ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR
SUMMARY
1 PEKERJAAN PONDASI
2 PEKERJAAN TANAH
3 PEKERJAAN BETON
4 PEKERJAAN BAJA
6 PEKERJAAN ATAP
( EE - SUMMARY ) Hal. 1
GEDUNG TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR
( EE - SUMMARY ) Hal. 2
GERI MALANG
SUMMARY
HARGA TOTAL
SATUAN HARGA
Rp. Rp.
8,801,514,480.00
471,806,088.62
35,787,698,323.06
7,208,052,444.00
650,611,815.00
1,007,957,700.00
PPN 10%
TOTAL 53,927,640,850.69
ROUNDED 53,927,640,000.00
( EE - SUMMARY ) Hal. 3
GERI MALANG
SUMMARY
HARGA TOTAL
SATUAN HARGA
Rp. Rp.
( EE - SUMMARY ) Hal. 4
GEDUNG TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR
SUMMARY
PEKERJAAN PONDASI
Halaman 2
PEKERJAAN PONDASI
B Upah Pemancangan m1
TOTAL dikoleks
8,801,514,480.00
TOTAL 8,801,514,480.00
SUMMARY
PEKERJAAN TANAH
Halaman 2
PEKERJAAN TANAH
Biaya juga termasuk atas penggalian untuk ruang gerak kerja yang
dibutuhkan,ukuran galian didasarkan pada tanah padat, kecuali disebutkan
semua galiandi ukur dari bentuk yang ada.
Semua galian dihitung termasuk pembongkaran atas beton lama, jalan dan
materialdidalam tanah yang tak terduga sebelumnya.
Pekerjaan tanah
A Pekerjaan galian tanah termasuk urugan kembali dan buang tanah m3 883.44
sisa galian, untuk Pile cap
C Pekerjaan urugan tanah ( import material ), untuk bawah plat lantaim3 2,331.56
dasar
D Pekerjaan pasir urug tebal 10 cm, untuk di bawah pile cap m2 909.60
G Pekerjaan lantai kerja tebal 5 cm, untuk di bawah pile cap m2 606.40
TOTAL dikoleksika
471,806,088.62
TOTAL 471,806,088.62
SUMMARY
PEKERJAAN BETON
Halaman 2
Halaman 3
Halaman 4
Halaman 5
( EE - PEK.BETON ) Hal. 21
GEDUNG TEKNIK SIPIL POLITEKNIK NEGE
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR
( EE - PEK.BETON ) Hal. 22
GEDUNG TEKNIK SIPIL POLITEKNIK NEGE
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR
PEKERJAAN BETON
Berat besi beton telah ditetapkan dengan menggunakan berat nominal, berikut ini
daftar nilai untuk semua berat besi beton.
Lantai dasar
A Pile cap m3
B Tie beam m3
D Kolom m3
E Shear wall m3
( EE - PEK.BETON ) Hal. 23
GEDUNG TEKNIK SIPIL POLITEKNIK NEGE
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR
Lantai 2
G Balok lantai 2 m3
H Plat lantai 2 m3
I Kolom lantai 2 m3
( EE - PEK.BETON ) Hal. 24
GEDUNG TEKNIK SIPIL POLITEKNIK NEGE
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR
PEKERJAAN BETON
Lantai 3
L Balok lantai 3 m3
M Plat lantai 3 m3
N Kolom lantai 3 m3
Lantai 4
Q Balok lantai 4 m3
R Plat lantai 4 m3
S Kolom lantai 4 m3
Lantai 5
V Balok lantai 5 m3
W Plat lantai 5 m3
X Kolom lantai 5 m3
Lantai 6
A Balok lantai 6 m3
( EE - PEK.BETON ) Hal. 25
GEDUNG TEKNIK SIPIL POLITEKNIK NEGE
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR
B Plat lantai 6 m3
C Kolom lantai 6 m3
Lantai 7
F Balok lantai 7 m3
G Plat lantai 7 m3
H Kolom lantai 7 m3
Lantai 8
K Balok lantai 8 m3
L Plat lantai 8 m3
M Kolom lantai 8 m3
( EE - PEK.BETON ) Hal. 26
GEDUNG TEKNIK SIPIL POLITEKNIK NEGE
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR
Lantai atap
Core Lift
R Pit Lift m3
Form work
Lantai dasar
L Pile cap m2
M Tie beam m2
O Kolom m2
P Shear wall m2
( EE - PEK.BETON ) Hal. 27
GEDUNG TEKNIK SIPIL POLITEKNIK NEGE
