Anda di halaman 1dari 33

BAB 4

PERENCANAAN
BALOK ANAK
ILHAM REZA FITRIANSYAH (202110340311025)
MAGHFIROH DWI RIZKAYANTI (202110340311028)

PERENCANAAN BALOK ANAK ATAP

4.1 Perencanaan Penulangan Balok Anak Atap Melintang


Grid B-1-3-4-6

Gambar distribusi beban dari plat ke balok

Tugas Besar Beton Bertulang | 41


Pendistribusian pembebanan dari Pelat Atap ke Balok Anak Memanjang (30x60)
cm
● Beban Mati :
⮚ Beban sendiri pelat = 288 Kg/m2
● Beban Hidup :
⮚ Berat guna atap = 100 Kg/m2
⮚ Beban air hujan = 50 Kg/m2

● Beban Berfaktor :
⮚ qu = 1,2 (qdl) + 1,6 (qll) + 0,5 (RL)
qu = 1,2 (322) + 1,6 (150) + 0,5 (50)
qu = 651.4 Kg/m2

P1 =P2 = 0.5 x a x t
= 0.5 x 1,5m x 1,9319m
= 1,449 m2
RA = P1
= 1,449 m2
1
Mmax = (Ra x 0,5 x 3 – P1 (3 x 1,5 m ))x 2 x qu

= ( 1,449 m2 x 0.5 x 3 m – 1,449 m2 (0,375 𝑚)) x 2 x 651.4 Kg/m2


= (1,630 m3) x 1302,8 Kg/m2
= 2123,564 Kg/m
ILHAM REZA FITRIANSYAH (202110340311025)
MAGHFIROH DWI RIZKAYANTI (202110340311028)

Beban Equivalen

𝑀𝑚𝑎𝑥 𝑃𝑒𝑟𝑠𝑒𝑔𝑖 = 1/8 × 𝑞𝑒𝑞 × 𝐿2


2123,564 𝐾𝑔/𝑚 𝑥 8
𝑞𝑒𝑞 = 32

𝑞𝑒𝑞 = 1887,612 𝑘𝑔/𝑚

● Berat sendiri balok = b×(h-t plat)×bj beton


= 0.30×(0.60 - 0.10) × 2400
= 360 kg/m
● Q Trapesium = qeq + berat sendiri balok
= 1887,612 𝑘𝑔/𝑚 + 360 kg/m
= 2247,612 kg/m
= 22,47 kN/m

Tugas Besar Beton Bertulang | 43


4.2 PERENCANAAN PENULANGAN BALOK ANAK ATAP
DAERAH TUMPUAN(30X60)

PENULANGAN DAERAH TUMPUAN


● Mu = 38 kNm (Diambil dari momen tumpuan terbesar)
● b = 300 mm
● h = 600 mm
● Fc’ = 35 Mpa
● Fy = 400 Mpa
● L = 3000 mm
● drencana = 600– 70
= 530 mm
● Mencari β1 (karena lebih dari 28 MPa)

𝛽1 = 0,85 – 0,008 (𝑓𝑐 ′ − 28) = 0,85 – 0,008 (35 − 28) = 0,794

● Mencari K
𝑀𝑢 38 𝑥 106
K = ∅.𝑏.𝑑2 = 0,9.300.5302 = 0.501

● Mencari 𝜔
𝑘 0.501
𝜔 = 0,85 - √0,72 − 1,7 = 0,85 - √0,72 − 1,7 = 0,016
𝑓𝑐′ 35

● Mencari 𝜌
𝑓𝑐′ 35
𝜌=𝜔. = 0,016 . 400 = 0,0014
𝑓𝑦

● Mencari 𝜌b
ILHAM REZA FITRIANSYAH (202110340311025)
MAGHFIROH DWI RIZKAYANTI (202110340311028)

0,85 .𝑓𝑐′ .𝛽1 600 0,85 𝑥 35 𝑥 0,794 600


𝜌b = . 600+𝑓𝑦 = . 600+400 = 0,035
𝑓𝑦 400

● Mencari 𝜌maks
𝜌maks = 0,75 x 𝜌b = 0,75 x 0,035 = 0,026
● Mencari 𝜌min
1,4 1,4
𝜌min = = 400 = 0,0035
𝑓𝑦

