Jumlah Harga
No Uraian Pekerjaan
(Rp)
REKAPITULASI
TOTAL 2,826,591,771.52
PPn 10 % 282,659,177.15
TOTAL 3,109,250,948.68
DIBULATKAN 3,109,251,000.00
Terbilang :
TIGA MILYAR SERATUS SEMBILAN JUTA DUA RATUS LIMA PULUH SATU RIBU RUPIAH
SUMARIYANTO, A.Md
Penata TK.I (III/d) GALIH PRASETYA UTAMA, ST
NIP. 19680214 198903 1 003 Direktur
MENGETAHUI,
KEPALA SUBDIREKTORAT
PRASARANA BANDAR UDARA
ARY WINARNI
Pembina (IV/a)
NIP. 19690319 199403 2 001
KEMENTERIAN PERHUBUNGAN
DIREKTORAT JENDERAL PERHUBUNGAN UDARA
KANTOR UPBU MELALAN MELAK
Jalan Sendawar Raya I Telp: - Fax :
Kamp. Gemuhan Asa Email: bandaramelak@yahoo.com
Barong Tongkok Kutai Barat Web site: -
Kode Pos 75776
band
A TOTAL Rp 1,272,733,562.55
B PPN 10% Rp 127,273,356.26
C JUMLAH A+B Rp 1,400,006,918.81
D DIBULATKAN Rp 1,400,000,000.00
Terbilang :
SATU MILYAR EMPAT RATUS JUTA RUPIAH
MENGETAHUI,
KEPALA SUBDIREKTORAT
ARY WINARNI
Pembina (IV/a)
NIP. 19690319 199403 2 001
HARGA PERKIRAAN SENDIRI
I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 600.00 Ls Rp 17,850.00 Rp 10,710,000.00
2 Pengukuran Dan Pekerjaan Bowplank 68.00 m¹ Rp 102,200.00 Rp 6,949,600.00
IV PEKERJAAN ATAP
1 Pasang rangka atap baja ringan ( Zincalume ) 248.44 m2 Rp 353,100.00 Rp 87,724,164.00
2 Pasang atap genteng metal 248.44 m2 Rp 178,570.00 Rp 44,363,930.80
3 Pasang bubungan genteng metal 24.00 m1 Rp 115,870.00 Rp 2,780,880.00
4 Pasang listplank Fiber cement 0.8/10 cm & 1/25 cm 60.00 m1 Rp 45,590.00 Rp 2,735,400.00
I PEKERJAAN PERSIAPAN
II PEKERJAAN TANAH
PEKERJAAN PONDASI
IV STRUKTUR ATAS
9 Reforcement Bar
Dia 13 c a = 0.052 m
a
c = 0.940 m
W= 1.040
n1 = 6.267 +1 =
N = 20 Bh
Dia 13 a = 0.052 m
a b = 0.090 m
b c = 0.940 m
c W = 1.040
n1 = 6.267 +1 =
N = 20 Bh
a a = 0.052 m
b = 0.130 m
8 Dia 13 c = 1.460 m
c W = 1.040
n1 = 8.000 =
N = 20 Bh
b
Jadi untuk volume per / bh berat b
Total Berat Besi dia 13
300
Dia 10 a = 0.040 m
b = 0.240 m
300
W= 0.617
n1 = 8.267 +1 =
N = 20 Bh
Jadi untuk volume per / bh berat b
Total Berat Besi dia 10
= 5.421 m3
VolumeTotal = 108.41 m3
Volume 1= 3.500 m3
Volume 1= 0.117 m3
Volume 1= 12.000 m2
Volume 1= 1.560 m2
a total = 0.208 m
c total = 1.880 m
L1 total = 2.088 m
8
a total = 0.208 m
b total = 0.360 m
c total = 1.880 m
L1 total = 2.448 m
8
a total = 0.104 m
b total = 0.130 m
c total = 1.460 m
L1 total = 1.694 m
8
a total = 0.080 m
b total = 0.960 m
