Anda di halaman 1dari 16

REKAPITULASI

RENCANA ANGGARAN BIAYA


PEMBANGUNAN GEDUNG KANTOR SAMSAT BANGKA BELITUNG
KOTA PANGKAL PINANG
TAHUN ANGGARAN 2019

SUB TOTAL TOTAL


NO URAIAN PEKERJAAN
(RP.) (RP.)
I. PEKERJAAN PERSIAPAN 153.548.154,71
II. PEKERJAAN STANDARD
A. PEKERJAAN STRUKTUR 1.826.749.804,14
C. PEKERJAAN ATAP 361.012.297,83
D. PEKERJAAN ARSITEKTUR 1.661.119.762,04
E. PEKERJAAN MEKANIKAL & SANITARY 160.592.272,00
F. PEKERJAAN ELEKTRIKAL 441.377.200,59
TOTAL PEKERJAAN STANDARD 4.450.851.336,60
III. PEKERJAAN NON STANDARD
A. BANGUNAN GENSET & RUMAH POMPA 46.496.224,53
B. PEKERJAAN PAGAR SAMPING DAN BELAKANG 323.370.462,26
C. PEK. PAGAR DEPAN, GERBANG & PAPAN NAMA 56.625.415,97
D. PEK. SARANA PARKIR ,SALURAN & TAMAN 387.342.462,70
E. PEK. ELEKTRIKAL NON STANDARD 211.014.865,30
F. PEK. MEKANIKAL NON STANDARD 60.555.400,00
TOTAL PEKERJAAN NON STANDARD 1.085.404.830,76
IV. PEKERJAAN BANGUNAN PENDUKUNG
A. PEK. PEMBUATAN POS JAGA (3 Unit) 74.853.132,53
B. PEK. PEMBANGUNAN MUSHOLA & KANTIN 318.091.504,90
C. PEK. RUANG CETAK PLAT & R.PENJAGA KANTOR 280.887.715,77
TOTAL PEKERJAAN BANGUNAN PENDUKUNG 673.832.353,20
JUMLAH TOTAL 6.363.636.675,27
PPN (10%) 636.363.667,53
JUMLAH + PPN 7.000.000.342,80
DIBULATKAN 7.000.000.000,00
Terbilang :

# TUJUH MILYAR RUPIAH #

Pangkalpinang, 23 Desember 2019


Dibuat Oleh
Konsultan Perencana
CV. Gunung Kencana

……………………..
Direktur utama
RINCIAN
RENCANA ANGGARAN BIAYA
PEMBANGUNAN GEDUNG KANTOR SAMSAT BANGKA BELITUNG
KOTA PANGKAL PINANG
TAHUN ANGGARAN 2009

HARGA TOTAL JUMLAH


NO URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA
(RP.) (RP.)
1 2 3 4 5 6=5X3
I. PEKERJAAN PERSIAPAN
1 Pek. Pengukuran kembali lokasi site 2.013,40 m2 1.000,00 2.013.400,00
2 Pek. Pembersihan Lokasi Site 2.013,40 m2 5.357,73 10.787.262,04
3 Pek. Pemasangan Pagar Sementara keliling site plan 292,93 m1 218.748,45 64.077.982,44
4 Pek. Pembuatan Kantor Direksikeet 24,00 m2 1.507.621,26 36.182.910,24
5 Pek. Pengadaan Air & Listrik kerja 1,00 Ls 2.500.000,00 2.500.000,00
6 Pek. Pembersihan sisa bekas pekerjaan 1,00 Ls 1.000.000,00 1.000.000,00
7 Biaya Perijinan ( IMB ) 1.560,00 m2 25.000,00 39.000.000,00
TOTAL PERSIAPAN 153.548.154,71
II. PEKERJAAN STANDARD
A. PEKERJAAN STRUKTUR
I. PEKERJAAN GALIAN & URUGAN
1 Pek. Pasang Papan Bouplank 98,84 m1 49.591,55 4.901.628,80
2 Pek. Galian Tanah Pondasi Plat Setempat 41,04 m3 30.635,94 1.257.222,19
3 Pek. Galian Tanah Sloof 20/30 50,82 m3 23.340,86 1.186.182,59
4 Pek. Galian Tanah Pondasi Batu kali menerus 33,88 m3 23.340,86 790.788,39
5 Pek. Urugan Pasir Bawah Pondasi Plat & Sloof t=10cm 10,54 m3 125.095,72 1.318.321,26
6 Pek. Urugan Pasir Bawah Pondasi batu kali t=10cm 2,71 m3 125.095,72 339.059,44
7 Pek. Urugan Tanah Kembali bks Galian 75,17 m3 11.184,51 840.785,24
8 Pek. Urugan Tanah Peninggian Bangunan t=40 cm(Tanah dari luar) 198,79 m3 153.235,72 30.461.373,55
9 Pek. Urugan Tanah Peninggian Bangunan (Tanah bks galian) 108,90 m3 11.184,51 1.218.041,93
JUMLAH - I 42.313.403,39
II. PEKERJAAN PONDASI, POER & SLOOF 63
1 Pek. Aanstamping Batukali 4,07 m3 585.263,45 2.379.447,09
2 Pek. Pondasi Batu kali camp. 1Pc:4Psr 10,67 m3 852.004,36 9.092.760,94
3 Pek. Lantai Kerja dibawah Pondasi plat & Sloof t=5 cm 49,02 m2 95.920,05 4.701.760,82
4 Pekerjaan Beton Pondasi Plat Type P-1 (1,00X1,00X0,40)m 0,35 m3 4.679.526,96 1.637.834,44
5 Pekerjaan Beton Pondasi Plat Type P-2 (1,25X1,25X0,40)m 4,73 m3 4.679.526,96 22.110.764,88
6 Pekerjaan Beton Pondasi Plat Type P-3 (1,50X1,50X0,40)m 17,33 m3 4.679.526,96 81.072.804,56
7 Pekerjaan Beton Pondasi Tangga (1,00X1,50X35)m 0,66 m3 4.679.526,96 3.070.939,57
8 Pekerjaan Beton Dinding Pedestal Tangga ,t=15cm 0,32 m3 6.842.619,39 2.155.425,11
9 Beton Sloof SL1 20/40 23,18 m3 5.936.714,33 137.636.785,10
10 Beton Sloof SL2 15/25 1,27 m3 4.035.423,35 5.127.005,37
JUMLAH - II 268.985.527,87

III. PEKERJAAN BETON LANTAI BAWAH


1 Pekerjaan kolom Beton K1-40/40,Beton K-225,tulangan 108,05 kg/m3 22,40 m3 6.805.306,23 152.438.859,57
2 Pekerjaan kolom Beton K2-30/30,Beton K-225,tulangan 184,19 kg/m3 1,26 m3 4.538.000,00 5.717.880,00
3 Pek Beton Kolom Praktis KP 11/11, Beton K.175,tulangan 168,57 kg/m3 182,00 m' 91.471,88 16.647.882,21
4 Pek. Beton Balok B1 30/60 cm, Elevasi +4,20,Beton K-225,tulangan 151,84 kg/m3 44,60 m3 5.552.811,01 247.677.582,14
5 Pek. Beton Balok B2 25/50 cm, Elevasi +4,20,Beton K-225,tulangan 177,78 kg/m3 12,08 m3 5.552.811,01 67.050.192,90
6 Pek. Beton Balok Bordes Tangga B4 20/30 cm, Elv. +1,80,K-225,tulangan.232,21 kg/m3 0,25 m3 5.552.811,01 1.399.308,37
7 Pek.Beton Plat Lantai t=12 cm , Elevasi +4,10, 68,74 m3 6.062.411,35 416.704.269,40
8 Pek.Beton Plat Dak t=10 cm , Elevasi +4,20,Beton K-225 4,67 m3 4.035.423,35 18.838.566,84
9 Pek Beton Plat , Step Tangga -(2 Unit) ,Beton K-225 2,61 m3 6.062.411,35 15.822.166,12
10 Pek.Beton Plat Bordes Tangga t=12 cm (2 Unit),Beton K-225 0,76 m3 6.062.411,35 4.583.182,98
11 Pek Beton Balok Lintle Kusen, Beton K.175 34,36 m' 107.211,25 3.684.100,12
12 Pek Beton Luifel Jendela t= 10 cm, Beton K.175 1,22 m3 5.514.265,78 6.753.045,58
13 Pek Beton Meja Wasstafel t=10 cm, Beton K.175 0,19 m3 5.514.265,78 1.065.356,15
JUMLAH - III 958.382.392,38
HARGA TOTAL JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA
(RP.) (RP.)
1 2 3 4 5 6=5X3

