Anda di halaman 1dari 107

GEDUNG TEKNIK SIPIL POLITEKNIK NEGERI MALANG

ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

No. URAIAN PEKERJAAN UNIT QT' Y

PROYEK POLITEKNIK NEGERI MALANG


BANGUNAN RUANG KULIAH TEKNIK SIPIL

SUMMARY

1 PEKERJAAN PONDASI

2 PEKERJAAN TANAH

3 PEKERJAAN BETON

4 PEKERJAAN BAJA

5 PEKERJAAN LAIN LAIN

6 PEKERJAAN ATAP

( EE - SUMMARY ) Hal. 1
GEDUNG TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

No. URAIAN PEKERJAAN UNIT QT' Y

( EE - SUMMARY ) Hal. 2
GERI MALANG

SUMMARY
HARGA TOTAL
SATUAN HARGA
Rp. Rp.

8,801,514,480.00

471,806,088.62

35,787,698,323.06

7,208,052,444.00

650,611,815.00

1,007,957,700.00

SUB TOTAL 53,927,640,850.69

PPN 10%

TOTAL 53,927,640,850.69

ROUNDED 53,927,640,000.00

( EE - SUMMARY ) Hal. 3
GERI MALANG

SUMMARY
HARGA TOTAL
SATUAN HARGA
Rp. Rp.

( EE - SUMMARY ) Hal. 4
GEDUNG TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

No. URAIAN PEKERJAAN UNIT

PROYEK POLITEKNIK NEGERI MALANG


BANGUNAN RUANG KULIAH TEKNIK SIPIL

SUMMARY
PEKERJAAN PONDASI

Halaman 2

( EE - PEK. PONDASI ) Hal. 5


GEDUNG TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

No. URAIAN PEKERJAAN UNIT

( EE - PEK. PONDASI ) Hal. 6


GEDUNG TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

No. URAIAN PEKERJAAN UNIT

PEKERJAAN PONDASI

Harga sudah termasuk setting out untuk perletakan pondasi

Harga satuan sudah termasuk biaya penyambungan dan perlindungan

Pekerjaan harus sesuai gambar dan spesifikasi teknis

Termasuk kebersihan dan kerapihan

Pekerjaan Tiang Pancang 45 X 45 cm, L : 17 mtr

A Pengadaan Tiang pancang 45 X 45 cm 388 batang m1

B Upah Pemancangan m1

C Pekerjaan Load test ttk

D Pekerjaan PDA test ttk

E Tiang Pancang ttk

( EE - PEK. PONDASI ) Hal. 7


GEDUNG TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

No. URAIAN PEKERJAAN UNIT

TOTAL dikoleks

( EE - PEK. PONDASI ) Hal. 8


NIK NEGERI MALANG
TIMATE
UKTUR
PEKERJAAN PONDASI
HARGA TOTAL
QT' Y SATUAN HARGA
Rp. Rp.

8,801,514,480.00

SUB TOTAL 8,801,514,480.00

PPN 10% Exclude

TOTAL 8,801,514,480.00

( EE - PEK. PONDASI ) Hal. 9


NIK NEGERI MALANG
TIMATE
UKTUR
PEKERJAAN PONDASI
HARGA TOTAL
QT' Y SATUAN HARGA
Rp. Rp.

( EE - PEK. PONDASI ) Hal. 10


NIK NEGERI MALANG
TIMATE
UKTUR
PEKERJAAN PONDASI
HARGA TOTAL
QT' Y SATUAN HARGA
Rp. Rp.

6,256.00 1,182,705.00 7,399,002,480.00

6,256.00 189,500.00 1,185,512,000.00

1.00 100,000,000.00 100,000,000.00

1.00 25,000,000.00 25,000,000.00

368.00 250,000.00 92,000,000.00

( EE - PEK. PONDASI ) Hal. 11


NIK NEGERI MALANG
TIMATE
UKTUR
PEKERJAAN PONDASI
HARGA TOTAL
QT' Y SATUAN HARGA
Rp. Rp.

TOTAL dikoleksikan ke Summary 8,801,514,480.00

( EE - PEK. PONDASI ) Hal. 12


GEDUNG TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

No. URAIAN PEKERJAAN UNIT QT' Y

PROYEK POLITEKNIK NEGERI MALANG


BANGUNAN RUANG KULIAH TEKNIK SIPIL

SUMMARY
PEKERJAAN TANAH

Halaman 2

(EE - PEK. TANAH ) Hal. 13


GEDUNG TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

No. URAIAN PEKERJAAN UNIT QT' Y

(EE - PEK. TANAH ) Hal. 14


GEDUNG TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

No. URAIAN PEKERJAAN UNIT QT' Y

PEKERJAAN TANAH

Kecuali disebutkan lain, harga penggalian termasuk papan bouwplank,


turapanpenahan tanah, perataan, pemadatan dan pembuangan sisa-sisa galian,
sertamenjaga tetap kering dan bebas dari air

Biaya juga termasuk atas penggalian untuk ruang gerak kerja yang
dibutuhkan,ukuran galian didasarkan pada tanah padat, kecuali disebutkan
semua galiandi ukur dari bentuk yang ada.

Semua galian dihitung termasuk pembongkaran atas beton lama, jalan dan
materialdidalam tanah yang tak terduga sebelumnya.

Pekerjaan harus sesuai gambar dan spesifikasi teknis

Termasuk kebersihan dan kerapihan

Pekerjaan tanah

A Pekerjaan galian tanah termasuk urugan kembali dan buang tanah m3 883.44
sisa galian, untuk Pile cap

B Ditto, untuk Tie beam m3 359.13

C Pekerjaan urugan tanah ( import material ), untuk bawah plat lantaim3 2,331.56
dasar

D Pekerjaan pasir urug tebal 10 cm, untuk di bawah pile cap m2 909.60

E Ditto, untuk di bawah tie beam m2 369.77

F Ditto, untuk di bawah plat lantai dasar m2 3,885.93

G Pekerjaan lantai kerja tebal 5 cm, untuk di bawah pile cap m2 606.40

H Ditto, untuk di bawah tie beam m2 246.51

I Ditto, untuk di bawah plat lantai dasar m2 3,885.93

(EE - PEK. TANAH ) Hal. 15


GEDUNG TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

No. URAIAN PEKERJAAN UNIT QT' Y

TOTAL dikoleksika

(EE - PEK. TANAH ) Hal. 16


K NEGERI MALANG
MATE
TUR
PEKERJAAN TANAH
HARGA TOTAL
SATUAN HARGA
Rp. Rp.

471,806,088.62

SUB TOTAL 471,806,088.62

PPN 10% Exclude

TOTAL 471,806,088.62

(EE - PEK. TANAH ) Hal. 17


K NEGERI MALANG
MATE
TUR
PEKERJAAN TANAH
HARGA TOTAL
SATUAN HARGA
Rp. Rp.

(EE - PEK. TANAH ) Hal. 18


K NEGERI MALANG
MATE
TUR
PEKERJAAN TANAH
HARGA TOTAL
SATUAN HARGA
Rp. Rp.

883.44 48,253.60 42,628,979.43

359.13 48,253.60 17,329,411.88

2,331.56 75,000.00 174,866,985.00

909.60 14,830.00 13,489,423.61

369.77 14,830.00 5,483,682.25

3,885.93 14,830.00 57,628,386.39

606.40 33,843.50 20,522,783.01

246.51 33,843.50 8,342,863.57

3,885.93 33,843.50 131,513,573.49

(EE - PEK. TANAH ) Hal. 19


K NEGERI MALANG
MATE
TUR
PEKERJAAN TANAH
HARGA TOTAL
SATUAN HARGA
Rp. Rp.

