REKAPITULASI

PEKERJAAN PEMBANGUNAN RUMAH SAKIT REGIONAL


KELAS C KABUPATEN BONE - TAHAP LANJUTAN
TAHUN ANGGARAN 2023

NO. URAIAN PEKERJAAN HARGA JUMLAH HARGA

I. PEKERJAAN PERSIAPAN Rp 99,097,920.00

II. PEKERJAAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK) Rp 82,765,000.00

III. BANGUNAN GEDUNG A Rp 1,137,030,197.65


A. PEKERJAAN ARSITEKTUR Rp 176,921,537.65
B. PEKERJAAN MEKANIKAL & ELEKTRIKAL Rp 960,108,660.00

IV. BANGUNAN GEDUNG B Rp 4,260,001,223.66


A. PEKERJAAN ARSITEKTUR Rp 2,466,165,023.66
B. PEKERJAAN MEKANIKAL & ELEKTRIKAL Rp 1,793,836,200.00

V. BANGUNAN GEDUNG C Rp 1,391,219,271.26


A. PEKERJAAN ARSITEKTUR Rp 1,078,008,771.26
B. PEKERJAAN MEKANIKAL & ELEKTRIKAL Rp 313,210,500.00

VI. BANGUNAN GEDUNG G (BINA MENTAL) Rp 2,139,643,188.22


A. PEKERJAAN STRUKTUR Rp 919,358,959.74
B. PEKERJAAN ARSITEKTUR Rp 1,042,237,858.48
C. PEKERJAAN MEKANIKAL & ELEKTRIKAL Rp 178,046,370.00

VII. BANGUNAN GEDUNG H (ASRAMA 2) Rp 2,861,211,305.78


A. PEKERJAAN STRUKTUR Rp 960,191,404.04
B. PEKERJAAN ARSITEKTUR Rp 1,350,786,314.60
C. PEKERJAAN MEKANIKAL & ELEKTRIKAL Rp 550,233,587.14

VIII. BANGUNAN M (SELASAR PENGHUBUNG 2 LANTAI & RAMP) Rp 2,072,766,240.38


A. PEKERJAAN STRUKTUR Rp 1,686,737,938.29
B. PEKERJAAN ARSITEKTUR Rp 386,028,302.10

IX. BANGUNAN M (SELASAR PENGHUBUNG 1 LANTAI) Rp 2,925,841,672.28


A. PEKERJAAN STRUKTUR Rp 2,191,943,687.33
B. PEKERJAAN ARSITEKTUR Rp 733,897,984.95

X. PEKERJAAN INTERIOR Rp 494,202,960.99

XI. PEKERJAAN SITE DEVELOPMENT Rp 5,766,000,397.93

XII. PEKERJAAN SITE UTILITAS Rp 3,573,212,379.11

JUMLAH PEKERJAAN Rp 26,802,991,757.26

PPN 11 % Rp 2,948,329,093.30
TOTAL = (JUMLAH + PPN 11%) Rp 29,751,320,850.56
DIBULATKAN Rp 29,751,320,000.00
TERBILANG :
DUA PULUH SEMBILAN MILYAR TUJUH RATUS LIMA PULUH SATU JUTA TIGA RATUS DUA PULUH RIBU
RUPIAH.

Pangkalan Bun, 30 Januari 2023

PT GRIYA FORTUNA BUUN

H.WIDOD

REKAPITULASI
REKAPITULASI
PEKERJAAN PEMBANGUNAN RUMAH SAKIT REGIONAL
KELAS C KABUPATEN BONE - TAHAP LANJUTAN
PEKERJAAN PERSIAPAN
TAHUN ANGGARAN 2023

HARGA SATUAN JUMLAH HARGA


NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)
1. 2. 3. 4. 5. 6 = (4. X 5.)

I. PEKERJAAN PERSIAPAN
1 Listrik Kerja
a. Sewa Genset 250 kVA 1 buah, termasuk instalasi dan BBM bln 6.00 7,500,000.00 45,000,000.00
b. Kabel Kerja NYY 2x2,5 mm eterna roll 2.00 975,000.00 1,950,000.00
2 Pembuatan 1 m2 Kantor Sementara/Rumah Jaga/Gudang Semen dan Peralatan Lantai
m2 Plesteran,48.00
Dinding Setengah 1,086,415.00
Tembok 52,147,920.00
JUMLAH I.PEKERJAAN PERSIAPAN 99,097,920.00

Pek. Persiapan - page 3 of 208


BOQ
PEKERJAAN PEMBANGUNAN RUMAH SAKIT REGIONAL
KELAS C KABUPATEN BONE - TAHAP LANJUTAN
SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI
TAHUN ANGGARAN 2023

HARGA SATUAN JUMLAH HARGA


NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)
1. 2. 3. 4. 5. 6 = (4. X 5.)

I. PEKERJAAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK)


A. Penyiapan RKK : set 1.00 3,500,000.00 3,500,000.00
1 Pembuatan dokumen rencana keselamatan kerja
2 Pembuatan prosedur dan instruksi kerja
3 Pengisian formulir
B. Sosialiasasi, promosi dan pelatihan :
1 Pelatihan K3 :
- P3K org 1.00 350,000.00 350,000.00
- Bekerja di ketinggian org 1.00 500,000.00 500,000.00
- Simulasi K3 org 5.00 350,000.00 1,750,000.00
- Spanduk (Banner) Lb 2.00 450,000.00 900,000.00
- Poster Lb 2.00 150,000.00 300,000.00
- Papan Informasi K3 Bh 1.00 650,000.00 650,000.00
C. Alat Pelindung Kerja dan Alat Pelindung Diri : -
1 APK antara lain : -
- Tali Keselamatan (Life Line) ls 1.00 500,000.00 500,000.00
- Penahan Jatuh (Safety Deck) ls - -
- Pembatas Area (Restricted Area) ls 1.00 500,000.00 500,000.00
- Rambu informasi bh 2.00 350,000.00 700,000.00
- Jalur evakuasi (Escape Route) ls 1.00 500,000.00 500,000.00
2 APD antara lain : -
- Topi pelindung (Safety Helmet) bh 30.00 125,000.00 3,750,000.00
- Pelindung Mata (Googles, Spectacles) Psg 2.00 65,000.00 130,000.00
- Tameng Muka (Face shield) bh 1.00 75,000.00 75,000.00
- Pelindung pernapasan dan mulut (Masker) box 2.00 35,000.00 70,000.00
- Sarung Tangan (Safety Gloves) Psg 60.00 80,000.00 4,800,000.00
- Sepatu Keselamatan (Safety boot) Psg 2.00 120,000.00 240,000.00
- Sepatu Keselamatan (Safety Shoes) Psg 2.00 250,000.00 500,000.00
- Penunjang Seluruh Tubuh (Full Body Harmess) Bh 1.00 500,000.00 500,000.00
- Rompi Keselamatan (Safety Vest) Bh 30.00 65,000.00 1,950,000.00
3 Pengadaan Sarana Pencegahan Covid 19 : -
- Handsanitizer 5 liter bh 2.00 250,000.00 500,000.00
- Cairan Disinfektan 5 liter bh 2.00 300,000.00 600,000.00
- Sabun Cuci Tangan 5 liter bh 2.00 50,000.00 100,000.00
- Termogun (Alat Pengukur Suhu Badan) bh 1.00 150,000.00 150,000.00
- Wastafel gantung + kran lengkap dengan aksesoris bh 1.00 350,000.00 350,000.00
- Alat Semprot Disinfektan bh 1.00 300,000.00 300,000.00
D. Asuransi dan Perizinan -
1 Asuransi tenaga kerja ls 1.00 7,500,000.00 7,500,000.00
2 Surat pengesahan organisasi K3 menjadi tanggung jawab pelaksana -
(P2K3, sesuai dengan ketentuan peraturan perundang-undangan) -
E. Personel K3 Konstruksi -
1 Ahli K3 1 orang bulan 6.00 4,500,000.00 27,000,000.00
2 Petugas pengatur lalu lintas (Flagman) 1 orang bulan 6.00 3,500,000.00 21,000,000.00
F. Fasilitas, sarana dan prasarana kesehatan : -
1 Peralatan P3K Lengkap (Kotak P3K, Tandu, Obat Luka, Perban, dll) ls 1.00 350,000.00 350,000.00
G. Rambu-Rambu yang diperlukan : -
1 Rambu petunjuk bh 2.00 75,000.00 150,000.00
2 Rambu larangan bh 2.00 75,000.00 150,000.00
3 Rambu informasi bh 2.00 75,000.00 150,000.00
4 Rambu pekerjaan sementara bh 2.00 75,000.00 150,000.00
5 Jalur evakuasi (escape route) ls 1.00 350,000.00 350,000.00
6 Tongkat pengatur lalu lintas (warning lights sticks) bh 1.00 150,000.00 150,000.00
H. Konsultasi dengan Ahli terkait Keselamatan Konstruksi : -
1 Ahli Struktur OJ - -
I. Lain-Lain Terkait Pengendalian Risiko Keselamatan Konstruksi : -
1 Alat pemadam api ringan (APAR) bh 2.00 450,000.00 900,000.00
2 Bendera K3 bh 1.00 250,000.00 250,000.00
3 Program Inspeksi dan Audit Internal ls 1.00 500,000.00 500,000.00

JUMLAH I.PEKERJAAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK) Rp 82,765,000.00

Pekerjaan Sistem Manajemen Keselamatan Konstruksi - page 4 of 208


RINCIAN RENCANA ANGGARAN BIAYA
PEKERJAAN PEMBANGUNAN RUMAH SAKIT REGIONAL
KELAS C KABUPATEN BONE - TAHAP LANJUTAN
BANGUNAN GEDUNG A
TAHUN ANGGARAN 2023

HARGA SATUAN JUMLAH HARGA


NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)
1. 2. 3. 4. 5. 6 = (4. X 5.)
PEKERJAAN NON STANDAR

I. PEKERJAAN ARSITEK
1.1. PEKERJAAN PELAPIS DINDING DAN PELAPIS LANTAI
A. LANTAI GROUND FLOOR
1 Bumper guard Aluminium Extrude profil (Cover Vinyl Handrail, Endcap Section) m' 269.23 528,467.50 142,279,305.03
2 Hospital curtain & Rail (Medical Track), komplit set - Kain Type Polyester m' 29.77 1,163,662.50 34,642,232.63
JUMLAH 1.1.PEKERJAAN PELAPIS DINDING DAN PELAPIS LANTAI 176,921,537.65

Pek. Non Standar Gedung A - page 5 of 208


BOQ
PEKERJAAN PEMBANGUNAN RUMAH SAKIT REGIONAL
KELAS C KABUPATEN BONE - TAHAP LANJUTAN
BANGUNAN GEDUNG A
TAHUN ANGGARAN 2023

HARGA SATUAN JUMLAH HARGA


NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)
1. 2. 3. 4. 5. 6 = (4. X 5.)

PEKERJAAN NON STANDAR


I. PEKERJAAN TRANSPORTASI VERTIKAL DALAM GEDUNG
PNEUMATIC TUBE SYSTEM (SISTEM TRANSPORTASI TABUNG )

1. TRANSFER ROOM, MAIN CONTROL & CABLES


a. Central Control Unit Dual Line System and Power Supply Unit, set 1.00 87,456,000.00 87,456,000.00
b. Blower incl. assesories set 1.00 326,818,000.00 326,818,000.00
Blower 3-Phase 2 unit
Blower Connecting Set 2 set
Blower Mounting Buffer 4 bh
Blower Sound Absorber 2 bh
Blower Controller 2 bh
Air/Transfer Diverter 4 unit
Bypass 2 bh
Hose Clamp 50-70 8 bh
Air Hose 2m
Air Lid 2 bh
Air Bow 10 bh
Reduction Air Diverter 4 bh
Connecting Tube 2 bh
Transfer Bend 14 bh
c. PC-Monitoring and Programming System RFID, 2-Line System set 1.00 22,079,000.00 22,079,000.00

2. Lantai Ground Floor


Station & Diverter & Accessories
a. 3 - Way Diverter unit 4.00 40,006,000.00 160,024,000.00
b. Multi Lab Station (2 fully automatic sending dispatchs and 1 receiving dispatch) unit 2.00 77,362,000.00 154,724,000.00
All Stations incl.: Basket, Cushion and Carrier Rack

Tube & Line System


a. Tubes PVC - Diam. 110 MM RAL 7000 m¹ 84.00 457,000.00 38,388,000.00
b. Tubes PVC - Diam. 110 MM Transparent m¹ 3.00 7,321,000.00 21,963,000.00
c. Bend R=800, RAL 7001, Grey bh 19.00 1,800,000.00 34,200,000.00
d. Bend R=800, RAL 7001, Transparent bh 2.00 5,100,000.00 10,200,000.00
e. Sleeve bh 109.00 150,000.00 16,350,000.00
f. Cable 2x2x0,22 + 3x2.5F m¹ 233.00 210,000.00 48,930,000.00

Carriers & Accessories


a. Long Carrier w/ 2xChips bh 2.00 3,900,000.00 7,800,000.00
b. Short Carrier w/ 2xChips bh 8.00 3,300,000.00 26,400,000.00

4. Testing & Commisioning ls 1.00 4,776,660.00 4,776,660.00

JUMLAH I.PEKERJAAN TRANSPORTASI VERTIKAL DALAM GEDUNG 960,108,660.00

Pek. Non Standar MEP Gedung A - page 6 of 208


RINCIAN RENCANA ANGGARAN BIAYA
PEKERJAAN PEMBANGUNAN RUMAH SAKIT REGIONAL
KELAS C KABUPATEN BONE - TAHAP LANJUTAN
BANGUNAN GEDUNG B
TAHUN ANGGARAN 2023

HARGA SATUAN JUMLAH HARGA


NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)
1. 2. 3. 4. 5. 6 = (4. X 5.)
PEKERJAAN NON STANDAR

I. PEKERJAAN ARSITEK
1.1. PEKERJAAN PELAPIS DINDING DAN PELAPIS LANTAI
A. LANTAI GROUND FLOOR
1 Bumper guard Aluminium Extrude profil (Cover Vinyl Handrail, Endcap Section) m' 428.27 528,467.50 226,326,776.23
4 Hospital curtain & Rail (Medical Track), komplit set - Kain Type Polyester m' 9.29 1,163,662.50 10,810,424.63

B. LANTAI SATU
1 Bumper guard Aluminium Extrude profil (Cover Vinyl Handrail, Endcap Section) m' 306.53 528,467.50 161,991,142.78

JUMLAH 1.1.PEKERJAAN PELAPIS DINDING DAN PELAPIS LANTAI 399,128,343.63

1.2. PEKERJAAN MODULAR OPERATING THEATRE (Terpasang By Vendor)


A. LANTAI SATU
- RUANG OK. 1
1 Base Dumper : SS-304 1200 mm x 200 mm x 1.2 mm m2 24.00 501,193.00 12,028,632.00
2 Lighting Standard : 3x16 W LED ~ 32W.220 V TL c/w COVER : ACRYLIC unit 1.00 28,730,000.00 28,730,000.00
3 Flooring : Vinyl, Scretch Resistance Anti Static 3.0 mm x 2 m x 20 m m2 36.20 1,286,811.90 46,582,590.78
4 Capping Aluminium Set 24.00 76,661.00 1,839,864.00
5 Cove Aluminium Set 24.00 93,691.00 2,248,584.00
6 PIR INTERIOR PANEL (Color 0.45 mm BMT + SS304 2B) T. 5CM - Dinding m2 70.00 3,097,952.00 216,856,640.00
7 PIR INTERIOR PANEL (Color 0.45 mm BMT + SS304 2B) T. 5CM - Plafond m2 37.20 3,039,080.00 113,053,776.00
8 Wall Glass Printing Tempered 10mm + Aksessories m2 15.00 5,663,709.15 84,955,637.25
9 X-Ray viemer : 2 Films + Auto/Manual + LED + Dimmer Set 1.00 50,277,500.00 50,277,500.00
10 Instrument Cabinet : Glass Door Set 1.00 61,520,875.00 61,520,875.00
11 Information Panel : W/RECORDING TABLE 1194 x 126 x 20 Set 1.00 20,791,264.00 20,791,264.00
12 Operation Timer : Analog 1 Digital x 2 Set 1.00 30,588,610.00 30,588,610.00
13 In used Lamp : LED ~ c/w COVER : ACRYLIC Set 1.00 3,867,500.00 3,867,500.00
14 Manual hinged single swing door (hermatic) Set 1.00 235,500,000.00 235,500,000.00
15 Automatic sliding door (Hermatic) Set 1.00 273,000,000.00 273,000,000.00
16 Passbox Magnetik System Inaterlock UV 1 X 18 WATT dan TL SS304 HL 1,2 MM (60 X 45 X 60) bh 1.00 64,918,750.00 64,918,750.00
17 Srub Up Sink, Sensor system activated tapware 3 Spout, (2400 x 600 x 1600 mm) bh 1.00 349,110,944.00 349,110,944.00
18 Electric Driven - Swing Dual Arm Surgery & ICU Pendant bh 1.00 471,165,513.00 471,165,513.00
JUMLAH 1.2.PEKERJAAN MODULAR OPERATING THEATRE (Terpasang By Vendor) 2,067,036,680.03
JUMLAH PEKERJAAN 2,466,165,023.66

Pek. Non Standar Gedung B - page 7 of 208


BOQ
PEKERJAAN PEMBANGUNAN RUMAH SAKIT REGIONAL
KELAS C KABUPATEN BONE - TAHAP LANJUTAN
BANGUNAN GEDUNG B
TAHUN ANGGARAN 2023

HARGA SATUAN JUMLAH HARGA


NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)
1. 2. 3. 4. 5. 6 = (4. X 5.)

PEKERJAAN NON STANDAR

I. PEKERJAAN MEKANIKAL
1.1. PEKERJAAN PENGADAAN DAN PEMASANGAN INSTALASI PEMADAMAN KEBAKARAN
1.5 Instalasi Fire Suppression set 1.00 2,250,000.00 2,250,000.00
3 Unit Cylinder Fire Suspression @ 50 kG
lengkap detector dan instalasinya
di ruang OK

JUMLAH 1.1.PEKERJAAN PENGADAAN DAN PEMASANGAN INSTALASI PEMADAMAN KEBAKARAN 2,250,000.00

II. PEKERJAAN TATA UDARA DAN VENTILASI UDARA


2.1. PEKERJAAN AIR CONDITIONING
2. Lantai - 1
1.12 Tata Udara Ruang OK 1.2
a. Indoor + Outdoor (AHU.OK.1.2 + CU.1.2) Unit 1.00 556,750,000.00 556,750,000.00
System : Precision Active Heat Pipe
IU Cooling Capacity (Nominal) : 103 500 BTUH
Total Air Flow: CFM
Fresh Air : CFM
Room Temperature : (22 ± 2) OC
Room Humidity : (55 ± 5) %
Room Pressure
Positive (1,5 ~ 2,5) Pa
Total Static500
Pressure
Pa :
Inner Motor 0,34
Power
kW Indoor
/ 3 phase
: / 50 Hz
Body panel,- Prepainted,
double skin:Thickness 0,4mm (Inside skin and outside skin)
- Insulation PUR Polyurethane, Density ≥50 Kg/m3
- Fire retendant, Class B1
- Thermal conductivity <0,024W/m.°K
Total Power
8,8 kWConsumption:
/ 3 phase / 50 Hz
Kelengkapan : Include
- CONTROLLER
StartUp Panel
Sensor Temperature + PID Controller
Sensor Humidity + PID Controller
Sensor Pressure Transducer + PID Controller
Variable Speed Drive (Inverter)
- AIR FILTER (inside the unit AC)
Media Pre Filter + Housing (inside on Unit AC)
Media Medium Filter + Housing (Inside on Unit AC)
Media Hepa Filter + Laminer Box Housing / Monolitic (On Ceiling)
- FAN (for Balancing pressure)
- ACCESSORIES
Deferential Pressure Switch (detection pressure drop for Medium Filter)
Deferential Pressure Switch (detection pressure drop for Hepa Filter)
Analoge Deferential Pressure Gauge (Detection Room Pressure)
VSD on Instalaation Ducting
Display Monitoring Digital, Suhu, Humidity & Pressure Room
Iris Dumper

JUMLAH 2.1.PEKERJAAN AIR CONDITIONING 556,750,000.00

III. PEKERJAAN TRANSPORTASI VERTIKAL DALAM GEDUNG


PNEUMATIC TUBE SYSTEM (SISTEM TRANSPORTASI TABUNG )

1. Lantai Ground Floor


Station & Diverter & Accessories
a. 3 - Way Diverter unit 2.00 40,006,000.00 80,012,000.00
b. Bottom Loading Station, incl. : Basket, Cushion and carrier rack unit 3.00 17,418,000.00 52,254,000.00

Tube & Line System


a. Tubes PVC - Diam. 110 MM RAL 7000, connecting dari Gedung A m¹ 27.00 457,000.00 12,339,000.00
b. Tubes PVC - Diam. 110 MM RAL 7000 m¹ 93.00 457,000.00 42,501,000.00
c. Tubes PVC - Diam. 110 MM Transparent m¹ 4.50 7,321,000.00 32,944,500.00
d. Bend R=800, RAL 7001, Grey bh 13.00 1,800,000.00 23,400,000.00
e. Bend R=800, RAL 7001, Transparent bh 3.00 5,100,000.00 15,300,000.00
f. Sleeve bh 93.00 150,000.00 13,950,000.00
g. Cable 2x2x0,22 + 3x2.5F m¹ 179.00 210,000.00 37,590,000.00

Carrirers & Accessories


a. Long Carrier w/ 2xChips bh 3.00 3,900,000.00 11,700,000.00
b. Short Carrier w/ 2xChips bh 12.00 3,300,000.00 39,600,000.00

2. Lantai 1
Station & Diverter & Accessories
a. 3 - Way Diverter unit 3.00 40,006,000.00 120,018,000.00
b. Multi Lab Station (2 fully automatic sending dispatchs and 1 receiving dispatch) unit 2.00 77,362,000.00 154,724,000.00
All Stations incl.: Basket, Cushion and Carrier Rack

Pek. Non Standar MEP Gedung B - page 8 of 208


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)
c. Bottom Loading Station, incl. : Basket, Cushion and carrier rack unit 5.00 17,418,000.00 87,090,000.00

Tube & Line System


a. Tubes PVC - Diam. 110 MM RAL 7000 m¹ 134.35 457,000.00 61,397,950.00
b. Tubes PVC - Diam. 110 MM Transparent m¹ 10.50 7,321,000.00 76,870,500.00
d. Bend R=800, RAL 7001, Grey bh 30.00 1,800,000.00 54,000,000.00
e. Bend R=800, RAL 7001, Transparent bh 6.00 5,100,000.00 30,600,000.00
f. Sleeve bh 185.00 150,000.00 27,750,000.00
g. Cable 2x2x0,22 + 3x2.5F m¹ 368.00 210,000.00 77,280,000.00

Carrirers & Accessories


a. Long Carrier w/ 2xChips bh 6.00 3,900,000.00 23,400,000.00
b. Short Carrier w/ 2xChips bh 24.00 3,300,000.00 79,200,000.00

4. Testing & Commissioning ls 1.00 5,000,000.00 5,000,000.00

JUMLAH III.PEKERJAAN TRANSPORTASI VERTIKAL DALAM GEDUNG 1,158,920,950.00


IV. PEKERJAAN ELEKTRIKAL
4.1. PEKERJAAN PANEL DAN UPS
- PP - OK 2.1 , termasuk trafo isolasi 10 kVA unit 1.00 75,500,000.00 75,500,000.00
- UPS, KAPASITAS : 10 kVA / 1 Phase / Backup time 30 menit unit 1.00 415,250.00 415,250.00
JUMLAH 6.1. PEKERJAAN RAK KABEL 75,915,250.00
JUMLAH PEKERJAAN 1,793,836,200.00

Pek. Non Standar MEP Gedung B - page 9 of 208


RINCIAN RENCANA ANGGARAN BIAYA
PEKERJAAN PEMBANGUNAN RUMAH SAKIT REGIONAL
KELAS C KABUPATEN BONE - TAHAP LANJUTAN
BANGUNAN GEDUNG C
TAHUN ANGGARAN 2023

HARGA SATUAN JUMLAH HARGA


NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)
1. 2. 3. 4. 5. 6 = (4. X 5.)
PEKERJAAN NON STANDAR

I. PEKERJAAN ARSITEK
1.1. PEKERJAAN PELAPIS DINDING DAN PELAPIS LANTAI
A. LANTAI GROUND FLOOR
1 Bumper guard Aluminium Extrude profil (Cover Vinyl Handrail, Endcap Section) m' 295.25 528,467.50 156,030,029.38
2 Raill guard Alumunium Extrude profil (Cover Vinyl Handrail, Endcap Section) m' 145.85 825,467.50 120,394,434.88
3 Hospital curtain & Rail (Medical Track), komplit set - Kain Type Polyester m' 155.15 1,163,662.50 180,542,236.88

B. LANTAI SATU
1 Bumper guard Aluminium Extrude profil (Cover Vinyl Handrail, Endcap Section) m' 423.89 528,467.50 224,012,088.58
2 Raill guard Alumunium Extrude profil (Cover Vinyl Handrail, Endcap Section) m' 135.00 825,467.50 111,438,112.50
3 Hospital curtain & Rail (Medical Track), komplit set - Kain Type Polyester m' 245.43 1,163,662.50 285,591,869.06
JUMLAH 1.1.PEKERJAAN PELAPIS DINDING DAN PELAPIS LANTAI 1,078,008,771.26

Pek. Non Standar Gedung C - page 10 of 208


BOQ
PEKERJAAN PEMBANGUNAN RUMAH SAKIT REGIONAL
KELAS C KABUPATEN BONE - TAHAP LANJUTAN
BANGUNAN GEDUNG C
TAHUN ANGGARAN 2023

HARGA SATUAN JUMLAH HARGA


NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)
1. 2. 3. 4. 5. 6 = (4. X 5.)

PEKERJAAN NON STANDAR

I. PEKERJAAN TRANSPORTASI VERTIKAL DALAM GEDUNG


PNEUMATIC TUBE SYSTEM (SISTEM TRANSPORTASI TABUNG )

1. Lantai Ground Floor


Station & Diverter & Accessories
a. 3 - Way Diverter unit 1.00 40,006,000.00 40,006,000.00
b. Bottom Loading Station, incl. : Basket, Cushion and carrier rack unit 2.00 17,418,000.00 34,836,000.00

Tube & Line System


a. Tubes PVC - Diam. 110 MM RAL 7000, Connecting dari Gedung A m¹ 36.00 457,000.00 16,452,000.00
b. Tubes PVC - Diam. 110 MM RAL 7000 m¹ 60.00 457,000.00 27,420,000.00
c. Tubes PVC - Diam. 110 MM Transparent m¹ 3.00 7,321,000.00 21,963,000.00
d. Bend R=800, RAL 7001, Grey bh 8.00 1,800,000.00 14,400,000.00
e. Bend R=800, RAL 7001, Transparent bh 2.00 5,100,000.00 10,200,000.00
f. Sleeve bh 58.00 150,000.00 8,700,000.00
g. Cable 2x2x0,22 + 3x2.5F m¹ 122.00 210,000.00 25,620,000.00

Carrirers & Accessories


a. Long Carrier w/ 2xChips bh 2.00 3,900,000.00 7,800,000.00
b. Short Carrier w/ 2xChips bh 8.00 3,300,000.00 26,400,000.00

2. Lantai 1
Station & Diverter & Accessories
a. Bottom Loading Station, incl. : Basket, Cushion and carrier rack unit 1.00 17,418,000.00 17,418,000.00

Tube & Line System


a. Tubes PVC - Diam. 110 MM RAL 7000 m¹ 12.00 457,000.00 5,484,000.00
b. Tubes PVC - Diam. 110 MM Transparent m¹ 1.50 7,321,000.00 10,981,500.00
d. Bend R=800, RAL 7001, Grey bh 4.00 1,800,000.00 7,200,000.00
e. Bend R=800, RAL 7001, Transparent bh 1.00 5,100,000.00 5,100,000.00
f. Sleeve bh 24.00 150,000.00 3,600,000.00
g. Cable 2x2x0,22 + 3x2.5F m¹ 43.00 210,000.00 9,030,000.00

Carrirers & Accessories


a. Long Carrier w/ 2xChips bh 1.00 3,900,000.00 3,900,000.00
b. Short Carrier w/ 2xChips bh 4.00 3,300,000.00 13,200,000.00

3. Testing & Commissioning ls 1.00 3,500,000.00 3,500,000.00

JUMLAH I.PEKERJAAN TRANSPORTASI VERTIKAL DALAM GEDUNG 313,210,500.00

Pek. Non Standar MEP Gedung C - page 11 of 208


BOQ
PEKERJAAN PEMBANGUNAN RUMAH SAKIT REGIONAL
KELAS C KABUPATEN BONE - TAHAP LANJUTAN
BANGUNAN G (BINA MENTAL)
TAHUN ANGGARAN 2023

HARGA SATUAN JUMLAH HARGA


NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)
1. 2. 3. 4. 5. 6 = (4. X 5.)
PEKERJAAN STANDAR

I. PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bowplank m' 68.50 75,212.50 5,152,056.25
JUMLAH I.PEKERJAAN PERSIAPAN 5,152,056.25

II. PEKERJAAN STRUKTUR


1.1. PEKERJAAN TANAH
1 Galian Tanah m³ 106.89 95,823.75 10,242,313.17
2 Urugan Tanah Kembali + Pemadatan m³ 45.90 104,252.50 4,785,189.75
Menggunakan tanah Galian
JUMLAH 1.1.PEKERJAAN TANAH 15,027,502.92

1.2. PEKERJAAN STRUKTUR BAWAH


A. PILE CAP DAN TIE BEAM
1 Pile Cap Type PC1 (1,800x1,800x700)
- Besi D19 Kg 1,371.03 17,061.00 23,391,169.45
- Besi D16 Kg 763.91 17,061.00 13,033,148.63
- Besi D13 Kg 112.70 17,061.00 1,922,726.02
- Bekisting Batako m² 40.32 294,217.00 11,862,829.44
- Beton Ready Mix f'c= 25 MPa m³ 17.86 1,328,415.00 23,722,404.66
- Pasir Urug t.10cm m³ 2.59 303,105.00 785,648.16
- Lantai Kerja t.5cm m³ 1.30 1,058,742.14 1,372,129.82
2 Footplat Type FP (1,500x1,500x400)
- Besi D13 Kg 370.10 17,061.00 6,314,277.77
- Bekisting Batako m² 14.40 294,217.00 4,236,724.80
- Beton Ready Mix f'c= 25 MPa m³ 5.35 1,328,415.00 7,110,810.87
- Pasir Urug t.10cm m³ 1.35 303,105.00 409,191.75
- Lantai Kerja t.5cm m³ 0.68 1,058,742.14 714,650.95
2 Balok Type SL1 (300x500)
- Besi D 22 kg 1,966.78 17,061.00 33,555,266.65
- Besi D 16 kg 239.91 17,061.00 4,093,054.94
- Besi D10 Sengkang kg 492.39 17,061.00 8,400,692.33
- Bekisting m² 45.14 294,217.00 13,280,955.38
- Beton Ready Mix f'c= 25 MPa m³ 8.81 1,328,415.00 11,698,245.77
- Pasir Urug t.10cm m³ 1.83 303,105.00 554,682.15
- Lantai Kerja t.5cm m³ 0.92 1,058,742.14 968,749.06
3 Balok Type SL2 (200x300)
- Besi D 13 kg 187.55 17,061.00 3,199,802.92
- Besi D10 Sengkang kg 182.17 17,061.00 3,108,079.45
- Bekisting m² 12.51 294,217.00 3,681,243.10
- Beton Ready Mix f'c= 25 MPa m³ 2.16 1,328,415.00 2,870,573.62
4 Balok Type BA1 (300x400)
- Besi D 19 kg 935.86 17,061.00 15,966,751.51
- Besi D 16 kg 121.85 17,061.00 2,078,841.06
- Besi D10 Sengkang kg 288.64 17,061.00 4,924,456.73
- Bekisting m² 24.78 294,217.00 7,290,697.26
- Beton Ready Mix f'c= 25 MPa m³ 3.37 1,328,415.00 4,474,753.51
5 Balok Type BA2 (200x200)
- Besi D 13 kg 33.55 17,061.00 572,409.19
- Besi D10 Sengkang kg 25.95 17,061.00 442,734.07
- Bekisting m² 2.31 241,946.22 559,379.67
- Beton Ready Mix f'c= 25 MPa m³ 0.26 1,328,415.00 351,259.87
6 Plat Lantai Type Sc (t=100mm)
- Besi P8 Single Layer kg 1,082.74 17,061.00 18,472,603.23
- Beton Ready Mix f'c= 25 MPa m³ 15.16 1,328,415.00 20,141,523.23
- Pasir Urug t.10cm m³ 15.30 303,105.00 4,637,506.50
- Lantai Kerja t.5cm m³ 7.65 1,058,742.14 8,099,377.39
JUMLAH A. PILE CAP DAN TIE BEAM 268,299,350.93

1.3. PEKERJAAN STRUKTUR ATAS


A. LANTAI LOWER GROUND
1 Kolom Type K1 (500x500)
- Besi D19 kg 1,252.09 17,061.00 21,361,909.56
- Besi D13 Sengkang kg 586.45 17,061.00 10,005,432.41
- Besi D13 Joint Sengkang kg 225.56 17,061.00 3,848,296.32
- Bekisting m² 81.60 238,646.22 19,473,531.73
- Beton Ready Mix f'c= 25 MPa m³ 9.94 1,328,415.00 13,200,535.73
2 Kolom Type K2 (250x250)
- Besi D13 kg 163.04 17,061.00 2,781,695.34
- Besi D10 Sengkang kg 164.62 17,061.00 2,808,505.52

Pek. Standar Gedung G - page 12 of 209


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)
- Besi D13 Joint Sengkang kg 42.51 17,061.00 725,288.66
- Bekisting m² 36.00 238,646.22 8,591,264.00
- Beton Ready Mix f'c= 25 MPa m³ 2.20 1,328,415.00 2,926,291.60
JUMLAH A. LANTAI LOWER GROUND 85,722,750.88

B. LANTAI DAK
1 Balok Type B1 (400x500)
- Besi D19 kg 1,462.42 17,061.00 24,950,333.91
- Besi D16 kg 328.29 17,061.00 5,601,022.55
- Besi D10 Sengkang kg 636.51 17,061.00 10,859,554.69
- Bekisting m² 45.60 241,946.22 11,032,747.73
- Beton Ready Mix f'c= 25 MPa m³ 7.69 1,328,415.00 10,216,572.98
2 Balok Type BR (200x300)
- Besi D13 kg 355.93 17,061.00 6,072,514.88
- Besi D10 Sengkang kg 363.25 17,061.00 6,197,435.52
- Bekisting m² 35.64 241,946.22 8,622,963.36
- Beton Ready Mix f'c= 25 MPa m³ 3.87 1,328,415.00 5,138,820.08
3 Plat Lantai Type Sa (t=130mm)
- Besi D10 Dobel Layer kg 1,329.25 17,061.00 22,678,419.14
- Bekisting m² 62.00 502,264.00 31,140,368.00
- Beton Ready Mix f'c= 25 MPa m³ 7.89 1,328,415.00 10,482,081.94
4 Kolom Type K1 (500x500)
- Besi D19 kg 546.99 17,061.00 9,332,165.27
- Besi D13 Sengkang kg 200.25 17,061.00 3,416,489.12
- Besi D13 Joint Sengkang kg 187.97 17,061.00 3,206,913.60
- Bekisting m² 28.80 238,646.22 6,873,011.20
- Beton Ready Mix f'c= 25 MPa m³ 3.48 1,328,415.00 4,624,033.73
JUMLAH B. LANTAI DAK 180,445,447.71

c. LANTAI DAK ATAP


1 Balok Type B2A (250x400)
- Besi D19 kg 727.18 17,061.00 12,406,433.25
- Besi D16 kg 159.10 17,061.00 2,714,341.70
- Besi D10 Sengkang kg 261.19 17,061.00 4,456,162.10
- Bekisting m² 31.60 241,946.22 7,645,500.62
- Beton Ready Mix f'c= 25 MPa m³ 3.85 1,328,415.00 5,119,480.05
JUMLAH c. LANTAI DAK ATAP 32,341,917.73

D. PEKERJAAN BAJA
1 Rangka Atap
a. Kuda-kuda Type K1
- WF 200x100x5,5x8 Kg 1,141.68 40,953.00 46,755,221.04
- Base plate (t=10mm) Kg 39.25 40,953.00 1,607,405.25
- End plate (t=10mm) Kg 27.95 40,953.00 1,144,472.54
- Plat Pengaku (t=10mm) Kg 40.82 40,953.00 1,671,701.46
- Stifenner (t=8mm) Kg 37.68 40,953.00 1,543,109.04
- Baut Angkur A 325 Ø16mm; P=400mm bh 8.00 206,459.00 1,651,672.00
- Baut A 325 Ø13mm bh 120.00 17,121.50 2,054,580.00
- Finish Cat m² 36.13 43,584.75 1,574,793.73
b. Kuda-kuda Type K2
- WF 200x100x5,5x8 Kg 1,141.68 40,953.00 46,755,221.04
- Base plate (t=10mm) Kg 39.25 40,953.00 1,607,405.25
- End plate (t=10mm) Kg 27.95 40,953.00 1,144,472.54
- Plat Pengaku (t=10mm) Kg 40.82 40,953.00 1,671,701.46
- Stifenner (t=8mm) Kg 37.68 40,953.00 1,543,109.04
- Baut Angkur A 325 Ø16mm; P=400mm bh 8.00 206,459.00 1,651,672.00
- Baut A 325 Ø13mm bh 120.00 17,121.50 2,054,580.00
- Finish Cat m² 36.13 43,584.75 1,574,793.73
c. Kuda-kuda Type JR
- WF 200x100x5,5x8 Kg 852.00 40,953.00 34,891,956.00
- End plate (t=10mm) Kg 28.26 40,953.00 1,157,331.78
- Stifenner (t=8mm) Kg 40.19 40,953.00 1,645,982.98
- Baut A 325 Ø13mm bh 48.00 17,121.50 821,832.00
- Finish Cat m² 26.96 43,584.75 1,175,219.20
d. Gording
- Lipped Channel 150x50x20x2,3 Kg 1,041.60 40,953.00 42,656,644.80
- Cleat Plat 130x130x9 Kg 30.10 40,953.00 1,232,685.30
- Baut A 325 Ø12mm bh 56.00 17,121.50 958,804.00
- Sagrod Ø12mm Kg 117.19 17,061.00 1,999,403.48
- Trekstang Ø16mm Kg 151.52 17,061.00 2,585,087.33
- Reng Usuk Baja Ringan m2 225.00 182,757.30 41,120,392.50
- Finish Cat m² 118.90 43,584.75 5,182,313.94
JUMLAH D.PEKERJAAN BAJA 251,433,563.42
PEKERJAAN NON STANDAR

I. PEKERJAAN STRUKTUR
I.I. PEKERJAAN PONDASI
1 Pekerjaan Pondasi Bored Pile
- Galian Tanah Dengan Alat Bor m 8.00 92,262.50 738,100.00

Pek. Standar Gedung G - page 13 of 209


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)
- Buis Beton Ø 800mm bh 64.00 390,335.00 24,981,440.00
- Besi D19 Kg 1,338.98 17,061.00 22,844,362.90
- Sengkang Spiral Besi D13 Kg 635.57 17,061.00 10,843,415.90
- Beton Ready Mix f'c= 25 Mpa m³ 15.83 1,328,415.00 21,033,351.96
- Pasir Urug t.10cm m³ 0.55 303,105.00 165,294.53
- Lantai Kerja t.5cm m³ 0.31 1,058,742.14 330,404.62
JUMLAH I.I. 80,936,369.91
JUMLAH PEKERJAAN 919,358,959.74

Pek. Standar Gedung G - page 14 of 209


RENCANA ANGGARAN BIAYA
PEKERJAAN PEMBANGUNAN RUMAH SAKIT REGIONAL
KELAS C KABUPATEN BONE - TAHAP LANJUTAN
BANGUNAN GEDUNG G (BINA MENTAL)
TAHUN ANGGARAN 2023

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN SATUAN VOLUME
(Rp) (Rp)
1. 2. 3. 4. 5. 6 = (4. X 5.)

I. PEKERJAAN ARSITEK
1.1. PEKERJAAN PASANGAN DAN PELAPIS DINDING
1 Pasangan dinding bata ringan uk. 200 x 600 x 100 mm m² 526.43 206,556.09 108,736,868.86
2 Pasangan plesteran semen instan tebal 1 cm m² 817.07 64,017.71 52,307,160.21
3 Membuat acian semen instan m² 847.30 39,050.00 33,086,998.62
4 Opening pintu & jendela m' 206.72 17,006.17 3,515,515.85
5 Pemasangan Kolom praktis 11/11 cm m' 312.75 105,924.50 33,127,887.38
6 Pemasangan Balok praktis 10/15 cm m' 119.20 140,719.70 16,773,788.24
7 Meja beton tebal 10 cm - Besi d8-150 m³ 0.21 4,686,751.50 995,466.02
8 Pemasangan batu granite alam pelapis meja beton m² 2.48 1,518,439.67 3,762,693.50
9 Pasangan dinding homogeneos tiles uk. 30 x 60 cm m² 174.39 371,701.00 64,820,193.99
10 Pemasangan plint homogeneos tile 10 x 60 cm cutting size m' 73.76 50,161.38 3,699,903.02
11 Pekerjaan Ornamen Islami bahan GRC t = 9 mm (façade) m² 175.96 769,825.42 135,457,711.29
12 Pemasangan batu andesite m² 54.02 382,453.50 20,659,487.90
JUMLAH 1.1.PEKERJAAN PASANGAN DAN PELAPIS DINDING 476,943,674.86

1.2. PEKERJAAN PASANGAN LANTAI


1 Pemasangan lantai homogeneous tiles 60 x 60 cm - Polished m² 148.52 384,351.00 57,083,810.52
2 Pemasangan lantai homogeneous tiles 60 x 60 cm - Unpolish m² 43.09 378,576.00 16,312,839.84
3 Pemasangan lantai HT uk. 30 x 60 cm dengan noising teras m² 7.11 366,201.00 2,603,689.11
4 Pemasangan lantai HT uk. 20 x 60 cm teras - cutting size m² 4.74 384,351.00 1,821,823.74
5 Pasir urug tebal 10cm dibawah rabat beton m³ 6.10 303,105.00 1,849,116.30
6 Rabat beton K-175 keliling bangunan tebal 5 cm m³ 3.05 1,276,885.50 3,894,871.07
7 Pemasangan Liquid Crystalline Waterproofing m² 102.53 137,500.00 14,097,875.00
8 Pasangan screed + kawat ayam pada dak atap m³ 90.91 63,995.91 5,817,867.82
JUMLAH 1.2.PEKERJAAN PASANGAN LANTAI 103,481,893.40

1.3. PEKERJAAN PASANGAN PLAFOND


1 Pemasangan Langit-langit ( Plafond ) Gypsum board , tebal 9mm m² 155.63 67,793.00 10,550,624.59
2 Pemasangan plafond GRC tebal 6 mm m² 227.24 68,593.80 15,587,495.74
3 Pemasangan rangka besi hollow galvanis 40.40mm, modul 60x60cm untuk plafond
m² 382.87 185,407.75 70,987,715.65
4 Pemasangan list profil gypsum m' 168.56 29,127.34 4,909,705.13
JUMLAH 1.3.PEKERJAAN PASANGAN PLAFOND 102,035,541.11

1.4. PEKERJAAN SANITAIR


1 Kloset duduk lengkap dengan aksesoris set 1.00 5,816,200.50 5,816,200.50
2 Kloset jongkok lengkap dengan aksesoris unit 3.00 952,624.98 2,857,874.94
3 Wastafel lengkap dengan aksesoris unit 4.00 2,737,130.00 10,948,520.00
4 Cove ligth wastafel, MDF Board m' 2.70 430,901.90 1,163,435.13
5 Kaca cermin 5 mm bevel m² 2.03 474,402.50 960,665.06
6 Hand Dryer bh 2.00 1,413,417.50 2,826,835.00
7 Jet washer set 4.00 395,254.75 1,581,019.00
8 Tisue holder bh 4.00 586,632.75 2,346,531.00
9 Soap dish bh 4.00 244,290.75 977,163.00
10 Floor drain bh 10.00 374,819.50 3,748,195.00
11 Pemasangan kran dinding Ø 1/2" bh 8.00 304,438.75 2,435,510.00
JUMLAH 1.4.PEKERJAAN SANITAIR 35,661,948.63

1.5. PEKERJAAN PENGECATAN


1 Pengecatan dinding emultion paint m² 190.21 33,260.15 6,326,446.39
2 Pengecatan dinding Wheathershield Paint m² 298.21 41,983.15 12,519,818.15
3 Pengecatan plafond Wheathershield Paint m² 75.68 49,221.15 3,725,056.63
4 Pengecatan Plafond Emultion Paint m² 198.72 40,498.15 8,047,792.37
5 Pengecatan List Plafond Emulsion Paint m' 168.56 3,620.82 610,324.58
JUMLAH 1.5.PEKERJAAN PENGECATAN 31,229,438.12

1.6. PEKERJAAN PASANGAN PINTU DAN JENDELA


PINTU TYPE
1 C-ED/PL-Uk. 900 x 2150-AL unit 5.00 3,871,742.60 19,358,713.00
2 D-GL-1 (12 MM THICK FRAMELESS DOOR)-Uk. 2 x 900 x 2150 unit 2.00 7,007,727.99 14,015,455.98

JENDELA ALUMUNIUM TYPE


1 Glass Block tipe GL-7 m² 0.84 635,449.38 533,777.48
2 Glass Block tipe GL-16 m² 5.76 635,449.38 3,660,188.40
3 Bouvenlight tipe BV 2 unit 2.00 1,418,995.80 2,837,991.60
4 Bouvenlight tipe BV 1 unit 4.00 646,696.96 2,586,787.85
5 Partisi Kaca tipe FR-1 unit 2.00 22,757,142.99 45,514,285.99
6 Partisi Kaca tipe FR-2 unit 2.00 7,356,386.11 14,712,772.23
7 Partisi Kaca tipe FR-3 unit 2.00 7,206,134.83 14,412,269.66
8 Partisi Kaca tipe FRI-1 unit 1.00 48,939,455.00 48,939,455.00
JUMLAH 1.6.PEKERJAAN PASANGAN PINTU DAN JENDELA 166,571,697.18

Pek. Standar Gedung G - page 15 of 209


HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN SATUAN VOLUME
(Rp) (Rp)
1.7. PEKERJAAN PENUTUP ATAP
1 Atap genteng metal berpasir 3mm dengan insulasi m² 459.68 255,645.50 117,515,736.99
2 Pekerjaan lisplank GRC m' 223.40 39,381.95 8,797,928.19

JUMLAH 1.7.PEKERJAAN PENUTUP ATAP 126,313,665.18


JUMLAH PEKERJAAN 1,042,237,858.48

Pek. Standar Gedung G - page 16 of 209


BOQ
PEKERJAAN PEMBANGUNAN RUMAH SAKIT REGIONAL
KELAS C KABUPATEN BONE - TAHAP LANJUTAN
BANGUNAN GEDUNG G ( BINA MENTAL )
TAHUN ANGGARAN 2023

HARGA SATUAN JUMLAH HARGA


NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)
1. 2. 3. 4. 5. 6 = (4. X 5.)
PEKERJAAN STANDAR

I. PEKERJAAN PLUMBING

1.1 PEKERJAAN INSTALASI AIR BERSIH

1. Pemipaan Air Bersih


1.1 Roof Tank, kapasitas : 2 M3 unit 1.00 11,831,000.00 11,831,000.00
1.2 GV, diameter 40 mm bh 1.00 1,623,000.00 1,623,000.00
1.3 Floating Valve dia. 40 mm set 1.00 3,303,000.00 3,303,000.00
1.4 Pemipaan Polypropelyne PN.10, termasuk fitting, sambungan penngantung & penunjang lainnya :
- PPR, diameter 40 mm m¹ 24.00 95,000.00 2,280,000.00
- PPR, diameter 32 mm m¹ 24.00 43,000.00 1,032,000.00
- PPR, diameter 1/2 " m¹ 44.00 31,000.00 1,364,000.00

JUMLAH PEKERJAAN INSTALASI AIR BERSIH 21,433,000.00

1.2 PEKERJAAN AIR KOTOR

1. Bioseptik, kapasitas : 1200 liter/day unit 1.00 6,771,000.00 6,771,000.00


2. Bak kontrol bh 1.00 1,062,000.00 1,062,000.00
3. Pemipaan
a. Instalasi Pemipaan Air kotor, PVC AW Kelas 10 kg/cm2, termasuk fitting,
penggantung & penunjang lainnya :
- Pipa PVC AW Diameter 100 mm m¹ 28.00 135,000.00 3,780,000.00
- FCO diameter 100 mm bh 3.00 345,000.00 1,035,000.00
b. Instalasi Pemipaan Air kotor, PVC AW Kelas 10 kg/cm2, termasuk fitting,
penggantung & penunjang lainnya :
- Pipa PVC AW Diameter 80 mm m¹ 34.00 87,000.00 2,958,000.00
- Pipa PVC AW Diameter 65 mm m¹ 6.00 66,000.00 396,000.00
- Pipa PVC AW Diameter 50 mm m¹ 4.00 47,000.00 188,000.00
- FCO diameter 80 mm bh 1.00 301,000.00 301,000.00
- FCO diameter 65 mm bh 2.00 246,000.00 492,000.00
c. Instalasi Pemipaan vent PVC Kelas D, 5 kg/cm2, termasuk fitting
penggantung & penunjang lainnya :
- Pipa PVC Diameter 32 mm m¹ 32.00 30,000.00 960,000.00

JUMLAH PEKERJAAN AIR KOTOR 17,943,000.00

II. PEKERJAAN ELEKTRIKAL ARUS KUAT

1. Panel listrik
Pengadaan & Pemasangan Panel Listrik termasuk peralatan bantu & penunjangnya
PP/ LP - G unit 1.00 6,161,650.00 6,161,650.00
2. Kabel Feeder listrik
Kabel dari PP/ LP- F ke PP/LP-G, NYY 4 x 6 mm m' 60.00 71,000.00 4,260,000.00
3. Lampu Penerangan, Saklar & Stop kontak
Pengadaan & Pemasangan Fixtures lampu lengkap dengan armature
- LED 1 x 8 Watt / Pada Cove Wastafel bh 3.00 206,000.00 618,000.00
- LED 1 x 16 Watt Tipe TKI bh 2.00 216,000.00 432,000.00
- Lampu LED Strip 3 W/ Meter m 34.00 121,000.00 4,114,000.00
- Lampu Down Light LED 6 W bh 4.00 140,000.00 560,000.00
- Lampu Down Light LED 12 W bh 18.00 173,000.00 3,114,000.00
- Lampu Down Light Spot LED 15 W bh 8.00 266,000.00 2,128,000.00
4. Saklar dan Stop kontak
- Saklar tunggal bh 6.00 55,000.00 330,000.00
- Saklar ganda bh 7.00 72,000.00 504,000.00
- Stop Kontak 200 W / 16 A / 1 phase bh 6.00 83,000.00 498,000.00
- Stop Kontak 350 W / 16 A / 1 phase bh 2.00 83,000.00 166,000.00
- Stop Kontak 500 W / 16 / 1 phase bh 1.00 83,000.00 83,000.00
5. Titik instalasi
- Instalasi penerangan, NYM 2 x 1,5 mm2 dalam conduit PVC ttk 69.00 310,000.00 21,390,000.00
- Instalasi stop kontak 1 Phase, NYM 3 x 2,5 mm2 dalam conduit PVC ttk 9.00 458,000.00 4,122,000.00

JUMLAH PEKERJAAN ELEKTRIKAL ARUS KUAT 48,480,650.00

III. PEKERJAAN TATA UDARA & FIRE EXTINGUISHER

1. Exhaust Fan
- CF GF.1 s/d CF GF.9 , kapasitas : 100 CFM / Ceiling Mouted unit 4.00 1,053,000.00 4,212,000.00
- Saluran udara PVC diameter 6 " m' 6.00 248,000.00 1,488,000.00
- Saluran udara PVC diameter 4 " m' 6.00 135,000.00 810,000.00
- Exhaust Air Louver 20x20 cm unit 4.00 601,000.00 2,404,000.00
2. Fire Extinguisher ( Dry Chemical ) kapasitas : 3 kG + Bracket unit 2.00 1,769,000.00 3,538,000.00
3. Titik instalasi :
- Instalasi Unit Fan, NYM 3 x 2,5 mm2 dalam konduit ttk 4.00 472,000.00 1,888,000.00

JUMLAH PEKERJAAN TATA UDARA & FIRE EXTINGUISHER 14,340,000.00


PEKERJAAN NON STANDAR

I. PEKERJAAN ELEKTRONIK

Pek. Standar MEP Gedung G - page 17 of 209


1.1. PEKERJAAN TATA SUARA
a. LANTAI GROUND FLOOR
SOUND SYSTEM ANNOUNCEMENT / MIMBAR
1. Mixer Power Amplifier 60 W unit 1.00 2,323,000.00 2,323,000.00
2. Box Speaker 15 W unit 4.00 444,000.00 1,776,000.00
3. Desk / Gooseneck Microphone bh 1.00 980,000.00 980,000.00
4. Titik Instalasi Box Speaker, NYMHY 3 x 1,5 mm2, dalam conduit PVC HI ttk 4.00 453,000.00 1,812,000.00

JUMLAH 1.1. PEKERJAAN TATA SUARA 6,891,000.00

Pek. Standar MEP Gedung G - page 18 of 209


2.2. PEKERJAAN SYSTEM KOMUNIKASI DAN DATA ( ICT )
a. LANTAI GROUND FLOOR
1. 19" Wallmount Rack -G :
1 Unit WallMount Rack 5 U incl. power distribution and Fan set 1.00 2,337,500.00 2,337,500.00
Optical Terminal Box (OTB) 12 Port unit 1.00 2,063,970.00 2,063,970.00
Patch Panel UTP Cat-6 24 Port Full Loaded unit 2.00 2,422,500.00 4,845,000.00
Access Switch 24*10/100/1000 Mbps POE+4SFP Ports unit 1.00 22,661,000.00 22,661,000.00
UPS 500VA unit 1.00 4,675,000.00 4,675,000.00
Patchcord UTP Cat-6 bh 9.00 106,250.00 956,250.00
1000BASE-SX SFP Transceiver Module (MMF, 850nm, 300m, LC, DOM) bh 1.00 1,470,000.00 1,470,000.00
Wiring Management unit 1.00 435,000.00 435,000.00
2. Kabel Feeder, Dari :
- OTB-G ke Distribution Switch Gedung C, Kabel Fiber Optik Multimode 6 Core m' 126.00 145,000.00 18,270,000.00
- Access Switch POE ke OTB-G, Kabel Fiber Optik Multimode 2 Core m' 2.00 86,000.00 172,000.00
3. Instalasi IP CCTV :
- IP Bullet Camera set 3.00 2,618,000.00 7,854,000.00
- Instalasi IP Camera, Kabel UTP Cat-6, 4 Pair dlm PVC HI Conduit 20 mm 2 ttk 3.00 1,073,000.00 3,219,000.00

JUMLAH 2.2. PEKERJAAN SYSTEM KOMUNIKASI DAN DATA ( ICT ) 68,958,720.00


JUMLAH PEKERJAAN 178,046,370.00

Pek. Standar MEP Gedung G - page 19 of 209


RINCIAN RENCANA ANGGARAN BIAYA
PEKERJAAN PEMBANGUNAN RUMAH SAKIT REGIONAL
KELAS C KABUPATEN BONE - TAHAP LANJUTAN
BANGUNAN H2 (ASRAMA 2)
TAHUN ANGGARAN 2023

HARGA SATUAN JUMLAH HARGA


NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)
1. 2. 3. 4. 5. 6 = (4. X 5.)

I. PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bowplank m' 93.00 75,212.50 6,994,762.50
JUMLAH I.PEKERJAAN PERSIAPAN 6,994,762.50

II. PEKERJAAN STRUKTUR


1.1. PEKERJAAN TANAH
1 Galian Tanah m³ 171.67 95,823.75 16,449,679.87
2 Urugan Tanah Kembali + Pemadatan m³ 98.35 104,252.50 10,253,155.19
Menggunakan tanah Galian
JUMLAH 1.1.PEKERJAAN TANAH 26,702,835.05

1.2. PEKERJAAN STRUKTUR BAWAH


A. PILE CAP DAN TIE BEAM
1 Footplat Type FP (1,500x1,500x400)
- Besi D13 Kg 2,220.60 17,061.00 37,885,666.61
- Bekisting Batako m² 86.40 294,217.00 25,420,348.80
- Beton Ready Mix f'c= 25 MPa m³ 32.12 1,328,415.00 42,664,865.22
- Pasir Urug t.10cm m³ 8.10 303,105.00 2,455,150.50
- Lantai Kerja t.5cm m³ 4.05 1,058,742.14 4,287,905.68
2 Balok Type SL1 (200x300)
- Besi D 13 kg 710.19 17,061.00 12,116,587.07
- Besi D10 Sengkang kg 722.11 17,061.00 12,319,977.57
- Bekisting m² 51.00 294,217.00 15,005,067.00
- Beton Ready Mix f'c= 25 MPa m³ 8.82 1,328,415.00 11,713,353.32
- Pasir Urug t.10cm m³ 3.00 303,105.00 909,315.00
- Lantai Kerja t.5cm m³ 1.50 1,058,742.14 1,588,113.21
3 Balok Type SL2 (200x200)
- Besi D 13 kg 412.61 17,061.00 7,039,566.43
- Besi D10 Sengkang kg 334.37 17,061.00 5,704,737.40
- Bekisting m² 30.45 294,217.00 8,958,025.00
- Beton Ready Mix f'c= 25 MPa m³ 3.49 1,328,415.00 4,631,974.18
- Pasir Urug t.10cm m³ 1.79 303,105.00 542,861.06
- Lantai Kerja t.5cm m³ 0.90 1,058,742.14 948,103.59
JUMLAH A. PILE CAP DAN TIE BEAM 194,191,617.64

1.3. PEKERJAAN STRUKTUR ATAS


A. LANTAI DASAR
1 Plat Lantai Type Sc (t=100mm)
- Besi P8 Single Layer kg 2,043.95 17,061.00 34,871,750.99
- Beton Ready Mix f'c= 25 MPa m³ 31.49 1,328,415.00 41,831,289.93
- Pasir Urug t.10cm m³ 31.75 303,105.00 9,623,583.75
- Lantai Kerja t.5cm m³ 15.88 1,058,742.14 16,807,531.52
2 Kolom Type KP (250x250)
- Besi D13 kg 414.78 17,061.00 7,076,541.93
- Besi D10 Sengkang kg 412.64 17,061.00 7,039,987.18
- Besi D13 Joint Sengkang kg 59.35 17,061.00 1,012,559.86
- Bekisting m² 91.20 238,646.22 21,764,535.47
- Beton Ready Mix f'c= 25 MPa m³ 5.59 1,328,415.00 7,421,902.92
JUMLAH A. LANTAI DASAR 147,449,683.54

B. LANTAI DAK ATAP


1 Balok Type BR (200x300)
- Besi D13 kg 710.19 17,061.00 12,116,587.07
- Besi D10 Sengkang kg 794.54 17,061.00 13,555,720.00
- Bekisting m² 81.65 241,946.22 19,754,425.15
- Beton Ready Mix f'c= 25 MPa m³ 8.88 1,328,415.00 11,796,742.11
JUMLAH B. LANTAI DAK ATAP 57,223,474.33

C. PEKERJAAN BAJA
1 Rangka Atap
- WF 200x100x5,5x8 Kg 3,876.60 40,953.00 158,758,399.80
- Base plate (t=10mm) Kg 274.75 40,953.00 11,251,836.75
- End plate (t=10mm) Kg 97.81 40,953.00 4,005,653.88
- Plat Pengaku (t=10mm) Kg 285.74 40,953.00 11,701,910.22
- Stifenner (t=8mm) Kg 246.18 40,953.00 10,081,645.73
- Baut Angkur A 325 Ø16mm; P=400mm bh 56.00 206,459.00 11,561,704.00
- Baut A 325 Ø13mm bh 336.00 17,121.50 5,752,824.00
- Lipped Channel 150x50x20x2,3 Kg 3,214.08 40,953.00 131,626,218.24
- Cleat Plat 130x130x9 Kg 361.20 40,953.00 14,792,223.60
- Baut A 325 Ø12mm bh 672.00 17,121.50 11,505,648.00

Pek. Standar Gedung H2 - page 20 of 209


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)
- Sagrod Ø12mm Kg 375.01 17,061.00 6,398,091.15
- Trekstang Ø16mm Kg 321.98 17,061.00 5,493,310.58
- Reng Usuk Baja Ringan m2 675.00 182,757.30 123,361,177.50
- Finish Cat m² 489.58 43,584.75 21,338,387.53
JUMLAH C.PEKERJAAN BAJA 527,629,030.97
JUMLAH PEKERJAAN 960,191,404.04

Pek. Standar Gedung H2 - page 21 of 209


RENCANA ANGGARAN BIAYA
PEKERJAAN PEMBANGUNAN RUMAH SAKIT REGIONAL
KELAS C KABUPATEN BONE - TAHAP LANJUTAN
BANGUNAN GEDUNG H (ASRAMA 2)
TAHUN ANGGARAN 2023

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN SATUAN VOLUME
(Rp) (Rp)
1. 2. 3. 4. 5. 6 = (4. X 5.)
PEKERJAAN STANDAR

III. PEKERJAAN ARSITEK


3.1. PEKERJAAN PASANGAN DAN PELAPIS DINDING
1 Pemasangan Dinding Bata Merah 1/2 Batu ,Campuran 1 SP : 5 PP m² 719.27 148,714.50 106,965,878.42
2 Pemasangan Pelesteran , 1 SP : 5 PP, tebal 15 mm m² 1,107.38 51,404.10 56,923,640.94
3 Membuat acian semen m² 1,151.06 54,642.50 62,896,550.16
4 Opening pintu & jendela m' 278.80 24,164.73 6,737,126.31
5 Pemasangan Kolom praktis 11/11 cm m' 203.60 105,924.50 21,566,228.20
6 Pemasangan Balok praktis 10/15 cm m' 146.20 140,719.70 20,573,220.14
7 Pasangan dinding homogeneos tiles uk. 30 x 60 cm m² 100.81 371,701.00 37,471,921.21
8 Pemasangan plint homogeneos tile 10 x 60 cm cutting size m' 259.50 50,161.38 13,016,876.81
9 Pemasangan batu andesite m² 104.56 382,453.50 39,990,294.09
10 Pekerjaan Alumunium Composite Panel PVDF 0.3 mm Alloy 3003 m² 146.44 751,113.00 109,992,987.72
JUMLAH 3.1.PEKERJAAN PASANGAN DAN PELAPIS DINDING 476,134,724.00

3.2. PEKERJAAN PASANGAN LANTAI


1 Pemasangan lantai homogeneous tiles 60 x 60 cm - Polished m² 318.33 384,351.00 122,348,532.08
2 Pemasangan lantai homogeneous tiles 60 x 60 cm - Unpolish m² 62.58 378,576.00 23,691,286.08
3 Pemasangan lantai HT uk. 30 x 60 cm dengan noising teras m² 6.62 366,201.00 2,422,419.62
4 Pemasangan lantai HT uk. 20 x 60 cm teras - cutting size m² 5.88 384,351.00 2,259,983.88
5 Pasir urug tebal 10cm dibawah rabat beton m³ 7.24 303,105.00 2,194,480.20
6 Rabat beton K-175 keliling bangunan tebal 5 cm m³ 3.62 1,276,885.50 4,622,325.51
JUMLAH 3.2.PEKERJAAN PASANGAN LANTAI 157,539,027.36

3.3. PEKERJAAN PASANGAN PLAFOND


1 Pemasangan Langit-langit ( Plafond ) Gypsum board , tebal 9mm m² 261.90 67,793.00 17,754,986.70
2 Pemasangan plafond GRC tebal 4 mm m² 346.29 68,593.80 23,753,042.99
3 Pemasangan rangka besi hollow galvalum 40.40. 0.45 mm, modul 60x60cm untuk plafond m² 608.19 185,407.75 112,762,317.75
4 Pemasangan list profil gypsum m' 362.46 29,127.34 10,557,497.15
JUMLAH 3.3.PEKERJAAN PASANGAN PLAFOND 164,827,844.59

3.4. PEKERJAAN SANITAIR


1 Kloset duduk lengkap dengan aksesoris set 9.00 5,816,200.50 52,345,804.50
2 Wastafel gantung lengkap dengan aksesoris + kran set 9.00 1,487,904.00 13,391,136.00
3 Cove ligth wastafel, MDF Board m' 5.40 430,901.90 2,326,870.26
4 Kaca cermin 5 mm bevel m² 4.05 474,402.50 1,921,330.13
5 Jet washer set 9.00 395,254.75 3,557,292.75
6 Tisue holder bh 9.00 586,632.75 5,279,694.75
7 Soap dispanser bh 9.00 244,290.75 2,198,616.75
8 Floor drain bh 17.00 374,819.50 6,371,931.50
9 Pemasangan kran dinding Ø 1/2" bh 9.00 304,438.75 2,739,948.75
10 Hand shower dengan kran panas & dingin lengkap aksesories set 8.00 1,609,654.75 12,877,238.00
JUMLAH 3.4.PEKERJAAN SANITAIR 103,009,863.39

3.5. PEKERJAAN PENGECATAN


1 Pengecatan dinding emultion paint m² 741.05 33,260.15 24,647,367.64
2 Pengecatan dinding Wheathershield Paint m² 232.22 41,983.15 9,749,117.18
3 Pengecatan Plafond Emultion Paint m² 324.48 40,498.15 13,140,839.71
4 Pengecatan plafond Wheathershield Paint m² 58.83 49,221.15 2,895,680.25
5 Pengecatan List Plafond Emulsion Paint m' 362.46 3,620.82 1,312,400.60
JUMLAH 3.5.PEKERJAAN PENGECATAN 51,745,405.39

3.6. PEKERJAAN PASANGAN PINTU DAN JENDELA


PINTU TYPE
1 A-ED-Uk. 2 x 900 x 2850-AL-W/. BOUVENLIGHT 6 MM THICK CLEAR FLOAT GLASS unit 3.00 8,051,895.63 24,155,686.90
2 A-ED-Uk. 900 x 2150-AL-W/. BOUVENLIGHT 6 MM THICK CLEAR FLOAT GLASS unit 10.00 4,554,768.53 45,547,685.26
3 C-ED/PL-Uk. 750 x 2150-AL unit 9.00 3,245,685.14 29,211,166.22

JENDELA TYPE
1 Window tipe W 3 unit 2.00 6,312,016.60 12,624,033.21
2 Window tipe W 2 unit 10.00 4,333,045.14 43,330,451.35
3 Bouvenlight tipe BV 5 unit 2.00 5,322,727.99 10,645,455.98
4 Bouvenlight tipe BV 2 unit 2.00 1,732,766.02 3,465,532.04
5 Bouvenlight tipe BV 1 unit 8.00 932,025.89 7,456,207.15
JUMLAH 3.6.PEKERJAAN PASANGAN PINTU DAN JENDELA 176,436,218.10

3.7. PEKERJAAN PENUTUP ATAP


1 Atap genteng metal berpasir 3mm dengan insulasi alumunium foil m² 839.09 255,645.50 214,509,829.55
2 Pekerjaan lisplank GRC m' 167.17 39,381.95 6,583,402.24

JUMLAH 3.7.PEKERJAAN PENUTUP ATAP 221,093,231.79


JUMLAH PEKERJAAN 1,350,786,314.60

Pek. Standart Gedung H2 - page 22 of 208


BOQ
PEKERJAAN PEMBANGUNAN RUMAH SAKIT REGIONAL
KELAS C KABUPATEN BONE - TAHAP LANJUTAN
BANGUNAN GEDUNG H.2 ( ASRAMA )
TAHUN ANGGARAN 2023

HARGA SATUAN JUMLAH HARGA


NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)
1. 2. 3. 4. 5. 6 = (4. X 5.)
PEKERJAAN STANDAR

I. PEKERJAAN PLUMBING

1.1 PEKERJAAN INSTALASI AIR BERSIH

1. Pemipaan Air Bersih


1.1 Meter Air + Gate Valve unit 1.00 250,000.00 250,000.00
1.2 Pemipaan Polypropelyne PN.10, termasuk fitting, sambungan penngantung & penunjang lainnya :
- PPR, diameter 32 mm m¹ 70.00 63,000.00 4,410,000.00
- PPR, diameter 20 mm m¹ 66.00 30,000.00 1,980,000.00
2. Sumur Dangkal +/- 40 m atau sesuai sumber air m¹ 40.00 420,000.00 16,800,000.00
- Pengadaan dan pemasangan Casing PVC AW 6" , screen m¹ 40.00 436,000.00 17,440,000.00
- Submersible Pump (POMPA CELUP SATELIT TANAM 1/2 HP 0.5 HP 3" SHIMIZU SP315K 50-55
set 1.00 5,288,000.00 5,288,000.00
METER termasuk kabel 30 m set )
- Penambahan Kabel pompa NYMHY 2x0.75 mm m' 15.00 7,500.00 112,500.00
- Pipa PVC 1 " m¹ 50.00 29,000.00 1,450,000.00
- Pipa PPR PN10, dia.25 mm dari dischard ke water tank m¹ 35.00 43,000.00 1,505,000.00
- Gate Valve 1" bh 2.00 944,000.00 1,888,000.00
- Kabel NYY 3x2.5 mm2 dari PP. Asrama ke PC. Pompa m¹ 30.00 18,500.00 555,000.00
3. Instalasi Air Panas
3.1 Gate valve
- GV, diameter 32 mm bh 8.00 1,329,000.00 10,632,000.00
3.2 Pemipaan Polypropelyne PN.20, termasuk fitting, sambungan penngantung & penunjang lainnya :
- PPR, diameter 32 mm m¹ 48.00 95,000.00 4,560,000.00
3.3 Electric Water Heater ( EWH ) ex Ariston
Kapasitas : 30 liter bh 8.00 3,072,000.00 24,576,000.00
3.4 Instalasi daya listri EWH, NYM 3 x 2,5 mm2 ttk 8.00 458,000.00 3,664,000.00

JUMLAH PEKERJAAN INSTALASI AIR BERSIH 95,110,500.00

1.2 PEKERJAAN AIR KOTOR

1. Bak kontrol bh 1.00 1,062,000.00 1,062,000.00


STP cap. 6 m3/day unit 1.00 40,926,000.00 40,926,000.00
2. Pemipaan
a. Instalasi Pemipaan Air kotor, PVC AW Kelas 10 kg/cm2, termasuk fitting,
penggantung & penunjang lainnya :
- Pipa PVC AW Diameter 100 mm m¹ 83.00 135,000.00 11,205,000.00
- FCO diameter 100 mm bh 4.00 345,000.00 1,380,000.00
b. Instalasi Pemipaan Air kotor, PVC AW Kelas 10 kg/cm2, termasuk fitting,
penggantung & penunjang lainnya :
- Pipa PVC AW Diameter 80 mm m¹ 66.00 87,000.00 5,742,000.00
- Pipa PVC AW Diameter 65 mm m¹ 51.00 66,000.00 3,366,000.00
- Pipa PVC AW Diameter 50 mm m¹ 20.00 47,000.00 940,000.00
- FCO diameter 80 mm bh 2.00 87,000.00 174,000.00
- FCO diameter 65 mm bh 16.00 246,000.00 3,936,000.00
Portable Greasetrap kap. 25 kG bh 1.00 4,214,000.00 4,214,000.00
c. Instalasi Pemipaan vent PVC Kelas D, 5 kg/cm2, termasuk fitting
penggantung & penunjang lainnya :
- Pipa PVC Diameter 32 mm m¹ 45.00 26,000.00 1,170,000.00

JUMLAH PEKERJAAN AIR KOTOR 74,115,000.00

II. PEKERJAAN ELEKTRIKAL ARUS KUAT

1. Panel listrik
Pengadaan & Pemasangan Panel Listrik termasuk peralatan bantu & penunjangnya
SDP - H unit 1.00 22,089,595.00 22,089,595.00
PP - AB unit 1.00 7,930,120.00 7,930,120.00
2. Power Panel Asrama
PP/ LP - H2 unit 1.00 9,571,045.00 9,571,045.00
3. Lampu Penerangan, Saklar & Stop kontak
Pengadaan & Pemasangan Fixtures lampu lengkap dengan armature
- LED 1 x 16 Watt Tipe Dust Proof bh 1.00 216,000.00 216,000.00
- Lampu Down Light LED 6 W bh 9.00 140,000.00 1,260,000.00
- Lampu Down Light LED 9 W bh 16.00 173,000.00 2,768,000.00
- Lampu Down Light LED 12 W bh 19.00 173,000.00 3,287,000.00
- Lampu Dinding LED 5 W + saklar bh 8.00 266,000.00 2,128,000.00
4. Saklar dan Stop kontak
- Saklar tunggal bh 11.00 55,000.00 605,000.00
- Saklar ganda bh 11.00 72,000.00 792,000.00
- Stop Kontak 200 W / 16 A / 1 phase bh 29.00 83,000.00 2,407,000.00
- Stop Kontak 500 W / 16 / 1 phase bh 9.00 83,000.00 747,000.00
- Stop Kontak 2 x 200 W / 16 A / 1 phase bh 8.00 61,000.00 488,000.00
5. Titik instalasi
- Instalasi penerangan, NYM 2 x 1,5 mm2 dalam conduit PVC ttk 53.00 310,000.00 16,430,000.00
- Instalasi stop kontak 1 Phase, NYM 3 x 2,5 mm2 dalam conduit PVC ttk 46.00 458,000.00 21,068,000.00

JUMLAH PEKERJAAN ELEKTRIKAL ARUS KUAT 91,786,760.00


PEKERJAAN NON STANDAR

Pek. Standar Gedung H2 - page 23 of 208


I. PEKERJAAN TATA UDARA

1. Unit AC Single Split


- OU + IU GF.1, kapasitas : 27 972 BTU/h - Ceilling Mounted Cassette unit 1.00 31,319,000.00 31,319,000.00
- OU + IU GF.2, kapasitas : 13 778 BTU/h - Wall Mounted unit 1.00 6,050,000.00 6,050,000.00
- OU + IU GF.3, kapasitas : 13 778 BTU/h - Wall Mounted unit 1.00 6,050,000.00 6,050,000.00
- OU + IU GF.4, kapasitas : 13 778 BTU/h - Wall Mounted unit 1.00 6,050,000.00 6,050,000.00
- OU + IU GF.5, kapasitas : 13 778 BTU/h - Wall Mounted unit 1.00 6,050,000.00 6,050,000.00
- OU + IU GF.6, kapasitas : 21 782 BTU/h - Ceilling Mounted Cassette unit 1.00 31,319,000.00 31,319,000.00
- OU + IU GF.7, kapasitas : 13 778 BTU/h - Wall Mounted unit 1.00 6,050,000.00 6,050,000.00
- OU + IU GF.8, kapasitas : 13 778 BTU/h - Wall Mounted unit 1.00 6,050,000.00 6,050,000.00
- OU + IU GF.9, kapasitas : 13 778 BTU/h - Wall Mounted unit 1.00 6,050,000.00 6,050,000.00
- OU + IU GF.10, kapasitas : 13 778 BTU/h - Wall Mounted unit 1.00 6,050,000.00 6,050,000.00
2. Pipa Refigerant berisolasi m' 30.00 245,000.00 7,350,000.00
3. Pipa Drain berisolasi
- dia. 1 " m' 20.00 59,000.00 1,180,000.00
4. Exkaust Fan
- EF GF.1, kapasitas : 300 CFM - Axial Inline + Box Peredam unit 1.00 3,291,000.00 3,291,000.00
- CF GF.1 s/ CF GF.9, kapasitas : 100 Cfm - Ceiling Mounted unit 9.00 1,053,000.00 9,477,000.00
5. Saluran Udara Exhaus Fan
- PVC diameter 6 " m' 12.00 248,000.00 2,976,000.00
- PVC diameter 4 " m' 25.00 135,000.00 3,375,000.00
- Exhaust Air Louver bh 10.00 601,464.29 6,014,642.86
6. Kitchen Hood bh 1.00 106,464.29 106,464.29
7. Instalasi daya listrik
- Instalasi Kabel Power Unit AC & Kontrol Dari PP AC unit AC-Wall type ttk 10.00 587,000.00 5,870,000.00
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²
- Instalasi Kabel Power Unit EF/CF Dari PP AC unit Fan ttk 10.00 587,000.00 5,870,000.00
d/kabel NYM 3 x 2,5 mm² dlm PVC Conduit Ø 20 mm²
8. Fire Extinguisher 3 kG lengkap bracket bh 2.00 1,769,000.00 3,538,000.00
JUMLAH PEKERJAAN TATA UDARA 160,086,107.14

II. PEKERJAAN ELEKTRONIK


2.1. PEKERJAAN SYSTEM KOMUNIKASI DAN DATA ( ICT )
a. LANTAI GROUND FLOOR
1. 19" Wallmount Rack -H1 :
WallMount Rack 5 U incl. power distribution and Fan set 1.00 2,337,500.00 2,337,500.00
Optical Terminal Box (OTB) 12 Port unit 1.00 2,063,970.00 2,063,970.00
Patch Panel UTP Cat-6 24 Port Full Loaded unit 2.00 2,422,500.00 4,845,000.00
Access Switch 24*10/100/1000 Mbps POE+4SFP Ports unit 1.00 22,661,000.00 22,661,000.00
Access Switch 24*10/100/1000 Mbps+4SFP Ports unit 1.00 15,827,000.00 15,827,000.00
UPS 500VA unit 1.00 4,675,000.00 4,675,000.00
Patchcord UTP Cat-6 bh 15.00 106,250.00 1,593,750.00
1000BASE-SX SFP Transceiver Module (MMF, 850nm, 300m, LC, DOM) bh 2.00 1,470,000.00 2,940,000.00
Wiring Management unit 2.00 435,000.00 870,000.00
2. Kabel Feeder, Dari :
- OTB-H ke OTB-G, Kabel Fiber Optik Multimode 4 Core m' 156.00 145,000.00 22,620,000.00
- Access Switch ke OTB-H, Kabel Fiber Optik Multimode 2 Core m' 2.00 86,000.00 172,000.00
- Access Switch POE ke OTB-H, Kabel Fiber Optik Multimode 2 Core m' 2.00 86,000.00 172,000.00
3. Instalasi Access Point (Wi-Fi) :
- Access Point (Wi-Fi) set 2.00 2,145,000.00 4,290,000.00
- Instalasi Access Point, Kabel UTP Cat-6, 4 Pair dlm PVC HI Conduit 20 mm 2 ttk 2.00 932,000.00 1,864,000.00
4. Instalasi IPTV :
- Outlet IPTV (RJ-45) bh 9.00 125,000.00 1,125,000.00
- Set Top Box (STB) IPTV set 9.00 1,769,000.00 15,921,000.00
- Instalasi Outlet IPTV, Kabel UTP Cat-6, 4 Pair dlm PVC HI Conduit 20 mm 2 ttk 9.00 1,356,000.00 12,204,000.00
5. Instalasi IP Phone :
- Outlet IP Phone (RJ-45) bh 1.00 125,000.00 125,000.00
- Handset IP Phone set 1.00 1,871,000.00 1,871,000.00
- Instalasi Outlet IP Phone, kabel UTP Cat-6, 4 Pair dlm PVC HI Conduit 20 mm 2 ttk 1.00 1,007,000.00 1,007,000.00
6. Instalasi IP CCTV :
- IP Dome Camera set 3.00 2,244,000.00 6,732,000.00
- Instalasi IP Camera, Kabel UTP Cat-6, 4 Pair dlm PVC HI Conduit 20 mm 2 ttk 3.00 1,073,000.00 3,219,000.00

JUMLAH 2.1. PEKERJAAN SYSTEM KOMUNIKASI DAN DATA ( ICT ) 129,135,220.00


JUMLAH PEKERJAAN 550,233,587.14

Pek. Standar Gedung H2 - page 24 of 208


BOQ
PEKERJAAN PEMBANGUNAN RUMAH SAKIT REGIONAL
KELAS C KABUPATEN BONE - TAHAP LANJUTAN
BANGUNAN M (SELASAR 2 LANTAI RAMP)
TAHUN ANGGARAN 2023

HARGA SATUAN JUMLAH HARGA


NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)
1. 2. 3. 4. 5. 6 = (4. X 5.)
PEKERJAAN STANDAR

I. PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bowplank m' 310.00 75,212.50 23,315,875.00
JUMLAH I.PEKERJAAN PERSIAPAN 23,315,875.00

II. PEKERJAAN STRUKTUR


1.1. PEKERJAAN TANAH
1 Galian Tanah m³ 280.00 95,823.75 26,830,650.00
2 Urugan Tanah Kembali + Pemadatan m³ 84.00 104,252.50 8,757,210.00
Menggunakan tanah Galian
JUMLAH 1.1.PEKERJAAN TANAH 35,587,860.00

1.2. PEKERJAAN STRUKTUR BAWAH


A. PILE CAP DAN TIE BEAM
1 Pile Cap Type PC1 (1,800x1,800x700)
- Besi D19 Kg 3,133.79 17,061.00 53,465,530.18
- Besi D16 Kg 1,666.72 17,061.00 28,435,960.65
- Besi D13 Kg 225.39 17,061.00 3,845,452.05
- Bekisting Batako m² 80.64 294,217.00 23,725,658.88
- Beton Ready Mix f'c= 25 MPa m³ 35.65 1,328,415.00 47,355,015.77
- Pasir Urug t.10cm m³ 5.18 303,105.00 1,571,296.32
- Lantai Kerja t.5cm m³ 2.59 1,058,742.14 2,744,259.63
2 Footplat Type FP (1,500x1,500x400)
- Besi D13 Kg 2,706.36 17,061.00 Dikerjakan TA 2022
- Bekisting Batako m² 93.60 294,217.00 Dikerjakan TA 2022
- Beton Ready Mix f'c= 25 MPa m³ 34.76 1,328,415.00 Dikerjakan TA 2022
- Pasir Urug t.10cm m³ 8.78 303,105.00 Dikerjakan TA 2022
- Lantai Kerja t.5cm m³ 4.39 1,058,742.14 Dikerjakan TA 2022
2 Balok Type SL1 (300x500)
- Besi D 22 kg 4,046.36 17,061.00 69,034,959.16
- Besi D 16 kg 429.31 17,061.00 7,324,414.11
- Besi D10 Sengkang kg 826.78 17,061.00 14,105,640.10
- Bekisting m² 72.89 294,217.00 21,445,477.13
- Beton Ready Mix f'c= 25 MPa m³ 14.10 1,328,415.00 18,730,026.22
- Pasir Urug t.10cm m³ 2.96 303,105.00 895,675.28
- Lantai Kerja t.5cm m³ 1.48 1,058,742.14 1,564,291.52
3 Balok Type SL2 (200x300)
- Besi D 13 kg 945.26 17,061.00 Dikerjakan TA 2022
- Besi D10 Sengkang kg 898.80 17,061.00 Dikerjakan TA 2022
- Bekisting m² 59.98 294,217.00 Dikerjakan TA 2022
- Beton Ready Mix f'c= 25 MPa m³ 10.35 1,328,415.00 Dikerjakan TA 2022
4 Balok Type BA1 (300x400)
- Besi D 19 kg 785.58 17,061.00 13,402,836.32
- Besi D 16 kg 95.96 17,061.00 1,637,221.98
- Besi D10 Sengkang kg 225.70 17,061.00 3,850,703.00
- Bekisting m² 18.82 294,217.00 5,535,987.07
- Beton Ready Mix f'c= 25 MPa m³ 2.55 1,328,415.00 3,383,405.62
5 Plat Lantai Type Sc (t=100mm)
- Besi P8 Single Layer kg 2,043.95 17,061.00 Dikerjakan TA 2022
- Beton Ready Mix f'c= 25 MPa m³ 36.74 1,328,415.00 Dikerjakan TA 2022
- Pasir Urug t.10cm m³ 37.00 303,105.00 Dikerjakan TA 2022
- Lantai Kerja t.5cm m³ 18.50 1,058,742.14 Dikerjakan TA 2022
JUMLAH A. PILE CAP DAN TIE BEAM 322,053,810.99

1.3. PEKERJAAN STRUKTUR ATAS


A. LANTAI DASAR
1 Kolom Type K1 (500x500)
- Besi D19 kg 2,375.98 17,061.00 40,536,592.88
- Besi D13 Sengkang kg 1,885.51 17,061.00 32,168,685.39
- Besi D13 Joint Sengkang kg 451.12 17,061.00 7,696,592.63
- Bekisting m² 153.60 238,646.22 36,656,059.73
- Beton Ready Mix f'c= 25 MPa m³ 18.60 1,328,415.00 24,708,077.01
2 Kolom Type K2 (250x250)
- Besi D13 kg 1,011.02 17,061.00 Dikerjakan TA 2022
- Besi D10 Sengkang kg 1,005.80 17,061.00 Dikerjakan TA 2022
- Besi D13 Joint Sengkang kg 276.32 17,061.00 Dikerjakan TA 2022
- Bekisting m² 222.30 238,646.22 Dikerjakan TA 2022
- Beton Ready Mix f'c= 25 MPa m³ 13.60 1,328,415.00 Dikerjakan TA 2022
3 Balok Type BA2 (200x200)
- Besi D 13 kg 708.52 17,061.00 Dikerjakan TA 2022

Pek. Standar Gedung M - page 25 of 209


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)
- Besi D10 Sengkang kg 571.85 17,061.00 Dikerjakan TA 2022
- Bekisting m² 833.18 241,946.22 Dikerjakan TA 2022
- Beton Ready Mix f'c= 25 MPa m³ 101.40 1,328,415.00 Dikerjakan TA 2022
4 Plat Topi-Topi (t=80mm)
- Besi P8 Single Layer kg 734.11 17,061.00 Dikerjakan TA 2022
- Bekisting m² 210.00 502,264.00 Dikerjakan TA 2022
- Beton Ready Mix f'c= 25 MPa m³ 8.31 1,328,415.00 Dikerjakan TA 2022
JUMLAH A. LANTAI DASAR 141,766,007.64

B. LANTAI 1
1 Balok Type B1 (400x500)
- Besi D19 kg 3,858.37 17,061.00 65,827,582.74
- Besi D16 kg 858.61 17,061.00 14,648,828.21
- Besi D10 Sengkang kg 1,609.16 17,061.00 27,453,930.40
- Bekisting m² 112.29 241,946.22 27,168,141.29
- Beton Ready Mix f'c= 25 MPa m³ 18.89 1,328,415.00 25,099,234.80
2 Balok Type RB (200x300)
- Besi D13 kg 945.26 17,061.00 Dikerjakan TA 2022
- Besi D10 Sengkang kg 967.94 17,061.00 Dikerjakan TA 2022
- Bekisting m² 95.26 241,946.22 Dikerjakan TA 2022
- Beton Ready Mix f'c= 25 MPa m³ 10.34 1,328,415.00 Dikerjakan TA 2022
3 Balok Type BA1 (300x400)
- Besi D 19 kg 785.58 17,061.00 13,402,836.32
- Besi D 16 kg 95.96 17,061.00 1,637,221.98
- Besi D10 Sengkang kg 225.70 17,061.00 3,850,703.00
- Bekisting m² 18.82 294,217.00 5,535,987.07
- Beton Ready Mix f'c= 25 MPa m³ 2.55 1,328,415.00 3,383,405.62
4 Plat Lantai Type Sa (t=130mm)
- Wiremesh M8 Doble Layer kg 5,931.84 15,331.80 90,945,784.51
- Tulangan Rebar D13 kg 137.54 17,061.00 2,346,522.14
- Bekisting Steel Deck m² 420.00 185,278.50 77,816,970.00
- Beton Ready Mix f'c= 25 MPa m³ 54.60 1,328,415.00 72,531,459.00
5 Kolom Type K1 (500x500)
- Besi D19 kg 2,119.58 17,061.00 36,162,140.41
- Besi D10 Sengkang kg 1,643.78 17,061.00 28,044,494.95
- Besi D13 Joint Sengkang kg 451.12 17,061.00 7,696,592.63
- Bekisting m² 134.40 238,646.22 32,074,052.27
- Beton Ready Mix f'c= 25 MPa m³ 16.26 1,328,415.00 21,604,177.44
6 Kolom Type KP (250x250)
- Besi D13 kg 767.21 17,061.00 Dikerjakan TA 2022
- Besi D10 Sengkang kg 749.00 17,061.00 Dikerjakan TA 2022
- Besi D13 Joint Sengkang kg 276.32 17,061.00 Dikerjakan TA 2022
- Bekisting m² 163.80 238,646.22 Dikerjakan TA 2022
- Beton Ready Mix f'c= 25 MPa m³ 10.01 1,328,415.00 Dikerjakan TA 2022
JUMLAH B. LANTAI 1 557,230,064.81

c. LANTAI DAK ATAP


1 Balok Type B1 (400x500)
- Besi D19 kg 3,858.37 17,061.00 65,827,582.74
- Besi D16 kg 858.61 17,061.00 14,648,828.21
- Besi D10 Sengkang kg 1,609.16 17,061.00 27,453,930.40
- Bekisting m² 112.29 241,946.22 27,168,141.29
- Beton Ready Mix f'c= 25 MPa m³ 18.89 1,328,415.00 25,099,234.80
2 Balok Type BR (200x300)
- Besi D13 kg 945.26 17,061.00 Dikerjakan TA 2022
- Besi D10 Sengkang kg 967.94 17,061.00 Dikerjakan TA 2022
- Bekisting m² 95.26 241,946.22 Dikerjakan TA 2022
- Beton Ready Mix f'c= 25 MPa m³ 10.34 1,328,415.00 Dikerjakan TA 2022
3 Balok Type BA1 (300x400)
- Besi D 19 kg 785.58 17,061.00 13,402,836.32
- Besi D 16 kg 95.96 17,061.00 1,637,221.98
- Besi D10 Sengkang kg 225.70 17,061.00 3,850,703.00
- Bekisting m² 18.82 294,217.00 5,535,987.07
- Beton Ready Mix f'c= 25 MPa m³ 2.55 1,328,415.00 3,383,405.62
4 Plat Lantai Type Sb (t=100mm)
- Besi D10 Dobel Layer kg 3,279.98 17,061.00 55,959,735.54
- Bekisting m² 190.00 502,264.00 95,430,160.00
- Beton Ready Mix f'c= 25 MPa m³ 19.09 1,328,415.00 25,356,738.49
5 Balok Type BD (300x500)
- Besi D 13 kg 3,255.32 17,061.00 Dikerjakan TA 2022
- Bekisting m² 37.44 294,217.00 Dikerjakan TA 2022
- Beton Ready Mix f'c= 25 MPa m³ 4.99 1,328,415.00 Dikerjakan TA 2022
6 Pekerjaan Waterproofing
- Liquid Crystalline Waterproofing m² 420.00 137,500.00 57,750,000.00
JUMLAH c. LANTAI DAK ATAP 422,504,505.47
PEKERJAAN NON STANDAR

I. PEKERJAAN STRUKTUR
I.I. PEKERJAAN PONDASI

Pek. Standar Gedung M - page 26 of 209


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)
1 Pekerjaan Pondasi Bored Pile
- Galian Tanah Dengan Alat Bor m 75.20 92,262.50 6,938,140.00
- Buis Beton Ø 800mm bh 150.40 390,335.00 58,706,384.00
- Besi D19 Kg 2,677.96 17,061.00 45,688,725.79
- Sengkang Spiral Besi D13 Kg 1,271.13 17,061.00 21,686,831.80
- Beton Ready Mix f'c= 25 Mpa m³ 37.80 1,328,415.00 50,213,612.50
- Pasir Urug t.10cm m³ 1.26 303,105.00 380,892.98
- Lantai Kerja t.5cm m³ 0.63 1,058,742.14 665,227.31
JUMLAH I.I. 184,279,814.37
JUMLAH PEKERJAAN 1,686,737,938.29

Pek. Standar Gedung M - page 27 of 209


RENCANA ANGGARAN BIAYA
PEKERJAAN PEMBANGUNAN RUMAH SAKIT REGIONAL
KELAS C KABUPATEN BONE - TAHAP LANJUTAN
BANGUNAN M (SELASAR PENGHUBUNG 2 LANTAI & RAMP)
TAHUN ANGGARAN 2023

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN SATUAN VOLUME
(Rp) (Rp)
1. 2. 3. 4. 5. 6 = (4. X 5.)

III. PEKERJAAN ARSITEK


3.1. PEKERJAAN PASANGAN DAN PELAPIS DINDING
A. LANTAI DASAR
1 Pemasangan Dinding Bata Merah 1/2 Batu ,Campuran 1 SP : 5 PP m² 182.73 148,714.50 27,175,046.73
2 Pemasangan Pelesteran , 1 SP : 5 PP, tebal 15 mm m² 354.22 51,404.10 18,208,206.09
3 Membuat acian semen m² 438.22 54,642.50 23,945,272.42
4 Pemasangan plint homogeneos tile 10 x 60 cm cutting size m' 112.49 50,161.38 5,642,653.07

B. LANTAI SATU
1 Pemasangan Dinding Bata Merah 1/2 Batu ,Campuran 1 SP : 5 PP m² 134.67 148,714.50 20,027,827.86
2 Pemasangan Pelesteran , 1 SP : 5 PP, tebal 15 mm m² 269.35 51,404.10 13,845,488.72
3 Membuat acian semen m² 353.35 54,642.50 19,307,708.81
4 Pemasangan plint homogeneos tile 10 x 60 cm cutting size m' 112.49 50,161.38 5,642,653.07
JUMLAH 3.1.PEKERJAAN PASANGAN DAN PELAPIS DINDING 133,794,856.77

3.2. PEKERJAAN PASANGAN LANTAI


A. LANTAI DASAR
1 Pemasangan lantai homogeneous tiles 60 x 60 cm - Unpolished m² 118.35 378,576.00 44,804,469.60

B. LANTAI SATU
1 Pemasangan lantai homogeneous tiles 60 x 60 cm - Unpolished m² 118.35 378,576.00 44,804,469.60
2 Pemasangan Liquid Crystalline Waterproofing m² 177.30 137,500.00 24,378,200.00
3 Pasangan screed + kawat ayam dak atap m³ 164.47 63,995.91 10,525,406.67
JUMLAH 3.2.PEKERJAAN PASANGAN LANTAI 124,512,545.87

3.3. PEKERJAAN PASANGAN PLAFOND


A. LANTAI DASAR
1 Pemasangan plafond GRC tebal 4 mm m² 150.28 68,593.80 10,308,276.26
2 Pemasangan rangka besi hollow galvanis 40.40mm, modul 60x60cm untuk plafond m² 150.28 185,407.75 27,863,076.67
3 Pemasangan List alumunium profil U 2 cm m' 117.49 57,244.00 6,725,597.56

B. LANTAI SATU
1 Pemasangan plafond GRC tebal 4 mm m² 154.76 68,593.80 10,615,576.49
2 Pemasangan rangka besi hollow galvanis 40.40mm, modul 60x60cm untuk plafond m² 154.76 185,407.75 28,693,703.39
3 Pemasangan List alumunium profil U 2 cm m' 64.13 57,244.00 3,671,057.72
JUMLAH 3.3.PEKERJAAN PASANGAN PLAFOND 87,877,288.09

3.4. PEKERJAAN PENGECATAN


A. LANTAI DASAR
1 Pengecatan dinding Wheathershield Paint m² 411.84 41,983.15 17,290,529.42
2 Pengecatan plafond Wheathershield Paint m² 150.28 49,221.15 7,396,954.42

B. LANTAI SATU
1 Pengecatan dinding Wheathershield Paint m² 179.56 41,983.15 7,538,662.35
2 Pengecatan plafond Wheathershield Paint m² 154.76 49,221.15 7,617,465.17
JUMLAH 3.4.PEKERJAAN PENGECATAN 39,843,611.36
JUMLAH PEKERJAAN 386,028,302.10

Pek. Standart Gedung M1 - page 28 of 208


BOQ
PEKERJAAN PEMBANGUNAN RUMAH SAKIT REGIONAL
KELAS C KABUPATEN BONE - TAHAP LANJUTAN
BANGUNAN M (SELASAR 1 LANTAI)
TAHUN ANGGARAN 2023

HARGA SATUAN JUMLAH HARGA


NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)
1. 2. 3. 4. 5. 6 = (4. X 5.)
PEKERJAAN STANDAR

I. PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bowplank m' 310.00 75,212.50 23,315,875.00
JUMLAH I.PEKERJAAN PERSIAPAN 23,315,875.00

II. PEKERJAAN STRUKTUR


1.1. PEKERJAAN TANAH
1 Galian Tanah m³ 1,191.81 95,823.75 114,203,224.37
2 Urugan Tanah Kembali + Pemadatan m³ 303.30 104,252.50 31,619,783.25
Menggunakan tanah Galian
JUMLAH 1.1.PEKERJAAN TANAH 145,823,007.62

1.2. PEKERJAAN STRUKTUR BAWAH


A. PILE CAP DAN TIE BEAM
1 Pile Cap Type PC1 (1,800x1,800x700)
- Besi D19 Kg 783.45 17,061.00 13,366,382.55
- Besi D16 Kg 416.68 17,061.00 7,108,990.16
- Besi D13 Kg 56.35 17,061.00 961,363.01
- Bekisting Batako m² 20.16 294,217.00 5,931,414.72
- Beton Ready Mix f'c= 25 MPa m³ 8.91 1,328,415.00 11,838,753.94
- Pasir Urug t.10cm m³ 1.30 303,105.00 392,824.08
- Lantai Kerja t.5cm m³ 0.65 1,058,742.14 686,064.91
2 Footplat Type FP (1,500x1,500x400)
- Besi D13 Kg 6,245.44 17,061.00 106,553,437.34
- Bekisting Batako m² 216.00 294,217.00 63,550,872.00
- Beton Ready Mix f'c= 25 MPa m³ 80.20 1,328,415.00 106,544,731.55
- Pasir Urug t.10cm m³ 20.25 303,105.00 6,137,876.25
- Lantai Kerja t.5cm m³ 10.13 1,058,742.14 10,719,764.20
2 Balok Type SL1 (300x500)
- Besi D 22 kg 777.40 17,061.00 13,263,265.16
- Besi D 16 kg 83.97 17,061.00 1,432,569.23
- Besi D10 Sengkang kg 170.87 17,061.00 2,915,165.62
- Bekisting m² 15.54 294,217.00 4,572,132.18
- Beton Ready Mix f'c= 25 MPa m³ 3.02 1,328,415.00 4,009,827.06
- Pasir Urug t.10cm m³ 0.63 303,105.00 190,956.15
- Lantai Kerja t.5cm m³ 0.32 1,058,742.14 333,503.78
3 Balok Type SL2 (200x300)
- Besi D 13 kg 2,220.60 17,061.00 37,885,666.61
- Besi D10 Sengkang kg 2,111.47 17,061.00 36,023,764.19
- Bekisting m² 140.90 294,217.00 41,453,998.43
- Beton Ready Mix f'c= 25 MPa m³ 24.31 1,328,415.00 32,296,616.86
4 Balok Type BA1 (300x400)
- Besi D 19 kg 196.40 17,061.00 3,350,709.08
- Besi D 16 kg 23.99 17,061.00 409,305.49
- Besi D10 Sengkang kg 56.43 17,061.00 962,675.75
- Bekisting m² 4.70 294,217.00 1,383,996.77
- Beton Ready Mix f'c= 25 MPa m³ 0.64 1,328,415.00 845,851.41
5 Plat Lantai Type Sc (t=100mm)
- Besi P8 Single Layer kg 2,792.47 17,061.00 47,642,351.69
- Beton Ready Mix f'c= 25 MPa m³ 50.19 1,328,415.00 66,678,822.75
- Pasir Urug t.10cm m³ 50.55 303,105.00 15,321,957.75
- Lantai Kerja t.5cm m³ 25.28 1,058,742.14 26,759,707.66
JUMLAH A. PILE CAP DAN TIE BEAM 671,525,318.33

1.3. PEKERJAAN STRUKTUR ATAS


A. LANTAI DASAR
1 Kolom Type K1 (500x500)
- Besi D19 kg 593.99 17,061.00 10,134,148.22
- Besi D13 Sengkang kg 471.38 17,061.00 8,042,171.35
- Besi D13 Joint Sengkang kg 112.78 17,061.00 1,924,148.16
- Bekisting m² 38.40 238,646.22 9,164,014.93
- Beton Ready Mix f'c= 25 MPa m³ 4.65 1,328,415.00 6,177,019.25
2 Kolom Type K2 (250x250)
- Besi D13 kg 2,333.13 17,061.00 39,805,548.36
- Besi D10 Sengkang kg 2,321.08 17,061.00 39,599,927.89
- Besi D13 Joint Sengkang kg 637.67 17,061.00 10,879,329.94

Pek. Standar Gedung M - page 29 of 208


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)
- Bekisting m² 513.00 238,646.22 122,425,512.00
- Beton Ready Mix f'c= 25 MPa m³ 31.39 1,328,415.00 41,696,787.98
3 Balok Type BA2 (200x200)
- Besi D 13 kg 751.04 17,061.00 12,813,433.04
- Besi D10 Sengkang kg 777.63 17,061.00 13,267,085.57
- Bekisting m² 77.60 241,946.22 18,775,845.05
- Beton Ready Mix f'c= 25 MPa m³ 73.21 1,328,415.00 97,256,687.28
4 Plat Topi-Topi (t=80mm)
- Besi P8 Single Layer kg 699.15 17,061.00 11,928,259.42
- Bekisting m² 200.00 502,264.00 100,452,800.00
- Beton Ready Mix f'c= 25 MPa m³ 8.00 1,328,415.00 10,627,320.00
JUMLAH A. LANTAI DASAR 554,970,038.44

B. LANTAI DAK ATAP


1 Balok Type B1 (400x500)
- Besi D19 kg 623.78 17,061.00 10,642,380.43
- Besi D16 kg 138.89 17,061.00 2,369,663.39
- Besi D10 Sengkang kg 261.04 17,061.00 4,453,637.60
- Bekisting m² 18.24 241,946.22 4,413,099.09
- Beton Ready Mix f'c= 25 MPa m³ 3.07 1,328,415.00 4,077,689.20
2 Balok Type BR (200x300)
- Besi D13 kg 2,220.60 17,061.00 37,885,666.61
- Besi D10 Sengkang kg 2,273.89 17,061.00 38,794,822.97
- Bekisting m² 223.78 241,946.22 54,141,757.82
- Beton Ready Mix f'c= 25 MPa m³ 24.29 1,328,415.00 32,269,131.25
3 Balok Type BA1 (300x400)
- Besi D 19 kg 196.40 17,061.00 3,350,709.08
- Besi D 16 kg 23.99 17,061.00 409,305.49
- Besi D10 Sengkang kg 56.43 17,061.00 962,675.75
- Bekisting m² 4.70 294,217.00 1,383,996.77
- Beton Ready Mix f'c= 25 MPa m³ 0.64 1,328,415.00 845,851.41
4 Plat Lantai Type Sb (t=100mm)
- Besi D10 Dobel Layer kg 8,726.47 17,061.00 148,882,349.02
- Bekisting m² 505.50 502,264.00 253,894,452.00
- Beton Ready Mix f'c= 25 MPa m³ 49.44 1,328,415.00 65,674,642.31
5 Rangka Atap
- Rangka atap baja ringan m² 90.00 182,757.30 16,448,157.00
6 Pekerjaan Waterproofing
- Liquid Crystalline Waterproofing m² 505.50 137,500.00 69,506,250.00
JUMLAH B. LANTAI DAK ATAP 750,406,237.20
PEKERJAAN NON STANDAR

I. PEKERJAAN STRUKTUR
I.I. PEKERJAAN PONDASI
1 Pekerjaan Pondasi Bored Pile
- Galian Tanah Dengan Alat Bor m 18.80 83,393.20 1,567,792.16
- Buis Beton Ø 800mm bh 37.60 390,335.00 14,676,596.00
- Besi D19 Kg 669.49 17,061.00 11,422,181.45
- Sengkang Spiral Besi D13 Kg 317.78 17,061.00 5,421,707.95
- Beton Ready Mix f'c= 25 Mpa m³ 9.45 1,328,415.00 12,553,403.13
- Pasir Urug t.10cm m³ 0.31 303,105.00 95,223.24
- Lantai Kerja t.5cm m³ 0.16 1,058,742.14 166,306.83
JUMLAH I.I. 45,903,210.75
JUMLAH PEKERJAAN 2,191,943,687.33

Pek. Standar Gedung M - page 30 of 208


RENCANA ANGGARAN BIAYA
PEKERJAAN PEMBANGUNAN RUMAH SAKIT REGIONAL
KELAS C KABUPATEN BONE - TAHAP LANJUTAN
BANGUNAN RUMAH M (SELASAR PENGHUBUNG 1 LANTAI)
TAHUN ANGGARAN 2023

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN SATUAN VOLUME
(Rp) (Rp)
1. 2. 3. 4. 5. 6 = (4. X 5.)

III. PEKERJAAN ARSITEK


3.1. PEKERJAAN PASANGAN DAN PELAPIS DINDING
1 Pemasangan Dinding Bata Merah 1/2 Batu ,Campuran 1 SP : 5 PP m² 220.39 148,714.50 32,774,965.58
2 Pemasangan Pelesteran , 1 SP : 5 PP, tebal 15 mm m² 482.25 51,404.10 24,789,550.12
3 Membuat acian semen m² 1,289.33 54,642.50 70,452,474.08
4 Pemasangan batu andesite m² 163.93 382,453.50 62,695,602.26
JUMLAH 3.1.PEKERJAAN PASANGAN DAN PELAPIS DINDING 190,712,592.03

3.2. PEKERJAAN PASANGAN LANTAI


1 Pemasangan lantai homogeneous tiles 60 x 60 cm - Unpolished m² 443.29 378,576.00 167,818,955.04
2 Waterproofing Membran Sheet dak atap m² 481.70 151,791.68 73,118,050.65
3 Pasangan screed + kawat ayam dak atap m³ 375.88 63,995.91 24,054,781.17
JUMLAH 3.2.PEKERJAAN PASANGAN LANTAI 264,991,786.86

3.3. PEKERJAAN PASANGAN PLAFOND


1 Pemasangan plafond GRC tebal 4 mm m² 565.03 68,593.80 38,757,362.75
2 Pemasangan rangka besi hollow galvanis 40.40mm, modul 60x60cm untuk plafond m² 565.03 185,407.75 104,760,421.84
3 Pemasangan List alumunium profil U 2 cm m' 458.66 57,244.00 26,255,533.04
JUMLAH 3.3.PEKERJAAN PASANGAN PLAFOND 169,773,317.63

3.4. PEKERJAAN PENGECATAN


1 Pengecatan dinding Wheathershield Paint m² 1,421.79 41,983.15 59,691,212.34
2 Pengecatan plafond Wheathershield Paint m² 565.03 49,221.15 27,811,288.57
JUMLAH 3.4.PEKERJAAN PENGECATAN 87,502,500.91

3.5. PEKERJAAN PENUTUP ATAP


1 Atap genteng metal berpasir 3mm dengan insulasi m² 102.01 190,000.00 19,382,679.00
2 Pekerjaan lisplank GRC m' 38.98 39,381.95 1,535,108.51
JUMLAH 3.5.PEKERJAAN PENUTUP ATAP 20,917,787.51
JUMLAH PEKERJAAN 733,897,984.95

Pek. Standart Gedung M2 - page 31 of 208


REKAPITULASI

PROYEK : PEKERJAAN RS REGIONAL KABUPATEN BONE TAHAP LANJUTAN


PEKERJAAN : PENGADAAN INTERIOR GD A B DAN C
LOKASI : RUMAH SAKIT REGIONAL KABUPATEN BONE

KODE HARGA SATUAN


NO ITEM PEKERJAAN INTERIOR VOLUME SATUAN JUMLAH (Rp)
GAMBAR (Rp)

GEDUNG A
LOBBY-ADMISSION-FARMASI Lt. DASAR 1
1 INT1 Pek. Custom Backdrop Farmasi 7.46 m² 1,618,636.33 12,075,027.05
2 INT1 Pek. Custom Backdrop Admission 13.26 m² 1,463,829.17 19,410,374.81
3 INT1 Pek. Custom Cladding Dinding Lobby (3 unit) 8.58 m² 1,090,186.33 28,061,396.06
4 INT1 Pek. Custom Cladding Kolom Lobby (2 unit) 6.96 m² 873,866.90 12,164,227.26
5 INT1 Pek. Custom Meja Counter Admission 8.33 m¹ 2,530,000.00 21,074,900.00
6 INT1 Pek. Custom Meja Counter Farmasi 5.55 m¹ 2,530,000.00 14,041,500.00
SUB TOTAL 106,827,425.18
GEDUNG A
RUANG DIREKTUR Lt.1 1
1 INT2 Pek. Custom Kabinet TV 2.60 m¹ 2,438,173.21 6,339,250.35
2 INT2 Pek. Custom Cladding Kolom (2 unit) 2.32 m² 521,537.50 2,419,934.00
SUB TOTAL 8,759,184.35
GEDUNG A
RUANG RAPAT Lt.1 1
1 INT3 Pek. Custom Backdrop TV 17.98 m² 892,951.93 16,055,275.69
2 INT3 Pek. Custom Cladding Dinding Kiri 7.54 m² 1,411,928.09 10,645,937.83
3 INT3 Pek. Custom Cladding Dinding Kanan 7.25 m² 1,411,928.09 10,236,478.69
4 INT3 Pek. Custom Cladding Dinding Atas Pintu 0.73 m² 1,411,928.09 1,030,707.51
5 INT3 Pek. Custom Cladding Kolom (2 unit) 4.06 m² 911,119.84 7,398,293.07
6 INT3 Pek. Custom Insulasi Dinding Peredam + Wallpaper 29.89 m² 907,146.93 27,114,621.85
SUB TOTAL 72,481,314.65
GEDUNG B
LOBBY -ADMINISTRASI Lt. DASAR 1
1 INT4 Pek. Custom Cladding Dinding A (2 unit) 9.90 m² 1,650,752.23 32,684,894.11
2 INT4 Pek. Custom Cladding Dinding B 11.96 m² 1,096,863.57 13,118,488.24
3 INT4 Pek. Custom Backdrop Administrasi 5.94 m² 919,526.73 5,461,988.76
4 INT4 Pek. Custom Cladding Kolom A (2 unit) 6.96 m² 873,866.90 12,164,227.26
5 INT4 Pek. Custom Cladding Kolom B 2.03 m² 873,866.90 1,773,949.81
6 INT4 Pek. Custom Cladding Garda Lift 5.01 m² 873,866.90 4,378,073.17
7 INT4 Pek. Custom Meja Counter Administrasi 5.28 m¹ 2,530,000.00 13,358,400.00
SUB TOTAL 82,940,021.35
GEDUNG C
LOBBY Lt. DASAR 1
1 INT5 Pek. Custom Cladding Dinding (2 unit) 9.90 m² 1,090,186.33 21,585,689.27
2 INT5 Pek. Custom Backdrop Sekuriti (2 unit) 9.90 m² 1,463,829.17 28,983,817.59
3 INT5 Pek. Custom Meja Counter Sekuriti 2.25 m¹ 2,530,000.00 5,692,500.00
SUB TOTAL 56,262,006.86
GEDUNG C
RAWAT INAP VVIP 1
1 INT6 Pek. Custom Lemari Pakaian VVIP 1.18 m¹ 4,852,531.17 5,701,724.13
2 INT6 Pek. Custom Kredensa VVIP 1.93 m¹ 1,577,090.89 3,035,899.97
3 INT6 Pek. Custom Kabinet Pantry VVIP 2.90 m¹ 6,066,809.07 17,593,746.31
4 INT6 Pek. Custom Backdrop Bedhead Panel VVIP 11.02 m² 1,085,053.84 11,957,293.29
5 INT6 Pek. Custom Cladding Dinding Sudut VVIP 5.94 m² 920,433.27 5,467,373.60
6 INT6 Pek. Custom Backdrop TV VVIP 5.58 m² 919,864.77 5,132,845.40
SUB TOTAL 48,888,882.69
GEDUNG C
RAWAT INAP VIP 4
1 INT6 Pek. Custom Lemari Pakaian VIP 0.50 m¹ 4,594,099.80 9,188,199.60
2 INT6 Pek. Custom Kredensa VIP 2.75 m¹ 1,343,169.80 14,774,867.79
3 INT6 Pek. Custom Kabinet Pantry VIP 1.68 m¹ 2,801,383.74 18,769,271.07
4 INT6 Pek. Custom Backdrop Bedhead Panel VIP 9.57 m² 904,431.17 34,621,625.25
5 INT6 Pek. Custom Cladding Dinding Sudut VIP 3.26 m² 920,433.27 12,002,449.79
6 INT6 Pek. Custom Backdrop TV VIP 7.97 m² 899,865.51 28,687,712.41
SUB TOTAL 118,044,125.91
TOTAL 494,202,960.99

Pekerjaan Interior - page 32 of 208


BOQ
PEKERJAAN PEMBANGUNAN RUMAH SAKIT REGIONAL
KELAS C KABUPATEN BONE - TAHAP LANJUTAN
PEKERJAAN SITE DEVELOPMENT
TAHUN ANGGARAN 2023

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN SATUAN VOLUME
(Rp) (Rp)
1. 2. 3. 4. 5. 6 = (4. X 5.)