L1 total = 1.040 m
10
olume per / bh berat besi = 6.4 kg
Besi dia 10 = 128.34 kg
PERHITUNGAN VOLUME PONDASI BATU KALI
m3 A=
B=
B=
C=
200
600 C
1:04
a c=
c W=
n1 =
P L T M3
AS 1 - 2 ; B - E -
AS 7 - 8 ; B - D -
TOTAL - M3
P L T M3
AS 1 - 2 ; B - E -
AS 7 - 8 ; B - D -
TOTAL - M3
Pek. Urugan Tanah didatangkan dari luar area dikurangi Pek. Galian Tanah
0.25 m
0.20 m Luas Total = 0.05 m2 m3
0.70 m
0.10 m Luas Total = 0.07 m2 6.91 m3
0.20 m
0.05 m Luas Total = 0.01 m2 m3
0.30 m
0.60 m
0.60 m Luas Total = 0.27 m2 26.67 m3
0.20 m
0.30 m
Luas Total = 0.06 m2 m3
0.052 m a total = 0.104 m
LANTAI DASAR 4 BH
3 Reforcement Bar
Sengkang
10 - 150 kg a = 0.040 m a
150 b = 0.240 m b
300
W = 0.620 kg
L1
b L2
n1 = 6.667 +1 = 8.00
TOTAL BESI 10
Tulangan Pokok
8 D 13
a kg a = 0.052 m a
b = 11.896 m b
W = 1.042 kg
L2
c = 0.52 m
b d = 11.376 m
L2
BESI D 10 MM 82.95 Kg
BESI D 13 MM 138.24 kg
KOLOM BETON ( K-1 )
LANTAI DASAR 4 BH
3 Reforcement Bar
Sengkang
10 - 150 kg a = 0.040 m a
150 b = 0.240 m b
W = 0.620 kg
300 L1
L2
n1 = 6.667 +1 = 8.00
b
Jadi untuk jarak per / m' berat besi
Jadi jarak per / m' berat besi 10 ( Tumpuan )
TOTAL BESI 10
Tulangan Pokok
8 D 13
a kg a = 0.052 m a
b = 11.896 m b
W = 1.042 kg
L2
c = 0.52 m
b d = 11.376 m
L2
BESI D 10 MM 90.79 Kg
BESI D 13 MM 151.30 kg
LANTAI DASAR 2 BH
3 Reforcement Bar
Sengkang
10 - 150 kg a = 0.040 m a
150 b = 0.240 m b
W = 0.620 kg
300 L1
L2
n1 = 6.667 +1 = 8.00
b
Jadi untuk jarak per / m' berat besi
Jadi jarak per / m' berat besi 10 ( Tumpuan )
TOTAL BESI 10
Tulangan Pokok
8 D 13
a kg a = 0.052 m a
b = 11.896 m b
W = 1.042 kg
L2
c = 0.52 m
b d = 11.376 m
L2
BESI D 13 MM 58.46 kg
LANTAI DASAR 10 BH
3 Reforcement Bar
Sengkang
10 - 150 kg a = 0.040 m a
150 b = 0.240 m b
W = 0.620 kg
300 L1
L2
n1 = 6.667 +1 = 8.00
b
Jadi untuk jarak per / m' berat besi
Jadi jarak per / m' berat besi 10 ( Tumpuan )
TOTAL BESI 10
Tulangan Pokok
8 D 13
a kg a = 0.052 m a
b = 11.896 m b
W = 1.042 kg
L2
c = 0.52 m
b d = 11.376 m
L2
BESI D 10 MM 277.01 Kg
BESI D 13 MM 461.65 kg
LANTAI DASAR 4 BH
3 Reforcement Bar
Sengkang
10 - 150 kg a = 0.040 m a
150 b = 0.090 m b
c = 0.240 m b
W = 0.620 kg
150 L1
L2
n1 = 3.333 +1 = 5.00
.300
Jadi untuk jarak per / m' berat besi
Jadi jarak per / m' berat besi 10 ( Tumpuan )
TOTAL BESI 10
Tulangan Pokok
6 D 13
a kg a = 0.052 m a
b = 11.896 m b
W = 1.042 kg
L2
c = 0.52 m