TOTAL dikoleksikan ke Summary 471,806,088.62

(EE - PEK. TANAH ) Hal. 20


GEDUNG TEKNIK SIPIL POLITEKNIK NEGE
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

No. URAIAN PEKERJAAN UNIT

PROYEK POLITEKNIK NEGERI MALANG


BANGUNAN RUANG KULIAH TEKNIK SIPIL

SUMMARY
PEKERJAAN BETON

Halaman 2

Halaman 3

Halaman 4

Halaman 5

( EE - PEK.BETON ) Hal. 21
GEDUNG TEKNIK SIPIL POLITEKNIK NEGE
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

No. URAIAN PEKERJAAN UNIT

( EE - PEK.BETON ) Hal. 22
GEDUNG TEKNIK SIPIL POLITEKNIK NEGE
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

No. URAIAN PEKERJAAN UNIT

PEKERJAAN BETON

Harga untuk pekerjaan beton termasuk pembuatan marking, perapihan,


pembuatan sparing,pembersihan, penutupan kembali lubang-lubang bekas baut
pipa dan juga perawatan (curing), perlindungannya, membentuk construction
joint dan pembongkaran cetakan.
Biaya pelaksanaan juga termasuk pemotongan ujung kait, penekukan kawat
pengikat dan overlaping penyambungan besi beton.

Berat besi beton telah ditetapkan dengan menggunakan berat nominal, berikut ini
daftar nilai untuk semua berat besi beton.

Dia. 6 mm = 0.220 Kg per meter


Dia. 8 mm = 0.393 Kg per meter
Dia. 10 mm = 0.620 Kg per meter
Dia. 12 mm = 0.870 Kg per meter
Dia. 13 mm = 1.040 Kg per meter
Dia. 16 mm = 1.560 Kg per meter
Dia. 19 mm = 2.250 Kg per meter
Dia. 22 mm = 3.040 Kg per meter
Dia. 25 mm = 3.980 Kg per meter
Dia. 32 mm = 6.230 Kg per meter

Harga untuk pekerjaan cetakan termasuk pengisian sudut-sudut, sisi-sisi miring,


pembuatan takik, penopang, pembautan, baji / pemakuan, peringanan,
penguatan, pemindahan dan pemotongan pipa, baut dan lain sebagainya yang
berhubungan dengan pekerjaan ini.
Pekerjaan harus sesuai gambar dan spesifikasi teknis

Termasuk kebersihan dan kerapihan

Pekerjaan beton Fc' 30 Mpa, untuk

Lantai dasar

A Pile cap m3

B Tie beam m3

C Plat lantai dasar m3

D Kolom m3

E Shear wall m3

( EE - PEK.BETON ) Hal. 23
GEDUNG TEKNIK SIPIL POLITEKNIK NEGE
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

No. URAIAN PEKERJAAN UNIT

F Tangga ( lantai dasar ke lantai 2 ) m3

Lantai 2

G Balok lantai 2 m3

H Plat lantai 2 m3

I Kolom lantai 2 m3

J Shear wall lantai 2 m3

K Tangga ( lantai 2 ke lantai 3 ) m3

( EE - PEK.BETON ) Hal. 24
GEDUNG TEKNIK SIPIL POLITEKNIK NEGE
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

No. URAIAN PEKERJAAN UNIT

PEKERJAAN BETON

Pekerjaan beton Fc' 30 Mpa, untuk

Lantai 3

L Balok lantai 3 m3

M Plat lantai 3 m3

N Kolom lantai 3 m3

O Shear wall lantai 3 m3

P Tangga ( lantai 3 ke lantai 4 ) m3

Lantai 4

Q Balok lantai 4 m3

R Plat lantai 4 m3

S Kolom lantai 4 m3

T Shear wall lantai 4 m3

U Tangga ( lantai 4 ke lantai 5 ) m3

Lantai 5

V Balok lantai 5 m3

W Plat lantai 5 m3

X Kolom lantai 5 m3

Y Shear wall lantai 5 m3

Z Tangga ( lantai 5 ke lantai 6 ) m3

Lantai 6

A Balok lantai 6 m3

( EE - PEK.BETON ) Hal. 25
GEDUNG TEKNIK SIPIL POLITEKNIK NEGE
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

No. URAIAN PEKERJAAN UNIT

B Plat lantai 6 m3

C Kolom lantai 6 m3

D Shear wall lantai 6 m3

E Tangga ( lantai 6 ke lantai 7 ) m3

Lantai 7

F Balok lantai 7 m3

G Plat lantai 7 m3

H Kolom lantai 7 m3

I Shear wall lantai 7 m3

J Tangga ( lantai 7 ke lantai 8 ) m3

Lantai 8

K Balok lantai 8 m3

L Plat lantai 8 m3

M Kolom lantai 8 m3

N Shear wall lantai 8 m3

O Tangga ( lantai 8 ke lantai Atap ) m3

( EE - PEK.BETON ) Hal. 26
GEDUNG TEKNIK SIPIL POLITEKNIK NEGE
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

No. URAIAN PEKERJAAN UNIT

Lantai atap

P Balok lantai Atap m3

Q Plat lantai Atap m3

Core Lift

R Pit Lift m3

S Core lift Lt. Dasar ke Lt. 2 m3

T Core lift Lt. 2 ke Lt. 3 m3

U Core lift Lt. 3 ke Lt. 4 m3

V Core lift Lt. 4 ke Lt. 5 m3

W Core lift Lt. 5 ke Lt. 6 m3

X Core lift Lt. 6 ke Lt. 7 m3

Y Core lift Lt. 7 ke Lt. 8 m3

Z Core lift Lt. 7 ke Lt. 8 m3

Form work

Lantai dasar

L Pile cap m2

M Tie beam m2

N Plat lantai dasar m2

O Kolom m2

P Shear wall m2

Q Tangga ( lantai dasar ke lantai 2 ) m2

( EE - PEK.BETON ) Hal. 27
GEDUNG TEKNIK SIPIL POLITEKNIK NEGE
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

No. URAIAN PEKERJAAN UNIT

( EE - PEK.BETON ) Hal. 28
GEDUNG TEKNIK SIPIL POLITEKNIK NEGE
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

No. URAIAN PEKERJAAN UNIT

PEKERJAAN BETON

Form work

Lantai 2

A Balok lantai 2 m2

B Plat lantai 2 m2

C Kolom lantai 2 m2

D Shear wall lantai 2 m2

E Tangga ( lantai 2 ke lantai 3 ) m2

Lantai 3

F Balok lantai 3 m2

G Plat lantai 3 m2

H Kolom lantai 3 m2

I Shear wall lantai 3 m2

J Tangga ( lantai 3 ke lantai 4 ) m2

Lantai 4

K Balok lantai 4 m2

L Plat lantai 4 m2

M Kolom lantai 4 m2

N Shear wall lantai 4 m2

U Tangga ( lantai 4 ke lantai 5 ) m2

Lantai 5

V Balok lantai 5 m2

( EE - PEK.BETON ) Hal. 29
GEDUNG TEKNIK SIPIL POLITEKNIK NEGE
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

No. URAIAN PEKERJAAN UNIT

W Plat lantai 5 m2

X Kolom lantai 5 m2

Y Shear wall lantai 5 m2

Z Tangga ( lantai 5 ke lantai 6 ) m2

Lantai 6

A Balok lantai 6 m2

B Plat lantai 6 m2

C Kolom lantai 6 m2

D Shear wall lantai 6 m2

E Tangga ( lantai 6 ke lantai 7 ) m2

Lantai 7

F Balok lantai 7 m2

G Plat lantai 7 m2

H Kolom lantai 7 m2

I Shear wall lantai 7 m2

J Tangga ( lantai 7 ke lantai 8 ) m2

( EE - PEK.BETON ) Hal. 30
GEDUNG TEKNIK SIPIL POLITEKNIK NEGE
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

