209.80
B BAHAN
Paku 4 - 7 cm kg 4.0000 17,000.00 68,000.00
Besi Beton kg 175.0000 13,000.00 2,275,000.00
Kawat beton kg 2.5000 25,000.00 62,500.00
Semen Portland kg 326.0000 1,300.00 423,800.00
Pasir beton m3 0.5400 300,000.00 162,000.00
Kerikil / Seplit m3 0.8100 300,000.00 243,000.00
Kayu Balok Kelas II M3 0.1500 2,500,000.00 375,000.00
Multiplek 9 mm Lbr 2.5000 150,000.00 375,000.00
Bambu ø 5 - 6 Batang 2.0000 15,000.00 30,000.00
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga 4,035,800.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 5,340,009.80
E OVERHEAD & PROFIT 10% x D 534,000.98
F JUMLAH HARGA PEKERJAAN (D+E) 5,874,010.78
G PEMBULATAN 5,874,100.00

JENIS PEKERJAAN : Kolom 30x30 (175 kg Besi + Bekisting) K-225


SATUAN : 1 m3
KODE : D.20.Hit-a

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 7.0500 114,300.00 805,815.00
Tukang batu L.02 OH 0.2750 123,300.00 33,907.50
Tukang kayu L.02 OH 1.6500 123,300.00 203,445.00
Tukang besi L.02 OH 1.2250 123,300.00 151,042.50
Kepala tukang L.03 OH 0.4030 141,300.00 56,943.90
Mandor L.04 OH 0.3530 150,300.00 53,055.90
Jumlah Tenaga 1,304,209.80
B BAHAN
Paku 4 - 7 cm kg 4.0000 17,000.00 68,000.00
Besi Beton kg 175.0000 13,000.00 2,275,000.00
Kawat beton kg 2.5000 25,000.00 62,500.00
Semen Portland kg 371.0000 1,300.00 482,300.00
Pasir beton m3 0.4986 300,000.00 149,580.00
Kerikil / Seplit m3 0.7440 300,000.00 223,200.00
Kayu Balok Kelas II M3 0.1500 2,500,000.00 375,000.00
Multiplek 9 mm Lbr 2.5000 150,000.00 375,000.00
Bambu ø 5 - 6 Batang 2.0000 15,000.00 30,000.00
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga 4,062,080.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 5,366,289.80
E OVERHEAD & PROFIT 10% x D 536,628.98
F JUMLAH HARGA PEKERJAAN (D+E) 5,902,918.78
G PEMBULATAN 5,903,000.00

JENIS PEKERJAAN : Balok 11x11 (278 kg Besi + Bekisting) K-175


SATUAN : 1 m3
KODE : D.21.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 6.3500 114,300.00 725,805.00
Tukang batu L.02 OH 0.2750 123,300.00 33,907.50
Tukang kayu L.02 OH 1.6500 123,300.00 203,445.00
Tukang besi L.02 OH 1.9460 123,300.00 239,941.80
Kepala tukang L.03 OH 0.3330 141,300.00 47,052.90
Mandor L.04 OH 0.3180 150,300.00 47,795.40
Jumlah Tenaga 1,297,947.60
B BAHAN
Kayu Papan kelas III m3 0.3200 2,100,000.00 672,000.00
Paku 4 - 7 cm kg 3.2000 17,000.00 54,400.00
Besi Beton kg 278.0000 13,000.00 3,614,000.00
Kawat beton kg 3.0000 25,000.00 75,000.00
Semen Portland kg 326.0000 1,300.00 423,800.00
Pasir beton m3 0.5400 300,000.00 162,000.00
Kerikil / Seplit m3 0.8100 300,000.00 243,000.00
Kayu Balok Kelas II m3 0.1400 2,500,000.00 350,000.00
Bambu ø 5 - 6 Batang 2.0000 15,000.00 30,000.00
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga 5,645,700.00
C PERALATAN
Jumlah Alat
D JUMLAH (A+B+C) 6,943,647.60
E OVERHEAD & PROFIT 10% x D 694,364.76
F JUMLAH HARGA PEKERJAAN (D+E) 7,638,012.36
G PEMBULATAN 7,638,100.00

JENIS PEKERJAAN : Balok Topi Beton 12x15 (215 kg Besi + Bekisting) K-175
SATUAN : 1 m3
KODE : D.22.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 6.3500 114,300.00 725,805.00
Tukang batu L.02 OH 0.2750 123,300.00 33,907.50
Tukang kayu L.02 OH 1.6500 123,300.00 203,445.00
Tukang besi L.02 OH 1.9460 123,300.00 239,941.80
Kepala tukang L.03 OH 0.3330 141,300.00 47,052.90
Mandor L.04 OH 0.3180 150,300.00 47,795.40
Jumlah Tenaga 1,297,947.60
B BAHAN
Kayu Papan kelas III m3 0.3200 2,100,000.00 672,000.00
Paku 4 - 7 cm kg 3.2000 17,000.00 54,400.00
Besi Beton kg 215.0000 13,000.00 2,795,000.00
Kawat beton kg 3.0000 25,000.00 75,000.00
Semen Portland kg 326.0000 1,300.00 423,800.00
Pasir beton m3 0.5400 300,000.00 162,000.00
Kerikil / Seplit m3 0.8100 300,000.00 243,000.00
Kayu Balok Kelas II m3 0.1400 2,500,000.00 350,000.00
Bambu ø 5 - 6 Batang 2.0000 15,000.00 30,000.00
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga 4,826,700.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 6,124,647.60
E OVERHEAD & PROFIT 10% x D 612,464.76
F JUMLAH HARGA PEKERJAAN (D+E) 6,737,112.36
G PEMBULATAN 6,737,200.00

JENIS PEKERJAAN : Balok 13x18 (210 kg Besi + Bekisting) K-175


SATUAN : 1 m3
KODE : D.23.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 5.6500 114,300.00 645,795.00
Tukang batu L.02 OH 0.2750 123,300.00 33,907.50
Tukang kayu L.02 OH 1.5600 123,300.00 192,348.00
Tukang besi L.02 OH 1.4700 123,300.00 181,251.00
Kepala tukang L.03 OH 0.3230 141,300.00 45,639.90
Mandor L.04 OH 0.2830 150,300.00 42,534.90
Jumlah Tenaga 1,141,476.30
B BAHAN
Kayu Papan kelas III m3 0.2700 2,100,000.00 567,000.00
Paku 4 - 7 cm kg 2.0000 17,000.00 34,000.00
Besi Beton kg 210.0000 13,000.00 2,730,000.00
Kawat beton kg 3.0000 25,000.00 75,000.00
Semen Portland kg 326.0000 1,300.00 423,800.00
Pasir beton m3 0.5400 300,000.00 162,000.00
Kerikil / Seplit m3 0.8100 300,000.00 243,000.00
Kayu Balok Kelas II m3 0.1400 2,500,000.00 350,000.00
Bambu ø 5 - 6 Batang 2.0000 15,000.00 30,000.00
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga 4,636,300.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 5,777,776.30
E OVERHEAD & PROFIT 10% x D 577,777.63
F JUMLAH HARGA PEKERJAAN (D+E) 6,355,553.93
G PEMBULATAN 6,355,600.00

JENIS PEKERJAAN : Balok 15x25 (175 kg Besi + Bekisting) K-175


SATUAN : 1 m3
KODE : D.24.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 5.6500 114,300.00 645,795.00
Tukang batu L.02 OH 0.2750 123,300.00 33,907.50
Tukang kayu L.02 OH 1.5600 123,300.00 192,348.00
Tukang besi L.02 OH 1.4700 123,300.00 181,251.00
Kepala tukang L.03 OH 0.3230 141,300.00 45,639.90
Mandor L.04 OH 0.2830 150,300.00 42,534.90
Jumlah Tenaga 1,141,476.30
B BAHAN
Kayu Papan kelas III m3 0.2700 2,100,000.00 567,000.00
Paku 4 - 7 cm kg 2.0000 17,000.00 34,000.00
Besi Beton kg 175.0000 13,000.00 2,275,000.00
Kawat beton kg 3.0000 25,000.00 75,000.00
Semen Portland kg 326.0000 1,300.00 423,800.00
Pasir beton m3 0.5400 300,000.00 162,000.00
Kerikil / Seplit m3 0.8100 300,000.00 243,000.00
Kayu Balok Kelas II m3 0.1400 2,500,000.00 350,000.00
Bambu ø 5 - 6 Batang 2.0000 15,000.00 30,000.00
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga 4,181,300.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 5,322,776.30
E OVERHEAD & PROFIT 10% x D 532,277.63
F JUMLAH HARGA PEKERJAAN (D+E) 5,855,053.93
G PEMBULATAN 5,855,100.00

JENIS PEKERJAAN : Balok Portal 13x18 (210 kg Besi + Bekisting) K-175


SATUAN : 1 m3
KODE : D.25.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 5.6500 114,300.00 645,795.00
Tukang batu L.02 OH 0.2750 123,300.00 33,907.50
Tukang kayu L.02 OH 1.5600 123,300.00 192,348.00
Tukang besi L.02 OH 1.4700 123,300.00 181,251.00
Kepala tukang L.03 OH 0.3230 141,300.00 45,639.90
Mandor L.04 OH 0.2830 150,300.00 42,534.90
Jumlah Tenaga 1,141,476.30
B BAHAN
Kayu Papan kelas III m3 0.2700 2,100,000.00 567,000.00
Paku 4 - 7 cm kg 2.0000 17,000.00 34,000.00
Besi Beton kg 210.0000 13,000.00 2,730,000.00
Kawat beton kg 3.0000 25,000.00 75,000.00
Semen Portland kg 326.0000 1,300.00 423,800.00
Pasir beton m3 0.5400 300,000.00 162,000.00
Kerikil / Seplit m3 0.8100 300,000.00 243,000.00
Kayu Balok Kelas II m3 0.1750 2,500,000.00 437,500.00
Bambu ø 5 - 6 Batang 4.0000 15,000.00 60,000.00
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga 4,753,800.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 5,895,276.30
E OVERHEAD & PROFIT 10% x D 589,527.63
F JUMLAH HARGA PEKERJAAN (D+E) 6,484,803.93
G PEMBULATAN 6,484,900.00

JENIS PEKERJAAN : Balok 20x30 (175 kg Besi + Bekisting) K-225


SATUAN : 1 m3
KODE : D.26.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 7.3000 114,300.00 834,390.00
Tukang batu L.02 OH 0.3500 123,300.00 43,155.00
Tukang kayu L.02 OH 3.3000 123,300.00 406,890.00
Tukang besi L.02 OH 1.2250 123,300.00 151,042.50
Kepala tukang L.03 OH 0.5700 141,300.00 80,541.00
Mandor L.04 OH 0.2500 150,300.00 37,575.00
Jumlah Tenaga 1,553,593.50
B BAHAN
Paku 4 - 7 cm kg 3.2000 17,000.00 54,400.00
Besi Beton kg 175.0000 13,000.00 2,275,000.00
Kawat beton kg 2.5000 25,000.00 62,500.00
Semen Portland kg 371.0000 1,300.00 482,300.00
Pasir beton m3 0.4986 300,000.00 149,580.00
Kerikil / Seplit m3 0.7440 300,000.00 223,200.00
Kayu Balok Kelas II m3 0.1750 2,500,000.00 437,500.00
Multiplek 9 mm Lembar 3.5000 150,000.00 525,000.00
Bambu ø 5 - 6 Batang 4.0000 15,000.00 60,000.00
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga 4,290,980.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 5,844,573.50
E OVERHEAD & PROFIT 10% x D 584,457.35
F JUMLAH HARGA PEKERJAAN (D+E) 6,429,030.85
G PEMBULATAN 6,429,100.00

JENIS PEKERJAAN : Balok 20x30 (175 kg Besi + Bekisting) K-175


SATUAN : 1 m3
KODE : D.26.Hit-a

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 7.3000 114,300.00 834,390.00
Tukang batu L.02 OH 0.3500 123,300.00 43,155.00
Tukang kayu L.02 OH 3.3000 123,300.00 406,890.00
Tukang besi L.02 OH 1.2250 123,300.00 151,042.50
Kepala tukang L.03 OH 0.5700 141,300.00 80,541.00
Mandor L.04 OH 0.2500 150,300.00 37,575.00
Jumlah Tenaga 1,553,593.50
B BAHAN
Paku 4 - 7 cm kg 3.2000 17,000.00 54,400.00
Besi Beton kg 175.0000 13,000.00 2,275,000.00
Kawat beton kg 2.5000 25,000.00 62,500.00
Semen Portland kg 326.0000 1,300.00 423,800.00
Pasir beton m3 0.5429 300,000.00 162,870.00
Kerikil / Seplit m3 0.7440 300,000.00 223,200.00
Kayu Balok Kelas II m3 0.1750 2,500,000.00 437,500.00
Multiplek 9 mm Lembar 3.5000 150,000.00 525,000.00
Bambu ø 5 - 6 Batang 4.0000 15,000.00 60,000.00
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga 4,245,770.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 5,799,363.50
E OVERHEAD & PROFIT 10% x D 579,936.35
F JUMLAH HARGA PEKERJAAN (D+E) 6,379,299.85
G PEMBULATAN 6,379,300.00

JENIS PEKERJAAN : Balok 30x60 (125 kg Besi + Bekisting) K-225


SATUAN : 1 m3
KODE : D.27.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 7.3000 114,300.00 834,390.00
Tukang batu L.02 OH 0.3500 123,300.00 43,155.00
Tukang kayu L.02 OH 3.3000 123,300.00 406,890.00
Tukang besi L.02 OH 0.8750 123,300.00 107,887.50
Kepala tukang L.03 OH 0.5700 141,300.00 80,541.00
Mandor L.04 OH 0.2500 150,300.00 37,575.00
Jumlah Tenaga 1,510,438.50
B BAHAN
Paku 4 - 7 cm kg 3.2000 17,000.00 54,400.00
Besi Beton kg 125.0000 13,000.00 1,625,000.00
Kawat beton kg 2.5000 25,000.00 62,500.00
Semen Portland kg 371.0000 1,300.00 482,300.00
Pasir beton m3 0.4986 300,000.00 149,580.00
Kerikil / Seplit m3 0.7440 300,000.00 223,200.00
Kayu Balok Kelas II m3 0.1750 2,500,000.00 437,500.00
Multiplek 9 mm Lembar 3.5000 150,000.00 525,000.00
Bambu ø 5 - 6 Batang 4.0000 15,000.00 60,000.00
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga 3,640,980.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 5,151,418.50
E OVERHEAD & PROFIT 10% x D 515,141.85
F JUMLAH HARGA PEKERJAAN (D+E) 5,666,560.35
G PEMBULATAN 5,666,600.00

JENIS PEKERJAAN : Plat Beton tb. 12cm (110 kg Besi + Bekisting) K-225
SATUAN : 1 m3
KODE : D.28.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 5.3000 114,300.00 605,790.00
Tukang batu L.02 OH 0.2750 123,300.00 33,907.50
Tukang kayu L.02 OH 1.3000 123,300.00 160,290.00
Tukang besi L.02 OH 0.7700 123,300.00 94,941.00
Kepala tukang L.03 OH 0.2650 141,300.00 37,444.50
Mandor L.04 OH 0.2650 150,300.00 39,829.50
Jumlah Tenaga 972,202.50
B BAHAN
Paku 4 - 7 cm kg 3.2000 17,000.00 54,400.00
Besi Beton kg 110.0000 13,000.00 1,430,000.00
Kawat beton kg 2.2500 25,000.00 56,250.00
Semen Portland kg 371.0000 1,300.00 482,300.00
Pasir beton m3 0.4986 300,000.00 149,580.00
Kerikil / Seplit m3 0.7440 300,000.00 223,200.00
Kayu Balok Kelas II m3 0.1750 2,500,000.00 437,500.00
Multiplek 9 mm Lembar 3.5000 150,000.00 525,000.00
Bambu ø 5 - 6 Batang 6.0000 15,000.00 90,000.00
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga 3,469,730.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 4,441,932.50
E OVERHEAD & PROFIT 10% x D 444,193.25
F JUMLAH HARGA PEKERJAAN (D+E) 4,886,125.75
G PEMBULATAN 4,886,200.00

JENIS PEKERJAAN : Plat Beton tb. 12cm (110 kg Besi + Bekisting Bondek) K-225
SATUAN : 1 m3
KODE : D.28.Hit-a

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 5.3000 114,300.00 605,790.00
Tukang batu L.02 OH 0.2750 123,300.00 33,907.50
Tukang kayu L.02 OH 1.3000 123,300.00 160,290.00
Tukang besi L.02 OH 0.7700 123,300.00 94,941.00
Kepala tukang L.03 OH 0.2650 141,300.00 37,444.50
Mandor L.04 OH 0.2650 150,300.00 39,829.50
Jumlah Tenaga 972,202.50
B BAHAN
Paku 4 - 7 cm kg 1.0000 17,000.00 17,000.00
Besi Beton kg 110.0000 13,000.00 1,430,000.00
Kawat beton kg 2.2500 25,000.00 56,250.00
Semen Portland kg 371.0000 1,300.00 482,300.00
Pasir beton m3 0.4986 300,000.00 149,580.00
Kerikil / Seplit m3 0.7440 300,000.00 223,200.00
Kayu Balok Kelas II m3 0.0630 2,500,000.00 157,500.00
Multiplek 9 mm Lembar 0.2500 150,000.00 37,500.00
Bondek / Floordeck Lembar 1.5000 600,000.00 900,000.00
Bambu ø 5 - 6 Batang 6.0000 15,000.00 90,000.00
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga 3,564,830.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 4,537,032.50
E OVERHEAD & PROFIT 10% x D 453,703.25
F JUMLAH HARGA PEKERJAAN (D+E) 4,990,735.75
G PEMBULATAN 4,990,800.00

JENIS PEKERJAAN : Plat Beton tb. 12cm (110 kg Besi + Bekisting) K-175
SATUAN : 1 m3
KODE : D.28.Hit-b

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 5.3000 114,300.00 605,790.00
Tukang batu L.02 OH 0.2750 123,300.00 33,907.50
Tukang kayu L.02 OH 1.3000 123,300.00 160,290.00
Tukang besi L.02 OH 0.7700 123,300.00 94,941.00
Kepala tukang L.03 OH 0.2650 141,300.00 37,444.50
Mandor L.04 OH 0.2650 150,300.00 39,829.50
Jumlah Tenaga 972,202.50
B BAHAN
Paku 4 - 7 cm kg 1.0000 17,000.00 17,000.00
Besi Beton kg 110.0000 13,000.00 1,430,000.00
Kawat beton kg 2.2500 25,000.00 56,250.00
Semen Portland kg 326.0000 1,300.00 423,800.00
Pasir beton m3 0.5400 300,000.00 162,000.00
Kerikil / Seplit m3 0.8100 300,000.00 243,000.00
Kayu Balok Kelas II m3 0.1750 2,500,000.00 437,500.00
Multiplek 9 mm Lembar 3.5000 150,000.00 525,000.00
Bambu ø 5 - 6 Batang 6.0000 15,000.00 90,000.00
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga 3,406,050.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 4,378,252.50
E OVERHEAD & PROFIT 10% x D 437,825.25
F JUMLAH HARGA PEKERJAAN (D+E) 4,816,077.75
G PEMBULATAN 4,816,100.00

