Tugas Terstruktur Beton II

PERENCANAAN KOLOM

Dengan menggunakan asumsi kolom kuat balok lemah, maka momen


yang dipakai adalah
M kapasitas balok dengan As = 6 Ø 12 = 679 mm²
Maka :

As × fy 67.9 × 400 27160 m


a= = = = 5.325
0,85 × fc × bw 0.85 × 20 × 300 5100 3.5 m
Mn = As × fy (d - a/2)

5.325
= 679 × 400 404 - = 10.900 kNm
2

MR = ф Mn = 1 10.900 = 8.720

Pu = V21 + V23
= 135.230 + 126.1695 0.3 × 0.45 - 0.11 × 4.8 × 24 = 273.2 kN

MENGHILANGKAN FAKTOR TEKUK


Dari SK SNI - T - 15 - 1991 - 03 Pasal 3, 1, 5 modulus elastisitas beton (Ec)
Ec = 470 √ fc' = 470 √ 20 = 2101.90 mpa
= 21019 N/mm²

MOMEN INERSIAL BALOK (I g Balok)


= 1/12 × b × h³
3
= 300 × 450 / 12 = 2278125000 mm⁴

MOMEN INERSIA KOLOM (I g Kolom)


= 1/12 × C4
= 400 4 / 12 = 2133333333 mm⁴

1,2 × WD 1.2 × 3.96 4.752


βd = = = = 0.543
1,2 (WD) + 1,6 (WL) 1.2 × 3.96 + 1.6 × 2.5 8.752

12
[(Ec × Ig)/5] 21019 × 2278125000 / 5 9.5768 × 10 12
EIb = = = = 6.20661 × 10
1 + βd 1 + 0.543 1.543
= 6206.61 kNm²
12
[(Ec × Ig)/2,5] 21019 × 2133333333 / 2.5 17.93625 × 10 12
EIX = = = = 11.62427 × 10
1 + βd 1 + 0.543 1.543
= 11624.27 kNm²

Fakultas Teknik Jurusan Sipil Universitas Panca Bhakti Pontianak [1]


Tugas Terstruktur Beton II

Untuk menentukan panjang tekuk dari kolom akan diterapkan dengan menggunakan grafik H.C
(tabel dan grafik perhitungan beton bertulang)
Kolom bawah = ф = 0 (terjepit penuh)
Kolom atas ф = [(EIX / Lk) / Eib]/Lb

11624.27 / 3.5 3321.22


ф= = = 2.676
6206.61 / 5 1241.32
Dari kedua nilai ф untuk kolom atas dan bawah maka K = 0.653
Lv = 0.653 - 0.500 = 0.153
r = 0.3 × hc
= 0.3 × 350 = 105.00 mm ~ 0.1050 m
Maka, (K x Lv) / r
0.653 × 0.153
= = 0.95 < 22
0.1050

MENENTUKAN TULANGAN
MU = 18.252 kN
PU = 273.198 kN
eperlu = 18.252 / 273.198 eminimum = 15 + 0.03 × 450
= 0.067 m = 29 mm < eperlu
= 67 mm

fc' = 20 ф= 0.65 Agr = 400 × 400 = 160000

Pu 273.198
= = = 0.0155 (Arah Y)
ф . Agr . 0,85 . fc' 0.65 × 160000 × 0.85 × 20
et 67
= = 0.149
h 450

Pu et
= 0.0155 × 0.149 = 0.0023 (Arah X)
ф . Agr . 0,85 . fc' h

Diambil d' = 40
d' 40
= = 0.1
h 400
Dari grafik dan tabel perhitungan beton bertulang (terlampir) untuk :
fy = 400 mpa d'/h = 0.1 r = 0.001 ( Dari Grafik )
fc' = 20 mpa β = 1
ρ = β.r = 1 × 0.001 = 0.0010
Astot = ρ . Agr = 0.0010 × 160000 = 160.00 mm²

Tulangan yang memadai adalah 2 Ø 12 = 226.00 mm²

Fakultas Teknik Jurusan Sipil Universitas Panca Bhakti Pontianak [2]


Tugas Terstruktur Beton II

TULANGAN GESER PADA KOLOM

Wd Kolom = 0.4 × 0.4 × 24 = 3.84


Wu = 1.20 × Wd Kolom = 1.20 × 3.84 = 4.608
Vu . max = 1/2 . Wu . L = 4.61 × 3.50 / 2 = 8.068
Vumax = 1.15 1/2 . Wu . L = 1.15 × 8.07 = 9.278

KUAT GESER RENCANA (Vc)

