Anda di halaman 1dari 118

RENCANA ANGGARAN BIAYA ( RAB )

PEKERJAAN : PEMBANGUNAN GEDUNG ADMINISTRASI


LOKASI : BANDAR UDARA MELALAN MELAK KAB. KUTAI BARAT
TAHUN ANGGARAN : 2019

Jumlah Harga
No Uraian Pekerjaan
(Rp)

REKAPITULASI

1 PEKERJAAN PERSIAPAN 18,586,040.00

2 PEKERJAAN TANAH 47,326,895.52

3 PEKERJAAN PONDASI 47,129,983.61

4 PEKERJAAN BETON BERTULANG 68,743,578.68

5 PEKERJAAN BETON BERTULANG 841,248,091.37

6 PEKERJAAN RANGKA ATAP 122,239,691.61

7 PEKERJAAN ATAP 333,975,924.86

8 PEKERJAAN DINDING 65,063,798.55

9 PEKERJAAN PINTU & JENDELA 799,606,440.88

10 PEKERJAAN LANTAI 109,888,593.04

11 PEKERJAAN FINISHING DINDING 124,855,903.80

12 PEKERJAAN PLAFOND 69,890,024.45

13 PEKERJAAN LAIN-LAIN 48,677,673.15

14 INSTALASI LISTRIK 70,225,045.00

15 SISTEM PLAMBING 25,456,187.00

16 SISTEM ALAT SANITASI 33,677,900.00

TOTAL 2,826,591,771.52
PPn 10 % 282,659,177.15
TOTAL 3,109,250,948.68
DIBULATKAN 3,109,251,000.00

Terbilang :

TIGA MILYAR SERATUS SEMBILAN JUTA DUA RATUS LIMA PULUH SATU RIBU RUPIAH

Sendawar , April 2017


DIBUAT,
KEPALA UNIT PENYELENGGARA KONSULTAN PERENCANA
BANDAR UDARA MELALAN MELAK CV. ARHSIYA UTAMA
KABUPATEN KUTAI BARAT

SUMARIYANTO, A.Md
Penata TK.I (III/d) GALIH PRASETYA UTAMA, ST
NIP. 19680214 198903 1 003 Direktur

MENGETAHUI,
KEPALA SUBDIREKTORAT
PRASARANA BANDAR UDARA

ARY WINARNI
Pembina (IV/a)
NIP. 19690319 199403 2 001
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERHUBUNGAN UDARA
KANTOR UPBU MELALAN MELAK
Jalan Sendawar Raya I Telp: - Fax :
Kamp. Gemuhan Asa Email: bandaramelak@yahoo.com
Barong Tongkok Kutai Barat Web site: -
Kode Pos 75776
band
 

HARGA PERKIRAAN SENDIRI (HPS)

UPBU : BANDAR UDARA MELALAN - MELAK


PEKERJAAN : PEMBANGUNAN GEDUNG ADMINISTRASI 200M2
LOKASI : BANDAR UDARA MELALAN - MELAK KAB. KUTAI BARAT
TAHUN ANGGARAN : 2019

NO URAIAN PEKERJAAN JUMLAH HARGA

I PEKERJAAN PERSIAPAN Rp 17,659,600.00


II PEKERJAAN TANAH Rp 115,852,913.56
III PEKERJAAN STRUKTUR Rp 137,880,731.76
IV PEKERJAAN PASANGAN Rp 355,380,542.40
V PEKERJAAN PELAPIS DINDING DAN LANTAI Rp 100,489,510.40
VI PEKERJAAN ATAP Rp 137,604,374.80
VII PEKERJAAN PLAFOND Rp 61,462,740.80
VIII PEKERJAAN KOSEN,PINTU DAN JENDELA Rp 198,432,940.52
IX PEKERJAAN PENGECATAN Rp 104,046,058.27
X PEKERJAAN SANITARY Rp 29,058,345.41
XII PEKERJAAN MEKANIKAL Rp 1,424,259.00
XII PEKERJAAN ELECTRIKAL Rp 12,611,545.63
XIII PEKERJAAN LAIN - LAIN Rp 830,000.00

A TOTAL Rp 1,272,733,562.55
B PPN 10% Rp 127,273,356.26
C JUMLAH A+B Rp 1,400,006,918.81
D DIBULATKAN Rp 1,400,000,000.00
Terbilang :
SATU MILYAR EMPAT RATUS JUTA RUPIAH

Sendawar, Januari 2019


Dibuat,
UNIT PENYELENGGARA BANDAR UDARA MELALAN MELAK
PEJABAT PEMBUAT KOMITMEN (PPK)

JECKSON SIHOMBING, SE.


NIP. 19760225 201012 1 001
Penata Muda (III/a)

MENGETAHUI,
KEPALA SUBDIREKTORAT

ARY WINARNI
Pembina (IV/a)
NIP. 19690319 199403 2 001
HARGA PERKIRAAN SENDIRI

SATUAN PEKERJAAN : BANDAR UDARA MELALAN - MELAK


PEKERJAAN : PEMBANGUNAN GEDUNG ADMINISTRASI 200M2
LOKASI : BANDAR UDARA MELALAN - MELAK KAB. KUTAI BARAT
TAHUN ANGGARAN : 2019

NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA

I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 600.00 Ls Rp 17,850.00 Rp 10,710,000.00
2 Pengukuran Dan Pekerjaan Bowplank 68.00 m¹ Rp 102,200.00 Rp 6,949,600.00

SUB TOTAL . I PEKERJAAN PERSIAPAN Rp 17,659,600.00


II PEKERJAAN TANAH
1 Galian tanah pondasi 97.73 m3 Rp 79,630.00 Rp 7,782,080.64
2 Urugan tanah kembali 37.26 m3 Rp 26,540.00 Rp 988,848.55
3 Pasang pondasi batu gunung 1 : 4 bangunan rumah 60.47 m3 Rp 1,212,340.00 Rp 73,309,229.93
4 Pekerjaan Aanstamping batu gunung 17.18 m3 Rp 1,817,250.00 Rp 31,218,083.44
5 Urugan pasir bawah pondasi 6.11 m3 Rp 418,250.00 Rp 2,554,671.00

SUB TOTAL . II PEKERJAAN TANAH Rp 115,852,913.56


III PEKERJAAN STRUKTUR
1 Cor beton bertulang sloof 15/20 cm 4.58 m3 Rp 5,696,250.00 Rp 26,094,521.25
2 Cor beton bertulang kolom praktis 13/10 cm 3.95 m3 Rp 9,248,850.00 Rp 36,575,502.21
3 Cor beton bertulang kolom Teras 25/25 cm 1.30 m3 Rp 9,248,850.00 Rp 12,023,505.00
4 Cor beton bertulang Ringbalk 15/20 cm 4.58 m3 Rp 7,275,100.00 Rp 33,327,233.10
5 Cor beton bertulang plat kanopy dan atap,tebal 10 & 15 cm 20.00 m2 Rp 766,560.00 Rp 15,331,200.00
6 Cor Meja beton bertulang ,tebal 10 cm 7.00 m3 Rp 266,880.00 Rp 1,868,160.00
7 Rabat Beton 1 : 3 : 5 tebal 5 cm teras 10.50 m3 Rp 1,205,772.40 Rp 12,660,610.20

SUB TOTAL . III PEKERJAAN STRUKTUR Rp 137,880,731.76


II PEKERJAAN PASANGAN
1 Pasang dinding bata merah 1:2 794.04 m² Rp 310,320.00 Rp 246,406,492.80
2 Plesteran dinding dan beton 1 : 4 1,588.08 m² Rp 68,620.00 Rp 108,974,049.60

SUB TOTAL . II PEKERJAAN PASANGAN Rp 355,380,542.40


III PEKERJAAN PELAPIS LANTAI DAN DINDING
A Pelapis Lantai
1 Lantai ubin granito 60 X 60 199.44 m2 Rp 452,510.00 Rp 90,248,594.40
2 Lantai ubin teraso 25x25 20.00 m² Rp 337,470.00 Rp 6,749,400.00
4 Dinding keramik 20x20 kamar mandi 18.20 m² Rp 158,710.00 Rp 2,888,522.00
5 Keramik Meja Dapur 20x20 2.10 m² Rp 287,140.00 Rp 602,994.00

SUB TOTAL . III PEKERJAAN PELAPIS LANTAI DAN DINDING Rp 100,489,510.40


NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA

IV PEKERJAAN ATAP
1 Pasang rangka atap baja ringan ( Zincalume ) 248.44 m2 Rp 353,100.00 Rp 87,724,164.00
2 Pasang atap genteng metal 248.44 m2 Rp 178,570.00 Rp 44,363,930.80
3 Pasang bubungan genteng metal 24.00 m1 Rp 115,870.00 Rp 2,780,880.00
4 Pasang listplank Fiber cement 0.8/10 cm & 1/25 cm 60.00 m1 Rp 45,590.00 Rp 2,735,400.00

SUB TOTAL . IV PEKERJAAN ATAP Rp 137,604,374.80


V PEKERJAAN PLAFOND
1 Penutup plafon GRC-board 4 mm lengkap dgn rangka hollow tebal 0.6 mm / tiap 1 m² 223.19 m² Rp 201,520.00 Rp 44,977,248.80
3 Lis Plafond Cornece Gypsump C12 305.40 m¹ Rp 53,980.00 Rp 16,485,492.00

SUB TOTAL . V PEKERJAAN PLAFOND Rp 61,462,740.80


VI PEKERJAAN KOSEN,PINTU DAN JENDELA
1 Pasang kusen kayu Bengkirai diroter 5.60 m3 Rp 7,935,250.00 Rp 44,437,400.00
2 Pasang daun pintu panil bengkirai 26.33 m2 Rp 598,780.00 Rp 15,762,883.50
3 Pasang daun jendela + kaca 5 mm 26.88 m2 Rp 447,360.00 Rp 12,025,036.80
4 Pasang Kisi-kisi kayu 26.88 unit Rp 350,000.00 Rp 9,408,000.00
5 Engsel Pintu 39.00 Bh Rp 46,923.44 Rp 1,830,014.06
6 Engsel Jendela 22.00 Bh Rp 46,923.44 Rp 1,032,315.63
7 Kunci Selot Pintu 13.00 Bh Rp 75,000.00 Rp 975,000.00
8 Kunci Selot Jendela 39.00 Bh Rp 50,000.00 Rp 1,950,000.00
9 Kunci Tanam Biasa 13.00 Bh Rp 216,000.00 Rp 2,808,000.00
10 Pasang Pegangan Pintu 13.00 Bh Rp 350,000.00 Rp 4,550,000.00
11 Pintu Type PJ1 (2 unit)
- Kusen Aluminium 41.16 m1 Rp 1,531,380.00 Rp 63,031,600.80
- Rangka Alumunium daun Pintu Kaca 23.76 m' Rp 809,110.00 Rp 19,224,453.60
- Kaca Tempered Polos t = 8 mm 17.18 m2 Rp 585,890.00 Rp 10,064,887.13
- Clear sealant 143.04 m1 Rp 15,709.38 Rp 2,247,069.00
- Engsel Type SEL FB08 4x3x3 4BB US32D ex Fino setara 12.00 bh Rp 107,550.00 Rp 1,290,600.00
- Pull handle Type P.45.07FB (45cm) US32+US32D ex Fino setara 4.00 Psg Rp 1,403,030.00 Rp 5,612,120.00
- Lockcase pelor AL Type FB8538-30 US32D ex Fino setara 2.00 bh Rp 513,870.00 Rp 1,027,740.00
- Double Cylinder Type DC.FB1001-60 US14 ex Fino setara 2.00 bh Rp 151,970.00 Rp 303,940.00
- Flush bolt Type FB.675 6” US32D ex Fino setara 2.00 bh Rp 145,000.00 Rp 290,000.00
- Flush bolt Type FB.675 12” US32D ex Fino setara 2.00 bh Rp 160,000.00 Rp 320,000.00
- Door closer Type 45713FB RA ex Fino setara 4.00 bh Rp 60,470.00 Rp 241,880.00

