PERENCANAAN KOLOM
5.325
= 679 × 400 454 - = 12.258 kNm
2
MR = ф Mn = 1 12.258 = 9.807
Pu = V21 + V23
= 97.266 + 89.1822 0.3 × 0.5 - 0.11 × 5 × 24 = 200.67 kN
12
[(Ec × Ig)/5] 21019 × 3125000000 / 5 13.1369 × 10 12
EIb = = = = 8.513869 × 10
1 + βd 1 + 0.543 1.543
= 8513.869 kNm²
12
[(Ec × Ig)/2,5] 21019 × 3417187500 / 2.5 28.7304 × 10 12
EIX = = = = 18.61983 × 10
1 + βd 1 + 0.543 1.543
= 18619.83 kNm²
Untuk menentukan panjang tekuk dari kolom akan diterapkan dengan menggunakan grafik H.C
(tabel dan grafik perhitungan beton bertulang)
Kolom bawah = ф = 0 (terjepit penuh)
Kolom atas ф = [(EIX / Lk) / Eib]/Lb
MENENTUKAN TULANGAN
MU = 7.424 kN
PU = 200.668 kN
eperlu = 7.424 / 200.668 eminimum = 15 + 0.03 × 500
= 0.037 m = 30 mm < eperlu
= 37 mm
Pu 200.668
= = = 0.0090 (Arah Y)
ф . Agr . 0,85 . fc' 0.65 × 202500 × 0.85 × 20
et 37
= = 0.074
h 500
Pu et
= 0.0090 × 0.074 = 0.0007 (Arah X)
ф . Agr . 0,85 . fc' h
Diambil d' = 40
d' 40
= = 0.089
h 450
Dari grafik dan tabel perhitungan beton bertulang (terlampir) untuk :
fy = 400 mpa d'/h = 0.08889 r = 0.005 ( Dari Grafik )
fc' = 20 mpa β = 1
ρ = β.r = 1 × 0.005 = 0.0050
Astot = ρ . Agr = 0.0050 × 202500 = 1012.50 mm²
PERENCANAAN PONDASI
DATA PERENCANAAN P
Df = 1500 mm MT
Mu = 7.424 kN
Pu = 200.668 kN
H = 14.247
1500
beton = 2400 Kg/m³
24 kN/m³
t= 16 kN/m³ 16
tanah = 2 Kg/cm²
200 kN/m² 1500
0.2 mpa
Direncanakan pondasi telapak berbentuk bujur sangkar dengan tebal minimum pondasi 160 mm
(SK-SNI-T-15-1991-03, Pasal 3, 8, 7)
Tebal penutup beton (p) minimum 70 mm (SK-SNI-T-15-1991-03, Pasal 3, 10, f)
Dicoba :
h = 250 mm
Maka lebar dapat ditentukan :
- Menentukan telapak pondasi
a = σbeton × B × B × h
= 24 × B² × 0.25
= 6.00 × B²
- Berat tanah
b = tanah × (df - h) × (B - b kolom)²
= 16 × 1.5 - 0.25 × B - 0.40 2
= 20.00 × B² - 0.65 B + 0.16
= 20.00 × B² - 13.00 B + 3.20
Berat keseluruhan = ΣP
ΣP = 6.00 B² + 20.00 B² - 13.00 B + 3.20 + 200.668
= 26.00 B² - 13.00 B + 203.868
B² = ΣP --> σtanah B² × ΣP
σtanah = 200 × B² = 26.00 B² + 13.00 B - 203.868
= 200 B² - 26.00 B² + 13.00 B - 203.868
= 174.00 B² + 13.00 B - 203.868
Dicoba :
B = 1.10
Sehingga :
ΣP = 26.00 1.10 2 - 13.00 1.10 + 203.868
= 221.028 kN
ΣP wx
σmax = +
B² w
w = 1/6 × B × B² = 1/6 × B³
= 1.10 3 ÷ 6
= 0.222
221.028 7.424
σmax = + = 216.13434 > dari 200 kN/m² (cek)
1.10 2 0.222
Dicoba :
B = 1.50
Sehingga :
ΣP = 26.00 1.50 2 - 13.00 1.50 + 203.868
= 242.868 kN
ΣP wx
σmax = +
B² w
w = 1/6 × B × B² = 1/6 × B³
= 1.50 3 ÷ 6
= 0.563
242.868 7.424
σmax = + = 121.13956 ≤ dari 200 kN/m² (ok)
1.50 2 0.563
Exsentrisitas (e) =
wx + H 7.424 + 14.247
= = 0.089 mm
ΣP 242.868
DIRENCANAKAN :
Tebal pondasi = 250 mm
Penutup beton = 70 mm P m
Lebar pondasi = 1500 mm
MT
16
ΣP 6× e
QUnet = ×1 ±
B² B 1500
242.868 6 × 445
= × 1 ±
1500 2 1500
= 0.3 max
1500
= 0.652 min
Qc
Qv1
d= 250 - 70 = 180 mm Q
bo = 4 450 + 180 = 2520 mm
1500
Eksentrisitas beban kolom menyebabkan terjadinya tegangan
dibawah tanah tidak merata, diasumsikan berubah secara linier sepanjang telapak pondasi
1
VU1 = / 2 0.476 + 0.5534 × 1500 × 750 - 330 = 324.261 N
1
Vc = / 6 √ fc' × bw × d
1
= / 6 √ 20 × 450 × 180
1
= / 6 × 4.47 × 450 × 180
= 603.450
0.652
+ 0.5534 2 6
mn = 0.5 × 1500 × 750 - 250 × 10
2
= 0.3014 × 1500 × 250000 × 10 6
= 1.13E+08
= 113.025