No. URAIAN PEKERJAAN UNIT

Lantai 8

K Balok lantai 8 m2

L Plat lantai 8 m2

M Kolom lantai 8 m2

N Shear wall lantai 8 m2

O Tangga ( lantai 8 ke lantai Atap ) m2

Core Lift

R Pit Lift m2

S Core lift Lt. Dasar ke Lt. 2 m2

T Core lift Lt. 2 ke Lt. 3 m2

U Core lift Lt. 3 ke Lt. 4 m2

V Core lift Lt. 4 ke Lt. 5 m2

W Core lift Lt. 5 ke Lt. 6 m2

X Core lift Lt. 6 ke Lt. 7 m2

Y Core lift Lt. 7 ke Lt. 8 m2

Z Core lift Lt. 7 ke Lt. 8 m2

Lantai atap

O Balok lantai Atap m2

P Plat lantai Atap m2

Reinforced bars

Lantai dasar

Q Pile cap

( EE - PEK.BETON ) Hal. 31
GEDUNG TEKNIK SIPIL POLITEKNIK NEGE
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

No. URAIAN PEKERJAAN UNIT

- PC 1 kg
- PC 2
- PC 3
- PC 4
- PC 5
- PC 8
- PC 9
- PC 12
- PC 12 A

R Tie beam kg

( EE - PEK.BETON ) Hal. 32
GEDUNG TEKNIK SIPIL POLITEKNIK NEGE
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

No. URAIAN PEKERJAAN UNIT

PEKERJAAN BETON

Reinforced bars

Lantai dasar

A Plat lantai dasar kg

B Kolom kg

C Shear wall kg

D Tangga ( lantai dasar ke lantai 2 ) kg

Lantai 2

E Balok lantai 2 kg

F Plat lantai 2 kg

G Kolom lantai 2 kg

H Shear wall lantai 2 kg

I Tangga ( lantai 2 ke lantai 3 ) kg

Lantai 3

J Balok lantai 3 kg

K Plat lantai 3 kg

L Kolom lantai 3 kg

M Shear wall lantai 3 kg

N Tangga ( lantai 3 ke lantai 4 ) kg

Lantai 4

O Balok lantai 4 kg

P Plat lantai 4 kg

( EE - PEK.BETON ) Hal. 33
GEDUNG TEKNIK SIPIL POLITEKNIK NEGE
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

No. URAIAN PEKERJAAN UNIT

Q Kolom lantai 4 kg

R Shear wall lantai 4 kg

U Tangga ( lantai 4 ke lantai 5 ) kg

Lantai 5

V Balok lantai 5 kg

W Plat lantai 5 kg

X Kolom lantai 5 kg

Y Shear wall lantai 5 kg

Z Tangga ( lantai 5 ke lantai 6 ) kg

Lantai 6

A Balok lantai 6 kg

B Plat lantai 6 kg

C Kolom lantai 6 kg

D Shear wall lantai 6 kg

E Tangga ( lantai 6 ke lantai 7 ) kg

( EE - PEK.BETON ) Hal. 34
GEDUNG TEKNIK SIPIL POLITEKNIK NEGE
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

No. URAIAN PEKERJAAN UNIT

Lantai 7

F Balok lantai 7 kg

G Plat lantai 7 kg

H Kolom lantai 7 kg

I Shear wall lantai 7 kg

J Tangga ( lantai 7 ke lantai 8 ) kg

Lantai 8

K Balok lantai 8 kg

L Plat lantai 8 kg

M Kolom lantai 8 kg

N Shear wall lantai 8 kg

O Tangga ( lantai 8 ke lantai Atap ) kg

Core Lift

R Pit Lift kg

S Core lift Lt. Dasar ke Lt. 2 kg

T Core lift Lt. 2 ke Lt. 3 kg

U Core lift Lt. 3 ke Lt. 4 kg

V Core lift Lt. 4 ke Lt. 5 kg

W Core lift Lt. 5 ke Lt. 6 kg

X Core lift Lt. 6 ke Lt. 7 kg

Y Core lift Lt. 7 ke Lt. 8 kg

Z Core lift Lt. 7 ke Lt. 8 kg

( EE - PEK.BETON ) Hal. 35
GEDUNG TEKNIK SIPIL POLITEKNIK NEGE
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

No. URAIAN PEKERJAAN UNIT

Lantai atap

S Balok lantai Atap kg

T Plat lantai Atap kg

( EE - PEK.BETON ) Hal. 36
G TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

HARGA
QT' Y SATUAN
Rp.

SUB TOTAL

PPN 10%

TOTAL

( EE - PEK.BETON ) Hal. 37
G TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

HARGA
QT' Y SATUAN
Rp.

( EE - PEK.BETON ) Hal. 38
G TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

HARGA
QT' Y SATUAN
Rp.

539.93 945,835.00 321.64

359.13 945,835.00 296.84

888.90 945,835.00 548.09

163.87 945,835.00 229.69

26.25 945,835.00 10.00

( EE - PEK.BETON ) Hal. 39
G TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

HARGA
QT' Y SATUAN
Rp.

42.71 945,835.00 3.89

117.89 945,835.00 100.31

128.35 945,835.00 159.98

117.79 945,835.00 229.69

26.25 945,835.00 10.00

22.34 945,835.00 6.37

TOTAL dikoleksikan ke Summary

( EE - PEK.BETON ) Hal. 40
G TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

HARGA
QT' Y SATUAN
Rp.

180.24 945,835.00 134.89

237.58 945,835.00 159.98

94.23 945,835.00 155.85

21.00 945,835.00 7.67

20.58 945,835.00 8.18

180.24 945,835.00 120.92

237.58 945,835.00 159.98

82.92 945,835.00 155.85

19.60 945,835.00 7.16

20.58 945,835.00 8.18

180.24 945,835.00 120.92

237.58 945,835.00 159.98

82.92 945,835.00 155.85

19.60 945,835.00 7.16

20.58 945,835.00 8.18

180.24 945,835.00 120.92

( EE - PEK.BETON ) Hal. 41
G TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

HARGA
QT' Y SATUAN
Rp.
237.58 945,835.00 159.98

82.92 945,835.00 155.85

19.60 945,835.00 7.16

20.58 945,835.00 8.18

180.24 945,835.00 120.92

237.58 945,835.00 159.98

77.02 945,835.00 155.85

19.60 945,835.00 7.16

20.58 945,835.00 8.18

180.24 945,835.00 120.92

237.58 945,835.00 159.98

77.02 945,835.00 155.85


-
19.60 945,835.00 7.16

20.58 945,835.00 8.18

( EE - PEK.BETON ) Hal. 42
G TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

HARGA
QT' Y SATUAN
Rp.

178.59 945,835.00 178.59

237.58 945,835.00 237.58

4.88 945,835.00 4.68

12.30 945,835.00 27.54

12.30 945,835.00 5.78

8.40 945,835.00 5.78

8.40 945,835.00 5.78

8.40 945,835.00 5.78

8.40 945,835.00 5.78

8.40 945,835.00 5.78

8.40 945,835.00 5.78

1,165.64 92,430.00 602.73

1,440.20 92,430.00 1,889.38

488.75 92,430.00 2,740.45

829.32 227,433.33 668.64

147.50 227,433.33 53.32

341.70 227,433.33 35.71

( EE - PEK.BETON ) Hal. 43
G TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

HARGA
QT' Y SATUAN
Rp.