b d = 11.376 m
L2
Jadi untuk jarak per / m' berat besi 13
c
TOTAL BESI 13
BESI D 10 MM 9.36 Kg
BESI D 13 MM 26.31 kg
3 Reforcement Bar
Sengkang
8 - 150 kg a = 0.032 m a
150 b = 0.360 m b
150 W = 0.395 kg
L1
L2
n1 = 6.267 +1 = 8.00
150
Jadi untuk jarak per / m' berat besi
Jadi jarak per / m' berat besi 8 ( Tumpuan )
TOTAL BESI 8
Tulangan Pokok
4 D 10
a kg a = 0.04 m a
b = 11.92 m b
W = 0.620 kg
L2
c = 0.4 m
b d = 11.52 m
b
L2
BESI D 8 MM 9.65 Kg
BESI D 10 MM 9.14 kg
3 Reforcement Bar
Sengkang
8 - 150 kg a = 0.032 m a
150 b = 0.240 m b
120 W = 0.395 kg
L1
L2
n1 = 6.267 +1 = 8.00
120
Jadi untuk jarak per / m' berat besi
Jadi jarak per / m' berat besi 8 ( Tumpuan )
TOTAL BESI 8
Tulangan Pokok
4 D 10
a kg a = 0.04 m a
b = 11.92 m b
W = 0.620 kg
L2
c = 0.4 m
b d = 11.52 m
L2
BESI D 8 MM 139.79 Kg
BESI D 10 MM 184.76 kg
3 Reforcement Bar
Sengkang
8 - 150 kg a = 0.032 m a
150 b = 0.240 m b
120 W = 0.395 kg
L1
L2
n1 = 6.267 +1 = 8.00
120
Jadi untuk jarak per / m' berat besi
Jadi jarak per / m' berat besi 8 ( Tumpuan )
TOTAL BESI 8
Tulangan Pokok
4 D 10
a kg a = 0.04 m a
b = 11.92 m b
W = 0.620 kg
L2
c = 0.4 m
b d = 11.52 m
L2
BESI D 10 MM 24.88 kg
Total = 0.090 m2 1.26 m3
16.800 m2
total = 0.080 m
total = 0.960 m
total = 1.040 m
total = 0.645 kg
= 5.16 kg
0 ( Tumpuan ) = 5.16 kg
total = 0.10 m
total = 11.90 m
= 12.00 m
= 192.00 m
= 200.06 kg
= 8.60 kg
18.624 m2
total = 0.080 m
total = 0.960 m
total = 1.040 m
total = 0.645 kg
= 5.16 kg
0 ( Tumpuan ) = 5.16 kg
total = 0.10 m
total = 11.90 m
= 12.00 m
= 192.00 m
= 200.06 kg
= 8.60 kg
6.912 m2
total = 0.080 m
total = 0.960 m
total = 1.040 m
total = 0.645 kg
= 5.16 kg
0 ( Tumpuan ) = 5.16 kg
total = 0.10 m
total = 11.90 m
= 12.00 m
= 192.00 m
= 200.06 kg
= 8.60 kg
58.200 m2
total = 0.080 m
total = 0.960 m
total = 1.040 m
total = 0.645 kg
= 5.16 kg
0 ( Tumpuan ) = 5.16 kg
total = 0.10 m
total = 11.90 m
= 12.00 m
= 192.00 m
= 200.06 kg
= 8.60 kg
1.800 m2
total = 0.080 m
total = 0.180 m
total = 0.480 m
total = 0.740 m
total = 0.459 kg
= 2.29 kg
0 ( Tumpuan ) = 2.29 kg
total = 0.10 m
total = 11.90 m
= 12.00 m
= 144.00 m
= 150.05 kg
= 6.45 kg
1.200 m2
total = 0.064 m
total = 0.360 m
total = 0.424 m
total = 0.167 m
= 1.34 kg
( Tumpuan ) = 2.68 kg
total = 0.08 m
total = 11.92 m
= 12.00 m
= 96.00 m
= 59.52 kg
= 2.54 kg
31.661 m2
total = 0.064 m
total = 0.240 m
total = 0.304 m