PEKERJAAN SITE DEVELOPMENT

I. PEKERJAAN DINDING PENAHAN TANAH


a. Pekerjaan galian tanah m³ 475.83 95,823.75 45,596,039.19
b. Urugan pasir urug, t = 10 cm m³ 79.31 303,105.00 24,037,860.24
c. Pasangan batu kali m³ 505.47 1,024,375.00 517,790,831.25
JUMLAH I.PEKERJAAN DINDING PENAHAN TANAH 587,424,730.68

II. PEKERJAAN JALAN DAN PARKIR


a. Lapis Fondasi Agregat Kelas A tebal 15 cm termasuk pemadatan m³ 249.04 295,031.79 73,474,369.65
c. Plastik cor m² 1,660.26 12,500.00 20,753,235.53
d. Beton Ready mix f'c= 25 Mpa m³ 415.06 1,328,415.00 551,378,187.53
e. Kanstein 60 x 15 x 30 cm m' 3,426.00 295,603.43 1,012,737,352.46
JUMLAH II.PEKERJAAN JALAN DAN PARKIR 1,658,343,145.18

III. PEKERJAAN SALURAN KELILING & KOLAM RETENSI


1 Saluran U ditch 30 x 40 cm
- Saluran U dict 30 x 40 cm m' 600.18 327,855.00 Dikerjakan TA 2022
- Galian tanah m³ 90.03 95,823.75 Dikerjakan TA 2022
- Urugan pasir urug, t = 10 cm m³ 18.01 303,105.00 Dikerjakan TA 2022
- Gril besi stainless steel lebar 30 cm m' 110.39 407,962.50 45,034,980.38
2 Saluran U ditch 40 x 60 cm
- Saluran U dict 40 x 60 cm m' 388.39 486,805.00 189,072,335.89
- Galian tanah m³ 135.94 95,823.75 13,026,092.76
- Urugan pasir urug, t = 10 cm m³ 15.54 303,105.00 4,708,971.38
- Gril besi stainless steel lebar 40 cm m' 137.48 473,962.50 65,159,558.76
3 Bak Kontrol 60 x 80 x 100 cm
- Galian tanah m³ 18.90 95,823.75 1,811,068.88
- Urugan pasir urug, t = 10 cm m³ 1.64 303,105.00 496,485.99
- Lantai kerja, t = 5 cm m³ 0.88 1,058,742.14 933,810.57
- Pasangan dinding bata ringan uk. 200 x 600 x 100 mm m² 72.80 206,556.09 15,037,283.47
- Pasangan plesteran semen instan tebal 1 cm m² 36.40 64,017.71 2,330,244.58
- Membuat acian semen instan m² 36.40 39,050.00 1,421,420.00
- Plat penutup beton tebal 10 cm m³ 0.39 4,686,751.50 1,827,833.09
4 Sumur Resapan ukuran Ø 120 cm kedalaman 300 cm
- Galian tanah m³ 58.50 95,823.75 5,605,689.38
- Buis beton ukuran Ø 120, tinggi 50 cm bh 90.00 419,017.50 37,711,575.00
- Ijuk tebal 24 cm m² 16.96 1,039,995.00 17,634,155.22
- Gravel m³ 10.17 256,361.11 2,608,115.40
- Plat beton penutup bak kontrol tebal 10 cm m³ 1.70 4,686,751.50 7,946,855.84
- Pipa PVC Ø 4", dari saluran ke sumur resapan m' 104.26 135,000.00 14,074,438.50
5 Kolam retensi ukuran 3 x 3 x 0,8 m
- Galian tanah m³ 9.00 95,823.75 862,413.75
- Urugan pasir urug, t = 10 cm m³ 0.90 303,105.00 272,794.50
- Lantai kerja, t = 5 cm m³ 0.45 1,058,742.14 476,433.96
- Cor beton plat tebal 7cm mutu K-225 m3 0.63 1,341,667.64 845,250.62
- Pasangan dinding bata ringan uk. 200 x 600 x 100 mm m² 9.60 206,556.09 1,982,938.48
- Pasangan plesteran semen instan tebal 1 cm m² 11.40 64,017.71 729,801.88
- Membuat acian semen instan m² 14.70 39,050.00 574,035.00
- Pemasangan Kolom praktis 11/11 cm m' 4.00 105,924.50 423,698.00
- Pemasangan Balok praktis 10/15 cm m' 12.00 140,719.70 1,688,636.40

JUMLAH III.PEKERJAAN SALURAN KELILING & KOLAM RETENSI 434,296,917.67

IV. PEKERJAAN PAGAR


4.1. PEKERJAAN PAGAR DEPAN
A. Pas. Kolom Dimensi 30 x 30 cm, Tinggi 1.25 m
1 Besi Tulangan 8 D-12 kg 681.80 17,061.00 11,632,184.34
2 Besi Sengkang Dia. 8 mm kg 212.12 17,061.00 3,618,901.79
3 Cor Beton K. 225 m3 6.91 1,341,667.64 9,273,606.75
4 Bekisting m2 92.16 238,646.22 21,993,635.84
B. Pas. Pagar Besi Pembatas (Area Depan)
1 Pasangan Pagar Besi Hollo panjang 2,7 m' tinggi 1 m' set 64.00 1,066,561.72 68,259,950.00
2 Pengecatan Pagar Besi m2 345.60 52,000.00 17,971,200.00
C. Finishing Kolom :
1 Pasangan Batu Andersite m2 85.56 382,453.50 32,722,721.46
2 Pengecatan Pagar Besi m2 172.11 41,109.75 7,075,481.29
3 Pengecatan List Profil m2 84.48 41,983.15 3,546,736.51

Pek. Site Development Utilitas - page 33 of 208


HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN SATUAN VOLUME
(Rp) (Rp)
4 List Profil lebar 5 cm (ban-banan dari plester + acian) m' 563.20 17,500.00 9,856,000.00
5 Ornamen Puncak Pilar berbentuk atap rumah unit 64.00 435,762.41 27,888,793.93
D. Elektrikal :
1 Kabel NYY 3 x 2,5 mm2 Cover Pipa Conduit HI m' 862.95 44,000.00 37,970,007.24
2 Lampu LED SL 6 Watt bh 64.00 120,000.00 7,680,000.00
3 Fitting LED BULB bh 64.00 35,000.00 2,240,000.00
JUMLAH 4.1.PEKERJAAN PAGAR DEPAN 261,729,219.15

4.2. PEKERJAAN PAGAR SAMPING


A. PEKERJAAN GALIAN DAN URUGAN
1 Galian tanah m³ 79.65 95,823.75 7,632,337.44
2 Urugan pasir urug dibawah pondasi t = 10 cm m³ 16.83 303,105.00 5,101,863.36
3 Lantai Kerja t = 5 cm m³ 13.15 1,058,742.14 13,922,459.18
4 Urugan kembali m³ 13.47 58,327.50 785,414.78
B. PEKERJAAN PONDASI
1 Pondasi Strauss Pile Dia. 30 cm
- Pengeboran Tanah utk pondasi m' 526.00 30,244.50 15,908,607.00
- Cor beton Site Mix Mutu K-225 m³ 37.16 1,341,667.64 49,858,918.78
- Besi 4 d10 kg 1,686.25 17,061.00 28,769,124.90
- Besi Spiral d8 - 150 kg 1,368.51 17,061.00 23,348,136.56
2 Pekerjaan Pile Cap, uk. 60 x 60 cm
- Cor beton Site Mix Mutu K-225 m³ 37.84 1,341,667.64 50,764,913.45
- Besi d12 - 150 kg 4,162.09 17,061.00 71,009,404.77
- Bekisting Batako m² 252.25 294,217.00 74,215,600.86
3 Sloof 15 x 250 cm
- Cor beton Site Mix Mutu K-225 m³ 81.80 1,341,667.64 109,747,641.73
- Besi 6 - d10 kg 221.89 17,061.00 3,785,650.28
- Besi sengkang d8 - 200 mm kg 159.81 17,061.00 2,726,501.24
- Bekisting Sloof m² 654.40 241,946.22 158,328,494.87
4 Kolom Struktur 30 x 30 cm
- Cor beton Site Mix Mutu K-225 m³ 23.67 1,341,667.64 31,757,273.11
- Besi 8 - d12 kg 2,614.99 17,061.00 44,614,273.69
- Besi sengkang d8 - 150 mm kg 871.66 17,061.00 14,871,424.56
- Bekisting kolom m² 315.60 238,646.22 75,316,747.73
5 Pekerjaan Dinding Penahan Tanah
- Pasir Urug Bawah Pondasi t.10 cm m³ 29.80 303,105.00 9,031,232.92
- Pondasi Batu Kali 1 PC : 4 PP m³ 386.04 1,024,375.00 395,450,134.22
C. PEKERJAAN PAGAR PRECAST
1 Panel Beton Pracetak Untuk Pagar m² 654.40 580,305.00 379,748,922.60
(panel Precast uk. 240.40.5 cm dan kolom H-Beam)
2 Besi besi siku 40.40.4 kg 1,690.04 40,953.00 69,212,126.21
3 Pekerjaan kawat duri 10 lajur m' 6,543.95 5,555.00 36,351,664.47
JUMLAH 4.2.PEKERJAAN PAGAR SAMPING 1,672,258,868.71

4.3. PEKERJAAN RAILING PAGAR DAN FINISHING LANTAI PLAZA


Pekerjaan Railing Pagar area Plaza Mesjid
1 Pekerjaan pasangan railing pagar stainless dia. 2" m² 18.32 896,362.50 16,422,078.09
- Handrail Stainless Steel dia. 80 mm w/.satin polished finish
- 2 x (10 x 80) Stainless Steel Plate Railing w/. Black Matt Paint Finished
- Pipa BSP dia 1" w/. Synthetic Enamel Paint Finished
2 Pekerjaan Pelapis Lantai Area Tangga Luar Masjid m² 175.31 284,093.02 49,805,482.89
- Batu Andesite, uk. 20 x 20 cm
- Kerikil (Batu Sikat)
- Homogeneous Tile uk. 10 x 10 cm cutting
JUMLAH 4.3.PEKERJAAN RAILING PAGAR DAN FINISHING LANTAI PLAZA 66,227,560.98

V. PEKERJAAN POS JAGA DAN SIGNAGE


5.1. PEKERJAAN POS JAGA 1
A. PEKERJAAN GALIAN DAN URUGAN
1 Galian tanah m³ 9.92 95,823.75 950,571.60
2 Buangan Tanah Bekas Galian m³ 6.94 39,625.07 275,156.46
3 Urugan pasir urug dibawah pondasi t = 10 cm m³ 0.56 303,105.00 169,132.59
4 Lantai Kerja t = 5 cm m³ 0.32 1,058,742.14 341,973.71
5 Pas. Batu Kosong m³ 1.67 590,779.20 988,964.38
6 Urugan kembali m³ 2.98 58,327.50 173,582.64
JUMLAH A.PEKERJAAN GALIAN DAN URUGAN 2,899,381.38
B. PEKERJAAN STRUKTUR
1 Pondasi Batu Kali m³ 6.82 1,024,375.00 6,986,237.50
2 Sloof 15 x 250 cm
- Cor beton Site Mix Mutu K-225 m³ 0.37 1,341,667.64 499,100.36
- Besi 6 - d10 kg 122.31 17,061.00 2,086,792.33
- Besi sengkang d8 - 200 mm kg 18.35 17,061.00 313,018.85
- Bekisting Sloof m² 4.96 241,946.22 1,200,053.26
3 Kolom Struktur
A. Kolom Struktur 30 x 30 cm
- Cor beton Site Mix Mutu K-225 m³ 1.24 1,341,667.64 1,666,351.21
- Besi 8 - d10 kg 71.02 17,061.00 1,211,685.87
- Besi sengkang d8 - 150 mm kg 38.11 17,061.00 650,271.42
- Bekisting kolom m² 16.56 238,646.22 3,951,981.44
B. Kolom Struktur 20 x 20 cm
- Cor beton Site Mix Mutu K-225 m³ 0.18 1,341,667.64 246,866.85
- Besi 8 - d10 kg 34.52 17,061.00 589,013.96
- Besi sengkang d8 - 150 mm kg 10.28 17,061.00 175,470.06
- Bekisting kolom m² 3.68 238,646.22 878,218.10
4 Pekerjaan Balok uk. 15 x 29 cm
- Cor beton Site Mix Mutu K-225 m³ 0.64 1,341,667.64 853,300.62
- Besi 8 - d10 kg 52.28 17,061.00 891,935.43

Pek. Site Development Utilitas - page 34 of 208


HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN SATUAN VOLUME
(Rp) (Rp)
- Besi sengkang d8 - 150 mm kg 41.82 17,061.00 713,548.34
- Bekisting kolom m² 8.48 241,946.22 2,051,703.96
JUMLAH B.PEKERJAAN STRUKTUR 24,965,549.58
C. PEKERJAAN ARSITEKTUR
1 PEKERJAAN PASANGAN DAN PELAPIS DINDING
a. Pemasangan Dinding Bata Merah 1/2 Batu ,Campuran 1 SP : 5 PP m² 23.46 148,714.50 3,488,842.17
b. Pemasangan Pelesteran , 1 SP : 5 PP, tebal 15 mm m² 46.92 51,404.10 2,411,880.37
c. Membuat acian semen m² 46.92 54,642.50 2,563,826.10
d. Opening pintu & jendela m' 32.35 24,164.73 781,728.97
e. Meja beton tebal 10 cm - Besi d8-150 m³
-Besi d8-150 kg 29.76 17,061.00 507,685.23
-Cor beton Site Mix Mutu K-175 m³ 0.09 1,276,885.50 114,919.70
-Pemasangan bekisting untuk plat lantai 2 kali pakai m³ 0.69 502,264.00 346,562.16
f. Pasangan dinding homogeneous tiles uk. 30 x 60 cm m² 10.86 371,701.00 4,036,672.86
g. Pemasangan plint homogeneous tile 10 x 60 cm cutting size m' 7.67 50,161.38 384,737.75
h. Pemasangan batu andesite m² 14.00 382,453.50 5,353,870.93
2 PEKERJAAN PASANGAN LANTAI
a. Pemasangan lantai homogeneous tiles 60 x 60 cm - Polished m² 4.40 384,351.00 1,691,144.40
b. Pasangan Lantai Keramik uk. 60 x 60 cm (kasar) m² 1.89 309,276.00 584,531.64
c. Rabat Beton tebal 10 cm m³ 0.07 1,276,885.50 85,551.33
d. Pasangan Granite untuk pelapis meja beton m² 1.39 1,518,439.67 2,110,631.14
3 PEKERJAAN PASANGAN PLAFOND
a. Pemasangan Langit-langit ( Plafond ) Gypsum board , tebal 9mm m² 4.40 67,793.00 298,289.20
b. Pemasangan plafond GRC tebal 4 mm m² 18.95 68,593.80 1,299,852.51
c. Pemasangan list profil gypsum m' 13.07 29,127.34 380,694.39
4 PEKERJAAN SANITAIR
a. Kloset jongkok lengkap dengan aksesoris unit 1.00 952,624.98 952,624.98
b. Tisue holder bh 1.00 586,632.75 586,632.75
c. Floor drain bh 1.00 374,819.50 374,819.50
d. Pemasangan kran dinding Ø 1/2" bh 1.00 304,438.75 304,438.75
5 PEKERJAAN PENGECATAN
a. Pengecatan dinding emultion paint m² 12.73 33,260.15 423,501.49
b. Pengecatan dinding Wheathershield Paint m² 21.95 41,983.15 921,530.14
c. Pengecatan Plafond Emultion Paint m² 5.62 40,498.15 227,599.60
d. Pengecatan plafond Wheathershield Paint m² 17.73 49,221.15 872,690.99
e. Pengecatan List Plafond Emulsion Paint m' 13.07 3,620.82 47,324.05
6 PEKERJAAN PASANGAN PINTU DAN JENDELA
PINTU TYPE
a. Pemasangan Pintu type A Uk. 900x2150 mm + Bouvenlight +2850 AFFL unit 1.00 4,554,768.53 4,554,768.53
b. Pemasangan Pintu type C Uk. 750 x 2150 mm + Bouvenlight +2850 AFFL unit 1.00 3,667,675.11 3,667,675.11
JENDELA TYPE
a. Jendela Type DW1 unit 1.00 2,046,893.36 2,046,893.36
b. Jendela Type W3' unit 1.00 4,594,830.53 4,594,830.53
c. Jendela Type W3 unit 1.00 4,873,395.16 4,873,395.16
d. Bouvenlight Type BV1 unit 1.00 1,128,937.99 1,128,937.99
7 PEKERJAAN PENUTUP ATAP
a. Atap Genteng Metal m² 24.70 255,645.50 6,314,443.85
b. Pekerjaan lisplank GRC m' 20.60 39,381.95 811,268.22
c. Pekerjaan Water Proofing Membrant m' 2.16 151,791.68 327,870.02
d. Pekerjaan Ornamen pada Puncak Atap Unit 2.00 55,000.00 110,000.00
e. Pagar Hollow 40 x 40 mm, fin. Enamel paint m² 4.80 450,000.00 2,160,000.00
- Pagar Hollow 40 x 40 mm
- Pengecat Enamel Paint 5.63
JUMLAH C.PEKERJAAN ARSITEKTUR 61,742,665.86
D. PEKERJAAN MEKANIKAL DAN PLUMBING
1 PEKERJAAN AIR BERSIH
a. Gate Valve :
- Diameter 32 mm bh 1.00 1,329,000.00 1,329,000.00
- Diameter 40 mm bh 1.00 1,623,000.00 1,623,000.00
b. Pemipaan Polypropelyne PN.10 :
- Diameter 40 mm (1 1/2") m¹ 30.00 91,000.00 2,730,000.00
- Diameter 32 mm (1 1/4") m¹ 81.00 63,000.00 5,103,000.00
- Diameter 25 mm (1") m¹ 7.00 43,000.00 301,000.00
- Diameter 20 mm (3/4") m¹ 1.00 30,000.00 30,000.00
2 PEKERJAAN AIR KOTOR
a. Pemipaan Air kotor padat PVC Kelas 10 kg/cm2 :
- PVC diameter 100 mm m¹ 11.25 135,000.00 1,518,750.00
b. Pemipaan Air kotor cair PVC Kelas 10 kg/cm2 :
- PVC Diameter 65 mm m¹ 5.00 66,000.00 330,000.00
- FCO diameter 65 mm bh 1.00 246,000.00 246,000.00
- Floor Drain bh 1.00 384,000.00 384,000.00
c. Pembuatan IPAL Biotech Kap. 1200 Ltr unit 1.00 6,771,000.00 6,771,000.00
JUMLAH D.PEKERJAAN MEKANIKAL DAN PLUMBING 20,365,750.00
E. PEKERJAAN ELEKTRIKAL
1 PEKERJAAN LAMPU PENERANGAN, SAKLAR, STOP KONTAK DAN INSTALASI
a. Fixtures lampu lengkap dengan armature
- Lampu Down Light Led 12 W (Recessed Mounted) bh 1.00 173,000.00 173,000.00
- Down Light Led 6 W (Surface Mounted) bh 4.00 140,000.00 560,000.00
b. Pekerjaan Saklar Lampu
- Saklar Ganda bh 1.00 72,000.00 72,000.00
- Saklar Tunggal bh 1.00 55,000.00 55,000.00
c. Pekerjaan Stop Kontak
- Stop Kontak 200 W / 16 A bh 3.00 83,000.00 249,000.00
d. Titik instalasi
- Titik Instalasi Penerangan ttk 7.00 310,000.00 2,170,000.00

Pek. Site Development Utilitas - page 35 of 208


HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN SATUAN VOLUME
(Rp) (Rp)
- Titik Instalasi Stop Kontak 1 Phase ttk 3.00 458,000.00 1,374,000.00
JUMLAH E.PEKERJAAN ELEKTRIKAL 4,653,000.00

5.2. PEKERJAAN POS JAGA 2


A. PEKERJAAN GALIAN DAN URUGAN
1 Galian tanah m³ 9.92 95,823.75 950,571.60
2 Buangan Tanah Bekas Galian m³ 6.94 39,625.07 275,156.46
3 Urugan pasir urug dibawah pondasi t = 10 cm m³ 0.56 303,105.00 169,132.59
4 Lantai Kerja t = 5 cm m³ 0.32 1,058,742.14 341,973.71
5 Pas. Batu Kosong m³ 1.67 590,779.20 988,964.38
6 Urugan kembali m³ 2.98 58,327.50 173,582.64
JUMLAH A.PEKERJAAN GALIAN DAN URUGAN 2,899,381.38
B. PEKERJAAN STRUKTUR
1 Pondasi Batu Kali m³ 6.82 1,024,375.00 6,986,237.50
2 Sloof 15 x 250 cm
- Cor beton Site Mix Mutu K-225 m³ 0.37 1,341,667.64 499,100.36
- Besi 6 - d10 kg 122.31 17,061.00 2,086,792.33
- Besi sengkang d8 - 200 mm kg 18.35 17,061.00 313,018.85
- Bekisting Sloof m² 4.96 241,946.22 1,200,053.26
3 Kolom Struktur
A. Kolom Struktur 30 x 30 cm
- Cor beton Site Mix Mutu K-225 m³ 1.24 1,341,667.64 1,666,351.21
- Besi 8 - d10 kg 71.02 17,061.00 1,211,685.87
- Besi sengkang d8 - 150 mm kg 38.11 17,061.00 650,271.42
- Bekisting kolom m² 16.56 238,646.22 3,951,981.44
B. Kolom Struktur 20 x 20 cm
- Cor beton Site Mix Mutu K-225 m³ 0.18 1,341,667.64 246,866.85
- Besi 8 - d10 kg 34.52 17,061.00 589,013.96
- Besi sengkang d8 - 150 mm kg 10.28 17,061.00 175,470.06
- Bekisting kolom m² 3.68 238,646.22 878,218.10
4 Pekerjaan Balok uk. 15 x 29 cm
- Cor beton Site Mix Mutu K-225 m³ 0.64 1,341,667.64 853,300.62
- Besi 8 - d10 kg 52.28 17,061.00 891,935.43
- Besi sengkang d8 - 150 mm kg 41.82 17,061.00 713,548.34
- Bekisting kolom m² 8.48 241,946.22 2,051,703.96
JUMLAH B.PEKERJAAN STRUKTUR 24,965,549.58
C. PEKERJAAN ARSITEKTUR
1 PEKERJAAN PASANGAN DAN PELAPIS DINDING
a. Pemasangan Dinding Bata Merah 1/2 Batu ,Campuran 1 SP : 5 PP m² 23.46 148,714.50 3,488,842.17
b. Pemasangan Pelesteran , 1 SP : 5 PP, tebal 15 mm m² 46.92 51,404.10 2,411,880.37
c. Membuat acian semen m² 46.92 54,642.50 2,563,826.10
d. Opening pintu & jendela m' 32.35 24,164.73 781,728.97
e. Meja beton tebal 10 cm - Besi d8-150 m³ 0.21 4,686,751.50 977,187.69
f. Pasangan dinding homogeneous tiles uk. 30 x 60 cm m² 10.86 371,701.00 4,036,672.86
g. Pemasangan plint homogeneous tile 10 x 60 cm cutting size m' 7.67 50,161.38 384,737.75
h. Pemasangan batu andesite m² 14.00 382,453.50 5,353,870.93
2 PEKERJAAN PASANGAN LANTAI
a. Pemasangan lantai homogeneous tiles 60 x 60 cm - Polished m² 4.40 384,351.00 1,691,144.40
b. Pasangan Lantai Keramik uk. 60 x 60 cm (kasar) m² 1.89 309,276.00 584,531.64
c. Rabat Beton tebal 10 cm m³ 0.07 1,276,885.50 85,551.33
d. Pasangan Granite untuk pelapis meja beton m² 1.39 1,518,439.67 2,110,631.14
3 PEKERJAAN PASANGAN PLAFOND
a. Pemasangan Langit-langit ( Plafond ) Gypsum board , tebal 9mm m² 4.40 67,793.00 298,289.20
b. Pemasangan plafond GRC tebal 4 mm m² 18.95 68,593.80 1,299,852.51
c. Pemasangan list profil gypsum m' 13.07 29,127.34 380,694.39
4 PEKERJAAN SANITAIR
a. Kloset jongkok lengkap dengan aksesoris unit 1.00 952,624.98 952,624.98
b. Tisue holder bh 1.00 586,632.75 586,632.75
c. Floor drain bh 1.00 374,819.50 374,819.50
d. Pemasangan kran dinding Ø 1/2" bh 1.00 304,438.75 304,438.75
5 PEKERJAAN PENGECATAN
a. Pengecatan dinding emultion paint m² 12.73 33,260.15 423,501.49
b. Pengecatan dinding Wheathershield Paint m² 21.95 41,983.15 921,530.14
c. Pengecatan Plafond Emultion Paint m² 5.62 40,498.15 227,599.60
d. Pengecatan plafond Wheathershield Paint m² 17.73 49,221.15 872,690.99
e. Pengecatan List Plafond Emulsion Paint m' 13.07 3,620.82 47,324.05
6 PEKERJAAN PASANGAN PINTU DAN JENDELA
PINTU TYPE
a. Pemasangan Pintu type A Uk. 900x2150 mm + Bouvenlight +2850 AFFL unit 1.00 4,554,768.53 4,554,768.53
b. Pemasangan Pintu type C Uk. 750 x 2150 mm + Bouvenlight +2850 AFFL unit 1.00 3,667,675.11 3,667,675.11
JENDELA TYPE
a. Jendela Type DW1 unit 1.00 2,046,893.36 2,046,893.36
b. Jendela Type W3' unit 1.00 4,594,830.53 4,594,830.53
c. Jendela Type W3 unit 1.00 4,873,395.16 4,873,395.16
d. Bouvenlight Type BV1 unit 1.00 1,128,937.99 1,128,937.99
7 PEKERJAAN PENUTUP ATAP
a. Atap Genteng Metal m² 24.70 255,645.50 6,314,443.85
b. Pekerjaan lisplank GRC m' 20.60 39,381.95 811,268.22
c. Pekerjaan Water Proofing Membrant m' 2.16 151,791.68 327,870.02
d. Pekerjaan Ornamen pada Puncak Atap Unit 2.00 55,000.00 110,000.00
e. Pagar Hollo 40 x 40 mm, fin. Enamel paint m² 4.80 450,000.00 2,160,000.00
JUMLAH C.PEKERJAAN ARSITEKTUR 61,750,686.46
D. PEKERJAAN MEKANIKAL DAN PLUMBING
1 PEKERJAAN AIR BERSIH
a. Gate Valve :

Pek. Site Development Utilitas - page 36 of 208


HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN SATUAN VOLUME
(Rp) (Rp)
- Diameter 32 mm bh 1.00 1,329,000.00 1,329,000.00
- Diameter 40 mm bh 1.00 1,623,000.00 1,623,000.00
b. Pemipaan Polypropelyne PN.10 :
- Diameter 40 mm (1 1/2") m¹ 30.00 91,000.00 2,730,000.00
- Diameter 32 mm (1 1/4") m¹ 81.00 63,000.00 5,103,000.00
- Diameter 25 mm (1") m¹ 7.00 43,000.00 301,000.00
- Diameter 20 mm (3/4") m¹ 1.00 30,000.00 30,000.00
2 PEKERJAAN AIR KOTOR
a. Pemipaan Air kotor padat PVC Kelas 10 kg/cm2 :
- PVC diameter 100 mm m¹ 11.25 135,000.00 1,518,750.00
b. Pemipaan Air kotor cair PVC Kelas 10 kg/cm2 :
- PVC Diameter 65 mm m¹ 5.00 66,000.00 330,000.00
- FCO diameter 65 mm bh 1.00 246,000.00 246,000.00
- Floor Drain bh 1.00 384,000.00 384,000.00
c. Pembuatan IPAL Biotech Kap. 1200 Ltr unit 1.00 6,771,000.00 6,771,000.00
JUMLAH D.PEKERJAAN MEKANIKAL DAN PLUMBING 20,365,750.00
E. PEKERJAAN ELEKTRIKAL
1 PEKERJAAN LAMPU PENERANGAN, SAKLAR, STOP KONTAK DAN INSTALASI
a. Fixtures lampu lengkap dengan armature
- Lampu Down Light Led 12 W (Recessed Mounted) bh 1.00 173,000.00 173,000.00
- Down Light Led 6 W (Surface Mounted) bh 4.00 140,000.00 560,000.00
b. Pekerjaan Saklar Lampu
- Saklar Ganda bh 1.00 72,000.00 72,000.00
- Saklar Tunggal bh 1.00 55,000.00 55,000.00
c. Pekerjaan Stop Kontak
- Stop Kontak 200 W / 16 A bh 3.00 83,000.00 249,000.00
d. Titik instalasi
- Titik Instalasi Penerangan ttk 7.00 310,000.00 2,170,000.00
- Titik Instalasi Stop Kontak 1 Phase ttk 3.00 458,000.00 1,374,000.00
JUMLAH E.PEKERJAAN ELEKTRIKAL 4,653,000.00

5.3. PEKERJAAN SIGNAGE


A. PEKERJAAN STRUKTUR
1 Galian tanah m³ 3.36 95,823.75 321,967.80
2 Buangan Tanah Bekas Galian m³ 2.35 39,625.07 93,198.16
3 Urugan kembali m³ 1.01 58,327.50 58,794.12
4 Pasir Urug bawah pondasi, t = 10 cm m³ 0.08 303,105.00 25,460.82
5 Lantai Kerja t = 5 cm m³ 0.04 1,058,742.14 44,467.17
6 Cerucuk Dolken Kayu Ø 8-10cm-Panjang 4m btg 21.00 25,000.00 525,000.00
7 Pondasi Plat, uk. 15 x 80 cm tebal 20 cm
- Cor beton Site Mix Mutu K-225 m³ 0.17 1,276,885.50 214,516.76
- Besi D.13 - 150 kg 25.53 17,061.00 435,502.20
- Bekisting Pondasi m² 2.66 241,946.22 643,576.95
8 Kolom Pedestal, uk. 15 x 65 cm tinggi 2,6 m (7 unit)
- Cor beton Site Mix Mutu K-225 m³ 1.77 1,276,885.50 2,265,833.32
- Besi D.13 - 150 kg 193.88 17,061.00 3,307,742.90
- Bekisting kolom m² 29.12 238,646.22 6,949,377.99
JUMLAH A.PEKERJAAN STRUKTUR 14,885,438.19
B. PEKERJAAN LAMPU PENERANGAN
1 Pekerjaan Pasangan Signage Box "RSUD REGIONAL LA MAPPAPENNING BONE"
- Signage Box Acrylic 3 mm Putih Susu Tinggi 1,5 m Huruf 30.00 1,050,000.00 31,500,000.00
(Termasuk Rangka dan Instalasi)
- Logo Neon Box Acrylic 3 mm Putih Susu uk. 2 x 2 m + accessories unit 1.00 10,000,000.00 10,000,000.00
(Termasuk Rangka dan Instalasi)
- LED Strip Outdoor Lighting m' 90.00 75,000.00 6,750,000.00
- Instalasi kabel NYFGBY 2x4 mm2 titik 39.00 310,000.00 12,090,000.00
JUMLAH B.PEKERJAAN LAMPU PENERANGAN 60,340,000.00

VI. PEKERJAAN TEMPAT PEMBUANGAN SEMENTARA (TPS)


A. PEKERJAAN GALIAN DAN URUGAN
1 Galian tanah m³ 16.00 95,823.75 1,533,180.00
2 Buangan Tanah Bekas Galian m³ 11.20 39,625.07 443,800.74
3 Urugan pasir urug dibawah pondasi t = 10 cm m³ 0.90 303,105.00 272,794.50
4 Lantai Kerja t = 5 cm m³ 1.48 1,058,742.14 1,567,997.11
5 Pas. Batu Kosong m³ 2.70 590,779.20 1,595,103.84
6 Urugan kembali m³ 4.80 58,327.50 279,972.00
JUMLAH A.PEKERJAAN GALIAN DAN URUGAN 5,692,848.19
B. PEKERJAAN STRUKTUR
1 Pondasi Batu Kali m³ 11.00 1,024,375.00 11,268,125.00
2 Sloof 15 x 250 cm
- Cor beton Site Mix Mutu K-225 m³ 0.60 1,341,667.64 805,000.59
- Besi 6 - D10 kg 197.28 17,061.00 3,365,794.08
- Besi sengkang D8 - 200 mm kg 29.59 17,061.00 504,869.11
- Bekisting Sloof m² 8.00 241,946.22 1,935,569.78
3 Kolom Struktur uk. 30 x 30 cm
- Cor beton Site Mix Mutu K-225 m³ 2.52 1,341,667.64 3,381,002.46
- Besi 8 - d10 kg 142.04 17,061.00 2,423,371.74
- Besi sengkang d8 - 150 mm kg 77.33 17,061.00 1,319,391.28
- Bekisting kolom m² 33.60 238,646.22 8,018,513.07
4 Pekerjaan Balok uk. 15 x 29 cm
- Cor beton Site Mix Mutu K-225 m³ 0.60 1,341,667.64 805,000.59
- Besi 8 - d10 kg 49.32 17,061.00 841,448.52
- Besi sengkang d8 - 150 mm kg 39.46 17,061.00 673,158.82
- Bekisting kolom m² 8.00 241,946.22 1,935,569.78
JUMLAH B.PEKERJAAN STRUKTUR 37,276,814.80
C. PEKERJAAN ARSITEKTUR
1 PEKERJAAN PASANGAN DAN PELAPIS DINDING
a. Pemasangan Dinding Bata Merah 1/2 Batu ,Campuran 1 SP : 5 PP m² 43.78 148,714.50 6,510,720.81

Pek. Site Development Utilitas - page 37 of 208


HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN SATUAN VOLUME
(Rp) (Rp)
b. Pemasangan Pelesteran , 1 SP : 5 PP, tebal 15 mm m² 87.56 51,404.10 4,500,943.00
c. Membuat acian semen m² 87.56 54,642.50 4,784,497.30
d. Opening pintu & jendela m' 30.80 24,164.73 744,273.64
d. Pemasangan batu andesite m² 12.62 382,453.50 4,826,563.17
2 PEKERJAAN PASANGAN LANTAI
a. Pasangan Floor Hardener m² 28.53 384,351.00 10,965,534.03
b. Rabat Beton tebal 10 cm m³ 32.13 1,058,742.14 34,017,385.05
3 PEKERJAAN PASANGAN PLAFOND
a. Pemasangan Plafond Metal Ceiling m² 24.93 771,045.00 19,222,151.85
b. Pemasangan Plafond GRC tebal 4 mm m² 16.57 68,593.80 1,136,599.27
4 PEKERJAAN PENGECATAN
a. Pengecatan dinding emultion paint m² 61.95 33,260.15 2,060,466.29
b. Pengecatan dinding Wheathershield Paint m² 58.01 41,983.15 2,435,442.53
c. Pengecatan plafond Wheathershield Paint m² 16.57 49,221.15 815,594.46
d. Pengecatan plint Int Semi Gloss m' 20.30 3,879.32 78,750.09
5 PEKERJAAN PASANGAN PINTU DAN JENDELA
PINTU TYPE
a. Pemasangan Pintu Besi Type A-HM uk. 1200 x 2150 mm unit 1.00 8,275,877.50 8,275,877.50
JENDELA TYPE
a. Jendela Type LV-1 unit 1.00 1,625,490.23 1,625,490.23
6 PEKERJAAN PENUTUP ATAP
a. Atap Genteng Metal m² 62.58 255,645.50 15,997,784.10
b. Pekerjaan lisplank GRC m' 36.18 39,381.95 1,424,839.04
c. Pekerjaan Ornamen pada Puncak Atap Unit 2.00 -
JUMLAH C.PEKERJAAN ARSITEKTUR 119,422,912.35
D. PEKERJAAN ELEKTRIKAL
1 PEKERJAAN LAMPU PENERANGAN, SAKLAR, STOP KONTAK DAN INSTALASI
a. Fixtures lampu lengkap dengan armature
- Pengadaan & Pemasangan LAMPU TL LED 1X16 W - TKI bh 4.00 216,000.00 864,000.00
b. Pekerjaan Saklar Lampu
- Saklar Ganda bh 1.00 72,000.00 72,000.00
c. Pekerjaan Stop Kontak
- Stop Kontak 200 W / 16 A bh 1.00 83,000.00 83,000.00
d. Titik instalasi
- Titik Instalasi Penerangan ttk 5.00 310,000.00 1,550,000.00
- Titik Instalasi Stop Kontak 1 Phase ttk 1.00 458,000.00 458,000.00
JUMLAH D.PEKERJAAN ELEKTRIKAL 3,027,000.00

VII. PEKERJAAN LANDSCAPE


TOTAL PEKERJAAN LANDSCAPE GROUND AREA
A. PEKERJAAN PERSIAPAN
1 Pekerjaan Media Tanam (Soil Mix : 2 Tanah Subur, 1 Sekam, 1 Pasir, m³ 336.00 329,994.50 110,878,152.00
6kg/m3 Pupuk Kandang)

PEKERJAAN PENANAMAN TANAMAN


POHON
1 Trambesi (Samanea saman) Height : 4,5-5 m, Dia. Trunk : 12-15 cm nos 16.00 911,523.80 14,584,380.80
2 Flamboyan Kuning (Peltophorum pterocarpum) Height : 4-5 m, Dia. Trunk :10-12 cm nos - 361,523.80 -
3 Flamboyan Merah (Delonix Regia) Height : 4-5 m, Dia. Trunk : 12-15 cm nos - 416,523.80 -
4 Pulai Semi-Fosil (Alstonia scholaris) Height :5-6 m, Dia. Trunk : 80-100 cm nos - 2,671,523.80 -
5 Ketapang Kencana (Terminalia mantaly) Height : 4 m, Dia. Trunk : 8-10 cm nos 160.00 471,523.80 75,443,808.00
6 Kelapa (Cocos nucifera) Height : 3,5-4 m, Dia. Trunk : 15-20 cm nos - 471,523.80 -
7 Tabebuia Pink (Tabebuia Rosea) Height : 4 m, Dia. Trunk : 8-10 cm nos - 471,523.80 -
8 Tabebuia Kuning (Tabebuia chrysantha) Height : 4 m, Dia. Trunk : 8-10 cm nos - 361,523.80 -

SEMAK DAN GROUNDCOVER


1 Rumput Bermuda (Cynodon dactylon) - Hydroseeding Method m2 320.00 52,143.30 16,685,856.00
2 Landep (Arachis pintoi) 49 nos/m2 m2 85.00 371,143.30 31,547,180.50
3 Bougenvillea sp Height 30-40 cm, 16nos/m2 m2 79.00 635,143.30 50,176,320.70
4 Soka Merah (Ixora javanica) Height 40 cm, 36 nos/m2 m2 92.00 294,143.30 27,061,183.60
5 Bakung Lele (Hymenocalis littoralis)Height 30 cm, 36nos/m2 m2 85.00 513,802.30 43,673,195.50
6 Heliconia (Heliconia pssitacorum golden torch) Height 40-50 cm, 25 nos/m2 m2 97.00 431,643.30 41,869,400.10
7 Canna (Canna generalis) Height 25-30 cm, 25 nos/m2 m2 82.00 294,143.30 24,119,750.60
LANDSCAPE LIGHTING
1 Armatur Lampu Spot Light Pohon (Ex:BGP150 LED 520/WW 10W 3000 K - 520 Lm pcs 40.00 2,500,000.00 100,000,000.00
2 Instalasi kabel NYFGBY 3x4 mm2 m 250.00 310,000.00 77,500,000.00
WATER TAP
1 Water Tap for Landscaping - TOTO T26-13 Pcs 7.00 325,000.00 2,275,000.00
JUMLAH VII.PEKERJAAN LANDSCAPE 615,814,227.80
JUMLAH PEKERJAAN 5,766,000,397.93

Pek. Site Development Utilitas - page 38 of 208


BOQ
PEKERJAAN PEMBANGUNAN RUMAH SAKIT REGIONAL
KELAS C KABUPATEN BONE - TAHAP LANJUTAN
PEKERJAAN UTILITAS MEP
TAHUN ANGGARAN 2023

HARGA SATUAN JUMLAH HARGA


NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)
1. 2. 3. 4. 5. 6 = (4. X 5.)

I. PEKERJAAN PLAMBING
1.1. PEKERJAAN PERALATAN AIR BERSIH
1 Pekerjaan Pompa Air Recycling ( P Rec.1 & P Rec.2 )
Type : Centrifugal End Suction unit 2.00 76,483,000.00 152,966,000.00
Kapasitas : 2x210 lpm
Putaran ( RPM ) : 1500
Assessories : - Flexible joint dia. 65 mm bh 2.00 4,450,000.00 8,900,000.00
- Flexible joint dia. 50 mm bh 2.00 4,161,000.00 8,322,000.00
- Strainer dia. 65 mm bh 2.00 1,484,000.00 2,968,000.00
- Gate valve diameter 65 mm bh 2.00 1,934,000.00 3,868,000.00
- Gate valve diameter 50 mm bh 6.00 1,769,000.00 10,614,000.00
- Check valve diameter 50 mm bh 2.00 869,000.00 1,738,000.00
- Pressure gauge + ball valve bh 2.00 837,000.00 1,674,000.00
Header bh 1.00 950,000.00 950,000.00
Panel kontrol set 1.00 14,034,000.00 14,034,000.00
Instalasi daya listrik pompa ttk 2.00 936,000.00 1,872,000.00

2 Pekerjaan Roof Tank Air Recycling


- Tanki Air. Kapasitas : 10 M3, tipe Module unit 1.00 40,706,000.00 40,706,000.00
- Floating valve, diameter 40 mm set 2.00 3,303,000.00 6,606,000.00
- Saringan Foot valve, diameter 65 mm bh 2.00 523,000.00 1,046,000.00
- Header diameter 80 mm bh 1.00 950,000.00 950,000.00
- Gate valve diameter 65 mm bh 4.00 1,934,000.00 7,736,000.00
- Pompa Tekan Air Bersih
- Package Booster Pump ( 1 set = 3 Pompa ) set 1.00 62,211,000.00 62,211,000.00
Application : Hydro Multi Booster 3 x CR 5
Flow & Head : 3 x 80 lpm @ 25 meter
Model : Centrifugal Multistage Pump
Type : In Line Pump
Motor : , 3Ph, 380 V, 50 Hz, 2900 RPM
Operation : Parallel Alternate with Variable speed
Accessories - 1 unit Control Panel in steel cabinet
- 2 unit manifold made of Galvanize pipe
- 3 unit non return valve
- 6 unit isolating valve
- Pressure Transmitter
- 1 unit pressure tank
- Power cable motor to control panel
- Galvanized Base frame
- 1 unit pressure gauge

JUMLAH 327,161,000.00

1.2. PEKERJAAN PEMIPAAN SITE


- Pipa supply Air Recycling :
- Pipa Pengisi Roof Tank Air Recycling, PPR, diameter 65 mm m' 125.00 191,000.00 23,875,000.00
- Pipa supply Air Bersih dari Pompa Air Recyclingh/P Rec, PPR diameter 65 mm m' 248.00 191,000.00 47,368,000.00
- Pipa supply dari Roof Tank Air Recycling, PPR diameter 65 mm m' 175.00 191,000.00 33,425,000.00
- Pipa supply dari Roof Tank Air Recycling, PPR diameter 65 mm m' 431.00 191,000.00 82,321,000.00
JUMLAH 1.2.PEKERJAAN PEMIPAAN SITE 186,989,000.00

1.3 PEKERJAAN PERALATAN AIR PANAS ( HEAT PUMP )

1. Heat Pump
- Heat Pump ( HP.1, HP.2 ), kapasitas : 21 kW unit 2.00 3,880,000.00 7,760,000.00
- Accessories valve
Gate valve dia. 32 mm bh 6.00 1,329,000.00 7,974,000.00
Gate valve dia. 25 mm bh 4.00 944,000.00 3,776,000.00
- Instalasi daya listrik HP ttk 2.00 936,000.00 1,872,000.00
2. Pompa Heat Pump
- Pompa HP kapasitas : 3 m3/jam unit 2.00 4,458,000.00 8,916,000.00
- Accessories valve
Flexible Joint dia.32 mm bh 4.00 3,006,000.00 12,024,000.00
Gate valve dia. 32 mm bh 4.00 1,329,000.00 5,316,000.00
Check valve dia. 32 mm bh 2.00 488,000.00 976,000.00
Y-Strainer dia.32 mm bh 2.00 800,000.00 1,600,000.00
- Instalasi daya listrik HP ttk 2.00 936,000.00 1,872,000.00
3. Panel Kontrol & Pengkabelan set 1.00 3,500,000.00 3,500,000.00
4. Pressure Tank
- PT.1 & PT.2, kapasitas : 1000 liter unit 2.00 666,000.00 1,332,000.00
- Accesories valve
Gate valve dia. 32 mm bh 13.00 1,329,000.00 17,277,000.00
5. Pompa Return Sirkulasi
- P.1 1. & P.2 unit 2.00 4,458,000.00 8,916,000.00
- Accesories valve
Flexible Joint dia.32 mm bh 4.00 3,006,000.00 12,024,000.00
Gate valve dia. 32 mm bh 4.00 1,329,000.00 5,316,000.00

Pek. Utilitas MEP - page 39 of 208


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)
Check valve dia. 32 mm bh 2.00 488,000.00 976,000.00
Y-Strainer dia.32 mm bh 2.00 800,000.00 1,600,000.00
- Instalasi daya listrik HP ttk 2.00 936,000.00 1,872,000.00
6. Pipa Header bh 4.00 1,500,000.00 6,000,000.00
7. Pipa Distribusi Supply & Return, Polypropeline PN-20
PPR dia. 65 mm m' 145.00 191,000.00 27,695,000.00
Gate valne diameter 65 mm bh 2.00 1,934,000.00 3,868,000.00
8. Biaya akomodasi, survey & pengiriman ls 1.00 3,000,000.00 3,000,000.00
JUMLAH 1.3PEKERJAAN PERALATAN AIR PANAS ( HEAT PUMP ) 145,462,000.00

II. PEKERJAAN PERALATAN PEMADAM KEBAKARAN HYDRANT


Penawaran pekerjaan termasuk pengadaan dan pemasangan
material di-site, lengkap dan berfungsi dengan baik.

2.1 PEKERJAAN PERALATAN HYDRANT


1. Pompa Kebakaran & Accesories
a. Pompa Hydrant Diesel (DFP) lengkap dengan tangki bahan bakar, panel kontrol Unit 1.00 372,152,000.00 372,152,000.00
Model LS 125-100-305F Grundfos Fire Pump
Tipe : In line split case pump
Capacity : 1000 GPM
Head : 100 m
Daya
Putaran : 3000 rpm
Karakteristik
: 380V / 3Ph / 50Hz
Sistim Operasi
: Start Automatic, Stop Manual
b. Pompa Hydrant Electric (EFP) lengkap panel kontrol Unit 1.00 280,148,000.00 280,148,000.00
Model LS 125-100-305F Grundfos Fire Pump
Tipe : In line split case pump
Capacity : 1000 GPM
Head : 100 m
Daya
Putaran : 3000 rpm
Karakteristik
: 380V / 3Ph / 50Hz
Sistim Operasi
: Start Automatic, Stop Manual
c. Pompa Jockey lengkap panel kontrol Unit 1.00 48,100,000.00 48,100,000.00
Tipe : In Line Centrifugal Pump
Capacity : 50 GPM
Head : 110 m
Daya
Putaran : 3000 rpm
Karakteristik
: 380V / 3Ph / 50Hz
Sistim Operasi
: Start Automatic, Stop Manual
d. Pressure Tank, lengkap pondasi, Safety valve, gate valve, pressure gauge & accesories lainnya
Unit 1.00 2,996,000.00 2,996,000.00
kapasitas : 100 Lt
e. Horn / Buzzer Unit 1.00 300,000.00 300,000.00
f. Electroda Water Level Control Unit 1.00 4,458,000.00 4,458,000.00
g. Foot Valve :
- Diameter 6 " Buah 2.00 1,104,000.00 2,208,000.00
- Diameter 2 " Buah 1.00 523,000.00 523,000.00
h. Flexible Joint 20k :
- Diameter 8 " Buah 2.00 3,636,000.00 7,272,000.00
- Diameter 6 " Buah 2.00 2,293,000.00 4,586,000.00
- Diameter 2 " Buah 1.00 638,000.00 638,000.00
- Diameter 1 1/2 " Buah 1.00 523,000.00 523,000.00
i. Check Valve 16 k:
- Diameter 6 " Buah 2.00 34,627,000.00 69,254,000.00
- Diameter 1 1/2 " Buah 1.00 2,717,000.00 2,717,000.00
j. Gate Valve 16 k :
- Diameter 8 " Buah 2.00 41,047,000.00 82,094,000.00
- Diameter 6 " Buah 8.00 13,305,000.00 106,440,000.00
- Diameter 4 " Buah 1.00 13,987,000.00 13,987,000.00
- Diameter 1 " Buah 10.00 4,244,000.00 42,440,000.00
- Diameter 2 " Buah 1.00 8,809,000.00 8,809,000.00
- Diameter 1 1/2 " Buah 1.00 7,654,000.00 7,654,000.00
k. Pressure Switch Buah 3.00 2,704,000.00 8,112,000.00
l. Pressure gauge + Ball valve Buah 3.00 837,000.00 2,511,000.00
m. Safety Relief Valve :
- Diameter 40 mm Buah 1.00 17,500,000.00 17,500,000.00
n. Alarm Check Valve :
- Diameter 100 mm Buah 1.00 10,250,000.00 10,250,000.00
o. Header Diameter 200 mm Buah 2.00 10,500,000.00 21,000,000.00
p. Main Control Valve ( MCV ) diameter 6 ", lengkap msin stop valve, Alarm stop valve set 1.00 9,493,000.00 9,493,000.00
q. Drain valve, Test valve, Pressure gauge, dll sesuai ganbar detail
r. PRV set Ø 6" lengkap set 1.00 21,390,000.00 21,390,000.00
s. Temper switch, Gate valve, PRV, Pressure gauge
t. Pemipaan GSP Schedule 40 :
- Diameter 8 " Meter 11.00 1,130,000.00 12,430,000.00
- Diameter 6 " Meter 12.00 710,000.00 8,520,000.00
- Diameter 4 " Meter 25.00 435,000.00 10,875,000.00
- Diameter 2 1/2 " Meter 4.00 231,000.00 924,000.00
- Diameter 2 " Meter 2.00 154,000.00 308,000.00
- Diameter 1 1.2 Meter 6.00 121,000.00 726,000.00
- Diameter 1 " Meter 6.00 79,000.00 474,000.00
u. Pipa Gas Buang BSP Sch.40, Diameter 100 mm Meter 20.00 435,000.00 8,700,000.00
v. Instalasi Daya Listrik Pompa Titik 1.00 662,000.00 662,000.00
w. Pekerjaan termasuk pengadaan dan pemasangan peralatan
kabel, konduit, dll di-site lengkap accessories.
- Dari PP-HYDRANT ke Main Electric Pump Meter 15.00 1,935,000.00 29,025,000.00
Kabel FRC 4x150 mm2

Pek. Utilitas MEP - page 40 of 208


HARGA SATUAN JUMLAH HARGA
NO. URAIAN SATUAN VOLUME
(Rp.) (Rp.)
- Dari PP-HYDRANT ke Jokey Pump Meter 18.00 89,000.00 1,602,000.00
Kabel FRC 4x4 mm2
x. Perizinan Dinas Pemadam Kebakaran ls 1.00 7,500,000.00 7,500,000.00
JUMLAH 2.1PEKERJAAN PERALATAN HYDRANT 1,229,301,000.00

2.2 INSTALASI PEMIPAAN UTAMA DI SITE DAN PHILLAR HYDRANT


1. Pemipaan Utama dari ruang Pompa menuju Riser Hydrant Box / FHC Gedung
- BSP Sch.40 diameter 150 mm m' 228.00 710,000.00 161,880,000.00
- BSP Sch.40 diameter 100 mm m' 106.00 435,000.00 46,110,000.00
2. Pemipaan Siamese & Pilar Hydrant
- BSP Sch.40 diameter 150 mm m' 529.00 710,000.00 375,590,000.00
- BSP Sch.40 diameter 100 mm m' 338.00 435,000.00 147,030,000.00
3. Siamese Connection unit 2.00 3,303,000.00 6,606,000.00
4. Phillar Hydrant + Hose Cabinet / OHB unit 9.00 2,120,000.00 19,080,000.00
5. Gate valve diameter 100 mm bh 9.00 13,987,000.00 125,883,000.00
6. Check valve diameter 100 mm bh 2.00 21,556,000.00 43,112,000.00
JUMLAH 2.2INSTALASI PEMIPAAN UTAMA DI SITE DAN PHILLAR HYDRANT 925,291,000.00

III. PEKERJAAN ELEKTRIKAL


3.1. PEKERJAAN DAN PEMASANGAN PERALATAN UTAMA LISTRIK DI POWER HOUSE
A. PUTR
- Panel Harmonic Filter unit 1.00 32,817,000.00 32,817,000.00
- Panel Hydrant ( PP- FH ) unit 1.00 15,288,295.00 15,288,295.00
B. Kabel Feeder Tegangan Rendah di Power House
- Dari LVMDP ke Panel Harmonic, NYY 2 x 4 ( 1c x 150 mm2 ) m' 6.00 2,881,680.69 17,290,084.11
JUMLAH 3.1.PEKERJAAN DAN PEMASANGAN PERALATAN UTAMA LISTRIK DI POWER HOUSE 65,395,379.11

3.2. KABEL FEEDER LISTRIK MENUJU GEDUNG


1 Kabel dari LVMDP ke PP - FH, FRC 4 x 185 mm m' 52.00 2,287,000.00 118,924,000.00
2 Kabel dari SDP - H ( Outdoor ) ke PP/LP-H.2, NYY 4 x 25 mm2 m' 16.00 266,000.00 4,256,000.00
JUMLAH 3.2.KABEL FEEDER LISTRIK MENUJU GEDUNG 123,180,000.00

3.3. PEKERJAAN PENGADAAN & PENERANGAN SITE


1 Lampu Penerangan Jalan ( PJU ) set 23.00 5,247,000.00 120,681,000.00
LED 1 x 50 Watt, 8000lm, dilengkapi Solar Panel,
Battere Solar Panel,
Tinggi Tiang 7 meter
2 Lampu Taman LED 18 Watt set 26.00 4,191,000.00 108,966,000.00
3 Titik Instalasi penerangan luar
d/ kabel NYY 4 x 4 mm2 + NYY 2 x 2,5 m2 ttk 26.00 1,167,000.00 30,342,000.00
4 Titik instalasi peralatan
Dari PP - FH ke Panel kontrol Hydrant,
d/ kabel NYY 4 ( 1 x 150 mm2 ) m' 14.00 1,453,000.00 20,342,000.00
d/ kabel NYY 4 x 6 mm2 m' 14.00 71,000.00 994,000.00
JUMLAH 3.3.PEKERJAAN PENGADAAN & PENERANGAN SITE 281,325,000.00

3.4. PEKERJAAN PENGADAAN PENERANGAN SELASAR


1 Lampu Penerangan, Saklar & Stop kontak
Pengadaan & Pemasangan Fixtures lampu lengkap dengan armature
- LED 1 x 16 Watt Tipe TKI bh 85.00 216,000.00 18,360,000.00
2 Saklar dan Stop kontak
- Saklar ganda bh 8.00 72,000.00 576,000.00
- Saklar tukar bh 2.00 88,000.00 176,000.00
3 Titik instalasi
- Instalasi penerangan, NYM 3 x 2,5 mm2 dalam conduit PVC ttk 85.00 310,000.00 26,350,000.00
JUMLAH 3.4.PEKERJAAN PENGADAAN PENERANGAN SELASAR 45,462,000.00

IV. PEKERJAAN PENGADAAN DAN PEMASANGAN GENERATING SET


Pengadaan dan pemasangan Peralatan Utama Genset, lengkap terpasang dengan alat bantu dan
accessories lain yang diperlukan sesuai dengan gambar perencanaan dan spesifikasi teknis.
Diesel Generator Set Silent Type Kapasitas 1000 kVA (Prime Type), 380/220 V / 50 Hz /
1 unit - 1,331,000.00 By Owner
1500 RPM, Standby Rating. c/w Residential Silencer, Spring Vibration.
2 Tangki Bahan Bakar Mingguan Kapasitas 15.000 liter unit 1.00 666,000.00 666,000.00
3 Pompa Electric / Gear Pump unit 1.00 666,000.00 666,000.00
4 Pompa Manual unit 1.00 119,000.00 119,000.00
5 Panel Pompa Electric termasuk Wiring & Sistem Control unit 1.00 262,000.00 262,000.00
6 Exhaust Attenuator unit 1.00 831,000.00 831,000.00
7 Intake Attenuator unit 1.00 831,000.00 831,000.00
8 Pengadaan dan pemasangan
- Instalasi Pemipaan bahan lot 1.00 356,000.00 356,000.00
- Instalasi Pipa Cerobong Asap/Knalpot ke Area Luar Bangunan lot 1.00 237,000.00 237,000.00
- Pengadaan Solar Pada Saat Serah Terima liter 10,000.00 14,000.00 140,000,000.00
9 SLO (Sertifikat Layak Operasi ) GENSET, PANEL PKG unit - By Vendor Genset
JUMLAH IV.PEKERJAAN PENGADAAN DAN PEMASANGAN GENERATING SET 143,968,000.00

V. PEKERJAAN INSTALASI CCTV DAN TATA SUARA KAWASAN


A. Pekerjaan Instalasi CCTV Kawasan
- CCTV Fixed Bullet Outdoor Camera w/ Housing unit 14.00 4,583,000.00 64,162,000.00
- Tiang Kamera, Bahan Galvanis 3", tinggi 3 meter unit 2.00 218,000.00 436,000.00
- Titik instalasi CCTV Outdoor, Kabel UTP Cat-6 dlm pipa konduit PVC m' 231.00 34,000.00 7,854,000.00
- Titik instalasi CCTV Outdoor Tanam, Kabel UTP Cat-6 dlm pipa konduit PVC m' 202.00 73,000.00 14,746,000.00

B. Pekerjaan Tatasuara Kawasan


- Horn Speaker 15W unit 7.00 389,000.00 2,723,000.00
- Tiang Speaker, Bahan Galvanis 3", tinggi 3 meter unit 2.00 218,000.00 436,000.00
- Titik instalasi Horn Speaker Outdoor, Kabel NYMHY 3 x 2,5 mm2 dlm pipa konduit PVC m' 68.00 19,500.00 1,326,000.00
- Titik instalasi Horn speaker taman, Kabel NYMHY 3 x 2,5 mm2 dlm pipa konduit PVC m' 410.00 19,500.00 7,995,000.00
JUMLAH V.PEKERJAAN INSTALASI CCTV DAN TATA SUARA KAWASAN 99,678,000.00
JUMLAH PEKERJAAN 3,573,212,379.11

Pek. Utilitas MEP - page 41 of 208


HARGA BAHAN DAN UPAH STRUKTUR
PEKERJAAN PEMBANGUNAN RUMAH SAKIT REGIONAL
KELAS C KABUPATEN BONE - TAHAP LANJUTAN
TAHUN ANGGARAN 2023

NO URAIAN HARGA SATUAN


A. DAFTAR UPAH
1 Pekerja Rp 136,000 oh
2 Tukang kayu Rp 145,000 oh
3 Tukang batu Rp 145,000 oh
4 Tukang besi Rp 145,000 oh
5 Kepala tukang Rp 155,000 oh
6 Mandor Rp 155,000 oh

B. BAHAN PASANGAN DAN BESI


1 Batu Split 1/2 Rp 325,000 kg
2 Batako Rp 4,500 bh
3 Buis Beton Ø800mm; t=50mm; p=500mm Rp 325,000 bh
4 Beton Ready Mix f'c= 25 Mpa Rp 1,050,000 m³
5 Besi Beton BJTP 280 Rp 12,500 kg
6 Besi Beton BJTS 420 Rp 12,500 kg
7 Besi baja konstruksi Rp 16,500 kg
8 Baja Ringan C75 - 0,75 panjang 6m Rp 140,000 btg
9 Reng Baja ringan Rp 85,000 btg
10 Steel Floordeck BMT=0,75 Rp 95,000 m2
11 Besi Wiremesh Rp 12,500 kg
12 Semen Rp 1,500 kg
13 Pasir beton Rp 270,000 m³
Rp 200 kg
14 Pasir pasang Rp 200,000 m³
15 Pasir urug Rp 186,000 m³
16 Batu Belah Rp 235,000 m³
17 Split 2/3 cm Rp 295,000 m³
Rp 211 kg
18 Agregat Kasar Rp 219,000 m³
19 Panel beton precast mutu beton K-250 Rp 120,000 lbr
20 Kolom H-Beam mutu beton K-250 Rp 390,000 btg

D. BAHAN KAYU
1 Dolken kayu dia. 8-10/400 cm Rp 25,000 btg
2 Kayu papan begisting kelas IV Rp 2,500,000 m³
3 Kayu 5/7 kelas IV Rp 2,300,000 m³
4 Kayu Kelas III Rp 2,650,000 m³
5 Balok Kayu Kelas II Rp 4,500,000 m³
6 Plywood 9 mm Rp 190,000 lbr
Harga Bahan dan Upah Struktur - 42 of 42
NO URAIAN HARGA SATUAN

J. LAIN - LAIN
1 Air Rp 100 ltr
2 Paku Rp 17,500 kg
3 Minyak bekisiting Rp 65,000 ltr
4 Cat Meni Rp 35,000 Kg
5 Kuas Rp 65,000 bh
6 Kawat beton Rp 16,500 kg
7 Paku biasa Rp 17,500 kg
8 Residu Rp 5,000 ltr
9 Seng Gelombang Rp 60,000 lbr
10 Concrate Pump Rp 5,000,000 hari
11 Baut A 325 Ø13mm Rp 7,500 bh
12 Baut Angkur A 325 Ø16mm Rp 135,000 bh
13 Liquid Crystalline Waterproofing Rp 125,000 m2
14 Kanstein uk. 60 x 15 x 30 cm Rp 120,000 bh
15 Dump truck 3-4 ton Rp 150,000 jam
16 Mesin Bor Pondasi Rp 850,000 jam
17 Ijuk Rp 75,000 Kg

Harga Bahan dan Upah Struktur - 43 of 43


ANALISA HARGA SATUAN PEKERJAAN STRUKTUR
PEKERJAAN PEMBANGUNAN RUMAH SAKIT REGIONAL
KELAS C KABUPATEN BONE - TAHAP LANJUTAN
TAHUN ANGGARAN 2023

NO. Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga


PEKERJAAN PERSIAPAN
1 1 m¹ Pengukuran dan pemasangan bowplank A. 2.2.1.4. Rp 75,212.50
Bahan:
1 Kayu 5/7 m³ 0.0120 Rp 2,300,000.00 Rp 27,600.00
2 Paku biasa kg 0.0200 Rp 17,500.00 Rp 350.00
3 Kayu papan 2/20 m³ 0.0040 Rp 2,500,000.00 Rp 10,000.00
Tenaga Kerja:
1 Pekerja L.01 oh 0.1000 Rp 136,000.00 Rp 13,600.00
2 Tukang kayu L.02 oh 0.1000 Rp 145,000.00 Rp 14,500.00
3 Kepala tukang L.03 oh 0.0100 Rp 155,000.00 Rp 1,550.00
4 Mandor L.04 oh 0.0050 Rp 155,000.00 Rp 775.00
Jumlah harga persatuan pekerjaan Rp 68,375.00
Biaya umum dan Keuntungan 10% Rp 6,837.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 75,212.50
2 1 m' Pagar sementara dari seng gelombang tinggi 2 meter A. 2.2.1.2 Rp 653,757.50
Bahan :
1 Dolken kayu dia. 8-10/400 cm btg 1.2500 Rp 25,000.00 Rp 31,250.00
2 Semen kg 2.5000 Rp 1,500.00 Rp 3,750.00
3 Seng Gelombang lbr 1.2000 Rp 60,000.00 Rp 72,000.00
4 Pasir beton m³ 0.0050 Rp 270,000.00 Rp 1,350.00
5 Koral beton m³ 0.0090 Rp 325,000.00 Rp 2,925.00
6 Kayu 5/7 m³ 0.0720 Rp 2,300,000.00 Rp 165,600.00
7 Paku biasa kg 0.0600 Rp 17,500.00 Rp 1,050.00
8 Meni besi ltr 45.0000 Rp 5,000.00 Rp 225,000.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.2000 Rp 136,000.00 Rp 27,200.00
2 Tukang kayu L.02 oh 0.4000 Rp 145,000.00 Rp 58,000.00
3 Kepala tukang L.03 oh 0.0200 Rp 155,000.00 Rp 3,100.00
4 Mandor L.04 oh 0.0200 Rp 155,000.00 Rp 3,100.00
Jumlah harga persatuan pekerjaan Rp 594,325.00
Biaya umum dan Keuntungan 10% Rp 59,432.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 653,757.50
3 1 m² Pembuatan 1 m2 Kantor Sementara/Rumah Jaga/Gudang Semen
1.1.edan Rp
© Peralatan Lantai Plesteran, Dinding Setengah Tembok 1,086,415.00
Bahan:
1 Dolken kayu dia. 8-10/400 cm btg - Rp 25,000.00 Rp -
2 Kayu m³ 0.1800 Rp 1,250,000.00 Rp 225,000.00
3 Paku biasa kg 0.0800 Rp 17,500.00 Rp 1,400.00
4 Besi strip kg 1.1000 Rp -
5 Semen kg 35.0000 Rp -
6 Pasir pasang m³ 0.1500 Rp -
7 Pasir beton m³ 0.1000 Rp -
8 Koral beton m³ 0.1500 Rp -
9 Bata merah bh - Rp -
10 Seng plat lbr 0.2500 Rp -
11 Jendela nako bh 0.2000 Rp -
12 Kaca polos 3 mm m² - Rp -
13 Kunci tanam bh 0.1500 Rp -
14 Plywood 4 mm lbr 0.0600 Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 2.0000 Rp 136,000.00 Rp 272,000.00
2 Tukang kayu L.02 oh 2.0000 Rp 145,000.00 Rp 290,000.00
3 Tukang batu L.02 oh 1.0000 Rp 145,000.00 Rp 145,000.00
4 Kepala tukang L.03 oh 0.3000 Rp 155,000.00 Rp 46,500.00
5 Mandor L.04 oh 0.0500 Rp 155,000.00 Rp 7,750.00
Jumlah harga persatuan pekerjaan Rp 987,650.00
Biaya umum dan Keuntungan 10% Rp 98,765.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,086,415.00
4 1 m³ Membuang Tanah Keluar Site Rp 39,625.07
Bahan:
1 Dumptruk jam 0.0770 Rp 150,000.00 Rp 11,555.56
2 Alat Bantu ls 1.0000 Rp 1,155.56 Rp 1,155.56
Tenaga Kerja:
1 Pekerja L.01 oh 0.1539 Rp 136,000.00 Rp 20,926.65
2 Mandor L.04 oh 0.0154 Rp 155,000.00 Rp 2,385.02
Jumlah harga persatuan pekerjaan Rp 36,022.79
Keuntungan+Over head Rp 3,602.28
Total = Jumlah+(Keuntungan+Over head) Rp 39,625.07

PEKERJAAN TANAH DAN PONDASI

1 1 m³ Penggalian 1 m3 tanah biasa sedalam s.d. 1 m untuk volume1.7.7.1.1.b


> 2000 m3(a) Rp 95,823.75
Tenaga Kerja:
1 Pekerja L.01 oh 0.5750 Rp 136,000.00 Rp 78,200.00
2 Mandor L.04 oh 0.0575 Rp 155,000.00 Rp 8,912.50
Jumlah harga persatuan pekerjaan Rp 87,112.50
Analisa Harga Satuan Struktur - 44 of ?
NO. Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga
Biaya umum dan Keuntungan 10% Rp 8,711.25
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 95,823.75
2 1 m³ Penggalian 1 m3 Tanah Biasa sedalam > 1 m s.d. 2 m untuk volume1.7.7.1.1.d
200 s.d(a)2000 m3 Rp 112,488.75
Tenaga Kerja:
1 Pekerja L.01 oh 0.6750 Rp 136,000.00 Rp 91,800.00
2 Mandor L.04 oh 0.0675 Rp 155,000.00 Rp 10,462.50
Jumlah harga persatuan pekerjaan Rp 102,262.50
Biaya umum dan Keuntungan 10% Rp 10,226.25
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 112,488.75
3 1 m³ Penggalian 1 m3 Tanah Biasa sedalam > 2 m s.d. 3 m untuk volume1.7.7.1.1.f
200 s.d
(a)2000 m3 Rp 126,654.00
Tenaga Kerja:
1 Pekerja L.01 oh 0.7600 Rp 136,000.00 Rp 103,360.00
2 Mandor L.04 oh 0.0760 Rp 155,000.00 Rp 11,780.00
Jumlah harga persatuan pekerjaan Rp 115,140.00
Biaya umum dan Keuntungan 10% Rp 11,514.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 126,654.00
4 1 m³ Penggalian 1 m3 tanah berbatu > 3 m, setiap tambah dalam 1 1.7.8.2.d
m untuk volume
(a) 200 s.d 2000 m3 (A) (U) Rp 83,393.20
Tenaga Kerja:
1 Pekerja L.01 oh 0.5000 Rp 136,000.00 Rp 68,000.00
2 Mandor L.04 oh 0.0504 Rp 155,000.00 Rp 7,812.00
Jumlah harga persatuan pekerjaan Rp 75,812.00
Biaya umum dan Keuntungan 10% Rp 7,581.20
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 83,393.20
5 1 m³ Timbunan atau urugan kembali tanah biasa/liat berpasir 1.7.14.a (a) Rp 303,105.00
Bahan:
1 Pasir Urug m³ 1.4000 Rp 186,000.00 Rp 260,400.00
Tenaga Kerja:
1 Pekerja L.01 oh 0.1000 Rp 136,000.00 Rp 13,600.00
2 Mandor L.04 oh 0.0100 Rp 155,000.00 Rp 1,550.00
Jumlah harga persatuan pekerjaan Rp 275,550.00
Biaya umum dan Keuntungan 10% Rp 27,555.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 303,105.00
6 1 m³ Beton untuk lantai kerja (bedding) Beton fc' = 7,4 s.d. 9,8 MPa2.2.1.1.a.(a)
(K-100 s.d. K-125) Rp 1,058,742.14
Bahan:
1 Semen kg 227.000 Rp 1,500.00 Rp 340,500.00
2 Pasir beton m³ 0.6207 Rp 270,000.00 Rp 167,592.86
3 Batu Split 1/2 m³ 0.7400 Rp 325,000.00 Rp 240,500.00
4 Air ltr 215.000 Rp - Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 1.2000 Rp 136,000.00 Rp 163,200.00
2 Tukang batu L.02 oh 0.2000 Rp 145,000.00 Rp 29,000.00
3 Kepala tukang L.03 oh 0.0200 Rp 155,000.00 Rp 3,100.00
4 Mandor L.04 oh 0.1200 Rp 155,000.00 Rp 18,600.00
Jumlah harga persatuan pekerjaan Rp 962,492.86
Biaya umum dan Keuntungan 10% Rp 96,249.29
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,058,742.14
7 1 kg Memasang Besi Beton BJTP 28 M.55.c Rp 17,061.00
Bahan:
1 Besi beton BJTP 280 kg 10.5000 Rp 12,500.00 Rp 131,250.00
2 Kawat beton kg 0.1500 Rp 16,500.00 Rp 2,475.00
Tenaga Kerja:
1 Pekerja L.01 oh 0.0700 Rp 136,000.00 Rp 9,520.00
2 Tukang besi L.02 oh 0.0700 Rp 145,000.00 Rp 10,150.00
3 Kepala tukang L.03 oh 0.0070 Rp 155,000.00 Rp 1,085.00
4 Mandor L.04 oh 0.0040 Rp 155,000.00 Rp 620.00
Jumlah pekerjaan per sepuluh kg Rp 155,100.00
Jumlah harga persatuan pekerjaan Rp 15,510.00
Biaya umum dan Keuntungan 10% Rp 1,551.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 17,061.00
8 1 kg Memasang Besi Beton BJTS 420 M.55.c Rp 17,061.00
Bahan:
1 Besi Beton BJTS 420 kg 10.5000 Rp 12,500.00 Rp 131,250.00
2 Kawat beton kg 0.1500 Rp 16,500.00 Rp 2,475.00
Tenaga Kerja:
1 Pekerja L.01 oh 0.0700 Rp 136,000.00 Rp 9,520.00
2 Tukang besi L.02 oh 0.0700 Rp 145,000.00 Rp 10,150.00
3 Kepala tukang L.03 oh 0.0070 Rp 155,000.00 Rp 1,085.00
4 Mandor L.04 oh 0.0040 Rp 155,000.00 Rp 620.00
Jumlah pekerjaan per sepuluh kg Rp 155,100.00
Jumlah harga persatuan pekerjaan Rp 15,510.00
Biaya umum dan Keuntungan 10% Rp 1,551.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 17,061.00
9 1 m² Memasang bekisting untuk kolom (3x Pakai) A.4.1.1.20. Rp 238,646.22
Bahan:
1 Kayu Kelas III m³ 0.0133 Rp 2,650,000.00 Rp 35,333.33
2 Paku 5cm dan 7cm Kg 0.4000 Rp 17,500.00 Rp 7,000.00
3 Balok Kayu kelas II m³ 0.0050 Rp 4,500,000.00 Rp 22,500.00
4 Plywood tebal 9mm lbr 0.1167 Rp 190,000.00 Rp 22,166.67
5 Dolken Kayu Ø 8-10cm-Panjang 4m Btg 0.6667 Rp 25,000.00 Rp 16,666.67
Tenaga Kerja:
1 Pekerja L.01 oh 0.6600 Rp 136,000.00 Rp 89,760.00

Analisa Harga Satuan Struktur - 45 of ?


NO. Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga
2 Tukang kayu L.02 oh 0.3300 Rp 145,000.00 Rp 47,850.00
3 Kepala tukang L.03 oh 0.0330 Rp 155,000.00 Rp 5,115.00
4 Mandor L.04 oh 0.0330 Rp 155,000.00 Rp 5,115.00
Peralatan :

Jumlah harga persatuan pekerjaan Rp 216,951.11


Rp 34,555.56
Rp 182,395.56
Biaya umum dan Keuntungan 10% Rp 21,695.11
Keterangan= 3 x pakai Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 238,646.22
10 1 m² Memasang bekisting untuk balok (3x Pakai) A.4.1.1.21. Rp 241,946.22
Bahan:
1 Kayu Kelas III m³ 0.0133 Rp 2,650,000.00 Rp 35,333.33
2 Paku 5cm dan 7cm Kg 0.4000 Rp 17,500.00 Rp 7,000.00
3 Balok Kayu kelas II m³ 0.0060 Rp 4,500,000.00 Rp 27,000.00
4 Plywood tebal 9mm lbr 0.1167 Rp 190,000.00 Rp 22,166.67
5 Dolken Kayu Ø 8-10cm-Panjang 4m Btg 0.6667 Rp 25,000.00 Rp 16,666.67
Tenaga Kerja:
1 Pekerja L.01 oh 0.6600 Rp 136,000.00 Rp 89,760.00
2 Tukang kayu L.02 oh 0.3300 Rp 145,000.00 Rp 47,850.00
3 Kepala tukang L.03 oh 0.0330 Rp 155,000.00 Rp 5,115.00
4 Mandor L.04 oh 0.0330 Rp 155,000.00 Rp 5,115.00
Peralatan :

Jumlah harga persatuan pekerjaan Rp 219,951.11


Rp 36,055.56
Rp 183,895.56
Biaya umum dan Keuntungan 10% Rp 21,995.11
Keterangan= 3 x pakai Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 241,946.22
11 1 m² Memasang bekisting untuk dinding (3x Pakai) A.4.1.1.23.
Bahan:
1 Kayu Kelas III m³ 0.0100 Rp 2,650,000.00 Rp 26,500.00
2 Paku 5cm dan 7cm Kg 0.4000 Rp 17,500.00 Rp 7,000.00
3 Balok Kayu kelas II m³ 0.0067 Rp 4,500,000.00 Rp 30,000.00
4 Plywood tebal 9mm lbr 0.1167 Rp 190,000.00 Rp 22,166.67
5 Dolken Kayu Ø 8-10cm-Panjang 4m Btg 1.0000 Rp 25,000.00 Rp 25,000.00
6 Penjaga Jarak/Spacer bh 1.3333 Rp 1,250.00 Rp 1,666.67
Tenaga Kerja:
1 Pekerja L.01 oh 0.6600 Rp 136,000.00 Rp 89,760.00
2 Tukang kayu L.02 oh 0.3300 Rp 145,000.00 Rp 47,850.00
3 Kepala tukang L.03 oh 0.0330 Rp 155,000.00 Rp 5,115.00
4 Mandor L.04 oh 0.0330 Rp 155,000.00 Rp 5,115.00
Peralatan :

Jumlah harga persatuan pekerjaan Rp 260,173.33


Rp 37,444.44
Rp 185,284.44
Biaya umum dan Keuntungan 10% Rp 26,017.33
Keterangan= 3 x pakai Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 508,919.56
12 1 m² Memasang bekisting untuk plat lantai (3x Pakai) A.4.1.1.22. Rp 502,264.00
Bahan:
1 Kayu Kelas III m³ 0.0133 Rp 2,650,000.00 Rp 35,333.33
2 Paku 5cm dan 7cm Kg 0.4000 Rp 17,500.00 Rp 7,000.00
3 Balok Kayu kelas II m³ 0.0050 Rp 4,500,000.00 Rp 22,500.00
4 Plywood tebal 9mm lbr 0.1167 Rp 190,000.00 Rp 22,166.67
5 Dolken Kayu Ø 8-10cm-Panjang 4m Btg 2.0000 Rp 25,000.00 Rp 50,000.00
Tenaga Kerja:
1 Pekerja L.01 oh 0.6600 Rp 136,000.00 Rp 89,760.00
2 Tukang kayu L.02 oh 0.3300 Rp 145,000.00 Rp 47,850.00
3 Kepala tukang L.03 oh 0.0330 Rp 155,000.00 Rp 5,115.00
4 Mandor L.04 oh 0.0330 Rp 155,000.00 Rp 5,115.00
Peralatan :

Jumlah harga persatuan pekerjaan Rp 239,173.33


Rp 45,666.67
Rp 193,506.67
Biaya umum dan Keuntungan 10% Rp 23,917.33
Keterangan= 3 x pakai Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 502,264.00
13 1 m² Memasang bekisting untuk tangga A.4.1.1.25. Rp 315,249.00
Bahan:
1 Kayu Kelas III m³ 0.0150 Rp 2,650,000.00 Rp 39,750.00
2 Paku 5cm dan 7cm Kg 0.4000 Rp 17,500.00 Rp 7,000.00
3 Balok Kayu kelas II m³ 0.0075 Rp 4,500,000.00 Rp 33,750.00
4 Plywood tebal 9mm lbr 0.1750 Rp 190,000.00 Rp 33,250.00
5 Dolken Kayu Ø 8-10cm-Panjang 4m Btg 1.0000 Rp 25,000.00 Rp 25,000.00
Tenaga Kerja:
1 Pekerja L.01 oh 0.6600 Rp 136,000.00 Rp 89,760.00
2 Tukang kayu L.02 oh 0.3300 Rp 145,000.00 Rp 47,850.00
3 Kepala tukang L.03 oh 0.0330 Rp 155,000.00 Rp 5,115.00
4 Mandor L.04 oh 0.0330 Rp 155,000.00 Rp 5,115.00
Peralatan :

Analisa Harga Satuan Struktur - 46 of ?


NO. Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga
Jumlah harga persatuan pekerjaan Rp 286,590.00
Biaya umum dan Keuntungan 10% Rp 28,659.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 315,249.00
Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm Tebal Rp 294,217.00
14 1 m² A.4.4.1.9
½ Batu dengan Mortar tipe N,fc’ 5,2 Mpa ( Setara Campuran
1SP : 4PP), bekisting batako uk. 40x10x10
Bahan:
1 Batako uk. 40 x 10 x 10 bh 25.0000 Rp 4,500.00 Rp 112,500.00
2 Semen kg 12.1300 Rp 1,500.00 Rp 18,195.00
3 Pasir pasang m³ 0.3880 Rp 200,000.00 Rp 77,600.00
Tenaga Kerja:
1 Pekerja L.01 oh 0.3000 Rp 136,000.00 Rp 40,800.00
2 Tukang batu L.02 oh 0.1000 Rp 145,000.00 Rp 14,500.00
3 Kepala tukang L.03 oh 0.0100 Rp 155,000.00 Rp 1,550.00
4 Mandor L.04 oh 0.0150 Rp 155,000.00 Rp 2,325.00
Jumlah harga persatuan pekerjaan Rp 267,470.00
Biaya umum dan Keuntungan 10% Rp 26,747.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 294,217.00
15 1 bh Memasang Buis Beton Ø800mm; t=50mm; p=500mm Analisa lapangan Rp 390,335.00
Bahan:
1 Buis Beton Ø800mm; t=50mm; p=500mm K175 bh 1.0000 Rp 325,000.00 Rp 325,000.00
2 Alat Bantu ls 1.0000 Rp 16,250.00 Rp 16,250.00
Tenaga Kerja:
1 Pekerja L.01 oh 0.1000 Rp 136,000.00 Rp 13,600.00
Jumlah harga persatuan pekerjaan Rp 354,850.00
Biaya umum dan Keuntungan 10% Rp 35,485.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 390,335.00
16 1 m³ Pengecoran Beton menggunakan Ready Mixed dan pompa beton
2.2.3.a.(a) Rp 1,328,415.00
Bahan:
1 Ready mix f'c=25 Mpa m³ 1.0200 Rp 1,050,000.00 Rp 1,071,000.00
2 Peralatan (pompa beton, vibrator dll) Sewa Hari 0.0120 Rp 5,000,000.00 Rp 60,000.00
Tenaga Kerja:
1 Pekerja L.01 oh 0.4000 Rp 136,000.00 Rp 54,400.00
2 Tukang batu L.02 oh 0.1000 Rp 145,000.00 Rp 14,500.00
3 Kepala tukang L.03 oh 0.0100 Rp 155,000.00 Rp 1,550.00
4 Mandor L.04 oh 0.0400 Rp 155,000.00 Rp 6,200.00
Jumlah harga persatuan pekerjaan Rp 1,207,650.00
Biaya umum dan Keuntungan 10% Rp 120,765.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,328,415.00
17 1 m³ Beton mutu, f’c = 7,4 MPa (K100) 2.2.1.1.b.(c) Rp 1,163,561.93
Bahan:
1 Semen kg 247.0000 Rp 1,500.00 Rp 370,500.00
2 Pasir Beton kg 869.0000 Rp 200.00 Rp 173,800.00
3 Batu Split 1/2 kg 999.0000 Rp 210.71 Rp 210,503.57
4 Air ltr 215.0000 Rp 100.00 Rp 21,500.00
Tenaga Kerja:
1 Pekerja L.01 oh 1.6500 Rp 136,000.00 Rp 224,400.00
2 Tukang batu L.02 oh 0.2750 Rp 145,000.00 Rp 39,875.00
3 Kepala tukang L.03 oh 0.0280 Rp 155,000.00 Rp 4,340.00
4 Mandor L.04 oh 0.0830 Rp 155,000.00 Rp 12,865.00
Jumlah harga persatuan pekerjaan Rp 1,057,783.57
Biaya umum dan Keuntungan 10% Rp 105,778.36
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,163,561.93
18 1 m³ Beton mutu, f’c = 14,5 MPa (K175) 2.2.1.2.d.(a) Rp 1,276,885.50
Bahan:
1 Semen kg 326.0000 Rp 1,500.00 Rp 489,000.00
2 Pasir Beton kg 760.0000 Rp 200.00 Rp 152,000.00
3 Batu Split 1/2 kg 1,029.0000 Rp 210.71 Rp 216,825.00
4 Air ltr 215.0000 Rp 100.00 Rp 21,500.00
Tenaga Kerja:
1 Pekerja L.01 oh 1.6500 Rp 136,000.00 Rp 224,400.00
2 Tukang batu L.02 oh 0.2750 Rp 145,000.00 Rp 39,875.00
3 Kepala tukang L.03 oh 0.0280 Rp 155,000.00 Rp 4,340.00
4 Mandor L.04 oh 0.0830 Rp 155,000.00 Rp 12,865.00
Jumlah harga persatuan pekerjaan Rp 1,160,805.00
Biaya umum dan Keuntungan 10% Rp 116,080.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,276,885.50
19 1 m³ Beton mutu, f’c = 19,3 MPa (K225) 2.2.1.2.f.(a) Rp 1,341,667.64
Bahan:
1 Semen kg 371.0000 Rp 1,500.00 Rp 556,500.00
2 Pasir Beton kg 698.0000 Rp 200.00 Rp 139,600.00
3 Batu Split 1/2 kg 1,047.0000 Rp 210.71 Rp 220,617.86
4 Air ltr 215.0000 Rp 100.00 Rp 21,500.00
Tenaga Kerja:
1 Pekerja L.01 oh 1.6500 Rp 136,000.00 Rp 224,400.00
2 Tukang batu L.02 oh 0.2750 Rp 145,000.00 Rp 39,875.00
3 Kepala tukang L.03 oh 0.0280 Rp 155,000.00 Rp 4,340.00
4 Mandor L.04 oh 0.0830 Rp 155,000.00 Rp 12,865.00
Jumlah harga persatuan pekerjaan Rp 1,219,697.86
Biaya umum dan Keuntungan 10% Rp 121,969.79
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,341,667.64
20 1 Kg Pembuatan 1 kg Baja Profil A.4.2.1.1. Rp 40,953.00
Analisa Harga Satuan Struktur - 47 of ?
NO. Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga
Bahan:
1 Besi Baja IWF /HB kg 1.1500 Rp 16,500.00 Rp 18,975.00
Tenaga Kerja:
1 Pekerja L.01 oh 0.0600 Rp 136,000.00 Rp 8,160.00
2 Tukang besi L.02 oh 0.0600 Rp 145,000.00 Rp 8,700.00
3 Kepala tukang L.03 oh 0.0060 Rp 155,000.00 Rp 930.00
4 Mandor L.04 oh 0.0030 Rp 155,000.00 Rp 465.00
Jumlah harga persatuan pekerjaan Rp 37,230.00
Biaya umum dan Keuntungan 10% Rp 3,723.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 40,953.00
21 1 m³ Pengurugan Kembali 1 m3 Galian Tanah 1.7.2.a (c) Rp 58,327.50
Tenaga Kerja:
1 Pekerja L.01 oh 0.3500 Rp 136,000.00 Rp 47,600.00
2 Mandor L.04 oh 0.0350 Rp 155,000.00 Rp 5,425.00
Jumlah harga persatuan pekerjaan Rp 53,025.00
Biaya umum dan Keuntungan 10% Rp 5,302.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 58,327.50
22 1 m³ Pemadatan Tanah1 m3 per 20 cm dengan alat Timbris 1.7.2.c (c) Rp 45,925.00
Tenaga Kerja:
1 Pekerja L.01 oh 0.2500 Rp 136,000.00 Rp 34,000.00
2 Mandor L.04 oh 0.0500 Rp 155,000.00 Rp 7,750.00
Jumlah harga persatuan pekerjaan Rp 41,750.00
Biaya umum dan Keuntungan 10% Rp 4,175.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 45,925.00
23 1 m³ Pengurugan 1 m3 dengan Pasir Urug 1.7.2.d (c) Rp 292,105.00
Bahan:
1 Pasir Urug m³ 1.2000 Rp 186,000.00 Rp 223,200.00
Tenaga Kerja:
1 Pekerja L.01 oh 0.3000 Rp 136,000.00 Rp 40,800.00
2 Mandor L.04 oh 0.0100 Rp 155,000.00 Rp 1,550.00
Jumlah harga persatuan pekerjaan Rp 265,550.00
Biaya umum dan Keuntungan 10% Rp 26,555.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 292,105.00
24 1 m² Membuat Screed Beton (K100) + kawat ayam A.4.1.1.1. Modifikasi Rp 63,995.91
1 Beton mutu, f’c = 7,4 MPa (K100) m³ 0.050 Rp 1,163,561.93 Rp 58,178.10
2 Kawat ayam m2 1.0500 Rp -
Jumlah harga persatuan pekerjaan Rp 58,178.10
Biaya umum dan Keuntungan 10% Rp 5,817.81
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 63,995.91
25 1 m³ Memasang Pondasi Batu Kosong (Aanstamping) A.3.2.1.9. Rp 590,779.20
Bahan:
1 Batu Belah 15/20 cm m³ 1.2000 Rp 235,000.00 Rp 282,000.00
2 Pasir Urug m³ 0.4320 Rp 186,000.00 Rp 80,352.00
Tenaga Kerja:
1 Pekerja L.01 oh 0.7800 Rp 136,000.00 Rp 106,080.00
2 Tukang batu L.02 oh 0.3900 Rp 145,000.00 Rp 56,550.00
3 Kepala tukang L.03 oh 0.0390 Rp 155,000.00 Rp 6,045.00
4 Mandor L.04 oh 0.0390 Rp 155,000.00 Rp 6,045.00
Jumlah harga persatuan pekerjaan Rp 537,072.00
Biaya umum dan Keuntungan 10% Rp 53,707.20
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 590,779.20
26 1 m³ Pemasangan Pondasi Batu Belah mortar type N 1 PC : 4 PP 2.1.1.b.(a) Rp 1,024,375.00
Bahan:
1 Batu Belah 15/20 cm m³ 1.0500 Rp 235,000.00 Rp 246,750.00
2 Semen kg 163.000 Rp 1,500.00 Rp 244,500.00
3 Pasir pasang m³ 0.5200 Rp 200,000.00 Rp 104,000.00
Tenaga Kerja:
1 Pekerja L.01 oh 1.5000 Rp 136,000.00 Rp 204,000.00
2 Tukang batu L.02 oh 0.7500 Rp 145,000.00 Rp 108,750.00
3 Kepala tukang L.03 oh 0.0750 Rp 155,000.00 Rp 11,625.00
4 Mandor L.04 oh 0.0750 Rp 155,000.00 Rp 11,625.00
Jumlah harga persatuan pekerjaan Rp 931,250.00
Biaya umum dan Keuntungan 10% Rp 93,125.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,024,375.00
27 1 m' Pasangan Kanstein Beton uk. 60/30/15 cm Rp 295,603.43
Bahan :
1 Galian Tanah m³ 0.0270 Rp 95,823.75 Rp 2,587.24
2 Urugan Pasir m³ 0.0300 Rp 303,105.00 Rp 9,093.15
3 Kanstein uk. 60 x 15 x 30 cm bh 1.6600 Rp 120,000.00 Rp 199,200.00
4 Semen kg 6.0000 Rp 1,500.00 Rp 9,000.00
5 Pasir pasang m³ 0.0080 Rp 200,000.00 Rp 1,600.00
Tenaga Kerja:
1 Pekerja L.01 oh 0.1000 Rp 136,000.00 Rp 13,600.00
2 Tukang batu L.02 oh 0.2000 Rp 145,000.00 Rp 29,000.00
3 Kepala tukang L.03 oh 0.0200 Rp 155,000.00 Rp 3,100.00
4 Mandor L.04 oh 0.0100 Rp 155,000.00 Rp 1,550.00
Jumlah harga persatuan pekerjaan Rp 268,730.39
Biaya umum dan Keuntungan 10% Rp 26,873.04
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 295,603.43
28 1 bh Pemasangan Baut Angkur A 325 Ø16mm Analisa lapangan Rp 206,459.00
Bahan:
Analisa Harga Satuan Struktur - 48 of ?
NO. Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga
1 Baut Angkur A 325 Ø16mm bh 1.0000 Rp 135,000.00 Rp 135,000.00
2 Alat Bantu ls 1.0000 Rp 47,250.00 Rp 47,250.00
Tenaga Kerja:
1 Pekerja L.01 oh 0.0400 Rp 136,000.00 Rp 5,440.00
Jumlah harga persatuan pekerjaan Rp 187,690.00
Biaya umum dan Keuntungan 10% Rp 18,769.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 206,459.00
29 1 bh Pemasangan Baut A 325 Ø13mm Analisa lapangan Rp 17,121.50
Bahan:
1 Baut A 325 Ø13mm bh 1.0000 Rp 7,500.00 Rp 7,500.00
2 Alat Bantu ls 1.0000 Rp 2,625.00 Rp 2,625.00
Tenaga Kerja:
1 Pekerja L.01 oh 0.0400 Rp 136,000.00 Rp 5,440.00
Jumlah harga persatuan pekerjaan Rp 15,565.00
Biaya umum dan Keuntungan 10% Rp 1,556.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 17,121.50
30 1 m² Waterproofing Liquid Crystalline (terpasang by vendor) Analisa lapangan Rp 137,500.00
Bahan:
1 Liquid Waterproofing Crystalline m² 1.0000 Rp 125,000.00 Rp 125,000.00
Jumlah harga persatuan pekerjaan Rp 125,000.00
Biaya umum dan Keuntungan 10% Rp 12,500.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 137,500.00
31 1 m² Pengecatan 1 m2 Permukaan Baja dengan Menie Besi (Zinc Chromate)
3.3.14.(c) Rp 43,584.75
Bahan:
1 Meni besi Kg 0.1000 Rp 35,000.00 Rp 3,500.00
2 Kuas bh 0.0100 Rp 65,000.00 Rp 650.00
3 Pengencer L 0.0100 Rp 26,500.00 Rp 265.00
Tenaga Kerja:
1 Pekerja L.01 oh 0.0200 Rp 136,000.00 Rp 2,720.00
2 Tukang cat L.02 oh 0.2000 Rp 145,000.00 Rp 29,000.00
3 Kepala tukang L.03 oh 0.0200 Rp 155,000.00 Rp 3,100.00
4 Mandor L.04 oh 0.0025 Rp 155,000.00 Rp 387.50
Jumlah harga persatuan pekerjaan Rp 39,622.50
Biaya umum dan Keuntungan 10% Rp 3,962.25
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 43,584.75
32 1 m² Pemasangan Rangka Atap Baja Ringan (Canai Dingin) Profil C75
A.4.2.1.22. Rp 182,757.30
Bahan:
1 Baja Ringan C75 btg 0.3333 Rp 140,000.00 Rp 46,666.67
2 Reng Baja Ringan btg 0.4750 Rp 85,000.00 Rp 40,375.00
3 Aksesoris ls 1.0000 Rp 4,666.67 Rp 4,666.67
Tenaga Kerja:
1 Pekerja L.01 oh 0.2447 Rp 136,000.00 Rp 33,274.67
2 Tukang besi L.02 oh 0.2447 Rp 145,000.00 Rp 35,476.67
3 Kepala tukang L.03 oh 0.0243 Rp 155,000.00 Rp 3,771.67
4 Mandor L.04 oh 0.0123 Rp 155,000.00 Rp 1,911.67
Jumlah harga persatuan pekerjaan Rp 166,143.00
Biaya umum dan Keuntungan 10% Rp 16,614.30
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 182,757.30
33 1 m³ Lapisan Fondasi Agregat Kelas A Analisa Bina Marga 5.1.(1) Rp 356,358.40
Bahan :
1 Aggregat Kasar m³ 1.2608 Rp 219,000.00 Rp 276,115.20
Peralatan :
1 Wheel Loader jam 0.0071 Rp 750,000.00 Rp 5,325.00
2 Dump truck jam 0.1893 Rp 150,000.00 Rp 28,395.00
3 Motor Grader jam 0.0106 Rp 650,000.00 Rp 6,890.00
4 Vibrator Roller jam 0.0136 Rp 450,000.00 Rp 6,120.00
Tenaga Kerja :
1 Pekerja jam 0.0494 Rp 19,428.57 Rp 959.77
2 Mandor jam 0.0071 Rp 22,142.86 Rp 157.21
Jumlah harga persatuan pekerjaan Rp 323,962.19
Biaya umum dan Keuntungan 10% Rp 32,396.22
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 356,358.40
Pengurugan dan Pemadatan 1 m3 Sirtu (Aggregat Kasar
34 1 m³ 1.7.2.e (c) Rp 295,031.79
Untuk Pondasi Klas A)
Bahan :
1 Aggregat Kasar Untuk Pondasi Klas A m³ 1.2000 Rp 219,000.00 Rp 262,800.00
Peralatan :

Tenaga Kerja :
1 Pekerja jam 0.2500 Rp 19,428.57 Rp 4,857.14
2 Mandor jam 0.0250 Rp 22,142.86 Rp 553.57
Jumlah harga persatuan pekerjaan Rp 268,210.71
Biaya umum dan Keuntungan 10% Rp 26,821.07
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 295,031.79

TAMBAHAN
35 1 m' Pengeboran Tanah untuk pondasi strauss pile dia. 30 cm (A.2.2.1.16) Rp 30,244.50
Analisa Harga Satuan Struktur - 49 of ?
NO. Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga

Bahan :
1 Oli + Solar Ls 1.0000 Rp -
2 Alat Bantu 0.2200 Rp -
Peralatan :
1 Crawler Crane jam 0.1550 Rp -
2 Mesin Bor jam 0.1550 Rp -
Tenaga Kerja:
1 Tukang batu L.02 oh 0.1800 Rp 145,000.00 Rp 26,100.00
2 Mandor L.04 oh 0.0090 Rp 155,000.00 Rp 1,395.00
Jumlah harga persatuan pekerjaan Rp 27,495.00
Biaya umum dan Keuntungan 10% Rp 2,749.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 30,244.50
36 1 m² Pemasangan Panel Beton Pracetak 50x50x240 cm untuk Pagar
A.1.1.1.16. Rp 580,305.00
Bahan :
1 Panel beton precast mutu beton K-250 lbr 0.9860 Rp 120,000.00 Rp 118,320.00
2 Kolom H-Beam mutu beton K-250 btg 0.5250 Rp 390,000.00 Rp 204,750.00
3 Semen portland kg 45.0000 Rp 1,500.00 Rp 67,500.00
4 Pasir beton m³ 0.0740 Rp 270,000.00 Rp 19,980.00
5 Batu Split 2/3 m³ 0.1460 Rp 295,000.00 Rp 43,070.00
Peralatan :
jam Rp -
Tenaga Kerja:
1 Pekerja L.01 oh 0.3750 Rp 136,000.00 Rp 51,000.00
2 Tukang besi L.02 oh 0.1250 Rp 145,000.00 Rp 18,125.00
3 Kepala tukang L.03 oh 0.0120 Rp 155,000.00 Rp 1,860.00
4 Mandor L.04 oh 0.0190 Rp 155,000.00 Rp 2,945.00
Jumlah harga persatuan pekerjaan Rp 527,550.00
Biaya umum dan Keuntungan 10% Rp 52,755.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 580,305.00
37 1 m' Pemasangan Kawat Duri Rp 5,555.00
Bahan :
Kawat Duri 2 mm @P = 50 m m' 1.020 Rp -
JUMLAH HARGA BAHAN Rp -
Peralatan :

JUMLAH HARGA ALAT Rp -


Tenaga Kerja:
Pekerja L.01 oh 0.033 Rp 136,000.00 Rp 4,533.33
Mandor L.04 oh 0.003 Rp 155,000.00 Rp 516.67
JUMLAH HARGA TENAGA KERJA Rp 5,050.00
Jumlah harga persatuan pekerjaan Rp 5,050.00
Biaya umum dan Keuntungan 10% Rp 505.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 5,555.00
38 1 m' Pengeboran Tanah untuk pondasi bore pile dia. 80 cm Rp 92,262.50
Peralatan :
1 Mesin Bor jam 0.0667 Rp 850,000.00 Rp 56,695.00
Tenaga Kerja:
1 Pekerja L.02 oh 0.1800 Rp 136,000.00 Rp 24,480.00
2 Tukang L.04 oh 0.0090 Rp 145,000.00 Rp 1,305.00
3 Mandor L.04 oh 0.0090 Rp 155,000.00 Rp 1,395.00
Jumlah harga persatuan pekerjaan Rp 83,875.00
Biaya umum dan Keuntungan 10% Rp 8,387.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 92,262.50
39 1 kg Pembesian pelat secara manual 2.2.7.a.(a) Rp 15,331.80
Bahan:
1 Besi Wiremesh kg 10.2000 Rp 12,500.00 Rp 127,500.00
2 Kawat beton kg 0.0500 Rp 16,500.00 Rp 825.00
Tenaga Kerja:
1 Pekerja L.01 oh 0.0250 Rp 136,000.00 Rp 3,400.00
2 Tukang besi L.02 oh 0.0250 Rp 145,000.00 Rp 3,625.00
3 Kepala tukang L.03 oh 0.0250 Rp 155,000.00 Rp 3,875.00
4 Mandor L.04 oh 0.0010 Rp 155,000.00 Rp 155.00
Jumlah pekerjaan per sepuluh kg Rp 139,380.00
Jumlah harga persatuan pekerjaan Rp 13,938.00
Keuntungan+Over head 10% Rp 1,393.80
Total = Jumlah+(Keuntungan+Over head 10%) Rp 15,331.80
40 1 m² Bekisting lantai Floordeck tipe pelat (JAP < 0,8 m) B.12.b Rp 185,278.50
Bahan:
1 Kaso 5/7 cm m³ 0.0014 Rp 2,300,000.00 Rp 3,220.00
2 Balok Kayu 8/12cm m³ 0.0089 Rp 4,500,000.00 Rp 40,050.00
3 Paku 5cm dan 7cm kg 0.2300 Rp 17,500.00 Rp 4,025.00
4 Steel Floordeck m2 1.0800 Rp 95,000.00 Rp 102,600.00
Tenaga Kerja:
1 Pekerja L.01 oh 0.0800 Rp 136,000.00 Rp 10,880.00
2 Tukang Kayu L.02 oh 0.0400 Rp 145,000.00 Rp 5,800.00
3 Kepala tukang L.03 oh 0.0040 Rp 155,000.00 Rp 620.00
4 Mandor L.04 oh 0.0080 Rp 155,000.00 Rp 1,240.00
Jumlah harga persatuan pekerjaan Rp 168,435.00
Keuntungan+Over head 10% Rp 16,843.50
Analisa Harga Satuan Struktur - 50 of ?
NO. Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga
Total = Jumlah+(Keuntungan+Over head 10%) Rp 185,278.50

41 1 m² Pemasangan 1 m2 Lapisan Ijuk Tebal 10 cm (pemasangan 1 m2 Lapisan


A.1.5.1.13. RpSeptik)
Ijuk Tebal 20 cm untuk Bidang Resapan Tangki 1,039,995.00
Bahan:
1 Ijuk kg 12.0000 Rp 75,000.00 Rp 900,000.00
Tenaga Kerja:
1 Pekerja L.01 oh 0.3000 Rp 136,000.00 Rp 40,800.00
2 Mandor L.04 oh 0.0300 Rp 155,000.00 Rp 4,650.00
Jumlah harga persatuan pekerjaan Rp 945,450.00
Keuntungan+Over head 10% Rp 94,545.00
Total = Jumlah+(Keuntungan+Over head 10%) Rp 1,039,995.00

42 1 m³ Pengurugan 1 m3 dengan Pasir Urug 1.7.2.d (c) Rp 256,361.11


Bahan:
1 Pasir urug kg 1.0000 Rp 186,000.00 Rp 186,000.00
Tenaga Kerja:
1 Pekerja L.01 oh 0.3333 Rp 136,000.00 Rp 45,333.33
2 Mandor L.04 oh 0.0111 Rp 155,000.00 Rp 1,722.22
Jumlah harga persatuan pekerjaan Rp 233,055.56
Keuntungan+Over head 10% Rp 23,305.56
Total = Jumlah+(Keuntungan+Over head 10%) Rp 256,361.11

Analisa Harga Satuan Struktur - 51 of ?


HARGA SATUAN TERPASANG STRUKTUR
PEKERJAAN PEMBANGUNAN RUMAH SAKIT REGIONAL
KELAS C KABUPATEN BONE - TAHAP LANJUTAN
TAHUN ANGGARAN 2023

HARGA SATUAN
NO. URAIAN PEKERJAAN
TERPASANG

PEKERJAAN PERSIAPAN
1 1 m¹ Pengukuran dan pemasangan bowplank Rp 75,212.50
2 1 m' Pagar sementara dari seng gelombang tinggi 2 meter Rp 653,757.50
3 1 m² Pembuatan 1 m2 Kantor Sementara/Rumah Jaga/Gudang Semen dan Peralatan
Rp Lantai
1,086,415.00
Plesteran, Dinding
4 1 m³ Membuang Tanah Keluar Site Rp 39,625.07
PEKERJAAN STRUKTUR
1 1 m³ Penggalian 1 m3 tanah biasa sedalam s.d. 1 m untuk volume > 2000 m3 Rp 95,823.75
2 1 m³ Penggalian 1 m3 Tanah Biasa sedalam > 1 m s.d. 2 m untuk volume 200 s.d Rp 2000 m3 112,488.75
3 1 m³ Penggalian 1 m3 Tanah Biasa sedalam > 2 m s.d. 3 m untuk volume 200 s.d Rp 2000 m3 126,654.00
4 1 m³ Penggalian 1 m3 tanah berbatu > 3 m, setiap tambah dalam 1 m untuk volume Rp 200 s.d 83,393.20
2000 m3 (A) (U)
5 1 m³ Timbunan atau urugan kembali tanah biasa/liat berpasir Rp 303,105.00
6 1 m³ Beton untuk lantai kerja (bedding) Beton fc' = 7,4 s.d. 9,8 MPa (K-100 s.d. K-125)
Rp 1,058,742.14
7 1 kg Memasang Besi Beton BJTP 28 Rp 17,061.00
8 1 kg Memasang Besi Beton BJTS 420 Rp 17,061.00
9 1 m² Memasang bekisting untuk kolom (3x Pakai) Rp 238,646.22
10 1 m² Memasang bekisting untuk balok (3x Pakai) Rp 241,946.22
11 1 m² Memasang bekisting untuk dinding (3x Pakai) Rp -
12 1 m² Memasang bekisting untuk plat lantai (3x Pakai) Rp 502,264.00
13 1 m² Memasang bekisting untuk tangga Rp 315,249.00
14 1 m² Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm Tebal ½ Batu dengan Mortar Rp tipe
294,217.00
N,fc’ 5,2 Mpa ( Seta
15 1 bh Memasang Buis Beton Ø800mm; t=50mm; p=500mm Rp 390,335.00
16 1 m³ Pengecoran Beton menggunakan Ready Mixed dan pompa beton Rp 1,328,415.00
18 1 m³ Beton mutu, f’c = 14,5 MPa (K175) Rp 1,276,885.50
19 1 m³ Beton mutu, f’c = 19,3 MPa (K225) Rp 1,341,667.64
20 1 Kg Pembuatan 1 kg Baja Profil Rp 40,953.00
21 1 m³ Pengurugan Kembali 1 m3 Galian Tanah Rp 58,327.50
22 1 m³ Pemadatan Tanah1 m3 per 20 cm dengan alat Timbris Rp 45,925.00
23 1 m³ Pengurugan 1 m3 dengan Pasir Urug Rp 292,105.00
24 1 m² Membuat Screed Beton (K100) + kawat ayam Rp 63,995.91
25 1 m³ Memasang Pondasi Batu Kosong (Aanstamping) Rp 590,779.20
26 1 m³ Pemasangan Pondasi Batu Belah mortar type N 1 PC : 4 PP Rp 1,024,375.00
27 1 m' Pasangan Kanstein Beton uk. 60/30/15 cm Rp 295,603.43
28 1 bh Pemasangan Baut Angkur A 325 Ø16mm Rp 206,459.00
29 1 bh Pemasangan Baut A 325 Ø13mm Rp 17,121.50
30 1 m² Waterproofing Liquid Crystalline (terpasang by vendor) Rp 137,500.00
31 1 m² Pengecatan 1 m2 Permukaan Baja dengan Menie Besi (Zinc Chromate) Rp 43,584.75
32 1 m² Pemasangan Rangka Atap Baja Ringan (Canai Dingin) Profil C75 Rp 182,757.30
33 1 m³ Lapisan Fondasi Agregat Kelas A Rp 356,358.40
34 1 m³ Pengurugan dan Pemadatan 1 m3 Sirtu (Aggregat Kasar Untuk Pondasi KlasRp A) 295,031.79
35 1 m' Pengeboran Tanah untuk pondasi strauss pile dia. 30 cm (A.2.2.1.16) Rp 30,244.50
36 1 m² Pemasangan Panel Beton Pracetak 50x50x240 cm untuk Pagar Rp 580,305.00
37 1 m' Pemasangan Kawat Duri Rp 5,555.00
38 1 m' Pengeboran Tanah untuk pondasi bore pile dia. 80 cm Rp 92,262.50
39 1 kg Pembesian pelat secara manual Rp 15,331.80
40 1 m² Bekisting lantai Floordeck tipe pelat (JAP < 0,8 m) Rp 185,278.50
41 1 m² Pemasangan 1 m2 Lapisan Ijuk Tebal 10 cm (pemasangan 1 m2 Lapisan Ijuk RpTebal 1,039,995.00
20 cm untuk Bidang Re
42 1 m³ Pengurugan 1 m3 dengan Pasir Urug Rp 256,361.11

Harga Satuan Terpasang Struktur - 52 of 52


HARGA BAHAN DAN UPAH ARSITEKTUR
PEKERJAAN PEMBANGUNAN RUMAH SAKIT REGIONAL
KELAS C KABUPATEN BONE - TAHAP LANJUTAN
TAHUN ANGGARAN 2023

NO URAIAN

A. DAFTAR UPAH
1 Pekerja 136000 oh
2 Tukang kayu 145000 oh
3 Tukang batu 145000 oh
4 Tukang cat 145000 oh
5 Tukang Plafond 145000 oh
6 Kepala tukang 155000 oh
7 Mandor 155000 oh

B. BAHAN PASANGAN DAN BESI


1 Bata merah kelas 1 Rp 750 bh
2 Bata ringan 100x200x600 mm Rp 8,831 bh
3 Batako Rp 4,250 bh
4 Batu Split 1/2 Rp 295,000 m³
Rp 219 kg
5 Batu Belah Rp 235,000 m³
6 Besi beton U-28 Rp 12,500 kg
7 Semen mortar pasangan/ perekat bata ringan (GE Mortar) Rp 2,000 kg
8 Semen mortar plesteran bata ringan (GE Mortar) Rp 1,550 kg
9 Semen mortar acian bata ringan (GE Mortar) Rp 2,150 kg
10 Semen mortar Self leveling floor @ 40 kg Rp 80,500 zak
11 Semen mortar Pemasangan Floor Hardener (fosroc) Rp 3,200 kg
12 Aggregat Kasar Untuk Pondasi Klas A Rp 219,000 m³
13 Semen Rp 1,500 kg
14 Semen warna Rp 20,500 kg
15 Pasir beton Rp 270,000 m³
Rp 200 kg
16 Pasir pasang Rp 200,000 m³
17 Pasir urug Rp 186,000 m³
18 Tanah urug Rp 110,000 m³
19 U-dict 30 x 40 cm, mutu beton K-350 Rp 315,000 bh
20 U-dict 40 x 60 cm, mutu beton K-350 Rp 485,000 bh
21 U-dict 60 x 80 cm, mutu beton K-350 Rp 656,000 bh
22 Buis Beton diameter 120 cm, tinggi 50 cm Rp 412,500 bh
23 Waterproofing Membrane sheet (Fosroc) Rp 85,000 m²
24 Waterproofing coating Elastomeric Acrylic/ Terpasang (Fosroc) Rp 63,750 m²
25 Primer waterproofing (Fosroc) Rp 19,470 kg

C. BAHAN PASANGAN PENUTUP LANTAI DAN DINDING


1 Lantai homogenius tile 60 x 60 cm - Polished (Niro granite) Rp 82,800 bh
2 Lantai homogenius tile 60 x 60 cm - Unpholish (Niro granite) Rp 81,000 bh
3 Lantai homogenius tile 20 x 60 cm - Polished cutting size Rp 27,600 bh
4 Lantai homogenius tile 30 x 60 cm + step noising tangga Rp 41,400 bh
5 Lantai keramik tile 60 x 60 cm (unpolished) Rp 59,400 bh
6 Homogenous tile 30 x 60 cm (Niro granite) Rp 40,500 bh
7 Lantai vinyl sheet (armstrong) Rp 270,875 m²
8 Lantai karpet (armstrong) Rp 233,750 m²
9 Underlayer bawah karpet Rp 63,750 m²
10 Paving block, tebal 8 cm natural K-300 Rp 145,000 m²
11 Plint homogenius tile 10 x 60 cm cutting size Rp 7,875 bh
12 Plint homogenius tile 10 x 30 cm cutting size Rp 3,938 bh
13 Step Noising kermaik 5 x 20 cm Rp 7,500 bh
14 Batu granite alam (PT. Raspari megastone) Rp 1,134,000 m²
15 Batu Andesite Rp 160,000 m²
16 Glassblock uk. 20 x 20 cm Rp 21,250 bh
17 Allumunium Composite Panel PVDF 0.3 mm tebal 4 mm alloy 3003 (MARKS) Rp 300,000 m²
18 Panel GRC Motif Islami tebal 9 cm + rangka (by Specialist) Rp 575,000 m²
19 Hospital plint/skriting (granito) Rp 31,880 bh
20 Vinyl wall covering (vinyl dinding) Rp 33,962 m²
21 Bumper guard+Aksesories terpasang (Pinger) Rp 450,000 m'
- Alumunium Extrude profil
- Cover Vinyl Handrail
- Endcap Section

Upah dan Bahan Arsitektur - page 53 of 209


NO URAIAN
22 Raill guard+Aksesories terpasang (Pinger) Rp 720,000 m'
- Alumunium Extrude profil 140mm
- Cover Vinyl Handrail 140mm
- Braket Wall
- Return Section (End Cap)
23 Hospital curtain & Rail komplit set (Medical Track) Rp 750,000 m'
- Rail RS Komplit set
- Kain menggunakan Type Polyester FN Lebar 2.8 m Warna Cream dan Putih 235000 m'
24 Stainless steel framing lift Rp 1,431,400 m²
25 Timbal 2 mm Rp 1,680,000 m²

D. BAHAN KAYU
1 Dolken kayu dia. 8-10/400 cm Rp 47,000 btg
2 Kayu papan begisting kelas IV Rp 2,142,000 m³
3 Kayu 5/7 kelas IV Rp 2,040,000 m³
4 Kayu Kelas III Rp 3,000,000 m³
5 Kayu Kelas IV Rp 2,040,000 m³
6 Balok Kayu Kelas II. Rp 4,752,000 m³
7 Balok Kayu Kelas I Rp 15,600,000 m³
8 Plywood 9 mm Rp 127,500 lbr
9 Multiplex 12 mm Rp 265,000 lbr

E. BAHAN PARTISI DAN PLAFOND


1 Gypsum board 1200 mm x 2400 mm x 9 mm Rp 70,000 lbr
2 Gypsum board 1200 mm x 2400 mm x 12 mm Rp 95,000 lbr
3 GRC 1200 mm x 2400 mm x 4 mm Rp 72,000 lbr
4 List plafond gypsum t=5 cm Rp 10,630 m'
5 Rangka hollow 40.40.0.45 mm Rp 14,250 m'
6 Plafond akustik tile uk. 600 x 1200 x 15 mm (knauf) Rp 298,500 m²
- Edge/ design : Tegular 24 edge
- Pattern/ surface : Smooth surface with small hole
- Suspension system : System C (lay in system)
- Rangka : T-Grid 24
- Warna : Putih RAL 9010
- Upah pasang dan material bantu

F. SANITAIR
1 Kloset duduk lengkap dengan aksesoris (American standart) Rp 2,659,680 bh
2 Kloset jongkok lengkap dengan aksesoris (American standart) Rp 458,880 bh
3 Wastafel gantung lengkap dengan aksesoris (American standart) Rp 935,640 bh
4 Wastafel undercounter lengkap dengan aksesoris (American standart) Rp 1,944,000 bh
5 Jet washer (American standart) Rp 292,800 bh
6 Kran dinding (American standart) Rp 210,240 bh
7 Kaca cermin Rp 367,200 m²
8 Soap holder (American standart) Rp 374,400 bh
9 Tisue holder (American standart) Rp 474,240 bh
10 Shower dan kran lengkap dengan aksesories (American standart) Rp 1,396,800 bh
11 Soap dispenser (INNO) Rp 163,020 bh
12 Cove ligth wastafel MDF board Rp 423,300 m'
13 Sloof zink + kran lengkap dengan aksesoris (SK33) Rp 6,717,600 bh
14 Service zink + kran lengkap dengan aksesoris (SK322E) Rp 9,648,000 bh
15 Floor drain (American standart) Rp 322,560 bh
16 Kitchen Zink Stainless Steel satu lubang dengan water drain + kran lengkap dengan aksesoris Rp 780,000 bh
17 Hand Dryer (Hoffman) Rp 1,132,800 bh
18 Tempat duduk kamar mandi Rp 3,076,128 unit
19 Cubical toilet clear tempered glass laminbated tebal 2x6mm Rp 2,448,000 m²
- w/. Patterned laminated finished lengkap support, hardware & accesories
- Cubicle fitting : Door hinge, door handle, door lock, coat hook.
- Pedestal : Stainless steel head bar, alumunium stopper, U chanel alumunium profile anodize colour
20 Phenolic cubicle toilet system tebal 12 mm Rp 1,950,000 m²
- Cubicle fitting : Door hinge, door handle, door lock, coat hook.
- Pedestal : Stainless steel head bar, alumunium stopper, U chanel alumunium profile anodize colour
21 Grill Besi Stainless Steel Lebar 30 cm Rp 350,000.00 m'
22 Grill Besi Stainless Steel Lebar 40 cm Rp 410,000.00 m'

G. BAHAN FINISHING
1 Plamur (1 pail = @ 20 kg) Rp 23,000 kg
2 Cat emultion paint (1 pail = @ 25 kg) (mowilex) Rp 54,500 kg
3 Cat weathershield (1 pail = @ 25 kg) (mowilex) Rp 85,000 kg
4 Tape Rp 35,000 Roll
5 Amplas Rp 7,500 Lmbr
Upah dan Bahan Arsitektur - page 54 of 209
NO URAIAN
5 Cat enamel paint (epoxy) Rp 73,100 kg
6 Cat dustrproof Rp 63,750 kg
7 Cat dasar interior Rp 27,700 kg
8 Cat dasar exterior Rp 27,700 kg
9 Residu Rp 3,060 ltr
10 Pengencer ltr
H. BAHAN PINTU DAN JENDELA
a. Material Alumunium & Kaca
1 Alumunium Kusen Pintu (Alexindo) Rp 140,000 m'
2 Alumunium Kusen Jendela (Alexindo) Rp 140,000 m'
3 Alumunium Frame Daun Pintu (Alexindo) Rp 110,000 m'
4 Alumunium Frame Daun Jendela (Alexindo) Rp 105,000 m'
5 Alumunium louvre (Alexindo) Rp 561,000 m²
6 Alumunium profil U penjepit kaca Rp 35,000 m'
7 Rangka hollow alumunium 40x40 t:1mm Rp 72,000 m'
8 Kaca anti radiasi 20 mm Rp 7,200 cm²
9 Kaca Clear 6 mm Rp 288,000 m²
10 Kaca tinted 6 mm Rp 482,400 m²
11 Kaca tinted 8 mm Rp 643,200 m²
12 Kaca tempered 8 mm Rp 597,600 m²
13 Kaca tempered 12 mm Rp 806,400 m²
14 Skrup fixer Rp 336 bh
15 Profil kaca Rp 9,696 m'
16 Sealent dengan lakban ex. GE/ Wacker non stain atau setara Rp 45,900 tube
17 Alumunium Sistem Curtain Wall
- Tiang Vertikal (mullion). Uk. 40 x 100 tebal 2 mm Rp 95,376 m'
- Cover mullion (omega) tebal 1 mm Rp 50,496 m'
- Ambang Transome tebal 1,2 mm Rp 72,936 m'
- Bracket Rp 16,836 pcs
- Kaca Reflected 8 mm Rp 387,600 m²
- List Karet Rp 5,616 m'
- Sealent Rp 6,732 m'
- Paku Skrup Rp 336 bh
- Pisher Rp 1,680 bh
- Dinabold Rp 2,808 bh
18 Ram Kawat Harmonika Rp 78,000 m²

b. Hardware (Dekkson):
1 Pull handle Rp 593,600 set
2 Lever Handle LHTR 0017 SSS Rp 198,755 set
3 Floor Hinge Rp 1,134,560 set
4 Top patch fitting kaca - wall (ex. PT 24 + PT 20) Rp 543,312 set
5 Bottom Patch fitting kaca (ex. PT 10) Rp 1,069,600 set
6 FH Top Pivot pintu alumunium/ kayu Rp 255,136 set
7 Top patch Rp 204,680 set
8 Kunci pintu kaca US 10 Rp 97,440 set
9 Mortise Lock Rp 240,128 set
10 Cylinder Rp 107,520 set
11 Door closer Rp 477,568 set
12 Engsel pintu Rp 83,563 bh
13 Kunci tanam Flush Bolt FB 040 S/S 8 + 18 SSS Rp 238,661 set
14 Rel pintu slidding door Rp 749,706 bh
15 Friction Stay Jendela Rp 125,440 bh
16 Window Handle (Casement) Rp 25,760 bh
17 Operator Mesin Aoutomatic + Radar (DORMA ES 200) Rp 45,920,000 unit
- Dilengkapi dengan : Mechanic Door Carrier, Alumunium profil, Electronic
board, Motor, sensor radar, optima selector, electrical lock, manual
release, Emergency Battery

c. Daun Pintu Engineering door, frame kayu meranti, PVC laminated Sheet (Sampoerna)
1 Daun Pintu Frame kayu meranti, PVC laminated Sheet ( 750 x 2100 ) Rp 1,292,500 unit
2 Daun Pintu Frame kayu meranti, PVC laminated Sheet uk. 700 x 2100 Rp 1,292,500 unit
+ kaca 8 mm (700 x 1800 mm)
3 Daun Pintu Frame kayu meranti, PVC laminated Sheet uk. 900 x 2100 Rp 1,688,500 unit
+ kaca 8 mm (700 x 1800 mm)
4 Daun Pintu Frame kayu meranti, PVC laminated Sheet uk. 900 x 2100. Rp 1,688,500 unit
+ kaca 8 mm (200 x 700 mm)
5 Daun Pintu Frame kayu meranti, PVC laminated Sheet uk. 1200 x 2150 Rp 2,150,500 unit
+ kaca 8 mm (200 x 700 mm)
6 Daun Pintu Frame kayu meranti, core solid balsa PVC laminated Sheet uk. 900 x 2100 Rp 1,358,500 unit
7 Daun Pintu Frame kayu meranti, core solid balsa PVC laminated Sheet uk. 1000 x 2100 Rp 1,947,000 unit

Upah dan Bahan Arsitektur - page 55 of 209


NO URAIAN
8 Daun Pintu Frame kayu meranti, core solid balsa PVC laminated Sheet uk. 1200 x 2100 Rp 2,150,500 unit

d. Pintu Otomatis dan Pintu Besi (Marks)


1 SINGLE STEEL DOOR uk. 600x1250 (Plat daun 0.8mm, plat kusen 1.5mm) + Accesories Rp 2,337,500 unit
2 SINGLE STEEL DOOR uk. 900x2150 mm (Plat daun 0.8mm, plat kusen 1.5mm) + Accessories Rp 7,128,000 unit
3 SINGLE STEEL DOOR uk. 1200x2150 mm (Plat daun 0.8mm, plat kusen 1.5mm) + Accessories Rp 8,250,000 unit
4 SINGLE STEEL DOOR uk. 2x900x2150 mm (Plat daun 0.8mm, plat kusen 1.5mm) + Accessories Rp 10,824,000 unit
5 SINGLE STEEL DOOR uk. 1200x2150 mm (Tahan Api+panic handle) (Plat daun 0.8mm, plat kusen 1.5mm) Rp 13,464,000 unit
6 SINGLE STEEL DOOR uk. 900x2150 with Lover (Plat daun 0.8mm, plat kusen 1.5mm) + Accessories Rp 7,128,000 unit
7 SINGLE STEEL DOOR uk. 2x900x2150 with Lover (Plat daun 0.8mm, plat kusen 1.5mm) + Accessories Rp 10,824,000 unit
8 Pintu Radiation Door lapis PB 2mm, uk. 900 x 2150 mm (Zeltech) Rp 26,741,000 unit
9 Pintu Radiation Door lapis PB 2mm, uk. 2 x 900 x 2150 mm (Zeltech) Rp 51,788,000 unit

I. PEKERJAAN ATAP
1 Genteng metal berpasir tebal 3mm Rp 150,000 m²
2 Insulasi alumunium foil (isoflex) Rp 32,000 m²
3 Talang seng Rp 26,000 m
4 Lisplank GRC Rp 27,500 m

J. LAIN - LAIN
1 Air 100 ltr
2 Paku 17500 kg
3 Minyak bekisiting 65000 ltr
4 Paku biasa 17500 kg
5 Seng Gelombang BJLS 40 PJG 2 mtr 135000 lbr
6 Besi Hollow 40 x 40 Rp 6,200 m'
7 Besi Hollow Galvanis 20 x 40 m'
8 Besi Hollow Galvanis 20 x 20 m'
9 Kawat beton Rp 27,000 kg
10 List alumunium profil U 1 cm Rp 17,500 m'
11 Lem/adhesive Rp 60,000 ltr
12 Meja Konter Rp 2,300,000 m'
Rangka kamper, multiplek 18mm, lapis HPL
Edging HPL, top counter fin. Solid surface (motif batu granit)
List Alumunium tebal 2 cm
Laci 3 susun
Fabrikasi dan pemasangan
13 Railling tangga Rp 1,200,000 m'
∅80 mm Timber Handrail W/. Clear Stained Finished
14 Hand railing menempel di dinding Rp 250,000 m'
- BSP ø 2" w/ synthetic enamel paint finished
15 Railling di tangga darurat Rp 450,000 m'
- Hand Railing BSP ø 2" w/ synthetic enamel paint finished
- BSP ø 2" w/ synthetic enamel paint finished
- BSP ø 1" w/ synthetic enamel paint finished
16 Railling ramp besi pipa stainless steel sesuai gambar Rp 750,000 m'
- ø 20 mm stainless steel railing w/ black matt paint finished
- 2 x (10x80) mm thick stainless steel plate railing
17 Sealtape Rp 7,500 bh
18 Wheel Loader 1.0 - 1.6 M3 96 HP Kap.1,5 Ton Rp 650,000 jam
19 Motor Grader > 100 HP Kap.10.800 HP Rp 650,000 jam
20 Vibrator Roller 5-8 T 82 HP Kap.7,1 Ton Rp 450,000 jam
21 Water Tanker 3000 - 4500 L Rp 350,000 jam
22 Pneumatic Tire Roller 8-10 T Rp 550,000 jam
23 Dump truck 3-4 ton Rp 350,000 jam

K. MODULAR OPERATING THEATRE (ZELTECH)


1 Base Dumper : SS-304 1200 mm x 200 mm x 1.2 mm Rp 635,375 m2
2 Lighting Standard : 3x16 W LED ~ 32W.220 V TL c/w COVER : ACRYLIC Rp 28,730,000 unit
3 Flooring : Vinyl, Scretch Resistance Anti Static 3.0 mm x 2 m x 20 m, merk LG Medistep Medistudio Rp 1,012,544 m2
4 Capping Aluminium Rp 76,661 Set
5 Cove Aluminium Rp 93,691 Set
6 PIR INTERIOR PANEL (Color 0.45 mm BMT + SS304 2B) T. 5CM - Dinding (ZELTECH) Rp 2,740,400 m2
7 PIR INTERIOR PANEL (Color 0.45 mm BMT + SS304 2B) T. 5CM - Plafond (ZELTECH) Rp 2,740,400 m2
8 Wall Glass Printing Tempered 10mm + Aksessories Rp 4,641,000 m2
9 X-Ray viemer : 2 Films + Auto/Manual + LED + Dimmer Rp 50,277,500 Set
10 Instrument Cabinet : Glass Door Rp 61,520,875 Set
11 Information Panel : W/RECORDING TABLE 1194 x 126 x 20 Rp 20,791,264 Set
12 Operation Timer : Analog 1 Digital x 2 Rp 30,588,610 Set
13 In used Lamp : LED ~ c/w COVER : ACRYLIC Rp 3,867,500 Set
14 Automatic sliding door (Hermatic) by Dorton Rp 273,000,000 Set

Upah dan Bahan Arsitektur - page 56 of 209


NO URAIAN
15 Passbox Magnetik System Inaterlock UV 1 X 18 WATT dan TL SS304 HL 1,2 MM (60 X 45 X 60) Rp 64,918,750 bh
16 Srub Up Sink, Sensor system activated tapware 3 Spout merk Austindo (2400 x 600 x 1600 mm) Rp 349,110,944 bh
17 Electric Driven - Swing Dual Arm Surgery & ICU Pendant Merk Aeonmed CP8401 Rp 471,165,513 bh
18 Electrical Driven - Swing Dual Arm Anaesthesia Pendant Merk Aeonmed CP8403 Rp 519,706,889 bh

Upah dan Bahan Arsitektur - page 57 of 209


DAFTAR HARGA SATUAN UPAH

Pekerjaan : PERENCANAAN RUMAH SAKIT REGIONAL KELAS C KABUPATEN BONE


Lokasi : Kabupaten Bone - Indonesia
Tahun Anggaran : 2023
Bidang : Pekerjaan LANSKAP

HARGA HARGA
NO. KETERANGAN UPAH SATUAN
SATUAN / SATUAN / JAM
A B C D E = D/8

1 Tukang Besi Konstruksi OH Rp 145,000 Rp 18,125


2 Tukang Besi Tulangan OH Rp 145,000 Rp 18,125
3 Kepala Tukang Besi OH Rp 155,000 Rp 19,375
4 Tukang Kayu Kasar (Plafond, Kuda/Gordin, R. Atap) OH Rp 145,000 Rp 18,125
5 Tukang Kayu Halus (Kusen) OH Rp 145,000 Rp 18,125
6 Kepala Tukang Kayu OH Rp 155,000 Rp 19,375
7 Tukang Batu Kasar OH Rp 145,000 Rp 18,125
8 Tukang Batu Halus (Bata, Plester, Acian) OH Rp 145,000 Rp 18,125
9 Kepala Tukang Batu OH Rp 155,000 Rp 19,375
10 Tukang Cat Biasa OH Rp 145,000 Rp 18,125
11 Kepala Tukang Cat OH Rp 155,000 Rp 19,375
12 Tukang Listrik OH Rp 145,000 Rp 18,125
13 Kepala Tukang Listrik OH Rp 155,000 Rp 19,375
14 Pekerja OH Rp 136,000 Rp 17,000
15 Mandor OH Rp 155,000 Rp 19,375

Harga Upah Labor Landscape - page 58 of 208


HARGA BAHAN DAN UPAH PEKERJAAN INTERIOR
PEKERJAAN PEMBANGUNAN RUMAH SAKIT REGIONAL
KELAS C KABUPATEN BONE - TAHAP LANJUTAN
TAHUN ANGGARAN 2023

NO BAHAN/MATERIAL QTY HARGA (Rp) SATUAN


1 Pekerja 136,000.00 oh
2 Tukang Kayu 145,000.00 oh
3 Mandor 155,000.00 oh
4 Multiplek meranti 18mm 1.00 320,000.00 lbr
5 Multiplek meranti 12mm 1.00 265,000.00 lbr
6 Multiplek meranti 9mm 1.00 127,500.00 lbr
7 Multiplek albasia 6mm 1.00 75,000.00 lbr
8 Melaminto 18mm 1 muka 1.00 290,000.00 lbr
9 Melaminto 12mm 1 muka 1.00 220,000.00 lbr
10 Melaminto 9mm 1 muka 1.00 210,000.00 lbr
11 HPL CT 7873 T salta cherry 1.00 165,000.00 lbr
12 HPL CT 7841 T steyr ash 1.00 175,000.00 lbr
13 HPL CT 0518 brushed silver 1.00 605,000.00 lbr
14 HPL CT 0298 F clear white 1.00 130,000.00 lbr
15 HPL CT 5571 T seaside oak 1.00 168,500.00 lbr
16 HPL CT 0273 T golden yellow 1.00 135,000.00 lbr
17 HPL CT 5173 T white oak 1.00 173,000.00 lbr
18 HPL CT 0136 T graphite 1.00 150,000.00 lbr
19 HPL CT 5923 T cocoa ash 1.00 180,000.00 lbr
20 HPL CT 5498 T african teak 1.00 171,000.00 lbr
21 HPL CT 5441 T cream pine 1.00 178,000.00 lbr
22 HPL CT 5442 T sweet pine 1.00 172,000.00 lbr
23 HPL CT 0101 T white 1.00 148,000.00 lbr
24 Edging carta 21mm 1.00 7,500.00 btg
25 Edging carta 42mm 1.00 10,000.00 btg
26 CnC cutting 1.00 200,000.00 m²
27 Cat kayu 1.00 75,000.00 kaleng
28 Dempul 1.00 45,000.00 kaleng
29 Lem 1.00 60,000.00 kaleng
30 Paku/skrup 1.00 7,500.00 bks
31 Lis stainless mirror 15mm 1.00 50,000.00 btg
32 Grommet lubang kabel 80mm 1.00 15,000.00 pc
33 Akrilik susu 3mm 1.00 500,000.00 lbr
34 LED strip warm white 12v plus trafo/adaptor 1.00 250,000.00 roll
35 Kabel NYM 2x1.5 1.00 15,800.00 m¹
36 Rel sliding drawer ball bearing 30kg Hafele 1.00 190,000.00 set
37 Rel sliding drawer soft close Hafele 1.00 150,000.00 set
38 Engsel lurus soft close Hafele 1.00 30,000.00 set
39 Engsel stgh bengkok soft close Hafele 1.00 50,000.00 set
40 Engsel full bengkok soft close Hafele 1.00 80,000.00 set
41 Roda caster plastik 2inci 1.00 30,000.00 set
42 Spring hinge engsel 2 arah + skrup (pintu koboi) 1.00 130,000.00 set
43 Stop kontak inbow + skrup 1.00 65,000.00 pc
44 Handle tanam aluminium 1.00 45,000.00 btg
45 Dudukan ambalan kaca nuho 1.00 5,000.00 pc
46 Hospital plint fiber 1.00 70,000.00 btg
47 Dextone silikon sealant akrilik warna putih 1.00 40,000.00 pc
48 Washtafel keramik blanco naya 6 1.00 7,000,000.00 pc
49 Keran air blanco mili 1.00 450,000.00 pc
50 Kaca clear 5mm 1.00 125,000.00 lbr
51 Letter sign stainless mirror+backlight tinggi 10cm dengan dudukan 1.00 150,000.00 pc
52 Letter sign stainless mirror+backlight tinggi 15cm dengan dudukan 1.00 225,000.00 pc

Harga Bahan
53 Logo custom akrilik 1.00 15,000.00 cm
54 Gantungan baju mekanikal Hafele 1.00 650,000.00 pc
55 Backpainted glass Glasstone+pemasangan 1.00 1,600,000.00 m²
56 Quadra quartz sand 1.00 7,650,000.00 slab
57 Quadra ceppo grigio 1.00 8,750,000.00 slab
58 Radilum hospital plint lurus 1.00 90,000.00 btg
59 Radilum hospital plint sudut dalam/luar 1.00 45,000.00 pc
60 Radilum hospital plint end cap 1.00 35,000.00 pc
61 Rangka hollow galvanis 3x3 tebal 1mm 1.00 98,000.00 btg
62 Rangka hollow gypsum 4x4 tebal 0,9mm 1.00 142,000.00 btg
63 Gypsum gyproc topline 9mm 1.00 75,000.00 lbr
64 Rockwool 60 1200x600 1.00 91,666.67 lbr
65 Wallpaper+pemasangan 1.00 195,000.00 m²
66 Kursi petugas ex. Informa sieben gilbert 1.00 3,000,000.00 unit
67 Kursi tunggu ex. Informa h series 2 seater 1 table 1.00 2,760,000.00 unit
68 Sofa 1 seater ex. Dekoruma prodesign eva 1.00 4,200,000.00 unit
69 Sofa 1 seater ex. Dekoruma heim aiko 1.00 3,900,000.00 unit
70 Sofa 3 seater ex. Dekoruma maesta steven 1.00 5,400,000.00 unit
71 Meja direktur ex. Informa maine 1.00 5,478,000.00 unit
72 Kursi direktur ex. Informa sieben genzo 1.00 13,800,000.00 unit
73 Meja tamu ex. Informa maverick 1.00 6,000,000.00 unit
74 Meja rapat ex. Informa sieben 1.00 7,200,000.00 unit
75 Meja rapat serbaguna ex. Informa 1.00 4,500,000.00 set
76 Kursi rapat ex. Informa sunon hero 1.00 7,380,000.00 unit
77 Sofa L kiri ex. Informa ferrara biella 1.00 36,600,000.00 unit
78 Sofa 2 seater ex. Informa ferrara biella 1.00 19,800,000.00 unit
79 Sofa 1 seater ex. Informa ferrara biella 1.00 13,440,000.00 unit
80 Meja makan ex. Dekoruma aveda bill-3 1.00 21,000,000.00 unit
81 Kursi makan ex. Informa norwin 1.00 2,340,000.00 unit
82 Hospital Bed termasuk matras, nakas pasien dan tray by MMT Grand 1.00 25,800,000.00 set

Harga Bahan
SUMBER HARGA BAHAN TANAMAN

PROJECT NAME : PERENCANAAN RUMAH SAKIT REGIONAL KELAS C KABUPATEN BONE


Sub Pekerjaan : Lanskap
LOCATION : Kabupaten Bone - Indonesia
Tahun Anggaran : 2023