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR
( EE - PEK.BETON ) Hal. 28
GEDUNG TEKNIK SIPIL POLITEKNIK NEGE
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR
PEKERJAAN BETON
Form work
Lantai 2
A Balok lantai 2 m2
B Plat lantai 2 m2
C Kolom lantai 2 m2
Lantai 3
F Balok lantai 3 m2
G Plat lantai 3 m2
H Kolom lantai 3 m2
Lantai 4
K Balok lantai 4 m2
L Plat lantai 4 m2
M Kolom lantai 4 m2
Lantai 5
V Balok lantai 5 m2
( EE - PEK.BETON ) Hal. 29
GEDUNG TEKNIK SIPIL POLITEKNIK NEGE
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR
W Plat lantai 5 m2
X Kolom lantai 5 m2
Lantai 6
A Balok lantai 6 m2
B Plat lantai 6 m2
C Kolom lantai 6 m2
Lantai 7
F Balok lantai 7 m2
G Plat lantai 7 m2
H Kolom lantai 7 m2
( EE - PEK.BETON ) Hal. 30
GEDUNG TEKNIK SIPIL POLITEKNIK NEGE
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR
Lantai 8
K Balok lantai 8 m2
L Plat lantai 8 m2
M Kolom lantai 8 m2
Core Lift
R Pit Lift m2
Lantai atap
Reinforced bars
Lantai dasar
Q Pile cap
( EE - PEK.BETON ) Hal. 31
GEDUNG TEKNIK SIPIL POLITEKNIK NEGE
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR
- PC 1 kg
- PC 2
- PC 3
- PC 4
- PC 5
- PC 8
- PC 9
- PC 12
- PC 12 A
R Tie beam kg
( EE - PEK.BETON ) Hal. 32
GEDUNG TEKNIK SIPIL POLITEKNIK NEGE
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR
PEKERJAAN BETON
Reinforced bars
Lantai dasar
B Kolom kg
C Shear wall kg
Lantai 2
E Balok lantai 2 kg
F Plat lantai 2 kg
G Kolom lantai 2 kg
Lantai 3
J Balok lantai 3 kg
K Plat lantai 3 kg
L Kolom lantai 3 kg
Lantai 4
O Balok lantai 4 kg
P Plat lantai 4 kg
( EE - PEK.BETON ) Hal. 33
GEDUNG TEKNIK SIPIL POLITEKNIK NEGE
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR
Q Kolom lantai 4 kg
Lantai 5
V Balok lantai 5 kg
W Plat lantai 5 kg
X Kolom lantai 5 kg
Lantai 6
A Balok lantai 6 kg
B Plat lantai 6 kg
C Kolom lantai 6 kg
( EE - PEK.BETON ) Hal. 34
GEDUNG TEKNIK SIPIL POLITEKNIK NEGE
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR
Lantai 7
F Balok lantai 7 kg
G Plat lantai 7 kg
H Kolom lantai 7 kg
Lantai 8
K Balok lantai 8 kg
L Plat lantai 8 kg
M Kolom lantai 8 kg
Core Lift
R Pit Lift kg
( EE - PEK.BETON ) Hal. 35
GEDUNG TEKNIK SIPIL POLITEKNIK NEGE
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR
Lantai atap
( EE - PEK.BETON ) Hal. 36
G TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR
HARGA
QT' Y SATUAN
Rp.
SUB TOTAL
PPN 10%
TOTAL
( EE - PEK.BETON ) Hal. 37
G TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR
HARGA
QT' Y SATUAN
Rp.
( EE - PEK.BETON ) Hal. 38
G TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR
HARGA
QT' Y SATUAN
Rp.
( EE - PEK.BETON ) Hal. 39
G TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR
HARGA
QT' Y SATUAN
Rp.
( EE - PEK.BETON ) Hal. 40
G TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR
HARGA
QT' Y SATUAN
Rp.
( EE - PEK.BETON ) Hal. 41
G TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR
HARGA
QT' Y SATUAN
Rp.
237.58 945,835.00 159.98
( EE - PEK.BETON ) Hal. 42
G TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR
HARGA
QT' Y SATUAN
Rp.
( EE - PEK.BETON ) Hal. 43
G TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR
HARGA
QT' Y SATUAN
Rp.