SUB TOTAL . VI PEKERJAAN KOSEN,PINTU DAN JENDELA Rp 198,432,940.52


VII PEKERJAAN PENGECATAN
1 Pengecatan dinding dan beton yang terlihat ( Interior ) 397.02 m² Rp 32,453.75 Rp 12,884,787.83
2 Pengecatan dinding dan beton yang terlihat ( Eksterior ) 397.02 m² Rp 32,453.75 Rp 12,884,787.83
3 Pengecatan plafond 223.19 m² Rp 33,138.75 Rp 7,396,237.61
4 Pengecatan Daun Pintu Jendela 216.51 m² Rp 223,242.95 Rp 48,333,326.51
5 Pengecatan listplank 305.40 m¹ Rp 73,827.50 Rp 22,546,918.50

SUB TOTAL . VII PEKERJAAN PENGECATAN Rp 104,046,058.27


NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA

VIII PEKERJAAN SANITARY


1 Closed Duduk + Accessories 3.00 unit Rp 3,912,500.00 Rp 11,737,500.00
2 Jet Shower + Accessories 3.00 unit Rp 268,296.88 Rp 804,890.63
3 Kran Air 7.00 ttk Rp 97,549.38 Rp 682,845.63
4 Washtafel 1.00 unit Rp 2,587,500.00 Rp 2,587,500.00
5 Kran Air Kitchen Zink 1.00 ttk Rp 586,350.00 Rp 586,350.00
6 Memasang Bak Cuci piring Stainless 1.00 unit Rp 2,470,000.00 Rp 2,470,000.00
7 Floor Drain 3.00 ttk Rp 50,000.00 Rp 150,000.00
8 Tandon Air Kap. 1200 Ltr 2.00 unit Rp 1,800,000.00 Rp 3,600,000.00
9 Septictank lengkap dengan peresapannya 1.00 unit Rp 6,439,259.16 Rp 6,439,259.16
SUB TOTAL . VIII PEKERJAAN SANITARY Rp 29,058,345.41
IX PEKERJAAN MEKANIKAL
1 Penyambungan air bersih dari bangunan terdekat 1.00 ls Rp 300,000.00 Rp 300,000.00
2 Pasang pipa pembuangan air kotor dia. 4' 18.00 m¹ Rp 25,000.00 Rp 450,000.00
3 Pasang pipa pembuangan air bekas pakai dia. 2' 13.00 m¹ Rp 25,611.75 Rp 332,952.75
4 Pasang pipa air bersih dia. 3/4 25.00 m¹ Rp 13,652.25 Rp 341,306.25
SUB TOTAL . IX PEKERJAAN MEKANIKAL Rp 1,424,259.00
X PEKERJAAN ELECTRIKAL
1 Instalasi Stop Kontak 21.00 ttk Rp 375,000.00 Rp 7,875,000.00
2 Pasang lampu TL 40 watt 28.00 ttk Rp 55,000.00 Rp 1,540,000.00
3 Pasang saklar ganda 8.00 ttk Rp 55,207.50 Rp 441,660.00
4 Pasang saklar tunggal 20.00 ttk Rp 53,208.75 Rp 1,064,175.00
5 Pasang stop kontak 21.00 ttk Rp 55,207.50 Rp 1,159,357.50
6 Pasang kotak MCB 12 Group lengkap 1.00 bh Rp 531,353.13 Rp 531,353.13

SUB TOTAL . X PEKERJAAN ELECTRIKAL Rp 12,611,545.63


XI PEKERJAAN LAIN - LAIN
1 Pembersihan kembali 1.00 Ls Rp 830,000.00 Rp 830,000.00

SUB TOTAL . XI PEKERJAAN LAIN - LAIN Rp 830,000.00


RENCANA ANGGARAN BIAYA ( RAB )
PEKERJAAN : PEMBANGUNAN GEDUNG ADMINISTRASI
LOKASI : BANDAR UDARA MELALAN MELAK KAB. KUTAI BARAT
TAHUN ANGGARAN : 2018

Harga Satuan Jumlah Harga


No Uraian Pekerjaan Satuan Volume
(Rp) (Rp)

I PEKERJAAN PERSIAPAN

1 Pek. Pembersihan Lapangan dan Perataan m2 600.00 17,850.00 10,710,000.00


2 Pek. Pemasangan Bowplank m' 68.00 102,200.00 6,949,600.00
3 Pek. Papan Nama Proyek bh 1.00 926,440.00 926,440.00

Sub Total Pekerjaan Persiapan 18,586,040.00

II PEKERJAAN TANAH

1 Pek. Galian Tanah Pondasi m3 251.57 97,890.00 24,625,776.77


2 Pek. Urugan Tanah kembali dan meratakan m3 212.35 26,540.00 5,635,682.25
3 Pek. Urugan Pasir Bawah Pondasi m3 9.79 418,250.00 4,096,591.45
4 Pek. Lantai Kerja di bawah Pondasi m3 1.44 - -
5 Pek. Urugan Pasir Bawah Sloof m3 3.63 418,250.00 1,519,355.86
6 Pek. Lantai Kerja di bawah sloof m3 1.82 - -
7 Pek. Urugan Pasir Bawah Lantai m3 27.37 418,250.00 11,449,489.19
8 Pek. Lantai Kerja di bawah Lantai m3 13.69 - -

Sub Total Pekerjaan Tanah 47,326,895.52

III STRUKTUR BAWAH

PEKERJAAN PONDASI

1 Pasangan Pondasi Batu Kali 1 : 5 m3 26.67 1,092,500.00 29,137,630.50


Angkur Besi D 13 - 1000 mm kg 83.17 16,030.00 1,333,158.00

2 Pek. Pondasi beton Tapak


Beton K-225 m3 3.50 1,249,310.00 4,372,585.00
Bekisting m2 12.00 15,610.00 187,320.00
Besi D 13 kg 754.79 16,030.00 12,099,290.11

Sub Total Pekerjaan Pondasi 47,129,983.61


RENCANA ANGGARAN BIAYA ( RAB )
PEKERJAAN : PEMBANGUNAN GEDUNG ADMINISTRASI
LOKASI : BANDAR UDARA MELALAN MELAK KAB. KUTAI BARAT
TAHUN ANGGARAN : 2018

Harga Satuan Jumlah Harga


No Uraian Pekerjaan Satuan Volume
(Rp) (Rp)

PEKERJAAN BETON BERTULANG

1 Pek. Beton Sloof ( TB1 )


Beton K-225 m3 6.08 1,249,310.00 7,592,181.80
Bekisting m2 81.03 249,460.00 20,213,244.88
Besi D 10 kg 599.93 16,030.00 9,616,898.93
Besi D 13 kg 871.33 16,030.00 13,967,479.54

2 Pek. Kolom Pedestal


Beton K-225 m3 2.34 1,249,310.00 2,923,385.40
Bekisting m2 31.20 251,750.00 7,854,600.00
Besi D 10 kg 128.34 16,030.00 2,057,226.08
Besi D 13 kg 281.88 16,030.00 4,518,562.05

Sub Total Pekerjaan Beton Bertulang 68,743,578.68

IV STRUKTUR ATAS

PEKERJAAN BETON BERTULANG

1 Pek. Plat Beton Lantai Dasar


Beton K-225 m3 32.85 1,249,310.00 41,039,458.71
Bekisting m2 17.92 249,460.00 4,470,822.12
Besi D 10 kg 5,529.07 16,030.00 88,631,052.88

2 Pek. Kolom Beton


Beton K-225 m3 7.68 1,249,310.00 9,588,704.11
Bekisting m2 103.54 251,750.00 26,065,188.00
Besi Ø 8 kg 9.65 1,549,180.00 14,944,703.98
Besi D 10 kg 504.32 16,030.00 8,084,232.43
Besi D 13 kg 835.95 16,030.00 13,400,275.03

3 Pek. Kolom Beton Praktis


Beton K-225 m3 1.08 1,249,310.00 1,348,535.20
Bekisting m2 35.98 251,750.00 9,058,166.40
Besi Ø 8 kg 158.62 1,549,180.00 245,732,289.92
Besi D 10 kg 209.64 16,030.00 3,360,535.77

4 Pek. Balok Beton


Beton K-225 m3 11.80 1,249,310.00 14,736,485.97
Bekisting m2 137.97 340,520.00 46,980,182.32
Besi Ø 8 kg 73.80 1,549,180.00 114,322,008.28
Besi D 10 kg 1,181.67 16,030.00 18,942,237.01
Besi D 13 kg 1,039.52 16,030.00 16,663,478.21

5 Pek. Beton Plat dak ( ELV 3.000 )


Beton K-225 m3 1.69 1,249,310.00 2,116,800.88
Bekisting m2 14.12 340,520.00 4,808,074.30
Besi D 10 kg 285.19 16,030.00 4,571,558.61
RENCANA ANGGARAN BIAYA ( RAB )
PEKERJAAN : PEMBANGUNAN GEDUNG ADMINISTRASI
LOKASI : BANDAR UDARA MELALAN MELAK KAB. KUTAI BARAT
TAHUN ANGGARAN : 2018

Harga Satuan Jumlah Harga


No Uraian Pekerjaan Satuan Volume
(Rp) (Rp)

6 Pek. Beton Plat dak ( ELV 4.000 )


Beton K-225 m3 17.15 1,249,310.00 21,426,166.22
Bekisting m2 142.92 340,520.00 48,667,118.40
Besi D 10 kg 2,886.66 16,030.00 46,273,116.93

7 Pek. Lisplang Beton


Beton K-225 m3 3.17 1,249,310.00 3,964,060.63
Bekisting m2 63.46 340,520.00 21,609,399.20
Besi D 10 kg 651.49 16,030.00 10,443,439.87

Sub Total Pekerjaan Beton Bertulang 841,248,091.37

V PEKERJAAN RANGKA ATAP

1 Pipa Hitam Schedule 40 Ø 3" m 125.11 466,750.00 58,395,092.50


2 Pipa Hitam Schedule 40 Ø 2.1/2" m 62.96 305,000.00 19,202,800.00
3 Balok Gording C 125 x 50 x 20 x 3,2 kg 1,104.00 33,180.00 36,630,720.00
4 Ikatan angin Ø 12 kg 32.25 16,030.00 517,002.12
5 Trekstang Ø 10 kg 41.46 16,030.00 664,642.27
6 Turn Buckle Ø 12 bh 6.00 75,000.00 450,000.00
7 Plate 6 mm kg 19.69 33,180.00 653,216.32
8 Base Plate 8 mm kg 19.48 33,180.00 646,318.75
9 Baut Ø 12 mm bh 45.00 15,440.00 694,800.00
10 Angkur Ø 12 mm L = 400 mm bh 24.00 50,000.00 1,200,000.00
11 Cat Rangka Atap ( Gording dan Pipa ) m2 125.35 25,410.00 3,185,099.64

