I PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi
- Excavator Unit 1.00 3,000,000.00 3,000,000.00
- Crane Unit 1.00 10,000,000.00 10,000,000.00
Jumlah = 4,168,939,435.41
PPN 10% = 416,893,943.54
Total Nilai = 4,585,833,378.95
Dibulatkan = 4,585,833,000.00
TERBILANG :
H. MUHAMMAD GHOZALI
Direktur