( EE - PEK.BETON ) Hal. 44
G TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR
HARGA
QT' Y SATUAN
Rp.
( EE - PEK.BETON ) Hal. 45
G TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR
HARGA
QT' Y SATUAN
Rp.
1,751.80 227,433.33 1,230.63
( EE - PEK.BETON ) Hal. 46
G TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR
HARGA
QT' Y SATUAN
Rp.
( EE - PEK.BETON ) Hal. 47
G TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR
HARGA
QT' Y SATUAN
Rp.
2,352.990 12,697.75 48,008.36
16,047.850 12,697.75
3,218.650 12,697.75
25,730.050 12,697.75
4,500.160 12,697.75
3,895.570 12,697.75
15,022.930 12,697.75
31,249.710 12,697.75
10,121.950 12,697.75
( EE - PEK.BETON ) Hal. 48
G TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR
HARGA
QT' Y SATUAN
Rp.
( EE - PEK.BETON ) Hal. 49
G TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR
HARGA
QT' Y SATUAN
Rp.
43,260.39 12,697.75 36,531.79
( EE - PEK.BETON ) Hal. 50
G TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR
HARGA
QT' Y SATUAN
Rp.
( EE - PEK.BETON ) Hal. 51
G TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR
HARGA
QT' Y SATUAN
Rp.
( EE - PEK.BETON ) Hal. 52
PEKERJAAN BETON
TOTAL
HARGA
Rp.
2,301,596,544.21
4,125,699,562.57
9,625,720,503.37
19,734,681,712.91
35,787,698,323.06
Exlude
35,787,698,323.06
( EE - PEK.BETON ) Hal. 53
PEKERJAAN BETON
TOTAL
HARGA
Rp.
( EE - PEK.BETON ) Hal. 54
PEKERJAAN BETON
TOTAL
HARGA
Rp.
510,684,076.76
339,679,615.22
840,753,299.00
154,993,508.53
24,828,168.75
( EE - PEK.BETON ) Hal. 55
PEKERJAAN BETON
TOTAL
HARGA
Rp.
40,398,504.52
111,501,083.14
121,394,517.24
111,409,431.73
24,828,168.75
21,126,170.56
2,301,596,544.21
( EE - PEK.BETON ) Hal. 56
PEKERJAAN BETON
TOTAL
HARGA
Rp.
170,480,421.66
224,714,316.81
89,127,545.39
19,862,535.00
19,465,284.30
170,480,421.66
224,714,316.81
78,427,314.03
18,538,366.00
19,465,284.30
170,480,421.66
224,714,316.81
78,427,314.03
18,538,366.00
19,465,284.30
170,480,421.66
( EE - PEK.BETON ) Hal. 57
PEKERJAAN BETON
TOTAL
HARGA
Rp.
224,714,316.81
78,427,314.03
18,538,366.00
19,465,284.30
170,480,421.66
224,714,316.81
72,843,860.86
18,538,366.00
19,465,284.30
170,480,421.66
224,714,316.81
72,843,860.86
18,538,366.00
19,465,284.30
( EE - PEK.BETON ) Hal. 58
PEKERJAAN BETON
TOTAL
HARGA
Rp.
168,912,700.14
224,714,316.81
4,615,674.80
11,633,770.50
11,633,770.50
7,945,014.00
7,945,014.00
7,945,014.00
7,945,014.00
7,945,014.00
7,945,014.00
107,740,197.63
133,117,686.00
45,175,162.50
188,615,012.00
33,546,416.67
77,713,060.27
( EE - PEK.BETON ) Hal. 59
PEKERJAAN BETON
TOTAL
HARGA
Rp.
4,125,699,562.57
( EE - PEK.BETON ) Hal. 60
PEKERJAAN BETON
TOTAL
HARGA
Rp.
183,208,011.93
224,540,381.33
136,214,372.00
33,546,416.67
40,639,607.47
282,452,868.17
398,417,713.33
108,971,497.60
26,837,133.33
37,444,624.00
282,452,868.17
398,417,713.33
101,959,273.07
26,746,160.00
37,444,624.00
282,452,868.17
( EE - PEK.BETON ) Hal. 61
PEKERJAAN BETON
TOTAL
HARGA
Rp.
398,417,713.33
101,959,273.07
26,746,160.00
37,444,624.00
282,452,868.17
398,417,713.33
101,959,273.07
26,746,160.00
37,444,624.00
282,452,868.17
398,417,713.33
99,102,710.40
26,746,160.00
37,444,624.00
( EE - PEK.BETON ) Hal. 62
PEKERJAAN BETON
TOTAL
HARGA
Rp.