total = 0.120 m
= 0.96 kg
( Tumpuan ) = 1.92 kg
total = 0.08 m
total = 11.92 m
= 12.00 m
= 96.00 m
= 59.52 kg
= 2.54 kg
4.320 m2
total = 0.064 m
total = 0.240 m
total = 0.304 m
total = 0.120 m
= 0.96 kg
( Tumpuan ) = 1.92 kg
total = 0.08 m
total = 11.92 m
= 12.00 m
= 96.00 m
= 59.52 kg
= 2.54 kg
3 Reforcement Bar
Total 274 m2
3 Reforcement Bar
Total 14.12 m2
3 Reforcement Bar
Total 142.92 m2
0.120 m3 32.85 m3
17.9 m2
0.08 m
11.92 m
12.00 m
16.00 bh
385.280 m
237.52512 kg
10.099 kg 2,764.5 kg
0.08 m
11.92 m
12.00 m
16.00 bh
385.280 m
237.52512 kg
10.099 kg 2,764.5 kg
0.120 m3 1.69 m3
14.1 m2
0.08 m
11.92 m
12.00 m
16.00 bh
385.280 m
237.52512 kg
10.099 kg 142.6 kg
0.08 m
11.92 m
12.00 m
16.00 bh
385.280 m
237.52512 kg
10.099 kg 142.6 kg
0.120 m3 17.15 m3
142.9 m2
0.08 m
11.92 m
12.00 m
16.00 bh
385.280 m
237.52512 kg
10.099 kg 1,443.3 kg
0.08 m
11.92 m
12.00 m
16.00 bh
385.280 m
237.52512 kg
10.099 kg 1,443.3 kg
LISPLANG BETON ELEVASI + 3.000 NO
A Lisplang Lihat Gambar
L Total = 10.96 m 1
B A 0.50 m
B 0.10 m
(juml Tul ats & bwh) tump kiri 10 bh
(Tul Utama) lap 10 bh
tump kanan 10 bh
besi dia 10 mm
(Tul Tengah) h) jumlah 0 bh
besi dia 10 mm a
(Tul Sengkang) besi dia jarak
tump kiri 10 - 200 mm
lap 10 - 200 mm
tump kanan 10 - 200 mm
c
LISPLANG BETON ELEVASI + 4.000 NO
A Lisplang Lihat Gambar
L Total = 52.50 m 1
B A 0.50 m
B 0.10 m
(juml Tul ats & bwh) tump kiri 10 bh
(Tul Utama) lap 10 bh
tump kanan 10 bh
besi dia 10 mm
(Tul Tengah) h) jumlah 0 bh
besi dia 10 mm a
(Tul Sengkang) besi dia jarak
tump kiri 10 - 200 mm
lap 10 - 200 mm
tump kanan 10 - 200 mm
c
B
Jenis Balok Tumpuan Kiri
A B = 0.10 m
Bekisting A bkst = 1.00 m Panjang Total =
B
As Lihat Gambar
Pembesian
(Tul Utama)
(juml Tul ats & bwh) tump kiri 10
tump kanan 10 a = 0.040 m a total =
lap 10 b = 11.920 m b total =
a Besi D 10 W = 0.617 kg
L =
b c = 0.400 m
d = 11.520 m
L2 =
=
Jadi untuk jarak per / m' berat besi =
B
Jenis Balok Tumpuan Kiri
A B = 0.10 m
Bekisting A bkst = 1.00 m Panjang Total =
B
As Lihat Gambar
Pembesian
(Tul Utama)
(juml Tul ats & bwh) tump kiri 10
tump kanan 10 a = 0.040 m a total =
lap 10 b = 11.920 m b total =
a Besi D 10 W = 0.617 kg
L =
b c = 0.400 m
d = 11.520 m
L2 =
=
Jadi untuk jarak per / m' berat besi =
B
ri Tumpuan Lapangan Tumpuan Kanan
n = 4.700 + 1 = 6 n = 4.700 + 1 =