JENIS PEKERJAAN : Plat Beton tb. 8cm (50 kg besi + Bekisting) K-175
SATUAN : 1 m3
KODE : D.29.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 2.6500 114,300.00 302,895.00
Tukang batu L.02 OH 0.2750 123,300.00 33,907.50
Tukang kayu L.02 OH 0.6500 123,300.00 80,145.00
Tukang besi L.02 OH 0.3500 123,300.00 43,155.00
Kepala tukang L.03 OH 0.2650 141,300.00 37,444.50
Mandor L.04 OH 0.2650 150,300.00 39,829.50
Jumlah Tenaga 537,376.50
B BAHAN
Paku 4 - 7 cm kg 1.6000 17,000.00 27,200.00
Besi Beton kg 50.0000 13,000.00 650,000.00
Kawat beton kg 1.1250 25,000.00 28,125.00
Semen Portland kg 326.0000 1,300.00 423,800.00
Pasir beton m3 0.5400 300,000.00 162,000.00
Kerikil / Seplit m3 0.8100 300,000.00 243,000.00
Kayu Balok Kelas II m3 0.1750 2,500,000.00 437,500.00
Multiplek 9 mm Lembar 3.5000 150,000.00 525,000.00
Bambu ø 5 - 6 Batang 4.0000 15,000.00 60,000.00
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga 2,578,125.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 3,115,501.50
E OVERHEAD & PROFIT 10% x D 311,550.15
F JUMLAH HARGA PEKERJAAN (D+E) 3,427,051.65
G PEMBULATAN 3,427,100.00

JENIS PEKERJAAN : Plat Beton tb. 8cm (50 kg besi + Bekisting) K-225
SATUAN : 1 m3
KODE : D.29.Hit-a

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 2.6500 114,300.00 302,895.00
Tukang batu L.02 OH 0.2750 123,300.00 33,907.50
Tukang kayu L.02 OH 0.6500 123,300.00 80,145.00
Tukang besi L.02 OH 0.3500 123,300.00 43,155.00
Kepala tukang L.03 OH 0.2650 141,300.00 37,444.50
Mandor L.04 OH 0.2650 150,300.00 39,829.50
Jumlah Tenaga 537,376.50
B BAHAN
Paku 4 - 7 cm kg 1.6000 17,000.00 27,200.00
Besi Beton kg 50.0000 13,000.00 650,000.00
Kawat beton kg 1.1250 25,000.00 28,125.00
Semen Portland kg 371.0000 1,300.00 482,300.00
Pasir beton m3 0.4986 300,000.00 149,580.00
Kerikil / Seplit m3 0.7440 300,000.00 223,200.00
Kayu Balok Kelas II m3 0.1750 2,500,000.00 437,500.00
Multiplek 9 mm Lembar 3.5000 150,000.00 525,000.00
Bambu ø 5 - 6 Batang 4.0000 15,000.00 60,000.00
Air Liter 215.0000 100.00 21,500.00
Jumlah Harga 2,604,405.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 3,141,781.50
E OVERHEAD & PROFIT 10% x D 314,178.15
F JUMLAH HARGA PEKERJAAN (D+E) 3,455,959.65
G PEMBULATAN 3,456,000.00

JENIS PEKERJAAN : Dinding Beton (150 kg Besi + Bekisting) K-175


SATUAN : 1 m3
KODE : D.30.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 5.3000 114,300.00 605,790.00
Tukang batu L.02 OH 0.2750 123,300.00 33,907.50
Tukang kayu L.02 OH 1.3000 123,300.00 160,290.00
Tukang besi L.02 OH 1.0500 123,300.00 129,465.00
Kepala tukang L.03 OH 0.2620 141,300.00 37,020.60
Mandor L.04 OH 0.2650 150,300.00 39,829.50
Jumlah Tenaga 1,006,302.60
B BAHAN
Paku 4 - 7 cm kg 3.2000 17,000.00 54,400.00
Besi Beton kg 150.0000 13,000.00 1,950,000.00
Kawat beton kg 2.2500 25,000.00 56,250.00
Semen Portland kg 326.0000 1,300.00 423,800.00
Pasir beton m3 0.5400 300,000.00 162,000.00
Kerikil / Seplit m3 0.8100 300,000.00 243,000.00
Kayu Balok Kelas II m3 0.1600 2,500,000.00 400,000.00
Multiplek 9 mm Lembar 2.8000 150,000.00 420,000.00
Bambu ø 5 - 6 Batang 24.0000 15,000.00 360,000.00
Jumlah Harga 4,069,450.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 5,075,752.60
E OVERHEAD & PROFIT 10% x D 507,575.26
F JUMLAH HARGA PEKERJAAN (D+E) 5,583,327.86
G PEMBULATAN 5,583,400.00

JENIS PEKERJAAN : Dinding Beton (200 kg Besi + Bekisting) K-175


SATUAN : 1 m3
KODE : D.31.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 5.6500 114,300.00 645,795.00
Tukang batu L.02 OH 0.2750 123,300.00 33,907.50
Tukang kayu L.02 OH 1.5600 123,300.00 192,348.00
Tukang besi L.02 OH 1.4000 123,300.00 172,620.00
Kepala tukang L.03 OH 0.3230 141,300.00 45,639.90
Mandor L.04 OH 0.2830 150,300.00 42,534.90
Jumlah Tenaga 1,132,845.30
B BAHAN
Paku 4 - 7 cm kg 0.3000 17,000.00 5,100.00
Besi Beton kg 200.0000 13,000.00 2,600,000.00
Kawat beton kg 3.0000 25,000.00 75,000.00
Semen Portland kg 326.0000 1,300.00 423,800.00
Pasir beton m3 0.5400 300,000.00 162,000.00
Kerikil / Seplit m3 0.8100 300,000.00 243,000.00
Kayu Balok Kelas II m3 0.1050 2,500,000.00 262,500.00
Multiplek 9 mm Lembar 2.5000 150,000.00 375,000.00
Bambu ø 5 - 6 Batang 14.0000 15,000.00 210,000.00
Jumlah Harga 4,356,400.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 5,489,245.30
E OVERHEAD & PROFIT 10% x D 548,924.53
F JUMLAH HARGA PEKERJAAN (D+E) 6,038,169.83
G PEMBULATAN 6,038,200.00
F. HARGA SATUAN PEKERJAAN DINDING

JENIS PEKERJAAN : Bata Merah 1 Bata 1:3


SATUAN : 1 m2
KODE : F.1.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.6000 114,300.00 68,580.00
Tukang Batu L.02 OH 0.2000 123,300.00 24,660.00
Kepala Tukang L.03 OH 0.0200 141,300.00 2,826.00
Mandor L.04 OH 0.0300 150,300.00 4,509.00
Jumlah Tenaga 100,575.00
B BAHAN
Bata merah bh 140.0000 900.00 126,000.00
Semen Portland Kg 32.9500 1,300.00 42,835.00
Pasir Pasang m3 0.0910 300,000.00 27,300.00
Jumlah Bahan 196,135.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 296,710.00
E OVERHEAD & PROFIT 10% x D 29,671.00
F JUMLAH HARGA PEKERJAAN (D+E) 326,381.00
G PEMBULATAN 326,400.00

JENIS PEKERJAAN : Bata Merah 1 Bata 1:5


SATUAN : 1 m2
KODE : F.2.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.6000 114,300.00 68,580.00
Tukang Batu L.02 OH 0.2000 123,300.00 24,660.00
Kepala Tukang L.03 OH 0.0200 141,300.00 2,826.00
Mandor L.04 OH 0.0300 150,300.00 4,509.00
Jumlah Tenaga 100,575.00
B BAHAN
Bata merah bh 140.0000 900.00 126,000.00
Semen Portland Kg 22.2000 1,300.00 28,860.00
Pasir Pasang m3 0.1020 300,000.00 30,600.00
Jumlah Bahan 185,460.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 286,035.00
E OVERHEAD & PROFIT 10% x D 28,603.50
F JUMLAH HARGA PEKERJAAN (D+E) 314,638.50
G PEMBULATAN 314,700.00

JENIS PEKERJAAN : Bata Merah 1/2 Bata 1:3


SATUAN : 1 m2
KODE : F.3.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.3000 114,300.00 34,290.00
Tukang Batu L.02 OH 0.1000 123,300.00 12,330.00
Kepala Tukang L.03 OH 0.0100 141,300.00 1,413.00
Mandor L.04 OH 0.0150 150,300.00 2,254.50
Jumlah Tenaga 50,287.50
B BAHAN
Bata merah bh 70.0000 900.00 63,000.00
Semen Portland Kg 14.3700 1,300.00 18,681.00
Pasir Pasang m3 0.0400 300,000.00 12,000.00
Jumlah Bahan 93,681.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 143,968.50
E OVERHEAD & PROFIT 10% x D 14,396.85
F JUMLAH HARGA PEKERJAAN (D+E) 158,365.35
G PEMBULATAN 158,400.00

JENIS PEKERJAAN : Bata Merah 1/2 Bata 1:5


SATUAN : 1 m2
KODE : F.4.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.3000 114,300.00 34,290.00
Tukang Batu L.02 OH 0.1000 123,300.00 12,330.00
Kepala Tukang L.03 OH 0.0100 141,300.00 1,413.00
Mandor L.04 OH 0.0150 150,300.00 2,254.50
Jumlah Tenaga 50,287.50
B BAHAN
Bata merah bh 70.0000 900.00 63,000.00
Semen Portland Kg 9.6800 1,300.00 12,584.00
Pasir Pasang m3 0.0450 300,000.00 13,500.00
Jumlah Bahan 89,084.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 139,371.50
E OVERHEAD & PROFIT 10% x D 13,937.15
F JUMLAH HARGA PEKERJAAN (D+E) 153,308.65
G PEMBULATAN 153,400.00

JENIS PEKERJAAN : Dinding Partisi Double GRC 4mm + Rangka Baja Ringan
SATUAN : 1 m2
KODE : F.5.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.2000 114,300.00 22,860.00
Tukang Batu L.02 OH 0.6000 123,300.00 73,980.00
Kepala Tukang L.03 OH 0.0600 141,300.00 8,478.00
Mandor L.04 OH 0.0100 150,300.00 1,503.00
Jumlah Tenaga 106,821.00
B BAHAN
Baja Ringan (Main Truss C 75 tb. 0,75 mm) m1 5.5000 12,500.00 68,750.00
GRC Lembar 0.8600 72,000.00 61,920.00
Screw GRC Kg 0.1500 75,000.00 11,250.00
Assesories 10% % 0.1000 130,670.00 13,067.00
Jumlah Bahan 154,987.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 261,808.00
E OVERHEAD & PROFIT 10% x D 26,180.80
F JUMLAH HARGA PEKERJAAN (D+E) 287,988.80
G PEMBULATAN 288,000.00
G. HARGA SATUAN PEKERJAAN PLESTERAN

JENIS PEKERJAAN : Plesteran 1:3 tebal 15mm


SATUAN : 1 m2
KODE : G.1.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.3000 114,300.00 34,290.00
Tukang Batu L.03 OH 0.1500 123,300.00 18,495.00
Kepala Tukang L.03 OH 0.0150 141,300.00 2,119.50
Mandor L.04 OH 0.0150 150,300.00 2,254.50
Jumlah Tenaga 57,159.00
B BAHAN
Semen Portland Kg 7.7760 1,300.00 10,108.80
Pasir pasang m3 0.0230 300,000.00 6,900.00
Jumlah Bahan 17,008.80
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 74,167.80
E OVERHEAD & PROFIT 10% x D 7,416.78
F JUMLAH HARGA PEKERJAAN (D+E) 81,584.58
G PEMBULATAN 81,600.00

JENIS PEKERJAAN : Plesteran 1:5 tebal 15 mm


SATUAN : 1 m2
KODE : G.2.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.3000 114,300.00 34,290.00
Tukang Batu L.03 OH 0.1500 123,300.00 18,495.00
Kepala Tukang L.03 OH 0.0150 141,300.00 2,119.50
Mandor L.04 OH 0.0150 150,300.00 2,254.50
Jumlah Tenaga 57,159.00
B BAHAN
Semen Portland Kg 5.1840 1,300.00 6,739.20
Pasir pasang m3 0.0260 300,000.00 7,800.00
Jumlah Bahan 14,539.20
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 71,698.20
E OVERHEAD & PROFIT 10% x D 7,169.82
F JUMLAH HARGA PEKERJAAN (D+E) 78,868.02
G PEMBULATAN 78,900.00

JENIS PEKERJAAN : Plesteran 1:3 tebal 20 mm


SATUAN : 1 m2
KODE : G.3.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.2600 114,300.00 29,718.00
Tukang Batu L.03 OH 0.2000 123,300.00 24,660.00
Kepala Tukang L.03 OH 0.0200 141,300.00 2,826.00
Mandor L.04 OH 0.0130 150,300.00 1,953.90
Jumlah Tenaga 59,157.90
B BAHAN
Semen Portland Kg 10.3680 1,300.00 13,478.40
Pasir pasang m3 0.0310 300,000.00 9,300.00
Jumlah Bahan 22,778.40
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 81,936.30
E OVERHEAD & PROFIT 10% x D 8,193.63
F JUMLAH HARGA PEKERJAAN (D+E) 90,129.93
G PEMBULATAN 90,200.00

JENIS PEKERJAAN : Plesteran 1:5 tebal 20 mm


SATUAN : 1 m2
KODE : G.4.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.4000 114,300.00 45,720.00
Tukang Batu L.03 OH 0.2000 123,300.00 24,660.00
Kepala Tukang L.03 OH 0.0200 141,300.00 2,826.00
Mandor L.04 OH 0.0220 150,300.00 3,306.60
Jumlah Tenaga 76,512.60
B BAHAN
Semen Portland Kg 6.9120 1,300.00 8,985.60
Pasir pasang m3 0.0350 300,000.00 10,500.00
Jumlah Bahan 19,485.60
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 95,998.20
E OVERHEAD & PROFIT 10% x D 9,599.82
F JUMLAH HARGA PEKERJAAN (D+E) 105,598.02
G PEMBULATAN 105,600.00

JENIS PEKERJAAN : Plesteran Skoneng 1:3 lebar 10 cm


SATUAN : 1 m2
KODE : G.5.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.0800 114,300.00 9,144.00
Tukang Batu L.03 OH 0.4000 123,300.00 49,320.00
Kepala Tukang L.03 OH 0.0400 141,300.00 5,652.00
Mandor L.04 OH 0.0040 150,300.00 601.20
Jumlah Tenaga 64,717.20
B BAHAN
Semen Portland kg 0.5000 1,300.00 650.00
Pasir pasang m3 0.0130 300,000.00 3,900.00
Jumlah Bahan 4,550.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 69,267.20
E OVERHEAD & PROFIT 10% x D 6,926.72
F JUMLAH HARGA PEKERJAAN (D+E) 76,193.92
G PEMBULATAN 76,200.00

JENIS PEKERJAAN : Plesteran Ciprat 1:2


SATUAN : 1 m2
KODE : G.6.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.3000 114,300.00 34,290.00
Tukang Batu L.03 OH 0.1000 123,300.00 12,330.00
Kepala Tukang L.03 OH 0.0100 141,300.00 1,413.00
Mandor L.04 OH 0.0150 150,300.00 2,254.50
Jumlah Tenaga 50,287.50
B BAHAN
Semen Portland Kg 4.3200 1,300.00 5,616.00
Pasir pasang m3 0.0060 300,000.00 1,800.00
Jumlah Bahan 7,416.00
C PERALATAN

Jumlah Alat

D JUMLAH (A+B+C) 57,703.50


E OVERHEAD & PROFIT 10% x D 5,770.35
F JUMLAH HARGA PEKERJAAN (D+E) 63,473.85
G PEMBULATAN 63,500.00

JENIS PEKERJAAN : Siar Batu Kali 1:2


SATUAN : 1 m2
KODE : G.7.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.3000 114,300.00 34,290.00
Tukang Batu L.03 OH 0.1500 123,300.00 18,495.00
Kepala Tukang L.03 OH 0.0150 141,300.00 2,119.50
Mandor L.04 OH 0.0150 150,300.00 2,254.50
Jumlah Tenaga 57,159.00
B BAHAN
Semen Portland Kg 6.3400 1,300.00 8,242.00
Pasir pasang m3 0.0120 300,000.00 3,600.00
Jumlah Bahan 11,842.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 69,001.00
E OVERHEAD & PROFIT 10% x D 6,900.10
F JUMLAH HARGA PEKERJAAN (D+E) 75,901.10
G PEMBULATAN 76,000.00

JENIS PEKERJAAN : Acian


SATUAN : 1 m2
KODE : G.8.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.2000 114,300.00 22,860.00
Tukang Batu L.03 OH 0.1000 123,300.00 12,330.00
Kepala Tukang L.03 OH 0.0100 141,300.00 1,413.00
Mandor L.04 OH 0.0100 150,300.00 1,503.00
Jumlah Tenaga 38,106.00
B BAHAN
Semen Portland Kg 3.2500 1,300.00 4,225.00
Jumlah Bahan 4,225.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 42,331.00
E OVERHEAD & PROFIT 10% x D 4,233.10
F JUMLAH HARGA PEKERJAAN (D+E) 46,564.10
G PEMBULATAN 46,600.00
H. HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN DINDING
JENIS PEKERJAAN : Lantai Keramik 30x30 Polos (Bahan dan Merk Sesuai RKS)
SATUAN : 1 m2
KODE : H.1.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.2600 114,300.00 29,718.00
Tukang Batu L.02 OH 0.1300 123,300.00 16,029.00
Kepala tukang L.03 OH 0.0130 141,300.00 1,836.90
Mandor L.04 OH 0.0130 150,300.00 1,953.90
Jumlah Tenaga 49,537.80
B BAHAN
Keramik 30 x 30 Polos setara Mulia m2 1.1000 45,000.00 49,500.00
Semen Portland Kg 10.0000 1,300.00 13,000.00
Pasir pasang M3 0.0450 300,000.00 13,500.00
Semen warna Kg 1.5000 20,000.00 30,000.00
Jumlah Bahan 106,000.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 155,537.80
E OVERHEAD & PROFIT 10% x D 15,553.78
F JUMLAH HARGA PEKERJAAN (D+E) 171,091.58
G PEMBULATAN 171,100.00

JENIS PEKERJAAN : Lantai Keramik 30x30 Corak Anti Slip (Bahan dan Merk Sesuai RKS)
SATUAN : 1 m2
KODE : H.2.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.2600 114,300.00 29,718.00
Tukang Batu L.02 OH 0.1300 123,300.00 16,029.00
Kepala tukang L.03 OH 0.0130 141,300.00 1,836.90
Mandor L.04 OH 0.0130 150,300.00 1,953.90
Jumlah Tenaga 49,537.80
B BAHAN
Keramik 30 x 30 Corak setara Mulia m2 1.1000 55,000.00 60,500.00
Semen Portland Kg 10.0000 1,300.00 13,000.00
Pasir pasang M3 0.0450 300,000.00 13,500.00
Semen warna Kg 1.5000 20,000.00 30,000.00
Jumlah Bahan 117,000.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 166,537.80
E OVERHEAD & PROFIT 10% x D 16,653.78
F JUMLAH HARGA PEKERJAAN (D+E) 183,191.58
G PEMBULATAN 183,200.00

JENIS PEKERJAAN : Lantai Keramik 40x40 Polos (Bahan dan Merk Sesuai RKS)
SATUAN : 1 m2
KODE : H.3.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.2500 114,300.00 28,575.00
Tukang Batu L.02 OH 0.1250 123,300.00 15,412.50
Kepala tukang L.03 OH 0.0130 141,300.00 1,836.90
Mandor L.04 OH 0.0130 150,300.00 1,953.90
Jumlah Tenaga 47,778.30
B BAHAN
Keramik 40 x 40 Polos setara Mulia m2 1.1000 65,000.00 71,500.00
Semen Portland Kg 9.8000 1,300.00 12,740.00
Pasir pasang M3 0.0450 300,000.00 13,500.00
Semen warna Kg 1.3000 20,000.00 26,000.00
Jumlah Bahan 123,740.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 171,518.30
E OVERHEAD & PROFIT 10% x D 17,151.83
F JUMLAH HARGA PEKERJAAN (D+E) 188,670.13
G PEMBULATAN 188,700.00

