1 2 3
A PEKERJAAN PERSIAPAN 138.248.092,94
B GEDUNG RADIOLOGI & REKAM MEDIK
B.I PEKERJAAN PENDAHULUAN 9.535.772,40
B.II PEKERJAAN TANAH 135.554.650,70
B.III PEKERJAAN STRUKTUR PONDASI 222.867.075,31
B.IV PEKERJAAN STRUKTUR LANTAI ATAP 106.219.556,62
B.V PEKERJAAN PENUTUP ATAP 563.344.471,00
B.VI PEKERJAAN PASANGAN DAN PLESTERAN 324.862.478,92
B.VII PEKERJAAN KUSEN 65.563.500,00
B.VIII PEKERJAAN PENUTUP LANTAI 624.381.698,15
B.IX PEKERJAAN PLAFOND 227.158.111,08
B.X PEKERJAAN PENGECATAN 103.102.473,43
B.XI PEKERJAAN SANITAIR 32.183.059,00
C GEDUNG LAB & FARMASI
C.I PEKERJAAN PENDAHULUAN 9.535.772,40
C.II PEKERJAAN TANAH 118.257.923,90
C.III PEKERJAAN PONDASI 229.021.523,55
C.IV PEKERJAAN STRUKTUR LANTAI 1 44.379.439,49
C.V PEKERJAAN STRUKTUR LANTAI ATAP 67.619.593,97
C.VI PEKERJAAN PENUTUP ATAP 559.087.904,00
C.VII PEKERJAAN PASANGAN DAN PLESTERAN 346.947.053,73
C.VIII PEKERJAAN KUSEN 56.759.000,00
C.IX PEKERJAAN PENUTUP LANTAI 292.251.649,87
C.X PEKERJAAN PLAFOND 219.812.256,49
C.XI PEKERJAAN PENGECATAN 112.947.144,13
C.XII PEKERJAAN SANITAIR 25.022.208,03
D PEKERJAAN PLUMBING, MEKANIKAL DAN ELEKTRIKAL
RADIOLOGI & REKAMEDIK
D.I PEKERJAAN PLUMBING LANDSCAPE 12.430.500,00
D.II PEKERJAAN PLUMBING DENAH LANTAI 1 26.487.475,00
D.III PEKERJAAN MEKANIKAL DAN ELECTRIKAL 246.496.200,00
E PEKERJAAN PLUMBING, MEKANIKAL, ELEKTRIKAL
LABORATORIUM & FARMASI
E. I PEKERJAAN PLUMBING LANDSCAPE 23.400.600,00
E. II PEKERJAAN PLUMBING DENAH LANTAI 1 70.091.225,00
E. III PEKERJAAN MEKANIKAL DAN ELECTRIKAL 323.212.500,00
Lima Milyar Delapan Ratus Tujuh Puluh Juta Empat Ratus Lima Puluh Sembilan Ribu
Terbilang :
Rupiah
ENDANG RISKINA
Direktur