3.998 kg Jadi untuk jarak per / m' berat besi = 3.850 kg Jadi untuk jarak per / m' berat besi
Bentang
n = 4.700 + 1 = 6 n = 4.700 + 1 =
3.998 kg Jadi untuk jarak per / m' berat besi = 3.850 kg Jadi untuk jarak per / m' berat besi
Bentang
Tumpuan Kanan Total Berat
Lisplang V. Btn 0.55 L. Bek
total = 0.080 m
total = 11.920 m
= 12.000 m
= 240.000 m
= 148.08 kg
= 6.317 kg 6.317
Bentang = 11.0 69.24
total = 0.080 m
total = 11.920 m
= 12.000 m
= 0.000 m
= 0 kg
= 0.000 kg 0.000
Bentang = 11.0 0.00
total = 0.080 m
total = 0.120 m
total = 0.880 m
total = 1.080 m
6
= 3.998 kg 3.949
Bentang = 11.0 43.28
total = 0.080 m
total = 11.920 m
= 12.000 m
= 240.000 m
= 148.08 kg
= 6.317 kg 6.317
Bentang = 52.5 331.66
total = 0.080 m
total = 11.920 m
= 12.000 m
= 0.000 m
= 0 kg
= 0.000 kg 0.000
Bentang = 52.5 0.00
total = 0.080 m
total = 0.120 m
total = 0.880 m
total = 1.080 m
6
= 3.998 kg 3.949
Bentang = 52.5 207.31
skng tengah utama
10.96 10 43.28 10 0.00 10 69.24 PJG BALOK 10.960
skng tengah utama
52.50 10 207.31 10 0.00 10 331.66 PJG BALOK 52.500
c
BALOK BETON ELEVASI + 3.000 NO
A BALOK B - 1' Lihat Gambar
L Total = 6.30 m 1
B A 0.55 m
B 0.20 m
(juml Tul ats & bwh) tump kiri 6 bh
(Tul Utama) lap 6 bh
tump kanan 6 bh
besi dia 13 mm
(Tul Tengah) engah) jumlah 1 bh
besi dia 10 mm a
(Tul Sengkang) besi dia jarak
tump kiri 10 - 100 mm
lap 10 - 100 mm
tump kanan 10 - 100 mm
c
BALOK BETON ELEVASI + 3.500 NO
A BALOK B - 2 Lihat Gambar
L Total = 40.00 m 1
B A 0.30 m
B 0.20 m
(juml Tul ats & bwh) tump kiri 5 bh
(Tul Utama) lap 5 bh
tump kanan 5 bh
besi dia 13 mm
(Tul Tengah) engah) jumlah 0 bh
besi dia 10 mm a
(Tul Sengkang) besi dia jarak
tump kiri 10 - 150 mm
lap 10 - 150 mm
tump kanan 10 - 150 mm
b
c
b
c
b
c
c
B
Jenis Balok Tumpuan Kiri
A B = 0.15 m
Bekisting A bkst = 0.70 m Panjang Total =
B
As Lihat Gambar
Pembesian
(Tul Utama)
(juml Tul ats & bwh) tump kiri 6
tump kanan 6 a = 0.052 m a total =
lap 6 b = 11.896 m b total =
a Besi D 13 W = 1.043 kg
L =
b c = 0.520 m
d = 11.376 m
L2 =
=
Jadi untuk jarak per / m' berat besi =
B
Jenis Balok Tumpuan Kiri
A B = 0.20 m
Bekisting A bkst = 1.10 m Panjang Total =
B
As Lihat Gambar
Pembesian
(Tul Utama)
(juml Tul ats & bwh) tump kiri 6
tump kanan 6 a = 0.052 m a total =
lap 6 b = 11.896 m b total =
a Besi D 13 W = 1.043 kg
L =
b c = 0.520 m
d = 11.376 m
L2 =
=
Jadi untuk jarak per / m' berat besi =
B
Jenis Balok Tumpuan Kiri