JENIS PEKERJAAN : Lantai Keramik 20x20 Corak Anti Slip (Bahan dan Merk Sesuai RKS)
SATUAN : 1 m2
KODE : H.4.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.2600 114,300.00 29,718.00
Tukang Batu L.02 OH 0.1300 123,300.00 16,029.00
Kepala tukang L.03 OH 0.0130 141,300.00 1,836.90
Mandor L.04 OH 0.0130 150,300.00 1,953.90
Jumlah Tenaga 49,537.80
B BAHAN
Keramik 20 x 20 Corak setara Mulia m2 1.1000 65,000.00 71,500.00
Semen Portland Kg 10.4000 1,300.00 13,520.00
Pasir pasang M3 0.0450 300,000.00 13,500.00
Semen warna Kg 1.6200 20,000.00 32,400.00
Jumlah Bahan 130,920.00
C PERALATAN

Jumlah Alat

D JUMLAH (A+B+C) 180,457.80


E OVERHEAD & PROFIT 10% x D 18,045.78
F JUMLAH HARGA PEKERJAAN (D+E) 198,503.58
G PEMBULATAN 198,600.00

JENIS PEKERJAAN : Dinding Keramik 20x25 Corak (Bahan dan Merk Sesuai RKS)
SATUAN : 1 m2
KODE : H.5.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.9000 114,300.00 102,870.00
Tukang Batu L.02 OH 0.4500 123,300.00 55,485.00
Kepala tukang L.03 OH 0.0450 141,300.00 6,358.50
Mandor L.04 OH 0.0450 150,300.00 6,763.50
Jumlah Tenaga 171,477.00
B BAHAN
Keramik 20 x 25 Corak Setara Mulia m2 1.1000 76,000.00 83,600.00
Semen Portland Kg 9.3000 1,300.00 12,090.00
Pasir Pasang M3 0.0180 300,000.00 5,400.00
Semen warna Kg 1.9400 20,000.00 38,800.00
Jumlah Bahan 139,890.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 311,367.00
E OVERHEAD & PROFIT 10% x D 31,136.70
F JUMLAH HARGA PEKERJAAN (D+E) 342,503.70
G PEMBULATAN 342,600.00

JENIS PEKERJAAN : Dinding Granite 30x60 Corak (Bahan dan Merk Sesuai RKS)
SATUAN : 1 m2
KODE : H.5.Hit-a

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.9000 114,300.00 102,870.00
Tukang Batu L.02 OH 0.4500 123,300.00 55,485.00
Kepala tukang L.03 OH 0.0450 141,300.00 6,358.50
Mandor L.04 OH 0.0450 150,300.00 6,763.50
Jumlah Tenaga 171,477.00
B BAHAN
Granite 30 x 60 m2 1.1000 200,000.00 220,000.00
Semen Portland Kg 9.3000 1,300.00 12,090.00
Pasir Pasang M3 0.0180 300,000.00 5,400.00
Semen warna Kg 1.9400 20,000.00 38,800.00
Jumlah Bahan 276,290.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 447,767.00
E OVERHEAD & PROFIT 10% x D 44,776.70
F JUMLAH HARGA PEKERJAAN (D+E) 492,543.70
G PEMBULATAN 492,600.00

JENIS PEKERJAAN : Dinding Keramik 10x20 Corak (Bahan dan Merk Sesuai RKS)
SATUAN : 1 m2
KODE : H.6.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.9000 114,300.00 102,870.00
Tukang Batu L.02 OH 0.4500 123,300.00 55,485.00
Kepala tukang L.03 OH 0.0450 141,300.00 6,358.50
Mandor L.04 OH 0.0450 150,300.00 6,763.50
Jumlah Tenaga 171,477.00
B BAHAN
Keramik 10 x 20 Corak setara Mulia m2 1.1000 70,000.00 77,000.00
Semen Portland Kg 10.0000 1,300.00 13,000.00
Pasir Pasang M3 0.0450 300,000.00 13,500.00
Semen warna Kg 1.5000 20,000.00 30,000.00
Jumlah Bahan 133,500.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 304,977.00
E OVERHEAD & PROFIT 10% x D 30,497.70
F JUMLAH HARGA PEKERJAAN (D+E) 335,474.70
G PEMBULATAN 335,500.00

JENIS PEKERJAAN : Dinding Batu Tempel Hitam


SATUAN : 1 m2
KODE : H.7.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.3500 114,300.00 40,005.00
Tukang Batu L.02 OH 0.3500 123,300.00 43,155.00
Kepala tukang L.03 OH 0.0350 141,300.00 4,945.50
Mandor L.04 OH 0.0350 150,300.00 5,260.50
Jumlah Tenaga 93,366.00
B BAHAN
Batu Tempel Hitam m2 1.1000 125,000.00 137,500.00
Semen Portland Kg 9.3000 1,300.00 12,090.00
Pasir Pasang M3 0.0180 300,000.00 5,400.00
Jumlah Bahan 154,990.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 248,356.00
E OVERHEAD & PROFIT 10% x D 24,835.60
F JUMLAH HARGA PEKERJAAN (D+E) 273,191.60
G PEMBULATAN 273,200.00

JENIS PEKERJAAN : Paving Block Natural 8cm


SATUAN : 1 m2
KODE : H.8.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.2500 114,300.00 28,575.00
Tukang Batu L.02 OH 0.5000 123,300.00 61,650.00
Kepala tukang L.03 OH 0.0250 141,300.00 3,532.50
Mandor L.04 OH 0.0025 150,300.00 375.75
Jumlah Tenaga 94,133.25
B BAHAN
Paving Blok Natural 8cm m2 1.1000 165,000.00 181,500.00
Pasir Urug m3 0.0500 200,000.00 10,000.00
Abu Batu m3 0.0500 300,000.00 15,000.00
Jumlah Bahan 206,500.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 300,633.25
E OVERHEAD & PROFIT 10% x D 30,063.33
F JUMLAH HARGA PEKERJAAN (D+E) 330,696.58
G PEMBULATAN 330,700.00

JENIS PEKERJAAN : Paving Block Warna 8cm


SATUAN : 1 m2
KODE : H.9.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.2500 114,300.00 28,575.00
Tukang Batu L.02 OH 0.5000 123,300.00 61,650.00
Kepala tukang L.03 OH 0.0250 141,300.00 3,532.50
Mandor L.04 OH 0.0025 150,300.00 375.75
Jumlah Tenaga 94,133.25
B BAHAN
Paving Blok Warna 8cm m2 1.1000 200,000.00 220,000.00
Pasir Urug m3 0.0500 200,000.00 10,000.00
Abu Batu m3 0.0500 300,000.00 15,000.00
Jumlah Bahan 245,000.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 339,133.25
E OVERHEAD & PROFIT 10% x D 33,913.33
F JUMLAH HARGA PEKERJAAN (D+E) 373,046.58
G PEMBULATAN 373,100.00

JENIS PEKERJAAN : Paving Block Natural 6cm


SATUAN : 1 m2
KODE : H.10.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.2500 114,300.00 28,575.00
Tukang Batu L.02 OH 0.5000 123,300.00 61,650.00
Kepala tukang L.03 OH 0.0250 141,300.00 3,532.50
Mandor L.04 OH 0.0025 150,300.00 375.75
Jumlah Tenaga 94,133.25
B BAHAN
Paving Blok Natural 6cm m2 1.1000 140,000.00 154,000.00
Pasir Urug M3 0.0500 200,000.00 10,000.00
Abu Batu m3 0.0500 300,000.00 15,000.00
Jumlah Bahan 179,000.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 273,133.25
E OVERHEAD & PROFIT 10% x D 27,313.33
F JUMLAH HARGA PEKERJAAN (D+E) 300,446.58
G PEMBULATAN 300,500.00

JENIS PEKERJAAN : Paving Block Warna 6cm


SATUAN : 1 m2
KODE : H.11.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.2500 114,300.00 28,575.00
Tukang Batu L.02 OH 0.5000 123,300.00 61,650.00
Kepala tukang L.03 OH 0.0250 141,300.00 3,532.50
Mandor L.04 OH 0.0025 150,300.00 375.75
Jumlah Tenaga 94,133.25
B BAHAN
Paving Blok Warna 6cm m2 1.1000 175,000.00 192,500.00
Pasir Urug m3 0.0500 200,000.00 10,000.00
Abu Batu m3 0.0500 300,000.00 15,000.00
Jumlah Bahan 217,500.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 311,633.25
E OVERHEAD & PROFIT 10% x D 31,163.33
F JUMLAH HARGA PEKERJAAN (D+E) 342,796.58
G PEMBULATAN 342,800.00

JENIS PEKERJAAN : Pemasangan Paving Block Existing


SATUAN : 1 m2
KODE : H.11.Hit-a

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.2500 114,300.00 28,575.00
Tukang Batu L.02 OH 0.5000 123,300.00 61,650.00
Kepala tukang L.03 OH 0.0250 141,300.00 3,532.50
Mandor L.04 OH 0.0025 150,300.00 375.75
Jumlah Tenaga 94,133.25
B BAHAN
-
-
-
Jumlah Bahan -
C PERALATAN
Jumlah Alat
D JUMLAH (A+B+C) 94,133.25
E OVERHEAD & PROFIT 10% x D 9,413.33
F JUMLAH HARGA PEKERJAAN (D+E) 103,546.58
G PEMBULATAN 103,600.00
I. HARGA SATUAN PEKERJAAN PLAFOND

JENIS PEKERJAAN : Plafond Gypsum (Bahan dan Merk Sesuai RKS)+ Rangka Kayu
SATUAN : 1 m2
KODE : I.1.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.2700 114,300.00 30,861.00
Tukang L.02 OH 0.4000 123,300.00 49,320.00
Kepala tukang L.03 OH 0.0400 141,300.00 5,652.00
Mandor L.04 OH 0.0135 150,300.00 2,029.05
Jumlah Tenaga 87,862.05
B BAHAN
Gypsum Board 120 x 240 x 9 mm Lembar 0.3900 75,000.00 29,250.00
Screw Gypsum kg 0.1100 75,000.00 8,250.00
Kayu Balok Kelas II m3 0.0230 2,500,000.00 57,500.00
Paku 1 - 3 cm kg 0.0600 20,000.00 1,200.00
Jumlah Bahan 96,200.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 184,062.05
E OVERHEAD & PROFIT 10% x D 18,406.21
F JUMLAH HARGA PEKERJAAN (D+E) 202,468.26
G PEMBULATAN 202,500.00

JENIS PEKERJAAN : Plafond Gypsum (Bahan dan Merk Sesuai RKS) + Rangka Hollow
SATUAN : 1 m2
KODE : I.2.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.1000 114,300.00 11,430.00
Tukang L.02 OH 0.0500 123,300.00 6,165.00
Kepala tukang L.03 OH 0.0050 141,300.00 706.50
Mandor L.04 OH 0.0050 150,300.00 751.50
Jumlah Tenaga 19,053.00
B BAHAN
Besi Hollow 20x40 btg 0.1500 18,000.00 2,700.00
Besi Hollow 40x40 btg 0.4150 22,000.00 9,130.00
Gypsum Board 120 x 240 x 9 mm Lbr 0.3640 75,000.00 27,300.00
Screw Gypsum Kg 0.1100 75,000.00 8,250.00
Ramset / Dinabolt buah 4.0000 5,000.00 20,000.00
Cotton Plester buah 0.0720 24,000.00 1,728.00
Coumpound Zak 0.1250 88,000.00 11,000.00
Jumlah Bahan 80,108.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 99,161.00
E OVERHEAD & PROFIT 10% x D 9,916.10
F JUMLAH HARGA PEKERJAAN (D+E) 109,077.10
G PEMBULATAN 109,100.00

JENIS PEKERJAAN : Plafond GRC tebal 4mm (Bahan dan Merk Sesuai RKS) + Rangka Kayu
SATUAN : 1 m2
KODE : I.3.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.2700 114,300.00 30,861.00
Tukang L.02 OH 0.4000 123,300.00 49,320.00
Kepala tukang L.03 OH 0.0400 141,300.00 5,652.00
Mandor L.04 OH 0.0135 150,300.00 2,029.05
Jumlah Tenaga 87,862.05
B BAHAN
Kayu Balok Kelas II m3 0.0230 2,500,000.00 57,500.00
Paku 4 - 7 cm Kg 0.0600 17,000.00 1,020.00
GRC Lbr 0.3900 72,000.00 28,080.00
Screw GRC Kg 0.1100 75,000.00 8,250.00
Cotton Plester buah 0.0720 24,000.00 1,728.00
Coumpound Zak 0.1250 88,000.00 11,000.00
Jumlah Bahan 107,578.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 195,440.05
E OVERHEAD & PROFIT 10% x D 19,544.01
F JUMLAH HARGA PEKERJAAN (D+E) 214,984.06
G PEMBULATAN 215,000.00

JENIS PEKERJAAN : Plafond GRC tebal 4mm (Bahan dan Merk Sesuai RKS) + Rangka Hollow
SATUAN : 1 m2
KODE : I.4.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.1000 114,300.00 11,430.00
Tukang L.02 OH 0.0500 123,300.00 6,165.00
Kepala tukang L.03 OH 0.0050 141,300.00 706.50
Mandor L.04 OH 0.0050 150,300.00 751.50
Jumlah Tenaga 19,053.00
B BAHAN
Besi Hollow 20x40 btg 0.1500 18,000.00 2,700.00
Besi Hollow 40x40 btg 0.4150 22,000.00 9,130.00
GRC Lbr 0.3640 72,000.00 26,208.00
Screw GRC Kg 0.1100 75,000.00 8,250.00
Ramset / Dinabolt buah 4.0000 5,000.00 20,000.00
Cotton Plester buah 0.0720 24,000.00 1,728.00
Coumpound Zak 0.1250 88,000.00 11,000.00
Jumlah Bahan 79,016.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 98,069.00
E OVERHEAD & PROFIT 10% x D 9,806.90
F JUMLAH HARGA PEKERJAAN (D+E) 107,875.90
G PEMBULATAN 107,900.00

JENIS PEKERJAAN : Plafond PVC tebal 9mm + List (Bahan dan Merk Sesuai RKS)
SATUAN : 1 m2
KODE : I.5.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.0600 114,300.00 6,858.00
Tukang L.02 OH 0.0450 123,300.00 5,548.50
Jumlah Tenaga 12,406.50
B BAHAN
Plafond PVC tb. 9mm M1 6.2500 29,000.00 181,250.00
List Sudut Plafond PVC M1 1.0000 20,750.00 20,750.00
Assesories (List Sambungan, Sekrup dll) % 0.1000 202,000.00 20,200.00
Jumlah Bahan 222,200.00
C PERALATAN
Jumlah Alat
D JUMLAH (A+B+C) 234,606.50
E OVERHEAD & PROFIT 10% x D 23,460.65
F JUMLAH HARGA PEKERJAAN (D+E) 258,067.15
G PEMBULATAN 258,100.00

JENIS PEKERJAAN : Rangka Plafond Hollow Galvalume 20x40 + 40x40


SATUAN : 1 m2
KODE : I.6.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.1400 114,300.00 16,002.00
Tukang L.02 OH 0.1050 123,300.00 12,946.50
Jumlah Tenaga 28,948.50
B BAHAN
Besi Hollow 20x40 btg 0.3500 18,000.00 6,300.00
Besi Hollow 40x40 btg 0.7000 22,000.00 15,400.00
Assesories (Perkuatan, Sekrup dll) % 0.3000 21,700.00 6,510.00
Jumlah Bahan 28,210.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 57,158.50
E OVERHEAD & PROFIT 10% x D 5,715.85
F JUMLAH HARGA PEKERJAAN (D+E) 62,874.35
G PEMBULATAN 62,900.00

JENIS PEKERJAAN : List Plafond Kayu 1x4 cm


SATUAN : 1 m1
KODE : I.7.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.0500 114,300.00 5,715.00
Tukang L.02 OH 0.0500 123,300.00 6,165.00
Kepala tukang L.03 OH 0.0050 141,300.00 706.50
Mandor L.04 OH 0.0030 150,300.00 450.90
Jumlah Tenaga 13,037.40
B BAHAN
List kayu 1/4 cm m 1.0500 5,000.00 5,250.00
Paku 1 - 3 cm kg 0.0100 20,000.00 200.00
Jumlah Bahan 5,450.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 18,487.40
E OVERHEAD & PROFIT 10% x D 1,848.74
F JUMLAH HARGA PEKERJAAN (D+E) 20,336.14
G PEMBULATAN 20,400.00

JENIS PEKERJAAN : List Plafond Kayu profil 4 cm


SATUAN : 1 m1
KODE : I.8.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.0500 114,300.00 5,715.00
Tukang L.02 OH 0.0500 123,300.00 6,165.00
Kepala tukang L.03 OH 0.0050 141,300.00 706.50
Mandor L.04 OH 0.0030 150,300.00 450.90
Jumlah Tenaga 13,037.40
B BAHAN
List kayu profil 4 cm m 1.0500 25,000.00 26,250.00
Paku 4 - 7 cm kg 0.0100 17,000.00 170.00
Jumlah Bahan 26,420.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 39,457.40
E OVERHEAD & PROFIT 10% x D 3,945.74
F JUMLAH HARGA PEKERJAAN (D+E) 43,403.14
G PEMBULATAN 43,500.00

JENIS PEKERJAAN : List Plafond Gypsum


SATUAN : 1 m1
KODE : I.9.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.0500 114,300.00 5,715.00
Tukang L.02 OH 0.0500 123,300.00 6,165.00
Kepala tukang L.03 OH 0.0050 141,300.00 706.50
Mandor L.04 OH 0.0030 150,300.00 450.90
Jumlah Tenaga 13,037.40
B BAHAN
List Gypsum m 1.0500 15,000.00 15,750.00
Tepung Gypsum kg 0.0100 12,000.00 120.00
Jumlah Bahan 15,870.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 28,907.40
E OVERHEAD & PROFIT 10% x D 2,890.74
F JUMLAH HARGA PEKERJAAN (D+E) 31,798.14
G PEMBULATAN 31,800.00

JENIS PEKERJAAN : Listplank GRC tebal 9mm Tumpangsari


SATUAN : 1 m1
KODE : I.10.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.1100 114,300.00 12,573.00
Tukang L.02 OH 0.2200 123,300.00 27,126.00
Kepala tukang L.03 OH 0.0220 141,300.00 3,108.60
Mandor L.04 OH 0.0050 150,300.00 751.50
Jumlah Tenaga 43,559.10
B BAHAN
Listplank GRC m1 0.4200 70,000.00 29,400.00
Kayu Balok Kelas III m3 0.0030 2,100,000.00 6,300.00
Paku 4 - 7 cm Kg 0.3000 17,000.00 5,100.00
Jumlah Bahan 40,800.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 84,359.10
E OVERHEAD & PROFIT 10% x D 8,435.91
F JUMLAH HARGA PEKERJAAN (D+E) 92,795.01
G PEMBULATAN 92,800.00