TOTAL dikoleksikan ke Summary

( EE - PEK.BETON ) Hal. 44
G TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

HARGA
QT' Y SATUAN
Rp.

805.55 227,433.33 870.90

987.28 227,433.33 862.35

598.92 227,433.33 668.64

147.50 227,433.33 53.32

178.69 227,433.33 35.71

1,241.92 227,433.33 942.66

1,751.80 227,433.33 1,230.63

479.14 227,433.33 386.85

118.00 227,433.33 20.46

164.64 227,433.33 38.32

1,241.92 227,433.33 879.66

1,751.80 227,433.33 1,230.63

448.30 227,433.33 386.85

117.60 227,433.33 20.46

164.64 227,433.33 38.32

1,241.92 227,433.33 879.66

( EE - PEK.BETON ) Hal. 45
G TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

HARGA
QT' Y SATUAN
Rp.
1,751.80 227,433.33 1,230.63

448.30 227,433.33 386.85

117.60 227,433.33 20.46

164.64 227,433.33 38.32

1,241.92 227,433.33 879.66

1,751.80 227,433.33 1,230.63

448.30 227,433.33 386.85

117.60 227,433.33 20.46

164.64 227,433.33 38.32

1,241.92 227,433.33 879.66

1,751.80 227,433.33 1,230.63

435.74 227,433.33 386.85

117.60 227,433.33 20.46

164.64 227,433.33 38.32

( EE - PEK.BETON ) Hal. 46
G TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

HARGA
QT' Y SATUAN
Rp.

1,241.92 227,433.33 879.66

1,751.80 227,433.33 1,230.63

435.74 227,433.33 386.85

117.60 227,433.33 20.46

164.64 227,433.33 38.32

9.76 227,433.33 9.36

24.60 227,433.33 55.08

24.60 227,433.33 11.56

16.80 227,433.33 11.56

16.80 227,433.33 11.56

16.80 227,433.33 11.56

16.80 227,433.33 11.56

16.80 227,433.33 11.56

16.80 227,433.33 11.56

1,224.04 227,433.33 1,224.04

1,751.80 227,433.33 1,751.80

( EE - PEK.BETON ) Hal. 47
G TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

HARGA
QT' Y SATUAN
Rp.
2,352.990 12,697.75 48,008.36
16,047.850 12,697.75
3,218.650 12,697.75
25,730.050 12,697.75
4,500.160 12,697.75
3,895.570 12,697.75
15,022.930 12,697.75
31,249.710 12,697.75
10,121.950 12,697.75

140,733.12 12,697.75 99,271.39

TOTAL dikoleksikan ke Summary

( EE - PEK.BETON ) Hal. 48
G TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

HARGA
QT' Y SATUAN
Rp.

133,225.04 12,697.75 39,061.44

75,196.14 12,697.75 88,882.53

8,105.28 12,697.75 2,359.22

31,182.23 12,697.75 1,612.53

42,019.53 12,697.75 46,786.19

25,450.02 12,697.75 24,617.58

61,526.96 12,697.75 43,809.54

7,786.80 12,697.75 2,359.22

7,962.09 12,697.75 4,285.13

66,159.50 12,697.75 34,793.89

45,157.76 12,697.75 33,832.53

49,221.57 12,697.75 44,038.45

6,229.44 12,697.75 2,358.16

9,870.14 12,697.75 4,768.25

66,159.50 12,697.75 34,086.18

44,769.16 12,697.75 33,876.92

( EE - PEK.BETON ) Hal. 49
G TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

HARGA
QT' Y SATUAN
Rp.
43,260.39 12,697.75 36,531.79

5,814.15 12,697.75 1,744.91

9,870.14 12,697.75 3,990.06

66,159.50 12,697.75 34,086.18

44,769.16 12,697.75 33,876.92

43,260.39 12,697.75 36,531.79

5,814.15 12,697.75 1,744.91

9,870.14 12,697.75 3,990.06

66,159.50 12,697.75 34,086.18

44,769.16 12,697.75 33,876.92

43,260.39 12,697.75 36,531.79

5,814.15 12,697.75 1,744.91

9,870.14 12,697.75 3,990.06

( EE - PEK.BETON ) Hal. 50
G TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

HARGA
QT' Y SATUAN
Rp.

66,159.50 12,697.75 34,086.18

44,769.16 12,697.75 33,876.92

40,268.26 12,697.75 36,531.79

5,814.15 12,697.75 1,744.91

9,870.14 12,697.75 3,990.06

66,159.50 12,697.75 34,086.18

44,769.16 12,697.75 33,876.92

40,268.26 12,697.75 36,531.79

5,814.15 12,697.75 1,744.91

9,870.14 12,697.75 3,990.06

1,910.16 12,697.75 23,909.36

4,814.54 12,697.75 5,115.06

4,814.54 12,697.75 5,115.02

3,287.98 12,697.75 5,115.07

3,287.98 12,697.75 2,617.82

3,287.98 12,697.75 2,617.82

3,287.98 12,697.75 2,617.82

3,287.98 12,697.75 2,617.82

3,287.98 12,697.75 2,617.82

( EE - PEK.BETON ) Hal. 51
G TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

HARGA
QT' Y SATUAN
Rp.

65,287.58 12,697.75 65,287.58

45,157.76 12,697.75 45,157.76

TOTAL dikoleksikan ke Summary

( EE - PEK.BETON ) Hal. 52
PEKERJAAN BETON
TOTAL
HARGA
Rp.

2,301,596,544.21

4,125,699,562.57

9,625,720,503.37

19,734,681,712.91

35,787,698,323.06

Exlude

35,787,698,323.06

( EE - PEK.BETON ) Hal. 53
PEKERJAAN BETON
TOTAL
HARGA
Rp.

( EE - PEK.BETON ) Hal. 54
PEKERJAAN BETON
TOTAL
HARGA
Rp.

510,684,076.76

339,679,615.22

840,753,299.00

154,993,508.53

24,828,168.75

( EE - PEK.BETON ) Hal. 55
PEKERJAAN BETON
TOTAL
HARGA
Rp.

40,398,504.52

111,501,083.14

121,394,517.24

111,409,431.73

24,828,168.75

21,126,170.56

2,301,596,544.21

( EE - PEK.BETON ) Hal. 56
PEKERJAAN BETON
TOTAL
HARGA
Rp.

170,480,421.66

224,714,316.81

89,127,545.39

19,862,535.00

19,465,284.30

170,480,421.66

224,714,316.81

78,427,314.03

18,538,366.00

19,465,284.30

170,480,421.66

224,714,316.81

78,427,314.03

18,538,366.00

19,465,284.30

170,480,421.66

( EE - PEK.BETON ) Hal. 57
PEKERJAAN BETON
TOTAL
HARGA
Rp.
224,714,316.81

78,427,314.03

18,538,366.00

19,465,284.30

170,480,421.66

224,714,316.81

72,843,860.86

18,538,366.00

19,465,284.30

170,480,421.66

224,714,316.81

72,843,860.86

18,538,366.00

19,465,284.30

( EE - PEK.BETON ) Hal. 58
PEKERJAAN BETON
TOTAL
HARGA
Rp.

168,912,700.14

224,714,316.81

4,615,674.80

11,633,770.50

11,633,770.50

7,945,014.00

7,945,014.00

7,945,014.00

7,945,014.00

7,945,014.00

7,945,014.00

107,740,197.63

133,117,686.00

45,175,162.50

188,615,012.00

33,546,416.67

77,713,060.27

( EE - PEK.BETON ) Hal. 59
PEKERJAAN BETON
TOTAL
HARGA
Rp.

4,125,699,562.57

( EE - PEK.BETON ) Hal. 60
PEKERJAAN BETON
TOTAL
HARGA
Rp.