IV. PEKERJAAN BETON LANTAI ATAS


1 Pekerjaan Beton Kolom K1-40/40,Beton K-225 16,78 m3 6.805.306,23 114.214.815,53
2 Pekerjaan kolom Beton K2-30/30,Beton K-225 1,46 m3 4.538.000,00 6.611.298,75
3 Pek Kolom Praktis KP 15/15, Beton K.175 314,69 m' 91.471,88 28.784.828,65
4 Pek. Beton Balok B1 - 30/60 cm, Elevasi +8,56 9,07 m3 5.552.811,01 50.375.101,45
5 Pek. Beton Balok B3 - 20/40 cm, Elevasi +8,56 1,66 m3 5.552.811,01 9.204.339,52
6 Pek. Beton Balok BL - 10/40 cm, Elevasi +8,56 1,01 m3 5.552.811,01 5.597.233,49
7 Pek. Beton Plat Dak Atap t=10 cm,Elv. + 8,56 8,66 m3 5.514.265,78 47.758.642,33
8 Pek. Beton Balok B1 - 30/60 cm, Elevasi +9,56 2,10 m3 5.552.811,01 11.660.903,11
9 Pek. Beton Balok B2 - 25/50 cm, Elevasi +9,56 2,10 m3 5.552.811,01 11.660.903,11
10 Pek. Beton Balok B3 - 20/40 cm, Elevasi +9,56 0,67 m3 5.552.811,01 3.731.489,00
11 Pek. Beton Balok B4 - 20/30 cm, Elevasi +9,56 9,27 m3 5.552.811,01 51.494.548,15
12 Pek. Beton Balok BL - 10/40 cm, Elevasi +9,56 4,17 m3 5.552.811,01 23.135.231,78
13 Pek. Beton Plat Dak Atap t=10 cm,Elv. + 9,56 30,29 m3 5.514.265,78 167.011.946,17
14 Pekerjaan kolom Beton K2-30/30,Elv. + 9,56,Beton K-225 1,39 m3 4.538.000,00 6.289.668,00
15 Pek. Beton Balok RB1 - 15/30 cm, Elevasi +10,56 2,76 m3 5.552.811,01 15.322.426,69
16 Pek Beton Luifel Jendela t= 10 cm, Beton K.175 0,66 m3 5.514.265,78 3.612.946,94
17 Pek Beton Meja Wasstafel t=10 cm, Beton K.175 0,11 m3 5.514.265,78 602.157,82
JUMLAH - IV - 557.068.480,51
SUB TOTAL STRUKTURE 1.826.749.804,14
C. PEKERJAAN ATAP
1 Pekerjaan Kuda-kuda & Rangka atap Baja Ringan "Zinkalum" 683,13 m2 250.000,00 170.782.425,00
2 Pasang Glasswoll 683,13 m2 25.000,00 17.078.242,50
3 Pasang Aluminium Foil 683,13 m2 108.883,35 74.381.453,08
4 Penutup atap Metal roof 683,13 m2 117.155,86 80.032.647,29
5 Bubung Metal Roof 83,42 m' 116.964,14 9.756.633,97
6 Lisplang Plat GRC Lbr.30cm tebat 12 mm 112,26 m' 80.000,00 8.980.896,00
SUB TOTAL ATAP 361.012.297,83

D. PEKERJAAN ARSITEKTUR
I. PEKERJAAN DINDING & PLESTERAN
I.a LANTAI BAWAH
1 Pasangan dinding 1/2 bata 1 : 2 268,25 m2 181.941,94 48.805.380,79
2 Pekerjaan plester dan acian dinding 1 : 2 536,49 m2 37.431,32 20.081.676,10
3 Pasangan dinding 1/2 bata 1 : 5 168,37 m2 169.646,78 28.562.648,73
4 Pekerjaan plester dan acian dinding 1 : 5 336,73 m2 32.034,22 10.786.906,96
5 Pekerjaan plester dan acian Profil Tali air dinding 49,91 m1 6.500,00 324.415,00
6 Pekerjaan plester dan acian Ban-banan dinding 296,80 m1 15.000,00 4.452.000,00
7 Pekerjaan Pasang dinding Batu alam Andesit 14,15 m2 350.000,00 4.953.900,00
8 Pekerjaan dinding keramik 20X25 h= 2m 99,82 m2 199.033,57 19.867.531,00
9 Pekerjaan Border dinding keramik 10X20 49,91 m' 25.000,00 1.247.750,00
10 Pekerjaan Plin dinding Kayu L=10 cm (Partisi) 146,46 m' 103.500,00 15.159.075,75
11 Pekerjaan Railling Tangga (Depan & Belakang ) Pipa Stainlesstel 40,15 m' 750.000,00 30.108.750,00
SUB JUMLAH 184.350.034,32
II.b LANTAI ATAS
1 Pasangan dinding 1/2 bata 1 : 2 58,07 m2 181.941,94 10.564.459,01
2 Pekerjaan plester dan acian dinding 1 : 2 116,13 m2 37.431,32 4.346.898,65
3 Pasangan dinding 1/2 bata 1 : 5 562,57 m2 169.646,78 95.438.615,67
4 Pekerjaan plester dan acian dinding 1 : 5 1.125,15 m2 32.034,22 36.043.137,23
5 Pekerjaan plester dan acian Profil Tali air dinding 37,19 m1 6.500,00 241.741,50
6 Pekerjaan plester dan acian Ban-banan dinding 126,00 m1 15.000,00 1.890.000,00
7 Pekerjaan Pasang dinding Batu alam Andesit 4,48 m2 350.000,00 1.568.000,00
8 Pekerjaan dinding keramik 20X25 h= 2m 74,38 m2 199.033,57 14.804.515,03
9 Pekerjaan Border dinding keramik 10X20 37,19 m' 25.000,00 929.775,00
SUB JUMLAH 165.827.142,10
JUMLAH - I 350.177.176,42
HARGA TOTAL JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA
(RP.) (RP.)
1 2 3 4 5 6=5X3

II. PEK. KUSEN PINTU/JENDELA & PARTISI, LENGKAP ASSESORIES


II.a LANTAI BAWAH
1 Pasang Kusen+Pintu Type PD1(Pintu Utama) 2,00 Unit 14.612.300,00 29.224.600,00
2 Pasang Kusen+Pintu Type PD2 3,00 Unit 4.204.400,00 12.613.200,00
3 Pasang Kusen+Pintu Type P1 15,00 Unit 3.941.700,00 59.125.500,00
4 Pasang Kusen+Pintu Type P2 7,00 Unit 3.645.300,00 25.517.100,00
5 Pasang Kusen+Pintu Type P3 8,00 Unit 2.409.400,00 19.275.200,00
6 Pasang Kusen+jendela Type J1 20,00 Unit 2.871.600,00 57.432.000,00
7 Pasang Kusen+jendela Type J6 2,00 Unit 2.871.600,00 5.743.200,00
8 Pasang Kusen+jendela Type J7 8,00 Unit 2.871.600,00 22.972.800,00
9 Pasang Kusen+jendela Type J8 3,00 Unit 2.837.100,00 8.511.300,00
8 Pasang Kusen+jendela Type BV1 2,00 Unit 2.871.600,00 5.743.200,00
SUB JUMLAH 246.158.100,00
II.b LANTAI ATAS
1 Pasang Kusen+Pintu Type PD2 3,00 Unit 4.204.400,00 12.613.200,00
2 Pasang Kusen+Pintu Type P1 13,00 Unit 3.941.700,00 51.242.100,00
3 Pasang Kusen+Pintu Type P2 8,00 Unit 3.645.300,00 29.162.400,00
4 Pasang Kusen+Pintu Type P3 8,00 Unit 2.409.400,00 19.275.200,00
5 Pasang Kusen+jendela Type J1 20,00 Unit 2.871.600,00 57.432.000,00
6 Pasang Kusen+jendela Type J7 8,00 Unit 2.871.600,00 22.972.800,00
7 Pasang Kusen+jendela Type BV1 2,00 Unit 496.400,00 992.800,00
SUB JUMLAH 193.690.500,00
JUMLAH - II 439.848.600,00

III. PEKERJAAN PLAFOND


III.a LANTAI BAWAH
1 Pek. Plafond Gypsum 9mm+Rangka Hollow 40x40 573,00 m2 250.000,00 143.250.000,00
2 Pek. Plafond GRC 5 mm+ Rangka Hollow 40x40 (Toilet+KM) 42,98 m2 245.000,00 10.528.875,00
3 Pekerjaan profil gipsum 301,50 m' 13.000,00 3.919.500,00
4 Pekerjaan profil kayu 71,40 m' 13.500,00 963.900,00
SUB JUMLAH 157.698.375,00
III.b LANTAI ATAS
1 Pek. Plafond Gypsum 9mm+Rangka Hollow 40x40 589,50 m2 250.000,00 147.375.000,00
2 Pek. Plafond GRC 5 mm+ Rangka Hollow 40x40 (Toilet+KM) 31,50 m2 245.000,00 7.717.500,00
3 Pek. Plafond GRC 5 mm+ Rangka Hollow 40x40 (Overstek atap) 31,50 m2 245.000,00 7.717.500,00
4 Pekerjaan profil gipsum 390,00 m' 13.000,00 5.070.000,00
5 Pekerjaan profil kayu 39,00 m' 13.500,00 526.500,00
SUB JUMLAH 168.406.500,00
JUMLAH - III 326.104.875,00
HARGA TOTAL JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA
(RP.) (RP.)
1 2 3 4 5 6=5X3