JENIS PEKERJAAN : Listplank Capit Gunting GRC tebal 9 mm


SATUAN : 1 m1
KODE : I.11.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.1100 114,300.00 12,573.00
Tukang L.02 OH 0.2200 123,300.00 27,126.00
Kepala tukang L.03 OH 0.0220 141,300.00 3,108.60
Mandor L.04 OH 0.0050 150,300.00 751.50
Jumlah Tenaga 43,559.10
B BAHAN
Listplank GRC m1 0.4200 70,000.00 29,400.00
Kayu Balok Kelas III m3 0.0030 2,100,000.00 6,300.00
Paku 4 - 7 cm Kg 0.3000 17,000.00 5,100.00
Jumlah Bahan 40,800.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 84,359.10
E OVERHEAD & PROFIT 10% x D 8,435.91
F JUMLAH HARGA PEKERJAAN (D+E) 92,795.01
G PEMBULATAN 92,800.00
J. HARGA SATUAN PEKERJAAN PENUTUP ATAP

JENIS PEKERJAAN : Atap Palentong


SATUAN : 1 m2
KODE : J.1.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA
Pekerja L.01 OH 0.1500 114,300.00 17,145.00
Tukang Kayu L.03 OH 0.0750 123,300.00 9,247.50
Kepala tukang L.11 OH 0.0075 141,300.00 1,059.75
Mandor L.15 OH 0.0080 150,300.00 1,202.40
Jumlah Tenaga 28,654.65
B BAHAN
Genteng palentong Bh 25.0000 3,000.00 75,000.00
Jumlah Bahan 75,000.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 103,654.65
E OVERHEAD & PROFIT 10% x D 10,365.47
F JUMLAH HARGA PEKERJAAN (D+E) 114,020.12
G PEMBULATAN 114,100.00

JENIS PEKERJAAN : Atap Morando Natural


SATUAN : 1 m2
KODE : J.2.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA
Pekerja L.01 OH 0.1500 114,300.00 17,145.00
Tukang Kayu L.03 OH 0.0750 123,300.00 9,247.50
Kepala tukang L.11 OH 0.0080 141,300.00 1,130.40
Mandor L.15 OH 0.0080 150,300.00 1,202.40
Jumlah Tenaga 28,725.30
B BAHAN
Genteng Murando Natural Bh 18.0000 5,000.00 90,000.00
Jumlah Bahan 90,000.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 118,725.30
E OVERHEAD & PROFIT 10% x D 11,872.53
F JUMLAH HARGA PEKERJAAN (D+E) 130,597.83
G PEMBULATAN 130,600.00

JENIS PEKERJAAN : Atap Morando Glazur


SATUAN : 1 m2
KODE : J.3.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA
Pekerja L.01 OH 0.1500 114,300.00 17,145.00
Tukang Kayu L.03 OH 0.0750 123,300.00 9,247.50
Kepala tukang L.11 OH 0.0080 141,300.00 1,130.40
Mandor L.15 OH 0.0080 150,300.00 1,202.40
Jumlah Tenaga 28,725.30
B BAHAN
Genteng Murando Glazur Bh 18.0000 6,000.00 108,000.00
Jumlah Bahan 108,000.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 136,725.30
E OVERHEAD & PROFIT 10% x D 13,672.53
F JUMLAH HARGA PEKERJAAN (D+E) 150,397.83
G PEMBULATAN 150,400.00

JENIS PEKERJAAN : Atap Metal Roof Berpasir (Bahan dan Merk Sesuai RKS)
SATUAN : 1 m2
KODE : J.4.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA
Pekerja L.01 OH 0.2000 114,300.00 22,860.00
Tukang Kayu L.03 OH 0.1000 123,300.00 12,330.00
Kepala tukang L.11 OH 0.0100 141,300.00 1,413.00
Mandor L.15 OH 0.0010 150,300.00 150.30
Jumlah Tenaga 36,753.30
B BAHAN
Genteng metal Berpasir lembar 1.3000 65,000.00 84,500.00
Sekrup 1 - 3 cm Kg 0.0250 75,000.00 1,875.00
Jumlah Bahan 86,375.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 123,128.30
E OVERHEAD & PROFIT 10% x D 12,312.83
F JUMLAH HARGA PEKERJAAN (D+E) 135,441.13
G PEMBULATAN 135,500.00

JENIS PEKERJAAN : Atap Bitumen Selulosa Shaded Red (Bahan dan Merk Sesuai RKS)
SATUAN : 1 m2
KODE : J.5.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA
Pekerja L.01 OH 0.2000 114,300.00 22,860.00
Tukang L.03 OH 0.1000 123,300.00 12,330.00
Jumlah Tenaga 35,190.00
B BAHAN
Genteng Bitumen Lembar 3.2380 56,500.00 182,947.00
Screw Atap Bitumen bh 16.1900 1,200.00 19,428.00
Jumlah Bahan 202,375.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 237,565.00
E OVERHEAD & PROFIT 10% x D 23,756.50
F JUMLAH HARGA PEKERJAAN (D+E) 261,321.50
G PEMBULATAN 261,400.00

JENIS PEKERJAAN : Atap Bitumen Bergelombang Memanjang Shaded Red (Bahan dan Merk Sesuai RKS)
SATUAN : 1 m2
KODE : J.5.Hit-a

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA
Pekerja L.01 OH 0.1400 114,300.00 16,002.00
Tukang L.03 OH 0.0700 123,300.00 8,631.00
Jumlah Tenaga 24,633.00
B BAHAN
Genteng Bitumen Memanjang Lembar 0.7230 155,000.00 112,065.00
Screw Atap Bitumen bh 11.7650 1,200.00 14,118.00
Jumlah Bahan 126,183.00
C PERALATAN
Jumlah Alat
D JUMLAH (A+B+C) 150,816.00
E OVERHEAD & PROFIT 10% x D 15,081.60
F JUMLAH HARGA PEKERJAAN (D+E) 165,897.60
G PEMBULATAN 165,900.00

JENIS PEKERJAAN : Atap U-PVC tebal 12mm Merah Maroon (Bahan dan Merk Sesuai RKS)
SATUAN : 1 m2
KODE : J.6.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA
Pekerja L.01 OH 0.2000 114,300.00 22,860.00
Tukang L.03 OH 0.1000 123,300.00 12,330.00
Jumlah Tenaga 35,190.00
B BAHAN
Genteng U-PVC m2 m2 1.0000 180,000.00 180,000.00
Screw Atap U-PVC bh 10.0000 2,500.00 25,000.00
Jumlah Bahan 205,000.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 240,190.00
E OVERHEAD & PROFIT 10% x D 24,019.00
F JUMLAH HARGA PEKERJAAN (D+E) 264,209.00
G PEMBULATAN 264,300.00

JENIS PEKERJAAN : Nok Palentong


SATUAN : 1 m1
KODE : J.7.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA
Pekerja L.01 OH 0.4000 114,300.00 45,720.00
Tukang Kayu L.03 OH 0.2000 123,300.00 24,660.00
Kepala tukang L.11 OH 0.0200 141,300.00 2,826.00
Mandor L.15 OH 0.0020 150,300.00 300.60
Jumlah Tenaga 73,506.60
B BAHAN
Bubungan genteng palentong Bh 5.0000 10,000.00 50,000.00
Semen Portland Kg 8.0000 1,300.00 10,400.00
Pasir pasang M3 0.0320 300,000.00 9,600.00
Jumlah Bahan 70,000.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 143,506.60
E OVERHEAD & PROFIT 10% x D 14,350.66
F JUMLAH HARGA PEKERJAAN (D+E) 157,857.26
G PEMBULATAN 157,900.00

JENIS PEKERJAAN : Nok Morando Natural


SATUAN : 1 m1
KODE : J.8.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA
Pekerja L.01 OH 0.1500 114,300.00 17,145.00
Tukang Kayu L.03 OH 0.0750 123,300.00 9,247.50
Kepala tukang L.11 OH 0.0080 141,300.00 1,130.40
Mandor L.15 OH 0.0080 150,300.00 1,202.40
Jumlah Tenaga 28,725.30
B BAHAN
Bubungan Murando Natural Bh 5.0000 12,000.00 60,000.00
Semen Portland Kg 8.0000 1,300.00 10,400.00
Pasir pasang M3 0.0320 300,000.00 9,600.00
Jumlah Bahan 80,000.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 108,725.30
E OVERHEAD & PROFIT 10% x D 10,872.53
F JUMLAH HARGA PEKERJAAN (D+E) 119,597.83
G PEMBULATAN 119,600.00

JENIS PEKERJAAN : Nok Morando Glazur


SATUAN : 1 m1
KODE : J.9.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA
Pekerja L.01 OH 0.1500 114,300.00 17,145.00
Tukang Kayu L.03 OH 0.0750 123,300.00 9,247.50
Kepala tukang L.11 OH 0.0080 141,300.00 1,130.40
Mandor L.15 OH 0.0080 150,300.00 1,202.40
Jumlah Tenaga 28,725.30
B BAHAN
Bubungan Murando Glazur Bh 5.0000 12,000.00 60,000.00
Semen Portland Kg 8.0000 1,300.00 10,400.00
Pasir pasang M3 0.0320 300,000.00 9,600.00
Jumlah Bahan 80,000.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 108,725.30
E OVERHEAD & PROFIT 10% x D 10,872.53
F JUMLAH HARGA PEKERJAAN (D+E) 119,597.83
G PEMBULATAN 119,600.00

JENIS PEKERJAAN : Nok Metal Roof Berpasir (Bahan dan Merk Sesuai RKS)
SATUAN : 1 m1
KODE : J.10.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA
Pekerja L.01 OH 0.2500 114,300.00 28,575.00
Tukang Kayu L.03 OH 0.1500 123,300.00 18,495.00
Kepala tukang L.11 OH 0.0150 141,300.00 2,119.50
Mandor L.15 OH 0.0130 150,300.00 1,953.90
Jumlah Tenaga 51,143.40
B BAHAN
Genteng Nok Metal Berpasir Bh 1.0000 34,000.00 34,000.00
Sekrup 1 - 3 cm Kg 0.0500 75,000.00 3,750.00
Jumlah Bahan 37,750.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 88,893.40
E OVERHEAD & PROFIT 10% x D 8,889.34
F JUMLAH HARGA PEKERJAAN (D+E) 97,782.74
G PEMBULATAN 97,800.00

JENIS PEKERJAAN : Nok Bitumen Selulosa Shaded Red (Bahan dan Merk Sesuai RKS)
SATUAN : 1 m2
KODE : J.11.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA
Pekerja L.01 OH 0.0840 114,300.00 9,601.20
Tukang L.03 OH 0.1250 123,300.00 15,412.50
Jumlah Tenaga 25,013.70
B BAHAN
Genteng Nok Bitumen Lembar 1.2500 95,000.00 118,750.00
Screw Atap Bitumen bh 10.0000 1,200.00 12,000.00
Jumlah Bahan 130,750.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 155,763.70
E OVERHEAD & PROFIT 10% x D 15,576.37
F JUMLAH HARGA PEKERJAAN (D+E) 171,340.07
G PEMBULATAN 171,400.00

JENIS PEKERJAAN : Nok U-PVC tebal 12mm Merah Maroon (Bahan dan Merk Sesuai RKS)
SATUAN : 1 m2
KODE : J.12.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA
Pekerja L.01 OH 0.0840 114,300.00 9,601.20
Tukang L.03 OH 0.1250 123,300.00 15,412.50
Jumlah Tenaga 25,013.70
B BAHAN
Nok U-PVC Lembar 1.0000 99,000.00 99,000.00
Screw Atap U-PVC bh 6.0000 2,500.00 15,000.00
Jumlah Bahan 114,000.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 139,013.70
E OVERHEAD & PROFIT 10% x D 13,901.37
F JUMLAH HARGA PEKERJAAN (D+E) 152,915.07
G PEMBULATAN 153,000.00

JENIS PEKERJAAN : Nok Tepi Morando


SATUAN : 1 m1
KODE : J.13.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA
Pekerja L.01 OH 0.2500 114,300.00 28,575.00
Tukang Kayu L.03 OH 0.1500 123,300.00 18,495.00
Kepala tukang L.11 OH 0.0150 141,300.00 2,119.50
Mandor L.15 OH 0.0130 150,300.00 1,953.90
Jumlah Tenaga 51,143.40
B BAHAN
Genteng Nok Pinggir Morando Bh 5.0000 10,000.00 50,000.00
Paku 8 - 15 cm Kg 0.0500 17,000.00 850.00
Jumlah Bahan 50,850.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 101,993.40
E OVERHEAD & PROFIT 10% x D 10,199.34
F JUMLAH HARGA PEKERJAAN (D+E) 112,192.74
G PEMBULATAN 112,200.00

JENIS PEKERJAAN : Nok Tepi Bitumen Selulosa Shaded Red (Bahan dan Merk Sesuai RKS)
SATUAN : 1 m2
KODE : J.14.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA
Pekerja L.01 OH 0.0840 114,300.00 9,601.20
Tukang L.03 OH 0.1250 123,300.00 15,412.50
Jumlah Tenaga 25,013.70
B BAHAN
Genteng Nok Bitumen Lembar 1.0420 95,000.00 98,990.00
Screw Atap Bitumen bh 8.3360 1,200.00 10,003.20
Jumlah Bahan 108,993.20
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 134,006.90
E OVERHEAD & PROFIT 10% x D 13,400.69
F JUMLAH HARGA PEKERJAAN (D+E) 147,407.59
G PEMBULATAN 147,500.00

JENIS PEKERJAAN : Kuda-Kuda Baja Ringan (Lolos Verifikasi PUPR sesuai RKS)
SATUAN : 1 m2
KODE : J.15.
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.2000 114,300.00 22,860.00
Tukang L.03 OH 0.1000 123,300.00 12,330.00
Jumlah Tenaga 35,190.00
B BAHAN
Baja Ringan (Main Truss C 75 tb. 0,75 mm) m1 2.8000 12,500.00 35,000.00
Reng R-35 tb. 0,45 mm m1 5.1000 5,800.00 29,580.00
Sekrup Baja Ringan bh 20.0000 1,500.00 30,000.00
Sekrup Reng bh 10.0000 1,200.00 12,000.00
Dinabolt bh 1.0000 5,000.00 5,000.00
Jumlah Bahan 111,580.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 146,770.00
E OVERHEAD & PROFIT 10% x D 14,677.00
F JUMLAH HARGA PEKERJAAN (D+E) 161,447.00
G PEMBULATAN 161,500.00

JENIS PEKERJAAN : Pemasangan Reng Baja Ringan


SATUAN : 1 m2
KODE : J.16.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA
Pekerja L.01 OH 0.1000 114,300.00 11,430.00
Tukang L.03 OH 0.0500 123,300.00 6,165.00
Jumlah Tenaga 17,595.00
B BAHAN
Reng R-35 tb. 0,45 mm m1 5.1000 5,800.00 29,580.00
Sekrup Reng bh 10.0000 1,200.00 12,000.00
Jumlah Bahan 41,580.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 59,175.00
E OVERHEAD & PROFIT 10% x D 5,917.50
F JUMLAH HARGA PEKERJAAN (D+E) 65,092.50
G PEMBULATAN 65,100.00
K. HARGA SATUAN PEKERJAAN KAYU

JENIS PEKERJAAN : Daun Pintu Panel Multyplek tb 9mm, Rangka kayu kelas II
SATUAN : 1 m2
KODE : K.1.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA
Pekerja L.01 OH 0.6000 114,300.00 68,580.00
Tukang kayu L.03 OH 2.0000 123,300.00 246,600.00
Kepala tukang L.03 OH 0.2000 141,300.00 28,260.00
Mandor L.04 OH 0.0500 150,300.00 7,515.00
Jumlah Tenaga 350,955.00
B BAHAN
Kayu papan kelas II m3 0.0230 2,500,000.00 57,500.00
Paku 1 - 3 cm kg 0.3000 20,000.00 6,000.00
Lem kayu kg 0.1500 25,000.00 3,750.00
Multiplek 9 mm Lembar 0.2300 150,000.00 34,500.00
Jumlah Bahan 101,750.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 452,705.00
E OVERHEAD & PROFIT 10% x D 45,270.50
F JUMLAH HARGA PEKERJAAN (D+E) 497,975.50
G PEMBULATAN 498,000.00

JENIS PEKERJAAN : Daun Pintu Panel Multyplek 9mm, Rangka Alumunium


SATUAN : 1 Unit
KODE : K.2.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA
Pekerja L.01 OH 0.7500 114,300.00 85,725.00
Tukang Alumunium L.03 OH 0.3125 123,300.00 38,531.25
Kepala tukang L.03 OH 0.0313 141,300.00 4,422.69
Mandor L.04 OH 0.0750 150,300.00 11,272.50
Jumlah Tenaga 139,951.44
B BAHAN
Profil Alumunium Natural 8 cm m1 7.4000 60,000.00 444,000.00
Multiplek 9 mm Lembar 0.6000 150,000.00 90,000.00
Asesories 5% % 1.0000 26,700.00 26,700.00
Jumlah Bahan 560,700.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 700,651.44
E OVERHEAD & PROFIT 10% x D 70,065.14
F JUMLAH HARGA PEKERJAAN (D+E) 770,716.58
G PEMBULATAN 770,800.00

JENIS PEKERJAAN : Daun Pintu Panel Spandrel Alumunium, Rangka Alumunium


SATUAN : 1 Unit
KODE : K.3.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA
Pekerja L.01 OH 0.7500 114,300.00 85,725.00
Tukang Alumunium L.03 OH 0.3125 123,300.00 38,531.25
Kepala tukang L.03 OH 0.0313 141,300.00 4,422.69
Mandor L.04 OH 0.0750 150,300.00 11,272.50
Jumlah Tenaga 139,951.44
B BAHAN
Profil Alumunium Natural 8 cm m1 7.4000 60,000.00 444,000.00
Spandrel Alumunium batang 3.0000 175,000.00 525,000.00
Asesories 5% kg 1.0000 48,450.00 48,450.00
Jumlah Bahan 1,017,450.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 1,157,401.44
E OVERHEAD & PROFIT 10% x D 115,740.14
F JUMLAH HARGA PEKERJAAN (D+E) 1,273,141.58
G PEMBULATAN 1,273,200.00

JENIS PEKERJAAN : Daun Pintu Panel Multyplek 9mm Lapis HPL, Rangka Alumunium
SATUAN : 1 Unit
KODE : K.4.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA
Pekerja L.01 OH 0.7500 114,300.00 85,725.00
Tukang Alumunium L.03 OH 0.3125 123,300.00 38,531.25
Kepala tukang L.03 OH 0.0313 141,300.00 4,422.69
Mandor L.04 OH 0.0750 150,300.00 11,272.50
Jumlah Tenaga 139,951.44
B BAHAN
Profil Alumunium Natural 8 cm m1 7.4000 60,000.00 444,000.00
Multiplek 9 mm Lembar 0.6000 150,000.00 90,000.00
HPL (High Preassure Laminate) Lembar 0.8200 200,000.00 164,000.00
Asesories 5% kg 1.0000 26,700.00 26,700.00
Jumlah Bahan 724,700.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 864,651.44
E OVERHEAD & PROFIT 10% x D 86,465.14
F JUMLAH HARGA PEKERJAAN (D+E) 951,116.58
G PEMBULATAN 951,200.00

JENIS PEKERJAAN : Rangka Plafond (60 x 60), Kayu Kelas II


SATUAN : 1 m2
KODE : K.5.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA
Pekerja L.01 OH 0.2000 114,300.00 22,860.00
Tukang kayu L.03 OH 0.3000 123,300.00 36,990.00
Kepala tukang L.03 OH 0.0300 141,300.00 4,239.00
Mandor L.04 OH 0.0100 150,300.00 1,503.00
Jumlah Tenaga 65,592.00
B BAHAN
Kayu Balok Kelas II m3 0.0163 2,500,000.00 40,750.00
Paku 8 - 15 cm kg 0.2500 17,000.00 4,250.00
Jumlah Bahan 45,000.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 110,592.00
E OVERHEAD & PROFIT 10% x D 11,059.20
F JUMLAH HARGA PEKERJAAN (D+E) 121,651.20
G PEMBULATAN 121,700.00
L. HARGA SATUAN PEKERJAAN PENGECATAN