183,208,011.93

224,540,381.33

136,214,372.00

33,546,416.67

40,639,607.47

282,452,868.17

398,417,713.33

108,971,497.60

26,837,133.33

37,444,624.00

282,452,868.17

398,417,713.33

101,959,273.07

26,746,160.00

37,444,624.00

282,452,868.17

( EE - PEK.BETON ) Hal. 61
PEKERJAAN BETON
TOTAL
HARGA
Rp.
398,417,713.33

101,959,273.07

26,746,160.00

37,444,624.00

282,452,868.17

398,417,713.33

101,959,273.07

26,746,160.00

37,444,624.00

282,452,868.17

398,417,713.33

99,102,710.40

26,746,160.00

37,444,624.00

( EE - PEK.BETON ) Hal. 62
PEKERJAAN BETON
TOTAL
HARGA
Rp.

282,452,868.17

398,417,713.33

99,102,710.40

26,746,160.00

37,444,624.00

2,219,749.33

5,594,860.00

5,594,860.00

3,820,880.00

3,820,880.00

3,820,880.00

3,820,880.00

3,820,880.00

3,820,880.00

278,387,497.33

398,417,713.33

( EE - PEK.BETON ) Hal. 63
PEKERJAAN BETON
TOTAL
HARGA
Rp.
29,877,678.77
203,771,587.34
40,869,613.04
326,713,742.39
57,141,906.64
49,464,973.97
190,757,409.41
396,801,005.15
128,525,990.61

1,786,993,942.72

9,625,720,503.37

( EE - PEK.BETON ) Hal. 64
PEKERJAAN BETON
TOTAL
HARGA
Rp.

1,691,658,221.31

954,821,739.80

102,918,800.43

395,944,115.90

533,553,485.49

323,158,053.14

781,253,964.78

98,874,871.84

101,100,691.23

840,076,737.24

573,401,950.29

625,003,171.82

79,099,897.47

125,328,529.30

840,076,737.24

568,467,577.42

( EE - PEK.BETON ) Hal. 65
PEKERJAAN BETON
TOTAL
HARGA
Rp.
549,309,598.94

73,826,570.97

125,328,529.30

840,076,737.24

568,467,577.42

549,309,598.94

73,826,570.97

125,328,529.30

840,076,737.24

568,467,577.42

549,309,598.94

73,826,570.97

125,328,529.30

( EE - PEK.BETON ) Hal. 66
PEKERJAAN BETON
TOTAL
HARGA
Rp.

840,076,737.24

568,467,577.42

511,316,276.64

73,826,570.97

125,328,529.30

840,076,737.24

568,467,577.42

511,316,276.64

73,826,570.97

125,328,529.30

24,254,706.85

61,133,789.81

61,133,789.81

41,749,905.24

41,749,905.24

41,749,905.24

41,749,905.24

41,749,905.24

41,749,905.24

( EE - PEK.BETON ) Hal. 67
PEKERJAAN BETON
TOTAL
HARGA
Rp.

829,005,389.91

573,401,950.29

19,734,681,712.91

( EE - PEK.BETON ) Hal. 68
GEDUNG TEKNIK SIPIL POLITEKNIK NEGERI M
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

No. URAIAN PEKERJAAN UNIT QT' Y

PROYEK POLITEKNIK NEGERI MALANG


BANGUNAN RUANG KULIAH TEKNIK SIPIL

SUMMARY
PEKERJAAN BAJA

Halaman 2

(EE - PEK. BAJA ) Hal. 69


GEDUNG TEKNIK SIPIL POLITEKNIK NEGERI M
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

No. URAIAN PEKERJAAN UNIT QT' Y

(EE - PEK. BAJA ) Hal. 70


GEDUNG TEKNIK SIPIL POLITEKNIK NEGERI M
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

No. URAIAN PEKERJAAN UNIT QT' Y

PEKERJAAN BAJA

Pekerjaan Baja sudah termasuk setting out untuk perletakan struktur baja

Pekerjaan struktur baja sudah termasuk biaya untuk pengecatan dasar


( Zinchromate ), sebanyak 3 lapis dengan warna berbeda antara lapisan pertama
dengan lapisan berikutnya
Harga satuan sudah termasuk biaya Pabrikasi, Transportasi dan biaya Erection di site

Harga sudah termasuk perlengkapan pendukung pekerjaan dan sesuai dengan


gambar dan spesifikasi teknis

Pekerjaan harus sesuai gambar dan spesifikasi teknis

Termasuk kebersihan dan kerapihan

Pekerjaan Rangka Baja

A Kolom Pipa Ø 30 cm, t : 1,6 mm kg 78,341.12


B Rangka Pipa Ø 15 cm, t : 1,0 mm kg 90,550.06
C Rangka Pipa Ø 8 cm, t : 0,6 mm kg 34,543.77
D Ikatan Angin Ø 19 mm kg 1,879.68
E trekstang kg 1,098.99
F Gording Pipa Ø 10 cm, t : 0,8 mm kg 105,226.56
G Angkur bh 384.00
H Grouting ttk 48.00

Pekerjaan Separator Beam

I WF 200.100.5,5.8 kg 639.90
J Plat t : 10 mm kg 44.15
K Dynabolt M 16 bh 120.00
L Grouting ttk 30.00

(EE - PEK. BAJA ) Hal. 71


GEDUNG TEKNIK SIPIL POLITEKNIK NEGERI M
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

No. URAIAN PEKERJAAN UNIT QT' Y

TOTAL dikole

(EE - PEK. BAJA ) Hal. 72


LITEKNIK NEGERI MALANG
NG ESTIMATE
STRUKTUR
PEKERJAAN BAJA
HARGA TOTAL
SATUAN HARGA
Rp. Rp.

7,208,052,444.00

SUB TOTAL 7,208,052,444.00

PPN 10% Exclude

TOTAL 7,208,052,444.00

(EE - PEK. BAJA ) Hal. 73


LITEKNIK NEGERI MALANG
NG ESTIMATE
STRUKTUR
PEKERJAAN BAJA
HARGA TOTAL
SATUAN HARGA
Rp. Rp.

(EE - PEK. BAJA ) Hal. 74


LITEKNIK NEGERI MALANG
NG ESTIMATE
STRUKTUR
PEKERJAAN BAJA
HARGA TOTAL
SATUAN HARGA
Rp. Rp.

22,800.00 1,786,177,536.00
22,800.00 2,064,541,368.00
22,800.00 787,597,956.00
22,800.00 42,856,704.00
22,800.00 25,056,972.00
22,800.00 2,399,165,568.00
165,000.00 63,360,000.00
50,000.00 2,400,000.00

22,800.00 14,589,720.00
22,800.00 1,006,620.00
165,000.00 19,800,000.00
50,000.00 1,500,000.00

(EE - PEK. BAJA ) Hal. 75


LITEKNIK NEGERI MALANG
NG ESTIMATE
STRUKTUR
PEKERJAAN BAJA
HARGA TOTAL
SATUAN HARGA
Rp. Rp.