A B = 0.20 m
Bekisting A bkst = 0.60 m Panjang Total =
B
As Lihat Gambar
Pembesian
(Tul Utama)
(juml Tul ats & bwh) tump kiri 5
tump kanan 5 a = 0.052 m a total =
lap 5 b = 11.896 m b total =
a Besi D 13 W = 1.043 kg
L =
b c = 0.520 m
d = 11.376 m
L2 =
=
Jadi untuk jarak per / m' berat besi =
B
Jenis Balok Tumpuan Kiri
A B = 0.15 m
Bekisting A bkst = 0.70 m Panjang Total =
B
As Lihat Gambar
Pembesian
(Tul Utama)
(juml Tul ats & bwh) tump kiri 6
tump kanan 6 a = 0.052 m a total =
lap 6 b = 11.896 m b total =
a Besi D 13 W = 1.043 kg
L =
b c = 0.520 m
d = 11.376 m
L2 =
=
Jadi untuk jarak per / m' berat besi =
B
Jenis Balok Tumpuan Kiri
A B = 0.20 m
Bekisting A bkst = 0.90 m Panjang Total =
B
As Lihat Gambar
Pembesian
(Tul Utama)
(juml Tul ats & bwh) tump kiri 6
tump kanan 6 a = 0.052 m a total =
lap 6 b = 11.896 m b total =
a Besi D 13 W = 1.043 kg
L =
b c = 0.520 m
d = 11.376 m
L2 =
=
Jadi untuk jarak per / m' berat besi =
B
Jenis Balok Tumpuan Kiri
A B = 0.15 m
Bekisting A bkst = 0.40 m Panjang Total =
B
As Lihat Gambar
Pembesian
(Tul Utama)
(juml Tul ats & bwh) tump kiri 4
tump kanan 4 a = 0.040 m a total =
lap 4 b = 11.920 m b total =
a Besi D 10 W = 0.617 kg
L =
b c = 0.400 m
d = 11.520 m
L2 =
=
Jadi untuk jarak per / m' berat besi =
n = 6.267 + 1 = 8 n = 6.267 + 1 =
4.590 kg Jadi untuk jarak per / m' berat besi = 4.146 kg Jadi untuk jarak per / m' berat besi
Bentang
n = 9.400 + 1 = 11 n = 9.400 + 1 =
10.045 kg Jadi untuk jarak per / m' berat besi = 9.095 kg Jadi untuk jarak per / m' berat besi
Bentang
n = 6.267 + 1 = 8 n = 6.267 + 1 =
4.837 kg Jadi untuk jarak per / m' berat besi = 4.146 kg Jadi untuk jarak per / m' berat besi
Bentang
n = 9.400 + 1 = 11 n = 9.400 + 1 =
6.312 kg Jadi untuk jarak per / m' berat besi = 5.701 kg Jadi untuk jarak per / m' berat besi
Bentang
n = 9.400 + 1 = 11 n = 9.400 + 1 =
8.687 kg Jadi untuk jarak per / m' berat besi = 7.737 kg Jadi untuk jarak per / m' berat besi
Bentang
n = 6.267 + 1 = 8 n = 6.267 + 1 =
1.940 kg Jadi untuk jarak per / m' berat besi = 1.655 kg Jadi untuk jarak per / m' berat besi
Bentang
BALOK BETON ELEVASI + 3.000
Tumpuan Kanan Total Berat
BALOK B - 1 V. Btn 0.53
total = 0.104 m
total = 11.896 m
= 12.000 m
= 144.000 m
= 150.15312 kg
= 6.452 kg 6.452
Bentang = 10.1 64.91
total = 0.080 m
total = 11.920 m
= 12.000 m
= 0.000 m
= 0 kg
= 0.000 kg 0.000