𝜌 ≤ 𝜌𝑚𝑖𝑛 ≤ 𝜌𝑚𝑎𝑘𝑠
0.0014<0.0035<0.026
Dipakai ρ = 0,0035

LUAS TULANGAN
As = ρ x b x d
= 0,0035 × 300 × 530
= 556,5 mm2

Dipakai tulangan 3 ϕ 16 ( As = 603,2 mm2 )

Pemeriksaan d pakai

bpakai = 2.selimut beton+2.Øsengkang+ n .Øtulangan + (n-1).Jarak Tulangan


= 2 (40) + 2 (10) + 3 (16) + ( 3 – 1) (25)
= 186 < b = 200, maka digunakan tulangan satu lapis
dpakai = h – selimut beton – Ø sengkang - 1/2 ∅ tulangan
1
= 600 – 40 – 10 - ( 2 x 16)

Tugas Besar Beton Bertulang | 45


= 542mm > drencana = 530 mm (OK)
16
d’ = 40 + 10 + = 58 mm
2

Kontrol :
As = 603,2 mm2
Fy = 400 Mpa
Fc’ = 35 Mpa
𝐴𝑠 𝑥 𝑓𝑦 603,2 × 400
⮚ a = = = 27,034 mm
0,85 𝑥 𝑓𝑐 ′ 𝑥 𝑏 0,85×35×300
𝑎
⮚ Mn1 = 𝐴𝑠 𝑥 𝐹𝑦 𝑥 (𝑑 − 2) x 10-6
27,034
= 603,2 × 400 × (542 − ) x 10-6
2

= 127,512 𝑘𝑁𝑚

( SNI 2847 2013 PASAL 9.2 ∅ = 0,9, penampang terkendali tarik )


⮚ Mr = Ø x Mn
= 0,9 x 127,512 kNm
=114,761 kNm
Mr ≥ Mu
114,761 kNm ≥ 38 kNm (AMAN)
ILHAM REZA FITRIANSYAH (202110340311025)
MAGHFIROH DWI RIZKAYANTI (202110340311028)

4.3 PERENCANAAN PENULANGAN BALOK ANAK ATAP


DAERAH LAPANGAN (30X60)

PENULANGAN DAERAH LAPANGAN


● Mu = 27 kNm (Diambil dari momen tumpuan terbesar)
● b = 300 mm
● h = 600 mm
● hf = 100 mm
● Fc’ = 35 Mpa
● Fy = 400 Mpa
● L = 3000 mm
● drencana = 600– 70
= 530 mm

Lebar balok T :
1 1
bf = 4 x L = 4 x 3000 = 750 mm

bf = bw + (16 x hf ) = 250 + ( 16 x 100 ) = 1850 mm


bf = bw + Ln = 250 + ( 3000 - 530 ) = 2720 mm
Maka dipakai bf = 750 mm

Tugas Besar Beton Bertulang | 47


Anggap seluruh sayap tekan :
ℎ𝑓
MR = Ø (0,85.fc’.bf.hf.(d - ))
2
100
= 0,9 (0,85.(35).(750).(100).(530 - ))
2

= 963,900 kNm > Mu = 27 kNm


( Balok T Persegi )
● Mencari β1 (karena lebih dari 28 MPa)

𝛽1 = 0,85 – 0,008 (𝑓𝑐 ′ − 28) = 0,85 – 0,008 (35 − 28) = 0,79

● Mencari K
𝑀𝑢 27 𝑥 106
K = ∅.𝑏.𝑑2 = 0,9.300.5302 = 0,355

● Mencari 𝜔
𝑘 0,355
𝜔 = 0,85 - √0,72 − 1,7 = 0,85 - √0,72 − 1,7 = 0,011
𝑓𝑐′ 35
● Mencari 𝜌
𝑓𝑐′ 35
𝜌=𝜔. = 0,011 . 400 = 0,0009
𝑓𝑦
● Mencari 𝜌b
0,85.𝑓𝑐′ .𝛽1 600 0,85 𝑥 35 𝑥 0,79 600
𝜌b = . 600+𝑓𝑦 = . 600+400 = 0,035
𝑓𝑦 400