NO NAMA LOKAL NAMA ILMIAH SPESIFIKASI SATUAN HARGA

A B C D F G
I. BAHAN PENUNJANG DAN MEDIA TANAM DAN VERTICAL GARDEN
1 Pupuk Kandang 1 karung : 25 Kg karung Rp 250,000
2 Furadan kg Rp 21,000
3 Atonik/Rotone Botol Rp 36,000
4 NPK Kg Rp 82,000
5 Ijuk (Pengikat) ikatan Rp 7,500
6 Top Soil Tanah Subur M3 Rp 250,000
7 Bambu Steger Dia 8 s/d 10 cm, panjang 4 m Trunk Rp 25,000
8 Geotextile non Woven 150 gr m2 Rp 11,250
9 Media Tanam Planter Box m3 Rp 175,000
10 Vertical Garden Full System Fully Automatic Irrigation System m2 Rp 62,500
II TANAMAN
POHON
1 Yellow Flamboyant Peltophorum pterocarpum Height 4-5 m, Dia. Trunk 10-12 cm nos Rp 250,000
2 Red Flamboyant Delonix regia Height 4 m, Dia. Trunk 15 cm nos Rp 300,000
3 Sawo Kecik Manikara kauki Height 2.5-3 m, Dia. Trunk 2.5-4 cm nos Rp 450,000
4 Kelapa Cocos Nucifera Height 3,5-4 m, Dia. Trunk 15-20 cm nos Rp 350,000
5 Tabebuia Bunga Kuning Tabebuia chrysantha Height 4 m, Dia. Trunk 10-12 cm nos Rp 250,000
6 Ketapang Kencana Terminalia mantaly Height 4 m, Dia. Trunk 6-8 cm nos Rp 350,000
7 Pulai Fossil Alstonia scholaris Height 6-7 m, Dia. Trunk 80-100 cm nos Rp 2,350,000
8 Tabebuia Bunga Pink Tabebuia Rosea Height 4 m, Dia. Trunk 10-12 cm nos Rp 350,000
9 Trambesi Samanea saman Height 4-5 m, Dia. Trunk 10-12 cm nos Rp 750,000
SEMAK DAN GROUNDCOVER
1 Spider Lily Hymenocalis littoralis Height 30 cm Plb Rp 12,500
2 Bougenvillea Bougenvillea Height 30-40 cm Plb Rp 35,000
3 Kanna Daun Kuning Canna Generalis Height 40-50 cm Plb Rp 30,000
4 Jungle Geranium Merah Ixora javanica Height 40 cm Plb Rp 25,000
5 Walisongo Schefllera arboricola Height 30-35 cm Plb Rp 30,000
6 Yellow peanut Arachis pintoi Height 5 cm Plb Rp 32,000
7 Canna Canna Generalis Height 30-40 cm Plb Rp 25,000
8 Golden Torch Heliconia pssitacorum Height 30-40 cm Plb Rp 37,500
9 Rumput Bermuda Cynodon dactylon Hydroseeding m2 Rp 30,000

NO JENIS BATU ALAM GAMBAR SPESIFIKASI SATUAN HARGA


A B C D F G
1 Batu Andesit 30 x 30 tebal 3 cm Abu Bakar m2 Rp 345,000
2 Batu Andesit 30 x 30 tebal 1,4 cm Abu Bakar m2 Rp 140,000

Harga Bahan Tanaman dan Street Furniture Landscape - page 61 of 208


HARGA SATUAN TERPASANG ARSITEKTUR
PEKERJAAN PEMBANGUNAN RUMAH SAKIT REGIONAL
KELAS C KABUPATEN BONE - TAHAP LANJUTAN
TAHUN ANGGARAN 2023

NO. URAIAN PEKERJAAN HARGA SATUAN


PEKERJAAN ARSITEK
1 1 m² Pemasangan Dinding Bata Merah 1/2 Batu ,Campuran 1 SP : 3 PP Rp 155,353.00
2 1 m² Pemasangan Dinding Bata Merah 1/2 Batu ,Campuran 1 SP : 5 PP Rp 148,714.50
3 1 m² Pemasangan Pelesteran , 1 SP : 3 PP, tebal 15 mm Rp 91,810.40
4 1 m² Pemasangan Pelesteran , 1 SP : 5 PP, tebal 15 mm Rp 51,404.10
5 1 m² Membuat acian semen Rp 54,642.50
6 1 m² Pemasangan Dinding Bata Ringan Tebal 10cm dengan Mortar Siap Rp 206,556.09
7 1 m² Pasangan plesteran semen instan tebal 1 cm Rp 64,017.71
8 1 m² Pekerjaan acian (semen instan) Rp 39,050.00
9 1 m' Membuat nat tali air profil U alumunium Rp 33,465.67
10 1 m' Pek. Opening Pintu dan Jendela semen instan Rp 17,006.17
11 1 m' Pek. Opening Pintu dan Jendela semen biasa Rp 24,164.73
12 1 m' Pemasangan kolom praktis 11/11 cm Rp 105,924.50
13 1 m' Pemasangan balok praktis 10/15 cm Rp 140,719.70
14 1 m³ Pemasangan meja beton tebal 10 cm Rp 4,686,751.50
15 1 m² Pemasangan dinding homogenous tile 30 x 60 cm Rp 371,701.00
16 1 m' Pemasangan homogenius tile 10 x 60 cm Rp 50,161.38
17 1 m' Pemasangan homogenius tile 10 x 30 cm Rp 50,161.38
18 1 m' Pemasangan hospital plint Rp 157,740.00
19 1 m' Pemasangan Plint Vinyl Sheet Rp 71,055.65
20 1 m' Pemasangan Plint kayu tebal 2 cm lebar 10 cm Rp 85,910.00
21 1 m' Pemasangan Bumper Guard Rp 528,467.50
22 1 m' Pemasangan Rail Guard Rp 825,467.50
23 1 m² Pemasangan Batu Andesite Rp 382,453.50
24 1 m² Pemasangan Batu Granite Alam Rp 1,518,439.67
25 1 m² Pemasangan Glassblock Rp 635,449.38
26 1 m² Pemasangan Stainless steel framing Rp 1,520,878.00
27 1 m² Pekerjaan Alumunium Composite Panel PVDF 0.3 mm Alloy 3003 Rp 751,113.00
28 1 m' Aluminium composit panel flashing (penutup antara CW dengan bata) Rp 214,483.50
29 1 m² Panel GRC Motif Islami tebal 9 cm + rangka (by Specialist) Rp 769,825.42
30 1 m² Pemasangan dinding partisi gypsum board tbl. 12 mm Rp 270,398.79
31 1 m² Pemasangan dinding partisi gypsum tbl. 12 mm 1 lapis soundproof Rp 342,299.83
32 1 m² Pemasangan dinding partisi gypsum tbl. 12 mm 1 lapis Rp 232,299.83
33 1 cm Pangadaan dan pemasangan Signate Stainless steel tebal 0,6 mm Rp 16,215.83
34 1 cm Pangadaan dan pemasangan Lambang Stainless steel tebal 0,6 mm Rp 26,665.83
35 1 m² Pemasangan Timbal 2 mm Rp 1,963,754.38
36 1 m² Pekerjaan penutup atap genteng metal berpasir tebal 3mm + insulasi Rp 255,645.50
37 1 m' Pemasangan lisplank GRC Rp 39,381.95
38 1 m² Pekerjaan Clading dinding fin HPL Rp 920,260.00
39 1 m² Pekerjaan vinyl wall cavering (dinding vinyl) Rp 157,995.49
40 1 m' Meja Counter fabrikasi Rp 2,530,000.00
41 1 m' Pemasangan Railing ∅80 mm Timber Handrail W/. Clear Stained Finished Rp 1,391,362.50
42 1 m' Pemasangan Railling di tangga pipa BSP ø 2" sesuai gambar Rp 566,362.50
43 1 m' Pemasangan Railling ramp besi pipa stainless steel sesuai gambar Rp 896,362.50
44 1 m' Pemasangan Hand Railling pipa BSP sesuai gambar Rp 322,575.00
45 1 m' Pekerjaan Hospital curtain & Rail komplit set (Medical Track). Rp 1,163,662.50
46 1 m' Pemasangan Saluran U-Ditch 30x40, mutu beton K-350 Rp 327,855.00
47 1 m' Pemasangan Saluran U-Ditch 40x60, mutu beton K-350 Rp 486,805.00
48 1 m' Pemasangan Saluran U-Ditch 60x80, mutu beton K-350 Rp 646,690.00
49 1 Unit Pengadaan dan pemasangan Buis Beton dia. 120, tinggi 50 cm Rp 419,017.50
50 1 m² PekerjaanBase Dumper : SS-304 1200 mm x 200 mm x 1.2 mm Rp 501,193.00
51 1 m² Flooring : Vinyl, Scretch Resistance Anti Static 3.0 mm x 2 m x 20 m Rp 1,286,811.90
52 1 m² PIR INTERIOR PANEL (Color 0.45 mm BMT + SS304 2B) T. 5CM - Dinding Rp 3,097,952.00
53 1 m² PIR INTERIOR PANEL (Color 0.45 mm BMT + SS304 2B) T. 5CM - Plafond (ZELTECH) Rp 3,039,080.00
54 1 m² Wall Glass Printing Tempered 10mm + Aksessories Rp 5,663,709.15
PEKERJAAN PELAPIS LANTAI
1 1 m² Pemasangan lantai homogenius tile 20 x 60 cm (cutting size) Rp 384,351.00
2 1 m² Pemasangan lantai homogenius tile 60 x 60 cm (Polished) Rp 384,351.00
3 1 m² Pemasangan lantai homogenius tile 60 x 60 cm (Unpolished) Rp 378,576.00
4 1 m² Pemasangan lantai keramik tile 60 x 60 cm (kasar) Rp 309,276.00
5 1 m² Pemasangan lantai homogenius tile 30 x 60 cm dengan step noising tangga Rp 366,201.00
6 1 m² Pemasangan Floor Hardener Rp 57,761.00
7 1 m' Pemasangan Step Noising keramik 5 x 20 cm Rp 73,958.50

Harga Satuan Terpasang Arsitektur - page 62 of 208


NO. URAIAN PEKERJAAN HARGA SATUAN
8 1 m² Pemasangan lantai vinyl sheet Rp 470,976.00
9 1 m² Pasangan lantai karpet + underlayer Rp 446,022.50
10 1 m² Pemasangan waterproofing coating Rp 83,036.25
11 1 m² Pemasangan waterproofing membran sheet Rp 151,791.68
12 1 m² Pemasangan paving block tebal 8 cm Rp 348,151.65
13 1 m² Pemasangan Pelapis Lantai Plaza Rp 284,093.02
PEKERJAAN PLAFOND
1 1 m² Pemasangan Langit-langit ( Plafond ) Gypsum board uk. ( 120 x 240 x 9)mmm, tebal 9mm Rp 67,793.00
2 1 m² Pemasangan plafond GRC board T=4mm dengan rangka metal furing Rp 68,593.80
3 1 m² Pemasangan rangka besi hollow galvalum 40.40. 0.45 mm, modul 60x60cm untuk plafond Rp 185,407.75
4 1 m' Pemasangan List alumunium profil U 2 cm Rp 57,244.00
5 1 m' Pemasangan List profil gypsum 5 cm Rp 29,127.34
6 1 m² Pemasangan plafond akustik tile uk. 60 x 120 cm Rp 328,350.00
7 1 m² Pemasangan plafond metal ceilling linier Rp 771,045.00
8 1 m' Pemasangan drop ceilling gypsum Rp 89,989.35
PEKERJAAN SANITARY
1 1 bh Pemasangan kloset duduk lengkap dengan aksesoris Rp 5,816,200.50
2 1 bh Pemasangan kloset jongkok lengkap dengan aksesoris Rp 952,624.98
3 1 bh Pemasangan wastafel gantung lengkap dengan aksesoris Rp 1,487,904.00
4 1 bh Pemasangan Wastafel Undercounter lengkap dengan aksesoris Rp 2,737,130.00
5 1 m' Cove ligth wastafel MDF board Rp 430,901.90
6 1 m² Kaca cermin Rp 474,402.50
7 1 bh Pemasangan jet washer Rp 395,254.75
8 1 bh Pemasangan Kran dinding Rp 304,438.75
9 1 bh Soap holder Rp 476,808.75
10 1 bh Soap dispenser Rp 244,290.75
11 1 bh Tisue holder Rp 586,632.75
12 1 bh Shower dan kran lengkap dengan aksesories Rp 1,609,654.75
13 1 bh Pemasangan floor drain Rp 374,819.50
14 1 bh Pasangan Sloof zink + kran lengkap dengan aksesoris Rp 7,449,370.50
15 1 bh Pasangan Service zink + kran lengkap dengan aksesoris Rp 10,672,810.50
16 1 bh Pemasangan hand dryer lengkap dengan aksesoris Rp 1,413,417.50
17 1 bh Pemasangan Kitchen Zink Stainless Steel satu lubang + kran Rp 918,010.50
18 1 unit Pemasangan Tempat duduk kamar mandi Rp 3,448,709.55
19 1 m² Pemasangan Cubical toilet clear tempered glass 12mm Rp 2,692,800.00
20 1 m² Pasangan Cubical toilet phenolic system tebal 12 mm Rp 2,145,000.00
21 1 m² Pemasangan Grill Besi Stainless Steel Lebar 30 cm Rp 407,962.50
22 1 m² Pemasangan Grill Besi Stainless Steel Lebar 40 cm Rp 473,962.50
PEKERJAAN PENGECATAN
1 1 m² Pengecatan dinding emultion paint Rp 33,260.15
2 1 m² Pengecatan dinding weathershield Rp 41,983.15
3 1 m² Pengecatan dinding dustproof paint Rp 38,435.65
4 1 m² Pengecatan dinding enamel paint (Epoxy) Rp 41,109.75
5 1 m² Pengecatan plafond emultion paint Rp 40,498.15
7 1 m' Pengecatan list plafond weathershield Rp 4,493.12
6 1 m' Pengecatan list plafond emultion paint Rp 3,620.82
8 1 m' Pengecatan list plafond enamel paint (epoxy) Rp 3,620.82
9 1 m' Pengecatan list plafond dustproof paint Rp 3,885.37
10 1 m² Pengecatan plafond weathershield Rp 49,221.15
11 1 m² Pengecatan plafond enamel paint (Epoxy) Rp 41,109.75
12 1 m² Pengecatan plafond dustrproof Rp 38,435.65
13 1 m' Pengecatan plint Int Semi Gloss Rp 3,879.32
PEKERJAAN KUSEN PINTU DAN JENDELA ALLUMUNIUM
1 1 m' Pemasangan alumunium kusen pintu Rp 170,501.00
2 1 m' Pemasangan alumunium kusen jendela Rp 170,501.00
3 1 m² Pemasangan alumunium Frame Daun Pintu Kaca Rp 566,080.00
4 1 m² Pemasangan alumunium Frame Daun Jendela Kaca Rp 544,080.00
5 1 m² Pemasangan Kaca tinted 6 mm Rp 559,174.00
6 1 m² Pemasangan Kaca tinted 8 mm Rp 740,469.50
7 1 m² Pemasangan Kaca clear 6 mm Rp 345,334.00
8 1 m² Pemasangan Kaca tempered 8 mm Rp 690,309.50
9 1 m² Pemasangan Kaca tempered 12 mm Rp 933,979.50
10 1 m² Pemasangan Ram Harmonika Rp 387,946.50
PEKERJAAN KUSEN PINTU
1 1 unit Pemasangan Pintu type D 1A (Gedung A) Rp 20,720,843.53
2 1 unit Pemasangan Pintu type D 2A (Gedung A) Rp 20,720,843.53
3 1 unit Pemasangan Pintu type D uk. 900 x 2200 mm Frameless (Gedung A) Rp 7,007,727.99
4 1 unit Pemasangan Pintu type D 1B (Gedung B) Rp 86,495,017.84
5 1 unit Pemasangan Partisi kaca dan Pintu Uk. 1200x2150 mm (sliding) tipe FR Rp 24,347,175.55
6 1 unit Pemasangan Pintu type A Uk. 900x2150 mm Rp 3,918,272.60

Harga Satuan Terpasang Arsitektur - page 63 of 208


NO. URAIAN PEKERJAAN HARGA SATUAN
7 1 unit Pemasangan Pintu type A Uk. 900x2150 mm + Bouvenlight +2850 AFFL Rp 4,554,768.53
8 1 unit Pemasangan Pintu type A Uk. 1200x2150 mm Rp 4,880,003.04
9 1 unit Pemasangan Pintu type A Uk. 2x900x2150 mm Rp 6,910,189.55
10 1 unit Pemasangan Pintu type A Uk. 2x900x2150 mm + Bouvenlight +2850 AFFL Rp 8,051,895.63
11 1 unit Pemasangan Pintu type B Uk. 900 x 2150 mm Rp 4,917,768.53
12 1 unit Pemasangan Pintu type B Uk. 900 x 2150 mm + Bouvenlight +2850 AFFL Rp 4,486,401.00
13 1 unit Pemasangan Pintu type B Uk. 1200x2150 mm Rp 4,880,003.04
14 1 unit Pemasangan Pintu type B Uk. 2x900x2150 mm Rp 7,636,189.55
15 1 unit Pemasangan Pintu type B Uk. 2x900x2150 mm + Bouvenlight +2850 AFFL Rp 8,777,895.63
16 1 unit Pemasangan Pintu type B Uk.1200x2150 mm (sliding) Rp 4,822,800.73
17 1 unit Pemasangan Pintu type C Uk. 750 x 2150 mm Rp 3,245,685.14
18 1 unit Pemasangan Pintu type C Uk. 750 x 2150 mm + Bouvenlight +2850 AFFL Rp 3,667,675.11
19 1 unit Pemasangan Pintu type C Uk. 900 x 2150 mm Rp 3,871,742.60
20 1 unit Pemasangan Pintu type C Uk. 900 x 2150 mm + Bouvenlight +2850 AFFL Rp 4,508,238.53
21 1 unit Pemasangan Pintu type C Uk. 1000 x 2150 mm Rp 4,519,092.60
22 1 unit Pemasangan Pintu type C Uk. 2x900x2150 mm Rp 6,554,602.67
23 1 unit Pemasangan Pintu type C Uk. 2x900x2150 mm + Bouvenlight +2850 AFFL Rp 7,696,308.75
24 1 unit Pemasangan Pintu type E Uk. 700x2150 mm Rp 3,799,142.60
25 1 unit Pemasangan Pintu type E Uk. 900x2150 mm Rp 4,234,742.60
26 1 unit Pemasangan Pintu type E Uk. 2x900x2150 mm Rp 6,755,277.87
27 1 unit Pemasangan Pintu type E Uk. 900x2150 mm + Bouvenlight +2850 AFFL Rp 4,871,238.53
28 1 unit Pemasangan Pintu type E Uk. 2x900x2150 mm + Bouvenlight +2850 AFFL Rp 7,896,983.95
29 1 unit Pemasangan Pintu type GUD Uk. 2x550x2150 mm Rp 6,755,277.87
30 1 unit Pemasangan Pintu type M Uk. 900x2150 mm Rp 4,234,742.60
31 1 unit Pemasangan Pintu type M Uk. 900x2150 mm + Bouvenlight +2850 AFFL Rp 4,871,238.53
32 1 unit Pemasangan Pintu type M Uk. 2x900x2150 mm Rp 7,636,189.55
33 1 unit Pemasangan Pintu Besi Type A-HM uk. 600 x 1250 mm Rp 2,905,925.00
34 1 unit Pemasangan Pintu Besi Type A-HM uk. 2 x 600 x 1250 mm Rp 5,577,577.50
35 1 unit Pemasangan Pintu Besi Type A-HM uk. 900 x 2150 mm Rp 8,275,877.50
36 1 unit Pemasangan Pintu Besi Type A-HM uk. 1200 x 2150 mm Rp 8,275,877.50
37 1 unit Pemasangan Pintu Besi Type A-HM uk. 1200 x 2150 mm (Tahan Api) Rp 9,510,077.50
38 1 unit Pemasangan Pintu Besi Type A-HM uk. 2 x 900 x 2150 mm Rp 12,408,412.50
39 1 unit Pemasangan Pintu Besi Type C-HM uk. 900 x 2150 mm Rp 8,275,877.50
40 1 unit Pemasangan Pintu Besi Type C-HM uk. 2 x 900 x 2150 mm Rp 12,408,412.50
41 1 unit Pemasangan Pintu Besi Type B-HM, HM (uk. 900 x 2150) Rp 8,275,877.50
42 1 unit Pintu Type B, HM Radiation Door (uk. 900 x 2150) Rp 29,917,112.50
43 1 unit Pintu Type B, HM Radiation Door (uk. 2x 900 x 2150) Rp 57,636,150.00
PEKERJAAN KUSEN DAN DAUN JENDELA
GEDUNG A
1 1 m² Jendela curtain wall system Rp 1,274,460.00
2 1 unit Jendela Tipe DW-2 Rp 1,439,867.42
3 1 unit Jendela Tipe DW-2A Rp 1,653,802.18
4 1 unit Jendela Tipe DW-2A' Rp 2,928,706.85
5 1 unit Jendela Tipe DW-4 Rp 4,625,005.85
6 1 unit Jendela Tipe W-3 Rp 3,265,107.53
7 1 unit Jendela Tipe DW-2IA Rp 2,131,466.46
8 1 unit Jendela Tipe DW-2IA' Rp 2,638,028.59
9 1 unit Jendela Tipe DW-3A Rp 3,606,869.06
10 1 unit Jendela Tipe W-3A Rp 3,562,585.29
11 1 unit Jendela Tipe DW-3A' Rp 3,755,607.94
12 1 unit Jendela Tipe DW-2A" Rp 2,228,359.22
13 1 unit Jendela Tipe DW-1 Rp 1,230,620.90
14 1 unit Jendela Tipe DW-6A Rp 7,256,234.95
15 1 unit Jendela Tipe BV-4E Rp 3,448,506.06
16 1 unit Jendela Tipe BV-2E Rp 1,584,508.57
17 1 unit Jendela Tipe W-4E Rp 15,301,323.69
18 1 unit Jendela Tipe W-1E Rp 3,640,054.45
19 1 unit Jendela Tipe W-3E Rp 8,565,671.20
20 1 unit Jendela Tipe W-5E Rp 17,796,144.16
21 1 unit Jendela Tipe W-2E Rp 6,070,850.73
22 1 unit Jendela Tipe W-6E Rp 18,164,894.17
23 1 unit Jendela Tipe CW-1E Rp 7,540,367.96
24 1 unit Jendela Tipe CW-2E Rp 20,334,962.99

GEDUNG B
1 1 unit Jendela Tipe W-1I Rp 1,292,579.19
2 1 unit Jendela Tipe W-2I Rp 2,331,964.39
3 1 unit Jendela Tipe DW-2I Rp 1,563,821.93
4 1 unit Jendela Tipe DW-2IA Rp 1,696,299.00
5 1 unit Jendela Tipe DW-4I Rp 3,902,559.87

Harga Satuan Terpasang Arsitektur - page 64 of 208


NO. URAIAN PEKERJAAN HARGA SATUAN
6 1 unit Jendela Tipe DW-2IB Rp 1,143,840.31
7 1 unit Jendela Tipe DW-4IA Rp 3,817,566.23
8 1 unit Jendela Tipe DW-2E Rp 4,001,085.68
9 1 unit Jendela Tipe W-1E Rp 4,212,155.07
10 1 unit Jendela Tipe W-2E Rp 6,070,850.73
11 1 unit Jendela Tipe W-3E Rp 8,568,498.42
12 1 unit Jendela Tipe W-7E Rp 24,906,201.10
13 1 unit Jendela Tipe W-5E Rp 17,796,144.16
14 1 unit Jendela Tipe BV-1E Rp 1,234,360.12
15 1 unit Jendela Tipe BV-1EA Rp 1,191,169.52
16 1 unit Jendela Tipe BV-3E Rp 2,663,077.95
17 1 unit Jendela Tipe BV-2E Rp 1,560,003.60
18 1 unit Jendela Tipe LV-3E #REF!
19 1 unit Jendela Tipe LV-8E Rp 7,618,786.09
20 1 unit Jendela Tipe W-4E Rp 15,301,323.69
21 1 unit Jendela Tipe W-8E Rp 27,402,152.46
22 1 unit Jendela Tipe W-2EA Rp 6,410,117.29
23 1 unit Jendela Tipe W-1R Rp 24,172,612.42

GEDUNG C
1 1 m² Jendela curtain wall system Rp 1,274,460.00
2 1 unit Jendela Tipe W-6E Rp 21,710,229.74
3 1 unit Jendela Tipe W-2E Rp 7,580,586.93
4 1 unit Jendela Tipe W-2AE Rp 7,280,901.47
5 1 unit Jendela Tipe W-6AE Rp 13,693,103.88
6 1 unit Jendela Tipe CW-6E Rp 28,851,227.58
7 1 unit Jendela Tipe FR-2 Rp 17,975,471.57
8 1 unit Jendela Tipe FR-4 Rp 16,419,869.98
9 1 unit Jendela Tipe W-5E Rp 18,177,819.04
10 1 unit Jendela Tipe CW-1E Rp 8,810,623.76
11 1 unit Jendela Tipe BV-3I Rp 1,912,095.15
12 1 unit Jendela Tipe BV-4I Rp 4,191,047.81

GEDUNG D1 (GIZI)
1 1 unit Jendela Tipe D-W 5 Rp 11,666,877.93
2 1 unit Jendela Tipe D-BV 5 Rp 4,718,059.54
3 1 unit Jendela Tipe D-BV 3 Rp 2,683,809.44
4 1 unit Jendela Tipe D-W 2 Rp 4,643,471.45
5 1 unit Jendela Tipe D-W 2A Rp 4,850,422.32
6 1 unit Jendela Tipe D-BV 2 Rp 1,516,813.00
7 1 unit Jendela Tipe D-BV 2A Rp 1,948,719.04
8 1 unit Jendela Tipe D-BV 2B Rp 3,428,448.38
9 1 unit Jendela Tipe D-WI 2 Rp 3,033,624.07

GEDUNG D2 (LAUNDRY)
1 1 unit Jendela Tipe D-W 5 Rp 11,666,877.93
2 1 unit Jendela Tipe D-W 3 Rp 6,672,111.12
3 1 unit Jendela Tipe D-W 2 Rp 4,643,471.45
4 1 unit Jendela Tipe D-W 2A Rp 4,850,422.32
5 1 unit Jendela Tipe D-W 2B Rp 4,746,946.88
6 1 unit Jendela Tipe D-W 2C Rp 3,815,667.95
7 1 unit Jendela Tipe D-BV 2 Rp 1,516,813.00
8 1 unit Jendela Tipe D-WI 2 Rp 4,126,094.26
9 1 unit Jendela Tipe D-WI 4 Rp 7,562,521.00

GEDUNG F (MORTUARY)
1 1 unit Jendela Tipe W-5 Rp 11,666,877.93
2 1 unit Jendela Tipe W-3 Rp 6,672,111.12
3 1 unit Jendela Tipe W-2 Rp 5,264,324.07
4 1 unit Jendela Tipe W-2A Rp 5,471,274.94
5 1 unit Jendela Tipe W-1 Rp 1,267,581.58

GEDUNG G (BINA MENTAL)


1 1 unit Jendela Tipe FR-1 Rp 22,757,142.99
2 1 unit Jendela Tipe FR-2 Rp 7,356,386.11
3 1 unit Jendela Tipe FR-3 Rp 7,206,134.83
4 1 unit Jendela Tipe FRI-1 Rp 48,939,455.00
5 1 unit Jendela Tipe BV-2 Rp 1,418,995.80
6 1 unit Jendela Tipe BV-1 Rp 646,696.96
7 1 unit Jendela Tipe BV-1E Rp 1,639,057.64

Harga Satuan Terpasang Arsitektur - page 65 of 208


NO. URAIAN PEKERJAAN HARGA SATUAN

GEDUNG H (ASRAMA)
1 1 unit Jendela Tipe W-3 Rp 6,312,016.60
2 1 unit Jendela Tipe W-2 Rp 4,333,045.14
3 1 unit Jendela Tipe BV-5 Rp 5,322,727.99
4 1 unit Jendela Tipe BV-2 Rp 1,732,766.02
5 1 unit Jendela Tipe BV-1 Rp 932,025.89

GEDUNG J1 (RUMAH DINAS TYPE 70)


1 1 unit Jendela Tipe W-3 Rp 5,174,778.39
2 1 unit Jendela Tipe W-2 Rp 3,537,376.11
3 1 unit Jendela Tipe W-1 Rp 1,899,973.82

GEDUNG J2 (RUMAH DINAS TYPE 50)


1 1 unit Jendela Tipe W-2 Rp 3,537,376.11

GEDUNG K2 (RUMAH POMPA)


1 1 unit Jendela Tipe W-2EB Rp 4,551,631.84
2 1 unit Jendela Tipe W-2EC Rp 2,776,494.05
3 1 unit Jendela Tipe BV-5E Rp 6,594,651.49

GEDUNG K (POWER HOUSE, IPSRS DAN GAS MEDIS)


1 1 unit Jendela Tipe W-2 Rp 2,777,473.99
2 1 unit Jendela Tipe W-3 Rp 3,625,623.49
3 1 unit Jendela Tipe LV-2 Rp 1,437,364.39
4 1 unit Jendela Tipe LV-3 Rp 1,831,221.70

BANGUNAN RUMAH POMPA


1 1 unit Jendela Tipe LV-3 Rp 1,831,221.70

BANGUNAN POS JAGA


1 1 unit Jendela Tipe DW-1 Rp 2,046,893.36
2 1 unit Jendela Tipe W-3' Rp 4,594,830.53
3 1 unit Jendela Tipe W-3 Rp 4,873,395.16
4 1 unit Jendela Tipe BV-1 Rp 1,128,937.99

BANGUNAN TEMPAT PEMBUANGAN SEMENTARA


1 1 unit Jendela Tipe LV-1 Rp 1,625,490.23

PAGAR DEPAN
1 1 unit Ornamen pada Puncak Pilar Rp 435,762.41

Harga Satuan Terpasang Arsitektur - page 66 of 208


ANALISA HARGA SATUAN PEKERJAAN ARSITEKTUR
PEKERJAAN PEMBANGUNAN RUMAH SAKIT REGIONAL
KELAS C KABUPATEN BONE - TAHAP LANJUTAN
TAHUN ANGGARAN 2023

No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan


PEKERJAAN ARSITEKTUR
1 1 m² Pemasangan Dinding Bata Merah 1/2 Batu ,Campuran 1 SP : 3 PP A.4.4.1.8 Rp 155,353.00
Bahan :
1 Bata Merah bh 70.0000 Rp 750.00 Rp 52,500.00
2 Semen kg 14.3700 Rp 1,500.00 Rp 21,555.00
3 Pasir Pasang m³ 0.0400 Rp 200,000.00 Rp 8,000.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.3000 Rp 136,000.00 Rp 40,800.00
2 Tukang batu L.02 oh 0.1000 Rp 145,000.00 Rp 14,500.00
3 Kepala tukang L.03 oh 0.0100 Rp 155,000.00 Rp 1,550.00
4 Mandor L.04 oh 0.0150 Rp 155,000.00 Rp 2,325.00
Jumlah harga persatuan pekerjaan Rp 141,230.00
Biaya umum dan Keuntungan 10% Rp 14,123.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 155,353.00
2 1 m² Pemasangan Dinding Bata Merah 1/2 Batu ,Campuran 1 SP : 5 PP A.4.4.1.10 Rp 148,714.50
Bahan :
1 Bata Merah bh 70.0000 Rp 750.00 Rp 52,500.00
2 Semen kg 9.6800 Rp 1,500.00 Rp 14,520.00
3 Pasir Pasang m³ 0.0450 Rp 200,000.00 Rp 9,000.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.3000 Rp 136,000.00 Rp 40,800.00
2 Tukang batu L.02 oh 0.1000 Rp 145,000.00 Rp 14,500.00
3 Kepala tukang L.03 oh 0.0100 Rp 155,000.00 Rp 1,550.00
4 Mandor L.04 oh 0.0150 Rp 155,000.00 Rp 2,325.00
Jumlah harga persatuan pekerjaan Rp 135,195.00
Biaya umum dan Keuntungan 10% Rp 13,519.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 148,714.50
3 1 m² Pemasangan Pelesteran , 1 SP : 3 PP, tebal 15 mm A.4.4.2.3 (2016) Rp 91,810.40
Bahan :
1 Semen kg 7.7760 Rp 1,500.00 Rp 11,664.00
2 Pasir Pasang m³ 0.0230 Rp 200,000.00 Rp 4,600.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.3000 Rp 136,000.00 Rp 40,800.00
2 Tukang batu L.02 oh 0.1500 Rp 145,000.00 Rp 21,750.00
3 Kepala tukang L.03 oh 0.0150 Rp 155,000.00 Rp 2,325.00
4 Mandor L.04 oh 0.0150 Rp 155,000.00 Rp 2,325.00
Jumlah harga persatuan pekerjaan Rp 83,464.00
Biaya umum dan Keuntungan 10% Rp 8,346.40
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 91,810.40
4 1 m² Pemasangan Pelesteran , 1 SP : 5 PP, tebal 15 mm A.4.4.2.19. Rp 51,404.10
Bahan :
1 Semen kg 5.1840 Rp 1,500.00 Rp 7,776.00
2 Pasir Pasang m³ 0.0260 Rp 200,000.00 Rp 5,200.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.1500 Rp 136,000.00 Rp 20,400.00
2 Tukang batu L.02 oh 0.0750 Rp 145,000.00 Rp 10,875.00
3 Kepala tukang L.03 oh 0.0080 Rp 155,000.00 Rp 1,240.00
4 Mandor L.04 oh 0.0080 Rp 155,000.00 Rp 1,240.00
Jumlah harga persatuan pekerjaan Rp 46,731.00
Biaya umum dan Keuntungan 10% Rp 4,673.10
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 51,404.10
5 1 m² Membuat acian semen A.4.4.2.27. (2016) Rp 54,642.50
Bahan :
1 Semen kg 3.2500 Rp 1,500.00 Rp 4,875.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.2000 Rp 136,000.00 Rp 27,200.00
2 Tukang batu L.02 oh 0.1000 Rp 145,000.00 Rp 14,500.00
3 Kepala tukang L.03 oh 0.0100 Rp 155,000.00 Rp 1,550.00
4 Mandor L.04 oh 0.0100 Rp 155,000.00 Rp 1,550.00
Jumlah harga persatuan pekerjaan Rp 49,675.00
Biaya umum dan Keuntungan 10% Rp 4,967.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 54,642.50
6 1 m² Pemasangan Dinding Bata Ringan Tebal 10cm dengan Mortar Siap A.4.4.1.26. Rp 206,556.09
Bahan :
1 Bata ringan 100x200x600 bh 8.400 Rp 8,831.33 Rp 74,183.13
2 Semen mortar perekat bata ringan kg 0.063 Rp 2,000.00 Rp 126.00
3 Peralatan 10 % dari harga bahan ls 1.000 Rp 883.13 Rp 883.13
Tenaga Kerja :
1 Pekerja L.01 oh 0.671 Rp 136,000.00 Rp 91,256.00
2 Tukang batu L.02 oh 0.130 Rp 145,000.00 Rp 18,850.00
3 Kepala tukang L.03 oh 0.013 Rp 155,000.00 Rp 2,015.00
4 Mandor L.04 oh 0.003 Rp 155,000.00 Rp 465.00
Jumlah Rp 187,778.27
Biaya umum dan Keuntungan 10% Rp 18,777.83
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 206,556.09

Analisa Harga Satuan Arsitektur - page 67 of 212


No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan
7 1 m² Pasangan plesteran semen instan tebal 1 cm Analisa lapangan Rp 64,017.71
Bahan :
1 Semen mortar plesteran kg 16.667 Rp 1,550.00 Rp 25,833.33
Tenaga Kerja :
1 Pekerja L.01 oh 0.083 Rp 136,000.00 Rp 11,333.33
2 Tukang batu L.02 oh 0.125 Rp 145,000.00 Rp 18,125.00
3 Kepala tukang L.03 oh 0.013 Rp 155,000.00 Rp 1,937.50
4 Mandor L.04 oh 0.006 Rp 155,000.00 Rp 968.75
Jumlah Rp 58,197.92
Biaya umum dan Keuntungan 10% Rp 5,819.79
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 64,017.71
8 1 m² Pekerjaan acian (semen instan) 3.2.2.2.35. (a) Rp 39,050.00
Bahan :
1 Semen mortar acian kg 2.000 Rp 2,150.00 Rp 4,300.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.100 Rp 136,000.00 Rp 13,600.00
2 Tukang batu L.02 oh 0.100 Rp 145,000.00 Rp 14,500.00
3 Kepala tukang L.03 oh 0.010 Rp 155,000.00 Rp 1,550.00
4 Mandor L.04 oh 0.010 Rp 155,000.00 Rp 1,550.00
Jumlah Rp 35,500.00
Biaya umum dan Keuntungan 10% Rp 3,550.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 39,050.00
9 1 m' Membuat nat tali air profil U alumunium Analisa lapangan Rp 33,465.67
Bahan :
1 Semen kg 1.0000 Rp 1,500.00 Rp 1,500.00
2 Profil alumunium m' 1.0000 Rp 20,833.33 Rp 20,833.33
Tenaga Kerja :
1 Pekerja L.01 oh 0.0100 Rp 136,000.00 Rp 1,360.00
2 Tukang batu L.02 oh 0.0400 Rp 145,000.00 Rp 5,800.00
3 Kepala tukang L.03 oh 0.0040 Rp 155,000.00 Rp 620.00
4 Mandor L.04 oh 0.0020 Rp 155,000.00 Rp 310.00
Jumlah harga persatuan pekerjaan Rp 30,423.33
Biaya umum dan Keuntungan 10% Rp 3,042.33
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 33,465.67
10 1 m' Pek. Opening Pintu dan Jendela semen instan Analisa modifikasi Rp 17,006.17
Bahan :
1 Pasangan plesteran semen instan tebal 1 cm m' 0.1650 Rp 64,017.71 Rp 10,562.92
2 Membuat acian semen instan m' 0.1650 Rp 39,050.00 Rp 6,443.25
Jumlah harga persatuan pekerjaan Rp 17,006.17
11 1 m' Pek. Opening Pintu dan Jendela semen biasa Analisa modifikasi Rp 24,164.73
Bahan :
1 Pemasangan Pelesteran , 1 SP : 3 PP, tebal 15 mm m' 0.1650 Rp 91,810.40 Rp 15,148.72
2 Membuat acian semen m' 0.1650 Rp 54,642.50 Rp 9,016.01
Jumlah harga persatuan pekerjaan Rp 24,164.73
12 1 m' Pemasangan kolom praktis 11/11 cm A.4.1.1.35 (AHSP. 2016) Rp 105,924.50
1 Kayu kelas III m3 0.0020 Rp 3,000,000.00 Rp 6,000.00
2 Paku 5-10 cm kg 0.0100 Rp 17,500.00 Rp 175.00
3 Minyak bekisting ltr - Rp 65,000.00 Rp -
4 Besi beton polos kg 3.0000 Rp 12,500.00 Rp 37,500.00
5 Kawat beton kg 0.4500 Rp 16,500.00 Rp 7,425.00
6 semen portland kg 4.0000 Rp 1,500.00 Rp 6,000.00
7 Pasir beton m3 0.0060 Rp 270,000.00 Rp 1,620.00
8 Kerikil m3 0.0090 Rp 230,000.00 Rp 2,070.00
Tenaga Kerja:
1 Pekerja oh 0.1800 Rp 136,000.00 Rp 24,480.00
2 Tukang batu oh 0.0200 Rp 145,000.00 Rp 2,900.00
3 Tukang kayu oh 0.0200 Rp 145,000.00 Rp 2,900.00
4 Tukang besi oh 0.0200 Rp 145,000.00 Rp 2,900.00
5 Kepala tukang oh 0.0060 Rp 155,000.00 Rp 930.00
6 Mandor oh 0.0090 Rp 155,000.00 Rp 1,395.00
Jumlah harga persatuan pekerjaan Rp 96,295.00
Biaya umum dan Keuntungan 10% Rp 9,629.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 105,924.50
13 1 m' Pemasangan balok praktis 10/15 cm A.4.1.1.36 Rp 140,719.70
1 Kayu kelas III m3 0.0030 Rp 3,000,000.00 Rp 9,000.00
2 Paku 5-10 cm kg 0.0200 Rp 17,500.00 Rp 350.00
3 Minyak bekisting ltr - Rp 65,000.00 Rp -
4 Besi beton polos kg 3.6000 Rp 12,500.00 Rp 45,000.00
5 Kawat beton kg 0.0500 Rp 16,500.00 Rp 825.00
6 semen portland kg 5.5000 Rp 1,500.00 Rp 8,250.00
7 Pasir beton m3 0.0090 Rp 270,000.00 Rp 2,430.00
8 Kerikil m3 0.0150 Rp 230,000.00 Rp 3,450.00
Tenaga Kerja:
1 Pekerja oh 0.2970 Rp 136,000.00 Rp 40,392.00
2 Tukang batu oh 0.0330 Rp 145,000.00 Rp 4,785.00
3 Tukang kayu oh 0.0330 Rp 145,000.00 Rp 4,785.00
4 Tukang besi oh 0.0330 Rp 145,000.00 Rp 4,785.00
5 Kepala tukang oh 0.0100 Rp 155,000.00 Rp 1,550.00
6 Mandor oh 0.0150 Rp 155,000.00 Rp 2,325.00
Jumlah harga persatuan pekerjaan Rp 127,927.00
Biaya umum dan Keuntungan 10% Rp 12,792.70

Analisa Harga Satuan Arsitektur - page 68 of 212


No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 140,719.70
14 1 m³ Pemasangan meja beton tebal 10 cm Analisa modifikasi Rp 4,686,751.50
1 Beton mutu K 175 ,slump ( 12 + 2) cm m³ 1.0000 Rp 1,276,885.50 Rp 1,276,885.50
2 Besi U 24 (d8-150) kg 52.6667 Rp 17,061.00 Rp 898,546.00
3 Pemasangan bekisting untuk plat lantai 2 kali pakai m² 5.0000 Rp 502,264.00 Rp 2,511,320.00
Jumlah harga persatuan pekerjaan Rp 4,686,751.50
15 1 m² Pemasangan dinding homogenous tile 30 x 60 cm A.4.4.3.13 modifikasi Rp 371,701.00
Bahan :
1 Homogenous tile 30 x 60 cm bh 5.5556 Rp 41,400.00 Rp 230,000.00
2 Semen kg 9.6000 Rp 1,500.00 Rp 14,400.00
3 Pasir pasang m³ 0.0450 Rp 200,000.00 Rp 9,000.00
4 Semen warna kg 1.5000 Rp 20,500.00 Rp 30,750.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.2400 Rp 136,000.00 Rp 32,640.00
2 Tukang batu L.02 oh 0.1200 Rp 145,000.00 Rp 17,400.00
3 Kepala tukang L.03 oh 0.0120 Rp 155,000.00 Rp 1,860.00
4 Mandor L.04 oh 0.0120 Rp 155,000.00 Rp 1,860.00
Jumlah harga persatuan pekerjaan Rp 337,910.00
Biaya umum dan Keuntungan 10% Rp 33,791.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 371,701.00
16 1 m' Pemasangan homogenius tile 10 x 60 cm A.4.4.3.24. modifikasi Rp 50,161.38
Bahan :
1 Plint homogenius tile 10 x 60 cm cutting size bh 1.7500 Rp 7,875.00 Rp 13,781.25
2 Semen kg 1.1400 Rp 1,500.00 Rp 1,710.00
3 Pasir pasang m³ 0.0030 Rp 200,000.00 Rp 600.00
4 Semen warna kg 0.1000 Rp 20,500.00 Rp 2,050.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.0900 Rp 136,000.00 Rp 12,240.00
2 Tukang batu L.02 oh 0.0900 Rp 145,000.00 Rp 13,050.00
3 Kepala tukang L.03 oh 0.0090 Rp 155,000.00 Rp 1,395.00
4 Mandor L.04 oh 0.0050 Rp 155,000.00 Rp 775.00
Jumlah harga persatuan pekerjaan Rp 45,601.25
Biaya umum dan Keuntungan 10% Rp 4,560.13
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 50,161.38
17 1 m' Pemasangan homogenius tile 10 x 30 cm A.4.4.3.24. modifikasi Rp 50,161.38
Bahan :
1 Plint homogenius tile 10 x 30 cm cutting size bh 3.5000 Rp 3,937.50 Rp 13,781.25
2 Semen kg 1.1400 Rp 1,500.00 Rp 1,710.00
3 Pasir pasang m³ 0.0030 Rp 200,000.00 Rp 600.00
4 Semen warna kg 0.1000 Rp 20,500.00 Rp 2,050.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.0900 Rp 136,000.00 Rp 12,240.00
2 Tukang batu L.02 oh 0.0900 Rp 145,000.00 Rp 13,050.00
3 Kepala tukang L.03 oh 0.0090 Rp 155,000.00 Rp 1,395.00
4 Mandor L.04 oh 0.0050 Rp 155,000.00 Rp 775.00
Jumlah harga persatuan pekerjaan Rp 45,601.25
Biaya umum dan Keuntungan 10% Rp 4,560.13
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 50,161.38
18 1 m' Pemasangan hospital plint A.4.4.3.24. modifikasi Rp 157,740.00
Non Standar
Bahan :
1 Hospital plint/skriting bh 3.5000 Rp 31,880.00 Rp 111,580.00
2 Semen kg 1.1400 Rp 1,500.00 Rp 1,710.00
3 Pasir pasang m³ 0.0030 Rp 200,000.00 Rp 600.00
4 Semen warna kg 0.1000 Rp 20,500.00 Rp 2,050.00
Tenaga Kerja :
1 Pekerja oh 0.0900 Rp 136,000.00 Rp 12,240.00
2 Tukang batu oh 0.0900 Rp 145,000.00 Rp 13,050.00
3 Kepala tukang oh 0.0090 Rp 155,000.00 Rp 1,395.00
4 Mandor oh 0.0050 Rp 155,000.00 Rp 775.00
Jumlah harga persatuan pekerjaan Rp 143,400.00
Biaya umum dan Keuntungan 10% Rp 14,340.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 157,740.00
19 1 m' Pemasangan Plint Vinyl Sheet Analisa lapangan Rp 71,055.65
Bahan :
1 Vinyl Sheet m² 0.1050 Rp 270,875.00 Rp 28,441.88
2 Lem/adhesive ltr 0.0800 Rp 135,000.00 Rp 10,800.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.0833 Rp 136,000.00 Rp 11,333.33
2 Tukang batu L.02 oh 0.0833 Rp 145,000.00 Rp 12,083.33
3 Kepala tukang L.03 oh 0.0083 Rp 155,000.00 Rp 1,291.67
4 Mandor L.04 oh 0.0042 Rp 155,000.00 Rp 645.83
Jumlah harga persatuan pekerjaan Rp 64,596.04
Biaya umum dan Keuntungan 10% Rp 6,459.60
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 71,055.65
20 1 m' Pemasangan Plint kayu tebal 2 cm lebar 10 cm Analisa lapangan Rp 85,910.00
Bahan :
1 Papan 1 kayu kelas 1 m³ 0.0030 Rp 15,600,000.00 Rp 46,800.00
2 Paku/sekrup 5 cm kg 0.0500 Rp 17,500.00 Rp 875.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.1000 Rp 136,000.00 Rp 13,600.00

Analisa Harga Satuan Arsitektur - page 69 of 212


No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan
2 Tukang batu L.02 oh 0.1000 Rp 145,000.00 Rp 14,500.00
3 Kepala tukang L.03 oh 0.0100 Rp 155,000.00 Rp 1,550.00
4 Mandor L.04 oh 0.0050 Rp 155,000.00 Rp 775.00
Jumlah harga persatuan pekerjaan Rp 78,100.00
Biaya umum dan Keuntungan 10% Rp 7,810.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 85,910.00
21 1 m' Pemasangan Bumper Guard Analisa lapangan Rp 528,467.50
Bahan :
1 Bumper guard+Aksesories terpasang m' 1.0000 Rp 450,000.00 Rp 450,000.00
- Alumunium Extrude profil
- Cover Vinyl Handrail
- Endcap Section
Tenaga Kerja :
1 Pekerja L.01 oh 0.1000 Rp 136,000.00 Rp 13,600.00
2 Tukang batu L.02 oh 0.1000 Rp 145,000.00 Rp 14,500.00
3 Kepala tukang L.03 oh 0.0100 Rp 155,000.00 Rp 1,550.00
4 Mandor L.04 oh 0.0050 Rp 155,000.00 Rp 775.00
Jumlah harga persatuan pekerjaan Rp 480,425.00
Biaya umum dan Keuntungan 10% Rp 48,042.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 528,467.50
22 1 m' Pemasangan Rail Guard Analisa lapangan Rp 825,467.50
Bahan :
1 Raill guard+Aksesories terpasang m' 1.0000 Rp 720,000.00 Rp 720,000.00
- Alumunium Extrude profil 140mm
- Cover Vinyl Handrail 140mm
- Braket Wall
- Return Section (End Cap)
Tenaga Kerja :
1 Pekerja L.01 oh 0.1000 Rp 136,000.00 Rp 13,600.00
2 Tukang batu L.02 oh 0.1000 Rp 145,000.00 Rp 14,500.00
3 Kepala tukang L.03 oh 0.0100 Rp 155,000.00 Rp 1,550.00
4 Mandor L.04 oh 0.0050 Rp 155,000.00 Rp 775.00
Jumlah harga persatuan pekerjaan Rp 750,425.00
Biaya umum dan Keuntungan 10% Rp 75,042.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 825,467.50
23 1 m² Pemasangan Batu Andesite A.4.4.3.42. modifikasi Rp 382,453.50
Bahan :
1 Batu Andesite m² 1.0600 Rp 160,000.00 Rp 169,600.00
2 Semen kg 8.1900 Rp 1,500.00 Rp 12,285.00
3 Pasir pasang m³ 0.0450 Rp 200,000.00 Rp 9,000.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.7000 Rp 136,000.00 Rp 95,200.00
2 Tukang batu L.02 oh 0.3500 Rp 145,000.00 Rp 50,750.00
3 Kepala tukang L.03 oh 0.0350 Rp 155,000.00 Rp 5,425.00
4 Mandor L.04 oh 0.0350 Rp 155,000.00 Rp 5,425.00
Jumlah harga persatuan pekerjaan Rp 347,685.00
Biaya umum dan Keuntungan 10% Rp 34,768.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 382,453.50
24 1 m² Pemasangan Batu Granite Alam A.4.4.3.42. modifikasi Rp 1,518,439.67
Bahan :
1 Batu granite Alam m² 1.0600 Rp 1,134,000.00 Rp 1,202,040.00
2 Semen kg 8.1900 Rp 1,500.00 Rp 12,285.00
3 Semen warna kg 0.0134 Rp 20,500.00 Rp 274.70
4 Pasir pasang m³ 0.0450 Rp 200,000.00 Rp 9,000.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.7000 Rp 136,000.00 Rp 95,200.00
2 Tukang batu L.02 oh 0.3500 Rp 145,000.00 Rp 50,750.00
3 Kepala tukang L.03 oh 0.0350 Rp 155,000.00 Rp 5,425.00
4 Mandor L.04 oh 0.0350 Rp 155,000.00 Rp 5,425.00
Jumlah harga persatuan pekerjaan Rp 1,380,399.70
Biaya umum dan Keuntungan 10% Rp 138,039.97
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,518,439.67
25 1 m² Pemasangan Glassblock Analisa lapangan Rp 635,449.38
Bahan :
1 Glassblock uk. 20 x 20 cm m² 25.0000 Rp 21,250.00 Rp 531,250.00
2 Semen kg 5.6000 Rp 1,500.00 Rp 8,400.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.1250 Rp 136,000.00 Rp 17,000.00
2 Tukang batu L.02 oh 0.1250 Rp 145,000.00 Rp 18,125.00
3 Kepala tukang L.03 oh 0.0125 Rp 155,000.00 Rp 1,937.50
4 Mandor L.04 oh 0.0063 Rp 155,000.00 Rp 968.75
Jumlah harga persatuan pekerjaan Rp 577,681.25
Biaya umum dan Keuntungan 10% Rp 57,768.13
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 635,449.38
26 1 m² Pemasangan Stainless steel framing Analisa lapangan Rp 1,520,878.00
Bahan :
1 Stainless steel framing lift m² 1.0200 Rp 1,431,400.00 Rp 1,460,028.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.2000 Rp 136,000.00 Rp 27,200.00
2 Tukang batu L.02 oh 0.2000 Rp 145,000.00 Rp 29,000.00
3 Kepala tukang L.03 oh 0.0200 Rp 155,000.00 Rp 3,100.00

Analisa Harga Satuan Arsitektur - page 70 of 212


No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan
4 Mandor L.04 oh 0.0100 Rp 155,000.00 Rp 1,550.00
Biaya umum dan Keuntungan 10% Rp 1,520,878.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,520,878.00
27 1 m² Pekerjaan Alumunium Composite Panel PVDF 0.3 mm Alloy 3003 Analisa lapangan Rp 751,113.00
Bahan :
1 Allumunium Composite Panel PVDF 0.3 mm tebal 4 mm alloy 3003 m² 1.0500 Rp 300,000.00 Rp 315,000.00
2 Rangka hollow alumunium 40x40 t:1mm ex. Alexindo atau setara m' 2.0000 Rp 72,000.00 Rp 144,000.00
3 Braket bh 1.0000 Rp 30,000.00 Rp 30,000.00
4 Stifener alumunium m' 4.0000 Rp 15,000.00 Rp 60,000.00
5 Sealent dengan lakban ex. GE/ Wacker non stain atau setara tube 1.2000 Rp 45,900.00 Rp 55,080.00
Tenaga Kerja:
1 Pekerja L.01 oh 0.1667 Rp 136,000.00 Rp 22,666.67
2 Tukang L.02 oh 0.3333 Rp 145,000.00 Rp 48,333.33
3 Kepala tukang L.03 oh 0.0333 Rp 155,000.00 Rp 5,166.67
4 Mandor L.04 oh 0.0167 Rp 155,000.00 Rp 2,583.33
Jumlah harga persatuan pekerjaan Rp 682,830.00
Biaya umum dan Keuntungan 10% Rp 68,283.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 751,113.00
28 1 m' Aluminium composit panel flashing (penutup antara CW dengan bata) Analisa lapangan Rp 214,483.50
Bahan :
1 Allumunium Composite Panel PVDF 0.3 mm tebal 4 mm alloy 3003 m² 0.3500 Rp 300,000.00 Rp 105,000.00
2 Rangka hollow alumunium 40x40 t:1mm ex. Alexindo atau setara m' 0.6667 Rp 72,000.00 Rp 48,000.00
3 Sealent dengan lakban ex. GE/ Wacker non stain atau setara tube 0.4000 Rp 45,900.00 Rp 18,360.00
Tenaga Kerja:
1 Pekerja L.01 oh 0.0500 Rp 136,000.00 Rp 6,800.00
2 Tukang L.02 oh 0.1000 Rp 145,000.00 Rp 14,500.00
3 Kepala tukang L.03 oh 0.0100 Rp 155,000.00 Rp 1,550.00
4 Mandor L.04 oh 0.0050 Rp 155,000.00 Rp 775.00
Jumlah harga persatuan pekerjaan Rp 194,985.00
Biaya umum dan Keuntungan 10% Rp 19,498.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 214,483.50
29 1 m² Panel GRC Motif Islami tebal 9 cm + rangka (by Specialist) Analisa lapangan Rp 769,825.42
Bahan:
1 Panel GRC Motif Islami tebal 9 cm + rangka (by Specialist) m² 1.0000 Rp 575,000 Rp 575,000.00
2 Support rangka baja siku kg 0.1640 Rp 40,953.00 Rp 6,716.29
Tenaga Kerja:
1 Pekerja L.01 oh 0.2500 Rp 136,000.00 Rp 34,000.00
2 Tukang L.02 oh 0.5000 Rp 145,000.00 Rp 72,500.00
3 Kepala tukang L.03 oh 0.0500 Rp 155,000.00 Rp 7,750.00
4 Mandor L.04 oh 0.0250 Rp 155,000.00 Rp 3,875.00
Jumlah harga persatuan pekerjaan Rp 699,841.29
Biaya umum dan Keuntungan 10% Rp 69,984.13
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 769,825.42
30 1 m² Pemasangan dinding partisi gypsum board tbl. 12 mm A.4.2.1.20. Rp 270,398.79
Bahan :
1 Gypsum board 1200 mm x 2400 mm x 12 mm lbr 0.7292 Rp 95,000.00 Rp 69,270.83
2 Rangka metal hollow 40.40 mm m' 3.5000 Rp 21,250.00 Rp 74,375.00
3 Assesories (perkuatan, las dll) ls 1.0000 Rp 26,031.25 Rp 26,031.25
Tenaga Kerja :
1 Pekerja oh 0.2500 Rp 136,000.00 Rp 34,000.00
2 Tukang batu oh 0.2500 Rp 145,000.00 Rp 36,250.00
3 Kepala tukang oh 0.0250 Rp 155,000.00 Rp 3,875.00
4 Mandor oh 0.0130 Rp 155,000.00 Rp 2,015.00
Jumlah harga persatuan pekerjaan Rp 245,817.08
Biaya umum dan Keuntungan 10% Rp 24,581.71
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 270,398.79
31 1 m² Pemasangan dinding partisi gypsum tbl. 12 mm 1 lapis soundproof A.4.2.1.20. Modifikasi Rp 342,299.83
Bahan :
1 Gypsum board 1200 mm x 2400 mm x 12 mm lbr 0.3646 Rp 95,000.00 Rp 34,635.42
2 Rockwool m² 1.0000 Rp 100,000.00 Rp 100,000.00
3 Rangka metal hollow 40.40 mm m' 3.5000 Rp 21,250.00 Rp 74,375.00
4 Assesories (perkuatan, las dll) ls 1.0000 Rp 26,031.25 Rp 26,031.25
Tenaga Kerja :
1 Pekerja oh 0.2500 Rp 136,000.00 Rp 34,000.00
2 Tukang batu oh 0.2500 Rp 145,000.00 Rp 36,250.00
3 Kepala tukang oh 0.0250 Rp 155,000.00 Rp 3,875.00
4 Mandor oh 0.0130 Rp 155,000.00 Rp 2,015.00
Jumlah harga persatuan pekerjaan Rp 311,181.67
Biaya umum dan Keuntungan 10% Rp 31,118.17
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 342,299.83
32 1 m² Pemasangan dinding partisi gypsum tbl. 12 mm 1 lapis A.4.2.1.20. Modifikasi Rp 232,299.83
Bahan :
1 Gypsum board 1200 mm x 2400 mm x 12 mm lbr 0.3646 Rp 95,000.00 Rp 34,635.42
2 Rangka metal hollow 40.40 mm m' 3.5000 Rp 21,250.00 Rp 74,375.00
3 Assesories (perkuatan, las dll) ls 1.0000 Rp 26,031.25 Rp 26,031.25
Tenaga Kerja :
1 Pekerja oh 0.2500 Rp 136,000.00 Rp 34,000.00
2 Tukang batu oh 0.2500 Rp 145,000.00 Rp 36,250.00
3 Kepala tukang oh 0.0250 Rp 155,000.00 Rp 3,875.00
4 Mandor oh 0.0130 Rp 155,000.00 Rp 2,015.00
Jumlah harga persatuan pekerjaan Rp 211,181.67
Biaya umum dan Keuntungan 10% Rp 21,118.17
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 232,299.83
33 1 cm Pangadaan dan pemasangan Signate Stainless steel tebal 0,6 mm Analisa lapangan Rp 16,215.83
lengkap dengan rangka/ perkuatan dan alat bantu

Analisa Harga Satuan Arsitektur - page 71 of 212


No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bahan :
1 Signage Stainless steel tebal 0,6 mm cm 1.0000 Rp 8,000.00 Rp 8,000.00
Tenaga Kerja :
1 Pekerja oh 0.0083 Rp 136,000.00 Rp 1,133.33
2 Tukang batu oh 0.0333 Rp 145,000.00 Rp 4,833.33
3 Kepala tukang oh 0.0033 Rp 155,000.00 Rp 516.67
4 Mandor oh 0.0017 Rp 155,000.00 Rp 258.33
Jumlah harga persatuan pekerjaan Rp 14,741.67
Biaya umum dan Keuntungan 10% Rp 1,474.17
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 16,215.83
34 1 cm Pangadaan dan pemasangan Lambang Stainless steel tebal 0,6 mm Analisa lapangan Rp 26,665.83
lengkap dengan rangka/ perkuatan dan alat bantu
Bahan :
1 Lambang Stainless steel tebal 0,6 mm cm 1.0000 Rp 17,500.00 Rp 17,500.00
Tenaga Kerja :
1 Pekerja oh 0.0083 Rp 136,000.00 Rp 1,133.33
2 Tukang batu oh 0.0333 Rp 145,000.00 Rp 4,833.33
3 Kepala tukang oh 0.0033 Rp 155,000.00 Rp 516.67
4 Mandor oh 0.0017 Rp 155,000.00 Rp 258.33
Jumlah harga persatuan pekerjaan Rp 24,241.67
Biaya umum dan Keuntungan 10% Rp 2,424.17
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 26,665.83
35 1 m² Pemasangan Timbal 2 mm Analisa lapangan Rp 1,963,754.38
Bahan :
1 Timbal 2 mm m² 1.0200 Rp 1,680,000.00 Rp 1,713,600.00
2 Material penunjang dan alat bantu ls 1.0000 Rp 33,600.00 Rp 33,600.00
Tenaga Kerja :
1 Pekerja oh 0.1250 Rp 136,000.00 Rp 17,000.00
2 Tukang batu oh 0.1250 Rp 145,000.00 Rp 18,125.00
3 Kepala tukang oh 0.0125 Rp 155,000.00 Rp 1,937.50
4 Mandor oh 0.0063 Rp 155,000.00 Rp 968.75
Jumlah harga persatuan pekerjaan Rp 1,785,231.25
Biaya umum dan Keuntungan 10% Rp 178,523.13
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,963,754.38
36 1 m² Pekerjaan penutup atap genteng metal berpasir tebal 3mm + insulasi A.4.5.2.32 (2016) Rp 255,645.50
Bahan :
1 Genteng metal berpasir tebal 3mm m² 1.0000 Rp 150,000.00 Rp 150,000.00
2 Insulasi alumunium foil (isoflex) m² 1.0000 Rp 32,000.00 Rp 32,000.00
3 sekrup Spandek 1/2 ' 1' kg 0.2000 Rp 35,000.00 Rp 7,000.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.2000 Rp 136,000.00 Rp 27,200.00
2 Tukang kayu L.02 oh 0.1000 Rp 145,000.00 Rp 14,500.00
3 Kepala tukang L.03 oh 0.0100 Rp 155,000.00 Rp 1,550.00
4 Mandor L.04 oh 0.0010 Rp 155,000.00 Rp 155.00
Jumlah harga persatuan pekerjaan Rp 232,405.00
Biaya umum dan Keuntungan 10% Rp 23,240.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 255,645.50
37 1 m' Pemasangan lisplank GRC Analisa lapangan Rp 39,381.95
Bahan :
1 Lisplank GRC m² 1.0000 Rp 27,500.00 Rp 27,500.00
2 Paku/sekrup 5 cm kg 0.0415 Rp 17,500.00 Rp 726.78
Tenaga Kerja :
1 Pekerja L.01 oh 0.0500 Rp 136,000.00 Rp 6,800.00
2 Mandor L.04 oh 0.0050 Rp 155,000.00 Rp 775.00
Jumlah harga persatuan pekerjaan Rp 35,801.78
Biaya umum dan Keuntungan 10% Rp 3,580.18
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 39,381.95
38 1 m² Pekerjaan Clading dinding fin HPL Analisa lapangan Rp 920,260.00
Bahan :
1 Rangka Hollow 40x40x1 mm galvanis m' 6.0000 Rp 21,000.00 Rp 126,000.00
2 Multiplek 9 mm lbr 0.3400 Rp 127,500.00 Rp 43,350.00
3 HPL lbr 0.3400 Rp 150,000.00 Rp 51,000.00
4 Nad profil U stainless steel m' 1.0000 Rp 25,000.00 Rp 25,000.00
5 Alat bantu ls 1.0000 Rp 100,000.00 Rp 100,000.00
Tenaga Kerja :
1 Pekerja oh 1.5000 Rp 136,000.00 Rp 204,000.00
2 Tukang kayu oh 1.5000 Rp 145,000.00 Rp 217,500.00
3 Kepala tukang oh 0.3000 Rp 155,000.00 Rp 46,500.00
4 Mandor oh 0.1500 Rp 155,000.00 Rp 23,250.00
Jumlah harga persatuan pekerjaan Rp 836,600.00
Biaya umum dan Keuntungan 10% Rp 83,660.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 920,260.00
39 1 m² Pekerjaan vinyl wall cavering (dinding vinyl) A.4.4.3.59. Rp 157,995.49
Bahan :
1 Vinyl wall covering (vinyl dinding) m² 1.0000 Rp 33,962.26 Rp 33,962.26
2 Lem/adhesive kg 0.2500 Rp 135,000.00 Rp 33,750.00
Tenaga Kerja :
1 Pekerja oh 0.3500 Rp 136,000.00 Rp 47,600.00
2 Tukang kayu oh 0.1750 Rp 145,000.00 Rp 25,375.00
3 Kepala tukang oh 0.0170 Rp 155,000.00 Rp 2,635.00
4 Mandor oh 0.0020 Rp 155,000.00 Rp 310.00

Analisa Harga Satuan Arsitektur - page 72 of 212


No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan
Jumlah harga persatuan pekerjaan Rp 143,632.26
Biaya umum dan Keuntungan 10% Rp 14,363.23
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 157,995.49
40 1 m' Meja Counter fabrikasi Analisa lapangan Rp 2,530,000.00
Meja Konter m' 1.0000 Rp 2,300,000.00 Rp 2,300,000.00
- Rangka kamper, multiplek 18mm, lapis HPL
- Edging HPL, top counter fin. Solid surface (motif batu granit)
- List Alumunium tebal 2 cm
- Laci 3 susun
- Fabrikasi dan pemasangan
Jumlah harga persatuan pekerjaan Rp 2,300,000.00
Biaya umum dan Keuntungan 10% Rp 230,000.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 2,530,000.00
41 1 m' Pemasangan Railing ∅80 mm Timber Handrail W/. Clear Stained Finished
Analisa lapangan Rp 1,391,362.50
Bahan :
1 Railling tangga m' 1.0000 Rp 1,200,000.00 Rp 1,200,000.00
∅80 mm Timber Handrail W/. Clear Stained Finished
Tenaga Kerja :
1 Pekerja oh 0.1250 Rp 136,000.00 Rp 17,000.00
2 Tukang kayu oh 0.2500 Rp 145,000.00 Rp 36,250.00
3 Kepala tukang oh 0.0500 Rp 155,000.00 Rp 7,750.00
4 Mandor oh 0.0250 Rp 155,000.00 Rp 3,875.00
Jumlah harga persatuan pekerjaan Rp 1,264,875.00
Biaya umum dan Keuntungan 10% Rp 126,487.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,391,362.50
42 1 m' Pemasangan Railling di tangga pipa BSP ø 2" sesuai gambar Analisa lapangan Rp 566,362.50
Bahan :
1 Railling di tangga darurat m' 1.0000 Rp 450,000.00 Rp 450,000.00
- Hand Railing BSP ø 2" w/ synthetic enamel paint finished
- BSP ø 2" w/ synthetic enamel paint finished
- BSP ø 1" w/ synthetic enamel paint finished
Tenaga Kerja :
1 Pekerja oh 0.1250 Rp 136,000.00 Rp 17,000.00
2 Tukang kayu oh 0.2500 Rp 145,000.00 Rp 36,250.00
3 Kepala tukang oh 0.0500 Rp 155,000.00 Rp 7,750.00
4 Mandor oh 0.0250 Rp 155,000.00 Rp 3,875.00
Jumlah harga persatuan pekerjaan Rp 514,875.00
Biaya umum dan Keuntungan 10% Rp 51,487.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 566,362.50
43 1 m' Pemasangan Railling ramp besi pipa stainless steel sesuai gambar Analisa lapangan Rp 896,362.50
Bahan :
1 Railling ramp besi pipa stainless steel sesuai gambar m' 1.0000 Rp 750,000.00 Rp 750,000.00
- ø 20 mm stainless steel railing w/ black matt paint finished
- 2 x (10x80) mm thick stainless steel plate railing
Tenaga Kerja :
1 Pekerja oh 0.1250 Rp 136,000.00 Rp 17,000.00
2 Tukang kayu oh 0.2500 Rp 145,000.00 Rp 36,250.00
3 Kepala tukang oh 0.0500 Rp 155,000.00 Rp 7,750.00
4 Mandor oh 0.0250 Rp 155,000.00 Rp 3,875.00
Jumlah harga persatuan pekerjaan Rp 814,875.00
Biaya umum dan Keuntungan 10% Rp 81,487.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 896,362.50
44 1 m' Pemasangan Hand Railling pipa BSP sesuai gambar Analisa lapangan Rp 322,575.00
Bahan :
1 Hand railing menempel di dinding m' 1.0000 Rp 250,000.00 Rp 250,000.00
- BSP ø 2" w/ synthetic enamel paint finished
Tenaga Kerja :
1 Pekerja oh 0.0833 Rp 136,000.00 Rp 11,333.33
2 Tukang kayu oh 0.1667 Rp 145,000.00 Rp 24,166.67
3 Kepala tukang oh 0.0333 Rp 155,000.00 Rp 5,166.67
4 Mandor oh 0.0167 Rp 155,000.00 Rp 2,583.33
Jumlah harga persatuan pekerjaan Rp 293,250.00
Biaya umum dan Keuntungan 10% Rp 29,325.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 322,575.00
45 1 m' Pekerjaan Hospital curtain & Rail komplit set (Medical Track). A.4.6.2.11. (modifikasi) Rp 1,163,662.50
Bahan :
1 Hospital curtain & Rail komplit set (Medical Track)
- Rail RS Komplit set m' 1.0000 Rp 750,000.00 Rp 750,000.00
- Kain menggunakan Type Polyester FN Lebar 2.8 m Warna Cream dan Putih m' 1.0000 Rp 235,000.00 Rp 235,000.00
- Kain Polyester menggunakan type jahitan mata ayam ls 1.0000 Rp 10,000.00 Rp 10,000.00
Tenaga Kerja :
1 Pekerja oh 0.0200 Rp 136,000.00 Rp 2,720.00
2 Tukang kayu oh 0.2000 Rp 145,000.00 Rp 29,000.00
3 Kepala tukang oh 0.2000 Rp 155,000.00 Rp 31,000.00
4 Mandor oh 0.0010 Rp 155,000.00 Rp 155.00
Jumlah harga persatuan pekerjaan Rp 1,057,875.00
Biaya umum dan Keuntungan 10% Rp 105,787.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,163,662.50
46 1 m' Pemasangan Saluran U-Ditch 30x40, mutu beton K-350 P.15.a 1 Rp 327,855.00
Bahan :
1 Saluran U-Ditch 30 x 40 cm @panjang = 1,2 m bh 0.8500 Rp 315,000.00 Rp 267,750.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.2000 Rp 136,000.00 Rp 27,200.00
2 Mandor L.04 oh 0.0200 Rp 155,000.00 Rp 3,100.00
Jumlah harga persatuan pekerjaan Rp 298,050.00

Analisa Harga Satuan Arsitektur - page 73 of 212


No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan
Biaya umum dan Keuntungan 10% Rp 29,805.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 327,855.00
47 1 m' Pemasangan Saluran U-Ditch 40x60, mutu beton K-350 P.15.a 1 Rp 486,805.00
Bahan :
1 Saluran U-Ditch 30 x 40 cm @panjang = 1,2 m bh 0.8500 Rp 485,000.00 Rp 412,250.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.2000 Rp 136,000.00 Rp 27,200.00
2 Mandor L.04 oh 0.0200 Rp 155,000.00 Rp 3,100.00
Jumlah harga persatuan pekerjaan Rp 442,550.00
Biaya umum dan Keuntungan 10% Rp 44,255.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 486,805.00
48 1 m' Pemasangan Saluran U-Ditch 60x80, mutu beton K-350 P.15.a 1 Rp 646,690.00
Bahan :
1 Saluran U-Ditch 60 x 80 cm @panjang = 1,2 m bh 0.8500 Rp 656,000.00 Rp 557,600.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.2000 Rp 136,000.00 Rp 27,200.00
2 Mandor L.04 oh 0.0200 Rp 155,000.00 Rp 3,100.00
Jumlah harga persatuan pekerjaan Rp 587,900.00
Biaya umum dan Keuntungan 10% Rp 58,790.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 646,690.00
49 1 Unit Pengadaan dan pemasangan Buis Beton dia. 120, tinggi 50 cm P.15.a 1 Rp 419,017.50
Bahan :
1 Buis Beton diameter 120 cm, tinggi 50 cm bh 0.8500 Rp 412,500.00 Rp 350,625.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.2000 Rp 136,000.00 Rp 27,200.00
2 Mandor L.04 oh 0.0200 Rp 155,000.00 Rp 3,100.00
Jumlah harga persatuan pekerjaan Rp 380,925.00
Biaya umum dan Keuntungan 10% Rp 38,092.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 419,017.50
50 1 m² PekerjaanBase Dumper : SS-304 1200 mm x 200 mm x 1.2 mm Rp 501,193.00
Bahan :
1 Base Dumper : SS-304 1200 mm x 200 mm x 1.2 mm m² 1.0000 Rp 379,710.00 Rp 379,710.00
Tenaga Kerja :
1 Pekerja oh 0.3500 Rp 136,000.00 Rp 47,600.00
2 Tukang kayu oh 0.1750 Rp 145,000.00 Rp 25,375.00
3 Kepala tukang oh 0.0170 Rp 155,000.00 Rp 2,635.00
4 Mandor oh 0.0020 Rp 155,000.00 Rp 310.00
Jumlah harga persatuan pekerjaan Rp 455,630.00
Biaya umum dan Keuntungan 10% Rp 45,563.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 501,193.00
51 1 m² Flooring : Vinyl, Scretch Resistance Anti Static 3.0 mm x 2 m x 20 m Rp 1,286,811.90
Bahan :
1 Flooring : Vinyl, Scretch Resistance Anti Static 3.0 mm x 2 m x 20 m, merk LG Medistep Medistudio
m² 1.0000 Rp 1,012,544.00 Rp 1,012,544.00
2 Semen kg 8.0000 Rp 1,500.00 Rp 12,000.00
3 Self leveling floor 3-10 mm zak 0.0720 Rp 310,000.00 Rp 22,320.00
4 Lem/adhesive ltr 0.3500 Rp 135,000.00 Rp 47,250.00
5 Welding, polish ls 1.0000 Rp 30,000.00 Rp 30,000.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.1500 Rp 136,000.00 Rp 20,400.00
2 Tukang L.02 oh 0.1500 Rp 145,000.00 Rp 21,750.00
3 Kepala tukang L.03 oh 0.0150 Rp 155,000.00 Rp 2,325.00
4 Mandor L.04 oh 0.0080 Rp 155,000.00 Rp 1,240.00
Jumlah harga persatuan pekerjaan Rp 1,169,829.00
Biaya umum dan Keuntungan 10% Rp 116,982.90
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,286,811.90
52 1 m² PIR INTERIOR PANEL (Color 0.45 mm BMT + SS304 2B) T. 5CM - Dinding Rp 3,097,952.00
Bahan :
1 PIR INTERIOR PANEL (Color 0.45 mm BMT + SS304 2B) T. 5CM - Dinding (ZELTECH) m² 1.0000 Rp 2,740,400.00 Rp 2,740,400.00
Tenaga Kerja :
1 Pekerja oh 0.3500 Rp 136,000.00 Rp 47,600.00
2 Tukang kayu oh 0.1750 Rp 145,000.00 Rp 25,375.00
3 Kepala tukang oh 0.0170 Rp 155,000.00 Rp 2,635.00
4 Mandor oh 0.0020 Rp 155,000.00 Rp 310.00
Jumlah harga persatuan pekerjaan Rp 2,816,320.00
Biaya umum dan Keuntungan 10% Rp 281,632.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 3,097,952.00
53 1 m² PIR INTERIOR PANEL (Color 0.45 mm BMT + SS304 2B) T. 5CM - Plafond (ZELTECH) Rp 3,039,080.00
Bahan : A.4.5.1.7.
1 PIR INTERIOR PANEL (Color 0.45 mm BMT + SS304 2B) T. 5CM - Plafond (ZELTECH) m² 1.0000 Rp 2,740,400.00 Rp 2,740,400.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.1000 Rp 136,000.00 Rp 13,600.00
2 Tukang L.02 oh 0.0500 Rp 145,000.00 Rp 7,250.00
3 Kepala tukang L.03 oh 0.0050 Rp 155,000.00 Rp 775.00
4 Mandor L.04 oh 0.0050 Rp 155,000.00 Rp 775.00
Jumlah harga persatuan pekerjaan Rp 2,762,800.00
Biaya umum dan Keuntungan 10% Rp 276,280.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 3,039,080.00
54 1 m² Wall Glass Printing Tempered 10mm + Aksessories Rp 5,663,709.15
Bahan :
1 Wall Glass Printing Tempered 10mm + Aksessories m² 1.1000 Rp 4,641,000.00 Rp 5,105,100.00
Tenaga Kerja :

Analisa Harga Satuan Arsitektur - page 74 of 212


No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan
1 Pekerja oh 0.0250 Rp 136,000.00 Rp 3,400.00
2 Tukang oh 0.2500 Rp 145,000.00 Rp 36,250.00
3 Kepala tukang oh 0.0250 Rp 155,000.00 Rp 3,875.00
4 Mandor oh 0.0013 Rp 155,000.00 Rp 201.50
Jumlah harga persatuan pekerjaan Rp 5,148,826.50
Biaya umum dan Keuntungan 10% Rp 514,882.65
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 5,663,709.15
PEKERJAAN PELAPIS LANTAI
1 1 m² Pemasangan lantai homogenius tile 20 x 60 cm (cutting size) A.4.4.3.13 modifikasi Rp 384,351.00
Bahan :
1 Lantai homogenius tile 20 x 60 cm - Polished cutting size bh 8.7500 Rp 27,600.00 Rp 241,500.00
2 Semen kg 9.6000 Rp 1,500.00 Rp 14,400.00
3 Pasir pasang m³ 0.0450 Rp 200,000.00 Rp 9,000.00
4 Semen warna kg 1.5000 Rp 20,500.00 Rp 30,750.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.2400 Rp 136,000.00 Rp 32,640.00
2 Tukang batu L.02 oh 0.1200 Rp 145,000.00 Rp 17,400.00
3 Kepala tukang L.03 oh 0.0120 Rp 155,000.00 Rp 1,860.00
4 Mandor L.04 oh 0.0120 Rp 155,000.00 Rp 1,860.00
Jumlah harga persatuan pekerjaan Rp 349,410.00
Biaya umum dan Keuntungan 10% Rp 34,941.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 384,351.00
2 1 m² Pemasangan lantai homogenius tile 60 x 60 cm (Polished) A.4.4.3.13 modifikasi Rp 384,351.00
Bahan :
1 Lantai homogenius tile 60 x 60 cm (Polished) bh 2.9167 Rp 82,800.00 Rp 241,500.00
2 Semen kg 9.6000 Rp 1,500.00 Rp 14,400.00
3 Pasir pasang m³ 0.0450 Rp 200,000.00 Rp 9,000.00
4 Semen warna kg 1.5000 Rp 20,500.00 Rp 30,750.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.2400 Rp 136,000.00 Rp 32,640.00
2 Tukang batu L.02 oh 0.1200 Rp 145,000.00 Rp 17,400.00
3 Kepala tukang L.03 oh 0.0120 Rp 155,000.00 Rp 1,860.00
4 Mandor L.04 oh 0.0120 Rp 155,000.00 Rp 1,860.00
Jumlah harga persatuan pekerjaan Rp 349,410.00
Biaya umum dan Keuntungan 10% Rp 34,941.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 384,351.00
3 1 m² Pemasangan lantai homogenius tile 60 x 60 cm (Unpolished) A.4.4.3.13 modifikasi Rp 378,576.00
Bahan :
1 Lantai homogenius tile 60 x 60 cm (Unpolished) bh 2.9167 Rp 81,000.00 Rp 236,250.00
2 Semen kg 9.6000 Rp 1,500.00 Rp 14,400.00
3 Pasir pasang m³ 0.0450 Rp 200,000.00 Rp 9,000.00
4 Semen warna kg 1.5000 Rp 20,500.00 Rp 30,750.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.2400 Rp 136,000.00 Rp 32,640.00
2 Tukang batu L.02 oh 0.1200 Rp 145,000.00 Rp 17,400.00
3 Kepala tukang L.03 oh 0.0120 Rp 155,000.00 Rp 1,860.00
4 Mandor L.04 oh 0.0120 Rp 155,000.00 Rp 1,860.00
Jumlah harga persatuan pekerjaan Rp 344,160.00
Biaya umum dan Keuntungan 10% Rp 34,416.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 378,576.00
4 1 m² Pemasangan lantai keramik tile 60 x 60 cm (kasar) A.4.4.3.13 modifikasi Rp 309,276.00
Bahan :
1 Lantai keramik tile 60 x 60 cm (Unpolished) bh 2.9167 Rp 59,400.00 Rp 173,250.00
2 Semen kg 9.6000 Rp 1,500.00 Rp 14,400.00
3 Pasir pasang m³ 0.0450 Rp 200,000.00 Rp 9,000.00
4 Semen warna kg 1.5000 Rp 20,500.00 Rp 30,750.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.2400 Rp 136,000.00 Rp 32,640.00
2 Tukang batu L.02 oh 0.1200 Rp 145,000.00 Rp 17,400.00
3 Kepala tukang L.03 oh 0.0120 Rp 155,000.00 Rp 1,860.00
4 Mandor L.04 oh 0.0120 Rp 155,000.00 Rp 1,860.00
Jumlah harga persatuan pekerjaan Rp 281,160.00
Biaya umum dan Keuntungan 10% Rp 28,116.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 309,276.00
5 1 m² Pemasangan lantai homogenius tile 30 x 60 cm dengan step noising tangga
A.4.4.3.13 modifikasi Rp 366,201.00
Bahan :
1 Lantai homogenius tile 30 x 60 cm + step noising tangga bh 5.5556 Rp 40,500.00 Rp 225,000.00
2 Semen kg 9.6000 Rp 1,500.00 Rp 14,400.00
3 Pasir pasang m³ 0.0450 Rp 200,000.00 Rp 9,000.00
4 Semen warna kg 1.5000 Rp 20,500.00 Rp 30,750.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.2400 Rp 136,000.00 Rp 32,640.00
2 Tukang batu L.02 oh 0.1200 Rp 145,000.00 Rp 17,400.00
3 Kepala tukang L.03 oh 0.0120 Rp 155,000.00 Rp 1,860.00
4 Mandor L.04 oh 0.0120 Rp 155,000.00 Rp 1,860.00
Jumlah harga persatuan pekerjaan Rp 332,910.00
Biaya umum dan Keuntungan 10% Rp 33,291.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 366,201.00
6 1 m² Pemasangan Floor Hardener A.4.4.3.61. Rp 57,761.00
Bahan :
1 Drymix Pemasangan Floor Hardener @ 25 kg kg 5.0000 Rp 3,200.00 Rp 16,000.00

Analisa Harga Satuan Arsitektur - page 75 of 212


No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan
Tenaga Kerja :
1 Pekerja L.01 oh 0.1200 Rp 136,000.00 Rp 16,320.00
2 Tukang batu L.02 oh 0.1200 Rp 145,000.00 Rp 17,400.00
3 Kepala tukang L.03 oh 0.0120 Rp 155,000.00 Rp 1,860.00
4 Mandor L.04 oh 0.0060 Rp 155,000.00 Rp 930.00
Jumlah harga persatuan pekerjaan Rp 52,510.00
Biaya umum dan Keuntungan 10% Rp 5,251.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 57,761.00
7 1 m' Pemasangan Step Noising keramik 5 x 20 cm A.4.4.3.51. Modifikasi Rp 73,958.50
Bahan :
1 Step Noising kermaik 5 x 20 cm bh 5.2500 Rp 7,500.00 Rp 39,375.00
2 Semen kg 0.9300 Rp 1,500.00 Rp 1,395.00
3 Pasir pasang m³ 0.0018 Rp 200,000.00 Rp 360.00
4 Semen warna kg 0.2900 Rp 20,500.00 Rp 5,945.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.0900 Rp 136,000.00 Rp 12,240.00
2 Tukang batu L.02 oh 0.0450 Rp 145,000.00 Rp 6,525.00
3 Kepala tukang L.03 oh 0.0045 Rp 155,000.00 Rp 697.50
4 Mandor L.04 oh 0.0045 Rp 155,000.00 Rp 697.50
Jumlah harga persatuan pekerjaan Rp 67,235.00
Biaya umum dan Keuntungan 10% Rp 6,723.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 73,958.50
8 1 m² Pemasangan lantai vinyl sheet A.4.4.3.58. Rp 470,976.00
Bahan :
1 Lantai vinyl sheet m² 1.0000 Rp 270,875.00 Rp 270,875.00
2 Semen kg 8.0000 Rp 1,500.00 Rp 12,000.00
3 Self leveling floor 3-10 mm zak 0.0720 Rp 310,000.00 Rp 22,320.00
4 Lem/adhesive ltr 0.3500 Rp 135,000.00 Rp 47,250.00
5 Welding, polish ls 1.0000 Rp 30,000.00 Rp 30,000.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.1500 Rp 136,000.00 Rp 20,400.00
2 Tukang L.02 oh 0.1500 Rp 145,000.00 Rp 21,750.00
3 Kepala tukang L.03 oh 0.0150 Rp 155,000.00 Rp 2,325.00
4 Mandor L.04 oh 0.0080 Rp 155,000.00 Rp 1,240.00
Jumlah harga persatuan pekerjaan Rp 428,160.00
Biaya umum dan Keuntungan 10% Rp 42,816.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 470,976.00
9 1 m² Pasangan lantai karpet + underlayer A.4.4.3.43. Rp 446,022.50
Bahan :
1 Lantai karpet (armstrong) m² 1.0300 Rp 233,750.00 Rp 240,762.50
2 Underlayer bawah karpet m² 1.0300 Rp 63,750.00 Rp 65,662.50
3 Lem kg 0.3500 Rp 135,000.00 Rp 47,250.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.1700 Rp 136,000.00 Rp 23,120.00
2 Tukang kayu L.02 oh 0.1700 Rp 145,000.00 Rp 24,650.00
3 Kepala tukang L.03 oh 0.0170 Rp 155,000.00 Rp 2,635.00
4 Mandor L.04 oh 0.0090 Rp 155,000.00 Rp 1,395.00
Jumlah harga persatuan pekerjaan Rp 405,475.00
Biaya umum dan Keuntungan 10% Rp 40,547.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 446,022.50
10 1 m² Pemasangan waterproofing coating Analisa lapangan Rp 83,036.25
Bahan :
1 Waterproofing coating Elastomeric Acrylic/ Terpasang (Fosroc) kg 0.3500 Rp 63,750.00 Rp 22,312.50
2 Alat bantu ls 1.0000 Rp 6,375.00 Rp 6,375.00
Tenaga Kerja :
1 Pekerja oh 0.1500 Rp 136,000.00 Rp 20,400.00
2 Tukang cat oh 0.1500 Rp 145,000.00 Rp 21,750.00
3 Kepala tukang oh 0.0150 Rp 155,000.00 Rp 2,325.00
4 Mandor oh 0.0150 Rp 155,000.00 Rp 2,325.00
Jumlah harga persatuan pekerjaan Rp 75,487.50
Biaya umum dan Keuntungan 10% Rp 7,548.75
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 83,036.25
11 1 m² Pemasangan waterproofing membran sheet Analisa lapangan Rp 151,791.68
Bahan :
1 Waterproofing Membrane sheet (Fosroc) m² 1.0200 Rp 85,000.00 Rp 86,700.00
2 Primer kg 0.0300 Rp 19,470.00 Rp 584.10
Tenaga Kerja :
1 Pekerja oh 0.1667 Rp 136,000.00 Rp 22,666.67
2 Tukang cat oh 0.1667 Rp 145,000.00 Rp 24,166.67
3 Kepala tukang oh 0.0167 Rp 155,000.00 Rp 2,583.33
4 Mandor oh 0.0083 Rp 155,000.00 Rp 1,291.67
Jumlah harga persatuan pekerjaan Rp 137,992.43
Biaya umum dan Keuntungan 10% Rp 13,799.24
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 151,791.68
12 1 m² Pemasangan paving block tebal 8 cm A.4.4.3.64. Rp 348,151.65
Bahan :
1 Paving block, tebal 8 cm natural K-300 m² 1.0100 Rp 145,000.00 Rp 146,450.00
2 Pasir beton m3 0.0800 Rp 270,000.00 Rp 21,600.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.5000 Rp 136,000.00 Rp 68,000.00
2 Tukang batu L.02 oh 0.5000 Rp 145,000.00 Rp 72,500.00

Analisa Harga Satuan Arsitektur - page 76 of 212


No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan
3 Kepala tukang L.03 oh 0.0500 Rp 155,000.00 Rp 7,750.00
4 Mandor L.04 oh 0.0013 Rp 155,000.00 Rp 201.50
Jumlah harga persatuan pekerjaan Rp 316,501.50
Biaya umum dan Keuntungan 10% Rp 31,650.15
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 348,151.65
13 1 m² Pemasangan Pelapis Lantai Plaza Rp 284,093.02
Bahan :
1 Batu Andesite m² 1.0000 Rp 160,000.00 Rp 160,000.00
2 Kerikil m3 0.2143 Rp 8,000.00 Rp 1,714.29
3 Homogeneous Tile (polished) m² 0.0115 Rp 265,000.00 Rp 3,042.09
4 Pasir pasang m3 0.0450 Rp 200,000.00 Rp 9,000.00
5 Semen m3 1.5000 Rp 20,500.00 Rp 30,750.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.2400 Rp 136,000.00 Rp 32,640.00
2 Tukang batu L.02 oh 0.1200 Rp 145,000.00 Rp 17,400.00
3 Kepala tukang L.03 oh 0.0120 Rp 155,000.00 Rp 1,860.00
4 Mandor L.04 oh 0.0120 Rp 155,000.00 Rp 1,860.00
Jumlah harga persatuan pekerjaan Rp 258,266.38
Biaya umum dan Keuntungan 10% Rp 25,826.64
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 284,093.02
PEKERJAAN PLAFOND
1 1 m² Pemasangan Langit-langit ( Plafond ) Gypsum board uk. ( 120 x 240 x 9)mmm, tebal 9mm Rp 67,793.00
Bahan : A.4.5.1.7.
1 Gypsum board 1200 mm x 2400 mm x 9 mm lbr 0.3640 Rp 70,000.00 Rp 25,480.00
2 Paku ramset+misiu kg 0.1100 Rp 125,000.00 Rp 13,750.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.1000 Rp 136,000.00 Rp 13,600.00
2 Tukang L.02 oh 0.0500 Rp 145,000.00 Rp 7,250.00
3 Kepala tukang L.03 oh 0.0050 Rp 155,000.00 Rp 775.00
4 Mandor L.04 oh 0.0050 Rp 155,000.00 Rp 775.00
Jumlah harga persatuan pekerjaan Rp 61,630.00
Biaya umum dan Keuntungan 10% Rp 6,163.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 67,793.00
2 1 m² Pemasangan plafond GRC board T=4mm dengan rangka metal furing A.4.5.1.7. Rp 68,593.80
Bahan :
1 GRC 1200 mm x 2400 mm x 4 mm lbr 0.3640 Rp 72,000.00 Rp 26,208.00
2 Paku ramset+misiu kg 0.1100 Rp 125,000.00 Rp 13,750.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.1000 Rp 136,000.00 Rp 13,600.00
2 Tukang L.02 oh 0.0500 Rp 145,000.00 Rp 7,250.00
3 Kepala tukang L.03 oh 0.0050 Rp 155,000.00 Rp 775.00
4 Mandor L.04 oh 0.0050 Rp 155,000.00 Rp 775.00
Jumlah harga persatuan pekerjaan Rp 62,358.00
Biaya umum dan Keuntungan 10% Rp 6,235.80
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 68,593.80
3 1 m² Pemasangan rangka besi hollow galvalum 40.40. 0.45 mm, modul 60x60cm untuk plafond Rp 185,407.75
Bahan : A.4.2.1.21.
1 Rangka hollow 40.40.0.45 mm m' 4.0000 Rp 14,250.00 Rp 57,000.00
2 Assesories (perkuatan, dll) % 0.3500 Rp 14,250.00 Rp 4,987.50
Tenaga Kerja :
1 Pekerja L.01 oh 0.3500 Rp 136,000.00 Rp 47,600.00
2 Tukang L.02 oh 0.3500 Rp 145,000.00 Rp 50,750.00
3 Kepala tukang L.03 oh 0.0350 Rp 155,000.00 Rp 5,425.00
4 Mandor L.04 oh 0.0180 Rp 155,000.00 Rp 2,790.00
Jumlah harga persatuan pekerjaan Rp 168,552.50
Biaya umum dan Keuntungan 10% Rp 16,855.25
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 185,407.75
4 1 m' Pemasangan List alumunium profil U 2 cm A.4.5.1.10. Modifikasi Rp 57,244.00
Bahan :
1 List alumunium profil U 2 cm m' 1.0500 Rp 35,000.00 Rp 36,750.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.0500 Rp 136,000.00 Rp 6,800.00
2 Tukang L.02 oh 0.0500 Rp 145,000.00 Rp 7,250.00
3 Kepala tukang L.03 oh 0.0050 Rp 155,000.00 Rp 775.00
4 Mandor L.04 oh 0.0030 Rp 155,000.00 Rp 465.00
Jumlah harga persatuan pekerjaan Rp 52,040.00
Biaya umum dan Keuntungan 10% Rp 5,204.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 57,244.00
5 1 m' Pemasangan List profil gypsum 5 cm A.4.5.1.10. Modifikasi Rp 29,127.34
Bahan :
1 List profil gypsum 5 cm m' 1.0500 Rp 10,630.00 Rp 11,161.50
2 Peralatan bantu ls 0.0500 Rp 558.08 Rp 27.90
Tenaga Kerja :
1 Pekerja L.01 oh 0.0500 Rp 136,000.00 Rp 6,800.00
2 Tukang L.02 oh 0.0500 Rp 145,000.00 Rp 7,250.00
3 Kepala tukang L.03 oh 0.0050 Rp 155,000.00 Rp 775.00
4 Mandor L.04 oh 0.0030 Rp 155,000.00 Rp 465.00
Jumlah harga persatuan pekerjaan Rp 26,479.40
Biaya umum dan Keuntungan 10% Rp 2,647.94
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 29,127.34
6 1 m² Pemasangan plafond akustik tile uk. 60 x 120 cm Analisa lapangan Rp 328,350.00

Analisa Harga Satuan Arsitektur - page 77 of 212


No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bahan dan upah :
Plafond akustik tile uk. 600 x 1200 x 15 mm (knauf) m² 1.0000 Rp 298,500.00 Rp 298,500.00
- Edge/ design : Tegular 24 edge
- Pattern/ surface : Smooth surface with small hole
- Suspension system : System C (lay in system)
- Rangka : T-Grid 24
- Warna : Putih RAL 9010
- Upah pasang dan material bantu
Jumlah harga persatuan pekerjaan Rp 298,500.00
Biaya umum dan Keuntungan 10% Rp 29,850.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 328,350.00
7 1 m² Pemasangan plafond metal ceilling linier Analisa lapangan Rp 771,045.00
Bahan :
1 AL Panel 200F thick 0.7mm m' 5.0000 Rp 89,000.00 Rp 445,000.00
2 Fe Carrier @5m pcs 0.2000 Rp 200,000.00 Rp 40,000.00
3 Panel splice pcs 0.3000 Rp 27,000.00 Rp 8,100.00
4 Edge profil type L STD cotton pcs 0.1500 Rp 77,000.00 Rp 11,550.00
5 Hollo 40/40 m' 0.8500 Rp 50,000.00 Rp 42,500.00
6 Paku peluru + siku penggantung (steel bracket) pcs 2.1400 Rp 15,000.00 Rp 32,100.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.4000 Rp 136,000.00 Rp 54,400.00
2 Tukang L.02 oh 0.4000 Rp 145,000.00 Rp 58,000.00
3 Kepala tukang L.03 oh 0.0400 Rp 155,000.00 Rp 6,200.00
4 Mandor L.04 oh 0.0200 Rp 155,000.00 Rp 3,100.00
Jumlah harga persatuan pekerjaan Rp 700,950.00
Biaya umum dan Keuntungan 10% Rp 70,095.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 771,045.00
8 1 m' Pemasangan drop ceilling gypsum Analisa lapangan Rp 89,989.35
Bahan : A.4.5.1.7.
1 Gypsum board 1200 mm x 2400 mm x 9 mm A.4.2.1.21. lbr 0.1092 Rp 70,000.00 Rp 7,644.00
2 Paku ramset+misiu kg 0.0330 Rp 125,000.00 Rp 4,125.00
3 Rangka metal hollow 40.40 mm m' 1.2000 Rp 14,250.00 Rp 17,100.00
4 Assesories (perkuatan, las dll) ls 1.0000 Rp 14,250.00 Rp 14,250.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.1350 Rp 136,000.00 Rp 18,360.00
2 Tukang L.02 oh 0.1200 Rp 145,000.00 Rp 17,400.00
3 Kepala tukang L.03 oh 0.0120 Rp 155,000.00 Rp 1,860.00
4 Mandor L.04 oh 0.0069 Rp 155,000.00 Rp 1,069.50
Jumlah harga persatuan pekerjaan Rp 81,808.50
Biaya umum dan Keuntungan 10% Rp 8,180.85
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 89,989.35
PEKERJAAN SANITARY
1 1 bh Pemasangan kloset duduk lengkap dengan aksesoris A.5.1.1.1. Rp 5,816,200.50
Bahan :
Kloset duduk lengkap dengan aksesoris TOTO Type CW 668 PJ/ SW
1 bh 1.0000 Rp 4,750,000.00 Rp 4,750,000.00
668 J, Roca
2 Perlengkapan alat bantu ls 1.0000 Rp 285,000.00 Rp 285,000.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.5000 Rp 136,000.00 Rp 68,000.00
2 Tukang batu L.02 oh 1.1000 Rp 145,000.00 Rp 159,500.00
3 Kepala tukang L.03 oh 0.0010 Rp 155,000.00 Rp 155.00
4 Mandor L.04 oh 0.1600 Rp 155,000.00 Rp 24,800.00
Jumlah harga persatuan pekerjaan Rp 5,287,455.00
Biaya umum dan Keuntungan 10% Rp 528,745.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 5,816,200.50
2 1 bh Pemasangan kloset jongkok lengkap dengan aksesoris A.5.1.1.2. Rp 952,624.98
Bahan :
1 Kloset jongkok lengkap dengan aksesoris bh 1.0000 Rp 458,880.00 Rp 458,880.00
2 Pemasangan Dinding Bata Merah 1/2 Batu ,Campuran 1 SP : 3 PP m² 0.0360 Rp 155,353.00 Rp 5,592.71
Tenaga Kerja :
1 Pekerja L.01 oh 1.0000 Rp 136,000.00 Rp 136,000.00
2 Tukang batu L.02 oh 1.5000 Rp 145,000.00 Rp 217,500.00
3 Kepala tukang L.03 oh 0.1500 Rp 155,000.00 Rp 23,250.00
4 Mandor L.04 oh 0.1600 Rp 155,000.00 Rp 24,800.00
Jumlah harga persatuan pekerjaan Rp 866,022.71
Biaya umum dan Keuntungan 10% Rp 86,602.27
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 952,624.98
3 1 bh Pemasangan wastafel gantung lengkap dengan aksesoris A.5.1.1.5. Rp 1,487,904.00
Bahan :
1 Wastafel gantung lengkap dengan aksesoris bh 1.0000 Rp 935,640.00 Rp 935,640.00
2 Semen portland kg 6.0000 Rp 1,500.00 Rp 9,000.00
3 Pasir pasang m3 0.0100 Rp 200,000.00 Rp 2,000.00
Tenaga Kerja :
1 Pekerja L.01 oh 1.2000 Rp 136,000.00 Rp 163,200.00
2 Tukang batu L.02 oh 1.4500 Rp 145,000.00 Rp 210,250.00
3 Kepala tukang L.03 oh 0.1500 Rp 155,000.00 Rp 23,250.00
4 Mandor L.04 oh 0.0600 Rp 155,000.00 Rp 9,300.00
Jumlah harga persatuan pekerjaan Rp 1,352,640.00
Biaya umum dan Keuntungan 10% Rp 135,264.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,487,904.00
4 1 bh Pemasangan Wastafel Undercounter lengkap dengan aksesoris A.5.1.1.5. Rp 2,737,130.00

Analisa Harga Satuan Arsitektur - page 78 of 212


No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bahan :
1 Wastafel undercounter lengkap dengan aksesoris bh 1.0000 Rp 1,944,000.00 Rp 1,944,000.00
2 Semen portland kg 6.0000 Rp 1,500.00 Rp 9,000.00
3 Pasir pasang m3 0.0100 Rp 200,000.00 Rp 2,000.00
Tenaga Kerja :
1 Pekerja L.01 oh 1.0000 Rp 136,000.00 Rp 136,000.00
2 Tukang batu L.02 oh 1.5000 Rp 145,000.00 Rp 217,500.00
3 Kepala tukang L.03 oh 1.0000 Rp 155,000.00 Rp 155,000.00
4 Mandor L.04 oh 0.1600 Rp 155,000.00 Rp 24,800.00
Jumlah harga persatuan pekerjaan Rp 2,488,300.00
Biaya umum dan Keuntungan 10% Rp 248,830.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 2,737,130.00
5 1 m' Cove ligth wastafel MDF board Analisa lapangan Rp 430,901.90
Bahan :
1 Multiplek lapis HPL m² 0.4000 Rp 920,260.00 Rp 368,104.00
Tenaga Kerja :
1 Pekerja oh 0.0500 Rp 136,000.00 Rp 6,800.00
2 Tukang batu oh 0.1000 Rp 145,000.00 Rp 14,500.00
3 Kepala tukang oh 0.0100 Rp 155,000.00 Rp 1,550.00
4 Mandor oh 0.0050 Rp 155,000.00 Rp 775.00
Jumlah harga persatuan pekerjaan Rp 391,729.00
Biaya umum dan Keuntungan 10% Rp 39,172.90
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 430,901.90
6 1 m² Kaca cermin A.4.6.2.20. Rp 474,402.50
Bahan :
1 Kaca cermin m² 1.1000 Rp 367,200.00 Rp 403,920.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.0150 Rp 136,000.00 Rp 2,040.00
2 Tukang L.02 oh 0.1500 Rp 145,000.00 Rp 21,750.00
3 Kepala tukang L.03 oh 0.0150 Rp 155,000.00 Rp 2,325.00
4 Mandor L.04 oh 0.0080 Rp 155,000.00 Rp 1,240.00
Jumlah harga persatuan pekerjaan Rp 431,275.00
Biaya umum dan Keuntungan 10% Rp 43,127.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 474,402.50
7 1 bh Pemasangan jet washer A.5.1.1.35. Rp 395,254.75
Bahan :
1 Jet washer bh 1.0000 Rp 292,800.00 Rp 292,800.00
2 Sealtape bh 0.0250 Rp 7,500.00 Rp 187.50
Tenaga Kerja :
1 Pekerja L.01 oh 0.0100 Rp 136,000.00 Rp 1,360.00
2 Tukang L.02 oh 0.4000 Rp 145,000.00 Rp 58,000.00
3 Kepala tukang L.03 oh 0.0400 Rp 155,000.00 Rp 6,200.00
4 Mandor L.04 oh 0.0050 Rp 155,000.00 Rp 775.00
Jumlah harga persatuan pekerjaan Rp 359,322.50
Biaya umum dan Keuntungan 10% Rp 35,932.25
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 395,254.75
8 1 bh Pemasangan Kran dinding A.5.1.1.35. Rp 304,438.75
Bahan :
1 Kran dinding bh 1.0000 Rp 210,240.00 Rp 210,240.00
2 Sealtape bh 0.0250 Rp 7,500.00 Rp 187.50
Tenaga Kerja :
1 Pekerja L.01 oh 0.0100 Rp 136,000.00 Rp 1,360.00
2 Tukang L.02 oh 0.4000 Rp 145,000.00 Rp 58,000.00
3 Kepala tukang L.03 oh 0.0400 Rp 155,000.00 Rp 6,200.00
4 Mandor L.04 oh 0.0050 Rp 155,000.00 Rp 775.00
Jumlah harga persatuan pekerjaan Rp 276,762.50
Biaya umum dan Keuntungan 10% Rp 27,676.25
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 304,438.75
9 1 bh Soap holder Analisa lapangan Rp 476,808.75
Bahan :
1 Soap holder bh 1.0000 Rp 374,400.00 Rp 374,400.00
Tenaga Kerja :
1 Pekerja oh 0.1250 Rp 136,000.00 Rp 17,000.00
2 Tukang batu oh 0.2500 Rp 145,000.00 Rp 36,250.00
3 Kepala tukang oh 0.0250 Rp 155,000.00 Rp 3,875.00
4 Mandor oh 0.0125 Rp 155,000.00 Rp 1,937.50
Jumlah harga persatuan pekerjaan Rp 433,462.50
Biaya umum dan Keuntungan 10% Rp 43,346.25
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 476,808.75
10 1 bh Soap dispenser Analisa lapangan Rp 244,290.75
Bahan :
1 Soap dispenser bh 1.0000 Rp 163,020.00 Rp 163,020.00
Tenaga Kerja :
1 Pekerja oh 0.1250 Rp 136,000.00 Rp 17,000.00
2 Tukang batu oh 0.2500 Rp 145,000.00 Rp 36,250.00
3 Kepala tukang oh 0.0250 Rp 155,000.00 Rp 3,875.00
4 Mandor oh 0.0125 Rp 155,000.00 Rp 1,937.50
Jumlah harga persatuan pekerjaan Rp 222,082.50
Biaya umum dan Keuntungan 10% Rp 22,208.25
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 244,290.75
11 1 bh Tisue holder Analisa lapangan Rp 586,632.75

Analisa Harga Satuan Arsitektur - page 79 of 212


No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan
Bahan :
1 Tisue holder bh 1.0000 Rp 474,240.00 Rp 474,240.00
Tenaga Kerja :
1 Pekerja oh 0.1250 Rp 136,000.00 Rp 17,000.00
2 Tukang batu oh 0.2500 Rp 145,000.00 Rp 36,250.00
3 Kepala tukang oh 0.0250 Rp 155,000.00 Rp 3,875.00
4 Mandor oh 0.0125 Rp 155,000.00 Rp 1,937.50
Jumlah harga persatuan pekerjaan Rp 533,302.50
Biaya umum dan Keuntungan 10% Rp 53,330.25
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 586,632.75
12 1 bh Shower dan kran lengkap dengan aksesories A.5.1.1.35. Rp 1,609,654.75
Bahan :
1 Shower lengkap dengan aksesories bh 1.0000 Rp 1,396,800.00 Rp 1,396,800.00
2 Sealtape bh 0.0250 Rp 7,500.00 Rp 187.50
Tenaga Kerja :
1 Pekerja oh 0.0100 Rp 136,000.00 Rp 1,360.00
2 Tukang oh 0.4000 Rp 145,000.00 Rp 58,000.00
3 Kepala tukang oh 0.0400 Rp 155,000.00 Rp 6,200.00
4 Mandor oh 0.0050 Rp 155,000.00 Rp 775.00
Jumlah harga persatuan pekerjaan Rp 1,463,322.50
Biaya umum dan Keuntungan 10% Rp 146,332.25
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,609,654.75
13 1 bh Pemasangan floor drain A.5.1.1.36 Rp 374,819.50
Bahan :
1 Floor Drain bh 1.0000 Rp 322,560.00 Rp 322,560.00
Tenaga Kerja :
1 Pekerja oh 0.0100 Rp 136,000.00 Rp 1,360.00
2 Tukang oh 0.1000 Rp 145,000.00 Rp 14,500.00
3 Kepala tukang oh 0.0100 Rp 155,000.00 Rp 1,550.00
4 Mandor oh 0.0050 Rp 155,000.00 Rp 775.00
Jumlah harga persatuan pekerjaan Rp 340,745.00
Biaya umum dan Keuntungan 10% Rp 34,074.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 374,819.50
14 1 bh Pasangan Sloof zink + kran lengkap dengan aksesoris A.5.1.1.33. Rp 7,449,370.50
Bahan :
1 Sloof zink + kran lengkap dengan aksesoris (SK33) unit 1.0000 Rp 6,717,600.00 Rp 6,717,600.00
Tenaga Kerja :
1 Pekerja oh 0.0300 Rp 136,000.00 Rp 4,080.00
2 Tukang oh 0.3000 Rp 145,000.00 Rp 43,500.00
3 Kepala tukang oh 0.0300 Rp 155,000.00 Rp 4,650.00
4 Mandor oh 0.0150 Rp 155,000.00 Rp 2,325.00
Jumlah harga persatuan pekerjaan Rp 6,772,155.00
Biaya umum dan Keuntungan 10% Rp 677,215.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 7,449,370.50
15 1 bh Pasangan Service zink + kran lengkap dengan aksesoris A.5.1.1.33. Rp 10,672,810.50
Bahan :
1 Service zink + kran lengkap dengan aksesoris (SK322E) unit 1.0000 Rp 9,648,000.00 Rp 9,648,000.00
Tenaga Kerja :
1 Pekerja oh 0.0300 Rp 136,000.00 Rp 4,080.00
2 Tukang oh 0.3000 Rp 145,000.00 Rp 43,500.00
3 Kepala tukang oh 0.0300 Rp 155,000.00 Rp 4,650.00
4 Mandor oh 0.0150 Rp 155,000.00 Rp 2,325.00
Jumlah harga persatuan pekerjaan Rp 9,702,555.00
Biaya umum dan Keuntungan 10% Rp 970,255.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 10,672,810.50
16 1 bh Pemasangan hand dryer lengkap dengan aksesoris Analisa lapangan Rp 1,413,417.50
Bahan :
1 Hand Dryer bh 1.0000 Rp 1,132,800.00 Rp 1,132,800.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.5000 Rp 136,000.00 Rp 68,000.00
2 Tukang batu L.02 oh 0.5000 Rp 145,000.00 Rp 72,500.00
3 Kepala tukang L.03 oh 0.0500 Rp 155,000.00 Rp 7,750.00
4 Mandor L.04 oh 0.0250 Rp 155,000.00 Rp 3,875.00
Jumlah harga persatuan pekerjaan Rp 1,284,925.00
Biaya umum dan Keuntungan 10% Rp 128,492.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,413,417.50
17 1 bh Pemasangan Kitchen Zink Stainless Steel satu lubang + kran A.5.1.1.33. Rp 918,010.50
Bahan :
1 Kitchen Zink Stainless Steel satu lubang dengan water drain + kran lengkap dengan aksesoris
bh 1.0000 Rp 780,000.00 Rp 780,000.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.0300 Rp 136,000.00 Rp 4,080.00
2 Tukang batu L.02 oh 0.3000 Rp 145,000.00 Rp 43,500.00
3 Kepala tukang L.03 oh 0.0300 Rp 155,000.00 Rp 4,650.00
4 Mandor L.04 oh 0.0150 Rp 155,000.00 Rp 2,325.00
Jumlah harga persatuan pekerjaan Rp 834,555.00
Biaya umum dan Keuntungan 10% Rp 83,455.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 918,010.50
18 1 unit Pemasangan Tempat duduk kamar mandi Analisa lapangan Rp 3,448,709.55
Bahan :
1 Tempat duduk kamar mandi bh 1.0000 Rp 3,076,128.00 Rp 3,076,128.00
Tenaga Kerja :

Analisa Harga Satuan Arsitektur - page 80 of 212


No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan
1 Pekerja oh 0.1250 Rp 136,000.00 Rp 17,000.00
2 Tukang oh 0.2500 Rp 145,000.00 Rp 36,250.00
3 Kepala tukang oh 0.0250 Rp 155,000.00 Rp 3,875.00
4 Mandor oh 0.0125 Rp 155,000.00 Rp 1,937.50
Jumlah harga persatuan pekerjaan Rp 3,135,190.50
Biaya umum dan Keuntungan 10% Rp 313,519.05
Harga Satuan Pekerjaan Rp 3,448,709.55
19 1 m² Pemasangan Cubical toilet clear tempered glass 12mm Analisa lapangan Rp 2,692,800.00
Bahan :
1 Cubical toilet clear tempered glass laminbated tebal 2x6mm m² 1.0000 Rp 2,448,000.00 Rp 2,448,000.00
- w/. Patterned laminated finished lengkap support, hardware & accesories
- Cubicle fitting : Door hinge, door handle, door lock, coat hook.
- Pedestal : Stainless steel head bar, alumunium stopper, U chanel alumunium profile anodize colour
Termasuk Upah Pasang dan Material Bantu
Jumlah harga persatuan pekerjaan Rp 2,448,000.00
Biaya umum dan Keuntungan 10% Rp 244,800.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 2,692,800.00
20 1 m² Pasangan Cubical toilet phenolic system tebal 12 mm Analisa lapangan Rp 2,145,000.00
Bahan :
1 Phenolic cubicle toilet system tebal 12 mm m² 1.0000 Rp 1,950,000.00 Rp 1,950,000.00
- Cubicle fitting : Door hinge, door handle, door lock, coat hook.
- Pedestal : Stainless steel head bar, alumunium stopper, U chanel alumunium profile anodize colour
Termasuk Upah Pasang dan Material Bantu
Jumlah harga persatuan pekerjaan Rp 1,950,000.00
Biaya umum dan Keuntungan 10% Rp 195,000.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 2,145,000.00
21 1 m² Pemasangan Grill Besi Stainless Steel Lebar 30 cm Analisa lapangan Rp 407,962.50
Bahan :
1 Grill Besi Stainless Steel Lebar 30 cm m' 1.0000 Rp 350,000.00 Rp 350,000.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.1250 Rp 136,000.00 Rp 17,000.00
2 Mandor L.04 oh 0.0250 Rp 155,000.00 Rp 3,875.00
Jumlah harga persatuan pekerjaan Rp 370,875.00
Biaya umum dan Keuntungan 10% Rp 37,087.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 407,962.50
22 1 m² Pemasangan Grill Besi Stainless Steel Lebar 40 cm Analisa lapangan Rp 473,962.50
Bahan :
1 Grill Besi Stainless Steel Lebar 40 cm m' 1.0000 Rp 410,000.00 Rp 410,000.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.1250 Rp 136,000.00 Rp 17,000.00
2 Mandor L.04 oh 0.0250 Rp 155,000.00 Rp 3,875.00
Jumlah harga persatuan pekerjaan Rp 430,875.00
Biaya umum dan Keuntungan 10% Rp 43,087.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 473,962.50
PEKERJAAN PENGECATAN
1 1 m² Pengecatan dinding emultion paint A.4.7.1.10. Rp 33,260.15
Bahan :
1 Plamir (1 x Lapis) kg - Rp 23,000.00 Rp -
2 Cat dasar (1 x Lapis) kg 0.1000 Rp 27,700.00 Rp 2,770.00
3 Cat penutup (2 x lapis) kg 0.2600 Rp 54,500.00 Rp 14,170.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.0200 Rp 136,000.00 Rp 2,720.00
2 Tukang cat L.02 oh 0.0630 Rp 145,000.00 Rp 9,135.00
3 Kepala tukang L.03 oh 0.0063 Rp 155,000.00 Rp 976.50
4 Mandor L.04 oh 0.0030 Rp 155,000.00 Rp 465.00
Jumlah harga persatuan pekerjaan Rp 30,236.50
Biaya umum dan Keuntungan 10% Rp 3,023.65
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 33,260.15
2 1 m² Pengecatan dinding weathershield A.4.7.1.10. Rp 41,983.15
Bahan :
1 Plamir (1 x Lapis) kg - Rp 23,000.00 Rp -
2 Cat dasar (1 x Lapis) kg 0.1000 Rp 27,700.00 Rp 2,770.00
3 Cat penutup (2 x lapis) kg 0.2600 Rp 85,000.00 Rp 22,100.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.0200 Rp 136,000.00 Rp 2,720.00
2 Tukang cat L.02 oh 0.0630 Rp 145,000.00 Rp 9,135.00
3 Kepala tukang L.03 oh 0.0063 Rp 155,000.00 Rp 976.50
4 Mandor L.04 oh 0.0030 Rp 155,000.00 Rp 465.00
Jumlah harga persatuan pekerjaan Rp 38,166.50
Biaya umum dan Keuntungan 10% Rp 3,816.65
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 41,983.15
3 1 m² Pengecatan dinding dustproof paint A.4.7.1.10. Rp 38,435.65
Bahan :
1 Plamir (1 x Lapis) kg 0.1000 Rp 23,000.00 Rp 2,300.00
2 Cat dasar (1 x Lapis) kg 0.1000 Rp 27,700.00 Rp 2,770.00
3 Cat penutup (2 x lapis) kg 0.2600 Rp 63,750.00 Rp 16,575.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.0200 Rp 136,000.00 Rp 2,720.00
2 Tukang cat L.02 oh 0.0630 Rp 145,000.00 Rp 9,135.00
3 Kepala tukang L.03 oh 0.0063 Rp 155,000.00 Rp 976.50
4 Mandor L.04 oh 0.0030 Rp 155,000.00 Rp 465.00

Analisa Harga Satuan Arsitektur - page 81 of 212


No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan
Jumlah harga persatuan pekerjaan Rp 34,941.50
Biaya umum dan Keuntungan 10% Rp 3,494.15
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 38,435.65
4 1 m² Pengecatan dinding enamel paint (Epoxy) A.4.7.1.10. Rp 41,109.75
Bahan :
1 Plamir (1 x Lapis) kg 0.1000 Rp 23,000.00 Rp 2,300.00
2 Cat dasar (1 x Lapis) kg 0.1000 Rp 27,700.00 Rp 2,770.00
3 Cat penutup (2 x lapis) kg 0.2600 Rp 73,100.00 Rp 19,006.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.0200 Rp 136,000.00 Rp 2,720.00
2 Tukang cat L.02 oh 0.0630 Rp 145,000.00 Rp 9,135.00
3 Kepala tukang L.03 oh 0.0063 Rp 155,000.00 Rp 976.50
4 Mandor L.04 oh 0.0030 Rp 155,000.00 Rp 465.00
Jumlah harga persatuan pekerjaan Rp 37,372.50
Biaya umum dan Keuntungan 10% Rp 3,737.25
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 41,109.75
5 1 m² Pengecatan plafond emultion paint A.4.7.1.10. Rp 40,498.15
Bahan :
1 Plamir (1 x Lapis) kg 0.1000 Rp 23,000.00 Rp 2,300.00
2 Cat penutup (2 x lapis) kg 0.2600 Rp 54,500.00 Rp 14,170.00
3 Tape Rolll 0.1800 Rp 35,000.00 Rp 6,300.00
4 Amplas Rolll 0.1000 Rp 7,500.00 Rp 750.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.0200 Rp 136,000.00 Rp 2,720.00
2 Tukang cat L.02 oh 0.0630 Rp 145,000.00 Rp 9,135.00
3 Kepala tukang L.03 oh 0.0063 Rp 155,000.00 Rp 976.50
4 Mandor L.04 oh 0.0030 Rp 155,000.00 Rp 465.00
Jumlah harga persatuan pekerjaan Rp 36,816.50
Biaya umum dan Keuntungan 10% Rp 3,681.65
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 40,498.15
6 1 m' Pengecatan list plafond emultion paint A.4.7.1.10. Modifikasi Rp 3,620.82
Bahan :
1 Cat dasar (1 x Lapis) kg 0.0100 Rp 54,500.00 Rp 545.00
2 Cat penutup (2 x lapis) kg 0.0260 Rp 54,500.00 Rp 1,417.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.0020 Rp 136,000.00 Rp 272.00
2 Tukang cat L.02 oh 0.0063 Rp 145,000.00 Rp 913.50
3 Kepala tukang L.03 oh 0.0006 Rp 155,000.00 Rp 97.65
4 Mandor L.04 oh 0.0003 Rp 155,000.00 Rp 46.50
Jumlah harga persatuan pekerjaan Rp 3,291.65
Biaya umum dan Keuntungan 10% Rp 329.17
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 3,620.82
7 1 m' Pengecatan list plafond weathershield A.4.7.1.10. Modifikasi Rp 4,493.12
Bahan :
1 Cat dasar (1 x Lapis) kg 0.0100 Rp 54,500.00 Rp 545.00
2 Cat penutup (2 x lapis) kg 0.0260 Rp 85,000.00 Rp 2,210.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.0020 Rp 136,000.00 Rp 272.00
2 Tukang cat L.02 oh 0.0063 Rp 145,000.00 Rp 913.50
3 Kepala tukang L.03 oh 0.0006 Rp 155,000.00 Rp 97.65
4 Mandor L.04 oh 0.0003 Rp 155,000.00 Rp 46.50
Jumlah harga persatuan pekerjaan Rp 4,084.65
Biaya umum dan Keuntungan 10% Rp 408.47
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 4,493.12
8 1 m' Pengecatan list plafond enamel paint (epoxy) A.4.7.1.10. Modifikasi Rp 3,620.82
Bahan :
1 Cat dasar (1 x Lapis) kg 0.0100 Rp 54,500.00 Rp 545.00
2 Cat penutup (2 x lapis) kg 0.0260 Rp 54,500.00 Rp 1,417.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.0020 Rp 136,000.00 Rp 272.00
2 Tukang cat L.02 oh 0.0063 Rp 145,000.00 Rp 913.50
3 Kepala tukang L.03 oh 0.0006 Rp 155,000.00 Rp 97.65
4 Mandor L.04 oh 0.0003 Rp 155,000.00 Rp 46.50
Jumlah harga persatuan pekerjaan Rp 3,291.65
Biaya umum dan Keuntungan 10% Rp 329.17
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 3,620.82
9 1 m' Pengecatan list plafond dustproof paint A.4.7.1.10. Modifikasi Rp 3,885.37
Bahan :
1 Cat dasar (1 x Lapis) kg 0.0100 Rp 54,500.00 Rp 545.00
2 Cat penutup (2 x lapis) kg 0.0260 Rp 63,750.00 Rp 1,657.50
Tenaga Kerja :
1 Pekerja L.01 oh 0.0020 Rp 136,000.00 Rp 272.00
2 Tukang cat L.02 oh 0.0063 Rp 145,000.00 Rp 913.50
3 Kepala tukang L.03 oh 0.0006 Rp 155,000.00 Rp 97.65
4 Mandor L.04 oh 0.0003 Rp 155,000.00 Rp 46.50
Jumlah harga persatuan pekerjaan Rp 3,532.15
Biaya umum dan Keuntungan 10% Rp 353.22
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 3,885.37
10 1 m² Pengecatan plafond weathershield A.4.7.1.10. Rp 49,221.15
Bahan :
1 Plamir (1 x Lapis) kg 0.1000 Rp 23,000.00 Rp 2,300.00

Analisa Harga Satuan Arsitektur - page 82 of 212


No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan
2 Cat penutup (2 x lapis) kg 0.2600 Rp 85,000.00 Rp 22,100.00
3 Tape Rolll 0.1800 Rp 35,000.00 Rp 6,300.00
4 Amplas Rolll 0.1000 Rp 7,500.00 Rp 750.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.0200 Rp 136,000.00 Rp 2,720.00
2 Tukang cat L.02 oh 0.0630 Rp 145,000.00 Rp 9,135.00
3 Kepala tukang L.03 oh 0.0063 Rp 155,000.00 Rp 976.50
4 Mandor L.04 oh 0.0030 Rp 155,000.00 Rp 465.00
Jumlah harga persatuan pekerjaan Rp 44,746.50
Biaya umum dan Keuntungan 10% Rp 4,474.65
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 49,221.15
11 1 m² Pengecatan plafond enamel paint (Epoxy) A.4.7.1.10. Rp 41,109.75
Bahan :
1 Plamir (1 x Lapis) kg 0.1000 Rp 23,000.00 Rp 2,300.00
2 Cat dasar (1 x Lapis) kg 0.1000 Rp 27,700.00 Rp 2,770.00
3 Cat penutup (2 x lapis) kg 0.2600 Rp 73,100.00 Rp 19,006.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.0200 Rp 136,000.00 Rp 2,720.00
2 Tukang cat L.02 oh 0.0630 Rp 145,000.00 Rp 9,135.00
3 Kepala tukang L.03 oh 0.0063 Rp 155,000.00 Rp 976.50
4 Mandor L.04 oh 0.0030 Rp 155,000.00 Rp 465.00
Jumlah harga persatuan pekerjaan Rp 37,372.50
Biaya umum dan Keuntungan 10% Rp 3,737.25
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 41,109.75
12 1 m² Pengecatan plafond dustrproof A.4.7.1.10. Rp 38,435.65
Bahan :
1 Plamir (1 x Lapis) kg 0.1000 Rp 23,000.00 Rp 2,300.00
2 Cat dasar (1 x Lapis) kg 0.1000 Rp 27,700.00 Rp 2,770.00
3 Cat penutup (2 x lapis) kg 0.2600 Rp 63,750.00 Rp 16,575.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.0200 Rp 136,000.00 Rp 2,720.00
2 Tukang cat L.02 oh 0.0630 Rp 145,000.00 Rp 9,135.00
3 Kepala tukang L.03 oh 0.0063 Rp 155,000.00 Rp 976.50
4 Mandor L.04 oh 0.0030 Rp 155,000.00 Rp 465.00
Jumlah harga persatuan pekerjaan Rp 34,941.50
Biaya umum dan Keuntungan 10% Rp 3,494.15
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 38,435.65
13 1 m' Pengecatan plint Int Semi Gloss A.4.7.1.10. Modifikasi Rp 3,879.32
Bahan :
1 Plamir (1 x Lapis) kg 0.0100 Rp 23,000.00 Rp 230.00
2 Cat dasar (1 x Lapis) kg 0.0100 Rp 27,700.00 Rp 277.00
3 Cat penutup (2 x lapis) kg 0.0260 Rp 65,000.00 Rp 1,690.00
Tenaga Kerja :
1 Pekerja L.01 oh 0.0020 Rp 136,000.00 Rp 272.00
2 Tukang cat L.02 oh 0.0063 Rp 145,000.00 Rp 913.50
3 Kepala tukang L.03 oh 0.0006 Rp 155,000.00 Rp 97.65
4 Mandor L.04 oh 0.0003 Rp 155,000.00 Rp 46.50
Jumlah harga persatuan pekerjaan Rp 3,526.65
Biaya umum dan Keuntungan 10% Rp 352.67
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 3,879.32
14 1 m' Pengecatan Bidang Besi Baru, 3X Lapis Penutup A.4.7.1.10. Modifikasi #REF!
Bahan :
1 Menie besi kg 0.1670 #REF! #REF!
2 Ampelas lbr 0.4000 #REF! #REF!
3 Cat dasar besi kg 0.4000 #REF! #REF!
4 Cat besi kg 0.2000
5 Minyak cat thinner A ltr 0.1500
6 Kuas bh 0.1000
Tenaga Kerja :
1 Tukang cat L.02 oh 0.0833 #REF! #REF!
2 Kepala tukang L.03 oh 0.0023 #REF! #REF!
3 Mandor L.04 oh 0.0002 #REF! #REF!
Jumlah harga persatuan pekerjaan #REF!
Biaya umum dan Keuntungan 10% #REF!
Total = Jumlah+(Biaya umum dan Keuntungan 10%) #REF!
PEKERJAAN KUSEN PINTU DAN JENDELA ALLUMUNIUM
1 1 m' Pemasangan alumunium kusen pintu A.4.2.1.24. Rp 170,501.00
Bahan :
1 Alumunium Kusen Pintu m' 1.1000 Rp 140,000.00 Rp 154,000.00
2 Skrup fixer bh 2.0000 Rp 336.00 Rp 672.00
3 Sealent dengan lakban ex. GE/ Wacker non stain atau setara tube 0.0600 Rp 45,900.00 Rp 2,754.00
Tenaga Kerja :
1 Pekerja oh 0.0430 Rp 136,000.00 Rp 5,848.00
2 Tukang oh 0.0430 Rp 145,000.00 Rp 6,235.00
3 Kepala tukang oh 0.0043 Rp 155,000.00 Rp 666.50
4 Mandor oh 0.0021 Rp 155,000.00 Rp 325.50
Jumlah harga persatuan pekerjaan Rp 170,501.00
2 1 m' Pemasangan alumunium kusen jendela A.4.2.1.24. Rp 170,501.00
Bahan :
1 Alumunium Kusen Jendela m' 1.1000 Rp 140,000.00 Rp 154,000.00
2 Skrup fixer bh 2.0000 Rp 336.00 Rp 672.00

