Anda di halaman 1dari 230

REKAPITULASI

ENGINEERING ESTIMATE
(EE)
Pekerjaan : Pembangunan Politeknik KP Pangandaran
Lokasi : Pangandaran - Jawa Barat
Thn Anggaran : 2018

JUMLAH HARGA
NO. JENIS PEKERJAAN
(Rp.)

I PEKERJAAN PERSIAPAN 124,013,330.00

II PEKERJAAN SITE DEVELOPMENT 5,436,126,391.37

III A GEDUNG REKTORAT


1 STRUKTUR 5,503,798,630.08
2 ARSITEKTUR 4,839,519,363.38
3 MEKANIKAL DAN ELEKTRIKAL 3,926,146,220.00

B GEDUNG KULIAH
1 STRUKTUR 3,639,694,783.95
2 ARSITEKTUR 4,191,870,057.14
3 MEKANIKAL DAN ELEKTRIKAL 1,592,989,420.00

C GEDUNG ASRAMA PUTRI


1 STRUKTUR 4,975,556,487.47
2 ARSITEKTUR 3,259,681,781.65
3 MEKANIKAL DAN ELEKTRIKAL 1,388,949,690.00

IV BANGUNAN PENDUKUNG
1 JARINGAN AIR BERSIH 1,900,961,087.72
2 RUMAH POMPA 803,195,979.00
3 GARDU PLN 87,120,772.83
4 SITE (POWER HOUSE) 2,183,027,060.78
5 SITE (PUMP ROOM) 184,091,070.00

JUMLAH 44,036,742,125.36
PPN 10% 4,403,674,212.54
JUMLAH TOTAL 48,440,416,337.89
DIBULATKAN 48,440,416,000.00

Terbilang :
Empat Puluh Delapan Milyar Empat Ratus Empat Puluh Juta Empat Ratus Enam Belas Ribu Rupiah

Bandung, 2018
Konsultan Perencana
PT. SANGKURIANG

Ir. DARWIN
Direktur
REKAPITULASI
ENGINEERING ESTIMATE
(EE)
Pekerjaan : Pembangunan Politeknik KP Pangandaran
Lokasi : Pangandaran - Jawa Barat
Thn Anggaran : 2018

JUMLAH HARGA
NO. JENIS PEKERJAAN
(Rp.)

I PEKERJAAN PERSIAPAN DAN SARANA KERJA 124,013,330.00

jumlah 124,013,330.00
ENGINEERING ESTIMATE
(EE)

Pekerjaan : Pembangunan Politeknik KP Pangandaran


Lokasi : Pangandaran - Jawa Barat
Thn Anggaran : 2018

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

I PEKERJAAN PERSIAPAN DAN SARANA KERJA


1 Mobilisasi & Demobilisasi Ls 1.00 56,189,400.00 56,189,400.00
2 Papan nama proyek bh 1.00 562,000.00 562,000.00
3 Penyediaan Air kerja bln 6.00 750,000.00 4,500,000.00
4 Penerangan & Listrik Kerja bln 6.00 2,000,000.00 12,000,000.00
5 Foto dokumentasi proyek Ls 1.00 2,000,000.00 2,000,000.00
6 Pengukuran dan Pasang Bouwplank m' 1,455.58 33,500.00 48,761,930.00
JUMLAH 124,013,330.00

EE PERSIAPAN Page 3
REKAPITULASI
ENGINEERING ESTIMATE
(EE)
Pekerjaan : Pembangunan Politeknik KP Pangandaran
Lokasi : Pangandaran - Jawa Barat
Thn Anggaran : 2018

JUMLAH HARGA
NO. JENIS PEKERJAAN
(Rp.)

I PEKERJAAN SITE DEVELOPMENT 5,436,126,391.37

jumlah 5,436,126,391.37
ENGINEERING ESTIMATE

(EE)

Pekerjaan : Pembangunan Politeknik KP Pangandaran


Lokasi : Pangandaran - Jawa Barat
Thn Anggaran : 2016

HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

KOLAM BUDIDAYA

PEKERJAAN STRUKTUR
A PEKERJAAN TANAH
I PEKERJAAN GALIAN
1 Pek. Galian Tanah Kolam Budidaya A m3 1,622.74 54,900.00 89,088,426.00
2 Pek. Galian Tanah Kolam Budidaya B m3 1,364.52 54,900.00 74,912,148.00
3 Pek. Galian Tanah Kolam Budidaya C m3 1,069.60 54,900.00 58,721,040.00
JUMLAH 222,721,614.00
B PEKERJAAN BETON
II PEKERJAAN BETON
1 Pek. Urug pasir, t = 10 cm m3 172.64 265,300.00 45,801,392.00
2 Pek. Lantai Kerja mutu K-125, t = 5cm m3 86.32 655,000.00 56,540,910.00
3 Pek. Bekisting, 2 x pakai m2 1,743.92 191,850.00 334,571,052.00
4 Pek. Wiremesh M7, 2 lapis m2 2,441.87 54,100.00 132,105,167.00
5 Pek. Beton Readymix K-300 m3 211.91 1,379,900.00 292,414,609.00
JUMLAH 861,433,130.00
JUMLAH BIAYA KOLAM BUDIDAYA 1,084,154,744.00
ENGINEERING ESTIMATE
(EE)
#REF! #REF!
#REF!
Pekerjaan : Pembangunan Politeknik KP Pangandaran
Lokasi : Pangandaran - Jawa Barat
Thn Anggaran : 2018

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

I PEKERJAAN SITE DEVELOPMENT

1 Pekerjaan Urugan
Urugan pematangan tanah Cabluk (Site Development) m3 18,327.43 170,000.00 3,115,663,100.00
Urugan pematangan tanah Cabluk (Gd. Rektorat) m3 3,433.01 170,000.00 583,611,360.00
Urugan pematangan tanah Cabluk (Gd. Kelas) m3 2,194.34 170,000.00 373,038,480.00
Urugan pematangan tanah Cabluk (Gd. Asrama Putri) m3 1,965.80 170,000.00 334,186,680.00
Pemindahan Tanah dan Pemadatan m3 7,000.00 32,200.00 225,400,000.00
SUB JUMLAH 1 4,631,899,620.00
2 Pekerjaan Jalan Lingkungan Politeknik -
Pekerjaan Lapis Pondasi Bawah / LPB Telflord (15 cm) m3 379.09 304,300.00 115,357,239.15
Pekerjaan Lapis Pondasi Agregat Kelas A ( Lapis Pondasi Atas ), 10 cm m3 252.73 300,800.00 76,020,281.60
Pekerjaan Pemasangan Kansteen uk. 600x150x300 m1 767.09 161,000.00 123,501,490.00
SUB JUMLAH 2 314,879,010.75
3 Pekerjaan Keermir Bangunan -
Galian tanah biasa sedalam 2 meter m3 156.96 54,900.00 8,617,296.15
Pasang pondasi batu belah, 1 Pc : 4 Ps m3 408.11 719,500.00 293,631,619.45
Plesteran 1 Pc : 5 Ps, tebal 20 mm (Topian) m2 62.79 67,000.00 4,206,621.80
Urugan Tanah Kembali m3 47.09 14,800.00 696,917.94
Siaran Batu Kali m2 753.42 23,600.00 17,780,825.28
SUB JUMLAH 3 324,933,280.62
5 Pekerjaan Keermir (parit/tanggul) -
Galian tanah biasa sedalam 2 meter m3 79.00 54,900.00 4,337,100.00
Pasang pondasi batu belah, 1 Pc : 4 Ps m3 205.40 719,500.00 147,785,300.00
Plesteran 1 Pc : 5 Ps, tebal 20 mm (Topian) m2 31.60 67,000.00 2,117,200.00
Urugan Tanah Kembali m3 23.70 14,800.00 350,760.00
Pemasangan suling-suling m1 50.00 17,500.00 875,000.00
Siaran Batu Kali m2 379.20 23,600.00 8,949,120.00
SUB JUMLAH 5 164,414,480.00
JUMLAH I 5,436,126,391.37

EE SITE DEVELOPMENT Page 6


REKAPITULASI
ENGINEERING ESTIMATE
(EE)
Pekerjaan : Pembangunan Politeknik KP Pangandaran
Lokasi : Pangandaran - Jawa Barat
Thn Anggaran : 2016

JUMLAH HARGA
NO. JENIS PEKERJAAN
(Rp.)

STRUKTUR

I GEDUNG REKTORAT 5,503,798,630.08

II GEDUNG KULIAH 3,639,694,783.95

III GEDUNG ASRAMA PUTRI 4,975,556,487.47

JUMLAH 14,119,049,901.50
REKAPITULASI
ENGINEERING ESTIMATE
(EE)
Pekerjaan : Pembangunan Politeknik KP Pangandaran
Lokasi : Pangandaran - Jawa Barat
Thn Anggaran : 2018

JUMLAH HARGA
NO. JENIS PEKERJAAN
(Rp.)

GEDUNG REKTORAT
STRUKTUR
A PEKERJAAN TIANG PANCANG DAN PONDASI
I PEKERJAAN GALIAN DAN URUGAN 75,889,532.00
II PEKERJAAN TIANG PANCANG 1,115,791,600.00
III PEKERJAAN PONDASI 1,086,632,062.00
IV PEKERJAAN BETON 188,986,701.28

B STRUKTUR LANTAI DASAR


I PEKERJAAN BETON 484,694,101.56

C PEKERJAAN STRUKTUR LANTAI 1


I PEKERJAAN BETON 639,679,121.90

D PEKERJAAN STRUKTUR LANTAI 2


I PEKERJAAN BETON 641,765,700.10

E PEKERJAAN STRUKTUR LANTAI 3


I PEKERJAAN BETON 840,283,352.33

F PEKERJAAN STRUKTUR LANTAI ATAP


I PEKERJAAN BETON 287,641,693.50
II PEKERJAAN STRUKTUR ATAP 99,290,465.39

G PEKERJAAN ATAP
PEKERJAAN ATAP 43,144,300.00

JUMLAH 5,503,798,630.08
ENGINEERING ESTIMATE
(EE)
Pekerjaan : Pembangunan Politeknik KP Pangandaran
Lokasi : Pangandaran - Jawa Barat
Thn Anggaran : 2018

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

GEDUNG REKTORAT

PEKERJAAN STRUKTUR
A PEKERJAAN TIANG PANCANG DAN PONDASI
I PEKERJAAN GALIAN DAN URUGAN
1 Urugan Tanah Peninggian Bangunan (Sirtu) M3 199.50 247,600.00 49,396,200.00
2 Galian Tanah Pondasi M3 355.90 54,900.00 19,538,910.00
3 Urugan Tanah Kembali M3 101.70 14,800.00 1,505,160.00
4 Urugan Pasir di Pondasi M3 20.54 265,300.00 5,449,262.00
JUMLAH 75,889,532.00
II PEKERJAAN TIANG PANCANG
1 Tiang Pancang Spoonfile dia. 40cm Type B M1 1,848.00 533,500.00 985,908,000.00
2 Pengangkutan Tiang Pancang ke Titik Pemancangan M1 1,848.00 14,400.00 26,611,200.00
3 Pemancangan Tiang Pancang M1 1,848.00 52,800.00 97,574,400.00
4 Pemotongan Tiang Pancang BH 154.00 30,000.00 4,620,000.00
5 Penyambungan Tiang Pancang ttk 154.00 7,000.00 1,078,000.00
JUMLAH 1,115,791,600.00
III PEKERJAAN PONDASI
1 Beton Poer Type SP 3 (K-300)
- Beton K-300 M3 43.53 1,379,900.00 60,067,047.00
- Besi beton Kg 6,355.85 13,900.00 88,346,384.21
- Bekisting M2 354.94 166,400.00 59,061,504.00
2 Beton Poer Type SP 4 (K-300)
- Beton K-300 M3 76.03 1,379,900.00 104,913,797.00
- Besi beton Kg 11,882.18 13,900.00 165,162,267.01
- Bekisting M2 671.60 166,400.00 111,753,962.67
3 Beton Poer Type SP 5 (K-300)
- Beton K-300 M3 56.64 1,379,900.00 78,157,536.00
- Besi beton Kg 8,270.06 13,900.00 114,953,806.61
- Bekisting M2 461.83 166,400.00 76,849,152.00
4 Beton Poer Type SP 18 (K-300)
- Beton K-300 M3 30.40 1,379,900.00 41,948,960.00
- Besi beton Kg 4,018.04 13,900.00 55,850,795.75
- Bekisting M2 207.73 166,400.00 34,566,826.67
5 Beton Sloof Type S 25/50 (K-250) M3 4,886,100.00 -
- Beton K-250 M3 16.77 1,269,600.00 21,291,192.00
- Besi beton Kg 2,870.58 13,900.00 39,901,005.09
- Bekisting 2x pakai M2 201.24 89,950.00 18,101,538.00
6 Beton Isi Tiang Pancang K-175 M3 7.41 1,211,800.00 8,979,438.00
7 Lantai Kerja Beton K 125 M3 10.27 655,000.00 6,726,850.00
JUMLAH 1,086,632,062.00
IV PEKERJAAN BETON
1 Beton Kolom type K1 40/60 (K-300)
- Beton K-300 M3 7.46 1,379,900.00 10,294,054.00
- Besi beton Kg 1,632.68 13,900.00 22,694,209.61
- Bekisting 2x pakai M2 62.17 191,850.00 11,926,675.00
2 Beton Kolom type K2 40/60 (K-300)
- Beton K-300 M3 6.61 1,379,900.00 9,121,139.00
- Besi beton Kg 1,446.65 13,900.00 20,108,408.24
- Bekisting 2x pakai M2 55.08 191,850.00 10,567,737.50
3 Beton Kolom type K3 40/60 (K-300)
- Beton K-300 M3 2.80 1,379,900.00 3,863,720.00
- Besi beton Kg 716.66 13,900.00 9,961,583.73
- Bekisting 2x pakai M2 23.33 191,850.00 4,476,500.00
4 Beton Kolom type K4 40/60 (K-300)
- Beton K-300 M3 6.55 1,379,900.00 9,038,345.00
- Besi beton Kg 1,676.47 13,900.00 23,302,990.51
HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

- Bekisting 2x pakai M2 54.58 191,850.00 10,471,812.50


5 Beton Kolom type K5 40/60 (K-300)
- Beton K-300 M3 2.80 1,379,900.00 3,863,720.00
- Besi beton Kg 612.80 13,900.00 8,517,933.90
- Bekisting 2x pakai M2 23.33 191,850.00 4,476,500.00
6 Beton Kolom type K7 40/40 (K-300)
- Beton K-300 M3 0.62 1,379,900.00 855,538.00
- Besi beton Kg 195.92 13,900.00 2,723,353.71
- Bekisting 2x pakai M2 6.20 191,850.00 1,189,470.00
7 Beton Kolom type K8 40/40 (K-300)
- Beton K-300 M3 2.49 1,379,900.00 3,435,951.00
- Besi beton Kg 688.61 13,900.00 9,571,728.29
- Bekisting 2x pakai M2 24.90 191,850.00 4,777,065.00
8 Beton Kolom type K9 40/40 (K-300)
- Beton K-300 M3 0.62 1,379,900.00 855,538.00
- Besi beton Kg 122.54 13,900.00 1,703,258.29
- Bekisting 2x pakai M2 6.20 191,850.00 1,189,470.00
JUMLAH 188,986,701.28
B STRUKTUR LANTAI DASAR
I PEKERJAAN BETON
1 Beton Kolom type K1 40/60 (K-300)
- Beton K-300 M3 6.91 1,379,900.00 9,535,109.00
- Besi beton Kg 1,512.31 13,900.00 21,021,044.02
- Bekisting 2x pakai M2 57.58 191,850.00 11,047,362.50
2 Beton Kolom type K2 40/60 (K-300)
- Beton K-300 M3 5.18 1,379,900.00 7,147,882.00
- Besi beton Kg 1,133.68 13,900.00 15,758,177.72
- Bekisting 2x pakai M2 43.17 191,850.00 8,281,525.00
3 Beton Kolom type K3 40/60 (K-300)
- Beton K-300 M3 2.59 1,379,900.00 3,573,941.00
- Besi beton Kg 662.91 13,900.00 9,214,464.95
- Bekisting 2x pakai M2 21.58 191,850.00 4,140,762.50
4 Beton Kolom type K4 40/60 (K-300)
- Beton K-300 M3 6.04 1,379,900.00 8,334,596.00
- Besi beton Kg 1,545.94 13,900.00 21,488,559.19
- Bekisting 2x pakai M2 50.33 191,850.00 9,656,450.00
5 Beton Kolom type K5 40/60 (K-300)
- Beton K-300 M3 2.59 1,379,900.00 3,573,941.00
- Besi beton Kg 566.84 13,900.00 7,879,088.86
- Bekisting 2x pakai M2 21.58 191,850.00 4,140,762.50
6 Beton Kolom type K7 40/40 (K-300)
- Beton K-300 M3 0.57 1,379,900.00 786,543.00
- Besi beton Kg 180.12 13,900.00 2,503,728.41
- Bekisting 2x pakai M2 5.70 191,850.00 1,093,545.00
7 Beton Kolom type K8 40/40 (K-300)
- Beton K-300 M3 2.30 1,379,900.00 3,173,770.00
- Besi beton Kg 636.07 13,900.00 8,841,355.45
- Bekisting 2x pakai M2 23.00 191,850.00 4,412,550.00
8 Beton Kolom type K9 40/40 (K-300)
- Beton K-300 M3 0.57 1,379,900.00 786,543.00
- Besi beton Kg 112.65 13,900.00 1,565,898.75
- Bekisting 2x pakai M2 5.70 191,850.00 1,093,545.00
9 Beton Balok Type B1 30/60 (K-300)
- Beton K-300 M3 10.62 1,379,900.00 14,654,538.00
- Besi beton Kg 2,729.35 13,900.00 37,937,912.11
- Bekisting 2x pakai M2 106.20 200,500.00 21,293,100.00
10 Beton Balok Type B2 30/60 (K-300)
- Beton K-300 M3 8.33 1,379,900.00 11,494,567.00
- Besi beton Kg 1,934.83 13,900.00 26,894,087.71
- Bekisting 2x pakai M2 83.30 200,500.00 16,701,650.00
11 Beton Balok Type B3 30/60 (K-300) M3
- Beton K-300 M3 2.89 1,379,900.00 3,987,911.00
- Besi beton Kg 528.34 13,900.00 7,343,864.71
- Bekisting 2x pakai M2 28.90 200,500.00 5,794,450.00
HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

12 Beton Balok Type B4 30/50 (K-300)


- Beton K-300 M3 11.89 1,379,900.00 16,407,011.00
- Besi beton Kg 2,896.07 13,900.00 40,255,437.59
- Bekisting 2x pakai M2 118.90 200,500.00 23,839,450.00
13 Beton Balok Type B5 30/50 (K-300)
- Beton K-300 M3 5.34 1,379,900.00 7,368,666.00
- Besi beton Kg 1,142.22 13,900.00 15,876,800.37
- Bekisting 2x pakai M2 53.40 200,500.00 10,706,700.00
14 Beton Balok Type B6 20/40 (K-300)
- Beton K-300 M3 5.26 1,379,900.00 7,258,274.00
- Besi beton Kg 1,221.99 13,900.00 16,985,679.97
- Bekisting 2x pakai M2 78.90 200,500.00 15,819,450.00
15 Beton Tangga (K-300)
- Beton K-300 M3 4.27 1,379,900.00 5,892,173.00
- Besi beton Kg 350.99 13,900.00 4,878,816.60
- Bekisting 2x pakai M2 25.12 169,300.00 4,252,417.65
JUMLAH 484,694,101.56
C PEKERJAAN STRUKTUR LANTAI 1
I PEKERJAAN BETON
1 Beton Kolom type K1 40/60 (K-300) -
- Beton K-300 M3 6.91 1,379,900.00 9,535,109.00
- Besi beton Kg 999.68 13,900.00 13,895,600.93
- Bekisting 2x pakai M2 57.58 191,850.00 11,047,362.50
2 Beton Kolom type K2 40/60 (K-300)
- Beton K-300 M3 5.18 1,379,900.00 7,147,882.00
- Besi beton Kg 941.54 13,900.00 13,087,425.53
- Bekisting 2x pakai M2 43.17 191,850.00 8,281,525.00
3 Beton Kolom type K3 40/60 (K-300) -
- Beton K-300 M3 2.59 1,379,900.00 3,573,941.00
- Besi beton Kg 566.84 13,900.00 7,879,088.86
- Bekisting 2x pakai M2 21.58 191,850.00 4,140,762.50
4 Beton Kolom type K4 40/60 (K-300)
- Beton K-300 M3 6.05 1,379,900.00 8,348,395.00
- Besi beton Kg 1,099.68 13,900.00 15,285,506.65
- Bekisting 2x pakai M2 50.42 191,850.00 9,672,437.50
5 Beton Kolom type K5 40/60 (K-300)
- Beton K-300 M3 2.59 1,379,900.00 3,573,941.00
- Besi beton Kg 470.77 13,900.00 6,543,712.76
- Bekisting 2x pakai M2 21.58 191,850.00 4,140,762.50
6 Beton Kolom type K7 40/40 (K-300)
- Beton K-300 M3 0.57 1,379,900.00 786,543.00
- Besi beton Kg 180.12 13,900.00 2,503,728.41
- Bekisting 2x pakai M2 5.70 191,850.00 1,093,545.00
7 Beton Kolom type K8 40/40 (K-300)
- Beton K-300 M3 2.30 1,379,900.00 3,173,770.00
- Besi beton Kg 636.07 13,900.00 8,841,355.45
- Bekisting 2x pakai M2 23.00 191,850.00 4,412,550.00
8 Beton Kolom type K9 40/40 (K-300)
- Beton K-300 M3 0.57 1,379,900.00 786,543.00
- Besi beton Kg 112.65 13,900.00 1,565,898.75
- Bekisting 2x pakai M2 5.70 191,850.00 1,093,545.00
9 Beton Balok Type B1 30/60 (K-300)
- Beton K-300 M3 10.62 1,379,900.00 14,654,538.00
- Besi beton Kg 2,729.35 13,900.00 37,937,912.11
- Bekisting 2x pakai M2 106.20 200,500.00 21,293,100.00
10 Beton Balok Type B2 30/60 (K-300)
- Beton K-300 M3 8.25 1,379,900.00 11,384,175.00
- Besi beton Kg 1,916.24 13,900.00 26,635,801.16
- Bekisting 2x pakai M2 82.50 200,500.00 16,541,250.00
11 Beton Balok Type B3 30/60 (K-300)
- Beton K-300 M3 2.70 1,379,900.00 3,725,730.00
- Besi beton Kg 493.60 13,900.00 6,861,050.08
- Bekisting 2x pakai M2 27.00 200,500.00 5,413,500.00
12 Beton Balok Type B4 30/50 (K-300)
HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

- Beton K-300 M3 11.89 1,379,900.00 16,407,011.00


- Besi beton Kg 2,896.07 13,900.00 40,255,437.59
- Bekisting 2x pakai M2 118.90 200,500.00 23,839,450.00
13 Beton Balok Type B5 30/50 (K-300)
- Beton K-300 M3 2.85 1,379,900.00 3,932,715.00
- Bekisting 2x pakai Kg 609.61 13,900.00 8,473,573.23
- Bekisting M2 28.50 200,500.00 5,714,250.00
14 Beton Balok Type B6 20/40 (K-300)
- Beton K-300 M3 5.88 1,379,900.00 8,113,812.00
- Besi beton Kg 1,366.03 13,900.00 18,987,794.34
- Bekisting 2x pakai M2 88.20 200,500.00 17,684,100.00
15 Membuat Plat Lantai beton K-300, tebal = 15 cm
- Beton K-300 M3 54.49 1,379,900.00 75,190,751.00
- Besi beton Kg 2,986.05 13,900.00 41,506,122.80
- Bekisting 2x pakai M2 363.27 191,850.00 69,692,710.00
16 Beton Tangga (K-300)
- Beton K-300 M3 4.27 1,379,900.00 5,892,173.00
- Besi beton Kg 350.99 13,900.00 4,878,816.60
- Bekisting 2x pakai M2 25.12 169,300.00 4,252,417.65
JUMLAH 639,679,121.90
D PEKERJAAN STRUKTUR LANTAI 2
I PEKERJAAN BETON
1 Beton Kolom type K1 40/60 (K-300)
- Beton K-300 M3 6.91 1,379,900.00 9,535,109.00
- Besi beton Kg 999.68 13,900.00 13,895,600.93
- Bekisting 2x pakai M2 57.58 191,850.00 11,047,362.50
2 Beton Kolom type K2 40/60 (K-300)
- Beton K-300 M3 5.18 1,379,900.00 7,147,882.00
- Besi beton Kg 941.54 13,900.00 13,087,425.53
- Bekisting 2x pakai M2 43.17 191,850.00 8,281,525.00
3 Beton Kolom type K3 40/60 (K-300)
- Beton K-300 M3 2.59 1,379,900.00 3,573,941.00
- Besi beton Kg 566.84 13,900.00 7,879,088.86
- Bekisting 2x pakai M2 21.58 191,850.00 4,140,762.50
4 Beton Kolom type K4 40/60 (K-300)
- Beton K-300 M3 6.05 1,379,900.00 8,348,395.00
- Besi beton Kg 1,099.68 13,900.00 15,285,506.65
- Bekisting 2x pakai M2 50.42 191,850.00 9,672,437.50
5 Beton Kolom type K5 40/60 (K-300)
- Beton K-300 M3 2.59 1,379,900.00 3,573,941.00
- Besi beton Kg 470.77 13,900.00 6,543,712.76
- Bekisting 2x pakai M2 21.58 191,850.00 4,140,762.50
6 Beton Kolom type K7 40/40 (K-300)
- Beton K-300 M3 0.57 1,379,900.00 786,543.00
- Besi beton Kg 180.12 13,900.00 2,503,728.41
- Bekisting 2x pakai M2 5.70 191,850.00 1,093,545.00
7 Beton Kolom type K8 40/40 (K-300)
- Beton K-300 M3 2.30 1,379,900.00 3,173,770.00
- Besi beton Kg 636.07 13,900.00 8,841,355.45
- Bekisting 2x pakai M2 23.00 191,850.00 4,412,550.00
8 Beton Kolom type K9 40/40 (K-300)
- Beton K-300 M3 0.57 1,379,900.00 786,543.00
- Besi beton Kg 112.65 13,900.00 1,565,898.75
- Bekisting 2x pakai M2 5.70 191,850.00 1,093,545.00
9 Beton Balok Type B1 30/60 (K-300)
- Beton K-300 M3 10.62 1,379,900.00 14,654,538.00
- Besi beton Kg 2,729.35 13,900.00 37,937,912.11
- Bekisting 2x pakai M2 106.20 200,500.00 21,293,100.00
10 Beton Balok Type B2 30/60 (K-300)
- Beton K-300 M3 8.25 1,379,900.00 11,384,175.00
- Besi beton Kg 1,916.24 13,900.00 26,635,801.16
- Bekisting 2x pakai M2 82.50 200,500.00 16,541,250.00
11 Beton Balok Type B3 30/60 (K-300)
- Beton K-300 M3 2.70 1,379,900.00 3,725,730.00
HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

- Besi beton Kg 493.60 13,900.00 6,861,050.08


- Bekisting 2x pakai M2 27.00 200,500.00 5,413,500.00
12 Beton Balok Type B4 30/50 (K-300)
- Beton K-300 M3 11.89 1,379,900.00 16,407,011.00
- Besi beton Kg 2,896.07 13,900.00 40,255,437.59
- Bekisting 2x pakai M2 118.90 200,500.00 23,839,450.00
13 Beton Balok Type B5 30/50 (K-300)
- Beton K-300 M3 2.85 1,379,900.00 3,932,715.00
- Besi beton Kg 609.61 13,900.00 8,473,573.23
- Bekisting 2x pakai M2 28.50 200,500.00 5,714,250.00
14 Beton Balok Type B6 20/40 (K-300)
- Beton K-300 M3 5.88 1,379,900.00 8,113,812.00
- Besi beton Kg 1,366.03 13,900.00 18,987,794.34
- Bekisting 2x pakai M2 88.20 200,500.00 17,684,100.00
15 Membuat Plat Lantai beton K-300, tebal = 15 cm
- Beton K-300 M3 55.10 1,379,900.00 76,032,490.00
- Besi beton Kg 3,019.48 13,900.00 41,970,772.00
- Bekisting 2x pakai M2 367.33 191,850.00 70,472,900.00
16 Beton Tangga (K-300)
- Beton K-300 M3 4.27 1,379,900.00 5,892,173.00
- Besi beton Kg 350.99 13,900.00 4,878,816.60
- Bekisting 2x pakai M2 25.12 169,300.00 4,252,417.65
JUMLAH 641,765,700.10
E PEKERJAAN STRUKTUR LANTAI 3
I PEKERJAAN BETON
1 Beton Kolom type K1 40/60 (K-300)
- Beton K-300 M3 51.18 1,379,900.00 70,623,282.00
- Besi beton Kg 7,404.31 13,900.00 102,919,950.14
- Bekisting 2x pakai M2 426.50 191,850.00 81,824,025.00
2 Beton Kolom type K2 40/60 (K-300)
- Beton K-300 M3 3.46 1,379,900.00 4,774,454.00
- Besi beton Kg 628.91 13,900.00 8,741,793.89
- Bekisting 2x pakai M2 28.83 191,850.00 5,531,675.00
3 Beton Kolom type K3 40/60 (K-300)
- Beton K-300 M3 2.59 1,379,900.00 3,573,941.00
- Besi beton Kg 566.84 13,900.00 7,879,088.86
- Bekisting 2x pakai M2 21.58 191,850.00 4,140,762.50
4 Beton Kolom type K4 40/60 (K-300)
- Beton K-300 M3 6.05 1,379,900.00 8,348,395.00
- Besi beton Kg 1,099.68 13,900.00 15,285,506.65
- Bekisting 2x pakai M2 50.42 191,850.00 9,672,437.50
5 Beton Kolom type K5 40/60 (K-300)
- Beton K-300 M3 2.59 1,379,900.00 3,573,941.00
- Besi beton Kg 470.77 13,900.00 6,543,712.76
- Bekisting 2x pakai M2 21.58 191,850.00 4,140,762.50
6 Beton Kolom type K7 40/40 (K-300)
- Beton K-300 M3 0.57 1,379,900.00 786,543.00
- Besi beton Kg 180.12 13,900.00 2,503,728.41
- Bekisting 2x pakai M2 5.70 191,850.00 1,093,545.00
7 Beton Kolom type K8 40/40 (K-300)
- Beton K-300 M3 2.30 1,379,900.00 3,173,770.00
- Besi beton Kg 636.07 13,900.00 8,841,355.45
- Bekisting 2x pakai M2 23.00 191,850.00 4,412,550.00
8 Beton Kolom type K9 40/40 (K-300)
- Beton K-300 M3 0.57 1,379,900.00 786,543.00
- Besi beton Kg 112.65 13,900.00 1,565,898.75
- Bekisting 2x pakai M2 5.70 191,850.00 1,093,545.00
9 Beton Balok Type B1 30/60 (K-300)
- Beton K-300 M3 10.62 1,379,900.00 14,654,538.00
- Besi beton Kg 2,729.35 13,900.00 37,937,912.11
- Bekisting 2x pakai M2 106.20 200,500.00 21,293,100.00
10 Beton Balok Type B2 30/60 (K-300)
- Beton K-300 M3 8.25 1,379,900.00 11,384,175.00
- Besi beton Kg 1,916.24 13,900.00 26,635,801.16
HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

- Bekisting 2x pakai M2 82.50 200,500.00 16,541,250.00


11 Beton Balok Type B3 30/60 (K-300)
- Beton K-300 M3 2.70 1,379,900.00 3,725,730.00
- Besi beton Kg 493.60 13,900.00 6,861,050.08
- Bekisting 2x pakai M2 27.00 200,500.00 5,413,500.00
12 Beton Balok Type B4 30/50 (K-300)
- Beton K-300 M3 11.89 1,379,900.00 16,407,011.00
- Besi beton Kg 2,896.07 13,900.00 40,255,437.59
- Bekisting 2x pakai M2 118.90 200,500.00 23,839,450.00
13 Beton Balok Type B5 30/50 (K-300)
- Beton K-300 M3 2.85 1,379,900.00 3,932,715.00
- Besi beton Kg 609.61 13,900.00 8,473,573.23
- Bekisting 2x pakai M2 28.50 200,500.00 5,714,250.00
14 Beton Balok Type B6 20/40 (K-300)
- Beton K-300 M3 5.88 1,379,900.00 8,113,812.00
- Besi beton Kg 1,366.03 13,900.00 18,987,794.34
- Bekisting 2x pakai M2 88.20 200,500.00 17,684,100.00
15 Membuat Plat Lantai beton K-300, tebal = 15 cm
- Beton K-300 M3 55.72 1,379,900.00 76,888,028.00
- Besi beton Kg 3,053.46 13,900.00 42,443,038.40
- Bekisting 2x pakai M2 371.47 191,850.00 71,265,880.00
JUMLAH 840,283,352.33
F PEKERJAAN STRUKTUR LANTAI ATAP
I PEKERJAAN BETON
1 Beton Kolom type K1 40/60 (K-300)
- Beton K-300 M3 1.83 1,379,900.00 2,525,217.00
- Besi beton Kg 264.75 13,900.00 3,680,021.66
- Bekisting 2x pakai M2 15.25 191,850.00 2,925,712.50
2 Beton Kolom type K5 40/60 (K-300)
- Beton K-300 M3 1.10 1,379,900.00 1,517,890.00
- Besi beton Kg 199.94 13,900.00 2,779,183.03
- Bekisting 2x pakai M2 9.17 191,850.00 1,758,625.00
3 Beton Kolom type K7 40/40 (K-300)
- Beton K-300 M3 0.41 1,379,900.00 565,759.00
- Besi beton Kg 64.86 13,900.00 901,488.48
- Bekisting 2x pakai M2 4.10 191,850.00 786,585.00
4 Beton Kolom type K8 40/40 (K-300)
- Beton K-300 M3 1.63 1,379,900.00 2,249,237.00
- Besi beton Kg 257.84 13,900.00 3,583,966.39
- Bekisting 2x pakai M2 16.30 191,850.00 3,127,155.00
5 Beton Kolom type K9 40/40 (K-300)
- Beton K-300 M3 0.41 1,379,900.00 565,759.00
- Besi beton Kg 64.86 13,900.00 901,488.48
- Bekisting 2x pakai M2 4.10 191,850.00 786,585.00
6 Beton Balok Type B1 30/50 (K-300)
- Beton K-300 M3 13.98 1,379,900.00 19,291,002.00
- Besi beton Kg 3,592.87 13,900.00 49,940,867.35
- Bekisting 2x pakai M2 139.80 200,500.00 28,029,900.00
7 Beton Balok Type B2 30/50 (K-300)
- Beton K-300 M3 7.66 1,379,900.00 10,570,034.00
- Besi beton Kg 1,779.20 13,900.00 24,730,937.80
- Bekisting 2x pakai M2 76.60 200,500.00 15,358,300.00
8 Beton Balok Type B3 20/40 (K-300) -
- Beton K-300 M3 1.58 1,379,900.00 2,180,242.00
- Besi beton Kg 288.85 13,900.00 4,014,984.86
- Bekisting 2x pakai M2 15.80 200,500.00 3,167,900.00
9 Beton Balok Type B4 20/40 (K-300) -
- Beton K-300 M3 8.60 1,379,900.00 11,867,140.00
- Besi beton Kg 2,094.72 13,900.00 29,116,632.74
- Bekisting 2x pakai M2 86.00 200,500.00 17,243,000.00
10 Beton Plat Atap Tebal 15 cm (K-300)
- Beton K-300 M3 12.71 1,379,900.00 17,538,529.00
- Besi beton Kg 696.51 13,900.00 9,681,461.20
- Bekisting 2x pakai M2 84.73 191,850.00 16,256,090.00
HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

JUMLAH 287,641,693.50
II PEKERJAAN STRUKTUR ATAP
1 Beton Balok Type B1 30/50 (K-300)
- Beton K-300 M3 2.49 1,379,900.00 3,435,951.00
- Besi beton Kg 532.61 13,900.00 7,403,227.14
- Bekisting 2x pakai M2 26.56 200,500.00 5,325,280.00
2 Beton Balok Type B2 30/50 (K-300)
- Beton K-300 M3 6.22 1,379,900.00 8,582,978.00
- Besi beton Kg 961.30 13,900.00 13,362,057.96
- Bekisting 2x pakai M2 66.35 200,500.00 13,302,506.67
3 Beton Balok Type B3 20/40 (K-300)
- Beton K-300 M3 0.40 1,379,900.00 551,960.00
- Besi beton Kg 92.93 13,900.00 1,291,686.69
- Bekisting 2x pakai M2 4.27 200,500.00 855,466.67
4 Beton Balok Type B4 20/40 (K-300)
- Beton K-300 M3 2.36 1,379,900.00 3,256,564.00
- Besi beton Kg 408.60 13,900.00 5,679,479.54
- Bekisting 2x pakai M2 25.17 200,500.00 5,047,253.33
5 Beton Plat Atap Tebal 15 cm (K-300)
- Beton K-300 M3 9.12 1,379,900.00 12,584,688.00
- Besi beton Kg 499.78 13,900.00 6,946,886.40
- Bekisting 2x pakai M2 60.80 191,850.00 11,664,480.00
JUMLAH 99,290,465.39
G PEKERJAAN ATAP
1 Gording C 150x65x20x3.2 kg 1,965.00 13,900.00 27,313,500.00
2 Ikatan Angin Besi dia 16 waltermur BH 20.00 35,000.00 700,000.00
3 Treksing dia 12 BH 120.00 55,000.00 6,600,000.00
4 Anker dia 10 BH 96.00 35,000.00 3,360,000.00
5 Plat Alas KG 372.00 13,900.00 5,170,800.00
JUMLAH 43,144,300.00
REKAPITULASI
ENGINEERING ESTIMATE
(EE)
Pekerjaan : Pembangunan Politeknik KP Pangandaran
Lokasi : Pangandaran - Jawa Barat
Thn Anggaran : 2016

JUMLAH HARGA
NO. JENIS PEKERJAAN
(Rp.)

GEDUNG KULIAH
STRUKTUR
A PEKERJAAN TIANG PANCANG DAN PONDASI
I PEKERJAAN GALIAN DAN URUGAN 65,074,960.00
II PEKERJAAN TIANG PANCANG 768,012,400.00
III PEKERJAAN PONDASI 756,037,695.79
IV PEKERJAAN BETON (K-300) 265,607,767.20

B STRUKTUR LANTAI DASAR


I PEKERJAAN BETON 332,653,214.22

C PEKERJAAN STRUKTUR LANTAI 1


I PEKERJAAN BETON (K-300) 493,184,296.67

D PEKERJAAN STRUKTUR LANTAI 2


I PEKERJAAN BETON (K-300) 488,398,299.35

E PEKERJAAN STRUKTUR LANTAI 3 (ATAP)


I PEKERJAAN BETON (K-300) 470,726,150.71

JUMLAH 3,639,694,783.95
ENGINEERING ESTIMATE
(EE)
Pekerjaan : Pembangunan Politeknik KP Pangandaran
Lokasi : Pangandaran - Jawa Barat
Thn Anggaran : 2016

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

GEDUNG KULIAH

PEKERJAAN STRUKTUR
A PEKERJAAN TIANG PANCANG DAN PONDASI
I PEKERJAAN GALIAN DAN URUGAN
1 Urugan Tanah Peninggian Bangunan (Sirtu) M3 182.16 247,600.00 45,102,816.00
2 Galian Tandah Pondasi M3 280.86 54,900.00 15,419,214.00
3 Urugan Tanah Kembali M3 97.90 14,800.00 1,448,920.00
4 Urugan Pasir di Pondasi M3 11.70 265,300.00 3,104,010.00
JUMLAH 65,074,960.00
II PEKERJAAN TIANG PANCANG
1 Tiang Pancang Spoonfile d40 Type B M1 1,272.00 533,500.00 678,612,000.00
2 Pengangkutan Tiang Pancang ke Titik Pemancangan M1 1,272.00 14,400.00 18,316,800.00
3 Pemancangan Tiang Pancang M1 1,272.00 52,800.00 67,161,600.00
4 Pemotongan Tiang Pancang BH 106.00 30,000.00 3,180,000.00
5 Penyambungan Tiang Pancang ttk 106.00 7,000.00 742,000.00
JUMLAH 768,012,400.00
III PEKERJAAN PONDASI
1 Beton Poer Type SP 3 (K-300)
- Beton K-300 M3 42.56 1,379,900.00 58,728,544.00
- Besi beton Kg 6,214.22 13,900.00 86,377,719.09
- Bekisting M2 347.03 166,400.00 57,745,408.00
2 Beton Poer Type SP 4 (K-300)
- Beton K-300 M3 48.34 1,379,900.00 66,704,366.00
- Besi beton Kg 7,554.71 13,900.00 105,010,443.08
- Bekisting M2 427.00 166,400.00 71,053,354.67
3 Beton Poer Type SP 5 (K-300)
- Beton K-300 M3 28.32 1,379,900.00 39,078,768.00
- Besi beton Kg 4,135.03 13,900.00 57,476,903.31
- Bekisting M2 230.92 166,400.00 38,424,576.00
4 Beton Poer Type SP 6 (K-300) -
- Beton K-300 M3 20.73 1,379,900.00 28,605,327.00
- Besi beton Kg 2,778.38 13,900.00 38,619,506.78
- Bekisting M2 149.72 166,400.00 24,912,853.33
5 Beton Sloof Type S 25x50 (K-250) -
- Beton K-250 M3 14.61 1,269,600.00 18,548,856.00
- Besi beton Kg 2,500.84 13,900.00 34,761,698.53
- Bekisting 2x pakai M2 175.32 89,950.00 15,770,034.00
6 Beton Isi Tiang Pancang K-175 M3 5.41 1,211,800.00 6,555,838.00
7 Lantai Kerja Beton K 125 M3 11.70 655,000.00 7,663,500.00
JUMLAH 756,037,695.79
IV PEKERJAAN BETON (K-300)
1 Beton Kolom type K1 40/60 (K-300)
- Beton K-300 M3 1.93 1,379,900.00 2,663,207.00
- Besi beton Kg 279.22 13,900.00 3,881,115.74
- Bekisting 2x pakai M2 16.08 191,850.00 3,085,587.50
2 Beton Kolom type K2 40/60 (K-300)
- Beton K-300 M3 28.80 1,379,900.00 39,741,120.00
- Besi beton Kg 5,234.82 13,900.00 72,764,064.72
- Bekisting 2x pakai M2 240.00 191,850.00 46,044,000.00
3 Beton Kolom type K3 40/60 (K-300)
- Beton K-300 M3 0.96 1,379,900.00 1,324,704.00
- Besi beton Kg 210.10 13,900.00 2,920,434.48
- Bekisting 2x pakai M2 8.00 191,850.00 1,534,800.00
4 Beton Kolom type K4 40/60 (K-300)
- Beton K-300 M3 4.80 1,379,900.00 6,623,520.00
- Besi beton Kg 1,050.52 13,900.00 14,602,172.40
HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

- Bekisting 2x pakai M2 40.00 191,850.00 7,674,000.00


5 Beton Kolom type K5 40/60 (K-300) -
- Beton K-300 M3 4.80 1,379,900.00 6,623,520.00
- Besi beton Kg 1,228.56 13,900.00 17,077,000.68
- Bekisting 2x pakai M2 40.00 191,850.00 7,674,000.00
6 Beton Kolom type K6 40/60 (K-300)
- Beton K-300 M3 4.80 1,379,900.00 6,623,520.00
- Besi beton Kg 1,228.56 13,900.00 17,077,000.68
- Bekisting 2x pakai M2 40.00 191,850.00 7,674,000.00
JUMLAH 265,607,767.20
B STRUKTUR LANTAI DASAR
I PEKERJAAN BETON
1 Beton Kolom type K1 40/60 (K-300)
- Beton K-300 M3 1.44 1,379,900.00 1,987,056.00
- Besi beton Kg 208.33 13,900.00 2,895,754.75
- Bekisting 2x pakai M2 12.00 191,850.00 2,302,200.00
2 Beton Kolom type K2 40/60 (K-300)
- Beton K-300 M3 2.16 1,379,900.00 2,980,584.00
- Besi beton Kg 392.61 13,900.00 5,457,304.85
- Bekisting 2x pakai M2 18.00 191,850.00 3,453,300.00
3 Beton Kolom type K3 40/60 (K-300)
- Beton K-300 M3 0.72 1,379,900.00 993,528.00
- Besi beton Kg 157.58 13,900.00 2,190,325.86
- Bekisting 2x pakai M2 6.00 191,850.00 1,151,100.00
4 Beton Kolom type K4 40/60 (K-300)
- Beton K-300 M3 3.60 1,379,900.00 4,967,640.00
- Besi beton Kg 787.89 13,900.00 10,951,629.30
- Bekisting 2x pakai M2 30.00 191,850.00 5,755,500.00
5 Beton Kolom type K5 40/60 (K-300)
- Beton K-300 M3 3.60 1,379,900.00 4,967,640.00
- Besi beton Kg 921.42 13,900.00 12,807,750.51
- Bekisting 2x pakai M2 30.00 191,850.00 5,755,500.00
6 Beton Kolom type K6 40/60 (K-300)
- Beton K-300 M3 3.60 1,379,900.00 4,967,640.00
- Besi beton Kg 921.42 13,900.00 12,807,750.51
- Bekisting 2x pakai M2 30.00 191,850.00 5,755,500.00
7 Beton Balok Type B1 35/70 (K-300)
- Beton K-300 M3 21.95 1,379,900.00 30,291,564.80
- Besi beton Kg 3,657.15 13,900.00 50,834,389.67
- Bekisting 2x pakai M2 188.16 200,500.00 37,726,080.00
8 Beton Balok Type B2 30/50 (K-300)
- Beton K-300 M3 11.07 1,379,900.00 15,275,493.00
- Besi beton Kg 2,774.15 13,900.00 38,560,635.35
- Bekisting 2x pakai M2 118.08 200,500.00 23,675,040.00
9 Beton Balok Type B3 20/30 (K-300)
- Beton K-300 M3 4.03 1,379,900.00 5,560,997.00
- Besi beton Kg 981.10 13,900.00 13,637,282.63
- Bekisting 2x pakai M2 42.99 200,500.00 8,618,826.67
10 Beton Tangga (K-300)
- Beton K-300 M3 4.64 1,379,900.00 6,402,736.00
- Besi beton Kg 381.41 13,900.00 5,301,571.20
- Bekisting 2x pakai M2 27.29 169,300.00 4,620,894.12
JUMLAH 332,653,214.22
C PEKERJAAN STRUKTUR LANTAI 1
I PEKERJAAN BETON (K-300)
1 Beton Kolom type K1 40/60 (K-300)
- Beton K-300 M3 1.82 1,379,900.00 2,511,418.00
- Besi beton Kg 263.30 13,900.00 3,659,912.26
- Bekisting 2x pakai M2 15.17 191,850.00 2,909,725.00
2 Beton Kolom type K2 40/60 (K-300)
- Beton K-300 M3 2.73 1,379,900.00 3,767,127.00
- Besi beton Kg 496.22 13,900.00 6,897,426.97
- Bekisting 2x pakai M2 22.75 191,850.00 4,364,587.50
3 Beton Kolom type K3 40/60 (K-300)
HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

- Beton K-300 M3 0.91 1,379,900.00 1,255,709.00


- Besi beton Kg 199.16 13,900.00 2,768,328.52
- Bekisting 2x pakai M2 7.58 191,850.00 1,454,862.50
4 Beton Kolom type K4 40/60 (K-300)
- Beton K-300 M3 4.56 1,379,900.00 6,292,344.00
- Besi beton Kg 997.99 13,900.00 13,872,063.78
- Bekisting 2x pakai M2 38.00 191,850.00 7,290,300.00
5 Beton Kolom type K5 40/60 (K-300)
- Beton K-300 M3 4.56 1,379,900.00 6,292,344.00
- Besi beton Kg 1,167.13 13,900.00 16,223,150.65
- Bekisting 2x pakai M2 38.00 191,850.00 7,290,300.00
6 Beton Kolom type K6 40/60 (K-300)
- Beton K-300 M3 4.56 1,379,900.00 6,292,344.00
- Besi beton Kg 1,167.13 13,900.00 16,223,150.65
- Bekisting 2x pakai M2 38.00 191,850.00 7,290,300.00
7 Beton Balok Type B1 35/70 (K-300)
- Beton K-300 M3 21.95 1,379,900.00 30,291,564.80
- Besi beton Kg 3,657.15 13,900.00 50,834,389.67
- Bekisting 2x pakai M2 188.16 200,500.00 37,726,080.00
8 Beton Balok Type B2 30/50 (K-300)
- Beton K-300 M3 11.07 1,379,900.00 15,275,493.00
- Besi beton Kg 2,774.15 13,900.00 38,560,635.35
- Bekisting 2x pakai M2 118.08 200,500.00 23,675,040.00
9 Beton Balok Type B3 20/40 (K-300)
- Beton K-300 M3 4.03 1,379,900.00 5,560,997.00
- Besi beton Kg 981.10 13,900.00 13,637,282.63
- Bekisting 2x pakai M2 42.99 200,500.00 8,618,826.67
10 Beton Plat Lantai Tebal 15cm (K-300)
- Beton K-300 M3 40.28 1,379,900.00 55,582,372.00
- Besi beton Kg 2,207.34 13,900.00 30,682,081.60
- Bekisting 2x pakai M2 268.53 191,850.00 51,518,120.00
11 Beton Tangga (K-300)
- Beton K-300 M3 4.14 1,379,900.00 5,712,786.00
- Besi beton Kg 340.31 13,900.00 4,730,281.20
- Bekisting 2x pakai M2 24.35 169,300.00 4,122,952.94
JUMLAH 493,184,296.67
D PEKERJAAN STRUKTUR LANTAI 2
I PEKERJAAN BETON (K-300)
1 Beton Kolom type K1 40/60
- Beton K-300 M3 1.82 1,379,900.00 2,511,418.00
- Besi beton Kg 263.30 13,900.00 3,659,912.26
- Bekisting 2x pakai M2 15.17 191,850.00 2,909,725.00
2 Beton Kolom type K2 40/60
- Beton K-300 M3 2.73 1,379,900.00 3,767,127.00
- Besi beton Kg 496.22 13,900.00 6,897,426.97
- Bekisting 2x pakai M2 22.75 191,850.00 4,364,587.50
3 Beton Kolom type K3 40/60
- Beton K-300 M3 0.98 1,379,900.00 1,352,302.00
- Besi beton Kg 178.13 13,900.00 2,475,999.42
- Bekisting 2x pakai M2 8.17 191,850.00 1,566,775.00
4 Beton Kolom type K4 40/60
- Beton K-300 M3 4.56 1,379,900.00 6,292,344.00
- Besi beton Kg 828.85 13,900.00 11,520,976.91
- Bekisting 2x pakai M2 38.00 191,850.00 7,290,300.00
5 Beton Kolom type K5 40/60 -
- Beton K-300 M3 4.56 1,379,900.00 6,292,344.00
- Besi beton Kg 997.99 13,900.00 13,872,063.78
- Bekisting 2x pakai M2 38.00 191,850.00 7,290,300.00
6 Beton Kolom type K6 40/60
- Beton K-300 M3 4.56 1,379,900.00 6,292,344.00
- Besi beton Kg 1,167.13 13,900.00 16,223,150.65
- Bekisting 2x pakai M2 38.00 191,850.00 7,290,300.00
7 Beton Balok Type B1 35/70
- Beton K-300 M3 21.95 1,379,900.00 30,291,564.80
HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

- Besi beton Kg 3,657.15 13,900.00 50,834,389.67


- Bekisting 2x pakai M2 188.16 200,500.00 37,726,080.00
8 Beton Balok Type B2 30/50
- Beton K-300 M3 11.07 1,379,900.00 15,275,493.00
- Besi beton Kg 2,774.15 13,900.00 38,560,635.35
- Bekisting 2x pakai M2 118.08 200,500.00 23,675,040.00
9 Beton Balok Type B3 20/40
- Beton K-300 M3 4.03 1,379,900.00 5,560,997.00
- Besi beton Kg 981.10 13,900.00 13,637,282.63
- Bekisting 2x pakai M2 42.99 200,500.00 8,618,826.67
10 Beton Plat Lantai Tebal 15 cm
- Beton K-300 M3 40.28 1,379,900.00 55,582,372.00
- Besi beton Kg 2,207.34 13,900.00 30,682,081.60
- Bekisting 2x pakai M2 268.53 191,850.00 51,518,120.00
11 Beton Tangga
- Beton K-300 M3 4.14 1,379,900.00 5,712,786.00
- Besi beton Kg 340.31 13,900.00 4,730,281.20
- Bekisting 2x pakai M2 24.35 169,300.00 4,122,952.94
JUMLAH 488,398,299.35
E PEKERJAAN STRUKTUR LANTAI 3 (ATAP)
I PEKERJAAN BETON (K-300)
1 Beton Kolom type K1 40/60
- Beton K-300 M3 1.82 1,379,900.00 2,511,418.00
- Besi beton Kg 263.30 13,900.00 3,659,912.26
- Bekisting 2x pakai M2 15.17 191,850.00 2,909,725.00
2 Beton Kolom type K2 40/60
- Beton K-300 M3 2.73 1,379,900.00 3,767,127.00
- Besi beton Kg 496.22 13,900.00 6,897,426.97
- Bekisting 2x pakai M2 22.75 191,850.00 4,364,587.50
3 Beton Kolom type K3 40/60
- Beton K-300 M3 0.98 1,379,900.00 1,352,302.00
- Besi beton Kg 178.13 13,900.00 2,475,999.42
- Bekisting 2x pakai M2 8.17 191,850.00 1,566,775.00
4 Beton Kolom type K4 40/60
- Beton K-300 M3 4.56 1,379,900.00 6,292,344.00
- Besi beton Kg 828.85 13,900.00 11,520,976.91
- Bekisting 2x pakai M2 38.00 191,850.00 7,290,300.00
5 Beton Kolom type K5 40/60
- Beton K-300 M3 4.56 1,379,900.00 6,292,344.00
- Besi beton Kg 997.99 13,900.00 13,872,063.78
- Bekisting 2x pakai M2 38.00 191,850.00 7,290,300.00
6 Beton Kolom type K6 40/60
- Beton K-300 M3 4.56 1,379,900.00 6,292,344.00
- Besi beton Kg 1,167.13 13,900.00 16,223,150.65
- Bekisting 2x pakai M2 38.00 191,850.00 7,290,300.00
7 Beton Balok Type B1 35/70
- Beton K-300 M3 21.95 1,379,900.00 30,291,564.80
- Besi beton Kg 3,657.15 13,900.00 50,834,389.67
- Bekisting 2x pakai M2 188.16 200,500.00 37,726,080.00
8 Beton Balok Type B2 30/50
- Beton K-300 M3 11.07 1,379,900.00 15,275,493.00
- Besi beton Kg 2,774.15 13,900.00 38,560,635.35
- Bekisting 2x pakai M2 118.08 200,500.00 23,675,040.00
9 Beton Balok Type B3 20/40
- Beton K-300 M3 3.58 1,379,900.00 4,940,042.00
- Besi beton Kg 871.55 13,900.00 12,114,509.14
- Bekisting 2x pakai M2 38.19 200,500.00 7,656,426.67
10 Beton Plat Lantai Tebal 15 cm
- Beton K-300 M3 40.28 1,379,900.00 55,582,372.00
- Besi beton Kg 2,207.34 13,900.00 30,682,081.60
- Bekisting 2x pakai M2 268.53 191,850.00 51,518,120.00
JUMLAH 470,726,150.71
REKAPITULASI
ENGINEERING ESTIMATE
(EE)
Pekerjaan : Pembangunan Politeknik KP Pangandaran
Lokasi : Pangandaran - Jawa Barat
Thn Anggaran : 2016

JUMLAH HARGA
NO. JENIS PEKERJAAN
(Rp.)

ASRAMA PUTRI
STRUKTUR
A PEKERJAAN TIANG PANCANG DAN PONDASI
I PEKERJAAN GALIAN DAN URUGAN 313,574,365.00
II PEKERJAAN TIANG PANCANG 1,108,546,200.00
III PEKERJAAN PONDASI 1,028,317,935.49
IV PEKERJAAN BETON 196,501,166.11

B STRUKTUR LANTAI DASAR


I PEKERJAAN BETON 502,118,519.00

C PEKERJAAN STRUKTUR LANTAI 1


I PEKERJAAN BETON 687,275,702.18

D PEKERJAAN STRUKTUR LANTAI 2


I PEKERJAAN BETON 687,310,885.80

E PEKERJAAN STRUKTUR LANTAI ATAP


I PEKERJAAN BETON 451,911,713.89

4,975,556,487.47
ENGINEERING ESTIMATE
(EE)
Pekerjaan : Pembangunan Politeknik KP Pangandaran
Lokasi : Pangandaran - Jawa Barat
Thn Anggaran : 2016

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

ASRAMA PUTRI

PEKERJAAN STRUKTUR
A PEKERJAAN TIANG PANCANG DAN PONDASI
I PEKERJAAN GALIAN DAN URUGAN
1 Urugan Tanah Peninggian Bangunan (Sirtu) M3 1,133.60 247,600.00 280,679,360.00
2 Galian Tandah Pondasi M3 449.20 54,900.00 24,661,080.00
3 Urugan Tanah Kembali M3 237.09 14,800.00 3,508,932.00
4 Urugan Pasir di Pondasi M3 17.81 265,300.00 4,724,993.00
JUMLAH 313,574,365.00
II PEKERJAAN TIANG PANCANG
1 Tiang Pancang Spoonfile dia. 40cm Type B M1 1,836.00 533,500.00 979,506,000.00
2 Pengangkutan Tiang Pancang ke Titik Pemancangan M1 1,836.00 14,400.00 26,438,400.00
3 Pemancangan Tiang Pancang M1 1,836.00 52,800.00 96,940,800.00
4 Pemotongan Tiang Pancang BH 153.00 30,000.00 4,590,000.00
5 Penyambungan Tiang Pancang ttk 153.00 7,000.00 1,071,000.00
JUMLAH 1,108,546,200.00
III PEKERJAAN PONDASI
1 Beton Poer Type SP 2
- Beton K-300 M3 40.32 1,379,900.00 55,637,568.00
- Besi beton Kg 6,510.12 13,900.00 90,490,690.68
- Bekisting M2 551.04 166,400.00 91,693,056.00
2 Beton Poer Type SP 3
- Beton K-300 M3 145.02 1,379,900.00 200,113,098.00
- Besi beton Kg 21,174.50 13,900.00 294,325,583.24
- Bekisting M2 1,182.47 166,400.00 196,763,136.00
3 Beton Sloof Type S 25/50
- Beton K-250 M3 17.64 1,269,600.00 22,395,744.00
- Besi beton Kg 3,019.50 13,900.00 41,971,003.56
- Bekisting 2x pakai M2 211.68 89,950.00 19,040,616.00
4 Beton Isi Tiang Pancang K-175 M3 8.30 1,211,800.00 10,057,940.00
5 Lantai Kerja Beton K 125 M3 8.90 655,000.00 5,829,500.00
JUMLAH 1,028,317,935.49
IV PEKERJAAN BETON
1 Beton Kolom type K1 30/60
- Beton K-300 M3 5.76 1,379,900.00 7,948,224.00
- Besi beton Kg 1,038.22 13,900.00 14,431,242.43
- Bekisting 2x pakai M2 57.60 191,850.00 11,050,560.00
2 Beton Kolom type K2 30/60
- Beton K-300 M3 25.92 1,379,900.00 35,767,008.00
- Besi beton Kg 5,581.05 13,900.00 77,576,611.68
- Bekisting 2x pakai M2 259.20 191,850.00 49,727,520.00
JUMLAH 196,501,166.11
B STRUKTUR LANTAI DASAR
I PEKERJAAN BETON
1 Beton Kolom type K1 30/60
- Beton K-300 M3 5.76 1,379,900.00 7,948,224.00
- Besi beton Kg 1,038.22 13,900.00 14,431,242.43
- Bekisting 2x pakai M2 57.60 191,850.00 11,050,560.00
2 Beton Kolom type K2 30/60
- Beton K-300 M3 25.92 1,379,900.00 35,767,008.00
- Besi beton Kg 5,581.05 13,900.00 77,576,611.68
- Bekisting 2x pakai M2 259.20 191,850.00 49,727,520.00
3 Beton Balok Type B1 25/50
- Beton K-300 M3 34.16 1,379,900.00 47,137,384.00
- Besi beton Kg 10,160.29 13,900.00 141,228,079.88
- Bekisting 2x pakai M2 409.92 200,500.00 82,188,960.00
HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

4 Beton Balok Type B2 20/40 8,183,600.00 -


- Beton K-300 M3 1.63 1,379,900.00 2,249,237.00
- Besi beton Kg 410.83 13,900.00 5,710,600.56
- Bekisting 2x pakai M2 24.45 200,500.00 4,902,225.00
5 Beton Tangga -
- Beton K-300 M3 6.31 1,379,900.00 8,707,169.00
- Besi beton Kg 518.68 13,900.00 7,209,679.80
- Bekisting 2x pakai M2 37.12 169,300.00 6,284,017.65
JUMLAH 502,118,519.00
C PEKERJAAN STRUKTUR LANTAI 1
I PEKERJAAN BETON
1 Beton Kolom type K1 30/60
- Beton K-300 M3 5.76 1,379,900.00 7,948,224.00
- Besi beton Kg 1,038.22 13,900.00 14,431,242.43
- Bekisting 2x pakai M2 57.60 191,850.00 11,050,560.00
2 Beton Kolom type K2 30/60
- Beton K-300 M3 25.92 1,379,900.00 35,767,008.00
- Besi beton Kg 5,581.05 13,900.00 77,576,611.68
- Bekisting 2x pakai M2 259.20 191,850.00 49,727,520.00
3 Beton Balok Type B1 25x50
- Beton K-300 M3 34.16 1,379,900.00 47,137,384.00
- Besi beton Kg 10,160.29 13,900.00 141,228,079.88
- Bekisting 2x pakai M2 409.92 200,500.00 82,188,960.00
4 Beton Balok Type B2 20x40
- Beton K-300 M3 1.63 1,379,900.00 2,249,237.00
- Besi beton Kg 410.83 13,900.00 5,710,600.56
- Bekisting 2x pakai M2 24.45 200,500.00 4,902,225.00
5 Beton Plat Lantai t=15 cm
- Beton K-300 M3 54.14 1,379,900.00 74,707,786.00
- Besi beton Kg 2,966.87 13,900.00 41,239,520.80
- Bekisting 2x pakai M2 360.93 191,850.00 69,245,060.00
6 Beton Tangga
- Beton K-300 M3 6.30 1,379,900.00 8,693,370.00
- Besi beton Kg 517.86 13,900.00 7,198,254.00
- Bekisting 2x pakai M2 37.06 169,300.00 6,274,058.82
JUMLAH 687,275,702.18
D PEKERJAAN STRUKTUR LANTAI 2
I PEKERJAAN BETON
1 Beton Kolom type K1 30x60
- Beton K-300 M3 5.76 1,379,900.00 7,948,224.00
- Besi beton Kg 1,038.22 13,900.00 14,431,242.43
- Bekisting 2x pakai M2 57.60 191,850.00 11,050,560.00
2 Beton Kolom type K2 30x60
- Beton K-300 M3 25.92 1,379,900.00 35,767,008.00
- Besi beton Kg 5,581.05 13,900.00 77,576,611.68
- Bekisting 2x pakai M2 259.20 191,850.00 49,727,520.00
3 Beton Balok Type B1 25x50
- Beton K-300 M3 34.16 1,379,900.00 47,137,384.00
- Besi beton Kg 10,160.29 13,900.00 141,228,079.88
- Bekisting 2x pakai M2 409.92 200,500.00 82,188,960.00
4 Beton Balok Type B2 20x40
- Beton K-300 M3 1.63 1,379,900.00 2,249,237.00
- Besi beton Kg 410.83 13,900.00 5,710,600.56
- Bekisting 2x pakai M2 24.45 200,500.00 4,902,225.00
5 Beton Plat Lantai t=15 cm
- Beton K-300 M3 54.14 1,379,900.00 74,707,786.00
- Besi beton Kg 2,966.87 13,900.00 41,239,520.80
- Bekisting 2x pakai M2 360.93 191,850.00 69,245,060.00
6 Beton Tangga
- Beton K-300 M3 6.31 1,379,900.00 8,707,169.00
- Besi beton Kg 518.68 13,900.00 7,209,679.80
- Bekisting 2x pakai M2 37.12 169,300.00 6,284,017.65
JUMLAH 687,310,885.80
E PEKERJAAN STRUKTUR LANTAI ATAP
HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

I PEKERJAAN BETON
1 Kolom Atap 30/30
- Beton K-300 M3 2.52 1,379,900.00 3,477,348.00
- Besi beton Kg 662.63 13,900.00 9,210,565.90
- Bekisting 2x pakai M2 33.60 191,850.00 6,446,160.00
2 Beton Balok Type B1 25/50
- Beton K-300 M3 21.90 1,379,900.00 30,219,810.00
- Besi beton Kg 6,513.77 13,900.00 90,541,421.24
- Bekisting 2x pakai M2 262.80 200,500.00 52,691,400.00
3 Beton Balok Type B2 20/40
- Beton K-300 M3 1.63 1,379,900.00 2,249,237.00
- Besi beton Kg 410.83 13,900.00 5,710,600.56
- Bekisting 2x pakai M2 24.45 200,500.00 4,902,225.00
4 Plat Atap +12.100
- Beton K-300 M3 55.61 1,379,900.00 76,736,239.00
- Besi beton Kg 3,047.43 13,900.00 42,359,249.20
- Bekisting 2x pakai M2 370.73 191,850.00 71,125,190.00
5 Balok RB 20/40
- Beton K-300 M3 2.74 1,379,900.00 3,780,926.00
- Besi beton Kg 474.39 13,900.00 6,593,972.00
- Bekisting 2x pakai M2 41.10 200,500.00 8,240,550.00
6 Plat Atap + 1590
- Beton K-300 M3 11.00 1,379,900.00 15,178,900.00
- Besi beton Kg 602.80 13,900.00 8,378,920.00
- Bekisting 2x pakai M2 73.33 191,850.00 14,069,000.00
JUMLAH 451,911,713.89
REKAPITULASI
ENGINEERING ESTIMATE
(EE)

Pekerjaan : Pembangunan Politeknik KP Pangandaran


Lokasi : Pangandaran - Jawa Barat
Thn Anggaran : 2016

JUMLAH HARGA
NO. JENIS PEKERJAAN (Rp.)

GEDUNG FLAT DOSEN


STRUKTUR
A PEKERJAAN TIANG PANCANG DAN PONDASI
I PEKERJAAN GALIAN DAN URUGAN -
II PEKERJAAN TIANG PANCANG 1,383,871,400.00
III PEKERJAAN PONDASI -
IV PEKERJAAN BETON -

B STRUKTUR LANTAI DASAR


I PEKERJAAN BETON -

C PEKERJAAN STRUKTUR LANTAI 1


I PEKERJAAN BETON -

D PEKERJAAN STRUKTUR LANTAI 2


I PEKERJAAN BETON -

E PEKERJAAN STRUKTUR LANTAI 3


I PEKERJAAN BETON -

JUMLAH 1,383,871,400.00
ENGINEERING ESTIMATE

(EE)

Pekerjaan : Pembangunan Politeknik KP Pangandaran


Lokasi : Pangandaran - Jawa Barat
Thn Anggaran : 2016

HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

GEDUNG FLAT DOSEN

PEKERJAAN STRUKTUR
A PEKERJAAN TIANG PANCANG DAN PONDASI
I PEKERJAAN GALIAN DAN URUGAN
1 Urugan Tanah Peninggian Bangunan M3 2,742.00 247,600.00 0
2 Galian Tandah Pondasi M3 435.20 54,900.00 0
3 Urugan Tanah Kembali M3 188.01 14,800.00 0
4 Urugan Pasir di Pondasi M3 24.15 265,300.00 0
JUMLAH -
II PEKERJAAN TIANG PANCANG
1 Tiang Pancang Spoonfile d40 Type B M1 2,292.00 533,500.00 1,222,782,000.00
2 Pengangkutan Tiang Pancang ke Titik Pemancangan M1 2,292.00 14,400.00 33,004,800.00
3 Pemancangan Tiang Pancang M1 2,292.00 52,800.00 121,017,600.00
4 Pemotongan Tiang Pancang BH 191.00 30,000.00 5,730,000.00
5 Penyambungan Tiang Pancang ttk 191.00 7,000.00 1,337,000.00
JUMLAH 1,383,871,400.00
III PEKERJAAN PONDASI
1 Beton Poer Type SP 3 M3 72.54 4,888,700.00 0
2 Beton Poer Type SP4 M3 27.64 5,157,300.00 0
3 Beton Poer Type SP 5 M3 90.40 4,670,100.00 0
4 Beton Poer Type SP 6 M3 20.73 4,551,000.00 0
5 Beton Sloof Type S 25x50 M3 23.31 - 0
6 Beton Isi Tiang Pancang M3 9.83 1,211,800.00 0
7 Lantai Kerja Beton K 125 M3 12.10 655,000.00 0
JUMLAH -
IV PEKERJAAN BETON
1 Beton Kolom type K1 50/50 M3 6.00 5,563,400.00 0
2 Beton Kolom type K2 50/50 M3 16.00 6,083,100.00 0
3 Beton Kolom type K3 50/50 M3 6.00 6,602,800.00 0
4 Beton Kolom type K4 50/50 M3 6.00 7,122,500.00 0
5 Beton Kolom type K5 50/50 M3 2.00 7,642,200.00 0
JUMLAH -
B STRUKTUR LANTAI DASAR
I PEKERJAAN BETON
1 Beton Kolom type K1 50/50 M3 4.50 5,563,400.00 0
2 Beton Kolom type K2 50/50 M3 12.00 6,083,100.00 0
3 Beton Kolom type K3 50/50 M3 4.50 6,602,800.00 0
4 Beton Kolom type K4 50/50 M3 4.50 7,122,500.00 0
5 Beton Kolom type K5 50/50 M3 9.00 7,642,200.00 0
6 Beton Balok Type B1 25x50 M3 46.50 8,606,200.00 0
7 Beton Balok Type B2 20x40 M3 8.25 7,319,900.00 0
8 Beton Plat Lantai t=15 cm M3 74.37 - 0
9 Beton Tangga M3 4.12 - 0
JUMLAH -
C PEKERJAAN STRUKTUR LANTAI 1
I PEKERJAAN BETON
1 Beton Kolom type K1 50/50 M3 5.70 5,563,400.00 0
2 Beton Kolom type K2 50/50 M3 15.20 6,083,100.00 0
3 Beton Kolom type K3 50/50 M3 5.70 6,602,800.00 0
4 Beton Kolom type K4 50/50 M3 5.70 7,122,500.00 0
5 Beton Kolom type K5 50/50 M3 1.90 7,642,200.00 0
6 Beton Balok Type B1 25x50 M3 46.65 8,606,200.00 0
7 Beton Balok Type B2 20x40 M3 8.20 7,319,900.00 0
8 Beton Plat Lantai t=15 cm M3 74.37 - 0
9 Beton Tangga M3 4.12 - 0
JUMLAH -
HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

D PEKERJAAN STRUKTUR LANTAI 2


I PEKERJAAN BETON
1 Beton Kolom type K1 50/50 M3 5.70 5,563,400.00 0
2 Beton Kolom type K2 50/50 M3 15.20 6,083,100.00 0
3 Beton Kolom type K3 50/50 M3 5.70 6,602,800.00 0
4 Beton Kolom type K4 50/50 M3 5.70 7,122,500.00 0
5 Beton Kolom type K5 50/50 M3 1.90 7,642,200.00 0
6 Beton Balok Type B1 25x50 M3 46.65 8,606,200.00 0
7 Beton Balok Type B2 20x40 M3 8.20 7,319,900.00 0
8 Beton Plat Lantai t=15 cm M3 74.37 - 0
9 Beton Tangga M3 4.12 - 0
JUMLAH -
E PEKERJAAN STRUKTUR LANTAI 3
I PEKERJAAN BETON
1 Beton Kolom type K1 45/45 M3 1.82 5,563,400.00 0
2 Beton Kolom type K2 45/45 M3 4.86 6,083,100.00 0
3 Beton Kolom type K3 45/45 M3 1.82 6,602,800.00 0
4 Beton Kolom type K4 45/45 M3 1.82 7,122,500.00 0
5 Beton Kolom type K5 45/45 M3 0.61 7,642,200.00 0
6 Beton Balok Type B1 25x50 M3 44.89 8,606,200.00 0
7 Beton Balok Type B2 20x40 M3 7.14 7,319,900.00 0
8 Beton Plat Lantai Tebal 15 cm M3 37.21 - 0
9 Balok Type RB 20x40 M2 8.46 7,031,900.00 0
10 Beton Plat Atap El + 12.20 M1 18.13 - 0
JUMLAH -
REKAPITULASI
ENGINEERING ESTIMATE
(EE)

Pekerjaan : Pembangunan Politeknik KP Pangandaran


Lokasi : Pangandaran - Jawa Barat
Thn Anggaran : 2016

JUMLAH HARGA
NO. JENIS PEKERJAAN (Rp.)

ASRAMA PUTRA
STRUKTUR
A PEKERJAAN TIANG PANCANG DAN PONDASI
I PEKERJAAN GALIAN DAN URUGAN -
II PEKERJAAN TIANG PANCANG 1,108,546,200.00
III PEKERJAAN PONDASI -
IV PEKERJAAN BETON -

B STRUKTUR LANTAI DASAR


I PEKERJAAN BETON -

C PEKERJAAN STRUKTUR LANTAI 1


I PEKERJAAN BETON -

D PEKERJAAN STRUKTUR LANTAI 2


I PEKERJAAN BETON -

E PEKERJAAN STRUKTUR LANTAI ATAP


I PEKERJAAN BETON -

JUMLAH 1,108,546,200.00
ENGINEERING ESTIMATE

(EE)

Pekerjaan : Pembangunan Politeknik KP Pangandaran


Lokasi : Pangandaran - Jawa Barat
Thn Anggaran : 2016

HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

ASRAMA PUTRA

PEKERJAAN STRUKTUR
A PEKERJAAN TIANG PANCANG DAN PONDASI
I PEKERJAAN GALIAN DAN URUGAN
1 Urugan Tanah Peninggian Bangunan M3 1,133.60 247,600.00 -
2 Galian Tandah Pondasi M3 449.20 54,900.00 -
3 Urugan Tanah Kembali M3 237.09 14,800.00 -
4 Urugan Pasir di Pondasi M3 17.81 265,300.00 -
JUMLAH -
II PEKERJAAN TIANG PANCANG
1 Tiang Pancang Spoonfile dia. 40cm Type B M1 1,836.00 533,500.00 979,506,000.00
2 Pengangkutan Tiang Pancang ke Titik Pemancangan M1 1,836.00 14,400.00 26,438,400.00
3 Pemancangan Tiang Pancang M1 1,836.00 52,800.00 96,940,800.00
4 Pemotongan Tiang Pancang BH 153.00 30,000.00 4,590,000.00
5 Penyambungan Tiang Pancang ttk 153.00 7,000.00 1,071,000.00
JUMLAH 1,108,546,200.00
III PEKERJAAN PONDASI
1 Beton Poer Type SP 2 M3 40.32 - -
2 Beton Poer Type SP 3 M3 145.02 - -
3 Beton Sloof Type S 25x50 M3 17.64 - -
4 Beton Isi Tiang Pancang M3 8.30 1,211,800.00 -
5 Lantai Kerja Beton K 125 M3 8.90 655,000.00 -
JUMLAH -
IV PEKERJAAN BETON
1 Beton Kolom type K1 30/60 M3 5.76 - -
2 Beton Kolom type K2 30/60 M3 25.92 - -
JUMLAH -
B STRUKTUR LANTAI DASAR
I PEKERJAAN BETON
1 Beton Kolom type K1 30/60 M3 5.76 - -
2 Beton Kolom type K2 30/60 M3 25.92 - -
3 Beton Balok Type B1 25x50 M3 34.16 - -
4 Beton Balok Type B2 20x40 M3 1.63 8,183,600.00 -
5 Beton Tangga M3 6.31 - -
JUMLAH -
C PEKERJAAN STRUKTUR LANTAI 1
I PEKERJAAN BETON
1 Beton Kolom type K1 30/60 M3 5.76 - -
2 Beton Kolom type K2 30/60 M3 25.92 - -
3 Beton Balok Type B1 25x50 M3 34.16 - -
4 Beton Balok Type B2 20x40 M3 1.63 - -
5 Beton Plat Lantai t=15 cm M3 54.14 - -
6 Beton Tangga M3 6.30 - -
JUMLAH -
D PEKERJAAN STRUKTUR LANTAI 2
I PEKERJAAN BETON
1 Beton Kolom type K1 30x60 M3 5.76 - -
2 Beton Kolom type K2 30x60 M3 25.90 - -
3 Beton Balok Type B1 25x50 M3 34.16 - -
4 Beton Balok Type B2 20x40 M3 1.63 - -
5 Beton Plat Lantai t=15 cm M3 54.14 - -
6 Beton Tangga M3 6.31 - -
JUMLAH -
E PEKERJAAN STRUKTUR LANTAI ATAP
I PEKERJAAN BETON
1 Kolom Atap 30/30 M3 2.52 - -
HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

2 Beton Balok Type B1 25x50 M3 21.90 - -


3 Beton Balok Type B2 20x40 M3 1.63 - -
4 Plat Atap T12.100 M3 55.61 - -
5 Balok RB 20x40 M3 2.74 - -
6 Plat Atap + 1590 M3 11.00 - -
JUMLAH -
REKAPITULASI
ENGINEERING ESTIMATE
(EE)
Pekerjaan : Pembangunan Politeknik KP Pangandaran
Lokasi : Pangandaran - Jawa Barat
Thn Anggaran : 2018

JUMLAH HARGA
NO. JENIS PEKERJAAN
(Rp.)