TOTAL dikoleksikan ke Summary 7,208,052,444.00

(EE - PEK. BAJA ) Hal. 76


GEDUNG TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

No. URAIAN PEKERJAAN UNIT QT' Y

PROYEK POLITEKNIK NEGERI MALANG


BANGUNAN RUANG KULIAH TEKNIK SIPIL

SUMMARY
PEKERJAAN LAIN LAIN

Halaman 2

(EE - PEK. LAIN LAIN ) Hal. 77


GEDUNG TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

No. URAIAN PEKERJAAN UNIT QT' Y

(EE - PEK. LAIN LAIN ) Hal. 78


GEDUNG TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

No. URAIAN PEKERJAAN UNIT QT' Y

PEKERJAAN LAIN LAIN

Pekerjaan water proofing ( Asumsi membrane ) termasuk screed,


untuk atap di

A Lantai dasar m2 4,444.50

B lantai Atap m2 1,751.80

(EE - PEK. LAIN LAIN ) Hal. 79


GEDUNG TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

No. URAIAN PEKERJAAN UNIT QT' Y

TOTAL dikoleksikan ke Summa

(EE - PEK. LAIN LAIN ) Hal. 80


ERI MALANG

PEKERJAAN LAIN LAIN


HARGA TOTAL
SATUAN HARGA
Rp. Rp.

650,611,815.00

SUB TOTAL 650,611,815.00

PPN 10% Exlude

TOTAL 650,611,815.00

(EE - PEK. LAIN LAIN ) Hal. 81


ERI MALANG

PEKERJAAN LAIN LAIN


HARGA TOTAL
SATUAN HARGA
Rp. Rp.

(EE - PEK. LAIN LAIN ) Hal. 82


ERI MALANG

PEKERJAAN LAIN LAIN


HARGA TOTAL
SATUAN HARGA
Rp. Rp.

105,000.00 466,672,815.00

105,000.00 183,939,000.00

(EE - PEK. LAIN LAIN ) Hal. 83


ERI MALANG

PEKERJAAN LAIN LAIN


HARGA TOTAL
SATUAN HARGA
Rp. Rp.

dikoleksikan ke Summary 650,611,815.00

(EE - PEK. LAIN LAIN ) Hal. 84


GEDUNG TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

No. URAIAN PEKERJAAN UNIT QT' Y

PROYEK POLITEKNIK NEGERI MALANG


BANGUNAN RUANG KULIAH TEKNIK SIPIL

SUMMARY
PEKERJAAN PASANGAN ATAP

Halaman 2

( BQ_PEK.ATAP ) Hal. 85
GEDUNG TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

No. URAIAN PEKERJAAN UNIT QT' Y

( BQ_PEK.ATAP ) Hal. 86
GEDUNG TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

No. URAIAN PEKERJAAN UNIT QT' Y

PEKERJAAN PASANGAN ATAP

Harga pekerjaan ini sudah termasuk untuk pekerjaan pembengkokan,


pemotongan,membuat lubang untuk pipa talang, sekrup, baut, klem pegangan,
solder dan peralatan lain yang dibutuhkan.

Pekerjaan pemasangan atap ( lapisan pembungkus), harus sesuai dengan instruksi dari pabrik.

Harga sudah termasuk perlengkapan pendukung pekerjaan dan sesuai dengan spesifikasi teknis.

Sudah termasuk fabrikasi dan erektion dilapangan.

Pekerjaan harus sesuai gambar dan spesifikasi teknis

Termasuk kebersihan dan kerapihan

Pekerjaan atap

Pekerjaan atap metal t 0,55 mm, termasuk lapisan


insulation, untuk

Lantai Dasar m2 3,267.98

Korridor lantai dasar m2 91.88

( BQ_PEK.ATAP ) Hal. 87
GEDUNG TEKNIK SIPIL POLITEKNIK NEGERI MALANG
ENGINEERING ESTIMATE
PEKERJAAN STRUKTUR

No. URAIAN PEKERJAAN UNIT QT' Y

TOTAL dikoleksikan ke Summa

( BQ_PEK.ATAP ) Hal. 88
ERI MALANG

PEKERJAAN ATAP
HARGA TOTAL
SATUAN HARGA
Rp. Rp.

1,007,957,700.00

SUB TOTAL 1,007,957,700.00

PPN 10% Exlude

TOTAL 1,007,957,700.00

( BQ_PEK.ATAP ) Hal. 89
ERI MALANG

PEKERJAAN ATAP
HARGA TOTAL
SATUAN HARGA
Rp. Rp.

( BQ_PEK.ATAP ) Hal. 90
ERI MALANG

PEKERJAAN ATAP
HARGA TOTAL
SATUAN HARGA
Rp. Rp.

300,000.00 980,395,200.00

300,000.00 27,562,500.00

( BQ_PEK.ATAP ) Hal. 91
ERI MALANG

PEKERJAAN ATAP
HARGA TOTAL
SATUAN HARGA
Rp. Rp.

dikoleksikan ke Summary 1,007,957,700.00

( BQ_PEK.ATAP ) Hal. 92
ANALISA HARGA SATUAN PEKERJAAN
PROYEK POLITEKNIK NEGRI, MALANG

GALIAN TANAH + URUG KEMBALI / m3


Galian
Pekerja md 0.14 35,000.00 = 5,000.00
Tukang md 0.11 45,000.00 = 4,821.43
Kepala tukang md 0.07 55,000.00 = 3,928.57
Mandor md 0.04 70,000.00 = 2,500.00
Urugan
Pekerja md 0.07 35,000.00 = 2,500.00
Tukang md 0.06 45,000.00 = 2,678.57
Kepala tukang md 0.04 55,000.00 = 1,964.29
Mandor md 0.01 70,000.00 = 833.33
SUB TOTAL = 24,226.19
Jasa & Keuntungan 10% =
TOTAL = 24,226.19
Rounded = 31,000.00

PASIRB URUG / m3
Pasir urug m3 1.00 95,000.00 95,000.00
Waste 20% m3 0.20 95,000.00 19,000.00
Alat bantu ls 1.00 1,000.00 1,000.00
Pekerja md 0.11 35,000.00 = 3,750.00
Tukang md 0.07 45,000.00 = 3,214.29
Kepala tukang md 0.04 55,000.00 = 1,964.29
Mandor md 0.01 70,000.00 = 833.33
SUB TOTAL = 124,761.90
Jasa & Keuntungan 10% =
TOTAL = 124,761.90
Rounded = 124,700.00
tebal 10 cm 18,705.00

LANTAI KERJA / m3
Concrete B0 m3 1.00 525,000.00 = 525,000.00
Waste 5 % m3 0.05 525,000.00 = 26,250.00
Alat & bahan bantu ls 1.00 50,000.00 = 50,000.00
Pekerja md 0.47 35,000.00 = 16,450.00
Tukang md 0.15 45,000.00 = 6,750.00
Kepala tukang md 0.02 55,000.00 = 825.00
Mandor md 0.00 70,000.00 = 105.00
SUB TOTAL = 625,380.00
Jasa & Keuntungan 10% =
TOTAL = 625,380.00
Rounded = 625,300.00
tebal 5 cm 31,265.00
BETON FC' 35 Mpa / m3
Concrete Fc' 35 Mpa m3 1.00 600,000.00 = 600,000.00
Waste 5 % m3 0.05 600,000.00 = 30,000.00
Alat & bahan bantu ls 1.00 50,000.00 = 50,000.00
Pekerja md 0.47 35,000.00 = 16,450.00
Tukang md 0.15 45,000.00 = 6,750.00
Kepala tukang md 0.02 55,000.00 = 825.00
Mandor md 0.00 70,000.00 = 105.00
SUB TOTAL = 704,130.00
Jasa & Keuntungan 10% =
TOTAL = 704,130.00
Rounded = 704,100.00

BETON FC' 305 Mpa / m3


Concrete Fc' 35 Mpa m3 1.00 565,000.00 = 565,000.00
Waste 5 % m3 0.05 565,000.00 = 28,250.00
Alat & bahan bantu ls 1.00 50,000.00 = 50,000.00
Pekerja md 0.47 35,000.00 = 16,450.00
Tukang md 0.15 45,000.00 = 6,750.00
Kepala tukang md 0.02 55,000.00 = 825.00
Mandor md 0.00 70,000.00 = 105.00
SUB TOTAL = 667,380.00
Jasa & Keuntungan 10% =
TOTAL = 667,380.00
Rounded = 640,000.00