282,452,868.17
398,417,713.33
99,102,710.40
26,746,160.00
37,444,624.00
2,219,749.33
5,594,860.00
5,594,860.00
3,820,880.00
3,820,880.00
3,820,880.00
3,820,880.00
3,820,880.00
3,820,880.00
278,387,497.33
398,417,713.33
( EE - PEK.BETON ) Hal. 63
PEKERJAAN BETON
TOTAL
HARGA
Rp.
29,877,678.77
203,771,587.34
40,869,613.04
326,713,742.39
57,141,906.64
49,464,973.97
190,757,409.41
396,801,005.15
128,525,990.61
1,786,993,942.72
9,625,720,503.37
( EE - PEK.BETON ) Hal. 64
PEKERJAAN BETON
TOTAL
HARGA
Rp.
1,691,658,221.31
954,821,739.80
102,918,800.43
395,944,115.90
533,553,485.49
323,158,053.14
781,253,964.78
98,874,871.84
101,100,691.23
840,076,737.24
573,401,950.29
625,003,171.82
79,099,897.47
125,328,529.30
840,076,737.24
568,467,577.42
( EE - PEK.BETON ) Hal. 65
PEKERJAAN BETON
TOTAL
HARGA
Rp.
549,309,598.94
73,826,570.97
125,328,529.30
840,076,737.24
568,467,577.42
549,309,598.94
73,826,570.97
125,328,529.30
840,076,737.24
568,467,577.42
549,309,598.94
73,826,570.97
125,328,529.30
( EE - PEK.BETON ) Hal. 66
PEKERJAAN BETON
TOTAL
HARGA
Rp.
840,076,737.24
568,467,577.42
511,316,276.64
73,826,570.97
125,328,529.30
840,076,737.24
568,467,577.42
511,316,276.64
73,826,570.97
125,328,529.30
24,254,706.85
61,133,789.81
61,133,789.81
41,749,905.24
41,749,905.24
41,749,905.24
41,749,905.24
41,749,905.24
41,749,905.24
( EE - PEK.BETON ) Hal. 67
PEKERJAAN BETON
TOTAL
HARGA
Rp.
829,005,389.91
573,401,950.29
19,734,681,712.91
( EE - PEK.BETON ) Hal. 68
GEDUNG TEKNIK SIPIL POLITEKNIK NEGERI M
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR
SUMMARY
PEKERJAAN BAJA
Halaman 2
PEKERJAAN BAJA
Pekerjaan Baja sudah termasuk setting out untuk perletakan struktur baja
I WF 200.100.5,5.8 kg 639.90
J Plat t : 10 mm kg 44.15
K Dynabolt M 16 bh 120.00
L Grouting ttk 30.00
TOTAL dikole
7,208,052,444.00
TOTAL 7,208,052,444.00
22,800.00 1,786,177,536.00
22,800.00 2,064,541,368.00
22,800.00 787,597,956.00
22,800.00 42,856,704.00
22,800.00 25,056,972.00
22,800.00 2,399,165,568.00
165,000.00 63,360,000.00
50,000.00 2,400,000.00
22,800.00 14,589,720.00
22,800.00 1,006,620.00
165,000.00 19,800,000.00
50,000.00 1,500,000.00
SUMMARY
PEKERJAAN LAIN LAIN
Halaman 2
650,611,815.00
TOTAL 650,611,815.00
105,000.00 466,672,815.00
105,000.00 183,939,000.00
SUMMARY
PEKERJAAN PASANGAN ATAP
Halaman 2
( BQ_PEK.ATAP ) Hal. 85
GEDUNG TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR
( BQ_PEK.ATAP ) Hal. 86
GEDUNG TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR
Pekerjaan pemasangan atap ( lapisan pembungkus), harus sesuai dengan instruksi dari pabrik.
Harga sudah termasuk perlengkapan pendukung pekerjaan dan sesuai dengan spesifikasi teknis.
Pekerjaan atap
( BQ_PEK.ATAP ) Hal. 87
GEDUNG TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR
( BQ_PEK.ATAP ) Hal. 88
ERI MALANG
PEKERJAAN ATAP
HARGA TOTAL
SATUAN HARGA
Rp. Rp.