ARSITEKTUR

I GEDUNG REKTORAT 4,839,519,363.38

II GEDUNG KULIAH 4,191,870,057.14

III GEDUNG ASRAMA PUTRI 3,259,681,781.65

JUMLAH 12,291,071,202.16
REKAPITULASI
ENGINEERING ESTIMATE
(EE)
Pekerjaan : Pembangunan Politeknik KP Pangandaran
Lokasi : Pangandaran - Jawa Barat
Thn Anggaran : 2018

JUMLAH HARGA
NO. JENIS PEKERJAAN
(Rp.)

GEDUNG REKTORAT
ARSITEKTUR
I LANTAI DASAR
A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding 100,723,864.00
2 Pekerjaan Finishing 946,157,017.25
B FINISHING EXTERIOR 5,589,810.00

II PEKERJAAN LANTAI 1
A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding 240,745,665.52
2 Pekerjaan Finishing 928,815,448.17
B FINISHING EXTERIOR 10,962,540.00

III PEKERJAAN LANTAI 2


A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding 202,346,637.79
2 Pekerjaan Finishing 769,123,381.06
B FINISHING EXTERIOR 10,962,540.00

IV PEKERJAAN LANTAI 3
A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding 236,443,407.79
2 Pekerjaan Finishing 866,846,033.05
B FINISHING EXTERIOR 10,962,540.00

V LANTAI DAK ATAP


A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding 61,252,448.74
2 Pekerjaan Finishing 427,091,710.00
B FINISHING EXTERIOR 21,496,320.00

JUMLAH 4,839,519,363.38
ENGINEERING ESTIMATE
(EE)
Pekerjaan : Pembangunan Politeknik KP Pangandaran
Lokasi : Pangandaran - Jawa Barat
Thn Anggaran : 2018

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

GEDUNG REKTORAT
I LANTAI DASAR
A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding
1 Pasangan dinding bata merah ukuran tebal ½ bata, campuran spesi 1 Pc : 4 Ps m2 287.80 112,900.00 32,492,281.30
2 Plesteran 1 Pc : 5 Ps, tebal 20 mm m2 575.59 46,100.00 26,534,883.40
3 Pek. Acian m2 575.59 20,900.00 12,029,914.60
4 Plesteran + acian kolom, balok, dinding, lisplank beton struktur m2 189.44 67,000.00 12,692,480.00
5 Kolom praktis + ring balok ukuran 12 x 12 Cm m3 1.81 9,370,200.00 16,974,304.70
Sub Jumlah 1.A.1 100,723,864.00
2 Pekerjaan Finishing
1 Hall/Lobby, Receptionist dan prefunction space (as 1-8/a-e)
Pekerjaan Lantai
1 Plat lantai t=15cm, k-250 m3 81.75 3,475,800.00 284,146,650.00
2 Pasangan Floor hardener m2 350.00 89,400.00 31,290,000.00
3 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 195.00 343,700.00 67,021,500.00
Pekerjaan Dinding -
1 Cat dinding dan Kolom, acrylic emulsi m2 318.60 40,600.00 12,935,160.00
Pekerjaan Plafond -
1 Plafond gypsum 9 mm, rangka metal furing m2 350.00 100,900.00 35,315,000.00
2 List Plafond m1 118.00 26,900.00 3,174,200.00
3 Cat plafond, acrylic emulsi m2 350.00 40,400.00 14,140,000.00
Perlengkapan -
1 Meja Receptionist m1 6.50 2,758,000.00 17,927,000.00
2 Backdrop Receptionist m2 32.40 850,000.00 27,540,000.00
Pekerjaan Pintu dan jendela -
1 Jendela type J5 unit 2.00 3,377,700.00 6,755,400.00
2 Jendela type J6 unit 3.00 13,055,700.00 39,167,100.00
3 Jendela type J7 unit 2.00 16,658,300.00 33,316,600.00
4 Pintu Type PJ1 unit 3.00 27,727,900.00 83,183,700.00
Sub Jumlah 1.A.2.1 655,912,310.00
2 Gudang (as 3-4/a-b)
Pekerjaan Lantai
1 Plat lantai t=15cm, k-250 m3 1.86 3,475,800.00 6,451,953.75
2 Pasangan Floor hardener m2 12.38 89,400.00 1,106,325.00
Pekerjaan Dinding -
1 Cat dinding, acrylic emulsi m2 38.07 40,600.00 1,545,642.00
Pekerjaan Plafond -
1 Plafond gypsum 9 mm, rangka metal furing m2 12.38 100,900.00 1,248,637.50
2 List Plafond m1 14.10 26,900.00 379,290.00
3 Cat plafond, acrylic emulsi m2 12.38 40,400.00 499,950.00
Pekerjaan Pintu dan jendela -
1 Pintu Type P2 unit 3.00 2,832,600.00 8,497,800.00
Sub Jumlah 1.A.2.2 19,729,598.25
3 Toilet (as 1-2/c-d)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 15.00 166,800.00 2,502,000.00
Pekerjaan Dinding -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 37.80 217,300.00 8,213,940.00
1 Cat dinding, acrylic emulsi m2 55.08 40,600.00 2,236,248.00
Pekerjaan Plafond -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 15.00 127,000.00 1,905,000.00
2 List Plafond m1 30.40 26,900.00 817,760.00
3 Cat plafond, acrylic emulsi m2 15.00 40,400.00 606,000.00
Sanitary -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 4.00 1,393,300.00 5,573,200.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 4.00 312,800.00 1,251,200.00
3 Floor Drain ex. Toto type TX1BN bh 4.00 432,400.00 1,729,600.00
4 Tempat tisue ex. Toto AW360 J bh 4.00 538,100.00 2,152,400.00
5 Gantungan baju ex. Toto type TX704ACW bh 4.00 359,700.00 1,438,800.00
6 Wastafel ex. Toto type LW 640 + kran TX 115 LESN bh 4.00 2,402,400.00 9,609,600.00

EE GD. REKTORAT Page 33


HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

7 Meja wastafel rangka baja fin. Granit m1 4.30 822,100.00 3,535,030.00


8 Kaca cermin t= 6 mm, multiplek 9 mm,List stainless steel m2 6.45 350,000.00 2,257,500.00
Pekerjaan Pintu dan jendela -
1 Pintu type P4 unit 1.00 2,832,600.00 2,832,600.00
2 Pintu type P5 unit 4.00 2,132,700.00 8,530,800.00
3 Pintu type P6 unit 1.00 2,098,100.00 2,098,100.00
Sub Jumlah 1.A.2.3 57,289,778.00
4 Toilet (as 7-6/c-d)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 15.00 166,800.00 2,502,000.00
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 37.80 217,300.00 8,213,940.00
1 Cat dinding, acrylic emulsi m2 55.08 40,600.00 2,236,248.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 15.00 127,000.00 1,905,000.00
2 List Plafond m1 30.40 26,900.00 817,760.00
3 Cat plafond, acrylic emulsi m2 15.00 40,400.00 606,000.00
Sanitary - -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 4.00 1,393,300.00 5,573,200.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 4.00 312,800.00 1,251,200.00
3 Floor Drain ex. Toto type TX1BN bh 4.00 432,400.00 1,729,600.00
4 Tempat tisue ex. Toto AW360 J bh 4.00 538,100.00 2,152,400.00
5 Gantungan baju ex. Toto type TX704ACW bh 4.00 359,700.00 1,438,800.00
6 Wastafel ex. Toto type LW 640 + kran TX 115 LESN bh 4.00 2,402,400.00 9,609,600.00
7 Meja wastafel rangka baja fin. Granit m1 4.30 822,100.00 3,535,030.00
8 Kaca cermin t= 6 mm, multiplek 9 mm,List stainless steel m2 6.45 350,000.00 2,257,500.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P4 unit 1.00 2,832,600.00 2,832,600.00
2 Pintu type P5 unit 4.00 2,132,700.00 8,530,800.00
3 Pintu type P6 unit 1.00 2,098,100.00 2,098,100.00
Sub Jumlah 1.A.2.4 57,289,778.00
5 Area Tangga (as 5-6/a-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile uk. 30 x 30 cm polished (bordes+anak tangga) m2 63.63 378,900.00 24,109,407.00
2 Pasangan lantai keramik step nozing 10 x 30 m1 66.06 65,700.00 4,340,142.00
Pekerjaan Dinding -
1 Plint homogeneous tile 10 x 30 cm m1 34.35 41,900.00 1,439,265.00
Pekerjaan Plafond -
1 Cat plafond, acrylic emulsi m2 34.35 40,400.00 1,387,740.00
Railling -
1 Pekerjaan railing pipa BSP kombinasi besi tempa fin. Cat Duco m1 26.11 755,000.00 19,713,050.00
2 Pekerjaan hand railing pipa BSP fin. Cat Duco m1 9.07 465,500.00 4,222,085.00
Sub Jumlah 1.A.2.5 55,211,689.00
Jumlah 1.A.2 845,433,153.25
Jumlah 1.A 946,157,017.25
B FINISHING EXTERIOR
1 Cat dinding, kolom, balok struktur luar weathershield, acrylic emulsi m2 139.05 40,200.00 5,589,810.00
Sub jumlah 1.B.1 5,589,810.00
Jumlah 1.B 5,589,810.00
II PEKERJAAN LANTAI 1
A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding
1 Pasangan dinding bata merah ukuran tebal ½ bata, campuran spesi 1 Pc : 4 Ps m2 530.75 112,900.00 59,921,562.10
2 Pek. Plesteran m2 1,061.50 46,100.00 48,935,057.80
3 Pek. Acian m1 1,061.50 20,900.00 22,185,308.20
4 Plesteran + acian kolom, balok, dinding, lisplank beton struktur m2 189.44 67,000.00 12,692,480.00
5 Kolom praktis + ring balok ukuran 12 x 12 Cm m3 2.88 9,370,200.00 26,959,189.82
6 Partisi double gypsum 9mm + rangka metal studd m2 510.96 137,100.00 70,052,067.60
Sub Jumlah 2.A.1 240,745,665.52
2 Pekerjaan Finishing
1 Koridor, R. Tunggu, hall/lobby (as 1-8/a-e)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 196.03 343,700.00 67,375,511.00
2 Plint homogeneous tile 10 x 60 cm m1 132.00 41,000.00 5,412,000.00
3 Urugan pasir t=3cm m3 5.88 265,300.00 1,560,202.77
Pekerjaan Dinding -
1 Cat dinding, acrylic emulsi m2 356.40 40,600.00 14,469,840.00
Pekerjaan Plafond -

EE GD. REKTORAT Page 34


HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

1 Plafond gypsum 9 mm, rangka metal furing m2 196.03 100,900.00 19,779,427.00


2 List Plafond m1 132.00 26,900.00 3,550,800.00
3 Cat plafond, acrylic emulsi m2 196.03 40,400.00 7,919,612.00
Pekerjaan Pintu dan jendela -
1 Jendela type J1 unit 2.00 2,671,200.00 5,342,400.00
2 Jendela type J4 unit 1.00 16,792,200.00 16,792,200.00
Sub jumlah 2.A.2.1 142,201,992.77
2 R. Pudir 1 (as 1-2/c-d)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 9.95 343,700.00 3,420,889.06
2 Plint homogeneous tile 10 x 60 cm m1 13.30 41,000.00 545,300.00
3 Urugan pasir t=3cm m3 0.30 265,300.00 79,216.92
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 35.91 40,600.00 1,457,946.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 9.95 100,900.00 1,004,270.31
2 List Plafond m1 13.30 26,900.00 357,770.00
3 Cat plafond, acrylic emulsi m2 9.95 40,400.00 402,106.25
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 2,671,200.00 2,671,200.00
2 Pintu type P2 unit 1.00 2,832,600.00 2,832,600.00
Sub jumlah 2.A.2.2 12,771,298.55
3 R. Pudir 2 (as 2-3/c-d)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 10.94 343,700.00 3,759,218.75
2 Plint homogeneous tile 10 x 60 cm m1 13.75 41,000.00 563,750.00
3 Urugan pasir t=3cm m3 0.33 265,300.00 87,051.56
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 37.13 40,600.00 1,507,275.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 10.94 100,900.00 1,103,593.75
2 List Plafond m1 13.75 26,900.00 369,875.00
3 Cat plafond, acrylic emulsi m2 10.94 40,400.00 441,875.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 2,671,200.00 2,671,200.00
2 Pintu type P2 unit 1.00 2,832,600.00 2,832,600.00
Sub jumlah 2.A.2.3 13,336,439.06
4 R. Pudir 3 (as 2-3/c-d)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 10.94 343,700.00 3,759,218.75
2 Plint homogeneous tile 10 x 60 cm m1 13.75 41,000.00 563,750.00
3 Urugan pasir t=3cm m3 0.33 265,300.00 87,051.56
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 37.13 40,600.00 1,507,275.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 10.94 100,900.00 1,103,593.75
2 List Plafond m1 13.75 26,900.00 369,875.00
3 Cat plafond, acrylic emulsi m2 10.94 40,400.00 441,875.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 2,671,200.00 2,671,200.00
2 Pintu type P2 unit 1.00 2,832,600.00 2,832,600.00
Sub jumlah 2.A.2.4 13,336,439.06
5 R. Stock ATK (as 3-4/c-d)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 10.94 343,700.00 3,759,218.75
2 Plint homogeneous tile 10 x 60 cm m1 13.75 41,000.00 563,750.00
3 Urugan pasir t=3cm m3 0.33 265,300.00 87,051.56
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 37.13 40,600.00 1,507,275.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 10.94 100,900.00 1,103,593.75
2 List Plafond m1 13.75 26,900.00 369,875.00
3 Cat plafond, acrylic emulsi m2 10.94 40,400.00 441,875.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J2 unit 1.00 1,157,300.00 1,157,300.00
2 Pintu type P2 unit 1.00 2,832,600.00 2,832,600.00
Sub jumlah 2.A.2.5 11,822,539.06
6 R. Senat (as 5-6/c-d)

EE GD. REKTORAT Page 35


HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 10.94 343,700.00 3,759,218.75
2 Plint homogeneous tile 10 x 60 cm m1 13.75 41,000.00 563,750.00
3 Urugan pasir t=3cm m3 0.33 265,300.00 87,051.56
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 37.13 40,600.00 1,507,275.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 10.94 100,900.00 1,103,593.75
2 List Plafond m1 13.75 26,900.00 369,875.00
3 Cat plafond, acrylic emulsi m2 10.94 40,400.00 441,875.00
Pekerjaan Pintu dan jendela - -
2 Pintu type P2 unit 1.00 2,832,600.00 2,832,600.00
Sub jumlah 2.A.2.6 10,665,239.06
7 R. Sektetariat (as 5-6/c-d)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 10.94 343,700.00 3,759,218.75
2 Plint homogeneous tile 10 x 60 cm m1 13.75 41,000.00 563,750.00
3 Urugan pasir t=3cm m3 0.33 265,300.00 87,051.56
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 37.13 40,600.00 1,507,275.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 10.94 100,900.00 1,103,593.75
2 List Plafond m1 13.75 26,900.00 369,875.00
3 Cat plafond, acrylic emulsi m2 10.94 40,400.00 441,875.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J2 unit 1.00 1,157,300.00 1,157,300.00
2 Pintu type P2 unit 1.00 2,832,600.00 2,832,600.00
Sub jumlah 2.A.2.7 11,822,539.06
8 R. Urusan Ketarunaan (as 6-7/c-d)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 10.94 343,700.00 3,759,218.75
2 Plint homogeneous tile 10 x 60 cm m1 13.75 41,000.00 563,750.00
3 Urugan pasir t=3cm m3 0.33 265,300.00 87,051.56
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 37.13 40,600.00 1,507,275.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 10.94 100,900.00 1,103,593.75
2 List Plafond m1 13.75 26,900.00 369,875.00
3 Cat plafond, acrylic emulsi m2 10.94 40,400.00 441,875.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 2,671,200.00 2,671,200.00
2 Pintu type P2 unit 1.00 2,832,600.00 2,832,600.00
Sub jumlah 2.A.2.8 13,336,439.06
9 R. Sardik (as 6-7/c-d)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 10.94 343,700.00 3,759,218.75
2 Plint homogeneous tile 10 x 60 cm m1 13.75 41,000.00 563,750.00
3 Urugan pasir t=3cm m3 0.33 265,300.00 87,051.56
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 37.13 40,600.00 1,507,275.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 10.94 100,900.00 1,103,593.75
2 List Plafond m1 13.75 26,900.00 369,875.00
3 Cat plafond, acrylic emulsi m2 10.94 40,400.00 441,875.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 2,671,200.00 2,671,200.00
2 Pintu type P2 unit 1.00 2,832,600.00 2,832,600.00
Sub jumlah 2.A.2.9 13,336,439.06
10 R. Humas (as 7-8/c-d)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 9.95 343,700.00 3,420,889.06
2 Plint homogeneous tile 10 x 60 cm m1 13.30 41,000.00 545,300.00
3 Urugan pasir t=3cm m3 0.30 265,300.00 79,216.92
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 35.91 40,600.00 1,457,946.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 9.95 100,900.00 1,004,270.31
2 List Plafond m1 13.30 26,900.00 357,770.00

EE GD. REKTORAT Page 36


HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

3 Cat plafond, acrylic emulsi m2 9.95 40,400.00 402,106.25


Pekerjaan Pintu dan jendela - -
1 Jendela type J2 unit 1.00 1,157,300.00 1,157,300.00
2 Pintu type P2 unit 1.00 2,832,600.00 2,832,600.00
Sub jumlah 2.A.2.10 11,257,398.55
11 R. Direktur (as 1-2/d-e)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 20.68 343,700.00 7,105,997.50
2 Plint homogeneous tile 10 x 60 cm m1 18.27 41,000.00 749,070.00
3 Urugan pasir t=3cm m3 0.62 265,300.00 164,552.33
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 49.33 40,600.00 2,002,757.40
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 20.68 100,900.00 2,086,107.50
2 List Plafond m1 18.27 26,900.00 491,463.00
3 Cat plafond, acrylic emulsi m2 20.68 40,400.00 835,270.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 2.00 2,671,200.00 5,342,400.00
2 Pintu type P2 unit 1.00 2,832,600.00 2,832,600.00
Sub jumlah 2.A.2.11 21,610,217.73
12 R. Arsip Keuangan (as 2-3/d-e)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 8.00 343,700.00 2,749,600.00
2 Plint homogeneous tile 10 x 60 cm m1 11.40 41,000.00 467,400.00
3 Urugan pasir t=3cm m3 0.24 265,300.00 63,672.00
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 30.78 40,600.00 1,249,668.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 8.00 100,900.00 807,200.00
2 List Plafond m1 11.40 26,900.00 306,660.00
3 Cat plafond, acrylic emulsi m2 8.00 40,400.00 323,200.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 2,671,200.00 2,671,200.00
2 Pintu type P2 unit 1.00 2,832,600.00 2,832,600.00
Sub jumlah 2.A.2.12 11,471,200.00
13 R. Arsip Akademik (as 2-3/d-e)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 8.75 343,700.00 3,007,375.00
2 Plint homogeneous tile 10 x 60 cm m1 12.00 41,000.00 492,000.00
3 Urugan pasir t=3cm m3 0.26 265,300.00 69,641.25
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 32.40 40,600.00 1,315,440.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 8.75 100,900.00 882,875.00
2 List Plafond m1 12.00 26,900.00 322,800.00
3 Cat plafond, acrylic emulsi m2 8.75 40,400.00 353,500.00
Pekerjaan Pintu dan jendela - -
2 Pintu type P2 unit 1.00 2,832,600.00 2,832,600.00
Sub jumlah 2.A.2.13 9,276,231.25
14 R. Adm Akademik (as 2-4/d-e)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 33.75 343,700.00 11,599,875.00
2 Plint homogeneous tile 10 x 60 cm m1 24.00 41,000.00 984,000.00
3 Urugan pasir t=3cm m3 1.01 265,300.00 268,616.25
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 64.80 40,600.00 2,630,880.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 33.75 100,900.00 3,405,375.00
2 List Plafond m1 24.00 26,900.00 645,600.00
3 Cat plafond, acrylic emulsi m2 33.75 40,400.00 1,363,500.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 3.00 2,671,200.00 8,013,600.00
Sub jumlah 2.A.2.14 28,911,446.25
15 R. KABAG Akademik (as 4-5/d-e)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 9.95 343,700.00 3,420,889.06
2 Plint homogeneous tile 10 x 60 cm m1 13.30 41,000.00 545,300.00
3 Urugan pasir t=3cm m3 0.30 265,300.00 79,216.92

EE GD. REKTORAT Page 37


HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 26.87 40,600.00 1,091,061.56
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 9.95 100,900.00 1,004,270.31
2 List Plafond m1 13.30 26,900.00 357,770.00
3 Cat plafond, acrylic emulsi m2 9.95 40,400.00 402,106.25
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 2,671,200.00 2,671,200.00
2 Pintu type P2 unit 1.00 2,832,600.00 2,832,600.00
Sub jumlah 2.A.2.15 12,404,414.11
16 R. KABAG Umum (as 4-5/d-e)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 9.95 343,700.00 3,420,889.06
2 Plint homogeneous tile 10 x 60 cm m1 13.30 41,000.00 545,300.00
3 Urugan pasir t=3cm m3 0.30 265,300.00 79,216.92
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 26.87 40,600.00 1,091,061.56
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 9.95 100,900.00 1,004,270.31
2 List Plafond m1 13.30 26,900.00 357,770.00
3 Cat plafond, acrylic emulsi m2 9.95 40,400.00 402,106.25
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 2,671,200.00 2,671,200.00
2 Pintu type P2 unit 1.00 2,832,600.00 2,832,600.00
Sub jumlah 2.A.2.16 12,404,414.11
17 R. Staff Prodi (as 5-7/d-e)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 32.50 343,700.00 11,170,250.00
2 Plint homogeneous tile 10 x 60 cm m1 26.50 41,000.00 1,086,500.00
3 Urugan pasir t=3cm m3 0.98 265,300.00 258,667.50
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 71.55 40,600.00 2,904,930.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 32.50 100,900.00 3,279,250.00
2 List Plafond m1 26.50 26,900.00 712,850.00
3 Cat plafond, acrylic emulsi m2 32.50 40,400.00 1,313,000.00
Sub jumlah 2.A.2.17 20,725,447.50
18 R. Pustaka Jurusan (as 5-6/d-e)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 9.63 343,700.00 3,308,112.50
2 Plint homogeneous tile 10 x 60 cm m1 12.70 41,000.00 520,700.00
3 Urugan pasir t=3cm m3 0.29 265,300.00 76,605.38
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 34.29 40,600.00 1,392,174.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 9.63 100,900.00 971,162.50
2 List Plafond m1 12.70 26,900.00 341,630.00
3 Cat plafond, acrylic emulsi m2 9.63 40,400.00 388,850.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 2,671,200.00 2,671,200.00
2 Pintu type P2 unit 1.00 2,832,600.00 2,832,600.00
Sub jumlah 2.A.2.18 12,503,034.38
19 R. Kepala Prodi 1 (as 5-6/d-e)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 9.63 343,700.00 3,308,112.50
2 Plint homogeneous tile 10 x 60 cm m1 12.70 41,000.00 520,700.00
3 Urugan pasir t=3cm m3 0.29 265,300.00 76,605.38
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 34.29 40,600.00 1,392,174.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 9.63 100,900.00 971,162.50
2 List Plafond m1 12.70 26,900.00 341,630.00
3 Cat plafond, acrylic emulsi m2 9.63 40,400.00 388,850.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 2,671,200.00 2,671,200.00
2 Pintu type P2 unit 1.00 2,832,600.00 2,832,600.00
Sub jumlah 2.A.2.19 12,503,034.38
20 R. Kepala Prodi 2 (as 6-7/d-e)

EE GD. REKTORAT Page 38


HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 9.63 343,700.00 3,308,112.50
2 Plint homogeneous tile 10 x 60 cm m1 12.70 41,000.00 520,700.00
3 Urugan pasir t=3cm m3 0.29 265,300.00 76,605.38
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 34.29 40,600.00 1,392,174.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 9.63 100,900.00 971,162.50
2 List Plafond m1 12.70 26,900.00 341,630.00
3 Cat plafond, acrylic emulsi m2 9.63 40,400.00 388,850.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 2,671,200.00 2,671,200.00
2 Pintu type P2 unit 1.00 2,832,600.00 2,832,600.00
Sub jumlah 2.A.2.20 12,503,034.38
21 R. Kepala Prodi 3 (as 6-7/d-e)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 9.63 343,700.00 3,308,112.50
2 Plint homogeneous tile 10 x 60 cm m1 12.70 41,000.00 520,700.00
3 Urugan pasir t=3cm m3 0.29 265,300.00 76,605.38
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 34.29 40,600.00 1,392,174.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 9.63 100,900.00 971,162.50
2 List Plafond m1 12.70 26,900.00 341,630.00
3 Cat plafond, acrylic emulsi m2 9.63 40,400.00 388,850.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 2,671,200.00 2,671,200.00
2 Pintu type P2 unit 1.00 2,832,600.00 2,832,600.00
Sub jumlah 2.A.2.21 12,503,034.38
22 R. Audio (as 7-8/d-e)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 4.28 343,700.00 1,472,410.80
2 Plint homogeneous tile 10 x 60 cm m1 8.66 41,000.00 355,060.00
3 Urugan pasir t=3cm m3 0.13 265,300.00 34,096.36
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 23.38 40,600.00 949,309.20
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 4.28 100,900.00 432,255.60
2 List Plafond m1 8.66 26,900.00 232,954.00
3 Cat plafond, acrylic emulsi m2 4.28 40,400.00 173,073.60
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 2,671,200.00 2,671,200.00
2 Pintu type P2 unit 1.00 2,832,600.00 2,832,600.00
Sub jumlah 2.A.2.22 9,152,959.56
23 R. Rapat (as 7-8/d-e)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 20.31 343,700.00 6,981,406.25
2 Plint homogeneous tile 10 x 60 cm m1 19.25 41,000.00 789,250.00
3 Urugan pasir t=3cm m3 0.61 265,300.00 161,667.19
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 51.98 40,600.00 2,110,185.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 20.31 100,900.00 2,049,531.25
2 List Plafond m1 19.25 26,900.00 517,825.00
3 Cat plafond, acrylic emulsi m2 20.31 40,400.00 820,625.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 2.00 2,671,200.00 5,342,400.00
2 Pintu type P3 unit 1.00 4,902,800.00 4,902,800.00
Sub jumlah 2.A.2.23 23,675,689.69
24 R. Panel (as 3-4/a-b)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 3.30 343,700.00 1,134,210.00
2 Plint homogeneous tile 10 x 60 cm m1 7.30 41,000.00 299,300.00
3 Urugan pasir t=3cm m3 0.10 265,300.00 26,264.70
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 19.71 40,600.00 800,226.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 3.30 100,900.00 332,970.00

EE GD. REKTORAT Page 39


HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

2 List Plafond m1 7.30 26,900.00 196,370.00


3 Cat plafond, acrylic emulsi m2 3.30 40,400.00 133,320.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P2 unit 1.00 2,832,600.00 2,832,600.00
Sub jumlah 2.A.2.24 5,755,260.70
25 R. server (as 3-4/a-b)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 3.30 343,700.00 1,134,210.00
2 Plint homogeneous tile 10 x 60 cm m1 7.30 41,000.00 299,300.00
3 Urugan pasir t=3cm m3 0.10 265,300.00 26,264.70
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 19.71 40,600.00 800,226.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 3.30 100,900.00 332,970.00
2 List Plafond m1 7.30 26,900.00 196,370.00
3 Cat plafond, acrylic emulsi m2 3.30 40,400.00 133,320.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P2 unit 1.00 2,832,600.00 2,832,600.00
Sub jumlah 2.A.2.25 5,755,260.70
26 selasar R. server dan R. Panel (as 3-4/a-b)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 5.45 343,700.00 1,871,446.50
2 Plint homogeneous tile 10 x 60 cm m1 9.90 41,000.00 405,900.00
3 Urugan pasir t=3cm m3 0.16 265,300.00 43,336.76
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 26.73 40,600.00 1,085,238.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 5.45 100,900.00 549,400.50
2 List Plafond m1 9.90 26,900.00 266,310.00
3 Cat plafond, acrylic emulsi m2 5.45 40,400.00 219,978.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P2 unit 1.00 2,832,600.00 2,832,600.00
Sub jumlah 3.A.2.4 7,274,209.76
27 Toilet (as 1-2/c-d)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 15.00 166,800.00 2,502,000.00
2 Waterproofing coating m2 15.00 133,700.00 2,005,500.00
3 Urugan pasir t=3cm m3 0.45 265,300.00 119,385.00
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 37.80 217,300.00 8,213,940.00
1 Cat dinding, acrylic emulsi m2 55.08 40,600.00 2,236,248.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 15.00 127,000.00 1,905,000.00
2 List Plafond m1 30.40 26,900.00 817,760.00
3 Cat plafond, acrylic emulsi m2 15.00 40,400.00 606,000.00
Sanitary - -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 4.00 1,393,300.00 5,573,200.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 4.00 312,800.00 1,251,200.00
3 Floor Drain ex. Toto type TX1BN bh 4.00 432,400.00 1,729,600.00
4 Tempat tisue ex. Toto AW360 J bh 4.00 538,100.00 2,152,400.00
5 Gantungan baju ex. Toto type TX704ACW bh 4.00 359,700.00 1,438,800.00
6 Wastafel ex. Toto type LW 640 + kran TX 115 LESN bh 4.00 2,402,400.00 9,609,600.00
7 Meja wastafel rangka baja fin. Granit m1 4.30 822,100.00 3,535,030.00
8 Kaca cermin t= 6 mm, multiplek 9 mm,List stainless steel m2 6.45 350,000.00 2,257,500.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P4 unit 1.00 2,832,600.00 2,832,600.00
2 Pintu type P5 unit 4.00 2,132,700.00 8,530,800.00
3 Pintu type P6 unit 1.00 2,098,100.00 2,098,100.00
Sub Jumlah 1.A.2.26 59,414,663.00
28 Toilet (as 7-8/c-d)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 15.00 166,800.00 2,502,000.00
2 Waterproofing coating m2 15.00 133,700.00 2,005,500.00
3 Urugan pasir t=3cm m3 0.45 265,300.00 119,385.00
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 37.80 217,300.00 8,213,940.00
1 Cat dinding, acrylic emulsi m2 55.08 40,600.00 2,236,248.00
Pekerjaan Plafond - -

EE GD. REKTORAT Page 40


HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 15.00 127,000.00 1,905,000.00
2 List Plafond m1 30.40 26,900.00 817,760.00
3 Cat plafond, acrylic emulsi m2 15.00 40,400.00 606,000.00
Sanitary - -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 4.00 1,393,300.00 5,573,200.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 4.00 312,800.00 1,251,200.00
3 Floor Drain ex. Toto type TX1BN bh 4.00 432,400.00 1,729,600.00
4 Tempat tisue ex. Toto AW360 J bh 4.00 538,100.00 2,152,400.00
5 Gantungan baju ex. Toto type TX704ACW bh 4.00 359,700.00 1,438,800.00
6 Wastafel ex. Toto type LW 640 + kran TX 115 LESN bh 4.00 2,402,400.00 9,609,600.00
7 Meja wastafel rangka baja fin. Granit m1 4.30 822,100.00 3,535,030.00
8 Kaca cermin t= 6 mm, multiplek 9 mm,List stainless steel m2 6.45 350,000.00 2,257,500.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P4 unit 1.00 2,832,600.00 2,832,600.00
2 Pintu type P5 unit 4.00 2,132,700.00 8,530,800.00
3 Pintu type P6 unit 1.00 2,098,100.00 2,098,100.00
Sub Jumlah 1.A.2.27 59,414,663.00
29 Toilet (as 1-2/d-e)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 4.50 166,800.00 750,600.00
2 Waterproofing coating m2 4.50 133,700.00 601,650.00
3 Urugan pasir t=3cm m3 0.14 265,300.00 35,815.50
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 14.40 217,300.00 3,129,120.00
1 Cat dinding, acrylic emulsi m2 5.40 40,600.00 219,240.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 4.50 127,000.00 571,500.00
2 List Plafond m1 5.40 26,900.00 145,260.00
3 Cat plafond, acrylic emulsi m2 4.50 40,400.00 181,800.00
Sanitary - -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 4.00 1,393,300.00 5,573,200.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 4.00 312,800.00 1,251,200.00
3 Floor Drain ex. Toto type TX1BN bh 4.00 432,400.00 1,729,600.00
4 Tempat tisue ex. Toto AW360 J bh 4.00 538,100.00 2,152,400.00
5 Gantungan baju ex. Toto type TX704ACW bh 4.00 359,700.00 1,438,800.00
6 Wastafel ex. Toto type LW 640 + kran TX 115 LESN bh 4.00 2,402,400.00 9,609,600.00
7 Meja wastafel rangka baja fin. Granit m1 4.30 822,100.00 3,535,030.00
8 Kaca cermin t= 6 mm, multiplek 9 mm,List stainless steel m2 6.45 350,000.00 2,257,500.00
Pekerjaan Pintu dan jendela - -
2 Pintu type P5 unit 4.00 2,132,700.00 8,530,800.00
Sub Jumlah 1.A.2.28 41,713,115.50
30 Area Tangga (as 5-6/a-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile uk. 30 x 30 cm polished (bordes+anak tangga) m2 63.63 378,900.00 24,109,407.00
2 Pasangan lantai keramik step nozing 10 x 30 m1 66.06 65,700.00 4,340,142.00
Pekerjaan Dinding - -
1 Plint homogeneous tile 10 x 30 cm m1 34.35 41,900.00 1,439,265.00
Pekerjaan Plafond - -
1 Cat plafond, acrylic emulsi m2 34.35 40,400.00 1,387,740.00
Railling - -
1 Pekerjaan railing pipa BSP kombinasi besi tempa fin. Cat Duco m1 26.11 755,000.00 19,713,050.00
2 Pekerjaan hand railing pipa BSP fin. Cat Duco m1 9.07 465,500.00 4,222,085.00
Sub Jumlah 2.A.2.29 55,211,689.00
Jumlah 2.A.2 688,069,782.64
Jumlah 2.A 928,815,448.17
B FINISHING EXTERIOR
1 Cat dinding, kolom, balok struktur luar weathershield, acrylic emulsi m2 272.70 40,200.00 10,962,540.00
Sub jumlah 2.B.1 10,962,540.00
Jumlah 2.B 10,962,540.00
III PEKERJAAN LANTAI 2
A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding
1 Pasangan dinding bata merah ukuran tebal ½ bata, campuran spesi 1 Pc : 4 Ps m2 614.76 112,900.00 69,405,839.50
2 Pek. Plesteran m2 1,229.51 46,100.00 56,680,411.00
3 Pek. Acian m1 1,229.51 20,900.00 25,696,759.00
4 Plesteran + acian kolom, balok, dinding, lisplank beton struktur m2 189.44 67,000.00 12,692,480.00
5 Kolom praktis + ring balok ukuran 12 x 12 Cm m3 2.56 9,370,200.00 23,963,724.29
6 Partisi double gypsum rangka metal studd m2 101.44 137,100.00 13,907,424.00

EE GD. REKTORAT Page 41


HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

Sub Jumlah 3.A.1 202,346,637.79


2 Pekerjaan Finishing
1 hall/lobby (as 4-5/a-d)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 73.24 343,700.00 25,172,588.00
2 Plint homogeneous tile 10 x 60 cm m1 50.35 41,000.00 2,064,350.00
3 Urugan pasir t=3cm m3 2.20 265,300.00 582,917.16
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 135.95 40,600.00 5,519,367.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 73.24 100,900.00 7,389,916.00
2 List Plafond m1 50.35 26,900.00 1,354,415.00
3 Cat plafond, acrylic emulsi m2 73.24 40,400.00 2,958,896.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J4 unit 1.00 16,792,200.00 16,792,200.00
Sub jumlah 3.A.2.1 61,834,649.16
2 R. Panel (as 3-4/a-b)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 3.30 343,700.00 1,134,210.00
2 Plint homogeneous tile 10 x 60 cm m1 7.30 41,000.00 299,300.00
3 Urugan pasir t=3cm m3 0.10 265,300.00 26,264.70
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 19.71 40,600.00 800,226.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 3.30 100,900.00 332,970.00
2 List Plafond m1 7.30 26,900.00 196,370.00
3 Cat plafond, acrylic emulsi m2 3.30 40,400.00 133,320.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P2 unit 1.00 2,832,600.00 2,832,600.00
Sub jumlah 3.A.2.2 5,755,260.70
3 R. server (as 3-4/a-b)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 3.30 343,700.00 1,134,210.00
2 Plint homogeneous tile 10 x 60 cm m1 7.30 41,000.00 299,300.00
3 Urugan pasir t=3cm m3 0.10 265,300.00 26,264.70
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 19.71 40,600.00 800,226.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 3.30 100,900.00 332,970.00
2 List Plafond m1 7.30 26,900.00 196,370.00
3 Cat plafond, acrylic emulsi m2 3.30 40,400.00 133,320.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P2 unit 1.00 2,832,600.00 2,832,600.00
Sub jumlah 3.A.2.3 5,755,260.70
4 selasar R. server dan R. Panel (as 3-4/a-b)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 5.45 343,700.00 1,871,446.50
2 Plint homogeneous tile 10 x 60 cm m1 9.90 41,000.00 405,900.00
3 Urugan pasir t=3cm m3 0.16 265,300.00 43,336.76
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 26.73 40,600.00 1,085,238.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 5.45 100,900.00 549,400.50
2 List Plafond m1 9.90 26,900.00 266,310.00
3 Cat plafond, acrylic emulsi m2 5.45 40,400.00 219,978.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P2 unit 1.00 2,832,600.00 2,832,600.00
Sub jumlah 3.A.2.4 7,274,209.76
5 R. Dosen (as 1-4/c-e)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 191.72 343,700.00 65,894,164.00
2 Plint homogeneous tile 10 x 60 cm m1 57.60 41,000.00 2,361,600.00
3 Urugan pasir t=3cm m3 5.75 265,300.00 1,525,899.48
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 155.52 40,600.00 6,314,112.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 191.72 100,900.00 19,344,548.00
2 List Plafond m1 57.60 26,900.00 1,549,440.00

EE GD. REKTORAT Page 42


HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

3 Cat plafond, acrylic emulsi m2 191.72 40,400.00 7,745,488.00


Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 11.00 2,671,200.00 29,383,200.00
1 Jendela type J2 unit 1.00 1,157,300.00 1,157,300.00
2 Pintu type P3 unit 1.00 4,902,800.00 4,902,800.00
Sub jumlah 3.A.2.5 140,178,551.48
6 R. Admin dan Pustakawan (as 4-5/d-e)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 35.00 343,700.00 12,029,500.00
2 Plint homogeneous tile 10 x 60 cm m1 24.00 41,000.00 984,000.00
3 Urugan pasir t=3cm m3 1.05 265,300.00 278,565.00
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 64.80 40,600.00 2,630,880.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 35.00 100,900.00 3,531,500.00
2 List Plafond m1 24.00 26,900.00 645,600.00
3 Cat plafond, acrylic emulsi m2 35.00 40,400.00 1,414,000.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 2.00 2,671,200.00 5,342,400.00
2 Pintu type P3 unit 1.00 4,902,800.00 4,902,800.00
Sub jumlah 3.A.2.6 31,759,245.00
7 Perpustakaan (as 5-8/c-e)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 191.72 343,700.00 65,894,164.00
2 Plint homogeneous tile 10 x 60 cm m1 57.60 41,000.00 2,361,600.00
3 Urugan pasir t=3cm m3 5.75 265,300.00 1,525,899.48
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 155.52 40,600.00 6,314,112.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 191.72 100,900.00 19,344,548.00
2 List Plafond m1 57.60 26,900.00 1,549,440.00
3 Cat plafond, acrylic emulsi m2 191.72 40,400.00 7,745,488.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 11.00 2,671,200.00 29,383,200.00
1 Jendela type J2 unit 1.00 1,157,300.00 1,157,300.00
2 Pintu type P3 unit 1.00 4,902,800.00 4,902,800.00
Sub jumlah 3.A.2.7 140,178,551.48
8 Toilet (as 1-2/c-d)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 15.00 166,800.00 2,502,000.00
2 Waterproofing coating m2 15.00 133,700.00 2,005,500.00
3 Urugan pasir t=3cm m3 0.45 265,300.00 119,385.00
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 37.80 217,300.00 8,213,940.00
1 Cat dinding, acrylic emulsi m2 55.08 40,600.00 2,236,248.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 15.00 127,000.00 1,905,000.00
2 List Plafond m1 30.40 26,900.00 817,760.00
3 Cat plafond, acrylic emulsi m2 15.00 40,400.00 606,000.00
Sanitary - -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 4.00 1,393,300.00 5,573,200.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 4.00 312,800.00 1,251,200.00
3 Floor Drain ex. Toto type TX1BN bh 4.00 432,400.00 1,729,600.00
4 Tempat tisue ex. Toto AW360 J bh 4.00 538,100.00 2,152,400.00
5 Gantungan baju ex. Toto type TX704ACW bh 4.00 359,700.00 1,438,800.00
6 Wastafel ex. Toto type LW 640 + kran TX 115 LESN bh 4.00 2,402,400.00 9,609,600.00
7 Meja wastafel rangka baja fin. Granit m1 4.30 822,100.00 3,535,030.00
8 Kaca cermin t= 6 mm, multiplek 9 mm,List stainless steel m2 6.45 350,000.00 2,257,500.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P4 unit 1.00 2,832,600.00 2,832,600.00
2 Pintu type P5 unit 4.00 2,132,700.00 8,530,800.00
3 Pintu type P6 unit 1.00 2,098,100.00 2,098,100.00
Sub jumlah 3.A.2.8 59,414,663.00
9 Toilet (as 7-8/c-d)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 15.00 166,800.00 2,502,000.00
2 Waterproofing coating m2 15.00 133,700.00 2,005,500.00
3 Urugan pasir t=3cm m3 0.45 265,300.00 119,385.00

EE GD. REKTORAT Page 43


HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 37.80 217,300.00 8,213,940.00
1 Cat dinding, acrylic emulsi m2 55.08 40,600.00 2,236,248.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 15.00 127,000.00 1,905,000.00
2 List Plafond m1 30.40 26,900.00 817,760.00
3 Cat plafond, acrylic emulsi m2 15.00 40,400.00 606,000.00
Sanitary - -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 4.00 1,393,300.00 5,573,200.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 4.00 312,800.00 1,251,200.00
3 Floor Drain ex. Toto type TX1BN bh 4.00 432,400.00 1,729,600.00
4 Tempat tisue ex. Toto AW360 J bh 4.00 538,100.00 2,152,400.00
5 Gantungan baju ex. Toto type TX704ACW bh 4.00 359,700.00 1,438,800.00
6 Wastafel ex. Toto type LW 640 + kran TX 115 LESN bh 4.00 2,402,400.00 9,609,600.00
7 Meja wastafel rangka baja fin. Granit m1 4.30 822,100.00 3,535,030.00
8 Kaca cermin t= 6 mm, multiplek 9 mm,List stainless steel m2 6.45 350,000.00 2,257,500.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P4 unit 1.00 2,832,600.00 2,832,600.00
2 Pintu type P5 unit 4.00 2,132,700.00 8,530,800.00
3 Pintu type P6 unit 1.00 2,098,100.00 2,098,100.00
Sub jumlah 3.A.2.9 59,414,663.00
10 Area Tangga (as 5-6/a-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile uk. 30 x 30 cm polished (bordes+anak tangga) m2 63.63 378,900.00 24,109,407.00
2 Pasangan lantai keramik step nozing 10 x 30 m1 66.06 65,700.00 4,340,142.00
Pekerjaan Dinding - -
1 Plint homogeneous tile 10 x 30 cm m1 34.35 41,900.00 1,439,265.00
Pekerjaan Plafond - -
1 Cat plafond, acrylic emulsi m2 34.35 40,400.00 1,387,740.00
Railling - -
1 Pekerjaan railing pipa BSP kombinasi besi tempa fin. Cat Duco m1 26.11 755,000.00 19,713,050.00
2 Pekerjaan hand railing pipa BSP fin. Cat Duco m1 9.07 465,500.00 4,222,085.00
Sub jumlah 3.A.2.10 55,211,689.00
Jumlah 3.A.2 566,776,743.28
Jumlah 3.A 769,123,381.06
B FINISHING EXTERIOR
1 Cat dinding, kolom, balok struktur luar weathershield, acrylic emulsi m2 272.70 40,200.00 10,962,540.00
Sub jumlah 3.B.1 10,962,540.00
Jumlah 3.B 10,962,540.00
IV PEKERJAAN LANTAI 3
A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding
1 Pasangan dinding bata merah ukuran tebal ½ bata, campuran spesi 1 Pc : 4 Ps m2 614.76 112,900.00 69,405,839.50
2 Pek. Plesteran m2 1,229.51 46,100.00 56,680,411.00
3 Pek. Acian m1 1,229.51 20,900.00 25,696,759.00
4 Plesteran + acian kolom, balok, dinding, lisplank beton struktur m2 189.44 67,000.00 12,692,480.00
5 Kolom praktis + ring balok ukuran 12 x 12 Cm m3 2.56 9,370,200.00 23,963,724.29
6 Partisi double gypsum 9mm + rangka metal studd m2 350.14 137,100.00 48,004,194.00
Sub Jumlah 4.A.1 236,443,407.79
2 Pekerjaan Finishing
1 hall/lobby (as 4-5/a-d)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 44.94 343,700.00 15,445,878.00
2 Plint homogeneous tile 10 x 60 cm m1 38.35 41,000.00 1,572,350.00
3 Urugan pasir t=3cm m3 1.35 265,300.00 357,677.46
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 103.55 40,600.00 4,203,927.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 44.94 100,900.00 4,534,446.00
2 List Plafond m1 38.35 26,900.00 1,031,615.00
3 Cat plafond, acrylic emulsi m2 44.94 40,400.00 1,815,576.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J4 unit 1.00 16,792,200.00 16,792,200.00
Sub jumlah 4.A.2.1 45,753,669.46
2 R. Panel (as 3-4/a-b)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 3.30 343,700.00 1,134,210.00
2 Plint homogeneous tile 10 x 60 cm m1 7.30 41,000.00 299,300.00

EE GD. REKTORAT Page 44


HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

3 Urugan pasir t=3cm m3 0.10 265,300.00 26,264.70


Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 19.71 40,600.00 800,226.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 3.30 100,900.00 332,970.00
2 List Plafond m1 7.30 26,900.00 196,370.00
3 Cat plafond, acrylic emulsi m2 3.30 40,400.00 133,320.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P2 unit 1.00 2,832,600.00 2,832,600.00
Sub jumlah 4.A.2.2 5,755,260.70
3 R. server (as 3-4/a-b) -
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 3.30 343,700.00 1,134,210.00
2 Plint homogeneous tile 10 x 60 cm m1 7.30 41,000.00 299,300.00
3 Urugan pasir t=3cm m3 0.10 265,300.00 26,264.70
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 19.71 40,600.00 800,226.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 3.30 100,900.00 332,970.00
2 List Plafond m1 7.30 26,900.00 196,370.00
3 Cat plafond, acrylic emulsi m2 3.30 40,400.00 133,320.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P2 unit 1.00 2,832,600.00 2,832,600.00
Sub jumlah 4.A.2.3 5,755,260.70
4 selasar R. server dan R. Panel (as 3-4/a-b) -
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 5.45 343,700.00 1,871,446.50
2 Plint homogeneous tile 10 x 60 cm m1 9.90 41,000.00 405,900.00
3 Urugan pasir t=3cm m3 0.16 265,300.00 43,336.76
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 26.73 40,600.00 1,085,238.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 5.45 100,900.00 549,400.50
2 List Plafond m1 9.90 26,900.00 266,310.00
3 Cat plafond, acrylic emulsi m2 5.45 40,400.00 219,978.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P2 unit 1.00 2,832,600.00 2,832,600.00
Sub jumlah 4.A.2.4 7,274,209.76
5 koridor (as 1-8/c-e) -
Pekerjaan Lantai -
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 111.44 343,700.00 38,301,928.00
2 Plint homogeneous tile 10 x 60 cm m1 110.73 41,000.00 4,539,930.00
3 Urugan pasir t=3cm m3 3.34 265,300.00 886,950.96
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 298.97 40,600.00 12,138,222.60
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 111.44 100,900.00 11,244,296.00
2 List Plafond m1 110.73 26,900.00 2,978,637.00
3 Cat plafond, acrylic emulsi m2 111.44 40,400.00 4,502,176.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J2 unit 2.00 1,157,300.00 2,314,600.00
1 Jendela type J3 unit 8.00 3,037,400.00 24,299,200.00
Sub jumlah 4.A.2.5 101,205,940.56
6 R. Persiapan Wanita (as 1-2/d-e)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 10.40 343,700.00 3,574,480.00
2 Plint homogeneous tile 10 x 60 cm m1 12.90 41,000.00 528,900.00
3 Urugan pasir t=3cm m3 0.31 265,300.00 82,773.60
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 34.83 40,600.00 1,414,098.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 10.40 100,900.00 1,049,360.00
2 List Plafond m1 12.90 26,900.00 347,010.00
3 Cat plafond, acrylic emulsi m2 10.40 40,400.00 420,160.00
Pekerjaan Pintu dan jendela -
1 Jendela type J3 unit 1.00 3,037,400.00 3,037,400.00
2 Pintu type P2 unit 1.00 2,832,600.00 2,832,600.00
Sub jumlah 4.A.2.6 13,286,781.60

EE GD. REKTORAT Page 45


HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

7 R. Persiapan Pria (as 1-2/d-e)


Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 10.40 343,700.00 3,574,480.00
2 Plint homogeneous tile 10 x 60 cm m1 12.90 41,000.00 528,900.00
3 Urugan pasir t=3cm m3 0.31 265,300.00 82,773.60
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 34.83 40,600.00 1,414,098.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 10.40 100,900.00 1,049,360.00
2 List Plafond m1 12.90 26,900.00 347,010.00
3 Cat plafond, acrylic emulsi m2 10.40 40,400.00 420,160.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J3 unit 1.00 3,037,400.00 3,037,400.00
2 Pintu type P2 unit 1.00 2,832,600.00 2,832,600.00
Sub jumlah 4.A.2.7 13,286,781.60
8 R. Audio (as 1-2/d-e)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 7.07 343,700.00 2,429,959.00
2 Plint homogeneous tile 10 x 60 cm m1 11.70 41,000.00 479,700.00
3 Urugan pasir t=3cm m3 0.21 265,300.00 56,270.13
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 31.59 40,600.00 1,282,554.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 7.07 100,900.00 713,363.00
2 List Plafond m1 11.70 26,900.00 314,730.00
3 Cat plafond, acrylic emulsi m2 7.07 40,400.00 285,628.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J3 unit 2.00 3,037,400.00 6,074,800.00
2 Pintu type P2 unit 2.00 2,832,600.00 5,665,200.00
Sub jumlah 4.A.2.8 17,302,204.13
9 R. Audio (as 7-8/d-e)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 7.07 343,700.00 2,429,959.00
2 Plint homogeneous tile 10 x 60 cm m1 11.70 41,000.00 479,700.00
3 Urugan pasir t=3cm m3 0.21 265,300.00 56,270.13
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 31.59 40,600.00 1,282,554.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 7.07 100,900.00 713,363.00
2 List Plafond m1 11.70 26,900.00 314,730.00
3 Cat plafond, acrylic emulsi m2 7.07 40,400.00 285,628.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J3 unit 2.00 3,037,400.00 6,074,800.00
2 Pintu type P2 unit 2.00 2,832,600.00 5,665,200.00
Sub jumlah 4.A.2.9 17,302,204.13
10 R. Aula (as 2-7/c-e)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 280.03 343,700.00 96,246,311.00
2 Plint homogeneous tile 10 x 60 cm m1 72.73 41,000.00 2,981,930.00
3 Urugan pasir t=3cm m3 8.40 265,300.00 2,228,758.77
4 Peninggian lantai stage +20cm m3 6.02 247,600.00 1,490,552.00
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 89.64 40,600.00 3,639,482.66
2 Partisi knockdown m2 66.96 205,650.00 13,770,324.00
Pekerjaan Plafond -
1 Plafond gypsum 9 mm, rangka metal furing m2 280.03 100,900.00 28,255,027.00
2 List Plafond m1 72.73 26,900.00 1,956,437.00
3 Cat plafond, acrylic emulsi m2 280.03 40,400.00 11,313,212.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J3 unit 8.00 3,037,400.00 24,299,200.00
2 Pintu type P1 unit 3.00 4,872,300.00 14,616,900.00
Sub jumlah 4.A.2.10 200,798,134.43
11 Gudang (as 7-8/d-e)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 10.40 343,700.00 3,574,480.00
2 Plint homogeneous tile 10 x 60 cm m1 12.90 41,000.00 528,900.00
3 Urugan pasir t=3cm m3 0.31 265,300.00 82,773.60
Pekerjaan Dinding - -

EE GD. REKTORAT Page 46


HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

1 Cat dinding, acrylic emulsi m2 34.83 40,600.00 1,414,098.00


Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 10.40 100,900.00 1,049,360.00
2 List Plafond m1 12.90 26,900.00 347,010.00
3 Cat plafond, acrylic emulsi m2 10.40 40,400.00 420,160.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J3 unit 1.00 3,037,400.00 3,037,400.00
2 Pintu type P2 unit 1.00 2,832,600.00 2,832,600.00
Sub jumlah 4.A.2.11 13,286,781.60
12 Pantry (as 7-8/d-e)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 10.40 343,700.00 3,574,480.00
2 Plint homogeneous tile 10 x 60 cm m1 12.90 41,000.00 528,900.00
3 Urugan pasir t=3cm m3 0.31 265,300.00 82,773.60
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 34.83 40,600.00 1,414,098.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 10.40 100,900.00 1,049,360.00
2 List Plafond m1 12.90 26,900.00 347,010.00
3 Cat plafond, acrylic emulsi m2 10.40 40,400.00 420,160.00
Saniter -
1 Pek. Meja beton lapis keramik 30 x 30 cm m2 1.25 624,800.00 781,000.00
2 Kitchen sink unit 1.00 1,002,600.00 1,002,600.00
3 Kran Ex. Toto type. TX609 bh 1.00 284,000.00 284,000.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J3 unit 1.00 3,037,400.00 3,037,400.00
2 Pintu type P2 unit 1.00 2,832,600.00 2,832,600.00
Sub jumlah 4.A.2.12 15,354,381.60
13 Toilet (as 1-2/c-d)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 15.00 166,800.00 2,502,000.00
2 Waterproofing coating m2 15.00 133,700.00 2,005,500.00
3 Urugan pasir t=3cm m3 0.45 265,300.00 119,385.00
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 37.80 217,300.00 8,213,940.00
1 Cat dinding, acrylic emulsi m2 55.08 40,600.00 2,236,248.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 15.00 127,000.00 1,905,000.00
2 List Plafond m1 30.40 26,900.00 817,760.00
3 Cat plafond, acrylic emulsi m2 15.00 40,400.00 606,000.00
Sanitary - -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 4.00 1,393,300.00 5,573,200.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 4.00 312,800.00 1,251,200.00
3 Floor Drain ex. Toto type TX1BN bh 4.00 432,400.00 1,729,600.00
4 Tempat tisue ex. Toto AW360 J bh 4.00 538,100.00 2,152,400.00
5 Gantungan baju ex. Toto type TX704ACW bh 4.00 359,700.00 1,438,800.00
6 Wastafel ex. Toto type LW 640 + kran TX 115 LESN bh 4.00 2,402,400.00 9,609,600.00
7 Meja wastafel rangka baja fin. Granit m1 4.30 822,100.00 3,535,030.00
8 Kaca cermin t= 6 mm, multiplek 9 mm,List stainless steel m2 6.45 350,000.00 2,257,500.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P4 unit 1.00 2,832,600.00 2,832,600.00
2 Pintu type P5 unit 4.00 2,132,700.00 8,530,800.00
3 Pintu type P6 unit 1.00 2,098,100.00 2,098,100.00
Sub jumlah 4.A.2.13 59,414,663.00
14 Toilet (as 7-8/c-d)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 15.00 166,800.00 2,502,000.00
2 Waterproofing coating m2 15.00 133,700.00 2,005,500.00
3 Urugan pasir t=3cm m3 0.45 265,300.00 119,385.00
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 37.80 217,300.00 8,213,940.00
1 Cat dinding, acrylic emulsi m2 55.08 40,600.00 2,236,248.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 15.00 127,000.00 1,905,000.00
2 List Plafond m1 30.40 26,900.00 817,760.00
3 Cat plafond, acrylic emulsi m2 15.00 40,400.00 606,000.00
Sanitary - -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 4.00 1,393,300.00 5,573,200.00

EE GD. REKTORAT Page 47


HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

2 Jet Washer ex. Toto type THX 20 NBPIV bh 4.00 312,800.00 1,251,200.00
3 Floor Drain ex. Toto type TX1BN bh 4.00 432,400.00 1,729,600.00
4 Tempat tisue ex. Toto AW360 J bh 4.00 538,100.00 2,152,400.00
5 Gantungan baju ex. Toto type TX704ACW bh 4.00 359,700.00 1,438,800.00
6 Wastafel ex. Toto type LW 640 + kran TX 115 LESN bh 4.00 2,402,400.00 9,609,600.00
7 Meja wastafel rangka baja fin. Granit m1 4.30 822,100.00 3,535,030.00
8 Kaca cermin t= 6 mm, multiplek 9 mm,List stainless steel m2 6.45 350,000.00 2,257,500.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P4 unit 1.00 2,832,600.00 2,832,600.00
2 Pintu type P5 unit 4.00 2,132,700.00 8,530,800.00
3 Pintu type P6 unit 1.00 2,098,100.00 2,098,100.00
Sub jumlah 4.A.2.14 59,414,663.00
15 Area Tangga (as 5-6/a-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile uk. 30 x 30 cm polished (bordes+anak tangga) m2 63.63 378,900.00 24,109,407.00
2 Pasangan lantai keramik step nozing 10 x 30 m1 66.06 65,700.00 4,340,142.00
Pekerjaan Dinding - -
1 Plint homogeneous tile 10 x 30 cm m1 34.35 41,900.00 1,439,265.00
Pekerjaan Plafond - -
1 Cat plafond, acrylic emulsi m2 34.35 40,400.00 1,387,740.00
Railling - -
1 Pekerjaan railing pipa BSP kombinasi besi tempa fin. Cat Duco m1 26.11 755,000.00 19,713,050.00
2 Pekerjaan hand railing pipa BSP fin. Cat Duco m1 9.07 465,500.00 4,222,085.00
Sub jumlah 4.A.2.15 55,211,689.00
Jumlah 4.A.2 630,402,625.26
Jumlah 4.A 866,846,033.05
B FINISHING EXTERIOR
1 Cat dinding, kolom, balok struktur luar weathershield, acrylic emulsi m2 272.70 40,200.00 10,962,540.00
Sub jumlah 4.B.1 10,962,540.00
Jumlah 4.B 10,962,540.00
V LANTAI DAK ATAP
A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding
1 Pasangan dinding bata merah ukuran tebal ½ bata, campuran spesi 1 Pc : 4 Ps m2 193.60 112,900.00 21,857,440.00
2 Pek. Plesteran m2 387.20 46,100.00 17,849,920.00
3 Pek. Acian m2 387.20 20,900.00 8,092,480.00
4 Kolom praktis + ring balok ukuran 12 x 12 Cm m3 1.44 9,370,200.00 13,452,608.74
Jumlah 5.A.1 61,252,448.74
2 Pekerjaan Finishing
1 Lantai dak atap (as 1-6/a-f)
Pekerjaan Lantai
1 screeding + waterproofing membran m2 271.10 168,500.00 45,680,350.00
Pekerjaan Atap
1 Pek. Atap Metal Deck + rangka pipa BSP m2 435.60 875,600.00 381,411,360.00
Sub jumlah 5.A.2.1 427,091,710.00
B FINISHING EXTERIOR
1 Cat dinding, kolom, balok struktur luar weathershield, acrylic emulsi m2 161.60 40,200.00 6,496,320.00
2 Sign Name Stainless steel plate (tinggi huruf 40 cm) lot 1.00 15,000,000.00 15,000,000.00
Sub jumlah 5.B.1 21,496,320.00
Jumlah 5.B 21,496,320.00

EE GD. REKTORAT Page 48


REKAPITULASI
ENGINEERING ESTIMATE
(EE)
Pekerjaan : Pembangunan Politeknik KP Pangandaran
Lokasi : Pangandaran - Jawa Barat
Thn Anggaran : 2018

JUMLAH HARGA
NO. JENIS PEKERJAAN
(Rp.)

GEDUNG KULIAH
ARSITEKTUR
I LANTAI DASAR
A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding 69,687,329.14
2 Pekerjaan Finishing 688,221,143.39
B FINISHING EXTERIOR 4,873,446.00

II PEKERJAAN LANTAI 1
A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding 203,302,206.46
2 Pekerjaan Finishing 873,994,033.86
B FINISHING EXTERIOR 11,157,912.00

III PEKERJAAN LANTAI 2


A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding 203,302,206.46
2 Pekerjaan Finishing 873,994,033.86
B FINISHING EXTERIOR 11,157,912.00

IV PEKERJAAN LANTAI 3
A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding 203,302,206.46
2 Pekerjaan Finishing 873,994,033.86
B FINISHING EXTERIOR 11,157,912.00

V LANTAI DAK ATAP


A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding 19,856,686.68
2 Pekerjaan Finishing 126,426,845.00
B FINISHING EXTERIOR 17,442,150.00

JUMLAH 4,191,870,057.14
ENGINEERING ESTIMATE
(EE)
Pekerjaan : Pembangunan Politeknik KP Pangandaran
Lokasi : Pangandaran - Jawa Barat
Thn Anggaran : 2018

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

GEDUNG KULIAH
I LANTAI DASAR
A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding
1 Pasangan dinding bata merah ukuran tebal ½ bata, campuran spesi 1 Pc : 4 Ps m2 214.12 112,900.00 24,174,599.60
2 Pek. Plesteran m2 428.25 46,100.00 19,742,232.80
3 Pek. Acian m2 428.25 20,900.00 8,950,383.20
4 Plesteran + acian kolom, balok, dinding, lisplank beton struktur m2 55.30 67,000.00 3,704,832.00
5 Kolom praktis + ring balok ukuran 12 x 12 Cm m3 1.40 9,370,200.00 13,115,281.54
Sub Jumlah 1.A.1 69,687,329.14
2 Pekerjaan Finishing
1 Lt. Dasar (as 1-8/a-f)
Pekerjaan Lantai
1 Plat lantai t=15cm, k-250 m3 103.20 3,475,800.00 358,702,560.00
2 Pasangan Floor hardener m2 688.00 89,400.00 61,507,200.00
Pekerjaan Dinding -
1 Cat dinding dan Kolom, acrylic emulsi m2 293.76 40,600.00 11,926,656.00
Pekerjaan Plafond -
1 Plafond gypsum 9 mm, rangka metal furing m2 688.00 100,900.00 69,419,200.00
2 List Plafond m1 108.80 26,900.00 2,926,720.00
3 Cat plafond, acrylic emulsi m2 688.00 40,400.00 27,795,200.00
Sub Jumlah 1.A.2.1 532,277,536.00
2 Toilet (as 7-8/e-f)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 15.56 166,800.00 2,595,408.00
Pekerjaan Dinding -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 12.56 217,300.00 2,729,288.00
1 Cat dinding, acrylic emulsi m2 3.14 40,600.00 127,484.00
Pekerjaan Plafond -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 15.56 127,000.00 1,976,120.00
2 List Plafond m1 38.56 26,900.00 1,037,264.00
3 Cat plafond, acrylic emulsi m2 15.56 40,400.00 628,624.00
Sanitary -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 4.00 1,393,300.00 5,573,200.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 4.00 312,800.00 1,251,200.00
3 Floor Drain ex. Toto type TX1BN bh 4.00 432,400.00 1,729,600.00
4 Tempat tisue ex. Toto AW360 J bh 4.00 538,100.00 2,152,400.00
5 Gantungan baju ex. Toto type TX704ACW bh 4.00 359,700.00 1,438,800.00
6 Wastafel ex. Toto type LW 640 + kran TX 115 LESN bh 4.00 2,402,400.00 9,609,600.00
7 Meja wastafel rangka baja fin. Granit m1 4.30 822,100.00 3,535,030.00
8 Kaca cermin t= 6 mm, multiplek 9 mm,List stainless steel m2 6.45 350,000.00 2,257,500.00
Pekerjaan Pintu dan jendela -
1 Jendela type J4 unit 4.00 331,700.00 1,326,800.00
1 Pintu type P2 unit 2.00 2,808,300.00 5,616,600.00
2 Pintu type P3 unit 4.00 2,132,700.00 8,530,800.00
3 Pintu type P5 unit 2.00 3,150,900.00 6,301,800.00
Sub Jumlah 1.A.2.2 58,417,518.00
3 Area Tangga (as 7-8/a-b)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile uk. 30 x 30 cm polished (bordes+anak tangga) m2 22.50 378,900.00 8,525,250.00
2 Pasangan lantai keramik step nozing 10 x 30 m1 37.40 65,700.00 2,457,180.00
Pekerjaan Dinding -
1 Cat dinding dan Kolom, acrylic emulsi m2 60.62 40,600.00 2,460,969.00
2 Plint homogeneous tile 10 x 30 cm m1 22.45 41,900.00 940,655.00
Pekerjaan Plafond -
1 Cat plafond, acrylic emulsi m2 28.82 40,600.00 1,170,041.25
Railling -
1 Pekerjaan railing pipa BSP kombinasi besi tempa fin. Cat Duco m1 8.34 755,000.00 6,293,680.00
2 Pekerjaan hand railing pipa BSP fin. Cat Duco m1 12.87 465,500.00 5,990,985.00
Sub Jumlah 1.A.2.3 27,838,760.25
Jumlah 1.A.2 618,533,814.25

EE GD. KULIAH Page 50


HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

Jumlah 1.A 688,221,143.39


B FINISHING EXTERIOR
1 Cat dinding, kolom, balok struktur luar weathershield, acrylic emulsi m2 121.23 40,200.00 4,873,446.00
Sub jumlah 1.B.1 4,873,446.00
Jumlah 1.B 4,873,446.00
II PEKERJAAN LANTAI 1
A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding
1 Pasangan dinding bata merah ukuran tebal ½ bata, campuran spesi 1 Pc : 4 Ps m2 676.60 112,900.00 76,387,914.20
2 Pek. Plesteran m2 1,353.20 46,100.00 62,382,335.60
3 Pek. Acian m1 1,353.20 20,900.00 28,281,796.40
4 Plesteran + acian kolom, balok, dinding, lisplank beton struktur m2 55.30 67,000.00 3,704,832.00
5 Kolom praktis + ring balok ukuran 12 x 12 Cm m3 3.47 9,370,200.00 32,545,328.26
Sub Jumlah 2.A.1 203,302,206.46
2 Pekerjaan Finishing
1 Koridor (as 1-8/a-f)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 110.78 343,700.00 38,075,086.00
2 Plint homogeneous tile 10 x 60 cm m1 104.48 41,000.00 4,283,680.00
3 Urugan pasir t=3cm m3 3.32 265,300.00 881,698.02
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 282.10 40,600.00 11,453,097.60
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 110.78 100,900.00 11,177,702.00
2 List Plafond m1 104.48 26,900.00 2,810,512.00
3 Cat plafond, acrylic emulsi m2 110.78 40,400.00 4,475,512.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J3 unit 1.00 5,481,000.00 5,481,000.00
1 Jendela type J5 unit 3.00 2,773,000.00 8,319,000.00
Sub jumlah 2.A.2.1 86,957,287.62
2 R. Belajar (as 1-3/a-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 76.98 343,700.00 26,458,026.00
2 Plint homogeneous tile 10 x 60 cm m1 39.20 41,000.00 1,607,200.00
3 Urugan pasir t=3cm m3 2.31 265,300.00 612,683.82
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 105.84 40,600.00 4,297,104.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 76.98 100,900.00 7,767,282.00
2 List Plafond m1 39.20 26,900.00 1,054,480.00
3 Cat plafond, acrylic emulsi m2 76.98 40,400.00 3,109,992.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 2.00 4,353,600.00 8,707,200.00
2 Jendela type J2 unit 1.00 4,489,400.00 4,489,400.00
3 Pintu type P1 unit 1.00 4,071,100.00 4,071,100.00
Sub jumlah 2.A.2.2 62,174,467.82
3 R. Belajar (as 3-5/a-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 75.31 343,700.00 25,884,047.00
2 Plint homogeneous tile 10 x 60 cm m1 38.50 41,000.00 1,578,500.00
3 Urugan pasir t=3cm m3 2.26 265,300.00 599,392.29
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 103.95 40,600.00 4,220,370.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 75.31 100,900.00 7,598,779.00
2 List Plafond m1 38.50 26,900.00 1,035,650.00
3 Cat plafond, acrylic emulsi m2 75.31 40,400.00 3,042,524.00
Pekerjaan Pintu dan jendela -
1 Jendela type J1 unit 4.00 4,353,600.00 17,414,400.00
3 Pintu type P1 unit 1.00 4,071,100.00 4,071,100.00
2 Pintu type P7 unit 2.00 22,609,300.00 45,218,600.00
Sub jumlah 2.A.2.3 110,663,362.29
4 R. Belajar (as 5-7/a-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 76.98 343,700.00 26,458,026.00
2 Plint homogeneous tile 10 x 60 cm m1 39.20 41,000.00 1,607,200.00
3 Urugan pasir t=3cm m3 2.31 265,300.00 612,683.82
Pekerjaan Dinding - -

EE GD. KULIAH Page 51


HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

1 Cat dinding, acrylic emulsi m2 105.84 40,600.00 4,297,104.00


Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 76.98 100,900.00 7,767,282.00
2 List Plafond m1 39.20 26,900.00 1,054,480.00
3 Cat plafond, acrylic emulsi m2 76.98 40,400.00 3,109,992.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 2.00 4,353,600.00 8,707,200.00
2 Jendela type J2 unit 1.00 4,489,400.00 4,489,400.00
3 Pintu type P1 unit 1.00 4,071,100.00 4,071,100.00
Sub jumlah 2.A.2.4 62,174,467.82
5 R. Belajar (as 1-3/d-f)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 76.98 343,700.00 26,458,026.00
2 Plint homogeneous tile 10 x 60 cm m1 39.20 41,000.00 1,607,200.00
3 Urugan pasir t=3cm m3 2.31 265,300.00 612,683.82
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 105.84 40,600.00 4,297,104.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 76.98 100,900.00 7,767,282.00
2 List Plafond m1 39.20 26,900.00 1,054,480.00
3 Cat plafond, acrylic emulsi m2 76.98 40,400.00 3,109,992.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 2.00 4,353,600.00 8,707,200.00
2 Jendela type J2 unit 1.00 4,489,400.00 4,489,400.00
3 Pintu type P1 unit 1.00 4,071,100.00 4,071,100.00
Sub jumlah 2.A.2.5 62,174,467.82
6 R. Belajar (as 3-5/d-f)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 75.31 343,700.00 25,884,047.00
2 Plint homogeneous tile 10 x 60 cm m1 38.50 41,000.00 1,578,500.00
3 Urugan pasir t=3cm m3 2.26 265,300.00 599,392.29
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 103.95 40,600.00 4,220,370.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 75.31 100,900.00 7,598,779.00
2 List Plafond m1 38.50 26,900.00 1,035,650.00
3 Cat plafond, acrylic emulsi m2 75.31 40,400.00 3,042,524.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 4.00 4,353,600.00 17,414,400.00
3 Pintu type P1 unit 1.00 4,071,100.00 4,071,100.00
2 Pintu type P7 unit 2.00 22,609,300.00 45,218,600.00
Sub jumlah 2.A.2.6 110,663,362.29
7 R. Belajar (as 5-7/d-f)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 76.98 343,700.00 26,458,026.00
2 Plint homogeneous tile 10 x 60 cm m1 39.20 41,000.00 1,607,200.00
3 Urugan pasir t=3cm m3 2.31 265,300.00 612,683.82
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 105.84 40,600.00 4,297,104.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 76.98 100,900.00 7,767,282.00
2 List Plafond m1 39.20 26,900.00 1,054,480.00
3 Cat plafond, acrylic emulsi m2 76.98 40,400.00 3,109,992.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 2.00 4,353,600.00 8,707,200.00
2 Jendela type J2 unit 1.00 4,489,400.00 4,489,400.00
3 Pintu type P1 unit 1.00 4,071,100.00 4,071,100.00
Sub jumlah 2.A.2.7 62,174,467.82
8 R. Panel (as 7-8/c-e)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 1.31 343,700.00 450,247.00
2 Plint homogeneous tile 10 x 60 cm m1 4.79 41,000.00 196,390.00
3 Urugan pasir t=3cm m3 0.04 265,300.00 10,426.29
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 12.93 40,600.00 525,079.80
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 1.31 100,900.00 132,179.00
2 List Plafond m1 4.79 26,900.00 128,851.00

EE GD. KULIAH Page 52


HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

3 Cat plafond, acrylic emulsi m2 1.31 40,400.00 52,924.00


Pekerjaan Pintu dan jendela - -
1 Pintu type P4 unit 1.00 2,648,700.00 2,648,700.00
Sub jumlah 2.A.2.8 4,144,797.09
9 R. Transit Dosen (as 7-8/c-e)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 7.06 343,700.00 2,426,522.00
2 Plint homogeneous tile 10 x 60 cm m1 10.70 41,000.00 438,700.00
3 Urugan pasir t=3cm m3 0.21 265,300.00 56,190.54
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 28.89 40,600.00 1,172,934.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 7.06 100,900.00 712,354.00
2 List Plafond m1 10.70 26,900.00 287,830.00
3 Cat plafond, acrylic emulsi m2 7.06 40,400.00 285,224.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J3 unit 1.00 5,481,000.00 5,481,000.00
2 Pintu type PJ1 unit 1.00 10,243,900.00 10,243,900.00
Sub jumlah 2.A.2.9 21,104,654.54
10 Toilet (as 7-8/e-f)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 15.56 166,800.00 2,595,408.00
2 Waterproofing coating m2 15.56 133,700.00 2,080,372.00
3 Urugan pasir t=3cm m3 0.47 265,300.00 123,842.04
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 12.56 217,300.00 2,729,288.00
1 Cat dinding, acrylic emulsi m2 3.14 40,600.00 127,484.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 15.56 127,000.00 1,976,120.00
2 List Plafond m1 38.56 26,900.00 1,037,264.00
3 Cat plafond, acrylic emulsi m2 15.56 40,400.00 628,624.00
Sanitary - -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 4.00 1,393,300.00 5,573,200.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 4.00 312,800.00 1,251,200.00
3 Floor Drain ex. Toto type TX1BN bh 4.00 432,400.00 1,729,600.00
4 Tempat tisue ex. Toto AW360 J bh 4.00 538,100.00 2,152,400.00
5 Gantungan baju ex. Toto type TX704ACW bh 4.00 359,700.00 1,438,800.00
6 Wastafel ex. Toto type LW 640 + kran TX 115 LESN bh 4.00 2,402,400.00 9,609,600.00
7 Meja wastafel rangka baja fin. Granit m1 4.30 822,100.00 3,535,030.00
8 Kaca cermin t= 6 mm, multiplek 9 mm,List stainless steel m2 6.45 350,000.00 2,257,500.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J4 unit 4.00 331,700.00 1,326,800.00
1 Pintu type P2 unit 2.00 2,808,300.00 5,616,600.00
2 Pintu type P3 unit 4.00 2,132,700.00 8,530,800.00
3 Pintu type P5 unit 2.00 3,150,900.00 6,301,800.00
Sub jumlah 2.A.2.10 60,621,732.04
11 Area Tangga (as 7-8/a-b) -
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile uk. 30 x 30 cm polished (bordes+anak tangga) m2 22.50 378,900.00 8,525,250.00
2 Pasangan lantai keramik step nozing 10 x 30 m1 37.40 65,700.00 2,457,180.00
Pekerjaan Dinding - -
1 Cat dinding dan Kolom, acrylic emulsi m2 60.62 40,600.00 2,460,969.00
2 Plint homogeneous tile 10 x 30 cm m1 22.45 41,900.00 940,655.00
Pekerjaan Plafond - -
1 Cat plafond, acrylic emulsi m2 28.82 40,600.00 1,170,041.25
Railling - -
1 Pekerjaan railing pipa BSP kombinasi besi tempa fin. Cat Duco m1 8.34 755,000.00 6,293,680.00
2 Pekerjaan hand railing pipa BSP fin. Cat Duco m1 12.87 465,500.00 5,990,985.00
Sub jumlah 2.A.2.11 27,838,760.25
Jumlah 2.A.2 670,691,827.40
Jumlah 2.A 873,994,033.86
B FINISHING EXTERIOR
1 Cat dinding, kolom, balok struktur luar weathershield, acrylic emulsi m2 277.56 40,200.00 11,157,912.00
Sub jumlah 2.B.1 11,157,912.00
Jumlah 2.B 11,157,912.00
III PEKERJAAN LANTAI 2
A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding

EE GD. KULIAH Page 53


HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

1 Pasangan dinding bata merah ukuran tebal ½ bata, campuran spesi 1 Pc : 4 Ps m2 676.60 112,900.00 76,387,914.20
2 Pek. Plesteran m2 1,353.20 46,100.00 62,382,335.60
3 Pek. Acian m1 1,353.20 20,900.00 28,281,796.40
4 Plesteran + acian kolom, balok, dinding, lisplank beton struktur m2 55.30 67,000.00 3,704,832.00
5 Kolom praktis + ring balok ukuran 12 x 12 Cm m3 3.47 9,370,200.00 32,545,328.26
Sub Jumlah 3.A.1 203,302,206.46
2 Pekerjaan Finishing -
1 Koridor (as 1-8/a-f) -
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 110.78 343,700.00 38,075,086.00
2 Plint homogeneous tile 10 x 60 cm m1 104.48 41,000.00 4,283,680.00
3 Urugan pasir t=3cm m3 3.32 265,300.00 881,698.02
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 282.10 40,600.00 11,453,097.60
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 110.78 100,900.00 11,177,702.00
2 List Plafond m1 104.48 26,900.00 2,810,512.00
3 Cat plafond, acrylic emulsi m2 110.78 40,400.00 4,475,512.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J3 unit 1.00 5,481,000.00 5,481,000.00
2 Jendela type J5 unit 3.00 2,773,000.00 8,319,000.00
Sub jumlah 3.A.2.1 86,957,287.62
2 R. Belajar (as 1-3/a-c) -
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 76.98 343,700.00 26,458,026.00
2 Plint homogeneous tile 10 x 60 cm m1 39.20 41,000.00 1,607,200.00
3 Urugan pasir t=3cm m3 2.31 265,300.00 612,683.82
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 105.84 40,600.00 4,297,104.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 76.98 100,900.00 7,767,282.00
2 List Plafond m1 39.20 26,900.00 1,054,480.00
3 Cat plafond, acrylic emulsi m2 76.98 40,400.00 3,109,992.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 2.00 4,353,600.00 8,707,200.00
2 Jendela type J2 unit 1.00 4,489,400.00 4,489,400.00
3 Pintu type P1 unit 1.00 4,071,100.00 4,071,100.00
Sub jumlah 3.A.2.2 62,174,467.82
3 R. Belajar (as 3-5/a-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 75.31 343,700.00 25,884,047.00
2 Plint homogeneous tile 10 x 60 cm m1 38.50 41,000.00 1,578,500.00
3 Urugan pasir t=3cm m3 2.26 265,300.00 599,392.29
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 103.95 40,600.00 4,220,370.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 75.31 100,900.00 7,598,779.00
2 List Plafond m1 38.50 26,900.00 1,035,650.00
3 Cat plafond, acrylic emulsi m2 75.31 40,400.00 3,042,524.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 4.00 4,353,600.00 17,414,400.00
3 Pintu type P1 unit 1.00 4,071,100.00 4,071,100.00
2 Pintu type P7 unit 2.00 22,609,300.00 45,218,600.00
Sub jumlah 3.A.2.3 110,663,362.29
4 R. Belajar (as 5-7/a-c) -
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 76.98 343,700.00 26,458,026.00
2 Plint homogeneous tile 10 x 60 cm m1 39.20 41,000.00 1,607,200.00
3 Urugan pasir t=3cm m3 2.31 265,300.00 612,683.82
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 105.84 40,600.00 4,297,104.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 76.98 100,900.00 7,767,282.00
2 List Plafond m1 39.20 26,900.00 1,054,480.00
3 Cat plafond, acrylic emulsi m2 76.98 40,400.00 3,109,992.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 2.00 4,353,600.00 8,707,200.00
2 Jendela type J2 unit 1.00 4,489,400.00 4,489,400.00

EE GD. KULIAH Page 54


HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

3 Pintu type P1 unit 1.00 4,071,100.00 4,071,100.00


Sub jumlah 3.A.2.4 62,174,467.82
5 R. Belajar (as 1-3/d-f) -
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 76.98 343,700.00 26,458,026.00
2 Plint homogeneous tile 10 x 60 cm m1 39.20 41,000.00 1,607,200.00
3 Urugan pasir t=3cm m3 2.31 265,300.00 612,683.82
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 105.84 40,600.00 4,297,104.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 76.98 100,900.00 7,767,282.00
2 List Plafond m1 39.20 26,900.00 1,054,480.00
3 Cat plafond, acrylic emulsi m2 76.98 40,400.00 3,109,992.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 2.00 4,353,600.00 8,707,200.00
2 Jendela type J2 unit 1.00 4,489,400.00 4,489,400.00
3 Pintu type P1 unit 1.00 4,071,100.00 4,071,100.00
Sub jumlah 3.A.2.5 62,174,467.82
6 R. Belajar (as 3-5/d-f) -
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 75.31 343,700.00 25,884,047.00
2 Plint homogeneous tile 10 x 60 cm m1 38.50 41,000.00 1,578,500.00
3 Urugan pasir t=3cm m3 2.26 265,300.00 599,392.29
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 103.95 40,600.00 4,220,370.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 75.31 100,900.00 7,598,779.00
2 List Plafond m1 38.50 26,900.00 1,035,650.00
3 Cat plafond, acrylic emulsi m2 75.31 40,400.00 3,042,524.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 4.00 4,353,600.00 17,414,400.00
3 Pintu type P1 unit 1.00 4,071,100.00 4,071,100.00
2 Pintu type P7 unit 2.00 22,609,300.00 45,218,600.00
Sub jumlah 3.A.2.6 110,663,362.29
7 R. Belajar (as 5-7/d-f)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 76.98 343,700.00 26,458,026.00
2 Plint homogeneous tile 10 x 60 cm m1 39.20 41,000.00 1,607,200.00
3 Urugan pasir t=3cm m3 2.31 265,300.00 612,683.82
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 105.84 40,600.00 4,297,104.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 76.98 100,900.00 7,767,282.00
2 List Plafond m1 39.20 26,900.00 1,054,480.00
3 Cat plafond, acrylic emulsi m2 76.98 40,400.00 3,109,992.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 2.00 4,353,600.00 8,707,200.00
2 Jendela type J2 unit 1.00 4,489,400.00 4,489,400.00
3 Pintu type P1 unit 1.00 4,071,100.00 4,071,100.00
Sub jumlah 3.A.2.7 62,174,467.82
8 R. Panel (as 7-8/c-e) -
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 1.31 343,700.00 450,247.00
2 Plint homogeneous tile 10 x 60 cm m1 4.79 41,000.00 196,390.00
3 Urugan pasir t=3cm m3 0.04 265,300.00 10,426.29
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 12.93 40,600.00 525,079.80
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 1.31 100,900.00 132,179.00
2 List Plafond m1 4.79 26,900.00 128,851.00
3 Cat plafond, acrylic emulsi m2 1.31 40,400.00 52,924.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P4 unit 1.00 2,648,700.00 2,648,700.00
Sub jumlah 3.A.2.8 4,144,797.09
9 R. Transit Dosen (as 7-8/c-e) -
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 7.06 343,700.00 2,426,522.00
2 Plint homogeneous tile 10 x 60 cm m1 10.70 41,000.00 438,700.00

EE GD. KULIAH Page 55


HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

3 Urugan pasir t=3cm m3 0.21 265,300.00 56,190.54


Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 28.89 40,600.00 1,172,934.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 7.06 100,900.00 712,354.00
2 List Plafond m1 10.70 26,900.00 287,830.00
3 Cat plafond, acrylic emulsi m2 7.06 40,400.00 285,224.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J3 unit 1.00 5,481,000.00 5,481,000.00
2 Pintu type PJ1 unit 1.00 10,243,900.00 10,243,900.00
Sub jumlah 3.A.2.9 21,104,654.54
10 Toilet (as 7-8/e-f) -
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 15.56 166,800.00 2,595,408.00
2 Waterproofing coating m2 15.56 133,700.00 2,080,372.00
3 Urugan pasir t=3cm m3 0.47 265,300.00 123,842.04
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 12.56 217,300.00 2,729,288.00
1 Cat dinding, acrylic emulsi m2 3.14 40,600.00 127,484.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 15.56 127,000.00 1,976,120.00
2 List Plafond m1 38.56 26,900.00 1,037,264.00
3 Cat plafond, acrylic emulsi m2 15.56 40,400.00 628,624.00
Sanitary - -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 4.00 1,393,300.00 5,573,200.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 4.00 312,800.00 1,251,200.00
3 Floor Drain ex. Toto type TX1BN bh 4.00 432,400.00 1,729,600.00
4 Tempat tisue ex. Toto AW360 J bh 4.00 538,100.00 2,152,400.00
5 Gantungan baju ex. Toto type TX704ACW bh 4.00 359,700.00 1,438,800.00
6 Wastafel ex. Toto type LW 640 + kran TX 115 LESN bh 4.00 2,402,400.00 9,609,600.00
7 Meja wastafel rangka baja fin. Granit m1 4.30 822,100.00 3,535,030.00
8 Kaca cermin t= 6 mm, multiplek 9 mm,List stainless steel m2 6.45 350,000.00 2,257,500.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J4 unit 4.00 331,700.00 1,326,800.00
1 Pintu type P2 unit 2.00 2,808,300.00 5,616,600.00
2 Pintu type P3 unit 4.00 2,132,700.00 8,530,800.00
3 Pintu type P5 unit 2.00 3,150,900.00 6,301,800.00
Sub jumlah 3.A.2.10 60,621,732.04
11 Area Tangga (as 7-8/a-b) -
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile uk. 30 x 30 cm polished (bordes+anak tangga) m2 22.50 378,900.00 8,525,250.00
2 Pasangan lantai keramik step nozing 10 x 30 m1 37.40 65,700.00 2,457,180.00
Pekerjaan Dinding - -
1 Cat dinding dan Kolom, acrylic emulsi m2 60.62 40,600.00 2,460,969.00
2 Plint homogeneous tile 10 x 30 cm m1 22.45 41,900.00 940,655.00
Pekerjaan Plafond - -
1 Cat plafond, acrylic emulsi m2 28.82 40,600.00 1,170,041.25
Railling - -
1 Pekerjaan railing pipa BSP kombinasi besi tempa fin. Cat Duco m1 8.34 755,000.00 6,293,680.00
2 Pekerjaan hand railing pipa BSP fin. Cat Duco m1 12.87 465,500.00 5,990,985.00
Sub jumlah 3.A.2.11 27,838,760.25
Jumlah 3.A.2 670,691,827.40
Jumlah 3.A 873,994,033.86
B FINISHING EXTERIOR -
1 Cat dinding, kolom, balok struktur luar weathershield, acrylic emulsi m2 277.56 40,200.00 11,157,912.00
Sub jumlah 3.B.1 11,157,912.00
Jumlah 3.B 11,157,912.00
IV PEKERJAAN LANTAI 3
A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding
1 Pasangan dinding bata merah ukuran tebal ½ bata, campuran spesi 1 Pc : 4 Ps m2 676.60 112,900.00 76,387,914.20
2 Pek. Plesteran m2 1,353.20 46,100.00 62,382,335.60
3 Pek. Acian m1 1,353.20 20,900.00 28,281,796.40
4 Plesteran + acian kolom, balok, dinding, lisplank beton struktur m2 55.30 67,000.00 3,704,832.00
5 Kolom praktis + ring balok ukuran 12 x 12 Cm m3 3.47 9,370,200.00 32,545,328.26
Sub Jumlah 4.A.1 203,302,206.46
2 Pekerjaan Finishing
1 Koridor (as 1-8/a-f)

EE GD. KULIAH Page 56


HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 110.78 343,700.00 38,075,086.00
2 Plint homogeneous tile 10 x 60 cm m1 104.48 41,000.00 4,283,680.00
3 Urugan pasir t=3cm m3 3.32 265,300.00 881,698.02
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 282.10 40,600.00 11,453,097.60
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 110.78 100,900.00 11,177,702.00
2 List Plafond m1 104.48 26,900.00 2,810,512.00
3 Cat plafond, acrylic emulsi m2 110.78 40,400.00 4,475,512.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J3 unit 1.00 5,481,000.00 5,481,000.00
2 Jendela type J5 unit 3.00 2,773,000.00 8,319,000.00
Sub jumlah 4.A.2.1 86,957,287.62
2 R. Belajar (as 1-3/a-c) -
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 76.98 343,700.00 26,458,026.00
2 Plint homogeneous tile 10 x 60 cm m1 39.20 41,000.00 1,607,200.00
3 Urugan pasir t=3cm m3 2.31 265,300.00 612,683.82
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 105.84 40,600.00 4,297,104.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 76.98 100,900.00 7,767,282.00
2 List Plafond m1 39.20 26,900.00 1,054,480.00
3 Cat plafond, acrylic emulsi m2 76.98 40,400.00 3,109,992.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 2.00 4,353,600.00 8,707,200.00
2 Jendela type J2 unit 1.00 4,489,400.00 4,489,400.00
3 Pintu type P1 unit 1.00 4,071,100.00 4,071,100.00
Sub jumlah 4.A.2.2 62,174,467.82
3 R. Belajar (as 3-5/a-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 75.31 343,700.00 25,884,047.00
2 Plint homogeneous tile 10 x 60 cm m1 38.50 41,000.00 1,578,500.00
3 Urugan pasir t=3cm m3 2.26 265,300.00 599,392.29
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 103.95 40,600.00 4,220,370.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 75.31 100,900.00 7,598,779.00
2 List Plafond m1 38.50 26,900.00 1,035,650.00
3 Cat plafond, acrylic emulsi m2 75.31 40,400.00 3,042,524.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 4.00 4,353,600.00 17,414,400.00
3 Pintu type P1 unit 1.00 4,071,100.00 4,071,100.00
2 Pintu type P7 unit 2.00 22,609,300.00 45,218,600.00
Sub jumlah 4.A.2.3 110,663,362.29
4 R. Belajar (as 5-7/a-c) -
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 76.98 343,700.00 26,458,026.00
2 Plint homogeneous tile 10 x 60 cm m1 39.20 41,000.00 1,607,200.00
3 Urugan pasir t=3cm m3 2.31 265,300.00 612,683.82
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 105.84 40,600.00 4,297,104.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 76.98 100,900.00 7,767,282.00
2 List Plafond m1 39.20 26,900.00 1,054,480.00
3 Cat plafond, acrylic emulsi m2 76.98 40,400.00 3,109,992.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 2.00 4,353,600.00 8,707,200.00
2 Jendela type J2 unit 1.00 4,489,400.00 4,489,400.00
3 Pintu type P1 unit 1.00 4,071,100.00 4,071,100.00
Sub jumlah 4.A.2.4 62,174,467.82
5 R. Belajar (as 1-3/d-f)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 76.98 343,700.00 26,458,026.00
2 Plint homogeneous tile 10 x 60 cm m1 39.20 41,000.00 1,607,200.00
3 Urugan pasir t=3cm m3 2.31 265,300.00 612,683.82
Pekerjaan Dinding - -

EE GD. KULIAH Page 57


HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

1 Cat dinding, acrylic emulsi m2 105.84 40,600.00 4,297,104.00


Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 76.98 100,900.00 7,767,282.00
2 List Plafond m1 39.20 26,900.00 1,054,480.00
3 Cat plafond, acrylic emulsi m2 76.98 40,400.00 3,109,992.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 2.00 4,353,600.00 8,707,200.00
2 Jendela type J2 unit 1.00 4,489,400.00 4,489,400.00
3 Pintu type P1 unit 1.00 4,071,100.00 4,071,100.00
Sub jumlah 4.A.2.5 62,174,467.82
6 R. Belajar (as 3-5/d-f) -
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 75.31 343,700.00 25,884,047.00
2 Plint homogeneous tile 10 x 60 cm m1 38.50 41,000.00 1,578,500.00
3 Urugan pasir t=3cm m3 2.26 265,300.00 599,392.29
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 103.95 40,600.00 4,220,370.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 75.31 100,900.00 7,598,779.00
2 List Plafond m1 38.50 26,900.00 1,035,650.00
3 Cat plafond, acrylic emulsi m2 75.31 40,400.00 3,042,524.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 4.00 4,353,600.00 17,414,400.00
3 Pintu type P1 unit 1.00 4,071,100.00 4,071,100.00
2 Pintu type P7 unit 2.00 22,609,300.00 45,218,600.00
Sub jumlah 4.A.2.6 110,663,362.29
7 R. Belajar (as 5-7/d-f) -
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 76.98 343,700.00 26,458,026.00
2 Plint homogeneous tile 10 x 60 cm m1 39.20 41,000.00 1,607,200.00
3 Urugan pasir t=3cm m3 2.31 265,300.00 612,683.82
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 105.84 40,600.00 4,297,104.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 76.98 100,900.00 7,767,282.00
2 List Plafond m1 39.20 26,900.00 1,054,480.00
3 Cat plafond, acrylic emulsi m2 76.98 40,400.00 3,109,992.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 2.00 4,353,600.00 8,707,200.00
2 Jendela type J2 unit 1.00 4,489,400.00 4,489,400.00
3 Pintu type P1 unit 1.00 4,071,100.00 4,071,100.00
Sub jumlah 4.A.2.7 62,174,467.82
8 R. Panel (as 7-8/c-e) -
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 1.31 343,700.00 450,247.00
2 Plint homogeneous tile 10 x 60 cm m1 4.79 41,000.00 196,390.00
3 Urugan pasir t=3cm m3 0.04 265,300.00 10,426.29
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 12.93 40,600.00 525,079.80
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 1.31 100,900.00 132,179.00
2 List Plafond m1 4.79 26,900.00 128,851.00
3 Cat plafond, acrylic emulsi m2 1.31 40,400.00 52,924.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P4 unit 1.00 2,648,700.00 2,648,700.00
Sub jumlah 4.A.2.8 4,144,797.09
9 R. Transit Dosen (as 7-8/c-e) -
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 7.06 343,700.00 2,426,522.00
2 Plint homogeneous tile 10 x 60 cm m1 10.70 41,000.00 438,700.00
3 Urugan pasir t=3cm m3 0.21 265,300.00 56,190.54
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 28.89 40,600.00 1,172,934.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 7.06 100,900.00 712,354.00
2 List Plafond m1 10.70 26,900.00 287,830.00
3 Cat plafond, acrylic emulsi m2 7.06 40,400.00 285,224.00
Pekerjaan Pintu dan jendela - -

EE GD. KULIAH Page 58


HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

1 Jendela type J3 unit 1.00 5,481,000.00 5,481,000.00


2 Pintu type PJ1 unit 1.00 10,243,900.00 10,243,900.00
Sub jumlah 4.A.2.9 21,104,654.54
10 Toilet (as 7-8/e-f) -
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 15.56 166,800.00 2,595,408.00
2 Waterproofing coating m2 15.56 133,700.00 2,080,372.00
3 Urugan pasir t=3cm m3 0.47 265,300.00 123,842.04
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 12.56 217,300.00 2,729,288.00
1 Cat dinding, acrylic emulsi m2 3.14 40,600.00 127,484.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 15.56 127,000.00 1,976,120.00
2 List Plafond m1 38.56 26,900.00 1,037,264.00
3 Cat plafond, acrylic emulsi m2 15.56 40,400.00 628,624.00
Sanitary - -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 4.00 1,393,300.00 5,573,200.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 4.00 312,800.00 1,251,200.00
3 Floor Drain ex. Toto type TX1BN bh 4.00 432,400.00 1,729,600.00
4 Tempat tisue ex. Toto AW360 J bh 4.00 538,100.00 2,152,400.00
5 Gantungan baju ex. Toto type TX704ACW bh 4.00 359,700.00 1,438,800.00
6 Wastafel ex. Toto type LW 640 + kran TX 115 LESN bh 4.00 2,402,400.00 9,609,600.00
7 Meja wastafel rangka baja fin. Granit m1 4.30 822,100.00 3,535,030.00
8 Kaca cermin t= 6 mm, multiplek 9 mm,List stainless steel m2 6.45 350,000.00 2,257,500.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J4 unit 4.00 331,700.00 1,326,800.00
1 Pintu type P2 unit 2.00 2,808,300.00 5,616,600.00
2 Pintu type P3 unit 4.00 2,132,700.00 8,530,800.00
3 Pintu type P5 unit 2.00 3,150,900.00 6,301,800.00
Sub jumlah 4.A.2.10 60,621,732.04
11 Area Tangga (as 7-8/a-b) -
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile uk. 30 x 30 cm polished (bordes+anak tangga) m2 22.50 378,900.00 8,525,250.00
2 Pasangan lantai keramik step nozing 10 x 30 m1 37.40 65,700.00 2,457,180.00
Pekerjaan Dinding - -
1 Cat dinding dan Kolom, acrylic emulsi m2 60.62 40,600.00 2,460,969.00
2 Plint homogeneous tile 10 x 30 cm m1 22.45 41,900.00 940,655.00
Pekerjaan Plafond - -
1 Cat plafond, acrylic emulsi m2 28.82 40,600.00 1,170,041.25
Railling - -
1 Pekerjaan railing pipa BSP kombinasi besi tempa fin. Cat Duco m1 8.34 755,000.00 6,293,680.00
2 Pekerjaan hand railing pipa BSP fin. Cat Duco m1 12.87 465,500.00 5,990,985.00
Sub jumlah 4.A.2.11 27,838,760.25
Jumlah 4.A.2 670,691,827.40
Jumlah 4.A 873,994,033.86
B FINISHING EXTERIOR -
1 Cat dinding, kolom, balok struktur luar weathershield, acrylic emulsi m2 277.56 40,200.00 11,157,912.00
Sub jumlah 4.B.1 11,157,912.00
Jumlah 4.B 11,157,912.00
V LANTAI DAK ATAP
A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding
1 Pasangan dinding bata merah ukuran tebal ½ bata, campuran spesi 1 Pc : 4 Ps m2 60.75 112,900.00 6,858,675.00
2 Pek. Plesteran m2 121.50 46,100.00 5,601,150.00
3 Pek. Acian m2 121.50 20,900.00 2,539,350.00
4 Kolom praktis + ring balok ukuran 12 x 12 Cm m3 0.52 9,370,200.00 4,857,511.68
Jumlah 5.A.1 19,856,686.68
2 Pekerjaan Finishing
1 Lantai dak atap (as 1-8/a-f)
Pekerjaan Lantai
1 screeding + waterproofing membran m2 735.67 168,500.00 123,960,395.00
Pekerjaan Dinding -
1 Cat dinding dan Kolom, acrylic emulsi m2 60.75 40,600.00 2,466,450.00
Sub jumlah 5.A.2.1 126,426,845.00
B FINISHING EXTERIOR -
1 Cat dinding, kolom, balok struktur luar weathershield, acrylic emulsi m2 60.75 40,200.00 2,442,150.00
2 Sign Name Stainless steel plate lot 1.00 15,000,000.00 15,000,000.00
Sub jumlah 5.B.1 17,442,150.00

EE GD. KULIAH Page 59


HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

Jumlah 5.B 17,442,150.00

EE GD. KULIAH Page 60


REKAPITULASI

ENGINEERING ESTIMATE

(EE)

Pekerjaan : Pembangunan Politeknik KP Pangandaran


Lokasi : Pangandaran - Jawa Barat
Thn Anggaran : 2018

JUMLAH HARGA
NO. JENIS PEKERJAAN (Rp.)

GEDUNG ASRAMA PUTRI


ARSITEKTUR
1 LANTAI DASAR
A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding 117,944,617.53
2 Pekerjaan Finishing 630,283,070.76
B FINISHING EXTERIOR 7,397,181.90

2 LANTAI SATU
A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding 330,434,434.74
2 Pekerjaan Finishing 760,345,912.05
B FINISHING EXTERIOR 11,031,402.60

3 LANTAI DUA
A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding 330,434,434.74
2 Pekerjaan Finishing 738,358,554.78
B FINISHING EXTERIOR 11,031,402.60

4 LANTAI DAK ATAP


A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding 56,486,228.26
2 Pekerjaan Finishing 243,202,393.30
B FINISHING EXTERIOR 22,732,148.40

JUMLAH 3,259,681,781.65
ENGINEERING ESTIMATE
(EE)
Pekerjaan : Pembangunan Politeknik KP Pangandaran
Lokasi : Pangandaran - Jawa Barat
Thn Anggaran : 2018

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

GEDUNG ASRAMA PUTRI


1 LANTAI DASAR
A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding
1 Pasangan dinding bata merah ukuran tebal ½ bata, campuran spesi 1 Pc : 4 Ps m2 295.76 112,900.00 33,391,772.54
2 Pek. Plesteran m2 591.53 46,100.00 27,269,454.63
3 Pek. Acian m2 591.53 20,900.00 12,362,941.47
4 Pek. Rooster beton m2 56.00 303,500.00 16,996,000.00
5 Plesteran + acian kolom, balok, dinding, lisplank beton struktur m2 76.03 67,000.00 5,094,144.00
6 Kolom praktis + ring balok ukuran 12 x 12 Cm m3 2.44 9,370,200.00 22,830,304.90
Sub Jumlah 1.A.1 117,944,617.53
2 Pekerjaan Finishing
1 Lantai dasar dan r. Makan (as 1-12/a-d)
Pekerjaan Lantai
1 Plat lantai t=15cm, k-250 m3 69.70 3,475,800.00 242,271,515.03
2 Pasangan Floor hardener m2 464.68 89,400.00 41,542,615.50
Pekerjaan Dinding -
1 Cat dinding dan Kolom, acrylic emulsi m2 268.77 40,600.00 10,912,062.00
Pekerjaan Plafond -
1 Plafond gypsum 9 mm, rangka metal furing m2 464.68 100,900.00 46,886,464.25
2 List Plafond m1 111.55 26,900.00 3,000,695.00
3 Cat plafond, acrylic emulsi m2 464.68 40,400.00 18,773,173.00
Sanitary -
1 Wastafel ex. Toto type LW 640 + kran TX 115 LESN bh 2.00 2,402,400.00 4,804,800.00
2 Tempat sabun ex. Toto S161 bh 2.00 96,900.00 193,800.00
3 Meja beton lapis granit m2 12.21 822,100.00 10,037,841.00
4 Kaca cermin t= 6 mm, multiplek 9 mm,List stainless steel m2 2.25 350,000.00 787,500.00
5 Kran Ex. Toto type. TX609 bh 16.00 284,000.00 4,544,000.00
Sub Jumlah 1.A.2.1 383,754,465.78
2 R. Chef (as 3-4/c-d)
Pekerjaan Lantai
1 Plat lantai t=15cm, k-250 m3 0.50 3,475,800.00 1,746,589.50
2 Pasangan Floor hardener m2 3.35 89,400.00 299,490.00
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 25.94 40,600.00 1,053,164.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 3.35 100,900.00 338,015.00
2 List Plafond m1 7.80 26,900.00 209,820.00
3 Cat plafond, acrylic emulsi m2 3.35 40,400.00 135,340.00
Pekerjaan Pintu dan jendela -
1 Pintu type P4 unit 1.00 2,258,200.00 2,258,200.00
Sub Jumlah 1.A.2.2 6,040,618.50
3 Gudang Makanan Beku (as 3-4/c-d)
Pekerjaan Lantai
1 Plat lantai t=15cm, k-250 m3 0.84 3,475,800.00 2,932,706.25
2 Pasangan Floor hardener m2 5.63 89,400.00 502,875.00
Pekerjaan Dinding -
1 Cat dinding, acrylic emulsi m2 34.20 40,600.00 1,388,520.00
Pekerjaan Plafond -
1 Plafond gypsum 9 mm, rangka metal furing m2 5.63 100,900.00 567,562.50
2 List Plafond m1 9.50 26,900.00 255,550.00
3 Cat plafond, acrylic emulsi m2 5.63 40,400.00 227,250.00
Pekerjaan Pintu dan jendela -
1 Pintu type P4 unit 1.00 2,258,200.00 2,258,200.00
Sub Jumlah 1.A.2.3 8,132,663.75
4 Gudang Makanan (as 4-5/c-d)
Pekerjaan Lantai
1 Plat lantai t=15cm, k-250 m3 0.81 3,475,800.00 2,815,398.00
2 Pasangan Floor hardener m2 5.40 89,400.00 482,760.00
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 41.04 40,600.00 1,666,224.00

EE GD. ASM PUTRI Page 62


HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 5.40 100,900.00 544,860.00
2 List Plafond m1 11.40 26,900.00 306,660.00
3 Cat plafond, acrylic emulsi m2 5.40 40,400.00 218,160.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P4 unit 1.00 2,258,200.00 2,258,200.00
Sub Jumlah 1.A.2.4 8,292,262.00
5 T. Cuci Alat (as 4-5/c-d)
Pekerjaan Lantai
1 Plat lantai t=15cm, k-250 m3 0.84 3,475,800.00 2,932,706.25
2 Pasangan Floor hardener m2 5.63 89,400.00 502,875.00
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 34.20 40,600.00 1,388,520.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 5.63 100,900.00 567,562.50
2 List Plafond m1 9.50 26,900.00 255,550.00
3 Cat plafond, acrylic emulsi m2 5.63 40,400.00 227,250.00
Sanitary -
1 Meja beton lapis granit m2 3.85 822,100.00 3,165,085.00
Sub Jumlah 1.A.2.5 9,039,548.75
6 T. Cuci Piring (as 4-5/c-d)
Pekerjaan Lantai
1 Plat lantai t=15cm, k-250 m3 0.84 3,475,800.00 2,932,706.25
2 Pasangan Floor hardener m2 5.63 89,400.00 502,875.00
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 34.20 40,600.00 1,388,520.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 5.63 100,900.00 567,562.50
2 List Plafond m1 9.50 26,900.00 255,550.00
3 Cat plafond, acrylic emulsi m2 5.63 40,400.00 227,250.00
Sanitary - -
1 Meja beton lapis granit m2 3.85 822,100.00 3,165,085.00
Sub Jumlah 1.A.2.6 9,039,548.75
7 Selasar Gudang (as 3-5/c-d)
Pekerjaan Lantai
1 Plat lantai t=15cm, k-250 m3 3.04 3,475,800.00 10,557,742.50
2 Pasangan Floor hardener m2 20.25 89,400.00 1,810,350.00
Pekerjaan Dinding -
1 Cat dinding, acrylic emulsi m2 120.60 40,600.00 4,896,360.00
Pekerjaan Plafond -
1 Plafond gypsum 9 mm, rangka metal furing m2 20.25 100,900.00 2,043,225.00
2 List Plafond m1 33.50 26,900.00 901,150.00
3 Cat plafond, acrylic emulsi m2 20.25 40,400.00 818,100.00
Pekerjaan Pintu dan jendela -
1 Pintu type P2 unit 2.00 4,872,300.00 9,744,600.00
Sub Jumlah 1.A.2.7 30,771,527.50
8 Area Masak dan tempat saji (as 5-8/c-d)
Pekerjaan Lantai
1 Plat lantai t=15cm, k-250 m3 10.73 3,475,800.00 37,304,023.50
2 Pasangan Floor hardener m2 71.55 89,400.00 6,396,570.00
Pekerjaan Dinding -
1 Cat dinding, acrylic emulsi m2 118.98 40,600.00 4,830,588.00
Pekerjaan Plafond -
1 Plafond gypsum 9 mm, rangka metal furing m2 71.55 100,900.00 7,219,395.00
2 List Plafond m1 36.30 26,900.00 976,470.00
3 Cat plafond, acrylic emulsi m2 71.55 40,400.00 2,890,620.00
Sanitary - -
1 Meja beton lapis granit m2 13.80 822,100.00 11,344,980.00
Perlengkapan - -
1 Grill alumunium m1 8.35 450,000.00 3,757,500.00
Sub Jumlah 1.A.2.8 74,720,146.50
9 R. Chef (as 3-4/c-d)
Pekerjaan Lantai
1 Plat lantai t=15cm, k-250 m3 0.50 3,475,800.00 1,746,589.50
2 Pasangan Floor hardener m2 3.35 89,400.00 299,490.00
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 25.94 40,600.00 1,053,164.00
Pekerjaan Plafond - -

EE GD. ASM PUTRI Page 63


HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

1 Plafond gypsum 9 mm, rangka metal furing m2 3.35 100,900.00 338,015.00


2 List Plafond m1 7.80 26,900.00 209,820.00
3 Cat plafond, acrylic emulsi m2 3.35 40,400.00 135,340.00
Pekerjaan Pintu dan jendela -
1 Pintu type P4 unit 1.00 2,258,200.00 2,258,200.00
Sub Jumlah 1.A.2.9 6,040,618.50
10 Gudang (as 2-3/c-d)
Pekerjaan Lantai
1 Plat lantai t=15cm, k-250 m3 1.96 3,475,800.00 6,809,092.20
2 Pasangan Floor hardener m2 13.06 89,400.00 1,167,564.00
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 50.28 40,600.00 2,041,165.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 13.06 100,900.00 1,317,754.00
2 List Plafond m1 15.65 26,900.00 420,985.00
3 Cat plafond, acrylic emulsi m2 13.06 40,400.00 527,624.00
Pekerjaan Pintu dan jendela -
1 Pintu type P4 unit 1.00 2,258,200.00 2,258,200.00
Sub Jumlah 1.A.2.10 14,542,384.20
11 KM/WC (as 2-3/c-d)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 4.20 166,800.00 700,560.00
Pekerjaan Dinding -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 26.00 217,300.00 5,649,800.00
1 Cat dinding, acrylic emulsi m2 11.90 40,600.00 483,140.00
Pekerjaan Plafond -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 4.20 127,000.00 533,400.00
2 List Plafond m1 17.00 26,900.00 457,300.00
3 Cat plafond, acrylic emulsi m2 4.20 40,400.00 169,680.00
Sanitary -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 4.00 1,393,300.00 5,573,200.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 4.00 312,800.00 1,251,200.00
3 Floor Drain ex. Toto type TX1BN bh 4.00 432,400.00 1,729,600.00
4 Tempat tisue ex. Toto AW360 J bh 4.00 538,100.00 2,152,400.00
5 Gantungan baju ex. Toto type TX704ACW bh 4.00 359,700.00 1,438,800.00
Pekerjaan Pintu dan jendela -
1 Pintu type P5 unit 4.00 2,115,200.00 8,460,800.00
Sub Jumlah 1.A.2.11 28,599,880.00
11 Area Tangga (as 1-2/a-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile uk. 30 x 30 cm polished (bordes+anak tangga) m2 24.31 378,900.00 9,212,517.77
2 Pasangan lantai keramik step nozing 10 x 30 m1 41.73 65,700.00 2,741,332.50
Pekerjaan Dinding -
1 Plint homogeneous tile 10 x 30 cm m1 17.08 41,900.00 715,652.00
Pekerjaan Plafond -
1 Cat plafond, acrylic emulsi m2 17.34 40,400.00 700,536.00
Railling -
1 Pekerjaan railing pipa BSP kombinasi besi tempa fin. Cat Duco m1 8.34 755,000.00 6,293,680.00
2 Pekerjaan hand railing pipa BSP fin. Cat Duco m1 12.87 465,500.00 5,990,985.00
Sub Jumlah 1.A.2.11 25,654,703.27
12 Area Tangga (as 11-12/a-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile uk. 30 x 30 cm polished (bordes+anak tangga) m2 24.31 378,900.00 9,212,517.77
2 Pasangan lantai keramik step nozing 10 x 30 m1 41.73 65,700.00 2,741,332.50
Pekerjaan Dinding -
2 Plint homogeneous tile 10 x 30 cm m1 17.08 41,900.00 715,652.00
Pekerjaan Plafond -
1 Cat plafond, acrylic emulsi m2 17.34 40,400.00 700,536.00
Railling -
1 Pekerjaan railing pipa BSP kombinasi besi tempa fin. Cat Duco m1 8.34 755,000.00 6,293,680.00
2 Pekerjaan hand railing pipa BSP fin. Cat Duco m1 12.87 465,500.00 5,990,985.00
Sub Jumlah 1.A.2.12 25,654,703.27
Jumlah 1.A.2 630,283,070.76
Jumlah 1.A 748,227,688.29
B FINISHING EXTERIOR
1 Cat dinding, kolom, balok struktur luar weathershield, acrylic emulsi m2 184.01 40,200.00 7,397,181.90
Sub jumlah 1.B.1 7,397,181.90
Jumlah 1.B 7,397,181.90

EE GD. ASM PUTRI Page 64


HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

2 LANTAI SATU
A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding
1 Pasangan dinding bata merah ukuran tebal ½ bata, campuran spesi 1 Pc : 4 Ps m2 1,088.17 112,900.00 122,854,460.74
2 Pek. Plesteran m2 2,176.34 46,100.00 100,329,329.32
3 Pek. Acian m1 2,176.34 20,900.00 45,485,531.08
4 Plesteran + acian kolom, balok, dinding, lisplank beton struktur m2 76.03 67,000.00 5,094,144.00
5 Kolom praktis + ring balok ukuran 12 x 12 Cm m3 6.05 9,370,200.00 56,670,969.60
Sub Jumlah 2.A.1 330,434,434.74
2 Pekerjaan Finishing
1 Koridor (as 2-11/b-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 81.99 343,700.00 28,179,963.00
2 Plint homogeneous tile 10 x 60 cm m1 87.26 41,000.00 3,577,660.00
3 Urugan pasir t=3cm m3 2.46 265,300.00 652,558.41
Pekerjaan Dinding -
1 Cat dinding, acrylic emulsi m2 235.60 40,600.00 9,565,441.20
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 81.99 100,900.00 8,272,791.00
2 List Plafond m1 87.26 26,900.00 2,347,294.00
3 Cat plafond, acrylic emulsi m2 81.99 40,400.00 3,312,396.00
Pekerjaan Pintu dan jendela -
1 Jendela type J2 unit 2.00 750,400.00 1,500,800.00
2 Pintu type P6 unit 4.00 3,612,900.00 14,451,600.00
3 Pintu type P7 unit 2.00 3,119,600.00 6,239,200.00
Sub jumlah 2.A.2.1 78,099,703.61
2 Shower (as 2-3/a-b)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 6.50 166,800.00 1,084,200.00
2 Waterproofing coating m2 6.50 133,700.00 869,050.00
3 Urugan pasir t=3cm m3 0.20 265,300.00 51,733.50
Pekerjaan Dinding -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 37.65 217,300.00 8,181,345.00
1 Cat dinding, acrylic emulsi m2 15.75 40,600.00 639,450.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 6.50 127,000.00 825,500.00
2 List Plafond m1 22.50 26,900.00 605,250.00
3 Cat plafond, acrylic emulsi m2 6.50 40,400.00 262,600.00
Sanitary -
1 Shower TOTO TX 492 SG bh 5.00 954,800.00 4,774,000.00
2 Floor Drain ex. Toto type TX1BN bh 5.00 432,400.00 2,162,000.00
3 Tempat sabun ex. Toto S161 bh 5.00 96,900.00 484,500.00
4 Gantungan baju ex. Toto type TX704ACW bh 5.00 359,700.00 1,798,500.00
Pekerjaan Pintu dan jendela -
1 Jendela type J3 unit 1.00 329,700.00 329,700.00
2 Pintu type P5 unit 5.00 2,115,200.00 10,576,000.00
3 Pintu type P6 unit 1.00 3,612,900.00 3,612,900.00
Sub jumlah 2.A.2.2 36,256,728.50
3 Selasar Shower (as 2-3/a-b)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 20 x 20 cm unpolished m2 5.81 166,800.00 969,108.00
2 Waterproofing coating m2 5.81 133,700.00 776,797.00
3 Urugan pasir t=3cm m3 0.17 265,300.00 46,241.79
Pekerjaan Dinding -
1 Cat dinding, acrylic emulsi m2 24.50 40,600.00 994,497.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 5.81 127,000.00 737,870.00
2 List Plafond m1 11.95 26,900.00 321,455.00
3 Cat plafond, acrylic emulsi m2 5.81 40,400.00 234,724.00
Pekerjaan Pintu dan jendela -
1 Jendela type J3 unit 1.00 329,700.00 329,700.00
2 Pintu type P3 unit 1.00 2,807,100.00 2,807,100.00
Sub jumlah 2.A.2.3 7,217,492.79
4 R. Panel (as 3-4/a-b)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 4.71 343,700.00 1,618,827.00
2 Plint homogeneous tile 10 x 60 cm m1 8.40 41,000.00 344,400.00
3 Urugan pasir t=3cm m3 0.14 265,300.00 37,486.89

EE GD. ASM PUTRI Page 65


HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 27.87 40,600.00 1,131,522.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 4.71 100,900.00 475,239.00
2 List Plafond m1 9.30 26,900.00 250,170.00
3 Cat plafond, acrylic emulsi m2 4.71 40,400.00 190,284.00
Pekerjaan Pintu dan jendela -
1 Pintu type P3 unit 1.00 2,807,100.00 2,807,100.00
Sub jumlah 2.A.2.4 6,855,028.89
5 R. Tidur Pembina (as 3-4/a-b)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 12.31 343,700.00 4,230,947.00
2 Plint homogeneous tile 10 x 60 cm m1 14.55 41,000.00 596,550.00
3 Urugan pasir t=3cm m3 0.37 265,300.00 97,975.29
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 37.28 40,600.00 1,513,669.50
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 12.31 100,900.00 1,242,079.00
2 List Plafond m1 16.15 26,900.00 434,435.00
3 Cat plafond, acrylic emulsi m2 12.31 40,400.00 497,324.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
2 Pintu type P1 unit 1.00 2,828,800.00 2,828,800.00
Sub jumlah 2.A.2.5 15,539,979.79
6 KM/WC (as 3-4/a-b)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 4.36 166,800.00 727,248.00
2 Waterproofing coating m2 4.36 133,700.00 582,932.00
3 Urugan pasir t=3cm m3 0.13 265,300.00 34,701.24
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 17.90 217,300.00 3,889,670.00
1 Cat dinding, acrylic emulsi m2 6.27 40,600.00 254,359.00
Pekerjaan Plafond -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 4.36 127,000.00 553,720.00
2 List Plafond m1 8.95 26,900.00 240,755.00
3 Cat plafond, acrylic emulsi m2 4.36 40,400.00 176,144.00
Sanitary -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 1.00 1,393,300.00 1,393,300.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 1.00 312,800.00 312,800.00
3 Wastafel ex. Toto type LW 640 + kran TX 115 LESN bh 1.00 2,402,400.00 2,402,400.00
4 Shower TOTO TX 492 SG bh 1.00 954,800.00 954,800.00
5 Floor Drain ex. Toto type TX1BN bh 1.00 432,400.00 432,400.00
6 Tempat tisue ex. Toto AW360 J bh 1.00 538,100.00 538,100.00
7 Tempat sabun ex. Toto S161 bh 1.00 96,900.00 96,900.00
8 Gantungan baju ex. Toto type TX704ACW bh 1.00 359,700.00 359,700.00
9 Meja wastafel rangka baja fin. Granit m1 0.80 822,100.00 657,680.00
10 Kaca cermin t= 6 mm, multiplek 9 mm,List stainless steel m2 1.13 350,000.00 393,750.00
11 Bak Mandi fiber lapis keramik unit 1.00 2,003,300.00 2,003,300.00
Pekerjaan Pintu dan jendela -
1 Jendela type J3 unit 1.00 329,700.00 329,700.00
2 Pintu type P5 unit 1.00 2,115,200.00 2,115,200.00
Sub jumlah 2.A.2.6 18,449,559.24
7 R. Tidur Asrama (as 4-6/a-b)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 45.70 343,700.00 15,707,090.00
2 Plint homogeneous tile 10 x 60 cm m1 27.30 41,000.00 1,119,300.00
3 Urugan pasir t=3cm m3 1.37 265,300.00 363,726.30
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 62.94 40,600.00 2,555,364.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 45.70 100,900.00 4,611,130.00
2 List Plafond m1 29.10 26,900.00 782,790.00
3 Cat plafond, acrylic emulsi m2 45.70 40,400.00 1,846,280.00
Pekerjaan Pintu dan jendela -
1 Jendela type J1 unit 4.00 4,098,200.00 16,392,800.00
2 Pintu type P1 unit 2.00 2,828,800.00 5,657,600.00
Sub jumlah 2.A.2.7 49,036,080.30
8 R. Bersama (as 6-7/a-b)

EE GD. ASM PUTRI Page 66


HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 21.10 343,700.00 7,252,070.00
2 Plint homogeneous tile 10 x 60 cm m1 16.35 41,000.00 670,350.00
3 Urugan pasir t=3cm m3 0.63 265,300.00 167,934.90
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 32.30 40,600.00 1,311,177.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 21.10 100,900.00 2,128,990.00
2 List Plafond m1 19.50 26,900.00 524,550.00
3 Cat plafond, acrylic emulsi m2 21.10 40,400.00 852,440.00
Pekerjaan Pintu dan jendela -
1 Jendela type J1 unit 4.00 4,098,200.00 16,392,800.00
2 Pintu type P6 unit 2.00 3,612,900.00 7,225,800.00
Sub jumlah 2.A.2.8 36,526,111.90
9 R. Tidur Asrama (as 7-9/a-b)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 45.70 343,700.00 15,707,090.00
2 Plint homogeneous tile 10 x 60 cm m1 27.30 41,000.00 1,119,300.00
3 Urugan pasir t=3cm m3 1.37 265,300.00 363,726.30
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 62.76 40,600.00 2,548,056.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 45.70 100,900.00 4,611,130.00
2 List Plafond m1 29.10 26,900.00 782,790.00
3 Cat plafond, acrylic emulsi m2 45.70 40,400.00 1,846,280.00
Pekerjaan Pintu dan jendela -
1 Jendela type J1 unit 4.00 4,098,200.00 16,392,800.00
2 Pintu type P1 unit 2.00 2,828,800.00 5,657,600.00
Sub jumlah 2.A.2.9 49,028,772.30
10 R. Tidur Pembina (as 9-10/a-b)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 12.31 343,700.00 4,230,947.00
2 Plint homogeneous tile 10 x 60 cm m1 14.55 41,000.00 596,550.00
3 Urugan pasir t=3cm m3 1.37 265,300.00 363,726.30
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 37.28 40,600.00 1,513,669.50
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 12.31 100,900.00 1,242,079.00
2 List Plafond m1 16.15 26,900.00 434,435.00
3 Cat plafond, acrylic emulsi m2 12.31 40,400.00 497,324.00
Pekerjaan Pintu dan jendela -
1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
2 Pintu type P1 unit 1.00 2,828,800.00 2,828,800.00
Sub jumlah 2.A.2.10 15,805,730.80
11 R. Peralatan (as 9-10/a-b)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 4.71 343,700.00 1,618,827.00
2 Plint homogeneous tile 10 x 60 cm m1 8.40 41,000.00 344,400.00
3 Urugan pasir t=3cm m3 0.14 265,300.00 37,486.89
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 23.13 40,600.00 939,078.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 4.71 100,900.00 475,239.00
2 List Plafond m1 9.30 26,900.00 250,170.00
3 Cat plafond, acrylic emulsi m2 4.71 40,400.00 190,284.00
Pekerjaan Pintu dan jendela -
1 Pintu type P3 unit 1.00 2,807,100.00 2,807,100.00
Sub jumlah 2.A.2.11 6,662,584.89
12 KM/WC (as 9-10/a-b)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 4.36 166,800.00 727,248.00
2 Waterproofing coating m2 4.36 133,700.00 582,932.00
3 Urugan pasir t=3cm m3 0.13 265,300.00 34,701.24
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 16.36 217,300.00 3,555,028.00
2 Cat dinding, acrylic emulsi m2 6.27 40,600.00 254,359.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 4.36 127,000.00 553,720.00

EE GD. ASM PUTRI Page 67


HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

2 List Plafond m1 8.95 26,900.00 240,755.00


3 Cat plafond, acrylic emulsi m2 4.36 40,400.00 176,144.00
Sanitary - -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 1.00 1,393,300.00 1,393,300.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 1.00 312,800.00 312,800.00
3 Wastafel ex. Toto type LW 640 + kran TX 115 LESN bh 1.00 2,402,400.00 2,402,400.00
4 Shower TOTO TX 492 SG bh 1.00 954,800.00 954,800.00
5 Floor Drain ex. Toto type TX1BN bh 1.00 432,400.00 432,400.00
6 Tempat tisue ex. Toto AW360 J bh 1.00 538,100.00 538,100.00
7 Tempat sabun ex. Toto S161 bh 1.00 96,900.00 96,900.00
8 Gantungan baju ex. Toto type TX704ACW bh 1.00 359,700.00 359,700.00
9 Meja wastafel rangka baja fin. Granit m1 0.80 822,100.00 657,680.00
10 Kaca cermin t= 6 mm, multiplek 9 mm,List stainless steel m2 1.13 350,000.00 393,750.00
11 Bak Mandi fiber lapis keramik unit 1.00 2,003,300.00 2,003,300.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J3 unit 1.00 329,700.00 329,700.00
2 Pintu type P5 unit 1.00 2,115,200.00 2,115,200.00
Sub jumlah 2.A.2.12 18,114,917.24
13 Shower (as 10-11/a-b)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 6.50 166,800.00 1,084,200.00
2 Waterproofing coating m2 6.50 133,700.00 869,050.00
3 Urugan pasir t=3cm m3 0.20 265,300.00 51,733.50
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 37.65 217,300.00 8,181,345.00
2 Cat dinding, acrylic emulsi m2 15.75 40,600.00 639,450.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 6.50 127,000.00 825,500.00
2 List Plafond m1 22.50 26,900.00 605,250.00
3 Cat plafond, acrylic emulsi m2 6.50 40,400.00 262,600.00
Sanitary -
1 Shower TOTO TX 492 SG bh 5.00 954,800.00 4,774,000.00
2 Floor Drain ex. Toto type TX1BN bh 5.00 432,400.00 2,162,000.00
3 Tempat sabun ex. Toto S161 bh 5.00 96,900.00 484,500.00
4 Gantungan baju ex. Toto type TX704ACW bh 5.00 359,700.00 1,798,500.00
Pekerjaan Pintu dan jendela -
1 Jendela type J3 unit 1.00 329,700.00 329,700.00
2 Pintu type P5 unit 5.00 2,115,200.00 10,576,000.00
3 Pintu type P6 unit 1.00 3,612,900.00 3,612,900.00
Sub jumlah 2.A.2.13 36,256,728.50
14 Selasar Shower (as 10-11/a-b)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 7.31 166,800.00 1,219,408.08
2 Waterproofing coating m2 7.31 133,700.00 977,427.22
3 Urugan pasir t=3cm m3 0.22 265,300.00 58,185.07
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 23.45 217,300.00 5,095,685.00
2 Cat dinding, acrylic emulsi m2 10.93 40,600.00 443,636.20
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 7.31 127,000.00 928,446.20
2 List Plafond m1 15.61 26,900.00 419,909.00
3 Cat plafond, acrylic emulsi m2 7.31 40,400.00 295,348.24
Pekerjaan Pintu dan jendela -
1 Jendela type J3 unit 1.00 329,700.00 329,700.00
2 Pintu type P3 unit 1.00 2,807,100.00 2,807,100.00
Sub jumlah 2.A.2.14 12,574,845.01
15 KM/WC, shower (as 2-4/c-d)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 8.82 166,800.00 1,471,176.00
2 Waterproofing coating m2 8.82 133,700.00 1,179,234.00
3 Urugan pasir t=3cm m3 0.26 265,300.00 70,198.38
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 57.68 217,300.00 12,533,864.00
1 Cat dinding, acrylic emulsi m2 24.50 40,600.00 994,700.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 8.82 127,000.00 1,120,140.00
2 List Plafond m1 35.00 26,900.00 941,500.00
3 Cat plafond, acrylic emulsi m2 8.82 40,400.00 356,328.00

EE GD. ASM PUTRI Page 68


HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

Sanitary -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 6.00 1,393,300.00 8,359,800.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 6.00 312,800.00 1,876,800.00
3 Shower TOTO TX 492 SG bh 2.00 954,800.00 1,909,600.00
4 Tempat sabun ex. Toto S161 bh 2.00 96,900.00 193,800.00
5 Floor Drain ex. Toto type TX1BN bh 8.00 432,400.00 3,459,200.00
6 Tempat tisue ex. Toto AW360 J bh 6.00 538,100.00 3,228,600.00
7 Gantungan baju ex. Toto type TX704ACW bh 8.00 359,700.00 2,877,600.00
Pekerjaan Pintu dan jendela -
1 Jendela type J3 unit 2.00 329,700.00 659,400.00
2 Pintu type P5 unit 8.00 2,115,200.00 16,921,600.00
Sub jumlah 2.A.2.15 58,153,540.38
16 Selasar KM/WC, Shower (as 2-4/c-d)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 9.77 166,800.00 1,629,636.00
2 Waterproofing coating m2 9.77 133,700.00 1,306,249.00
3 Urugan pasir t=3cm m3 0.29 265,300.00 77,759.43
Pekerjaan Dinding -
1 Cat dinding, acrylic emulsi m2 23.63 40,600.00 959,175.00
Pekerjaan Plafond -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 9.77 127,000.00 1,240,790.00
2 List Plafond m1 14.35 26,900.00 386,015.00
3 Cat plafond, acrylic emulsi m2 9.77 40,400.00 394,708.00
Sanitary -
1 Wastafel ex. Toto type LW 640 + kran TX 115 LESN bh 1.00 2,402,400.00 2,402,400.00
2 Meja wastafel rangka baja fin. Granit m1 1.08 822,100.00 883,757.50
3 Kaca cermin t= 6 mm, multiplek 9 mm,List stainless steel m2 1.61 350,000.00 564,375.00
Pekerjaan Pintu dan jendela -
1 Jendela type J3 unit 1.00 329,700.00 329,700.00
2 Pintu type P3 unit 1.00 2,807,100.00 2,807,100.00
Sub jumlah 2.A.2.16 12,981,664.93
17 Janitor (as 2-4/c-d)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 1.54 343,700.00 529,298.00
2 Plint homogeneous tile 10 x 60 cm m1 4.20 41,000.00 172,200.00
3 Urugan pasir t=3cm m3 0.05 265,300.00 12,256.86
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 11.88 40,600.00 482,328.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 1.54 100,900.00 155,386.00
2 List Plafond m1 5.10 26,900.00 137,190.00
3 Cat plafond, acrylic emulsi m2 1.54 40,400.00 62,216.00
Pekerjaan Pintu dan jendela -
1 Pintu type P4 unit 1.00 2,258,200.00 2,258,200.00
Sub jumlah 2.A.2.17 3,809,074.86
18 R. Tidur Asrama (as 3-7/c-d)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 68.93 343,700.00 23,691,241.00
2 Plint homogeneous tile 10 x 60 cm m1 35.50 41,000.00 1,455,500.00
3 Urugan pasir t=3cm m3 2.07 265,300.00 548,613.87
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 80.24 40,600.00 3,257,541.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 68.93 100,900.00 6,955,037.00
2 List Plafond m1 39.10 26,900.00 1,051,790.00
3 Cat plafond, acrylic emulsi m2 68.93 40,400.00 2,784,772.00
Pekerjaan Pintu dan jendela -
1 Jendela type J1 unit 6.00 4,098,200.00 24,589,200.00
2 Pintu type P2 unit 2.00 4,872,300.00 9,744,600.00
Sub jumlah 2.A.2.18 74,078,294.87
19 R. Tidur Asrama (as 6-10/c-d)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 68.93 343,700.00 23,691,241.00
2 Plint homogeneous tile 10 x 60 cm m1 35.50 41,000.00 1,455,500.00
3 Urugan pasir t=3cm m3 2.07 265,300.00 548,613.87
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 80.24 40,600.00 3,257,541.00
Pekerjaan Plafond - -

EE GD. ASM PUTRI Page 69


HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

1 Plafond gypsum 9 mm, rangka metal furing m2 68.93 100,900.00 6,955,037.00


2 List Plafond m1 39.10 26,900.00 1,051,790.00
3 Cat plafond, acrylic emulsi m2 68.93 40,400.00 2,784,772.00
Pekerjaan Pintu dan jendela -
1 Jendela type J1 unit 6.00 4,098,200.00 24,589,200.00
2 Pintu type P2 unit 2.00 4,872,300.00 9,744,600.00
Sub jumlah 2.A.2.19 74,078,294.87
20 KM/WC, shower (as 9-11/c-d)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 8.82 166,800.00 1,471,176.00
2 Waterproofing coating m2 8.82 133,700.00 1,179,234.00
3 Urugan pasir t=3cm m3 0.26 265,300.00 70,198.38
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 57.68 217,300.00 12,533,864.00
1 Cat dinding, acrylic emulsi m2 24.50 40,600.00 994,700.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 8.82 127,000.00 1,120,140.00
2 List Plafond m1 35.00 26,900.00 941,500.00
3 Cat plafond, acrylic emulsi m2 8.82 40,400.00 356,328.00
Sanitary - -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 6.00 1,393,300.00 8,359,800.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 6.00 312,800.00 1,876,800.00
3 Shower TOTO TX 492 SG bh 2.00 954,800.00 1,909,600.00
4 Tempat sabun ex. Toto S161 bh 2.00 96,900.00 193,800.00
5 Floor Drain ex. Toto type TX1BN bh 8.00 432,400.00 3,459,200.00
6 Tempat tisue ex. Toto AW360 J bh 6.00 538,100.00 3,228,600.00
7 Gantungan baju ex. Toto type TX704ACW bh 8.00 359,700.00 2,877,600.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J3 unit 2.00 329,700.00 659,400.00
2 Pintu type P5 unit 8.00 2,115,200.00 16,921,600.00
Sub jumlah 2.A.2.20 58,153,540.38
21 Selasar KM/WC, Shower (as 9-10/c-d)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 9.77 166,800.00 1,629,636.00
2 Waterproofing coating m2 9.77 133,700.00 1,306,249.00
3 Urugan pasir t=3cm m3 0.29 265,300.00 77,759.43
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 23.63 40,600.00 959,175.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 9.77 127,000.00 1,240,790.00
2 List Plafond m1 14.35 26,900.00 386,015.00
3 Cat plafond, acrylic emulsi m2 9.77 40,400.00 394,708.00
Sanitary - -
1 Wastafel ex. Toto type LW 640 + kran TX 115 LESN bh 1.00 2,402,400.00 2,402,400.00
2 Meja wastafel rangka baja fin. Granit m1 1.08 822,100.00 883,757.50
3 Kaca cermin t= 6 mm, multiplek 9 mm,List stainless steel m2 1.61 350,000.00 564,375.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J3 unit 1.00 329,700.00 329,700.00
2 Pintu type P3 unit 1.00 2,807,100.00 2,807,100.00
Sub jumlah 2.A.2.21 12,981,664.93
22 Janitor (as 6-10/c-d)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 1.54 343,700.00 529,298.00
2 Plint homogeneous tile 10 x 60 cm m1 4.20 41,000.00 172,200.00
3 Urugan pasir t=3cm m3 0.05 265,300.00 12,256.86
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 11.88 40,600.00 482,328.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 1.54 100,900.00 155,386.00
2 List Plafond m1 5.10 26,900.00 137,190.00
3 Cat plafond, acrylic emulsi m2 1.54 40,400.00 62,216.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P4 unit 1.00 2,258,200.00 2,258,200.00
Sub jumlah 2.A.2.22 3,809,074.86
23 Area Tangga (as 1-2/a-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished area lantai dasar m2 22.16 343,700.00 7,616,392.00
2 Pasangan lantai homogeneous tile uk. 30 x 30 cm polished (bordes+anak tangga) m2 24.31 378,900.00 9,212,517.77

EE GD. ASM PUTRI Page 70


HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

3 Pasangan lantai keramik step nozing 10 x 30 m1 41.73 65,700.00 2,741,332.50


4 Urugan pasir t=3cm m3 0.66 265,300.00 176,371.44
Pekerjaan Dinding -
1 Cat dinding, acrylic emulsi m2 60.86 40,600.00 2,471,078.40
2 Plint homogeneous tile 10 x 60 cm m1 32.32 41,000.00 1,325,120.00
Pekerjaan Plafond -
1 Plafond gypsum 9 mm, rangka metal furing m2 22.16 100,900.00 2,235,944.00
2 List Plafond m1 20.10 26,900.00 540,690.00
3 Cat plafond, acrylic emulsi m2 39.24 40,400.00 1,585,296.00
Railling -
1 Pekerjaan railing pipa BSP kombinasi besi tempa fin. Cat Duco m1 8.34 755,000.00 6,293,680.00
2 Pekerjaan hand railing pipa BSP fin. Cat Duco m1 8.03 465,500.00 3,739,827.00
Sub jumlah 2.A.2.23 37,938,249.11
24 Area Tangga (as 11-12/a-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished area lantai dasar m2 22.16 343,700.00 7,616,392.00
2 Pasangan lantai homogeneous tile uk. 30 x 30 cm polished (bordes+anak tangga) m2 24.31 378,900.00 9,212,517.77
3 Pasangan lantai keramik step nozing 10 x 30 m1 41.73 65,700.00 2,741,332.50
4 Urugan pasir t=3cm m3 0.66 265,300.00 176,371.44
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 60.86 40,600.00 2,471,078.40
2 Plint homogeneous tile 10 x 60 cm m1 32.32 41,000.00 1,325,120.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 22.16 100,900.00 2,235,944.00
2 List Plafond m1 20.10 26,900.00 540,690.00
3 Cat plafond, acrylic emulsi m2 39.24 40,400.00 1,585,296.00
Railling - -
1 Pekerjaan railing pipa BSP kombinasi besi tempa fin. Cat Duco m1 8.34 755,000.00 6,293,680.00
2 Pekerjaan hand railing pipa BSP fin. Cat Duco m1 8.03 465,500.00 3,739,827.00
Sub jumlah 2.A.2.24 37,938,249.11
Jumlah 2.A.2 760,345,912.05
Jumlah 2.A 1,090,780,346.79
B FINISHING EXTERIOR
1 Cat dinding, kolom, balok struktur luar weathershield, acrylic emulsi m2 274.41 40,200.00 11,031,402.60
Sub jumlah 2.B.1 11,031,402.60
Jumlah 2.B 11,031,402.60

EE GD. ASM PUTRI Page 71


REKAPITULASI
ENGINEERING ESTIMATE
(EE)
Pekerjaan : Pembangunan Politeknik KP Pangandaran
Lokasi : Pangandaran - Jawa Barat
Thn Anggaran : 2018

JUMLAH HARGA
NO. JENIS PEKERJAAN (Rp.)

GEDUNG FLAT DOSEN


ARSITEKTUR
I LANTAI DASAR
A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding 170,237,161.84
2 Pekerjaan Finishing 629,248,786.14
B FINISHING EXTERIOR 8,891,838.00

II PEKERJAAN LANTAI 1
A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding 361,423,188.49
2 Pekerjaan Finishing 1,249,000,666.81
B FINISHING EXTERIOR 8,891,838.00

III PEKERJAAN LANTAI 2


A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding 361,423,188.49
2 Pekerjaan Finishing 1,248,976,456.81
B FINISHING EXTERIOR 8,891,838.00

IV LANTAI DAK ATAP


A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding 60,184,217.35
2 Pekerjaan Finishing 300,126,981.10
B FINISHING EXTERIOR 21,917,616.00

JUMLAH 4,429,213,777.03
ENGINEERING ESTIMATE

(EE)

Pekerjaan : Pembangunan Politeknik KP Pangandaran


Lokasi : Pangandaran - Jawa Barat
Thn Anggaran : 2018

HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

GEDUNG FLAT DOSEN


I LANTAI DASAR
A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding
1 Pasangan dinding bata merah ukuran tebal ½ bata, campuran spesi 1 Pc : 4 Ps m2 329.29 112,900.00 37,176,276.50
2 Pek. Plesteran m2 658.57 46,100.00 30,360,077.00
3 Pek. Acian m2 658.57 20,900.00 13,764,113.00
4 Pek. Rooster beton m2 266.50 303,500.00 80,882,750.00
5 Plesteran + acian kolom, balok, dinding, lisplank beton struktur m2 62.21 67,000.00 4,167,936.00
6 Kolom praktis + ring balok ukuran 12 x 12 Cm m3 0.41 9,370,200.00 3,886,009.34
Sub Jumlah 1.A.1 170,237,161.84
2 Pekerjaan Finishing
1 Lantai dasar dan common space (as 1-6/a-f)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 272.10 343,700.00 93,520,770.00
2 Plint homogeneous tile 10 x 60 cm m1 111.70 41,000.00 4,579,700.00
3 Urugan pasir t=3cm m3 8.16 265,300.00 2,165,643.90
Pekerjaan Dinding -
1 Cat dinding dan Kolom, acrylic emulsi m2 541.11 40,600.00 21,968,863.00
Pekerjaan Plafond -
1 Plafond gypsum 9 mm, rangka metal furing m2 272.10 100,900.00 27,454,890.00
2 List Plafond m1 111.70 26,900.00 3,004,730.00
3 Cat plafond, acrylic emulsi m2 272.10 40,400.00 10,992,840.00
Sub Jumlah 1.A.2.1 163,687,436.90
2 Mushola (as 1-3/a-f)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 274.20 343,700.00 94,242,540.00
2 Plint homogeneous tile 10 x 60 cm m1 69.70 41,000.00 2,857,700.00
3 Urugan pasir t=3cm m3 8.23 265,300.00 2,182,357.80
Pekerjaan Dinding -
1 Cat dinding, acrylic emulsi m2 164.85 40,600.00 6,692,707.00
2 Pek. Pasangan dinding keramik 30 x 30 cm t=60cm m2 43.53 157,400.00 6,851,622.00
Pekerjaan Plafond -
1 Plafond gypsum 9 mm, rangka metal furing m2 274.20 100,900.00 27,666,780.00
2 List Plafond m1 69.70 26,900.00 1,874,930.00
3 Cat plafond, acrylic emulsi m2 274.20 40,400.00 11,077,680.00
Sub Jumlah 1.A.2.2 153,446,316.80
3 Koperasi mahasiswa (as 4-5/d-f)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 60.00 343,700.00 20,622,000.00
2 Plint homogeneous tile 10 x 60 cm m1 32.00 41,000.00 1,312,000.00
3 Urugan pasir t=3cm m3 1.80 265,300.00 477,540.00
Pekerjaan Dinding -
1 Cat dinding, acrylic emulsi m2 91.51 40,600.00 3,715,103.00
Pekerjaan Plafond -
1 Plafond gypsum 9 mm, rangka metal furing m2 60.00 100,900.00 6,054,000.00
2 List Plafond m1 32.00 26,900.00 860,800.00
3 Cat plafond, acrylic emulsi m2 60.00 40,400.00 2,424,000.00
Pekerjaan Pintu dan jendela -
1 Pintu type P9 unit 1.00 13,820,100.00 13,820,100.00
Sub Jumlah 1.A.2.3 49,285,543.00
4 R. Konseling (as 5-6/e-f)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 20.00 343,700.00 6,874,000.00
2 Plint homogeneous tile 10 x 60 cm m1 14.00 41,000.00 574,000.00
3 Urugan pasir t=3cm m3 0.60 265,300.00 159,180.00
Pekerjaan Dinding -
1 Cat dinding, acrylic emulsi m2 45.48 40,600.00 1,846,488.00
Pekerjaan Plafond -
1 Plafond gypsum 9 mm, rangka metal furing m2 20.00 100,900.00 2,018,000.00
2 List Plafond m1 14.00 26,900.00 376,600.00

EE GD. FLAT DOSEN Page 73


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

3 Cat plafond, acrylic emulsi m2 20.00 40,400.00 808,000.00


Pekerjaan Pintu dan jendela - -
1 Pintu type P5 unit 1.00 2,803,300.00 2,803,300.00
Sub Jumlah 1.A.2.4 15,459,568.00
5 R. Pemulihan (as 5-6/d-f)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 18.00 343,700.00 6,186,600.00
2 Plint homogeneous tile 10 x 60 cm m1 17.10 41,000.00 701,100.00
3 Urugan pasir t=3cm m3 0.54 265,300.00 143,262.00
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 57.88 40,600.00 2,349,928.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 18.00 100,900.00 1,816,200.00
2 List Plafond m1 18.00 26,900.00 484,200.00
3 Cat plafond, acrylic emulsi m2 18.00 40,400.00 727,200.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P5 unit 1.00 2,803,300.00 2,803,300.00
Sub Jumlah 1.A.2.5 15,211,790.00
6 Gudang Alat (as 5-6/d-e)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 6.00 343,700.00 2,062,200.00
2 Plint homogeneous tile 10 x 60 cm m1 9.10 41,000.00 373,100.00
3 Urugan pasir t=3cm m3 0.18 265,300.00 47,754.00
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 34.28 40,600.00 1,391,605.60
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 6.00 100,900.00 605,400.00
2 List Plafond m1 10.00 26,900.00 269,000.00
3 Cat plafond, acrylic emulsi m2 6.00 40,400.00 242,400.00
Pekerjaan Pintu dan jendela -
1 Pintu type P6 unit 1.00 4,071,100.00 4,071,100.00
Sub Jumlah 1.A.2.6 9,062,559.60
7 Janitor (as 5-6/d-e)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 6.00 343,700.00 2,062,200.00
2 Plint homogeneous tile 10 x 60 cm m1 9.10 41,000.00 373,100.00
3 Urugan pasir t=3cm m3 0.18 265,300.00 47,754.00
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 32.76 40,600.00 1,330,056.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 6.00 100,900.00 605,400.00
2 List Plafond m1 10.00 26,900.00 269,000.00
3 Cat plafond, acrylic emulsi m2 6.00 40,400.00 242,400.00
Pekerjaan Pintu dan jendela
1 Pintu type P7 unit 1.00 2,648,700.00 2,648,700.00
Sub Jumlah 1.A.2.7 7,578,610.00
8 Area Tangga (as 3-4/a-b)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile uk. 30 x 30 cm polished (bordes+anak tangga) m2 37.10 378,900.00 14,057,190.00
2 Pasangan lantai keramik step nozing 10 x 30 m1 62.20 65,700.00 4,086,540.00
Pekerjaan Dinding -
1 Plint homogeneous tile 10 x 30 cm m1 46.10 41,900.00 1,931,590.00
Pekerjaan Plafond -
1 Cat plafond+tangga, acrylic emulsi m2 30.00 40,600.00 1,218,000.00
Railling -
1 Pekerjaan railing pipa BSP kombinasi besi tempa fin. Cat Duco m1 21.56 755,000.00 16,277,800.00
2 Pekerjaan hand railing pipa BSP fin. Cat Duco m1 16.56 465,500.00 7,708,680.00
Sub Jumlah 1.A.2.8 45,279,800.00
Jumlah 1.A.2 459,011,624.30
Jumlah 1.A 629,248,786.14
B FINISHING EXTERIOR
1 Cat dinding, kolom, balok struktur luar weathershield, acrylic emulsi m2 221.19 40,200.00 8,891,838.00
Sub jumlah 1.B.1 8,891,838.00
Jumlah 1.B 8,891,838.00
II PEKERJAAN LANTAI 1
A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding
1 Pasangan dinding bata merah ukuran tebal ½ bata, campuran spesi 1 Pc : 4 Ps m2 1,197.10 112,900.00 135,152,985.15

EE GD. FLAT DOSEN Page 74


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

2 Pek. Plesteran m2 2,394.21 46,100.00 110,372,942.70


3 Pek. Acian m1 2,394.21 20,900.00 50,038,926.30
4 Plesteran + acian kolom, balok, dinding, lisplank beton struktur m2 62.21 67,000.00 4,167,936.00
5 Kolom praktis + ring balok ukuran 12 x 12 Cm m3 6.58 9,370,200.00 61,690,398.34
Sub Jumlah 2.A.1 361,423,188.49
2 Pekerjaan Finishing
1 Koridor (as 1-6/b-e)
Pekerjaan Lantai
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 137.13 343,700.00 47,131,581.00
2 Plint homogeneous tile 10 x 60 cm m1 86.20 41,000.00 3,534,200.00
3 Urugan pasir t=3cm m3 4.11 265,300.00 1,091,417.67
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 362.68 40,600.00 14,724,808.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 137.13 100,900.00 13,836,417.00
2 List Plafond m1 101.20 26,900.00 2,722,280.00
3 Cat plafond, acrylic emulsi m2 137.13 40,400.00 5,540,052.00
Pekerjaan Pintu dan jendela -
1 Jendela type J4 unit 2.00 8,810,200.00 17,620,400.00
Sub jumlah 2.A.2.1 106,201,155.67
2 R. Keluarga dan R. Makan (as 1-2/a-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 30.29 343,700.00 10,410,673.00
2 Plint homogeneous tile 10 x 60 cm m1 20.77 41,000.00 851,570.00
3 Urugan pasir t=3cm m3 0.91 265,300.00 241,078.11
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 107.95 40,600.00 4,382,952.70
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 30.29 100,900.00 3,056,261.00
2 List Plafond m1 29.77 26,900.00 800,813.00
3 Cat plafond, acrylic emulsi m2 30.29 40,400.00 1,223,716.00
Saniter -
1 Pek. Meja beton lapis keramik 30 x 30 cm m2 1.25 624,800.00 781,000.00
2 Kitchen sink unit 1.00 1,002,600.00 1,002,600.00
3 Kran Ex. Toto type. TX609 bh 1.00 284,000.00 284,000.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
1 Jendela type J3 unit 1.00 2,807,200.00 2,807,200.00
2 Pintu type P1 unit 1.00 2,818,000.00 2,818,000.00
2 Pintu type P4 unit 1.00 2,818,000.00 2,818,000.00
Sub jumlah 2.A.2.2 35,576,063.81
3 Balkon (as 1-2/a-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 3.61 343,700.00 1,240,757.00
2 Plint homogeneous tile 10 x 60 cm m1 7.60 41,000.00 311,600.00
3 Urugan pasir t=3cm m3 0.11 265,300.00 28,731.99
Pekerjaan Dinding -
1 Cat dinding, acrylic emulsi m2 31.29 40,600.00 1,270,475.50
Pekerjaan Plafond -
1 Plafond gypsum 9 mm, rangka metal furing m2 3.61 100,900.00 364,249.00
2 List Plafond m1 8.50 26,900.00 228,650.00
3 Cat plafond, acrylic emulsi m2 3.61 40,400.00 145,844.00
Perlengkapan
1 Railing balkon m1 3.00 650,000.00 1,950,000.00
Sub jumlah 2.A.2.3 5,540,307.49
4 R. Tidur (as 1-2/a-b)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 9.66 343,700.00 3,320,142.00
2 Plint homogeneous tile 10 x 60 cm m1 12.49 41,000.00 512,090.00
3 Urugan pasir t=3cm m3 0.29 265,300.00 76,883.94
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 46.45 40,600.00 1,885,930.90
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 9.66 100,900.00 974,694.00
2 List Plafond m1 13.39 26,900.00 360,191.00
3 Cat plafond, acrylic emulsi m2 9.66 40,400.00 390,264.00
Pekerjaan Pintu dan jendela - -

EE GD. FLAT DOSEN Page 75


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00


2 Pintu type P2 unit 1.00 2,833,300.00 2,833,300.00
Sub jumlah 2.A.2.4 14,451,695.84
5 R. Tidur (as 1-2/b-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 8.69 343,700.00 2,986,753.00
2 Plint homogeneous tile 10 x 60 cm m1 11.10 41,000.00 455,100.00
3 Urugan pasir t=3cm m3 0.26 265,300.00 69,163.71
Pekerjaan Dinding -
1 Cat dinding, acrylic emulsi m2 43.43 40,600.00 1,763,258.00
Pekerjaan Plafond -
1 Plafond gypsum 9 mm, rangka metal furing m2 8.69 100,900.00 876,821.00
2 List Plafond m1 12.00 26,900.00 322,800.00
3 Cat plafond, acrylic emulsi m2 8.69 40,400.00 351,076.00
Pekerjaan Pintu dan jendela -
1 Jendela type J2 unit 1.00 4,099,200.00 4,099,200.00
2 Pintu type P2 unit 1.00 2,833,300.00 2,833,300.00
Sub jumlah 2.A.2.5 13,757,471.71
6 KM/WC (as 1-2/a-c)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 2.00 166,800.00 333,600.00
2 Waterproofing coating m2 2.00 133,700.00 267,400.00
3 Urugan pasir t=3cm m3 0.06 265,300.00 15,918.00
Pekerjaan Dinding -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 11.46 217,300.00 2,490,258.00
2 Cat dinding, acrylic emulsi m2 4.55 40,600.00 184,730.00
Pekerjaan Plafond -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 2.00 127,000.00 254,000.00
2 List Plafond m1 6.50 26,900.00 174,850.00
3 Cat plafond, acrylic emulsi m2 2.00 40,400.00 80,800.00
Sanitary -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 1.00 1,393,300.00 1,393,300.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 1.00 312,800.00 312,800.00
3 Floor Drain ex. Toto type TX1BN bh 1.00 432,400.00 432,400.00
4 Tempat tisue ex. Toto AW360 J bh 1.00 538,100.00 538,100.00
5 Tempat sabun ex. Toto S161 bh 1.00 96,900.00 96,900.00
6 Gantungan baju ex. Toto type TX704ACW bh 1.00 359,700.00 359,700.00
7 Bak Mandi fiber lapis keramik unit 1.00 2,003,300.00 2,003,300.00
Pekerjaan Pintu dan jendela -
1 Pintu type P3 unit 1.00 2,122,700.00 2,122,700.00
Sub jumlah 2.A.2.6 11,060,756.00
7 R. Keluarga dan R. Makan (as 2-3/a-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 30.29 343,700.00 10,410,673.00
2 Plint homogeneous tile 10 x 60 cm m1 20.77 41,000.00 851,570.00
3 Urugan pasir t=3cm m3 0.91 265,300.00 241,078.11
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 107.95 40,600.00 4,382,952.70
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 30.29 100,900.00 3,056,261.00
2 List Plafond m1 29.77 26,900.00 800,813.00
3 Cat plafond, acrylic emulsi m2 30.29 40,400.00 1,223,716.00
Saniter - -
1 Pek. Meja beton lapis keramik 30 x 30 cm m2 1.25 624,800.00 781,000.00
2 Kitchen sink unit 1.00 1,002,600.00 1,002,600.00
3 Kran Ex. Toto type. TX609 bh 1.00 284,000.00 284,000.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
1 Jendela type J3 unit 1.00 2,807,200.00 2,807,200.00
2 Pintu type P1 unit 1.00 2,818,000.00 2,818,000.00
2 Pintu type P4 unit 1.00 2,818,000.00 2,818,000.00
Sub jumlah 2.A.2.7 35,576,063.81
8 Balkon (as 2-3/a-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 3.61 343,700.00 1,240,757.00
2 Plint homogeneous tile 10 x 60 cm m1 7.60 41,000.00 311,600.00
3 Urugan pasir t=3cm m3 0.11 265,300.00 28,731.99
Pekerjaan Dinding - -