JENIS PEKERJAAN : Pengerokan Cat Lama


SATUAN : 1 m2
KODE : L.1.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA
Pekerja L.01 OH 0.1500 114,300.00 17,145.00
Mandor L.04 OH 0.0030 150,300.00 450.90
Jumlah Tenaga 17,595.90
B BAHAN
Soda api Kg 0.0500 27,000.00 1,350.00
Jumlah Bahan 1,350.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 18,945.90
E OVERHEAD & PROFIT 10 % x D 1,894.59
F JUMLAH HARGA PEKERJAAN (D+E) 20,840.49
G PEMBULATAN 20,900.00

JENIS PEKERJAAN : Pengecatan Kayu 2x (Bahan dan Merk Sesuai RKS)


SATUAN : 1 m2
KODE : L.2.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA
Pekerja L.01 OH 0.0700 114,300.00 8,001.00
Tukang L.02 OH 0.0090 123,300.00 1,109.70
Kepala Tukang L.03 OH 0.0060 141,300.00 847.80
Mandor L.04 OH 0.0030 150,300.00 450.90
Jumlah Tenaga 10,409.40
B BAHAN
Meni besi/kayu Kg 0.2000 30,000.00 6,000.00
Cat Kayu Kg 0.2600 75,000.00 19,500.00
Kuas Bh 0.0100 20,500.00 205.00
Minyak cat / Afdunner Kg 0.0300 11,000.00 330.00
Ampelas Lbr 0.2000 6,500.00 1,300.00
Jumlah Bahan 27,335.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 37,744.40
E OVERHEAD & PROFIT 10 % x D 3,774.44
F JUMLAH HARGA PEKERJAAN (D+E) 41,518.84
G PEMBULATAN 41,600.00

JENIS PEKERJAAN : Pengecatan Kayu 3x (Bahan dan Merk Sesuai RKS)


SATUAN : 1 m2
KODE : L.3.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA
Pekerja L.01 OH 0.0700 114,300.00 8,001.00
Tukang L.02 OH 0.1050 123,300.00 12,946.50
Kepala Tukang L.03 OH 0.0040 141,300.00 565.20
Mandor L.04 OH 0.0030 150,300.00 450.90
Jumlah Tenaga 21,963.60
B BAHAN
Meni besi/kayu Kg 0.2000 30,000.00 6,000.00
Cat Kayu Kg 0.3500 75,000.00 26,250.00
Kuas Bh 0.0100 20,500.00 205.00
Minyak cat / Afdunner Kg 0.0300 11,000.00 330.00
Ampelas Lbr 0.2000 6,500.00 1,300.00
Jumlah Bahan 34,085.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 56,048.60
E OVERHEAD & PROFIT 10 % x D 5,604.86
F JUMLAH HARGA PEKERJAAN (D+E) 61,653.46
G PEMBULATAN 61,700.00

JENIS PEKERJAAN : Pengecatan Dinding Interior 2x (Bahan dan Merk Sesuai RKS)
SATUAN : 1 m2
KODE : L.4.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA
Pekerja L.01 OH 0.0200 114,300.00 2,286.00
Tukang L.02 OH 0.0630 123,300.00 7,767.90
Kepala Tukang L.03 OH 0.0063 141,300.00 890.19
Mandor L.04 OH 0.0030 150,300.00 450.90
Jumlah Tenaga 11,394.99
B BAHAN
Plamir Kg 0.1000 25,000.00 2,500.00
Cat Dasar Kg 0.1000 25,000.00 2,500.00
Cat Tembok Interior Kg 0.2600 31,000.00 8,060.00
Ampelas Lbr 0.2000 6,500.00 1,300.00
Kuas Bh 0.0100 20,500.00 205.00
Rol Cat Bh 0.0100 35,000.00 350.00
Jumlah Bahan 14,915.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 26,309.99
E OVERHEAD & PROFIT 10 % x D 2,631.00
F JUMLAH HARGA PEKERJAAN (D+E) 28,940.99
G PEMBULATAN 29,000.00

JENIS PEKERJAAN : Pengecatan Dinding Interior 3x (Bahan dan Merk Sesuai RKS)
SATUAN : 1 m2
KODE : L.5.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA
Pekerja L.01 OH 0.0300 114,300.00 3,429.00
Tukang L.02 OH 0.0945 123,300.00 11,651.85
Kepala Tukang L.03 OH 0.0095 141,300.00 1,342.35
Mandor L.04 OH 0.0038 150,300.00 571.14
Jumlah Tenaga 16,994.34
B BAHAN
Plamir Kg 0.1000 25,000.00 2,500.00
Cat Dasar Kg 0.1000 25,000.00 2,500.00
Cat Tembok Interior Kg 0.3900 31,000.00 12,090.00
Ampelas Lbr 0.2000 6,500.00 1,300.00
Kuas Bh 0.0100 20,500.00 205.00
Rol Cat Bh 0.0100 35,000.00 350.00
Jumlah Bahan 18,945.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 35,939.34
E OVERHEAD & PROFIT 10 % x D 3,593.93
F JUMLAH HARGA PEKERJAAN (D+E) 39,533.27
G PEMBULATAN 39,600.00

JENIS PEKERJAAN : Pengecatan Dinding Exterior 2x (Bahan dan Merk Sesuai RKS)
SATUAN : 1 m2
KODE : L.6.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA
Pekerja L.01 OH 0.0200 114,300.00 2,286.00
Tukang L.02 OH 0.0630 123,300.00 7,767.90
Kepala Tukang L.03 OH 0.0063 141,300.00 890.19
Mandor L.04 OH 0.0030 150,300.00 450.90
Jumlah Tenaga 11,394.99
B BAHAN
Cat Dasar Kg 0.1000 25,000.00 2,500.00
Cat Tembok Exterior Kg 0.2600 40,000.00 10,400.00
Ampelas Lbr 0.2000 6,500.00 1,300.00
Kuas Bh 0.0100 20,500.00 205.00
Rol Cat Bh 0.0100 35,000.00 350.00
Jumlah Bahan 14,755.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 26,149.99
E OVERHEAD & PROFIT 10 % x D 2,615.00
F JUMLAH HARGA PEKERJAAN (D+E) 28,764.99
G PEMBULATAN 28,800.00

JENIS PEKERJAAN : Pengecatan Dinding Exterior 3x (Bahan dan Merk Sesuai RKS)
SATUAN : 1 m2
KODE : L.7.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA
Pekerja L.01 OH 0.0300 114,300.00 3,429.00
Tukang L.02 OH 0.0945 123,300.00 11,651.85
Kepala Tukang L.03 OH 0.0095 141,300.00 1,342.35
Mandor L.04 OH 0.0038 150,300.00 571.14
Jumlah Tenaga 16,994.34
B BAHAN
Cat Dasar Kg 0.1000 25,000.00 2,500.00
Cat Tembok Exterior Kg 0.3900 40,000.00 15,600.00
Ampelas Lbr 0.2000 6,500.00 1,300.00
Kuas Bh 0.0100 20,500.00 205.00
Rol Cat Bh 0.0100 35,000.00 350.00
Jumlah Bahan 19,955.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 36,949.34
E OVERHEAD & PROFIT 10 % x D 3,694.93
F JUMLAH HARGA PEKERJAAN (D+E) 40,644.27
G PEMBULATAN 40,700.00

JENIS PEKERJAAN : Pengecatan Dinding Lama 2x (Bahan dan Merk Sesuai RKS)
SATUAN : 1 m2
KODE : L.8.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA
Pekerja L.01 OH 0.0280 114,300.00 3,200.40
Tukang L.02 OH 0.0420 123,300.00 5,178.60
Kepala Tukang L.03 OH 0.0042 141,300.00 593.46
Mandor L.04 OH 0.0030 150,300.00 450.90
Jumlah Tenaga 9,423.36
B BAHAN
Cat Dasar Kg 0.1200 25,000.00 3,000.00
Cat Tembok Exterior Kg 0.1800 40,000.00 7,200.00
Ampelas Lbr 0.2000 6,500.00 1,300.00
Kuas Bh 0.0100 20,500.00 205.00
Rol Cat Bh 0.0100 35,000.00 350.00
Jumlah Bahan 12,055.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 21,478.36
E OVERHEAD & PROFIT 10 % x D 2,147.84
F JUMLAH HARGA PEKERJAAN (D+E) 23,626.20
G PEMBULATAN 23,700.00

JENIS PEKERJAAN : Pengecatan Plafond 2x (Bahan dan Merk Sesuai RKS)


SATUAN : 1 m2
KODE : L.9.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA
Pekerja L.01 OH 0.1333 114,300.00 15,236.19
Tukang L.02 OH 0.2000 123,300.00 24,660.00
Kepala Tukang L.03 OH 0.0200 141,300.00 2,826.00
Mandor L.04 OH 0.0067 150,300.00 1,007.01
Jumlah Tenaga 43,729.20
B BAHAN
Plamir Kg 0.1000 25,000.00 2,500.00
Cat Tembok Interior Kg 0.1067 31,000.00 3,307.70
Rol Cat Bh 0.0067 35,000.00 234.50
Alat bantu / steger Ls 0.6667 2,000.00 1,333.40
Jumlah Bahan 7,375.60
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 51,104.80
E OVERHEAD & PROFIT 10 % x D 5,110.48
F JUMLAH HARGA PEKERJAAN (D+E) 56,215.28
G PEMBULATAN 56,300.00

JENIS PEKERJAAN : Pengecatan Plafond 3x (Bahan dan Merk Sesuai RKS)


SATUAN : 1 m2
KODE : L.10.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA
Pekerja L.01 OH 0.2000 114,300.00 22,860.00
Tukang L.02 OH 0.3000 123,300.00 36,990.00
Kepala Tukang L.03 OH 0.0300 141,300.00 4,239.00
Mandor L.04 OH 0.0100 150,300.00 1,503.00
Jumlah Tenaga 65,592.00
B BAHAN
Plamir Kg 0.1600 25,000.00 4,000.00
Cat Tembok Interior Kg 0.1500 31,000.00 4,650.00
Rol Cat Bh 0.0100 35,000.00 350.00
Alat bantu / steger Ls 1.0000 2,000.00 2,000.00
Jumlah Bahan 11,000.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 76,592.00
E OVERHEAD & PROFIT 10 % x D 7,659.20
F JUMLAH HARGA PEKERJAAN (D+E) 84,251.20
G PEMBULATAN 84,300.00

JENIS PEKERJAAN : Pengecatan Vernis


SATUAN : 1 m2
KODE : L.11.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga

A TENAGA
Pekerja L.01 OH 0.1600 114,300.00 18,288.00
Tukang L.02 OH 0.1600 123,300.00 19,728.00
Kepala Tukang L.03 OH 0.0160 141,300.00 2,260.80
Mandor L.04 OH 0.0030 150,300.00 450.90
Jumlah Tenaga 40,727.70
B BAHAN
Vernis liter 0.1500 52,000.00 7,800.00
Ampelas Lbr 0.2000 6,500.00 1,300.00
Kuas Bh 0.0100 20,500.00 205.00
Jumlah Bahan 9,305.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 50,032.70
E OVERHEAD & PROFIT 10 % x D 5,003.27
F JUMLAH HARGA PEKERJAAN (D+E) 55,035.97
G PEMBULATAN 55,100.00
M. HARGA SATUAN PEKERJAAN SANITAIR

JENIS PEKERJAAN : Pemasangan Closet Duduk (Bahan dan Merk Sesuai RKS)
SATUAN : 1 bh
KODE : M.1.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.3300 114,300.00 37,719.00
Tukang L.02 OH 0.1600 123,300.00 19,728.00
Kepala Tukang L.03 OH 0.0110 141,300.00 1,554.30
Mandor L.04 OH 0.0110 150,300.00 1,653.30
Jumlah Tenaga 60,654.60
B BAHAN
Closet duduk Unit 1.0000 1,500,000.00 1,500,000.00
Perlengkapan 6% Ls 1.0000 90,000.00 90,000.00
Jumlah Bahan 1,590,000.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 1,650,654.60
E OVERHEAD & PROFIT 10% x D 165,065.46
F JUMLAH HARGA PEKERJAAN (D+E) 1,815,720.06
G PEMBULATAN 1,815,800.00

JENIS PEKERJAAN : Pemasangan Closet Jongkok (Bahan dan Merk Sesuai RKS)
SATUAN : 1 bh
KODE : M.2.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.1000 114,300.00 11,430.00
Tukang L.02 OH 0.1500 123,300.00 18,495.00
Kepala tukang L.03 OH 0.0150 141,300.00 2,119.50
Mandor L.04 OH 0.0160 150,300.00 2,404.80
Jumlah Tenaga 34,449.30
B BAHAN
Closet Jongkok Poslin Warna Unit 1.0000 350,000.00 350,000.00
Semen Portland Kg 6.0000 1,300.00 7,800.00
Pasir pasang M3 0.0100 300,000.00 3,000.00
Jumlah Bahan 360,800.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 395,249.30
E OVERHEAD & PROFIT 10% x D 39,524.93
F JUMLAH HARGA PEKERJAAN (D+E) 434,774.23
G PEMBULATAN 434,800.00

JENIS PEKERJAAN : Pemasangan Urinoir (Bahan dan Merk Sesuai RKS)


SATUAN : 1 bh
KODE : M.3.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.1000 114,300.00 11,430.00
Tukang L.02 OH 0.1000 123,300.00 12,330.00
Kepala tukang L.03 OH 0.0100 141,300.00 1,413.00
Mandor L.04 OH 0.0050 150,300.00 751.50
Jumlah Tenaga 25,924.50
B BAHAN
Urinoir Unit 1.0000 1,350,000.00 1,350,000.00
Perlengkapan 6% % 1.0000 81,000.00 81,000.00
Semen Portland Kg 6.0000 1,300.00 7,800.00
Pasir pasang M3 0.0010 300,000.00 300.00
Jumlah Bahan 1,439,100.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 1,465,024.50
E OVERHEAD & PROFIT 10% x D 146,502.45
F JUMLAH HARGA PEKERJAAN (D+E) 1,611,526.95
G PEMBULATAN 1,611,600.00

JENIS PEKERJAAN : Pemasangan Partisi / Sekat Urinoir (Bahan dan Merk Sesuai RKS)
SATUAN : 1 bh
KODE : M.3.Hit-a
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.1000 114,300.00 11,430.00
Tukang L.02 OH 0.1000 123,300.00 12,330.00
Kepala tukang L.03 OH 0.0100 141,300.00 1,413.00
Mandor L.04 OH 0.0050 150,300.00 751.50
Jumlah Tenaga 25,924.50
B BAHAN
Partisi / Sekat Urinoir Unit 1.0000 1,200,000.00 1,200,000.00
Perlengkapan 6% % 1.0000 72,000.00 72,000.00
Jumlah Bahan 1,272,000.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 1,297,924.50
E OVERHEAD & PROFIT 10% x D 129,792.45
F JUMLAH HARGA PEKERJAAN (D+E) 1,427,716.95
G PEMBULATAN 1,427,800.00

JENIS PEKERJAAN : Pemasangan Wastafel (Bahan dan Merk Sesuai RKS)


SATUAN : 1 bh
KODE : M.4.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.1200 114,300.00 13,716.00
Tukang L.02 OH 0.1450 123,300.00 17,878.50
Kepala tukang L.03 OH 0.0150 141,300.00 2,119.50
Mandor L.04 OH 0.0060 150,300.00 901.80
Jumlah Tenaga 34,615.80
B BAHAN
Wastafel Unit 1.0000 450,000.00 450,000.00
Perlengkapan 6% % 1.0000 27,000.00 27,000.00
Jumlah Bahan 477,000.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 511,615.80
E OVERHEAD & PROFIT 10% x D 51,161.58
F JUMLAH HARGA PEKERJAAN (D+E) 562,777.38
G PEMBULATAN 562,800.00

JENIS PEKERJAAN : Pemasangan Bak Fiberglass (Bahan dan Merk Sesuai RKS)
SATUAN : 1 bh
KODE : M.5.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.1000 114,300.00 11,430.00
Tukang L.02 OH 0.0750 123,300.00 9,247.50
Kepala tukang L.03 OH 0.0075 141,300.00 1,059.75
Mandor L.04 OH 0.0010 150,300.00 150.30
Jumlah Tenaga 21,887.55
B BAHAN
Bak Fiberglass Unit 1.0000 350,000.00 350,000.00
Perlengkapan 6 % % 1.0000 21,000.00 21,000.00
Jumlah Bahan 371,000.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 392,887.55
E OVERHEAD & PROFIT 10% x D 39,288.76
F JUMLAH HARGA PEKERJAAN (D+E) 432,176.31
G PEMBULATAN 432,200.00

JENIS PEKERJAAN : Pemasangan Floor drain (Bahan dan Merk Sesuai RKS)
SATUAN : 1 bh
KODE : M.6.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.0100 114,300.00 1,143.00
Tukang L.02 OH 0.1000 123,300.00 12,330.00
Kepala tukang L.03 OH 0.0100 141,300.00 1,413.00
Mandor L.04 OH 0.0050 150,300.00 751.50
Jumlah Tenaga 15,637.50
B BAHAN
Floor Drain Stainless Unit 1.0000 43,000.00 43,000.00
Jumlah Bahan 43,000.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 58,637.50
E OVERHEAD & PROFIT 10% x D 5,863.75
F JUMLAH HARGA PEKERJAAN (D+E) 64,501.25
G PEMBULATAN 64,600.00

JENIS PEKERJAAN : Pemasangan Kran 1/2 " (Bahan dan Merk Sesuai RKS)
SATUAN : 1 bh
KODE : M.7.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.0100 114,300.00 1,143.00
Tukang L.02 OH 0.1000 123,300.00 12,330.00
Kepala tukang L.03 OH 0.0100 141,300.00 1,413.00
Mandor L.04 OH 0.0050 150,300.00 751.50
Jumlah Tenaga 15,637.50
B BAHAN
Kran 1/2" Stainless Bh 1.0000 35,000.00 35,000.00
Seal Tape Bh 0.0250 6,000.00 150.00
Jumlah Bahan 35,150.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 50,787.50
E OVERHEAD & PROFIT 10% x D 5,078.75
F JUMLAH HARGA PEKERJAAN (D+E) 55,866.25
G PEMBULATAN 55,900.00

JENIS PEKERJAAN : Pemasangan Pipa PVC 1/2”


SATUAN : 1 m1
KODE : M.8.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.0360 114,300.00 4,114.80
Tukang L.02 OH 0.0600 123,300.00 7,398.00
Kepala tukang L.03 OH 0.0060 141,300.00 847.80
Mandor L.04 OH 0.0020 150,300.00 300.60
Jumlah Tenaga 12,661.20
B BAHAN
Pipa PVC AW 1/2" m1 1.2000 7,875.00 9,450.00
Assesories 35 % % 1.0000 3,307.50 3,307.50
Jumlah Bahan 12,757.50
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 25,418.70
E OVERHEAD & PROFIT 10% x D 2,541.87
F JUMLAH HARGA PEKERJAAN (D+E) 27,960.57
G PEMBULATAN 28,000.00

JENIS PEKERJAAN : Pemasangan Pipa PVC 3/4”