1,007,957,700.00
TOTAL 1,007,957,700.00
( BQ_PEK.ATAP ) Hal. 89
ERI MALANG
PEKERJAAN ATAP
HARGA TOTAL
SATUAN HARGA
Rp. Rp.
( BQ_PEK.ATAP ) Hal. 90
ERI MALANG
PEKERJAAN ATAP
HARGA TOTAL
SATUAN HARGA
Rp. Rp.
300,000.00 980,395,200.00
300,000.00 27,562,500.00
( BQ_PEK.ATAP ) Hal. 91
ERI MALANG
PEKERJAAN ATAP
HARGA TOTAL
SATUAN HARGA
Rp. Rp.
( BQ_PEK.ATAP ) Hal. 92
ANALISA HARGA SATUAN PEKERJAAN
PROYEK POLITEKNIK NEGRI, MALANG
PASIRB URUG / m3
Pasir urug m3 1.00 95,000.00 95,000.00
Waste 20% m3 0.20 95,000.00 19,000.00
Alat bantu ls 1.00 1,000.00 1,000.00
Pekerja md 0.11 35,000.00 = 3,750.00
Tukang md 0.07 45,000.00 = 3,214.29
Kepala tukang md 0.04 55,000.00 = 1,964.29
Mandor md 0.01 70,000.00 = 833.33
SUB TOTAL = 124,761.90
Jasa & Keuntungan 10% =
TOTAL = 124,761.90
Rounded = 124,700.00
tebal 10 cm 18,705.00
LANTAI KERJA / m3
Concrete B0 m3 1.00 525,000.00 = 525,000.00
Waste 5 % m3 0.05 525,000.00 = 26,250.00
Alat & bahan bantu ls 1.00 50,000.00 = 50,000.00
Pekerja md 0.47 35,000.00 = 16,450.00
Tukang md 0.15 45,000.00 = 6,750.00
Kepala tukang md 0.02 55,000.00 = 825.00
Mandor md 0.00 70,000.00 = 105.00
SUB TOTAL = 625,380.00
Jasa & Keuntungan 10% =
TOTAL = 625,380.00
Rounded = 625,300.00
tebal 5 cm 31,265.00
BETON FC' 35 Mpa / m3
Concrete Fc' 35 Mpa m3 1.00 600,000.00 = 600,000.00
Waste 5 % m3 0.05 600,000.00 = 30,000.00
Alat & bahan bantu ls 1.00 50,000.00 = 50,000.00
Pekerja md 0.47 35,000.00 = 16,450.00
Tukang md 0.15 45,000.00 = 6,750.00
Kepala tukang md 0.02 55,000.00 = 825.00
Mandor md 0.00 70,000.00 = 105.00
SUB TOTAL = 704,130.00
Jasa & Keuntungan 10% =
TOTAL = 704,130.00
Rounded = 704,100.00
BESI BETON / kg
Besi beton kg 1.00 7,250.00 = 7,250.00
Waste 5% kg 0.05 7,250.00 = 362.50
Kawat bendrad kg 0.00 15,000.00 = 15.00
Alat & bahan bantu ls 1.00 - = -
Pekerja md 0.01 35,000.00 = 210.00
Tukang md 0.01 45,000.00 = 270.00
Kepala tukang md 0.00 55,000.00 = 27.50
Mandor md 0.00 70,000.00 = 14.00
SUB TOTAL = 8,149.00
Jasa & Keuntungan 10% =
TOTAL = 8,149.00
Rounded = 7,885.00
BEKESTING KAYU / m2
Plywood t 18 mm m2 12.50 135,000.00 = 1,687,500.00
Balok kayu 5 x 7 cm m3 0.22 2,000,000.00 = 440,000.00
Balok kayu 6 x 12 cm m3 0.30 2,150,000.00 = 645,000.00
Jack base bh 14.38 5,000.00 = 71,900.00
Main frame bh 6.94 7,000.00 = 48,580.00
Joint pin bh 14.38 1,100.00 = 15,818.00
Cross barce bh 25.78 5,000.00 = 128,900.00
U Head bh 14.38 5,000.00 = 71,900.00
Paku kg 0.23 15,000.00 = 3,450.00
Minyak bekesting kg 0.20 10,000.00 = 2,000.00
Bahan bantu ls 1.00 100,000.00 = 100,000.00
SUB TOTAL = 3,215,048.00
per m2 = 257,203.84
1 x pakai = 85,734.61
Pekerja md 0.01 35,000.00 = 224.00
Tukang md 0.01 45,000.00 = 279.00
Kepala tukang md 0.00 55,000.00 = 33.00