IV. PEKERJAAN LANTAI


IV.a LANTAI BAWAH
1 Urugan pasir bawah lantai t=10 cm 117,16 m3 125.095,72 14.655.843,34
2 Lantai kerja t = 5 cm 3,54 m2 95.920,05 339.377,11
3 Pekerjaan lantai keramik 40X40 ( Diagonal) 183,15 m2 203.397,87 37.252.319,04
4 Pekerjaan lantai keramik 40X40 ( Border Diagonal) 8,88 m2 213.567,76 1.896.481,70
5 Pekerjaan Border Lantai List Pinggir 20X40 (Warna Coklat) 10,27 m2 213.567,76 2.192.806,96
6 Pekerjaan lantai keramik 40X40 595,24 m2 203.397,87 121.070.036,88
7 Pekerjaan lantai keramik 40X40 (Tangga) 117,37 m2 203.397,87 23.873.656,64
8 Pekerjaan Plin lantai keramik 10X40 743,10 m' 25.717,29 19.110.607,19
9 Pekerjaan lantai keramik KM 20X20 59,94 m2 185.797,87 11.136.724,05
10 Pekerjaan Step Nozing tangga 39,54 m' 25.717,29 1.016.958,20
11 Pek. Lantai Rabat t = 5 cm (Keliling Bangunan) 0,93 m2 95.920,05 89.003,31
SUB JUMLAH 232.633.814,42
IV.b LANTAI ATAS
1 Urugan pasir bawah lantai t=10 cm 70,76 m3 125.095,72 8.852.085,99
2 Pekerjaan lantai keramik 40X40 ( Diagonal) 183,15 m2 213.567,76 39.114.934,99
3 Pekerjaan Border Lantai List Pinggir 10X40 10,27 m2 213.567,76 2.192.806,96
4 Pekerjaan lantai keramik 40X40 595,24 m2 203.397,87 121.070.036,88
5 Pekerjaan Plin lantai keramik 10X40 699,86 m' 25.717,29 17.998.376,06
6 Pekerjaan lantai keramik KM 20X20 49,95 m2 185.797,87 9.280.603,37
SUB JUMLAH 198.508.844,25
JUMLAH - IV 431.142.658,66

V. PEKERJAAN FINISHING & PENGECATAN


V.a LANTAI BAWAH
1 Pekerjaan Finishing Opening Kusen pada dinding bata 665,21 m1 7.500,00 4.989.075,00
2 Pekerjaan pengecatan dinding Exterior Watershiel 215,75 m2 21.158,82 4.565.100,51
3 Pekerjaan pengecatan dinding bata & partisi (Interior) 873,22 m2 16.927,06 14.781.126,59
4 Pekerjaan pengecatan plafond 574,91 m2 16.927,06 9.731.534,75
5 Pekerjaan pengecatan politur Daun pintu Lapis Teakwood 15,54 m2 75.109,49 1.167.201,50
SUB JUMLAH SUB JUMLAH 35.234.038,36
V.b LANTAI ATAS
1 Pekerjaan Finishing Opening Kusen pada dinding bata 735,21 m1 7.500,00 5.514.075,00
2 Pekerjaan pengecatan dinding Exterior Watershiel 201,06 m2 21.158,82 4.254.213,94
3 Pekerjaan pengecatan dinding bata & partisi (Interior) 1.241,28 m2 16.927,06 21.011.133,57
4 Pekerjaan pengecatan plafond 609,00 m2 16.927,06 10.308.578,15
5 Pekerjaan pengecatan politur Daun pintu Lapis Teakwood 15,54 m2 75.109,49 1.167.201,50
6 Pekerjaan pengecatan lisplang kayu 34,67 m2 32.397,14 1.123.173,08
SUB JUMLAH 43.378.375,24
JUMLAH - V 113.846.451,96
SUB TOTAL ARSITEKTURE 1.661.119.762,04
E. PEKERJAAN MEKANIKAL & SANITARY
I PEKERJAAN INSTALASI AIR BERSIH
1. LANTAI - 1
a. PIPA AIR BERSIH (PPR PN 16)
- PPR dia 1/2 inc 177,60 m 66.102,69 11.739.837,26
- PPR dia 3/4 inc 92,50 m 81.816,69 7.568.043,57
- PPR dia 1 inc 37,00 m 119.562,69 4.423.819,43
b. Valve (Class 125 psi)
- Gate valve dia 3/4 inc 1,00 unit 100.000,00 100.000,00
- Gate valve dia 1 inc 2,00 unit 160.000,00 320.000,00
SUB JUMLAH 24.151.700,26
2. LANTAI - 2
a. PIPA AIR BERSIH (PPR PN 16)
- PPR dia 1/2 inc 83,25 m 66.102,69 5.503.048,72
- PPR dia 3/4 inc 37,00 m 81.816,69 3.027.217,43
- PPR dia 1 inc 9,25 m 119.562,69 1.105.954,86
b. Valve (Class 125 psi)
- Gate valve dia 3/4 inc 1,00 unit 100.000,00 100.000,00
- Gate valve dia 1 inc 2,00 unit 160.000,00 320.000,00
SUB JUMLAH 10.056.221,00
JUMLAH - I 34.207.921,26
HARGA TOTAL JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA
(RP.) (RP.)
1 2 3 4 5 6=5X3
II. PEKERJAAN INSTALASI AIR KOTOR
1. LANTAI - 1
c. PIPA AIR KOTOR (PVC Class 10 kg/cm2)
- PVC dia 2 inc 74,00 m 43.007,42 3.182.549,01
- PVC dia 3 inc 55,50 m 118.335,89 6.567.641,94
- PVC dia 4 inc 194,25 m 150.432,91 29.221.592,22
- PVC dia 6 inc 37,00 m 176.979,89 6.548.255,96
SUB JUMLAH 45.520.039,14
2. LANTAI - 2
c. PIPA AIR KOTOR (PVC Class 10 kg/cm2)
- PVC dia 2 inc 66,60 m 43.007,42 2.864.294,11
- PVC dia 3 inc 18,50 m 118.335,89 2.189.213,98
- PVC dia 4 inc 74,00 m 150.432,91 11.132.035,13
SUB JUMLAH 16.185.543,22
JUMLAH - II 61.705.582,36
III. PEKERJAAN SANITARY
a. LANTAI BAWAH
1 Floor drained "TOTO" 9,00 bh 58.159,90 523.439,08
2 Kran air 1/2" 10,00 bh 49.469,82 494.698,23
3 Closet Duduk "TOTO" 6,00 bh 2.433.810,52 14.602.863,14
4 Urinoir U57M "TOTO" 3,00 bh 1.228.523,07 3.685.569,20
5 Sekat Urinoir Porselin "TOTO" 3,00 bh 350.000,00 1.050.000,00
6 Washtafel Bulat + Accecories "TOTO" 4,00 bh 729.228,09 2.916.912,37
SUB JUMLAH 23.273.482,02
b. LANTAI ATAS
1 Floor drained "TOTO" 16,00 bh 58.159,90 930.558,36
2 Kran air 1/2" 10,00 bh 49.469,82 494.698,23
3 Closet Duduk "TOTO" 9,00 unit 2.433.810,52 21.904.294,72
4 Urinoir U57M "TOTO" 6,00 bh 1.228.523,07 7.371.138,40
5 Sekat Urinoir Porselin "TOTO" 6,00 bh 350.000,00 2.100.000,00
6 Washtafel Bulat + Accecories "TOTO" 7,00 unit 729.228,09 5.104.596,64
7 Bak. Kitchen zing lengkap meja beton+keramik 1,00 unit 3.500.000,00 3.500.000,00
SUB JUMLAH 41.405.286,36
JUMLAH - III 64.678.768,38
SUB TOTAL PEK.MEKANIKAL STANDARD & SANITARY 160.592.272,00
F. PEKERJAAN ELEKTRIKAL
I. ELEKTRIKAL LANTAI DASAR
1. PEMASANGAN PANEL
a PP-D/LP-D
- Panel box (800x600x250) mm 1,00 bh 2.750.000,00 2.750.000,00
- Busbar+Wiring Material 1,00 lot 1.950.000,00 1.950.000,00
Input
- MCCB 3P 32 A 1,00 bh 325.000,00 325.000,00
- Pilot Lamp Tlmq+MCB 1P 2A 3,00 set 80.500,00 241.500,00
Output
- MCB 1P 6A 12,00 bh 70.000,00 840.000,00
- MCB 1P 16A 6,00 bh 70.000,00 420.000,00
- MCB 3P 6A 1,00 bh 285.000,00 285.000,00
b SDP
- Panel box (800x600x250) mm 1,00 bh 2.750.000,00 2.750.000,00
- Busbar+Wiring Material 1,00 lot 1.950.000,00 1.950.000,00
Input
- MCB 3P 80 A 1,00 bh 825.000,00 825.000,00
- Pilot Lamp Tlmq+MCB 1P 2A 3,00 set 80.500,00 241.500,00
Output
- MCB 3P 32A 4,00 bh 325.000,00 1.300.000,00
SUB JUMLAH 13.878.000,00
2 PASANG KABEL TRAY
kabel tray elektrikal (300 x 50) mm 38,00 m 222.000,00 8.436.000,00
kabel ladder elektrikal (300 x 100) mm 5,00 m 218.000,00 1.090.000,00
SUB JUMLAH 9.526.000,00
3 PASANG GROUNDING SYSTEM
Grounding system max. 2 Ohm + Box Control 1,00 titik 2.950.000,00 2.950.000,00
SUB JUMLAH 2.950.000,00
HARGA TOTAL JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA
(RP.) (RP.)
1 2 3 4 5 6=5X3
4 PEMASANGAN INSTALASI PENERANGAN/LAMPU
1 Installasi
RM TL 2x36 W 41,00 titik 196.260,22 8.046.669,02
Down Light 14 W 23,00 titik 196.260,22 4.513.985,06
Down Light 18 W 35,00 titik 196.260,22 6.869.107,70
Baret Lamp 20 W 9,00 titik 196.260,22 1.766.341,98
stop kontak 25,00 titik 225.699,25 5.642.481,33
2 Material
RM TL 2x36 W 41,00 bh 422.600,00 17.326.600,00
Down Light 14 W 23,00 bh 350.000,00 8.050.000,00
Down Light 18 W 35,00 bh 315.000,00 11.025.000,00
Baret Lamp 20 W 9,00 bh 375.000,00 3.375.000,00
Stop kontak 25,00 bh 24.100,00 602.500,00
Saklar ganda 19,00 bh 24.100,00 457.900,00
Saklar tunggal 21,00 bh 18.100,00 380.100,00
SUB JUMLAH 68.055.685,09
JUMLAH - I 94.409.685,09
II. ELEKTRIKAL LANTAI ATAS
1 PEMASANGAN PANEL
a PP-ATAS/LP-ATAS
- Panel box (800x600x250) mm 1,00 bh 2.750.000,00 2.750.000,00
- Busbar+Wiring Material 1,00 lot 1.950.000,00 1.950.000,00
Input
- MCCB 3P 32 A 1,00 bh 325.000,00 325.000,00
- Pilot Lamp Tlmq+MCB 1P 2A 3,00 set 80.500,00 241.500,00
Output -
- MCB 1P 6A 11,00 bh 70.000,00 770.000,00
- MCB 1P 16A 6,00 bh 70.000,00 420.000,00
- MCB 3P 6A 1,00 bh 285.000,00 285.000,00
SUB JUMLAH 252.688.555,26
5 PASANG KABEL TRAY
kabel tray elektrikal (300 x 50) mm 38,00 m 222.000,00 8.436.000,00
kabel ladder elektrikal (300 x 100) mm 5,00 m 218.000,00 1.090.000,00
SUB JUMLAH 9.526.000,00
7 PEMASANGAN INSTALASI PENERANGAN/LAMPU LT.ATAS
1 Installasi
RM TL 2x36 W 41,00 titik 196.260,22 8.046.669,02
Down Light 14 W 15,00 titik 196.260,22 2.943.903,30
Down Light 18 W 21,00 titik 196.260,22 4.121.464,62
Baret Lamp 20 W 9,00 titik 196.260,22 1.766.341,98
stop kontak 25,00 titik 225.699,25 5.642.481,33
2 Material
RM TL 2x36 W 41,00 bh 422.600,00 17.326.600,00
Down Light 14 W 15,00 bh 350.000,00 5.250.000,00
Down Light 18 W 21,00 bh 315.000,00 6.615.000,00
Baret Lamp 20 W 9,00 bh 375.000,00 3.375.000,00
Stop kontak 25,00 bh 24.100,00 602.500,00
Saklar ganda 19,00 bh 24.100,00 457.900,00
Saklar tunggal 21,00 bh 18.100,00 380.100,00
SUB JUMLAH 56.527.960,25
JUMLAH - II 318.742.515,50
III. PENANGKAL PETIR
Cable BC 50 mm2 225,00 m 65.000,00 14.625.000,00
Road Protection 4,00 bh 200.000,00 800.000,00
Installasi & accessories 4,00 titik 250.000,00 1.000.000,00
Grounding system max. 2 Ohm + Box Control 4,00 titik 2.950.000,00 11.800.000,00
JUMLAH - III 28.225.000,00
SUB TOTAL PEK. ELEKTRIKAL STANDARD 441.377.200,59
TOTAL JUMLAH PEKERJAAN GEDUNG 4.450.851.336,60
HARGA TOTAL JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA
(RP.) (RP.)
1 2 3 4 5 6=5X3