Sub Total Pekerjaan Rangka Atap 122,239,691.61


Pondasi Tapak P-1 ( 20 Bh )
1 Galian Tanah Pondasi m3 P = 1.813 m
L = 1.813 m
H = 1.650 m
N = 20 Bh

2 Urugan Tanah Kembali m3

3 Pasir Urug Bawah Pondasi m3 P = 1.200 m


L = 1.200 m
H = 0.100 m

4 Plastik Cor P = 0.000 m


L = 0.000 m

5 Lantai Kerja k 100 m3 P = 1.200 m


L = 1.200 m
H = 0.050 m

6 Beton K 225 Tapak Pondasi m3 P = 1.000 m


L = 1.000 m
H = 0.175 m

7 Beton K 225 Kolom di Bawah Lantai m3 P = 0.300 m


L = 0.300 m
H = 1.300 m

8 Bekisting Pondasi m2 P = 1.000 m


L = 1.000 m
H = 0.150 m

Bekisting Kolom di Bawah Lantai m2 P = 0.300 m2


L = 0.300 m
H = 1.300 bh

9 Reforcement Bar

Dia 13 c a = 0.052 m
a
c = 0.940 m
W= 1.040

n1 = 6.267 +1 =
N = 20 Bh

Jadi untuk volume per / bh berat b


Total Berat Besi dia 13

Dia 13 a = 0.052 m
a b = 0.090 m
b c = 0.940 m
c W = 1.040

n1 = 6.267 +1 =
N = 20 Bh

Jadi untuk volume per / bh berat b


Total Berat Besi dia 13

K-1 Besi Kolom di Bawah Lantai

a a = 0.052 m
b = 0.130 m
8 Dia 13 c = 1.460 m
c W = 1.040

n1 = 8.000 =
N = 20 Bh
b
Jadi untuk volume per / bh berat b
Total Berat Besi dia 13

300
Dia 10 a = 0.040 m
b = 0.240 m
300
W= 0.617

n1 = 8.267 +1 =
N = 20 Bh
Jadi untuk volume per / bh berat b
Total Berat Besi dia 10
= 5.421 m3

VolumeTotal = 108.41 m3

Volume Total = 100.47 m3

Volume Total = 2.880 m3

Volume Total = 0.000 m2

Volume Total = 1.440 m3

Volume 1= 3.500 m3

Volume 1= 0.117 m3

Volume Total = 2.34 m3

Volume 1= 12.000 m2

Volume 1= 1.560 m2

Volume Total = 31.20 m2

a total = 0.208 m
c total = 1.880 m

L1 total = 2.088 m
8

olume per / bh berat besi = 17.4 kg


Besi dia 13 = 347.44 kg

a total = 0.208 m
b total = 0.360 m
c total = 1.880 m

L1 total = 2.448 m
8

olume per / bh berat besi = 20.4 kg


Besi dia 13 = 407.35 kg

a total = 0.104 m
b total = 0.130 m
c total = 1.460 m

L1 total = 1.694 m
8

olume per / bh berat besi = 14.1 kg


Besi dia 13 = 281.88 kg

a total = 0.080 m
b total = 0.960 m

L1 total = 1.040 m
10
olume per / bh berat besi = 6.4 kg
Besi dia 10 = 128.34 kg
PERHITUNGAN VOLUME PONDASI BATU KALI

Pondasi Batu Kali


Total Panjang Pondasi m 98.78

1 Galian Tanah Pondasi


m3 A=
B=
C=

m3 A=
B=

2 Urugan Tanah Kembali m3

3 Pasir Urug Bawah Pondasi m3


B=
C=

B=
C=

4 Pondasi Batu Kali m3 A=


B=
A C=
200
300 A=
B=

200

600 C

1:04

100 Pasir Urug


600

Angkur dia 13 - 1000 a=

a c=
c W=

n1 =

Jadi untuk volume per / bh be


Total Berat Besi dia 8

GALIAN TANAH UNTUK DAERAH PONDASI BATU KALI

P L T M3
AS 1 - 2 ; B - E -
AS 7 - 8 ; B - D -
TOTAL - M3

TIMBUNAN TANAH UNTUK DAERAH PONDASI BATU KALI

P L T M3
AS 1 - 2 ; B - E -
AS 7 - 8 ; B - D -
TOTAL - M3

Pek. Urugan Tanah didatangkan dari luar area dikurangi Pek. Galian Tanah

Pek. Urugan Tanah didatangkan dari luar area = - m3

Pek. Galian Tanah Pondasi = 251.57 m3


Jadi Pek. Urugan Tanah yang didatangkan dari luar area adalah = (251.57) m3
1.45 m
1.00 m
0.90 m Luas Total = 1.10 m2 108.90 m3

0.25 m
0.20 m Luas Total = 0.05 m2 m3

Luas Total = 0.87 m2 86.19 m3

0.70 m
0.10 m Luas Total = 0.07 m2 6.91 m3

0.20 m
0.05 m Luas Total = 0.01 m2 m3

0.30 m
0.60 m
0.60 m Luas Total = 0.27 m2 26.67 m3

0.20 m
0.30 m
Luas Total = 0.06 m2 m3
0.052 m a total = 0.104 m

0.300 m c total = 0.300 m


1.042
L1 total = 0.404 m
1.000 +1 = 2

k volume per / bh berat besi = 0.8 kg


at Besi dia 8 = 83.17 kg
KOLOM BETON ( K-1 )

LANTAI DASAR 4 BH

Tinggi Penulangan Kolom 4.02 m'


Tinggi Beton Kolom 3.50 m'

1 Beton K-225 m2 A = 0.090 m2 Luas


B = 1.00 m

2 Bekisting Kolom m' A = 1.200 m

3 Reforcement Bar

Sengkang

10 - 150 kg a = 0.040 m a
150 b = 0.240 m b
300
W = 0.620 kg
L1
b L2
n1 = 6.667 +1 = 8.00

Jadi untuk jarak per / m' berat besi


Jadi jarak per / m' berat besi 10 ( Tumpuan )

TOTAL BESI 10

Tulangan Pokok

8 D 13
a kg a = 0.052 m a
b = 11.896 m b
W = 1.042 kg
L2
c = 0.52 m
b d = 11.376 m
L2

Jadi untuk jarak per / m' berat besi 13


c
TOTAL BESI 13

REKAP PEMBESIAN KOLOM ( K-1 )

BESI D 10 MM 82.95 Kg

BESI D 13 MM 138.24 kg
KOLOM BETON ( K-1 )

LANTAI DASAR 4 BH

Tinggi Penulangan Kolom 4.40 m'


Tinggi Beton Kolom 3.88 m'

1 Beton K-225 m2 A = 0.090 m Luas


B = 1.00 m

2 Bekisting Kolom m' A = 1.200 m

3 Reforcement Bar

Sengkang

10 - 150 kg a = 0.040 m a
150 b = 0.240 m b

W = 0.620 kg
300 L1
L2
n1 = 6.667 +1 = 8.00
b
Jadi untuk jarak per / m' berat besi
Jadi jarak per / m' berat besi 10 ( Tumpuan )

TOTAL BESI 10

Tulangan Pokok

8 D 13
a kg a = 0.052 m a
b = 11.896 m b
W = 1.042 kg
L2
c = 0.52 m
b d = 11.376 m
L2

Jadi untuk jarak per / m' berat besi 13


c
TOTAL BESI 13

REKAP PEMBESIAN KOLOM ( K-1 )

BESI D 10 MM 90.79 Kg
BESI D 13 MM 151.30 kg

KOLOM BETON ( K-1 )

LANTAI DASAR 2 BH

Tinggi Penulangan Kolom 3.40 m'


Tinggi Beton Kolom 2.88 m'

1 Beton K-225 m2 A = 0.090 m Luas


B = 1.00 m

2 Bekisting Kolom m' A = 1.200 m

3 Reforcement Bar

Sengkang

10 - 150 kg a = 0.040 m a
150 b = 0.240 m b

W = 0.620 kg
300 L1
L2
n1 = 6.667 +1 = 8.00
b
Jadi untuk jarak per / m' berat besi
Jadi jarak per / m' berat besi 10 ( Tumpuan )

TOTAL BESI 10

Tulangan Pokok

8 D 13
a kg a = 0.052 m a
b = 11.896 m b
W = 1.042 kg
L2
c = 0.52 m
b d = 11.376 m
L2

Jadi untuk jarak per / m' berat besi 13


c
TOTAL BESI 13

REKAP PEMBESIAN KOLOM ( K-1 )


BESI D 10 MM 35.08 Kg

BESI D 13 MM 58.46 kg

KOLOM BETON ( K-1 )

LANTAI DASAR 10 BH

Tinggi Penulangan Kolom 5.37 m'


Tinggi Beton Kolom 4.85 m'

1 Beton K-225 m2 A = 0.090 m Luas


B = 1.00 m

2 Bekisting Kolom m' A = 1.200 m

3 Reforcement Bar

Sengkang

10 - 150 kg a = 0.040 m a
150 b = 0.240 m b

W = 0.620 kg
300 L1
L2
n1 = 6.667 +1 = 8.00
b
Jadi untuk jarak per / m' berat besi
Jadi jarak per / m' berat besi 10 ( Tumpuan )

TOTAL BESI 10

Tulangan Pokok

8 D 13
a kg a = 0.052 m a
b = 11.896 m b
W = 1.042 kg
L2
c = 0.52 m
b d = 11.376 m
L2

Jadi untuk jarak per / m' berat besi 13


c
TOTAL BESI 13
REKAP PEMBESIAN KOLOM ( K-1 )

BESI D 10 MM 277.01 Kg

BESI D 13 MM 461.65 kg

KOLOM BETON ( K-2 )

LANTAI DASAR 4 BH

Tinggi Penulangan Kolom 1.02 m'


Tinggi Beton Kolom 0.50 m'

1 Beton K-225 m2 A = 0.045 m Luas


B = 1.00 m

2 Bekisting Kolom m' A = 0.900 m

3 Reforcement Bar

Sengkang

10 - 150 kg a = 0.040 m a
150 b = 0.090 m b
c = 0.240 m b
W = 0.620 kg
150 L1
L2
n1 = 3.333 +1 = 5.00
.300
Jadi untuk jarak per / m' berat besi
Jadi jarak per / m' berat besi 10 ( Tumpuan )

TOTAL BESI 10

Tulangan Pokok

6 D 13
a kg a = 0.052 m a
b = 11.896 m b
W = 1.042 kg
L2
c = 0.52 m
b d = 11.376 m
L2
Jadi untuk jarak per / m' berat besi 13
c
TOTAL BESI 13

REKAP PEMBESIAN KOLOM ( K-2 )

BESI D 10 MM 9.36 Kg

BESI D 13 MM 26.31 kg

KOLOM BETON ( K-3 )

LANTAI ELEVASI + O.OO 4 BH

Tinggi Penulangan Kolom 0.90 m'


Tinggi Beton Kolom 0.50 m'

1 Beton K-225 m2 A = 0.023 m Luas


B = 1.00 m

2 Bekisting Kolom m' A = 0.600 m

3 Reforcement Bar

Sengkang

8 - 150 kg a = 0.032 m a
150 b = 0.360 m b
150 W = 0.395 kg
L1
L2
n1 = 6.267 +1 = 8.00
150
Jadi untuk jarak per / m' berat besi
Jadi jarak per / m' berat besi 8 ( Tumpuan )