Vc = 1/6 √fc' . bw . (bw - d) . 10-3


√ 20 × 300 × 450 - 300 × 10 -3
=
6
4.472 × 300 × 150 × 0.001 201.24
= = = 33.54
6 6
ф untuk geser = 0,6
1/2 ф Vc = 0.6 × 33.54 / 2 = 10.062 > dari Vu = 9.28 tidak perlu tulangan sengkang

Fakultas Teknik Jurusan Sipil Universitas Panca Bhakti Pontianak [3]


Tugas Terstruktur Beton II

PERENCANAAN PONDASI

DATA PERENCANAAN P

Df = 1500 mm MT
Mu = 18.252 kN
Pu = 273.198 kN
H = 9.278
1500
beton = 2400 Kg/m³
24 kN/m³
t= 16 kN/m³ 16
tanah = 2 Kg/cm²
200 kN/m² 1500
0.2 mpa
Direncanakan pondasi telapak berbentuk bujur sangkar dengan tebal minimum pondasi 160 mm
(SK-SNI-T-15-1991-03, Pasal 3, 8, 7)
Tebal penutup beton (p) minimum 70 mm (SK-SNI-T-15-1991-03, Pasal 3, 10, f)
Dicoba :
h = 250 mm
Maka lebar dapat ditentukan :
- Menentukan telapak pondasi
a = σbeton × B × B × h
= 24 × B² × 0.25
= 6.00 × B²
- Berat tanah
b = tanah × (df - h) × (B - b kolom)²
= 16 × 1.5 - 0.25 × B - 0.40 2
= 20.00 × B² - 0.65 B + 0.16
= 20.00 × B² - 13.00 B + 3.20

Berat keseluruhan = ΣP
ΣP = 6.00 B² + 20.00 B² - 13.00 B + 3.20 + 273.198
= 26.00 B² - 13.00 B + 276.398
B² = ΣP --> σtanah B² × ΣP
σtanah = 200 × B² = 26.00 B² + 13.00 B - 276.398
= 200 B² - 26.00 B² + 13.00 B - 276.398
= 174.00 B² + 13.00 B - 276.398

Disederhanakan dengan menggunakan rumus ABC


X1, X2 = (-b ± √b²-4AC)÷2a
-13.000 ± √ 13.00 2 - 4 174.00 × -276.398 -13.000 ± √ 192542.01 425.80
= = = = 1.22
2 × 174.00 348 348

Fakultas Teknik Jurusan Sipil Universitas Panca Bhakti Pontianak [4]


Tugas Terstruktur Beton II

Dicoba :
B = 1.30
Sehingga :
ΣP = 26.00 1.30 2 - 13.00 1.30 + 276.398
= 303.438 kN
ΣP wx
σmax = +
B² w
w = 1/6 × B × B² = 1/6 × B³
= 1.30 3 ÷ 6
= 0.366
303.438 18.252
σmax = + = 229.39527 > dari 200 kN/m² (cek)
1.30 2 0.366

Dicoba :
B = 1.50
Sehingga :
ΣP = 26.00 1.50 2 - 13.00 1.50 + 276.398
= 315.398 kN
ΣP wx
σmax = +
B² w
w = 1/6 × B × B² = 1/6 × B³
= 1.50 3 ÷ 6
= 0.563
315.398 18.252
σmax = + = 172.62489 ≤ dari 200 kN/m² (ok)
1.50 2 0.563

PERHITUNGAN BEBAN YANG BERKERJA (Bstp)


Bstp = b × B² × h
= 24 × 1.50 2 × 0.25 = 13.500

PERHITUNGAN BERAT TANAH (Bt)


Bstp = t × (Df - h) (B - b kolom)²
2
= 16 × 2 - 0.25 1.50 - 0.40
= 24.2

PU = 273.198 (beban luar)


ΣP = 315.398 (jumlah beban)

Exsentrisitas (e) =
wx + H 18.252 + 9.278
= = 0.087 mm
ΣP 315.398

Fakultas Teknik Jurusan Sipil Universitas Panca Bhakti Pontianak [5]


Tugas Terstruktur Beton II

DIRENCANAKAN :
Tebal pondasi = 250 mm
Penutup beton = 70 mm P m
Lebar pondasi = 1500 mm
MT

TEGANGAN TANAH YANG TERJADI


m 18.252
e = = = 0.058 ~ 58 1500
ΣP 315.398

16
ΣP 6× e
QUnet = ×1 ±
B² B 1500
315.398 6 × 445
= × 1 ±
1500 2 1500

= 0.0001401769 × 2.7800 = 0.000389691751111

= 0.39 max
1500
= 0.652 min

MENENTUKAN TEBAL TELAPAK PONDASI MENURUT


KRITERIA GESER DENGAN HARGA COBA
16

Qc

Qv1
d= 250 - 70 = 180 mm Q
bo = 4 400 + 180 = 2320 mm

1500
Eksentrisitas beban kolom menyebabkan terjadinya tegangan
dibawah tanah tidak merata, diasumsikan berubah secara linier sepanjang telapak pondasi