Analisa Harga Satuan Arsitektur - page 83 of 212


No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan
3 Sealent tube 0.0600 Rp 45,900.00 Rp 2,754.00
Tenaga Kerja :
1 Pekerja oh 0.0430 Rp 136,000.00 Rp 5,848.00
2 Tukang oh 0.0430 Rp 145,000.00 Rp 6,235.00
3 Kepala tukang oh 0.0043 Rp 155,000.00 Rp 666.50
4 Mandor oh 0.0021 Rp 155,000.00 Rp 325.50
Jumlah harga persatuan pekerjaan Rp 170,501.00
3 1 m² Pemasangan alumunium Frame Daun Pintu Kaca A.4.2.1.26. Rp 566,080.00
Bahan :
1 Alumunium Frame Daun Pintu m' 4.4000 Rp 110,000.00 Rp 484,000.00
2 Profil Kaca m' 4.5000 Rp 9,696.00 Rp 43,632.00
3 Sealent tube 0.2700 Rp 45,900.00 Rp 12,393.00
Tenaga Kerja :
1 Pekerja oh 0.0850 Rp 136,000.00 Rp 11,560.00
2 Tukang oh 0.0850 Rp 145,000.00 Rp 12,325.00
3 Kepala tukang oh 0.0090 Rp 155,000.00 Rp 1,395.00
4 Mandor oh 0.0050 Rp 155,000.00 Rp 775.00
Jumlah harga persatuan pekerjaan Rp 566,080.00
4 1 m² Pemasangan alumunium Frame Daun Jendela Kaca A.4.2.1.26. Rp 544,080.00
Bahan :
1 Alumunium Frame Daun Jendela m' 4.4000 Rp 105,000.00 Rp 462,000.00
2 Profil Kaca m' 4.5000 Rp 9,696.00 Rp 43,632.00
3 Sealent tube 0.2700 Rp 45,900.00 Rp 12,393.00
Tenaga Kerja :
1 Pekerja oh 0.0850 Rp 136,000.00 Rp 11,560.00
2 Tukang oh 0.0850 Rp 145,000.00 Rp 12,325.00
3 Kepala tukang oh 0.0090 Rp 155,000.00 Rp 1,395.00
4 Mandor oh 0.0050 Rp 155,000.00 Rp 775.00
Jumlah harga persatuan pekerjaan Rp 544,080.00
5 1 m² Pemasangan Kaca tinted 6 mm A.4.6.2.17. Rp 559,174.00
Bahan :
1 Kaca tinted 6 mm m² 1.1000 Rp 482,400.00 Rp 530,640.00
2 Sealent tube 0.0500 Rp 45,900.00 Rp 2,295.00
Tenaga Kerja :
1 Pekerja oh 0.0150 Rp 136,000.00 Rp 2,040.00
2 Tukang oh 0.1500 Rp 145,000.00 Rp 21,750.00
3 Kepala tukang oh 0.0150 Rp 155,000.00 Rp 2,325.00
4 Mandor oh 0.0008 Rp 155,000.00 Rp 124.00
Jumlah harga persatuan pekerjaan Rp 559,174.00
6 1 m² Pemasangan Kaca tinted 8 mm A.4.6.2.18. Rp 740,469.50
Bahan :
1 Kaca tinted 8 mm m² 1.1000 Rp 643,200.00 Rp 707,520.00
2 Sealent tube 0.0700 Rp 45,900.00 Rp 3,213.00
Tenaga Kerja :
1 Pekerja oh 0.0170 Rp 136,000.00 Rp 2,312.00
2 Tukang oh 0.1700 Rp 145,000.00 Rp 24,650.00
3 Kepala tukang oh 0.0170 Rp 155,000.00 Rp 2,635.00
4 Mandor oh 0.0009 Rp 155,000.00 Rp 139.50
Jumlah harga persatuan pekerjaan Rp 740,469.50
7 1 m² Pemasangan Kaca clear 6 mm A.4.6.2.17. Rp 345,334.00
Bahan :
1 Kaca Clear 6 mm ex. Asaimas atau setara m² 1.1000 Rp 288,000.00 Rp 316,800.00
2 Sealent tube 0.0500 Rp 45,900.00 Rp 2,295.00
Tenaga Kerja :
1 Pekerja oh 0.0150 Rp 136,000.00 Rp 2,040.00
2 Tukang oh 0.1500 Rp 145,000.00 Rp 21,750.00
3 Kepala tukang oh 0.0150 Rp 155,000.00 Rp 2,325.00
4 Mandor oh 0.0008 Rp 155,000.00 Rp 124.00
Jumlah harga persatuan pekerjaan Rp 345,334.00
8 1 m² Pemasangan Kaca tempered 8 mm A.4.6.2.18. Rp 690,309.50
Bahan :
1 Kaca tempered 8 mm m² 1.1000 Rp 597,600.00 Rp 657,360.00
2 Sealent tube 0.0700 Rp 45,900.00 Rp 3,213.00
Tenaga Kerja :
1 Pekerja oh 0.0170 Rp 136,000.00 Rp 2,312.00
2 Tukang oh 0.1700 Rp 145,000.00 Rp 24,650.00
3 Kepala tukang oh 0.0170 Rp 155,000.00 Rp 2,635.00
4 Mandor oh 0.0009 Rp 155,000.00 Rp 139.50
Jumlah harga persatuan pekerjaan Rp 690,309.50
9 1 m² Pemasangan Kaca tempered 12 mm A.4.6.2.19. Rp 933,979.50
Bahan :
1 Kaca tempered 12 mm m² 1.1000 Rp 806,400.00 Rp 887,040.00
2 Sealent tube 0.0700 Rp 45,900.00 Rp 3,213.00
Tenaga Kerja :
1 Pekerja oh 0.0250 Rp 136,000.00 Rp 3,400.00
2 Tukang oh 0.2500 Rp 145,000.00 Rp 36,250.00
3 Kepala tukang oh 0.0250 Rp 155,000.00 Rp 3,875.00
4 Mandor oh 0.0013 Rp 155,000.00 Rp 201.50
Jumlah harga persatuan pekerjaan Rp 933,979.50
10 1 m² Pemasangan Ram Harmonika Rp 387,946.50
Bahan :

Analisa Harga Satuan Arsitektur - page 84 of 212


No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan
1 Kawat Harmonika m² 1.0000 Rp 78,000.00 Rp 78,000.00
2 Sealent tube 5.8000 Rp 45,900.00 Rp 266,220.00
Tenaga Kerja :
1 Pekerja oh 0.0250 Rp 136,000.00 Rp 3,400.00
2 Tukang oh 0.2500 Rp 145,000.00 Rp 36,250.00
3 Kepala tukang oh 0.0250 Rp 155,000.00 Rp 3,875.00
4 Mandor oh 0.0013 Rp 155,000.00 Rp 201.50
Jumlah harga persatuan pekerjaan Rp 387,946.50
PEKERJAAN KUSEN PINTU
1 1 unit Pemasangan Pintu type D 1A (Gedung A) Rp 20,720,843.53
'-Daun Pintu
1 Pemasangan Kaca tempered 12 mm m² 13.6350 Rp 933,979.50 Rp 12,734,810.48
-Aksesories & Hardware
1 Pull Handle set 2.0000 Rp 593,600.00 Rp 1,187,200.00
2 Floor Hinge set 2.0000 Rp 1,134,560.00 Rp 2,269,120.00
3 Top patch set 2.0000 Rp 204,680.00 Rp 409,360.00
4 Bottom Patch fitting kaca (ex. PT 10) set 2.0000 Rp 1,069,600.00 Rp 2,139,200.00
5 Kunci pintu kaca US 10 set 1.0000 Rp 97,440.00 Rp 97,440.00

Jumlah harga persatuan pekerjaan Rp 18,837,130.48


Biaya umum dan Keuntungan 10% Rp 1,883,713.05
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 20,720,843.53
2 1 unit Pemasangan Pintu type D 2A (Gedung A) Rp 20,720,843.53
'-Daun Pintu
1 Pemasangan Kaca tempered 12 mm m² 13.6350 Rp 933,979.50 Rp 12,734,810.48
-Aksesories & Hardware
1 Pull Handle set 2.0000 Rp 593,600.00 Rp 1,187,200.00
2 Floor Hinge set 2.0000 Rp 1,134,560.00 Rp 2,269,120.00
3 Top patch set 2.0000 Rp 204,680.00 Rp 409,360.00
4 Bottom Patch fitting kaca (ex. PT 10) set 2.0000 Rp 1,069,600.00 Rp 2,139,200.00
5 Kunci pintu kaca US 10 set 1.0000 Rp 97,440.00 Rp 97,440.00

Jumlah harga persatuan pekerjaan Rp 18,837,130.48


Biaya umum dan Keuntungan 10% Rp 1,883,713.05
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 20,720,843.53
3 1 unit Pemasangan Pintu type D uk. 900 x 2200 mm Frameless (Gedung A) Rp 7,007,727.99
-Frame Allumunium
1 Pemasangan alumunium Frame Daun Pintu Kaca m² 1.9800 Rp 566,080.00 Rp 1,120,838.40
'-Daun Pintu
1 Kaca tempered 12 mm Clear/ Polos m² 1.9800 Rp 933,979.50 Rp 1,849,279.41
-Aksesories & Hardware
1 Pull Handle set 1.0000 Rp 593,600.00 Rp 593,600.00
2 Floor Hinge set 1.0000 Rp 1,134,560.00 Rp 1,134,560.00
3 Cylinder set 1.0000 Rp 107,520.00 Rp 107,520.00
4 Mortise Lock set 1.0000 Rp 240,128.00 Rp 240,128.00
5 FH Top Pivot pintu alumunium/ kayu set 1.0000 Rp 255,136.00 Rp 255,136.00
6 Bottom Patch fitting kaca (ex. PT 10) set 1.0000 Rp 1,069,600.00 Rp 1,069,600.00

Jumlah harga persatuan pekerjaan Rp 6,370,661.81


Biaya umum dan Keuntungan 10% Rp 637,066.18
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 7,007,727.99
4 1 unit Pemasangan Pintu type D 1B (Gedung B) Rp 86,495,017.84
-Frame Allumunium
1 Alumunium profil U penjepit kaca m² 44.2200 Rp 35,000.00 Rp 1,547,700.00
'-Daun Pintu
1 Kaca tempered 12 mm Clear/ Polos m² 38.6460 Rp 806,400.00 Rp 31,164,134.40
-Aksesories & Hardware
1 Operator Mesin Aoutomatic + Radar (DORMA ES 200) set 1.0000 Rp 45,920,000.00 Rp 45,920,000.00
- Dilengkapi dengan : Mechanic Door Carrier, Alumunium profil, Electronic
board, Motor, sensor radar, optima selector, electrical lock, manual
release, Emergency Battery

Jumlah harga persatuan pekerjaan Rp 78,631,834.40


Biaya umum dan Keuntungan 10% Rp 7,863,183.44
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 86,495,017.84
5 1 unit Pemasangan Partisi kaca dan Pintu Uk. 1200x2150 mm (sliding) tipe FR Rp 24,347,175.55
-Frame Allumunium
1 Pemasangan alumunium kusen pintu m' 46.1332 Rp 170,501.00 Rp 7,865,756.73
2 Pemasangan alumunium Frame Daun Pintu Kaca m² 2.6400 Rp 566,080.00 Rp 1,494,451.20
'-Daun Pintu
1 Pemasangan Kaca tempered 8 mm m² 16.6266 Rp 690,309.50 Rp 11,477,479.22
-Aksesories & Hardware
1 Lever Handle LHTR 0017 SSS set 1.0000 Rp 198,755.20 Rp 198,755.20
2 Cylinder set 1.0000 Rp 107,520.00 Rp 107,520.00
3 Mortise Lock set 1.0000 Rp 240,128.00 Rp 240,128.00
4 Rel pintu slidding door set 1.0000 Rp 749,705.60 Rp 749,705.60

Jumlah harga persatuan pekerjaan Rp 22,133,795.96


Biaya umum dan Keuntungan 10% Rp 2,213,379.60
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 24,347,175.55
6 1 unit Pemasangan Pintu type A Uk. 900x2150 mm Rp 3,918,272.60

Analisa Harga Satuan Arsitektur - page 85 of 212


No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan
-Frame Allumunium
1 Pemasangan alumunium kusen pintu m' 5.2000 Rp 170,501.00 Rp 886,605.20
'-Daun Pintu
1 Daun Pintu Frame kayu meranti, core solid balsa PVC laminated Sheet uk. 900 x 2100 bh 1.0000 Rp 1,358,500.00 Rp 1,358,500.00
-Aksesories & Hardware
1 Lever Handle LHTR 0017 SSS set 1.0000 Rp 198,755.20 Rp 198,755.20
2 Cylinder set 1.0000 Rp 107,520.00 Rp 107,520.00
3 Mortise Lock set 1.0000 Rp 240,128.00 Rp 240,128.00
4 Engsel pintu bh 3.0000 Rp 83,563.20 Rp 250,689.60
5 Door closer set 1.0000 Rp 477,568.00 Rp 477,568.00
6 Kick plat T=2 mm lebar 20cm m² 0.1800 Rp 235,000.00 Rp 42,300.00

Jumlah harga persatuan pekerjaan Rp 3,562,066.00


Biaya umum dan Keuntungan 10% Rp 356,206.60
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 3,918,272.60
7 1 unit Pemasangan Pintu type A Uk. 900x2150 mm + Bouvenlight +2850 AFFL Rp 4,554,768.53
-Frame Allumunium
1 Pemasangan alumunium kusen pintu m' 7.5000 Rp 170,501.00 Rp 1,278,757.50
'-Daun Pintu
1 Daun Pintu Frame kayu meranti, core solid balsa PVC laminated Sheet uk. 900 x 2100 bh 1.0000 Rp 1,358,500.00 Rp 1,358,500.00
2 Pemasangan Kaca clear 6 mm m² 0.5400 Rp 345,334.00 Rp 186,480.36
-Aksesories & Hardware
1 Lever Handle LHTR 0017 SSS set 1.0000 Rp 198,755.20 Rp 198,755.20
2 Cylinder set 1.0000 Rp 107,520.00 Rp 107,520.00
3 Mortise Lock set 1.0000 Rp 240,128.00 Rp 240,128.00
4 Engsel pintu bh 3.0000 Rp 83,563.20 Rp 250,689.60
5 Door closer set 1.0000 Rp 477,568.00 Rp 477,568.00
6 Kick plat T=2 mm lebar 20cm m² 0.1800 Rp 235,000.00 Rp 42,300.00

Jumlah harga persatuan pekerjaan Rp 4,140,698.66


Biaya umum dan Keuntungan 10% Rp 414,069.87
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 4,554,768.53
8 1 unit Pemasangan Pintu type A Uk. 1200x2150 mm Rp 4,880,003.04
-Frame Allumunium
1 Pemasangan alumunium kusen pintu m' 5.6000 Rp 170,501.00 Rp 954,805.60
'-Daun Pintu
1 Daun Pintu Frame kayu meranti, core solid balsa PVC laminated Sheet uk. 1200 x 2100 bh 1.0000 Rp 2,150,500.00 Rp 2,150,500.00
-Aksesories & Hardware
1 Lever Handle LHTR 0017 SSS set 1.0000 Rp 198,755.20 Rp 198,755.20
2 Cylinder set 1.0000 Rp 107,520.00 Rp 107,520.00
3 Mortise Lock set 1.0000 Rp 240,128.00 Rp 240,128.00
4 Engsel pintu bh 3.0000 Rp 83,563.20 Rp 250,689.60
5 Door closer set 1.0000 Rp 477,568.00 Rp 477,568.00
6 Kick plat T=2 mm lebar 20cm m² 0.2400 Rp 235,000.00 Rp 56,400.00

Jumlah harga persatuan pekerjaan Rp 4,436,366.40


Biaya umum dan Keuntungan 10% Rp 443,636.64
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 4,880,003.04
9 1 unit Pemasangan Pintu type A Uk. 2x900x2150 mm Rp 6,910,189.55
-Frame Allumunium
1 Pemasangan alumunium kusen pintu m' 6.1000 Rp 170,501.00 Rp 1,040,056.10
'-Daun Pintu
1 Daun Pintu Frame kayu meranti, core solid balsa PVC laminated Sheet uk. 900 x 2100 bh 2.0000 Rp 1,358,500.00 Rp 2,717,000.00
-Aksesories & Hardware
1 Lever Handle LHTR 0017 SSS set 2.0000 Rp 198,755.20 Rp 397,510.40
2 Cylinder set 1.0000 Rp 107,520.00 Rp 107,520.00
3 Mortise Lock set 1.0000 Rp 240,128.00 Rp 240,128.00
4 Engsel pintu bh 6.0000 Rp 83,563.20 Rp 501,379.20
5 Door closer set 2.0000 Rp 477,568.00 Rp 955,136.00
6 Kunci tanam Flush Bolt FB 040 S/S 8 + 18 SSS set 1.0000 Rp 238,660.80 Rp 238,660.80
7 Kick plat T=2 mm lebar 20cm m² 0.3600 Rp 235,000.00 Rp 84,600.00

Jumlah harga persatuan pekerjaan Rp 6,281,990.50


Biaya umum dan Keuntungan 10% Rp 628,199.05
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 6,910,189.55
10 1 unit Pemasangan Pintu type A Uk. 2x900x2150 mm + Bouvenlight +2850 AFFL Rp 8,051,895.63
-Frame Allumunium
1 Pemasangan alumunium kusen pintu m' 10.0000 Rp 170,501.00 Rp 1,705,010.00
'-Daun Pintu
1 Daun Pintu Frame kayu meranti, core solid balsa PVC laminated Sheet uk. 900 x 2100 bh 2.0000 Rp 1,358,500.00 Rp 2,717,000.00
2 Pemasangan Kaca clear 6 mm m² 1.0800 Rp 345,334.00 Rp 372,960.72
-Aksesories & Hardware
1 Lever Handle LHTR 0017 SSS set 2.0000 Rp 198,755.20 Rp 397,510.40
2 Cylinder set 1.0000 Rp 107,520.00 Rp 107,520.00
3 Mortise Lock set 1.0000 Rp 240,128.00 Rp 240,128.00
4 Engsel pintu bh 6.0000 Rp 83,563.20 Rp 501,379.20
5 Door closer set 2.0000 Rp 477,568.00 Rp 955,136.00
6 Kunci tanam Flush Bolt FB 040 S/S 8 + 18 SSS set 1.0000 Rp 238,660.80 Rp 238,660.80
7 Kick plat T=2 mm lebar 20cm m² 0.3600 Rp 235,000.00 Rp 84,600.00

Jumlah harga persatuan pekerjaan Rp 7,319,905.12

Analisa Harga Satuan Arsitektur - page 86 of 212


No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan
Biaya umum dan Keuntungan 10% Rp 731,990.51
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 8,051,895.63
11 1 unit Pemasangan Pintu type B Uk. 900 x 2150 mm Rp 4,917,768.53
-Frame Allumunium
1 Pemasangan alumunium kusen pintu m' 7.5000 Rp 170,501.00 Rp 1,278,757.50
'-Daun Pintu
1 Daun Pintu Frame kayu meranti, PVC laminated Sheet uk. 900 x 2100. bh 1.0000 Rp 1,688,500.00 Rp 1,688,500.00
+ kaca 8 mm (200 x 700 mm)
2 Pemasangan Kaca clear 6 mm m² 0.5400 Rp 345,334.00 Rp 186,480.36
-Aksesories & Hardware
1 Lever Handle LHTR 0017 SSS set 1.0000 Rp 198,755.20 Rp 198,755.20
2 Cylinder set 1.0000 Rp 107,520.00 Rp 107,520.00
3 Mortise Lock set 1.0000 Rp 240,128.00 Rp 240,128.00
4 Engsel pintu bh 3.0000 Rp 83,563.20 Rp 250,689.60
5 Door closer bh 1.0000 Rp 477,568.00 Rp 477,568.00
6 Kick plat T=2 mm lebar 20cm m² 0.1800 Rp 235,000.00 Rp 42,300.00

Jumlah harga persatuan pekerjaan Rp 4,470,698.66


Biaya umum dan Keuntungan 10% Rp 447,069.87
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 4,917,768.53
12 1 unit Pemasangan Pintu type B Uk. 900 x 2150 mm + Bouvenlight +2850 AFFL Rp 4,486,401.00
-Frame Allumunium
1 Pemasangan alumunium kusen pintu m' 5.2000 Rp 170,501.00 Rp 886,605.20
'-Daun Pintu
1 Daun Pintu Frame kayu meranti, PVC laminated Sheet uk. 900 x 2100. bh 1.0000 Rp 1,688,500.00 Rp 1,688,500.00
+ kaca 8 mm (200 x 700 mm)
2 Pemasangan Kaca clear 6 mm m² 0.5400 Rp 345,334.00 Rp 186,480.36
-Aksesories & Hardware
1 Lever Handle LHTR 0017 SSS set 1.0000 Rp 198,755.20 Rp 198,755.20
2 Cylinder set 1.0000 Rp 107,520.00 Rp 107,520.00
3 Mortise Lock set 1.0000 Rp 240,128.00 Rp 240,128.00
4 Engsel pintu bh 3.0000 Rp 83,563.20 Rp 250,689.60
5 Door closer bh 1.0000 Rp 477,568.00 Rp 477,568.00
6 Kick plat T=2 mm lebar 20cm m² 0.1800 Rp 235,000.00 Rp 42,300.00

Jumlah harga persatuan pekerjaan Rp 4,078,546.36


Biaya umum dan Keuntungan 10% Rp 407,854.64
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 4,486,401.00
13 1 unit Pemasangan Pintu type B Uk. 1200x2150 mm Rp 4,880,003.04
-Frame Allumunium
1 Pemasangan alumunium kusen pintu m' 5.6000 Rp 170,501.00 Rp 954,805.60
-Daun Pintu
1 Daun Pintu Frame kayu meranti, PVC laminated Sheet uk. 1200 x 2150 bh 1.0000 Rp 2,150,500.00 Rp 2,150,500.00
+ kaca 8 mm (200 x 700 mm)
-Aksesories & Hardware
1 Lever Handle LHTR 0017 SSS set 1.0000 Rp 198,755.20 Rp 198,755.20
2 Cylinder set 1.0000 Rp 107,520.00 Rp 107,520.00
3 Mortise Lock set 1.0000 Rp 240,128.00 Rp 240,128.00
4 Engsel pintu bh 3.0000 Rp 83,563.20 Rp 250,689.60
5 Door closer set 1.0000 Rp 477,568.00 Rp 477,568.00
6 Kick plat T=2 mm lebar 20cm m² 0.2400 Rp 235,000.00 Rp 56,400.00

Jumlah harga persatuan pekerjaan Rp 4,436,366.40


Biaya umum dan Keuntungan 10% Rp 443,636.64
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 4,880,003.04
14 1 unit Pemasangan Pintu type B Uk. 2x900x2150 mm Rp 7,636,189.55
-Frame Allumunium
1 Pemasangan alumunium kusen pintu m' 6.1000 Rp 170,501.00 Rp 1,040,056.10
'-Daun Pintu
1 Daun Pintu Frame kayu meranti, PVC laminated Sheet uk. 900 x 2100. bh 2.0000 Rp 1,688,500.00 Rp 3,377,000.00
+ kaca 8 mm (200 x 700 mm)
-Aksesories & Hardware
1 Lever Handle LHTR 0017 SSS set 2.0000 Rp 198,755.20 Rp 397,510.40
2 Cylinder set 1.0000 Rp 107,520.00 Rp 107,520.00
3 Mortise Lock set 1.0000 Rp 240,128.00 Rp 240,128.00
4 Engsel pintu bh 6.0000 Rp 83,563.20 Rp 501,379.20
5 Kunci tanam Flush Bolt FB 040 S/S 8 + 18 SSS set 1.0000 Rp 238,660.80 Rp 238,660.80
6 Door closer set 2.0000 Rp 477,568.00 Rp 955,136.00
7 Kick plat T=2 mm lebar 20cm m² 0.3600 Rp 235,000.00 Rp 84,600.00

Jumlah harga persatuan pekerjaan Rp 6,941,990.50


Biaya umum dan Keuntungan 10% Rp 694,199.05
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 7,636,189.55
15 1 unit Pemasangan Pintu type B Uk. 2x900x2150 mm + Bouvenlight +2850 AFFL Rp 8,777,895.63
-Frame Allumunium
1 Pemasangan alumunium kusen pintu m' 10.0000 Rp 170,501.00 Rp 1,705,010.00
'-Daun Pintu
1 Daun Pintu Frame kayu meranti, PVC laminated Sheet uk. 900 x 2100. bh 2.0000 Rp 1,688,500.00 Rp 3,377,000.00
+ kaca 8 mm (200 x 700 mm)
2 Pemasangan Kaca clear 6 mm m² 1.0800 Rp 345,334.00 Rp 372,960.72
-Aksesories & Hardware

Analisa Harga Satuan Arsitektur - page 87 of 212


No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan
1 Lever Handle LHTR 0017 SSS set 2.0000 Rp 198,755.20 Rp 397,510.40
2 Cylinder set 1.0000 Rp 107,520.00 Rp 107,520.00
3 Mortise Lock set 1.0000 Rp 240,128.00 Rp 240,128.00
4 Engsel pintu bh 6.0000 Rp 83,563.20 Rp 501,379.20
5 Kunci tanam Flush Bolt FB 040 S/S 8 + 18 SSS set 1.0000 Rp 238,660.80 Rp 238,660.80
6 Door closer set 2.0000 Rp 477,568.00 Rp 955,136.00
7 Kick plat T=2 mm lebar 20cm m² 0.3600 Rp 235,000.00 Rp 84,600.00

Jumlah harga persatuan pekerjaan Rp 7,979,905.12


Biaya umum dan Keuntungan 10% Rp 797,990.51
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 8,777,895.63
16 1 unit Pemasangan Pintu type B Uk.1200x2150 mm (sliding) Rp 4,822,800.73
-Frame Allumunium
1 Pemasangan alumunium kusen pintu m' 5.5000 Rp 170,501.00 Rp 937,755.50
'-Daun Pintu
1 Daun Pintu Frame kayu meranti, PVC laminated Sheet uk. 1200 x 2150 bh 1.0000 Rp 2,150,500.00 Rp 2,150,500.00
+ kaca 8 mm (200 x 700 mm)
-Aksesories & Hardware
1 Lever Handle LHTR 0017 SSS set 1.0000 Rp 198,755.20 Rp 198,755.20
2 Cylinder set 1.0000 Rp 107,520.00 Rp 107,520.00
3 Mortise Lock set 1.0000 Rp 240,128.00 Rp 240,128.00
4 Rel pintu slidding door set 1.0000 Rp 749,705.60 Rp 749,705.60

Jumlah harga persatuan pekerjaan Rp 4,384,364.30


Biaya umum dan Keuntungan 10% Rp 438,436.43
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 4,822,800.73
17 1 unit Pemasangan Pintu type C Uk. 750 x 2150 mm Rp 3,245,685.14
-Frame Allumunium
1 Pemasangan alumunium kusen pintu m' 5.0500 Rp 170,501.00 Rp 861,030.05
'-Daun Pintu
1 Daun Pintu Frame kayu meranti, PVC laminated Sheet ( 750 x 2100 ) bh 1.0000 Rp 1,292,500.00 Rp 1,292,500.00
-Aksesories & Hardware
1 Lever Handle LHTR 0017 SSS set 1.0000 Rp 198,755.20 Rp 198,755.20
2 Cylinder set 1.0000 Rp 107,520.00 Rp 107,520.00
3 Mortise Lock set 1.0000 Rp 240,128.00 Rp 240,128.00
4 Engsel pintu bh 3.0000 Rp 83,563.20 Rp 250,689.60

Jumlah harga persatuan pekerjaan Rp 2,950,622.85


Biaya umum dan Keuntungan 10% Rp 295,062.29
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 3,245,685.14
18 1 unit Pemasangan Pintu type C Uk. 750 x 2150 mm + Bouvenlight +2850 AFFL Rp 3,667,675.11
-Frame Allumunium
1 Pemasangan alumunium kusen pintu m' 7.3000 Rp 170,501.00 Rp 1,244,657.30
'-Daun Pintu
1 Daun Pintu Frame kayu meranti, PVC laminated Sheet ( 750 x 2100 ) bh 1.0000 Rp 1,292,500.00 Rp 1,292,500.00
-Aksesories & Hardware
1 Lever Handle LHTR 0017 SSS set 1.0000 Rp 198,755.20 Rp 198,755.20
2 Cylinder set 1.0000 Rp 107,520.00 Rp 107,520.00
3 Mortise Lock set 1.0000 Rp 240,128.00 Rp 240,128.00
4 Engsel pintu bh 3.0000 Rp 83,563.20 Rp 250,689.60

Jumlah harga persatuan pekerjaan Rp 3,334,250.10


Biaya umum dan Keuntungan 10% Rp 333,425.01
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 3,667,675.11
19 1 unit Pemasangan Pintu type C Uk. 900 x 2150 mm Rp 3,871,742.60
-Frame Allumunium
1 Pemasangan alumunium kusen pintu m' 5.2000 Rp 170,501.00 Rp 886,605.20
'-Daun Pintu
1 Daun Pintu Frame kayu meranti, core solid balsa PVC laminated Sheet uk. 900 x 2100 bh 1.0000 Rp 1,358,500.00 Rp 1,358,500.00
-Aksesories & Hardware
1 Lever Handle LHTR 0017 SSS set 1.0000 Rp 198,755.20 Rp 198,755.20
2 Cylinder set 1.0000 Rp 107,520.00 Rp 107,520.00
3 Mortise Lock set 1.0000 Rp 240,128.00 Rp 240,128.00
4 Engsel pintu bh 3.0000 Rp 83,563.20 Rp 250,689.60
5 Door closer bh 1.0000 Rp 477,568.00 Rp 477,568.00

Jumlah harga persatuan pekerjaan Rp 3,519,766.00


Biaya umum dan Keuntungan 10% Rp 351,976.60
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 3,871,742.60
20 1 unit Pemasangan Pintu type C Uk. 900 x 2150 mm + Bouvenlight +2850 AFFL Rp 4,508,238.53
-Frame Allumunium
1 Pemasangan alumunium kusen pintu m' 7.5000 Rp 170,501.00 Rp 1,278,757.50
'-Daun Pintu
1 Daun Pintu Frame kayu meranti, core solid balsa PVC laminated Sheet uk. 900 x 2100 bh 1.0000 Rp 1,358,500.00 Rp 1,358,500.00
2 Pemasangan Kaca clear 6 mm m² 0.5400 Rp 345,334.00 Rp 186,480.36
-Aksesories & Hardware
1 Lever Handle LHTR 0017 SSS set 1.0000 Rp 198,755.20 Rp 198,755.20
2 Cylinder set 1.0000 Rp 107,520.00 Rp 107,520.00
3 Mortise Lock set 1.0000 Rp 240,128.00 Rp 240,128.00
4 Engsel pintu bh 3.0000 Rp 83,563.20 Rp 250,689.60
5 Door closer bh 1.0000 Rp 477,568.00 Rp 477,568.00

Analisa Harga Satuan Arsitektur - page 88 of 212


No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan

Jumlah harga persatuan pekerjaan Rp 4,098,398.66


Biaya umum dan Keuntungan 10% Rp 409,839.87
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 4,508,238.53
21 1 unit Pemasangan Pintu type C Uk. 1000 x 2150 mm Rp 4,519,092.60
-Frame Allumunium
1 Pemasangan alumunium kusen pintu m' 5.2000 Rp 170,501.00 Rp 886,605.20
'-Daun Pintu
1 Daun Pintu Frame kayu meranti, core solid balsa PVC laminated Sheet uk. 1000 x 2100 bh 1.0000 Rp 1,947,000.00 Rp 1,947,000.00
-Aksesories & Hardware
1 Lever Handle LHTR 0017 SSS set 1.0000 Rp 198,755.20 Rp 198,755.20
2 Cylinder set 1.0000 Rp 107,520.00 Rp 107,520.00
3 Mortise Lock set 1.0000 Rp 240,128.00 Rp 240,128.00
4 Engsel pintu bh 3.0000 Rp 83,563.20 Rp 250,689.60
5 Door closer bh 1.0000 Rp 477,568.00 Rp 477,568.00

Jumlah harga persatuan pekerjaan Rp 4,108,266.00


Biaya umum dan Keuntungan 10% Rp 410,826.60
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 4,519,092.60
22 1 unit Pemasangan Pintu type C Uk. 2x900x2150 mm Rp 6,554,602.67
-Frame Allumunium
1 Pemasangan alumunium kusen pintu m' 6.1000 Rp 170,501.00 Rp 1,040,056.10
'-Daun Pintu
1 Daun Pintu Frame kayu meranti, core solid balsa PVC laminated Sheet uk. 900 x 2100 bh 2.0000 Rp 1,358,500.00 Rp 2,717,000.00
-Aksesories & Hardware
1 Lever Handle LHTR 0017 SSS set 2.0000 Rp 198,755.20 Rp 397,510.40
2 Cylinder set 1.0000 Rp 107,520.00 Rp 107,520.00
3 Mortise Lock set 1.0000 Rp 240,128.00 Rp 240,128.00
4 Engsel pintu bh 6.0000 Rp 83,563.20 Rp 501,379.20
5 Door closer bh 2.0000 Rp 477,568.00 Rp 955,136.00

Jumlah harga persatuan pekerjaan Rp 5,958,729.70


Biaya umum dan Keuntungan 10% Rp 595,872.97
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 6,554,602.67
23 1 unit Pemasangan Pintu type C Uk. 2x900x2150 mm + Bouvenlight +2850 AFFL Rp 7,696,308.75
-Frame Allumunium
1 Pemasangan alumunium kusen pintu m' 10.0000 Rp 170,501.00 Rp 1,705,010.00
'-Daun Pintu
1 Daun Pintu Frame kayu meranti, core solid balsa PVC laminated Sheet uk. 900 x 2100 bh 2.0000 Rp 1,358,500.00 Rp 2,717,000.00
2 Pemasangan Kaca clear 6 mm m² 1.0800 Rp 345,334.00 Rp 372,960.72
-Aksesories & Hardware
1 Lever Handle LHTR 0017 SSS set 2.0000 Rp 198,755.20 Rp 397,510.40
2 Cylinder set 1.0000 Rp 107,520.00 Rp 107,520.00
3 Mortise Lock set 1.0000 Rp 240,128.00 Rp 240,128.00
4 Engsel pintu bh 6.0000 Rp 83,563.20 Rp 501,379.20
5 Door closer bh 2.0000 Rp 477,568.00 Rp 955,136.00

Jumlah harga persatuan pekerjaan Rp 6,996,644.32


Biaya umum dan Keuntungan 10% Rp 699,664.43
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 7,696,308.75
24 1 unit Pemasangan Pintu type E Uk. 700x2150 mm Rp 3,799,142.60
-Frame Allumunium
1 Pemasangan alumunium kusen pintu m' 5.2000 Rp 170,501.00 Rp 886,605.20
'-Daun Pintu
1 Daun Pintu Frame kayu meranti, PVC laminated Sheet uk. 700 x 2100 bh 1.0000 Rp 1,292,500.00 Rp 1,292,500.00
+ kaca 8 mm (700 x 1800 mm)
-Aksesories & Hardware
1 Lever Handle LHTR 0017 SSS set 1.0000 Rp 198,755.20 Rp 198,755.20
2 Cylinder set 1.0000 Rp 107,520.00 Rp 107,520.00
3 Mortise Lock set 1.0000 Rp 240,128.00 Rp 240,128.00
4 Engsel pintu bh 3.0000 Rp 83,563.20 Rp 250,689.60
5 Door closer bh 1.0000 Rp 477,568.00 Rp 477,568.00

Jumlah harga persatuan pekerjaan Rp 3,453,766.00


Biaya umum dan Keuntungan 10% Rp 345,376.60
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 3,799,142.60
25 1 unit Pemasangan Pintu type E Uk. 900x2150 mm Rp 4,234,742.60
-Frame Allumunium
1 Pemasangan alumunium kusen pintu m' 5.2000 Rp 170,501.00 Rp 886,605.20
'-Daun Pintu
1 Daun Pintu Frame kayu meranti, PVC laminated Sheet uk. 900 x 2100 bh 1.0000 Rp 1,688,500.00 Rp 1,688,500.00
+ kaca 8 mm (700 x 1800 mm)
-Aksesories & Hardware
1 Lever Handle LHTR 0017 SSS set 1.0000 Rp 198,755.20 Rp 198,755.20
2 Cylinder set 1.0000 Rp 107,520.00 Rp 107,520.00
3 Mortise Lock set 1.0000 Rp 240,128.00 Rp 240,128.00
4 Engsel pintu bh 3.0000 Rp 83,563.20 Rp 250,689.60
5 Door closer bh 1.0000 Rp 477,568.00 Rp 477,568.00

Jumlah harga persatuan pekerjaan Rp 3,849,766.00


Biaya umum dan Keuntungan 10% Rp 384,976.60

Analisa Harga Satuan Arsitektur - page 89 of 212


No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 4,234,742.60
26 1 unit Pemasangan Pintu type E Uk. 2x900x2150 mm Rp 6,755,277.87
-Frame Allumunium
1 Pemasangan alumunium kusen pintu m' 6.1000 Rp 170,501.00 Rp 1,040,056.10
'-Daun Pintu
1 Daun Pintu Frame kayu meranti, PVC laminated Sheet uk. 900 x 2100 bh 2.0000 Rp 1,688,500.00 Rp 3,377,000.00
+ kaca 8 mm (700 x 1800 mm)
-Aksesories & Hardware
1 Lever Handle LHTR 0017 SSS set 2.0000 Rp 198,755.20 Rp 397,510.40
2 Cylinder set 1.0000 Rp 107,520.00 Rp 107,520.00
3 Mortise Lock set 1.0000 Rp 240,128.00 Rp 240,128.00
4 Engsel pintu bh 6.0000 Rp 83,563.20 Rp 501,379.20
5 Door closer bh 1.0000 Rp 477,568.00 Rp 477,568.00

Jumlah harga persatuan pekerjaan Rp 6,141,161.70


Biaya umum dan Keuntungan 10% Rp 614,116.17
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 6,755,277.87
27 1 unit Pemasangan Pintu type E Uk. 900x2150 mm + Bouvenlight +2850 AFFL Rp 4,871,238.53
-Frame Allumunium
1 Pemasangan alumunium kusen pintu m' 7.5000 Rp 170,501.00 Rp 1,278,757.50
'-Daun Pintu
1 Daun Pintu Frame kayu meranti, PVC laminated Sheet uk. 900 x 2100 bh 1.0000 Rp 1,688,500.00 Rp 1,688,500.00
+ kaca 8 mm (700 x 1800 mm)
2 Pemasangan Kaca clear 6 mm m² 0.5400 Rp 345,334.00 Rp 186,480.36
-Aksesories & Hardware
1 Lever Handle LHTR 0017 SSS set 1.0000 Rp 198,755.20 Rp 198,755.20
2 Cylinder set 1.0000 Rp 107,520.00 Rp 107,520.00
3 Mortise Lock set 1.0000 Rp 240,128.00 Rp 240,128.00
4 Engsel pintu bh 3.0000 Rp 83,563.20 Rp 250,689.60
5 Door closer bh 1.0000 Rp 477,568.00 Rp 477,568.00

Jumlah harga persatuan pekerjaan Rp 4,428,398.66


Biaya umum dan Keuntungan 10% Rp 442,839.87
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 4,871,238.53
28 1 unit Pemasangan Pintu type E Uk. 2x900x2150 mm + Bouvenlight +2850 AFFL Rp 7,896,983.95
-Frame Allumunium
1 Pemasangan alumunium kusen pintu m' 10.0000 Rp 170,501.00 Rp 1,705,010.00
'-Daun Pintu
1 Daun Pintu Frame kayu meranti, PVC laminated Sheet uk. 900 x 2100 bh 2.0000 Rp 1,688,500.00 Rp 3,377,000.00
+ kaca 8 mm (700 x 1800 mm)
2 Pemasangan Kaca clear 6 mm m² 1.0800 Rp 345,334.00 Rp 372,960.72
-Aksesories & Hardware
1 Lever Handle LHTR 0017 SSS set 2.0000 Rp 198,755.20 Rp 397,510.40
2 Cylinder set 1.0000 Rp 107,520.00 Rp 107,520.00
3 Mortise Lock set 1.0000 Rp 240,128.00 Rp 240,128.00
4 Engsel pintu bh 6.0000 Rp 83,563.20 Rp 501,379.20
5 Door closer bh 1.0000 Rp 477,568.00 Rp 477,568.00

Jumlah harga persatuan pekerjaan Rp 7,179,076.32


Biaya umum dan Keuntungan 10% Rp 717,907.63
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 7,896,983.95
29 1 unit Pemasangan Pintu type GUD Uk. 2x550x2150 mm Rp 6,755,277.87
-Frame Allumunium
1 Pemasangan alumunium kusen pintu m' 6.1000 Rp 170,501.00 Rp 1,040,056.10
'-Daun Pintu
1 Daun Pintu Frame kayu meranti, PVC laminated Sheet uk. 900 x 2100 bh 2.0000 Rp 1,688,500.00 Rp 3,377,000.00
+ kaca 8 mm (700 x 1800 mm)
-Aksesories & Hardware
1 Lever Handle LHTR 0017 SSS set 2.0000 Rp 198,755.20 Rp 397,510.40
2 Cylinder set 1.0000 Rp 107,520.00 Rp 107,520.00
3 Mortise Lock set 1.0000 Rp 240,128.00 Rp 240,128.00
4 Engsel pintu bh 6.0000 Rp 83,563.20 Rp 501,379.20
5 Door closer bh 1.0000 Rp 477,568.00 Rp 477,568.00

Jumlah harga persatuan pekerjaan Rp 6,141,161.70


Biaya umum dan Keuntungan 10% Rp 614,116.17
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 6,755,277.87
30 1 unit Pemasangan Pintu type M Uk. 900x2150 mm Rp 4,234,742.60
-Frame Allumunium
1 Pemasangan alumunium kusen pintu m' 5.2000 Rp 170,501.00 Rp 886,605.20
'-Daun Pintu
1 Daun Pintu Frame kayu meranti, PVC laminated Sheet uk. 900 x 2100 bh 1.0000 Rp 1,688,500.00 Rp 1,688,500.00
+ kaca 8 mm (700 x 1800 mm)
-Aksesories & Hardware
1 Lever Handle LHTR 0017 SSS set 1.0000 Rp 198,755.20 Rp 198,755.20
2 Cylinder set 1.0000 Rp 107,520.00 Rp 107,520.00
3 Mortise Lock set 1.0000 Rp 240,128.00 Rp 240,128.00
4 Engsel pintu set 3.0000 Rp 83,563.20 Rp 250,689.60
5 Door closer set 1.0000 Rp 477,568.00 Rp 477,568.00

Jumlah harga persatuan pekerjaan Rp 3,849,766.00

Analisa Harga Satuan Arsitektur - page 90 of 212


No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan
Biaya umum dan Keuntungan 10% Rp 384,976.60
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 4,234,742.60
31 1 unit Pemasangan Pintu type M Uk. 900x2150 mm + Bouvenlight +2850 AFFL Rp 4,871,238.53
-Frame Allumunium
1 Pemasangan alumunium kusen pintu m' 7.5000 Rp 170,501.00 Rp 1,278,757.50
'-Daun Pintu
1 Daun Pintu Frame kayu meranti, PVC laminated Sheet uk. 900 x 2100 bh 1.0000 Rp 1,688,500.00 Rp 1,688,500.00
+ kaca 8 mm (700 x 1800 mm)
2 Pemasangan Kaca clear 6 mm m² 0.5400 Rp 345,334.00 Rp 186,480.36
-Aksesories & Hardware
1 Lever Handle LHTR 0017 SSS set 1.0000 Rp 198,755.20 Rp 198,755.20
2 Cylinder set 1.0000 Rp 107,520.00 Rp 107,520.00
3 Mortise Lock set 1.0000 Rp 240,128.00 Rp 240,128.00
4 Engsel pintu set 3.0000 Rp 83,563.20 Rp 250,689.60
5 Door closer set 1.0000 Rp 477,568.00 Rp 477,568.00

Jumlah harga persatuan pekerjaan Rp 4,428,398.66


Biaya umum dan Keuntungan 10% Rp 442,839.87
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 4,871,238.53
32 1 unit Pemasangan Pintu type M Uk. 2x900x2150 mm Rp 7,636,189.55
-Frame Allumunium
1 Pemasangan alumunium kusen pintu m' 6.1000 Rp 170,501.00 Rp 1,040,056.10
'-Daun Pintu
1 Daun Pintu Frame kayu meranti, PVC laminated Sheet uk. 900 x 2100 bh 2.0000 Rp 1,688,500.00 Rp 3,377,000.00
+ kaca 8 mm (700 x 1800 mm)
-Aksesories & Hardware
1 Lever Handle LHTR 0017 SSS set 2.0000 Rp 198,755.20 Rp 397,510.40
2 Cylinder set 1.0000 Rp 107,520.00 Rp 107,520.00
3 Mortise Lock set 1.0000 Rp 240,128.00 Rp 240,128.00
4 Engsel pintu bh 6.0000 Rp 83,563.20 Rp 501,379.20
5 Kunci tanam Flush Bolt FB 040 S/S 8 + 18 SSS set 1.0000 Rp 238,660.80 Rp 238,660.80
6 Door closer set 2.0000 Rp 477,568.00 Rp 955,136.00
7 Kick plat T=2 mm lebar 20cm m² 0.3600 Rp 235,000.00 Rp 84,600.00

Jumlah harga persatuan pekerjaan Rp 6,941,990.50


Biaya umum dan Keuntungan 10% Rp 694,199.05
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 7,636,189.55
33 1 unit Pemasangan Pintu Besi Type A-HM uk. 600 x 1250 mm Rp 2,905,925.00
SINGLE STEEL DOOR uk. 600x1250 (Plat daun 0.8mm, plat kusen 1.5mm) + Accesories unit 1.0000 Rp 2,337,500.00 Rp 2,337,500.00
Hardware :
- Handle pintu
- Mortice lock + cylinder
- Engsel
Tenaga Kerja :
1 Pekerja oh 1.0000 Rp 136,000.00 Rp 136,000.00
2 Tukang oh 1.0000 Rp 145,000.00 Rp 145,000.00
3 Kepala tukang oh 0.1000 Rp 155,000.00 Rp 15,500.00
4 Mandor oh 0.0500 Rp 155,000.00 Rp 7,750.00
Jumlah harga persatuan pekerjaan Rp 2,641,750.00
Biaya umum dan Keuntungan 10% Rp 264,175.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 2,905,925.00
34 1 unit Pemasangan Pintu Besi Type A-HM uk. 2 x 600 x 1250 mm Rp 5,577,577.50
SINGLE STEEL DOOR uk. 600x1250 (Plat daun 0.8mm, plat kusen 1.5mm) + Accesories unit 2.0000 Rp 2,337,500.00 Rp 4,675,000.00
Hardware :
- Handle pintu
- Mortice lock + cylinder
- Engsel
Tenaga Kerja :
1 Pekerja oh 1.3000 Rp 136,000.00 Rp 176,800.00
2 Tukang oh 1.3000 Rp 145,000.00 Rp 188,500.00
3 Kepala tukang oh 0.1300 Rp 155,000.00 Rp 20,150.00
4 Mandor oh 0.0650 Rp 155,000.00 Rp 10,075.00
Jumlah harga persatuan pekerjaan Rp 5,070,525.00
Biaya umum dan Keuntungan 10% Rp 507,052.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 5,577,577.50
35 1 unit Pemasangan Pintu Besi Type A-HM uk. 900 x 2150 mm Rp 8,275,877.50
SINGLE STEEL DOOR uk. 900x2150 mm (Plat daun 0.8mm, plat kusen 1.5mm) + Accessories
unit 1.0000 Rp 7,128,000.00 Rp 7,128,000.00
Hardware :
- Handle pintu
- Mortice lock + cylinder
- Engsel
Tenaga Kerja :
1 Pekerja oh 1.3000 Rp 136,000.00 Rp 176,800.00
2 Tukang oh 1.3000 Rp 145,000.00 Rp 188,500.00
3 Kepala tukang oh 0.1300 Rp 155,000.00 Rp 20,150.00
4 Mandor oh 0.0650 Rp 155,000.00 Rp 10,075.00
Jumlah harga persatuan pekerjaan Rp 7,523,525.00
Biaya umum dan Keuntungan 10% Rp 752,352.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 8,275,877.50
36 1 unit Pemasangan Pintu Besi Type A-HM uk. 1200 x 2150 mm Rp 8,275,877.50
SINGLE STEEL DOOR uk. 900x2150 mm (Plat daun 0.8mm, plat kusen 1.5mm) + Accessories
unit 1.0000 Rp 7,128,000.00 Rp 7,128,000.00

Analisa Harga Satuan Arsitektur - page 91 of 212


No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan
Hardware :
- Handle pintu
- Mortice lock + cylinder
- Engsel
Tenaga Kerja :
1 Pekerja oh 1.3000 Rp 136,000.00 Rp 176,800.00
2 Tukang oh 1.3000 Rp 145,000.00 Rp 188,500.00
3 Kepala tukang oh 0.1300 Rp 155,000.00 Rp 20,150.00
4 Mandor oh 0.0650 Rp 155,000.00 Rp 10,075.00
Jumlah harga persatuan pekerjaan Rp 7,523,525.00
Biaya umum dan Keuntungan 10% Rp 752,352.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 8,275,877.50
37 1 unit Pemasangan Pintu Besi Type A-HM uk. 1200 x 2150 mm (Tahan Api) Rp 9,510,077.50
SINGLE STEEL DOOR uk. 1200x2150 mm (Tahan Api+panic handle) (Plat daun 0.8mm, plat
unit kusen 1.5mm)
1.0000 Rp 8,250,000.00 Rp 8,250,000.00
Hardware :
- Handle pintu
- Mortice lock + cylinder
- Engsel
Tenaga Kerja :
1 Pekerja oh 1.3000 Rp 136,000.00 Rp 176,800.00
2 Tukang oh 1.3000 Rp 145,000.00 Rp 188,500.00
3 Kepala tukang oh 0.1300 Rp 155,000.00 Rp 20,150.00
4 Mandor oh 0.0650 Rp 155,000.00 Rp 10,075.00
Jumlah harga persatuan pekerjaan Rp 8,645,525.00
Biaya umum dan Keuntungan 10% Rp 864,552.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 9,510,077.50
38 1 unit Pemasangan Pintu Besi Type A-HM uk. 2 x 900 x 2150 mm Rp 12,408,412.50
SINGLE STEEL DOOR uk. 2x900x2150 mm (Plat daun 0.8mm, plat kusen 1.5mm) + Accessories
unit 1.0000 Rp 10,824,000.00 Rp 10,824,000.00
Hardware :
- Handle pintu
- Mortice lock + cylinder
- Engsel
- Kunci tanam
Tenaga Kerja :
1 Pekerja oh 1.5000 Rp 136,000.00 Rp 204,000.00
2 Tukang oh 1.5000 Rp 145,000.00 Rp 217,500.00
3 Kepala tukang oh 0.1500 Rp 155,000.00 Rp 23,250.00
4 Mandor oh 0.0750 Rp 155,000.00 Rp 11,625.00
Jumlah harga persatuan pekerjaan Rp 11,280,375.00
Biaya umum dan Keuntungan 10% Rp 1,128,037.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 12,408,412.50
39 1 unit Pemasangan Pintu Besi Type C-HM uk. 900 x 2150 mm Rp 8,275,877.50
SINGLE STEEL DOOR uk. 900x2150 with Lover (Plat daun 0.8mm, plat kusen 1.5mm) + unit
Accessories 1.0000 Rp 7,128,000.00 Rp 7,128,000.00
Hardware :
- Handle pintu
- Mortice lock + cylinder
- Engsel
Tenaga Kerja :
1 Pekerja oh 1.3000 Rp 136,000.00 Rp 176,800.00
2 Tukang oh 1.3000 Rp 145,000.00 Rp 188,500.00
3 Kepala tukang oh 0.1300 Rp 155,000.00 Rp 20,150.00
4 Mandor oh 0.0650 Rp 155,000.00 Rp 10,075.00
Jumlah harga persatuan pekerjaan Rp 7,523,525.00
Biaya umum dan Keuntungan 10% Rp 752,352.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 8,275,877.50
40 1 unit Pemasangan Pintu Besi Type C-HM uk. 2 x 900 x 2150 mm Rp 12,408,412.50
SINGLE STEEL DOOR uk. 2x900x2150 with Lover (Plat daun 0.8mm, plat kusen 1.5mm) unit
+ Accessories 1.0000 Rp 10,824,000.00 Rp 10,824,000.00
Hardware :
- Handle pintu
- Mortice lock + cylinder
- Engsel
- Kunci tanam
Tenaga Kerja :
1 Pekerja oh 1.5000 Rp 136,000.00 Rp 204,000.00
2 Tukang oh 1.5000 Rp 145,000.00 Rp 217,500.00
3 Kepala tukang oh 0.1500 Rp 155,000.00 Rp 23,250.00
4 Mandor oh 0.0750 Rp 155,000.00 Rp 11,625.00
Jumlah harga persatuan pekerjaan Rp 11,280,375.00
Biaya umum dan Keuntungan 10% Rp 1,128,037.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 12,408,412.50
41 1 unit Pemasangan Pintu Besi Type B-HM, HM (uk. 900 x 2150) Rp 8,275,877.50
SINGLE STEEL DOOR uk. 900x2150 mm (Plat daun 0.8mm, plat kusen 1.5mm) + Accessories
unit 1.0000 Rp 7,128,000.00 Rp 7,128,000.00
Hardware :
- Handle pintu
- Mortice lock + cylinder
- Engsel
Tenaga Kerja :
1 Pekerja oh 1.3000 Rp 136,000.00 Rp 176,800.00
2 Tukang oh 1.3000 Rp 145,000.00 Rp 188,500.00
3 Kepala tukang oh 0.1300 Rp 155,000.00 Rp 20,150.00
4 Mandor oh 0.0650 Rp 155,000.00 Rp 10,075.00

Analisa Harga Satuan Arsitektur - page 92 of 212


No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan
Jumlah harga persatuan pekerjaan Rp 7,523,525.00
Biaya umum dan Keuntungan 10% Rp 752,352.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 8,275,877.50
42 1 unit Pintu Type B, HM Radiation Door (uk. 900 x 2150) Rp 29,917,112.50
- Pintu Radiation Door lapis PB 2mm, uk. 900 x 2150 mm (Zeltech) unit 1.0000 Rp 26,741,000.00 Rp 26,741,000.00
- Lockcase
- Cylinder
- Handle + Backplate
- Door Closer
Tenaga Kerja :
1 Pekerja oh 1.5000 Rp 136,000.00 Rp 204,000.00
2 Tukang oh 1.5000 Rp 145,000.00 Rp 217,500.00
3 Kepala tukang oh 0.1500 Rp 155,000.00 Rp 23,250.00
4 Mandor oh 0.0750 Rp 155,000.00 Rp 11,625.00
Jumlah harga persatuan pekerjaan Rp 27,197,375.00
Biaya umum dan Keuntungan 10% Rp 2,719,737.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 29,917,112.50
43 1 unit Pintu Type B, HM Radiation Door (uk. 2x 900 x 2150) Rp 57,636,150.00
- Pintu Radiation Door lapis PB 2mm, uk. 2 x 900 x 2150 mm (Zeltech) unit 1.0000 Rp 51,788,000.00 Rp 51,788,000.00
- Lockcase
- Cylinder
- Handle + Backplate
- Door Closer
Tenaga Kerja :
1 Pekerja oh 2.0000 Rp 136,000.00 Rp 272,000.00
2 Tukang oh 2.0000 Rp 145,000.00 Rp 290,000.00
3 Kepala tukang oh 0.2000 Rp 155,000.00 Rp 31,000.00
4 Mandor oh 0.1000 Rp 155,000.00 Rp 15,500.00
Jumlah harga persatuan pekerjaan Rp 52,396,500.00
Biaya umum dan Keuntungan 10% Rp 5,239,650.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 57,636,150.00
PEKERJAAN KUSEN DAN DAUN JENDELA
GEDUNG A
1 1 m² Jendela curtain wall system Rp 1,274,460.00
-Material terpasang
- Tiang Vertikal (mullion). Uk. 40 x 100 tebal 2 mm m' 2.0000 Rp 95,376.00 Rp 190,752.00
- Cover mullion (omega) tebal 1 mm m' 2.0000 Rp 50,496.00 Rp 100,992.00
- Ambang Transome tebal 1,2 mm m' 2.0000 Rp 72,936.00 Rp 145,872.00
- Bracket pcs 2.0000 Rp 16,836.00 Rp 33,672.00
- Kaca Reflected 8 mm m² 1.0000 Rp 387,600.00 Rp 387,600.00
- List Karet m' 8.0000 Rp 5,616.00 Rp 44,928.00
- Sealent m' 8.0000 Rp 6,732.00 Rp 53,856.00
- Paku Skrup bh 16.0000 Rp 336.00 Rp 5,376.00
- Pisher bh 4.0000 Rp 1,680.00 Rp 6,720.00
- Dinabold bh 4.0000 Rp 2,808.00 Rp 11,232.00
-Ongkos Pasang dan Material Bantu ls 1.0000 Rp 177,600.00 Rp 177,600.00
Jumlah harga persatuan pekerjaan Rp 1,158,600.00
Biaya umum dan Keuntungan 10% Rp 115,860.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,274,460.00
2 1 unit Jendela Tipe DW-2 Rp 1,439,867.42
-Allumunium
1 Pemasangan alumunium kusen jendela m' 5.7480 Rp 170,501.00 Rp 980,039.75
-Kaca
1 Pemasangan Kaca clear 6 mm m² 0.9525 Rp 345,334.00 Rp 328,930.64

Jumlah harga persatuan pekerjaan Rp 1,308,970.38


Biaya umum dan Keuntungan 10% Rp 130,897.04
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,439,867.42
3 1 unit Jendela Tipe DW-2A Rp 1,653,802.18
-Allumunium
1 Pemasangan alumunium kusen jendela m' 5.4000 Rp 170,501.00 Rp 920,705.40
-Kaca
1 Pemasangan Kaca clear 6 mm m² 1.6875 Rp 345,334.00 Rp 582,751.13

Jumlah harga persatuan pekerjaan Rp 1,503,456.53


Biaya umum dan Keuntungan 10% Rp 150,345.65
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,653,802.18
4 1 unit Jendela Tipe DW-2A' Rp 2,928,706.85
-Allumunium
1 Pemasangan alumunium kusen jendela m' 8.4000 Rp 170,501.00 Rp 1,432,208.40
-Kaca
1 Pemasangan Kaca clear 6 mm m² 3.5625 Rp 345,334.00 Rp 1,230,252.38

Jumlah harga persatuan pekerjaan Rp 2,662,460.78


Biaya umum dan Keuntungan 10% Rp 266,246.08
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 2,928,706.85
5 1 unit Jendela Tipe DW-4 Rp 4,625,005.85
-Allumunium
1 Pemasangan alumunium kusen jendela m' 13.9000 Rp 170,501.00 Rp 2,369,963.90
-Kaca
1 Pemasangan Kaca clear 6 mm m² 5.3125 Rp 345,334.00 Rp 1,834,586.88

Analisa Harga Satuan Arsitektur - page 93 of 212


No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan

Jumlah harga persatuan pekerjaan Rp 4,204,550.78


Biaya umum dan Keuntungan 10% Rp 420,455.08
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 4,625,005.85
6 1 unit Jendela Tipe W-3 Rp 3,265,107.53
-Allumunium
1 Pemasangan alumunium kusen jendela m' 10.7000 Rp 170,501.00 Rp 1,824,360.70
-Kaca
1 Pemasangan Kaca clear 6 mm m² 3.3125 Rp 345,334.00 Rp 1,143,918.88

Jumlah harga persatuan pekerjaan Rp 2,968,279.58


Biaya umum dan Keuntungan 10% Rp 296,827.96
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 3,265,107.53
7 1 unit Jendela Tipe DW-2IA Rp 2,131,466.46
-Allumunium
1 Pemasangan alumunium kusen jendela m' 6.5240 Rp 170,501.00 Rp 1,112,348.52
-Kaca
1 Pemasangan Kaca clear 6 mm m² 2.3900 Rp 345,334.00 Rp 825,348.26

Jumlah harga persatuan pekerjaan Rp 1,937,696.78


Biaya umum dan Keuntungan 10% Rp 193,769.68
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 2,131,466.46
8 1 unit Jendela Tipe DW-2IA' Rp 2,638,028.59
-Allumunium
1 Pemasangan alumunium kusen jendela m' 7.7160 Rp 170,501.00 Rp 1,315,585.72
-Kaca
1 Pemasangan Kaca clear 6 mm m² 3.1350 Rp 345,334.00 Rp 1,082,622.09

Jumlah harga persatuan pekerjaan Rp 2,398,207.81


Biaya umum dan Keuntungan 10% Rp 239,820.78
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 2,638,028.59
9 1 unit Jendela Tipe DW-3A Rp 3,606,869.06
-Allumunium
1 Pemasangan alumunium kusen jendela m' 10.7500 Rp 170,501.00 Rp 1,832,885.75
-Kaca
1 Pemasangan Kaca clear 6 mm m² 4.1875 Rp 345,334.00 Rp 1,446,086.13

Jumlah harga persatuan pekerjaan Rp 3,278,971.88


Biaya umum dan Keuntungan 10% Rp 327,897.19
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 3,606,869.06
10 1 unit Jendela Tipe W-3A Rp 3,562,585.29
-Allumunium
1 Pemasangan alumunium kusen jendela m' 11.4000 Rp 170,501.00 Rp 1,943,711.40
-Kaca
1 Pemasangan Kaca clear 6 mm m² 3.7500 Rp 345,334.00 Rp 1,295,002.50

Jumlah harga persatuan pekerjaan Rp 3,238,713.90


Biaya umum dan Keuntungan 10% Rp 323,871.39
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 3,562,585.29
11 1 unit Jendela Tipe DW-3A' Rp 3,755,607.94
-Allumunium
1 Pemasangan alumunium kusen jendela m' 11.1000 Rp 170,501.00 Rp 1,892,561.10
-Kaca
1 Pemasangan Kaca clear 6 mm m² 4.4063 Rp 345,334.00 Rp 1,521,627.94

Jumlah harga persatuan pekerjaan Rp 3,414,189.04


Biaya umum dan Keuntungan 10% Rp 341,418.90
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 3,755,607.94
12 1 unit Jendela Tipe DW-2A" Rp 2,228,359.22
-Allumunium
1 Pemasangan alumunium kusen jendela m' 6.7520 Rp 170,501.00 Rp 1,151,222.75
-Kaca
1 Pemasangan Kaca clear 6 mm m² 2.5325 Rp 345,334.00 Rp 874,558.36

Jumlah harga persatuan pekerjaan Rp 2,025,781.11


Biaya umum dan Keuntungan 10% Rp 202,578.11
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 2,228,359.22
13 1 unit Jendela Tipe DW-1 Rp 1,230,620.90
-Allumunium
1 Pemasangan alumunium kusen jendela m' 3.6500 Rp 170,501.00 Rp 622,328.65
-Kaca
1 Pemasangan Kaca clear 6 mm m² 1.4375 Rp 345,334.00 Rp 496,417.63

Jumlah harga persatuan pekerjaan Rp 1,118,746.28


Biaya umum dan Keuntungan 10% Rp 111,874.63
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,230,620.90
14 1 unit Jendela Tipe DW-6A Rp 7,256,234.95
-Allumunium
1 Pemasangan alumunium kusen jendela m' 21.6000 Rp 170,501.00 Rp 3,682,821.60
-Kaca
1 Pemasangan Kaca clear 6 mm m² 8.4375 Rp 345,334.00 Rp 2,913,755.63

Analisa Harga Satuan Arsitektur - page 94 of 212


No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan

Jumlah harga persatuan pekerjaan Rp 6,596,577.23


Biaya umum dan Keuntungan 10% Rp 659,657.72
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 7,256,234.95
15 1 unit Jendela Tipe BV-4E Rp 3,448,506.06
-Allumunium
1 Pemasangan alumunium kusen jendela m' 11.0040 Rp 170,501.00 Rp 1,876,193.00
-Kaca
1 Pemasangan Kaca tinted 6 mm m² 2.2512 Rp 559,174.00 Rp 1,258,812.51

Jumlah harga persatuan pekerjaan Rp 3,135,005.51


Biaya umum dan Keuntungan 10% Rp 313,500.55
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 3,448,506.06
16 1 unit Jendela Tipe BV-2E Rp 1,584,508.57
-Allumunium
1 Pemasangan alumunium kusen jendela m' 5.3000 Rp 170,501.00 Rp 903,655.30
-Kaca
1 Pemasangan Kaca tinted 6 mm m² 0.9600 Rp 559,174.00 Rp 536,807.04

Jumlah harga persatuan pekerjaan Rp 1,440,462.34


Biaya umum dan Keuntungan 10% Rp 144,046.23
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,584,508.57
17 1 unit Jendela Tipe W-4E Rp 15,301,323.69
-Allumunium
1 Pemasangan alumunium kusen jendela m' 31.7500 Rp 170,501.00 Rp 5,413,406.75
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 11.4750 Rp 740,469.50 Rp 8,496,887.51

Jumlah harga persatuan pekerjaan Rp 13,910,294.26


Biaya umum dan Keuntungan 10% Rp 1,391,029.43
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 15,301,323.69
18 1 unit Jendela Tipe W-1E Rp 3,640,054.45
-Allumunium
1 Pemasangan alumunium kusen jendela m' 10.0000 Rp 170,501.00 Rp 1,705,010.00
-Kaca
1 Pemasangan Kaca tinted 6 mm m² 2.8688 Rp 559,174.00 Rp 1,604,130.41

Jumlah harga persatuan pekerjaan Rp 3,309,140.41


Biaya umum dan Keuntungan 10% Rp 330,914.04
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 3,640,054.45
19 1 unit Jendela Tipe W-3E Rp 8,565,671.20
-Allumunium
1 Pemasangan alumunium kusen jendela m' 20.2000 Rp 170,501.00 Rp 3,444,120.20
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 5.8650 Rp 740,469.50 Rp 4,342,853.62

Jumlah harga persatuan pekerjaan Rp 7,786,973.82


Biaya umum dan Keuntungan 10% Rp 778,697.38
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 8,565,671.20
20 1 unit Jendela Tipe W-5E Rp 17,796,144.16
-Allumunium
1 Pemasangan alumunium kusen jendela m' 37.3000 Rp 170,501.00 Rp 6,359,687.30
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 13.2600 Rp 740,469.50 Rp 9,818,625.57

Jumlah harga persatuan pekerjaan Rp 16,178,312.87


Biaya umum dan Keuntungan 10% Rp 1,617,831.29
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 17,796,144.16
21 1 unit Jendela Tipe W-2E Rp 6,070,850.73
-Allumunium
1 Pemasangan alumunium kusen jendela m' 14.6500 Rp 170,501.00 Rp 2,497,839.65
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 4.0800 Rp 740,469.50 Rp 3,021,115.56

Jumlah harga persatuan pekerjaan Rp 5,518,955.21


Biaya umum dan Keuntungan 10% Rp 551,895.52
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 6,070,850.73
22 1 unit Jendela Tipe W-6E Rp 18,164,894.17
-Allumunium
1 Pemasangan alumunium kusen jendela m' 39.8420 Rp 170,501.00 Rp 6,793,100.84
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 13.1274 Rp 740,469.50 Rp 9,720,439.31

Jumlah harga persatuan pekerjaan Rp 16,513,540.16


Biaya umum dan Keuntungan 10% Rp 1,651,354.02
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 18,164,894.17
23 1 unit Jendela Tipe CW-1E Rp 7,540,367.96
-Allumunium
1 Pemasangan alumunium kusen jendela m' 18.4060 Rp 170,501.00 Rp 3,138,241.41
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 5.0193 Rp 740,469.50 Rp 3,716,638.56

Analisa Harga Satuan Arsitektur - page 95 of 212


No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan

Jumlah harga persatuan pekerjaan Rp 6,854,879.97


Biaya umum dan Keuntungan 10% Rp 685,488.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 7,540,367.96
24 1 unit Jendela Tipe CW-2E Rp 20,334,962.99
-Allumunium
1 Pemasangan alumunium kusen jendela m' 41.0000 Rp 170,501.00 Rp 6,990,541.00
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 15.5250 Rp 740,469.50 Rp 11,495,788.99

Jumlah harga persatuan pekerjaan Rp 18,486,329.99


Biaya umum dan Keuntungan 10% Rp 1,848,633.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 20,334,962.99
GEDUNG B
1 1 unit Jendela Tipe W-1I Rp 1,292,579.19
-Allumunium
1 Pemasangan alumunium kusen jendela m' 4.5500 Rp 170,501.00 Rp 775,779.55
-Kaca
1 Pemasangan Kaca clear 6 mm m² 1.1563 Rp 345,334.00 Rp 399,292.44

Jumlah harga persatuan pekerjaan Rp 1,175,071.99


Biaya umum dan Keuntungan 10% Rp 117,507.20
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,292,579.19
2 1 unit Jendela Tipe W-2I Rp 2,331,964.39
-Allumunium
1 Pemasangan alumunium kusen jendela m' 7.7500 Rp 170,501.00 Rp 1,321,382.75
-Kaca
1 Pemasangan Kaca clear 6 mm m² 2.3125 Rp 345,334.00 Rp 798,584.88

Jumlah harga persatuan pekerjaan Rp 2,119,967.63


Biaya umum dan Keuntungan 10% Rp 211,996.76
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 2,331,964.39
3 1 unit Jendela Tipe DW-2I Rp 1,563,821.93
-Allumunium
1 Pemasangan alumunium kusen jendela m' 5.3000 Rp 170,501.00 Rp 903,655.30
-Kaca
1 Pemasangan Kaca clear 6 mm m² 1.5000 Rp 345,334.00 Rp 518,001.00

Jumlah harga persatuan pekerjaan Rp 1,421,656.30


Biaya umum dan Keuntungan 10% Rp 142,165.63
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,563,821.93
4 1 unit Jendela Tipe DW-2IA Rp 1,696,299.00
-Allumunium
1 Pemasangan alumunium kusen jendela m' 5.5000 Rp 170,501.00 Rp 937,755.50
-Kaca
1 Pemasangan Kaca clear 6 mm m² 1.7500 Rp 345,334.00 Rp 604,334.50

Jumlah harga persatuan pekerjaan Rp 1,542,090.00


Biaya umum dan Keuntungan 10% Rp 154,209.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,696,299.00
5 1 unit Jendela Tipe DW-4I Rp 3,902,559.87
-Allumunium
1 Pemasangan alumunium kusen jendela m' 12.2000 Rp 170,501.00 Rp 2,080,112.20
-Kaca
1 Pemasangan Kaca clear 6 mm m² 4.2500 Rp 345,334.00 Rp 1,467,669.50

Jumlah harga persatuan pekerjaan Rp 3,547,781.70


Biaya umum dan Keuntungan 10% Rp 354,778.17
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 3,902,559.87
6 1 unit Jendela Tipe DW-2IB Rp 1,143,840.31
-Allumunium
1 Pemasangan alumunium kusen jendela m' 4.2000 Rp 170,501.00 Rp 716,104.20
-Kaca
1 Pemasangan Kaca clear 6 mm m² 0.9375 Rp 345,334.00 Rp 323,750.63

Jumlah harga persatuan pekerjaan Rp 1,039,854.83


Biaya umum dan Keuntungan 10% Rp 103,985.48
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,143,840.31
7 1 unit Jendela Tipe DW-4IA Rp 3,817,566.23
-Allumunium
1 Pemasangan alumunium kusen jendela m' 12.0000 Rp 170,501.00 Rp 2,046,012.00
-Kaca
1 Pemasangan Kaca clear 6 mm m² 4.1250 Rp 345,334.00 Rp 1,424,502.75

Jumlah harga persatuan pekerjaan Rp 3,470,514.75


Biaya umum dan Keuntungan 10% Rp 347,051.48
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 3,817,566.23
8 1 unit Jendela Tipe DW-2E Rp 4,001,085.68
-Allumunium
1 Pemasangan alumunium kusen jendela m' 11.2100 Rp 170,501.00 Rp 1,911,316.21
-Kaca

Analisa Harga Satuan Arsitektur - page 96 of 212


No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan
1 Pemasangan Kaca tinted 8 mm m² 2.3310 Rp 740,469.50 Rp 1,726,034.40

Jumlah harga persatuan pekerjaan Rp 3,637,350.61


Biaya umum dan Keuntungan 10% Rp 363,735.06
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 4,001,085.68
9 1 unit Jendela Tipe W-1E Rp 4,212,155.07
-Allumunium
1 Pemasangan alumunium kusen jendela m' 10.0000 Rp 170,501.00 Rp 1,705,010.00
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 2.8688 Rp 740,469.50 Rp 2,124,221.88

Jumlah harga persatuan pekerjaan Rp 3,829,231.88


Biaya umum dan Keuntungan 10% Rp 382,923.19
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 4,212,155.07
10 1 unit Jendela Tipe W-2E Rp 6,070,850.73
-Allumunium
1 Pemasangan alumunium kusen jendela m' 14.6500 Rp 170,501.00 Rp 2,497,839.65
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 4.0800 Rp 740,469.50 Rp 3,021,115.56

Jumlah harga persatuan pekerjaan Rp 5,518,955.21


Biaya umum dan Keuntungan 10% Rp 551,895.52
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 6,070,850.73
11 1 unit Jendela Tipe W-3E Rp 8,568,498.42
-Allumunium
1 Pemasangan alumunium kusen jendela m' 20.2040 Rp 170,501.00 Rp 3,444,802.20
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 5.8676 Rp 740,469.50 Rp 4,344,741.81

Jumlah harga persatuan pekerjaan Rp 7,789,544.02


Biaya umum dan Keuntungan 10% Rp 778,954.40
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 8,568,498.42
12 1 unit Jendela Tipe W-7E Rp 24,906,201.10
-Allumunium
1 Pemasangan alumunium kusen jendela m' 51.4000 Rp 170,501.00 Rp 8,763,751.40
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 18.7425 Rp 740,469.50 Rp 13,878,249.60

Jumlah harga persatuan pekerjaan Rp 22,642,001.00


Biaya umum dan Keuntungan 10% Rp 2,264,200.10
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 24,906,201.10
13 1 unit Jendela Tipe W-5E Rp 17,796,144.16
-Allumunium
1 Pemasangan alumunium kusen jendela m' 37.3000 Rp 170,501.00 Rp 6,359,687.30
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 13.2600 Rp 740,469.50 Rp 9,818,625.57

Jumlah harga persatuan pekerjaan Rp 16,178,312.87


Biaya umum dan Keuntungan 10% Rp 1,617,831.29
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 17,796,144.16
14 1 unit Jendela Tipe BV-1E Rp 1,234,360.12
-Allumunium
1 Pemasangan alumunium kusen jendela m' 3.6500 Rp 170,501.00 Rp 622,328.65
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 0.6750 Rp 740,469.50 Rp 499,816.91

Jumlah harga persatuan pekerjaan Rp 1,122,145.56


Biaya umum dan Keuntungan 10% Rp 112,214.56
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,234,360.12
15 1 unit Jendela Tipe BV-1EA Rp 1,191,169.52
-Allumunium
1 Pemasangan alumunium kusen jendela m' 3.5500 Rp 170,501.00 Rp 605,278.55
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 0.6450 Rp 740,469.50 Rp 477,602.83

Jumlah harga persatuan pekerjaan Rp 1,082,881.38


Biaya umum dan Keuntungan 10% Rp 108,288.14
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,191,169.52
16 1 unit Jendela Tipe BV-3E Rp 2,663,077.95
-Allumunium
1 Pemasangan alumunium kusen jendela m' 7.7500 Rp 170,501.00 Rp 1,321,382.75
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 1.4850 Rp 740,469.50 Rp 1,099,597.21

Jumlah harga persatuan pekerjaan Rp 2,420,979.96


Biaya umum dan Keuntungan 10% Rp 242,098.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 2,663,077.95
17 1 unit Jendela Tipe BV-2E Rp 1,560,003.60
-Allumunium
1 Pemasangan alumunium kusen jendela m' 4.8000 Rp 170,501.00 Rp 818,404.80
-Kaca

Analisa Harga Satuan Arsitektur - page 97 of 212


No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan
1 Pemasangan Kaca tinted 8 mm m² 0.8100 Rp 740,469.50 Rp 599,780.30

Jumlah harga persatuan pekerjaan Rp 1,418,185.10


Biaya umum dan Keuntungan 10% Rp 141,818.51
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,560,003.60
18 1 unit Jendela Tipe LV-3E #REF!
-Allumunium
1 Pemasangan alumunium kusen jendela m' 7.4002 Rp 170,501.00 Rp 1,261,741.50
-Louvre
1 Alumunium louvre (Alexindo) m² 1.3801 #REF! #REF!

Jumlah harga persatuan pekerjaan #REF!


Biaya umum dan Keuntungan 10% #REF!
Total = Jumlah+(Biaya umum dan Keuntungan 10%) #REF!
19 1 unit Jendela Tipe LV-8E Rp 7,618,786.09
-Allumunium
1 Pemasangan alumunium kusen jendela m' 22.4008 Rp 170,501.00 Rp 3,819,358.80
-Louvre
1 Kaca tinted 8 mm m² 4.8302 Rp 643,200.00 Rp 3,106,810.37

Jumlah harga persatuan pekerjaan Rp 6,926,169.17


Biaya umum dan Keuntungan 10% Rp 692,616.92
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 7,618,786.09
20 1 unit Jendela Tipe W-4E Rp 15,301,323.69
-Allumunium
1 Pemasangan alumunium kusen jendela m' 31.7500 Rp 170,501.00 Rp 5,413,406.75
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 11.4750 Rp 740,469.50 Rp 8,496,887.51

Jumlah harga persatuan pekerjaan Rp 13,910,294.26


Biaya umum dan Keuntungan 10% Rp 1,391,029.43
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 15,301,323.69
21 1 unit Jendela Tipe W-8E Rp 27,402,152.46
-Allumunium
1 Pemasangan alumunium kusen jendela m' 56.9516 Rp 170,501.00 Rp 9,710,304.75
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 20.5285 Rp 740,469.50 Rp 15,200,742.94

Jumlah harga persatuan pekerjaan Rp 24,911,047.69


Biaya umum dan Keuntungan 10% Rp 2,491,104.77
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 27,402,152.46
22 1 unit Jendela Tipe W-2EA Rp 6,410,117.29
-Allumunium
1 Pemasangan alumunium kusen jendela m' 15.1300 Rp 170,501.00 Rp 2,579,680.13
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 4.3860 Rp 740,469.50 Rp 3,247,699.23

Jumlah harga persatuan pekerjaan Rp 5,827,379.36


Biaya umum dan Keuntungan 10% Rp 582,737.94
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 6,410,117.29
23 1 unit Jendela Tipe W-1R Rp 24,172,612.42
-Allumunium
1 Pemasangan alumunium kusen jendela m' 2.2000 Rp 170,501.00 Rp 375,102.20
-Kaca
1 Kaca anti radiasi 20 mm cm² 3,000.0 Rp 7,200.00 Rp 21,600,000.00

Jumlah harga persatuan pekerjaan Rp 21,975,102.20


Biaya umum dan Keuntungan 10% Rp 2,197,510.22
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 24,172,612.42
GEDUNG C
1 1 m² Jendela curtain wall system Rp 1,274,460.00
-Material terpasang
- Tiang Vertikal (mullion). Uk. 40 x 100 tebal 2 mm m' 2.0000 Rp 95,376.00 Rp 190,752.00
- Cover mullion (omega) tebal 1 mm m' 2.0000 Rp 50,496.00 Rp 100,992.00
- Ambang Transome tebal 1,2 mm m' 2.0000 Rp 72,936.00 Rp 145,872.00
- Bracket pcs 2.0000 Rp 16,836.00 Rp 33,672.00
- Kaca Reflected 8 mm m² 1.0000 Rp 387,600.00 Rp 387,600.00
- List Karet m' 8.0000 Rp 5,616.00 Rp 44,928.00
- Sealent m' 8.0000 Rp 6,732.00 Rp 53,856.00
- Paku Skrup bh 16.0000 Rp 336.00 Rp 5,376.00
- Pisher bh 4.0000 Rp 1,680.00 Rp 6,720.00
- Dinabold bh 4.0000 Rp 2,808.00 Rp 11,232.00
-Ongkos Pasang dan Material Bantu ls 1.0000 Rp 177,600.00 Rp 177,600.00
Jumlah harga persatuan pekerjaan Rp 1,158,600.00
Biaya umum dan Keuntungan 10% Rp 115,860.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,274,460.00
2 1 unit Jendela Tipe W-6E Rp 21,710,229.74
-Allumunium
1 Pemasangan alumunium kusen jendela m' 44.8580 Rp 170,501.00 Rp 7,648,333.86
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 16.3251 Rp 740,469.50 Rp 12,088,238.63

Analisa Harga Satuan Arsitektur - page 98 of 212


No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan

Jumlah harga persatuan pekerjaan Rp 19,736,572.49


Biaya umum dan Keuntungan 10% Rp 1,973,657.25
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 21,710,229.74
3 1 unit Jendela Tipe W-2E Rp 7,580,586.93
-Allumunium
1 Pemasangan alumunium kusen jendela m' 16.7860 Rp 170,501.00 Rp 2,862,029.79
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 5.4417 Rp 740,469.50 Rp 4,029,412.88

Jumlah harga persatuan pekerjaan Rp 6,891,442.66


Biaya umum dan Keuntungan 10% Rp 689,144.27
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 7,580,586.93
4 1 unit Jendela Tipe W-2AE Rp 7,280,901.47
-Allumunium
1 Pemasangan alumunium kusen jendela m' 16.3620 Rp 170,501.00 Rp 2,789,737.36
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 5.1714 Rp 740,469.50 Rp 3,829,263.97

Jumlah harga persatuan pekerjaan Rp 6,619,001.33


Biaya umum dan Keuntungan 10% Rp 661,900.13
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 7,280,901.47
5 1 unit Jendela Tipe W-6AE Rp 13,693,103.88
-Allumunium
1 Pemasangan alumunium kusen jendela m' 27.5020 Rp 170,501.00 Rp 4,689,118.50
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 10.4787 Rp 740,469.50 Rp 7,759,157.75

Jumlah harga persatuan pekerjaan Rp 12,448,276.25


Biaya umum dan Keuntungan 10% Rp 1,244,827.63
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 13,693,103.88
6 1 unit Jendela Tipe CW-6E Rp 28,851,227.58
-Allumunium
1 Pemasangan alumunium kusen jendela m' 57.9100 Rp 170,501.00 Rp 9,873,712.91
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 22.0869 Rp 740,469.50 Rp 16,354,675.80

Jumlah harga persatuan pekerjaan Rp 26,228,388.71


Biaya umum dan Keuntungan 10% Rp 2,622,838.87
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 28,851,227.58
7 1 unit Jendela Tipe FR-2 Rp 17,975,471.57
-Allumunium
1 Alumunium profil U penjepit kaca m' 13.0500 Rp 35,000.00 Rp 456,750.00
'- Kaca
1 Pemasangan Kaca tempered 12 mm m² 10.4738 Rp 933,979.50 Rp 9,782,267.79
-Aksesories & Hardware
1 Pull Handle set 2.0000 Rp 593,600.00 Rp 1,187,200.00
2 Floor Hinge set 2.0000 Rp 1,134,560.00 Rp 2,269,120.00
3 Top patch set 2.0000 Rp 204,680.00 Rp 409,360.00
4 Bottom Patch fitting kaca (ex. PT 10) set 2.0000 Rp 1,069,600.00 Rp 2,139,200.00
5 Kunci pintu kaca US 10 set 1.0000 Rp 97,440.00 Rp 97,440.00

Jumlah harga persatuan pekerjaan Rp 16,341,337.79


Biaya umum dan Keuntungan 10% Rp 1,634,133.78
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 17,975,471.57
8 1 unit Jendela Tipe FR-4 Rp 16,419,869.98
-Allumunium
1 Alumunium profil U penjepit kaca m' 28.3320 Rp 35,000.00 Rp 991,620.00
-Kaca
1 Pemasangan Kaca tempered 12 mm m² 14.9206 Rp 933,979.50 Rp 13,935,534.53

Jumlah harga persatuan pekerjaan Rp 14,927,154.53


Biaya umum dan Keuntungan 10% Rp 1,492,715.45
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 16,419,869.98
9 1 unit Jendela Tipe W-5E Rp 18,177,819.04
-Allumunium
1 Pemasangan alumunium kusen jendela m' 37.8400 Rp 170,501.00 Rp 6,451,757.84
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 13.6043 Rp 740,469.50 Rp 10,073,532.20

Jumlah harga persatuan pekerjaan Rp 16,525,290.04


Biaya umum dan Keuntungan 10% Rp 1,652,529.00
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 18,177,819.04
10 1 unit Jendela Tipe CW-1E Rp 8,810,623.76
-Allumunium
1 Pemasangan alumunium kusen jendela m' 19.8690 Rp 170,501.00 Rp 3,387,684.37
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 6.2420 Rp 740,469.50 Rp 4,621,973.60

Jumlah harga persatuan pekerjaan Rp 8,009,657.96


Biaya umum dan Keuntungan 10% Rp 800,965.80

Analisa Harga Satuan Arsitektur - page 99 of 212


No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 8,810,623.76
11 1 unit Jendela Tipe BV-3I Rp 1,912,095.15
-Allumunium
1 Pemasangan alumunium kusen jendela m' 7.4000 Rp 170,501.00 Rp 1,261,707.40
-Kaca
1 Pemasangan Kaca clear 6 mm m² 1.3800 Rp 345,334.00 Rp 476,560.92

Jumlah harga persatuan pekerjaan Rp 1,738,268.32


Biaya umum dan Keuntungan 10% Rp 173,826.83
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,912,095.15
12 1 unit Jendela Tipe BV-4I Rp 4,191,047.81
-Allumunium
1 Pemasangan alumunium kusen jendela m' 9.1000 Rp 170,501.00 Rp 1,551,559.10
-Kaca
1 Pemasangan Kaca clear 6 mm m² 6.5400 Rp 345,334.00 Rp 2,258,484.36

Jumlah harga persatuan pekerjaan Rp 3,810,043.46


Biaya umum dan Keuntungan 10% Rp 381,004.35
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 4,191,047.81
GEDUNG D1 (GIZI)
1 1 unit Jendela Tipe D-W 5 Rp 11,666,877.93
-Allumunium
1 Pemasangan alumunium kusen jendela m' 25.6500 Rp 170,501.00 Rp 4,373,350.65
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 8.4175 Rp 740,469.50 Rp 6,232,902.02

Jumlah harga persatuan pekerjaan Rp 10,606,252.67


Biaya umum dan Keuntungan 10% Rp 1,060,625.27
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 11,666,877.93
2 1 unit Jendela Tipe D-BV 5 Rp 4,718,059.54
-Allumunium
1 Pemasangan alumunium kusen jendela m' 13.3000 Rp 170,501.00 Rp 2,267,663.30
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 2.7300 Rp 740,469.50 Rp 2,021,481.74

Jumlah harga persatuan pekerjaan Rp 4,289,145.04


Biaya umum dan Keuntungan 10% Rp 428,914.50
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 4,718,059.54
3 1 unit Jendela Tipe D-BV 3 Rp 2,683,809.44
-Allumunium
1 Pemasangan alumunium kusen jendela m' 7.7980 Rp 170,501.00 Rp 1,329,566.80
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 1.4994 Rp 740,469.50 Rp 1,110,259.97

Jumlah harga persatuan pekerjaan Rp 2,439,826.77


Biaya umum dan Keuntungan 10% Rp 243,982.68
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 2,683,809.44
4 1 unit Jendela Tipe D-W 2 Rp 4,643,471.45
-Allumunium
1 Pemasangan alumunium kusen jendela m' 11.1000 Rp 170,501.00 Rp 1,892,561.10
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 3.1450 Rp 740,469.50 Rp 2,328,776.58

Jumlah harga persatuan pekerjaan Rp 4,221,337.68


Biaya umum dan Keuntungan 10% Rp 422,133.77
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 4,643,471.45
5 1 unit Jendela Tipe D-W 2A Rp 4,850,422.32
-Allumunium
1 Pemasangan alumunium kusen jendela m' 11.4000 Rp 170,501.00 Rp 1,943,711.40
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 3.3300 Rp 740,469.50 Rp 2,465,763.44

Jumlah harga persatuan pekerjaan Rp 4,409,474.84


Biaya umum dan Keuntungan 10% Rp 440,947.48
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 4,850,422.32
6 1 unit Jendela Tipe D-BV 2 Rp 1,516,813.00
-Allumunium
1 Pemasangan alumunium kusen jendela m' 4.7000 Rp 170,501.00 Rp 801,354.70
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 0.7800 Rp 740,469.50 Rp 577,566.21

Jumlah harga persatuan pekerjaan Rp 1,378,920.91


Biaya umum dan Keuntungan 10% Rp 137,892.09
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,516,813.00
7 1 unit Jendela Tipe D-BV 2A Rp 1,948,719.04
-Allumunium
1 Pemasangan alumunium kusen jendela m' 5.7000 Rp 170,501.00 Rp 971,855.70
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 1.0800 Rp 740,469.50 Rp 799,707.06

Jumlah harga persatuan pekerjaan Rp 1,771,562.76

Analisa Harga Satuan Arsitektur - page 100 of 212


No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan
Biaya umum dan Keuntungan 10% Rp 177,156.28
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,948,719.04
8 1 unit Jendela Tipe D-BV 2B Rp 3,428,448.38
-Allumunium
1 Pemasangan alumunium kusen jendela m' 11.2500 Rp 170,501.00 Rp 1,918,136.25
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 1.6188 Rp 740,469.50 Rp 1,198,635.00

Jumlah harga persatuan pekerjaan Rp 3,116,771.25


Biaya umum dan Keuntungan 10% Rp 311,677.13
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 3,428,448.38
9 1 unit Jendela Tipe D-WI 2 Rp 3,033,624.07
-Allumunium
1 Pemasangan alumunium kusen jendela m' 10.3500 Rp 170,501.00 Rp 1,764,685.35
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 1.3413 Rp 740,469.50 Rp 993,154.72

Jumlah harga persatuan pekerjaan Rp 2,757,840.07


Biaya umum dan Keuntungan 10% Rp 275,784.01
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 3,033,624.07
GEDUNG D2 (LAUNDRY)
1 1 unit Jendela Tipe D-W 5 Rp 11,666,877.93
-Allumunium
1 Pemasangan alumunium kusen jendela m' 25.6500 Rp 170,501.00 Rp 4,373,350.65
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 8.4175 Rp 740,469.50 Rp 6,232,902.02

Jumlah harga persatuan pekerjaan Rp 10,606,252.67


Biaya umum dan Keuntungan 10% Rp 1,060,625.27
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 11,666,877.93
2 1 unit Jendela Tipe D-W 3 Rp 6,672,111.12
-Allumunium
1 Pemasangan alumunium kusen jendela m' 15.4970 Rp 170,501.00 Rp 2,642,254.00
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 4.6232 Rp 740,469.50 Rp 3,423,301.57

Jumlah harga persatuan pekerjaan Rp 6,065,555.57


Biaya umum dan Keuntungan 10% Rp 606,555.56
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 6,672,111.12
3 1 unit Jendela Tipe D-W 2 Rp 4,643,471.45
-Allumunium
1 Pemasangan alumunium kusen jendela m' 11.1000 Rp 170,501.00 Rp 1,892,561.10
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 3.1450 Rp 740,469.50 Rp 2,328,776.58

Jumlah harga persatuan pekerjaan Rp 4,221,337.68


Biaya umum dan Keuntungan 10% Rp 422,133.77
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 4,643,471.45
4 1 unit Jendela Tipe D-W 2A Rp 4,850,422.32
-Allumunium
1 Pemasangan alumunium kusen jendela m' 11.4000 Rp 170,501.00 Rp 1,943,711.40
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 3.3300 Rp 740,469.50 Rp 2,465,763.44

Jumlah harga persatuan pekerjaan Rp 4,409,474.84


Biaya umum dan Keuntungan 10% Rp 440,947.48
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 4,850,422.32
5 1 unit Jendela Tipe D-W 2B Rp 4,746,946.88
-Allumunium
1 Pemasangan alumunium kusen jendela m' 11.2500 Rp 170,501.00 Rp 1,918,136.25
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 3.2375 Rp 740,469.50 Rp 2,397,270.01

Jumlah harga persatuan pekerjaan Rp 4,315,406.26


Biaya umum dan Keuntungan 10% Rp 431,540.63
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 4,746,946.88
6 1 unit Jendela Tipe D-W 2C Rp 3,815,667.95
-Allumunium
1 Pemasangan alumunium kusen jendela m' 9.9000 Rp 170,501.00 Rp 1,687,959.90
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 2.4050 Rp 740,469.50 Rp 1,780,829.15

Jumlah harga persatuan pekerjaan Rp 3,468,789.05


Biaya umum dan Keuntungan 10% Rp 346,878.90
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 3,815,667.95
7 1 unit Jendela Tipe D-BV 2 Rp 1,516,813.00
-Allumunium
1 Pemasangan alumunium kusen jendela m' 4.7000 Rp 170,501.00 Rp 801,354.70
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 0.7800 Rp 740,469.50 Rp 577,566.21

Analisa Harga Satuan Arsitektur - page 101 of 212


No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan
Jumlah harga persatuan pekerjaan Rp 1,378,920.91
Biaya umum dan Keuntungan 10% Rp 137,892.09
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,516,813.00
8 1 unit Jendela Tipe D-WI 2 Rp 4,126,094.26
-Allumunium
1 Pemasangan alumunium kusen jendela m' 10.3500 Rp 170,501.00 Rp 1,764,685.35
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 2.6825 Rp 740,469.50 Rp 1,986,309.43

Jumlah harga persatuan pekerjaan Rp 3,750,994.78


Biaya umum dan Keuntungan 10% Rp 375,099.48
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 4,126,094.26
9 1 unit Jendela Tipe D-WI 4 Rp 7,562,521.00
-Allumunium
1 Pemasangan alumunium kusen jendela m' 18.2440 Rp 170,501.00 Rp 3,110,620.24
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 5.0838 Rp 740,469.50 Rp 3,764,398.84

Jumlah harga persatuan pekerjaan Rp 6,875,019.09


Biaya umum dan Keuntungan 10% Rp 687,501.91
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 7,562,521.00
GEDUNG F (MORTUARY)
1 1 unit Jendela Tipe W-5 Rp 11,666,877.93
-Allumunium
1 Pemasangan alumunium kusen jendela m' 25.6500 Rp 170,501.00 Rp 4,373,350.65
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 8.4175 Rp 740,469.50 Rp 6,232,902.02

Jumlah harga persatuan pekerjaan Rp 10,606,252.67


Biaya umum dan Keuntungan 10% Rp 1,060,625.27
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 11,666,877.93
2 1 unit Jendela Tipe W-3 Rp 6,672,111.12
-Allumunium
1 Pemasangan alumunium kusen jendela m' 15.4970 Rp 170,501.00 Rp 2,642,254.00
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 4.6232 Rp 740,469.50 Rp 3,423,301.57

Jumlah harga persatuan pekerjaan Rp 6,065,555.57


Biaya umum dan Keuntungan 10% Rp 606,555.56
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 6,672,111.12
3 1 unit Jendela Tipe W-2 Rp 5,264,324.07
-Allumunium
1 Pemasangan alumunium kusen jendela m' 12.0000 Rp 170,501.00 Rp 2,046,012.00
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 3.7000 Rp 740,469.50 Rp 2,739,737.15

Jumlah harga persatuan pekerjaan Rp 4,785,749.15


Biaya umum dan Keuntungan 10% Rp 478,574.92
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 5,264,324.07
4 1 unit Jendela Tipe W-2A Rp 5,471,274.94
-Allumunium
1 Pemasangan alumunium kusen jendela m' 12.3000 Rp 170,501.00 Rp 2,097,162.30
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 3.8850 Rp 740,469.50 Rp 2,876,724.01

Jumlah harga persatuan pekerjaan Rp 4,973,886.31


Biaya umum dan Keuntungan 10% Rp 497,388.63
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 5,471,274.94
5 1 unit Jendela Tipe W-1 Rp 1,267,581.58
-Allumunium
1 Pemasangan alumunium kusen jendela m' 4.7500 Rp 170,501.00 Rp 809,879.75
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 0.4625 Rp 740,469.50 Rp 342,467.14

Jumlah harga persatuan pekerjaan Rp 1,152,346.89


Biaya umum dan Keuntungan 10% Rp 115,234.69
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,267,581.58
GEDUNG G (BINA MENTAL)
1 1 unit Jendela Tipe FR-1 Rp 22,757,142.99
-Allumunium
1 Alumunium profil U penjepit kaca m' 20.7000 Rp 35,000.00 Rp 724,500.00
-Kaca
1 Pemasangan Kaca tempered 12 mm m² 21.3750 Rp 933,979.50 Rp 19,963,811.81

Jumlah harga persatuan pekerjaan Rp 20,688,311.81


Biaya umum dan Keuntungan 10% Rp 2,068,831.18
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 22,757,142.99
2 1 unit Jendela Tipe FR-2 Rp 7,356,386.11
-Allumunium
1 Alumunium profil U penjepit kaca m' 10.4500 Rp 35,000.00 Rp 365,750.00
-Kaca

Analisa Harga Satuan Arsitektur - page 102 of 212


No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan
1 Pemasangan Kaca tempered 12 mm m² 6.7688 Rp 933,979.50 Rp 6,321,873.74

Jumlah harga persatuan pekerjaan Rp 6,687,623.74


Biaya umum dan Keuntungan 10% Rp 668,762.37
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 7,356,386.11
3 1 unit Jendela Tipe FR-3 Rp 7,206,134.83
-Allumunium
1 Alumunium profil U penjepit kaca m' 10.3500 Rp 35,000.00 Rp 362,250.00
-Kaca
1 Pemasangan Kaca tempered 12 mm m² 6.6263 Rp 933,979.50 Rp 6,188,781.66

Jumlah harga persatuan pekerjaan Rp 6,551,031.66


Biaya umum dan Keuntungan 10% Rp 655,103.17
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 7,206,134.83
4 1 unit Jendela Tipe FRI-1 Rp 48,939,455.00
-Allumunium
1 Alumunium profil U penjepit kaca m' 28.1000 Rp 35,000.00 Rp 983,500.00
-Kaca
1 Pemasangan Kaca tempered 12 mm m² 31.9200 Rp 933,979.50 Rp 29,812,625.64
-Aksesories & Hardware
1 Pull Handle set 4.0000 Rp 593,600.00 Rp 2,374,400.00
2 Floor Hinge set 4.0000 Rp 1,134,560.00 Rp 4,538,240.00
3 Top patch fitting kaca - wall (ex. PT 24 + PT 20) set 4.0000 Rp 543,312.00 Rp 2,173,248.00
4 Bottom Patch fitting kaca (ex. PT 10) set 4.0000 Rp 1,069,600.00 Rp 4,278,400.00
5 Kunci pintu kaca (cylinder + patch fitting ex. US 10) set 2.0000 Rp 165,000.00 Rp 330,000.00

Jumlah harga persatuan pekerjaan Rp 44,490,413.64


Biaya umum dan Keuntungan 10% Rp 4,449,041.36
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 48,939,455.00
5 1 unit Jendela Tipe BV-2 Rp 1,418,995.80
-Allumunium
1 Pemasangan alumunium kusen jendela m' 5.5000 Rp 170,501.00 Rp 937,755.50
-Kaca
1 Pemasangan Kaca clear 6 mm m² 1.0200 Rp 345,334.00 Rp 352,240.68

Jumlah harga persatuan pekerjaan Rp 1,289,996.18


Biaya umum dan Keuntungan 10% Rp 128,999.62
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,418,995.80
6 1 unit Jendela Tipe BV-1 Rp 646,696.96
-Allumunium
1 Pemasangan alumunium kusen jendela m' 2.6740 Rp 170,501.00 Rp 455,919.67
-Kaca
1 Pemasangan Kaca clear 6 mm m² 0.3822 Rp 345,334.00 Rp 131,986.65

Jumlah harga persatuan pekerjaan Rp 587,906.33


Biaya umum dan Keuntungan 10% Rp 58,790.63
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 646,696.96
7 1 unit Jendela Tipe BV-1E Rp 1,639,057.64
-Allumunium
1 Pemasangan alumunium kusen jendela m' 3.5600 Rp 170,501.00 Rp 606,983.56
2 Pemasangan alumunium Frame Daun Jendela Kaca m² 0.6480 Rp 544,080.00 Rp 352,563.84
-Kaca
1 Pemasangan Kaca tinted 6 mm m² 0.4540 Rp 559,174.00 Rp 253,865.00
-Aksesories & Hardware
1 Window Handle (Casement) set 1.0000 Rp 25,760.00 Rp 25,760.00
2 Friction Stay Jendela set 2.0000 Rp 125,440.00 Rp 250,880.00

Jumlah harga persatuan pekerjaan Rp 1,490,052.40


Biaya umum dan Keuntungan 10% Rp 149,005.24
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,639,057.64
GEDUNG H (ASRAMA)
1 1 unit Jendela Tipe W-3 Rp 6,312,016.60
-Allumunium
1 Pemasangan alumunium kusen jendela m' 14.9750 Rp 170,501.00 Rp 2,553,252.48
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 4.3013 Rp 740,469.50 Rp 3,184,944.44

Jumlah harga persatuan pekerjaan Rp 5,738,196.91


Biaya umum dan Keuntungan 10% Rp 573,819.69
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 6,312,016.60
2 1 unit Jendela Tipe W-2 Rp 4,333,045.14
-Allumunium
1 Pemasangan alumunium kusen jendela m' 10.6500 Rp 170,501.00 Rp 1,815,835.65
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 2.8675 Rp 740,469.50 Rp 2,123,296.29

Jumlah harga persatuan pekerjaan Rp 3,939,131.94


Biaya umum dan Keuntungan 10% Rp 393,913.19
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 4,333,045.14
3 1 unit Jendela Tipe BV-5 Rp 5,322,727.99
-Allumunium

Analisa Harga Satuan Arsitektur - page 103 of 212


No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan
1 Pemasangan alumunium kusen jendela m' 14.7000 Rp 170,501.00 Rp 2,506,364.70
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 3.1500 Rp 740,469.50 Rp 2,332,478.93

Jumlah harga persatuan pekerjaan Rp 4,838,843.63


Biaya umum dan Keuntungan 10% Rp 483,884.36
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 5,322,727.99
4 1 unit Jendela Tipe BV-2 Rp 1,732,766.02
-Allumunium
1 Pemasangan alumunium kusen jendela m' 5.2000 Rp 170,501.00 Rp 886,605.20
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 0.9300 Rp 740,469.50 Rp 688,636.64

Jumlah harga persatuan pekerjaan Rp 1,575,241.84


Biaya umum dan Keuntungan 10% Rp 157,524.18
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,732,766.02
5 1 unit Jendela Tipe BV-1 Rp 932,025.89
-Allumunium
1 Pemasangan alumunium kusen jendela m' 2.9500 Rp 170,501.00 Rp 502,977.95
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 0.4650 Rp 740,469.50 Rp 344,318.32

Jumlah harga persatuan pekerjaan Rp 847,296.27


Biaya umum dan Keuntungan 10% Rp 84,729.63
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 932,025.89
GEDUNG J1 (RUMAH DINAS TYPE 70)
1 1 unit Jendela Tipe W-3 Rp 5,174,778.39
-Allumunium
1 Pemasangan alumunium kusen jendela m' 9.5000 Rp 170,501.00 Rp 1,619,759.50
2 Pemasangan alumunium Frame Daun Jendela Kaca m² 2.5350 Rp 544,080.00 Rp 1,379,242.80
-Kaca
1 Pemasangan Kaca clear 6 mm m² 2.5350 Rp 345,334.00 Rp 875,421.69
-Aksesories & Hardware
1 Window Handle (Casement) set 3.0000 Rp 25,760.00 Rp 77,280.00
2 Friction Stay Jendela set 6.0000 Rp 125,440.00 Rp 752,640.00

Jumlah harga persatuan pekerjaan Rp 4,704,343.99


Biaya umum dan Keuntungan 10% Rp 470,434.40
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 5,174,778.39
2 1 unit Jendela Tipe W-2 Rp 3,537,376.11
-Allumunium
1 Pemasangan alumunium kusen jendela m' 6.8000 Rp 170,501.00 Rp 1,159,406.80
2 Pemasangan alumunium Frame Daun Jendela Kaca m² 1.6900 Rp 544,080.00 Rp 919,495.20
-Kaca
1 Pemasangan Kaca clear 6 mm m² 1.6900 Rp 345,334.00 Rp 583,614.46
-Aksesories & Hardware
1 Window Handle (Casement) set 2.0000 Rp 25,760.00 Rp 51,520.00
2 Friction Stay Jendela set 4.0000 Rp 125,440.00 Rp 501,760.00

Jumlah harga persatuan pekerjaan Rp 3,215,796.46


Biaya umum dan Keuntungan 10% Rp 321,579.65
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 3,537,376.11
3 1 unit Jendela Tipe W-1 Rp 1,899,973.82
-Allumunium
1 Pemasangan alumunium kusen jendela m' 4.1000 Rp 170,501.00 Rp 699,054.10
2 Pemasangan alumunium Frame Daun Jendela Kaca m² 0.8450 Rp 544,080.00 Rp 459,747.60
-Kaca
1 Pemasangan Kaca clear 6 mm m² 0.8450 Rp 345,334.00 Rp 291,807.23
-Aksesories & Hardware
1 Window Handle (Casement) set 1.0000 Rp 25,760.00 Rp 25,760.00
2 Friction Stay Jendela set 2.0000 Rp 125,440.00 Rp 250,880.00

Jumlah harga persatuan pekerjaan Rp 1,727,248.93


Biaya umum dan Keuntungan 10% Rp 172,724.89
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,899,973.82
GEDUNG J2 (RUMAH DINAS TYPE 50)
1 1 unit Jendela Tipe W-2 Rp 3,537,376.11
-Allumunium
1 Pemasangan alumunium kusen jendela m' 6.8000 Rp 170,501.00 Rp 1,159,406.80
2 Pemasangan alumunium Frame Daun Jendela Kaca m² 1.6900 Rp 544,080.00 Rp 919,495.20
-Kaca
1 Pemasangan Kaca clear 6 mm m² 1.6900 Rp 345,334.00 Rp 583,614.46
-Aksesories & Hardware
1 Window Handle (Casement) set 2.0000 Rp 25,760.00 Rp 51,520.00
2 Friction Stay Jendela set 4.0000 Rp 125,440.00 Rp 501,760.00

Jumlah harga persatuan pekerjaan Rp 3,215,796.46


Biaya umum dan Keuntungan 10% Rp 321,579.65
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 3,537,376.11
GEDUNG K2 (RUMAH POMPA)
1 1 unit Jendela Tipe W-2EB Rp 4,551,631.84

Analisa Harga Satuan Arsitektur - page 104 of 212


No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan
-Allumunium
1 Pemasangan alumunium kusen jendela m' 9.7500 Rp 170,501.00 Rp 1,662,384.75
2 Pemasangan alumunium Frame Daun Jendela Kaca m² 1.1563 Rp 544,080.00 Rp 629,092.50
-Kaca
1 Pemasangan Kaca tinted 6 mm m² 2.3125 Rp 559,174.00 Rp 1,293,089.88
-Aksesories & Hardware
1 Window Handle (Casement) set 2.0000 Rp 25,760.00 Rp 51,520.00
2 Friction Stay Jendela set 4.0000 Rp 125,440.00 Rp 501,760.00

Jumlah harga persatuan pekerjaan Rp 4,137,847.13


Biaya umum dan Keuntungan 10% Rp 413,784.71
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 4,551,631.84
2 1 unit Jendela Tipe W-2EC Rp 2,776,494.05
-Allumunium
1 Pemasangan alumunium kusen jendela m' 6.6000 Rp 170,501.00 Rp 1,125,306.60
2 Pemasangan alumunium Frame Daun Jendela Kaca m² 0.6750 Rp 544,080.00 Rp 367,254.00
-Kaca
1 Pemasangan Kaca tinted 6 mm m² 1.3500 Rp 559,174.00 Rp 754,884.90
-Aksesories & Hardware
1 Window Handle (Casement) set 1.0000 Rp 25,760.00 Rp 25,760.00
2 Friction Stay Jendela set 2.0000 Rp 125,440.00 Rp 250,880.00

Jumlah harga persatuan pekerjaan Rp 2,524,085.50


Biaya umum dan Keuntungan 10% Rp 252,408.55
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 2,776,494.05
3 1 unit Jendela Tipe BV-5E Rp 6,594,651.49
-Allumunium
1 Pemasangan alumunium kusen jendela m' 14.4000 Rp 170,501.00 Rp 2,455,214.40
2 Pemasangan alumunium Frame Daun Jendela Kaca m² 1.8360 Rp 544,080.00 Rp 998,930.88
-Kaca
1 Pemasangan Kaca tinted 6 mm m² 3.0600 Rp 559,174.00 Rp 1,711,072.44
-Aksesories & Hardware
1 Window Handle (Casement) set 3.0000 Rp 25,760.00 Rp 77,280.00
2 Friction Stay Jendela set 6.0000 Rp 125,440.00 Rp 752,640.00

Jumlah harga persatuan pekerjaan Rp 5,995,137.72


Biaya umum dan Keuntungan 10% Rp 599,513.77
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 6,594,651.49
GEDUNG K (POWER HOUSE, IPSRS DAN GAS MEDIS)
1 1 unit Jendela Tipe W-2 Rp 2,777,473.99
-Allumunium
1 Pemasangan alumunium kusen jendela m' 6.8500 Rp 170,501.00 Rp 1,167,931.85
2 Pemasangan alumunium Frame Daun Jendela Kaca m² 0.8750 Rp 544,080.00 Rp 476,070.00
-Kaca
1 Pemasangan Kaca clear 6 mm m² 1.7500 Rp 345,334.00 Rp 604,334.50
-Aksesories & Hardware
1 Window Handle (Casement) set 1.0000 Rp 25,760.00 Rp 25,760.00
2 Friction Stay Jendela set 2.0000 Rp 125,440.00 Rp 250,880.00

Jumlah harga persatuan pekerjaan Rp 2,524,976.35


Biaya umum dan Keuntungan 10% Rp 252,497.64
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 2,777,473.99
2 1 unit Jendela Tipe W-3 Rp 3,625,623.49
-Allumunium
1 Pemasangan alumunium kusen jendela m' 9.6000 Rp 170,501.00 Rp 1,636,809.60
2 Pemasangan alumunium Frame Daun Jendela Kaca m² 0.8750 Rp 544,080.00 Rp 476,070.00
-Kaca
1 Pemasangan Kaca clear 6 mm m² 2.6250 Rp 345,334.00 Rp 906,501.75
-Aksesories & Hardware
1 Window Handle (Casement) set 1.0000 Rp 25,760.00 Rp 25,760.00
2 Friction Stay Jendela set 2.0000 Rp 125,440.00 Rp 250,880.00

Jumlah harga persatuan pekerjaan Rp 3,296,021.35


Biaya umum dan Keuntungan 10% Rp 329,602.14
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 3,625,623.49
3 1 unit Jendela Tipe LV-2 Rp 1,437,364.39
-Allumunium
1 Pemasangan alumunium kusen jendela m' 4.9000 Rp 170,501.00 Rp 835,454.90
-Jendela
1 Alumunium louvre (Alexindo) m² 0.8400 Rp 561,000.00 Rp 471,240.00

Jumlah harga persatuan pekerjaan Rp 1,306,694.90


Biaya umum dan Keuntungan 10% Rp 130,669.49
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,437,364.39
4 1 unit Jendela Tipe LV-3 Rp 1,831,221.70
-Allumunium
1 Pemasangan alumunium kusen jendela m' 7.0000 Rp 170,501.00 Rp 1,193,507.00
-Jendela
1 Alumunium louvre (Alexindo) m² 0.8400 Rp 561,000.00 Rp 471,240.00

Jumlah harga persatuan pekerjaan Rp 1,664,747.00

Analisa Harga Satuan Arsitektur - page 105 of 212


No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan
Biaya umum dan Keuntungan 10% Rp 166,474.70
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,831,221.70
BANGUNAN RUMAH POMPA
1 1 unit Jendela Tipe LV-3 Rp 1,831,221.70
-Allumunium
1 Pemasangan alumunium kusen jendela m' 7.0000 Rp 170,501.00 Rp 1,193,507.00
-Jendela
1 Alumunium louvre (Alexindo) m² 0.8400 Rp 561,000.00 Rp 471,240.00

Jumlah harga persatuan pekerjaan Rp 1,664,747.00


Biaya umum dan Keuntungan 10% Rp 166,474.70
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,831,221.70
BANGUNAN POS JAGA
1 1 unit Jendela Tipe DW-1 Rp 2,046,893.36
-Allumunium
1 Pemasangan alumunium kusen jendela m' 3.9000 Rp 170,501.00 Rp 664,953.90
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 1.6150 Rp 740,469.50 Rp 1,195,858.24

Jumlah harga persatuan pekerjaan Rp 1,860,812.14


Biaya umum dan Keuntungan 10% Rp 186,081.21
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 2,046,893.36
2 1 unit Jendela Tipe W-3' Rp 4,594,830.53
-Allumunium
1 Pemasangan alumunium kusen jendela m' 11.8000 Rp 170,501.00 Rp 2,011,911.80
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 2.9241 Rp 740,469.50 Rp 2,165,206.86

Jumlah harga persatuan pekerjaan Rp 4,177,118.66


Biaya umum dan Keuntungan 10% Rp 417,711.87
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 4,594,830.53
3 1 unit Jendela Tipe W-3 Rp 4,873,395.16
-Allumunium
1 Pemasangan alumunium kusen jendela m' 11.8000 Rp 170,501.00 Rp 2,011,911.80
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 3.2661 Rp 740,469.50 Rp 2,418,447.43

Jumlah harga persatuan pekerjaan Rp 4,430,359.23


Biaya umum dan Keuntungan 10% Rp 443,035.92
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 4,873,395.16
4 1 unit Jendela Tipe BV-1 Rp 1,128,937.99
-Allumunium
1 Pemasangan alumunium kusen jendela m' 3.5000 Rp 170,501.00 Rp 596,753.50
-Kaca
1 Pemasangan Kaca tinted 8 mm m² 0.5801 Rp 740,469.50 Rp 429,553.76

Jumlah harga persatuan pekerjaan Rp 1,026,307.26


Biaya umum dan Keuntungan 10% Rp 102,630.73
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,128,937.99

BANGUNAN TEMPAT PEMBUANGAN SEMENTARA


1 1 unit Jendela Tipe LV-1 Rp 1,625,490.23
-Allumunium
1 Pemasangan alumunium kusen jendela m' 5.8000 Rp 170,501.00 Rp 988,905.80
-Ram Kawat
1 Pemasangan Ram Harmonika m² 1.2600 Rp 387,946.50 Rp 488,812.59

Jumlah harga persatuan pekerjaan Rp 1,477,718.39


Biaya umum dan Keuntungan 10% Rp 147,771.84
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,625,490.23

PAGAR DEPAN
1 1 unit Ornamen pada Puncak Pilar Rp 435,762.41
-Penutup Atap Kecil
1 Cor Beton tebal 5 cm m3 0.0160 Rp 1,276,885.50 Rp 20,430.17
2 Ram Kawat kg 0.3200 Rp 78,000.00 Rp 24,960.00
3 Bekisting m² 0.4400 Rp 502,264.00 Rp 220,996.16
-Dinding
1 Kaca Polos 6 mm m² 0.1500 Rp 288,000.00 Rp 43,200.00
2 Sticker Sanblast m² 0.1500 Rp 150,000.00 Rp 22,500.00
3 Cor Beton tebal 5 cm m3 0.0060 Rp 1,276,885.50 Rp 7,661.31
4 Bekisting m² 0.2400 Rp 235,000.00 Rp 56,400.00

Jumlah harga persatuan pekerjaan Rp 396,147.64


Biaya umum dan Keuntungan 10% Rp 39,614.76
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 435,762.41
2 1 unit Pagar Besi Hollo Rp 1,066,561.72
Bahan :
1 Besi Hollow Galvanis 20 x 40 m' 8.91 35,000.00 Rp 311,937.50
2 Besi Hollow Galvanis 20 x 20 m' 20.25 27,500.00 Rp 556,789.06
3 Baud 12 mm bh 8.00 4,500.00 Rp 36,000.00

Analisa Harga Satuan Arsitektur - page 106 of 212


No Kebutuhan Kode Satuan Indeks Harga Satuan Jumlah Harga Satuan
Tenaga Kerja :
1 Pekerja oh 0.1250 Rp 136,000.00 Rp 17,000.00
2 Tukang kayu oh 0.2500 Rp 145,000.00 Rp 36,250.00
3 Kepala tukang oh 0.0500 Rp 155,000.00 Rp 7,750.00
4 Mandor oh 0.0250 Rp 155,000.00 Rp 3,875.00

Jumlah harga persatuan pekerjaan Rp 969,601.56


Biaya umum dan Keuntungan 10% Rp 96,960.16
Total = Jumlah+(Biaya umum dan Keuntungan 10%) Rp 1,066,561.72

Analisa Harga Satuan Arsitektur - page 107 of 212


ANALISA HARGA SATUAN PEKERJAAN INTERIOR
PEKERJAAN PEMBANGUNAN RUMAH SAKIT REGIONAL
KELAS C KABUPATEN BONE - TAHAP LANJUTAN

satuan vol satuan jml dimensi/vol volume volume bahan jumlah bahan jumlah
No Item spesifikasi material/bahan/tenaga kerja Koefisien harga (Rp) satuan dibulatkan
bahan bahan /berat pekerjaan yang dibutuhkan yang dibutuhkan harga (Rp)

1 Pek. Custom Backdrop Farmasi m2 1 Rangka hollow galvanis 3x3 tebal 1mm m¹ 1.3378 98,000.00 btg 3.00 m¹ 7.46 29.94 9.98 9.98 131,104.56

2 Multiplek meranti 12mm m² 0.3468 265,000.00 lbr 2.98 m² 7.71 2.59 2.59 91,906.27
3 Multiplek albasia 6mm m² 0.3243 75,000.00 lbr 2.98 m² 7.21 2.42 2.42 24,324.36
4 HPL CT 7873 T salta cherry m² 0.1385 165,000.00 lbr 2.98 m² 3.08 1.03 1.03 22,860.18
5 HPL CT 7841 T steyr ash m² 0.1849 175,000.00 lbr 2.98 m² 4.11 1.38 1.38 32,353.76
Bahan / 6 HPL CT 0518 brushed silver m² 0.0112 605,000.00 lbr 2.98 m² 0.25 0.08 0.08 6,803.62
material 7 Edging carta 21mm m¹ 0.3887 7,500.00 btg 1.00 m¹ 2.90 2.90 2.90 2,915.55
8 Edging carta 42mm m¹ 0.3887 10,000.00 btg 1.00 m¹ 2.90 2.90 2.90 3,887.40
9 Lis stainless mirror 15mm m¹ 0.3534 50,000.00 btg 3.05 m¹ 8.04 2.64 2.64 17,668.00
10 Letter sign stainless mirror+backlight tinggi 10cm dengan dudukan pc 4.4236 150,000.00 pc 1.00 pc 33.00 33.00 33.00 663,538.87
11 Lem kg 0.2000 60,000.00 kaleng 0.60 kg 2.24 3.73 3.73 12,000.00
12 Paku/skrup kg 0.2500 7,500.00 bks 1.00 kg 1.87 1.87 1.87 1,875.00
13 Pekerja oh 1.5000 136,000.00 204,000.00
Tenaga kerja /
14 Tukang Kayu oh 1.5000 145,000.00 217,500.00
alat
15 Mandor oh 0.2500 155,000.00 38,750.00
Jumlah harga persatuan pekerjaan Jumlah harga persatuan pekerjaan 1,471,487.58
Keuntungan + overhead 10% Keuntungan + overhead 10% 147,148.76
Total (jumlah + keuntungan overhead 10%) Total (jumlah + keuntungan overhead 10%) 1,618,636.33

2 Pek. Custom Backdrop Admission 1 Rangka hollow galvanis 3x3 tebal 1mm m¹ 1.3462 98,000.00 btg 3.00 m¹ 13.26 53.55 17.85 17.85 131,923.08
2 Multiplek meranti 12mm m² 0.3470 265,000.00 lbr 2.98 m² 13.71 4.60 4.60 91,944.03
3 Multiplek albasia 6mm m² 0.3242 75,000.00 lbr 2.98 m² 12.81 4.30 4.30 24,313.67
4 HPL CT 7873 T salta cherry m² 0.1387 165,000.00 lbr 2.98 m² 5.48 1.84 1.84 22,882.57
5 HPL CT 7841 T steyr ash m² 0.1852 175,000.00 lbr 2.98 m² 7.32 2.46 2.46 32,418.23
6 HPL CT 0518 brushed silver m² 0.0114 605,000.00 lbr 2.98 m² 0.45 0.15 0.15 6,889.82
Bahan / 7 Edging carta 21mm m¹ 0.2187 7,500.00 btg 1.00 m¹ 2.90 2.90 2.90 1,640.27
material 8 Edging carta 42mm m¹ 0.2187 10,000.00 btg 1.00 m¹ 2.90 2.90 2.90 2,187.03
9 Lis stainless mirror 15mm m¹ 0.4414 50,000.00 btg 3.05 m¹ 17.85 5.85 5.85 22,068.10
10 Letter sign stainless mirror+backlight tinggi 10cm dengan dudukan pc 1.3575 150,000.00 pc 1.00 pc 18.00 18.00 18.00 203,619.91
11 Letter sign stainless mirror+backlight tinggi 15cm dengan dudukan pc 0.9804 225,000.00 pc 1.00 pc 13.00 13.00 13.00 220,588.24
12 Logo custom akrilik cm 6.4103 15,000.00 cm 1.00 cm 85.00 85.00 85.00 96,153.85
13 Lem kg 0.2000 60,000.00 kaleng 0.60 kg 3.98 6.63 6.63 12,000.00
14 Paku/skrup kg 0.2500 7,500.00 bks 1.00 kg 3.32 3.32 3.32 1,875.00
15 Pekerja oh 1.5000 136,000.00 204,000.00
Tenaga kerja /
16 Tukang Kayu oh 1.5000 145,000.00 217,500.00
alat
17 Mandor oh 0.2500 155,000.00 38,750.00
Jumlah harga persatuan pekerjaan Jumlah harga persatuan pekerjaan 1,330,753.79
Keuntungan + overhead 10% Keuntungan + overhead 10% 133,075.38
Total (jumlah + keuntungan overhead 10%) Total (jumlah + keuntungan overhead 10%) 1,463,829.17

3 Pek. Custom Cladding Dinding Lobby (3 unit) 1 Rangka hollow galvanis 3x3 tebal 1mm m¹ 1.4763 98,000.00 btg 3.00 m¹ 8.58 38.00 12.67 12.67 144,677.54
2 Multiplek meranti 12mm m² 0.3453 265,000.00 lbr 2.98 m² 8.83 2.96 2.96 91,517.26
3 Multiplek albasia 6mm m² 0.3258 75,000.00 lbr 2.98 m² 8.33 2.80 2.80 24,434.46
4 HPL CT 0298 F clear white m² 0.0407 130,000.00 lbr 2.98 m² 1.04 0.35 0.35 5,287.78
5 HPL CT 5571 T seaside oak m² 0.2847 168,500.00 lbr 2.98 m² 7.28 2.44 2.44 47,976.41
6 HPL CT 0518 brushed silver m² 0.0098 605,000.00 lbr 2.98 m² 0.25 0.08 0.08 5,915.51
Bahan /
7 Edging carta 21mm m¹ 0.7692 7,500.00 btg 1.00 m¹ 6.60 6.60 6.60 5,769.23
material
8 Edging carta 42mm m¹ 0.7692 10,000.00 btg 1.00 m¹ 6.60 6.60 6.60 7,692.31
9 CnC cutting m² 0.8485 200,000.00 m² 1.00 m² 7.28 7.28 7.28 169,696.97
10 Dempul kg 0.1166 45,000.00 kaleng 0.70 kg 0.70 1.00 1.00 5,244.76
11 Cat kayu ml 0.1166 75,000.00 kaleng 200.00 ml 200.00 1.00 1.00 8,741.26
12 Lem kg 0.2000 60,000.00 kaleng 0.60 kg 2.57 4.29 4.29 12,000.00
13 Paku/skrup kg 0.2500 7,500.00 bks 1.00 kg 2.15 2.15 2.15 1,875.00
14 Pekerja oh 1.5000 136,000.00 204,000.00
Tenaga kerja /
15 Tukang Kayu oh 1.5000 145,000.00 217,500.00
alat
16 Mandor oh 0.2500 155,000.00 38,750.00
Jumlah harga persatuan pekerjaan Jumlah harga persatuan pekerjaan 991,078.48
Keuntungan + overhead 10% Keuntungan + overhead 10% 99,107.85
Total (jumlah + keuntungan overhead 10%) Total (jumlah + keuntungan overhead 10%) 1,090,186.33