III. PEKERJAAN NON STANDARD


A. BANGUNAN GENSET & RUMAH POMPA
I. PEKERJAAN PERSIAPAN
1 Pek. Pengukuran dan Pek.Bouwplank 26,70 m1 49.591,55 1.324.094,39
Sub Jumlah I 1.324.094,39
II. PEKERJAAN TANAH
1 Pek.Galian Tanah Pondasi Menerus 3,56 m3 23.340,86 83.093,47
2 Pek.Urugan Tanah ( Tanah dari Luar ) 12,71 m3 30.250,00 384.453,30
3 Pek.Pasir Urug Bawah Pondasi t = 5 cm 0,82 m3 36.850,00 30.172,78
Sub Jumlah II 497.719,55
III. PEKERJAAN PASANGAN
1 Pek. Pas. Aanstamping 2,28 m3 585.263,45 1.333.464,25
2 Pek. Pas. Pondasi Batu Kali 1 : 4 5,13 m3 852.004,36 4.367.715,16
3 Pas. Pondasi Rollag Bata 4,65 m3 252.300,00 1.174.380,81
4 Pas. Pondasi Dudukan Genset 0,28 m3 3.377.810,00 962.000,29
5 Pas. Pasir Urug 26,00 m3 36.850,00 957.985,77
6 Pas. Lantai Kerja t = 3 cm 26,00 m3 223.640,00 5.813.946,72
7 Pas. Beton Rabat 1 : 3 : 5 16,73 m3 447.280,00 7.483.888,96
8 Pek. Slab Beton t= 10cm 1,13 m3 1.948.630,00 2.202.536,49
9 Pek. Sloof 15/20; 4D16 0,43 m3 3.342.580,00 1.427.950,18
10 Pas. Bata merah 1/2 Batu 1Pc : 5Ps 34,94 m2 53.380,00 1.865.171,93
11 Pek. Kolom 15/15 0,32 m3 4.326.860,00 1.386.325,94
12 Pek. Balok 15/20 0,16 m3 3.677.160,00 589.081,03
13 Pek. Plat beton t=10cm 2,57 m3 2.556.990,00 6.576.833,98
14 Pek. Listplang beton t=5cm; f 8 - 15 0,38 m3 2.556.990,00 978.560,07
15 Pas. Plesteran dan Acian 1Pc : 5Ps (Plat Dak) 25,73 m2 28.250,00 726.869,68
16 Pas. Waterproofing Plat Dak 25,73 m2 13.060,00 336.032,49
17 Pas. Plesteran dan Acian 1Pc : 5Ps 105,63 m2 20.770,00 2.194.020,26
Sub Jumlah III 40.376.764,00
IV. PEKERJAAN BESI
1 Pintu Plat besi 1/8" rangka besi siku50x50x5, kusen UNP 6,5 0,89 m2 615.636,50 547.916,49
2 Talang avoor pipa besi galvanis dia. 4" medium B 16,02 m1 28.380,00 454.647,60
3 Pek.pas. Kunci gembok 1,00 bh 20.000,00 20.000,00
Sub Jumlah IV 1.022.564,09
V. PEKERJAAN LAIN-LAIN
1 Pengecatan Tembok termasuk beton expose 101,95 m2 13.060,00 1.331.528,51
2 Pas. Titik Lampu 2,00 Ttk 195.000,00 390.000,00
3 Pas. Titik Kontak 1,00 Ttk 224.250,00 224.250,00
4 Pas. Armatur 1 x 25 Watt 1,00 bh 75.000,00 75.000,00
5 Pas. Lampu Pilot 1,00 bh 80.000,00 80.000,00
6 Pas. Saklar Ganda 1,00 bh 20.000,00 20.000,00
7 Pas. Exhaus Fan 1,00 Unit 250.000,00 250.000,00
8 BC 50 qmm 28,00 m1 25.000,00 700.000,00
9 Earthing Rood 16 x 2.500 mm 3,00 m1 25.000,00 75.000,00
10 Klem aerthing rood 3,00 bh 5.000,00 15.000,00
11 Pipa PVC 3" AW1 0,80 m1 17.880,00 14.304,00
12 Pembersihan Kembali Areal Kerja 1,00 Ls 100.000,00 100.000,00
Sub Jumlah V 3.275.082,51
Jumlah ( I + II + III + IV + V ) 46.496.224,53
B. PEKERJAAN PAGAR SAMPING DAN BELAKANG 249,93 M1
I. PEKERJAAN GALIAN & URUGAN
1 Pekerjaan Pasang papan Bouwplank 99,97 m' 49.591,55 4.957.766,44
2 Pek. Galian Tanah 199,94 m³ 23.340,86 4.666.865,23
3 Pek. Urugan Pasir 19,99 m³ 125.095,72 2.501.213,89
4 Pek. Buangan Tanah Eks Galian 43,40 m³ 29.956,92 1.300.130,22
SUB JUMLAH 13.425.975,78
II. PEKERJAAN PONDASI & BETON
1 Pek. Aanstamping Batu Kali 29,99 m³ 585.263,45 17.552.987,37
2 Pek. Pasangan Batu Kali 1 : 4 (Sekaligus Dinding Saluran Jalan) 83,10 m³ 852.004,36 70.803.032,09
3 Pekerjaan Beton Sloof 15/20 7,50 m³ 4.035.423,35 30.257.200,75
4 Pekerjaan beton Kolom Praktis 15/15 210,78 m' 91.471,88 19.279.985,57
5 Pekerjaan Beton Balok Lintle 15/20 249,93 m' 107.211,25 26.795.307,21
SUB JUMLAH 164.688.513,00
III. PEKERJAAN DINDING & FINISHING
1 Pek. Pasangan Bata 1 : 5 499,86 m² 169.646,78 84.799.641,70
2 Pek. Plester dan Acian 1 : 5 (Dinding & Kolom) 499,86 m² 32.034,22 16.012.622,88
3 Pek. Plester dan Acian Kamprotan (bagian belakang) 499,86 m² 21.500,00 10.746.990,00
HARGA TOTAL JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA
(RP.) (RP.)
1 2 3 4 5 6=5X3
4 Pek.Pasang besi siku L.50x50x5 (dudukan Kawat duri) 538,90 Kg 18.052,11 9.728.282,32
5 Pek. Pasang Kawat duri 5 baris kawat 2.140,60 m' 4.100,00 8.776.460,00
6 Pek. Pengecatan Dinding 856,24 m² 16.927,06 14.493.623,90
7 Pek. Pengecatan besi siku 21,56 m² 32.397,14 698.352,67
SUB JUMLAH 145.255.973,48
SUB TOTAL - C 323.370.462,26
C. PEK. PAGAR DEPAN, GERBANG & PAPAN NAMA 43,00 M1
I. PEKERJAAN GALIAN & URUGAN
1 Pekerjaan Pasang Bouwplank 17,20 m' 49.591,55 852.974,66
2 Pek. Galian Tanah 34,40 m³ 23.340,86 802.925,64
3 Pek. Urugan Pasir 3,44 m³ 125.095,72 430.329,28
4 Pek. Urugan Tanah Kembali 7,69 m³ 11.184,51 85.986,55
5 Pek. Buangan Tanah Eks Galian 37,91 m³ 29.956,92 1.135.726,66
SUB JUMLAH 3.307.942,78
II. PEKERJAAN PONDASI & BETON
1 Pek. Aanstamping Batu Kali 5,16 m³ 585.263,45 3.019.959,42
2 Pek. Pasangan Batu Kali 1 : 4 (Sekaligus Dinding Saluran Jalan) 14,30 m³ 852.004,36 12.181.532,35
3 Pek. Sloof Beton 15/20 1,29 m³ 4.035.423,35 5.205.696,12
4 Pek. Kolom Praktis 15/15 38,33 m' 91.471,88 3.506.422,08
5 Pek. Balok 15/20 43,00 m' 107.211,25 4.610.083,66
SUB JUMLAH 28.523.693,63
III. PEKERJAAN DINDING & FINISHING
1 Pek. Pasangan Bata (Dinding Pagar+Bungkus Kolom 15/15) 71,92 m² 70.000,00 5.034.512,00
2 Pek. Plester dan Acian (Dinding & Kolom) 143,84 m² 24.700,00 3.552.927,04
3 Pek. Plester dan Acian Profilan Kolom 129,60 m' 6.500,00 842.400,00
4 Pek. Pengecatan Dinding 143,84 m² 28.600,00 4.113.915,52
5 Pek.Pasang Dinding Keramik Granit 40x40 Polis "Indogress" 5,25 m2 238.100,00 1.250.025,00
6 Pek. Pintu Gerbang (Besi Hollow 40x40&20x40) lengkap 2,00 Unit 5.000.000,00 10.000.000,00
SUB JUMLAH 24.793.779,56
SUB TOTAL - C 56.625.415,97