Mandor md 0.00 70,000.00 = 21.00
SUB TOTAL = 86,291.61
Jasa & Keuntungan 10% =
TOTAL = 86,291.61
Rounded = 86,200.00
STRUKTUR BAJA / kg
Row material ( WF, INP etc ) kg 1.00 16,900.00 = 16,900.00
Waste 2,5% kg 0.00 16,900.00 = 42.25
Alat & bahan bantu ls 1.00 1,500.00 = 1,500.00
Pekerja ( fabrikasi ) md 0.02 45,000.00 = 900.00
Tukang ( fabrikasi ) md 0.02 60,000.00 = 1,020.00
Kepala tukang ( fabrikasi ) md 0.00 70,000.00 = 280.00
Mandor ( fabrikasi ) md 0.00 80,000.00 = 48.00
Tranportasi ls 1.00 500.00 = 500.00
Pekerja ( fabrikasi ) md 0.01 45,000.00 = 450.00
Tukang ( fabrikasi ) md 0.01 60,000.00 = 600.00
Kepala tukang ( fabrikasi ) md 0.00 70,000.00 = 70.00
Mandor ( fabrikasi ) md 0.00 80,000.00 = 8.00
Alat bantu ls 1.00 500.00 = 500.00
SUB TOTAL = 22,818.25
Jasa & Keuntungan 10% =
TOTAL = 22,818.25
Rounded = 22,800.00
DAFTAR HARGA BAHAN DAN UPAH KERJA
Pekerjaan : Belanja Modal Gedung dan Bangunan berupa Pembangunan Gedung Teknik Sipil
Politeknik Negeri Malang
Lokasi : Jl. Sukarno-Hatta, Malang
Harga
215,000.00
165,000.00
650.00
2,200.00
14,200.00
9,935.00
9,935.00
16,900.00
16,900.00
16,900.00
16,900.00
16,900.00
16,900.00
19,600.00
22,500.00
23,000.00
5,000,000.00
4,750,000.00
5,500,000.00
27,500.00
185,000.00
23,000.00
110,000.00
180,000.00
1,290.00
60,000.00
125,000.00
425,000.00
60,000.00
200,000.00
350,000.00
Harga
80,000.00
70,000.00
60,000.00
60,000.00
60,000.00
45,000.00
80,000.00
RENCANA ANGGARAN BIAYA
Pekerjaan : Belanja Modal Gedung dan Bangunan berupa Pembangunan Gedung Teknik Sipil
Politeknik Negeri Malang
Lokasi : Jl. Sukarno-Hatta, Malang
6 Beton Non Struktur 1Pc : 3Ps : 5Kr - untuk rabatan/ beton tumbuk tiap 1m³
Harga bahan:
- Semen portland kg 218.000 1,290.00 281,220.00
- Pasir beton m³ 0.520 185,000.00 96,200.00
- Batu pecah/split 2/3 m³ 0.870 215,000.00 187,050.00
Jumlah Harga Bahan
Upah tenaga:
- Pekerja Oh 1.650 45,000.00 74,250.00
- Tukang batu Oh 0.250 60,000.00 15,000.00
- Kepala tukang Oh 0.025 70,000.00 1,750.00
- Mandor Oh 0.080 80,000.00 6,400.00
- Alat bantu ls 1.000 15,000.00 15,000.00
Jumlah Upah Tenaga
Jumlah Total
Jumlah
1,645,600,000.00
1,645,600,000.00
298,115.94
298,115.94
200,000,000.00
200,000,000.00
100,000,000.00
100,000,000.00
10,836.75
1,816.00
12,652.75
12,652.75
10,881.75
1,816.00
12,697.75
12,697.75
132,000.00
16,300.00
148,300.00
148,300.00
564,470.00
112,400.00
676,870.00
676,870.00
734,885.00
1.250
918,606.25
141,450.00
1,060,056.25
1,060,056.25
804,385.00
141,450.00
945,835.00
945,835.00
56,030.00
36,400.00
92,430.00
92,430.00
488,950.00
162,983.33
64,450.00
227,433.33
227,433.33
828,000.00
828,000.00
46,000.00
46,000.00
160,000.00
23,920.00
183,920.00
183,920.00
4,825,360.00
48,253.60
48,253.60