EE GD. FLAT DOSEN Page 76


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

1 Cat dinding, acrylic emulsi m2 31.29 40,600.00 1,270,475.50


Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 3.61 100,900.00 364,249.00
2 List Plafond m1 8.50 26,900.00 228,650.00
3 Cat plafond, acrylic emulsi m2 3.61 40,400.00 145,844.00
Perlengkapan -
1 Railing balkon m1 3.00 650,000.00 1,950,000.00
Sub jumlah 2.A.2.8 5,540,307.49
9 R. Tidur (as 2-3/a-b)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 9.66 343,700.00 3,320,142.00
2 Plint homogeneous tile 10 x 60 cm m1 12.49 41,000.00 512,090.00
3 Urugan pasir t=3cm m3 0.29 265,300.00 76,883.94
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 46.45 40,600.00 1,885,930.90
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 9.66 100,900.00 974,694.00
2 List Plafond m1 13.39 26,900.00 360,191.00
3 Cat plafond, acrylic emulsi m2 9.66 40,400.00 390,264.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
2 Pintu type P2 unit 1.00 2,833,300.00 2,833,300.00
Sub jumlah 2.A.2.9 14,451,695.84
10 R. Tidur (as 2-3/b-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 8.69 343,700.00 2,986,753.00
2 Plint homogeneous tile 10 x 60 cm m1 11.10 41,000.00 455,100.00
3 Urugan pasir t=3cm m3 0.26 265,300.00 69,163.71
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 43.43 40,600.00 1,763,258.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 8.69 100,900.00 876,821.00
2 List Plafond m1 12.00 26,900.00 322,800.00
3 Cat plafond, acrylic emulsi m2 8.69 40,400.00 351,076.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J2 unit 1.00 4,099,200.00 4,099,200.00
2 Pintu type P2 unit 1.00 2,833,300.00 2,833,300.00
Sub jumlah 2.A.2.10 13,757,471.71
11 KM/WC (as 2-3/a-c)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 2.00 166,800.00 333,600.00
2 Waterproofing coating m2 2.00 133,700.00 267,400.00
3 Urugan pasir t=3cm m3 0.06 265,300.00 15,918.00
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 11.46 217,300.00 2,490,258.00
2 Cat dinding, acrylic emulsi m2 4.55 40,600.00 184,730.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 2.00 127,000.00 254,000.00
2 List Plafond m1 6.50 26,900.00 174,850.00
3 Cat plafond, acrylic emulsi m2 2.00 40,400.00 80,800.00
Sanitary - -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 1.00 1,393,300.00 1,393,300.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 1.00 312,800.00 312,800.00
3 Floor Drain ex. Toto type TX1BN bh 1.00 432,400.00 432,400.00
4 Tempat tisue ex. Toto AW360 J bh 1.00 538,100.00 538,100.00
5 Tempat sabun ex. Toto S161 bh 1.00 96,900.00 96,900.00
6 Gantungan baju ex. Toto type TX704ACW bh 1.00 359,700.00 359,700.00
7 Bak Mandi fiber lapis keramik unit 1.00 2,003,300.00 2,003,300.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P3 unit 1.00 2,122,700.00 2,122,700.00
Sub jumlah 2.A.2.11 11,060,756.00
12 R. Keluarga dan R. Makan (as 4-5/a-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 30.29 343,700.00 10,410,673.00
2 Plint homogeneous tile 10 x 60 cm m1 20.77 41,000.00 851,570.00
3 Urugan pasir t=3cm m3 0.91 265,300.00 241,078.11
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 107.95 40,600.00 4,382,952.70

EE GD. FLAT DOSEN Page 77


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 30.29 100,900.00 3,056,261.00
2 List Plafond m1 29.77 26,900.00 800,813.00
3 Cat plafond, acrylic emulsi m2 30.29 40,400.00 1,223,716.00
Saniter - -
1 Pek. Meja beton lapis keramik 30 x 30 cm m2 1.25 624,800.00 781,000.00
2 Kitchen sink unit 1.00 1,002,600.00 1,002,600.00
3 Kran Ex. Toto type. TX609 bh 1.00 284,000.00 284,000.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
1 Jendela type J3 unit 1.00 2,807,200.00 2,807,200.00
2 Pintu type P1 unit 1.00 2,818,000.00 2,818,000.00
2 Pintu type P4 unit 1.00 2,818,000.00 2,818,000.00
Sub jumlah 2.A.2.12 35,576,063.81
13 Balkon (as 4-5/a-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 3.61 343,700.00 1,240,757.00
2 Plint homogeneous tile 10 x 60 cm m1 7.60 41,000.00 311,600.00
3 Urugan pasir t=3cm m3 0.11 265,300.00 28,731.99
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 31.29 40,600.00 1,270,475.50
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 3.61 100,900.00 364,249.00
2 List Plafond m1 8.50 26,900.00 228,650.00
3 Cat plafond, acrylic emulsi m2 3.61 40,400.00 145,844.00
Perlengkapan -
1 Railing balkon m1 3.00 650,000.00 1,950,000.00
Sub jumlah 2.A.2.13 5,540,307.49
14 R. Tidur (as 4-5/a-b)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 9.66 343,700.00 3,320,142.00
2 Plint homogeneous tile 10 x 60 cm m1 12.49 41,000.00 512,090.00
3 Urugan pasir t=3cm m3 0.29 265,300.00 76,883.94
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 46.45 40,600.00 1,885,930.90
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 9.66 100,900.00 974,694.00
2 List Plafond m1 13.39 26,900.00 360,191.00
3 Cat plafond, acrylic emulsi m2 9.66 40,400.00 390,264.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
2 Pintu type P2 unit 1.00 2,833,300.00 2,833,300.00
Sub jumlah 2.A.2.14 14,451,695.84
15 R. Tidur (as 4-5/b-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 8.69 343,700.00 2,986,753.00
2 Plint homogeneous tile 10 x 60 cm m1 11.10 41,000.00 455,100.00
3 Urugan pasir t=3cm m3 0.26 265,300.00 69,163.71
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 43.43 40,600.00 1,763,258.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 8.69 100,900.00 876,821.00
2 List Plafond m1 12.00 26,900.00 322,800.00
3 Cat plafond, acrylic emulsi m2 8.69 40,400.00 351,076.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J2 unit 1.00 4,099,200.00 4,099,200.00
2 Pintu type P2 unit 1.00 2,833,300.00 2,833,300.00
Sub jumlah 2.A.2.15 13,757,471.71
16 KM/WC (as 4-5/a-c)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 2.00 166,800.00 333,600.00
2 Waterproofing coating m2 2.00 133,700.00 267,400.00
3 Urugan pasir t=3cm m3 0.06 265,300.00 15,918.00
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 11.46 217,300.00 2,490,258.00
2 Cat dinding, acrylic emulsi m2 4.55 40,600.00 184,730.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 2.00 127,000.00 254,000.00

EE GD. FLAT DOSEN Page 78


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

2 List Plafond m1 6.50 26,900.00 174,850.00


3 Cat plafond, acrylic emulsi m2 2.00 40,400.00 80,800.00
Sanitary - -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 1.00 1,393,300.00 1,393,300.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 1.00 312,800.00 312,800.00
3 Floor Drain ex. Toto type TX1BN bh 1.00 432,400.00 432,400.00
4 Tempat tisue ex. Toto AW360 J bh 1.00 538,100.00 538,100.00
5 Tempat sabun ex. Toto S161 bh 1.00 96,900.00 96,900.00
6 Gantungan baju ex. Toto type TX704ACW bh 1.00 359,700.00 359,700.00
7 Bak Mandi fiber lapis keramik unit 1.00 2,003,300.00 2,003,300.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P3 unit 1.00 2,122,700.00 2,122,700.00
Sub jumlah 2.A.2.16 11,060,756.00
17 R. Keluarga dan R. Makan (as 5-6/a-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 30.29 343,700.00 10,410,673.00
2 Plint homogeneous tile 10 x 60 cm m1 20.77 41,000.00 851,570.00
3 Urugan pasir t=3cm m3 0.91 265,300.00 241,078.11
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 107.95 40,600.00 4,382,952.70
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 30.29 100,900.00 3,056,261.00
2 List Plafond m1 29.77 26,900.00 800,813.00
3 Cat plafond, acrylic emulsi m2 30.29 40,400.00 1,223,716.00
Saniter - -
1 Pek. Meja beton lapis keramik 30 x 30 cm m2 1.25 624,800.00 781,000.00
2 Kitchen sink unit 1.00 1,002,600.00 1,002,600.00
3 Kran Ex. Toto type. TX609 bh 1.00 284,000.00 284,000.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
1 Jendela type J3 unit 1.00 2,807,200.00 2,807,200.00
2 Pintu type P1 unit 1.00 2,818,000.00 2,818,000.00
2 Pintu type P4 unit 1.00 2,818,000.00 2,818,000.00
Sub jumlah 2.A.2.17 35,576,063.81
18 Balkon (as 5-6/a-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 3.61 343,700.00 1,240,757.00
2 Plint homogeneous tile 10 x 60 cm m1 7.60 41,000.00 311,600.00
3 Urugan pasir t=3cm m3 0.11 265,300.00 28,731.99
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 31.29 40,600.00 1,270,475.50
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 3.61 100,900.00 364,249.00
2 List Plafond m1 8.50 26,900.00 228,650.00
3 Cat plafond, acrylic emulsi m2 3.61 40,400.00 145,844.00
Perlengkapan -
1 Railing balkon m1 3.00 650,000.00 1,950,000.00
Sub jumlah 2.A.2.18 5,540,307.49
19 R. Tidur (as 5-6/a-b)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 9.66 343,700.00 3,320,142.00
2 Plint homogeneous tile 10 x 60 cm m1 12.49 41,000.00 512,090.00
3 Urugan pasir t=3cm m3 0.29 265,300.00 76,883.94
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 46.45 40,600.00 1,885,930.90
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 9.66 100,900.00 974,694.00
2 List Plafond m1 13.39 26,900.00 360,191.00
3 Cat plafond, acrylic emulsi m2 9.66 40,400.00 390,264.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
2 Pintu type P2 unit 1.00 2,833,300.00 2,833,300.00
Sub jumlah 2.A.2.19 14,451,695.84
20 R. Tidur (as 5-6/b-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 8.69 343,700.00 2,986,753.00
2 Plint homogeneous tile 10 x 60 cm m1 11.10 41,000.00 455,100.00
3 Urugan pasir t=3cm m3 0.26 265,300.00 69,163.71

EE GD. FLAT DOSEN Page 79


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 43.43 40,600.00 1,763,258.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 8.69 100,900.00 876,821.00
2 List Plafond m1 12.00 26,900.00 322,800.00
3 Cat plafond, acrylic emulsi m2 8.69 40,400.00 351,076.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J2 unit 1.00 4,099,200.00 4,099,200.00
2 Pintu type P2 unit 1.00 2,833,300.00 2,833,300.00
Sub jumlah 2.A.2.20 13,757,471.71
21 KM/WC (as 5-6/a-c)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 2.00 166,800.00 333,600.00
2 Waterproofing coating m2 2.00 133,700.00 267,400.00
3 Urugan pasir t=3cm m3 0.06 265,300.00 15,918.00
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 11.46 217,300.00 2,490,258.00
2 Cat dinding, acrylic emulsi m2 4.55 40,600.00 184,730.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 2.00 127,000.00 254,000.00
2 List Plafond m1 6.50 26,900.00 174,850.00
3 Cat plafond, acrylic emulsi m2 2.00 40,400.00 80,800.00
Sanitary - -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 1.00 1,393,300.00 1,393,300.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 1.00 312,800.00 312,800.00
3 Floor Drain ex. Toto type TX1BN bh 1.00 432,400.00 432,400.00
4 Tempat tisue ex. Toto AW360 J bh 1.00 538,100.00 538,100.00
5 Tempat sabun ex. Toto S161 bh 1.00 96,900.00 96,900.00
6 Gantungan baju ex. Toto type TX704ACW bh 1.00 359,700.00 359,700.00
7 Bak Mandi fiber lapis keramik unit 1.00 2,003,300.00 2,003,300.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P3 unit 1.00 2,122,700.00 2,122,700.00
Sub jumlah 2.A.2.21 11,060,756.00
22 R. Keluarga dan R. Makan (as 1-2/d-f)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 30.29 343,700.00 10,410,673.00
2 Plint homogeneous tile 10 x 60 cm m1 20.77 41,000.00 851,570.00
3 Urugan pasir t=3cm m3 0.91 265,300.00 241,078.11
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 107.95 40,600.00 4,382,952.70
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 30.29 100,900.00 3,056,261.00
2 List Plafond m1 29.77 26,900.00 800,813.00
3 Cat plafond, acrylic emulsi m2 30.29 40,400.00 1,223,716.00
Saniter - -
1 Pek. Meja beton lapis keramik 30 x 30 cm m2 1.25 624,800.00 781,000.00
2 Kitchen sink unit 1.00 1,002,600.00 1,002,600.00
3 Kran Ex. Toto type. TX609 bh 1.00 284,000.00 284,000.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
1 Jendela type J3 unit 1.00 2,807,200.00 2,807,200.00
2 Pintu type P1 unit 1.00 2,818,000.00 2,818,000.00
2 Pintu type P4 unit 1.00 2,818,000.00 2,818,000.00
Sub jumlah 2.A.2.22 35,576,063.81
23 Balkon (as 1-2/d-f)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 3.61 343,700.00 1,240,757.00
2 Plint homogeneous tile 10 x 60 cm m1 7.60 41,000.00 311,600.00
3 Urugan pasir t=3cm m3 0.11 265,300.00 28,731.99
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 31.29 40,600.00 1,270,475.50
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 3.61 100,900.00 364,249.00
2 List Plafond m1 8.50 26,900.00 228,650.00
3 Cat plafond, acrylic emulsi m2 3.61 40,400.00 145,844.00
Perlengkapan -
1 Railing balkon m1 3.00 650,000.00 1,950,000.00
Sub jumlah 2.A.2.23 5,540,307.49

EE GD. FLAT DOSEN Page 80


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

24 R. Tidur (as 1-2/e-f)


Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 9.66 343,700.00 3,320,142.00
2 Plint homogeneous tile 10 x 60 cm m1 12.49 41,000.00 512,090.00
3 Urugan pasir t=3cm m3 0.29 265,300.00 76,883.94
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 46.45 40,600.00 1,885,930.90
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 9.66 100,900.00 974,694.00
2 List Plafond m1 13.39 26,900.00 360,191.00
3 Cat plafond, acrylic emulsi m2 9.66 40,400.00 390,264.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
2 Pintu type P2 unit 1.00 2,833,300.00 2,833,300.00
Sub jumlah 2.A.2.24 14,451,695.84
25 R. Tidur (as 1-2/d-e)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 8.69 343,700.00 2,986,753.00
2 Plint homogeneous tile 10 x 60 cm m1 11.10 41,000.00 455,100.00
3 Urugan pasir t=3cm m3 0.26 265,300.00 69,163.71
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 43.43 40,600.00 1,763,258.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 8.69 100,900.00 876,821.00
2 List Plafond m1 12.00 26,900.00 322,800.00
3 Cat plafond, acrylic emulsi m2 8.69 40,400.00 351,076.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J2 unit 1.00 4,099,200.00 4,099,200.00
2 Pintu type P2 unit 1.00 2,833,300.00 2,833,300.00
Sub jumlah 2.A.2.25 13,757,471.71
26 KM/WC (as 1-2/d-f)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 2.00 166,800.00 333,600.00
2 Waterproofing coating m2 2.00 133,700.00 267,400.00
3 Urugan pasir t=3cm m3 0.06 265,300.00 15,918.00
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 11.46 217,300.00 2,490,258.00
2 Cat dinding, acrylic emulsi m2 4.55 40,600.00 184,730.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 2.00 127,000.00 254,000.00
2 List Plafond m1 6.50 26,900.00 174,850.00
3 Cat plafond, acrylic emulsi m2 2.00 40,400.00 80,800.00
Sanitary - -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 1.00 1,393,300.00 1,393,300.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 1.00 312,800.00 312,800.00
3 Floor Drain ex. Toto type TX1BN bh 1.00 432,400.00 432,400.00
4 Tempat tisue ex. Toto AW360 J bh 1.00 538,100.00 538,100.00
5 Tempat sabun ex. Toto S161 bh 1.00 96,900.00 96,900.00
6 Gantungan baju ex. Toto type TX704ACW bh 1.00 359,700.00 359,700.00
7 Bak Mandi fiber lapis keramik unit 1.00 2,003,300.00 2,003,300.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P3 unit 1.00 2,122,700.00 2,122,700.00
Sub jumlah 2.A.2.26 11,060,756.00
27 R. Keluarga dan R. Makan (as 2-3/d-f)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 30.29 343,700.00 10,410,673.00
2 Plint homogeneous tile 10 x 60 cm m1 20.77 41,000.00 851,570.00
3 Urugan pasir t=3cm m3 0.91 265,300.00 241,078.11
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 107.95 40,600.00 4,382,952.70
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 30.29 100,900.00 3,056,261.00
2 List Plafond m1 29.77 26,900.00 800,813.00
3 Cat plafond, acrylic emulsi m2 30.29 40,400.00 1,223,716.00
Saniter - -
1 Pek. Meja beton lapis keramik 30 x 30 cm m2 1.25 624,800.00 781,000.00
2 Kitchen sink unit 1.00 1,002,600.00 1,002,600.00
3 Kran Ex. Toto type. TX609 bh 1.00 284,000.00 284,000.00

EE GD. FLAT DOSEN Page 81


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

Pekerjaan Pintu dan jendela - -


1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
1 Jendela type J3 unit 1.00 2,807,200.00 2,807,200.00
2 Pintu type P1 unit 1.00 2,818,000.00 2,818,000.00
2 Pintu type P4 unit 1.00 2,818,000.00 2,818,000.00
Sub jumlah 2.A.2.27 35,576,063.81
28 Balkon (as 2-3/d-f)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 3.61 343,700.00 1,240,757.00
2 Plint homogeneous tile 10 x 60 cm m1 7.60 41,000.00 311,600.00
3 Urugan pasir t=3cm m3 0.11 265,300.00 28,731.99
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 31.29 40,600.00 1,270,475.50
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 3.61 100,900.00 364,249.00
2 List Plafond m1 8.50 26,900.00 228,650.00
3 Cat plafond, acrylic emulsi m2 3.61 40,400.00 145,844.00
Perlengkapan -
1 Railing balkon m1 3.00 650,000.00 1,950,000.00
Sub jumlah 2.A.2.28 5,540,307.49
29 R. Tidur (as 2-3/e-f)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 9.66 343,700.00 3,320,142.00
2 Plint homogeneous tile 10 x 60 cm m1 12.49 41,000.00 512,090.00
3 Urugan pasir t=3cm m3 0.29 265,300.00 76,883.94
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 46.45 40,600.00 1,885,930.90
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 9.66 100,900.00 974,694.00
2 List Plafond m1 13.39 26,900.00 360,191.00
3 Cat plafond, acrylic emulsi m2 9.66 40,400.00 390,264.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
2 Pintu type P2 unit 1.00 2,833,300.00 2,833,300.00
Sub jumlah 2.A.2.29 14,451,695.84
30 R. Tidur (as 2-3/d-e)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 8.69 343,700.00 2,986,753.00
2 Plint homogeneous tile 10 x 60 cm m1 11.10 41,000.00 455,100.00
3 Urugan pasir t=3cm m3 0.26 265,300.00 69,163.71
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 43.43 40,600.00 1,763,258.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 8.69 100,900.00 876,821.00
2 List Plafond m1 12.00 26,900.00 322,800.00
3 Cat plafond, acrylic emulsi m2 8.69 40,400.00 351,076.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J2 unit 1.00 4,099,200.00 4,099,200.00
2 Pintu type P2 unit 1.00 2,833,300.00 2,833,300.00
Sub jumlah 2.A.2.30 13,757,471.71
31 KM/WC (as 2-3/d-f)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 2.00 166,800.00 333,600.00
2 Waterproofing coating m2 2.00 133,700.00 267,400.00
3 Urugan pasir t=3cm m3 0.06 265,300.00 15,918.00
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 11.46 217,300.00 2,490,258.00
2 Cat dinding, acrylic emulsi m2 4.55 40,600.00 184,730.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 2.00 127,000.00 254,000.00
2 List Plafond m1 6.50 26,900.00 174,850.00
3 Cat plafond, acrylic emulsi m2 2.00 40,400.00 80,800.00
Sanitary - -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 1.00 1,393,300.00 1,393,300.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 1.00 312,800.00 312,800.00
3 Floor Drain ex. Toto type TX1BN bh 1.00 432,400.00 432,400.00
4 Tempat tisue ex. Toto AW360 J bh 1.00 538,100.00 538,100.00
5 Tempat sabun ex. Toto S161 bh 1.00 96,900.00 96,900.00

EE GD. FLAT DOSEN Page 82


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

6 Gantungan baju ex. Toto type TX704ACW bh 1.00 359,700.00 359,700.00


7 Bak Mandi fiber lapis keramik unit 1.00 2,003,300.00 2,003,300.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P3 unit 1.00 2,122,700.00 2,122,700.00
Sub jumlah 2.A.2.31 11,060,756.00
32 R. Keluarga dan R. Makan (as 3-4/d-f)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 30.29 343,700.00 10,410,673.00
2 Plint homogeneous tile 10 x 60 cm m1 20.77 41,000.00 851,570.00
3 Urugan pasir t=3cm m3 0.91 265,300.00 241,078.11
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 107.95 40,600.00 4,382,952.70
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 30.29 100,900.00 3,056,261.00
2 List Plafond m1 29.77 26,900.00 800,813.00
3 Cat plafond, acrylic emulsi m2 30.29 40,400.00 1,223,716.00
Saniter - -
1 Pek. Meja beton lapis keramik 30 x 30 cm m2 1.25 624,800.00 781,000.00
2 Kitchen sink unit 1.00 1,002,600.00 1,002,600.00
3 Kran Ex. Toto type. TX609 bh 1.00 284,000.00 284,000.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
1 Jendela type J3 unit 1.00 2,807,200.00 2,807,200.00
2 Pintu type P1 unit 1.00 2,818,000.00 2,818,000.00
2 Pintu type P4 unit 1.00 2,818,000.00 2,818,000.00
Sub jumlah 2.A.2.32 35,576,063.81
33 Balkon (as 3-4/d-f)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 3.61 343,700.00 1,240,757.00
2 Plint homogeneous tile 10 x 60 cm m1 7.60 41,000.00 311,600.00
3 Urugan pasir t=3cm m3 0.11 265,300.00 28,731.99
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 31.29 40,600.00 1,270,475.50
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 3.61 100,900.00 364,249.00
2 List Plafond m1 8.50 26,900.00 228,650.00
3 Cat plafond, acrylic emulsi m2 3.61 40,400.00 145,844.00
Perlengkapan -
1 Railing balkon m1 3.00 650,000.00 1,950,000.00
Sub jumlah 2.A.2.33 5,540,307.49
34 R. Tidur (as 3-4/e-f)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 9.66 343,700.00 3,320,142.00
2 Plint homogeneous tile 10 x 60 cm m1 12.49 41,000.00 512,090.00
3 Urugan pasir t=3cm m3 0.29 265,300.00 76,883.94
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 46.45 40,600.00 1,885,930.90
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 9.66 100,900.00 974,694.00
2 List Plafond m1 13.39 26,900.00 360,191.00
3 Cat plafond, acrylic emulsi m2 9.66 40,400.00 390,264.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
2 Pintu type P2 unit 1.00 2,833,300.00 2,833,300.00
Sub jumlah 2.A.2.34 14,451,695.84
35 R. Tidur (as 3-4/d-e)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 8.69 343,700.00 2,986,753.00
2 Plint homogeneous tile 10 x 60 cm m1 11.10 41,000.00 455,100.00
3 Urugan pasir t=3cm m3 0.26 265,300.00 69,163.71
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 43.43 40,600.00 1,763,258.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 8.69 100,900.00 876,821.00
2 List Plafond m1 12.00 26,900.00 322,800.00
3 Cat plafond, acrylic emulsi m2 8.69 40,400.00 351,076.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J2 unit 1.00 4,099,200.00 4,099,200.00

EE GD. FLAT DOSEN Page 83


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

2 Pintu type P2 unit 1.00 2,833,300.00 2,833,300.00


Sub jumlah 2.A.2.35 13,757,471.71
36 KM/WC (as 3-4/d-f)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 2.00 166,800.00 333,600.00
2 Waterproofing coating m2 2.00 133,700.00 267,400.00
3 Urugan pasir t=3cm m3 0.06 265,300.00 15,918.00
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 11.46 217,300.00 2,490,258.00
2 Cat dinding, acrylic emulsi m2 4.55 40,600.00 184,730.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 2.00 127,000.00 254,000.00
2 List Plafond m1 6.50 26,900.00 174,850.00
3 Cat plafond, acrylic emulsi m2 2.00 40,400.00 80,800.00
Sanitary - -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 1.00 1,393,300.00 1,393,300.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 1.00 312,800.00 312,800.00
3 Floor Drain ex. Toto type TX1BN bh 1.00 432,400.00 432,400.00
4 Tempat tisue ex. Toto AW360 J bh 1.00 538,100.00 538,100.00
5 Tempat sabun ex. Toto S161 bh 1.00 96,900.00 96,900.00
6 Gantungan baju ex. Toto type TX704ACW bh 1.00 359,700.00 359,700.00
7 Bak Mandi fiber lapis keramik unit 1.00 2,003,300.00 2,003,300.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P3 unit 1.00 2,122,700.00 2,122,700.00
Sub jumlah 2.A.2.36 11,060,756.00
37 R. Keluarga dan R. Makan (as 4-5/d-f)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 30.29 343,700.00 10,410,673.00
2 Plint homogeneous tile 10 x 60 cm m1 20.77 41,000.00 851,570.00
3 Urugan pasir t=3cm m3 0.91 265,300.00 241,078.11
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 107.95 40,600.00 4,382,952.70
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 30.29 100,900.00 3,056,261.00
2 List Plafond m1 29.77 26,900.00 800,813.00
3 Cat plafond, acrylic emulsi m2 30.29 40,400.00 1,223,716.00
Saniter - -
1 Pek. Meja beton lapis keramik 30 x 30 cm m2 1.25 624,800.00 781,000.00
2 Kitchen sink unit 1.00 1,002,600.00 1,002,600.00
3 Kran Ex. Toto type. TX609 bh 1.00 284,000.00 284,000.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
1 Jendela type J3 unit 1.00 2,807,200.00 2,807,200.00
2 Pintu type P1 unit 1.00 2,818,000.00 2,818,000.00
2 Pintu type P4 unit 1.00 2,818,000.00 2,818,000.00
Sub jumlah 2.A.2.37 35,576,063.81
38 Balkon (as 4-5/d-f)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 3.61 343,700.00 1,240,757.00
2 Plint homogeneous tile 10 x 60 cm m1 7.60 41,000.00 311,600.00
3 Urugan pasir t=3cm m3 0.11 265,300.00 28,731.99
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 31.29 40,600.00 1,270,475.50
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 3.61 100,900.00 364,249.00
2 List Plafond m1 8.50 26,900.00 228,650.00
3 Cat plafond, acrylic emulsi m2 3.61 40,400.00 145,844.00
Perlengkapan -
1 Railing balkon m1 3.00 650,000.00 1,950,000.00
Sub jumlah 2.A.2.38 5,540,307.49
39 R. Tidur (as 4-5/e-f)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 9.66 343,700.00 3,320,142.00
2 Plint homogeneous tile 10 x 60 cm m1 12.49 41,000.00 512,090.00
3 Urugan pasir t=3cm m3 0.29 265,300.00 76,883.94
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 41.51 40,600.00 1,685,265.40
Pekerjaan Plafond - -

EE GD. FLAT DOSEN Page 84


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

1 Plafond gypsum 9 mm, rangka metal furing m2 9.66 100,900.00 974,694.00


2 List Plafond m1 13.39 26,900.00 360,191.00
3 Cat plafond, acrylic emulsi m2 9.66 40,400.00 390,264.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
2 Pintu type P2 unit 1.00 2,833,300.00 2,833,300.00
Sub jumlah 2.A.2.39 14,251,030.34
40 R. Tidur (as 4-5/d-e)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 8.69 343,700.00 2,986,753.00
2 Plint homogeneous tile 10 x 60 cm m1 11.10 41,000.00 455,100.00
3 Urugan pasir t=3cm m3 0.26 265,300.00 69,163.71
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 43.43 40,600.00 1,763,258.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 8.69 100,900.00 876,821.00
2 List Plafond m1 12.00 26,900.00 322,800.00
3 Cat plafond, acrylic emulsi m2 8.69 40,400.00 351,076.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J2 unit 1.00 4,099,200.00 4,099,200.00
2 Pintu type P2 unit 1.00 2,833,300.00 2,833,300.00
Sub jumlah 2.A.2.40 13,757,471.71
41 KM/WC (as 4-5/d-f)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 2.00 166,800.00 333,600.00
2 Waterproofing coating m2 2.00 133,700.00 267,400.00
3 Urugan pasir t=3cm m3 0.06 265,300.00 15,918.00
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 11.46 217,300.00 2,490,258.00
2 Cat dinding, acrylic emulsi m2 4.55 40,600.00 184,730.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 2.00 127,000.00 254,000.00
2 List Plafond m1 6.50 26,900.00 174,850.00
3 Cat plafond, acrylic emulsi m2 2.00 40,400.00 80,800.00
Sanitary - -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 1.00 1,393,300.00 1,393,300.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 1.00 312,800.00 312,800.00
3 Floor Drain ex. Toto type TX1BN bh 1.00 432,400.00 432,400.00
4 Tempat tisue ex. Toto AW360 J bh 1.00 538,100.00 538,100.00
5 Tempat sabun ex. Toto S161 bh 1.00 96,900.00 96,900.00
6 Gantungan baju ex. Toto type TX704ACW bh 1.00 359,700.00 359,700.00
7 Bak Mandi fiber lapis keramik unit 1.00 2,003,300.00 2,003,300.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P3 unit 1.00 2,122,700.00 2,122,700.00
Sub jumlah 2.A.2.41 11,060,756.00
42 R. Keluarga dan R. Makan (as 5-6/d-f)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 30.29 343,700.00 10,410,673.00
2 Plint homogeneous tile 10 x 60 cm m1 20.77 41,000.00 851,570.00
3 Urugan pasir t=3cm m3 0.91 265,300.00 241,078.11
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 107.95 40,600.00 4,382,952.70
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 30.29 100,900.00 3,056,261.00
2 List Plafond m1 29.77 26,900.00 800,813.00
3 Cat plafond, acrylic emulsi m2 30.29 40,400.00 1,223,716.00
Saniter - -
1 Pek. Meja beton lapis keramik 30 x 30 cm m2 1.25 624,800.00 781,000.00
2 Kitchen sink unit 1.00 1,002,600.00 1,002,600.00
3 Kran Ex. Toto type. TX609 bh 1.00 284,000.00 284,000.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
1 Jendela type J3 unit 1.00 2,807,200.00 2,807,200.00
2 Pintu type P1 unit 1.00 2,818,000.00 2,818,000.00
2 Pintu type P4 unit 1.00 2,818,000.00 2,818,000.00
Sub jumlah 2.A.2.42 35,576,063.81
43 Balkon (as 5-6/d-f)
Pekerjaan Lantai

EE GD. FLAT DOSEN Page 85


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 3.61 343,700.00 1,240,757.00


2 Plint homogeneous tile 10 x 60 cm m1 7.60 41,000.00 311,600.00
3 Urugan pasir t=3cm m3 0.11 265,300.00 28,731.99
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 31.29 40,600.00 1,270,475.50
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 3.61 100,900.00 364,249.00
2 List Plafond m1 8.50 26,900.00 228,650.00
3 Cat plafond, acrylic emulsi m2 3.61 40,400.00 145,844.00
Perlengkapan -
1 Railing balkon m1 3.00 650,000.00 1,950,000.00
Sub jumlah 2.A.2.43 5,540,307.49
44 R. Tidur (as 5-6/e-f)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 9.66 343,700.00 3,320,142.00
2 Plint homogeneous tile 10 x 60 cm m1 12.49 41,000.00 512,090.00
3 Urugan pasir t=3cm m3 0.29 265,300.00 76,883.94
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 41.51 40,600.00 1,685,265.40
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 9.66 100,900.00 974,694.00
2 List Plafond m1 13.39 26,900.00 360,191.00
3 Cat plafond, acrylic emulsi m2 9.66 40,400.00 390,264.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
2 Pintu type P2 unit 1.00 2,833,300.00 2,833,300.00
Sub jumlah 2.A.2.44 14,251,030.34
45 R. Tidur (as 5-6/d-e)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 8.69 343,700.00 2,986,753.00
2 Plint homogeneous tile 10 x 60 cm m1 11.10 41,000.00 455,100.00
3 Urugan pasir t=3cm m3 0.26 265,300.00 69,163.71
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 43.43 40,600.00 1,763,258.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 8.69 100,900.00 876,821.00
2 List Plafond m1 12.00 26,900.00 322,800.00
3 Cat plafond, acrylic emulsi m2 8.69 40,400.00 351,076.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J2 unit 1.00 4,099,200.00 4,099,200.00
2 Pintu type P2 unit 1.00 2,833,300.00 2,833,300.00
Sub jumlah 2.A.2.45 13,757,471.71
46 KM/WC (as 5-6/d-f)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 2.00 166,800.00 333,600.00
2 Waterproofing coating m2 2.00 133,700.00 267,400.00
3 Urugan pasir t=3cm m3 0.06 265,300.00 15,918.00
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 11.46 217,300.00 2,490,258.00
2 Cat dinding, acrylic emulsi m2 4.55 40,600.00 184,730.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 2.00 127,000.00 254,000.00
2 List Plafond m1 6.50 26,900.00 174,850.00
3 Cat plafond, acrylic emulsi m2 2.00 40,400.00 80,800.00
Sanitary - -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 1.00 1,393,300.00 1,393,300.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 1.00 312,800.00 312,800.00
3 Floor Drain ex. Toto type TX1BN bh 1.00 432,400.00 432,400.00
4 Tempat tisue ex. Toto AW360 J bh 1.00 538,100.00 538,100.00
5 Tempat sabun ex. Toto S161 bh 1.00 96,900.00 96,900.00
6 Gantungan baju ex. Toto type TX704ACW bh 1.00 359,700.00 359,700.00
7 Bak Mandi fiber lapis keramik unit 1.00 2,003,300.00 2,003,300.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P3 unit 1.00 2,122,700.00 2,122,700.00
Sub jumlah 2.A.2.46 11,060,756.00
47 Area Tangga (as 1-2/a-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile uk. 30 x 30 cm polished (bordes+anak tangga) m2 37.10 378,900.00 14,057,190.00

EE GD. FLAT DOSEN Page 86


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

2 Pasangan lantai keramik step nozing 10 x 30 m1 62.20 65,700.00 4,086,540.00


Pekerjaan Dinding - -
1 Plint homogeneous tile 10 x 30 cm m1 46.10 41,900.00 1,931,590.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 30.00 100,900.00 3,027,000.00
2 List Plafond m1 22.00 26,900.00 591,800.00
3 Cat plafond+tangga, acrylic emulsi m2 60.00 40,400.00 2,424,000.00
Railling -
1 Pekerjaan railing pipa BSP kombinasi besi tempa fin. Cat Duco m1 21.56 755,000.00 16,277,800.00
2 Pekerjaan hand railing pipa BSP fin. Cat Duco m1 16.56 465,500.00 7,708,680.00
Pekerjaan Pintu dan jendela 284,000.00 -
1 Jendela type J1 unit 2.00 4,098,200.00 8,196,400.00
Sub jumlah 2.A.2.47 58,301,000.00
Jumlah 2.A.2 887,577,478.32
Jumlah 2.A 1,249,000,666.81
B FINISHING EXTERIOR
1 Cat dinding, kolom, balok struktur luar weathershield, acrylic emulsi m2 221.19 40,200.00 8,891,838.00
Sub jumlah 2.B.1 8,891,838.00
Jumlah 2.B 8,891,838.00
III PEKERJAAN LANTAI 2
A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding
1 Pasangan dinding bata merah ukuran tebal ½ bata, campuran spesi 1 Pc : 4 Ps m2 1,197.10 112,900.00 135,152,985.15
2 Pek. Plesteran m2 2,394.21 46,100.00 110,372,942.70
3 Pek. Acian m1 2,394.21 20,900.00 50,038,926.30
4 Plesteran + acian kolom, balok, dinding, lisplank beton struktur m2 62.21 67,000.00 4,167,936.00
5 Kolom praktis + ring balok ukuran 12 x 12 Cm m3 6.58 9,370,200.00 61,690,398.34
Sub Jumlah 3.A.1 361,423,188.49
2 Pekerjaan Finishing -
1 Koridor (as 1-6/b-e)
Pekerjaan Lantai
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 137.13 343,700.00 47,131,581.00
2 Plint homogeneous tile 10 x 60 cm m1 86.20 41,000.00 3,534,200.00
3 Urugan pasir t=3cm m3 4.11 265,300.00 1,091,417.67
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 362.68 40,600.00 14,724,808.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 137.13 100,900.00 13,836,417.00
2 List Plafond m1 101.20 26,900.00 2,722,280.00
3 Cat plafond, acrylic emulsi m2 137.13 40,400.00 5,540,052.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J4 unit 2.00 8,810,200.00 17,620,400.00
Sub jumlah 3.A.2.1 106,201,155.67
2 R. Keluarga dan R. Makan (as 1-2/a-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 30.29 343,700.00 10,410,673.00
2 Plint homogeneous tile 10 x 60 cm m1 20.77 41,000.00 851,570.00
3 Urugan pasir t=3cm m3 0.91 265,300.00 241,078.11
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 107.95 40,600.00 4,382,952.70
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 30.29 100,900.00 3,056,261.00
2 List Plafond m1 29.77 26,900.00 800,813.00
3 Cat plafond, acrylic emulsi m2 30.29 40,400.00 1,223,716.00
Saniter - -
1 Pek. Meja beton lapis keramik 30 x 30 cm m2 1.25 624,800.00 781,000.00
2 Kitchen sink unit 1.00 1,002,600.00 1,002,600.00
3 Kran Ex. Toto type. TX609 bh 1.00 284,000.00 284,000.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
1 Jendela type J3 unit 1.00 2,807,200.00 2,807,200.00
2 Pintu type P1 unit 1.00 2,818,000.00 2,818,000.00
2 Pintu type P4 unit 1.00 2,818,000.00 2,818,000.00
Sub jumlah 3.A.2.2 35,576,063.81
3 Balkon (as 1-2/a-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 3.61 343,700.00 1,240,757.00

EE GD. FLAT DOSEN Page 87


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

2 Plint homogeneous tile 10 x 60 cm m1 7.60 41,000.00 311,600.00


3 Urugan pasir t=3cm m3 0.11 265,300.00 28,731.99
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 31.29 40,600.00 1,270,475.50
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 3.61 100,900.00 364,249.00
2 List Plafond m1 8.50 26,900.00 228,650.00
3 Cat plafond, acrylic emulsi m2 3.61 40,400.00 145,844.00
Perlengkapan -
1 Railing balkon m1 3.00 650,000.00 1,950,000.00
Sub jumlah 3.A.2.3 5,540,307.49
4 R. Tidur (as 1-2/a-b)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 9.66 343,700.00 3,320,142.00
2 Plint homogeneous tile 10 x 60 cm m1 12.49 41,000.00 512,090.00
3 Urugan pasir t=3cm m3 0.29 265,300.00 76,883.94
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 46.45 40,600.00 1,885,930.90
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 9.66 100,900.00 974,694.00
2 List Plafond m1 13.39 26,900.00 360,191.00
3 Cat plafond, acrylic emulsi m2 9.66 40,400.00 390,264.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
2 Pintu type P2 unit 1.00 2,833,300.00 2,833,300.00
Sub jumlah 3.A.2.4 14,451,695.84
5 R. Tidur (as 1-2/b-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 8.69 343,700.00 2,986,753.00
2 Plint homogeneous tile 10 x 60 cm m1 11.10 41,000.00 455,100.00
3 Urugan pasir t=3cm m3 0.26 265,300.00 69,163.71
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 43.43 40,600.00 1,763,258.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 8.69 100,900.00 876,821.00
2 List Plafond m1 12.00 26,900.00 322,800.00
3 Cat plafond, acrylic emulsi m2 8.69 40,400.00 351,076.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J2 unit 1.00 4,099,200.00 4,099,200.00
2 Pintu type P2 unit 1.00 2,833,300.00 2,833,300.00
Sub jumlah 3.A.2.5 13,757,471.71
6 KM/WC (as 1-2/a-c)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 2.00 166,800.00 333,600.00
2 Waterproofing coating m2 2.00 133,700.00 267,400.00
3 Urugan pasir t=3cm m3 0.06 265,300.00 15,918.00
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 11.46 217,300.00 2,490,258.00
2 Cat dinding, acrylic emulsi m2 4.55 40,600.00 184,730.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 2.00 127,000.00 254,000.00
2 List Plafond m1 6.50 26,900.00 174,850.00
3 Cat plafond, acrylic emulsi m2 2.00 40,400.00 80,800.00
Sanitary - -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 1.00 1,393,300.00 1,393,300.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 1.00 312,800.00 312,800.00
3 Floor Drain ex. Toto type TX1BN bh 1.00 432,400.00 432,400.00
4 Tempat tisue ex. Toto AW360 J bh 1.00 538,100.00 538,100.00
5 Tempat sabun ex. Toto S161 bh 1.00 96,900.00 96,900.00
6 Gantungan baju ex. Toto type TX704ACW bh 1.00 359,700.00 359,700.00
7 Bak Mandi fiber lapis keramik unit 1.00 2,003,300.00 2,003,300.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P3 unit 1.00 2,122,700.00 2,122,700.00
Sub jumlah 3.A.2.6 11,060,756.00
7 R. Keluarga dan R. Makan (as 2-3/a-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 30.29 343,700.00 10,410,673.00
2 Plint homogeneous tile 10 x 60 cm m1 20.77 41,000.00 851,570.00

EE GD. FLAT DOSEN Page 88


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

3 Urugan pasir t=3cm m3 0.91 265,300.00 241,078.11


Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 107.95 40,600.00 4,382,952.70
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 30.29 100,900.00 3,056,261.00
2 List Plafond m1 29.77 26,900.00 800,813.00
3 Cat plafond, acrylic emulsi m2 30.29 40,400.00 1,223,716.00
Saniter - -
1 Pek. Meja beton lapis keramik 30 x 30 cm m2 1.25 624,800.00 781,000.00
2 Kitchen sink unit 1.00 1,002,600.00 1,002,600.00
3 Kran Ex. Toto type. TX609 bh 1.00 284,000.00 284,000.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
1 Jendela type J3 unit 1.00 2,807,200.00 2,807,200.00
2 Pintu type P1 unit 1.00 2,818,000.00 2,818,000.00
2 Pintu type P4 unit 1.00 2,818,000.00 2,818,000.00
Sub jumlah 3.A.2.7 35,576,063.81
8 Balkon (as 2-3/a-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 3.61 343,700.00 1,240,757.00
2 Plint homogeneous tile 10 x 60 cm m1 7.60 41,000.00 311,600.00
3 Urugan pasir t=3cm m3 0.11 265,300.00 28,731.99
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 31.29 40,600.00 1,270,475.50
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 3.61 100,900.00 364,249.00
2 List Plafond m1 8.50 26,900.00 228,650.00
3 Cat plafond, acrylic emulsi m2 3.61 40,400.00 145,844.00
Perlengkapan -
1 Railing balkon m1 3.00 650,000.00 1,950,000.00
Sub jumlah 3.A.2.8 5,540,307.49
9 R. Tidur (as 2-3/a-b)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 9.66 343,700.00 3,320,142.00
2 Plint homogeneous tile 10 x 60 cm m1 12.49 41,000.00 512,090.00
3 Urugan pasir t=3cm m3 0.29 265,300.00 76,883.94
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 46.45 40,600.00 1,885,930.90
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 9.66 100,900.00 974,694.00
2 List Plafond m1 13.39 26,900.00 360,191.00
3 Cat plafond, acrylic emulsi m2 9.66 40,400.00 390,264.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
2 Pintu type P2 unit 1.00 2,833,300.00 2,833,300.00
Sub jumlah 3.A.2.9 14,451,695.84
10 R. Tidur (as 2-3/b-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 8.69 343,700.00 2,986,753.00
2 Plint homogeneous tile 10 x 60 cm m1 11.10 41,000.00 455,100.00
3 Urugan pasir t=3cm m3 0.26 265,300.00 69,163.71
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 43.43 40,600.00 1,763,258.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 8.69 100,900.00 876,821.00
2 List Plafond m1 12.00 26,900.00 322,800.00
3 Cat plafond, acrylic emulsi m2 8.69 40,400.00 351,076.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J2 unit 1.00 4,099,200.00 4,099,200.00
2 Pintu type P2 unit 1.00 2,833,300.00 2,833,300.00
Sub jumlah 3.A.2.10 13,757,471.71
11 KM/WC (as 2-3/a-c)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 2.00 166,800.00 333,600.00
2 Waterproofing coating m2 2.00 133,700.00 267,400.00
3 Urugan pasir t=3cm m3 0.06 265,300.00 15,918.00
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 11.46 217,300.00 2,490,258.00

EE GD. FLAT DOSEN Page 89


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

2 Cat dinding, acrylic emulsi m2 4.55 40,600.00 184,730.00


Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 2.00 127,000.00 254,000.00
2 List Plafond m1 6.50 26,900.00 174,850.00
3 Cat plafond, acrylic emulsi m2 2.00 40,400.00 80,800.00
Sanitary - -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 1.00 1,393,300.00 1,393,300.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 1.00 312,800.00 312,800.00
3 Floor Drain ex. Toto type TX1BN bh 1.00 432,400.00 432,400.00
4 Tempat tisue ex. Toto AW360 J bh 1.00 538,100.00 538,100.00
5 Tempat sabun ex. Toto S161 bh 1.00 96,900.00 96,900.00
6 Gantungan baju ex. Toto type TX704ACW bh 1.00 359,700.00 359,700.00
7 Bak Mandi fiber lapis keramik unit 1.00 2,003,300.00 2,003,300.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P3 unit 1.00 2,122,700.00 2,122,700.00
Sub jumlah 3.A.2.11 11,060,756.00
12 R. Keluarga dan R. Makan (as 4-5/a-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 30.29 343,700.00 10,410,673.00
2 Plint homogeneous tile 10 x 60 cm m1 20.77 41,000.00 851,570.00
3 Urugan pasir t=3cm m3 0.91 265,300.00 241,078.11
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 107.95 40,600.00 4,382,952.70
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 30.29 100,900.00 3,056,261.00
2 List Plafond m1 29.77 26,900.00 800,813.00
3 Cat plafond, acrylic emulsi m2 30.29 40,400.00 1,223,716.00
Saniter - -
1 Pek. Meja beton lapis keramik 30 x 30 cm m2 1.25 624,800.00 781,000.00
2 Kitchen sink unit 1.00 1,002,600.00 1,002,600.00
3 Kran Ex. Toto type. TX609 bh 1.00 284,000.00 284,000.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
1 Jendela type J3 unit 1.00 2,807,200.00 2,807,200.00
2 Pintu type P1 unit 1.00 2,818,000.00 2,818,000.00
2 Pintu type P4 unit 1.00 2,818,000.00 2,818,000.00
Sub jumlah 3.A.2.12 35,576,063.81
13 Balkon (as 4-5/a-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 3.61 343,700.00 1,240,757.00
2 Plint homogeneous tile 10 x 60 cm m1 7.60 41,000.00 311,600.00
3 Urugan pasir t=3cm m3 0.11 265,300.00 28,731.99
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 31.29 40,600.00 1,270,475.50
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 3.61 100,900.00 364,249.00
2 List Plafond m1 8.50 26,900.00 228,650.00
3 Cat plafond, acrylic emulsi m2 3.61 40,400.00 145,844.00
Perlengkapan -
1 Railing balkon m1 3.00 650,000.00 1,950,000.00
Sub jumlah 3.A.2.13 5,540,307.49
14 R. Tidur (as 4-5/a-b)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 9.66 343,700.00 3,320,142.00
2 Plint homogeneous tile 10 x 60 cm m1 12.49 41,000.00 512,090.00
3 Urugan pasir t=3cm m3 0.29 265,300.00 76,883.94
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 46.45 40,600.00 1,885,930.90
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 9.66 100,900.00 974,694.00
2 List Plafond m1 13.39 26,900.00 360,191.00
3 Cat plafond, acrylic emulsi m2 9.66 40,400.00 390,264.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
2 Pintu type P2 unit 1.00 2,833,300.00 2,833,300.00
Sub jumlah 3.A.2.14 14,451,695.84
15 R. Tidur (as 4-5/b-c)
Pekerjaan Lantai

EE GD. FLAT DOSEN Page 90


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 8.69 343,700.00 2,986,753.00


2 Plint homogeneous tile 10 x 60 cm m1 11.10 41,000.00 455,100.00
3 Urugan pasir t=3cm m3 0.26 265,300.00 69,163.71
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 43.43 40,600.00 1,763,258.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 8.69 100,900.00 876,821.00
2 List Plafond m1 12.00 26,900.00 322,800.00
3 Cat plafond, acrylic emulsi m2 8.69 40,400.00 351,076.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J2 unit 1.00 4,099,200.00 4,099,200.00
2 Pintu type P2 unit 1.00 2,833,300.00 2,833,300.00
Sub jumlah 3.A.2.15 13,757,471.71
16 KM/WC (as 4-5/a-c)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 2.00 166,800.00 333,600.00
2 Waterproofing coating m2 2.00 133,700.00 267,400.00
3 Urugan pasir t=3cm m3 0.06 265,300.00 15,918.00
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 11.46 217,300.00 2,490,258.00
2 Cat dinding, acrylic emulsi m2 4.55 40,600.00 184,730.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 2.00 127,000.00 254,000.00
2 List Plafond m1 6.50 26,900.00 174,850.00
3 Cat plafond, acrylic emulsi m2 2.00 40,400.00 80,800.00
Sanitary - -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 1.00 1,393,300.00 1,393,300.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 1.00 312,800.00 312,800.00
3 Floor Drain ex. Toto type TX1BN bh 1.00 432,400.00 432,400.00
4 Tempat tisue ex. Toto AW360 J bh 1.00 538,100.00 538,100.00
5 Tempat sabun ex. Toto S161 bh 1.00 96,900.00 96,900.00
6 Gantungan baju ex. Toto type TX704ACW bh 1.00 359,700.00 359,700.00
7 Bak Mandi fiber lapis keramik unit 1.00 2,003,300.00 2,003,300.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P3 unit 1.00 2,122,700.00 2,122,700.00
Sub jumlah 3.A.2.16 11,060,756.00
17 R. Keluarga dan R. Makan (as 5-6/a-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 30.29 343,700.00 10,410,673.00
2 Plint homogeneous tile 10 x 60 cm m1 20.77 41,000.00 851,570.00
3 Urugan pasir t=3cm m3 0.91 265,300.00 241,078.11
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 107.95 40,600.00 4,382,952.70
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 30.29 100,900.00 3,056,261.00
2 List Plafond m1 29.77 26,900.00 800,813.00
3 Cat plafond, acrylic emulsi m2 30.29 40,400.00 1,223,716.00
Saniter - -
1 Pek. Meja beton lapis keramik 30 x 30 cm m2 1.25 624,800.00 781,000.00
2 Kitchen sink unit 1.00 1,002,600.00 1,002,600.00
3 Kran Ex. Toto type. TX609 bh 1.00 284,000.00 284,000.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
1 Jendela type J3 unit 1.00 2,807,200.00 2,807,200.00
2 Pintu type P1 unit 1.00 2,818,000.00 2,818,000.00
2 Pintu type P4 unit 1.00 2,818,000.00 2,818,000.00
Sub jumlah 3.A.2.17 35,576,063.81
18 Balkon (as 5-6/a-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 3.61 343,700.00 1,240,757.00
2 Plint homogeneous tile 10 x 60 cm m1 7.60 41,000.00 311,600.00
3 Urugan pasir t=3cm m3 0.11 265,300.00 28,731.99
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 31.29 40,600.00 1,270,475.50
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 3.61 100,900.00 364,249.00
2 List Plafond m1 8.50 26,900.00 228,650.00
3 Cat plafond, acrylic emulsi m2 3.61 40,400.00 145,844.00

EE GD. FLAT DOSEN Page 91


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

Perlengkapan -
1 Railing balkon m1 3.00 650,000.00 1,950,000.00
Sub jumlah 3.A.2.18 5,540,307.49
19 R. Tidur (as 5-6/a-b)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 9.66 343,700.00 3,320,142.00
2 Plint homogeneous tile 10 x 60 cm m1 12.49 41,000.00 512,090.00
3 Urugan pasir t=3cm m3 0.29 265,300.00 76,883.94
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 46.45 40,600.00 1,885,930.90
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 9.66 100,900.00 974,694.00
2 List Plafond m1 13.39 26,900.00 360,191.00
3 Cat plafond, acrylic emulsi m2 9.66 40,400.00 390,264.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
2 Pintu type P2 unit 1.00 2,833,300.00 2,833,300.00
Sub jumlah 3.A.2.19 14,451,695.84
20 R. Tidur (as 5-6/b-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 8.69 343,700.00 2,986,753.00
2 Plint homogeneous tile 10 x 60 cm m1 11.10 41,000.00 455,100.00
3 Urugan pasir t=3cm m3 0.26 265,300.00 69,163.71
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 43.43 40,600.00 1,763,258.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 8.69 100,900.00 876,821.00
2 List Plafond m1 12.00 26,900.00 322,800.00
3 Cat plafond, acrylic emulsi m2 8.69 40,400.00 351,076.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J2 unit 1.00 4,099,200.00 4,099,200.00
2 Pintu type P2 unit 1.00 2,833,300.00 2,833,300.00
Sub jumlah 3.A.2.20 13,757,471.71
21 KM/WC (as 5-6/a-c)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 2.00 166,800.00 333,600.00
2 Waterproofing coating m2 2.00 133,700.00 267,400.00
3 Urugan pasir t=3cm m3 0.06 265,300.00 15,918.00
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 11.46 217,300.00 2,490,258.00
2 Cat dinding, acrylic emulsi m2 4.55 40,600.00 184,730.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 2.00 127,000.00 254,000.00
2 List Plafond m1 6.50 26,900.00 174,850.00
3 Cat plafond, acrylic emulsi m2 2.00 40,400.00 80,800.00
Sanitary - -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 1.00 1,393,300.00 1,393,300.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 1.00 312,800.00 312,800.00
3 Floor Drain ex. Toto type TX1BN bh 1.00 432,400.00 432,400.00
4 Tempat tisue ex. Toto AW360 J bh 1.00 538,100.00 538,100.00
5 Tempat sabun ex. Toto S161 bh 1.00 96,900.00 96,900.00
6 Gantungan baju ex. Toto type TX704ACW bh 1.00 359,700.00 359,700.00
7 Bak Mandi fiber lapis keramik unit 1.00 2,003,300.00 2,003,300.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P3 unit 1.00 2,122,700.00 2,122,700.00
Sub jumlah 3.A.2.21 11,060,756.00
22 R. Keluarga dan R. Makan (as 1-2/d-f)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 30.29 343,700.00 10,410,673.00
2 Plint homogeneous tile 10 x 60 cm m1 20.77 41,000.00 851,570.00
3 Urugan pasir t=3cm m3 0.91 265,300.00 241,078.11
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 107.95 40,600.00 4,382,952.70
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 30.29 100,900.00 3,056,261.00
2 List Plafond m1 29.77 26,900.00 800,813.00
3 Cat plafond, acrylic emulsi m2 30.29 40,400.00 1,223,716.00
Saniter - -

EE GD. FLAT DOSEN Page 92


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

1 Pek. Meja beton lapis keramik 30 x 30 cm m2 1.25 624,800.00 781,000.00


2 Kitchen sink unit 1.00 1,002,600.00 1,002,600.00
3 Kran Ex. Toto type. TX609 bh 1.00 284,000.00 284,000.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
1 Jendela type J3 unit 1.00 2,807,200.00 2,807,200.00
2 Pintu type P1 unit 1.00 2,818,000.00 2,818,000.00
2 Pintu type P4 unit 1.00 2,818,000.00 2,818,000.00
Sub jumlah 3.A.2.22 35,576,063.81
23 Balkon (as 1-2/d-f)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 3.61 343,700.00 1,240,757.00
2 Plint homogeneous tile 10 x 60 cm m1 7.60 41,000.00 311,600.00
3 Urugan pasir t=3cm m3 0.11 265,300.00 28,731.99
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 31.29 40,600.00 1,270,475.50
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 3.61 100,900.00 364,249.00
2 List Plafond m1 8.50 26,900.00 228,650.00
3 Cat plafond, acrylic emulsi m2 3.61 40,400.00 145,844.00
Perlengkapan -
1 Railing balkon m1 3.00 650,000.00 1,950,000.00
Sub jumlah 3.A.2.23 5,540,307.49
24 R. Tidur (as 1-2/e-f)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 9.66 343,700.00 3,320,142.00
2 Plint homogeneous tile 10 x 60 cm m1 12.49 41,000.00 512,090.00
3 Urugan pasir t=3cm m3 0.29 265,300.00 76,883.94
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 46.45 40,600.00 1,885,930.90
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 9.66 100,900.00 974,694.00
2 List Plafond m1 13.39 26,900.00 360,191.00
3 Cat plafond, acrylic emulsi m2 9.66 40,400.00 390,264.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
2 Pintu type P2 unit 1.00 2,833,300.00 2,833,300.00
Sub jumlah 3.A.2.24 14,451,695.84
25 R. Tidur (as 1-2/d-e)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 8.69 343,700.00 2,986,753.00
2 Plint homogeneous tile 10 x 60 cm m1 11.10 41,000.00 455,100.00
3 Urugan pasir t=3cm m3 0.26 265,300.00 69,163.71
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 43.43 40,600.00 1,763,258.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 8.69 100,900.00 876,821.00
2 List Plafond m1 12.00 26,900.00 322,800.00
3 Cat plafond, acrylic emulsi m2 8.69 40,400.00 351,076.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J2 unit 1.00 4,099,200.00 4,099,200.00
2 Pintu type P2 unit 1.00 2,833,300.00 2,833,300.00
Sub jumlah 3.A.2.25 13,757,471.71
26 KM/WC (as 1-2/d-f)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 2.00 166,800.00 333,600.00
2 Waterproofing coating m2 2.00 133,700.00 267,400.00
3 Urugan pasir t=3cm m3 0.06 265,300.00 15,918.00
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 11.46 217,300.00 2,490,258.00
2 Cat dinding, acrylic emulsi m2 4.55 40,600.00 184,730.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 2.00 127,000.00 254,000.00
2 List Plafond m1 6.50 26,900.00 174,850.00
3 Cat plafond, acrylic emulsi m2 2.00 40,400.00 80,800.00
Sanitary - -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 1.00 1,393,300.00 1,393,300.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 1.00 312,800.00 312,800.00

EE GD. FLAT DOSEN Page 93


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

3 Floor Drain ex. Toto type TX1BN bh 1.00 432,400.00 432,400.00


4 Tempat tisue ex. Toto AW360 J bh 1.00 538,100.00 538,100.00
5 Tempat sabun ex. Toto S161 bh 1.00 96,900.00 96,900.00
6 Gantungan baju ex. Toto type TX704ACW bh 1.00 359,700.00 359,700.00
7 Bak Mandi fiber lapis keramik unit 1.00 2,003,300.00 2,003,300.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P3 unit 1.00 2,122,700.00 2,122,700.00
Sub jumlah 3.A.2.26 11,060,756.00
27 R. Keluarga dan R. Makan (as 2-3/d-f)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 30.29 343,700.00 10,410,673.00
2 Plint homogeneous tile 10 x 60 cm m1 20.77 41,000.00 851,570.00
3 Urugan pasir t=3cm m3 0.91 265,300.00 241,078.11
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 107.95 40,600.00 4,382,952.70
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 30.29 100,900.00 3,056,261.00
2 List Plafond m1 29.77 26,900.00 800,813.00
3 Cat plafond, acrylic emulsi m2 30.29 40,400.00 1,223,716.00
Saniter - -
1 Pek. Meja beton lapis keramik 30 x 30 cm m2 1.25 624,800.00 781,000.00
2 Kitchen sink unit 1.00 1,002,600.00 1,002,600.00
3 Kran Ex. Toto type. TX609 bh 1.00 284,000.00 284,000.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
1 Jendela type J3 unit 1.00 2,807,200.00 2,807,200.00
2 Pintu type P1 unit 1.00 2,818,000.00 2,818,000.00
2 Pintu type P4 unit 1.00 2,818,000.00 2,818,000.00
Sub jumlah 3.A.2.27 35,576,063.81
28 Balkon (as 2-3/d-f)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 3.61 343,700.00 1,240,757.00
2 Plint homogeneous tile 10 x 60 cm m1 7.60 41,000.00 311,600.00
3 Urugan pasir t=3cm m3 0.11 265,300.00 28,731.99
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 31.29 40,600.00 1,270,475.50
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 3.61 100,900.00 364,249.00
2 List Plafond m1 8.50 26,900.00 228,650.00
3 Cat plafond, acrylic emulsi m2 3.61 40,400.00 145,844.00
Perlengkapan -
1 Railing balkon m1 3.00 650,000.00 1,950,000.00
Sub jumlah 3.A.2.28 5,540,307.49
29 R. Tidur (as 2-3/e-f)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 9.66 343,700.00 3,320,142.00
2 Plint homogeneous tile 10 x 60 cm m1 12.49 41,000.00 512,090.00
3 Urugan pasir t=3cm m3 0.29 265,300.00 76,883.94
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 46.45 40,600.00 1,885,930.90
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 9.66 100,900.00 974,694.00
2 List Plafond m1 13.39 26,900.00 360,191.00
3 Cat plafond, acrylic emulsi m2 9.66 40,400.00 390,264.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
2 Pintu type P2 unit 1.00 2,833,300.00 2,833,300.00
Sub jumlah 3.A.2.29 14,451,695.84
30 R. Tidur (as 2-3/d-e)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 8.69 343,700.00 2,986,753.00
2 Plint homogeneous tile 10 x 60 cm m1 11.10 41,000.00 455,100.00
3 Urugan pasir t=3cm m3 0.26 265,300.00 69,163.71
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 43.43 40,600.00 1,763,258.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 8.69 100,900.00 876,821.00
2 List Plafond m1 12.00 26,900.00 322,800.00

EE GD. FLAT DOSEN Page 94


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

3 Cat plafond, acrylic emulsi m2 8.69 40,400.00 351,076.00


Pekerjaan Pintu dan jendela - -
1 Jendela type J2 unit 1.00 4,099,200.00 4,099,200.00
2 Pintu type P2 unit 1.00 2,833,300.00 2,833,300.00
Sub jumlah 3.A.2.30 13,757,471.71
31 KM/WC (as 2-3/d-f)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 2.00 166,800.00 333,600.00
2 Waterproofing coating m2 2.00 133,700.00 267,400.00
3 Urugan pasir t=3cm m3 0.06 265,300.00 15,918.00
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 11.46 217,300.00 2,490,258.00
2 Cat dinding, acrylic emulsi m2 4.55 40,600.00 184,730.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 2.00 127,000.00 254,000.00
2 List Plafond m1 6.50 26,900.00 174,850.00
3 Cat plafond, acrylic emulsi m2 2.00 40,400.00 80,800.00
Sanitary - -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 1.00 1,393,300.00 1,393,300.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 1.00 312,800.00 312,800.00
3 Floor Drain ex. Toto type TX1BN bh 1.00 432,400.00 432,400.00
4 Tempat tisue ex. Toto AW360 J bh 1.00 538,100.00 538,100.00
5 Tempat sabun ex. Toto S161 bh 1.00 96,900.00 96,900.00
6 Gantungan baju ex. Toto type TX704ACW bh 1.00 359,700.00 359,700.00
7 Bak Mandi fiber lapis keramik unit 1.00 2,003,300.00 2,003,300.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P3 unit 1.00 2,122,700.00 2,122,700.00
Sub jumlah 3.A.2.31 11,060,756.00
32 R. Keluarga dan R. Makan (as 3-4/d-f)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 30.29 343,700.00 10,410,673.00
2 Plint homogeneous tile 10 x 60 cm m1 20.77 41,000.00 851,570.00
3 Urugan pasir t=3cm m3 0.91 265,300.00 241,078.11
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 107.95 40,600.00 4,382,952.70
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 30.29 100,900.00 3,056,261.00
2 List Plafond m1 29.77 26,900.00 800,813.00
3 Cat plafond, acrylic emulsi m2 30.29 40,400.00 1,223,716.00
Saniter - -
1 Pek. Meja beton lapis keramik 30 x 30 cm m2 1.25 624,800.00 781,000.00
2 Kitchen sink unit 1.00 1,002,600.00 1,002,600.00
3 Kran Ex. Toto type. TX609 bh 1.00 284,000.00 284,000.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
1 Jendela type J3 unit 1.00 2,807,200.00 2,807,200.00
2 Pintu type P1 unit 1.00 2,818,000.00 2,818,000.00
2 Pintu type P4 unit 1.00 2,818,000.00 2,818,000.00
Sub jumlah 3.A.2.32 35,576,063.81
33 Balkon (as 3-4/d-f)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 3.61 343,700.00 1,240,757.00
2 Plint homogeneous tile 10 x 60 cm m1 7.60 41,000.00 311,600.00
3 Urugan pasir t=3cm m3 0.11 265,300.00 28,731.99
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 31.29 40,600.00 1,270,475.50
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 3.61 100,900.00 364,249.00
2 List Plafond m1 8.50 26,900.00 228,650.00
3 Cat plafond, acrylic emulsi m2 3.61 40,400.00 145,844.00
Perlengkapan -
1 Railing balkon m1 3.00 650,000.00 1,950,000.00
Sub jumlah 3.A.2.33 5,540,307.49
34 R. Tidur (as 3-4/e-f)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 9.66 343,700.00 3,320,142.00
2 Plint homogeneous tile 10 x 60 cm m1 12.49 41,000.00 512,090.00
3 Urugan pasir t=3cm m3 0.29 265,300.00 76,883.94

EE GD. FLAT DOSEN Page 95


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 46.45 40,600.00 1,885,930.90
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 9.66 100,900.00 974,694.00
2 List Plafond m1 13.39 26,900.00 360,191.00
3 Cat plafond, acrylic emulsi m2 9.66 40,400.00 390,264.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
2 Pintu type P2 unit 1.00 2,833,300.00 2,833,300.00
Sub jumlah 3.A.2.34 14,451,695.84
35 R. Tidur (as 3-4/d-e)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 8.69 343,700.00 2,986,753.00
2 Plint homogeneous tile 10 x 60 cm m1 11.10 41,000.00 455,100.00
3 Urugan pasir t=3cm m3 0.26 265,300.00 69,163.71
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 43.43 40,600.00 1,763,258.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 8.69 100,900.00 876,821.00
2 List Plafond m1 11.10 26,900.00 298,590.00
3 Cat plafond, acrylic emulsi m2 8.69 40,400.00 351,076.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J2 unit 1.00 4,099,200.00 4,099,200.00
2 Pintu type P2 unit 1.00 2,833,300.00 2,833,300.00
Sub jumlah 3.A.2.35 13,733,261.71
36 KM/WC (as 3-4/d-f)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 2.00 166,800.00 333,600.00
2 Waterproofing coating m2 2.00 133,700.00 267,400.00
3 Urugan pasir t=3cm m3 0.06 265,300.00 15,918.00
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 11.46 217,300.00 2,490,258.00
2 Cat dinding, acrylic emulsi m2 4.55 40,600.00 184,730.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 2.00 127,000.00 254,000.00
2 List Plafond m1 6.50 26,900.00 174,850.00
3 Cat plafond, acrylic emulsi m2 2.00 40,400.00 80,800.00
Sanitary - -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 1.00 1,393,300.00 1,393,300.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 1.00 312,800.00 312,800.00
3 Floor Drain ex. Toto type TX1BN bh 1.00 432,400.00 432,400.00
4 Tempat tisue ex. Toto AW360 J bh 1.00 538,100.00 538,100.00
5 Tempat sabun ex. Toto S161 bh 1.00 96,900.00 96,900.00
6 Gantungan baju ex. Toto type TX704ACW bh 1.00 359,700.00 359,700.00
7 Bak Mandi fiber lapis keramik unit 1.00 2,003,300.00 2,003,300.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P3 unit 1.00 2,122,700.00 2,122,700.00
Sub jumlah 3.A.2.36 11,060,756.00
37 R. Keluarga dan R. Makan (as 4-5/d-f)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 30.29 343,700.00 10,410,673.00
2 Plint homogeneous tile 10 x 60 cm m1 20.77 41,000.00 851,570.00
3 Urugan pasir t=3cm m3 0.91 265,300.00 241,078.11
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 107.95 40,600.00 4,382,952.70
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 30.29 100,900.00 3,056,261.00
2 List Plafond m1 29.77 26,900.00 800,813.00
3 Cat plafond, acrylic emulsi m2 30.29 40,400.00 1,223,716.00
Saniter - -
1 Pek. Meja beton lapis keramik 30 x 30 cm m2 1.25 624,800.00 781,000.00
2 Kitchen sink unit 1.00 1,002,600.00 1,002,600.00
3 Kran Ex. Toto type. TX609 bh 1.00 284,000.00 284,000.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
1 Jendela type J3 unit 1.00 2,807,200.00 2,807,200.00
2 Pintu type P1 unit 1.00 2,818,000.00 2,818,000.00
2 Pintu type P4 unit 1.00 2,818,000.00 2,818,000.00

EE GD. FLAT DOSEN Page 96


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

Sub jumlah 3.A.2.37 35,576,063.81


38 Balkon (as 4-5/d-f)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 3.61 343,700.00 1,240,757.00
2 Plint homogeneous tile 10 x 60 cm m1 7.60 41,000.00 311,600.00
3 Urugan pasir t=3cm m3 0.11 265,300.00 28,731.99
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 31.29 40,600.00 1,270,475.50
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 3.61 100,900.00 364,249.00
2 List Plafond m1 8.50 26,900.00 228,650.00
3 Cat plafond, acrylic emulsi m2 3.61 40,400.00 145,844.00
Perlengkapan -
1 Railing balkon m1 3.00 650,000.00 1,950,000.00
Sub jumlah 3.A.2.38 5,540,307.49
39 R. Tidur (as 4-5/e-f)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 9.66 343,700.00 3,320,142.00
2 Plint homogeneous tile 10 x 60 cm m1 12.49 41,000.00 512,090.00
3 Urugan pasir t=3cm m3 0.29 265,300.00 76,883.94
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 41.51 40,600.00 1,685,265.40
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 9.66 100,900.00 974,694.00
2 List Plafond m1 13.39 26,900.00 360,191.00
3 Cat plafond, acrylic emulsi m2 9.66 40,400.00 390,264.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
2 Pintu type P2 unit 1.00 2,833,300.00 2,833,300.00
Sub jumlah 3.A.2.39 14,251,030.34
40 R. Tidur (as 4-5/d-e)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 8.69 343,700.00 2,986,753.00
2 Plint homogeneous tile 10 x 60 cm m1 11.10 41,000.00 455,100.00
3 Urugan pasir t=3cm m3 0.26 265,300.00 69,163.71
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 43.43 40,600.00 1,763,258.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 8.69 100,900.00 876,821.00
2 List Plafond m1 12.00 26,900.00 322,800.00
3 Cat plafond, acrylic emulsi m2 8.69 40,400.00 351,076.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J2 unit 1.00 4,099,200.00 4,099,200.00
2 Pintu type P2 unit 1.00 2,833,300.00 2,833,300.00
Sub jumlah 3.A.2.40 13,757,471.71
41 KM/WC (as 4-5/d-f)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 2.00 166,800.00 333,600.00
2 Waterproofing coating m2 2.00 133,700.00 267,400.00
3 Urugan pasir t=3cm m3 0.06 265,300.00 15,918.00
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 11.46 217,300.00 2,490,258.00
2 Cat dinding, acrylic emulsi m2 4.55 40,600.00 184,730.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 2.00 127,000.00 254,000.00
2 List Plafond m1 6.50 26,900.00 174,850.00
3 Cat plafond, acrylic emulsi m2 2.00 40,400.00 80,800.00
Sanitary - -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 1.00 1,393,300.00 1,393,300.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 1.00 312,800.00 312,800.00
3 Floor Drain ex. Toto type TX1BN bh 1.00 432,400.00 432,400.00
4 Tempat tisue ex. Toto AW360 J bh 1.00 538,100.00 538,100.00
5 Tempat sabun ex. Toto S161 bh 1.00 96,900.00 96,900.00
6 Gantungan baju ex. Toto type TX704ACW bh 1.00 359,700.00 359,700.00
7 Bak Mandi fiber lapis keramik unit 1.00 2,003,300.00 2,003,300.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P3 unit 1.00 2,122,700.00 2,122,700.00
Sub jumlah 3.A.2.41 11,060,756.00

EE GD. FLAT DOSEN Page 97


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

42 R. Keluarga dan R. Makan (as 5-6/d-f)


Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 30.29 343,700.00 10,410,673.00
2 Plint homogeneous tile 10 x 60 cm m1 20.77 41,000.00 851,570.00
3 Urugan pasir t=3cm m3 0.91 265,300.00 241,078.11
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 107.95 40,600.00 4,382,952.70
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 30.29 100,900.00 3,056,261.00
2 List Plafond m1 29.77 26,900.00 800,813.00
3 Cat plafond, acrylic emulsi m2 30.29 40,400.00 1,223,716.00
Saniter - -
1 Pek. Meja beton lapis keramik 30 x 30 cm m2 1.25 624,800.00 781,000.00
2 Kitchen sink unit 1.00 1,002,600.00 1,002,600.00
3 Kran Ex. Toto type. TX609 bh 1.00 284,000.00 284,000.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
1 Jendela type J3 unit 1.00 2,807,200.00 2,807,200.00
2 Pintu type P1 unit 1.00 2,818,000.00 2,818,000.00
2 Pintu type P4 unit 1.00 2,818,000.00 2,818,000.00
Sub jumlah 2.A.2.42 35,576,063.81
43 Balkon (as 5-6/d-f)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 3.61 343,700.00 1,240,757.00
2 Plint homogeneous tile 10 x 60 cm m1 7.60 41,000.00 311,600.00
3 Urugan pasir t=3cm m3 0.11 265,300.00 28,731.99
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 31.29 40,600.00 1,270,475.50
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 3.61 100,900.00 364,249.00
2 List Plafond m1 8.50 26,900.00 228,650.00
3 Cat plafond, acrylic emulsi m2 3.61 40,400.00 145,844.00
Perlengkapan -
1 Railing balkon m1 3.00 650,000.00 1,950,000.00
Sub jumlah 2.A.2.43 5,540,307.49
44 R. Tidur (as 5-6/e-f)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 9.66 343,700.00 3,320,142.00
2 Plint homogeneous tile 10 x 60 cm m1 12.49 41,000.00 512,090.00
3 Urugan pasir t=3cm m3 0.29 265,300.00 76,883.94
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 41.51 40,600.00 1,685,265.40
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 9.66 100,900.00 974,694.00
2 List Plafond m1 13.39 26,900.00 360,191.00
3 Cat plafond, acrylic emulsi m2 9.66 40,400.00 390,264.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
2 Pintu type P2 unit 1.00 2,833,300.00 2,833,300.00
Sub jumlah 2.A.2.44 14,251,030.34
45 R. Tidur (as 5-6/d-e)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 8.69 343,700.00 2,986,753.00
2 Plint homogeneous tile 10 x 60 cm m1 11.10 41,000.00 455,100.00
3 Urugan pasir t=3cm m3 0.26 265,300.00 69,163.71
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 43.43 40,600.00 1,763,258.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 8.69 100,900.00 876,821.00
2 List Plafond m1 12.00 26,900.00 322,800.00
3 Cat plafond, acrylic emulsi m2 8.69 40,400.00 351,076.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J2 unit 1.00 4,099,200.00 4,099,200.00
2 Pintu type P2 unit 1.00 2,833,300.00 2,833,300.00
Sub jumlah 2.A.2.45 13,757,471.71
46 KM/WC (as 5-6/d-f)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 2.00 166,800.00 333,600.00

EE GD. FLAT DOSEN Page 98


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

2 Waterproofing coating m2 2.00 133,700.00 267,400.00


3 Urugan pasir t=3cm m3 0.06 265,300.00 15,918.00
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 11.46 217,300.00 2,490,258.00
2 Cat dinding, acrylic emulsi m2 4.55 40,600.00 184,730.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 2.00 127,000.00 254,000.00
2 List Plafond m1 6.50 26,900.00 174,850.00
3 Cat plafond, acrylic emulsi m2 2.00 40,400.00 80,800.00
Sanitary - -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 1.00 1,393,300.00 1,393,300.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 1.00 312,800.00 312,800.00
3 Floor Drain ex. Toto type TX1BN bh 1.00 432,400.00 432,400.00
4 Tempat tisue ex. Toto AW360 J bh 1.00 538,100.00 538,100.00
5 Tempat sabun ex. Toto S161 bh 1.00 96,900.00 96,900.00
6 Gantungan baju ex. Toto type TX704ACW bh 1.00 359,700.00 359,700.00
7 Bak Mandi fiber lapis keramik unit 1.00 2,003,300.00 2,003,300.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P3 unit 1.00 2,122,700.00 2,122,700.00
Sub jumlah 2.A.2.46 11,060,756.00
47 Area Tangga (as 1-2/a-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile uk. 30 x 30 cm polished (bordes+anak tangga) m2 37.10 378,900.00 14,057,190.00
2 Pasangan lantai keramik step nozing 10 x 30 m1 62.20 65,700.00 4,086,540.00
Pekerjaan Dinding - -
1 Plint homogeneous tile 10 x 30 cm m1 46.10 41,900.00 1,931,590.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 30.00 100,900.00 3,027,000.00
2 List Plafond m1 22.00 26,900.00 591,800.00
3 Cat plafond+tangga, acrylic emulsi m2 60.00 40,400.00 2,424,000.00
Railling - -
1 Pekerjaan railing pipa BSP kombinasi besi tempa fin. Cat Duco m1 21.56 755,000.00 16,277,800.00
2 Pekerjaan hand railing pipa BSP fin. Cat Duco m1 16.56 465,500.00 7,708,680.00
Pekerjaan Pintu dan jendela 284,000.00 -
1 Jendela type J1 unit 2.00 4,098,200.00 8,196,400.00
Sub jumlah 2.A.2.47 58,301,000.00
Jumlah 3.A.2 887,553,268.32
Jumlah 3.A 1,248,976,456.81
B FINISHING EXTERIOR -
1 Cat dinding, kolom, balok struktur luar weathershield, acrylic emulsi m2 221.19 40,200.00 8,891,838.00
Sub jumlah 3.B.1 8,891,838.00
Jumlah 3.B 8,891,838.00
IV LANTAI DAK ATAP
A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding
1 Pasangan dinding bata merah ukuran tebal ½ bata, campuran spesi 1 Pc : 4 Ps m2 221.19 112,900.00 24,972,351.00
2 Pek. Plesteran m2 424.05 46,100.00 19,548,705.00
3 Pek. Acian m2 424.05 20,900.00 8,862,645.00
4 Kolom praktis + ring balok ukuran 12 x 12 Cm m3 0.73 9,370,200.00 6,800,516.35
Jumlah 4.A.1 60,184,217.35
2 Pekerjaan Finishing
1 Lantai dak atap (as 1-6/a-f)
Pekerjaan Lantai
1 screeding + waterproofing membran m2 879.74 168,500.00 148,235,347.50
Sub jumlah 4.A.2.1 148,235,347.50
2 R. Cuci (as 3-4/b-c)
Pekerjaan Dinding -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 9.48 217,300.00 2,060,004.00
2 Cat dinding, acrylic emulsi m2 9.48 40,600.00 384,888.00
Pekerjaan Penutup atap -
1 Penutup atap polycarbonate rangka hollow galvalum fin. Cat m2 33.35 780,000.00 26,012,610.00
Sanitary -
1 Kran Ex. Toto type. TX609 bh 10.00 170,500.00 1,705,000.00
2 Floor Drain ex. Toto type TX1BN bh 4.00 432,400.00 1,729,600.00
Sub jumlah 4.A.2.2 31,892,102.00
3 R. Jemur (as 4-6/a-d)
Pekerjaan Dinding -
1 Cat dinding, acrylic emulsi m2 31.68 40,600.00 1,286,208.00

EE GD. FLAT DOSEN Page 99


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

Pekerjaan Penutup atap -


1 Penutup atap polycarbonate rangka hollow galvalum fin. Cat m2 43.09 780,000.00 33,608,250.00
Sub jumlah 4.A.2.3 34,894,458.00
4 Area Tangga (as 1-2/a-c)
Pekerjaan Dinding
1 Cat dinding, acrylic emulsi m2 60.00 40,600.00 2,436,000.00
Pekerjaan Plafond -
3 Cat plafond beton expose, acrylic emulsi m2 60.00 40,400.00 2,424,000.00
Pekerjaan Dak Beton -
1 Waterprofing coating m2 68.06 133,700.00 9,099,956.25
Pekerjaan Pintu dan jendela -
1 Pintu type P8 unit 1.00 10,960,900.00 10,960,900.00
Sub jumlah 4.A.2.4 24,920,856.25
Jumlah 4.A.2 239,942,763.75
Jumlah 4.A 300,126,981.10
B FINISHING EXTERIOR
1 Cat dinding, kolom, balok struktur luar weathershield, acrylic emulsi m2 172.08 40,200.00 6,917,616.00
2 Sign Name Stainless steel plate lot 1.00 15,000,000.00 15,000,000.00
Sub jumlah 4.B.1 21,917,616.00
Jumlah 4.B 21,917,616.00

EE GD. FLAT DOSEN Page 100


REKAPITULASI

ENGINEERING ESTIMATE

(EE)

Pekerjaan : Pembangunan Politeknik KP Pangandaran


Lokasi : Pangandaran - Jawa Barat
Thn Anggaran : 2018

JUMLAH HARGA
NO. JENIS PEKERJAAN (Rp.)