● Mencari 𝜌maks
𝜌maks = 0,75 x 𝜌b = 0,75 x 0,035 = 0,026
● Mencari 𝜌min
1,4 1,4
𝜌min = = 400 = 0,0035
𝑓𝑦

𝜌 ≤ 𝜌𝑚𝑖𝑛 ≤ 𝜌max
0,0009 ≤ 0,0035 ≤ 0,026
Dipakai ρmin = 0,0035 ( karena ρ < ρmin < ρ max )

LUAS TULANGAN
As = ρ x b x d
= 0,0035 × 300 × 530
= 556,5 mm2
ILHAM REZA FITRIANSYAH (202110340311025)
MAGHFIROH DWI RIZKAYANTI (202110340311028)

Dipakai tulangan 2 ϕ 19 ( As = 567,0 mm2 )


Pemeriksaan d pakai

bpakai = 2.selimut beton+2.Ø sengkang+ n .Ø tulangan + (n-1).Jarak Tulangan


= 2 (40) + 2 (10) + 3 (19) + (3 – 1) (25)
= 207 < b = 300, maka digunakan tulangan satu lapis
dpakai = h – selimut beton – Ø sengkang - 1/2 ∅ tulangan
1
= 600 – 40 – 10 - ( 2 x 19)

= 540,5 mm > drencana = 530 mm (OK)


19
d’ = 40 + 10 + = 59,5 mm
2

Kontrol :
As = 567,0 mm2
Fy = 400 Mpa
Fc’ = 35 Mpa
𝐴𝑠 𝑥 𝑓𝑦 567,0 ×400
⮚ a = = = 25,411 mm
0,85 𝑥 𝑓𝑐 ′ 𝑥 𝑏 0,85×35×300
𝑎
⮚ Mn = 𝐴𝑠 𝑥 𝐹𝑦 𝑥 (𝑑 − )
2
𝟐𝟓,𝟒𝟏𝟏
= 567,0 × 400 × (540,5 − ) x 10-6
2

= 119,703 𝑘𝑁𝑚
( SNI 2847 2013 PASAL 9.2 ∅ = 0,9, penampang terkendali tarik )
⮚ Mr = Ø x Mn
= 0,9 x 119,703 kNm
= 107,732 kNm

Tugas Besar Beton Bertulang | 49


Mr ≥ Mu
107,732 kNm ≥ 27 kNm (AMAN)
MUH. SYARIF FADHILLAH (201910340311111)
WARDANIA ISWAN (201910340311138)

4.4 PERENCANAAN SENGKANG BALOK ANAK ATAP (25X50)

Vu = 73,4 kN (Diambil dari gaya lintang tumpuan terbesar)


bw = 300 mm
h = 600 mm
hf = 100 mm
d = 530 /2 = 265 mm
fc’ = 35 Mpa
fy = 400 Mpa
L = 3000 mm
● Hitung ϕvc ; ½ ϕvc ; vc1 ; vc2

Nilai λ = 1,0 untuk beton normal (SNI 2847-2013 Pasal 11.6.4.3)


⮚ ØVc = ϕ (0,17 λ √𝑓𝑐′ bw d )
= 0,65 (0,17 x 1,0 x √35 x 300 x 265)
= 51,971 kN
⮚ ½ Ø Vc = ½ . 51,971
= 25,985 kN
𝑉𝑢
⮚ Vs = - Vc
Ø
73,4
= 0,65
- 51,971

= 60,952 kN

Tugas Besar Beton Bertulang | 51


⮚ vc1 = 0,33 √fc bw d
= 0,33 x √35 x 300 x 265
= 155,208 kN
⮚ vc2 = 0,66 √fc bw d
= 0,66 x √35 x 300 x 265
= 310,416 kN
Vu Kritis terjadi pada saat balok berimpit dengan kolom atau sama
dengan ½ lebar kolom yakni = ½ . 600 = 300 mm