D. PEK. SARANA PARKIR ,SALURAN & TAMAN
I. PEKERJAAN SALURAN & JEMBATAN
1 Pekerjaan Drainase Gravel U20cm+Pas Bata (Keliling Bangunan) 276,00 m' 160.500,00 44.298.000,00
2 Pekerjaan Drainase Gravel U20cm+Pas Bata (Saluran Kiri/Kanan/Belakang) 135,00 m' 160.500,00 21.667.500,00
3 Pekerjaan Drainase Tertutup Buist beton dia.30cm 81,00 m' 134.800,00 10.918.800,00
4 Pekerjaan Grill Tutup Saluran 94,80 m' 350.000,00 33.180.000,00
SUB JUMLAH 110.064.300,00
HARGA TOTAL JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA
(RP.) (RP.)
1 2 3 4 5 6=5X3
II. PEKERJAAN JALAN & PEDESTRIAN
1 Pekerjaan Pembenrukan Badan Jalan 1.037,64 m3 21.000,00 21.790.503,00
2 Pekerjaan Lapisan Pondasi Bawah (LPB) t= 20 cm 1.037,64 m2 48.900,00 50.740.742,70
3 Pekerjaan Lapisan Pondasi Atas (LPA) t= 10 cm 1.037,64 m2 21.900,00 22.724.381,70
4 Pekerjaan Lapisan Penetrasi (Lapen) t=5 cm 1.037,64 m2 27.300,00 28.327.653,90
5 Pekerjaan Lapisan Hotmix (AS-WC) t=5 cm 1.037,64 m2 101.800,00 105.632.057,40
6 Pekerjaan Pedestrian Paving Block 6 cm Natural 70,38 m2 85.400,00 6.010.452,00
7 Pekerjaan Kansteen 399,19 m' 58.800,00 23.472.372,00
SUB JUMLAH 258.698.162,70
III. PEKERJAAN TIANG BENDERA & TAMAN
1 Pasang Tiang Bendera lengkap pondasi & Accessories 1,00 Ls 2.500.000,00 2.500.000,00
2 Pekerjaan Taman
- Urugan Tanah Subur 20 cm 46,65 m3 75.000,00 3.498.750,00
- Tanaman Rumput Gajah 233,25 m2 25.000,00 5.831.250,00
- Tanaman Pohon Soka 50,00 Tnmn 2.500,00 125.000,00
- Tanaman Pohon Palm Botol 6,00 Tnmn 65.000,00 390.000,00
- Tanaman Pohon Waru 21,00 Tnmn 35.000,00 735.000,00
- Tanaman Bougenvil 20,00 Tnmn 50.000,00 1.000.000,00
- Tanaman Pohon Bambu kecil 300,00 Tnmn 15.000,00 4.500.000,00
SUB JUMLAH 18.580.000,00
SUB TOTAL - D 387.342.462,70
E. PEK. ELEKTRIKAL NON STANDARD
I. PENYAMBUNGAN DAYA PLN
1 Beaya penyambungan (BP) dan Uang jaminan 1,00 Ls 65.430.465,30 65.430.465,30
langganan (UJL) untuk 42 kVA, beserta semua beaya
yang diperlukan untuk perijinan penyambungan daya
JUMLAH - I 65.430.465,30
II. PEKERJAAN PANEL AC
1 Panel PP-AC1
• Panel box (H) 600 x (W) 500 x (D) 400 mm 1,00 Bh 550.000,00 550.000,00
• MCCB in 3P, 100AF/63AT, 25kA 1,00 Bh 649.500,00 649.500,00
• MCB out 3P, 20A, 10 kA 9,00 Bh 300.000,00 2.700.000,00
• Pilot light 220 VAC c/w neon bulb & fuse 3,00 Bh 35.000,00 105.000,00
• Bare copper, 100A 1,00 set 550.000,00 550.000,00
• Instalasi 1,00 Ls 800.000,00 800.000,00
• Peralatan dan material bantu 1,00 Ls 800.000,00 800.000,00
Sub Jumlah 6.154.500,00
2 Panel PP-AC2
• Panel box (H) 600 x (W) 500 x (D) 400 mm 1,00 Bh 550.000,00 550.000,00
• MCCB in 3P, 100AF/63AT, 25kA 1,00 Bh 649.500,00 649.500,00
• MCB out 3P, 20A, 10 kA 9,00 Bh 300.000,00 2.700.000,00
• Pilot light 220 VAC c/w neon bulb & fuse 3,00 Bh 35.000,00 105.000,00
• Bare copper, 100A 1,00 set 550.000,00 550.000,00
• Instalasi 1,00 Ls 800.000,00 800.000,00
• Peralatan dan material bantu 1,00 Ls 800.000,00 800.000,00
Sub Jumlah 6.154.500,00
3 Panel PP-AB
• Panel box (H) 600 x (W) 500 x (D) 400 mm 1,00 Bh 550.000,00 550.000,00
• MCB in 3P, 25A, 10kA 1,00 Bh 622.000,00 622.000,00
• MCB out 3P, 10A, 10 kA 1,00 Bh 300.000,00 300.000,00
• MCB out 1P, 6A/10A, 6 kA 3,00 Bh 74.000,00 222.000,00
• Direct On Line (DOL) starter 1,00 Bh 520.500,00 520.500,00
• Pilot light 220 VAC c/w neon bulb & fuse 3,00 Bh 35.000,00 105.000,00
• Bare copper, 100A 1,00 set 550.000,00 550.000,00
• Instalasi 1,00 Ls 800.000,00 800.000,00
• Peralatan dan material bantu 1,00 Ls 800.000,00 800.000,00
Sub Jumlah 4.469.500,00
JUMLAH - II 16.778.500,00
HARGA TOTAL JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA
(RP.) (RP.)
1 2 3 4 5 6=5X3
III. KABEL DAYA UTAMA
Pengadaan dan pemasangan Kabel daya listrik, galian, pelindung sesuai gambar, urugan kembali.
beserta terminasi dan kelengkapan lainnya.
Dari kWh meter PLN ke MDP
- NYY 4 x 50 mm² 21,00 M¹ 160.000,00 3.360.000,00
Dari MDP ke :
- LP-OL, NYY 4 x 4 mm² 17,00 M¹ 14.800,00 251.600,00
- LP-A, NYY 4 x 6 mm² + NYA 6 mm2 4,00 M¹ 26.900,00 107.600,00
- LP-B, NYY 4 x 6 mm² + NYA 6 mm2 8,00 M¹ 26.900,00 215.200,00
- PP-AB, NYY 4 x 4 mm² 28,00 M¹ 14.800,00 414.400,00
- PP-AC1, NYY 4 x 10 mm² + NYA 6 mm2 14,00 M¹ 37.500,00 525.000,00
- PP-AC2, NYY 4 x 10 mm² + NYA 6 mm2 21,00 M¹ 37.500,00 787.500,00
JUMLAH - III 5.661.300,00
IV. PENERANGAN LUAR DAN GARDU
Lampu Jalan HPIT 125W, tiang 9 meter, lengan 3 mtere, pondasi 4,00 bh 2.250.000,00 9.000.000,00
terminal box.
Lampu Sorot HPI-T 125 W, dan dudukan 1,00 bh 750.000,00 750.000,00
Lampu Taman HPLN 80W, tiang GIP, pondasi 13,00 bh 340.000,00 4.420.000,00
terminal box.
Instalasi peneragan luar, NYFGbY 3x4mm2, dalam pipa 18,00 bh 360.000,00 6.480.000,00
PVC Hi 20mm2, ditaman di tanah, dan kelengkapannya
galian tanah dan urugan kembali
Fitting E27, Lampu PL 14 W 4,00 bh 31.600,00 126.400,00
Instalasi lampu, NYY 3x2,5mm2, dalam pipa konduit 4,00 bh 180.000,00 720.000,00
PVC Hi 20mm2, inbow dos, dan kelengkapannya
Saklar ganda 2,00 bh 24.100,00 48.200,00
Outlet daya dinding dng instalasi NYM 3x2,5mm2 4,00 bh 210.000,00 840.000,00
dalam pipa conduit PVC Hi. dia.20mm
JUMLAH - IV 22.384.600,00
V. SISTEM TELEPON
Pengadaan dan pemasangan sistim telepon lengkap PABX, outlet
telepon, Hand set, sistim instalasi dan kelengkapan lainnya.
1 Peralatan Utama
a. PABX Kapasitas 30 extention, 6 incoming, 1,00 unit 50.000.000,00 50.000.000,00
power supply dan batery back-up