GEDUNG ASRAMA PUTRA


ARSITEKTUR
1 LANTAI DASAR
A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding 117,944,617.53
2 Pekerjaan Finishing 630,283,070.76
B FINISHING EXTERIOR 7,397,181.90

2 LANTAI SATU
A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding 330,434,434.74
2 Pekerjaan Finishing 760,345,912.05
B FINISHING EXTERIOR 11,031,402.60

3 LANTAI DUA
A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding 330,434,434.74
2 Pekerjaan Finishing 738,358,554.78
B FINISHING EXTERIOR 11,031,402.60

4 LANTAI DAK ATAP


A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding 56,486,228.26
2 Pekerjaan Finishing 243,202,393.30
B FINISHING EXTERIOR 22,732,148.40

JUMLAH 3,259,681,781.65
ENGINEERING ESTIMATE

(EE)

Pekerjaan : Pembangunan Politeknik KP Pangandaran


Lokasi : Pangandaran - Jawa Barat
Thn Anggaran : 2018

HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

GEDUNG ASRAMA PUTRA


1 LANTAI DASAR
A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding
1 Pasangan dinding bata merah ukuran tebal ½ bata, campuran spesi 1 Pc : 4 Ps m2 295.76 112,900.00 33,391,772.54
2 Pek. Plesteran m2 591.53 46,100.00 27,269,454.63
3 Pek. Acian m2 591.53 20,900.00 12,362,941.47
4 Pek. Rooster beton m2 56.00 303,500.00 16,996,000.00
5 Plesteran + acian kolom, balok, dinding, lisplank beton struktur m2 76.03 67,000.00 5,094,144.00
6 Kolom praktis + ring balok ukuran 12 x 12 Cm m3 2.44 9,370,200.00 22,830,304.90
Sub Jumlah 1.A.1 117,944,617.53
2 Pekerjaan Finishing
1 Lantai dasar dan r. Makan (as 1-12/a-d)
Pekerjaan Lantai
1 Plat lantai t=15cm, k-250 m3 69.70 3,475,800.00 242,271,515.03
2 Pasangan Floor hardener m2 464.68 89,400.00 41,542,615.50
Pekerjaan Dinding -
1 Cat dinding dan Kolom, acrylic emulsi m2 268.77 40,600.00 10,912,062.00
Pekerjaan Plafond -
1 Plafond gypsum 9 mm, rangka metal furing m2 464.68 100,900.00 46,886,464.25
2 List Plafond m1 111.55 26,900.00 3,000,695.00
3 Cat plafond, acrylic emulsi m2 464.68 40,400.00 18,773,173.00
Sanitary -
1 Wastafel ex. Toto type LW 640 + kran TX 115 LESN bh 2.00 2,402,400.00 4,804,800.00
2 Tempat sabun ex. Toto S161 bh 2.00 96,900.00 193,800.00
3 Meja beton lapis granit m2 12.21 822,100.00 10,037,841.00
4 Kaca cermin t= 6 mm, multiplek 9 mm,List stainless steel m2 2.25 350,000.00 787,500.00
5 Kran Ex. Toto type. TX609 bh 16.00 284,000.00 4,544,000.00
Sub Jumlah 1.A.2.1 383,754,465.78
2 R. Chef (as 3-4/c-d)
Pekerjaan Lantai
1 Plat lantai t=15cm, k-250 m3 0.50 3,475,800.00 1,746,589.50
2 Pasangan Floor hardener m2 3.35 89,400.00 299,490.00
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 25.94 40,600.00 1,053,164.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 3.35 100,900.00 338,015.00
2 List Plafond m1 7.80 26,900.00 209,820.00
3 Cat plafond, acrylic emulsi m2 3.35 40,400.00 135,340.00
Pekerjaan Pintu dan jendela -
1 Pintu type P4 unit 1.00 2,258,200.00 2,258,200.00
Sub Jumlah 1.A.2.2 6,040,618.50
3 Gudang Makanan Beku (as 3-4/c-d)
Pekerjaan Lantai
1 Plat lantai t=15cm, k-250 m3 0.84 3,475,800.00 2,932,706.25
2 Pasangan Floor hardener m2 5.63 89,400.00 502,875.00
Pekerjaan Dinding -
1 Cat dinding, acrylic emulsi m2 34.20 40,600.00 1,388,520.00
Pekerjaan Plafond -
1 Plafond gypsum 9 mm, rangka metal furing m2 5.63 100,900.00 567,562.50
2 List Plafond m1 9.50 26,900.00 255,550.00
3 Cat plafond, acrylic emulsi m2 5.63 40,400.00 227,250.00
Pekerjaan Pintu dan jendela -
1 Pintu type P4 unit 1.00 2,258,200.00 2,258,200.00
Sub Jumlah 1.A.2.3 8,132,663.75
4 Gudang Makanan (as 4-5/c-d)
Pekerjaan Lantai
1 Plat lantai t=15cm, k-250 m3 0.81 3,475,800.00 2,815,398.00
2 Pasangan Floor hardener m2 5.40 89,400.00 482,760.00
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 41.04 40,600.00 1,666,224.00

EE GD. ASM PUTRA Page 102


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 5.40 100,900.00 544,860.00
2 List Plafond m1 11.40 26,900.00 306,660.00
3 Cat plafond, acrylic emulsi m2 5.40 40,400.00 218,160.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P4 unit 1.00 2,258,200.00 2,258,200.00
Sub Jumlah 1.A.2.4 8,292,262.00
5 T. Cuci Alat (as 4-5/c-d)
Pekerjaan Lantai
1 Plat lantai t=15cm, k-250 m3 0.84 3,475,800.00 2,932,706.25
2 Pasangan Floor hardener m2 5.63 89,400.00 502,875.00
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 34.20 40,600.00 1,388,520.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 5.63 100,900.00 567,562.50
2 List Plafond m1 9.50 26,900.00 255,550.00
3 Cat plafond, acrylic emulsi m2 5.63 40,400.00 227,250.00
Sanitary -
1 Meja beton lapis granit m2 3.85 822,100.00 3,165,085.00
Sub Jumlah 1.A.2.5 9,039,548.75
6 T. Cuci Piring (as 4-5/c-d)
Pekerjaan Lantai
1 Plat lantai t=15cm, k-250 m3 0.84 3,475,800.00 2,932,706.25
2 Pasangan Floor hardener m2 5.63 89,400.00 502,875.00
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 34.20 40,600.00 1,388,520.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 5.63 100,900.00 567,562.50
2 List Plafond m1 9.50 26,900.00 255,550.00
3 Cat plafond, acrylic emulsi m2 5.63 40,400.00 227,250.00
Sanitary - -
1 Meja beton lapis granit m2 3.85 822,100.00 3,165,085.00
Sub Jumlah 1.A.2.6 9,039,548.75
7 Selasar Gudang (as 3-5/c-d)
Pekerjaan Lantai
1 Plat lantai t=15cm, k-250 m3 3.04 3,475,800.00 10,557,742.50
2 Pasangan Floor hardener m2 20.25 89,400.00 1,810,350.00
Pekerjaan Dinding -
1 Cat dinding, acrylic emulsi m2 120.60 40,600.00 4,896,360.00
Pekerjaan Plafond -
1 Plafond gypsum 9 mm, rangka metal furing m2 20.25 100,900.00 2,043,225.00
2 List Plafond m1 33.50 26,900.00 901,150.00
3 Cat plafond, acrylic emulsi m2 20.25 40,400.00 818,100.00
Pekerjaan Pintu dan jendela -
1 Pintu type P2 unit 2.00 4,872,300.00 9,744,600.00
Sub Jumlah 1.A.2.7 30,771,527.50
8 Area Masak dan tempat saji (as 5-8/c-d)
Pekerjaan Lantai
1 Plat lantai t=15cm, k-250 m3 10.73 3,475,800.00 37,304,023.50
2 Pasangan Floor hardener m2 71.55 89,400.00 6,396,570.00
Pekerjaan Dinding -
1 Cat dinding, acrylic emulsi m2 118.98 40,600.00 4,830,588.00
Pekerjaan Plafond -
1 Plafond gypsum 9 mm, rangka metal furing m2 71.55 100,900.00 7,219,395.00
2 List Plafond m1 36.30 26,900.00 976,470.00
3 Cat plafond, acrylic emulsi m2 71.55 40,400.00 2,890,620.00
Sanitary - -
1 Meja beton lapis granit m2 13.80 822,100.00 11,344,980.00
Perlengkapan - -
1 Grill alumunium m1 8.35 450,000.00 3,757,500.00
Sub Jumlah 1.A.2.8 74,720,146.50
9 R. Chef (as 3-4/c-d)
Pekerjaan Lantai
1 Plat lantai t=15cm, k-250 m3 0.50 3,475,800.00 1,746,589.50
2 Pasangan Floor hardener m2 3.35 89,400.00 299,490.00
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 25.94 40,600.00 1,053,164.00
Pekerjaan Plafond - -

EE GD. ASM PUTRA Page 103


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

1 Plafond gypsum 9 mm, rangka metal furing m2 3.35 100,900.00 338,015.00


2 List Plafond m1 7.80 26,900.00 209,820.00
3 Cat plafond, acrylic emulsi m2 3.35 40,400.00 135,340.00
Pekerjaan Pintu dan jendela -
1 Pintu type P4 unit 1.00 2,258,200.00 2,258,200.00
Sub Jumlah 1.A.2.9 6,040,618.50
10 Gudang (as 2-3/c-d)
Pekerjaan Lantai
1 Plat lantai t=15cm, k-250 m3 1.96 3,475,800.00 6,809,092.20
2 Pasangan Floor hardener m2 13.06 89,400.00 1,167,564.00
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 50.28 40,600.00 2,041,165.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 13.06 100,900.00 1,317,754.00
2 List Plafond m1 15.65 26,900.00 420,985.00
3 Cat plafond, acrylic emulsi m2 13.06 40,400.00 527,624.00
Pekerjaan Pintu dan jendela -
1 Pintu type P4 unit 1.00 2,258,200.00 2,258,200.00
Sub Jumlah 1.A.2.10 14,542,384.20
11 KM/WC (as 2-3/c-d)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 4.20 166,800.00 700,560.00
Pekerjaan Dinding -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 26.00 217,300.00 5,649,800.00
1 Cat dinding, acrylic emulsi m2 11.90 40,600.00 483,140.00
Pekerjaan Plafond -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 4.20 127,000.00 533,400.00
2 List Plafond m1 17.00 26,900.00 457,300.00
3 Cat plafond, acrylic emulsi m2 4.20 40,400.00 169,680.00
Sanitary -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 4.00 1,393,300.00 5,573,200.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 4.00 312,800.00 1,251,200.00
3 Floor Drain ex. Toto type TX1BN bh 4.00 432,400.00 1,729,600.00
4 Tempat tisue ex. Toto AW360 J bh 4.00 538,100.00 2,152,400.00
5 Gantungan baju ex. Toto type TX704ACW bh 4.00 359,700.00 1,438,800.00
Pekerjaan Pintu dan jendela -
1 Pintu type P5 unit 4.00 2,115,200.00 8,460,800.00
Sub Jumlah 1.A.2.11 28,599,880.00
12 Area Tangga (as 1-2/a-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile uk. 30 x 30 cm polished (bordes+anak tangga) m2 24.31 378,900.00 9,212,517.77
2 Pasangan lantai keramik step nozing 10 x 30 m1 41.73 65,700.00 2,741,332.50
Pekerjaan Dinding -
1 Plint homogeneous tile 10 x 30 cm m1 17.08 41,900.00 715,652.00
Pekerjaan Plafond -
1 Cat plafond, acrylic emulsi m2 17.34 40,400.00 700,536.00
Railling -
1 Pekerjaan railing pipa BSP kombinasi besi tempa fin. Cat Duco m1 8.34 755,000.00 6,293,680.00
2 Pekerjaan hand railing pipa BSP fin. Cat Duco m1 12.87 465,500.00 5,990,985.00
Sub Jumlah 1.A.2.12 25,654,703.27
13 Area Tangga (as 11-12/a-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile uk. 30 x 30 cm polished (bordes+anak tangga) m2 24.31 378,900.00 9,212,517.77
2 Pasangan lantai keramik step nozing 10 x 30 m1 41.73 65,700.00 2,741,332.50
Pekerjaan Dinding -
2 Plint homogeneous tile 10 x 30 cm m1 17.08 41,900.00 715,652.00
Pekerjaan Plafond -
1 Cat plafond, acrylic emulsi m2 17.34 40,400.00 700,536.00
Railling -
1 Pekerjaan railing stainless steel m1 8.34 755,000.00 6,293,680.00
2 Pekerjaan hand railing stainless steel m1 12.87 465,500.00 5,990,985.00
Sub Jumlah 1.A.2.13 25,654,703.27
Jumlah 1.A.2 630,283,070.76
Jumlah 1.A 748,227,688.29
B FINISHING EXTERIOR
1 Cat dinding, kolom, balok struktur luar weathershield, acrylic emulsi m2 184.01 40,200.00 7,397,181.90
Sub jumlah 1.B.1 7,397,181.90
Jumlah 1.B 7,397,181.90

EE GD. ASM PUTRA Page 104


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

2 LANTAI SATU
A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding
1 Pasangan dinding bata merah ukuran tebal ½ bata, campuran spesi 1 Pc : 4 Ps m2 1,088.17 112,900.00 122,854,460.74
2 Pek. Plesteran m2 2,176.34 46,100.00 100,329,329.32
3 Pek. Acian m1 2,176.34 20,900.00 45,485,531.08
4 Plesteran + acian kolom, balok, dinding, lisplank beton struktur m2 76.03 67,000.00 5,094,144.00
5 Kolom praktis + ring balok ukuran 12 x 12 Cm m3 6.05 9,370,200.00 56,670,969.60
Sub Jumlah 2.A.1 330,434,434.74
2 Pekerjaan Finishing
1 Koridor (as 2-11/b-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 81.99 343,700.00 28,179,963.00
2 Plint homogeneous tile 10 x 60 cm m1 87.26 41,000.00 3,577,660.00
3 Urugan pasir t=3cm m3 2.46 265,300.00 652,558.41
Pekerjaan Dinding -
1 Cat dinding, acrylic emulsi m2 235.60 40,600.00 9,565,441.20
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 81.99 100,900.00 8,272,791.00
2 List Plafond m1 87.26 26,900.00 2,347,294.00
3 Cat plafond, acrylic emulsi m2 81.99 40,400.00 3,312,396.00
Pekerjaan Pintu dan jendela -
1 Jendela type J2 unit 2.00 750,400.00 1,500,800.00
2 Pintu type P6 unit 4.00 3,612,900.00 14,451,600.00
3 Pintu type P7 unit 2.00 3,119,600.00 6,239,200.00
Sub jumlah 2.A.2.1 78,099,703.61
2 Shower (as 2-3/a-b)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 6.50 166,800.00 1,084,200.00
2 Waterproofing coating m2 6.50 133,700.00 869,050.00
3 Urugan pasir t=3cm m3 0.20 265,300.00 51,733.50
Pekerjaan Dinding -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 37.65 217,300.00 8,181,345.00
1 Cat dinding, acrylic emulsi m2 15.75 40,600.00 639,450.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 6.50 127,000.00 825,500.00
2 List Plafond m1 22.50 26,900.00 605,250.00
3 Cat plafond, acrylic emulsi m2 6.50 40,400.00 262,600.00
Sanitary -
1 Shower TOTO TX 492 SG bh 5.00 954,800.00 4,774,000.00
2 Floor Drain ex. Toto type TX1BN bh 5.00 432,400.00 2,162,000.00
3 Tempat sabun ex. Toto S161 bh 5.00 96,900.00 484,500.00
4 Gantungan baju ex. Toto type TX704ACW bh 5.00 359,700.00 1,798,500.00
Pekerjaan Pintu dan jendela -
1 Jendela type J3 unit 1.00 329,700.00 329,700.00
2 Pintu type P5 unit 5.00 2,115,200.00 10,576,000.00
3 Pintu type P6 unit 1.00 3,612,900.00 3,612,900.00
Sub jumlah 2.A.2.2 36,256,728.50
3 Selasar Shower (as 2-3/a-b)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 20 x 20 cm unpolished m2 5.81 166,800.00 969,108.00
2 Waterproofing coating m2 5.81 133,700.00 776,797.00
3 Urugan pasir t=3cm m3 0.17 265,300.00 46,241.79
Pekerjaan Dinding -
1 Cat dinding, acrylic emulsi m2 24.50 40,600.00 994,497.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 5.81 127,000.00 737,870.00
2 List Plafond m1 11.95 26,900.00 321,455.00
3 Cat plafond, acrylic emulsi m2 5.81 40,400.00 234,724.00
Pekerjaan Pintu dan jendela -
1 Jendela type J3 unit 1.00 329,700.00 329,700.00
2 Pintu type P3 unit 1.00 2,807,100.00 2,807,100.00
Sub jumlah 2.A.2.3 7,217,492.79
4 R. Panel (as 3-4/a-b)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 4.71 343,700.00 1,618,827.00
2 Plint homogeneous tile 10 x 60 cm m1 8.40 41,000.00 344,400.00
3 Urugan pasir t=3cm m3 0.14 265,300.00 37,486.89

EE GD. ASM PUTRA Page 105


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 27.87 40,600.00 1,131,522.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 4.71 100,900.00 475,239.00
2 List Plafond m1 9.30 26,900.00 250,170.00
3 Cat plafond, acrylic emulsi m2 4.71 40,400.00 190,284.00
Pekerjaan Pintu dan jendela -
1 Pintu type P3 unit 1.00 2,807,100.00 2,807,100.00
Sub jumlah 2.A.2.4 6,855,028.89
5 R. Tidur Pembina (as 3-4/a-b)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 12.31 343,700.00 4,230,947.00
2 Plint homogeneous tile 10 x 60 cm m1 14.55 41,000.00 596,550.00
3 Urugan pasir t=3cm m3 0.37 265,300.00 97,975.29
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 37.28 40,600.00 1,513,669.50
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 12.31 100,900.00 1,242,079.00
2 List Plafond m1 16.15 26,900.00 434,435.00
3 Cat plafond, acrylic emulsi m2 12.31 40,400.00 497,324.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
2 Pintu type P1 unit 1.00 2,828,800.00 2,828,800.00
Sub jumlah 2.A.2.5 15,539,979.79
6 KM/WC (as 3-4/a-b)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 4.36 166,800.00 727,248.00
2 Waterproofing coating m2 4.36 133,700.00 582,932.00
3 Urugan pasir t=3cm m3 0.13 265,300.00 34,701.24
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 17.90 217,300.00 3,889,670.00
1 Cat dinding, acrylic emulsi m2 6.27 40,600.00 254,359.00
Pekerjaan Plafond -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 4.36 127,000.00 553,720.00
2 List Plafond m1 8.95 26,900.00 240,755.00
3 Cat plafond, acrylic emulsi m2 4.36 40,400.00 176,144.00
Sanitary -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 1.00 1,393,300.00 1,393,300.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 1.00 312,800.00 312,800.00
3 Wastafel ex. Toto type LW 640 + kran TX 115 LESN bh 1.00 2,402,400.00 2,402,400.00
4 Shower TOTO TX 492 SG bh 1.00 954,800.00 954,800.00
5 Floor Drain ex. Toto type TX1BN bh 1.00 432,400.00 432,400.00
6 Tempat tisue ex. Toto AW360 J bh 1.00 538,100.00 538,100.00
7 Tempat sabun ex. Toto S161 bh 1.00 96,900.00 96,900.00
8 Gantungan baju ex. Toto type TX704ACW bh 1.00 359,700.00 359,700.00
9 Meja wastafel rangka baja fin. Granit m1 0.80 822,100.00 657,680.00
10 Kaca cermin t= 6 mm, multiplek 9 mm,List stainless steel m2 1.13 350,000.00 393,750.00
11 Bak Mandi fiber lapis keramik unit 1.00 2,003,300.00 2,003,300.00
Pekerjaan Pintu dan jendela -
1 Jendela type J3 unit 1.00 329,700.00 329,700.00
2 Pintu type P5 unit 1.00 2,115,200.00 2,115,200.00
Sub jumlah 2.A.2.6 18,449,559.24
7 R. Tidur Asrama (as 4-6/a-b)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 45.70 343,700.00 15,707,090.00
2 Plint homogeneous tile 10 x 60 cm m1 27.30 41,000.00 1,119,300.00
3 Urugan pasir t=3cm m3 1.37 265,300.00 363,726.30
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 62.94 40,600.00 2,555,364.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 45.70 100,900.00 4,611,130.00
2 List Plafond m1 29.10 26,900.00 782,790.00
3 Cat plafond, acrylic emulsi m2 45.70 40,400.00 1,846,280.00
Pekerjaan Pintu dan jendela -
1 Jendela type J1 unit 4.00 4,098,200.00 16,392,800.00
2 Pintu type P1 unit 2.00 2,828,800.00 5,657,600.00
Sub jumlah 2.A.2.7 49,036,080.30
8 R. Bersama (as 6-7/a-b)

EE GD. ASM PUTRA Page 106


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 21.10 343,700.00 7,252,070.00
2 Plint homogeneous tile 10 x 60 cm m1 16.35 41,000.00 670,350.00
3 Urugan pasir t=3cm m3 0.63 265,300.00 167,934.90
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 32.30 40,600.00 1,311,177.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 21.10 100,900.00 2,128,990.00
2 List Plafond m1 19.50 26,900.00 524,550.00
3 Cat plafond, acrylic emulsi m2 21.10 40,400.00 852,440.00
Pekerjaan Pintu dan jendela -
1 Jendela type J1 unit 4.00 4,098,200.00 16,392,800.00
2 Pintu type P6 unit 2.00 3,612,900.00 7,225,800.00
Sub jumlah 2.A.2.8 36,526,111.90
9 R. Tidur Asrama (as 7-9/a-b)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 45.70 343,700.00 15,707,090.00
2 Plint homogeneous tile 10 x 60 cm m1 27.30 41,000.00 1,119,300.00
3 Urugan pasir t=3cm m3 1.37 265,300.00 363,726.30
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 62.76 40,600.00 2,548,056.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 45.70 100,900.00 4,611,130.00
2 List Plafond m1 29.10 26,900.00 782,790.00
3 Cat plafond, acrylic emulsi m2 45.70 40,400.00 1,846,280.00
Pekerjaan Pintu dan jendela -
1 Jendela type J1 unit 4.00 4,098,200.00 16,392,800.00
2 Pintu type P1 unit 2.00 2,828,800.00 5,657,600.00
Sub jumlah 2.A.2.9 49,028,772.30
10 R. Tidur Pembina (as 9-10/a-b)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 12.31 343,700.00 4,230,947.00
2 Plint homogeneous tile 10 x 60 cm m1 14.55 41,000.00 596,550.00
3 Urugan pasir t=3cm m3 1.37 265,300.00 363,726.30
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 37.28 40,600.00 1,513,669.50
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 12.31 100,900.00 1,242,079.00
2 List Plafond m1 16.15 26,900.00 434,435.00
3 Cat plafond, acrylic emulsi m2 12.31 40,400.00 497,324.00
Pekerjaan Pintu dan jendela -
1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
2 Pintu type P1 unit 1.00 2,828,800.00 2,828,800.00
Sub jumlah 2.A.2.10 15,805,730.80
11 R. Peralatan (as 9-10/a-b)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 4.71 343,700.00 1,618,827.00
2 Plint homogeneous tile 10 x 60 cm m1 8.40 41,000.00 344,400.00
3 Urugan pasir t=3cm m3 0.14 265,300.00 37,486.89
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 23.13 40,600.00 939,078.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 4.71 100,900.00 475,239.00
2 List Plafond m1 9.30 26,900.00 250,170.00
3 Cat plafond, acrylic emulsi m2 4.71 40,400.00 190,284.00
Pekerjaan Pintu dan jendela -
1 Pintu type P3 unit 1.00 2,807,100.00 2,807,100.00
Sub jumlah 2.A.2.11 6,662,584.89
12 KM/WC (as 9-10/a-b)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 4.36 166,800.00 727,248.00
2 Waterproofing coating m2 4.36 133,700.00 582,932.00
3 Urugan pasir t=3cm m3 0.13 265,300.00 34,701.24
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 16.36 217,300.00 3,555,028.00
2 Cat dinding, acrylic emulsi m2 6.27 40,600.00 254,359.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 4.36 127,000.00 553,720.00

EE GD. ASM PUTRA Page 107


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

2 List Plafond m1 8.95 26,900.00 240,755.00


3 Cat plafond, acrylic emulsi m2 4.36 40,400.00 176,144.00
Sanitary - -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 1.00 1,393,300.00 1,393,300.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 1.00 312,800.00 312,800.00
3 Wastafel ex. Toto type LW 640 + kran TX 115 LESN bh 1.00 2,402,400.00 2,402,400.00
4 Shower TOTO TX 492 SG bh 1.00 954,800.00 954,800.00
5 Floor Drain ex. Toto type TX1BN bh 1.00 432,400.00 432,400.00
6 Tempat tisue ex. Toto AW360 J bh 1.00 538,100.00 538,100.00
7 Tempat sabun ex. Toto S161 bh 1.00 96,900.00 96,900.00
8 Gantungan baju ex. Toto type TX704ACW bh 1.00 359,700.00 359,700.00
9 Meja wastafel rangka baja fin. Granit m1 0.80 822,100.00 657,680.00
10 Kaca cermin t= 6 mm, multiplek 9 mm,List stainless steel m2 1.13 350,000.00 393,750.00
11 Bak Mandi fiber lapis keramik unit 1.00 2,003,300.00 2,003,300.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J3 unit 1.00 329,700.00 329,700.00
2 Pintu type P5 unit 1.00 2,115,200.00 2,115,200.00
Sub jumlah 2.A.2.12 18,114,917.24
13 Shower (as 10-11/a-b)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 6.50 166,800.00 1,084,200.00
2 Waterproofing coating m2 6.50 133,700.00 869,050.00
3 Urugan pasir t=3cm m3 0.20 265,300.00 51,733.50
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 37.65 217,300.00 8,181,345.00
2 Cat dinding, acrylic emulsi m2 15.75 40,600.00 639,450.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 6.50 127,000.00 825,500.00
2 List Plafond m1 22.50 26,900.00 605,250.00
3 Cat plafond, acrylic emulsi m2 6.50 40,400.00 262,600.00
Sanitary -
1 Shower TOTO TX 492 SG bh 5.00 954,800.00 4,774,000.00
2 Floor Drain ex. Toto type TX1BN bh 5.00 432,400.00 2,162,000.00
3 Tempat sabun ex. Toto S161 bh 5.00 96,900.00 484,500.00
4 Gantungan baju ex. Toto type TX704ACW bh 5.00 359,700.00 1,798,500.00
Pekerjaan Pintu dan jendela -
1 Jendela type J3 unit 1.00 329,700.00 329,700.00
2 Pintu type P5 unit 5.00 2,115,200.00 10,576,000.00
3 Pintu type P6 unit 1.00 3,612,900.00 3,612,900.00
Sub jumlah 2.A.2.13 36,256,728.50
14 Selasar Shower (as 10-11/a-b)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 7.31 166,800.00 1,219,408.08
2 Waterproofing coating m2 7.31 133,700.00 977,427.22
3 Urugan pasir t=3cm m3 0.22 265,300.00 58,185.07
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 23.45 217,300.00 5,095,685.00
2 Cat dinding, acrylic emulsi m2 10.93 40,600.00 443,636.20
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 7.31 127,000.00 928,446.20
2 List Plafond m1 15.61 26,900.00 419,909.00
3 Cat plafond, acrylic emulsi m2 7.31 40,400.00 295,348.24
Pekerjaan Pintu dan jendela -
1 Jendela type J3 unit 1.00 329,700.00 329,700.00
2 Pintu type P3 unit 1.00 2,807,100.00 2,807,100.00
Sub jumlah 2.A.2.14 12,574,845.01
15 KM/WC, shower (as 2-4/c-d)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 8.82 166,800.00 1,471,176.00
2 Waterproofing coating m2 8.82 133,700.00 1,179,234.00
3 Urugan pasir t=3cm m3 0.26 265,300.00 70,198.38
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 57.68 217,300.00 12,533,864.00
1 Cat dinding, acrylic emulsi m2 24.50 40,600.00 994,700.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 8.82 127,000.00 1,120,140.00
2 List Plafond m1 35.00 26,900.00 941,500.00
3 Cat plafond, acrylic emulsi m2 8.82 40,400.00 356,328.00

EE GD. ASM PUTRA Page 108


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

Sanitary -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 6.00 1,393,300.00 8,359,800.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 6.00 312,800.00 1,876,800.00
3 Shower TOTO TX 492 SG bh 2.00 954,800.00 1,909,600.00
4 Tempat sabun ex. Toto S161 bh 2.00 96,900.00 193,800.00
5 Floor Drain ex. Toto type TX1BN bh 8.00 432,400.00 3,459,200.00
6 Tempat tisue ex. Toto AW360 J bh 6.00 538,100.00 3,228,600.00
7 Gantungan baju ex. Toto type TX704ACW bh 8.00 359,700.00 2,877,600.00
Pekerjaan Pintu dan jendela -
1 Jendela type J3 unit 2.00 329,700.00 659,400.00
2 Pintu type P5 unit 8.00 2,115,200.00 16,921,600.00
Sub jumlah 2.A.2.15 58,153,540.38
16 Selasar KM/WC, Shower (as 2-4/c-d)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 9.77 166,800.00 1,629,636.00
2 Waterproofing coating m2 9.77 133,700.00 1,306,249.00
3 Urugan pasir t=3cm m3 0.29 265,300.00 77,759.43
Pekerjaan Dinding -
1 Cat dinding, acrylic emulsi m2 23.63 40,600.00 959,175.00
Pekerjaan Plafond -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 9.77 127,000.00 1,240,790.00
2 List Plafond m1 14.35 26,900.00 386,015.00
3 Cat plafond, acrylic emulsi m2 9.77 40,400.00 394,708.00
Sanitary -
1 Wastafel ex. Toto type LW 640 + kran TX 115 LESN bh 1.00 2,402,400.00 2,402,400.00
2 Meja wastafel rangka baja fin. Granit m1 1.08 822,100.00 883,757.50
3 Kaca cermin t= 6 mm, multiplek 9 mm,List stainless steel m2 1.61 350,000.00 564,375.00
Pekerjaan Pintu dan jendela -
1 Jendela type J3 unit 1.00 329,700.00 329,700.00
2 Pintu type P3 unit 1.00 2,807,100.00 2,807,100.00
Sub jumlah 2.A.2.16 12,981,664.93
17 Janitor (as 2-4/c-d)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 1.54 343,700.00 529,298.00
2 Plint homogeneous tile 10 x 60 cm m1 4.20 41,000.00 172,200.00
3 Urugan pasir t=3cm m3 0.05 265,300.00 12,256.86
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 11.88 40,600.00 482,328.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 1.54 100,900.00 155,386.00
2 List Plafond m1 5.10 26,900.00 137,190.00
3 Cat plafond, acrylic emulsi m2 1.54 40,400.00 62,216.00
Pekerjaan Pintu dan jendela -
1 Pintu type P4 unit 1.00 2,258,200.00 2,258,200.00
Sub jumlah 2.A.2.17 3,809,074.86
18 R. Tidur Asrama (as 3-7/c-d)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 68.93 343,700.00 23,691,241.00
2 Plint homogeneous tile 10 x 60 cm m1 35.50 41,000.00 1,455,500.00
3 Urugan pasir t=3cm m3 2.07 265,300.00 548,613.87
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 80.24 40,600.00 3,257,541.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 68.93 100,900.00 6,955,037.00
2 List Plafond m1 39.10 26,900.00 1,051,790.00
3 Cat plafond, acrylic emulsi m2 68.93 40,400.00 2,784,772.00
Pekerjaan Pintu dan jendela -
1 Jendela type J1 unit 6.00 4,098,200.00 24,589,200.00
2 Pintu type P2 unit 2.00 4,872,300.00 9,744,600.00
Sub jumlah 2.A.2.18 74,078,294.87
19 R. Tidur Asrama (as 6-10/c-d)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 68.93 343,700.00 23,691,241.00
2 Plint homogeneous tile 10 x 60 cm m1 35.50 41,000.00 1,455,500.00
3 Urugan pasir t=3cm m3 2.07 265,300.00 548,613.87
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 80.24 40,600.00 3,257,541.00
Pekerjaan Plafond - -

EE GD. ASM PUTRA Page 109


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

1 Plafond gypsum 9 mm, rangka metal furing m2 68.93 100,900.00 6,955,037.00


2 List Plafond m1 39.10 26,900.00 1,051,790.00
3 Cat plafond, acrylic emulsi m2 68.93 40,400.00 2,784,772.00
Pekerjaan Pintu dan jendela -
1 Jendela type J1 unit 6.00 4,098,200.00 24,589,200.00
2 Pintu type P2 unit 2.00 4,872,300.00 9,744,600.00
Sub jumlah 2.A.2.19 74,078,294.87
20 KM/WC, shower (as 9-11/c-d)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 8.82 166,800.00 1,471,176.00
2 Waterproofing coating m2 8.82 133,700.00 1,179,234.00
3 Urugan pasir t=3cm m3 0.26 265,300.00 70,198.38
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 57.68 217,300.00 12,533,864.00
1 Cat dinding, acrylic emulsi m2 24.50 40,600.00 994,700.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 8.82 127,000.00 1,120,140.00
2 List Plafond m1 35.00 26,900.00 941,500.00
3 Cat plafond, acrylic emulsi m2 8.82 40,400.00 356,328.00
Sanitary - -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 6.00 1,393,300.00 8,359,800.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 6.00 312,800.00 1,876,800.00
3 Shower TOTO TX 492 SG bh 2.00 954,800.00 1,909,600.00
4 Tempat sabun ex. Toto S161 bh 2.00 96,900.00 193,800.00
5 Floor Drain ex. Toto type TX1BN bh 8.00 432,400.00 3,459,200.00
6 Tempat tisue ex. Toto AW360 J bh 6.00 538,100.00 3,228,600.00
7 Gantungan baju ex. Toto type TX704ACW bh 8.00 359,700.00 2,877,600.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J3 unit 2.00 329,700.00 659,400.00
2 Pintu type P5 unit 8.00 2,115,200.00 16,921,600.00
Sub jumlah 2.A.2.20 58,153,540.38
21 Selasar KM/WC, Shower (as 9-10/c-d)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 9.77 166,800.00 1,629,636.00
2 Waterproofing coating m2 9.77 133,700.00 1,306,249.00
3 Urugan pasir t=3cm m3 0.29 265,300.00 77,759.43
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 23.63 40,600.00 959,175.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 9.77 127,000.00 1,240,790.00
2 List Plafond m1 14.35 26,900.00 386,015.00
3 Cat plafond, acrylic emulsi m2 9.77 40,400.00 394,708.00
Sanitary - -
1 Wastafel ex. Toto type LW 640 + kran TX 115 LESN bh 1.00 2,402,400.00 2,402,400.00
2 Meja wastafel rangka baja fin. Granit m1 1.08 822,100.00 883,757.50
3 Kaca cermin t= 6 mm, multiplek 9 mm,List stainless steel m2 1.61 350,000.00 564,375.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J3 unit 1.00 329,700.00 329,700.00
2 Pintu type P3 unit 1.00 2,807,100.00 2,807,100.00
Sub jumlah 2.A.2.21 12,981,664.93
22 Janitor (as 6-10/c-d)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 1.54 343,700.00 529,298.00
2 Plint homogeneous tile 10 x 60 cm m1 4.20 41,000.00 172,200.00
3 Urugan pasir t=3cm m3 0.05 265,300.00 12,256.86
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 11.88 40,600.00 482,328.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 1.54 100,900.00 155,386.00
2 List Plafond m1 5.10 26,900.00 137,190.00
3 Cat plafond, acrylic emulsi m2 1.54 40,400.00 62,216.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P4 unit 1.00 2,258,200.00 2,258,200.00
Sub jumlah 2.A.2.22 3,809,074.86
23 Area Tangga (as 1-2/a-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished area lantai dasar m2 22.16 343,700.00 7,616,392.00
2 Pasangan lantai homogeneous tile uk. 30 x 30 cm polished (bordes+anak tangga) m2 24.31 378,900.00 9,212,517.77

EE GD. ASM PUTRA Page 110


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

3 Pasangan lantai keramik step nozing 10 x 30 m1 41.73 65,700.00 2,741,332.50


4 Urugan pasir t=3cm m3 0.66 265,300.00 176,371.44
Pekerjaan Dinding -
1 Cat dinding, acrylic emulsi m2 60.86 40,600.00 2,471,078.40
2 Plint homogeneous tile 10 x 60 cm m1 32.32 41,000.00 1,325,120.00
Pekerjaan Plafond -
1 Plafond gypsum 9 mm, rangka metal furing m2 22.16 100,900.00 2,235,944.00
2 List Plafond m1 20.10 26,900.00 540,690.00
3 Cat plafond, acrylic emulsi m2 39.24 40,400.00 1,585,296.00
Railling -
1 Pekerjaan railing pipa BSP kombinasi besi tempa fin. Cat Duco m1 8.34 755,000.00 6,293,680.00
2 Pekerjaan hand railing pipa BSP fin. Cat Duco m1 8.03 465,500.00 3,739,827.00
Sub jumlah 2.A.2.23 37,938,249.11
24 Area Tangga (as 11-12/a-c)
Pekerjaan Lantai
1 Pasangan lantai homogeneous tile 60 x 60 cm polished area lantai dasar m2 22.16 343,700.00 7,616,392.00
2 Pasangan lantai homogeneous tile uk. 30 x 30 cm polished (bordes+anak tangga) m2 24.31 378,900.00 9,212,517.77
3 Pasangan lantai keramik step nozing 10 x 30 m1 41.73 65,700.00 2,741,332.50
4 Urugan pasir t=3cm m3 0.66 265,300.00 176,371.44
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 60.86 40,600.00 2,471,078.40
2 Plint homogeneous tile 10 x 60 cm m1 32.32 41,000.00 1,325,120.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 22.16 100,900.00 2,235,944.00
2 List Plafond m1 20.10 26,900.00 540,690.00
3 Cat plafond, acrylic emulsi m2 39.24 40,400.00 1,585,296.00
Railling - -
1 Pekerjaan railing pipa BSP kombinasi besi tempa fin. Cat Duco m1 8.34 755,000.00 6,293,680.00
2 Pekerjaan hand railing pipa BSP fin. Cat Duco m1 8.03 465,500.00 3,739,827.00
Sub jumlah 2.A.2.24 37,938,249.11
Jumlah 2.A.2 760,345,912.05
Jumlah 2.A 1,090,780,346.79
B FINISHING EXTERIOR
1 Cat dinding, kolom, balok struktur luar weathershield, acrylic emulsi m2 274.41 40,200.00 11,031,402.60
Sub jumlah 2.B.1 11,031,402.60
Jumlah 2.B 11,031,402.60

3 LANTAI DUA
A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding
1 Pasangan dinding bata merah ukuran tebal ½ bata, campuran spesi 1 Pc : 4 Ps m2 1,088.17 112,900.00 122,854,460.74
2 Pek. Plesteran m2 2,176.34 46,100.00 100,329,329.32
3 Pek. Acian m1 2,176.34 20,900.00 45,485,531.08
4 Plesteran + acian kolom, balok, dinding, lisplank beton struktur m2 76.03 67,000.00 5,094,144.00
5 Kolom praktis + ring balok ukuran 12 x 12 Cm m3 6.05 9,370,200.00 56,670,969.60
Sub Jumlah 3.A.1 330,434,434.74
2 Pekerjaan Finishing -
1 Koridor (as 2-11/b-c) -
Pekerjaan Lantai -
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 81.99 343,700.00 28,179,963.00
2 Plint homogeneous tile 10 x 60 cm m1 87.26 41,000.00 3,577,660.00
3 Urugan pasir t=3cm m3 2.46 265,300.00 652,558.41
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 235.60 40,600.00 9,565,441.20
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 81.99 100,900.00 8,272,791.00
2 List Plafond m1 87.26 26,900.00 2,347,294.00
3 Cat plafond, acrylic emulsi m2 81.99 40,400.00 3,312,396.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J2 unit 2.00 750,400.00 1,500,800.00
2 Pintu type P6 unit 4.00 3,612,900.00 14,451,600.00
3 Pintu type P7 unit 2.00 3,119,600.00 6,239,200.00
Sub jumlah 3.A.2.1 78,099,703.61
2 Shower (as 2-3/a-b) -
Pekerjaan Lantai -
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 6.50 166,800.00 1,084,200.00
2 Waterproofing coating m2 6.50 133,700.00 869,050.00
3 Urugan pasir t=3cm m3 0.20 265,300.00 51,733.50

EE GD. ASM PUTRA Page 111


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 37.65 217,300.00 8,181,345.00
1 Cat dinding, acrylic emulsi m2 15.75 40,600.00 639,450.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 6.50 127,000.00 825,500.00
2 List Plafond m1 22.50 26,900.00 605,250.00
3 Cat plafond, acrylic emulsi m2 6.50 40,400.00 262,600.00
Sanitary - -
1 Shower TOTO TX 492 SG bh 5.00 954,800.00 4,774,000.00
2 Floor Drain ex. Toto type TX1BN bh 5.00 432,400.00 2,162,000.00
3 Tempat sabun ex. Toto S161 bh 5.00 96,900.00 484,500.00
4 Gantungan baju ex. Toto type TX704ACW bh 5.00 359,700.00 1,798,500.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J3 unit 1.00 329,700.00 329,700.00
2 Pintu type P5 unit 5.00 2,115,200.00 10,576,000.00
3 Pintu type P6 unit 1.00 3,612,900.00 3,612,900.00
Sub jumlah 3.A.2.2 36,256,728.50
3 Selasar Shower (as 2-3/a-b)
Pekerjaan Lantai -
1 Pasangan lantai homogeneous tile 20 x 20 cm unpolished m2 5.81 166,800.00 969,108.00
2 Waterproofing coating m2 5.81 133,700.00 776,797.00
3 Urugan pasir t=3cm m3 0.17 265,300.00 46,241.79
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 24.50 40,600.00 994,497.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 5.81 127,000.00 737,870.00
2 List Plafond m1 11.95 26,900.00 321,455.00
3 Cat plafond, acrylic emulsi m2 5.81 40,400.00 234,724.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J3 unit 1.00 329,700.00 329,700.00
2 Pintu type P3 unit 1.00 2,807,100.00 2,807,100.00
Sub jumlah 3.A.2.3 7,217,492.79
4 R. Panel (as 3-4/a-b) -
Pekerjaan Lantai -
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 4.71 343,700.00 1,618,827.00
2 Plint homogeneous tile 10 x 60 cm m1 8.40 41,000.00 344,400.00
3 Urugan pasir t=3cm m3 0.14 265,300.00 37,486.89
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 27.87 40,600.00 1,131,522.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 4.71 100,900.00 475,239.00
2 List Plafond m1 9.30 26,900.00 250,170.00
3 Cat plafond, acrylic emulsi m2 4.71 40,400.00 190,284.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P3 unit 1.00 2,807,100.00 2,807,100.00
Sub jumlah 3.A.2.4 6,855,028.89
5 R. Tidur Pembina (as 3-4/a-b) -
Pekerjaan Lantai -
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 12.31 343,700.00 4,230,947.00
2 Plint homogeneous tile 10 x 60 cm m1 14.55 41,000.00 596,550.00
3 Urugan pasir t=3cm m3 0.37 265,300.00 97,975.29
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 37.28 40,600.00 1,513,669.50
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 12.31 100,900.00 1,242,079.00
2 List Plafond m1 16.15 26,900.00 434,435.00
3 Cat plafond, acrylic emulsi m2 12.31 40,400.00 497,324.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
2 Pintu type P1 unit 1.00 2,828,800.00 2,828,800.00
Sub jumlah 3.A.2.5 15,539,979.79
6 KM/WC (as 3-4/a-b) -
Pekerjaan Lantai -
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 4.36 166,800.00 727,248.00
2 Waterproofing coating m2 4.36 133,700.00 582,932.00
3 Urugan pasir t=3cm m3 0.13 265,300.00 34,701.24
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 17.90 217,300.00 3,889,670.00

EE GD. ASM PUTRA Page 112


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

1 Cat dinding, acrylic emulsi m2 6.27 40,600.00 254,359.00


Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 4.36 127,000.00 553,720.00
2 List Plafond m1 8.95 26,900.00 240,755.00
3 Cat plafond, acrylic emulsi m2 4.36 40,400.00 176,144.00
Sanitary - -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 1.00 1,393,300.00 1,393,300.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 1.00 312,800.00 312,800.00
3 Wastafel ex. Toto type LW 640 + kran TX 115 LESN bh 1.00 2,402,400.00 2,402,400.00
4 Shower TOTO TX 492 SG bh 1.00 954,800.00 954,800.00
5 Floor Drain ex. Toto type TX1BN bh 1.00 432,400.00 432,400.00
6 Tempat tisue ex. Toto AW360 J bh 1.00 538,100.00 538,100.00
7 Tempat sabun ex. Toto S161 bh 1.00 96,900.00 96,900.00
8 Gantungan baju ex. Toto type TX704ACW bh 1.00 359,700.00 359,700.00
9 Meja wastafel rangka baja fin. Granit m1 0.80 822,100.00 657,680.00
10 Kaca cermin t= 6 mm, multiplek 9 mm,List stainless steel m2 1.13 350,000.00 393,750.00
11 Bak Mandi fiber lapis keramik unit 1.00 2,003,300.00 2,003,300.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J3 unit 1.00 329,700.00 329,700.00
2 Pintu type P5 unit 1.00 2,115,200.00 2,115,200.00
Sub jumlah 3.A.2.6 18,449,559.24
7 R. Tidur Asrama (as 4-6/a-b) -
Pekerjaan Lantai -
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 45.70 343,700.00 15,707,090.00
2 Plint homogeneous tile 10 x 60 cm m1 27.30 41,000.00 1,119,300.00
3 Urugan pasir t=3cm m3 1.37 265,300.00 363,726.30
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 62.94 40,600.00 2,555,364.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 45.70 100,900.00 4,611,130.00
2 List Plafond m1 29.10 26,900.00 782,790.00
3 Cat plafond, acrylic emulsi m2 45.70 40,400.00 1,846,280.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 4.00 4,098,200.00 16,392,800.00
2 Pintu type P1 unit 2.00 2,828,800.00 5,657,600.00
Sub jumlah 3.A.2.7 49,036,080.30
8 R. Bersama (as 6-7/a-b) -
Pekerjaan Lantai -
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 21.10 343,700.00 7,252,070.00
2 Plint homogeneous tile 10 x 60 cm m1 16.35 41,000.00 670,350.00
3 Urugan pasir t=3cm m3 0.63 265,300.00 167,934.90
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 32.30 40,600.00 1,311,177.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 21.10 100,900.00 2,128,990.00
2 List Plafond m1 19.50 26,900.00 524,550.00
3 Cat plafond, acrylic emulsi m2 21.10 40,400.00 852,440.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 4.00 4,098,200.00 16,392,800.00
2 Pintu type P6 unit 2.00 3,612,900.00 7,225,800.00
Sub jumlah 3.A.2.8 36,526,111.90
9 R. Tidur Asrama (as 7-9/a-b) -
Pekerjaan Lantai -
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 45.70 343,700.00 15,707,090.00
2 Plint homogeneous tile 10 x 60 cm m1 27.30 41,000.00 1,119,300.00
3 Urugan pasir t=3cm m3 1.37 265,300.00 363,726.30
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 62.76 40,600.00 2,548,056.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 45.70 100,900.00 4,611,130.00
2 List Plafond m1 29.10 26,900.00 782,790.00
3 Cat plafond, acrylic emulsi m2 45.70 40,400.00 1,846,280.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 4.00 4,098,200.00 16,392,800.00
2 Pintu type P1 unit 2.00 2,828,800.00 5,657,600.00
Sub jumlah 3.A.2.9 49,028,772.30
10 R. Tidur Pembina (as 9-10/a-b) -
Pekerjaan Lantai -

EE GD. ASM PUTRA Page 113


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 12.31 343,700.00 4,230,947.00


2 Plint homogeneous tile 10 x 60 cm m1 14.55 41,000.00 596,550.00
3 Urugan pasir t=3cm m3 1.37 265,300.00 363,726.30
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 37.28 40,600.00 1,513,669.50
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 12.31 100,900.00 1,242,079.00
2 List Plafond m1 16.15 26,900.00 434,435.00
3 Cat plafond, acrylic emulsi m2 12.31 40,400.00 497,324.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 1.00 4,098,200.00 4,098,200.00
2 Pintu type P1 unit 1.00 2,828,800.00 2,828,800.00
Sub jumlah 3.A.2.10 15,805,730.80
11 R. Peralatan (as 9-10/a-b) -
Pekerjaan Lantai -
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 4.71 343,700.00 1,618,827.00
2 Plint homogeneous tile 10 x 60 cm m1 8.40 41,000.00 344,400.00
3 Urugan pasir t=3cm m3 0.14 265,300.00 37,486.89
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 23.13 40,600.00 939,078.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 4.71 100,900.00 475,239.00
2 List Plafond m1 9.30 26,900.00 250,170.00
3 Cat plafond, acrylic emulsi m2 4.71 40,400.00 190,284.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P3 unit 1.00 2,807,100.00 2,807,100.00
Sub jumlah 3.A.2.11 6,662,584.89
12 KM/WC (as 9-10/a-b) -
Pekerjaan Lantai -
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 4.36 166,800.00 727,248.00
2 Waterproofing coating m2 4.36 133,700.00 582,932.00
3 Urugan pasir t=3cm m3 0.13 265,300.00 34,701.24
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 16.36 217,300.00 3,555,028.00
2 Cat dinding, acrylic emulsi m2 6.27 40,600.00 254,359.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 4.36 127,000.00 553,720.00
2 List Plafond m1 8.95 26,900.00 240,755.00
3 Cat plafond, acrylic emulsi m2 4.36 40,400.00 176,144.00
Sanitary - -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 1.00 1,393,300.00 1,393,300.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 1.00 312,800.00 312,800.00
3 Wastafel ex. Toto type LW 640 + kran TX 115 LESN bh 1.00 2,402,400.00 2,402,400.00
4 Shower TOTO TX 492 SG bh 1.00 954,800.00 954,800.00
5 Floor Drain ex. Toto type TX1BN bh 1.00 432,400.00 432,400.00
6 Tempat tisue ex. Toto AW360 J bh 1.00 538,100.00 538,100.00
7 Tempat sabun ex. Toto S161 bh 1.00 96,900.00 96,900.00
8 Gantungan baju ex. Toto type TX704ACW bh 1.00 359,700.00 359,700.00
9 Meja wastafel rangka baja fin. Granit m1 0.80 822,100.00 657,680.00
10 Kaca cermin t= 6 mm, multiplek 9 mm,List stainless steel m2 1.13 350,000.00 393,750.00
11 Bak Mandi fiber lapis keramik unit 1.00 2,003,300.00 2,003,300.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J3 unit 1.00 329,700.00 329,700.00
2 Pintu type P5 unit 1.00 2,115,200.00 2,115,200.00
Sub jumlah 3.A.2.12 18,114,917.24
13 Shower (as 10-11/a-b) -
Pekerjaan Lantai -
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 6.50 166,800.00 1,084,200.00
2 Waterproofing coating m2 6.50 133,700.00 869,050.00
3 Urugan pasir t=3cm m3 0.20 265,300.00 51,733.50
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 37.65 217,300.00 8,181,345.00
2 Cat dinding, acrylic emulsi m2 15.75 40,600.00 639,450.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 6.50 127,000.00 825,500.00
2 List Plafond m1 22.50 26,900.00 605,250.00
3 Cat plafond, acrylic emulsi m2 6.50 40,400.00 262,600.00
Sanitary - -

EE GD. ASM PUTRA Page 114


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

1 Shower TOTO TX 492 SG bh 5.00 954,800.00 4,774,000.00


2 Floor Drain ex. Toto type TX1BN bh 5.00 432,400.00 2,162,000.00
3 Tempat sabun ex. Toto S161 bh 5.00 96,900.00 484,500.00
4 Gantungan baju ex. Toto type TX704ACW bh 5.00 359,700.00 1,798,500.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J3 unit 1.00 329,700.00 329,700.00
2 Pintu type P5 unit 5.00 2,115,200.00 10,576,000.00
3 Pintu type P6 unit 1.00 3,612,900.00 3,612,900.00
Sub jumlah 3.A.2.13 36,256,728.50
14 Selasar Shower (as 10-11/a-b) -
Pekerjaan Lantai -
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 7.31 166,800.00 1,219,408.08
2 Waterproofing coating m2 7.31 133,700.00 977,427.22
3 Urugan pasir t=3cm m3 0.22 265,300.00 58,185.07
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 23.45 217,300.00 5,095,685.00
2 Cat dinding, acrylic emulsi m2 10.93 40,600.00 443,636.20
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 7.31 127,000.00 928,446.20
2 List Plafond m1 15.61 26,900.00 419,909.00
3 Cat plafond, acrylic emulsi m2 7.31 40,400.00 295,348.24
Pekerjaan Pintu dan jendela - -
1 Jendela type J3 unit 1.00 329,700.00 329,700.00
2 Pintu type P3 unit 1.00 2,807,100.00 2,807,100.00
Sub jumlah 3.A.2.14 12,574,845.01
15 KM/WC, shower (as 2-4/c-d) -
Pekerjaan Lantai -
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 8.82 166,800.00 1,471,176.00
2 Waterproofing coating m2 8.82 133,700.00 1,179,234.00
3 Urugan pasir t=3cm m3 0.26 265,300.00 70,198.38
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 57.68 217,300.00 12,533,864.00
1 Cat dinding, acrylic emulsi m2 24.50 40,600.00 994,700.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 8.82 127,000.00 1,120,140.00
2 List Plafond m1 35.00 26,900.00 941,500.00
3 Cat plafond, acrylic emulsi m2 8.82 40,400.00 356,328.00
Sanitary - -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 6.00 1,393,300.00 8,359,800.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 6.00 312,800.00 1,876,800.00
3 Shower TOTO TX 492 SG bh 2.00 954,800.00 1,909,600.00
4 Tempat sabun ex. Toto S161 bh 2.00 96,900.00 193,800.00
5 Floor Drain ex. Toto type TX1BN bh 8.00 432,400.00 3,459,200.00
6 Tempat tisue ex. Toto AW360 J bh 6.00 538,100.00 3,228,600.00
7 Gantungan baju ex. Toto type TX704ACW bh 8.00 359,700.00 2,877,600.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J3 unit 2.00 329,700.00 659,400.00
2 Pintu type P5 unit 8.00 2,115,200.00 16,921,600.00
Sub jumlah 3.A.2.15 58,153,540.38
16 Selasar KM/WC, Shower (as 2-4/c-d) -
Pekerjaan Lantai -
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 9.77 166,800.00 1,629,636.00
2 Waterproofing coating m2 9.77 133,700.00 1,306,249.00
3 Urugan pasir t=3cm m3 0.29 265,300.00 77,759.43
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 23.63 40,600.00 959,175.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 9.77 127,000.00 1,240,790.00
2 List Plafond m1 14.35 26,900.00 386,015.00
3 Cat plafond, acrylic emulsi m2 9.77 40,400.00 394,708.00
Sanitary - -
1 Wastafel ex. Toto type LW 640 + kran TX 115 LESN bh 1.00 2,402,400.00 2,402,400.00
2 Meja wastafel rangka baja fin. Granit m1 1.08 822,100.00 883,757.50
3 Kaca cermin t= 6 mm, multiplek 9 mm,List stainless steel m2 1.61 350,000.00 564,375.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J3 unit 1.00 329,700.00 329,700.00
2 Pintu type P3 unit 1.00 2,807,100.00 2,807,100.00
Sub jumlah 3.A.2.16 12,981,664.93

EE GD. ASM PUTRA Page 115


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

17 Janitor (as 2-4/c-d) -


Pekerjaan Lantai -
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 1.54 343,700.00 529,298.00
2 Plint homogeneous tile 10 x 60 cm m1 4.20 41,000.00 172,200.00
3 Urugan pasir t=3cm m3 0.05 265,300.00 12,256.86
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 11.88 40,600.00 482,328.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 1.54 100,900.00 155,386.00
2 List Plafond m1 5.10 26,900.00 137,190.00
3 Cat plafond, acrylic emulsi m2 1.54 40,400.00 62,216.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P4 unit 1.00 2,258,200.00 2,258,200.00
Sub jumlah 3.A.2.17 3,809,074.86
18 R. Tidur Asrama (as 3-7/c-d) -
Pekerjaan Lantai -
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 68.93 343,700.00 23,691,241.00
2 Plint homogeneous tile 10 x 60 cm m1 35.50 41,000.00 1,455,500.00
3 Urugan pasir t=3cm m3 2.07 265,300.00 548,613.87
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 80.24 40,600.00 3,257,541.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 68.93 100,900.00 6,955,037.00
2 List Plafond m1 39.10 26,900.00 1,051,790.00
3 Cat plafond, acrylic emulsi m2 68.93 40,400.00 2,784,772.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 6.00 4,098,200.00 24,589,200.00
2 Pintu type P2 unit 2.00 4,872,300.00 9,744,600.00
Sub jumlah 3.A.2.18 74,078,294.87
19 R. Tidur Asrama (as 6-10/c-d) -
Pekerjaan Lantai -
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 68.93 343,700.00 23,691,241.00
2 Plint homogeneous tile 10 x 60 cm m1 35.50 41,000.00 1,455,500.00
3 Urugan pasir t=3cm m3 2.07 265,300.00 548,613.87
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 80.24 40,600.00 3,257,541.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 68.93 100,900.00 6,955,037.00
2 List Plafond m1 39.10 26,900.00 1,051,790.00
3 Cat plafond, acrylic emulsi m2 68.93 40,400.00 2,784,772.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J1 unit 6.00 4,098,200.00 24,589,200.00
2 Pintu type P2 unit 2.00 4,872,300.00 9,744,600.00
Sub jumlah 3.A.2.19 74,078,294.87
20 KM/WC, shower (as 9-11/c-d) -
Pekerjaan Lantai -
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 8.82 166,800.00 1,471,176.00
2 Waterproofing coating m2 8.82 133,700.00 1,179,234.00
3 Urugan pasir t=3cm m3 0.26 265,300.00 70,198.38
Pekerjaan Dinding - -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 57.68 217,300.00 12,533,864.00
1 Cat dinding, acrylic emulsi m2 24.50 40,600.00 994,700.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 8.82 127,000.00 1,120,140.00
2 List Plafond m1 35.00 26,900.00 941,500.00
3 Cat plafond, acrylic emulsi m2 8.82 40,400.00 356,328.00
Sanitary - -
1 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J bh 6.00 1,393,300.00 8,359,800.00
2 Jet Washer ex. Toto type THX 20 NBPIV bh 6.00 312,800.00 1,876,800.00
3 Shower TOTO TX 492 SG bh 2.00 954,800.00 1,909,600.00
4 Tempat sabun ex. Toto S161 bh 2.00 96,900.00 193,800.00
5 Floor Drain ex. Toto type TX1BN bh 8.00 432,400.00 3,459,200.00
6 Tempat tisue ex. Toto AW360 J bh 6.00 538,100.00 3,228,600.00
7 Gantungan baju ex. Toto type TX704ACW bh 8.00 359,700.00 2,877,600.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J3 unit 2.00 329,700.00 659,400.00
2 Pintu type P5 unit 8.00 2,115,200.00 16,921,600.00
Sub jumlah 3.A.2.20 58,153,540.38

EE GD. ASM PUTRA Page 116


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

21 Selasar KM/WC, Shower (as 9-10/c-d) -


Pekerjaan Lantai -
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 9.77 166,800.00 1,629,636.00
2 Waterproofing coating m2 9.77 133,700.00 1,306,249.00
3 Urugan pasir t=3cm m3 0.29 265,300.00 77,759.43
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 23.63 40,600.00 959,175.00
Pekerjaan Plafond - -
1 Plafond WR (water resistance) Gypsum 9 mm, rangka metal furing m2 9.77 127,000.00 1,240,790.00
2 List Plafond m1 14.35 26,900.00 386,015.00
3 Cat plafond, acrylic emulsi m2 9.77 40,400.00 394,708.00
Sanitary - -
1 Wastafel ex. Toto type LW 640 + kran TX 115 LESN bh 1.00 2,402,400.00 2,402,400.00
2 Meja wastafel rangka baja fin. Granit m1 1.08 822,100.00 883,757.50
3 Kaca cermin t= 6 mm, multiplek 9 mm,List stainless steel m2 1.61 350,000.00 564,375.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J3 unit 1.00 329,700.00 329,700.00
2 Pintu type P3 unit 1.00 2,807,100.00 2,807,100.00
Sub jumlah 3.A.2.21 12,981,664.93
22 Janitor (as 6-10/c-d) -
Pekerjaan Lantai -
1 Pasangan lantai homogeneous tile 60 x 60 cm polished m2 1.54 343,700.00 529,298.00
2 Plint homogeneous tile 10 x 60 cm m1 4.20 41,000.00 172,200.00
3 Urugan pasir t=3cm m3 0.05 265,300.00 12,256.86
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 11.88 40,600.00 482,328.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 1.54 100,900.00 155,386.00
2 List Plafond m1 5.10 26,900.00 137,190.00
3 Cat plafond, acrylic emulsi m2 1.54 40,400.00 62,216.00
Pekerjaan Pintu dan jendela - -
1 Pintu type P4 unit 1.00 2,258,200.00 2,258,200.00
Sub jumlah 3.A.2.22 3,809,074.86
23 Area Tangga (as 1-2/a-c) -
Pekerjaan Lantai -
1 Pasangan lantai homogeneous tile 60 x 60 cm polished area lantai dasar m2 22.16 343,700.00 7,616,392.00
2 Pasangan lantai homogeneous tile uk. 30 x 30 cm polished (bordes+anak tangga) m2 24.31 378,900.00 9,212,517.77
3 Pasangan lantai keramik step nozing 10 x 30 m1 41.73 65,700.00 2,741,332.50
4 Urugan pasir t=3cm m3 0.66 265,300.00 176,371.44
Pekerjaan Dinding - -
1 Cat dinding, acrylic emulsi m2 60.86 40,600.00 2,471,078.40
2 Plint homogeneous tile 10 x 60 cm m1 32.32 41,000.00 1,325,120.00
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 22.16 100,900.00 2,235,944.00
2 List Plafond m1 20.10 26,900.00 540,690.00
3 Cat plafond, acrylic emulsi m2 39.24 40,400.00 1,585,296.00
Railling - -
1 Pekerjaan railing pipa BSP kombinasi besi tempa fin. Cat Duco m1 8.34 755,000.00 6,293,680.00
2 Pekerjaan hand railing pipa BSP fin. Cat Duco m1 8.03 465,500.00 3,739,827.00
Sub jumlah 3.A.2.23 37,938,249.11
24 Area Tangga (as 11-12/a-c) -
Pekerjaan Lantai -
1 Pasangan lantai homogeneous tile 60 x 60 cm polished area lantai dasar m2 22.16 343,700.00 7,616,392.00
2 Urugan pasir t=3cm m3 0.66 265,300.00 176,371.44
Pekerjaan Dinding 65,700.00 -
1 Cat dinding, acrylic emulsi m2 60.86 40,600.00 2,471,078.40
2 Plint homogeneous tile 10 x 60 cm m1 32.32 41,000.00 1,325,120.00
Pekerjaan Plafond -
1 Plafond gypsum 9 mm, rangka metal furing m2 22.16 100,900.00 2,235,944.00
2 List Plafond m1 20.10 26,900.00 540,690.00
3 Cat plafond, acrylic emulsi m2 39.24 40,400.00 1,585,296.00
Sub jumlah 3.A.2.24 15,950,891.84
Jumlah 3.A.2 738,358,554.78
Jumlah 3.A 1,068,792,989.52
B FINISHING EXTERIOR
1 Cat dinding, kolom, balok struktur luar weathershield, acrylic emulsi m2 274.41 40,200.00 11,031,402.60
Sub jumlah 3.B.1 11,031,402.60
Jumlah 3.B 11,031,402.60

EE GD. ASM PUTRA Page 117


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

4 LANTAI DAK ATAP


A PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding
1 Pasangan dinding bata merah ukuran tebal ½ bata, campuran spesi 1 Pc : 4 Ps m2 195.34 112,900.00 22,053,434.40
2 Pek. Plesteran m2 390.67 46,100.00 18,009,979.20
3 Pek. Acian m2 390.67 20,900.00 8,165,044.80
4 Kolom praktis + ring balok ukuran 12 x 12 Cm m3 0.88 9,370,200.00 8,257,769.86
Jumlah 4.A.1 56,486,228.26
2 Pekerjaan Finishing
1 Lantai dak atap (as 1-12/a-d)
Pekerjaan Lantai
1 screeding + waterproofing membran m2 536.66 168,500.00 90,427,210.00
Sub jumlah 4.A.2.1 90,427,210.00
2 Laundry (as 3-4/a-d)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 22.50 166,800.00 3,753,000.00
2 Waterproofing coating m2 22.50 133,700.00 3,008,250.00
3 Urugan pasir t=3cm m3 0.68 265,300.00 179,077.50
Pekerjaan Dinding -
1 Pasangan dinding keramik tile 20 x 40 cm polished m2 9.48 217,300.00 2,060,004.00
2 Cat dinding, acrylic emulsi m2 9.48 40,600.00 384,888.00
Pekerjaan Penutup atap -
1 Penutup atap polycarbonate rangka hollow galvalum fin. Cat m2 60.00 780,000.00 46,800,000.00
Sanitary -
1 Kran Ex. Toto type. TX609 bh 10.00 170,500.00 1,705,000.00
2 Floor Drain ex. Toto type TX1BN bh 2.00 432,400.00 864,800.00
Sub jumlah 4.A.2.2 58,755,019.50
3 R. Jemur (as 4-6/a-d)
Pekerjaan Lantai
1 Pasangan lantai keramik tile 20 x 20 cm unpolished m2 45.00 166,800.00 7,506,000.00
2 Waterproofing coating m2 45.00 133,700.00 6,016,500.00
3 Urugan pasir t=3cm m3 1.35 265,300.00 358,155.00
Pekerjaan Dinding -
1 Cat dinding, acrylic emulsi m2 31.68 40,600.00 1,286,208.00
Pekerjaan Penutup atap -
1 Penutup atap polycarbonate rangka hollow galvalum fin. Cat m2 60.00 780,000.00 46,800,000.00
Sub jumlah 4.A.2.3 61,966,863.00
4 Area Tangga (as 1-2/a-c)
Pekerjaan Dinding
1 Cat dinding, acrylic emulsi m2 60.86 40,600.00 2,471,078.40
Pekerjaan Plafond -
1 Plafond gypsum 9 mm, rangka metal furing m2 22.16 100,900.00 2,235,944.00
2 List Plafond m1 20.10 26,900.00 540,690.00
3 Cat plafond, acrylic emulsi m2 39.24 40,400.00 1,585,296.00
Pekerjaan Dak Beton -
1 Waterprofing coating m2 22.16 133,700.00 2,962,792.00
Pekerjaan Pintu dan jendela -
1 Jendela type J2 unit 1.00 750,400.00 750,400.00
2 Pintu type P8 unit 1.00 10,960,900.00 10,960,900.00
Sub jumlah 4.A.2.4 21,507,100.40
5 Area Tangga (as 11-12/a-c)
Pekerjaan Dinding
1 Cat dinding, acrylic emulsi m2 60.86 40,600.00 2,471,078.40
Pekerjaan Plafond - -
1 Plafond gypsum 9 mm, rangka metal furing m2 22.16 100,900.00 2,235,944.00
2 List Plafond m1 20.10 26,900.00 540,690.00
3 Cat plafond, acrylic emulsi m2 39.24 40,400.00 1,585,296.00
Pekerjaan Dak Beton - -
1 Waterprofing coating m2 22.16 133,700.00 2,962,792.00
Pekerjaan Pintu dan jendela - -
1 Jendela type J2 unit 1.00 750,400.00 750,400.00
Sub jumlah 4.A.2.5 10,546,200.40
Jumlah 4.A.2 243,202,393.30
Jumlah 4.A 299,688,621.56
B FINISHING EXTERIOR
1 Cat dinding, kolom, balok struktur luar weathershield, acrylic emulsi m2 192.34 40,200.00 7,732,148.40
2 Sign Name Stainless steel plate lot 1.00 15,000,000.00 15,000,000.00
Sub jumlah 4.B.1 22,732,148.40

EE GD. ASM PUTRA Page 118


HARGA JUMLAH
SAT. SATUAN HARGA
NO. JENIS PEKERJAAN VOL ( Rp ) ( Rp )

Jumlah 4.B 22,732,148.40

EE GD. ASM PUTRA Page 119


REKAPITULASI
ENGINEERING ESTIMATE (EE)
BANGUNAN PENDUKUNG
Pekerjaan : Pembangunan Politeknik KP Pangandaran
Lokasi : Pangandaran - Jawa Barat
Thn Anggaran : 2017

JUMLAH HARGA
NO. JENIS PEKERJAAN
(Rp.)