Vu kritis = 73,4 kN

Vu kritis 1 = 69,11 kN

Vu kritis 2 = 36,7 kN
X1

X2
12,6 kN

𝑋1 2,825
𝑉𝑢 𝑘𝑟𝑖𝑡𝑖𝑠 1 = 63,5 = 3
73,4 𝑥 2,825
𝑋1 = = 69,11
3

𝑋2 1,5
𝑉𝑢 𝑘𝑟𝑖𝑡𝑖𝑠 2 = 63,5 = 3
73,4 𝑥 1,5
𝑋2 = = 36,7
3
ILHAM REZA FITRIANSYAH (202110340311025)
MAGHFIROH DWI RIZKAYANTI (202110340311028)

Persyaratan :
⮚ jika Vu < ½ ϕvc tidak dibutuhkan tulangan geser.
⮚ jika ½ ϕVc ≤ Vu ≤ ϕVc dibutuhkan tulangan geser minimum. Dapat
dipasang tulangan sengkang vertical berdiameter 10 mm dengan jarak maksimum
di tentukan.
⮚ Jika Vu ≥ ϕVc tulangan geser harus disediakan.

● PERHITUNGAN SENGKANG DAERAH TUMPUAN (0,175 m – 1,5 m)


½ ϕVc ≤ ϕVc ≤ Vu Kritis 1
25,995 kN ≤ 51,990 kN ≤ 69,11 kN
Keterangan :
Tulangan geser harus disediakan.
Rencana Ø sengkang = 10 mm
Av = 2 . As
= 2 . ¼ . π .d2
= 2 . ¼ . 3,14 . 102
= 157 mm2
𝐴𝑣 𝑥 𝑓𝑦 𝑥 𝑑
S =
𝑉𝑢 𝐾𝑟𝑖𝑡𝑖𝑠1
157 𝑥 400 𝑥 265
=
69,11

= 240,804 mm
𝑑 265 𝑚𝑚
Smax = = = 132,5 mm ≈ 150 mm
2 2

Maka dipakai sengkang Ø10-150 mm

Persyaratan :
⮚ jika Vu < ½ ϕvc tidak dibutuhkan tulangan geser.
⮚ jika ½ ϕVc ≤ Vu ≤ ϕVc dibutuhkan tulangan geser minimum. Dapat
dipasang tulangan sengkang vertical berdiameter 10 mm dengan jarak maksimum
di tentukan.
⮚ Jika Vu ≥ ϕVc tulangan geser harus disediakan.

Tugas Besar Beton Bertulang | 53


● PERHITUNGAN SENGKANG DAERAH LAPANGAN (1,5 m – 3 m)
½ ϕVc ≤ ϕVc ≤ Vu Kritis 2
25,985 kN ≤ 51,971 kN ≤ 36,7 kN
Keterangan :
Tulangan geser harus disediakan.
Rencana Ø sengkang = 10 mm
Av = 2 . As
= 2 . ¼ . π .d2
= 2 . ¼ . 3,14 . 102
= 157 mm2
𝐴𝑣 𝑥 𝑓𝑦 𝑥 𝑑
S =
𝑉𝑢 𝐾𝑟𝑖𝑡𝑖𝑠 2
157 𝑥 400 𝑥 265
= 36,7

= 453,460 mm
𝑑 265 𝑚𝑚
Smax = = = 132,5 mm ≈ 150 mm
2 2

Maka dipakai sengkang Ø10-150 mm


ILHAM REZA FITRIANSYAH (202110340311025)
MAGHFIROH DWI RIZKAYANTI (202110340311028)

Tugas Besar Beton Bertulang | 55


Tabel Penulangan Balok Anak Melintang Atap

Mu As Hitung As Pakai Mr
No Daerah 𝜌 𝑚𝑖𝑛 𝜌 𝜌 𝑚𝑎𝑥 Tulangan Koreksi
(kN/m) (mm2) (mm2) (kN/m)

1. Tumpuan 38 0,0035 0,0014 0,026 556,5 603,2 3Ø16 114,761 𝑀𝑅 ≥ 𝑀𝑢

2. Lapangan 27 0,0033 0,0009 0,026 556,5 567,0 2Ø19 107,732 𝑀𝑅 ≥ 𝑀𝑢

Tabel Penulangan Sengkang Balok Anak Melintang Atap

ØVc ½ Ø Vc As Pakai
No Daerah Vu Kritis Tulangan
(kN) (kN) (mm2)