SATUAN : 1 m1
KODE : M.9.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.0360 114,300.00 4,114.80
Tukang L.02 OH 0.0600 123,300.00 7,398.00
Kepala tukang L.03 OH 0.0060 141,300.00 847.80
Mandor L.04 OH 0.0020 150,300.00 300.60
Jumlah Tenaga 12,661.20
B BAHAN
Pipa PVC AW 3/4" M 1.2000 10,700.00 12,840.00
Assesories 35 % % 1.0000 4,494.00 4,494.00
Jumlah Bahan 17,334.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 29,995.20
E OVERHEAD & PROFIT 10% x D 2,999.52
F JUMLAH HARGA PEKERJAAN (D+E) 32,994.72
G PEMBULATAN 33,000.00

JENIS PEKERJAAN : Pemasangan Pipa PVC 1”


SATUAN : 1 m1
KODE : M.10.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.0360 114,300.00 4,114.80
Tukang L.02 OH 0.0600 123,300.00
Kepala tukang L.03 OH 0.0060 141,300.00 847.80
Mandor L.04 OH 0.0020 150,300.00 300.60
Jumlah Tenaga 5,263.20
B BAHAN
Pipa PVC AW 1" M 1.2000 14,625.00 17,550.00
Assesories 35 % % 1.0000 6,142.50 6,142.50
Jumlah Bahan 23,692.50
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 28,955.70
E OVERHEAD & PROFIT 10% x D 2,895.57
F JUMLAH HARGA PEKERJAAN (D+E) 31,851.27
G PEMBULATAN 31,900.00

JENIS PEKERJAAN : Pemasangan pipa PVC 1 1/2”


SATUAN : 1 m1
KODE : M.11.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.0540 114,300.00 6,172.20
Tukang L.02 OH 0.0900 123,300.00 11,097.00
Kepala tukang L.03 OH 0.0090 141,300.00 1,271.70
Mandor L.04 OH 0.0030 150,300.00 450.90
Jumlah Tenaga 18,991.80
B BAHAN
Pipa PVC AW 1 1/2" M 1.2000 25,100.00 30,120.00
Assesories 35 % % 1.0000 10,542.00 10,542.00
Jumlah Bahan 40,662.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 59,653.80
E OVERHEAD & PROFIT 10% x D 5,965.38
F JUMLAH HARGA PEKERJAAN (D+E) 65,619.18
G PEMBULATAN 65,700.00

JENIS PEKERJAAN : Pemasangan pipa PVC 2”


SATUAN : 1 m1
KODE : M.12.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.0540 114,300.00 6,172.20
Tukang L.02 OH 0.0900 123,300.00 11,097.00
Kepala tukang L.03 OH 0.0090 141,300.00 1,271.70
Mandor L.04 OH 0.0030 150,300.00 450.90
Jumlah Tenaga 18,991.80
B BAHAN
Pipa PVC AW 2" M 1.2000 32,125.00 38,550.00
Assesories 35 % % 1.0000 13,492.50 13,492.50
Jumlah Bahan 52,042.50
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 71,034.30
E OVERHEAD & PROFIT 10% x D 7,103.43
F JUMLAH HARGA PEKERJAAN (D+E) 78,137.73
G PEMBULATAN 78,200.00

JENIS PEKERJAAN : Pemasangan Pipa PVC 3”


SATUAN : 1 m1
KODE : M.13.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.0810 114,300.00 9,258.30
Tukang L.02 OH 0.1350 123,300.00 16,645.50
Kepala tukang L.03 OH 0.0135 141,300.00 1,907.55
Mandor L.04 OH 0.0040 150,300.00 601.20
Jumlah Tenaga 28,412.55
B BAHAN
Pipa PVC AW 3" M 1.2000 65,975.00 79,170.00
Assesories 35 % % 1.0000 27,709.50 27,709.50
Jumlah Bahan 106,879.50
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 135,292.05
E OVERHEAD & PROFIT 10% x D 13,529.21
F JUMLAH HARGA PEKERJAAN (D+E) 148,821.26
G PEMBULATAN 148,900.00

JENIS PEKERJAAN : Pemasangan Pipa PVC 4"


SATUAN : 1 m1
KODE : M.14.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.0810 114,300.00 9,258.30
Tukang L.02 OH 0.1350 123,300.00 16,645.50
Kepala tukang L.03 OH 0.0135 141,300.00 1,907.55
Mandor L.04 OH 0.0040 150,300.00 601.20
Jumlah Tenaga 28,412.55
B BAHAN
Pipa PVC AW 4" M 1.2000 109,325.00 131,190.00
Assesories 35 % % 1.0000 45,916.50 45,916.50
Jumlah Bahan 177,106.50
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 205,519.05
E OVERHEAD & PROFIT 10% x D 20,551.91
F JUMLAH HARGA PEKERJAAN (D+E) 226,070.96
G PEMBULATAN 226,100.00

JENIS PEKERJAAN : Saluran Air Hujan Buis Beton 1/2 Ø 20 cm


SATUAN : 1 Bh
KODE : M.15.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.3800 114,300.00 43,434.00
Tukang L.02 OH 0.1900 123,300.00 23,427.00
Kepala tukang L.03 OH 0.0190 141,300.00 2,684.70
Mandor L.04 OH 0.0190 150,300.00 2,855.70
Jumlah Tenaga 72,401.40
B BAHAN
Buis Beton 1/2 dia 20 cm Bh 1.1000 68,000.00 74,800.00
Bata Merah Bh 25.0000 900.00 22,500.00
Semen Portland Kg 6.2400 1,300.00 8,112.00
Pasir pasang M3 0.0240 300,000.00 7,200.00
Pasir urug M3 0.0110 200,000.00 2,200.00
Jumlah Bahan 114,812.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 187,213.40
E OVERHEAD & PROFIT 10% x D 18,721.34
F JUMLAH HARGA PEKERJAAN (D+E) 205,934.74
G PEMBULATAN 206,000.00

JENIS PEKERJAAN : Saluran Air Hujan Buis Beton Ø 20 cm


SATUAN : 1 Bh
KODE : M.15.Hit-a
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.3800 114,300.00 43,434.00
Tukang L.02 OH 0.1900 123,300.00 23,427.00
Kepala tukang L.03 OH 0.0190 141,300.00 2,684.70
Mandor L.04 OH 0.0190 150,300.00 2,855.70
Jumlah Tenaga 72,401.40
B BAHAN
Buis Beton dia 20 cm Bh 1.1000 110,000.00 121,000.00
Bata Merah Bh 25.0000 900.00 22,500.00
Semen Portland Kg 6.2400 1,300.00 8,112.00
Pasir pasang M3 0.0240 300,000.00 7,200.00
Pasir urug M3 0.0110 200,000.00 2,200.00
Jumlah Bahan 161,012.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 233,413.40
E OVERHEAD & PROFIT 10% x D 23,341.34
F JUMLAH HARGA PEKERJAAN (D+E) 256,754.74
G PEMBULATAN 256,800.00

JENIS PEKERJAAN : Saluran Air Hujan Bata Merah lebar 20cm


SATUAN : 1 m1
KODE : M.16.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.2500 114,300.00 28,575.00
Tukang L.02 OH 0.2500 123,300.00 30,825.00
Kepala tukang L.03 OH 0.0250 141,300.00 3,532.50
Mandor L.04 OH 0.0025 150,300.00 375.75
Jumlah Tenaga 63,308.25
B BAHAN
Bata merah bh 26.0000 900.00 23,400.00
Semen Portland kg 17.0000 1,300.00 22,100.00
Pasir Pasang m3 0.0710 300,000.00 21,300.00
Pasir Beton m3 0.0064 300,000.00 1,920.00
Kerikil / Seplit m3 0.0074 300,000.00 2,220.00
Pasir Urug m3 0.0110 200,000.00 2,200.00
Air liter 2.1500 100.00 215.00
Jumlah Bahan 73,355.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 136,663.25
E OVERHEAD & PROFIT 10% x D 13,666.33
F JUMLAH HARGA PEKERJAAN (D+E) 150,329.58
G PEMBULATAN 150,400.00

JENIS PEKERJAAN : Septictank 1 x 1,50 x 1,50 m + Rembesan


SATUAN : 1 Unit
KODE : M.17.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA

Jumlah Tenaga -
B BAHAN
Galian Tanah Biasa Dalam 2 m B.2. m3 2.2500 120,600.00 271,350.00
Pasir urug m3 0.1070 200,000.00 21,400.00
Lantai Kerja Beton Mutu K-100 D.8. m3 1.1250 1,003,700.00 1,129,162.50
Bata Merah 1/2 Bata 1:3 F.3. m2 7.5000 158,400.00 1,188,000.00
Plat Beton tb. 12cm (110 kg Besi + Bekisting) K-175 D.28.Hit-b m3 0.1500 4,816,100.00 722,415.00
Plesteran 1:3 tebal 15mm G.1. m2 7.5000 81,600.00 612,000.00
Pipa PVC AW 4" m1 4.0000 109,325.00 437,300.00
Pipa PVC AW 1 1/2" m1 2.5000 16,733.33 41,833.33
Galian Tanah Biasa Dalam 1 m (Rembesan) B.1. m3 1.6880 98,500.00 166,268.00
Ijuk kg 2.7000 23,500.00 63,450.00
Kerikil / Seplit m3 0.5250 300,000.00 157,500.00
Pipa PVC AW 4" Berlobang m1 4.0000 109,325.00 437,300.00
Urugan Kembali Galian Tanah B.8. m3 0.5630 71,200.00 40,085.60
Jumlah Bahan 5,288,064.43
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 5,288,064.43
E OVERHEAD & PROFIT 10% x D 528,806.44
F JUMLAH HARGA PEKERJAAN (D+E) 5,816,870.88
G PEMBULATAN 5,816,900.00

JENIS PEKERJAAN : Pemasangan Pipa GIP 1 1/2"


SATUAN : 1 m1
KODE : M.18.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.1080 114,300.00 12,344.40
Tukang L.02 OH 0.1800 123,300.00 22,194.00
Kepala tukang L.03 OH 0.0180 141,300.00 2,543.40
Mandor L.04 OH 0.0050 150,300.00 751.50
Jumlah Tenaga 37,833.30
B BAHAN
Pipa GIP 1 1/2" M 1.2000 78,500.00 94,200.00
Assesories 35 % % 1.0000 32,970.00 32,970.00
Jumlah Bahan 127,170.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 165,003.30
E OVERHEAD & PROFIT 10% x D 16,500.33
F JUMLAH HARGA PEKERJAAN (D+E) 181,503.63
G PEMBULATAN 181,600.00

JENIS PEKERJAAN : Pemasangan Pipa GIP 2"


SATUAN : 1 m1
KODE : M.19.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.1215 114,300.00 13,887.45
Tukang L.02 OH 0.2025 123,300.00 24,968.25
Kepala tukang L.03 OH 0.0203 141,300.00 2,868.39
Mandor L.04 OH 0.0060 150,300.00 901.80
Jumlah Tenaga 42,625.89
B BAHAN
Pipa GIP 2" M 1.2000 105,000.00 126,000.00
Assesories 35 % % 1.0000 44,100.00 44,100.00
Jumlah Bahan 170,100.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 212,725.89
E OVERHEAD & PROFIT 10% x D 21,272.59
F JUMLAH HARGA PEKERJAAN (D+E) 233,998.48
G PEMBULATAN 234,000.00

JENIS PEKERJAAN : Pemasangan Pipa Galvanis 2"


SATUAN : 1 m1
KODE : M.19.Hit-a
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.1215 114,300.00 13,887.45
Tukang L.02 OH 0.2025 123,300.00 24,968.25
Kepala tukang L.03 OH 0.0203 141,300.00 2,868.39
Mandor L.04 OH 0.0060 150,300.00 901.80
Jumlah Tenaga 42,625.89
B BAHAN
Pipa Galvanis 2" M 1.2000 105,000.00 126,000.00
Assesories 35 % % 1.0000 44,100.00 44,100.00
Jumlah Bahan 170,100.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 212,725.89
E OVERHEAD & PROFIT 10% x D 21,272.59
F JUMLAH HARGA PEKERJAAN (D+E) 233,998.48
G PEMBULATAN 234,000.00

JENIS PEKERJAAN : Pemasangan Pintu PVC KM/WC


SATUAN : 1 Unit
KODE : M.20.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.0250 114,300.00 2,857.50
Tukang L.02 OH 0.2500 123,300.00 30,825.00
Kepala tukang L.03 OH 0.0250 141,300.00 3,532.50
Mandor L.04 OH 0.0150 150,300.00 2,254.50
Jumlah Tenaga 39,469.50
B BAHAN
Pintu PVC unit 1.0000 400,000.00 400,000.00
Jumlah Bahan 400,000.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 439,469.50
E OVERHEAD & PROFIT 10% x D 43,946.95
F JUMLAH HARGA PEKERJAAN (D+E) 483,416.45
G PEMBULATAN 483,500.00
Q. HARGA SATUAN PEKERJAAN ELEKTRIKAL

JENIS PEKERJAAN : Instalasi Titik Lampu Conduit Pipa PVC Ø 5/8"


SATUAN : 1 Titik
KODE : Q.1.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.3000 114,300.00 34,290.00
Tukang L.02 OH 0.1000 123,300.00 12,330.00
Jumlah Tenaga 46,620.00
B BAHAN
Kabel NYM 2x2,5 m1 4.0000 7,000.00 28,000.00
Pipa Conduit PVC Ø 5/8" batang 2.0000 15,000.00 30,000.00
Klem Pipa Conduit buah 3.0000 1,000.00 3,000.00
T-Doost buah 1.0000 10,100.00 10,100.00
Socket / Sambungan Conduit buah 1.0000 5,700.00 5,700.00
Fisher + Skrup buah 6.0000 600.00 3,600.00
Lasdop buah 2.0000 300.00 600.00
Jumlah Bahan 81,000.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 127,620.00
E OVERHEAD & PROFIT 10% x D 12,762.00
F JUMLAH HARGA PEKERJAAN (D+E) 140,382.00
G PEMBULATAN 140,400.00

JENIS PEKERJAAN : Instalasi Stop Kontak Conduit Pipa PVC Ø 5/8"


SATUAN : 1 Titik
KODE : Q.2.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.3000 114,300.00 34,290.00
Tukang L.02 OH 0.1000 123,300.00 12,330.00
Jumlah Tenaga 46,620.00
B BAHAN
Kabel NYM 3x2,5 m1 3.0000 12,000.00 36,000.00
Pipa Conduit PVC Ø 5/8" batang 1.0000 15,000.00 15,000.00
Klem Pipa Conduit buah 2.0000 1,000.00 2,000.00
T-Doost buah 1.0000 10,100.00 10,100.00
Socket / Sambungan Conduit buah 1.0000 5,700.00 5,700.00
Fisher + Skrup buah 4.0000 600.00 2,400.00
Lasdop buah 3.0000 300.00 900.00
Jumlah Bahan 72,100.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 118,720.00
E OVERHEAD & PROFIT 10% x D 11,872.00
F JUMLAH HARGA PEKERJAAN (D+E) 130,592.00
G PEMBULATAN 130,600.00

JENIS PEKERJAAN : Lampu SL 18 Watt


SATUAN : 1 Buah
KODE : Q.3.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.1000 114,300.00 11,430.00
Jumlah Tenaga 11,430.00
B BAHAN
Lampu SL / Pijar 18 watt buah 1.0000 37,500.00 37,500.00
Fitting / Dudukan Lampu SL buah 1.0000 15,000.00 15,000.00
Jumlah Bahan 52,500.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 63,930.00
E OVERHEAD & PROFIT 10% x D 6,393.00
F JUMLAH HARGA PEKERJAAN (D+E) 70,323.00
G PEMBULATAN 70,400.00

JENIS PEKERJAAN : Lampu TL 20 Watt


SATUAN : 1 Buah
KODE : Q.4.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.1000 114,300.00 11,430.00
Jumlah Tenaga 11,430.00
B BAHAN
Lampu TL / Neon 20 watt buah 1.0000 35,000.00 35,000.00
Kap / Dudukan Lampu TL / Neon 20 Watt buah 1.0000 51,300.00 51,300.00
Jumlah Bahan 86,300.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 97,730.00
E OVERHEAD & PROFIT 10% x D 9,773.00
F JUMLAH HARGA PEKERJAAN (D+E) 107,503.00
G PEMBULATAN 107,600.00

JENIS PEKERJAAN : Stop Kontak


SATUAN : 1 Buah
KODE : Q.5.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.1000 114,300.00 11,430.00
Jumlah Tenaga 11,430.00
B BAHAN
Stop Kontak Brocco buah 1.0000 15,000.00 15,000.00
Jumlah Bahan 15,000.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 26,430.00
E OVERHEAD & PROFIT 10% x D 2,643.00
F JUMLAH HARGA PEKERJAAN (D+E) 29,073.00
G PEMBULATAN 29,100.00

JENIS PEKERJAAN : Saklar Tunggal


SATUAN : 1 Buah
KODE : Q.6.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.1000 114,300.00 11,430.00
Jumlah Tenaga 11,430.00
B BAHAN
Saklar Tunggal Brocco buah 1.0000 15,000.00 15,000.00
Jumlah Bahan 15,000.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 26,430.00
E OVERHEAD & PROFIT 10% x D 2,643.00
F JUMLAH HARGA PEKERJAAN (D+E) 29,073.00
G PEMBULATAN 29,100.00

JENIS PEKERJAAN : Saklar Ganda


SATUAN : 1 Buah
KODE : Q.7.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.1000 114,300.00 11,430.00
Jumlah Tenaga 11,430.00
B BAHAN
Saklar Ganda Brocco buah 1.0000 18,000.00 18,000.00
Jumlah Bahan 18,000.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 29,430.00
E OVERHEAD & PROFIT 10% x D 2,943.00
F JUMLAH HARGA PEKERJAAN (D+E) 32,373.00
G PEMBULATAN 32,400.00

JENIS PEKERJAAN : MCB 1 Phase + Box


SATUAN : 1 Unit
KODE : Q.8.
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.1000 114,300.00 11,430.00
Jumlah Tenaga 11,430.00
B BAHAN
MCB 1 Pase buah 1.0000 65,000.00 65,000.00
Box MCB buah 1.0000 50,000.00 50,000.00
Jumlah Bahan 115,000.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 126,430.00
E OVERHEAD & PROFIT 10% x D 12,643.00
F JUMLAH HARGA PEKERJAAN (D+E) 139,073.00
G PEMBULATAN 139,100.00
N. HARGA SATUAN PEKERJAAN KUNCI DAN KACA

JENIS PEKERJAAN : Pemasangan Kunci Tanam


SATUAN : 1 Bh
KODE : N.1.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA KERJA
Pekerja L.01 OH 0.0100 114,300.00 1,143.00
Tukang L.02 OH 0.5000 123,300.00 61,650.00
Kepala Tukang L.03 OH 0.0500 141,300.00 7,065.00
Mandor L.04 OH 0.0050 150,300.00 751.50
Jumlah Tenaga 70,609.50
B BAHAN
Kunci Pintu Tanam Stainless Bh 1.0000 90,000.00 90,000.00
Jumlah Bahan 90,000.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 160,609.50
E OVERHEAD & PROFIT 10% x D 16,060.95
F JUMLAH HARGA PEKERJAAN (D+E) 176,670.45
G PEMBULATAN 176,700.00

JENIS PEKERJAAN : Pemasangan Engsel pintu


SATUAN : 1 Bh
KODE : N.2.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.0150 114,300.00 1,714.50
Tukang L.02 OH 0.1500 123,300.00 18,495.00
Kepala Tukang L.03 OH 0.0150 141,300.00 2,119.50
Mandor L.04 OH 0.0080 150,300.00 1,202.40
Jumlah Tenaga 23,531.40
B BAHAN
Engsel Pintu Stainless Bh 1.0000 49,000.00 49,000.00
Jumlah Bahan 49,000.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 72,531.40
E OVERHEAD & PROFIT 10% x D 7,253.14
F JUMLAH HARGA PEKERJAAN (D+E) 79,784.54
G PEMBULATAN 79,800.00