c. Main Distribution Frame, 40 pair in, 40 pair out. 1,00 unit 565.000,00 565.000,00
d. Sambungan line incoming TELKOM 4,00 line 750.000,00 3.000.000,00
Sub Jumlah 53.565.000,00
2 Kabel dari MDF / PABX ke Terminal Box
Pengadaan dan pemasangan kabel telepon tanah, termasuk peralatan bantu,
kabel ties, pelindung kabel, penggalian jalur kabel, bobokan tembok dan perapihan kembali.
a TBT-A, Kabel Telepon Indoor, 20 pair, 0,6mm 4,00 m 72.500,00 290.000,00
b TBT-B, Kabel Telepon Indoor, 20 pair, 0,6mm 12,00 m 72.500,00 870.000,00
Sub Jumlah 1.160.000,00
3 Instalasi telepon Lantai Satu
a. Terminal box TBT-A, Kapasitas 20 pair. 1,00 unit 350.000,00 350.000,00
b. Outlet telepon dinding, dan instalasi dari TBT-A ke 13,00 ttk 150.000,00 1.950.000,00
outlet dinding, dng kabel telepon indoor,
RVV 2 x 0,6mm, dalam pipa PVC Hi. 20mm.
Sub Jumlah 2.300.000,00
4 Instalasi telepon Lantai Atas
a. Terminal box TBT-B, Kapasitas 20 pair. 1,00 unit 350.000,00 350.000,00
b. Outlet telepon dinding, dan instalasi dari TBT-B ke 12,00 ttk 150.000,00 1.800.000,00
outlet dinding, dng kabel telepon indoor,
RVV 2 x 0,6mm, dalam pipa PVC Hi. 20mm.
Sub Jumlah 2.150.000,00
JUMLAH - V 59.175.000,00
HARGA TOTAL JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA
(RP.) (RP.)
1 2 3 4 5 6=5X3
VI. INSTALASI JARINGAN DATA KOMPUTER
1 HUB 16 Kanal 1,00 bh 2.750.000,00 2.750.000,00
2 HUB 24 Kanal 1,00 bh 4.100.000,00 4.100.000,00
3 Kabel data UTP Cat. 5 dalam pipa PVC HI. Dia. 20mm 19,00 ttk 150.000,00 2.850.000,00
4 Outlet Data Komputer, dinding dng inbow dos, 19,00 bh 95.000,00 1.805.000,00
meja dengan outbow dos.
5 Kabel STP dari HUB ke Server, dlm pipa PVC 32,00 m 165.000,00 5.280.000,00
JUMLAH - VII 16.785.000,00
VII. SISTEM TATA SUARA
1 Mixer Pre Amplfier 4 input 1,00 bh 3.250.000,00 3.250.000,00
2 Power Amplifier 60 Watt RMS 1,00 bh 4.500.000,00 4.500.000,00
3 Dynamic Microphone dng desk stand 1,00 bh 275.000,00 275.000,00
4 Hand Microphone 1,00 bh 175.000,00 175.000,00
5 Speaker kolom 10 Watt 6,00 bh 950.000,00 5.700.000,00
6 Instalasi Speaker dng kabel NYMHY 2x2,5mm2 dlm 6,00 ttk 150.000,00 900.000,00
pipa konduit PVC 20mm
7 Conference system untuk ruang rapat 1,00 set 10.000.000,00 10.000.000,00
kap. 10 delegates, perkabelan dan power supllay
JUMLAH -VIII 24.800.000,00
SUB TOTAL - ELEKTRIKAL NON STANDARD 211.014.865,30
F. PEK. MEKANIKAL NON STANDARD
I. TANGKI AIR DAN PEMIPAAN AIR BERSIH
1 Tangki air fiber bulat, kapasitas 1 m3, lengkap dengan 2,00 unit 1.500.000,00 3.000.000,00
dudukan penyangga di atas plat dak.
2 Pemipaan tangki air, header, gate valve, foating valve
dan drain beserta kelengkapannya sesuai gambar
• Gate valve ø 25 mm 2,00 Bh 100.000,00 200.000,00
• Gate valve ø 32 mm 2,00 Bh 150.000,00 300.000,00
• Gate valve ø 40 mm 4,00 Bh 200.000,00 800.000,00
• Gate valve ø 50 mm 2,00 Bh 250.000,00 500.000,00
• Header GIP ø 75 mm 1,00 Bh 600.000,00 600.000,00
• Floating Valve ø 40 mm 2,00 Bh 450.000,00 900.000,00
3 Pemipaan air bersih utama
Pengadaan dan pemasangan pipa distribusi air bersih, GIP Medium A,
Pipa dicat warna biru.Lengkap dengan fitting dan asesories yang diperlukan
Pipa utama dari Tangki atas sampai toilet
• GIP ø 40 mm dari meter air PDAM ke reservoir 42,00 m 168.600,00 7.081.200,00
• GIP ø 32 mm dari reservoir ke roof tank 22,00 m 111.500,00 2.453.000,00
• GIP ø 25 mm dari roof tank ke toilet 32,00 m 97.800,00 3.129.600,00
JUMLAH - I 18.963.800,00
HARGA TOTAL JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA
(RP.) (RP.)
1 2 3 4 5 6=5X3
II. RESERVOIR, SEPTIC TANK, RESAPAN DAN PEMIPAAN KE DRAINASE
• Septic tank kapasitas 5 m3 2,00 unit 6.071.900,00 12.143.800,00
• Bak Kontrol, 0.6mx0,6m, sesuai gambar 2,00 unit 450.000,00 900.000,00
• PVC AW ø 75 mm 112,00 m 30.900,00 3.460.800,00
• PVC AW ø 100 mm 122,00 m 51.900,00 6.331.800,00
JUMLAH - II 22.836.400,00
III. PENGKONDISIAN UDARA (AC)
Pemipaan refrigerant dari indoor ke outdoor
Pipa Liquid dan Gas, ukuran sesuai rekomendasi pabrik, pipa tembaga kualitas tinggi, Type L atau jenis oxidized
phosphorous seamless copper pipe, merk Crane Enfiled atau setara. Lengkap dng aseories yang diperlukan, sesuai
spesifikasi teknis. isolasi pipa refrigerant bagian gas (gas side) dengan thermaflex, bagian liquid tidak diisolasi.
1 Indoor unit Lt. 2 ke Outdoor unit masing-masing 140,00 m 53.000,00 7.420.000,00
2 Indoor unit Lt. 1 ke Outdoor unit masing-masing 180,00 m 53.000,00 9.540.000,00
Pemipaan pengembunan (drain) indoor
Pipa PVC AW, lengkap penggantung sesuai spesifikasi teknis, U-trap, sambungan solvent cemnet, konektor, slope 1%
Isolasi pipa pengembunan (termasuk pipa dalam dinding), dengan flexible closed cell elastomeric insulation
merk Amstrong (armaflex) atau setara.
Ukuran pipa minimal dia. 20 mm, atau sesuai rekomendasi pabrik.
3 Pipa PVC AW ø 20 mm, dng isolasi 176,00 m 8.400,00 1.478.400,00
4 Pipa PVC AW ø 25 mm, dng isolasi 32,00 m 9.900,00 316.800,00
JUMLAH - III 18.755.200,00
SUB TOTAL - MEKANIKAL NON STANDARD 60.555.400,00
TOTAL JUMLAH NON STANDARD 1.085.404.830,76
IV. PEKERJAAN BANGUNAN PENDUKUNG
A. PEK. PEMBUATAN POS JAGA (3 Unit) 3,00
I. PEKERJAAN GALIAN
1 Pek. Pasang Papan Bouwplang 48,00 m1 49.591,55 2.380.394,40
2 Galian tanah pondasi batu kali 15,36 m3 23.340,86 358.515,63
3 Urugan pasir urug t=10 cm 1,92 m3 125.095,72 240.183,79
SUB JUMLAH 2.979.093,82
II. PEKERJAAN PONDASI & BETON 8,00