1. Tumpuan 73,4 51,971 25,985 Ø10-150 524

2. Lapangan 12,6 51,971 25,985 Ø10-150 524


ILHAM REZA FITRIANSYAH (202110340311025)
MAGHFIROH DWI RIZKAYANTI (202110340311028)

PERENCANAAN BALOK ANAK LANTAI

4.5 Perencanaan Penulangan Balok Anak Lantai Melintang


Grid B-1-3-4-6

Gambar distribusi beban dari plat ke balok

Tugas Besar Beton Bertulang | 57


Pendistribusian pembebanan dari Pelat Lantai ke Balok Anak Melintang
(30x60) cm
● Beban Mati :
⮚ Beban sendiri pelat = 288 Kg/m2
● Beban Hidup :
⮚ Berat guna merata = 479 Kg/m2
⮚ Beban Terpusat = 890 Kg/m2

● Beban Berfaktor :
⮚ qu = 1,2 (qDL) + 1,6 (qLL)
qu = 1,2 (394) + 1,6 (479)
qu = 1239,2 Kg/m2

P1 =P2 = 0.5 x a x t
= 0.5 x 1,5m x 1,9319m
= 1,449 m2
RA = P1
= 1,449 m2
1
Mmax = (Ra x 0,5 x 3 – P1 (3 x 1,5 m ))x 2 x qu

= ( 1,449 m2 x 0.5 x 3 m – 1,449 m2 (0,375 𝑚)) x 2 x 1239,2Kg/m2


= (1,630 m3) x 2478,4 Kg/m2
= 4039,792 Kg/m
ILHAM REZA FITRIANSYAH (202110340311025)
MAGHFIROH DWI RIZKAYANTI (202110340311028)

Beban Equivalen

𝑀𝑚𝑎𝑥 𝑃𝑒𝑟𝑠𝑒𝑔𝑖 = 1/8 × 𝑞𝑒𝑞 × 𝐿2


4039,792 𝐾𝑔/𝑚 𝑥 8
𝑞𝑒𝑞 = 32

𝑞𝑒𝑞 = 3590,926 𝑘𝑔/𝑚

● Berat sendiri balok = b×(h-t plat)×bj beton


= 0.30×(0.60 - 0.12) × 2400
= 345,6 kg/m
●Q = qeq + berat sendiri balok
= 3590,926 𝑘𝑔/𝑚 + 345,6 kg/m
= 3936,526 kg/m
= 39,36 kN/m

Tugas Besar Beton Bertulang | 59


4.6 PERENCANAAN PENULANGAN BALOK ANAK LANTAI
DAERAH TUMPUAN(30X60)

PENULANGAN DAERAH TUMPUAN


● Mu = 63 kNm (Diambil dari momen tumpuan terbesar)
● b = 300 mm
● h = 600 mm
● Fc’ = 35 Mpa
● Fy = 400 Mpa
● L = 3000 mm
● drencana = 600– 70
= 530 mm
● Mencari β1 (karena lebih dari 28 MPa)

𝛽1 = 0,85 – 0,008 (𝑓𝑐 ′ − 28) = 0,85 – 0,008 (35 − 28) = 0,79

● Mencari K
𝑀𝑢 63 𝑥 106
K = ∅.𝑏.𝑑2 = 0,9.300.5302 = 0,83

● Mencari 𝜔
𝑘 0,83
𝜔 = 0,85 - √0,72 − 1,7 = 0,85 - √0,72 − 1,7 = 0,025
𝑓𝑐′ 35
ILHAM REZA FITRIANSYAH (202110340311025)
MAGHFIROH DWI RIZKAYANTI (202110340311028)

● Mencari 𝜌
𝑓𝑐′ 35
𝜌=𝜔. = 0,025 . 400 = 0,002
𝑓𝑦

● Mencari 𝜌b
0,85.𝑓𝑐′ .𝛽1 600 0,85 𝑥 35 𝑥 0,79 600
𝜌b = . 600+𝑓𝑦 = . 600+400 = 0,035
𝑓𝑦 400

● Mencari 𝜌maks
𝜌maks = 0,75 x 𝜌b = 0,75 x 0,035 = 0,026
● Mencari 𝜌min
1,4 1,4
𝜌min = = 400 = 0,0035
𝑓𝑦