Bentang = 10.1 0.00
total = 0.080 m
total = 0.270 m
total = 0.580 m
total = 0.930 m
8
= 4.590 kg 4.442
Bentang = 10.1 44.69
total = 0.104 m
total = 11.896 m
= 12.000 m
= 144.000 m
= 150.15312 kg
= 6.452 kg 6.452
Bentang = 6.3 40.65
total = 0.080 m
total = 11.920 m
= 12.000 m
= 24.000 m
= 14.808 kg
= 0.632 kg 0.632
Bentang = 6.3 3.98
total = 0.080 m
total = 0.420 m
total = 0.980 m
total = 1.480 m
11
= 10.045 kg 9.728
Bentang = 6.3 61.29
total = 0.104 m
total = 11.896 m
= 12.000 m
= 120.000 m
= 125.1276 kg
= 5.377 kg 5.377
Bentang = 40.0 215.07
total = 0.080 m
total = 11.920 m
= 12.000 m
= 0.000 m
= 0 kg
= 0.000 kg 0.000
Bentang = 40.0 0.00
total = 0.080 m
total = 0.420 m
total = 0.480 m
total = 0.980 m
8
= 4.837 kg 4.607
Bentang = 40.0 184.28
total = 0.104 m
total = 11.896 m
= 12.000 m
= 144.000 m
= 150.15312 kg
= 6.452 kg 6.452
Bentang = 81.4 525.33
total = 0.080 m
total = 11.920 m
= 12.000 m
= 0.000 m
= 0 kg
= 0.000 kg 0.000
Bentang = 81.4 0.00
total = 0.080 m
total = 0.270 m
total = 0.580 m
total = 0.930 m
11
= 6.312 kg 6.108
Bentang = 81.4 497.34
total = 0.104 m
total = 11.896 m
= 12.000 m
= 144.000 m
= 150.15312 kg
= 6.452 kg 6.452
Bentang = 30.0 193.56
total = 0.080 m
total = 11.920 m
= 12.000 m
= 48.000 m
= 29.616 kg
= 1.263 kg 1.263
Bentang = 30.0 37.90
total = 0.080 m
total = 0.420 m
total = 0.780 m
total = 1.280 m
11
= 8.687 kg 8.371
Bentang = 30.0 251.12
total = 0.080 m
total = 11.920 m
= 12.000 m
= 96.000 m
= 59.232 kg
= 2.527 kg 2.527
Bentang = 40.0 101.08
total = 0.080 m
total = 11.920 m
= 12.000 m
= 0.000 m
= 0 kg
= 0.000 kg 0.000
Bentang = 40.0 0.00
total = 0.064 m
total = 0.270 m
total = 0.280 m
total = 0.614 m
8
= 1.940 kg 1.845
Bentang = 40.0 73.80
skng tengah utama
L. Bek 7.04 10 44.69 10 0.00 13 64.91 PJG BALOK
skng tengah utama
L. Bek 6.93 10 61.29 10 3.98 13 40.65 PJG BALOK
skng tengah utama
L. Bek 24.00 10 184.28 10 0.00 13 215.07 PJG BALOK
skng tengah utama
L. Bek 56.99 10 497.34 10 0.00 13 525.33 PJG BALOK
skng tengah utama
L. Bek 27.00 10 251.12 10 37.90 13 193.56 PJG BALOK
skng tengah utama
L. Bek 16.00 8 73.80 10 0.00 10 101.08 PJG BALOK
137.97 8 73.80
10 1,181.67
13 1,039.52
10.060
6.300
40.000
81.420
30.000
40.000
SLOOF BETON TB 1 NO
A SLOF TB1 Lihat Gambar
L Total = 103.79 m 1
B A 0.20 m
B 0.15 m
(juml Tul ats & bwh) tump kiri 4 bh
(Tul Utama) lap 4 bh
tump kanan 4 bh