BESI BETON / kg
Besi beton kg 1.00 7,250.00 = 7,250.00
Waste 5% kg 0.05 7,250.00 = 362.50
Kawat bendrad kg 0.00 15,000.00 = 15.00
Alat & bahan bantu ls 1.00 - = -
Pekerja md 0.01 35,000.00 = 210.00
Tukang md 0.01 45,000.00 = 270.00
Kepala tukang md 0.00 55,000.00 = 27.50
Mandor md 0.00 70,000.00 = 14.00
SUB TOTAL = 8,149.00
Jasa & Keuntungan 10% =
TOTAL = 8,149.00
Rounded = 7,885.00
BEKESTING KAYU / m2
Plywood t 18 mm m2 12.50 135,000.00 = 1,687,500.00
Balok kayu 5 x 7 cm m3 0.22 2,000,000.00 = 440,000.00
Balok kayu 6 x 12 cm m3 0.30 2,150,000.00 = 645,000.00
Jack base bh 14.38 5,000.00 = 71,900.00
Main frame bh 6.94 7,000.00 = 48,580.00
Joint pin bh 14.38 1,100.00 = 15,818.00
Cross barce bh 25.78 5,000.00 = 128,900.00
U Head bh 14.38 5,000.00 = 71,900.00
Paku kg 0.23 15,000.00 = 3,450.00
Minyak bekesting kg 0.20 10,000.00 = 2,000.00
Bahan bantu ls 1.00 100,000.00 = 100,000.00
SUB TOTAL = 3,215,048.00
per m2 = 257,203.84
1 x pakai = 85,734.61
Pekerja md 0.01 35,000.00 = 224.00
Tukang md 0.01 45,000.00 = 279.00
Kepala tukang md 0.00 55,000.00 = 33.00
Mandor md 0.00 70,000.00 = 21.00
SUB TOTAL = 86,291.61
Jasa & Keuntungan 10% =
TOTAL = 86,291.61
Rounded = 86,200.00

STRUKTUR BAJA / kg
Row material ( WF, INP etc ) kg 1.00 16,900.00 = 16,900.00
Waste 2,5% kg 0.00 16,900.00 = 42.25
Alat & bahan bantu ls 1.00 1,500.00 = 1,500.00
Pekerja ( fabrikasi ) md 0.02 45,000.00 = 900.00
Tukang ( fabrikasi ) md 0.02 60,000.00 = 1,020.00
Kepala tukang ( fabrikasi ) md 0.00 70,000.00 = 280.00
Mandor ( fabrikasi ) md 0.00 80,000.00 = 48.00
Tranportasi ls 1.00 500.00 = 500.00
Pekerja ( fabrikasi ) md 0.01 45,000.00 = 450.00
Tukang ( fabrikasi ) md 0.01 60,000.00 = 600.00
Kepala tukang ( fabrikasi ) md 0.00 70,000.00 = 70.00
Mandor ( fabrikasi ) md 0.00 80,000.00 = 8.00
Alat bantu ls 1.00 500.00 = 500.00
SUB TOTAL = 22,818.25
Jasa & Keuntungan 10% =
TOTAL = 22,818.25
Rounded = 22,800.00
DAFTAR HARGA BAHAN DAN UPAH KERJA

Pekerjaan : Belanja Modal Gedung dan Bangunan berupa Pembangunan Gedung Teknik Sipil
Politeknik Negeri Malang
Lokasi : Jl. Sukarno-Hatta, Malang

No. Bahan Satuan


1 Batu pecah/split 2/3 m³
2 Batu kali m³
3 Bata merah bh
4 Bataco bh
5 Besi pelat strip kg
6 Besi beton polos kg
7 Besi beton ulir kg
8 Besi profil kg
9 Besi baja WF kg
10 Besi baja Siku kg
11 Besi baja plat kg
12 Besi baja profil C kg
13 Besi baja beton kg
14 Besi pipa 5" kg
15 Kawat beton kg
16 Kayu dolken Ø 8-10/400 cm btg
17 Kayu Meranti m³
18 Kayu Terentang kaso m³
19 Kayu Terentang papan 3 cm m³
20 Minyak Bekisting lt
21 Pasir beton m³
22 Paku biasa 2"-5" kg
23 Pasir urug m³
24 Pasir pasang m³
25 Semen portland kg
26 Seng gelombang 3x6 ft BJLS 20 (0,2 mm) Lbr
27 Sirtu m³
28 Sewa truk jln
29 Teakwood 4x8 ft 3 mm lbr
30 Triplek 4x8 ft 9 mm lbr
31 Vibrating Roller 6-8 Ton jam
No. Upah Satuan
1 Mandor Oh
2 Kepala tukang Oh
3 Tukang kayu Oh
4 Tukang besi Oh
5 Tukang batu Oh
6 Pekerja Oh
7 Sopir Oh
PAH KERJA

angunan Gedung Teknik Sipil

Harga
215,000.00
165,000.00
650.00
2,200.00
14,200.00
9,935.00
9,935.00
16,900.00
16,900.00
16,900.00
16,900.00
16,900.00
16,900.00
19,600.00
22,500.00
23,000.00
5,000,000.00
4,750,000.00
5,500,000.00
27,500.00
185,000.00
23,000.00
110,000.00
180,000.00
1,290.00
60,000.00
125,000.00
425,000.00
60,000.00
200,000.00
350,000.00
Harga
80,000.00
70,000.00
60,000.00
60,000.00
60,000.00
45,000.00
80,000.00
RENCANA ANGGARAN BIAYA

Pekerjaan : Belanja Modal Gedung dan Bangunan berupa Pembangunan Gedung Teknik Sipil
Politeknik Negeri Malang
Lokasi : Jl. Sukarno-Hatta, Malang

1 Pengeboran dia. 80 cm --> V = 5,520.000 m'


Volume pelaksanaan/dr MTA = 5,520.000 m'
Upah tenaga:
- Mobdemob Crane Bor & Crane S ls 1.000 100,000,000.00 100,000,000.00
- Upah Pengeboran dari MTA m' 5,520.000 280,000.00 1,545,600,000.00
umlah Upah Tenaga
Jumlah Total
Jumlah Total / m'
Jumlah

2 Loading Test ---> V = 2.000 ttk


Upah tenaga:
- Mobdemob Alat Loading + Beto ls 1.000 100,000,000.00 100,000,000.00
- Jasa Loading test Tekan (Vertik ttk 2.000 50,000,000.00 100,000,000.00
umlah Upah Tenaga
Jumlah Total
Jumlah Total / ttk
Jumlah

3 Pembesian dengan besi polos tiap 1 kg


Harga bahan:
- Besi beton polos kg 1.050 9,935.00 10,431.75
- Kawat beton kg 0.018 22,500.00 405.00
Jumlah Harga Bahan
Upah tenaga:
- Pekerja Oh 0.007 45,000.00 315.00
- Tukang besi Oh 0.007 60,000.00 420.00
- Kepala tukang Oh 0.001 70,000.00 49.00
- Mandor Oh 0.000 80,000.00 32.00
- Alat bantu ls 1.000 1,000.00 1,000.00
Jumlah Upah Tenaga
Jumlah Total
Jumlah
4 Pembesian dengan besi ulir tiap 1 kg
Harga bahan:
- Besi beton ulir kg 1.050 9,935.00 10,431.75
- Kawat beton kg 0.020 22,500.00 450.00
Jumlah Harga Bahan
Upah tenaga:
- Pekerja Oh 0.007 45,000.00 315.00
- Tukang besi Oh 0.007 60,000.00 420.00
- Kepala tukang Oh 0.001 70,000.00 49.00
- Mandor Oh 0.000 80,000.00 32.00
- Alat bantu ls 1.000 1,000.00 1,000.00
Jumlah Upah Tenaga
Jumlah Total
Jumlah
5 Urugan pasir urug tiap 1 m³
Harga bahan:
- Pasir urug m³ 1.200 110,000.00 132,000.00
Jumlah Harga Bahan
Upah tenaga:
- Pekerja Oh 0.300 45,000.00 13,500.00
- Mandor Oh 0.010 80,000.00 800.00
- Alat bantu ls 1.000 2,000.00 2,000.00
Jumlah Upah Tenaga
Jumlah Total
Jumlah