𝜌𝑚𝑖𝑛 ≤ 𝜌 ≤ 𝜌maks
0,0035 ≤ 0,002 ≤ 0,026
Dipakai ρ = 0,0035 ( karena ρ min < ρ < ρ maks )

LUAS TULANGAN
As = ρ x b x d
= 0,0035 × 300 × 530
= 556,5 mm2

Dipakai tulangan 3 ϕ 16 ( As = 603,2 mm2 )


Pemeriksaan d pakai

bpakai = 2.selimut beton+2.Øsengkang+ n .Øtulangan + (n-1).Jarak Tulangan


= 2 (40) + 2 (10) + 3 (16) + (3 – 1) (25)
= 198 < b = 300, maka digunakan tulangan satu lapis

Tugas Besar Beton Bertulang | 61


dpakai = h – selimut beton – Ø sengkang - 1/2 ∅ tulangan
1
= 600 – 40 – 10 - ( 2 x 16)

= 542 mm > drencana = 530 mm (OK)


16
d’ = 40 + 10 + = 58 mm
2

Kontrol :
As = 603,2 mm2
Fy = 400 Mpa
Fc’ = 35 Mpa
𝐴𝑠 𝑥 𝑓𝑦 603,2 × 400
⮚ a = = = 27,034 mm
0,85 𝑥 𝑓𝑐 ′ 𝑥 𝑏 0,85×35×300
𝑎
⮚ Mn = 𝐴𝑠 𝑥 𝐹𝑦 𝑥 (𝑑 − 2) x 10-6
27,034
= 603,2 × 400 × (542 − ) x 10-6
2

= 127,512 𝑘𝑁𝑚

( SNI 2847 2013 PASAL 9.2 ∅ = 0,9, penampang terkendali tarik )

⮚ Mr = Ø x Mn
= 0,9 x 127,512 kNm
= 114,760 kNm
Mr ≥ Mu
114,76 kNm ≥ 63 kNm (AMAN)
ILHAM REZA FITRIANSYAH (202110340311025)
MAGHFIROH DWI RIZKAYANTI (202110340311028)

4.7 PERENCANAAN PENULANGAN BALOK ANAK LANTAI


DAERAH LAPANGAN (20X40)

PENULANGAN DAERAH LAPANGAN


● Mu = 45 kNm (Diambil dari momen tumpuan terbesar)
● b = 300 mm
● h = 600 mm
● hf = 120 mm
● Fc’ = 35 Mpa
● Fy = 400 Mpa
● L = 3000 mm
● drencana = 600– 70
= 530 mm

Tugas Besar Beton Bertulang | 63


Lebar balok T :
1 1
bf = 4 x L = 4 x 3000 = 750 mm

bf = bw + (16 x hf ) = 300 + ( 16 x 120 ) = 2220 mm


bf = bw + Ln = 300 + ( 3000 - 530 ) = 2770 mm
Maka dipakai bf = 750 mm
Anggap seluruh sayap tekan :
ℎ𝑓
MR = Ø (0,85.fc’.bf.hf.(d - ))
2
120
= 0,9 (0,85.(35).(750).(120).(530 - ))
2

= 5622,75 kNm > Mu = 41 kNm


( Balok T Persegi )

● Mencari β1 (karena lebih dari 28 MPa)

𝛽1 = 0,85 – 0,008 (𝑓𝑐 ′ − 28) = 0,85 – 0,008 (35 − 28) = 0,79

● Mencari K
𝑀𝑢 45 𝑥 106
K = ∅.𝑏.𝑑2 = 0,9.300.5302 = 0.593

● Mencari 𝜔
𝑘 0,593
𝜔 = 0,85 - √0,72 − 1,7 = 0,85 - √0,72 − 1,7 = 0,018
𝑓𝑐′ 35

● Mencari 𝜌
𝑓𝑐′ 35
𝜌=𝜔. = 0,018 . 400 = 0,0015
𝑓𝑦

● Mencari 𝜌b
0,85.𝑓𝑐′ .𝛽1 600 0,85.35.0,79 600
𝜌b = . 600+𝑓𝑦 = . 600+400 = 0,035
𝑓𝑦 400

