REKAPITULASI

BILL OF QUANTITY ( BOQ )


KEGIATAN PENINGKATAN SARANA DAN PRASARANA APARATUR DI UPTD BPB PADI
PEKERJAAN RENOVASI RUMAH DINAS
DINAS PERTANIAN DAN TANAMAN PANGAN - BALAI PENGEMBANGAN BENIH PADI
Jalan Terusan Mochamad Ali - Bojong Picung Kabupaten Cianjur
TAHUN ANGGARAN 2016

SUB. JUMLAH
NO URAIAN PEKERJAAN JUMLAH (Rp)
(Rp)

A PEKERJAAN PERSIAPAN 9,627,815.19

B PEKERJAAN TANAH 255,515.31

C PEKERJAAN PONDASI 1,964,813.00

D PEKERJAAN BETON 9,808,628.29

E PEKERJAAN
PEKERJAAN
PASANGAN
BETON 22,885,303.61

F PEKERJAAN KUSEN PINTU & JENDELA 26,732,199.67

G PEKERJAAN ATAP 39,743,957.49

H PEKERJAAN PLAFOND 12,662,891.99

I PEKERJAAN PENGECATAN 7,625,858.34

J PEKERJAAN MEKANIKAL & ELEKTRIKAL 11,171,847.78

J.1 PEK. ELEKTRIKAL 5,807,280.00

J.2 PEK. MEKANIKAL 5,364,567.78

JUMLAH (REAL COST) 142,478,830.68

PAJAK PERTAMBAHAN NILAI (PPN 10%) 14,247,883.07

JUMLAH TOTAL 156,726,713.74

JUMLAH DIBULATKAN 156,726,000.00

TERBILANG : '' SERATUS LIMA PULUH ENAM JUTA TUJUH RATUS DUA PULUH ENAM RIBU RUPIAH ''

Bandung, 15 APRIL 2016


Di buat oleh,
Penawar
FA. BANGUN

MUHAMAD DESMI DOWARI,SH


Direktur