I RUMAH POMPA 803,195,979.00

II GARDU PLN 87,120,772.83

JUMLAH 890,316,751.83
ENGINEERING ESTIMATE
(EE)

Pekerjaan : Pembangunan Politeknik KP Pangandaran


Lokasi : Pangandaran - Jawa Barat
Thn Anggaran : 2016

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

POS JAGA

A PEKERJAAN STRUKTUR
I PEKERJAAN TANAH
a Pek. Galian Tanah Pondasi Batu Kali m3 29.03 44,500.00 1,291,835.00
b Pek. Urug Kembali m3 20.55 14,800.00 304,140.00
JUMLAH 1,595,975.00
II PEKERJAAN BETON
a Pek. Pondasi Batu Kali
Pek. Urug pasir, t = 10 cm m3 1.35 265,300.00 358,155.00
Pek. Batu Kosong / Aanstamping m3 3.38 390,000.00 1,318,200.00
Pek. Pasangan Batu Kali m3 7.80 719,500.00 5,612,100.00
b Pek. Sloof SF1 20x25 cm
Pek. Bekisting, 2 x pakai m2 5.40 89,950.00 485,730.00
Besi U-24 kg 136.00 12,600.00 1,713,600.00
Pek. Beton mutu K-250 m3 0.68 1,269,600.00 863,328.00
c Pek. Rabat Beton mutu K-175, t = 10 cm m3 0.86 1,211,800.00 1,042,148.00
d Pek. Kolom Praktis KP1 15x15 cm
Pek. Bekisting, 2 x pakai m2 18.24 191,850.00 3,499,344.00
Besi U-24 kg 136.00 12,600.00 1,713,600.00
Pek. Beton mutu K-250 m3 0.68 1,269,600.00 863,328.00
e Pek. Ringbalk RB1 15x15 cm
Pek. Bekisting, 2 x pakai m2 5.40 200,500.00 1,082,700.00
Besi U-24 kg 60.00 12,600.00 756,000.00
Pek. Beton mutu K-250 m3 0.30 1,269,600.00 380,880.00
f Pek. Dak Beton, t = 10 cm
Pek. Bekisting, 2 x pakai m2 6.98 191,850.00 1,338,153.75
Besi U-24 kg 300.00 12,600.00 3,780,000.00
Pek. Beton mutu K-250 m3 1.50 1,269,600.00 1,904,400.00
Waterproofing sheet + screeding 3 cm m2 9.00 168,500.00 1,516,500.00
g Pek. Topi Beton
Pek. Bekisting, 2 x pakai m2 1.15 191,850.00 220,627.50
Besi U-24 kg 16.00 12,600.00 201,600.00
Pek. Beton mutu K-175 m3 0.08 1,211,800.00 96,944.00
JUMLAH 28,747,338.25
III PEKERJAAN ARSITEKTUR
1 Pekerjaan Penutup Lantai dan Dinding
a Pek. Pasir Urug, t = 10 cm m3 9.00 265,300.00 2,387,700.00
b Pek. Pasangan Dinding 1/2 Bata, 1 PC : 4 Psr m2 47.41 112,900.00 5,352,589.00
b Pek. Plesteran 1 PC : 5 Psr m2 94.82 46,100.00 4,371,202.00
c Pek. Acian m2 94.82 20,900.00 1,981,738.00
d Pek. Lantai Homogenious Tile 60 x 60 cm m2 7.50 343,700.00 2,577,750.00
e Pek. Keramik lantai KM/WC 30 x 30 cm, non slip m2 1.50 155,800.00 233,700.00
f Pek. Keramik dinding 30 x 30 cm m2 4.80 157,400.00 755,520.00
g Pek. Meja Beton Mutu K-175 m3 0.06 1,211,800.00 72,708.00

2 Pekerjaan Plafond
a Pek. Rangka Plafond, hollow 40x40 + GRC m2 9.00 127,000.00 1,143,000.00

3 Pekerjaan Pengecatan
a Pek. Pengecatan Dinding m2 94.82 40,600.00 3,849,692.00
b Pek. Pengecatan Plafond m2 9.00 40,400.00 363,600.00
4 Pekerjaan Kusen Pintu, Jendela dan Kaca
a Pas. Kusen dan daun pintu type P1 ( 1 unit ) bh 1.00 2,828,800.00 2,828,800.00
b Pas. Kusen dan daun pintu type P2 ( 1 unit ) bh 1.00 2,807,100.00 2,807,100.00
c Pas. Kusen dan daun jendela type J1 ( 1 unit ) bh 1.00 3,037,400.00 3,037,400.00
d Pas. Kusen dan daun jendela type J2 ( 1 unit ) bh 1.00 2,807,200.00 2,807,200.00
e Pas. Kusen dan daun jendela type BV ( 1 unit ) bh 1.00 329,700.00 329,700.00
JUMLAH 34,899,399.00
IV PEKERJAAN MEP
1 Fixtures Lavatory
a Kloset Jongkok bh 1.00 316,200.00 316,200.00
b Kran tembok diameter ¾" atau ½" bh 1.00 170,500.00 170,500.00
c Floor Drain bh 1.00 432,400.00 432,400.00

JUMLAH 919,100.00

JUMLAH BIAYA POS JAGA 66,161,812.25


ENGINEERING ESTIMATE
(EE)

Pekerjaan : Pembangunan Politeknik KP Pangandaran


Lokasi : Pangandaran - Jawa Barat
Thn Anggaran : 2018

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

RUMAH POMPA

A PEKERJAAN STRUKTUR
I PEKERJAAN TANAH
a Pek. Galian Tanah Kolam Clean Water m3 90.00 54,900.00 4,941,000.00
b Pek. Galian Tanah Kolam Hydrant Water m3 60.00 - -
c Pek. Galian Sloof 20x25 cm m3 12.15 44,500.00 540,675.00
JUMLAH 5,481,675.00
II PEKERJAAN BETON
1 Pekerjaan Struktur Lt. Dasar El. -2.85 m s/d +0.00 m
a Pek. Urug pasir, t = 10 cm m3 20.91 265,300.00 5,547,423.00
b Pek. Lantai Kerja Beton K-125, t = 5 cm m3 10.30 655,000.00 6,746,500.00
c Pek. Bekisting, 2 x pakai m2 600.00 191,850.00 115,110,000.00
d Pek. Wiremesh M6, 2 lapis m2 405.40 54,100.00 21,932,140.00
e Pek. Beton mutu K-300 m3 75.81 1,379,900.00 104,610,219.00
f Waterproofing membrane sheet m2 477.76 168,500.00 80,502,560.00
g Floor Hardener m2 100.00 89,400.00 8,940,000.00
h Pek. Rabat Beton mutu K-175, t = 15 cm m3 14.85 1,211,800.00 17,995,230.00
JUMLAH 361,384,072.00

2 Pekerjaan Struktur Lt. 1 dan Atap El. +0.00 m s/d +4.50 m


a Pek. Kolom K1 20x20 cm
Pek. Bekisting, 2 x pakai m2 64.80 383,700.00 24,863,760.00
Besi U-24 kg 648.00 12,600.00 8,164,800.00
Beton mutu K-250 m3 3.24 1,269,600.00 4,113,504.00
b Pek. Balok B1 20x25 cm
Pek. Bekisting, 2 x pakai m2 34.84 401,000.00 13,970,840.00
Besi U-24 kg 1,340.00 12,600.00 16,884,000.00
Beton mutu K-250 m3 6.70 1,269,600.00 8,506,320.00
c Pek. Dak Beton P1 120 mm
Pek. Bekisting, 2 x pakai m2 149.50 383,700.00 57,363,150.00
Pek. Wiremesh M6, 2 lapis m2 299.00 54,100.00 16,175,900.00
Beton mutu K-250 m3 35.88 1,269,600.00 45,553,248.00
Waterproofing sheet + screeding 3 cm m2 320.96 177,900.00 57,098,784.00
d Pek. Lisplank
Pek. Bekisting, 2 x pakai m2 120.96 179,900.00 21,760,704.00
Besi U-24 kg 1,275.00 12,600.00 16,065,000.00
Beton mutu K-250 m3 8.50 1,269,600.00 10,791,600.00
JUMLAH 301,311,610.00

III PEKERJAAN ARSITEKTUR


1 Pekerjaan Dinding dan Pengecatan
a Pek. Pasangan Dinding 1/2 Bata, 1 PC : 4 Psr m2 393.69 108,600.00 42,754,734.00
b Pek. Plesteran 1 PC : 5 Psr m2 787.38 46,100.00 36,298,218.00
c Pek. Acian m2 787.38 20,900.00 16,456,242.00
d Pek. Pengecatan m2 787.38 40,600.00 31,967,628.00
e Lubang Mainhole 60x60 cm bh 2.00 135,000.00 270,000.00
f Tutup Mainhole 80x80 cm bh 2.00 250,000.00 500,000.00
g Pek. Pintu Besi P1 Lengkap Terpasang bh 2.00 3,385,900.00 6,771,800.00
JUMLAH 135,018,622.00

JUMLAH BIAYA RUMAH POMPA 803,195,979.00


ENGINEERING ESTIMATE
(EE)

Pekerjaan : Pembangunan Politeknik KP Pangandaran


Lokasi : Pangandaran - Jawa Barat
Thn Anggaran : 2016

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

GARDU PLN

A PEKERJAAN STRUKTUR
I PEKERJAAN TANAH
a Pek. Galian Tanah Pondasi Telapak 60x60 cm m3 2.16 54,900.00 118,584.00
b Pek. Galian Tanah Pondasi Batu Kali m3 3.73 54,900.00 204,777.00
c Pek. Galian el. -1.35 m m3 4.96 54,900.00 272,304.00
d Pek. Urug Kembali m3 8.92 14,800.00 132,016.00
JUMLAH 727,681.00
II PEKERJAAN BETON
a Pek. Pondasi Batu Kali
Pek. Urug pasir, t = 10 cm m3 0.83 265,300.00 220,199.00
Pek. Batu Kosong / Aanstamping m3 0.60 390,000.00 234,000.00
Pek. Pasangan Batu Kali m3 1.71 719,500.00 1,230,345.00
b Pek. Pondasi Telapak 60x60 cm
Pek. Urug pasir, t = 10 cm m3 0.14 265,300.00 37,142.00
Pek. Lantai kerja beton K-125, t = 5 cm m3 0.07 655,000.00 45,850.00
Pek. Bekisting, 2 x pakai m2 2.40 83,200.00 199,680.00
Besi U-24 kg 44.00 12,600.00 554,400.00
Pek. Beton mutu K-250 m3 0.22 1,269,600.00 279,312.00
c Pek. Plat Lantai t = 150 mm
Pek. Urug pasir, t = 10 cm m3 1.09 265,300.00 288,292.67
Pek. Lantai kerja beton K-125, t = 5 cm m3 0.54 655,000.00 355,883.33
Wiremesh M7, 2 lapis m2 10.87 54,100.00 587,886.67
Pek. Beton mutu K-250 m3 1.63 1,269,600.00 2,069,448.00
Floor Hardener m2 11.90 89,400.00 1,063,860.00
d Pek. Dinding Beton, t = 150 mm
Pek. Bekisting, 2 x pakai m2 26.13 191,850.00 5,013,680.00
Besi U-24 kg 392.00 12,600.00 4,939,200.00
Pek. Beton mutu K-250 m3 1.96 1,269,600.00 2,488,416.00
e Pek. Rabat Beton, t = 120 mm
Wiremesh M7, 2 lapis m2 9.17 54,100.00 495,916.67
Pek. Beton mutu K-250 m3 1.10 1,269,600.00 1,396,560.00
f Pek. Kolom Pedestal K1 20x20 cm
Pek. Bekisting, 2 x pakai m2 4.25 191,850.00 815,362.50
Besi U-24 kg 34.00 12,600.00 428,400.00
Pek. Beton mutu K-250 m3 0.17 1,269,600.00 215,832.00
g Pek. Kolom Praktis KP1 15x15 cm
Pek. Bekisting, 2 x pakai m2 7.20 191,850.00 1,381,320.00
Besi U-24 kg 54.00 12,600.00 680,400.00
Pek. Beton mutu K-250 m3 0.27 1,269,600.00 342,792.00
h Pek. Ringbalk RB1 15x25 cm
Pek. Bekisting, 2 x pakai m2 4.14 200,500.00 830,070.00
Besi U-24 kg 62.00 12,600.00 781,200.00
Pek. Beton mutu K-250 m3 0.31 1,269,600.00 393,576.00
i Pek. Dak Beton, t = 100 mm
Pek. Bekisting, 2 x pakai m2 23.50 191,850.00 4,508,475.00
Besi U-24 kg 470.00 12,600.00 5,922,000.00
Pek. Beton mutu K-250 m3 2.35 1,269,600.00 2,983,560.00
Waterproofing sheet + screeding 3 cm m2 31.81 168,500.00 5,359,985.00
j Pek. Lisplank
Pek. Bekisting, 2 x pakai m2 4.05 200,500.00 812,025.00
Besi U-24 kg 162.00 12,600.00 2,041,200.00
Pek. Beton mutu K-250 m3 0.81 1,269,600.00 1,028,376.00
JUMLAH 50,024,644.83
III PEKERJAAN ARSITEKTUR
1 Pekerjaan Penutup Lantai dan Dinding
b Pek. Pasangan Dinding 1/2 Bata, 1 PC : 4 Psr m2 35.83 112,900.00 4,045,207.00
b Pek. Plesteran 1 PC : 5 Psr m2 71.66 46,100.00 3,303,526.00
c Pek. Acian m2 71.66 20,900.00 1,497,694.00

2 Pekerjaan Pengecatan
a Pek. Pengecatan Dinding m2 71.66 40,600.00 2,909,396.00

3 Pekerjaan Kusen Pintu, Jendela dan Kaca


a Pas. Kusen dan daun pintu besi type P1 ( 1 unit ) bh 1.00 3,094,000.00 3,094,000.00
c Pas. Kusen dan daun jendela besi type BV1 ( 1 unit ) bh 5.00 3,781,600.00 18,908,000.00

JUMLAH 33,757,823.00
IV PEKERJAAN MEP
1 Plumbing
a PVC dia. 4" m' 12.00 104,180.00 1,250,160.00
b Roof Drain bh 4.00 215,100.00 860,400.00
c Knee dia. 4" bh 12.00 41,672.00 500,064.00

JUMLAH 2,610,624.00

JUMLAH BIAYA GARDU PLN 87,120,772.83


ENGINEERING ESTIMATE
(EE)

Pekerjaan : Pembangunan Politeknik KP Pangandaran


Lokasi : Pangandaran - Jawa Barat
Thn Anggaran : 2018

HARGA JUMLAH
NO. JENIS PEKERJAAN SAT. VOL SATUAN HARGA
( Rp ) ( Rp )

RUANG GENSET

A PEKERJAAN STRUKTUR
I PEKERJAAN TANAH
a Pek. Galian Tanah Pondasi Batu Kali m3 32.21 44,500.00 1,433,345.00
b Pek. Urug Kembali m3 6.90 14,800.00 102,120.00
JUMLAH 1,535,465.00
II PEKERJAAN BETON
a Pek. Pondasi Batu Kali
Pek. Urug pasir, t = 10 cm m3 3.18 265,300.00 843,654.00
Pek. Batu Kosong / Aanstamping m3 7.95 390,000.00 3,100,500.00
Pek. Pasangan Batu Kali m3 22.66 719,500.00 16,303,870.00
b Pek. Sloof SF1 20x25 cm
Pek. Bekisting, 2 x pakai m2 26.50 89,950.00 2,383,675.00
Besi U-24 kg 530.00 12,600.00 6,678,000.00
Pek. Beton mutu K-250 m3 2.65 1,269,600.00 3,364,440.00
c Pek. Plat Lantai t = 200 mm
Pek. Urug pasir, t = 10 cm m3 7.70 265,300.00 2,042,810.00
Pek. Lantai kerja beton K-125, t = 5 cm m3 3.85 655,000.00 2,521,750.00
Wiremesh M7, 2 lapis m2 77.00 54,100.00 4,165,700.00
Pek. Beton mutu K-250 m3 15.40 1,269,600.00 19,551,840.00
Floor Hardener m2 77.00 89,400.00 6,883,800.00
d Pek. Rabat Beton, t = 200 mm
Wiremesh M7, 2 lapis m2 40.00 54,100.00 2,164,000.00
Pek. Beton mutu K-250 m3 8.00 1,269,600.00 10,156,800.00
e Pek. Kolom Praktis KP1 15x15 cm
Pek. Bekisting multiplek 12 mm m2 34.65 191,850.00 6,647,602.50
Besi U-24 kg 2,598.00 12,600.00 32,734,800.00
Pek. Beton mutu K-250 m3 12.99 1,269,600.00 16,492,104.00
f Pek. Ringbalk RB1 15x25 cm
Pek. Bekisting multiplek 12 mm m2 4.51 200,500.00 904,255.00
Besi U-24 kg 82.00 12,600.00 1,033,200.00
Pek. Beton mutu K-250 m3 0.41 1,269,600.00 520,536.00
g Pek. Dak Beton, t = 120 mm
Pek. Bekisting multiplek 12 mm m2 162.00 191,850.00 31,079,700.00
Besi U-24 kg 3,888.00 12,600.00 48,988,800.00
Pek. Beton mutu K-250 m3 19.44 1,269,600.00 24,681,024.00
h Pek. Ram Jalan Beton K-175 m3 0.55 1,211,800.00 666,490.00
JUMLAH 243,909,350.50
III PEKERJAAN ARSITEKTUR
1 Pekerjaan Penutup Lantai dan Dinding
a Pek. Pasangan Dinding 1/2 Bata, 1 PC : 4 Psr m2 114.57 112,900.00 12,934,953.00
b Pek. Plesteran 1 PC : 5 Psr m2 229.14 46,100.00 10,563,354.00
c Pek. Acian m2 229.14 20,900.00 4,789,026.00

2 Pekerjaan Plafond
a Pek. Rangka Plafond, hollow 40x40 + GRC m2 117.00 127,000.00 14,859,000.00

3 Pekerjaan Pengecatan
a Pek. Pengecatan Dinding m2 229.14 40,600.00 9,303,084.00
b Pek. Pengecatan Plafond m2 117.00 40,400.00 4,726,800.00
4 Pekerjaan Kusen Pintu, Jendela dan Kaca
a Pas. Kusen dan daun pintu besi wiremesh type P1 ( 1 unit ) bh 1.00 2,671,000.00 2,671,000.00
b Pas. Kusen dan daun pintubesi type P2 ( 1 unit ) bh 2.00 4,925,900.00 9,851,800.00
c Pas. Kusen dan daun jendela type BV1 ( 1 unit ) bh 4.00 321,400.00 1,285,600.00
d Pas. Kusen dan daun jendela type BV2 ( 1 unit ) bh 9.00 1,311,500.00 11,803,500.00
e Pas. Kusen dan daun jendela type BV3 ( 1 unit ) bh 9.00 1,034,400.00 9,309,600.00
JUMLAH 92,097,717.00

JUMLAH BIAYA RUANG GENSET 337,542,532.50


DAFTAR HARGA
SATUAN PEKERJAAN
Pekerjaan : Pembangunan Politeknik KP Pangandaran
Lokasi : Pangandaran - Jawa Barat
Thn Anggaran : 2018

HARGA SATUAN
NO. JENIS PEKERJAAN
(Rp)

1 1 m2 Pembuatan kantor sementara, dengan lantai plesteran 956,600.00


2 1 m2 Pembuatan gudang dan alat-alat sementara, dengan lantai plesteran 879,400.00
3 1 m1 Pagar sementara dari seng gelombang tinggi 2m 378,100.00
4 1 bh Memasang Papan Nama Proyek 80x120 cm 562,000.00
5 1 m1 Pengukuran dan pemasangan bouwplank 33,500.00
6 1 m3 Galian tanah biasa sedalam 1 meter 44,500.00
7 1 m3 Galian tanah biasa sedalam 2 meter 54,900.00
8 1 m3 Urugan kembali (1/3 dari Indeks Pek. Galian 1 m1) 14,800.00
9 1 m3 Urugan pasir padat 265,300.00
10 1 m3 Urugan sirtu padat untuk peninggian lantai bangunan 247,600.00
11 1 m3 Urugan pematangan tanah Cabluk 170,000.00
12 1 m3 Pemindahan dan Pemadatan tanah 32,200.00
13 1 m3 Pasang pondasi batu belah, 1 Pc : 4 Ps 719,500.00
14 1 m3 Pasang pondasi batu kosong (aanstamping) 390,000.00
15 1 m3 Pasang Rollag bata 1 Pc : 4 Ps 1,041,400.00
16 1 m2 Pasangan dinding bata merah ukuran tebal ½ bata, campuran spesi 1 Pc : 3 Ps 117,100.00
17 1 m2 Pasangan dinding bata merah ukuran tebal ½ bata, campuran spesi 1 Pc : 4 Ps 112,900.00
18 1 m2 Plesteran 1 Pc : 3 Ps, tebal 20 mm 50,000.00
19 1 m2 Plesteran 1 Pc : 5 Ps, tebal 20 mm 46,100.00
20 1 m2 Pasangan dinding rooster beton, campuran spesi 1 Pc : 4 Ps 303,500.00
21 1 m2 Membuat acian 20,900.00
22 1 m2 Pasangan floor hardener 89,400.00
23 1 m2 Memasang listplank ukuran 1,2/30 GRC 44,800.00
24 1 m3 Membuat lantai kerja Beton mutu K-125 655,000.00
25 1 m3 Membuat Beton Ready Mix Mutu K - 175 1,211,800.00
26 1 m3 Membuat Beton Ready Mix Mutu K - 250 1,269,600.00
27 1 m3 Membuat Beton Ready Mix Mutu K - 275 1,316,900.00
28 1 m3 Membuat Beton Ready Mix Mutu K - 300 1,379,900.00
29 1 m2 Pembesian dengan Wiremesh M6 2 lapis 54,100.00
30 1 Kg Pembesian dengan besi U 24 12,600.00
31 1 Kg Pembesian dengan besi U 42 13,900.00
32 1 M2 Memasang bekisting untuk pondasi 166,400.00
33 1 M2 Memasang bekisting untuk sloof 179,900.00
34 1 M2 Memasang bekisting untuk kolom 383,700.00
35 1 M2 Memasang bekisting untuk balok 401,000.00
36 1 M2 Memasang bekisting untuk plat lantai 383,700.00
37 1 M2 Memasang bekisting untuk tangga 338,600.00
38 1 M3 Membuat Kolom KP 15/15, Beton K-175 9,370,200.00
39 1 M3 Membuat Balok Lintle 15/20, Beton K-175 8,114,100.00
40 1 M3 Membuat Plat Lantai beton K-300, tebal = 15 cm 3,591,600.00
41 1 M3 Membuat Plat beton K-250, tebal = 15 cm 3,475,800.00
ANALISA HARGA
SATUAN PEKERJAAN
Pekerjaan : Pembangunan Politeknik KP Pangandaran
Lokasi : Pangandaran - Jawa Barat
Thn Anggaran : 2018

HARGA SATUAN JUMLAH HARGA


NO URAIAN PEKERJAAN INDEKS SATUAN
(Rp) (Rp)

1 1 m2 Pembuatan kantor sementara, dengan lantai plesteran


Bahan
Dolken kayu Ø 8-10/400 cm 1.250 Btg 26,750.00 33,437.50
Kayu albasiah 0.120 M3 2,448,000.00 293,760.00
Paku biasa 0.850 Kg 13,250.00 11,262.50
Besi strip 1.100 Kg 17,000.00 18,700.00
Semen portland 30.000 Kg 1,333.33 40,000.00
Pasir pasang 0.150 M3 188,523.81 28,278.57
Pasir beton 0.100 M3 224,523.81 22,452.38
Koral beton 0.150 M3 283,333.33 42,500.00
Bata merah 30.000 Bh 800.00 24,000.00
Seng plat 0.250 Lbr 73,825.00 18,456.25
Jendela nako 2.000 Bh 25,000.00 50,000.00
Kaca polos 0.080 M2 85,450.00 6,836.00
Kunci tanam 0.150 Bh 118,750.00 17,812.50
Plywood 4 mm 0.060 Lbr 86,000.00 5,160.00
Jumlah Bahan 612,655.70
Tenaga kerja
Tukang kayu 1.000 Oh 63,800.00 63,800.00
Tukang batu 1.000 Oh 63,800.00 63,800.00
Pekerja 2.000 Oh 51,000.00 102,000.00
Kepala tukang 0.300 Oh 76,600.00 22,980.00
Mandor 0.050 Oh 89,300.00 4,465.00
Jumlah Upah 257,045.00
Jumlah Bahan + Upah 869,700.70
Keuntungan + Overhead 86,970.07
Jumlah 956,670.77
Dibulatkan 956,600.00
2
2 1m Pembuatan gudang dan alat-alat sementara, dengan lantai plesteran
Bahan
Dolken kayu dia. 8 - 10/400 cm 1.250 btg 26,750.00 33,437.50
Kayu kelas III 0.186 m3 2,448,000.00 455,328.00
Semen portland 0.210 zak 1,333.33 280.00
Pasir beton 0.030 m3 224,523.81 6,735.71
Paku 0.300 kg 13,500.00 4,050.00
Seng gelombang 1.500 lbr 67,500.00 101,250.00
Jumlah Bahan 601,081.21
Tenaga kerja
Tukang kayu 2.000 Oh 63,800.00 127,600.00
Pekerja 1.000 Oh 51,000.00 51,000.00
Kepala tukang 0.200 Oh 76,600.00 15,320.00
Mandor 0.050 Oh 89,300.00 4,465.00
Jumlah Upah 198,385.00
Jumlah Bahan + Upah 799,466.21
Keuntungan + Overhead 79,946.62
Jumlah 879,412.84
Dibulatkan 879,400.00
3 1 m1 Pagar sementara dari seng gelombang tinggi 2m
Bahan
Dolken kayu dia. 8-10/400 cm 1.250 btg 26,750.00 33,437.50
Semen portland 2.500 kg 1,333.33 3,333.33

129
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Seng Gelombang 1.200 lbr 67,500.00 81,000.00


Pasir beton 0.005 m³ 224,523.81 1,122.62
Koral beton 0.009 m³ 175,000.00 1,575.00
Kayu 5/7 0.072 m³ 2,448,000.00 176,256.00
Paku biasa 0.060 kg 13,500.00 810.00
Meni Besi 0.450 ltr 21,720.00 9,774.00
Jumlah Bahan 307,308.45
Tenaga kerja
Pekerja 0.400 Oh 51,000.00 20,400.00
Tukang kayu 0.200 Oh 63,800.00 12,760.00
Kepala tukang 0.020 Oh 76,600.00 1,532.00
Mandor 0.020 Oh 89,300.00 1,786.00
Jumlah Upah 36,478.00
Jumlah Bahan + Upah 343,786.45
Keuntungan + Overhead 34,378.65
Jumlah 378,165.10
Dibulatkan 378,100.00
4 1 bh Memasang Papan Nama Proyek 80x120 cm
Bahan
Kayu Meranti 0.035 Btg 4,530,600.00 158,571.00
Paku Biasa 2"-5" 0.600 Kg 13,250.00 7,950.00
Printing digital 1.152 M2 45,000.00 51,840.00
Cat kayu 1.500 Kg 21,720.00 32,580.00
Semen Portland 16.800 Kg 1,333.33 22,400.00
Pasir Beton 0.027 M³ 224,523.81 6,062.14
Koral Beton 0.041 M³ 175,000.00 7,175.00
Jumlah Bahan 286,578.14
Tenaga kerja
Tukang Kayu 1.000 Oh 63,800.00 63,800.00
Tukang Batu 0.018 Oh 63,800.00 1,148.40
Tukang Cat 1.000 Oh 63,800.00 63,800.00
Pekerja 1.000 Oh 51,000.00 51,000.00
Mandor 0.500 Oh 89,300.00 44,650.00
Jumlah Upah 224,398.40
Jumlah Bahan + Upah 510,976.54
Keuntungan + Overhead 51,097.65
Jumlah 562,074.20
Dibulatkan 562,000.00
5 1 m1 Pengukuran dan pemasangan bouwplank
Bahan
Dolken kayu dia. 6 - 8/400 cm 0.007 btg 57,500.00 402.50
Paku 0.020 kg 13,250.00 265.00
Papan kayu kelas III 0.007 m3 2,448,000.00 17,136.00
Jumlah Bahan 17,803.50
Tenaga kerja
Tukang kayu 0.100 Oh 63,800.00 6,380.00
Pekerja 0.100 Oh 51,000.00 5,100.00
Kepala tukang 0.010 Oh 76,600.00 766.00
Mandor 0.005 Oh 89,300.00 446.50
Jumlah Upah 12,692.50
Jumlah Bahan + Upah 30,496.00
Keuntungan + Overhead 3,049.60
Jumlah 33,545.60
Dibulatkan 33,500.00
6 1 m3 Galian tanah biasa sedalam 1 meter
Tenaga kerja

130
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Pekerja 0.750 Oh 51,000.00 38,250.00


Mandor 0.025 Oh 89,300.00 2,232.50
Jumlah 40,482.50
Keuntungan + Overhead 4,048.25
Jumlah 44,530.75
Dibulatkan 44,500.00

7 1 m3 Galian tanah biasa sedalam 2 meter


Tenaga kerja
Pekerja 0.900 Oh 51,000.00 45,900.00
Mandor 0.045 Oh 89,300.00 4,018.50
Jumlah 49,918.50
Keuntungan + Overhead 4,991.85
Jumlah 54,910.35
Dibulatkan 54,900.00

8 1 m3 Urugan kembali (1/3 dari Indeks Pek. Galian 1 m1)


Tenaga kerja
Pekerja 0.250 Oh 51,000.00 12,750.00
Mandor 0.008 Oh 89,300.00 714.40
Jumlah 13,464.40
Keuntungan + Overhead 1,346.44
Jumlah 14,810.84
Dibulatkan 14,800.00
9 1 m3 Urugan pasir padat
Bahan
Pasir 1.200 M3 188,523.81 226,228.57
Jumlah Bahan 226,228.57
Tenaga kerja
Pekerja 0.250 Oh 51,000.00 12,750.00
Mandor 0.025 Oh 89,300.00 2,232.50
Jumlah Upah 14,982.50
Jumlah Bahan + Upah 241,211.07
Keuntungan + Overhead 24121.1071428571
Jumlah 265332.178571429
Dibulatkan 265,300.00

10 1 m3 Urugan sirtu padat untuk peninggian lantai bangunan


Bahan
Sirtu 1.200 M3 163,166.67 195,800.00
Jumlah Bahan 195,800.00
Tenaga kerja
Pekerja 0.250 Oh 51,000.00 12,750.00
Mandor 0.025 Oh 89,300.00 2,232.50
Jumlah Upah 14,982.50
PERALATAN
Mesin Gilas Tiga Roda ( Roda 3 Wheel ) 0.027 Jam 259,000.00 6,941.20
Dump Truck 3.5 - 4 T 0.021 Jam 346,000.00 7,404.40
Jumlah Peralatan 14,345.60
Jumlah Bahan + Upah + Peralatan 225,128.10
Keuntungan + Overhead 22,512.81
Jumlah 247,640.91
Dibulatkan 247,600.00

11 1 m3 Urugan pematangan tanah Cabluk


Bahan
Cabluk 1.200 M3 104,400.00 125,280.00
Jumlah Bahan 125,280.00

131
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Tenaga kerja
Pekerja 0.250 Oh 51,000.00 12,750.00
Mandor 0.025 Oh 89,300.00 2,232.50
Jumlah Upah 14,982.50
PERALATAN
Mesin Gilas Tiga Roda ( Roda 3 Wheel ) 0.027 Jam 259,000.00 6,941.20
Dump Truck 3.5 - 4 T 0.021 Jam 346,000.00 7,404.40
Jumlah Peralatan 14,345.60
Jumlah Bahan + Upah + Peralatan 154,608.10
Keuntungan + Overhead 15,460.81
Jumlah 170,068.91
Dibulatkan 170,000.00

12 1 m3 Pemindahan dan Pemadatan tanah


Bahan

Jumlah Bahan -
Tenaga kerja
Pekerja 0.250 Oh 51,000.00 12,750.00
Mandor 0.025 Oh 89,300.00 2,232.50
Jumlah Upah 14,982.50
PERALATAN
Mesin Gilas Tiga Roda ( Roda 3 Wheel ) 0.027 Jam 259,000.00 6,941.20
Dump Truck 3.5 - 4 T 0.021 Jam 346,000.00 7,404.40
Jumlah Peralatan 14,345.60
Jumlah Bahan + Upah + Peralatan 29,328.10
Keuntungan + Overhead 2,932.81
Jumlah 32,260.91
Dibulatkan 32,200.00

13 1 m3 Pasang pondasi batu belah, 1 Pc : 4 Ps


Bahan
Batu belah 15 cm/20 cm 1.200 M3 187,777.78 225,333.33
Semen portland 163.000 Kg 1,333.33 217,333.33
Pasir pasang 0.520 M3 188,523.81 98,032.38
Jumlah Bahan 540,699.05
Tenaga kerja
Pekerja 1.200 Oh 51,000.00 61,200.00
Tukang batu 0.650 Oh 63,800.00 41,470.00
Kepala tukang 0.065 Oh 76,600.00 4,979.00
Mandor 0.065 Oh 89,300.00 5,804.50
Jumlah Upah 113,453.50
Jumlah Bahan + Upah 654,152.55
Keuntungan + Overhead 65,415.25
Jumlah 719,567.80
Dibulatkan 719,500.00

14 1 m3 Pasang pondasi batu kosong (aanstamping)


Bahan
Batu belah 15 cm/20 cm 1.200 M3 187,777.78 225,333.33
Pasir urug 0.432 M3 160,761.90 69,449.14
Jumlah Bahan 294,782.48
Tenaga kerja
Pekerja 0.700 Oh 51,000.00 35,700.00
Tukang batu 0.300 Oh 63,800.00 19,140.00
Kepala tukang 0.030 Oh 76,600.00 2,298.00
Mandor 0.030 Oh 89,300.00 2,679.00
Jumlah Upah 59,817.00
Jumlah Bahan + Upah 354,599.48
Keuntungan + Overhead 35,459.95
Jumlah 390,059.42
Dibulatkan 390,000.00

15 1 m3 Pasang Rollag bata 1 Pc : 4 Ps

132
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Bahan
Bata Merah 510.000 bh 800.00 408,000.00
Semen portland 160.000 kg 1,333.33 213,333.33
Pasir pasang 0.320 M3 188,523.81 60,327.62
Jumlah Bahan 681,660.95
Tenaga kerja
Pekerja 3.600 Oh 51,000.00 183,600.00
Tukang batu 1.200 Oh 63,800.00 76,560.00
Kepala tukang 0.030 Oh 76,600.00 2,298.00
Mandor 0.030 Oh 89,300.00 2,679.00
Jumlah Upah 265,137.00
Jumlah Bahan + Upah 946,797.95
Keuntungan + Overhead 94,679.80
Jumlah 1,041,477.75
Dibulatkan 1,041,400.00

16 1 m2 Pasangan dinding bata merah ukuran tebal ½ bata, campuran spesi 1 Pc : 3 Ps


Bahan
Bata merah 5 x 11 x 22 cm 70.000 Bh 800.00 56,000.00
Semen portland 14.370 Kg 1,333.33 19,160.00
Pasir pasang 0.040 M3 188,523.81 7,540.95
Jumlah Bahan 82,700.95
Tenaga kerja
Pekerja 0.300 Oh 51,000.00 15,300.00
Tukang batu 0.100 Oh 63,800.00 6,380.00
Kepala tukang 0.010 Oh 76,600.00 766.00
Mandor 0.015 Oh 89,300.00 1,339.50
Jumlah Upah 23,785.50
Jumlah Bahan + Upah 106,486.45
Keuntungan + Overhead 10,648.65
Jumlah 117,135.10
Dibulatkan 117,100.00

17 1 m2 Pasangan dinding bata merah ukuran tebal ½ bata, campuran spesi 1 Pc : 4 Ps


Bahan
Bata merah 5 x 11 x 22 cm 70.000 Bh 800.00 56,000.00
Semen portland 11.500 Kg 1,333.33 15,333.33
Pasir pasang 0.040 M3 188,523.81 7,540.95
Jumlah Bahan 78,874.29
Tenaga kerja
Pekerja 0.300 Oh 51,000.00 15,300.00
Tukang batu 0.100 Oh 63,800.00 6,380.00
Kepala tukang 0.010 Oh 76,600.00 766.00
Mandor 0.015 Oh 89,300.00 1,339.50
Jumlah Upah 23,785.50
Jumlah Bahan + Upah 102,659.79
Keuntungan + Overhead 10,265.98
Jumlah 112,925.76
Dibulatkan 112,900.00

18 1 m2 Plesteran 1 Pc : 3 Ps, tebal 20 mm


Bahan
Semen portland 10.368 Kg 1,333.33 13,824.00
Pasir pasang 0.030 M3 188,523.81 5,655.71
Jumlah Bahan 19,479.71
Tenaga kerja
Pekerja 0.250 Oh 51,000.00 12,750.00

133
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Tukang batu 0.200 Oh 63,800.00 12,760.00


Kepala tukang 0.020 Oh 76,600.00 1,532.00
Mandor 0.013 Oh 89,300.00 1,116.25
Jumlah Upah 28,158.25
Jumlah Bahan + Upah 47,637.96
Keuntungan + Overhead 2,381.90
Jumlah 50,019.86
Dibulatkan 50,000.00

19 1 m2 Plesteran 1 Pc : 5 Ps, tebal 20 mm


Bahan
Semen portland 6.912 Kg 1,333.33 9,216.00
3
Pasir pasang 0.035 M 188,523.81 6,598.33
Jumlah Bahan 15,814.33
Tenaga kerja
Pekerja 0.250 Oh 51,000.00 12,750.00
Tukang batu 0.200 Oh 63,800.00 12,760.00
Kepala tukang 0.020 Oh 76,600.00 1,532.00
Mandor 0.013 Oh 89,300.00 1,116.25
Jumlah Upah 28,158.25
Jumlah Bahan + Upah 43,972.58
Keuntungan + Overhead 2,198.63
Jumlah 46,171.21
Dibulatkan 46,100.00

20 1 m2 Pasangan dinding rooster beton, campuran spesi 1 Pc : 4 Ps


Bahan
Rooster beton 40 x 40 cm 7.000 Bh 32,500.00 227,500.00
Semen portland 14.000 Kg 1,333.33 18,666.67
Pasir pasang 0.032 M3 188,523.81 6,032.76
Jumlah Bahan 252,199.43
Tenaga kerja
Pekerja 0.300 Oh 51,000.00 15,300.00
Tukang batu 0.100 Oh 63,800.00 6,380.00
Kepala tukang 0.010 Oh 76,600.00 766.00
Mandor 0.015 Oh 89,300.00 1,339.50
Jumlah Upah 23,785.50
Jumlah Bahan + Upah 275,984.93
Keuntungan + Overhead 27,598.49
Jumlah 303,583.42
Dibulatkan 303,500.00

21 1 m2 Membuat acian
Bahan
Portland Cement 3.200 Kg 1,333.33 4,266.67
Jumlah Bahan 4,266.67
Tenaga kerja
Pekerja 0.150 Oh 51,000.00 7,650.00
Tukang batu 0.100 Oh 63,800.00 6,380.00
Kepala tukang 0.010 Oh 76,600.00 766.00
Mandor 0.010 Oh 89,300.00 893.00
Jumlah Upah 15,689.00
Jumlah Bahan + Upah 19,955.67
Keuntungan + Overhead 997.78
Jumlah 20,953.45
Dibulatkan 20,900.00

22 1 m2 Pasangan floor hardener

134
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Bahan
floor hardener 5.000 Kg 14,000.00 70,000.00
Jumlah Bahan 70,000.00
Tenaga kerja
Pekerja 0.120 Oh 51,000.00 6,120.00
Tukang batu 0.120 Oh 63,800.00 7,656.00
Kepala tukang 0.012 Oh 76,600.00 919.20
Mandor 0.006 Oh 89,300.00 535.80
Jumlah Upah 15,231.00
Jumlah Bahan + Upah 85,231.00
Keuntungan + Overhead 4,261.55
Jumlah 89,492.55
Dibulatkan 89,400.00

23 1 m2 Memasang listplank ukuran 1,2/30 GRC


Bahan
Papan Superplank GRC 12 mm 1.0000 M1 26,000.00 26,000.00
Paku 7 cm - 10 cm 0.100 Kg 13,500.00 1,350.00
Jumlah Bahan 27,350.00
Tenaga kerja
Pekerja 0.100 Oh 51,000.00 5,100.00
Tukang kayu 0.100 Oh 63,800.00 6,380.00
Kepala tukang 0.020 Oh 76,600.00 1,532.00
Mandor 0.005 Oh 89,300.00 446.50
Jumlah Upah 13,458.50
Jumlah Bahan + Upah 40,808.50
Keuntungan + Overhead 4,080.85
Jumlah 44,889.35
Dibulatkan 44,800.00

24 1 m3 Membuat lantai kerja Beton mutu K-125


Bahan
Semen portland 230.000 Kg 1,333.33 306,666.67
Pasir beton 0.520 m3 224,523.81 116,752.38
Kerikil (maksimum 30 mm) 0.870 m3 175,000.00 152,250.00
Jumlah Bahan 575,669.05
Tenaga kerja
Pekerja 0.700 Oh 51,000.00 35,700.00
Tukang batu 0.150 Oh 63,800.00 9,570.00
Kepala tukang 0.015 Oh 76,600.00 1,149.00
Mandor 0.020 Oh 89,300.00 1,786.00
Jumlah Upah 48,205.00
Jumlah Bahan + Upah 623,874.05
Keuntungan + Overhead 31,193.70
Jumlah 655,067.75
Dibulatkan 655,000.00

25 1 m3 Membuat Beton Ready Mix Mutu K - 175


Bahan
Beton Ready Mix K-175 1.000 m3 967,500.00 967,500.00
Sewa Alat Pompa Beton 1.000 m3 86,000.00 86,000.00
Jumlah Bahan 1,053,500.00
Tenaga kerja
Pekerja 0.700 Oh 51,000.00 35,700.00
Tukang batu 0.150 Oh 63,800.00 9,570.00
Kepala tukang 0.015 Oh 76,600.00 1,149.00
Mandor 0.020 Oh 89,300.00 1,786.00
Jumlah Upah 48,205.00

135
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Jumlah Bahan + Upah 1,101,705.00


Keuntungan + Overhead 110,170.50
Jumlah 1,211,875.50
Dibulatkan 1,211,800.00
26 1 m3 Membuat Beton Ready Mix Mutu K - 250
Bahan
Beton Ready Mix K-250 1.000 m3 1,075,000.00 1,075,000.00
Sewa Alat Pompa Beton 1.000 m3 86,000.00 86,000.00
Jumlah Bahan 1,161,000.00
Tenaga kerja
Pekerja 0.700 Oh 51,000.00 35,700.00
Tukang batu 0.150 Oh 63,800.00 9,570.00
Kepala tukang 0.015 Oh 76,600.00 1,149.00
Mandor 0.020 Oh 89,300.00 1,786.00
Jumlah Upah 48,205.00
Jumlah Bahan + Upah 1,209,205.00
Keuntungan + Overhead 60,460.25
Jumlah 1,269,665.25
Dibulatkan 1,269,600.00

27 1 m3 Membuat Beton Ready Mix Mutu K - 275


Bahan
Beton Ready Mix K-275 1.000 m3 1,120,000.00 1,120,000.00
Sewa Alat Pompa Beton 1.000 m3 86,000.00 86,000.00
Jumlah Bahan 1,206,000.00
Tenaga kerja
Pekerja 0.700 Oh 51,000.00 35,700.00
Tukang batu 0.150 Oh 63,800.00 9,570.00
Kepala tukang 0.015 Oh 76,600.00 1,149.00
Mandor 0.020 Oh 89,300.00 1,786.00
Jumlah Upah 48,205.00
Jumlah Bahan + Upah 1,254,205.00
Keuntungan + Overhead 62,710.25
Jumlah 1,316,915.25
Dibulatkan 1,316,900.00

28 1 m3 Membuat Beton Ready Mix Mutu K - 300


Bahan
Beton Ready Mix K-300 1.000 m3 1,180,000.00 1,180,000.00
Sewa Alat Pompa Beton 1.000 m3 86,000.00 86,000.00
Jumlah Bahan 1,266,000.00
Tenaga kerja
Pekerja 0.700 Oh 51,000.00 35,700.00
Tukang batu 0.150 Oh 63,800.00 9,570.00
Kepala tukang 0.015 Oh 76,600.00 1,149.00
Mandor 0.020 Oh 89,300.00 1,786.00
Jumlah Upah 48,205.00
Jumlah Bahan + Upah 1,314,205.00
Keuntungan + Overhead 65,710.25
Jumlah 1,379,915.25
Dibulatkan 1,379,900.00

29 1 m2 Pembesian dengan Wiremesh M6 2 lapis


Bahan
Wiremesh M6 2 lapis 2.200 M2 18,000.00 39,600.00
Kawat Las 0.200 Kg 43,833.33 8,766.67

136
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Jumlah Bahan 48,366.67


Tenaga kerja
Pekerja 0.0070 Oh 51,000.00 357.00
Tukang besi 0.0070 Oh 63,800.00 446.60
Kepala tukang 0.0007 Oh 76,600.00 53.62
Mandor 0.0004 Oh 89,300.00 35.72
Jumlah Upah 892.94
Jumlah Bahan + Upah 49,259.61
Keuntungan + Overhead 4,925.96
Jumlah 54,185.57
Dibulatkan 54,100.00

30 1 Kg Pembesian dengan besi U 24


Bahan
Besi beton polos 1.050 Kg 9,833.33 10,325.00
Kawat beton 0.015 Kg 17,820.00 267.30
Jumlah Bahan 10,592.30
Tenaga kerja
Pekerja 0.0070 Oh 51,000.00 357.00
Tukang besi 0.0070 Oh 63,800.00 446.60
Kepala tukang 0.0007 Oh 76,600.00 53.62
Mandor 0.0004 Oh 89,300.00 35.72
Jumlah Upah 892.94
Jumlah Bahan + Upah 11,485.24
Keuntungan + Overhead 1,148.52
Jumlah 12,633.76
Dibulatkan 12,600.00

31 1 Kg Pembesian dengan besi U 42


Bahan
Besi beton ulir 1.050 Kg 11,000.00 11,550.00
Kawat beton 0.015 Kg 17,820.00 267.30
Jumlah Bahan 11,817.30
Tenaga kerja
Pekerja 0.0070 Oh 51,000.00 357.00
Tukang besi 0.0070 Oh 63,800.00 446.60
Kepala tukang 0.0007 Oh 76,600.00 53.62
Mandor 0.0004 Oh 89,300.00 35.72
Jumlah Upah 892.94
Jumlah Bahan + Upah 12,710.24
Keuntungan + Overhead 1,271.02
Jumlah 13,981.26
Dibulatkan 13,900.00

32 1 M2 Memasang bekisting untuk pondasi


Bahan
Kayu Terentang 0.040 M3 2,448,000.00 97,920.00
Paku 5 cm - 10 cm 0.300 Kg 13,500.00 4,050.00
Minyak bekisting 0.100 Liter 38,000.00 3,800.00
Jumlah Bahan 105,770.00
Tenaga kerja
Pekerja 0.520 Oh 51,000.00 26,520.00
Tukang kayu 0.260 Oh 63,800.00 16,588.00
Kepala tukang 0.026 Oh 76,600.00 1,991.60
Mandor 0.005 Oh 89,300.00 446.50
Jumlah Upah 45,546.10
Jumlah Bahan + Upah 151,316.10
Keuntungan + Overhead 15,131.61

137
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Jumlah 166,447.71
Dibulatkan 166,400.00

138
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

33 1 M2 Memasang bekisting untuk sloof


Bahan
Kayu Terentang 0.045 M3 2,448,000.00 110,160.00
Paku 5 cm - 10 cm 0.300 Kg 13,500.00 4,050.00
Minyak bekisting 0.100 Liter 38,000.00 3,800.00
Jumlah Bahan 118,010.00
Tenaga kerja
Pekerja 0.520 Oh 51,000.00 26,520.00
Tukang kayu 0.260 Oh 63,800.00 16,588.00
Kepala tukang 0.026 Oh 76,600.00 1,991.60
Mandor 0.005 Oh 89,300.00 446.50
Jumlah Upah 45,546.10
Jumlah Bahan + Upah 163,556.10
Keuntungan + Overhead 16,355.61
Jumlah 179,911.71
Dibulatkan 179,900.00

34 1 M2 Memasang bekisting untuk kolom


Bahan
Kayu Terentang 0.040 M3 2,448,000.00 97,920.00
Paku 5 cm - 12 cm 0.400 Kg 13,500.00 5,400.00
Minyak bekisting 0.200 Liter 38,000.00 7,600.00
Balok kayu kelas II borneo super 0.015 M3 5,245,000.00 78,675.00
Multipleks tebal 9 mm 0.350 Lbr 130,266.67 45,593.33
Dolken kayu galam Ø 8 - 10 cm pjg. 4 m 2.000 Btg 26,750.00 53,500.00
Jumlah Bahan 288,688.33
Tenaga kerja
Pekerja 0.660 Oh 51,000.00 33,660.00
Tukang kayu 0.330 Oh 63,800.00 21,054.00
Kepala tukang 0.033 Oh 76,600.00 2,527.80
Mandor 0.033 Oh 89,300.00 2,946.90
Jumlah Upah 60,188.70
Jumlah Bahan + Upah 348,877.03
Keuntungan + Overhead 34,887.70
Jumlah 383,764.74
Dibulatkan 383,700.00

35 1 M2 Memasang bekisting untuk balok


Bahan
Kayu Terentang 0.040 M3 2,448,000.00 97,920.00
Paku 5 cm - 12 cm 0.400 Kg 13,500.00 5,400.00
Minyak bekisting 0.200 Liter 38,000.00 7,600.00
Balok kayu kelas II borneo super 0.018 M3 5,245,000.00 94,410.00
Multipleks tebal 9 mm 0.350 Lbr 130,266.67 45,593.33
Dolken kayu galam Ø 8 - 10 cm pjg. 4 m 2.000 Btg 26,750.00 53,500.00
Jumlah Bahan 304,423.33
Tenaga kerja
Pekerja 0.660 Oh 51,000.00 33,660.00
Tukang kayu 0.330 Oh 63,800.00 21,054.00
Kepala tukang 0.033 Oh 76,600.00 2,527.80
Mandor 0.033 Oh 89,300.00 2,946.90
Jumlah Upah 60,188.70
Jumlah Bahan + Upah 364,612.03
Keuntungan + Overhead 36,461.20
Jumlah 401,073.24

139
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Dibulatkan 401,000.00

36 1 M2 Memasang bekisting untuk plat lantai


Bahan
Kayu Terentang 0.040 M3 2,448,000.00 97,920.00
Paku 5 cm - 12 cm 0.400 Kg 13,500.00 5,400.00
Minyak bekisting 0.200 Liter 38,000.00 7,600.00
Balok kayu kelas II borneo super 0.015 M3 5,245,000.00 78,675.00
Multipleks tebal 9 mm 0.350 Lbr 130,266.67 45,593.33
Dolken kayu galam Ø 8 - 10 cm pjg. 4 m 2.000 Btg 26,750.00 53,500.00
Jumlah Bahan 288,688.33
Tenaga kerja
Pekerja 0.660 Oh 51,000.00 33,660.00
Tukang kayu 0.330 Oh 63,800.00 21,054.00
Kepala tukang 0.033 Oh 76,600.00 2,527.80
Mandor 0.033 Oh 89,300.00 2,946.90
Jumlah Upah 60,188.70
Jumlah Bahan + Upah 348,877.03
Keuntungan + Overhead 34,887.70
Jumlah 383,764.74
Dibulatkan 383,700.00

37 1 M2 Memasang bekisting untuk tangga


Bahan
Kayu Terentang 0.030 M3 2,448,000.00 73,440.00
Paku 5 cm - 12 cm 0.400 Kg 13,500.00 5,400.00
Minyak bekisting 0.150 Liter 38,000.00 5,700.00
3
Balok kayu kelas II borneo super 0.015 M 5,245,000.00 78,675.00
Multipleks tebal 9 mm 0.350 Lbr 130,266.67 45,593.33
Dolken kayu galam Ø 8 - 10 cm pjg. 4 m 2.000 Btg 26,750.00 53,500.00
Jumlah Bahan 262,308.33
Tenaga kerja
Pekerja 0.660 Oh 51,000.00 33,660.00
Tukang kayu 0.330 Oh 63,800.00 21,054.00
Kepala tukang 0.033 Oh 76,600.00 2,527.80
Mandor 0.033 Oh 89,300.00 2,946.90
Jumlah Upah 60,188.70
Jumlah Bahan + Upah 322,497.03
Keuntungan + Overhead 16,124.85
Jumlah 338,621.89
Dibulatkan 338,600.00

38 1 M3 Membuat Kolom KP 15/15, Beton K-175


Bahan
Beton K-175 1.000 M3 1,211,800.00 1,211,800.00
Besi beton U 24 206.048 Kg 12,600.00 2,596,204.80
Bekisting kolom 2 X pakai 26.667 M2 191,850.00 5,116,000.00
Jumlah 8,924,004.80
Keuntungan + Overhead 446,200.24
Jumlah 9,370,205.04
Dibulatkan 9,370,200.00

39 1 M3 Membuat Balok Lintle 15/20, Beton K-175


Bahan
Beton K-175 1.000 M3 1,211,800.00 1,211,800.00
Besi beton U 24 145.846 Kg 12,600.00 1,837,663.20
Bekisting kolom 2 X pakai 23.333 M2 200,500.00 4,678,333.33

140
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Jumlah 7,727,796.53
Keuntungan + Overhead 386,389.83
Jumlah 8,114,186.36
Dibulatkan 8,114,100.00

40 1 M3 Membuat Plat Lantai beton K-300, tebal = 15 cm


Bahan
Beton K-300 1.000 M3 1,379,900.00 1,379,900.00
Besi beton Ø10 mm - 15 cm 2 lapis 54.800 Kg 13,900.00 761,720.00
Bekisting plat lantai dipakai kembali 50% 6.667 M2 191,850.00 1,279,000.00
Jumlah 3,420,620.00
Keuntungan + Overhead 171,031.00
Jumlah 3,591,651.00
Dibulatkan 3,591,600.00

41 1 M3 Membuat Plat beton K-250, tebal = 15 cm


Bahan
Beton K-250 1.000 M3 1,269,600.00 1,269,600.00
Besi beton Ø10 mm - 15 cm 2 lapis 54.800 Kg 13,900.00 761,720.00
Bekisting plat lantai dipakai kembali 50% 6.667 M2 191,850.00 1,279,000.00
Jumlah 3,310,320.00
Keuntungan + Overhead 165,516.00
Jumlah 3,475,836.00
Dibulatkan 3,475,800.00

42 1 M3 Membuat plat meja beton K-175, tebal = 10 cm


Bahan
Beton K-175 1.000 M3 1,211,800.00 1,211,800.00
Besi beton Ø8 mm - 8 cm 1 lapis 77.063 Kg 13,900.00 1,071,168.75
Bekisting plat lantai dipakai kembali 50% 5.882 M2 191,850.00 1,128,529.41
Jumlah 3,411,498.16
Keuntungan + Overhead 170,574.91
Jumlah 3,582,073.07
Dibulatkan 3,582,000.00

43 1 M2 Membuat plat meja beton lapis granit


Bahan
Beton K-175 0.060 M3 1,211,800.00 72,708.00
Besi beton Ø8 mm - 8 cm 1 lapis 12.844 Kg 13,900.00 178,528.13
Bekisting plat lantai dipakai kembali 50% 0.980 M2 191,850.00 188,088.24
granit 1.000 M2 343,700.00 343,700.00
Jumlah 783,024.36
Keuntungan + Overhead 39,151.22
Jumlah 822,175.58
Dibulatkan 822,100.00

44 1 M2 Membuat plat meja beton lapis keramik


Bahan
Beton K-175 0.060 M3 1,211,800.00 72,708.00
Besi beton Ø8 mm - 8 cm 1 lapis 12.844 Kg 13,900.00 178,528.13
Bekisting plat lantai dipakai kembali 50% 0.980 M2 191,850.00 188,088.24
keramik 1.000 M2 155,800.00 155,800.00
Jumlah 595,124.36
Keuntungan + Overhead 29,756.22
Jumlah 624,880.58
Dibulatkan 624,800.00

141
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

45 1 m2 Pasang Rangka Atap Baja Ringan Zincalume t = 0,75mm


Bahan
Rangka Baja Ringan Zincalume t=0,75mm 1.000 M2 326,700.00 326,700.00
Alat Bantu 0.100 lot 326,700.00 32,670.00
Jumlah Bahan 359,370.00
Tenaga kerja
Pekerja 0.200 Oh 51,000.00 10,200.00
Tukang Besi 0.167 Oh 63,800.00 10,654.60
Kepala tukang 0.007 Oh 76,600.00 536.20
Mandor 0.007 Oh 89,300.00 625.10
Jumlah Upah 22,015.90
Jumlah Bahan + Upah 381,385.90
Keuntungan + Overhead 38,138.59
Jumlah 419,524.49
Dibulatkan 419,500.00

46 1 m2 Pasang atap genteng metal Zinkalum Tekstur Tebal 0,25 mm


Bahan
Genteng metal zincalum tekstur 1.620 Lbr 90,000.00 145,800.00
Paku Skrup 0.020 Kg 18,865.00 377.30
Jumlah Bahan 146,177.30
Tenaga kerja
Pekerja 0.200 Oh 51,000.00 10,200.00
Tukang kayu 0.100 Oh 63,800.00 6,380.00
Kepala tukang 0.010 Oh 76,600.00 766.00
Mandor 0.001 Oh 89,300.00 89.30
Jumlah Upah 17,435.30
Jumlah Bahan + Upah 163,612.60
Keuntungan + Overhead 16,361.26
Jumlah 179,973.86
Dibulatkan 179,900.00
47 1 m1 Pasang Atap Bubungan Metal Roof
Bahan
Genteng Metal Pasir Kwarsa Profil U setara Prima Roof 1.200 lbr 54,000.00 64,800.00
Paku Skrup 0.020 Kg 18,865.00 377.30
Jumlah Bahan 65,177.30
Tenaga kerja
Pekerja 0.100 Oh 51,000.00 5,100.00
Tukang Besi 0.020 Oh 63,800.00 1,276.00
Kepala tukang 0.010 Oh 76,600.00 766.00
Mandor 0.002 Oh 89,300.00 178.60
Jumlah Upah 7,320.60
Jumlah Bahan + Upah 72,497.90
Keuntungan + Overhead 7,249.79
Jumlah 79,747.69
Dibulatkan 79,700.00

48 1 m1 Pasang Talang Air


Bahan
Plat Seng 1.100 lbr 73,825.00 81,207.50
Paku Skrup 0.020 Kg 18,865.00 377.30
Jumlah Bahan 81,584.80
Tenaga kerja
Pekerja 0.100 Oh 51,000.00 5,100.00
Tukang Besi 0.020 Oh 63,800.00 1,276.00
Kepala tukang 0.010 Oh 76,600.00 766.00
Mandor 0.002 Oh 89,300.00 178.60

142
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Jumlah Upah 7,320.60


Jumlah Bahan + Upah 88,905.40
Keuntungan + Overhead 8,890.54
Jumlah 97,795.94
Dibulatkan 97,700.00

49 1 m2 Memasang Curtain Wall Kaca Polos T = 8 mm


Bahan
Rangka Alumunium back mulion 2.000 M1 150,000.00 300,000.00
1
Glazing gasket 4.000 M 5,000.00 20,000.00
Sealen 0.250 tube 11,000.00 2,750.00
Sekrup 0.200 kg 18,865.00 3,773.00
Braket mullion 1.000 bh 7,500.00 7,500.00
Kaca Polos 8 mm 1.000 M2 211,100.00 211,100.00
Sewa scafolding + bongkar pasang 1.000 ls 15,000.00 15,000.00
Jumlah Bahan 560,123.00
Tenaga kerja
Upah Pasang 1.000 Ls 27,256.15 27,256.15
Jumlah Upah 27,256.15
Jumlah Bahan + Upah 587,379.15
Keuntungan + Overhead 58,737.92
Jumlah 646,117.07
Dibulatkan 646,100.00

50 1 m2 Memasang langit - langit gypsum board 9 mm + rangka Metal Furing


Bahan
Metal Furring 3.000 M1 13,770.00 41,310.00
Gypsum board 0.353 Lbr 69,250.00 24,445.25
Paku skrup 0.100 Kg 18,865.00 1,886.50
Stegger werk 0.100 Lot 67,641.75 6,764.18
Jumlah Bahan 67,641.75
Tenaga kerja
Pekerja 0.250 Oh 51,000.00 12,750.00
Tukang kayu 0.100 Oh 63,800.00 6,380.00
Kepala tukang 0.010 Oh 76,600.00 766.00
Mandor 0.010 Oh 89,300.00 893.00
Jumlah Upah 20,789.00
Jumlah Bahan + Upah 91,812.84
Keuntungan + Overhead 9,181.28
Jumlah 100,994.12
Dibulatkan 100,900.00

51 1 m1 Memasang list plafond gypsum board


Bahan
List gypsum profil 1.050 M1 17,000.00 17,850.00
Tepung gypsum 0.150 Kg 6,312.50 946.88
Jumlah Bahan 18,796.88
Tenaga kerja
Pekerja 0.045 Oh 51,000.00 2,295.00
Tukang kayu 0.045 Oh 63,800.00 2,871.00
Kepala tukang 0.005 Oh 76,600.00 344.70
Mandor 0.002 Oh 89,300.00 200.93
Jumlah Upah 5,711.63
Jumlah Bahan + Upah 24,508.50
Keuntungan + Overhead 2,450.85
Jumlah 26,959.35

143
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Dibulatkan 26,900.00

52 1 m2 Memasang langit - langit GRC t =4 mm + rangka hollow 4/4 cm


Bahan
Hollow 4/4 cm 3.000 M1 22,160.00 66,480.00
GRC board 0.364 Lbr 59,500.00 21,658.00
Paku skrup 0.110 Kg 18,865.00 2,075.15
Stegger werk 0.100 Lot 90,213.15 9,021.32
Jumlah Bahan 90,213.15
Tenaga kerja
Pekerja 0.250 Oh 51,000.00 12,750.00
Tukang kayu 0.100 Oh 63,800.00 6,380.00
Kepala tukang 0.010 Oh 76,600.00 766.00
Mandor 0.010 Oh 89,300.00 893.00
Jumlah Upah 20,789.00
Jumlah Bahan + Upah 115,512.81
Keuntungan + Overhead 11,551.28
Jumlah 127,064.09
Dibulatkan 127,000.00

53 1 m2 Pas. Partisi Gypsum dua muka


Bahan
Metal Furring 3.000 M1 13,770.00 41,310.00
Gypsum board 0.728 Lbr 69,250.00 50,414.00
Kayu Solid 1.000 M1 70,000.00 70,000.00
Paku skrup 0.220 Kg 18,865.00 4,150.30
Jumlah Bahan 165,874.30
Tenaga kerja
Pekerja 0.250 Oh 51,000.00 12,750.00
Tukang besi 0.150 Oh 63,800.00 9,570.00
Kepala tukang 0.010 Oh 76,600.00 766.00
Mandor 0.010 Oh 89,300.00 893.00
Jumlah Upah 23,979.00
Jumlah Bahan + Upah 189,853.30
Keuntungan + Overhead 18,985.33
Jumlah 208,838.63
Dibulatkan 208,800.00
54 1 m2 Memasang Partisi Frame Metal Furring Gypsumboard 9mm dua muka
Bahan
Metal Furring 3.000 M1 13,770.00 41,310.00
Gypsum board 0.728 Lbr 69,250.00 50,414.00
Paku skrup 0.220 Kg 18,865.00 4,150.30
Stegger werk 0.100 Lot 95,874.30 9,587.43
Jumlah Bahan 95,874.30
Tenaga kerja
Pekerja 0.250 Oh 51,000.00 12,750.00
Tukang besi 0.150 Oh 63,800.00 9,570.00
Kepala tukang 0.010 Oh 76,600.00 766.00
Mandor 0.010 Oh 89,300.00 893.00
Jumlah Upah 23,979.00
Jumlah Bahan + Upah 124,647.02
Keuntungan + Overhead 12,464.70
Jumlah 137,111.72
Dibulatkan 137,100.00

55 1 Unit Memasang bak mandi lapis keramik KM/WC pria

144
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Bahan
Pas. Bata merah 2.400 M2 117,100.00 281,040.00
Pas. Keramik dinding 4.000 M2 512,500.00 2,050,000.00
Pas. Keramik lantai 0.330 M2 166,800.00 55,044.00
Jumlah 2,386,084.00
Keuntungan + Overhead 238,608.40
Total 2,624,692.40
Dibulatkan 2,624,600.00
56 1 Unit Memasang bak mandi lapis keramik KM/WC wanita
Bahan
bak mandi fiber 1.000 bh 338,750.00 338,750.00
Pas. Bata merah 1.200 M2 117,100.00 140,520.00
Pas. Keramik dinding 2.000 M2 512,500.00 1,025,000.00
Pas. Keramik lantai 1.900 M2 166,800.00 316,920.00
Jumlah 1,821,190.00
Keuntungan + Overhead 182,119.00
Total 2,003,309.00
Dibulatkan 2,003,300.00
57 1 Unit Memasang kloset duduk / monoblok
Bahan
Kloset duduk/monoblok 1.000 Bh 1,200,000.00 1,200,000.00
Jet washer 1.000 Bh 260,000.00
T Joint 1.000 bh 70,000.00
Perlengkapan 1.000 Ls 54,000.00 54,000.00
Jumlah Bahan 1,254,000.00
Tenaga kerja
Pekerja 0.100 Oh 51,000.00 5,100.00
Tukang batu 0.100 Oh 63,800.00 6,380.00
Kepala tukang 0.010 Oh 76,600.00 766.00
Mandor 0.005 Oh 89,300.00 446.50
Jumlah Upah 12,692.50
Jumlah Bahan + Upah 1,266,692.50
Keuntungan + Overhead 126,669.25
Jumlah 1,393,361.75
Dibulatkan 1,393,300.00

58 1 Unit Memasang kloset Jongkok


Bahan
Kloset Jongkok 1.000 Bh 263,000.00 263,000.00
Perlengkapan 1.000 Ls 11,835.00 11,835.00
Jumlah Bahan 274,835.00
Tenaga kerja
Pekerja 0.100 Oh 51,000.00 5,100.00
Tukang batu 0.100 Oh 63,800.00 6,380.00
Kepala tukang 0.010 Oh 76,600.00 766.00
Mandor 0.005 Oh 89,300.00 446.50
Jumlah Upah 12,692.50
Jumlah Bahan + Upah 287,527.50
Keuntungan + Overhead 28,752.75
Jumlah 316,280.25
Dibulatkan 316,200.00
59 1 Unit Memasang jet washer
Bahan
jet washer 1.000 Bh 260,000.00 260,000.00
Perlengkapan 1.000 Ls 11,700.00 11,700.00
Jumlah Bahan 271,700.00

145
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Tenaga kerja
Pekerja 0.100 Oh 51,000.00 5,100.00
Tukang batu 0.100 Oh 63,800.00 6,380.00
Kepala tukang 0.010 Oh 76,600.00 766.00
Mandor 0.005 Oh 89,300.00 446.50
Jumlah Upah 12,692.50
Jumlah Bahan + Upah 284,392.50
Keuntungan + Overhead 28,439.25
Jumlah 312,831.75
Dibulatkan 312,800.00

60 1 Unit Memasang tempat tisue


Bahan
tempat tisue 1.000 Bh 456,000.00 456,000.00
Perlengkapan 1.000 Ls 20,520.00 20,520.00
Jumlah Bahan 476,520.00
Tenaga kerja
Pekerja 0.100 Oh 51,000.00 5,100.00
Tukang batu 0.100 Oh 63,800.00 6,380.00
Kepala tukang 0.010 Oh 76,600.00 766.00
Mandor 0.005 Oh 89,300.00 446.50
Jumlah Upah 12,692.50
Jumlah Bahan + Upah 489,212.50
Keuntungan + Overhead 48,921.25
Jumlah 538,133.75
Dibulatkan 538,100.00

61 1 Unit Memasang gantungan baju


Bahan
gantungan baju 1.000 Bh 300,800.00 300,800.00
Perlengkapan 1.000 Ls 13,536.00 13,536.00
Jumlah Bahan 314,336.00
Tenaga kerja
Pekerja 0.100 Oh 51,000.00 5,100.00
Tukang batu 0.100 Oh 63,800.00 6,380.00
Kepala tukang 0.010 Oh 76,600.00 766.00
Mandor 0.005 Oh 89,300.00 446.50
Jumlah Upah 12,692.50
Jumlah Bahan + Upah 327,028.50
Keuntungan + Overhead 32,702.85
Jumlah 359,731.35
Dibulatkan 359,700.00

62 1 Unit Memasang wastafel


Bahan
Wastafel + kran 1.000 Bh 1,600,000.00 1,600,000.00
Perlengkapan 1.000 Ls 400,000.00 400,000.00
Semen abu - abu 6.000 Kg 1,333.33 8,000.00
Pasir pasang 0.010 M3 188,523.81 1,885.24
Jumlah Bahan 2,009,885.24
Tenaga kerja
Pekerja 1.200 Oh 51,000.00 61,200.00
Tukang batu 1.450 Oh 63,800.00 92,510.00
Kepala tukang 0.150 Oh 76,600.00 11,490.00
Mandor 0.100 Oh 89,300.00 8,930.00
Jumlah Upah 174,130.00

146
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Jumlah Bahan + Upah 2,184,015.24


Keuntungan + Overhead 218,401.52
Jumlah 2,402,416.76
Dibulatkan 2,402,400.00
63 1 Bh Memasang 1 buah bak cuci piring stainless steel lengkap
Bahan
Bak cuci stainless steel 1.000 Bh 278,250.00 278,250.00
Water drain + asesories 1.000 Set 330,000.00 330,000.00
Kran Angsa 1.000 bh 284,000.00 284,000.00
Jumlah Bahan 892,250.00
Tenaga kerja
Pekerja 0.025 Oh 51,000.00 1,275.00
Tukang batu 0.250 Oh 63,800.00 15,950.00
Kepala tukang 0.025 Oh 76,600.00 1,915.00
Mandor 0.0015 Oh 89,300.00 133.95
Jumlah Upah 19,273.95
Jumlah Bahan + Upah 911,523.95
Keuntungan + Overhead 91,152.40
Jumlah 1,002,676.35
Dibulatkan 1,002,600.00

64 1 Unit Memasang bak mandi fiber


Bahan
bak mandi fiber 1.000 Bh 338,750.00 338,750.00
Perlengkapan 1.000 Ls 33,875.00 33,875.00
Semen abu - abu 6.000 Kg 1,333.33 8,000.00
3
Pasir pasang 0.010 M 188,523.81 1,885.24
Jumlah Bahan 382,510.24
Tenaga kerja
Pekerja 1.200 Oh 51,000.00 61,200.00
Tukang batu 1.450 Oh 63,800.00 92,510.00
Kepala tukang 0.150 Oh 76,600.00 11,490.00
Mandor 0.100 Oh 89,300.00 8,930.00
Jumlah Upah 174,130.00
Jumlah Bahan + Upah 556,640.24
Keuntungan + Overhead 55,664.02
Jumlah 612,304.26
Dibulatkan 612,300.00
65 1 M1 Memasang pipa PVC tipe AW diameter ½"
Bahan
Pipa PVC 1.200 M1 5,656.67 6,788.00
Aksesories 1.000 Ls 1,357.60 1,357.60
Alat Bantu 1.000 Ls 1,131.33 1,131.33
Jumlah Bahan 9,276.93
Tenaga kerja
Pekerja 0.036 Oh 51,000.00 1,836.00
Tukang batu 0.060 Oh 63,800.00 3,828.00
Kepala tukang 0.006 Oh 76,600.00 459.60
Mandor 0.0018 Oh 89,300.00 160.74
Jumlah Upah 6,284.34
Jumlah Bahan + Upah 15,561.27
Keuntungan + Overhead 1,556.13
Jumlah 17,117.40
Dibulatkan 17,100.00

66 1 M1 Memasang pipa PVC tipe AW diameter ¾"

147
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Bahan
Pipa PVC 1.200 M1 8,266.67 9,920.00
Aksesories 1.000 Ls 1,984.00 1,984.00
Alat Bantu 1.000 Ls 1,653.33 1,653.33
Jumlah Bahan 13,557.33
Tenaga kerja
Pekerja 0.036 Oh 51,000.00 1,836.00
Tukang batu 0.060 Oh 63,800.00 3,828.00
Kepala tukang 0.006 Oh 76,600.00 459.60
Mandor 0.0018 Oh 89,300.00 160.74
Jumlah Upah 6,284.34
Jumlah Bahan + Upah 19,841.67
Keuntungan + Overhead 1,984.17
Jumlah 21,825.84
Dibulatkan 21,800.00

67 1 M1 Memasang pipa PVC tipe AW diameter 1½"


Bahan
Pipa PVC 1.200 M1 18,241.67 21,890.00
Aksesories 1.000 Ls 4,378.00 4,378.00
Alat Bantu 1.000 Ls 1,824.17 1,824.17
Jumlah Bahan 28,092.17
Tenaga kerja
Pekerja 0.036 Oh 51,000.00 1,836.00
Tukang batu 0.060 Oh 63,800.00 3,828.00
Kepala tukang 0.006 Oh 76,600.00 459.60
Mandor 0.0018 Oh 89,300.00 160.74
Jumlah Upah 6,284.34
Jumlah Bahan + Upah 34,376.51
Keuntungan + Overhead 3,437.65
Jumlah 37,814.16
Dibulatkan 37,800.00

68 1 M1 Memasang pipa PVC tipe AW diameter 2"


Bahan
Pipa PVC 1.200 M1 28,361.67 34,034.00
Aksesories 1.000 Ls 6,806.80 6,806.80
Alat Bantu 1.000 Ls 2,836.17 2,836.17
Jumlah Bahan 43,676.97
Tenaga kerja
Pekerja 0.054 Oh 51,000.00 2,754.00
Tukang batu 0.090 Oh 63,800.00 5,742.00
Kepala tukang 0.009 Oh 76,600.00 689.40
Mandor 0.0027 Oh 89,300.00 241.11
Jumlah Upah 9,426.51
Jumlah Bahan + Upah 53,103.48
Keuntungan + Overhead 5,310.35
Jumlah 58,413.82
Dibulatkan 58,400.00

69 1 M1 Memasang pipa PVC tipe AW diameter 4"


Bahan
Pipa PVC 1.200 M1 42,110.00 50,532.00
Aksesories 1.000 Ls 10,106.40 10,106.40
Alat Bantu 1.000 Ls 4,211.00 4,211.00
Jumlah Bahan 64,849.40

148
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Tenaga kerja
Pekerja 0.081 Oh 51,000.00 4,131.00
Tukang batu 0.135 Oh 63,800.00 8,613.00
Kepala tukang 0.0135 Oh 76,600.00 1,034.10
Mandor 0.0041 Oh 89,300.00 366.13
Jumlah Upah 14,144.23
Jumlah Bahan + Upah 78,993.63
Keuntungan + Overhead 7,899.36
Jumlah 86,892.99
Dibulatkan 86,800.00
70 1 M1 Memasang pipa PVC tipe AW diameter 6"
Bahan
Pipa PVC 1.200 M1 62,500.00 75,000.00
Aksesories 1.000 Ls 15,000.00 15,000.00
Alat Bantu 1.000 Ls 6,250.00 6,250.00
Jumlah Bahan 96,250.00
Tenaga kerja
Pekerja 0.081 Oh 51,000.00 4,131.00
Tukang batu 0.135 Oh 63,800.00 8,613.00
Kepala tukang 0.0135 Oh 76,600.00 1,034.10
Mandor 0.0041 Oh 89,300.00 366.13
Jumlah Upah 14,144.23
Jumlah Bahan + Upah 110,394.23
Keuntungan + Overhead 11,039.42
Jumlah 121,433.65
Dibulatkan 121,400.00
71 1 Buah Memasang Shower
Bahan
Shower TOTO TX 492 SG 1.000 Bh 863,000.00 863,000.00
Seal tape 0.025 Bh 6,000.00 150.00
Jumlah Bahan 863,150.00
Tenaga kerja
Pekerja 0.010 Oh 51,000.00 510.00
Tukang batu 0.050 Oh 63,800.00 3,190.00
Kepala tukang 0.010 Oh 76,600.00 766.00
Mandor 0.0050 Oh 89,300.00 446.50
Jumlah Upah 4,912.50
Jumlah Bahan + Upah 868,062.50
Keuntungan + Overhead 86,806.25
Jumlah 954,868.75
Dibulatkan 954,800.00

72 1 Buah Memasang kran tembok diameter ¾" atau ½"


Bahan
Kran air 1.000 Bh 150,000.00 150,000.00
Seal tape 0.025 Bh 6,000.00 150.00
Jumlah Bahan 150,150.00
Tenaga kerja
Pekerja 0.010 Oh 51,000.00 510.00
Tukang batu 0.050 Oh 63,800.00 3,190.00
Kepala tukang 0.010 Oh 76,600.00 766.00
Mandor 0.0050 Oh 89,300.00 446.50
Jumlah Upah 4,912.50
Jumlah Bahan + Upah 155,062.50
Keuntungan + Overhead 15,506.25
Jumlah 170,568.75

149
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Dibulatkan 170,500.00

73 1 Buah Memasang kran Angsa


Bahan
Kran air 1.000 Bh 250,000.00 250,000.00
Seal tape 0.025 Bh 6,000.00 150.00
Jumlah Bahan 250,150.00
Tenaga kerja
Pekerja 0.010 Oh 51,000.00 510.00
Tukang batu 0.100 Oh 63,800.00 6,380.00
Kepala tukang 0.010 Oh 76,600.00 766.00
Mandor 0.0050 Oh 89,300.00 446.50
Jumlah Upah 8,102.50
Jumlah Bahan + Upah 258,252.50
Keuntungan + Overhead 25,825.25
Jumlah 284,077.75
Dibulatkan 284,000.00

74 1 Buah Memasang tempat sabun


Bahan
tempat sabun 1.000 Bh 80,000.00 80,000.00
Jumlah Bahan 80,000.00
Tenaga kerja
Pekerja 0.010 Oh 51,000.00 510.00
Tukang batu 0.100 Oh 63,800.00 6,380.00
Kepala tukang 0.010 Oh 76,600.00 766.00
Mandor 0.0050 Oh 89,300.00 446.50
Jumlah Upah 8,102.50
Jumlah Bahan + Upah 88,102.50
Keuntungan + Overhead 8,810.25
Jumlah 96,912.75
Dibulatkan 96,900.00

75 1 Buah Memasang floor drain


Bahan
Floor drain 1.000 Bh 385,000.00 385,000.00
Jumlah Bahan 385,000.00
Tenaga kerja
Pekerja 0.010 Oh 51,000.00 510.00
Tukang batu 0.100 Oh 63,800.00 6,380.00
Kepala tukang 0.010 Oh 76,600.00 766.00
Mandor 0.0050 Oh 89,300.00 446.50
Jumlah Upah 8,102.50
Jumlah Bahan + Upah 393,102.50
Keuntungan + Overhead 39,310.25
Jumlah 432,412.75
Dibulatkan 432,400.00

76 1 Buah Memasang roof drain


Bahan
Roof drain 1.000 Bh 187,500.00 187,500.00
Jumlah Bahan 187,500.00
Tenaga kerja
Pekerja 0.010 Oh 51,000.00 510.00
Tukang batu 0.100 Oh 63,800.00 6,380.00
Kepala tukang 0.010 Oh 76,600.00 766.00
Mandor 0.0050 Oh 89,300.00 446.50

150
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Jumlah Upah 8,102.50


Jumlah Bahan + Upah 195,602.50
Keuntungan + Overhead 19,560.25
Jumlah 215,162.75
Dibulatkan 215,100.00
77 1 Bh Pasang kunci silinder 2 slaag
Bahan
Kunci silinder 1.000 Bh 108,500.00 108,500.00
Jumlah Bahan 108,500.00
Tenaga kerja
Pekerja 0.005 Oh 51,000.00 255.00
Tukang kayu 0.500 Oh 63,800.00 31,900.00
Kepala tukang 0.005 Oh 76,600.00 383.00
Mandor 0.0025 Oh 89,300.00 223.25
Jumlah Upah 32,761.25
Jumlah Bahan + Upah 141,261.25
Dibulatkan 141,200.00

78 1 Bh Pasang engsel pintu


Bahan
Engsel pintu 1.000 Bh 18,750.00 18,750.00
Jumlah Bahan 18,750.00
Tenaga kerja
Pekerja 0.015 Oh 51,000.00 765.00
Tukang kayu 0.150 Oh 63,800.00 9,570.00
Kepala tukang 0.015 Oh 76,600.00 1,149.00
Mandor 0.00075 Oh 89,300.00 66.98
Jumlah Upah 11,550.98
Jumlah Bahan + Upah 30,300.98
Keuntungan + Overhead 3,030.10
Jumlah 33,331.07
Dibulatkan 33,300.00

79 1 Bh Pasang kunci selot


Bahan
Kunci selot 1.000 Bh 30,000.00 30,000.00
Jumlah Bahan 30,000.00
Tenaga kerja
Pekerja 0.020 Oh 51,000.00 1,020.00
Tukang kayu 0.200 Oh 63,800.00 12,760.00
Kepala tukang 0.020 Oh 76,600.00 1,532.00
Mandor 0.001 Oh 89,300.00 89.30
Jumlah Upah 15,401.30
Jumlah Bahan + Upah 45,401.30
Keuntungan + Overhead 4,540.13
Jumlah 49,941.43
Dibulatkan 49,900.00