TOTAL BESI 8

Tulangan Pokok

4 D 10
a kg a = 0.04 m a
b = 11.92 m b
W = 0.620 kg
L2
c = 0.4 m
b d = 11.52 m
b
L2

Jadi untuk jarak per / m' berat besi 10


c
TOTAL BESI 10

REKAP PEMBESIAN KOLOM ( K-3 )

BESI D 8 MM 9.65 Kg

BESI D 10 MM 9.14 kg

KOLOM PRAKTIS ( KP1 )

LANTAI ELEVASI + O.OO 17 BH

Tinggi Penulangan Kolom 4.28 m'


Tinggi Beton Kolom 3.88 m'

1 Beton K-225 m2 A = 0.014 m Luas


B = 1.00 m

2 Bekisting Kolom m' A = 0.480 m

3 Reforcement Bar

Sengkang

8 - 150 kg a = 0.032 m a
150 b = 0.240 m b
120 W = 0.395 kg
L1
L2
n1 = 6.267 +1 = 8.00
120
Jadi untuk jarak per / m' berat besi
Jadi jarak per / m' berat besi 8 ( Tumpuan )

TOTAL BESI 8

Tulangan Pokok

4 D 10
a kg a = 0.04 m a
b = 11.92 m b
W = 0.620 kg
L2
c = 0.4 m
b d = 11.52 m
L2

Jadi untuk jarak per / m' berat besi 10


c
TOTAL BESI 10

REKAP PEMBESIAN KOLOM PRAKTIS

BESI D 8 MM 139.79 Kg

BESI D 10 MM 184.76 kg

KOLOM PRAKTIS ( KP-1 )

LANTAI ELEVASI + O.OO 2 BH

Tinggi Penulangan Kolom 4.90 m'


Tinggi Beton Kolom 4.50 m'

1 Beton K-225 m2 A = 0.014 m Luas


B = 1.00 m

2 Bekisting Kolom m' A = 0.480 m

3 Reforcement Bar

Sengkang

8 - 150 kg a = 0.032 m a
150 b = 0.240 m b
120 W = 0.395 kg
L1
L2
n1 = 6.267 +1 = 8.00
120
Jadi untuk jarak per / m' berat besi
Jadi jarak per / m' berat besi 8 ( Tumpuan )

TOTAL BESI 8

Tulangan Pokok

4 D 10
a kg a = 0.04 m a
b = 11.92 m b
W = 0.620 kg
L2
c = 0.4 m
b d = 11.52 m
L2

Jadi untuk jarak per / m' berat besi 10


c
TOTAL BESI 10

REKAP PEMBESIAN KOLOM PRAKTIS

BESI dia 8 MM 18.83 Kg

BESI D 10 MM 24.88 kg
Total = 0.090 m2 1.26 m3

16.800 m2

total = 0.080 m
total = 0.960 m

total = 1.040 m
total = 0.645 kg

= 5.16 kg
0 ( Tumpuan ) = 5.16 kg

TOTAL BESI 10 = 82.95 kg

total = 0.10 m
total = 11.90 m

= 12.00 m

= 192.00 m
= 200.06 kg
= 8.60 kg

TOTAL BESI 13 = 138.24 kg


Total = 0.090 m2 1.40 m3

18.624 m2

total = 0.080 m
total = 0.960 m

total = 1.040 m
total = 0.645 kg

= 5.16 kg
0 ( Tumpuan ) = 5.16 kg

TOTAL BESI 10 = 90.79 kg

total = 0.10 m
total = 11.90 m

= 12.00 m

= 192.00 m
= 200.06 kg
= 8.60 kg

TOTAL BESI 13 = 151.30 kg


Total = 0.090 m2 0.52 m3

6.912 m2

total = 0.080 m
total = 0.960 m

total = 1.040 m
total = 0.645 kg

= 5.16 kg
0 ( Tumpuan ) = 5.16 kg

TOTAL BESI 10 = 35.08 kg

total = 0.10 m
total = 11.90 m

= 12.00 m

= 192.00 m
= 200.06 kg
= 8.60 kg

TOTAL BESI 13 = 58.46 kg


Total = 0.090 m2 4.37 m3

58.200 m2

total = 0.080 m
total = 0.960 m

total = 1.040 m
total = 0.645 kg

= 5.16 kg
0 ( Tumpuan ) = 5.16 kg

TOTAL BESI 10 = 277.01 kg

total = 0.10 m
total = 11.90 m

= 12.00 m

= 192.00 m
= 200.06 kg
= 8.60 kg

TOTAL BESI 13 = 461.65 kg


Total = 0.045 m2 0.09 m3

1.800 m2

total = 0.080 m
total = 0.180 m
total = 0.480 m

total = 0.740 m
total = 0.459 kg

= 2.29 kg
0 ( Tumpuan ) = 2.29 kg

TOTAL BESI 10 = 9.36 kg

total = 0.10 m
total = 11.90 m

= 12.00 m

= 144.00 m
= 150.05 kg
= 6.45 kg

TOTAL BESI 13 = 26.31 kg

Total = 0.023 m2 0.05 m3

1.200 m2

total = 0.064 m
total = 0.360 m

total = 0.424 m
total = 0.167 m

= 1.34 kg
( Tumpuan ) = 2.68 kg

TOTAL BESI 8 = 9.65 kg

total = 0.08 m
total = 11.92 m

= 12.00 m
= 96.00 m
= 59.52 kg
= 2.54 kg

TOTAL BESI 10 = 9.14 kg

Total = 0.014 m2 0.95 m3

31.661 m2

total = 0.064 m
total = 0.240 m

total = 0.304 m
total = 0.120 m

= 0.96 kg
( Tumpuan ) = 1.92 kg

TOTAL BESI 8 = 139.79 kg

total = 0.08 m
total = 11.92 m

= 12.00 m
= 96.00 m
= 59.52 kg
= 2.54 kg

TOTAL BESI 10 = 184.76 kg

Total = 0.014 m2 0.13 m3

4.320 m2

total = 0.064 m
total = 0.240 m

total = 0.304 m
total = 0.120 m

= 0.96 kg
( Tumpuan ) = 1.92 kg

TOTAL BESI 8 = 18.83 kg

total = 0.08 m
total = 11.92 m
= 12.00 m

= 96.00 m
= 59.52 kg
= 2.54 kg

TOTAL BESI 10 = 24.88 kg


PERHITUNGAN VOLUME PLAT BETON

PLAT BETON LANTAI


1 Beton K m2 A = 1.00 m Volume Total =
B = 1.00 m
C = 0.12 m

2 Bekisting Plat m2 A = 149.4 m

3 Reforcement Bar

Besi dia 10 - 150 kg a = 0.04 m a total =


b = 11.92 m b total =
W = 0.62 kg
L total =
a n = 6.667 +1 = 8
n total =
c = 0.40 m
b d = 11.60 m
L2 =
=
Jadi untuk jarak per / m2 berat besi =

Besi dia 10 - 150 kg a = 0.04 m a total =


b = 11.92 m b total =
W = 0.62 kg
L total =
a n = 6.667 +1 = 8
n total =
c = 0.40 m
b d = 11.60 m
L2 =
=
Jadi untuk jarak per / m2 berat besi =

Plat Beton 274

Total 274 m2

PLAT DAK BETON ELEVASI + 3.000


1 Beton K m2 A = 1.00 m Volume Total =
B = 1.00 m
C = 0.12 m

2 Bekisting Plat m2 A = 14.1 m2

3 Reforcement Bar

Besi dia 10 - 150 kg a = 0.04 m a total =


b = 11.92 m b total =
W = 0.62 kg
L total =
a n = 6.667 +1 = 8
n total =
c = 0.40 m
b d = 11.60 m
L2 =
=
Jadi untuk jarak per / m2 berat besi =

Besi dia 10 - 150 kg a = 0.04 m a total =


b = 11.92 m b total =
W = 0.62 kg
L total =
a n = 6.667 +1 = 8
n total =
c = 0.40 m
b d = 11.60 m
L2 =
=
Jadi untuk jarak per / m2 berat besi =

Plat Dak Beton 14.12

Total 14.12 m2

PLAT DAK BETON ELEVASI + 4.000


1 Beton K m2 A = 1.00 m Volume Total =
B = 1.00 m
C = 0.12 m

2 Bekisting Plat m2 A = 1.0 m2

3 Reforcement Bar

Besi dia 10 - 150 kg a = 0.04 m a total =


b = 11.92 m b total =
W = 0.62 kg
L total =
a n = 6.667 +1 = 8
n total =
c = 0.40 m
b d = 11.60 m
L2 =
=
Jadi untuk jarak per / m2 berat besi =

Besi dia 10 - 150 kg a = 0.04 m a total =


b = 11.92 m b total =
W = 0.62 kg
L total =
a n = 6.667 +1 = 8
n total =
c = 0.40 m
b d = 11.60 m
L2 =
=
Jadi untuk jarak per / m2 berat besi =

Plat Dak Beton 142.92

Total 142.92 m2
0.120 m3 32.85 m3

17.9 m2

0.08 m
11.92 m

12.00 m

16.00 bh

385.280 m
237.52512 kg
10.099 kg 2,764.5 kg

0.08 m
11.92 m

12.00 m

16.00 bh

385.280 m
237.52512 kg
10.099 kg 2,764.5 kg

0.120 m3 1.69 m3
14.1 m2

0.08 m
11.92 m

12.00 m

16.00 bh

385.280 m
237.52512 kg
10.099 kg 142.6 kg

0.08 m
11.92 m

12.00 m

16.00 bh

385.280 m
237.52512 kg
10.099 kg 142.6 kg

0.120 m3 17.15 m3

142.9 m2

0.08 m
11.92 m
12.00 m

16.00 bh

385.280 m
237.52512 kg
10.099 kg 1,443.3 kg

0.08 m
11.92 m

12.00 m

16.00 bh

385.280 m
237.52512 kg
10.099 kg 1,443.3 kg
LISPLANG BETON ELEVASI + 3.000 NO
A Lisplang Lihat Gambar
L Total = 10.96 m 1
B A 0.50 m
B 0.10 m
(juml Tul ats & bwh) tump kiri 10 bh
(Tul Utama) lap 10 bh
tump kanan 10 bh
besi dia 10 mm
(Tul Tengah) h) jumlah 0 bh
besi dia 10 mm a
(Tul Sengkang) besi dia jarak
tump kiri 10 - 200 mm
lap 10 - 200 mm
tump kanan 10 - 200 mm

c
LISPLANG BETON ELEVASI + 4.000 NO
A Lisplang Lihat Gambar
L Total = 52.50 m 1
B A 0.50 m
B 0.10 m
(juml Tul ats & bwh) tump kiri 10 bh
(Tul Utama) lap 10 bh
tump kanan 10 bh
besi dia 10 mm
(Tul Tengah) h) jumlah 0 bh
besi dia 10 mm a
(Tul Sengkang) besi dia jarak
tump kiri 10 - 200 mm
lap 10 - 200 mm
tump kanan 10 - 200 mm

c
B
Jenis Balok Tumpuan Kiri

Lisplang Lihat Gambar L Total = 10.96 m


30-Dec Beton A = 0.50 m Luas Total =

A B = 0.10 m
Bekisting A bkst = 1.00 m Panjang Total =
B
As Lihat Gambar
Pembesian