JENIS PEKERJAAN : Pemasangan Engsel jendela


SATUAN : 1 Bh
KODE : N.3.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.0100 114,300.00 1,143.00
Tukang L.02 OH 0.1000 123,300.00 12,330.00
Kepala Tukang L.03 OH 0.0100 141,300.00 1,413.00
Mandor L.04 OH 0.0050 150,300.00 751.50
Jumlah Tenaga 15,637.50
B BAHAN
Engsel Jendela Stainless Bh 1.0000 43,000.00 43,000.00
Jumlah Bahan 43,000.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 58,637.50
E OVERHEAD & PROFIT 10% x D 5,863.75
F JUMLAH HARGA PEKERJAAN (D+E) 64,501.25
G PEMBULATAN 64,600.00

JENIS PEKERJAAN : Pemasangan Slot jendela


SATUAN : 1 Bh
KODE : N.4.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.0100 114,300.00 1,143.00
Tukang L.02 OH 0.1000 123,300.00 12,330.00
Kepala Tukang L.03 OH 0.0100 141,300.00 1,413.00
Mandor L.04 OH 0.0050 150,300.00 751.50
Jumlah Tenaga 15,637.50
B BAHAN
Sloot Jendela Stainless Bh 1.0000 27,000.00 27,000.00
Jumlah Bahan 27,000.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 42,637.50
E OVERHEAD & PROFIT 10% x D 4,263.75
F JUMLAH HARGA PEKERJAAN (D+E) 46,901.25
G PEMBULATAN 47,000.00

JENIS PEKERJAAN : Pemasangan Kait angin


SATUAN : 1 Bh
KODE : N.5.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.0150 114,300.00 1,714.50
Tukang L.02 OH 0.1500 123,300.00 18,495.00
Kepala Tukang L.03 OH 0.0150 141,300.00 2,119.50
Mandor L.04 OH 0.0080 150,300.00 1,202.40
Jumlah Tenaga 23,531.40
B BAHAN
Hak Angin Stainless Bh 1.0000 27,000.00 27,000.00
Jumlah Bahan 27,000.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 50,531.40
E OVERHEAD & PROFIT 10% x D 5,053.14
F JUMLAH HARGA PEKERJAAN (D+E) 55,584.54
G PEMBULATAN 55,600.00

JENIS PEKERJAAN : Pemasangan Door closer


SATUAN : 1 Bh
KODE : N.6.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.0500 114,300.00 5,715.00
Tukang L.02 OH 0.5000 123,300.00 61,650.00
Kepala Tukang L.03 OH 0.0500 141,300.00 7,065.00
Mandor L.04 OH 0.0030 150,300.00 450.90
Jumlah Tenaga 74,880.90
B BAHAN
Door closer set 1.0000 175,000.00 175,000.00
Jumlah Bahan 175,000.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 249,880.90
E OVERHEAD & PROFIT 10% x D 24,988.09
F JUMLAH HARGA PEKERJAAN (D+E) 274,868.99
G PEMBULATAN 274,900.00

JENIS PEKERJAAN : Pemasangan Door stoper


SATUAN : 1 Bh
KODE : N.7.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.0100 114,300.00 1,143.00
Tukang L.02 OH 0.1000 123,300.00 12,330.00
Kepala Tukang L.03 OH 0.0100 141,300.00 1,413.00
Mandor L.04 OH 0.0050 150,300.00 751.50
Jumlah Tenaga 15,637.50
B BAHAN
Door stoper Bh 1.0000 35,000.00 35,000.00
Jumlah Bahan 35,000.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 50,637.50
E OVERHEAD & PROFIT 10% x D 5,063.75
F JUMLAH HARGA PEKERJAAN (D+E) 55,701.25
G PEMBULATAN 55,800.00

JENIS PEKERJAAN : Pemasangan Kaca tebal 5 mm


SATUAN : 1 m2
KODE : N.8.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.0150 114,300.00 1,714.50
Tukang L.02 OH 0.1500 123,300.00 18,495.00
Kepala Tukang L.03 OH 0.0150 141,300.00 2,119.50
Mandor L.04 OH 0.0008 150,300.00 120.24
Jumlah Tenaga 22,449.24
B BAHAN
Kaca Polos 5 mm m2 1.1000 115,000.00 126,500.00
Sealant Kg 0.0500 34,000.00 1,700.00
Jumlah Bahan 128,200.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 150,649.24
E OVERHEAD & PROFIT 10 % x D 15,064.92
F JUMLAH HARGA PEKERJAAN (D+E) 165,714.16
G PEMBULATAN 165,800.00
O. HARGA SATUAN PEKERJAAN KUSEN ALUMUNIUM

JENIS PEKERJAAN : Kusen Partisi Alm 2,20x1,60 m, Daun Multiplek 9 mm + Rangka Alumunium
SATUAN : 1 Unit
KODE : O.1.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.3000 114,300.00 34,290.00
Tukang L.02 OH 0.2500 123,300.00 30,825.00
Kepala Tukang L.03 OH 0.0250 141,300.00 3,532.50
Mandor L.04 OH 0.0300 150,300.00 4,509.00
Jumlah Tenaga 73,156.50
B BAHAN
Kusen Alumunium Natural 4" Alexindo m1 7.6000 100,000.00 760,000.00
Profil Alumunium Natural 8 cm m1 10.4400 60,000.00 626,400.00
Multiplek 9 mm lbr 1.1000 150,000.00 165,000.00
Asesories 5% % 1.0000 77,570.00 77,570.00
Sloot Pintu Stainless bh 4.0000 38,000.00 152,000.00
Handle psg 2.0000 22,500.00 45,000.00
Jumlah Harga 1,825,970.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 1,899,126.50
E OVERHEAD & PROFIT 10% x D 189,912.65
F JUMLAH HARGA PEKERJAAN (D+E) 2,089,039.15
G PEMBULATAN 2,089,100.00

JENIS PEKERJAAN : Daun Partisi Multiplek 9 mm, Rangka Alumunium


SATUAN : 1 Unit
KODE : O.1.Hit-a

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.3000 114,300.00 34,290.00
Tukang L.02 OH 0.2500 123,300.00 30,825.00
Kepala Tukang L.03 OH 0.0250 141,300.00 3,532.50
Mandor L.04 OH 0.0300 150,300.00 4,509.00
Jumlah Tenaga 73,156.50
B BAHAN
Profil Alumunium Natural 8 cm m1 10.4400 60,000.00 626,400.00
Multiplek 9 mm lbr 1.1000 150,000.00 165,000.00
Asesories 5% % 1.0000 39,570.00 39,570.00
Sloot Pintu Stainless bh 4.0000 38,000.00 152,000.00
Handle psg 2.0000 22,500.00 45,000.00
Jumlah Harga 1,027,970.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 1,101,126.50
E OVERHEAD & PROFIT 10% x D 110,112.65
F JUMLAH HARGA PEKERJAAN (D+E) 1,211,239.15
G PEMBULATAN 1,211,300.00

JENIS PEKERJAAN : Kusen Jendela Alumunium 0,70 x 1,60 m (1 lubang dgn 1 Daun Jendela)
SATUAN : 1 Unit
KODE : O.2.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.7500 114,300.00 85,725.00
Tukang L.02 OH 1.0000 123,300.00 123,300.00
Kepala Tukang L.03 OH 0.1000 141,300.00 14,130.00
Mandor L.04 OH 0.0750 150,300.00 11,272.50
Jumlah Tenaga 234,427.50
B BAHAN
Kusen Alumunium Natural 4" Alexindo m1 5.0000 100,000.00 500,000.00
Profil Alumunium Natural 6 cm m1 2.7000 45,000.00 121,500.00
Kaca Polos 5 mm m2 0.6800 115,000.00 78,200.00
Sloot Jendela Alumunium bh 1.0000 27,000.00 27,000.00
Casement 12" psg 1.0000 93,500.00 93,500.00
Asesories 5% % 1.0000 34,985.00 34,985.00
Jumlah Harga 855,185.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 1,089,612.50
E OVERHEAD & PROFIT 10% x D 108,961.25
F JUMLAH HARGA PEKERJAAN (D+E) 1,198,573.75
G PEMBULATAN 1,198,600.00

JENIS PEKERJAAN : Kusen Jendela Alumunium 1,35 x 1,60 m (2 lubang dgn 1 Daun Jendela)
SATUAN : 1 Unit
KODE : O.3.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.7500 114,300.00 85,725.00
Tukang L.02 OH 1.0000 123,300.00 123,300.00
Kepala Tukang L.03 OH 0.1000 141,300.00 14,130.00
Mandor L.04 OH 0.0750 150,300.00 11,272.50
Jumlah Tenaga 234,427.50
B BAHAN
Kusen Alumunium Natural 4" Alexindo m1 8.4000 100,000.00 840,000.00
Profil Alumunium Natural 6 cm m1 2.7000 45,000.00 121,500.00
Kaca Polos 5 mm m2 1.4900 115,000.00 171,350.00
Sloot Jendela Alumunium bh 1.0000 27,000.00 27,000.00
Casement 12" psg 1.0000 93,500.00 93,500.00
Asesories 5% % 1.0000 56,642.50 56,642.50
Jumlah Harga 1,309,992.50
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 1,544,420.00
E OVERHEAD & PROFIT 10% x D 154,442.00
F JUMLAH HARGA PEKERJAAN (D+E) 1,698,862.00
G PEMBULATAN 1,698,900.00

JENIS PEKERJAAN : Kusen Jendela Sliding Alumunium 1,35 x 1,60 m (2 lubang 2 daun)
SATUAN : 1 Unit
KODE : O.3.Hit-a

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.7500 114,300.00 85,725.00
Tukang L.02 OH 1.0000 123,300.00 123,300.00
Kepala Tukang L.03 OH 0.1000 141,300.00 14,130.00
Mandor L.04 OH 0.0750 150,300.00 11,272.50
Jumlah Tenaga 234,427.50
B BAHAN
Kusen Alumunium Natural 4" Alexindo m1 7.5500 100,000.00 755,000.00
Profil Alumunium Natural 6 cm m1 5.6000 45,000.00 252,000.00
Kaca Polos 5 mm m2 1.7300 115,000.00 198,950.00
Sloot Jendela Alumunium bh 1.0000 27,000.00 27,000.00
Roda Sliding bh 4.0000 15,000.00 60,000.00
Asesories 5% % 1.0000 60,297.50 60,297.50
Jumlah Harga 1,353,247.50
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 1,587,675.00
E OVERHEAD & PROFIT 10% x D 158,767.50
F JUMLAH HARGA PEKERJAAN (D+E) 1,746,442.50
G PEMBULATAN 1,746,500.00

JENIS PEKERJAAN : Kusen Jendela Alumunium 2,00 x 1,60 m (3 lubang dgn 2 Daun Jendela)
SATUAN : 1 Unit
KODE : O.4.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.7500 114,300.00 85,725.00
Tukang L.02 OH 1.0000 123,300.00 123,300.00
Kepala Tukang L.03 OH 0.1000 141,300.00 14,130.00
Mandor L.04 OH 0.0750 150,300.00 11,272.50
Jumlah Tenaga 234,427.50
B BAHAN
Kusen Alumunium Natural 4" Alexindo m1 11.8000 100,000.00 1,180,000.00
Profil Alumunium Natural 6 cm m1 5.4000 45,000.00 243,000.00
Kaca Polos 5 mm m2 2.1600 115,000.00 248,400.00
Sloot Jendela Alumunium bh 2.0000 27,000.00 54,000.00
Casement 12" psg 2.0000 93,500.00 187,000.00
Asesories 5% % 1.0000 83,570.00 83,570.00
Jumlah Harga 1,995,970.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 2,230,397.50
E OVERHEAD & PROFIT 10% x D 223,039.75
F JUMLAH HARGA PEKERJAAN (D+E) 2,453,437.25
G PEMBULATAN 2,453,500.00

JENIS PEKERJAAN : Kusen Jendela Sliding Alumunium 2,00 x 1,60 m (3 lubang 2 Daun)
SATUAN : 1 Unit
KODE : O.4.Hit-a

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.7500 114,300.00 85,725.00
Tukang L.02 OH 1.0000 123,300.00 123,300.00
Kepala Tukang L.03 OH 0.1000 141,300.00 14,130.00
Mandor L.04 OH 0.0750 150,300.00 11,272.50
Jumlah Tenaga 234,427.50
B BAHAN
Kusen Alumunium Natural 4" Alexindo m1 10.9500 100,000.00 1,095,000.00
Profil Alumunium Natural 6 cm m1 5.6000 45,000.00 252,000.00
Kaca Polos 5 mm m2 2.2400 115,000.00 257,600.00
Sloot Jendela Alumunium bh 1.0000 27,000.00 27,000.00
Roda Sliding bh 4.0000 15,000.00 60,000.00
Asesories 5% % 1.0000 80,230.00 80,230.00
Jumlah Harga 1,771,830.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 2,006,257.50
E OVERHEAD & PROFIT 10% x D 200,625.75
F JUMLAH HARGA PEKERJAAN (D+E) 2,206,883.25
G PEMBULATAN 2,206,900.00
JENIS PEKERJAAN : Kusen Jendela Alumunium 2,65 x 1,60 m (4 lubang dgn 2 Daun Jendela)
SATUAN : 1 Unit
KODE : O.5.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.7500 114,300.00 85,725.00
Tukang L.02 OH 1.0000 123,300.00 123,300.00
Kepala Tukang L.03 OH 0.1000 141,300.00 14,130.00
Mandor L.04 OH 0.0750 150,300.00 11,272.50
Jumlah Tenaga 234,427.50
B BAHAN
Kusen Alumunium Natural 4" Alexindo m1 15.2000 100,000.00 1,520,000.00
Profil Alumunium Natural 6 cm m1 5.4000 45,000.00 243,000.00
Kaca Polos 5 mm m2 2.9700 115,000.00 341,550.00
Sloot Jendela Alumunium bh 2.0000 27,000.00 54,000.00
Casement 12" psg 2.0000 93,500.00 187,000.00
Asesories 5% % 1.0000 105,227.50 105,227.50
Jumlah Harga 2,450,777.50
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 2,685,205.00
E OVERHEAD & PROFIT 10% x D 268,520.50
F JUMLAH HARGA PEKERJAAN (D+E) 2,953,725.50
G PEMBULATAN 2,953,800.00

JENIS PEKERJAAN : Kusen Jendela Sliding Alumunium 2,65 x 1,60 m (4 lubang 2 Daun)
SATUAN : 1 Unit
KODE : O.5.Hit-a

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.7500 114,300.00 85,725.00
Tukang L.02 OH 1.0000 123,300.00 123,300.00
Kepala Tukang L.03 OH 0.1000 141,300.00 14,130.00
Mandor L.04 OH 0.0750 150,300.00 11,272.50
Jumlah Tenaga 234,427.50
B BAHAN
Kusen Alumunium Natural 4" Alexindo m1 14.3500 100,000.00 1,435,000.00
Profil Alumunium Natural 6 cm m1 5.6000 45,000.00 252,000.00
Kaca Polos 5 mm m2 3.0500 115,000.00 350,750.00
Sloot Jendela Alumunium bh 1.0000 27,000.00 27,000.00
Roda Sliding bh 4.0000 15,000.00 60,000.00
Asesories 5% % 1.0000 101,887.50 101,887.50
Jumlah Harga 2,226,637.50
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 2,461,065.00
E OVERHEAD & PROFIT 10% x D 246,106.50
F JUMLAH HARGA PEKERJAAN (D+E) 2,707,171.50
G PEMBULATAN 2,707,200.00

JENIS PEKERJAAN : Kusen Bouvenligh Alumunium 0,70 x 0,70 m (1 lubang)


SATUAN : 1 Unit
KODE : O.6.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.7500 114,300.00 85,725.00
Tukang L.02 OH 0.3125 123,300.00 38,531.25
Kepala Tukang L.03 OH 0.0313 141,300.00 4,422.69
Mandor L.04 OH 0.0750 150,300.00 11,272.50
Jumlah Tenaga 139,951.44
B BAHAN
Kusen Alumunium Natural 4" Alexindo m1 3.0000 100,000.00 300,000.00
Kaca Polos 5 mm m2 0.3150 115,000.00 36,225.00
Asesories 5% % 1.0000 16,811.25 16,811.25
Jumlah Harga 353,036.25
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 492,987.69
E OVERHEAD & PROFIT 10% x D 49,298.77
F JUMLAH HARGA PEKERJAAN (D+E) 542,286.46
G PEMBULATAN 542,300.00

JENIS PEKERJAAN : Kusen Bouvenligh Alumunium 1,35 x 0,70 m (2 lubang)


SATUAN : 1 Unit
KODE : O.7.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.7500 114,300.00 85,725.00
Tukang L.02 OH 0.3125 123,300.00 38,531.25
Kepala Tukang L.03 OH 0.0313 141,300.00 4,422.69
Mandor L.04 OH 0.0750 150,300.00 11,272.50
Jumlah Tenaga 139,951.44
B BAHAN
Kusen Alumunium Natural 4" Alexindo m1 5.0000 100,000.00 500,000.00
Kaca Polos 5 mm m2 0.6300 115,000.00 72,450.00
Asesories 5% % 1.0000 28,622.50 28,622.50
Jumlah Harga 601,072.50
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 741,023.94
E OVERHEAD & PROFIT 10% x D 74,102.39
F JUMLAH HARGA PEKERJAAN (D+E) 815,126.33
G PEMBULATAN 815,200.00

JENIS PEKERJAAN : Kusen Bouvenligh Alumunium 2,00 x 0,70 m (3 lubang)


SATUAN : 1 Unit
KODE : O.8.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.7500 114,300.00 85,725.00
Tukang L.02 OH 0.5000 123,300.00 61,650.00
Kepala Tukang L.03 OH 0.0500 141,300.00 7,065.00
Mandor L.04 OH 0.0750 150,300.00 11,272.50
Jumlah Tenaga 165,712.50
B BAHAN
Kusen Alumunium Natural 4" Alexindo m1 7.0000 100,000.00 700,000.00
Kaca Polos 5 mm m2 1.0000 115,000.00 115,000.00
Asesories 5% % 1.0000 40,750.00 40,750.00
Jumlah Harga 855,750.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 1,021,462.50
E OVERHEAD & PROFIT 10% x D 102,146.25
F JUMLAH HARGA PEKERJAAN (D+E) 1,123,608.75
G PEMBULATAN 1,123,700.00
JENIS PEKERJAAN : Kusen Bouvenligh Alumunium 2,65 x 0,70 m (4 lubang)
SATUAN : 1 Unit
KODE : O.9.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.7500 114,300.00 85,725.00
Tukang L.02 OH 0.5000 123,300.00 61,650.00
Kepala Tukang L.03 OH 0.0500 141,300.00 7,065.00
Mandor L.04 OH 0.0750 150,300.00 11,272.50
Jumlah Tenaga 165,712.50
B BAHAN
Kusen Alumunium Natural 4" Alexindo m1 9.0000 100,000.00 900,000.00
Kaca Polos 5 mm m2 1.2600 115,000.00 144,900.00
Asesories 5% % 1.0000 52,245.00 52,245.00
Jumlah Harga 1,097,145.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 1,262,857.50
E OVERHEAD & PROFIT 10% x D 126,285.75
F JUMLAH HARGA PEKERJAAN (D+E) 1,389,143.25
G PEMBULATAN 1,389,200.00

