NIM : 2115124030
No : 06
Kelas/Prodi : 4E/ D4 Manajemen Proyek Konstruksi
Jurusan : Teknik Sipil
C
H 5.00 m
T 0.201 dt
C 0.700
C = 0,70
T = 0,21
Beton SRPMM = 5Rm
Vn= Ve/R= (C*I*Wt)/R
vn 14.00 kg/m
14000 kg
Vn 14.00 ton
Lantai Wi (t) Zi (m) Wi . zi (tm) Fi (t) Vi (t)
W1 100000 5 500000 14.000 14.000
Wf 100000 500000
a. AS A (Kolom 1 dan 2)
KB = 500
K = kb/kk
KK=200 K = 2.500
aij = (0,5+K)/(2/K)
aij = 0.667
b. AS B (Kolom 3 dan 4)
KB = 500
K = kb/kk
KK = 400 K = 1.250
aij = (0,5+K)/(2/K)
aij = 0.538
c. AS C (Kolom 5 dan 6)
KB = 500
K = kb/kk
K = 0.833
KK = 600
aij = (0,5+K)/(2/K)
aij = 0.471
Ki =
Lantai ∑Dij 0.75.12.(E/h²) ∑Dij*(0,75*12 Vi (ton)
(E/h^2))
Wi x di²
Lantai Wi (t) Fi (t) di (mm) Fi x di(t mm)
(t mm2)
1 100000 14.00 14.67 21527.63 205.41
∑ 21527.63 205.41
a. AS A (Kolom 1 dan 2)
Dij= 133.33 Vi= 14000
∑Dij= 1262.14 Hij= 1478.97 kg
K= 2.500 y= 0.55
b. AS B (Kolom 3 dan 4)
Dij= 215.38 Vi= 14000
∑Dij= 1262.14 Hij= 2389.10 kg
K= 1.250 y= 0.55
c. AS C (Kolom 5 dan 6)
Dij= 282.35 Vi= 14
∑Dij= 1262.14 Hij= 3.13 kg
K= 0.833 y= 0.55
5. Gaya geser tambahan akibat eksentrisitas
𝑋𝑘𝑖= (2 𝑥 200 𝑥 0+2 𝑥 400 𝑥 4+2 𝑥 600 𝑥 9 )/(2 𝑥 200+2 𝑥 400+2 𝑥 600)
Pusat Kekakuan =
𝑋𝑘𝑖= (0+3200+10800)/(400+800+1200)
𝑋𝑘𝑖= 14000/2400
Xki = 5.833 m
T = Vi x ed atau Hiy x ed = T
Ec= 1.333 m
0,1b= 0,1 x 9 = 0.9 m 0,1b < ec < 0,3b
0,3b= 0,3 x 9 = 2.7 m
ed2 = ec - 0,05 x b
= 0.883 m
Jadi ed = 2.450
T= Vi x ed
= 34.3 kgm
Dij = aij*kkij
Dij = 133.33
∑Dij = 266.67
Dij = aij*kkij
Dij = 215.38
∑Dij = 430.77
Dij = aij*kkij
Dij = 282.35
∑Dij = 564.71
di = Vi/Ki di = Sdi
(cm) (cm)
1.467 1.467
Mka = Hij*(1-y)*5
Mka = 3327.68 kgm
MKb= Hij*y*5
MKb= 4067.16 kgm
Mka = Hij*(1-y)*5
Mka = 5375.48 kgm
MKb= Hij*y*5
MKb= 6570.03 kgm
Mka = Hij*(1-y)*5
Mka = 7.05 kgm
MKb= Hij*y*5
MKb= 8.61 kgm
3020,1 4384
8415 84 8415
15
1 2 3
𝑥 400+2 𝑥 600)
1.833 3.167
xi ayi*xi² Hxi Hyi
-5.833 22.685 -0.774
-5.833 22.685 0.774
-1.833 1.810 -0.625
-1.833 1.810 0.625
3.167 4.719 -0.547
3.167 4.719 0.547
58.428
30
20,
1
6
8
8
5