(Tul Utama)
(juml Tul ats & bwh) tump kiri 10
tump kanan 10 a = 0.040 m a total =
lap 10 b = 11.920 m b total =
a Besi D 10 W = 0.617 kg
L =
b c = 0.400 m
d = 11.520 m
L2 =
=
Jadi untuk jarak per / m' berat besi =

(Tul Tengah) jumlah 0


besi dia 10 a = 0.040 m a total =
b = 11.920 m b total =
a W = 0.617 kg
L =
b c = 0.400 m
d = 11.520 m
L2 =
=
Jadi untuk jarak per / m' berat besi =

(Tul Sengkang) dia tump kiri 10 - 200 a = 0.040 m a total =


dia tump kanan 10 - 200 b = 0.040 m b total =
la 10 - 200 c = 0.440 m c total =
c W = 0.617 kg
500 A L total =
a
b n = 4.700 + 1 = 6
100 Jadi untuk jarak per / m' berat besi =
B

B
Jenis Balok Tumpuan Kiri

Lisplang Lihat Gambar L Total = 52.50 m


30-Dec Beton A = 0.50 m Luas Total =

A B = 0.10 m
Bekisting A bkst = 1.00 m Panjang Total =
B
As Lihat Gambar
Pembesian

(Tul Utama)
(juml Tul ats & bwh) tump kiri 10
tump kanan 10 a = 0.040 m a total =
lap 10 b = 11.920 m b total =
a Besi D 10 W = 0.617 kg
L =
b c = 0.400 m
d = 11.520 m
L2 =
=
Jadi untuk jarak per / m' berat besi =

(Tul Tengah) jumlah 0


besi dia 10 a = 0.040 m a total =
b = 11.920 m b total =
a W = 0.617 kg
L =
b c = 0.400 m
d = 11.520 m
L2 =
=
Jadi untuk jarak per / m' berat besi =

(Tul Sengkang) dia tump kiri 10 - 200 a = 0.040 m a total =


dia tump kanan 10 - 200 b = 0.040 m b total =
la 10 - 200 c = 0.440 m c total =
c W = 0.617 kg
500 A L total =
a
b n = 4.700 + 1 = 6
100 Jadi untuk jarak per / m' berat besi =
B

B
ri Tumpuan Lapangan Tumpuan Kanan

0.05 m2 V. Beton = 0.55 m3 Total berat Besi =

1.00 m' L. Bekisting = 10.96 m2

0.080 m a = 0.040 m a total = 0.080 m a = 0.040 m a


11.920 m b = 11.920 m b total = 11.920 m b = 11.920 m b
W = 0.617 kg W = 0.617 kg
12.000 m L = 12.000 m L
c = 0.400 m c = 0.400 m
d = 11.520 m d = 11.520 m
240.000 m L2 = 240.000 m L2
148.08 kg = 148.08 kg
6.317 kg Jadi untuk jarak per / m' berat besi = 6.317 kg Jadi untuk jarak per / m' berat besi
Bentang

0.080 m a = 0.040 m a total = 0.080 m a = 0.040 m a


11.920 m b = 11.920 m b total = 11.920 m b = 11.920 m b
W = 0.617 kg W = 0.617 kg
12.000 m L = 12.000 m L
c = 0.400 m c = 0.400 m
d = 11.520 m d = 11.520 m
0.000 m L2 = 0.000 m L2
0 kg = 0 kg
0.000 kg Jadi untuk jarak per / m' berat besi = 0.000 kg Jadi untuk jarak per / m' berat besi
Bentang
0.080 m a = 0.040 m a total = 0.080 m a = 0.040 m a
0.120 m b = 0.040 m b total = 0.080 m b = 0.040 m b
0.880 m c = 0.440 m c total = 0.880 m c = 0.440 m c
W = 0.617 kg W = 0.617 kg
1.080 m L total = 1.040 m L

n = 4.700 + 1 = 6 n = 4.700 + 1 =
3.998 kg Jadi untuk jarak per / m' berat besi = 3.850 kg Jadi untuk jarak per / m' berat besi
Bentang

ri Tumpuan Lapangan Tumpuan Kanan

0.05 m2 V. Beton = 2.63 m3 Total berat Besi =

1.00 m' L. Bekisting = 52.50 m2

0.080 m a = 0.040 m a total = 0.080 m a = 0.040 m a


11.920 m b = 11.920 m b total = 11.920 m b = 11.920 m b
W = 0.617 kg W = 0.617 kg
12.000 m L = 12.000 m L
c = 0.400 m c = 0.400 m
d = 11.520 m d = 11.520 m
240.000 m L2 = 240.000 m L2
148.08 kg = 148.08 kg
6.317 kg Jadi untuk jarak per / m' berat besi = 6.317 kg Jadi untuk jarak per / m' berat besi
Bentang

0.080 m a = 0.040 m a total = 0.080 m a = 0.040 m a


11.920 m b = 11.920 m b total = 11.920 m b = 11.920 m b
W = 0.617 kg W = 0.617 kg
12.000 m L = 12.000 m L
c = 0.400 m c = 0.400 m
d = 11.520 m d = 11.520 m
0.000 m L2 = 0.000 m L2
0 kg = 0 kg
0.000 kg Jadi untuk jarak per / m' berat besi = 0.000 kg Jadi untuk jarak per / m' berat besi
Bentang
0.080 m a = 0.040 m a total = 0.080 m a = 0.040 m a
0.120 m b = 0.040 m b total = 0.080 m b = 0.040 m b
0.880 m c = 0.440 m c total = 0.880 m c = 0.440 m c
W = 0.617 kg W = 0.617 kg
1.080 m L total = 1.040 m L

n = 4.700 + 1 = 6 n = 4.700 + 1 =
3.998 kg Jadi untuk jarak per / m' berat besi = 3.850 kg Jadi untuk jarak per / m' berat besi
Bentang
Tumpuan Kanan Total Berat
Lisplang V. Btn 0.55 L. Bek

Besi skng 10 43.28


Besi utama 10 69.24
Besi torsi 10 0.00

total = 0.080 m
total = 11.920 m

= 12.000 m

= 240.000 m
= 148.08 kg
= 6.317 kg 6.317
Bentang = 11.0 69.24

total = 0.080 m
total = 11.920 m

= 12.000 m

= 0.000 m
= 0 kg
= 0.000 kg 0.000
Bentang = 11.0 0.00
total = 0.080 m
total = 0.120 m
total = 0.880 m

total = 1.080 m

6
= 3.998 kg 3.949
Bentang = 11.0 43.28

Tumpuan Kanan Total Berat


Lisplang V. Btn 2.63 L. Bek

Besi skng 10 207.31


Besi utama 10 331.66 TOTAL 3.17
Besi torsi 10 0.00

total = 0.080 m
total = 11.920 m

= 12.000 m

= 240.000 m
= 148.08 kg
= 6.317 kg 6.317
Bentang = 52.5 331.66

total = 0.080 m
total = 11.920 m

= 12.000 m

= 0.000 m
= 0 kg
= 0.000 kg 0.000
Bentang = 52.5 0.00
total = 0.080 m
total = 0.120 m
total = 0.880 m
total = 1.080 m

6
= 3.998 kg 3.949
Bentang = 52.5 207.31
skng tengah utama
10.96 10 43.28 10 0.00 10 69.24 PJG BALOK 10.960
skng tengah utama
52.50 10 207.31 10 0.00 10 331.66 PJG BALOK 52.500

63.46 250.59 - 400.90


BALOK BETON ELEVASI + 3.000 NO
A BALOK B - 1 Lihat Gambar
L Total = 10.06 m 1
B A 0.35 m
B 0.15 m
(juml Tul ats & bwh) tump kiri 6 bh
(Tul Utama) lap 6 bh
tump kanan 6 bh
besi dia 13 mm
(Tul Tengah) engah) jumlah 0 bh
besi dia 10 mm a
(Tul Sengkang) besi dia jarak
tump kiri 10 - 150 mm
lap 10 - 150 mm
tump kanan 10 - 150 mm

c
BALOK BETON ELEVASI + 3.000 NO
A BALOK B - 1' Lihat Gambar
L Total = 6.30 m 1
B A 0.55 m
B 0.20 m
(juml Tul ats & bwh) tump kiri 6 bh
(Tul Utama) lap 6 bh
tump kanan 6 bh
besi dia 13 mm
(Tul Tengah) engah) jumlah 1 bh
besi dia 10 mm a
(Tul Sengkang) besi dia jarak
tump kiri 10 - 100 mm
lap 10 - 100 mm
tump kanan 10 - 100 mm

c
BALOK BETON ELEVASI + 3.500 NO
A BALOK B - 2 Lihat Gambar
L Total = 40.00 m 1
B A 0.30 m
B 0.20 m
(juml Tul ats & bwh) tump kiri 5 bh
(Tul Utama) lap 5 bh
tump kanan 5 bh
besi dia 13 mm
(Tul Tengah) engah) jumlah 0 bh
besi dia 10 mm a
(Tul Sengkang) besi dia jarak
tump kiri 10 - 150 mm
lap 10 - 150 mm
tump kanan 10 - 150 mm

b
c

BALOK BETON ELEVASI + 4.000 NO


A BALOK -B-1 Lihat Gambar
L Total = 81.42 m 1
B A 0.35 m
B 0.15 m
(juml Tul ats & bwh) tump kiri 6 bh
(Tul Utama) lap 6 bh
tump kanan 6 bh
besi dia 13 mm
(Tul Tengah) engah) jumlah 0 bh
besi dia 10 mm a
(Tul Sengkang) besi dia jarak
tump kiri 10 - 100 mm
lap 10 - 100 mm
tump kanan 10 - 100 mm

b
c

BALOK BETON ELEVASI + 4.000 NO


A BALOK -B-1' Lihat Gambar
L Total = 30.00 m 1
B A 0.45 m
B 0.20 m
(juml Tul ats & bwh) tump kiri 6 bh
(Tul Utama) lap 6 bh
tump kanan 6 bh
besi dia 13 mm
(Tul Tengah) engah) jumlah 2 bh
besi dia 10 mm a
(Tul Sengkang) besi dia jarak
tump kiri 10 - 100 mm
lap 10 - 100 mm
tump kanan 10 - 100 mm

b
c

BALOK BETON ELEVASI + 4.850 NO


A BALOK -BP-1 Lihat Gambar
L Total = 40.00 m 1
B A 0.20 m
B 0.15 m
(juml Tul ats & bwh) tump kiri 4 bh
(Tul Utama) lap 4 bh
tump kanan 4 bh
besi dia 10 mm
(Tul Tengah) engah) jumlah 0 bh
besi dia 10 mm a
(Tul Sengkang) besi dia jarak
tump kiri 8 - 150 mm
lap 8 - 150 mm
tump kanan 8 - 150 mm
b

c
B
Jenis Balok Tumpuan Kiri

BALOK B - 1 Lihat Gambar L Total = 10.06 m


30-Dec Beton A = 0.35 m Luas Total =

A B = 0.15 m
Bekisting A bkst = 0.70 m Panjang Total =
B
As Lihat Gambar
Pembesian

(Tul Utama)
(juml Tul ats & bwh) tump kiri 6
tump kanan 6 a = 0.052 m a total =
lap 6 b = 11.896 m b total =
a Besi D 13 W = 1.043 kg
L =
b c = 0.520 m
d = 11.376 m
L2 =
=
Jadi untuk jarak per / m' berat besi =

(Tul Tengah) jumlah 0


besi dia 10 a = 0.040 m a total =
b = 11.920 m b total =
a W = 0.617 kg
L =
b c = 0.400 m
d = 11.520 m
L2 =
=
Jadi untuk jarak per / m' berat besi =