6 Beton Non Struktur 1Pc : 3Ps : 5Kr - untuk rabatan/ beton tumbuk tiap 1m³
Harga bahan:
- Semen portland kg 218.000 1,290.00 281,220.00
- Pasir beton m³ 0.520 185,000.00 96,200.00
- Batu pecah/split 2/3 m³ 0.870 215,000.00 187,050.00
Jumlah Harga Bahan
Upah tenaga:
- Pekerja Oh 1.650 45,000.00 74,250.00
- Tukang batu Oh 0.250 60,000.00 15,000.00
- Kepala tukang Oh 0.025 70,000.00 1,750.00
- Mandor Oh 0.080 80,000.00 6,400.00
- Alat bantu ls 1.000 15,000.00 15,000.00
Jumlah Upah Tenaga
Jumlah Total
Jumlah

7 Beton Struktur K-250 (1Pc : 1,65Ps : 3Kr) tiap 1m³


Harga bahan:
- Semen portland kg 375.000 1,290.00 483,750.00
- Pasir beton m³ 0.451 185,000.00 83,435.00
- Batu pecah/split 2/3 m³ 0.780 215,000.00 167,700.00
Jumlah Harga Bahan
Koefisien wish beton bored pile
Jumlah Bahan
Upah tenaga:
- Pekerja Oh 2.000 45,000.00 90,000.00
- Tukang batu Oh 0.350 60,000.00 21,000.00
- Kepala tukang Oh 0.035 70,000.00 2,450.00
- Mandor Oh 0.100 80,000.00 8,000.00
- Alat bantu ls 1.000 20,000.00 20,000.00
Jumlah Upah Tenaga
Jumlah Total
Jumlah
8 Beton Struktur K-350 (1Pc : 1,5Ps : 2,75Kr) tiap 1m³
Harga bahan:
- Semen portland kg 425.000 1,290.00 548,250.00
- Pasir beton m³ 0.442 185,000.00 81,770.00
- Batu pecah/split 2/3 m³ 0.811 215,000.00 174,365.00
Jumlah Harga Bahan
Upah tenaga:
- Pekerja Oh 2.000 45,000.00 90,000.00
- Tukang batu Oh 0.350 60,000.00 21,000.00
- Kepala tukang Oh 0.035 70,000.00 2,450.00
- Mandor Oh 0.100 80,000.00 8,000.00
- Alat bantu ls 1.000 20,000.00 20,000.00
Jumlah Upah Tenaga
Jumlah Total
Jumlah

9 Pasangan Bekisting Bataco 1m²


Catatan: Ukuran bataco 40 x 20 x 10 cm.
Harga bahan:
- Bataco bh 12.500 2,200.00 27,500.00
- Semen portland kg 9.000 1,290.00 11,610.00
- Pasir pasang m³ 0.094 180,000.00 16,920.00
Jumlah Harga Bahan
Upah tenaga:
- Pekerja Oh 0.300 45,000.00 13,500.00
- Tukang batu Oh 0.100 60,000.00 6,000.00
- Kepala tukang Oh 0.010 70,000.00 700.00
- Mandor Oh 0.015 80,000.00 1,200.00
- Alat bantu ls 1.000 15,000.00 15,000.00
umlah Upah Tenaga
Jumlah Total
Jumlah

10 Pasang bekisting kayu m2


Harga bahan:
- Kayu Terentang kaso m³ 0.035 4,750,000.00 166,250.00
- Paku biasa 2"-5" kg 0.400 23,000.00 9,200.00
- Minyak bekisting lt 0.200 27,500.00 5,500.00
- Kayu Meranti Palembang balok m³ 0.020 5,000,000.00 100,000.00
- Triplek 4x8 ft 9 mm lbr 0.350 200,000.00 70,000.00
- Kayu dolken Ø 8-10/400 cm btg 6.000 23,000.00 138,000.00
Jumlah Harga Bahan
Upah tenaga: 3X PEMAKAIAN
- Pekerja Oh 0.660 45,000.00 29,700.00
- Tukang kayu Oh 0.330 60,000.00 19,800.00
- Kepala tukang Oh 0.033 70,000.00 2,310.00
- Mandor Oh 0.033 80,000.00 2,640.00
- Alat bantu ls 1.000 10,000.00 10,000.00
Jumlah Upah Tenaga
Jumlah Total
Jumlah
11 Pembuangan tanah dgn truk kap. 6 m3 tiap 1 m³
Kapasitas Remove 3 trip / day 18 m3
Upah tenaga:
- Sewa Truck (kapasitas 4 M3) unt 1.000 425,000.00 425,000.00
- BBM (Solar) ltr 20.000 7,150.00 143,000.00
- Sopir Truck hari 1.000 80,000.00 80,000.00
- Pekerja Gali Tanah org/hr 4.000 45,000.00 180,000.00
umlah Upah Tenaga
Jumlah Total
Jumlah Total / m3
Jumlah

12 Pasang Floor Hardener tiap 1 m²


Harga bahan:
- Floor Hardener PM-700 kg 5.000 32,000.00 160,000.00
Jumlah Harga Bahan
Upah tenaga:
- Pekerja Oh 0.120 45,000.00 5,400.00
- Tukang batu Oh 0.120 60,000.00 7,200.00
- Kepala tukang Oh 0.012 70,000.00 840.00
- Mandor Oh 0.006 80,000.00 480.00
- Alat bantu ls 1.000 10,000.00 10,000.00
Jumlah Upah Tenaga
Jumlah Total
Jumlah

13 1 m2 Pekerjaan cut /m3


Analisa 1 hari 7 jam kapasitas 100 m3
Sewa Alat berat ecxafator PC-2 jam 8.0000 400,000.00 3,200,000.00
Solar ltr 200.0000 7,150.00 1,430,000.00
Operator Oh 1.0000 100,000.00 100,000.00
Pekerja Oh 2.0000 45,000.00 90,000.00
Mandor Oh 0.0670 80,000.00 5,360.00
Sub total :
Cut /m3
Jumlah
Teknik Sipil

1,645,600,000.00
1,645,600,000.00
298,115.94
298,115.94

200,000,000.00
200,000,000.00
100,000,000.00
100,000,000.00

10,836.75

1,816.00
12,652.75
12,652.75

10,881.75

1,816.00
12,697.75
12,697.75
132,000.00

16,300.00
148,300.00
148,300.00

564,470.00

112,400.00
676,870.00
676,870.00

734,885.00
1.250
918,606.25

141,450.00
1,060,056.25
1,060,056.25
804,385.00

141,450.00
945,835.00
945,835.00

56,030.00

36,400.00
92,430.00
92,430.00

488,950.00
162,983.33

64,450.00
227,433.33
227,433.33
828,000.00
828,000.00
46,000.00
46,000.00

160,000.00

23,920.00
183,920.00
183,920.00

4,825,360.00
48,253.60
48,253.60