JENIS PEKERJAAN : Kusen Alumunium Sopi - sopi


SATUAN : 1 Pasang
KODE : O.10.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.7500 114,300.00 85,725.00
Tukang L.02 OH 0.5000 123,300.00 61,650.00
Kepala Tukang L.03 OH 0.0500 141,300.00 7,065.00
Mandor L.04 OH 0.0750 150,300.00 11,272.50
Jumlah Tenaga 165,712.50
B BAHAN
Kusen Alumunium Natural 4" Alexindo m1 5.1000 100,000.00 510,000.00
Jalusi Alumunium m1 8.0000 55,000.00 440,000.00
Asesories 5% % 1.0000 47,500.00 47,500.00
Jumlah Harga 997,500.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 1,163,212.50
E OVERHEAD & PROFIT 10% x D 116,321.25
F JUMLAH HARGA PEKERJAAN (D+E) 1,279,533.75
G PEMBULATAN 1,279,600.00

JENIS PEKERJAAN : Kusen Pintu Alumunium 0,9 x 2,8 m (Daun Pintu Panel Multyplek 9mm)
SATUAN : 1 Unit
KODE : O.11.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.7500 114,300.00 85,725.00
Tukang L.02 OH 0.2500 123,300.00 30,825.00
Kepala Tukang L.03 OH 0.0250 141,300.00 3,532.50
Mandor L.04 OH 0.0750 150,300.00 11,272.50
Jumlah Tenaga 131,355.00
B BAHAN
Kusen Alumunium Natural 4" Alexindo m1 7.4000 100,000.00 740,000.00
Kaca Polos 5 mm m2 0.4200 115,000.00 48,300.00
Daun Pintu Panel Multiplek tb 9mm, Rangka Alumunium K.2. Unit 1.0000 700,651.44 700,651.44
Kayu Balok Kelas II m3 0.0070 2,500,000.00 17,500.00
Engsel Pintu Stainless psg 1.5000 49,000.00 73,500.00
Kunci Pintu Tanam Stainless bh 1.0000 90,000.00 90,000.00
Asesories 5% % 1.0000 39,415.00 39,415.00
Jumlah Harga 1,709,366.44
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 1,840,721.44
E OVERHEAD & PROFIT 10% x D 184,072.14
F JUMLAH HARGA PEKERJAAN (D+E) 2,024,793.58
G PEMBULATAN 2,024,800.00

JENIS PEKERJAAN : Kusen Pintu Alumunium 0,9 x 2,8 m (Daun Pintu Panel Spandrel Alumunium)
SATUAN : 1 Unit
KODE : O.11.Hit-a

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.7500 114,300.00 85,725.00
Tukang L.02 OH 0.2500 123,300.00 30,825.00
Kepala Tukang L.03 OH 0.0250 141,300.00 3,532.50
Mandor L.04 OH 0.0750 150,300.00 11,272.50
Jumlah Tenaga 131,355.00
B BAHAN
Kusen Alumunium Natural 4" Alexindo m1 7.4000 100,000.00 740,000.00
Kaca Polos 5 mm m2 0.4200 115,000.00 48,300.00
Daun Pintu Panel Spandrel Alumunium, Rangka Alumuniu K.3. Unit 1.0000 1,157,401.44 1,157,401.44
Kayu Balok Kelas II m3 0.0070 2,500,000.00 17,500.00
Engsel Pintu Stainless psg 1.5000 49,000.00 73,500.00
Kunci Pintu Tanam Stainless bh 1.0000 90,000.00 90,000.00
Asesories 5% % 1.0000 39,415.00 39,415.00
Jumlah Harga 2,166,116.44
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 2,297,471.44
E OVERHEAD & PROFIT 10% x D 229,747.14
F JUMLAH HARGA PEKERJAAN (D+E) 2,527,218.58
G PEMBULATAN 2,527,300.00

JENIS PEKERJAAN : Pemasangan Daun Pintu Alumunium (Daun Pintu Panel Multyplek 9mm)
SATUAN : 1 Unit
KODE : O.11.Hit-b

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.2500 114,300.00 28,575.00
Tukang L.02 OH 0.1300 123,300.00 16,029.00
Jumlah Tenaga 44,604.00
B BAHAN
Daun Pintu Panel Multiplek tb 9mm, Rangka Alumunium K.2. Unit 1.0000 700,651.44 700,651.44
Engsel Pintu Stainless psg 1.5000 49,000.00 73,500.00
Kunci Pintu Tanam Stainless bh 1.0000 90,000.00 90,000.00
Jumlah Harga 864,151.44
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 908,755.44
E OVERHEAD & PROFIT 10% x D 90,875.54
F JUMLAH HARGA PEKERJAAN (D+E) 999,630.98
G PEMBULATAN 999,700.00
JENIS PEKERJAAN : Kusen Pintu Alumunium 0,9 x 2,0 m (Daun Pintu Panel Multyplek 9mm)
SATUAN : 1 Unit
KODE : O.11.Hit-c

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.7500 114,300.00 85,725.00
Tukang L.02 OH 0.2500 123,300.00 30,825.00
Kepala Tukang L.03 OH 0.0250 141,300.00 3,532.50
Mandor L.04 OH 0.0750 150,300.00 11,272.50
Jumlah Tenaga 131,355.00
B BAHAN
Kusen Alumunium Natural 4" Alexindo m1 4.9000 100,000.00 490,000.00
Daun Pintu Panel Multiplek tb 9mm, Rangka Alumunium K.2. Unit 1.0000 700,651.44 700,651.44
Kayu Balok Kelas II m3 0.0070 2,500,000.00 17,500.00
Engsel Pintu Stainless psg 1.5000 49,000.00 73,500.00
Kunci Pintu Tanam Stainless bh 1.0000 90,000.00 90,000.00
Asesories 5% % 1.0000 24,500.00 24,500.00
Jumlah Harga 1,396,151.44
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 1,527,506.44
E OVERHEAD & PROFIT 10% x D 152,750.64
F JUMLAH HARGA PEKERJAAN (D+E) 1,680,257.08
G PEMBULATAN 1,680,300.00

JENIS PEKERJAAN : Kusen Pintu Alumunium 1,7 x 2,8 m (Daun Pintu Panel Multyplek Lapis HPL)
SATUAN : 1 Unit
KODE : O.12.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.7500 114,300.00 85,725.00
Tukang L.02 OH 0.2500 123,300.00 30,825.00
Kepala Tukang L.03 OH 0.0250 141,300.00 3,532.50
Mandor L.04 OH 0.0750 150,300.00 11,272.50
Jumlah Tenaga 131,355.00
B BAHAN
Kusen Alumunium Natural 4" Alexindo m1 9.6000 100,000.00 960,000.00
Kaca Polos 5 mm m2 0.8500 115,000.00 97,750.00
Daun Pintu Panel Multiplek tb 9mm Lapis HPL, Rangka A K.4. Unit 2.0000 864,651.44 1,729,302.88
Kayu Balok Kelas II m3 0.0140 2,500,000.00 35,000.00
Engsel Pintu Stainless psg 3.0000 49,000.00 147,000.00
Kunci Pintu Tanam Stainless bh 1.0000 90,000.00 90,000.00
Door Closer bh 1.0000 175,000.00 175,000.00
Sloot Pintu Tanam psg 1.0000 75,000.00 75,000.00
Asesories 5% % 1.0000 52,887.50 52,887.50
Jumlah Harga 3,361,940.38
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 3,493,295.38
E OVERHEAD & PROFIT 10% x D 349,329.54
F JUMLAH HARGA PEKERJAAN (D+E) 3,842,624.92
G PEMBULATAN 3,842,700.00

JENIS PEKERJAAN : Kusen Pintu Alumunium 1,7 x 2,8 m (Daun Pintu Panel Multyplek)
SATUAN : 1 Unit
KODE : O.12.Hit-a

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.7500 114,300.00 85,725.00
Tukang L.02 OH 0.2500 123,300.00 30,825.00
Kepala Tukang L.03 OH 0.0250 141,300.00 3,532.50
Mandor L.04 OH 0.0750 150,300.00 11,272.50
Jumlah Tenaga 131,355.00
B BAHAN
Kusen Alumunium Natural 4" Alexindo m1 9.6000 100,000.00 960,000.00
Kaca Polos 5 mm m2 0.8500 115,000.00 97,750.00
Daun Pintu Panel Multiplek tb 9mm, Rangka Alumunium K.2. Unit 2.0000 700,651.44 1,401,302.88
Kayu Balok Kelas II m3 0.0140 2,500,000.00 35,000.00
Engsel Pintu Stainless psg 3.0000 49,000.00 147,000.00
Kunci Pintu Tanam Stainless bh 1.0000 90,000.00 90,000.00
Door Closer bh 1.0000 175,000.00 175,000.00
Sloot Pintu Tanam psg 1.0000 75,000.00 75,000.00
Asesories 5% % 1.0000 52,887.50 52,887.50
Jumlah Harga 3,033,940.38
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 3,165,295.38
E OVERHEAD & PROFIT 10% x D 316,529.54
F JUMLAH HARGA PEKERJAAN (D+E) 3,481,824.92
G PEMBULATAN 3,481,900.00

JENIS PEKERJAAN : Kusen Pintu Alumunium 1,5 x 2,60 m (Daun Pintu Panel Multyplek Lapis HPL)
SATUAN : 1 Unit
KODE : O.12.Hit-b

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.7500 114,300.00 85,725.00
Tukang L.02 OH 0.2500 123,300.00 30,825.00
Kepala Tukang L.03 OH 0.0250 141,300.00 3,532.50
Mandor L.04 OH 0.0750 150,300.00 11,272.50
Jumlah Tenaga 131,355.00
B BAHAN
Kusen Alumunium Natural 4" Alexindo m1 8.2000 100,000.00 820,000.00
Kaca Polos 5 mm m2 0.8500 115,000.00 97,750.00
Daun Pintu Panel Multiplek tb 9mm Lapis HPL, Rangka A K.4. Unit 2.0000 864,651.44 1,729,302.88
Kayu Balok Kelas II m3 0.0140 2,500,000.00 35,000.00
Engsel Pintu Stainless psg 3.0000 49,000.00 147,000.00
Kunci Pintu Tanam Stainless bh 1.0000 90,000.00 90,000.00
Door Closer bh 1.0000 175,000.00 175,000.00
Sloot Pintu Tanam psg 1.0000 75,000.00 75,000.00
Asesories 5% % 1.0000 45,887.50 45,887.50
Jumlah Harga 3,214,940.38
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 3,346,295.38
E OVERHEAD & PROFIT 10% x D 334,629.54
F JUMLAH HARGA PEKERJAAN (D+E) 3,680,924.92

JENIS PEKERJAAN : Kusen Pintu & Jendela Alm 1,55 x 2,80 m (1 lb. Pintu + 1 lb. Jendela Mati)
SATUAN : 1 Unit
KODE : O.13.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 1.5000 114,300.00 171,450.00
Tukang L.02 OH 1.0000 123,300.00 123,300.00
Kepala Tukang L.03 OH 0.1000 141,300.00 14,130.00
Mandor L.04 OH 0.1500 150,300.00 22,545.00
Jumlah Tenaga 331,425.00
B BAHAN
Kusen Alumunium Natural 4" Alexindo m1 10.6000 100,000.00 1,060,000.00
Kaca Polos 5 mm m2 1.2100 115,000.00 139,150.00
Daun Pintu Panel Multiplek tb 9mm, Rangka Alumunium K.2. Unit 1.0000 700,651.44 700,651.44
Kayu Balok Kelas II m3 0.0070 2,500,000.00 17,500.00
Engsel Pintu Stainless psg 1.5000 49,000.00 73,500.00
Kunci Pintu Tanam Stainless bh 1.0000 90,000.00 90,000.00
Asesories 5% % 1.0000 59,957.50 59,957.50
Jumlah Harga 2,140,758.94
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 2,472,183.94
E OVERHEAD & PROFIT 10% x D 247,218.39
F JUMLAH HARGA PEKERJAAN (D+E) 2,719,402.33
G PEMBULATAN 2,719,500.00

JENIS PEKERJAAN : Kusen Pintu & Jendela Alm 2,20 x 2,80 m (1 lb. Pintu + 2 lb. 1 Daun Jendela)
SATUAN : 1 Unit
KODE : O.14.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 1.5000 114,300.00 171,450.00
Tukang L.02 OH 1.0000 123,300.00 123,300.00
Kepala Tukang L.03 OH 0.1000 141,300.00 14,130.00
Mandor L.04 OH 0.1500 150,300.00 22,545.00
Jumlah Tenaga 331,425.00
B BAHAN
Kusen Alumunium Natural 4" Alexindo m1 14.0000 100,000.00 1,400,000.00
Profil Alumunium Natural 6 cm m1 2.7000 45,000.00 121,500.00
Kaca Polos 5 mm m2 1.8900 115,000.00 217,350.00
Daun Pintu Panel Multiplek tb 9mm, Rangka Alumunium K.2. Unit 1.0000 700,651.44 700,651.44
Kayu Balok Kelas II m3 0.0070 2,500,000.00 17,500.00
Sloot Jendela Alumunium bh 1.0000 27,000.00 27,000.00
Casement 12" psg 1.0000 93,500.00 93,500.00
Engsel Pintu Stainless psg 1.5000 49,000.00 73,500.00
Kunci Pintu Tanam Stainless bh 1.0000 90,000.00 90,000.00
Asesories 5% % 1.0000 86,942.50 86,942.50
Jumlah Harga 2,827,943.94
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 3,159,368.94
E OVERHEAD & PROFIT 10% x D 315,936.89
F JUMLAH HARGA PEKERJAAN (D+E) 3,475,305.83
G PEMBULATAN 3,475,400.00

JENIS PEKERJAAN : Kusen Pintu & Jendela Sliding Alm 2,20 x 2,80 m (1 lb. Pintu + 2 lb 2 Daun)
SATUAN : 1 Unit
KODE : O.14.Hit-a

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 1.5000 114,300.00 171,450.00
Tukang L.02 OH 1.0000 123,300.00 123,300.00
Kepala Tukang L.03 OH 0.1000 141,300.00 14,130.00
Mandor L.04 OH 0.1500 150,300.00 22,545.00
Jumlah Tenaga 331,425.00
B BAHAN
Kusen Alumunium Natural 4" Alexindo m1 13.1500 100,000.00 1,315,000.00
Profil Alumunium Natural 6 cm m1 5.6000 45,000.00 252,000.00
Kaca Polos 5 mm m2 1.8300 115,000.00 210,450.00
Daun Pintu Panel Multiplek tb 9mm, Rangka Alumunium K.2. Unit 1.0000 700,651.44 700,651.44
Kayu Balok Kelas II m3 0.0070 2,500,000.00 17,500.00
Sloot Jendela Alumunium bh 1.0000 27,000.00 27,000.00
Roda Sliding bh 4.0000 15,000.00 60,000.00
Engsel Pintu Stainless psg 1.5000 49,000.00 73,500.00
Kunci Pintu Tanam Stainless bh 1.0000 90,000.00 90,000.00
Asesories 5% % 1.0000 88,872.50 88,872.50
Jumlah Harga 2,834,973.94
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 3,166,398.94
E OVERHEAD & PROFIT 10% x D 316,639.89
F JUMLAH HARGA PEKERJAAN (D+E) 3,483,038.83
G PEMBULATAN 3,483,100.00

JENIS PEKERJAAN : Kusen Pintu & Jendela Alm 2,85 x 2,80 m (1 lb. Pintu + 3 lb. 2 Daun Jendela)
SATUAN : 1 Unit
KODE : O.15.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 2.0000 114,300.00 228,600.00
Tukang L.02 OH 1.0000 123,300.00 123,300.00
Kepala Tukang L.03 OH 0.1000 141,300.00 14,130.00
Mandor L.04 OH 0.2000 150,300.00 30,060.00
Jumlah Tenaga 396,090.00
B BAHAN
Kusen Alumunium Natural 4" Alexindo m1 17.4000 100,000.00 1,740,000.00
Profil Alumunium Natural 6 cm m1 5.4000 45,000.00 243,000.00
Kaca Polos 5 mm m2 2.5600 115,000.00 294,400.00
Daun Pintu Panel Multiplek tb 9mm, Rangka Alumunium K.2. Unit 1.0000 700,651.44 700,651.44
Kayu Balok Kelas II m3 0.0070 2,500,000.00 17,500.00
Sloot Jendela Alumunium bh 2.0000 27,000.00 54,000.00
Casement 12" psg 2.0000 93,500.00 187,000.00
Engsel Pintu Stainless psg 1.5000 49,000.00 73,500.00
Kunci Pintu Tanam Stainless bh 1.0000 90,000.00 90,000.00
Asesories 5% % 1.0000 113,870.00 113,870.00
Jumlah Harga 3,513,921.44
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 3,910,011.44
E OVERHEAD & PROFIT 10% x D 391,001.14
F JUMLAH HARGA PEKERJAAN (D+E) 4,301,012.58
G PEMBULATAN 4,301,100.00

JENIS PEKERJAAN : Kusen Pintu & Jendela Sliding Alm 2,85 x 2,80 m (1 lb. Pintu + 3 lb. 2 Daun)
SATUAN : 1 Unit
KODE : O.15.Hit-a

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 2.0000 114,300.00 228,600.00
Tukang L.02 OH 1.0000 123,300.00 123,300.00
Kepala Tukang L.03 OH 0.1000 141,300.00 14,130.00
Mandor L.04 OH 0.2000 150,300.00 30,060.00
Jumlah Tenaga 396,090.00
B BAHAN
Kusen Alumunium Natural 4" Alexindo m1 16.5500 100,000.00 1,655,000.00
Profil Alumunium Natural 6 cm m1 5.6000 45,000.00 252,000.00
Kaca Polos 5 mm m2 2.6400 115,000.00 303,600.00
Daun Pintu Panel Multiplek tb 9mm, Rangka Alumunium K.2. Unit 1.0000 700,651.44 700,651.44
Kayu Balok Kelas II m3 0.0070 2,500,000.00 17,500.00
Sloot Jendela Alumunium bh 1.0000 27,000.00 27,000.00
Roda Sliding bh 4.0000 15,000.00 60,000.00
Engsel Pintu Stainless psg 1.5000 49,000.00 73,500.00
Kunci Pintu Tanam Stainless bh 1.0000 90,000.00 90,000.00
Asesories 5% % 1.0000 110,530.00 110,530.00
Jumlah Harga 3,289,781.44
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 3,685,871.44
E OVERHEAD & PROFIT 10% x D 368,587.14
F JUMLAH HARGA PEKERJAAN (D+E) 4,054,458.58
G PEMBULATAN 4,054,500.00

JENIS PEKERJAAN : Penambahan & Pemasangan Kembali Kusen Alumunium Existing


SATUAN : 1 m1
KODE : O.16.

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A TENAGA
Pekerja L.01 OH 0.7500 114,300.00 85,725.00
Tukang L.02 OH 0.5000 123,300.00 61,650.00
Kepala Tukang L.03 OH 0.0500 141,300.00 7,065.00
Mandor L.04 OH 0.0500 150,300.00 7,515.00
Jumlah Tenaga 161,955.00
B BAHAN
Kusen Alumunium Natural 4" Alexindo m1 1.0000 100,000.00 100,000.00
Profil Alumunium Natural 6 cm m1 1.0000 45,000.00 45,000.00
Asesories 5% % 1.0000 7,250.00 7,250.00
Jumlah Harga 152,250.00
C PERALATAN

Jumlah Alat
D JUMLAH (A+B+C) 314,205.00
E OVERHEAD & PROFIT 10% x D 31,420.50
F JUMLAH HARGA PEKERJAAN (D+E) 345,625.50
G PEMBULATAN 345,700.00