1 Pekerjaan aanstamping batu kosong 2,88 m3 195.400,00 562.752,00
2 Pek. Pondasi Batu kali camp. 1Pc : 4Psr 8,10 m3 440.200,00 3.565.620,00
3 Urugan tanah ex galian pondasi 2,46 m3 8.000,00 19.680,00
4 Beton Sloof 15/20 0,72 m3 3.346.900,00 2.409.768,00
5 Beton Kolom 15/15 38,40 m1 91.471,88 3.512.520,20
6 Beton Balok Dak 15/20 24,00 m1 107.211,25 2.573.069,95
SUB JUMLAH 12.643.410,16
III. PEKERJAAN DINDING & PLESTERAN
1 Pasangan dinding bata 1 : 5 51,84 m2 65.400,00 3.390.336,00
2 Pekerjaan plester dan acian dinding 1 : 5 103,68 m2 22.600,00 2.343.168,00
3 Pekerjaan dinding keramik 20/25 h= 1,5m 7,05 m2 119.600,00 843.180,00
4 Pekerjaan plester dan acian ban 1 : 2 19,40 m1 32.500,00 630.500,00
SUB JUMLAH 7.207.184,00
IV. PEKERJAAN KUSEN PINTU.JENDELA & ASESORIES
1 Pasang Pintu Type-P1 3,00 Unit 2.504.000,00 7.512.000,00
2 Jendela Type - J1 6,00 Unit 1.500.000,00 9.000.000,00
SUB JUMLAH 16.512.000,00
V. PEKERJAAN ATAP & PLAFOND
1 Pek. Kuda-kuda rangka baja ringan 36,75 m2 250.000,00 9.187.500,00
2 Pek. Penutup Atap Matal 36,75 m2 117.155,86 4.305.477,84
3 Pek. Pasdang Nok Genteng Metal 18,00 m1 116.964,14 2.105.354,53
4 Lisplang Plat GRC Lbr.30cm tebat 12 mm 48,00 m1 80.000,00 3.840.000,00
5 Pek. Pasang Plafong Gypsum rangka Hollow 12,00 m2 250.000,00 3.000.000,00
6 Pek. Pasang Plafong GRC rangka Hollow 12,00 m2 245.000,00 2.940.000,00
7 Pek. Pasang List Plafong 96,00 m1 13.000,00 1.248.000,00
SUB JUMLAH 26.626.332,38
HARGA TOTAL JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA
(RP.) (RP.)
1 2 3 4 5 6=5X3
VI. PEKERJAAN LANTAI , FINISHING & PENGECATAN
1 Urugan pasir bawah lantai t=10 cm 0,53 m3 125.095,72 65.675,25
2 Lantai kerja t = 5 cm 12,00 m2 95.920,05 1.151.040,54
3 Pekerjaan lantai keramik 30x30 16,00 m2 192.797,87 3.084.765,85
4 Pekerjaan Pengecatan Dinding 96,63 m2 16.927,06 1.635.661,59
5 Pekerjaan Pengecatan Plafond 24,00 m2 16.927,06 406.249,39
6 Lantai Rabat t = 5 cm 4,00 m3 95.920,05 383.680,18
7 Saluran Gravel U 20 cm 4,00 m1 160.500,00 642.000,00
SUB JUMLAH 7.369.072,80
VII. PEKERJAAN INSTALASI LISTRIK
1 Titik cahaya 3,00 titik 196.260,22 588.780,66
2 Titik stop kontak 1 fasa 3,00 titik 215.886,24 647.658,73
3 Stop Kontak 3,00 bh 24.100,00 72.300,00
4 Saklar Ganda 3,00 bh 24.100,00 72.300,00
5 Pasang Lampu SL 25 watt 3,00 bh 45.000,00 135.000,00
SUB JUMLAH 1.516.039,39
SUB TOTAL - A 74.853.132,53
B. PEK. PEMBANGUNAN MUSHOLA & KANTIN 78,25
I. PEKERJAAN GALIAN
1 Pek. Pasang Papan Bouwplang 27,00 m1 49.591,55 1.338.971,85
2 Galian tanah pondasi batu kali 32,88 m3 23.340,86 767.447,53
3 Urugan pasir urug t=10 cm 2,63 m3 125.095,72 329.051,79
SUB JUMLAH 2.435.471,17
II. PEKERJAAN PONDASI & BETON
1 Pekerjaan aanstamping batu kosong 5,26 m3 585.263,45 3.078.953,97
2 Pek. Pondasi Batu kali camp. 1Pc : 4Psr 11,84 m3 852.004,36 10.085.005,22
3 Urugan tanah ex galian pondasi 23,24 m3 11.184,51 259.874,43
4 Beton Sloof 15/20 1,32 m3 3.346.900,00 4.401.842,88
5 Beton Kolom 15/15 1,37 m3 6.164.000,00 8.460.090,00
6 Beton Balok Dak 15/20 1,60 m3 4.849.300,00 7.774.397,76
7 Beton Balok Dak 20/40 0,96 m3 6.386.000,00 6.130.560,00
7 Beton Plat Dak Atap t=10cm.Beton K-225 11,20 m3 4.639.200,00 51.959.040,00
SUB JUMLAH 92.149.764,26
III. PEKERJAAN DINDING & PLESTERAN
1 Pasangan dinding bata 1 : 4 129,96 m2 169.646,78 22.047.635,41
2 Pekerjaan plester dan acian dinding 1 : 4 259,92 m2 32.034,22 8.326.461,39
3 Pekerjaan dinding keramik 20/25 h= 1,5m 30,78 m2 199.033,57 6.126.253,30
4 Pekerjaan List Dinding Keramik 10x20 20,52 m1 25.000,00 513.000,00
SUB JUMLAH 37.013.350,09
IV. PEKERJAAN ATAP & PLAFOND
1 Pek. Rangka Atap Baja Ringan 64,00 m2 250.000,00 16.000.000,00
2 Pek. Pasang Penutup Atap genteng Metal 64,00 m2 117.155,86 7.497.975,02
3 Pek. Pasang Nok Bubung genteng Metal 45,60 m2 116.964,14 5.333.564,81
4 Pekerjaan Pasang papan Listplang 3/20,kayu kamper 12,80 m2 80.000,00 1.024.000,00
5 Pekerjaan Plafond Gypsum 9mm + rangka Hollow 40x40mm 28,80 m2 250.000,00 7.200.000,00
6 Pekerjaan Plafond GRC 5mm + rangka Hollow 40x40mm (Overstek atap) 22,40 m2 245.000,00 5.488.000,00
6 Pekerjaan Pasang List Plafond Gypsum 19,20 m2 13.000,00 249.600,00
7 Pekerjaan Pasang List Plafond Kayu (Overstek atap) 44,80 m2 13.500,00 604.800,00
SUB JUMLAH 43.397.939,83
HARGA TOTAL JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA
(RP.) (RP.)
1 2 3 4 5 6=5X3
V. PEKERJAAN KUSEN PINTU.JENDELA & ASESORIES
1 Pasang Pintu Type-P1 1,00 Unit 3.467.800,00 3.467.800,00
2 Pasang Pintu Type-P2 2,00 Unit 3.944.900,00 7.889.800,00
3 Pasang Pintu Type-P3 2,00 Unit 7.041.900,00 14.083.800,00
4 Pasang Pintu Type-P4 5,00 Unit 2.417.900,00 12.089.500,00
5 Pasang Pintu Type-P5 (PVC) 5,00 Unit 463.200,00 2.316.000,00
6 Pasang Pintu Type-PJ1 4,00 Unit 7.004.900,00 28.019.600,00
7 Pasang Jendela Type - J1 4,00 Unit 4.373.600,00 17.494.400,00
8 Pasang Jendela Type - BV-1 1,00 Unit 1.287.900,00 1.287.900,00
9 Pasang Jendela Type - BV-2 2,00 Unit 2.093.100,00 4.186.200,00
SUB JUMLAH 90.835.000,00
VI. PEKERJAAN LANTAI , FINISHING & PENGECATAN
1 Urugan pasir bawah lantai t=10 cm 10,08 m3 125.095,72 1.260.964,87
2 Lantai kerja t = 5 cm 5,04 m3 95.920,05 483.437,03
3 Pekerjaan lantai keramik 40/40 91,20 m2 93.800,00 8.554.560,00
4 Pekerjaan lantai keramik KM 20/20 9,60 m2 88.800,00 852.480,00
5 Pekerjaan Finishing Dak Beton Expose 112,00 m2 32.500,00 3.640.000,00
6 Pekerjaan Pengecatan Dinding 259,92 m2 26.000,00 6.758.024,00