80 1 Bh Pasang pegangan pintu / door holder biasa


Bahan
Door holder biasa 1.000 Bh 112,500.00 112,500.00
Jumlah Bahan 112,500.00
Tenaga kerja
Pekerja 0.050 Oh 51,000.00 2,550.00
Tukang kayu 0.500 Oh 63,800.00 31,900.00
Kepala tukang 0.050 Oh 76,600.00 3,830.00

151
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Mandor 0.0025 Oh 89,300.00 223.25


Jumlah Upah 38,503.25
Jumlah Bahan + Upah 151,003.25
Keuntungan + Overhead 15,100.33
Jumlah 166,103.58
Dibulatkan 166,100.00

81 1 Bh Pasang Engsel pintu (floor hinge)


Bahan
Engsel Pintu (floor Hinge), Ex Dorma, Uk. Pintu Standar 1.000 bh 1,420,000.00 1,420,000.00
Assesories (Fixed top pin, top patch fitting, bottom patch fiting, 0.150 lot 1,420,000.00 213,000.00
bottom lock fiting)
Jumlah Bahan 1,633,000.00
Tenaga kerja
Pekerja 0.050 Oh 51,000.00 2,550.00
Tukang kayu 0.500 Oh 63,800.00 31,900.00
Kepala tukang 0.050 Oh 76,600.00 3,830.00
Mandor 0.0025 Oh 89,300.00 223.25
Jumlah Upah 38,503.25
Jumlah Bahan + Upah 1,671,503.25
Keuntungan + Overhead 167,150.33
Jumlah 1,838,653.58
Dibulatkan 1,838,600.00

82 1 Bh Kunci swing jendela


Bahan
Kunci swing jendela 1.000 Bh 25,000.00 25,000.00
Jumlah Bahan 25,000.00
Tenaga kerja
Pekerja 0.010 Oh 51,000.00 510.00
Tukang kayu 0.100 Oh 63,800.00 6,380.00
Kepala tukang 0.010 Oh 76,600.00 766.00
Mandor 0.0005 Oh 89,300.00 44.65
Jumlah Upah 7,700.65
Jumlah Bahan + Upah 32,700.65
Keuntungan + Overhead 3,270.07
Jumlah 35,970.72
Dibulatkan 35,900.00

83 1 Bh Pasang engsel jendela casment


Bahan
Engsel casment 1.000 Bh 61,300.00 61,300.00
Jumlah Bahan 61,300.00
Tenaga kerja
Pekerja 0.015 Oh 51,000.00 765.00
Tukang kayu 0.150 Oh 63,800.00 9,570.00
Kepala tukang 0.015 Oh 76,600.00 1,149.00
Mandor 0.00075 Oh 89,300.00 66.98
Jumlah Upah 11,550.98
Jumlah Bahan + Upah 72,850.98
Dibulatkan 72,800.00

84 1 M2 Pasang kaca, tebal 5 mm


Bahan
Kaca 1.100 M2 85,450.00 93,995.00
Jumlah Bahan 93,995.00
Tenaga kerja

152
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Pekerja 0.010 Oh 51,000.00 510.00


Tukang kayu 0.100 Oh 63,800.00 6,380.00
Kepala tukang 0.010 Oh 76,600.00 766.00
Mandor 0.0075 Oh 89,300.00 669.75
Jumlah Upah 8,325.75
Jumlah Bahan + Upah 102,320.75
Keuntungan + Overhead 10,232.08
Jumlah 112,552.83
Dibulatkan 112,500.00

85 1 M2 Pasang kaca, tebal 5 mm tempered


Bahan
Kaca 1.100 M2 200,000.00 220,000.00
Jumlah Bahan 220,000.00
Tenaga kerja
Pekerja 0.010 Oh 51,000.00 510.00
Tukang kayu 0.100 Oh 63,800.00 6,380.00
Kepala tukang 0.010 Oh 76,600.00 766.00
Mandor 0.0075 Oh 89,300.00 669.75
Jumlah Upah 8,325.75
Jumlah Bahan + Upah 228,325.75
Keuntungan + Overhead 22,832.58
Jumlah 251,158.33
Dibulatkan 251,100.00

86 1 M2 Pasang kaca, tebal 8 mm


Bahan
Kaca 1.100 M2 164,000.00 180,400.00
Jumlah Bahan 180,400.00
Tenaga kerja
Pekerja 0.015 Oh 51,000.00 765.00
Tukang kayu 0.150 Oh 63,800.00 9,570.00
Kepala tukang 0.015 Oh 76,600.00 1,149.00
Mandor 0.00075 Oh 89,300.00 66.98
Jumlah Upah 11,550.98
Jumlah Bahan + Upah 191,950.98
Keuntungan + Overhead 19,195.10
Jumlah 211,146.07
Dibulatkan 211,100.00

87 1 M2 Pasang kaca, tebal 12 mm tempered


Bahan
Kaca 1.100 M2 700,000.00 770,000.00
Jumlah Bahan 770,000.00
Tenaga kerja
Pekerja 0.015 Oh 51,000.00 765.00
Tukang kayu 0.150 Oh 63,800.00 9,570.00
Kepala tukang 0.015 Oh 76,600.00 1,149.00
Mandor 0.00075 Oh 89,300.00 66.98
Jumlah Upah 11,550.98
Jumlah Bahan + Upah 781,550.98
Keuntungan + Overhead 78,155.10
Jumlah 859,706.07
Dibulatkan 859,700.00

88 1 M2 Pasang sunblast sticker kaca


Bahan
Sunblast sticker 1.050 M2 60,000.00 63,000.00
Jumlah Bahan 63,000.00

153
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Tenaga kerja
Pekerja 0.010 Oh 51,000.00 510.00
Tukang kayu 0.100 Oh 63,800.00 6,380.00
Kepala tukang 0.010 Oh 76,600.00 766.00
Mandor 0.001 Oh 89,300.00 89.30
Jumlah Upah 7,745.30
Jumlah Bahan + Upah 70,745.30
Keuntungan + Overhead 7,074.53
Jumlah 77,819.83
Dibulatkan 77,800.00
2
89 1M Pasang kaca tempered, tebal 8 mm
Bahan
Kaca 1.100 M2 700,000.00 770,000.00
Jumlah Bahan 770,000.00
Tenaga kerja
Pekerja 0.015 Oh 51,000.00 765.00
Tukang kayu 0.150 Oh 63,800.00 9,570.00
Kepala tukang 0.015 Oh 76,600.00 1,149.00
Mandor 0.00075 Oh 89,300.00 66.98
Jumlah Upah 11,550.98
Jumlah Bahan + Upah 781,550.98
Dibulatkan 781,500.00

90 1 Unit Pintu tipe P1 Lengkap Terpasang (ASRAMA)


Bahan
Daun pintu rangka kayu kamper double teakwood 1.000 unit 1,250,000.00 1,250,000.00
samarinda fin. Melamik + kaca t. 5mm
Kaca polos 5 mm 0.340 M2 112,500.00 38,272.50
Engsel biasa 3.000 Bh 33,300.00 99,900.00
Handle pintu 1.000 Psg 166,100.00 166,100.00
Kunci pintu 1.000 Bh 141,200.00 141,200.00
Alumunium 4" 6.960 M1 102,000.00 709,920.00
Sealant alumunium ke tembok 14.616 M1 3,000.00 43,848.00
Upah pasang 0.050 Lot 2,449,240.50 122,462.03
Jumlah 2,571,702.53
Keuntungan + Overhead 257,170.25
Jumlah 2,828,872.78
Dibulatkan 2,828,800.00

91 1 Unit Pintu tipe P2 Lengkap Terpasang (ASRAMA)


Bahan
Daun pintu rangka kayu kamper double teakwood 2.000 unit 1,250,000.00 2,500,000.00
samarinda fin. Melamik + kaca t. 5mm
Kaca polos 5 mm 0.672 M2 112,500.00 75,600.00
Engsel biasa 6.000 Bh 33,300.00 199,800.00
Handle pintu 2.000 Psg 166,100.00 332,200.00
Kunci pintu 1.000 Bh 141,200.00 141,200.00
Alumunium 4" 8.400 M1 102,000.00 856,800.00
Slot tanam 2.000 Bh 30,000.00 60,000.00
Sealant alumunium ke tembok 17.640 M1 3,000.00 52,920.00
Upah pasang 0.050 Lot 4,218,520.00 210,926.00
Jumlah 4,429,446.00
Keuntungan + Overhead 442,944.60
Jumlah 4,872,390.60
Dibulatkan 4,872,300.00

92 1 Unit Pintu tipe P3 Lengkap Terpasang (ASRAMA)

154
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Bahan
Daun pintu rangka kayu kamper double teakwood 1.000 unit 1,250,000.00 1,250,000.00
samarinda fin. Melamik + kaca t. 5mm -
Kaca polos 5 mm 0.365 M2 112,500.00 41,107.50
Engsel biasa 3.000 Bh 33,300.00 99,900.00
Handle pintu 1.000 Psg 166,100.00 166,100.00
Kunci pintu 1.000 Bh 141,200.00 141,200.00
Alumunium 4" 6.760 M1 102,000.00 689,520.00
Sealant alumunium ke tembok 14.196 M1 3,000.00 42,588.00
Upah pasang 0.050 Lot 2,430,415.50 121,520.78
Jumlah 2,551,936.28
Keuntungan + Overhead 255,193.63
Jumlah 2,807,129.90
Dibulatkan 2,807,100.00

93 1 Unit Pintu tipe P4 Lengkap Terpasang (ASRAMA)


Bahan
Daun pintu rangka kayu kamper double teakwood 1.000 unit 1,000,000.00 1,000,000.00
samarinda fin. Melamik
Engsel biasa 3.000 Bh 33,300.00 99,900.00
Handle pintu 1.000 Psg 166,100.00 166,100.00
Kunci pintu 1.000 Bh 141,200.00 141,200.00
Alumunium 4" 5.060 M1 102,000.00 516,120.00
Sealant alumunium ke tembok 10.626 M1 3,000.00 31,878.00
Upah pasang 0.050 Lot 1,955,198.00 97,759.90
Jumlah 2,052,957.90
Keuntungan + Overhead 205,295.79
Jumlah 2,258,253.69
Dibulatkan 2,258,200.00

94 1 Unit Pintu tipe P5 Lengkap Terpasang (ASRAMA)


Bahan
Daun pintu rangka kayu kamper depan panil, 1.000 unit 900,000.00 900,000.00
belakang lapis melaminto 3mm
Engsel biasa 3.000 Bh 33,300.00 99,900.00
Handle pintu 1.000 Psg 166,100.00 166,100.00
Kunci pintu 1.000 Bh 141,200.00 141,200.00
1
Alumunium 4" 4.840 M 102,000.00 493,680.00
Sealant alumunium ke tembok 10.164 M1 3,000.00 30,492.00
Upah pasang 0.050 Lot 1,831,372.00 91,568.60
Jumlah 1,922,940.60
Keuntungan + Overhead 192,294.06
Jumlah 2,115,234.66
Dibulatkan 2,115,200.00

95 1 Unit Pintu tipe P6 Lengkap Terpasang (ASRAMA)


Bahan
Daun pintu rangka kayu kamper double teakwood 2.000 unit 1,000,000.00 2,000,000.00
samarinda fin. Melamik
Engsel biasa 6.000 Bh 33,300.00 199,800.00
Handle pintu 2.000 Psg 166,100.00 332,200.00
Kunci pintu 1.000 Bh 141,200.00 141,200.00
Alumunium 4" 4.200 M1 102,000.00 428,400.00
Sealant alumunium ke tembok 8.820 M1 3,000.00 26,460.00
Upah pasang 0.050 Lot 3,128,060.00 156,403.00
Jumlah 3,284,463.00
Keuntungan + Overhead 328,446.30

155
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Jumlah 3,612,909.30
Dibulatkan 3,612,900.00

96 1 Unit Pintu tipe P7 Lengkap Terpasang (ASRAMA)


Bahan
Daun pintu rangka kayu kamper double teakwood 2.000 unit 800,000.00 1,600,000.00
samarinda fin. Melamik
Engsel biasa 6.000 Bh 33,300.00 199,800.00
Handle pintu 2.000 Psg 166,100.00 332,200.00
Kunci pintu 1.000 Bh 141,200.00 141,200.00
1
Alumunium 4" 3.950 M 102,000.00 402,900.00
Sealant alumunium ke tembok 8.295 M1 3,000.00 24,885.00
Upah pasang 0.050 Lot 2,700,985.00 135,049.25
Jumlah 2,836,034.25
Keuntungan + Overhead 283,603.43
Jumlah 3,119,637.68
Dibulatkan 3,119,600.00

97 1 Unit Pintu tipe P8 Lengkap Terpasang (ASRAMA)


Bahan
Daun pintu menggunakan bibir selebar 24mm diisi rockwool 2.000 unit 3,500,000.00 7,000,000.00
Engsel 6.000 Bh 87,500.00 525,000.00
tarikan pintu (panic bar) 2.000 Psg 225,400.00 450,800.00
Kunci pintu 1.000 Bh 141,200.00 141,200.00
door closer 2.000 bh 125,000.00 250,000.00
besi hollow 50 x 100 5.750 M1 189,000.00 1,086,750.00
Sealant alumunium ke tembok 12.075 M1 3,000.00 36,225.00
Upah pasang 0.050 Lot 9,489,975.00 474,498.75
Jumlah 9,964,473.75
Keuntungan + Overhead 996,447.38
Jumlah 10,960,921.13
Dibulatkan 10,960,900.00

98 1 Unit Pintu tipe P9 Lengkap Terpasang (ASRAMA)


Bahan
Daun pintu rangka kayu kamper double teakwood 4.000 Bh 650,000.00 2,600,000.00
samarinda fin. Melamik
Rel atas 2.500 M1 200,000.00 500,000.00
Rel bawah 2.500 M1 150,000.00 375,000.00
Pivot 2.000 Psg 250,000.00 500,000.00
Hanger 2.000 Psg 50,000.00 100,000.00
Roda atas pinggir 2.000 bh 100,000.00 200,000.00
Roda bawah pinggir 2.000 bh 80,000.00 160,000.00
Engsel pintu 12.000 set 33,300.00 399,600.00
Braket 6.000 bh 75,000.00 450,000.00
Baut braket 6.000 bh 9,000.00 54,000.00
Handle pintu 2.000 Psg 166,100.00 332,200.00
Kunci pintu 1.000 Bh 141,200.00 141,200.00
Selot Tanam 4.000 Bh 49,900.00 199,600.00
Alumunium 4" 6.900 M1 102,000.00 703,800.00
Sealant alumunium 14.490 M1 3,000.00 43,470.00
Upah pasang 0.080 Lot 6,758,870.00 540,709.60
Jumlah 7,299,579.60
Keuntungan + Overhead 729,957.96
Jumlah 8,029,537.56
Dibulatkan 8,029,500.00

99 1 Unit Jendela tipe J1 Lengkap Terpasang (ASRAMA)


Bahan

156
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Daun Jendela Rangka Alumunium lapis kaca 5 mm 4.000 unit 500,000.00 2,000,000.00
Kaca polos 5 mm 0.824 M2 112,500.00 92,711.25
Engsel Casment 4.000 bh 72,800.00 291,200.00
Alumunium 4" 11.925 M1 102,000.00 1,216,350.00
Sealant alumunium 25.043 M1 3,000.00 75,127.50
Upah pasang 0.030 Lot 1,675,388.75 50,261.66
Jumlah 3,725,650.41
Keuntungan + Overhead 372,565.04
Jumlah 4,098,215.45
Dibulatkan 4,098,200.00

100 1 Unit Jendela tipe J2 Lengkap Terpasang (ASRAMA)


Bahan
Kaca polos 5 mm 1.254 M2 112,500.00 141,120.00
Alumunium 4" 4.800 M1 102,000.00 489,600.00
Sealant alumunium 10.560 M1 3,000.00 31,680.00
Upah pasang 0.030 Lot 662,400.00 19,872.00
Jumlah 682,272.00
Keuntungan + Overhead 68,227.20
Jumlah 750,499.20
Dibulatkan 750,400.00
101 1 Unit Jendela tipe J3 Lengkap Terpasang (ASRAMA)
Bahan
Kaca polos 5 mm 0.270 M2 112,500.00 30,420.00
Alumunium 4" 2.400 M1 102,000.00 244,800.00
Sealant alumunium 5.280 M1 3,000.00 15,840.00
Upah pasang 0.030 Lot 291,060.00 8,731.80
Jumlah 299,791.80
Keuntungan + Overhead 29,979.18
Jumlah 329,770.98
Dibulatkan 329,700.00

102 1 Unit Pintu tipe PJ1 Lengkap Terpasang (REKTORAT)


Bahan
Kaca polos Tempered 12 mm 7.290 M2 859,700.00 6,267,213.00
Pintu frameless (tempered 12 mm) floor hinge dorma BTS 84 2.000 M2 4,500,000.00 9,000,000.00
Handle pintu 2.000 Psg 166,100.00 332,200.00
List Alumunium U 20.190 M1 15,000.00 302,850.00
rangka hollow 86.800 M1 45,000.00 3,906,000.00
MDF tebal 9 mm 11.200 M2 185,000.00 2,072,000.00
HPL 11.200 M2 78,500.00 879,200.00
lem 5.600 kg 37,250.00 208,600.00
Sunblast Sticker 1.835 M2 60,000.00 110,070.00
Sealant alumunium ke tembok 40.380 M1 3,000.00 121,140.00
Karet Kaca 20.190 M1 40,000.00 807,600.00
Upah pasang 0.050 Lot 24,006,873.00 1,200,343.65
Jumlah 25,207,216.65
Keuntungan + Overhead 2,520,721.67
Jumlah 27,727,938.32
Dibulatkan 27,727,900.00

103 1 Unit Pintu tipe PJ2 Lengkap Terpasang (REKTORAT)


Bahan
Kaca polos Tempered 12 mm 13.220 M2 859,700.00 11,365,234.00
Pintu frameless (tempered 12 mm) floor hinge dorma BTS 84 2.000 M2 4,200,000.00 8,400,000.00
Handle pintu 2.000 Psg 166,100.00 332,200.00
List Alumunium U 17.600 M1 15,000.00 264,000.00

157
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Sunblast Sticker 2.500 M2 60,000.00 150,000.00


Sealant alumunium ke tembok 35.200 M1 3,000.00 105,600.00
Karet Kaca 17.600 M1 40,000.00 704,000.00
Upah pasang 0.050 Lot 21,321,034.00 1,066,051.70
Jumlah 22,387,085.70
Keuntungan + Overhead 2,238,708.57
Jumlah 24,625,794.27
Dibulatkan 24,625,700.00

104 1 Unit Pintu tipe P1 Lengkap Terpasang (REKTORAT)


Bahan
Daun pintu rangka kayu kamper double teakwood 2.000 Bh 1,500,000.00 3,000,000.00
samarinda fin. Melamik -
Rel atas 4.000 M1 200,000.00 800,000.00
Rel bawah 4.000 M1 150,000.00 600,000.00
Hanger 2.000 Psg 50,000.00 100,000.00
Roda atas pinggir 2.000 bh 100,000.00 200,000.00
Roda bawah pinggir 2.000 bh 80,000.00 160,000.00
Braket 6.000 bh 75,000.00 450,000.00
Baut braket 6.000 bh 9,000.00 54,000.00
Handle pintu 2.000 Psg 166,100.00 332,200.00
Kunci pintu 1.000 Bh 141,200.00 141,200.00
Selot Tanam 2.000 Bh 49,900.00 99,800.00
Alumunium 4" 6.000 M1 102,000.00 612,000.00
Sealant alumunium 12.600 M1 3,000.00 37,800.00
Upah pasang 0.080 Lot 6,587,000.00 526,960.00
Jumlah 7,113,960.00
Keuntungan + Overhead 711,396.00
Jumlah 7,825,356.00
Dibulatkan 7,825,300.00

105 1 Unit Pintu tipe P2 Lengkap Terpasang (REKTORAT)


Bahan
Daun pintu rangka kayu kamper double teakwood 1.000 unit 1,250,000.00 1,250,000.00
samarinda fin. Melamik + kaca t. 5mm -
Kaca polos 5 mm 0.370 M2 112,500.00 41,580.00
Engsel biasa 3.000 Bh 33,300.00 99,900.00
Handle pintu 1.000 Psg 166,100.00 166,100.00
Kunci pintu 1.000 Bh 141,200.00 141,200.00
Alumunium 4" 6.960 M1 102,000.00 709,920.00
Sealant alumunium ke tembok 14.616 M1 3,000.00 43,848.00
Upah pasang 0.050 Lot 2,452,548.00 122,627.40
Jumlah 2,575,175.40
Keuntungan + Overhead 257,517.54
Jumlah 2,832,692.94
Dibulatkan 2,832,600.00

106 1 Unit Pintu tipe P3 Lengkap Terpasang (REKTORAT)


Bahan
Daun pintu rangka kayu kamper double teakwood 2.000 unit 1,250,000.00 2,500,000.00
samarinda fin. Melamik + kaca t. 5mm -
Kaca polos 5 mm 0.714 M2 112,500.00 80,325.00
Engsel biasa 6.000 Bh 33,300.00 199,800.00
Handle pintu 2.000 Psg 166,100.00 332,200.00
Kunci pintu 1.000 Bh 141,200.00 141,200.00
Alumunium 4" 8.600 M1 102,000.00 877,200.00
Slot tanam 2.000 Bh 30,000.00 60,000.00
Sealant alumunium ke tembok 18.060 M1 3,000.00 54,180.00
Upah pasang 0.050 Lot 4,244,905.00 212,245.25

158
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Jumlah 4,457,150.25
Keuntungan + Overhead 445,715.03
Jumlah 4,902,865.28
Dibulatkan 4,902,800.00

107 1 Unit Pintu tipe P4 Lengkap Terpasang (REKTORAT)


Bahan
Daun pintu rangka kayu kamper double teakwood 1.000 unit 1,250,000.00 1,250,000.00
samarinda fin. Melamik + kaca t. 5mm -
Kaca polos 5 mm 0.370 M2 112,500.00 41,580.00
Engsel biasa 3.000 Bh 33,300.00 99,900.00
Handle pintu 1.000 Psg 166,100.00 166,100.00
Kunci pintu 1.000 Bh 141,200.00 141,200.00
Alumunium 4" 6.960 M1 102,000.00 709,920.00
Sealant alumunium ke tembok 14.616 M1 3,000.00 43,848.00
Upah pasang 0.050 Lot 2,452,548.00 122,627.40
Jumlah 2,575,175.40
Keuntungan + Overhead 257,517.54
Jumlah 2,832,692.94
Dibulatkan 2,832,600.00

108 1 Unit Pintu tipe P5 Lengkap Terpasang (REKTORAT)


Bahan
Daun pintu rangka kayu kamper depan panil, 1.000 unit 900,000.00 900,000.00
belakang lapis melaminto 3mm -
Engsel biasa 3.000 Bh 33,300.00 99,900.00
Handle pintu 1.000 Psg 166,100.00 166,100.00
Kunci pintu 1.000 Bh 141,200.00 141,200.00
1
Alumunium 4" 4.980 M 102,000.00 507,960.00
Sealant alumunium ke tembok 10.458 M1 3,000.00 31,374.00
Upah pasang 0.050 Lot 1,846,534.00 92,326.70
Jumlah 1,938,860.70
Keuntungan + Overhead 193,886.07
Jumlah 2,132,746.77
Dibulatkan 2,132,700.00

109 1 Unit Pintu tipe P6 Lengkap Terpasang (REKTORAT)


Bahan
Daun pintu rangka kayu kamper double teakwood 1.000 unit 1,000,000.00 1,000,000.00
samarinda fin. Melamik -
Engsel biasa 3.000 Bh 33,300.00 99,900.00
Handle pintu 1.000 Psg 166,100.00 166,100.00
Kunci pintu 1.000 Bh 141,200.00 141,200.00
Alumunium 4" 3.780 M1 102,000.00 385,560.00
Sealant alumunium ke tembok 7.938 M1 3,000.00 23,814.00
Upah pasang 0.050 Lot 1,816,574.00 90,828.70
Jumlah 1,907,402.70
Keuntungan + Overhead 190,740.27
Jumlah 2,098,142.97
Dibulatkan 2,098,100.00

110 1 Unit Jendela tipe J1 Lengkap Terpasang (REKTORAT)


Bahan
Daun Jendela Rangka Alumunium lapis kaca 5 mm 2.000 unit 500,000.00 1,000,000.00
Kaca polos 5 mm 0.925 M2 112,500.00 104,017.50
Engsel Casment 2.000 bh 72,800.00 145,600.00
Alumunium 4" 10.500 M1 102,000.00 1,071,000.00

159
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Sealant alumunium 22.050 M1 3,000.00 66,150.00


Upah pasang 0.030 Lot 1,386,767.50 41,603.03
Jumlah 2,428,370.53
Keuntungan + Overhead 242,837.05
Jumlah 2,671,207.58
Dibulatkan 2,671,200.00

111 1 Unit Jendela tipe J2 Lengkap Terpasang (REKTORAT)


Bahan
Kaca polos 5 mm 2.148 M2 112,500.00 241,695.00
Alumunium 4" 7.200 M1 102,000.00 734,400.00
1
Sealant alumunium 15.120 M 3,000.00 45,360.00
Upah pasang 0.030 Lot 1,021,455.00 30,643.65
Jumlah 1,052,098.65
Keuntungan + Overhead 105,209.87
Jumlah 1,157,308.52
Dibulatkan 1,157,300.00

112 1 Unit Jendela tipe J3 Lengkap Terpasang (REKTORAT)


Bahan
Daun Jendela Rangka Alumunium lapis kaca 5 mm 2.000 unit 650,000.00 1,300,000.00
2
Kaca polos 5 mm 1.257 M 112,500.00 141,378.75
Engsel Casment 2.000 bh 72,800.00 145,600.00
Alumunium 4" 10.450 M1 102,000.00 1,065,900.00
Sealant alumunium 21.945 M1 3,000.00 65,835.00
Upah pasang 0.030 Lot 1,418,713.75 42,561.41
Jumlah 2,761,275.16
Keuntungan + Overhead 276,127.52
Jumlah 3,037,402.68
Dibulatkan 3,037,400.00

113 1 Unit Jendela tipe J4 Lengkap Terpasang (REKTORAT)


Bahan
Kaca polos 12 mm tempered 14.040 M2 859,700.00 12,070,188.00
Alumunium 4" 25.400 M1 102,000.00 2,590,800.00
Sealant alumunium 53.340 M1 3,000.00 160,020.00
Upah pasang 0.030 Lot 14,821,008.00 444,630.24
Jumlah 15,265,638.24
Keuntungan + Overhead 1,526,563.82
Jumlah 16,792,202.06
Dibulatkan 16,792,200.00

114 1 Unit Jendela tipe J5 Lengkap Terpasang (REKTORAT)


Bahan
Kaca polos 12 mm tempered 2.970 M2 859,700.00 2,553,309.00
List Alumunium U 7.600 M1 15,000.00 114,000.00
Sealant alumunium ke tembok 7.600 M1 3,000.00 22,800.00
Karet Kaca 7.600 M1 40,000.00 304,000.00
Upah pasang 0.030 Lot 2,553,309.00 76,599.27
Jumlah 3,070,708.27
Keuntungan + Overhead 307,070.83
Jumlah 3,377,779.10
Dibulatkan 3,377,700.00

115 1 Unit Jendela tipe J6 Lengkap Terpasang (REKTORAT)


Bahan
Kaca polos 12 mm tempered 12.420 M2 859,700.00 10,677,474.00
List Alumunium U 14.600 M1 15,000.00 219,000.00

160
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Sealant alumunium ke tembok 22.700 M1 3,000.00 68,100.00


Karet Kaca 14.600 M1 40,000.00 584,000.00
Upah pasang 0.030 Lot 10,677,474.00 320,324.22
Jumlah 11,868,898.22
Keuntungan + Overhead 1,186,889.82
Jumlah 13,055,788.04
Dibulatkan 13,055,700.00

116 1 Unit Jendela tipe J7 Lengkap Terpasang (REKTORAT)


Bahan
Kaca polos 12 mm tempered 15.930 M2 859,700.00 13,695,021.00
1
List Alumunium U 17.200 M 15,000.00 258,000.00
Sealant alumunium ke tembok 30.700 M1 3,000.00 92,100.00
Karet Kaca 17.200 M1 40,000.00 688,000.00
Upah pasang 0.030 Lot 13,695,021.00 410,850.63
Jumlah 15,143,971.63
Keuntungan + Overhead 1,514,397.16
Jumlah 16,658,368.79
Dibulatkan 16,658,300.00

117 1 Unit Pintu tipe P1 Lengkap Terpasang (GD. KULIAH)


Bahan
Daun pintu rangka kayu kamper double teakwood 1.000 unit 1,250,000.00 1,250,000.00
samarinda fin. Melamik + kaca t. 5mm (Besar) -
Daun pintu rangka kayu kamper double teakwood 1.000 unit 750,000.00 750,000.00
samarinda fin. Melamik + kaca t. 5mm (Kecil) -
Kaca polos 5 mm 0.529 M2 112,500.00 59,535.00
Engsel biasa 6.000 Bh 33,300.00 199,800.00
Handle pintu 2.000 Psg 166,100.00 332,200.00
Kunci pintu 1.000 Bh 141,200.00 141,200.00
Slot tanam 2.000 Bh 30,000.00 60,000.00
Alumunium 4" 6.760 M1 102,000.00 689,520.00
Sealant alumunium ke tembok 14.196 M1 3,000.00 42,588.00
Upah pasang 0.050 Lot 3,524,843.00 176,242.15
Jumlah 3,701,085.15
Keuntungan + Overhead 370,108.52
Jumlah 4,071,193.67
Dibulatkan 4,071,100.00

118 1 Unit Pintu tipe P2 Lengkap Terpasang (GD. KULIAH)


Bahan
Daun pintu rangka kayu kamper double teakwood 1.000 unit 1,250,000.00 1,250,000.00
samarinda fin. Melamik + kaca t. 5mm -
Kaca polos 5 mm 0.336 M2 112,500.00 37,800.00
Engsel biasa 3.000 Bh 33,300.00 99,900.00
Handle pintu 1.000 Psg 166,100.00 166,100.00
Kunci pintu 1.000 Bh 141,200.00 141,200.00
Alumunium 4" 6.800 M1 102,000.00 693,600.00
Sealant alumunium ke tembok 14.280 M1 3,000.00 42,840.00
Upah pasang 0.050 Lot 2,431,440.00 121,572.00
Jumlah 2,553,012.00
Keuntungan + Overhead 255,301.20
Jumlah 2,808,313.20
Dibulatkan 2,808,300.00

119 1 Unit Pintu tipe P3 Lengkap Terpasang (GD. KULIAH)


Bahan

161
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Daun pintu rangka kayu kamper depan panil, 1.000 unit 900,000.00 900,000.00
belakang lapis melaminto 3mm -
Engsel biasa 3.000 Bh 33,300.00 99,900.00
Handle pintu 1.000 Psg 166,100.00 166,100.00
Kunci pintu 1.000 Bh 141,200.00 141,200.00
Alumunium 4" 4.980 M1 102,000.00 507,960.00
Sealant alumunium ke tembok 10.458 M1 3,000.00 31,374.00
Upah pasang 0.050 Lot 1,846,534.00 92,326.70
Jumlah 1,938,860.70
Keuntungan + Overhead 193,886.07
Jumlah 2,132,746.77
Dibulatkan 2,132,700.00

120 1 Unit Pintu tipe P4 Lengkap Terpasang (GD. KULIAH)


Bahan
Daun pintu rangka kayu kamper double teakwood 1.000 unit 1,000,000.00 1,000,000.00
samarinda fin. Melamik -
Engsel biasa 3.000 Bh 166,100.00 498,300.00
Handle pintu 1.000 Psg 141,200.00 141,200.00
Kunci pintu 1.000 Bh 30,000.00 30,000.00
Alumunium 4" 5.760 M1 102,000.00 587,520.00
Sealant alumunium ke tembok 12.096 M1 3,000.00 36,288.00
Upah pasang 0.050 Lot 2,293,308.00 114,665.40
Jumlah 2,407,973.40
Keuntungan + Overhead 240,797.34
Jumlah 2,648,770.74
Dibulatkan 2,648,700.00

121 1 Unit Pintu tipe P5 Lengkap Terpasang (GD. KULIAH)


Bahan
Daun pintu rangka kayu kamper double teakwood 2.000 unit 800,000.00 1,600,000.00
samarinda fin. Melamik -
Engsel biasa 6.000 Bh 33,300.00 199,800.00
Handle pintu 2.000 Psg 166,100.00 332,200.00
Kunci pintu 1.000 Bh 141,200.00 141,200.00
Alumunium 4" 4.200 M1 102,000.00 428,400.00
Sealant alumunium ke tembok 8.820 M1 3,000.00 26,460.00
Upah pasang 0.050 Lot 2,728,060.00 136,403.00
Jumlah 2,864,463.00
Keuntungan + Overhead 286,446.30
Jumlah 3,150,909.30
Dibulatkan 3,150,900.00

122 1 Unit Pintu tipe P6 Lengkap Terpasang (GD. KULIAH)


Bahan
Daun pintu menggunakan bibir selebar 24mm diisi rockwool 2.000 unit 3,500,000.00 7,000,000.00
Engsel 6.000 Bh 87,500.00 525,000.00
tarikan pintu (panic bar) 2.000 Psg 225,400.00 450,800.00
Kunci pintu 1.000 Bh 141,200.00 141,200.00
door closer 2.000 bh 125,000.00 250,000.00
besi hollow 50 x 100 5.750 M1 189,000.00 1,086,750.00
Sealant alumunium ke tembok 12.075 M1 3,000.00 36,225.00
Upah pasang 0.050 Lot 9,489,975.00 474,498.75
Jumlah 9,964,473.75
Keuntungan + Overhead 996,447.38
Jumlah 10,960,921.13
Dibulatkan 10,960,900.00

162
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

123 1 Unit Pintu tipe P7 Lengkap Terpasang (GD. KULIAH)


Bahan
Daun pintu rangka kayu kamper double teakwood 11.000 Bh 650,000.00 7,150,000.00
samarinda fin. Melamik -
Rel atas 7.400 M1 200,000.00 1,480,000.00
Rel bawah 7.400 M1 150,000.00 1,110,000.00
Pivot 11.000 Psg 250,000.00 2,750,000.00
Hanger 11.000 Psg 50,000.00 550,000.00
Roda atas pinggir 11.000 bh 100,000.00 1,100,000.00
Roda bawah pinggir 11.000 bh 80,000.00 880,000.00
Engsel pintu 33.000 set 33,300.00 1,098,900.00
Braket 6.000 bh 75,000.00 450,000.00
Baut braket 6.000 bh 9,000.00 54,000.00
Handle pintu 2.000 Psg 166,100.00 332,200.00
Kunci pintu 1.000 Bh 141,200.00 141,200.00
Selot Tanam 11.000 Bh 49,900.00 548,900.00
Alumunium 4" 12.800 M1 102,000.00 1,305,600.00
Sealant alumunium 26.880 M1 3,000.00 80,640.00
Upah pasang 0.080 Lot 19,031,440.00 1,522,515.20
Jumlah 20,553,955.20
Keuntungan + Overhead 2,055,395.52
Jumlah 22,609,350.72
Dibulatkan 22,609,300.00

124 1 Unit Jendela tipe J1 Lengkap Terpasang (GD. KULIAH)


Bahan
Daun Jendela Rangka Alumunium lapis kaca 5 mm 4.000 unit 500,000.00 2,000,000.00
2
Kaca polos 5 mm 0.831 M 112,500.00 93,465.00
Engsel Casment 4.000 bh 72,800.00 291,200.00
Alumunium 4" 14.000 M1 102,000.00 1,428,000.00
Sealant alumunium 29.400 M1 3,000.00 88,200.00
Upah pasang 0.030 Lot 1,900,865.00 57,025.95
Jumlah 3,957,890.95
Keuntungan + Overhead 395,789.10
Jumlah 4,353,680.05
Dibulatkan 4,353,600.00

125 1 Unit Jendela tipe J2 Lengkap Terpasang (GD. KULIAH)


Bahan
Daun Jendela Rangka Alumunium lapis kaca 5 mm 4.000 unit 500,000.00 2,000,000.00
Kaca polos 5 mm 1.126 M2 112,500.00 126,630.00
Engsel Casment 4.000 bh 72,800.00 291,200.00
Alumunium 4" 14.800 M1 102,000.00 1,509,600.00
Sealant alumunium 31.080 M1 3,000.00 93,240.00
Upah pasang 0.030 Lot 2,020,670.00 60,620.10
Jumlah 4,081,290.10
Keuntungan + Overhead 408,129.01
Jumlah 4,489,419.11
Dibulatkan 4,489,400.00

126 1 Unit Jendela tipe J3 Lengkap Terpasang (GD. KULIAH)


Bahan
Daun Jendela Rangka Alumunium lapis kaca 5 mm (besar) 2.000 unit 750,000.00 1,500,000.00
Daun Jendela Rangka Alumunium lapis kaca 5 mm (kecil) 2.000 unit 500,000.00 1,000,000.00
Kaca polos 5 mm 2.150 M2 112,500.00 241,920.00
Engsel Casment 4.000 bh 72,800.00 291,200.00
Alumunium 4" 17.400 M1 102,000.00 1,774,800.00
Sealant alumunium 36.540 M1 3,000.00 109,620.00
Upah pasang 0.030 Lot 2,175,620.00 65,268.60

163
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Jumlah 4,982,808.60
Keuntungan + Overhead 498,280.86
Jumlah 5,481,089.46
Dibulatkan 5,481,000.00
127 1 Unit Jendela tipe J4 Lengkap Terpasang (GD. KULIAH)
Bahan
Kaca polos 5 mm 0.360 M2 112,500.00 40,500.00
Alumunium 4" 2.400 M1 102,000.00 244,800.00
Sealant alumunium 5.040 M1 3,000.00 15,120.00
Upah pasang 0.030 Lot 40,500.00 1,215.00
Jumlah 301,635.00
Keuntungan + Overhead 30,163.50
Jumlah 331,798.50
Dibulatkan 331,700.00

128 1 Unit Jendela tipe J5 Lengkap Terpasang (GD. KULIAH)


Bahan
Kaca polos 5 mm 5.400 M2 112,500.00 607,500.00
Alumunium 4" 17.500 M1 102,000.00 1,785,000.00
Sealant alumunium 36.750 M1 3,000.00 110,250.00
Upah pasang 0.030 Lot 607,500.00 18,225.00
Jumlah 2,520,975.00
Keuntungan + Overhead 252,097.50
Jumlah 2,773,072.50
Dibulatkan 2,773,000.00

129 1 Unit Pintu tipe PJ1 Lengkap Terpasang (GD. KULIAH)


Bahan
Kaca polos Tempered 12 mm 4.140 M2 859,700.00 3,559,158.00
Pintu frameless (tempered 12 mm) floor hinge dorma BTS 84 1.000 M2 4,200,000.00 4,200,000.00
Handle pintu 1.000 Psg 166,100.00 166,100.00
1
List Alumunium U 14.000 M 15,000.00 210,000.00
Sunblast Sticker 1.500 M2 60,000.00 90,000.00
Sealant alumunium ke tembok 28.000 M1 3,000.00 84,000.00
Karet Kaca 14.000 M1 40,000.00 560,000.00
Upah pasang 0.050 Lot 8,869,258.00 443,462.90
Jumlah 9,312,720.90
Keuntungan + Overhead 931,272.09
Jumlah 10,243,992.99
Dibulatkan 10,243,900.00

130 1 Unit Pintu Besi tipe P1 Lengkap Terpasang (RUMAH POMPA)


Bahan
Pelat Besi t = 2 mm 157.000 kg 9,833.33 1,543,833.33
Engsel biasa 3.000 Bh 37,500.00 112,500.00
Handle pintu 2.000 Psg 166,100.00 332,200.00
Besi Kanal C 150x100 mm 65.707 kg 9,833.33 646,120.80
Hollow 40x40 t = 0.8 mm 7.020 m' 30,000.00 210,600.00
Kawat Las 0.760 kg 43,833.33 33,313.33
Cat Besi 1.100 kg 48,150.00 52,965.00
Upah pasang 0.050 Lot 2,931,532.47 146,576.62
Jumlah 3,078,109.09
Keuntungan + Overhead 307,810.91
Jumlah 3,385,920.00
Dibulatkan 3,385,900.00
131 1 Unit Pintu Besi Wiremesh tipe P1 Lengkap Terpasang (RUANG GENSET)
Bahan

164
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Wiremesh 2 x 2 4.493 m2 54,100.00 243,060.48


Hollow 40x40 t = 0.8 mm 6.400 m' 30,000.00 192,000.00
Pelat Besi t = 5 mm 8.986 kg 17,000.00 152,755.20
Engsel biasa 2.000 Bh 37,500.00 75,000.00
Handle pintu 2.000 Psg 166,100.00 332,200.00
Besi Kanal C 150x100 mm 59.904 kg 21,000.00 1,257,984.00
Kawat Las 0.810 kg 43,833.33 35,505.00
Cat Besi 0.500 kg 48,150.00 24,075.00
Upah pasang 0.050 Lot 2,312,579.68 115,628.98
Jumlah 2,428,208.66
Keuntungan + Overhead 242,820.87
Jumlah 2,671,029.53
Dibulatkan 2,671,000.00
132 1 Unit Pintu Besi tipe P2 Lengkap Terpasang (RUANG GENSET)
Bahan
Pelat Besi t = 2 mm 141.074 kg 17,000.00 2,398,256.64
Hollow 40x40 t = 0.8 mm 6.400 m' 18,000.00 115,200.00
Engsel biasa 2.000 Bh 37,500.00 75,000.00
Handle pintu 2.000 Psg 166,100.00 332,200.00
Besi Kanal C 150x100 mm 59.904 kg 21,000.00 1,257,984.00
Kawat Las 0.760 kg 43,833.33 33,313.33
Cat Besi 1.100 kg 48,150.00 52,965.00
Upah pasang 0.050 Lot 4,264,918.97 213,245.95
Jumlah 4,478,164.92
Keuntungan + Overhead 447,816.49
Jumlah 4,925,981.41
Dibulatkan 4,925,900.00
133 1 Unit Jendela tipe BV1 Lengkap Terpasang (RUANG GENSET)
Bahan
Kaca polos 5 mm 0.270 M2 85,450.00 23,105.68
Alumunium 4" 2.400 M1 102,000.00 244,800.00
Sealant alumunium 5.280 M1 3,000.00 15,840.00
Upah pasang 0.030 Lot 283,745.68 8,512.37
Jumlah 292,258.05
Keuntungan + Overhead 29,225.81
Jumlah 321,483.86
Dibulatkan 321,400.00

134 1 Unit Jendela tipe BV2 Lengkap Terpasang (RUANG GENSET)


Bahan
Pelat Besi t = 2 mm 28.310 kg 17,000.00 481,270.00
Besi Kanal C 150x100 mm 29.952 kg 21,000.00 628,992.00
Kawat Las 0.270 kg 43,833.33 11,835.00
Cat Besi 0.280 kg 48,150.00 13,482.00
Upah pasang 0.050 Lot 1,135,579.00 56,778.95
Jumlah 1,192,357.95
Keuntungan + Overhead 119,235.80
Jumlah 1,311,593.75
Dibulatkan 1,311,500.00
135 1 Unit Jendela tipe BV3 Lengkap Terpasang (RUANG GENSET)
Bahan
Pelat Besi t = 2 mm 18.873 kg 17,000.00 320,841.00
Besi Kanal C 150x100 mm 26.208 kg 21,000.00 550,368.00
Kawat Las 0.260 kg 43,833.33 11,396.67
Cat Besi 0.270 kg 48,150.00 13,000.50
Upah pasang 0.050 Lot 895,606.17 44,780.31
Jumlah 940,386.48

165
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Keuntungan + Overhead 94,038.65


Jumlah 1,034,425.12
Dibulatkan 1,034,400.00
136 1 Unit Pintu Besi tipe P1 Lengkap Terpasang (GARDU PLN)
Bahan
Pelat Besi t = 2 mm 82.896 kg 17,000.00 1,409,232.00
Engsel biasa 1.000 Bh 37,500.00 37,500.00
Handle pintu 1.000 Psg 166,100.00 166,100.00
Besi Kanal C 150x100 mm 48.672 kg 21,000.00 1,022,112.00
Kawat Las 0.420 kg 10,500.00 4,410.00
Cat Besi 0.820 kg 48,150.00 39,483.00
Upah pasang 0.050 Lot 2,678,837.00 133,941.85
Jumlah 2,812,778.85
Keuntungan + Overhead 281,277.89
Jumlah 3,094,056.74
Dibulatkan 3,094,000.00
137 1 Unit Jendela Besi tipe BV1 Lengkap Terpasang (GARDU PLN)
Bahan
Pelat Besi t = 2 mm 74.203 kg 17,000.00 1,261,451.00
Besi Kanal C 150x100 mm 84.240 kg 21,000.00 1,769,040.00
Engsel biasa 1.000 Bh 37,500.00 37,500.00
Handle pintu 1.000 Psg 166,100.00 166,100.00
Kawat Las 0.420 kg 10,500.00 4,410.00
Cat Besi 0.740 kg 48,150.00 35,631.00
Upah pasang 0.050 Lot 3,274,132.00 163,706.60
Jumlah 3,437,838.60
Keuntungan + Overhead 343,783.86
Jumlah 3,781,622.46
Dibulatkan 3,781,600.00

138 1 M2 Memasang Dinding Mamer


Bahan
Marmer 1.000 m2 375,000.00 375,000.00
Semen portland 9.300 Kg 1,333.33 12,400.00
Pasir pasang 0.018 M3 188,523.81 3,393.43
Semen warna 1.940 Kg 15,683.33 30,425.67
Jumlah Bahan 421,219.10
Tenaga kerja
Pekerja 0.500 Oh 51,000.00 25,500.00
Tukang batu 0.250 Oh 63,800.00 15,950.00
Kepala tukang 0.025 Oh 76,600.00 1,915.00
Mandor 0.015 Oh 89,300.00 1,339.50
Jumlah Upah 44,704.50
Jumlah Bahan + Upah 465,923.60
Keuntungan + Overhead 46,592.36
Jumlah 512,515.95
Dibulatkan 512,500.00

139 1 M2 Memasang Dinding Keramik ukuran 20 x 40 cm


Bahan
Keramik 20 x 40 Polished 13.000 Bh 8,203.85 106,650.00
Semen portland 9.300 Kg 1,333.33 12,400.00
Pasir pasang 0.018 M3 188,523.81 3,393.43
Semen warna 1.940 Kg 15,683.33 30,425.67
Jumlah Bahan 152,869.10
Tenaga kerja
Pekerja 0.500 Oh 51,000.00 25,500.00

166
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Tukang batu 0.250 Oh 63,800.00 15,950.00


Kepala tukang 0.025 Oh 76,600.00 1,915.00
Mandor 0.015 Oh 89,300.00 1,339.50
Jumlah Upah 44,704.50
Jumlah Bahan + Upah 197,573.60
Keuntungan + Overhead 19,757.36
Jumlah 217,330.95
Dibulatkan 217,300.00

140 1 M2 Memasang Dinding Keramik ukuran 30 x 30 cm


Bahan
Keramik 20 x 25 Polished 12.000 Bh 4,348.21 52,178.52
Semen portland 9.300 Kg 1,333.33 12,400.00
Pasir pasang 0.018 M3 188,523.81 3,393.43
Semen warna 1.940 Kg 15,683.33 30,425.67
Jumlah Bahan 98,397.61
Tenaga kerja
Pekerja 0.500 Oh 51,000.00 25,500.00
Tukang batu 0.250 Oh 63,800.00 15,950.00
Kepala tukang 0.025 Oh 76,600.00 1,915.00
Mandor 0.015 Oh 89,300.00 1,339.50
Jumlah Upah 44,704.50
Jumlah Bahan + Upah 143,102.11
Keuntungan + Overhead 14,310.21
Jumlah 157,412.33
Dibulatkan 157,400.00

141 1 M2 Memasang lantai Homogenous Tile 60 x 60 cm Polished


Bahan
Homogenous Tile 2.778 Bh 80,280.00 223,000.00
Semen portland 8.190 Kg 1,333.33 10,920.00
Pasir pasang 0.045 M3 188,523.81 8,483.57
Semen warna 1.620 Kg 15,683.33 25,407.00
Jumlah Bahan 267,810.57
Tenaga kerja
Pekerja 0.500 Oh 51,000.00 25,500.00
Tukang batu 0.250 Oh 63,800.00 15,950.00
Kepala tukang 0.025 Oh 76,600.00 1,915.00
Mandor 0.015 Oh 89,300.00 1,339.50
Jumlah Upah 44,704.50
Jumlah Bahan + Upah 312,515.07
Keuntungan + Overhead 31,251.51
Jumlah 343,766.58
Dibulatkan 343,700.00

142 1 M2 Memasang lantai Homogenous Tile ukuran 60 x 60 cm Unpolish


Bahan
Homogenous Tile 2.778 Bh 86,400.00 240,000.00
Semen portland 8.190 Kg 1,333.33 10,920.00
Pasir pasang 0.045 M3 188,523.81 8,483.57
Semen warna 1.620 Kg 15,683.33 25,407.00
Jumlah Bahan 284,810.57
Tenaga kerja
Pekerja 0.500 Oh 51,000.00 25,500.00
Tukang batu 0.250 Oh 63,800.00 15,950.00
Kepala tukang 0.025 Oh 76,600.00 1,915.00
Mandor 0.015 Oh 89,300.00 1,339.50
Jumlah Upah 44,704.50

167
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Jumlah Bahan + Upah 329,515.07


Keuntungan + Overhead 32,951.51
Jumlah 362,466.58
Dibulatkan 362,400.00

143 1 M2 Memasang Homogenous Tile ukuran 30 x 30 cm polished


Bahan
Ubin keramik 12.000 Bh 21,250.00 255,000.00
Semen portland 8.190 Kg 1,333.33 10,920.00
3
Pasir pasang 0.045 M 188,523.81 8,483.57
Semen warna 1.620 Kg 15,683.33 25,407.00
Jumlah Bahan 299,810.57
Tenaga kerja
Pekerja 0.500 Oh 51,000.00 25,500.00
Tukang batu 0.250 Oh 63,800.00 15,950.00
Kepala tukang 0.025 Oh 76,600.00 1,915.00
Mandor 0.015 Oh 89,300.00 1,339.50
Jumlah Upah 44,704.50
Jumlah Bahan + Upah 344,515.07
Keuntungan + Overhead 34,451.51
Jumlah 378,966.58
Dibulatkan 378,900.00

144 1 M2 Memasang lantai Keramik ukuran 30 x 30 cm Unpolish


Bahan
Ubin keramik 12.000 Bh 4,348.21 52,178.52
Semen portland 8.190 Kg 1,333.33 10,920.00
Pasir pasang 0.045 M3 188,523.81 8,483.57
Semen warna 1.620 Kg 15,683.33 25,407.00
Jumlah Bahan 96,989.09
Tenaga kerja
Pekerja 0.500 Oh 51,000.00 25,500.00
Tukang batu 0.250 Oh 63,800.00 15,950.00
Kepala tukang 0.025 Oh 76,600.00 1,915.00
Mandor 0.015 Oh 89,300.00 1,339.50
Jumlah Upah 44,704.50
Jumlah Bahan + Upah 141,693.59
Keuntungan + Overhead 14,169.36
Jumlah 155,862.95
Dibulatkan 155,800.00

145 1 M2 Memasang lantai Keramik ukuran 20 x 20 cm Unpolish


Bahan
Ubin keramik 25.000 Bh 2,486.67 62,166.67
Semen portland 8.190 Kg 1,333.33 10,920.00
Pasir pasang 0.045 M3 188,523.81 8,483.57
Semen warna 1.620 Kg 15,683.33 25,407.00
Jumlah Bahan 106,977.24
Tenaga kerja
Pekerja 0.500 Oh 51,000.00 25,500.00
Tukang batu 0.250 Oh 63,800.00 15,950.00
Kepala tukang 0.025 Oh 76,600.00 1,915.00
Mandor 0.015 Oh 89,300.00 1,339.50
Jumlah Upah 44,704.50
Jumlah Bahan + Upah 151,681.74
Keuntungan + Overhead 15,168.17
Jumlah 166,849.91

168
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Dibulatkan 166,800.00

146 1 M1 Memasang plint Homogenous Tile ukuran 10 x 60 cm


Bahan
Plint 10 x 60 cm 1.667 Bh 14,400.00 24,000.00
Semen portland 0.800 Kg 1,333.33 1,066.67
Pasir pasang 0.003 M3 188,523.81 565.57
Semen warna 0.013 Kg 15,683.33 203.88
Jumlah Bahan 25,836.12
Tenaga kerja
Pekerja 0.090 Oh 51,000.00 4,590.00
Tukang batu 0.090 Oh 63,800.00 5,742.00
Kepala tukang 0.009 Oh 76,600.00 689.40
Mandor 0.005 Oh 89,300.00 446.50
Jumlah Upah 11,467.90
Jumlah Bahan + Upah 37,304.02
Keuntungan + Overhead 3,730.40
Jumlah 41,034.42
Dibulatkan 41,000.00

147 1 M1 Memasang plint Homogenous Tile ukuran 10 x 30 cm


Bahan
Plint 10 x 30 cm 3.500 Bh 7,083.33 24,791.67
Semen portland 0.800 Kg 1,333.33 1,066.67
Pasir pasang 0.003 M3 188,523.81 565.57
Semen warna 0.013 Kg 15,683.33 203.88
Jumlah Bahan 26,627.79
Tenaga kerja
Pekerja 0.090 Oh 51,000.00 4,590.00
Tukang batu 0.090 Oh 63,800.00 5,742.00
Kepala tukang 0.009 Oh 76,600.00 689.40
Mandor 0.005 Oh 89,300.00 446.50
Jumlah Upah 11,467.90
Jumlah Bahan + Upah 38,095.69
Keuntungan + Overhead 3,809.57
Jumlah 41,905.26
Dibulatkan 41,900.00

148 1 M1 Memasang step nozing ukuran 10 x 30 cm


Bahan
step nozing 10 x 30 3.500 Bh 10,000.00 35,000.00
Semen portland 1.650 Kg 1,333.33 2,200.00
Pasir pasang 0.032 M3 188,523.81 6,032.76
Semen warna 0.100 Kg 15,683.33 1,568.33
Jumlah Bahan 44,801.10
Tenaga kerja
Pekerja 0.150 Oh 51,000.00 7,650.00
Tukang batu 0.050 Oh 63,800.00 3,190.00
Kepala tukang 0.025 Oh 76,600.00 1,915.00
Mandor 0.025 Oh 89,300.00 2,232.50
Jumlah Upah 14,987.50
Jumlah Bahan + Upah 59,788.60
Keuntungan + Overhead 5,978.86
Jumlah 65,767.45
Dibulatkan 65,700.00

149 1 M2 Memasang Batu Candi

169
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Bahan
Batu Candi 1.050 m2 187,000.00 196,350.00
Semen portland 10.750 Kg 1,333.33 14,333.33
Pasir pasang 0.035 M3 188,523.81 6,598.33
Jumlah Bahan 217,281.67
Tenaga kerja
Pekerja 0.420 Oh 51,000.00 21,420.00
Tukang batu 0.300 Oh 63,800.00 19,140.00
Kepala tukang 0.035 Oh 76,600.00 2,681.00
Mandor 0.030 Oh 89,300.00 2,679.00
Peralatan 0.100 lot 217,281.67 21,728.17
Jumlah Upah 67,648.17
Jumlah Bahan + Upah 284,929.83
Keuntungan + Overhead 28,492.98
Jumlah 313,422.82
Dibulatkan 313,400.00

150 1 M2 Pengecatan dinding (3x)


Bahan
Cat tembok interior 0.175 Kg 68,400.00 11,970.00
Plamur tembok 0.160 Kg 19,625.00 3,140.00
Rol cat 0.010 Bh 27,500.00 275.00
Ampelas 0.500 Lbr 4,606.67 2,303.33
Jumlah Bahan 17,688.33
Tenaga kerja
Pekerja 0.104 Oh 51,000.00 5,304.00
Tukang cat 0.182 Oh 63,800.00 11,611.60
Kepala tukang 0.020 Oh 76,600.00 1,493.70
Mandor 0.010 Oh 89,300.00 893.00
Jumlah Upah 19,302.30
Jumlah Bahan + Upah 36,990.63
Keuntungan + Overhead 3,699.06
Jumlah 40,689.70
Dibulatkan 40,600.00

151 1 M2 Pengecatan dinding setara Dulux (Weathershield) (3x)


Bahan
Cat tembok eksterior 0.175 Kg 76,166.67 13,329.17
Cat dasar alkali 0.160 Kg 8,897.33 1,423.57
Rol cat 0.010 Bh 27,500.00 275.00
Ampelas 0.500 Lbr 4,606.67 2,303.33
Jumlah Bahan 17,331.07
Tenaga kerja
Pekerja 0.104 Oh 51,000.00 5,304.00
Tukang cat 0.182 Oh 63,800.00 11,611.60
Kepala tukang 0.020 Oh 76,600.00 1,493.70
Mandor 0.010 Oh 89,300.00 893.00
Jumlah Upah 19,302.30
Jumlah Bahan + Upah 36,633.37
Keuntungan + Overhead 3,663.34
Jumlah 40,296.71
Dibulatkan 40,200.00

152 1 M2 Waterproofing membrane sheet + Screeding 3 cm


Bahan
membrane sheet 1.050 m2 100,000.00 105,000.00
PC 14.140 Kg 1,333.33 18,853.33
pasir pasang 0.042 m3 188,523.81 7,918.00

170
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Jumlah Bahan 131,771.33


Tenaga kerja
Pekerja 0.260 Oh 51,000.00 13,260.00
Tukang cat 0.200 Oh 63,800.00 12,760.00
Kepala tukang 0.020 Oh 76,600.00 1,532.00
Mandor 0.013 Oh 89,300.00 1,160.90
Jumlah Upah 28,712.90
Jumlah Bahan + Upah 160,484.23
Keuntungan + Overhead 8,024.21
Jumlah 168,508.45
Dibulatkan 168,500.00

153 1 M2 Waterproofing Coating + Screeding 3 cm


Bahan
Screeding 3 cm 1.000 m2 50,000.00 50,000.00
Waterproofing Emulsion 1.000 Kg 55,000.00 55,000.00
Kuas 3 " 0.250 Bh 12,460.00 3,115.00
Jumlah Bahan 108,115.00
Tenaga kerja
Pekerja 0.104 Oh 51,000.00 5,304.00
Tukang cat 0.182 Oh 63,800.00 11,611.60
Kepala tukang 0.020 Oh 76,600.00 1,493.70
Mandor 0.010 Oh 89,300.00 893.00
Jumlah Upah 19,302.30
Jumlah Bahan + Upah 127,417.30
Keuntungan + Overhead 6,370.87
Jumlah 133,788.17
Dibulatkan 133,700.00

154 1 M2 Pengecatan plafond Vinilex (3x)


Bahan
Cat tembok vinilex 0.200 Kg 68,400.00 13,680.00
Plamur tembok 0.160 Kg 19,625.00 3,140.00
Rol cat 0.010 Bh 27,500.00 275.00
Ampelas 0.500 Lbr 4,606.67 2,303.33
Jumlah Bahan 19,398.33
Tenaga kerja
Pekerja 0.104 Oh 51,000.00 5,304.00
Tukang cat 0.152 Oh 63,800.00 9,697.60
Kepala tukang 0.020 Oh 76,600.00 1,493.70
Mandor 0.010 Oh 89,300.00 893.00
Jumlah Upah 17,388.30
Jumlah Bahan + Upah 36,786.63
Keuntungan + Overhead 3,678.66
Jumlah 40,465.30
Dibulatkan 40,400.00

155 1 M2 Coating batu alam


Bahan
Coating batu alam 2 x 0.280 ltr 70,000.00 19,600.00
Kwas 3" 0.050 Bh 12,460.00 623.00
Jumlah Bahan 20,223.00
Tenaga kerja
Pekerja 0.1040 Oh 51,000.00 5,304.00
Tukang cat 0.1820 Oh 63,800.00 11,611.60
Kepala tukang 0.0042 Oh 76,600.00 321.72
Mandor 0.0025 Oh 89,300.00 223.25
Jumlah Upah 17,460.57
Jumlah Bahan + Upah 37,683.57

171
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Keuntungan + Overhead 3,768.36


Jumlah 41,451.93
Dibulatkan 41,400.00

156 1 M2 Cat besi


Bahan
cat besi 0.280 ltr 21,720.00 6,081.60
Kwas 3" 0.050 Bh 12,460.00 623.00
Ampelas 0.500 Lbr 4,606.67 2,303.33
Jumlah Bahan 9,007.93
Tenaga kerja
Pekerja 0.1040 Oh 51,000.00 5,304.00
Tukang cat 0.1820 Oh 63,800.00 11,611.60
Kepala tukang 0.0042 Oh 76,600.00 321.72
Mandor 0.0025 Oh 89,300.00 223.25
Jumlah Upah 17,460.57
Jumlah Bahan + Upah 26,468.50
Keuntungan + Overhead 2,646.85
Jumlah 29,115.35
Dibulatkan 29,100.00

157 1 M2 Pekerjaan Pemasangan Paving Block Natural T=8 cm


Bahan
Paving Blok Natural 8 cm 1.0100 m2 81,335.00 82,148.35
Pasir Beton 0.0500 m3 224,523.81 11,226.19
Jumlah Bahan 93,374.54
Tenaga kerja
Pekerja 0.2000 Oh 51,000.00 10,200.00
Tukang batu 0.4000 Oh 63,800.00 25,520.00
Kepala tukang batu 0.0200 Oh 76,600.00 1,532.00
Mandor 0.0024 Oh 89,300.00 214.32
Alat Bantu 0.0800 Lot 37,466.32 2,997.31
Jumlah Upah 40,463.63
Jumlah Bahan + Upah 133,838.17
Keuntungan + Overhead 13,383.82
Jumlah 147,221.98
Dibulatkan 147,200.00

158 1 M1 Pekerjaan Pemasangan Kansteen uk. 600x150x300


Bahan
Kansteen 1.6600 Bh 75,000.00 124,500.00
Semen Portland 0.0005 Kg 1,333.33 0.67
Pasir Pasang 0.0012 M3 188,523.81 226.23
Alat Bantu 0.1000 Ls 124,726.90 12,472.69
Jumlah Bahan 137,199.58
Tenaga kerja
Pekerja 0.0875 Oh 51,000.00 4,462.50
Tukang batu 0.0438 Oh 63,800.00 2,791.25
Mandor 0.0219 Oh 89,300.00 1,953.44
Jumlah Upah 9,207.19
Jumlah Bahan + Upah 146,406.77
Keuntungan + Overhead 14,640.68
Jumlah 161,047.45
Dibulatkan 161,000.00

159 1 M1 Saluran Pasangan Batu Kali 1 Pc : 5 Psr + Grevel 30


Bahan
Galian Tanah 1.260 M3 54,900.00 69,174.00
Grevel dia 30 1.000 Bh 65,000.00 65,000.00
Pas. Batu Kali 1 Pc : 5 Ps 0.900 M' 719,500.00 647,550.00

172
HARGA SATUAN JUMLAH HARGA
NO URAIAN PEKERJAAN INDEKS SATUAN (Rp) (Rp)

Siar 0.720 M2 25,000.00 18,000.00


Jumlah Bahan 799,724.00
Keuntungan + Overhead 79,972.40
Jumlah 879,696.40
Dibulatkan 879,600.00

160 1 M3 Pekerjaan Lapis Pondasi Bawah / LPB Telflord (15 cm)


Bahan
Batu Pecah 15 - 20 cm 0.6000 M3 168,333.33 101,000.00
Batu Pecah 5 - 7 cm 0.2400 M3 242,500.00 58,200.00
Pasir Urug 0.3600 M3 160,761.90 57,874.29
Alat Bantu 0.1000 Ls 217,074.29 21,707.43
Jumlah Bahan 238,781.71
Tenaga kerja
Pekerja 0.4024 Oh 51,000.00 20,521.13
Mandor 0.0335 Oh 89,300.00 2,988.20
Jumlah Upah 23,509.33
PERALATAN
Mesin Gilas Tiga Roda ( Roda 3 Wheel ) 0.0268 Jam 259,000.00 6,941.20
Dump Truck 3.5 - 4 T 0.0214 Jam 346,000.00 7,404.40
Jumlah peralatan 14,345.60
Jumlah Bahan + Upah + peralatan 276,636.64
Keuntungan + Overhead 27,663.66
Jumlah 304,300.30
Dibulatkan 304,300.00

161 1 M3 Pekerjaan Lapis Pondasi Agregat Kelas A ( Lapis Pondasi Atas ), 10 cm


Bahan
Material LPA Kelas A 1.2000 M3 154,800.00 185,760.00
Alat Bantu 0.1000 M3 185,760.00 18,576.00
Jumlah Bahan 204,336.00
Tenaga kerja
Pekerja 0.6694 Oh 51,000.00 34,136.85
Mandor 0.0335 Oh 89,300.00 2,988.20
Jumlah Upah 37,125.05
PERALATAN
Dump Truck 3.5 - 4 T 0.0297 Jam 346,000.00 10,276.20
Tandem Roller 0.0636 Jam 251,000.00 15,963.60
Truck Tangki Air 0.0211 Jam 273,000.00 5,760.30
Jumlah peralatan 32,000.10
Jumlah Bahan + Upah + peralatan 273,461.15
Keuntungan + Overhead 27,346.12
Jumlah 300,807.27
Dibulatkan 300,800.00

173
DAFTAR HARGA
SATUAN BAHAN

Pekerjaan : Pembangunan Politeknik KP Pangandaran


Lokasi : Pangandaran - Jawa Barat
Thn Anggaran : 2018

NO JENIS BAHAN SATUANHARGA SATUAN (Rp)

1 2 3 4

A. JENIS AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADI


1 Pasir Urug m3 160,761.90
2 Sirtu m3 163,166.67
3 Cabluk m3 104,400.00
4 Pasir Pasang m3 188,523.81
5 Pasir Beton m3 224,523.81
6 Kerikil m3 175,000.00
7 Batu Pecah Mesin 1:2 m3 283,333.33
8 Batu Belah Pondasi m3 187,777.78
9 Batu Pecah 15 - 20 cm m3 168,333.33
10 Batu Pecah 5 - 7 cm m3 242,500.00
11 Material LPA Klas A m3 154,800.00
12 Batu Candi uk. 20 x 40 dan 20 x 20 cm m2 187,000.00
13 Bata Merah Bakar Kelas I Bh 800.00
14 Bata Ringan m3 725,000.00
15 Paving Block 8 cm Natural ex. Cisangkan m2 81,335.00
16 Floor hardener natural kg 7,500.00
17 Floor hardener warna kg 14,000.00
18 Semen PC 50 Kg zak 66,666.67
19 Semen Gypsum kg 6,312.50
20 Semen Warna Kg 15,683.33
B. BAHAN FINISHING : LABURAN, PENGISI DAN ALATNYA -
1 Plamir Tembok Kg 19,625.00
2 Cat Tembok ICI Eksterior, kg 76,166.67
3 Cat Tembok Interior kg 68,400.00
4 Cat Dasar Tembok kg 44,486.67
5 Waterproofing Emulsion Kg 55,000.00
6 Rol cat bh 27,500.00
7 Kwas 3" bh 12,460.00
8 Hampelas Lbr 4,606.67
9 Meni Kayu / Besi Kg 21,720.00
10 Precoat Liter 70,000.00
11 Lem Kuning (Albond) Kg 37,250.00
12 Pelumas Liter 38,000.00
C. BAHAN KAYU BERIKUT BAHAN JADINYA -
1 Kayu Balok Borneo Super m3 5,245,000.00
NO JENIS BAHAN SATUANHARGA SATUAN (Rp)

1 2 3 4

2 Kayu Terentang m3 2,448,000.00


3 Dolken 7 - 10 btg 26,750.00
4 Dolken dia. 8 s/d 10 cm btg 57,500.00
5 Kayu Balok Albasia m3 1,550,000.00
6 Kayu Papan Albasia m3 1,700,000.00
7 Kayu balok lokal KLS II m3 1,902,333.33
8 Kayu papan lokal KLS II m3 2,122,666.67
9 Kayu balok borneo m3 4,941,250.00
10 Kayu papan borneo, uk. 3/20 cm m3 5,842,500.00
11 Kayu balok borneo super (meranti) m3 7,502,000.00
12 Kayu papan borneo super (meranti) uk. 3/20 cm m3 4,530,600.00
13 Kayu balok borneo super (meranti) uk. 3/30 cm m3 4,530,600.00
14 Kayu balok kamper medan (kruing) m3 7,506,500.00
15 Kayu balok kamper banjar m3 7,738,000.00
16 Kayu balok kamper banjar, uk. 3/20 cm m3 7,250,000.00
17 Kayu balok kamper banjar, uk. 3/30 cm m3 7,680,000.00
18 Kayu balok kamper samarinda m3 10,648,000.00
19 Kayu papan kamper samarinda, 3/20 cm m3 10,779,700.00
20 Kayu balok jati m3 13,955,000.00
21 kayu papan jati m3 15,171,666.67
22 Kayu kaso borneo super (meranti), uk. 5/7 - 4 m m3 5,064,500.00
23 Kayu kaso btg 20,000.00
24 Bambu dia. 5 - 7 cm btg 17,550.00
25 Bambu dia. 7 - 10 cm btg 34,000.00
26 Bambu gombong btg 66,000.00
27 Bilik hinis m2 22,125.00
28 Bilik, tanpa hinis m2 25,000.00
D. BAHAN PENUTUP RANGKA PLAFOND -
1 Hardfleks 4 mm 120 x 240 cm (GRC) Lbr 59,500.00
2 Gypsum 120 x 240 cm ex. Luar Lbr 69,250.00
3 List Gypsum C-7 m' 17,000.00
E. BAHAN KAYU LAPIS -
1 Multipleks 9 mm 120 x 240 Lbr 130,266.67
2 MDF tebal 9 mm Lbr 185,000.00
3 HPL ( High Pressure Laminate) m2 78,500.00
4 Play Wood 4 mm 120 x 240 Lbr 86,000.00
F. BAHAN LANTAI DAN PELAPIS DINDING -
1 Homogenous Tile 60 x 60 KW I DN Corak / Warna m2 223,000.00
2 Homogenous Tile 40 x 40 KW I DN Corak / Warna Unpolish m2 240,000.00
3 Homogenous Tile 30 x 30 KW I DN Corak / Warna m2 255,000.00
4 Keramik 20 x 40 KW I DN Corak / Warna Unpolish m2 106,650.00
5 Keramik 30 x 30 KW I DN Corak / Warna Unpolish m2 52,178.52
6 Keramik 20 x 20 KW I DN Corak / Warna Unpolish m2 62,166.67
NO JENIS BAHAN SATUANHARGA SATUAN (Rp)

1 2 3 4

7 Keramik Dinding 20 x 25 Corak / Warna m2 52,500.00


8 step nozing 10 x 30 bh 10,000.00
G. BAHAN SALURAN AIR KOTOR / BERSIH -
1 Pipa PVC dia. 12.5 mm S.10 / ½ inch m1 5,656.67
2 Pipa PVC dia. 20 mm S.10 / ¾ inch m1 8,266.67
3 Pipa PVC dia. 40 mm S.10 / 1½ inch m1 18,241.67
4 Pipa PVC dia. 50 mm S.10 / 2 inch m1 28,361.67
5 Pipa PVC dia. 110 mm S.12.5 / 4 inch m1 42,110.00
6 Pipa PVC dia. 160 mm S.15 / 6 inch m1 62,500.00
H. BAHAN LOGAM DAN BAHAN JADINYA -
1 Baja Tulangan U 24 Polos kg 9,833.33
2 Baja Tulangan U 42 Ulir kg 11,000.00
3 Besi Profil L dan Besi C kg 21,000.00
4 Kuda-kuda Rangka Baja Ringan (Zincalume) m2 326,700.00
5 Besi Hollow 4x4 t = 0.8 mm m1 22,160.00
6 Besi Hollow 4x4 t = 1,2 mm m1 30,000.00
7 Besi Hollow 5x10 t = 1.2 mm m1 45,000.00
8 Metal Furring untuk partisi T = 0,4 mm m1 13,770.00
9 Kawat Beton kg 17,820.00
10 Kawat Las kg 43,833.33
11 Seng Plat BJLS 30 Lebar 90 cm (1 Roll 50 m) m1 73,825.00
12 Plat Besi Tipis 5 mm s/d 10 mm kg 17,000.00
13 Kusen Alumunium 4" m1 102,000.00
14 Karet Kaca m1 40,000.00
15 Sealant tube 36,000.00
16 Sealent Alumunium ke Kaca m1 4,000.00
17 Sealent Alumunium ke Tembok m1 3,000.00
I. BAHAN KACA -
1 Kaca Polos 5 mm m2 85,450.00
2 Kaca Polos 8 mm m2 164,000.00
3 Kaca tempered 5 mm m2 200,000.00
4 Kaca tempered 12 mm m2 700,000.00
5 Sunblast Sticker m2 60,000.00
J. BAHAN PAKU DAN MUR BAUT -
1 Paku 4 s/d 7 cm kg 13,500.00
2 Paku 8 s/d 12 cm kg 13,250.00
3 Paku Skrup kg 18,865.00
K. BAHAN SANITARI -
1 Kran Tembok Ex. Toto type. TX609 bh 150,000.00
2 Kran Ex. Toto type. TX609 bh 250,000.00
3 Shower Ex. TOTO TX 492 SG bh 863,000.00
4 Wastafel ex. Toto LW 640 + kran TX 115 LESN unit 1,600,000.00
NO JENIS BAHAN SATUANHARGA SATUAN (Rp)

1 2 3 4

5 Kloset duduk ex. Toto type CW 660 NJ / SW 660 J unit 1,200,000.00


6 Closet Jongkok Ex. TOTO C7 unit 263,000.00
7 Kitchen Zink Stainless Standar Lokal (1 Lubang) unit 278,250.00
8 Tempat sabun ex. Toto S161 bh 80,000.00
9 Bak mandi fiber unit 338,750.00
10 Seal Tape bh 6,000.00
11 Floor Drain ex. Toto type TX1BN bh 385,000.00
12 Jet Washer ex. Toto type THX 20 NBPIV bh 260,000.00
13 Tempat tisue ex. Toto AW360 J bh 456,000.00
14 Gantungan baju ex. Toto type TX704ACW bh 300,800.00
15 T-Joint bh 70,000.00
16 Plug & Chain Waste with P-Trap bh 80,000.00
17 Single Lever Lavatory Faucet bh 250,000.00
18 Roof drain bh 187,500.00
L. BAHAN PENUTUP ATAP
1 Atap Metalroof Tekstur t = 0.25 mm lbr 90,000.00
2 Nok Atas Metalroof t = 0.25 mm lbr 54,000.00
3 Seng Gelombang Kecil 105 x 180 cm lbr 67,500.00
M. BAHAN ALAT PENGGANTUNG / KUNCI
1 Tarikan Pintu Biasa psg 112,500.00
2 Kunci Silinder 2 Slaag Untuk Pintu Kayu bh 108,500.00
3 Kunci KM Bulat bh 120,000.00
4 Kunci Swing Jendela bh 25,000.00
5 Kunci 2 Slaag bh 118,750.00
6 Nako Lengkap Tralis 1 Daun bh 25,000.00
7 Sloot Pintu tanam psg 30,000.00
8 Sloot Jendela Tunggal bh 10,000.00
9 Hak Angin bh 8,750.00
10 Engsel Jendela Casment psg 61,300.00
11 Engsel Pintu (floor Hinge) psg 1,420,000.00
12 Engsel Pintu psg 37,500.00
13 Engsel Jendela psg 13,000.00
N BAHAN LAIN-LAIN
1 Beton Ready Mix K-175 m3 967,500.00
2 Beton Ready Mix K-250 m3 1,075,000.00
3 Beton Ready Mix K-275 m3 1,120,000.00
4 Beton Ready Mix K-300 m3 1,180,000.00
5 Sewa Alat Pompa Beton m3 86,000.00
O JENIS SEWA PERALATAN PER JAM KERJA
1 Motor Grader >100 HP jam 369,000.00
2 Roller 3 Wheel 8-10 T jam 259,000.00
3 Tandem Roller 6-8 T jam 251,000.00
4 Peunematic Type Roller jam 93,984.00
5 Vibrator Roler 5-8 T jam 241,000.00
NO JENIS BAHAN SATUANHARGA SATUAN (Rp)

1 2 3 4

6 Tamper 0,20 T jam 38,000.00


7 Concret Vibrator jam 49,000.00
8 Asphalt Sprayer 800 L jam 76,000.00
9 Asphalt Finisher 5 T jam 211,000.00
10 Water Tank Truck 3000-4500 L jam 273,000.00
11 Dump Truck 8 Ton jam 346,000.00
12 Concrete Mixer 0.30 - 0.600 M3 jam 70,000.00
13 Compressor 4000-6500 L/M jam 225,000.00
14 Water Pump 70-100 mm jam 39,000.00
15 Excavator 80 -140 Hp jam 413,000.00
DAFTAR HARGA
SATUAN UPAH

Pekerjaan : Pembangunan Politeknik KP Pangandaran


Lokasi : Pangandaran - Jawa Barat
Thn Anggaran : 2018

No. Jenis Tenaga Kerja Harga Satuan Satuan


( Rp )

