KELOMPOK 3
Lx = 650 cm
Ln = Ly – (( ½ . b1) + ( ½ . b2))
= 650 – (( ½ . 35 ) + ( ½ . 35 ))
= 615,0 cm
Penentuan Tinggi Efektif
Tebal penutup beton ( p ) = 20 mm
Ø tulangan utama = 10 mm Tebal Plat
(h) = 150 mm dy dx
d efektif x = h – p -0,5Ø
= 150 – 20 – 0,5 . 10
= 125 mm
d efektif y =h–p–½Ø-Ø
= 150 – 20 –½ . 10 – 10
= 115 mm
Pembebanan Plat Lantai 1
• Beban Mati ( WD )
I. Berat sendiri plat = 0,15 x 2400 = 360 kg/m2
II. Beban SIDL = 0,05 x 3000 = 150 kg/m2 (ME, keramik, spesi
semen, dll)
III. Ceiling dan Plafond = 30 kg/m2
IV. Total WD = 540 kg/m2
• Beban Hidup ( WL )
Perkantoran WL = 400 kg/m2
• Beban Berfaktor ( WU )
Wu = 1,2 WD + 1,6 WL
= (1,2 x 540) + (1,6 x 400)
= 1288 kg/m2
= 12,88 KN/m2
Perhitungan Plat Lantai 1
Mlx = 0,001 . Wu . Lx2 . C
= 0,001 . 12,88 . 6,50 2 .
28
= 15,24 KNm
= 0,001 . Wu . Lx2 . C
Mly
= 0,001 . 12,88 . 6,50 2.
25
= 13,61 KNm
= 0,001 . Wu . Lx2 . C
Mtx
= 0,001 . 12,88 . 6,50 2.
60
= 32,65 KNm
= 0,001 . Wu . Lx2 . C
Mty
= 0,001 . 12,88 . 6,50 2.
54
= 29,39 KNm
Perhitungan Plat Lantai 1
•Rasio tulangan minimum
ρmin` = 1,4
fy = 1,4
400
= 0,0035
Momen terfaktor;
Mu= kN.m=110320000 N.mm
Asumsi tulangan leleh, maka fs=fs’=fy= 400 Mpa, tetapkan rasio tulangan tekan
terhadap tulangan tarik 30% (δ = 0,3); d=h-50=600-50=550 mm
= 0,179
= 0,030 ok!
Luas tulangan yang diperlukan
Untuk tulangan rangkap yang dipasang harus memenuhi syarat : ρ min ≤ ρ ≤ ρmax.
Nilai
Mn = 0,85.fc’.b.a(d-0,5a)+As’fy(d-d’)
Mn = 0,85.25.400.239,38(506-239,38x0,5)+2034,72.400(506-58)
1. Tumpuan
Vu,d= kN
Gaya geser terfaktor pada daerah lapangan (sejarak L/4 dari tumpuan)
Vu.L/4= kN
Kuat geser nominal Vc
Vu.L/4= kN
Kuat geser nominal Vc