(Tul Sengkang) dia tump kiri 10 - 150 a = 0.040 m a total =


dia tump kanan 10 - 150 b = 0.090 m b total =
la 10 - 150 c = 0.290 m c total =
c W = 0.617 kg
350 A L total =
a
b n = 6.267 + 1 = 8
150 Jadi untuk jarak per / m' berat besi =
B

B
Jenis Balok Tumpuan Kiri

BALOK B - 1' Lihat Gambar L Total = 6.30 m


30-Dec Beton A = 0.55 m Luas Total =

A B = 0.20 m
Bekisting A bkst = 1.10 m Panjang Total =
B
As Lihat Gambar
Pembesian

(Tul Utama)
(juml Tul ats & bwh) tump kiri 6
tump kanan 6 a = 0.052 m a total =
lap 6 b = 11.896 m b total =
a Besi D 13 W = 1.043 kg
L =
b c = 0.520 m
d = 11.376 m
L2 =
=
Jadi untuk jarak per / m' berat besi =

(Tul Tengah) jumlah 1


besi dia 10 a = 0.040 m a total =
b = 11.920 m b total =
a W = 0.617 kg
L =
b c = 0.400 m
d = 11.520 m
L2 =
=
Jadi untuk jarak per / m' berat besi =

(Tul Sengkang) dia tump kiri 10 - 100 a = 0.040 m a total =


dia tump kanan 10 - 100 b = 0.140 m b total =
la 10 - 100 c = 0.490 m c total =
c W = 0.617 kg
550 A L total =
a
b n = 9.400 + 1 = 11
200 Jadi untuk jarak per / m' berat besi =
B

B
Jenis Balok Tumpuan Kiri

BALOK B - 2 Lihat Gambar L Total = 40.00 m


30-Dec Beton A = 0.30 m Luas Total =

A B = 0.20 m
Bekisting A bkst = 0.60 m Panjang Total =
B
As Lihat Gambar
Pembesian

(Tul Utama)
(juml Tul ats & bwh) tump kiri 5
tump kanan 5 a = 0.052 m a total =
lap 5 b = 11.896 m b total =
a Besi D 13 W = 1.043 kg
L =
b c = 0.520 m
d = 11.376 m
L2 =
=
Jadi untuk jarak per / m' berat besi =

(Tul Tengah) jumlah 0


besi dia 10 a = 0.040 m a total =
b = 11.920 m b total =
a W = 0.617 kg
L =
b c = 0.400 m
d = 11.520 m
L2 =
=
Jadi untuk jarak per / m' berat besi =
(Tul Sengkang) dia tump kiri 10 - 150 a = 0.040 m a total =
dia tump kanan 10 - 150 b = 0.140 m b total =
la 10 - 150 c = 0.240 m c total =
c W = 0.617 kg
300 A L total =
a
b n = 6.267 + 1 = 8
200 Jadi untuk jarak per / m' berat besi =
B

B
Jenis Balok Tumpuan Kiri

BALOK -B-1 Lihat Gambar L Total = 81.42 m


30-Dec Beton A = 0.35 m Luas Total =

A B = 0.15 m
Bekisting A bkst = 0.70 m Panjang Total =
B
As Lihat Gambar
Pembesian

(Tul Utama)
(juml Tul ats & bwh) tump kiri 6
tump kanan 6 a = 0.052 m a total =
lap 6 b = 11.896 m b total =
a Besi D 13 W = 1.043 kg
L =
b c = 0.520 m
d = 11.376 m
L2 =
=
Jadi untuk jarak per / m' berat besi =

(Tul Tengah) jumlah 0


besi dia 10 a = 0.040 m a total =
b = 11.920 m b total =
a W = 0.617 kg
L =
b c = 0.400 m
d = 11.520 m
L2 =
=
Jadi untuk jarak per / m' berat besi =

(Tul Sengkang) dia tump kiri 10 - 100 a = 0.040 m a total =


dia tump kanan 10 - 100 b = 0.090 m b total =
la 10 - 100 c = 0.290 m c total =
c W = 0.617 kg
350 A L total =
a
b n = 9.400 + 1 = 11
150 Jadi untuk jarak per / m' berat besi =
B

B
Jenis Balok Tumpuan Kiri

BALOK -B-1' Lihat Gambar L Total = 30.00 m


30-Dec Beton A = 0.45 m Luas Total =

A B = 0.20 m
Bekisting A bkst = 0.90 m Panjang Total =
B
As Lihat Gambar
Pembesian

(Tul Utama)
(juml Tul ats & bwh) tump kiri 6
tump kanan 6 a = 0.052 m a total =
lap 6 b = 11.896 m b total =
a Besi D 13 W = 1.043 kg
L =
b c = 0.520 m
d = 11.376 m
L2 =
=
Jadi untuk jarak per / m' berat besi =

(Tul Tengah) jumlah 2


besi dia 10 a = 0.040 m a total =
b = 11.920 m b total =
a W = 0.617 kg
L =
b c = 0.400 m
d = 11.520 m
L2 =
=
Jadi untuk jarak per / m' berat besi =

(Tul Sengkang) dia tump kiri 10 - 100 a = 0.040 m a total =


dia tump kanan 10 - 100 b = 0.140 m b total =
la 10 - 100 c = 0.390 m c total =
c W = 0.617 kg
450 A L total =
a
b n = 9.400 + 1 = 11
200 Jadi untuk jarak per / m' berat besi =
B

B
Jenis Balok Tumpuan Kiri

BALOK -BP-1 Lihat Gambar L Total = 40.00 m


30-Dec Beton A = 0.20 m Luas Total =

A B = 0.15 m
Bekisting A bkst = 0.40 m Panjang Total =
B
As Lihat Gambar
Pembesian

(Tul Utama)
(juml Tul ats & bwh) tump kiri 4
tump kanan 4 a = 0.040 m a total =
lap 4 b = 11.920 m b total =
a Besi D 10 W = 0.617 kg
L =
b c = 0.400 m
d = 11.520 m
L2 =
=
Jadi untuk jarak per / m' berat besi =

(Tul Tengah) jumlah 0


besi dia 10 a = 0.040 m a total =
b = 11.920 m b total =
a W = 0.617 kg
L =
b c = 0.400 m
d = 11.520 m
L2 =
=
Jadi untuk jarak per / m' berat besi =

(Tul Sengkang) dia tump kiri 8 - 150 a = 0.032 m a total =


dia tump kanan 8 - 150 b = 0.090 m b total =
la 8 - 150 c = 0.140 m c total =
c W = 0.395 kg
200 A L total =
a
b n = 6.267 + 1 = 8
150 Jadi untuk jarak per / m' berat besi =
B
ri Tumpuan Lapangan Tumpuan Kanan

0.05 m2 V. Beton = 0.53 m3 Total berat Besi =

0.70 m' L. Bekisting = 7.04 m2

0.104 m a = 0.052 m a total = 0.104 m a = 0.052 m a


11.896 m b = 11.896 m b total = 11.896 m b = 11.896 m b
W = 1.043 kg W = 1.043 kg
12.000 m L = 12.000 m L
c = 0.520 m c = 0.520 m
d = 11.376 m d = 11.376 m
144.000 m L2 = 144.000 m L2
150.15312 kg = 150.15312 kg
6.452 kg Jadi untuk jarak per / m' berat besi = 6.452 kg Jadi untuk jarak per / m' berat besi
Bentang

0.080 m a = 0.040 m a total = 0.080 m a = 0.040 m a


11.920 m b = 11.920 m b total = 11.920 m b = 11.920 m b
W = 0.617 kg W = 0.617 kg
12.000 m L = 12.000 m L
c = 0.400 m c = 0.400 m
d = 11.520 m d = 11.520 m
0.000 m L2 = 0.000 m L2
0 kg = 0 kg
0.000 kg Jadi untuk jarak per / m' berat besi = 0.000 kg Jadi untuk jarak per / m' berat besi
Bentang
0.080 m a = 0.040 m a total = 0.080 m a = 0.040 m a
0.270 m b = 0.090 m b total = 0.180 m b = 0.090 m b
0.580 m c = 0.290 m c total = 0.580 m c = 0.290 m c
W = 0.617 kg W = 0.617 kg
0.930 m L total = 0.840 m L

n = 6.267 + 1 = 8 n = 6.267 + 1 =
4.590 kg Jadi untuk jarak per / m' berat besi = 4.146 kg Jadi untuk jarak per / m' berat besi
Bentang

ri Tumpuan Lapangan Tumpuan Kanan

0.11 m2 V. Beton = 0.69 m3 Total berat Besi =

1.10 m' L. Bekisting = 6.93 m2

0.104 m a = 0.052 m a total = 0.104 m a = 0.052 m a


11.896 m b = 11.896 m b total = 11.896 m b = 11.896 m b
W = 1.043 kg W = 1.043 kg
12.000 m L = 12.000 m L
c = 0.520 m c = 0.520 m
d = 11.376 m d = 11.376 m
144.000 m L2 = 144.000 m L2
150.15312 kg = 150.15312 kg
6.452 kg Jadi untuk jarak per / m' berat besi = 6.452 kg Jadi untuk jarak per / m' berat besi
Bentang

0.080 m a = 0.040 m a total = 0.080 m a = 0.040 m a


11.920 m b = 11.920 m b total = 11.920 m b = 11.920 m b
W = 0.617 kg W = 0.617 kg
12.000 m L = 12.000 m L
c = 0.400 m c = 0.400 m
d = 11.520 m d = 11.520 m
24.000 m L2 = 24.000 m L2
14.808 kg = 14.808 kg
0.632 kg Jadi untuk jarak per / m' berat besi = 0.632 kg Jadi untuk jarak per / m' berat besi
Bentang
0.080 m a = 0.040 m a total = 0.080 m a = 0.040 m a
0.420 m b = 0.140 m b total = 0.280 m b = 0.140 m b
0.980 m c = 0.490 m c total = 0.980 m c = 0.490 m c
W = 0.617 kg W = 0.617 kg
1.480 m L total = 1.340 m L

n = 9.400 + 1 = 11 n = 9.400 + 1 =
10.045 kg Jadi untuk jarak per / m' berat besi = 9.095 kg Jadi untuk jarak per / m' berat besi
Bentang

ri Tumpuan Lapangan Tumpuan Kanan

0.06 m2 V. Beton = 2.40 m3 Total berat Besi =

0.60 m' L. Bekisting = 24.00 m2

0.104 m a = 0.052 m a total = 0.104 m a = 0.052 m a


11.896 m b = 11.896 m b total = 11.896 m b = 11.896 m b
W = 1.043 kg W = 1.043 kg
12.000 m L = 12.000 m L
c = 0.520 m c = 0.520 m
d = 11.376 m d = 11.376 m
120.000 m L2 = 120.000 m L2
125.1276 kg = 125.1276 kg
5.377 kg Jadi untuk jarak per / m' berat besi = 5.377 kg Jadi untuk jarak per / m' berat besi
Bentang