● Mencari 𝜌maks
𝜌maks = 0,75 x 𝜌b = 0,75 x 0,035 = 0,026
● Mencari 𝜌min
1,4 1,4
𝜌min = = 400 = 0,0035
𝑓𝑦
ILHAM REZA FITRIANSYAH (202110340311025)
MAGHFIROH DWI RIZKAYANTI (202110340311028)

𝜌𝑚𝑖𝑛 ≤ 𝜌 ≤ 𝜌maks
0,0035 ≤ 0,0015 ≤ 0,026
Dipakai ρ = 0,0035 ( karena ρ min < ρ < ρ maks )

LUAS TULANGAN
As = ρ x b x d
= 0,0035 × 300 × 530
= 556,5 mm2

Dipakai tulangan 2 ϕ 20 ( As = 628,4 mm2 )

Pemeriksaan d pakai

bpakai = 2.selimut beton+2.Øsengkang+ n .Øtulangan + (n-1).Jarak Tulangan


= 2 (40) + 2 (10) + 2 (20) + (2 – 1) (25)
= 165 < b = 300, maka digunakan tulangan satu lapis
dpakai = h – selimut beton – Ø sengkang - 1/2 ∅ tulangan
1
= 600 – 40 – 10 - ( 2 x 20)

= 540 mm > drencana = 530 mm (OK)


20
d’ = 40 + 10 + = 60 mm
2

Kontrol :
As = 628,4 mm2
Fy = 400 Mpa
Fc’ = 35 Mpa

Tugas Besar Beton Bertulang | 65


𝐴𝑠 𝑥 𝑓𝑦 628,4 × 400
⮚ a = = = 28,163 mm
0,85 𝑥 𝑓𝑐 ′ 𝑥 𝑏 0,85×35×300
𝑎
⮚ Mn = 𝐴𝑠 𝑥 𝐹𝑦 𝑥 (𝑑 − 2) x 10-6
28,163
= 628,4 × 400 × (540 − ) x 10-6
2

= 132,19 𝑘𝑁𝑚

( SNI 2847 2013 PASAL 9.2 ∅ = 0,9, penampang terkendali tarik )

⮚ Mr = Ø x Mn
= 0,9 x 132,19 kNm
= 118,971 kNm

Mr ≥ Mu
118,971 kNm ≥ 45 kNm (AMAN)
ILHAM REZA FITRIANSYAH (202110340311025)
MAGHFIROH DWI RIZKAYANTI (202110340311028)

4.8 PERENCANAAN SENGKANG BALOK ANAK ATAP (30X60)

Vu = 123,2 kN (Diambil dari gaya lintang tumpuan terbesar)


bw = 300 mm
h = 600 mm
hf = 120 mm
d = 530 /2 = 265 mm
fc’ = 35 Mpa
fy = 400 Mpa
L = 3000 mm
● Hitung ϕvc ; ½ ϕvc ; vc1 ; vc2

Nilai λ = 1,0 untuk beton normal (SNI 2847-2013 Pasal 11.6.4.3)


⮚ ØVc = ϕ (0,17 λ √𝑓𝑐′ bw d )
= 0,65 (0,17 x 1,0 x √35 x 300 x 265)
= 51,971 kN
⮚ ½ Ø Vc = ½ . 51,971
= 25,985 kN
𝑉𝑢
⮚ Vs = - Vc
Ø
123,2
= – 51,971
0,65

= 137,567 kN

Tugas Besar Beton Bertulang | 67


⮚ vc1 = 0,33 √fc bw d
= 0,33 x √35 x 300 x 265
= 155,208 kN
⮚ vc2 = 0,66 √fc bw d
= 0,66 x √35 x 300 x 265
= 310,416 KN
Vu Kritis terjadi pada saat balok berimpit dengan kolom atau sama
dengan ½ lebar kolom yakni = ½ . 600 = 300 mm

Vu kritis = 123,2 kN

Vu kritis 1 = 116,013 kN

Vu kritis 2 = 61,6 kN
X1

X2

21,1 kN

𝑋1 2,825
𝑉𝑢 𝑘𝑟𝑖𝑡𝑖𝑠 1 = 63,5 = 3
123,2 𝑥 2,825
𝑋1 = = 116,013
3
𝑋2 1,5
𝑉𝑢 𝑘𝑟𝑖𝑡𝑖𝑠 2 = 63,5 = 3
123,2 𝑥 1,5
𝑋2 = = 61,6
3