7 Pekerjaan Pengecatan Plafond Beton expose 112,00 m2 28.600,00 3.203.200,00
8 Waterproofing Dak ( Emulsion) 112,00 m2 29.400,00 3.292.800,00
9 Lantai Rabat t = 5 cm 2,00 m2 95.920,05 191.840,09
10 Saluran Gravel U 20 cm 40,00 m1 160.500,00 6.420.000,00
SUB JUMLAH 34.657.305,99
VII. PEKERJAAN INSTALASI LISTRIK
1 Titik cahaya 18,00 titik 185.000,00 3.330.000,00
2 Titik stop kontak 1 fasa 6,00 titik 210.000,00 1.260.000,00
3 Stop Kontak 6,00 bh 24.100,00 144.600,00
4 Saklar Tunggal 2,00 bh 18.100,00 36.200,00
5 Saklar Ganda 8,00 bh 24.100,00 192.800,00
6 Pasang Lampu DVD RMI 2x36watt 10,00 bh 422.600,00 4.226.000,00
7 Pasang Lampu Type BL 1x18watt 6,00 bh 365.000,00 2.190.000,00
8 Pasang Lampu SL 25 watt 2,00 bh 31.600,00 63.200,00
SUB JUMLAH 11.442.800,00
VIII. PEKERJAAN SANITARY & INSTALASI AIR
1 Floor drain 3,00 Unit 58.159,90 174.479,69
2 Kran air 1/2" 9,00 Unit 49.469,82 445.228,41
3 Closet Jongkok 2,00 Unit 407.632,73 815.265,46
4 Instalasi Pipa Air Bersih PVC dia 1/2" 15,00 m' 7.400,00 111.000,00
5 Instalasi Pipa Air Bersih PVC dia 3/4" 25,00 m' 8.400,00 210.000,00
6 Instalasi Pipa Air Kotor PVC dia 4" 8,00 m' 51.900,00 415.200,00
7 Instalasi Pipa Air Kotor PVC dia 3" 6,00 m' 30.900,00 185.400,00
8 Septiktank uk. Kecil berikur rembesan 1,00 Unit 3.803.300,00 3.803.300,00
SUB JUMLAH 6.159.873,56
SUB TOTAL - B 318.091.504,90
C. PEK. RUANG CETAK PLAT & R.PENJAGA KANTOR
I. PEKERJAAN GALIAN
1 Pek. Pasang Papan Bouwplang 60,00 m1 33.100,00 1.986.000,00
2 Galian tanah pondasi batu kali 68,00 m3 16.800,00 1.142.400,00
3 Urugan pasir urug t=10 cm 5,44 m3 113.400,00 616.896,00
SUB JUMLAH 3.745.296,00
II. PEKERJAAN PONDASI & BETON
1 Pekerjaan aanstamping batu kosong 7,20 m3 195.400,00 1.406.880,00
2 Pek. Pondasi Batu kali camp. 1Pc : 4Psr 16,20 m3 440.200,00 7.131.240,00
3 Urugan tanah ex galian pondasi 39,16 m3 8.000,00 313.280,00
4 Beton Sloof 15/20 2,46 m3 3.346.900,00 8.233.374,00
5 Beton Kolom 15/15 1,58 m3 6.164.000,00 9.708.300,00
6 Beton Ring Balok 15/20 3,96 m3 4.849.300,00 19.203.228,00
SUB JUMLAH 45.996.302,00
HARGA TOTAL JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA
(RP.) (RP.)
1 2 3 4 5 6=5X3
III. PEKERJAAN DINDING & PLESTERAN
1 Pasangan dinding bata 1 : 4 138,19 m2 63.200,00 8.733.355,20
2 Pekerjaan plester dan acian dinding 1 : 4 276,37 m2 23.400,00 6.467.104,80
3 Pekerjaan dinding keramik 20/25 h= 1,5m 13,80 m2 119.600,00 1.650.480,00
4 Pekerjaan List Dinding Keramik 10x20 9,20 m1 15.000,00 138.000,00
SUB JUMLAH 16.988.940,00
IV. PEKERJAAN ATAP & PLAFOND
1 Pek. Rangka Atap Baja Ringan 188,09 m2 250.000,00 47.023.500,00
2 Pek. Pasang Penutup Atap genteng Metal 188,09 m2 117.155,86 22.036.314,27
3 Pek. Pasang Nok Bubung genteng Metal 59,00 m2 116.964,14 6.900.884,30
4 Pekerjaan Pasang papan Listplang 3/20,kayu kamper 64,04 m2 80.000,00 5.123.200,00
5 Pekerjaan Plafond Gypsum 9mm + rangka Hollow 40x40mm 60,00 m2 250.000,00 15.000.000,00
6 Pekerjaan Plafond GRC 5mm + rangka Hollow 40x40mm (Overstek atap) 106,00 m2 245.000,00 25.970.000,00
6 Pekerjaan Pasang List Plafond Gypsum 62,00 m2 13.000,00 806.000,00
7 Pekerjaan Pasang List Plafond Kayu (Overstek atap) 180,00 m2 13.500,00 2.430.000,00
SUB JUMLAH 125.289.898,57
V. PEKERJAAN KUSEN PINTU.JENDELA & ASESORIES
1 Pasang Pintu Type-P1 1,00 Unit 2.504.000,00 2.504.000,00
2 Pasang Pintu Type-PJ1 3,00 Unit 3.925.900,00 11.777.700,00
3 Pasang Pintu Type-P2 (PVC) 1,00 Unit 463.200,00 463.200,00
4 Pasang Jendela Type - J1 7,00 Unit 3.585.700,00 25.099.900,00
5 Pasang Jendela Type - BV-1 1,00 Unit 1.393.200,00 1.393.200,00
SUB JUMLAH 41.238.000,00
VI. PEKERJAAN LANTAI , FINISHING & PENGECATAN
1 Urugan pasir bawah lantai t=10 cm 10,80 m3 113.400,00 1.224.720,00
2 Lantai kerja t = 5 cm 5,40 m3 521.500,00 2.816.100,00
3 Pekerjaan lantai keramik 30/30 96,00 m2 88.800,00 8.524.800,00
4 Pekerjaan lantai keramik KM 20/20 6,00 m2 88.800,00 532.800,00
5 Pekerjaan Pengecatan Dinding 262,57 m2 28.600,00 7.509.559,20
6 Pekerjaan Pengecatan Plafond 166,00 m2 27.200,00 4.515.200,00
7 Lantai Rabat t = 5 cm 2,60 m3 521.500,00 1.355.900,00
8 Saluran Gravel U 20 cm 56,00 m1 160.500,00 8.988.000,00
SUB JUMLAH 35.467.079,20
VII. PEKERJAAN INSTALASI LISTRIK
1 Titik cahaya 7,00 titik 185.000,00 1.295.000,00
2 Titik stop kontak 1 fasa 5,00 titik 210.000,00 1.050.000,00
3 Stop Kontak 5,00 bh 24.100,00 120.500,00
4 Saklar Tunggal 1,00 bh 18.100,00 18.100,00
5 Saklar Ganda 4,00 bh 24.100,00 96.400,00
6 Pasang Lampu DVD RMI 2x36watt 4,00 bh 422.600,00 1.690.400,00
7 Pasang Lampu Type BL 1x18watt 2,00 bh 365.000,00 730.000,00
8 Pasang Lampu SL 25 watt 1,00 bh 31.600,00 31.600,00
SUB JUMLAH 5.032.000,00
VIII. PEKERJAAN SANITARY & INSTALASI AIR
1 Floor drain 1,00 Unit 70.600,00 70.600,00
2 Kran air 1/2" 1,00 Unit 45.000,00 45.000,00
3 Bak mandi fibber (lengkap penguras) 1,00 Unit 426.400,00 426.400,00
4 Closet Duduk 1,00 Unit 2.024.300,00 2.024.300,00
5 Instalasi Pipa Air Bersih PVC dia 1/2" 8,00 m' 7.400,00 59.200,00
6 Instalasi Pipa Air Bersih PVC dia 3/4" 12,00 m' 8.400,00 100.800,00
7 Instalasi Pipa Air Kotor PVC dia 4" 8,00 m' 51.900,00 415.200,00
8 Instalasi Pipa Air Kotor PVC dia 3" 6,00 m' 30.900,00 185.400,00
9 Septiktank uk. Kecil berikur rembesan 1,00 Unit 3.803.300,00 3.803.300,00
SUB JUMLAH 7.130.200,00
SUB TOTAL - C 280.887.715,77
TOTAL JUMLAH PEK.BANGUNAN PENDUKUNG 673.832.353,20

Anda mungkin juga menyukai