0.080 m a = 0.040 m a total = 0.080 m a = 0.040 m a


11.920 m b = 11.920 m b total = 11.920 m b = 11.920 m b
W = 0.617 kg W = 0.617 kg
12.000 m L = 12.000 m L
c = 0.400 m c = 0.400 m
d = 11.520 m d = 11.520 m
0.000 m L2 = 0.000 m L2
0 kg = 0 kg
0.000 kg Jadi untuk jarak per / m' berat besi = 0.000 kg Jadi untuk jarak per / m' berat besi
Bentang
0.080 m a = 0.040 m a total = 0.080 m a = 0.040 m a
0.420 m b = 0.140 m b total = 0.280 m b = 0.140 m b
0.480 m c = 0.240 m c total = 0.480 m c = 0.240 m c
W = 0.617 kg W = 0.617 kg
0.980 m L total = 0.840 m L

n = 6.267 + 1 = 8 n = 6.267 + 1 =
4.837 kg Jadi untuk jarak per / m' berat besi = 4.146 kg Jadi untuk jarak per / m' berat besi
Bentang

ri Tumpuan Lapangan Tumpuan Kanan

0.05 m2 V. Beton = 4.27 m3 Total berat Besi =

0.70 m' L. Bekisting = 56.99 m2

0.104 m a = 0.052 m a total = 0.104 m a = 0.052 m a


11.896 m b = 11.896 m b total = 11.896 m b = 11.896 m b
W = 1.043 kg W = 1.043 kg
12.000 m L = 12.000 m L
c = 0.520 m c = 0.520 m
d = 11.376 m d = 11.376 m
144.000 m L2 = 144.000 m L2
150.15312 kg = 150.15312 kg
6.452 kg Jadi untuk jarak per / m' berat besi = 6.452 kg Jadi untuk jarak per / m' berat besi
Bentang

0.080 m a = 0.040 m a total = 0.080 m a = 0.040 m a


11.920 m b = 11.920 m b total = 11.920 m b = 11.920 m b
W = 0.617 kg W = 0.617 kg
12.000 m L = 12.000 m L
c = 0.400 m c = 0.400 m
d = 11.520 m d = 11.520 m
0.000 m L2 = 0.000 m L2
0 kg = 0 kg
0.000 kg Jadi untuk jarak per / m' berat besi = 0.000 kg Jadi untuk jarak per / m' berat besi
Bentang
0.080 m a = 0.040 m a total = 0.080 m a = 0.040 m a
0.270 m b = 0.090 m b total = 0.180 m b = 0.090 m b
0.580 m c = 0.290 m c total = 0.580 m c = 0.290 m c
W = 0.617 kg W = 0.617 kg
0.930 m L total = 0.840 m L

n = 9.400 + 1 = 11 n = 9.400 + 1 =
6.312 kg Jadi untuk jarak per / m' berat besi = 5.701 kg Jadi untuk jarak per / m' berat besi
Bentang

ri Tumpuan Lapangan Tumpuan Kanan

0.09 m2 V. Beton = 2.70 m3 Total berat Besi =

0.90 m' L. Bekisting = 27.00 m2

0.104 m a = 0.052 m a total = 0.104 m a = 0.052 m a


11.896 m b = 11.896 m b total = 11.896 m b = 11.896 m b
W = 1.043 kg W = 1.043 kg
12.000 m L = 12.000 m L
c = 0.520 m c = 0.520 m
d = 11.376 m d = 11.376 m
144.000 m L2 = 144.000 m L2
150.15312 kg = 150.15312 kg
6.452 kg Jadi untuk jarak per / m' berat besi = 6.452 kg Jadi untuk jarak per / m' berat besi
Bentang
0.080 m a = 0.040 m a total = 0.080 m a = 0.040 m a
11.920 m b = 11.920 m b total = 11.920 m b = 11.920 m b
W = 0.617 kg W = 0.617 kg
12.000 m L = 12.000 m L
c = 0.400 m c = 0.400 m
d = 11.520 m d = 11.520 m
48.000 m L2 = 48.000 m L2
29.616 kg = 29.616 kg
1.263 kg Jadi untuk jarak per / m' berat besi = 1.263 kg Jadi untuk jarak per / m' berat besi
Bentang
0.080 m a = 0.040 m a total = 0.080 m a = 0.040 m a
0.420 m b = 0.140 m b total = 0.280 m b = 0.140 m b
0.780 m c = 0.390 m c total = 0.780 m c = 0.390 m c
W = 0.617 kg W = 0.617 kg
1.280 m L total = 1.140 m L

n = 9.400 + 1 = 11 n = 9.400 + 1 =
8.687 kg Jadi untuk jarak per / m' berat besi = 7.737 kg Jadi untuk jarak per / m' berat besi
Bentang

ri Tumpuan Lapangan Tumpuan Kanan

0.03 m2 V. Beton = 1.20 m3 Total berat Besi =

0.40 m' L. Bekisting = 16.00 m2

0.080 m a = 0.040 m a total = 0.080 m a = 0.040 m a


11.920 m b = 11.920 m b total = 11.920 m b = 11.920 m b
W = 0.617 kg W = 0.617 kg
12.000 m L = 12.000 m L
c = 0.400 m c = 0.400 m
d = 11.520 m d = 11.520 m
96.000 m L2 = 96.000 m L2
59.232 kg = 59.232 kg
2.527 kg Jadi untuk jarak per / m' berat besi = 2.527 kg Jadi untuk jarak per / m' berat besi
Bentang

0.080 m a = 0.040 m a total = 0.080 m a = 0.040 m a


11.920 m b = 11.920 m b total = 11.920 m b = 11.920 m b
W = 0.617 kg W = 0.617 kg
12.000 m L = 12.000 m L
c = 0.400 m c = 0.400 m
d = 11.520 m d = 11.520 m
0.000 m L2 = 0.000 m L2
0 kg = 0 kg
0.000 kg Jadi untuk jarak per / m' berat besi = 0.000 kg Jadi untuk jarak per / m' berat besi
Bentang
0.064 m a = 0.032 m a total = 0.064 m a = 0.032 m a
0.270 m b = 0.090 m b total = 0.180 m b = 0.090 m b
0.280 m c = 0.140 m c total = 0.280 m c = 0.140 m c
W = 0.395 kg W = 0.395 kg
0.614 m L total = 0.524 m L

n = 6.267 + 1 = 8 n = 6.267 + 1 =
1.940 kg Jadi untuk jarak per / m' berat besi = 1.655 kg Jadi untuk jarak per / m' berat besi
Bentang
BALOK BETON ELEVASI + 3.000
Tumpuan Kanan Total Berat
BALOK B - 1 V. Btn 0.53

Besi skng 10 44.69


Besi utama 13 64.91
Besi torsi 10 0.00

total = 0.104 m
total = 11.896 m

= 12.000 m

= 144.000 m
= 150.15312 kg
= 6.452 kg 6.452
Bentang = 10.1 64.91

total = 0.080 m
total = 11.920 m

= 12.000 m

= 0.000 m
= 0 kg
= 0.000 kg 0.000
Bentang = 10.1 0.00
total = 0.080 m
total = 0.270 m
total = 0.580 m

total = 0.930 m

8
= 4.590 kg 4.442
Bentang = 10.1 44.69

BALOK BETON ELEVASI + 3.000


Tumpuan Kanan Total Berat
BALOK B - 1' V. Btn 0.69

Besi skng 10 61.29


Besi utama 13 40.65
Besi torsi 10 3.98

total = 0.104 m
total = 11.896 m

= 12.000 m

= 144.000 m
= 150.15312 kg
= 6.452 kg 6.452
Bentang = 6.3 40.65

total = 0.080 m
total = 11.920 m

= 12.000 m

= 24.000 m
= 14.808 kg
= 0.632 kg 0.632
Bentang = 6.3 3.98
total = 0.080 m
total = 0.420 m
total = 0.980 m
total = 1.480 m

11
= 10.045 kg 9.728
Bentang = 6.3 61.29

BALOK BETON ELEVASI + 3.500


Tumpuan Kanan Total Berat
BALOK B - 2 V. Btn 2.40

Besi skng 10 184.28


Besi utama 13 215.07
Besi torsi 10 0.00

total = 0.104 m
total = 11.896 m

= 12.000 m

= 120.000 m
= 125.1276 kg
= 5.377 kg 5.377
Bentang = 40.0 215.07

total = 0.080 m
total = 11.920 m

= 12.000 m

= 0.000 m
= 0 kg
= 0.000 kg 0.000
Bentang = 40.0 0.00
total = 0.080 m
total = 0.420 m
total = 0.480 m

total = 0.980 m

8
= 4.837 kg 4.607
Bentang = 40.0 184.28

BALOK BETON ELEVASI + 4.000


Tumpuan Kanan Total Berat
BALOK -B-1 V. Btn 4.27

Besi skng 10 497.34


Besi utama 13 525.33
Besi torsi 10 0.00

total = 0.104 m
total = 11.896 m

= 12.000 m

= 144.000 m
= 150.15312 kg
= 6.452 kg 6.452
Bentang = 81.4 525.33

total = 0.080 m
total = 11.920 m

= 12.000 m
= 0.000 m
= 0 kg
= 0.000 kg 0.000
Bentang = 81.4 0.00
total = 0.080 m
total = 0.270 m
total = 0.580 m

total = 0.930 m

11
= 6.312 kg 6.108
Bentang = 81.4 497.34

BALOK BETON ELEVASI + 4.000


Tumpuan Kanan Total Berat
BALOK -B-1' V. Btn 2.70

Besi skng 10 251.12


Besi utama 13 193.56
Besi torsi 10 37.90

total = 0.104 m
total = 11.896 m

= 12.000 m

= 144.000 m
= 150.15312 kg
= 6.452 kg 6.452
Bentang = 30.0 193.56
total = 0.080 m
total = 11.920 m

= 12.000 m

= 48.000 m
= 29.616 kg
= 1.263 kg 1.263
Bentang = 30.0 37.90
total = 0.080 m
total = 0.420 m
total = 0.780 m

total = 1.280 m

11
= 8.687 kg 8.371
Bentang = 30.0 251.12

BALOK BETON ELEVASI + 4.850


Tumpuan Kanan Total Berat
BALOK -BP-1 V. Btn 1.20

Besi skng 8 73.80


Besi utama 10 101.08 TOTAL 11.80
Besi torsi 10 0.00

total = 0.080 m
total = 11.920 m

= 12.000 m

= 96.000 m
= 59.232 kg
= 2.527 kg 2.527
Bentang = 40.0 101.08

total = 0.080 m
total = 11.920 m

= 12.000 m

= 0.000 m
= 0 kg
= 0.000 kg 0.000
Bentang = 40.0 0.00
total = 0.064 m
total = 0.270 m
total = 0.280 m

total = 0.614 m

8
= 1.940 kg 1.845
Bentang = 40.0 73.80
skng tengah utama
L. Bek 7.04 10 44.69 10 0.00 13 64.91 PJG BALOK
skng tengah utama
L. Bek 6.93 10 61.29 10 3.98 13 40.65 PJG BALOK
skng tengah utama
L. Bek 24.00 10 184.28 10 0.00 13 215.07 PJG BALOK
skng tengah utama
L. Bek 56.99 10 497.34 10 0.00 13 525.33 PJG BALOK
skng tengah utama
L. Bek 27.00 10 251.12 10 37.90 13 193.56 PJG BALOK
skng tengah utama
L. Bek 16.00 8 73.80 10 0.00 10 101.08 PJG BALOK

137.97 8 73.80
10 1,181.67
13 1,039.52
10.060
6.300
40.000
81.420
30.000
40.000
SLOOF BETON TB 1 NO
A SLOF TB1 Lihat Gambar
L Total = 103.79 m 1
B A 0.20 m
B 0.15 m
(juml Tul ats & bwh) tump kiri 4 bh
(Tul Utama) lap 4 bh
tump kanan 4 bh
besi dia 13 mm
(Tul Tengah) jumlah 0 bh
besi dia 10 mm a
(Tul Sengkang) besi dia jarak
tump kiri 10 - 150 mm
lap 10 - 150 mm
tump kanan 10 - 150 mm