4 Pek. Custom Cladding Kolom Lobby (2 unit) 1 Rangka hollow galvanis 3x3 tebal 1mm m¹ 1.2452 98,000.00 btg 3.00 m¹ 6.96 26.00 8.67 8.67 122,030.65
2 Multiplek meranti 12mm m² 0.3471 265,000.00 lbr 2.98 m² 7.20 2.42 2.42 91,992.59
3 Multiplek albasia 6mm m² 0.3240 75,000.00 lbr 2.98 m² 6.72 2.26 2.26 24,299.93
Bahan /
4 HPL CT 5571 T seaside oak m² 0.2613 168,500.00 lbr 2.98 m² 5.42 1.82 1.82 44,032.53
material
5 HPL CT 0273 T golden yellow m² 0.0617 135,000.00 lbr 2.98 m² 1.28 0.43 0.43 8,331.40
6 HPL CT 0518 brushed silver m² 0.0116 605,000.00 lbr 2.98 m² 0.24 0.08 0.08 7,000.69
7 Lis stainless mirror 15mm m¹ 0.4522 50,000.00 btg 3.05 m¹ 9.60 3.15 3.15 22,611.64
8 Lem kg 0.2000 60,000.00 kaleng 0.60 kg 2.09 3.48 3.48 12,000.00
9 Paku/skrup kg 0.2500 7,500.00 bks 1.00 kg 1.74 1.74 1.74 1,875.00
10 Pekerja oh 1.5000 136,000.00 204,000.00
Tenaga kerja /
11 Tukang Kayu oh 1.5000 145,000.00 217,500.00
alat
12 Mandor oh 0.2500 155,000.00 38,750.00
Jumlah harga persatuan pekerjaan Jumlah harga persatuan pekerjaan 794,424.46
Keuntungan + overhead 10% Keuntungan + overhead 10% 79,442.45
Total (jumlah + keuntungan overhead 10%) Total (jumlah + keuntungan overhead 10%) 873,866.90

5 Pek. Custom Kabinet TV 1 Multiplek meranti 18mm m² 2.7594 320,000.00 lbr 2.98 m² 2.60 21.38 7.17 7.17 883,014.97
2 Multiplek meranti 9mm m² 0.6595 127,500.00 lbr 2.98 m² 5.11 1.71 1.71 84,089.44
3 Melaminto 12mm 1 muka m² 0.0903 265,000.00 lbr 2.98 m² 0.70 0.23 0.23 23,941.66
4 Melaminto 9mm 1 muka m² 0.2039 127,500.00 lbr 2.98 m² 1.58 0.53 0.53 26,000.26
Bahan /
material
Analisa Harga Satuan - page 108 of 207
satuan vol satuan jml dimensi/vol volume volume bahan jumlah bahan jumlah
No Item spesifikasi material/bahan/tenaga kerja Koefisien harga (Rp) satuan dibulatkan
bahan bahan /berat pekerjaan yang dibutuhkan yang dibutuhkan harga (Rp)
Bahan / 5 HPL CT 5173 T white oak m² 3.2602 168,500.00 lbr 2.98 m² 25.26 8.48 8.48 549,343.06
material 6 HPL CT 0136 T graphite m² 0.4298 150,000.00 lbr 2.98 m² 3.33 1.12 1.12 64,468.25
7 Engsel full bengkok soft close Hafele set 1.1538 80,000.00 set 2.00 pcs 6.00 3.00 3.00 92,307.69
8 Engsel stgh bengkok soft close Hafele set 0.3846 50,000.00 set 2.00 pcs 2.00 1.00 1.00 19,230.77
9 Lem kg 0.2000 60,000.00 kaleng 0.60 kg 0.78 1.30 1.30 12,000.00
10 Paku/skrup kg 0.2500 7,500.00 bks 1.00 kg 0.65 0.65 0.65 1,875.00
11 Pekerja oh 1.5000 136,000.00 204,000.00
Tenaga kerja /
12 Tukang Kayu oh 1.5000 145,000.00 217,500.00
alat
13 Mandor oh 0.2500 155,000.00 38,750.00
Jumlah harga persatuan pekerjaan Jumlah harga persatuan pekerjaan 2,216,521.10
Keuntungan + overhead 10% Keuntungan + overhead 10% 221,652.11
Total (jumlah + keuntungan overhead 10%) Total (jumlah + keuntungan overhead 10%) 2,438,173.21

6 Pek. Custom Cladding Kolom (2 unit) 1 Rangka hollow galvanis 3x3 tebal 1mm m¹ 1.9052 98,000.00 btg 3.00 m¹ 2.32 13.26 4.42 4.42 186,706.90
2 Multiplek meranti 12mm m² 0.3356 265,000.00 lbr 2.98 m² 2.32 0.78 0.78 88,926.17
3 Multiplek albasia 6mm m² 0.3356 75,000.00 lbr 2.98 m² 2.32 0.78 0.78 25,167.79
Bahan /
4 HPL CT 5441 T cream pine m² 0.3356 178,000.00 lbr 2.98 m² 2.32 0.78 0.78 59,731.54
material
5 Lis stainless mirror 15mm m¹ 0.4522 50,000.00 btg 3.05 m¹ 3.20 1.05 1.05 22,611.64
6 Lem kg 0.2000 60,000.00 kaleng 0.60 kg 0.70 1.16 1.16 12,000.00
7 Paku/skrup kg 0.2500 7,500.00 bks 1.00 kg 0.58 0.58 0.58 1,875.00
8 Pekerja oh 1.5000 136,000.00 204,000.00
Tenaga kerja /
9 Tukang Kayu oh 1.5000 145,000.00 217,500.00
alat
10 Mandor oh 0.2500 155,000.00 38,750.00
Jumlah harga persatuan pekerjaan Jumlah harga persatuan pekerjaan 474,125.00
Keuntungan + overhead 10% Keuntungan + overhead 10% 47,412.50
Total (jumlah + keuntungan overhead 10%) Total (jumlah + keuntungan overhead 10%) 521,537.50

7 Pek. Custom Backdrop TV 1 Multiplek meranti 18mm m² 0.4826 320,000.00 lbr 2.98 m² 17.98 25.86 8.68 8.68 154,444.54
2 Multiplek meranti 12mm m² 0.2279 265,000.00 lbr 2.98 m² 12.21 4.10 4.10 60,388.69
3 Multiplek meranti 9mm m² 0.0668 127,500.00 lbr 2.98 m² 3.58 1.20 1.20 8,518.97
4 Multiplek albasia 6mm m² 0.2133 75,000.00 lbr 2.98 m² 11.43 3.84 3.84 15,999.32
5 HPL CT 7873 T salta cherry m² 0.2370 165,000.00 lbr 2.98 m² 12.70 4.26 4.26 39,109.45
6 HPL CT 0298 F clear white m² 0.0579 130,000.00 lbr 2.98 m² 3.10 1.04 1.04 7,521.41
Bahan /
7 HPL CT 5923 T cocoa ash m² 0.1659 180,000.00 lbr 2.98 m² 8.89 2.98 2.98 29,865.40
material
8 Lis stainless mirror 15mm m¹ 0.2392 50,000.00 btg 3.05 m¹ 13.12 4.30 4.30 11,962.29
9 Kaca clear 5mm m² 0.0164 125,000.00 lbr 2.98 m² 0.88 0.30 0.30 2,052.99
10 Dudukan ambalan kaca nuho pc 0.8899 5,000.00 pc 1.00 pc 16.00 16.00 16.00 4,449.39
11 Engsel lurus soft close Hafele set 0.1112 30,000.00 set 2.00 pcs 4.00 2.00 2.00 3,337.04
12 Lem kg 0.2000 60,000.00 kaleng 0.60 kg 5.39 8.99 8.99 12,000.00
13 Paku/skrup kg 0.2500 7,500.00 bks 1.00 kg 4.50 4.50 4.50 1,875.00
14 Pekerja oh 1.5000 136,000.00 204,000.00
Tenaga kerja /
15 Tukang Kayu oh 1.5000 145,000.00 217,500.00
alat
16 Mandor oh 0.2500 155,000.00 38,750.00
Jumlah harga persatuan pekerjaan Jumlah harga persatuan pekerjaan 811,774.48
Keuntungan + overhead 10% Keuntungan + overhead 10% 81,177.45
Total (jumlah + keuntungan overhead 10%) Total (jumlah + keuntungan overhead 10%) 892,951.93

8 Pek. Custom Cladding Dinding Kiri 1 Rangka hollow galvanis 3x3 tebal 1mm m¹ 3.7524 98,000.00 btg 3.00 m¹ 7.54 84.88 28.29 28.29 367,738.28
2 Multiplek meranti 12mm m² 0.4330 265,000.00 lbr 2.98 m² 9.73 3.27 3.27 114,754.86
3 Multiplek albasia 6mm m² 0.4072 75,000.00 lbr 2.98 m² 9.15 3.07 3.07 30,541.81
4 HPL CT 5571 T seaside oak m² 0.3240 168,500.00 lbr 2.98 m² 7.28 2.44 2.44 54,593.84
5 HPL CT 5923 T cocoa ash m² 0.0125 180,000.00 lbr 2.98 m² 0.28 0.09 0.09 2,243.07
Bahan /
6 Rockwool 60 1200x600 m² 0.3333 91,666.67 lbr 3.00 m² 7.54 2.51 2.51 30,555.56
material
7 CnC cutting m² 0.9655 200,000.00 m² 1.00 m² 7.28 7.28 7.28 193,103.45
8 Dempul kg 0.1326 45,000.00 kaleng 0.70 kg 0.70 1.00 1.00 5,968.17
9 Cat kayu ml 0.1326 75,000.00 kaleng 200.00 ml 200.00 1.00 1.00 9,946.95
10 Lem kg 0.2000 60,000.00 kaleng 0.60 kg 2.26 3.77 3.77 12,000.00
11 Paku/skrup kg 0.2500 7,500.00 bks 1.00 kg 1.89 1.89 1.89 1,875.00
12 Pekerja oh 1.5000 136,000.00 204,000.00
Tenaga kerja /
13 Tukang Kayu oh 1.5000 145,000.00 217,500.00
alat
14 Mandor oh 0.2500 155,000.00 38,750.00
Jumlah harga persatuan pekerjaan Jumlah harga persatuan pekerjaan 1,283,571.00
Keuntungan + overhead 10% Keuntungan + overhead 10% 128,357.10
Total (jumlah + keuntungan overhead 10%) Total (jumlah + keuntungan overhead 10%) 1,411,928.09

9 Pek. Custom Insulasi Dinding Peredam + Wallpaper 1 Rangka hollow gypsum 4x4 tebal 0,9mm m² 0.7059 142,000.00 btg 4.00 m¹ 29.89 84.40 21.10 21.10 100,240.88
2 Gypsum gyproc topline 9mm m² 0.3958 75,000.00 lbr 2.88 m² 34.07 11.83 11.83 29,683.49
3 Rockwool 60 1200x600 m² 0.0183 91,666.67 lbr 3.00 m² 1.64 0.55 0.55 1,676.52
Bahan / 4 Multiplek meranti 9mm m² 0.0021 127,500.00 lbr 2.98 m² 0.19 0.06 0.06 271.97
material 5 HPL CT 5923 T cocoa ash m² 0.0391 180,000.00 lbr 2.98 m² 3.48 1.17 1.17 7,032.50
6 Wallpaper+pemasangan m² 1.1398 195,000.00 m² 1.00 m² 34.07 34.07 34.07 222,269.99
7 Lem kg 0.0167 60,000.00 kaleng 0.60 kg 0.30 0.50 0.50 1,003.68
8 Paku/skrup kg 0.3000 7,500.00 bks 1.00 kg 8.97 8.97 8.97 2,250.00
9 Pekerja oh 1.5000 136,000.00 204,000.00
Tenaga kerja /
10 Tukang Kayu oh 1.5000 145,000.00 217,500.00
alat
11 Mandor oh 0.2500 155,000.00 38,750.00
Jumlah harga persatuan pekerjaan Jumlah harga persatuan pekerjaan 824,679.03
Keuntungan + overhead 10% Keuntungan + overhead 10% 82,467.90
Total (jumlah + keuntungan overhead 10%) Total (jumlah + keuntungan overhead 10%) 907,146.93

10 Pek. Custom Cladding Kolom (2 unit) 1 Rangka hollow galvanis 3x3 tebal 1mm m¹ 1.6026 98,000.00 btg 3.00 m¹ 4.06 19.52 6.51 6.51 157,057.47
2 Multiplek meranti 12mm m² 0.3356 265,000.00 lbr 2.98 m² 4.06 1.36 1.36 88,926.17
3 Multiplek albasia 6mm m² 0.3356 75,000.00 lbr 2.98 m² 4.06 1.36 1.36 25,167.79
Bahan /
4 HPL CT 5923 T cocoa ash m² 0.3356 180,000.00 lbr 2.98 m² 4.06 1.36 1.36 60,402.68
material
5 Lis stainless mirror 15mm m¹ 0.4522 50,000.00 btg 3.05 m¹ 5.60 1.84 1.84 22,611.64
6 Lem kg 0.2000 60,000.00 kaleng 0.60 kg 1.22 2.03 2.03 12,000.00
7 Paku/skrup kg 0.2500 7,500.00 bks 1.00 kg 1.02 1.02 1.02 1,875.00

Analisa Harga Satuan - page 109 of 207


satuan vol satuan jml dimensi/vol volume volume bahan jumlah bahan jumlah
No Item spesifikasi material/bahan/tenaga kerja Koefisien harga (Rp) satuan dibulatkan
bahan bahan /berat pekerjaan yang dibutuhkan yang dibutuhkan harga (Rp)
8 Pekerja oh 1.5000 136,000.00 204,000.00
Tenaga kerja /
9 Tukang Kayu oh 1.5000 145,000.00 217,500.00
alat
10 Mandor oh 0.2500 155,000.00 38,750.00
Jumlah harga persatuan pekerjaan Jumlah harga persatuan pekerjaan 828,290.76
Keuntungan + overhead 10% Keuntungan + overhead 10% 82,829.08
Total (jumlah + keuntungan overhead 10%) Total (jumlah + keuntungan overhead 10%) 911,119.84

11 Pek. Custom Cladding Dinding A (2 unit) 1 Rangka hollow galvanis 3x3 tebal 1mm m¹ 1.3737 98,000.00 btg 3.00 m¹ 9.90 40.80 13.60 13.60 134,626.26
2 Multiplek meranti 12mm m² 0.3457 265,000.00 lbr 2.98 m² 10.20 3.42 3.42 91,620.91
3 Multiplek albasia 6mm m² 0.3254 75,000.00 lbr 2.98 m² 9.60 3.22 3.22 24,405.13
4 HPL CT 5571 T seaside oak m² 0.3254 168,500.00 lbr 2.98 m² 9.60 3.22 3.22 54,830.18
5 HPL CT 0518 brushed silver m² 0.0102 605,000.00 lbr 2.98 m² 0.30 0.10 0.10 6,152.13
6 Edging carta 21mm m¹ 0.3333 7,500.00 btg 1.00 m¹ 3.30 3.30 3.30 2,500.00
Bahan / 7 Edging carta 42mm m¹ 0.3333 10,000.00 btg 1.00 m¹ 3.30 3.30 3.30 3,333.33
material 8 Letter sign stainless mirror+backlight tinggi 10cm dengan dudukan pc 1.8182 150,000.00 pc 1.00 pc 18.00 18.00 18.00 272,727.27
9 Letter sign stainless mirror+backlight tinggi 15cm dengan dudukan pc 1.3131 225,000.00 pc 1.00 pc 13.00 13.00 13.00 295,454.55
10 Logo custom akrilik cm 8.5859 15,000.00 cm 1.00 cm 85.00 85.00 85.00 128,787.88
11 Cat kayu ml 0.1010 75,000.00 kaleng 200.00 ml 200.00 1.00 1.00 7,575.76
12 Dempul kg 0.1010 45,000.00 kaleng 0.70 kg 0.70 1.00 1.00 4,545.45
13 Lem kg 0.2000 60,000.00 kaleng 0.60 kg 2.97 4.95 4.95 12,000.00
14 Paku/skrup kg 0.2500 7,500.00 bks 1.00 kg 2.48 2.48 2.48 1,875.00
15 Pekerja oh 1.5000 136,000.00 204,000.00
Tenaga kerja /
16 Tukang Kayu oh 1.5000 145,000.00 217,500.00
alat
17 Mandor oh 0.2500 155,000.00 38,750.00
Jumlah harga persatuan pekerjaan Jumlah harga persatuan pekerjaan 1,500,683.84
Keuntungan + overhead 10% Keuntungan + overhead 10% 150,068.38
Total (jumlah + keuntungan overhead 10%) Total (jumlah + keuntungan overhead 10%) 1,650,752.23

12 Pek. Custom Cladding Dinding B 1 Rangka hollow galvanis 3x3 tebal 1mm m¹ 1.3509 98,000.00 btg 3.00 m¹ 11.96 48.47 16.16 16.16 132,387.40
2 Multiplek meranti 12mm m² 0.3457 265,000.00 lbr 2.98 m² 12.32 4.13 4.13 91,602.88
3 Multiplek albasia 6mm m² 0.3255 75,000.00 lbr 2.98 m² 11.60 3.89 3.89 24,410.23
4 HPL CT 5571 T seaside oak m² 0.3255 168,500.00 lbr 2.98 m² 11.60 3.89 3.89 54,841.64
5 HPL CT 0518 brushed silver m² 0.0101 605,000.00 lbr 2.98 m² 0.36 0.12 0.12 6,110.97
Bahan / 6 Edging carta 21mm m¹ 0.5518 7,500.00 btg 1.00 m¹ 6.60 6.60 6.60 4,138.80
material 7 Edging carta 42mm m¹ 0.5518 10,000.00 btg 1.00 m¹ 6.60 6.60 6.60 5,518.39
11 CnC cutting m² 0.9699 200,000.00 m² 1.00 m² 11.60 11.60 11.60 193,979.93
12 Cat kayu ml 0.0836 75,000.00 kaleng 200.00 ml 200.00 1.00 1.00 6,270.90
13 Dempul kg 0.0836 45,000.00 kaleng 0.70 kg 0.70 1.00 1.00 3,762.54
14 Lem kg 0.2000 60,000.00 kaleng 0.60 kg 3.59 5.98 5.98 12,000.00
15 Paku/skrup kg 0.2500 7,500.00 bks 1.00 kg 2.99 2.99 2.99 1,875.00
16 Pekerja oh 1.5000 136,000.00 204,000.00
Tenaga kerja /
17 Tukang Kayu oh 1.5000 145,000.00 217,500.00
alat
18 Mandor oh 0.2500 155,000.00 38,750.00
Jumlah harga persatuan pekerjaan Jumlah harga persatuan pekerjaan 997,148.70
Keuntungan + overhead 10% Keuntungan + overhead 10% 99,714.87
Total (jumlah + keuntungan overhead 10%) Total (jumlah + keuntungan overhead 10%) 1,096,863.57

13 Pek. Custom Backdrop Administrasi 1 Rangka hollow galvanis 3x3 tebal 1mm m¹ 1.5039 98,000.00 btg 3.00 m¹ 5.94 26.80 8.93 8.93 147,384.96
2 Multiplek meranti 12mm m² 0.3469 265,000.00 lbr 2.98 m² 6.14 2.06 2.06 91,920.32
3 Multiplek albasia 6mm m² 0.3237 75,000.00 lbr 2.98 m² 5.73 1.92 1.92 24,278.02
4 HPL CT 7873 T salta cherry m² 0.1390 165,000.00 lbr 2.98 m² 2.46 0.83 0.83 22,930.65
5 HPL CT 7841 T steyr ash m² 0.1847 175,000.00 lbr 2.98 m² 3.27 1.10 1.10 32,328.32
Bahan /
6 HPL CT 0518 brushed silver m² 0.0113 605,000.00 lbr 2.98 m² 0.20 0.07 0.07 6,835.69
material
7 Edging carta 21mm m¹ 0.9764 7,500.00 btg 1.00 m¹ 5.80 5.80 5.80 7,323.23
8 Edging carta 42mm m¹ 0.9764 10,000.00 btg 1.00 m¹ 5.80 5.80 5.80 9,764.31
9 Lis stainless mirror 15mm m¹ 0.3809 50,000.00 btg 3.05 m¹ 6.90 2.26 2.26 19,042.89
10 Lem kg 0.2000 60,000.00 kaleng 0.60 kg 1.78 2.97 2.97 12,000.00
11 Paku/skrup kg 0.2500 7,500.00 bks 1.00 kg 1.49 1.49 1.49 1,875.00
12 Pekerja oh 1.5000 136,000.00 204,000.00
Tenaga kerja /
13 Tukang Kayu oh 1.5000 145,000.00 217,500.00
alat
14 Mandor oh 0.2500 155,000.00 38,750.00
Jumlah harga persatuan pekerjaan Jumlah harga persatuan pekerjaan 835,933.39
Keuntungan + overhead 10% Keuntungan + overhead 10% 83,593.34
Total (jumlah + keuntungan overhead 10%) Total (jumlah + keuntungan overhead 10%) 919,526.73

14 Pek. Custom Lemari Pakaian VVIP 1 Multiplek meranti 18mm m² 4.2867 320,000.00 lbr 2.98 m² 1.18 15.01 5.04 5.04 1,371,754.96
2 Multiplek meranti 12mm m² 0.8796 265,000.00 lbr 2.98 m² 3.08 1.03 1.03 233,100.10
3 Multiplek meranti 9mm m² 0.8196 127,500.00 lbr 2.98 m² 2.87 0.96 0.96 104,505.21
4 HPL CT 5498 T african teak m² 5.5148 171,000.00 lbr 2.98 m² 19.31 6.48 6.48 943,027.27
5 HPL CT 5442 T sweet pine m² 1.6107 172,000.00 lbr 2.98 m² 5.64 1.89 1.89 277,046.98
Bahan / 6 Engsel lurus soft close Hafele set 3.4043 30,000.00 set 2.00 pcs 8.00 4.00 4.00 102,127.66
material 7 Gantungan baju mekanikal Hafele pc 0.8511 650,000.00 pc 1.00 pc 1.00 1.00 1.00 553,191.49
8 Rel sliding drawer soft close Hafele set 0.8511 150,000.00 set 2.00 pcs 2.00 1.00 1.00 127,659.57
9 Rel sliding drawer ball bearing 30kg Hafele set 0.8511 190,000.00 set 2.00 pcs 2.00 1.00 1.00 161,702.13
10 Handle tanam aluminium btg 1.3617 45,000.00 btg 3.00 m¹ 4.80 1.60 1.60 61,276.60
11 Lem kaleng 0.2000 60,000.00 kaleng 0.60 kg 0.59 0.98 0.98 12,000.00
12 Paku/skrup bks 0.5000 7,500.00 bks 1.00 kg 0.59 0.59 0.59 3,750.00
13 Pekerja oh 1.5000 136,000.00 204,000.00
Tenaga kerja /
14 Tukang Kayu oh 1.5000 145,000.00 217,500.00
alat
15 Mandor oh 0.2500 155,000.00 38,750.00
Jumlah harga persatuan pekerjaan Jumlah harga persatuan pekerjaan 4,411,391.97
Keuntungan + overhead 10% Keuntungan + overhead 10% 441,139.20
Total (jumlah + keuntungan overhead 10%) Total (jumlah + keuntungan overhead 10%) 4,852,531.17

15 Pek. Custom Lemari Pakaian VIP 1 Multiplek meranti 18mm m² 6.2483 320,000.00 lbr 2.98 m² 0.50 9.31 3.12 3.12 1,999,463.09
2 Multiplek meranti 12mm m² 0.3087 265,000.00 lbr 2.98 m² 0.46 0.15 0.15 81,812.08
3 Multiplek meranti 9mm m² 0.8188 127,500.00 lbr 2.98 m² 1.22 0.41 0.41 104,395.97
4 HPL CT 5498 T african teak m² 1.1275 171,000.00 lbr 2.98 m² 1.68 0.56 0.56 192,805.37
Bahan /
material
Analisa Harga Satuan - page 110 of 207
satuan vol satuan jml dimensi/vol volume volume bahan jumlah bahan jumlah
No Item spesifikasi material/bahan/tenaga kerja Koefisien harga (Rp) satuan dibulatkan
bahan bahan /berat pekerjaan yang dibutuhkan yang dibutuhkan harga (Rp)
Bahan /
5 HPL CT 5442 T sweet pine m² 6.8121 172,000.00 lbr 2.98 m² 10.15 3.41 3.41 1,171,677.85
material
6 Engsel lurus soft close Hafele pcs 4.0000 30,000.00 set 2.00 pcs 4.00 2.00 2.00 120,000.00
7 Handle tanam aluminium m¹ 0.6733 45,000.00 btg 3.00 m¹ 1.01 0.34 0.34 30,300.00
8 Lem kg 0.2000 60,000.00 kaleng 0.60 kg 0.25 0.42 0.42 12,000.00
9 Paku/skrup kg 0.5000 7,500.00 bks 1.00 kg 0.25 0.25 0.25 3,750.00
10 Pekerja oh 1.5000 136,000.00 204,000.00
Tenaga kerja /
11 Tukang Kayu oh 1.5000 145,000.00 217,500.00
alat
12 Mandor oh 0.2500 155,000.00 38,750.00
Jumlah harga persatuan pekerjaan Jumlah harga persatuan pekerjaan 4,176,454.36
Keuntungan + overhead 10% Keuntungan + overhead 10% 417,645.44
Total (jumlah + keuntungan overhead 10%) Total (jumlah + keuntungan overhead 10%) 4,594,099.80

16 Pek. Custom Kredensa VVIP 1 Multiplek meranti 18mm m² 1.0843 320,000.00 lbr 2.98 m² 1.93 6.22 2.09 2.09 346,971.15
2 Multiplek meranti 9mm m² 0.3364 127,500.00 lbr 2.98 m² 1.93 0.65 0.65 42,896.37
3 HPL CT 5442 T sweet pine m² 0.2998 172,000.00 lbr 2.98 m² 1.72 0.58 0.58 51,571.52
Bahan /
4 HPL CT 0101 T white m² 1.3824 148,000.00 lbr 2.98 m² 7.93 2.66 2.66 204,591.65
material
5 Rel sliding drawer soft close Hafele pcs 2.0779 150,000.00 set 2.00 pcs 8.00 4.00 4.00 311,688.31
6 Lem kg 0.2000 60,000.00 kaleng 0.60 kg 0.96 1.60 1.60 12,000.00
7 Paku/skrup kg 0.5000 7,500.00 bks 1.00 kg 0.96 0.96 0.96 3,750.00
10 Pekerja oh 1.5000 136,000.00 oh 204,000.00
Tenaga kerja /
11 Tukang Kayu oh 1.5000 145,000.00 oh 217,500.00
alat
12 Mandor oh 0.2500 155,000.00 oh 38,750.00
Jumlah harga persatuan pekerjaan Jumlah harga persatuan pekerjaan 1,433,718.99
Keuntungan + overhead 10% Keuntungan + overhead 10% 143,371.90
Total (jumlah + keuntungan overhead 10%) Total (jumlah + keuntungan overhead 10%) 1,577,090.89

17 Pek. Custom Kredensa VIP 1 Multiplek meranti 18mm m² 0.9030 320,000.00 lbr 2.98 m² 2.75 7.40 2.48 2.48 288,956.68
2 Multiplek meranti 9mm m² 0.2355 127,500.00 lbr 2.98 m² 1.93 0.65 0.65 30,027.46
Bahan / 3 HPL CT 0136 T graphite m² 0.4979 172,000.00 lbr 2.98 m² 4.08 1.37 1.37 85,632.70
material 4 HPL CT 0101 T white m² 0.8261 148,000.00 lbr 2.98 m² 6.77 2.27 2.27 122,264.80
5 Rel sliding drawer soft close Hafele pcs 1.4545 150,000.00 set 2.00 pcs 8.00 4.00 4.00 218,181.82
6 Lem kg 0.2000 60,000.00 kaleng 0.60 kg 1.38 2.29 2.29 12,000.00
7 Paku/skrup kg 0.5000 7,500.00 bks 1.00 kg 1.38 1.38 1.38 3,750.00
10 Pekerja oh 1.5000 136,000.00 oh 204,000.00
Tenaga kerja /
11 Tukang Kayu oh 1.5000 145,000.00 oh 217,500.00
alat
12 Mandor oh 0.2500 155,000.00 oh 38,750.00
Jumlah harga persatuan pekerjaan Jumlah harga persatuan pekerjaan 1,221,063.45
Keuntungan + overhead 10% Keuntungan + overhead 10% 122,106.35
Total (jumlah + keuntungan overhead 10%) Total (jumlah + keuntungan overhead 10%) 1,343,169.80

18 Pek. Custom Kabinet Pantry VVIP 1 Multiplek meranti 18mm m² 1.6906 320,000.00 lbr 2.98 m² 2.90 14.61 4.90 4.90 540,985.88
2 Melaminto 9mm 1 muka m² 0.1875 210,000.00 lbr 2.98 m² 1.62 0.54 0.54 39,365.89
3 HPL CT 0101 T white m² 0.6723 148,000.00 lbr 2.98 m² 5.81 1.95 1.95 99,500.12
4 HPL CT 5498 T african teak m² 0.2129 171,000.00 lbr 2.98 m² 1.84 0.62 0.62 36,408.24
5 HPL CT 5923 T cocoa ash m² 0.3552 180,000.00 lbr 2.98 m² 3.07 1.03 1.03 63,943.53
Bahan / 6 Engsel lurus soft close Hafele pcs 0.6897 30,000.00 set 2.00 pcs 4.00 2.00 2.00 20,689.66
material 7 Engsel stgh bengkok soft close Hafele pcs 0.6897 50,000.00 set 2.00 pcs 4.00 2.00 2.00 34,482.76
8 Washtafel keramik blanco naya 6 pc 0.3448 7,000,000.00 pc 1.00 pc 1.00 1.00 1.00 2,413,793.10
9 Keran air blanco mili pc 0.3448 450,000.00 pc 1.00 pc 1.00 1.00 1.00 155,172.41
10 Backpainted glass Glasstone+pemasangan m² 0.6000 1,600,000.00 m² 1.00 m² 1.74 1.74 1.74 960,000.00
11 Quadra quartz sand m² 0.0882 7,650,000.00 slab 5.12 m² 1.31 0.26 0.26 674,939.39
12 Lem kg 0.2000 60,000.00 kaleng 0.60 kg 1.45 2.42 2.42 12,000.00
13 Paku/skrup kg 0.5000 7,500.00 bks 1.00 kg 1.45 1.45 1.45 3,750.00
14 Pekerja oh 1.5000 136,000.00 oh 204,000.00
Tenaga kerja /
15 Tukang Kayu oh 1.5000 145,000.00 oh 217,500.00
alat
16 Mandor oh 0.2500 155,000.00 oh 38,750.00
Jumlah harga persatuan pekerjaan Jumlah harga persatuan pekerjaan 5,515,280.97
Keuntungan + overhead 10% Keuntungan + overhead 10% 551,528.10
Total (jumlah + keuntungan overhead 10%) Total (jumlah + keuntungan overhead 10%) 6,066,809.07

19 Pek. Custom Kabinet Pantry VIP 1 Multiplek meranti 18mm m² 1.2862 320,000.00 lbr 2.98 m² 1.68 6.42 2.15 2.15 411,579.69
2 Melaminto 9mm 1 muka m² 0.1703 210,000.00 lbr 2.98 m² 0.85 0.29 0.29 35,760.79
3 HPL CT 0101 T white m² 1.0798 148,000.00 lbr 2.98 m² 5.39 1.81 1.81 159,815.69
Bahan / 4 HPL CT 7841 T steyr ash m² 0.2564 175,000.00 lbr 2.98 m² 1.28 0.43 0.43 44,876.29
material 5 Engsel lurus soft close Hafele pcs 1.1940 30,000.00 set 2.00 pcs 4.00 2.00 2.00 35,820.90
6 Backpainted glass Glasstone+pemasangan m² 0.4179 1,600,000.00 m² 1.00 m² 0.70 0.70 0.70 668,656.72
7 Quadra ceppo grigio m² 0.0816 8,750,000.00 slab 5.12 m² 0.70 0.14 0.14 714,202.43
8 Lem kg 0.2000 60,000.00 kaleng 0.60 kg 0.84 1.40 1.40 12,000.00
9 Paku/skrup kg 0.5000 7,500.00 bks 1.00 kg 0.84 0.84 0.84 3,750.00
10 Pekerja oh 1.5000 136,000.00 oh 204,000.00
Tenaga kerja /
11 Tukang Kayu oh 1.5000 145,000.00 oh 217,500.00
alat
12 Mandor oh 0.2500 155,000.00 oh 38,750.00
Jumlah harga persatuan pekerjaan Jumlah harga persatuan pekerjaan 2,546,712.49
Keuntungan + overhead 10% Keuntungan + overhead 10% 254,671.25
Total (jumlah + keuntungan overhead 10%) Total (jumlah + keuntungan overhead 10%) 2,801,383.74

20 Pek. Custom Backdrop Bedhead Panel VVIP 1 Multiplek meranti 12mm 0.3356 265,000.00 lbr 2.98 m² 11.02 11.02 3.70 3.70 88,926.17
2 Multiplek albasia 6mm 0.3356 75,000.00 lbr 2.98 m² 11.02 3.70 3.70 25,167.79
3 HPL CT 5442 T sweet pine 0.3356 172,000.00 lbr 2.98 m² 11.02 3.70 3.70 57,718.12
Bahan / 4 Rangka hollow galvanis 3x3 tebal 1mm 3.0835 98,000.00 btg 3.00 m¹ 101.94 33.98 33.98 302,181.49
material 5 Dextone silikon sealant akrilik warna putih 0.1815 40,000.00 pc 1.00 pc 2.00 2.00 2.00 7,259.53
6 Radilum hospital plint lurus 0.3448 90,000.00 btg 1.00 m¹ 3.80 3.80 3.80 31,034.48
7 Lem 0.2000 60,000.00 kaleng 0.60 kg 3.31 5.51 5.51 12,000.00
8 Paku/skrup 0.2500 7,500.00 bks 1.00 kg 2.76 2.76 2.76 1,875.00
13 Pekerja oh 1.5000 136,000.00 oh 204,000.00
Tenaga kerja /
14 Tukang Kayu oh 1.5000 145,000.00 oh 217,500.00
alat
15 Mandor oh 0.2500 155,000.00 oh 38,750.00

Analisa Harga Satuan - page 111 of 207


satuan vol satuan jml dimensi/vol volume volume bahan jumlah bahan jumlah
No Item spesifikasi material/bahan/tenaga kerja Koefisien harga (Rp) satuan dibulatkan
bahan bahan /berat pekerjaan yang dibutuhkan yang dibutuhkan harga (Rp)
Jumlah harga persatuan pekerjaan Jumlah harga persatuan pekerjaan 986,412.58
Keuntungan + overhead 10% Keuntungan + overhead 10% 98,641.26
Total (jumlah + keuntungan overhead 10%) Total (jumlah + keuntungan overhead 10%) 1,085,053.84

21 Pek. Custom Backdrop Bedhead Panel VIP 1 Multiplek meranti 12mm 0.3356 265,000.00 lbr 2.98 m² 9.57 9.57 3.21 3.21 88,926.17
2 Multiplek albasia 6mm 0.3356 75,000.00 lbr 2.98 m² 9.57 3.21 3.21 25,167.79
3 HPL CT 5442 T sweet pine 0.3356 172,000.00 lbr 2.98 m² 9.57 3.21 3.21 57,718.12
Bahan / 4 Rangka hollow galvanis 3x3 tebal 1mm 1.3967 98,000.00 btg 3.00 m¹ 40.10 13.37 13.37 136,879.14
material 5 Dextone silikon sealant akrilik warna putih 0.2090 40,000.00 pc 1.00 pc 2.00 2.00 2.00 8,359.46
6 Radilum hospital plint lurus 0.3448 90,000.00 btg 1.00 m¹ 3.30 3.30 3.30 31,034.48
7 Lem 0.2000 60,000.00 kaleng 0.60 kg 2.87 4.79 4.79 12,000.00
8 Paku/skrup 0.2500 7,500.00 bks 1.00 kg 2.39 2.39 2.39 1,875.00
13 Pekerja oh 1.5000 136,000.00 oh 204,000.00
Tenaga kerja /
14 Tukang Kayu oh 1.5000 145,000.00 oh 217,500.00
alat
15 Mandor oh 0.2500 155,000.00 oh 38,750.00
Jumlah harga persatuan pekerjaan Jumlah harga persatuan pekerjaan 822,210.16
Keuntungan + overhead 10% Keuntungan + overhead 10% 82,221.02
Total (jumlah + keuntungan overhead 10%) Total (jumlah + keuntungan overhead 10%) 904,431.17

22 Pek. Custom Cladding Dinding Sudut VVIP 1 Multiplek meranti 12mm m² 0.3356 265,000.00 lbr 2.98 m² 5.94 5.94 1.99 1.99 88,926.17
2 Multiplek albasia 6mm m² 0.3356 75,000.00 lbr 2.98 m² 5.94 1.99 1.99 25,167.79
3 HPL CT 5498 T african teak m² 0.3356 171,000.00 lbr 2.98 m² 5.94 1.99 1.99 57,382.55
Bahan / 4 Rangka hollow galvanis 3x3 tebal 1mm m¹ 1.5039 98,000.00 btg 3.00 m¹ 26.80 8.93 8.93 147,384.96
material 5 Dextone silikon sealant akrilik warna putih pc 0.3367 40,000.00 pc 1.00 pc 2.00 2.00 2.00 13,468.01
6 Radilum hospital plint lurus m¹ 0.3367 90,000.00 btg 1.00 m¹ 2.00 2.00 2.00 30,303.03
7 Lem kg 0.2000 60,000.00 kaleng 0.60 kg 1.78 2.97 2.97 12,000.00
8 Paku/skrup kg 0.2500 7,500.00 bks 1.00 kg 1.49 1.49 1.49 1,875.00
13 Pekerja oh 1.5000 136,000.00 oh 204,000.00
Tenaga kerja /
14 Tukang Kayu oh 1.5000 145,000.00 oh 217,500.00
alat
15 Mandor oh 0.2500 155,000.00 oh 38,750.00
Jumlah harga persatuan pekerjaan Jumlah harga persatuan pekerjaan 836,757.51
Keuntungan + overhead 10% Keuntungan + overhead 10% 83,675.75
Total (jumlah + keuntungan overhead 10%) Total (jumlah + keuntungan overhead 10%) 920,433.27

23 Pek. Custom Backdrop TV VVIP 1 Multiplek meranti 12mm m² 0.3356 265,000.00 lbr 2.98 m² 5.58 5.58 1.87 1.87 88,926.17
2 Multiplek albasia 6mm m² 0.3356 75,000.00 lbr 2.98 m² 5.58 1.87 1.87 25,167.79
3 HPL CT 5498 T african teak m² 0.3356 171,000.00 lbr 2.98 m² 5.58 1.87 1.87 57,382.55
Bahan / 4 Rangka hollow galvanis 3x3 tebal 1mm m¹ 1.5562 98,000.00 btg 3.00 m¹ 26.05 8.68 8.68 152,502.99
material 5 Dextone silikon sealant akrilik warna putih pc 0.1792 40,000.00 pc 1.00 pc 1.00 1.00 1.00 7,168.46
6 Radilum hospital plint lurus m¹ 0.3441 90,000.00 btg 1.00 m¹ 1.92 1.92 1.92 30,967.74
7 Lem kg 0.2000 60,000.00 kaleng 0.60 kg 1.67 2.79 2.79 12,000.00
8 Paku/skrup kg 0.2500 7,500.00 bks 1.00 kg 1.40 1.40 1.40 1,875.00
13 Pekerja oh 1.5000 136,000.00 oh 204,000.00
Tenaga kerja /
14 Tukang Kayu oh 1.5000 145,000.00 oh 217,500.00
alat
15 Mandor oh 0.2500 155,000.00 oh 38,750.00
Jumlah harga persatuan pekerjaan Jumlah harga persatuan pekerjaan 836,240.70
Keuntungan + overhead 10% Keuntungan + overhead 10% 83,624.07
Total (jumlah + keuntungan overhead 10%) Total (jumlah + keuntungan overhead 10%) 919,864.77

24 Pek. Custom Backdrop TV VIP 1 Multiplek meranti 12mm m² 0.3280 265,000.00 lbr 2.98 m² 7.97 7.79 2.61 2.61 86,917.80
2 Multiplek albasia 6mm m² 0.3280 75,000.00 lbr 2.98 m² 7.79 2.61 2.61 24,599.38
3 HPL CT 7841 T steyr ash m² 0.3280 175,000.00 lbr 2.98 m² 7.79 2.61 2.61 57,398.55
Bahan / 4 Rangka hollow galvanis 3x3 tebal 1mm m¹ 1.4178 98,000.00 btg 3.00 m¹ 33.90 11.30 11.30 138,946.05
material 5 Dextone silikon sealant akrilik warna putih pc 0.1255 40,000.00 pc 1.00 pc 1.00 1.00 1.00 5,018.82
6 Radilum hospital plint lurus m¹ 0.3450 90,000.00 btg 1.00 m¹ 2.75 2.75 2.75 31,053.95
7 Lem kg 0.2000 60,000.00 kaleng 0.60 kg 2.39 3.99 3.99 12,000.00
8 Paku/skrup kg 0.2500 7,500.00 bks 1.00 kg 1.99 1.99 1.99 1,875.00
13 Pekerja oh 1.5000 136,000.00 oh 204,000.00
Tenaga kerja /
14 Tukang Kayu oh 1.5000 145,000.00 oh 217,500.00
alat
15 Mandor oh 0.2500 155,000.00 oh 38,750.00
Jumlah harga persatuan pekerjaan Jumlah harga persatuan pekerjaan 818,059.55
Keuntungan + overhead 10% Keuntungan + overhead 10% 81,805.96
Total (jumlah + keuntungan overhead 10%) Total (jumlah + keuntungan overhead 10%) 899,865.51

Analisa Harga Satuan - page 112 of 207


ANALISA HARGA SATUAN - PEKERJAAN TANAH

Pekerjaan : PERENCANAAN RUMAH SAKIT REGIONAL KELAS C KABUPATEN BONE


Mata Pembayaran : Pekerjaan Tanah
Spesifikasi : 1 m2 Tanah Subur dan Perataan Tanah
Kode Analisa : PUPR28 2016 T.14.a 1

HARGA JUMLAH
NO URAIAN SAT. VOL
SATUAN HARGA

A UPAH
1 Mandor HOK 0.0330 155,000.00 5,115.00
2 Pekerja HOK 0.3300 136,000.00 44,880.00
Sub Total A 49,995.00

B PERALATAN

Sub Total B -
C BAHAN
3 Top Soil Tanah Subur M3 1.0000 250,000.00 250,000.00
Sub Total C 250,000.00

D JUMLAH HARGA (A+B+C) 299,995.00


E JASA PELAKSANAAN 10% 29,999.50
F HARGA SATUAN Pekerjaan 329,994.50

Pekerjaan : PERENCANAAN RUMAH SAKIT REGIONAL KELAS C KABUPATEN BONE


Mata Pembayaran : Pekerjaan Tanah
Spesifikasi : 1 m2 Pekerjaan Pemasangan Geotextile Non Wover 150 gr
Kode Analisa : PUPR28 2016 P.09.a1

HARGA JUMLAH
NO URAIAN SAT. VOL
SATUAN HARGA

A UPAH
1 Mandor OH 0.0100 155,000.00 1,550.00
2 Tukang Gali/Tembok 0.0200 145,000.00 2,900.00
3 Pekerja OH 0.1000 136,000.00 13,600.00
Sub Total A 18,050.00

B PERALATAN
1 -
Sub Total B -
C BAHAN
1 Geotextile Non Woven 150 gr m3 1.0500 11,250.00 11,812.50
Sub Total C 11,812.50

D JUMLAH HARGA (A+B+C) 29,862.50


E JASA PELAKSANAAN 10% 2,986.25
F HARGA SATUAN Pekerjaan 32,848.75

Analisa Harga Satuan Pek. Landscape - page 113 of 208


ANALISA HARGA SATUAN - PEKERJAAN POHON

Pekerjaan : PERENCANAAN RUMAH SAKIT REGIONAL KELAS C KABUPATEN BONE


Mata Pembayaran : Pekerjaan Penanaman
Kelompok : Pohon
Jenis Tanaman : Yellow Flamboyant (Peltophorum pterocarpum)
Spesifikasi : Height 4-5 m, Dia. Trunk 10-12 cm
Kode Analisa : Analisa Taksir - PPN.PH.01

HARGA JUMLAH
NO URAIAN SAT. VOL
SATUAN HARGA

A UPAH
1 Mandor HOK 0.0030 155,000.0 465.0
2 Tukang HOK 0.0250 145,000.0 3,625.0
Sub Total A 4,090.0

B BAHAN
1 Furadan Kg 0.0010 21,000.0 21.0
2 Pupuk Kandang Krg 0.0800 250,000.0 20,000.0
3 NPK Kg 0.0500 82,000.0 4,100.0
4 Atonik Botol 0.0020 36,000.0 72.0
5 Bambu Steger (8-12 cm) Trunk 2.0000 25,000.0 50,000.0
6 Ijuk (Pengikat) Ikat 0.0500 7,500.0 375.0
Sub Total B 74,568.0
C MATERIAL
1 Yellow Flamboyant (Peltophorum pterocarpum) pohon 1.0000 250,000.0 250,000.0
` Sub Total C 250,000.0

D JUMLAH HARGA (A+B+C) 328,658.0


E JASA PELAKSANAAN 10% 32,865.8
F HARGA SATUAN Pekerjaan 361,523.8

Pekerjaan : PERENCANAAN RUMAH SAKIT REGIONAL KELAS C KABUPATEN BONE


Mata Pembayaran : Pekerjaan Penanaman
Kelompok : Pohon
Jenis Tanaman : Red Flamboyant (Delonix regia)
Spesifikasi : Height 4 m, Dia. Trunk 15 cm
Kode Analisa : Analisa Taksir - PPN.PH.02

HARGA JUMLAH
NO URAIAN SAT. VOL
SATUAN HARGA

A UPAH
1 Mandor HOK 0.0030 155,000.0 465.0
2 Tukang HOK 0.0250 145,000.0 3,625.0
Sub Total A 4,090.0

B BAHAN
1 Furadan Kg 0.0010 21,000.0 21.0
2 Pupuk Kandang Krg 0.0800 250,000.0 20,000.0
3 NPK Kg 0.0500 82,000.0 4,100.0
4 Atonik Botol 0.0020 36,000.0 72.0
5 Bambu Steger (8-12 cm) Trunk 2.0000 25,000.0 50,000.0
6 Ijuk (Pengikat) Ikat 0.0500 7,500.0 375.0
Sub Total B 74,568.0
C MATERIAL
1 Red Flamboyant (Delonix regia) pohon 1.0000 300,000.0 300,000.0
` Sub Total C 300,000.0

D JUMLAH HARGA (A+B+C) 378,658.0


E JASA PELAKSANAAN 10% 37,865.8
F HARGA SATUAN Pekerjaan 416,523.8

Analisa Harga Satuan Pek. Landscape - page 114 of 208


Pekerjaan : PERENCANAAN RUMAH SAKIT REGIONAL KELAS C KABUPATEN BONE
Mata Pembayaran : Pekerjaan Penanaman
Kelompok : Pohon
Jenis Tanaman : Trambesi (Samanea saman)
Spesifikasi : Height 4-5 m, Dia. Trunk 10-12 cm
Kode Analisa : Analisa Taksir - PPN.PH.5

HARGA JUMLAH
NO URAIAN SAT. VOL
SATUAN HARGA

A UPAH
1 Mandor HOK 0.0030 155,000.0 465.0
2 Tukang HOK 0.0250 145,000.0 3,625.0
Sub Total A 4,090.0

B BAHAN
1 Furadan Kg 0.0010 21,000.0 21.0
2 Pupuk Kandang Krg 0.0800 250,000.0 20,000.0
3 NPK Kg 0.0500 82,000.0 4,100.0
4 Atonik Botol 0.0020 36,000.0 72.0
5 Bambu Steger (8-12 cm) Trunk 2.0000 25,000.0 50,000.0
6 Ijuk (Pengikat) Ikat 0.0500 7,500.0 375.0
Sub Total C 74,568.0
C MATERIAL
1 Trambesi (Samanea saman) pohon 1.0000 750,000.0 750,000.0
` Sub Total D 750,000.0

D JUMLAH HARGA (A+B+C) 828,658.0


E JASA PELAKSANAAN 10% 82,865.8
F HARGA SATUAN Pekerjaan 911,523.8

Pekerjaan : PERENCANAAN RUMAH SAKIT REGIONAL KELAS C KABUPATEN BONE


Mata Pembayaran : Pekerjaan Penanaman
Kelompok : Pohon
Jenis Tanaman : Tabebuia Bunga Kuning
Spesifikasi : Height 4 m, Dia. Trunk 10-12 cm
Kode Analisa : Analisa Taksir - PPN.PH.6

HARGA JUMLAH
NO URAIAN SAT. VOL
SATUAN HARGA

A UPAH
1 Mandor HOK 0.0030 155,000.0 465.0
2 Tukang HOK 0.0250 145,000.0 3,625.0
Sub Total A 4,090.0

B BAHAN
1 Furadan Kg 0.0010 21,000.0 21.0
2 Pupuk Kandang Krg 0.0800 250,000.0 20,000.0
3 NPK Kg 0.0500 82,000.0 4,100.0
4 Atonik Botol 0.0020 36,000.0 72.0
5 Bambu Steger (8-12 cm) Trunk 2.0000 25,000.0 50,000.0
6 Ijuk (Pengikat) Ikat 0.0500 7,500.0 375.0
Sub Total C 74,568.0
C MATERIAL
1 Tabebuia Bunga Kuning pohon 1.0000 250,000.0 250,000.0
` Sub Total D 250,000.0

D JUMLAH HARGA (A+B+C) 328,658.0


E JASA PELAKSANAAN 10% 32,865.8
F HARGA SATUAN Pekerjaan 361,523.8

Analisa Harga Satuan Pek. Landscape - page 115 of 208


Pekerjaan : PERENCANAAN RUMAH SAKIT REGIONAL KELAS C KABUPATEN BONE
Mata Pembayaran : Pekerjaan Penanaman
Kelompok : Pohon
Jenis Tanaman : Ketapang Kencana
Spesifikasi : Height 4 m, Dia. Trunk 6-8 cm
Kode Analisa : Analisa Taksir - PPN.PH.7

HARGA JUMLAH
NO URAIAN SAT. VOL
SATUAN HARGA

A UPAH
1 Mandor HOK 0.0030 155,000.0 465.0
2 Tukang HOK 0.0250 145,000.0 3,625.0
Sub Total A 4,090.0

B BAHAN
1 Furadan Kg 0.0010 21,000.0 21.0
2 Pupuk Kandang Krg 0.0800 250,000.0 20,000.0
3 NPK Kg 0.0500 82,000.0 4,100.0
4 Atonik Botol 0.0020 36,000.0 72.0
5 Bambu Steger (8-12 cm) Trunk 2.0000 25,000.0 50,000.0
6 Ijuk (Pengikat) Ikat 0.0500 7,500.0 375.0
Sub Total C 74,568.0
C MATERIAL
1 Ketapang Kencana pohon 1.0000 350,000.0 350,000.0
` Sub Total D 350,000.0

D JUMLAH HARGA (A+B+C) 428,658.0


E JASA PELAKSANAAN 10% 42,865.8
F HARGA SATUAN Pekerjaan 471,523.8

Pekerjaan : PERENCANAAN RUMAH SAKIT REGIONAL KELAS C KABUPATEN BONE


Mata Pembayaran : Pekerjaan Penanaman
Kelompok : Pohon
Jenis Tanaman : Tabebuia Bunga Pink
Spesifikasi : Height 4 m, Dia. Trunk 10-12 cm
Kode Analisa : Analisa Taksir - PPN.PH.8

HARGA JUMLAH
NO URAIAN SAT. VOL
SATUAN HARGA

A UPAH
1 Mandor HOK 0.0030 155,000.0 465.0
2 Tukang HOK 0.0250 145,000.0 3,625.0
Sub Total A 4,090.0

B BAHAN
1 Furadan Kg 0.0010 21,000.0 21.0
2 Pupuk Kandang Krg 0.0800 250,000.0 20,000.0
3 NPK Kg 0.0500 82,000.0 4,100.0
4 Atonik Botol 0.0020 36,000.0 72.0
5 Bambu Steger (8-12 cm) Trunk 2.0000 25,000.0 50,000.0
6 Ijuk (Pengikat) Ikat 0.0500 7,500.0 375.0
Sub Total C 74,568.0
C MATERIAL
1 Tabebuia Bunga Pink pohon 1.0000 350,000.0 350,000.0
` Sub Total D 350,000.0

D JUMLAH HARGA (A+B+C) 428,658.0


E JASA PELAKSANAAN 10% 42,865.8
F HARGA SATUAN Pekerjaan 471,523.8

Analisa Harga Satuan Pek. Landscape - page 116 of 208


Pekerjaan : PERENCANAAN RUMAH SAKIT REGIONAL KELAS C KABUPATEN BONE
Mata Pembayaran : Pekerjaan Penanaman
Kelompok : Pohon
Jenis Tanaman : Pulai Fosil
Spesifikasi : Height 6-7 m, Dia. Trunk 80-100 cm
Kode Analisa : Analisa Taksir - PPN.PH.09

HARGA JUMLAH
NO URAIAN SAT. VOL
SATUAN HARGA

A UPAH
1 Mandor HOK 0.0030 155,000.0 465.0
2 Tukang HOK 0.0250 145,000.0 3,625.0
Sub Total A 4,090.0

B BAHAN
1 Furadan Kg 0.0010 21,000.0 21.0
2 Pupuk Kandang Krg 0.0800 250,000.0 20,000.0
3 NPK Kg 0.0500 82,000.0 4,100.0
4 Atonik Botol 0.0020 36,000.0 72.0
5 Bambu Steger (8-12 cm) Trunk 2.0000 25,000.0 50,000.0
6 Ijuk (Pengikat) Ikat 0.0500 7,500.0 375.0
Sub Total C 74,568.0
C MATERIAL
1 Pulai Fosil pohon 1.0000 2,350,000.0 2,350,000.0
` Sub Total D 2,350,000.0

D JUMLAH HARGA (A+B+C) 2,428,658.0


E JASA PELAKSANAAN 10% 242,865.8
F HARGA SATUAN Pekerjaan 2,671,523.8

Pekerjaan : PERENCANAAN RUMAH SAKIT REGIONAL KELAS C KABUPATEN BONE


Mata Pembayaran : Pekerjaan Penanaman
Kelompok : Pohon
Jenis Tanaman : Kelapa
Spesifikasi : Height 3,5-4 m, Dia. Trunk 15-20 cm
Kode Analisa : Analisa Taksir - PPN.PH.10

HARGA JUMLAH
NO URAIAN SAT. VOL
SATUAN HARGA

A UPAH
1 Mandor HOK 0.0030 155,000.0 465.0
2 Tukang HOK 0.0250 145,000.0 3,625.0
Sub Total A 4,090.0

B BAHAN
1 Furadan Kg 0.0010 21,000.0 21.0
2 Pupuk Kandang Krg 0.0800 250,000.0 20,000.0
3 NPK Kg 0.0500 82,000.0 4,100.0
4 Atonik Botol 0.0020 36,000.0 72.0
5 Bambu Steger (8-12 cm) Trunk 2.0000 25,000.0 50,000.0
6 Ijuk (Pengikat) Ikat 0.0500 7,500.0 375.0
Sub Total C 74,568.0
C MATERIAL
1 Kelapa pohon 1.0000 350,000.0 350,000.0
` Sub Total D 350,000.0

D JUMLAH HARGA (A+B+C) 428,658.0


E JASA PELAKSANAAN 10% 42,865.8
F HARGA SATUAN Pekerjaan 471,523.8

Analisa Harga Satuan Pek. Landscape - page 117 of 208


ANALISA HARGA SATUAN - PEKERJAAN SEMAK

Pekerjaan : PERENCANAAN RUMAH SAKIT REGIONAL KELAS C KABUPATEN BONE


Mata Pembayaran : Pekerjaan Penanaman
Kelompok : Semak
Jenis Tanaman : Spider Lily (Hymenocalis littoralis)
Spesifikasi : Height 30 cm
Kode Analisa : Analisa Taksir - PPN.SM.01

HARGA JUMLAH
NO URAIAN SAT. VOL
SATUAN HARGA

A UPAH
1 Mandor HOK 0.0020 155,000
2 Tukang HOK 0.0200 145,000 2,900
Sub Total A 2,900

B BAHAN
1 Pupuk Kandang Karung 0.0400 250,000 10,000
2 Furadan Kg 0.0010 21,000 21
3 NPK Kg 0.0500 82,000 4,100
4 Atonik Botol 0.0020 36,000 72
Sub Total B 14,193
C MATERIAL
1 Spider Lily (Hymenocalis littoralis) polybag 36 12,500 450,000
` Sub Total C 450,000

D JUMLAH HARGA (A+B+C) 467,093.00


E JASA PELAKSANAAN 10% 46,709.30
F HARGA SATUAN Pekerjaan 513,802.30

Pekerjaan : PERENCANAAN RUMAH SAKIT REGIONAL KELAS C KABUPATEN BONE


Mata Pembayaran : Pekerjaan Penanaman
Kelompok : Semak
Jenis Tanaman : Soka
Spesifikasi : Height 30-40 cm
Kode Analisa : Analisa Taksir - PPN.SM.02

HARGA JUMLAH
NO URAIAN SAT. VOL
SATUAN HARGA

A UPAH
1 Mandor HOK 0.0020 155,000 310
2 Tukang HOK 0.0200 145,000 2,900
Sub Total A 3,210

B BAHAN
1 Pupuk Kandang Karung 0.0400 250,000 10,000
2 Furadan Kg 0.0010 21,000 21
3 NPK Kg 0.0500 82,000 4,100
4 Atonik Botol 0.0020 36,000 72
Sub Total B 14,193
C MATERIAL
1 Soka polybag 10 25,000 250,000
` Sub Total C 250,000

D JUMLAH HARGA (A+B+C) 267,403.00


E JASA PELAKSANAAN 10% 26,740.30
F HARGA SATUAN Pekerjaan 294,143.30

Analisa Harga Satuan Pek. Landscape - page 118 of 208


Pekerjaan : PERENCANAAN RUMAH SAKIT REGIONAL KELAS C KABUPATEN BONE
Mata Pembayaran : Pekerjaan Penanaman
Kelompok : Semak
Jenis Tanaman : Canna generalis
Spesifikasi : Height 40-50 cm
Kode Analisa : Analisa Taksir - PPN.SM.03

HARGA JUMLAH
NO URAIAN SAT. VOL
SATUAN HARGA

A UPAH
1 Mandor HOK 0.0020 155,000 310
2 Tukang HOK 0.0200 145,000 2,900
Sub Total A 3,210

B BAHAN
1 Pupuk Kandang Karung 0.0400 250,000 10,000
2 Furadan Kg 0.0010 21,000 21
3 NPK Kg 0.0500 82,000 4,100
4 Atonik Botol 0.0020 36,000 72
Sub Total B 14,193
C MATERIAL
1 Canna generalis polybag 10 25,000 250,000
` Sub Total C 250,000

D JUMLAH HARGA (A+B+C) 267,403.00


E JASA PELAKSANAAN 10% 26,740.30
F HARGA SATUAN Pekerjaan 294,143.30

Pekerjaan : PERENCANAAN RUMAH SAKIT REGIONAL KELAS C KABUPATEN BONE


Mata Pembayaran : Pekerjaan Penanaman
Kelompok : Semak
Jenis Tanaman : Golden Torch (Heliconia pssitacorum)
Spesifikasi : Height 30-40 cm
Kode Analisa : Analisa Taksir - PPN.SM.04

HARGA JUMLAH
NO URAIAN SAT. VOL
SATUAN HARGA

A UPAH
1 Mandor HOK 0.0020 155,000 310
2 Tukang HOK 0.0200 145,000 2,900
Sub Total A 3,210

B BAHAN
1 Pupuk Kandang Karung 0.0400 250,000 10,000
2 Furadan Kg 0.0010 21,000 21
3 NPK Kg 0.0500 82,000 4,100
4 Atonik Botol 0.0020 36,000 72
Sub Total B 14,193
C MATERIAL
1 Golden Torch (Heliconia pssitacorum) polybag 10 37,500 375,000
` Sub Total C 375,000

D JUMLAH HARGA (A+B+C) 392,403.00


E JASA PELAKSANAAN 10% 39,240.30
F HARGA SATUAN Pekerjaan 431,643.30

Analisa Harga Satuan Pek. Landscape - page 119 of 208


Pekerjaan : PERENCANAAN RUMAH SAKIT REGIONAL KELAS C KABUPATEN BONE
Mata Pembayaran : Pekerjaan Penanaman
Kelompok : Semak
Jenis Tanaman : Bougenvillea
Spesifikasi : Height 30-40 cm
Kode Analisa : Analisa Taksir - PPN.SM.07

HARGA JUMLAH
NO URAIAN SAT. VOL
SATUAN HARGA

A UPAH
1 Mandor HOK 0.0020 155,000 310
2 Tukang HOK 0.0200 145,000 2,900
Sub Total A 3,210

B BAHAN
1 Pupuk Kandang Karung 0.0400 250,000 10,000
2 Furadan Kg 0.0010 21,000 21
3 NPK Kg 0.0500 82,000 4,100
4 Atonik Botol 0.0020 36,000 72
Sub Total B 14,193
C MATERIAL
1 Bougenvillea polybag 16 35,000 560,000
` Sub Total C 560,000

D JUMLAH HARGA (A+B+C) 577,403.00


E JASA PELAKSANAAN 10% 57,740.30
F HARGA SATUAN Pekerjaan 635,143.30

Pekerjaan : PERENCANAAN RUMAH SAKIT REGIONAL KELAS C KABUPATEN BONE


Mata Pembayaran : Pekerjaan Penanaman
Kelompok : Semak
Jenis Tanaman : Walisongo (Schefllera arboricola )
Spesifikasi : Height 30-35 cm
Kode Analisa : Analisa Taksir - PPN.SM.08

HARGA JUMLAH
NO URAIAN SAT. VOL
SATUAN HARGA

A UPAH
1 Mandor HOK 0.0020 155,000 310
2 Tukang HOK 0.0200 145,000 2,900
Sub Total A 3,210

B BAHAN
1 Pupuk Kandang Karung 0.0400 250,000 10,000
2 Furadan Kg 0.0010 21,000 21
3 NPK Kg 0.0500 82,000 4,100
4 Atonik Botol 0.0020 36,000 72
Sub Total B 14,193
C MATERIAL
1 Walisongo (Schefllera arboricola) polybag 36 30,000 1,080,000
` Sub Total C 1,080,000

D JUMLAH HARGA (A+B+C) 1,097,403.00


E JASA PELAKSANAAN 10% 109,740.30
F HARGA SATUAN Pekerjaan 1,207,143.30

Analisa Harga Satuan Pek. Landscape - page 120 of 208


Pekerjaan : PERENCANAAN RUMAH SAKIT REGIONAL KELAS C KABUPATEN BONE
Mata Pembayaran : Pekerjaan Penanaman
Kelompok : Semak
Jenis Tanaman : Yellow peanut (Arachis pintoi)
Spesifikasi : Height 5 cm
Kode Analisa : Analisa Taksir - PPN.SM.09

HARGA JUMLAH
NO URAIAN SAT. VOL
SATUAN HARGA

A UPAH
1 Mandor HOK 0.0020 155,000 310
2 Tukang HOK 0.0200 145,000 2,900
Sub Total A 3,210

B BAHAN
1 Pupuk Kandang Karung 0.0400 250,000 10,000
2 Furadan Kg 0.0010 21,000 21
3 NPK Kg 0.0500 82,000 4,100
4 Atonik Botol 0.0020 36,000 72
Sub Total B 14,193
C MATERIAL
1 Yellow peanut (Arachis pintoi) polybag 10 32,000 320,000
` Sub Total C 320,000

D JUMLAH HARGA (A+B+C) 337,403.00


E JASA PELAKSANAAN 10% 33,740.30
F HARGA SATUAN Pekerjaan 371,143.30

Pekerjaan : PERENCANAAN RUMAH SAKIT REGIONAL KELAS C KABUPATEN BONE


Mata Pembayaran : Pekerjaan Penanaman
Kelompok : Rumput
Jenis Tanaman : Rumput Bermuda - Hydroseeding
Spesifikasi :
Kode Analisa : Analisa Taksir - PPN.SM.10

HARGA JUMLAH
NO URAIAN SAT. VOL
SATUAN HARGA

A UPAH
1 Mandor HOK 0.0020 155,000 310
2 Tukang HOK 0.0200 145,000 2,900
Sub Total A 3,210

B BAHAN
1 Pupuk Kandang Karung 0.0400 250,000 10,000
2 Furadan Kg 0.0010 21,000 21
3 NPK Kg 0.0500 82,000 4,100
4 Atonik Botol 0.0020 36,000 72
Sub Total B 14,193
C MATERIAL
1 Rumput Bermuda - Hydroseeding m2 1 30,000 30,000
` Sub Total C 30,000

D JUMLAH HARGA (A+B+C) 47,403.00


E JASA PELAKSANAAN 10% 4,740.30
F HARGA SATUAN Pekerjaan 52,143.30

Analisa Harga Satuan Pek. Landscape - page 121 of 208


Pekerjaan : PERENCANAAN RUMAH SAKIT REGIONAL KELAS C KABUPATEN BONE
Mata Pembayaran : Pekerjaan Penanaman
Kelompok : Rumput
Jenis Tanaman : Gardenia jasminoides
Spesifikasi :
Kode Analisa : Analisa Taksir - PPN.SM.11

HARGA JUMLAH
NO URAIAN SAT. VOL
SATUAN HARGA

A UPAH
1 Mandor HOK 0.0020 155,000 310
2 Tukang HOK 0.0200 145,000 2,900
Sub Total A 3,210

B BAHAN
1 Pupuk Kandang Karung 0.0400 250,000 10,000
2 Furadan Kg 0.0010 21,000 21
3 NPK Kg 0.0500 82,000 4,100
4 Atonik Botol 0.0020 36,000 72
Sub Total B 14,193
C MATERIAL
1 Gardenia jasminoides m2 25 35,000 875,000
` Sub Total C 875,000

D JUMLAH HARGA (A+B+C) 892,403.00


E JASA PELAKSANAAN 10% 89,240.30
F HARGA SATUAN Pekerjaan 981,643.30

Pekerjaan : PERENCANAAN RUMAH SAKIT REGIONAL KELAS C KABUPATEN BONE


Mata Pembayaran : Pekerjaan Penanaman
Kelompok : Tanaman Rambat
Jenis Tanaman : Thunbergia
Spesifikasi : 50-60 cm
Kode Analisa : Analisa Taksir - PPN.SM.12

HARGA JUMLAH
NO URAIAN SAT. VOL
SATUAN HARGA

A UPAH
1 Mandor HOK 0.0020 155,000 310
2 Tukang HOK 0.0200 145,000 2,900
Sub Total A 3,210

B BAHAN
1 Pupuk Kandang Karung 0.0400 250,000 10,000
2 Furadan Kg 0.0010 21,000 21
3 NPK Kg 0.0500 82,000 4,100
4 Atonik Botol 0.0020 36,000 72
Sub Total B 14,193
C MATERIAL
1 Thunbergia m' 11 20,000 220,000
` Sub Total C 220,000

D JUMLAH HARGA (A+B+C) 237,403.00


E JASA PELAKSANAAN 10% 23,740.30
F HARGA SATUAN Pekerjaan 261,143.30

Analisa Harga Satuan Pek. Landscape - page 122 of 208


Pekerjaan : PERENCANAAN RUMAH SAKIT REGIONAL KELAS C KABUPATEN BONE
Mata Pembayaran : Pekerjaan Penanaman
Kelompok : Semak
Jenis Tanaman : Kemuning
Spesifikasi : 25-30 cm
Kode Analisa : Analisa Taksir - PPN.SM.12

HARGA JUMLAH
NO URAIAN SAT. VOL
SATUAN HARGA

A UPAH
1 Mandor HOK 0.0020 155,000 310
2 Tukang HOK 0.0200 145,000 2,900
Sub Total A 3,210

B BAHAN
1 Pupuk Kandang Karung 0.0400 250,000 10,000
2 Furadan Kg 0.0010 21,000 21
3 NPK Kg 0.0500 82,000 4,100
4 Atonik Botol 0.0020 36,000 72
Sub Total B 14,193
C MATERIAL
1 Kemuning m2 36 25,000 900,000
` Sub Total C 900,000

D JUMLAH HARGA (A+B+C) 917,403.00


E JASA PELAKSANAAN 10% 91,740.30
F HARGA SATUAN Pekerjaan 1,009,143.30

Pekerjaan : PERENCANAAN RUMAH SAKIT REGIONAL KELAS C KABUPATEN BONE


Mata Pembayaran : Pekerjaan Penanaman
Kelompok : Semak
Jenis Tanaman : Selloum
Spesifikasi : 50-60 cm
Kode Analisa : Analisa Taksir - PPN.SM.12

HARGA JUMLAH
NO URAIAN SAT. VOL
SATUAN HARGA

A UPAH
1 Mandor HOK 0.0020 155,000 310
2 Tukang HOK 0.0200 145,000 2,900
Sub Total A 3,210

B BAHAN
1 Pupuk Kandang Karung 0.0400 250,000 10,000
2 Furadan Kg 0.0010 21,000 21
3 NPK Kg 0.0500 82,000 4,100
4 Atonik Botol 0.0020 36,000 72
Sub Total B 14,193
C MATERIAL
1 Selloum m2 16 37,500 600,000
` Sub Total C 600,000

D JUMLAH HARGA (A+B+C) 617,403.00


E JASA PELAKSANAAN 10% 61,740.30
F HARGA SATUAN Pekerjaan 679,143.30

Analisa Harga Satuan Pek. Landscape - page 123 of 208


DAFTAR HARGA BAHAN DAN UPAH MEKANIKAL,PLUMBING & ELEKTRIKAL
PEKERJAAN PEMBANGUNAN RUMAH SAKIT REGIONAL
KELAS C KABUPATEN BONE - TAHAP LANJUTAN
TAHUN ANGGARAN 2023

NO URAIAN HARGA SATUAN


A. DAFTAR UPAH
1 Pekerja Rp 136,000 hari
2 Tukang pipa Rp 145,000 hari
3 Tukang listrik Rp 145,000 hari
4 Tukang AC Rp 145,000 hari
5 Kepala tukang AC Rp 155,000 hari
6 Kepala tukang listrik Rp 155,000 hari
7 Kepala tukang pipa Rp 155,000 hari
8 Mandor Rp 155,000 hari

B. PEKERJAAN VAC :
1 TD ducting panel density +/- 52 kg /m3 m¹
2 Invisible flange ( PVC ) m¹
3 Tee connector flange ( PVC ) m¹
4 Bayonet ( PVC ) m¹
5 Covering angle ( PVC ) bh
6 TD Glue Kg
7 Sealant neutral ( with colour ) Botol
8 Chair saction bar Allumunium m¹
9 "F" section bar Allumunium m¹
10 Shaped disk Allumunium bh
11 Reinforcenent bar Allumunium m¹
12 Ball joint damper ( Allumunium ) bh
13 Ball joint damper ( plastik ) bh
14 Allumunium Tape m¹
15 Zinc cozted bh
16 BJLS 80 m2
17 Ducting Suppply lengkap dengan isolasi Flexycell XLPE material, dencity >25 Kg/m3 , m2
K= (0,03-0,04) W/mK, Fire Retardant Class O (Std BS 476) min thickness 25 mm w/ Self Adhesive
18 Duct tapes m2
19 PENGGANTUNG DUCTING Set
20 Difuser / Grille ( Alumunium ) + OBD inchi
21 Difuser / Grille ( Alumunium ) inchi
22 Exhaust Air Grille ( EAG ) inchi
23 Air Louvre Rp 450,000 inchi
24 Pipa Refrigerant dia, 3/8 " Rp 186,000 m'
25 Pipa Refrigerant dia, 3/4 " Rp 150,000 m'
26 Isolasi Pipa dia/ 2 " Rp 23,000 m'
27 Isolasi Pipa dia/ 1 1/2 " Rp 19,000 m'
28 Isolasi Pipa dia/ 1 " Rp 15,000 m'
29 Isolasi Pipa dia/ 3/4 " Rp 12,000 m'
30 Isolasi Pipa dia/ 3/8 " Rp 10,000 m'
31 Isolasi Pipa dia/ 1/2 " Rp 9,000 m'
32 Intake Fan , Kapasitas : 7000 CFM, Inline type unit
33 Intake Fan , Kapasitas : 7500 CFM, Inline type unit
34 Intake Fan , Kapasitas : 1226 CFM, Inline type unit
35 Intake Fan , Kapasitas : 1209 CFM, Inline type unit
36 Intake Fan, Kapasitas : 550 CFM, Inline type unit
37 Intake Fan, Kapasitas : 150 CFM, Inline type unit
38 Intake Fan, Kapasitas : 100 CFM, Inline type unit
39 Fan Filter Unit, Kapasitas : 1600 CFM, Inline type unit
40 Fan Filter Unit, Kapasitas : 1200 CFM, Inline type unit
41 Fan Filter Unit, Kapasitas : 930 CFM, Inline type unit
42 Fan Filter Unit, Kapasitas : 1000 CFM, Inline type unit
43 Fan Filter Unit, Kapasitas : 1100 CFM, Inline type unit
44 Fan Filter Unit, Kapasitas : 813 CFM, Inline type unit
45 Fan Filter Unit, Kapasitas : 800 CFM, Inline type unit

Bahan MEP - page 124 of 209


NO URAIAN HARGA SATUAN
46 Fan Filter Unit, Kapasitas : 450 CFM, Inline type unit
47 Exhaust Fan, Kapasitas : 9000 CFM, Inline type unit
48 Exhaust Fan , Kapasitas : 7500 CFM, Inline type unit
49 Exhaust Fan, Kapasitas : 2000 CFM, Wall type unit
50 Exhaust Fan, Kapasitas : 1200 CFM, Wall type unit
51 Exhaust Fan, Kapasitas : 1260 CFM, Wall type unit
52 Exhaust Fan, Kapasitas : 1029 CFM, Wall type unit
53 Exhaust Fan, Kapasitas : 900 CFM, Inline type unit
54 Exhaust Fan, Kapasitas : 800 CFM, Inline type unit
55 Exhaust Fan, Kapasitas : 750 CFM, Inline type unit
56 Exhaust Fan, Kapasitas : 650 CFM, Inline type unit
57 Exhaust Fan, Kapasitas : 450 CFM, Inline type unit
58 Exhaust Fan, Kapasitas : 400 CFM, Inline type unit
59 Exhaust Fan, Kapasitas : 300 CFM, Inline type Rp 2,500,000 unit
60 Exhaust Fan, Kapasitas : 350 CFM, Inline type unit
61 Exhaust Fan, Kapasitas : 250 CFM, Inline type unit
62 Exhaust Fan, Kapasitas : 1260 CFM, Wall type unit
63 Exhaust Fan, Kapasitas : 400 CFM, Wall type unit
64 Exhaust Fan, Kapasitas : 350 CFM, Wall type unit
65 Exhaust Fan, Kapasitas : 300 CFM, Wall type unit
66 Exhaust Fan, Kapasitas : 250 CFM, Wall type unit
67 Extract Fan, Kapasitas : 200 CFM, Ceiling type unit
68 Extract Fan, Kapasitas : 150 CFM, Ceiling type unit
69 Extract Fan, Kapasitas : 100 CFM, Ceiling type Rp 650,000 unit
70 Extract Fan, Kapasitas : 50 CFM, Ceiling type unit

71 AC Split kapasitas : 1/4 PK - Wall type - Daikin unit


72 AC Split kapasitas : 1/2 PK - Wall type - Daikin unit
73 AC Split kapasitas : 3/4 PK - Wall type - Daikin unit
74 AC Split kapasitas : 1 PK - Wall type - Daikin unit
75 AC Split kapasitas : 1 1/4 PK - Wall type - Daikin unit
76 AC Split kapasitas : 1 1/2 PK - Wall type - Daikin Rp 5,500,000 unit
77 AC Split kapasitas : 1 3/4 PK - Wall type - Daikin unit
78 AC Split kapasitas : 2 PK - Wall type - Daikin unit
79 AC Split kapasitas : 2 1/4 PK - Wall type - Daikin unit
80 AC Split kapasitas : 2 1/2 PK - Wall type - Daikin unit
81 AC Split kapasitas : 2 3/4 PK - Wall type - Daikin unit
82 AC Split kapasitas : 1 1/2 PK - Cassete type - Daikin unit
83 AC Split kapasitas : 1 3/4 PK - Cassete type - Daikin unit
84 AC Split kapasitas : 2 PK - Cassete type - Daikin unit
85 AC Split kapasitas : 2 1/4 PK - Cassete type - Daikin Rp 26,500,000 unit
86 AC Split kapasitas : 2 1/2 PK - Cassete type - Daikin unit
87 AC Split kapasitas : 3 PK - Cassete type - Daikin unit
88 AC Split kapasitas : 3 1/4K - Cassete type - Daikin unit
89 AC Split kapasitas : 3 1/2 PK - Cassete type - Daikin unit
90 AC Split kapasitas : 3 3/4 PK - Cassete type - Daikin unit
91 AC Split kapasitas : 4 PK - Cassete type - Daikin unit
92 AC Split kapasitas : 4 1/4 PK - Cassete type - Daikin unit
93 AC Split kapasitas : 4 1/2 PK - Cassete type - Daikin unit
94 AC Split kapasitas : 5 PK - Cassete type - Daikin unit
95 AC Split kapasitas : 5 1/2 PK - Cassete type - Daikin unit
96 AC Split kapasitas : 6 PK - Cassete type - Daikin unit

97 Indoor + Outdoor (AHU.OK.1 + CU.1)


System : Precision Active Heat Pipe
IU Cooling Capacity (Nominal) : 50 000 BTUH
98 Indoor + Outdoor Unit AC single split Duct Type
AHU + CU, kapasitas : 324 000 BTU/h - Duct type - Daikin unit
AHU + CU, kapasitas : 247 404 BTU/h - Duct type - Daikin unit
FCU + CU, kapasitas : 126 000 BTU/h - Duct type - Daikin unit
FCU + CU, kapasitas : 97 000 BTU/h - Duct type - Daikin unit
FCU + CU, kapasitas : 80 000 BTU/h - Duct type - Daikin unit
FCI + CU, kapasitas : 72 000 BTU/h - Duct type - Daikin unit
FCU + CU, kapasitas : 60 000 BTU/h - Duct type - Daikin unit

Bahan MEP - page 125 of 209


NO URAIAN HARGA SATUAN
FCI + CU, kapasitas : 35 000 BTU/h - Duct type - Daikin unit
FCU + CU, kapasitas :32 000 BTU/h - Duct type - Daikin unit
FCU + CU, kapasitas :25 000 BTU/h - Duct type - Daikin unit
99 Outdoor Unit VRV
OU, kapasitas : 425 000 BTU/h - Daikin unit
OU, kapasitas : 415 000 BTU/h - Daikin unit
OU, kapasitas : 379 000 BTU/h - Daikin unit
OU, kapasitas : 372 000 BTU/h - Daikin unit
OU, kapasitas : 366 000 BTU/h - Daikin unit
OU, kapasitas : 362 000 BTU/h - Daikin unit
OU, kapasitas : 338 000 BTU/h - Daikin unit
OU, kapasitas : 320 000 BTU/h - Daikin unit
OU, kapasitas : 300 000 BTU/h - Daikin unit
OU, kapasitas : 281 000 BTU/h - Daikin unit
OU, kapasitas : 278 000 BTU/h - Daikin unit
OU, kapasitas : 209 000 BTU/h - Daikin unit
OU, kapasitas : 198 000 BTU/h - Daikin unit
OU, kapasitas : 190 000 BTU/h - Daikin unit
Outdoor Unit VRV, kapasitas : 362 000 BTU/h - Daikin unit
Outdoor Unit VRV, kapasitas : 236 770 BTU/h - Daikin unit
Outdoor Unit VRV, kapasitas : 308 400 BTU/h - Daikin unit
Outdoor Unit VRV, kapasitas : 299 500 BTU/h - Daikin unit
Outdoor Unit VRV, kapasitas : 232 300 BTU/h - Daikin unit
Outdoor Unit VRV, kapasitas : 174 300 BTU/h - Daikin unit

100 Indoor Unit VRV


IU, kapasitas : 32 000 BTU/h - Cassete type - Daikin unit
IU, kapasitas : 27 500 BTU/h - Cassete type - Daikin unit
IU, kapasitas : 25 000 BTU/h - Cassete type - Daikin unit
IU, kapasitas : 23 900 BTU/h - Cassete type - Daikin unit
IU, kapasitas : 23 300 BTU/h - Cassete type - Daikin unit
IU, kapasitas : 22 200 BTU/h - Cassete type - Daikin unit
IU, kapasitas : 21 500 BTU/h - Cassete type - Daikin unit
IU, kapasitas : 19 800 BTU/h - Cassete type - Daikin unit
IU, kapasitas : 19 200 BTU/h - Cassete type - Daikin unit
IU, kapasitas : 18 400 BTU/h - Cassete type - Daikin unit
IU, kapasitas : 18 000 BTU/h - Cassete type - Daikin unit
IU, kapasitas : 17 700 BTU/h - Cassete type - Daikin unit
IU, kapasitas : 16 000 BTU/h - Cassete type - Daikin unit
IU, kapasitas : 14 000 BTU/h - Cassete type - Daikin unit
IU, kapasitas : 12 200 BTU/h - Cassete type - Daikin unit
IU, kapasitas : 12 000 BTU/h - Cassete type - Daikin unit
IU, kapasitas : 10 500 BTU/h - Cassete type - Daikin unit
IU, kapasitas : 14 400 BTU/h - Wall type - Daikin unit
IU, kapasitas : 11 900 BTU/h - Wall type - Daikin unit
IU, kapasitas : 11 200 BTU/h - Wall type - Daikin unit
IU, kapasitas : 8 400 BTU/h - Wall type - Daikin unit
IU, kapasitas : 8 000 BTU/h - Wall type - Daikin unit
IU, kapasitas : 7 810 BTU/h - Wall type - Daikin unit
IU, kapasitas : 7 500 BTU/h - Wall type - Daikin unit
IU, kapasitas : 5 800 BTU/h - Wall type - Daikin unit
IU, kapasitas : 4 900 BTU/h - Wall type - Daikin unit

101 Outdoor Procesing Include Remote GF.1,kapasitas : 47 800 BTU/h - Daikin unit
102 Outdoor Procesing Include Remote GF.2,kapasitas : 76 400 BTU/h - Daikin unit
103 Outdoor Procesing Include Remote GF.3,kapasitas : 95 500 BTU/h - Daikin unit

104 Pemipaan ( Refrigerant ) m'


105 Pemipaan ( Drain ) m'
106 Pipa Cabang Outdoor bh
107 Pipa Cabang Indoor bh
108 Remote WIRED CONTROL bh
109 Main Controller bh
110 Gravity Damper 8" x 8" inchi

Bahan MEP - page 126 of 209


NO URAIAN HARGA SATUAN
111 Gravity Damper 10" x 10" inchi
112 Gravity Damper 14" x 14" inchi
113 Hefa Filter 24 " x 24 " bh
114 Housing box 24 " x 24 " bh

C. PEKERJAAN FIRE HYDRANT


1 Fire House Cabinet (Indoor ) include hose, nozzle, rack Rp 4,650,000 bh
2 PILLAR HYDRANT Rp 1,550,000 bh
3 SIAMESE CONNECTION Rp 2,625,000 bh
4 Fire Extinguisher ( Dry Chemical ) Kap. 6 Kg Rp 1,250,000 bh
5 Dudukan Fire Extinguisher Rp 250,000 bh
6 Diesel Fire Pump kapasitas 1000 Usgpm Head 100 Meter - Wilo Rp 330,500,000 unit
7 Electric Fire Pump kapasitas 1000 Usgpm Head 100 Meter - Wilo Rp 248,500,000 unit
8 Jockey Fire Pump kapasitas 25 Usgpm Head 110 Meter - Wilo Rp 42,500,000 unit
9 Automatic Diesel Pump kap. 600 Usgpm Rp 125,500,000 unit
10 Diapraghma Tank Kap. 100 liter Rp 2,300,000 unit
11 Daily Tank Volume 200Lt Rp 1,800,000 unit
12 Horn Buzzer Rp 300,000 bh
13 Hand Pump Rp 1,500,000 unit
14 Electroda Water Level Control Rp 3,500,000 unit
15 Alarm Check Valve dia. 100 mm Rp 5,750,000 unit
16 FLEXIBLE JOINT DIA 200 MM / 16K Rp 2,900,000 bh
17 FLEXIBLE JOINT DIA 150 MM/ 16K Rp 1,780,000 bh
18 FLEXIBLE JOINT DIA 100 MM/ 16K Rp 850,000 bh
19 FLEXIBLE JOINT DIA 80 MM/ 16K Rp 680,000 bh
20 FLEXIBLE JOINT DIA 65 MM/ 16K Rp 550,000 bh
21 FLEXIBLE JOINT DIA 50 MM/ 16K Rp 450,000 bh
22 FLEXIBLE JOINT DIA 40 MM/ 16K Rp 350,000 bh
23 FLEXIBLE JOINT DIA 32 MM/ 16K Rp 240,000 bh
24 FLEXIBLE JOINT DIA 25 MM/ 16K Rp 190,000 bh
25 CHECK VALVE DIA 150 MM / 16K Rp 29,775,000 bh
26 CHECK VALVE DIA 100 MM / 16K Rp 18,458,000 bh
27 CHECK VALVE DIA 65 MM / 16K Rp 11,560,000 bh
28 CHECK VALVE DIA 50 MM / 16K Rp 3,900,000 bh
29 CHECK VALVE DIA 25 MM / 16K Rp 2,250,000 bh
30 CONTROL VALVE DIA. 65 MM / 16K Rp 2,950,000 bh
31 GATE VALVE DIA. 150 MM / 16K Rp 11,879,999 bh
32 GATE VALVE DIA. 200MM / 16K Rp 37,100,000 bh
33 GATE VALVE DIA.25 MM / 16K Rp 3,750,000 bh
34 GATE VALVE DIA.40 MM / 16K Rp 6,850,000 bh
35 GATE VALVE DIA.50 MM / 16K Rp 7,900,000 bh
36 GATE VALVE DIA.65 MM / 16K Rp 8,750,000 bh
37 GATE VALVE DIA.80 MM / 16K Rp 9,260,000 bh
38 GATE VALVE DIA.100 MM / 16K Rp 12,500,000 bh
39 FOOT VALVE DIA.65 MM / 10 Kg Rp 8,750,000 bh
40 FOOT VALVE DIA. 200 MM / 16Kg Rp 13,500,000 bh
41 STRAINER DIA.50 MM Rp 650,000 bh
42 Indicating valve 100 mm Rp 1,500,000 bh
43 Plat Orifice 100 mm Rp 2,300,000 bh
44 Plat Orifice 50 mm Rp 1,800,000 bh
45 Water Hammer Rp 320,000 bh
46 SIGHT GLASS Rp 3,000,000 bh
47 WATER FLOW SWITCH Rp 2,500,000 bh
48 FLUSHING VALVE DIA.40 MM Rp 1,500,000 bh
49 Bak Kontrol Rp 450,000 bh
50 Pressure Gauge Rp 650,000 bh
51 Pressure Switch Rp 2,350,000 bh
52 Water Level Control Rp 450,000 bh
53 Water Level Switch Rp 500,000 bh
54 Safety Relief Valve dia. 40 mm Rp 17,500,000 bh
55 Alarm Check valve dia. 100 mm Rp 10,250,000 bh
56 Main Control Valve diameter 150 mm Rp 7,500,000 set
57 Branch Control Valve diameter 100 mm Rp 10,500,000 set
58 Branch Control Valve diameter 80 mm Rp 7,500,000 set

Bahan MEP - page 127 of 209


NO URAIAN HARGA SATUAN
59 Pressure Reducing Valve dia. 6 " Rp 17,800,000 set
60 AAV Rp 1,400,000 bh
61 HEAD SPRINKLER Rp 120,000 bh
62 PIPA BSP SCH.40 Dia. 3/4” - Spindo Rp 28,680 m¹
63 PIPA BSP SCH.40 Dia. 1” - Spindo Rp 42,600 m¹
64 PIPA BSP SCH.40 Dia. 1 1/2” - Spindo Rp 72,600 m¹
65 PIPA BSP SCH.40 Dia. 1 1/4” - Spindo Rp 57,840 m¹
66 PIPA BSP SCH.40 Dia. 2” - Spindo Rp 92,040 m¹
67 PIPA BSP SCH. 40 Dia. 2 1/2” - Spindo Rp 148,200 m¹
68 PIPA BSP SCH. 40 Dia. 3” - Spindo Rp 192,000 m¹
69 PIPA BSP SCH.40 Dia. 4” - Spindo Rp 276,000 m¹
70 PIPA BSP SCH.40 Dia. 5” - Spindo Rp 384,000 m¹
71 PIPA BSP SCH. Dia. 6” - Spindo Rp 476,400 m¹
72 PIPA BSP SCH.40 Dia. 8” - Spindo Rp 781,200 m¹

D. PEKERJAAN PLUMBING
1 Package Booster Pump, Kapasitas : 2x150 Lpm x 10 M Rp 55,000,000 set
2 Submersible Sumpit Pump, Kapasitas : 2 x 150 l/min x 20 M Rp 12,500,000 unit
3 Roof Tank, FRP Selinder, kapasitas : 2000 liter Rp 6,500,000 unit
4 Roof Tank, GRP Modul Sistem kapasitas : 10 M3 (Efektive) Rp 32,750,000 unit
5 Roof Tank, GRP Modul Sistem kapasitas : 14 M3 (Efektive) Rp 41,500,000 unit
6 TANKI AIR BERSIH BAKU 120 M3 ( PRV Modul Panel ) Rp 97,500,000 unit
7 TANKI AIR BERSIH BAKU 250 M3 ( PRV Modul Panel ) Rp 135,500,000 unit
8 TANKI AIR 500 Liter Rp 3,500,000 unit
9 Dudukan Roof Tank Rp 3,500,000 unit
10 Ground Reservoir, kapasitas :80 M3 Rp 25,000,000 unit
11 Sand Filter (22-30 M3/Jam)-(366-500 LPm) dia.1200 x 1200 mm Rp 15,000,000 unit
12 Carbon Filter (22-30 M3 / Jam)-(366-500 Lpm) dia.1200 x 1200 mm Rp 15,000,000 unit
13 Pompa Filter kapasitas ; 150 Lpm Rp 65,500,000 Unit
14 Pekerjaan Pompa Transfer Air Bersih kap. 150 Lpm / Head,. 60 Meter - Wilo Rp 32,500,000 Unit
15 Panel kontrol Pompa AB Rp 12,500,000 set
16 Elektrik Water Heater Rp 4,500,000 unit
17 Ploating valve dia 40 mm Rp 1,200,000 bh
18 Ploating valve dia 50 mm Rp 2,500,000 bh
19 Ploating valve dia 100 mm Rp 6,500,000 bh
20 Saringan Foot valve dia. 65 mm Rp 350,000 bh
21 Saringan Foot valve dia. 150 mm Rp 750,000 bh
22 Pressure Switch Rp 850,000 bh
23 Pressure Switch dia 50 mm Rp 750,000 bh
24 Pressure gauge Rp 550,000 bh
25 Strainer Rp 3,325,000 bh
26 Water Level Control ( WLC ) Rp 2,500,000 Set
27 Flow Switch Rp 750,000 bh
28 Screen dengan lobang 10 mm Rp 1,250,000 bh
29 Electric Water Heater kapasitas 50 liter,lengkap Instasi Rp 3,100,000 bh
30 Electric Water Heater kapasitas 30 liter,lengkap Instasi Rp 2,300,000 bh
31 Electric Water Heater kapasitas 80 liter,lengkap Instasi Rp 4,200,000 bh
32 Heat Pump Water Heater, kap. 43 kW Rp 3,000,000 unit
33 Pompa Sirkulasi Heat Pump, kap. 10 M3/h - Head. 22,8 m Rp 3,500,000 unit
34 Pompa Return, kap. 3,1 M3/h - Head. 20,61 m Rp 2,750,000 unit
35 Tanki Air Panas 1000 Liter unit
36 Panel kontrol & Instalasi Heat Pump & Pompa unit
37 Tanki RO 2000 Liter unit
38 Pompa RO unit
39 Mesin RO unit
40 Filter RO unit
41 Blower Scruber untuk Lemar unit
42 Submersible Pump (POMPA CELUP SATELIT TANAM 1/2 HP 0.5 HP 3" SHIMIZU SP315K 50-55 METER) Rp 3,500,000 unit
43 Krant Taman Rp 250,000 unit
44 Portable Grease Trap kap. 50 Liter Rp 1,000,000 unit
45 STP Biotech 60 M3 Rp 230,500,000 unit
46 GATE VALVE DIA.15 MM /125 - Yuta Rp 450,000 bh
47 GATE VALVE DIA.20 MM /125 - Yuta Rp 650,000 bh
48 GATE VALVE DIA.25 MM / 125 - Yuta Rp 750,000 bh

Bahan MEP - page 128 of 209


NO URAIAN HARGA SATUAN
49 GATE VALVE DIA.32 MM / 125 - Yuta Rp 1,100,000 bh
50 GATE VALVE DIA.40 MM / 125 - Yuta Rp 1,350,000 bh
51 GATE VALVE DIA.50 MM / 125 - Yuta Rp 1,500,000 bh
52 GATE VALVE DIA.65 MM / 125 - Yuta Rp 1,650,000 bh
53 GATE VALVE DIA.80 MM / 125 - Yuta Rp 1,900,000 bh
54 GATE VALVE DIA.100 MM / 125 - Yuta Rp 3,600,000 bh
55 GATE VALVE DIA.125 MM / 125 Rp 5,000,000 bh
56 GATE VALVE DIA.150 MM / 125 Rp 6,200,000 bh
57 BALL VALVE DIA. 80 MM Rp 650,000 bh
58 BALL VALVE DIA. 50 MM Rp 425,000 bh
59 BALL VALVE DIA. 32 MM Rp 325,000 bh
60 BALL VALVE DIA. 25 MM Rp 265,000 bh
61 BALL VALVE DIA. 20 MM Rp 185,000 bh
62 BALL VALVE DIA. 15 MM Rp 130,000 bh
63 DIFFERENTIAL VALVE Rp 45,500,000 bh
64 BUTTERFLY VALVE 300 MM Rp 10,545,000 bh
65 FLEXIBLE JOINT DIA.100 MM/ 10 KG Rp 4,500,000 bh
66 FLEXIBLE JOINT DIA.80 MM/ 10 KG Rp 3,950,000 bh
67 FLEXIBLE JOINT DIA.65 MM/ 10 KG Rp 3,750,000 bh
68 FLEXIBLE JOINT DIA.50 MM/ 10 KG Rp 3,500,000 bh
69 FLEXIBLE JOINT DIA.40 MM/ 10 KG Rp 3,000,000 bh
70 FLEXIBLE JOINT DIA.32 MM/ 10 KG Rp 2,500,000 bh
71 STRAINER DIA.100 MM Rp 2,450,000 bh
72 STRAINER DIA.80 MM Rp 1,375,000 bh
73 STRAINER DIA.65 MM Rp 1,182,000 bh
74 STRAINER DIA.50 MM Rp 977,900 bh
75 STRAINER DIA.40 MM Rp 825,000 bh
76 STRAINER DIA.32 MM Rp 590,000 bh
77 CHECK VALVE DIA. 100 MM Rp 1,250,000 bh
78 CHECK VALVE DIA. 80 MM Rp 975,000 bh
79 CHECK VALVE DIA. 65 MM Rp 850,000 bh
80 CHECK VALVE DIA. 50 MM Rp 650,000 bh
81 CHECK VALVE DIA. 32 MM Rp 320,000 bh
82 CHECK VALVE DIA. 20 MM Rp 221,000 bh
83 Clean Out dia. 50 mm Rp 155,000 bh
84 Clean Out dia. 65 mm Rp 170,000 bh
85 Clean Out dia. 80 mm Rp 220,000 bh
86 Clean Out dia. 100 mm Rp 260,000 bh
87 Clean Out dia. 150 mm Rp 445,000 bh
88 Clean Out dia. 200 mm Rp 570,000 bh
89 Roof Drain diameter 150 mm Rp 550,000 bh
90 Roof Drain diameter 100 mm Rp 450,000 bh
91 Roof Drain diameter 80 mm Rp 395,000 bh
92 Roof Drain diameter 50 mm Rp 320,000 bh
93 Roof Drain diameter 65 mm Rp 295,000 bh
94 Sumur resapan dia. 120 cm kedalaman 300 cm Rp 3,500,000 unit
95 Bak Kontrol Rp 450,000 unit
96 PIPA PVC AW Dia. 1/2” - Wavin Rp 5,500 m¹
97 PIPA PVC AW dia. 3/4” - Wavin Rp 8,200 m¹
98 PIPA PVC AW Dia. 1” - Wavin Rp 10,200 m¹
99 PIPA PVC AW Dia. 1 1/4” - Wavin Rp 17,500 m¹
100 PIPA PVC AW Dia. 1 1/2” - Wavin Rp 18,500 m¹
101 PIPA PVC AW Dia. 2” - Wavin Rp 23,900 m¹
102 PIPA PVC AW Dia. 2 1/2” - Wavin Rp 37,900 m¹
103 PIPA PVC AW Dia. 3” - Wavin Rp 48,500 m¹
104 PIPA PVC AW Dia. 4” - Wavin Rp 77,800 m¹
105 PIPA PVC AW Dia. 5” - Wavin Rp 122,500 m¹
106 PIPA PVC AW Dia. 6” - Wavin Rp 155,000 m¹
107 PIPA PVC AW Dia. 8” - Wavin Rp 365,000 m¹
108 PIPA PVC AW Dia. 10” - Wavin Rp 525,000 m¹
109 PIPA PVC kls. D Dia. 2” - Wavin Rp 21,510 m¹
110 PIPA PVC kls. D Dia. 1 1/4” - Wavin Rp 15,750 m¹
111 PIPA PVC kls. D Dia. 4” - Wavin Rp 70,020 m¹
112 PIPA PVC kls. D Dia. 6” - Wavin Rp 139,500 m¹

Bahan MEP - page 129 of 209


NO URAIAN HARGA SATUAN
113 PIPA PVC kls. D Dia. 8” - Wavin Rp 328,500 m¹
114 PIPA PVC kls. D Dia. 10” - Wavin Rp 472,500 m¹
115 PIPA PVC kls. D Dia. 12” - Wavin Rp 567,000 m¹
116 SEPTIK TANK BIOLOGICAL SISTEM KAP. 6 M3/day - BioHOME Rp 27,500,000 unit
117 SEPTIK TANK BIOLOGICAL SISTEM KAP. 1,2 M3/day - BioHOME Rp 4,500,000 unit
117 Material untuk Bak kontrol Rp 750,000 unit
118 BAK NETRALISASI - Coral Rp 500,000 unit
119 BAK NETRALISASI KAP. 2 M3 - Coral Rp 12,500,000 unit
119 BAK KOLAM UJI KAP. 4 M3 Rp 7,500,000 unit
120 Grease Trap 30 Liter - IGT 30 Rp 3,750,000 unit
121 Vent Cap PVC 2 " Rp 350,000 bh

E. PIPA AIR BERSIH


1 PPR PN-10 Ø 10 mm - Westpex Rp 10,100 m¹
2 PPR PN-10 Ø 15 mm - Westpex Rp 11,500 m¹
3 PPR PN-10 Ø 20 mm - Westpex Rp 15,000 m¹
4 PPR PN-10 Ø 25 mm - Westpex Rp 23,800 m¹
5 PPR PN-10 Ø 32 mm - Westpex Rp 37,500 m¹
6 PPR PN-10 Ø 40 mm - Westpex Rp 57,500 m¹
7 PPR PN-10 Ø 50 mm - Westpex Rp 90,000 m¹
8 PPR PN-10 Ø 63 mm - Westpex Rp 127,500 m¹
9 PPR PN-10 Ø 80 mm - Westpex Rp 187,500 m¹
10 PPR PN-10 Ø 100 mm - Westpex Rp 275,000 m¹
11 PPR PN-10 Ø 125 mm - Westpex Rp 575,000 m¹
12 PPR PN-10 Ø 150 mm - Westpex Rp 625,000 m¹
12 PPR PN-20 Ø 15 mm - Westpex Rp 15,500 m¹
13 PPR PN-20 Ø 20 mm - Westpex Rp 23,800 m¹
14 PPR PN-20 Ø 25 mm - Westpex Rp 38,800 m¹
15 PPR PN-20 Ø 32 mm - Westpex Rp 60,000 m¹
16 PPR PN-20 Ø 40 mm - Westpex Rp 92,500 m¹
17 PPR PN-20 Ø 50 mm - Westpex Rp 147,500 m¹
18 PPR PN-20 Ø 65 mm - Westpex Rp 215,000 m¹
19 PPR PN-20 Ø 80 mm - Westpex Rp 300,000 m¹
20 PPR PN-20 Ø 100 mm - Westpex Rp 450,000 m¹
21 Pipa Drain PVC berisolasi Rp 15,300 m¹
22 Pipa Header diameter 100 mm Rp 950,000 unit
23 Pipa Header diameter 200 mm Rp 1,750,000 unit
24 Pipa Header diameter 250 mm Rp 2,100,000 unit
25 Pipa Galvanis Iron Pipe GIP klas medium B dia. 50 mm m¹
26 Pipa Galvanis Iron Pipe GIP klas medium B dia. 65 mm m¹
27 Flow Meter Rp 2,100,000 m¹
28 Meter Air dia. 32 mm Kuningan + Valve dia. 32 mm Rp 250,000 set
29 Pipa SS 304 Sch.10 Diameter 1" ( 25 mm ) Rp 92,800 m¹
30 Pipa SS 304 Sch.10 Diameter 1 1/4" ( 32 mm ) Rp 125,000 m¹
31 Pipa SS 304 Sch.10 Diameter 1 1/2" ( 40 mm ) Rp 140,000 m¹
32 Pipa SS 304 Sch.10 Diameter 2" ( 50 mm ) Rp 180,000 m¹
33 Tanki RO 1000 Liter unit
34 Pompa RO unit
35 Mesin RO unit
36 Filter RO unit

F. INSTALASI MEDICAL GAS


1 Medical Gas Manifold Oxigen (O), 2x 10 Cyl. Rp 133,858,800 unit
2 Medical Gas Vacuum Pump System ( V ) 2 x 3,7 kW Rp 250,000,000 Unit
3 Medical Gas Manifold Nitrous Oxside (N), 2x2 Cyl. Rp - Unit
4 Medical Gas Compressed Air system (A), 2x7.5 kW Rp 306,800,000 Unit
5 Wall Outlet Oxygen (O), pin index, push type Rp - unit
6 Wall Outlet Vacuum (V), pin index, push type, slide base Rp - unit
7 Wall Outlet Compressed Air 4 Bar (A4), pin index, push type Rp - unit
8 Wall Outlet Nitrous Oxide (N), pin index, push type Rp - unit
9 Pigtail Rp 750,000 bh
10 Gate Valve type K Lead Copper Tube Rp 1,500,000 bh
11 Ball Valve 1/2" Rp 3,500,000 bh
12 Ball Valve 1" Rp 3,000,000 bh
Bahan MEP - page 130 of 209
NO URAIAN HARGA SATUAN
13 Zona Valve 1 Gas (O) Rp 7,500,000 set
14 Zone Valve 2 Gas Rp 10,500,000 set
15 Zone Valve 3 Gas Rp 14,917,500 set
16 Zona Valve 4 Gas (O, N, A, V) Rp 17,500,000 set
17 Area Alarm 4 Gas (O, N, A, V) Rp 24,288,750 set
18 Area Alarm 3 Gas (O, N, A) Rp 18,207,000 set
19 Area Alarm 2 Gas (O,V) Rp 12,750,000 set
20 Area Alarm 1 Gas (O) Rp 9,750,000 set
21 Head Bed pabrikan ukuran 1200 x 800 x 220mm Rp 2,550,000 unit
22 Pipa Tembaga ASTM B 819 Type L
23 Diameter 3/4" Rp 190,800 m¹
24 Diameter 7/8" Rp 238,500 m¹
25 Diameter 5/8" Rp 150,300 m¹
26 Diameter 3/8" Rp 66,150 m¹
27 Diameter 1/2" Rp 105,300 m¹
28 Diameter 1 " Rp 293,400 m¹
29 Diameter 1 1/4" Rp 316,800 m¹
30 Diameter 1 1/2" Rp 328,500 m¹
31 Diameter 1 1/8" Rp 328,500 m¹
32 Diameter 1 3/8" Rp 310,500 m¹
33 Diameter 1 5/8" Rp 375,000 m¹
34 Diameter 2 1/8" Rp 635,000 m¹
35 Anesthetic Gas Scavenging System (AGSS) Rp 23,500,000 unit

G. PEKERJAAN ELEKTRIKAL
1 Cubicle Incoming CB Rp 47,500,000 bh
2 Cubicle Metering Rp 85,500,000 bh
3 Cubicle Outgoing CB Rp 50,600,000 bh
4 Cubicle Arester Rp 22,300,000 bh
5 Transformator Kering Type 1000 kVA, 20 kV - 400 Volt Rp 110,500,000 unit
6 Pentanahan Neutral pada Ruang Panel, dll Rp 3,500,000 unit
7 UPS (Back Up Time 15 Menit ) kap. 10 Kva Rp 76,500,000 unit
8 UPS (Back Up Time 15 Menit ) kap. 20 Kva Rp 105,600,000 unit
9 UPS (Back Up Time 15 Menit ) kap. 90 Kva Rp 350,000,000 unit
10 UPS, kapasitas 10 Kva / Back Up time 15 Menit + Trafo isolasi medis Rp 85,500,000 unit
11 Capasitor 300 kVAR Rp 89,500,000 unit
12 Capasitor 450 kVAR Rp 95,400,000 unit
13 Kabel FRC 3x4 mm2 - Jembo Rp 56,326 m¹
14 Kabel FRC 4x4 mm2 - Jembo Rp 71,820 m¹
15 Kabel FRC 4x10 mm2 - Jembo Rp 138,510 m¹
16 Kabel FRC 4x16 mm2 - Jembo Rp 194,484 m¹
17 Kabel FRC 4x 25 mm2 - Jembo Rp 275,500 m¹
18 Kabel FRC 4x 35 mm2 - Jembo Rp 399,684 m¹
19 Kabel FRC 4x 50 mm2 - Jembo Rp 487,464 m¹
20 Kabel FRC 4x120 mm2 - Jembo Rp 1,425,000 m¹
21 Kabel FRC 4x150 mm2 - Jembo Rp 1,662,500 m¹
22 Kabel FRC 4x185 mm2 - Jembo Rp 1,995,000 m¹
23 Kabel N2XSEBY 3 (1x120 mm2) - Jembo Rp - m¹
24 Kabel N2XSY 3 (1 x 120 mm2) - Jembo Rp - m¹
25 Kabel NYFGbY 4 x 10 mm2 - Jembo Rp 128,250 m¹
26 Kabel NYFGbY 4 x 25 mm2 - Jembo Rp 261,250 m¹
27 Kabel NYFGbY 4 x 50 mm2 - Jembo Rp 1,282,500 m¹
28 Kabel NYFGbY 4x150 mm2 - Jembo Rp 1,282,500 m¹
29 Kabel NYFGbY 4x185 mm2 - Jembo Rp 1,615,000 m¹
30 Kabel NYFGbY 4x240 mm2 - Jembo Rp 2,090,000 m¹
31 Kabel NYFGbY 4x300 mm2 - Jembo Rp 2,565,000 m¹
32 Kabel NYA 1x1,5 mm2 - Jembo Rp 2,679 m¹
33 Kabel NYA 1x 50 mm2 - Jembo Rp 301,800 m¹
34 Kabel NYA 1x 16 mm2 - Jembo Rp 34,200 m¹
35 Kabel NYA 1x 6 mm2 - Jembo Rp 11,420 m¹
36 Kabel NYMHY 3x2,5 mm2 - Jembo Rp 18,500 m¹
36 Kabel NYM 2x1,5 mm2 - Jembo Rp 10,500 m¹
37 Kabel NYM 3x2,5 mm2 - Jembo Rp 19,000 m¹
38 Kabel NYY 1x150 mm2 - Jembo Rp 302,700 m¹

Bahan MEP - page 131 of 209


NO URAIAN HARGA SATUAN
39 Kabel NYY 1x185 mm2 - Jembo Rp 377,100 m¹
40 Kabel NYY 1x240 mm2 - Jembo Rp 495,300 m¹
41 Kabel NYY 1x300 mm2 - Jembo Rp 618,900 m¹
42 Kabel NYY 3x25 mm2 - Jembo Rp 174,900 m¹
43 Kabel, NYY 3 x 2,5 mm2 - Jembo Rp 23,000 m¹
44 Kabel NYY 4x10 mm2 - Jembo Rp 90,400 m¹
45 Kabel NYY 4x16 mm2 - Jembo Rp 148,200 m¹
46 Kabel NYY 4x25 mm2 - Jembo Rp 228,000 m¹
47 Kabel NYY 4 x 35 mm2 - Jembo Rp 310,500 m¹
48 Kabel, NYY 4 x 2,5 mm2 - Jembo Rp 26,720 m¹
49 Kabel NYY 4x4 mm2 - Jembo Rp 40,460 m¹
50 Kabel NYY 4x50 mm2 - Jembo Rp 412,200 m¹
51 Kabel NYY 3x50 mm2 - Jembo Rp 305,700 m¹
52 Kabel NYY 3x35 mm2 - Jembo Rp 235,500 m¹
53 Kabel NYY 4x6 mm2 - Jembo Rp 56,670 m¹
54 Kabel NYY 4x70 mm2 - Jembo Rp 584,700 m¹
55 Kabel NYY 4x95 mm2 - Jembo Rp 805,200 m¹
56 Kabel NYY 4x120 mm2 - Jembo Rp 1,011,900 m¹
57 Kabel NYY 4x150 mm2 - Jembo Rp 1,245,000 m¹
58 Kabel NYY 4x185 mm2 - Jembo Rp 1,552,800 m¹
59 Kabel NYY 4x240 mm2 - Jembo Rp 2,044,800 m¹
60 Kabel NYY 1 x 300 mm2 - Jembo Rp 618,900 m¹
61 Kabel NYY 1 x 240 mm2 - Jembo Rp 495,300 m¹
62 Kabel NYY 1 x 185 mm2 - Jembo Rp 377,100 m¹
63 BC 240 mm - Jembo m¹
64 BC 120 mm - Jembo Rp 207,200 m¹
65 BC 95 mm - Jembo Rp 156,700 m¹
66 BC 70 mm - Jembo Rp 113,500 m¹
67 BC 50 mm - Jembo Rp 79,800 m¹
68 BC 35 mm - Jembo Rp 57,200 m¹
69 BC 25 mm - Jembo Rp 42,100 m¹
70 BC 16 mm - Jembo Rp 26,600 m¹
71 BC 10 mm - Jembo Rp 16,800 m¹
72 BC 6 mm - Jembo Rp 10,100 m¹
73 BCC 4 mm Rp 8,500 m¹
74 BCC 2,5 mm Rp 7,500 m¹
75 BARS CU 25 x 5 Rp 1,425,000 m'
76 Kabel Tray lebar 20 cm (200 -100) Rp 275,000 m¹
77 Kabel Tray lebar 30 cm (300 -100) Rp 425,000 m¹
78 Kabel Tray lebar 40 cm (400 -100) Rp 508,000 m¹
79 Kabel Tray lebar 60 cm (600 -100) Rp 570,000 m¹
80 Kabel Tray lebar 80 cm (800 -100) Rp 635,000 m¹
81 Galian & Urugan Rp 45,000 m¹
82 Cover Glass Rp 78,000 bh
83 Lampu LED Panel 120/60 W - Opple Rp 1,020,000 bh
84 Lampu LED Panel 60/40 W - Opple Rp 588,000 bh
85 Lampu Down Light LED 17 W - Opple Rp 300,000 bh
86 Lampu Down Light LED 12 W - Opple Rp 150,000 bh
87 Lampu Down Light LED 8 W - Opple Rp 144,000 bh
88 Lampu Down Light LED 6 W - Opple Rp 120,000 bh
89 Lampu DL Spot LED 15 W - Opple Rp 234,000 bh
90 Lampu Exit 3W - Opple Rp 180,000 bh
91 Lampu Dinding LED 5 W + Saklar Rp 300,000 bh
92 Lampu Indirect 3 W / M Rp 102,000 bh
93 Lampu TL LED 1x16 W/TKI - Opple Rp 188,400 bh
94 Lampu TL LED 1x16 W/BL / Water Proof - Opple Rp 222,000 bh
95 Lampu TL LED 1x8 W/ Cove (RMO) - Opple Rp 210,000 bh
96 Lampu TL LED 1x8 W/ Cove Wastafel - Opple Rp 180,000 bh
97 Lampu TL LED 2x16 W/Acrilic Prismtaic Rp 354,000 bh
98 Lampu TL LED 2x16 W/Louvre M6 Rp 318,000 bh
99 Lampu TL LED 16W / TBS Menempel pada plat beton Rp 300,000 bh
100 Lampu Taman + tiang Rp 3,540,000 bh
101 Lampu Jalan PJU LED 1 X 50 Watt lengkap tiang - Opple Rp 4,500,000 bh
102 Lampu Jalan PJU LED 2 X 50 Watt lengkap tiang - Opple Rp 5,400,000 bh

Bahan MEP - page 132 of 209


NO URAIAN HARGA SATUAN
103 Tiang PJU 7 meter Rp 3,600,000 bh
104 Lampu LED Strip 3 Watt/ Meter Rp 180,000 m'
105 Lampu SOROT 25 W - Opple Rp 1,800,000 m'
106 Battere Emergency backup 3 jam Rp 120,000 bh
107 Saklar ganda 10 A - Legrand Rp 65,000 bh
108 Saklar group 4 modul - Legrand Rp 62,000 bh
109 Saklar group 6 modul - Legrand Rp 75,000 bh
110 Saklar group 8 modul - Legrand Rp 120,000 bh
111 Saklar group 12 modul - Legrand Rp 185,000 bh
112 Saklar hotel 10 A - Legrand Rp 80,000 bh
113 Saklar tunggal 10 A - Legrand Rp 50,000 bh
114 Stop kontak daya 10/16 A - Legrand Rp 75,000 bh
115 Stop kontak daya 2 x 10/16 A - Legrand Rp 55,000 bh
116 Stop kontak daya 3 x 10/16 A - Legrand Rp 65,000 bh
117 Stop kontak daya 4 x 10/16 A - Legrand Rp 85,000 bh
118 Stop kontak daya 6 x 10/16 A - Legrand Rp 110,000 bh
119 Stop kontak daya 10/16 A - 3 Phase - Legrand Rp 115,000 bh
120 Stop kontak daya lantai 2 x @200 W/16A - Legrand Rp 750,000 bh
121 Stop kontak daya lantai 3 x @200 W/16A - Legrand Rp 950,000 bh
122 Box Floor Outlet + ( 2 BUAH STOP KONTAK ) Rp 800,000 bh
123 Socket Pipa Boss Rp 3,500 bh
124 Tee Doos Boss Rp 7,500 bh
125 Pipa Conduit Boss Rp 15,000 batang
126 Las Doop Boss Rp 5,000 bh
127 Klem Pipa Boss Rp 1,500 bh
128 Isolasi ban Boss Rp 3,000 bh
129 Fhiser Boss Rp 500 bh
130 MCB 6 A/1 Phasa LS Rp 45,000 bh
131 MCB 10 A/1 Phasa LS Rp 45,000 bh
132 MCB 16 A/1 Phasa LS Rp 45,000 bh
133 MCB 6 A/3 Phasa LS Rp 175,000 bh
134 MCB 10 A/3 Phasa LS Rp 175,000 bh
135 MCB 16 A/3 Phasa LS Rp 175,000 bh
136 MCB 20 A/3 Phasa LS Rp 175,000 bh
137 MCB 25 A/3 Phasa LS Rp 190,000 bh
138 MCB 32 A/3 Phasa LS Rp 210,000 bh
139 MCB 40 A/3 Phasa LS Rp 210,000 bh
140 MCB 50 A/3 Phasa LS Rp 395,000 bh
141 MCCB 125 A/3 Phasa LS Rp 375,000 bh
142 MCCB 140/160 A/3 Phasa LS Rp 735,000 bh
143 MCCB 32 A/3 Phasa LS Rp 325,000 bh
144 MCCB 63 A/3 Phasa LS Rp 365,000 bh
145 MCCB 50 A/3 Phasa LS Rp 365,000 bh
146 MCCB 40 A/3 Phasa LS Rp 365,000 bh
147 MCCB 1000-1250 A/3 Phasa LS Rp 10,500,000 bh
148 MCCB 400-1000 A/3 Phasa LS Rp 7,500,000 bh
149 MCCB 630-800 A/3 Phasa LS Rp 7,350,000 bh
150 MCCB 400-630 A/3 Phasa LS Rp 6,570,000 bh
151 MCCB 350-500 A/3 Phasa LS Rp 5,600,000 bh
152 MCCB 300-400 A/3 Phasa LS Rp 2,130,000 bh
153 MCCB 250-350 A/3 Phasa LS Rp 2,130,000 bh
154 MCCB 175-250 A/3 Phasa LS Rp 2,070,000 bh
155 MCCB 140-200 A/3 Phasa LS Rp 2,070,000 bh
156 MCCB 125-160 A/3 Phasa LS Rp 2,070,000 bh
157 MCCB 100-125 A/3 Phasa LS Rp 1,970,000 bh
158 MCCB 80-100 A/3 Phasa LS Rp 750,000 bh
159 MCCB 63-80 A/3 Phasa LS Rp 360,000 bh
160 MCCB 20-25 A/3 Phasa LS Rp 360,000 bh
161 ELCB 6 A/3 Phasa LS Rp 350,000 bh
162 ACB 1000 A LS Rp 14,500,000 bh
163 ACB 1250 A LS Rp 14,800,000 bh
164 ACB 1600 A LS Rp 16,500,000 bh
165 ACB 2000 A LS Rp 18,900,000 bh
166 ACB 2500 A LS Rp 24,500,000 bh

Bahan MEP - page 133 of 209


NO URAIAN HARGA SATUAN
167 Digital Meter SocomecRp 6,900,000 bh
168 Ampere Meter 800/5A EC 96 SocomecRp 300,000 bh
169 Fuse & Indicator SocomecRp 25,000 bh
170 Selector Switch M-O-A 2P SocomecRp 120,000 bh
171 Volt Meter 0-500V EC 96 SocomecRp 350,000 bh
172 Timer switch SocomecRp 200,000 bh
173 Pilot Lamp SocomecRp 85,000 bh
174 Arresster SocomecRp 450,000 bh
175 Contactor 350 SocomecRp 250,000 unit
176 CT 2500/5 SocomecRp 1,350,000 unit
177 CT 80/5 SocomecRp 125,000 unit
178 ACTS / Solenoid 1600A Enos Rp 125,500,000 unit
179 ATS / Solenoid 1600A Enos unit
180 Contactor 1250 Socomec Rp 12,500,000 unit
181 Contactor 6A / 1 phase Socomec Rp 150,000 unit
182 Contactor 50A 3P Socomec Rp 1,250,000 unit
183 Contactor 25A 3P Socomec Rp 325,000 unit
184 Contactor 250A 3P Socomec Rp 2,100,000 unit
185 Contactor 120A 3P Socomec Rp 1,750,000 unit
186 Contactor 500A Socomec Rp 17,500,000 unit
187 Contactor 800A Socomec Rp 23,500,000 unit
188 Shun trip Socomec Rp 800,000 unit
189 Way delta A Socomec Rp - bh
190 Way delta B Socomec Rp - bh
191 DOL Starter Socomec Rp 450,000 bh
192 Interlock Socomec Rp 7,500,000 unit
193 Trafo isolasi 15-20 Kva Socomec Rp 145,000,000 unit
194 Mechanic Motor Interlock Socomec Rp 7,500,000 Set
195 Box Panel ( 120 x 100 x 30 ) cm Prastiwahyu
Rp (Panel
7,500,000
Maker) bh
196 Box Panel ( 80 x 60 x 30 ) cm Prastiwahyu
Rp (Panel
4,850,000
Maker) bh
197 Box Panel ( 60 x 60 x 20 ) cm Prastiwahyu
Rp (Panel
3,950,000
Maker) bh
198 Box Panel ( 40 x 30 x 20 ) cm Prastiwahyu
Rp (Panel
3,100,000
Maker) bh
199 Box Panel ( 30 x 20 x 15 ) cm Prastiwahyu
Rp (Panel
1,500,000
Maker) bh
200 Grounding BC 120 mm2 Rp 1,243,200 LS
201 Grounding BC 50 mm2 Rp 478,800 LS
202 Grounding BC 35 mm2 Rp 343,200 LS
203 Grounding BC 25 mm2 Rp 252,600 LS
204 Grounding BC 16 mm2 Rp 159,600 LS
205 Grounding BC 6-10 mm2 Rp 100,800 LS
206 Panel LP-PL unit
207 Obstraction Lamp bh
208 Premium Capasitor 40kVAR/3p/400V/50Hz/In = 1,7 bh
209 Capasitor Regulator, 25 kVAR (12 step) bh
210 Harmonic Filter Reactor 50kVAR bh
211 Exhaust Fan 800 cfm, industrial type bh
212 Busbar Tembaga SolidStandard NEMA (300x100x10) bh
213 Bak kontrol bh

214 UPS 5 kVA / 1 Phase / Backup Time 30 Menit unit


215 UPS 10 kVA / 1 Phase / Backup Time 30 Menit unit

H. PENANGKAL PETIR
1 Air Terminal - Radiuas 100 M Rp 17,500,000 unit
2 Obstraction Lamp Rp 3,250,000 bh
3 NYA 1 x 70 mm2 Rp 295,000 m¹
4 Connecting Sleeve lengkap surge arester Rp 5,800,000 Set
5 Lightening Flash counter Rp 10,500,000 Set
6 Grounding sistem Rp 4,500,000 Set
- Copper road
- Pentanahan & pipa GIP dia. 1 1/2 "
- Bak kontrol ( 40x40) cm lengkap tutup
- Kawat BCC dia. 70 mm
7 Obstruction Lamp Rp 3,500,000 bh

Bahan MEP - page 134 of 209


NO URAIAN HARGA SATUAN
8 Testing/pengukuran pentanahan Rp 1,500,000 titik
9 Tiang / Menara - dududkan EF Rp 2,500,000 unit

P. GENSET
1 Unit Genset (Silent) , Kapasitas : 1000 KVA unit
2 Panel Control AMF unit
3 Pemindahan genset ke Pondasi unit
4 Storage Tank, Kapasitas : 15000 Liter unit
5 Daily tank, Kapasitas : 500 Liter unit
6 Electric Transfer Pump 30 lpm / Gear Pump unit
7 Hand Pump 15 lpm unit
8 Pemipaan bahan bakar pipa BSP Sch 40 Ls
9 Residential Silencer unit
10 Radiator Ducting dan Flexible connection unit
11 Intake Attenuator unit
12 Discharge Attenuator unit
13 Peredam Ruangan Genset m2
14 Grounding body genset Ls
15 Melapis ruang genset dengan rockwool density
16 80 KG/M3, tebal 2", glas clot dan kawat ayam
17 Testing Commisioning termasuk penyediaan solar 10 000 liter Ls

Q. LIFT
Elevator ( BED ELEVATOR ) 1 BUKAAN unit
Jenis : Hospital Bed Elevator
Kapasitas : 1600 Kg
Kecepatan : 60 MpM
Lintasan : 2 lantai / 2 stop

Elevator ( BED ELEVATOR ) 2 BUKAAN Unit


Jenis : Service Elevator
Jenis : Hospital Bed Elevator
Kapasitas : 1600 Kg
Kecepatan : 60 MpM
Lintasan : 2 lantai / 4 stop

Dumb Waiter Unit


Jenis : Lift Barang
Kapasitas : 200 Kg
Kecepatan : 60 MpM
Lintasan : 2 lantai / 2 stop

R. PEUNUMATIC TUBES
1 Central Control Unit Dual Line System and Power Supply Unit Rp 75,000,000 set
2 Blower incl. assesories Rp 282,600,000 set
Blower 3-Phase
Blower Connecting Set
Blower Mounting Buffer
Blower Sound Absorber
Blower Controller
Air/Transfer Diverter
Bypass
Hose Clamp 50-70
Air Hose
Air Lid
Air Bow
Reduction Air Diverter
Connecting Tube
Transfer Bend

3 PC-Monitoring and Programing System RFID, 2-Line System Rp 9,000,000 set


4 3 - Way Diverter Rp 35,400,000 Unit
5 Multy Loading Station, incl. : Basket, Cushion and carrier rack Rp 66,900,000 Unit
Bahan MEP - page 135 of 209
NO URAIAN HARGA SATUAN
6 Hard PVC Grey, dia. 110 mm Rp 300,000 m'
7 Hard PVC transparant, dia. 110 mm Rp 1,560,000 m'
8 Bend R=800, Grey Rp 1,800,000 bh
9 Bend R=800, Transparant Rp 5,100,000 bh
10 Sleeve Rp 150,000 bh
11 Long Carrier with 2xChips Rp 3,900,000 bh
12 Short Carrier with 2xChips Rp 3,300,000 bh
13 Cable 2x2x0.22 + 3x2.5F, Kabel Power Rp 210,000 m'
14 Bottom Loading Station Rp 15,000,000 m'

Bahan MEP - page 136 of 209


ANALISA HARGA SATUAN
PEKERJAAN PEMBANGUNAN RUMAH SAKIT REGIONAL
KELAS C KABUPATEN BONE - TAHAP LANJUTAN
TAHUN ANGGARAN 2023

NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL

PEKERJAAN AIR BERSIH

1 UNIT PEKERJAAN DEEPWELL Rp -


I. JASA PENGEBORAN
A. Persiapan Lapangan
1 Mobilisasi & Demobilisasi Peralatan ls 1.000 Rp -
2 Pembuatan Spull bak / Bak sirkulasi Unit 1.000 Rp -
B. Jasa Kontruksi
1 Jasa Bor pilot hole dia 8" M' 200.000 Rp -
2 Reaming Bor Hole dia. 12" M' 77.000 Rp -
3 Tenaga kerja ( 5 orang x 45 hari ) Hari 225.000 Rp -
4 Solar/olie/bensin/bahan las Ls 1.000 Rp -
5 Air Kerja Ls 1.000 Rp -
6 Buang Lumpur Bor Ls 1.000 Rp -
7 Electrical Logging St 1.000 Rp -
8 Spolling ( Pemberesihan sumur ) Ls 1.000 Rp -
C. Lain - Lain
1 Pumping Test ( 3 hari x 8 jam ) Hari 3.000 Rp -
2 Analisa Air Bersih Set 1.000 Rp -
3 Foto dan Laporan Set 1.000 Rp -
4 Pengadaan & Pemasangan pompa Ls 1.000 Rp -
II. MATERIAL
1 Pompa Deepwell Unit 1.000 Rp -
Kapasitas : 150 ltr/mnt - Head : 100 m
2 Pipa GIP Medium,dia. 6 " M' 72.000 Rp -
3 Pipa GIP Medium,dia. 3 " M' 113.000 Rp -
4 Screen Stainless Steel, dia. 3 " M' 15.000 Rp -
5 Dop dia. 3 " Bh 1.000 Rp -
6 Reducer 6 " x 3 " Pcs 1.000 Rp -
7 Gravel M3 5.000 Rp -
8 Tutup Sumur Pcs 1.000 Rp -
9 Semen Zak 5.000 Rp -
10 Pasir M3 5.000 Rp -
III. ACCESSORIES POMPA
1 Panel dan Accesoriesnya Unit 1.000 Rp -
2 Kabel Power, NYY 3 x 4 mm - dari DW ke Panel M' 100.000 Rp -
3 Kabel WLC, NYMHY 3 x 1,5 mm2 - dari DW ke Panel M' 100.000 Rp -
4 Electroda Pcs 6.000 Rp -
5 Sock / Connector Ls 1.000 Rp -
6 Pipa Hisap GIP Medium dia. 2 " M' 66.000 Rp -
7 Bak Kontrol Unit 1.000 Rp -
8 Accessories Bak Control ( Manometer, Check valve ) Ls 1.000 Rp -
IV. PERIZINAN
1 Izin Sumur dari BPLHD Ls 1.000 Rp -
2 Meter Air 2 " + Tera & segel Ls 1.000 Include Rp -
Jumlah Rp -
Biaya umum dan Keuntungan
Rp 10% -
Total = Jumlah+(Keuntungan+Over
Rp head) 10%-

1 UNIT Pengadaan & Pemasangan Pompa Booster Kap. 2x150 Lpm / Head : 25 M Rp 62,211,000
Harga Unit Pompa Booster bh 1.000 Rp 55,000,000.00 Rp 55,000,000
Alat Bantu bh 1.000 Rp 1,100,000.00 Rp 1,100,000
Upah Pasang :
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Kepala tukang hari 1.000 Rp 155,000.00 Rp 155,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Jumlah Rp 56,555,000
Keuntungan 10% Rp 5,655,500
Total = Jumlah+(Keuntungan 10%) Rp 62,210,500

1 UNIT Pengadaan & Pemasangan TANGKI AIR KAP. 10 M3 Rp 40,706,000


Tanki Air type Panel (kap.10 M3) Unit 1.000 Rp 32,750,000.00 Rp 32,750,000
Dudukan Unit 1.000 Rp 3,500,000.00 Rp 3,500,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Jumlah Rp 37,005,000
Keuntungan 10% Rp 3,700,500
Total = Jumlah+(Keuntungan 10%) Rp 40,705,500

1 UNIT Pengadaan & Pemasangan TANGKI AIR KAP. 14 M3 Rp 50,331,000


Tanki Air type Panel (kap.14 M3) Unit 1.000 Rp 41,500,000.00 Rp 41,500,000
Dudukan Unit 1.000 Rp 3,500,000.00 Rp 3,500,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Jumlah Rp 45,755,000
Keuntungan 10% Rp 4,575,500
Total = Jumlah+(Keuntungan 10%) Rp 50,330,500

1 UNIT Pengadaan & Pemasangan TANGKI AIR KAP. 250 M3 Rp 155,381,000

Analisa Harga Satuan Pekerjaan MEP - page 137 of 215


NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Tanki Air type Panel (kap.250 M3) Unit 1.000 Rp 135,500,000.00 Rp 135,500,000
Dudukan Unit 1.000 Rp 5,000,000.00 Rp 5,000,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Jumlah Rp 141,255,000
Keuntungan 10% Rp 14,125,500
Total = Jumlah+(Keuntungan 10%) Rp 155,380,500

1 UNIT Pengadaan & Pemasangan TANGKI AIR KAP. 2000 Liter Rp 11,831,000
Tanki Air type Panel (kap. 2 M3) Unit 1.000 Rp 6,500,000.00 Rp 6,500,000
Dudukan Unit 1.000 Rp 3,500,000.00 Rp 3,500,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Jumlah Rp 10,755,000
Keuntungan 10% Rp 1,075,500
Total = Jumlah+(Keuntungan 10%) Rp 11,830,500

1 UNIT Pengadaan & Pemasangan POMPA TRANSFER AB kap. 150 Lpm/Head.60 Meter Rp 38,368,000
Pompa Transfer Air Bersih Unit 1.000 Rp 32,500,000.00 Rp 32,500,000
Alat bantu ls 1.000 Rp 1,625,000.00 Rp 1,625,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 34,880,000
Keuntungan 10% Rp 3,488,000
Total = Jumlah+(Keuntungan 10%) Rp 38,368,000

1 UNIT Pengadaan & Pemasangan POMPA FILTER kap. 150 Lpm Rp 76,483,000
Pompa Filter kap. 150 Lpm Unit 1.000 Rp 65,500,000.00 Rp 65,500,000
Alat bantu ls 1.000 Rp 3,275,000.00 Rp 3,275,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 69,530,000
Keuntungan 10% Rp 6,953,000
Total = Jumlah+(Keuntungan 10%) Rp 76,483,000
1 UNIT Pengadaan & Pemasangan SAND FILTER, KAP. 300 Lpm Rp 18,156,000
SAND FILTER. kap. 300 Lpm Unit 1.000 Rp 15,000,000.00 Rp 15,000,000
Alat bantu ls 1.000 Rp 750,000.00 Rp 750,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 16,505,000
Keuntungan 10% Rp 1,650,500
Total = Jumlah+(Keuntungan 10%) Rp 18,155,500
1 UNIT Pengadaan & Pemasangan CARBON FILTER, KAP. 300 Lpm Rp 18,156,000
CARBON FILTER. kap. 300 Lpm Unit 1.000 Rp 15,000,000.00 Rp 15,000,000
Alat bantu ls 1.000 Rp 750,000.00 Rp 750,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 16,505,000
Keuntungan 10% Rp 1,650,500
Total = Jumlah+(Keuntungan 10%) Rp 18,155,500
1 UNIT Pengadaan & Pemasangan Electroda Water Level Control Rp 4,458,000
Electroda Water Level Control bh 1.000 Rp 3,500,000.00 Rp 3,500,000
Alat Bantu bh 1.000 Rp 175,000.00 Rp 175,000
Upah Pasang :
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Kepala tukang hari 1.000 Rp 155,000.00 Rp 155,000
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Jumlah Rp 4,052,500
Keuntungan 10% Rp 405,250
Total = Jumlah+(Keuntungan 10%) Rp 4,457,750

1 UNIT Pengadaan & Pemasangan FLOATING VALVE DIA. 40 MM Rp 1,801,000


FLOATING VALVE DIA. 40 MM bh 1.000 Rp 1,200,000.00 Rp 1,200,000
Alat Bantu bh 1.000 Rp 60,000.00 Rp 60,000
Upah Pasang :
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Kepala tukang hari 1.000 Rp 155,000.00 Rp 155,000
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Jumlah Rp 1,637,500
Keuntungan 10% Rp 163,750
Total = Jumlah+(Keuntungan 10%) Rp 1,801,250

1 UNIT Pengadaan & Pemasangan FLOATING VALVE DIA. 50 MM Rp 3,303,000


FLOATING VALVE DIA. 50 MM bh 1.000 Rp 2,500,000.00 Rp 2,500,000
Alat Bantu bh 1.000 Rp 125,000.00 Rp 125,000
Upah Pasang :
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Kepala tukang hari 1.000 Rp 155,000.00 Rp 155,000
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Jumlah Rp 3,002,500
Keuntungan 10% Rp 300,250
Analisa Harga Satuan Pekerjaan MEP - page 138 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Total = Jumlah+(Keuntungan 10%) Rp 3,302,750

1 UNIT Pengadaan & Pemasangan WATER LEVEL CONTROL Rp 3,303,000


WATER LEVEL CONTROL bh 1.000 Rp 2,500,000.00 Rp 2,500,000
Alat Bantu bh 1.000 Rp 125,000.00 Rp 125,000
Upah Pasang :
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Kepala tukang hari 1.000 Rp 155,000.00 Rp 155,000
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Jumlah Rp 3,002,500
Keuntungan 10% Rp 300,250
Total = Jumlah+(Keuntungan 10%) Rp 3,302,750

1 UNIT Pengadaan & Pemasangan Saringan FOOT VALVE DIA.65 MM Rp 523,000


Saringan FOOT VALVE DIA.65 MM bh 1.000 Rp 350,000.00 Rp 350,000
Alat Bantu bh 1.000 Rp 17,500.00 Rp 17,500
Upah Pasang :
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Kepala tukang hari 0.286 Rp 155,000.00 Rp 44,286
Mandor hari 0.143 Rp 155,000.00 Rp 22,143
Jumlah Rp 475,357
Keuntungan 10% Rp 47,536
Total = Jumlah+(Keuntungan 10%) Rp 522,893

1 UNIT Pengadaan & Pemasangan Saringan FOOT VALVE DIA.150 MM Rp 1,104,000


Saringan FOOT VALVE DIA.150 MM bh 1.000 Rp 750,000.00 Rp 750,000
Alat Bantu bh 1.000 Rp 37,500.00 Rp 37,500
Upah Pasang :
Tukang hari 0.571 Rp 145,000.00 Rp 82,857
Kepala tukang hari 0.571 Rp 155,000.00 Rp 88,571
Mandor hari 0.286 Rp 155,000.00 Rp 44,286
Jumlah Rp 1,003,214
Keuntungan 10% Rp 100,321
Total = Jumlah+(Keuntungan 10%) Rp 1,103,536

1 UNIT Pengadaan & Pemasangan FLEXIBLE JOINT DIA.65 MM' Rp 4,450,000


FLEXIBLE JOINT DIA.65 MM' bh 1.000 Rp 3,750,000.00 Rp 3,750,000
Alat Bantu bh 1.000 Rp 187,500.00 Rp 187,500
Upah Pasang :
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Kepala tukang hari 0.286 Rp 155,000.00 Rp 44,286
Mandor hari 0.143 Rp 155,000.00 Rp 22,143
Jumlah Rp 4,045,357
Keuntungan 10% Rp 404,536
Total = Jumlah+(Keuntungan 10%) Rp 4,449,893

1 UNIT Pengadaan & Pemasangan FLEXIBLE JOINT DIA.50 MM' Rp 4,161,000


FLEXIBLE JOINT DIA.50 MM' bh 1.000 Rp 3,500,000.00 Rp 3,500,000
Alat Bantu bh 1.000 Rp 175,000.00 Rp 175,000
Upah Pasang :
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Kepala tukang hari 0.286 Rp 155,000.00 Rp 44,286
Mandor hari 0.143 Rp 155,000.00 Rp 22,143
Jumlah Rp 3,782,857
Keuntungan 10% Rp 378,286
Total = Jumlah+(Keuntungan 10%) Rp 4,161,143

1 UNIT Pengadaan & Pemasangan FLEXIBLE JOINT DIA.32 MM' Rp 3,006,000


FLEXIBLE JOINT DIA.32 MM' bh 1.000 Rp 2,500,000.00 Rp 2,500,000
Alat Bantu bh 1.000 Rp 125,000.00 Rp 125,000
Upah Pasang :
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Kepala tukang hari 0.286 Rp 155,000.00 Rp 44,286
Mandor hari 0.143 Rp 155,000.00 Rp 22,143
Jumlah Rp 2,732,857
Keuntungan 10% Rp 273,286
Total = Jumlah+(Keuntungan 10%) Rp 3,006,143

1 UNIT Pengadaan & Pemasangan STRAINER DIA.65 MM' Rp 1,484,000


Pengadaan & Pemasangan STRAINER DIA.65 MM' bh 1.000 Rp 1,182,000.00 Rp 1,182,000
Alat Bantu bh 1.000 Rp 59,100.00 Rp 59,100
Upah Pasang :
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Kepala tukang hari 0.286 Rp 155,000.00 Rp 44,286
Mandor hari 0.143 Rp 155,000.00 Rp 22,143
Jumlah Rp 1,348,957
Keuntungan 10% Rp 134,896
Total = Jumlah+(Keuntungan 10%) Rp 1,483,853

1 UNIT Pengadaan & Pemasangan STRAINER DIA.50 MM' Rp 1,248,000


Pengadaan & Pemasangan STRAINER DIA.50 MM' bh 1.000 Rp 977,900.00 Rp 977,900
Alat Bantu bh 1.000 Rp 48,895.00 Rp 48,895
Upah Pasang :
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Kepala tukang hari 0.286 Rp 155,000.00 Rp 44,286
Mandor hari 0.143 Rp 155,000.00 Rp 22,143
Jumlah Rp 1,134,652
Keuntungan 10% Rp 113,465
Analisa Harga Satuan Pekerjaan MEP - page 139 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Total = Jumlah+(Keuntungan 10%) Rp 1,248,117

1 UNIT Pengadaan & Pemasangan STRAINER DIA.40 MM' Rp 1,072,000


Pengadaan & Pemasangan STRAINER DIA.40 MM' bh 1.000 Rp 825,000.00 Rp 825,000
Alat Bantu bh 1.000 Rp 41,250.00 Rp 41,250
Upah Pasang :
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Kepala tukang hari 0.286 Rp 155,000.00 Rp 44,286
Mandor hari 0.143 Rp 155,000.00 Rp 22,143
Jumlah Rp 974,107
Keuntungan 10% Rp 97,411
Total = Jumlah+(Keuntungan 10%) Rp 1,071,518

1 UNIT Pengadaan & Pemasangan STRAINER DIA.32 MM' Rp 800,000


Pengadaan & Pemasangan STRAINER DIA.32 MM' bh 1.000 Rp 590,000.00 Rp 590,000
Alat Bantu bh 1.000 Rp 29,500.00 Rp 29,500
Upah Pasang :
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Kepala tukang hari 0.286 Rp 155,000.00 Rp 44,286
Mandor hari 0.143 Rp 155,000.00 Rp 22,143
Jumlah Rp 727,357
Keuntungan 10% Rp 72,736
Total = Jumlah+(Keuntungan 10%) Rp 800,093

1 UNIT Pengadaan & Pemasangan CHECK VALVE DIA.65 MM' Rp 1,100,000


Pengadaan & Pemasangan CHECK VALVE DIA.65 MM' bh 1.000 Rp 850,000.00 Rp 850,000
Alat Bantu bh 1.000 Rp 42,500.00 Rp 42,500
Upah Pasang :
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Kepala tukang hari 0.286 Rp 155,000.00 Rp 44,286
Mandor hari 0.143 Rp 155,000.00 Rp 22,143
Jumlah Rp 1,000,357
Keuntungan 10% Rp 100,036
Total = Jumlah+(Keuntungan 10%) Rp 1,100,393

1 UNIT Pengadaan & Pemasangan CHECK VALVE DIA.50 MM' Rp 869,000


Pengadaan & Pemasangan CHECK VALVE DIA.50 MM' bh 1.000 Rp 650,000.00 Rp 650,000
Alat Bantu bh 1.000 Rp 32,500.00 Rp 32,500
Upah Pasang :
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Kepala tukang hari 0.286 Rp 155,000.00 Rp 44,286
Mandor hari 0.143 Rp 155,000.00 Rp 22,143
Jumlah Rp 790,357
Keuntungan 10% Rp 79,036
Total = Jumlah+(Keuntungan 10%) Rp 869,393

1 UNIT Pengadaan & Pemasangan CHECK VALVE DIA.32 MM' Rp 488,000


Pengadaan & Pemasangan CHECK VALVE DIA.32 MM' bh 1.000 Rp 320,000.00 Rp 320,000
Alat Bantu bh 1.000 Rp 16,000.00 Rp 16,000
Upah Pasang :
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Kepala tukang hari 0.286 Rp 155,000.00 Rp 44,286
Mandor hari 0.143 Rp 155,000.00 Rp 22,143
Jumlah Rp 443,857
Keuntungan 10% Rp 44,386
Total = Jumlah+(Keuntungan 10%) Rp 488,243

1 UNIT Pengadaan & Pemasangan CHECK VALVE DIA.20 MM' Rp 374,000


Pengadaan & Pemasangan CHECK VALVE DIA.20 MM' bh 1.000 Rp 221,000.00 Rp 221,000
Alat Bantu bh 1.000 Rp 11,050.00 Rp 11,050
Upah Pasang :
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Kepala tukang hari 0.286 Rp 155,000.00 Rp 44,286
Mandor hari 0.143 Rp 155,000.00 Rp 22,143
Jumlah Rp 339,907
Keuntungan 10% Rp 33,991
Total = Jumlah+(Keuntungan 10%) Rp 373,898

1 BH Pengadaan & Pemasangan GATE VALVE DIA.15 MM /10 Kg Rp 633,000


GATE VALVE DIA.15 MM /10 Kg bh 1.000 Rp 450,000.00 Rp 450,000
Tukang pipa hari 0.333 Rp 145,000.00 Rp 48,333
Kepala tukang pipa hari 0.333 Rp 155,000.00 Rp 51,667
Mandor hari 0.167 Rp 155,000.00 Rp 25,833
Jumlah Rp 575,833
Keuntungan 10% Rp 57,583
Total = Jumlah+(Keuntungan 10%) Rp 633,417

1 BH Pengadaan & Pemasangan GATE VALVE DIA.20 MM /10 Kg Rp 853,000


Pengadaan & Pemasangan GATE VALVE DIA.20 MM /10 Kg bh 1.000 Rp 650,000.00 Rp 650,000
Tukang hari 0.333 Rp 145,000.00 Rp 48,333
Kepala tukang hari 0.333 Rp 155,000.00 Rp 51,667
Mandor hari 0.167 Rp 155,000.00 Rp 25,833
Jumlah Rp 775,833
Keuntungan 10% Rp 77,583
Total = Jumlah+(Keuntungan 10%) Rp 853,417

1 BH Pengadaan & Pemasangan GATE VALVE DIA.25 MM /10 Kg Rp 944,000


GATE VALVE DIA.25 MM / 10 Kg bh 1.000 Rp 750,000.00 Rp 750,000
Analisa Harga Satuan Pekerjaan MEP - page 140 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Kepala tukang hari 0.286 Rp 155,000.00 Rp 44,286
Mandor hari 0.143 Rp 155,000.00 Rp 22,143
Jumlah Rp 857,857
Keuntungan 10% Rp 85,786
Total = Jumlah+(Keuntungan 10%) Rp 943,643

1 BH Pengadaan & Pemasangan GATE VALVE DIA.32 MM /10 Kg Rp 1,329,000


GATE VALVE DIA.32 MM / 10 Kg bh 1.000 Rp 1,100,000.00 Rp 1,100,000
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Kepala tukang hari 0.286 Rp 155,000.00 Rp 44,286
Mandor hari 0.143 Rp 155,000.00 Rp 22,143
Jumlah Rp 1,207,857
Keuntungan 10% Rp 120,786
Total = Jumlah+(Keuntungan 10%) Rp 1,328,643

1 BH Pengadaan & Pemasangan GATE VALVE DIA.40 MM /10 Kg Rp 1,623,000


GATE VALVE DIA.40 MM / 10 Kg bh 1.000 Rp 1,350,000.00 Rp 1,350,000
Tukang hari 0.333 Rp 145,000.00 Rp 48,333
Kepala tukang hari 0.333 Rp 155,000.00 Rp 51,667
Mandor hari 0.167 Rp 155,000.00 Rp 25,833
Jumlah Rp 1,475,833
Keuntungan 10% Rp 147,583
Total = Jumlah+(Keuntungan 10%) Rp 1,623,417

1 BH Pengadaan & Pemasangan GATE VALVE DIA.50 MM /10 Kg Rp 1,769,000


GATE VALVE DIA.50 MM / 10 Kg bh 1.000 Rp 1,500,000.00 Rp 1,500,000
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Kepala tukang hari 0.286 Rp 155,000.00 Rp 44,286
Mandor hari 0.143 Rp 155,000.00 Rp 22,143
Jumlah Rp 1,607,857
Keuntungan 10% Rp 160,786
Total = Jumlah+(Keuntungan 10%) Rp 1,768,643

1 BH Pengadaan & Pemasangan GATE VALVE DIA.65 MM /10 Kg Rp 1,934,000


GATE VALVE DIA.65 MM / 10 Kg bh 1.000 Rp 1,650,000.00 Rp 1,650,000
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Kepala tukang hari 0.286 Rp 155,000.00 Rp 44,286
Mandor hari 0.143 Rp 155,000.00 Rp 22,143
Jumlah Rp 1,757,857
Keuntungan 10% Rp 175,786
Total = Jumlah+(Keuntungan 10%) Rp 1,933,643

1 set Pengadaan & Pemasangan Presure Gauge + Ball Valve dia, 1.2 " Rp 837,000
Pressure Gauge bh 1.000 Rp 550,000.00 Rp 550,000
Ball valve dia. 1/2 " bh 1.000 Rp 130,000.00 Rp 130,000
Tukang hari 0.214 Rp 145,000.00 Rp 31,071
Kepala tukang hari 0.214 Rp 155,000.00 Rp 33,214
Mandor hari 0.107 Rp 155,000.00 Rp 16,607
Jumlah Rp 760,893
Keuntungan 10% Rp 76,089
Total = Jumlah+(Keuntungan 10%) Rp 836,982
1 bh Pengadaan & Pemasangan Kran Taman Rp 354,000
Kran Taman bh 1.000 Rp 250,000.00 Rp 250,000
Pekerja hari 0.010
Tukang hari 0.400 Rp 145,000.00 Rp 58,000
Kepala tukang hari 0.040 Rp 155,000.00 Rp 6,200
Mandor hari 0.050 Rp 155,000.00 Rp 7,750
Jumlah Rp 321,950
Keuntungan 10% Rp 32,195
Total = Jumlah+(Keuntungan 10%) Rp 354,145

1 M' Pengadaan & Pemasangan PIPA POLLYPROPELINE DIA. 1/2" PN-10 Rp 25,000
Pipa Polypropeline dia. 1/2” Meter 1.000 Rp 11,500.00 Rp 11,500
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 3,450.00 Rp 3,450
Tukang hari 0.021 Rp 145,000.00 Rp 3,107
Kepala tukang hari 0.021 Rp 155,000.00 Rp 3,321
Mandor hari 0.011 Rp 155,000.00 Rp 1,661
Jumlah Rp 23,039
Keuntungan 10% Rp 2,304
Total = Jumlah+(Keuntungan 10%) Rp 25,343

1 M' Pengadaan & Pemasangan PIPA POLLYPROPELINE DIA. 3/4" / PN-10 Rp 30,000
Polypropeline dia. 3/4” Meter 1.000 Rp 15,000.00 Rp 15,000
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 4,500.00 Rp 4,500
Tukang hari 0.021 Rp 145,000.00 Rp 3,107
Kepala tukang hari 0.021 Rp 155,000.00 Rp 3,321
Mandor hari 0.011 Rp 155,000.00 Rp 1,661
Jumlah Rp 27,589
Keuntungan 10% Rp 2,759
Total = Jumlah+(Keuntungan 10%) Rp 30,348

1 M' Pengadaan & Pemasangan PIPA POLLYPROPELINE DIA. 1" / PN - 10 Rp 43,000


Polypropeline dia. 1” Meter 1.000 Rp 23,800.00 Rp 23,800
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 7,140.00 Rp 7,140
Tukang hari 0.021 Rp 145,000.00 Rp 3,107
Kepala tukang hari 0.021 Rp 155,000.00 Rp 3,321
Mandor hari 0.011 Rp 155,000.00 Rp 1,661
Analisa Harga Satuan Pekerjaan MEP - page 141 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Jumlah Rp 39,029
Keuntungan 10% Rp 3,903
Total = Jumlah+(Keuntungan 10%) Rp 42,932

1 M' Pengadaan & Pemasangan PIPA POLLYPROPELINE DIA. 1 1/4" / PN - 10 Rp 63,000


Polypropeline dia. 1 1/4 ” Meter 1.000 Rp 37,500.00 Rp 37,500
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 11,250.00 Rp 11,250
Tukang hari 0.021 Rp 145,000.00 Rp 3,107
Kepala tukang hari 0.021 Rp 155,000.00 Rp 3,321
Mandor hari 0.011 Rp 155,000.00 Rp 1,661
Jumlah Rp 56,839
Keuntungan 10% Rp 5,684
Total = Jumlah+(Keuntungan 10%) Rp 62,523

1 M' Pengadaan & Pemasangan PIPA POLLYPROPELINE DIA. 1 1/2" / PN - 10 Rp 91,000


Polypropeline dia. 1 1/2” Meter 1.000 Rp 57,500.00 Rp 57,500
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 17,250.00 Rp 17,250
Tukang hari 0.021 Rp 145,000.00 Rp 3,107
Kepala tukang hari 0.021 Rp 155,000.00 Rp 3,321
Mandor hari 0.011 Rp 155,000.00 Rp 1,661
Jumlah Rp 82,839
Keuntungan 10% Rp 8,284
Total = Jumlah+(Keuntungan 10%) Rp 91,123

1 M' Pengadaan & Pemasangan PIPA POLLYPROPELINE DIA. 2" / PN - 10 Rp 138,000


Polypropeline dia. 2 ” Meter 1.000 Rp 90,000.00 Rp 90,000
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 27,000.00 Rp 27,000
Tukang hari 0.021 Rp 145,000.00 Rp 3,107
Kepala tukang hari 0.021 Rp 155,000.00 Rp 3,321
Mandor hari 0.011 Rp 155,000.00 Rp 1,661
Jumlah Rp 125,089
Keuntungan 10% Rp 12,509
Total = Jumlah+(Keuntungan 10%) Rp 137,598

1 M' Pengadaan & Pemasangan PIPA POLLYPROPELINE DIA. 2 1/2" / PN - 10 Rp 191,000


Polypropeline dia. 2 1/2” Meter 1.000 Rp 127,500.00 Rp 127,500
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 38,250.00 Rp 38,250
Tukang hari 0.021 Rp 145,000.00 Rp 3,107
Kepala tukang hari 0.021 Rp 155,000.00 Rp 3,321
Mandor hari 0.011 Rp 155,000.00 Rp 1,661
Jumlah Rp 173,839
Keuntungan 10% Rp 17,384
Total = Jumlah+(Keuntungan 10%) Rp 191,223

1 M' Pengadaan & Pemasangan PIPA POLLYPROPELINE DIA. 3" / PN - 10 Rp 277,000


Polypropeline dia. 3 ” Meter 1.000 Rp 187,500.00 Rp 187,500
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 56,250.00 Rp 56,250
Tukang hari 0.021 Rp 145,000.00 Rp 3,107
Kepala tukang hari 0.021 Rp 155,000.00 Rp 3,321
Mandor hari 0.011 Rp 155,000.00 Rp 1,661
Jumlah Rp 251,839
Keuntungan 10% Rp 25,184
Total = Jumlah+(Keuntungan 10%) Rp 277,023

1 M' Pengadaan & Pemasangan PIPA POLLYPROPELINE DIA. 6" / PN - 10 Rp 909,000


Polypropeline dia. 6 ” Meter 1.000 Rp 625,000.00 Rp 625,000
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 187,500.00 Rp 187,500
Tukang hari 0.036 Rp 145,000.00 Rp 5,179
Kepala tukang hari 0.036 Rp 155,000.00 Rp 5,536
Mandor hari 0.018 Rp 155,000.00 Rp 2,768
Jumlah Rp 825,982
Keuntungan 10% Rp 82,598
Total = Jumlah+(Keuntungan 10%) Rp 908,580

1 BH Pengadaan & Pemasangan PIPA HEADER DIA. 100 MM Rp 723,000


Polypropeline dia. 4 ” Meter 2.000 Rp 275,000.00 Rp 550,000
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 82,500.00 Rp 82,500
Tukang hari 0.080 Rp 145,000.00 Rp 11,600
Kepala tukang hari 0.080 Rp 155,000.00 Rp 12,400
Mandor hari 0.005 Rp 155,000.00 Rp 753
Jumlah Rp 657,253
Keuntungan 10% Rp 65,725
Total = Jumlah+(Keuntungan 10%) Rp 722,979

1 BH Pengadaan & Pemasangan Panel kontrol Pompa AB Rp 14,034,000


Panel kontrol Pompa AB set 1.000 Rp 12,500,000.00 Rp 12,500,000
Tukang hari 0.714 Rp 145,000.00 Rp 103,571
Kepala tukang hari 0.714 Rp 155,000.00 Rp 110,714
Mandor hari 0.286 Rp 155,000.00 Rp 44,286
Jumlah Rp 12,758,571
Keuntungan 10% Rp 1,275,857
Total = Jumlah+(Keuntungan 10%) Rp 14,034,429

1 UNIT Pengadaan & Pemasangan TANKI RO ( SS ) 2000 LITER Rp 595,000


Tanki RO 2000 liter Unit 1.000 Rp - Rp -
Peralatan bantu & accessories lot 1.000 Rp - Rp -
Tukang hari 1.500 Rp 145,000.00 Rp 217,500
Kepala Tukang hari 1.500 Rp 155,000.00 Rp 232,500
Analisa Harga Satuan Pekerjaan MEP - page 142 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Mandor hari 0.750 Rp 155,000.00 Rp 116,250
Jumlah Rp 566,250
Keuntungan + Overhead 5% 28,312.50
Total = Jumlah +( Keuntungan + Overhead
594,562.50
5%)

1 SET Pengadaan & Pemasangan SYSTEM RO Rp -


1 Raw water unit 1.000 Rp -
kap.2000 liter
bahan Polyethylene/PE
2 Pompa Filter bh 2.000 Rp -
Kap. 40 Liter/menit
Total Head 25 m
3 Sand Filter unit 1.000 Rp -
Tipe : Pressure Filter
Kapasitas : 1 m3.jam
4 Activated Carbon Filter unit 1.000 Rp -
Tipe : Pressure Filter
Kapasitas : 14 m3.jam
Material Tangki : FRP- polyglass - Pent air / Luso
5 Manganesse zeolite Filter unit 1.000 Rp -
Tipe : Pressure Filter
Kapasitas : 14 m3/hour
Material Tangki : FRP- polyglass - Pent air / Luso
6 Micro filter.1 unit 1.000 Rp -
Housing
Model : Clear or Blue housing
Dimensi : 20 " length
Inlet / outlet : 3/4 " connection
7 Ozon Circulation Tank ( Product Tank ) unit 1.000 Rp -
Product
Volume : 1 500 liter
Material Tangki : Stainless Steel
8 Ozon Circulation pump unit 1.000 Rp -
Kapasitas : 30 Lpm (1,8 m3/jam )
9 Ozonisation unit 1.000 Rp -
Kapasitas : 10 gr/jam O3
10 Ventury injector unit 1.000 Rp -
Model : Injector - PVDF
Size : 3/4 " connection
11 UV pump unit 2.000 Rp -
Kapasitas : 30 Lpm ( 1,8 m3/jam
T. Head : 25 m
Body & Impeller: Stainless Steel
12 Micro filter 2 unit 2.000 Rp -
Housing
Model : Clear or Blue housing
Dimensi : 20 " length
Inlet / outlet : 3/4 " connection
13 Micro filter 3 unit 1.000 Rp -
Housing
Model : Clear or Blue housing
Dimensi : 20 " length
Inlet / outlet : 3/4 " connection
14 Ultra Violet unit 1.000 Rp -
Flow frate : 8 Gpm ( 1,8 m3/jam )
15 Distribution pump (2 Unit) unit 2.000 Rp -
Kapasitas : 30 Lpm ( 1,8 m3/jam )
T. Head : 25 m
16 Interconnection Pipe (1 Unit) unit 1.000 Rp -
Material : PVC - AW
Accessories : Valve, fitting & suport )
17 Panel Control & Electrical unit 1.000 Rp -
18 Peralatan bantu & accessories lot 1.000 Rp -
Tukang hari 2.000 Rp -
Kepala Tukang hari 4.000 Rp -
Mandor hari 4.000 Rp -
Jumlah -
Keuntungan + Overhead 5% -
Total = Jumlah +( Keuntungan + Overhead 5%)
-

PEKERJAAN AIR KOTOR


1 UNIT PEMBUATAN POMPA SUBMERSIBLE SUMPIT Rp 13,839,000
SUBMERSIBLE SUMPIT Unit 1.000 Rp 12,500,000.00 Rp 12,500,000
Tukang hari 0.214 Rp 145,000.00 Rp 31,071
Kepala Tukang hari 0.214 Rp 155,000.00 Rp 33,214
Mandor hari 0.107 Rp 155,000.00 Rp 16,607
Jumlah Rp 12,580,893
Keuntungan 10% Rp 1,258,089
Total = Jumlah+(Keuntungan 10%) Rp 13,838,982

1 UNIT PEMBUATAN GREASE TRAP Rp 4,214,000


PEMBUATAN GREASE TRAP Unit 1.000 Rp 3,750,000.00 Rp 3,750,000
Tukang hari 0.214 Rp 145,000.00 Rp 31,071
Kepala Tukang hari 0.214 Rp 155,000.00 Rp 33,214
Mandor hari 0.107 Rp 155,000.00 Rp 16,607
Jumlah Rp 3,830,893
Keuntungan 10% Rp 383,089
Total = Jumlah+(Keuntungan 10%) Rp 4,213,982

Analisa Harga Satuan Pekerjaan MEP - page 143 of 215


NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
1 UNIT PEMBUATAN SEPTIK TANK BIOTECH KAP. 1,2 M3/day Rp 6,771,000
PEMBUATAN SEPTIK TANK KAP. 1,2 M3 / day Unit 1.000 Rp 4,500,000.00 Rp 4,500,000
Perkuatan ls 1.000 Rp 1,575,000.00 Rp 1,575,000
Tukang hari 0.214 Rp 145,000.00 Rp 31,071
Kepala Tukang hari 0.214 Rp 155,000.00 Rp 33,214
Mandor hari 0.107 Rp 155,000.00 Rp 16,607
Jumlah Rp 6,155,893
Keuntungan 10% Rp 615,589
Total = Jumlah+(Keuntungan 10%) Rp 6,771,482

1 UNIT PEMBUATAN SEPTIK TANK BIOTECH KAP. 6 M3/day Rp 40,926,000


PEMBUATAN SEPTIK TANK BIOTECH KAP. 6 M3/day Unit 1.000 Rp 27,500,000.00 Rp 27,500,000
Perkuatan ls 1.000 Rp 9,625,000.00 Rp 9,625,000
Tukang hari 0.214 Rp 145,000.00 Rp 31,071
Kepala Tukang hari 0.214 Rp 155,000.00 Rp 33,214
Mandor hari 0.107 Rp 155,000.00 Rp 16,607
Jumlah Rp 37,205,893
Keuntungan 10% Rp 3,720,589
Total = Jumlah+(Keuntungan 10%) Rp 40,926,482

1 M' Pengadaan & Pemasangan PIPA PVC AW Dia. 1/2” Rp 12,000


PIPA PVC AW Dia. 1/2” Meter 1.000 Rp 5,500.00 Rp 5,500
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 1,375.00 Rp 1,375
Tukang hari 0.017 Rp 145,000.00 Rp 2,417
Kepala tukang hari 0.008 Rp 155,000.00 Rp 1,292
Mandor hari 0.004 Rp 155,000.00 Rp 646
Jumlah Rp 11,229
Keuntungan 10% Rp 1,123
Total = Jumlah+(Keuntungan 10%) Rp 12,352

1 M' Pengadaan & Pemasangan PIPA PVC AW Dia. 3/4” Rp 16,000


PIPA PVC AW dia. 3/4” Meter 1.000 Rp 8,200.00 Rp 8,200
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 2,050.00 Rp 2,050
Tukang hari 0.017 Rp 145,000.00 Rp 2,417
Kepala tukang hari 0.008 Rp 155,000.00 Rp 1,292
Mandor hari 0.004 Rp 155,000.00 Rp 646
Jumlah Rp 14,604
Keuntungan 10% Rp 1,460
Total = Jumlah+(Keuntungan 10%) Rp 16,065

1 M' Pengadaan & Pemasangan PIPA PVC AW Dia. 1” Rp 19,000


PIPA PVC AW Dia. 1” Meter 1.000 Rp 10,200.00 Rp 10,200
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 2,550.00 Rp 2,550
Tukang hari 0.017 Rp 145,000.00 Rp 2,417
Kepala tukang hari 0.008 Rp 155,000.00 Rp 1,292
Mandor hari 0.004 Rp 155,000.00 Rp 646
Jumlah Rp 17,104
Keuntungan 10% Rp 1,710
Total = Jumlah+(Keuntungan 10%) Rp 18,815

1 M' Pengadaan & Pemasangan PIPA PVC AW Dia. 1 1/4” Rp 29,000


PIPA PVC AW Dia. 1 1/4” Meter 1.000 Rp 17,500.00 Rp 17,500
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 4,375.00 Rp 4,375
Tukang hari 0.017 Rp 145,000.00 Rp 2,417
Kepala tukang hari 0.008 Rp 155,000.00 Rp 1,292
Mandor hari 0.004 Rp 155,000.00 Rp 646
Jumlah Rp 26,229
Keuntungan 10% Rp 2,623
Total = Jumlah+(Keuntungan 10%) Rp 28,852

1 M' Pengadaan & Pemasangan PIPA PVC AW Dia. 1 1/2” Rp 30,000


PIPA PVC AW Dia. 1 1/2” Meter 1.000 Rp 18,500.00 Rp 18,500
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 4,625.00 Rp 4,625
Tukang hari 0.017 Rp 145,000.00 Rp 2,417
Kepala tukang hari 0.008 Rp 155,000.00 Rp 1,292
Mandor hari 0.004 Rp 155,000.00 Rp 646
Jumlah Rp 27,479
Keuntungan 10% Rp 2,748
Total = Jumlah+(Keuntungan 10%) Rp 30,227

1 M' Pengadaan & Pemasangan PIPA PVC AW Dia. 2” Rp 47,000


PIPA PVC AW Dia. 2” Meter 1.000 Rp 23,900.00 Rp 23,900
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 5,975.00 Rp 5,975
Tukang hari 0.033 Rp 145,000.00 Rp 4,833
Kepala tukang hari 0.033 Rp 155,000.00 Rp 5,167
Mandor hari 0.017 Rp 155,000.00 Rp 2,583
Jumlah Rp 42,458
Keuntungan 10% Rp 4,246
Total = Jumlah+(Keuntungan 10%) Rp 46,704

1 M' Pengadaan & Pemasangan PIPA PVC AW Dia. 2 1/2” Rp 66,000


PIPA PVC AW Dia. 2 1/2” Meter 1.000 Rp 37,900.00 Rp 37,900
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 9,475.00 Rp 9,475
Tukang hari 0.033 Rp 145,000.00 Rp 4,833
Kepala tukang hari 0.033 Rp 155,000.00 Rp 5,167
Mandor hari 0.017 Rp 155,000.00 Rp 2,583
Jumlah Rp 59,958
Analisa Harga Satuan Pekerjaan MEP - page 144 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Keuntungan 10% Rp 5,996
Total = Jumlah+(Keuntungan 10%) Rp 65,954

1 M' Pengadaan & Pemasangan PIPA PVC AW Dia. 3” Rp 87,000


PIPA PVC AW Dia. 3” Meter 1.000 Rp 48,500.00 Rp 48,500
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 12,125.00 Rp 12,125
Tukang hari 0.050 Rp 145,000.00 Rp 7,250
Kepala tukang hari 0.050 Rp 155,000.00 Rp 7,750
Mandor hari 0.025 Rp 155,000.00 Rp 3,875
Jumlah Rp 79,500
Keuntungan 10% Rp 7,950
Total = Jumlah+(Keuntungan 10%) Rp 87,450

1 M' Pengadaan & Pemasangan PIPA PVC AW Dia. 4” Rp 135,000


PIPA PVC AW Dia. 4” Meter 1.000 Rp 77,800.00 Rp 77,800
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 19,450.00 Rp 19,450
Tukang hari 0.067 Rp 145,000.00 Rp 9,667
Kepala tukang hari 0.067 Rp 155,000.00 Rp 10,333
Mandor hari 0.033 Rp 155,000.00 Rp 5,167
Jumlah Rp 122,417
Keuntungan 10% Rp 12,242
Total = Jumlah+(Keuntungan 10%) Rp 134,658

1 M' Pengadaan & Pemasangan PIPA PVC AW Dia. 6” Rp 248,000


PIPA PVC AW Dia. 6” Meter 1.000 Rp 155,000.00 Rp 155,000
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 38,750.00 Rp 38,750
Tukang hari 0.083 Rp 145,000.00 Rp 12,083
Kepala tukang hari 0.083 Rp 155,000.00 Rp 12,917
Mandor hari 0.042 Rp 155,000.00 Rp 6,458
Jumlah Rp 225,208
Keuntungan 10% Rp 22,521
Total = Jumlah+(Keuntungan 10%) Rp 247,729

1 M' Pengadaan & Pemasangan PIPA PVC AW Dia. 8” Rp 543,000


PIPA PVC AW Dia. 8” Meter 1.000 Rp 365,000.00 Rp 365,000
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 91,250.00 Rp 91,250
Tukang hari 0.100 Rp 145,000.00 Rp 14,500
Kepala tukang hari 0.100 Rp 155,000.00 Rp 15,500
Mandor hari 0.050 Rp 155,000.00 Rp 7,750
Jumlah Rp 494,000
Keuntungan 10% Rp 49,400
Total = Jumlah+(Keuntungan 10%) Rp 543,400

1 M' Pengadaan & Pemasangan PIPA PVC AW Dia. 10” Rp 763,000


PIPA PVC AW Dia. 10” Meter 1.000 Rp 525,000.00 Rp 525,000
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 131,250.00 Rp 131,250
Tukang hari 0.100 Rp 145,000.00 Rp 14,500
Kepala tukang hari 0.100 Rp 155,000.00 Rp 15,500
Mandor hari 0.050 Rp 155,000.00 Rp 7,750
Jumlah Rp 694,000
Keuntungan 10% Rp 69,400
Total = Jumlah+(Keuntungan 10%) Rp 763,400

1 M' Pengadaan & Pemasangan PIPA PVC kls. D Dia. 2” Rp 43,000


PIPA PVC kls. D Dia. 2” Meter 1.000 Rp 21,510.00 Rp 21,510
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 5,377.50 Rp 5,378
Tukang hari 0.033 Rp 145,000.00 Rp 4,833
Kepala tukang hari 0.033 Rp 155,000.00 Rp 5,167
Mandor hari 0.017 Rp 155,000.00 Rp 2,583
Jumlah Rp 39,471
Keuntungan 10% Rp 3,947
Total = Jumlah+(Keuntungan 10%) Rp 43,418

1 M' Pengadaan & Pemasangan PIPA PVC kls. D Dia. 1 1/4” Rp 26,000
PIPA PVC kls. D Dia. 1 1/4” Meter 1.000 Rp 15,750.00 Rp 15,750
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 3,937.50 Rp 3,938
Tukang hari 0.017 Rp 145,000.00 Rp 2,417
Kepala tukang hari 0.008 Rp 155,000.00 Rp 1,292
Mandor hari 0.004 Rp 155,000.00 Rp 646
Jumlah Rp 24,042
Keuntungan 10% Rp 2,404
Total = Jumlah+(Keuntungan 10%) Rp 26,446
1 M' Pengadaan & Pemasangan PIPA PVC kls. D Dia. 4” Rp 109,000
PIPA PVC kls. D Dia. 4” Meter 1.000 Rp 70,020.00 Rp 70,020
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 24,507.00 Rp 24,507
Tukang hari 0.017 Rp 145,000.00 Rp 2,417
Kepala tukang hari 0.008 Rp 155,000.00 Rp 1,292
Mandor hari 0.004 Rp 155,000.00 Rp 646
Jumlah Rp 98,881
Keuntungan 10% Rp 9,888
Total = Jumlah+(Keuntungan 10%) Rp 108,769
1 M' Pengadaan & Pemasangan PIPA PVC kls. D Dia. 6” Rp 212,000
PIPA PVC kls. D Dia. 6” Meter 1.000 Rp 139,500.00 Rp 139,500
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 48,825.00 Rp 48,825
Tukang hari 0.017 Rp 145,000.00 Rp 2,417
Kepala tukang hari 0.008 Rp 155,000.00 Rp 1,292
Mandor hari 0.004 Rp 155,000.00 Rp 646
Jumlah Rp 192,679
Analisa Harga Satuan Pekerjaan MEP - page 145 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Keuntungan 10% Rp 19,268
Total = Jumlah+(Keuntungan 10%) Rp 211,947
1 M' Pengadaan & Pemasangan PIPA PVC kls. D Dia. 8” Rp 493,000
PIPA PVC kls. D Dia. 8” Meter 1.000 Rp 328,500.00 Rp 328,500
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 114,975.00 Rp 114,975
Tukang hari 0.017 Rp 145,000.00 Rp 2,417
Kepala tukang hari 0.008 Rp 155,000.00 Rp 1,292
Mandor hari 0.004 Rp 155,000.00 Rp 646
Jumlah Rp 447,829
Keuntungan 10% Rp 44,783
Total = Jumlah+(Keuntungan 10%) Rp 492,612
1 M' Pengadaan & Pemasangan PIPA PVC kls. D Dia. 10” Rp 691,000
PIPA PVC kls. D Dia. 10” Meter 1.000 Rp 472,500.00 Rp 472,500
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 118,125.00 Rp 118,125
Tukang hari 0.100 Rp 145,000.00 Rp 14,500
Kepala tukang hari 0.100 Rp 155,000.00 Rp 15,500
Mandor hari 0.050 Rp 155,000.00 Rp 7,750
Jumlah Rp 628,375
Keuntungan 10% Rp 62,838
Total = Jumlah+(Keuntungan 10%) Rp 691,213

1 M' Pengadaan & Pemasangan PIPA PVC kls. D Dia. 12” Rp 821,000
PIPA PVC kls. D Dia. 12” Meter 1.000 Rp 567,000.00 Rp 567,000
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 141,750.00 Rp 141,750
Tukang hari 0.100 Rp 145,000.00 Rp 14,500
Kepala tukang hari 0.100 Rp 155,000.00 Rp 15,500
Mandor hari 0.050 Rp 155,000.00 Rp 7,750
Jumlah Rp 746,500
Keuntungan 10% Rp 74,650
Total = Jumlah+(Keuntungan 10%) Rp 821,150
1 BH Pengadaan & Pemasangan CLEAN OUT DIA. 200 mm Rp 686,000
Pengadaan & Pemasangan CLEAN OUT DIA. 200 mm bh 1.000 Rp 570,000.00 Rp 570,000
Tukang hari 0.143 Rp 145,000.00 Rp 20,714
Kepala tukang hari 0.143 Rp 155,000.00 Rp 22,143
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Jumlah Rp 623,929
Keuntungan 10% Rp 62,393
Total = Jumlah+(Keuntungan 10%) Rp 686,321

1 BH Pengadaan & Pemasangan CLEAN OUT DIA. 150 mm Rp 549,000


Pengadaan & Pemasangan CLEAN OUT DIA. 150 mm bh 1.000 Rp 445,000.00 Rp 445,000
Tukang hari 0.143 Rp 145,000.00 Rp 20,714
Kepala tukang hari 0.143 Rp 155,000.00 Rp 22,143
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Jumlah Rp 498,929
Keuntungan 10% Rp 49,893
Total = Jumlah+(Keuntungan 10%) Rp 548,821

1 BH Pengadaan & Pemasangan CLEAN OUT DIA. 100 mm Rp 345,000


Pengadaan & Pemasangan CLEAN OUT DIA. 100 mm (Toto) bh 1.000 Rp 260,000.00 Rp 260,000
Tukang hari 0.143 Rp 145,000.00 Rp 20,714
Kepala tukang hari 0.143 Rp 155,000.00 Rp 22,143
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Jumlah Rp 313,929
Keuntungan 10% Rp 31,393
Total = Jumlah+(Keuntungan 10%) Rp 345,321

1 BH Pengadaan & Pemasangan CLEAN OUT DIA. 80 mm Rp 301,000


Pengadaan & Pemasangan CLEAN OUT DIA. 80 mm bh 1.000 Rp 220,000.00 Rp 220,000
Tukang hari 0.143 Rp 145,000.00 Rp 20,714
Kepala tukang hari 0.143 Rp 155,000.00 Rp 22,143
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Jumlah Rp 273,929
Keuntungan 10% Rp 27,393
Total = Jumlah+(Keuntungan 10%) Rp 301,321

1 BH Pengadaan & Pemasangan CLEAN OUT DIA. 65 mm Rp 246,000


Pengadaan & Pemasangan CLEAN OUT DIA. 65 mm bh 1.000 Rp 170,000.00 Rp 170,000
Tukang hari 0.143 Rp 145,000.00 Rp 20,714
Kepala tukang hari 0.143 Rp 155,000.00 Rp 22,143
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Jumlah Rp 223,929
Keuntungan 10% Rp 22,393
Total = Jumlah+(Keuntungan 10%) Rp 246,321

1 BH Pengadaan & Pemasangan CLEAN OUT DIA. 50 mm Rp 230,000


Pengadaan & Pemasangan CLEAN OUT DIA. 50 mm bh 1.000 Rp 155,000.00 Rp 155,000
Tukang hari 0.143 Rp 145,000.00 Rp 20,714
Kepala Tukang hari 0.143 Rp 155,000.00 Rp 22,143
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Jumlah Rp 208,929
Keuntungan 10% Rp 20,893
Total = Jumlah+(Keuntungan 10%) Rp 229,821
1 UNIT Pengadaan & Pemasangan Roof Drain dia. 150 mm Rp 664,000
Roof Drain dia. 15 mm Unit 1.000 Rp 550,000.00 Rp 550,000
Tukang hari 0.143 Rp 145,000.00 Rp 20,714
Kepala Tukang hari 0.143 Rp 155,000.00 Rp 22,143
Analisa Harga Satuan Pekerjaan MEP - page 146 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Jumlah Rp 603,929
Keuntungan 10% Rp 60,393
Total = Jumlah+(Keuntungan 10%) Rp 664,321
1 UNIT Pengadaan & Pemasangan Roof Drain dia. 100 mm Rp 554,000
Roof Drain dia. 100 mm Unit 1.000 Rp 450,000.00 Rp 450,000
Tukang hari 0.143 Rp 145,000.00 Rp 20,714
Kepala Tukang hari 0.143 Rp 155,000.00 Rp 22,143
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Jumlah Rp 503,929
Keuntungan 10% Rp 50,393
Total = Jumlah+(Keuntungan 10%) Rp 554,321
1 UNIT Pengadaan & Pemasangan Roof Drain dia. 80 mm Rp 494,000
Roof Drain dia. 80 mm Unit 1.000 Rp 395,000.00 Rp 395,000
Tukang hari 0.143 Rp 145,000.00 Rp 20,714
Kepala Tukang hari 0.143 Rp 155,000.00 Rp 22,143
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Jumlah Rp 448,929
Keuntungan 10% Rp 44,893
Total = Jumlah+(Keuntungan 10%) Rp 493,821

1 UNIT Pengadaan & Pemasangan Roof Drain dia. 50 mm Rp 411,000


ROOF DRAIN
Roof Drain dia. 50 mm Unit 1.000 Rp 320,000.00 Rp 320,000
Tukang hari 0.143 Rp 145,000.00 Rp 20,714
Kepala Tukang hari 0.143 Rp 155,000.00 Rp 22,143
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Jumlah Rp 373,929
Keuntungan 10% Rp 37,393
Total = Jumlah+(Keuntungan 10%) Rp 411,321

1 UNIT Pengadaan & Pemasangan Roof Drain dia. 65 mm Rp 384,000


ROOF DRAIN
Roof Drain dia. 65 mm Unit 1.000 Rp 295,000.00 Rp 295,000
Tukang hari 0.143 Rp 145,000.00 Rp 20,714
Kepala Tukang hari 0.143 Rp 155,000.00 Rp 22,143
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Jumlah Rp 348,929
Keuntungan 10% Rp 34,893
Total = Jumlah+(Keuntungan 10%) Rp 383,821

1 UNIT PEMBUATAN BAK KONTROL Rp 1,062,000


Material bh 1.000 Rp 750,000.00 Rp 750,000
Tukang hari 0.571 Rp 145,000.00 Rp 82,857
Kepala Tukang hari 0.571 Rp 155,000.00 Rp 88,571
Mandor hari 0.286 Rp 155,000.00 Rp 44,286
Jumlah Rp 965,714
Keuntungan 10% Rp 96,571
Total = Jumlah+(Keuntungan 10%) Rp 1,062,286

1 UNIT PEMBUATAN SUMUR RESAPAN Rp 4,087,000


SUMUR RESAPAN bh 1.000 Rp 3,500,000.00 Rp 3,500,000
Tukang hari 0.571 Rp 145,000.00 Rp 82,857
Kepala Tukang hari 0.571 Rp 155,000.00 Rp 88,571
Mandor hari 0.286 Rp 155,000.00 Rp 44,286
Jumlah Rp 3,715,714
Keuntungan 10% Rp 371,571
Total = Jumlah+(Keuntungan 10%) Rp 4,087,286
1 UNIT Pengadaan & Pemasangan AAV Rp 1,659,000
AAV bh 1.000 Rp 1,400,000.00 Rp 1,400,000
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Mandor hari 0.143 Rp 155,000.00 Rp 22,143
Jumlah Rp 1,507,857
Keuntungan 10% Rp 150,786
Total = Jumlah+(Keuntungan 10%) Rp 1,658,643
1 UNIT Pengadaan & Pemasangan Vent Cap / out Rp 415,000
Vent Cap PVC dia.2 " bh 1.000 Rp 350,000.00 Rp 350,000
Tukang hari 0.071 Rp 145,000.00 Rp 10,357
Kepala Tukang hari 0.071 Rp 155,000.00 Rp 11,071
Mandor hari 0.036 Rp 155,000.00 Rp 5,536
Jumlah Rp 376,964
Keuntungan 10% Rp 37,696
Total = Jumlah+(Keuntungan 10%) Rp 414,661

PEKERJAAN AIR PANAS

1 UNIT Pengadaan & Pemasangan Heat Pump Rp 3,880,000


Heat Pump kap. 21 kW bh 1.000 Rp 3,000,000.00 Rp 3,000,000
Alat Bantu bh 1.000 Rp 150,000.00 Rp 150,000
Upah Pasang :
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Kepala tukang hari 1.000 Rp 155,000.00 Rp 155,000
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Jumlah Rp 3,527,500
Keuntungan 10% Rp 352,750
Total = Jumlah+(Keuntungan 10%) Rp 3,880,250

Analisa Harga Satuan Pekerjaan MEP - page 147 of 215


NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
1 UNIT Pengadaan & Pemasangan Pompa Heat Pump Rp 4,458,000
Pompa HP kapasitas : 3 m3/jam bh 1.000 Rp 3,500,000.00 Rp 3,500,000
Alat Bantu bh 1.000 Rp 175,000.00 Rp 175,000
Upah Pasang :
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Kepala tukang hari 1.000 Rp 155,000.00 Rp 155,000
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Jumlah Rp 4,052,500
Keuntungan 10% Rp 405,250
Total = Jumlah+(Keuntungan 10%) Rp 4,457,750

1 UNIT Pengadaan & Pemasangan Pompa Return Rp 3,592,000


Pompa Return bh 1.000 Rp 2,750,000.00 Rp 2,750,000
Alat Bantu bh 1.000 Rp 137,500.00 Rp 137,500
Upah Pasang :
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Kepala tukang hari 1.000 Rp 155,000.00 Rp 155,000
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Jumlah Rp 3,265,000
Keuntungan 10% Rp 326,500
Total = Jumlah+(Keuntungan 10%) Rp 3,591,500

1 UNIT Pengadaan & Pemasangan Pressure Tank 1000 liter Rp 666,000


Pressure Tank 1000 liter bh 1.000 Rp - Rp -
Alat Bantu bh 1.000 Rp - Rp -
Upah Pasang :
Tukang hari 1.500 Rp 145,000.00 Rp 217,500
Kepala tukang hari 1.500 Rp 155,000.00 Rp 232,500
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Jumlah Rp 605,000
Keuntungan 10% Rp 60,500
Total = Jumlah+(Keuntungan 10%) Rp 665,500

1 UNIT Pengadaan & Pemasangan Electric Water Heater kapasitas : 50 Liter Rp 3,996,000
Electric Water Heater kapasitas : 50 Liter bh 1.000 Rp 3,100,000.00 Rp 3,100,000
Alat Bantu bh 1.000 Rp 155,000.00 Rp 155,000
Upah Pasang :
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Kepala tukang hari 1.000 Rp 155,000.00 Rp 155,000
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Jumlah Rp 3,632,500
Keuntungan 10% Rp 363,250
Total = Jumlah+(Keuntungan 10%) Rp 3,995,750
1 UNIT Pengadaan & Pemasangan Electric Water Heater kapasitas : 30 Liter Rp 3,072,000
Electric Water Heater kapasitas : 30 Liter bh 1.000 Rp 2,300,000.00 Rp 2,300,000
Alat Bantu bh 1.000 Rp 115,000.00 Rp 115,000
Upah Pasang :
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Kepala tukang hari 1.000 Rp 155,000.00 Rp 155,000
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Jumlah Rp 2,792,500
Keuntungan 10% Rp 279,250
Total = Jumlah+(Keuntungan 10%) Rp 3,071,750
1 M' Pengadaan & Pemasangan PIPA POLLYPROPELINE DIA. 1 1/2" / PN - 20 Rp 141,000
Polypropeline PN-20 dia. 1 1/2” Meter 1.000 Rp 92,500.00 Rp 92,500
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 27,750.00 Rp 27,750
Tukang hari 0.021 Rp 145,000.00 Rp 3,107
Kepala tukang hari 0.021 Rp 155,000.00 Rp 3,321
Mandor hari 0.011 Rp 155,000.00 Rp 1,661
Jumlah Rp 128,339
Keuntungan 10% Rp 12,834
Total = Jumlah+(Keuntungan 10%) Rp 141,173

1 M' Pengadaan & Pemasangan PIPA POLLYPROPELINE DIA. 1/2" PN-20 Rp 31,000
Pipa Polypropeline PN-20, dia. 1/2” Meter 1.000 Rp 15,500.00 Rp 15,500
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 4,650.00 Rp 4,650
Tukang hari 0.021 Rp 145,000.00 Rp 3,107
Kepala tukang hari 0.021 Rp 155,000.00 Rp 3,321
Mandor hari 0.011 Rp 155,000.00 Rp 1,661
Jumlah Rp 28,239
Keuntungan 10% Rp 2,824
Total = Jumlah+(Keuntungan 10%) Rp 31,063

1 M' Pengadaan & Pemasangan PIPA POLLYPROPELINE DIA. 3/4" / PN-20 Rp 43,000
Polypropeline dia. 3/4” Meter 1.000 Rp 23,800.00 Rp 23,800
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 7,140.00 Rp 7,140
Tukang hari 0.021 Rp 145,000.00 Rp 3,107
Kepala tukang hari 0.021 Rp 155,000.00 Rp 3,321
Mandor hari 0.011 Rp 155,000.00 Rp 1,661
Jumlah Rp 39,029
Keuntungan 10% Rp 3,903
Total = Jumlah+(Keuntungan 10%) Rp 42,932

1 M' Pengadaan & Pemasangan PIPA POLLYPROPELINE DIA. 1" / PN - 20 Rp 64,000


Polypropeline dia. 1” Meter 1.000 Rp 38,800.00 Rp 38,800
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 11,640.00 Rp 11,640
Tukang hari 0.021 Rp 145,000.00 Rp 3,107
Kepala tukang hari 0.021 Rp 155,000.00 Rp 3,321
Analisa Harga Satuan Pekerjaan MEP - page 148 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Mandor hari 0.011 Rp 155,000.00 Rp 1,661
Jumlah Rp 58,529
Keuntungan 10% Rp 5,853
Total = Jumlah+(Keuntungan 10%) Rp 64,382

1 M' Pengadaan & Pemasangan PIPA POLLYPROPELINE DIA. 1 1/4" / PN - 20 Rp 95,000


Polypropeline dia. 1 1/4 ” Meter 1.000 Rp 60,000.00 Rp 60,000
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 18,000.00 Rp 18,000
Tukang hari 0.021 Rp 145,000.00 Rp 3,107
Kepala tukang hari 0.021 Rp 155,000.00 Rp 3,321
Mandor hari 0.011 Rp 155,000.00 Rp 1,661
Jumlah Rp 86,089
Keuntungan 10% Rp 8,609
Total = Jumlah+(Keuntungan 10%) Rp 94,698

1 M' Pengadaan & Pemasangan PIPA POLLYPROPELINE DIA. 1 1/2" / PN - 20 Rp 141,000


Polypropeline dia. 1 1/2” Meter 1.000 Rp 92,500.00 Rp 92,500
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 27,750.00 Rp 27,750
Tukang hari 0.021 Rp 145,000.00 Rp 3,107
Kepala tukang hari 0.021 Rp 155,000.00 Rp 3,321
Mandor hari 0.011 Rp 155,000.00 Rp 1,661
Jumlah Rp 128,339
Keuntungan 10% Rp 12,834
Total = Jumlah+(Keuntungan 10%) Rp 141,173

1 M' Pengadaan & Pemasangan PIPA POLLYPROPELINE DIA. 2" / PN - 20 Rp 220,000


Polypropeline dia. 2 ” Meter 1.000 Rp 147,500.00 Rp 147,500
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 44,250.00 Rp 44,250
Tukang hari 0.021 Rp 145,000.00 Rp 3,107
Kepala tukang hari 0.021 Rp 155,000.00 Rp 3,321
Mandor hari 0.011 Rp 155,000.00 Rp 1,661
Jumlah Rp 199,839
Keuntungan 10% Rp 19,984
Total = Jumlah+(Keuntungan 10%) Rp 219,823

PEKERJAAN HYDRANT & SPRINKLER

1 UNIT Pengadaan & Pemasangan Diesel Fire Pump kapasitas 1000 Usgpm Head 100 Meter Rp 372,152,000
Diesel Fire Pump kapasitas 1000 Usgpm Head 100 Meter bh 1.000 Rp 330,500,000.00 Rp 330,500,000
Alat Bantu bh 1.000 Rp 6,610,000.00 Rp 6,610,000
Upah Pasang :
Tukang hari 3.000 Rp 145,000.00 Rp 435,000
Kepala tukang hari 3.000 Rp 155,000.00 Rp 465,000
Mandor hari 2.000 Rp 155,000.00 Rp 310,000
Jumlah Rp 338,320,000
Keuntungan 10% Rp 33,832,000
Total = Jumlah+(Keuntungan 10%) Rp 372,152,000

1 UNIT Pengadaan & Pemasangan Electric Fire Pump kapasitas 1000 Usgpm Head 100 Meter Rp 280,148,000
Electric Fire Pump kapasitas 1000 Usgpm Head 100 Meter bh 1.000 Rp 248,500,000.00 Rp 248,500,000
Alat Bantu bh 1.000 Rp 4,970,000.00 Rp 4,970,000
Upah Pasang :
Tukang hari 3.000 Rp 145,000.00 Rp 435,000
Kepala tukang hari 3.000 Rp 155,000.00 Rp 465,000
Mandor hari 2.000 Rp 155,000.00 Rp 310,000
Jumlah Rp 254,680,000
Keuntungan 10% Rp 25,468,000
Total = Jumlah+(Keuntungan 10%) Rp 280,148,000

1 UNIT Pengadaan & Pemasangan Jockey Fire Pump kapasitas 50 Gpm Head 150 Meter Rp 48,100,000
Jockey Fire Pump kapasitas 100 Lpm Head 105 Meter bh 1.000 Rp 42,500,000.00 Rp 42,500,000
Alat Bantu bh 1.000 Rp 850,000.00 Rp 850,000
Upah Pasang :
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Kepala tukang hari 1.000 Rp 155,000.00 Rp 155,000
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Jumlah Rp 43,727,500
Keuntungan 10% Rp 4,372,750
Total = Jumlah+(Keuntungan 10%) Rp 48,100,250

1 UNIT Pengadaan & Pemasangan Diapraghma Tank Kap. 100 liter Rp 2,996,000
Diapraghma Tank Kap. 100 liter bh 1.000 Rp 2,300,000.00 Rp 2,300,000
Alat Bantu bh 1.000 Rp 46,000.00 Rp 46,000
Upah Pasang :
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Kepala tukang hari 1.000 Rp 155,000.00 Rp 155,000
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Jumlah Rp 2,723,500
Keuntungan 10% Rp 272,350
Total = Jumlah+(Keuntungan 10%) Rp 2,995,850
1 M' Pengadaan & Pemasangan PIPA BSP SCH.40 DIA. 3/4" Rp 60,000
PIPA BSP SCH.40 Dia. 3/4” Meter 1.000 Rp 28,680.00 Rp 28,680
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 7,170.00 Rp 7,170
Tukang hari 0.050 Rp 145,000.00 Rp 7,250
Kepala tukang hari 0.050 Rp 155,000.00 Rp 7,750
Mandor hari 0.025 Rp 155,000.00 Rp 3,875
Jumlah Rp 54,725
Keuntungan 10% Rp 5,473
Analisa Harga Satuan Pekerjaan MEP - page 149 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Total = Jumlah+(Keuntungan 10%) Rp 60,198

1 M' Pengadaan & Pemasangan PIPA BSP SCH.40 DIA. 1" Rp 79,000
PIPA BSP SCH.40 Dia. 1” Meter 1.000 Rp 42,600.00 Rp 42,600
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 10,650.00 Rp 10,650
Tukang hari 0.050 Rp 145,000.00 Rp 7,250
Kepala tukang hari 0.050 Rp 155,000.00 Rp 7,750
Mandor hari 0.025 Rp 155,000.00 Rp 3,875
Jumlah Rp 72,125
Keuntungan 10% Rp 7,213
Total = Jumlah+(Keuntungan 10%) Rp 79,338

1 M' Pengadaan & Pemasangan PIPA BSP SCH.40 DIA. 1 1/4" Rp 100,000
PIPA BSP SCH.40 Dia. 1 1/4” Meter 1.000 Rp 57,840.00 Rp 57,840
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 14,460.00 Rp 14,460
Tukang hari 0.050 Rp 145,000.00 Rp 7,250
Kepala tukang hari 0.050 Rp 155,000.00 Rp 7,750
Mandor hari 0.025 Rp 155,000.00 Rp 3,875
Jumlah Rp 91,175
Keuntungan 10% Rp 9,118
Total = Jumlah+(Keuntungan 10%) Rp 100,293

1 M' Pengadaan & Pemasangan PIPA BSP SCH.40 DIA. 1 1/2" Rp 121,000
PIPA BSP SCH.40 Dia. 1 1/2” Meter 1.000 Rp 72,600.00 Rp 72,600
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 18,150.00 Rp 18,150
Tukang hari 0.050 Rp 145,000.00 Rp 7,250
Kepala tukang hari 0.050 Rp 155,000.00 Rp 7,750
Mandor hari 0.025 Rp 155,000.00 Rp 3,875
Jumlah Rp 109,625
Keuntungan 10% Rp 10,963
Total = Jumlah+(Keuntungan 10%) Rp 120,588

1 M' Pengadaan & Pemasangan PIPA BSP SCH.40 DIA. 2" Rp 154,000
PIPA BSP SCH.40 Dia. 2” Meter 1.000 Rp 92,040.00 Rp 92,040
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 23,010.00 Rp 23,010
Tukang hari 0.067 Rp 145,000.00 Rp 9,667
Kepala tukang hari 0.067 Rp 155,000.00 Rp 10,333
Mandor hari 0.033 Rp 155,000.00 Rp 5,167
Jumlah Rp 140,217
Keuntungan 10% Rp 14,022
Total = Jumlah+(Keuntungan 10%) Rp 154,238

1 M' Pengadaan & Pemasangan PIPA BSP SCH.40 DIA. 2 1/2" Rp 231,000
PIPA BSP SCH. 40 Dia. 2 1/2” Meter 1.000 Rp 148,200.00 Rp 148,200
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 37,050.00 Rp 37,050
Tukang hari 0.067 Rp 145,000.00 Rp 9,667
Kepala tukang hari 0.067 Rp 155,000.00 Rp 10,333
Mandor hari 0.033 Rp 155,000.00 Rp 5,167
Jumlah Rp 210,417
Keuntungan 10% Rp 21,042
Total = Jumlah+(Keuntungan 10%) Rp 231,458

1 M' Pengadaan & Pemasangan PIPA BSP SCH.40 DIA. 3" Rp 299,000
PIPA BSP SCH. 40 Dia. 3” Meter 1.000 Rp 192,000.00 Rp 192,000
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 48,000.00 Rp 48,000
Tukang hari 0.083 Rp 145,000.00 Rp 12,083
Kepala tukang hari 0.083 Rp 155,000.00 Rp 12,917
Mandor hari 0.042 Rp 155,000.00 Rp 6,458
Jumlah Rp 271,458
Keuntungan 10% Rp 27,146
Total = Jumlah+(Keuntungan 10%) Rp 298,604

1 M' Pengadaan & Pemasangan PIPA BSP SCH.40 DIA. 4" Rp 435,000
PIPA BSP SCH.40 Dia. 4” Meter 1.000 Rp 276,000.00 Rp 276,000
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 69,000.00 Rp 69,000
Tukang hari 0.133 Rp 145,000.00 Rp 19,333
Kepala tukang hari 0.133 Rp 155,000.00 Rp 20,667
Mandor hari 0.067 Rp 155,000.00 Rp 10,333
Jumlah Rp 395,333
Keuntungan 10% Rp 39,533
Total = Jumlah+(Keuntungan 10%) Rp 434,867

1 M' Pengadaan & Pemasangan PIPA BSP SCH.40 DIA. 5" Rp 583,000
PIPA BSP SCH.40 Dia. 5” Meter 1.000 Rp 384,000.00 Rp 384,000
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 96,000.00 Rp 96,000
Tukang hari 0.133 Rp 145,000.00 Rp 19,333
Kepala tukang hari 0.133 Rp 155,000.00 Rp 20,667
Mandor hari 0.067 Rp 155,000.00 Rp 10,333
Jumlah Rp 530,333
Keuntungan 10% Rp 53,033
Total = Jumlah+(Keuntungan 10%) Rp 583,367

1 M' Pengadaan & Pemasangan PIPA BSP SCH.40 DIA. 6" Rp 710,000
PIPA BSP SCH. Dia. 6” Meter 1.000 Rp 476,400.00 Rp 476,400
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 119,100.00 Rp 119,100
Tukang hari 0.133 Rp 145,000.00 Rp 19,333
Kepala tukang hari 0.133 Rp 155,000.00 Rp 20,667
Mandor hari 0.067 Rp 155,000.00 Rp 10,333
Analisa Harga Satuan Pekerjaan MEP - page 150 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Jumlah Rp 645,833
Keuntungan 10% Rp 64,583
Total = Jumlah+(Keuntungan 10%) Rp 710,417

1 M' Pengadaan & Pemasangan PIPA BSP SCH.40 DIA. 8" Rp 1,130,000
PIPA BSP SCH.40 Dia. 8” Meter 1.000 Rp 781,200.00 Rp 781,200
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 195,300.00 Rp 195,300
Tukang hari 0.133 Rp 145,000.00 Rp 19,333
Kepala tukang hari 0.133 Rp 155,000.00 Rp 20,667
Mandor hari 0.067 Rp 155,000.00 Rp 10,333
Jumlah Rp 1,026,833
Keuntungan 10% Rp 102,683
Total = Jumlah+(Keuntungan 10%) Rp 1,129,517

1 BH Pengadaan & Pemasangan GATE VALVE DIA.25 MM / 20 K Rp 4,244,000


GATE VALVE DIA.25 MM / 20 K bh 1.000 Rp 3,750,000.00 Rp 3,750,000
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Mandor hari 0.143 Rp 155,000.00 Rp 22,143
Jumlah Rp 3,857,857
Keuntungan 10% Rp 385,786
Total = Jumlah+(Keuntungan 10%) Rp 4,243,643

1 BH Pengadaan & Pemasangan GATE VALVE DIA.40 MM / 20 K Rp 7,654,000


GATE VALVE DIA.40 MM / 20 K bh 1.000 Rp 6,850,000.00 Rp 6,850,000
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Mandor hari 0.143 Rp 155,000.00 Rp 22,143
Jumlah Rp 6,957,857
Keuntungan 10% Rp 695,786
Total = Jumlah+(Keuntungan 10%) Rp 7,653,643

1 BH Pengadaan & Pemasangan GATE VALVE DIA.50 MM / 20 K Rp 8,809,000


GATE VALVE DIA.50 MM / 20 K bh 1.000 Rp 7,900,000.00 Rp 7,900,000
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Mandor hari 0.143 Rp 155,000.00 Rp 22,143
Jumlah Rp 8,007,857
Keuntungan 10% Rp 800,786
Total = Jumlah+(Keuntungan 10%) Rp 8,808,643

1 BH Pengadaan & Pemasangan GATE VALVE DIA.65 MM / 20 K Rp 9,744,000


GATE VALVE DIA.65 MM / 20 K bh 1.000 Rp 8,750,000.00 Rp 8,750,000
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Mandor hari 0.143 Rp 155,000.00 Rp 22,143
Jumlah Rp 8,857,857
Keuntungan 10% Rp 885,786
Total = Jumlah+(Keuntungan 10%) Rp 9,743,643

1 BH Pengadaan & Pemasangan GATE VALVE DIA.80 MM / 20 K Rp 10,305,000


GATE VALVE DIA.80 MM / 20 K bh 1.000 Rp 9,260,000.00 Rp 9,260,000
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Mandor hari 0.143 Rp 155,000.00 Rp 22,143
Jumlah Rp 9,367,857
Keuntungan 10% Rp 936,786
Total = Jumlah+(Keuntungan 10%) Rp 10,304,643

1 BH Pengadaan & Pemasangan GATE VALVE DIA.100 MM / 20 K Rp 13,987,000


GATE VALVE DIA. 100 MM / 20 K bh 1.000 Rp 12,500,000.00 Rp 12,500,000
Tukang hari 0.571 Rp 145,000.00 Rp 82,857
Kepala Tukang hari 0.571 Rp 155,000.00 Rp 88,571
Mandor hari 0.286 Rp 155,000.00 Rp 44,286
Jumlah Rp 12,715,714
Keuntungan 10% Rp 1,271,571
Total = Jumlah+(Keuntungan 10%) Rp 13,987,286

1 BH Pengadaan & Pemasangan GATE VALVE DIA.150 MM / 20 K Rp 13,305,000


GATE VALVE DIA. 150 MM / 20 K bh 1.000 Rp 11,879,999.00 Rp 11,879,999
Tukang hari 0.571 Rp 145,000.00 Rp 82,857
Kepala Tukang hari 0.571 Rp 155,000.00 Rp 88,571
Mandor hari 0.286 Rp 155,000.00 Rp 44,286
Jumlah Rp 12,095,713
Keuntungan 10% Rp 1,209,571
Total = Jumlah+(Keuntungan 10%) Rp 13,305,285

1 BH Pengadaan & Pemasangan GATE VALVE DIA.200 MM / 20 K Rp 41,047,000


GATE VALVE DIA. 200MM / 20 K bh 1.000 Rp 37,100,000.00 Rp 37,100,000
Tukang hari 0.571 Rp 145,000.00 Rp 82,857
Kepala Tukang hari 0.571 Rp 155,000.00 Rp 88,571
Mandor hari 0.286 Rp 155,000.00 Rp 44,286
Jumlah Rp 37,315,714
Keuntungan 10% Rp 3,731,571
Total = Jumlah+(Keuntungan 10%) Rp 41,047,286

1 BH Pengadaan & Pemasangan INDICATING VALVE 100 MM Rp 1,887,000


Analisa Harga Satuan Pekerjaan MEP - page 151 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
INDICATING VALVE 100 MM bh 1.000 Rp 1,500,000.00 Rp 1,500,000
Tukang hari 0.571 Rp 145,000.00 Rp 82,857
Kepala Tukang hari 0.571 Rp 155,000.00 Rp 88,571
Mandor hari 0.286 Rp 155,000.00 Rp 44,286
Jumlah Rp 1,715,714
Keuntungan 10% Rp 171,571
Total = Jumlah+(Keuntungan 10%) Rp 1,887,286

1 BH Pengadaan & Pemasangan FLUSHING VALVE DIA. 25 MM Rp 4,244,000


INDICATING VALVE 25 MM bh 1.000 Rp 3,750,000.00 Rp 3,750,000
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Mandor hari 0.143 Rp 155,000.00 Rp 22,143
Jumlah Rp 3,857,857
Keuntungan 10% Rp 385,786
Total = Jumlah+(Keuntungan 10%) Rp 4,243,643
1 BH Pengadaan & Pemasangan Pressure Switch Rp 2,704,000
Pressure Switch bh 1.000 Rp 2,350,000.00 Rp 2,350,000
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Mandor hari 0.143 Rp 155,000.00 Rp 22,143
Jumlah Rp 2,457,857
Keuntungan 10% Rp 245,786
Total = Jumlah+(Keuntungan 10%) Rp 2,703,643

1 BH Pengadaan & Pemasangan PILLAR HYDRANT Rp 2,120,000


PILLAR HYDRANT bh 1.000 Rp 1,550,000.00 Rp 1,550,000
Hose Cabinet bh 1.000 Rp -
Pondasi bh 1.000 Rp -
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Kepala Tukang hari 1.000 Rp 155,000.00 Rp 155,000
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Jumlah Rp 1,927,500
Keuntungan 10% Rp 192,750
Total = Jumlah+(Keuntungan 10%) Rp 2,120,250

1 BH Pengadaan & Pemasangan SIAMISE CONNECTION Rp 3,303,000


Pengadaan & Pemasangan SIAMISE CONNECTION bh 1.000 Rp 2,625,000.00 Rp 2,625,000
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Kepala Tukang hari 1.000 Rp 155,000.00 Rp 155,000
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Jumlah Rp 3,002,500
Keuntungan 10% Rp 300,250
Total = Jumlah+(Keuntungan 10%) Rp 3,302,750

1 BH Pengadaan & Pemasangan FIRE HOUSE CABINET / FHC ( INDOOR ) Rp 5,352,000


Fire House Cabinet ( Indoor ) bh 1.000 Rp 4,650,000.00 Rp 4,650,000
Control valve diameter 65 mm bh - Rp 2,950,000.00 Rp -
Tukang hari 0.571 Rp 145,000.00 Rp 82,857
Kepala Tukang hari 0.571 Rp 155,000.00 Rp 88,571
Mandor hari 0.286 Rp 155,000.00 Rp 44,286
Jumlah Rp 4,865,714
Keuntungan 10% Rp 486,571
Total = Jumlah+(Keuntungan 10%) Rp 5,352,286

1 BH Pengadaan & Pemasangan FIRE EXTINGUISHER 6 KG Rp 1,769,000


Fire Extinguisher 6 Kg ( Dry Chemical Multy Purpose ) bh 1.000 Rp 1,250,000.00 Rp 1,250,000
Dudukan Fire Extinguisher bh 1.000 Rp 250,000.00 Rp 250,000
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Mandor hari 0.143 Rp 155,000.00 Rp 22,143
Jumlah Rp 1,607,857
Keuntungan 10% Rp 160,786
Total = Jumlah+(Keuntungan 10%) Rp 1,768,643

1 BH Pengadaan & Pemasangan HEAD SPRINKLER Rp 369,000


Head Sprinkler bh 1.000 Rp 120,000.00 Rp 120,000
Tukang hari 0.571 Rp 145,000.00 Rp 82,857
Kepala Tukang hari 0.571 Rp 155,000.00 Rp 88,571
Mandor hari 0.286 Rp 155,000.00 Rp 44,286
Jumlah Rp 335,714
Keuntungan 10% Rp 33,571
Total = Jumlah+(Keuntungan 10%) Rp 369,286

1 BH Pengadaan & Pemasangan BAK & VALVE DIA.100 MM / 20 K Rp 14,482,000


BAK KONTROL bh 1.000 Rp 450,000.00 Rp 450,000
GATE VALVE DIA. 100 MM / 20 K bh 1.000 Rp 12,500,000.00 Rp 12,500,000
Tukang hari 0.571 Rp 145,000.00 Rp 82,857
Kepala Tukang hari 0.571 Rp 155,000.00 Rp 88,571
Mandor hari 0.286 Rp 155,000.00 Rp 44,286
Jumlah Rp 13,165,714
Keuntungan 10% Rp 1,316,571
Total = Jumlah+(Keuntungan 10%) Rp 14,482,286

1 UNIT Pengadaan & Pemasangan FLEXIBLE JOINT DIA.200 MM'/ 20KG Rp 3,636,000
Pengadaan & Pemasangan FLEXIBLE JOINT DIA.200 MM'/ 20KG bh 1.000 Rp 2,900,000.00 Rp 2,900,000
Alat Bantu bh 1.000 Rp 145,000.00 Rp 145,000
Upah Pasang :
Analisa Harga Satuan Pekerjaan MEP - page 152 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Tukang hari 0.571 Rp 145,000.00 Rp 82,857
Kepala Tukang hari 0.571 Rp 155,000.00 Rp 88,571
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Jumlah Rp 3,305,000
Keuntungan 10% Rp 330,500
Total = Jumlah+(Keuntungan 10%) Rp 3,635,500

1 UNIT Pengadaan & Pemasangan FLEXIBLE JOINT DIA.150 MM' / 20KG Rp 2,293,000
Pengadaan & Pemasangan FLEXIBLE JOINT DIA.150 MM' / 20KG bh 1.000 Rp 1,780,000.00 Rp 1,780,000
Alat Bantu bh 1.000 Rp 89,000.00 Rp 89,000
Upah Pasang :
Tukang hari 0.571 Rp 145,000.00 Rp 82,857
Kepala Tukang hari 0.571 Rp 155,000.00 Rp 88,571
Mandor hari 0.286 Rp 155,000.00 Rp 44,286
Jumlah Rp 2,084,714
Keuntungan 10% Rp 208,471
Total = Jumlah+(Keuntungan 10%) Rp 2,293,186

1 UNIT Pengadaan & Pemasangan FLEXIBLE JOINT DIA.100 MM' / 20KG Rp 1,219,000
Pengadaan & Pemasangan FLEXIBLE JOINT DIA.100 MM' / 20KG bh 1.000 Rp 850,000.00 Rp 850,000
Alat Bantu bh 1.000 Rp 42,500.00 Rp 42,500
Upah Pasang :
Tukang hari 0.571 Rp 145,000.00 Rp 82,857
Kepala Tukang hari 0.571 Rp 155,000.00 Rp 88,571
Mandor hari 0.286 Rp 155,000.00 Rp 44,286
Jumlah Rp 1,108,214
Keuntungan 10% Rp 110,821
Total = Jumlah+(Keuntungan 10%) Rp 1,219,036

1 UNIT Pengadaan & Pemasangan FLEXIBLE JOINT DIA.80 MM' / 20KG Rp 904,000
Pengadaan & Pemasangan FLEXIBLE JOINT DIA.80 MM' / 20KG bh 1.000 Rp 680,000.00 Rp 680,000
Alat Bantu bh 1.000 Rp 34,000.00 Rp 34,000
Upah Pasang :
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Mandor hari 0.143 Rp 155,000.00 Rp 22,143
Jumlah Rp 821,857
Keuntungan 10% Rp 82,186
Total = Jumlah+(Keuntungan 10%) Rp 904,043

1 UNIT Pengadaan & Pemasangan FLEXIBLE JOINT DIA.65 MM' / 20KG Rp 754,000
Pengadaan & Pemasangan FLEXIBLE JOINT DIA.65 MM' / 20KG bh 1.000 Rp 550,000.00 Rp 550,000
Alat Bantu bh 1.000 Rp 27,500.00 Rp 27,500
Upah Pasang :
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Mandor hari 0.143 Rp 155,000.00 Rp 22,143
Jumlah Rp 685,357
Keuntungan 10% Rp 68,536
Total = Jumlah+(Keuntungan 10%) Rp 753,893

1 UNIT Pengadaan & Pemasangan FLEXIBLE JOINT DIA.50 MM' / 20KG Rp 638,000
Pengadaan & Pemasangan FLEXIBLE JOINT DIA.50 MM' / 20KG bh 1.000 Rp 450,000.00 Rp 450,000
Alat Bantu bh 1.000 Rp 22,500.00 Rp 22,500
Upah Pasang :
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Mandor hari 0.143 Rp 155,000.00 Rp 22,143
Jumlah Rp 580,357
Keuntungan 10% Rp 58,036
Total = Jumlah+(Keuntungan 10%) Rp 638,393

1 UNIT Pengadaan & Pemasangan FLEXIBLE JOINT DIA.40 MM' / 20KG Rp 523,000
Pengadaan & Pemasangan FLEXIBLE JOINT DIA.40 MM' / 20KG bh 1.000 Rp 350,000.00 Rp 350,000
Alat Bantu bh 1.000 Rp 17,500.00 Rp 17,500
Upah Pasang :
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Mandor hari 0.143 Rp 155,000.00 Rp 22,143
Jumlah Rp 475,357
Keuntungan 10% Rp 47,536
Total = Jumlah+(Keuntungan 10%) Rp 522,893

1 UNIT Pengadaan & Pemasangan FLEXIBLE JOINT DIA.32 MM' / 20KG Rp 396,000
Pengadaan & Pemasangan FLEXIBLE JOINT DIA.32 MM' / 20KG bh 1.000 Rp 240,000.00 Rp 240,000
Alat Bantu bh 1.000 Rp 12,000.00 Rp 12,000
Upah Pasang :
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Mandor hari 0.143 Rp 155,000.00 Rp 22,143
Jumlah Rp 359,857
Keuntungan 10% Rp 35,986
Total = Jumlah+(Keuntungan 10%) Rp 395,843

1 UNIT Pengadaan & Pemasangan FLEXIBLE JOINT DIA.25 MM' / 20KG Rp 338,000
Pengadaan & Pemasangan FLEXIBLE JOINT DIA.25 MM' / 20KG bh 1.000 Rp 190,000.00 Rp 190,000
Alat Bantu bh 1.000 Rp 9,500.00 Rp 9,500
Upah Pasang :
Analisa Harga Satuan Pekerjaan MEP - page 153 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Mandor hari 0.143 Rp 155,000.00 Rp 22,143
Jumlah Rp 307,357
Keuntungan 10% Rp 30,736
Total = Jumlah+(Keuntungan 10%) Rp 338,093

1 UNIT Pengadaan & Pemasangan CHECK VALVE DIA.150 MM' / 20 Kg Rp 34,627,000


Pengadaan & Pemasangan CHECK VALVE DIA.150 MM' / 20 Kg bh 1.000 Rp 29,775,000.00 Rp 29,775,000
Alat Bantu bh 1.000 Rp 1,488,750.00 Rp 1,488,750
Upah Pasang :
Tukang hari 0.571 Rp 145,000.00 Rp 82,857
Kepala Tukang hari 0.571 Rp 155,000.00 Rp 88,571
Mandor hari 0.286 Rp 155,000.00 Rp 44,286
Jumlah Rp 31,479,464
Keuntungan 10% Rp 3,147,946
Total = Jumlah+(Keuntungan 10%) Rp 34,627,411

1 UNIT Pengadaan & Pemasangan CHECK VALVE DIA.100 MM' / 20 Kg Rp 21,556,000


Pengadaan & Pemasangan CHECK VALVE DIA.100 MM' / 20 Kg bh 1.000 Rp 18,458,000.00 Rp 18,458,000
Alat Bantu bh 1.000 Rp 922,900.00 Rp 922,900
Upah Pasang :
Tukang hari 0.571 Rp 145,000.00 Rp 82,857
Kepala Tukang hari 0.571 Rp 155,000.00 Rp 88,571
Mandor hari 0.286 Rp 155,000.00 Rp 44,286
Jumlah Rp 19,596,614
Keuntungan 10% Rp 1,959,661
Total = Jumlah+(Keuntungan 10%) Rp 21,556,276

1 UNIT Pengadaan & Pemasangan CHECK VALVE DIA.65 MM' / 20 Kg Rp 13,470,000


Pengadaan & Pemasangan CHECK VALVE DIA.65 MM' / 20 Kg bh 1.000 Rp 11,560,000.00 Rp 11,560,000
Alat Bantu bh 1.000 Rp 578,000.00 Rp 578,000
Upah Pasang :
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Mandor hari 0.143 Rp 155,000.00 Rp 22,143
Jumlah Rp 12,245,857
Keuntungan 10% Rp 1,224,586
Total = Jumlah+(Keuntungan 10%) Rp 13,470,443

1 UNIT Pengadaan & Pemasangan CHECK VALVE DIA.50 MM' / 20 Kg Rp 4,623,000


Pengadaan & Pemasangan CHECK VALVE DIA.50 MM' / 20 Kg bh 1.000 Rp 3,900,000.00 Rp 3,900,000
Alat Bantu bh 1.000 Rp 195,000.00 Rp 195,000
Upah Pasang :
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Mandor hari 0.143 Rp 155,000.00 Rp 22,143
Jumlah Rp 4,202,857
Keuntungan 10% Rp 420,286
Total = Jumlah+(Keuntungan 10%) Rp 4,623,143

1 UNIT Pengadaan & Pemasangan CHECK VALVE DIA.25 MM' / 20 Kg Rp 2,717,000


Pengadaan & Pemasangan CHECK VALVE DIA.25 MM' / 20 Kg bh 1.000 Rp 2,250,000.00 Rp 2,250,000
Alat Bantu bh 1.000 Rp 112,500.00 Rp 112,500
Upah Pasang :
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Mandor hari 0.143 Rp 155,000.00 Rp 22,143
Jumlah Rp 2,470,357
Keuntungan 10% Rp 247,036
Total = Jumlah+(Keuntungan 10%) Rp 2,717,393

1 UNIT Pengadaan & Pemasangan MCV DIAMETER 150 MM Rp 9,493,000


Pengadaan & Pemasangan MCV DIAMETER 150 MM bh 1.000 Rp 7,500,000.00 Rp 7,500,000
Alat Bantu bh 1.000 Rp 375,000.00 Rp 375,000
Upah Pasang :
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Jumlah Rp 8,630,000
Keuntungan 10% Rp 863,000
Total = Jumlah+(Keuntungan 10%) Rp 9,493,000

1 UNIT Pengadaan & Pemasangan BCV DIAMETER 100 MM Rp 12,958,000


Pengadaan & Pemasangan BCV DIAMETER 100 MM bh 1.000 Rp 10,500,000.00 Rp 10,500,000
Alat Bantu bh 1.000 Rp 525,000.00 Rp 525,000
Upah Pasang :
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Jumlah Rp 11,780,000
Keuntungan 10% Rp 1,178,000
Total = Jumlah+(Keuntungan 10%) Rp 12,958,000

1 UNIT Pengadaan & Pemasangan BCV DIAMETER 80 MM Rp 9,493,000


Pengadaan & Pemasangan BCV DIAMETER 80 MM bh 1.000 Rp 7,500,000.00 Rp 7,500,000
Alat Bantu bh 1.000 Rp 375,000.00 Rp 375,000
Upah Pasang :
Analisa Harga Satuan Pekerjaan MEP - page 154 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Jumlah Rp 8,630,000
Keuntungan 10% Rp 863,000
Total = Jumlah+(Keuntungan 10%) Rp 9,493,000
1 UNIT Pengadaan & Pemasangan PRV Rp 21,390,000
Pengadaan & Pemasangan PRV dia. 6" bh 1.000 Rp 17,800,000.00 Rp 17,800,000
Alat Bantu bh 1.000 Rp 890,000.00 Rp 890,000
Upah Pasang :
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Jumlah Rp 19,445,000
Keuntungan 10% Rp 1,944,500
Total = Jumlah+(Keuntungan 10%) Rp 21,389,500

1 SET Pengadaan & Pemasangan Fire Suspression di ruamg OK Rp -


IP FLOW
3 Unit Cylinder Fire Suspression @ 50 kG lot 1.000 Rp -
lengkap :
Pilot Cylinder
Selector Valve
Pressure Awitch
Nozle
Bracket Matrix
Detection lot 1.000 Rp -
Realising Control Panel
Photo Electric Smoke Detector
Laser Smoke Detector
Alarm Bell
Horn complite with strobo light
Manual Call Point
Evacuate sign lamp
Gas Discharge sign Lamp
Junction Box with module
Instalasi
Jumlah Rp -
Keuntungan 10% Rp -
Total = Jumlah+(Keuntungan 10%) Rp -

PEKERJAAN MEDICAL GAS

1 BH Pengadaan & Pemasangan sentral Medical Vacum Pump System ( V ) 2 x 3,7 kW Rp 282,706,000
Medical Gas Vacuum Pump System ( V ) 2 x 3,7 kW bh 1.000 Rp 250,000,000.00 Rp 250,000,000
Alat bantu & penunjang Ls 1.000 Rp 6,250,000.00 Rp 6,250,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Kepala tukang hari 2.000 Rp 155,000.00 Rp 310,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Jumlah Rp 257,005,000
Keuntungan 10% Rp 25,700,500
Total = Jumlah+(Keuntungan 10%) Rp 282,705,500

1 BH Pengadaan & Pemasangan sentral Medical Gas Oxigent (O) 2 x 10 Cyl Rp 151,756,000
Medical Gas Manifold Oxigen (O), 2x 10 Cyl. bh 1.000 Rp 133,858,800.00 Rp 133,858,800
Alat bantu & penunjang Ls 1.000 Rp 3,346,470.00 Rp 3,346,470
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Kepala tukang hari 2.000 Rp 155,000.00 Rp 310,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Jumlah Rp 137,960,270
Keuntungan 10% Rp 13,796,027
Total = Jumlah+(Keuntungan 10%) Rp 151,756,297

1 BH Pengadaan & Pemasangan sentral Medical Gas Nitrous Oxude (N) 2 x 2 Cyl Rp 831,000
Medical Gas Manifold Nitrous Oxside (N), 2x2 Cyl. bh 1.000 Rp - Rp -
Alat bantu & penunjang Ls 1.000 Rp - Rp -
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Kepala tukang hari 2.000 Rp 155,000.00 Rp 310,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Jumlah Rp 755,000
Keuntungan 10% Rp 75,500
Total = Jumlah+(Keuntungan 10%) Rp 830,500

1 BH Pengadaan & Pemasangan sentral Medical Gas Compressed Air System (CA ) 2 x 7,5 kW Rp 346,748,000
Medical Gas Compressed Air system (A), 2x7.5 kW bh 1.000 Rp 306,800,000.00 Rp 306,800,000
Alat bantu & penunjang Ls 1.000 Rp 7,670,000.00 Rp 7,670,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Kepala tukang hari 2.000 Rp 155,000.00 Rp 310,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Jumlah Rp 315,225,000
Keuntungan 10% Rp 31,522,500
Total = Jumlah+(Keuntungan 10%) Rp 346,747,500
1 BH Pengadaan & Pemasangan Figtial Rp 967,000
Figtail bh 1.000 Rp 750,000.00 Rp 750,000
Alat bantu & penunjang Ls 1.000 Rp 75,000.00 Rp 75,000
Tukang hari 0.143 Rp 145,000.00 Rp 20,714
Kepala tukang hari 0.143 Rp 155,000.00 Rp 22,143
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Analisa Harga Satuan Pekerjaan MEP - page 155 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Jumlah Rp 878,929
Keuntungan 10% Rp 87,893
Total = Jumlah+(Keuntungan 10%) Rp 966,821
1 BH Pengadaan & Pemasangan Gate Valve type K Lead Copper Tube Rp 1,845,000
Gate valve bh 1.000 Rp 1,500,000.00 Rp 1,500,000
Alat bantu & penunjang Ls 1.000 Rp 150,000.00 Rp 150,000
Tukang hari 0.071 Rp 145,000.00 Rp 10,357
Kepala tukang hari 0.071 Rp 155,000.00 Rp 11,071
Mandor hari 0.036 Rp 155,000.00 Rp 5,536
Jumlah Rp 1,676,964
Keuntungan 10% Rp 167,696
Total = Jumlah+(Keuntungan 10%) Rp 1,844,661
1 BH Pengadaan & Pemasangan Ball valve dia. 1/2 " Rp 4,265,000
Ball valve dia. 1/2 " bh 1.000 Rp 3,500,000.00 Rp 3,500,000
Alat bantu & penunjang Ls 1.000 Rp 350,000.00 Rp 350,000
Tukang hari 0.071 Rp 145,000.00 Rp 10,357
Kepala tukang hari 0.071 Rp 155,000.00 Rp 11,071
Mandor hari 0.036 Rp 155,000.00 Rp 5,536
Jumlah Rp 3,876,964
Keuntungan 10% Rp 387,696
Total = Jumlah+(Keuntungan 10%) Rp 4,264,661

1 BH Pengadaan & Pemasangan Ball valve dia. 1 " Rp 3,660,000


Ball valve dia. 1 " bh 1.000 Rp 3,000,000.00 Rp 3,000,000
Alat bantu & penunjang Ls 1.000 Rp 300,000.00 Rp 300,000
Tukang hari 0.071 Rp 145,000.00 Rp 10,357
Kepala tukang hari 0.071 Rp 155,000.00 Rp 11,071
Mandor hari 0.036 Rp 155,000.00 Rp 5,536
Jumlah Rp 3,326,964
Keuntungan 10% Rp 332,696
Total = Jumlah+(Keuntungan 10%) Rp 3,659,661

1 BH Pengadaan & Pemasangan Medical Gas Wall Mounted Outlet Oxygen (O) Rp 119,000
Pengadaan & Pemasangan Medical Gas Wall Mounted Outlet Oxygen (O) bh 1.000 Rp - Rp -
Alat bantu & penunjang Ls 1.000 Rp - Rp -
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Kepala tukang hari 0.286 Rp 155,000.00 Rp 44,286
Mandor hari 0.143 Rp 155,000.00 Rp 22,143
Jumlah Rp 107,857
Keuntungan 10% Rp 10,786
Total = Jumlah+(Keuntungan 10%) Rp 118,643

1 BH Pengadaan & Pemasangan Medical Gas Wall Vacum Outlet (V ) Rp 119,000


Pengadaan & Pemasangan Medical Gas Wall Mounted Outlet Vacuum (V) bh 1.000 Rp - Rp -
Alat bantu & penunjang Ls 1.000 Rp - Rp -
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Kepala tukang hari 0.286 Rp 155,000.00 Rp 44,286
Mandor hari 0.143 Rp 155,000.00 Rp 22,143
Jumlah Rp 107,857
Keuntungan 10% Rp 10,786
Total = Jumlah+(Keuntungan 10%) Rp 118,643

1 BH Pengadaan & Pemasangan Medical Gas Wall Mounted Outlet Nitrous Oxid (N) Rp 119,000
Pengadaan & Pemasangan Medical Gas Wall Mounted Outlet Nitrous Oxid (N)bh 1.000 Rp - Rp -
Alat bantu & penunjang Ls 1.000 Rp - Rp -
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Kepala tukang hari 0.286 Rp 155,000.00 Rp 44,286
Mandor hari 0.143 Rp 155,000.00 Rp 22,143
Jumlah Rp 107,857
Keuntungan 10% Rp 10,786
Total = Jumlah+(Keuntungan 10%) Rp 118,643

1 BH Pengadaan & Pemasangan Medical Gas Wall Mounted Outlet Compressed Air (CA) Rp 118,643
Pengadaan & Pemasangan Medical Gas Wall Mounted Outlet Cpmpressed Airbh
(CA) 1.000 Rp - Rp -
Alat bantu & penunjang Ls 1.000 Rp - Rp -
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Kepala tukang hari 0.286 Rp 155,000.00 Rp 44,286
Mandor hari 0.143 Rp 155,000.00 Rp 22,143
Jumlah Rp 107,857
Keuntungan 10% Rp 10,786
Total = Jumlah+(Keuntungan 10%) Rp 118,643

1 BH Pengadaan & Pemasangan Zone Valve 1 Gas (O) Rp 9,665,000


Pengadaan & Pemasangan Zone Valve 1 Gas (O) bh 1.000 Rp 7,500,000.00 Rp 7,500,000
Alat bantu & penunjang Ls 1.000 Rp 1,125,000.00 Rp 1,125,000
Tukang hari 0.429 Rp 145,000.00 Rp 62,143
Kepala tukang hari 0.429 Rp 155,000.00 Rp 66,429
Mandor hari 0.214 Rp 155,000.00 Rp 33,214
Jumlah Rp 8,786,786
Keuntungan 10% Rp 878,679
Total = Jumlah+(Keuntungan 10%) Rp 9,665,464

1 BH Pengadaan & Pemasangan Zone Valve 2 Gas (O, V) Rp 13,460,000


Pengadaan & Pemasangan Zone Valve 2 Gas (O, V) bh 1.000 Rp 10,500,000.00 Rp 10,500,000
Alat bantu & penunjang Ls 1.000 Rp 1,575,000.00 Rp 1,575,000
Tukang hari 0.429 Rp 145,000.00 Rp 62,143
Kepala tukang hari 0.429 Rp 155,000.00 Rp 66,429
Mandor hari 0.214 Rp 155,000.00 Rp 33,214
Analisa Harga Satuan Pekerjaan MEP - page 156 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Jumlah Rp 12,236,786
Keuntungan 10% Rp 1,223,679
Total = Jumlah+(Keuntungan 10%) Rp 13,460,464

1 BH Pengadaan & Pemasangan Zone Valve 3 Gas (O, V, CA) Rp 19,049,000


Pengadaan & Pemasangan Zone Valve 3 Gas (O, V, CA ) bh 1.000 Rp 14,917,500.00 Rp 14,917,500
Alat bantu & penunjang Ls 1.000 Rp 2,237,625.00 Rp 2,237,625
Tukang hari 0.429 Rp 145,000.00 Rp 62,143
Kepala tukang hari 0.429 Rp 155,000.00 Rp 66,429
Mandor hari 0.214 Rp 155,000.00 Rp 33,214
Jumlah Rp 17,316,911
Keuntungan 10% Rp 1,731,691
Total = Jumlah+(Keuntungan 10%) Rp 19,048,602

1 BH Pengadaan & Pemasangan Zone Valve 4 Gas (O, V, CA) Rp 22,315,000


Pengadaan & Pemasangan Zone Valve 4 Gas (O, V, CA ) bh 1.000 Rp 17,500,000.00 Rp 17,500,000
Alat bantu & penunjang Ls 1.000 Rp 2,625,000.00 Rp 2,625,000
Tukang hari 0.429 Rp 145,000.00 Rp 62,143
Kepala tukang hari 0.429 Rp 155,000.00 Rp 66,429
Mandor hari 0.214 Rp 155,000.00 Rp 33,214
Jumlah Rp 20,286,786
Keuntungan 10% Rp 2,028,679
Total = Jumlah+(Keuntungan 10%) Rp 22,315,464

1 BH Pengadaan & Pemasangan Area Alarm 1 Gas (O) Rp 11,975,000


Pengadaan & Pemasangan Area Alarm 1 Gas (O) bh 1.000 Rp 9,750,000.00 Rp 9,750,000
Alat bantu & penunjang Ls 1.000 Rp 975,000.00 Rp 975,000
Tukang hari 0.429 Rp 145,000.00 Rp 62,143
Kepala tukang hari 0.429 Rp 155,000.00 Rp 66,429
Mandor hari 0.214 Rp 155,000.00 Rp 33,214
Jumlah Rp 10,886,786
Keuntungan 10% Rp 1,088,679
Total = Jumlah+(Keuntungan 10%) Rp 11,975,464

1 BH Pengadaan & Pemasangan Area Alarm 2 Gas (O, V) Rp 15,605,000


Pengadaan & Pemasangan Area Alarm 2 Gas (O, V) bh 1.000 Rp 12,750,000.00 Rp 12,750,000
Alat bantu & penunjang Ls 1.000 Rp 1,275,000.00 Rp 1,275,000
Tukang hari 0.429 Rp 145,000.00 Rp 62,143
Kepala tukang hari 0.429 Rp 155,000.00 Rp 66,429
Mandor hari 0.214 Rp 155,000.00 Rp 33,214
Jumlah Rp 14,186,786
Keuntungan 10% Rp 1,418,679
Total = Jumlah+(Keuntungan 10%) Rp 15,605,464

1 BH Pengadaan & Pemasangan Area Alarm 3 Gas (O, V, CA) Rp 22,208,000


Pengadaan & Pemasangan Area Alarm 3 Gas (O, V, CA) bh 1.000 Rp 18,207,000.00 Rp 18,207,000
Alat bantu & penunjang Ls 1.000 Rp 1,820,700.00 Rp 1,820,700
Tukang hari 0.429 Rp 145,000.00 Rp 62,143
Kepala tukang hari 0.429 Rp 155,000.00 Rp 66,429
Mandor hari 0.214 Rp 155,000.00 Rp 33,214
Jumlah Rp 20,189,486
Keuntungan 10% Rp 2,018,949
Total = Jumlah+(Keuntungan 10%) Rp 22,208,434

1 BH Pengadaan & Pemasangan Area Alarm 4 Gas (O, V, N, CA) Rp 29,567,000


Pengadaan & Pemasangan Area Alarm 4 Gas (O, V, N, CA) bh 1.000 Rp 24,288,750.00 Rp 24,288,750
Alat bantu & penunjang Ls 1.000 Rp 2,428,875.00 Rp 2,428,875
Tukang hari 0.429 Rp 145,000.00 Rp 62,143
Kepala tukang hari 0.429 Rp 155,000.00 Rp 66,429
Mandor hari 0.214 Rp 155,000.00 Rp 33,214
Jumlah Rp 26,879,411
Keuntungan 10% Rp 2,687,941
Total = Jumlah+(Keuntungan 10%) Rp 29,567,352

1 BH Pengadaan & Pemasangan Head Bed pabrikan ukuran 1200 x 800 x 220mm Rp 3,183,000
Pengadaan & Pemasangan Head Bed pabrikan ukuran 1200 x 800 x 220mm bh 1.000 Rp 2,550,000.00 Rp 2,550,000
Alat bantu & penunjang Ls 1.000 Rp 127,500.00 Rp 127,500
Tukang hari 0.571 Rp 145,000.00 Rp 82,857
Kepala tukang hari 0.571 Rp 155,000.00 Rp 88,571
Mandor hari 0.286 Rp 155,000.00 Rp 44,286
Jumlah Rp 2,893,214
Keuntungan 10% Rp 289,321
Total = Jumlah+(Keuntungan 10%) Rp 3,182,536

1 M' Pengadaan & Pemasangan PIPA TEMBAGA Diameter 3/4" Rp 269,000


Pengadaan & Pemasangan PIPA TEMBAGA Diameter 7/8" Meter 1.000 Rp 190,800.00 Rp 190,800
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 47,700.00 Rp 47,700
Tukang hari 0.017 Rp 145,000.00 Rp 2,417
Kepala tukang hari 0.017 Rp 155,000.00 Rp 2,583
Mandor hari 0.008 Rp 155,000.00 Rp 1,292
Jumlah Rp 244,792
Keuntungan 10% Rp 24,479
Total = Jumlah+(Keuntungan 10%) Rp 269,271

1 M' Pengadaan & Pemasangan PIPA TEMBAGA Diameter 1/2" Rp 152,000


Pengadaan & Pemasangan PIPA TEMBAGA Diameter 1/2" Meter 1.000 Rp 105,300.00 Rp 105,300
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 26,325.00 Rp 26,325
Tukang hari 0.017 Rp 145,000.00 Rp 2,417
Analisa Harga Satuan Pekerjaan MEP - page 157 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Kepala tukang hari 0.017 Rp 155,000.00 Rp 2,583
Mandor hari 0.008 Rp 155,000.00 Rp 1,292
Jumlah Rp 137,917
Keuntungan 10% Rp 13,792
Total = Jumlah+(Keuntungan 10%) Rp 151,708
1 M' Pengadaan & Pemasangan PIPA TEMBAGA Diameter 3/8" Rp 98,000
Pengadaan & Pemasangan PIPA TEMBAGA Diameter 3/8" Meter 1.000 Rp 66,150.00 Rp 66,150
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 16,537.50 Rp 16,538
Tukang hari 0.017 Rp 145,000.00 Rp 2,417
Kepala tukang hari 0.017 Rp 155,000.00 Rp 2,583
Mandor hari 0.008 Rp 155,000.00 Rp 1,292
Jumlah Rp 88,979
Keuntungan 10% Rp 8,898
Total = Jumlah+(Keuntungan 10%) Rp 97,877

1 M' Pengadaan & Pemasangan PIPA TEMBAGA Diameter 5/8" Rp 214,000


Pengadaan & Pemasangan PIPA TEMBAGA Diameter 5/8" Meter 1.000 Rp 150,300.00 Rp 150,300
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 37,575.00 Rp 37,575
Tukang hari 0.017 Rp 145,000.00 Rp 2,417
Kepala tukang hari 0.017 Rp 155,000.00 Rp 2,583
Mandor hari 0.008 Rp 155,000.00 Rp 1,292
Jumlah Rp 194,167
Keuntungan 10% Rp 19,417
Total = Jumlah+(Keuntungan 10%) Rp 213,583

1 M' Pengadaan & Pemasangan PIPA TEMBAGA Diameter 7/8" Rp 335,000


Pengadaan & Pemasangan PIPA TEMBAGA Diameter 7/8" Meter 1.000 Rp 238,500.00 Rp 238,500
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 59,625.00 Rp 59,625
Tukang hari 0.017 Rp 145,000.00 Rp 2,417
Kepala tukang hari 0.017 Rp 155,000.00 Rp 2,583
Mandor hari 0.008 Rp 155,000.00 Rp 1,292
Jumlah Rp 304,417
Keuntungan 10% Rp 30,442
Total = Jumlah+(Keuntungan 10%) Rp 334,858

1 M' Pengadaan & Pemasangan PIPA TEMBAGA Diameter 1" Rp 410,000


Pengadaan & Pemasangan PIPA TEMBAGA Diameter 1 " Meter 1.000 Rp 293,400.00 Rp 293,400
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 73,350.00 Rp 73,350
Tukang hari 0.017 Rp 145,000.00 Rp 2,417
Kepala tukang hari 0.017 Rp 155,000.00 Rp 2,583
Mandor hari 0.008 Rp 155,000.00 Rp 1,292
Jumlah Rp 373,042
Keuntungan 10% Rp 37,304
Total = Jumlah+(Keuntungan 10%) Rp 410,346

1 M' Pengadaan & Pemasangan PIPA TEMBAGA Diameter 1 1/4" Rp 443,000


Pengadaan & Pemasangan PIPA TEMBAGA Diameter 1 1/4" Meter 1.000 Rp 316,800.00 Rp 316,800
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 79,200.00 Rp 79,200
Tukang hari 0.017 Rp 145,000.00 Rp 2,417
Kepala tukang hari 0.017 Rp 155,000.00 Rp 2,583
Mandor hari 0.008 Rp 155,000.00 Rp 1,292
Jumlah Rp 402,292
Keuntungan 10% Rp 40,229
Total = Jumlah+(Keuntungan 10%) Rp 442,521

1 M' Pengadaan & Pemasangan PIPA TEMBAGA Diameter 1 1/2" Rp 459,000


Pengadaan & Pemasangan PIPA TEMBAGA Diameter 1 1/2" Meter 1.000 Rp 328,500.00 Rp 328,500
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 82,125.00 Rp 82,125
Tukang hari 0.017 Rp 145,000.00 Rp 2,417
Kepala tukang hari 0.017 Rp 155,000.00 Rp 2,583
Mandor hari 0.008 Rp 155,000.00 Rp 1,292
Jumlah Rp 416,917
Keuntungan 10% Rp 41,692
Total = Jumlah+(Keuntungan 10%) Rp 458,608

1 M' Pengadaan & Pemasangan PIPA TEMBAGA Diameter 1 1/8" Rp 459,000


Pengadaan & Pemasangan PIPA TEMBAGA Diameter 1 1/8" Meter 1.000 Rp 328,500.00 Rp 328,500
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 82,125.00 Rp 82,125
Tukang hari 0.017 Rp 145,000.00 Rp 2,417
Kepala tukang hari 0.017 Rp 155,000.00 Rp 2,583
Mandor hari 0.008 Rp 155,000.00 Rp 1,292
Jumlah Rp 416,917
Keuntungan 10% Rp 41,692
Total = Jumlah+(Keuntungan 10%) Rp 458,608

1 M' Pengadaan & Pemasangan PIPA TEMBAGA Diameter 1 3/8" Rp 434,000


Pengadaan & Pemasangan PIPA TEMBAGA Diameter 1 3/8" Meter 1.000 Rp 310,500.00 Rp 310,500
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 77,625.00 Rp 77,625
Tukang hari 0.017 Rp 145,000.00 Rp 2,417
Kepala tukang hari 0.017 Rp 155,000.00 Rp 2,583
Mandor hari 0.008 Rp 155,000.00 Rp 1,292
Jumlah Rp 394,417
Keuntungan 10% Rp 39,442
Total = Jumlah+(Keuntungan 10%) Rp 433,858

1 M' Pengadaan & Pemasangan PIPA TEMBAGA Diameter 1 5/8" Rp 523,000


Pengadaan & Pemasangan PIPA TEMBAGA Diameter 1 5/8" Meter 1.000 Rp 375,000.00 Rp 375,000
Analisa Harga Satuan Pekerjaan MEP - page 158 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 93,750.00 Rp 93,750
Tukang hari 0.017 Rp 145,000.00 Rp 2,417
Kepala tukang hari 0.017 Rp 155,000.00 Rp 2,583
Mandor hari 0.008 Rp 155,000.00 Rp 1,292
Jumlah Rp 475,042
Keuntungan 10% Rp 47,504
Total = Jumlah+(Keuntungan 10%) Rp 522,546

1 M' Pengadaan & Pemasangan PIPA TEMBAGA Diameter 2 1/8" Rp 880,000


Pengadaan & Pemasangan PIPA TEMBAGA Diameter 2 1/8" Meter 1.000 Rp 635,000.00 Rp 635,000
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 158,750.00 Rp 158,750
Tukang hari 0.017 Rp 145,000.00 Rp 2,417
Kepala tukang hari 0.017 Rp 155,000.00 Rp 2,583
Mandor hari 0.008 Rp 155,000.00 Rp 1,292
Jumlah Rp 800,042
Keuntungan 10% Rp 80,004
Total = Jumlah+(Keuntungan 10%) Rp 880,046

PEKERJAAN HVAC

1 UNIT Pengadaan & Pemasangan Outdoor Unit VRV, kap. 236 770 BTU/h Rp 830,500
Outdoor Unit VRV, kapasitas : 236 770 BTU/h bh 1.000 Rp - Rp -
Dudukan & Alat bantu Set 1.000 Rp -
Tenaga Kerja :
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 755,000
Keuntungan 10% Rp 75,500
Total = Jumlah+(Keuntungan 10%) Rp 830,500

1 UNIT Pengadaan & Pemasangan Outdoor Unit VRV, kap. 308 400 BTU/h Rp 830,500
Outdoor Unit VRV, kapasitas : 308 400 BTU/h bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp -
Tenaga Kerja :
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 755,000
Keuntungan 10% Rp 75,500
Total = Jumlah+(Keuntungan 10%) Rp 830,500

1 UNIT Pengadaan & Pemasangan Outdoor Unit VRV, kap. 299 500 BTU/h Rp 830,500
Outdoor Unit VRV, kapasitas : 299 500 BTU/h bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp -
Tenaga Kerja :
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 755,000
Keuntungan 10% Rp 75,500
Total = Jumlah+(Keuntungan 10%) Rp 830,500

1 UNIT Pengadaan & Pemasangan Outdoor Unit VRV, kap. 232 300 BTU/h Rp 830,500
Outdoor Unit VRV, kapasitas : 232 300 BTU/h bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp -
Tenaga Kerja :
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 755,000
Keuntungan 10% Rp 75,500
Total = Jumlah+(Keuntungan 10%) Rp 830,500

1 UNIT Pengadaan & Pemasangan Outdoor Unit VRV, kap. 174 300 BTU/h Rp 830,500
Outdoor Unit VRV, kapasitas : 174 300 BTU/h bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp -
Tenaga Kerja :
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 755,000
Keuntungan 10% Rp 75,500
Total = Jumlah+(Keuntungan 10%) Rp 830,500

1 UNIT Pengadaan & Pemasangan Outdoor Unit VRV, kap. 362 000 BTU/h Rp 830,500
Outdoor Unit VRV, kapasitas : 362 000 BTU/h bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp -
Tenaga Kerja :
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 755,000
Keuntungan 10% Rp 75,500
Total = Jumlah+(Keuntungan 10%) Rp 830,500

1 UNIT Pengadaan & Pemasangan Indoor Unit, kap. 32 000 BTU/h - Cassetye Type 4 Way lengkap Decoratif Panel Rp 415,250
IU, kapasitas : 32 000 BTU/h - Cassete type 4 Way bh 1.000 Rp - Rp -
Analisa Harga Satuan Pekerjaan MEP - page 159 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Dudukan & Alat bantu Set 1.000 Rp -
Tenaga Kerja :
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Kepala tukang hari 1.000 Rp 155,000.00 Rp 155,000
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Jumlah Rp 377,500
Keuntungan 10% Rp 37,750
Total = Jumlah+(Keuntungan 10%) Rp 415,250

1 UNIT Pengadaan & Pemasangan Indoor Unit, kap. 27 500 BTU/h - Cassetye Type 4 Way lengkap Decoratif Panel Rp 415,250
IU, kapasitas : 27 500 BTU/h - Cassete type 4 Way bh 1.000 Rp - Rp -
Dudukan & Alat bantu Set 1.000 Rp -
Tenaga Kerja :
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Kepala tukang hari 1.000 Rp 155,000.00 Rp 155,000
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Jumlah Rp 377,500
Keuntungan 10% Rp 37,750
Total = Jumlah+(Keuntungan 10%) Rp 415,250

1 UNIT Pengadaan & Pemasangan Indoor Unit, kap. 25 000 BTU/h - Cassetye Type 4 Way lengkap Decoratif Panel Rp 415,250
IU, kapasitas : 25 000 BTU/h - Cassete type bh 1.000 Rp - Rp -
Dudukan & Alat bantu Set 1.000 Rp -
Tenaga Kerja :
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Kepala tukang hari 1.000 Rp 155,000.00 Rp 155,000
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Jumlah Rp 377,500
Keuntungan 10% Rp 37,750
Total = Jumlah+(Keuntungan 10%) Rp 415,250

1 UNIT Pengadaan & Pemasangan Indoor Unit, kap. 23 900 BTU/h - Cassetye Type 4 Way lengkap Decoratif Panel Rp 415,250
IU, kapasitas : 23 900 BTU/h - Cassete type bh 1.000 Rp - Rp -
Dudukan & Alat bantu Set 1.000 Rp -
Tenaga Kerja :
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Kepala tukang hari 1.000 Rp 155,000.00 Rp 155,000
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Jumlah Rp 377,500
Keuntungan 10% Rp 37,750
Total = Jumlah+(Keuntungan 10%) Rp 415,250

1 UNIT Pengadaan & Pemasangan Indoor Unit, kap. 22 200 BTU/h - Cassetye Type 4 Way lengkap Decoratif Panel Rp 415,250
IU, kapasitas : 22 200 BTU/h - Cassete type bh 1.000 Rp - Rp -
Dudukan & Alat bantu Set 1.000 Rp -
Tenaga Kerja :
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Kepala tukang hari 1.000 Rp 155,000.00 Rp 155,000
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Jumlah Rp 377,500
Keuntungan 10% Rp 37,750
Total = Jumlah+(Keuntungan 10%) Rp 415,250

1 UNIT Pengadaan & Pemasangan Indoor Unit, kap. 21 500 BTU/h - Cassetye Type 4 Way lengkap Decoratif Panel Rp 415,250
IU, kapasitas : 21 500 BTU/h - Cassete type bh 1.000 Rp - Rp -
Dudukan & Alat bantu Set 1.000 Rp -
Tenaga Kerja :
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Kepala tukang hari 1.000 Rp 155,000.00 Rp 155,000
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Jumlah Rp 377,500
Keuntungan 10% Rp 37,750
Total = Jumlah+(Keuntungan 10%) Rp 415,250

1 UNIT Pengadaan & Pemasangan Indoor Unit, kap. 19 800 BTU/h - Cassetye Type 4 Way lengkap Decoratif Panel Rp 415,250
IU, kapasitas : 19 800 BTU/h - Cassete type bh 1.000 Rp - Rp -
Dudukan & Alat bantu Set 1.000 Rp -
Tenaga Kerja :
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Kepala tukang hari 1.000 Rp 155,000.00 Rp 155,000
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Jumlah Rp 377,500
Keuntungan 10% Rp 37,750
Total = Jumlah+(Keuntungan 10%) Rp 415,250

1 UNIT Pengadaan & Pemasangan Indoor Unit, kap. 19 200 BTU/h - Cassetye Type 4 Way lengkap Decoratif Panel Rp 415,250
IU, kapasitas : 19 200 BTU/h - Cassete type bh 1.000 Rp - Rp -
Dudukan & Alat bantu Set 1.000 Rp -
Tenaga Kerja :
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Kepala tukang hari 1.000 Rp 155,000.00 Rp 155,000
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Jumlah Rp 377,500
Keuntungan 10% Rp 37,750
Total = Jumlah+(Keuntungan 10%) Rp 415,250

1 UNIT Pengadaan & Pemasangan Indoor Unit, kap. 18 400 BTU/h - Cassetye Type 4 Way lengkap Decoratif Panel Rp 415,250
IU, kapasitas : 18 400 BTU/h - Cassete type bh 1.000 Rp - Rp -
Analisa Harga Satuan Pekerjaan MEP - page 160 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Dudukan & Alat bantu Set 1.000 Rp -
Tenaga Kerja :
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Kepala tukang hari 1.000 Rp 155,000.00 Rp 155,000
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Jumlah Rp 377,500
Keuntungan 10% Rp 37,750
Total = Jumlah+(Keuntungan 10%) Rp 415,250

1 UNIT Pengadaan & Pemasangan Indoor Unit, kap. 18 000 BTU/h - Cassetye Type 4 Way lengkap Decoratif Panel Rp 415,250
IU, kapasitas : 18 000 BTU/h - Cassete type bh 1.000 Rp - Rp -
Dudukan & Alat bantu Set 1.000 Rp -
Tenaga Kerja :
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Kepala tukang hari 1.000 Rp 155,000.00 Rp 155,000
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Jumlah Rp 377,500
Keuntungan 10% Rp 37,750
Total = Jumlah+(Keuntungan 10%) Rp 415,250

1 UNIT Pengadaan & Pemasangan Indoor Unit, kap. 17 700 BTU/h - Cassetye Type 4 Way lengkap Decoratif Panel Rp 415,250
IU, kapasitas : 17 700 BTU/h - Cassete type bh 1.000 Rp - Rp -
Dudukan & Alat bantu Set 1.000 Rp -
Tenaga Kerja :
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Kepala tukang hari 1.000 Rp 155,000.00 Rp 155,000
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Jumlah Rp 377,500
Keuntungan 10% Rp 37,750
Total = Jumlah+(Keuntungan 10%) Rp 415,250

1 UNIT Pengadaan & Pemasangan Indoor Unit, kap. 16 000 BTU/h - Cassetye Type 4 Way lengkap Decoratif Panel Rp 415,250
IU, kapasitas : 16 000 BTU/h - Cassete type bh 1.000 Rp - Rp -
Dudukan & Alat bantu Set 1.000 Rp -
Tenaga Kerja :
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Kepala tukang hari 1.000 Rp 155,000.00 Rp 155,000
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Jumlah Rp 377,500
Keuntungan 10% Rp 37,750
Total = Jumlah+(Keuntungan 10%) Rp 415,250

1 UNIT Pengadaan & Pemasangan Indoor Unit, kap. 14 000 BTU/h - Cassetye Type 4 Way lengkap Decoratif Panel Rp 415,250
IU, kapasitas : 14 000 BTU/h - Cassete type bh 1.000 Rp - Rp -
Dudukan & Alat bantu Set 1.000 Rp -
Tenaga Kerja :
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Kepala tukang hari 1.000 Rp 155,000.00 Rp 155,000
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Jumlah Rp 377,500
Keuntungan 10% Rp 37,750
Total = Jumlah+(Keuntungan 10%) Rp 415,250

1 UNIT Pengadaan & Pemasangan Indoor Unit, kap. 12 200 BTU/h - Cassetye Type 4 Way lengkap Decoratif Panel Rp 415,250
IU, kapasitas : 12 200 BTU/h - Cassete type bh 1.000 Rp - Rp -
Dudukan & Alat bantu Set 1.000 Rp -
Tenaga Kerja :
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Kepala tukang hari 1.000 Rp 155,000.00 Rp 155,000
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Jumlah Rp 377,500
Keuntungan 10% Rp 37,750
Total = Jumlah+(Keuntungan 10%) Rp 415,250

1 UNIT Pengadaan & Pemasangan Indoor Unit, kap. 12 000 BTU/h - Cassetye Type 4 Way lengkap Decoratif Panel Rp 415,250
IU, kapasitas : 12 000 BTU/h - Cassete type bh 1.000 Rp - Rp -
Dudukan & Alat bantu Set 1.000 Rp -
Tenaga Kerja :
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Kepala tukang hari 1.000 Rp 155,000.00 Rp 155,000
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Jumlah Rp 377,500
Keuntungan 10% Rp 37,750
Total = Jumlah+(Keuntungan 10%) Rp 415,250