Persyaratan :
⮚ jika Vu < ½ ϕvc tidak dibutuhkan tulangan geser.
⮚ jika ½ ϕVc ≤ Vu ≤ ϕVc dibutuhkan tulangan geser minimum. Dapat
dipasang tulangan sengkang vertical berdiameter 10 mm dengan jarak maksimum
di tentukan.
⮚ Jika Vu ≥ ϕVc tulangan geser harus disediakan.
ILHAM REZA FITRIANSYAH (202110340311025)
MAGHFIROH DWI RIZKAYANTI (202110340311028)

● PERHITUNGAN SENGKANG DAERAH TUMPUAN (0,175 m – 1,5 m)


½ ϕVc ≤ ϕVc ≤ Vu Kritis 1
25,985 kN ≤ 51,971 kN ≤ 116,013 kN
Keterangan :
Tulangan geser harus disediakan.
Rencana Ø sengkang = 10 mm
Av = 2 . As
= 2 . ¼ . π .d2
= 2 . ¼ . 3,14 . 102
= 157 mm2
𝐴𝑣 𝑥 𝑓𝑦 𝑥 𝑑
S =
𝑉𝑢 𝐾𝑟𝑖𝑡𝑖𝑠1
157 𝑥 400 𝑥 265
=
116,013

= 143,449 mm
𝑑 265 𝑚𝑚
Smax = = = 132,5 mm ≈ 150 mm
2 2

Maka dipakai sengkang Ø10-150 mm

Persyaratan :
⮚ jika Vu < ½ ϕvc tidak dibutuhkan tulangan geser.
⮚ jika ½ ϕVc ≤ Vu ≤ ϕVc dibutuhkan tulangan geser minimum. Dapat
dipasang tulangan sengkang vertical berdiameter 10 mm dengan jarak maksimum
di tentukan.
⮚ Jika Vu ≥ ϕVc tulangan geser harus disediakan.

Tugas Besar Beton Bertulang | 69


● PERHITUNGAN SENGKANG DAERAH LAPANGAN (1,5 m – 3 m)
½ ϕVc ≤ ϕVc ≤ Vu Kritis 2
25,985 kN ≤ 51,971 kN ≤ 61,6 kN
Keterangan :
Tulangan geser harus disediakan.
Rencana Ø sengkang = 10 mm
Av = 2 . As
= 2 . ¼ . π .d2
= 2 . ¼ . 3,14 . 102
= 157 mm2
𝐴𝑣 𝑥 𝑓𝑦 𝑥 𝑑
S =
𝑉𝑢 𝐾𝑟𝑖𝑡𝑖𝑠 2
157 𝑥 400 𝑥 265
=
61,6

= 270,162 mm
𝑑 265 𝑚𝑚
Smax = = = 132,5 mm ≈ 150 mm
2 2

Maka dipakai sengkang Ø10-150 mm


ILHAM REZA FITRIANSYAH (202110340311025)
MAGHFIROH DWI RIZKAYANTI (202110340311028)

Tugas Besar Beton Bertulang | 71


Tabel Penulangan Balok Anak Melintang Lantai

Mu As Hitung As Pakai Mr
No Daerah 𝜌 𝑚𝑖𝑛 𝜌 𝜌 𝑚𝑎𝑥 Tulangan Koreksi
(kN/m) (mm2) (mm2) (kN/m)

1. Tumpuan 63 0,0035 0,002 0,026 556,5 603,2 3Ø16 114,761 𝑀𝑅 ≥ 𝑀𝑢

2. Lapangan 45 0,0035 0,0015 0,026 556,5 628,4 2Ø20 118,971 𝑀𝑅 ≥ 𝑀𝑢

Tabel Penulangan Sengkang Balok Anak Melintang Lantai

ØVc ½ Ø Vc As Pakai
No Daerah Vu Kritis Tulangan
(kN) (kN) (mm2)

1. Tumpuan 123,2 51,971 25,985 Ø10-150 524

2. Lapangan 21,1 51,971 25,985 Ø10-150 524