103.79
Galian Tanah 34.2507
Urugan Tanah kembali 25.69
Urugan Pasir 3.63265
Lantai Kerja 1.816325

c
SLOOF BETON TB 1 NO
A SLOF TB1 Lihat Gambar
L Total = 98.78 m 1
B A 0.20 m
B 0.15 m
(juml Tul ats & bwh) tump kiri 4 bh
(Tul Utama) lap 4 bh
tump kanan 4 bh
besi dia 13 mm
(Tul Tengah) jumlah 0 bh
besi dia 10 mm a
(Tul Sengkang) besi dia jarak
tump kiri 10 - 150 mm
lap 10 - 150 mm
tump kanan 10 - 150 mm

c
B
Jenis Balok Tumpuan Kiri

SLOF TB1 Lihat Gambar L Total = 103.79 m


30-Dec Beton A = 0.20 m Luas Total =

A B = 0.15 m
Bekisting A bkst = 0.40 m Panjang Total =
B
As Lihat Gambar
Pembesian

(Tul Utama)
(juml Tul ats & bwh) tump kiri 4
tump kanan 4 a = 0.052 m a total =
lap 4 b = 11.896 m b total =
a Besi D 13 W = 1.043 kg
L =
b c = 0.520 m
d = 11.376 m
L2 =
=
Jadi untuk jarak per / m' berat besi =

(Tul Tengah) jumlah 0


besi dia 10 a = 0.040 m a total =
b = 11.920 m b total =
a W = 0.617 kg
L =
b c = 0.400 m
d = 11.520 m
L2 =
=
Jadi untuk jarak per / m' berat besi =

(Tul Sengkang) dia tump kiri 10 - 150 a = 0.040 m a total =


dia tump kanan 10 - 150 b = 0.090 m b total =
la 10 - 150 c = 0.140 m c total =
c W = 0.617 kg
200 A L total =
a
b n = 6.267 + 1 = 8
150 Jadi untuk jarak per / m' berat besi =
B

B
Jenis Balok Tumpuan Kiri

SLOF TB1 Lihat Gambar L Total = 98.78 m


30-Dec Beton A = 0.20 m Luas Total =

A B = 0.15 m
Bekisting A bkst = 0.40 m Panjang Total =
B
As Lihat Gambar
Pembesian

(Tul Utama)
(juml Tul ats & bwh) tump kiri 4
tump kanan 4 a = 0.052 m a total =
lap 4 b = 11.896 m b total =
a Besi D 13 W = 1.043 kg
L =
b c = 0.520 m
d = 11.376 m
L2 =
=
Jadi untuk jarak per / m' berat besi =

(Tul Tengah) jumlah 0


besi dia 10 a = 0.040 m a total =
b = 11.920 m b total =
a W = 0.617 kg
L =
b c = 0.400 m
d = 11.520 m
L2 =
=
Jadi untuk jarak per / m' berat besi =

(Tul Sengkang) dia tump kiri 10 - 150 a = 0.040 m a total =


dia tump kanan 10 - 150 b = 0.090 m b total =
la 10 - 150 c = 0.140 m c total =
c W = 0.617 kg
200 A L total =
a
b n = 6.267 + 1 = 8
150 Jadi untuk jarak per / m' berat besi =
B

B
ri Tumpuan Lapangan Tumpuan Kanan

0.03 m2 V. Beton = 3.11 m3 Total berat Besi =

0.40 m' L. Bekisting = 41.52 m2

0.104 m a = 0.052 m a total = 0.104 m a = 0.052 m a


11.896 m b = 11.896 m b total = 11.896 m b = 11.896 m b
W = 1.043 kg W = 1.043 kg
12.000 m L = 12.000 m L
c = 0.520 m c = 0.520 m
d = 11.376 m d = 11.376 m
96.000 m L2 = 96.000 m L2
100.10208 kg = 100.10208 kg
4.301 kg Jadi untuk jarak per / m' berat besi = 4.301 kg Jadi untuk jarak per / m' berat besi
Bentang

0.080 m a = 0.040 m a total = 0.080 m a = 0.040 m a


11.920 m b = 11.920 m b total = 11.920 m b = 11.920 m b
W = 0.617 kg W = 0.617 kg
12.000 m L = 12.000 m L
c = 0.400 m c = 0.400 m
d = 11.520 m d = 11.520 m
0.000 m L2 = 0.000 m L2
0 kg = 0 kg
0.000 kg Jadi untuk jarak per / m' berat besi = 0.000 kg Jadi untuk jarak per / m' berat besi
Bentang
0.080 m a = 0.040 m a total = 0.080 m a = 0.040 m a
0.270 m b = 0.090 m b total = 0.180 m b = 0.090 m b
0.280 m c = 0.140 m c total = 0.280 m c = 0.140 m c
W = 0.617 kg W = 0.617 kg
0.630 m L total = 0.540 m L

n = 6.267 + 1 = 8 n = 6.267 + 1 =
3.110 kg Jadi untuk jarak per / m' berat besi = 2.665 kg Jadi untuk jarak per / m' berat besi
Bentang

ri Tumpuan Lapangan Tumpuan Kanan

0.03 m2 V. Beton = 2.96 m3 Total berat Besi =

0.40 m' L. Bekisting = 39.51 m2

0.104 m a = 0.052 m a total = 0.104 m a = 0.052 m a


11.896 m b = 11.896 m b total = 11.896 m b = 11.896 m b
W = 1.043 kg W = 1.043 kg
12.000 m L = 12.000 m L
c = 0.520 m c = 0.520 m
d = 11.376 m d = 11.376 m
96.000 m L2 = 96.000 m L2
100.10208 kg = 100.10208 kg
4.301 kg Jadi untuk jarak per / m' berat besi = 4.301 kg Jadi untuk jarak per / m' berat besi
Bentang

0.080 m a = 0.040 m a total = 0.080 m a = 0.040 m a


11.920 m b = 11.920 m b total = 11.920 m b = 11.920 m b
W = 0.617 kg W = 0.617 kg
12.000 m L = 12.000 m L
c = 0.400 m c = 0.400 m
d = 11.520 m d = 11.520 m
0.000 m L2 = 0.000 m L2
0 kg = 0 kg
0.000 kg Jadi untuk jarak per / m' berat besi = 0.000 kg Jadi untuk jarak per / m' berat besi
Bentang
0.080 m a = 0.040 m a total = 0.080 m a = 0.040 m a
0.270 m b = 0.090 m b total = 0.180 m b = 0.090 m b
0.280 m c = 0.140 m c total = 0.280 m c = 0.140 m c
W = 0.617 kg W = 0.617 kg
0.630 m L total = 0.540 m L

n = 6.267 + 1 = 8 n = 6.267 + 1 =
3.110 kg Jadi untuk jarak per / m' berat besi = 2.665 kg Jadi untuk jarak per / m' berat besi
Bentang
Tumpuan Kanan Total Berat
SLOF TB1 V. Btn 3.11 L. Bek

Besi skng 10 307.38


Besi utama 13 446.44
Besi torsi 10 0.00

total = 0.104 m
total = 11.896 m

= 12.000 m

= 96.000 m
= 100.10208 kg
= 4.301 kg 4.301
Bentang = 103.8 446.44

total = 0.080 m
total = 11.920 m

= 12.000 m

= 0.000 m
= 0 kg
= 0.000 kg 0.000
Bentang = 103.8 0.00
total = 0.080 m
total = 0.270 m
total = 0.280 m

total = 0.630 m

8
= 3.110 kg 2.962
Bentang = 103.8 307.38

Tumpuan Kanan Total Berat


SLOF TB1 V. Btn 2.96 L. Bek

Besi skng 10 292.55


Besi utama 13 424.89 TOTAL 6.08
Besi torsi 10 0.00

total = 0.104 m
total = 11.896 m

= 12.000 m

= 96.000 m
= 100.10208 kg
= 4.301 kg 4.301
Bentang = 98.8 424.89

total = 0.080 m
total = 11.920 m

= 12.000 m

= 0.000 m
= 0 kg
= 0.000 kg 0.000
Bentang = 98.8 0.00
total = 0.080 m
total = 0.270 m
total = 0.280 m
total = 0.630 m

8
= 3.110 kg 2.962
Bentang = 98.8 292.55
skng tengah utama
41.52 10 307.38 10 0.00 13 446.44 PJG BALOK 103.790
skng tengah utama
39.51 10 292.55 10 0.00 13 424.89 PJG BALOK 98.780

81.03 599.93 - 871.33


PEKERJAAN RANGKA ATAP BANG.OPERASI

Pipa baja Ø 3" L = 4.87


L = 4.74
L = 8.68
L = 8.55
L = 0.92
L = 0.61
L = 10.00

Pipa baja Ø 2½" L = 0.20


L = 0.78
L = 0.25
L = 0.92

Balok Gording C 125 x 50 x 20 x 3,2 kg 6.13 kg/m L = 12.00

Plate 6 mm untuk dudukan Gording kg 48.610 kg/m2 = 0.009

Ikatan angin f 12 kg 0.888 kg/m L = 5.87


kg 0.888 kg/m L = 6.42

Trekstang f 10 kg 0.617 kg/m L = 1.2

Turn Buckle f 12 = 2

Base Plate 8 mm Pada kolom kg 64.931 kg/m2 = 0.04


kg 64.931 kg/m2 = 0.003

Baut Ø 12 mm ( Pada Gording ) = 1.00

Angkur f 12 mm L = 400 mm ( Kolom Beton ) = 4.00


Cat Rangka Atap ( Pipa dan Gording ) m 125.110 0.252 31.48
m 62.960 0.204 12.87
m 180.000 0.45 81.00
TOTAL 125.35
m n = 3 bh Volume Total = 14.61 m
m n = 3 bh Volume Total = 14.22 m
m n = 3 bh Volume Total = 26.04 m
m n = 3 bh Volume Total = 25.65 m
m n = 3 bh Volume Total = 2.76 m
m n = 3 bh Volume Total = 1.83 m
m n = 4 bh Volume Total = 40.00 m
Volume Total = 125.11 m

m n = 39 bh Volume Total = 7.80 m


m n = 42 bh Volume Total = 32.76 m
m n = 16 bh Volume Total = 4.00 m
m n = 20 bh Volume Total = 18.40 m
Volume Total = 62.96 m

m n = 15 bh Volume Total = 1,104.00 kg


Volume Total = 1,104.00 kg

m2 n = 45 bh Volume Total = 19.69 kg


Volume Total = 19.69 kg

m n = 4 bh Volume Total = 20.85 kg


m n = 2 bh Volume Total = 11.40 kg
Volume Total = 32.25 kg

m n = 56 bh Volume Total = 41.46 kg


Volume Total = 41.46 kg

bh n = 3 bh Volume Total = 6.00 bh

m2 n = 6 bh Volume Total = 15.58 kg


m2 n = 24 bh Volume Total = 3.90 kg
Volume Total = 19.48 kg

bh n = 45 bh Volume Total = 45.00 bh


Volume Total = 45.00 bh

bh n = 6 bh Volume Total = 24.00 bh


m2
m2
m2
m2

Anda mungkin juga menyukai