1 UNIT Pengadaan & Pemasangan Indoor Unit, kap. 10 500 BTU/h - Cassetye Type 4 Way lengkap Decoratif Panel Rp 415,250
IU, kapasitas : 10 500 BTU/h - Cassete type bh 1.000 Rp - Rp -
Dudukan & Alat bantu Set 1.000 Rp -
Tenaga Kerja :
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Kepala tukang hari 1.000 Rp 155,000.00 Rp 155,000
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Jumlah Rp 377,500
Keuntungan 10% Rp 37,750
Total = Jumlah+(Keuntungan 10%) Rp 415,250

1 UNIT Pengadaan & Pemasangan Indoor Unit, kap. 11 900 BTU/h - Cassetye Type 4 Way lengkap Decoratif Panel Rp 415,250
IU, kapasitas : 11 900 BTU/h - Wall type bh 1.000 Rp - Rp -
Analisa Harga Satuan Pekerjaan MEP - page 161 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Dudukan & Alat bantu Set 1.000 Rp -
Tenaga Kerja :
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Kepala tukang hari 1.000 Rp 155,000.00 Rp 155,000
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Jumlah Rp 377,500
Keuntungan 10% Rp 37,750
Total = Jumlah+(Keuntungan 10%) Rp 415,250

1 UNIT Pengadaan & Pemasangan Indoor Unit, kap. 11 200 BTU/h - Cassetye Type 4 Way lengkap Decoratif Panel Rp 415,250
IU, kapasitas : 11 200 BTU/h - Wall type bh 1.000 Rp - Rp -
Dudukan & Alat bantu Set 1.000 Rp -
Tenaga Kerja :
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Kepala tukang hari 1.000 Rp 155,000.00 Rp 155,000
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Jumlah Rp 377,500
Keuntungan 10% Rp 37,750
Total = Jumlah+(Keuntungan 10%) Rp 415,250

1 UNIT Pengadaan & Pemasangan Indoor Unit, kap. 14 400 BTU/h - Wall Type Rp 415,250
IU, kapasitas : 14 400 BTU/h - Wall type bh 1.000 Rp - Rp -
Dudukan & Alat bantu Set 1.000 Rp -
Tenaga Kerja :
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Kepala tukang hari 1.000 Rp 155,000.00 Rp 155,000
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Jumlah Rp 377,500
Keuntungan 10% Rp 37,750
Total = Jumlah+(Keuntungan 10%) Rp 415,250

1 UNIT Pengadaan & Pemasangan Indoor Unit, kap. 12 200 BTU/h - Wall Type Rp 415,250
IU, kapasitas : 12 200 BTU/h - Wall type bh 1.000 Rp - Rp -
Dudukan & Alat bantu Set 1.000 Rp -
Tenaga Kerja :
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Kepala tukang hari 1.000 Rp 155,000.00 Rp 155,000
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Jumlah Rp 377,500
Keuntungan 10% Rp 37,750
Total = Jumlah+(Keuntungan 10%) Rp 415,250

1 UNIT Pengadaan & Pemasangan Indoor Unit, kap. 8 400 BTU/h - Wall Type Rp 415,250
IU, kapasitas : 8 400 BTU/h - Wall type bh 1.000 Rp - Rp -
Dudukan & Alat bantu Set 1.000 Rp -
Tenaga Kerja :
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Kepala tukang hari 1.000 Rp 155,000.00 Rp 155,000
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Jumlah Rp 377,500
Keuntungan 10% Rp 37,750
Total = Jumlah+(Keuntungan 10%) Rp 415,250

1 UNIT Pengadaan & Pemasangan Indoor Unit, kap. 8 000 BTU/h - Wall Type Rp 415,250
IU, kapasitas : 8 000 BTU/h - Wall type bh 1.000 Rp - Rp -
Dudukan & Alat bantu Set 1.000 Rp -
Tenaga Kerja :
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Kepala tukang hari 1.000 Rp 155,000.00 Rp 155,000
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Jumlah Rp 377,500
Keuntungan 10% Rp 37,750
Total = Jumlah+(Keuntungan 10%) Rp 415,250

1 UNIT Pengadaan & Pemasangan Indoor Unit, kap. 7 810 BTU/h - Wall Type Rp 415,250
IU, kapasitas : 7 810 BTU/h - Wall type bh 1.000 Rp - Rp -
Dudukan & Alat bantu Set 1.000 Rp -
Tenaga Kerja :
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Kepala tukang hari 1.000 Rp 155,000.00 Rp 155,000
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Jumlah Rp 377,500
Keuntungan 10% Rp 37,750
Total = Jumlah+(Keuntungan 10%) Rp 415,250

1 UNIT Pengadaan & Pemasangan Indoor Unit, kap. 7 500 BTU/h - Wall Type Rp 415,250
IU, kapasitas : 7 500 BTU/h - Wall type bh 1.000 Rp - Rp -
Dudukan & Alat bantu Set 1.000 Rp -
Tenaga Kerja :
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Kepala tukang hari 1.000 Rp 155,000.00 Rp 155,000
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Jumlah Rp 377,500
Keuntungan 10% Rp 37,750
Total = Jumlah+(Keuntungan 10%) Rp 415,250

1 UNIT Pengadaan & Pemasangan Indoor Unit, kap. 5 800 BTU/h - Wall Type Rp 415,250
IU, kapasitas : 5 800 BTU/h - Wall type bh 1.000 Rp - Rp -
Analisa Harga Satuan Pekerjaan MEP - page 162 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Dudukan & Alat bantu Set 1.000 Rp -
Tenaga Kerja :
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Kepala tukang hari 1.000 Rp 155,000.00 Rp 155,000
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Jumlah Rp 377,500
Keuntungan 10% Rp 37,750
Total = Jumlah+(Keuntungan 10%) Rp 415,250

1 UNIT Pengadaan & Pemasangan Indoor Unit, kap. 4 900 BTU/h - Wall Type Rp 415,250
IU, kapasitas : 4 900 BTU/h - Wall type bh 1.000 Rp - Rp -
Dudukan & Alat bantu Set 1.000 Rp -
Tenaga Kerja :
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Kepala tukang hari 1.000 Rp 155,000.00 Rp 155,000
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Jumlah Rp 377,500
Keuntungan 10% Rp 37,750
Total = Jumlah+(Keuntungan 10%) Rp 415,250

1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( CU + FCU ) kap. 90 000 BTU/h - Single Split Duct Rp 831,000
CU + FCU , kapasitas ; 90 000 BTU/h set 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 755,000
Keuntungan 10% Rp 75,500
Total = Jumlah+(Keuntungan 10%) Rp 830,500

1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( CU + FCU ) kap. 84 000 BTU/h - Single Split Duct Rp 831,000
kapasitas : 84 000 BTU/h bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 755,000
Keuntungan 10% Rp 75,500
Total = Jumlah+(Keuntungan 10%) Rp 830,500

1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( CU + FCU ) kap. 126 000 BTU/h - Single Split Duct Rp 831,000
kapasitas : 126 000 BTU/h bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 755,000
Keuntungan 10% Rp 75,500
Total = Jumlah+(Keuntungan 10%) Rp 830,500

1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( CU + AHU ) kap. 324 000 BTU/h - Single Split Duct Rp 831,000
kapasitas : 324 000 BTU/h bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 755,000
Keuntungan 10% Rp 75,500
Total = Jumlah+(Keuntungan 10%) Rp 830,500

1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( CU + AHU ) kap. 247 404 BTU/h - Single Split Duct Rp 831,000
kapasitas : 247 404 BTU/h bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 755,000
Keuntungan 10% Rp 75,500
Total = Jumlah+(Keuntungan 10%) Rp 830,500

1 UNIT Pengadaan & Pemasangan Outdoor Procesing Include Remote GF.1,kapasitas : 47 800 BTU/h Rp 831,000
Outdoor Procesing Include Remote GF.1,kapasitas : 47 800 BTU/h bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 755,000
Keuntungan 10% Rp 75,500
Total = Jumlah+(Keuntungan 10%) Rp 830,500

1 UNIT Pengadaan & Pemasangan Outdoor Procesing Include Remote GF.1,kapasitas : 76 400 BTU/h Rp 831,000
Outdoor Procesing Include Remote GF.2,kapasitas : 76 400 BTU/h bh 1.000 Rp - Rp -
Analisa Harga Satuan Pekerjaan MEP - page 163 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 755,000
Keuntungan 10% Rp 75,500
Total = Jumlah+(Keuntungan 10%) Rp 830,500

1 UNIT Pengadaan & Pemasangan Outdoor Procesing Include Remote GF.1,kapasitas : 95 500 BTU/h Rp 831,000
Outdoor Procesing Include Remote GF.3,kapasitas : 95 500 BTU/h bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 755,000
Keuntungan 10% Rp 75,500
Total = Jumlah+(Keuntungan 10%) Rp 830,500

1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 3 716 BTU/h - Single Split / Wall Rp 380,000
Unit AC Single Split 1/4 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 345,714
Keuntungan 10% Rp 34,571
Total = Jumlah+(Keuntungan 10%) Rp 380,286

1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 17 062 BTU/h - Single Split / Wall Rp 380,000
Unit AC Single Split 2 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 345,714
Keuntungan 10% Rp 34,571
Total = Jumlah+(Keuntungan 10%) Rp 380,286

1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 18 623 BTU/h - Single Split / Wall Rp 380,000
Unit AC Single Split 2 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 345,714
Keuntungan 10% Rp 34,571
Total = Jumlah+(Keuntungan 10%) Rp 380,286
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 11 794 BTU/h - Single Split / Wall Rp 380,000
Unit AC Single Split 1 1/4 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 345,714
Keuntungan 10% Rp 34,571
Total = Jumlah+(Keuntungan 10%) Rp 380,286
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 14 157 BTU/h - Single Split / Wall Rp 6,733,000
Unit AC Single Split 1 1/2 PK bh 1.000 Rp 5,500,000.00 Rp 5,500,000
Alat bantu Set 1.000 Rp 275,000.00 Rp 275,000
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 6,120,714
Keuntungan 10% Rp 612,071
Total = Jumlah+(Keuntungan 10%) Rp 6,732,786
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 17 160 BTU/h - Single Split / Wall Rp 380,000
Unit AC Single Split 2 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 345,714
Keuntungan 10% Rp 34,571
Total = Jumlah+(Keuntungan 10%) Rp 380,286

1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 14 913 BTU/h - Single Split / Wall Rp 380,000
Unit AC Single Split 1 3/4 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Analisa Harga Satuan Pekerjaan MEP - page 164 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 345,714
Keuntungan 10% Rp 34,571
Total = Jumlah+(Keuntungan 10%) Rp 380,286
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 12 131 BTU/h - Single Split / Wall Rp 6,733,000
Unit AC Single Split 1 1/2 PK bh 1.000 Rp 5,500,000.00 Rp 5,500,000
Alat bantu Set 1.000 Rp 275,000.00 Rp 275,000
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 6,120,714
Keuntungan 10% Rp 612,071
Total = Jumlah+(Keuntungan 10%) Rp 6,732,786
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 12 161 BTU/h - Single Split / Wall Rp 6,733,000
Unit AC Single Split 1 1/2 PK bh 1.000 Rp 5,500,000.00 Rp 5,500,000
Alat bantu Set 1.000 Rp 275,000.00 Rp 275,000
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 6,120,714
Keuntungan 10% Rp 612,071
Total = Jumlah+(Keuntungan 10%) Rp 6,732,786
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 8 223 BTU/h - Single Split / Wall Rp 380,000
Unit AC Single Split 1 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 345,714
Keuntungan 10% Rp 34,571
Total = Jumlah+(Keuntungan 10%) Rp 380,286
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 12 594 BTU/h - Single Split / Wall Rp 6,733,000
Unit AC Single Split 1 1/2 PK bh 1.000 Rp 5,500,000.00 Rp 5,500,000
Alat bantu Set 1.000 Rp 275,000.00 Rp 275,000
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 6,120,714
Keuntungan 10% Rp 612,071
Total = Jumlah+(Keuntungan 10%) Rp 6,732,786
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 6 153 BTU/h - Single Split / Wall Rp 380,000
Unit AC Single Split 3/4 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 345,714
Keuntungan 10% Rp 34,571
Total = Jumlah+(Keuntungan 10%) Rp 380,286
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 24 661 BTU/h - Single Split / Cassete Rp 712,000
Unit AC Single Split 3 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.857 Rp 155,000.00 Rp 132,857
Kepala tukang hari 1.714 Rp 155,000.00 Rp 265,714
Tukang hari 1.714 Rp 145,000.00 Rp 248,571
Jumlah Rp 647,143
Keuntungan 10% Rp 64,714
Total = Jumlah+(Keuntungan 10%) Rp 711,857
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 21 315 BTU/h - Single Split / Cassete Rp 31,319,000
Unit AC Single Split 2 1/4 PK bh 1.000 Rp 26,500,000.00 Rp 26,500,000
Alat bantu Set 1.000 Rp 1,325,000.00 Rp 1,325,000
Tenaga Kerja :
Mandor hari 0.857 Rp 155,000.00 Rp 132,857
Kepala tukang hari 1.714 Rp 155,000.00 Rp 265,714
Tukang hari 1.714 Rp 145,000.00 Rp 248,571
Jumlah Rp 28,472,143
Keuntungan 10% Rp 2,847,214
Total = Jumlah+(Keuntungan 10%) Rp 31,319,357
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 28 965 BTU/h - Single Split / Cassete Rp 712,000
Unit AC Single Split 3 1/4 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.857 Rp 155,000.00 Rp 132,857
Kepala tukang hari 1.714 Rp 155,000.00 Rp 265,714
Tukang hari 1.714 Rp 145,000.00 Rp 248,571
Jumlah Rp 647,143
Keuntungan 10% Rp 64,714
Total = Jumlah+(Keuntungan 10%) Rp 711,857

1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 29 684 BTU/h - Single Split / Cassete Rp 712,000
Unit AC Single Split 3 1/4 PK bh 1.000 Rp - Rp -
Analisa Harga Satuan Pekerjaan MEP - page 165 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.857 Rp 155,000.00 Rp 132,857
Kepala tukang hari 1.714 Rp 155,000.00 Rp 265,714
Tukang hari 1.714 Rp 145,000.00 Rp 248,571
Jumlah Rp 647,143
Keuntungan 10% Rp 64,714
Total = Jumlah+(Keuntungan 10%) Rp 711,857
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 23 833 BTU/h - Single Split / Cassete Rp 712,000
Unit AC Single Split 2 1/2 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.857 Rp 155,000.00 Rp 132,857
Kepala tukang hari 1.714 Rp 155,000.00 Rp 265,714
Tukang hari 1.714 Rp 145,000.00 Rp 248,571
Jumlah Rp 647,143
Keuntungan 10% Rp 64,714
Total = Jumlah+(Keuntungan 10%) Rp 711,857
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 22 609 BTU/h - Single Split / Cassete Rp 712,000
Unit AC Single Split 2 1/2 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.857 Rp 155,000.00 Rp 132,857
Kepala tukang hari 1.714 Rp 155,000.00 Rp 265,714
Tukang hari 1.714 Rp 145,000.00 Rp 248,571
Jumlah Rp 647,143
Keuntungan 10% Rp 64,714
Total = Jumlah+(Keuntungan 10%) Rp 711,857
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 21 616 BTU/h - Single Split / Cassete Rp 712,000
Unit AC Single Split 2 1/2 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.857 Rp 155,000.00 Rp 132,857
Kepala tukang hari 1.714 Rp 155,000.00 Rp 265,714
Tukang hari 1.714 Rp 145,000.00 Rp 248,571
Jumlah Rp 647,143
Keuntungan 10% Rp 64,714
Total = Jumlah+(Keuntungan 10%) Rp 711,857
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 20 838 BTU/h - Single Split / Cassete Rp 712,000
Unit AC Single Split 2 1/2 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.857 Rp 155,000.00 Rp 132,857
Kepala tukang hari 1.714 Rp 155,000.00 Rp 265,714
Tukang hari 1.714 Rp 145,000.00 Rp 248,571
Jumlah Rp 647,143
Keuntungan 10% Rp 64,714
Total = Jumlah+(Keuntungan 10%) Rp 711,857
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 28 323 BTU/h - Single Split / Cassete Rp 712,000
Unit AC Single Split 3 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.857 Rp 155,000.00 Rp 132,857
Kepala tukang hari 1.714 Rp 155,000.00 Rp 265,714
Tukang hari 1.714 Rp 145,000.00 Rp 248,571
Jumlah Rp 647,143
Keuntungan 10% Rp 64,714
Total = Jumlah+(Keuntungan 10%) Rp 711,857
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 24 924 BTU/h - Single Split / Cassete Rp 712,000
Unit AC Single Split 3 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.857 Rp 155,000.00 Rp 132,857
Kepala tukang hari 1.714 Rp 155,000.00 Rp 265,714
Tukang hari 1.714 Rp 145,000.00 Rp 248,571
Jumlah Rp 647,143
Keuntungan 10% Rp 64,714
Total = Jumlah+(Keuntungan 10%) Rp 711,857
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 22 266 BTU/h - Single Split / Cassete Rp 712,000
Unit AC Single Split 2 1/2 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.857 Rp 155,000.00 Rp 132,857
Kepala tukang hari 1.714 Rp 155,000.00 Rp 265,714
Tukang hari 1.714 Rp 145,000.00 Rp 248,571
Jumlah Rp 647,143
Keuntungan 10% Rp 64,714
Total = Jumlah+(Keuntungan 10%) Rp 711,857
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 20 053 BTU/h - Single Split / Cassete Rp 31,319,000
Unit AC Single Split 2 1/4 PK bh 1.000 Rp 26,500,000.00 Rp 26,500,000
Alat bantu Set 1.000 Rp 1,325,000.00 Rp 1,325,000
Tenaga Kerja :
Mandor hari 0.857 Rp 155,000.00 Rp 132,857
Kepala tukang hari 1.714 Rp 155,000.00 Rp 265,714
Tukang hari 1.714 Rp 145,000.00 Rp 248,571
Jumlah Rp 28,472,143
Keuntungan 10% Rp 2,847,214
Total = Jumlah+(Keuntungan 10%) Rp 31,319,357
Analisa Harga Satuan Pekerjaan MEP - page 166 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 3 136 BTU/h - Single Split / Wall Rp 380,000
Unit AC Single Split 1/4 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 345,714
Keuntungan 10% Rp 34,571
Total = Jumlah+(Keuntungan 10%) Rp 380,286
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 1 637 BTU/h - Single Split / Wall Rp 380,000
Unit AC Single Split 1/4 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 345,714
Keuntungan 10% Rp 34,571
Total = Jumlah+(Keuntungan 10%) Rp 380,286
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 9 740 BTU/h - Single Split / Wall Rp 380,000
Unit AC Single Split 1 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 345,714
Keuntungan 10% Rp 34,571
Total = Jumlah+(Keuntungan 10%) Rp 380,286
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 11 061 BTU/h - Single Split / Wall Rp 6,733,000
Unit AC Single Split 1 1/2 PK bh 1.000 Rp 5,500,000.00 Rp 5,500,000
Alat bantu Set 1.000 Rp 275,000.00 Rp 275,000
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 6,120,714
Keuntungan 10% Rp 612,071
Total = Jumlah+(Keuntungan 10%) Rp 6,732,786
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 11 568 BTU/h - Single Split / Wall Rp 6,733,000
Unit AC Single Split 1 1/2 PK bh 1.000 Rp 5,500,000.00 Rp 5,500,000
Alat bantu Set 1.000 Rp 275,000.00 Rp 275,000
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 6,120,714
Keuntungan 10% Rp 612,071
Total = Jumlah+(Keuntungan 10%) Rp 6,732,786
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 13 467 BTU/h - Single Split / Wall Rp 380,000
Unit AC Single Split 1 3/4 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 345,714
Keuntungan 10% Rp 34,571
Total = Jumlah+(Keuntungan 10%) Rp 380,286
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 2 072 BTU/h - Single Split / Wall Rp 380,000
Unit AC Single Split 1/4 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 345,714
Keuntungan 10% Rp 34,571
Total = Jumlah+(Keuntungan 10%) Rp 380,286
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 11 349 BTU/h - Single Split / Wall Rp 6,733,000
Unit AC Single Split 1 1/2 PK bh 1.000 Rp 5,500,000.00 Rp 5,500,000
Alat bantu Set 1.000 Rp 275,000.00 Rp 275,000
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 6,120,714
Keuntungan 10% Rp 612,071
Total = Jumlah+(Keuntungan 10%) Rp 6,732,786
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 11 081 BTU/h - Single Split / Wall Rp 6,733,000
Unit AC Single Split 1 1/2 PK bh 1.000 Rp 5,500,000.00 Rp 5,500,000
Alat bantu Set 1.000 Rp 275,000.00 Rp 275,000
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 6,120,714
Analisa Harga Satuan Pekerjaan MEP - page 167 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Keuntungan 10% Rp 612,071
Total = Jumlah+(Keuntungan 10%) Rp 6,732,786
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 15 746 BTU/h - Single Split / Wall Rp 6,733,000
Unit AC Single Split 1 1/2 PK bh 1.000 Rp 5,500,000.00 Rp 5,500,000
Alat bantu Set 1.000 Rp 275,000.00 Rp 275,000
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 6,120,714
Keuntungan 10% Rp 612,071
Total = Jumlah+(Keuntungan 10%) Rp 6,732,786
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 13 574 BTU/h - Single Split / Wall Rp 6,733,000
Unit AC Single Split 1 1/2 PK bh 1.000 Rp 5,500,000.00 Rp 5,500,000
Alat bantu Set 1.000 Rp 275,000.00 Rp 275,000
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 6,120,714
Keuntungan 10% Rp 612,071
Total = Jumlah+(Keuntungan 10%) Rp 6,732,786
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 13 824 BTU/h - Single Split / Wall Rp 6,733,000
Unit AC Single Split 1 1/2 PK bh 1.000 Rp 5,500,000.00 Rp 5,500,000
Alat bantu Set 1.000 Rp 275,000.00 Rp 275,000
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 6,120,714
Keuntungan 10% Rp 612,071
Total = Jumlah+(Keuntungan 10%) Rp 6,732,786

1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 13 535 BTU/h - Single Split / Wall Rp 6,733,000
Unit AC Single Split 1 1/2 PK bh 1.000 Rp 5,500,000.00 Rp 5,500,000
Alat bantu Set 1.000 Rp 275,000.00 Rp 275,000
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 6,120,714
Keuntungan 10% Rp 612,071
Total = Jumlah+(Keuntungan 10%) Rp 6,732,786
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 13 329 BTU/h - Single Split / Wall Rp 6,733,000
Unit AC Single Split 1 1/2 PK bh 1.000 Rp 5,500,000.00 Rp 5,500,000
Alat bantu Set 1.000 Rp 275,000.00 Rp 275,000
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 6,120,714
Keuntungan 10% Rp 612,071
Total = Jumlah+(Keuntungan 10%) Rp 6,732,786

1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 13 475 BTU/h - Single Split / Wall Rp 6,733,000
Unit AC Single Split 1 1/2 PK bh 1.000 Rp 5,500,000.00 Rp 5,500,000
Alat bantu Set 1.000 Rp 275,000.00 Rp 275,000
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 6,120,714
Keuntungan 10% Rp 612,071
Total = Jumlah+(Keuntungan 10%) Rp 6,732,786
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 13 000 BTU/h - Single Split / Wall Rp 6,733,000
Unit AC Single Split 1 1/2 PK bh 1.000 Rp 5,500,000.00 Rp 5,500,000
Alat bantu Set 1.000 Rp 275,000.00 Rp 275,000
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 6,120,714
Keuntungan 10% Rp 612,071
Total = Jumlah+(Keuntungan 10%) Rp 6,732,786

1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 2 222 BTU/h - Single Split / Wall Rp 380,000
Unit AC Single Split 1/4 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 345,714
Keuntungan 10% Rp 34,571
Total = Jumlah+(Keuntungan 10%) Rp 380,286
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 7 513 BTU/h - Single Split / Wall Rp 380,000
Unit AC Single Split 3/4 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Analisa Harga Satuan Pekerjaan MEP - page 168 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 345,714
Keuntungan 10% Rp 34,571
Total = Jumlah+(Keuntungan 10%) Rp 380,286
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 13 926 BTU/h - Single Split / Wall Rp 380,000
Unit AC Single Split 1 3/4 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 345,714
Keuntungan 10% Rp 34,571
Total = Jumlah+(Keuntungan 10%) Rp 380,286
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 6 955 BTU/h - Single Split / Wall Rp 380,000
Unit AC Single Split 3/4 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 345,714
Keuntungan 10% Rp 34,571
Total = Jumlah+(Keuntungan 10%) Rp 380,286
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 14 820 BTU/h - Single Split / Wall Rp 380,000
Unit AC Single Split 1 3/4 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 345,714
Keuntungan 10% Rp 34,571
Total = Jumlah+(Keuntungan 10%) Rp 380,286
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 2 699 BTU/h - Single Split / Wall Rp 380,000
Unit AC Single Split 1/4 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 345,714
Keuntungan 10% Rp 34,571
Total = Jumlah+(Keuntungan 10%) Rp 380,286
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 29 775 BTU/h - Single Split / Cassete Rp 712,000
Unit AC Single Split 3 1/4 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.857 Rp 155,000.00 Rp 132,857
Kepala tukang hari 1.714 Rp 155,000.00 Rp 265,714
Tukang hari 1.714 Rp 145,000.00 Rp 248,571
Jumlah Rp 647,143
Keuntungan 10% Rp 64,714
Total = Jumlah+(Keuntungan 10%) Rp 711,857
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 30 926 BTU/h - Single Split / Cassete Rp 712,000
Unit AC Single Split 4 1/4 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.857 Rp 155,000.00 Rp 132,857
Kepala tukang hari 1.714 Rp 155,000.00 Rp 265,714
Tukang hari 1.714 Rp 145,000.00 Rp 248,571
Jumlah Rp 647,143
Keuntungan 10% Rp 64,714
Total = Jumlah+(Keuntungan 10%) Rp 711,857
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 27 942 BTU/h - Single Split / Cassete Rp 712,000
Unit AC Single Split 3 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.857 Rp 155,000.00 Rp 132,857
Kepala tukang hari 1.714 Rp 155,000.00 Rp 265,714
Tukang hari 1.714 Rp 145,000.00 Rp 248,571
Jumlah Rp 647,143
Keuntungan 10% Rp 64,714
Total = Jumlah+(Keuntungan 10%) Rp 711,857
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 29 647 BTU/h - Single Split / Cassete Rp 712,000
Unit AC Single Split 3 1/4 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.857 Rp 155,000.00 Rp 132,857
Kepala tukang hari 1.714 Rp 155,000.00 Rp 265,714
Tukang hari 1.714 Rp 145,000.00 Rp 248,571
Jumlah Rp 647,143
Keuntungan 10% Rp 64,714
Total = Jumlah+(Keuntungan 10%) Rp 711,857
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 22 000 BTU/h - Single Split / Cassete Rp 712,000
Analisa Harga Satuan Pekerjaan MEP - page 169 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Unit AC Single Split 2 1/2 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.857 Rp 155,000.00 Rp 132,857
Kepala tukang hari 1.714 Rp 155,000.00 Rp 265,714
Tukang hari 1.714 Rp 145,000.00 Rp 248,571
Jumlah Rp 647,143
Keuntungan 10% Rp 64,714
Total = Jumlah+(Keuntungan 10%) Rp 711,857
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 29 385 BTU/h - Single Split / Cassete Rp 712,000
Unit AC Single Split 3 1/4 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.857 Rp 155,000.00 Rp 132,857
Kepala tukang hari 1.714 Rp 155,000.00 Rp 265,714
Tukang hari 1.714 Rp 145,000.00 Rp 248,571
Jumlah Rp 647,143
Keuntungan 10% Rp 64,714
Total = Jumlah+(Keuntungan 10%) Rp 711,857
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 22 201 BTU/h - Single Split / Cassete Rp 712,000
Unit AC Single Split 2 1/2 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.857 Rp 155,000.00 Rp 132,857
Kepala tukang hari 1.714 Rp 155,000.00 Rp 265,714
Tukang hari 1.714 Rp 145,000.00 Rp 248,571
Jumlah Rp 647,143
Keuntungan 10% Rp 64,714
Total = Jumlah+(Keuntungan 10%) Rp 711,857
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 11 650 BTU/h - Single Split / Cassete Rp 712,000
Unit AC Single Split 1 1/2 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.857 Rp 155,000.00 Rp 132,857
Kepala tukang hari 1.714 Rp 155,000.00 Rp 265,714
Tukang hari 1.714 Rp 145,000.00 Rp 248,571
Jumlah Rp 647,143
Keuntungan 10% Rp 64,714
Total = Jumlah+(Keuntungan 10%) Rp 711,857
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 19 565 BTU/h - Single Split / Cassete Rp 712,000
Unit AC Single Split 2 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.857 Rp 155,000.00 Rp 132,857
Kepala tukang hari 1.714 Rp 155,000.00 Rp 265,714
Tukang hari 1.714 Rp 145,000.00 Rp 248,571
Jumlah Rp 647,143
Keuntungan 10% Rp 64,714
Total = Jumlah+(Keuntungan 10%) Rp 711,857
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 22 094 BTU/h - Single Split / Cassete Rp 712,000
Unit AC Single Split 2 1/2 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.857 Rp 155,000.00 Rp 132,857
Kepala tukang hari 1.714 Rp 155,000.00 Rp 265,714
Tukang hari 1.714 Rp 145,000.00 Rp 248,571
Jumlah Rp 647,143
Keuntungan 10% Rp 64,714
Total = Jumlah+(Keuntungan 10%) Rp 711,857
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 28 838 BTU/h - Single Split / Cassete Rp 712,000
Unit AC Single Split 3 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.857 Rp 155,000.00 Rp 132,857
Kepala tukang hari 1.714 Rp 155,000.00 Rp 265,714
Tukang hari 1.714 Rp 145,000.00 Rp 248,571
Jumlah Rp 647,143
Keuntungan 10% Rp 64,714
Total = Jumlah+(Keuntungan 10%) Rp 711,857
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 38 456 BTU/h - Single Split / Cassete Rp 712,000
Unit AC Single Split 4 1/4 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.857 Rp 155,000.00 Rp 132,857
Kepala tukang hari 1.714 Rp 155,000.00 Rp 265,714
Tukang hari 1.714 Rp 145,000.00 Rp 248,571
Jumlah Rp 647,143
Keuntungan 10% Rp 64,714
Total = Jumlah+(Keuntungan 10%) Rp 711,857
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 27 241 BTU/h - Single Split / Cassete Rp 712,000
Unit AC Single Split 3 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.857 Rp 155,000.00 Rp 132,857
Kepala tukang hari 1.714 Rp 155,000.00 Rp 265,714
Tukang hari 1.714 Rp 145,000.00 Rp 248,571
Jumlah Rp 647,143
Keuntungan 10% Rp 64,714
Analisa Harga Satuan Pekerjaan MEP - page 170 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Total = Jumlah+(Keuntungan 10%) Rp 711,857
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 2 819 BTU/h - Single Split / Wall Rp 380,000
Unit AC Single Split 1/4 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 345,714
Keuntungan 10% Rp 34,571
Total = Jumlah+(Keuntungan 10%) Rp 380,286
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 11 933 BTU/h - Single Split / Wall Rp 6,733,000
Unit AC Single Split 1 1/2 PK bh 1.000 Rp 5,500,000.00 Rp 5,500,000
Alat bantu Set 1.000 Rp 275,000.00 Rp 275,000
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 6,120,714
Keuntungan 10% Rp 612,071
Total = Jumlah+(Keuntungan 10%) Rp 6,732,786
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 7 419 BTU/h - Single Split / Wall Rp 380,000
Unit AC Single Split 3/4 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 345,714
Keuntungan 10% Rp 34,571
Total = Jumlah+(Keuntungan 10%) Rp 380,286
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 12 145 BTU/h - Single Split / Wall Rp 6,733,000
Unit AC Single Split 1 1/2 PK bh 1.000 Rp 5,500,000.00 Rp 5,500,000
Alat bantu Set 1.000 Rp 275,000.00 Rp 275,000
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 6,120,714
Keuntungan 10% Rp 612,071
Total = Jumlah+(Keuntungan 10%) Rp 6,732,786
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 9 167 BTU/h - Single Split / Wall Rp 380,000
Unit AC Single Split 1 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 345,714
Keuntungan 10% Rp 34,571
Total = Jumlah+(Keuntungan 10%) Rp 380,286
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 12 921 BTU/h - Single Split / Wall Rp 6,733,000
Unit AC Single Split 1 1/2PK bh 1.000 Rp 5,500,000.00 Rp 5,500,000
Alat bantu Set 1.000 Rp 275,000.00 Rp 275,000
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 6,120,714
Keuntungan 10% Rp 612,071
Total = Jumlah+(Keuntungan 10%) Rp 6,732,786
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 12 145 BTU/h - Single Split / Wall Rp 6,733,000
Unit AC Single Split 1 1/2PK bh 1.000 Rp 5,500,000.00 Rp 5,500,000
Alat bantu Set 1.000 Rp 275,000.00 Rp 275,000
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 6,120,714
Keuntungan 10% Rp 612,071
Total = Jumlah+(Keuntungan 10%) Rp 6,732,786
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 12 146 BTU/h - Single Split / Wall Rp 6,733,000
Unit AC Single Split 1 1/2PK bh 1.000 Rp 5,500,000.00 Rp 5,500,000
Alat bantu Set 1.000 Rp 275,000.00 Rp 275,000
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 6,120,714
Keuntungan 10% Rp 612,071
Total = Jumlah+(Keuntungan 10%) Rp 6,732,786
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 12 841 BTU/h - Single Split / Wall Rp 6,733,000
Unit AC Single Split 1 1/2PK bh 1.000 Rp 5,500,000.00 Rp 5,500,000
Alat bantu Set 1.000 Rp 275,000.00 Rp 275,000
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Analisa Harga Satuan Pekerjaan MEP - page 171 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Jumlah Rp 6,120,714
Keuntungan 10% Rp 612,071
Total = Jumlah+(Keuntungan 10%) Rp 6,732,786
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 9 166 BTU/h - Single Split / Wall Rp 380,000
Unit AC Single Split 1 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 345,714
Keuntungan 10% Rp 34,571
Total = Jumlah+(Keuntungan 10%) Rp 380,286
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 12 348 BTU/h - Single Split / Wall Rp 6,733,000
Unit AC Single Split 1 1/2 PK bh 1.000 Rp 5,500,000.00 Rp 5,500,000
Alat bantu Set 1.000 Rp 275,000.00 Rp 275,000
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 6,120,714
Keuntungan 10% Rp 612,071
Total = Jumlah+(Keuntungan 10%) Rp 6,732,786
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 2 831 BTU/h - Single Split / Wall Rp 380,000
Unit AC Single Split 1/4 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 345,714
Keuntungan 10% Rp 34,571
Total = Jumlah+(Keuntungan 10%) Rp 380,286
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 7 513 BTU/h - Single Split / Wall Rp 380,000
Unit AC Single Split 3/4 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 345,714
Keuntungan 10% Rp 34,571
Total = Jumlah+(Keuntungan 10%) Rp 380,286
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 9 592 BTU/h - Single Split / Wall Rp 380,000
Unit AC Single Split 1 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 345,714
Keuntungan 10% Rp 34,571
Total = Jumlah+(Keuntungan 10%) Rp 380,286
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 16 517 BTU/h - Single Split / Wall Rp 380,000
Unit AC Single Split 1 3/4 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 345,714
Keuntungan 10% Rp 34,571
Total = Jumlah+(Keuntungan 10%) Rp 380,286

1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 16 517 BTU/h - Single Split / Wall Rp 380,000
AC Split kapasitas : 2 3/4 PK - Wall type bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.571 Rp 155,000.00 Rp 88,571
Kepala tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 345,714
Keuntungan 10% Rp 34,571
Total = Jumlah+(Keuntungan 10%) Rp 380,286

1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 5 073 BTU/h - Single Split / Wall Rp -
Unit AC Single Split 1/2 PK bh 1.000 Rp - Rp -

Upah Pasang set 1.000 Rp -


Jumlah Rp -
Keuntungan 10% Rp -
Total = Jumlah+(Keuntungan 10%) Rp -
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 3 322 BTU/h - Single Split / Wall Rp -
Unit AC Single Split 1/4 PK bh 1.000 Rp - Rp -

Upah Pasang set 1.000 Rp -


Jumlah Rp -
Keuntungan 10% Rp -
Analisa Harga Satuan Pekerjaan MEP - page 172 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Total = Jumlah+(Keuntungan 10%) Rp -
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 13 420 BTU/h - Single Split / Wall Rp 6,050,000
Unit AC Single Split 1 1/2 PK bh 1.000 Rp 5,500,000.00 Rp 5,500,000

Upah Pasang set 1.000 Rp -


Jumlah Rp 5,500,000
Keuntungan 10% Rp 550,000
Total = Jumlah+(Keuntungan 10%) Rp 6,050,000
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 8 016 BTU/h - Single Split / Wall Rp -
Unit AC Single Split 1 PK bh 1.000 Rp - Rp -

Upah Pasang set 1.000 Rp -


Jumlah Rp -
Keuntungan 10% Rp -
Total = Jumlah+(Keuntungan 10%) Rp -
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 8 125 BTU/h - Single Split / Wall Rp -
Unit AC Single Split 1 PK bh 1.000 Rp - Rp -

Upah Pasang set 1.000 Rp -


Jumlah Rp -
Keuntungan 10% Rp -
Total = Jumlah+(Keuntungan 10%) Rp -
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 7 070 BTU/h - Single Split / Wall Rp -
Unit AC Single Split 3/4 PK bh 1.000 Rp - Rp -

Upah Pasang set 1.000 Rp -


Jumlah Rp -
Keuntungan 10% Rp -
Total = Jumlah+(Keuntungan 10%) Rp -
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 14 583 BTU/h - Single Split / Cassete Rp -
Unit AC Single Split 1 3/4 PK bh 1.000 Rp - Rp -

Upah Pasang set 1.000 Rp -


Jumlah Rp -
Keuntungan 10% Rp -
Total = Jumlah+(Keuntungan 10%) Rp -
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 28 477 BTU/h - Single Split / Cassete Rp 385,000
Unit AC Single Split 3 1/4 PK bh 1.000 Rp - Rp -

Upah Pasang set 1.000 Rp 350,000.00 Rp 350,000


Jumlah Rp 350,000
Keuntungan 10% Rp 35,000
Total = Jumlah+(Keuntungan 10%) Rp 385,000
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 24 309 BTU/h - Single Split / Cassete Rp 712,000
Unit AC Single Split 2 1/2 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.857 Rp 155,000.00 Rp 132,857
Kepala tukang hari 1.714 Rp 155,000.00 Rp 265,714
Tukang hari 1.714 Rp 145,000.00 Rp 248,571
Jumlah Rp 647,143
Keuntungan 10% Rp 64,714
Total = Jumlah+(Keuntungan 10%) Rp 711,857
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 29 388 BTU/h - Single Split / Cassete Rp 712,000
Unit AC Single Split 3 1/4 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.857 Rp 155,000.00 Rp 132,857
Kepala tukang hari 1.714 Rp 155,000.00 Rp 265,714
Tukang hari 1.714 Rp 145,000.00 Rp 248,571
Jumlah Rp 647,143
Keuntungan 10% Rp 64,714
Total = Jumlah+(Keuntungan 10%) Rp 711,857
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 28 234 BTU/h - Single Split / Cassete Rp 712,000
Unit AC Single Split 3 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.857 Rp 155,000.00 Rp 132,857
Kepala tukang hari 1.714 Rp 155,000.00 Rp 265,714
Tukang hari 1.714 Rp 145,000.00 Rp 248,571
Jumlah Rp 647,143
Keuntungan 10% Rp 64,714
Total = Jumlah+(Keuntungan 10%) Rp 711,857
1 UNIT Pengadaan & Pemasangan Indoor dan Outdoor Unit ( IU+OU ) kap. 13 185 BTU/h - Single Split / Cassete Rp 712,000
Unit AC Single Split 1 3/4 PK bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Tenaga Kerja :
Mandor hari 0.857 Rp 155,000.00 Rp 132,857
Kepala tukang hari 1.714 Rp 155,000.00 Rp 265,714
Tukang hari 1.714 Rp 145,000.00 Rp 248,571
Jumlah Rp 647,143
Keuntungan 10% Rp 64,714
Total = Jumlah+(Keuntungan 10%) Rp 711,857

1 m' Pengadaan & Pemasangan Pipa Refrigerant + isolasi dia. 3/4 " Rp 245,000
Pipa Refrigerant dia. 3/4 " m' 1.000 Rp 150,000.00 Rp 150,000
Iisolasi dia. 3/4 " m' 1.000 Rp 12,000.00 Rp 12,000
Alat bantu Set 1.000 Rp 37,500.00 Rp 37,500
Analisa Harga Satuan Pekerjaan MEP - page 173 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Tenaga Kerja :
Mandor hari 0.014 Rp 155,000.00 Rp 2,214
Kepala tukang hari 0.071 Rp 155,000.00 Rp 11,071
Tukang hari 0.071 Rp 145,000.00 Rp 10,357
Jumlah Rp 223,143
Keuntungan 10% Rp 22,314
Total = Jumlah+(Keuntungan 10%) Rp 245,457

1 m' Pengadaan & Pemasangan Pipa Refrigerant + isolasi dia. 3/8 " Rp 293,000
Pipa Refrigerant dia. 3/8 " m' 1.000 Rp 186,000.00 Rp 186,000
Iisolasi dia. 3/8 " m' 1.000 Rp 10,000.00 Rp 10,000
Alat bantu Set 1.000 Rp 46,500.00 Rp 46,500
Tenaga Kerja :
Mandor hari 0.014 Rp 155,000.00 Rp 2,214
Kepala tukang hari 0.071 Rp 155,000.00 Rp 11,071
Tukang hari 0.071 Rp 145,000.00 Rp 10,357
Jumlah Rp 266,143
Keuntungan 10% Rp 26,614
Total = Jumlah+(Keuntungan 10%) Rp 292,757

1m Pengadaan & Pemasangan Pipa Drain + isolasi dia. 2 " Rp 88,000


Pipa Drain PVC di.a 2" m' 1.000 Rp 23,900.00 Rp 23,900
Isolasi pipa di.a 2" m' 1.000 Rp 23,000.00 Rp 23,000
Alat bantu Set 1.000 Rp 9,380.00 Rp 9,380
Tenaga Kerja :
Mandor hari 0.014 Rp 155,000.00 Rp 2,214
Kepala tukang hari 0.071 Rp 155,000.00 Rp 11,071
Tukang hari 0.071 Rp 145,000.00 Rp 10,357
Jumlah Rp 79,923
Keuntungan 10% Rp 7,992
Total = Jumlah+(Keuntungan 10%) Rp 87,915
1m Pengadaan & Pemasangan Pipa Drain + isolasi dia. 1 1/2 " Rp 76,000
Pipa Drain PVC di.a 1 1/2" m' 1.000 Rp 18,500.00 Rp 18,500
Isolasi pipa di.a 1 1/2" m' 1.000 Rp 19,000.00 Rp 19,000
Alat bantu Set 1.000 Rp 7,500.00 Rp 7,500
Tenaga Kerja :
Mandor hari 0.014 Rp 155,000.00 Rp 2,214
Kepala tukang hari 0.071 Rp 155,000.00 Rp 11,071
Tukang hari 0.071 Rp 145,000.00 Rp 10,357
Jumlah Rp 68,643
Keuntungan 10% Rp 6,864
Total = Jumlah+(Keuntungan 10%) Rp 75,507
1m Pengadaan & Pemasangan Pipa Drain + isolasi dia. 1 " Rp 59,000
Pipa Drain PVC di.a 1 " m' 1.000 Rp 10,200.00 Rp 10,200
Isolasi pipa di.a 1 " m' 1.000 Rp 15,000.00 Rp 15,000
Alat bantu Set 1.000 Rp 5,040.00 Rp 5,040
Tenaga Kerja :
Mandor hari 0.014 Rp 155,000.00 Rp 2,214
Kepala tukang hari 0.071 Rp 155,000.00 Rp 11,071
Tukang hari 0.071 Rp 145,000.00 Rp 10,357
Jumlah Rp 53,883
Keuntungan 10% Rp 5,388
Total = Jumlah+(Keuntungan 10%) Rp 59,271
1m Pengadaan & Pemasangan Pipa Drain + isolasi dia. 3/4 " Rp 53,000
Pipa Drain PVC di.a 3/4 " m' 1.000 Rp 8,200.00 Rp 8,200
Isolasi pipa di.a 3/4 " m' 1.000 Rp 12,000.00 Rp 12,000
Alat bantu Set 1.000 Rp 4,040.00 Rp 4,040
Tenaga Kerja :
Mandor hari 0.014 Rp 155,000.00 Rp 2,214
Kepala tukang hari 0.071 Rp 155,000.00 Rp 11,071
Tukang hari 0.071 Rp 145,000.00 Rp 10,357
Jumlah Rp 47,883
Keuntungan 10% Rp 4,788
Total = Jumlah+(Keuntungan 10%) Rp 52,671
1m Pengadaan & Pemasangan Pipa Drain + isolasi dia. 1/2 " Rp 45,000
Pipa Drain PVC di.a 1/2 " m' 1.000 Rp 5,500.00 Rp 5,500
Isolasi pipa di.a 1/2 " m' 1.000 Rp 9,000.00 Rp 9,000
Alat bantu Set 1.000 Rp 2,900.00 Rp 2,900
Tenaga Kerja :
Mandor hari 0.014 Rp 155,000.00 Rp 2,214
Kepala tukang hari 0.071 Rp 155,000.00 Rp 11,071
Tukang hari 0.071 Rp 145,000.00 Rp 10,357
Jumlah Rp 41,043
Keuntungan 10% Rp 4,104
Total = Jumlah+(Keuntungan 10%) Rp 45,147
1 UNIT Pengadaan & pemasanga Hand Valve DIAMETER : 3/8 INCH Rp 546,000
Hand valve dia. 3/8 " m' 1.000 Rp 450,000.00 Rp 450,000
Alat bantu Set 1.000 Rp 22,500.00 Rp 22,500
Tenaga Kerja :
Mandor hari 0.014 Rp 155,000.00 Rp 2,214
Kepala tukang hari 0.071 Rp 155,000.00 Rp 11,071
Tukang hari 0.071 Rp 145,000.00 Rp 10,357
Jumlah Rp 496,143
Keuntungan 10% Rp 49,614
Total = Jumlah+(Keuntungan 10%) Rp 545,757

1 BH Pengadaan & Pemasangan Exhaust Fan , Kapasitas : 250 CFM/ Wall Type Rp 266,000
Exhaust Fan, Kapasitas : 250 CFM, Wall type bh 1.000 Rp - Rp -
Analisa Harga Satuan Pekerjaan MEP - page 174 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Alat bantu Set 1.000 Rp - Rp -
Mandor hari 0.179 Rp 155,000.00 Rp 27,679
Kepala Tukang hari 0.714 Rp 155,000.00 Rp 110,714
Tukang hari 0.714 Rp 145,000.00 Rp 103,571
Jumlah Rp 241,964
Keuntungan 10% Rp 24,196
Total = Jumlah+(Keuntungan 10%) Rp 266,161

1 BH Pengadaan & Pemasangan Exhaust Fan , Kapasitas : 300 CFM/ Wall Type Rp 266,000
Exhaust Fan, Kapasitas : 300 CFM, Wall type bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Mandor hari 0.179 Rp 155,000.00 Rp 27,679
Kepala Tukang hari 0.714 Rp 155,000.00 Rp 110,714
Tukang hari 0.714 Rp 145,000.00 Rp 103,571
Jumlah Rp 241,964
Keuntungan 10% Rp 24,196
Total = Jumlah+(Keuntungan 10%) Rp 266,161

1 BH Pengadaan & Pemasangan Exhaust Fan , Kapasitas : 350 CFM / Wall Type Rp 266,000
Exhaust Fan, Kapasitas : 350 CFM, Inline type bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Mandor hari 0.179 Rp 155,000.00 Rp 27,679
Kepala Tukang hari 0.714 Rp 155,000.00 Rp 110,714
Tukang hari 0.714 Rp 145,000.00 Rp 103,571
Jumlah Rp 241,964
Keuntungan 10% Rp 24,196
Total = Jumlah+(Keuntungan 10%) Rp 266,161
1 BH Pengadaan & Pemasangan Exhaust Fan , Kapasitas : 400 CFM/ Wall Type Rp 266,000
Exhaust Fan, Kapasitas : 400 CFM, Wall type bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Mandor hari 0.179 Rp 155,000.00 Rp 27,679
Kepala Tukang hari 0.714 Rp 155,000.00 Rp 110,714
Tukang hari 0.714 Rp 145,000.00 Rp 103,571
Jumlah Rp 241,964
Keuntungan 10% Rp 24,196
Total = Jumlah+(Keuntungan 10%) Rp 266,161
1 BH Pengadaan & Pemasangan Exhaust Fan , Kapasitas : 250 CFM/ Inline Type Rp 266,000
Exhaust Fan, Kapasitas : 250 CFM, Inline type bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Mandor hari 0.179 Rp 155,000.00 Rp 27,679
Kepala Tukang hari 0.714 Rp 155,000.00 Rp 110,714
Tukang hari 0.714 Rp 145,000.00 Rp 103,571
Jumlah Rp 241,964
Keuntungan 10% Rp 24,196
Total = Jumlah+(Keuntungan 10%) Rp 266,161
1 BH Pengadaan & Pemasangan Exhaust Fan , Kapasitas : 300 CFM/ Inline Type Rp 3,291,000
Exhaust Fan, Kapasitas : 300 CFM, Inline type bh 1.000 Rp 2,500,000.00 Rp 2,500,000
Alat bantu Set 1.000 Rp 250,000.00 Rp 250,000
Mandor hari 0.179 Rp 155,000.00 Rp 27,679
Kepala Tukang hari 0.714 Rp 155,000.00 Rp 110,714
Tukang hari 0.714 Rp 145,000.00 Rp 103,571
Jumlah Rp 2,991,964
Keuntungan 10% Rp 299,196
Total = Jumlah+(Keuntungan 10%) Rp 3,291,161
1 BH Pengadaan & Pemasangan Exhaust Fan , Kapasitas : 400 CFM/ Inline Type Rp 266,000
Exhaust Fan, Kapasitas : 400 CFM, Inline type bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Mandor hari 0.179 Rp 155,000.00 Rp 27,679
Kepala Tukang hari 0.714 Rp 155,000.00 Rp 110,714
Tukang hari 0.714 Rp 145,000.00 Rp 103,571
Jumlah Rp 241,964
Keuntungan 10% Rp 24,196
Total = Jumlah+(Keuntungan 10%) Rp 266,161

1 BH Pengadaan & Pemasangan Exhaust Fan , Kapasitas : 450 CFM/ Inline Type Rp 266,000
Exhaust Fan, Kapasitas : 450 CFM, Inline type bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Mandor hari 0.179 Rp 155,000.00 Rp 27,679
Kepala Tukang hari 0.714 Rp 155,000.00 Rp 110,714
Tukang hari 0.714 Rp 145,000.00 Rp 103,571
Jumlah Rp 241,964
Keuntungan 10% Rp 24,196
Total = Jumlah+(Keuntungan 10%) Rp 266,161

1 BH Pengadaan & Pemasangan Exhaust Fan , Kapasitas : 750 CFM/ Inline Type Rp 266,000
Exhaust Fan, Kapasitas : 750 CFM, Inline type bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Mandor hari 0.179 Rp 155,000.00 Rp 27,679
Kepala Tukang hari 0.714 Rp 155,000.00 Rp 110,714
Tukang hari 0.714 Rp 145,000.00 Rp 103,571
Jumlah Rp 241,964
Keuntungan 10% Rp 24,196
Total = Jumlah+(Keuntungan 10%) Rp 266,161
1 BH Pengadaan & Pemasangan Exhaust Fan , Kapasitas : 800 CFM/ InlineType Rp 266,000
Exhaust Fan, Kapasitas : 800 CFM, Inline type bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Mandor hari 0.179 Rp 155,000.00 Rp 27,679
Kepala Tukang hari 0.714 Rp 155,000.00 Rp 110,714
Analisa Harga Satuan Pekerjaan MEP - page 175 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Tukang hari 0.714 Rp 145,000.00 Rp 103,571
Jumlah Rp 241,964
Keuntungan 10% Rp 24,196
Total = Jumlah+(Keuntungan 10%) Rp 266,161
1 BH Pengadaan & Pemasangan Exhaust Fan , Kapasitas : 900 CFM/ InlineType Rp 266,000
Exhaust Fan, Kapasitas : 900 CFM, Inline type bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Mandor hari 0.179 Rp 155,000.00 Rp 27,679
Kepala Tukang hari 0.714 Rp 155,000.00 Rp 110,714
Tukang hari 0.714 Rp 145,000.00 Rp 103,571
Jumlah Rp 241,964
Keuntungan 10% Rp 24,196
Total = Jumlah+(Keuntungan 10%) Rp 266,161
1 BH Pengadaan & Pemasangan Exhaust Fan , Kapasitas : 1200 CFM/ InlineType Rp 266,000
Exhaust Fan, Kapasitas : 1200 CFM, Wall type bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Mandor hari 0.179 Rp 155,000.00 Rp 27,679
Kepala Tukang hari 0.714 Rp 155,000.00 Rp 110,714
Tukang hari 0.714 Rp 145,000.00 Rp 103,571
Jumlah Rp 241,964
Keuntungan 10% Rp 24,196
Total = Jumlah+(Keuntungan 10%) Rp 266,161
1 BH Pengadaan & Pemasangan Exhaust Fan , Kapasitas : 1260 CFM/ InlineType Rp 266,000
Exhaust Fan, Kapasitas : 1260 CFM, Wall type bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Mandor hari 0.179 Rp 155,000.00 Rp 27,679
Kepala Tukang hari 0.714 Rp 155,000.00 Rp 110,714
Tukang hari 0.714 Rp 145,000.00 Rp 103,571
Jumlah Rp 241,964
Keuntungan 10% Rp 24,196
Total = Jumlah+(Keuntungan 10%) Rp 266,161
1 BH Pengadaan & Pemasangan Exhaust Fan , Kapasitas : 2000 CFM/ InlineType Rp 266,000
Exhaust Fan, Kapasitas : 2000 CFM, Wall type bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Mandor hari 0.179 Rp 155,000.00 Rp 27,679
Kepala Tukang hari 0.714 Rp 155,000.00 Rp 110,714
Tukang hari 0.714 Rp 145,000.00 Rp 103,571
Jumlah Rp 241,964
Keuntungan 10% Rp 24,196
Total = Jumlah+(Keuntungan 10%) Rp 266,161

1 BH Pengadaan & Pemasangan Fan Filter , Kapasitas : 1600 CFM/ InlineType Rp 266,000
Fan Filter Unit, Kapasitas : 1600 CFM, Inline type bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Mandor hari 0.179 Rp 155,000.00 Rp 27,679
Kepala Tukang hari 0.714 Rp 155,000.00 Rp 110,714
Tukang hari 0.714 Rp 145,000.00 Rp 103,571
Jumlah Rp 241,964
Keuntungan 10% Rp 24,196
Total = Jumlah+(Keuntungan 10%) Rp 266,161

1 BH Pengadaan & Pemasangan Fan Filter , Kapasitas : 1200 CFM/ InlineType Rp 266,000
Fan Filter Unit, Kapasitas : 1200 CFM, Inline type bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Mandor hari 0.179 Rp 155,000.00 Rp 27,679
Kepala Tukang hari 0.714 Rp 155,000.00 Rp 110,714
Tukang hari 0.714 Rp 145,000.00 Rp 103,571
Jumlah Rp 241,964
Keuntungan 10% Rp 24,196
Total = Jumlah+(Keuntungan 10%) Rp 266,161
1 BH Pengadaan & Pemasangan Fan Filter , Kapasitas : 1100 CFM/ InlineType Rp 266,000
Fan Filter Unit, Kapasitas : 1100 CFM, Inline type bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Mandor hari 0.179 Rp 155,000.00 Rp 27,679
Kepala Tukang hari 0.714 Rp 155,000.00 Rp 110,714
Tukang hari 0.714 Rp 145,000.00 Rp 103,571
Jumlah Rp 241,964
Keuntungan 10% Rp 24,196
Total = Jumlah+(Keuntungan 10%) Rp 266,161

1 BH Pengadaan & Pemasangan Fan Filter , Kapasitas : 930 CFM/ InlineType Rp 266,000
Fan Filter Unit, Kapasitas : 1200 CFM, Inline type bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Mandor hari 0.179 Rp 155,000.00 Rp 27,679
Kepala Tukang hari 0.714 Rp 155,000.00 Rp 110,714
Tukang hari 0.714 Rp 145,000.00 Rp 103,571
Jumlah Rp 241,964
Keuntungan 10% Rp 24,196
Total = Jumlah+(Keuntungan 10%) Rp 266,161

1 BH Pengadaan & Pemasangan Fan Filter , Kapasitas : 800 CFM/ InlineType Rp 266,000
Fan Filter Unit, Kapasitas : 800 CFM, Inline type bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Mandor hari 0.179 Rp 155,000.00 Rp 27,679
Kepala Tukang hari 0.714 Rp 155,000.00 Rp 110,714
Tukang hari 0.714 Rp 145,000.00 Rp 103,571
Analisa Harga Satuan Pekerjaan MEP - page 176 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Jumlah Rp 241,964
Keuntungan 10% Rp 24,196
Total = Jumlah+(Keuntungan 10%) Rp 266,161
1 BH Pengadaan & Pemasangan Fan Filter , Kapasitas : 813 CFM/ InlineType Rp 266,000
Fan Filter Unit, Kapasitas : 813 CFM, Inline type bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Mandor hari 0.179 Rp 155,000.00 Rp 27,679
Kepala Tukang hari 0.714 Rp 155,000.00 Rp 110,714
Tukang hari 0.714 Rp 145,000.00 Rp 103,571
Jumlah Rp 241,964
Keuntungan 10% Rp 24,196
Total = Jumlah+(Keuntungan 10%) Rp 266,161
1 BH Pengadaan & Pemasangan Intake Fan Axial Inline Type, Kap. 550 CFM Rp 266,000
Intake Fan, Kapasitas : 550 CFM, Inline type bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Mandor hari 0.179 Rp 155,000.00 Rp 27,679
Kepala Tukang hari 0.714 Rp 155,000.00 Rp 110,714
Tukang hari 0.714 Rp 145,000.00 Rp 103,571
Jumlah Rp 241,964
Keuntungan 10% Rp 24,196
Total = Jumlah+(Keuntungan 10%) Rp 266,161

1 BH Pengadaan & Pemasangan Intake Fan Axial Inline Type, Kap. 150 CFM Rp 266,000
Intake Fan, Kapasitas : 150 CFM, Inline type bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Mandor hari 0.179 Rp 155,000.00 Rp 27,679
Kepala Tukang hari 0.714 Rp 155,000.00 Rp 110,714
Tukang hari 0.714 Rp 145,000.00 Rp 103,571
Jumlah Rp 241,964
Keuntungan 10% Rp 24,196
Total = Jumlah+(Keuntungan 10%) Rp 266,161
1 BH Pengadaan & Pemasangan Intake Fan Axial Inline Type, Kap. 100 CFM Rp 266,000
Intake Fan, Kapasitas : 100 CFM, Inline type bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Mandor hari 0.179 Rp 155,000.00 Rp 27,679
Kepala Tukang hari 0.714 Rp 155,000.00 Rp 110,714
Tukang hari 0.714 Rp 145,000.00 Rp 103,571
Jumlah Rp 241,964
Keuntungan 10% Rp 24,196
Total = Jumlah+(Keuntungan 10%) Rp 266,161
1 BH Pengadaan & Pemasangan Intake Fan Axial Inline Type, Kap. 7000 CFM Rp 266,000
Intake Fan , Kapasitas : 7000 CFM, Inline type bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Mandor hari 0.179 Rp 155,000.00 Rp 27,679
Kepala Tukang hari 0.714 Rp 155,000.00 Rp 110,714
Tukang hari 0.714 Rp 145,000.00 Rp 103,571
Jumlah Rp 241,964
Keuntungan 10% Rp 24,196
Total = Jumlah+(Keuntungan 10%) Rp 266,161
1 BH Pengadaan & Pemasangan Intake Fan Axial Inline Type, Kap. 1226 CFM Rp 266,000
Exhaust Fan, Kapasitas : 1260 CFM, Wall type bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Mandor hari 0.179 Rp 155,000.00 Rp 27,679
Kepala Tukang hari 0.714 Rp 155,000.00 Rp 110,714
Tukang hari 0.714 Rp 145,000.00 Rp 103,571
Jumlah Rp 241,964
Keuntungan 10% Rp 24,196
Total = Jumlah+(Keuntungan 10%) Rp 266,161
1 BH Pengadaan & Pemasangan Intake Fan Axial Inline Type, Kap. 1029 CFM Rp 266,000
Exhaust Fan, Kapasitas : 1029 CFM, Wall type bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Mandor hari 0.179 Rp 155,000.00 Rp 27,679
Kepala Tukang hari 0.714 Rp 155,000.00 Rp 110,714
Tukang hari 0.714 Rp 145,000.00 Rp 103,571
Jumlah Rp 241,964
Keuntungan 10% Rp 24,196
Total = Jumlah+(Keuntungan 10%) Rp 266,161
1 BH Pengadaan & Pemasangan Extract Fan Ceiling Type, Kap. 200 CFM Rp 266,000
Extract Fan, Kapasitas : 200 CFM, Ceiling type bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Mandor hari 0.179 Rp 155,000.00 Rp 27,679
Kepala Tukang hari 0.714 Rp 155,000.00 Rp 110,714
Tukang hari 0.714 Rp 145,000.00 Rp 103,571
Jumlah Rp 241,964
Keuntungan 10% Rp 24,196
Total = Jumlah+(Keuntungan 10%) Rp 266,161
1 BH Pengadaan & Pemasangan Extract Fan Ceiling Type, Kap. 150 CFM Rp 266,000
Extract Fan, Kapasitas : 150 CFM, Ceiling type bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Mandor hari 0.179 Rp 155,000.00 Rp 27,679
Kepala Tukang hari 0.714 Rp 155,000.00 Rp 110,714
Tukang hari 0.714 Rp 145,000.00 Rp 103,571
Jumlah Rp 241,964
Keuntungan 10% Rp 24,196
Total = Jumlah+(Keuntungan 10%) Rp 266,161

1 BH Pengadaan & Pemasangan Extract Fan Ceiling Type, Kap. 100 CFM Rp 1,053,000
Extract Fan, Kapasitas : 100 CFM, Ceiling type bh 1.000 Rp 650,000.00 Rp 650,000
Analisa Harga Satuan Pekerjaan MEP - page 177 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Alat bantu Set 1.000 Rp 65,000.00 Rp 65,000
Mandor hari 0.179 Rp 155,000.00 Rp 27,679
Kepala Tukang hari 0.714 Rp 155,000.00 Rp 110,714
Tukang hari 0.714 Rp 145,000.00 Rp 103,571
Jumlah Rp 956,964
Keuntungan 10% Rp 95,696
Total = Jumlah+(Keuntungan 10%) Rp 1,052,661
1 BH Pengadaan & Pemasangan Extract Fan Ceiling Type, Kap. 50 CFM Rp 266,000
Extract Fan, Kapasitas : 50 CFM, Ceiling type bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Mandor hari 0.179 Rp 155,000.00 Rp 27,679
Kepala Tukang hari 0.714 Rp 155,000.00 Rp 110,714
Tukang hari 0.714 Rp 145,000.00 Rp 103,571
Jumlah Rp 241,964
Keuntungan 10% Rp 24,196
Total = Jumlah+(Keuntungan 10%) Rp 266,161

1 BH Pengadaan & Pemasangan Exhaust Fan Axial Inline Type, Kap. 7500 CFM Rp 266,000
Exhaust Fan , Kapasitas : 7500 CFM, Inline type bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Mandor hari 0.179 Rp 155,000.00 Rp 27,679
Kepala Tukang hari 0.714 Rp 155,000.00 Rp 110,714
Tukang hari 0.714 Rp 145,000.00 Rp 103,571
Jumlah Rp 241,964
Keuntungan 10% Rp 24,196
Total = Jumlah+(Keuntungan 10%) Rp 266,161
1 BH Pengadaan & Pemasangan Exhaust Fan Axial Inline Type, Kap. 9000 CFM Rp 319,000
Exhaust Fan, Kapasitas : 9000 CFM, Inline type bh 1.000 Rp - Rp -
Alat bantu Set 1.000 Rp - Rp -
Mandor hari 0.214 Rp 155,000.00 Rp 33,214
Kepala Tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 290,357
Keuntungan 10% Rp 29,036
Total = Jumlah+(Keuntungan 10%) Rp 319,393

1 M2 Pengadaan & Pemasangan DUCTING AC BERISOLASI Rp -


BJLS 80 lengkap dengan Isolasi, m2 1.000 Rp - Rp -
Flexycell XLPE material, dencity >25 Kg/m3 , K= (0,03-0,04) W/mK,
Fire Retardant Class O (Std BS 476) min thickness 25 mm w/ Self Adhesive
tapes m2' 1.000 Rp - Rp -
Penunjang lainnya lot 1.000 Rp - Rp -
Penggantung buah 0.500 Rp - Rp -
Jumlah Rp -
Keuntungan 10% Rp -
Total = Jumlah+(Keuntungan 10%) Rp -
1 M2 Pengadaan & Pemasangan DUCTING AC TANPA ISOLASI Rp -
BJLS 80 m2 1.000 Rp - Rp -
Penunjang lainnya lot 1.000 Rp - Rp -
Penggantung buah 0.500 Rp - Rp -
Jumlah Rp -
Keuntungan 10% Rp -
Total = Jumlah+(Keuntungan 10%) Rp -

1 M2 Pengadaan & Pemasangan DUCTING EXHAUSE FAN Rp -


MATERIAL " FIRST DUCT " ( PIR )
TD ducting panel density +/- 52 kg /m3 1.00 M2 Rp - Rp -
Invisible flange ( PVC ) 1.00 M2 Rp - Rp -
Tee connector flange ( PVC ) 1.00 M2 Rp - Rp -
Bayonet ( PVC ) 1.00 M2 Rp - Rp -
Covering angle ( PVC ) 1.00 Buah Rp - Rp -
TD Glue 0.20 Kg Rp - Rp -
Sealant neutral ( with colour ) 0.17 Botol Rp - Rp -
Chair saction bar Allumunium 1.00 M2 Rp - Rp -
"F" section bar Allumunium 1.00 M2 Rp - Rp -
Shaped disk Allumunium 1.00 Buah Rp - Rp -
Reinforcenent bar Allumunium 1.00 M2 Rp - Rp -
Ball joint damper ( Allumunium ) 0.50 Buah Rp - Rp -
Ball joint damper ( plastik ) 0.50 Buah Rp - Rp -
Jumlah h. bahan / 1 M2 Rp -
Penggantung 0.50 Buah Rp - Rp -
Upah Pasang & Bikin 0.20 Meter Rp - Rp -
Jumlah Rp -
Keuntungan 10% Rp -
Total = Jumlah+(Keuntungan 10%) Rp -

1 M' Pengadaan & Pemasangan Ducting supply dengan isolasi uk. 34 " x 18 " Rp 136,000
Ducting BJLS ukuran: ( 34 " x 18 " ) M2 2.600 Rp - Rp -
Upah pasang & bikin
Mandor hari 0.107 Rp 155,000.00 Rp 16,607
Kepala Tukang hari 0.357 Rp 155,000.00 Rp 55,357
Tukang hari 0.357 Rp 145,000.00 Rp 51,786
Jumlah Rp 123,750
Keuntungan 10% Rp 12,375
Pengadaan & Pemasangan Ducting supply dengan isolasi Rp 136,125

1 M' Pengadaan & Pemasangan Ducting supply dengan isolasi uk. 32 " x 18 " Rp 136,000
Ducting BJLS ukuran: ( 32 " x 18 " ) M2 2.500 Rp - Rp -
Analisa Harga Satuan Pekerjaan MEP - page 178 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Upah pasang & bikin
Mandor hari 0.107 Rp 155,000.00 Rp 16,607
Kepala Tukang hari 0.357 Rp 155,000.00 Rp 55,357
Tukang hari 0.357 Rp 145,000.00 Rp 51,786
Jumlah Rp 123,750
Keuntungan 10% Rp 12,375
Pengadaan & Pemasangan Ducting supply dengan isolasi Rp 136,125

1 M' Pengadaan & Pemasangan Ducting supply dengan isolasi uk. 28 " x 16 " Rp 136,000
Ducting BJLS ukuran: ( 28 " x 16 " ) M2 2.200 Rp - Rp -
Upah pasang & bikin
Mandor hari 0.107 Rp 155,000.00 Rp 16,607
Kepala Tukang hari 0.357 Rp 155,000.00 Rp 55,357
Tukang hari 0.357 Rp 145,000.00 Rp 51,786
Jumlah Rp 123,750
Keuntungan 10% Rp 12,375
Pengadaan & Pemasangan Ducting supply dengan isolasi Rp 136,125

1 M' Pengadaan & Pemasangan Ducting supply dengan isolasi uk. 28 " x 18 " Rp 136,000
Ducting BJLS ukuran: ( 28 " x 18 " ) M2 2.300 Rp - Rp -
Upah pasang & bikin
Mandor hari 0.107 Rp 155,000.00 Rp 16,607
Kepala Tukang hari 0.357 Rp 155,000.00 Rp 55,357
Tukang hari 0.357 Rp 145,000.00 Rp 51,786
Jumlah Rp 123,750
Keuntungan 10% Rp 12,375
Pengadaan & Pemasangan Ducting supply dengan isolasi Rp 136,125

1 M' Pengadaan & Pemasangan Ducting supply dengan isolasi uk. 26 " x 16 " Rp 136,000
Ducting BJLS ukuran: ( 26 " x 16 " ) M2 2.100 Rp - Rp -
Upah pasang & bikin
Mandor hari 0.107 Rp 155,000.00 Rp 16,607
Kepala Tukang hari 0.357 Rp 155,000.00 Rp 55,357
Tukang hari 0.357 Rp 145,000.00 Rp 51,786
Jumlah Rp 123,750
Keuntungan 10% Rp 12,375
Pengadaan & Pemasangan Ducting supply dengan isolasi Rp 136,125

1 M' Pengadaan & Pemasangan Ducting return dengan isolasi uk. 26 " x 14 " Rp 136,000
Ducting BJLS ukuran: ( 26 " x 14 " ) M2 2.000 Rp - Rp -
Upah pasang & bikin
Mandor hari 0.107 Rp 155,000.00 Rp 16,607
Kepala Tukang hari 0.357 Rp 155,000.00 Rp 55,357
Tukang hari 0.357 Rp 145,000.00 Rp 51,786
Jumlah Rp 123,750
Keuntungan 10% Rp 12,375
Pengadaan & Pemasangan Ducting supply dengan isolasi Rp 136,125

1 M' Pengadaan & Pemasangan Ducting supply dengan isolasi uk. 24 " x 16 " Rp 136,000
Ducting BJLS ukuran: ( 24 " x 16 " ) M2 2.000 Rp - Rp -
Upah pasang & bikin
Mandor hari 0.107 Rp 155,000.00 Rp 16,607
Kepala Tukang hari 0.357 Rp 155,000.00 Rp 55,357
Tukang hari 0.357 Rp 145,000.00 Rp 51,786
Jumlah Rp 123,750
Keuntungan 10% Rp 12,375
Pengadaan & Pemasangan Ducting supply dengan isolasi Rp 136,125

1 M' Pengadaan & Pemasangan Ducting supply dengan isolasi uk. 20 " x 14 " Rp 136,000
Ducting BJLS ukuran: ( 20 " x 14 " ) M2 1.700 Rp - Rp -
Upah pasang & bikin
Mandor hari 0.107 Rp 155,000.00 Rp 16,607
Kepala Tukang hari 0.357 Rp 155,000.00 Rp 55,357
Tukang hari 0.357 Rp 145,000.00 Rp 51,786
Jumlah Rp 123,750
Keuntungan 10% Rp 12,375
Pengadaan & Pemasangan Ducting supply dengan isolasi Rp 136,125

1 M' Pengadaan & Pemasangan Ducting supply dengan isolasi uk. 20 " x 16 " Rp 136,000
Ducting BJLS ukuran: ( 20 " x 16 " ) M2 1.800 Rp - Rp -
Upah pasang & bikin
Mandor hari 0.107 Rp 155,000.00 Rp 16,607
Kepala Tukang hari 0.357 Rp 155,000.00 Rp 55,357
Tukang hari 0.357 Rp 145,000.00 Rp 51,786
Jumlah Rp 123,750
Keuntungan 10% Rp 12,375
Pengadaan & Pemasangan Ducting supply dengan isolasi Rp 136,125

1 M' Pengadaan & Pemasangan Ducting supply dengan isolasi uk. 18 " x 16 " Rp 136,000
Ducting BJLS ukuran: ( 18 " x 16 " ) M2 1.700 Rp - Rp -
Upah pasang & bikin
Mandor hari 0.107 Rp 155,000.00 Rp 16,607
Kepala Tukang hari 0.357 Rp 155,000.00 Rp 55,357
Tukang hari 0.357 Rp 145,000.00 Rp 51,786
Jumlah Rp 123,750
Keuntungan 10% Rp 12,375
Pengadaan & Pemasangan Ducting supply dengan isolasi Rp 136,125

Analisa Harga Satuan Pekerjaan MEP - page 179 of 215


NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
1 M' Pengadaan & Pemasangan Ducting supply dengan isolasi uk. 16 " x 14 " Rp 136,000
Ducting BJLS ukuran: ( 16 " x 14 " ) M2 1.500 Rp - Rp -
Upah pasang & bikin
Mandor hari 0.107 Rp 155,000.00 Rp 16,607
Kepala Tukang hari 0.357 Rp 155,000.00 Rp 55,357
Tukang hari 0.357 Rp 145,000.00 Rp 51,786
Jumlah Rp 123,750
Keuntungan 10% Rp 12,375
Pengadaan & Pemasangan Ducting supply dengan isolasi Rp 136,125

1 M' Pengadaan & Pemasangan Ducting supply dengan isolasi uk. 14 " x 14 " Rp 136,000
Ducting BJLS ukuran: ( 14 " x 14 " ) M2 1.400 Rp - Rp -
Upah pasang & bikin
Mandor hari 0.107 Rp 155,000.00 Rp 16,607
Kepala Tukang hari 0.357 Rp 155,000.00 Rp 55,357
Tukang hari 0.357 Rp 145,000.00 Rp 51,786
Jumlah Rp 123,750
Keuntungan 10% Rp 12,375
Pengadaan & Pemasangan Ducting supply dengan isolasi Rp 136,125

1 M' Pengadaan & Pemasangan Ducting supply dengan isolasi uk. 12 " x 12 " Rp 136,000
Ducting BJLS ukuran: ( 12 " x 12 " ) M2 1.200 Rp - Rp -
Upah pasang & bikin
Mandor hari 0.107 Rp 155,000.00 Rp 16,607
Kepala Tukang hari 0.357 Rp 155,000.00 Rp 55,357
Tukang hari 0.357 Rp 145,000.00 Rp 51,786
Jumlah Rp 123,750
Keuntungan 10% Rp 12,375
Pengadaan & Pemasangan Ducting supply dengan isolasi Rp 136,125

1 M' Pengadaan & Pemasangan Ducting supply dengan isolasi uk. 10 " x 10 " Rp 136,000
Ducting BJLS ukuran: ( 10 " x 10 " ) M2 1.000 Rp - Rp -
Upah pasang & bikin
Mandor hari 0.107 Rp 155,000.00 Rp 16,607
Kepala Tukang hari 0.357 Rp 155,000.00 Rp 55,357
Tukang hari 0.357 Rp 145,000.00 Rp 51,786
Jumlah Rp 123,750
Keuntungan 10% Rp 12,375
Pengadaan & Pemasangan Ducting supply dengan isolasi Rp 136,125

1 M' Pengadaan & Pemasangan Ducting supply dengan isolasi uk. 10 " x 8 " Rp 136,000
Ducting BJLS ukuran: ( 10 " x 8 " ) M2 0.900 Rp - Rp -
Upah pasang & bikin
Mandor hari 0.107 Rp 155,000.00 Rp 16,607
Kepala Tukang hari 0.357 Rp 155,000.00 Rp 55,357
Tukang hari 0.357 Rp 145,000.00 Rp 51,786
Jumlah Rp 123,750
Keuntungan 10% Rp 12,375
Pengadaan & Pemasangan Ducting supply dengan isolasi Rp 136,125

1 M' Pengadaan & Pemasangan Ducting supply dengan isolasi uk. 18 " x 16 " Rp 106,000
Ducting BJLS ukuran: ( 18 " x 16 " ) M2 1.700 Rp - Rp -
Upah pasang & bikin
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 96,786
Keuntungan 10% Rp 9,679
Total = Jumlah+(Keuntungan 10%) Rp 106,464
1 M' Pengadaan & Pemasangan Ducting supply dengan isolasi uk. 18 " x 14 " Rp 106,000
Ducting BJLS ukuran: ( 18 " x 14 " ) M2 1.600 Rp - Rp -
Upah pasang & bikin
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 96,786
Keuntungan 10% Rp 9,679
Total = Jumlah+(Keuntungan 10%) Rp 106,464
1 M' Pengadaan & Pemasangan Ducting supply dengan isolasi uk. 16 " x 14 " Rp 106,000
Ducting BJLS ukuran: ( 16 " x 14 " ) M2 1.500 Rp - Rp -
Upah pasang & bikin
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 96,786
Keuntungan 10% Rp 9,679
Total = Jumlah+(Keuntungan 10%) Rp 106,464
1 M' Pengadaan & Pemasangan Ducting supply dengan isolasi uk. 16 " x 12 " Rp 106,000
Ducting BJLS ukuran: ( 16 " x 12 " ) M2 1.400 Rp - Rp -
Upah pasang & bikin
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 96,786
Keuntungan 10% Rp 9,679
Total = Jumlah+(Keuntungan 10%) Rp 106,464
1 M' Pengadaan & Pemasangan Ducting supply dengan isolasi uk. 14 " x 12 " Rp 106,000
Analisa Harga Satuan Pekerjaan MEP - page 180 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Ducting BJLS ukuran: ( 14 " x 12 " ) M2 1.300 Rp - Rp -
Upah pasang & bikin
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 96,786
Keuntungan 10% Rp 9,679
Total = Jumlah+(Keuntungan 10%) Rp 106,464

1 M' Pengadaan & Pemasangan Ducting supply dengan isolasi uk. 14 " x 10 " Rp 106,000
Ducting BJLS ukuran: ( 14 " x 10 " ) M2 1.200 Rp - Rp -
Upah pasang & bikin
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 96,786
Keuntungan 10% Rp 9,679
Total = Jumlah+(Keuntungan 10%) Rp 106,464
1 M' Pengadaan & Pemasangan Ducting supply dengan isolasi uk. 12 " x 10 " Rp 106,000
Ducting BJLS ukuran: ( 12 " x 10 " ) M2 1.100 Rp - Rp -
Upah pasang & bikin
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 96,786
Keuntungan 10% Rp 9,679
Total = Jumlah+(Keuntungan 10%) Rp 106,464

1 M' Pengadaan & Pemasangan Ducting supply dengan isolasi uk. 8 " x 8 " Rp 106,000
Ducting BJLS ukuran: ( 8 " x 8 " ) M2 0.800 Rp - Rp -
Upah pasang & bikin
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 96,786
Keuntungan 10% Rp 9,679
Total = Jumlah+(Keuntungan 10%) Rp 106,464
1 M' Pengadaan & Pemasangan Ducting supply dengan isolasi uk. 8 " x 6 " Rp 106,000
Ducting BJLS ukuran: ( 8 " x 6 " ) M2 0.700 Rp - Rp -
Upah pasang & bikin
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 96,786
Keuntungan 10% Rp 9,679
Total = Jumlah+(Keuntungan 10%) Rp 106,464
1 M' Pengadaan & Pemasangan Ducting supply dengan isolasi uk. 6 " x 6 " Rp 106,000
Ducting BJLS ukuran: ( 6 " x 6 " ) M2 0.600 Rp - Rp -
Upah pasang & bikin
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 96,786
Keuntungan 10% Rp 9,679
Total = Jumlah+(Keuntungan 10%) Rp 106,464
1 M' Pengadaan & Pemasangan Ducting Fresh Air tanpa isolasi uk. 10 " x 8 " Rp 106,000
Ducting BJLS ukuran: ( 10 " x 6 " ) M2 0.900 Rp - Rp -
Upah pasang & bikin
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 96,786
Keuntungan 10% Rp 9,679
Total = Jumlah+(Keuntungan 10%) Rp 106,464

1 M' Pengadaan & Pemasangan Ducting Fresh Air tanpa isolasi uk. 20 " x 14 " Rp 106,000
Ducting BJLS ukuran: ( 20 " x 14 " ) M2 1.700 Rp - Rp -
Upah pasang & bikin
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 96,786
Keuntungan 10% Rp 9,679
Total = Jumlah+(Keuntungan 10%) Rp 106,464

1 M' Pengadaan & Pemasangan Ducting Fresh Air tanpa isolasi uk. 18 " x 14 " Rp 106,000
Ducting BJLS ukuran: ( 18 " x 14 " ) M2 1.600 Rp - Rp -
Upah pasang & bikin
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 96,786
Keuntungan 10% Rp 9,679
Total = Jumlah+(Keuntungan 10%) Rp 106,464

1 M' Pengadaan & Pemasangan Ducting Fresh Air tanpa isolasi uk. 18 " x 12 " Rp 106,000
Ducting BJLS ukuran: ( 18 " x 12 " ) M2 1.500 Rp - Rp -
Analisa Harga Satuan Pekerjaan MEP - page 181 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Upah pasang & bikin
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 96,786
Keuntungan 10% Rp 9,679
Total = Jumlah+(Keuntungan 10%) Rp 106,464

1 M' Pengadaan & Pemasangan Ducting Fresh Air tanpa isolasi uk. 16 " x 12 " Rp 106,000
Ducting BJLS ukuran: ( 16 " x 12 " ) M2 1.400 Rp - Rp -
Upah pasang & bikin
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 96,786
Keuntungan 10% Rp 9,679
Total = Jumlah+(Keuntungan 10%) Rp 106,464

1 M' Pengadaan & Pemasangan Ducting Fresh Air tanpa isolasi uk. 14 " x 12 " Rp 106,000
Ducting BJLS ukuran: ( 14 " x 12 " ) M2 1.300 Rp - Rp -
Upah pasang & bikin
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 96,786
Keuntungan 10% Rp 9,679
Total = Jumlah+(Keuntungan 10%) Rp 106,464

1 M' Pengadaan & Pemasangan Ducting Fresh Air tanpa isolasi uk. 12 " x 10 " Rp 106,000
Ducting BJLS ukuran: ( 10 " x 10 " ) M2 1.100 Rp - Rp -
Upah pasang & bikin
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 96,786
Keuntungan 10% Rp 9,679
Total = Jumlah+(Keuntungan 10%) Rp 106,464

1 M' Pengadaan & Pemasangan Ducting Fresh Air tanpa isolasi uk. 12 " x 8 " Rp 106,000
Ducting BJLS ukuran: ( 12 " x 8 " ) M2 1.000 Rp - Rp -
Upah pasang & bikin
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 96,786
Keuntungan 10% Rp 9,679
Total = Jumlah+(Keuntungan 10%) Rp 106,464

1 M' Pengadaan & Pemasangan Ducting Fresh Air tanpa isolasi uk. 10 " x 10 " Rp 106,000
Ducting BJLS ukuran: ( 10 " x 10 " ) M2 1.000 Rp - Rp -
Upah pasang & bikin
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 96,786
Keuntungan 10% Rp 9,679
Total = Jumlah+(Keuntungan 10%) Rp 106,464

1 M' Pengadaan & Pemasangan Ducting Exhaust tanpa isolasi uk. 8 " x 8 " Rp 106,000
Ducting BJLS ukuran: ( 8 " x 8 " ) M2 0.800 Rp - Rp -
Upah pasang & bikin
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 96,786
Keuntungan 10% Rp 9,679
Total = Jumlah+(Keuntungan 10%) Rp 106,464

1 M' Pengadaan & Pemasangan Ducting Exhaust tanpa isolasi uk. 8 " x 6 " Rp 106,000
Ducting BJLS ukuran: ( 8 " x 6 " ) M2 0.700 Rp - Rp -
Upah pasang & bikin
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 96,786
Keuntungan 10% Rp 9,679
Total = Jumlah+(Keuntungan 10%) Rp 106,464

1 M' Pengadaan & Pemasangan Ducting Exhaust tanpa isolasi uk. 6 " x 6 " Rp 106,000
Ducting BJLS ukuran: ( 6 " x 6 " ) M2 0.600 Rp - Rp -
Upah pasang & bikin
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 96,786
Keuntungan 10% Rp 9,679
Total = Jumlah+(Keuntungan 10%) Rp 106,464
Analisa Harga Satuan Pekerjaan MEP - page 182 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL

1 M' Pengadaan & Pemasangan Ducting Exhaust tanpa isolasi uk. 14" x 10 " Rp 106,000
Ducting BJLS ukuran: ( 14 " x 10 " ) M2 1.200 Rp - Rp -
Upah pasang & bikin
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 96,786
Keuntungan 10% Rp 9,679
Total = Jumlah+(Keuntungan 10%) Rp 106,464

1 BH Supply Air Diffuser c/w OBD (Finishing Cat Powder Coating) 14 " x 14 " Rp 59,000
Supply Air Diffuser c/w OBD (Finishing Cat Powder Coating) 14 " x 14 " bh 1.000 Rp - Rp -
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.143 Rp 155,000.00 Rp 22,143
Tukang hari 0.143 Rp 145,000.00 Rp 20,714
Jumlah Rp 53,929
Keuntungan 10% Rp 5,393
Total = Jumlah+(Keuntungan 10%) Rp 59,321

1 BH Supply Air Diffuser c/w OBD (Finishing Cat Powder Coating) 12 " x 12 " Rp 59,000
Supply Air Diffuser c/w OBD (Finishing Cat Powder Coating) 12 " x 12 " bh 1.000 Rp - Rp -
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.143 Rp 155,000.00 Rp 22,143
Tukang hari 0.143 Rp 145,000.00 Rp 20,714
Jumlah Rp 53,929
Keuntungan 10% Rp 5,393
Total = Jumlah+(Keuntungan 10%) Rp 59,321

1 BH Supply Air Diffuser c/w OBD (Finishing Cat Powder Coating) 20" x 8 " Rp 59,000
Supply Air Diffuser c/w OBD (Finishing Cat Powder Coating) 20 " x 8 " bh 1.000 Rp - Rp -
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.143 Rp 155,000.00 Rp 22,143
Tukang hari 0.143 Rp 145,000.00 Rp 20,714
Jumlah Rp 53,929
Keuntungan 10% Rp 5,393
Total = Jumlah+(Keuntungan 10%) Rp 59,321

1 BH Supply Air Diffuser c/w OBD (Finishing Cat Powder Coating) 8" x 8 " Rp 59,000
Supply Air Diffuser c/w OBD (Finishing Cat Powder Coating) 8 " x 8 " bh 1.000 Rp - Rp -
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.143 Rp 155,000.00 Rp 22,143
Tukang hari 0.143 Rp 145,000.00 Rp 20,714
Jumlah Rp 53,929
Keuntungan 10% Rp 5,393
Total = Jumlah+(Keuntungan 10%) Rp 59,321

1 BH Supply Air Diffuser c/w OBD (Finishing Cat Powder Coating) 10" x 10 " Rp 59,000
Supply Air Diffuser c/w OBD (Finishing Cat Powder Coating) 10 " x 10 " bh 1.000 Rp - Rp -
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.143 Rp 155,000.00 Rp 22,143
Tukang hari 0.143 Rp 145,000.00 Rp 20,714
Jumlah Rp 53,929
Keuntungan 10% Rp 5,393
Total = Jumlah+(Keuntungan 10%) Rp 59,321

1 BH Return Air Grille c/w OBD (Finishing Cat Powder Coating) 16 " x 10 " Rp 59,000
Return Air Grille c/w OBD (Finishing Cat Powder Coating) 16 " x 10 " bh 1.000 Rp - Rp -
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.143 Rp 155,000.00 Rp 22,143
Tukang hari 0.143 Rp 145,000.00 Rp 20,714
Jumlah Rp 53,929
Keuntungan 10% Rp 5,393
Total = Jumlah+(Keuntungan 10%) Rp 59,321
1 BH Return Air Grille c/w OBD (Finishing Cat Powder Coating) 14 " x 8 " Rp 59,000
Return Air Grille c/w OBD (Finishing Cat Powder Coating) 14 " x 8 " bh 1.000 Rp - Rp -
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.143 Rp 155,000.00 Rp 22,143
Tukang hari 0.143 Rp 145,000.00 Rp 20,714
Jumlah Rp 53,929
Keuntungan 10% Rp 5,393
Total = Jumlah+(Keuntungan 10%) Rp 59,321

1 BH Return Air Grille c/w OBD (Finishing Cat Powder Coating) 24 " x12 " Rp 59,000
Return Air Grille c/w OBD (Finishing Cat Powder Coating) 24 " x12 " bh 1.000 Rp - Rp -
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.143 Rp 155,000.00 Rp 22,143
Tukang hari 0.143 Rp 145,000.00 Rp 20,714
Jumlah Rp 53,929
Keuntungan 10% Rp 5,393
Total = Jumlah+(Keuntungan 10%) Rp 59,321

1 BH Return Air Grille c/w OBD (Finishing Cat Powder Coating) 24 " x8 " Rp 59,000
Return Air Grille c/w OBD (Finishing Cat Powder Coating) 24 " x8 " bh 1.000 Rp - Rp -
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.143 Rp 155,000.00 Rp 22,143
Tukang hari 0.143 Rp 145,000.00 Rp 20,714
Jumlah Rp 53,929
Analisa Harga Satuan Pekerjaan MEP - page 183 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Keuntungan 10% Rp 5,393
Total = Jumlah+(Keuntungan 10%) Rp 59,321

1 BH Return Air Grille c/w OBD (Finishing Cat Powder Coating) 16 " x8 " Rp 59,000
Return Air Grille c/w OBD (Finishing Cat Powder Coating) 16 " x8 " bh 1.000 Rp - Rp -
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.143 Rp 155,000.00 Rp 22,143
Tukang hari 0.143 Rp 145,000.00 Rp 20,714
Jumlah Rp 53,929
Keuntungan 10% Rp 5,393
Total = Jumlah+(Keuntungan 10%) Rp 59,321

1 BH Return Air Grille c/w OBD (Finishing Cat Powder Coating) 18 " x10 " Rp 59,000
Return Air Grille c/w OBD (Finishing Cat Powder Coating) 18 " x10 " bh 1.000 Rp - Rp -
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.143 Rp 155,000.00 Rp 22,143
Tukang hari 0.143 Rp 145,000.00 Rp 20,714
Jumlah Rp 53,929
Keuntungan 10% Rp 5,393
Total = Jumlah+(Keuntungan 10%) Rp 59,321

1 BH Fresh Air Grille (Finishing Cat Powder Coating) 18 " x 14 " Rp 59,000
Fresh Air Grille (Finishing Cat Powder Coating) 18 " x 14 " bh 1.000 Rp - Rp -
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.143 Rp 155,000.00 Rp 22,143
Tukang hari 0.143 Rp 145,000.00 Rp 20,714
Jumlah Rp 53,929
Keuntungan 10% Rp 5,393
Total = Jumlah+(Keuntungan 10%) Rp 59,321

1 BH Fresh Air Grille (Finishing Cat Powder Coating) 14 " x 12 " Rp 59,000
Fresh Air Grille (Finishing Cat Powder Coating) 14 " x 12 " bh 1.000 Rp - Rp -
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.143 Rp 155,000.00 Rp 22,143
Tukang hari 0.143 Rp 145,000.00 Rp 20,714
Jumlah Rp 53,929
Keuntungan 10% Rp 5,393
Total = Jumlah+(Keuntungan 10%) Rp 59,321
1 BH Fresh Air Grille (Finishing Cat Powder Coating) 14 " x 8 " Rp 59,000
Fresh Air Grille (Finishing Cat Powder Coating) 14 " x 8 " bh 1.000 Rp - Rp -
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.143 Rp 155,000.00 Rp 22,143
Tukang hari 0.143 Rp 145,000.00 Rp 20,714
Jumlah Rp 53,929
Keuntungan 10% Rp 5,393
Total = Jumlah+(Keuntungan 10%) Rp 59,321
1 BH Fresh Air Grille (Finishing Cat Powder Coating) 14 " x 14 " Rp 59,000
Fresh Air Grille (Finishing Cat Powder Coating) 14 " x 14 " bh 1.000 Rp - Rp -
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.143 Rp 155,000.00 Rp 22,143
Tukang hari 0.143 Rp 145,000.00 Rp 20,714
Jumlah Rp 53,929
Keuntungan 10% Rp 5,393
Total = Jumlah+(Keuntungan 10%) Rp 59,321

1 BH Fresh Air Louvre (Finishing Cat Powder Coating) 12 " x 10 " Rp 601,000
Fresh Air Louvre (Finishing Cat Powder Coating) 12 " x 10 " bh 1.000 Rp 450,000.00 Rp 450,000
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 546,786
Keuntungan 10% Rp 54,679
Total = Jumlah+(Keuntungan 10%) Rp 601,464

1 BH Fresh Air Louvre (Finishing Cat Powder Coating) 16 " x 12 " Rp 601,000
Fresh Air Louvre (Finishing Cat Powder Coating) 16 " x 12 " bh 1.000 Rp 450,000.00 Rp 450,000
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 546,786
Keuntungan 10% Rp 54,679
Total = Jumlah+(Keuntungan 10%) Rp 601,464

1 BH Supply Air Grille c/w OBD (Finishing Cat Powder Coating) 22 " x 12 " Rp 106,000
Supply Air Grille c/w OBD (Finishing Cat Powder Coating) 22 " x 12 " bh 1.000 Rp - Rp -
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 96,786
Keuntungan 10% Rp 9,679
Total = Jumlah+(Keuntungan 10%) Rp 106,464
1 BH Exhaust Air Grille (Finishing Cat Powder Coating) 24 " x 12 " Rp 106,000
Exhaust Air Grille (Finishing Cat Powder Coating) 24 " x 12 " bh 1.000 Rp - Rp -
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 96,786
Keuntungan 10% Rp 9,679
Analisa Harga Satuan Pekerjaan MEP - page 184 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Total = Jumlah+(Keuntungan 10%) Rp 106,464

1 BH Exhaust Air Grille (Finishing Cat Powder Coating) 400 cfm ( 14" x 14 " ) Rp 106,000
Exhaust Air Grille (Finishing Cat Powder Coating) 400 cfm ( 14" x 14 " ) bh 1.000 Rp - Rp -
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 96,786
Keuntungan 10% Rp 9,679
Total = Jumlah+(Keuntungan 10%) Rp 106,464
1 BH Exhaust Air Grille (Finishing Cat Powder Coating) 393 cfm ( 14" x 14 " ) Rp 106,000
Exhaust Air Grille (Finishing Cat Powder Coating) 393 cfm ( 14" x 14 " ) bh 1.000 Rp - Rp -
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 96,786
Keuntungan 10% Rp 9,679
Total = Jumlah+(Keuntungan 10%) Rp 106,464
1 BH Exhaust Air Grille (Finishing Cat Powder Coating) 350 cfm ( 12" x 12 " ) Rp 97,000
Exhaust Air Grille (Finishing Cat Powder Coating) 350 cfm ( 12" x 12 " ) bh 1.000 Rp - Rp -
Mandor hari 0.071 Rp - Rp -
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Jumlah Rp 88,571
Keuntungan 10% Rp 8,857
Total = Jumlah+(Keuntungan 10%) Rp 97,429

1 BH Exhaust Air Grille (Finishing Cat Powder Coating) 300 cfm ( 12" x 12 " ) Rp 106,000
Exhaust Air Grille (Finishing Cat Powder Coating) 300 cfm ( 12" x 12 " ) bh 1.000 Rp - Rp -
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 96,786
Keuntungan 10% Rp 9,679
Total = Jumlah+(Keuntungan 10%) Rp 106,464
1 BH Exhaust Air Grille (Finishing Cat Powder Coating) 250 cfm ( 11" x 11 " ) Rp 106,000
Exhaust Air Grille (Finishing Cat Powder Coating) 250 cfm ( 11" x 11 " ) bh 1.000 Rp - Rp -
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 96,786
Keuntungan 10% Rp 9,679
Total = Jumlah+(Keuntungan 10%) Rp 106,464
1 BH Exhaust Air Grille (Finishing Cat Powder Coating) 200 cfm ( 10" x 10 " ) Rp 106,000
Exhaust Air Grille (Finishing Cat Powder Coating) 200 cfm ( 10" x 10 " ) bh 1.000 Rp - Rp -
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 96,786
Keuntungan 10% Rp 9,679
Total = Jumlah+(Keuntungan 10%) Rp 106,464
1 BH Exhaust Air Grille (Finishing Cat Powder Coating) 100 cfm ( 8" x 8 " ) Rp 106,000
Exhaust Air Grille (Finishing Cat Powder Coating) 100 cfm ( 8" x 8 " ) bh 1.000 Rp - Rp -
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 96,786
Keuntungan 10% Rp 9,679
Total = Jumlah+(Keuntungan 10%) Rp 106,464
1 BH Fresh Air Grille (Finishing Cat Powder Coating) 200 cfm ( 10" x 10 " ) Rp 106,000
Fresh Air Grille (Finishing Cat Powder Coating) 200 cfm ( 10" x 10 " ) bh 1.000 Rp - Rp -
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 96,786
Keuntungan 10% Rp 9,679
Total = Jumlah+(Keuntungan 10%) Rp 106,464
1 BH Fresh Air Grille (Finishing Cat Powder Coating) 150 cfm ( 6" x 6 " ) Rp 106,000
Fresh Air Grille (Finishing Cat Powder Coating) 150 cfm ( 6" x 6 " ) bh 1.000 Rp - Rp -
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 96,786
Keuntungan 10% Rp 9,679
Total = Jumlah+(Keuntungan 10%) Rp 106,464
1 BH Exhaust Air Grille (Finishing Cat Powder Coating) 100 cfm ( 8" x 8 " ) Rp 106,000
Exhaust Air Grille (Finishing Cat Powder Coating) 100 cfm ( 8" x 8 " ) bh 1.000 Rp - Rp -
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 96,786
Keuntungan 10% Rp 9,679
Total = Jumlah+(Keuntungan 10%) Rp 106,464
1 BH Exhaust Air Grille (Finishing Cat Powder Coating) 50 cfm ( 6" x 6 " ) Rp 106,000
Exhaust Air Grille (Finishing Cat Powder Coating) 50 cfm ( 6" x 6 " ) bh 1.000 Rp - Rp -
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Analisa Harga Satuan Pekerjaan MEP - page 185 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Jumlah Rp 96,786
Keuntungan 10% Rp 9,679
Total = Jumlah+(Keuntungan 10%) Rp 106,464
1 BH Fresh Air Greille (Finishing Cat Powder Coating) 990 cfm ( 20" x 20 " ) Rp 546,000
Fresh Air Greille (Finishing Cat Powder Coating) 990 cfm ( 20" x 20 " ) bh 1.000 Rp 400,000.00 Rp 400,000
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 496,786
Keuntungan 10% Rp 49,679
Total = Jumlah+(Keuntungan 10%) Rp 546,464
1 BH Fresh Air Greille (Finishing Cat Powder Coating) 710 cfm (16" x 16 " ) Rp 106,464
Fresh Air Greille (Finishing Cat Powder Coating) 710 cfm (16" x 16 " ) bh 1.000 Rp - Rp -
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 96,786
Keuntungan 10% Rp 9,679
Total = Jumlah+(Keuntungan 10%) Rp 106,464

1 BH Fresh Air Greille (Finishing Cat Powder Coating) 770 cfm (16" x 16 " ) Rp 106,464
Fresh Air Greille (Finishing Cat Powder Coating) 770 cfm (16" x 16 " ) bh 1.000 Rp - Rp -
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 96,786
Keuntungan 10% Rp 9,679
Total = Jumlah+(Keuntungan
Rp 10%) 106,464
1 BH Fresh Air Greille (Finishing Cat Powder Coating) 300 cfm (12" x 12 " ) Rp 106,464
Fresh Air Greille (Finishing Cat Powder Coating) 300 cfm (12" x 12 " ) bh 1.000 Rp - Rp -
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 96,786
Keuntungan 10% Rp 9,679
Total = Jumlah+(Keuntungan
Rp 10%) 106,464
1 BH Return Air Grille e (Finishing Cat Powder Coating) 630 cfm (16" x 16 " ) Rp 106,464
Return Air Grille e (Finishing Cat Powder Coating) 630 cfm (16" x 16 " ) bh 1.000 Rp - Rp -
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 96,786
Keuntungan 10% Rp 9,679
Total = Jumlah+(Keuntungan
Rp 10%) 106,464
1 BH Louvre Grille 20 " x 12 " Rp 601,464
Louvre Grille 20 " x 12 " bh 1.000 Rp 450,000.00 Rp 450,000
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 546,786
Keuntungan 10% Rp 54,679
Total = Jumlah+(Keuntungan
Rp 10%) 601,464
1 BH Hood Rp 106,464
Hood bh 1.000 Rp -
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 96,786
Keuntungan 10% Rp 9,679
Total = Jumlah+(Keuntungan
Rp 10%) 106,464

PEKERJAAN PENANGKAL PETIR


1 BH Air Terminal Petir * Electrostatis ) R = 100 meter Rp 19,677,429
Air Terminal Petir * Electrostatis ) R = 100 meter bh 1.000 Rp 17,500,000.00Rp 17,500,000
Mandor hari 0.571 Rp 155,000.00Rp 88,571
Kepala Tukang hari 1.000 Rp 155,000.00Rp 155,000
Tukang hari 1.000 Rp 145,000.00Rp 145,000
Jumlah Rp 17,888,571
Keuntungan 10% Rp 1,788,857
Total = Jumlah+(Keuntungan
Rp 10%)19,677,429
1 BH Kabel Hantaran NYA 1 x 70 mm2 Rp 354,161
Kabel Hantaran NYA 1 x 70 mm2 m' 1.000 Rp 295,000.00 Rp 295,000
Mandor hari 0.036 Rp 155,000.00 Rp 5,536
Kepala Tukang hari 0.071 Rp 155,000.00 Rp 11,071
Tukang hari 0.071 Rp 145,000.00 Rp 10,357
Jumlah Rp 321,964
Keuntungan 10% Rp 32,196
Total = Jumlah+(Keuntungan
Rp 10%) 354,161
1 set Connecting Sleeve lengkap surge arester Rp 6,570,143
Connecting Sleeve lengkap surge arester m' 1.000 Rp 5,800,000.00Rp 5,800,000
Mandor hari 0.286 Rp 155,000.00Rp 44,286
Kepala Tukang hari 0.429 Rp 155,000.00Rp 66,429
Tukang hari 0.429 Rp 145,000.00Rp 62,143
Jumlah Rp 5,972,857
Keuntungan 10% Rp 597,286
Total = Jumlah+(Keuntungan
Rp 10%) 6,570,143
1 set Lightening Flash counter Rp 11,740,143
Lightening Flash counter m' 1.000 Rp 10,500,000.00 Rp 10,500,000
Analisa Harga Satuan Pekerjaan MEP - page 186 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Mandor hari 0.286 Rp 155,000.00 Rp 44,286
Kepala Tukang hari 0.429 Rp 155,000.00 Rp 66,429
Tukang hari 0.429 Rp 145,000.00 Rp 62,143
Jumlah Rp 10,672,857
Keuntungan 10% Rp 1,067,286
Total = Jumlah+(Keuntungan
Rp 10%)11,740,143
1 ttk Grounding sistem Rp 5,542,429
Grounding sistem m' 1.000 Rp 4,500,000.00 Rp 4,500,000
- Copper road
- Pentanahan & pipa GIP dia. 1 1/2 "
- Bak kontrol ( 40x40) cm lengkap tutup
- Kawat BCC dia. 70 mm
Mandor hari 0.571 Rp 155,000.00Rp 88,571
Kepala Tukang hari 1.500 Rp 155,000.00Rp 232,500
Tukang hari 1.500 Rp 145,000.00Rp 217,500
Jumlah Rp 5,038,571
Keuntungan 10% Rp 503,857
Total = Jumlah+(Keuntungan
Rp 10%) 5,542,429
1 unit Tiang / Menara - dududkan EF Rp 3,342,429
Tiang / Menara - dududkan EF m' 1.000 Rp 2,500,000.00
Rp 2,500,000
Mandor hari 0.571 Rp 155,000.00
Rp 88,571
Kepala Tukang hari 1.500 Rp 155,000.00
Rp 232,500
Tukang hari 1.500 Rp 145,000.00
Rp 217,500
Jumlah Rp 3,038,571
Keuntungan 10% Rp 303,857
Total = Jumlah+(Keuntungan
Rp 10%) 3,342,429
1 unit Obstrution Lamp + istalasi Rp 3,930,929
Obstrution Lamp + istalasi m' 1.000 Rp 3,250,000.00
Rp 3,250,000
Mandor hari 0.429 Rp 155,000.00
Rp 66,429
Kepala Tukang hari 0.857 Rp 155,000.00
Rp 132,857
Tukang hari 0.857 Rp 145,000.00
Rp 124,286
Jumlah Rp 3,573,571
Keuntungan 10% Rp 357,357
Total = Jumlah+(Keuntungan
Rp 10%) 3,930,929

PEKERJAAN ELEKTRIKAL
1 set PENGADAAN & PEMASANGAN PANEL TEGANGAN MENENGAH ( PTM ) Rp 831,000
Pondasi Dan Dudukan Panel bh 1.000 Rp -
Accessories
Incoming MV Cubicle 20 Kv LBS 400A unit 1.000 Rp -
Outgoing MV Cubicle 20 Kv LBS 400A unit 1.000 Rp -
Cubicle Arester unit 1.000 Rp -
Alat Bantu Lainnya unit 1.000 Rp -
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 755,000
Keuntungan 10% Rp 75,500
Total = Jumlah+(Keuntungan 10%) Rp 830,500
1 unit PENGADAAN & PEMASANGAN TRAFO KAP, 1000 KVA Rp 122,381,000
Trafo Kering, Kapasitas : 1000 kVA bh 1.000 Rp 110,500,000.00 Rp 110,500,000
Terminasi bh 1.000 Rp -
Alat Bantu Lainnya unit 1.000 Rp -
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 111,255,000
Keuntungan 10% Rp 11,125,500
Total = Jumlah+(Keuntungan 10%) Rp 122,380,500
1 UNIT PEMASANGAN HARMONIC FILTER Rp 32,817,000
Capasitor Regulator, 25 kVAR (12 step) bh 1.000 Rp - Rp -
MCCB 400-630 A/3 Phasa bh 1.000 Rp 6,570,000.00 Rp 6,570,000
Harmonic Filter Reactor 50kVAR bh 4.000 Rp - Rp -
Premium Capasitor 40kVAR/3p/400V/50Hz/In = 1,7 bh 4.000 Rp - Rp -
Busbar Tembaga SolidStandard NEMA (300x100x10) bh 1.000 Rp - Rp -
Interlock bh 1.000 Rp 7,500,000.00 Rp 7,500,000
Volt Meter 0-500V EC 96 bh 6.000 Rp 350,000.00 Rp 2,100,000
Ampere Meter 800/5A EC 96 bh 6.000 Rp 300,000.00 Rp 1,800,000
Selector Switch M-O-A 2P bh 2.000 Rp 120,000.00 Rp 240,000
Shun trip bh 1.000 Rp 800,000.00 Rp 800,000
Box Panel ( 120 x 100 x 30 ) cm Unit 1.000 Rp 7,500,000.00 Rp 7,500,000
Grounding A Ls 1.000 Rp 1,243,200.00 Rp 1,243,200
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 1,325,500.00 Rp 1,325,500
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 29,833,700
Keuntungan 10% Rp 2,983,370
Total = Jumlah+(Keuntungan 10%) Rp 32,817,070

1 UNIT Pengadaan & Pemasangan PANEL PKG, AMF, ATS Rp 94,966,850


ACB 1600 A bh 2.000 Rp 16,500,000.00 Rp 33,000,000
ATS / Solenoid 1600A bh 1.000 Rp - Rp -
Digital Meter bh 2.000 Rp 6,900,000.00 Rp 13,800,000
CT 2500/5 bh 6.000 Rp 1,350,000.00 Rp 8,100,000
Arresster bh 1.000 Rp 450,000.00 Rp 450,000
Box Panel ( 120 x 100 x 30 ) cm Unit 2.000 Rp 7,500,000.00 Rp 15,000,000
Analisa Harga Satuan Pekerjaan MEP - page 187 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 7,035,000.00 Rp 7,035,000
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 7,738,500.00 Rp 7,738,500
Mandor hari 2.000 Rp 155,000.00 Rp 310,000
Kepala Tukang hari 3.000 Rp 155,000.00 Rp 465,000
Tukang hari 3.000 Rp 145,000.00 Rp 435,000
Jumlah Rp 86,333,500
Keuntungan 10% Rp 8,633,350
Total = Jumlah+(Keuntungan 10%) Rp 94,966,850
1 UNIT Pengadaan & Pemasangan PANEL PUTR Rp 89,760,825
MCCB 400-1000 A/3 Phasa bh 1.000 Rp 7,500,000.00 Rp 7,500,000
MCCB 350-500 A/3 Phasa bh 1.000 Rp 5,600,000.00 Rp 5,600,000
MCCB 300-400 A/3 Phasa bh 1.000 Rp 2,130,000.00 Rp 2,130,000
MCCB 250-350 A/3 Phasa bh 2.000 Rp 2,130,000.00 Rp 4,260,000
MCCB 80-100 A/3 Phasa bh 2.000 Rp 750,000.00 Rp 1,500,000
MCCB 63-80 A/3 Phasa bh 2.000 Rp 360,000.00 Rp 720,000
MCB 50 A/3 Phasa bh 2.000 Rp 395,000.00 Rp 790,000
MCB 20 A/3 Phasa bh 2.000 Rp 175,000.00 Rp 350,000
MCCB 32 A/3 Phasa bh 2.000 Rp 325,000.00 Rp 650,000
Mechanic Motor Interlock bh 1.000 Rp 7,500,000.00 Rp 7,500,000
Digital Meter bh 1.000 Rp 6,900,000.00 Rp 6,900,000
CT 2500/5 bh 2.000 Rp 1,350,000.00 Rp 2,700,000
Arresster bh 1.000 Rp 450,000.00 Rp 450,000
Box Panel ( 120 x 100 x 30 ) cm Unit 3.000 Rp 7,500,000.00 Rp 22,500,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 9,532,500.00 Rp 9,532,500
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 7,308,250.00 Rp 7,308,250
Mandor hari 2.000 Rp 155,000.00 Rp 310,000
Kepala Tukang hari 3.000 Rp 155,000.00 Rp 465,000
Tukang hari 3.000 Rp 145,000.00 Rp 435,000
Jumlah Rp 81,600,750
Keuntungan 10% Rp 8,160,075
Total = Jumlah+(Keuntungan 10%) Rp 89,760,825

1 UNIT Pengadaan & Pemasangan PANEL MDP - A Rp 28,703,950


MCCB 140-200 A/3 Phasa bh 1.000 Rp 2,070,000.00 Rp 2,070,000
MCCB 100-125 A/3 Phasa bh 1.000 Rp 1,970,000.00 Rp 1,970,000
MCCB 80-100 A/3 Phasa bh 3.000 Rp 750,000.00 Rp 2,250,000
MCCB 50 A/3 Phasa bh 2.000 Rp 365,000.00 Rp 730,000
Digital Meter bh 1.000 Rp 6,900,000.00 Rp 6,900,000
Box Panel ( 80 x 60 x 30 ) cm Unit 1.000 Rp 4,850,000.00 Rp 4,850,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 2,815,500.00 Rp 2,815,500
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 3,754,000.00 Rp 3,754,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 26,094,500
Keuntungan 10% Rp 2,609,450
Total = Jumlah+(Keuntungan 10%) Rp 28,703,950

1 UNIT Pengadaan & Pemasangan PANEL SDP - GF.A Rp 19,348,450


MCCB 50 A/3 Phasa bh 2.000 Rp 365,000.00 Rp 730,000
MCCB 40 A/3 Phasa bh 1.000 Rp 365,000.00 Rp 365,000
MCB 20 A/3 Phasa bh 2.000 Rp 175,000.00 Rp 350,000
MCB 16 A/3 Phasa bh 1.000 Rp 175,000.00 Rp 175,000
Digital Meter bh 1.000 Rp 6,900,000.00 Rp 6,900,000
Box Panel ( 60 x 60 x 20 ) cm Unit 1.000 Rp 3,950,000.00 Rp 3,950,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 1,870,500.00 Rp 1,870,500
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 2,494,000.00 Rp 2,494,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 17,589,500
Keuntungan 10% Rp 1,758,950
Total = Jumlah+(Keuntungan 10%) Rp 19,348,450

1 UNIT Pengadaan & Pemasangan PANEL SDP - 1A Rp 19,393,000


MCCB 50 A/3 Phasa bh 2.000 Rp 365,000.00 Rp 730,000
MCCB 40 A/3 Phasa bh 1.000 Rp 365,000.00 Rp 365,000
MCB 25 A/3 Phasa bh 2.000 Rp 190,000.00 Rp 380,000
MCB 20 A/3 Phasa bh 1.000 Rp 175,000.00 Rp 175,000
Digital Meter bh 1.000 Rp 6,900,000.00 Rp 6,900,000
Box Panel ( 60 x 60 x 20 ) cm Unit 1.000 Rp 3,950,000.00 Rp 3,950,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 1,875,000.00 Rp 1,875,000
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 2,500,000.00 Rp 2,500,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 17,630,000
Keuntungan 10% Rp 1,763,000
Total = Jumlah+(Keuntungan 10%) Rp 19,393,000

1 UNIT Pengadaan & Pemasangan PANEL SDP - AC.A Rp 21,523,975


MCCB 100-125 A/3 Phasa bh 1.000 Rp 1,970,000.00 Rp 1,970,000
MCCB 80-100 A/3 Phasa bh 1.000 Rp 750,000.00 Rp 750,000

Analisa Harga Satuan Pekerjaan MEP - page 188 of 215


NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
MCB 25 A/3 Phasa bh 1.000 Rp 190,000.00 Rp 190,000
MCB 20 A/3 Phasa bh 1.000 Rp 175,000.00 Rp 175,000
Digital Meter bh 1.000 Rp 6,900,000.00 Rp 6,900,000
Box Panel ( 60 x 60 x 20 ) cm Unit 1.000 Rp 3,950,000.00 Rp 3,950,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 2,090,250.00 Rp 2,090,250
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 2,787,000.00 Rp 2,787,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 19,567,250
Keuntungan 10% Rp 1,956,725
Total = Jumlah+(Keuntungan 10%) Rp 21,523,975

1 UNIT Pengadaan & Pemasangan PANEL PP/LP-GF.A Rp 6,562,600


MCB 16 A/3 Phasa bh 1.000 Rp 175,000.00 Rp 175,000
MCB 6 A/1 Phasa bh 13.000 Rp 45,000.00 Rp 585,000
Box Panel ( 40 x 30 x 20 ) cm Unit 1.000 Rp 3,100,000.00 Rp 3,100,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 579,000.00 Rp 579,000
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 772,000.00 Rp 772,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 5,966,000
Keuntungan 10% Rp 596,600
Total = Jumlah+(Keuntungan 10%) Rp 6,562,600

1 UNIT Pengadaan & Pemasangan PANEL PP-GF.A Rp 6,948,700


MCB 40 A/3 Phasa bh 1.000 Rp 210,000.00 Rp 210,000
MCB 10 A/1 Phasa bh 18.000 Rp 45,000.00 Rp 810,000
Box Panel ( 40 x 30 x 20 ) cm Unit 1.000 Rp 3,100,000.00 Rp 3,100,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 618,000.00 Rp 618,000
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 824,000.00 Rp 824,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 6,317,000
Keuntungan 10% Rp 631,700
Total = Jumlah+(Keuntungan 10%) Rp 6,948,700

1 UNIT Pengadaan & Pemasangan PANEL PP-AC GF.A Rp 6,362,125


MCB 16 A/3 Phasa bh 1.000 Rp 175,000.00 Rp 175,000
MCB 10 A/1 Phasa bh 10.000 Rp 45,000.00 Rp 450,000
Box Panel ( 40 x 30 x 20 ) cm Unit 1.000 Rp 3,100,000.00 Rp 3,100,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 558,750.00 Rp 558,750
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 745,000.00 Rp 745,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 5,783,750
Keuntungan 10% Rp 578,375
Total = Jumlah+(Keuntungan 10%) Rp 6,362,125

1 UNIT Pengadaan & Pemasangan PANEL PP/LP-1.A Rp 6,295,300


MCB 16 A/3 Phasa bh 1.000 Rp 175,000.00 Rp 175,000
MCB 6 A/1 Phasa bh 9.000 Rp 45,000.00 Rp 405,000
Box Panel ( 40 x 30 x 20 ) cm Unit 1.000 Rp 3,100,000.00 Rp 3,100,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 552,000.00 Rp 552,000
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 736,000.00 Rp 736,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 5,723,000
Keuntungan 10% Rp 572,300
Total = Jumlah+(Keuntungan 10%) Rp 6,295,300

1 UNIT Pengadaan & Pemasangan PANEL PP-1.A Rp 6,881,875


MCB 40 A/3 Phasa bh 1.000 Rp 210,000.00 Rp 210,000
MCB 10 A/1 Phasa bh 17.000 Rp 45,000.00 Rp 765,000
Box Panel ( 40 x 30 x 20 ) cm Unit 1.000 Rp 3,100,000.00 Rp 3,100,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 611,250.00 Rp 611,250
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 815,000.00 Rp 815,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 6,256,250
Keuntungan 10% Rp 625,625
Total = Jumlah+(Keuntungan 10%) Rp 6,881,875

1 UNIT Pengadaan & Pemasangan PANEL PP-Klinik Gigi Rp 6,295,300


MCB 16 A/3 Phasa bh 1.000 Rp 175,000.00 Rp 175,000
MCB 10 A/1 Phasa bh 9.000 Rp 45,000.00 Rp 405,000
Box Panel ( 40 x 30 x 20 ) cm Unit 1.000 Rp 3,100,000.00 Rp 3,100,000

Analisa Harga Satuan Pekerjaan MEP - page 189 of 215


NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 552,000.00 Rp 552,000
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 736,000.00 Rp 736,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 5,723,000
Keuntungan 10% Rp 572,300
Total = Jumlah+(Keuntungan 10%) Rp 6,295,300

1 UNIT Pengadaan & Pemasangan PANEL PP-Server Rp 6,295,300


MCB 20 A/3 Phasa bh 1.000 Rp 175,000.00 Rp 175,000
MCB 10 A/1 Phasa bh 9.000 Rp 45,000.00 Rp 405,000
Box Panel ( 40 x 30 x 20 ) cm Unit 1.000 Rp 3,100,000.00 Rp 3,100,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 552,000.00 Rp 552,000
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 736,000.00 Rp 736,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 5,723,000
Keuntungan 10% Rp 572,300
Total = Jumlah+(Keuntungan 10%) Rp 6,295,300

1 UNIT Pengadaan & Pemasangan PANEL PP-Pneumatic Rp 6,213,625


MCB 20 A/3 Phasa bh 1.000 Rp 175,000.00 Rp 175,000
MCB 16 A/3 Phasa bh 2.000 Rp 175,000.00 Rp 350,000
Box Panel ( 40 x 30 x 20 ) cm Unit 1.000 Rp 3,100,000.00 Rp 3,100,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 543,750.00 Rp 543,750
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 725,000.00 Rp 725,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 5,648,750
Keuntungan 10% Rp 564,875
Total = Jumlah+(Keuntungan 10%) Rp 6,213,625

1 UNIT Pengadaan & Pemasangan PANEL PP-AC 1A Rp 10,119,175


MCCB 80-100 A/3 Phasa bh 1.000 Rp 750,000.00 Rp 750,000
MCCB 50 A/3 Phasa bh 1.000 Rp 365,000.00 Rp 365,000
MCCB 40 A/3 Phasa bh 2.000 Rp 365,000.00 Rp 730,000
MCB 25 A/3 Phasa bh 1.000 Rp 190,000.00 Rp 190,000
MCB 10 A/1 Phasa bh 6.000 Rp 45,000.00 Rp 270,000
Box Panel ( 60 x 60 x 20 ) cm Unit 1.000 Rp 3,950,000.00 Rp 3,950,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 938,250.00 Rp 938,250
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 1,251,000.00 Rp 1,251,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 9,199,250
Keuntungan 10% Rp 919,925
Total = Jumlah+(Keuntungan 10%) Rp 10,119,175

1 UNIT Pengadaan & Pemasangan PANEL PP-BP/HP Rp 9,057,400


MCB 25 A/3 Phasa bh 1.000 Rp 190,000.00 Rp 190,000
MCB 20 A/3 Phasa bh 3.000 Rp 175,000.00 Rp 525,000
MCB 10 A/3 Phasa bh 5.000 Rp 175,000.00 Rp 875,000
Box Panel ( 60 x 60 x 20 ) cm Unit 1.000 Rp 3,950,000.00 Rp 3,950,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 831,000.00 Rp 831,000
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 1,108,000.00 Rp 1,108,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 8,234,000
Keuntungan 10% Rp 823,400
Total = Jumlah+(Keuntungan 10%) Rp 9,057,400
1 UNIT Pengadaan & Pemasangan PANEL MDP - B Rp 40,732,450
MCCB 630-800 A/3 Phasa bh 1.000 Rp 7,350,000.00 Rp 7,350,000
MCCB 300-400 A/3 Phasa bh 1.000 Rp 2,130,000.00 Rp 2,130,000
MCCB 175-250 A/3 Phasa bh 2.000 Rp 2,070,000.00 Rp 4,140,000
MCCB 80-100 A/3 Phasa bh 2.000 Rp 750,000.00 Rp 1,500,000
Digital Meter bh 1.000 Rp 6,900,000.00 Rp 6,900,000
Box Panel ( 80 x 60 x 30 ) cm Unit 1.000 Rp 4,850,000.00 Rp 4,850,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 4,030,500.00 Rp 4,030,500
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 5,374,000.00 Rp 5,374,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 37,029,500
Keuntungan 10% Rp 3,702,950
Total = Jumlah+(Keuntungan 10%) Rp 40,732,450

1 UNIT Pengadaan & Pemasangan PANEL SDP - GF.B Rp 28,102,525


MCCB 300-400 A/3 Phasa bh 1.000 Rp 2,130,000.00 Rp 2,130,000

Analisa Harga Satuan Pekerjaan MEP - page 190 of 215


NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
MCCB 175-250 A/3 Phasa bh 1.000 Rp 2,070,000.00 Rp 2,070,000
MCCB 80-100 A/3 Phasa bh 2.000 Rp 750,000.00 Rp 1,500,000
MCCB 63-80 A/3 Phasa bh 1.000 Rp 360,000.00 Rp 360,000
MCB 25 A/3 Phasa bh 2.000 Rp 190,000.00 Rp 380,000
MCB 20 A/3 Phasa bh 1.000 Rp 175,000.00 Rp 175,000
Digital Meter bh 1.000 Rp 6,900,000.00 Rp 6,900,000
Box Panel ( 80 x 60 x 30 ) cm Unit 1.000 Rp 4,850,000.00 Rp 4,850,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 2,754,750.00 Rp 2,754,750
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 3,673,000.00 Rp 3,673,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 25,547,750
Keuntungan 10% Rp 2,554,775
Total = Jumlah+(Keuntungan 10%) Rp 28,102,525

1 UNIT Pengadaan & Pemasangan PANEL SDP - 1B Rp 28,206,475


MCCB 175-250 A/3 Phasa bh 1.000 Rp 2,070,000.00 Rp 2,070,000
MCCB 125-160 A/3 Phasa bh 1.000 Rp 2,070,000.00 Rp 2,070,000
MCCB 63-80 A/3 Phasa bh 5.000 Rp 360,000.00 Rp 1,800,000
MCB 50 A/3 Phasa bh 1.000 Rp 395,000.00 Rp 395,000
MCB 20 A/3 Phasa bh 2.000 Rp 175,000.00 Rp 350,000
Digital Meter bh 1.000 Rp 6,900,000.00 Rp 6,900,000
Box Panel ( 80 x 60 x 30 ) cm Unit 1.000 Rp 4,850,000.00 Rp 4,850,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 2,765,250.00 Rp 2,765,250
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 3,687,000.00 Rp 3,687,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 25,642,250
Keuntungan 10% Rp 2,564,225
Total = Jumlah+(Keuntungan 10%) Rp 28,206,475
1 UNIT Pengadaan & Pemasangan PANEL SDP - AC.B Rp 23,974,225
MCCB 175-250 A/3 Phasa bh 1.000 Rp 2,070,000.00 Rp 2,070,000
MCCB 140-200 A/3 Phasa bh 1.000 Rp 2,070,000.00 Rp 2,070,000
MCB 32 A/3 Phasa bh 2.000 Rp 210,000.00 Rp 420,000
MCB 16 A/3 Phasa bh 1.000 Rp 175,000.00 Rp 175,000
Digital Meter bh 1.000 Rp 6,900,000.00 Rp 6,900,000
Box Panel ( 60 x 60 x 20 ) cm Unit 1.000 Rp 3,950,000.00 Rp 3,950,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 2,337,750.00 Rp 2,337,750
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 3,117,000.00 Rp 3,117,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 21,794,750
Keuntungan 10% Rp 2,179,475
Total = Jumlah+(Keuntungan 10%) Rp 23,974,225

1 UNIT Pengadaan & Pemasangan PANEL PP/LP-GF.B Rp 7,164,025


MCB 16 A/3 Phasa bh 1.000 Rp 175,000.00 Rp 175,000
MCB 6 A/1 Phasa bh 22.000 Rp 45,000.00 Rp 990,000
Box Panel ( 40 x 30 x 20 ) cm Unit 1.000 Rp 3,100,000.00 Rp 3,100,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 639,750.00 Rp 639,750
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 853,000.00 Rp 853,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 6,512,750
Keuntungan 10% Rp 651,275
Total = Jumlah+(Keuntungan 10%) Rp 7,164,025