besi dia 13 mm
(Tul Tengah) jumlah 0 bh
besi dia 10 mm a
(Tul Sengkang) besi dia jarak
tump kiri 10 - 150 mm
lap 10 - 150 mm
tump kanan 10 - 150 mm
103.79
Galian Tanah 34.2507
Urugan Tanah kembali 25.69
Urugan Pasir 3.63265
Lantai Kerja 1.816325
c
SLOOF BETON TB 1 NO
A SLOF TB1 Lihat Gambar
L Total = 98.78 m 1
B A 0.20 m
B 0.15 m
(juml Tul ats & bwh) tump kiri 4 bh
(Tul Utama) lap 4 bh
tump kanan 4 bh
besi dia 13 mm
(Tul Tengah) jumlah 0 bh
besi dia 10 mm a
(Tul Sengkang) besi dia jarak
tump kiri 10 - 150 mm
lap 10 - 150 mm
tump kanan 10 - 150 mm
c
B
Jenis Balok Tumpuan Kiri
A B = 0.15 m
Bekisting A bkst = 0.40 m Panjang Total =
B
As Lihat Gambar
Pembesian
(Tul Utama)
(juml Tul ats & bwh) tump kiri 4
tump kanan 4 a = 0.052 m a total =
lap 4 b = 11.896 m b total =
a Besi D 13 W = 1.043 kg
L =
b c = 0.520 m
d = 11.376 m
L2 =
=
Jadi untuk jarak per / m' berat besi =
B
Jenis Balok Tumpuan Kiri
A B = 0.15 m
Bekisting A bkst = 0.40 m Panjang Total =
B
As Lihat Gambar
Pembesian
(Tul Utama)
(juml Tul ats & bwh) tump kiri 4
tump kanan 4 a = 0.052 m a total =
lap 4 b = 11.896 m b total =
a Besi D 13 W = 1.043 kg
L =
b c = 0.520 m
d = 11.376 m
L2 =
=
Jadi untuk jarak per / m' berat besi =
B
ri Tumpuan Lapangan Tumpuan Kanan
n = 6.267 + 1 = 8 n = 6.267 + 1 =
3.110 kg Jadi untuk jarak per / m' berat besi = 2.665 kg Jadi untuk jarak per / m' berat besi
Bentang
n = 6.267 + 1 = 8 n = 6.267 + 1 =
3.110 kg Jadi untuk jarak per / m' berat besi = 2.665 kg Jadi untuk jarak per / m' berat besi
Bentang
Tumpuan Kanan Total Berat
SLOF TB1 V. Btn 3.11 L. Bek
total = 0.104 m
total = 11.896 m
= 12.000 m
= 96.000 m
= 100.10208 kg
= 4.301 kg 4.301
Bentang = 103.8 446.44
total = 0.080 m
total = 11.920 m
= 12.000 m
= 0.000 m
= 0 kg
= 0.000 kg 0.000
Bentang = 103.8 0.00
total = 0.080 m
total = 0.270 m
total = 0.280 m
total = 0.630 m
8
= 3.110 kg 2.962
Bentang = 103.8 307.38
total = 0.104 m
total = 11.896 m
= 12.000 m
= 96.000 m
= 100.10208 kg
= 4.301 kg 4.301
Bentang = 98.8 424.89
total = 0.080 m
total = 11.920 m
= 12.000 m
= 0.000 m
= 0 kg
= 0.000 kg 0.000
Bentang = 98.8 0.00
total = 0.080 m
total = 0.270 m
total = 0.280 m
total = 0.630 m
8
= 3.110 kg 2.962
Bentang = 98.8 292.55
skng tengah utama
41.52 10 307.38 10 0.00 13 446.44 PJG BALOK 103.790
skng tengah utama
39.51 10 292.55 10 0.00 13 424.89 PJG BALOK 98.780
Turn Buckle f 12 = 2