I. AKSI SATU ARAH

Qc = ½ (Q1nc + Q2net) = 0.652 + 0.39 ÷ 2 = 0.521


½ C1 + d
Qv = Qc + × Q - Qc
½L
150 + 180
= 0.521 + × 0.652 - 0.521 = 0.521 + 0.44 × 0.131 = 0.5786
750

1
VU1 = / 2 0.521 + 0.5786 × 1500 × 750 - 330 = 346.374 N

Fakultas Teknik Jurusan Sipil Universitas Panca Bhakti Pontianak [6]


Tugas Terstruktur Beton II

TEGANGAN GESER NOMINAL PADA POTONGAN e-e

1
Vc = / 6 √ fc' × bw × d
1
= / 6 √ 20 × 400 × 180
1
= / 6 × 4.47 × 400 × 180
= 536.400

KUAT GESER RENCANA


= 0.6 × 536.400
= 321.840
Karena harga kuat geser rencana lebih besar dari Vu1, maka
d = 180 memenuhi / mencukupi untuk menahan geser satu arah

II. AKSI DUA ARAH


Karena nilai eksentrisitas e adalah kecil, tegangan geser nominal Vn dihitung berdasarkan separuh bagian dng
pembebanan yang lebih besar. Tegangan besar pd bidang kritis geser pondasi yg terletak pd jarak d/2 dari muka
kolom dihitung dng menggunakan bidang kritis bo dng distribusi tegangan trapesium seperti terlihat digambar
d+ c
Qvc = Qc + × Qnet - Qc
L
180 + 400
= 0.5210 + × 0.652 - 0.521
1500

= 0.5210 + 0.3867 × 0.131 = 0.57165

0.652 - 0.521 580


QU2 = × 1500 × 750 - 0.5717 + 0.521 × 580 ×
2 2
= 0.5865 × 1500 × 750 - 0.0507 × 580 × 290
= 651284.76

HARGA KEKUATAN GESER MINIMAL DENGAN βe = 1 adalah :


3
Vc = 0.33 fc' 0.50 × bo d = 0.33 20 0.50 × 2320 180 × 10
= 0.33 × 4.472 × 1160 × 180000
= 308.139 N
Lc = 25 (Kolom internal)
Vc = (Ls × d/bo + 2) fc' (0,5 × bo) d/12
180 180
= 25 + 2 20 0.5 × 2320
2320 12
= 3.94 × 4.472 × 1160 × 15.00
= 306582.432 N

Jadi harga yang diambil adalah harga = 308.139 N


фVc = 0.60 × 308.139 = 184.883 < dari Vu2 651284.76
jadi untuk d = 90 tidak aman untuk geser dua arah
PINJAMAN MOMEN LENTUR
Tegangan tanah pada muka kolom
Qm = 0.5786

Fakultas Teknik Jurusan Sipil Universitas Panca Bhakti Pontianak [7]


Tugas Terstruktur Beton II

0.652
+ 0.5786 2 6
mn = 0.5 × 1500 × 750 - 250 × 10
2
= 0.3077 × 1500 × 250000 × 10 6
= 1.15E+08
= 115.3875

Momen numerik mn = mu/ф = 115.3875 ÷ 0.6


= 192.313 kNm

mn = As × fy (d - ½×a) (diasumsikan) 0,9d


As × 250 1 × 180 = 24039000
24039000 24039000
As = =
250 0.9 × 180 40500
= 593.55556 ~ 590 mm² (untuk lebar total pondasi)
Dari persamaan keseimbangan material
As × fy 590 × 400 236000
a= = = = 9.833
0,8 × fc × b 0.8 × 20 × 1500 24000 e
Revisi nilai tersebut diatas
9.833
192312500 = As × 250 180 × = As × 250 × 884.97
2
192312500
As = = 869.24 ~ 870 mm²
221242.5
Rasio tulangan :
870
ρ = = 0.0032
1500 × 180
tulangan minimum untuk susut dan temperatur minimum (ρmin= 0,002)
0.002 < = (ok)
Digunakan tulangan
Ø14 - 175 As = 880

PINDAHKAN GAYA KE PONDASI


Kuat tekan rencana pada kolom adalah
фpn = ф 0.85 fc' × Agr = 0.65 0.85 20 × 1600 = 17680 > 870
Karena фpn > Pu, mampu menahan gaya aksial melalui tegangan beton dan tulangan pasak

Fakultas Teknik Jurusan Sipil Universitas Panca Bhakti Pontianak [8]