1 UNIT Pengadaan & Pemasangan PANEL PP-GF.B Rp 9,837,025


MCCB 63-80 A/3 Phasa bh 1.000 Rp 360,000.00 Rp 360,000
MCB 10 A/1 Phasa bh 39.000 Rp 45,000.00 Rp 1,755,000
Box Panel ( 60 x 60 x 20 ) cm Unit 1.000 Rp 3,950,000.00 Rp 3,950,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 909,750.00 Rp 909,750
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 1,213,000.00 Rp 1,213,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 8,942,750
Keuntungan 10% Rp 894,275
Total = Jumlah+(Keuntungan 10%) Rp 9,837,025

1 UNIT Pengadaan & Pemasangan PANEL PP-AC GF.B Rp 6,896,725


MCB 20 A/3 Phasa bh 1.000 Rp 175,000.00 Rp 175,000
MCB 10 A/1 Phasa bh 18.000 Rp 45,000.00 Rp 810,000
Box Panel ( 40 x 30 x 20 ) cm Unit 1.000 Rp 3,100,000.00 Rp 3,100,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 612,750.00 Rp 612,750
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 817,000.00 Rp 817,000
Grounding BC 120 mm2 Ls 1.000 Rp - Rp -
Mandor hari 1.000 Rp 155,000.00 Rp 155,000

Analisa Harga Satuan Pekerjaan MEP - page 191 of 215


NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 6,269,750
Keuntungan 10% Rp 626,975
Total = Jumlah+(Keuntungan 10%) Rp 6,896,725

1 UNIT Pengadaan & Pemasangan PANEL LP-1.B Rp 7,119,475


MCB 25 A/3 Phasa bh 1.000 Rp 190,000.00 Rp 190,000
MCB 6 A/1 Phasa bh 21.000 Rp 45,000.00 Rp 945,000
Box Panel ( 40 x 30 x 20 ) cm Unit 1.000 Rp 3,100,000.00 Rp 3,100,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 635,250.00 Rp 635,250
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 847,000.00 Rp 847,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 6,472,250
Keuntungan 10% Rp 647,225
Total = Jumlah+(Keuntungan 10%) Rp 7,119,475

1 UNIT Pengadaan & Pemasangan PANEL PP-1.B Rp 7,973,350


MCCB 63-80 A/3 Phasa bh 1.000 Rp 360,000.00 Rp 360,000
MCB 10 A/1 Phasa bh 30.000 Rp 45,000.00 Rp 1,350,000
Box Panel ( 40 x 30 x 20 ) cm Unit 1.000 Rp 3,100,000.00 Rp 3,100,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 721,500.00 Rp 721,500
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 962,000.00 Rp 962,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 7,248,500
Keuntungan 10% Rp 724,850
Total = Jumlah+(Keuntungan 10%) Rp 7,973,350

1 UNIT Pengadaan & Pemasangan PANEL PP-AC 1B Rp 13,675,750


MCCB 140-200 A/3 Phasa bh 1.000 Rp 2,070,000.00 Rp 2,070,000
MCCB 50 A/3 Phasa bh 1.000 Rp 365,000.00 Rp 365,000
MCCB 40 A/3 Phasa bh 3.000 Rp 365,000.00 Rp 1,095,000
MCB 25 A/3 Phasa bh 1.000 Rp 190,000.00 Rp 190,000
MCB 16 A/3 Phasa bh 2.000 Rp 175,000.00 Rp 350,000
MCB 10 A/1 Phasa bh 14.000 Rp 45,000.00 Rp 630,000
Box Panel ( 60 x 60 x 20 ) cm Unit 1.000 Rp 3,950,000.00 Rp 3,950,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 1,297,500.00 Rp 1,297,500
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 1,730,000.00 Rp 1,730,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 12,432,500
Keuntungan 10% Rp 1,243,250
Total = Jumlah+(Keuntungan 10%) Rp 13,675,750

1 UNIT Pengadaan & Pemasangan PANEL PP-AHU OK Rp 12,569,425


MCCB 125-160 A/3 Phasa bh 1.000 Rp 2,070,000.00 Rp 2,070,000
MCCB 50 A/3 Phasa bh Rp 365,000.00 Rp -
MCCB 40 A/3 Phasa bh 3.000 Rp 365,000.00 Rp 1,095,000
MCB 25 A/3 Phasa bh 3.000 Rp 190,000.00 Rp 570,000
MCB 16 A/3 Phasa bh 1.000 Rp 175,000.00 Rp 175,000
MCB 10 A/1 Phasa bh 1.000 Rp 45,000.00 Rp 45,000
Box Panel ( 60 x 60 x 20 ) cm Unit 1.000 Rp 3,950,000.00 Rp 3,950,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 1,185,750.00 Rp 1,185,750
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 1,581,000.00 Rp 1,581,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 11,426,750
Keuntungan 10% Rp 1,142,675
Total = Jumlah+(Keuntungan 10%) Rp 12,569,425

1 UNIT Pengadaan & Pemasangan PANEL PP-Lif-B Rp 8,448,550


MCCB 50 A/3 Phasa bh 1.000 Rp 365,000.00 Rp 365,000
MCB 32 A/3 Phasa bh 2.000 Rp 210,000.00 Rp 420,000
MCB 16 A/3 Phasa bh 2.000 Rp 175,000.00 Rp 350,000
MCB 10 A/1 Phasa bh 1.000 Rp 45,000.00 Rp 45,000
Box Panel ( 60 x 60 x 20 ) cm Unit 1.000 Rp 3,950,000.00 Rp 3,950,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 769,500.00 Rp 769,500
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 1,026,000.00 Rp 1,026,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 7,680,500
Keuntungan 10% Rp 768,050
Total = Jumlah+(Keuntungan 10%) Rp 8,448,550

1 UNIT Pengadaan & Pemasangan PANEL PP-CT-Scan Rp 13,156,000


MCCB 175-250 A/3 Phasa bh 2.000 Rp 2,070,000.00 Rp 4,140,000

Analisa Harga Satuan Pekerjaan MEP - page 192 of 215


NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
MCB 32 A/3 Phasa bh 1.000 Rp 210,000.00 Rp 210,000
Box Panel ( 60 x 60 x 20 ) cm Unit 1.000 Rp 3,950,000.00 Rp 3,950,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 1,245,000.00 Rp 1,245,000
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 1,660,000.00 Rp 1,660,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 11,960,000
Keuntungan 10% Rp 1,196,000
Total = Jumlah+(Keuntungan 10%) Rp 13,156,000

1 UNIT Pengadaan & Pemasangan PANEL PP-X- ray Rp 9,235,600


MCCB 80-100 A/3 Phasa bh 2.000 Rp 750,000.00 Rp 1,500,000
MCB 32 A/3 Phasa bh 1.000 Rp 210,000.00 Rp 210,000
Box Panel ( 60 x 60 x 20 ) cm Unit 1.000 Rp 3,950,000.00 Rp 3,950,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 849,000.00 Rp 849,000
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 1,132,000.00 Rp 1,132,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 8,396,000
Keuntungan 10% Rp 839,600
Total = Jumlah+(Keuntungan 10%) Rp 9,235,600

1 UNIT Pengadaan & Pemasangan PANEL PP-CSSD Rp 6,094,825


MCB 16 A/3 Phasa bh 1.000 Rp 175,000.00 Rp 175,000
MCB 10 A/1 Phasa bh 6.000 Rp 45,000.00 Rp 270,000
Box Panel ( 40 x 30 x 20 ) cm Unit 1.000 Rp 3,100,000.00 Rp 3,100,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 531,750.00 Rp 531,750
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 709,000.00 Rp 709,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 5,540,750
Keuntungan 10% Rp 554,075
Total = Jumlah+(Keuntungan 10%) Rp 6,094,825

1 UNIT Pengadaan & Pemasangan PANEL MDP - C Rp 33,708,400


MCCB 250-350 A/3 Phasa bh 1.000 Rp 2,130,000.00 Rp 2,130,000
MCCB 140-200 A/3 Phasa bh 1.000 Rp 2,070,000.00 Rp 2,070,000
MCCB 100-125 A/3 Phasa bh 2.000 Rp 1,970,000.00 Rp 3,940,000
MCCB 80-100 A/3 Phasa bh 3.000 Rp 750,000.00 Rp 2,250,000
MCCB 50 A/3 Phasa bh Rp 365,000.00 Rp -
Digital Meter bh 1.000 Rp 6,900,000.00 Rp 6,900,000
Box Panel ( 80 x 60 x 30 ) cm Unit 1.000 Rp 4,850,000.00 Rp 4,850,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 3,321,000.00 Rp 3,321,000
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 4,428,000.00 Rp 4,428,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 30,644,000
Keuntungan 10% Rp 3,064,400
Total = Jumlah+(Keuntungan 10%) Rp 33,708,400

1 UNIT Pengadaan & Pemasangan PANEL SDP - GF C Rp 22,132,825


MCCB 100-125 A/3 Phasa bh 1.000 Rp 1,970,000.00 Rp 1,970,000
MCCB 80-100 A/3 Phasa bh 1.000 Rp 750,000.00 Rp 750,000
MCB 50 A/3 Phasa bh 1.000 Rp 395,000.00 Rp 395,000
MCB 25 A/3 Phasa bh 2.000 Rp 190,000.00 Rp 380,000
Digital Meter bh 1.000 Rp 6,900,000.00 Rp 6,900,000
Box Panel ( 60 x 60 x 20 ) cm Unit 1.000 Rp 3,950,000.00 Rp 3,950,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 2,151,750.00 Rp 2,151,750
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 2,869,000.00 Rp 2,869,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 20,120,750
Keuntungan 10% Rp 2,012,075
Total = Jumlah+(Keuntungan 10%) Rp 22,132,825

1 UNIT Pengadaan & Pemasangan PANEL SDP - 1C Rp 22,043,725


MCCB 100-125 A/3 Phasa bh 1.000 Rp 1,970,000.00 Rp 1,970,000
MCCB 80-100 A/3 Phasa bh 1.000 Rp 750,000.00 Rp 750,000
MCCB 50 A/3 Phasa bh 1.000 Rp 365,000.00 Rp 365,000
MCB 20 A/3 Phasa bh 2.000 Rp 175,000.00 Rp 350,000
Digital Meter bh 1.000 Rp 6,900,000.00 Rp 6,900,000
Box Panel ( 60 x 60 x 20 ) cm Unit 1.000 Rp 3,950,000.00 Rp 3,950,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 2,142,750.00 Rp 2,142,750
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 2,857,000.00 Rp 2,857,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000

Analisa Harga Satuan Pekerjaan MEP - page 193 of 215


NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Jumlah Rp 20,039,750
Keuntungan 10% Rp 2,003,975
Total = Jumlah+(Keuntungan 10%) Rp 22,043,725

1 UNIT Pengadaan & Pemasangan PANEL SDP - AC.C Rp 23,922,250


MCCB 140-200 A/3 Phasa bh 2.000 Rp 2,070,000.00 Rp 4,140,000
MCCB 80-100 A/3 Phasa bh Rp 750,000.00 Rp -
MCB 32 A/3 Phasa bh 1.000 Rp 210,000.00 Rp 210,000
MCB 20 A/3 Phasa bh 2.000 Rp 175,000.00 Rp 350,000
Digital Meter bh 1.000 Rp 6,900,000.00 Rp 6,900,000
Box Panel ( 60 x 60 x 20 ) cm Unit 1.000 Rp 3,950,000.00 Rp 3,950,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 2,332,500.00 Rp 2,332,500
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 3,110,000.00 Rp 3,110,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 21,747,500
Keuntungan 10% Rp 2,174,750
Total = Jumlah+(Keuntungan 10%) Rp 23,922,250
1 UNIT Pengadaan & Pemasangan PANEL LP-GF.C Rp 7,097,200
MCB 16 A/3 Phasa bh 1.000 Rp 175,000.00 Rp 175,000
MCB 6 A/1 Phasa bh 21.000 Rp 45,000.00 Rp 945,000
Box Panel ( 40 x 30 x 20 ) cm Unit 1.000 Rp 3,100,000.00 Rp 3,100,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 633,000.00 Rp 633,000
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 844,000.00 Rp 844,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 6,452,000
Keuntungan 10% Rp 645,200
Total = Jumlah+(Keuntungan 10%) Rp 7,097,200

1 UNIT Pengadaan & Pemasangan PANEL PP-GF.C Rp 10,416,175


MCCB 80-100 A/3 Phasa bh 1.000 Rp 750,000.00 Rp 750,000
MCB 10 A/1 Phasa bh 39.000 Rp 45,000.00 Rp 1,755,000
Box Panel ( 60 x 60 x 20 ) cm Unit 1.000 Rp 3,950,000.00 Rp 3,950,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 968,250.00 Rp 968,250
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 1,291,000.00 Rp 1,291,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 9,469,250
Keuntungan 10% Rp 946,925
Total = Jumlah+(Keuntungan 10%) Rp 10,416,175

1 UNIT Pengadaan & Pemasangan PANEL P-1.C Rp 6,696,250


MCB 16 A/3 Phasa bh 1.000 Rp 175,000.00 Rp 175,000
MCB 6 A/1 Phasa bh 15.000 Rp 45,000.00 Rp 675,000
Box Panel ( 40 x 30 x 20 ) cm Unit 1.000 Rp 3,100,000.00 Rp 3,100,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 592,500.00 Rp 592,500
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 790,000.00 Rp 790,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 6,087,500
Keuntungan 10% Rp 608,750
Total = Jumlah+(Keuntungan 10%) Rp 6,696,250

1 UNIT Pengadaan & Pemasangan PANEL PP-1.C Rp 10,416,175


MCCB 80-100 A/3 Phasa bh 1.000 Rp 750,000.00 Rp 750,000
MCB 10 A/1 Phasa bh 39.000 Rp 45,000.00 Rp 1,755,000
Box Panel ( 60 x 60 x 20 ) cm Unit 1.000 Rp 3,950,000.00 Rp 3,950,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 968,250.00 Rp 968,250
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 1,291,000.00 Rp 1,291,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 9,469,250
Keuntungan 10% Rp 946,925
Total = Jumlah+(Keuntungan 10%) Rp 10,416,175

1 UNIT Pengadaan & Pemasangan PANEL PP-AC GF.C Rp 6,428,950


MCB 16 A/3 Phasa bh 1.000 Rp 175,000.00 Rp 175,000
MCB 10 A/1 Phasa bh 11.000 Rp 45,000.00 Rp 495,000
Box Panel ( 40 x 30 x 20 ) cm Unit 1.000 Rp 3,100,000.00 Rp 3,100,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 565,500.00 Rp 565,500
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 754,000.00 Rp 754,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 5,844,500

Analisa Harga Satuan Pekerjaan MEP - page 194 of 215


NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Keuntungan 10% Rp 584,450
Total = Jumlah+(Keuntungan 10%) Rp 6,428,950

1 UNIT Pengadaan & Pemasangan PANEL PP-AC 1C Rp 13,631,200


MCCB 140-200 A/3 Phasa bh 1.000 Rp 2,070,000.00 Rp 2,070,000
MCCB 50 A/3 Phasa bh 3.000 Rp 365,000.00 Rp 1,095,000
MCCB 40 A/3 Phasa bh 2.000 Rp 365,000.00 Rp 730,000
MCB 25 A/3 Phasa bh 1.000 Rp 190,000.00 Rp 190,000
MCB 10 A/1 Phasa bh 13.000 Rp 45,000.00 Rp 585,000
Box Panel ( 60 x 60 x 20 ) cm Unit 1.000 Rp 3,950,000.00 Rp 3,950,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 1,293,000.00 Rp 1,293,000
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 1,724,000.00 Rp 1,724,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 12,392,000
Keuntungan 10% Rp 1,239,200
Total = Jumlah+(Keuntungan 10%) Rp 13,631,200

1 UNIT Pengadaan & Pemasangan PANEL PP-LF.C Rp 6,369,550


MCB 40 A/3 Phasa bh 1.000 Rp 210,000.00 Rp 210,000
MCB 32 A/3 Phasa bh 2.000 Rp 210,000.00 Rp 420,000
Box Panel ( 40 x 30 x 20 ) cm Unit 1.000 Rp 3,100,000.00 Rp 3,100,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 559,500.00 Rp 559,500
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 746,000.00 Rp 746,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 5,790,500
Keuntungan 10% Rp 579,050
Total = Jumlah+(Keuntungan 10%) Rp 6,369,550

1 UNIT Pengadaan & Pemasangan PANEL PP/ LP-D Rp 7,572,400


MCCB 63-80 A/3 Phasa bh 1.000 Rp 360,000.00 Rp 360,000
MCB 10 A/1 Phasa bh 21.000 Rp 45,000.00 Rp 945,000
MCB 6 A/1 Phasa bh 3.000 Rp 45,000.00 Rp 135,000
Box Panel ( 40 x 30 x 20 ) cm Unit 1.000 Rp 3,100,000.00 Rp 3,100,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 681,000.00 Rp 681,000
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 908,000.00 Rp 908,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 6,884,000
Keuntungan 10% Rp 688,400
Total = Jumlah+(Keuntungan 10%) Rp 7,572,400

1 UNIT Pengadaan & Pemasangan PANEL PP-LD Rp 7,253,125


MCB 20 A/3 Phasa bh 1.000 Rp 175,000.00 Rp 175,000
MCB 10 A/3 Phasa bh 6.000 Rp 175,000.00 Rp 1,050,000
MCB 6 A/1 Phasa bh Rp 45,000.00 Rp -
Box Panel ( 40 x 30 x 20 ) cm Unit 1.000 Rp 3,100,000.00 Rp 3,100,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 648,750.00 Rp 648,750
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 865,000.00 Rp 865,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 6,593,750
Keuntungan 10% Rp 659,375
Total = Jumlah+(Keuntungan 10%) Rp 7,253,125

1 UNIT Pengadaan & Pemasangan PANEL PP. LP-F Rp 6,881,875


MCB 20 A/3 Phasa bh 1.000 Rp 175,000.00 Rp 175,000
MCB 16 A/3 Phasa bh 2.000 Rp 175,000.00 Rp 350,000
MCB 10 A/1 Phasa bh 9.000 Rp 45,000.00 Rp 405,000
MCB 6 A/1 Phasa bh 1.000 Rp 45,000.00 Rp 45,000
Box Panel ( 40 x 30 x 20 ) cm Unit 1.000 Rp 3,100,000.00 Rp 3,100,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 611,250.00 Rp 611,250
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 815,000.00 Rp 815,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 6,256,250
Keuntungan 10% Rp 625,625
Total = Jumlah+(Keuntungan 10%) Rp 6,881,875

1 UNIT Pengadaan & Pemasangan PANEL PP. LP-G Rp 6,161,650


MCB 16 A/3 Phasa bh 1.000 Rp 175,000.00 Rp 175,000
MCB 10 A/1 Phasa bh 7.000 Rp 45,000.00 Rp 315,000
Box Panel ( 40 x 30 x 20 ) cm Unit 1.000 Rp 3,100,000.00 Rp 3,100,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 538,500.00 Rp 538,500
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 718,000.00 Rp 718,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000

Analisa Harga Satuan Pekerjaan MEP - page 195 of 215


NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 5,601,500
Keuntungan 10% Rp 560,150
Total = Jumlah+(Keuntungan 10%) Rp 6,161,650

1 UNIT Pengadaan & Pemasangan PANEL PP. R.45 Rp 6,228,475


MCB 20 A/3 Phasa bh 1.000 Rp 175,000.00 Rp 175,000
MCB 10 A/1 Phasa bh 6.000 Rp 45,000.00 Rp 270,000
MCB 6 A/1 Phasa bh 2.000 Rp 45,000.00 Rp 90,000
Box Panel ( 40 x 30 x 20 ) cm Unit 1.000 Rp 3,100,000.00 Rp 3,100,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 545,250.00 Rp 545,250
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 727,000.00 Rp 727,000
Grounding BC 120 mm2 Ls 1.000 Rp -
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 5,662,250
Keuntungan 10% Rp 566,225
Total = Jumlah+(Keuntungan 10%) Rp 6,228,475

1 UNIT Pengadaan & Pemasangan PANEL PP. R.70 Rp 7,662,820


MCB 20 A/3 Phasa bh 1.000 Rp 175,000.00 Rp 175,000
MCB 10 A/1 Phasa bh 7.000 Rp 45,000.00 Rp 315,000
MCB 6 A/1 Phasa bh 2.000 Rp 45,000.00 Rp 90,000
Box Panel ( 40 x 30 x 20 ) cm Unit 1.000 Rp 3,100,000.00 Rp 3,100,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 552,000.00 Rp 552,000
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 736,000.00 Rp 736,000
Grounding BC 120 mm2 Ls 1.000 Rp 1,243,200.00 Rp 1,243,200
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 6,966,200
Keuntungan 10% Rp 696,620
Total = Jumlah+(Keuntungan 10%) Rp 7,662,820

1 UNIT Pengadaan & Pemasangan PANEL PP/LP - PH Rp 9,281,470


MCB 16 A/3 Phasa bh 1.000 Rp 175,000.00 Rp 175,000
MCB 10 A/1 Phasa bh 3.000 Rp 45,000.00 Rp 135,000
MCB 6 A/1 Phasa bh 8.000 Rp 45,000.00 Rp 360,000
Timer switch bh 5.000 Rp 200,000.00 Rp 1,000,000
Box Panel ( 40 x 30 x 20 ) cm Unit 1.000 Rp 3,100,000.00 Rp 3,100,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 715,500.00 Rp 715,500
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 954,000.00 Rp 954,000
Grounding BC 120 mm2 Ls 1.000 Rp 1,243,200.00 Rp 1,243,200
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 8,437,700
Keuntungan 10% Rp 843,770
Total = Jumlah+(Keuntungan 10%) Rp 9,281,470

1 UNIT Pengadaan & Pemasangan PANEL PP/LP - FH Rp 15,288,295


MCCB 175-250 A/3 Phasa bh 1.000 Rp 2,070,000.00 Rp 2,070,000
MCCB 140-200 A/3 Phasa bh 1.000 Rp 2,070,000.00 Rp 2,070,000
MCB 20 A/3 Phasa bh 2.000 Rp 175,000.00 Rp 350,000
CT 80/5 bh 3.000 Rp 125,000.00 Rp 375,000
Box Panel ( 60 x 60 x 20 ) cm Unit 1.000 Rp 3,950,000.00 Rp 3,950,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 1,322,250.00 Rp 1,322,250
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 1,763,000.00 Rp 1,763,000
Grounding BC 120 mm2 Ls 1.000 Rp 1,243,200.00 Rp 1,243,200
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 13,898,450
Keuntungan 10% Rp 1,389,845
Total = Jumlah+(Keuntungan 10%) Rp 15,288,295

1 UNIT Pengadaan & Pemasangan PANEL PP - AB Rp 7,930,120


MCB 25 A/3 Phasa bh 1.000 Rp 190,000.00 Rp 190,000
MCB 16 A/3 Phasa bh 1.000 Rp 175,000.00 Rp 175,000
MCB 10 A/3 Phasa bh 2.000 Rp 175,000.00 Rp 350,000
MCB 10 A/1 Phasa bh 1.000 Rp 45,000.00 Rp 45,000
Box Panel ( 40 x 30 x 20 ) cm Unit 1.000 Rp 3,100,000.00 Rp 3,100,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 579,000.00 Rp 579,000
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 772,000.00 Rp 772,000
Grounding BC 120 mm2 Ls 1.000 Rp 1,243,200.00 Rp 1,243,200
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 7,209,200
Keuntungan 10% Rp 720,920
Total = Jumlah+(Keuntungan 10%) Rp 7,930,120

Analisa Harga Satuan Pekerjaan MEP - page 196 of 215


NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL

1 UNIT Pengadaan & Pemasangan PANEL PP - GM Rp 8,902,795


MCCB 40 A/3 Phasa bh 1.000 Rp 365,000.00 Rp 365,000
MCB 16 A/3 Phasa bh 3.000 Rp 175,000.00 Rp 525,000
MCB 10 A/3 Phasa bh 3.000 Rp 175,000.00 Rp 525,000
Box Panel ( 40 x 30 x 20 ) cm Unit 1.000 Rp 3,100,000.00 Rp 3,100,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 677,250.00 Rp 677,250
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 903,000.00 Rp 903,000
Grounding BC 120 mm2 Ls 1.000 Rp 1,243,200.00 Rp 1,243,200
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 8,093,450
Keuntungan 10% Rp 809,345
Total = Jumlah+(Keuntungan 10%) Rp 8,902,795

1 UNIT Pengadaan & Pemasangan PANEL LP -PL Rp 8,271,670


MCB 16 A/3 Phasa bh 1.000 Rp 175,000.00 Rp 175,000
MCB 10 A/3 Phasa bh 3.000 Rp 175,000.00 Rp 525,000
MCB 10 A/1 Phasa bh 2.000 Rp 45,000.00 Rp 90,000
Timer switch bh 1.000 Rp 200,000.00 Rp 200,000
Box Panel ( 40 x 30 x 20 ) cm Unit 1.000 Rp 3,100,000.00 Rp 3,100,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 613,500.00 Rp 613,500
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 818,000.00 Rp 818,000
Grounding BC 120 mm2 Ls 1.000 Rp 1,243,200.00 Rp 1,243,200
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 7,519,700
Keuntungan 10% Rp 751,970
Total = Jumlah+(Keuntungan 10%) Rp 8,271,670

1 UNIT Pengadaan & Pemasangan PANEL SDP- H Rp 22,089,595


MCCB 63-80 A/3 Phasa bh 1.000 Rp 360,000.00 Rp 360,000
MCCB 50 A/3 Phasa bh 3.000 Rp 365,000.00 Rp 1,095,000
MCB 25 A/3 Phasa bh 1.000 Rp 190,000.00 Rp 190,000
Digital Meter bh 1.000 Rp 6,900,000.00 Rp 6,900,000
Box Panel ( 80 x 60 x 30 ) cm Unit 1.000 Rp 4,850,000.00 Rp 4,850,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 2,009,250.00 Rp 2,009,250
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 2,679,000.00 Rp 2,679,000
Grounding BC 120 mm2 Ls 1.000 Rp 1,243,200.00 Rp 1,243,200
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 20,081,450
Keuntungan 10% Rp 2,008,145
Total = Jumlah+(Keuntungan 10%) Rp 22,089,595

1 UNIT Pengadaan & Pemasangan PANEL PP/LP-H Rp 9,571,045


MCB 40 A/3 Phasa bh 1.000 Rp 210,000.00 Rp 210,000
MCB 10 A/3 Phasa bh 1.000 Rp 175,000.00 Rp 175,000
MCB 10 A/1 Phasa bh 11.000 Rp 45,000.00 Rp 495,000
MCB 6 A/1 Phasa bh 3.000 Rp 45,000.00 Rp 135,000
Box Panel ( 60 x 60 x 20 ) cm Unit 1.000 Rp 3,950,000.00 Rp 3,950,000
Alat dan Material Bantu (Bus Bar, Energy meter apabila ada di gambar, Ls 1.000 Rp 744,750.00 Rp 744,750
Pilot Lamp, Kabel Control, dan aksesoris lain sesuai gambar)
Wiring Ls 1.000 Rp 993,000.00 Rp 993,000
Grounding BC 120 mm2 Ls 1.000 Rp 1,243,200.00 Rp 1,243,200
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 8,700,950
Keuntungan 10% Rp 870,095
Total = Jumlah+(Keuntungan 10%) Rp 9,571,045

1 UNIT Pengadaan & Pemasangan PANEL PP - OK, ICU/NICU Rp -


LBS 3P 63 A INS- 63 pcs 1.00 Rp -
MCB 2P-10KA 10 A / iC-60HC pcs 1.00 Rp -
MCB 2P- 6KA 16 A / iC-60N pcs 2.00 Rp -
MCB 2P- 6KA 10 A / iC-60N pcs 4.00 Rp -
MCB 2P- 6KA 6 A / iC-60N pcs 12.00 Rp -
MULTICLIP 80A pcs 2.00 Rp -
ISOLATION TRANSFORMER 1-PHASE/10 kVA, IMD-IT-S100-H pcs 1.00 Rp -
VIGILOHM, IMD-IM20-H pcs 1.000 Rp -
HRP (HOSPITAL REMOTE PANEL), 50168 pcs 1.000 Rp -
FAULT LOCATOR, IMDIFL12H pcs 2.000 Rp -
TOROID, 50437 pcs 16.000 Rp -
GATEWAY, EGX150 pcs 1.000 Rp -
PME BASE LICENSE, PSWSANCZZSPEZZ pcs 1.000 Rp -
DEVICE LICENSE, PSWDENCZZNPEZZ pcs 1.000 Rp -
POWER ADVISOR, PSWPAPRIME lot 1.000 Rp -
COS 4P - 63A pcs 1.000 Rp -
CONT. 3P.AC.3 65 A / LC1-D65A M7 pcs 2.000 Rp -
LAD-N22 2/2 pcs 2.000 Rp -

Analisa Harga Satuan Pekerjaan MEP - page 197 of 215


NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
CT 75/5 A pcs 1.000 Rp -
VOLTMETER 0 - 500 V (96x96) pcs 1.000 Rp -
AMPEREMETER 0 - 50 A (96x96) pcs 1.000 Rp -
PIlot LAMP, XB4-BVM3 (220VAC HIJAU) pcs 1.000 Rp -
PIlot LAMP, XB4-BVM4 (220VAC MERAH) pcs 1.000 Rp -
PIlot LAMP, XB4-BVM5 (220VAC KUNING) pcs 1.000 Rp -
FUSE 2A 1P (10.3 x 38) gG TYPE pcs 3.000 Rp -
BATTERY CHARGER 5A pcs 3.000 Rp -
BATTERY FOR BACK UP (PURE SINUS) pcs 1.000 Rp -
POWER SUPPLY 1P 100...240 VAC /24 VDC 5A 120W pcs 1.000 Rp -
MCB 1P- 4.5KA 6 A / iK-60a pcs 104.000 Rp -
LBS 4P 40 A INS- 40 pcs 1.000 Rp -
SURGE ARESTER PRD8r 8KA 3P+N pcs 1.000 Rp -
TERMINAL BLOCK 24mm pcs 4.000 Rp -
TERMINAL BLOCK 10mm pcs 44.000 Rp -
LABEL lot 1.000 Rp -
BOX - FREE STANDING Type
2200H x 600W x 600D, IEC 61439 Type Test, IP31, 10kA, Form 2a, unit 1.000 Rp -
- Without Door, Indoor, PRISMA iPM
BUSBAR (CU) lot 1.000 Rp -
Mandor hari 0.500 Rp -
Kepala Tukang hari 1.000 Rp -
Tukang hari 1.000 Rp -
Jumlah Rp -
Keuntungan 10% Rp -
Total = Jumlah+(Keuntungan 10%) Rp -
1 UNIT Pengadaan & Pemasangan UPS 5 KVA / 3 PHASE Rp 415,250
UPS (Back Up Time 15 Menit ) kap. 5 Kva bh 1.000 Rp - Rp -
Material Bantu Ls 1.000 Rp - Rp -
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Kepala Tukang+D1652 hari 1.000 Rp 155,000.00 Rp 155,000
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Jumlah Rp 377,500
Keuntungan 10% Rp 37,750
Total = Jumlah+(Keuntungan 10%) Rp 415,250

1 UNIT Pengadaan & Pemasangan UPS 10 KVA / 1 phase backup time 30 menit Rp 415,250
UPS (Back Up Time 30 Menit ) kap. 10 Kva bh 1.000 Rp - Rp -
Material Bantu Ls 1.000 Rp - Rp -
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Kepala Tukang hari 1.000 Rp 155,000.00 Rp 155,000
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Jumlah Rp 377,500
Keuntungan 10% Rp 37,750
Total = Jumlah+(Keuntungan 10%) Rp 415,250

1 UNIT Pengadaan & Pemasangan UPS 10 KVA / 3 phase backup time 15 menit Rp 86,669,000
UPS (Back Up Time 15 Menit ) kap. 10 Kva bh 1.000 Rp 76,500,000.00 Rp 76,500,000
Material Bantu Ls 1.000 Rp 1,912,500.00 Rp 1,912,500
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Kepala Tukang hari 1.000 Rp 155,000.00 Rp 155,000
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Jumlah Rp 78,790,000
Keuntungan 10% Rp 7,879,000
Total = Jumlah+(Keuntungan 10%) Rp 86,669,000

1 M' Pengadaan & Pemasangan KABEL TM, N2XSEBY 3 ( 1 X 120 mm2 ) Rp 69,000
Kabel N2XSEBY 3 ( 1 x 120 mm2 ) M' 1.000 Rp - Rp -
Kabel skun, Vilnyl, dll set 1.000 Rp - Rp -
Galian & urugan M1 1.000 Rp -
Mandor hari 0.083 Rp 155,000.00 Rp 12,917
Kepala Tukang hari 0.167 Rp 155,000.00 Rp 25,833
Tukang hari 0.167 Rp 145,000.00 Rp 24,167
Jumlah Rp 62,917
Keuntungan 10% Rp 6,292
Total = Jumlah+(Keuntungan 10%) Rp 69,208
1 M' Pengadaan & Pemasangan KABEL TM, N2XSY 3 ( 1 X 120 mm2) Rp 69,000
Kabel N2XSY 3 ( 1 x 120 mm2 ) M' 1.000 Rp - Rp -
Kabel skun, Vilnyl, dll set 1.000 Rp - Rp -
Galian & urugan M1 1.000 Rp -
Mandor hari 0.083 Rp 155,000.00 Rp 12,917
Kepala Tukang hari 0.167 Rp 155,000.00 Rp 25,833
Tukang hari 0.167 Rp 145,000.00 Rp 24,167
Jumlah Rp 62,917
Keuntungan 10% Rp 6,292
Total = Jumlah+(Keuntungan 10%) Rp 69,208
1 M' Pengadaan & Pemasangan KABEL TR, NYA 4 X 1 x 1,5 mm2 Rp 18,000
Kabel NYY 1 x 1,5 mm2 M' 4.000 Rp 2,679.00 Rp 10,716
Kabel skun, Vilnyl, dll set 1.000 Rp 535.80 Rp 536
Mandor hari 0.007 Rp 155,000.00 Rp 1,107
Kepala Tukang hari 0.014 Rp 155,000.00 Rp 2,214
Tukang hari 0.014 Rp 145,000.00 Rp 2,071
Jumlah Rp 16,645
Keuntungan 10% Rp 1,664
Total = Jumlah+(Keuntungan 10%) Rp 18,309
1 M' Pengadaan & Pemasangan KABEL TR, NYMHY 3 x 2,5 mm2 Rp 27,000
Kabel NYMHY 3 x 2,5 mm2 M' 1.000 Rp 18,500.00 Rp 18,500
Kabel skun, Vilnyl, dll set 1.000 Rp 925.00 Rp 925
Analisa Harga Satuan Pekerjaan MEP - page 198 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Mandor hari 0.007 Rp 155,000.00 Rp 1,107
Kepala Tukang hari 0.014 Rp 155,000.00 Rp 2,214
Tukang hari 0.014 Rp 145,000.00 Rp 2,071
Jumlah Rp 24,818
Keuntungan 10% Rp 2,482
Total = Jumlah+(Keuntungan 10%) Rp 27,300
1 M' Pengadaan & Pemasangan KABEL kontrol NYMHY 5 x 1,5 mm2 Rp 5,000
Kabel NYMHY 5 x 1,5 mm2 M' 1.000 Rp -
Kabel skun, Vilnyl, dll set 1.000 Rp -
Mandor hari 0.007 Rp -
Kepala Tukang hari 0.014 Rp 155,000.00 Rp 2,214
Tukang hari 0.014 Rp 145,000.00 Rp 2,071
Jumlah Rp 4,286
Keuntungan 10% Rp 429
Total = Jumlah+(Keuntungan 10%) Rp 4,714
1 M' Pengadaan & Pemasangan KABEL TR, NYMHY 10 x 1,5 mm2 Rp 6,000
Kabel NYMHY 10 x 1,5 mm2 M' 1.000 Rp -
Kabel skun, Vilnyl, dll set 1.000 Rp -
Mandor hari 0.007 Rp 155,000.00 Rp 1,107
Kepala Tukang hari 0.014 Rp 155,000.00 Rp 2,214
Tukang hari 0.014 Rp 145,000.00 Rp 2,071
Jumlah Rp 5,393
Keuntungan 10% Rp 539
Total = Jumlah+(Keuntungan 10%) Rp 5,932
1 M' Pengadaan & Pemasangan KABEL Sealded 2 x 0,75 mm Rp 6,000
Kabel Sealded 2 x 0,75 mm M' 1.000 Rp -
Kabel skun, Vilnyl, dll set 1.000 Rp -
Mandor hari 0.007 Rp 155,000.00 Rp 1,107
Kepala Tukang hari 0.014 Rp 155,000.00 Rp 2,214
Tukang hari 0.014 Rp 145,000.00 Rp 2,071
Jumlah Rp 5,393
Keuntungan 10% Rp 539
Total = Jumlah+(Keuntungan 10%) Rp 5,932

1 M' Pengadaan & Pemasangan KABEL TR, NYM 3 x 2,5 mm2 Rp 28,000
Kabel NYM 3 x 2,5 mm2 M' 1.000 Rp 19,000.00 Rp 19,000
Kabel skun, Vilnyl, dll set 1.000 Rp 950.00 Rp 950
Mandor hari 0.007 Rp 155,000.00 Rp 1,107
Kepala Tukang hari 0.014 Rp 155,000.00 Rp 2,214
Tukang hari 0.014 Rp 145,000.00 Rp 2,071
Jumlah Rp 25,343
Keuntungan 10% Rp 2,534
Total = Jumlah+(Keuntungan 10%) Rp 27,877
1 M' Pengadaan & Pemasangan KABEL TR, NYM 3 x 2,5 mm2 + konduit Rp 44,000
Kabel NYM 3 x 2,5 mm2 M' 1.000 Rp 19,000.00 Rp 19,000
Pipa konduit M' 1.000 Rp 15,000.00 Rp 15,000
Kabel skun, Vilnyl, dll set 1.000 Rp 475.00 Rp 475
Mandor hari 0.007 Rp 155,000.00 Rp 1,107
Kepala Tukang hari 0.014 Rp 155,000.00 Rp 2,214
Tukang hari 0.014 Rp 145,000.00 Rp 2,071
Jumlah Rp 39,868
Keuntungan 10% Rp 3,987
Total = Jumlah+(Keuntungan 10%) Rp 43,855

1 M' Pengadaan & Pemasangan KABEL TR, NYY 4 X 2,5 mm2 Rp 37,000
Kabel NYY 4 x 2,5 mm2 M' 1.000 Rp 26,720.00 Rp 26,720
Kabel skun, Vilnyl, dll set 1.000 Rp 1,336.00 Rp 1,336
Mandor hari 0.007 Rp 155,000.00 Rp 1,107
Kepala Tukang hari 0.014 Rp 155,000.00 Rp 2,214
Tukang hari 0.014 Rp 145,000.00 Rp 2,071
Jumlah Rp 33,449
Keuntungan 10% Rp 3,345
Total = Jumlah+(Keuntungan 10%) Rp 36,794

1 M' Pengadaan & Pemasangan KABEL TR, NYY 4 X 4 mm2 Rp 53,000


Kabel NYY 4x4 mm2 M' 1.000 Rp 40,460.00 Rp 40,460
Kabel skun, Vilnyl, dll set 1.000 Rp 2,023.00 Rp 2,023
Mandor hari 0.007 Rp 155,000.00 Rp 1,107
Kepala Tukang hari 0.014 Rp 155,000.00 Rp 2,214
Tukang hari 0.014 Rp 145,000.00 Rp 2,071
Jumlah Rp 47,876
Keuntungan 10% Rp 4,788
Total = Jumlah+(Keuntungan 10%) Rp 52,663

1 M' Pengadaan & Pemasangan KABEL TR, NYY 4 X 4 mm2 + BCC 4 mm Rp 62,000
Kabel NYY 4x4 mm2 M' 1.000 Rp 40,460.00 Rp 40,460
Kabel BCC 4 m M' 1.000 Rp 8,500.00 Rp 8,500
Kabel skun, Vilnyl, dll set 1.000 Rp 2,448.00 Rp 2,448
Mandor hari 0.007 Rp 155,000.00 Rp 1,107
Kepala Tukang hari 0.014 Rp 155,000.00 Rp 2,214
Tukang hari 0.014 Rp 145,000.00 Rp 2,071
Jumlah Rp 56,801
Keuntungan 10% Rp 5,680
Total = Jumlah+(Keuntungan 10%) Rp 62,481

1 M' Pengadaan & Pemasangan KABEL TR, NYY 4 X 6 mm2 Rp 71,000


Kabel NYY 4x6 mm2 M' 1.000 Rp 56,670.00 Rp 56,670
Analisa Harga Satuan Pekerjaan MEP - page 199 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Kabel skun, Vilnyl, dll set 1.000 Rp 2,833.50 Rp 2,834
Mandor hari 0.007 Rp 155,000.00 Rp 1,107
Kepala Tukang hari 0.014 Rp 155,000.00 Rp 2,214
Tukang hari 0.014 Rp 145,000.00 Rp 2,071
Jumlah Rp 64,896
Keuntungan 10% Rp 6,490
Total = Jumlah+(Keuntungan 10%) Rp 71,386

1 M' Pengadaan & Pemasangan KABEL TR, NYY 4 X 6 mm2 + BC 4 mm Rp 90,000


Kabel NYY 4x6 mm2 M' 1.000 Rp 56,670.00 Rp 56,670
Kabel BCC 4 mm2 M' 1.000 Rp 8,500.00 Rp 8,500
Kabel skun, Vilnyl, dll set 1.000 Rp 11,333.50 Rp 11,334
Mandor hari 0.007 Rp 155,000.00 Rp 1,107
Kepala Tukang hari 0.014 Rp 155,000.00 Rp 2,214
Tukang hari 0.014 Rp 145,000.00 Rp 2,071
Jumlah Rp 81,896
Keuntungan 10% Rp 8,190
Total = Jumlah+(Keuntungan 10%) Rp 90,086

1 M' Pengadaan & Pemasangan KABEL TR, NYY 4 X 10 mm2 Rp 108,000


Kabel NYY 4x10 mm2 M' 1.000 Rp 90,400.00 Rp 90,400
BCC 6 mm M' Rp -
Kabel skun, Vilnyl, dll set 1.000 Rp 2,260.00 Rp 2,260
Mandor hari 0.007 Rp 155,000.00 Rp 1,107
Kepala Tukang hari 0.014 Rp 155,000.00 Rp 2,214
Tukang hari 0.014 Rp 145,000.00 Rp 2,071
Jumlah Rp 98,053
Keuntungan 10% Rp 9,805
Total = Jumlah+(Keuntungan 10%) Rp 107,858

1 M' Pengadaan & Pemasangan KABEL TR, NYY 4 X 16 mm2 + BC 10 mm Rp 192,000


Kabel NYY 4x16 mm2 M' 1.000 Rp 148,200.00 Rp 148,200
BC 10 mm M' 1.000 Rp 16,800.00 Rp 16,800
Kabel skun, Vilnyl, dll set 1.000 Rp 3,705.00 Rp 3,705
Mandor hari 0.007 Rp 155,000.00 Rp 1,107
Kepala Tukang hari 0.014 Rp 155,000.00 Rp 2,214
Tukang hari 0.014 Rp 145,000.00 Rp 2,071
Jumlah Rp 174,098
Keuntungan 10% Rp 17,410
Total = Jumlah+(Keuntungan 10%) Rp 191,508

1 M' Pengadaan & Pemasangan KABEL TR, NYY 4 X 25 mm2 Rp 266,000


Kabel NYY 4x25 mm2 M' 1.000 Rp 228,000.00 Rp 228,000
BC 16 mm M' Rp -
Kabel skun, Vilnyl, dll set 1.000 Rp 5,700.00 Rp 5,700
Mandor hari 0.011 Rp 155,000.00 Rp 1,661
Kepala Tukang hari 0.021 Rp 155,000.00 Rp 3,321
Tukang hari 0.021 Rp 145,000.00 Rp 3,107
Jumlah Rp 241,789
Keuntungan 10% Rp 24,179
Total = Jumlah+(Keuntungan 10%) Rp 265,968

1 M' Pengadaan & Pemasangan KABEL TR, NYY 4 X 35 mm2 Rp 368,000


Kabel NYY 4x35 mm2 M' 1.000 Rp 310,500.00 Rp 310,500
BC 25 mm M' Rp -
Kabel skun, Vilnyl, dll set 1.000 Rp 15,525.00 Rp 15,525
Mandor hari 0.011 Rp 155,000.00 Rp 1,661
Kepala Tukang hari 0.021 Rp 155,000.00 Rp 3,321
Tukang hari 0.021 Rp 145,000.00 Rp 3,107
Jumlah Rp 334,114
Keuntungan 10% Rp 33,411
Total = Jumlah+(Keuntungan 10%) Rp 367,526

1 M' Pengadaan & Pemasangan KABEL TR, NYY 4 X 50 mm2 Rp 474,000


Kabel NYY 4x50 mm2 M' 1.000 Rp 412,200.00 Rp 412,200
Kabel skun, Vilnyl, dll set 1.000 Rp 10,305.00 Rp 10,305
Mandor hari 0.011 Rp 155,000.00 Rp 1,661
Kepala Tukang hari 0.021 Rp 155,000.00 Rp 3,321
Tukang hari 0.021 Rp 145,000.00 Rp 3,107
Jumlah Rp 430,594
Keuntungan 10% Rp 43,059
Total = Jumlah+(Keuntungan 10%) Rp 473,654
1 M' Pengadaan & Pemasangan KABEL TR, NYY 3 X 50 mm2 + NYY 4 x 4 mm Rp 398,000
Kabel NYY 3x50 mm2 M' 1.000 Rp 305,700.00 Rp 305,700
Kabel NYY 4x4 mm2 M' 1.000 Rp 40,460.00 Rp 40,460
Kabel skun, Vilnyl, dll set 1.000 Rp 7,642.50 Rp 7,643
Mandor hari 0.011 Rp 155,000.00 Rp 1,661
Kepala Tukang hari 0.021 Rp 155,000.00 Rp 3,321
Tukang hari 0.021 Rp 145,000.00 Rp 3,107
Jumlah Rp 361,892
Keuntungan 10% Rp 36,189
Total = Jumlah+(Keuntungan 10%) Rp 398,081

1 M' Pengadaan & Pemasangan KABEL TR, NYY 3 X 50 mm2 Rp 354,000


Kabel NYY 3x50 mm2 M' 1.000 Rp 305,700.00 Rp 305,700
Kabel skun, Vilnyl, dll set 1.000 Rp 7,642.50 Rp 7,643
Mandor hari 0.011 Rp 155,000.00 Rp 1,661
Kepala Tukang hari 0.021 Rp 155,000.00 Rp 3,321
Analisa Harga Satuan Pekerjaan MEP - page 200 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Tukang hari 0.021 Rp 145,000.00 Rp 3,107
Jumlah Rp 321,432
Keuntungan 10% Rp 32,143
Total = Jumlah+(Keuntungan 10%) Rp 353,575

1 M' Pengadaan & Pemasangan KABEL TR, NYY 3 X 35 mm2 Rp 274,000


Kabel NYY 3x35 mm2 M' 1.000 Rp 235,500.00 Rp 235,500
Kabel skun, Vilnyl, dll set 1.000 Rp 5,887.50 Rp 5,888
Mandor hari 0.011 Rp 155,000.00 Rp 1,661
Kepala Tukang hari 0.021 Rp 155,000.00 Rp 3,321
Tukang hari 0.021 Rp 145,000.00 Rp 3,107
Jumlah Rp 249,477
Keuntungan 10% Rp 24,948
Total = Jumlah+(Keuntungan 10%) Rp 274,424

1 M' Pengadaan & Pemasangan KABEL TR, NYY 4 X 70 mm2 Rp 671,000


Kabel NYY 4x70 mm2 M' 1.000 Rp 584,700.00 Rp 584,700
BC 35 mm M' Rp -
Kabel skun, Vilnyl, dll set 1.000 Rp 14,617.50 Rp 14,618
Mandor hari 0.014 Rp 155,000.00 Rp 2,214
Kepala Tukang hari 0.029 Rp 155,000.00 Rp 4,429
Tukang hari 0.029 Rp 145,000.00 Rp 4,143
Jumlah Rp 610,103
Keuntungan 10% Rp 61,010
Total = Jumlah+(Keuntungan 10%) Rp 671,114

1 M' Pengadaan & Pemasangan KABEL TR, NYY 4 X 95 mm2 Rp 942,000


Kabel NYY 4x95 mm2 M' 1.000 Rp 805,200.00 Rp 805,200
Kabel skun, Vilnyl, dll set 1.000 Rp 40,260.00 Rp 40,260
Mandor hari 0.014 Rp 155,000.00 Rp 2,214
Kepala Tukang hari 0.029 Rp 155,000.00 Rp 4,429
Tukang hari 0.029 Rp 145,000.00 Rp 4,143
Jumlah Rp 856,246
Keuntungan 10% Rp 85,625
Total = Jumlah+(Keuntungan 10%) Rp 941,870

1 M' Pengadaan & Pemasangan KABEL TR, NYY 4 X 120 mm2 Rp 1,156,000
Kabel NYY 4x120 mm2 M' 1.000 Rp 1,011,900.00 Rp 1,011,900
Kabel skun, Vilnyl, dll set 1.000 Rp 25,297.50 Rp 25,298
Mandor hari 0.018 Rp 155,000.00 Rp 2,768
Kepala Tukang hari 0.036 Rp 155,000.00 Rp 5,536
Tukang hari 0.036 Rp 145,000.00 Rp 5,179
Jumlah Rp 1,050,680
Keuntungan 10% Rp 105,068
Total = Jumlah+(Keuntungan 10%) Rp 1,155,748
1 M' Pengadaan & Pemasangan KABEL TR, NYY 4 X 150 mm2 Rp 1,453,000
Kabel NYY 4x150 mm2 M' 1.000 Rp 1,245,000.00 Rp 1,245,000
Kabel skun, Vilnyl, dll set 1.000 Rp 62,250.00 Rp 62,250
Mandor hari 0.018 Rp 155,000.00 Rp 2,768
Kepala Tukang hari 0.036 Rp 155,000.00 Rp 5,536
Tukang hari 0.036 Rp 145,000.00 Rp 5,179
Jumlah Rp 1,320,732
Keuntungan 10% Rp 132,073
Total = Jumlah+(Keuntungan 10%) Rp 1,452,805
1 M' Pengadaan & Pemasangan KABEL TR, NYY 4 X 150 mm2 + BC 50 mm Rp 1,506,000
Kabel NYY 4x150 mm2 M' 1.000 Rp 1,245,000.00 Rp 1,245,000
BC 50 mm M' 1.000 Rp 79,800.00 Rp 79,800
Kabel skun, Vilnyl, dll set 1.000 Rp 31,125.00 Rp 31,125
Mandor hari 0.018 Rp 155,000.00 Rp 2,768
Kepala Tukang hari 0.036 Rp 155,000.00 Rp 5,536
Tukang hari 0.036 Rp 145,000.00 Rp 5,179
Jumlah Rp 1,369,407
Keuntungan 10% Rp 136,941
Total = Jumlah+(Keuntungan 10%) Rp 1,506,348
1 M' Pengadaan & Pemasangan KABEL TR, NYY 4 X 185 mm2 Rp 1,766,000
Kabel NYY 4x185 mm2 M' 1.000 Rp 1,552,800.00 Rp 1,552,800
Kabel skun, Vilnyl, dll set 1.000 Rp 38,820.00 Rp 38,820
Mandor hari 0.018 Rp 155,000.00 Rp 2,768
Kepala Tukang hari 0.036 Rp 155,000.00 Rp 5,536
Tukang hari 0.036 Rp 145,000.00 Rp 5,179
Jumlah Rp 1,605,102
Keuntungan 10% Rp 160,510
Total = Jumlah+(Keuntungan 10%) Rp 1,765,612
1 M' Pengadaan & Pemasangan KABEL TR, NYY 4 X 185 mm2 + BC 50 mm Rp 1,853,000
Kabel NYY 4x185 mm2 M' 1.000 Rp 1,552,800.00 Rp 1,552,800
BC 50 mm M' 1.000 Rp 79,800.00 Rp 79,800
Kabel skun, Vilnyl, dll set 1.000 Rp 38,820.00 Rp 38,820
Mandor hari 0.018 Rp 155,000.00 Rp 2,768
Kepala Tukang hari 0.036 Rp 155,000.00 Rp 5,536
Tukang hari 0.036 Rp 145,000.00 Rp 5,179
Jumlah Rp 1,684,902
Keuntungan 10% Rp 168,490
Total = Jumlah+(Keuntungan 10%) Rp 1,853,392

1 M' Pengadaan & Pemasangan KABEL TR, NYY 4 X 1 X 185 MM2 Rp 1,802,000
Kabel NYY 1 x 185 mm2 M' 4.000 Rp 377,100.00 Rp 1,508,400
Kabel skun, Vilnyl, dll set 1.000 Rp 75,420.00 Rp 75,420
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Analisa Harga Satuan Pekerjaan MEP - page 201 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Kepala Tukang hari 0.143 Rp 155,000.00 Rp 22,143
Tukang hari 0.143 Rp 145,000.00 Rp 20,714
Jumlah Rp 1,637,749
Keuntungan 10% Rp 163,775
Total = Jumlah+(Keuntungan 10%) Rp 1,801,523

1 M' Pengadaan & Pemasangan KABEL TR, NYY 4 ( 1 X 240 MM2) Rp 2,348,000
Kabel NYY 1 x 240 mm2 M' 4.000 Rp 495,300.00 Rp 1,981,200
Kabel skun, Vilnyl, dll set 1.000 Rp 99,060.00 Rp 99,060
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.143 Rp 155,000.00 Rp 22,143
Tukang hari 0.143 Rp 145,000.00 Rp 20,714
Jumlah Rp 2,134,189
Keuntungan 10% Rp 213,419
Total = Jumlah+(Keuntungan 10%) Rp 2,347,607

1 M' Pengadaan & Pemasangan KABEL TR, NYY 4 ( 3 x 1c X 240 mm2) Rp 6,773,000
Kabel NYY 1 x 240 mm2 M' 12.000 Rp 495,300.00 Rp 5,943,600
Kabel skun, Vilnyl, dll set 1.000 Rp 148,590.00 Rp 148,590
Mandor hari 0.086 Rp 155,000.00 Rp 13,286
Kepala Tukang hari 0.171 Rp 155,000.00 Rp 26,571
Tukang hari 0.171 Rp 145,000.00 Rp 24,857
Jumlah Rp 6,156,904
Keuntungan 10% Rp 615,690
Total = Jumlah+(Keuntungan 10%) Rp 6,772,595

1 M' Pengadaan & Pemasangan KABEL TR, NYY 3 x 4 ( 1 X 300 mm2 ) Rp 8,470,000
Kabel NYY 1x300 mm2 M' 12.000 Rp 618,900.00 Rp 7,426,800
Kabel skun, Vilnyl, dll set 1.000 Rp 111,402.00 Rp 111,402
Mandor hari 0.214 Rp 155,000.00 Rp 33,214
Kepala Tukang hari 0.429 Rp 155,000.00 Rp 66,429
Tukang hari 0.429 Rp 145,000.00 Rp 62,143
Jumlah Rp 7,699,988
Keuntungan 10% Rp 769,999
Total = Jumlah+(Keuntungan 10%) Rp 8,469,986

1 M' Pengadaan & Pemasangan KABEL TR, NYY 5 x 4 ( 1 X 300 mm2 ) Rp 13,998,000
Kabel NYY 1x300 mm2 M' 20.000 Rp 618,900.00 Rp 12,378,000
Kabel skun, Vilnyl, dll set 1.000 Rp 185,670.00 Rp 185,670
Mandor hari 0.214 Rp 155,000.00 Rp 33,214
Kepala Tukang hari 0.429 Rp 155,000.00 Rp 66,429
Tukang hari 0.429 Rp 145,000.00 Rp 62,143
Jumlah Rp 12,725,456
Keuntungan 10% Rp 1,272,546
Total = Jumlah+(Keuntungan 10%) Rp 13,998,001

1 M' Pengadaan & Pemasangan KABEL TR, NYY 2 x 4 ( 1 X 150 mm2 ) Rp 2,881,681
Kabel NYY 1x150 mm2 M' 8.000 Rp 302,700.00 Rp 2,421,600
Kabel skun, Vilnyl, dll set 1.000 Rp 36,324.00 Rp 36,324
Mandor hari 0.214 Rp 155,000.00 Rp 33,214
Kepala Tukang hari 0.429 Rp 155,000.00 Rp 66,429
Tukang hari 0.429 Rp 145,000.00 Rp 62,143
Jumlah Rp 2,619,710
Keuntungan 10% Rp 261,971
Total = Jumlah+(Keuntungan 10%) Rp 2,881,681

1 Roll Pengadaan & Pemasangan KABEL TR, NYY 2 x 2,5 ( 1 X 150 mm2 ) Rp 141,429
Kabel NYY 1x150 mm2 Roll 1.000 Rp -
Kabel skun, Vilnyl, dll set 1.000 Rp -
Mandor hari 0.214 Rp -
Kepala Tukang hari 0.429 Rp 155,000.00 Rp 66,429
Tukang hari 0.429 Rp 145,000.00 Rp 62,143
Jumlah Rp 128,571
Keuntungan 10% Rp 12,857
Total = Jumlah+(Keuntungan 10%) Rp 141,429

1 M' Pengadaan & Pemasangan KABEL TR, FRC 2 x ( 4 x 185 mm2 ) Rp 4,597,000
Kabel FRC 4 x 185 mm2 M' 2.000 Rp 1,995,000.00 Rp 3,990,000
Kabel skun, Vilnyl, dll set 1.000 Rp 59,850.00 Rp 59,850
Mandor hari 0.171 Rp 155,000.00 Rp 26,571
Kepala Tukang hari 0.343 Rp 155,000.00 Rp 53,143
Tukang hari 0.343 Rp 145,000.00 Rp 49,714
Jumlah Rp 4,179,279
Keuntungan 10% Rp 417,928
Total = Jumlah+(Keuntungan 10%) Rp 4,597,206

1 M' Pengadaan & Pemasangan KABEL TR, FRC 4 x 1 x 185 mm2 Rp 2,287,000
Kabel FRC 4 x 185 mm2 M' 1.000 Rp 1,995,000.00 Rp 1,995,000
Kabel skun, Vilnyl, dll set 1.000 Rp 29,925.00 Rp 29,925
Mandor hari 0.071 Rp 155,000.00 Rp 11,071
Kepala Tukang hari 0.143 Rp 155,000.00 Rp 22,143
Tukang hari 0.143 Rp 145,000.00 Rp 20,714
Jumlah Rp 2,078,854
Keuntungan 10% Rp 207,885
Total = Jumlah+(Keuntungan 10%) Rp 2,286,739

1 M' Pengadaan & Pemasangan KABEL TR, FRC 4 X 150 mm2 Rp 1,935,000
Analisa Harga Satuan Pekerjaan MEP - page 202 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Kabel FRC 4 x 150 mm2 M' 1.000 Rp 1,662,500.00 Rp 1,662,500
Kabel skun, Vilnyl, dll set 1.000 Rp 83,125.00 Rp 83,125
Mandor hari 0.018 Rp 155,000.00 Rp 2,768
Kepala Tukang hari 0.036 Rp 155,000.00 Rp 5,536
Tukang hari 0.036 Rp 145,000.00 Rp 5,179
Jumlah Rp 1,759,107
Keuntungan 10% Rp 175,911
Total = Jumlah+(Keuntungan 10%) Rp 1,935,018

1 M' Pengadaan & Pemasangan KABEL TR, FRC 4 X 120 mm2 Rp 1,661,000
Kabel FRC 4 x 120 mm2 M' 1.000 Rp 1,425,000.00 Rp 1,425,000
Kabel skun, Vilnyl, dll set 1.000 Rp 71,250.00 Rp 71,250
Mandor hari 0.018 Rp 155,000.00 Rp 2,768
Kepala Tukang hari 0.036 Rp 155,000.00 Rp 5,536
Tukang hari 0.036 Rp 145,000.00 Rp 5,179
Jumlah Rp 1,509,732
Keuntungan 10% Rp 150,973
Total = Jumlah+(Keuntungan 10%) Rp 1,660,705

1 M' Pengadaan & Pemasangan KABEL TR, FRC 4 X 50 mm2 Rp 572,000


Kabel FRC 4 x 50 mm2 M' 1.000 Rp 487,464.00 Rp 487,464
Kabel skun, Vilnyl, dll set 1.000 Rp 24,373.20 Rp 24,373
Mandor hari 0.011 Rp 155,000.00 Rp 1,661
Kepala Tukang hari 0.021 Rp 155,000.00 Rp 3,321
Tukang hari 0.021 Rp 145,000.00 Rp 3,107
Jumlah Rp 519,926
Keuntungan 10% Rp 51,993
Total = Jumlah+(Keuntungan 10%) Rp 571,919

1 M' Pengadaan & Pemasangan KABEL TR, FRC 4 X 35 mm2 Rp 471,000


Kabel FRC 4 x 35 mm2 M' 1.000 Rp 399,684.00 Rp 399,684
Kabel skun, Vilnyl, dll set 1.000 Rp 19,984.20 Rp 19,984
Mandor hari 0.011 Rp 155,000.00 Rp 1,661
Kepala Tukang hari 0.021 Rp 155,000.00 Rp 3,321
Tukang hari 0.021 Rp 145,000.00 Rp 3,107
Jumlah Rp 427,757
Keuntungan 10% Rp 42,776
Total = Jumlah+(Keuntungan 10%) Rp 470,533

1 M' Pengadaan & Pemasangan KABEL TR, FRC 4 X 25 mm2 Rp 327,000


Kabel FRC 4 x 25 mm2 M' 1.000 Rp 275,500.00 Rp 275,500
Kabel skun, Vilnyl, dll set 1.000 Rp 13,775.00 Rp 13,775
Mandor hari 0.011 Rp 155,000.00 Rp 1,661
Kepala Tukang hari 0.021 Rp 155,000.00 Rp 3,321
Tukang hari 0.021 Rp 145,000.00 Rp 3,107
Jumlah Rp 297,364
Keuntungan 10% Rp 29,736
Total = Jumlah+(Keuntungan 10%) Rp 327,101

1 M' Pengadaan & Pemasangan KABEL TR, FRC 4 X 4 mm2 Rp 89,000


Kabel FRC 4 x 4mm2 M' 1.000 Rp 71,820.00 Rp 71,820
Kabel skun, Vilnyl, dll set 1.000 Rp 3,591.00 Rp 3,591
Mandor hari 0.007 Rp 155,000.00 Rp 1,107
Kepala Tukang hari 0.014 Rp 155,000.00 Rp 2,214
Tukang hari 0.014 Rp 145,000.00 Rp 2,071
Jumlah Rp 80,804
Keuntungan 10% Rp 8,080
Total = Jumlah+(Keuntungan 10%) Rp 88,884
1 M' Pengadaan & Pemasangan KABEL TR, FRC 4 X 10 mm2 + BC 6 mm Rp 173,000
Kabel FRC 4 x 10 mm2 M' 1.000 Rp 138,510.00 Rp 138,510
BC 6 mm M' 1.000 Rp 10,100.00 Rp 10,100
Kabel skun, Vilnyl, dll set 1.000 Rp 3,462.75 Rp 3,463
Mandor hari 0.007 Rp 155,000.00 Rp 1,107
Kepala Tukang hari 0.014 Rp 155,000.00 Rp 2,214
Tukang hari 0.014 Rp 145,000.00 Rp 2,071
Jumlah Rp 157,466
Keuntungan 10% Rp 15,747
Total = Jumlah+(Keuntungan 10%) Rp 173,212
1 M' Pengadaan & Pemasangan KABEL TR, FRC 4 X 1c x 10 mm2 Rp 6,000
Kabel FRC 1 x 10 mm2 M' 4.000 Rp -
Kabel skun, Vilnyl, dll set 1.000 Rp -
Mandor hari 0.007 Rp 155,000.00 Rp 1,107
Kepala Tukang hari 0.014 Rp 155,000.00 Rp 2,214
Tukang hari 0.014 Rp 145,000.00 Rp 2,071
Jumlah Rp 5,393
Keuntungan 10% Rp 539
Total = Jumlah+(Keuntungan 10%) Rp 5,932
1 M' Pengadaan & Pemasangan KABEL TR, NYFGbY 4 x 25 mm2 Rp 359,000
Kabel NYFGbY 4 x 25 mm2 M' 1.000 Rp 261,250.00 Rp 261,250
Kabel skun, Vilnyl, dll set 1.000 Rp 6,531.25 Rp 6,531
Galian, urugan & pelindung kabel M' 1.000 Rp 45,000.00 Rp 45,000
Mandor hari 0.018 Rp 155,000.00 Rp 2,768
Kepala Tukang hari 0.036 Rp 155,000.00 Rp 5,536
Tukang hari 0.036 Rp 145,000.00 Rp 5,179
Jumlah Rp 326,263
Keuntungan 10% Rp 32,626
Total = Jumlah+(Keuntungan 10%) Rp 358,890

Analisa Harga Satuan Pekerjaan MEP - page 203 of 215


NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
1 M' Pengadaan & Pemasangan KABEL TR, NYFGbY 4 x 50 mm2 Rp 1,510,000
Kabel NYFGbY 4 x 50 mm2 M' 1.000 Rp 1,282,500.00 Rp 1,282,500
Kabel skun, Vilnyl, dll set 1.000 Rp 32,062.50 Rp 32,063
Galian, urugan & pelindung kabel M' 1.000 Rp 45,000.00 Rp 45,000
Mandor hari 0.018 Rp 155,000.00 Rp 2,768
Kepala Tukang hari 0.036 Rp 155,000.00 Rp 5,536
Tukang hari 0.036 Rp 145,000.00 Rp 5,179
Jumlah Rp 1,373,045
Keuntungan 10% Rp 137,304
Total = Jumlah+(Keuntungan 10%) Rp 1,510,349
1 M' Pengadaan & Pemasangan KABEL TR, NYFGbY 4 x 10 mm2 Rp 623,000
Kabel NYFGbY 4 x 10 mm2 M' 1.000 Rp 495,300.00 Rp 495,300
Kabel skun, Vilnyl, dll set 1.000 Rp 12,382.50 Rp 12,383
Galian, urugan & pelindung kabel M' 1.000 Rp 45,000.00 Rp 45,000
Mandor hari 0.018 Rp 155,000.00 Rp 2,768
Kepala Tukang hari 0.036 Rp 155,000.00 Rp 5,536
Tukang hari 0.036 Rp 145,000.00 Rp 5,179
Jumlah Rp 566,165
Keuntungan 10% Rp 56,616
Total = Jumlah+(Keuntungan 10%) Rp 622,781
1 M' Pengadaan & Pemasangan KABEL TR, NYFGbY 4 x 150 mm2 Rp 1,513,000
Kabel NYY 4 x 150 mm2 M' 1.000 Rp 1,282,500.00 Rp 1,282,500
Kabel skun, Vilnyl, dll set 1.000 Rp 32,062.50 Rp 32,063
Galian, urugan & pelindung kabel M' 1.000 Rp 45,000.00 Rp 45,000
Mandor hari 0.021 Rp 155,000.00 Rp 3,321
Kepala Tukang hari 0.043 Rp 155,000.00 Rp 6,643
Tukang hari 0.043 Rp 145,000.00 Rp 6,214
Jumlah Rp 1,375,741
Keuntungan 10% Rp 137,574
Total = Jumlah+(Keuntungan 10%) Rp 1,513,315

1 M' Pengadaan & Pemasangan KABEL TR, NYFGbY 4 x 185 mm2 Rp 1,888,000
Kabel NYY 4 x 185 mm2 M' 1.000 Rp 1,615,000.00 Rp 1,615,000
Kabel skun, Vilnyl, dll set 1.000 Rp 40,375.00 Rp 40,375
Galian, urugan & pelindung kabel M' 1.000 Rp 45,000.00 Rp 45,000
Mandor hari 0.021 Rp 155,000.00 Rp 3,321
Kepala Tukang hari 0.043 Rp 155,000.00 Rp 6,643
Tukang hari 0.043 Rp 145,000.00 Rp 6,214
Jumlah Rp 1,716,554
Keuntungan 10% Rp 171,655
Total = Jumlah+(Keuntungan 10%) Rp 1,888,209

1 M' Pengadaan & Pemasangan KABEL TR, NYFGbY 3 (4 x 300 mm2 ) Rp 8,671,000
Kabel NYY 4 x 300 mm2 M' 3.000 Rp 2,565,000.00 Rp 7,695,000
Kabel skun, Vilnyl, dll set 1.000 Rp 115,425.00 Rp 115,425
Galian, urugan & pelindung kabel M' 1.000 Rp 45,000.00 Rp 45,000
Mandor hari 0.036 Rp 155,000.00 Rp 5,536
Kepala Tukang hari 0.071 Rp 155,000.00 Rp 11,071
Tukang hari 0.071 Rp 145,000.00 Rp 10,357
Jumlah Rp 7,882,389
Keuntungan 10% Rp 788,239
Total = Jumlah+(Keuntungan 10%) Rp 8,670,628

1 M' Pengadaan & Pemasangan KABEL TR, NYA 1 x 50 mm2 Rp 358,000


Kabel NYA 1 x 50 mm2 M' 1.000 Rp 301,800.00 Rp 301,800
Kabel skun, Vilnyl, dll set 1.000 Rp 7,545.00 Rp 7,545
Mandor hari 0.021 Rp 155,000.00 Rp 3,321
Kepala Tukang hari 0.043 Rp 155,000.00 Rp 6,643
Tukang hari 0.043 Rp 145,000.00 Rp 6,214
Jumlah Rp 325,524
Keuntungan 10% Rp 32,552
Total = Jumlah+(Keuntungan 10%) Rp 358,076

1 M' Pengadaan & Pemasangan KABEL TR, NYA 1 x 16 mm2 Rp 56,000


Kabel NYA 1 x 16 mm2 M' 1.000 Rp 34,200.00 Rp 34,200
Kabel skun, Vilnyl, dll set 1.000 Rp 855.00 Rp 855
Mandor hari 0.021 Rp 155,000.00 Rp 3,321
Kepala Tukang hari 0.043 Rp 155,000.00 Rp 6,643
Tukang hari 0.043 Rp 145,000.00 Rp 6,214
Jumlah Rp 51,234
Keuntungan 10% Rp 5,123
Total = Jumlah+(Keuntungan 10%) Rp 56,357

1 M' Pengadaan & Pemasangan KABEL TR, NYA 1 x 6 mm2 Rp 31,000


Kabel NYA 1 x 6 mm2 M' 1.000 Rp 11,420.00 Rp 11,420
Kabel skun, Vilnyl, dll set 1.000 Rp 285.50 Rp 286
Mandor hari 0.021 Rp 155,000.00 Rp 3,321
Kepala Tukang hari 0.043 Rp 155,000.00 Rp 6,643
Tukang hari 0.043 Rp 145,000.00 Rp 6,214
Jumlah Rp 27,884
Keuntungan 10% Rp 2,788
Total = Jumlah+(Keuntungan 10%) Rp 30,672

1 M' Pengadaan & Pemasangan KABEL TRAY LEBAR 20 CM Rp 399,000


Kabel Tray lebar 20 cm (200 -100) M' 1.000 Rp 275,000.00 Rp 275,000
Kelengkapan ( Elbow, Tee, Cross, Redd, penggantung/dudukan ) Lot 1.000 Rp 41,250.00 Rp 41,250
Mandor hari 0.058 Rp 155,000.00 Rp 9,042
Analisa Harga Satuan Pekerjaan MEP - page 204 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Kepala Tukang hari 0.125 Rp 155,000.00 Rp 19,375
Tukang hari 0.125 Rp 145,000.00 Rp 18,125
Jumlah Rp 362,792
Keuntungan 10% Rp 36,279
Total = Jumlah+(Keuntungan 10%) Rp 399,071

1 M' Pengadaan & Pemasangan KABEL TRAY LEBAR 30 CM Rp 589,000


Kabel Tray lebar 30 cm (300 -100) M' 1.000 Rp 425,000.00 Rp 425,000
Kelengkapan ( Elbow, Tee, Cross, Redd, penggantung/dudukan ) Lot 1.000 Rp 63,750.00 Rp 63,750
Mandor hari 0.058 Rp 155,000.00 Rp 9,042
Kepala Tukang hari 0.125 Rp 155,000.00 Rp 19,375
Tukang hari 0.125 Rp 145,000.00 Rp 18,125
Jumlah Rp 535,292
Keuntungan 10% Rp 53,529
Total = Jumlah+(Keuntungan 10%) Rp 588,821

1 M' Pengadaan & Pemasangan KABEL TRAY LEBAR 40 CM Rp 694,000


Kabel Tray lebar 40 cm (400 -100) M' 1.000 Rp 508,000.00 Rp 508,000
Kelengkapan ( Elbow, Tee, Cross, Redd, penggantung/dudukan ) Lot 1.000 Rp 76,200.00 Rp 76,200
Mandor hari 0.058 Rp 155,000.00 Rp 9,042
Kepala Tukang hari 0.125 Rp 155,000.00 Rp 19,375
Tukang hari 0.125 Rp 145,000.00 Rp 18,125
Jumlah Rp 630,742
Keuntungan 10% Rp 63,074
Total = Jumlah+(Keuntungan 10%) Rp 693,816

1 M' Pengadaan & Pemasangan KABEL TRAY LEBAR 60 CM Rp 772,000


Kabel Tray lebar 60 cm (600 -100) M' 1.000 Rp 570,000.00 Rp 570,000
Kelengkapan ( Elbow, Tee, Cross, Redd, penggantung/dudukan ) Lot 1.000 Rp 85,500.00 Rp 85,500
Mandor hari 0.058 Rp 155,000.00 Rp 9,042
Kepala Tukang hari 0.125 Rp 155,000.00 Rp 19,375
Tukang hari 0.125 Rp 145,000.00 Rp 18,125
Jumlah Rp 702,042
Keuntungan 10% Rp 70,204
Total = Jumlah+(Keuntungan 10%) Rp 772,246

1 M' Pengadaan & Pemasangan CU Bars 5 x 25 mm Rp 1,754,000


CU Bars 5 x 25 mm M' 1.000 Rp 1,425,000.00 Rp 1,425,000
sambungan ls 1.000 Rp 142,500.00 Rp 142,500
Mandor hari 0.036 Rp 155,000.00 Rp 5,536
Kepala Tukang hari 0.071 Rp 155,000.00 Rp 11,071
Tukang hari 0.071 Rp 145,000.00 Rp 10,357
Jumlah Rp 1,594,464
Keuntungan 10% Rp 159,446
Total = Jumlah+(Keuntungan 10%) Rp 1,753,911
1 M' Pengadaan & Pemasangan Kabel BC 95 mm Rp 219,000
Kabel BC 95 mm2 M' 1.000 Rp 156,700.00 Rp 156,700
sambungan ls 1.000 Rp 15,670.00 Rp 15,670
Mandor hari 0.036 Rp 155,000.00 Rp 5,536
Kepala Tukang hari 0.071 Rp 155,000.00 Rp 11,071
Tukang hari 0.071 Rp 145,000.00 Rp 10,357
Jumlah Rp 199,334
Keuntungan 10% Rp 19,933
Total = Jumlah+(Keuntungan 10%) Rp 219,268
1 M' Pengadaan & Pemasangan Kabel Grounding BC 55 mm + konduit 1 " Rp 211,000
Kabel BC 95 mm2 M' 1.000 Rp 156,700.00 Rp 156,700
Kondut dia. 1 " M' 1.000 Rp -
sambungan ls 1.000 Rp 7,835.00 Rp 7,835
Mandor hari 0.036 Rp 155,000.00 Rp 5,536
Kepala Tukang hari 0.071 Rp 155,000.00 Rp 11,071
Tukang hari 0.071 Rp 145,000.00 Rp 10,357
Jumlah Rp 191,499
Keuntungan 10% Rp 19,150
Total = Jumlah+(Keuntungan 10%) Rp 210,649

1 M' Pengadaan & Pemasangan Trench Kabel ( 600 x 600 x 120) Rp 30,000
Trech kabel Pasangan Beton mertulang + tutup m3 0.130 Rp -
Mandor hari 0.036 Rp 155,000.00 Rp 5,536
Kepala Tukang hari 0.071 Rp 155,000.00 Rp 11,071
Tukang hari 0.071 Rp 145,000.00 Rp 10,357
Jumlah Rp 26,964
Keuntungan 10% Rp 2,696
Total = Jumlah+(Keuntungan 10%) Rp 29,661

1 BH Pengadaan & Pemasangan LAMPU LED Panel 120/60 W A.4.6.2.11. Modifikasi Rp 1,130,000
Lampu LED Panel Sparc 120/60 W bh 1.000 Rp 1,020,000.00 Rp 1,020,000
Mandor hari 0.010 Rp 155,000.00 Rp 1,550
Kepala Tukang hari 0.020 Rp 155,000.00 Rp 3,100
Tukang hari 0.020 Rp 145,000.00 Rp 2,900
Jumlah Rp 1,027,550
Keuntungan 10% Rp 102,755
Total = Jumlah+(Keuntungan 10%) Rp 1,130,305

1 BH Pengadaan & Pemasangan LAMPU LED Panel 60/40 W A.4.6.2.11. Modifikasi Rp 266,000
Lampu LED Panel Sparc 60/40 W bh 1.000 Rp 234,000.00 Rp 234,000
Mandor hari 0.010 Rp 155,000.00 Rp 1,550
Kepala Tukang hari 0.020 Rp 155,000.00 Rp 3,100
Tukang hari 0.020 Rp 145,000.00 Rp 2,900
Analisa Harga Satuan Pekerjaan MEP - page 205 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Jumlah Rp 241,550
Keuntungan 10% Rp 24,155
Total = Jumlah+(Keuntungan 10%) Rp 265,705

1 BH Pengadaan & Pemasangan LAMPU TL LED 1X16 W - TKI A.4.6.2.11. Modifikasi Rp 216,000
Lampu TL LED 1x16 W/TKI bh 1.000 Rp 188,400.00 Rp 188,400
Mandor hari 0.010 Rp 155,000.00 Rp 1,550
Kepala Tukang hari 0.020 Rp 155,000.00 Rp 3,100
Tukang hari 0.020 Rp 145,000.00 Rp 2,900
Jumlah Rp 195,950
Keuntungan 10% Rp 19,595
Total = Jumlah+(Keuntungan 10%) Rp 215,545

1 BH Pengadaan & Pemasangan LAMPU TL 1X16 W - DustproofA.4.6.2.11. Modifikasi Rp 253,000


Lampu TL 1X16 W/ Dustproof bh 1.000 Rp 222,000.00 Rp 222,000
Mandor hari 0.010 Rp 155,000.00 Rp 1,550
Kepala Tukang hari 0.020 Rp 155,000.00 Rp 3,100
Tukang hari 0.020 Rp 145,000.00 Rp 2,900
Jumlah Rp 229,550
Keuntungan 10% Rp 22,955
Total = Jumlah+(Keuntungan 10%) Rp 252,505

1 BH Pengadaan & Pemasangan LAMPU TL LED 1X 8 W / Cove A.4.6.2.11.


Wastafel Modifikasi Rp 206,000
Lampu TL LED 1x8 W/ Cove Wastafel bh 1.000 Rp 180,000.00 Rp 180,000
Mandor hari 0.010 Rp 155,000.00 Rp 1,550
Kepala Tukang hari 0.020 Rp 155,000.00 Rp 3,100
Tukang hari 0.020 Rp 145,000.00 Rp 2,900
Jumlah Rp 187,550
Keuntungan 10% Rp 18,755
Total = Jumlah+(Keuntungan 10%) Rp 206,305
1 BH Pengadaan & Pemasangan LAMPU TL LED 1X 16 W c/w Battere
A.4.6.2.11. Modifikasi Rp 338,000
Lampu TL LED 16W / TBS Menempel pada plat beton+ Battere bh 1.000 Rp 300,000.00 Rp 300,000
Mandor hari 0.010 Rp 155,000.00 Rp 1,550
Kepala Tukang hari 0.020 Rp 155,000.00 Rp 3,100
Tukang hari 0.020 Rp 145,000.00 Rp 2,900
Jumlah Rp 307,550
Keuntungan 10% Rp 30,755
Total = Jumlah+(Keuntungan 10%) Rp 338,305

1 BH Pengadaan & Pemasangan LAMPU TL LED 1X 8 W / RMO A.4.6.2.11. Modifikasi Rp 239,000


Lampu TL LED 1x8 W/ Cove (RMO) bh 1.000 Rp 210,000.00 Rp 210,000
Mandor hari 0.010 Rp 155,000.00 Rp 1,550
Kepala Tukang hari 0.020 Rp 155,000.00 Rp 3,100
Tukang hari 0.020 Rp 145,000.00 Rp 2,900
Jumlah Rp 217,550
Keuntungan 10% Rp 21,755
Total = Jumlah+(Keuntungan 10%) Rp 239,305

1 BH Pengadaan & Pemasangan LAMPU DOWN LIGHT LED 6 WA.4.6.2.11. Modifikasi Rp 140,000
Lampu Down Light LED 6 W bh 1.000 Rp 120,000.00 Rp 120,000
Mandor hari 0.010 Rp 155,000.00 Rp 1,550
Kepala Tukang hari 0.020 Rp 155,000.00 Rp 3,100
Tukang hari 0.020 Rp 145,000.00 Rp 2,900
Jumlah Rp 127,550
Keuntungan 10% Rp 12,755
Total = Jumlah+(Keuntungan 10%) Rp 140,305

1 BH Pengadaan & Pemasangan LAMPU DOWN LIGHT LED 12 A.4.6.2.11.


W Modifikasi Rp 173,000
Lampu Down Light LED 1 x 12 W bh 1.000 Rp 150,000.00 Rp 150,000
Battere Emergency bh Rp 120,000.00 Rp -
Mandor hari 0.010 Rp 155,000.00 Rp 1,550
Kepala Tukang hari 0.020 Rp 155,000.00 Rp 3,100
Tukang hari 0.020 Rp 145,000.00 Rp 2,900
Jumlah Rp 157,550
Keuntungan 10% Rp 15,755
Total = Jumlah+(Keuntungan 10%) Rp 173,305
1 BH Pengadaan & Pemasangan LAMPU DOWN LIGHT SPOT LED
A.4.6.2.11.
15 W Modifikasi Rp 266,000
Lampu Down Light Spot LED 15 W bh 1.000 Rp 234,000.00 Rp 234,000
Mandor hari 0.010 Rp 155,000.00 Rp 1,550
Kepala Tukang hari 0.020 Rp 155,000.00 Rp 3,100
Tukang hari 0.020 Rp 145,000.00 Rp 2,900
Jumlah Rp 241,550
Keuntungan 10% Rp 24,155
Total = Jumlah+(Keuntungan 10%) Rp 265,705
1 BH Pengadaan & Pemasangan LAMPU LED Stripe 3 W / M A.4.6.2.11. Modifikasi Rp 121,000
Lampu LED Stripe 3 W / M bh 1.000 Rp 102,000.00 Rp 102,000
Mandor hari 0.010 Rp 155,000.00 Rp 1,550
Kepala Tukang hari 0.020 Rp 155,000.00 Rp 3,100
Tukang hari 0.020 Rp 145,000.00 Rp 2,900
Jumlah Rp 109,550
Keuntungan 10% Rp 10,955
Total = Jumlah+(Keuntungan 10%) Rp 120,505
1 BH Pengadaan & Pemasangan LAMPU DINDING LED 5 W + SAKLAR
A.4.6.2.11. Modifikasi Rp 338,000
Lampu Dinding LED 5 W + Saklar bh 1.000 Rp 300,000.00 Rp 300,000
Mandor hari 0.010 Rp 155,000.00 Rp 1,550
Kepala Tukang hari 0.020 Rp 155,000.00 Rp 3,100
Tukang hari 0.020 Rp 145,000.00 Rp 2,900
Jumlah Rp 307,550
Analisa Harga Satuan Pekerjaan MEP - page 206 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Keuntungan 10% Rp 30,755
Total = Jumlah+(Keuntungan 10%) Rp 338,305

1 BH Pengadaan & Pemasangan LAMPU SOROT 25 W A.4.6.2.11. Modifikasi Rp 1,988,000


Lampu Dl Sorot 25 W bh 1.000 Rp 1,800,000.00 Rp 1,800,000
Mandor hari 0.010 Rp 155,000.00 Rp 1,550
Kepala Tukang hari 0.020 Rp 155,000.00 Rp 3,100
Tukang hari 0.020 Rp 145,000.00 Rp 2,900
Jumlah Rp 1,807,550
Keuntungan 10% Rp 180,755
Total = Jumlah+(Keuntungan 10%) Rp 1,988,305

1 BH Pengadaan & Pemasangan LAMPU JALAN LED 1 X 300 W + TIANG 7 METER Rp 5,247,000
Lampu Jalan PJU 1 x 300 Watt Solar Panel lengkap tiang bh 1.000 Rp 4,500,000.00 Rp 4,500,000
Mandor hari 0.357 Rp 155,000.00 Rp 55,357
Kepala Tukang hari 0.714 Rp 155,000.00 Rp 110,714
Tukang hari 0.714 Rp 145,000.00 Rp 103,571
Jumlah Rp 4,769,643
Keuntungan 10% Rp 476,964
Total = Jumlah+(Keuntungan 10%) Rp 5,246,607

1 BH Pengadaan & Pemasangan LAMPU JALAN LED 2 X 300 W + TIANG 7 METER Rp 6,237,000
Lampu Jalan PJU 2 x 300 Watt Solar Panel lengkap tiang bh 1.000 Rp 5,400,000.00 Rp 5,400,000
Mandor hari 0.357 Rp 155,000.00 Rp 55,357
Kepala Tukang hari 0.714 Rp 155,000.00 Rp 110,714
Tukang hari 0.714 Rp 145,000.00 Rp 103,571
Jumlah Rp 5,669,643
Keuntungan 10% Rp 566,964
Total = Jumlah+(Keuntungan 10%) Rp 6,236,607

1 BH Pengadaan & Pemasangan LAMPU Taman 18 W + TIANG Rp 4,191,000


Lampu Taman LED 18 Watt + tiang bh 1.000 Rp 3,540,000.00 Rp 3,540,000
Mandor hari 0.357 Rp 155,000.00 Rp 55,357
Kepala Tukang hari 0.714 Rp 155,000.00 Rp 110,714
Tukang hari 0.714 Rp 145,000.00 Rp 103,571
Jumlah Rp 3,809,643
Keuntungan 10% Rp 380,964
Total = Jumlah+(Keuntungan 10%) Rp 4,190,607

1 M' Pengadaan & Pemasangan LAMPU EXIT + BATTERE Rp 226,000


Lampu Exit + Battere bh 1.000 Rp 180,000.00 Rp 180,000
Mandor hari 0.033 Rp 155,000.00 Rp 5,167
Kepala Tukang hari 0.067 Rp 155,000.00 Rp 10,333
Tukang hari 0.067 Rp 145,000.00 Rp 9,667
Jumlah Rp 205,167
Keuntungan 10% Rp 20,517
Total = Jumlah+(Keuntungan 10%) Rp 225,683

1 BH Pengadaan & Pemasangan SAKLAR TUNGGAL Rp 55,000


Saklar tunggal 10 A bh 1.000 Rp 50,000.00 Rp 50,000
Mandor hari - Rp 155,000.00 Rp -
Kepala Tukang hari - Rp 155,000.00 Rp -
Tukang hari - Rp 145,000.00 Rp -
Jumlah Rp 50,000
Keuntungan 10% Rp 5,000
Total = Jumlah+(Keuntungan 10%) Rp 55,000

1 BH Pengadaan & Pemasangan SAKLAR GANDA Rp 72,000


Saklar ganda 10 A bh 1.000 Rp 65,000.00 Rp 65,000
Mandor hari - Rp 155,000.00 Rp -
Kepala Tukang hari - Rp 155,000.00 Rp -
Tukang hari - Rp 145,000.00 Rp -
Jumlah Rp 65,000
Keuntungan 10% Rp 6,500
Total = Jumlah+(Keuntungan 10%) Rp 71,500

1 BH Pengadaan & Pemasangan SAKLAR TUKAR Rp 88,000


Saklar tukar bh 1.000 Rp 80,000.00 Rp 80,000
Mandor hari - Rp 155,000.00 Rp -
Kepala Tukang hari - Rp 155,000.00 Rp -
Tukang hari - Rp 145,000.00 Rp -
Jumlah Rp 80,000
Keuntungan 10% Rp 8,000
Total = Jumlah+(Keuntungan 10%) Rp 88,000

1 BH PEMASANGN SAKLAR GROUP 6 MODUL Rp 83,000


Saklar group 6 modul bh 1.000 Rp 75,000.00 Rp 75,000
Mandor hari - Rp 155,000.00 Rp -
Kepala Tukang hari - Rp 155,000.00 Rp -
Tukang hari - Rp 145,000.00 Rp -
Jumlah Rp 75,000
Keuntungan 10% Rp 7,500
Total = Jumlah+(Keuntungan 10%) Rp 82,500

1 BH Pengadaan & Pemasangan STOP KONTAK DAYA / 1 Phase Rp 83,000


Stop kontak daya 10/16 A bh 1.000 Rp 75,000.00 Rp 75,000
Mandor hari - Rp 155,000.00 Rp -
Analisa Harga Satuan Pekerjaan MEP - page 207 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Kepala Tukang hari - Rp 155,000.00 Rp -
Tukang hari - Rp 145,000.00 Rp -
Jumlah Rp 75,000
Keuntungan 10% Rp 7,500
Total = Jumlah+(Keuntungan 10%) Rp 82,500
1 BH Pengadaan & Pemasangan STOP KONTAK DAYA / 1 Phase 2 x 16A Rp 61,000
Stop kontak daya 2 x 10/16 A bh 1.000 Rp 55,000.00 Rp 55,000
Mandor hari - Rp 155,000.00 Rp -
Kepala Tukang hari - Rp 155,000.00 Rp -
Tukang hari - Rp 145,000.00 Rp -
Jumlah Rp 55,000
Keuntungan 10% Rp 5,500
Total = Jumlah+(Keuntungan 10%) Rp 60,500
1 BH Pengadaan & Pemasangan STOP KONTAK DAYA / 1 Phase 3 x 16A Rp 72,000
Stop kontak daya 3 x 10/16 A bh 1.000 Rp 65,000.00 Rp 65,000
Mandor hari - Rp 155,000.00 Rp -
Kepala Tukang hari - Rp 155,000.00 Rp -
Tukang hari - Rp 145,000.00 Rp -
Jumlah Rp 65,000
Keuntungan 10% Rp 6,500
Total = Jumlah+(Keuntungan 10%) Rp 71,500
1 BH Pengadaan & Pemasangan STOP KONTAK DAYA / 1 Phase 4 x 16A Rp 94,000
Stop kontak daya 4 x 10/16 A bh 1.000 Rp 85,000.00 Rp 85,000
Mandor hari - Rp 155,000.00 Rp -
Kepala Tukang hari - Rp 155,000.00 Rp -
Tukang hari - Rp 145,000.00 Rp -
Jumlah Rp 85,000
Keuntungan 10% Rp 8,500
Total = Jumlah+(Keuntungan 10%) Rp 93,500
1 BH Pengadaan & Pemasangan STOP KONTAK DAYA / 1 Phase 6 x 16A Rp 121,000
Stop kontak daya 6 x 10/16 A bh 1.000 Rp 110,000.00 Rp 110,000
Mandor hari - Rp 155,000.00 Rp -
Kepala Tukang hari - Rp 155,000.00 Rp -
Tukang hari - Rp 145,000.00 Rp -
Jumlah Rp 110,000
Keuntungan 10% Rp 11,000
Total = Jumlah+(Keuntungan 10%) Rp 121,000

1 BH Pengadaan & Pemasangan STOP KONTAK DAYA / 3 Phase Rp 127,000


Stop kontak daya 10/16 A/3 Phase bh 1.000 Rp 115,000.00 Rp 115,000
Mandor hari - Rp 155,000.00 Rp -
Kepala Tukang hari - Rp 155,000.00 Rp -
Tukang hari - Rp 145,000.00 Rp -
Jumlah Rp 115,000
Keuntungan 10% Rp 11,500
Total = Jumlah+(Keuntungan 10%) Rp 126,500
1 BH Pengadaan & Pemasangan STOP KONTAK LANTAI 2 X @ 200 W Rp 825,000
Stop kontak lantai 2 x @ 200 W / 1 Phase bh 1.000 Rp 750,000.00 Rp 750,000
Mandor hari - Rp 155,000.00 Rp -
Kepala Tukang hari - Rp 155,000.00 Rp -
Tukang hari - Rp 145,000.00 Rp -
Jumlah Rp 750,000
Keuntungan 10% Rp 75,000
Total = Jumlah+(Keuntungan 10%) Rp 825,000
1 BH Pengadaan & Pemasangan BOX FLOOR OUTLET Rp 880,000
Box Floor Outlet bh 1.000 Rp 800,000.00 Rp 800,000
Mandor hari - Rp 155,000.00 Rp -
Kepala Tukang hari - Rp 155,000.00 Rp -
Tukang hari - Rp 145,000.00 Rp -
Jumlah Rp 800,000
Keuntungan 10% Rp 80,000
Total = Jumlah+(Keuntungan 10%) Rp 880,000
1 BH Pengadaan & Pemasangan EMERGENCY KIT LAMP Rp 132,000
Emergency Kit Lamp bh 1.000 Rp 120,000.00 Rp 120,000
Mandor hari - Rp 155,000.00 Rp -
Kepala Tukang hari - Rp 155,000.00 Rp -
Tukang hari - Rp 145,000.00 Rp -
Jumlah Rp 120,000
Keuntungan 10% Rp 12,000
Total = Jumlah+(Keuntungan 10%) Rp 132,000

1 TTK TITIK INSTALASI PENERANGAN Rp 310,000


Kabel NYM 2x1,5 mm2 M' 8.000 Rp 10,500.00 Rp 84,000
Pipa Conduit Batang 3.000 Rp 15,000.00 Rp 45,000
Socket Pipa bh 1.000 Rp 3,500.00 Rp 3,500
Tee Doos bh 2.000 Rp 7,500.00 Rp 15,000
Klem Pipa bh 3.000 Rp 1,500.00 Rp 4,500
Fhiser bh 6.000 Rp 500.00 Rp 3,000
Las Doop bh 2.000 Rp 5,000.00 Rp 10,000
Isolasi ban bh 0.250 Rp 3,000.00 Rp 750
Mandor hari 0.167 Rp 155,000.00 Rp 25,833
Kepala Tukang hari 0.300 Rp 155,000.00 Rp 46,500
Tukang hari 0.300 Rp 145,000.00 Rp 43,500
Jumlah Rp 281,583
Keuntungan 10% Rp 28,158
Total = Jumlah+(Keuntungan 10%) Rp 309,742

1 TTK TITIK INSTALASI PENERANGAN LAMPU LUAR Rp 1,167,000


Analisa Harga Satuan Pekerjaan MEP - page 208 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Kabel NYY 4x4 mm2 M' 20.000 Rp 40,460.00 Rp 809,200
Kabel, NYY 3 x 2,5 mm2 M' 4.000 Rp 23,000.00 Rp 92,000
Galian & Urugan M' 20.000 Rp -
Mandor hari 0.250 Rp 155,000.00 Rp 38,750
Kepala Tukang hari 0.500 Rp 155,000.00 Rp 77,500
Tukang hari 0.300 Rp 145,000.00 Rp 43,500
Jumlah Rp 1,060,950
Keuntungan 10% Rp 106,095
Total = Jumlah+(Keuntungan 10%) Rp 1,167,045

1 TTK TITIK INSTALASI STOP KONTAK 1 PHASAE Rp 458,000


Kabel NYM 3x2,5 mm2 M' 10.000 Rp 19,000.00 Rp 190,000
Pipa Conduit Batang 3.000 Rp 15,000.00 Rp 45,000
Socket Pipa bh 1.000 Rp 3,500.00 Rp 3,500
Tee Doos bh 2.000 Rp 7,500.00 Rp 15,000
Klem Pipa bh 3.000 Rp 1,500.00 Rp 4,500
Fhiser bh 6.000 Rp 500.00 Rp 3,000
Las Doop bh 2.000 Rp 5,000.00 Rp 10,000
Isolasi ban bh 0.250 Rp 3,000.00 Rp 750
Mandor hari - Rp 155,000.00 Rp -
Kepala Tukang hari - Rp 155,000.00 Rp -
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Jumlah Rp 416,750
Keuntungan 10% Rp 41,675
Total = Jumlah+(Keuntungan 10%) Rp 458,425

1 TTK TITIK INSTALASI STOP KONTAK 3 PHASA Rp 662,000


Kabel NYY 4 x 4 mm2 M' 10.000 Rp 40,460.00 Rp 404,600
Pipa Conduit Batang 3.000 Rp 15,000.00 Rp 45,000
Socket Pipa bh 1.000 Rp 3,500.00 Rp 3,500
Tee Doos bh 2.000 Rp 7,500.00 Rp 15,000
Klem Pipa bh 3.000 Rp 1,500.00 Rp 4,500
Fhiser bh 6.000 Rp 500.00 Rp 3,000
Las Doop bh 2.000 Rp 5,000.00 Rp 10,000
Isolasi ban bh 0.250 Rp 3,000.00 Rp 750
Mandor hari 0.167 Rp 155,000.00 Rp 25,833
Kepala Tukang hari 0.300 Rp 155,000.00 Rp 46,500
Tukang hari 0.300 Rp 145,000.00 Rp 43,500
Jumlah Rp 602,183
Keuntungan 10% Rp 60,218
Total = Jumlah+(Keuntungan 10%) Rp 662,402

1 TTK TITIK INSTALASI POMPA BOOSTER Rp 1,351,000


Kabel NYY 4 x4 mm2 M' 25.000 Rp 40,460.00 Rp 1,011,500
Alat bantu ls 1.000 Rp 101,150.00 Rp 101,150
Mandor hari 0.167 Rp 155,000.00 Rp 25,833
Kepala Tukang hari 0.300 Rp 155,000.00 Rp 46,500
Tukang hari 0.300 Rp 145,000.00 Rp 43,500
Jumlah Rp 1,228,483
Keuntungan 10% Rp 122,848
Total = Jumlah+(Keuntungan 10%) Rp 1,351,332

1 TTK TITIK INSTALASI POMPA AIR BERSIH Rp 936,000


Kabel NYY 4 x 2,5 mm2 M' 25.000 Rp 26,720.00 Rp 668,000
Alat bantu ls 1.000 Rp 66,800.00 Rp 66,800
Mandor hari 0.167 Rp 155,000.00 Rp 25,833
Kepala Tukang hari 0.300 Rp 155,000.00 Rp 46,500
Tukang hari 0.300 Rp 145,000.00 Rp 43,500
Jumlah Rp 850,633
Keuntungan 10% Rp 85,063
Total = Jumlah+(Keuntungan 10%) Rp 935,697

1 TTK TITIK INSTALASI OUTDOOR UNIT AC GF Rp 4,610,000


Kabel NYY 4 x 16 mm2 M' 25.000 Rp 148,200.00 Rp 3,705,000
Alat bantu ls 1.000 Rp 370,500.00 Rp 370,500
Mandor hari 0.167 Rp 155,000.00 Rp 25,833
Kepala Tukang hari 0.300 Rp 155,000.00 Rp 46,500
Tukang hari 0.300 Rp 145,000.00 Rp 43,500
Jumlah Rp 4,191,333
Keuntungan 10% Rp 419,133
Total = Jumlah+(Keuntungan 10%) Rp 4,610,467

1 TTK TITIK INSTALASI OUTDOOR UNIT AC -1 Rp 7,024,000


Kabel NYY 4 x 25 mm2 M' 25.000 Rp 228,000.00 Rp 5,700,000
Alat bantu ls 1.000 Rp 570,000.00 Rp 570,000
Mandor hari 0.167 Rp 155,000.00 Rp 25,833
Kepala Tukang hari 0.300 Rp 155,000.00 Rp 46,500
Tukang hari 0.300 Rp 145,000.00 Rp 43,500
Jumlah Rp 6,385,833
Keuntungan 10% Rp 638,583
Total = Jumlah+(Keuntungan 10%) Rp 7,024,417

1 TTK TITIK INSTALASI SAC SPLIT CASSETE Rp 587,000


Kabel NYM 3 x 2.5 mm2 M' 20.000 Rp 19,000.00 Rp 380,000
Alat bantu ls 1.000 Rp 38,000.00 Rp 38,000
Mandor hari 0.167 Rp 155,000.00 Rp 25,833
Kepala Tukang hari 0.300 Rp 155,000.00 Rp 46,500
Tukang hari 0.300 Rp 145,000.00 Rp 43,500
Analisa Harga Satuan Pekerjaan MEP - page 209 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Jumlah Rp 533,833
Keuntungan 10% Rp 53,383
Total = Jumlah+(Keuntungan 10%) Rp 587,217

1 TTK TITIK INSTALASI SAC SPLIT WALL Rp 587,000


Kabel NYm 3 x 2,5 mm2 M' 20.000 Rp 19,000.00 Rp 380,000
Alat bantu ls 1.000 Rp 38,000.00 Rp 38,000
Mandor hari 0.167 Rp 155,000.00 Rp 25,833
Kepala Tukang hari 0.300 Rp 155,000.00 Rp 46,500
Tukang hari 0.300 Rp 145,000.00 Rp 43,500
Jumlah Rp 533,833
Keuntungan 10% Rp 53,383
Total = Jumlah+(Keuntungan 10%) Rp 587,217

1 TTK TITIK INSTALASI EXHAUST FAN Rp 472,000


Kabel NYY 3 x 2,5 mm2 M' 15.000 Rp 19,000.00 Rp 285,000
Alat bantu ls 1.000 Rp 28,500.00 Rp 28,500
Mandor hari 0.167 Rp 155,000.00 Rp 25,833
Kepala Tukang hari 0.300 Rp 155,000.00 Rp 46,500
Tukang hari 0.300 Rp 145,000.00 Rp 43,500
Jumlah Rp 429,333
Keuntungan 10% Rp 42,933
Total = Jumlah+(Keuntungan 10%) Rp 472,267

1 TTK TITIK INSTALASI EWH Rp 504,000


Kabel NYM 3 x 2,5 mm2 M' 18.000 Rp 19,000.00 Rp 342,000
Mandor hari 0.167 Rp 155,000.00 Rp 25,833
Kepala Tukang hari 0.300 Rp 155,000.00 Rp 46,500
Tukang hari 0.300 Rp 145,000.00 Rp 43,500
Jumlah Rp 457,833
Keuntungan 10% Rp 45,783
Total = Jumlah+(Keuntungan 10%) Rp 503,617
PEKERJAAN GENSET
1 unit PENGADAAN & PEMASANGAN GENSET KAP, 1000 KVA Rp 1,331,000
Genset ( Silent ) kapasitas : 1000 kVA bh 1.000 Rp - Rp -
Alat Bantu Lainnya unit 1.000 Rp - Rp -
Mandor hari 2.000 Rp 155,000.00 Rp 310,000
Kepala Tukang hari 3.000 Rp 155,000.00 Rp 465,000
Tukang hari 3.000 Rp 145,000.00 Rp 435,000
Jumlah Rp 1,210,000
Keuntungan 10% Rp 121,000
Total = Jumlah+(Keuntungan 10%) Rp 1,331,000
1 unit PENGADAAN & PEMASANGAN PANEL KONTROL GENSET ( AMF ) Rp 1,331,000
Panel Kontrol Genset ( AMF ) bh 1.000 Rp - Rp -
Alat Bantu Lainnya unit 1.000 Rp - Rp -
Mandor hari 2.000 Rp 155,000.00 Rp 310,000
Kepala Tukang hari 3.000 Rp 155,000.00 Rp 465,000
Tukang hari 3.000 Rp 145,000.00 Rp 435,000
Jumlah Rp 1,210,000
Keuntungan 10% Rp 121,000
Total = Jumlah+(Keuntungan 10%) Rp 1,331,000
1 unit PENGADAAN & PEMASANGAN PANEL KONTROL GENSET ( AMF ) Rp 1,331,000
Panel Kontrol Genset ( AMF ) bh 1.000 Rp - Rp -
Alat Bantu Lainnya unit 1.000 Rp - Rp -
Mandor hari 2.000 Rp 155,000.00 Rp 310,000
Kepala Tukang hari 3.000 Rp 155,000.00 Rp 465,000
Tukang hari 3.000 Rp 145,000.00 Rp 435,000
Jumlah Rp 1,210,000
Keuntungan 10% Rp 121,000
Total = Jumlah+(Keuntungan 10%) Rp 1,331,000
1 unit PENGADAAN & PEMASANGAN BAHAN BAKAR 15000 LITER Rp 666,000
Storage Tank 15 000 Liter bh 1.000 Rp - Rp -
Alat Bantu Lainnya unit 1.000 Rp - Rp -
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 1.500 Rp 155,000.00 Rp 232,500
Tukang hari 1.500 Rp 145,000.00 Rp 217,500
Jumlah Rp 605,000
Keuntungan 10% Rp 60,500
Total = Jumlah+(Keuntungan 10%) Rp 665,500
1 unit PENGADAAN & PEMASANGAN BAHAN BAKAR 500 LITER Rp 333,000
Storage Tank 500 Liter bh 1.000 Rp - Rp -
Alat Bantu Lainnya unit 1.000 Rp - Rp -
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Kepala Tukang hari 0.750 Rp 155,000.00 Rp 116,250
Tukang hari 0.750 Rp 145,000.00 Rp 108,750
Jumlah Rp 302,500
Keuntungan 10% Rp 30,250
Total = Jumlah+(Keuntungan 10%) Rp 332,750
1 unit PENGADAAN & PEMASANGAN ELECTRIC GEAR PUMP Rp 666,000
Electric Gear Pump bh 1.000 Rp - Rp -
Alat Bantu Lainnya unit 1.000 Rp - Rp -
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 1.500 Rp 155,000.00 Rp 232,500
Tukang hari 1.500 Rp 145,000.00 Rp 217,500
Jumlah Rp 605,000
Keuntungan 10% Rp 60,500
Total = Jumlah+(Keuntungan 10%) Rp 665,500
1 unit PENGADAAN & PEMASANGAN POMPA TANGAN Rp 119,000
Analisa Harga Satuan Pekerjaan MEP - page 210 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Hand Pump ls 1.000 Rp - Rp -
Alat Bantu Lainnya unit 1.000 Rp - Rp -
Mandor hari 0.143 Rp 155,000.00 Rp 22,143
Kepala Tukang hari 0.286 Rp 155,000.00 Rp 44,286
Tukang hari 0.286 Rp 145,000.00 Rp 41,429
Jumlah Rp 107,857
Keuntungan 10% Rp 10,786
Total = Jumlah+(Keuntungan 10%) Rp 118,643
1 unit PENGADAAN & PEMASANGAN PEMIPAAN BAHAN BAKAR Rp 356,000
Pipa BSP Sch.40 ls 1.000 Rp -
Valve - Valve ls 1.000 Rp -
Alat Bantu Lainnya ls 1.000 Rp -
Mandor hari 0.429 Rp 155,000.00 Rp 66,429
Kepala Tukang hari 0.857 Rp 155,000.00 Rp 132,857
Tukang hari 0.857 Rp 145,000.00 Rp 124,286
Jumlah Rp 323,571
Keuntungan 10% Rp 32,357
Total = Jumlah+(Keuntungan 10%) Rp 355,929
1 unit PENGADAAN & PEMASANGAN PANEL KONTROL ELECTRIC & WIRING Rp 262,000
Panel & Wiring ls 1.000 Rp -
Alat Bantu Lainnya ls 1.000 Rp -
Mandor hari 0.429 Rp 155,000.00 Rp 66,429
Kepala Tukang hari 0.571 Rp 155,000.00 Rp 88,571
Tukang hari 0.571 Rp 145,000.00 Rp 82,857
Jumlah Rp 237,857
Keuntungan 10% Rp 23,786
Total = Jumlah+(Keuntungan 10%) Rp 261,643
1 unit PENGADAAN & PEMASANGAN EXHAUST ATTENUATOR Rp 831,000
Exhaust Attenuator ls 1.000 Rp - Rp -
Alat Bantu Lainnya ls 1.000 Rp - Rp -
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 755,000
Keuntungan 10% Rp 75,500
Total = Jumlah+(Keuntungan 10%) Rp 830,500
1 unit PENGADAAN & PEMASANGAN INTAKE ATTENUATOR Rp 831,000
Intake Attenuator ls 1.000 Rp - Rp -
Alat Bantu Lainnya ls 1.000 Rp - Rp -
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Kepala Tukang hari 2.000 Rp 155,000.00 Rp 310,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Jumlah Rp 755,000
Keuntungan 10% Rp 75,500
Total = Jumlah+(Keuntungan 10%) Rp 830,500
1 unit PENGADAAN & PEMASANGAN KABEL POWER NYY 4 (3 x 1c x 240 mm2) Rp 6,909,000
NYY 1 x 240 mm2 m' 12.000 Rp 495,300.00 Rp 5,943,600
Alat Bantu Lainnya ls 1.000 Rp 297,180.00 Rp 297,180
Mandor hari 0.054 Rp 155,000.00 Rp 8,304
Kepala Tukang hari 0.107 Rp 155,000.00 Rp 16,607
Tukang hari 0.107 Rp 145,000.00 Rp 15,536
Jumlah Rp 6,281,226
Keuntungan 10% Rp 628,123
Total = Jumlah+(Keuntungan 10%) Rp 6,909,349
1 unit PENGADAAN & PEMASANGAN KABEL CEROBONG ASAP Rp 237,000
Cerobong Asap bh 1.000 Rp - Rp -
Alat Bantu Lainnya ls 1.000 Rp - Rp -
Mandor hari 0.286 Rp 155,000.00 Rp 44,286
Kepala Tukang hari 0.571 Rp 155,000.00 Rp 88,571
Tukang hari 0.571 Rp 145,000.00 Rp 82,857
Jumlah Rp 215,714
Keuntungan 10% Rp 21,571
Total = Jumlah+(Keuntungan 10%) Rp 237,286
PEKERJAAN PNEUMATIC TUBE

1 SET Pengadaan & Pemasangan Central Control Unit Dual Line System and Power Supply Unit Rp 87,456,000
Central Control Unit Dual Line System and Power Supply Unit set 1.000 Rp 75,000,000.00 Rp 75,000,000
Alat bantu & penunjang Ls 1.000 Rp 3,750,000.00 Rp 3,750,000
Tukang hari 2.000 Rp 145,000.00 Rp 290,000
Kepala tukang hari 2.000 Rp 155,000.00 Rp 310,000
Mandor hari 1.000 Rp 155,000.00 Rp 155,000
Jumlah Rp 79,505,000
Keuntungan 10% Rp 7,950,500
Total = Jumlah+(Keuntungan 10%) Rp 87,455,500

1 SET Pengadaan & Pemasangan Blower, Include Accessories Rp 326,818,000


Blower, Include Accessories set 1.000 Rp 282,600,000.00 Rp 282,600,000
Blower 3-Phase
Blower Connecting Set
Blower Mounting Buffer
Blower Sound Absorber
Blower Controller
Air/Transfer Diverter
Bypass
Hose Clamp 50-70
Air Hose
Air Lid
Air Bow
Analisa Harga Satuan Pekerjaan MEP - page 211 of 215
NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Reduction Air Diverter
Connecting Tube
Transfer Bend
Alat bantu & penunjang Ls 1.000 Rp 14,130,000.00 Rp 14,130,000
Tukang hari 1.000 Rp 145,000.00 Rp 145,000
Kepala tukang hari 1.000 Rp 155,000.00 Rp 155,000
Mandor hari 0.500 Rp 155,000.00 Rp 77,500
Jumlah Rp 297,107,500
Keuntungan 10% Rp 29,710,750
Total = Jumlah+(Keuntungan 10%) Rp 326,818,250

1 SET Pengadaan & Pemasangan PC-Monitoring and Programing System RFID, 2-Line System Rp 22,079,000
PC-Monitoring and Programing System RFID, 2-Line System set 1.000 Rp 19,500,000.00 Rp 19,500,000
Alat bantu & penunjang Ls 1.000 Rp 487,500.00 Rp 487,500
Tukang hari 0.500 Rp 145,000.00 Rp 72,500
Kepala tukang hari 0.050 Rp 155,000.00 Rp 7,750
Mandor hari 0.025 Rp 155,000.00 Rp 3,875
Jumlah Rp 20,071,625
Keuntungan 10% Rp 2,007,163
Total = Jumlah+(Keuntungan 10%) Rp 22,078,788

1 UNIT Pengadaan & Pemasangan 3 - Way Diverter Rp 40,006,000


3 - Way Diverter bh 1.000 Rp 35,400,000.00 Rp 35,400,000
Alat bantu & penunjang Ls 1.000 Rp 885,000.00 Rp 885,000
Tukang hari 0.500 Rp 145,000.00 Rp 72,500
Kepala tukang hari 0.050 Rp 155,000.00 Rp 7,750
Mandor hari 0.025 Rp 155,000.00 Rp 3,875
Jumlah Rp 36,369,125
Keuntungan 10% Rp 3,636,913
Total = Jumlah+(Keuntungan 10%) Rp 40,006,038

1 UNIT Pengadaan & Pemasangan Multy Loading Station, incl. : Basket, Cushion and carrier rack Rp 77,362,000
Multy Loading Station, incl. : Basket, Cushion and carrier rack bh 1.000 Rp 66,900,000.00 Rp 66,900,000
Alat bantu & penunjang Ls 1.000 Rp 3,345,000.00 Rp 3,345,000
Tukang hari 0.500 Rp 145,000.00 Rp 72,500
Kepala tukang hari 0.050 Rp 155,000.00 Rp 7,750
Mandor hari 0.025 Rp 155,000.00 Rp 3,875
Jumlah Rp 70,329,125
Keuntungan 10% Rp 7,032,913
Total = Jumlah+(Keuntungan 10%) Rp 77,362,038

1 UNIT Pengadaan & Pemasangan Bottom Loading Station Rp 17,418,000


Bottom Loading Station bh 1.000 Rp 15,000,000.00 Rp 15,000,000
Alat bantu & penunjang Ls 1.000 Rp 750,000.00 Rp 750,000
Tukang hari 0.500 Rp 145,000.00 Rp 72,500
Kepala tukang hari 0.050 Rp 155,000.00 Rp 7,750
Mandor hari 0.025 Rp 155,000.00 Rp 3,875
Jumlah Rp 15,834,125
Keuntungan 10% Rp 1,583,413
Total = Jumlah+(Keuntungan 10%) Rp 17,417,538

1 M' Pengadaan & Pemasangan Hard PVC Grey, dia. 110 mm Rp 457,000
Hard PVC Grey, dia. 110 mm Meter 1.000 Rp 300,000.00 Rp 300,000
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 90,000.00 Rp 90,000
Tukang hari 0.067 Rp 145,000.00 Rp 9,667
Kepala tukang hari 0.067 Rp 155,000.00 Rp 10,333
Mandor hari 0.033 Rp 155,000.00 Rp 5,167
Jumlah Rp 415,167
Keuntungan 10% Rp 41,517
Total = Jumlah+(Keuntungan 10%) Rp 456,683

1 M' Pengadaan & Pemasangan Hard PVC transparant, dia. 110 mm Rp 7,321,000
Hard PVC transparant, dia. 110 mm Meter 1.000 Rp 5,100,000.00 Rp 5,100,000
Fiting, sambungan & penunjang lainnya Ls 1.000 Rp 1,530,000.00 Rp 1,530,000
Tukang hari 0.067 Rp 145,000.00 Rp 9,667
Kepala tukang hari 0.067 Rp 155,000.00 Rp 10,333
Mandor hari 0.033 Rp 155,000.00 Rp 5,167
Jumlah Rp 6,655,167
Keuntungan 10% Rp 665,517
Total = Jumlah+(Keuntungan 10%) Rp 7,320,683

1 unit Submersible Pump (POMPA CELUP SATELIT TANAM 1/2 HP 0.5 HP 3" SHIMIZU SP315K 50-55 METER) Rp 5,288,000
set SP315K 50-55
Submersible Pump (POMPA CELUP SATELIT TANAM 1/2 HP 0.5 HP 3" SHIMIZU 1.000METER
Rp ) 3,500,000.00 Rp 3,500,000
Kabel include 30 meter
Control Panel Include
Alat Bantu Lainnya ls 1.000 Rp 175,000.00 Rp 175,000
Mandor hari 1.500 Rp 155,000.00 Rp 232,500
Kepala Tukang hari 3.000 Rp 155,000.00 Rp 465,000
Tukang hari 3.000 Rp 145,000.00 Rp 435,000
Jumlah Rp 4,807,500
Keuntungan 10% Rp 480,750
Total = Jumlah+(Keuntungan 10%) Rp 5,288,250

1 M' Pengeboran Sumur Air tanah Dangkal ∅ 6" Pada tanah keras/Cadas
1.3.1.1.4.b.(a) Rp 420,000
Peralatan
Stang bor,batang bor ∅ 1,25" hari 0.600 Rp -
Mata Bor 6” hari 0.600 Rp -

Analisa Harga Satuan Pekerjaan MEP - page 212 of 215


NO. URAIAN SAT INDEK HARGA SATUAN JUMLAH TOTAL
Pekerja hari 1.800 Rp 145,000.00 Rp 261,000
Juru Bor hari 0.600 Rp 155,000.00 Rp 93,000
Mandor hari 0.180 Rp 155,000.00 Rp 27,900
Jumlah Rp 381,900
Keuntungan 10% Rp 38,190
Total = Jumlah+(Keuntungan 10%) Rp 420,090

1 M' Pemasangan 1 m' Casing Sumur Bor Air Tanah Dangkal ∅ 6" 1.3.1.1.4.e.(a) Rp 436,000
Peralatan :
Stang bor,batang bor ∅ 1,25" hari 0.250 Rp -

Bahan:
Pipa PVC AW 6" m 1.000 Rp 155,000.00 Rp 155,000
Screen m 0.100 Rp 825,000.00 Rp 82,500

Pekerja hari 0.750 Rp 145,000.00 Rp 108,750


Juru Bor hari 0.250 Rp 155,000.00 Rp 38,750
Mandor hari 0.075 Rp 155,000.00 Rp 11,625
Jumlah Rp 396,625
Keuntungan 10% Rp 39,663
Total = Jumlah+(Keuntungan 10%) Rp 436,288

Analisa Harga Satuan Pekerjaan MEP - page 213 of 215


HARGA SATUAN MEKANIKAL DAN ELEKTRIKAL
PEKERJAAN PEMBANGUNAN RUMAH SAKIT REGIONAL
KELAS C KABUPATEN BONE - TAHAP LANJUTAN
TAHUN ANGGARAN 2023

NO. URAIAN HARGA SATUAN


PEKERJAAN PLAMBING
1 1 UNIT Pengadaan & Pemasangan Pompa Booster Kap. 2x150 Lpm / Head : 25 M Rp 62,211,000.00
2 1 UNIT Pengadaan & Pemasangan POMPA TRANSFER AB kap. 150 Lpm/Head.60 Meter Rp 38,368,000.00
3 1 UNIT Pengadaan & Pemasangan POMPA FILTER kap. 150 Lpm Rp 76,483,000.00
4 1 UNIT Pengadaan & Pemasangan TANGKI AIR KAP. 2000 Liter Rp 11,831,000.00
5 1 UNIT Pengadaan & Pemasangan TANGKI AIR KAP. 10 M3 Rp 40,706,000.00
6 1 UNIT Pengadaan & Pemasangan TANGKI AIR KAP. 14 M3 Rp 50,331,000.00
7 1 UNIT Pengadaan & Pemasangan TANGKI AIR KAP. 250 M3 Rp 155,381,000.00
8 1 UNIT Pengadaan & Pemasangan TANGKI AIR KAP. 2000 Liter Rp 11,831,000.00
9 1 UNIT Pengadaan & Pemasangan SAND FILTER, KAP. 300 Lpm Rp 18,156,000.00
10 1 UNIT Pengadaan & Pemasangan CARBON FILTER, KAP. 300 Lpm Rp 18,156,000.00
11 1 UNIT Pengadaan & Pemasangan Electroda Water Level Control Rp 4,458,000.00
12 1 UNIT Pengadaan & Pemasangan FLOATING VALVE DIA. 50 MM Rp 3,303,000.00
13 1 UNIT Pengadaan & Pemasangan WATER LEVEL CONTROL Rp 3,303,000.00
14 1 UNIT Pengadaan & Pemasangan Saringan FOOT VALVE DIA.65 MM Rp 523,000.00
15 1 UNIT Pengadaan & Pemasangan Saringan FOOT VALVE DIA.150 MM Rp 1,104,000.00
16 1 UNIT Pengadaan & Pemasangan FLEXIBLE JOINT DIA.65 MM' Rp 4,450,000.00
17 1 UNIT Pengadaan & Pemasangan FLEXIBLE JOINT DIA.50 MM' Rp 4,161,000.00
18 1 UNIT Pengadaan & Pemasangan FLEXIBLE JOINT DIA.32 MM' Rp 3,006,000.00
19 1 UNIT Pengadaan & Pemasangan CHECK VALVE DIA.65 MM' Rp 1,100,000.00
20 1 UNIT Pengadaan & Pemasangan CHECK VALVE DIA.50 MM' Rp 869,000.00
21 1 UNIT Pengadaan & Pemasangan CHECK VALVE DIA.32 MM' Rp 488,000.00
22 1 UNIT Pengadaan & Pemasangan CHECK VALVE DIA.20 MM' Rp 374,000.00
23 1 set Pengadaan & Pemasangan Presure Gauge + Ball Valve dia, 1.2 " Rp 837,000.00
24 1 bh Pengadaan & Pemasangan Kran Taman Rp 354,000.00
25 1 M' Pengadaan & Pemasangan PIPA POLLYPROPELINE DIA. 1/2" PN-10 Rp 25,000.00
26 1 M' Pengadaan & Pemasangan PIPA POLLYPROPELINE DIA. 3/4" / PN-10 Rp 30,000.00
27 1 M' Pengadaan & Pemasangan PIPA POLLYPROPELINE DIA. 1" / PN - 10 Rp 43,000.00
28 1 M' Pengadaan & Pemasangan PIPA POLLYPROPELINE DIA. 1 1/4" / PN - 10 Rp 63,000.00
29 1 M' Pengadaan & Pemasangan PIPA POLLYPROPELINE DIA. 1 1/2" / PN - 10 Rp 91,000.00
30 1 M' Pengadaan & Pemasangan PIPA POLLYPROPELINE DIA. 2" / PN - 10 Rp 138,000.00
31 1 M' Pengadaan & Pemasangan PIPA POLLYPROPELINE DIA. 2 1/2" / PN - 10 Rp 191,000.00
32 1 M' Pengadaan & Pemasangan PIPA POLLYPROPELINE DIA. 3" / PN - 10 Rp 277,000.00
33 1 M' Pengadaan & Pemasangan PIPA POLLYPROPELINE DIA. 6" / PN - 10 Rp 909,000.00
34 1 BH Pengadaan & Pemasangan GATE VALVE DIA.15 MM /10 Kg Rp 633,000.00
35 1 BH Pengadaan & Pemasangan GATE VALVE DIA.20 MM /10 Kg Rp 853,000.00
36 1 BH Pengadaan & Pemasangan GATE VALVE DIA.25 MM /10 Kg Rp 944,000.00
37 1 BH Pengadaan & Pemasangan GATE VALVE DIA.32 MM /10 Kg Rp 1,329,000.00
38 1 BH Pengadaan & Pemasangan GATE VALVE DIA.40 MM /10 Kg Rp 1,623,000.00
39 1 BH Pengadaan & Pemasangan GATE VALVE DIA.50 MM /10 Kg Rp 1,769,000.00
40 1 BH Pengadaan & Pemasangan GATE VALVE DIA.65 MM /10 Kg Rp 1,934,000.00
41 1 UNIT Pengadaan & Pemasangan STRAINER DIA.32 MM' Rp 800,000.00
42 1 UNIT Pengadaan & Pemasangan STRAINER DIA.50 MM' Rp 1,248,000.00
43 1 UNIT Pengadaan & Pemasangan STRAINER DIA.65 MM' Rp 1,484,000.00
44 1 BH Pengadaan & Pemasangan Panel kontrol Pompa AB Rp 14,034,000.00
PEKERJAAN AIR PANAS
1 1 UNIT Pengadaan & Pemasangan Heat Pump Rp 3,880,000.00
2 1 UNIT Pengadaan & Pemasangan Pompa Heat Pump Rp 4,458,000.00
3 1 UNIT Pengadaan & Pemasangan Pompa Return Rp 3,592,000.00
4 1 UNIT Pengadaan & Pemasangan Pressure Tank 1000 liter Rp 666,000.00
5 1 UNIT Pengadaan & Pemasangan Electric Water Heater kapasitas : 50 Liter Rp 3,996,000.00
6 1 UNIT Pengadaan & Pemasangan Electric Water Heater kapasitas : 30 Liter Rp 3,072,000.00
7 1 M' Pengadaan & Pemasangan PIPA POLLYPROPELINE DIA. 1/2" PN-20 Rp 31,000.00
8 1 M' Pengadaan & Pemasangan PIPA POLLYPROPELINE DIA. 3/4" / PN-20 Rp 43,000.00
9 1 M' Pengadaan & Pemasangan PIPA POLLYPROPELINE DIA. 1" / PN - 20 Rp 64,000.00
10 1 M' Pengadaan & Pemasangan PIPA POLLYPROPELINE DIA. 1 1/4" / PN - 20 Rp 95,000.00
11 1 M' Pengadaan & Pemasangan PIPA POLLYPROPELINE DIA. 1 1/2" / PN - 20 Rp 141,000.00
12 1 M' Pengadaan & Pemasangan PIPA POLLYPROPELINE DIA. 2" / PN - 20 Rp 220,000.00
PEKERJAAN AIR RO
1 1 SET Pengadaan & Pemasangan SYSTEM RO Rp -
PEKERJAAN AIR KOTOR
1 1 UNIT PEMBUATAN POMPA SUBMERSIBLE SUMPIT Rp 13,839,000.00
2 1 UNIT PEMBUATAN GREASE TRAP Rp 4,214,000.00
3 1 UNIT PEMBUATAN SEPTIK TANK BIOTECH KAP. 1,2 M3/day Rp 6,771,000.00

Harga Satuan MEP - page 209 of 209