1 Pekerja 51,000.00 Orang / Hari / 8 Jam


2 Tukang Gali 63,800.00 Orang / Hari / 8 Jam
3 Tukang Batu 63,800.00 Orang / Hari / 8 Jam
4 Kepala Tukang Batu 76,600.00 Orang / Hari / 8 Jam
5 Tukang Kayu 63,800.00 Orang / Hari / 8 Jam
6 Kepala Tukang Kayu 76,600.00 Orang / Hari / 8 Jam
7 Tukang Besi Profil / Tukang Las 63,800.00 Orang / Hari / 8 Jam
8 Kepala Tukang Besi Profil / Tukang Las 76,600.00 Orang / Hari / 8 Jam
9 Tukang Besi Beton 63,800.00 Orang / Hari / 8 Jam
10 Kepala Tukang Besi Beton 76,600.00 Orang / Hari / 8 Jam
11 Tukang Cat 63,800.00 Orang / Hari / 8 Jam
12 Kepala Tukang Cat 76,600.00 Orang / Hari / 8 Jam
13 Mandor 89,300.00 Orang / Hari / 8 Jam
14 Mekanik 89,300.00 Orang / Hari / 8 Jam
15 Operator 89,300.00 Orang / Hari / 8 Jam
16 Pembantu Operator 51,000.00 Orang / Hari / 8 Jam
17 Supir Truk 76,600.00 Orang / Hari / 8 Jam
18 Kenek Truk 51,000.00 Orang / Hari / 8 Jam
19 Penjaga Malam 63,800.00 Orang / Hari / 8 Jam
PERHITUNGAN BESI BETON DAN BEKISTING / M3
DENGAN PENDEKATAN PERHITUNGAN DI LAPANGAN

Dia Kg/m' Dia Kg/m' Dia Kg/m'


8 0.395 kg 13 1.042 kg 22 2.984 kg
10 0.617 kg 16 1.578 kg 25 3.853 kg
12 0.89 kg 19 2.226 kg 29 5.185 kg

A 1 M3 KOLOM 40 X 60 (lt. dasar GD. REKTORAT)


1 M3 KOLOM 40 X 60 0.4 X 0.6 cover beton = 0.025 m K1=K2
Panjang 1 : 0.4 : 0.6 = 4.16666666666667 M1
50
Besi dia 19 20 dia 19
Besi dia 10 0 dia 0
Begel dia 10 - 0.15 10 50

Besi dia 19 4.17 X 20 X 2.23 KG = = 185.464


Besi dia 10 4.17 X 0 X 0 KG = = 0.000
Begel dia 10 - ( 4.17 : 0.15 ) X ( 0.375 + 0.575 + 0.40 + 0.60 )] X 0.6165 = 33.394
218.858
Bekisting 4.17 X ( 0.4 + 0.6 + 0.4 + 0.6 ) = 8.33333333333333 m2

Beton K275 1.00 X = 0


Besi Polos 33.394 X = 0
Besi Ulir 185.464 X = 0
Bekisting 8.333 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 ok
B 1 M3 KOLOM 40 X 60 (lt. 1-3 GD. REKTORAT)
1 M3 KOLOM 40 X 60 0.4 X 0.6 cover beton = 0.025 m K1
Panjang 1 : 0.4 : 0.6 = 4.16666666666667 M1
50
Besi dia 19 12 dia 19
Besi dia 10 0 dia 0
Begel dia 10 - 0.15 10 50

Besi dia 19 4.17 X 12 X 2.226 KG = = 111.278


Besi dia 10 4.17 X 0 X 0 KG = = 0.000
Begel dia 10 - ( 4.17 : 0.15 ) X ( 0.375 + 0.575 + 0.40 + 0.60 )] X 0.6165 = 33.394
144.672
Bekisting 4.17 X ( 0.4 + 0.6 + 0.4 + 0.6 ) = 8.33333333333333 m2

Beton K275 1.00 X = 0


Besi Polos 33.394 X = 0
Besi Ulir 111.278 X = 0
Bekisting 8.333 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 ok

C 1 M3 KOLOM 40 X 60 (lt. 1-3 GD. REKTORAT)


1 M3 KOLOM 40 X 60 0.4 X 0.6 cover beton = 0.025 m K2
Panjang 1 : 0.4 : 0.6 = 4.16666666666667 M1
50
Besi dia 19 16 dia 19
Besi dia 10 0 dia 0
Begel dia 10 - 0.15 10 50
Besi dia 19 4.17 X 16 X 2.226 KG = = 148.371
Besi dia 10 4.17 X 0 X 0 KG = = 0.000
Begel dia 10 - ( 4.17 : 0.15 ) X ( 0.375 + 0.575 + 0.40 + 0.60 )] X 0.6165 = 33.394
181.765
Bekisting 4.17 X ( 0.4 + 0.6 + 0.4 + 0.6 ) = 8.33333333333333 m2

Beton K275 1.00 X = 0


Besi Polos 33.394 X = 0
Besi Ulir 148.371 X = 0
Bekisting 8.333 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 ok

C 1 M3 KOLOM 40 X 60 (lt. DASAR GD. REKTORAT)


1 M3 KOLOM 40 X 60 0.4 X 0.6 cover beton = 0.025 m K3
Panjang 1 : 0.4 : 0.6 = 4.16666666666667 M1
50
Besi dia 19 24 dia 19
Besi dia 10 0 dia 0
Begel dia 10 - 0.15 10 50

Besi dia 19 4.17 X 24 X 2.226 KG = = 222.557


Besi dia 10 4.17 X 0 X 0 KG = = 0.000
Begel dia 10 - ( 4.17 : 0.15 ) X ( 0.375 + 0.575 + 0.40 + 0.60 )] X 0.6165 = 33.394
255.950
Bekisting 4.17 X ( 0.4 + 0.6 + 0.4 + 0.6 ) = 8.33333333333333 m2

Beton K275 1.00 X = 0


Besi Polos 33.394 X = 0
Besi Ulir 222.557 X = 0
Bekisting 8.333 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 ok

D 1 M3 KOLOM 40 X 60 (LT,1-3 GD. REKTORAT)


1 M3 KOLOM 40 X 60 0.4 X 0.6 cover beton = 0.025 m K3
Panjang 1 : 0.4 : 0.6 = 4.16666666666667 M1
45
Besi dia 19 20 dia 19
Besi dia 10 0 dia 0
Begel dia 10 - 0.15 10 45

Besi dia 19 4.17 X 20 X 2.226 KG = = 185.464


Besi dia 10 4.17 X 0 X 0 KG = = 0.000
Begel dia 10 - ( 4.17 : 0.15 ) X ( 0.375 + 0.575 + 0.40 + 0.60 )] X 0.6165 = 33.394
218.858
Bekisting 4.17 X ( 0.4 + 0.6 + 0.4 + 0.6 ) = 8.33333333333333 m2
Beton K275 1.00 X = 0
Besi Polos 33.394 X = 0
Besi Ulir 185.464 X = 0
Bekisting 8.333 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 ok

E 1 M3 KOLOM 40 X 40 (LT,DASAR GD. REKTORAT)


1 M3 KOLOM 40 X 40 0.4 X 0.4 cover beton = 0.025 m
Panjang 1 : 0.4 : 0.4 = 6.25 M1
45
Besi dia 16 28 dia 16
Besi dia 10 0 dia 0
Begel dia 10 - 0.15 10 45

Besi dia 16 6.25 X 28 X 1.578 KG = = 276.192


Besi dia 10 6.25 X 0 X 0 KG = = 0.000
Begel dia 10 - ( 6.25 : 0.15 ) X ( 0.375 + 0.375 + 0.40 + 0.40 )] X 0.6165 = 39.816
316.008
Bekisting 6.25 X ( 0.4 + 0.4 + 0.4 + 0.4 ) = 10 m2

Beton K275 1.00 X = 0


Besi Polos 39.816 X = 0
Besi Ulir 276.192 X = 0
Bekisting 10.000 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 ok

E 1 M3 KOLOM 40 X 40 (LT, 3 GD. REKTORAT)


1 M3 KOLOM 40 X 40 0.4 X 0.4 cover beton = 0.025 m
Panjang 1 : 0.4 : 0.4 = 6.25 M1
45
Besi dia 16 16 dia 16
Besi dia 10 0 dia 0
Begel dia 10 - 0.15 10 45

Besi dia 16 6.25 X 16 X 1.578 KG = = 157.824


Besi dia 10 6.25 X 0 X 0 KG = = 0.000
Begel dia 10 - ( 6.25 : 0.15 ) X ( 0.375 + 0.375 + 0.40 + 0.40 )] X 0.6165 = 39.816
197.640
Bekisting 6.25 X ( 0.4 + 0.4 + 0.4 + 0.4 ) = 10 m2

Beton K275 1.00 X = 0


Besi Polos 39.816 X = 0
Besi Ulir 157.824 X = 0
Bekisting 10.000 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 ok

E 1 M3 KOLOM 40 X 40 (LT, DAK GD. REKTORAT)


1 M3 KOLOM 40 X 40 0.4 X 0.4 cover beton = 0.025 m
Panjang 1 : 0.4 : 0.4 = 6.25 M1
45
Besi dia 16 12 dia 16
Besi dia 10 0 dia 0
Begel dia 10 - 0.15 10 45

Besi dia 16 6.25 X 12 X 1.578 KG = = 118.368


Besi dia 10 6.25 X 0 X 0 KG = = 0.000
Begel dia 10 - ( 6.25 : 0.15 ) X ( 0.375 + 0.375 + 0.40 + 0.40 )] X 0.6165 = 39.816
158.184
Bekisting 6.25 X ( 0.4 + 0.4 + 0.4 + 0.4 ) = 10 m2

Beton K275 1.00 X = 0


Besi Polos 39.816 X = 0
Besi Ulir 118.368 X = 0
Bekisting 10.000 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 ok

F 1 M3 KOLOM 40 X 40 (LT, DASAR, 1-2 GD. REKTORAT)


1 M3 KOLOM K1 40 X 40 0.4 X 0.4 cover beton = 0.025 m
Panjang 1 : 0.4 : 0.4 = 6.25 M1
45
Besi dia 16 24 dia 16
Besi dia 10 0 dia 0
Begel dia 10 - 0.15 10 45

Besi dia 16 6.25 X 24 X 1.578 KG = = 236.736


Besi dia 10 6.25 X 0 X 0 KG = = 0.000
Begel dia 10 - ( 6.25 : 0.15 ) X ( 0.375 + 0.375 + 0.40 + 0.40 )] X 0.6165 = 39.816
276.552
Bekisting 6.25 X ( 0.4 + 0.4 + 0.4 + 0.4 ) = 10 m2

Beton K275 1.00 X = 0


Besi Polos 39.816 X = 0
Besi Ulir 236.736 X = 0
Bekisting 10.000 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 ok

B 1 M3 KOLOM 40 X 60 (lt. DASAR, 1-2-3 GD. KULIAH))


1 M3 KOLOM 40 X 60 0.4 X 0.6 cover beton = 0.025 m K1
Panjang 1 : 0.4 : 0.6 = 4.16666666666667 M1
50
Besi dia 19 12 dia 19
Besi dia 10 0 dia 0
Begel dia 10 - 0.15 10 50

Besi dia 19 4.17 X 12 X 2.226 KG = = 111.278


Besi dia 10 4.17 X 0 X 0 KG = = 0.000
Begel dia 10 - ( 4.17 : 0.15 ) X ( 0.375 + 0.575 + 0.40 + 0.60 )] X 0.6165 = 33.394
144.672
Bekisting 4.17 X ( 0.4 + 0.6 + 0.4 + 0.6 ) = 8.33333333333333 m2

Beton K275 1.00 X = 0


Besi Polos 33.394 X = 0
Besi Ulir 111.278 X = 0
Bekisting 8.333 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 ok

B 1 M3 KOLOM 40 X 60 (lt. DASAR, 1-2-3 GD. KULIAH))


1 M3 KOLOM 40 X 60 0.4 X 0.6 cover beton = 0.025 m K2
Panjang 1 : 0.4 : 0.6 = 4.16666666666667 M1
50
Besi dia 19 16 dia 19
Besi dia 10 0 dia 0
Begel dia 10 - 0.15 10 50

Besi dia 19 4.17 X 16 X 2.226 KG = = 148.371


Besi dia 10 4.17 X 0 X 0 KG = = 0.000
Begel dia 10 - ( 4.17 : 0.15 ) X ( 0.375 + 0.575 + 0.40 + 0.60 )] X 0.6165 = 33.394
181.765
Bekisting 4.17 X ( 0.4 + 0.6 + 0.4 + 0.6 ) = 8.33333333333333 m2

Beton K275 1.00 X = 0


Besi Polos 33.394 X = 0
Besi Ulir 148.371 X = 0
Bekisting 8.333 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 ok

B 1 M3 KOLOM 40 X 60 (lt. DASAR, 1 GD. KULIAH))


1 M3 KOLOM 40 X 60 0.4 X 0.6 cover beton = 0.025 m K3
Panjang 1 : 0.4 : 0.6 = 4.16666666666667 M1
50
Besi dia 19 20 dia 19
Besi dia 10 0 dia 0
Begel dia 10 - 0.15 10 50

Besi dia 19 4.17 X 20 X 2.226 KG = = 185.464


Besi dia 10 4.17 X 0 X 0 KG = = 0.000
Begel dia 10 - ( 4.17 : 0.15 ) X ( 0.375 + 0.575 + 0.40 + 0.60 )] X 0.6165 = 33.394
218.858
Bekisting 4.17 X ( 0.4 + 0.6 + 0.4 + 0.6 ) = 8.33333333333333 m2

Beton K275 1.00 X = 0


Besi Polos 33.394 X = 0
Besi Ulir 185.464 X = 0
Bekisting 8.333 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 ok

B 1 M3 KOLOM 40 X 60 (lt. 2-3 GD. KULIAH))


1 M3 KOLOM 40 X 60 0.4 X 0.6 cover beton = 0.025 m K3
Panjang 1 : 0.4 : 0.6 = 4.16666666666667 M1
50
Besi dia 19 16 dia 19
Besi dia 10 0 dia 0
Begel dia 10 - 0.15 10 50

Besi dia 19 4.17 X 16 X 2.226 KG = = 148.371


Besi dia 10 4.17 X 0 X 0 KG = = 0.000
Begel dia 10 - ( 4.17 : 0.15 ) X ( 0.375 + 0.575 + 0.40 + 0.60 )] X 0.6165 = 33.394
181.765
Bekisting 4.17 X ( 0.4 + 0.6 + 0.4 + 0.6 ) = 8.33333333333333 m2

Beton K275 1.00 X = 0


Besi Polos 33.394 X = 0
Besi Ulir 148.371 X = 0
Bekisting 8.333 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 ok

B 1 M3 KOLOM 40 X 60 (lt. DASAR-1 GD. KULIAH))


1 M3 KOLOM 40 X 60 0.4 X 0.6 cover beton = 0.025 m K4
Panjang 1 : 0.4 : 0.6 = 4.16666666666667 M1
50
Besi dia 19 20 dia 19
Besi dia 10 0 dia 0
Begel dia 10 - 0.15 10 50

Besi dia 19 4.17 X 20 X 2.226 KG = = 185.464


Besi dia 10 4.17 X 0 X 0 KG = = 0.000
Begel dia 10 - ( 4.17 : 0.15 ) X ( 0.375 + 0.575 + 0.40 + 0.60 )] X 0.6165 = 33.394
218.858
Bekisting 4.17 X ( 0.4 + 0.6 + 0.4 + 0.6 ) = 8.33333333333333 m2

Beton K275 1.00 X = 0


Besi Polos 33.394 X = 0
Besi Ulir 185.464 X = 0
Bekisting 8.333 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 ok

B 1 M3 KOLOM 40 X 60 (lt. DASAR-1 GD. KULIAH))


1 M3 KOLOM 40 X 60 0.4 X 0.6 cover beton = 0.025 m K4
Panjang 1 : 0.4 : 0.6 = 4.16666666666667 M1
50
Besi dia 19 24 dia 19
Besi dia 10 0 dia 0
Begel dia 10 - 0.15 10 50

Besi dia 19 4.17 X 24 X 2.226 KG = = 222.557


Besi dia 10 4.17 X 0 X 0 KG = = 0.000
Begel dia 10 - ( 4.17 : 0.15 ) X ( 0.375 + 0.575 + 0.40 + 0.60 )] X 0.6165 = 33.394
255.950
Bekisting 4.17 X ( 0.4 + 0.6 + 0.4 + 0.6 ) = 8.33333333333333 m2

Beton K275 1.00 X = 0


Besi Polos 33.394 X = 0
Besi Ulir 222.557 X = 0
Bekisting 8.333 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 ok

B 1 M3 KOLOM 50 X 50 ( GD. FLAT DOSEN)


1 M3 KOLOM 50 X 50 0.5 X 0.5 cover beton = 0.025 m K1
Panjang 1 : 0.5 : 0.5 = 4 M1
50
Besi dia 19 16 dia 19
Besi dia 10 0 dia 0
Begel dia 10 - 0.15 10 50

Besi dia 19 4.00 X 16 X 2.226 KG = = 142.436


Besi dia 10 4.00 X 0 X 0 KG = = 0.000
Begel dia 10 - ( 4.00 : 0.15 ) X ( 0.475 + 0.475 + 0.50 + 0.50 )] X 0.6165 = 32.058
174.494
Bekisting 4.00 X ( 0.5 + 0.5 + 0.5 + 0.5 ) = 8 m2

Beton K275 1.00 X = 0


Besi Polos 32.058 X = 0
Besi Ulir 142.436 X = 0
Bekisting 8.000 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 ok

B 1 M3 KOLOM 50 X 50 ( GD. FLAT DOSEN)


1 M3 KOLOM 50 X 50 0.5 X 0.5 cover beton = 0.025 m K2
Panjang 1 : 0.5 : 0.5 = 4 M1
50
Besi dia 19 20 dia 19
Besi dia 10 0 dia 0
Begel dia 10 - 0.15 10 50

Besi dia 19 4.00 X 20 X 2.226 KG = = 178.045


Besi dia 10 4.00 X 0 X 0 KG = = 0.000
Begel dia 10 - ( 4.00 : 0.15 ) X ( 0.475 + 0.475 + 0.50 + 0.50 )] X 0.6165 = 32.058
210.103
Bekisting 4.00 X ( 0.5 + 0.5 + 0.5 + 0.5 ) = 8 m2

Beton K275 1.00 X = 0


Besi Polos 32.058 X = 0
Besi Ulir 178.045 X = 0
Bekisting 8.000 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 ok

B 1 M3 KOLOM 50 X 50 ( GD. FLAT DOSEN)


1 M3 KOLOM 50 X 50 0.5 X 0.5 cover beton = 0.025 m K3
Panjang 1 : 0.5 : 0.5 = 4 M1
50
Besi dia 19 24 dia 19
Besi dia 10 0 dia 0
Begel dia 10 - 0.15 10 50
Besi dia 19 4.00 X 24 X 2.226 KG = = 213.654
Besi dia 10 4.00 X 0 X 0 KG = = 0.000
Begel dia 10 - ( 4.00 : 0.15 ) X ( 0.475 + 0.475 + 0.50 + 0.50 )] X 0.6165 = 32.058
245.712
Bekisting 4.00 X ( 0.5 + 0.5 + 0.5 + 0.5 ) = 8 m2

Beton K275 1.00 X = 0


Besi Polos 32.058 X = 0
Besi Ulir 213.654 X = 0
Bekisting 8.000 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 ok

B 1 M3 KOLOM 50 X 50 ( GD. FLAT DOSEN)


1 M3 KOLOM 50 X 50 0.5 X 0.5 cover beton = 0.025 m K4
Panjang 1 : 0.5 : 0.5 = 4 M1
50
Besi dia 19 28 dia 19
Besi dia 10 0 dia 0
Begel dia 10 - 0.15 10 50

Besi dia 19 4.00 X 28 X 2.226 KG = = 249.263


Besi dia 10 4.00 X 0 X 0 KG = = 0.000
Begel dia 10 - ( 4.00 : 0.15 ) X ( 0.475 + 0.475 + 0.50 + 0.50 )] X 0.6165 = 32.058
281.321
Bekisting 4.00 X ( 0.5 + 0.5 + 0.5 + 0.5 ) = 8 m2

Beton K275 1.00 X = 0


Besi Polos 32.058 X = 0
Besi Ulir 249.263 X = 0
Bekisting 8.000 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 ok

B 1 M3 KOLOM 50 X 50 ( GD. FLAT DOSEN)


1 M3 KOLOM 50 X 50 0.5 X 0.5 cover beton = 0.025 m K5
Panjang 1 : 0.5 : 0.5 = 4 M1
50
Besi dia 19 32 dia 19
Besi dia 10 0 dia 0
Begel dia 10 - 0.15 10 50

Besi dia 19 4.00 X 32 X 2.226 KG = = 284.872


Besi dia 10 4.00 X 0 X 0 KG = = 0.000
Begel dia 10 - ( 4.00 : 0.15 ) X ( 0.475 + 0.475 + 0.50 + 0.50 )] X 0.6165 = 32.058
316.930
Bekisting 4.00 X ( 0.5 + 0.5 + 0.5 + 0.5 ) = 8 m2

Beton K275 1.00 X = 0


Besi Polos 32.058 X = 0
Besi Ulir 284.872 X = 0
Bekisting 8.000 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 ok

B 1 M3 KOLOM 30 X 60 ( GD. ASRAMA)


1 M3 KOLOM 30 X 60 0.3 X 0.6 cover beton = 0.025 m K1
Panjang 1 : 0.3 : 0.6 = 5.55555555555556 M1
50
Besi dia 16 16 dia 16
Besi dia 10 0 dia 0
Begel dia 10 - 0.15 10 50

Besi dia 16 5.56 X 16 X 1.578 KG = = 140.288


Besi dia 10 5.56 X 0 X 0 KG = = 0.000
Begel dia 10 - ( 5.56 : 0.15 ) X ( 0.275 + 0.575 + 0.30 + 0.60 )] X 0.6165 = 39.958
180.246
Bekisting 5.56 X ( 0.3 + 0.6 + 0.3 + 0.6 ) = 10 m2

Beton K275 1.00 X = 0


Besi Polos 39.958 X = 0
Besi Ulir 140.288 X = 0
Bekisting 10.000 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 ok
B 1 M3 KOLOM 30 X 60 ( GD. ASRAMA)
1 M3 KOLOM 30 X 60 0.3 X 0.6 cover beton = 0.025 m K2
Panjang 1 : 0.3 : 0.6 = 5.55555555555556 M1
50
Besi dia 16 20 dia 16
Besi dia 10 0 dia 0
Begel dia 10 - 0.15 10 50

Besi dia 16 5.56 X 20 X 1.578 KG = = 175.360


Besi dia 10 5.56 X 0 X 0 KG = = 0.000
Begel dia 10 - ( 5.56 : 0.15 ) X ( 0.275 + 0.575 + 0.30 + 0.60 )] X 0.6165 = 39.958
215.318
Bekisting 5.56 X ( 0.3 + 0.6 + 0.3 + 0.6 ) = 10 m2

Beton K275 1.00 X = 0


Besi Polos 39.958 X = 0
Besi Ulir 175.360 X = 0
Bekisting 10.000 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 ok

B 1 M3 KOLOM 30 X 30 ( GD. ASRAMA)


1 M3 KOLOM 30 X 30 0.3 X 0.3 cover beton = 0.025 m K1
Panjang 1 : 0.3 : 0.3 = 11.1111111111111 M1
50
Besi dia 16 12 dia 16
Besi dia 10 0 dia 0
Begel dia 10 - 0.15 10 50

Besi dia 16 11.11 X 12 X 1.578 KG = = 210.432


Besi dia 10 11.11 X 0 X 0 KG = = 0.000
Begel dia 10 - ( 11.11 : 0.15 ) X ( 0.275 + 0.275 + 0.30 + 0.30 )] X 0.6165 = 52.517
262.949
Bekisting 11.11 X ( 0.3 + 0.3 + 0.3 + 0.3 ) = 13.3333333333333 m2

Beton K275 1.00 X = 0


Besi Polos 52.517 X = 0
Besi Ulir 210.432 X = 0
Bekisting 13.333 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 ok

G 1 M3 KOLOM 30 X 30 (K2)
1 M3 KOLOM K2 30 X 30 0.3 X 0.3 cover beton = 0.025 m
Panjang 1 : 0.3 : 0.3 = 11.1111111111111 M1

Besi dia 16 6 dia 16


Besi dia 13 dia
Begel dia 8 - 0.15 8

Besi dia 16 11.11 X 6 X 1.578 KG = = 105.216


Besi dia 13 11.11 X 0 X 0 KG = = 0.000
Begel dia 8 - ( 11.11 : 0.15 ) X ( 0.275 + 0.275 + 0.30 + 0.30 )] X 0.3946 = 33.611
138.827
Bekisting 11.11 X ( 0.3 + 0.3 + 0.3 + 0.3 ) = 13.3333333333333 m2

Beton K275 1.00 X = 0


Besi Polos 33.611 X = 0
Besi Ulir 105.216 X = 0
Bekisting 13.333 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 ok
H 1 M3 KOLOM K3 25 X 25
1 M3 KOLOM K3 25 X 25 0.25 X 0.25 cover beton = 0.025 m
Panjang 1 : 0.25 : 0.25 = 16 M1

Besi dia 13 4 dia 13


Besi dia 10 0 dia 0
Begel dia 8 - 0.15 8

Besi dia 13 16.00 X 4 X 1.042 KG = = 66.681


Besi dia 10 16.00 X 0 X 0 KG = = 0.000
Begel dia 8 - ( 16.00 : 0.15 ) X ( 0.225 + 0.225 + 0.25 + 0.25 )] X 0.3946 = 39.982
106.663
Bekisting 16.00 X ( 0.25 + 0.25 + 0.25 + 0.25 ) = 16 m2

Beton K275 1.00 X = 0


Besi Polos 39.982 X = 0
Besi Ulir 66.681 X = 0
Bekisting 16.000 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 ok

H 1 M3 KOLOM K4 20 X 40
1 M3 KOLOM K4 20 X 40 0.2 X 0.4 cover beton = 0.025 m
Panjang 1 : 0.2 : 0.4 = 12.5 M1

Besi dia 13 6 dia 13


Besi dia 10 0 dia 0
Begel dia 8 - 0.15 8

Besi dia 13 12.50 X 6 X 1.042 KG = = 78.141


Besi dia 10 12.50 X 0 X 0 KG = = 0.000
Begel dia 8 - ( 12.50 : 0.15 ) X ( 0.175 + 0.375 + 0.20 + 0.40 )] X 0.3946 = 37.812
115.953
Bekisting 12.50 X ( 0.2 + 0.4 + 0.2 + 0.4 ) = 15 m2

Beton K275 1.00 X = 0


Besi Polos 37.812 X = 0
Besi Ulir 78.141 X = 0
Bekisting 15.000 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 ok

H 1 M3 KOLOM K5 15 X 35
1 M3 KOLOM K5 15 X 35 0.15 X 0.35 cover beton = 0.025 m
Panjang 1 : 0.15 : 0.35 = 19.0476190476191 M1

Besi dia 12 6 dia 12


Besi dia 10 0 dia 0
Begel dia 8 - 0.15 8

Besi dia 12 19.05 X 6 X 0.888 KG = = 101.458


Besi dia 10 19.05 X 0 X 0 KG = = 0.000
Begel dia 8 - ( 19.05 : 0.15 ) X ( 0.125 + 0.325 + 0.15 + 0.35 )] X 0.3946 = 47.598
149.056
Bekisting 19.05 X ( 0.15 + 0.35 + 0.15 + 0.35 ) = 19.0476190476191 m2
Beton K275 1.00 X = 0
Besi Polos 149.056 X = 0
Besi Ulir X = 0
Bekisting 19.048 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 ok

I 1 M3 KOLOM KP 15 X 15
1 M3 KOLOM KP 15 X 15 0.15 X 0.15 cover beton = 0.025 m
Panjang 1 : 0.15 : 0.15 = 44.4444444444444 M1
30
Besi dia 12 dia
Besi dia 12 4 dia 12
Begel dia 8 - 0.2 8 30

Besi dia 12 44.44 X 0 X 0 KG = = 0.000


Besi dia 10 44.44 X 4 X 0.888 KG = = 157.824
Begel dia 8 - ( 44.44 : 0.2 ) X ( 0.125 + 0.125 + 0.15 + 0.15 )] X 0.3946 = 48.224
206.048
Bekisting 44.44 X ( 0.15 + 0.15 + 0.15 + 0.15 ) = 26.6666666666667 m2

Beton K275 1.00 X = 0


Besi Polos 206.048 X = 0
Besi Ulir 0.000 X = 0
Bekisting 26.667 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 ok

I 1 M3 KOLOM 30 X 30 (K2" Lt1, Lt2, Lt3, Lt4, Lt5, Lt6)


1 M3 KOLOM 30 X 30 0.3 X 0.3 cover beton = 0.025 m
Panjang 1 : 0.3 : 0.3 = 11.1111111111111 M1
30
Besi dia 19 4 dia 19
Besi dia 10 0 dia 0
Begel dia 10 - 0.15 10 30

Besi dia 19 11.11 X 4 X 2.226 KG = = 98.914


Besi dia 10 11.11 X 0 X 0 KG = = 0.000
Begel dia 10 - ( 11.11 : 0.15 ) X ( 0.275 + 0.275 + 0.30 + 0.30 )] X 0.6165 = 52.517
151.431
Bekisting 11.11 X ( 0.3 + 0.3 + 0.3 + 0.3 ) = 13.3333333333333 m2

Beton K275 1.00 X = 0


Besi Polos 52.517 X = 0
Besi Ulir 98.914 X = 0
Bekisting 13.333 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 ok

J 1 M3 KOLOM 30 X 30 (K2" TR)


1 M3 KOLOM 30 X 30 0.3 X 0.3 cover beton = 0.025 m
Panjang 1 : 0.3 : 0.3 = 11.1111111111111 M1
30
Besi dia 19 8 dia 19
Besi dia 10 0 dia 0
Begel dia 10 - 0.15 10 30

Besi dia 19 11.11 X 8 X 2.226 KG = = 197.828


Besi dia 10 11.11 X 0 X 0 KG = = 0.000
Begel dia 10 - ( 11.11 : 0.15 ) X ( 0.275 + 0.275 + 0.30 + 0.30 )] X 0.6165 = 52.517
250.345
Bekisting 11.11 X ( 0.3 + 0.3 + 0.3 + 0.3 ) = 13.3333333333333 m2

Beton K275 1.00 X = 0


Besi Polos 52.517 X = 0
Besi Ulir 197.828 X = 0
Bekisting 13.333 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 ok

K 1 M3 KOLOM 30 X 30 (K2"' Lt1, Lt2, TR)


1 M3 KOLOM 30 X 30 0.3 X 0.3 cover beton = 0.025 m
Panjang 1 : 0.3 : 0.3 = 11.1111111111111 M1
30
Besi dia 19 8 dia 19
Besi dia 10 0 dia 0
Begel dia 10 - 0.15 10 30

Besi dia 19 11.11 X 8 X 2.226 KG = = 197.828


Besi dia 10 11.11 X 0 X 0 KG = = 0.000
Begel dia 10 - ( 11.11 : 0.15 ) X ( 0.275 + 0.275 + 0.30 + 0.30 )] X 0.6165 = 52.517
250.345
Bekisting 11.11 X ( 0.3 + 0.3 + 0.3 + 0.3 ) = 13.3333333333333 m2

Beton K275 1.00 X = 0


Besi Polos 52.517 X = 0
Besi Ulir 197.828 X = 0
Bekisting 13.333 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 ok

L 1 M3 KOLOM 30 X 30 (K2"' Lt3, Lt4, Lt5, Lt6)


1 M3 KOLOM 30 X 30 0.3 X 0.3 cover beton = 0.025 m
Panjang 1 : 0.3 : 0.3 = 11.1111111111111 M1
30
Besi dia 19 4 dia 19
Besi dia 10 0 dia 0
Begel dia 10 - 0.15 10 30

Besi dia 19 11.11 X 4 X 2.226 KG = = 98.914


Besi dia 10 11.11 X 0 X 0 KG = = 0.000
Begel dia 10 - ( 11.11 : 0.15 ) X ( 0.275 + 0.275 + 0.30 + 0.30 )] X 0.6165 = 52.517
151.431
Bekisting 11.11 X ( 0.3 + 0.3 + 0.3 + 0.3 ) = 13.3333333333333 m2

Beton K275 1.00 X = 0


Besi Polos 52.517 X = 0
Besi Ulir 98.914 X = 0
Bekisting 13.333 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 ok

M 1 M3 KOLOM 30 X 100 (K3 Lt1)


1 M3 KOLOM 30 X 100 0.3 X 1 cover beton = 0.025 m
Panjang 1 : 0.3 : 1= 3.33333333333333 M1

Besi dia 16 40 dia 16


Besi dia 10 0 dia 0
Begel dia 10 - 0.15 10 100

Besi dia 16 3.33 X 40 X 1.578 KG = = 210.432


Besi dia 10 3.33 X 0 X 0 KG = = 0.000
Begel dia 10 - ( 3.33 : 0.15 ) X ( 0.275 + 0.975 + 0.30 + 1.00 )] X 0.6165 = 34.935
245.367
Bekisting 3.33 X ( 0.3 + 1+ 0.3 + 1) = 8.66666666666667 m2

Beton K275 1.00 X = 0


Besi Polos 34.935 X = 0
Besi Ulir 210.432 X = 0
Bekisting 8.667 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 ok

N 1 M3 KOLOM 30 X 100 (K3 Lt2)


1 M3 KOLOM 30 X 100 0.3 X 1 cover beton = 0.025 m
Panjang 1 : 0.3 : 1= 3.33333333333333 M1

Besi dia 16 32 dia 19


Besi dia 10 0 dia 0
Begel dia 10 - 0.15 10 100

Besi dia 16 3.33 X 32 X 2.226 KG = = 237.394


Besi dia 10 3.33 X 0 X 0 KG = = 0.000
Begel dia 10 - ( 3.33 : 0.15 ) X ( 0.275 + 0.975 + 0.30 + 1.00 )] X 0.6165 = 34.935
272.329
Bekisting 3.33 X ( 0.3 + 1+ 0.3 + 1) = 8.66666666666667 m2

Beton K275 1.00 X = 0


Besi Polos 34.935 X = 0
Besi Ulir 237.394 X = 0
Bekisting 8.667 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 ok

O 1 M3 KOLOM 30 X 100 (K3 Lt3, Lt4, Lt5, Lt6, TR)


1 M3 KOLOM 30 X 100 0.3 X 1 cover beton = 0.025 m
Panjang 1 : 0.3 : 1= 3.33333333333333 M1

Besi dia 16 16 dia 19


Besi dia 10 0 dia 0
Begel dia 10 - 0.15 10 100

Besi dia 16 3.33 X 16 X 2.226 KG = = 118.697


Besi dia 10 3.33 X 0 X 0 KG = = 0.000
Begel dia 10 - ( 3.33 : 0.15 ) X ( 0.275 + 0.975 + 0.30 + 1.00 )] X 0.6165 = 34.935
153.632
Bekisting 3.33 X ( 0.3 + 1+ 0.3 + 1) = 8.66666666666667 m2

Beton K275 1.00 X = 0


Besi Polos 34.935 X = 0
Besi Ulir 118.697 X = 0
Bekisting 8.667 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 ok

P 1 M3 BALOK 30 X 60 (LT, 1-2-3)


1 M3 BALOK B1 30 X 60 0.3 X 0.6 cover beton = 0.025 m B1

Panjang 1 : 0.3 : 0.6 = 5.55555555555556 M1

Besi dia 19 17 dia 19


Besi dia 10 2 dia 10
Begel dia 10 - 0.15 10

Besi dia 19 5.56 X 17 X 2.226 KG = = 210.192


Besi dia 10 5.56 X 2 X 0.617 KG = = 6.850
Begel dia 10 - ( 5.56 : 0.15 ) X ( 0.275 + 0.575 + 0.3 + 0.6 )] X 0.6165 = 39.958
257.001
Bekisting 5.56 X ( 0.3 + 0.6 + 0.3 + 0.6 ) = 10 m2
Beton K275 1.00 X = 0
Besi Polos 46.808 X = 0
Besi Ulir 210.192 X = 0
Bekisting 10.000 X = 0
Jumlah 0
Keuntungan 0
Jumlah Total 0
DIBULATKAN 0 OK
Q 1 M3 BALOK 30 X 60 (LT, 1-2-3)
1 M3 BALOK B2 30 X 60 0.3 X 0.6 cover beton = 0.025 m

Panjang 1 : 0.3 : 0.6 = 5.55555555555556 M1

Besi dia 19 15 dia 19


Besi dia 10 2 dia 10
Begel dia 10 - 0.15 10

Besi dia 19 5.56 X 15 X 2.226 KG = = 185.464


Besi dia 10 5.56 X 2 X 0.617 KG = = 6.850
Begel dia 10 - ( 5.56 : 0.15 ) X ( 0.275 + 0.575 + 0.3 + 0.6 )] X 0.6165 = 39.958
232.272
Bekisting 5.56 X ( 0.3 + 0.6 + 0.3 + 0.6 ) = 10 m2

Beton K275 1.00 X = 0


Besi Polos 46.808 X = 0
Besi Ulir 185.464 X = 0
Bekisting 10.000 X = 0
Jumlah 0
Keuntungan 0
Jumlah Total 0
DIBULATKAN 0 OK
R 1 M3 BALOK 30 X 60 (LT, 1-2-3)
1 M3 BALOK B3 30 X 60 0.3 X 0.6 cover beton = 0.025 m

Panjang 1 : 0.3 : 0.6 = 5.55555555555556 M1

Besi dia 19 11 dia 19


Besi dia 10 2 dia 10
Begel dia 10 - 0.15 10

Besi dia 19 5.56 X 11 X 2.226 KG = = 136.007


Besi dia 10 5.56 X 2 X 0.617 KG = = 6.850
Begel dia 10 - ( 5.56 : 0.15 ) X ( 0.275 + 0.575 + 0.3 + 0.6 )] X 0.6165 = 39.958
182.815
Bekisting 5.56 X ( 0.3 + 0.6 + 0.3 + 0.6 ) = 10 m2

Beton K275 1.00 X = 0


Besi Polos 46.808 X = 0
Besi Ulir 136.007 X = 0
Bekisting 10.000 X = 0
Jumlah 0
Keuntungan 0
Jumlah Total 0
DIBULATKAN 0 OK
R 1 M3 BALOK 30 X 50 (LT, 1-2-3)
1 M3 BALOK B4 30 X 50 0.3 X 0.5 cover beton = 0.025 m

Panjang 1 : 0.3 : 0.5 = 6.66666666666667 M1

Besi dia 19 13 dia 19


Besi dia 10 2 dia 10
Begel dia 10 - 0.15 10

Besi dia 19 6.67 X 13 X 2.226 KG = = 192.882


Besi dia 10 6.67 X 2 X 0.617 KG = = 8.220
Begel dia 10 - ( 6.67 : 0.15 ) X ( 0.275 + 0.475 + 0.3 + 0.5 )] X 0.6165 = 42.470
243.572
Bekisting 6.67 X ( 0.3 + 0.5 + 0.3 + 0.5 ) = 10.6666666666667 m2

Beton K275 1.00 X = 0


Besi Polos 50.690 X = 0
Besi Ulir 192.882 X = 0
Bekisting 10.667 X = 0
Jumlah 0
Keuntungan 0
Jumlah Total 0
DIBULATKAN 0 OK
R 1 M3 BALOK 30 X 50 (LT, 1-2-3)
1 M3 BALOK B5 30 X 50 0.3 X 0.5 cover beton = 0.025 m

Panjang 1 : 0.3 : 0.5 = 6.66666666666667 M1

Besi dia 19 11 dia 19


Besi dia 10 2 dia 10
Begel dia 10 - 0.15 10

Besi dia 19 6.67 X 11 X 2.226 KG = = 163.208


Besi dia 10 6.67 X 2 X 0.617 KG = = 8.220
Begel dia 10 - ( 6.67 : 0.15 ) X ( 0.275 + 0.475 + 0.3 + 0.5 )] X 0.6165 = 42.470
213.898
Bekisting 6.67 X ( 0.3 + 0.5 + 0.3 + 0.5 ) = 10.6666666666667 m2

Beton K275 1.00 X = 0


Besi Polos 50.690 X = 0
Besi Ulir 163.208 X = 0
Bekisting 10.667 X = 0
Jumlah 0
Keuntungan 0
Jumlah Total 0
DIBULATKAN 0 OK
R 1 M3 BALOK 20 X 40 (LT, 1-2-3)
1 M3 BALOK RB1 20 X 40 0.2 X 0.4 cover beton = 0.025 m

Panjang 1 : 0.2 : 0.4 = 12.5 M1

Besi dia 16 8 dia 16


Besi dia 10 2 dia 10
Begel dia 10 - 0.15 10

Besi dia 16 12.50 X 8 X 1.578 KG = = 157.824


Besi dia 10 12.50 X 2 X 0.617 KG = = 15.413
Begel dia 10 - ( 12.50 : 0.15 ) X ( 0.175 + 0.375 + 0.2 + 0.4 )] X 0.6165 = 59.081
232.318
Bekisting 12.50 X ( 0.2 + 0.4 + 0.2 + 0.4 ) = 15 m2

Beton K275 1.00 X = 0


Besi Polos 74.494 X = 0
Besi Ulir 157.824 X = 0
Bekisting 15.000 X = 0
Jumlah 0
Keuntungan 0
Jumlah Total 0
DIBULATKAN 0 OK
R 1 M3 BALOK 30 X 50 (LT, DAK)
1 M3 BALOK B1 30 X 50 0.3 X 0.5 cover beton = 0.025 m

Panjang 1 : 0.3 : 0.5 = 6.66666666666667 M1

Besi dia 19 11 dia 19


Besi dia 10 2 dia 10
Begel dia 10 - 0.15 10

Besi dia 19 6.67 X 11 X 2.226 KG = = 163.208


Besi dia 10 6.67 X 2 X 0.617 KG = = 8.220
Begel dia 10 - ( 6.67 : 0.15 ) X ( 0.275 + 0.475 + 0.3 + 0.5 )] X 0.6165 = 42.470
213.898
Bekisting 6.67 X ( 0.3 + 0.5 + 0.3 + 0.5 ) = 10.6666666666667 m2

Beton K275 1.00 X = 0


Besi Polos 50.690 X = 0
Besi Ulir 163.208 X = 0
Bekisting 10.667 X = 0
Jumlah 0
Keuntungan 0
Jumlah Total 0
DIBULATKAN 0 OK
R 1 M3 BALOK 30 X 50 (LT, DAK)
1 M3 BALOK B2 30 X 50 0.3 X 0.5 cover beton = 0.025 m

Panjang 1 : 0.3 : 0.5 = 6.66666666666667 M1

Besi dia 19 7 dia 19


Besi dia 10 2 dia 10
Begel dia 10 - 0.15 10

Besi dia 19 6.67 X 7 X 2.226 KG = = 103.860


Besi dia 10 6.67 X 2 X 0.617 KG = = 8.220
Begel dia 10 - ( 6.67 : 0.15 ) X ( 0.275 + 0.475 + 0.3 + 0.5 )] X 0.6165 = 42.470
154.550
Bekisting 6.67 X ( 0.3 + 0.5 + 0.3 + 0.5 ) = 10.6666666666667 m2

Beton K275 1.00 X = 0


Besi Polos 50.690 X = 0
Besi Ulir 103.860 X = 0
Bekisting 10.667 X = 0
Jumlah 0
Keuntungan 0
Jumlah Total 0
DIBULATKAN 0 OK
R 1 M3 BALOK 20 X 40 (LT, DAK)
1 M3 BALOK B3 20 X 40 0.2 X 0.4 cover beton = 0.025 m

Panjang 1 : 0.2 : 0.4 = 12.5 M1

Besi dia 16 8 dia 16


Besi dia 10 2 dia 10
Begel dia 10 - 0.15 10

Besi dia 16 12.50 X 8 X 1.578 KG = = 157.824


Besi dia 10 12.50 X 2 X 0.617 KG = = 15.413
Begel dia 10 - ( 12.50 : 0.15 ) X ( 0.175 + 0.375 + 0.2 + 0.4 )] X 0.6165 = 59.081
232.318
Bekisting 12.50 X ( 0.2 + 0.4 + 0.2 + 0.4 ) = 15 m2

Beton K275 1.00 X = 0


Besi Polos 74.494 X = 0
Besi Ulir 157.824 X = 0
Bekisting 15.000 X = 0
Jumlah 0
Keuntungan 0
Jumlah Total 0
DIBULATKAN 0 OK
R 1 M3 BALOK 20 X 40 (LT, DAK)
1 M3 BALOK B4 20 X 40 0.2 X 0.4 cover beton = 0.025 m

Panjang 1 : 0.2 : 0.4 = 12.5 M1

Besi dia 16 5 dia 16


Besi dia 10 2 dia 10
Begel dia 10 - 0.15 10

Besi dia 16 12.50 X 5 X 1.578 KG = = 98.640


Besi dia 10 12.50 X 2 X 0.617 KG = = 15.413
Begel dia 10 - ( 12.50 : 0.15 ) X ( 0.175 + 0.375 + 0.2 + 0.4 )] X 0.6165 = 59.081
173.134
Bekisting 12.50 X ( 0.2 + 0.4 + 0.2 + 0.4 ) = 15 m2

Beton K275 1.00 X = 0


Besi Polos 74.494 X = 0
Besi Ulir 98.640 X = 0
Bekisting 15.000 X = 0
Jumlah 0
Keuntungan 0
Jumlah Total 0
DIBULATKAN 0 OK
R 1 M3 BALOK 35 X 70 (LT-1)
1 M3 BALOK B1 35 X 70 0.35 X 0.7 cover beton = 0.025 m

Panjang 1 : 0.35 : 0.7 = 4.08163265306122 M1

Besi dia 19 14 dia 19


Besi dia 10 2 dia 10
Begel dia 10 - 0.15 10

Besi dia 19 4.08 X 14 X 2.226 KG = = 127.175


Besi dia 10 4.08 X 2 X 0.617 KG = = 5.033
Begel dia 10 - ( 4.08 : 0.15 ) X ( 0.325 + 0.675 + 0.35 + 0.7 )] X 0.6165 = 34.390
166.598
Bekisting 4.08 X ( 0.35 + 0.7 + 0.35 + 0.7 ) = 8.57142857142857 m2

Beton K275 1.00 X = 0


Besi Polos 39.422 X = 0
Besi Ulir 127.175 X = 0
Bekisting 8.571 X = 0
Jumlah 0
Keuntungan 0
Jumlah Total 0
DIBULATKAN 0 OK
R 1 M3 BALOK 30 X 50 (LT-1)
1 M3 BALOK B2 30 X 50 0.3 X 0.5 cover beton = 0.025 m

Panjang 1 : 0.3 : 0.5 = 6.66666666666667 M1

Besi dia 16 19 dia 16


Besi dia 10 2 dia 10
Begel dia 10 - 0.15 10

Besi dia 16 6.67 X 19 X 1.578 KG = = 199.910


Besi dia 10 6.67 X 2 X 0.617 KG = = 8.220
Begel dia 10 - ( 6.67 : 0.15 ) X ( 0.275 + 0.475 + 0.3 + 0.5 )] X 0.6165 = 42.470
250.600
Bekisting 6.67 X ( 0.3 + 0.5 + 0.3 + 0.5 ) = 10.6666666666667 m2

Beton K275 1.00 X = 0


Besi Polos 50.690 X = 0
Besi Ulir 199.910 X = 0
Bekisting 10.667 X = 0
Jumlah 0
Keuntungan 0
Jumlah Total 0
DIBULATKAN 0 OK
R 1 M3 BALOK 20 X 30 (LT-1)
1 M3 BALOK B3 20 X 30 0.2 X 0.3 cover beton = 0.025 m

Panjang 1 : 0.2 : 0.3 = 16.6666666666667 M1

Besi dia 16 6 dia 16


Besi dia 10 2 dia 10
Begel dia 10 - 0.15 10

Besi dia 16 16.67 X 6 X 1.578 KG = = 157.824


Besi dia 10 16.67 X 2 X 0.617 KG = = 20.550
Begel dia 10 - ( 16.67 : 0.15 ) X ( 0.175 + 0.275 + 0.2 + 0.3 )] X 0.6165 = 65.075
243.449
Bekisting 16.67 X ( 0.2 + 0.3 + 0.2 + 0.3 ) = 16.6666666666667 m2
Beton K275 1.00 X = 0
Besi Polos 85.625 X = 0
Besi Ulir 157.824 X = 0
Bekisting 16.667 X = 0
Jumlah 0
Keuntungan 0
Jumlah Total 0
DIBULATKAN 0 OK
R 1 M3 BALOK 25 X 50 (LT-1)
1 M3 BALOK B1 25 X 50 0.25 X 0.5 cover beton = 0.025 m

Panjang 1 : 0.25 : 0.5 = 8 M1

Besi dia 16 21 dia 16


Besi dia 10 2 dia 10
Begel dia 10 - 0.15 10

Besi dia 16 8.00 X 21 X 1.578 KG = = 265.144


Besi dia 10 8.00 X 2 X 0.617 KG = = 9.864
Begel dia 10 - ( 8.00 : 0.15 ) X ( 0.225 + 0.475 + 0.25 + 0.5 )] X 0.6165 = 47.676
322.684
Bekisting 8.00 X ( 0.25 + 0.5 + 0.25 + 0.5 ) = 12 m2

Beton K275 1.00 X = 0


Besi Polos 57.540 X = 0
Besi Ulir 265.144 X = 0
Bekisting 12.000 X = 0
Jumlah 0
Keuntungan 0
Jumlah Total 0
DIBULATKAN 0 OK
R 1 M3 BALOK 20 X 40 (LT-1)
1 M3 BALOK B1 20 X 40 0.2 X 0.4 cover beton = 0.025 m

Panjang 1 : 0.2 : 0.4 = 12.5 M1

Besi dia 16 6 dia 16


Besi dia 10 2 dia 10
Begel dia 10 - 0.15 10
Besi dia 16 12.50 X 6 X 1.578 KG = = 118.368
Besi dia 10 12.50 X 2 X 0.617 KG = = 15.413
Begel dia 10 - ( 12.50 : 0.15 ) X ( 0.175 + 0.375 + 0.2 + 0.4 )] X 0.6165 = 59.081
192.862
Bekisting 12.50 X ( 0.2 + 0.4 + 0.2 + 0.4 ) = 15 m2

Beton K275 1.00 X = 0


Besi Polos 74.494 X = 0
Besi Ulir 118.368 X = 0
Bekisting 15.000 X = 0
Jumlah 0
Keuntungan 0
Jumlah Total 0
DIBULATKAN 0 OK
R 1 M3 BALOK 20 X 40 (LT-1)
1 M3 BALOK B1 20 X 40 0.2 X 0.4 cover beton = 0.025 m

Panjang 1 : 0.2 : 0.4 = 12.5 M1

Besi dia 16 5 dia 16


Besi dia 10 2 dia 10
Begel dia 10 - 0.15 10

Besi dia 16 12.50 X 5 X 1.578 KG = = 98.640


Besi dia 10 12.50 X 2 X 0.617 KG = = 15.413
Begel dia 10 - ( 12.50 : 0.15 ) X ( 0.175 + 0.375 + 0.2 + 0.4 )] X 0.6165 = 59.081
173.134
Bekisting 12.50 X ( 0.2 + 0.4 + 0.2 + 0.4 ) = 15 m2

Beton K275 1.00 X = 0


Besi Polos 74.494 X = 0
Besi Ulir 98.640 X = 0
Bekisting 15.000 X = 0
Jumlah 0
Keuntungan 0
Jumlah Total 0
DIBULATKAN 0 OK
R 1 M3 BALOK 25 X 50 (LT. DASAR, 1-2) ASRAMA
1 M3 BALOK B1 25 X 50 0.25 X 0.5 cover beton = 0.025 m
Panjang 1 : 0.25 : 0.5 = 8 M1

Besi dia 16 19 dia 16


Besi dia 10 2 dia 10
Begel dia 10 - 0.15 10

Besi dia 16 8.00 X 19 X 1.578 KG = = 239.892


Besi dia 10 8.00 X 2 X 0.617 KG = = 9.864
Begel dia 10 - ( 8.00 : 0.15 ) X ( 0.225 + 0.475 + 0.25 + 0.5 )] X 0.6165 = 47.676
297.432
Bekisting 8.00 X ( 0.25 + 0.5 + 0.25 + 0.5 ) = 12 m2

Beton K275 1.00 X = 0


Besi Polos 57.540 X = 0
Besi Ulir 239.892 X = 0
Bekisting 12.000 X = 0
Jumlah 0
Keuntungan 0
Jumlah Total 0
DIBULATKAN 0 OK
R 1 M3 BALOK 25 X 40 (LT. DASAR, 1-2) ASRAMA
1 M3 BALOK B2 20 X 40 0.2 X 0.4 cover beton = 0.025 m

Panjang 1 : 0.2 : 0.4 = 12.5 M1

Besi dia 16 9 dia 16


Besi dia 10 2 dia 10
Begel dia 10 - 0.15 10

Besi dia 16 12.50 X 9 X 1.578 KG = = 177.552


Besi dia 10 12.50 X 2 X 0.617 KG = = 15.413
Begel dia 10 - ( 12.50 : 0.15 ) X ( 0.175 + 0.375 + 0.2 + 0.4 )] X 0.6165 = 59.081
252.046
Bekisting 12.50 X ( 0.2 + 0.4 + 0.2 + 0.4 ) = 15 m2

Beton K275 1.00 X = 0


Besi Polos 74.494 X = 0
Besi Ulir 177.552 X = 0
Bekisting 15.000 X = 0
Jumlah 0
Keuntungan 0
Jumlah Total 0
DIBULATKAN 0 OK
S
1 M3 BALOK B4 25 X 40 0.25 X 0.4 cover beton = 0.025 m

Panjang 1 : 0.25 : 0.4 = 10 M1

Besi dia 16 6 dia 16


Besi dia 12 0 dia 12
Begel dia 8 - 0.1 8
Besi dia 16 10.00 X 6 X 1.578 KG = = 94.694
Besi dia 12 10.00 X 0 X 0.888 KG = = 0.000
Begel dia 8 - ( 10.00 : 0.1 ) X ( 0.225 + 0.375 + 0.25 + 0.4 )] X 0.3946 = 49.320
144.014
Bekisting 10.00 X ( 0.25 + 0.4 + 0.25 + 0.4 ) = 13 m2

Beton K275 1.00 X = 0


Besi Polos 49.320 X = 0
Besi Ulir 94.694 X = 0
Bekisting 13.000 X = 0
Jumlah 0
Keuntungan 0
Jumlah Total 0
DIBULATKAN 0 OK
T
1 M3 BALOK B5 20 X 35 0.2 X 0.35 cover beton = 0.025 m

Panjang 1 : 0.2 : 0.35 = 14.2857142857143 M1

Besi dia 16 5 dia 16


Besi dia 12 0 dia 12
Begel dia 8 - 0.1 8

Besi dia 16 14.29 X 5 X 1.578 KG = = 112.731


Besi dia 12 14.29 X 0 X 0.888 KG = = 0.000
Begel dia 8 - ( 14.29 : 0.1 ) X ( 0.175 + 0.325 + 0.2 + 0.35 )] X 0.3946 = 59.184
171.915
Bekisting 14.29 X ( 0.2 + 0.35 + 0.2 + 0.35 ) = 15.7142857142857 m2
Beton K275 1.00 X = 0
Besi Polos 59.184 X = 0
Besi Ulir 112.731 X = 0
Bekisting 15.714 X = 0
Jumlah 0
Keuntungan 0
Jumlah Total 0
DIBULATKAN 0 OK
U
1 M3 BALOK 15 X 20 0.15 X 0.2 cover beton = 0.025 m

Panjang 1 : 0.15 : 0.2 = 33.3333333333333 M1

Besi dia 10 0 dia 0


Besi dia 10 4 dia 10
Begel dia 8 - 0.15 8

Besi dia 10 33.33 X 0 X 0 KG = = 0.000


Besi dia 10 33.33 X 4 X 0.617 KG = = 82.200
Begel dia 8 - ( 33.33 : 0.15 ) X ( 0.125 + 0.175 + 0.15 + 0.2 )] X 0.3946 = 56.992
139.192
Bekisting 33.33 X ( 0.15 + 0.2 + 0.15 + 0.2 ) = 23.3333333333333 m2

Beton K275 1.00 X = 0


Besi Polos 139.192 X = 0
Besi Ulir 0.000 X = 0
Bekisting 23.333 X = 0
Jumlah 0
Keuntungan 0
Jumlah Total 0
DIBULATKAN 0 OK
V
1 M3 BALOK B5A 20 X 35 0.2 X 0.35 cover beton = 0.025 m

Panjang 1 : 0.2 : 0.35 = 14.2857142857143 M1

Besi dia 16 5 dia 16


Besi dia 12 0 dia 12
Begel dia 8 - 0.1 8

Besi dia 16 14.29 X 5 X 1.578 KG = = 112.731


Besi dia 12 14.29 X 0 X 0.888 KG = = 0.000
Begel dia 8 - ( 14.29 : 0.1 ) X ( 0.175 + 0.325 + 0.2 + 0.35 )] X 0.3946 = 59.184
171.915
Bekisting 14.29 X ( 0.2 + 0.35 + 0.2 + 0.35 ) = 15.7142857142857 m2

Beton K275 1.00 X = 0


Besi Polos 59.184 X = 0
Besi Ulir 112.731 X = 0
Bekisting 15.714 X = 0
Jumlah 0
Keuntungan 0
Jumlah Total 0
DIBULATKAN 0 OK

1 M3 BALOK BD 15 X 25 0.15 X 0.25 cover beton = 0.025 m

Panjang 1 : 0.15 : 0.25 = 26.6666666666667 M1

Besi dia 13 5 dia 13


Besi dia 10 2 dia 10
Begel dia 8 - 0.15 8

Besi dia 13 26.67 X 5 X 1.042 KG = = 138.918


Besi dia 10 26.67 X 2 X 0.617 KG = = 32.880
Begel dia 8 - ( 26.67 : 0.15 ) X ( 0.125 + 0.225 + 0.15 + 0.25 )] X 0.3946 = 52.608
224.406
Bekisting 26.67 X ( 0.15 + 0.25 + 0.15 + 0.25 ) = 21.3333333333333 m2

Beton K275 1.00 X = 0


Besi Polos 85.488 X = 0
Besi Ulir 138.918 X = 0
Bekisting 21.333 X = 0
Jumlah 0
Keuntungan 0
Jumlah Total 0
DIBULATKAN 0 OK
W
1 M3 BALOK B.LIN 15 X 20 0.15 X 0.2 cover beton = 0.025 m

Panjang 1 : 0.15 : 0.2 = 33.3333333333333 M1

Besi dia 19 dia


Besi dia 12 4 dia 12
Begel dia 6 0.175 6
Besi dia 19 33.33 X 0 X 0 KG = = 0.000
Besi dia 12 33.33 X 4 X 0.888 KG = = 118.368
Begel dia 6 ( 33.33 : 0.175 ) X ( 0.125 + 0.175 + 0.15 + 0.2 )] X 0.2219 = 27.478
145.846
Bekisting 33.33 X ( 0.15 + 0.2 + 0.15 + 0.2 ) = 23.3333333333333 m2

Beton K275 1.00 X = 0


Besi ulir 0.000 X = 0
Besi polos 145.846 X = 0
Bekisting 23.333 X = 0
Jumlah 0
Keuntungan 0
Jumlah Total 0
DIBULATKAN 0 ok

X 1 M3 TIE BEAM TB1 25 X 45 0.25 X 0.45 cover beton = 0.025 m

Panjang 1 : 0.25 : 0.45 = 8.88888888888889 M1

Besi dia 13 8 dia 13


Besi dia 12 dia
Begel dia 10 0.15 10

Besi dia 13 8.89 X 8 X 1.042 KG = = 74.090


Besi dia 12 8.89 X 0 X 0 KG = = 0.000
Begel dia 10 ( 8.89 : 0.15 ) X ( 0.225 + 0.425 + 0.25 + 0.45 )] X 0.6165 = 49.320
123.410
Bekisting 8.89 X ( 0.25 + 0.45 + 0.25 + 0.45 ) = 12.4444444444444 m2
Beton K275 1.00 X = 0
Besi Polos 49.320 X = 0
Besi Ulir 74.090 X = 0
Bekisting 12.444 X = 0
Jumlah 0
Keuntungan 0
Jumlah Total 0
DIBULATKAN 0

REKTORAT
Y 1 M3 SLOOF S 25 X 50 0.25 X 0.5 cover beton = 0.025 m

Panjang 1 : 0.25 : 0.5 = 8 M1

Besi dia 16 9 dia 16


Besi dia 10 2 dia 10
Begel dia 10 0.15 10

Besi dia 16 8.00 X 9 X 1.578 KG = = 113.633


Besi dia 10 8.00 X 2 X 0.617 KG = = 9.864
Begel dia 10 ( 8.00 : 0.15 ) X ( 0.225 + 0.475 + 0.25 + 0.5 )] X 0.6165 = 47.676
171.173
Bekisting 8.00 X ( 0.25 + 0.5 + 0.25 + 0.5 ) = 12 m2

Beton K275 1.00 X = 0


Besi Polos 57.540 X = 0
Besi Ulir 113.633 X = 0
Bekisting 12.000 X = 0
Jumlah 0
Keuntungan 0
Jumlah Total 0
DIBULATKAN 0
Z 1 M3 SLOOF SL2 15 X 20 0.15 X 0.2 cover beton = 0.025 m

Panjang 1 : 0.15 : 0.2 = 33.3333333333333 M1

Besi dia 13 0 dia 13


Besi dia 12 4 dia 12
Begel dia 8 0.15 8

Besi dia 13 33.33 X 0 X 1.042 KG = = 0.000


Besi dia 12 33.33 X 4 X 0.888 KG = = 118.368
Begel dia 8 ( 33.33 : 0.15 ) X ( 0.125 + 0.175 + 0.15 + 0.2 )] X 0.3946 = 56.992
175.360
Bekisting 33.33 X ( 0.15 + 0.2 + 0.15 + 0.2 ) = 23.3333333333333 m2

Beton K275 1.00 X = 0


Besi Polos 175.360 X = 0
Besi Ulir 0.000 X = 0
Bekisting 23.333 X = 0
Jumlah 0
Keuntungan 0
Jumlah Total 0
DIBULATKAN 0

V 1 M3 PLAT LANTAI T = 10 CM 1 : 0.100 = 10 M2


1 M2
Panjang 1.00 M1 10 cm
Lebar 1.00 M1
1.000
Besi dia 10 - 150 6.667 dia 10 1m
Besi dia 10 - 150 6.667 dia 10

Besi dia 10 - 150 1.00 X 6.667 X 0.617 KG = = 4.110


Besi dia 10 - 150 1.00 X 6.667 X 0.617 KG = = 4.110
8.220
1 M3 = 82.200
Bekisting 1.00 : 0.100 = 10 m2

Beton K275 1.00 X = 0


Besi POLOS 82.200 X = 0
Bekisting 10.000 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 OK

V 1 M3 PLAT LANTAI T = 15 CM 1 : 0.150 = 6.66666666666667 M2


1 M2
Panjang 1.00 M1 10 cm
Lebar 1.00 M1
1.000
Besi dia 10 - 150 6.667 dia 10 1m
Besi dia 10 - 150 6.667 dia 10

Besi dia 10 - 150 1.00 X 6.667 X 0.617 KG = = 4.110


Besi dia 10 - 150 1.00 X 6.667 X 0.617 KG = = 4.110
8.220
1 M3 = 54.800
Bekisting 1.00 : 0.150 = 6.6666667 m2

Beton K275 1.00 X = 0


Besi POLOS 54.800 X = 0
Bekisting 6.667 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 OK

V 1 M3 PLAT LANTAI BONDEK T = 12 C 1 : 0.120 = 8.33333333333333 M2


1 M2
Panjang 1.00 M1 10 cm
Lebar 1.00 M1
1.000
Besi dia 12 - 150 6.667 dia 12 1m
Besi dia 12 - 150 6.667 dia 12

Besi dia 12 - 150 1.00 X 6.667 X 0.888 KG = = 5.918


Besi dia 12 - 150 1.00 X 6.667 X 0.888 KG = = 5.918
11.837
98.640
Bondex 1.00 : 0.120 = 8.3333333 m2
Bekisting 1.00 : 0.120 = 8.3333333 m2

Beton K275 1.00 X = 0


Besi POLOS 11.837 X = 0
Bekisting 8.333 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 OK

W 1 M3 PLAT DINDING T = 15 CM 1 : 0.15 = 6.66666666666667 M2


1 M2
Panjang 1.00 M1
Lebar 1.00 M1

Besi dia 12 - 150 6.667 dia 12


Besi dia 12 - 150 6.667 dia 12

Besi dia 12 - 150 2.00 X 6.667 X 0.888 KG = = 11.837


Besi dia 12 - 150 2.00 X 6.667 X 0.888 KG = = 5.918
17.755
1 M3 = 118.368
Bekisting 2.00 : 0.15 = 13.333333 m2

Beton K225 1.00 X = 0


Besi Polos 118.368 X = 0
Besi Ulir 0.000 X = 0
Bekisting 13.333 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0

1 M3 PLAT BORDES T = 15 CM 1 : 0.15 = 6.66666666666667 M2


1 M2
Panjang 1.00 M1
Lebar 1.00 M1
Besi dia 10 - 150 6.667 dia 10
Besi dia 10 - 150 6.667 dia 10

Besi dia 10 - 150 2.00 X 6.667 X 0.617 KG = = 8.220


Besi dia 10 - 150 2.00 X 6.667 X 0.617 KG = = 4.110
12.330
1 M3 = 82.200
Bekisting 1.00 : 0.15 = 6.6666667 m2
1 M3 PLAT TANGGA T = 17 CM 1 : 0.17 = 5.88235294117647 M2
1 M2
Panjang 1.00 M1
Lebar 1.00 M1

Besi dia 13 - 150 dia


Besi dia 13 - 150 dia 13
Besi dia 10 - 150 6.667 dia 10
Besi dia 8 - 150 6.667 dia 8

Besi dia 13 - 150 1.00 X - X 1.578 KG = = 0.000


Besi dia 13 - 150 1.00 X - X 1.042 KG = = 0.000
Besi dia 10 - 150 1.00 X 6.667 X 0.617 KG = = 4.113
Besi dia 8 - 150 1.00 X 6.667 X 0.395 KG = = 2.633
6.747
1 M3 = 39.686
Bekisting 1.00 : 0.17 = 5.8823529 m2

1 M3 PLAT KANOPI T = 8 CM 1 : 0.08 = 12.5 M2


1 LAPIS
Panjang 1.00 M1
Lebar 1.00 M1

Besi dia 8 - 150 6.667 dia 10


Besi dia 8 - 150 6.667 dia 10

Besi dia 8 - 150 1.00 X 6.667 X 0.617 KG = = 4.110


Besi dia 8 - 150 1.00 X 6.667 X 0.617 KG = = 4.110
8.220
1 M3 = 102.750
Bekisting 1.00 : 0.08 = 12.5 m3
Beton K225 1.00 X = 0
Besi Polos 102.750 X = 0
Besi Ulir 0.000 X = 0
Bekisting 12.500 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0

A1 1 M3 PONDASI P1 M 1.2 : 0.350 = 3.42857142857143 M2


KOLOM
Besi dia 16 8 dia 16 1 M3 KOLOM 30 X 30 0.3 X 0.3 cover b 0.025 m
Besi dia 10 0 dia 0 Panjan 1 : 0.3 : 0.3 = 11.11 M1
Begel dia 10 - 0.105 10 45

Besi dia 16 11.11 X 8 X 1.578 KG = = 140.288


Besi dia 10 11.11 X 0 X 0 KG = = 0.000
Begel dia 10 - ( 11.11 : 0.105 ) X ( 0.275 + 0.275 + 0.30 + 0.30 )] X 0.6165 = 75.024
215.312
Bekisting 11.11 X ( 0.3 + 0.3 + 0.3 + 0.3 ) = 13.3333333333333 m2
PLAT
Panjang 1.00 M1
Lebar 1.00 M1

Besi dia 13 - 200 6.667 dia 13 1m


Besi dia 13 - 200 6.667 dia 13

Besi dia 13 - 200 2.00 X 6.667 X 1.042 KG = = 13.892


Besi dia 13 - 200 2.00 X 6.667 X 1.042 KG = = 13.892
27.784
1 M3 = 95.258
Bekisting 1.00 : 0.350 = 2.8571429 m2

Beton K275 1.00 X = 0


Besi POLOS PLAT
Besi POLOS PEDESTAL 75.02
Besi ULIR PLAT 95.258 X = 0
Besi ULIR PEDESTAL 140.288
Bekisting PLAT 2.857 X = 0
Bekisting PEDESTAL 13.333
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 OK

A2 1 M3 PONDASI P1 1.2 : 0.350 = 3.42857142857143 M2


KOLOM
Besi dia 16 8 dia 16 1 M3 KOLOM 30 X 30 0.3 X 0.3 cover b 0.025 m
Besi dia 13 8 dia 13 Panjan 1.2 : 0.3 : 0.3 = 13.33 M1
Begel dia 10 - 0.2 10 45

Besi dia 16 13.33 X 8 X 1.578 KG = = 168.346


Besi dia 10 13.33 X 8 X 1.042 KG = = 111.134
Begel dia 10 - ( 13.33 : 0.2 ) X ( 0.275 + 0.275 + 0.30 + 0.30 )] X 0.6165 = 47.265
326.745
Bekisting 13.33 X ( 0.3 + 0.3 + 0.3 + 0.3 ) = 16 m2

PLAT
Panjang 1.00 M1
Lebar 1.00 M1
1.000
Besi dia 13 - 200 6.667 dia 13 1m
Besi dia 13 - 200 6.667 dia 13

Besi dia 13 - 200 2.00 X 6.667 X 1.042 KG = = 13.892


Besi dia 13 - 200 2.00 X 6.667 X 1.042 KG = = 13.892
27.784
1 M3 = 95.258
Bekisting 1.00 : 0.35 = 2.8571429 m2

Beton K275 1.00 X = 0


Besi POLOS 47.27
Besi ULIR 263.604 X = 0
Bekisting 18.857 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 OK
A2 1 M3 PONDASI TANGGA 1 : 0.200 = 5 M2
1 M2
Panjang 1.00 M1 10 cm
Lebar 1.00 M1
1.000
Besi dia 13 - 200 6.667 dia 13 1m
Besi dia 13 - 200 6.667 dia 13
Besi dia 13 - 200 2.00 X 6.667 X 1.042 KG = = 13.892
Besi dia 13 - 200 2.00 X 6.667 X 1.042 KG = = 13.892
27.784
1 M3 = 138.918
Bekisting 1.00 : 0.2 = 5 m2

Beton K275 1.00 X = 0


Besi ULIR 125.026 X = 0
Bekisting 5.000 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 OK

A4 1 M3 Pondasi SP18 7.2 X 4.6 1.2 cover beton = 0.03 m

Panjang 1 : 7.2 : 0.25 = 0.56 M1

Besi dia 22 54 dia 22 36


Besi dia 19 34.5 dia 19 23
Begel dia 8 - 0 8

Besi dia 22 0.56 X 54 X 2.984 KG = = 89.516


Besi dia 19 0.56 X 34.5 X 2.226 KG = = 42.657
Begel dia 8 - ( 0.56 : 0) X ( 7.17 + 4.57 + 7.20 + 4.60 )] X 0.3946 = #DIV/0!
132.172
Bekisting 0.56 X ( 7.2 + 0.25 + 4.60 + 0.25 ) = 6.833 m2
Beton K225 1.00 X = -
Besi Polos #DIV/0! X = #DIV/0!
Besi Ulir 132.172 X -
Bekisting 6.833 X = -
Jumlah #DIV/0!
Keuntungan
Jumlah Total #DIV/0!
DIBULATKAN #DIV/0!

A4 1 M3 Pondasi SP6 3.6 X 2.4 1.2 cover beton = 0.03 m

Panjang 1 : 3.6 : 0.25 = 1.11 M1

Besi dia 22 27 dia 22 18


Besi dia 19 18 dia 19 12
Begel dia 8 - 0 8

Besi dia 22 1.11 X 27 X 2.984 KG = = 89.516


Besi dia 19 1.11 X 18 X 2.226 KG = = 44.511
Begel dia 8 - ( 1.11 : 0) X ( 3.57 + 2.37 + 3.60 + 2.40 )] X 0.3946 = #DIV/0!
134.027
Bekisting 1.11 X ( 3.6 + 0.25 + 2.40 + 0.25 ) = 7.222 m2

Beton K225 1.00 X = -


Besi Polos #DIV/0! X = #DIV/0!
Besi Ulir 134.027 X -
Bekisting 7.222 X = -
Jumlah #DIV/0!
Keuntungan
Jumlah Total #DIV/0!
DIBULATKAN #DIV/0!

A4 1 M3 Pondasi SP5 3.278 X 2.4 1.2 cover beton = 0.03 m

Panjang 1 : 3.278 : 0.25 = 1.22 M1

Besi dia 22 24.585 dia 22 16.39


Besi dia 19 18 dia 19 12
Begel dia 8 - 0 8

Besi dia 22 1.22 X 24.585 X 2.984 KG = = 89.516


Besi dia 19 1.22 X 18 X 2.226 KG = = 48.884
Begel dia 8 - ( 1.22 : 0) X ( 3.248 + 2.37 + 3.28 + 2.40 )] X 0.3946 = #DIV/0!
138.399
Bekisting 1.22 X ( 3.278 + 0.25 + 2.40 + 0.25 ) = 7.539 m2

Beton K225 1.00 X = -


Besi Polos #DIV/0! X = #DIV/0!
Besi Ulir 138.399 X -
Bekisting 7.539 X = -
Jumlah #DIV/0!
Keuntungan
Jumlah Total #DIV/0!
DIBULATKAN #DIV/0!

A4 1 M3 Pondasi SP4 2.4 X 2.4 1.2 cover beton = 0.03 m

Panjang 1 : 2.4 : 0.25 = 1.67 M1

Besi dia 22 18 dia 22 12


Besi dia 19 18 dia 19 12
Begel dia 8 - 0 8

Besi dia 22 1.67 X 18 X 2.984 KG = = 89.516


Besi dia 19 1.67 X 18 X 2.226 KG = = 66.767
Begel dia 8 - ( 1.67 : 0) X ( 2.37 + 2.37 + 2.40 + 2.40 )] X 0.3946 = #DIV/0!
156.283
Bekisting 1.67 X ( 2.4 + 0.25 + 2.40 + 0.25 ) = 8.833 m2

Beton K225 1.00 X = -


Besi Polos #DIV/0! X = #DIV/0!
Besi Ulir 156.283 X -
Bekisting 8.833 X = -
Jumlah #DIV/0!
Keuntungan
Jumlah Total #DIV/0!
DIBULATKAN #DIV/0!

A4 1 M3 Pondasi SP3 2.6 X 2.2 1.2 cover beton = 0.03 m

Panjang 1 : 2.6 : 0.25 = 1.54 M1

Besi dia 22 19.5 dia 22 13


Besi dia 19 16.5 dia 19 11
Begel dia 8 - 0 8

Besi dia 22 1.54 X 19.5 X 2.984 KG = = 89.516


Besi dia 19 1.54 X 16.5 X 2.226 KG = = 56.495
Begel dia 8 - ( 1.54 : 0) X ( 2.57 + 2.17 + 2.60 + 2.20 )] X 0.3946 = #DIV/0!
146.011
Bekisting 1.54 X ( 2.6 + 0.25 + 2.20 + 0.25 ) = 8.154 m2

Beton K225 1.00 X = -


Besi Polos #DIV/0! X = #DIV/0!
Besi Ulir 146.011 X -
Bekisting 8.154 X = -
Jumlah #DIV/0!
Keuntungan
Jumlah Total #DIV/0!
DIBULATKAN #DIV/0!

A4 1 M3 Pondasi SP2 1.2 X 2.4 1.2 cover beton = 0.03 m

Panjang 1 : 1.2 : 0.25 = 3.33 M1

Besi dia 19 9 dia 19 6


Besi dia 16 18 dia 16 12
Begel dia 8 - 0 8

Besi dia 19 3.33 X 9 X 2.226 KG = = 66.767


Besi dia 16 3.33 X 18 X 1.578 KG = = 94.694
Begel dia 8 - ( 3.33 : 0) X ( 1.17 + 2.37 + 1.20 + 2.40 )] X 0.3946 = #DIV/0!
161.461
Bekisting 3.33 X ( 1.2 + 0.25 + 2.40 + 0.25 ) = 13.667 m2

Beton K225 1.00 X = -


Besi Polos #DIV/0! X = #DIV/0!
Besi Ulir 161.461 X -
Bekisting 13.667 X = -
Jumlah #DIV/0!
Keuntungan
Jumlah Total #DIV/0!
DIBULATKAN #DIV/0!

C 1 M3 KOLOM 15 X 15 (KP)
1 M3 KOLOM 15 X 15 0.15 X 0.15 cover beton = 0.025 m
Panjang 1 : 0.15 : 0.15 = 44.4444444444444 M1
45
Besi dia 10 0 dia 0
Besi dia 10 4 dia 10
Begel dia 8 - 0.2 8 45

Besi dia 10 44.44 X 0 X 0 KG = = 0.000


Besi dia 10 44.44 X 4 X 0.617 KG = = 109.600
Begel dia 8 - ( 44.44 : 0.2 ) X ( 0.125 + 0.125 + 0.15 + 0.15 )] X 0.3946 = 48.224
157.824
Bekisting 44.44 X ( 0.15 + 0.15 + 0.15 + 0.15 ) = 26.6666666666667 m2

Beton K275 1.00 X = 0


Besi Polos 157.824 X = 0
Besi Ulir 0.000 X = 0
Bekisting 26.667 X = 0
Jumlah 0
Jumlah Total 0
DIBULATKAN 0 ok